Eff. semi-annual Apr & Oct Annually in October Effluent semi annual April & October 293
Section C
Collection System Report
294

PROJECT STATUS REPORT & PROJECTIONS
Project Name: City of Adelanto
Department: Collection System
Month: October 2023
Prepared By: PERC Water Corporation

PROJECT STATUS REPORT
Date Footage Mo/Yr Area Locations That Need Attention
October
2023
9815 / 25817 • Pearmain &
Jonathan
area N & S of
Victor
• Monthly enhanced maintenance
areas
• Quarterly enhanced maintenance
areas
TABLE OF CONTENTS:
01) Adelanto Enhanced Maintenance Annual Log 2023
02) Adelanto Enhanced Maintenance 10-23
03) Adelanto Sewer Cleaning 10-23
04) Adelanto Emergency callout 10-31-23
LIST OF NOTES:
01) On 10-10-23 PERC staff received notification of a sewer back up located at 19027 Dennis St. Upon investigation and talking with home owners PERC staff advised the home owner to have the lateral professionally cleaned as they were the only property on the sewer line having an issue. PERC staff could not inspect upstream and down stream manholes as there are not manholes on this sewer line. It is PERC’s recommendation that the city invest in a rehabilitation project for the sewer lines in this area by having manholes installed instead of the currant clean-outs. By doing so the sewer lines can be properly cleaned and maintained.
02) On 10-13-23 PERC staff cleaned the lift station wet well with the Vactor. 03) On 10-22-23 PERC staff received notification of a sewer back up located at 11211 La Habra Ave.

Upon inspection PERC staff found sewage coming out of the clean out but up and down stream manholes flowing properly. The caller was advised to get in touch with the property management to have the lateral professionally cleaned.
04) On 10-24-23 PERC staff received a sewer complaint for 11745 Brockman. PERC inspected and cleaned the city sewer.
05) On 10-25-23 PERC staff performed a dye test for 11745 Brockman, and confirmed address is on city sewer.
295
6) On 10-27-23 PERC staff performed another cleaning of the Brockman line and dye tested again 11747 Brockman also confirming connection to city sewer. 7) On 10-31-23 PERC staff responded to a notification of a sewer back up located at Muskrat and Joshua. PERC staff found a blockage located approximately 150 feet west of Raccoon and Air Expressway. The blockage was cleared and the sewer line was fully cleaned the following day during business hours.
296
MONTHLY Map pg. JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Date Date Date Date Date Date Date Date Date Date Date Date Bellflower & Auburn 460 N 500 W 4-Jan 13-Feb 14-Mar 3-Apr 8-May 21-Jun 6-Jul 1-Aug 19-Sep 16-Oct 1st Mh W 395 & Auburn 400 W 4-Jan 13-Feb 14-Mar 3-Apr 8-May 21-Jun 6-Jul 1-Aug 19-Sep 16-Oct 1st Mh E 395 & Auburn 500 W 4-Jan 13-Feb 14-Mar 3-Apr 8-May 21-Jun 6-Jul 1-Aug 19-Sep 16-Oct Pearmain & Taylor 275 S & 285 W 8 4-Jan 13-Feb 14-Mar 3-Apr 8-May 19-Jun 6-Jul 1-Aug 19-Sep 16-Oct Pearmain & Cactus 300 E & 400 S 10 4-Jan 13-Feb 14-Mar 3-Apr 8-May 19-Jun 6-Jul 1-Aug 19-Sep 16-Oct 1st Mh W Aster & Vintage 500 W 41 4-Jan 13-Feb 14-Mar 3-Apr 8-May 19-Jun 6-Jul 1-Aug 19-Sep 16-Oct Aster & Vintage 500 W 41 4-Jan 13-Feb 14-Mar 3-Apr 8-May 21-Jun 6-Jul 1-Aug 19-Sep 16-Oct

BI-MONTHLY JAN MAR MAY JUL SEP NOV

QUARTERLY JAN APR JUL OCT
Verbena & Mojave W 500 W & S 23 4-Jan 3-Apr 6-Jul 16-Oct 1st mh N Forest & Muskrat 500 N&S 4-Jan 3-Apr 6-Jul 16-Oct Joshua & Verbena 200 W 17 4-Jan 3-Apr 6-Jul 16-Oct
Cactus & Caliente 400 W 8.9 4-Jan 3-Apr 6-Jul 16-Oct
Bartlett & Lilac 4-Jan 3-Apr 6-Jul 16-Oct

BI-ANNUAL JAN JUL
Geo East
297
City of Adelanto Enhanced Maintenance Collection System Operator: Shawn Month: October 2023 Date Location Street & Cross Street Feet
Cleaned
Comments
1 10/16/2023 Pearmain & Taylor 275 Cleaned south grease 2 10/16/2023 Pearmain & Taylor 285 Cleaned west
3 10/16/2023 Pearmain & Cactus 400 Cleaned south
4 10/16/2023 Pearmain & Cactus 300 Cleaned east
5 10/16/2023 Cactus & Caliente 400 Cleaned west
6 10/16/2023 Verbena & Mojave 500 Cleaned south, grease in MH channel 7 10/16/2023 Verbena & Mojave 500 Cleaned west, grease in MH channel 8 10/16/2023 Verbena & Joshua 200 Cleaned west, grease in MH channel 9 10/16/2023 Bartlett & Lilac 700 Cleaned west
10 10/16/2023 1st Mh N Muskrat & Forest 500 Cleaned north 11 10/16/2023 1st Mh N Muskrat & Forest 500 Cleaned south 12 10/16/2023 Vintage 500 Cleaned west
13 10/16/2023 Aster & Vintage 500 Cleaned west
14 10/16/2023 Bellflower & Auburn 460 Cleaned north grease 15 10/16/2023 Bellflower & Auburn 500 Cleaned west grease 16 10/16/2023 1st Mh W Auburn & 395 400 Cleaned west
17 10/16/2023 1st Mh E Auburn & 395 500 cleaned west
18 19
20 21
22 23
24 ^
Total Feet 7,420
298
City of Adelanto Collection System Log Operator: Shawn Month: October 2023 Date Location Street & Cross Street Feet
Cleaned
Comments
1 10/18/2023 Jonathan & Villa 390 Cleaned east
2 10/18/2023 Jonathan & Villa 325 Cleaned west
3 10/18/2023 Jonathan & Villa 453 Cleaned south
4 10/18/2023 Jonathan & Villa 407 Cleaned north (back jet) 5 10/18/2023 Daniella & Jonathan 194 Cleaned west
6 10/18/2023 Daniella & Jonathan 453 Cleaned south
7 10/18/2023 Jonathan & Victor 475 Cleaned west
8 10/18/2023 Jonathan & Victor 407 Cleaned south
9 10/24/2023 Jonathan & Brockman 316 Cleaned east (for dye test & sewer backup 10 10/24/2023 Jonathan & Brockman 316 Cleaned east (for dye test & sewer backup 11 10/24/2023 Nehmans & Davis 340 Cleaned west
12 10/24/2023 Nehmans 238 Cleaned west
13 10/24/2023 Dragon Tree 299 Cleaned west
14 10/24/2023 Dragon Tree 115 Cleaned south
15 10/24/2023 Dragon Tree 318 Cleaned south
16 10/24/2023 Dragon Tree & Jenny 229 Cleaned south
17 10/24/2023 Dragon Tree & Jenny 316 Cleaned north
18 10/24/2023 Wallflower 320 Cleaned west
19 10/24/2023 Wallflower & La Paz 554 Cleaned west
20 10/24/2023 Wallflower & La Paz 521 Cleaned east
21 10/25/2023 Benjamin & Cliffrose 118 Cleaned south
22 10/25/2023 Cliffrose 444 Cleaned west
23 10/25/2023 Cliffrose & Pearmain 663 Cleaned west
24 10/25/2023 Cliffrose & Pearmain 507 Cleaned east
25 10/25/2023 Cliffrose & Pearmain 343 Cleaned south
26 10/25/2023 Pearmain & Victor 505 Cleaned south
27 10/25/2023 Pearmain & Jenny 292 Cleaned west
28 10/25/2023 Pearmain & Jenny 672 Cleaned south
Total Feet 9,815
299
City of Adelanto Collection System Emergency Callout Operator: Shawn Date: 10-31-23 Time Location Street & Cross Street Feet
Cleaned
Comments
1 Racoon & Air Expressway 700
PERC staff cleaned the line 2 times. Blockage consisted of some grease but mostly septic sludge approximately 150 ft west of the intersection of Raccoon & Air Expressway. Vactored up and hosed down small puddle outside northwest gate of the 420 complex located near Muskrat and Joshua. Muskrat and Joshua was the location given to PERC staff by the city.
2 Racoon & Air Expressway 700
3 4
5 6
7 8
9 10
11 12
13 ^
Total Feet 1,400
300
Section D
Bio-Solids Report
301
October 2023 Section D – Bio-solids Report
Adelanto Wastewater Treatment System
Bio-solids Report
In October 2023, PERC Water Staff performed dewatering procedures to dewater 1,961,517 gallons of bio-solids from the aerated solids holding tank. See data table below for amounts and disposal costs. Wet tons of bio-solids were removed at an average total solids concentration of 22%. End dump trailers were collected periodically by GIC Corporation and delivered to Synagro composting facility in Helendale, CA.

Wet Tons Dry Tons Wet Tons Dry Tons
January 321.00 73.83 13 13 $5,119.95 $9,873.96 $14,993.91 $46.71 February 298.26 68.60 12 12 $4,757.25 $9,174.48 $13,931.72 $46.71 March 348.53 80.16 967.79 222.59 14 14 $5,559.05 $10,720.78 $16,279.84 $46.71 April 270.79 51.45 11 11 $4,319.10 $8,329.50 $12,648.60 $46.71 May 263.76 50.11 11 11 $4,206.97 $8,113.26 $12,320.23 $46.71 June 227.52 43.23 762.07 144.79 9 9 $3,628.94 $6,998.52 $10,627.46 $46.71 July 226.46 43.03 9 9 $3,612.04 $6,965.91 $10,577.95 $46.71 August 276.01 55.20 11 11 $4,402.36 $8,490.07 $12,892.43 $46.71 September 173.89 34.78 676.36 133.01 7 7 $2,773.55 $5,348.86 $8,122.40 $46.71 October 240.43 52.89 10 10 $3,834.86 $7,395.63 $11,230.49 $46.71 November 0.00 $0.00 $0.00 $0.00 #DIV/0!
December 0.00 240.43 52.89 $0.00 $0.00 $0.00 #DIV/0!
Total Tons 2646.65 553.29 2646.65 553.29 107 107 $42,214.07 $81,410.95 $123,625.02 #DIV/0! Metric Tons 2400.51 501.83 2400.51 501.83 total total total total total average 2023 BIO-SOLIDS HAULED
Adelanto production Quarter # of GIC
end dump
Removed
# Synagro
loads
received
Total Hauling
Cost
Total Tipping
Fee Cost Total Cost Total Cost Per Ton
302
October 2023 Section D – Bio-solids Report
Adelanto Wastewater Treatment System
Burrtec hauls off screenings/rags and recycle product from the facility each month. See data table below for bins removed from the Facility.

RECYCLE
# of Bins ft3
yards # of Bins
January 20 40 2
February 23 46 2
March 22 44 2
April 20 40 1
May 23 46 2
June 22 44 2
July 20 40 2
August 23 46 1
September 22 44 2
October 23 46 2
November 0
December 0
Total 218 436 18
2023 SCREENINGS/GRIT HAULED
303
Section E
Preventive Maintenance
CMMS Report
304
October 2023 Section E Completed Work Orders
Adelanto Wastewater Treatment System
Completed Work Orders
Below is a list of the Adelanto’s Wastewater System’s completed work orders for the month of October: 84 tasks completed
Completed
Date
Asset ID Asset Description Brief Description
10/1/2023 AWWTP eye wash eye wash/shower weekly check
10/1/2023 Headworks Influent Pump 1 Rotate settings with Bypass pump
10/1/2023 PONDS Percolation Ponds Rotate ponds
10/1/2023 Sampling SAMPLING Bio solids sampling
10/1/2023 Secondary RAS pumps Swap RAS pumps
10/2/2023 Headworks Grit Pump 1 Motor Lubrication & Grease 10/2/2023 Headworks Grit Pump 2 Motor Lubrication & Grease 10/2/2023 Headworks Pump station Wet well grease cleaning 10/2/2023 Headworks Pump station air release debris removal 10/2/2023 Headworks Pump station lift station float alarm 10/2/2023 Headworks Pump station Run backup generator for monthly test
10/2/2023 Solids Handling Andritz Centrifuge Run Andritz centrifuge 10/2/2023 Solids Handling Centrisys Muffin
Monster
Centrisys Muffin Monster
lubrication grease
10/3/2023 Secondary Pipe Plug (pig) Check plug
10/3/2023 Secondary North Clarifier Weekly Clarifier check 10/3/2023 Secondary South Clarifier Weekly Clarifier check 10/3/2023 Solids Handling Polymer unit Clean polymer flow sensor 10/3/2023 Solids Handling Centrisys Centrifuge Lubricate Housing Seal Assembly 10/3/2023 Solids Handling Centrisys Centrifuge Lubricate Solids and Liquid end Headwall External Assembly
10/4/2023 AWWTP SCADA system Scada Test
10/4/2023 AWWTP Reports Collections, IPP, Emaint
10/4/2023 Solids Handling Sludge Thickener
West
Sludge thickener check
10/4/2023 Solids Handling Sludge Thickener
East
Sludge thickener check
10/5/2023 AWWTP Haz waste check
sheet
Check and fill out weekly check
sheet
10/5/2023 Headworks Probe Calibrate pH and EC probes
10/6/2023 AWWTP Haz waste check
sheet
Check AGST binder and make
sure it is up to date
305
October 2023 Section E Completed Work Orders
Adelanto Wastewater Treatment System
10/6/2023 Basins D O probes on North
and South Basins
Clean D.O. Probes on North and
South Basin
10/6/2023 collections Collection Systems Manhole inspection 10/6/2023 Secondary Recycle pump 1 for
new plant water
system
Bump motor for Recycle pump
10/6/2023 Secondary Recycle pump 2 for
new plant water
system
Bump motor for Recycle pump
10/7/2023 Blower Building BUILDINGS Replacement of Blower Building Filters
10/7/2023 collections Collection Systems Bellflower and Auburn 10/7/2023 collections Collection Systems Pearmain and Taylor 10/7/2023 collections Collection Systems Pearmain and Cactus 10/7/2023 collections Collection Systems Aster and Vintage 10/7/2023 collections Collection Systems Verbena & Mojave 10/7/2023 collections Collection Systems Forest and Muskrat 10/7/2023 collections Collection Systems Joshua & Verbena 10/7/2023 Headworks Grit Collector CPT 1 Monthly CPT inspection 10/7/2023 Headworks Grit Collector CPT 2 Monthly CPT inspection 10/8/2023 AWWTP First aid kits Monthly first aid kits check 10/9/2023 Headworks Grit Pump 1 grit pump belt check
10/9/2023 Headworks Grit Pump 2 grit pump belt check
10/9/2023 Solids Handling Andritz Centrifuge Run Andritz centrifuge 10/10/2023 Blower Building Aerzen Blower 1 Change and wash pre-filters 10/10/2023 Blower Building Aerzen Blower 2 Change and wash pre-filters 10/10/2023 Blower Building Aerzen Blower 3 Change and wash pre-filters 10/10/2023 Secondary Pipe Plug (pig) Check plug
10/10/2023 Secondary North Clarifier Weekly Clarifier check 10/10/2023 Secondary South Clarifier Weekly Clarifier check 10/10/2023 Solids Handling Polymer unit Clean polymer flow sensor 10/10/2023 Solids Handling Sludge Thickener
West
Scum Pit
10/10/2023 Solids Handling Sludge Thickener
East
Scum Pit
10/10/2023 Solids Handling Centrisys Centrifuge Lubricate Housing Seal Assembly 10/10/2023 Solids Handling Centrisys Centrifuge Lubricate Solids and Liquid end Headwall External Assembly
10/11/2023 AWWTP SCADA system Scada Test
10/11/2023 Solids Handling Sludge Thickener
West
Sludge thickener check
10/11/2023 Solids Handling Sludge Thickener
East
Sludge thickener check
306
October 2023 Section E Completed Work Orders
Adelanto Wastewater Treatment System
10/12/2023 AWWTP Haz waste check
sheet
Check and fill out weekly check
sheet
10/12/2023 Headworks Flex Rake East Flexrake check
10/13/2023 AWWTP Haz waste check
sheet
Check AGST binder and make
sure it is up to date
10/13/2023 Basins D O probes on North
and South Basins
Clean D.O. Probes on North and
South Basin
10/13/2023 Secondary Recycle pump 1 for
new plant water
system
Bump motor for Recycle pump
10/13/2023 Secondary Recycle pump 2 for
new plant water
system
Bump motor for Recycle pump
10/14/2023 collections 8 Inch portable pump Run 8 in portable pump 10/14/2023 Secondary North Clarifier change oil filter on clarifier 10/14/2023 Secondary North Clarifier Kusters Water clarifier oil change 10/14/2023 Secondary South Clarifier change oil filter on clarifier 10/14/2023 Secondary South Clarifier Kusters Water clarifier oil change 10/14/2023 Solids Handling Polymer Motor polymer pump gear box oil check 10/14/2023 Solids Handling Andritz Centrifuge Lubricate support bearing and motors
10/16/2023 Headworks Pump station lift station float alarm 10/16/2023 Solids Handling Andritz Centrifuge Run Andritz centrifuge 10/17/2023 AWWTP Tractor Check oil in tractor
10/17/2023 collections Multi gas detector Multi Gas Detector Calibration 10/17/2023 Secondary Pipe Plug (pig) Check plug
10/17/2023 Secondary North Clarifier Weekly Clarifier check 10/17/2023 Secondary South Clarifier Weekly Clarifier check 10/17/2023 Solids Handling Polymer unit Clean polymer flow sensor 10/17/2023 Solids Handling Centrisys Centrifuge Lubricate Housing Seal Assembly 10/17/2023 Solids Handling Centrisys Centrifuge Lubricate Solids and Liquid end Headwall External Assembly
10/27/2023 Basins D O probes on North
and South Basins
Clean D.O. Probes on North and
South Basin
10/27/2023 Secondary Recycle pump 1 for
new plant water
system
Bump motor for Recycle pump
10/27/2023 Secondary Recycle pump 2 for
new plant water
system
Bump motor for Recycle pump
307
Section F
SSMP/IPP Report
308
October 2023 Section F – IPP / SSMP Report
Adelanto Wastewater Treatment System

INDUSTRIAL PRETREATMENT PROGRAM (IPP) & SEWER SYSTEM MANAGEMENT

PLAN (SSMP)
Staff is reviewing all users and scheduling inspections for November 2023. Listed are October’s 2023 activities:
· Receiving flow and pH data from MK Magnetics periodically with their discharge to city sewer.
· Reviewed and commented on Project Referrals, Camino, and IPP applications. 309
Section G
Laboratory Results
310
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 1 of 12
Project Name:
25-Oct-2023 Work Order Number: C3J0719
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J0719
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.

Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.

Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C3J0719-01 Liquid 10/4/23 6:25 Tristan Hause Courier
(Guillermo)-DE
Influent ---ROUTINE--- 10/04/23 13:14
C3J0719-02 Liquid 10/4/23 6:05 Tristan Hause Courier
(Guillermo)-DE
Effluent ---ROUTINE--- 10/04/23 13:14
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
311
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 2 of 12
Project Name:
25-Oct-2023 Work Order Number: C3J0719
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J0719
Laboratory Reference Number
Sample Description
10/04/23 06:25
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Influent Liquid
C3J0719-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Dissolved Solids 540 10 10 mg/L SM 2540C 10/05/23 23:05 CMR Total Suspended Solids 210 10 10 mg/L SM 2540D 10/06/23 16:10 JXM Aggregate Organic Compounds
Biochemical Oxygen Demand 220 50 50 mg/L SM 5210B 10/04/23 23:43 DFL N-BOD1 Nutrients
Ammonia-Nitrogen 37 5.1 4.5 mg/L SM 4500NH3 G 10/11/23 11:15 GMB mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
312
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 3 of 12
Project Name:
25-Oct-2023 Work Order Number: C3J0719
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J0719
Laboratory Reference Number
Sample Description
10/04/23 06:05
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Effluent Liquid
C3J0719-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.70 0.20 0.12 mg/L EPA 300.0 10/05/23 05:40 ANM Nitrite as N ND 0.1 0.09 mg/L EPA 300.0 10/05/23 05:40 ANM Solids
Total Dissolved Solids 490 10 10 mg/L SM 2540C 10/05/23 23:05 CMR Total Suspended Solids 2 0.5 0.5 mg/L SM 2540D 10/06/23 16:10 JXM Aggregate Organic Compounds
Biochemical Oxygen Demand ND 5.0 5.0 mg/L SM 5210B 10/05/23 14:02 EZM N-BOD1 Total Petroleum Hydrocarbons ND 1.0 0.47 mg/L EPA 418.1 10/10/23 13:32 MBS Surfactants
MBAS 0.06 0.08 0.05 mg/L SM 5540C 10/04/23 21:39 BXR J
Nutrients
Ammonia-Nitrogen 0.3 0.1 0.09 mg/L SM 4500NH3 G 10/11/23 12:01 GMB Kjeldahl Nitrogen 0.9 0.1 0.1 mg/L EPA 351.2 10/22/23 13:44 VMV Total Nitrogen 1.6 0.40 mg/L Calculation
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
313
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 11 of 12
Project Name:
25-Oct-2023 Work Order Number: C3J0719
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J0719
Notes and Definitions
J Estimated value
N-BOD1 Dilution water blank exceeds 0.20 mg/L. As per method, data is reportable as qualified.

QFpas Follow-up result within laboratory acceptance criteria.

QMoRo MSD recovery and the MS/MSD RPD value did not meet laboratory acceptance criteria.

QRPDo The RPD value for the sample duplicate or MS/MSD did not meet laboratory acceptance criteria.

NR: Not Reported
ND: Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL: Reportable Detection Limit
MDL: Method Detection Limit
* / (Non-NELAP): NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.

Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.

Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.

Approval
cc:

Alexis Nicole Harold For Cindy A. Waddell
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
314
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 12 of 12
Project Name:
25-Oct-2023 Work Order Number: C3J0719
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J0719
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
315
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 1 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.

Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.

Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C3J0788-01 Effluent ---ROUTINE--- Liquid 10/4/23 6:05 Tristan Hause 10/04/23 13:14 Tristan Hause Note: Requested Hexavalent Chromium analysis was subcontracted to McCampbell Analytical, Inc. mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
316
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 2 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
Laboratory Reference Number
Sample Description
10/04/23 06:05
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Effluent Liquid
C3J0788-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Cations
Sodium 96 1.0 0.66 mg/L EPA 200.7 10/13/23 22:45 YVD
Anions
Chloride 93 1.0 0.30 mg/L EPA 300.0 10/05/23 19:20 EZM
Sulfate 100 0.50 0.36 mg/L EPA 300.0 10/05/23 19:20 EZM Fluoride 0.7 0.1 0.04 mg/L SM 4500F C 10/06/23 09:11 GMB Aggregate Organic Compounds
Phenols ND 0.020 0.013 mg/L EPA 420.4 10/10/23 10:48 ANM General Inorganics
Total Cyanide ND 0.0050 0.0043 mg/L SM 4500CN E 10/13/23 20:17 MCM Sulfide ND 0.10 0.10 mg/L SM 4500S2 D 10/06/23 20:06 CMR Metals and Metalloids
Antimony ND 0.010 0.0020 mg/L EPA 200.8 10/06/23 13:22 AJH Arsenic 0.0041 0.0050 0.0018 mg/L EPA 200.8 10/06/23 13:22 AJH J Beryllium ND 0.010 0.00033 mg/L EPA 200.8 10/06/23 13:22 AJH Boron 0.38 0.10 0.033 mg/L EPA 200.7 10/13/23 22:45 YVD Cadmium ND 0.0010 0.00025 mg/L EPA 200.8 10/06/23 13:22 AJH Total Chromium ND 0.020 0.0040 mg/L EPA 200.8 10/06/23 13:22 AJH Copper 0.012 0.010 0.0033 mg/L EPA 200.8 10/06/23 13:22 AJH Lead ND 0.010 0.0033 mg/L EPA 200.8 10/06/23 13:22 AJH
Mercury ND 0.20 0.11 ug/L SM 3112B 10/09/23 14:05 ALD
Nickel ND 0.010 0.0033 mg/L EPA 200.8 10/06/23 13:22 AJH Selenium ND 0.0050 0.0017 mg/L EPA 200.8 10/06/23 13:22 AJH Silver ND 10 2.3 ug/L EPA 200.8 10/06/23 13:22 AJH
Thallium ND 0.0010 0.00022 mg/L EPA 200.8 10/06/23 13:22 AJH Zinc 0.099 0.010 0.0050 mg/L EPA 200.8 10/06/23 13:22 AJH mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
317
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 3 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
Laboratory Reference Number
Sample Description
10/04/23 06:05
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Effluent Liquid
C3J0788-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Volatile Organic Compounds by EPA 624.1
1,1,1-Trichloroethane ND 0.50 0.17 ug/L EPA 624.1 10/07/23 00:01 JES 1,1,2,2-Tetrachloroethane ND 0.50 0.092 ug/L EPA 624.1 10/07/23 00:01 JES 1,1,2-Trichloroethane ND 0.50 0.10 ug/L EPA 624.1 10/07/23 00:01 JES 1,1-Dichloroethane ND 0.50 0.086 ug/L EPA 624.1 10/07/23 00:01 JES 1,1-Dichloroethene ND 0.50 0.14 ug/L EPA 624.1 10/07/23 00:01 JES 1,2-Dichlorobenzene ND 0.50 0.11 ug/L EPA 624.1 10/07/23 00:01 JES 1,2-Dichloroethane ND 0.50 0.11 ug/L EPA 624.1 10/07/23 00:01 JES 1,2-Dichloropropane ND 0.50 0.14 ug/L EPA 624.1 10/07/23 00:01 JES 1,3-Dichlorobenzene ND 0.50 0.11 ug/L EPA 624.1 10/07/23 00:01 JES 1,4-Dichlorobenzene ND 0.50 0.15 ug/L EPA 624.1 10/07/23 00:01 JES 2-Chloroethylvinyl Ether ND 5.0 1.4 ug/L EPA 624.1 10/07/23 00:01 JES NCEVE Acrolein ND 10 3.3 ug/L EPA 624.1 10/07/23 00:01 JES
Acrylonitrile ND 10 3.3 ug/L EPA 624.1 10/07/23 00:01 JES Benzene ND 0.50 0.11 ug/L EPA 624.1 10/07/23 00:01 JES
Bromodichloromethane ND 0.50 0.17 ug/L EPA 624.1 10/07/23 00:01 JES Bromoform ND 1.0 0.25 ug/L EPA 624.1 10/07/23 00:01 JES Bromomethane ND 0.50 0.18 ug/L EPA 624.1 10/07/23 00:01 JES Carbon Tetrachloride ND 0.50 0.088 ug/L EPA 624.1 10/07/23 00:01 JES Chlorobenzene ND 0.50 0.13 ug/L EPA 624.1 10/07/23 00:01 JES Chloroethane ND 0.50 0.24 ug/L EPA 624.1 10/07/23 00:01 JES Chloroform 0.10 0.50 0.098 ug/L EPA 624.1 10/07/23 00:01 JES J Chloromethane ND 0.50 0.12 ug/L EPA 624.1 10/07/23 00:01 JES cis-1,3-Dichloropropene ND 0.50 0.11 ug/L EPA 624.1 10/07/23 00:01 JES Dibromochloromethane 0.16 0.50 0.088 ug/L EPA 624.1 10/07/23 00:01 JES J Dichlorodifluoromethane ND 0.50 0.18 ug/L EPA 624.1 10/07/23 00:01 JES Ethylbenzene ND 0.50 0.17 ug/L EPA 624.1 10/07/23 00:01 JES Methyl tert Butyl Ether ND 5.0 1.7 ug/L EPA 624.1 10/07/23 00:01 JES Methylene Chloride ND 3.0 0.29 ug/L EPA 624.1 10/07/23 00:01 JES Tetrachloroethene ND 0.50 0.11 ug/L EPA 624.1 10/07/23 00:01 JES Toluene ND 0.50 0.11 ug/L EPA 624.1 10/07/23 00:01 JES
trans-1,2-Dichloroethene ND 0.50 0.12 ug/L EPA 624.1 10/07/23 00:01 JES trans-1,3-Dichloropropene ND 0.50 0.15 ug/L EPA 624.1 10/07/23 00:01 JES mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
318
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 4 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
Laboratory Reference Number
Sample Description
10/04/23 06:05
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Effluent Liquid
C3J0788-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Volatile Organic Compounds by EPA 624.1
Trichloroethene ND 0.50 0.10 ug/L EPA 624.1 10/07/23 00:01 JES Trichlorofluoromethane ND 5.0 2.1 ug/L EPA 624.1 10/07/23 00:01 JES Vinyl Chloride ND 0.50 0.10 ug/L EPA 624.1 10/07/23 00:01 JES Xylenes (m+p) ND 0.50 0.28 ug/L EPA 624.1 10/07/23 00:01 JES Xylenes (ortho) ND 0.50 0.17 ug/L EPA 624.1 10/07/23 00:01 JES Surrogate: 1,2-Dichloroethane-d4 103% 80-120 EPA 624.1 10/07/23 00:01 JES Surrogate: 4-Bromofluorobenzene 101% 80-120 EPA 624.1 10/07/23 00:01 JES Surrogate: Toluene-d8 95% 80-120 EPA 624.1 10/07/23 00:01 JES Surrogate: 1,2-Dichlorobenzene-d4 121% 80-120 EPA 624.1 10/07/23 00:01 JES NShi Semivolatile Organic Compounds by EPA 625.1
1,2,4-Trichlorobenzene ND 5.7 0.70 ug/L EPA 625.1 10/09/23 17:37 AZP 1,2-Diphenylhydrazine ND 10 0.66 ug/L EPA 625.1 10/09/23 17:37 AZP 2,4,6-Trichlorophenol ND 10 1.2 ug/L EPA 625.1 10/09/23 17:37 AZP 2,4-Dichlorophenol ND 8.1 1.3 ug/L EPA 625.1 10/09/23 17:37 AZP 2,4-Dimethylphenol ND 10 1.1 ug/L EPA 625.1 10/09/23 17:37 AZP 2,4-Dinitrophenol ND 50 3.0 ug/L EPA 625.1 10/09/23 17:37 AZP 2,4-Dinitrotoluene ND 10 1.2 ug/L EPA 625.1 10/09/23 17:37 AZP 2,6-Dinitrotoluene ND 5.7 1.0 ug/L EPA 625.1 10/09/23 17:37 AZP 2-Chloronaphthalene ND 5.7 1.1 ug/L EPA 625.1 10/09/23 17:37 AZP NLpas 2-Chlorophenol ND 9.9 1.3 ug/L EPA 625.1 10/09/23 17:37 AZP 2-Methyl-4,6-Dinitrophenol ND 50 1.9 ug/L EPA 625.1 10/09/23 17:37 AZP 2-Nitrophenol ND 10 1.5 ug/L EPA 625.1 10/09/23 17:37 AZP 3,3'-Dichlorobenzidine ND 20 0.66 ug/L EPA 625.1 10/09/23 17:37 AZP 4,4'-DDD ND 8.4 0.77 ug/L EPA 625.1 10/09/23 17:37 AZP
4,4'-DDE ND 10 1.1 ug/L EPA 625.1 10/09/23 17:37 AZP
4,4'-DDT ND 10 0.55 ug/L EPA 625.1 10/09/23 17:37 AZP
4-Bromophenyl phenyl ether ND 5.7 0.74 ug/L EPA 625.1 10/09/23 17:37 AZP 4-Chloro-3-methylphenol ND 9.0 0.99 ug/L EPA 625.1 10/09/23 17:37 AZP 4-Chlorophenyl phenyl ether ND 10 1.0 ug/L EPA 625.1 10/09/23 17:37 AZP 4-Nitrophenol ND 7.2 1.1 ug/L EPA 625.1 10/09/23 17:37 AZP mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
319
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 5 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
Laboratory Reference Number
Sample Description
10/04/23 06:05
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Effluent Liquid
C3J0788-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Semivolatile Organic Compounds by EPA 625.1
a-BHC ND 10 0.61 ug/L EPA 625.1 10/09/23 17:37 AZP
Acenaphthene ND 5.7 0.96 ug/L EPA 625.1 10/09/23 17:37 AZP Acenaphthylene ND 10 0.95 ug/L EPA 625.1 10/09/23 17:37 AZP Aldrin ND 5.7 0.95 ug/L EPA 625.1 10/09/23 17:37 AZP
Anthracene ND 5.7 0.84 ug/L EPA 625.1 10/09/23 17:37 AZP Aroclor 1016 (screen) ND 50 9.9 ug/L EPA 625.1 10/09/23 17:37 AZP Aroclor 1221 (screen) ND 50 50 ug/L EPA 625.1 10/09/23 17:37 AZP Aroclor 1232 (screen) ND 50 50 ug/L EPA 625.1 10/09/23 17:37 AZP Aroclor 1242 (screen) ND 50 50 ug/L EPA 625.1 10/09/23 17:37 AZP Aroclor 1248 (screen) ND 50 50 ug/L EPA 625.1 10/09/23 17:37 AZP Aroclor 1254 (screen) ND 50 50 ug/L EPA 625.1 10/09/23 17:37 AZP Aroclor 1260 (screen) ND 50 11 ug/L EPA 625.1 10/09/23 17:37 AZP b-BHC ND 9.3 0.67 ug/L EPA 625.1 10/09/23 17:37 AZP
Benzidine ND 50 0.89 ug/L EPA 625.1 10/09/23 17:37 AZP
Benzo(a)anthracene ND 10 1.0 ug/L EPA 625.1 10/09/23 17:37 AZP Benzo(a)pyrene ND 7.5 0.73 ug/L EPA 625.1 10/09/23 17:37 AZP Benzo(b)fluoranthene ND 10 0.50 ug/L EPA 625.1 10/09/23 17:37 AZP Benzo(ghi)perylene ND 10 1.6 ug/L EPA 625.1 10/09/23 17:37 AZP Benzo(k)fluoranthene ND 7.5 2.1 ug/L EPA 625.1 10/09/23 17:37 AZP Bis(2-chloroethoxy)methane ND 10 0.70 ug/L EPA 625.1 10/09/23 17:37 AZP Bis(2-Chloroethyl)ether ND 10 0.99 ug/L EPA 625.1 10/09/23 17:37 AZP Bis(2-chloroisopropyl)Ether ND 10 0.70 ug/L EPA 625.1 10/09/23 17:37 AZP Bis(2-ethylhexyl)phthalate ND 3.0 2.3 ug/L EPA 625.1 10/09/23 17:37 AZP Butyl benzyl phthalate ND 7.5 0.49 ug/L EPA 625.1 10/09/23 17:37 AZP Chlordane (screen) ND 10 1.8 ug/L EPA 625.1 10/09/23 17:37 AZP Chrysene ND 7.5 1.3 ug/L EPA 625.1 10/09/23 17:37 AZP
d-BHC ND 10 0.61 ug/L EPA 625.1 10/09/23 17:37 AZP
Di-n-butylphthalate ND 7.5 0.86 ug/L EPA 625.1 10/09/23 17:37 AZP Di-n-octylphthalate ND 7.5 1.4 ug/L EPA 625.1 10/09/23 17:37 AZP Dibenzo(a,h)anthracene ND 7.5 1.1 ug/L EPA 625.1 10/09/23 17:37 AZP Dieldrin ND 7.5 0.71 ug/L EPA 625.1 10/09/23 17:37 AZP
Diethyl phthalate ND 5.7 0.72 ug/L EPA 625.1 10/09/23 17:37 AZP mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
320
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 6 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
Laboratory Reference Number
Sample Description
10/04/23 06:05
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Effluent Liquid
C3J0788-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Semivolatile Organic Compounds by EPA 625.1
Dimethyl phthalate ND 4.8 0.54 ug/L EPA 625.1 10/09/23 17:37 AZP Endosulfan I ND 10 0.57 ug/L EPA 625.1 10/09/23 17:37 AZP NLpas Endosulfan II ND 10 0.96 ug/L EPA 625.1 10/09/23 17:37 AZP NLpas Endosulfan Sulfate ND 10 0.49 ug/L EPA 625.1 10/09/23 17:37 AZP Endrin ND 10 0.31 ug/L EPA 625.1 10/09/23 17:37 AZP
Fluoranthene ND 6.6 0.75 ug/L EPA 625.1 10/09/23 17:37 AZP Fluorene ND 5.7 0.93 ug/L EPA 625.1 10/09/23 17:37 AZP
Heptachlor ND 5.7 0.44 ug/L EPA 625.1 10/09/23 17:37 AZP Heptachlor Epoxide ND 6.6 0.60 ug/L EPA 625.1 10/09/23 17:37 AZP Hexachlorobenzene ND 5.7 0.69 ug/L EPA 625.1 10/09/23 17:37 AZP Hexachlorobutadiene ND 10 0.58 ug/L EPA 625.1 10/09/23 17:37 AZP Hexachlorocyclopentadiene ND 50 2.6 ug/L EPA 625.1 10/09/23 17:37 AZP Hexachloroethane ND 4.8 0.64 ug/L EPA 625.1 10/09/23 17:37 AZP Indeno(1,2,3-cd)pyrene ND 10 1.4 ug/L EPA 625.1 10/09/23 17:37 AZP Isophorone ND 6.6 0.75 ug/L EPA 625.1 10/09/23 17:37 AZP n-Nitrosodi-n-propylamine ND 10 0.71 ug/L EPA 625.1 10/09/23 17:37 AZP N-Nitrosodimethylamine ND 10 1.1 ug/L EPA 625.1 10/09/23 17:37 AZP N-Nitrosodiphenylamine ND 10 1.6 ug/L EPA 625.1 10/09/23 17:37 AZP Naphthalene ND 4.8 0.96 ug/L EPA 625.1 10/09/23 17:37 AZP Nitrobenzene ND 5.7 0.79 ug/L EPA 625.1 10/09/23 17:37 AZP Pentachlorophenol ND 11 1.9 ug/L EPA 625.1 10/09/23 17:37 AZP Phenanthrene ND 10 0.93 ug/L EPA 625.1 10/09/23 17:37 AZP Phenol ND 4.5 0.58 ug/L EPA 625.1 10/09/23 17:37 AZP
Pyrene ND 5.7 0.90 ug/L EPA 625.1 10/09/23 17:37 AZP
Toxaphene (screen) ND 50 18 ug/L EPA 625.1 10/09/23 17:37 AZP y-BHC ND 10 0.74 ug/L EPA 625.1 10/09/23 17:37 AZP
Surrogate: 2,4,6-Tribromophenol 54% 10-126 EPA 625.1 10/09/23 17:37 AZP Surrogate: 2-Fluorobiphenyl 43% 10-120 EPA 625.1 10/09/23 17:37 AZP Surrogate: 2-Fluorophenol 25% 10-120 EPA 625.1 10/09/23 17:37 AZP Surrogate: 4-Terphenyl-d14 62% 10-126 EPA 625.1 10/09/23 17:37 AZP Surrogate: Nitrobenzene-d5 38% 15-314 EPA 625.1 10/09/23 17:37 AZP mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
321
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 7 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
Laboratory Reference Number
Sample Description
10/04/23 06:05
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Effluent Liquid
C3J0788-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Semivolatile Organic Compounds by EPA 625.1
Surrogate: Phenol-d6 19% 10-120 EPA 625.1 10/09/23 17:37 AZP mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
322
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 33 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.

Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.

Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.

Approval
cc:

Alexis Nicole Harold For Cindy A. Waddell
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
323
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 34 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
324
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 35 of 35
Project Name:
19-Oct-2023 Work Order Number: C3J0788
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Effluent M/J/S/D
Adelanto WWTP
C3J0788
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
325
WorkOrder:

Report Created for: Babcock Laboratories, Inc.
6100 Quail Valley Court
Riverside, CA 92507-0704
Project Contact: Cindy A. Waddell
Project: C3J0788
Project P.O.:

Project Received: 10/06/2023
Analytical Report reviewed & approved for release on 10/13/2023 by:

Yen Cao
2310492
The report shall not be reproduced except in full, without the written approval of the laboratory. The analytical results relate only to the items tested. Results reported conform to the most current NELAP standards, where applicable, unless otherwise stated in a case narrative.

Analytical Report
1534 Willow Pass Rd. Pittsburg, CA 94565 ♦ TEL: (877) 252-9262 ♦ FAX: (925) 252-9269 ♦ www.mccampbell.com CA ELAP 1644 ♦ NELAP 4033 ORELAP
Project Manager
McCampbell Analytical, Inc.
"When Quality Counts"
326

Page 1 of 9 ends

Glossary of Terms & Qualifier Definitions
Client: Babcock Laboratories, Inc.

Project: C3J0788
WorkOrder: 2310492
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Glossary Abbreviation
%D Serial Dilution Percent Difference
95% Interval 95% Confident Interval
CPT Consumer Product Testing not NELAP Accredited
DF Dilution Factor
DI WET (DISTLC) Waste Extraction Test using DI water
DISS Dissolved (direct analysis of 0.45 µm filtered and acidified water sample) DLT Dilution Test (Serial Dilution)
DUP Duplicate
EDL Estimated Detection Limit
ERS External reference sample. Second source calibration verification.

ITEF International Toxicity Equivalence Factor
LCS Laboratory Control Sample
LCS2 Second LCS for the batch. Spike level is lower than that for the first LCS; applicable to method 1633.

LQL Lowest Quantitation Level
MB Method Blank
MB % Rec % Recovery of Surrogate in Method Blank, if applicable MDL Method Detection Limit ¹
ML Minimum Level of Quantitation
MS Matrix Spike
MSD Matrix Spike Duplicate
NA Not Applicable
ND Not detected at or above the indicated MDL or RL
NR Data Not Reported due to matrix interference or insufficient sample amount.

PDS Post Digestion Spike
PF Prep Factor
RD Relative Difference
RL Reporting Limit ²
RPD Relative Percent Difference
RRT Relative Retention Time
RSD Relative Standard Deviation
SNR Surrogate is diluted out of the calibration range
SPK Val Spike Value
SPKRef Val Spike Reference Value
SPLP Synthetic Precipitation Leachate Procedure
¹ MDL is the minimum measured concentration of a substance that can be reported with 99% confidence that the measured concentration is distinguishable from method blank results. Definition and Procedure for the Determination of the Method Detection Limit, Revision 2, 40CFR, Part 136, Appendix B, EPA 821-R-16-006, December 2016. Values are based upon our default extraction volume/amount and are subject to change.
² RL is the lowest level that can be reliably determined within specified limits of precision and accuracy during routine laboratory operating conditions. (The RL cannot be lower than the lowest calibration standard used in the initial calibration of the instrument and must be greater than the MDL.) Values are based upon our default extraction volume/amount and are subject to change. 327

Page 2 of 9 ends

Glossary of Terms & Qualifier Definitions
Client: Babcock Laboratories, Inc.

Project: C3J0788
WorkOrder: 2310492
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" ST Sorbent Tube
TCLP Toxicity Characteristic Leachate Procedure
TEQ Toxicity Equivalents
TNTC “Too Numerous to Count;” greater than 250 colonies observed on the plate.

TZA TimeZone Net Adjustment for sample collected outside of MAI's UTC.

WET (STLC) Waste Extraction Test (Soluble Threshold Limit Concentration) Analytical Qualifiers
F Sample was filtered upon arrival to the lab.
a1 Sample diluted due to matrix interference.
328

Page 3 of 9 ends

Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Babcock Laboratories, Inc.

Project: C3J0788
Date Received: 10/06/2023 10:09
Date Prepared: 10/12/2023
WorkOrder: 2310492
Extraction Method: E218.6
Analytical Method: E218.6
Unit: µg/L
Hexavalent chromium by IC
C3J0788-01 2310492-001A Water 10/04/2023 06:05 IC2 23101222.CHW 279766 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Hexavalent chromium ND F 1.2 2.0 10 10/12/2023 14:05
Analyst(s): ND Analytical Comments: a1
CA ELAP 1644 • NELAP 4033ORELAP
329

Page 4 of 9 ends

Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Babcock Laboratories, Inc.

Project: C3J0788
Date Analyzed: 10/09/2023 - 10/12/2023
Date Prepared: 10/09/2023 - 10/12/2023
WorkOrder: 2310492
BatchID: 279766
Analytical Method: E218.6
Unit: µg/L
Sample ID: MB/LCS/LCSD-279766
Instrument: IC2
Matrix: Water
Extraction Method: E218.6
QC Summary Report for E218.6
Analyte MB
Result
MDL RL
Hexavalent chromium ND 0.12 0.20 - - -
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC

LCS/LCSD
Limits

RPD RPD
Limit
Hexavalent chromium 1.0 0.98 1 100 98 90-110 1.92 10
CA ELAP 1644 • NELAP 4033ORELAP
330

Page 5 of 9 ends

McCampbell Analytical, Inc.
1534 Willow Pass Rd
Pittsburg, CA 94565-1701
(925) 252-9262
CHAIN-OF-CUSTODY RECORD Page
Lab ID Matrix Collection Date Hold
Requested Tests (See legend below)
Report to:

Cindy A. Waddell
6100 Quail Valley Court
Riverside, CA 92507-0704
(951) 653-3351 FAX: (951) 653-1662
PO:
10/06/2023
ClientSampID
Project: C3J0788
WorkOrder: 2310492
1 of 1
Date Logged:

Date Received: 10/06/2023
1 2 3 4 5 6 7 8 9 10 11 12
Babcock Laboratories, Inc.

Bill to:

Cindy A. Waddell
Babcock Laboratories, Inc.
6100 Quail Valley Court
Riverside, CA 92507-0704
Requested TAT: 5 days;
ClientCode: BLIR
Email: [email protected]
EDF EQuIS Email HardCopy ThirdParty
[email protected]; tlynnkearns@b
Excel
CLIP J-flag
cc/3rd Party:

WaterTrax
Detection Summary
Dry-Weight
2310492-001 C3J0788-01 Water 10/4/2023 06:05 A A A A
Prepared by: Agustina Venegas
NOTE: Soil samples are discarded 60 days after receipt unless other arrangements are made (Water samples are 30 days).

Hazardous samples will be returned to client or disposed of at client expense.

Comments:
1 218_6_W 2 PRDisposal Fee 3 PRDISSOLVED 4 PREDF REPORT 5 6 7 8
9 10
Test Legend:
11 12
331

Page 6 of 9 ends

LabID ClientSampID Collection Date
& Time
Date Logged:

Matrix Test Name Containers TAT
/Composites

WORK ORDER SUMMARY
Work Order: 2310492
Comments:

Client Name: BABCOCK LABORATORIES, INC. Project: C3J0788 QC Level: LEVEL 2
Dry- Hold
Weight
Sub
Out
Bottle &
Preservative
10/6/2023
Sediment
Content
CLIP EDF Excel EQuIS Email HardCopy ThirdParty J-flag
Client Contact: Cindy A. Waddell
Contact's Email: [email protected]
WaterTrax
Head Test Due Date
Space
U**
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" 001A C3J0788-01 Water E218.6 (Hexavalent chromium ) 1 125mL HDPE w/ 10/4/2023 6:05 5 days NH42SO4+NH4OH
10/13/2023 Present

Page 1 of 1 ends

* STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results in 3 days from sample submission).

NOTES:
- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from the sample prior to sample preparation unless requested in writing by the client.

U** = An unpreserved container was received for a method that suggests a preservation in order to extend hold time for analysis. - Organic extracts are held for 40 days before disposal; Inorganic extract are held for 30 days. 332

Page 7 of 9 ends

333

Page 8 of 9 ends

Sample Receipt Checklist
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client Name: Babcock Laboratories, Inc.

WorkOrder №: 2310492
Date Logged: 10/6/2023
Matrix: Water Logged by: Agustina Venegas
Carrier: FedEx
Shipping container/cooler in good condition? Yes No
Custody seals intact on shipping container/cooler? Yes No NA Samples Received on Ice? Yes No
Chain of custody present? Yes No
Chain of custody signed when relinquished and received? Yes No Chain of custody agrees with sample labels? Yes No
Samples in proper containers/bottles? Yes No
Sample containers intact? Yes No
Sufficient sample volume for indicated test? Yes No
All samples received within holding time? Yes No NA
Sample/Temp Blank temperature NA
ZHS conditional analyses: VOA meets zero headspace Yes No NA requirement (VOCs, TPHg/BTEX, RSK)?
pH acceptable upon receipt (Metal: <2; Nitrate 353.2/4500NO3:
<2; 522: <4; 218.7: >8)?
Yes No NA
Temp: 1.5°C
Chain of Custo dy (COC) Info rmatio n
Sample IDs noted by Client on COC? Yes No
Date and Time of collection noted by Client on COC? Yes No Sampler's name noted on COC? Yes No
Sample Receipt Inform ation
Sample Preservatio n and Hold Time (HT) Informatio n
Sample labels checked for correct preservation? Yes No
Project: C3J0788
(Ice Type: WET ICE )
Comments:
pH tested and acceptable upon receipt (200.7: ≤2; 533: 6 - 8; 537.1: 6 - 8)?
Yes No NA
UCMR Samples:

Free Chlorine tested and acceptable upon receipt (<0.1mg/L) [not applicable to 200.7]?
Yes No NA
Date and Time Received: 10/6/2023 10:09
Received by: Agustina Venegas
COC agrees with Quote? Yes No NA
Custody seals intact on sample bottles? Yes No NA
334

Page 9 of 9 ends

Client Name:

Report Date:

Adelanto, CA 92301
Contact:

Address:
31-Oct-2023
Analytical Report:

Project Number:

Page 1 of 2 ends

Project Name:

Work Order Number:

Received on Ice (Y/N): Yes Temp: °C 13
PERC Water Corp
Dave Kachelski
19101 Jonathan St.

PERC - Quarterly Solids J/A/J/O
Adelanto WWTP
C3J0760
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.

Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.

Lab Sample # Client Sample ID Matrix Date Sampled
Sample Identification
By Date Submitted By
C3J0760-01 Sludge 10/4/23 7:00 Tristan Hause 10/4/23 13:14 Courier (Guillermo)
Bio-Solids ---ROUTINE---
e-Case Narrative+ COC.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.

Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.

Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.

Approval
cc:

Cindy A. Waddell

Page 1 of 2 ends

mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
335
Client Name:

Report Date:

Adelanto, CA 92301
Contact:

Address:
31-Oct-2023
Analytical Report:

Project Number:

Page 2 of 2 ends

Project Name:

Work Order Number:

Received on Ice (Y/N): Yes Temp: °C 13
PERC Water Corp
Dave Kachelski
19101 Jonathan St.

PERC - Quarterly Solids J/A/J/O
Adelanto WWTP
C3J0760

Page 2 of 2 ends

mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
336

ANALYTICAL REPORT

PREPARED FOR
Attn: Cindy A Waddell
Babcock Laboratories, Inc.
6100 Quail Valley Court
Riverside, California 92507
Generated 10/13/2023 7:00:51 AM

JOB DESCRIPTION
C3J0760

JOB NUMBER
570-155786-1
See page two for job notes and contact information.

Tustin CA 92780
2841 Dow Avenue, Suite 100
Eurofins Calscience

Page 1 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
337
Eurofins Calscience
Eurofins Calscience is a laboratory within Eurofins Environment Testing Southwest, LLC, a company within Eurofins Environment Testing Group of Companies Job Notes
This report may not be reproduced except in full, and with written approval from the laboratory. The results relate only to the samples tested. For questions please contact the Project Manager at the e-mail address or telephone number listed on this page.

The test results in this report relate only to the samples as received by the laboratory and will meet all requirements of the methodology, with any exceptions noted. This report shall not be reproduced except in full, without the express written approval of the laboratory. All questions should be directed to the Eurofins Calscience Project Manager.

Authorization
Generated
10/13/2023 7:00:51 AM
Authorized for release by
Carla Hollowell, Project Manager I
[email protected]
(714)895-5494

Page 2 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
338
Table of Contents
Client: Babcock Laboratories, Inc.

Project/Site: C3J0760
Laboratory Job ID: 570-155786-1

Page 3 of 14 ends

Eurofins Calscience
10/13/2023
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Definitions/Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Case Narrative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Client Sample Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 QC Sample Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Lab Chronicle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Certification Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Method Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Sample Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Chain of Custody . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Receipt Checklists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 1 2
3 4
5 6
7 8
9 10
11 12
339
Definitions/Glossary
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
Glossary
These commonly used abbreviations may or may not be present in this report. ¤ Listed under the "D" column to designate that the result is reported on a dry weight basis Abbreviation
%R Percent Recovery
CFL Contains Free Liquid
CFU Colony Forming Unit
CNF Contains No Free Liquid
DER Duplicate Error Ratio (normalized absolute difference) Dil Fac Dilution Factor
DL Detection Limit (DoD/DOE)
DL, RA, RE, IN Indicates a Dilution, Re-analysis, Re-extraction, or additional Initial metals/anion analysis of the sample DLC Decision Level Concentration (Radiochemistry)
EDL Estimated Detection Limit (Dioxin)
LOD Limit of Detection (DoD/DOE)
LOQ Limit of Quantitation (DoD/DOE)
MCL EPA recommended "Maximum Contaminant Level"
MDA Minimum Detectable Activity (Radiochemistry)
MDC Minimum Detectable Concentration (Radiochemistry)
MDL Method Detection Limit
ML Minimum Level (Dioxin)
MPN Most Probable Number
MQL Method Quantitation Limit
NC Not Calculated
ND Not Detected at the reporting limit (or MDL or EDL if shown) NEG Negative / Absent
POS Positive / Present
PQL Practical Quantitation Limit
PRES Presumptive
QC Quality Control
RER Relative Error Ratio (Radiochemistry)
RL Reporting Limit or Requested Limit (Radiochemistry)
RPD Relative Percent Difference, a measure of the relative difference between two points TEF Toxicity Equivalent Factor (Dioxin)
TEQ Toxicity Equivalent Quotient (Dioxin)
TNTC Too Numerous To Count
Eurofins Calscience

Page 4 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
340
Case Narrative
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
Job ID: 570-155786-1
Laboratory: Eurofins Calscience
Narrative
Job Narrative
570-155786-1
Analytical test results meet all requirements of the associated regulatory program listed on the Accreditation/Certification Summary Page unless otherwise noted under the individual analysis. Data qualifiers are applied to indicate exceptions. Noncompliant quality control (QC) is further explained in narrative comments.

Matrix QC may not be reported if insufficient sample or site-specific QC samples were not submitted. In these situations, to demonstrate precision and accuracy at a batch level, a LCS/LCSD may be performed, unless otherwise specified in the method.

Surrogate and/or isotope dilution analyte recoveries (if applicable) which are outside of the QC window are confirmed unless attributed to a dilution or otherwise noted in the narrative.

Regulated compliance samples (e.g. SDWA, NPDES) must comply with the associated agency requirements/permits.

Receipt
The sample was received on 10/6/2023 7:15 AM. Unless otherwise noted below, the sample arrived in good condition, and, where required, properly preserved and on ice. The temperature of the cooler at receipt time was 2.8°C General Chemistry
Method 7196A: The following sample was diluted due to the nature of the sample matrix: C3J0760-01 (570-155786-1). Elevated reporting limits (RLs) are provided.

No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.

Eurofins Calscience Page 5 of 14 10/13/2023
1 2
3 4
5 6
7 8
9 10
11 12
341
Client Sample Results
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
General Chemistry
Client Sample ID: C3J0760-01 Lab Sample ID: 570-155786-1 Date Collected: 10/04/23 07:00 Matrix: Solid
Date Received: 10/06/23 07:15
RL
ND 36.1 mg/Kg ☼ 10/12/23 20:01 10/13/23 01:01 10
Analyte Result Qualifier Unit D Prepared Analyzed Dil Fac Cr (VI) (SW846 7196A)
Percent Solids (EPA Moisture) 22.0 0.1 % 10/09/23 19:20 1 Eurofins Calscience

Page 6 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
342
QC Sample Results
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
Method: 7196A - Chromium, Hexavalent
Lab Sample ID: MB 570-373261/1-A Client Sample ID: Method Blank Matrix: Solid Prep Type: Total/NA
Analysis Batch: 373307 Prep Batch: 373261
RL
Cr (VI) ND 0.800 mg/Kg 10/12/23 20:01 10/13/23 00:56 1
MB MB
Analyte Result Qualifier Unit D Prepared Analyzed Dil Fac Lab Sample ID: LCS 570-373261/2-A Client Sample ID: Lab Control Sample Matrix: Solid Prep Type: Total/NA
Analysis Batch: 373307 Prep Batch: 373261
Cr (VI) 19.9 20.48 mg/Kg 103 78 - 120
Analyte

LCS LCS
Result Qualifier Unit D %Rec
Spike
Added
%Rec
Limits
Lab Sample ID: LCSD 570-373261/3-A Client Sample ID: Lab Control Sample Dup Matrix: Solid Prep Type: Total/NA
Analysis Batch: 373307 Prep Batch: 373261
Cr (VI) 19.9 20.45 mg/Kg 103 78 - 120 0 20
Analyte

LCSD LCSD
Result Qualifier Unit D %Rec
Spike
Added
%Rec
Limits RPD Limit
RPD
Eurofins Calscience

Page 7 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
343
Lab Chronicle
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
Client Sample ID: C3J0760-01 Lab Sample ID: 570-155786-1 Date Collected: 10/04/23 07:00 Matrix: Solid
Date Received: 10/06/23 07:15
Prep 3060A 373261 10/12/23 20:01 JXO4 EET CAL 4
Type
Batch
Method
Batch
Prep Type Run Analyst Lab
Prepared
or Analyzed
Initial
Amount Amount
Final Batch
Factor Number
Dil
Total/NA 2.51 g 100 mL
Total/NA Analysis 7196A 10 10 mL 10 mL 373307 10/13/23 01:01 JXO4 EET CAL 4 Instrument ID: UV8
Total/NA Analysis Moisture 1 372034 10/09/23 19:20 B4QL EET CAL 4 Instrument ID: BAL87
Laboratory References:

EET CAL 4 = Eurofins Calscience Tustin, 2841 Dow Avenue, Tustin, CA 92780, TEL (714)895-5494 Eurofins Calscience

Page 8 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
344
Accreditation/Certification Summary
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
Laboratory: Eurofins Calscience
Unless otherwise noted, all analytes for this laboratory were covered under each accreditation/certification below.

Authority Program Identification Number Expiration Date California State 3082 07-31-24
The following analytes are included in this report, but the laboratory is not certified by the governing authority. This list may include analytes for which the agency does not offer certification.

Analysis Method Prep Method Matrix Analyte
Moisture Solid Percent Solids
Eurofins Calscience

Page 9 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
345
Method Summary
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
Method Method Description Protocol Laboratory
7196A Chromium, Hexavalent SW846 EET CAL 4
Moisture Percent Moisture EPA EET CAL 4
3060A Alkaline Digestion (Chromium, Hexavalent) SW846 EET CAL 4 Protocol References:

EPA = US Environmental Protection Agency
SW846 = "Test Methods For Evaluating Solid Waste, Physical/Chemical Methods", Third Edition, November 1986 And Its Updates.

Laboratory References:

EET CAL 4 = Eurofins Calscience Tustin, 2841 Dow Avenue, Tustin, CA 92780, TEL (714)895-5494 Eurofins Calscience

Page 10 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
346
Sample Summary
Client: Babcock Laboratories, Inc. Job ID: 570-155786-1 Project/Site: C3J0760
Lab Sample ID Client Sample ID Matrix Collected Received 570-155786-1 C3J0760-01 Solid 10/04/23 07:00 10/06/23 07:15 Eurofins Calscience Page 11 of 14 10/13/2023
1 2
3 4
5 6
7 8
9 10
11 12
347

Page 12 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
348

Page 13 of 14 ends

1 2
3 4
5 6
7 8
9 10
11 12
349
Login Sample Receipt Checklist
Client: Babcock Laboratories, Inc. Job Number: 570-155786-1 Login Number: 155786
Question Answer Comment
Creator: Patel, Jayesh
List Source: Eurofins Calscience
List Number: 1
Radioactivity wasn't checked or is </= background as measured by a survey N/A meter.

The cooler's custody seal, if present, is intact. True
Sample custody seals, if present, are intact. True
The cooler or samples do not appear to have been compromised or True tampered with.

Samples were received on ice. True
Cooler Temperature is acceptable. True
Cooler Temperature is recorded. True
COC is present. True
COC is filled out in ink and legible. True
COC is filled out with all pertinent information. True
Is the Field Sampler's name present on COC? True
There are no discrepancies between the containers received and the COC. True Samples are received within Holding Time (excluding tests with immediate True HTs)
Sample containers have legible labels. True
Containers are not broken or leaking. True
Sample collection date/times are provided. True
Appropriate sample containers are used. True
Sample bottles are completely filled. True
Sample Preservation Verified. True
There is sufficient vol. for all requested analyses, incl. any requested True MS/MSDs
Containers requiring zero headspace have no headspace or bubble is True <6mm (1/4").

Multiphasic samples are not present. True
Samples do not require splitting or compositing. True
Residual Chlorine Checked. N/A
Eurofins Calscience Page 14 of 14 10/13/2023
1 2
3 4
5 6
7 8
9 10
11 12
350
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 1 of 15
Project Name:
03-Nov-2023
Work Order Number: C3J0759
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Solids J/A/J/O
Adelanto WWTP
C3J0759
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.

Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.

Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C3J0759-01 Sludge 10/4/23 7:00 Tristan Hause Courier
(Guillermo)-DE
Bio-Solids ---ROUTINE--- 10/04/23 13:14
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
351
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 2 of 15
Project Name:
03-Nov-2023
Work Order Number: C3J0759
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Solids J/A/J/O
Adelanto WWTP
C3J0759
Laboratory Reference Number
Sample Description
10/04/23 07:00
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Bio-Solids Sludge
C3J0759-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 41 9.2 4.9 mg/kg dry EPA 300.0 10/06/23 08:01 EZM N_WEX Nitrite as N ND 4.6 4.6 mg/kg dry EPA 300.0 10/06/23 08:01 EZM N_WEX, NMint
Solids
Total Solids 22 0.10 0.10 % SM 2540G 10/06/23 15:08 GMB Nutrients
Ammonia-Nitrogen 2500 240 mg/Kg* dry SM4500NH3H
G
200 10/12/23 00:12 AMB N_WEX,
NMout
Kjeldahl Nitrogen 64000 9200 9200 mg/kg dry EPA 351.2 10/26/23 16:07 ANM Metals and Metalloids; EPA SW846 Series
Aluminum 4400 10 3.6 mg/kg dry EPA 6010B 10/18/23 05:37 YVD Antimony ND 2.0 0.88 mg/kg dry EPA 6020 10/12/23 17:02 AJH N_RLm Arsenic 4.1 2.0 1.2 mg/kg dry EPA 6020 10/12/23 17:02 AJH Barium 150 2.0 2.0 mg/kg dry EPA 6020 10/12/23 17:02 AJH Beryllium ND 2.0 1.0 mg/kg dry EPA 6020 10/12/23 17:02 AJH N_RLm Boron 120 50 1.3 mg/kg dry EPA 6010B 10/18/23 05:37 YVD Cadmium ND 2.0 0.93 mg/kg dry EPA 6020 10/12/23 17:02 AJH N_RLm Total Chromium 19 2.0 1.8 mg/kg dry EPA 6020 10/12/23 17:02 AJH Cobalt 1.4 2.0 0.84 mg/kg dry EPA 6020 10/12/23 17:02 AJH J Copper 440 2.0 1.3 mg/kg dry EPA 6020 10/12/23 17:02 AJH Iron 5000 20 1.9 mg/kg dry EPA 6010B 10/18/23 05:37 YVD Lead 3.2 4.0 0.83 mg/kg dry EPA 6020 10/12/23 17:02 AJH J Manganese 300 20 6.7 mg/kg dry EPA 6020 10/12/23 17:02 AJH Mercury 0.29 0.45 0.15 mg/kg dry EPA 7471A 10/10/23 13:56 ALD J Molybdenum 8.5 10 3.3 mg/kg dry EPA 6020 10/12/23 17:02 AJH J Nickel 10 2.0 0.86 mg/kg dry EPA 6020 10/12/23 17:02 AJH Selenium 5.6 10 3.5 mg/kg dry EPA 6020 10/12/23 17:02 AJH J Thallium ND 2.0 0.87 mg/kg dry EPA 6020 10/12/23 17:02 AJH N_RLm Vanadium 33 20 9.5 mg/kg dry EPA 6020 10/12/23 17:02 AJH Zinc 210 20 6.7 mg/kg dry EPA 6020 10/12/23 17:02 AJH
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
352
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 3 of 15
Project Name:
03-Nov-2023
Work Order Number: C3J0759
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Solids J/A/J/O
Adelanto WWTP
C3J0759
Laboratory Reference Number
Sample Description
10/04/23 07:00
Sampled Date/Time Received Date/Time
10/04/23 13:14
Matrix
Bio-Solids Sludge
C3J0759-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Multiple Tube Fermentation - Multiple Dilution - SM 9221 B, E, F series Total Coliform 92000 82000 82000 MPN/g dry SM 9221B 10/04/23 19:30 CES Fecal Coliform <82000 82000 82000 MPN/g dry SM 9221E 10/04/23 19:30 CES * NELAP does not offer accreditation for this analyte/method/matrix combination mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
353
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 14 of 15
Project Name:
03-Nov-2023
Work Order Number: C3J0759
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Solids J/A/J/O
Adelanto WWTP
C3J0759
e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.

Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.

Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.

Approval
cc:

Cindy A. Waddell
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
354
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 15 of 15
Project Name:
03-Nov-2023
Work Order Number: C3J0759
Received on Ice (Y/N): Yes Temp: °C 13
PERC - Quarterly Solids J/A/J/O
Adelanto WWTP
C3J0759
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
355
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 1 of 9
Project Name:
31-Oct-2023 Work Order Number: C3J1701
Received on Ice (Y/N): Yes Temp: °C 9
PERC - Weekly WW
Adelanto WWTP
C3J1701
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.

Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.

Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C3J1701-01 Liquid 10/11/23 6:30 Jared
Kachelski
Courier
(Guillermo)-DE
Influent ---ROUTINE--- 10/11/23 12:19
C3J1701-02 Liquid 10/11/23 6:40 Jared
Kachelski
Courier
(Guillermo)-DE
Effluent ---ROUTINE--- 10/11/23 12:19
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
356
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 2 of 9
Project Name:
31-Oct-2023 Work Order Number: C3J1701
Received on Ice (Y/N): Yes Temp: °C 9
PERC - Weekly WW
Adelanto WWTP
C3J1701
Laboratory Reference Number
Sample Description
10/11/23 06:30
Sampled Date/Time Received Date/Time
10/11/23 12:19
Matrix
Influent Liquid
C3J1701-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Suspended Solids 210 5 5 mg/L SM 2540D 10/13/23 17:45 BXR Aggregate Organic Compounds
Biochemical Oxygen Demand 210 50 50 mg/L SM 5210B 10/11/23 21:39 DFL Nutrients
Ammonia-Nitrogen 38 5.1 4.5 mg/L SM 4500NH3 G 10/17/23 15:28 GMB mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
357
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 3 of 9
Project Name:
31-Oct-2023 Work Order Number: C3J1701
Received on Ice (Y/N): Yes Temp: °C 9
PERC - Weekly WW
Adelanto WWTP
C3J1701
Laboratory Reference Number
Sample Description
10/11/23 06:40
Sampled Date/Time Received Date/Time
10/11/23 12:19
Matrix
Effluent Liquid
C3J1701-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.75 0.20 0.12 mg/L EPA 300.0 10/11/23 23:09 AXM Nitrite as N ND 0.1 0.09 mg/L EPA 300.0 10/11/23 23:09 AXM Solids
Total Suspended Solids 2 0.5 0.5 mg/L SM 2540D 10/13/23 17:45 BXR Aggregate Organic Compounds
Biochemical Oxygen Demand ND 5.0 5.0 mg/L SM 5210B 10/11/23 21:43 DFL Nutrients
Ammonia-Nitrogen 0.1 0.1 0.09 mg/L SM 4500NH3 G 10/17/23 15:30 GMB Kjeldahl Nitrogen 0.5 0.1 0.1 mg/L EPA 351.2 10/24/23 20:04 AMB Total Nitrogen 1.3 0.40 mg/L Calculation
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
358
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 8 of 9
Project Name:
31-Oct-2023 Work Order Number: C3J1701
Received on Ice (Y/N): Yes Temp: °C 9
PERC - Weekly WW
Adelanto WWTP
C3J1701
Notes and Definitions
J Estimated value
QFpas Follow-up result within laboratory acceptance criteria.

QMoRo MSD recovery and the MS/MSD RPD value did not meet laboratory acceptance criteria.

NR: Not Reported
ND: Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL: Reportable Detection Limit
MDL: Method Detection Limit
* / (Non-NELAP): NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.

Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.

Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.

Approval
cc:

Cindy A. Waddell
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
359
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 9 of 9
Project Name:
31-Oct-2023 Work Order Number: C3J1701
Received on Ice (Y/N): Yes Temp: °C 9
PERC - Weekly WW
Adelanto WWTP
C3J1701
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
360
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 1 of 10
Project Name:
31-Oct-2023 Work Order Number: C3J2927
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J2927
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.

Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.

Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C3J2927-01 Liquid 10/18/23 6:10 Tristan Hause Courier
(Guillermo)-DE
Influent ---ROUTINE--- 10/18/23 12:02
C3J2927-02 Liquid 10/18/23 6:20 Tristan Hause Courier
(Guillermo)-DE
Effluent ---ROUTINE--- 10/18/23 12:02
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
361
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 2 of 10
Project Name:
31-Oct-2023 Work Order Number: C3J2927
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J2927
Laboratory Reference Number
Sample Description
10/18/23 06:10
Sampled Date/Time Received Date/Time
10/18/23 12:02
Matrix
Influent Liquid
C3J2927-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Dissolved Solids 760 20 20 mg/L SM 2540C 10/20/23 10:51 CSS Total Suspended Solids 190 10 10 mg/L SM 2540D 10/20/23 15:18 RUB Aggregate Organic Compounds
Biochemical Oxygen Demand 170 50 50 mg/L SM 5210B 10/19/23 14:54 EZM N-BOD1 Nutrients
Ammonia-Nitrogen 39 5.1 4.5 mg/L SM 4500NH3 G 10/20/23 12:18 GMB mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
362
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 3 of 10
Project Name:
31-Oct-2023 Work Order Number: C3J2927
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J2927
Laboratory Reference Number
Sample Description
10/18/23 06:20
Sampled Date/Time Received Date/Time
10/18/23 12:02
Matrix
Effluent Liquid
C3J2927-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.97 0.20 0.12 mg/L EPA 300.0 10/19/23 09:13 ANM Nitrite as N ND 0.1 0.09 mg/L EPA 300.0 10/19/23 09:13 ANM Solids
Total Dissolved Solids 480 10 10 mg/L SM 2540C 10/20/23 10:51 CSS Total Suspended Solids 2 0.5 0.5 mg/L SM 2540D 10/20/23 15:18 RUB Aggregate Organic Compounds
Biochemical Oxygen Demand ND 5.0 5.0 mg/L SM 5210B 10/19/23 14:57 EZM N-BOD1 Surfactants
MBAS ND 0.08 0.05 mg/L SM 5540C 10/19/23 20:34 DFL
Nutrients
Ammonia-Nitrogen 0.4 0.1 0.09 mg/L SM 4500NH3 G 10/20/23 12:20 GMB Kjeldahl Nitrogen 1.3 0.1 0.1 mg/L EPA 351.2 10/27/23 22:40 NR Total Nitrogen 2.3 0.40 mg/L Calculation
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
363
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 9 of 10
Project Name:
31-Oct-2023 Work Order Number: C3J2927
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J2927
Notes and Definitions
J Estimated value
N-BOD1 Dilution water blank exceeds 0.20 mg/L. As per method, data is reportable as qualified.

QFini Follow-up result also did not meet laboratory acceptance criteria.

QMout MS and/or MSD recovery did not meet laboratory acceptance criteria.

NR: Not Reported
ND: Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL: Reportable Detection Limit
MDL: Method Detection Limit
* / (Non-NELAP): NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.

Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.

Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.

Approval
cc:

Cindy A. Waddell
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
364
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 10 of 10
Project Name:
31-Oct-2023 Work Order Number: C3J2927
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly/BiWeekly WW
Adelanto WWTP
C3J2927
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
365
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 1 of 10
Project Name:
17-Nov-2023
Work Order Number: C3J3719
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly WW
Adelanto WWTP
C3J3719
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.

Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.

Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C3J3719-01 Liquid 10/25/23 6:35 Jared
Kachelski
Courier
(Guillermo)-DE
Influent ---ROUTINE--- 10/25/23 11:54
C3J3719-02 Liquid 10/25/23 6:10 Jared
Kachelski
Courier
(Guillermo)-DE
Effluent ---ROUTINE--- 10/25/23 11:54
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
366
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 2 of 10
Project Name:
17-Nov-2023
Work Order Number: C3J3719
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly WW
Adelanto WWTP
C3J3719
Laboratory Reference Number
Sample Description
10/25/23 06:35
Sampled Date/Time Received Date/Time
10/25/23 11:54
Matrix
Influent Liquid
C3J3719-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Suspended Solids 200 10 10 mg/L SM 2540D 10/26/23 16:19 BXR Aggregate Organic Compounds
Biochemical Oxygen Demand 240 50 50 mg/L SM 5210B 10/25/23 21:12 DFL N-BOD1 Nutrients
Ammonia-Nitrogen 42 5.1 4.5 mg/L SM 4500NH3 G 11/13/23 13:44 GMB mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
367
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 3 of 10
Project Name:
17-Nov-2023
Work Order Number: C3J3719
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly WW
Adelanto WWTP
C3J3719
Laboratory Reference Number
Sample Description
10/25/23 06:10
Sampled Date/Time Received Date/Time
10/25/23 11:54
Matrix
Effluent Liquid
C3J3719-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.80 0.20 0.12 mg/L EPA 300.0 10/25/23 19:02 EZV Nitrite as N ND 0.1 0.09 mg/L EPA 300.0 10/25/23 19:02 EZV Solids
Total Suspended Solids 2 0.5 0.5 mg/L SM 2540D 10/26/23 16:19 BXR Aggregate Organic Compounds
Biochemical Oxygen Demand ND 5.0 5.0 mg/L SM 5210B 10/25/23 21:16 DFL N-BOD1 Nutrients
Ammonia-Nitrogen 0.4 0.1 0.09 mg/L SM 4500NH3 G 11/13/23 13:44 GMB Kjeldahl Nitrogen 0.9 0.1 0.1 mg/L EPA 351.2 11/15/23 19:03 JXM Total Nitrogen 1.7 0.40 mg/L Calculation
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
368
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 9 of 10
Project Name:
17-Nov-2023
Work Order Number: C3J3719
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly WW
Adelanto WWTP
C3J3719
Notes and Definitions
J Estimated value
N-BOD1 Dilution water blank exceeds 0.20 mg/L. As per method, data is reportable as qualified.

NR: Not Reported
ND: Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL: Reportable Detection Limit
MDL: Method Detection Limit
* / (Non-NELAP): NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.

Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.

Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.

Approval
cc:

Alexis Nicole Harold For Cindy A. Waddell
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
369
Client Name:

Report Date:

PERC Water Corp
19101 Jonathan St.

Dave Kachelski
Adelanto, CA 92301
Contact:

Address: Project Number:

Analytical Report: Page 10 of 10
Project Name:
17-Nov-2023
Work Order Number: C3J3719
Received on Ice (Y/N): Yes Temp: °C 2
PERC - Weekly WW
Adelanto WWTP
C3J3719
mailing
P.O. Box 432
Riverside, CA 92502-0432
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
370
Section H
CIP Report
371
Project # Estimated
Cost
Project
start
date
$'s spent
to date
Scope Comments Status
1 $150,000 21-22
Upgrade cleanouts to
manholes for
maintenance access.

There are several cleanouts in
Joshua Estates that can't be
maintained. Convert to manholes
for cleaning maintenance
waiting for budget
approval
2 $400,000 21-22
Purchase CCTV Van for
locating and raising
buried Manholes.

There are many manholes that are
below ground surface for >20 years.

Locate & raise to grade. Cannot
perform maintenance of sewer
lines.

Obtained bids
3 $50,000 20-21 Muskrat sewer lift
Station.
install radio communcation and
ancillary equipment to allow data
to existing WWTP SCADA system.

Includes programming, parts and
alarm notifications.

Obtained bids
4 $200,000 Ponds 2 & 3
Pond 2 & 3 rehabilitation to
emergency bypass ponds pursuant
to 2013 Application for Waste
Discharge.

Not started
5 ? 22-23 Install Auburn & 395
parallel sewer main
Install parallel sewer main on
Auburn under Hwy 395. to relieve
surcharged sewer condition
observed .

Engineering is designing
6 $1,800,000 22-23 Expand WWTP to 3.7
MGD. Budget 2023-24
Install 5th influent pump, 4th turbo
blower, replace DO probes, install
NO3 probes, add polymer at sec
clarifier, upgrade water system.

WWTP at 3.0 MGD Ave daily flow.

PACE completed
capacity assesment.

Waiting for design
budget approval
7 $300,000 22-23
Upgrade current filters
contact tank to make
Title 22 water for reuse
on parks, etc.

Equipment onsite, but some
replacement equipment needed,
and new analyzers, safety upgrades
along with SCADA tie ins and title
22 eng report.

Not started, city
obtaining grant funding
8 ? 21-22 Install purple pipe from
WWTP to parks
Install purple pipe, 0.75 mile. Need
engineering to design.

Not started, city
obtaining grant funding
Adelanto Wastewater CIP 2023-24
372
$1,500,000 2/1/22 ? Increase Sewer Main Capacity
carryover from 2019-20
Install parallel sewer main on Pairmain St. to relieve surcharged sewer condition observed on Jonathan St. sewer main.

COMPLETED
$750,000.00 9/1/21 $749,995.00
WWTP Dewatering System
carryover from 2018-19

1. Engineer, purchase, install new centrifuge. Demo of old unit.

Original centrifuge not sized for increased flows and nonoperational

2. Rezise existing sludge feed pump and polymer feed unit.

3. Repair existing grinder/macerator ("muffin monster"). COMPLETED $5,000.00 $5,423.41 "Smart covers" # 6 manhole level and flow monitoring sensing device.

Additional smart cover for lift station manhole to prevents sewer spills and vandalism spills. 10 years with battery replacement every two years

RECEIVED

COMPLETED
$11,000.00 $10,846.82 "Smart covers" # 4 & 5 manhole level and flow monitoring sensing device.

Additional smart cover for lift station manhole to prevents sewer spills and vandalism spills. 10 years with battery replacement every two years

RECEIVED

COMPLETED
$11,000.00 10/15/21 $10,416.82 "Smart covers" # 2 & 3 manhole level and flow monitoring sensing device.

Surcharged manholes at trunck sewer at Auburn/Bellflower. 10 years with battery replacement every two years

RECEIVED

COMPLETED
$5,000.00 2/20/20 $4,743.32 "Smart covers" # 1 manhole level and flow monitoring sensing device.

Surcharged manhole at trunck sewer at Jonathan/Bartlett. 10 years with battery replacement every two years

RECEIVED

COMPLETED
$50,000.00 8/1/20 $48,000.00
Influent Lift Station Pump
carryover from 2019-20
Reconfigure Influent lift station pump control wiring. Wires were cut during bypass of influent to VVWRA. Pump currently has no operational signals. System could overflow or pump could overheat. Reconfigure Influent lift station pump control logic for interlocked operation with other pumps on new SCADA. COMPLETED $75,400.00 Manhole (4) Rehabilitation
carryover from 2019-20
Deteriorated manholes at Aster & Vintage require urgent replacement. Includes bypass pumping. COMPLETED
$55,500 7/1/22 $51,500 Remove GE SCADA PLC. Budgeted 2021-22 GE SCADA PLC from blower installed in 1998. GE interferes at times with newer SCADA PLC hardware COMPLETED
Adelanto Wastewater Completed CIP 2023-24
10/20/2023
373

CITY COUNCIL AGENDA REPORT
DATE: December 13, 2023
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
BY: Todd Litfin, City Attorney
SUBJECT: APPROVAL OF FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT

WITH POTOMAC PARTNERS DC FOR FEDERAL LOBBYING SERVICES
STAFF RECOMMENDATION:

Staff recommends that City Council consider and approve the First Amendment to Professional Services Agreement with Potomac Partners DC for federal lobbying services.

BACKGROUND:

On July 1, 2023, the City and Potomac Partners DC for federal lobbying services. The contract was in the amount of $30,000 and covered four months of services at $7,500 per month. The City has been pleased by the services provided by Potomac Partners and desires to extend the contract for an additional 12 months from November 1, 2023, to October 31, 2024. Specifically, the work will focus on federal issues pertaining to the APUA’s water and sewer facilities and potential funding for improvements thereto. Hence, the APUA is being added as a party to the agreement.

FISCAL IMPACT:

At $7,500 per month, the maximum additional cost is $90,000. The City and APUA can terminate the agreement at any time upon notice to Potomac Partners and would only be responsible for payments up until the time of termination. Since the proposed work is intended to focus on water and sewer improvements, the funding will come from the APUA unless work is for other specific City issues.

ATTACHMENTS:
1) 2023 Professional Services Agreement with Potomac Partners DC dated July 1, 2023 2) First Amended Professional Services Agreement
374
First Amendment to PROFESSIONAL SERVICES AGREEMENT
(Engagement: As-Needed Intergovernmental Consulting Services) (Parties: Potomac Partners DC, City of Adelanto, Adelanto Public Utility Authority) This First Amendment to Professional Services Contract (“Amended Contract”) is dated November 1, 2023, between the City of Adelanto (“CITY”), Potomac Partners DC (“CONSULTANT”), and the Adelanto Public Utility Authority (“APUA”). CITY, CONSULTANT, and AUPA are collectively referred to as the “Parties.” CITY and CONSULTANT previously entered into a Professional Services Contract [Intergovernmental Consulting Services] dated July 1, 2023 (“Contract”). To the extent applicable, the term “CITY” in the Agreement shall include both CITY and APUA. The Parties hereby mutually agree and promise as follows:

I. Section 1.1 of the Contract is amended to read as follows:

TERM: This Agreement shall have a term commencing from November 1, 2023 through October 31, 2024 (hereinafter, the “Term”). Nothing in this Section shall operate to prohibit or otherwise restrict the CITY’s or APUA’s ability to terminate this Agreement at any time for convenience or for cause as provided under Article V (Termination) of the Contract.

II. Section 1.4 of the Contract is amended to read as follows:

COMPENSATION: CONSULTANT shall perform the Work in accordance with “Potomac Partners DC-Scope of Work” (hereinafter, the “COMPENSATION RATE”) attached and incorporated hereto as Exhibit “A”. The foregoing notwithstanding, CONSULTANT’S total compensation, for the performance of all Work contemplated under this Agreement, will not exceed the total budgeted sum of One Hundred Twenty Thousand Dollars ($120,000) (hereinafter, the “Notto-Exceed Sum”) during the Term of this Agreement which includes an increase of Ninety Thousand Dollars ($90,000) in this First Amendment, unless such added expenditure is first approved by the City Council for the CITY, and the APUA. In the event CONSULTANT’s charges are projected to exceed the Annual Not-to-Exceed Sum prior to the expiration of this Agreement, CITY may suspend CONSULTANT’s performance pending CITY approval of any anticipated expenditures in excess of the Not-to-Exceed Sum or any other CITY approved amendment to the compensation terms of this Agreement.

III. Section 1.5 of the Contract is amended to read as follows:

PAYMENT OF COMPENSATION: No later than the 7th day of each calendar month, CONSULTANT shall submit to CITY and APUA an itemized invoice indicating the services performed and tasks completed during the recently concluded calendar month, including services and tasks performed and the 375
reimbursable out-of-pocket expenses incurred. If the amount of CONSULTANT’s compensation is a function of hours worked by CONSULTANT’s personnel, the invoice should indicate the number of hours worked, the persons responsible for performing the Work, the rate of compensation at which such services and tasks were performed, the subtotal for each task and service performed and a grand total for all services performed.

Within thirty (30) calendar days of receipt of each invoice, CITY or APUA will notify CONSULTANT in writing of any disputed amounts included in the invoice. Within forty-five (45) calendar days of receipt of each invoice, APUA will pay all undisputed amounts included in the invoice. CITY and APUA will not withhold applicable taxes or other authorized deductions from payments made to CONSULTANT.

IV. Section 6.4 shall be amended to read as follows:

NOTICES: All notices permitted or required under this Agreement will be given to the respective Parties at the following addresses, or at such other address as the respective Parties may provide in writing for this purpose:

CONSULTANT:

Potomac Partners DC
700 Penn, DE
Washington, DC 20003
Attn: Dan Feliz
Phone: (202) 544-4848
CITY:

City of Adelanto
11600 Air Expressway
Adelanto, CA 92301
Attn: Brenda Lopez,
City Clerk
Phone: (760) 246-2300
APUA:

Adelanto Public Utility
Authority
11600 Air Expressway
Adelanto, CA 92301
Attn: Jessie Flores
Phone: (76) 246-2300
V. Exhibit A is amended to include the following language: “The scope of work will include work on water and sewer infrastructure projects.” VI. All other terms of the Contract shall remain unchanged and continue in full force and effect.
(SIGNATURES ON NEXT PAGE)
376
IN WITNESS THEREOF, the Parties hereto have executed this Amended Contract on the date indicated above.

POTOMAC PARTNERS DC:

By:_______________________
Name:_____________________
Title:______________________
Date:______________________
CITY OF ADELANTO:

By:_______________________
Name:_____________________
Title:______________________
Date:______________________

ADELANTO PUBLIC UTILITY

AUTHORITY
By:_______________________
Name:_____________________
Title:______________________
Date:______________________

APPROVED AS TO FORM
By:________________________
Todd O. Litfin, City Attorney
ATTEST
By:________________________
City Clerk
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395

POTOMAC PARTNERS DC
Potomac Partners DC  700 PENN, SE Washington DC 202-544-4848 April 25, 2023
The City of Adelanto
Attn: City Manager
11600 Air Expressway
Adelanto, CA 92301
Dear Mr. Flores:

Tight budgets, unforeseen policy dilemmas, and tumultuous politics translate to a precarious time for municipal governments post pandemic. Your mission to deliver a consistent level of services to your constituents often depends on federal financial involvement. To address the myriad of political and policy challenges, sometimes you need a new and innovative approach to your federal legislative advocacy program. Please find attached to this letter information about our firm, the principals that will be involved in this effort, and that innovative approach that we will tailor to your objectives.

Why Potomac Partners DC? Because we get results. At this firm, we believe you always put the client’s needs and desires first, and you add value to every decision the client seeks to make. We have three core approaches:
1) PPDC actively researches the client’s needs and interprets the client’s real concerns.
2) PPDC adds significant value-- on time and within the budget constraints. 3) PPDC delivers on its commitment with verification of service. Count on us for uninterrupted service and information.

We are confident that our boutique firm structure, core values, and strategic approach can provide you a platform to achieve your federal advocacy objectives. With us the City of Adelanto can count on a clear set of goals with the commitment to deliver.

PPDC always verifies and never makes assumptions. Furthermore, we specialize in building a tailored federal legislative strategy to fund with some federal dollars the important infrastructure and other municipal projects such as the improvement of your wastewater infrastructure. We are also experts in the legislative process, and we will use that knowledge and experience to pinpoint the political geometry to impact the policy and funding priorities for Adelanto.

As a boutique firm, you would have all the members of the firm working on your behalf without delegation to junior inexperienced associates that is common in the megalobbying/law firms with large overhead costs. That’s why most clients of these big firms only see or talk to the marquee or “named” partners during the sales pitch—not when you need your issues solved or some timely advice. The bottom line is: We won’t offer you 396
2 cookie-cutter advocacy looking to incrementally address your issue while spreading limited attention across too many clients. We will stay responsive to your issue dynamics, provide the persistent presence you need on Capitol Hill, and stay focused on the desired result without any conflicts of interest. Another PPDC advantage is our bi-partisan relationships with senior congressional members on the committees and Agency officials of importance to your policy and funding priorities.

On behalf of Potomac Partners DC, we would be privileged to represent the City of Adelanto in Washington D.C. We believe PPDC is the best choice to provide you with federal representation to facilitate the successful implementation of your federal policy goals. We look forward to the opportunity to serve you.

Sincerely,
Dan Feliz
Potomac Partners DC
397
3 ABOUT THE FIRM
Potomac Partners DC (PPDC) is a boutique government relations firm located on Capitol Hill blocks from the Capitol complex. That proximity to the federal policy makers is a primary requirement for an effective federal advocate. You simply can’t lobby Congress or the Administration when you don’t live and work here. The principals at PPDC also have the right relationships with the key policy makers and the right business model to suit your city’s federal advocacy needs and the changing political dynamics at the federal level.

From the early beginnings of the firm in 2005, Rick Alcalde, President and founder, set out to provide personalized and strategic consulting services to clients seeking positive policy outcomes and federal funding. Mr. Alcalde was an industry leader in envisioning a new generation of nimble government advocates who understand the changing business of influencing Congress and the federal bureaucracies, and can easily morph into high-level, team-oriented advisors for clients. To that end we developed three core values at the firm:

Service with Verification, Value Added with Solutions for your Real Needs, Persistent and Uninterrupted Communication. A final core value that isn’t just an afterthought is honor and integrity. We walk what we talk, live what we believe, without compromise, whatever the consequence.

While honing these core values over the years, we have developed a particular specialty in representing municipal governments. We believe the City of Adelanto could greatly benefit from our team of specialized political strategists in achieving your desired federal objectives.

Our personal approach sets us apart from other lobbying firms. Our number one goal has always been to care more and work harder for our clients. Consequently, we rarely lose clients and we have developed a unique team atmosphere where each member of the firm who is a dedicated and seasoned professional can be interchangeable and effective on your behalf. We are always reachable, and when clients call, we are on duty day or night.

As a boutique firm, we are selective in our client base, and we limit the number of clients we represent in any state or region to avoid conflicts of interest, and to limit the number of requests we present to legislators and key policy makers to achieve the maximum results.

We focus on doing good work, and we never prioritize growing our business with new clients at our current clients’ expense. To date, this approach has worked for us, and we can point to our success being built on our ability to understand our clients and develop a unique and individualized strategy that considers the current legislative and political environment.

Whether advocating new policy or developing new funding, we will always take your message directly to the policymakers and advance solutions that deliver the desired result.

Furthermore, the proximity of our office to the policymakers is not only convenient for A Personal Approach
398
4 meetings with Members, but also integral to our advocacy approach that is persistent, personal, and hands-on. We regularly host receptions, luncheons, and other political events at our office to enhance our rapport with senior policy makers and their staff, which inures to the benefit of our clients.

We have long served major municipalities and transportation authorities in Southern California like San Bernardino County and Orange County Transportation Authority and others. Our knowledge of Southern California coupled with our relationships in Washington D.C. will help deliver success at the federal level for the City of Adelanto.

Perhaps the most sought-after commodity we provide is our ability to develop tailored legislative strategy and innovative policy proposals that give you the optimal opportunity to shape federal policy and funding opportunities. Consider this, the City of Adelanto is one of thousands of municipal entities competing for the same federal resources. How do you make the case for prioritizing your needs and who in Congress can help set those priorities? The answer to the later question is usually the Chairmen of the key Committees.

To that end, we maintain regular relationships with those key Members of Congress, their congressional staff, and agency officials to help build upon your network of allies to achieve your federal policy objectives. But again, the answer to being competitive with all those other needy cities-- it takes a focused and tailored strategy.

This effective advocacy often requires the combination of proactive approaches to achieve objectives and effective reactions to legislative and administrative proposals. PPDC will work closely with the City of Adelanto to develop the right message and strategic approach to position the effort in a proactive manner to secure the desired results. Additionally, we remain watchful for potentially negative federal proposals. As always, we not only take your message to the policymakers, but we are able to work with coalitions and other industry groups on the effort.

In summary, PPDC seeks to provide personal service, custom strategies, and exceptional results for the City of Adelanto. We will stay responsive to your issue dynamics, provide the persistent presence you need on Capitol Hill, and stay focused on the desired result without being encumbered by conflicts of interest.

Below is additional background information about the principles, and a basic outline of the ways we believe we can impact for the city and the region as well as a few details on the scope of work that we would use to get started and further develop an innovative and tailored legislative advocacy plan.

A Tailored Legislative Strategy
399
5 PPDC TEAM
Each of our partners will bring an important skill set and close relationships with elected and appointed officials that will help you implement an effective legislative strategy and successfully communicate your objective to federal leaders in Washington, D.C.

Rick Alcalde – President
Mr. Alcalde is the founder and President of Potomac Partners DC. Mr. Alcalde worked at several prestigious firms, including Alcalde and Fay, and the highly respected Federalist Group. In order to provide clients a more personalized level of service, in contrast to what is typically offered at larger firms, Mr. Alcalde founded Potomac Partners DC, where he brought together a small group of senior legislative and government affairs professionals with access to several high-profile strategic partners. Mr. Alcalde himself has over 30 years of experience advocating on behalf of municipal government entities before Congress and the Administration. Mr. Alcalde has distinguished himself with lawmakers on Capitol Hill and with numerous clients for his exceptional ability to develop winning legislative strategies and accomplish unusual funding and policy objectives in Congress.

Mr. Alcalde is a graduate of Florida State University. He earned his J.D. from the South Texas College of Law and is admitted to the District of Columbia Bar and the Pennsylvania Bar.

Dan Feliz – Managing Partner
Mr. Feliz is an experienced legislative and administrative strategist. Over the last decade with PPDC, he has served numerous private and municipal clients on issues of transportation, energy, defense, and appropriations issues. He has helped clients like the Housing Authority of the County of San Bernardino County envision and implement a new program to solve the region growing homelessness crisis and ensure no child is left unsheltered. He has worked on solving difficult policy dilemmas like outdated bus axel weight requirements that can hinder a city’s ability to provide bus service or ensure the approval of federal right of way rights for utilities to service a local development-- and many issues over the years. But regardless of the issue, small or big, he looks to provide solutions to the real underlying need.

Mr. Feliz is a Naval Academy graduate, and an alumni of Harvard’s Kennedy School of Government. He is also a nuclear engineer who served aboard nuclear ballistic missile submarines. Other past military assignments include serving at the Naval Research Laboratory, teaching at the United States Naval Academy, and working with the Navy’s Legislative Affairs Office. During his time in the Navy he was often tasked with synthesizing complex issues into executive summaries for Members of Congress to help make the case for Navy programs at risk for defense cuts. Because of his military service, Mr. Feliz remains a trusted advisor to several Members of Congress on defense issues and he is the Board Chairman of the Association of the US Navy. 400
6 Adam B. Cross
Adam Cross is a seasoned advocate and policy expert that has built close relationships with senior staff and Members on the House Transportation and Infrastructure, Foreign Affairs, Appropriations, Ways and Means, and Homeland Security Committees as well as the Senate Commerce, Banking, EPW Committees, House Armed Services, and Foreign Affairs Committees. Adam Cross is also highly experienced in emerging transportation policy issues, grant funding processes and opportunities, and strategic policy planning. Mr.

Cross has developed significant contacts in the White House and the Departments of Transportation, Justice, Homeland Security, Health and Human Services, Agriculture, and Housing and Urban Development. Mr. Cross is also an expert at the annual appropriations process and is responsible for helping organize, prepare, and submit Community Project Funding/Congressional Directed Spending request for clients. Furthermore, he is also an expert at identifying federal funding opportunities for clients. He has used his knowledge and experience in the federal funding realm to help secure hundreds of millions of dollars for clients in the last five years through the grant process, the annual appropriations process including $100 million in the last two years alone through the new and evolving Congressional “earmarking” process.

Anthony Sola
Anthony Sola is a graduate from the University of Miami with a B.A. in Public Relations.

He was born and raised in Panama City, Panama. He began his career in the Administration as a communications specialist for the Organization of American States (OAS) serving directly under the Secretary General. After a successful tour at OAS, he worked in politics as a field organizer in Florida for a Presidential campaign. After serving in government and politics, he added private sector experience working as an analyst for a healthcare company that provided covid testing and medical triage support during the coronavirus pandemic.

In 2021 Mr. Sola started with PPDC as a legislative assistant and is responsible for policy and legislative analysis. During this time, he has helped refine our firm methods for identifying and tracking new legislation, federal notices, amendments, and more to help our clients better understand the legislative landscape and the often-overlooked nuances of federal legislative activity.
401
7 OUR APPROACH TO YOUR ADVOCACY
The issue areas that we would propose to engage for the city cover a range of sectors, including transportation, water infrastructure, housing, energy, and defense infrastructure funding. We will establish strategic objectives and leverage existing relationships with federal policymakers to successfully advocate for the City of Adelanto’s federal policy goals. We will provide the strategic roadmap for Congress and work collaboratively with you and other advocates to develop the appropriate message that translates to the political inertia necessary for success that is well defined.

A primary challenge for 2023-24 is working around what may be a legislatively dysfunctional year based on the partisan politics of the upcoming 2024 elections. We already saw the height of this legislative paralysis in 2020 when Congress delayed making major funding and policy decisions eventually leading to the last omnibus spending bill that did not address the debt ceiling. Other contentious issues such spending reductions and work requirements, and the need to address an increase in the debt ceiling will intensify the partisanship and impacted the progress of passing major legislation as well as the annual spending bills.

We can show you how to advance your federal advocacy program with an innovative strategy, and some key milestones over the next couple of months. As far as a quick summary of that strategy, the solution in this political environment is developing the right message and building the right relationships with key policy makers. We will help you stay focused on a consistent message and develop strategic support for responsible government spending that helps provide our Congressional champions with the information they need to complete major infrastructure legislation such as the Water Resources Development Act, National Defense Authorization, and of course the appropriations bills. A good example of this was the $34M list of earmarks we currently have for San Bernardino County.

Advocates with Strategic Relationships
The Challenge
402
8 As mentioned above, we see the opportunity for Adelanto in three main areas:

Transportation/Infrastructure, Defense (Plume Clean-up to be used as catalyst for wastewater plant improvement), and Natural Resources. Our decades of experience and expertise with public sector clients, our first-class personal service, and our strong bipartisan working relationships with leaders of the key congressional committees underscore our ability to deliver for the city. Our entire team is familiar with the Inland Empire and the High Desert, and we are ready to help refine and refocus the approach on these three issue areas.

Transportation/Infrastructure: We will help you target new funding opportunities for infrastructure in the city. Our strength is working with the Chairmen and Ranking Members of the House Transportation & Infrastructure, Senate Environment and Public Works, Banking Housing and Urban Affairs, and Commerce, Science and Transportation Committee to shape and influence the primary legislative vehicles that fund transportation and water infrastructure. It is important to note that President Biden and his Federal Departments have prioritized equity, inclusion, and climate change. These priorities can often disadvantage rural areas and highway projects in the discretionary grant process. As funding becomes available through grants, formula funding, and Congressional Directed Spending/Community Project Funding (which are basically earmarked grants), we will advise the city on how equity, inclusion, and climate change considerations will affect available grant funding opportunities and how to strengthen our requests especially with Republican congressional offices that would seek to counterbalance the Department of Transportation’s funding recommendations. We will also help you better target key transportation infrastructure funding by highlighting the additional benefits that funding has for the five military installations and our national security.

Our firm has represented many clients in the transportation sector, including seaports, airports, transportation authorities, passenger rail, builders, and other private entities seeking to invest in large-scale infrastructure projects. We have built a strong network of relationships among the staff and Members of the House Transportation & Infrastructure Committee and the various Senate Committees mentioned above. We have helped clients secure Transportation Infrastructure Finance and Innovation Act (TIFIA) loans through the Build America Bureau, Capital Investment Grants (CIG) for streetcar projects and light rail connectors, and congressional appropriations for highway expansions and express lanes despite some of the challenging dynamics at U.S. Department of Transportation, which does not currently prefer to advance major highway projects.

To re-emphasize, what makes us potent in the transportation policy arena are the numerous long-standing relationships we have with key Congressional transportation leaders that serve as Chairmen and Ranking Members of the appropriations and authorizing committees with jurisdiction over federal funding and transportation policy. We have been working with Chairman Sam Graves (R-MO) and his staff for over a decade and regularly provide policy advice during the drafting stages of transportation legislation.

The Opportunity
403
9 Once you have identified a specific funding need, we will quickly engage with the following actions:
• PPDC will meet with officials and staff at the federal agencies to identify upcoming opportunities for the City of Adelanto.
• PPDC will work with your congressional delegation to build congressional support for grant applications through support letters and congressional follow-up. • PPDC will monitor the appropriations process for new programs that could be eligible for Community Project Funding/Congressional Directed Spending accounts and immediately report any changes to the City. We will also identify and advocate as need for other similar earmark requests in other authorizing legislation such as the Water Resources Development Act.
• PPDC will continue to monitor new legislation, amendments, rules, or policies that would help or hinder your grant applications and communicate these developments to you in our regular updates and reports.

Defense: Defense policy is another core practice area for Potomac Partners. Dan Feliz is a Navy veteran and is active in defense policy as the Board Chairman of the Association of the United States Navy. Adam Cross worked in the office of Congressman Valadao (RCA), now a senior member of the Military Construction, Veteran Affairs, and Related Agencies Appropriations subcommittee. Rick Alcalde has a strong relationship with Rep.

Ken Calvert (R-CA), Senator Roger Wicker (R-MS), and Rep. Mike Rogers (R-AL). Many of Senator Wicker’s senior staff have been longtime colleagues who we have closely worked with during their careers on and off the Hill. Both Sen Wicker and Rep. Rogers will be collaborating this session on the next National Defense Authorization Act (NDAA), which sets the annual budget and policies for the Department of Defense. • We will help the city develop a strategy to attract as much defense appropriations funding for potential improvements to/relocation of the city’s wastewater plant to prevent Plume buildup underneath GAFB. We will work directly with the Chairman and Ranking Member of the Defense Appropriations subcommittee and the House and Senate Armed Services Committees on this issue.

Natural Resources and Native American Affairs: Our relationships with the Congressional leaders and the House Natural Resources and Senate Energy and Natural Resource provide enhanced opportunities to help the region secure wildfire and emergency management infrastructure funding. Additionally, our team has been involved in developing air & water quality and flood control policy and legislation. We have facilitated dozens of meetings between locally elected officials and policymakers on this issue at the Bureau of Indian Affairs, Department of Agriculture, EPA, and U.S. Forest Service. Part of our approach to your funding needs will be leveraging our experience and relationships with key players to identify new federal funding at a variety of agencies with innovative partnerships.
• During the drafting of the Infrastructure Investment and Jobs Act (IIJA), we worked closely with House and Senate leaders such as Congressman Pete Aguilar (D-CA) 404
10 to ensure the inclusion of wildfire funding and streamlined policies that address wildfire response, suppression, and recovery were included in the final package.

Another specific provision included $490M for hazardous wildland fuels reduction in western states. We have worked on every issue related to wildland fire management, especially relating to fires on federal lands that threaten public infrastructure and private property. We believe that Congress will continue to recognize the need to increase healthy forest management to prevent wildfires.

Wildfires continue to be one of the most significant contributors to greenhouse gas emissions (a known emphasis for the Biden Administration). We also believe that the House Republicans will pursue legislation that links healthy forest management practices and water conservation efforts.
• As it relates to funding success for flood protection and water management projects in both the authorizing and appropriations legislation, we advocated for the Santa Ana River Mainstem project in California, ultimately securing a total of $275 million for the project over three years. To achieve this goal, we delivered exceptional access through in-person meetings with the US Army Corps of Engineers headquarters, the White House Office of Management and Budget (OMB), and top policymakers working on water infrastructure issues.

Frequent updates and focused analysis on Federal legislation, funding, and regulations: To ensure that you remain aware of legislative activity for the City, we will evaluate and provide focused reports on pending legislation, proposed regulations, and emerging issues that are relevant to your legislative platform. Part of our approach will be a tailored strategy memo that details next steps, highlights relevant committees and federal officials that would be the most important influencers on the issue, and provides a recommendation on timing for meeting with those officials.

We will also work with the City to identify priority funding needs and projects that could be eligible for Community Project Funding/Congressionally Directed Spending (CDS/CPF). In the last two years, we have secured CDS/CPF funding in nearly every account the House and Senate offers. Once we help identify eligible projects in the City, we will work with the Congressional delegation and Appropriators to ensure that our request meets all process requirements for successful inclusion. A sample list of other funding line items we helped facilitate for clients are as follows:
• $10,000,000 – San Bernardino County Transportation Authority: Replacement of Central Avenue Bridge.
• $10,000,000 – San Bernardino County Transportation Authority: Zero-Emission Passenger Rail vehicle.
• $5,000,000 – San Bernardino County: Reduce congestion and expand regional connectivity, Pine Ave.
• $1,000,000 – San Bernardino County: Purchase & install Electric Vehicle charging stations at Chino Airport.
• $1,000,000 – San Bernardino County International Airport runway repairs. • $1,000,000 – San Bernardino County: traffic flow technology improvements. 405
11 • $1,000,000 – San Bernardino County: US Army Corps of Engineers, Water Conservation.
• $565,000 – San Bernardino County: City of Chino fire risk mitigation and fuel reduction.
• $950,000 – San Bernardino County: City of Rialto Emergency Operations Center. • $4,400,000 – Metrolink: Parking Structure Project and new Metrolink commuter train station.
• $3,000,000 – Metrolink: Add a second train platform \ and lengthen the existing train platform.
• $1,585,000 – National 9/11 Memorial and Museum: Capital project and infrastructure funding.
• $750,000 – Orange County Transportation Authority: High-capacity transit study. • $328,886 – Housing Authority of Salt Lake City: Human Rights Housing Project. • $3,000,000 – Housing Authority of County of San Bernardino: Community Resource Center.
• $350,000 – Town of Longboat Key, FL: Flood Mitigation and Habitat protection. 406
12 The section below provides a preliminary Scope of Work PPDC would perform to achieve the City of Adelanto’s federal objectives:

1. Legislative Strategy Development and Implementation

1.1 Work with the City of Adelanto to identify the key policy and funding priorities ahead of the legislative cycle.

1.2 Provide the City of Adelanto a roadmap for engaging in the federal policy and funding process to achieve these priorities.

1.3 Develop targeted strategies for engagement with Congress and the Administration based on the legislative strategy.

1.4 Develop targeted and informed messages to engage key Congressional Members and the Administration on each of the City’s priorities.

1.5 Monitor for any federal legislative of regulatory developments that may impact the legislative strategy.

1.6 Continually advise and sculpt the strategy to address any new opportunities or obstacles.

2. Relationship Management for the City

2.1 Enhance the visibility of the City of Adelanto’s Federal needs by engaging a targeted group of Members of Congress, Congressional Staff, and Agency Officials most impactful to your priorities.

2.2 Coordinate the introduction of legislation sponsored or supported by the City of Adelanto with Members of the City’s congressional delegation and key committee Members.

2.3 Facilitate meetings and discussions with Members of key authorizing and appropriations committees of jurisdiction, and key policy staff in Congress and at the Agencies.

2.4 Utilize these relationships to build support with members outside the delegation for enactment, passage, and signing into law of legislation supported by the city.

Getting Started with a Scope of Work
407
13 3. Project Communication

3.1 Designate a project manager (Dan Feliz) the city can consistently communicate with on the progress and evolution of the legislative strategy.

The projected manager will also keep the city well informed of any relevant Congressional and Administrative actions.

3.2 Provide regular written reports and briefings to the city on upcoming and ongoing Congressional and Administrative actions that impact the City’s legislative priorities in advance and as they evolve.

3.3 Provide the City prompt communication regarding actions that impact the legislative strategy and federal events that may impact the city through phone and email communication.

3.4 Travel to the City of Adelanto to brief City officials on the federal legislative cycle and the implementation of the City’s legislative strategy as requested.

4. Project Management and Resources

4.1 Prepare briefing materials, provide briefings, and arrange appointments for City officials and staff when they travel to Washington D.C. in furtherance of the City’s legislative strategy.

4.2 Provide a fully functional guest office to visiting City officials. This guest office has a work area, phone, scanner/copier/fax, email access, and temporary storage.
408
14 FEE STRUCTURE
We understand that City budgets are tight, so we would propose a monthly retainer at a discount at what you are currently budgeting. At $7,500 per month, we will deliver the level of service you require as well as a significant augmentation of innovative strategies and relationships with policy makers outside of your delegation. 409

SUCCESSOR AGENCY BOARD REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: December 13, 2023
TO: Honorable Chairman and Board Members
FROM: Jesse Flores, Executive Director
BY: Finance
SUBJECT: RECOGNIZED OBLIGATION PAYMENT SCHEDULE (“ROPS”) 24-25 FOR JULY 1, 2024 THROUGH JUNE 30, 2025
STAFF RECOMMENDATION:

Staff recommends the Successor Agency Board approve Resolution 24-01, approving and adopting the Recognized Obligation Payment Schedule for the period of July 1, 2024 to June 30, 2025 (ROPS 24-25).

BACKGROUND:

California Health & Safety Code (HSC) section 34177 requires the San Bernardino Countywide Oversight Board (CWOB) to approve the 2024-25 Recognized Obligation Payment Schedule (ROPS) and administrative budget. The ROPS is an annual form and must be submitted to the Department of Finance (DOF) and the County Auditor-Controller by February 1 of each year. Pursuant to HSC section 34179(h)(1)(B), the administrative budget is not required to be sent to DOF.

DOF will have until April 15 to review the 2024-25 ROPS and provide the successor agency a compliance determination. If the successor agency disagrees with the DOF determination, a “meet and confer” is allowed to facilitate a discussion between the successor agency and DOF. In the event of a meet and confer process, DOF must make a final compliance determination on or before May 15 or 15 days prior to the June 1 Redevelopment Property Tax Trust Fund (RPTTF) distribution.

The recommended action will further the Successor Agency to the Redevelopment Agency of the City of Adelanto’s (Successor Agency) dissolution as an annual ROPS is required by DOF as part of the winddown of the Successor Agency. There is a decrease of $845,887 requested in the non-administrative cost allowance amount required from the RPTTF from the last annual ROPS approved, resulting primarily from the payoff of the bonds listed in ROPS Detail Item 1 during the ROPS 23-24 period. Changes to the amounts requested for remaining debt service for the Successor Agency’s bonds reflect amounts required to pay debt service pursuant to the amortization schedule for each of the bonds.

The ROPS Detail includes Item 31, Excess Bond Proceeds. The Successor Agency has been holding bond proceeds from the Adelanto Improvement Agency 2007 Tax Allocation Bonds (2007 Bonds) since its formation. The Successor Agency’s 2013 Other Funds Due Diligence review reported that in 2013, the 410
Successor Agency had unspent bond proceeds of $3,056,314 transferred from the 2007 Tax Allocation Bond cash with fiscal agent to cash in bank in Fund 555, RDA Capital Project Funds, in FYE 07-08. The Successor Agency has determined the amount of unspent bond proceeds currently held by the Successor Agency, including interest on the original proceeds from principal received, is $3,139,426.

The Successor Agency received a Finding of Completion on October 3, 2013. As a result, pursuant to HSC section 34191.4(c)(1)(A), bond proceeds derived from bonds issued on or before December 31, 2010, may be expended in a manner consistent with the original bond covenants. The Successor Agency has submitted a separate agenda item request6ing approval to enter into a Bond Proceeds Expenditure Agreement with the City of Adelanto for the expenditure of the excess bond proceeds. Expenditure of the full amount of Excess Bond Proceeds (principal and interest) is requested to be transferred to the City during the ROPS 24-25A period on the ROPS Detail, Item 31.

The Successor Agency has decreased its request for Administrative Costs from RPTTF from $250,000 in the ROPS 23-24 period to $149,445, a decrease of $100,555 or approximately 40%. The decrease results primarily from the engagement by the Successor Agency of outside accountants, counsel and other consultants in an effort to address the final matters needed to prepare a Last & Final ROPS. The engagement of such consultants is anticipated to reduce the amount of time spent by Successor Agency and City staff on Successor Agency matters. Additionally, the Successor Agency has transferred or is in the process of obtaining approval to transfer its remaining real property in accordance with the Dissolution Law, and the majority of the costs of doing so will be incurred prior to the ROPS 24-25 period.

FISCAL IMPACT:

Expenditures from Redevelopment Property Tax Trust Fund (“RPTTF”) of $7,963,979, administrative allowance from RPTTF of $149,445, $3,139,426 Bond proceeds $3,893,200 RPTTF, and $781,908 from Reserves for a total expenditure of $7,963,979
ATTACHMENTS:

1. Successor Agency Board Resolution 23-06

2. Exhibit ‘A’ – ROPS 24-25
411
SUCCESSOR AGENCY RESOLUTION NO. 23-06

A RESOLUTION OF THE BOARD FOR THE SUCCESOR AGENCY TO THE FORMER

ADELANTO REDEVELOPMENT AGENCY APPROVING AND ADOPTING THE RECOGNIZED OBLIGATION PAYMENT SCHEDULE FOR THE PERIOD OF JULY 1, 2024 TO JUNE 30, 2025 (ROPS 24-25)
WHEREAS, on December 29, 2011, the California Supreme Court delivered its decision in California Redevelopment Association v. Matosantos (“Matosantos”), finding ABx1 26 (“Dissolution Act”) largely constitutional,
WHEREAS, under the Dissolution Act and the decision made in Matosantos, all California redevelopment agencies, including the Adelanto Redevelopment Agency (“former Agency”), were dissolved on February 1, 2012,
WHEREAS, California Health and Safety Code Section 34177 provides that before each twelve month fiscal period, successor agencies to former redevelopment agencies, including the Successor Agency to the Former Adelanto Redevelopment Agency (“Successor Agency”), must prepare, approve, and submit to the Oversight Board overseeing each successor agency a Recognized Obligation Payment Schedule (“ROPS”) for the enforceable obligations of each former redevelopment agency,
WHEREAS, the next twelve month period for which a ROPS is required is the period commencing on July 1, 2024 and ending on June 30, 2025, WHEREAS, the Successor Agency desires to adopt this Resolution approving adopting the ROPS for the above-stated period (“ROPS 24-25”),
WHEREAS, upon execution by the City Council of the City and Board of the Successor Agency, ROPS 23-24 will be submitted to the Oversight Board for approval, and WHEREAS, following approval by the Oversight Board, ROPS 24-25 will be submitted to the California Department of Finance for approval.

NOW, THEREFORE, THE BOARD OF THE SUCCESSOR AGENCY TO THE

FORMER ADELANTO REDEVELOPMENT AGENCY DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. The above recitals are true and correct and are incorporated herein.

SECTION 2. That the Board of the Successor Agency approves and authorizes transmittal of the draft ROPS 24-25, covering the period of July 1, 2024 through June 30, 2025, in substantially the same form attached hereto as Exhibit ‘A’, as required by State law. 412
Successor Agency Resolution No. 23-06

Page 2 ends

SECTION 3. In retaining the responsibilities of the former Adelanto Redevelopment Agency as provided in California Health and Safety Code Section 34177, the Successor Agency Board expressly determines, recognizes, reaffirms, and ratifies the statutory limitation on the liability of the Successor Agency, Successor Agency Board, City of Adelanto, and City Council of the City of Adelanto in retaining the responsibilities of the Adelanto Redevelopment Agency under ABx1 26 and AB 1484. Nothing in this Resolution shall be construed as a commitment, obligation, or debt of the City of Adelanto or any resources funds, or assets of the City to fund the Successor Agency as provided in this Resolution.

SECTION 4. The Executive Director is hereby authorized and directed to submit the ROPS 24-25 set forth in Exhibit ‘A’ to the Oversight Board for approval and transmittal to all required County and State agencies and to be posted as deemed appropriate by the Executive Director.

SECTION 5. The Board Chairman shall sign this Resolution, and the Board Executive Director shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.
413
Successor Agency Resolution No. 23-06

Page 3 ends

PASSED, APPROVED AND ADOPTED this 13th day of December, 2023. ______________________________
Gabriel Reyes, Chairman
_______________________________
Brenda Lopez, Secretary
414
Successor Agency Resolution No. 23-06

Page 4 ends

I, Brenda Lopez, Secretary of the Board of the Successor Agency to the Former Adelanto Redevelopment Agency, do hereby certify that the foregoing Successor Agency Resolution No. 24-01 was duly and regularly adopted at a regular meeting of the Board of the Successor Agency to the Former Adelanto Redevelopment Agency on this 13th day of December, 2023 be the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS THEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 13th day of December, 2023.
______________________________
Brenda Lopez, Secretary
415
Successor Agency: City of Adelanto
County: San Bernardino
Current Period Requested Funding for Enforceable Obligations (ROPS Detail) 24-25 A Total
(July - December)
24-25 B Total
(January - June) ROPS 24-25 Total
A Enforceable Obligations Funded as Follows (B+C+D): $ 3,921,334 $ - $ 3,921,334 B Bond Proceeds 3,139,426 - 3,139,426
C Reserve Balance - - -
D Other Funds 781,908 - 781,908
E Redevelopment Property Tax Trust Fund (RPTTF) (F+G): $ 2,571,682 $ 1,398,221 $ 3,969,903 F RPTTF 2,496,959 1,323,499 3,820,458
G Administrative RPTTF 74,723 74,722 149,445
H Current Period Enforceable Obligations (A+E): $ 6,493,016 $ 1,398,221 $ 7,891,237 Certification of Oversight Board Chairman: Name Title
Pursuant to Section 34177 (o) of the Health and Safety Code, I hereby certify that the above is a true and accurate Recognized Obligation Payment Schedule for the above named successor agency. Signature Date
Recognized Obligation Payment Schedule (ROPS 24-25) - Summary Filed for the July 1, 2024 through June 30, 2025 Period 416

A B C D E F G H I J K L M N O P Q R S T U V W
Bond Proceeds Reserve Balance Other Funds RPTTF Admin RPTTF Bond Proceeds Reserve Balance Other Funds RPTTF Admin RPTTF $ 90,804,339 $ 7,891,237 $ 3,139,426 $ - $ 781,908 $ 2,496,959 $ 74,723 $ 6,493,016 $ - $ - $ - $ 1,323,499 $ 74,722 $ 1,398,221 1 Adelanto Improvement Project,1993 B
Tax Allocation Bonds
Bonds Issued On or
Before 12/31/10
1/1/1993 6/30/2024 Trustee-US Bank Finance costs of Redevelopment Plan Implementation 80-1 (Amended) Adelanto Improvement Project - Y $ - - - - - - $ - - - - - - $ -
2 Adelanto Public Financing Authority,
Local Agency 1995A Taxable
Subordinated Revenue Bonds
Bond Reimbursement
Agreements
1/9/1996 6/30/2026 Trustee-US Bank Various Agency Activities 80-1 (Amended) Adelanto Improvement Project 2,640,360 N $ 1,319,460 - 781,908 491,652 $ 1,273,560 45,900 $ 45,900 3 Adelanto Public Financing Authority,
Local Agency Second Subordinated
1995B Revenue Bonds
Bond Reimbursement
Agreements
1/9/1996 6/30/2026 Trustee-US Bank Various Agency Activities 80-1 (Amended) Adelanto Improvement Project 10,091,348 N $ 1,306,940 991,018 $ 991,018 243,180 $ 243,180 4 Adelanto Public Financing Authority,
Local Agency Third Subordinated
1995C Revenue Bonds
Bond Reimbursement
Agreements
1/9/1996 6/30/2026 Trustee-US Bank Various Agency Activities 80-1 (Amended) Adelanto Improvement Project 8,878,442 N $ 1,870,508 919,939 $ 919,939 950,569 $ 950,569 5 Adelanto Improvement Project, Area
No.3. 2007 Bonds
Bonds Issued On or
Before 12/31/10
12/19/2007 9/1/2037 Trustee-US Bank Economic Development along HWY 395 Project Area 3 4,029,200 N $ 145,200 72,600 $ 72,600 72,600 $ 72,600
6 County of San Bernardino Tax
Increment Loan
City/County Loan (Prior
06/ 28/11), Other
6/18/2005 6/30/2014 County Tax Increment Loan per Settlement Agreement 80-1 (Amended) Adelanto Improvement Project 57,326,483 N $ - $ - $ -
7 Intermountain Power Agency
Settlement Agreement
Litigation 6/15/2005 6/30/2014 IPA Settlement Agreement 80-1 (Amended) Adelanto Improvement Project 1,989,390 N $ - $ - $ -
8 Note Payable to the City of Adelanto City/County Loan (Prior 06/ 28/11), Other
6/25/2005 6/30/2014 City of Adelanto Note Payable to the City for original formation costs All 2,524,245 N $ - $ - $ -
9 Administration Allowance Admin Costs 7/1/2024 6/30/2025 City of Adelanto Admin Allowance All 149,445 N $ 149,445 74,723 $ 74,723 74,722 $ 74,722 10 Audit Fees Admin Costs 7/1/2024 6/30/2025 Pun Group Annual Audit All - Y $ - $ - $ - 11 Bond Admin Fees Fees 7/1/2024 6/30/2025 Trustee-US Bank Trustee of Bonds All 18,500 N $ 18,500 9,250 $ 9,250 9,250 $ 9,250 12 Legal Fees Admin Costs 7/1/2024 6/30/2025 Rutan & Tucker Legal Consulting All - Y $ - $ - $ - 15 Adelanto Improvement Project 3 Improvement/
Infrastructure
1/1/2014 6/30/2014 Various Contracts Improvements developments on 395 Project Area 3 - Y $ - $ - $ -
16 Adelanto Public Financing Authority,
Local Agency Taxable Subordinated
Revenue Bonds
RPTTF Shortfall 1/9/1996 6/30/2026 Trustee-US Bank Various Agency Activities 80-1 (Amended) Adelanto Improvement Project - Y $ - $ - $ -
17 Adelanto Public Financing Authority,
Local Agency Second Subordinated
Revenue Bonds
RPTTF Shortfall 1/9/1996 6/30/2026 Trustee-US Bank Various Agency Activities 80-1 (Amended) Adelanto Improvement Project - Y $ - $ - $ -
18 Adelanto Improvement Project, Area
No.3
RPTTF Shortfall 12/19/2007 9/1/2008 Trustee-US Bank Economic Development along HWY 395 Project Area 3 - Y $ - $ - $ -
25 Long Range Property Plan Property Disposition 3/1/2014 12/31/2014 Kosmont Companies Property Management Plans All - N $ - $ - $ - 27 Long Range Property Plan Property Disposition 1/1/2014 12/31/2014 Title Company Pull titles for various properties All - N $ - $ - $ - 28 Administrative Reimbursement RPTTF Shortfall 1/3/2017 6/30/2049 City of Adelanto Loan to cover shortfall in Administrative Expense All - Y $ - $ - $ - 29 Bonds Annual Continuing Disclosure Fees 12/7/2016 9/1/2037 HdL Coren and Cone Annual Disclosure & Dissemination All 10,000 N $ 7,000 5,000 $ 5,000 2,000 $ 2,000 30 Arbitrage Calculations Fees 1/11/0001 9/1/2037 Wildan Financial Services Bond Arbitrage Calculations All 7,500 N $ 7,500 7,500 $ 7,500 - $ - 31 Excess Bond Proceeds Bonds Issued On or
Before 12/31/10
6/1/2022 9/1/2037 City of Adelanto Vendors Bond Expenditure Agreement Project Area 3 3,139,426 N $ 3,139,426 3,139,426 $ 3,139,426 $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
ROPS 24-25
Total
24-25 A (July - December)
Fund Sources 24-25 A
Total
24-25 B (January - June)
Fund Sources
City of Adelanto Recognized Obligation Payment Schedule (ROPS 24-25) - ROPS Detail July 1, 2024 through June 30, 2025
(Report Amounts in Whole Dollars)
Item # Project Name/Debt Obligation Obligation Type Contract/Agreement Execution Date
Contract/Agreement
Termination Date Payee Description/Project Scope Project Area Total OutstandingDebt or Obligation 24-25 B
Total Retired
417

A B C D E F G H
Reserve Balance Other Funds RPTTF
Bonds issued on or
before 12/31/10
Bonds issued on or
after 01/01/11
Prior ROPS RPTTF
and Reserve
Balances retained for
future period(s)
Rent,
Grants,
Interest, etc.

Non-Admin
and
Admin
1 Beginning Available Cash Balance (Actual 07/01/21)
RPTTF amount should exclude "A" period distribution amount 7,975,935 0 3,472,260 781,631 3,404 G1 - 18-19 PPA
2 Revenue/Income (Actual 06/30/22)
RPTTF amount should tie to the ROPS 21-22 total distribution from the County Auditor-Controller 91,212 0 0 277 4,873,712 3 Expenditures for ROPS 21-22 Enforceable Obligations
(Actual 06/30/22)
0 0 0 4,793,492
4 Retention of Available Cash Balance (Actual 06/30/22) RPTTF amount retained should only include the amounts
distributed as reserve for future period(s)
8,067,147 0 3,472,260 0 0
C4 - Restricted bond proceeds held by trustee plus
the balance of item #31
E4 - Reserved for bond payments held at 50% of
the required payments in the last year of each bond
in order to mitigate a potential RPTTF shortfall
5 ROPS 21-22 RPTTF Prior Period Adjustment
RPTTF amount should tie to the Agency's ROPS 21-22 PPA
form submitted to the CAC
83,624 21-22 PPA
6 Ending Actual Available Cash Balance (06/30/22)
C to F = (1 + 2 - 3 - 4), G = (1 + 2 - 3 - 4 - 5)
$ 0 $ 0 $ 0 $ 781,908 $ 0
F6 - Requested to use other funds on the 24-25
ROPS
No entry required
City of Adelanto Recognized Obligation Payment Schedule (ROPS 24-25) - Report of Cash Balances July 1, 2021 through June 30, 2022
(Report Amounts in Whole Dollars)
ROPS 21-22 Cash Balances
(07/01/21 - 06/30/22)
Fund Sources
Comments
Bond Proceeds
418

SUCCESSOR AGENCY BOARD REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: December 13, 2023
TO: Honorable Chairman and Board Members
FROM: Jesse Flores, Executive Director
BY: Finance
SUBJECT: ADMINISTRATIVE BUDGET FOR JULY 1, 2024 THROUGH JUNE 30, 2025
STAFF RECOMMENDATION:

Staff recommends the Successor Agency Board approve Resolution 24-02, approving the Adelanto Successor Agency Administrative Budget for the fiscal year from July 1, 2024 through June 30, 2025, pursuant to the Health and Safety Code Section 34177(j) and taking certain other related actions.

BACKGROUND:

Pursuant to Part 1.85 of Division 24 of the California Health and Safety Code (the “Redevelopment Dissolution Law”), the Adelanto Successor Agency (Successor Agency) must prepare a proposed Administrative Budget and a Recognized Obligation Payment Schedule (ROPS) for each fiscal year, both of which must be submitted to the Oversight Board for approval. Each proposed Administrative Budget must include all of the following: (1) estimated amounts for Successor Agency administrative costs for the applicable fiscal year; (2) proposed sources of payment for the administrative costs; and (3) proposals for arrangements for administrative and operation services provided by the City or other entity.

The Administrative Budget and ROPS process was formerly completed on a semiannual basis. Under the terms of Senate Bill 107, signed by the Governor on September 22, 2015, the semi-annual process was changed to an annual process.

FISCAL IMPACT:

Under the Redevelopment Dissolution Law, an “Administrative Cost Allowance” is paid to the Successor Agency from property tax revenues allocated by the County Auditor- Controller. The Administrative Cost Allowance is defined as an amount, subject to the approval of the Oversight Board, which is up to 3% of the property tax allocated for enforceable obligations from the Redevelopment Property Tax Trust Fund by the County Auditor-Controller. The amount shall not be less than $250,000 for any fiscal year unless the Oversight Board reduces this amount. The City has requested $149,445 Administrative Cost Allowance which is scheduled to be received by the Successor Agency in two installments on June 1, 419
2024 for the first half of FY 2024-25, and January 2, 2025 for the second half of FY 2024-25. While not anticipated, the Administrative Cost Allowance is subject to reduction if there are insufficient funds to pay the enforceable obligations as listed on the ROPS 24-25.

ATTACHMENTS:

1. Successor Agency Board Resolution 23-07

2. Exhibit ‘A’ – Administrative Budget for July 1, 2024 through June 30, 2025 420
SUCCESSOR AGENCY RESOLUTION NO. 23-07

A RESOLUTION OF THE BOARD FOR THE SUCCESOR AGENCY TO THE FORMER

ADELANTO REDEVELOPMENT AGENCY APPROVING AND ADOPTING THE ADMINISTRATIVE BUDGET FOR THE PERIOD OF JULY 1, 2024 TO JUNE 30, 2025 (ROPS 24-25)
WHEREAS, on February 1, 2012 the Adelanto Improvement Agency, a redevelopment agency created by the City Council of the City of Adelanto was dissolved: and WHEREAS, on February 1, 2012 the City of Adelanto became the Successor Agency for the Adelanto Improvement Agency; and
WHEREAS, Health and Safety Code Section 34171 provides for an Administrative Budget for administrative costs of the Successor Agency to comply with the requirements of Section 34177; and
WHEREAS, Health and Safety Code Section 34177 requires Oversight Board approval for the Successor Agency administrative Cost Budget for each twelve-month fiscal period.

NOW, THEREFORE, THE BOARD OF THE SUCCESSOR AGENCY TO THE

FORMER ADELANTO REDEVELOPMENT AGENCY DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. The Board of the Successor Agency for the Adelanto Improvement Agency approves and adopts the Successor Agency Administrative Budget for July 1, 2024 through June 30, 2025, the form attached as Exhibit A.

SECTION 2. The Board Chairman shall sign this Resolution, and the Board Executive Director shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.
421
Successor Agency Resolution No. 23-07

Page 2 ends

PASSED, APPROVED AND ADOPTED this 13th day of December, 2023. ______________________________
Gabriel Reyes, Chairman
_______________________________
Brenda Lopez, Secretary
422
Successor Agency Resolution No. 23-07

Page 3 ends

I, Brenda Lopez, Secretary of the Board of the Successor Agency to the Former Adelanto Redevelopment Agency, do hereby certify that the foregoing Successor Agency Resolution No. 24-02 was duly and regularly adopted at a regular meeting of the Board of the Successor Agency to the Former Adelanto Redevelopment Agency on this 13th day of December 2023 be the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS THEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 13th day of December, 2024.
______________________________
Brenda Lopez, Secretary
423

ATTACHMENT C
$ 250,000 $ 236,762 $ 13,238 $ 250,000 $ 149,445 $ 100,555 - - -
$ 250,000 $ 236,762 $ 13,238 $ 250,000 $ 149,445 $ 100,555 STAFF:
$ - $ - $ - $ - $ - $ -
Brenda Lopez 10% 13,800 13,805 (5) 13,112 6,903 6,209
City Manager 10% 18,800 21,570 (2,770) 23,085 10,785 12,300 Derik Despain 25% 24,244 25,986 (1,742) 22,650 15,892 6,758 Angel Castellanos 25% 43,550 10,311 33,239 43,954 10,311 33,643 Anna Mosqueda 20% 12,714 5,554 7,160 - 5,554 (5,554)
Anna Mosqueda 25% - - 13,620 - 13,620
- -
HDL Coren & Cone 100% 25,000 19,785 $ 5,215 - - $ -
ICRMA 46,754 96,632 $ (49,878) 26,754 - $ 26,754
Tyler Technolgies 15% 10,360 6,821 $ 3,539 10,360 - $ 10,360 PUN Group 15% - - $ - 12,000 15,000 $ (3,000)
TRS Auditors 25% 15,565 - $ 15,565 $ - Olivarez Madruga Lemieux O’Neill, LLP 100% 7,739 - $ 7,739 - - $ -
Rutan & Tucker 100% 3,140 - $ 3,140 1,200 - $ 1,200
Price and Paige 100% 15,000 2,546 $ 12,454 20,000 20,000 $ - Hewlett-Packard 15% 13,334 13,334 $ - 13,265 - $ 13,265 Leibold McClendon &
Mann, P.C. 100% 20,418 50,000 65,000 $ (15,000)
$ -
$ 250,000 $ 236,762 $ 33,656 $ 250,000 $ 149,445 $ 100,555 Server containing data
Independent auditors
ROPS
Rops Preparation and wind down to last and final
Accounting software
Independent auditors
Legal Fees
Legal Fees
Consultant
not added to admin fee
not added to admin fee
Methodology Implementation Date:
1 Itemized "Expenses" should only reflect the portion paid by RPTTF, not General Fund or other funds $ 113,108 $ 77,226 $ 35,882 $ 116,421
BUDGET METHODOLOGY (Specify: Cost Allocation Plan, Time Study, etc.):

ROPS
City Insurance not added to admin fee
Will drop off after 22-23 FY
Changed to 5% for FY 24-25
Changed to 15% for FY 24-25
Rops Preparation and wind down to last and final
ADMINISTRATIVE BUDGET FY:

Requested
FY 2024-25
Total Administrative Budget
Complete all four columns for Revenue and Expenses throughout form.

Requested
FY 2023-24
Actual
FY 2022-23
Requested
FY 2022-23
RPTTF to Successor Agency1
Entity General Fund to Cover RPTTF Shortfall (If applicable) 2024 - 2025 SUCCESSOR AGENCY NAME: The Successor Agency of The Adelanto RDA = Variance
= Variance
Total Expenses - should equal "RPTTF to Successor Agency"1 Requested
FY 2022-23
Accounts Payable
ADMINISTRATIVE COSTS %
Allocated
City Manager
$ 49,445
Senior Accountant
Finance Director
Other/Indirect: Other - Specify Purpose %
Allocated
Changed to 5% for FY 24-25
Accounts Payable
Changed to 10% for FY 24-25
Sub-Total Personnel Costs
$ 66,976
City Clerk
Changed to 5% For FY 24-25

REVENUE
EXPENSES1
= Variance
= Variance Requested
FY 2024-25
Actual
FY 2022-23
Requested
Description FY 2023-24
COMMENTS/NOTES ON VARIANCES:
424

CITY COUNCIL AGENDA REPORT
| A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: December 13, 2023
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager

THROUGH
BY: James Hirsch, Planning Consultant
SUBJECT: PUBLIC HEARING – APPEAL OF THE PLANNING COMMISSION DECISION TO APPROVE LOCATION AND DEVELOPMENT PLAN 22-08 AND ADOPT THE

CATEGORICAL EXEMPTION (CE) FOR THE PROJECT
STAFF RECOMMENDATION:

Staff recommends that the City Council, DENY THE APPEAL and APPROVE/ADOPT the Categorical Exemption (CE) for Location and Development Plan 22-08 and adopt Council Resolution No. 23-14 (Attached as Exhibit A) adopting the findings and approving/adopting the CE for Location and Development Plan 22-08, a 3.28 acre site located at 16454 Adelanto Road in the Light Manufacturing (LM) zoning district in the City of Adelanto, California (APN :3128 -231-04).

BACKGROUND:

At the meeting of November 16, 2022, the Planning Commission unanimously approved (vote of 4-0) Location & Development Plan 22-08 and a Categorical Exemption for the project. The signed Planning Commission Resolution is attached as Exhibit B.

An Appeal of the Planning Commission Approval was filed on November 29, 2022, ten (10) working days following the Planning Commission hearing by the Supporters Alliance for Environmental Responsibility (“SAFER”). The appeal application, attached as Exhibit C, opposes the adoption of the CE for Location and Development Plan 22-08.

An Appeal Hearing was scheduled for a City Council Hearing for December 13, 2023 and a public notice was published.
425
LDP 22-08
Council Appeal

Page 2 ends

PROJECT DESCRIPTION:

The project involves a Location and Development Permit LDP 22-08 to construct a 49,798 square-foot warehouse on a 3.28 acre site. Approximately 10.885 % of the site will be reserved for landscaping.

The site’s Accessor Parcel Number is 3128-231-04 with a zoning designation of Light Manufacturing (LM), City of Adelanto, San Bernardino County.

APPEAL DISCUSSION OF THE ADOPTION/APPROVAL OF CATEGORICAL EXEMPTION (CE):

The Appellant, SAFER, outlines their basis for appealing the adoption of the CE for LDP 22-08, attached as Exhibit C. In summary, SAFER argues the following:

I. The Project requires the preparation of an EIR or MND prior to approval; II. The Project would be approved in violation of CEQA (EIR or MND must be prepared); and III. The Project violates the State Planning and Zoning Law as well as the City’s General Plan In response to the Appellant’s contentions, the Chambers Group, the Environmental Consultant that prepared the CE CEQA document, responded to the Appeal claims in a memorandum, Attached as Exhibit E, which is summarized as follows:

I. A Categorical Exemption was determined to be the appropriate environmental document, rather than an EIR or an MND because following the preparation of an Initial Study, the City, as Lead Agency determined that in light of the whole record, the proposed project would not result in significant impacts to the environment pursuant to CEQA Class 32 Infill Exemption (14 CCR §15332; and
II. The project does not violate State Planning and Zoning Laws or the City’s General Plan as it does not directly conflict with the City’s General Plan, nor does it interfere or frustrate the General Plan’s policies or objectives as evidenced by the findings and whole of the record. lll. Existing on the site is a vacant manufactured commercial building, an iron fence, and two concrete slabs, including a designated parking area. Beginning at the eastern entrance gate, and surrounding the parking slab, is a slightly dispersed layering of 1-4-inch sized rip rap gravel.

There are also multiple imported pine trees separating the building and parking slab. Located to the west of the building are two Conex boxes. The site contains minimal vegetation.

Subsequent to the Planning Commission hearing and the filing of the appeal, the applicant’s representative, working with the owner, was able to find photographs of buildings, landscaping and paving that was constructed on the site previously which are attached as Exhibit F. Remnants of this development still exist on the site. 426
LDP 22-08
Council Appeal

Page 2 ends

FISCAL IMPACT:

An Appeal of Planning Commission Decision fee of $2,146.00 was paid by SAFER.

EXHIBITS:

A. Council Resolution No. 23-14 denying the Appeal
B. Planning Commission Resolution 23-41 (Signed)
C. SAFER Appeal Package LDP 22-08
D. Planning Commission Staff Report Package, November 16, 2022 E. Chambers Group Response to Appeal Memo, March 2, 2023 F. Photos of buildings,landscaping, paving and other urban uses previously constructed on the site G. Site Plan, Elevations, Building plans,landscape plan 427

EXHIBIT A
RESOLUTION NO. 23-14

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

ADELANTO, COUNTY OF SAN BERNARDINO, CALIFORNIA, MAK

ING FINDINGS, DENYING APPEAL OF PLANNING COMMISSION

DECISION, AND APPROVING AND ADOPTING LOCATION AND
DEVELOPMENT PLAN 22-08 AND THE CATEGORICAL
EXEMPTION(CE) FOR LOCATION AND DEVELOPMENT PLAN 22-08
ON A 3.28-ACRE SITE LOCATED AT 16454 ADELANTO ROAD IN THE

LIGHT MANUFACTURING (LM) ZONING DISTRICT IN THE CITY OF ADELANTO, CALIFORNIA (APN: 3128-231-04).

WHEREAS, the Supporters Alliance for Environmental Responsibility (SAFER) filed an appeal of the Planning Commission’s adoption of the Categorical Exemption (CE) for Location & Development Plan 22-08 (“the Project”) on November 29, 2022, which was within ten (10) working days following the Planning Commission’s unanimous approval of the Project; and WHEREAS, on November 16, 2022, the Planning Commission unanimously approved (vote of 4-0) Location & Development Plan 22-08 and adopted a Categorical Exemption for the project; and
WHEREAS, the applicant timely appealed the Planning Commission’s decision; and WHEREAS, the City of Adelanto, as lead agency, determined that a Categorical Exemption for the proposed project was the appropriate environmental document to adopt for the project pursuant to Sections 20192 of the California Public Resources Code and 15332 of the California Environmental Quality Act, Guidelines; and
WHEREAS, the Planning Commission reviewed and considered the environmental information included in the staff report prior to acting on proposed the Project ( Location and Development Plan 22-08) and determined that the City has complied with the California Environmental Quality Act; and
WHEREAS, the Planning Commission reviewed and considered the Project (Location and Development Plan 22-08) and the Council affirms and adopts the Planning Commission findings of General Plan consistency, as presented in the record, as well as all Planning Commission findings outlined in the record for the Project; and
WHEREAS, in accordance with State law, on December 13, 2023, City Council conducted a duly notice public hearing on the project, took information presented by City staff and public testimony regarding the Project, and considered the Project; and NOW, THEREFORE, BE IT RESOLVED by the City Council as follows:
428
RESOLUTION NO. 23-14
December 13, 2023

Page 2 ends

SECTION 1. The above recitals are all true and correct.

SECTION 2. The City Council has reviewed and considered the information included in the staff reports prior to taking action on the Appeal. The City Council further finds and determines that the City has complied with the California Environmental Quality Act and the City Council determinations reflect the independent judgment of the City Council.

SECTION 3. The City Council hereby denies the appeal and upholds the Planning Commission’s decision to adopt the Categorical Exemption (CE), the and the Project and finds and determines that City as Lead Agency met the requirements established by the City of Adelanto Municipal Code, Section 17.190 (Environmental Review) and the provisions of California Public Resources Code 21000 et seq. pursuant to the Guidelines adopted by the Secretary of Resources and incorporated into the California Code of Regulations, Title 14, Section 15332 et seq.

SECTION 4. The City Council hereby upholds the Planning Commission adoption of the CE for the Project ( LDP 22-08) as well as the approval of the Project.

SECTION 5. The City Council hereby finds and determines that:

Location and Development Plan 22-08
(a) That the proposed Location and Development Plan is consistent with the General Plan; The project is consistent with the General Plan as the site is designated Light Manufacturing (LM) which is consistent with Title 17 of the Zoning Code, which allows for the proposed uses in the LM zoning district with an approved Location and Development Plan.
(b) That the nature, condition, and development of adjacent uses, buildings, and structures have been considered, and that the use will not adversely affect or be materially detrimental to these adjacent uses, buildings, or structures; The proposed project will not adversely affect or be materially detrimental to adjacent uses, in that surrounding properties to the north and south are self storage buildings on land zoned Mixed Use (MU) and to the west is Highway 395 with vacant land beyond and to the east is Adelanto Road with vacant land beyond zoned LM. Thus, the proposed project will be compatible with future uses.
(c) That the site for the proposed use is of adequate size and shape to accommodate the use and buildings proposed; The overall site is approximately 3.28-acres in size, which exceeds the minimum 20,000 square feet required in the Light Manufacturing zoning district and is of adequate size and shape to accommodate the use and proposed building and improvements.
429
RESOLUTION NO. 23-14
December 13, 2023

Page 3 ends

(d) That the proposed use complies with all applicable development standards of the zoning district; and The proposed project has been designed and conditioned to meet all applicable City zoning and development standards for the Light Manufacturing zoning district.
(e) That the proposed use observes the spirit and intent of this Zoning Code. The proposed project meets the requirements of the Zoning Code. In addition, to ensure all Code requirements are met, conditions of approval have been added requiring that the project meet code requirements.

PASSED, APPROVED AND ADOPTED by the City Council this 13 day of December, 2023. _________________________________

GABRIEL REYES, MAYOR
ATTEST:
___________________________________

BRENDA LOPEZ, CITY CLERK CMC
430
RESOLUTION NO. 23-14
December 13, 2023

Page 4 ends

I, Brenda Lopez, City Clerk of the City of Adelanto, California, do hereby certify that the foregoing Resolution No. 23-14 was duly and regularly adopted at a regular meeting of the City Council of the City of Adelanto on the 13th day of December 13, 2023, by the following vote, towit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 13th day of December, 2023.
___________________________________
Brenda Lopez, CMC
City Clerk
SEAL
431

ATTACHMENT A
Resolution P-22-41
RESOLUTION NO. P-22-41

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF

ADELANTO, SAN BERNARDINO COUNTY, CALIFORNIA, MAKING

FINDINGS, ADOPTING THE CATEGORICAL EXEMPTION AND
APPROVING LOCATION AND DEVELOPMENT PLAN 22-08 TO ALLOW
THE CONSTRUCTION OF construction of a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility on a 3.28 acre site zoned LM at 16454 Adelanto Road with 27 loading docks; three at level height and 24 at dock height. (APN: 3128-231-04)
WHEREAS, the applicant, Chuck Minyard representing Primior Development, has proposed to construct a construction of a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility on a 3.28 acre site zoned LM at 16454 Adelanto Road with 27 loading docks; three at level height and 24 at dock height in the City of Adelanto (APN: 3128-231-04), County of San Bernardino; and
WHEREAS, the applicant has consented to all conditions of approval; and WHEREAS, a duly noticed public hearing was held by the Adelanto Planning Commission on November 16, 2022, to hear and consider testimony for or against the proposed project; and WHEREAS, the City of Adelanto, as lead agency, determined that a Categorical Exemption for the proposed project should be prepared for adoption pursuant to Section 15332, Class 32 of the California Environmental Quality Act, Guidelines; and NOW, THEREFORE, BE IT RESOLVED by the Planning Commission as follows:

SECTION 1. The above recitals are all true and correct.

SECTION 2. The Planning Commission has reviewed and considered the environmental information included in the staff report prior to acting on proposed Location and Development Plan 22-08. The Planning Commission further finds and determines that the City has complied with the California Environmental Quality Act and the Planning Commission determinations reflect the independent judgment of the Planning Commission.

SECTION 3. The Planning Commission hereby finds and determines that:

Location and Development Plan 22-08
(a) That the proposed Location and Development Plan is consistent with the General Plan;
The project is consistent with the General Plan as the site is designated Light Manufacturing (LM), which is consistent with Title 17 of the Zoning Code, which allows for the proposed use in the Light Manufacturing (LM) zoning district with an approved Location and Development Plan.
432
RESOLUTION NO. P-22-41
November 16, 2022

Page 2 ends

(b) That the nature, condition, and development of adjacent uses, buildings, and structures have been considered, and that the use will not adversely affect or be materially detrimental to these adjacent uses, buildings, or structures; The proposed project will not adversely affect or be materially detrimental to adjacent uses, in that surrounding properties to the north, south, east and west are all currently vacant land, and also zoned as Mixed Use (MU) or Light Manufacturing (LM). Thus the proposed project will be compatible with future uses. (c) That the site for the proposed use is of adequate size and shape to accommodate the use and buildings proposed;
The overall site is approximately 3.28 acres or 142,950 SF in size, which exceeds the minimum 20,000 square feet required in Light Manufacturing (LM) zoning district and is of adequate size and shape to accommodate the use and proposed building and improvements.
(d) That the proposed use complies with all applicable development standards of the zoning district; and
The proposed project has been designed and conditioned to meet all applicable City zoning and development standards for the LM zoning district. (e) That the proposed use observes the spirit and intent of this Zoning Code.

The proposed project meets the requirements of the Zoning Code. In addition, to ensure all Code requirements are met, conditions of approval has been added requiring that the project meet code requirements.

ATTACHMENTS:

Attachment B: Conditions of Approval LDP 22-08
PASSED, APPROVED AND ADOPTED by the Planning Commission this 16 th day of November,
2022.
___________________________________
Chris Waggener,
Chairman of the Planning Commission
___________________________________
Nyeka Allen
Secretary to the Planning Commission
433
RESOLUTION NO. P-22-41
November 16, 2022

Page 3 ends

I, Nyeka Allen, Planning Secretary for the Planning Commission of the City of Adelanto, California, do hereby certify that the foregoing Resolution No. P-222-41 was duly and regularly adopted at a regular meeting of the Planning Commission of the City of Adelanto on the 16 th day
of November , 2022, by the following vote, to-wit:

AYES: Chair Waggener, Vice-Chair Delgado, Commissioners Meza, Soto NOES: none
ABSENT: none
ABSTAIN: none
IN WITNESS WHEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 16
th day of November, 2020.
___________________________________
Nyeka Allen
Secretary to the Planning Commission
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453

PLANNING COMMISSION AGENDA REPORT
DATE: November 16, 2022
TO: Honorable Chairman and Members of the Planning Commission FROM:

BY:

John Thomason, Development Services Director
James Hirsch, Project Planner
SUBJECT: Location and Development Plan 22-08 - The proposed Project involves the construction of a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility on a 3.28 acre site zoned LM at 16454 Adelanto Road with 27 loading docks; three at level height and 24 at dock height. The proposed Project would also contain offices, four restrooms, two shower rooms, a break room, a guard house, and a trash enclosure. The Project site would contain 43 parking spaces, including 2 ADA-compliant parking spaces. The parking and facility would be contained behind a security gate that would be operated by the staff in the guard house. An underground detention system would be used in the drive aisle to help with offsite flows. The Project is a permitted use under the existing LM zoning.
(APN : 3128-231-04-0000)
STAFF RECOMMENDATION:

ADOPT Resolution P-22-41, Adopting the Categorical Exemption (CE) and approving Location and Development Plan (LDP) # 22-08 to facilitate the construction of a 49,798 SF industrial building, and other related improvements on a 3.28 acre lot in a Light Manufacturing (LM) zone, based on the findings and subject to conditions of approval.

BACKGROUND:

Applicant: Chuck Minyard
Primior Development
750 North Diamond Bar Boulevard
Diamond Bar, California 91765
General Location: 16454 Adelanto Road between Iris St and Cassia Road within the City of Adelanto, County of San Bernardino.

Assessor’s Parcel No: (APN : 3128-231-04-0000)
454
LDP 22-08
November 16, 2022
2 Environmental Determination: A Categorical Exemption (CE) Existing General Plan &
Current Zoning Designation: Light Manufacturing (LM)
Surrounding General Plan and Zoning:

Direction General Plan Zoning
North Mixed Use (MU) MU
South Mixed Use (MU) MU
East Adelanto Road, & Light Manufacturing (LM) LM
West Hwy 395 & R-M12 (Medium Density Residential) R-M 12 Existing Land Use: The project site is currently vacant and disturbed Surrounding Land Uses: The following chart shows the surrounding land uses:

Direction Land Use
North Self Storage facility
South Self Storage facility
East Adelanto Road/ vacant land
West Hwy 395/ vacant land
ANALYSIS & REVIEW:

PROJECT DESCRIPTION

The applicant, Chuck Minyard representing Primior, is proposing the construction of a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility on a 3.28 acre site zoned LM at 16454 Adelanto Road with 27 loading docks; three at level height and 24 at dock height. The proposed Project would also contain offices, four restrooms, two shower rooms, a break room, a guard house, and a trash enclosure. The Project site would contain 43 parking spaces, including 2 ADA-compliant parking spaces. The parking and facility would be contained behind a security gate that would be operated by the staff in the guard house. An underground detention system would be used in the drive aisle to help with offsite flows. The Project is a permitted use under the existing LM zoning.

Operation: The facility would likely be staffed 14 hours a day (Monday through Friday) from approximately 7:00 A.M. until 9:00 PM, and would be operated with approximately 20 employees including those in the guard shack provided onsite. LED lighting would be provided at night for security purposes and would comply with the City lighting requirements. Approximately 15 truck trips would be completed per working day. The site would allow for delivery and export of auto parts, and electrical and fork-lift parts. No cooling or cold storage would be required 455
LDP 22-08
November 16, 2022
3 PROJECT ANALYSIS:

GENERAL PLAN AND ZONING CONSISTENCY
The Project is designated as Light Manufacturing (LM) as of City Council Resolution No. 22-72 approving GPA 22-05 on October 26,2022 and is a permitted use in this zoning district. The project will expand the allowed manufacturing and industrial uses contemplated by the City’s Adelanto North 2035 Sustainable Plan. As such, the proposed project is consistent with the Adelanto North 2035 Sustainable Plan. More specifically, the project is consistent with Chapter 3, Economic Development, in that it helps to implement Economic Development goals and policies, including job creation, infrastructure expansion and revenue generation.

The project is also consistent with the surrounding MU and LM zoning land uses. As designed and conditioned, the project provides for the development of an industrial use that has been designed in compliance with the applicable MU and LM development and design standards, policies and guidelines outlined in the City’s Zoning Code. As such, the proposed project is consistent with the City’s Adelanto North 2035 Sustainable Plan.

DEVELOPMENT STANDARDS
The proposed project is subject to the development standards of the Light Manufacturing (LM) district, which allows for a wide range of industrial uses, including light and heavy industrial and manufacturing uses. Table 1 below outlines the development standards for the LM and demonstrates that the project meets or exceeds all standards.

As shown in Table 2 above, the proposed project meets or exceeds the development standards established for the LM Zoning District.

Table 2: LM Development Standards
Development
Standards
Required Provided Complies?
Minimum Lot Size 20,000 SF 142,950 SF Yes
Minimum Lot Width 100’ 210’’ Yes
Minimum Lot Depth 100’ 725’ Yes
Minimum Front Setback
• To Building
• To Parking Area
25’
10’
25+10+
’

Yes
Minimum Side & Rear Yard
Setback
• To Building
• To Parking
25’
10’
25+10+

Yes
Maximum Building Height 75’ max 38-4” Yes

Landscaping Required 5% of the project area & 10% of parking areas

10.885% Yes
456
LDP 22-08
November 16, 2022
4 PARKING, LOADING, ASSET STORAGE
The proposed project must comply with the Parking and Loading Standards of the Chapter 17.65 of the Adelanto Municipal Code (AMC), which requires all industrial developments to provide off-street parking and loading facilities. Table 2 below provides a summary of the type and required number of parking stalls provided compared to the number of stalls provided.

Table 2. PARKING REQUIREMENTS (Per Section 17.65 of the AMC) Use SF of Use Code Ratio Spaces
Required
Spaces
Provided
Complies
Office: 2,560 SF 1: 250 SF 11 11 Yes
Warehouse/Storage 49,798 SF 1/1,000 SF 32 32 Yes
Guard House 60 SF NA Yes
Totals 52,418 SF - 43 43 Yes
Handicap Spaces - 26-50 spaces 2 3 Yes
-
The proposed parking and loading areas will be paved per AMC requirements.

FENCING/SCREENING, SECURITY
The lot perimeter will be completely screened from the adjacent properties and surrounding public right-of-ways by an 7’ 6” high metal fence supported by an interior steel posts and bars and the required perimeter landscaping. The metal fence will also be graffiti coated. Security will be provided by laser scanning motion sensing cameras and electrical fencing inside of perimeter fencing. A security plan will be prepared and implemented to guard assets and improvements and lessen potential impacts on public safety services.

TRAFFIC & SITE ACCESS/CIRCULATION
Parking, Circulation and Site Access Regional access to the Project site is provided by the US-395 Highway at the Project site and Holly Road approximately 0.4 miles south of the Project site. The northsouth roadway of Adelanto Road and the east-west roadway of Holly Road provides local circulation.

The existing driveway off of Adelanto Road would be utilized as the main entrance for the Project. A minimum driveway width of 50 feet would be provided for throughout the Project site, and a 457
LDP 22-08
November 16, 2022
5 turnaround would be located at the back of the building.

OFF-SITE STREET IMPROVEMENTS
The applicant is required to provide street lights, fire hydrants, connect to City sewer, Adelanto Public Utility Authority (APUA) and pay applicable Development Impact Fees (DIF), including Circulation Development Impact Fees and Drainage Facility Development Impact Fees based on the Developed Area.

BUILDING DESIGN/ARCHITECTURE
The proposed building would be prefabricated before arriving to the site, utilize approximately 37.6 percent of the site, and occupy approximately 49,798 square feet with a floor to area ratio of 0.37. The Project would have a maximum elevation of 38 feet 4 inches.

The proposed 1-story building provides for appropriate scale, massing and building relief, including a varied roofline with a parapet, an articulated façade and varied materials that provide for a distinguishable building base, body and cap. The building will improve the appearance of the LM district, while creating an identifiable community and business image for Primior, which will help to strengthen the local economy and enhance the quality of life for Adelanto residents.

HYDROLOGY & WATER QUALITY
The project applicant will be required to conform to Section 17.93.060 – Runoff Control of the Adelanto Municipal Code. In addition, stormwater discharges from construction activities that disturb one or more acres, or smaller sites disturbing less than one acre that are part of a common plan of development or sale, are regulated under the National Pollutant Discharge Elimination System (NPDES) stormwater permitting program. Prior to start of construction, construction operators must obtain coverage under a NPDES permit, which is administered by the State.

CONSTRUCTION:

Project construction is expected to begin in January 2023 and is assumed to last 6 months. Project construction would include site preparation, grading, building construction, paving, and architectural 16454 Adelanto Road Warehouse IS Adelanto, California Chambers Group, Inc. 21354 8 coating phases.

Expected equipment would include excavators, backhoes, cranes, forklift, and bobcat. The Project would require 1,1,90 cubic yards of cut and 4,850 cubic yards of fill, resulting in an import total of 3,660 cubic yards. The final grading quantities will be confirmed during plan check. Water during construction would be used for dust suppression and would be brought to the site with a water truck.

Up to 30 construction workers per day would be onsite during the construction phase and it is anticipated that they come from the local work force. Construction activities would occur from 7:00 a.m. to dusk, in compliance with the City Municipal Code. 1.8.6 Operation The facility would likely be staffed 14 hours a day (Monday through Friday) from approximately 7:00 A.M. 458
LDP 22-08
November 16, 2022
6 ENVIRONMENTAL DETERMINATION:
- Categorically Exempt pursuant to Section 15332, Class 32 of the California Environmental Quality Act, In-Fill Development Project. . A copy of the Categorical Exemption can be viewed at:
https://www.ci.adelanto.ca.us/377/CEQA-Process-Policy
A public hearing notice was sent to property owners within 300 feet of the project site for the November 16,2022 Planning Commission meeting. As of the writing of this report, no written comments have been received by staff.

ATTACHMENTS:

Attachment A: Resolution P-22-41
Attachment B: Conditions of Approval (Planning)
Attachment C: Site & Landscape Plan, Elevations
Attachment D: Site Zoning
Attachment E: Conditions of Approval (Building & Safety, Public Works/ Engineering,)

The project CE - and Associated Studies are on File at the Planning Department 459

ATTACHMENT A
Resolution P-22-41
RESOLUTION NO. P-22-41

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF

ADELANTO, SAN BERNARDINO COUNTY, CALIFORNIA, MAKING

FINDINGS, ADOPTING THE CATEGORICAL EXEMPTION AND
APPROVING LOCATION AND DEVELOPMENT PLAN 22-08 TO ALLOW
THE CONSTRUCTION OF construction of a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility on a 3.28 acre site zoned LM at 16454 Adelanto Road with 27 loading docks; three at level height and 24 at dock height. (APN: 3128-231-04)
WHEREAS, the applicant, Chuck Minyard representing Primior Development, has proposed to construct a construction of a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility on a 3.28 acre site zoned LM at 16454 Adelanto Road with 27 loading docks; three at level height and 24 at dock height in the City of Adelanto (APN: 3128-231-04), County of San Bernardino; and
WHEREAS, the applicant has consented to all conditions of approval; and WHEREAS, a duly noticed public hearing was held by the Adelanto Planning Commission on November 16, 2022, to hear and consider testimony for or against the proposed project; and WHEREAS, the City of Adelanto, as lead agency, determined that a Categorical Exemption for the proposed project should be prepared for adoption pursuant to Section 15332, Class 32 of the California Environmental Quality Act, Guidelines; and NOW, THEREFORE, BE IT RESOLVED by the Planning Commission as follows:

SECTION 1. The above recitals are all true and correct.

SECTION 2. The Planning Commission has reviewed and considered the environmental information included in the staff report prior to acting on proposed Location and Development Plan 22-08. The Planning Commission further finds and determines that the City has complied with the California Environmental Quality Act and the Planning Commission determinations reflect the independent judgment of the Planning Commission.

SECTION 3. The Planning Commission hereby finds and determines that:

Location and Development Plan 22-08
(a) That the proposed Location and Development Plan is consistent with the General Plan;
The project is consistent with the General Plan as the site is designated Light Manufacturing (LM), which is consistent with Title 17 of the Zoning Code, which allows for the proposed use in the Light Manufacturing (LM) zoning district with an approved Location and Development Plan.
460
RESOLUTION NO. P-22-41
November 16, 2022

Page 2 ends

(b) That the nature, condition, and development of adjacent uses, buildings, and structures have been considered, and that the use will not adversely affect or be materially detrimental to these adjacent uses, buildings, or structures; The proposed project will not adversely affect or be materially detrimental to adjacent uses, in that surrounding properties to the north, south, east and west are all currently vacant land, and also zoned as Mixed Use (MU) or Light Manufacturing (LM). Thus the proposed project will be compatible with future uses. (c) That the site for the proposed use is of adequate size and shape to accommodate the use and buildings proposed;
The overall site is approximately 3.28 acres or 142,950 SF in size, which exceeds the minimum 20,000 square feet required in Light Manufacturing (LM) zoning district and is of adequate size and shape to accommodate the use and proposed building and improvements.
(d) That the proposed use complies with all applicable development standards of the zoning district; and
The proposed project has been designed and conditioned to meet all applicable City zoning and development standards for the LM zoning district. (e) That the proposed use observes the spirit and intent of this Zoning Code.

The proposed project meets the requirements of the Zoning Code. In addition, to ensure all Code requirements are met, conditions of approval has been added requiring that the project meet code requirements.

ATTACHMENTS:

Attachment B: Conditions of Approval LDP 22-08
PASSED, APPROVED AND ADOPTED by the Planning Commission this 16 th day of November,
2022.
___________________________________
Chris Waggener,
Chairman of the Planning Commission
___________________________________
Nyeka Allen
461
RESOLUTION NO. P-22-41
November 16, 2022

Page 3 ends

Secretary to the Planning Commission
I, Nyeka Allen, Planning Secretary for the Planning Commission of the City of Adelanto, California, do hereby certify that the foregoing Resolution No. P-222-41 was duly and regularly adopted at a regular meeting of the Planning Commission of the City of Adelanto on the 16 th day
of November , 2022, by the following vote, to-wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 16
th day of November, 2020.
___________________________________
Nyeka Allen
Secretary to the Planning Commission
462
Attachment B
Conditions of Approval
Location and Development Plan 22-08
November 16,, 2022 Planning Commission Meeting
PROJECT: Location and Development Plan 22-08 – A proposal to construct a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility on a 3.28 acre site zoned LM at 16454 Adelanto Road with 27 loading docks; three at level height and 24 at dock height. The proposed Project would also contain offices, four restrooms, two shower rooms, a break room, a guard house, and a trash enclosure. The Project site would contain 43 parking spaces, including 2 ADA-compliant parking spaces. The parking and facility would be contained behind a security gate that would be operated by the staff in the guard house. An underground detention system would be used in the drive aisle to help with offsite flows. The Project is a permitted use under the existing LM zoning. (APN : 3128-231-04-0000) Applicant: Primior

PLANNING DEPARTMENT
General Conditions:

1. Approval Period. Approval of this project will become valid only after a signed copy of the City’s approval letter is received by the Planning Department acknowledging acceptance of all conditions of approval. If not received within 10 working days after approval action, this approval will be null and void.

This approval shall be used within two (2) years of the approval date of this project; by November 16, 2024, otherwise, it shall become null and void and of no effect whatsoever. Use means the beginning of the substantial construction under this approval within the two (2) year period which is thereafter diligently pursued to completion and in the event the use hereby permitted ceases operation for a period of one (1) year or more, this approval shall become null and void.

2. Modification to Plans. Subsequent modifications of this approval, which do not intensify the use, including but not limited to reorientation of structures, alteration of parking and circulation design, minor changes to the Conditions of Approval, interpretations of the Conditions of Approval relative to intent, necessity of, and timing, may be approved by the Community Development Director, unless the Director requires a Substantial Conformance or Revised Permit application in accordance with the City’s Development Code.

3. Phasing. Phasing is not indicated on this Site Plan. The Conditions of Approval shall apply to the entire development within the 3.28-acre site as shown on the Site Plan, unless otherwise indicated.
463
LDP 22-08 Conditions of Approval

Page 2 ends

4. Indemnity. The applicant shall defend (with attorneys approved by the City), indemnify and hold harmless the City of Adelanto, its agents, officers, and employees from any claims, damages, action, or proceeding against the City or its agents, officers, or employees to attack, set aside, void, or annul, an approval of the City, its advisory agencies, appeal boards, or legislative body concerning Location and Development Plan 19-15. The City will promptly notify the permittee of any such claim, action, or proceeding against the City and will cooperate fully in the defense.

5. Indemnification of the City. (a) Applicant shall defend and indemnify the City, its agents, officers and employees from all claims against the City for damages, and other action, liability or proceeding to attack, set aside, void or annual the Project or any act or determination related to City’s approval of the Project. Applicant’s obligations under this Agreement shall include, without limitation, payment of all court costs and attorney fees, all litigation-related costs, all judgments and awards against the City, and all settlement costs.
(b) The City shall notify the Applicant promptly of any claim, action or proceeding and reasonably cooperate in the defense. Upon receiving such notification, Applicant shall assume the defense of the claim, action, or proceeding, including the employment of counsel satisfactory to City, which approval shall not be unreasonably withheld. In the event of a disagreement between the City and Applicant over litigation issues, City shall have authority to control the litigation and make litigation decisions, including but not limited to, settlement or other disposition of the matter. City’s participation in the defense of any such action shall not relieve the Applicant of any obligation imposed by this condition. If City determines that having common counsel would create a conflict of interest, or if Applicant fails to promptly assume the defense or to promptly employ counsel satisfactory to City, then City may hire counsel for its own defense, and Applicant shall pay the reasonable attorney fees and costs of such counsel within 30 days after receiving itemized invoices. Applicant shall also pay for all costs and fees related to any additional investigation or study, or for supplementing or revising any document, including, without limitation, environmental documents.

6. Fees. All fees and charges the City has or intends to adopt that are due at the time of utility connection or when building permit(s) is/are issued shall be paid for the Developed Area, as required by the City.

7. Outstanding Costs. Any fees due to the City of Adelanto for processing this project shall be paid to the City within 30 calendar days of final action. Failure to pay such outstanding fees within the time specified shall invalidate any approval or conditional approval granted by this action. No permits, site work, or other actions authorized by this entitlement shall be permitted, authorized or commenced until all outstanding fees are paid to the City.

8. CEQA/Fish and Game Fees. The applicant/owner shall pay to the Department of Fish and Game determination for a Mitigated Negative Declaration. This fee shall be submitted directly to San Bernardino County, along with the required Notice of Determination and fee, within five (5) days after the effective date of conditional approval.

The applicant should be aware that Section 21089(b) of the Public Resources Code provides that any project approved under CEQA is not operative, vested or final until the required fee is paid. Proof of fee payment will be required prior to issuance of any permits.
464
LDP 22-08 Conditions of Approval

Page 3 ends

9. Architectural Design. The proposed architectural design shall be consistent with the design standards provided in the Adelanto General Plan and Industrial Design Guidelines, as shown on the approved site plan package, stamped 3.18.20, presented to the Planning Commission.

10. City Codes. The project shall comply with all disabled access requirements of the Americans with Disabilities Act and Title 24 of the State Code, and all local requirements of the City of Adelanto Municipal Code, including Title 17 (Zoning Code), especially the following Light Manufacturing zoning district regulations, approved site plan package, stamped 11/2022, presented to the Planning Commission.

11. Maintenance Responsibility. The maintenance of graded slopes and landscaped areas shall be the responsibility of the developer until the transfer to an approved maintenance authority. Grading permits shall not be issued for any areas to be graded and remain undeveloped for an extended period (i.e. for subsequent phases of a development) until a re-vegetation plan is approved by the Planning Department, and until bonds are posted for re-vegetation, or erosion control program for wind erosion.

12. Plans. Plan submittals shall be prepared and signed by a California Licensed Architect or Engineer per State of California, Business and Professions Code. All plans shall be drawn to a standard scale.

13. Development Restrictions. The physical development of the Primior distribution yard shall be reviewed and approved by the City. Any use, activity, and/or development occurring on the site without appropriate City approvals shall constitute a code violation and shall be treated as such. Placement of any construction trailer or storage of construction materials shall require separate review and approval by the City.

14. Trash Enclosures. Trash receptacles proposed on the site shall be enclosed by a six (6) foot high solid masonry wall with solid, view-obstructing gates. A pedestrian entrance shall be provided into each trash enclosure.

15. Approved Uses. All new uses within the property boundaries shall be reviewed and approved by the Planning Department. Should the developer propose a more intensive use requiring additional parking spaces, additional employees, more restroom facilities, significant change from original conceptual landscaping plans, etc., the proposed use shall be presented for review by the Planning Department for compliance with the original approval. The new proposed use may be subject, but not limited to: A Modification to Location and Development Plan application, a new Location and Development Plan Application, and/or a Utility Feasibility Study application.

16. Required Approvals. The developer shall obtain the following clearances or approvals:
a. Verification from the Planning Department that all pertinent conditions of approval have been met, including any administrative development plan review approvals, as mandated by the Adelanto Municipal Code.
b. Building and Safety Department
465
LDP 22-08 Conditions of Approval

Page 4 ends

c. Engineering Department
d. San Bernardino County Fire Department
e. Mojave Desert AQMD
f. Department of Fish and Game
g. Any other required approval from an outside agency.

Prior to Issuance of Grading Permits:

18. Grading Plans. Grading plans shall be reviewed and approved by the Planning Department for compliance with the approved Development Plan prior to the issuance of a grading permit.

19. Signed Approval Letter. A signed copy of the City’s approval letter shall be on file with the Planning Department. If ownership of the property or the developer of the property has changed since the original approval, a new copy of the City approval letter shall be signed by the current development parties.

20. The conditions of approval for Location and Development Plan 22-08 shall be included on the construction plans and submittal to the Building and Safety Department for Plan Check.

Prior to Issuance of Building Permits:

23. Development Impact Fees. The City of Adelanto has implemented development impact fees for various infrastructure and capital facilities needs generated by new development.

These fees will provide for various capital facilities including, but not limited to, roads, parks, flood control and drainage, public facilities, and fire fighting facilities. This project shall be subject to all such existing and future development impact fees, which are in effect at the time building permits are issued.

24. Assessment Districts. Prior to the issuance of building permits, this project shall annex into Assessment Districts for the maintenance of Street Lighting, public landscaping and street sweeping, and the applicant hereby agrees to waive the right to protest the formation of said districts.

25. Building Plans. Building plans shall be reviewed and approved the Planning Department for conformance to the Conditions of Approval and the approved Development Plan prior to issuance of a building permit.

26. Water Quality. The applicant shall submit to the City Engineer for approval, a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The Water Quality Management 466
LDP 22-08 Conditions of Approval

Page 5 ends

Plan shall identify the structural and non-structural measures consistent with the City’s adopted requirements.

27. Equipment Screening. All mechanical equipment and vents, ground or rooftop shall be screened from public view. Roof gutters and downspouts are not permitted on the exterior of the building unless integrated into the architecture of the building. In addition, all screening shall be an integral part of the building, details of which shall be provided to the Planning Department for review and approval. Any proposed change shall be reviewed and approved by the Planning Department.

28. Signage. Proposed signs for this development shall require a separate application approval by the Planning Department prior to installation. Furthermore, all signs proposed for this development shall remain in full compliance with all City sign regulations at all times.

29. Utility Lines. All proposed utility lines shall be placed underground.

30. Landscaping. The developer shall submit three (3) copies of construction level Landscape and Irrigation Plans to the Planning Department, accompanied by the appropriate filing fee. The plans shall be prepared by a registered landscape architect and include the location, number, genus, species, and container size of the plants. The cover page shall identify the total square footage of the landscaped area and note how it is to be maintained. Use of water efficient fixtures and drought tolerant plants is encouraged.
a. All landscaping and irrigation systems shall follow Section 17.60 of the Adelanto Municipal Code. Plans will be reviewed and approved by the Planning Department.
b. A minimum of 5% of the project site shall be landscaped, exclusive of areas within the public right-of-way. A minimum of 10% of the employee / customer parking area must be landscaped, in compliance with Table 30-1 in Chapter 17.30 (Manufacturing /Industrial District) of the Municipal Code. c. The developer shall be responsible for planting landscaping in compliance with Section 17.60 of the Adelanto Municipal Code, entitled “Water Conservation/Landscaping Ordinance”, including but not limited to native droughttolerant plants and efficient irrigation systems. Species shall follow Section

17.60.80. 31. Parking. The project shall provide 43 employee / customer parking spaces. All parking spaces and access areas shall meet the City’s requirements.

32. Signed Approval Letter. A signed copy of the City’s approval letter shall be on file with the Planning Department. If ownership of the property or the developer of the property has changed since the original approval or issuance of grading permits, a new copy of the City approval letter shall be signed by the current development parties.

During Construction:
467
LDP 22-08 Conditions of Approval

Page 6 ends

33. Approved Plans. All construction shall be per building permits issued by the Building Department and UBC Standards, and dust control shall be exercised at all times during construction.

34. Dust Control. The applicant shall apply water to the disturbed portions of the project site at least two times per day. On days where wind speeds are sufficient to transport fugitive dust beyond the working area boundary, the applicant shall increase watering to the point that fugitive dust no longer leaves the property (typically a moisture content of 10%), and/or the applicant shall terminate grading and loading operations.

35. Construction Practices. To reduce potential noise and air quality nuisances, the following items shall be listed as “General Notes” on the construction drawings:
a. Construction activity and equipment maintenance is limited to the hours between 7:00 a.m. and dusk on weekdays. Construction may not occur on weekends or State holidays, without prior consent of the Building Official. Non-noise generating activities (e.g. interior painting) are not subject to these restrictions. b. Stationary construction equipment that generates noise in excess of 65 dBA at the project boundaries must be shielded and located at least 100 feet from occupied residences. The equipment area with appropriate acoustic shielding shall be designated on building and grading plans. Equipment and shielding shall remain in the designated location throughout construction activities. c. Construction routes are limited to City of Adelanto designated truck routes. d. Water trucks or sprinkler systems shall be used during clearing, grading, earth moving, excavation, or transportation of cut or fill materials to prevent dust from leaving the site and to create a crust after each day’s activities cease. At a minimum, this would include wetting down such areas in the later morning and after work is completed for the day and whenever wind exceeds 15 miles per hour.
e. A person or persons shall be designated to monitor the dust control program and to order increased watering as necessary to prevent transport of dust off-site. The name and telephone number of such person(s) shall be provided to the City. f. All grading equipment shall be kept in good working order per factory specifications.

36. Construction Activity.
a. The contractor shall provide verification that all construction equipment is in proper tune per the manufacturer’s recommendation.
b. Roll off trash bins and chemical toilets for construction workers shall be required on all construction sites and temporary fencing provided around the construction sites and/or a row of temporary fencing provided at such location as to prevent any building materials from blowing off of the construction site. 468
LDP 22-08 Conditions of Approval

Page 7 ends

c. During those periods when grading is being conducted, the contractor shall inspect the adjacent paved roadways at least two times per week, and shall sweep the street if visible dirt or dust, attributable to the project, can be seen on the roadway.

37. Archeological Resources. If prehistoric or historic resources over 50 years of age are encountered during land modification, then activities in the immediate area of the finds shall be halted so that an archaeologist can assess the find, determine its significance, and make recommendations for appropriate mitigation measures. A historical resources management report shall be submitted by the professional to document the monitoring, to evaluate resource significance and integrity, and if necessary, to evaluate project impacts and propose mitigation measures to mitigate potential adverse impacts. If archeological resources are encountered during grading, ground disturbance activities shall cease so a qualified archeological monitor can evaluate the resources. If discovered resources merit long-term consideration, adequate funding shall be provided to collect, curate and report their resources in accordance with standard archaeological management requirements.

If the City finds that a developer encounters cultural resources and fails to notify the Planning Department, the City will place those responsible for the destruction of historic and archaeologically significant resources on file with the County of San Bernardino and the State of California, Office of Historic Preservation.

38. Paleontological Resources. If paleontological resources are encountered during grading, ground disturbance activities shall cease so a qualified paleontological monitor can evaluate any paleontological resources exposed during the grading activity. If paleontological resources are encountered, adequate funding shall be provided to collect, curate and report on these resources to ensure the values inherent in the resources are adequately characterized and preserved. Collected specimens will be sent to the Earth Sciences Division of the San Bernardino County Museum.

39. Human Remains. If human remains are encountered on the property, then the San Bernardino County Coroner's Office MUST be contacted within 24 hours of the find, and all work halted until a clearance is given by that office and any other involved agencies.

Contact the County Coroner at either 1) 15329 Bonanza Road, Unit 8, Victorville, CA 92392 or (760) 955-8535; or 2) 175 South Lena Road, San Bernardino, CA 92415-0037 or (909) 387-2978.

40. Abandoned Wells. Any abandoned wells on the property or similar structures that might result in groundwater contamination shall be destroyed in a manner approved by the City and San Bernardino County Environmental Health Department.

Prior to Certificate of Occupancy:

41. Landscaping and Irrigation. Landscaping and irrigation shall be consistent with the approved Landscape Plan for the project. The variety of tree to be provided is subject to approval of Planning and Public Works Departments and the trees are to be maintained by the property owner. The Developer shall be responsible for planting landscaping in compliance with Section 17.60 of the Adelanto Municipal Code, entitled “Water Conservation/Landscaping Ordinance”, including but not limited to native drought-tolerant plants and efficient irrigation systems. Species shall be in compliance with Section

17.60.80. Perimeter landscaping pertains to Cassia and Raccoon only and onsite employee parking and building area.
469
LDP 22-08 Conditions of Approval

Page 8 ends

42. Fencing/Walls/Screening. All walls and fences shall be constructed as shown on approved site plan package, stamped 11/2022, presented to the Planning Commission.

CONSERVATION

43. Mandatory Organic Recycling in accordance with AB 1826. Contact Burrtec – Robert Rios ([email protected]) for recycling information.

44. “Saving by Design” Southern California Edison Energy Efficiency – Contact Maya Aubrey [email protected] for electrical efficiency information.

45. For water conservation, use Hydroponics or other low water use irrigation systems. Water should be recycled as much as possible.

ENGINEERING/PUBLIC WORKS DEPARTMENT/BUILDING & SAFETY

46. The Project shall comply with the Revised City Engineer’s Conditions of Approval letter, dated April 30, 2020 and the Building & Safety Conditions letter, dated February 20, 2020.

SAN BERNARDINO COUNTY FIRE DEPARTMENT

47. All conditions of approval specified by the San Bernardino County Fire Department in their approval letter, dated November, 2022, shall be met.

MOJAVE DESERT AIR QUALITY MANAGEMENT DISTRICT (MDAQMD)

48. All conditions and requirements specified by the MDAQMD shall be met. 470
A1.0
SITE PLAN CNM SHEET NUMBER: DRAWN BY: DATE:

PROJECT: THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE PROPERTY OF PRIMIOR INC. ALL DESIGNS AND OTHER INFORMATION ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIED PROJECT AND SHALL NOT BE USED OTHERWISE WITHOUT EXPRESS WRITTEN PRIMIOR INC. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE SHALL BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS. SHOP DETAILS SHALL BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING. COPYRIGHTED 16454 ADELANTO ROAD
ADELANTO, CALIFORNIA 92301
DISTRIBUTION FACILITY 05/13/2022
DATE REMARKS North OVERALL SITE PLAN North North ENLARGED SITE PLAN ENLARGED SITE PLAN

ADELANTO ROAD
HWY 395 6 10 11 10
GATE 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

LEVEL DOCK
LEVEL DOCK (10) DOCK HIGH 1-STORY BUILDING 49,798 S.F.

LEVEL DOCK 33 T TRASH ENCLOSURE 10 11 27 26 25 LEVEL DOCK 6 10 LEVEL DOCK 33 TRASH ENCLOSURE (14) DOCK HIGH GUARD HOUSE GUARD HOUSE 2 1 1 3 2 SITE PLAN NOTES PROPERTY LINE S89° 42' 13" W 724.92' (PER DEED) PROPERTY LINE S89° 42' 13" W 665.65' (PER DEED) PROPERTY LINE N00° 06' 53" W 210.00' (PER DEED) PROPERTY LINE S15° 53' 17" E 218.02' (PER DEED) SITE DATA PARKING: SITE: SITE PLAN GENERAL NOTES: SITE LEGEND BICYCLE SPACES LANDSCAPING:
471
A1.1
SITE PLAN CNM SHEET NUMBER: DRAWN BY: DATE:

PROJECT: THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE PROPERTY OF PRIMIOR INC. ALL DESIGNS AND OTHER INFORMATION ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIED PROJECT AND SHALL NOT BE USED OTHERWISE WITHOUT EXPRESS WRITTEN PRIMIOR INC. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE SHALL BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS. SHOP DETAILS SHALL BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING. COPYRIGHTED 16454 ADELANTO ROAD
ADELANTO, CALIFORNIA 92301
DISTRIBUTION FACILITY 05/13/2022
DATE REMARKS North ENLARGED SITE PLAN North North ENLARGED SITE PLAN ENLARGED SITE PLAN 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 10 DOCK HIGH LEVEL DOCK 45 6 LEVEL DOCK LEVEL DOCK 14 DOCK HIGH SITE PLAN NOTES 472
A2.0
FLOOR PLAN CNM SHEET NUMBER: DRAWN BY: DATE:

PROJECT: THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE PROPERTY OF PRIMIOR INC. ALL DESIGNS AND OTHER INFORMATION ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIED PROJECT AND SHALL NOT BE USED OTHERWISE WITHOUT EXPRESS WRITTEN PRIMIOR INC. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE SHALL BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS. SHOP DETAILS SHALL BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING. COPYRIGHTED 16454 ADELANTO ROAD
ADELANTO, CALIFORNIA 92301
DISTRIBUTION FACILITY 05/13/2022
DATE REMARKS North North ENLARGED FLOOR PLAN ENLARGED FLOOR PLAN North OVERALL FLOOR PLAN 1 3 2 473
A3.0
EXTERIOR ELEVATIONS CNM SHEET NUMBER: DRAWN BY: DATE:

PROJECT: THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE PROPERTY OF PRIMIOR INC. ALL DESIGNS AND OTHER INFORMATION ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIED PROJECT AND SHALL NOT BE USED OTHERWISE WITHOUT EXPRESS WRITTEN PRIMIOR INC. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE SHALL BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS. SHOP DETAILS SHALL BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING. COPYRIGHTED 16454 ADELANTO ROAD
ADELANTO, CALIFORNIA 92301
DISTRIBUTION FACILITY 05/13/2022
DATE REMARKS EXTERIOR BUILDING ELEVATIONS GUARD HOUSE ELEVATIONS EAST ELEVATION - B WEST ELEVATION - C NORTH ELEVATION - A SOUTH ELEVATION - D FENCING ELEVATIONS TRASH ENCLOSURE ELEVATIONS NORTH - A EAST - B SOUTH - C WEST - D NORTH - A EAST - B SOUTH - C WEST - D 12 4 3 EXTERIOR ELEVATION NOTES EXTERIOR FINISH LEGEND 474

ADELANTO ROAD
HWY 395 PROPOSED BUILDING OFFICE PROPOSED SYMBOL BOTANICAL / COMMON NAME SIZE PROPOSED TREES PRELIMINARY PLANTING LEGEND GLEDITSIA TRIACANTHOS F. INERMIS / HONEY LOCUST (THORNLESS) 24" BOX STANDARD ACACIA SMALLII / SWEET ACACIA 24" BOX STANDARD WASHINGTONIA ROBUSTA / MEXICAN FAN PALM 16' BTH STRAIGHT TRUNK PROSOPSIS CHILENSIS / MESQUITE 24" BOX STANDARD CERCIDIUM X. 'DESERT MUSEUM' / DESERT MUSEUM PALO VERDE 24" BOX STANDARD (THORNLESS) SYMBOL BOTANICAL / COMMON NAME SIZE PROPOSED SHRUBS CISTUS PURPUREUS / ORCHID ROCKROSE 5 GAL / 48" O.C. 1 GAL / 42" O.C. 5 GAL / 36" O.C. 1 GAL / 30" O.C. AEONIUM ARBOREUM / TREE AEONIUM ALYOGYNE HUEGELII / BLUE HIBISCUS BACCHARIS 'CENTENNIAL' / CENTENNIAL BACCHARIS CAESALPINEA MEXICANA / MEXICAN BIRD OF PARADISE CALLIANDRA ERIOPHYLLA / FAIRY DUSTER CONVOLVULUS CNEORUM / BUSH MORNING GLORY DALEA GREGGII / TRAILING INDIGO BUSH ENCELIA CALIFORNIA / CALIFORNIA ENCELIA HESPERALOE PARVIFLORA / RED/YELLOW YUCCA SALVIA CLEVELANDII / CLEVELAND SAGE SALVIA LEUCANTHA / MEXICAN SAGE AGAVE ATTENUATA / FOXTAIL AGAVE LEUCOPHYLLUM F. 'GREEN CLOUD' / GREEN CLOUD TEXAS RANGER SALVIA GREGII 'FURHMAN'S RED' / FURHMANS RED SAGE BOUGAINVILLEA 'MONKA' / OO-LA-LA BOUGAINVILLEA CALLISTEMON 'LITTLE JOHN' / DWARF BOTTLE BRUSH 1 GAL / 36" O.C. 1 GAL / 42" O.C. 1 GAL / 24" O.C. 1 GAL / 36" O.C. 1 GAL / 42" O.C. 5 GAL / 48" O.C. 1 GAL / 36" O.C. 1 GAL / 30" O.C. 1 GAL / 36" O.C. 1 GAL / 36" O.C. 1 GAL / 36" O.C. 1 GAL / 30" O.C. 1 GAL / 36" O.C. AGAVE AMERICANA / CENTURY PLANT 5 GAL / 36" O.C.

PRELIMINARY LANDSCAPE PLAN L1.1 SCALE: 1"=20'-0" 0 20 40 60 SHEET NUMBER: DRAWN BY: DATE:

PROJECT: THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE PROPERTY OF PRIMIOR INC. ALL DESIGNS AND OTHER INFORMATION ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIED PROJECT AND SHALL NOT BE USED OTHERWISE WITHOUT EXPRESS WRITTEN PRIMIOR INC. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE SHALL BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS. SHOP DETAILS SHALL BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING. COPYRIGHTED 16454 ADELANTO ROAD
ADELANTO, CALIFORNIA 92301
DISTRIBUTION FACILITY 05/20/2022

DATE REMARKS
(Date)
(Signature) Lic. #5439 Colleen M. Nolan 05.20.2022 Colleen M. Nolan Landscape Architect, #5439 13355 Silverado Court, Corona 92883 [email protected] 714.743.7915 cell GLEDITSIA TRIACANTHOS F. INERMIS /

HONEY LOCUST (THORNLESS)
ACACIA SMALLII / SWEET ACACIA WASHINGTONIA ROBUSTA / MEXICAN FAN PALM PROSOPSIS CHILENSIS / MESQUITE CERCIDIUM X. 'DESERT MUSEUM' / DESERT MUSEUM PALO VERDE (THORNLESS) 475

FM FM FM

SD SD SD SD SD SD SD SD SD SD SD SD SD SD

SD SD SD SD
SD
SD
SD

RESTROOMS ELECTRICAL ELECTRICAL

SHOWERS RESTROOMS TR SS W
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROPOSED WAREHOUSE FF VARIES 2967.36 - 2965.15 (0.5% SLOPE) PROPOSED OFFICE FF = 2966.25 LOADING DOCK LOADING DOCK PROPOSED WAREHOUSE FF = 2967.36 50'
70'
25' 24' 130' 21' 182' 15.5'
60'
10'

5.75' 5.5'
6' 1 1 1 2 16 15 18 18 18 18 17 17 17 17 20 20 20 22 21 3 3 3 3 3 3 15 9 TYP 9 TYP 9 TYP 9 TYP 5 7 6 6 4 4 9 TYP 8 10 13 17 1717 14 19 24 11 TYP 11 TYP 11 TYP 23 23 23 12 12 12 4 TRENCH DRAIN = 2966.15 EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT HWY 395 2425
ADELANTO ROAD SEWER CONNECTION = 2955.55 SEWER CONNECTION = 2956.68 INV = 2963.86 S=0.01 14.5'

65.2'

RESTROOMS ELECTRICAL ELECTRICAL
SHOWERS RESTROOMS TR 2965 2962 2963 2964 2966 2965 2963 2964 2966 2966 2965 2966 2965 2964 2963 2964 2965 2966 2966
2966 PROPOSED WAREHOUSE FF VARIES 2967.36 - 2965.15 (0.5% SLOPE) PROPOSED OFFICE FF = 2966.25 LOADING DOCK LOADING DOCK PROPOSED WAREHOUSE FF = 2967.36 2967 2967 2964 2964 2964 2964 2963 2963 2964 2966 2966 2966 2965 2967
2966 TRENCH DRAIN = 2966.15
HWY 395
ADELANTO ROAD SHEET NUMBER: DRAWN BY: DATE:

PROJECT: THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE PROPERTY OF DAX CONSULTING, INC. ALL DESIGNS AND OTHER INFORMATION ON THE DRAWINGS ARE FOR THE USE ON THE SPECIFIED PROJECT AND SHALL NOT BE USED OTHERWISE WITHOUT EXPRESS WRITTEN DAX CONSULTING, INC. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE SHALL BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS. SHOP DETAILS SHALL BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING. COPYRIGHTED 16454 ADELANTO ROAD
ADELANTO, CALIFORNIA 92301
DISTRIBUTION FACILITY 05/31/2022
DATE REMARKS 2 SCALE: CONCEPT UTILITY PLAN 1" = 30' NORTH 0 U.S. SURVEY FEET 15 30 60 SITE PLAN KEYNOTES NEW BUILDING, UNDER SEPARATE PERMIT. NEW GUARD BUILDING, UNDER SEPARATE PERMIT. INSTALL CURB INLET. INSTALL CLASS D TRAFFIC-RATED TRENCH DRAIN. INSTALL CONTECH CDS UNIT. INSTALL DI2424 JENSEN PRE-CAST CATCH BASIN, MODIFIED FOR CLASS D TRAFFIC-RATING. INSTALL LID SYSTEM. CONNECT ROOF DRAIN TO NEARBY STORM DRAIN. INSTALL SOLID PVC FOR AREA DRAINAGE. GATE PER ARCHITECTURAL PLANS. 8.5' X 18' STANDARD PARKING STALL, TYPICAL. ACCESSIBLE PARKING STALL. CONSTRUCT PEDESTRIAN CURB RAMP. CONSTRUCT DRIVE APRON PER LOCAL STANDARDS. CONSTRUCT CONCRETE SIDEWALK (2% MAXIMUM CROSSLOPE). CONSTRUCT CONCRETE SIDEWALK WITH INTEGRAL CURB AND GUTTER. CONSTRUCT 6" CONCRETE CURB. CONSTRUCT HEAVY DUTY PAVING. TRASH ENCLOSURE PER LOCAL STANDARDS. VEGETATED BIO-SWALE. INSTALL DUPLEX SUMP PUMP AND FORCEMAIN. INSTALL PARKWAY DRAIN PER LOCAL STANDARDS. INSTALL NEW FENCE, SEE ARCHITECTURAL AND LANDSCAPE. INSTALL 6" SEWER LATERAL. INSTALL 3" WATER SERVICE AND METER. EXISTING CONTOUR 1168 PROPOSED CONTOUR LEGEND 1 SCALE: CONCEPT GRADING PLAN 1" = 30' NORTH 0 U.S. SURVEY FEET 15 30 60 VICINITY MAP PRELIMINARY GRADING QUANTITIES #1234567891011121314151617181920212223CUT: 1,190 C.Y. FILL: 4,850 C.Y. NET IMPORT: 3,660 C.Y. ESTIMATED REMOVAL & COMPACTION (TOP 6" ACROSS ENTIRE SITE): 2,400 C.Y. (NOT INCLUDED IN NET VALUE ABOVE) ESTIMATED EXCAVATION FOR UNDERGROUND LID SYSTEM: 1,100 C.Y. (NOT INCLUDED IN NET VALUE ABOVE) NOTES: 1. QUANTITIES SHOWN HEREON ARE FOR COST ESTIMATE PURPOSES ONLY AND SHALL NOT BE USED FOR BIDDING OR CONSTRUCTION PURPOSES. CONTRACTOR IS REQUIRED TO VERIFY ALL QUANTITIES PRIOR TO COMMENCEMENT OF WORK. 2. SEE SOILS REPORT FOR ADDITIONAL INFORMATION AND/OR REQUIREMENTS 3. EARTHWORK CALCULATIONS WERE DERIVED FROM UTILIZING AUTOCAD CIVIL 3D 2022. 4. NO BULKING OR SHRINKAGE HAS BEEN TAKEN INTO ACCOUNT ON THIS SHEET. 5. BUILDING FOOTINGS AND UTILITY TRENCHING SPOILS ARE NOT ACCOUNTED FOR IN THE CALCULATION ABOVE. NORTH C1.0MJP CONCEPT GRADING AND UTILITY PLAN 2425
476

PEARMAIN ST

ADELANTO RD

MONTECITO RD

PRIMROSE RD

IRIS ST

UNNAMED ACRD

EL DORADO ST

CASSIA RD

PANSY RD

PERIWINKLE RD
US 395 HWY
Figure 5
Primior 16454 Adelanto Rd Warehouse CEQA
Existing Land Use and Zoning
Name: 21354 PLAN Fig 5 Existing Land Use and
Zoning.Mxd Print Date: 10/27/2022 12:58:35 PM Author:
pcarlos
Project Location
Proposed Land Use and Zoning
Light Manufacturing (LM)
Mixed Use (MU) (12-18 du/ac)
R-M12
0 150 300 600
Feet
´
477
Project: LDP 22-08
Date: November 16, 2022
1O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P

ENGINEERING DEPARTMENT
General Recordation Conditions:

1. Approval of this project in no manner obligates the City of Adelanto to extend water service, or sewer service, or improve streets, or extend any other infrastructure to service this development.

2. Should Mello-Roos, or Community Facilities Districts, or Community Service Districts, or Assessment Districts, or other special financing districts be formed to provide for City Infrastructure or City Services, this project shall annex into the districts and pay all fees associated with annexation into the districts, and the applicant shall agree to waive the right to protest the formation of said districts.

3. Prior to the approval of any improvement plans and the commencement of any construction associated with the development, the Developer shall be responsible for obtaining all necessary dedications of rights-of-way for offsite infrastructure improvements, right-of-entry for offsite grading, and easements for ingress, egress, drainage, utilities and other legal requirements for impacts associated with the development of this project, as determined and directed by the City Engineer. If the Developer cannot acquire a property interest in property required for off-site improvements, Government Code § 66462.5 shall apply and the City retains the right to:
a. Require the Developer to enter into an agreement to complete the improvements pursuant to Government Code § 66462 at such time as the City acquires an interest in the land that will permit the improvement to be made;
b. Require the Developer to pay the cost of acquiring the offsite real property interests required in connection with the subdivision.

4. The design of all public infrastructure elements shall conform to the requirements of the City General Plan and the current edition of the City’s standard specifications for construction, and any alterations required and approved by the Public Works Department and Engineering Department staff.

5. The following plans and reports shall be prepared by a California licensed civil engineer prior to any site development or disturbance of the natural vegetation of the site. All required plans shall be drawn in ink at an appropriate scale on Mylar sheets, for approval by the City Engineer.

Improvement plans for all of the conditioned improvements shall be submitted to the City and reviewed and approved by the City Engineer. All of the conditioned improvement plans shall be approved by the City Engineer concurrently for review.

Plans Required:
a. Street Improvement Plan/Profile per City requirements, plus Title/Index, Striping and Detail Sheets. Plans to be submitted to the city for plan check and approval.
478
Project: LDP 22-08
Date: November 16, 2022
2O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P b. Precise Grading Plan 1" = 20', A grading plan conforming to the requirements of the Uniform Building Code, appendix 33 1997 edition, shall be prepared and submitted to the City Engineer for approval. c. Water - Plan/Profile at 1" = 40' plus Title/Index and Detail Sheets. Index map on Water improvements Plan shall be a min scale of 1”=100’ and clearly identify Fire Hydrant locations, valves and pipeline locations. d. A Storm Water Pollution Prevention Plan (SWPPP) shall be prepared and approved by the California State Water Quality Control Board prior to the issuance of any permits for grading. The erosion control plan must be submitted to the City for review and approval and must include an active WDID number.
e. Onsite Underground Utility Plan at 1" = 40’ showing the location of all undergrounded utilities including sewers, water, storm drain, gas, electric, telephone, and data and cable television lines. This plan shall be shown schematically based on plans prepared by utility agencies to illustrate the location of any access valves, manholes and hand holes.

Reports Required:
a. Soils Report. A preliminary soils report as prepared by a California licensed geotechnical engineer skilled in soils/foundation investigations shall be submitted for review by the Engineering Department staff along with the first submittal of Street Plans and/or other improvement plans for review. Within the required soils report special attention shall be directed to the rip ability of the proposed road cuts and stability of manufactured slopes. The geotechnical engineer shall determine the setback requirements to support loading without failures in the soil mass. b. Hydrology Report. A detailed drainage plan to the satisfaction of the City Engineer shall be prepared by a licensed Civil Engineer and submitted to the City for approval. The project must accommodate existing drainage flows that impact the project site and impact access to the project site and mitigate offsite drainage that impacts the project. The project must mitigate the increase onsite runoff from pre-development to postdevelopment flows.

6. Proper Security Bonds at prevailing wage costs of the improvements shall be posted with the City for all the conditioned and required improvements that are to be publicly dedicated, including the setting of proper monumentation for the subdivision. Prior to issuance of any permits to construct any improvements, the developer shall enter into an improvement agreement to construct the project improvements per City approved plans and post securities with the City of Adelanto to guarantee completion of construction and payment of labor and materials and one-year warranty of the improvements. These securities shall be provided by the Developers and all assignees and successors to the City.

The following are the required security amounts and release procedure:
479
Project: LDP 22-08
Date: November 16, 2022
3O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P a. The developer shall at all times guarantee performance of this entitlement by furnishing to the City, and maintaining, good and sufficient Security as required by the City on forms approved by City for the purposes and in the amounts as follows:
i. To assure faithful performance of this entitlement in regard to said Improvements in an amount of 100% of the estimated cost of the Improvements; and
ii. To secure payment to any contractor, subcontractor, persons renting equipment, or furnishing labor materials for the Improvements required to be constructed or installed pursuant to this entitlement in the additional amount of 100% of the estimated cost of the Improvements; and
iii. To guarantee or warranty the work done pursuant to this entitlement for a period of one year following Acceptance thereof by City against any defective work or labor done or defective materials furnished in the amount of 20% of the estimated cost of the Improvements.
b. Release of Security. Subject to approval by the City, the Security required by this entitlement shall be released as follows:
i. Security given for faithful performance of any act, obligation, work or agreement shall be released upon Acceptance of the
Improvements, subject to the provisions of subsection (b) hereof. ii. In accordance with the requirements of Government Code Section 64999.7, the City Engineer shall allow a partial release of faithful performance Security pursuant to the following procedures. No partial release of Security for labor and materials shall be allowed.

1. Developer shall have one opportunity to engage in the process of pre-warranty partial release of performance
Security as described in this subsection (b) between the start of work and completion and acceptance of all work on the Improvements. The process allowing for a partial release of performance Security shall occur only when the cost estimate of the remaining work does not exceed
twenty percent (20%) of the total original performance
Security.

2. At such time that the Developer believes that the
obligation to perform the work for which the performance Security was required is complete, the Developer may
notify the City Engineer in writing of the completed work and request a warranty bond walk. This notice shall
include with such notification a written list of work
480
Project: LDP 22-08
Date: November 16, 2022
4O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P completed. Upon receipt of the written notice, the City Engineer shall have twenty (20) business days to review and comment or approve the completion of the required
work. If the City Engineer does not agree that all work has been completed in accordance with the plans and
specifications for the Improvements, he or she shall
supply to the Developer a list of all remaining work to be completed.

General Grading Conditions:

7. Prior to the Issuance of a Grading Permit the following must be completed. a. Native Vegetation Removal Permit & Joshua Tree Survey. Prior to the disturbance of any native indigenous plant life, a Joshua Tree Survey must be performed by the City staff to determine the chances for successful relocation of existing plant life.
b. Grading Plan and SWPPP must be approved by the City Engineer prior to the issuance of the grading permit.

8. During grading operations the following must be observed:
a. All grading for the site shall be confined to the property limits unless the Developer first secures letters of permission to grade across property lines from any affected adjacent property owners.
b. Compaction Report. Any grading and/or utility excavations and backfilling, both on and off site, shall be done under the continuous direction of a licensed geotechnical engineer who shall obtain all required permits and submit progress reports and test results to the Engineering Department staff for review and approval as determined by the City. Upon completion of all soils related work, the geotechnical engineer shall submit a final report to the Engineering Department staff for review and approval, which may require additional tests at the expense of the Developer. i. All soils within street improvements must be compacted to 90% and 95% within twelve inches of surface.
c. No un-bound or re-vegetated soil shall be left exposed to wind erosion. If construction operations have not begun within a short duration then the developer shall immediately provide proper soil erosion management techniques including chemical soil binding and re-vegetation of graded pads, or an equivalent technique approved by the Engineering Department staff.

General Construction Conditions:

9. The City of Adelanto shall be “added insured” on all insurance policies for public improvements construction of this project. Proof of insurance shall be provided prior to start of construction.

10. All monuments shall be referenced or reset in accordance with the Business and Professions Code.
481
Project: LDP 22-08
Date: November 16, 2022
5O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P

11. All improvements shown on the approved plans, as required by the City Engineer, shall be constructed prior to occupancy of any dwelling. All infrastructure improvements required by these conditions of approval, must comply with the City’s standards, Greenbook (latest edition) and any specific requirements established in these conditions of approval. Any existing infrastructure failing to meet these requirements must be removed and reconstructed at the developer’s expense to meet requirements described in these conditions of approval and current City Standards.

12. During construction, temporary pedestrian and traffic control devices shall be constructed as deemed necessary by the City Engineering and Public Works Department staff at locations where construction traffic disrupts normal traffic.

Such measures and devices shall include but are not limited to: flagmen, barricades, portable electric traffic signals and street sweeping.

13. Utility plans must be approved by the City Engineer prior to installation. a. No utility access point, manholes, vaults, or air vents shall be located within sidewalks or pedestrian travel ways or within 12” of curb and gutters.
b. All utilities shall be installed underground to all lots per Public Utilities Commission requirements. No aboveground utility lines shall be permitted within or adjacent to this subdivision for the utilities servicing this project.

All aboveground structures shall be located inside either the City Right-ofWay or a dedicated utility easement and located outside of the pedestrian walkways.

14. Inspection. The Developer shall at all times maintain proper facilities and safe access for by city inspectors and to the businesses or residences wherein any construction work is in progress. Upon completion of the work the Developer shall request a final inspection by the City Engineer.

15. Two paved points of access are required (to allow turn around for the Fire Department) and all terminating paved accesses longer than 150 feet must have proper standard fire turn around or as approved by the Fire Department.

16. Final sections shall be approved by City prior to construction, which shall be submitted along with the soils report & recommendations based on R-value & Traffic Index, and shall substantially conform to the sections submitted with the first submittal of the street improvement plans.

17. Streets shall not be paved until all underground utilities are installed.

18. There shall be no intersecting street centerlines greater than or less than 90° (+/- 10°) degrees unless otherwise approved by the Engineering Department staff.

19. All sidewalks shall have a minimum width of six feet and a minimum unobstructed width of four feet. The location of pedestrian ramps shall be 482
Project: LDP 22-08
Date: November 16, 2022
6O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P determined in accordance with Federal and State laws at the time of construction and shall meet current Federal, State, and Local Americans with Disabilities Act (A.D.A.) standards. Sidewalks, pedestrian ramps and sidewalk/drive approach connections shall be built to current Federal, State, and Local A.D.A. standards.

20. All curb heights and gutter widths shall be based on requirements as set forth by the Hydrology/Hydraulics Report and City Standards and approved by the Engineering Department staff.

21. All covers for utility manholes, valves, and vaults shall be adjusted to final grade after final paving.

22. Street asphalt concrete pavement shall be placed in multiple lifts depending on design asphalt thickness with the final lift placed after the Repair & Replace (R&R) and Point & Patch is completed.

23. Sleeves for lighting and landscape purposes will be allowed in the public street right-of-way when necessary, subject to the approval of the Engineering Department staff.

24. Sewer wyes and laterals shall be installed to the edge of right-of-way in front of all existing structures for existing or proposed sewer mains to City Standards, where street improvements are proposed along said sewer mains.

Street Improvement Conditions:

25. Prior to the issuance of any building permits, the following street dedications and improvements shall be completed. The Developer shall be directly and solely responsible for the mitigation of impacts related to existing traffic levels plus project traffic prior. The Developer shall construct and complete all public street improvements prior to issuance of building permits, or as directed by the City Engineer. Any requirements by City that are in excess of the following street improvement conditions shall govern.

26. All utility tie-ins and other work that disturbs existing public right of way improvements shall be restored per City Encroachment Permit Provisions, or as directed by the Engineering Department staff:
a. Any disturbance of pavement newer than 12 months requires the entire area of the disturbed pavement and the entire width of any travel lane disturbed to be cold-planed (ground down) a tenth of a foot (0.1 feet) and resurfaced with AC, PG 70-10, as directed by the Engineering Department staff.
b. All disturbed sections of pavement that is older than 12 months must be trenched according to City Standards, permanently resurfaced using the minimum of the existing AC plus one (1) inch of AC and six (6) inches of Class II base. The resurfaced areas shall remain in place for a minimum 483
Project: LDP 22-08
Date: November 16, 2022
7O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P of thirty (30) days and a maximum of forty-five (45) days. Then after that period is over, the resurfaced area and the entire width of any travel lane disturbed are to be cold-planed (grinded down) a tenth of a foot (0.1 feet) and resurfaced with AC, PG 70-10, as directed by Engineering Department staff. If this leaves a width less than three (3) feet not being resurfaced on a side then that section must also be resurfaced. c. Any disturbance of existing concrete work shall be considered reconstruction and must meet current A.D.A. standards. Reconstruction must consist of full concrete saw cut panels, as directed by the Engineering Department staff.

27. Developer shall pay the City’s full Circulation Development Impact Fee (Transportation) for the 3.28 acre developed acre that is in place at the time of building permit issuance as a traffic mitigation measures for this project. Credits to this DIF will apply up to maximum calculated fees.

28. The Developer shall design and construct a street lighting system to the requirements of the American National Standard Practice for Roadway Lighting, and as directed by City of Adelanto Public Works/Engineering Department staff along the north side of Cassia Road. This lighting system shall utilize high-pressure sodium vapor lamps.
a. Streetlights shall be energized when installed and maintained by the developer for eighteen months, after which the City of Adelanto shall maintain the lights.
484
Project: LDP 22-08
Date: November 16, 2022
8O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P Traffic Safety:

29. The Developer shall be directly and solely responsible developing a traffic control plan to mitigate the impacts of construction activity to existing traffic.

Traffic control plans are subject to approval to the City Engineer.

30. Street name signs and traffic control devices, including full-width striping and striping transition into existing paving, shall be constructed in accordance with the approved plans and designed per the Manual on Uniform Traffic Control Devices and City Standards at the time of construction as directed by the City Engineer.
a. All signposts shall be installed with anchors when installed into concrete. b. All street name signs shall be installed on 12-inch cap brackets. c. Any sign or post removed by the developer shall be returned to the Street Department undamaged and not vandalized.
d. All striping, onsite and offsite, shall be installed by the developer. This includes “STOP” and stop bars at all “STOP” signs, fog lines and any other traffic safety striping that may apply as directed by the Street Department.
e. Curbs must be painted red 7.5 feet on each side of center in front of all fire hydrants.
f. Curbs must be painted white 7.5 feet on each side of center with 3- minute max stenciled of the curb in front of all mailboxes. g. Each street section shall have a posted speed limit sign as directed by Engineering Department staff.

Sewer Improvements:

31. The applicant shall connect to the City sewer system and pay all associated fees (connection fee, permit fee, inspection fee, etc.) in compliance with the Adelanto Public Utility Authority. The design shall conform to the City adopted sewer master plan and as required by the City Engineer. The sanitary sewer system shall be designed and constructed to collect and convey sewage to the City’s Wastewater Treatment Plant.

Water Improvements:

32. The Developer shall comply with all requirements of the Adelanto Public Utility Authority (APUA).
485
Project: LDP 22-08
Date: November 16, 2022
9O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E P

33. The applicant shall extend APUA water mains to service the project, and shall be responsible for paying all fees associated with said extension, including those fees implemented by Ordinance 4 of the APUA.

34. Water Improvement Design for the project shall conform to the City’s adopted Water Master Plan and per requirements of the City Engineer. All backflow devices shall be installed by the developer.

35. All water valves and vault covers within paved areas shall be raised to finish surface and painted after completion of paving.

36. All fire hydrants, air vacuums and all other above ground water facilities shall be placed within the sidewalk areas while maintaining a clear 4-foot wide pedestrian travel way. Water meter boxes and vaults, valve covers, etc., may be placed within sidewalks or paved areas provided such devices are set flush with finished surfaces as approved by the Engineering Department.

37. A set of water improvement plans shall be submitted to the San Bernardino County Fire Department for comment and review. At the time of the second plan check submittal, water improvement plans with the Fire Departments’ corrections incorporated therein shall be submitted to the City Engineer along with the “redline” commented plans from the Fire Department.

38. Fire protection plans shall be designed per the requirements of the Adelanto Fire Marshall. Fire protection shall include but is not limited to:
a. Fire hydrants shall be spaced no more than 300 feet apart along all street frontages.
b. Fire hydrants shall be set to a level for “safe break away” and easy access, per the Water Department.
c. Blue dot identification on final pavement will be required for all hydrants installed.

Drainage Improvements:

39. The Developer shall prepare a hydrology and hydraulic calculations report to demonstrate that the post development flows proposed to be discharged into and through existing or any other storm drainage facilities do not exceed the maximum flows for which said facilities are designed. This shall be subject to review and approval of the City Engineer. The Hydrology and comprehensive drainage plan must be prepared by a licensed civil engineer to the satisfaction of the City Engineer and the Hydrology Report shall identify offsite flows that impact the proposed development and identify the increased onsite runoff flows. The Study shall address how the proposed development shall accept offsite flows that impact the proposed development and demonstrate how the proposed development will safely pass through the offsite flows while protecting the proposed development and maintaining to all-weather paved points of access to the community. Also, the Study shall 486
Project: LDP 22-08
Date: November 16, 2022
10O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E demonstrate how the proposed development will mitigate post-construction runoff flows per San Bernardino County Flood Control requirements. This study shall substantially conform to the accepted Adelanto Master Plan of Drainage and correlate with the submitted improvement plans. This study shall be engineered using County of San Bernardino Flood Control methodologies and included calculations, maps, diagrams and a written conclusion that contains recommendation of how offsite flows and increased onsite runoff shall be mitigated.
a. The Subdivider or Developer shall be responsible for obtaining all necessary permits and permissions from the department of Fish and Game and from any other regulatory agency for the alterations to any of the watercourses that are impacted by the proposed development. b. All finished building floor elevations shall be 1.0 feet higher than the 100- year base flood elevations.

40. Storm flows may be conveyed in street sections to the extent that right-of-way limits shall accommodate a 100-year storm to a depth less than 0.7 feet deep from the flow line to provide all-weather emergency ingress and egress. If storm flows cannot be adequately conveyed by street sections, underground storm drains and other mitigation measures shall be provided as recommended in the Hydrology/Hydraulics Report and approved by the City Engineer.

41. Prior to construction of any improvements or prior to any land disturbance, the Developer shall construct temporary drainage facilities and establish erosion control practices as necessary to minimize storm runoff and erosion and silt deposition. All construction storm drains, catch basins, the storm water runoff structures shall be provided with adequate capabilities to filter and retain sediment, grit, oil and grease to prevent pollution in storm water runoff, in compliance with the State Water Board Best Management Practices. The Developer shall obtain a National Pollutant Discharge Elimination System (NPDES) General Permit for storm water discharges associated with construction activities, as directed by the California Water Resources Control Board and approved by the Engineering Department staff.

During construction, all NPDES guidelines will be in full force and all Best Management Practices (BMP) shall be followed. For grading of areas greater than 1 acre, a full Storm Water Pollution Prevention Plan (SWPPP) shall be prepared for review and approval by the Regional Water Quality Control Board.

42. The Developer shall provide adequate mitigation for storm drainage to avoid concentrating or increasing offsite flows, subject to review and approval by the City Engineer.

43. A BMP Maintenance Agreement must be prepared for all post-construction BMPs onsite.
487
Project: LDP 22-08
Date: November 16, 2022
11O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E

44. In order to mitigate the drainage impacts of this project the developer shall perform the following:

45. The Developer shall pay the City’s full Drainage Facility Development Impact Fee for the 3.28 acre developed acre that is in place at the time of building permit issuance as a drainage mitigation measures for this project. If the Development Impact Fee collection is deferred from the time of building permit issuance to the time of issuance of the certificate of occupancy, the developer shall pay the Development Impact Fees that are in place at the time of occupancy.

Park and Landscaping:

46. Prior to the grading permit for any phase of development, the Developer shall prepare final improvement plans for the landscaping and irrigation of landscaped areas, and all open spaces. Said plans shall be prepared by a California licensed Landscape Architect and shall be subject to the review and approval of the Engineering and Planning Department staff.

47. A minimum five (5) foot irrigated landscape easement shall be provided between the edge of the sidewalk and the perimeter wall on all surrounding streets.
a. Landscaping shall be at the rate of one (1) tree and six (6) shrubs per 30 linear feet plus such vegetative cover necessary to cover a minimum of forty (40) percent of the total area with shrubs and ground cover.
b. Turf is prohibited within public rights-of-way.
c. Irrigation shall be designed to minimize maintenance and water consumption.
d. All slopes over three feet in height shall be fully landscaped and irrigated.

48. All easements and dedicated Right-of-Way land between the sidewalk and the 8’ high screen fence of the development shall be planted with drought tolerant vegetation and irrigation installed, as approved by the Engineering or Planning Departments. Said landscape easement and landscaped area shall be maintained by the developer. The landscaped area will thereafter be the responsibility of the City upon final acceptance. All sidewalks adjacent to landscaping areas shall have a 6-inch garden curb at the back of the sidewalk between the landscaped area and the sidewalk to prevent runoff across sidewalk.
a. All plant spacing shall be approved by the Engineering Department and Title 17.

Onsite Improvements:

55. The tops of all cut slopes shall be in conformance with City Standards per the City Engineer. Retaining walls shall be utilized where required by 488
Project: LDP 22-08
Date: November 16, 2022
12O:\Planning\Projects\Location & Development Plans\LDP 2022\LDP 22-08 Primor_APN-3128-231-04\PC HRG 11-16\ATTACHMENT E Public Works Department staff to ensure that unusable and nonvisible slopes are not created.

56. No lot shall drain onto any property adjacent to the project. Lots shall be protected from storm runoff as approved by the Public Works Department staff.

57. All onsite employee / customer parking lot areas must be on an impervious surface, asphalt or concrete, and shall be based on an RValue conducted by a competent soils testing laboratory and Traffic Index acceptable to the City Engineer. This requirements Does not apply to vehicle storage area.

58. Post-construction BMPs shall be required per the Construction General Permit (CGP).
489

Statutory Exemptions. State code number:

_______________________________________________
Print Form
Notice of Exemption Appendix E
To: Office of Planning and Research From: (Public Agency): ____________________________ P.O. Box 3044, Room 113 _______________________________________________ Sacramento, CA 95812-3044 County Clerk
(Address)
___________________________
___________________________
County of: __________________
Project Title: ____________________________________________________________________________ Project Applicant: ________________________________________________________________________ Project Location - Specific:

Project Location - City: ______________________ Project Location - County:

Description of Nature, Purpose and Beneficiaries of Project:
_____________________
Name of Public Agency Approving Project: _____________________________________________________ Name of Person or Agency Carrying Out Project: ________________________________________________ Exempt Status: (check one):

Ministerial (Sec. 21080(b)(1); 15268);
Declared Emergency (Sec. 21080(b)(3); 15269(a));
Emergency Project (Sec. 21080(b)(4); 15269(b)(c));
Reasons why project is exempt:

Lead Agency
Contact Person: ____________________________ Area Code/Telephone/Extension: _______________ If filed by applicant:

1. Attach certified document of exemption finding.

2. Has a Notice of Exemption been filed by the public agency approving the project? Yes No Signature: ____________________________ Date:

Signed by Lead Agency Signed by Applicant
Authority cited: Sections 21083 and 21110, Public Resources Code. Date Received for filing at OPR:

Reference: Sections 21108, 21152, and 21152.1, Public Resources Code. _______________
Categorical Exemption. State type and section number: ____________________________________ ______________________________________________
______________ Title: _______________________
Revised 2011
490
Applicability of Exempt Status:

The following are findings to support a Class 32 Categorical Exemption (In-Fill Development Project). The Project would be consistent with this exemption and as further described below, no exceptions to this exemption would apply.
15332. In-Fill Development Projects
Class 32 consists of projects characterized as in-fill development meeting the conditions described in this section.
(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses.
(c) The project site has no value as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.

The Project consists of the construction and operation of a warehouse facility located in the Light Manufacturing (LM) zone and land use of the City. The Project would be consistent with the permitted uses as part of the zoning regulations. The Project would require a Location and Development Permit (LDP). An Initial Study was prepared to evaluate all potential impacts associated with implementation of the Proposed Project and concluded that the Project would have no impact, or impacts would be less than significant for all resource areas. The Initial Study is included below for reference. An analysis based on consistency with the conditions listed as part of the Class 32 exemptions is provided below:
(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.

The Project will be located in the LM zone and land use of the City. LM zones allows for limited manufacturing and warehousing. The Project will construct and operate a distribution facility which will be consistent with the permitted uses of the LM zone. Furthermore, existing LM uses are directly east of the Project site in an area of the City known as ‘Light Manufacturing District East’. Therefore, the Project will be consistent with applicable general plan and zoning designations. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses.

The Project site is approximately a 3.17-acre parcel located within the City limits with urban uses surrounding the site. Immediately north of the site is a single-story self storage facility and immediately south of the site is a single-story self storage facility. US-395 Highway is located directly west. The Project would be in between these existing self-storage facilities. (c) The project site has no value as habitat for endangered, rare or threatened species.

A Biological Resources Reconnaissance Assessment was prepared for the Project. The results of the assessment show that the Project site does not contain any valuable habitats for endangered, rare, or threatened species. There were no special status species observed during the reconnaissance-level survey and are considered absent due to the lack of suitable habitat within the survey area which consists of a 491
five-mile radius from the Project site. As concluded in the Initial Study below, the Project site does not have value as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.

An Air Quality, Energy, and Greenhouse Gas Emissions Impact Analysis, and VMT Analysis, were prepared for the Project. Additionally, impacts to noise and water quality were evaluated in the Initial Study. As concluded in the Initial Study below, the Project would not have a significant impact on traffic, noise, air quality, or water quality.
(e) The site can be adequately served by all required utilities and public services.

The Project will connect to existing utility connections along Adelanto Road for water, wastewater, electric power, and natural gas. Development of the warehouse facility would require installation of telecommunication services, including wireless internet service and phone service. This can be accomplished through connection to existing services that are available to the developer at the Project site. As concluded in the Initial Study below, the Project would not have a significant impact on any utilities or public services.
15300.2. Exceptions
(a) Location. Classes 3, 4, 5, 6, and 11 are qualified by consideration of where the project is to be located —a project that is ordinarily insignificant in its impact on the environment may in a particularly sensitive environment be significant. Therefore, these classes are considered to apply all instances, except where the project may impact on an environmental resource of hazardous or critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies.

The Project is not exempt under Class 3, 4, 5, 6, or 11. The Project is conversion of a vacant lot to a warehouse facility. The proposed Project is not located in an area that would impact on an environmental resource of hazardous or critical concern where designated, precisely mapped, or officially adopted pursuant to law by federal, state, or local agencies. (b) Cumulative Impact. All exemptions for these classes are inapplicable when the cumulative impact of successive projects of the same type in the same place, over time is significant.

The Project includes construction of a warehouse facility. The Project would not contribute to a significant cumulative impact because the Project would be consistent with the City’s zoning regulations and General Plan. The Project would be required to comply with all applicable City ordinances, regulations, and permitting conditions. Furthermore, since the Project would not contribute to any individual significant impacts, a cumulatively considerable impact would not occur.
(c) Significant Effect. A categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances.

The Project will construct a warehouse facility on a parcel zoned for LM purposes. The construction and operation of the Project would not create a significant effect due to an unusual 492
circumstance since the Project would be a permitted use and would be consistent with the proposed land use and zoning surrounding the Project site. The Project site is not located on a property with unique characteristics that could result in a significant impact to the environment based on the discussions above and below related to air quality, threatened or endangered species, historical resources, hazardous wastes, traffic, and availability of utilities and public services.
(d) Scenic Highways. A categorical exemption shall not be used for a project which may result in damage to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar resources, within a highway officially designated as a state scenic highway. This does not apply to improvements which are required as mitigation by an adopted negative declaration or certified EIR.

The Project site does not contain any scenic vistas or scenic features and is not located along a state scenic highway. The proposed Project is in a relatively urbanized area with little development in the immediate vicinity of the Project beyond existing self storage facilities to the north and south of the Project.
(e) Hazardous Waste Sites. A categorical exemption shall not be used for a project located on a site which is included on any list compiled pursuant to Section 65962.5 of the Government Code.

The Project will not be located on a site that is included on a list of hazardous materials sites that are currently under remediation. According to the California State’s GeoTracker and Envirostor website (consistent with Government Code Section 65962.5), which provides information regarding Leaking Underground Storage Tanks (LUST), there are no active LUST sites located within the Project site, or within a 1,000-foot radius of the site. (f) Historical Resources. A categorical exemption shall not be used for a project which may cause a substantial adverse change in the significance of a historical resource.

A Cultural Resource Survey and Report was prepared for the Project. The assessment included a cultural resources records search, literature review and research, and field survey of the Project site. Results from the survey and records search indicated that no previously recorded historic cultural resources have been documented within the proposed Project site. During the pedestrian survey, no previously undiscovered resources were discovered. As concluded in the Initial Study below, implementation of the Project would not cause a substantial adverse change in the significant of a historical resource.
493
16454 ADELANTO WAREHOUSE PROJECT

INITIAL STUDY
Adelanto, CA
Prepared for:

CITY OF ADELANTO PLANNING DIVISION
11600 Air Expressway
Adelanto, California, 92301
Prepared by:

CHAMBERS GROUP, INC.
5 Hutton Centre Drive, Suite 750
Santa Ana, California 92707
(949) 261-5414
November 2022
494
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
ii

TABLE OF CONTENTS
Page
SECTION 1.0 – PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING................................................ 6

1.1 PROJECT TITLE............................................................................................................................... 6

1.2 LEAD AGENCY ............................................................................................................................... 6

1.3 CONTACT PERSON AND PHONE NUMBER.................................................................................... 6

1.4 PROJECT LOCATION ...................................................................................................................... 6

1.5 PROJECT SPONSOR’S NAME AND ADDRESS ................................................................................. 6

1.6 GENERAL PLAN DESIGNATION...................................................................................................... 6

1.7 ZONING......................................................................................................................................... 6

1.8 DESCRIPTION OF PROJECT............................................................................................................ 7

1.8.1 Building Characteristics.................................................................................................... 7

1.8.2 Landscaping...................................................................................................................... 7

1.8.3 Parking, Circulation and Site Access ................................................................................ 7

1.8.4 Utilities............................................................................................................................. 7

1.8.5 Construction..................................................................................................................... 7

1.8.6 Operation ......................................................................................................................... 8

1.9 SURROUNDING LAND USES AND SETTING ................................................................................... 8 SECTION 2.0 – EVALUATION OF ENVIRONMENTAL IMPACTS .............................................................. 14 SECTION 3.0 – CHECKLIST OF ENVIRONMENTAL ISSUES...................................................................... 16

3.1 AESTHETICS................................................................................................................................. 16

3.1.1 Impact Analysis .............................................................................................................. 16

3.2 AGRICULTURE & FORESTRY RESOURCES .................................................................................... 18

3.2.1 Impact Analysis .............................................................................................................. 18

3.3 AIR QUALITY................................................................................................................................ 19

3.3.1 Environmental Setting ................................................................................................... 20

3.3.2 Impact Analysis .............................................................................................................. 22

3.4 BIOLOGICAL RESOURCES ............................................................................................................ 26

3.4.1 Environmental Setting ................................................................................................... 26

3.4.2 Impact Analysis .............................................................................................................. 27

3.5 CULTURAL RESOURCES ............................................................................................................... 29

3.5.1 Environmental Setting ................................................................................................... 29

3.5.2 Impact Analysis .............................................................................................................. 30

3.6 ENERGY ....................................................................................................................................... 32

3.6.1 Environmental Setting ................................................................................................... 32

3.6.2 Impact Analysis .............................................................................................................. 33

3.7 GEOLOGY AND SOILS .................................................................................................................. 38

3.7.1 Environmental Setting ................................................................................................... 39

3.7.2 Impact Analysis .............................................................................................................. 39 495
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
iii

3.8 GREENHOUSE GAS EMISSIONS ................................................................................................... 43

3.8.1 Environmental Setting ................................................................................................... 43

3.8.2 Impact Analysis .............................................................................................................. 44

3.9 HAZARDS AND HAZARDOUS MATERIALS ................................................................................... 46

3.9.1 Impact Analysis .............................................................................................................. 47

3.10 HYDROLOGY AND WATER QUALITY............................................................................................ 50

3.10.1 Impact Analysis .............................................................................................................. 50

3.11 LAND USE AND PLANNING ......................................................................................................... 53

3.11.1 Impact Analysis .............................................................................................................. 53

3.12 MINERAL RESOURCES ................................................................................................................. 59

3.12.1 Impact Analysis .............................................................................................................. 59

3.13 NOISE .......................................................................................................................................... 59

3.13.1 Environmental Setting ................................................................................................... 60

3.13.2 Impact Analysis .............................................................................................................. 60

3.14 POPULATION AND HOUSING...................................................................................................... 63

3.14.1 Impact Analysis .............................................................................................................. 63

3.15 PUBLIC SERVICES......................................................................................................................... 64

3.15.1 Impact Analysis .............................................................................................................. 64

3.16 RECREATION ............................................................................................................................... 66

3.16.1 Impact Analysis .............................................................................................................. 66

3.17 TRANSPORTATION...................................................................................................................... 66

3.17.1 Environmental Setting ................................................................................................... 67

3.17.2 Impact Analysis .............................................................................................................. 67

3.18 TRIBAL CULTURAL RESOURCES................................................................................................... 69

3.18.1 Environmental Setting ................................................................................................... 69

3.18.2 Impact Analysis .............................................................................................................. 70

3.19 UTILITIES AND SERVICE SYSTEMS ............................................................................................... 71

3.19.1 Impact Analysis .............................................................................................................. 72

3.20 WILDFIRE .................................................................................................................................... 75

3.20.1 Impact Analysis .............................................................................................................. 75

3.21 MANDATORY FINDINGS OF SIGNIFICANCE................................................................................. 76

3.21.1 Impact Analysis .............................................................................................................. 76 SECTION 4.0 – REFERENCES ................................................................................................................ 78 496
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
iv
APPENDIX A Air Quality, Energy, and Greenhouse Gas Emissions Impact Analysis for 16454 Adelanto Road Warehouse Distribution Facility Project prepared by Vista Environmental, August 17, 2022. Revised October 28,2022.

APPENDIX B Biological Resources Reconnaissance Assessment for the 16454 Adelanto Road Warehouse Distribution Facility Project prepared by Chambers Group, June 6, 2022.

APPENDIX C Cultural Resources Study Letter Report for the 16454 Adelanto Road Warehouse Distribution Facility, prepared by Chambers Group, August 25, 2022. Updated October 27, 2022.

APPENDIX D Vehicle Miles Traveled (VMT) Analysis – 16454 Adelanto Road Warehouse, prepared by General Technologies and Solutions (GTS), May 16, 2022; Updated October 27, 2022. 497
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
v

LIST OF TABLES
Page
Table 3.3-1. Mojave Desert Air Basin Attainment Status............................................................................................20 Table 3.3-2. MDAQMD Significant Emissions Thresholds............................................................................................21 Table 3.3-3. Construction-Related Air Pollutant Emissions.........................................................................................23 Table 3.3-4. Operations-Related Air Pollutant Emissions............................................................................................23 Table 3.6-1. Proposed Project Compliance with Applicable General Plan Energy Policies .........................................36 Table 3.8-1. MDAQMD Significant Emissions Threshold for Greenhouse Gases.........................................................44 Table 3.8-2. Project Related Greenhouse Gas Annual Emissions................................................................................45 Table 3.11-1. Land Use and Community Design Policies Consistency Analysis...........................................................54 Table 3.13-1 Noise Levels of Construction Equipment at 25, 50, and 100 Feet (in dBA Leq) from the Source...........61 Table 3.17 -1. VMT Analysis Results............................................................................................................................68

LIST OF FIGURES
Page
Figure 1 - Project Vicinity Map ......................................................................................................................................9 Figure 2 – Existing Project Site and Surrounding Photos.............................................................................................10 Figure 3 – Overall Site Plan..........................................................................................................................................11 Figure 4 – Exterior Building Elevations........................................................................................................................12 Figure 5 – Proposed Land Use and Zoning ..................................................................................................................11 498
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
6 SECTION 1.0 – PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING

1.1 PROJECT TITLE
16454 Adelanto Road Warehouse Distribution Facility

1.2 LEAD AGENCY
City of Adelanto
11600 Air Expressway
Adelanto, California 92301

1.3 CONTACT PERSON AND PHONE NUMBER
James Hirsch, Contract Planner
[email protected]
760-246-2300 ext. 11190

1.4 PROJECT LOCATION
The Project site is a mostly vacant, 3.17-acre parcel located at 16454 Adelanto Road in the City of Adelanto (City) in San Bernardino County, California (Project site, Figure 1). The Project site’s Assessor Parcel Number (APN) is 3128-231-04. The site has a land use designation and zoning of Light Manufacturing (LM).

Access to the site is currently available via a private driveway along Adelanto Road. Existing on the site is a vacant manufactured commercial building, an iron fence, and two concrete slabs, including a designated parking area. Beginning at the eastern entrance gate, and surrounding the parking slab, is a slightly dispersed layering of 1-4-inch sized rip rap gravel. There are also multiple imported pine trees separating the building and parking slab. Located to the west of the building are two Conex boxes. The site contains minimal vegetation. Photographs of existing conditions on and surrounding the Project site are shown in Figure 2. The elevation at the Project site is approximately 2,871 feet above mean sea level (amsl).

1.5 PROJECT SPONSOR’S NAME AND ADDRESS
Applicant: Chuck Minyard
Primior Development
750 North Diamon Bar Boulevard
Diamond Bar, California 91765

1.6 GENERAL PLAN DESIGNATION
Light Manufacturing (LM)

1.7 ZONING
Light Manufacturing (LM)
499
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
7 1.8 DESCRIPTION OF PROJECT
The City of Adelanto is located in the High Desert region of San Bernardino County, just north of the San Gabriel Mountains. The proposed Project involves grading the vacant site and construction and operation of a single-story, 49,798-square-foot (sq. ft.) warehouse distribution facility (proposed Project). The facility would have 27 loading docks; three at level height and 24 at dock height. The proposed Project would also contain offices, four restrooms, two shower rooms, a break room, a guard house, and a trash enclosure. The Project site would contain 43 parking spaces, including two Americans with Disabilities Act (ADA)-compliant parking spaces. The majority of the parking and facility would be contained behind a security gate that would be operated by the staff in the guard house. An underground detention system would be used in the drive aisle to help with offsite flows. The overall site plan is shown in Figure 3 and the exterior building elevations are shown in Figure 4.

The existing mobile building and other various equipment would be removed from the site. The Project is an allowed use under the existing LM zoning, as shown in Figure 5.

1.8.1 Building Characteristics
The proposed building would be prefabricated before arriving to the site, utilize approximately 37.6 percent of the site, and occupy approximately 49,798 square feet with a floor to area ratio of 0.37. The Project would have a maximum elevation of 38 feet 4 inches.

1.8.2 Landscaping
Landscaping would be consistent with desert type species and would be low water requirement with minimal irrigation. Landscaping would surround the site and occupy approximately 10.85% of the parcel.

1.8.3 Parking, Circulation and Site Access
Regional access to the Project site is provided by the US‐395 Highway at the Project site and Holly Road approximately 0.4 miles south of the Project site. The north‐south roadway of Adelanto Road and the east‐west roadway of Holly Road provide local circulation. The existing driveway off of Adelanto Road would be utilized as the main entrance for the Project. A minimum driveway width of 50 feet would be provided for throughout the Project site, and a turnaround would be located at the back of the building.

The proposed Project would provide a total of 43 parking spaces, including two accessible spaces.

1.8.4 Utilities
Water and sewer service would be provided to the Project site by Adelanto Water District (AWD).

Electricity would be provided by Southern California Edison and gas would be provided by Southwest Gas Company. Utilities would tie into nearby connections along Adelanto Road. Water would be needed for the break room, restrooms, shower rooms, and landscaping.

1.8.5 Construction
Project construction is expected to begin in January 2023 and is assumed to last 6 months. Project construction would include site preparation, grading, building construction, paving, and architectural 500
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
8 coating phases. Expected equipment would include excavators, backhoes, cranes, forklift, and bobcat. The Project would require 1,1,90 cubic yards of cut and 4,850 cubic yards of fill, resulting in an import total of 3,660 cubic yards. The final grading quantities will be confirmed during plan check.

Water during construction would be used for dust suppression and would be brought to the site with a water truck. Up to 30 construction workers per day would be onsite during the construction phase and it is anticipated that they come from the local work force. Construction activities would occur from 7:00 a.m. to dusk, in compliance with the City Municipal Code.

1.8.6 Operation
The facility would likely be staffed 14 hours a day (Monday through Friday) from approximately 7:00 A.M. until 9:00 PM, and would be operated with approximately 20 employees including those in the guard shack provided onsite. LED lighting would be provided at night for security purposes and would comply with the City lighting requirements. Approximately 15 truck trips would be completed per working day.

The site would allow for delivery and export of auto parts, and electrical and fork-lift parts. No cooling or cold storage would be required.

1.9 SURROUNDING LAND USES AND SETTING
Surrounding the Project site are the following uses and designations:

North: Mixed Use land use and zoning designation. Immediately north of the site is a single-story self storage facility followed by vacant land and various commercial uses.

South: Mixed Use land use and zoning designation. Immediately south of the site is a single-story self storage facility followed by vacant land.

East: Light Manufacturing land use and zoning designation. Adelanto Road is bordering the site. Vacant land is on the other side of the Adelanto Road, with manufacturing uses, including northwest pipe company scattered throughout.

West: Medium Density Residential land use and zoning designation. US-395 Highway is located directly west of the Project site, followed by vacant land.
501
£¤395
San
Bernardino
Kern
Ventura
Riverside Orange
Imperial
Los Angeles
San Diego
1:24,000 1:5,000,000
Figure 1
Primior 16454 Adelanto Rd Warehouse CEQA
Project Location and Vicinity
Name: 21354 PLAN Fig 1 Project Location and Vicinity.Mxd Print Date: 4/15/2022 9:50:07 AM Author: pcarlos
0 30 60 120
Feet
´
")
Project Location
Project Location
Adalanto Road
502
Figure 2
Primior 16454 Adelanto Rd Warehouse CEQA
Site Photos
Name: 21354 PLAN Fig 2 Site Photos.Mxd
Print Date: 4/20/2022 2:32:37 PM Author: pcarlos
Photo 1 Photo 2
Photo 3 Photo 4
503
F
igure3
Primior16454AdelantoRdWarehouseCEQA
OverallSitePlan
04080160
Feet
Name:21354PLANFig3OverallSitePlan.Mxd
PrintDate:4/20/202212:22:18PMAuthor:pcarlos
´
504
Figure 4
Primior 16454 Adelanto Rd Warehouse CEQA
Exterior Building Elevations
Name: 21354 PLAN Fig 4 Exterior Building Elevations.Mxd Print Date: 4/20/2022 1:25:55 PM Author: pcarlos
505

PEARMAIN ST

ADELANTO RD

MONTECITO RD

PRIMROSE RD

IRIS ST

UNNAMED ACRD

EL DORADO ST

CASSIA RD

PANSY RD

PERIWINKLE RD
US 395 HWY
Figure 5
Primior 16454 Adelanto Rd Warehouse CEQA
Existing Land Use and Zoning
Name: 21354 PLAN Fig 5 Existing Land Use and
Zoning.Mxd Print Date: 10/27/2022 12:58:35 PM Author:
pcarlos
Project Location
Proposed Land Use and Zoning
Light Manufacturing (LM)
Mixed Use (MU) (12-18 du/ac)
R-M12
0 150 300 600
Feet
´
506
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
14 SECTION 2.0– EVALUATION OF ENVIRONMENTAL IMPACTS

1. A brief explanation is required for all answers except “No Impact” answers that are adequately supported by the information sources a lead agency cites. A “No Impact” answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A “No Impact” answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).

2. All answers must take account of the whole action involved, including offsite as well as onsite, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.

3. Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. “Potentially Significant Impact” is appropriate if substantial evidence exists that an effect may be significant. If one or more “Potentially Significant Impact” entries are marked when the determination is made, an EIR is required.

4. “Negative Declaration: Less Than Significant With Mitigation Incorporated” applies where the incorporation of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.” The lead agency must describe the mitigation measures and briefly explain how they reduce the effect to a less than significant level (mitigation measures from earlier analyses may be cross-referenced).

5. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D).

In this case, a brief discussion should identify the following:
a. Earlier Analysis Used. Identify and state where they are available for review. b. Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis.
c. Mitigation Measures. For effects that are “Less than Significant with Mitigation Measures Incorporated,” describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project.

6. Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated.

7. Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 507
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
15 8. The explanation of each issue should identify:
a. the significance criteria or threshold, if any, used to evaluate each question; and b. the mitigation measure identified, if any, to reduce the impact to less than significant. *Note: Instructions may be omitted from final document. 508
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
16 SECTION 3.0 – CHECKLIST OF ENVIRONMENTAL ISSUES

3.1 AESTHETICS

1. AESTHETICS.

Except as provided in Public Resources Code
Section 21099, would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Have a substantial adverse effect on a scenic vista? (b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic
buildings within a state scenic highway?
(c) In non-urbanized areas, substantially degrade the
existing visual character or quality of public views of the site and its surroundings? (Public views are those
that are experienced from publicly accessible
vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and
other regulations governing scenic quality?
(d) Create a new source of substantial light or glare
which would adversely affect day or nighttime views
in the area?

3.1.1 Impact Analysis
a) Would the project have a substantial adverse effect on a scenic vista? Less than Significant Impact. Adverse impacts to scenic vistas can occur in one of two ways. First, an area itself may contain existing scenic vistas that would be altered by new development. A review of the Project area determined that there are no scenic vistas located internally within the area proposed for the development of the Project. The Project site is located in an area that is sparsely developed, with existing warehouses to the north and south, the US-395 to the west of the site, and no other surrounding development in the immediate vicinity of the Project. The nearest residences are more than a half mile south of the Project site. Therefore, the development of the Project is not expected to impact any important scenic vistas within the Project area.

A scenic vista impact can also occur when a scenic vista can be viewed from the Project area or immediate vicinity and a proposed development may interfere with the view to a scenic vista. The City of Adelanto is located in the High Desert, north of the San Bernardino and San Gabriel Mountains and east of the Shadow Mountains. The Adelanto North 2035 Comprehensively Sustainable Plan states the following in regard to scenic corridors and viewsheds:

Scenic Corridors and Viewsheds. The Adelanto North 2035 Planning Area is comprised of a vast amount of vacant/open space land that has scenic value. These resources include the beauty of the desert landscape and the views of the Shadow Mountains along the western boundary of the Planning Area. Sensitive design and placement of new development will ensure that these corridors and viewsheds remain as an important aesthetic resource for future residents of the City as well as travelers passing through.
509
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
17 The proposed Project would construct a pre-fabricated building that would have a maximum height of 38 feet and 4 inches; similar to the developments directly north and south of the Project site. While development of the site may limit views in the area immediately surrounding the site, the existing surrounding development and proposed height of the building would limit any potential impacts.

Additionally, given the Project’s location—more than 16 miles southeast of the Shadow Mountains, and more than 15 miles north of the San Gabriel Mountains—views to the mountains from the Project area are limited. Therefore, development of the proposed Project would have a less than significant impact on a scenic vista.
b) Would the project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? No Impact. No rock outcroppings, or other scenic features existing on site. According to Caltrans, the proposed Project is not located within a state scenic highway and the City of Adelanto does not identify any locally important scenic roadways (Caltrans 2022). Therefore, the proposed Project will not affect any scenic resources within a state scenic highway corridor. Additionally, based on the site condition and immediate surroundings, the Project site itself does not contain any significant scenic resources, and therefore no impact would occur.
c) Would the project, in non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less than Significant Impact. The proposed Project is in a relatively urbanized area with little development in the immediate vicinity of the Project beyond existing self storage facilitiesto the north and south of the Project. As previously mentioned, the proposed Project would construct a prefabricated building that would have a maximum height of 38 feet and 4 inches; similar to the developments directly north and south of the Project site. However, the Project site is located more than 16 miles southeast of the Shadow Mountains, and more than 15 miles north of the San Gabriel Mountains, and as such, public views to these vistas in the area surrounding the Project, are limited.

While the visual characteristics of the existing uses would change, it would be largely similar to existing and surrounding uses. Therefore, the Project would not result in the loss of distinct or valuable visual characteristics of the site and surroundings. The Project would result in a less-than significant impact d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Less than Significant Impact. Implementation of the proposed Project will require LED lighting for security purposes which will create new sources of light during the operational phases of the Project.

However, the proposed Project would be located between two similar uses buildings and the freeway, both of which contain existing sources of lighting and glare. Furthermore, the new lighting would be consistent with the lighting policies of the City’s zoning code standards by directing all lighting downwards. With compliance with the City’s code, potential light and glare will be controlled to a less than significant impact level.
510
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
18 3.2 AGRICULTURE & FORESTRY RESOURCES

2. AGRICULTURE & FOREST RESOURCES.
(In determining whether impacts to agricultural
resources are significant environmental effects,
lead agencies may refer to the California
Agricultural Land Evaluation and Site Assessment
Model (1997) prepared by the California
Department of Conservation as an optional model
to use in assessing impacts on agriculture and
farmland. In determining whether impacts to
forest resources, including timberland, are
significant environmental effects, lead agencies
may refer to information compiled by the
California Department of Forestry and Fire
Protection regarding the state’s inventory of forest
land, including the Forest and Range Assessment
Project and the Forest Legacy Assessment project;
and forest carbon measurement methodology
provided in Forest Protocols adopted by the
California Air Resources Board. Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural
use?
(b) Conflict with existing zoning for agricultural use, or a Williamson Act contract?
(c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
section 12220(g)), timberland (as defined by Public
Resources Code section 4526), or timberland zoned
Timberland Production (as defined by Government
Code section 51104(g))?
(d) Result in the loss of forest land or conversion of
forest land to non-forest use?
(e) Involve other changes in the existing environment
which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or
the conversion of forest land to non-forest use?

3.2.1 Impact Analysis
a) Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact. The City of Adelanto does not contain a significant amount of land designated as Prime Farmland, Unique Farmland or Farmland of Statewide Importance. The Project site is classified as urban and built up land (DOC 2022a). This designation is not related to Prime Farmland, Unique Farmland or Farmland of Statewide Importance. Furthermore, the Project site is not currently used for agricultural purposes. Construction and operation of the proposed warehouse facility, will be 511
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
19 confined to the Project site, and would not convert farmland of any importance to non-agricultural use. No impacts would occur.
b) Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact. The Project site is currently zoned LM and will not involve agricultural uses. While the DOC no longer hosts Williamson Act enrollment maps and/or data ‘due to the lack of up to date city and county reported enrollment data’ (DOC 2022b), the City has indicated that no Williamson Act contracts located within the City. Therefore, no potential exists for a conflict between the proposed Project and agricultural zoning or Williamson Act contracts. No impacts would occur. c) Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?
d) Would the project result in the loss of forest land or conversion of forest land to non-forest use? No Impact. As previously mentioned, the Project site is currently zoned LM, which does not contain forestry uses. The Project site is not located within forest land, timberland or timberland zoned for Timberland Production and does not contain any commercial trees. Therefore, the proposed Project will not conflict with existing zoning for, or cause rezoning of, forest land, timberland, or timberland zoned Timberland Production or convert any forest land to a non-forest use and no impacts would occur.
e) Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or the conversion of forest land to non-forest use?
No Impact. Implementation of the proposed Project will not involve other changes in the existing environment, which, due to their location or nature, could result in conversion of valuable farmland to non-agricultural use or forest to non-forest uses. No forest or agricultural resources or uses occur within the general vicinity of the proposed Project site, and as such no agricultural uses would be impacted by the development or operation of the Project. Therefore, no impacts to agricultural, forest or timberland resources will result from Project implementation.

3.3 AIR QUALITY

3. AIR QUALITY.

Where available, the significance criteria
established by the applicable air quality
management district or air pollution control
district may be relied upon to make the following
determinations. Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Conflict with or obstruct implementation of the
applicable air quality plan?
(b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is
non-attainment under an applicable federal or state
ambient air quality standard?
512
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
20 (c) Expose sensitive receptors to substantial pollutant concentrations?
(d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of
people?

3.3.1 Environmental Setting
An Air Quality, Energy, and Greenhouse Gas Analysis was prepared for the proposed Project and is included in Appendix A. The results of the analysis are summarized below. The Project site is located within the San Bernardino County portion of the Mojave Desert Air Basin (MDAB), which is an assemblage of mountain ranges interspersed with long broad valleys that often contain dry lakes. The Project site is located within the Victor Valley portion of the Mojave Desert. Hot summers, mild winters, infrequent rainfall, moderate afternoon breezes and generally fair weather characterize the climate of the Victor Valley, which is an interior sub‐climate of Southern California’s Mediterranean climate.

Air Quality Standards
Air pollutants are generally classified as either criteria pollutants or non-criteria pollutants. Federal ambient air quality standards have been established for criteria pollutants, whereas no ambient standards have been established for non-criteria pollutants. For some criteria pollutants, separate standards have been set for different periods. Most standards have been set to protect public health. For some pollutants, standards have been based on other values (such as protection of crops, protection of materials, or avoidance of nuisance conditions).

The criteria pollutants consist of the following: ozone (O3), nitrogen oxides (NOx), carbon monoxide (CO), sulfur oxides (SOx), lead (Pb), and particulate matter (PM). The ozone precursors consist of NOx and VOC.

These pollutants can harm your health and the environment, and cause property damage. The United States Environmental Protection Agency (USEPA) calls these pollutants “criteria” air pollutants because it regulates them by developing human health-based and/or environmentally based criteria for setting permissible levels. Descriptions of each criteria pollutant can be found in Section 2.1 of the Air Quality Technical Report (Appendix A).

As part of its enforcement responsibilities, the USEPA requires each state with federal nonattainment areas to prepare and submit a State Implementation Plan (SIP) that demonstrates the means to attain the national standards. The SIP must integrate federal, state, and local components and regulations to identify specific measures to reduce pollution, using a combination of performance standards and marketbased programs within the timeframe identified in the SIP. The CARB defines attainment as the category given to an area with no violations in the past three years.

As indicated below in Table 3.3-1, the Mojave Desert Air Basin (MDAB) has been designated by the USEPA for the national standards as a non-attainment area for ozone and PM10. Currently, the MDAB is in attainment with the national ambient air quality standards for PM2.5, CO, SO2, and NO2.

Table 3.3-1. Mojave Desert Air Basin Attainment Status
Pollutant Federal Designation State Designation
Ozone (O3) Non-attainment* Non-attainment
Respirable Particulate Matter (PM10) Non-attainment** Non-attainment 513
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
21 Fine Particulate Matter (PM2.5) Unclassified/Attainment Non-attainment* Carbon Monoxide (CO) Unclassified/Attainment Attainment Nitrogen Dioxide (NO2) Unclassified/Attainment Attainment Sulfur Dioxide (SO2) Unclassified/Attainment Attainment * Southwest corner of desert portion of San Bernardino County only; ** San Bernardino County portion only
Source: https://www.mdaqmd.ca.gov/home/showpublisheddocument/1267/636337468837000000 Baseline Local Air Quality
The air quality at any site is dependent on the regional air quality and local pollutant sources. Regional air quality is determined by the release of pollutants throughout the MDAB as well as from air pollutants that travel from the coastal areas to the MDAB. The MDAQMD operates an extensive monitoring network throughout the County that continuously monitor ambient levels of criteria pollutants in compliance with federal monitoring regulations. The nearest air monitoring station to the project site is the Victorville Monitoring Station (Victorville Station), which is located approximately 4.8 miles southeast of the Project site at 14306 Park Avenue, Victorville. Baseline air quality data was utilized from this station and can be found in Appendix A.

Thresholds of Significance
The MDAQMD’s CEQA and Federal Conformity Guidelines (MDAQMD 2020), outlines significance determination thresholds. The MDAQMD Guidelines state that any project is significant if it triggers or exceed the most appropriate evaluation criteria, and further specifies that the emissions comparison (criteria number 1) is sufficient for most projects:

1. Generate total emissions (direct and indirect) in excess of the threshold given in Table 3.3-2;

2. Generates a violation of any ambient air quality standard when added to the local background;

3. Does not conform with the applicable attainment or maintenance plan(s) ;

4. Exposes sensitive receptors to substantial pollutant concentrations, including those resulting in a cancer risk greater than or equal to 10 in a million and/or a Hazard Index (HI) (non-cancerous) greater than or equal to 1.

The MDAQMD significant emissions thresholds are shown below in Table 3.3-2. According to the MDAQMD Guidelines, a significant project must incorporate mitigation sufficient to reduce its impact to a level that is not significant. A project that cannot be mitigated to a level that is not significant must incorporate all feasible mitigation. Note that the emission thresholds are given as a daily value and an annual value, so that multi-phased project (such as project with a construction phase and a separate operational phase) with phases shorter than one year can be compared to the daily value. Since construction of the proposed project is anticipated to take over a year, the annual threshold has been utilized for both short-term construction impact analysis and long-term operational impacts.

Table 3.3-2. MDAQMD Significant Emissions Thresholds
Pollutant Annual Threshold
(tons)
Daily Threshold
(pounds)
Carbon Monoxide (CO) 100 548
Oxides of Nitrogen (NOX) 25 137
Volatile Organic Compounds (VOC) 25 137
514
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
22 Pollutant Annual Threshold
(tons)
Daily Threshold
(pounds)
Oxides of Sulfur (SOX) 25 137
Particulate Matter (PM10) 15 82
Particulate Matter (PM2.5) 12 65
Lead (Pb) 0.6 3
Source: https://www.mdaqmd.ca.gov/home/showpublisheddocument?id=8510

3.3.2 Impact Analysis
a) Would the project conflict with or obstruct implementation of the applicable air quality plan? Less than Significant Impact. The proposed Project would not conflict with or obstruct implementation of the MDAQMD Air Quality Management Plans (AQMPs). The following is the analysis procedure detailed in the MDAQMD Guidelines for Conformity Impacts:

A project is non-conforming if it conflicts with or delays implementation of any applicable attainment or maintenance plan. A project is conforming if it complies with all applicable District rules and regulations, complies with all proposed control measures that are not yet adopted from the applicable plan(s), and is consistent with the growth forecasts in the applicable plan(s) (or is directly included in the applicable plan). Conformity with growth forecasts can be established by demonstrating that the project is consistent with the land use plan that was used to generate the growth forecast. An example of a non-conforming project would be one that increases the gross number of dwelling units, increases the number of trips, and/or increases the overall vehicle miles traveled in an affected area (relative to the applicable land use plan).

For this Project, the City’s General Plan Land Use Element defines the long range land use assumptions that are represented in the AQMPs. The Project site is currently designated as LM in the General Plan and is zoned LM. The Project would be consistent with the existing zoning and land uses of the City.

The proposed warehouse would be adjacent to existing industrial uses to the north and south and would provide employment opportunities in an area that currently has more housing than jobs, which would likely result in a reduction of vehicle miles traveled for the future employees that now have to commute long distances for work. Based on the above, the proposed Project would not result in an inconsistency with the AQMPs. Therefore, a less-than-significant impact would occur in relation to implementation of the AQMP.
b) Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? Less than Significant Impact. The proposed Project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard. The following section calculates the potential air emissions associated with the construction and operations of the proposed project and compares the emissions to the MDAQMD criteria pollutant emissions standards detailed above.

Construction Emissions
515
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
23 Construction activities for the proposed Project are anticipated to start early 2023 and would take approximately 13 months to complete. Construction activities for the proposed project are anticipated to include site preparation and grading of the 3.17-acre Project site, building construction of the warehouse facility, paving of the onsite driveways, truck loading area, and parking lots, and application of architectural coatings. The CalEEMod model has been used to calculate the construction-related criteria pollutant emissions from the proposed Project and the input parameters used in this analysis have been detailed in Section 7.1 of Appendix A. The annual construction-related criteria pollutant emissions from the proposed Project are shown below in Table 3.3-3 and the CalEEMod Annual printouts are provided in Appendix A.

Table3.3-3. Construction-Related Air Pollutant Emissions Pollutant Emissions1 (tons per year)
Construction Year VOC NOx CO SO2 PM10 PM2.5
2023 0.21 1.86 2.08 <0.01 0.16 0.11
2024 0.60 0.09 0.13 <0.01 <0.01 <0.01
MDAMD Thresholds 25 25 100 25 15 12
Exceeds Thresholds? No No No No No No
Notes:
1 Construction based on adherence to fugitive dust suppression requirements from MDAQMD Rule 403.2.

Source: CalEEMod Version 2020.4.0.

Table 3.3-3 shows that none of the analyzed criteria pollutants emissions would exceed the MDAQMD annual thresholds during construction of the proposed project. Therefore, a less-than-significant air quality emissions impact would occur from construction of the proposed Project.

Operational Emissions
The operations-related criteria air quality impacts created by the proposed Project have been analyzed through use of the CalEEMod model. The annual operations-related criteria pollutant emissions from the proposed Project are shown below in Table 3.3-4 and the CalEEMod annual printouts are provided in Appendix A.

Table 3.3-4. Operations-Related Air Pollutant Emissions Pollutant Emissions (tons per year)
Emissions Source VOC NOx CO SO2 PM10 PM2.5
Area Sources1 0.25 <0.01 <0.01 0.00 0.00 0.00
Energy Sources2 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01
Mobile Sources3 0.06 0.61 0.63 <0.01 0.21 0.06
Off-Road Equipment4 <0.01 0.08 1.20 <0.01 <0.01 <0.01
Total Emissions 0.32 0.70 1.83 <0.01 0.21 0.06
MDAMD Thresholds 25 25 100 25 15 12
Exceeds Thresholds? No No No No No No
Notes:
1 Area sources consist of emissions from consumer products, hearths, architectural coatings, and landscaping equipment. 2 Energy usage consist of emissions from natural gas usage. 3 Mobile sources consist of emissions from vehicles and road dust. 4 Off-road equipment consists of emissions from forklifts utilized onsite (Project Design Feature 1 restricts the operation of dieselpowered forklifts, so forklifts have been analyzed as CNG-powered. 516
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
24 Pollutant Emissions (tons per year)
Emissions Source VOC NOx CO SO2 PM10 PM2.5
Source: CalEEMod Version 2020.4.0.

Table 3.3-4 shows that none of the analyzed criteria pollutants emissions would exceed the MDAQMD annual emissions thresholds during operation of the proposed Project. Therefore, a less-thansignificant air quality emissions impact would occur from operation of the proposed Project. c) Would the project expose sensitive receptors to substantial pollutant concentrations? Less than Significant Impact. The proposed Project would not expose sensitive receptors to substantial pollutant concentrations. The MDAQMD Guidelines details that sensitive receptor land uses consist of: residences, schools, daycare centers, playgrounds and medical facilities are considered sensitive receptor land uses. The nearest sensitive receptors to the proposed Project are tract homes located as near as 2,300 feet (0.44 mile) to the south of the Project site.

According to the MDAQMD Guidelines, the following project types proposed for sites within the specified distance to an existing or planned (zoned) sensitive receptor land use must be evaluated to determine if it exposes sensitive receptors to substantial pollutant concentrations:
• Any industrial project within 1000 feet;
• A distribution center (40 or more trucks per day) within 1000 feet; • A major transportation project (50,000 or more vehicles per day) within 1000 feet; • A dry cleaner using perchloroethylene within 500 feet; • A gasoline dispensing facility within 300 feet.

The proposed Project would consist of development of a warehouse distribution facility. As mentioned in the Project Description (see Section 1.8), operation of the proposed Project is anticipated to generate 15 truck trips per working day. Because the nearest sensitive receptors are greater than 1,000 feet away (2,300 feet / 0.44 mile away), and because the proposed Project would generate fewer than 40 trucks per day (15 trucks per day), the proposed Project would not exceed thresholds detailed above for new industrial uses. Therefore, the proposed Project would result in a less-than-significant exposure of sensitive receptors to substantial pollutant concentrations. d) Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less than Significant Impact. The proposed Project would not create objectionable odors affecting a substantial number of people. Individual responses to odors are highly variable and can result in a variety of effects. Generally, the impact of an odor results from a variety of factors, such as frequency, duration, offensiveness, location, and sensory perception. The frequency is a measure of how often an individual is exposed to an odor in the ambient environment. The intensity refers to an individual’s or group’s perception of the odor strength or concentration. The duration of an odor refers to the elapsed time over which an odor is experienced. The offensiveness of the odor is the subjective rating of the pleasantness or unpleasantness of an odor. The location accounts for the type of area in which a potentially affected person lives, works, or visits; the type of activity in which he or she is engaged; and the sensitivity of the impacted receptor.
517
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
25 Sensory perception has four major components: detectability, intensity, character, and hedonic tone.

The detection (or threshold) of an odor is based on a panel of responses to the odor. There are two types of thresholds: the odor detection threshold and the recognition threshold. The detection threshold is the lowest concentration of an odor that will elicit a response in a percentage of the people that live and work in the immediate vicinity of the Project site and is typically presented as the mean (or 50 percent of the population). The recognition threshold is the minimum concentration that is recognized as having a characteristic odor quality, this is typically represented by recognition by 50 percent of the population. The intensity refers to the perceived strength of the odor. The odor character is what the substance smells like. The hedonic tone is a judgment of the pleasantness or unpleasantness of the odor. The hedonic tone varies in subjective experience, frequency, odor character, odor intensity, and duration. Potential odor impacts have been analyzed separately for construction and operations below.

Construction-Related Odor Impacts
Potential sources that may emit odors during construction activities include the application of coatings such as asphalt pavement, paints, and solvents, and from emissions from diesel equipment.

Standard construction requirements that limit the time of day when construction may occur as well as MDAQMD Rule 442 that limits VOC content in solvents, Rule 1103 that limits VOC content in asphalt and Rule 1113 that limits the VOC content in paints and solvents would minimize odor impacts from construction. As such, the objectionable odors that may be produced during the construction process would be temporary and would not likely be noticeable for extended periods of time beyond the Project site’s boundaries. Through compliance with the applicable regulations that reduce odors and due to the transitory nature of construction odors, a less-than-significant odor impact would occur, and no mitigation would be required.

Operations-Related Odor Impacts
The proposed Project would consist of the development of a warehouse. Operation of the proposed Project may create odors from diesel truck emissions, and from trash storage bins. Pursuant to City regulations, permanent trash enclosures that protect trash bins from rain as well as limit air circulation would be required for the trash storage areas. Diesel truck emissions odors would be generated intermittently from truck loading and unloading activities at the project site and would not likely be noticeable for extended periods of time beyond the project site boundaries. Due to the distance of the nearest receptors from the Project site (2,300 feet away) and through compliance with MDAQMD’s Rule 402 and City trash storage regulations, no significant impact related to odors would occur during the on-going operations of the proposed Project. Therefore, a less-than-significant odor impact would occur, and no mitigation would be required. 518
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
26 3.4 BIOLOGICAL RESOURCES

4. BIOLOGICAL RESOURCES.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Have a substantial adverse effect, either directly or through habitat modifications, on any species
identified as a candidate, sensitive, or special status species in local or regional plans, policies, or
regulations, or by the California Department of Fish
and Game or U.S. Fish and Wildlife Service?
(b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community
identified in local or regional plans, policies,
regulations or by the California Department of Fish
and Wildlife or U.S. Fish and Wildlife Service?
(c) Have a substantial adverse effect on state or
federally protected wetlands (including, but not
limited to, marsh, vernal pool, coastal, etc.) through
direct removal, filling, hydrological interruption, or
other means?
(d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife
nursery sites?
(e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
(f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state
habitat conservation plan?

3.4.1 Environmental Setting
Chambers Group biologists conducted a Biological Resource Reconnaissance Assessment, comprising a literature review and biological reconnaissance-level survey, in April 2022. The purpose of the survey was to document existing vegetation communities, identify special status species with a potential for occurrence, map habitats that could support special status wildlife species, and evaluate potential impacts of the Project to these resources. The Biological Resources Reconnaissance Assessment Report is provided in Appendix B.

Prior to performing the biological reconnaissance-level survey, Chambers Group biologists conducted a literature review of the latest available literature, publications, mapping and GIS data, and relevant databases for soils, jurisdictional water features that contribute to hydrology, and special status species known to occur within approximately 5 miles of the proposed Project site (Survey Area).

The biological reconnaissance-level survey was conducted on foot within the Project site on April 26, 2022, between the hours of 10:00 a.m. and 12:00 p.m. by Chambers Group biologists Heather Franklin and Alisa Muniz. During the pedestrian survey, the biologists identified and mapped all vegetation communities 519
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
27 observed within the Survey Area. Plant communities were determined in accordance with the Manual of California Vegetation, Second Edition (Sawyer et al. 2009). Plant nomenclature follows that of The Jepson Manual, Vascular Plants of California, Second Edition (Baldwin et al. 2012). Plant and wildlife species observed or detected within the Survey Area were recorded (Appendix B: Attachments 2 and 3), and site photographs were taken to document current site conditions (Appendix B: Attachment 4).

Biological Site Conditions
Literature Review
According to the results from the USDA NRCS Web Soil Survey (USDA 2022), the Project Site is located in the Mojave River Area, CA671 part of the soil map. One soil type is known to occur within and/or adjacent to the Project site: Cajon sand (0 to 2 percent slopes). The Project site is located within the Manzanita Wash Watershed (HUC 180902080503) and does not contain or abut any jurisdictional features (e.g., drainages or swales).

Database searches (CDFW 2022a; CNPS 2022) identified eight federally or state-listed threatened, endangered, or otherwise special-status plant species documented to historically occur within the vicinity of the Survey Area (Appendix B: Figure 3 – CNDDB Occurrences Map). It was determined that all eight plant species identified by the database searches are considered absent from the Survey Area due to lack of suitable habitat.

Database searches (CDFW 2022a; USFWS 2022) identified 26 federally or state-listed endangered or threatened, State Species of Concern, or otherwise special-status wildlife species documented to occur within the Survey Area (Appendix B: Figure 3 – CNDDB Occurrences Map). It was determined that all 26 special-status wildlife species identified during the literature review are absent due to the lack of suitable habitat present within the Project site. According to the USFWS Critical Habitat WebGIS map, the Project site does not contain or abut any designated Critical Habitat (USFWS 2022). Critical Habitat for the southwestern willow flycatcher occurs approximately 4 miles east of the Project site; however, no connectivity occurs between the Project site and the designated critical habitat.

Biological Reconnaissance-Level Survey
Four vegetation communities or land types were observed within the Survey Area during the biological reconnaissance-level survey: disturbed, ornamental, ruderal, and developed landscape. Most of the Project site is disturbed with some portions of ruderal vegetation occurring along the southern edge of the site, and a small, developed area including a small portable building with ornamental vegetation occurs in the northeast section of the site. Twelve plant species were observed within the Survey Area during the survey and are representative of the existing Study Area conditions; special-status special plant species were not observed. Seven wildlife species were observed within the Survey Area and were characteristic of the existing Survey Area condition; special-status special wildlife species were not observed.

3.4.2 Impact Analysis
a) Would the project have a substantial adverse effect, either directly or through habitat modification, on any species identified as candidate, sensitive or special status species in local or regional plans, 520
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
28 policies or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
Less than Significant Impact. Existing on the site is a vacant manufactured commercial building, iron fence, and two concrete slabs, including a designated parking area. Beginning at the eastern entrance gate, and surrounding the parking slab, is a slightly dispersed layering of 1-4-inch sized rip rap gravel.

There are also multiple imported pine trees separating the building and parking slab, with two Conex boxes located to the west. The site contains minimal vegetation. A search of the CNDDB and USFWS databases identified eight special status plant species and 26 animal species with 5 miles of the Project site; however, no special status species were observed during the biological reconnaissance-level survey and all special status species are considered absent from the Project site due to lack of suitable habitat within the Survey Area. Additionally, the Project site has four vegetation communities present within the Survey Area: Disturbed, Ornamental, Ruderal, and Developed. These communities do not support any special status species or critical habitat, and do not support any local vegetation communities. Therefore, all potential special status plant and animal species are considered absent from the survey area. However, the Project would be required to comply with the MBTA which notes that prior to any ground disturbance, to the greatest extent feasible, construction activities should take place outside nesting season (February 1 to August 31). If construction activities occur during nesting season, preconstruction nesting bird surveys should be conducted. Compliance with the MBTA, and lack of special status species being present at the Project site, impacts would be less than significant.
b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? No Impact. As discussed in Section 3.4.1, the proposed Project site does not contain any jurisdictional features, including drainages and swales, or other hydrological features that could support or have the potential to contain riparian habitat (CDFW 2022a; USFWS 2022). The proposed Project is located in a flat rural area with native desert vegetation within and surrounding the site. Furthermore, Chambers Group biologists did not observe riparian habitat or other sensitive natural communities within the proposed Project site during the biological survey. Implementation of the proposed Project does not have the potential to have an adverse effect on any riparian habitat or sensitive natural community identified in local or regional plans, policies, regulations, or by the CDFW or USFWS.

Therefore, no impacts would occur.
c) Would the project have a substantial adverse effect on state or federally protected wetlands (including but not limited to marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
No Impact. As discussed above in Sections 3.4.1 and 3.4.2 (b), no jurisdictional features or state or federally protected wetlands occur within or adjacent to the proposed Project site. Therefore, no impacts would occur.
d) Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
521
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
29 Less than Significant Impact. Based on the results of the biological reconnaissance-level survey, the proposed Project would not substantially interfere with the movement of any native resident or migratory species or with established native or migratory wildlife corridors, or impede the use of native nursery sites the Project would be required to comply with the MBTA which notes that prior to any ground disturbance, to the greatest extent feasible, construction activities should take place outside nesting season (February 1 to August 31). If construction activities occur during nesting season, preconstruction nesting bird surveys should be conducted. Impacts therefore are less than significant.
e) Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
No Impact. As discussed in Section 3.4.2 (a), no special status species occur within the Project site.

The only tree species found on site were ornamental, consisting of cultivated pine trees, which are not protected under any local policies or ordinances. Therefore, no impacts would occur. f) Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Conservancy Conservation Plan, or other approved local, regional, or state habitat conservation plan? No Impact. The proposed Project is not located in an area within a Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan (CDFW 2022b). Implementation of the Project would, therefore, not result in impacts to any such plans.

3.5 CULTURAL RESOURCES

5. CULTURAL RESOURCES.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Cause a substantial adverse change in the
significance of a historical resource pursuant to
§15064.5?
(b) Cause a substantial adverse change in the
significance of an archaeological resource pursuant
to §15064.5?
(c) Disturb any human remains, including those interred outside of formal cemeteries?

3.5.1 Environmental Setting
Chambers Group archaeologists prepared a Cultural Resource Survey and Report for the Project in August 2022 (Appendix C). The assessment included a cultural resources records search, literature review and research, and field survey of the Project site.

Chambers Group requested a records search from the California Historical Resources Information System (CHRIS) South Central Coastal Information Center (SCCIC) at California State University, Riverside on April 1, 2022. The SCCIC returned the records search results on March 3, 2022, providing information on all documented cultural resources and previous archaeological investigations within 0.5 mile of the Project 522
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
30 site. Resources consulted during a records search conducted by the SCCIC include the NRHP, California Historical Landmarks (CHL), California Points of Historical Interest (CPHI), Caltrans Historic Highway Bridge Inventory, the California State Historic Resources Inventory, local registries of historic properties, and a review of available Sanborn Fire Insurance maps as well as historical photographs, maps, and aerial imagery. Based on the records search conducted by the SCCIC, eight previously recorded cultural resources are recorded within 0.5 mile of the Project site; however, none of these resources are within the Project site boundaries. A list of the previously recorded cultural resources within 0.5 mile of the Project site is provided in Appendix C.

In addition to the SCCIC record search, Chambers Group archaeologists completed research (literature review) to determine if any additional historic properties, landmarks, bridges, or other potentially significant or listed properties are located within the Project footprint or 0.5-mile study area. As a result of the literature review, no previously recorded resources or any other listed or potentially significant properties were identified within the Project site.

Chambers Group archaeologist and cross-trained paleontologist Kellie Kandybowicz conducted a cultural resources Phase I intensive pedestrian survey of the Project site on April 14, 2022. The cultural resources survey consisted of systematic surface inspection of all areas with transects walked at 10-meter intervals to ensure that any evidence of surface-exposed cultural materials and/or evidence of paleontological resources could be identified. Chambers Group examined the ground surface for the presence of prehistoric artifacts (e.g., flaked stone tools, tool-making debris, stone milling tools), historical artifacts (e.g., metal, glass, ceramics), sediment discoloration that might indicate the presence of a cultural midden, roads and trails, and depressions and other features that might indicate the former presence of structures or buildings (e.g., post holes, foundations). No surface evidence of prehistoric or historic archaeological resources or paleontological resources was identified within the Project site.

Additionally, Chambers Group submitted a request to the Native American Heritage Commission (NAHC) on April 1, 2022, to provide a review of the Sacred Land Files (SLF) for the Project site and surrounding vicinity. On May 13, 2022, Chambers Group received a response from the NAHC stating that the search of its Sacred Lands File was negative for the presence of Native American cultural resources within Project site and the record search study area.

3.5.2 Impact Analysis
a) Would the project cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5?
b) Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
Less than Significant Impact. Results from the survey and records search indicated that no previously recorded historic cultural resources have been documented within the proposed Project site. During the pedestrian survey, no previously undiscovered resources were discovered. Various cans and glass bottles were observed, however, none are considered historically significant. The Project site has not been found to contain recorded evidence of historic cultural resources. Additionally, the Project would be required to comply with the City of Adelanto Policy Implementation Program for the potential of undiscovered archaeological resources.
523
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
31 Program OS-13:Disturbances of Archaeological Resources If the archaeological assessment did not identify potentially significant archaeological resources in the proposed planning area but indicates the area to be of medium or high sensitivity for archaeological resources, an archaeologist who meets the PQS shall be retained on an on-call basis.

The archaeologist shall inform all construction personnel prior to construction activities about the proper procedures in the event of an archaeological discovery.

The training shall be held in conjunction with the project’s initial on-site safety meeting and shall explain the importance and legal basis for the protection of significant archaeological resources. In the event that archaeological resources (artifacts or features) area exposed during ground disturbing activities, construction activities within a 50-foot radius of the discovery shall be halted while the on-call archaeologist is contacted. If the resource is determined to be significant or unique through significance evaluation, and site avoidance is not possible, appropriate sitespecific mitigation measures shall be established and undertaken. These might include an archaeological data recovery program that would be implemented by a qualified archaeologist and performed in accordance with the Office of Historic Preservation’s Archaeological Resource Management Reports (ARMR). If the discovery proves to be significant, it shall be curated with a qualified scientific of educational repository, as defined by the Guidelines for the Curation of Archaeological Collections.

Compliance with the City’s polocies and local regulations, in addition to the negative results of any resources on the Project site, impacts would be less than significant. c) Would the project disturb any human remains, including those interred outside of formal cemeteries? Less than Significant Impact. As noted in the discussion above, no available information suggests that human remains may occur within the Project site and the potential for such an occurrence is considered very low. However, if during construction human remains are found on site, the Project is required to comply with the State of California Health and Safety Code Section 7050.5, CEQA Section 15064.5, and California Public Resources Code Section 5097.98. This code section states that no further disturbance shall occur until the San Bernardino County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98. In the event of an unanticipated discovery of human remains, the County Coroner shall be notified immediately. If the human remains are determined to be prehistoric, the County Coroner shall notify the NAHC, which shall notify a most likely descendant (MLD). The MLD shall complete the inspection of the site within 48 hours of notification and may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials. . Compliance with the State regulations would ensure that impacts would remain less than significant. 524
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
32 3.6 ENERGY

6. ENERGY
Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Result in potentially significant environmental
impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
(b) Conflict with or obstruct a state or local plan
for renewable energy or energy efficiency?

3.6.1 Environmental Setting
An Air Quality, Energy, and Greenhouse Gas Analysis was prepared for the proposed Project and is included in Appendix A. The results of the analysis are summarized below. This analysis includes a discussion of the potential energy impacts of the proposed Project, with particular emphasis on avoiding or reducing inefficient, wasteful, and unnecessary consumption of energy. A general definition of the energy resources that the Project may use, are provided below.

Electricity, a consumptive utility, is a man-made resource. The production of electricity requires the consumption or conversion of energy resources, including water, wind, oil, gas, coal, solar, geothermal, and nuclear resources, into energy. The delivery of electricity involves a number of system components, including substations and transformers that lower transmission line power (voltage) to a level appropriate for on-site distribution and use. The electricity generated is distributed through a network of transmission and distribution lines commonly called a power grid. Conveyance of electricity through transmission lines is typically responsive to market demands. In 2020, San Bernardino County consumed 15,969 Gigawatt-hours per year of electricity.

Natural gas is a combustible mixture of simple hydrocarbon compounds (primarily methane) that is used as a fuel source. Natural gas consumed in California is obtained from naturally occurring reservoirs, mainly located outside the State, and delivered through high-pressure transmission pipelines. The natural gas transportation system is a nationwide network and, therefore, resource availability is typically not an issue. Natural gas satisfies almost one-third of the State’s total energy requirements and is used in electricity generation, space heating, cooking, water heating, industrial processes, and as a transportation fuel. Natural gas is measured in terms of cubic feet. In 2020, San Bernardino County consumed 527.24 Million Therms of natural gas.

Petroleum-based fuels currently account for a majority of the California’s transportation energy sources and primarily consist of diesel and gasoline types of fuels. However, the state has been working on developing strategies to reduce petroleum use. Over the last decade California has implemented several policies, rules, and regulations to improve vehicle efficiency, increase the development and use of alternative fuels, reduce air pollutants and GHG emissions from the transportation sector, and reduce VMT. Accordingly, petroleum-based fuel consumption in California has declined. In 2017, 1,377 million gallons of gasoline and 265 million gallons of diesel was sold in San Bernardino County.
525
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
33 The following section calculates the potential energy consumption associated with the construction and operations of the proposed project and provides a determination if any energy utilized by the proposed project is wasteful, inefficient, or unnecessary consumption of energy resources.

3.6.2 Impact Analysis
a) Would the project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Less than Significant Impact. The proposed Project would impact energy resources during construction and operation. Energy resources that would be potentially impacted include electricity, natural gas, and petroleum-based fuel supplies and distribution systems.

Construction Energy
The construction activities for the proposed Project are anticipated to include site preparation and grading of the 3.17-acre Project site, building construction of the warehouse facility, paving of the onsite driveways, truck loading area, and parking lots, and application of architectural coatings. The proposed Project would consume energy resources during construction in three general forms:
• Petroleum-based fuels used to power off-road construction vehicles and equipment on the Project site, construction worker travel to and from the project site, as well as delivery and haul truck trips (e.g. hauling of material to disposal facilities); • Electricity associated with the conveyance of water that would be used during project construction for dust control (supply and conveyance) and electricity to power any necessary lighting during construction, electronic equipment, or other construction activities necessitating electrical power; and,
• Energy used in the production of construction materials, such as asphalt, steel, concrete, pipes, and manufactured or processed materials such as lumber and glass.

Construction-Related Electricity
During construction the proposed Project would consume electricity to construct the proposed warehouse and infrastructure. Electricity would be supplied to the Project site by Southern California Edison and would be obtained from the existing electrical lines on the Project site. The use of electricity from existing power lines rather than temporary diesel or gasoline powered generators would minimize impacts on fuel consumption. Electricity consumed during project construction would vary throughout the construction period based on the construction activities being performed.

Various construction activities include electricity associated with the conveyance of water that would be used during project construction for dust control (supply and conveyance) and electricity to power any necessary lighting during construction, electronic equipment, or other construction activities necessitating electrical power. Such electricity demand would be temporary, nominal, and would cease upon the completion of construction. Overall, construction activities associated with the proposed Project would require limited electricity consumption that would not be expected to have an adverse impact on available electricity supplies and infrastructure. Therefore, the use of electricity during project construction would not be wasteful, inefficient, or unnecessary. 526
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
34 Since there is currently power provided to the Project site, it is anticipated that only nominal improvements would be required to Southern California Edison distribution lines and equipment with development of the proposed Project. Compliance with City’s guidelines and requirements would ensure that the proposed Project fulfills its responsibilities relative to infrastructure installation, coordinates any electrical infrastructure removals or relocations, and limits any impacts associated with construction of the Project. Construction of the Project’s electrical infrastructure is not anticipated to adversely affect the electrical infrastructure serving the surrounding uses or utility system capacity.

Construction-Related Natural Gas
Construction of the proposed Project typically would not involve the consumption of natural gas.

Natural gas would not be supplied to support construction activities, thus there would be no demand generated by construction. Since there is currently natural gas service to of the Project site, construction of the proposed Project would be limited to installation of new natural gas connections within the Project site. Development of the proposed Project would likely not require extensive infrastructure improvements to serve the Project site. Construction-related energy usage impacts associated with the installation of natural gas connections are expected to be confined to trenching in order to place the lines below surface. In addition, prior to ground disturbance, the proposed Project would notify and coordinate with SoCalGas to identify the locations and depth of all existing gas lines and avoid disruption of gas service. Therefore, construction-related impacts to natural gas supply and infrastructure would be less than significant.

Construction-Related Petroleum Fuel Use
Petroleum-based fuel usage represents the highest amount of transportation energy potentially consumed during construction, which would be utilized by both off-road equipment operating on the project site and on-road automobiles transporting workers to and from the Project site and on-road trucks transporting equipment and supplies to the Project site.

The off-road construction equipment fuel usage was calculated through use of the off-road equipment assumptions and fuel use assumptions shown in Section 8.2 of Appendix A, which found that construction of the proposed project would consume 2,808 gallons of gasoline and 36,590 gallons of diesel fuel. This equates to 0.0002 percent of the gasoline and 0.01 percent of the diesel used annually in San Bernardino County. As such, the construction-related petroleum use would be nominal, when compared to current county-wide petroleum usage rates.

Construction activities associated with the proposed project would be required to adhere to all State and MDAQMD regulations for off-road equipment and on-road trucks, which provide minimum fuel efficiency standards. As such, construction activities for the proposed Project would not result in the wasteful, inefficient, and unnecessary consumption of energy resources. Impacts regarding transportation energy would be less than significant. Development of the Project would not result in the need to manufacture construction materials or create new building material facilities specifically to supply the proposed Project. It is difficult to measure the energy used in the production of construction materials such as asphalt, steel, and concrete, it is reasonable to assume that the production of building materials such as concrete, steel, etc., would employ all reasonable energy conservation practices in the interest of minimizing the cost of doing business. 527
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
35 Operational Energy
The proposed Project would consist of development of a warehouse distribution facility. The on-going operation of the proposed Project would require the use of energy resources for multiple purposes including, but not limited to, heating/ventilating/air conditioning (HVAC), refrigeration, lighting, appliances, and electronics. Energy would also be consumed during operations related to water usage, solid waste disposal, landscape equipment and vehicle trips.

Operations-Related Electricity
Operation of the proposed Project would result in consumption of electricity at the Project site. As detailed in Section 8.3 of Appendix A, the proposed Project would consume 121,831 kilowatt-hours per year of electricity. This equates to 0.0008 percent of the electricity consumed annually in San Bernardino County. As such, the operations-related electricity use would be nominal, when compared to current electricity usage rates in the County.

It should be noted that, the proposed Project would comply with all Federal, State, and City requirements related to the consumption of electricity, that includes CCR Title 24, Part 6 Building Energy Efficiency Standards and CCR Title 24, Part 11: California Green Building Standards. The CCR Title 24, Part 6 and Part 11 standards require numerous energy efficiency measures to be incorporated into the proposed warehouse, including enhanced insulation, use of energy efficient lighting and appliances as well as requiring a variety of other energy-efficiency measures to be incorporated into the proposed structures. Therefore, it is anticipated the proposed project will be designed and built to minimize electricity use and that existing and planned electricity capacity and electricity supplies would be sufficient to support the proposed project’s electricity demand. Thus, the Project would not result in the wasteful or inefficient use of electricity and no mitigation measures would be required.

Operations-Related Natural Gas
Operation of the proposed Project would result in increased consumption of natural gas at the Project site. As detailed in Section 8.3 of Appendix A the proposed Project would consume 100 MBTU per year of natural gas. This equates to 0.00002 percent of the natural gas consumed annually in San Bernardino County. As such, the operations-related natural gas use would be nominal, when compared to current natural gas usage rates in the County.

It should be noted that, the proposed Project would comply with all Federal, State, and City requirements related to the consumption of natural gas, that includes CCR Title 24, Part 6 Building Energy Efficiency Standards and CCR Title 24, Part 11: California Green Building Standards. The CCR Title 24, Part 6 and Part 11 standards require numerous energy efficiency measures to be incorporated into the proposed warehouse, including enhanced insulation as well as use of efficient natural gas appliances and HVAC units. Therefore, it is anticipated the proposed Project will be designed and built to minimize natural gas use and that existing and planned natural gas capacity and natural gas supplies would be sufficient to support the proposed Project’s natural gas demand. Thus, impacts with regard to natural gas supply and infrastructure capacity would be less than significant and no mitigation measures would be required
Operations-Related Vehicular Petroleum Fuel Usage
528
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
36 Operation of the proposed Project would result in increased consumption of petroleum-based fuels related to vehicular travel to and from the Project site. As detailed in Section 8.2 of Appendix A the proposed Project would consume 10,779 gallons of gasoline and 27,620 gallons of diesel fuel per year from vehicle travel. This equates to 0.0008 percent of the gasoline and 0.01 percent of the diesel consumed annually in San Bernardino County. As such, the operations-related petroleum use would be nominal, when compared to current county-wide petroleum usage rates. Therefore, it is anticipated the proposed Project will be designed and built to minimize transportation energy and it is anticipated that existing and planned capacity and supplies of transportation fuels would be sufficient to support the proposed Project’s demand. Thus, impacts with regard transportation energy supply and infrastructure capacity would be less than significant and no mitigation measures would be required.

In conclusion, the proposed Project would comply with regulatory compliance measures outlined by the State and County related to Air Quality, GHG Emissions, Transportation/Circulation, and Water Supply. Additionally, the proposed Project would be constructed in accordance with all applicable City Building and Fire Codes. Therefore, the proposed Project would not result in the wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation.

Impacts would be less than significant.
b) Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Less than Significant Impact. The proposed Project would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency. The applicable energy plan for the proposed Project is the Adelanto North 2035 Comprehensive Sustainable Plan, which was adopted on August 27, 2014.

The proposed Project’s consistency with the applicable energy-related policies in the Comprehensive Sustainable Plan are shown below in Table 3.6-1.

Table 3.6-1. Proposed Project Compliance with Applicable General Plan Energy Policies Policy No. General Plan Policy Proposed Project Implementation Actions Goal LC 4: Sustainability incorporated into land use patterns and development approaches.

LC 4.3 Create a sustainable community that is
responsive to the environmental, water,
and energy conservation needs of the
region and local area.

Consistent. The proposed warehouse will be
designed to exceed the 2019 Title 24 Part 6 building
standards and CalGreen Building Code design
standards that require that new non-residential
buildings be designed to conserve energy and water
usage.

LC 4.4 Promote the use of solar, wind, and other
alternative energy generation systems as
part of new planned development.

Consistent. The proposed warehouse will be
designed to meet the 2019 Title 24 Part 6 building
standards that require that new non-residential
buildings be designed to be “solar ready” that
includes structurally designing the roof to support
solar PV panels and installation of electrical conduit
to support PV panels.

Goal LC 7: Passive solar design and green building practices take advantage of Adelanto’s solar and wind conditions.
529
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
37 Policy No. General Plan Policy Proposed Project Implementation Actions LC 7.1 Encourage the design and construction of
buildings to go beyond the requirements
of the CALGreen Building Code.

Consistent. The proposed warehouse will be
designed to exceed the CalGreen design standards.

LC 7.2 Orient buildings to take advantage of
solar gain, thus allowing the absorption of
the sun’s heat during colder months,
while minimizing the sun’s heat during
warmer months.

Consistent. The proposed warehouse will be
oriented with the majority of windows on the east
side in order to heat transfer through the windows.

LC 7.3 Encourage long overhangs to screen
summer sun and allow for solar gain in
the winter.

Consistent. The proposed warehouse will include
larger overhangs than typical warehouses.

LC 7.4 Orient buildings on an east-west axis to
minimize western exposure.

Consistent. The proposed warehouse will be
oriented in an east-west direction, with the
windows concentrated on the east side to minimize
sun exposure and associated heat transfer on the
windows.

LC 7.5 Take full advantage of the wind to cool
buildings in the summer months, and
where feasible, generate alternative
energy.

Consistent. The proposed warehouse will be
designed to allow for the truck loading docks to
remain open, when weather permits to allow the
wind to cool the building.

LC 7.7 Locate windows to maximize daylighting
and views. Awnings, landscaping,
spectrally selective glass, and controllable
blinds should be provided to reduce heat
gain through windows.

Consistent. The windows have been located
primarily on the east side in order to maximize
daylighting, while minimizing the heat transfer
through the windows.

LC 7.9 Encourage the building envelope to:
• Minimize heat loss and gain
• Reduce energy demand
• Maximize passive heating and cooling
• Minimize mechanical HVAC
requirements
Consistent. The proposed warehouse will be
designed to exceed the 2019 Title 24 Part 6 building
standards and CalGreen Building Code design
standards that through application of these
standards will minimize heat loss and gain, reduce
energy demand, maximize passive heating and
cooling and minimize mechanical HVAC
requirements.

LC 7.10 Promote glazing, size, and materials
appropriate for window orientation, and
promote the use of double or triple
glazing wherever possible. Encourage
every exterior window to be shaded
appropriately for the window orientation.

Consistent. All windows installed on the proposed
warehouse will exceed the 2019 Title 24 Part 6
building standards that require the use of either
double glazing or extra thick glass that provides
enhanced insulation. In addition, the windows will
be primarily placed on the east side of the
structure, in order to minimize the amount of
sunlight and associated heat transfer on the
windows.

LC 7.11 Encourage the use of energy-efficient
heating, ventilation and air conditioning
(HVAC) Systems and electrical systems.

Consistent. The proposed warehouse will be
designed to meet the 2019 Title 24 energy
efficiency standards, that require installation of
energy efficient HVAC systems.

Goal OS 3: Energy conservation and renewable energy production is maximized to reduce natural resources and fossil fuels consumption.
530
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
38 Policy No. General Plan Policy Proposed Project Implementation Actions OS 3.1 Promote the use of renewable energy and
support efforts to develop small-scale,
distributed energy (e.g., solar power and
wind power) to reduce the amount of
electricity drawn from the regional power
grid, while providing Adelanto with a
greater degree of energy self-sufficiency.

Consistent. The proposed warehouse will be
designed to meet the 2019 Title 24 Part 6 building
standards that require that new non-residential
buildings be designed to be “solar ready” that
includes structurally designing the roof to support
solar PV panels and installation of electrical conduit
to support PV panels.

OS 3.2 Encourage new warehousing,
manufacturing, industrial, and large
commercial retail buildings to be designed
to accommodate future rooftop solar
panel systems.

Consistent. The proposed warehouse will be
designed to meet the 2019 Title 24 Part 6 building
standards that require that new non-residential
buildings be designed to be “solar ready” that
includes structurally designing the roof to support
solar PV panels and installation of electrical conduit
to support PV panels.

OS 3.5 Require all new development to provide
site design and building orientation that
take into account passive solar design to
reduce heating and cooling loads through
energy-efficiency strategies.

Consistent. The proposed warehouse will be
oriented in an east-west direction, with the
windows concentrated on the east side to minimize
sun exposure and associated heat transfer on the
windows.

OS 3.8 Conserve energy by promoting efficient
and cost-effective lighting that reduces
glare and light pollution.

Consistent. All lighting on the project site will be
required to meet the CalGreen Building Standards,
which require the installation of LED or other
energy efficient lighting and also requires the use of
lighting controls that automatically dim or turn off
lights when sensors determine that no people are in
the area.

Source: City of Adelanto, 2014.

As shown in Table 3.6-1, the proposed Project would be consistent with all applicable energy-related policies from the Comprehensive Sustainable Plan. Therefore, the proposed Project would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency. Impacts would be less than significant.

3.7 GEOLOGY AND SOILS

7. GEOLOGY AND SOILS.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the State
Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking?
531
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
39 7. GEOLOGY AND SOILS.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
iii) Seismic-related ground failure, including
liquefaction?
iv) Landslides?
(b) Result in substantial soil erosion or the loss of
topsoil?
(c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the
project, and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction
or collapse?
(d) Be located on expansive soil, as defined in Table 18- 1-B of the Uniform Building Code (1994), creating
substantial direct or indirect risks to life or property? (e) Have soils incapable of adequately supporting the
use of septic tanks or alternative waste water
disposal systems where sewers are not available for
the disposal of waste water?
(f) Directly or indirectly destroy a unique
paleontological resource or site or unique geological
feature?

3.7.1 Environmental Setting
Chambers Group prepared a Cultural Resource Survey and Report for the Project in August 2022 (Appendix C). The assessment included a paleontological resources review of the Project site.

The overall Adelanto area is a portion of the southern extent of the Mojave Desert and western extent of the Colorado Desert. As such, this area is characterized by the presence of decomposing granite derived from the nearby hillsides and windborne or water-borne alluvial deposits. Additional information from California Geological Survey indicates that the Project site is situated atop geological formations of Pleistocene to Holocene age sediments comprising largely non-marine alluvium, lake, playa, and terrace deposits; both unconsolidated and semi-consolidated (Jennings 2010).

Chambers Group requested a paleontological records search from the San Bernardino County Museum (SBCM) on April 1, 2022 and received the results on July 15, 2022. This information was requested with the intent to provide further context related to the paleontological sensitivity of the area based on known fossil locations identified within the Project site or 0.5-mile study area. The paleontological records provide insight into what associated geological formations are more likely to contain fossils as well as the associated depths and placement of the known fossil locals relative to the geological formations in the area.

3.7.2 Impact Analysis
a) i) Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on 532
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
40 other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication

42. ii) Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving strong seismic ground shaking? Less than Significant Impact. Several faults run through the region, and as with much of southern California, the proposed structures will be subject to strong seismic ground shaking impacts should any major earthquakes occur in the future. According to the California Department of Conservation the nearest Alquist-Priolo (AP) Fault Hazard Zone is the Helendale Fault zone located over 15 miles northeast of the Project site, followed by the San Andres Fault located over 18 miles southwest of the Project site (DOC 2022c). No fault zones are located directly within the City, however some additional non- AP designated faults are located nearby, the closest one being the Mirage Valley Fault located just over 10 miles northwest of the Project site (DOC 2022c). the Project site and area can be exposed to significant ground shaking during major earthquakes on either of these regional faults. As a result, and like all other development projects in the City and throughout the Southern California Region, the proposed Project will be required to comply with all applicable seismic design standards contained in the current California Building Code (CBC).

Compliance with the CBC will ensure that structural integrity will be maintained in the event of an earthquake. Therefore, impacts associated with AP Faults and strong ground shaking will be less than significant.
iii) Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure, including liquefaction? No Impact. Liquefaction is the process in which loose, saturated granular soil loses strength because of cyclic loading. The strength loss is a result of a decrease in granular sand volume and a positive increase in pore pressures. The Department of Conservation shows the nearest liquefaction zone located over 20 miles west of the Project site (DOC 2022c). Additionally, no large water sources are located near the Project site (Google 2022). Therefore, it is not anticipated that the proposed Project would experience seismic-related ground failure including liquefaction, and no impact would occur.
iv) Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving landslides?
No Impact. The elevation at the Project site is approximately 2,871 feet amsl and is not immediately adjacent to any slopes or hillsides that could be potentially susceptible to landslides.

As such, risks associated with slope instability should be considered “negligible.” Therefore, no impacts related to landslides would occur.
b) Would the project result in substantial soil erosion or the loss of topsoil? Less than Significant Impact. Erosion is a large-scale impact caused by human activity and disturbance of surface soil, wind, and water. Existing on the site is a vacant manufactured commercial building and two concrete slabs, including a designated parking area. There are also multiple imported pine trees separating the building and parking slab. Located to the west of the building are two Conex boxes.

The site contains minimal vegetation. During construction, demolition of the existing structures and 533
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
41 grading of the site would expose soil to wind and water erosion. The developer would be required to comply with the General Construction Activity Storm Water Permit issued by the State Water Resources Control Board (SWRCB) under the National Pollution Discharge Elimination System (NPDES). Construction activity subject to this permit includes clearing, grading and disturbances to the ground such as stockpiling, or excavation. To obtain coverage under this permit, the developer would need to submit a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP would identify potential pollution sources and best management practices (BMPs) to reduce pollutants. Compliance with the SWPPP would reduce impacts related to soil erosions to less than significant. c) Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
Less than Significant Impact. Potential instability associated with slope stability and liquefaction related to the project was determined to be negligible. As mentioned in Threshold d below, the soil on site is considered a sandy material. The risk for subsidence at the site is considered low because, as mentioned in Threshold d below, the soils on site are of sandy material, and do not contain clay, and as such are not particularly susceptible to subsidence. As such, the Project would not be located on an unstable geologic unit and impacts would be less than significant. d) Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less than Significant Impact. According to the United States Department of Agriculture (USDA) Web Soil Survey map prepared for the Project site, the site is located on Cajon Sand (USDA 2022). Expansive soils are generally of a clay type soil, not a sandy soil such as the Cajon Sands series soils that underlay the Project site. Compliance with the current CBC is sufficient to ensure that the proposed structures will conform to the underlying soils and thereby be constructed safely as habitable structures. Thus, based on the absence of clay-type soils on site, the proposed Project would have a less than significant potential to be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property. e) Would the project have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? No Impact. The Project would not include use septic tanks or other alternative wastewater treatment methods. Therefore, implementation of the Project would result in no impact associated with soils incapable of supporting septic systems or alternative wastewater treatment methods. f) Would the project directly or indirectly destroy a unique paleontological resource or site or unique geological feature?
Less than Significant Impact. The SBCM records search revealed that the Project site is located most immediately atop recent alluvial surficial deposits of Holocene age (Qa) comprised of unconsolidated mixed sand, silt, and gravel, often covered by soil and these upper deposits appear unlikely to be fossiliferous (Dibblee and Minch, 2008). However, these upper deposits directly overlie approximately

1.8 million- to 11,000-year-old Pleistocene alluvial deposits (Qoa) that are found to be highly fossiliferous in the local area. These Qoa deposits are understood to be present at depths as shallow 534
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
42 as 3 feet below native surface in Adelanto but are exposed to the surface at the Mojave River to the east of the Project site.

Qoa has been shown to contain several fossil localities near the Project site. The SBCM records search indicated that within the requested 0.5-mile study area, three fossil localities (SBCM 1.115.1, 1.115.2, and 1.115.3) were found located at depths of 5 to 14 feet under the surface in middle to late Pleistocene age older alluvium consisting of mixed green to buff colored fine sand, silt, and clay, underlying the surficial younger alluvium. Additionally, the SBCM noted that outside of the 0.5-mile search radius, several other localities are documented in Qoa within a 5-mile radius of the Project site.

These include five localities (1.115.4 – 1.115.7 and 1.115.11) within 2 miles of the Project site.

Construction monitoring in the 5-mile radius of the Project site uncovered 70 paleontological localities (including SBCM 1.114.56 – 1.114.90, SBCM 1.114.93 – 1.114.97, SBCM 1.114.131 – 1.114.46, SBCM

1.114.160 – 1.114.65, 1.114.206 – SBCM 1.114.208, and SBCM 1.114.290 – 294) situated within Qoa, 3 to 15 feet beneath the surface (Reynolds and Springer 1991).

Overall, the paleontological background research and SBCM records search results indicate that there is a medium paleontological sensitively and potential to encounter intact and fossiliferous soil deposition at and below depths as shallow as three feet below surface within the Project site.

However, the proposed Project would be required to comply with the City’s Policy Implementation Program (OS-14), which states that in the event paleontological resources are discovered during construction activities, construction shall be halted within 60 feet of the find and shall not resume until the Project Paleontologist can determine the significance of the find. If the Qualified Paleontologist determines that the discovery constitutes a significant resource under CEQA and it cannot be avoided, the City shall implement a paleontological data recovery program.

Program OS-14: Paleontological Resources. Future development proposals subject to environmental review pursuant to the California Environmental Quality Act (CEQA) are subject to the following provisions at the expense of the project proponent, as directed by the Development Services Director.

Paleontological Assessment. In areas containing middle to late Pleistocene era sediments (Qof) where it is unknown if paleontological resources exist, prior to grading an assessment shall be made by a qualified paleontological professional to establish the need for paleontologic monitoring. Should paleontological monitoring be required after recommendation by the professional paleontologist and approval by the Development Services Director, paleontological monitoring shall be implemented.

Paleontological Monitoring. A project that requires grading plans and is located in an area of known fossil occurrence or that has been demonstrated to have fossils present in a paleontological field survey or other appropriate assessment shall have all grading monitored by trained paleontologic crews working under the direction of a qualified professional, so that fossils exposed during grading can be recovered and preserved. Paleontologic monitors shall be equipped to salvage fossils as they are unearthed, to avoid construction delays, and to remove samples of sediments that are likely to contain the remains of small fossil invertebrates and vertebrates.

Monitors shall be empowered to temporarily halt or divert equipment to allow removal of abundant or large specimens. Monitoring is not necessary if the 535
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
43 potentially fossiliferous units described for the property in question are not present or if present are determined upon exposure and examination by qualified paleontologic personnel to have low potential to contain fossil resources. Should significant paleontological resources be discovered, paleontological recovery, identification, and curation shall be implemented.

Paleontological Recovery, Identification, and Curation. Qualified paleontologic personnel shall prepare recovered specimens to a point of identification and permanent preservation, including washing of sediments to recover small invertebrates and vertebrates. Qualified paleontologic personnel shall identify and curate specimens into the collections of the Division of Geological Sciences, San Bernardino County Museum or a similar established, accredited museum repository with permanent retrievable paleontologic storage. The paleontologist must have a written repository agreement in hand prior to the initiation of mitigation activities.

This measure is not considered complete until curation into an established museum repository has been fully completed and documented.

Paleontological Findings. Qualified paleontologic personnel shall prepare a report of findings with an appendix of itemized specimens subsequent to implementation of paleontological recovery, identification, and curation. A preliminary report shall be submitted to and approved by the Development Services Director before granting of building permits, and a final report shall be submitted to and approved by the Development Services Director before granting of occupancy permits.

Compliance with the City’s policies and local regulations, would ensure that impacts would remain less than significant.

3.8 GREENHOUSE GAS EMISSIONS

8. GREENHOUSE GAS EMISSIONS.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant impact on
the environment?
(b) Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?

3.8.1 Environmental Setting
An Air Quality, Energy, and Greenhouse Gas Analysis was prepared for the proposed Project and is included in Appendix A. The results of the analysis are summarized below. Constituent gases of the Earth’s atmosphere, called atmospheric GHGs, play a critical role in the Earth’s radiation amount by trapping infrared radiation from the Earth’s surface, which otherwise would have escaped to space. Prominent greenhouse gases contributing to this process include carbon dioxide (CO2), methane (CH4), ozone, water vapor, nitrous oxide (N2O), and chlorofluorocarbons (CFCs). This phenomenon, known as the Greenhouse Effect, is responsible for maintaining a habitable climate. Anthropogenic (caused or produced by humans) 536
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
44 emissions of these greenhouse gases in excess of natural ambient concentrations are responsible for the enhancement of the Greenhouse Effect and have led to a trend of unnatural warming of the Earth’s natural climate, known as global warming or climate change. Emissions of gases that induce global warming are attributable to human activities associated with industrial/manufacturing, agriculture, utilities, transportation, and residential land uses. Emissions of CO2 and N2O are byproducts of fossil fuel combustion. Methane, a potent greenhouse gas, results from off-gassing associated with agricultural practices and landfills. Sinks of CO2, where CO2 is stored outside of the atmosphere, include uptake by vegetation and dissolution into the ocean. Descriptions of each greenhouse gas and their global warming potential can be found in Appendix A.

Thresholds of Significance
As previously mentioned, the MDAQMD’s CEQA and Federal Conformity Guidelines (MDAQMD 2020), outlines significance determination thresholds. The MDAQMD Guidelines state that any project is significant if it triggers or exceed the most appropriate evaluation criteria, and further specifies that the emissions comparison (criteria number 1) is sufficient for most projects:

1. Generate total emissions (direct and indirect) in excess of the threshold provided in Table 3.8-1;

2. Generates a violation of any ambient air quality standard when added to the local background;

3. Does not conform with the applicable attainment or maintenance plan(s) ;

4. Exposes sensitive receptors to substantial pollutant concentrations, including those resulting in a cancer risk greater than or equal to 10 in a million and/or a Hazard Index (HI) (non-cancerous) greater than or equal to 1.

The MDAQMD significant emissions threshold for GHGs is shown in Table 3.8-1. Note that the emission thresholds are given as a daily value and an annual value, so that a multi-phased project (such as project with a construction phase and a separate operational phase) with phases shorter than one year can be compared to the daily value. Since construction of the proposed Project is anticipated to take over a year, the annual threshold has been utilized for both short-term construction impact analysis and long-term operational impacts.

Table 3.8-1. MDAQMD Significant Emissions Threshold for Greenhouse Gases Pollutant Annual Threshold
(tons)
Daily Threshold
(pounds)
Greenhouse Gases (CO2e) 100,000 548,000
Source: https://www.mdaqmd.ca.gov/home/showpublisheddocument?id=8510

3.8.2 Impact Analysis
a) Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Less than Significant Impact. The proposed Project would consist of development of a warehouse distribution facility. The proposed Project is anticipated to generate GHG emissions from construction activities and from operational activities that would include area sources, energy usage, mobile sources, off-road equipment, waste disposal, and water usage. 537
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
45 The MDAQMD shares responsibility with CARB for ensuring that all state and federal GHG standards are achieved and maintained within its jurisdiction. The MDAQMD CEQA Guidelines provides a project level significance threshold of 100,000 tons of CO2e per year for both construction and operational activities. The MDAQMD developed this threshold in order to comply with the GHG emission reductions required by AB 32.

The Project’s GHG emissions have been calculated with the CalEEMod model based on the construction and operational parameters detailed above. A summary of the results is shown below in Table 3.8-2 and the CalEEMod model run is provided in Appendix A of the Greenhouse Gas Technical Report.

Table 3.8-2. Project Related Greenhouse Gas Annual Emissions Greenhouse Gas Emissions (Metric Tons per Year)
Category CO2 CH4 N2O CO2e
Construction
Year 2023 332.88 0.07 <0.01 336.01
Year 2024 18.49 <0.01 <0.01 18.62
Total Construction Emissions 351.37 0.08 <0.01 354.63
Amortized Construction Emissions1 (30
Years) 11.71 <0.01 <0.01 11.82
Operations
Area Sources2 <0.01 0.00 0.00 <0.01
Energy Usage3 26.95 <0.01 <0.01 27.09
Mobile Sources4 372.44 0.02 0.05 387.29
Off-Road Equipment5 22.80 <0.01 0.00 22.99
Solid Waste6 9.50 0.56 0.00 23.54
Water and Wastewater7 30.25 0.38 <0.01 42.41
Total Operational Emissions 461.94 0.97 0.06 503.32
Total Annual Emission (Construction &
Operations) 473.65 0.97 0.06 515.14
Threshold of Significance 100,000
Exceed Thresholds? No
Notes:
1 Construction emissions amortized over 30 years as recommended in the SCAQMD GHG Working Group on November 19, 2009. 2 Area sources consist of GHG emissions from consumer products, architectural coatings, and landscaping equipment. 3 Energy usage consists of GHG emissions from electricity and natural gas usage. 4 Mobile sources consist of GHG emissions from vehicles. 5 Off-road equipment consists of emissions from forklifts utilized onsite (Project Design Feature 1 restricts the operation of dieselpowered forklifts, so forklifts have been analyzed as CNG-powered. 6 Waste includes the CO2 and CH4 emissions created from the solid waste placed in landfills. 7Water includes GHG emissions from electricity used for transport of water and processing of wastewater.

Source: CalEEMod Version 2020.4.0.
538
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
46 The data provided in Table 3.8-2 shows that the construction activities would create a total of 354.63 MTCO2e, which equates to 11.82 MTCO2e per year, when amortized over 30 years. The table also shows that operational activities would create 503.32 MTCO2e per year and when combined with the amortized construction emissions, the proposed Project would create a total of 515.14 MTCO2e per year, which is within the MDAQMD threshold of 100,000 MTCO2e per year.

Therefore, a less than significant generation of greenhouse gas emissions would occur from development of the proposed project. Impacts would be less than significant. b) Would the project conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less than Significant Impact. The proposed Project would consist of development of a warehouse distribution facility. As detailed above in Table 3.8-2, the proposed Project is anticipated to create 515.14 MTCO2e per year, which is well below the MDAQMD threshold of significance of 100,000 MTCO2e per year. The MDAQMD developed this threshold in order to meet the State GHG emissions reduction regulations that was based on substantial evidence supporting the use of the recommended thresholds. Therefore, the proposed Project would not conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases.

3.9 HAZARDS AND HAZARDOUS MATERIALS

9. HAZARDS AND HAZARDOUS MATERIALS.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
(b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
(c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
(d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or
the environment?
(e) For a project located within an airport land use plan or, where such a plan has not been adopted, within
2 miles of a public airport or public use airport, would the project result in a safety hazard or excessive
noise for people residing or working in the project
area?
(f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency
evacuation plan?
539
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
47 (g) Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury, or death involving wildland fires?

3.9.1 Impact Analysis
a) Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Less than Significant Impact. Construction activities would likely require the use of limited quantities of hazardous materials such as fuels, oils, and lubricants for construction equipment; paints and thinners; and solvents and cleaners. These hazardous materials are typically packaged in consumer quantities and used in accordance with manufacturer recommendations and would be transported to and from the Project site. The improper handling and transport of hazardous materials could result in adverse health effects to workers or the public.

Transportation of hazardous materials is regulated by the U.S. Department of Transportation and Caltrans. Together, federal and state agencies determine driver-training requirements, load labeling procedures, and container specifications designed to minimize the exposure of hazardous materials.

The San Bernardino County Fire Department (SBCFD), as the Certified Unified Program Agency (CUPA), would be responsible for ensuring compliance with these regulations including, but not limited to, the Hazardous Waste Control Act, the Hazardous Waste Generator Program, the Hazardous Materials Release Response Plans and Inventory Program, the California Accidental Release Prevention Program, and the Aboveground Storage Tank Program. Additionally, the Applicant would be required to comply with the City’s Local Hazard Mitigation Plan (City 2020).

Therefore, considering the comprehensive set of federal, state, and local laws and regulations that regulate the transportation, management, and disposal of hazardous materials and wastes, the potential for construction of the proposed Project to result in a significant hazard due to exposure of the public or the environment to hazardous materials or wastes during construction would be considered less than significant.

The use of common hazardous materials associated with maintenance activities and workplace functions would occur as part of the operation of the proposed Project. Hazardous chemicals common in similar settings include paints, lubricants, solvents, cleaning supplies and relatively small quantities of fuels, oils, and other petroleum-based products. Activities such as landscaping, can also become sources of releases of hazardous materials with pesticides and herbicides.

The Project would allow for delivery and export of auto parts, and electrical and fork-lift parts, some of which may contain small quantities of hazardous materials. Traditionally common hazards are handled and transported in small quantities, and because health effects associated with them with them are generally not as serious as industrial uses, operation of the new uses on site would not cause a significant impact with the routine use, transport, and disposal of general office and household hazardous materials.

As required by the SBCFD, any storage of hazardous materials and/or waste at the site would be required to submit business information and hazardous materials inventory forms contained in Hazardous Materials Management Plan and Hazardous Materials Business Plan. The SBCFD, as the 540
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
48 CUPA, requires all new businesses to follow applicable regulations and guidelines regarding storage and handling of hazardous waste. All hazardous materials are required to be stored and handled according to manufacturer’s directions and local, state and federal regulations including the Hazardous Waste Control Act (California Health and Safety Code Section 25100 et seq.), which is implemented by regulations described in Title 22 CCR. With adherence to existing regulatory requirements, the impact of the routine transport, use or disposal of hazardous materials associated with operation of the Project would be less than significant. b) Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Less than Significant Impact. As discussed above in Threshold a), construction activities would require the use of limited quantities of hazardous materials that are normal requirements of the construction process, including fuels, oils, and lubricants for construction equipment; paints and thinners; and solvents and cleaners. These materials would be transported to and from the Project site for use during construction activities. The improper handling and transport of hazardous materials could result in accidental release of hazardous materials, thereby exposing the public or the environment to hazardous materials.

Construction activities would disturb more than one acre and, thus, would be required to implement requirements of the National Pollutant Discharge Elimination System (NPDES) General Construction Permit. This permit requires implementation of best management practices (BMPs) that would include measures to address the safe handling of hazardous materials, and in the unlikely event of an inadvertent release, also requires spill response measures to contain any release of hazardous materials. The use of construction BMPs implemented as part of a Storm Water Pollution Prevention Plan (discussed further in Section 3.10, Hydrology and Water Quality) as required by the NPDES General Construction Permit would minimize the potential adverse effects from accidental release of hazardous materials or wastes. If a spill of hazardous materials on the construction site were to occur, the spilled materials would typically be relatively localized because of the relatively small quantities involved and would be cleaned up in a timely manner in accordance with identified BMPs.

With the required protective measures (including BMPs) and the quantities of hazardous materials typically needed for construction projects, including the proposed Project, the potential hazard or threat to the public or environment from upset and accident conditions during construction hazards would be considered less than significant.

The Project would allow for delivery and export of auto parts, and electrical and fork-lift parts, some of which may contain small quantities of hazardous materials. Additionally, storage of other materials on site may be required and may include fuels, oils, solvents, cleaning products or landscaping pesticides or herbicides. Any use of hazardous materials during the operation of the proposed Project would be required to adhere to the provisions of programs administered by the SBCFD as the CUPA and in compliance with the City’s Local Hazard Mitigation Plan (City 2020). With compliance with the existing agencies, and adherence to existing regulations impacts associated with hazardous materials in regards to potential hazards to the public and environment, would be less than significant. 541
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
49 c) Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? No Impact. The closest school to the site is Victoria Magathan Elementary school which is located approximately 0.8 miles southwest of the Project site. No schools are located within a quarter mile of the Project site and as a result there would be no impact related to emissions or handling of hazardous materials within a quarter mile of a school.
d) Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
No Impact. The Project will not be located on a site that is included on a list of hazardous materials sites that are currently under remediation. According to the California State’s GeoTracker and Envirostor website (consistent with Government Code Section 65962.5), which provides information regarding Leaking Underground Storage Tanks (LUST), there are no active LUST sites located within the Project site, or within a 1,000-foot radius of the site (SWRCB 2022, DTSC 2022). Therefore, the proposed Project will not create a significant hazard to the population or to the environment. No impacts would occur.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Less than Significant Impact. The proposed Project is located just over 2 miles southwest of the Southern California Logistics Airport (SCLA) and is not located within the SCLA boundaries.

Additionally, the Project would have a maximum height of 38 feet and 4 inches. Given the proximity from the airport, the proposed building height is not anticipated to interfere with airport operations.

Therefore, impacts would be less than significant.
f) Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Less than Significant Impact. Construction activities would be located within the Project site. Vehicles traveling to and from the Project site would utilize Highway 395 to access the site via Adelanto Road.

The City of Adelanto does not identify any evacuation routes within the City, though Highway 395 is the logical north-south regional connecting roadway within the City. No road closures would be required as part of construction of the Project. To ensure adequate circulation during operation, the proposed onsite parking and circulation plans will be reviewed by the local Fire Department and Police Department to ensure that the Project’s ingress/egress are adequate for accommodating emergency vehicles. Finally, a construction traffic plan will be required to be submitted to the Fire Department prior to development in order to provide adequate emergency access during construction of the proposed Project. Therefore, the Project would have less than significant impacts on the emergency evacuation plan.
g) Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
542
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
50 Less Than Significant Impact. According to the CAL FIRE, there are no fire hazard zones within the City of Adelanto that are of state responsibility; furthermore, there are no very high fire hazard zones of local responsibility (CalFire 2022). The proposed Project is located in a flat rural area with native desert vegetation within and surrounding the site. This is an area with very little fuel load in the surrounding area that could be susceptible to wildfires. Therefore, because the proposed Project is located outside of the area identified as a high fire hazard zone by CAL FIRE, the proposed Project has a less than significant potential to expose people or structures to a significant risk of loss, injury or death involving wildland fires. No mitigation is required.

3.10 HYDROLOGY AND WATER QUALITY

10. HYDROLOGY AND WATER QUALITY.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or ground water quality?
(b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge
such that the project may impede sustainable
groundwater management of the basin?
(c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of
the course of a stream or river or through the
addition of impervious surfaces, in a manner which
would:
i) Result in substantial erosion or siltation on- or offsite; ii) Substantially increase the rate or amount of
surface runoff in a manner which would result in
flood on- or off-site;
iii) Create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide substantial
additional sources of polluted runoff; or
iv) Impede or redirect flood flows?
(d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
(e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater
management plan?

3.10.1 Impact Analysis
a) Would the project violate any water quality standards or waste discharge requirements, or otherwise substantially degrade surface or ground water quality?
Less than Significant Impact. The proposed Project is located within a developed area within the Mojave River watershed, which is within the Adelanto Planning Area of the Lahontan Regional Water Quality Control Board (RWQCB). The City of Adelanto Water Department (AWD) is responsible for the water supply to the City. The City’s water supply comes solely from groundwater production from 15 543
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
51 potable wells in three pressure zones, transmission and distribution pipelines, booster stations and reservoirs. AWD is required to meet potable water quality requirements of the Division of Drinking Water, State Water Resources Control Board (SWRCB), as well as the California Department of Public Health. Typically, the three main sources of potential violation of water quality standards or waste discharge requirements are from generation of municipal wastewater, stormwater runoff, and potential discharges of pollutants, such as accidental spills. Municipal wastewater is delivered to AWD, and is processed at the City’s activated sludge wastewater treatment facility (WTF) through an operations and maintenance contract with PERC Water Corporation, which meets the waste discharge requirements imposed by the RWQCB.

Project construction would require temporary disturbance of surface soils and removal of vegetative cover through grading and excavation for the Project. Grading activities therefore could potentially result in erosion and sedimentation on site, which may alter the existing drainage pattern. The Project site is relatively flat, so the potential for soil erosion is low, but peak stormwater runoff could result in short-term sheet erosion in areas of exposed soils.

The Project would be required to obtain coverage under a Construction General Permit to comply with NPDES requirements. Compliance with the Construction General Permit would require the development and implementation of a SWPPP and associated BMPs. The BMPs would include measures that would be implemented to prevent discharge of eroded soils from the construction site and sedimentation of surface waters off site. Given the relatively flat topography of the site and implementation of the required SWPPP, construction of the Project would not violate any water quality standards or waste discharge requirements.

Once developed, the Project will increase the imperviousness on the site from its existing conditions with the addition of parking lot and warehouse facility. To prevent significant impacts due to increased runoff at the Project site, stormwater would be collected on site and directed towards two catch basins located in the parking lot area. With implementation of these design features, Project operations would not substantially degrade surface or groundwater quality; impacts would be less than significant.
b) Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Less than Significant Impact. The Project will be supplied water by the AWD, which utilizes groundwater to supply its customers. As further described in Section 3.19 Utilities and Service Systems below, water demand would be expected to be around 5,944 gallons per day or 6.7 acre feet per year (AFY). The Urban Water Management Plan (UWMP) prepared for the City, notes that by 2025, the City would demand a total of 4,996 AFY of water (City 2021). The proposed Project would represent 0.13 percent of the City’s projected water demand by 2025, which is a nominal amount. Furthermore, the 2020 UWMP indicates that AWD’s planned water supply meets demand from 2020-2040 (City 2021).

Therefore, impacts to groundwater supplies or basins would be less than significant. c) Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
544
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
52 i) result in substantial erosion or siltation on- or off-site; Less Than Significant Impact. Project construction would require temporary disturbance of surface soils and removal of vegetative cover through grading and excavation. Grading activities therefore could potentially result in erosion and sedimentation. The Project site is relatively flat; therefore, the potential for soil erosion is low; however, peak stormwater runoff could result in short-term sheet erosion in areas of exposed soils. Compliance with the Construction General Permit would require the development and implementation of a SWPPP and associated BMPs.

Impacts related to erosion and siltation are less than significant. ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site;
Less than Significant Impact. Implementation of the Project will increase the imperviousness on the site with the addition of the Project on the currently mostly undeveloped land. To prevent significant impacts due to increased runoff at the Project site, stormwater would be collected on site and directed towards two catch basins located in the parking lot area. This system will be designed to capture the peak 100-year flow runoff from the Project site or otherwise be detained on site and discharged in conformance with San Bernardino County requirements. Thus, the implementation of onsite drainage improvements and applicable requirements will ensure that stormwater runoff will not substantially increase the rate or volume of runoff in a manner that would result in flooding on- or off-site. Impacts would be less than significant. iii) create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources or polluted runoff; or Less than Significant Impact. As indicated above, the Project will not substantially create or contribute runoff water that would exceed the capacity of existing or planned stormwater capacity, or provide substantial additional sources of polluted water, particularly because the site plan includes catch basins that would be installed in the parking lot area; and other water quality control measures that will collect on-site runoff. The Project will require the implementation of a SWPPP, which will ensure that discharge of polluted material does not occur or is remediated in the event of an accidental spill. At present, the site is mostly pervious and runoff is either retained on site or is directed into adjacent public rights-of-way; thus, with the development of the site as proposed and through development of the planned drainage systems, runoff from the site would be managed more efficiently than that which exists at present. Thus, the implementation of onsite drainage improvements and applicable requirements will ensure that that drainage and stormwater will not create or contribute runoff that would exceed the capacity of existing or planned offsite stormwater drainage systems or provide substantial additional sources of polluted runoff. Impacts would be less than significant.
iv) impede or redirect flood flows?
Less than Significant Impact. The Project site does not contain any streams or rivers having the potential to be altered by the Project. In addition, according to Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) Panel 06071C5795H, the Project site is designated as Flood Zone X, with a low likelihood of flooding and is not located within a FEMA 545
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
53 100-year flood hazard zone (FEMA 2022). Therefore, impacts associated with impeding or redirecting flood flows would be less than significant. d) Would the project in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
No Impact. The Project would not be susceptible to flood hazards, tsunami, or seiche. Seiche is generally associated with oscillation of enclosed bodies of water typically caused by ground shaking associated with a seismic event; however, the Project site is not located near an enclosed body of water. Flooding from tsunami conditions is not expected since the Project site is located approximately 67 miles from the Pacific Ocean. In addition, the Project site and immediate surrounding area is not located within a flood zone, thus the Project would not risk release of pollutants due to inundation. Therefore, no impacts associated with seiche, tsunami, or flooding would occur.
e) Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less than Significant Impact. Please refer to the discussion under issue 3.10.1(b) above. The “2019 Sustainable Groundwater Management Basin Prioritization: Process and Results” document, prepared by the State of California Department of Water Resources, indicates that the Mojave River Basin, which underlies the proposed Project, is under very low priority (SGMA 2020). As stated in the 2019 Basin Prioritization, of the 515 groundwater basins in California, 94 are prioritized as high and medium and 421 are prioritized as low and very low. The Mojave River Basin does not have a sustainable groundwater management plan and the Project will not interfere with the overall water quality of the basin as discussed above. Furthermore, compliance with the State water conservation measures is enforced through AWD visits to operations, such as the proposed Project. As such, the proposed Project would not have a significant potential to conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan and impacts would be less than significant.

3.11 LAND USE AND PLANNING

11. LAND USE/PLANNING
Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Physically divide an established community?
(b) Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?

3.11.1 Impact Analysis
a) Would the project physically divide an established community? Less than Significant. The Project is proposed on a mostly vacant site that is bordered to the north and south by existing industrial uses consisting of self-storage facilities. No other development is 546
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
54 within the vicinity of the Project site. The proposed Project, would infill development between two existing businesses and would not physically divide any existing communities. Impacts would be less than significant.
b) Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Less than Significant. The Project site has a land use designation and zoning of LM. As shown in Figure 5, existing LM uses are directly east of the Project site and the area in the City known as ‘Light Manufacturing District East’, which allows for limited manufacturing, warehousing, and solar/wind.

Implementation of the Project would not result in a land use or zoning designation that would be surrounded by a different land use or zoning designation, also referred to as ‘island’ land use or zoning designations.

Additionally, the existing uses north and south of the Project site are largely similar to those of the proposed Project, therefore the proposed uses would be consistent. As shown in Table 3.11-1 below, the Project would be consistent with the applicable land use policies as noted in the Adelanto North 2035 Sustainable Plan.

Table 3.11-1. Land Use and Community Design Policies Consistency Analysis Land Use and Community Design Policies Consistency
Goal LC 3: Diverse employment and business opportunities.

LC 3.1 Establish business and employment
land use designations to support
employment and economic
development.

Consistent. The proposed Project would
develop a warehouse facility that would
employee 20 persons full-time.

LC 3.2 Accommodate industrial, logistics, and
warehousing uses to complement the
SCLA in the Airport Development
District, Business Park District, and Light
Manufacturing District East. Ensure the
sustainable concepts and practices
described in Policy OS 3.2, OS 3.5, OS

4.5, OS 6.1, OS 6.2, OS 6.3, OS 8.2, OS

9.1 are implemented.

Consistent. The proposed Project would
develop a warehouse facility just over 2
miles from the SCLA. The sustainable
concepts listed are analyzed below.

LC 3.3 Provide neighborhood, community and
regional commercial services, and retail
uses to support the neighborhoods.

Consistent. The proposed Project would
develop a warehouse facility that would
allow for delivery and export of auto parts,
and electrical and fork-lift parts that would
be used by the City.

LC 3.4 Provide incentives to encourage
businesses to locate within the Mixed
Use, Business Park, Light
Manufacturing, and
Manufacturing/Industrial land use
designations.

Consistent. The proposed Project would be
located in the LM land use and zoning
designation.

Goal LC 4: Sustainability incorporated into land use patterns and development approaches.

LC 4.3 Create a sustainable community that is
responsive to the environmental,
Consistent. The Project would be required
to adhere to CalGreen Building Code
547
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
55 water, and energy conservation needs
of the region and local area.

Standards which establish mandatory green
building standards for all buildings in
California. The code covers five categories:
planning and design, energy efficiency,
water efficiency and conservation, material
conservation and resource efficiency, and
indoor environmental quality. The
CALGreen code, includes insulation and
design provisions to minimize wasteful
energy consumption including low flow
toilets, and energy efficient equipment.

Compliance with these regulations would
improve the efficiency of the overall
Project.

Goal LC 5: Adequate infrastructure to meet new development growth.

LC 5.1 Require new development to pay its
fair share of the cost of public facilities,
services, and infrastructure, including
but not limited to transportation,
incremental water supply, sewer and
wastewater treatment, solid waste,
flood control and drainage, schools, fire
and police protection, and parks and
recreation.

Consistent. As further described in Section

3.15 Public Services, the proposed Project
would be require to pay fair share of
services where applicable.

Goal LC 6 Natural desert habitat/wildlife and limited residential development/ recreational opportunities are within Open Spaces and Green Belt Corridors.

LC 6.1 Minimize direct or indirect impacts to
sensitive biological resources while
optimizing the potential for mitigation.

Consistent. As further described in Section

3.4 Biological Resources, the proposed
Project would implement mitigation
measures for biological resources such that
impacts would be less than significant.

Goal LC 7: Passive solar design and green building practices take advantage of Adelanto’s solar and wind conditions.

Consistency analysis with policies LC 7.1-7.11 are in Table 3.6-1.

LC 7.12 Encourage all plumbing fixtures be
certified low water use, and encourage
the use of 1/8th gallon urinals (or
similar) and dual-flush toilets.

Consistent. The Project would be required
to adhere to CalGreen Building Code
Standards which establish mandatory green
building standards for all buildings in
California. The code covers five categories:
planning and design, energy efficiency,
water efficiency and conservation, material
conservation and resource efficiency, and
indoor environmental quality. The
CALGreen code, includes insulation and
design provisions to minimize wasteful
energy consumption including low flow
toilets, and energy efficient equipment.

Compliance with these regulations would
improve the efficiency of the overall
Project.

LC 7.18 Minimize or eliminate construction
waste. Encourage the reduction,
Consistent. As further described in Section

3.19 Utilities and Service systems, the
548
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
56 reusing, and/or recycling of waste
materials to minimize disposal to a
landfill.

Project would be required to comply with
AB 939 and AB 341, which state the City
must divert at least 50 percent of its annual
waste and set a 75 percent recycling goal
for California by 2020.

Goal LC 14: Well-planned and high quality industrial and business parks.

LC 14.4 Design loading areas with adequate
spacing for truck maneuvering without
encroaching onto the adjoining street.

Consistent. The proposed Project is a
warehouse facility that would require
deliveries from trucks. The facility would be
built to accommodate the trucks without
encroaching on the adjoining street.

LC 14.5 Provide the highest level of articulation
and architectural features along the
front façade.

Consistent. The proposed Project would be
required to adhere to the City’s zoning code
and general plan which specifies type and
usage for building material and architectural
features for all projects.

LC 14.6 Require high quality and well designed
signage to direct pedestrians and
vehicles to loading and receiving, visitor
parking, and other special uses.

Consistent. The proposed Project would be
required to adhere to the City’s zoning code
and general plan which specifies type and
usage of signage for all projects.

Goal LC 17: A more aesthetically pleasing environments with landscape materials that reflect the Mojave Desert environment
LC 17.1 Use landscaping to reflect a ‘sense of
place’ that blends in with Mojave
Desert and native plant materials.

Consistent. Landscaping would be
consistent with desert type species and
would be low water requirement with
minimal irrigation. Landscaping would
surround the site and occupy approximately

10.85% of the parcel.

LC 17.2 Provide landscaping plants and
materials that complement the Mojave
Desert environment and wildlife, lower
maintenance requirements, and require
low to moderate irrigation
requirements.

Consistent. Landscaping would be
consistent with desert type species and
would be low water requirement with
minimal irrigation. Landscaping would
surround the site and occupy approximately

10.85% of the parcel.

LC 17.4 Use irrigation systems that utilize water
conserving methods and incorporate
water efficient technologies.

Consistent. Landscaping would be
consistent with desert type species and
would be low water requirement with
minimal irrigation. Landscaping would
surround the site and occupy approximately

10.85% of the parcel.

LC 17.5 Incorporate sustainable landscaping
methods in all new development
projects and public realm
improvements.

Consistent. Landscaping would be
consistent with desert type species and
would be low water requirement with
minimal irrigation. Landscaping would
surround the site and occupy approximately

10.85% of the parcel.

Goal OS 3: Energy conservation and renewable energy production is maximized to reduce natural resources and fossil fuels consumption.

OS 3.1 Promote the use of renewable energy
and support efforts to develop smallscale, distributed energy (e.g., solar Consistent. The proposed warehouse will
be designed to meet the 2019 Title 24 Part
6 building standards that require that new
549
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
57 power and wind power) to reduce the
amount of electricity drawn from the
regional power grid, while providing
Adelanto with a greater degree of
energy self-sufficiency.
non-residential buildings be designed to be
“solar ready” that includes structurally
designing the roof to support solar PV
panels and installation of electrical conduit
to support PV panels.

OS 3.2 Encourage new warehousing,
manufacturing, industrial, and large
commercial retail buildings to be
designed to accommodate future
rooftop solar panel systems.

Consistent. The proposed warehouse will
be designed to meet the 2019 Title 24 Part
6 building standards that require that new
non-residential buildings be designed to be
“solar ready” that includes structurally
designing the roof to support solar PV
panels and installation of electrical conduit
to support PV panels.

OS 3.5 Require all new development to
provide site design and building
orientation that take into account
passive solar design to reduce heating
and cooling loads through energyefficiency strategies.

Consistent. As mentioned previously, the
proposed Project would be oriented on an
east-west access in order to minimize
western sun exposure.

OS 3.8 Conserve energy by promoting efficient
and cost-effective lighting that reduces
glare and light pollution.

Consistent. All lighting on the project site
will be required to meet the CalGreen
Building Standards, which require the
installation of LED or other energy efficient
lighting and also requires the use of lighting
controls that automatically dim or turn off
lights when sensors determine that no
people are in the area.

Goal OS 4: Water consumption is reduced through aggressive implementation of conservation policies and programs.

OS 4.5 Provide for recycled water distribution
by requiring recycled water dual piping
in new developments, retrofitting
existing landscaped areas, and
constructing recycled water pumping
stations and transmission mains to
reach areas far from the treatment
plants.

Consistent. The City currently does not
distribute recycled water, therefore the
Project cannot currently plan for recycled
water consumption. However, if it does
become available, the Applicant will
evaluate the possibility of utilizing recycled
water for landscaping needs.

Goal OS 6: Local air quality is good; local contributions of airborne pollutants to the air basin is reduced.

OS 6.1 Pursue efforts to reduce air pollution
and greenhouse gas emissions by
promoting the use of renewable energy
(e.g., solar and wind power), and
implement effective energy
conservation and efficiency measures.

Consistent. The proposed warehouse will
be designed to meet the 2019 Title 24 Part
6 building standards that require that new
non-residential buildings be designed to be
“solar ready” that includes structurally
designing the roof to support solar PV
panels and installation of electrical conduit
to support PV panels.

OS 6.2 Integrate air quality planning with land
use, economic development, and
transportation planning.

Consistent. The proposed Project would
infill development between two existing
developments on a parcel otherwise
currently underdeveloped. Required utilities
including roadways are nearby for easy
550
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
58 connections and would not require
extensive construction to connect to.

OS 6.3 Require projects that generate
potentially significant levels of air
pollutants and odors to incorporate the
most effective air quality mitigation
into project design, as feasible.

Consistent. As discussed in Section 3.2, Air
Quality above, the proposed Project would
not have any impacts on air quality or
odors.

Goal OS 8: Greenhouse gas emissions are minimized due to the efficient use and management of energy resources.

OS 8.2 Reduce greenhouse gas emissions
caused from the use of electricity and
natural gas by residential, commercial,
industrial, and municipal buildings.

Consistent. The Project would be required
to adhere to CalGreen Building Code
Standards which establish mandatory green
building standards for all buildings in
California. The code covers five categories:
planning and design, energy efficiency,
water efficiency and conservation, material
conservation and resource efficiency, and
indoor environmental quality. The
CALGreen code, includes insulation and
design provisions to minimize wasteful
energy consumption including low flow
toilets, and energy efficient equipment.

Compliance with these regulations would
improve the efficiency of the overall
Project.

Goal OS 9: Sustainable neighborhood development principles, green infrastructure, and green buildings are found throughout Adelanto North.

OS 9.1 Encourage and support green building
principles in Adelanto
Consistent. The Project would be required
to adhere to CalGreen Building Code
Standards which establish mandatory green
building standards for all buildings in
California. The code covers five categories:
planning and design, energy efficiency,
water efficiency and conservation, material
conservation and resource efficiency, and
indoor environmental quality. The
CALGreen code, includes insulation and
design provisions to minimize wasteful
energy consumption including low flow
toilets, and energy efficient equipment.

Compliance with these regulations would
improve the efficiency of the overall
Project.

Since the Project would be consistent with the applicable land use policies and the proposed uses would be consistent with the LM land use designation and zoning, impacts would be less than significant.
551
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
59 3.12 MINERAL RESOURCES

12. MINERAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Result in the loss of availability of a known mineral resource that would be of value to the region and the
residents of the state?
(b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local
general plan, specific plan or other land use plan?

3.12.1 Impact Analysis
a) Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b) Would the project result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. The proposed site for the project is located within land designated for mixed use, which is a designation that does not include mining operations as a permitted use. According to the Adelanto North Sustainable Plan, the only designation in which mineral resource mining is permitted, are in Open Space uses (City 2014). Additionally, CalGem Well Finder shows no wells on the Project site or in the area (CalGem 2022). Given that the Project site does not have an open space designation, and does not currently extract any minerals on site, , the development of the Project will not cause any loss of mineral resource values to the region or residents of the state, nor would it result in the loss of any locally important mineral resources identified in the City’s General Plan. No impacts would occur.

3.13 NOISE

13. NOISE
Would the project result in:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable
standards of other agencies?
(b) Generation of excessive groundborne vibration or
groundborne noise levels?
(c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a
plan has not been adopted, within two miles of a
public airport or public use airport, would the project expose people residing or working in the project area
to excessive noise levels?
552
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
60 3.13.1 Environmental Setting
Noise is generally described as unwanted sound. The Project has two storage facilities located to the north and south of the Project site, with the US-395 to the west, and vacant land to the east.

The unit of sound pressure ratio to the faintest sound detectable to a person with normal hearing is called a decibel (dB). Sound or noise can vary in intensity by over one million times within the range of human hearing. A logarithmic loudness scale, similar to the Richter scale for earthquake magnitude, is therefore used to keep sound intensity numbers at a convenient and manageable level. The human ear is not equally sensitive to all sound frequencies within the entire spectrum. Noise levels at maximum human sensitivity from around 500 to 2,000 cycles per second are factored more heavily into sound descriptionsin a process called “A-weighting,” written as “dBA.”
Leq is a time-averaged sound level; a single-number value that expresses the time-varying sound level for the specified period as though it were a constant sound level with the same total sound energy as the time-varying level. Its unit is the decibel (dB). The most common averaging period for Leq is hourly.

Because community receptors are more sensitive to unwanted noise intrusion during more sensitive evening and nighttime hours, state law requires that an artificial dBA increment be added to quiet time noise levels. The State of California has established guidelines for acceptable community noise levels that are based on the Community Noise Equivalent Level (CNEL) rating scale (a 24-hour integrated noise measurement scale). The guidelines rank noise land use compatibility in terms of "normally acceptable," "conditionally acceptable," and "clearly unacceptable" noise levels for various land use types. The State Guidelines, Land Use Compatibility for Community Noise Exposure, single-family homes are "normally acceptable" in exterior noise environments up to 60 dB CNEL and "conditionally acceptable" up to 70 dB CNEL based on this scale. Multiple family residential uses are "normally acceptable" up to 65 dB CNEL and "conditionally acceptable" up to 70 CNEL. Schools, libraries and churches are "normally acceptable" up to 70 dB CNEL, as are office buildings and business, commercial and professional uses with some structural noise attenuation.

3.13.2 Impact Analysis
a) Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less than Significant Impact.

Construction
Short-term construction noise impacts associated with the proposed Project will occur in phases as the Project site is developed. The earth-moving sources are the noisiest type of equipment typically ranging from 82 to 85 dB at 50 feet from the source. Construction equipment generates noise that ranges between approximately 75 and 90 dBA at a distance of 50 feet. Table 3.13-1 shows construction equipment noise levels at 25, 50 and 100 feet from the noise source. Section 17.90.020 of the Adelanto Municipal Code limits the hours of construction as follows:
553
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
61 To reduce potential noise and air quality nuisances, the following items shall be listed as “General Notes” on the construction drawings:

Construction activity and equipment maintenance is limited to the hours between 7:00 a.m. to dusk on weekdays. Construction may not occur on weekends or State holidays, without prior consent of the Building Official. Non-noise generating activities (e.g. interior painting) are not subject to these restrictions. City and State construction projects, such as road re-building or resurfacing, and any construction activity that is in response to an emergency, shall be exempt from this requirement.

Table 3.13-1. Noise Levels of Construction Equipment at 25, 50, and 100 Feet (in dBA Leq) from the Source
Equipment Noise levels at 25 feet Noise Levels at 50
Feet
Noise Levels at 100
Feet
Earth Moving
Front Loader 85 79 73
Backhoes 86 80 74
Dozers 86 80 74
Tractors 86 80 74
Scrapers 91 85 79
Trucks 91 85 79
Material Handling
Concrete Mixer 91 79 70
Concrete Pump 84 78 72
Crane 89 83 77
Derrick 94 88 82
Stationary Sources
Pumps 82 79 70
Generator 84 78 72
Compressors 87 81 75
Other
Saws 84 78 72
Vibrators 82 76 70
Source: U. S. Environmental Protection Agency “Noise from Construction Equipment and Operations, Building Equipment, and Home Appliances” December 31, 1971
The Adelanto Municipal Code also limits stationary construction equipment from exceeding 65 dBA at the nearest residence, and enforces that all construction related truck trips must be limited to the Adelanto designated truck routes. The proposed Project would be constructed in compliance with the City’s Noise Performance Standards, and therefore construction of the Project would be less than significant.

Operations
Noise generated as a result of the Project would attenuate to a less than significant level, or an inaudible level by the time it reached the residences approximately 2,500 feet to the south. The primary source of noise generated as a result of the operation of the warehouse facility will be vehicular traffic entering, exiting and accessing the site, maintenance equipment that may be required 554
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
62 as needed, heating, ventilation and air conditioning units. The City of Adelanto does not identify exterior noise standards for industrial land uses; but indicates that, unless a sensitive use in proximity to a site would be impacted, industrial uses do not have a CNEL limit within which to operate. Noise attenuates at a rate of approximately 6 to 7 decibels per doubling of distance, and much like construction noise, equipment required to operate the warehouse facility will generate some noise, it would be consistent with noise produced by the adjacent storage facilities. Given the distance from the nearest residence to the Project site—about 2,500 feet to the south—the noise environment at the nearest residence will be well within the levels deemed acceptable by the City. With no sensitive receptors nearby, the proposed Project would not expose of persons to or generation of noise levels in excess of established standards. Thus, based on the existing noise environment within this industrial corridor, neither operation or construction of the proposed Project would violate noise standards outlined in the City of Adelanto Development Code. Impacts would be less than significant. b) Would the project result in generation of excessive groundborne vibration or groundborne noise levels?
Less than Significant Impact. Vibration is the periodic oscillation of a medium or object. The rumbling sound caused by vibration of room surfaces is called structure borne noises. Sources of groundborne vibrations include natural phenomena (e.g. earthquakes, volcanic eruptions, sea waves, landslides) or human-made causes (e.g. explosions, machinery, traffic, trains, construction equipment). Vibration sources may be continuous or transient. Vibration is often described in units of velocity (inches per second), and discussed in decibel (dB) units in order to compress the range of numbers required to describe vibration. Vibration impacts related to human development are generally associated with activities such as train operations, construction, and heavy truck movements.

The Federal Transit Authority (FTA) Noise and Vibration Assessment states that in contrast to airborne noise, ground-borne vibration is not a common environmental problem (FTA 2006). Although the motion of the ground may be noticeable to people outside structures, without the effects associated with the shaking of a structure, the motion does not provoke the same adverse human reaction to people outside. Within structures, the effects of ground-borne vibration include noticeable movement of the building floors, rattling of windows, shaking of items on shelves or hanging on walls, and rumbling sounds. The FTA Assessment further states that it is unusual for vibration from sources such as buses and trucks to be perceptible, even in locations close to major roads. However, some common sources of vibration are trains, trucks on rough roads, and construction activities, such as blasting, pile driving, and heavy earth-moving equipment. The FTA guidelines identify a level of 80 VdB for sensitive land uses. This threshold provides a basis for determining the relative significance of potential Project related vibration impacts.

Due to the relatively compact size of the Project site, and the lack of any sensitive receptors within a reasonable distance of the Project site, the proposed Project will not expose people to generation of excessive groundborne vibration or groundborne noise levels. During construction, certain construction activities have some potential to create vibration, but due to the size of the site and lack of sensitive receptors, any impacts are considered less than significant. Furthermore, the City of Adelanto Municipal Code Section 17.90.030 places restrictions on vibration such that no ground vibration shall be allowed which can be felt without the aid of instruments at or beyond the subject property line. The proposed Project would comply with this restriction because no sensitive receptors exist within the vicinity of the Project that would be impacted by project related vibration.

Additionally, because the rubber tires and suspension systems of heavy trucks and other on-road 555
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
63 vehicles provide vibration isolation and reduced noise, it is unusual for on-road vehicles to cause noticeable groundborne noise or vibration impact. Most problems with on-road vehicle-related noise and vibration can be directly related to a pothole, bump, expansion joint, or other discontinuity in the road surface. The proposed Project would be constructed with smooth new pavement throughout the Project and would not result in significant groundborne noise or vibration impacts from vehicular traffic. Thus, any impacts under this issue are considered less than significant c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public us airport, would the project expose people residing or working in the project area to excessive noise levels? No Impact. The proposed Project is located over two miles from the nearest airport, SCLA, and is not located within any airport plan boundaries. No impact regarding noise levels adjacent to an airport would occur.

3.14 POPULATION AND HOUSING

14. POPULATION AND HOUSING.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Induce substantial unplanned population growth in
an area, either directly (for example, by proposing
new homes and businesses) or indirectly (for
example, through extension of roads or other
infrastructure)?
(b) Displace substantial numbers of existing people or
housing, necessitating the construction of
replacement housing elsewhere?

3.14.1 Impact Analysis
a) Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Less Than Significant Impact. The proposed Project will employ about 20 persons in support of Project operations, and about 30 persons in support of construction of the proposed Project. Implementation of the Project would not result in the construction of new homes or result in the extension of roads or other infrastructure. Construction of the Project would result in the generation of temporary construction jobs; however, the additional jobs are expected to be filled by residents who currently live in the area. In addition, new jobs generated by the operation of the facility are also expected to be filled by nearby residents; therefore, the jobs would not result in the relocation of any population.

The Project would not directly or indirectly induce substantial population growth through the creation of new homes or businesses, and impacts would be less than significant. b) Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
556
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
64 No Impact. No occupied structures exist within the Project site and as such, no residences or persons are located on the Project site; therefore, implementation of the proposed Project will not displace substantial numbers of existing housing or persons, necessitating the construction of replacement housing elsewhere. No impacts will occur.

3.15 PUBLIC SERVICES

15. PUBLIC SERVICES. Potentially Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Would the project result in substantial adverse
physical impacts associated with the provision of
new or physically altered governmental facilities,
need for new or physically altered governmental
facilities, the construction of which could cause
significant environmental impacts, in order to
maintain acceptable service ratios, response times or
other performance objectives for any of the public
services:
i) Fire Protection?
ii) Police Protection?
iii) Schools?
iv) Parks?
v) Other public facilities?

3.15.1 Impact Analysis
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for fire protection? Less Than Significant Impact. The San Bernardino County Fire Department (SBCFD) provides fire protection and emergency medical services for the City. It would take approximately 5 minutes for SBCFD to reach the site from Station #322 (Google 2022). Emergency access to the Project site will be provided by the entrance on Adelanto Road. The proposed Project will incrementally add to the existing demand for fire protection services. Cumulative impacts are mitigated through the payment of a Fire Impact Fee, which is intended to provide funds directed towards fire protection. Additionally standard conditions will be imposed by the City and the Fire Department to ensure adequate fire flow at the proposed Project. Therefore, impacts are expected to be less than significant. b) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for police protection? Less Than Significant Impact. The City of Adelanto receives police services through the San Bernardino County Sheriff Department. The Department enforces local, state, and federal laws; performs investigations and makes arrests; administers emergency medical treatment; and responds to County 557
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
65 emergencies. The Victor Valley Patrol Station is located at 11613 Bartlett Avenue, Adelanto, California 92301. The Victor Valley Station has one captain, one lieutenant, eight sergeants, seven detectives, fifty eight patrol deputies, three sheriff’s service specialist, seven office specialists, two office assistants, one secretary and one automotive officer. The proposed Project will result in a marginal increase in demand for police services. Access to the site for Police protection services will be provided at the entrance to the Project site on Adelanto Road. These incremental impacts are mitigated through the contribution to the City’s General Fund through revenues generated by the Project.

Therefore, impacts are expected to be less than significant. c) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for schools? No Impact. The proposed Project is a warehouse facility that as discussed in Section 3.14 Population and Housing, is not expected to result in an increase to the existing population, and would therefore, not result in an increase in students or need for schools. The Adelanto Elementary School District and the Victor Valley Union High School District requires residential and commercial developments to pay School District Fees. Industrial projects such as the proposed Project are not required to pay these fees. Therefore, no impacts would occur.
d) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for parks? No Impact. As previously mentioned, the proposed Project is not expected to result in an increase to the existing population, and would therefore, not result in an increase to park usage. The proposed Project will not directly add to the existing demand on local recreational facilities. The City of Adelanto collects a park and recreation impact fee from residential projects. At present, the City does not require industrial projects such as the proposed Project, to contribute fees to parks and recreation.

Therefore, no impacts on parks and recreation facilities would occur. e) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for other public facilities? Less Than Significant Impact. Other public facilities include library and general municipal services.

Since the Project will not directly induce substantial population growth, it is not forecast that the use of such facilities will substantially increase as a result of the proposed Project. The Adelanto North 2035 Sustainable Plan states the following Policy, “Use development impact fees to fund library facilities, equipment, and programs that are needed as a result of new development projects.” These fees are not currently enforced by the City; however, the Project will contribute to the City’s General Fund through revenues generated by the Project, which may be used in support of Library services, and which are considered sufficient to offset any impacts to other public facilities as a result of implementing the Project. Therefore, impacts are expected to be less than significant. 558
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
66 3.16 RECREATION

16. RECREATION.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Would the project increase the use of existing
neighborhood and regional parks or other
recreational facilities such that substantial physical
deterioration of the facility would occur or be
accelerated?
(b) Does the project include recreational facilities or require the construction or expansion of recreational
facilities which might have an adverse physical effect
on the environment?

3.16.1 Impact Analysis
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? No Impact. The Project involves creation of a new warehouse and, therefore, use of the site would be substantially similar to adjacent uses of the facilities to the north and south of the site. As previously mentioned, additional jobs generated by the Project are expected to be filled by residents who currently live in the area; and jobs would not result in the relocation of any population. Thus, the Project would not increase the use of the existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facilities would be accelerated. No impact would occur.
b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? No Impact. The Project is a warehouse project and does not involve construction or expansion of recreational facilities; no impact would occur.

3.17 TRANSPORTATION

17. TRANSPORTATION.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Conflict with a program, plan, ordinance or policy
addressing the circulation system, including transit,
roadways, bicycle and pedestrian facilities?
(b) Conflict or be inconsistent with CEQA Guidelines
section 15064.3, subdivision (b)?
(c) Substantially increase hazards due to a geometric
design feature (e. g., sharp curves or dangerous
intersections) or incompatible uses (e.g., farm
equipment)?
(d) Result in inadequate emergency access?
559
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
67 3.17.1 Environmental Setting
A VMT Analysis was prepared for the Project by General Technologies and Solutions (GTS). This memo is provided as Appendix D. The Project VMT analysis was conducted using the City of Adelanto’s “Traffic Impact Analysis Guidelines for Vehicle Miles Traveled (VMT) and Level of Service Assessment (LOS)” (Guidelines), dated July 2020. The guidelines included project screening criteria which was reviewed for the Project evaluation. The Project doesn’t qualify for VMT screening under any of the established screening criteria. A full VMT analysis was conducted using San Bernardino County Transportation Analysis Model (SBTAM), as recommended in the City’s guidelines.

SBTAM model is a socioeconomic data-based model and so the Project land use was converted into model employment categories using conversion factors that were developed from the ITE Trip Generation Manual trip rate data. The land use conversion yielded a total of 17 employees, however, the operational statement for the Project included a total of 20 employees at the Project site. Number of employees from the operational statement was used in the VMT analysis for a conservative scenario.

3.17.2 Impact Analysis
a) Would the project conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadways, bicycle and pedestrian facilities? Less than Significant Impact. The proposed Project is located off of Adelanto Road between of Rancho Road and Holly Road. According to the Adelanto North 2035 Sustainable Plan, Adelanto Road is intended to be a Major Boulevard (4 lanes, pedestrian oriented with Class II bike lanes). Traffic along this roadway is minimal at present, as this corridor consists mostly of vacant lots from Highway 395 between Holly Road and Rancho Road, but experiences higher levels of traffic from events at Adelanto Plaza and Event Center.

It is anticipated that the volume of traffic generated by the proposed Project will average at 101 trips per day. This is inclusive of 13 A.M. trips per day and 14 P.M. trips per day. Deliveries and truck trips related to operations of the proposed Project are anticipated to have a potential to occur on a weekday basis, with an estimated average of 15 round trips per day. Based on the planned capacities of the adjacent roadways, and that the Project will contribute a minimal amount of traffic to the surrounding roadways, the proposed Project has a less than significant potential to conflict with a program, plan, ordinance or policy addressing the roadway circulation system.

The Adelanto North 2035 Sustainable Plan states that “the [Victor Valley Transit Authority] VVTA’s Comprehensive Transit Plan proposes the following service improvements and addresses general changes that can benefit the entire VVTA network.” At present, no bus service is provided in the immediate vicinity of the Project site; however, the nearest route (Route 33) stops about 5,000 feet southeast of the Project site at Cactuc Road and Caliente Road/Highway 395. As stated above, Adelanto Road is planned to eventually accommodate a Class II Bikeway (bike lane) and eventually will include sidewalks to accommodate pedestrians, but at present, the roadway adjacent to the Project site is not paved, and it is unknown when in the future the planned infrastructure will be installed in this area. Given the lack of available alternative modes of transportation in the Project area, the proposed Project has a less than significant potential to conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities.
560
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
68 In addition, during construction of the Project, activities would be restricted to the Project site and would not interfere with roadway traffic. All construction equipment would be stored on site and would also not block the roadway. Therefore, the Project would not conflict with adopted policies, plans, or programs regarding public transit, bikeways, or pedestrian facilities and would not otherwise substantially reduce the performance or safety features of such facilities. b) Would the project Conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)? Less than Significant Impact. Both baseline (2016) and horizon year (2040) model runs were used to estimate Project’s VMT impacts. SBTAM socioeconomic databases for the scenarios were updated with the project land use to calculate Project VMT. Typically, Project VMT is calculated by isolating the project in a new TAZ or multiple TAZs depending on the diversity of project land uses and project size.

Since, SBTAM does not allow addition of new TAZs, one TAZ was borrowed for this Project. The Project TAZ was utilized to calculate Project specific VMT per service population.

The Project and Roadway VMT analysis for both 2016 and 2040 at both the Project and County levels, is provided in Table 3.17-1.

Table 3.17-1. VMT Analysis Results
Year Project County
Project Level Analysis
2016 16.9 26.4
2040 14.1 27.5
Roadway Level Analysis
2016 19.6 19.6
2040 23.6 23.7
As shown in Table 3.17-1, for both 2016 and 2040 conditions, the Project’s VMT per service population is less the County’s per service population. Based off the VMT results, the Project would not constitute a significant impact for both Project generated VMT and the Project’s effects on VMT. Therefore, a less than significant impact would occur.
c) Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g. farm equipment)? Less than Significant Impact. The Project consists of a new warehouse facility with parking, landscaping, and other associated improvements. The Project does not include any hazardous design features such as sharp curves or dangerous intersections and is compatible with surrounding uses, which are mainly industrial. Impacts would be less than significant. d) Would the project result in inadequate emergency access? Less than Significant Impact. The proposed Project consists of activities that would take place along Adelanto Road. Vehicles traveling to and from the Project site would utilize Highway 395 to access the site via Adelanto Road. The City of Adelanto does not identify any evacuation routes within the City, though Highway 395 is the logical north-south regional connecting roadway within the City. 561
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
69 Additionally, to ensure adequate circulation during operation, the proposed onsite parking and circulation plans will be reviewed by the local Fire Department and Police Department to ensure that the Project’s ingress/egress are adequate for accommodating emergency vehicles. Finally, a construction traffic plan will be required to be submitted to the Fire Department prior to development in order to provide adequate emergency access during construction of the proposed Project. As such, the proposed Project would not result in inadequate emergency access and impacts would be less than significant.

3.18 TRIBAL CULTURAL RESOURCES

18. TRIBAL CULTURAL RESOURCES.

Would the project cause a substantial adverse
change in the significance of a tribal cultural
resource, defined in Public Resources Code section
21074 as either a site, feature, place, cultural
landscape that is geographically defined in terms
of the size and scope of the landscape, sacred
place, or object with cultural value to a California
Native American tribe, and that is:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of
historical resources as defined in Public Resources
Code section 5020.1(k), or
(b) A resource determined by the lead agency, in its
discretion and supported by substantial evidence, to
be significant pursuant to criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1. In applying the criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1, the lead agency shall consider the
significance of the resource to a California Native
American tribe.

3.18.1 Environmental Setting
On April 1, 2022, Chambers Group requested that the Native American Heritage Commission (NAHC) conduct a search of its Sacred Lands File (SLF) to determine if Tribal Cultural Resources (TCR) important to Native Americans have been recorded in the Project site and 0.5-mile study area. PRC Section 21074 defines a resource as a TCR if it meets either of the following criteria:

1. sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a tribe that are listed, or determined to be eligible for listing, in the national or state register of historical resources, or listed in a local register of historic resources; or

2. a resource that the lead agency determines, in its discretion, is a tribal cultural resource On May 13, 2022, Chambers Group received a response from the NAHC stating that the search of its Sacred Lands File was negative for the presence of Native American cultural resources within Project site and the record search study area.

The Project site is located within the City of Adelanto, which has been contacted pursuant to Public Resources Code Section 21080.3.1 by the following California Native American tribes traditionally and 562
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
70 cultural affiliated with the City of Adelanto: Torres Martinez Desert Cahuilla Indians, San Manuel Band of Mission Indians, and Twenty-Nine Palms Band of Mission Indians.

The proposed Project does not require AB 52 or SB 18 consultation. Nonetheless, as a good faith effort, the City of Adelanto initiated tribal consultation for the Project on July 13, 2022, reaching out to the Native American tribes, which included six tribal groups, to discuss their knowledge of the Project area.

Only two tribes have responded: the Agua Caliente Band of Cahuilla Indians (ACBCI) and the Yuhaaviatam of San Manuel Nation (YSMN).

3.18.2 Impact Analysis
a) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)?
Less Than Significant Impact. As previously mentioned, as of the date of this document, only two tribes have responded to the City’s outreach. The ACBCI responded via e-mail on July 14, 2022, stating that the Project site is outside their Tribal Traditional Use Area, and deferring to more local tribal groups. The YSMN (formerly known as the San Manuel Band of Mission Indians) responded via e-mail on August 11, 2022 and again on August 25, 2022, noting that the Proposed Project area exists within Serrano ancestral territory and, therefore, is of interest to YSMN. The YSMN stated that YSMN does not have any concerns with the Project’s implementation, as planned, at this time; however, they did request that additional language be provided as part of the Project. These recommendations have been included as best management practices (BMPs) to ensure that any inadvertent discoveries of cultural resources are addressed, assessed, and protected appropriately, as well as verifying that the Tribe is notified appropriately of any cultural resources discovered throughout the Project. These practices (previously mentioned OS-13 and OS-14 in Section 3.5 and 3.7, respectively), and BMP-TCR1 and BMP-TCR-2 are intended to ensure that any inadvertent discoveries of TCRs are addressed, assessed, and protected appropriately, as well as verifying that the Tribe is notified appropriately of any cultural resources discovered throughout the Project.

As previously stated, the Project site consists of a trailer, concrete pads, storage boxes, and fence, with scattered native vegetation covering the site. During earth moving activities, implementation of the following BMPs shall be included as part of the construction process.

BMP-TCR-1: The YSMN Cultural Resources Department shall be contacted, as detailed in CUL-1, of any pre-contact cultural resources discovered during Project implementation, and be provided information regarding the nature of the find, so as to provide Tribal input with regards to significance and treatment. Should the find be deemed significant, as defined by CEQA (as amended, 2015), a cultural resource Monitoring and Treatment Plan shall be created by the archaeologist, in coordination with YSMN, and all subsequent finds shall be subject to this Plan. This Plan shall allow for a monitor to be present that represents YSMN for the remainder of the Project, should YSMN elect to place a monitor on-site.
563
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
71 BMP-TCR-2: Any and all archaeological/cultural documents created as a part of the Project (isolate records, site records, survey reports, testing reports, etc.) shall be supplied to the applicant and Lead Agency for dissemination to YSMN. The Lead Agency and/or applicant shall, in good faith, consult with YSMN throughout the life of the Project.

Therefore, the Project would not create a substantial adverse change to the significance of a tribal resources with compliance with the City’s policies and BMPs. Impacts would be less than significant. b) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Less Than Significant Impact. The Project is subject to compliance with the City’s Policy Implementation Program in addition to onsite BMPs. A good faith effort was conducted by the City to communicate with the California Native American Tribal representatives with regard to the Project.

No TCRs were identified during the outreach, and the City has not identified any TCRs within the Project site. Furthermore, results from the field survey and records search indicated that no previously recorded historic cultural resources have been documented within the proposed Project site. Impacts therefore are less than significant with regard to resources of significance to a California Native American tribe. To address any unanticipated tribal cultural resources that may be discovered on the Project site during ground disturbing activities associated with Project construction, compliance with the City’s Policy Implementation Program in addition to onsite BMP-TCR-1, BMP-TCR-2 would ensure impacts to be less than significant to undiscovered resources.

3.19 UTILITIES AND SERVICE SYSTEMS

19. UTILITIES/SERVICE SYSTEMS.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or
storm water drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
(b) Have sufficient water supplies available to serve the project and reasonably foreseeable future
development during normal, dry and multiple dry
years?
(c) Result in a determination by the wastewater
treatment provider which serves or may serve the
project that it has adequate capacity to serve the
project’s projected demand in addition to the
provider’s existing commitments?
564
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
72 19. UTILITIES/SERVICE SYSTEMS.

Would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(d) Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
(e) Comply with federal, state, and local management
and reduction statutes and regulations related to
solid wastes?

3.19.1 Impact Analysis
a) Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or expansion of which could cause significant environmental effects? Less Than Significant Impact. Impacts on utilities and service systems would be less than significant as further described below.

Water
Potable water required by the Project would be supplied by the City. The City of Adelanto’s AWD is responsible for the water supply for the City. The City’s water supply comes solely from groundwater production from 15 potable wells. The City projected water supplies and demand in the 2020 Urban Water Management Plan (UWMP) and noted adequate supply through the year 2045 (City 2021).

Construction activities associated with the Project are not expected to require a large amount of water due to the small amount of paving and water from the fire hydrant would be utilized as needed. The Project would connect to existing pipelines located along Adelanto Road. The installation of this pipeline underground would not cause any significant environmental effects and, as discussed under Threshold b below, the water system will not require expansion of existing water facilities beyond the construction of the conveyance pipeline to the proposed Project. Therefore, development of the Proposed Project would not result in a significant environmental effect related to the relocation or construction of new or expanded water facilities.

Wastewater
The City operates an upgraded 4.0 million gallons per day (MGD) activated sludge wastewater treatment facility through an operations and maintenance contract with PERC Water Corporation. All wastewater generated by the Project, once developed, will be delivered to AWD. The AWD Wastewater Treatment Plant treats approximately 1.5 MGD of wastewater at present, which leaves approximately 2.5 MGD of capacity remaining (City 2022).Based on the wastewater generation rates calculated under Threshold c below, the Project would represent a nominal increase in available capacity. The Project would connect to existing facilities along Adelanto Road. Therefore, development of the Project would not result in a significant environmental effect related to the relocation or construction of new or expanded wastewater facilities.

Stormwater
565
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
73 Stormwater would flow to catch basins which would be installed in the parking lot area. The drainage would be designed to capture the incremental increase in runoff from the Project site associated with Project development. This system will be designed to intercept the peak 100-year flow rate from the Project site. The downstream drainage system will not be altered and given the control of future surface runoff from the Project site; therefore, surface water will be adequately managed on site and as such, development of the Project would not result in a significant environmental effect related to the relocation or construction of new or expanded stormwater facilities. A full discussion of potential impacts to Hydrology and Water quality is provided under Section 3.10 of this document.

Electric Power
Electric power would be provided by SoCal Edison with nearby power delivery lines along Adelanto Road. Therefore, development of the warehouse facility would not result in a significant environmental effect related to the relocation or construction of new or expanded electrical power facilities.

Natural Gas
Natural gas will be supplied by Southwest Gas Company. The site will connect to the existing natural gas line along Adelanto Road. This effort to connect the site to natural gas is not anticipated to result in significant impacts, as evidenced by the discussions in preceding sections. Therefore, development of the warehouse facility would not result in a significant environmental effect related to the relocation or construction of new or expanded natural gas facilities.

Telecommunications
Development of the warehouse facility would require installation of telecommunication services, including wireless internet service and phone service. This can be accomplished through connection to existing services that are available to the developer at the Project site. Therefore, development of the facility would not result in a significant environmental effect related to the relocation or construction of new or expanded telecommunications facilities. b) Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal dry and multiple dry years? Less Than Significant Impact. The City of Adelanto’s AWD is responsible for the water supply for the City. The City’s water supply comes solely from groundwater production from 15 potable wells. The City’s water system delivers water to three pressure zones and consists of the aforementioned wells, transmission and distribution pipelines, booster stations and reservoirs. As mentioned in Threshold c below, the Project is expected to generate approximately 4,755 gallons of wastewater per day.

Typically, water demand is 125 percent of wastewater generation, which would mean that water demand would be expected to be around 5,944 gallons per day or 6.7 acre feet per year (AFY). The Urban Water Management Plan (UWMP) prepared for the City, notes that by 2025, the City would demand a total of 4,996 AFY of water (City 2021). The proposed Project would represent 0.13 percent of the City’s projected water demand by 2025, which is a nominal amount. Furthermore, the 2020 UWMP indicates that AWD’s planned water supply meets demand from 2020-2040 (City 2021).

Through the payment of water standby charges, hookup and connection fees, the impact of implementing the proposed Project on water systems would be less than significant. 566
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
74 c) Would the Project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Less Than Significant Impact. The AWD Wastewater Treatment Plant has a capacity of 4.0 MGD. The AWD Wastewater Treatment Plant treats approximately 1.5 MGD of wastewater at present, which leaves approximately 2.5 MGD of capacity remaining (City 2022). According to the San Bernardino Countywide Plan EIR, light industrial uses would generate approximately 1,500 gallons per acre per day (Countywide 2019). Based on this information, the Project would be expected to generate approximately 4,755 gallons per day or 0.0005 MGD which represents about 0.019 percent of the total remaining capacity at the Wastewater Treatment Plant. This would be considered a nominal amount. Thus, the proposed Project will consume some capacity of the existing AWD Wastewater Treatment Plant, but not a significant amount such that it would result in a determination by the wastewater treatment provider which serves or may serve the Project that it has adequate capacity to serve the Project's projected demand in addition to the provider's existing commitments. Impacts would be less than significant.
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less Than Significant Impact. The proposed Project will generate demand for solid waste service system capacity and has a potential to contribute to potentially significant cumulative demand impacts on the solid waste system. Solid waste generation rates shown on CalRecycle are segregated by sector, and state that warehouse uses such as that which this Project proposes can produce 13.82 pounds per employee per day (lbs/employee/day) (CalRecycle 2019). According to the applicant provided data, approximately 20 employees would be onsite during operations, which would equate to approximately 276.4 pounds of solid waste per day, 0.13 tons per day, or 50.44 tons of solid waste per year. The Victorville Sanitary Landfill has adequate capacity to handle the waste generated associated with construction and operations of the proposed Project. According to the CalRecycle, the maximum permitted capacity of Victorville Sanitary Landfill is 93,400,000 Cubic Yards (CY), while its remaining capacity is 79,400,000 CY; the Victorville Sanitary Landfill can accept 3,000 tons per day (CalRecycle 2022). The proposed Project would represent 0.13 tons per day of the allowed 3,000 tons per day, which is a nominal increase.

The City of Adelanto contracts with Burrtec Waste and Recycling Services to provide commercial trash services. It is not anticipated that the Project will generate a significant amount of construction waste, as the Project site has minimal existing materials on site. Additionally, the Project would require 1,190 cubic yards of cut and 4,850 cubic yards of fill, resulting in an import total of 3,660 cubic yards so no soil would be required to be removed from the site. Therefore, impacts would be less than significant. e) Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less Than Significant Impact. The Project consists of creation of a new warehouse and associated utilities; therefore, no major demolition is anticipated for the Project. Project operations would receive raw materials, resulting in minimal waste. Additionally, the Project would be required to comply with AB 939 and AB 341, which state the City must divert at least 50 percent of its annual 567
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
75 waste and set a 75-percent recycling goal for California by 2020. Compliance with these measures would ensure that impacts would remain less than significant.

3.20 WILDFIRE

20. WILDFIRE.

If located in or near state responsibility areas or
lands classified as very high fire hazard severity
zones, would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Substantially impair an adopted emergency response
plan or emergency evacuation plan?
(b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to, pollutant concentrations from a
wildfire or the uncontrolled spread of a wildfire?
(c) Require the installation or maintenance of
associated infrastructure (such as roads, fuel breaks,
emergency water sources, power lines or other
utilities) that may exacerbate fire risk or that may
result in temporary or ongoing impacts to the
environment?
(d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?

3.20.1 Impact Analysis
a) Would the project impair an adopted emergency response plan or emergency evacuation plan? b) Would the project, due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
c) Would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? d) Would the project expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability or drainage changes? No Impact. According to the CAL FIRE, there are no fire hazard zones within the City of Adelanto that are of state responsibility; furthermore, there are no very high fire hazard zones of local responsibility (CalFire 2022). The Project area is located within an area with very little fuel load in the surrounding area that could be susceptible to wildfires and is located within an area removed from the high fire hazard areas that are located adjacent to the San Bernardino Mountains to the south. The Project area is located within an area in a low-lying flat area of the City with very little fuel load and minimal chance for flooding or landslides, and is located within an area removed from the high fire hazard areas that are located adjacent to the San Bernardino Mountains to the south. 568
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
76 Additionally, as previously discussed, the City of Adelanto does not identify any evacuation routes within the City, though Highway 395 is the logical north-south regional connecting roadway within the City. No road closures would be required as part of construction of the Project. To ensure adequate circulation during operation, the proposed onsite parking and circulation plans will be reviewed by the local Fire Department and Police Department to ensure that the Project’s ingress/egress are adequate for accommodating emergency vehicles.

Since there are no state or local responsibility areas for very high fire hazard zones on or near the Project site, no impacts would occur.

3.21 MANDATORY FINDINGS OF SIGNIFICANCE

21. MANDATORY FINDINGS OF SIGNIFICANCE.

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
(a) Does the project have the potential to substantially degrade the quality of the environment,
substantially reduce the habitat of a fish or wildlife
species, cause a fish or wildlife population to drop
below self-sustaining levels, threaten to eliminate a
plant or animal community, substantially reduce the
number or restrict the range of a rare or endangered
plant or animal or eliminate important examples of
the major periods of California history or prehistory?
(b) Does the project have impacts that are individually limited, but cumulatively considerable?
(“Cumulatively considerable” means that the
incremental effects of a project are considerable
when viewed in connection with the effects of past
projects, the effects of other current projects, and
the effects of probable future projects?)
(c) Does the project have environmental effects which
will cause substantial adverse effects on human
beings, either directly or indirectly?

3.21.1 Impact Analysis
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less Than Significant Impact. As described in Section 3.4 Biological Resources and Section 3.5 Cultural Resources, impacts to both biological resources and cultural resources would remain less than significant with adherence to regulatory compliance measures. Implementation of the proposed Project would not substantially degrade the quality of the environment, substantially reduce the habitat of fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, or reduce the number or restrict the range 569
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
77 of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory. Therefore, impacts would be less than significant. b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects?)
Less Than Significant Impact. The potential for cumulative impacts occurs when the independent impacts of the Project are combined with the impact of related projects in proximity to the Project such that impacts occur that are greater than the impacts of the Project alone. As discussed above, it has been determined that the Project would have no impact, or impacts would be less than significant.

Since these impacts associated with the proposed Project would not be significant when compared to applicable thresholds, none of the impacts associated with the proposed Project would make cumulatively considerable, incremental contributions to significant cumulative impacts. Impacts would be less than significant.
c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Less than Significant Impact. Effects to human beings are generally associated with air quality, noise, traffic safety, geology/soils, and hazards/hazardous materials. As discussed in the previous environmental topic areas, the Project would not result in significant impacts to human beings because the Proposed Project would not cause significant impacts to air quality, noise, hazards, and traffic that would impact humans in the area. The impacts to human beings as a result of the Project would be less than significant.
570
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
78 SECTION 4.0– REFERENCES
The following is a list of references used in the preparation of this document.

California Department of Forestry and Fire Protection (CalFire) 2022 Fire Hazard Severity Zone Maps. Available online at:
https://osfm.fire.ca.gov/divisions/community-wildfire-preparedness-and-mitigation/wil dland-hazards-building-codes/fire-hazard-severity-zones-maps/.

California Department of Resources Recycling and Recovery (CalRecycle) 2019 Estimated Solid Waste Generation Rates. Accessed April 12, 2022. Available online at:
https://www2.calrecycle.ca.gov/WasteCharacterization/General/Rates 2022 SWIS Facility Details. Accessed April 12, 2022. Available online at:
https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/1870?siteID=2652 California Department of Fish and Wildlife (CDFW)
2022a California Natural Diversity Database (CNDDB). RareFind Version 3.1.0. Database Query for the Adelanto, Shadow Mountains, Victorville NW, Helendale, Shadow Mountains SE, Victorville, Phelan, Baldy Mesa, and Hesperia, California USGS 7.5-minute quadrangles.

Wildlife and Habitat Data Analysis Branch.
2022b Conservation Planning Data and Tools. Available online at:
https://wildlife.ca.gov/Conservation/Planning/Data-and-Tools California Department of Transportation (Caltrans)
2022 State Scenic Highway System Map. Accessed April 11, 2022. Available online at:
https://caltrans.maps.arcgis.com/apps/webappviewer/index.html?id=465dfd3d807c46c c8e8057116f1aacaa
California Department of Conservation (DOC)
2022 Important Farmland Finder. Accessed April 12, 2022. Available online at:
https://maps.conservation.ca.gov/DLRP/CIFF/
California Geologic Energy Management Division (CalGEM) 2022 Well Finder. Accessed July 2022. Available online at:
https://maps.conservation.ca.gov/doggr/wellfinder/#/-117.39955/34.54997/16 California Native Plant Society (CNPS)
2022 Inventory of Rare and Endangered Plants (online edition). Rare Plant Scientific Advisory Committee, California Native Plant Society, Sacramento, California. Accessed May 2022 from http://www.cnps.org/inventory for the Adelanto, Shadow Mountains, Victorville NW, Helendale, Shadow Mountains SE, Victorville, Phelan, Baldy Mesa, and Hesperia, California USGS 7.5-minute quadrangles.

CalRecycle
2019 Estimated Solid Waste Generation Rates. Accessed April 12, 2022. Available online at:
https://www2.calrecycle.ca.gov/WasteCharacterization/General/Rates 571
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
79 2022 SWIS Facility Details. Accessed April 12, 2022. Available online at:
https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/1870?siteID=2652 City of Adelanto (City)
2014 Adelanto North Sustainable Plan 2035. Available online at:
https://www.ci.adelanto.ca.us/DocumentCenter/View/623/Adelanto-North-2035- Sustainable-Plan
2019 Land Use and Zoning Map. Accessed April 11, 2022. Available online at:
https://www.ci.adelanto.ca.us/DocumentCenter/View/1135/ZONING-MAP-102419 2020 Local Hazard Mitigation Plan. Adopted May 2020. Available online at:
https://www.ci.adelanto.ca.us/DocumentCenter/View/1373/LHMP--2020. 2021 2020 Urban Water Management Plan (UWMP). Adopted August 25, 2021. Available online at: https://www.ci.adelanto.ca.us/DocumentCenter/View/1781/Adelanto-2020- UWMP
2022 Water & Sewer. Accessed August 17, 2022. Available online at:
https://www.ci.adelanto.ca.us/214/Water-Sewer.

Dibblee, T.W., and Minch, J.A.
2008 Geologic map of the Shadow Mountains and Victorville 15 minute quadrangles, San Bernardino and Los Angeles Counties, California. Dibblee Geological Foundation. Dibblee Foundation Map DF-387. Scale 1:62,500. Available at:
https://ngmdb.usgs.gov/Prodesc/proddesc_84197.htm
Department of Toxic Substances Control (DTSC)
2022 Envirostor Database. Accessed August 3, 2022. Accessed online at:
https://www.envirostor.dtsc.ca.gov/public/
Federal Emergency Management Agency (FEMA)
2022 Flood Insurance Rate Map (FIRM) Panel 06071C5795H. Effective August 28, 2008.

Available online at:
https://msc.fema.gov/portal/search?AddressQuery=adelanto#searchresultsanchor.

Federal Transit Authority (FTA)
2006 Transit Noise and Vibration Impact Assessment. Accessed May 31, 2022 at:
https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/FTA_Noise_and_Vibration_Ma nual.pdf
Google
2022 Google Earth Pro. Accessed April 11, 2022. Available online at:
https://earth.google.com/web/
Jennings, C.W., et al.
2010 Geologic Map of California, prepared for California Geological Survey, Map No. 2. 572
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
80 Mojave Desert Air Quality Management District (MDAQMD) 2020 California Environmental Quality Act (CEQA) and Federal Conformity Guidelines, February 2020. Available online at:
https://www.mdaqmd.ca.gov/home/showpublisheddocument/8510/637406182097070 000
Reynolds, R. E., and Springer, K.
1991 Paleontologic Mitigation Program Kramer-Victor 115 kV Transmission Line, Mojave Desert, California. By San Bernardino County Museum, for Southern California Edison Company. Bureau of Land Management Permit CA 881416.

San Bernadino Countywide Plan
2019 Draft Programmatic Environmental Impact Report, Utilities and Service Systems.

Available online at: https://countywideplan.com/wpcontent/uploads/sites/68/2021/01/Ch_05-18-USS.pdf.

Sawyer, J.O., T. Keeler-Wolf, and J.M. Evens
2009 A Manual of California Vegetation Second Edition. California Native Plant Society, Sacramento, California.

Southern California Association of Governments (SCAG)
2019 Adelanto Local Profiles Report. Accessed April 11, 2022. Available online at:
https://scag.ca.gov/sites/main/files/file-attachments/adelanto_localprofile.pdf?160601 4867
State Water Resources Control Board (SWRCB)
2022 Geotracker Database. Accessed August 3, 2022. Accessed online at:
https://geotracker.waterboards.ca.gov/
Sustainable Groundwater Management Act (SGMA)
2020 Sustainable Groundwater Management Act 2019 Basin Prioritization Process and Results adopted May 2020. Available online at: file://10.0.10.3/Projects/21300%20- 21399/21354%20-
%2016454%20Adelanto%20Road%20Warehouse/Reports/Initial%20Study/References/S GMA%202019.pdf.

United States Department of Agriculture (USDA)
2022 Soil Survey Staff, Natural Resources Conservation Service, United States Department of Agriculture. Official Soil Series Descriptions Accessed May 2022 from https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx United States Fish and Wilfdlife Service (USFWS)
2022 Threatened & Endangered Species Active Critical Habitat Report. Accessed online at:
https://www.arcgis.com/home/webmap/viewer.html?url=https://services.arcgis.com/Q VENGdaPbd4LUkLV/ArcGIS/rest/services/USFWS_Critical_Habitat/FeatureServer&sourc e=sd
573
16454 Adelanto Road Warehouse IS
Adelanto, California
Chambers Group, Inc.
21354
81 Air Quality, Energy, and Greenhouse Gas Emissions Impact Analysis for 16454 Adelanto Road Warehouse Distribution Facility Project prepared by Vista Environmental, August 17, 2022. Revised October 28,2022.

APPENDIX B Biological Resources Reconnaissance Assessment for the 16454 Adelanto Road Warehouse Distribution Facility Project prepared by Chambers Group, June 6, 2022.

APPENDIX C Cultural Resources Study Letter Report for the 16454 Adelanto Road Warehouse Distribution Facility, prepared by Chambers Group, August 25, 2022. Updated October 27, 2022.

APPENDIX D Vehicle Miles Traveled (VMT) Analysis – 16454 Adelanto Road Warehouse, prepared by General Technologies and Solutions (GTS), May 16, 2022; Updated October 27, 2022. 574
APPENDIX A – Air Quality, Energy, and Greenhouse Gas Emissions Impact Analysis for 16454 Adelanto Road Warehouse Distribution Facility Project prepared by Vista Environmental, August 17, 2022. Revised October 28,2022. 575

AIR QUALITY, ENERGY, AND GREENHOUSE GAS

EMISSIONS IMPACT ANALYSIS
16454 ADELANTO ROAD WAREHOUSE

DISTRIBUTION FACILITY PROJECT

CITY OF ADELANTO
Lead Agency:

City of Adelanto
11600 Air Expressway
Adelanto, CA 92301
Prepared by:

Vista Environmental
1021 Didrickson Way
Laguna Beach, CA
92651 949 510 5355
Greg Tonkovich, AICP
Project No. 22017
August 17, 2022
Rev. October 28, 2022
576
16454 Adelanto Road Warehouse Project, Air Quality, Energy, and GHG Emissions Impact Analysis City of Adelanto
Page i

TABLE OF CONTENTS

1.0 Introduction ............................................................................................................................ 1

1.1 Purpose of Analysis and Study Objectives................................................................................. 1

1.2 Site Locations and Study Area.................................................................................................... 1

1.3 Proposed Project Description .................................................................................................... 1

1.4 Executive Summary.................................................................................................................... 2

1.5 Project Design Features Incorporated into the Proposed Project............................................. 3

1.6 Mitigation Measures for the Proposed Project ......................................................................... 3

2.0 Air Pollutants........................................................................................................................... 7

2.1 Criteria Pollutants and Ozone Precursors.................................................................................. 7

2.2 Other Pollutants of Concern ...................................................................................................... 9

3.0 Greenhouse Gases................................................................................................................. 11

3.1 Greenhouse Gases................................................................................................................... 11

3.2 Global Warming Potential........................................................................................................ 13

3.3 Greenhouse Gas Emissions Inventory...................................................................................... 14

4.0 Air Quality Management ....................................................................................................... 15

4.1 Federal – United States Environmental Protection Agency..................................................... 15

4.2 State – California Air Resources Board .................................................................................... 17

4.3 Regional – Mojave Desert Air Basin......................................................................................... 18

5.0 Energy Conservation Management........................................................................................ 21

5.1 State ......................................................................................................................................... 21

5.2 Local – City of Adelanto ........................................................................................................... 24

6.0 Global Climate Change Management..................................................................................... 26

6.1 International ............................................................................................................................ 26

6.2 Federal – United States Environmental Protection Agency..................................................... 26

6.3 State ......................................................................................................................................... 27

6.4 Regional – Mojave Desert Air Quality Management District................................................... 32

7.0 Atmospheric Setting .............................................................................................................. 33

7.1 Regional Climate ...................................................................................................................... 33

7.2 Local Climate............................................................................................................................ 33

7.3 Monitored Local Air Quality..................................................................................................... 34

8.0 Modeling Parameters and Assumptions................................................................................. 37

8.1 CalEEMod Model Input Parameters ........................................................................................ 37

8.2 Energy Use Calculations........................................................................................................... 40

9.0 Thresholds of Significance...................................................................................................... 44

9.1 MDAQMD Air Quality and GHG Emissions Significance Thresholds........................................ 44 577
16454 Adelanto Road Warehouse Project, Air Quality, Energy, and GHG Emissions Impact Analysis City of Adelanto
Page ii

TABLE OF CONTENTS CONTINUED

9.2 Odor Impacts............................................................................................................................ 45

9.3 Energy Conservation................................................................................................................ 45

10.0 Impact Analysis ..................................................................................................................... 46

10.1 CEQA Thresholds of Significance ........................................................................................... 46

10.2 Air Quality Compliance .......................................................................................................... 46

10.3 Cumulative Net Increase in Non‐Attainment Pollution ......................................................... 47

10.4 Sensitive Receptors................................................................................................................ 49

10.5 Odor Emissions ...................................................................................................................... 50

10.6 Energy Consumption.............................................................................................................. 51

10.7 Energy Plan Consistency ........................................................................................................ 55

10.8 Generation of Greenhouse Gas Emissions............................................................................. 57

10.9 Greenhouse Gas Plan Consistency......................................................................................... 58

11.0 References............................................................................................................................. 60

APPENDICES
Appendix A – CalEEMod Model Printouts
Appendix B – EMFAC2017 Model Printouts
578
16454 Adelanto Road Warehouse Project, Air Quality, Energy, and GHG Emissions Impact Analysis City of Adelanto
Page iii

LIST OF FIGURES
Figure 1 – Project Local Study Area .............................................................................................................. 5 Figure 2 – Proposed Site Plan ....................................................................................................................... 6

LIST OF TABLES
Table A – Global Warming Potentials, Atmospheric Lifetimes and Abundances of GHGs......................... 13 Table B – State and Federal Criteria Pollutant Standards........................................................................... 15 Table C – Mojave Desert Air Basin Attainment Status................................................................................ 16 Table D – MDAQMD Attainment Plans....................................................................................................... 18 Table E – Monthly Climate Data ................................................................................................................. 34 Table F – Local Area Air Quality Monitoring Summary............................................................................... 35 Table G – CalEEMod Land Use Parameters................................................................................................. 37 Table H – Inventory of Vehicle Trips During Full Operation of Proposed Project ...................................... 39 Table I – Fleet Mix During Full Operation of Proposed Project .................................................................. 39 Table J – Off‐Road Equipment and Fuel Consumption from Construction of the Proposed Project ......... 41 Table K – On‐Road Vehicle Trips and Fuel Consumption from Construction of the Proposed Project...... 42 Table L – MDAQMD Significant Emissions Thresholds ............................................................................... 44 Table M – Construction‐Related Air Pollutant Emissions........................................................................... 47 Table N – Operations‐Related Air Pollutant Emissions............................................................................... 48 Table O – Proposed Project Compliance with Applicable General Plan Energy Policies............................ 55 Table P – Project Related Greenhouse Gas Annual Emissions ................................................................... 58 579
16454 Adelanto Road Warehouse Project, Air Quality, Energy, and GHG Emissions Impact Analysis City of Adelanto
Page iv

ACRONYMS AND ABBREVIATIONS
AB   Assembly Bill
AQMP   Air Quality Management Plan
BACT   Best Available Control Technology
BSFC   Brake Specific Fuel Consumption
CAAQS   California Ambient Air Quality Standards
CalEEMod California Emissions Estimator Model
CalEPA   California Environmental Protection Agency
CAPCOA California Air Pollution Control Officers Association CARB   California Air Resources Board
CEC   California Energy Commission
CEQA   California Environmental Quality Act
CFCs   chlorofluorocarbons
Cf4   tetrafluoromethane
C2F6   hexafluoroethane
CH4   Methane
City   City of Adelanto
CO   Carbon monoxide
CO2   Carbon dioxide
CO2e   Carbon dioxide equivalent
DPM   Diesel particulate matter
EPA   Environmental Protection Agency
ºF   Fahrenheit
FTIP   Federal Transportation Improvement Program
GHG   Greenhouse gas
GWP   Global warming potential
HAP   Hazardous Air Pollutants
HFCs   Hydrofluorocarbons
IPCC   International Panel on Climate Change
kWhr   kilowatt‐hour
LCFS   Low Carbon Fuel Standard
LST   Localized Significant Thresholds
580
16454 Adelanto Road Warehouse Project, Air Quality, Energy, and GHG Emissions Impact Analysis City of Adelanto
Page v
MATES   Multiple Air Toxics Exposure Study
MDAB   Mojave Desert Air Basin
MDAQMD Mojave Desert Air Quality Management District
MMTCO2e Million metric tons of carbon dioxide equivalent MPO   Metropolitan Planning Organization
MWh   Megawatt‐hour
NAAQS   National Ambient Air Quality Standards
NOx   Nitrogen oxides
NO2   Nitrogen dioxide
OPR   Office of Planning and Research
Pfc   Perfluorocarbons
PM   Particle matter
PM10   Particles that are less than 10 micrometers in diameter PM2.5   Particles that are less than 2.5 micrometers in diameter PPM   Parts per million
PPB   Parts per billion
PPT   Parts per trillion
RTIP   Regional Transportation Improvement Plan
RTP/SCS Regional Transportation Plan/Sustainable Communities Strategy SB   Senate Bill
SBCOG   San Bernardino Council of Governments
SCAQMD South Coast Air Quality Management District
SCAG   Southern California Association of Governments
SF6   Sulfur Hexafluoride
SIP   State Implementation Plan
SOx   Sulfur oxides
TAC   Toxic air contaminants
UNFCCC United Nations’ Framework Convention on Climate Change VOC   Volatile organic compounds
581

16454 Adelanto Road Warehouse Project, Air Quality, Energy, and GHG Emissions Impact Analysis City of Adelanto

Page 1 ends