AGENDA
REGULAR MEETING
OF THE ADELANTO CITY COUNCIL,
ADELANTO PUBLIC FINANCING AUTHORITY,
ADELANTO PUBLIC UTILITY AUTHORITY,
ADELANTO COMMUNITY BENEFIT CORPORATION,
AND THE SUCCESSOR AGENCY BOARD
JANUARY 28, 2026
City Council
Gabriel Reyes, Mayor
Daniel Ramos, Mayor Pro Tem
Stevevonna Evans, Councilor
Angelo Meza, Councilor
Amanda Uptergrove, Councilor
City Manager
Jessie Flores
City Attorney
Todd Litfin
Meetings held:
2 nd & 4th Wednesday
Adelanto Stadium
Conference Room
12000 Stadium Way,
Adelanto CA, 92301
Open Session: 11:00 a.m.
NOTE: PLEASE TURN CELL PHONES OFF OR PLACE THEM ON VIBRATE DURING THE CITY COUNCIL MEETING AS A COURTESY TO OTHERS. Thank you, Administrative Staff The City Council Agenda packet may be reviewed by the public at the reception counter in City Hall. Any writings or documents pertaining to an open session item, provided to a majority of the City Council within 72 hours of a regular meeting, shall be made available for public inspection at the reception counter in City Hall at 11600 Air Expressway, Adelanto, CA 92301, during normal business hours. Members of the public can view the agenda or download any staff reports in advance by accessing the City website at www.ci.adelanto.ca.us on Thursday the week before the scheduled meeting.
The public may view the meeting or participate / comment remotely as follows:
• All of our meetings are streamed live at https://watch.adelantoca.gov and are also available for playback after the meeting.
• Participate via zoom please log in using any of the options below:
• Teleconference: https://meet.adelantoca.gov
Or Telephone:
1-669-900-6833
Webinar ID: 931 4644 4676
Passcode: 7601
Submit written comments:
We encourage submittal of written comments supporting, opposing, or otherwise commenting on an agenda item, for distribution to the City Council prior to the meeting. Send emails to [email protected]; written correspondence may be sent to Brenda Lopez, 11600 Air Expressway Adelanto CA 92301.
1 REGULAR MEETING
JANUARY 28, 2026
11600 Air Expressway • Adelanto, CA 92301 • (760) 246-2300 • www.ci.adelanto.ca.us Rules of Decorum
“Members of the Public are advised that all PAGERS, CELLULAR TELEPHONES and any OTHER COMMUNICATION DEVICES are to be turned off upon entering the City Council Chambers.” If you need to have a discussion with someone in the audience, kindly step out into the lobby. Under the Government Code, the City Council may regulate disruptive behavior that impedes the City Council Meeting.
Disruptive conduct may include, but is not limited to:
• Screaming or yelling during another audience member’s public comments period; • Profane language directed at individuals in the meeting room; • Throwing objects at other individuals in the meeting room; • Physical or verbal altercations with other individuals in the meeting room; and • Going beyond the allotted three-minute public comment period granted.
When a person’s or group’s conduct disrupts the meeting, the Mayor or presiding officer will request that the person or group stop the disruptive behavior, and WARN the person or group that they will be asked to leave the meeting room if the behavior continues.
If the person or group refuses to stop the disruptive behavior, the Mayor or presiding officer may order the person or group to leave the meeting room, and may request that those persons be escorted from the meeting room. Any person who, without authority of law, willfully disturbs or breaks up a City Council meeting is guilty of a misdemeanor. (Pen. Code, § 403.) It should also be noted that any person who WILLFULLY disturbs or breaks up the City Council meeting may be arrested for a misdemeanor offense. (Penal Code, § 403.)
MEMBERS OF THE PUBLIC WISHING TO ADDRESS THE CITY COUNCIL MEMBERS
ARE REQUIRED TO FILL OUT A SPEAKER REQUEST FORM AND PLACE IT IN THE TRAY ON THE PODIUM PRIOR TO MEETING. Thank you, Administrative Staff The City Council packet may be reviewed by the public at the reception counter in City Hall. Any writings or documents pertaining to an open session item, provided to a majority of the City Council Members within seventy-two (72) hours of a Regular Meeting and twenty-four (24) hours of a Special Meeting. Members of the public can view the agenda or download any staff reports in advance by accessing the City’s website at www.ci.adelanto.ca.us on the Thursday of the week before the scheduled meeting.
AMERICANS WITH DISABILITIES ACT: In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Clerk at (760) 246-2300, ext. 11123, no later than seventy-two (72) hours prior to the meeting per 28 CFR
34.102.104.
2 REGULAR MEETING
JANUARY 28, 2026
11600 Air Expressway • Adelanto, CA 92301 • (760) 246-2300 • www.ci.adelanto.ca.us TIME: _____________
ROLL CALL: Councilor Evans ________
Councilor Meza ________
Councilor Uptergrove ________
Mayor Pro Tem Ramos ________
Mayor Reyes ________
INVOCATION:
FLAG SALUTE: ______________________
1. City Manager to announce if there is any addition/removal of items from the agenda.
C. APPROVAL OF AGENDA
M__________________S__________________ACTION___________ D. CITY MANAGERS ANNOUNCEMENTS AND REPORT
E. CITY COUNCIL ANNOUNCEMENTS AND REPORTS
A. CALL TO ORDER—REGULAR MEETING
B. DELETIONS/ADDITIONS TO AGENDA
3 REGULAR MEETING
JANUARY 28, 2026
11600 Air Expressway • Adelanto, CA 92301 • (760) 246-2300 • www.ci.adelanto.ca.us F. PRESENTATIONS
1. Certificate of Recognition Walmart Store #4392.
G. PUBLIC COMMUNICATIONS
PUBLIC COMMENT: OPEN: CLOSED:
This is the time and place for members of the public to comment on any matter within the jurisdiction of the City Council. Members of the public wishing to address the City Council Members on items not on the agenda can push *9 on their telephones to raise their hands. The City Clerk will call on you in the order received. You will be asked to un-mute - to do so you must push *6. Please state your name for the record. There is a time limit of three (3) minutes.
Members of the audience may address the City Council on non-agenda items; however, in accordance with Government Code section 54954.2, the City Council may not act on an item not appearing on the agenda
H. CONSENT CALENDAR
Items on the Consent Calendar are considered routine in nature and non-controversial and require no further discussion by the City Council. They may be acted on in one motion unless a member of the City Council requests a separate discussion on an item.
MOTION APPROVING THE CONSENT CALENDAR AS PRESENTED
1. Waiver of Full Reading of Ordinances. Proposed action to waive full reading (except title) of all ordinances appearing on this City Council agenda as authorized by Government Code Section 36934, unless otherwise directed by the City Council.
2. Receive and File the Commercial and Residential Recycling Department Report.
3. Receive and File the Commercial and Residential Recycling Department 4th Quarter Report.
4. Receive and File Cannabis Compliance Report.
5. Approval of Resolution 26-02 authorizing the City Manager to apply for the Prohousing Incentive Program Funds.
RESOLUTION NO. 26-02
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ADELANTO
AUTHORIZING APPLICATION FOR, AND RECEIPT OF, PROHOUSING INCENTIVE PROGRAM FUNDS.
4 REGULAR MEETING
JANUARY 28, 2026
11600 Air Expressway • Adelanto, CA 92301 • (760) 246-2300 • www.ci.adelanto.ca.us
6. Receive and File the City’s Single Audit Report for the fiscal year ended June 30, 2023.
7. Acceptance of Parcel Map 20498 – Subdivide 21.86 acres into 19 lots northeast corner of Aster Road and Violet.
8. Approval of Warrant Demand Schedule 25/26-07-02
a. City of Adelanto Check Warrant No. 151629 through 151644 in total amount of $47,019.70
b. City of Adelanto EFT No. 4225 through 4229 and 4815 through 4889 in total amount of $2,757,235.33.
M__________________ S__________________ ACTION_______________ I. ADELANTO PUBLIC UTILITY AUTHORITY CONSENT CALENDAR
MOTION APPROVING THE CONSENT CALENDAR AS PRESENTED
1. Waiver of Full Reading of Ordinances. Proposed action to waive full reading (except title) of all ordinances appearing on this APUA agenda as authorized by Government Code Section 36934, unless otherwise directed by the City Council.
2. Approval of Sewer Department Report.
3. Approval of Water Department Report.
M__________________ S__________________ ACTION_______________ J. PUBLIC HEARING
OPEN PUBLIC HEARING: CLOSE PUBLIC HEARING:
1. CONSIDERATION OF A RESOLUTION APPROVING THE CITY’S COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM FOR FISCAL YEAR 2025-26. (VIRGINIA) RECOMMENDATION: It is recommended that the City Council: (1) open the public hearing and take public testimony; and (2) adopt Resolution No. 26-01 authorizing the City’s CDBG Program for Fiscal Year 2026-27.
5 REGULAR MEETING
JANUARY 28, 2026
11600 Air Expressway • Adelanto, CA 92301 • (760) 246-2300 • www.ci.adelanto.ca.us RESOLUTION NO. 26-01
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ADELANTO, COUNTY OF SAN BERNARDINO, CALIFORNIA, APPROVING THE CITY’S COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM FOR FISCAL YEAR 2026-27 M__________________S__________________ACTION_________________ K. NEW BUSINESS
OPEN: CLOSED
1. REJECTION OF ALL BIDS FOR THE SENECA ROAD REHABILITATION PROJECT (GARY) RECOMMENDATION: Staff recommends that the City Council reject all bids received for the Seneca Road Rehabilitation Project pursuant to the City’s bid documents and the California Public Contract Code, direct staff to revise the plans and specifications and re-bid the project.
M__________________S__________________ACTION_________________ L. ITEMS REMOVED FROM THE CONSENT CALENDAR
M. FUTURE AGENDA ITEMS
City Councilmembers may request to receive a report, schedule a study session, or to place an item on a future City Council agenda regarding matters within the jurisdiction of the City Council. Requests require a motion, a second, and a majority vote of the City Council. Individual requests should be voted on separately. The City Manager shall work with City staff to respond to inquiries and requests as soon as practicable in an appropriate manner. 6 REGULAR MEETING
JANUARY 28, 2026
11600 Air Expressway • Adelanto, CA 92301 • (760) 246-2300 • www.ci.adelanto.ca.us N. ADJOURNMENT
The next Regular Meeting of the City Council will be held on February 11, 2026, at 11:00 a.m. at Adelanto Stadium 12000 Stadium Way, Adelanto CA, 92301.
TIME OUT: ______________
M__________________S__________________ACTION____________________
I, BRENDA LOPEZ, CITY CLERK OF THE CITY OF ADELANTO, OR MY DESIGNEE,
HEREBY CERTIFY THAT A TRUE, ACCURATE COPY OF THE FOREGOING AGENDA WAS POSTED ON JANUARY 22, 2026, SEVENTY-TWO (72) HOURS PRIOR TO THE MEETING PER GOVERNMENT CODE 54954.2 IN THE GOVERNMENTAL CENTER’S DISPLAY CASE, 11600 AIR EXPRESSWAY, IN ADELANTO, CALIFORNIA.
Brenda Lopez, City Clerk, CMC
O. DECLARATION OF POSTING
7 REGULAR MEETING
JANUARY 28, 2026
11600 Air Expressway • Adelanto, CA 92301 • (760) 246-2300 • www.ci.adelanto.ca.us
YOUR CITY GOVERNMENT
CHARTER CITY: Ratified by the electors of the City at an election on November 3, 1992. “A Charter City can do what the Charter permits it to do, so long as there is not direct violation of the State Constitution.”
CITY COUNCIL: The City Council is the legislative and policy-making body of the City. The City Council is composed of one elected Mayor and four Council Members, elected at large (to represent the entire City), to serve four (4) year, staggered terms.
CITY MANAGER: The City Manager is the chief executive officer responsible for the day-to-day administration of City affairs.
CITY COUNCIL MEETING: The regular meeting of your City Council is a vital part of the democratic process in the conduct of the City’s affairs. These meetings are open to the public and conducted by your elected representatives who are responsible, as a body, for the operation of Adelanto’s City government. The City Council appreciates your interest and urges citizen participation in government matters.
LEGISLATIVE TERMS
ORDINANCES: Ordinances are the means by which the City enacts its local laws. Unless an urgent situation exists, ordinances will first be presented at a City Council meeting as a “first reading.” At a subsequent City Council meeting, there will be a “second reading” and vote for or against adoption. Ordinances go into effect after a waiting period of thirty (30) days, in most cases, during which time the summary of the ordinance is published in a local newspaper approved for this purpose.
RESOLUTIONS: Resolutions and minute orders are the means by which the City Council formally adopts policies and/or approves specific actions. These go into effect upon adoption 8 Adelanto City Hall ~ 11600 Air Expressway, Adelanto, CA 92301 ~ (760) 246-2300 ~ Fax (442) 249-1121
REGULAR MEETING
OF THE ADELANTO CITY COUNCIL
ADELANTO PUBLIC FINANCING AUTHORITY,
ADELANTO PUBLIC UTILITY AUTHORITY,
ADELANTO COMMUNITY BENEFIT CORPORATION,
AND THE SUCCESSOR AGENCY BOARD
JANUARY 28, 2026
All of our meetings are streamed live at https://watch.adelantoca.gov and are also available for playback after the meeting.
Participate via zoom please log in using any of the options below:
Teleconference https://meet.adelantoca.gov
TIME TELECONFERENCE
Location:
Conference Room
12000 Stadium Way
Adelanto CA , 92301 To Participate and and Call in for public comments:
Please call 1-669-900-6833 along with
conference code 931 4644 4676 Passcode: 7601
Open Session – 11:00 a.m.
Dated: January 22, 2026 Brenda Lopez, City Clerk, CMC
9 CITY COUNCIL AGENDA REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: January 28, 2026
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
BY: Brenda Lopez, City Clerk
SUBJECT: MONTHLY COMMERCIAL & RESIDENTIAL SOLID WASTE AND
RECYCLING REPORT
STAFF RECOMMENDATION:
Receive and file.
ATTACHMENTS:
1. Burrtec’s Monthly Commercial and residential Solid Waste and Recycling Report 10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
CITY COUNCIL AGENDA REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: January 28, 2026
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
BY: Brenda Lopez, City Clerk
SUBJECT: 4
th QUARTER COMMERCIAL & RESIDENTIAL SOLID WASTE AND
RECYCLING REPORT
STAFF RECOMMENDATION:
Receive and file.
ATTACHMENTS:
1. Burrtec’s Monthly 4th Quarter Commercial and residential Solid Waste and Recycling Report 32 33
Bulky Item, Universal Waste, and E-Waste Collection
Universal waste includes such items as toaster ovens and radios. Electronic waste, or e-waste, includes such items as computer monitors, television sets, stereos, and CPUs. Barrel-serviced customers can schedule a convenient curbside collection of E-waste and large unwanted items by contacting our customer service department. A list of all completed bulky item pick-ups is included.
Quarterly program activity is reflected in the table below:
Used Oil E-Waste Sharps
Oil Container Deliveries 0 Televisions 105 New Containers Distribution 0 Used Oil Collection 0 Other Items 101 Used Containers Collection 0 Program activity from September through November is reflected in the table below:
Bulky Item Pick-ups
Calls Received 829
Diverted Bulky tons 10.76
Street Sweeping Services
A total of 95.00 tons of street sweeping debris were collected and taken to Victor Valley Compost during the reporting period.
Contamination Notices and Monitoring Activities
During the quarter, we issued 52 notices. In addition, the summary of the route review results is attached.
Problems Encountered
No problems were encountered during the quarter.
Recycling Outreach Activities
Below, please find the activity summary for the Commercial and Multi-Family Recycling Program.
Date Remarks
10/18/2025 Clean-Up Event; Trash 45.68 Tons, Metal 5.54 Tons, Green waste 2.09 Tons, Tires 4.62 Tons, 2 Compost Loads 18.85 tons
10/23/2025 Commercial Fall Newsletter
12/08/2025 Residential Winter Newsletter
Commercial and Multi-Family Recycling Program
Attached is MCR, MORe, and SB1383 Compliance data for the quarter.
Container Detail
Attached is a breakdown of container types and capacities for December 2025. 34 35
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
56 57
58 59
60 61
62 63
64 65
66 67
68 69
70 71
72 73
74 75
76 77
78 79
80 81
82 83
84 CITY COUNCIL AGENDA REPORT
DATE: January 28, 2025
TO: Honorable Mayor and City Council Member
FROM: Jessie Flores, City Manager
BY: Cannabis Compliance Department
SUBJECT: REPORT ON CANNABIS COMPLIANCE AND COLLECTION ACTIVITIES FOR DECEMBER 2025
STAFF RECOMMENDATION:
Its is recommended that City Council receive and file the report of activities associated with Cannabis Compliance for December 2025
BACKGROUND:
See attached.
FISCAL IMPACT:
In November - December the Cannabis department collected $409,340.03 in total revenue, $89,220.03 more than same time last year. Year to date collections are $390,947.75 behind same time last year. YTD collections have exceeded the full year budget.
ATTACHMENTS:
- Department report.
85 DECEMBER 2025
REVENUE REPORT
CITY OF ADELANTO
CANNABIS COMPLIANCE DEPARTME NT
J A N U A R Y 2 1 S T , 2 0 2 6
Photo credit: Compass Real Estate
86 D E C E M B E R 2 0 2 5 2
CANNABIS COMPLIANCE DEPART MENT
The City of Adelanto's Cannabis Compliance Department is responsible for overseeing and regulating the thriving cannabis industry within the city. This department plays a crucial role in ensuring the industry operates within the bounds of local regulations, promoting public safety and responsible business practices.
Oversight of the department is provided by the Finance Manager & Planning Administrator and tasks are executed by the HObsequio LLC team.
Photo credit: Reuters
87 D E C E M B E R 2 0 2 5 3
Table 1 Data provided by the City of Adelanto Cannabis Compliance Department 2024/2025 Monthly Revenue by Category
Month Type of Fund Cannabis Funds Collected Change 2024 2025 January
Permit $59,181.00 $25,380.00 ($33,801.00)
Tax $853,828.03 $705,085.36 ($148,742.67)
Total $913,009.03 $730,465.36 ($182,543.67)
February
Permit $64,413.00 $107,772.00 $43,359.00
Tax $121,908.93 $264,894.76 $142,985.83
Total $186,321.93 $372,666.76 $186,344.83
March
Permit $138,656.97 $85,796.00 ($52,860.97)
Tax $0.00 $114,198.00 $114,198.00
Total $138,656.97 $199,994.00 $61,337.03
April
Permit $147,687.00 $82,791.00 ($64,896.00)
Tax $799,251.18 $724,073.23 ($75,177.95)
Total $946,938.18 $806,864.23 ($140,073.95)
May
Permit $75,011.00 $284,650.00 $209,639.00
Tax $189,659.88 $251,959.39 $62,299.51
Total $264,670.88 $536,609.39 $271,938.51
June
Permit $94,066.00 $165,076.00 $71,010.00
Tax $1,006,527.93 $54,080.22 ($952,447.71)
Total $1,100,593.93 $219,156.22 ($881,437.71)
July
Permit $106,125.00 $61,674.00 ($44,451.00)
Tax $810,908.50 $1,011,773.05 $200,864.55
Total $917,033.50 $1,073,447.05 $156,413.55
August
Permit $338,421.00 $253,359.00 ($85,062.00)
Tax $260,032.43 $242,265.34 ($17,767.09)
Total $598,453.43 $495,624.34 ($102,829.09)
September
Permit $69,896.20 $50,074.00 ($19,822.20)
Tax $5,543.00 $89,852.00 $84,309.00
Total $75,439.20 $139,926.00 $64,486.80
October
Permit $141,103.90 $107,949.00 ($33,154.90)
Tax $784,222.68 $903,573.50 $119,350.82
Total $925,326.58 $1,011,522.50 $86,195.92
November
Permit $109,651.00 $122,776.00 $13,125.00
Tax $57,858.00 $262,759.03 $204,901.03
Total $167,509.00 $385,535.03 $218,026.03
December
Permit $68,324.00 $16,920.00 ($51,404.00)
Tax $84,287.00 $6,885.00 ($77,402.00)
Total $152,611.00 $23,805.00 ($128,806.00)
Yearly
Total:
Permit $1,412,536.07 $1,364,217.00 ($48,319.07)
Tax $4,974,027.56 $4,631,398.88 ($342,628.88)
Total $6,386,563.63 $5,995,615.88 ($390,947.75)
88 D E C E M B E R 2 0 2 5 4
Data provided by the City of Adelanto Cannabis Compliance Department Data provided by the City of Adelanto Cannabis Compliance Department Cannabis Funds Collected by Month
Figure 1
Rounded to nearest $
Figure 2
Rounded to nearest $
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
Cannabis Funds Collected by Month
2024 2025
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
$1,800,000
$2,000,000
Cannabis Funds Collected by Month
Permits 2024 Permits 2025 Taxes 2024 Taxes 2025
89 D E C E M B E R 2 0 2 5 5
CANNABIS FUNDS—
PERMITS VS TAXES
Cannabis funds vary by month, due to the
differences in frequency and allocation of either type
of fund. There are two ways the city collects cannabis
revenue: taxes and permits.
Due quarterly at the end of January, April, July, and
October, taxes form the bulk of the funds collected.
Taxes are broken down into two subsets, gross
receipts (percentage) and canopy space (square
footage used). Due to a large percentage of the
companies paying taxes based on their gross
receipts and the industry slowing down, there has
been a decrease in the amount of taxes brought in
this year as compared to the previous year.
Permits are collected for each company annually and
are spread throughout the year. Permits have been
historically obtained with the city for permits the
company did not strictly need, as it is easier to renew a permit than to obtain one. However, this year due
to a decrease in business, operators have been
surrendering their permits that have not been in use.
TAXES
Gross Receipts: Comprised of Retail,
Manufacturing, and Distribution, this is
the largest group. The taxes paid are 3%
of the quarterly income.
Canopy Space: Cultivation and Nurseries (a
subcategory of cultivation that handles
seeds and immature plants) make up this
category. The taxes paid are $1.25 per
square foot used for production.
PERMITS
There are several types of permits, the
Department of Cannabis Control lists the
following:
Manufacturing: Creation of cannabis
products
Retail: Sale of cannabis
Distribution: Transportation of cannabis
Cultivation: Growth of cannabis
Testing Laboratory: Testing of cannabis or
cannabis products
Photo credit: Pexels.com
90 D E C E M B E R 2 0 2 5 6
Data provided by the City of Adelanto Cannabis Compliance Department * Data collected by Calendar Year
Table 2
Rounded to nearest $
BUDGET REVENUE
The Cannabis Compliance Department has exceeded budget for the previous two years. The percentage of funds collected from permits for 2024 was 22% while the percentage of funds collected from taxes was 78% (rounded to the nearest percent). Similarly, the percentage of funds collected from permits for 2025 was 23% while the percentage of funds collected from taxes was 77% (rounded to the nearest percent). Revenue was reduced in 2025 for several reasons, primarily that there was a decrease in sales which impacted taxes and the surrender of permits rather than renewal. This led to a decline from the previous year, though still above budget. In the two-year period that this covers, the percentage of revenue generated from permits and taxes is 22.43% and 77.57%, respectively.
The Department also began collecting past due payments from the companies. The total collected in a six-month span was $185,693. Of that sum, 90.89% came from overdue taxes owed while 9.11% was from overdue permit fees. Overdue taxes and permit fees were discovered within the scope of the audits conducted and it is anticipated that over the next couple of years all overdue taxes will be paid or in the process of a payment plan with the City.
Budget 2024
$4,913,328
Budget 2025
$5,542,426
Above Budget FY
$1,473,236 Above Budget FY
$183,190
Permits
$1,412,536
Permits
$1,364,217
Taxes
$4,974,028 Taxes
$4,361,399
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
B U D G E T 2 0 2 4 A C T U A L 2 0 2 4 B U D G E T 2 0 2 5 A C T U A L 2 0 2 5
BUDGET REVENUE
Budget Above Budget FY Permits Taxes
91 D E C E M B E R 2 0 2 5 7
AUDITS ADMINISTERED
TOTAL AUDITS— 233
T hi s i s t he t o t al am o un t of a u di ts e st i ma te d f or th e A ud i t Y e ar s 2 0 2 2 , 2 0 2 3, and 2 0 2 4. T he e sti ma t ed amo u nt s a re i nc l u si ve of t ho se who h av e gai n e d the i r li c en se s w i thi n thi s t im e fr am e or be f ore t hi s pe r io d. T he e sti m at e e xc lud e s c omp an i e s th e ye ar a fte r t he i r l ic e n se wa s s ur r e nd e re d, l os t, or e xpi r e d.
Total Audits for 2022– 67
Total Audits for 2023– 77
Total Audits for 2024– 89
TOTAL COMPLETED— 35
T hi s i s t he t o t al s o f th e a udi t s whi c h th e C an n abi s C o m pli anc e D ep ar t me nt h as c lo se d /c o m pl et ed for the y e ar s 2 0 2 2, 2 0 23 , a nd 2 0 2 4. T hi s i nc l ud e s one a ud i t c lo sed i n 2 02 3 fo r t he tax ye ar 2 0 22 , al l o t he r au d it s we re co mpl et e d i n 2 0 25 .
Total Completed Audits for 2022– 9
Total Completed Audits for 2023– 13
Total Completed Audits for 2024– 13
TOTAL IN-PROGRESS— 198
T hi s i s t he t o t al am o un t of a u di ts e st i ma te d f or th e A ud i t Y e ar s 2 0 2 2 , 2 0 2 3, and 2 0 2 4. T he a mo unt s li st e d are t he tot al a ud i ts m i nu s tho se c o mpl e te d. T h e e st i m ate d am oun t s a re i n cl us i ve of t h os e w ho have g ain e d th ei r l i c e n se s wi th i n t h i s ti me fr a me or be f or e thi s p e ri o d. T he e sti m at e al s o e x cl ude s c omp ani e s the y e ar a ft er th e ir li c e n se wa s s ur re nde r e d, lo st , or ex pi r e d.
Total In-Progress Audits for 2022– 58
Total In-Progress Audits for 2023– 64
Total In-Progress Audits for 2024– 76
ANTICIPATED AUDITS FOR AUDIT YEAR 2025— 106
T hi s e sti m a te i s d er i v e d fro m t he gro wi n g li st of c o mp ani e s th at t he C ann abi s C o mpli anc e De pa r tm e nt as se s se s. Inc l u de d in t h is e sti mat i on i s th e ex c lu si o n o f c o m pa ni e s w hi ch hav e s urr e nde r e d, lo st , or had t he i r li ce n s e( s ) an d/o r p e rm it s e x p ir e wi t h in o r be for e the l a st y e ar . 92 D E C E M B E R 2 0 2 5 8
CONCLUSION
The Cannabis Compliance Department has collected a total of $12,382,179 over the past two years, with 78% deriving from tax collections and 22% from permits. Tax collection is performed on a quarterly basis with the payment due on the last day of January, April, July, and October. Permit fees are due upon renewal, which varies for each company.
The department, in conjunction with the Code Enforcement Department, conduct inspections to ensure compliance from the operators within the city. Violations that arise are typically swiftly corrected by operators within a 30-day period. The department may assess fines if prompt action to resolve any violations are not taken. Departmental contact between the California Department of Cannabis Control and the California Department of Tax and Fee Administration allows for smooth acquisitions of permits within the city for the operators and ensures that all operators are up to date on their state permits and taxes.
Photo credit: Business View Magazine
93 CITY COUNCIL AGENDA REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: January 28, 2026
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
SUBJECT: RESOLUTION 26-02 OF THE CITY COUNCIL OF THE CITY OF
ADELANTO AUTHORIZING THE CITY MANAGER TO APPLY FOR
PROHOUSING INCENTIVE PROGRAM FUNDS
STAFF RECOMMENDATION:
Staff recommends that the City Council adopt the attached resolution authorizing the City Manager to apply for the Prohousing Incentive Program Funds.
BACKGROUND:
The City received its official Pro-Housing Designation letter from the California Department of Housing and Community Development (HCD) on May 28, 2025, confirming the City’s eligibility under the State’s Pro-Housing Program.
On September 30, 2025, HCD released the Notice of Funding Availability (NOFA) for the fourth round of the Prohousing Incentive Program (PIP Round 4). To receive funding under this program, the City must submit a separate application.
A similar resolution was previously adopted on November 26, 2024, and this updated resolution reflects higher scoring criteria and increased eligible funding under the current round. This resolution authorizes the City to submit a Pro-Housing Incentive Program (PIP) application for up to six hundred twenty thousand dollars ($620,000) to support housing activities in Adelanto.
ANALYSIS:
The Prohousing Incentive Program (PIP), administered by the California Department of Housing and Community Development (HCD), rewards jurisdictions with pro-housing policies by providing funding and additional points in competitive applications for housing and infrastructure programs. These points enhance a city’s ability to secure financing for affordable housing initiatives.
The City has applied for approval as a pro-housing jurisdiction, qualifying it to apply for up to $620,000 in PIP funds. These funds will directly support initiatives that address the City’s housing needs by facilitating the development of affordable housing for extremely low to moderate-income households. The City’s housing needs analysis highlights the necessity of expanding affordable housing to meet demand.
By securing PIP funds, Adelanto will strengthen its capacity to finance and implement housing projects, 94 furthering its affordability goals.
The proposed resolution enables the City to submit its PIP application and utilize the funds for the following activities:
• Creating a revolving loan program for downpayment assistance ($35,000). • Lending funds to HHI of 120% and below median income ($585,000).
ENVIRONMENTAL IMPACT:
There are no anticipated environmental impacts associated with the submission of this application.
FISCAL IMPACT:
There is no fiscal impact resulting from the submission of this application.
ATTACHMENTS:
1. Resolution 26-02
2. Prohousing Incentive Program Application Package
95 Resolution for the Prohousing Incentive Program
RESOLUTION NO. 26-02
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ADELANTO AUTHORIZING APPLICATION FOR, AND RECEIPT OF, Prohousing Incentive Program funds.
WHEREAS, pursuant to Health and Safety Code 50470 et. Seq, the California Department of Housing and Community Development (Department) is authorized to issue Guidelines as part of an incentive program (hereinafter referred to by the Department as the Prohousing Incentive Program or “PIP”); and WHEREAS THE CITY COUNCIL OF THE CITY OF ADELANTO desires to submit a PIP grant application package (“Application”), on the forms provided by the Department, for approval of grant funding for eligible activities toward planning and implementation activities related to housing and community development as a result of meeting eligibility criteria including but not limited to Prohousing Designation; and
WHEREAS, the Department has issued Guidelines and Application on September 30, 2025 in the amount of $8 Million for PIP;
Now, therefore, the City Council of City of Adelanto (“Applicant”) resolves as follows:
SECTION 1. The City Manager is hereby authorized and directed to submit an Application to the Department in response to the NOFA, and to apply for the PIP grant funds in a total amount not to exceed $ 620,000;
SECTION 2. In connection with the PIP grant, if the Application is approved by the Department, the City Manager of the City of Adelanto is authorized and directed to enter into, execute, and deliver on behalf of the Applicant, a State of California Agreement (Standard Agreement) for the amount of $620,000, and any and all other documents required or deemed necessary or appropriate to evidence and secure the PIP grant, the Applicant’s obligations related thereto, and all amendments thereto; and
SECTION 3. The Applicant shall be subject to the terms and conditions as specified in the Guidelines, and the Standard Agreement provided by the Department after approval. The Application and any and all accompanying documents are incorporated in full as part of the Standard Agreement. Any and all activities funded, information provided, and timelines represented in the Application will be enforceable through the fully executed Standard Agreement.
Pursuant to the Guidelines and in conjunction with the terms of the Standard 96 Agreement, the Applicant hereby agrees to use the funds for eligible uses and allowable expenditures in the manner presented and specifically identified in the approved Application.
PASSED, APPROVED AND ADOPTED this 28th day of January 2026 ______________________________
Gabriel Reyes, Mayor
_______________________________
Brenda Lopez, City Clerk
97 Resolution No. 26-02
I, Brenda Lopez, City Clerk of the City of Adelanto, California, do hereby certify that the foregoing Resolution No. 26-02 was duly and regularly adopted at a regular meeting of the City Council of the City of Adelanto on this 28th day of January , 2026 be the following vote to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS THEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 28th day of January, 2026
______________________________
Brenda Lopez, City Clerk
98 Prohousing Incentive Program
(PIP)
2025 Application for Local Governments
State of California
Governor, Gavin Newsom
Tomiquia Moss, Secretary
Business, Consumer Services and Housing Agency
Gustavo Velasquez, Director
Department of Housing and Community Development
Megan Kirkeby, Deputy Director
Division of Housing Policy Development
Final Filing Date: March 31, 2026
651 Bannon Street, Suite 400 Sacramento, CA 95811
Website: https://www.hcd.ca.gov/grants-and-funding/programs-active/prohousingincentive-program Email: [email protected]
99 X
X
X
X
X
X
Demonstration of meeting threshold criteria shall be determined by the Department in its sole and absolute discretion. No documentation of meeting threshold requirements is required in the application unless requested by the Department.
Housing Element Annual Progress Report submittal pursuant to Government Code Section 65400 for the current or prior year, as applicable.
Prohousing Designation: An awarded or completed Prohousing Designation Application with an authorizing resolution must be submitted prior to or in conjunction with the Applicant’s PIP Application. PIP Awards cannot be made until a Prohousing Designation is awarded.
A complete application as determined by the Department.
An authorizing resolution authorizing submittal of the application to the Program that materially comports with the Program’s requirements and is legally sufficient as determined in the Department’s reasonable discretion, including an authorized representative. See Attachment B of the PIP Guidelines for required resolution format.
Compliance with state and federal housing laws as determined by the sole discretion of HCD.
Prohousing Incentive Program (PIP) Application Instructions The applicant is applying to the Department of Housing and Community Development (Department) for a grant authorized under the provisions pursuant to Health and Safety Code Section 50470(2)(C)(i). PIP is designed to encourage cities and counties to achieve Prohousing Designation. Please refer to the PIP Guidelines and September 2024 Notice of Funding Availability (NOFA) for detailed information on eligible uses and awards. If you have questions regarding this application or the PIP Program, email [email protected].
If approved for funding, the PIP application is incorporated as part of your Standard Agreement with the Department. To be considered for funding, all sections of this application, including attachments if required, must be complete and accurate.
In order to be considered for funding, all applicants must submit a complete, signed application to [email protected] by March 31, 2026. Pursuant to Section 202 of the PIP Guidelines, all applicants must meet the following threshold requirements to be eligible for funding:
An adopted housing element in substantial compliance, as determined by the Department, pursuant to Housing Element Law (Article 10.6 of Gov. Code) in accordance with Government Code section 65585, subdivision (h).
Threshold Requirements
100
Applicant
Applicant Agency Type
Mailing Address
City Zip Code
County
Website
TIN
Authorized Representative Name
Authorized Representative Title
Phone Fax
Email
Contact Person Name
Contact Person Title
Phone Fax
Email
Signature Date
Name Title
San Bernardino
https://adelantoca.gov/
Jessie Flores
1/28/2026
City Manager
As the official designated by the governing body (authorized representative above and in resolution), I hereby certify that, if approved by HCD for funding through PIP, the applicant assumes the responsibilities specified in the NOFA and certifies that the information, statements, and other contents contained in this application are true and correct.
Financial Manager
760-246-2300, Ext 11150
[email protected]
95-2673990
Applicant Information
City of Adelanto
City
11600 Air Expy
Adelanto 92301
Jessie Flores
City Manager
760-246-2300 ext 11184
[email protected]
Diana Gunn
101
Jurisdiction Name Eligible Base Award
Geographic Category Bonus Award Amount:
Prohousing Designation Application
Score 37 620,000 Total Award $
Award Amount
Adelanto $ 250,000
Southern California
Click the dropdown menu to choose a jurisdiction. The geographic category and base award will auto-populate. If the jurisdiction has obtained Prohousing Designation at the time of PIP application submittal, enter in the Prohousing Designation applicant score.
Population projections are based on the Department of Finance E-1 January 1, 2025 estimates. https://dof.ca.gov/Forecasting/Demographics/estimates-e1/ $ 370,000
102
X
X
Eligible Applicants must use award funds towards any planning or implementation activities related to housing and community development including, but not limited to, any eligible uses pursuant to Health and Safety Code section 50470(b)(2)(D), as described below. Please indicate which of the following the applicant will use award funds toward:
Eligible Uses
Objective
(v) Capitalized reserves for services connected to the creation of new permanent supportive housing, including, but not limited to, developments funded through the Veterans Housing and Homelessness Prevention Bond Act of 2014. (vi) Assisting persons who are experiencing or at risk of homelessness, including providing rapid rehousing, rental assistance, navigation centers, emergency shelters, and the new construction, rehabilitation, and preservation of permanent and transitional housing. (i) The predevelopment, development, acquisition, rehabilitation, and preservation of multifamily, residential live-work, rental housing that is affordable to extremely low, very low, low-, and moderate-income households, including necessary operating subsidies. (ii) Affordable rental and ownership housing that meets the needs of a growing workforce earning up to 120 percent of area median income, or 150 percent of area median income in high-cost areas. (iii) Matching portions of funds placed into local or regional housing trust funds. (vii) Accessibility modifications.
(viii) Efforts to acquire and rehabilitate foreclosed or vacant homes. (ix) Homeownership opportunities, including, but not limited to, downpayment assistance. (x) Fiscal incentives or matching funds to local agencies that approve new housing for extremely low, very low, low-, and moderate-income households. (iv) Matching portions of funds available through the Low and Moderate Income Housing Asset Fund pursuant to subdivision (d) of Section 34176 of the Health and Safety Code.
Responsible Party
Summary of Proposed Activities
Proposed Activity
End Eligible Use Category Notes
Subtask(s)
Est. Cost Begin Statement of Work Plan
Subtask: Program
Development
Subtask: Program
Rollout
City or Sub
City or Sub
Program
Development 5/1/2026
Revloving Loan
Fund 2/1/2029
35,000
585,000
Contract with eligible firm to create a program for a
Revolving Loan for downpayment assistance
Lend out the funds to HHI of 120% and below median
income.
Firm must have experience with local lenders
Firm must have experience with local lenders
2/1/2026
2/1/2026
103
CITY COUNCIL AGENDA REPORT
1 A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: January 28, 2026
TO: Honorable Mayor and City Council Members
FROM: Jesse Flores, City Manager
BY: Diana Gunn, Finance Manager
SUBJECT: RECEIVE AND FILE THE CITY’S SINGLE AUDIT AND
INDEPENDENT AUDITORS’ REPORT FOR THE FISCAL YEAR
ENDED JUNE 30, 2023 (FINAL REPORT)
STAFF RECOMMENDATION:
It is recommended that the City Council receive and file the City’s Single Audit Report for the fiscal year ended June 30, 2023.
BACKGROUND:
The audit of the City’s Single Audit and Independent Auditors’ Report for Fiscal Year 2022/2023 (FY22/23) has been completed by the independent auditor, The Pun Group, Accountants & Advisors.
The financial statements are intended to reflect the City’s compliance with grant requirements. A government agency is only required to have a single audit performed if there was federal grant funding used in excess of $750,000. The City does not meet this requirement every year, thus it is not an annual audit. In FY22/23, there was one major program with over $750,000 spent.
The major program was the County of San Bernardino’s (the “County”) CDBG – Entitlement Grants Cluster under CDFA listing number 14.218 with a total of $1,056,084. Of these funds $437,706 were used towards the Target Area Road Rehabilitation project and $336,105 were used for North Adelanto Road Rehabilitation Project. Another $250,000 was used for North Adelanto Infrastructure Improvement Projects which included White Avenue and Jonathan Street.
The City received an unmodified opinion, meaning the Schedule of Expenditures of Federal Awards (the “SEFA”) is fairly stated in all material respects in relation to the basic financial statements of the City.
FISCAL IMPACT:
There is no fiscal impact at this time.
ATTACHMENTS:
104
2 1. Fiscal Year 2022/2023 Single Audit and Independent Auditors’ Report (Final Report)
2. Fiscal Year 2022/2023 Schedule of Findings and Questioned Costs (Final Report) 105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
CITY COUNCIL AGENDA REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: January 28, 2025
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
BY: Gary Huang, Engineering Manager
SUBJECT: PARCEL MAP-20498
STAFF RECOMMENDATION:
1. Staff recommend that the City Council approve the recordation of Parcel Map 20498 as submitted.
2. Authorize the Mayor to sign the Acceptance Certificate on behalf of the City Council BACKGROUND:
This is an approval for Parcel Map 20498 to record. Planning Commission approved Tentative Parcel Map 20498 by resolution no. P-23-07 at the February 15, 2023 meeting to subdivide 21.86-acres into 19 lots and a public street (Apache Road) on a site located at the northwest corner of Aster Road and Violet Road in the Manufacturing/Industrial (MI) zone in the City of Adelanto, California (APN’s: 0459-441- 38).The City Engineer has found the Final Map to be in substantial compliance with the tentative map and the conditions of approval. All necessary corrections have been made.
Staff recommends City Council approval and signature by the Mayor for acceptance of Parcel Map 20498 to allow recordation by San Bernardino County Recorder’s Office.
FISCAL IMPACT:
None
ATTACHMENTS:
A. Parcel Map 20498
141
142
143
CITY COUNCIL AGENDA REPORT
STAFF RECOMMENDATION:
Staff recommends that City Council review and ratify Warrant Demand Schedule 25/26-07-02.
1. City of Adelanto Check Warrant No. 151629 through 151644 in the total amount of $47,019.70
2. City of Adelanto EFT No. 4225 through 4229, and No. 4815 through 4889 in the total amount of $2,757,235.33.
BACKGROUND:
All payments have been reviewed in accordance with policies for processing payments and expenditures.
FISCAL IMPACT:
Summary of Payments issued:
Total Number of Payments: 96
Total Amount of Payments: $2,804,255.03
ATTACHMENTS:
1. Payment Check Register – Check No. 151629 through 151644
2. Payment EFT Register – EFT No. 4225 through 4229, and 4815 though 4889 DATE:
January 28, 2026
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
BY: Finance Department
SUBJECT: WARRANT DEMAND SCHEDULE 25/26-07-02
144
Payment Register
City of Adelanto
From Payment Date: 1/22/2025 - To Payment Date: 1/21/2026 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
04000013-01 - CITY OF ADELANTO GENERAL CHKG
Check
151629 01/08/2026 Open Utility Management
Refund
ALCANTAR, JASMIN $314.94
151630 01/08/2026 Open Utility Management
Refund
BETANCOURT, MARCOS $227.53
151631 01/08/2026 Open Utility Management
Refund
CASTELLANOS or DARLIN
CASTELLANOS, ROBERT
$84.56
151632 01/08/2026 Open Utility Management
Refund
CHASE, VICTOR $278.90
151633 01/08/2026 Open Utility Management
Refund
INLAND ASSET MANAGEMENT LLC
C/O JEANNE BARBOSA
$243.18
151634 01/08/2026 Open Utility Management
Refund
KHA, TAI $183.66
151635 01/08/2026 Open Utility Management
Refund
LEE'S DONUTS INC. $34.18
151636 01/08/2026 Open Utility Management
Refund
TAPIA, CONSUELO OR RUBEN $21.05
Type Check Totals: 8 Transactions $1,388.00
04000013-01 - CITY OF ADELANTO GENERAL CHKG Totals
Checks Status Count Transaction Amount Reconciled Amount Open 8 $1,388.00 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 8 $1,388.00 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 8 $1,388.00 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 8 $1,388.00 $0.00
Flagstar AP - Accounts Payable
Check
151637 01/08/2026 Open Accounts Payable ANDY CANALES $4,875.00 151638 01/08/2026 Open Accounts Payable EDWARD S. RAYA $5,200.00 151639 01/08/2026 Open Accounts Payable HIGH DESERT COMMUNITY
FOUNDATION
$4,000.00
151640 01/08/2026 Open Accounts Payable SESSOMS, CHRISTOPHER $180.00 151641 01/14/2026 Open Accounts Payable JAMES C HIRSCH AICP, ASSOC AIA CORP
$29,050.00
151642 01/14/2026 Open Accounts Payable MARY MANZO $1,724.70 151643 01/14/2026 Open Accounts Payable RAMOS, DANIEL $301.00 user: Diana Gunn Pages: 1 of 2 Wednesday, January 21, 2026 145
Payment Register
City of Adelanto
From Payment Date: 1/22/2025 - To Payment Date: 1/21/2026 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
151644 01/14/2026 Open Accounts Payable UPTERGROVE, AMANDA $301.00 Type Check Totals: 8 Transactions $45,631.70
Flagstar AP - Accounts Payable Totals
Checks Status Count Transaction Amount Reconciled Amount Open 8 $45,631.70 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 8 $45,631.70 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 8 $45,631.70 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 8 $45,631.70 $0.00
Grand Totals:
Checks Status Count Transaction Amount Reconciled Amount Open 16 $47,019.70 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 16 $47,019.70 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 16 $47,019.70 $0.00
Reconciled 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 16 $47,019.70 $0.00
user: Diana Gunn Pages: 2 of 2 Wednesday, January 21, 2026 146
Payment Register
City of Adelanto
From Payment Date: 1/22/2025 - To Payment Date: 1/21/2026 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
04000013-01 - CITY OF ADELANTO GENERAL CHKG
EFT
4225 12/15/2025 Open Accounts Payable PITNEY BOWES, INC. $756.00 4226 01/05/2026 Open Accounts Payable CHASE PAYMENTECH $2,683.45 4227 01/05/2026 Open Accounts Payable CHASE PAYMENTECH $8,694.17 4228 01/05/2026 Open Accounts Payable CHASE PAYMENTECH $1,147.45 4229 01/13/2026 Open Accounts Payable SOUTHWEST GAS CORPORATION $1,736.07 Type EFT Totals: 5 Transactions $15,017.14
04000013-01 - CITY OF ADELANTO GENERAL CHKG Totals
EFTs Status Count Transaction Amount Reconciled Amount
Open 5 $15,017.14 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 5 $15,017.14 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 5 $15,017.14 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 5 $15,017.14 $0.00
Grand Totals:
EFTs Status Count Transaction Amount Reconciled Amount
Open 5 $15,017.14 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 5 $15,017.14 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 5 $15,017.14 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 5 $15,017.14 $0.00
user: Diana Gunn Pages: 1 of 1 Wednesday, January 21, 2026 147
Payment Register
City of Adelanto
From Payment Date: 1/22/2025 - To Payment Date: 1/21/2026 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Flagstar AP - Accounts Payable
EFT
4815 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $625.50 4816 01/08/2026 Reconciled 01/08/2026 Accounts Payable ADELANTO AUTO CARE & TIRES LLC
$199.73 $199.73 $0.00
4817 01/08/2026 Reconciled 01/08/2026 Accounts Payable ALTA PLANNING AND DESIGN $23,378.15 $23,378.15 $0.00 4818 01/08/2026 Reconciled 01/08/2026 Accounts Payable AMAZON CAPITAL SERVICES, INC. $53.86 $53.86 $0.00 4819 01/08/2026 Reconciled 01/08/2026 Accounts Payable AVCO DISPOSAL, INC. $3,101.82 $3,101.82 $0.00 4820 01/08/2026 Reconciled 01/08/2026 Accounts Payable BANK UP CORPORATION $750.00 $750.00 $0.00 4821 01/08/2026 Reconciled 01/08/2026 Accounts Payable BECK OIL INC $924.03 $924.03 $0.00 4822 01/08/2026 Reconciled 01/08/2026 Accounts Payable BRN LLC $6,250.00 $6,250.00 $0.00 4823 01/08/2026 Reconciled 01/08/2026 Accounts Payable BURKE, WILLIAMS & SORENSEN, LLP
$11,106.50 $11,106.50 $0.00
4824 01/08/2026 Reconciled 01/08/2026 Accounts Payable CAMERON-COLE LLC $310.00 $310.00 $0.00 4825 01/08/2026 Reconciled 01/08/2026 Accounts Payable CHARTER COMMUNICATIONS $6,622.69 $6,622.69 $0.00 4826 01/08/2026 Reconciled 01/08/2026 Accounts Payable DCSE INC. $2,880.00 $2,880.00 $0.00 4827 01/08/2026 Reconciled 01/08/2026 Accounts Payable DEWEY PEST CONTROL, INC. $487.00 $487.00 $0.00 4828 01/08/2026 Reconciled 01/08/2026 Accounts Payable EXECUTIVE ELEVATOR, INC. $766.00 $766.00 $0.00 4829 01/08/2026 Reconciled 01/08/2026 Accounts Payable FEDERAL EXPRESS $81.71 $81.71 $0.00 4830 01/08/2026 Reconciled 01/08/2026 Accounts Payable GEOCULUS INC. $6,000.00 $6,000.00 $0.00 4831 01/08/2026 Reconciled 01/08/2026 Accounts Payable GRANICUS $23,542.70 $23,542.70 $0.00 4832 01/08/2026 Reconciled 01/08/2026 Accounts Payable HOBSEQUIO LLC $17,500.00 $17,500.00 $0.00 4833 01/08/2026 Reconciled 01/08/2026 Accounts Payable HOME DEPOT CREDIT SERVICES $1,415.06 $1,415.06 $0.00 4834 01/08/2026 Reconciled 01/08/2026 Accounts Payable INFOSEND $4,299.95 $4,299.95 $0.00 4835 01/08/2026 Reconciled 01/08/2026 Accounts Payable LAN WAN ENTERPRISES INC $41,066.60 $41,066.60 $0.00 4836 01/08/2026 Reconciled 01/08/2026 Accounts Payable LOCAL EQUITY LLC $54,111.65 $54,111.65 $0.00 4837 01/08/2026 Reconciled 01/08/2026 Accounts Payable MANUFACTURING ALL DREAMS
STUDIOS, ARLEY ARSINEDA
$7,590.00 $7,590.00 $0.00
4838 01/08/2026 Reconciled 01/08/2026 Accounts Payable MOJAVE WATER AGENCY $30,780.00 $30,780.00 $0.00 4839 01/08/2026 Reconciled 01/08/2026 Accounts Payable PERC WATER CORPORATION $69,531.10 $69,531.10 $0.00 4840 01/08/2026 Reconciled 01/08/2026 Accounts Payable POLITICAL DYNAMICS, LLC $3,500.00 $3,500.00 $0.00 4841 01/08/2026 Reconciled 01/08/2026 Accounts Payable POTOMAC PARTNERS DC, LLC $7,500.00 $7,500.00 $0.00 4842 01/08/2026 Reconciled 01/08/2026 Accounts Payable RIGHT OF WAY, INC. $1,226.38 $1,226.38 $0.00 4843 01/08/2026 Reconciled 01/08/2026 Accounts Payable SAN BERNARDINO COUNTY
INNOVATION AND TECHNOLOGY
$177.87 $177.87 $0.00
4844 01/08/2026 Reconciled 01/08/2026 Accounts Payable SAN BERNARDINO COUNTY
SHERIFF-CORONER DEPARTMENT
$6,133.75 $6,133.75 $0.00
4845 01/08/2026 Reconciled 01/08/2026 Accounts Payable VULCAN $281.87 $281.87 $0.00 4846 01/08/2026 Reconciled 01/08/2026 Accounts Payable ZSE & ASSOCIATES $19,000.00 $19,000.00 $0.00 4847 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $78.44 4848 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $207.07 4849 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $1,383.87 4850 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $7,279.02 4851 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $3,485.60 4852 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $1,230.32 4853 01/06/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $309.78 4854 01/12/2026 Open Accounts Payable CARL WARREN & COMPANY LLC $14,076.25 4855 11/12/2025 Open Accounts Payable FIRST NATIONAL BANK OF OMAHA $22,749.80 4856 01/14/2026 Open Accounts Payable SOUTHERN CALIFORNIA EDISON $325.29 user: Diana Gunn Pages: 1 of 3 Wednesday, January 21, 2026 148
Payment Register
City of Adelanto
From Payment Date: 1/22/2025 - To Payment Date: 1/21/2026 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
4857 01/14/2026 Reconciled 01/14/2026 Accounts Payable ADELANTO AUTO CARE & TIRES LLC
$985.25 $985.25 $0.00
4858 01/14/2026 Reconciled 01/14/2026 Accounts Payable AMAZON CAPITAL SERVICES, INC. $341.06 $341.06 $0.00 4859 01/14/2026 Reconciled 01/14/2026 Accounts Payable AQUA METRIC SALES $300,341.50 $300,341.50 $0.00 4860 01/14/2026 Reconciled 01/14/2026 Accounts Payable AVCO DISPOSAL, INC. $3,463.44 $3,463.44 $0.00 4861 01/14/2026 Reconciled 01/14/2026 Accounts Payable BURKE, WILLIAMS & SORENSEN, LLP
$3,172.50 $3,172.50 $0.00
4862 01/14/2026 Reconciled 01/14/2026 Accounts Payable C. WELLS PIPELINE MATERIALS, INC
$2,629.10 $2,629.10 $0.00
4863 01/14/2026 Reconciled 01/14/2026 Accounts Payable CALIFORNIA TOOL & WELDING $197.15 $197.15 $0.00 4864 01/14/2026 Reconciled 01/14/2026 Accounts Payable CORELOGIC SOLUTIONS, LLC. $225.00 $225.00 $0.00 4865 01/14/2026 Reconciled 01/14/2026 Accounts Payable GARDA WORLD $1,011.07 $1,011.07 $0.00 4866 01/14/2026 Reconciled 01/14/2026 Accounts Payable GATEWAY PET CEMETERY INC. $350.00 $350.00 $0.00 4867 01/14/2026 Reconciled 01/14/2026 Accounts Payable HDL COMPANIES-HINDERLITER,
DE LLAMAS & ASSOCIATES
$450.00 $450.00 $0.00
4868 01/14/2026 Reconciled 01/14/2026 Accounts Payable HOME DEPOT CREDIT SERVICES $559.20 $559.20 $0.00 4869 01/14/2026 Reconciled 01/14/2026 Accounts Payable LAN WAN ENTERPRISES INC $1,923.90 $1,923.90 $0.00 4870 01/14/2026 Reconciled 01/14/2026 Accounts Payable LEAGUE OF CALIFORNIA CITIES $15,242.00 $15,242.00 $0.00 4871 01/14/2026 Reconciled 01/14/2026 Accounts Payable MAINSTREAM UNLIMITED LLC $200.00 $200.00 $0.00 4872 01/14/2026 Reconciled 01/14/2026 Accounts Payable MARIA DEL CARMEN ESQUIVEL $500.00 $500.00 $0.00 4873 01/14/2026 Reconciled 01/14/2026 Accounts Payable MOBILE OCCUPATIONAL SERVICES, INC.
$45.00 $45.00 $0.00
4874 01/14/2026 Reconciled 01/14/2026 Accounts Payable MOJAVE DESERT AQMD $432.72 $432.72 $0.00 4875 01/14/2026 Reconciled 01/14/2026 Accounts Payable ROADPOST USA INC. dba
BLUECOSMO
$77.25 $77.25 $0.00
4876 01/14/2026 Reconciled 01/14/2026 Accounts Payable ROGERS, ANDERSON, MALODY &
SCOTT LLP
$7,621.00 $7,621.00 $0.00
4877 01/14/2026 Reconciled 01/14/2026 Accounts Payable SAN BERNARDINO COUNTY FIRE
DEPARTMENT
$12,279.46 $12,279.46 $0.00
4878 01/14/2026 Reconciled 01/14/2026 Accounts Payable SAN BERNARDINO COUNTY FIRE
PROTECTION DISTRICT
$1,114,356.00 $1,114,356.00 $0.00
4879 01/14/2026 Reconciled 01/14/2026 Accounts Payable SAN BERNARDINO COUNTY
SHERIFF-CORONER DEPARTMENT
$696,968.00 $696,968.00 $0.00
4880 01/14/2026 Reconciled 01/14/2026 Accounts Payable SHRED-IT USA LLC $286.16 $286.16 $0.00 4881 01/14/2026 Reconciled 01/14/2026 Accounts Payable STAPLES ADVANTAGE $69.39 $69.39 $0.00 4882 01/14/2026 Reconciled 01/14/2026 Accounts Payable SWRCB ACCOUNTING OFFICE $50,275.68 $50,275.68 $0.00 4883 01/14/2026 Reconciled 01/14/2026 Accounts Payable THE PUN GROUP LLP $10,000.00 $10,000.00 $0.00 4884 01/14/2026 Reconciled 01/14/2026 Accounts Payable UNDERGROUND SERVICE ALERT $199.89 $199.89 $0.00 4885 01/14/2026 Reconciled 01/14/2026 Accounts Payable UNITED STATES CONFERENCE of MAYORS
$4,348.00 $4,348.00 $0.00
4886 01/14/2026 Reconciled 01/14/2026 Accounts Payable VCA MESA ANIMAL HOSPITAL $73.70 $73.70 $0.00 4887 01/14/2026 Reconciled 01/14/2026 Accounts Payable VERIZON WIRELESS $2,897.69 $2,897.69 $0.00 4888 01/14/2026 Reconciled 01/14/2026 Accounts Payable VULCAN $142.35 $142.35 $0.00 4889 01/14/2026 Reconciled 01/14/2026 Accounts Payable WOODARD & CURRAN, INC. $108,235.37 $108,235.37 $0.00 Type EFT Totals: 75 Transactions $2,742,218.19 $2,690,467.25 $0.00 Flagstar AP - Accounts Payable Totals
EFTs Status Count Transaction Amount Reconciled Amount
Open 11 $51,750.94 $0.00
Reconciled 64 $2,690,467.25 $2,690,467.25
Voided 0 $0.00 $0.00
user: Diana Gunn Pages: 2 of 3 Wednesday, January 21, 2026 149
Payment Register
City of Adelanto
From Payment Date: 1/22/2025 - To Payment Date: 1/21/2026 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Total 75 $2,742,218.19 $2,690,467.25
All Status Count Transaction Amount Reconciled Amount
Open 11 $51,750.94 $0.00
Reconciled 64 $2,690,467.25 $2,690,467.25
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 75 $2,742,218.19 $2,690,467.25
Grand Totals:
EFTs Status Count Transaction Amount Reconciled Amount
Open 11 $51,750.94 $0.00
Reconciled 64 $2,690,467.25 $2,690,467.25
Voided 0 $0.00 $0.00
Total 75 $2,742,218.19 $2,690,467.25
All Status Count Transaction Amount Reconciled Amount
Open 11 $51,750.94 $0.00
Reconciled 64 $2,690,467.25 $2,690,467.25
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 75 $2,742,218.19 $2,690,467.25
user: Diana Gunn Pages: 3 of 3 Wednesday, January 21, 2026 150
ADELANTO WASTEWATER TREATMENT
PLANT
Asset Management and Operations & Maintenance Report
City of Adelanto
151
December 2025
Adelanto Wastewater Treatment Plant
Jessie Flores
City Manager
11600 Air Expressway
Adelanto, CA. 92301
RE: December 2025 Adelanto WWTP Asset Management Monthly Report Dear Jessie,
Please find attached the December 2025 Asset Management Report for the Adelanto Wastewater Treatment Plant (WWTP). This report provides a summary of key operational activities, performance metrics, compliance status, and any notable issues encountered during the reporting period.
Key Highlights:
- Plant Performance: All influent was successfully treated by Adelanto WWTP. All other constituents with the PERC Water-Adelanto WWTP remained compliant with the discharge requirements specified in Order No. RV6 -2014-0058, WDID No. 6B369805001. - Critical Issues: 13-Year-old SCADA radio communications equipment is failing. It’s recommended to replace radios with fiber optic hard wiring.
- Maintenance & Repairs: see attached CMMS work.
We appreciate your continued partnership and remain committed to ensuring efficient and compliant operations at the Adelanto Wastewater Treatment Plant. Please do not hesitate to reach out should you have any questions or require further details.
We look forward to discussing this report further at our next meeting.
Best regards,
Dave Kachelski
David Kachelski
Chief Plant Operator
PERC Water Corporation
CC: Christopher Maines, Regional Director, PERC Water Corporation 152
December 2025
Adelanto Wastewater Treatment Plant
October 2025
TABLE OF CONTENTS
Section A
Executive Summary
Section B
Wastewater Treated Flow
Section C
Water Quality and KPIs
Section D
Regulatory Compliance
Section E
Operations & Maintenance
Section F
Financial Update
Section G
Action Items Requiring Approval
Section H
Environmental Health and Safety
Section I
Personnel
Section J
Public Outreach
Section K
Appendix
153
Section A
Executive Summary
154
December 2025
Section A – Executive Summary
Executive Summary
Adelanto WWTP received 103,668 million gallons of raw sewage and successfully treated 103,668 million gallons during the month of December 2025, making the total treated amount of water recycled at the Adelanto WWTP about 12.258 billion gallons (since operating services began in April 2012). The characteristics of the water entering and exiting the plant last month are detailed in the section titled “Flows and Laboratory Results.” Secondary effluent from the Facility was discharged to percolation basins 1, 4, 5, & 9 per the discharge requirements for this period. No flow was diverted to VVWRA.
During December, the daily influent flow recorded an average of 3.344 million gallons per day.
Effluent flow is calculated by subtracting the treated flow minus the Waste Activated Sludge (WAS) flow for each day and the daily calculated effluent flow averaged 3.267 million gallons per day.
Throughout the month, PERC Water’s Asset Management Team performed daily process control sampling and analysis, trend analysis, equipment verification checks, compliance sampling, housekeeping, process adjustments, and solids processing. Please see “Plant Staffing” for details about PERC Water’s dedicated Adelanto WWTP team. There were no injuries, accidents, facility tours, regulatory meetings, odor complaints, or security issues this month. No flow was diverted to VVWRA.
No violations or injuries to report for the month of December 2025 155
Section B
Wastewater Treated Flow
156
December 2025
Section B – Wastewater Treated Flow
Wastewater Treated Flow
Wastewater Treated (MG) 3.344
Design Flow (MGD) 4.000
2.00 2.20
2.40 2.60
2.80 3.00
3.20 3.40
3.60 3.80
4.00 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Adelanto WWTP Influent average & peak flows MGD
Ave Peak
157
Section C
Water Quality and KPIs
158
December 2025
Section C – Water Quality and Key Performance Indicators Water Quality and Key Performance Indicators
Permit Parameters Target Actual Remarks
Effluent BOD (mg/L) 15 5.72 No Violation
Total Nitrogen <10 3.3 No Violation
TSS (mg/L) N/A 3.0 No Permit Limit
Peak Flow (MGD) <3 4.081 Flow greater than
design
Energy Usage (kWh) N/A 31.6 SCE
Solar (kWh) N/A 7.4 SOLAR USAGE
Permit Compliance 100% 100% No Violations
0.00 1.00
2.00 3.00
4.00 5.00
6.00 7.00
8.00 9.00
Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Adelanto WWTP effluent BOD, TSS, & TN, mg/l
BOD TSS TN
159
Section D
Regulatory Compliance
160
December 2025
Section D – Regulatory Compliance
Regulatory Compliance
Permits and Reporting:
Permits Compliance Summary Yes
Monthly Reports Submitted Yes
Inspection/Audit Findings Last inspection January 2025
161
Inf Flow Inst Peak Flow Eff. Q ponds Pond # 1 Pond # 2 & 3 Pond # 4 Pond # 5 Pond # 9 Basin N Basin S MGD GPM MGD freeboard ft freeboard ft freeboard ft freeboard ft freeboard ft freeboard ft freeboard ft 12/1/2025 3.329 3,406.64 3.329 24.00 Empty 16.00 12.25 16.00 2.29 2.55 12/2/2025 3.368 3,405.46 3.368 24.00 Empty 16.00 12.00 16.00 3.11 3.19 12/3/2025 3.340 3,305.12 3.340 24.00 Empty 16.00 12.00 16.00 3.12 3.25 12/4/2025 3.297 3,311.98 3.297 24.00 Empty 16.00 12.00 16.00 2.29 2.64 12/5/2025 3.197 3,067.85 3.197 24.00 Empty 16.00 12.00 16.00 3.33 3.35 12/6/2025 3.233 3,040.09 3.233 24.00 Empty 16.00 11.00 16.00 3.32 3.37 12/7/2025 3.246 3,292.52 3.246 24.00 Empty 16.00 11.00 16.00 3.07 3.14 12/8/2025 3.300 3,457.25 3.300 24.00 Empty 16.00 11.75 16.00 2.91 3.01 12/9/2025 3.271 3,316.71 3.271 24.00 Empty 16.00 11.50 16.00 2.98 3.09 12/10/2025 3.296 3,235.62 3.296 24.00 Empty 16.00 11.50 16.00 2.63 2.44 12/11/2025 3.326 3,200.76 3.326 24.00 Empty 16.00 11.50 16.00 2.98 2.71 12/12/2025 3.234 2,919.52 3.234 24.00 Empty 16.00 11.25 16.00 3.28 2.93 12/13/2025 3.134 2,961.47 3.134 24.00 Empty 16.00 11.00 16.00 3.31 2.95 12/14/2025 3.273 3,220.62 3.273 24.00 Empty 16.00 11.00 16.00 3.34 2.97 12/15/2025 3.281 3,314.69 3.281 24.00 Empty 16.00 10.75 16.00 3.28 2.89 12/16/2025 3.326 3,348.02 3.326 24.00 Empty 16.00 10.50 16.00 2.98 2.70 12/17/2025 3.389 3,287.11 3.389 24.00 Empty 16.00 10.50 16.00 2.81 2.63 12/18/2025 3.354 3,241.59 3.354 24.00 Empty 16.00 10.50 16.00 3.21 2.90 12/19/2025 3.240 3,051.84 3.240 24.00 Empty 16.00 10.50 16.00 3.36 3.00 12/20/2025 3.278 3,037.24 3.278 24.00 Empty 16.00 10.50 16.00 2.65 2.55 12/21/2025 3.240 3,097.79 3.240 24.00 Empty 16.00 10.50 16.00 2.47 2.40 12/22/2025 3.334 3,217.78 3.334 24.00 Empty 16.00 10.50 16.00 2.40 2.40 12/23/2025 3.465 3,159.75 3.465 24.00 Empty 16.00 10.50 16.00 2.44 2.44 12/24/2025 4.081 4,518.48 4.081 24.00 Empty 16.00 10.25 16.00 3.53 2.93 12/25/2025 3.386 3,069.31 3.386 24.00 Empty 16.00 9.75 16.00 3.37 2.99 12/26/2025 3.246 3,253.70 3.246 24.00 Empty 16.00 9.75 16.00 2.70 2.44 12/27/2025 3.396 3,228.41 3.396 24.00 Empty 16.00 9.50 16.00 3.11 2.81 12/28/2025 3.304 3,197.65 3.304 24.00 Empty 16.00 9.25 16.00 3.11 2.76 12/29/2025 3.414 3,338.4 3.414 24.00 Empty 16.00 9.00 16.00 3.03 2.67 12/30/2025 3.494 3,260.7 3.494 24.00 Empty 16.00 9.00 16.00 2.43 2.62 12/31/2025 3.600 3,503.9 3.600 20.00 Empty 16.00 11.00 16.00 3.14 2.80 Total 103.668 103.668
Average 3.344 3,266.71 3.344 23.871 16.00 10.77 16.00 2.97 2.82 Maximum 4.081 4,518.48 4.081 24.000 0.00 16.00 12.25 16.00 3.53 3.37 Minimum 3.134 2,919.52 3.134 20.000 0.00 16.00 9.00 16.00 2.29 2.40 Rain event Effluent Calculated by subtracting WAS flow each day ADELANTO WWTP SUMMARY REPORT December-25
Date
Flow Data Percolation Ponds Biolac Basins
162
BOD5 TSS pH D.O. EC TN TDS MBAS BOD5 TSS pH EC
mg/l mg/l pH units mg/l umho/cm mg/l mg/l mg/l mg/l mg/l pH units umho/cm 12/1/2025
12/2/2025
12/3/2025 5 ND 3.0 6.60 1.99 848.00 6.7 520 0.02 190 170 7.40 1200.00 12/4/2025
12/5/2025
12/6/2025
12/7/2025
12/8/2025
12/9/2025
12/10/2025 5 ND 3.0 6.61 2.02 848.00 3.0 260 220 6.55 1719.00 12/11/2025
12/12/2025
12/13/2025
12/14/2025
12/15/2025
12/16/2025
12/17/2025 5 ND 1.0 6.72 2.03 849.00 1.9 520 0.03 310 280 7.69 1292.00 12/18/2025
12/19/2025
12/20/2025
12/21/2025
12/22/2025
12/23/2025 5.300 3.0 6.69 2.16 841.00 2.2 260 180 6.90 1264.00 12/24/2025
12/25/2025
12/26/2025
12/27/2025
12/28/2025
12/29/2025
12/30/2025
12/31/2025 8.300 5.0 6.65 2.01 801 2.6 210 280.00 6.89 13.91 Total
Average 5.720 3.00 6.65 2.04 837 3.3 520 0.08 246 226 7.09 1098 Maximum 8.30 5.0 6.72 2.16 849 6.7 520 0.08 310 280 7.69 1719 Minimum 5.00 1.0 6.60 1.99 801 1.9 520 0.08 190 170 6.55 14
ADELANTO WWTP SUMMARY REPORT
Date
Effluent WEEKLY Influent
163
Section E
Operations and Maintenance
164
December 2025
Section E – Operations and Maintenance
Operations and Maintenance
OPERATIONAL DETAILS
Average Daily Flow (MGD) 3.344
Peak Daily Flow (MGD) 4.081
MAINTENANCE ACTIVITIES
Number of Work Orders: [VALUE]
Current Month Prior Month
Opened Closed Opened Closed
Preventative Maintenance 39 39 ~71 ~71
Corrective Maintenance 1 1 1 1
Emergency Repairs 0 0 2 2
Total
EMERGENCY CALLOUTS
Date/Time Cause Response Resolution
12-15-25/1800 Smart cover alarm, Auburn &
Bellflower
Operator onsite:
monitoring levels,
check city lines
upstream, checked
influent flow.
Unknown why high
level came from
12-24-25/1619 Smart cover alarm, Auburn &
Bellflower
Operator onsite:
monitoring levels,
check city lines
upstream, checked
influent flow.
Due to rain event
165
December 2025
Section E – Operations and Maintenance
-
Maintenance tasks were carried out:
PERC staff working with PERC construction SCADA logic settings throughout the month. PERC staff cleaning plant throughout the month.
On 12-4-25 PERC staff calibrated pH and EC influent probes. On 12-17-25 PERC staff received oil & grease product from Beck oil. On 12-18-25 PERC staff repairing broken basin chain to South basin chain 2 & North basin chain 7.
On 12-22-25 PERC staff replaced warranty EC probe.
On 12-23-25 PERC staff changed oil to North clarifier drive unit. On 12-30-25 PERC staff changed oil to South clarifier drive unit. Test run standby generator weekly for emergency- operation if needed. Performed weed abatement and grease ball removal throughout the month. 166
December 2025 Section E Completed Work Orders
Adelanto Wastewater Treatment System
Completed Work Orders
Below is a list of Adelanto’s Wastewater System’s completed work orders for the month of December: 39 tasks completed.
Completed
Date
Asset ID Asset
Description
Brief
Description
Date Completed
ADBASINS North and South
basins
Adelanto
WWTP
Flexing
(Cleaning
diffusers with air
pressure)
12/18/2025
AD_GD Multi gas detector Adelanto
WWTP
Multi Gas
Detector
Calibration
12-18-25 Altair 4x
pass / Ventis MX4
fail need new gas
cylinder ran out of
gas mid calibration.
Industrial Scientific
PT# 1810-9155
ADPOLYU
NIT
Polymer unit Adelanto
WWTP
Clean polymer
flow sensor
12/2/2025
AD_SHPOL-MPolymer Motor Adelanto
WWTP
polymer pump
gear box oil
check
12/2/2025
AD_SH_AN
DRITZ
Andritz Centrifuge Adelanto
WWTP
Lubricate
support bearing
and motors
12-18-25 Has not
run long enough for
this work order
AD_SH_AN
DRITZ
Andritz Centrifuge Adelanto
WWTP
3000 hour
andritz
maintenance
12-18-25 Has not
run long enough for
this work order
AD_SH_AN
DRITZ
Andritz Centrifuge Adelanto
WWTP
Check Andritz
manual for
service
12-18-25 Has not
run long enough for
this work order
AD_SH_AN
DRITZ
Andritz Centrifuge Adelanto
WWTP
Change oil on
conveyor
gearbox
12-18-25 Has not
run long enough for
this work order
AD_SH_AN
DRITZ
Andritz Centrifuge Adelanto
WWTP
Run Andritz
centrifuge
12-18-25 Turned by
hand / needs
service from Andritz
or Centrix
BELLFLOW
ER_AUBU
RN
Collection Systems Adelanto
WWTP
Manhole
inspection
12-18-25 Checked
through smartcover
website / app daily
AD-FAK First aid kits Adelanto
WWTP
Monthly first aid
kits check
12/22/2025
167
December 2025 Section E Completed Work Orders
Adelanto Wastewater Treatment System
AD-PORTGENGenerators Adelanto
WWTP
RUN
PORTABLE
GENERATOR
FOR 15
MINUTES
12/22/2025
ADELPNFL
TS
FILTERS Adelanto
WWTP
Clean VFD
Panel Filters
12/22/2025
ADEYEWS
HST
eye wash Adelanto
WWTP
eye
wash/shower
weekly check
12/22/2025
ADPLGPD1 Pipe Plug (pig) Adelanto
WWTP
Check plug 12/22/2025
AD_HAZWSTHaz waste check
sheet
Adelanto
WWTP
Check AGST
binder and make
sure it is up to
date
12/22/2025
AD_HWGP-P1Grit Pump 1 Adelanto
WWTP
grit pump check 12/22/2025
AD_HWGP-P1Grit Pump 1 Adelanto
WWTP
grit pump belt
check
12/22/2025
AD_HWGP-P2Grit Pump 2 Adelanto
WWTP
grit pump check 12/22/2025
AD_HWGP-P2Grit Pump 2 Adelanto
WWTP
grit pump belt
check
12/22/2025
AD_HAZWSTHaz waste check
sheet
Adelanto
WWTP
Check and fill
out weekly
check sheet
12/22/2025
AD_SCCLRFYR-NNorth Clarifier Adelanto
WWTP
Weekly Clarifier
check
12/22/2025
AD_SCCLRFYR-SSouth Clarifier Adelanto
WWTP
Weekly Clarifier
check
12/22/2025
FIREEXTR Fire Extinguisher Adelanto
WWTP
fire extinguisher
inspection
12/22/2025
ADFRTGTEFront gate wheel
bearings
Adelanto
WWTP
LUBE WHEELS
ON FRONT
GATE
12/26/2025
ADBASINS North and South
basins
Adelanto
WWTP
Internal recycle
pumps
12/26/2025
AD_8INPO
RTPMP
8 Inch portable
pump
Adelanto
WWTP
Run 8 in
portable pump
12/26/2025
AD_AZ_BL
WR1
Aerzen Blower 1 Adelanto
WWTP
Change and
wash pre-filters
12/26/2025
AD_AZ_BL
WR2
Aerzen Blower 2 Adelanto
WWTP
Change and
wash pre-filters
12/26/2025
AD_AZ_BL
WR3
Aerzen Blower 3 Adelanto
WWTP
Change and
wash pre-filters
12/26/2025
168
December 2025 Section E Completed Work Orders
Adelanto Wastewater Treatment System
AD_BLWR
_BLD
BUILDINGS Adelanto
WWTP
Replacement of
Blower Building
Filters
12/26/2025
AD_HWFR-EFlex Rake East Adelanto
WWTP
Flexrake check 12/29/2025
AD_HWFR-EFlex Rake East Adelanto
WWTP
Quarterly
flexrake check
12/29/2025
AD_HWFR-EFlex Rake East Adelanto
WWTP
Annual flexrake
maintenance
12/29/2025
AD_HWFR-WFlex Rake West Adelanto
WWTP
Flex rake Check
drive and
bearings
12/29/2025
AD_HWGC-CPT1Grit Collector CPT 1 Adelanto
WWTP
Monthly cpt
inspection
12/23/2025
AD_HWGC-CPT2Grit Collector CPT 2 Adelanto
WWTP
Monthly cpt
inspection
12/23/2025
AD_POND
S
Percolation Ponds Adelanto
WWTP
Rotate ponds 12/30/2025
AD_TRAC Tractor Adelanto
WWTP
Check oil in
tractor
12/28/2025
169
Section F
Financial Update
170
December 2025
Section F – Financial Updates
Financial Update
Monthly Chemical Consumption
Chemical Name Total Consumption (gallons)
POLYMER 419.2
N/A N/A
Monthly Power Consumption
Power Source Total Consumption (kWh)
SCE 980
SOLAR 230
Chemical and Bio-solids Costs
Current Month Year-to-Date Spend
POLYMER $7,590 $60,720
Bio-Solids hauling/tipping fee $14,711.99 $275,447.63
Client Reimbursable Expenses
Current Month Year-to-Date Spend
[MAINTENANCE & REPAIR] $0 $7,336.85
[CAPITAL PROJECTS] [$0] [$0]
171
December 2025 Section D – Bio-solids Report
Adelanto Wastewater Treatment System
Bio-solids Report
In December 2025, PERC Water Staff performed dewatering procedures to dewater 1,838,627 gallons of bio-solids from the aerated solids holding tank. See data table below for amounts and disposal costs. Wet tons of bio-solids were removed at an average total solids concentration of 21%. End dump trailers were collected periodically by GIC Corporation and delivered to Synagro composting facility in Helendale, CA.
Wet Tons Dry Tons Wet Tons Dry
Tons
January 295.29 55.22 12 12 $4,709.88 $9,611.69 $14,321.57 $48.50 February 272.84 51.02 11 11 $4,351.80 $8,880.94 $13,232.74 $48.50 March 265.93 49.73 834.06 155.97 11 11 $4,241.58 $8,656.02 $12,897.61 $48.50 April 279.43 55.89 11 11 $4,456.91 $9,095.45 $13,552.36 $48.50 May 269.50 53.90 11 11 $4,298.53 $8,772.23 $13,070.75 $48.50 June 241.42 48.28 790.35 158.07 10 10 $3,850.65 $7,858.22 $11,708.87 $48.50 July 263.15 57.89 11 11 $4,197.24 $8,565.53 $12,762.78 $48.50 August 1470.23 323.45 58 57 $23,450.17 $47,855.99 $71,306.16 $48.50 September 1933.07 425.28 3666.45 806.62 78 78 $30,832.47 $62,921.43 $93,753.90 $48.50 October 199.68 41.93 8 8 $3,184.90 $6,499.58 $9,684.48 $48.50 November 258.61 54.31 10 10 $4,124.83 $8,417.76 $12,542.59 $48.50 December 303.34 63.70 761.63 159.94 12 12 $4,838.27 $9,873.72 $14,711.99 $48.50 Total Tons 6052.49 1280.60 6052.49 1280.60 243 242 $96,537.22 $197,008.55 $293,545.77 $48.50 Metric Tons 5489.61 1161.50 5489.61 1161.50 total total total total total average 2025 BIO-SOLIDS HAULED
Adelanto production Quarter # of GIC
end
dump
Removed
# Synagro
loads
received
Total Hauling
Cost
Total Tipping
Fee Cost
Total Cost Total Cost
Per Ton
172
December 2025 Section D – Bio-solids Report
Adelanto Wastewater Treatment System
Burrtec hauls off screenings/rags and recycle product from the facility each month. See data table below for bins removed from the Facility.
RECYCLE
# of Bins ft3
yards # of Bins
January 24 48 2
February 20 40 2
March 20 40 1
April 20 40 2
May 24 48 1
June 21 42 1
July 28 56 1
August 22 44 0
September 16 32 1
October 18 36 1
November 14 28 1
December 22 44 1
Total 249 498 14
2025 SCREENINGS/GRIT HAULED
173
Adelanto Wastewater CIP 2024-25
Project # Estimated
Cost
Project
start
date
$'sspent
to date
Scope Comments Status
1 $1,800,000 22-23 Expand WWTP to 3.7-4.0
MGD. Budget 2023-24
Install 5th influent pump, 4th turbo
blower, replace DO probes, install
NO3 probes, add polymer at sec
clarifier, upgrade water system.
WWTP at 3.0 MGD Ave daily flow.
Construction in progress.
2 ? 23-24 Steelwave liftstation
Steelwave is North of WWTP.
Needs pump station & force main
south to WWTP. Unknown status
3 ~$5,000,000 24-25 Pump tertiary treated
effluent to south of SCLA
for city water wells
replenishment
Install tertiary treatment.
Acquire land, install pipe, build
ponds
Unknown status
4 ? 24-25 Perform master plan and
include reclaimed water Post RFP,select consultant. Engineering is waiting on GIS mapping to be complete
5 ? 24-25 GIS mapping Upgrade mapping system in progress 6 ? 24-25
Investigate modeling
sewer collection
bottleneck location
Look more indepth at locationsto
determine needs for growth Notstarted
7 ? 24-25
Design, Bid, construct,to
make Title 22 water at
wwtp
Equipment onsite, but some
replacement equipment
needed, and new analyzers,
safety upgrades along with
SCADA tie ins and title 22 eng
report.
Unkown status.
8 ? 24-25
Purple piping to new
parks and localschool
districtslandscaping
Design, bid, construct Unknown status
9 ~$50,000 20-21 Muskrat sewer lift
Station.
install radio communcation and
ancillary equipment to allow data
to existing WWTP SCADA system.
Includes programming, parts and
alarm notifications.
Obtained bids, waiting for
budget approval
10 ~$150,000 21-22
Upgrade cleanoutsto
manholesfor
maintenance
access.
There are several cleanouts in
Joshua Estates that can't be
maintained. Convertto manholes
for cleaning maintenance
Obtained bids, waiting for
budget approval
11 ~$400,000 21-22 Purchase CCTV Van for
locating and raising
buried Manholes.
There are many manholes that
are below ground surface for >20
years. Locate & raise to grade.
Cannot perform maintenance of
sewer lines.
Obtained bids, waiting for
budget approval
12 ~$200,000 Ponds 2 & 3
Pond 2 & 3 rehabilitation to
emergency bypass ponds pursuant
to 2013 Application for Waste
Discharge.
Notstarted
13 ~$2,000,000 24-25
Move effluent ponds
North or GAFB Acquire land, build ponds Unknown status
174
Adelanto Wastewater Completed CIP 2020-25
Estimated costs
Completed
date
Actual
costs Project Description remarks
$1,500,000 2/1/22 ? Increase Sewer Main Capacity
carryover from 2019-20
Install parallel sewer main on Pairmain St. to relieve surcharged sewer condition observed on Jonathan St. sewer main.
COMPLETED
$750,000.00 9/1/21 $749,995.00
WWTP Dewatering System
carryover from 2018-19
1. Engineer, purchase, install new centrifuge. Demo of old unit.
Original centrifuge not sized for increased flows and nonoperational
2. Rezise existing sludge feed pump and polymer feed unit.
3. Repair existing grinder/macerator ("muffin monster"). COMPLETED $5,000.00 $5,423.41 "Smart covers" # 6 manhole level and flow monitoring sensing device.
Additional smart cover for lift station manhole to prevents sewer spills and vandalism spills. 10 years with battery replacement every two years
RECEIVED
COMPLETED
$11,000.00 $10,846.82 "Smart covers" # 4 & 5 manhole level and flow monitoring sensing device.
Additional smart cover for lift station manhole to prevents sewer spills and vandalism spills. 10 years with battery replacement every two years
RECEIVED
COMPLETED
$11,000.00 10/15/21 $10,416.82 "Smart covers" # 2 & 3 manhole level and flow monitoring sensing device.
Surcharged manholes at trunck sewer at Auburn/Bellflower. 10 years with battery replacement every two years
RECEIVED
COMPLETED
$5,000.00 2/20/20 $4,743.32 "Smart covers" # 1 manhole level and flow monitoring sensing device.
Surcharged manhole at trunck sewer at Jonathan/Bartlett. 10 years with battery replacement every two years
RECEIVED
COMPLETED
$50,000.00 8/1/20 $48,000.00
Influent Lift Station Pump
carryover from 2019-20
Reconfigure Influent lift station pump control wiring. Wires were cut during bypass of influent to VVWRA. Pump currently has no operational signals. System could overflow or pump could overheat. Reconfigure Influent lift station pump control logic for interlocked operation with other pumps on new SCADA. COMPLETED $75,400.00 Manhole (4) Rehabilitation
carryover from 2019-20
Deteriorated manholes at Aster & Vintage require urgent replacement. Includes bypass pumping. COMPLETED
$55,500 7/1/22 $51,500 Remove GE SCADA PLC. Budgeted 2021-22 GE SCADA PLC from blower installed in 1998. GE interferes at times with newer SCADA PLC hardware COMPLETED
? 6/4/25 ?
Install Auburn & 395 parallelsewer main
Installed parallel sewer main on Auburn under Hwy 395. to relieve surcharged sewer condition. COMPLETED
? 7-1-22 $51,500 Remove GE SCADA PLC. Budgeted 2021-22 GE SCADA PLC from blower installed in 1998. GE interferes at times with newer SCADA PLC hardware
COMPLETED
9-2025 Pearmain & Taylor collection system:
surgcharging
Project consists of replacement of
~180 feet of sewer.
COMPLETED
$500,000 9-2025 ~$325,000 rehabilitate pond 1. Remove dried solids, remove center berm, weed/brush/tree abatement. Regrade slopes with berm dirt, scarify minumum 24 inches
COMPLETED
175
Section G
Action Items Requiring
Approval
176
December 2025
Section G – Action Items Requiring Approval
Action Items Requiring Approval
We request the review and approval of the following proposed repairs and capital improvements on the facility.
Request Impact Estimated Cost
Convert radio
communications to fiber
optics
Reduced down time for
SCADA communications and
eliminate non-essential
alarms
?
Install electrical grounding
system to prevent static
electrical damage
All sensitive electrical
components are subject to
static electricity
$22,000
177
Section H
Environmental Health and
Safety
178
December 2025
Section H – Environmental Health and Safety
Environmental Health and Safety
No injuries this month, no recordable incidents since September 2012.
Performed monthly toolbox topics, and online safety training:
Online training: Electrical Arc flash, Applying electrical standards, active shooter: law enforcement, e-Gress and emergency action plan awareness, work zone safety, Part 1:
preparation.
Toolbox topics: Lockout Tagout, Arc Flash, Electrical safety: avoiding shock, & Heart attacks 179
Section I
Personnel
180
December 2025
Section I – Personnel
Personnel
David Kachelski – Chief Plant Operator V
Tristan Hause – Lead Wastewater Operator III
James Strang – Operator II
Scott Heller – Operator I
181
Section J
Public Outreach
182
December 2025
Section J – Public Outreach
Public Outreach
Attended Mojave Water Agency Board of Directors zoom meetings on December 11 this month. 183
Section K
Appendix
184
December 2025
Section K – Appendix
Data Logs
[see section D]
Photos
Weed removal
185
December 2025
Section K – Appendix
Grease balls in influent
Grease balls removed
186
December 2025
Section K – Appendix
A/C Heater unit froze
Additional Documentation
Sewer collections report
GW Monitoring report
187
PROJECT STATUS REPORT & PROJECTIONS
Project Name: City of Adelanto
Department: Collection System
Month: December 2025
Prepared By: PERC Water Corporation
PROJECT STATUS REPORT
Date Footage
Mo/Yr Area Locations That Need Attention
November
2025
4460 / 119,668 • North, middle,
south end of
town
• Monthly/quarterly enhanced
maintenance areas
LIST OF NOTES:
01) PERC staff received and reviewed 200+ USA dig alerts. 188
MONTHLY Map pg. JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Date Date Date Date Date Date Date Date Date Date Date Date Bellflower & Auburn 460 N 500 W 13-Jan 20-Feb 27-Mar 12-May 16-Jun 5-Aug 30-Sep 2-Oct 18-Nov 16-Dec 1st Mh W 395 & Auburn 400 W 13-Jan 20-Feb 27-Mar 12-May 16-Jun 5-Aug 30-Sep 2-Oct 18-Nov 16-Dec 1st Mh E 395 & Auburn 500 W 13-Jan 20-Feb 27-Mar 12-May 16-Jun 5-Aug 30-Sep 2-Oct 18-Nov 16-Dec Pearmain & Taylor 275 S & 285 W 8 13-Jan 20-Feb 27-Mar 12-May 16-Jun 5-Aug 30-Sep N/A N/A N/A Pearmain & Cactus 300 E & 400 S 10 13-Jan 20-Feb 27-Mar 12-May 16-Jun 5-Aug 30-Sep N/a N/a N/a 1st Mh W Aster & Vintage 500 W 41 13-Jan 20-Feb 27-Mar 12-May 16-Jun 5-Aug 30-Sep 2-Oct 18-Nov 16-Dec Aster & Vintage 500 W 41 13-Jan 20-Feb 27-Mar 12-May 16-Jun 5-Aug 30-Sep 2-Oct 18-Nov 16-Dec
BI-MONTHLY JAN MAR MAY JUL SEP NOV
QUARTERLY JAN APR JUL OCT
Verbena & Mojave W 500 W & S 13-Jan 12-May 5-Aug 2-Oct
1st mh N Forest & Muskrat 500 N&S 13-Jan 12-May 5-Aug 2-Oct Joshua & Verbena 200 W 13-Jan 12-May 5-Aug 2-Oct
Cactus & Caliente 400 W 13-Jan 12-May 5-Aug 2-Oct
Bartlett & Lilac 13-Jan 12-May 5-Aug 2-Oct
BI-ANNUAL JAN JUL
189
City of Adelanto Enhanced Maintenance Collection System Operator: Dutch Month: December 2025 Date Location Street & Cross Street Feet
Cleaned
Comments
1 12/16/2025 Vintage 500 Cleaned west surcharged
2 12/16/2025 Aster & Vintage 500 Cleaned west surcharged 3 12/16/2025 4th MH E Auburn & 395 500 Cleaned west grease in MH surcharged 4 12/16/2025 3rd MH E Auburn & 395 500 Cleaned west grease in MH surcharged 5 12/16/2025 2nd MH E Auburn & 395 500 Cleaned west grease in MH surcharged 6 12/16/2025 1st MH E Auburn & 395 500 Cleaned west grease in MH surcharged 7 12/16/2025 1st MH W Auburn & 395 500 Cleaned west grease in MH surcharged 8 12/16/2025 Bellflower & Auburn 460 Cleaned north grease in MH surcharged 9 12/16/2025 Bellflower & Auburn 500 Cleaned west grease in MH surcharged 10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 ^
Total Feet 4,460
190
5122 Bolsa Avenue, Suite 107• Huntington Beach, CA 92647 • (P) 714.890.7129 • (F) 714.890.7149 www.atlasenvironmental.com • License Number A729641
Since 1991
Remediation
Design and
Implementation
Programs
Groundwater,
Soil and Air
Compliance
Sampling and
Reporting
Phase I and II
Commercial and
Industrial Site
Assessments
Discharge
Permitting
Spill Prevention,
Countermeasur
es and Control
Environmental
Health and
Safety Specialists
Feasibility and
Risk Analysis
Hazardous
Waste
Management
and Monitoring
December 28, 2025
Mr. David Kachelski
Chief Plant Operator, Perc Water
City of Adelanto Waste Water Treatment Plant
11600 Air Expressway
Adelanto, California 92301
RE: Adelanto Waste Water Treatment Plant
Groundwater Monitoring Report
October 2025 Sampling
WDID No. R6V-2013-0058
Dear Mr. Kachelski,
Atlas Environmental Engineering, Inc. (ATLAS) is pleased to present the enclosed the Groundwater Monitoring Report – October 2025 Sampling, dated December 28, 2025, for the above referenced project. The report describes the semi-annual groundwater monitoring and sampling activities that occurred at the Adelanto Wastewater Treatment Plant. All sampling activities were conducted as outlined in the adopted board order #R6V-2013-0058. If you have any questions or require any additional information, please contact me at (714) 890-7129.
Sincerely,
ATLAS ENVIRONMENTAL ENGINEERING, INC.
Karl H. Kerner, P.E.
Senior Engineer
191
GROUNDWATER MONITORING REPORT
OCTOBER 2025 SAMPLING
ADELANTO WASTE WATER TREATMENT PLANT
ADELANTO, CALIFORNIA
December 28, 2025
Prepared for:
City of Adelanto Waste Water Treatment Plant
11600 Air Expressway
Adelanto, California 92301
Prepared by:
ATLAS ENVIRONMENTAL
ENGINEERING, INC.
5122 Bolsa Avenue, Suite 107
Huntington Beach, California 92649
(714) 890-7129
192
SITE LOCATION: Adelanto Waste Water Treatment Plant
OWNER/OPERATOR: City of Adelanto / PERC Water
CONTACT: Mr. David Kachelski
LEAD AGENCY: Lahontan Regional Water Quality Control Board Introduction
Site Activities this Quarter
permit compliance.
Well MW-4 was located and sampled during this monitoring event.
All other groundwater monitoring wells were gauged and sampled as outlined in the WDR permit. Field data was recorded onto Project Status Reports and included in Appendix B.
Well MW-1 was replaced with well MW-1A and therefore MW-1 was not sampled.
Gauging data from well BZ-01 was coordinated with the adjacent former George Air Force Base.
The gauging of well BZ-01 was conducted on an alternate date (November 11, 2025).
Groundwater gauging summary for BZ-01 is included in Appendix C.
Appendix B. Well locations and groundwater elevation contours are included as Figures 2 and 3.
Groundwater monitoring well completion data, current groundwater elevation data and groundwater analytical results are included as Tables 1 and 2.
Groundwater elevation over Time Graph is included as Figure 4.
Nitrate as Nitrogen Concentrations over Time Graph is included as Figure 5.
October 8, 2025 Analytical Report and associated Chain-of-Custody are included in Appendix D.
Future Site Activities
Gauging Summary
Total Groundwater Monitoring Wells: 10
Groundwater Monitoring Wells Gauged this Quarter: 10
Groundwater Monitoring Wells Sampled this Quarter: 10
Depth to Groundwater (ft bgs): 31.13 (MW-1A) to 60.88 (MW-9) SC Logistic Airport Well (Former George AFB) (ft bgs): 56.25 BZ-01 Groundwater Elevation (msl): 2774.72 (MW-9) to 2814.42 MW-1A Groundwater Gradient (ft/ft):
Groundwater Flow Direction:
Field Measurements
Conductivity 876 MW-5 to 1000 MW-9
pH 6.43 MW-1A to 7.09 MW-6
Temperature 21.35 MW-2 to 22.80 MW-9
Dissolved Oxygen 2.26 MW-8 to 5.80 MW-9
Turbidity 0.00 MW-1A to 5.60 MW-4
0.1 (North of the Site) / 0.002 (South of the Site)
NTU
All groundwater monitoring wells were analyzed for the constituents listed in the WDR permit. uS/cm
pH Units
mg/L
Measurements
Minimum Detection Maximum Detection Reported In
o
C
GROUNDWATER MONITORING REPORT
OCTOBER 2025 SAMPLING
DECEMBER 28, 2025
On October 8, 2025, groundwater monitoring and sampling were conducted as part of the semi-annual schedule for WDR Approximately 26 gallons of groundwater were purged prior to sampling wells using low flow sampling techniques.
The work has been conducted in accordance with the California Regional Water Quality Control Board Lahontan Region’s Board Order No. R6V-2013-0058 Waste Discharge Requirements (WDR) for Adelanto Waste Water Treatment Plant. A site description and geologic and hydrologic information are included in Appendix A and site vicinity map included as Figure 1.
ADELANTO WASTE WATER TREATMENT PLANT
Purge water was disposed of on adjacent land surfaces at each well. Low flow sampling procedures are included in Semi-annual groundwater monitoring and sampling anticipated for October 2026 and reporting by December 2026.
Variable
5122 Bolsa Avenue, Suite 107 • Huntington Beach, CA 92649 • (P) 714.890.7129 • (F) 714.890.7149 www.atlasenvironmental.com • License Number A729641 AWWTP-OCT2025xls Page 1 of 3 193
Groundwater Analytical Summary
Constituents
TDS 480 MW-1A to 570 MW-9
Total Nitrogen <0.40
MW-3/
MW-8 to 2.80 MW-2
Nitrate as N <0.1 MW-8 to 2.10 MW-5
Chloride 94 MW-1A to 110 MW-9
Sulfate 99 MW-1A to 120 MW-9
Boron 0.1 MW-5 to 0.39 MW-8
Fluoride 0.40 MW-10 to 0.70 MW-2
Closing
Prepared by:
Jasmine F. Dody
Project Scientist
Prepared by:
Karl H. Kerner
Senior Engineer/Project Manager
The work conducted by ATLAS has been performed using generally accepted methods and procedures in the environmental field. ATLAS makes no other warranty, either expressed or implied, concerning the information that is contained within this report. The analysis of the samples were conducted by a California Certified Laboratory, however, no warranty as to the validity of the work conducted by others is implied.
Due to the changing subsurface environment, continuing assessments and/or excavation projects may reveal findings that are different than those which are presented herein. This facet of the environmental profession should be considered when basing professional opinions on limited data collected for the projects performed. This report is valid as of this date. As a result of the passage of time and changing site conditions, deviations to the information contained in this report may occur. Accordingly, information presented in later reports may invalidate this report in partial or whole form. These conditions are beyond the control of ATLAS, and should be considered in basing continuing assessments on the information contained herein after the passage of time.
This report has been prepared by ATLAS for the Adelanto Waste Water Treatment Plant. Submission of this report to the appropriate regulatory agencies/parties is recommended and considered the responsibility of the PERC Water. If you have any questions or require additional information, please contact the undersigned at (714) 890-7129.
5122 Bolsa Avenue, Suite 107 • Huntington Beach, CA 92649 • (P) 714.890.7129 • (F) 714.890.7149 www.atlasenvironmental.com • License Number A729641
(Concentrations reported in mg/L)
Minimum Detection Maximum Detection
Concentrations
Reported In
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
AWWTP-OCT2025xls Page 2 of 3
5122 Bolsa Avenue, Suite 107 • Huntington Beach, CA 92649 • (P) 714.890.7129 • (F) 714.890.7149 www.at asenv ronmenta .com • cense um er
194
Attachments
Figures
Figure 1 - Site Vicinity Map
Figure 2 - Groundwater Monitoring Well Locations
Figure 3 - Groundwater Elevation Contour
Figure 4 - Groundwater Elevation over Time Graph
Figure 5 - Nitrate as N Concentrations over Time Graph
Tables
Table 1 - Groundwater Monitoring Well Completion Data
Table 2 - Current Groundwater Quality Analysis
Table 3 - Historic Groundwater Quality Analysis
Appendix A
Site Description, Geologic and Hydrogeologic Background Appendix B
October 2025 Project Status Reports, Field Data Sheets and Sampling Procedures Appendix C
Historical Groundwater Gauging Summary - BZ-01
Appendix D
October 2025 Analytical Report and Chain-of-Custody
5122 Bolsa Avenue, Suite 107 • Huntington Beach, CA 92649 • (P) 714.890.7129 • (F) 714.890.7149 www.atlasenvironmental.com • License Number A729641
AWWTP-OCT2025xls Page 3 of 3
195
FIGURES
196
USGS Map Name: Adelanto, California
5122 Bolsa Ave, #107
Huntington Beach,
California 92649
ADELANTO WASTE WATER TREATMENT PLANT
19101 JONATHAN STREET
ADELANTO, CALIFORNIA 92301
SITE VICINITY MAP
FIGURE 1
SITE
197
198
199
2750
2760277027802790280028102820
07/06/09 11/18/10 04/01/12 08/14/13 12/27/14 05/10/16 09/22/17 02/04/19 06/18/20 10/31/21 03/15/23 07/27/24 12/09/25 E-Water (ft msl)
Date
FIGURE 4
Groundwater Elevation over Time
Adelanto Wastewater Treatment Plant
Adelanto, California
MW-1AMW-2MW-3MW-4MW-5MW-6MW-7MW-8MW-9MW-10
200
0 2468
10121416182022242628303234363840
07/06/09 11/18/10 04/01/12 08/14/13 12/27/14 05/10/16 09/22/17 02/04/19 06/18/20 10/31/21 03/15/23 07/27/24 12/09/25 Nitrate as N (mg/L)
Date
Figure 5
Nitrate as Nitrogen Concentrations over Time
Adelanto Wastewater Treatment Plant
Adelanto, California
MW-1AMW-2MW-3MW-4MW-5MW-6MW-7MW-8MW-9MW-10
201
TABLES
202
DIAMETER SCREEN Total SWE
(inches) INTERVAL Depth (ft msl)
(ft bgs) (ft bgs)
MW-1 2 150-172 172 -
MW-1A 4 80-100 101 2846.8
MW-2 2 90-120 120 2841.88
MW-3 2 90-120 120 2848.11
MW-4 2 61-101 101 2851.23
MW-5 2 69-114 114 2860.67
MW-6 2 40-89.5 89.5 2835.21
MW-7 4 75-105 106 2844.93
MW-8 4 55-85 86 2835.97
MW-9 4 74-104 105 2835.6
MW-10 4 70-100 101 2853.14
Notes:
SWE - Surveyed Well Elevation
ft msl - Feet Mean Sea Level
ft bgs - Feet Below Ground Surface
WELL ID
TABLE 1
WELL CONSTRUCTION DETAIL
ADELANTO WASTE WATER TREATMENT PLANT
ADELANTO, CALIFORNIA 92301
19101 JONATHAN STREET
203
MW-1A 10/08/25 2846.80 32.38 2814.42 908 6.43 22.50 4.28 0.00 480 0.88 0.62 94 99 0.34 0.5 MW-2 10/08/25 2841.88 31.13 2810.75 908 6.58 21.35 2.95 1.50 510 2.80 <0.20 96 110 0.32 0.7MW-3 10/08/25 2848.11 39.56 2808.55 880 6.85 22.58 2.10 0.00 500 <0.40 0.30 96 100 0.29 0.5MW-4 10/08/25 2851.23 52.45 2798.78 925 6.62 22.76 3.56 5.60 520 1.50 1.30 100 100 0.19 0.5MW-5 10/08/25 2860.67 58.52 2802.15 876 6.56 22.40 4.73 5.00 530 2.20 2.10 100 110 0.10 0.6MW-6 10/08/25 2835.21 36.90 2798.31 897 7.09 22.12 3.00 4.00 520 0.89 0.74 96 110 0.35 0.6MW-7 10/08/25 2844.93 51.87 2793.06 971 6.75 22.70 2.37 3.40 540 1.10 1.00 100 100 0.29 0.5MW-8 10/08/25 2835.97 39.90 2796.07 908 6.82 22.30 2.26 0.00 510 <0.40 <0.1 98 100 0.39 0.5MW-9 10/08/25 2835.60 60.88 2774.72 1000 6.70 22.80 5.80 1.90 570 1.30 1.10 110 120 0.28 0.5 MW-10 10/08/25 2853.14 49.15 2803.99 933 6.72 22.76 4.42 2.30 520 1.30 1.20 100 100 0.22 0.4 SWE TDSDTW ftE-Water ft msl- Not Analyzed std units
NS mg/lN/A J+ Re-sampled on alternate date due to lab holding time expiration for sample 10/18/2021. Nephelometric Turbity Unit NTU Standard pH units
No MCL or California Secondary MCL for Drinking Water Milligram per liter or parts per million Not Available / Not Accessible / No Sample Collected Result is above the MDL, but below the PQL; Value is approximateDepth to Water FeetElevation of Water Feet Mean Sea Level Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Notes:
Survey Well Elevation Total Dissolved Solids
Temperature
(oc)
DO
(mg/L)
Turbidity
(NTU)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
TABLE 2
CURRENT GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Cond.
(uS/cm)
pH
(pH Units)
204
MW-1A 2/23/2012 2844.46 2781.36 5.30 5.3
MW-1A 5/17/2012 2844.46 2781.36 7.80 7.8
MW-1A 8/15/2012 2844.46 2780.98 7.50 7.5
MW-1A 11/15/2012 2844.46 2781.47 7.00 7
MW-1A 2/13/2013 2844.46 2779.36 4.50 4.5
MW-1A 5/16/2013 2844.46 2792.27 21.00 21
MW-1A 7/11/2013 2844.46 2794.56 3.80 3.8
MW-1A 4/18/2014 2844.46 2800.64 0.20 2.7
MW-1A 10/17/2014 2844.46 2798.66 0.34 0.2
MW-1A 4/15/2015 2844.46 2802.66 2.70 0.34
MW-1A 10/22/2015 2844.46 2799.42 0.20 0.2
MW-1A 4/14/2016 2844.46 2798.31 0.44 0.44
MW-1A 10/13/2016 2844.46 2804.7 0.84 0.84
MW-1A 4/14/2017 2844.46 2801.29 1.20 1.2
MW-1A 10/12/2017 2844.46 2801.45 0.51 0.51
MW-1A 4/19/2018 2844.46 2801.67 0.20 0.2
MW-1A 10/18/2018 2844.46 2806.01 0.50 0.5
MW-1A 4/11/2019 2844.46 2805.56 0.17 0.17
MW-1A 10/17/2019 2844.46 2803.36 0.69 0.69
MW-1A 4/16/2020 2844.46 2806.96 0.59 0.59
MW-1A 10/23/2020 2844.46 2803.31 1.60 1.6
MW-1A 4/7/2021 2844.46 42.42 2802.04 903 6.88 18.97 6.22 480.00 1.00 0.73 110 100 0.36 0.5 MW-1A+ 12/03/21 2844.46 36.70 2807.76 840 7.70 21.11 4.11 460.00 0.83 0.83 120 110 0.37 0.5 MW-1A 4/13/22 2844.46 40.06 2804.40 734 7.06 21.66 6.23 6.60 470 0.59 0.43 110 96 0.70 0.5MW-1A 10/19/22 2844.46 36.27 2808.19 776 7.09 25.70 5.32 15.70 510 0.74 0.46 100 100 0.32 0.6MW-1A 4/19/23 2844.46 38.60 2805.86 802 6.90 22.96 3.85 6.90 110 0.73 0.54 110 100 0.38 0.6MW-1A 10/18/23 2844.46 34.45 2810.01 1030 7.35 26.05 4.35 8.70 500 1.90 0.78 97 92 0.32 0.5MW-1A 4/17/24 2844.46 36.85 2807.61 768 8.90 18.42 3.86 0.00 500 0.99 0.79 97 90 0.34 0.5MW-1A 10/08/24 2844.46 34.57 2809.89 897 6.22 23.59 5.53 0.10 460 1.10 0.77 93 88 0.31 0.4MW-1A 4/23/25 2846.80 34.46 2812.34 739 9.42 20.00 9.87 0.00 440 0.89 0.67 94 98 0.32 0.4MW-1A 10/08/25 2846.80 32.38 2814.42 908 6.43 22.50 4.28 0.00 480 0.88 0.62 94 99 0.34 0.5 MW-2 12/18/2010 2839.83 2784.23MW-2 2/23/2011 2839.83 2784.08MW-2 6/9/2011 2839.83 2783.73MW-2 8/22/2011 2839.83 2784.33MW-2 10/24/2011 2839.83 2783.15MW-2 2/23/2012 2839.83 2782.35 0.20 0.2MW-2 5/17/2012 2839.83 2782.63 0.20 0.2 MW-2 8/15/2012 2839.83 2781.59 0.20 0.2
MW-2 11/15/2012 2839.83 2781.61 0.20 0.2
MW-2 2/13/2013 2839.83 2779.46 0.20 0.2
MW-2 5/16/2013 2839.83 2785.9 5.90 0.2
MW-2 10/11/2013 2839.83 2790.33 3.20 3.2
MW-2 4/18/2014 2839.83 2796.02 0.20 0.71
MW-2 10/17/2014 2839.83 2797.93 0.20 0.2
MW-2 4/15/2015 2839.83 2798.32 0.71 0.2
MW-2 10/22/2015 2839.83 2796.04 0.20 0.2
MW-2 4/14/2016 2839.83 2801.08 0.20 0.2
MW-2 10/13/2016 2839.83 2801.58 0.20 0.2
MW-2 4/14/2017 2839.83 2799.33 0.55 0.55
MW-2 10/12/2017 2839.83 2799.33 0.32 0.32
MW-2 4/19/2018 2839.83 2799.98 1.20 1.2
Cond. (uS/cm) pH (pH Units)
TABLE 3
HISTORICAL GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Temperature
(oc)
DO
(mg/L)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
Turbidity
(NTU)
205
Cond. (uS/cm) pH (pH Units)
TABLE 3
HISTORICAL GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Temperature
(oc)
DO
(mg/L)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
Turbidity
(NTU)
MW-2 10/18/2018 2839.83 2808.94 2.20 2.2
MW-2 4/11/2019 2839.83 2809.27 0.20 0.2
MW-2 10/17/2019 2839.83 2801.55 0.36 0.36
MW-2 4/16/2020 2839.83 2810.59 0.20 0.2
MW-2 10/23/2020 2839.83 2810.07 0.20 0.2
MW-2 4/7/2021 2839.83 39.57 2800.26 872 7.39 20.42 1.40 480.00 1.80 0.63 100 100 0.42 0.7MW-2 10/18/21 2839.83 36.22 2803.61 906 7.08 18.40 2.08 520.00 4.50 0.22 100 100 0.38 0.7MW-2 4/13/22 2839.83 35.00 2804.83 789 6.39 22.61 2.63 23.30 520 2.10 1.10 100 100 0.73 0.7MW-2 10/19/22 2839.83 35.00 2804.83 718 7.36 23.11 5.80 25.70 520 3.90 <0.20 110 110 0.32 0.7MW-2 4/19/23 2839.83 34.12 2805.71 812 6.89 23.40 3.71 13.10 490 2.40 0.75 110 100 0.38 0.6MW-2 10/18/23 2839.83 33.68 2806.15 885 6.81 23.32 2.52 10.00 470 3.70 <0.20 99 95 0.38 0.6MW-2 4/17/24 2839.83 36.32 2803.51 811 7.56 22.89 3.40 4.90 470 2.80 0.36 98 97 0.43 0.6MW-2 10/08/24 2839.83 35.35 2804.48 885 6.43 21.30 2.06 0.30 490 1.30 0.44 98 100 0.37 0.5MW-2 4/23/25 2841.88 35.11 2806.77 781 7.96 23.09 4.07 0.00 500 1.90 0.67 98 100 0.36 0.6MW-2 10/08/25 2841.88 31.13 2810.75 908 6.58 21.35 2.95 1.50 510 2.80 <0.20 96 110 0.32 0.7MW-3 12/18/2010 2846.24 2784.24MW-3 2/23/2011 2846.24 2783.34MW-3 6/9/2011 2846.24 2783.04MW-3 8/22/2011 2846.24 2783.49MW-3 10/24/2011 2846.24 2782.74MW-3 2/23/2012 2846.24 2782.01MW-3 5/17/2012 2846.24 2781.75 MW-3 8/15/2012 2846.24 2781.24
MW-3 11/15/2012 2846.24 2781.14
MW-3 2/13/2013 2846.24 2779.93 0.20 0.20
MW-3 5/16/2013 2846.24 2781.51
MW-3 7/11/2013 2846.24 2784.06 1.40 1.40
MW-3 4/1/2014 2846.24 2789.9 2.80 3.90
MW-3 10/1/2014 2846.24 2793.05 1.60 2.80
MW-3 4/15/2015 2846.24 2793.64 3.90 1.60
MW-3 10/22/2015 2846.24 2796.26 1.40 1.40
MW-3 4/14/2016 2846.24 2796.57 1.50 1.50
MW-3 10/13/2016 2846.24 2798.04 1.20 1.20
MW-3 4/14/2017 2846.24 2798.1 1.50 1.50
MW-3 10/12/2017 2846.24 2787.91 0.92 0.92
MW-3 4/19/2018 2846.24 2798.53 1.00 1.00
MW-3 10/18/2018 2846.24 2799.34 1.20 1.20
MW-3 4/11/2019 2846.24 2799.99 0.62 0.62
MW-3 10/17/2019 2846.24 2800.89 0.51 0.51
MW-3 4/16/2020 2846.24 2800.89 0.29 0.29
MW-3 10/23/2020 2846.24 2801.16 0.20 0.20
MW-3 4/7/2021 2846.24 45.63 2800.61 880 7.54 22.76 2.35 490.00 0.61 0.61 99 120.00 0.28 0.40MW-3 10/18/21 2846.24 46.20 2800.04 880 8.18 20.52 1.91 510.00 0.71 0.71 94 120 0.29 0.50MW-3 4/13/22 2846.24 43.80 2802.44 767 6.32 24.16 6.31 3.20 510 0.47 0.47 100 110 0.26 0.4MW-3 10/19/22 2846.24 45.20 2801.04 745 7.26 24.72 3.90 24.60 500 0.85 0.45 100 110 0.25 0.4MW-3 4/19/23 2846.24 43.60 2802.64 730 6.95 24.32 2.70 24.00 510 <0.40 0.37 110 110 0.27 0.4MW-3 10/18/23 2846.24 43.78 2802.46 877 7.07 26.70 2.60 12.60 490 0.49 0.38 96 100 0.28 0.4MW-3 4/17/24 2846.24 42.25 2803.99 830 7.40 23.15 2.85 0.00 470 <0.40 0.32 98 110 0.27 0.4MW-3 10/08/24 2846.24 41.50 2804.74 890 6.16 22.60 6.00 0.00 500 0.63 0.45 98 110 0.30 0.4MW-3 4/23/25 2848.11 41.36 2806.75 811 6.19 27.61 5.87 0.00 500 0.62 0.31 100 110 0.26 0.4MW-3 10/08/25 2848.11 39.56 2808.55 880 6.85 22.58 2.10 0.00 500 <0.40 0.30 96 100 0.29 0.5
206
Cond. (uS/cm) pH (pH Units)
TABLE 3
HISTORICAL GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Temperature
(oc)
DO
(mg/L)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
Turbidity
(NTU)
MW-4 12/18/2010 2849.28 2783.08MW-4 2/23/2011 2849.28 2783.28MW-4 6/9/2011 2849.28 2782.58MW-4 8/22/2011 2849.28 2782.28MW-4 10/24/2011 2849.28 2781.98MW-4 2/23/2012 2849.28 2781.47 11.00 11.00MW-4 5/17/2012 2849.28 2781.17 12.00 12.00 MW-4 8/15/2012 2849.28 2780.7 15.00 15.00
MW-4 11/15/2012 2849.28 2780.32 21.00 21.00
MW-4 2/13/2013 2849.28 2779.88 28.00 28.00
MW-4 5/16/2013 2849.28 2779.76 20.00 20.00
MW-4 7/11/2013 2849.28 2779.78 8.20 8.20
MW-4 4/1/2014 2849.28 2782.12 6.40 6.50
MW-4 10/1/2014 2849.28 2783.49 5.20 6.40
MW-4 4/15/2015 2849.28 2784.61 6.50 5.20
MW-4 10/22/2015 2849.28 2785.77 4.30 4.30
MW-4 4/14/2016 2849.28 2787.21 4.10 4.10
MW-4 10/13/2016 2849.28 2787.58 3.70 3.70
MW-4 4/14/2017 2849.28 2789.18 4.20 4.20
MW-4 10/12/2017 2849.28 2789.03 3.60 3.60
MW-4 4/19/2018 2849.28 2789.78 3.60 3.60
MW-4 10/18/2018 2849.28 2789.76 3.70 3.70
MW-4 4/11/2019 2849.28 2790.4 3.20 3.20
MW-4 10/17/2019 2849.28 2791.23 3.00 3.00
MW-4 4/16/2020 2849.28 2791.26 2.50 2.50
MW-4 10/23/2020 2849.28 2792.31 2.40 2.40
MW-4 4/07/21 2849.28 56.92 2792.36 892 7.85 22.82 5.16 510.00 3.10 2.40 98 120.00 0.17 0.50MW-4 10/18/21 2849.28 57.00 2792.28 887 9.24 20.53 4.90 520.00 2.50 2.50 92 120 0.17 0.50MW-4 4/13/22 2849.28 51.70 2797.58 753 6.77 22.88 4.80 53.90 500 1.90 1.90 96 110 0.15 0.5MW-4 10/19/22 2849.28 56.64 2792.64 744 6.94 23.94 3.48 26.60 520 2.20 2.10 100 120 0.16 0.5MW-4 4/19/23 2849.28 56.10 2793.18 763 7.13 23.60 4.20 18.60 510 2.20 2.20 110 120 0.18 0.5MW-4 10/18/23 2849.28 55.40 2793.88 803 6.94 25.48 3.41 12.00 500 2.00 2.00 100 110 0.18 0.5MW-4 4/17/24 2849.28 54.47 2794.81 847 7.53 22.47 4.20 15.20 510 2.10 2.00 100 110 0.18 0.5MW-4 10/08/24 2849.28 53.60 2795.68 910 6.19 22.80 3.50 9.20 510 1.70 1.60 100 110 0.17 0.5MW-4 4/23/25 2851.23 - - - - - - - - - - - - - -MW-4 10/08/25 2851.23 52.45 2798.78 925 6.62 22.76 3.56 5.60 520 1.50 1.30 100 100 0.19 0.5MW-5 12/18/2010 2858.89 2782.99MW-5 2/23/2011 2858.89 2783.20MW-5 6/9/2011 2858.89 2782.44MW-5 8/22/2011 2858.89 2782.28MW-5 10/24/2011 2858.89 2782.09MW-5 2/23/2012 2858.89 2781.51 10.00 10.00 MW-5 5/17/2012 2858.89 2781.26 12.00 12.00
MW-5 8/15/2012 2858.89 2780.79 11.00 11.00
MW-5 11/15/2012 2858.89 2780.49 11.00 11.00
MW-5 2/13/2013 2858.89 2779.98 13.00 13.00
MW-5 5/16/2013 2858.89 2779.89 14.00 14.00
MW-5 7/11/2013 2858.89 2780.11 5.20 5.20
MW-5 4/18/2014 2858.89 2787.64 4.50 4.50
MW-5 10/17/2014 2858.89 2789.90 4.30 4.50
MW-5 4/15/2015 2858.89 2786.44 4.50 4.30
MW-5 10/22/2015 2858.89 2789.74 4.00 4.00
207
Cond. (uS/cm) pH (pH Units)
TABLE 3
HISTORICAL GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Temperature
(oc)
DO
(mg/L)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
Turbidity
(NTU)
MW-5 4/14/2016 2858.89 2791.49 4.00 4.00
MW-5 10/13/2016 2858.89 2791.45 3.90 3.90
MW-5 4/14/2017 2858.89 2792.45 3.80 3.80
MW-5 10/12/2017 2858.89 2792.45 3.40 3.40
MW-5 4/19/2018 2858.89 2792.14 3.90 3.90
MW-5 10/18/2018 2858.89 2792.99 4.20 4.20
MW-5 4/11/2019 2858.89 2793.99 3.80 3.80
MW-5 10/17/2019 2858.89 2793.77 3.70 3.70
MW-5 4/16/2020 2858.89 2794.54 3.20 3.20
MW-5 10/23/2020 2858.89 2795.19 3.20 3.20
MW-5 4/07/21 2858.89 63.70 2795.19 812 7.50 23.15 6.37 460.00 3.80 3.80 83 120.0 0.06 0.5MW-5 10/18/21 2858.89 64.32 2794.57 806 9.09 20.64 7.20 460.00 3.80 3.80 78 120 0.051 0.5MW-5 4/13/22 2858.89 63.72 2795.17 702 6.51 24.44 7.31 18.80 470 3.30 3.30 84 110 0.054 0.5MW-5 10/19/22 2858.89 63.94 2794.95 720 7.35 24.22 5.36 26.30 500 3.40 3.30 92 120 0.074 0.6MW-5 4/19/23 2858.89 63.10 2795.79 746 7.01 22.94 4.35 13.20 520 1.90 1.90 110 120 0.16 0.5MW-5 10/18/23 2858.89 62.38 2796.51 769 6.81 26.40 3.51 12.80 480 2.80 2.80 90 110 0.065 0.6MW-5 4/17/24 2858.89 60.72 2798.17 839 7.42 23.25 3.83 1.50 500 1.90 1.80 100 110 0.15 0.5MW-5 10/08/24 2858.89 59.40 2799.49 860 6.20 23.12 5.04 2.50 480 2.40 2.40 97 110 0.085 0.5MW-5 4/23/25 2860.67 59.11 2801.56 857 6.01 22.61 4.91 0.00 490 4.40 2.50 99 120 0.093 0.5MW-5 10/08/25 2860.67 58.52 2802.15 876 6.56 22.40 4.73 5.00 530 2.20 2.10 100 110 0.10 0.6MW-6 12/18/2010 2833.24 2773.94MW-6 2/23/2011 2833.24 2774.09MW-6 6/9/2011 2833.24 2773.34MW-6 8/22/2011 2833.24 2773.43MW-6 10/24/2011 2833.24 2773.14MW-6 2/23/2012 2833.24 2772.47 1.60 1.60MW-6 5/17/2012 2833.24 2772.23 2.60 2.60 MW-6 8/15/2012 2833.24 2771.46 2.70 2.70
MW-6 11/15/2012 2833.24 2771.46 2.90 2.90
MW-6 2/13/2013 2833.24 2770.75 2.50 2.50
MW-6 5/16/2013 2833.24 2772.03 1.90 1.90
MW-6 7/11/2013 2833.24 2774.44 8.20 8.20
MW-6 4/18/2014 2833.24 2780.87 25.00 37.00
MW-6 10/17/2014 2833.24 2783.87 18.00 25.00
MW-6 4/15/2015 2833.24 2784.31 37.00 18.00
MW-6 10/22/2015 2833.24 2785.49 11.00 11.00
MW-6 4/14/2016 2833.24 2783.14 8.80 8.80
MW-6 10/13/2016 2833.24 2787.15 5.30 5.30
MW-6 4/14/2017 2833.24 2785.64 5.70 5.70
MW-6 10/12/2017 2833.24 2787.84 3.80 3.80
MW-6 4/19/2018 2833.24 2787.12 3.10 3.10
MW-6 10/18/2018 2833.24 2789.51 2.00 2.00
MW-6 4/11/2019 2833.24 2790.24 0.76 0.76
MW-6 10/17/2019 2833.24 2790.44 1.20 1.20
MW-6 4/16/2020 2833.24 2790.52 0.42 0.42
MW-6 10/23/2020 2833.24 2789.54 0.85 0.85
MW-6 4/07/21 2833.24 43.22 2790.02 1010 8.12 21.57 2.91 560.00 0.90 0.76 120 130.0 0.37 0.5 MW-6 10/18/21 2833.24 41.63 2791.61 966 7.65 19.54 1.91 550.00 0.63 0.53 110 120.0 0.40 0.6 MW-6 4/13/22 2833.24 42.41 2790.83 791 6.00 23.88 1.91 7.50 520 0.48 0.37 100 100 0.35 0.6MW-6 10/19/22 2833.24 40.40 2792.84 766 7.09 24.55 5.03 15.00 530 0.91 0.70 110 110 0.36 0.6MW-6 4/19/23 2833.24 40.82 2792.42 755 7.08 23.24 4.18 9.30 520 0.51 0.51 110 110 0.38 0.5MW-6 10/18/23 2833.24 38.85 2794.39 900 6.78 24.40 3.20 9.20 500 0.83 0.72 100 100 0.40 0.6
208
Cond. (uS/cm) pH (pH Units)
TABLE 3
HISTORICAL GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Temperature
(oc)
DO
(mg/L)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
Turbidity
(NTU)
MW-6 4/17/24 2833.24 40.20 2793.04 844 7.19 20.11 2.20 6.20 490 0.56 0.56 100 110 0.36 0.6MW-6 10/08/24 2833.24 40.51 2792.73 886 6.69 21.48 2.37 1.30 500 1.30 1.10 97 110 0.39 0.5MW-6 4/23/25 2835.21 40.38 2794.83 811 6.91 19.57 8.08 0.00 510 1.10 0.95 100 110 0.36 0.5MW-6 10/08/25 2835.21 36.90 2798.31 897 7.09 22.12 3.00 4.00 520 0.89 0.74 96 110 0.35 0.6MW-7 2/23/2012 2842.57 2765.54 1.40 1.40MW-7 5/17/2012 2842.57 2765.36 1.30 1.30 MW-7 8/15/2012 2842.57 2765.07 1.20 1.20
MW-7 11/15/2012 2842.57 2764.84 1.10 1.10
MW-7 2/13/2013 2842.57 2764.61 1.30 1.30
MW-7 5/16/2013 2842.57 2765.61 0.88 0.88
MW-7 7/11/2013 2842.57 2765.07 1.00 1.00
MW-7 4/1/2014 2842.57 2772.11 2.60 1.60
MW-7 10/1/2014 2842.57 2773.72 3.20 2.60
MW-7 4/15/2015 2842.57 2766.22 1.60 3.20
MW-7 10/22/2015 2842.57 2776.13 3.20 3.20
MW-7 4/14/2016 2842.57 2776.68 3.30 3.30
MW-7 10/13/2016 2842.57 2778.49 2.50 2.50
MW-7 4/14/2017 2842.57 2778.63 2.10 2.10
MW-7 10/12/2017 2842.57 2780.04 1.60 1.60
MW-7 4/19/2018 2842.57 2779.71 1.70 1.70
MW-7 10/18/2018 2842.57 2781.82 1.50 1.50
MW-7 4/11/2019 2842.57 2782.42 1.10 1.10
MW-7 10/17/2019 2842.57 2782.77 1.10 1.10
MW-7 4/16/2020 2842.57 2783.05 0.74 0.74
MW-7 10/23/2020 2842.57 2782.93 0.86 0.86
MW-7 4/07/21 2842.57 59.21 2783.36 929 7.42 22.37 2.11 520.00 1.00 1.00 100 110.0 0.27 0.4 MW-7 10/18/21 2842.57 58.00 2784.57 909 8.68 19.98 1.41 520.00 1.00 1.00 96 120.0 0.27 0.4 MW-7 4/13/22 2842.57 58.81 2783.76 806 6.42 23.88 2.19 1.60 540 0.87 0.87 100 110 0.25 0.4MW-7 10/19/22 2842.57 56.53 2786.04 781 7.34 24.33 3.20 8.00 540 0.97 0.97 110 110 0.24 0.5MW-7 4/19/23 2842.57 56.57 2786.00 793 6.99 22.60 2.90 9.60 540 1.10 1.10 110 110 0.27 0.4MW-7 10/18/23 2842.57 54.88 2787.69 920 7.32 25.31 2.52 10.50 530 1.00 1.00 110 110 0.28 0.4MW-7 4/17/24 2842.57 54.73 2787.84 908 7.52 20.92 3.04 0.00 520 1.20 1.10 110 110 0.28 0.5MW-7 10/08/24 2842.57 50.23 2792.34 953 6.31 22.80 1.93 2.10 540 1.20 1.00 110 110 0.28 0.4MW-7 4/23/25 2844.93 50.01 2794.92 868 8.06 21.32 5.01 0.00 550 1.30 1.10 110 110 0.28 0.4MW-7 10/08/25 2844.93 51.87 2793.06 971 6.75 22.70 2.37 3.40 540 1.10 1.00 100 100 0.29 0.5MW-8 2/23/2012 2833.60 2771.61 2.30 2.30 MW-8 5/17/2012 2833.60 2771.33 2.10 2.10
MW-8 8/15/2012 2833.60 2770.85 2.20 2.20
MW-8 11/15/2012 2833.60 2770.5 2.40 2.40
MW-8 2/13/2013 2833.60 2769.87 2.30 2.30
MW-8 5/16/2013 2833.60 2770.5 1.30 1.30
MW-8 7/11/2013 2833.60 2772.22 3.00 3.00
MW-8 4/18/2014 2833.60 2777.85 16.00 5.00
MW-8 10/17/2014 2833.60 2780.40 24.00 16.00
MW-8 4/15/2015 2833.60 2781.45 5.00 24.00
MW-8 10/22/2015 2833.60 2782.85 33.00 33.00
MW-8 4/14/2016 2833.60 2781.11 38.00 38.00
MW-8 10/13/2016 2833.60 2784.07 21.00 21.00
MW-8 4/14/2017 2833.60 2783.16 18.00 18.00
MW-8 10/12/2017 2833.60 2785.09 12.00 12.00
MW-8 4/19/2018 2833.60 2784.6 7.10 7.10
209
Cond. (uS/cm) pH (pH Units)
TABLE 3
HISTORICAL GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Temperature
(oc)
DO
(mg/L)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
Turbidity
(NTU)
MW-8 10/18/2018 2833.60 2786.47 4.70 4.70
MW-8 4/11/2019 2833.60 2787.34 2.80 2.80
MW-8 10/17/2019 2833.60 2787.77 2.10 2.10
MW-8 4/16/2020 2833.60 2787.92 1.30 1.30
MW-8 10/23/2020 2833.60 2787.49 1.00 1.00
MW-8 4/07/21 2833.60 45.66 2787.94 1020 8.50 21.92 2.08 580.00 2.10 2.10 120 120.0 0.39 0.5MW-8 10/18/21 2833.60 44.55 2789.05 951 7.36 20.12 1.59 540.00 1.20 1.20 110 120.0 0.41 0.5MW-8 4/13/22 2833.60 45.00 2788.60 849 6.19 24.38 1.99 7.70 560 0.70 0.48 110 110 0.33 0.5MW-8 10/19/22 2833.60 43.43 2790.17 789 7.09 23.44 5.06 14.10 540 0.52 0.39 110 110 0.35 0.5MW-8 4/19/23 2833.60 43.38 2790.22 792 6.88 23.16 4.70 9.90 540 0.68 0.68 120 110 0.40 0.4MW-8 10/18/23 2833.60 41.95 2791.65 924 6.91 24.30 1.98 7.80 500 1.30 1.10 100 100 0.39 0.5MW-8 4/17/24 2833.60 42.65 2790.95 848 7.23 20.29 2.51 19.50 530 1.40 1.30 100 110 0.38 0.5MW-8 10/08/24 2833.60 42.93 2790.67 900 6.31 22.10 1.75 0.00 510 0.83 0.59 100 100 0.37 0.5MW-8 4/23/25 2835.97 42.56 2793.41 827 8.01 20.76 7.17 0.00 500 4.20 0.48 100 110 0.37 0.5MW-8 10/08/25 2835.97 39.90 2796.07 908 6.82 22.30 2.26 0.00 510 <0.40 <0.1 98 100 0.39 0.5MW-9 2/23/2012 2833.22 2751.21 3.70 3.70 MW-9 5/17/2012 2833.22 2751.31 3.50 3.50
MW-9 8/15/2012 2833.22 2751.19 3.20 3.20
MW-9 11/15/2012 2833.22 2750.99 3.30 3.30
MW-9 2/13/2013 2833.22 2750.7 3.10 3.10
MW-9 5/16/2013 2833.22 2750.73 2.80 2.80
MW-9 7/11/2013 2833.22 2750.75 3.00 3.00
MW-9 4/18/2014 2833.22 2752.93 2.90 2.50
MW-9 10/17/2014 2833.22 2754.71 3.20 2.90
MW-9 4/15/2015 2833.22 2756 2.50 3.20
MW-9 10/22/2015 2833.22 2757.28 3.70 3.70
MW-9 4/14/2016 2833.22 2758.05 4.10 4.10
MW-9 10/13/2016 2833.22 2759.12 3.40 3.40
MW-9 4/14/2017 2833.22 2759.92 3.30 3.30
MW-9 10/12/2017 2833.22 2761.02 2.80 2.80
MW-9 4/19/2018 2833.22 2761.51 3.00 3.00
MW-9 10/18/2018 2833.22 2762.64 2.80 2.80
MW-9 4/11/2019 2833.22 2763.72 2.30 2.30
MW-9 10/17/2019 2833.22 2764.24 2.10 2.10
MW-9 4/16/2020 2833.22 2765.02 1.60 1.60
MW-9 10/23/2020 2833.22 2765.49 1.60 1.60
MW-9 4/07/21 2833.22 67.43 2765.79 1020 8.30 22.47 6.95 570.00 1.70 1.70 110 140.0 0.23 0.5 MW-9 10/18/21 2833.22 66.73 2766.49 1000 8.57 20.29 6.20 590.00 1.80 1.80 110 140.0 0.26 0.4 MW-9 4/13/22 2833.22 66.35 2766.87 861 6.43 22.33 6.79 0.00 580 1.30 1.10 110 130 0.24 0.4MW-9 10/19/22 2833.22 65.38 2767.84 808 6.98 23.50 5.10 13.20 590 1.60 1.60 110 130 0.22 0.5MW-9 4/19/23 2833.22 64.68 2768.54 823 6.86 23.10 6.95 8.30 590 1.60 1.60 130 140 0.28 0.4MW-9 10/18/23 2833.22 63.96 2769.26 947 6.76 24.76 4.18 6.90 580 1.30 1.30 110 120 0.29 0.4MW-9 4/17/24 2833.22 63.17 2770.05 931 7.41 20.48 4.73 3.70 580 1.50 1.30 110 130 0.29 0.5MW-9 10/08/24 2833.22 62.38 2770.84 997 6.45 22.36 7.66 0.00 580 1.60 1.30 110 130 0.27 0.4MW-9 4/23/25 2835.60 52.08 2783.52 840 7.61 20.97 7.01 0.00 570 1.40 1.20 110 130 0.28 0.5MW-9 10/08/25 2835.60 60.88 2774.72 1000 6.70 22.80 5.80 1.90 570 1.30 1.10 110 120 0.28 0.5 MW-10 2/23/2012 2850.75 2773.95 2.80 2.80
MW-10 5/17/2012 2850.75 2774.01 2.60 2.60
MW-10 8/15/2012 2850.75 2773.77 2.70 2.70
MW-10 11/15/2012 2850.75 2773.75 3.20 3.20
MW-10 2/13/2013 2850.75 2773.32 3.50 3.50
210
Cond. (uS/cm) pH (pH Units)
TABLE 3
HISTORICAL GROUNDWATER QUALITY ANALYSIS
Adelanto Wastewater Treatment Plant
Adelanto, California
Sample ID Sample Date SWE (ft msl)
FIELD MEASUREMENTS LABORATORY ANALYSES
DTW
(ft)
E-Water
(ft msl)
Chloride
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Fluoride
(mg/L)
Temperature
(oc)
DO
(mg/L)
TDS
(mg/L)
Total
Nitrogen
(mg/L)
Nitrate as
Nitrogen
(mg/L)
Turbidity
(NTU)
MW-10 5/16/2013 2850.75 2775.25 3.60 3.60
MW-10 7/11/2013 2850.75 2777.57 4.80 4.80
MW-10 4/18/2014 2850.75 2784.96 4.00 4.90
MW-10 4/17/2014 2850.75 2785.83 3.10 4.00
MW-10 4/15/2015 2850.75 2787.92 4.90 3.10
MW-10 10/22/2015 2850.75 2788.33 1.70 1.70
MW-10 4/14/2016 2850.75 2790.71 1.30 1.30
MW-10 10/13/2016 2850.75 2790.41 1.00 1.00
MW-10 4/14/2017 2850.75 2791.40 1.20 1.20
MW-10 10/12/2017 2850.75 2792.55 1.20 1.20
MW-10 4/19/2018 2850.75 2791.57 1.50 1.50
MW-10 10/18/2018 2850.75 2792.93 1.50 1.50
MW-10 4/11/2019 2850.75 2793.42 1.10 1.10
MW-10 10/17/2019 2850.75 2794.16 1.80 1.80
MW-10 4/16/2020 2850.75 2794.01 1.40 1.40
MW-10 10/23/2020 2850.75 2794.45 1.30 1.30
MW-10 4/07/21 2850.75 55.60 2795.15 979 7.80 20.97 1.87 530.00 1.50 1.40 110 110.0 0.35 0.4MW-10 10/18/21 2850.75 56.04 2794.71 943 8.66 19.14 1.93 570.00 2.00 2.00 100 120.0 0.33 0.4MW-10 4/13/22 2850.75 55.93 2794.82 784 6.47 22.72 4.00 3.60 520 <1.6 1.50 110 110 0.18 0.4 MW-10 10/19/22 2850.75 54.86 2795.89 753 6.98 24.33 3.85 16.20 540 1.70 1.70 110 110 0.21 0.5MW-10 4/19/23 2850.75 54.05 2796.70 750 6.94 23.00 4.32 10.00 1900 1.90 1.90 110 110 0.18 0.4MW-10 10/18/23 2850.75 53.05 2797.70 881 7.09 25.20 3.28 6.10 520 1.90 1.90 100 110 0.18 0.4MW-10 4/17/24 2850.75 51.05 2799.70 882 7.40 21.19 5.72 5.60 540 1.80 1.60 110 110 0.33 0.5MW-10 10/08/24 2850.75 49.88 2800.87 910 6.32 22.08 4.25 1.60 530 2.00 2.00 110 110 0.17 0.4MW-10 4/23/25 2853.14 48.61 2804.53 863 7.12 20.96 7.12 0.00 530 1.40 1.40 100 110 0.30 0.4MW-10 10/08/25 2853.14 49.15 2803.99 933 6.72 22.76 4.42 2.30 520 1.30 1.20 100 100 0.22 0.4 SWE TDSDTW ftE-Water ft msl- Chemical std units
NS mg/lN/A J+ NTU
Total Dissolved SolidsFeetFeet Mean Sea LevelStandard pH unitsMilligram per liter or parts per millionResult is above the MDL, but below the PQL; Value is approximate Survey Well Elevation
Notes:
Depth to WaterElevation of WaterNo MCL or California Secondary MCL for Drinking WaterNot Available / Not Accessible / No Sample CollectedRe-sampled on alternate date due to lab holding time expiration for sample 10/18/2021. Nephelometric Turbity Unit
211
APPENDIX A
212
ATLAS ENVIRONMENTAL
ENGINEERINC. INC.
5122 BOLSA AVENUE, SUITE 107
HUNTINGTON BEACH, CA 92649
(714) 890 - 7:19
PROJECT STATUS REPORT
Adelanto Waste Water Treatment Plant
(AWWTP)
19101 Jonathan Street
Adelanto, California 92301
AEEI JOB NO
DATE:
ATER MONITORING WELLS
SEMI-ANNUAL sLrGnT
123? Itt014 t04 3o 4.00 2846.80 C f tavMW-2 a.t\ ll to4, ltt .?.t 2.00 90-102 2841.88 1 cltarl MW-3 )s-Er 10,60 tt{}o 90-102 2848.11 \ Ll I c,,./ st.\r lo,@' 1q.+{ 2.00
2.00 61-101 2851.23 I elp aV
MW.5 5&61 tq00 o il).la 2.00 69-'114 2860.67 {
)69v t l\oco 8{.r{ 40-89.5 2835.21 x
Q
o
dL/
AI ,(l ll,oa- t0 ?.41 4.00
2.00 75-105 2844.93 ( qlratL
t?.1o 14ooo 4f "si 4.00 55-85 2835.97 I aluhirw-9 6o.at l0,too lob.b, 74-104 2835.60 { Cla atMW.1O 14.v lop oa to).9 ,4.00
| 4.00 70-100 2853.14 ,( Q leqJ,--
EXPLANATION
REMARKS
All purg€d w3ler was dls harged on lhe ground next io the well.
L. ENTERED BY:
/00,0t o ',r GROUNDWATER REMOVED:
DATA RECORDED BY:
DTW
IOIAT ,
WEI.L IE (r€e{) PI,RCEO . . :DTB . DIA, ODORS
,"ltl
Oct25
2025
€-wA,
(ftmsD
Scr€erj
lnt€rYal
Feet (eet)
Cblot
80-100
l
l
DI}i i:9E?lt1:T9!YArEq FBOMSIRqTF.:DfPrfl :ro FROoiJoI fAotir. SPAiAGE ' : :' '
rrqlgumPllsilN FqEr :,:: ::rurP:;::qPilr ro Egrrorr::
: l: :: :: :,i,I , :,: ,,
cD, tllt l c9EsglP DTr116w,^G8:ioF,edq$NoEoF'iBE8lopr.,cl{r$rrrc sPEcqc!,?Avrryoq qrFq} SWE |.SIfiVEYED.WEIL HE,ID ELE\i E1!Af:] ETEVATION:OF I,fATER:::: :: : ]: . . . ] ,, PT.,PRodUCr THtct<}rESS
QtAII'IEII 'OJA}TETER
NA , Ndl AVA!6BF
F/P . FREE PX@UCT
213
FIELD DATA - LOW FLOW GROUNDWATER SAMPI-ING PROGRAM
Adelanto Waste Water Treatment Plant
1910l Jonathan Street, Adelanto, CA 92301
2025
VC
/vl
o o -D
/o e
L):
Zv Low Flow Purge
vh^
WATER COI.OR:
SITE:
ADDRESS:
PERSONNEL:
DATE:
WEATHER:
DTw W/PUMP in werr, ?? ,1 yWELL I.D.:
rNrTlAr. olw (ft):
Dr8 (ft):
PURGE METHOD:
EQUIPMENT:
PUMP INTAKE DEPTH (ft):
TOTAT VOLUME PURGED (
TIM E DTW Pump Dial Purge Rate Volume Purged Tem p Conductivity pH ORP DO Turbidity (mt) (ft) Setting (ml/min) (mL) fc) (uS/cm) (pH Units) (mv) (mslt) (NIU) v?.br fot {0 r2 5(o '. 8:o€ ZZ,ls 8?r 6.3e 7z- o
rl) I \ I
lP p.> h)tr 87t 5.\ z_ 7a 14.Li h o
E: t{ )6-ou u.\b 9or- (.q 1 rI t4.3f o
\ I /PP a-o ?z .fo oto ( 6.Vq b ) \,r (:z\ ( \)
Comments
IIIIII
III
III
,,
I
--tuz6
tt =I =
I
t tt tl
I =
tt+
=
I I
214
FIEI,D DATA - I.OW FTOW GROUNDWATER SAMPI.ING PROGRAM
Adelanto Waste Water Treatment Plant lo
19101Jonathan Stre€t, Adelanto, CA 92301
2025
VC
Y
o
.a
PURGED (mL):
e le-a t
ta_
MW. IDTW WPUMP iN WEII
EPTH (ft):
PURGE METHOD: Low Flow P
DATE:
WEATHER:
SITE:
ADDRESS:
PERSONNET:
WELL I.D.:
rNrTrAr. DTW (ft):
orB (ft):
EQUIPMENT:
PUMP INTAKE O
TOTAI- VOLUME
WATER COLOR:
TIME DTW Pump Dial Purge Rate volume Purged Temp Conductivity pH ORP DO Turbidlty Setting (ml/min) (mL) fc) (mt) (ft) (uS/cm) (pH Units) (mv) (mg/L) (NTU} bt u5 70't. f O'o '5v b 7.to lLo h.if trZ '7. ?:10 )- /.x7-.\{ \ I I SO,rc,.- ?r. po 1.t{ 66n 9o 3,6L /.& -l CrA'o ZoZ\ 1rz- €.s q a:t^ o, )t 7.oo /.t
'1: q{ [,r l I /aog2 \.7( 1( 2,9-( t.(
Comments
rII Jt&l I
II
II
II I
I tod
I tt t
F
=
r
=
=
tt
215
FIELO DATA - I-OW FI-OW GROUNDWATER SAMPI-ING PROGRAM
Adelanto Waste Water Treatment Plant 202s
19101Jonathan Stre€t, Adelanto, CA 92301 6Urv^"J
Low Flow Pu r.N.!
lOt oo o
\ot . r z--
vc
/0
LJ
DTW WPUMP in well
PUMP INTAKE DEPTH (ft): ,q. rL tts'h
DATE:
WEATHER:
SITE:
ADDRESS:
PERSONNEL:
wEt-L t.D.:
rNrTrAr Drw (ft)
DrB (ft): TOTAT VOI-UME PURGEO (rnL):
WATERCOLOR: .IqC. ZL
PURGE METHOD:
EQUIPMENT:
TIME DTW Pump Dial Purge Rate Volume Purged Temp Conductivity pH ORP oo Turbidity (mt) (ft) Setting (ml/min) (mt) fc) (u5/cm) (pH Units) (mv) (mg/l-) (NTU) s:E( tot-+r 5-. ) spo 60o ZJ.lo 6.88 /zo d.8L o
J .lI I \ fop r ? t.4L 873 6.8 L /t9 {.qv p
S: S{ JIO,. ?2.(5 6?L 6. 8r llo f,." c o
) (oooc z?.5N (tu (t.8r 6:oo I
,l l"K S. to @
r
Comment5
rII
III II
-ke
tl
I
=
t r-I-F
ttt # H tl fT t
f---r----
I tt I
l-----T---- ------ l
216
Adelanto Waste Water Treatment Plant
19101lonathan Street, Adelanto, CA 92301
O\)
Z.( o
lo 202s
VC
\
o
qr
?-V
PURGE METHOD: l-ow Flow Purge
DTW WPUMP in Well: WATER COLOR: e
DATE:
WEATHER:
SITE:
ADDRESS:
PERSONNEL:
EqUIPMENT:
PUMP INTAKE
TOTAL VOLUM
DEPTH (ft):
E PURGED (
WELL I.D.:
rNrrA[ Drw (ft]:
DrB (ft):
TIME DTW Pump Dial Purge Rate Volume Purged Temp Conductivity pH ORP DO Turbidity (ft) Setting (mUmin) (mt) (mt) fc) (uS/cm) (pH Units) (mv) (mglt-) (NTU} /o: af s2.13 8P'r, (oo 'lEop 23.tr 1t' 6.s8 qr- tr. tp 7.L I I 5) o,o Z7.qG q28 6.62 /o'. \o I
.11 V.(z- J.t
lo l \l' ?fo,o at44 12L 6.oz loL ).7 0 $.)
/o.- s, )I I o oscr 2? 7b q.f €.cL IPL a. 5t J.C- \, \ I Comments:
III
II
rt \ro,
FIELD DATA - I-OW FI"OW GROUNDWATER SAMPLING PROGRAM
=
---+-
I H
tl I +- [--r----- f- t I tt tl I
tt
217
FIELD DATA . LOW FI.OW GROUNDWATER SAMPLING PROGRAM
Adelanto Waste Water Treatment Plant /a
19101Jonathan Street, Adelanto, CA 92301
202s
VC
mL): o
L cn
Low Flow Purge
DTw VPUMP in Well
OATE:
WEATHER:
SITE:
ADDRESST
PERSONNEI.:
WELL I.D.:
rNrTrAr Drw (ft):
DrB (ft): lll.to
PURGE METHOD
EQUIPMENT:
PUMP INTAKE DEPTH (ft}:
TOTAL VOTUME PURGED --w WATER COLOR:
TIME DTW Pump Dial Purge Rate Volume Purged Temp Conductivity pH DO Turbidity (ft) Setting {ml/min} (mL) fc) (mt) (us/cm) (pH Units) (mv) (mclL) (NTU) il.o+ d3.+q- { o'r. s?o 14bo ?2,+L &() 6.sL lLo Lr.(r 5.4 lt,. l2-- I $o o,a Zz.s) (6o 6. sq ttb q.8s 6 /o
I It.lT -7tb- zz,vY- Ktt G.si t l1- 14 &o J,3
r.t'"2h-/ ,lI V u I os oo 'zz.\o [.1b 6.Sb /)o t4 .)\ S.o Comments:
III
III III III
IT
I
I
QJ 1t11t-t -
<t
/Yl\^, -f ----78:€-
ORP
l
tt
m tt
ttl r---r---
I
II
I
218
Adelanto Waste Water Treatment Plant 2025
19101Jonathan Street, Adelanto, CA 92301
o aro
lv
vc
I
DTW WPUMP iN WEII:
DATE:
WEATHER:
SITE:
ADDRESS:
PERSONNEL:
TOTAL vOLUME PURGED (mL):
wArER COLOR: e- \t CtfCWELL I.D.:
rNrTrAr. DTW (ft):
DrB (ft):
PURGE METHOD:
EQUTPMENT: I LV
TIME DTW Pump Dial Purge Rate volume Purged Temp Conductivity pH ORP DO Turbidity SettinS (ml/min) (mL) (mt) (ft) fc) (us/cm) (pH Units) (mv) (mclt) (NTU) 6: fL 74.tf 5o) fot 1t5b o u.5z 88o 7.t8 l7h 1.!d ,.8
I I Soo G: ST t
'o Zz.)o {? z- 7.og l>b l.zo h.c
7: oZ- 7{oo zz .ra1 1t- 7.o8 to5- ).o9 7.9
\t
',1, { loFpo Z2.lz/. {1+ a-o 7 l?-9 2,o.3 h.b '7: oT
Comments
III
II II
PUMP INTAKE DEPT{ 1*1: /
FIELD DATA - I-OW FLOW GROUNDWATER SAMPTING PROGRAM
Low Flow Purge
A-.r-,O-,O-1--- c Af
I
=
=
t--__-l t T+
=
I
=
=
--- T- tt
219
fIEtD DATA - tOW FI.OW GROUNDWATER SAMPTING PROGRAM
Adelanto Waste Water Treatment Plant /o
19101Jonathan Street, Adelanto, CA 92301
| 01so o
202s
VC
+
Low Flow Purge
u h,\
DTW WPUMP in well
PUMP INTAKE DEPTH (ft);
Zv
DATE:
WEATHER:
SITE:
ADDRESS:
PERSONNEL:
TOTAT VOLUME PURGED ImL):
wArER coloR: clQ arr
WELL I.D.:
lNlTlAl" DTw (ft)l
DrB (ft):
PURGE METHOO:
EQUIPMENT:
TIME DTW Pump Dial Purge Rate Volume Purged Temp Conductivity pH ORP DO Turbidity (mt) (tt) SettinS (mllminl (mt) fc) (us/cm) (pH Units) (mv) (mg/t) (NTU) fZ.ro o I 1:28 .fbF 1,fb a ?z.q{ 'T *r f .8t ILS_ z.6g 7.A I I I Sop (2 c1?) 4:51 6. Vr" t)? z. b.b k.z
ot:5I 1f".o ?2.>\. n?q G.1e t-)t ?.\f 3.,{
!
I
I 4t\\ (Q.ca-o zz.w q+i G-?f /\o 2,j?- 3.v
Comments
TIIIII
III
III
rII
?2.8,
II
ttt
I
=
r tt -----r---t
=
ttl
220
fIELD DATA . I.OW TLOW GROUNDWATER SAMPLING PROGRAM
Adelanto Waste Water T.eatment Plant
19101Jqnathan Street, Ad€lanto, CA 92301
l0,oO o
0 2025
vc
4 3 !2
L
DTW wPUMP in Well:
PUMP INTAKE DEPTH (ft):
EQUIPMENT:
PURGE METHOD: Low Flow
SITE;
ADDRESS:
PERSONNELT
OATE:
WEATHER:
TOTAI, VO|UME PURGEo (mL):
warER coLoR: gl g^,^a
WELL I.D.:
rNrTrAr Drw (ft):
DrB (ft):
TIME DTW Pump Dial Purge Rate volume Purged Temp Conductivity pH ORP oo Turbidity (mt) (ft) Setting (ml/min) (mL) fc) (u5/cm) (pH Units) (mv) {melt-) {NTU) \o.o; 5"'t. 5o.,o ^€o 'o G: r{ L7.88 q5- 6.8r )?^ L.8> p Q"to I I 5bo,o 4.5,o 1tl. Q.Bt lzr 2.59 o
Q:t(- \ *Ibo a.rY Q t>- e .8t l7L L.l? c
G:1,o I
I I lpo D LZ.\A 4o{ a.g> rzf z,zlo t2
Comments
II II I
F co r,r<I
'q-I
I
I ttt r---t----- [---r---- I rl r F
E#
ffi =
[-----T-----
t I m H
fT t
I
=
221
FIETD OATA - LOW FI-OW GROUNDWATER SAMPLING PROGRAM
Adelanto waste Water Treatment Plant lo
19101Jonathan Street, Adelanto, CA 92301
2025
vc
DTW WPUMP iN WEII:
DATE:
WEATHER:
SITE:
ADDRESS:
PERSONNET:
PURGE METHOD: Low tlow Purge
EQUTPMENT: /A. n Tur-p-FtolUf,>
PUMP INTAKE DEPTH (ft):
TOTAI VOLUME PURGED (mL): lO, OOO
WATER coLOR: C-ll a rt
WELL I.D.:
rNrTrAL DTW (ft):
DTB (ft):
TIME oTw Pump Dial Purge Rate vglume Purged T€mp Conductivity pH ORP DO Turbidity S€ttin8 (ml/min) {mt) fc) (us/cm) (pH Units) (mv) (melr) (NTU) {mt) (ft) 6l.z,o i7 5a'o ?fb-o Zi)r st, 6.8L la f- 8: r- ,.{L 2.L I's(- 5op,o tZ.7E- 91r G.5I tl Lt J- 1< z.o ? 500 22.86 1'.,o rr> /eo,,o 4.$E /r\ t.8, /.4
I
{/ 4'.o{ /O Pco /Ooa Q ,7-,a ltt J .80 t- al
Comments:
IITIII
IIr,I zz.6o
I
--_l
f-----r----
F
I
=
m
=
=
ttl
222
FIELD DATA. LOW FI.OW GROUNDWATER SAMPI.ING PROGRAM
Adelanto Waste Water Treatment Plant
19l0l Jonathan Street, Adelanto, CA 92301
Low Flow Purge thw. lo
/o 2025
vc
o
DTW W/PUMP in Well: o
PUMP INTAKE DEPTH (ft):
Lv
DATE:
WEATHER:
SITE:
ADDRESS:
PERSONNEL
WELL I.D.:
rNrTrAL Drw (ft):
DrB (ft):
PURGE METHOD:
EQUIPMENT:
TOTAL vOLUME PURGED (mll:
wArER cor.oR: g leUV
TIME DTW Pump Dial Purge Rate volume Purged Temp Conductivity pH ORP oo Turbidity {mt) (ft) Setting (ml/min) (mL) fc) (uS/tm) (pH Units) (mv) {me/L) (NTU) /o:o{ \q,7f f,o,o Ls-o o zl. tr 4ttr 5.+t l$7 9.7r 2 I
'l lo'.t,o 'l St2 o .) 2t '(o 13 r- G.? 2- l6r (t,sg t.9 to..t{ 75b .o zt.tz 4 Vz- a.7, /bv Ll.so 7.e lo'.2o I/ t .JI I o o'o z?,?L q-5 7 G.+ z- tr( tr ?t Z. -2 Comments:
III
a
rI ITI
lot aao
o).
F tt I
lttt
m =
tt
tl I
=
I
T T
tt
223
Site Description
The subject site is located in the northern portion of the City of Adelanto, approximately 2,500 feet east of US Highway 395, northeast of the intersection of Auburn Avenue and Jonathan Street, in the County of San Bernardino. A site vicinity map is included as Figure 1. The Southern California Logistics Airport (former George Air Force Base) lies approximately, 0.5 miles due east of the site. The site lies at an elevation of approximately 2,842 feet above mean sea level. With the exception of the Shadow Mountain area north of Adelanto, topography across the area is relatively flat and featureless, sloping gently towards the north-northeast at an average gradient of approximately 25 feet per mile. The only surface water drainage of any observable significance is close proximity to the site is a desert wash that extends in a northwestsoutheast manner about 2,000 feet due west and 3,000 feet due south of the site. This drainage joins Fremont Wash approximately 3.5 miles northwest of the site, and from there finds confluence with the Mojave River near the own of Helendale, approximately 11 miles northeast of the site.
The facility began treating wastewater in 1998 with an initial design capacity of 1.5 MGD. Treated effluent is discharged into a series of excavated percolation ponds along the northern and central portions of the site. Since 1998, the amount of effluent required to be handled by the facility has risen significantly. Recent improvements to the facility have resulted in the significant increase in plant capacity to 3.0 MGD, and as of March 2013, the WWTP no longer bypasses excess wastewater to the Victor Valley Wastewater Reclamation Authority (VVWRA) treatment plant, but handles, treats, and disposes of all waste it receives onsite.
The facility includes ten (10) groundwater monitoring wells (MW-1A, MW-2 through MW-10) that are used to monitor groundwater conditions surrounding the facility.
Groundwater monitoring well locations are depicted on Figure 2.
Well installation activities were conducted in 1998 for wells MW-2 and MW-3, 2011 for wells MW-7, MW-8, and MW-9. Due to the extended screen length in existing well MW1, well MW-1A was installed as a replacement well for well MW-1 to provide a shallower screen depth that were more consistent with wells MW-2 through MW-10.
Current semi-annual groundwater monitoring and sampling only includes wells MW-1A, MW-2 through MW-10. The wells are sampled every April and October as outlined in the WDR permit. A summary of the completion detail is included as Table 1. 224
Geologic and Hydrogeologic Settings
The subject site is located in the high desert region of the Mojave Desert of southern California. The area is situated on a broad erosional plain of coalescing alluvial fans.
Geologic units Characteristic of alluvial fans include interbedded deposits of clastic sediments and eroded debris laid down in high energy fluvial systems such as braided stream channels and flood events typical of desert environments. Subsurface materials included interbedded layers of sands, silts, gravels and cobbles, and other varying mixtures. Clay layers, calcareous soils (cacliche), and evaporite deposits can occur but are generally of limited thickness and areal extent.
The subject site is part of the Mojave River Valley Groundwater Basin (which includes upper, middle and lower sub-basins), and are managed by the Mojave Water Agency.
Regional groundwater flow direction are to the north-northeast toward the Mojave River.
According to the California Department of Water Resources, there are two distinct waterbearing units present in the area of the subject site1 . The first is described as a Pleistocene
and younger floodplain unit (called the “Floodplain Unit”) that extends 50 to 200 feet deep in the Basin. The other is described as a Pliocene and younger fan unit (called the “Fan Unit”) that includes unconsolidated to partially consolidated alluvial fan deposits up to 1,000 feet thick. The available geologic information suggests that the site is primarily underlain by the Fan Unit.
1 California’s Groundwater, California Department of Water Resources Bulletin 118, update 2/27/2004, Upper Mojave River Valley Groundwater Basin.
225
APPENDIX B
226
PROCEDURE FOR LOW-FLOW (MINIMAL DRAWDOWN) PURGING AND SAMPLING Introduction
The Low-Flow purging and sampling technique is the preferred procedure for groundwater sampling under a wide range of hydrogeologic settings. The objective of low-flow/minimal drawdown purging is to obtain a sample that is most representative of the ambient groundwater conditions near the well, taking into consideration aquifer heterogeneities and site-specific subsurface conditions, without imparting bias due to excessive pump rates or formation stress.
The Low-Flow method of purging and sampling involves using a pump to purge water at a constant low rate to achieve field parameter stabilization, while minimizing stress on the aquifer. This method has been well documented as a preferred methodology for collecting representative samples from groundwater (Low-Flow (Minimal Drawdown), Ground-Water Sampling Procedures, Puls and Barcelona, USEPA, April 1996). LowFlow purging is considered by leading researchers as superior to bailing and high-rate pumping and results in a more representative sample than the typical “three volume” well purge methodology or well evacuation.
This procedure is accomplished by measuring field parameters at periodic intervals during purging with a flow cell container. The flow cell is an inline purge cell, which will allow the sample technician to constantly monitor field water quality parameters such as temperature, pH, dissolved oxygen, and conductivity. Other techniques or containers can be used to collect samples for periodic measurements, provided that periodic and representative samples can be collected.
The following sections provide a general discussion on each aspect of the Low-Flow procedure with bulleted items being procedural steps.
Equipment
Dedicated pumps are ideal for low flow purging. Sites that have observation wells without dedicated pumps will require the use of portable (non-dedicated) pumps (bailers cannot to be used for low-flow purging). The sampling team should have all equipment necessary for purging and sampling wells at low flow rates. Other equipment may include:
o Water Level Tape or other water level measuring device; o Flow cell to monitor field parameters;
o Calibrated purge water container;
o Dedicated pump system or disposable sample tubing (for non-dedicated pumps); and
o Field Meters for pH, Temperature, Dissolved Oxygen, and Conductivity/Specific Conductance.
Prior to each sampling event the field probes will be calibrated in accordance with the owner’s manual provided and the site-specific sampling plan. Field probes should be checked for drift every four hours or at the end of the day at a minimum. 227
PROCEDURE FOR LOW-FLOW (MINIMAL DRAWDOWN) PURGE AND SAMPLING 1 It is important to identify the range, resolution and accuracy of the instruments used to determine if the selected stabilization criteria can be measured. If the instruments available cannot accurately measure the stabilization criteria above, consult with the regulatory program manager to determine if different criteria values would be appropriate for your sampling program.
Decontamination
Sites that have observation wells without dedicated pumps will require the use of nondedicated pumps. All non-dedicated equipment used during the purging and sampling process must be decontaminated prior to each use, including tubing, unless it is disposable):
o Downhole equipment, such as a water level indicator, is to be triple-rinsed between well locations.
o Discard disposable polyethylene tubing used with non dedicated pumps after use at each well.
Sample bottles will be provided and properly prepared by the analytical laboratory scheduled to perform the analysis. No cleaning or preparation of sampling bottles by field personal will be performed.
Purge Volumes and Monitoring Frequency
Low-flow purging does not require the calculation of the water volume in the well, since purging is based solely on indicator parameter stabilization. Rather, the volume of the pump and discharge tubing are necessary for making calculations needed to determine field measurement frequency and/or the minimum purge (“passive”) sampling system purge volume. Pump chamber or bladder volumes can be obtained from the manufacturer. Volumes of the sample tubing can be calculated or taken from the table below.
Discharge Tubing Volumes
Tubing Diameter Volume/foot
1/2" OD/3/8” ID 20 ml
3/8” OD/1/4” ID 10 ml
1/4" OD/1/8” ID 5 ml
Well casing volumes should only be calculated if required by Permit or State Regulation and recorded on field information forms. In addition, well casing volumes may be needed in any case where parameter stabilization is not achieved after a three-casingvolume purge (see below).
Sampling equipment volumes are calculated or recorded for use in determining the frequency of field measurements. Depending on the equipment configuration, calculate and record the volume of the pump and sample tubing using the methodology described 228
PROCEDURE FOR LOW-FLOW (MINIMAL DRAWDOWN) PURGE AND SAMPLING 2 above (the volumes are typically converted to liters). The frequency of field readings is based on the time required to purge at least one volume of the pump and tubing system. For example, a pump and tubing volume of 500-ml purged at a rate of 250 ml/minute will be purged in two minutes; readings should be at least two minutes apart.
In any case, it is important to ensure that the field parameters are measured on independent samples of water.
Purge Rates
The objective of the purging process is to remove sufficient water from within the well screen zone to result in a sample that is representative of actual aquifer conditions adjacent to the well. The sampling pump or pump intake should be located within the well screen. This pump location is already established for dedicated pumps. For nondedicated pumps, the intake is placed within the screened interval, typically in the center of the screen. If the water column in the screen is shorter than the overall screen length, the pump should be placed lower in the screen but no lower than about 6-12 inches from the bottom of the screen to avoid picking up any settled solids in the well.
A low pumping rate (typically less than 1,000 ml/min) is used to minimize drawdown within the well and formation and mobilization of formation solids. Lower flow rates may be required during sampling. Flow rate is determined by measuring the time it takes to fill a calibrated container, or by measuring the volume of one pump discharge cycle and multiplying this volume by the number of cycles per minute (e.g., 125 ml/cycle x 4 CPM = 500 ml/min). Drawdown is monitored by measuring the water level below the top of the well casing with a water level indicator or similar device (e.g. transducer) while pumping. Drawdown will be stabilized during purging. Flow rates and drawdown are recorded on a field log, field data form or with a data logger. o Measure water levels prior to initiating purging;
o Calculate well volumes, if required by permit;
o Calculate sampling system volume and determine indicator parameter measurement frequency;
o Lower water level meter probe to 1-2 feet below static water level; o Connect the flow cell to the discharge tube from the pump; o Begin purge at a rate of 100-200 ml/min (or at a rate determined from prior events);
o Check drawdown with a water level tape while pumping; o If drawdown stabilizes quickly, increase the pumping rate in increments of 100 ml/min until drawdown increases, then reduce the rate slightly after a few minutes to achieve a stable pumping water level;
o If the water level continues to drop, reduce purge rate by 100 ml/min increments until the water level stabilizes;
o Once water level stabilization is achieved, proceed to indicator parameter stabilization.
229
PROCEDURE FOR LOW-FLOW (MINIMAL DRAWDOWN) PURGE AND SAMPLING 3 Parameter Stabilization
Parameter stabilization ensures that the well is adequately purged and sampled groundwater is representative of formation water. In order to determine when a well has been adequately purged, samplers should:
o Monitor pH, specific conductance, and dissolved oxygen of the ground water removed during purging;
o Observe and record the water level drawdown; and
o Record the purge rate and note the volume of water removed if required by guidance or permit.
A well is adequately purged when the pH, specific conductance, and dissolved oxygen stabilize. Stabilization occurs as follows:
pH: +/- 0.2 pH units
Conductance: +/- 5 % of reading value
Dissolved oxygen: +/- 10.0% or 0.2 mg/L, whichever is greater.
Temperature is not a reliable indicator of stabilization, being affected by ambient temperature at the well head, sunlight, and some sampling devices such as electric pumps. Temperature is typically measured to provide correction for temperature dependent parameters (e.g., DO % saturation, pH, and specific conductance).
While turbidity is not a direct measurement of water chemistry and is not used as an indicator parameter of stabilization, it is useful to support data from metals analyses. To avoid artifacts in sample analysis, turbidity should be as low as possible when samples are taken. Turbidity should be measured at least three times, once when purging is initiated, again after the water level in the well stabilizes, and again when the water chemistry indicator parameters being measured are stable. Turbidity should also be measured any time the pumping rate is increased or the water level in the well drops noticeably. If the initial turbidity reading is high (>50 NTU) and the second reading is not significantly lower, the pump rate should be reduced. The turbidity value measured prior to sampling will be recorded. If this value exceeds 50 NTU, procedures should be reviewed and the source of the elevated turbidity determined.
Sampling
Wells should be sampled immediately upon completion of purging operations. Once the water level stabilizes, the purge rate should remain constant during low-flow sampling (generally less than 500 ml/min). For VOCs, lower sampling rates (100 - 200 milliliters/minute) may be required.
o Record field parameters prior to sampling;
o Record depth to water levels prior to sampling (note if the well has not stabilized). 230
PROCEDURE FOR LOW-FLOW (MINIMAL DRAWDOWN) PURGE AND SAMPLING 4 o Record the flow rate determined using a calibrated measuring device; o Disconnect the flow cell other equipment from the pump discharge tube; o Collect samples from the pump discharge tube
o Collect large volume samples first (e.g.,1 liter bottles), then VOC samples, and any filtered samples last;
If, after three well volumes have been removed, the chemical parameters have not stabilized according to the above criteria, the sampling team may elect to collect a sample. The conditions of sampling should be noted in the field log or field information form.
Low Yield Formations
In some situations, even with very slow purge rates, the well drawdown may not stabilize. In this case, sampling the water within the well screen zone provides the best opportunity to determine the formation water chemistry, as well evacuation can greatly affect sample chemistry through changes in dissolved gas levels, dissolved metals and VOCs.
Attempts should be made to avoid purging wells to dryness. This can usually be accomplished by slowing the purge rate. If the well is evacuated during the purging procedures shown above, the sample may be collected as soon as a sufficient volume of water has recovered in the well. If the well goes dry repeatedly (i.e. over multiple monitoring events) prior to sampling, then a minimum purge or “passive” sampling approach should be used in lieu of well evacuation.
Minimum Purge (“Passive”) Sampling
For wells that cannot achieve a stabilized water level and purge dry even at very low pumping rates, an alternative to the traditional evacuation approach is to use minimum purge (sometimes called “passive”) sampling techniques to avoid the pitfalls of well evacuation and obtain a better estimation of the formation water quality. Sampling the water present in the screen zone provides the greatest chance of obtaining samples with minimal alteration of the chemistry. Although the low movement rate of the ground water in the screen provides only a limited exchange, avoiding the alteration caused by the factors mentioned above is really the best alternative.
The minimum purge approach requires the removal of the smallest possible purge volume prior to sampling, generally limited to the volume of the sampling system. The sampling system volume is minimized by using very small diameter tubing and the smallest possible pump chamber volume. Plastic tubing should have sufficient wall thickness to minimize the potential for oxygen transfer through the tubing when pumping at very low flow rates. After purging 1-3 volumes of the sampling system, samples are taken from the subsequent water pumped. Since minimum purge sampling requires the minimum possible disturbance to the water column and surrounding formation, dedicated sampling systems are required for this approach. 231
PROCEDURE FOR LOW-FLOW (MINIMAL DRAWDOWN) PURGE AND SAMPLING 5 The pumping rates used for minimum purge sampling are much lower than for low-flow purging, generally 100 ml/minute or less. Drawdown is expected, since it cannot be avoided; however, it is still advisable to pump at the lowest possible rate to limit drawdown to the minimum possible. Monitoring indicator parameters for stability is not part of this approach, since the intention is not to purge until stabilization of these measurements. The pH, specific conductance and turbidity or any other required field parameters should be measured during collection of the sample from the recovered volume. Regulatory approval should be obtained prior to collecting a sample using this method.
Field Records
Field information must be recorded during purging and sampling. At a minimum, the following information should be included in the field forms for each groundwater monitoring well.
o Purge Information (pumping rate, purge volume if required); o Equipment Specifications (pump type, filter type and pore size if used); o Well Data (depth to water, total depth, groundwater elevation); o Field Measurements during purging and at the time of sample collection; and o General weather conditions or other comments
This data is to be recorded on field forms and/or in a data logger.
Other Technical Issues
The following are other technical issues addressed as follows by the facility:
o Dedicated pump intakes are generally set at the middle of the screen. Where water levels have dropped due to drought conditions, the sampling team may lower the pump in order to obtain sufficient sample.
o For wells installed in bedrock, packers are only required to seal off the zone of interest if the bedrock has been determined to be competent (e.g. is not highly fractured).
o The flow cell system does not require decontamination between wells, because the act of purging removes any liquids from other wells and because sampling takes place upstream of the flow cell and only after disconnecting the pump discharge tubing.
232
APPENDIX C
233
BZ-01 11/11/25 2840.92 56.25 2784.67 111.95 - 131.95 4.00 Sch 40 PVC SWE
DTW
E-Water
ft Feet
ft msl
NA
NG Not Gauged
Notes:
Survey Well Elevation
Depth to Water
Elevation of Water
Feet Mean Sea Level
Not Available
GROUNDWATER GAUGING SUMMARY
Former George Air Force Base
Adelanto, California
Sample ID Sample Date SWE
(ft msl)
DTW
(ft)
E-Water
(ft msl)
Screen Interval
(ft bgs)
Casing Diameter
(Inches) Casing Material
234
APPENDIX D FIGURES
235
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C5J1129-01 MW-1A Liquid 10/8/25 8:23 Client 10/08/25 12:40 Client C5J1129-02 MW-2 Liquid 10/8/25 7:45 Client 10/08/25 12:40 Client C5J1129-03 MW-3 Liquid 10/8/25 6:00 Client 10/08/25 12:40 Client C5J1129-04 MW-4 Liquid 10/8/25 10:50 Client 10/08/25 12:40 Client C5J1129-05 MW-5 Liquid 10/8/25 11:22 Client 10/08/25 12:40 Client C5J1129-06 MW-6 Liquid 10/8/25 7:07 Client 10/08/25 12:40 Client C5J1129-07 MW-7 Liquid 10/8/25 9:43 Client 10/08/25 12:40 Client C5J1129-08 MW-8 Liquid 10/8/25 6:30 Client 10/08/25 12:40 Client C5J1129-09 MW-9 Liquid 10/8/25 9:05 Client 10/08/25 12:40 Client C5J1129-10 MW-10 Liquid 10/8/25 10:20 Client 10/08/25 12:40 Client mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
236
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 08:23
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-1A Liquid
C5J1129-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 94 1.0 0.84 mg/L EPA 300.0 10/08/25 21:31 JXM
Sulfate 99 0.50 0.46 mg/L EPA 300.0 10/08/25 21:31 JXM
Nitrate as N 0.62 0.20 0.12 mg/L EPA 300.0 10/08/25 21:31 JXM Fluoride 0.5 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 21:31 JXM Solids
Total Dissolved Solids 480 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.3 0.1 0.07 mg/L EPA 351.2 10/10/25 20:44 CXR Total Nitrogen 0.88 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.34 0.20 0.046 mg/L EPA 200.7 10/14/25 14:36 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
237
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 07:45
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-2 Liquid
C5J1129-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 96 1.0 0.84 mg/L EPA 300.0 10/08/25 21:50 JXM
Sulfate 110 0.50 0.46 mg/L EPA 300.0 10/08/25 21:50 JXM Nitrate as N ND 0.20 0.12 mg/L EPA 300.0 10/08/25 21:50 JXM Fluoride 0.7 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 21:50 JXM Solids
Total Dissolved Solids 510 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 2.8 0.5 0.4 mg/L EPA 351.2 10/10/25 20:45 CXR Total Nitrogen 2.8 0.80 mg/L Calculation
Metals and Metalloids
Boron 0.32 0.10 0.023 mg/L EPA 200.7 10/14/25 15:12 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
238
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 06:00
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-3 Liquid
C5J1129-03
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 96 1.0 0.84 mg/L EPA 300.0 10/08/25 22:09 JXM
Sulfate 100 0.50 0.46 mg/L EPA 300.0 10/08/25 22:09 JXM Nitrate as N 0.30 0.20 0.12 mg/L EPA 300.0 10/08/25 22:09 JXM Fluoride 0.5 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 22:09 JXM Solids
Total Dissolved Solids 500 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen ND 0.1 0.07 mg/L EPA 351.2 10/10/25 20:46 CXR Total Nitrogen ND 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.29 0.10 0.023 mg/L EPA 200.7 10/14/25 15:14 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
239
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 10:50
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-4 Liquid
C5J1129-04
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 100 1.0 0.84 mg/L EPA 300.0 10/08/25 22:28 JXM Sulfate 100 0.50 0.46 mg/L EPA 300.0 10/08/25 22:28 JXM Nitrate as N 1.3 0.20 0.12 mg/L EPA 300.0 10/08/25 22:28 JXM Fluoride 0.5 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 22:28 JXM Solids
Total Dissolved Solids 520 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.2 0.1 0.07 mg/L EPA 351.2 10/10/25 20:48 CXR Total Nitrogen 1.5 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.19 0.10 0.023 mg/L EPA 200.7 10/14/25 15:17 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
240
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 11:22
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-5 Liquid
C5J1129-05
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 100 1.0 0.84 mg/L EPA 300.0 10/08/25 22:47 JXM Sulfate 110 0.50 0.46 mg/L EPA 300.0 10/08/25 22:47 JXM Nitrate as N 2.1 0.20 0.12 mg/L EPA 300.0 10/08/25 22:47 JXM Fluoride 0.6 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 22:47 JXM Solids
Total Dissolved Solids 530 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.07 0.1 0.07 mg/L EPA 351.2 10/16/25 18:58 CXR J Total Nitrogen 2.2 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.10 0.10 0.023 mg/L EPA 200.7 10/14/25 15:19 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
241
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 07:07
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-6 Liquid
C5J1129-06
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 96 1.0 0.84 mg/L EPA 300.0 10/08/25 23:07 JXM
Sulfate 110 0.50 0.46 mg/L EPA 300.0 10/08/25 23:07 JXM Nitrate as N 0.74 0.20 0.12 mg/L EPA 300.0 10/08/25 23:07 JXM Fluoride 0.6 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 23:07 JXM Solids
Total Dissolved Solids 520 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.1 0.1 0.07 mg/L EPA 351.2 10/10/25 20:50 CXR Total Nitrogen 0.89 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.35 0.10 0.023 mg/L EPA 200.7 10/14/25 15:22 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
242
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 09:43
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-7 Liquid
C5J1129-07
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 100 1.0 0.84 mg/L EPA 300.0 10/08/25 23:26 JXM Sulfate 100 0.50 0.46 mg/L EPA 300.0 10/08/25 23:26 JXM Nitrate as N 1.0 0.20 0.12 mg/L EPA 300.0 10/08/25 23:26 JXM Fluoride 0.5 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 23:26 JXM Solids
Total Dissolved Solids 540 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.1 0.1 0.07 mg/L EPA 351.2 10/10/25 20:51 CXR Total Nitrogen 1.1 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.29 0.10 0.023 mg/L EPA 200.7 10/15/25 16:12 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
243
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 06:30
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-8 Liquid
C5J1129-08
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 98 1.0 0.84 mg/L EPA 300.0 10/08/25 23:45 JXM
Sulfate 100 0.50 0.46 mg/L EPA 300.0 10/08/25 23:45 JXM Nitrate as N 0.22 0.20 0.12 mg/L EPA 300.0 10/08/25 23:45 JXM Fluoride 0.5 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/08/25 23:45 JXM Solids
Total Dissolved Solids 510 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.2 0.1 0.07 mg/L EPA 351.2 10/10/25 20:53 CXR Total Nitrogen ND 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.39 0.10 0.023 mg/L EPA 200.7 10/15/25 16:15 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
244
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 10 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 09:05
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-9 Liquid
C5J1129-09
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 110 1.0 0.84 mg/L EPA 300.0 10/09/25 00:04 JXM Sulfate 120 0.50 0.46 mg/L EPA 300.0 10/09/25 00:04 JXM Nitrate as N 1.1 0.20 0.12 mg/L EPA 300.0 10/09/25 00:04 JXM Fluoride 0.5 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/09/25 00:04 JXM Solids
Total Dissolved Solids 570 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.2 0.1 0.07 mg/L EPA 351.2 10/10/25 20:57 CXR Total Nitrogen 1.3 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.28 0.10 0.023 mg/L EPA 200.7 10/15/25 16:17 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
245
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 11 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Laboratory Reference Number
Sample Description
10/08/25 10:20
Sampled Date/Time Received Date/Time
10/08/25 12:40
Matrix
MW-10 Liquid
C5J1129-10
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Chloride 100 1.0 0.84 mg/L EPA 300.0 10/09/25 01:01 JXM Sulfate 100 0.50 0.46 mg/L EPA 300.0 10/09/25 01:01 JXM Nitrate as N 1.2 0.20 0.12 mg/L EPA 300.0 10/09/25 01:01 JXM Fluoride 0.4 0.1 0.03 mg/L SM 4500F C 10/10/25 16:40 CMR Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 10/09/25 01:01 JXM Solids
Total Dissolved Solids 520 10 10 mg/L SM 2540C 10/09/25 20:30 AAR Nutrients
Kjeldahl Nitrogen 0.1 0.1 0.07 mg/L EPA 351.2 10/10/25 20:58 CXR Total Nitrogen 1.3 0.40 mg/L Calculation
Metals and Metalloids
Boron 0.22 0.10 0.023 mg/L EPA 200.7 10/15/25 16:20 ALD mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
246
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 12 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 5J08136 - Analyzed as Received IC
Blank (5J08136-BLK1) Prepared & Analyzed: 10/08/25
Nitrite as N ND 0.1 0.05 mg/L
Sulfate ND 0.50 0.46 mg/L
Chloride ND 1.0 0.84 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (5J08136-BS1) Prepared & Analyzed: 10/08/25
Nitrite as N 2.46 0.1 0.05 mg/L 2.50 98 90-110
Sulfate 24.2 0.50 0.46 mg/L 25.0 97 90-110
Chloride 25.6 1.0 0.84 mg/L 25.0 103 90-110
Nitrate as N 5.63 0.20 0.12 mg/L 5.65 100 90-110
Matrix Spike (5J08136-MS1) Source: C5J1139-03 Prepared & Analyzed: 10/09/25 Nitrite as N 2.43 0.1 0.05 mg/L 2.50 0.102 93 80-120
Sulfate 86.9 0.50 0.46 mg/L 25.0 63.4 94 75-128
Chloride 104 1.0 0.84 mg/L 25.0 78.8 100 84-129
Nitrate as N 12.0 0.20 0.12 mg/L 5.65 6.12 104 75-131
Matrix Spike (5J08136-MS2) Source: C5J1144-02 Prepared & Analyzed: 10/09/25 Nitrite as N 2.53 0.1 0.05 mg/L 2.50 0.146 95 80-120
Sulfate 125 0.50 0.46 mg/L 25.0 102 95 75-128
Chloride 117 1.0 0.84 mg/L 25.0 91.7 101 84-129
Nitrate as N 11.4 0.20 0.12 mg/L 5.65 5.44 105 75-131
Matrix Spike Dup (5J08136-MSD1) Source: C5J1139-03 Prepared & Analyzed: 10/09/25 Nitrite as N 2.44 0.1 0.05 mg/L 2.50 0.102 93 80-120 0.5 20 Sulfate 87.0 0.50 0.46 mg/L 25.0 63.4 94 75-128 0.02 20 Chloride 104 1.0 0.84 mg/L 25.0 78.8 99 84-129 0.2 20
Nitrate as N 12.0 0.20 0.12 mg/L 5.65 6.12 104 75-131 0.06 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
247
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 13 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 5J10128 - Analyzed as received
Blank (5J10128-BLK1) Prepared & Analyzed: 10/10/25
Fluoride ND 0.1 0.03 mg/L
LCS (5J10128-BS1) Prepared & Analyzed: 10/10/25
Fluoride 1.06 0.1 0.03 mg/L 1.00 106 90-110
Matrix Spike (5J10128-MS1) Source: C5J0294-01 Prepared & Analyzed: 10/10/25 Fluoride 1.58 0.1 0.03 mg/L 1.00 0.380 120 75-125
Matrix Spike Dup (5J10128-MSD1) Source: C5J0294-01 Prepared & Analyzed: 10/10/25 Fluoride 1.53 0.1 0.03 mg/L 1.00 0.380 115 75-125 3 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
248
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 14 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 5J09152 - Analyzed as received
Blank (5J09152-BLK1) Prepared & Analyzed: 10/09/25
Total Dissolved Solids ND 10 10 mg/L
LCS (5J09152-BS1) Prepared & Analyzed: 10/09/25
Total Dissolved Solids 742 10 10 mg/L 746 99 90-110
Duplicate (5J09152-DUP1) Source: C5J1129-10 Prepared & Analyzed: 10/09/25 Total Dissolved Solids 517 10 10 mg/L 516 0.2 20
Duplicate (5J09152-DUP2) Source: C5J1243-01 Prepared & Analyzed: 10/09/25 Total Dissolved Solids 783 10 10 mg/L 780 0.4 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
249
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 15 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 5J09143 - Acid Digest
Blank (5J09143-BLK1) Prepared & Analyzed: 10/10/25
Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (5J09143-BS1) Prepared & Analyzed: 10/10/25
Kjeldahl Nitrogen 0.911 0.1 0.07 mg/L 1.00 91 80-120
Matrix Spike (5J09143-MS1) Source: C5J1076-01 Prepared & Analyzed: 10/10/25 Kjeldahl Nitrogen 7.55 0.5 0.4 mg/L 5.00 3.12 89 42-154 Matrix Spike Dup (5J09143-MSD1) Source: C5J1076-01 Prepared & Analyzed: 10/10/25 Kjeldahl Nitrogen 8.20 0.5 0.4 mg/L 5.00 3.12 102 42-154 8 25 Batch 5J15172 - Acid Digest
Blank (5J15172-BLK1) Prepared & Analyzed: 10/16/25
Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (5J15172-BS1) Prepared & Analyzed: 10/16/25
Kjeldahl Nitrogen 0.962 0.1 0.07 mg/L 1.00 96 80-120
Matrix Spike (5J15172-MS1) Source: C5J0637-01RE1 Prepared & Analyzed: 10/16/25 Kjeldahl Nitrogen 4.38 0.5 0.4 mg/L 5.00 ND 88 42-154
Matrix Spike Dup (5J15172-MSD1) Source: C5J0637-01RE1 Prepared & Analyzed: 10/16/25 Kjeldahl Nitrogen 5.94 0.5 0.4 mg/L 5.00 ND 119 42-154 30 25 QRPDa mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
250
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 16 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Metals and Metalloids - Batch Quality Control
Batch 5J13209 - EPA 200.2
Blank (5J13209-BLK1) Prepared: 10/13/25 Analyzed: 10/14/25 Boron ND 0.10 0.023 mg/L
LCS (5J13209-BS1) Prepared: 10/13/25 Analyzed: 10/14/25 Boron 0.871 0.10 0.023 mg/L 0.833 105 85-115
Duplicate (5J13209-DUP1) Source: C5J0862-04 Prepared: 10/13/25 Analyzed: 10/16/25 Boron 3.40 2.0 0.46 mg/L 3.54 4 20
Matrix Spike (5J13209-MS1) Source: C5J0862-04 Prepared: 10/13/25 Analyzed: 10/16/25 Boron 4.29 2.0 0.46 mg/L 0.833 3.54 90 70-130
Matrix Spike Dup (5J13209-MSD1) Source: C5J0862-04 Prepared: 10/13/25 Analyzed: 10/16/25 Boron 4.28 2.0 0.46 mg/L 0.833 3.54 90 70-130 0.09 20
Batch 5J14193 - EPA 200.2
Blank (5J14193-BLK1) Prepared: 10/14/25 Analyzed: 10/15/25 Boron ND 0.10 0.023 mg/L
LCS (5J14193-BS1) Prepared: 10/14/25 Analyzed: 10/15/25 Boron 0.837 0.10 0.023 mg/L 0.833 100 85-115
Matrix Spike (5J14193-MS1) Source: C5J1076-01 Prepared: 10/14/25 Analyzed: 10/15/25 Boron 1.07 0.20 0.046 mg/L 0.833 0.194 105 70-130
Matrix Spike Dup (5J14193-MSD1) Source: C5J1076-01 Prepared: 10/14/25 Analyzed: 10/15/25 Boron 1.06 0.20 0.046 mg/L 0.833 0.194 104 70-130 1 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
251
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 17 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
Notes and Definitions
J Estimated value
QRPDa Both percent recoveries were acceptable, however, the RPD result was above laboratory acceptance criteria.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
252
Client Name:
Report Date:
PERC Water Corp
19101 Jonathan St.
Dave Kachelski
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 18 of 18
Project Name:
20-Oct-2025 Work Order Number: C5J1129
Received on Ice (Y/N): Yes Temp: 10 °C
PERC - Semi-Annual MW
Semi-Annual Groundwater Monitoring Sampli
C5J1129
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
253
Water Department
Monthly Operating Report
December 2025
254
Table of Contents
Section Page No.
1. Executive Summary…………………………………………………………………………………………………….1
2. Health & Safety…………………………………………………………………………………………………………..2
3. Regulatory Compliance……………………………………………………………………………………..………..3
4. Water Production & Treatment……………………………………………………………………………….…..4
4.1 Operations…………………………………………………………………………………………………….……….4
5. Water Distribution………………………………………………………………………………………………….……7
5.1 Production………………………………………………………………………………………………………...…...7
5.2 Maintenance…………………………………………………………………………………………………….…….8
6. Current Challenges……………………………………………………………………………………………………...9
7. Personnel……………………………………………………………………………………………………………..……12
8. Budget……………………………………………………………………………………………………………….………13 255
City of Adelanto 1 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
1. EXECUTIVE SUMMARY
The following operational overview highlights the successful operations of the City’s water system from December 1 – December 31, 2025. With more than 100 days of continuous operations completed, Woodard & Curran has moved beyond the transition phase and into stable, fully integrated operations.
The focus has shifted to operational excellence, preventative maintenance, staff development, and system optimization, supported by ongoing safety audits and the continued implementation of the Enterprise Asset Management System (EAMS).
Health & Safety
The safety of our employees, City staff, contractors, and ratepayers remains Woodard & Curran’s highest priority. We are pleased to report that there were no OSHA-recordable or lost-time incidents during this reporting period, and we have now reached 108 days without a safety incident.
Regulatory Compliance
Woodard & Curran met regulatory compliance standards for the City’s public water system in accordance with regulations from the Division of Drinking Water.
Capital Improvement Projects
Woodard & Curran has reviewed the previous O&M firm’s CIP recommendations and is engaged in discussions with the City’s Engineering Department. We will continue to partner with the City’s Engineering Department and position the city to implement necessary capital improvement projects.
Budget
Adelanto’s budget execution through December demonstrates strong fiscal discipline and efficient resource utilization. Spending remains consistently below budgeted levels, primarily due to reduced labor and supply-related costs. Although minor overages exist in discretionary expense categories, they are offset by substantial savings elsewhere. Overall, financial management appears efficient and conservative, maintaining healthy budget variances.
256
City of Adelanto 2 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
2. HEALTH & SAFETY
December: Hearing Protection
At Woodard & Curran, employee safety is our top priority. Protecting our hearing is an important part of maintaining a safe and healthy workplace. Noise-induced hearing loss can develop gradually over time or result from short-term exposure to loud equipment, and the damage is often permanent. Because hearing loss may not be immediately noticeable, consistent use of hearing protection is essential to prevent longterm injury and ensure employees go home safely each day.
Water department staff may be exposed to elevated noise levels during routine operations and maintenance activities. Common noise sources include pumps, motors, compressors, treatment processes, vehicles, heavy equipment, and power tools. Noise hazards can be greater during extended work periods or when working in enclosed areas such as pump stations, treatment facilities, and mechanical rooms.
By staying aware of noise hazards and using hearing protection during daily tasks, Woodard & Curran staff support a safe work environment and reinforce our commitment to safety-first operations.
SPARKS Program Overview
The SPARKS Program is an O&M safety initiative designed to recognize employees who demonstrate a strong personal commitment to safety and consistently work with their peers to maintain a safe and healthy work environment. Each year, staff are evaluated on established safety goals—such as maintaining zero OSHA-recordable incidents, completing required safety training, attending monthly safety meetings, and fulfilling all annual H&S tasks. When individuals and teams meet these expectations, they become eligible for an annual incentive, with increased rewards for consecutive years of achievement. The program reinforces daily safe-work habits, strengthens teamwork, and encourages proactive communication about safety, all of which contributes to our long-term safety performance.
Staff Participation
This year, participation in the SPARKS Program continues to grow, with all staff now actively involved in meeting the required safety goals. Employees are engaging in monthly training, collaborating more effectively on hazard identification, and supporting one another in maintaining compliance with program requirements. The increased participation reflects strong team commitment and helps ensure that everyone has a role in sustaining a safe workplace. As staff continue to meet their annual safety objectives, they remain eligible for SPARKS incentives—further reinforcing the positive safety behaviors the program was designed to promote.
257
City of Adelanto 3 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
3. REGULATORY COMPLIANCE
During this reporting period, the City of Adelanto has maintained 100% regulatory compliance with the Division of Drinking Water (DDW) in accordance with Permit CA3610001. Samples are collected and submitted for analysis to Geo-Monitor on a weekly basis. Additional sampling reports can be found in the Appendix.
Table 3-1 – Compliance Sampling
Samples Taken Compliant Excursions % Compliant
50 50 0 100
Table 3-2 – Treatment Plant Sampling Results (Avg)
December 2025
Analysis MCL Result Violation (Y/N)
Iron 300 ND N
Manganese 50 5.2 N
Arsenic 10 ND N
Fluoride 2 0.07 N
Table 3-2 – Pump House Sampling Results (Avg)
December 2025
Analysis MCL Result Violation (Y/N)
Iron 300 ND N
Manganese 50 ND N
Arsenic 10 ND N
Fluoride 2 0.41 N
The City has been directed by the state to reduce water loss by January 1, 2028. To meet this requirement, Woodard & Curran is implementing a more detailed data collection process to account for water loss as the City makes other necessary steps to meet this requirement.
Table 3-3 – Monthly Water Loss
(December)
Total Potable Supply Total Potable Demand Difference Estimated Water Loss (gallons)
125,412,411 81,177,110 44,235,301 50,000
258
City of Adelanto 4 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
4. WATER PRODUCTION AND TREATMENT
4.1 Operations
During this reporting period, the City of Adelanto produced 49.26 million gallons of water from six active wells. One of these wells (8G2) disinfects water at the wellhead prior to transmission to one of six water storage tanks. Four of these wells (1G, 3G, 4G, 8G) send water to the Water Treatment Plant (WTP) to treat iron and manganese. This treatment process consists of Iron and Manganese Filtration. Following treatment for iron and manganese, the WTP’s effluent is blended with water from the other wells and purchased water from Mojave Water Agency and the City of Victorville (as needed) in the City’s water storage tanks and distribution system. In December, 66.97 million gallons were purchased from MWA R3 connection.
During this reporting period (December), the WTP treated 41.13 million gallons of raw water, and all samples were within acceptable ranges for iron, manganese, and other contaminants. In addition to weekly samples sent to Geo Monitor, Woodard & Curran’s staff takes daily samples to maintain process control, and these results are found in Table 4-1.
259
City of Adelanto 5 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
Table 4-1
260
City of Adelanto 6 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
5. WATER DISTRIBUTION
5.1 Production
The City of Adelanto’s water distribution system consists of 6 water storage tanks (21.750 million gallons combined), 3 Pressure Reducing Valves (PRVs), and 180 miles of water mains that serve approximately 38,000 residents and commercial/industrial entities with 8,900 meters. Water is also purchased from MWA to meet the City’s daily water demand, and additional water can be purchased from the City of Victorville (COV) on an as-needed basis. The purchased water connection to MWA and COV is located at 5Mil location. The allocation of the City’s water supply sources for this reporting period can be found in Table 5-1.
Water Supply Sources (December 2025)
Water Supply Source Quantity
City of Adelanto 49.26 MG
Mojave Water Agency 66.97 MG
City of Victorville 0 MG
Total Drinking Water 116.23 MG
261
City of Adelanto 7 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
5.2 Maintenance
Woodard & Curran is in the process of developing the CMMS to incorporate preventative, corrective, and predictive maintenance tasks for the City’s distribution system.
5.2.1 Service Connection Repair/Replacement
- Water Meter Replacement Project 95% Complete
- Water Meter MXU Installation Project: December 2025 – January 31, 2025 For reference, MXU installation totals are as follows:
• Phase 1: 7,000 smart points
• Phase 2: 1,600 smart points (Ongoing)
• Total: 8,600 smart points
Other:
- Cross Connection Management Plan submitted to State Resources Control Board.
5.2.2 Water Leaks/Emergency Response
Contractor Date Site Type
TK Const. 11/15/2025 14374 Greta Dr. SS
TK Const. 12/22/2025 10875 Rancho Rd. LS
TK Const. 12/23/2025 17401 Adelanto Rd. Main
262
City of Adelanto 8 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
6.0 Current Challenges
During our first 108 days of operations, our team has identified several challenges that we will discuss with the City in more detail following further investigation.
Corrective Maintenance and Emergency Repairs:
- Well Field: Rain/Mud accumulation at Well 14A and 4G – 14A off until further notice. - Well Field Repairs & Maintenance including housekeeping and upkeep - Well 16 Rehabilitation Project: Ongoing
Projects Scheduled:
- Water Treatment Plant Filtration Media Inspection
- Well 14: Troubleshoot Electrical, Equipment for Additional Production - Install Protective Barrier around Well 14 and Well 4.
Table 6-1
Location Equipment Possible Issue Notes
1200 Booster
Station
Booster #1 The equipment must be upgraded to
comply with applicable codes and
regulations
*Electrical/MCC Completed
1200 Booster
Station
Booster #2 The equipment is
semi-operational
but not
recommended.
The equipment must be upgraded to
comply with applicable codes and
regulations
*Electrical/MCC Completed
& Pump Operational
1200 Booster
Station
Booster #3 Inoperable –
Status Unknown
The equipment must be upgraded to
comply with applicable codes and
regulations
1200 Booster
Station
Roof Leaks *Completed
1200 Booster
Station
N. Booster Pump
#4
Not piped into new booster manifold;
connected to a transmission main that
has been abandoned.
1200 Booster
Station
N. Booster Pump
#5
Has run log from 2016 – Status
Unknown
263
City of Adelanto 9 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
Location Equipment Possible Issue Notes
Lower Booster
Station
Booster Pump #1 Needs sample port installed
Lower Booster
Station
Booster Pump #2 Inoperable – Status Unknown
Lower Booster
Station
Booster Pump #3 Hour Meter – Inoperable
Lower Booster
Station
Booster Pump #4 Mechanical Seal;
other
LOTO
Lower Booster
Station
Booster Pump #5 Leak near concrete on tank side
Lower Booster
Station
Booster Pump #6 Pressure switch broken – Status
Unknown
Lower Booster
Station
Booster Pump #7 Possible Electrical
issue; Motor get
hot
Relatively new VFD
Lower Booster
Station
PRV #2 Needs to be
serviced
Upper Booster
Station
Booster Pump #1
Rehabilitated never put into service.
Status Unknown. Layne did work. SR
hasn't run it.
Upper Booster
Station
Booster Pump #2 Inoperable – Status Unknown
Upper Booster
Station
PRV Turns
counterclockwise
instead of
clockwise
Back feeds from 5M to 3M
Upper Booster
Station
Mag Meter SCADA doesn’t
recognize
Gauge inside; very heavy access hatch
Well Field Well 14A Hour meter inoperable
Well Field Well 4G Hour meter inoperable
Well Field Well 1G Hour meter inoperable
WTP FI600 Flow Meter Believed to ghost high; shuts off WTP WTP PDI 400 Pressure
Indicator
Calibration issue
or BW procedure
Doesn’t read properly to SCADA; may
not be reading correctly in the field.
WTP Raw Water Pump
P502
Pumps at reduced
capacity bs P501
WTP Raw Water Media
Trap
Removes fine particulates; Used to
remove sand in trap - Replace
264
City of Adelanto 10 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
WTP Effluent Filter
Media Trap
Removes fine particulates – Replace
Location Equipment Possible Issue Notes
WTP Filter Valves Limit Switch
Adjustment
Lim Torque
WTP PI500 Pressure Calibration
WTP Fl700 Flow Meter Inoperable Decant Flow
WTP Backwash Settling
Tank
Level Transducer
inaccurate
Tank overflows @12ft, Tank ~25ft
WTP No idea where overflow/decant flow to
WTP P701 Sludge
Pumps
Inoperable – Status Unknown
WTP P702 Sludge
Pumps
Inoperable – Status Unknown
WTP Eye Wash Station Leaks H&S Audit Item
*Completed
WTP
Backwash
Isolation Point
18” Rising
Stem/Cla Valves
Corroded
Status Unknown
Field PRV #1 New/Rehab: 2024
Field PRV #3 Closed/Failed
Open – Needs To
Be Repaired
Recommended replacing/middle of
street
Field PRV #4 Abandoned Isolated – Lots of Sand, Steel Plate Field PRV #5 No Isolation on
High End
Not Been Serviced; Underground – In
the Road
Field North Area No Pressure
Monitoring
N. Area of City
265
City of Adelanto 11 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
7. PERSONNEL
The City of Adelanto is supported by a dedicated team of six (6) full-time on-site personnel; however, two are presently vacant as the recruitment process for qualified candidates is underway. In addition, both the City and the on-site team are backed by a broad network of technical and administrative experts from Woodard & Curran.
Onsite Staff
Daniel Peralta - Interm Project Manager
Salvador Ruiz - Lead Operator
Adrian Villareal - Operator
Edward Rodriguez - Operator
Vacancy - Operator
Vacancy - Operator
Additional Support Staff
Chris McMahon – Area Manager
Dave Kitzmiller – Operations Leader-Western U.S.
Marc Thomas – National Operations Leader
Anthony Naccarato – Client Services Manager
Leilah Johnson – Transition Manager
Steve Lindemann – O&M Health & Safety Manager
Renae Schield – Health & Safety Specialist
Alan Fabiano – O&M Technology Manager
Ken Davis – Asset Management Services Manager
266
City of Adelanto 12 Woodard & Curran, Inc.
Adelanto Water MOR December 2025 December 2025
8. BUDGET
267
State of California -- Health and Human Services Agency Department of Public Health
MONTHLY SUMMARY OF DISTRIBUTION SYSTEM COLIFORM MONITORING Drinking Water Program
(including triggered source monitoring for systems subject to the Groundwater Rule) System Name System Number
Sampling Period
Year
Month
1. Routine Samples (see note 1) 0 0
2. Repeat Samples following Samples that are Total Coliform Positive and Fecal/E.coli Negative (see notes 5 and 6) 0 0
3. Repeat Samples following Routine Samples that are
Total Coliform Positive and Fecal/E.coli Positive
(see notes 5 and 6) 0 0
4. MCL Computation for Total Coliform Positive Samples
a. Totals (sum of columns) 0 0
b. If 40 or more samples collected in month, determine
percent of samples that are total coliform positive
[(total number positive/total number collected) x 100] = % c. Is system in compliance… …with fecal/E. coli MCL?
(see notes 2 and 3) Yes No
…with monthly MCL? Yes No
(see note 4)
5. Source Samples Triggered by Routine Samples that are Total Coliform Positive 0 0 (This applies only to systems subject to the Groundwater Rule - see notes 7 and 8)
6. Invalidated Samples
(Note what samples, if any, were invalidated; who authorized the invalidation; and when replacement samples were collected. Attach additional sheets, if necessary.)
7. Summary Completed By:
Signature Title Date
NOTES AND INSTRUCTIONS:
1. Routine samples include:
a. Samples required pursuant to 22 CCR Section 64423 and any additional samples required by an approved routine sample siting plan established pursuant to 22 CCR Section 64422. b. Extra samples are required for systems collecting less than five routine samples per month that had one or more total coliform positives in previous month; c. Extra samples for systems with high source water turbidities that are using surface water or groundwater under direct influence of surface water and do not practice filtration in compliance with regulations;
2. Note: For a repeat sample following a total coliform positive sample, any fecal/E.coli positive repeat (boxed entry) constitutes an MCL violation and requires immediate notification to the Department (22, CCR, Section 64426.1).
3. Note: For repeat sample following a fecal/E.coli positive sample, any total coliform positive repeat (boxed entry) constitutes an MCL violation and requires immediate notification to the Department (22, CCR, Section 64426.1).
4. Total coliform MCL (Notify Department within 24 hours of MCL violation):
a. For systems collecting less than 40 samples, if two or more samples are total coliform positive, then the MCL is violated. b. For systems collecting 40 or more samples, if more than 5.0 percent of samples collected are total coliform positive, then the MCL is violated.
5. Positive results and their associated repeat samples are to be tracked on the Coliform Monitoring Worksheet.
6. Repeat samples must be collected within 24 hours of being notified of the positive results. For systems collecting more than one routine sample per month, three repeat samples must be collected for each total coliform positive sample. For systems collecting one or fewer routine samples per month, four repeat samples must be collected for each total coliform positive sample.
7. For systems subject to the Groundwater Rule: Positive results and the associated triggered source samples are to be tracked on the Coliform Monitoring Worksheet.
8. For triggered sample(s) required as a result of a total coliform routine positive sample, an E.coli, enterococci, or coliphage positive triggered sample (boxed entry) requires immediate notification to the Department, Tier 1 public notification, and corrective action. 10/2009 - 8477 December 2025
City Of Adelanto CA3610001
0 50
Number
Collected
Number
Required
50 Number Fecal/
E.coli Positives
Number Total
Coliform Positives
50 0
Project Manager 1/6/2026
50 0
0 268
CITY COUNCIL AGENDA REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: January 28, 2026
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
BY: Virginia Velis, Executive Assistant/Deputy City Clerk SUBJECT: CONSIDERATION OF A RESOLUTION APPROVING THE CITY’S
COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM FOR FISCAL
YEAR 2026-27
STAFF RECOMMENDATION:
1. Open the public hearing and receive public testimony; and
2. Adopt Resolution No. 26-01 authorizing the City’s Community Development Block Grant (CDBG) Program for Fiscal Year 2026–27.
BACKGROUND:
The primary national objectives of the Federal Community Development Block Grant (CDBG) Program are to support activities that benefit low- and moderate-income persons and/or eliminate slum and blight conditions within the City. Federal regulations require that at least seventy percent (70%) of CDBG funds be expended on activities benefiting low- and moderateincome individuals.
The U.S. Department of Housing and Urban Development (HUD) administers the CDBG Program and establishes program regulations. Cities with populations under 50,000 do not receive CDBG funding directly from HUD but instead participate in their respective counties. The City of Adelanto receives CDBG funds as a participating city through the County of San Bernardino Community Development and Housing Department (CDH).
CDH has notified the City that the estimated CDBG allocation for Fiscal Year (FY) 2026–27 is $174,788, representing a decrease of $126,401 from the prior year allocation of $301,189.
Allocations are based on a federally established formula that considers population, poverty level, and overcrowding. Final allocation amounts may vary slightly and are typically confirmed by HUD 269
in the spring prior to the start of July 1 of the new program year.
A resolution approving the City’s use of CDBG funds must be submitted to CDH by February 12, 2026. Funds will become available for expenditure beginning July 1, 2026.
ELIGIBLE ACTIVITIES FOR FUNDING:
The types of activities that may be funded under the program, provided they meet one of the national objectives, include the following:
• Public Services: Senior support, youth programs, childcare, food banks, job training, literacy, health services, and services for the homeless. • Housing: Rehabilitation of owner-occupied homes (roofs, windows, ADA features, weatherproofing), energy/water efficiency upgrades, and connecting homes to sewer/water lines.
• Public Facilities/Infrastructure: Building or renovating parks, senior centers, neighborhood facilities, streets, sidewalks, and water/sewer systems, or converting schools for eligible uses.
• Economic Development: Assisting small businesses (microenterprises) for job creation or retention, providing job training, and supporting entrepreneurs. • Property Acquisition: Purchasing land or buildings for eligible public uses like community centers or redevelopment.
INELIGIBLE ACTIVITIES:
Generally, the following activities cannot be funded by CDBG:
• Construction of new housing (unless specifically authorized by HUD). • General government operations, including salaries for routine functions or construction of new government offices.
• Political activities, lobbying, or campaigning.
• Routine maintenance and operations (e.g., standard facility repairs or utilities). • Direct income payments beyond three months of emergency assistance.
ONGOING PROJECTS:
Public Service Programs / Community-Based Organizations (CBOs) Public service activities include social services such as food and clothing distribution, health care services, and job skills training. Public service expenditures are limited to 15% of the City’s annual CDBG allocation. For FY 2026–27, this amount is $26,218.
The City received eight (7) applications requesting public service funding and 1 construction project.
270
FISCAL IMPACT:
There is no fiscal impact to the current FY 2025-26 budget. As part of the FY 2026–27 budget development process, CDBG funds will be appropriated for the approved projects in the amounts authorized by City Council.
Public Service Programs (15% Maximum) Proposed Amounts:
• High Desert Outreach Center ........................................ $3,745.42 • New Leaf Ministries...................................... $3,745.42 • I Am Love Movement................................................ $3,745.42 • Molding Hearts, Org............................................ $3,745.42 • Community Health Action Network ............................. $3,745.42 • Adelanto Community Resource Center............................... $3,745.42 • Vestria………………$3,745.42
Capital Improvement Project:
• City of Adelanto – Construction of Bellflower Park ................................. $148,570.00 ATTACHMENTS:
1. Resolution Number 26-01
2. 2026-2027 CDBG Project Proposals
271
RESOLUTION NO. 26-01
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ADELANTO, COUNTY OF SAN BERNARDINO, CALIFORNIA, APPROVING THE CITY’S COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM FOR FISCAL YEAR 2026-27 WHEREAS, on August 22, 1974, the President of the United States signed into law the Housing and Community Development Act of 1974 (“Act”); and WHEREAS, the primary goals of Title I of the Act are the development of viable urban communities by providing decent housing and a suitable living environment, and expanding economic opportunities, principally for persons of low- and moderate-income; and WHEREAS, the City of Adelanto has received notification of the availability of $174,788 in Federal Community Development Block Grant (CDBG) funds to further the attainment of these goals during Fiscal Year 2026-27; and
WHEREAS, suggestions have been requested from City departments for the utilization of these funds; and
WHEREAS, the City has published information and solicited comments regarding eligible activities under the Act and has conducted a public hearing to solicit comments and suggestions from the community for the utilization of these funds.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ADELANTO DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The above recitals are true and correct and are incorporated herein by reference.
SECTION 2. That the City allocates its available Community Development Grant funds for the following purposes:
SECTION 3. That the City Manager is authorized and directed to submit the City’s final Program Planning Summary for Fiscal Year 2026-27 to the County of San Bernardino, reflecting the funding allocations set forth herein.
SECTION 4. The City Manager and/or his designee is authorized to adjust the program budget as necessary to take into account the final CDBG allocation and any amounts remaining unspent at the close of the fiscal year, including any unallocated amounts from prior years.
SECTION 5. That the City Manager and/or his designee is authorized to execute the contractual and related documents prepared by the County of San Bernardino that are required for the implementation of the projects/programs set forth herein. 272
Resolution No. 26-01
SECTION 6. The provisions of this Resolution are severable and if any provision, clause, sentence, word or part thereof is held illegal, invalid, unconstitutional, or inapplicable to any person or circumstances, such illegality, invalidity, unconstitutionality, or inapplicability shall not affect or impair any of the remaining provisions, clauses, sentences, sections, words or parts thereof of the Resolution or their applicability to other persons or circumstances.
SECTION 7. That the City Clerk shall certify the adoption of this Resolution and that the same shall be in full force and effect upon adoption.
The City Council hereby approves and allocates its available Community Development Block Grant (CDBG) funds for Fiscal Year 2026–27 for the following projects and programs:
Public Service Programs (15% Maximum) Proposed Amounts:
• High Desert Outreach Center ........................................ $3,745.42 • New Leaf Ministries...................................... $3,745.42 • I Am Love Movement................................................ $3,745.42 • Molding Hearts, Org............................................ $3,745.42 • Community Health Action Network ............................. $3,745.42 • Adelanto Community Resource Center............................... $3,745.42 • Vestria………………$3,745.42
Capital Improvement Project:
• City of Adelanto – Construction of Bellflower Park ................................. $148,570.00 273
Resolution No. 26-01
PASSED, APPROVED AND ADOPTED this 28th day of January 2026. ______________________________
Gabriel Reyes, Mayor
_______________________________
Brenda Lopez, City Clerk
274
Resolution No. 26-01
I, Brenda Lopez, City Clerk of the City of Adelanto, California, do hereby certify that the foregoing Resolution No. 26-01 was duly and regularly adopted by the City Council of the City of Adelanto at a regular meeting held on the 28th day of January 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS THEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 28th day of January 2026.
______________________________
Brenda Lopez, City Clerk
275
San Bernardino County
Department of Community Development and Housing
2026-2027 CDBG Project Proposals
New/ Continuing City Applicant Submission ID Project Title Short Activity Description Total
Review
Score
Amount
Requested
Eligible?
Yes/No
Cont Adelanto
Deanna Wilson, Executive Director
High Desert Community Foundation/
High Desert Outreach Center
PO BOX 2028,
Apple Valley, California 92307
[email protected]
1-760-242-8877
52328618
Adelanto: Food Distribution
Program - High Desert
Outreach Center
The High Desert Outreach Center – Food Delivery project provides food distribution and delivery services to low- and moderate-income households in the City of Adelanto. The program includes twice-weekly delivery of food bags to families, seniors, and persons with disabilities who are unable to access traditional food distribution sites. Services are provided year-round and are supported through volunteer coordination, intake documentation, and partnerships with local organizations. During the program year, the activity is expected to serve approximately 500 unduplicated individuals, representing an estimated 1,500 households receiving food assistance.
94 $ 20,000 Yes
Cont Adelanto
Amanda Uptergrove, Pastor
New Leaf Ministries
11877 Tara Lane,
Adelanto, CA 92301
[email protected]
1-949-377-6004
51982326
Adelanto: Food & Clothing
Distribution - New Leaf
Ministries
The Food, Clothing, and Resource Bank provides free food, clothing, and basic household necessities to low- and moderate-income individuals and families in the City of Adelanto and surrounding unincorporated areas. Services include the distribution of food, clothing, hygiene items, diapers, pet food, and other essential supplies through regularly scheduled in-person service days. The program operates year-round and prioritizes seniors, veterans, families, and individuals experiencing financial hardship. During the program year, the activity is expected to serve approximately 300 unduplicated individuals, representing an estimated 2,500 total service encounters.
93 $ 60,000 Yes
New Adelanto
Sir Duplechan, Director
I Am Love Movement
12036 Bartlett Ave, B
Adelanto, CA 92301
[email protected]
1-661-547-9700
52330887
Adelanto: Food Distribution
Program - I am Love
Movement
The I Am Love North East Adelanto Food Bank provides weekly food distribution services to residents of North East Adelanto, a designated low- and moderate-income service area. The program distributes nutritious food items and essential supplies through a weekly on-site distribution and includes home delivery for seniors and persons with disabilities who are unable to travel. Services are provided year-round and are designed to address food insecurity among vulnerable households. During the program year, the activity is expected to serve approximately 4,272 unduplicated individuals through regular weekly distributions and deliveries.
93 $ 10,000 Yes
New Adelanto
LaKita Johnson, Executive Director
Molding Hearts, Org.
387 Magnolia Avenue, Suite 103
#317
Corona, California 92879
[email protected]
1-760-246-7736
52339700 Adelanto: Senior Center
Rehabilitation
The Adelanto Senior Sanctuary for Safety and Wellness Project will rehabilitate and modernize the Adelanto Senior Center to improve safety, accessibility, and essential services for low- and moderate-income seniors, including seniors experiencing homelessness or disabilities. The project includes ADA accessibility upgrades, restroom and flooring improvements, enhanced lighting, kitchen and hygiene facilities, and the creation of a senior technology and safety lab. These improvements will support daily meal service, wellness programming, and safe community access. Upon completion, the facility is expected to benefit approximately 420 seniors residing in the City of Adelanto and surrounding areas. 90 $ 590,000 Yes
Cont Adelanto
Jessie Flores, City Manager
City of Adelanto
11600 Air Express Way,
Adelanto, Ca 92301
[email protected]
1-760-246-2300
52338306 Adelanto: Construction of
Bellflower Park
The Bellflower Park project will construct a new public park on vacant land at the intersection of Bellflower Street and Chamberlaine Way in the City of Adelanto. The project will include playground equipment, walking paths, open green space, seating, and landscaping to provide a safe, accessible recreational area for residents of an identified low- and moderate-income service area. The park will be publicly accessible and is expected to benefit approximately 1,500 residents living within the surrounding neighborhood and census block groups.
88 $ 350,000 Yes
Eligible Projects
276
San Bernardino County
Department of Community Development and Housing
2026-2027 CDBG Project Proposals
New/ Continuing City Applicant Submission ID Project Title Short Activity Description Total
Review
Score
Amount
Requested
Eligible?
Yes/No
Cont Adelanto
Cornelious Page Jr., Executive
Director
Community Health Action Network
15000 7th Street, Suite 208G
Victorville, CA 92395
[email protected]
1-909-275-5361
52308548 Adelanto: Community
Health Action Network
The Emergency Assistance Program provides short-term utility payment assistance to low- and moderateincome households residing in the City of Adelanto who are experiencing financial hardship. The program offers up to $400 per eligible household to prevent disconnection of essential electric, gas, or water services, with payments made directly to utility providers. Services are provided on a one-time, as-needed basis and are supported by case management, income verification, and required financial literacy education. During the program year, the activity is expected to serve approximately 87 unduplicated households, helping residents maintain stable and safe living conditions. 80 $ 42,300 Yes
Cont Adelanto
Melva J Davis, Chairperson
The Adelanto Community Resource
Center
11824 Air Expressway,
Adelanto, California 92301
[email protected]
1-909-874-1906
52379893
Adelanto: Emergency Food
and Clothing Distribution –
Adelanto Community
Resource Center
The Emergency Food and Clothing Pantry provides weekly emergency food assistance and basic necessities to low- and moderate-income households within the Adelanto School District service area, with priority given to families with children. Services include the distribution of shelf-stable food items, hygiene supplies, diapers, baby food, and limited clothing and school supplies. Clients may receive assistance up to twice per month, with delivery available for individuals with disabilities. During the program year, the activity is expected to serve approximately 180 unduplicated individuals, representing an estimated 1,800 total service instances, helping households experiencing food insecurity and other immediate basic needs. 76 $ 25,000 Yes
New Adelanto
Dania Aceves, CEO
Vestria
11827 Galewood St,
Adelanto, CA 92301
[email protected]
1-442-401-0452
52310303 Adelanto: Youth Serve
Seniors - Vestria
The Youth Serve Adelanto project provides youth-led property maintenance and light home assistance services for low- and moderate-income senior residents in the City of Adelanto. Supervised youth volunteers perform yard maintenance, light home cleaning, and basic gardening to reduce safety hazards, improve accessibility, and support seniors who are physically unable or lack resources to maintain their properties. Services are delivered on a one-time and periodic basis throughout the program year. During the program period, the activity is expected to serve approximately 100 unduplicated senior households, while engaging up to 50 youth participants in community service. 71 $ 42,800 Yes
New Adelanto
Jessie Flores, City Manager
City of Adelanto
11600 Air Express Way,
Adelanto, Ca 92301
[email protected]
1-760-246-2300
52336499 Adelanto: Chamberlaine
Way Street Rehabilitation
The proposed project is not eligible for CDBG funding because the segment of Chamberlain Way identified in the application functions as a connector roadway and major travel route, rather than a local residential street. The roadway provides through-access between Highway 395 and multiple alternate routes serving broader traffic circulation, and is not limited to serving a defined residential neighborhood. As a result, the project primarily benefits the general motoring public rather than directly benefiting low- and moderateincome residents within a specific service area. CDBG funds may not be used for improvements that serve general community-wide traffic needs or major thoroughfares, and the application does not demonstrate that the proposed improvements are confined to a neighborhood-level street serving residential properties. 0 $ 350,000 No
Not Eligible Projects
277
CITY COUNCIL AGENDA REPORT
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: January 28, 2026
TO: Honorable Mayor and City Council Members
FROM: Jessie Flores, City Manager
BY: Gary Huang, Engineering Manager
SUBJECT: REJECTION OF ALL BIDS FOR THE SENECA ROAD REHABILITATION PROJECT STAFF RECOMMENDATION:
Staff recommends that the City Council reject all bids received for the Seneca Road Rehabilitation Project pursuant to the City’s bid documents and the California Public Contract Code, direct staff to revise the plans and specifications and re-bid the project.
BACKGROUND:
The Seneca Road Rehabilitation Project is intended to rehabilitate existing pavement conditions to improve roadway safety and drivability. The project scope includes asphalt concrete grinding and overlay, localized pavement repairs, and associated roadway improvements. Plans and specifications were prepared by KEC Engineers, Inc. in coordination with City Engineering staff.
A Notice Inviting Bids was issued, and sealed bids were publicly opened on December 9, 2025. Ten (10) bids were received and reviewed for responsiveness and compliance with the contract requirements.
Following bid opening and further engineering evaluation, staff identified the need to modify the plans and specifications. incorporate additional scope and design refinements necessary to address project requirements and field conditions. These revisions represent quantity changes and potentially minor changes to the standards that could reasonably impact bid pricing and competition.
Pursuant to the California Public Contract Code and the City’s bid documents, the City reserves the right to reject any or all bids when it is determined to be in the best interest of the City. Rejecting all bids and rebidding the project with revised plans ensures fairness, transparency, and full and open competition, and avoids the potential risks associated with awarding a contract and subsequently modifying the scope through change orders.
FISCAL IMPACT:
No immediate fiscal impact. The project is anticipated to be funded using SB-1 Rehabilitation Funds, with final costs determined upon rebid.
ATTACHMENTS:
A. Bid Register_Seneca Road Rehabilitation
B. Notice Inviting Bids_Seneca Road Rehabilitation
278
City of Adelanto
Bid Register
I. Name of Project: Seneca Road Rehabilitation Project
Bid Opening Date: December 9, 2025 Time: 3:00 P.M.
Bid No. Company Schedule A Schedule B Total Cost
1 Sully-Miller $ 2,389,250.00
2 All American Asphalt $ 2,489,100.00
3 Hardy & Harper $ 2,298,000.00
4 Vance Corp. $ 2,299,949.00
5 Calmex Eng. $ 2,777,000.00
6 S.Christensen $ 2,324,880.74
7 Toro Enterprise $ 2,755,510.00
8 Aneen Construction $ 3,385,700.00
9 JB Bostick LLC $ 2,995,700.00
10 Onyx Paving $ 2,882,000.00
10 11
12 13
14 Number of Bids Filed by Opening Time: 3:00 p.m. Bids Received By: Title:
Witness:
279
NOTICE INVITING BIDS – Adelanto WWTP Process Improvement Plan
CITY OF ADELANTO
CALIFORNIA
NOTICE INVITING BIDS
I. PROJECT – Seneca Road Pavement Rehabilitation Project II. SEALED BIDS – Notice is hereby given that sealed bids will be received by the Engineering Department of the City of Adelanto at 11600 Air Expressway, Adelanto, CA 92301, until 3:00 p.m. on December 9,2025 for the work to be done as described in the Special Provisions entitled SENECA ROAD PAVEMENT REHABILITATION PROJECT. All bids shall be on the Bid Proposal form provided by the City of Adelanto. Faxed bids are not accepted. The City of Adelanto encourages local contractors/sub-contractors to submit bids for this project and on all future City projects.
III. BOND REQUIREMENTS – Bids must be accompanied by a Bidder's Bond in the form of a certified or cashier's check or a corporate surety bond in an amount not less than ten percent (10%) of the bid amount.
• Prior to execution of the Contract, the successful bidder shall provide one-hundred percent (100%) Faithful Performance and one-hundred percent (100%) Payment bonds based on the bid amount accepted by the City.
IV. PREVAILING RATE OF WAGES - STATE WAGE RATE REQUIREMENT – The Director of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract which will be awarded to the successful bidder, which are available online at http://www.dir.ca.gov/dlsr. A copy of these rates shall be posted by the successful bidder at the job site. The successful bidder and all subcontractor(s) under him shall comply with all applicable Labor Code provisions which include, but are not limited to, the payment of not less than the required prevailing rates to all workers employed by them in the execution of the Contract, the employment of apprentices, the hours of labor and the debarment of contractors and subcontractors.
Pursuant to Labor Code sections 1725.5 and 1771.1 all contractors and subcontractors that wish to bid, be listed in a bid proposal or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractors’ and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on the Project, it shall be the bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its bid.
V. MANDATORY PRE BID MEETING – There will not be a pre-bid conference scheduled for this project.
VI. CONTRACT DOCUMENTS – All bid documents, including exhibits and project locations, are contained within these project specifications, which can be obtained through PlanetBids Vendor Portal.
Documents also posted on City’s website at https://www.ci.adelanto.ca.us.
VII. EVALUATION OF BIDS – The City of Adelanto reserves the right to accept or reject any and all bids and to award a Contract to the bidder who best meets its requirements. Relevant factors that shall be 280
NOTICE INVITING BIDS – Adelanto WWTP Process Improvement Plan
considered in evaluating the bids are: completeness and accuracy of bid; length and nature of warranties; anticipated length of life of materials; as well as the lowest and best price.
VIII. AFFIRMATIVE ACTION – The City of Adelanto hereby notifies all bidders that it will affirmatively ensure that, in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration of award.
IX. CONTRACTOR'S LICENSE – All contractors shall be licensed with Class A in accordance with the laws of this state, and any contractor not so licensed shall be subject to the penalties imposed by such laws.
Contractor shall possess the appropriate license prior to award of Contract. The contractor and subcontractors, prior to start of work, shall obtain a City of Adelanto Business License.
X. DESCRIPTION OF WORK – The purpose of this project is to rehabilitate and restore the existing roadway surface along Seneca Road, improving pavement integrity, safety, and drivability for motorists.
The project will include asphalt concrete overlay, localized pavement dig-outs and repairs, adjustment of utility covers, and new pavement striping and markings in accordance with City of Adelanto Standard Specifications, Caltrans Standard Specifications, and the approved construction drawings.
XII LOCATION OF WORK – This project is located on Seneca Road from HWY 395 to Aster Road.
XIII. BEGINNING OF WORK, TIME OF COMPETION AND LIQUIDATED DAMAGES – The work under this contract shall be diligently prosecuted to completion. Required submittals shall be presented for approval within 10 working days from notice of award. Subsequent re-submittals shall be presented within 5 working days. All materials shall be placed and work completed before expiration of the 45 WORKING DAYS from notice to proceed. The Contractor shall pay the City of Adelanto the sum of $1,000.00 per day for each and every calendar day delay in finishing the work in excess of the contract time period of Forty-Five (45) WORKING DAYS as Liquidated Damages.
IXV. ENGINEERS ESTIMATE – $2,300,000
Dated: November 12, 2025
_________________________________
Brenda Lopez
City Clerk
City of Adelanto
281