PROPOSAL PREPARED FOR:
City of San Dimas
SAN DIMAS
CA
ATTACHMENT 1
SAN DIMAS
MONUMENT TOTAL $37,500.00
MONUMENT LOCATION
MONUMENT
QTY DESCRIPTION PRICE TOTAL
1 $37,500.00 $37,500.00
2026 WARRANTY AND TERMS
Warranty, Network Responsibility, Project Terms & Service Support Warranty (Two-Year Limited Workmanship Warranty)
Vox Audio Visual (“Vox AV”) provides atwo (2) year limited warranty from the date of system commissioning covering workmanship and system integration performed by Vox AV.
Workmanship & Integration Warranty (2 Years)
For a period of two (2) years from system commissioning, Vox AV warrants:
Installation workmanship
System integration and configuration
Termination, labeling, and routing of cabling installed by Vox AV Rack assembly, equipment mounting, and physical system build quality If a covered workmanship issue is identified during this period, Vox AV will repair or correct the issue at no cost to the client.
Equipment & Manufacturer Warranty (Up to Two Years Maximum) All equipment supplied by Vox AV is coveredexclusively by the original manufacturer’s warranty, subject to the manufacturer’s terms and conditions.
Manufacturer warranties are passed through to the client and honored to the extent provided by the manufacturer.
Warranty periods vary by manufacturer and product and typically range fromone (1) year up to two (2) years.
Under no circumstances will Vox AV warrant hardware for more than two (2) years, regardless of any longer manufacturer-stated warranty.
Extended Manufacturer Warranties
In cases where a manufacturer offers a warranty period longer than two (2) years, any coverage beyond the two-year period may be available Placemaking Monument
PREPARED FOR: City of San Dimas
SCOPE:
SOLE SOURCE:
The Route 66 Centennial Monument Project is a unique art project designed to provide a continuous connection between Route 66 communities along the historic corridor from Chicago, Illinois to Santa Monica, California. This artwork was designed by Vox Industries in collaboration with public artist Stan Carroll. Each art piece is custom fabricated by Vox Industries of Oklahoma City. No other artists or fabricators are authorized to produce or attempt to replicate the custom art piece. The art was formally endorsed by the Oklahoma Route 66 Centennial Commission as an official Centennial project on August 13, 2024. Procuring an official Route 66 Centennial Monument is considered a unique and sole-sourced endeavor.
The Route 66 Centennial
Monument Project
DATE:July 7, 2026
QUOTE NUMBER: P-1165
PROJECT NAME: CA-San Dimas-City of San Dimas-Route 66
Centennial Monument
directly through the manufacturer. Vox AV does not administer, extend, or provide support for manufacturer warranties beyond two (2) years, and any such coverage is subject to the manufacturer’s terms, processes, and approval.
Important Manufacturer Warranty Timing Notice
Manufacturer warranty periods typically begin at the time of shipment, delivery to the distributor, or receipt by Vox AV —notthe client’s installation or commissioning date. As a result, a portion of the manufacturer warranty period may elapse prior to installation if equipment is staged or stored before deployment.
Vox AV does not reset, extend, or supplement manufacturer warranty timelines.
Warranty Applicability for System Additions, Expansions, or Modifications For projects involving additions, expansions, upgrades, or modifications to an existing system:
This warranty appliesonly to the equipment, cabling, programming, configuration, networking, and workmanshipprovided under the current project scope.
Existing or retained equipment and infrastructure remain subject to theiroriginal warranties and installation terms, if any.
Vox AV does not extend, renew, or reinstate warranties on existing systems unless expressly stated in writing.
Vox AV is not responsible for failures, compatibility issues, or performance limitations arising from pre-existing equipment, infrastructure, or conditions outside the current scope of work. Any service required to diagnose or correct issues related to retained systems is not covered under warranty and will be billed at standard service rates.
Optional Service Agreement Support
Vox AV may offer aseparate Service Agreement providing expanded service response, preventative maintenance, and administrative assistance with manufacturer warranty claims.
Service Agreements are optional and governed by their own written terms.
Such agreements do not extend or increase manufacturer warranty coverage or duration.
Hardware-related support under any Service Agreement shallnot exceed the applicable manufacturer warranty period.
Service Agreements are not included unless expressly stated in writing.
Network Infrastructure & Responsibility
Vox AV may design, install, or configure network infrastructure in support of AV systems.
AV-Dedicated Networks
Networks installed and maintained by Vox AV are intendedsolely for AV system operation, control, monitoring, and communication.
These networks are not general-purpose IT networks, except where required for wireless AV control or communication.
Vox AV does not act as a managed service provider unless expressly stated in writing.
Vox AV warrants AV network configurationonly while Vox AV retains controlof the network equipment and configuration as delivered at commissioning.
Client-Managed, Third-Party, or External Networks
When AV systems rely on
Client-managed networks,
Third-party IT providers,
External systems or services, includinginternet connectivity, Vox AV is not responsible for AV system issues caused by outages, configuration changes, firmware updates, security policies, bandwidth limitations, or third-party services. Such issues are excluded from warranty coverage.
Network Access Requirements
Where required for system configuration, commissioning, monitoring, updates, licensing, or support, theclient is responsible for providing The Route 66 Centennial
Monument Project
DATE:July 7, 2026
QUOTE NUMBER: P-1165
PROJECT NAME: CA-San Dimas-City of San Dimas-Route 66
Centennial Monument
Vox AV with timely access to:
Internet connectivity, and/or
The client’s internal network infrastructure
Delays in providing required network or internet access may:
Delay system commissioning or completion
Prevent remote configuration or testing
Result in remobilization, return visits, or additional labor charges Any additional costs resulting from delayed or unavailable network access are not covered under warranty and will be billed at standard service rates.
Network-Related Service & Support
Network-related issues are covered under warranty only when Vox AV supplied, configured, and retains control of the network environment. Issues arising from third-party control, client-managed infrastructure, or external dependencies are billable at standard service rates.
Warranty Exclusions
This warranty does not cover damage or failures resulting from:
Acts of God (fire, flood, lightning, power surges, water intrusion, etc.) Vandalism, theft, or loss of equipment
Improper or unauthorized operation or configuration changes Firmware or software updates for systems not network-connected Modifications or repairs by parties other than Vox AV
Normal wear or cosmetic damage
Project Timeline, Installation Assumptions & Client Responsibilities Project Timeline & Scheduling
Engineering begins upon signed contract.
Procurement and staging begin only aftercleared receipt of payment.
Delays caused by payment issues, site access restrictions, approval delays, construction delays, or scope changes will result in corresponding schedule extensions.
Typical project timelines range from2–8 weeks, depending on scope and equipment availability.
Installation Scheduling Assumptions
Project labor and installation pricing are based on the assumption ofconsecutive installation days, scheduled and directed by Vox AV, to allow for efficient use of labor and resources.
If installation progress is interrupted due to:
Client-imposed scheduling limitations
Construction delays or incomplete site readiness
Restricted access, limited working hours, or stop-start conditions Delays caused by other trades or third parties under client control Vox AV reserves the right to billadditional labor, remobilization, and return-trip costs at standard service rates. Such costs are not covered under warranty.
Client Site Access & Installation Requirements
The client is responsible for providing Vox AV withsafe, timely, and reasonable access to the project site, including:
The Route 66 Centennial
Monument Project
DATE:July 7, 2026
QUOTE NUMBER: P-1165
PROJECT NAME: CA-San Dimas-City of San Dimas-Route 66
Centennial Monument
2026 WARRANTY AND TERMS $0.00
SALES TAX $0.00
TOTAL +$0.00
Clear access for Vox AV personnel and fleet vehicles
Designated loading zones, docks, or service entrances where available Access to freight or service elevators as required
Parking and unloading locations within a reasonable distance of building entry points If paid parking is required,parking must be validated or reimbursed. Unvalidated parking will be billed to the client at cost.
The client shall ensure:
Work areas are accessible, safe, and free of obstructions Required building permissions, badges, escorts, or security access are arranged in advance Power, HVAC, lighting, and network services are available and operational when required Delays or inefficiencies caused by inadequate access or site readiness may result in additional charges and schedule extensions.
Supply Chain & Pricing Terms
Proposal pricing is valid through the stated expiration date.
Pricing may be adjusted due to vendor cost changes, tariffs, or global trade conditions.
Vox AV is not responsible for delays caused by supply chain disruptions or governmental actions.
Service & Support
Phone Support
Complimentary during standard business hours (Monday–Friday) After-hours support subject to availability
Onsite Response
Standard response within48 business hours
Same-day response for urgent issues reported before 3:00 PM Central Time, subject to availability Service Rates
The following rates apply to services not covered under warranty or outside an active Service Agreement:
Remote Support:
$150/hour — 1 hour minimum
Onsite Service Calls:
$350/hour — 2 hour minimum
Operational Support & Programming:
$275/hour — 2 hour minimum
Travel time, lift rentals, parking, permits, after-hours work, or extraordinary access requirements may be billed separately unless otherwise stated in writing.
Final Notes
This document represents the standard terms governing Vox Audio Visual projects unless otherwise modified in writing. No implied warranties or obligations exist beyond those expressly stated herein.
The Route 66 Centennial
Monument Project
DATE:July 7, 2026
QUOTE NUMBER: P-1165
PROJECT NAME: CA-San Dimas-City of San Dimas-Route 66
Centennial Monument
LONGEVITY ESTIMATES AND WARRANTY
HOW IT’S CONSTRUCTED
The Route 66 Centennial Monument is designed to last decades. Made of routed acrylic, inlaid steel and aluminum, each unit is carefully handcrafted to stand the test of time. Each metal piece is coated with a reflective UV-resistant automotive paint, pinned, riveted, and bolted to mating parts. The aesthetic facia and supporting lighting enclosure is attached to a steel superstructure. The interior is illuminated with long-lasting commercial-grade LED illumination. The monument is set into a concrete pier for support.
The entire monument is designed to withstand the impact of sustained winds up to 120 mph.
PROJECTED WEAR
As with any manmade object that is completely exposed to the outdoor elements, there will be some degradation over time. Paint is estimated to last without the beginning of fade for eight years and LED illumination may require occasional replacement of power supplies depending on the quality of power over time. The entire unit is estimated to last for 30-years before it is recommended to remove the monument for disassembly for shop-level refurbishment. A threaded eyelet connection at the very top of the monument allows the illumination chamber to be easily removed from the supporting mast for quick and easy maintenance or warranty repairs.
The illumination chamber is designed to be easily access the lighting equipment should any onsite lighting maintenance be required.
WARRANTY
The Route 66 Centennial Monument is warrantied for 5-years for any structural or mechanical failures resulting from a failure of workmanship during the fabrication or installation process. We believe this is an adequate period of time in which any substandard issues accidentally occurring can be resolved and meaningfully remedied without escalating the costs for each monument.
The 5-year warranty begins on the date of the completion of erecting the monument. Any issue arising from a product failure should be reported immediately to the Route 66 Centennial Monument Project Office.
EXCLUSIONS
Vox Industries LLC does not cover Route 66 Centennial Monument lighting failure as the result of power surges, dirty power, lightning damage, or other acts beyond the control of Vox Industries LLC. Vandalism, theft, vehicular impact, intentional harm, unintentional physical harm, and other degradation caused to the monument is not covered under warranty. Damaged caused by wind blown debris at any mph is not covered under warranty. Wind damage caused by winds or air turbulence sustained or unsustained above 120mph is not covered under warranty. The Route 66 Centennial Monument is not warrantied for lighting damage caused by direct or indirect contact with lightning. The Route 66 Centennial Monument is not warranted for flood or severe water damage resulting from the immersion of the lighting chamber. The Route 66 Centennial Monument is not warrantied for damage caused by earthquakes and earthen seismic ground shifts including but not limited to such event causing the unit to permanently tilt or collapse. The Route 66 Centennial Monument is not warrantied for damage caused by the improper connection to electricity by others for illumination. Vox Industries LLC does not cover issues related to the installation of the Route 66 Monument if the installation is performed by contractors or others not directly engaged by Vox Industries LLC.
Upon receiving notice of a warranty issue, The Route 66 Centennial Monument Project Office Staff shall vet the severity of the reported issue, determine if it poses a safety issue to the public, make recommendations to the customer, and initiate a warranty solution according to their judgement as to the best resolution.
RECOMMENDATIONS
The Route 66 Centennial Monument Project and Vox Industries LLC recommend that the monument be connected to the electricity by a licensed electrician and that all local, state, and federal rules, mandates, and building codes be followed according to the law.
Electrical connections are recommended to be connected to a GFCI (Ground Fault Circuit Interrupter) to protect against electrical shock in the event of a device or wiring failure.
The Route 66 Centennial
Monument Project
DATE: July 7, 2026
DESCRIPTION: CA-San Dimas-City of San Dimas-Route
66 Centennial Monument
QUOTE NUMBER: P-1165
PAYMENT SCHEDULE
50% Equipment Fees Deposit Due upon Signing
Ensures product is ordered to avoid price
changes due to market volatility
Product must arrive in full and be received
before installation will be scheduled
Product will be warehoused and staged until
installation begins
50% Labor Fees Due upon physical installation
completion
Any Change Orders approved after contract signing
will be billed at 100% of all equipment, labor, and
programming upon signing.
EQUIPMENT TOTAL $37,500.00
SHIPPING TOTAL $0.00
ENGINEERING $0.00
INSTALLATION $0.00
MANAGEMENT $0.00
PROGRAMMING $0.00
LABOR TOTAL $0.00
SUBTOTAL $37,500.00
TOTAL SALES TAX $0.00
PROJECT TOTAL $37,500.00
SIGNED DATE
PRINT NAME TITLE
SIGNED DATE
PRINT NAME TITLE
ACCEPTANCE
FINANCIAL
TERMS
I accept this proposal and hereby authorize The Route 66 Centennial Monument Project to proceed with the installation of the included systems at the facilities of City of San Dimas constructing at 245 East Bonita Avenue SAN DIMAS, CA 91773 as described in the totality of this document. I further authorize The Route 66 Centennial Monument Project to be granted the facility access that will be required to complete this project in a workmanlike and timely manner and for payment to be made to The Route 66 Centennial Monument Project. In keeping with the Terms of Payment listed above: It has been made clear to me that there exist no understandings regarding this project with any relevant party unless and until City of San Dimas and The Route 66 Centennial Monument Project agree to such additional or alternate understandings in writing. Project cost and pricing are dependent upon a continual flow of work without interruption or delays imposed by City of San Dimas or their staff, construction, other building trades or any other party, and additional costs may be incurred by City of San Dimas from The Route 66 Centennial Monument Project. If such delays result in additional costs that are not covered by the pricing in this proposal: I agree that any additions to and/or deletions from the materials and labor to be provided by my acceptance of this proposal and any resulting change(s) in cost of this project shall only be by way of written change order(s) and shall be valid only after being signed by City of San Dimas and The Route 66 Centennial Monument Project.
ACCEPTANCE
CITY OF SAN DIMAS
THE ROUTE 66 CENTENNIAL MONUMENT PROJECT
The Route 66 Centennial
Monument Project
DATE: July 7, 2026
DESCRIPTION: CA-San Dimas-City of San Dimas-Route
66 Centennial Monument
QUOTE NUMBER: P-1165