ATTACHMENT 6
Response to November 9, 2026
Public Notice Comment Letter
This document summarizes responses to the comment letter dated October 24, 2026 in relation to the Lone Hill Park Regional Watershed Management Program Project (Project) in advance of the November 9, 2026 scheduled public hearing. The subsections below follow the format of the comment letter.
1. Proposed Additional Parking Lot and Loss of Existing Green Space
A new parking lot is proposed off Juanita Avenue just east of Shellman Avenue to support softball programming. The parking lot will help reduce street parking demand. The inclusion and details of the parking lot do not significantly impact the findings included in the Mitigated Negative Declaration (MND).
1. The design plans include details on the parking lot layout. This level of detail is not required for the environmental document. The parking lot includes 20 spaces, of which, two (2) support Electric Vehicle (EV) charging and one (1) is Americans with Disabilities Act (ADA) accessible.
2. The parking lot is approximately 9,500 square feet. Existing turf area will be replaced with the parking lot, which includes pervious pavement parking stalls.
3. Specific studies were not required to support the design. During softball programming, cars can be observed parking on the adjacent neighborhood streets.
4. This is not applicable or required to support the inclusion of the parking lot.
5. The parking lot is not related to the stormwater management functions. The stormwater capture features are located on the north side of the park. The parking lot is included to help address other park needs (parking to support programming).
6. Parking lot maintenance is considered minimal. The pervious pavement will be inspected and cleaned annually. City includes municipal parking lots in the bi-weekly street sweeping schedule.
2. Environmental Review, Wildlife Habitat, and Preservation of Mature Trees
1. Field surveys evaluating biological resources and nesting habitats will be performed prior to construction activities. The MND highlights potential findings based on available resources.
Site specific studies will be available prior to construction. It is common for biological resource assessments to be performed prior to construction, such that the most relevant information can be collected prior to disturbance, especially in more developed areas.
2. The design plans include details on tree removal, protection, and new trees. This level of detail is not required for the environmental document.
3. Mitigation Measure BIO-2 identifies requirements for nesting bird surveys, which will be performed prior to construction activities within the nesting bird season. The qualified biologist will make recommendations or define set back requirements if nesting birds are observed.
4. The City is responsible for implementing mitigation measures in accordance with the MND and Mitigated Monitoring and Reporting Program (MMRP).
5. In accordance with the biological resource mitigation measures, a habitat assessment will be performed prior to Project construction.
6. The Project footprint covers the area required for the amenities included. Trees were avoided when possible and new trees will be planted as part of the Project. New native/low water use planting is included in the design, which will support native bees, butterflies, and other habitats.
3. Project Budget, Financial Accountability, and Evaluation of Alternatives
Construction funding has not been secured at this point. The City received funding from the Safe, Clean Water Program (SCWP) to support the Project design. That funding program, along with other potential future funding programs, prioritize multi-benefit projects that combine features like stormwater management with other community benefits, such as park enhancements.
1. The estimated construction budget is approximately $15 million, while the actual cost will depend on when construction moves forward, funding availability, and other economic conditions at the time of construction. The City received $900,000 from SCWP to support the design of the Project.
2. An itemized cost opinion will be included as part of the final design package and is not relevant to the environmental document.
3. The City has secured $900,000 for the Project design from the SCWP Regional Infrastructure funding program. Construction funding has not been secured at this time.
4. As noted above, the City has not secured construction funding at this time. Depending on the funds secured, certain improvements may or may not be eliminated. This will depend on the final funding agreements between the City and partnering/funding agencies.
5. Operation, maintenance, inspection, and replacement costs will depend on the final constructed conditions, weather patterns, and other details that are not available at the time of environmental document adoption. Typically, annual operation and maintenance costs for similar projects is around $150,000 per year.
6. As noted above, the parking lot helps meet park programming needs. Alternatives are not being assessed.
4. Existing Park Maintenance and Operational Concerns
1. The City regularly maintains Lone Hill Park, including trash collection and litter removal. Staff will evaluate whether adjustments to maintenance schedules are warranted during periods of increased recreational activity.
2. The City will evaluate the need for additional trash receptacles and cleanup requirements for organized athletic activities to help maintain park cleanliness.
3. Alcohol consumption is subject to applicable City park regulations. Concerns regarding violations may be reported to the Los Angeles County Sheriff's Department for appropriate enforcement
4. Overnight parking and camping are subject to applicable City regulations, with enforcement coordinated through the Sheriff's Department and appropriate outreach services as needed.
The proposed design includes a sidewalk extending around the perimeter of the park that will accommodate Sheriff's deputies driving through the park to conduct patrols and address security concerns.
5. As noted above, parking lot maintenance is considered minimal. The pervious pavement will be inspected and cleaned annually. It is not anticipated that the new parking lot will significantly increase maintenance or overnight management challenges.
6. As noted above, additional staffing, maintenance, and enforcement is not anticipated because of the new parking lot. The stormwater management system will require maintenance (additional details above), while it does not directly require additional staffing or enforcement.
5. Community Input and Neighborhood Recreational Priorities The City can provide the latest conceptual design plans for review. The City held three initial public outreach events to gather community feedback on preferred recreational amenities and a theme for the new playground, reaching approximately 400 residents. Pickleball courts and a full-size basketball court were identified as the top priorities and are included in the conceptual design. A dog park ranked third; however, given the park’s existing recreational uses, available space, and proposed improvements, it was determined that a designated dog park would not be appropriate for this location. The proposed amenities were subsequently reviewed by the Parks & Recreation Commission.
The conceptual design is not final, and the specific improvements will depend on the availability and amount of construction funding secured. Should construction funding be obtained, the plans will be refined based on available funding, and the City will conduct an additional public outreach event at Lone Hill Park to provide residents an opportunity to review the updated design and provide feedback. The event will be scheduled during a period of high park usage to maximize participation. Residents surrounding the park will again be notified by mail, and the event will be advertised through the City's social media channels.
Community feedback will be presented to the Parks & Recreation Commission for review and recommendations. The final design, incorporating community input and Commission feedback, will then be presented to the City Council for consideration and final approval.
6. Construction Impacts and Protection of Surrounding Residents
1. A detailed construction schedule will be developed once the City has secured construction funding and a contractor is selected. The timeline and sequencing of the Project will depend on the funding received (elements funded) and construction start date. The Project specifications require work in front of Gladstone Elementary School on Shellman Avenue during the summer months when school is not in session.
2. Proposed construction vehicle routes, equipment staging locations, and traffic control measures will be detailed by the contractor once selected and will be in accordance with local ordinances and Project specifications.
3. Pedestrian and school access must be maintained during construction. Work will be coordinated with the elementary school and school district once funding is secured.
4. The City team will work with the selected contractor to monitor construction noise, dust, and vibration. Specific monitoring requirements will be included in the Project specifications in alignment with the MND and associated mitigation measures. On similar projects, monitoring devices have been installed and monitored by the City team.
5. The MND includes mitigation measures that help reduce impacts on nearby residential properties, trees, and habitat. For some specific examples, refer to Sections 3.3 (Air Quality),
3.4 (Biological Resources), and 3.13 (Noise).
6. The City representative for construction-related complaints and mitigation compliance will be determined and shared once the construction phase receives funding and the construction schedule is confirmed.
7. Requests Regarding the Initial Study/Mitigated Negative Declaration
Refer to responses on most of these comments in the sections above. Unfortunately, the public comment period has closed. Most of the comments are related to Project design and do not present evidence of a significant environmental impact that the MND did not address.