490
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water Work Order:
08/27/26 16:33
G26H441
Reported:
Received:
09/08/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
11202 Chapparal Ave G26H441-03 (DW) Sample Date: 08/27/26 6:00 Sampler: Not Listed Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Copper (Cu) EPA 200.7 ND 50 1000 ug/L 09/03/26 09/03/26 2636166 Analysis performed at CLSB; ELAP 1088
Lead (Pb) EPA 200.8 ND 5.0 ug/L 09/03/26 09/03/26 2636176 Analysis performed at CLSB; ELAP 1088
Analyte Method Result Units Prepared Analyzed Batch
14590 Sage Ln G26H441-04 (DW) Sample Date: 08/27/26 7:00 Sampler: Not Listed Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Copper (Cu) EPA 200.7 170 50 1000 ug/L 09/03/26 09/03/26 2636166 Analysis performed at CLSB; ELAP 1088
Lead (Pb) EPA 200.8 ND 5.0 ug/L 09/03/26 09/03/26 2636176 Analysis performed at CLSB; ELAP 1088
Analyte Method Result Units Prepared Analyzed Batch
11331 Dartmouth G26H441-05 (DW) Sample Date: 08/27/26 7:30 Sampler: Not Listed Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Copper (Cu) EPA 200.7 88 50 1000 ug/L 09/03/26 09/03/26 2636166 Analysis performed at CLSB; ELAP 1088
Lead (Pb) EPA 200.8 ND 5.0 ug/L 09/03/26 09/03/26 2636176 Analysis performed at CLSB; ELAP 1088
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
491
492
ADELANTO PUBLIC UTILITY AUTHORITY
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: October 14, 2026
TO: Honorable Chairman, and Public Utility Authority Members FROM: Jessie Flores, Executive Director
BY: Chris McMahon, Woodard & Curran, Area Manager/ Senior Principal SUBJECT: RECEIVE AND FILE THE WATER DEPARTMENT MONTHYLY REPORT – AUGUST 2026
STAFF RECOMMENDATION:
Receive and File the Water Department Monthly Report.
ATTACHMENTS:
1. Water Department Monthly Report – AUGUST 2026
493
Water Department
Monthly Operating Report
August 2026
494
Table of Contents
Section Page No.
1. Executive Summary ……………………………………………………… 1
2. Health & Safety ……………………………………………………… 2
3. Regulatory Compliance ……………………………………………………… 3
4. Water Production & Treatment ……………………………………………………… 4
5. Water Distribution ……………………………………………………… 5
5.1 Customer Service ……………………………………………………… 5
5.2 Water Line Repair ……………………………………………………… 6
6. Maintenance & Repair ……………………………………………………… 7
6.1 Projects ……………………………………………………… 7
7. Personnel ……………………………………………………… 11
8. Budget ……………………………………………………… 12
Attachments:
1. Maintenance History Report
2. Monthly Coliform Report
3. Monthly Blending and Treatment Report
4. Monthly Laboratory Analysis
495
City of Adelanto 1 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
1. Executive Summary
During August 2026, the City of Adelanto Water Department maintained 100% compliance with all state and federal drinking water regulations while delivering approximately 165.68 million gallons of safe and reliable drinking water to the community. The Department completed all required regulatory monitoring with no violations reported and continued to provide responsive customer service through the completion of 230 customer service requests and 212 utility locate requests.
The Department continued advancing key initiatives to improve the reliability and efficiency of the City's water system, including implementation of the Advanced Metering Infrastructure (AMI) program, deployment of the Utility Cloud maintenance management system, preparation for Lead and Copper compliance sampling, validation of AWWA water audits, and planning for the Water Treatment Plant filter media replacement project. These efforts support the City's commitment to regulatory compliance, infrastructure stewardship, operational excellence, and the delivery of high-quality water service to Adelanto residents and businesses.
Compliance Water Supplied Customer Service
100% Compliant 165.680 MG Total
52.980 MG City Sources
230 Work Orders
212 Utility Locates
Operational Highlights
Maintained 100% compliance with Division of Drinking Water requirements. All 40 compliance samples met regulatory standards with no violations or excursions reported. Supplied 165.68 million gallons of drinking water, including 52.98 million gallons from City sources and 112.7 million gallons purchased from Mojave Water Agency. Water Operations and Utility Billing staff continue to work collaboratively to address communication exceptions and verify meter accuracy. Through this process, approximately 1,000 meters were identified for follow-up evaluation due to issues such as failed meter registers, obsolete meter components, or communication deficiencies Safety, Maintenance and Project Focus
Completed Preventing Back Injury training and advanced Startup Safety Audit corrective actions to 78.3% completion.
Continued implementation of Utility Cloud to improve maintenance planning, asset management, and work order tracking. August maintenance activities included 33 preventive maintenance tasks and 3 emergency repairs.
Near-term priorities include AMI exception resolution, storage tank inspections, flow meter calibrations, return of lower booster backup pumps to service, and repair of the Well 1G flow meter.
Financial Summary
Updated budget-to-actual reporting was unavailable because financial data is being migrated, validated, and reconciled during Woodard & Curran’s ERP transition to a new software platform. 496
City of Adelanto 2 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
2. Health & Safety
Monthly Safety Training
As part operations for the City of Adelanto’s drinking water staff receive routine safety training to ensure that they are working safely. This is accomplished through daily safety tailgate meetings, assigned monthly training topics, and topic specific safety stand downs periodically.
Staff has received the following trainings this year as part of the company wide training program:
September 2025: PPE Protocols
October 2025: Fire Extinguisher Safety Awareness
November 2025: Cold Weather Safety
December 2025: Hearing Conservation
January 2026: Hand and Arm Protection
February 2026: Ergonomics
March 2026: Stand Down: Slips, Trips, and Falls
March 2026: Stand Down: Finger Injuries
March 2026: Vehicle Safety Training
April 2026: Machine Guarding
May 2026: Fall Protection Awareness
June 2026: Respiratory Protection
July 2026: Heat Stress Awareness
August 2026: Preventing Back Injury
SPARKS Program Overview
The Woodard & Curran SPARKS Program continued to support a strong safety culture within the Adelanto Water Department during August. Staff completed the monthly Preventing Back Injury training and maintained 100% compliance with SPARKS program requirements. Progress also continued on corrective actions identified during the Startup Safety Audit, supporting ongoing safety improvements and a safe work environment.
Safety Audit
Staff continue to work to resolve identified action items from the Startup Safety Audit. New signage continues to be installed throughout the sites along with correction of many hazards. The goal is to substantially complete the audit action items by December of this year.
78.3% of the 184 action items have been completed to date. 497
City of Adelanto 3 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
3. Regulatory Compliance
During this reporting period, the City of Adelanto has maintained 100% regulatory compliance with the Division of Drinking Water (DDW) in accordance with Permit CA3610001. Samples are collected and submitted for analysis to Geo-Monitor on a weekly basis. Additional sampling reports can be found in the Appendix.
Table 3-1: Distribution Compliance Sampling
Samples Taken Compliant Excursions % Compliant
40 40 0 100
Table 3-2: Treatment Plant Sampling Results (Avg)
August 2026
Analysis MCL Result Violation (Y/N)
Iron 300 ND N
Manganese 50 ND N
Arsenic 10 ND N
Fluoride 2 0.44 N
Table 3-2: Pump House Sampling Results (Avg)
August 2026
Analysis MCL Result Violation (Y/N)
Iron 300 ND N
Manganese 50 ND N
Arsenic 10 ND N
Fluoride 2 0.48 N
Table 3-3: Monthly Water Loss
August 2026
Total Potable Supply Total Potable Demand Difference Estimated Water Loss (gallons)
165,680,000 142,822,407 22,857,593 400,000
Table 3-4: Year to Date Water Loss
Year to Date
Total Potable Supply Total Potable Demand Difference Estimated Water Loss (gallons)
1,084,200,890 931,400,086 152,800,804 9,465,000
498
City of Adelanto 4 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
4. Water Production and Treatment
During this reporting period, the City of Adelanto produced 52.980 million gallons of water from six active wells. One of these wells (8G2) disinfects water at the wellhead prior to transmission to one of six water storage tanks. Four of these wells (1G, 3G, 4G, 8G) send water to the Water Treatment Plant (WTP) to treat iron and manganese. This treatment process consists of Iron and Manganese Filtration. Following treatment for iron and manganese, the WTP’s effluent is blended with water from the other wells and purchased water from Mojave Water Agency and the City of Victorville (as needed) in the City’s water storage tanks and distribution system. In August, 112.700 million gallons were purchased from MWA R3 connection, and 0 million gallons were purchased from the City of Victorville.
During this reporting period (August), the WTP treated 28.44 million gallons of raw water, and all samples were within acceptable ranges for iron, manganese, and other contaminants. In addition to weekly samples sent to Geo Monitor, Woodard & Curran’s staff takes daily samples to maintain process control, and these results are found in Table 4-1.
Table 4-1
499
City of Adelanto 5 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
5. Water Distribution
The City of Adelanto’s water distribution system consists of 6 water storage tanks (21.750 million gallons combined), 3 Pressure Reducing Valves (PRVs), and 180 miles of water mains that serve approximately 38,000 residents and commercial/industrial entities with 8,900 meters. Water is also purchased from MWA to meet the City’s daily water demand, and additional water can be purchased from the City of Victorville (COV) on an as-needed basis. The purchased water connection to MWA and COV is located at 5Mil location. The allocation of the City’s water supply sources for this reporting period can be found in Table 5-1.
Table 5-1: Water Supply Sources
August 2026
Water Supply Source Quantity
City of Adelanto 52.980 MG
Mojave Water Agency 112.700 MG
City of Victorville 0 MG
Total Drinking Water 165.680 MG
5.1 Customer Service
Customer Service remains a critical component of the City of Adelanto’s drinking water operations, serving as the primary point of contact between the utility and its customers. Throughout the reporting period, staff responded to service requests in a timely and professional manner, supporting reliable water service for residents and businesses while maintaining a strong focus on customer satisfaction. Customer 500
City of Adelanto 6 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
service activities can include service inquiries, water quality concerns, meter-related requests, utility locates, service turn-ons and shut-offs, and coordination of field responses to customer-reported issues.
Through effective communication, prompt response times, and collaboration between customer service and field operations personnel, the City continued to deliver responsive and dependable service to the community while supporting the overall reliability of the drinking water system.
Table 5-2: Customer Service & Locates
Customer Service Locates
January 2026 203 273
February 2026 163 234
March 2026 264 241
April 2026 292 215
May 2026 256 322
June 2026 277 402
July 2026 243 325
August 2026 230 212
TOTAL 1,928 2,224
5.2 Water Line Repairs
Contractor Date Site Type
W&C 8-07-26 18040 Concord St Full Service Replacement
W&C 8-07-26 11621 Golden St Full Service Replacement
W&C 8-13-26 19008 Joshua St Service Repair
W&C 8-19-26 11743 Galewood St Full Service Replacement
W&C 8-20-26 16506 Lilac Rd Service Repair
W&C 8-26-26 11778 Dana Dr Full Service Replacement
TK Construction 8-26-26 Sandy Ridge Ct Full Service Replacement
501
City of Adelanto 7 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
6. Maintenance & Repair
Utility Cloud implementation continued during August through development of asset inventories, preventive maintenance programs, workflow configuration, and staff training. Staff also began using the platform to document maintenance activities and validate asset information. Full implementation is expected to improve maintenance tracking and work order management. 502
City of Adelanto 8 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
6.1 Projects
6.1.1 Lead & Copper Compliance Sampling
Status: Customer outreach and sampling preparation underway.
Lead and Copper Compliance Sampling is a critical regulatory requirement that helps ensure the City of Adelanto continues to provide safe and reliable drinking water while maintaining compliance with federal and state drinking water regulations.
The California State Water Resources Control Board requires community water systems to conduct periodic lead and copper monitoring at representative residential and commercial locations throughout the distribution system. Adelanto's monitoring program requires triennial sampling at 30 approved locations to evaluate the potential impact of plumbing materials on drinking water quality.
During August, Woodard & Curran staff initiated outreach to residents and businesses that have previously participated in the sampling program. Maintaining consistent sampling locations from one monitoring event to the next provides reliable trend data and supports long-term assessment of water quality conditions throughout the system.
Lead and Copper samples must be collected by participating customers from a cold-water tap following a minimum six-hour stagnation period with no water use. Once collected, samples are submitted to a certified laboratory for analysis.
Customer notification and sampling instruction materials were prepared and distributed to participating residents and businesses. Upon receipt of laboratory results, the data will be reviewed, compiled, and submitted to the California State Water Resources Control Board along with the required reporting forms and customer notification documentation.
6.1.2 Water Treatment Plant Filter Media Replacement
Status: Material delivery in progress; installation scheduled for November.
The City is currently under contract to replace the filter media at the Iron and Manganese Water Treatment Plant. Filter media replacement is a critical maintenance activity that helps ensure continued treatment efficiency, regulatory compliance, and high-quality drinking water. Over time, filter media can become fouled with accumulated iron, manganese, and other particulates, reducing its effectiveness and overall treatment performance.
During the reporting period, new filter media began arriving on-site in preparation for the project.
Replacement of the existing media is currently scheduled to commence in mid-November. Upon completion, the new media will enhance filtration performance and support the long-term reliability of the treatment process.
503
City of Adelanto 9 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
6.1.3 AWWA Water Loss Audits
Status: Validation underway.
The American Water Works Association (AWWA) Water Audit is an essential tool for evaluating the efficiency and performance of the City’s water distribution system. By accounting for all water produced, delivered, and consumed, the audit helps identify water losses associated with leaks, meter inaccuracies, data management issues, and unauthorized consumption.
Annual water audits provide valuable information to support asset management, prioritize infrastructure improvements, reduce non-revenue water, and enhance overall system reliability. The audit process also supports regulatory compliance, promotes responsible water resource management, and assists the City in operating its water system in a cost-effective and sustainable manner.
Validation of the City’s Calendar Year 2023, 2024, and 2025 AWWA Water Audits is currently underway.
Once completed, the validated audits will provide a more accurate assessment of system performance and help guide future water loss control and operational improvement efforts.
6.1.4 Water Meter Automatic Reading Integration
Status: Integration and communication issue resolution ongoing.
The City continues to make progress with the implementation and optimization of its Advanced Metering Infrastructure (AMI) system. Current efforts are focused on system integration, data validation, and performance optimization to ensure reliable communication between field-installed meter communication units and the City’s utility billing platform.
Water Operations and Utility Billing staff are working collaboratively to identify and resolve communication exceptions, verify meter performance, and improve the accuracy of data transferred between the AMI system and billing software. Through this process, approximately 1,000 meters have been identified for further evaluation due to issues such as failed meter registers, obsolete meter components, or communication deficiencies.
As system integration activities continue, the AMI program is expected to provide significant operational and customer service benefits, including improved billing accuracy, enhanced customer support, faster leak detection, reduced manual meter-reading requirements, and increased overall efficiency across the City’s water utility operations.
Over the coming months, the City and Water Operations staff will remain focused on resolving remaining communication issues, optimizing data integration, and maximizing system performance. These efforts will help ensure the long-term success of the AMI program while fully realizing the benefits of the City’s modernized metering infrastructure, including improved asset management, operational efficiency, and customer service.
6.1.5 Short-Term Rehabilitation Projects
504
City of Adelanto 10 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
Flow meter calibrations to meet compliance requirements Internal inspection of water storage tanks
Lower booster pump station, return backup pumps to service Repair of inoperable flow meter at Well 1G
Well 14A and Well 04G Flood Plain Protection and Well Rehabilitation 505
City of Adelanto 11 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
7. Personnel
The City of Adelanto is supported by seven (7) full-time on-site field staff and an O&M Project Manager.
The team is further supported by Woodard & Curran’s network of technical and administrative professionals, providing additional expertise and resources to support efficient and reliable utility operations.
Onsite Staff
Adam Ambrose – Project Manager
Salvador Ruiz - Lead Operator
Edward Rodriguez – Operator in Training
Samuel Ramirez – Operator in Training
Andres Villagomez – Operator
Eric Cardamone – Operator in Training
Chris Jones – Maintenance Technician
Additional Support Staff
Chris McMahon – Area Manager
Dave Kitzmiller – Operations Leader-Western U.S.
Marc Thomas – National Operations Leader
Anthony Naccarato – Client Services Manager
Adam Shapiro – O&M Technology Implementation Specialist Steve Lindemann – O&M Health & Safety Manager
Kyle McKee – Health & Safety Specialist
Ken Davis – Asset Management Services Manager
506
City of Adelanto 12 Woodard & Curran, Inc.
APUA - Water Department Monthly Report August8 August 2026
8. Budget
Budget tracking for Fiscal Year 2026-2027:
Woodard & Curran is currently undergoing a transition to a new Enterprise Resource Planning (ERP) system that will support financial management, project accounting, invoicing, procurement, and reporting functions across the organization. As part of this implementation, financial data and reporting processes are being migrated, validated, and reconciled within the new system environment.
Due to the ongoing ERP transition, updated financial information is not currently available for inclusion in this month's report. Financial records remain under review as system data is reconciled and reporting functionality is finalized. As a result, comprehensive financial reporting, including budget-to-actual comparisons, expenditure summaries, and other financial metrics, cannot be provided at this time.
Operational and project activities continue to be performed in accordance with contract requirements; however, financial information will remain unavailable until the ERP transition and associated reconciliation efforts have been completed. Woodard & Curran's finance and implementation teams continue to work through the remaining transition activities to ensure the accuracy and integrity of financial data before it is released for reporting purposes.
Financial reporting will resume once validated information becomes available through the new ERP system.
The prior period budget tracker is presented below pending full reconciliation through the new ERP system.
507
Maintenance History Report
Work Orders by Type Total
Preventative Maintenance 22
Corrective Maintenance 11
Emergency Repair 3
Total 36
Report Start: 8/1/2026
Report End: 8/31/2026
Adelanto, CA Water
Top Work Orders by Description
508
Date Asset Name Work Order Description Staff Work Type Status Corrective Maintenance
Corrective Work Order
8/6/2026 ADEL-WME-7742 Broken AMS. Andres Villagomez Corrective Maintenance
Complete
8/4/2026 ADEL-WME-1092 Leak reported by customer service Sal Ruiz Corrective Maintenance
Closed
8/31/2026 LB P3 Submersible Pump Hour timer needs replaced Edward Rodriguez Corrective Maintenance
Complete
8/31/2026 WF WCP-3G2 Control Panel SCADA communication issues need evaluated. Edward Rodriguez Corrective Maintenance
Complete
8/31/2026 WF WCP-3G2 Control Panel Hour timer needs replaced Edward Rodriguez Corrective Maintenance
Complete
8/31/2026 WF 14A Well Control Panel Hour timer needs replaced Edward Rodriguez Corrective Maintenance
Complete
8/31/2026 LB P5 Submersible Pump Hour timer needs replaced Edward Rodriguez Corrective Maintenance
Complete
8/31/2026 WF 4G WCP Control Panel Hour timer needs replaced Edward Rodriguez Corrective Maintenance
Complete
8/31/2026 WP Chemical Feed Eyewash
Station
Needs to be repaired Edward Rodriguez Corrective
Maintenance
Complete
8/31/2026 WF 4G Submersible Pump Packing issues need to be addressed. Chris Jones Corrective Maintenance
Complete
8/31/2026 WF 14A Flow Meter Disconnected? Edward Rodriguez Corrective Maintenance
Complete
Corrective Maintenance Total: 11
Emergency Repair
Corrective Work Order
8/6/2026 ADEL-WME-7738 Broken AMS. Andres Villagomez Emergency Repair Complete 8/10/2026 ADEL-WME-8853 Service leak reported after hours Sal Ruiz Emergency Repair Complete 8/20/2026 ADEL-WME-3208 Operator seen meter box leaking, after investigation, found city side leak deep in the meter box.
Sal Ruiz Emergency Repair Complete
Emergency Repair Total: 3
509
Date Asset Name Work Order Description Staff Work Type Status Preventative Maintenance
Accu-Tab System PM - Weekly
8/25/2026 5M Accu-Tab Chlorinator Capsule
Tank
Weekly Accu-Tab System PM Chris Jones Preventative
Maintenance
Complete
Analyzer PM - Monthly
8/5/2026 WP In-Line Chlorine Analyzer Monthly Analyzer PM Sal Ruiz Preventative Maintenance
Complete
Analyzer PM - Semi-Annual
8/5/2026 WP In-Line Chlorine Analyzer Semi-Annual Analyzer PM Sal Ruiz Preventative Maintenance
Complete
Filter PM - Weekly
8/27/2026 WP Filter 300 Tank Weekly Filter PM Sal Ruiz Preventative Maintenance
Complete
8/20/2026 WP Filter 100 Tank Weekly Filter PM Sal Ruiz Preventative Maintenance
Complete
Grounds PM - Monthly
8/26/2026 WF Grounds Monthly Grounds PM Sal Ruiz Preventative Maintenance
Complete
8/5/2026 750 Grounds Monthly Grounds PM Sal Ruiz Preventative Maintenance
Complete
8/31/2026 5M Grounds Monthly Grounds PM Edward Rodriguez Preventative Maintenance
Complete
8/31/2026 3M Grounds Monthly Grounds PM Edward Rodriguez Preventative Maintenance
Complete
8/31/2026 WF Grounds Monthly Grounds PM Edward Rodriguez Preventative Maintenance
Complete
Housekeeping PM - Monthly
8/31/2026 3M Building Monthly Housekeeping PM Edward Rodriguez Preventative Maintenance
Complete
Monthly Fire Extinguisher Inspection
8/3/2026 WF 4G Fire Extinguisher Monthly Fire Extinguisher Inspection Sal Ruiz Preventative Maintenance
Complete
510
Date Asset Name Work Order Description Staff Work Type Status 8/31/2026 WP Fire Extinguisher MCC Room Monthly Fire Extinguisher Inspection Edward Rodriguez Preventative Maintenance
Complete
Motor PM - Annual
8/31/2026 WF 14A Motor Annual Motor PM Chris Jones Preventative Maintenance
Complete
8/31/2026 WF 8G2 Motor Annual Motor PM Chris Jones Preventative Maintenance
Complete
Vehicle Inspection
8/3/2026 W Chevy Colorado 2 Weekly Vehicle Inspection Andres Villagomez Preventative Maintenance
Complete
8/10/2026 W Chevy Colorado 2 Weekly Vehicle Inspection Andres Villagomez Preventative Maintenance
Complete
8/10/2026 W Chevy Colorado 1 Weekly Vehicle Inspection Edward Rodriguez Preventative Maintenance
Complete
8/12/2026 W 3500 Chevy Silverado Weekly Vehicle Inspection Sal Ruiz Preventative Maintenance
Complete
8/24/2026 W Chevy Colorado 2 Weekly Vehicle Inspection Andres Villagomez Preventative Maintenance
Complete
8/31/2026 W Chevy Colorado 1 Weekly Vehicle Inspection Edward Rodriguez Preventative Maintenance
Complete
Well PM - Monthly
8/31/2026 WF 3G2 Well Head Monthly Well PM Edward Rodriguez Preventative Maintenance
Complete
Preventative Maintenance Total: 22
Report Total: 36
511
State of California -- Health and Human Services Agency Department of Public Health
MONTHLY SUMMARY OF DISTRIBUTION SYSTEM COLIFORM MONITORING Drinking Water Program
(including triggered source monitoring for systems subject to the Groundwater Rule) System Name System Number
Sampling Period
Year
Month
1. Routine Samples (see note 1) 0 0
2. Repeat Samples following Samples that are Total Coliform Positive and Fecal/E.coli Negative (see notes 5 and 6) 0 0
3. Repeat Samples following Routine Samples that are
Total Coliform Positive and Fecal/E.coli Positive
(see notes 5 and 6) 0 0
4. MCL Computation for Total Coliform Positive Samples
a. Totals (sum of columns) 40
b. If 40 or more samples collected in month, determine
percent of samples that are total coliform positive
[(total number positive/total number collected) x 100] = % c. Is system in compliance… …with fecal/E. coli MCL?
(see notes 2 and 3) Yes No
…with monthly MCL? Yes No
(see note 4)
5. Source Samples Triggered by Routine Samples that are Total Coliform Positive 0 0 (This applies only to systems subject to the Groundwater Rule - see notes 7 and 8)
6. Invalidated Samples
(Note what samples, if any, were invalidated; who authorized the invalidation; and when replacement samples were collected. Attach additional sheets, if necessary.)
7. Summary Completed By:
Signature Title Date
NOTES AND INSTRUCTIONS:
1. Routine samples include:
a. Samples required pursuant to 22 CCR Section 64423 and any additional samples required by an approved routine sample siting plan established pursuant to 22 CCR Section 64422. b. Extra samples are required for systems collecting less than five routine samples per month that had one or more total coliform positives in previous month; c. Extra samples for systems with high source water turbidities that are using surface water or groundwater under direct influence of surface water and do not practice filtration in compliance with regulations;
2. Note: For a repeat sample following a total coliform positive sample, any fecal/E.coli positive repeat (boxed entry) constitutes an MCL violation and requires immediate notification to the Department (22, CCR, Section 64426.1).
3. Note: For repeat sample following a fecal/E.coli positive sample, any total coliform positive repeat (boxed entry) constitutes an MCL violation and requires immediate notification to the Department (22, CCR, Section 64426.1).
4. Total coliform MCL (Notify Department within 24 hours of MCL violation):
a. For systems collecting less than 40 samples, if two or more samples are total coliform positive, then the MCL is violated. b. For systems collecting 40 or more samples, if more than 5.0 percent of samples collected are total coliform positive, then the MCL is violated.
5. Positive results and their associated repeat samples are to be tracked on the Coliform Monitoring Worksheet.
6. Repeat samples must be collected within 24 hours of being notified of the positive results. For systems collecting more than one routine sample per month, three repeat samples must be collected for each total coliform positive sample. For systems collecting one or fewer routine samples per month, four repeat samples must be collected for each total coliform positive sample.
7. For systems subject to the Groundwater Rule: Positive results and the associated triggered source samples are to be tracked on the Coliform Monitoring Worksheet.
8. For triggered sample(s) required as a result of a total coliform routine positive sample, an E.coli, enterococci, or coliphage positive triggered sample (boxed entry) requires immediate notification to the Department, Tier 1 public notification, and corrective action. 10/2009 - 8477 0 0
August 2026
Number Total
Coliform Positives
40 0
Area Manager 9/10/2026
City of Adelanto CA3610001
0 40
Number
Collected
Number
Required
40 Number Fecal/
E.coli Positives
512
CITY OF ADELANTO Adelanto Iron and Manganese Filtration Plant Operated by: Woodard & Curran SYSTEM NUMBER: CA3610001
Plant Status Filter Influent
Date
Online/Offline Free CL2
Residual (Daily)
Turbidity,
NTU (Daily)
Treated
Water
Reservoir
CL2
Iron, ug/L
(Weekly)
Manganese,
ug/L
(Weekly)
Total
Coliforms
(Monthly)
HPC
(Monthly)
8/1/2026 Online 0.15 0.11 2.08
8/2/2026 Online 0.17 0.08 1.85
8/3/2026 Online 0.09 0.15 1.19
8/4/2026 Online 0.08 0.09 1.02 ND ND Absent ND
8/5/2026 Online 0.09 0.11 1.23
8/6/2026 Online 0.08 0.10 1.37
8/7/2026 Online 0.08 0.07 1.56
8/8/2026 Online 0.01 0.07 1.15
8/9/2026 Online 0.08 0.16 1.53
8/10/2026 Online 0.09 0.17 1.59
8/11/2026 Online 0.05 0.10 1.13 ND ND Absent ND
8/12/2026 Online 0.04 0.09 1.20
8/13/2026 Online 0.06 0.08 1.65
8/14/2026 Online 0.05 0.12 1.82
8/15/2026 Online 0.16 0.11 1.93
8/16/2026 Online 0.04 0.19 1.68
8/17/2026 Online 0.07 0.06 1.78
8/18/2026 Online 0.07 0.08 1.91 ND ND Absent ND
8/19/2026 Online 0.08 0.10 1.30
8/20/2026 Online 0.12 0.10 1.59
8/21/2026 Online 0.15 0.14 1.58
8/22/2026 Online 0.11 0.10 1.38
8/23/2026 Online 0.07 0.35 1.40
8/24/2026 Online 0.05 0.12 1.59
8/25/2026 Offline 0.05 0.07 1.88
8/26/2026 Offline 0.12 0.16 1.25 ND ND Absent ND
8/27/2026 Online 0.05 0.09 2.00
8/28/2026 Online 0.06 0.18 2.05
8/29/2026 Online 0.02 0.15 2.01
8/30/2026 Online 0.01 0.10 1.90
8/31/2026 Online 0.06 0.07 1.91
Filter Effluent (3610001-021)
Notes
513
CITY OF ADELANTO Adelanto Iron and Manganese Filtration Plant Operatored by: Woodard & Curran SYSTEM NUMBER: CA3610001
Location Date HPC
Well 1G Offline all month
Well 3G2 8/18/2026 2
Well 4G 8/18/2026 ND
Well 8G2 8/18/2026 ND
Absent
3610001-013
Notes
3610001-022
Status (Online/Offline) Total Coliforms (P or A)
Online
Online
Online
Online
3610001-016
3610001-021
Offline
Absent
Absent
514
State of California - State Water Resource Control Board Division of Drinking Water Programs Water System Name: City of Adelanto System Number: CA360001 Month/Year: Aug-26 Facility Name : 0.75 Mil Reservoir Blending Facility Consituent Blended: Fluoride MCL 2 mg/L Quantity of
Water (gpd)
Conc.
(mg/L) A x B =
Quantity of
Water (gpd)
Conc.
(mg/L) D x E =
Quantity of
Water (gpd)
Conc.
(mg/L) G x H =
Quantity of
Water (gpd)
Conc.
(mg/L) J x K = C+F+I+L= A+D+G+J=
A B C D E F G H I J K L M N
1 0 0 614 0.50 307 0 0 1077000 0.44 473880 474187 1077614 0.44 2 0 0 614 0.50 307 0 0 1077000 0.44 473880 474187 1077614 0.44 3 0 0 614 0.50 307 0 0 1077000 0.44 473880 474187 1077614 0.44 4 0 0 534 0.50 267 0 0 1034000 0.44 454960 455227 1034534 0.44 0.44 5 0 0 589 0.50 295 0 0 755000 0.44 332200 332495 755589 0.44 6 0 0 609 0.50 305 0 0 1122000 0.44 493680 493985 1122609 0.44 7 0 0 507 0.50 254 0 0 865000 0.44 380600 380854 865507 0.44 8 0 0 617 0.50 309 0 0 1098000 0.44 483120 483429 1098617 0.44 9 0 0 602 0.50 301 0 0 944000 0.44 415360 415661 944602 0.44 10 0 0 633 0.50 317 0 0 1103000 0.44 485320 485637 1103633 0.44 11 0 0 620 0.50 310 0 0 1203000 0.44 529320 529630 1203620 0.44 0.48 12 0 0 702 0.50 351 0 0 898000 0.44 395120 395471 898702 0.44 13 0 0 551 0.50 276 0 0 903000 0.44 397320 397596 903551 0.44 14 0 0 674 0.50 337 0 0 1168000 0.44 513920 514257 1168674 0.44 15 0 0 400 0.50 200 0 0 706000 0.44 310640 310840 706400 0.44 16 0 0 656 0.50 328 0 0 1035000 0.44 455400 455728 1035656 0.44 17 0 0 596 0.50 298 0 0 1019000 0.44 448360 448658 1019596 0.44 18 0 0 618 0.50 309 0 0 871000 0.44 383240 383549 871618 0.44 0.41 19 0 0 717 0.50 359 0 0 1178000 0.44 518320 518679 1178717 0.44 20 0 0 474 0.50 237 0 0 784000 0.44 344960 345197 784474 0.44 21 0 0 610 0.50 305 0 0 954000 0.44 419760 420065 954610 0.44 22 0 0 606 0.50 303 0 0 955000 0.44 420200 420503 955606 0.44 23 0 0 596 0.50 298 0 0 936000 0.44 411840 412138 936596 0.44 24 0 0 606 0.50 303 0 0 942000 0.44 414480 414783 942606 0.44 25 0 0 560 0.50 280 0 0 924000 0.44 406560 406840 924560 0.44 0.44 26 0 0 719 0.50 360 0 0 1117000 0.44 491480 491840 1117719 0.44 27 0 0 658 0.50 329 0 0 838000 0.44 368720 369049 838658 0.44 28 0 0 403 0.50 202 0 0 855000 0.44 376200 376402 855403 0.44 29 0 0 605 0.50 303 0 0 920000 0.44 404800 405103 920605 0.44 30 0 0 639 0.50 320 0 0 1028000 0.44 452320 452640 1028639 0.44 31 0 0 580 0.50 290 0 0 889000 0.44 391160 391450 889580 0.44 ND = Non Detect
Blank Cell = No Sample
Lab Result
(mg/L) @
Front Pump
House Day
M / N =
(mg/L)
MONTHLY BLENDING RECORD
Theoretical Concentration in Blended
Soure 1: Well 4 Soure 2: Well 14A Soure 3: Well 5A Soure 4: Treatment Plant Effluent Water from Sources 1, 2, 3, & 4 515
State of California - State Water Resource Control Board Division of Drinking Water Programs Water System Name: City of Adelanto System Number: CA360001 Month/Year: Aug-26 Facility Name : 0.75 Mil Reservoir Blending Facility Consituent Blended: Arsenic MCL 0.01 mg/L Quantity of
Water (gpd)
Conc.
(mg/L) A x B =
Quantity of
Water (gpd)
Conc.
(mg/L) D x E =
Quantity of
Water (gpd)
Conc.
(mg/L) G x H =
Quantity of
Water (gpd)
Conc.
(mg/L) J x K = C+F+I+L= A+D+G+J=
A B C D E F G H I J K L M N
1 0 0 614 ND 0 0 0 1077000 ND 0 0 1077614 0
2 0 0 614 ND 0 0 0 1077000 ND 0 0 1077614 0
3 0 0 614 ND 0 0 0 1077000 ND 0 0 1077614 0
4 0 0 534 ND 0 0 0 1034000 ND 0 0 1034534 0 ND
5 0 0 589 ND 0 0 0 755000 ND 0 0 755589 0
6 0 0 609 ND 0 0 0 1122000 ND 0 0 1122609 0
7 0 0 507 ND 0 0 0 865000 ND 0 0 865507 0
8 0 0 617 ND 0 0 0 1098000 ND 0 0 1098617 0
9 0 0 602 ND 0 0 0 944000 ND 0 0 944602 0
10 0 0 633 ND 0 0 0 1103000 ND 0 0 1103633 0
11 0 0 620 ND 0 0 0 1203000 ND 0 0 1203620 0 ND
12 0 0 702 ND 0 0 0 898000 ND 0 0 898702 0
13 0 0 551 ND 0 0 0 903000 ND 0 0 903551 0
14 0 0 674 ND 0 0 0 1168000 ND 0 0 1168674 0
15 0 0 400 ND 0 0 0 706000 ND 0 0 706400 0
16 0 0 656 ND 0 0 0 1035000 ND 0 0 1035656 0
17 0 0 596 ND 0 0 0 1019000 ND 0 0 1019596 0
18 0 0 618 ND 0 0 0 871000 ND 0 0 871618 0 ND
19 0 0 717 ND 0 0 0 1178000 ND 0 0 1178717 0
20 0 0 474 ND 0 0 0 784000 ND 0 0 784474 0
21 0 0 610 ND 0 0 0 954000 ND 0 0 954610 0
22 0 0 606 ND 0 0 0 955000 ND 0 0 955606 0
23 0 0 596 ND 0 0 0 936000 ND 0 0 936596 0
24 0 0 606 ND 0 0 0 942000 ND 0 0 942606 0
25 0 0 560 ND 0 0 0 924000 ND 0 0 924560 0 ND
26 0 0 719 ND 0 0 0 1117000 ND 0 0 1117719 0
27 0 0 658 ND 0 0 0 838000 ND 0 0 838658 0
28 0 0 403 ND 0 0 0 855000 ND 0 0 855403 0
29 0 0 605 ND 0 0 0 920000 ND 0 0 920605 0
30 0 0 639 ND 0 0 0 1028000 ND 0 0 1028639 0
31 0 0 580 ND 0 0 0 889000 ND 0 0 889580 0
ND = Non Detect
Blank Cell = No Sample
MONTHLY BLENDING RECORD Day
Soure 1: Well 4 Soure 2: Well 14A Soure 3: Well 5A Soure 4: Treatment Plant Effluent Theoretical Concentration in Blended Lab Result
(mg/L) @
Front Pump
House
M / N =
(mg/L)
516
State of California - State Water Resource Control Board Division of Drinking Water Programs Water System Name: City of Adelanto System Number: CA360001 Month/Year: Aug-26 Facility Name : 0.75 Mil Reservoir Blending Facility Consituent Blended: Iron MCL 0.30 mg/L Quantity of
Water (gpd)
Conc.
(mg/L) A x B =
Quantity of
Water (gpd)
Conc.
(mg/L) D x E =
Quantity of
Water (gpd)
Conc.
(mg/L) G x H =
Quantity of
Water (gpd)
Conc.
(mg/L) J x K = C+F+I+L= A+D+G+J=
A B C D E F G H I J K L M N
1 0 0 614 ND 0 0 0 1077000 ND 0 0 1077614 0
2 0 0 614 ND 0 0 0 1077000 ND 0 0 1077614 0
3 0 0 614 ND 0 0 0 1077000 ND 0 0 1077614 0
4 0 0 534 ND 0 0 0 1034000 ND 0 0 1034534 0 ND
5 0 0 589 ND 0 0 0 755000 ND 0 0 755589 0
6 0 0 609 ND 0 0 0 1122000 ND 0 0 1122609 0
7 0 0 507 ND 0 0 0 865000 ND 0 0 865507 0
8 0 0 617 ND 0 0 0 1098000 ND 0 0 1098617 0
9 0 0 602 ND 0 0 0 944000 ND 0 0 944602 0
10 0 0 633 ND 0 0 0 1103000 ND 0 0 1103633 0
11 0 0 620 ND 0 0 0 1203000 ND 0 0 1203620 0 ND
12 0 0 702 ND 0 0 0 898000 ND 0 0 898702 0
13 0 0 551 ND 0 0 0 903000 ND 0 0 903551 0
14 0 0 674 ND 0 0 0 1168000 ND 0 0 1168674 0
15 0 0 400 ND 0 0 0 706000 ND 0 0 706400 0
16 0 0 656 ND 0 0 0 1035000 ND 0 0 1035656 0
17 0 0 596 ND 0 0 0 1019000 ND 0 0 1019596 0
18 0 0 618 ND 0 0 0 871000 ND 0 0 871618 0 ND
19 0 0 717 ND 0 0 0 1178000 ND 0 0 1178717 0
20 0 0 474 ND 0 0 0 784000 ND 0 0 784474 0
21 0 0 610 ND 0 0 0 954000 ND 0 0 954610 0
22 0 0 606 ND 0 0 0 955000 ND 0 0 955606 0
23 0 0 596 ND 0 0 0 936000 ND 0 0 936596 0
24 0 0 606 ND 0 0 0 942000 ND 0 0 942606 0
25 0 0 560 ND 0 0 0 924000 ND 0 0 924560 0 ND
26 0 0 719 ND 0 0 0 1117000 ND 0 0 1117719 0
27 0 0 658 ND 0 0 0 838000 ND 0 0 838658 0
28 0 0 403 ND 0 0 0 855000 ND 0 0 855403 0
29 0 0 605 ND 0 0 0 920000 ND 0 0 920605 0
30 0 0 639 ND 0 0 0 1028000 ND 0 0 1028639 0
31 0 0 580 ND 0 0 0 889000 ND 0 0 889580 0
ND = Non Detect
Blank Cell = No Sample
Lab Result
(mg/L) @
Front Pump
House
M / N =
(mg/L)
MONTHLY BLENDING RECORD Day
Soure 1: Well 4 Soure 2: Well 14A Soure 3: Well 5A Soure 4: Treatment Plant Effluent Theoretical Concentration in Blended 517
State of California - State Water Resource Control Board Division of Drinking Water Programs Water System Name: City of Adelanto System Number: CA360001 Month/Year: Aug-26 Facility Name : 0.75 Mil Reservoir Blending Facility Consituent Blended: Manganese MCL 0.05 mg/L Quantity of
Water (gpd)
Conc.
(mg/L) A x B =
Quantity of
Water (gpd)
Conc.
(mg/L) D x E =
Quantity of
Water (gpd)
Conc.
(mg/L) G x H =
Quantity of
Water (gpd)
Conc.
(mg/L) J x K = C+F+I+L= A+D+G+J=
A B C D E F G H I J K L M N
1 0 0 614 0.66 405.24 0 0 1077000 ND 0 405.24 1077614 0.000 2 0 0 614 0.66 405.24 0 0 1077000 ND 0 405.24 1077614 0.000 3 0 0 614 0.66 405.24 0 0 1077000 ND 0 405.24 1077614 0.000 4 0 0 534 0.66 352.44 0 0 1034000 ND 0 352.44 1034534 0.000 ND 5 0 0 589 0.66 388.74 0 0 755000 ND 0 388.74 755589 0.001 6 0 0 609 0.66 401.94 0 0 1122000 ND 0 401.94 1122609 0.000 7 0 0 507 0.66 334.62 0 0 865000 ND 0 334.62 865507 0.000 8 0 0 617 0.66 407.22 0 0 1098000 ND 0 407.22 1098617 0.000 9 0 0 602 0.66 397.32 0 0 944000 ND 0 397.32 944602 0.000 10 0 0 633 0.66 417.78 0 0 1103000 ND 0 417.78 1103633 0.000 11 0 0 620 0.66 409.2 0 0 1203000 ND 0 409.2 1203620 0.000 ND 12 0 0 702 0.66 463.32 0 0 898000 ND 0 463.32 898702 0.001 13 0 0 551 0.66 363.66 0 0 903000 ND 0 363.66 903551 0.000 14 0 0 674 0.66 444.84 0 0 1168000 ND 0 444.84 1168674 0.000 15 0 0 400 0.66 264 0 0 706000 ND 0 264 706400 0.000
16 0 0 656 0.66 432.96 0 0 1035000 ND 0 432.96 1035656 0.000 17 0 0 596 0.66 393.36 0 0 1019000 ND 0 393.36 1019596 0.000 18 0 0 618 0.66 407.88 0 0 871000 ND 0 407.88 871618 0.000 ND 19 0 0 717 0.66 473.22 0 0 1178000 ND 0 473.22 1178717 0.000 20 0 0 474 0.66 312.84 0 0 784000 ND 0 312.84 784474 0.000 21 0 0 610 0.66 402.6 0 0 954000 ND 0 402.6 954610 0.000 22 0 0 606 0.66 399.96 0 0 955000 ND 0 399.96 955606 0.000 23 0 0 596 0.66 393.36 0 0 936000 ND 0 393.36 936596 0.000 24 0 0 606 0.66 399.96 0 0 942000 ND 0 399.96 942606 0.000 25 0 0 560 0.66 369.6 0 0 924000 ND 0 369.6 924560 0.000 ND 26 0 0 719 0.66 474.54 0 0 1117000 ND 0 474.54 1117719 0.000 27 0 0 658 0.66 434.28 0 0 838000 ND 0 434.28 838658 0.001 28 0 0 403 0.66 265.98 0 0 855000 ND 0 265.98 855403 0.000 29 0 0 605 0.66 399.3 0 0 920000 ND 0 399.3 920605 0.000 30 0 0 639 0.66 421.74 0 0 1028000 ND 0 421.74 1028639 0.000 31 0 0 580 0.66 382.8 0 0 889000 ND 0 382.8 889580 0.000 ND = Non Detect
Blank Cell = No Sample
MONTHLY BLENDING RECORD Day
Soure 1: Well 4 Soure 2: Well 14A Soure 3: Well 5A Soure 4: Treatment Plant Effluent Theoretical Concentration in Blended Lab Result
(mg/L) @
Front Pump
House
M / N =
(mg/L)
518
State of California - State Water Resource Control Board Division of Drinking Water Programs Water System Name: City of Adelanto
Monthly Results
Booster 1 Booster 2 Booster 3 Well 4 ug/L mg/L INACTIVE 1 0 614 0 0 1077 0 Fluoride INACTIVE
2 0 614 0 0 1077 0 Arsenic INACTIVE
3 0 614 0 0 1077 0 Iron INACTIVE
4 0 534 0 0 1034 0 Manganese INACTIVE
5 0 589 0 0 755 0
6 0 609 0 0 1122 0 Well 14A ug/L mg/L
7 0 507 0 0 865 0 Fluoride 0.5
8 0 617 0 0 1098 0 Arsenic ND
9 0 602 0 0 944 0 Iron ND
10 0 633 0 0 1103 0 Manganese 56
11 0 620 0 0 1203 0
12 0 702 0 0 898 0 Well 5A ug/L mg/L INACTIVE
13 0 551 0 565 338 0 Fluoride INACTIVE
14 0 674 0 1168 0 0 Arsenic INACTIVE
15 0 400 0 706 0 0 Iron INACTIVE
16 0 656 0 1035 0 0 Manganese INACTIVE
17 0 596 0 1019 0 0
18 0 618 0 871 0 0 WTP ug/L mg/L
19 0 717 0 1178 0 0 Fluoride 0.44
20 0 474 0 784 0 0 Arsenic ND
21 0 610 0 954 0 0 Iron ND
22 0 606 0 955 0 0 Manganese ND
23 0 596 0 936 0 0
24 0 606 0 942 0 0
25 0 560 0 924 0 0
26 0 719 0 1117 0 0
27 0 658 0 838 0 0
28 0 403 0 855 0 0
29 0 605 0 920 0 0
30 0 639 0 1028 0 0
31 0 580 0 889 0 0
Aug-26
Well 5A
(Kgal)
Well 14A
(Kgal)
Well 4
(Kgal)
Treatment Plant Effluent
519
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
18 August 2026
Sincerely,
Geo-Monitor No.: G26H076
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/04/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Week 1- I&M Treatment Plant
520
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 1- I&M Treatment Plant
Work Order:
08/04/26 15:35
G26H076
Reported:
Received:
08/18/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H076-01 (Water) Sample Date: 08/04/26 8:51 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 2.1 mg/L 08/04/26 08/04/26 2632040 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/04/26 08/06/26 2632044 Geo-Monitor Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H076-02 (Water) Sample Date: 08/04/26 9:13 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.44 0.10 2 mg/L 08/10/26 08/10/26 2632238 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/14/26 08/14/26 2633295 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.98 mg/L 08/04/26 08/04/26 2632040 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044
Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
521
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 1- I&M Treatment Plant
Work Order:
08/04/26 15:35
G26H076
Reported:
Received:
08/18/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H076-02 (Water) Sample Date: 08/04/26 9:13 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Microbiology Analyses
Plate Count SM9215B ND 1 500 CFU/ml 08/04/26 08/06/26 2632044 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
522
523
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
25 August 2026
Sincerely,
Geo-Monitor No.: G26H174
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/11/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Week 3 - I&M Treatment Plant
524
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 3 - I&M Treatment Plant
Work Order:
08/11/26 15:18
G26H174
Reported:
Received:
08/25/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H174-01 (DW) Sample Date: 08/11/26 9:25 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 1.15 mg/L 08/11/26 08/11/26 2633053 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/11/26 08/13/26 2633042 Geo-Monitor Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H174-02 (DW) Sample Date: 08/11/26 9:51 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.48 0.10 2 mg/L 08/14/26 08/14/26 2633266 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/20/26 08/20/26 2634206 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.44 mg/L 08/11/26 08/11/26 2633053 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042
Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
525
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 3 - I&M Treatment Plant
Work Order:
08/11/26 15:18
G26H174
Reported:
Received:
08/25/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H174-02 (DW) Sample Date: 08/11/26 9:51 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Microbiology Analyses
Plate Count SM9215B ND 1 500 CFU/ml 08/11/26 08/13/26 2633042 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
526
527
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
01 September 2026
Sincerely,
Geo-Monitor No.: G26H284
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/18/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Monthly - I&M Treatment Plant
528
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - I&M Treatment Plant
Work Order:
08/18/26 15:23
G26H284
Reported:
Received:
09/01/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H284-01 (Water) Sample Date: 08/18/26 9:24 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.44 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 1.91 mg/L 08/18/26 08/18/26 2634035 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634043 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
529
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - I&M Treatment Plant
Work Order:
08/18/26 15:23
G26H284
Reported:
Received:
09/01/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H284-02 (Water) Sample Date: 08/18/26 10:15 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.41 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.54 mg/L 08/18/26 08/18/26 2634035 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634043 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
530
531
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
02 September 2026
Sincerely,
Geo-Monitor No.: G26H397
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/25/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Week 4 - I&M Treatment Plant
532
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 4 - I&M Treatment Plant
Work Order:
08/25/26 15:40
G26H397
Reported:
Received:
09/02/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H397-01 (DW) Sample Date: 08/25/26 9:23 Sampler: Edward Rodriguez Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Iron (Fe) EPA 200.7 ND 100 300 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 1.61 mg/L 08/25/26 08/25/26 2635037 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/25/26 08/27/26 2635042 Geo-Monitor Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H397-02 (DW) Sample Date: 08/25/26 10:03 Sampler: Edward Rodriguez Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.44 0.10 2 mg/L 08/27/26 08/27/26 2635195 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 09/01/26 09/01/26 2636080 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.5 mg/L 08/25/26 08/25/26 2635037 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056
Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
533
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 4 - I&M Treatment Plant
Work Order:
08/25/26 15:40
G26H397
Reported:
Received:
09/02/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H397-02 (DW) Sample Date: 08/25/26 10:03 Sampler: Edward Rodriguez Rep. Limit MCL Qualifier
Microbiology Analyses
Plate Count SM9215B ND 1 500 CFU/ml 08/25/26 08/27/26 2635042 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
534
535
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
31 August 2026
Sincerely,
Geo-Monitor No.: G26H285
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/18/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Monthly - Wells
536
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 3G2 G26H285-01 (Water) Sample Date: 08/18/26 9:55 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.54 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 2.4 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 880 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 41 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.01 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B 2 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
537
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 4G G26H285-02 (Water) Sample Date: 08/18/26 9:34 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.47 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 40 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.02 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
538
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 8G2 G26H285-03 (Water) Sample Date: 08/18/26 9:48 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.33 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 630 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.31 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
539
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 14A G26H285-04 (Water) Sample Date: 08/18/26 9:41 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.50 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 56 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.01 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B 8 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
540
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 15 G26H285-05 (Water) Sample Date: 08/18/26 8:47 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.40 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 3.8 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.01 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B 8 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
541
542
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Week 1 Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
Adelanto Water
Chris Mcmahon
CA3610001
08/04/2026
Edward Rodriguez
08/04/2026 15:35
08/10/2026
RESULTS
Laboratory
ID
Sample
Location
Sample
Time
E. Coli
P/A
Total Coliform
P/A
Cl Res (Field)
mg/L
Plate Count
CFU/ml
G26H079-01 08:31 11815 Hardy Ave 0.73 A A <1
G26H079-02 08:55 10518 Chevron 0.75 A A <1
G26H079-03 09:14 10407 Vintage 0.55 A A <1
G26H079-04 09:47 9351 Industrial 0.30 A A <1
G26H079-05 10:12 15620 Joshua Road (High School) 0.40 A A <1 G26H079-06 10:36 10850 Rose Place 0.38 A A <1
G26H079-07 10:58 14283 Ivy St 0.41 A A <1
G26H079-08 11:17 14202 Sandy Ridge Ct 0.40 A A 1
G26H079-09 11:29 11688 Begonia Rd 0.35 A A <1
G26H079-10 11:55 11771 Dana Dr 0.37 A A 1
A - Absence of Bacteria
P - Presence of Bacteria
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 1 of 3 Kristal Escobar
Laboratory Supervisor
543
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Week 1 Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
Adelanto Water
Chris Mcmahon
CA3610001
08/04/2026
Edward Rodriguez
08/04/2026 15:35
08/10/2026
Result Analyte Method Units Prepared Analyzed Batch
10407 Vintage G26H079-03 (Water) Sample Date: 08/04/26 9:14 Sampler: Edward Rodriguez Rep. Limit Qualifier
Field Analyses
Cl Res Free (Field) Field 0.55 mg/L 08/04/26 08/04/26 2632043 General Physical Analyses
Apparent Color SM 2120BM <3.0 Color Units 3.0 08/04/26 08/05/26 2632039 Odor Threshold EPA 140.1-M 1 1 TON 08/04/26 08/05/26 2632039 Turbidity EPA 180.1 <0.1 NTU 0.10 08/04/26 08/05/26 2632039 P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 2 of 3 Kristal Escobar
Laboratory Supervisor
544
545
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Week 3 Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
Adelanto Water
Chris Mcmahon
CA3610001
08/11/2026
Edward Rodriguez
08/11/2026 15:20
08/14/2026
RESULTS
Laboratory
ID
Sample
Location
Sample
Time
E. Coli
P/A
Total Coliform
P/A
Cl Res (Field)
mg/L
Plate Count
CFU/ml
G26H173-01 08:08 12070 Chamberlain 0.36 A A <1 [1]
G26H173-02 08:31 17900 Jonathan 0.42 A A <1 [1]
G26H173-03 08:57 10176 Kemper 0.52 A A <1 [1]
G26H173-04 09:34 14277 Nicoles Way 0.25 A A <1
G26H173-05 09:55 11579 Villa St 0.26 A A <1
G26H173-06 10:17 14984 Huntington St 0.26 A A <1
G26H173-07 10:44 15083 Arcadian St 0.23 A A <1
G26H173-08 11:01 11747 Cloverlawn 0.26 A A <1
G26H173-09 11:29 16880 Sportsmen Center Dr 0.43 A A 1
G26H173-10 11:55 12191 Violet Rd 0.45 A A <1
A - Absence of Bacteria
P - Presence of Bacteria
[1] HT-08 Analysis performed outside of recommended 8 hour hold time but within required 24 hour hold time.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 1 of 3 Kristal Escobar
Laboratory Supervisor
546
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Week 3 Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
Adelanto Water
Chris Mcmahon
CA3610001
08/11/2026
Edward Rodriguez
08/11/2026 15:20
08/14/2026
Result Analyte Method Units Prepared Analyzed Batch
11579 Villa St G26H173-05 (DW) Sample Date: 08/11/26 9:55 Sampler: Edward Rodriguez Rep. Limit Qualifier
Field Analyses
Cl Res Free (Field) Field 0.26 mg/L 08/11/26 08/11/26 2633030 General Physical Analyses
Apparent Color SM 2120BM <3.0 Color Units 3.0 08/11/26 08/11/26 2633031 Odor Threshold EPA 140.1-M 1 1 TON 08/11/26 08/11/26 2633031 Turbidity EPA 180.1 <0.1 NTU 0.10 08/11/26 08/11/26 2633031 P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 2 of 3 Kristal Escobar
Laboratory Supervisor
547
548
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Monthly - Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
Adelanto Water
Chris Mcmahon
CA3610001
08/18/2026
Andres Villagomez
08/18/2026 15:40
08/25/2026
RESULTS
Laboratory
ID
Sample
Location
Sample
Time
E. Coli
P/A
Total Coliform
P/A
Cl Res (Field)
mg/L
Plate Count
CFU/ml
G26H283-01 08:42 17909 Adelanto Rd 0.72 A A <1
G26H283-02 09:10 11206 Chaparral Rd 0.44 A A <1
G26H283-03 09:34 18288 Larkspur Rd 0.65 A A 1
G26H283-04 09:52 10422 Pony Express 0.42 A A <1
G26H283-05 10:15 19039 Muskrat Ave 0.46 A A <1
G26H283-06 10:35 9875 Yucca 0.31 A A 1
G26H283-07 10:52 15137 Ivy Ct 0.35 A A 1
G26H283-08 11:17 11156 Blue Mesa Ave 0.38 A A <1
G26H283-09 11:40 14571 Palo Verde Ct 0.41 A A <1
G26H283-10 12:10 11099 Star St 0.42 A A <1
A - Absence of Bacteria
P - Presence of Bacteria
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 1 of 3 Kristal Escobar
Laboratory Supervisor
549
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Monthly - Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
Adelanto Water
Chris Mcmahon
CA3610001
08/18/2026
Andres Villagomez
08/18/2026 15:40
08/25/2026
Result Analyte Method Units Prepared Analyzed Batch
11099 Star St G26H283-10 (Water) Sample Date: 08/18/26 12:10 Sampler: Andres Villagomez Rep. Limit Qualifier
Field Analyses
Cl Res Free (Field) Field 0.42 mg/L 08/18/26 08/18/26 2634034 General Physical Analyses
Apparent Color SM 2120BM <3.0 Color Units 3.0 08/19/26 08/19/26 2635002 Odor Threshold EPA 140.1-M 1 1 TON 08/19/26 08/19/26 2635002 Turbidity EPA 180.1 <0.1 NTU 0.10 08/19/26 08/19/26 2635002 P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 2 of 3 Kristal Escobar
Laboratory Supervisor
550
551
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Week 4 Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
W&C Adelanto Water Weekly
Chris Mcmahon
3610001
08/25/2026
Samuel Ramirez
08/25/2026 15:40
08/31/2026
RESULTS
Laboratory
ID
Sample
Location
Sample
Time
E. Coli
P/A
Total Coliform
P/A
Cl Res (Field)
mg/L
Plate Count
CFU/ml
G26H396-01 12:48 11000 Cortez Ave 0.38 A A <1
G26H396-02 09:10 10518 Chevron 0.37 A A <1
G26H396-03 09:31 9957 Payne 0.30 A A <1
G26H396-04 09:54 17451-2 Raccoon Ave 0.38 A A <1
G26H396-05 10:10 9351 Industrial 0.41 A A <1
G26H396-06 10:26 10850 Rose Place 0.40 A A <1
G26H396-07 10:44 10814 Pemberton 0.55 A A <1
G26H396-08 11:06 10668 Thorndale 0.42 A A <1
G26H396-09 11:20 14283 Ivy St 0.43 A A <1
G26H396-10 11:45 10982 Wilson Ave 0.46 A A <1
A - Absence of Bacteria
P - Presence of Bacteria
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 1 of 3 Kristal Escobar
Laboratory Supervisor
552
Geo-Monitor, Inc.
Project:
Client:
Reported:
Received:
Sampled:
Sampler:
Sub Project: Week 4 Distribution System
11780 Air Expressway
Adelanto CA, 92301
System:
Fax:
Phone:
Contact:
(620) 474-7310
Woodard & Curran - Adelanto Water
W&C Adelanto Water Weekly
Chris Mcmahon
3610001
08/25/2026
Samuel Ramirez
08/25/2026 15:40
08/31/2026
Result Analyte Method Units Prepared Analyzed Batch
11000 Cortez Ave G26H396-01 (DW) Sample Date: 08/25/26 12:48 Sampler: Samuel Ramirez Rep. Limit Qualifier
Field Analyses
Cl Res Free (Field) Field 0.38 mg/L 08/25/26 08/25/26 2635036 General Physical Analyses
Apparent Color SM 2120BM <3.0 Color Units 3.0 08/25/26 08/25/26 2635041 Odor Threshold EPA 140.1-M 1 1 TON 08/25/26 08/25/26 2635041 Turbidity EPA 180.1 0.10 0.10 NTU 08/25/26 08/25/26 2635041 P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691 Page 2 of 3 Kristal Escobar
Laboratory Supervisor
553
554
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
18 August 2026
Sincerely,
Geo-Monitor No.: G26H076
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/04/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Week 1- I&M Treatment Plant
555
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 1- I&M Treatment Plant
Work Order:
08/04/26 15:35
G26H076
Reported:
Received:
08/18/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H076-01 (Water) Sample Date: 08/04/26 8:51 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 2.1 mg/L 08/04/26 08/04/26 2632040 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/04/26 08/06/26 2632044 Geo-Monitor Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H076-02 (Water) Sample Date: 08/04/26 9:13 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.44 0.10 2 mg/L 08/10/26 08/10/26 2632238 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/14/26 08/14/26 2633295 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/07/26 08/07/26 2632205 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.98 mg/L 08/04/26 08/04/26 2632040 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/04/26 08/05/26 2632044
Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
556
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 1- I&M Treatment Plant
Work Order:
08/04/26 15:35
G26H076
Reported:
Received:
08/18/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H076-02 (Water) Sample Date: 08/04/26 9:13 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Microbiology Analyses
Plate Count SM9215B ND 1 500 CFU/ml 08/04/26 08/06/26 2632044 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
557
558
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
25 August 2026
Sincerely,
Geo-Monitor No.: G26H174
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/11/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Week 3 - I&M Treatment Plant
559
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 3 - I&M Treatment Plant
Work Order:
08/11/26 15:18
G26H174
Reported:
Received:
08/25/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H174-01 (DW) Sample Date: 08/11/26 9:25 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 1.15 mg/L 08/11/26 08/11/26 2633053 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/11/26 08/13/26 2633042 Geo-Monitor Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H174-02 (DW) Sample Date: 08/11/26 9:51 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.48 0.10 2 mg/L 08/14/26 08/14/26 2633266 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/20/26 08/20/26 2634206 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/20/26 08/20/26 2634213 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.44 mg/L 08/11/26 08/11/26 2633053 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/11/26 08/12/26 2633042
Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
560
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 3 - I&M Treatment Plant
Work Order:
08/11/26 15:18
G26H174
Reported:
Received:
08/25/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H174-02 (DW) Sample Date: 08/11/26 9:51 Sampler: Eric J Cardamone Rep. Limit MCL Qualifier
Microbiology Analyses
Plate Count SM9215B ND 1 500 CFU/ml 08/11/26 08/13/26 2633042 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
561
562
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
01 September 2026
Sincerely,
Geo-Monitor No.: G26H284
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/18/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Monthly - I&M Treatment Plant
563
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - I&M Treatment Plant
Work Order:
08/18/26 15:23
G26H284
Reported:
Received:
09/01/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H284-01 (Water) Sample Date: 08/18/26 9:24 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.44 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 1.91 mg/L 08/18/26 08/18/26 2634035 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634043 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
564
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - I&M Treatment Plant
Work Order:
08/18/26 15:23
G26H284
Reported:
Received:
09/01/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H284-02 (Water) Sample Date: 08/18/26 10:15 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.41 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.54 mg/L 08/18/26 08/18/26 2634035 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634043
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634043 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
565
566
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
31 August 2026
Sincerely,
Geo-Monitor No.: G26H285
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/18/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Monthly - Wells
567
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 3G2 G26H285-01 (Water) Sample Date: 08/18/26 9:55 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.54 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 2.4 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 880 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 41 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.01 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B 2 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
568
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 4G G26H285-02 (Water) Sample Date: 08/18/26 9:34 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.47 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 40 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.02 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
569
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 8G2 G26H285-03 (Water) Sample Date: 08/18/26 9:48 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.33 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 630 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.31 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
570
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 14A G26H285-04 (Water) Sample Date: 08/18/26 9:41 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.50 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 56 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.01 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B 8 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
571
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Monthly - Wells
Work Order:
08/18/26 15:23
G26H285
Reported:
Received:
08/31/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Well 15 G26H285-05 (Water) Sample Date: 08/18/26 8:47 Sampler: Salvador Ruiz Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.40 0.10 2 mg/L 08/21/26 08/21/26 2634194 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 3.8 2.0 10 ug/L 08/28/26 08/28/26 2635265 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 08/28/26 08/28/26 2635261 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.01 mg/L 08/18/26 08/18/26 2634036 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/18/26 08/19/26 2634045
Geo-Monitor Inc.
Plate Count SM9215B 8 1 500 CFU/ml 08/18/26 08/20/26 2634045 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
572
573
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
02 September 2026
Sincerely,
Geo-Monitor No.: G26H397
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/25/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project: Week 4 - I&M Treatment Plant
574
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 4 - I&M Treatment Plant
Work Order:
08/25/26 15:40
G26H397
Reported:
Received:
09/02/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Filter Effluent G26H397-01 (DW) Sample Date: 08/25/26 9:23 Sampler: Edward Rodriguez Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Iron (Fe) EPA 200.7 ND 100 300 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 1.61 mg/L 08/25/26 08/25/26 2635037 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056
Geo-Monitor Inc.
Plate Count SM9215B ND 1 500 CFU/ml 08/25/26 08/27/26 2635042 Geo-Monitor Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H397-02 (DW) Sample Date: 08/25/26 10:03 Sampler: Edward Rodriguez Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
General Chemical Analyses
Fluoride (F) EPA 300.0 0.44 0.10 2 mg/L 08/27/26 08/27/26 2635195 Analysis performed at CLSB; ELAP 1088
Metals
Arsenic (As) EPA 200.8 ND 2.0 10 ug/L 09/01/26 09/01/26 2636080 Analysis performed at CLSB; ELAP 1088
Iron (Fe) EPA 200.7 ND 100 300 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Manganese (Mn) EPA 200.7 ND 10 50 ug/L 09/01/26 09/01/26 2635270 Analysis performed at CLSB; ELAP 1088
Field Analyses
Cl Res Free (Field) Field 0.5 mg/L 08/25/26 08/25/26 2635037 Geo-Monitor Inc.
Microbiology Analyses
Total Coliform SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056 Geo-Monitor Inc.
E. Coli SM 9223 A 1 1 P/A 08/25/26 08/25/26 2635056
Geo-Monitor Inc.
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
575
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water
Week 4 - I&M Treatment Plant
Work Order:
08/25/26 15:40
G26H397
Reported:
Received:
09/02/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
Front Pump House G26H397-02 (DW) Sample Date: 08/25/26 10:03 Sampler: Edward Rodriguez Rep. Limit MCL Qualifier
Microbiology Analyses
Plate Count SM9215B ND 1 500 CFU/ml 08/25/26 08/27/26 2635042 Geo-Monitor Inc.
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
576
577
Geo-Monitor, Inc.
Woodard & Curran - Adelanto Water
Adelanto, CA 92301
11780 Air Expressway
Chris Mcmahon
Kristal Escobar
Laboratory Supervisor
08 September 2026
Sincerely,
Geo-Monitor No.: G26H441
Enclosed are the results of the analyses for sample(s) received at the laboratory on 08/27/26 . These sample(s) were analyzed at a sub-contract laboratory, with the final reports indicating the analyzing/reporting laboratory.
If applicable, these final reports will also indicate any state EDT transfer that has occurred. Please call if any additional information and/or assistance are needed.
Thank you for choosing Geo-Monitor, Inc for your analytical needs.
Project Name: Adelanto Water
Sub Project:
578
Sub Project:
Project Manager:
Woodard & Curran - Adelanto Water
11780 Air Expressway
Adelanto CA, 92301 Chris Mcmahon
Project: Adelanto Water Work Order:
08/27/26 16:33
G26H441
Reported:
Received:
09/08/26
Geo-Monitor, Inc.
Analyte Method Result Units Prepared Analyzed Batch
11202 Chapparal Ave G26H441-03 (DW) Sample Date: 08/27/26 6:00 Sampler: Not Listed Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Copper (Cu) EPA 200.7 ND 50 1000 ug/L 09/03/26 09/03/26 2636166 Analysis performed at CLSB; ELAP 1088
Lead (Pb) EPA 200.8 ND 5.0 ug/L 09/03/26 09/03/26 2636176 Analysis performed at CLSB; ELAP 1088
Analyte Method Result Units Prepared Analyzed Batch
14590 Sage Ln G26H441-04 (DW) Sample Date: 08/27/26 7:00 Sampler: Not Listed Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Copper (Cu) EPA 200.7 170 50 1000 ug/L 09/03/26 09/03/26 2636166 Analysis performed at CLSB; ELAP 1088
Lead (Pb) EPA 200.8 ND 5.0 ug/L 09/03/26 09/03/26 2636176 Analysis performed at CLSB; ELAP 1088
Analyte Method Result Units Prepared Analyzed Batch
11331 Dartmouth G26H441-05 (DW) Sample Date: 08/27/26 7:30 Sampler: Not Listed Rep. Limit MCL Qualifier
Clinical Laboratory of San Bernardino
Metals
Copper (Cu) EPA 200.7 88 50 1000 ug/L 09/03/26 09/03/26 2636166 Analysis performed at CLSB; ELAP 1088
Lead (Pb) EPA 200.8 ND 5.0 ug/L 09/03/26 09/03/26 2636176 Analysis performed at CLSB; ELAP 1088
ND Analyte NOT DETECTED at or above the reporting limit Kristal Escobar
Laboratory Supervisor
P.O. Box 401428 Hesperia, CA 92340. 760-244-3481. ELAP Number 2691
579
580
ADELANTO PUBLIC UTILITY AUTHORITY
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: October 14, 2026
TO: Honorable Chairman, and Public Utility Authority Members FROM: Jessie Flores, Executive Director
BY: Chris McMahon, Woodard & Curran, Area Manager/ Senior Principal SUBJECT: RECEIVE AND FILE THE WASTERWATER DEPARTMENT MONTHYLY REPORT – JULY 2026
STAFF RECOMMENDATION:
Receive and File the Wastewater Department Monthly Report.
ATTACHMENTS:
1. Wastewater Department Monthly Report – JULY 2026
581
City of Adelanto 1 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
Table of Contents
Wastewater Department
Monthly Operating Report
July 2026
582
City of Adelanto 2 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
Section Page No.
1. Executive Summary ……………………………………………………… 3
2. Health & Safety ……………………………………………………… 4
3. Regulatory Compliance ……………………………………………………… 5
4. WWTP Operations ……………………………………………………… 6
4.1. Flow & Loading ……………………………………………………… 6
4.2. Bio-Solids Report ……………………………………………………… 7
5. Collection System management ……………………………………………………… 8
6. Industrial Pretreatment Program ……………………………………………………… 9
7. Maintenance & Repair ……………………………………………………… 10
8. Personnel ……………………………………………………… 12
9. Financial Overview ……………………………………………………… 13
Attachments:
1. Maintenance History Report
2. Adelanto WWTP Summary Report
3. Monthly Laboratory Analysis
583
City of Adelanto 3 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
1. Executive Summary
During July 2026, the City of Adelanto Wastewater Treatment Plant (WWTP) and collection system maintained 100% regulatory compliance, achieved zero sanitary sewer overflows (SSOs), and continued to deliver reliable wastewater treatment and collection services. Operations remained focused on treatment performance, system reliability, water conservation, safety, and proactive asset management.
Compliance Wastewater Treated Collection System Safety & Maintenance 100% compliant
0 permit violations
103.904 MG total
3.352 MGD average
0 SSOs
18,367 LF cleaned
8,912 LF inspected
56.9% audit completion
122 PMs completed
Operational Highlights
Regulatory compliance was maintained throughout the month, with all required sampling completed and effluent quality remaining well below permit limits. Average effluent concentrations were 7.5 mg/L BOD, 0.08 mg/L MBAS, and 3.9 mg/L Total Nitrogen. The WWTP treated 103.904 million gallons of wastewater during July, averaging 3.352 MGD. July marked the first full month of operation utilizing reclaimed water for plant process needs, significantly reducing potable water consumption and supporting long-term water conservation efforts.
The collection system recorded zero SSOs during the month and remains at zero year-to-date.
Crews completed extensive sewer cleaning and CCTV inspection activities to support proactive maintenance.
Safety, Reliability, and Asset Management
Staff maintained compliance with the SPARKS safety program and increased Startup Safety Audit completion to 56.9%, with 95 of 167 corrective actions completed. A 5.5-hour utility power outage was successfully managed through emergency backup generation, allowing uninterrupted treatment operations. Staff responded to and resolved aeration blower control issues, repaired a headworks water leak, completed annual generator servicing, and continued implementation of the Utility Cloud asset management platform.
Financial Summary
Major operating cost drivers during July continued to be biosolids hauling and disposal and treatment chemicals. Reclaimed water utilization is expected to continue generating operational savings by reducing potable water demand.
Bottom Line
July was a successful month for the Adelanto Wastewater Department, highlighted by full regulatory compliance, zero SSOs, reliable plant performance, successful emergency power response, continued safety improvement, and ongoing investment in proactive maintenance and asset management. 584
City of Adelanto 4 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
2. Health & Safety
Monthly Safety Training
As part of the of operations for the City of Adelanto’s wastewater facilities staff receive routine safety training to ensure that they are working safely. This is accomplished through daily safety tailgate meetings, assigned monthly training topics, and topic specific safety stand downs periodically.
Staff has received the following trainings this year as part of the company wide training program:
February 2026: Ergonomics
March 2026: Stand Down: Slips, Trips, and Falls
March 2026: Stand Down: Finger Injuries
March 2026: Vehicle Safety Training
April 2026: Machine Guarding
May 2026: Fall Protection Awareness
June 2026: Respiratory Protection
July 2026: Heat Stress Awareness
SPARKS Program Overview
The Woodard & Curran SPARKS Program is a company-wide health and safety initiative that recognizes employees and teams who demonstrate a strong commitment to maintaining a safe and healthy workplace. The program promotes proactive safety leadership through completion of required safety training, participation in monthly safety meetings, fulfillment of annual health and safety requirements, and adherence to safe work practices that prevent OSHA-recordable incidents. By reinforcing daily hazard awareness, accountability, teamwork, and open communication regarding safety concerns, the SPARKS Program helps foster a culture of continuous improvement and operational excellence across all facilities.
The Adelanto team remains fully compliant with all SPARKS Program requirements, reflecting its ongoing commitment to employee safety, regulatory compliance, and reliable utility operations Startup Safety Audit
167 actions items were identified in the Startup Safety Audit and staff has already started to address the items. Many components to resolve the action items are on order and will arrive in the coming months to correct the identified issues.
To date 95 of the 167 identified action items have been resolved.
56.9% of the 167 action items have been completed to date. 585
City of Adelanto 5 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
3. Regulatory Compliance
During this reporting period, the City of Adelanto has maintained 100% regulatory compliance with all regulatory requirements. All required samples were collected and analyzed for required water quality constituents. Babcock Laboratories continues to be the preferred vendor for outside wastewater laboratory analysis. All process control analysis is performed in-house by Woodard & Curran staff, this analysis is crucial for making the adjustments at the facilities to ensure that treatment goals are achieved.
Table 3-1 – Monthly Mean
Constituents Units 30 day Mean Limit Measured Mean
Biochemical Oxygen Demand (BOD) mg/L 15 7.5
Methylene Blue Active Substances (MBAs) mg/L 1 0.08
Total Nitrogen (TN) mg/L 10 3.9
Table 3-2 – Daily Maximum
Constituents Units Daily Limit Measured
Biochemical Oxygen Demand (BOD) mg/L Maximum 30 7.5
Methylene Blue Active Substances (MBAS) mg/L Maximum 2 0.12 Total Nitrogen (TN) mg/L NA 6.0
pH Su Between 6.0 to 9.0 7.08 – 7.31
Dissolved Oxygen (DO) mg/L Minimum 1 mg/L 2.26
586
City of Adelanto 6 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
4. WWTP Operations
Influent flow for the month of July totaled 103.904 MG with a peak flow of 3397 GPM on July 4th.
All pH and electrical conductivity monitoring equipment was calibrated weekly, monthly, or as needed by plant staff based on the manufacturer’s recommendations and operational needs.
Operational highlights for the reporting period:
7/28/26: Utility power to the WWTP was out of service for 5.5 hours. Backup power was provided for the facility by the emergency generator without issue. Staff ensured that all equipment switched between the power sources without issue maintaining normal operations. July was the first full month of operations at the WWTP using reclaimed water for the majority of process water. A graph below shows the daily potable water use for the months of May, June, and July. A clear and dramatic drop in water use can be seen when the reclaimed water system was put into service.
4.1 Flow & Loading
Table 4-1 – Monthly Influent Information
Parameter Units Measured Value
Total Flow MG 103.904
Average Daily Flow MGD 3.352
Maximum Daily Flow MG 3.577
Minimum Daily Flow MG 3.254
Maximum Daily Peak Flow GPM 3397
Minimum Daily Peak Flow GPM 2896
Average BOD mg/L 204
Average Total Suspended Solids (TSS) mg/L 168
Average pH su 6.99
Average Electrical Conductivity (EC) umho/cm 1225
0 50000
100000
150000
200000
250000
300000
350000
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031 Potable Water Use at WWTP
May June July
587
City of Adelanto 7 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
Table 4-2 – Monthly Effluent Information
Parameter Units Measured Value
Average BOD mg/L 7.5
Average TSS mg/L 1.5
Average Total Nitrogen mg/L 3.9
Average Total Dissolved Solids (TDS) mg/L 550
Average MBAs mg/L 0.08
Average DO mg/L 2.14
Average pH Su 7.17
Average Electrical Conductivity (EC) umho/cm 857
4.2 Bio-Solids Report
Table 4-3: Biosolids Hauled
Table 4-4: Residual Disposal
2026 Screenings/Grit Recycle
# of Bins Cubic Yards # of Bins
January 2026 21 42 1
February 2026 21 42 2
March 2026 27 54 4
April 2026 24 48 3
May 2026 27 54 5
June 2026 18 36 4
July 2026 18 36 5
TOTAL 156 312 24
588
City of Adelanto 8 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
5. Collection System Management
Zero sanitary sewer overflows occurred during the reporting period.
Zero sanitary sewer overflows have occurred during 2026.
Table 5-1: Collection System Maintenance
Collection System Cleaning Linear Feet Cleaned Linear Feet Inspected February 2026 0 0
March 2026 7,775 0
April 2026 1,320 0
May 2026 7,702 480
June 2026 16,123 11,169
July 2026 18,367 8,912
TOTAL 51,287 20,561
The City of Adelanto utilizes SmartCover® monitoring
technology as part of its proactive wastewater collection system management program. Smart Covers are installed on key sewer manholes and critical collection system locations to provide real-time monitoring of wastewater levels and system conditions. These devices continuously transmit data and generate alerts when sewer levels rise above predetermined thresholds, allowing operators to identify potential blockages, inflow and infiltration issues, or developing overflow conditions before they become sanitary sewer overflows (SSOs).
The system enhances operational awareness, supports regulatory compliance, improves emergency response times, and allows collection system staff to prioritize maintenance activities more efficiently.
There were no high-level alarms during the month of July. 589
City of Adelanto 9 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
From this information measured by the SmartCovers located in the system available capacity for locations can be seen. The Auburn & Verbena pipe is full constantly with limited additional capacity for additional water.
6. Industrial Pretreatment Program
Woodard & Curran is in the process of reviewing the APUA Industrial Pretreatment Program and develop a plan for ensuring compliance with all regulatory requirements is maintained.
MK Magnetics is currently in the process of renewing their discharge permit with the APUA. 590
City of Adelanto 10 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
7. Maintenance & Repair
Woodard & Curran is in the process of implementing the Utility Cloud platform for maintenance management of all assets in the sewer collection system and wastewater treatment plant.
Adelanto Wastewater Treatment Plant staff continued to conduct routine weekly equipment inspections and perform maintenance while the Utility Cloud platform is implemented. 7/1/2026: Aeration Blower #2 failed at the WWTP. This created a situation where two aeration blowers were out of service. Immediate action was taken to resolve this issue and ensure that treatment at the facility was uninterrupted.
o Aeration Blower motors were confirmed to be operating properly. o Power Inverter function was found to be the issue. Staff was able to determine the issues with the two inoperable blowers and return them to service. o Staff’s urgency in diagnosing the issues preventing operation maintained compliance at the facility and avoided a costly service visit from specialty contractors. 7/8/26: Repaired 3” Water Leak at Headworks of the
WWTP.
7/22/26: Annual service was performed on the WWTP and Muskrat Lift Station Emergency Generators.
Throughout the month staff worked with Animal Control to deal with stray dogs that have been roaming the
grounds of the WWTP.
591
City of Adelanto 11 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
Table 7-1: Annual Maintenance History
Collection System Cleaning Preventative Corrective Inspection February 2026 Program Implementation
March 2026 124 15 2
April 2026 104 2 1
May 2026 92 34 13
June 2026 97 10 46
July 2026 122 32 4
TOTAL 539 93 66
592
City of Adelanto 12 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
8. Personnel
The City of Adelanto is supported by a dedicated team of six (6) full-time on-site personnel. In addition, both the City and the on-site team are backed by a broad network of technical and administrative experts from Woodard & Curran.
Onsite Staff
Adam Ambrose – Project Manager
Dutch Hause - Lead WWTP Operator
James Strang – Operator 2
Scott Heller – Operator 1
Art Vega– Lead Collections Systems Operator
Armando Zamora – Collection Systems Operator 1
Edwin Cruz – Collection Systems Operator 1
Additional Support Staff
Chris McMahon – Area Manager
Dave Kitzmiller – Operations Leader-Western U.S.
Marc Thomas – National Operations Leader
Anthony Naccarato – Client Services Manager
Adam Shapiro – O&M Technology Implementation Specialist Steve Lindemann – O&M Health & Safety Manager
Kyle McKee – Health & Safety Specialist
Ken Davis – Asset Management Services Manager
593
City of Adelanto 13 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-07 July 2026
9. Financial Overview
Budget tracking for Fiscal Year 2026-2027:
Table 9-1 – Chemical Costs
Chemical Monthly Order Monthly Cost Fiscal YTD Cost
Polymer 2 totes (550 gallons) $8872.12 $8872.12
Table 9-2 – Monthly Power Consumption
KWH Consumption SCE Solar
February 2026 850 238
March 2026 816 309
April 2026 720 342
May 2026 719 360
June 2026 679 403
July 2026 737 307
Table 9-3 – Bio-solids Costs
Hauling / Tipping Fee Monthly Cost Fiscal YTD Cost
GIC (Hauling) $4,444.95 $4,444.95
Synagro (Tipping Fee) $9,360.86 $9,360.86
TOTAL COMBINED $13,805.81 $13,805.81
594
Maintenance History Report
Work Orders by Type Total
Preventative Maintenance 122
Inspections 32
Corrective Maintenance 4
Total 158
Report Start: 7/1/2026
Report End: 7/31/2026
Adelanto, CA Wastewater
Top Work Orders by Description
595
Date Asset Name Work Order Description Staff Work Type Status Corrective Maintenance
Corrective Work Order
7/9/2026 WW Blower #1 Motor Test / replace blower motor Dutch Hause Corrective Maintenance
Complete
7/21/2026 WW Blower #2 Inverter Inspect / replace invertor Dutch Hause Corrective Maintenance
Complete
7/6/2026 WW Grounds Fix 3 inch waterline Dutch Hause Corrective Maintenance
Complete
7/24/2026 WW Centrisys Centrifuge repair water cooler line on hydraulic oil cooler for the backdrive
Dutch Hause Corrective
Maintenance
Complete
Corrective Maintenance Total: 4
Inspections
CCTV
7/1/2026 Gravity Main ADEL-SGM-2219 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/13/2026 Gravity Main ADEL-SGM-2204 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/13/2026 Gravity Main ADEL-SGM-2185 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2384 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2387 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2386 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2189 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2378 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2385 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2187 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2184 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/14/2026 Gravity Main ADEL-SGM-2183 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/15/2026 Gravity Main ADEL-SGM-2388 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/15/2026 Gravity Main ADEL-SGM-2390 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/15/2026 Gravity Main ADEL-SGM-2389 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/15/2026 Gravity Main ADEL-SGM-2383 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/15/2026 Gravity Main ADEL-SGM-2381 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 596
Date Asset Name Work Order Description Staff Work Type Status 7/16/2026 Gravity Main ADEL-SGM-2190 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/16/2026 Gravity Main ADEL-SGM-2191 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/16/2026 Gravity Main ADEL-SGM-2391 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/16/2026 Gravity Main ADEL-SGM-2379 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/16/2026 Gravity Main ADEL-SGM-2188 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/16/2026 Gravity Main ADEL-SGM-2186 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/20/2026 Gravity Main ADEL-SGM-2460 3 Year Gravity Main CCTV Art Vega Inspections Complete 7/20/2026 Gravity Main ADEL-SGM-2463 3 Year Gravity Main CCTV Art Vega Inspections Complete 7/22/2026 Gravity Main ADEL-SGM-2433 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/27/2026 Gravity Main ADEL-SGM-2395 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/27/2026 Gravity Main ADEL-SGM-2394 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/27/2026 Gravity Main ADEL-SGM-2397 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/27/2026 Gravity Main ADEL-SGM-2396 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/27/2026 Gravity Main ADEL-SGM-2197 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 7/27/2026 Gravity Main ADEL-SGM-2196 3 Year Gravity Main CCTV Armando Zamora Inspections Complete Inspections Total: 32
Preventative Maintenance
Barscreen PM - Monthly
7/28/2026 WW West Screen (1) Monthly Barscreen PM Scott Heller Preventative Maintenance
Complete
7/28/2026 WW East Screen (2) Monthly Barscreen PM Scott Heller Preventative Maintenance
Complete
Biolac System PM - Monthly
7/28/2026 WW North AB Aeration Header
Manifold Piping
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4111
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4110
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4109
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
597
Date Asset Name Work Order Description Staff Work Type Status 7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4108
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4107
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4105
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4104
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4103
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4102
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4101
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Aeration Header
Manifold
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4108
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4107
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4106
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4105
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4104
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4103
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4102
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4101
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4111
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
598
Date Asset Name Work Order Description Staff Work Type Status 7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4110
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW South AB Discharge Piping &
Diffusers MV-4109
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
7/28/2026 WW North AB Discharge Piping &
Diffusers MV-4106
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
Blower Compressor Inspection - Monthly
7/10/2026 WW Blower #1 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Closed
7/10/2026 WW Blower #2 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Complete
7/10/2026 WW Blower #3 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Complete
7/10/2026 WW Blower #4 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Complete
Compactor Inspection - Weekly
7/10/2026 WW West Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
7/10/2026 WW East Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
7/28/2026 WW East Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
7/28/2026 WW West Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
Generator PM - Annual
7/28/2026 WW Generator Annual Generator PM Dutch Hause Preventative Maintenance
Complete
7/22/2026 LS1 Emergency Generator Annual Generator PM Dutch Hause Preventative Maintenance
Complete
Line Cleaning
7/8/2026 Gravity Main ADEL-SGM-2384 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
599
Date Asset Name Work Order Description Staff Work Type Status 7/8/2026 Gravity Main ADEL-SGM-2388 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2390 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2389 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2391 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2379 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2387 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2385 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2378 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2189 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2187 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2188 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2186 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2204 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2185 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/9/2026 Gravity Main ADEL-SGM-2381 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
7/9/2026 Gravity Main ADEL-SGM-2383 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
7/9/2026 Gravity Main ADEL-SGM-2191 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
600
Date Asset Name Work Order Description Staff Work Type Status 7/9/2026 Gravity Main ADEL-SGM-2190 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
7/9/2026 Gravity Main ADEL-SGM-2184 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
7/9/2026 Gravity Main ADEL-SGM-2183 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
7/8/2026 Gravity Main ADEL-SGM-2386 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/20/2026 Gravity Main ADEL-SGM-2210 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
7/20/2026 Gravity Main ADEL-SGM-2164 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/20/2026 Gravity Main ADEL-SGM-2163 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/20/2026 Gravity Main ADEL-SGM-2162 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2181 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2182 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2180 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2179 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2178 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2177 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2173 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2176 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2172 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
601
Date Asset Name Work Order Description Staff Work Type Status 7/21/2026 Gravity Main ADEL-SGM-2175 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2171 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2174 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2170 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2392 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2393 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2194 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2195 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2165 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2166 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2433 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2395 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2394 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2397 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2396 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2197 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/21/2026 Gravity Main ADEL-SGM-2196 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
602
Date Asset Name Work Order Description Staff Work Type Status 7/23/2026 Gravity Main ADEL-SGM-2370 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2399 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2400 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2371 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2373 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/24/2026 Gravity Main ADEL-SGM-2376 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2375 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2374 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2087 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2082 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2078 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/23/2026 Gravity Main ADEL-SGM-2198 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
7/20/2026 Gravity Main ADEL-SGM-2469 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
Monthly Emergency Light Test
7/10/2026 WW MCC Room Exit Sign Monthly Emergency Light Test Scott Heller Preventative Maintenance
Complete
7/28/2026 WW Office Exit Sign 1 Monthly Emergency Light Test Scott Heller Preventative Maintenance
Complete
7/28/2026 WW Office Exit Sign 2 Monthly Emergency Light Test Scott Heller Preventative Maintenance
Complete
603
Date Asset Name Work Order Description Staff Work Type Status 7/28/2026 WW Office Exit Sign 3 Monthly Emergency Light Test Scott Heller Preventative Maintenance
Complete
Monthly Fire Extinguisher Inspection
7/28/2026 WW Office Fire Extinguisher 1 Monthly Fire Extinguisher Inspection Scott Heller Preventative Maintenance
Complete
7/28/2026 WW Office Fire Extinguisher 2 Monthly Fire Extinguisher Inspection Scott Heller Preventative Maintenance
Complete
7/28/2026 WW Generator Fire Extinguisher Monthly Fire Extinguisher Inspection Scott Heller Preventative Maintenance
Complete
Polymer Skid Inspection - Monthly
7/10/2026 WW Polymer Skid 1 Monthly Polymer Skid Inspection Scott Heller Preventative Maintenance
Complete
7/10/2026 WW Polymer Skid 2 Monthly Polymer Skid Inspection Scott Heller Preventative Maintenance
Complete
Pump/Motor PM - Quarterly
7/28/2026 WW Andritz Auger Motor Quarterly Pump/Motor PM Scott Heller Preventative Maintenance
Complete
7/28/2026 WW RAS/WAS Flygt Pump 1 Quarterly Pump/Motor PM Scott Heller Preventative Maintenance
Complete
7/28/2026 WW RAS/WAS Flygt Pump 2 Quarterly Pump/Motor PM Scott Heller Preventative Maintenance
Complete
7/28/2026 WW RAS/WAS Flygt Pump 3 Quarterly Pump/Motor PM Scott Heller Preventative Maintenance
Complete
Weekly Safety Shower & Eyewash Station Inspection
7/10/2026 WW Safety Shower at Abandoned
Chlorine Tanks
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
7/10/2026 WW Centrifuge Eyewash Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
7/10/2026 WW Chemical Building Emergency
Eye Wash Station
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
7/10/2026 WW Lab Safety Shower Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
604
Date Asset Name Work Order Description Staff Work Type Status 7/28/2026 WW Safety Shower at Abandoned
Chlorine Tanks
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
7/28/2026 WW Centrifuge Eyewash Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
7/28/2026 WW Chemical Building Emergency
Eye Wash Station
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
7/28/2026 WW Lab Safety Shower Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
Preventative Maintenance Total: 122
Report Total: 158
605
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT July 2026
Date: 9/10/2026
California Regional Water Quality Control Board
Lahontan Region
2501 Lake Tahoe Boulevard
South Lake Tahoe, CA 96150
Facility Name: Adelanto Domestic Wastewater Treatment Facility Address: 19101 Jonathan St.
Adelanto, CA 92301
Contact Person: Chris McMahon
Job Title: Area Manager
Phone: 620-474-7310
Email: [email protected]
WDR/NPDES Order Number: WDR100026851
WDID Number: 6B369805001
Type of Report: Monthly Quarterly Semi-Annual Annual Other Month(s): JAN FEB MAR APR MAY JUN
JUL AUG SEP OCT NOV DEC
*annual reports (circle first month of the reporting period) Year: 2026
Violations?: X NO YES*
*If YES is marked compelte a-g (Attach Additional information as necessary) I cerfity under penalty of law that this document and all attachments were prepared under my direction or supervison following a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my knowledge of the person(s) who manage the system, or those directly responsible for data gathering, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifcant penalties for submitting false information, including the possiblity of fine and imprisonment.
If you have any questions or require additional information, please contact Chris McMahon at the number provided above.
Signature:
Name: Chris McMahon
Title: Area Manager
606
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT July 2026
Operational Problems and Maintenance Activities Affecting Effluent Discharges or Compliance:
No issues to report.
Corrective Actions (as needed):
Not applicable
Corrective Actions Schedule (as needed):
Not applicable
607
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT July 2026
Inf Flow Inst. Peak Flow Eff. Q Ponds Pond #1Pond #2 & #3Pond #4 Pond #5 Pond #9 Basin N Basin S MGD GPM MGD Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft 7/1/2026 3.3634 3311.73 3.3634 21.00 EMPTY 16.00 13.75 16.00 2.32 2.24 7/2/2026 3.3024 3127.41 3.3024 21.50 EMPTY 16.00 13.75 16.00 2.25 2.18 7/3/2026 3.2958 3046.13 3.2958 22.00 EMPTY 16.00 13.50 16.00 2.62 2.44 7/4/2026 3.4327 3397.11 3.4327 22.50 EMPTY 16.00 13.50 16.00 2.15 2.08 7/5/2026 3.3788 3113.44 3.3788 22.75 EMPTY 16.00 13.50 16.00 2.26 2.15 7/6/2026 3.3584 3288.81 3.3584 23.00 EMPTY 16.00 13.25 16.00 2.25 2.36 7/7/2026 3.3754 3234.77 3.3754 23.25 EMPTY 16.00 13.00 16.00 2.51 2.37 7/8/2026 3.3927 3214.52 3.3927 23.50 EMPTY 16.00 12.75 16.00 2.44 2.33 7/9/2026 3.3209 3195.14 3.3209 23.50 EMPTY 16.00 12.50 16.00 2.55 2.44 7/10/2026 3.3820 3124.58 3.3820 23.50 EMPTY 16.00 12.50 16.00 2.41 2.57 7/11/2026 3.2819 2984.94 3.2819 23.50 EMPTY 16.00 12.50 16.00 2.69 2.51 7/12/2026 3.3701 3179.84 3.3701 23.50 EMPTY 16.00 12.50 16.00 2.69 2.51 7/13/2026 3.5765 3396.85 3.5765 24.00 EMPTY 16.00 12.50 16.00 2.44 2.33 7/14/2026 3.4340 3331.16 3.4340 24.00 EMPTY 16.00 12.25 16.00 2.40 2.33 7/15/2026 3.3355 3233.23 3.3355 24.00 EMPTY 16.00 12.25 16.00 2.25 2.39 7/16/2026 3.3155 3188.04 3.3155 24.00 EMPTY 16.00 12.25 16.00 2.50 2.37 7/17/2026 3.4003 3094.04 3.4003 24.00 EMPTY 16.00 12.25 16.00 2.47 2.40 7/18/2026 3.2542 2977.54 3.2542 24.00 EMPTY 16.00 12.25 16.00 2.44 2.29 7/19/2026 3.2561 3128.95 3.2561 24.00 EMPTY 16.00 12.50 16.00 2.47 2.33 7/20/2026 3.3664 3277.66 3.3664 24.00 EMPTY 16.00 12.50 16.00 2.55 2.38 7/21/2026 3.3492 3320.22 3.3492 24.00 EMPTY 16.00 12.50 16.00 2.53 2.33 7/22/2026 3.3630 3232.06 3.3630 24.00 EMPTY 16.00 12.50 16.00 2.62 2.47 7/23/2026 3.3217 3213.74 3.3217 24.00 EMPTY 16.00 12.75 16.00 2.87 2.62 7/24/2026 3.3515 3131.74 3.3515 24.00 EMPTY 16.00 12.75 16.00 2.73 2.62 7/25/2026 3.3106 2896.11 3.3106 24.00 EMPTY 16.00 12.50 16.00 2.80 2.58 7/26/2026 3.3181 3095.41 3.3181 24.00 EMPTY 16.00 12.50 16.00 2.91 2.76 7/27/2026 3.3473 3285.01 3.3473 24.00 EMPTY 16.00 12.50 16.00 2.69 2.58 7/28/2026 3.3715 3218.69 3.3715 24.00 EMPTY 16.00 12.50 16.00 2.69 2.65 7/29/2026 3.3165 3230.6 3.3165 24.00 EMPTY 16.00 12.50 16.00 2.63 2.49 7/30/2026 3.3065 3258.78 3.3065 24.00 EMPTY 16.00 12.50 16.00 2.99 2.78 7/31/2026 3.3549 3007.6 3.3549 24.00 EMPTY 16.00 12.50 16.00 2.81 2.66 Total 103.904 103.904
Average 3.352 3185.026 3.352 23.532 EMPTY 16.000 12.702 16.000 2.546 2.437 Maximum 3.577 3397.107 3.577 24.000 0.000 16.000 13.750 16.000 2.990 2.780 Minimum 3.254 2896.108 3.254 21.000 0.000 16.000 12.250 16.000 2.150 2.080 Date
Flow Data Percolation Ponds Biolac Basins
608
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT July 2026
BOD5 TSS pH D.O. EC TN TDS MBAS BOD5 TSS pH EC
mg/L mg/L su mg/L umho/cm mg/L mg/L mg/L mg/L mg/L su umho/cm 7/1/2026 < 5 2 7.31 2.01 855 2 560 0.12 240 190 7.89 1377 7/2/2026
7/3/2026
7/4/2026
7/5/2026
7/6/2026
7/7/2026
7/8/2026 7.5 1 7.17 2.09 858 6 230 210 5.97 1336
7/9/2026
7/10/2026
7/11/2026
7/12/2026
7/13/2026
7/14/2026
7/15/2026 < 5 3 7.17 2.22 833 4.9 540 0.04 190 160 6.53 1318 7/16/2026
7/17/2026
7/18/2026
7/19/2026
7/20/2026
7/21/2026
7/22/2026 < 2.5 0.8 7.08 2.26 891 3.9 240 180 7.11 939
7/23/2026
7/24/2026
7/25/2026
7/26/2026
7/27/2026
7/28/2026
7/29/2026 < 5 0.7 7.14 2.14 848 2.6 120 100 7.47 1154
7/30/2026
Total
Average 7.50 1.50 7.17 2.144 857 3.9 550 0.08 204.0 168.0 6.99 1225 Maximum 7.50 3.00 7.31 2.260 891 6.0 560 0.12 240.0 210.0 7.89 1377 Minimum 7.50 0.70 7.08 2.010 833 2.0 540 0.04 120.0 100.0 5.97 939 Date
Effluent Weekly Influent
609
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT July 2026
TN D.O. EC Temp TN D.O. EC Temp TN D.O. EC Temp
mg/L mg/L umho/cm C mg/L mg/L umho/cm C mg/L mg/L umho/cm C 7/1/2026
7/2/2026
7/3/2026
7/4/2026
7/5/2026
7/6/2026
7/7/2026
7/8/2026
7/9/2026
7/10/2026
7/11/2026
7/12/2026
7/13/2026
7/14/2026
7/15/2026
7/16/2026
7/17/2026
7/18/2026
7/19/2026
7/20/2026
7/21/2026
7/22/2026
7/23/2026
7/24/2026
7/25/2026
7/26/2026
7/27/2026
7/28/2026
7/29/2026
7/30/2026
Total
Average 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Maximum 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Minimum 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Date
Pond Monitoring #1 Annually Pond Monitoring #5 Annually Pond Monitoring #9 Annually 610
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6G0077-01 Liquid 07/1/26 6:50 Scot Heller Courier
(Guillermo)-DE
Influent Composite 07/01/26 12:09
C6G0077-02 Liquid 07/1/26 6:40 Scot Heller Courier
(Guillermo)-DE
Effluent Composite 07/01/26 12:09
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
611
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Laboratory Reference Number
Sample Description
07/01/26 06:50
Sampled Date/Time Received Date/Time
07/01/26 12:09
Matrix
Influent Liquid
C6G0077-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Dissolved Solids 690 20 20 mg/L SM 2540C 07/06/26 17:53 CLP Total Suspended Solids 190 10 10 mg/L SM 2540D 07/07/26 22:46 CLP Aggregate Organic Compounds
Biochemical Oxygen Demand 240 50 50 mg/L SM 5210B 07/01/26 22:50 CXR N-BOD1 Nutrients
Ammonia-Nitrogen 35 5.0 3.2 mg/L SM 4500NH3 G 07/06/26 09:17 RUB Kjeldahl Nitrogen 47 5.0 3.5 mg/L EPA 351.2 07/06/26 20:52 VMV mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
612
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Laboratory Reference Number
Sample Description
07/01/26 06:40
Sampled Date/Time Received Date/Time
07/01/26 12:09
Matrix
Effluent Liquid
C6G0077-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.55 0.20 0.12 mg/L EPA 300.0 07/02/26 00:23 GMB Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 07/02/26 00:23 GMB Solids
Total Dissolved Solids 560 10 10 mg/L SM 2540C 07/06/26 17:53 CLP Total Suspended Solids 2 0.5 0.5 mg/L SM 2540D 07/07/26 22:46 CLP Aggregate Organic Compounds
Biochemical Oxygen Demand ND 5.0 5.0 mg/L SM 5210B 07/01/26 22:50 CXR N-BOD1 Surfactants
MBAS 0.12 0.08 0.02 mg/L SM 5540C 07/01/26 20:50 BXR
Nutrients
Ammonia-Nitrogen 0.4 0.1 0.06 mg/L SM 4500NH3 G 07/06/26 09:18 RUB Kjeldahl Nitrogen 1.4 0.1 0.07 mg/L EPA 351.2 07/06/26 20:54 VMV Total Nitrogen 2.0 0.40 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
613
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6G01099 - Analyzed as Received IC
Blank (6G01099-BLK1) Prepared & Analyzed: 07/01/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6G01099-BS1) Prepared & Analyzed: 07/01/26
Nitrite as N 2.32 0.1 0.05 mg/L 2.50 93 90-110
Nitrate as N 5.42 0.20 0.12 mg/L 5.65 96 90-110
Matrix Spike (6G01099-MS1) Source: C6F3192-01RE1 Prepared & Analyzed: 07/01/26 Nitrite as N 1.80 0.1 0.05 mg/L 2.50 ND 72 80-120 QMint Nitrate as N 5.29 0.20 0.12 mg/L 5.65 ND 94 75-131
Matrix Spike (6G01099-MS2) Source: C6G0076-01 Prepared & Analyzed: 07/01/26 Nitrite as N 1.10 0.1 0.05 mg/L 2.50 ND 44 80-120 QFini, QMint Nitrate as N 10.6 0.20 0.12 mg/L 5.65 4.98 99 75-131
Matrix Spike Dup (6G01099-MSD1) Source: C6F3192-01RE1 Prepared & Analyzed: 07/01/26 Nitrite as N 1.96 0.1 0.05 mg/L 2.50 ND 78 80-120 9 20 QMint Nitrate as N 5.46 0.20 0.12 mg/L 5.65 ND 97 75-131 3 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
614
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6G06199 - Analyzed as received
Blank (6G06199-BLK1) Prepared & Analyzed: 07/06/26
Total Dissolved Solids ND 10 10 mg/L
LCS (6G06199-BS1) Prepared & Analyzed: 07/06/26
Total Dissolved Solids 746 10 10 mg/L 746 100 90-110
Duplicate (6G06199-DUP1) Source: C6G0117-04 Prepared & Analyzed: 07/06/26 Total Dissolved Solids 452 10 10 mg/L 455 0.7 20
Duplicate (6G06199-DUP2) Source: C6G0124-01 Prepared & Analyzed: 07/06/26 Total Dissolved Solids 698 10 10 mg/L 695 0.4 20
Batch 6G07243 - Analyzed as received
Blank (6G07243-BLK1) Prepared & Analyzed: 07/07/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6G07243-BS1) Prepared & Analyzed: 07/07/26
Total Suspended Solids 481 5 5 mg/L 500 96 90-110
Duplicate (6G07243-DUP1) Source: C6G0353-01 Prepared & Analyzed: 07/07/26 Total Suspended Solids 33.2 2 2 mg/L 30.8 8 25
Duplicate (6G07243-DUP2) Source: C6G0432-01 Prepared & Analyzed: 07/07/26 Total Suspended Solids 31.0 2 21.5 25 QFpas,
QRPDo
2 mg/L 36
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
615
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6G01113 - Analyzed as received
Blank (6G01113-BLK1) Prepared & Analyzed: 07/01/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6G01113-BS1) Prepared & Analyzed: 07/01/26
Biochemical Oxygen
Demand
184 50 50 mg/L 198 93 85-115
Duplicate (6G01113-DUP1) Source: C6G0003-01 Prepared & Analyzed: 07/01/26 Biochemical Oxygen
Demand
338 50 50 mg/L 308 9 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
616
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Surfactants - Batch Quality Control
Batch 6F30217 - Solvent Extraction.
Blank (6F30217-BLK1) Prepared & Analyzed: 06/30/26
MBAS ND 0.08 0.02 mg/L
LCS (6F30217-BS1) Prepared & Analyzed: 06/30/26
MBAS 0.428 0.08 0.02 mg/L 0.400 107 90-110
Matrix Spike (6F30217-MS1) Source: C6F3081-01 Prepared & Analyzed: 06/30/26 MBAS 0.509 0.20 0.06 mg/L 0.500 ND 102 43-150
Matrix Spike Dup (6F30217-MSD1) Source: C6F3081-01 Prepared & Analyzed: 06/30/26 MBAS 0.551 0.20 0.06 mg/L 0.500 ND 110 43-150 8 30
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
617
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6G02054 - Acid Digest
Blank (6G02054-BLK1) Prepared: 07/02/26 Analyzed: 07/06/26 Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6G02054-BS1) Prepared: 07/02/26 Analyzed: 07/06/26 Kjeldahl Nitrogen 1.03 0.1 0.07 mg/L 1.00 103 80-120
Duplicate (6G02054-DUP1) Source: C6F2067-04 Prepared: 07/02/26 Analyzed: 07/06/26 Kjeldahl Nitrogen 0.528 0.1 0.07 mg/L 0.612 15 25
Matrix Spike (6G02054-MS1) Source: C6F2067-04 Prepared: 07/02/26 Analyzed: 07/06/26 Kjeldahl Nitrogen 1.62 0.1 0.07 mg/L 1.00 0.612 101 42-154 Matrix Spike Dup (6G02054-MSD1) Source: C6F2067-04 Prepared: 07/02/26 Analyzed: 07/06/26 Kjeldahl Nitrogen 1.40 0.1 0.07 mg/L 1.00 0.612 79 42-154 15 25 Batch 6G06171 - Analyzed as received
Blank (6G06171-BLK1) Prepared & Analyzed: 07/06/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6G06171-BS1) Prepared & Analyzed: 07/06/26
Ammonia-Nitrogen 0.981 0.1 0.06 mg/L 1.00 98 90-110
Matrix Spike (6G06171-MS1) Source: C6F2958-02 Prepared & Analyzed: 07/06/26 Ammonia-Nitrogen 0.984 0.1 0.06 mg/L 1.00 ND 98 80-120
Matrix Spike Dup (6G06171-MSD1) Source: C6F2958-02 Prepared & Analyzed: 07/06/26 Ammonia-Nitrogen 0.996 0.1 0.06 mg/L 1.00 ND 100 80-120 1 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
618
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
Notes and Definitions
J Estimated value
N-BOD1 Dilution water blank exceeds 0.20 mg/L. As per method, data is reportable as qualified.
QFini Follow-up result also did not meet laboratory acceptance criteria.
QFpas Follow-up result within laboratory acceptance criteria.
QMint Due to matrix interference, the MS and/or MSD did not meet laboratory acceptance criteria.
QRPDo The RPD value for the sample duplicate or MS/MSD did not meet laboratory acceptance criteria.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
619
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 10 of 10
Project Name:
13-Jul-2026
Work Order Number: C6G0077
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0077
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
620
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6G0996-01 Liquid 07/8/26 7:39 James Strong Courier
(Monica)-DE
Influent Composite 07/08/26 13:27
C6G0996-02 Liquid 07/8/26 7:32 James Strong Courier
(Monica)-DE
Effluent Composite 07/08/26 13:27
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
621
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Laboratory Reference Number
Sample Description
07/08/26 07:39
Sampled Date/Time Received Date/Time
07/08/26 13:27
Matrix
Influent Liquid
C6G0996-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Suspended Solids 210 10 10 mg/L SM 2540D 07/12/26 19:28 SXA Aggregate Organic Compounds
Biochemical Oxygen Demand 230 50 50 mg/L SM 5210B 07/08/26 23:47 CXR Nutrients
Ammonia-Nitrogen 34 5.0 3.2 mg/L SM 4500NH3 G 07/10/26 10:12 RUB Kjeldahl Nitrogen 43 5.0 3.5 mg/L EPA 351.2 07/14/26 16:20 JXM mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
622
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Laboratory Reference Number
Sample Description
07/08/26 07:32
Sampled Date/Time Received Date/Time
07/08/26 13:27
Matrix
Effluent Liquid
C6G0996-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 1.3 0.20 0.12 mg/L EPA 300.0 07/09/26 02:19 PBS Nitrite as N 0.09 0.1 0.05 mg/L EPA 300.0 07/09/26 02:19 PBS J Solids
Total Suspended Solids 1 0.5 0.5 mg/L SM 2540D 07/12/26 19:28 SXA Aggregate Organic Compounds
Biochemical Oxygen Demand 7.5 5.0 5.0 mg/L SM 5210B 07/08/26 23:48 CXR Nutrients
Ammonia-Nitrogen 4.0 0.5 0.3 mg/L SM 4500NH3 G 07/10/26 13:11 RUB Kjeldahl Nitrogen 4.6 1.0 0.7 mg/L EPA 351.2 07/14/26 18:29 JXM Total Nitrogen 6.0 1.3 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
623
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6G08147 - Analyzed as Received IC
Blank (6G08147-BLK1) Prepared & Analyzed: 07/08/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6G08147-BS1) Prepared & Analyzed: 07/08/26
Nitrite as N 2.42 0.1 0.05 mg/L 2.50 97 90-110
Nitrate as N 5.45 0.20 0.12 mg/L 5.65 96 90-110
Duplicate (6G08147-DUP1) Source: C6G0990-01 Prepared & Analyzed: 07/09/26 Nitrite as N 0.0820 0.1 0.05 mg/L 0.0830 1 20 J
Nitrate as N 11.2 0.20 0.12 mg/L 11.2 0.2 20
Matrix Spike (6G08147-MS1) Source: C6G0990-01 Prepared & Analyzed: 07/09/26 Nitrite as N 2.52 0.1 0.05 mg/L 2.50 0.0830 98 80-120
Nitrate as N 17.2 0.20 0.12 mg/L 5.65 11.2 106 75-131
Matrix Spike (6G08147-MS2) Source: C6G1028-01 Prepared & Analyzed: 07/09/26 Nitrite as N 2.42 0.1 0.05 mg/L 2.50 ND 97 80-120
Nitrate as N 11.6 0.20 0.12 mg/L 5.65 5.55 107 75-131
Matrix Spike Dup (6G08147-MSD1) Source: C6G0990-01 Prepared & Analyzed: 07/09/26 Nitrite as N 2.56 0.1 0.05 mg/L 2.50 0.0830 99 80-120 2 20 Nitrate as N 17.3 0.20 0.12 mg/L 5.65 11.2 107 75-131 0.3 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
624
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6G12149 - Analyzed as received
Blank (6G12149-BLK1) Prepared & Analyzed: 07/12/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6G12149-BS1) Prepared & Analyzed: 07/12/26
Total Suspended Solids 487 5 5 mg/L 500 97 90-110
Duplicate (6G12149-DUP1) Source: C6G1002-01 Prepared & Analyzed: 07/12/26 Total Suspended Solids 178 10 10 mg/L 154 14 25
Duplicate (6G12149-DUP2) Source: C6G1017-01 Prepared & Analyzed: 07/12/26 Total Suspended Solids 332 10 10 mg/L 296 11 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
625
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6G08160 - Analyzed as received
Blank (6G08160-BLK1) Prepared & Analyzed: 07/08/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
Blank (6G08160-BLK2) Prepared & Analyzed: 07/09/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6G08160-BS1) Prepared & Analyzed: 07/08/26
Biochemical Oxygen
Demand
207 50 50 mg/L 198 105 85-115
Duplicate (6G08160-DUP1) Source: C6G0935-02 Prepared & Analyzed: 07/08/26 Biochemical Oxygen
Demand
152 50 50 mg/L 161 6 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
626
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6G10089 - Analyzed as received
Blank (6G10089-BLK1) Prepared & Analyzed: 07/10/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6G10089-BS1) Prepared & Analyzed: 07/10/26
Ammonia-Nitrogen 0.975 0.1 0.06 mg/L 1.00 97 90-110
Matrix Spike (6G10089-MS1) Source: C6G0571-02 Prepared & Analyzed: 07/10/26 Ammonia-Nitrogen 1.58 0.1 0.06 mg/L 1.00 0.654 92 80-120 Matrix Spike Dup (6G10089-MSD1) Source: C6G0571-02 Prepared & Analyzed: 07/10/26 Ammonia-Nitrogen 1.58 0.1 0.06 mg/L 1.00 0.654 92 80-120 0.04 20 Batch 6G10138 - Acid Digest
Blank (6G10138-BLK1) Prepared: 07/13/26 Analyzed: 07/14/26 Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6G10138-BS1) Prepared: 07/13/26 Analyzed: 07/14/26 Kjeldahl Nitrogen 0.978 0.1 0.07 mg/L 1.00 98 80-120
Matrix Spike (6G10138-MS1) Source: C6G0725-01 Prepared: 07/13/26 Analyzed: 07/14/26 Kjeldahl Nitrogen 1.48 0.1 0.07 mg/L 1.00 0.492 99 42-154 Matrix Spike Dup (6G10138-MSD1) Source: C6G0725-01 Prepared: 07/13/26 Analyzed: 07/14/26 Kjeldahl Nitrogen 1.47 0.1 0.07 mg/L 1.00 0.492 98 42-154 1 25 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
627
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
Notes and Definitions
J Estimated value
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
628
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 9
Project Name:
17-Jul-2026
Work Order Number: C6G0996
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G0996
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
629
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6G1873-01 Liquid 07/15/26 6:35 Scott Heller Courier
(Monica)-DE
REVISED: Influent Composite 07/15/26 13:20
C6G1873-02 Liquid 07/15/26 6:20 Scott Heller Courier
(Monica)-DE
REVISED: Effluent Composite 07/15/26 13:20
Included in this Data Package please find an amended report for the work order referenced below.
Work Order: C6G1873-02
Reason for Amendment:
As per client's request, this report has been reissued. Due to a laboratory oversight the MBAS was missed in login, therefore it was analyzed past hold time.
This report supersedes the report issued on 27-July-2026. mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
630
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Laboratory Reference Number
Sample Description
07/15/26 06:35
Sampled Date/Time Received Date/Time
07/15/26 13:20
Matrix
Influent Liquid
C6G1873-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Dissolved Solids 610 10 10 mg/L SM 2540C 07/20/26 22:55 SXA Total Suspended Solids 160 7 7 mg/L SM 2540D 07/20/26 18:16 SXA Aggregate Organic Compounds
Biochemical Oxygen Demand 190 50 50 mg/L SM 5210B 07/15/26 23:25 CXR Nutrients
Ammonia-Nitrogen 31 5.0 3.2 mg/L SM 4500NH3 G 07/17/26 11:49 RUB Kjeldahl Nitrogen 40 5.0 3.5 mg/L EPA 351.2 07/17/26 09:16 JXM mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
631
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Laboratory Reference Number
Sample Description
07/15/26 06:20
Sampled Date/Time Received Date/Time
07/15/26 13:20
Matrix
Effluent Liquid
C6G1873-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 3.6 0.20 0.12 mg/L EPA 300.0 07/16/26 00:04 JXM Nitrite as N 0.06 0.1 0.05 mg/L EPA 300.0 07/16/26 00:04 JXM J Solids
Total Dissolved Solids 540 10 10 mg/L SM 2540C 07/20/26 22:55 SXA Total Suspended Solids 3 0.5 0.5 mg/L SM 2540D 07/20/26 18:16 SXA Aggregate Organic Compounds
Biochemical Oxygen Demand ND 5.0 5.0 mg/L SM 5210B 07/15/26 23:26 CXR Surfactants
MBAS 0.04 0.08 0.02 mg/L SM 5540C 08/20/26 22:19 SXA J, N_HTp Nutrients
Ammonia-Nitrogen ND 0.1 0.06 mg/L SM 4500NH3 G 07/17/26 11:50 RUB Kjeldahl Nitrogen 1.3 0.5 0.4 mg/L EPA 351.2 07/17/26 09:21 JXM Total Nitrogen 4.9 0.80 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
632
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6G15127 - Analyzed as Received IC
Blank (6G15127-BLK1) Prepared & Analyzed: 07/15/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6G15127-BS1) Prepared & Analyzed: 07/15/26
Nitrite as N 2.41 0.1 0.05 mg/L 2.50 97 90-110
Nitrate as N 5.47 0.20 0.12 mg/L 5.65 97 90-110
Matrix Spike (6G15127-MS1) Source: C6G1965-01 Prepared & Analyzed: 07/16/26 Nitrite as N 12.4 0.5 0.3 mg/L 12.5 ND 99 80-120
Nitrate as N 28.3 1.0 0.62 mg/L 28.2 ND 100 75-131
Matrix Spike (6G15127-MS2) Source: C6G1969-01 Prepared & Analyzed: 07/16/26 Nitrite as N 2.60 0.1 0.05 mg/L 2.50 0.127 99 80-120
Nitrate as N 6.25 0.20 0.12 mg/L 5.65 0.457 102 75-131
Matrix Spike Dup (6G15127-MSD1) Source: C6G1965-01 Prepared & Analyzed: 07/16/26 Nitrite as N 12.5 0.5 0.3 mg/L 12.5 ND 100 80-120 1 20
Nitrate as N 28.3 1.0 0.62 mg/L 28.2 ND 100 75-131 0.2 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
633
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6G20172 - Analyzed as received
Blank (6G20172-BLK1) Prepared & Analyzed: 07/20/26
Total Dissolved Solids ND 10 10 mg/L
LCS (6G20172-BS1) Prepared & Analyzed: 07/20/26
Total Dissolved Solids 744 10 10 mg/L 746 100 90-110
Duplicate (6G20172-DUP1) Source: C6G2026-02 Prepared & Analyzed: 07/20/26 Total Dissolved Solids 530 10 10 mg/L 527 0.6 20
Duplicate (6G20172-DUP2) Source: C6G2114-02 Prepared & Analyzed: 07/20/26 Total Dissolved Solids 298 10 10 mg/L 295 1 20
Batch 6G20211 - Analyzed as received
Blank (6G20211-BLK1) Prepared & Analyzed: 07/20/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6G20211-BS1) Prepared & Analyzed: 07/20/26
Total Suspended Solids 526 5 5 mg/L 500 105 90-110
Duplicate (6G20211-DUP1) Source: C6G1941-01 Prepared & Analyzed: 07/20/26 Total Suspended Solids 610 50 50 mg/L 570 7 25
Duplicate (6G20211-DUP2) Source: C6G1988-01 Prepared & Analyzed: 07/20/26 Total Suspended Solids 256 20 20 mg/L 308 18 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
634
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6G15146 - Analyzed as received
Blank (6G15146-BLK1) Prepared & Analyzed: 07/15/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6G15146-BS1) Prepared & Analyzed: 07/15/26
Biochemical Oxygen
Demand
188 50 50 mg/L 198 95 85-115
Duplicate (6G15146-DUP1) Source: C6G1850-01 Prepared & Analyzed: 07/15/26 Biochemical Oxygen
Demand
199 50 50 mg/L 149 29 20 QRPDo
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
635
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Surfactants - Batch Quality Control
Batch 6H20071 - Solvent Extraction.
Blank (6H20071-BLK1) Prepared & Analyzed: 08/20/26
MBAS ND 0.08 0.02 mg/L
LCS (6H20071-BS1) Prepared & Analyzed: 08/20/26
MBAS 0.438 0.08 0.02 mg/L 0.400 110 90-110
Matrix Spike (6H20071-MS1) Source: C6H2405-01 Prepared & Analyzed: 08/20/26 MBAS 0.425 0.20 0.06 mg/L 0.500 ND 85 43-150
Matrix Spike Dup (6H20071-MSD1) Source: C6H2405-01 Prepared & Analyzed: 08/20/26 MBAS 0.508 0.20 0.06 mg/L 0.500 ND 102 43-150 18 30
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
636
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6G16015 - Acid Digest
Blank (6G16015-BLK1) Prepared: 07/16/26 Analyzed: 07/17/26 Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6G16015-BS1) Prepared: 07/16/26 Analyzed: 07/17/26 Kjeldahl Nitrogen 0.886 0.1 0.07 mg/L 1.00 89 80-120
Matrix Spike (6G16015-MS1) Source: C6G1090-02RE1 Prepared: 07/16/26 Analyzed: 07/17/26 Kjeldahl Nitrogen 2.19 0.2 0.2 mg/L 2.50 ND 87 42-154
Matrix Spike Dup (6G16015-MSD1) Source: C6G1090-02RE1 Prepared: 07/16/26 Analyzed: 07/17/26 Kjeldahl Nitrogen 2.34 0.2 0.2 mg/L 2.50 ND 94 42-154 7 25 Batch 6G17072 - Analyzed as received
Blank (6G17072-BLK1) Prepared & Analyzed: 07/17/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6G17072-BS1) Prepared & Analyzed: 07/17/26
Ammonia-Nitrogen 0.995 0.1 0.06 mg/L 1.00 100 90-110
Matrix Spike (6G17072-MS1) Source: C6G1373-02 Prepared & Analyzed: 07/17/26 Ammonia-Nitrogen 1.04 0.1 0.06 mg/L 1.00 0.0644 98 80-120 Matrix Spike Dup (6G17072-MSD1) Source: C6G1373-02 Prepared & Analyzed: 07/17/26 Ammonia-Nitrogen 1.06 0.1 0.06 mg/L 1.00 0.0644 100 80-120 2 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
637
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
Notes and Definitions
J Estimated value
N_HTp Analysis requested near or past holding time. Sample analyzed outside of the EPA recommended holding time.
QRPDo The RPD value for the sample duplicate or MS/MSD did not meet laboratory acceptance criteria.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
638
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 10 of 10
Project Name:
25-Aug-2026
Work Order Number: C6G1873
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP
C6G1873 REVISED
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
639
Mailing Babcock Laboratories, Inc. – Riverside P 951 653 3351 NELAP no. OR4035 6235 River Crest Dr., H 6100 Quail Valley Court F 951 653 1662 CA ELAP no. 2698 Riverside, CA 92502-0432 Riverside, CA 92507-0704 www.babcocklabs.com EPA no. CA00102 09/09/2026
Tristan Hause
Woodard & Curran
19101 Jonathan St
Adelanto, CA 92301
RE: Notification of Nonconformance – MBAS Analysis
Client Sample ID: Effluent Sample Collected 07/15/2026
Babcock Work Order: C6G1873-02
Dear Mr. Hause,
This letter serves as formal notification of a nonconformance associated with the above-referenced work order.
After the client reported a missing MBAS result, Babcock Laboratories reviewed the Chain of Custody (COC) and associated laboratory records. The review confirmed that MBAS analysis had been requested; however, the analysis was inadvertently omitted during sample login and was not entered into the laboratory information management system. The omission was also not identified during review prior to issuance of the original laboratory report.
As a result, the MBAS analysis was not performed within the required holding time. After Babcock confirmed the omission, the client requested that the sample be analyzed outside the required holding time rather than resampled. The analysis was completed, and the result is included in the amended laboratory report with the appropriate qualification indicating that the holding time requirement was exceeded.
All other requested analyses were completed and reported under the referenced Babcock Laboratories work order.
The quality and reliability of the data we provide are of the utmost importance to Babcock Laboratories. We apologize for this oversight and any inconvenience it may have caused.
If you have any questions or require additional information, please contact your Project Manager in Client Services.
Sincerely,
Julia Sudds
Director of Quality
Babcock Laboratories, Inc.
640
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6G2689-01 Liquid 07/22/26 5:38 James Strang Courier
(Guillermo)-DE
Influent Composite 07/22/26 11:21
C6G2689-02 Liquid 07/22/26 5:10 James Strang Courier
(Guillermo)-DE
Effluent Composite 07/22/26 11:21
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
641
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Laboratory Reference Number
Sample Description
07/22/26 05:38
Sampled Date/Time Received Date/Time
07/22/26 11:21
Matrix
Influent Liquid
C6G2689-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Suspended Solids 180 10 10 mg/L SM 2540D 07/27/26 15:04 RUB Aggregate Organic Compounds
Biochemical Oxygen Demand 240 50 50 mg/L SM 5210B 07/22/26 23:18 CXR N-BOD1 Nutrients
Ammonia-Nitrogen 30 5.0 3.2 mg/L SM 4500NH3 G 07/24/26 12:52 RUB Kjeldahl Nitrogen 47 5.0 3.5 mg/L EPA 351.2 07/28/26 16:56 JXM mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
642
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Laboratory Reference Number
Sample Description
07/22/26 05:10
Sampled Date/Time Received Date/Time
07/22/26 11:21
Matrix
Effluent Liquid
C6G2689-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 3.0 0.20 0.12 mg/L EPA 300.0 07/22/26 22:24 PBS Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 07/22/26 22:24 PBS Solids
Total Suspended Solids 0.8 0.5 0.5 mg/L SM 2540D 07/27/26 23:04 SXA Aggregate Organic Compounds
Biochemical Oxygen Demand ND 2.5 2.5 mg/L SM 5210B 07/22/26 23:19 CXR N-BOD1 Nutrients
Ammonia-Nitrogen ND 0.1 0.06 mg/L SM 4500NH3 G 07/24/26 12:53 RUB Kjeldahl Nitrogen 0.9 0.5 0.4 mg/L EPA 351.2 07/28/26 16:57 JXM Total Nitrogen 3.9 0.80 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
643
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6G22139 - Analyzed as Received IC
Blank (6G22139-BLK1) Prepared & Analyzed: 07/22/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6G22139-BS1) Prepared & Analyzed: 07/22/26
Nitrite as N 2.31 0.1 0.05 mg/L 2.50 92 90-110
Nitrate as N 5.33 0.20 0.12 mg/L 5.65 94 90-110
Matrix Spike (6G22139-MS1) Source: C6G2810-02 Prepared & Analyzed: 07/23/26 Nitrite as N 2.21 0.1 0.05 mg/L 2.50 ND 89 80-120
Nitrate as N 5.45 0.20 0.12 mg/L 5.65 ND 96 75-131
Matrix Spike (6G22139-MS2) Source: C6G2810-03 Prepared & Analyzed: 07/23/26 Nitrite as N 2.25 0.1 0.05 mg/L 2.50 ND 90 80-120
Nitrate as N 5.42 0.20 0.12 mg/L 5.65 ND 96 75-131
Matrix Spike Dup (6G22139-MSD1) Source: C6G2810-02 Prepared & Analyzed: 07/23/26 Nitrite as N 2.20 0.1 0.05 mg/L 2.50 ND 88 80-120 0.4 20 Nitrate as N 5.43 0.20 0.12 mg/L 5.65 ND 96 75-131 0.3 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
644
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6G27193 - Analyzed as received
Blank (6G27193-BLK1) Prepared & Analyzed: 07/27/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6G27193-BS1) Prepared & Analyzed: 07/27/26
Total Suspended Solids 478 5 5 mg/L 500 96 90-110
Duplicate (6G27193-DUP1) Source: C6G2689-01 Prepared & Analyzed: 07/27/26 Total Suspended Solids 182 10 10 mg/L 182 0 25
Duplicate (6G27193-DUP2) Source: C6G2752-03 Prepared & Analyzed: 07/27/26 Total Suspended Solids 332 20 20 mg/L 340 2 25
Batch 6G27202 - Analyzed as received
Blank (6G27202-BLK1) Prepared & Analyzed: 07/27/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6G27202-BS1) Prepared & Analyzed: 07/27/26
Total Suspended Solids 496 5 5 mg/L 500 99 90-110
Duplicate (6G27202-DUP1) Source: C6G2665-01 Prepared & Analyzed: 07/27/26 Total Suspended Solids 230 10 10 mg/L 186 21 25
Duplicate (6G27202-DUP2) Source: C6G2828-01 Prepared & Analyzed: 07/27/26 Total Suspended Solids 210 10 10 mg/L 232 10 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
645
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6G22156 - Analyzed as received
Blank (6G22156-BLK1) Prepared & Analyzed: 07/22/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6G22156-BS1) Prepared & Analyzed: 07/22/26
Biochemical Oxygen
Demand
171 50 50 mg/L 198 86 85-115
Duplicate (6G22156-DUP1) Source: C6G2669-04 Prepared & Analyzed: 07/22/26 Biochemical Oxygen
Demand
ND 10 10 mg/L ND 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
646
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6G23068 - Acid Digest
Blank (6G23068-BLK1) Prepared: 07/24/26 Analyzed: 07/28/26 Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6G23068-BS1) Prepared: 07/24/26 Analyzed: 07/28/26 Kjeldahl Nitrogen 1.00 0.1 0.07 mg/L 1.00 100 80-120
Duplicate (6G23068-DUP1) Source: C6G2649-02 Prepared: 07/24/26 Analyzed: 07/28/26 Kjeldahl Nitrogen 1.47 0.1 0.07 mg/L 1.16 24 25
Matrix Spike (6G23068-MS1) Source: C6G2649-02 Prepared: 07/24/26 Analyzed: 07/28/26 Kjeldahl Nitrogen 2.39 0.5 0.4 mg/L 1.00 1.16 123 42-154 Matrix Spike Dup (6G23068-MSD1) Source: C6G2649-02 Prepared: 07/24/26 Analyzed: 07/28/26 Kjeldahl Nitrogen 2.52 0.5 0.4 mg/L 1.00 1.16 136 42-154 5 25 Batch 6G24071 - Analyzed as received
Blank (6G24071-BLK1) Prepared & Analyzed: 07/24/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6G24071-BS1) Prepared & Analyzed: 07/24/26
Ammonia-Nitrogen 0.900 0.1 0.06 mg/L 1.00 90 90-110
Matrix Spike (6G24071-MS1) Source: C6G2582-02 Prepared & Analyzed: 07/24/26 Ammonia-Nitrogen 1.01 0.1 0.06 mg/L 1.00 ND 101 80-120
Matrix Spike Dup (6G24071-MSD1) Source: C6G2582-02 Prepared & Analyzed: 07/24/26 Ammonia-Nitrogen 0.993 0.1 0.06 mg/L 1.00 ND 99 80-120 1 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
647
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
Notes and Definitions
J Estimated value
N-BOD1 Dilution water blank exceeds 0.20 mg/L. As per method, data is reportable as qualified.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
648
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 9
Project Name:
03-Aug-2026
Work Order Number: C6G2689
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G2689
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
649
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6G3464-01 Liquid 07/29/26 7:12 James Strang Courier
(Guillermo)-DE
Influent Composite 07/29/26 11:43
C6G3464-02 Liquid 07/29/26 6:42 James Strang Courier
(Guillermo)-DE
Effluent Composite 07/29/26 11:43
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
650
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Laboratory Reference Number
Sample Description
07/29/26 07:12
Sampled Date/Time Received Date/Time
07/29/26 11:43
Matrix
Influent Liquid
C6G3464-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Suspended Solids 100 5 5 mg/L SM 2540D 08/03/26 22:26 SXA Aggregate Organic Compounds
Biochemical Oxygen Demand 120 20 20 mg/L SM 5210B 07/29/26 22:05 CXR Nutrients
Ammonia-Nitrogen 34 5.0 3.2 mg/L SM 4500NH3 G 07/31/26 09:21 RUB Kjeldahl Nitrogen 49 5.0 3.5 mg/L EPA 351.2 08/05/26 14:01 GMB mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
651
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Laboratory Reference Number
Sample Description
07/29/26 06:42
Sampled Date/Time Received Date/Time
07/29/26 11:43
Matrix
Effluent Liquid
C6G3464-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 1.1 0.20 0.12 mg/L EPA 300.0 07/29/26 23:53 JXM Nitrite as N 0.06 0.1 0.05 mg/L EPA 300.0 07/29/26 23:53 JXM J Solids
Total Suspended Solids 0.7 0.5 0.5 mg/L SM 2540D 08/03/26 22:26 SXA Aggregate Organic Compounds
Biochemical Oxygen Demand ND 5.0 5.0 mg/L SM 5210B 07/29/26 22:07 CXR Nutrients
Ammonia-Nitrogen ND 0.1 0.06 mg/L SM 4500NH3 G 07/31/26 09:22 RUB Kjeldahl Nitrogen 1.5 0.5 0.4 mg/L EPA 351.2 08/05/26 14:03 GMB Total Nitrogen 2.6 0.80 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
652
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6G29127 - Analyzed as Received IC
Blank (6G29127-BLK1) Prepared & Analyzed: 07/29/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6G29127-BS1) Prepared & Analyzed: 07/29/26
Nitrite as N 2.52 0.1 0.05 mg/L 2.50 101 90-110
Nitrate as N 5.58 0.20 0.12 mg/L 5.65 99 90-110
Matrix Spike (6G29127-MS1) Source: C6G3250-03RE1 Prepared & Analyzed: 07/30/26 Nitrite as N 44.9 0.2 0.1 mg/L 5.00 40.1 96 80-120
Nitrate as N 12.2 0.42 0.25 mg/L 11.3 0.794 101 75-131
Matrix Spike (6G29127-MS2) Source: C6G3408-02RE1 Prepared & Analyzed: 07/30/26 Nitrite as N 0.618 0.1 0.05 mg/L 2.50 ND 25 80-120 QFnt, QMout Nitrate as N 7.24 0.20 0.12 mg/L 5.65 ND 128 75-131
Matrix Spike Dup (6G29127-MSD1) Source: C6G3250-03RE1 Prepared & Analyzed: 07/30/26 Nitrite as N 44.7 0.2 0.1 mg/L 5.00 40.1 93 80-120 0.4 20 Nitrate as N 12.3 0.42 0.25 mg/L 11.3 0.794 101 75-131 0.8 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
653
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6H03211 - Analyzed as received
Blank (6H03211-BLK1) Prepared & Analyzed: 08/03/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6H03211-BS1) Prepared & Analyzed: 08/03/26
Total Suspended Solids 508 5 5 mg/L 500 102 90-110
Duplicate (6H03211-DUP1) Source: C6G3443-01 Prepared & Analyzed: 08/03/26 Total Suspended Solids 202 10 10 mg/L 210 4 25
Duplicate (6H03211-DUP2) Source: C6G3468-02 Prepared & Analyzed: 08/03/26 Total Suspended Solids 728 20 436 25 QFpas,
QMout
20 mg/L 50
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
654
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6G29146 - Analyzed as received
Blank (6G29146-BLK1) Prepared & Analyzed: 07/29/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
Blank (6G29146-BLK2) Prepared & Analyzed: 07/29/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6G29146-BS1) Prepared & Analyzed: 07/29/26
Biochemical Oxygen
Demand
187 50 50 mg/L 198 95 85-115
Duplicate (6G29146-DUP1) Source: C6G3429-01 Prepared & Analyzed: 07/29/26 Biochemical Oxygen
Demand
69.6 20 20 mg/L 43.7 46 20 QRPDo
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
655
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6G31064 - Analyzed as received
Blank (6G31064-BLK1) Prepared & Analyzed: 07/31/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6G31064-BS1) Prepared & Analyzed: 07/31/26
Ammonia-Nitrogen 0.954 0.1 0.06 mg/L 1.00 95 90-110
Matrix Spike (6G31064-MS1) Source: C6G3385-01 Prepared & Analyzed: 07/31/26 Ammonia-Nitrogen 0.909 0.1 0.06 mg/L 1.00 ND 91 80-120
Matrix Spike Dup (6G31064-MSD1) Source: C6G3385-01 Prepared & Analyzed: 07/31/26 Ammonia-Nitrogen 0.932 0.1 0.06 mg/L 1.00 ND 93 80-120 3 20 Batch 6H03186 - Acid Digest
Blank (6H03186-BLK1) Prepared & Analyzed: 08/05/26
Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6H03186-BS1) Prepared & Analyzed: 08/05/26
Kjeldahl Nitrogen 0.922 0.1 0.07 mg/L 1.00 92 90-110
Duplicate (6H03186-DUP1) Source: C6G2853-02 Prepared & Analyzed: 08/05/26 Kjeldahl Nitrogen 0.715 0.1 0.07 mg/L 0.621 14 20
Matrix Spike (6H03186-MS1) Source: C6G2853-02 Prepared & Analyzed: 08/05/26 Kjeldahl Nitrogen 1.63 0.1 0.07 mg/L 1.00 0.621 101 80-120 Matrix Spike Dup (6H03186-MSD1) Source: C6G2853-02 Prepared & Analyzed: 08/05/26 Kjeldahl Nitrogen 1.56 0.1 0.07 mg/L 1.00 0.621 93 80-120 5 25 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
656
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
Notes and Definitions
J Estimated value
QFnt The referenced sample did not require this QC analyte, so a follow-up is not needed.
QFpas Follow-up result within laboratory acceptance criteria.
QMout MS and/or MSD recovery did not meet laboratory acceptance criteria.
QRPDo The RPD value for the sample duplicate or MS/MSD did not meet laboratory acceptance criteria.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
657
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 9
Project Name:
11-Aug-2026
Work Order Number: C6G3464
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6G3464
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
658
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6G1948-01 Sludge 07/15/26 8:40 Scott Heller Courier
(Monica)-DE
Bio-Solids 07/15/26 13:20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
659
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Laboratory Reference Number
Sample Description
07/15/26 08:40
Sampled Date/Time Received Date/Time
07/15/26 13:20
Matrix
Bio-Solids Sludge
C6G1948-01
Analyte(s) Result RDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N ND 10 mg/kg dry EPA 300.0 07/18/26 05:11 JXM N_WEX Nitrite as N ND 5.2 mg/kg dry EPA 300.0 07/18/26 05:11 JXM N_WEX Solids
Total Solids 19 0.10 % SM 2540G 07/17/26 14:54 RUB
Nutrients
Ammonia-Nitrogen ND 4800 mg/Kg* dry SM4500NH3H
G
07/24/26 13:18 RUB N_WEX
Kjeldahl Nitrogen 94000 10000 mg/kg dry EPA 351.2 07/22/26 08:32 JXM Metals and Metalloids; EPA SW846 Series
Aluminum 2300 10 mg/kg dry EPA 6010B 07/21/26 01:04 MGA Antimony 1.6 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Arsenic 5.0 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Barium 170 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Beryllium ND 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Boron 94 50 mg/kg dry EPA 6010B 07/21/26 01:04 MGA
Cadmium ND 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Total Chromium 22 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH Cobalt ND 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Copper 470 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Iron 4100 20 mg/kg dry EPA 6010B 07/21/26 01:04 MGA
Lead 2.4 2.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Manganese 290 10 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Mercury ND 0.52 mg/kg dry EPA 7471A 07/20/26 14:47 JTR
Molybdenum 13 5.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH Nickel 7.3 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Selenium ND 5.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Thallium ND 1.0 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Vanadium 38 10 mg/kg dry EPA 6020 07/20/26 11:49 AJH
Zinc 220 10 mg/kg dry EPA 6020 07/20/26 11:49 AJH
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
660
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Laboratory Reference Number
Sample Description
07/15/26 08:40
Sampled Date/Time Received Date/Time
07/15/26 13:20
Matrix
Bio-Solids Sludge
C6G1948-01
Analyte(s) Result RDL Units Method Analysis Date Analyst Flag Multiple Tube Fermentation - Multiple Dilution - SM 9221 B, E, F series Total Coliform 1.1E7 93000 MPN/g dry SM 9221B 07/15/26 15:35 VXR Fecal Coliform 5700000 93000 MPN/g dry SM 9221E 07/15/26 15:35 VXR * NELAP does not offer accreditation for this analyte/method/matrix combination mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
661
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6G17146 - Analyzed as Received IC
Blank (6G17146-BLK1) Prepared & Analyzed: 07/18/26
Nitrite as N ND 1.0 mg/kg wet
Nitrate as N ND 2.0 mg/kg wet
LCS (6G17146-BS1) Prepared & Analyzed: 07/18/26
Nitrite as N 24.0 1.0 mg/kg wet 24.8 97 90-110
Nitrate as N 54.8 2.0 mg/kg wet 56.0 98 90-110
Matrix Spike (6G17146-MS1) Source: C6G1893-01 Prepared & Analyzed: 07/18/26 Nitrite as N 23.9 1.2 mg/kg dry 28.3 ND 84 62-121
Nitrate as N 58.1 2.3 mg/kg dry 64.0 3.80 85 80-120
Matrix Spike Dup (6G17146-MSD1) Source: C6G1893-01 Prepared & Analyzed: 07/18/26 Nitrite as N 26.3 1.2 mg/kg dry 28.7 ND 91 62-121 9 20
Nitrate as N 61.4 2.3 mg/kg dry 64.9 3.80 89 80-120 6 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
662
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6G17123 - Analyzed as received
Blank (6G17123-BLK1) Prepared & Analyzed: 07/17/26
Total Solids ND 0.10 %
Duplicate (6G17123-DUP1) Source: C6G2175-01 Prepared & Analyzed: 07/17/26 Total Solids 2.2 0.10 % 2.2 0.2 25
Duplicate (6G17123-DUP2) Source: C6G2175-02 Prepared & Analyzed: 07/17/26 Total Solids 2.1 0.10 % 2.1 0.2 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
663
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6G17135 - Acid Digest
Blank (6G17135-BLK1) Prepared: 07/21/26 Analyzed: 07/22/26 Kjeldahl Nitrogen ND 100 mg/kg wet
LCS (6G17135-BS1) Prepared: 07/21/26 Analyzed: 07/22/26 Kjeldahl Nitrogen 998 100 mg/kg wet 971 103 80-120
Duplicate (6G17135-DUP1) Source: C6G2194-01 Prepared: 07/21/26 Analyzed: 07/22/26 Kjeldahl Nitrogen 1280 500 mg/kg wet 1330 4 25
Batch 6G24073 - Analyzed as received
Blank (6G24073-BLK1) Prepared & Analyzed: 07/24/26
Ammonia-Nitrogen ND 1.0 mg/Kg* wet
LCS (6G24073-BS1) Prepared & Analyzed: 07/24/26
Ammonia-Nitrogen 0.931 1.0 mg/Kg* wet 1.00 93 90-110
Matrix Spike (6G24073-MS1) Source: C6G1948-01 Prepared & Analyzed: 07/24/26 Ammonia-Nitrogen 3230 5100 mg/Kg* dry 509 2750 95 80-120 Matrix Spike Dup (6G24073-MSD1) Source: C6G1948-01 Prepared & Analyzed: 07/24/26 Ammonia-Nitrogen 3160 5200 mg/Kg* dry 516 2750 79 80-120 2 20 QMS(D) mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
664
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Metals and Metalloids; EPA SW846 Series - Batch Quality Control Batch 6G16046 - EPA 3050B
Blank (6G16046-BLK1) Prepared: 07/17/26 Analyzed: 07/20/26 Antimony ND 1.0 mg/kg wet
Arsenic ND 1.0 mg/kg wet
Barium ND 1.0 mg/kg wet
Beryllium ND 1.0 mg/kg wet
Cadmium ND 1.0 mg/kg wet
Total Chromium ND 1.0 mg/kg wet
Cobalt ND 1.0 mg/kg wet
Copper ND 1.0 mg/kg wet
Lead ND 2.0 mg/kg wet
Manganese ND 10 mg/kg wet
Molybdenum ND 5.0 mg/kg wet
Nickel ND 1.0 mg/kg wet
Selenium ND 5.0 mg/kg wet
Thallium ND 1.0 mg/kg wet
Vanadium ND 10 mg/kg wet
Zinc ND 10 mg/kg wet
LCS (6G16046-BS1) Prepared: 07/17/26 Analyzed: 07/20/26 Antimony 54.1 1.0 mg/kg wet 50.0 108 79-132
Arsenic 51.2 1.0 mg/kg wet 50.0 102 80-127
Barium 56.9 1.0 mg/kg wet 50.0 114 80-120
Beryllium 51.7 1.0 mg/kg wet 50.0 103 79-124
Cadmium 51.2 1.0 mg/kg wet 50.0 102 80-122
Total Chromium 55.0 1.0 mg/kg wet 50.0 110 81-118
Cobalt 55.2 1.0 mg/kg wet 50.0 110 80-124
Copper 54.0 1.0 mg/kg wet 50.0 108 80-117
Lead 49.8 2.0 mg/kg wet 50.0 100 82-124
Manganese 55.6 10 mg/kg wet 50.0 111 84-122
Molybdenum 56.2 5.0 mg/kg wet 50.0 112 82-130
Nickel 54.1 1.0 mg/kg wet 50.0 108 81-117
Selenium 46.6 5.0 mg/kg wet 50.0 93 76-144
Thallium 52.6 1.0 mg/kg wet 50.0 105 75-118
Vanadium 56.0 10 mg/kg wet 50.0 112 82-122
Zinc 50.9 10 mg/kg wet 50.0 102 75-124
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
665
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Metals and Metalloids; EPA SW846 Series - Batch Quality Control Batch 6G16046 - EPA 3050B
Duplicate (6G16046-DUP1) Source: C6G1076-01 Prepared: 07/17/26 Analyzed: 07/20/26 Antimony 2.19 1.0 mg/kg dry 2.18 0.5 20
Arsenic 4.08 1.0 mg/kg dry 3.66 11 20
Barium 443 1.0 mg/kg dry 400 10 20
Beryllium ND 1.0 mg/kg dry ND 20
Cadmium 0.889 1.0 mg/kg dry 0.770 14 20
Total Chromium 24.6 1.0 mg/kg dry 21.7 12 20
Cobalt 2.96 1.0 mg/kg dry 2.57 14 20
Copper 355 1.0 mg/kg dry 316 12 20
Lead 6.15 2.0 mg/kg dry 6.02 2 20
Manganese 95.0 10 mg/kg dry 86.5 9 20
Molybdenum 9.82 5.0 mg/kg dry 8.49 14 20
Nickel 19.6 1.0 mg/kg dry 17.0 14 20
Selenium 7.55 5.0 mg/kg dry 6.89 9 20
Thallium ND 1.0 mg/kg dry ND 20
Vanadium 44.1 10 mg/kg dry 38.2 14 20
Zinc 929 10 mg/kg dry 829 11 20
Duplicate (6G16046-DUP2) Source: C6G1076-01 Prepared: 07/17/26 Analyzed: 07/20/26 Antimony ND 5.0 mg/kg dry ND 20
Arsenic 3.68 5.0 mg/kg dry 3.66 0.4 20
Barium 388 5.0 mg/kg dry 400 3 20
Beryllium ND 5.0 mg/kg dry ND 20
Cadmium ND 5.0 mg/kg dry ND 20
Total Chromium 22.2 5.0 mg/kg dry 21.7 2 20
Cobalt 2.72 5.0 mg/kg dry 2.57 6 20
Copper 324 5.0 mg/kg dry 316 2 20
Lead 5.71 10 mg/kg dry 6.02 5 20
Manganese 86.0 50 mg/kg dry 86.5 0.6 20
Molybdenum 8.89 25 mg/kg dry 8.49 5 20
Nickel 17.9 5.0 mg/kg dry 17.0 5 20
Selenium 6.99 25 mg/kg dry 6.89 2 20
Thallium ND 5.0 mg/kg dry ND 20
Vanadium 38.9 50 mg/kg dry 38.2 2 20
Zinc 876 50 mg/kg dry 829 6 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
666
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Metals and Metalloids; EPA SW846 Series - Batch Quality Control Batch 6G16046 - EPA 3050B
Matrix Spike (6G16046-MS1) Source: C6G1076-01 Prepared: 07/17/26 Analyzed: 07/20/26 Antimony 45.5 1.0 mg/kg dry 54.8 2.18 79 10-156
Arsenic 58.0 1.0 mg/kg dry 54.8 3.66 99 77-131
Barium 464 1.0 mg/kg dry 54.8 400 117 61-132
Beryllium 54.2 1.0 mg/kg dry 54.8 ND 99 68-128
Cadmium 54.6 1.0 mg/kg dry 54.8 0.770 98 72-121
Total Chromium 79.7 1.0 mg/kg dry 54.8 21.7 106 60-129
Cobalt 58.9 1.0 mg/kg dry 54.8 2.57 103 64-128
Copper 383 1.0 mg/kg dry 54.8 316 121 36-141
Lead 58.1 2.0 mg/kg dry 54.8 6.02 95 60-126
Manganese 146 10 mg/kg dry 54.8 86.5 108 63-135
Molybdenum 67.4 5.0 mg/kg dry 54.8 8.49 107 60-140
Nickel 72.7 1.0 mg/kg dry 54.8 17.0 101 60-135
Selenium 58.0 5.0 mg/kg dry 54.8 6.89 93 73-141
Thallium 54.6 1.0 mg/kg dry 54.8 ND 100 57-122
Vanadium 98.8 10 mg/kg dry 54.8 38.2 111 66-136
Zinc 914 10 mg/kg dry 54.8 829 156 26-166
Matrix Spike Dup (6G16046-MSD1) Source: C6G1076-01 Prepared: 07/17/26 Analyzed: 07/20/26 Antimony 47.3 1.0 mg/kg dry 54.8 2.18 82 10-156 4 20
Arsenic 57.7 1.0 mg/kg dry 54.8 3.66 99 77-131 0.5 20
Barium 470 1.0 mg/kg dry 54.8 400 128 61-132 1 20
Beryllium 54.3 1.0 mg/kg dry 54.8 ND 99 68-128 0.2 20
Cadmium 54.5 1.0 mg/kg dry 54.8 0.770 98 72-121 0.3 20
Total Chromium 80.1 1.0 mg/kg dry 54.8 21.7 107 60-129 0.5 20 Cobalt 59.1 1.0 mg/kg dry 54.8 2.57 103 64-128 0.3 20
Copper 378 1.0 mg/kg dry 54.8 316 112 36-141 1 20
Lead 58.0 2.0 mg/kg dry 54.8 6.02 95 60-126 0.3 20
Manganese 147 10 mg/kg dry 54.8 86.5 110 63-135 0.7 20
Molybdenum 67.4 5.0 mg/kg dry 54.8 8.49 108 60-140 0.03 20 Nickel 73.8 1.0 mg/kg dry 54.8 17.0 104 60-135 2 20
Selenium 58.5 5.0 mg/kg dry 54.8 6.89 94 73-141 0.9 20
Thallium 54.4 1.0 mg/kg dry 54.8 ND 99 57-122 0.3 20
Vanadium 97.6 10 mg/kg dry 54.8 38.2 109 66-136 1 20
Zinc 915 10 mg/kg dry 54.8 829 158 26-166 0.06 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
667
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 10 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Metals and Metalloids; EPA SW846 Series - Batch Quality Control Batch 6G17076 - EPA 3050B
Blank (6G17076-BLK1) Prepared: 07/17/26 Analyzed: 07/21/26 Aluminum 18.2 10 mg/kg wet QBLK
Boron ND 50 mg/kg wet
Iron ND 20 mg/kg wet
LCS (6G17076-BS1) Prepared: 07/17/26 Analyzed: 07/21/26 Aluminum 1050 10 mg/kg wet 1050 100 72-120
Boron 199 50 mg/kg wet 200 99 72-120
Iron 1040 20 mg/kg wet 1050 99 80-120
Matrix Spike (6G17076-MS1) Source: C6G1076-01 Prepared: 07/17/26 Analyzed: 07/21/26 Aluminum 3960 10 mg/kg dry 1150 3220 64 61-121
Boron 338 50 mg/kg dry 219 140 90 70-130
Iron 24700 20 mg/kg dry 1150 30500 NR 36-178 QFnt, QMout Matrix Spike Dup (6G17076-MSD1) Source: C6G1076-01 Prepared: 07/17/26 Analyzed: 07/21/26 Aluminum 3800 10 mg/kg dry 1150 3220 51 61-121 4 25 QMS(D) Boron 327 50 mg/kg dry 219 140 85 70-130 3 25
Iron 23900 20 mg/kg dry 1150 30500 NR 36-178 3 25 QFnt, QMout Batch 6G20183 - EPA 7471A
Blank (6G20183-BLK1) Prepared & Analyzed: 07/20/26
Mercury ND 0.050 mg/kg wet
LCS (6G20183-BS1) Prepared & Analyzed: 07/20/26
Mercury 0.198 0.050 mg/kg wet 0.200 99 77-115
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
668
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 11 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Metals and Metalloids; EPA SW846 Series - Batch Quality Control Batch 6G20183 - EPA 7471A
Matrix Spike (6G20183-MS1) Source: C6G1948-01 Prepared & Analyzed: 07/20/26 Mercury 1.70 0.52 mg/kg dry 2.08 ND 82 22-150
Matrix Spike Dup (6G20183-MSD1) Source: C6G1948-01 Prepared & Analyzed: 07/20/26 Mercury 1.80 0.52 mg/kg dry 2.07 ND 87 22-150 6 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
669
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 12 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
Notes and Definitions
N_WEX Analyte determined on a 1:10 water extract from the sample.
QBLK The method blank did not meet laboratory acceptance criteria.
QFnt The referenced sample did not require this QC analyte, so a follow-up is not needed.
QMout MS and/or MSD recovery did not meet laboratory acceptance criteria.
QMS(D) Matrix spike recovery was out of acceptance criteria. Precision and accuracy demonstrated by remaining matrix spike results.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
670
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 13 of 13
Project Name:
28-Jul-2026
Work Order Number: C6G1948
Received on Ice (Y/N): Yes Temp: 4 °C
W&C - Adelanto Quarterly Solids J/A/J/O
Adelanto WWTP - 19101 Jonathan St.
C6G1948
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
671
Client Name:
Report Date:
Adelanto, CA 92301
Contact:
Address:
28-Jul-2026
Analytical Report:
Project Number:
Project Name:
Work Order Number:
Received on Ice (Y/N): Yes Temp: 4 °C
Woodard & Curran
Dutch Hause
P.O. Box 506
W&C - Adelanto Quarterly Solids
J/A/J/O
Adelanto WWTP 19101 Jonathan
St.
C6G1952
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Lab Sample # Client Sample ID Matrix Date Sampled
Sample Identification
By Date Submitted By
C6G1952-01 Sludge 7/15/26 8:40 Scott Heller 7/15/26 13:20 Courier (Monica)-DE
Bio-Solids ---ROUTINE---
Note: The requested analysis for Cr6 was subcontracted to Eurofins Calscience. e-Case Narrative+ COC.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
672
Client Name:
Report Date:
Adelanto, CA 92301
Contact:
Address:
28-Jul-2026
Analytical Report:
Project Number:
Project Name:
Work Order Number:
Received on Ice (Y/N): Yes Temp: 4 °C
Woodard & Curran
Dutch Hause
P.O. Box 506
W&C - Adelanto Quarterly Solids
J/A/J/O
Adelanto WWTP 19101 Jonathan
St.
C6G1952
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
673
ANALYTICAL REPORT
PREPARED FOR
Attn: Cindy A Waddell
Babcock Laboratories, Inc.
6100 Quail Valley Court
Riverside, California 92507
Generated 7/22/2026 4:53:40 PM
JOB DESCRIPTION
C6G1952
JOB NUMBER
570-288099-1
See page two for job notes and contact information.
Tustin CA 92780
Suite 100
2841 Dow Avenue
Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
674
Eurofins Calscience
Eurofins Calscience is a laboratory within Eurofins Environment Testing Southwest, LLC, a company within Eurofins Environment Testing Group of Companies Job Notes
This report may not be reproduced except in full, and with written approval from the laboratory. The results relate only to the samples tested. For questions please contact the Project Manager at the e-mail address or telephone number listed on this page.
The test results in this report relate only to the samples as received by the laboratory and will meet all requirements of the methodology, with any exceptions noted. This report shall not be reproduced except in full, without the express written approval of the laboratory. All questions should be directed to the Eurofins Calscience Project Manager.
Authorization
Generated
7/22/2026 4:53:40 PM
Authorized for release by
Carla Hollowell, Project Manager I
[email protected]
(714)895-5494
1 2
3 4
5 6
7 8
9 10
11 12
675
Table of Contents
Client: Babcock Laboratories, Inc.
Project/Site: C6G1952
Laboratory Job ID: 570-288099-1
Eurofins Calscience
7/22/2026
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Definitions/Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Case Narrative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Client Sample Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 QC Sample Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Lab Chronicle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Certification Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Method Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Sample Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Chain of Custody . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Receipt Checklists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 1 2
3 4
5 6
7 8
9 10
11 12
676
Definitions/Glossary
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project/Site: C6G1952
Glossary
These commonly used abbreviations may or may not be present in this report. ☼ Listed under the "D" column to designate that the result is reported on a dry weight basis Abbreviation
%R Percent Recovery
CFL Contains Free Liquid
CFU Colony Forming Unit
CNF Contains No Free Liquid
DER Duplicate Error Ratio (normalized absolute difference) Dil Fac Dilution Factor
DL Detection Limit (DoD/DOE)
DL, RA, RE, IN Indicates a Dilution, Re-analysis, Re-extraction, or additional Initial metals/anion analysis of the sample DLC Decision Level Concentration (Radiochemistry)
EDL Estimated Detection Limit (Dioxin)
LOD Limit of Detection (DoD/DOE)
LOQ Limit of Quantitation (DoD/DOE)
MCL EPA recommended "Maximum Contaminant Level"
MDA Minimum Detectable Activity (Radiochemistry)
MDC Minimum Detectable Concentration (Radiochemistry)
MDL Method Detection Limit
ML Minimum Level (Dioxin)
MPN Most Probable Number
MQL Method Quantitation Limit
NC Not Calculated
ND Not Detected at the reporting limit (or MDL or EDL if shown) NEG Negative / Absent
POS Positive / Present
PQL Practical Quantitation Limit
PRES Presumptive
QC Quality Control
RER Relative Error Ratio (Radiochemistry)
RL Reporting Limit or Requested Limit (Radiochemistry)
RPD Relative Percent Difference, a measure of the relative difference between two points TEF Toxicity Equivalent Factor (Dioxin)
TEQ Toxicity Equivalent Quotient (Dioxin)
TNTC Too Numerous To Count
Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
677
Job Narrative
570-288099-1
The analytical test results presented in this report meet all requirements of the associated regulatory program listed on the Accreditation/Certification Summary Page, unless otherwise noted. Data qualifiers and/or narrative comments are included to explain any exceptions, if applicable. Regulated compliance samples (e.g. SDWA, NPDES) must comply with associated agency requirements/permits.
· Matrix-specific batch QC (e.g., MS, MSD, SD) may not be reported when insufficient sample volume is available or when sitespecific QC samples are not submitted. In such cases, a Laboratory Control Sample Duplicate (LCSD) may be analyzed to provide precision data for the batch.
· For samples analyzed using surrogate and/or isotope dilution analytes, any recoveries falling outside of established acceptance criteria are re-prepared and/or re-analyzed to confirm results, unless the deviation is due to sample dilution or otherwise explained in the case narrative.
Receipt
The sample was received on 7/17/2026 9:55 AM. Unless otherwise noted below, the sample arrived in good condition, and, where required, properly preserved and on ice. The temperature of the cooler at receipt time was 3.9°C.
General Chemistry
Method 7196A: The following sample was diluted due to the nature of the sample matrix: C6G1952-01 (570-288099-1). Elevated reporting limits (RLs) are provided.
No additional analytical or quality issues were noted, other than those described above or in the Definitions/ Glossary page.
Case Narrative
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project: C6G1952
Eurofins Calscience
Job ID: 570-288099-1 Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
678
Client Sample Results
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project/Site: C6G1952
General Chemistry
Client Sample ID: C6G1952-01 Lab Sample ID: 570-288099-1 Date Collected: 07/15/26 08:40 Matrix: Solid
Date Received: 07/17/26 09:55
RL MDL
ND 42.9 13.0 mg/Kg ☼ 07/17/26 16:16 07/20/26 23:47 10
Analyte Result Qualifier Unit D Prepared Analyzed Dil Fac Cr (VI) (SW846 7196A)
Percent Solids (EPA Moisture) 18.5 0.1 0.1 % 07/20/26 11:34 1 Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
679
QC Sample Results
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project/Site: C6G1952
Method: 7196A - Chromium, Hexavalent
Lab Sample ID: MB 570-770052/1-A Client Sample ID: Method Blank Matrix: Solid Prep Type: Total/NA
Analysis Batch: 771682 Prep Batch: 770052
RL MDL
Cr (VI) ND 0.800 0.241 mg/Kg 07/16/26 17:31 07/20/26 23:19 1 MB MB
Analyte Result Qualifier Unit D Prepared Analyzed Dil Fac Lab Sample ID: LCS 570-770052/2-A Client Sample ID: Lab Control Sample Matrix: Solid Prep Type: Total/NA
Analysis Batch: 771682 Prep Batch: 770052
Cr (VI) 19.8 20.58 mg/Kg
Analyte
LCS LCS
Result Qualifier Unit
Spike
Added
104 80 - 120
D %Rec
%Rec
Limits
Lab Sample ID: LCSD 570-770052/3-A Client Sample ID: Lab Control Sample Dup Matrix: Solid Prep Type: Total/NA
Analysis Batch: 771682 Prep Batch: 770052
Cr (VI) 20.0 20.18 mg/Kg 2 20
Analyte
LCSD LCSD
Result Qualifier Unit
Spike
Added RPD Limit
RPD
101 80 - 120
D %Rec
%Rec
Limits
Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
680
Lab Chronicle
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project/Site: C6G1952
Client Sample ID: C6G1952-01 Lab Sample ID: 570-288099-1 Date Collected: 07/15/26 08:40 Matrix: Solid
Date Received: 07/17/26 09:55
Prep 3060A 770052 07/17/26 16:16 JXO4 EET CAL 4
Type
Batch
Method
Batch
Prep Type Run Analyst Lab
Prepared
or Analyzed
Initial
Amount Amount
Final Batch
Factor Number
Dil
Total/NA 1.26 g 50 mL
Total/NA Analysis 7196A 10 10 mL 10 mL 771682 07/20/26 23:47 JXO4 EET CAL 4 Instrument ID: UV8
Total/NA Analysis Moisture 1 771366 07/20/26 11:34 N9ZN EET CAL 4 Instrument ID: BAL66
Laboratory References:
EET CAL 4 = Eurofins Calscience Tustin, 2841 Dow Avenue, Tustin, CA 92780, TEL (714)895-5494 Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
681
Accreditation/Certification Summary
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project/Site: C6G1952
Laboratory: Eurofins Calscience
Unless otherwise noted, all analytes for this laboratory were covered under each accreditation/certification below.
Authority Program Identification Number Expiration Date California State 3082 07-31-28
Analysis Method Prep Method Matrix Analyte
The following analytes are included in this report, but the laboratory is not certified by California State 3082. This list may include analytes for which the agency does not offer certification :
Moisture Solid Percent Solids
Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
682
Method Summary
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project/Site: C6G1952
Method Method Description Protocol Laboratory
7196A Chromium, Hexavalent SW846 EET CAL 4
Moisture Percent Moisture EPA EET CAL 4
3060A Alkaline Digestion (Chromium, Hexavalent) SW846 EET CAL 4 Protocol References:
EPA = US Environmental Protection Agency
SW846 = "Test Methods For Evaluating Solid Waste, Physical/Chemical Methods", Third Edition, November 1986 And Its Updates.
Laboratory References:
EET CAL 4 = Eurofins Calscience Tustin, 2841 Dow Avenue, Tustin, CA 92780, TEL (714)895-5494 Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
683
Sample Summary
Client: Babcock Laboratories, Inc. Job ID: 570-288099-1 Project/Site: C6G1952
Lab Sample ID Client Sample ID Matrix Collected Received Sample Origin 570-288099-1 C6G1952-01 Solid 07/15/26 08:40 07/17/26 09:55 California Eurofins Calscience
1 2
3 4
5 6
7 8
9 10
11 12
684
1 2
3 4
5 6
7 8
9 10
11 12
685
1 2
3 4
5 6
7 8
9 10
11 12
686
Login Sample Receipt Checklist
Client: Babcock Laboratories, Inc. Job Number: 570-288099-1 Login Number: 288099
Question Answer Comment
Creator: Ablian, Samantha
List Source: Eurofins Calscience
List Number: 1
Radioactivity wasn't checked or is </= background as measured by a survey N/A meter.
The cooler's custody seal, if present, is intact. True
Sample custody seals, if present, are intact. True
The cooler or samples do not appear to have been compromised or True tampered with.
Samples were received on ice. True
Cooler Temperature is acceptable. True
Cooler Temperature is recorded. True
COC is present. True
COC is filled out in ink and legible. True
COC is filled out with all pertinent information. True
Is the Field Sampler's name present on COC? N/A Received project as a subcontract.
There are no discrepancies between the containers received and the COC. True Samples are received within Holding Time (excluding tests with immediate True HTs)
Sample containers have legible labels. True
Containers are not broken or leaking. True
Sample collection date/times are provided. True
Appropriate sample containers are used. True
Sample bottles are completely filled. True
Sample Preservation Verified. True
There is sufficient vol. for all requested analyses, incl. any requested True MS/MSDs
Containers requiring zero headspace have no headspace or bubble is True <6mm (1/4").
Multiphasic samples are not present. True
Samples do not require splitting or compositing. True
Residual Chlorine Checked. N/A
Eurofins Calscience Page 14 of 14 7/22/2026
1 2
3 4
5 6
7 8
9 10
11 12
687
ADELANTO PUBLIC UTILITY AUTHORITY
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: October 14, 2026
TO: Honorable Chairman, and Public Utility Authority Members FROM: Jessie Flores, Executive Director
BY: Chris McMahon, Woodard & Curran, Area Manager/ Senior Principal SUBJECT: RECEIVE AND FILE THE WASTERWATER DEPARTMENT MONTHYLY REPORT – AUGUST 2026
STAFF RECOMMENDATION:
Receive and File the Wastewater Department Monthly Report.
ATTACHMENTS:
1. Wastewater Department Monthly Report – AUGUST 2026
688
City of Adelanto 1 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
Table of Contents
Wastewater Department
Monthly Operating Report
August 2026
689
City of Adelanto 2 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
Section Page No.
1. Executive Summary ……………………………………………………… 3
2. Health & Safety ……………………………………………………… 4
3. Regulatory Compliance ……………………………………………………… 5
4. WWTP Operations ……………………………………………………… 6
4.1. Flow & Loading ……………………………………………………… 6
4.2. Bio-Solids Report ……………………………………………………… 7
5. Collection System Management ……………………………………………………… 8
6. Industrial Pretreatment Program ……………………………………………………… 11
7. Maintenance & Repair ……………………………………………………… 12
8. Personnel ……………………………………………………… 14
9. Financial Overview ……………………………………………………… 15
Attachments:
1. Maintenance History Report
2. Adelanto WWTP Summary Report
3. Monthly Laboratory Analysis
690
City of Adelanto 3 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
1. Executive Summary
During August 2026, the City of Adelanto Wastewater Treatment Plant (WWTP) and collection system maintained full regulatory compliance and recorded no sanitary sewer overflows (SSOs). Treatment and collection services remained reliable while staff advanced safety corrections, preventive maintenance, asset management, and system monitoring.
Compliance Wastewater Treated Collection System Safety & Maintenance 100% compliant
0 permit violations
105.245 MG total
3.395 MGD average
0 SSOs
9,005 LF cleaned
15,300 LF inspected
60.5% audit completion
89 PMs completed
Operational Highlights
All required sampling was completed and the facility maintained 100% regulatory compliance.
Monthly mean effluent results were 6.8 mg/L BOD, 0.17 mg/L MBAS, and 1.7 mg/L Total Nitrogen, each below the applicable monthly mean limit.
The WWTP treated 105.245 million gallons during August, averaging 3.395 MGD. Peak flow reached 3,570 GPM on August 24.
The collection system recorded zero SSOs for August and year-to-date. Crews cleaned 9,005 linear feet and completed 15,300 linear feet of CCTV inspection, increasing annual totals to 60,292 feet cleaned and 35,861 feet inspected.
SmartCover monitoring generated no high-level alarms; however, monitoring indicates the Auburn and Verbena location remained full with limited additional sewer capacity, warranting continued operational attention.
Safety, Reliability, and Asset Management
The Adelanto team remained compliant with SPARKS requirements and has completed 101 of 167 Startup Safety Audit actions, or 60.5%. August safety training focused on preventing back injuries. Operations staff restored controls after communication errors affected the aeration blowers, Biolac system, and headworks; repaired the facility backflow device; and continued troubleshooting final-clarifier sludge-depth sensors.
RAS Pump No. 1 was removed from service following a seal leak, with RAS Pump No. 2 placed in service. Staff also reprogrammed the primary centrifuge VFD after a memory issue erased system programming. Utility Cloud is fully implemented and continues to support maintenance and asset tracking.
Financial Summary
Updated budget-to-actual reporting was unavailable because financial data is being migrated, validated, and reconciled during Woodard & Curran’s ERP transition to a new software platform.
Bottom Line
August operations were stable and compliant, with zero SSOs, strong effluent performance, expanded collection-system inspection, and continued progress on safety and asset management. Management attention should remain focused on the Auburn and Verbena capacity constraint, completion of open safety actions, pending equipment repairs, and restoration of validated financial reporting. 691
City of Adelanto 4 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
2. Health & Safety
Monthly Safety Training
As part of the of operations for the City of Adelanto’s wastewater facilities staff receive routine safety training to ensure that they are working safely. This is accomplished through daily safety tailgate meetings, assigned monthly training topics, and topic specific safety stand downs periodically.
Staff has completed the following trainings this year as part of the company wide training program:
February 2026: Ergonomics
March 2026: Stand Down: Slips, Trips, and Falls
March 2026: Stand Down: Finger Injuries
March 2026: Vehicle Safety Training
April 2026: Machine Guarding
May 2026: Fall Protection Awareness
June 2026: Respiratory Protection
July 2026: Heat Stress Awareness
August 2026: Preventing Back Injury
SPARKS Program Overview
The Woodard & Curran SPARKS Program is a company-wide health and safety initiative that recognizes employees and teams who demonstrate a strong commitment to maintaining a safe and healthy workplace. The program promotes proactive safety leadership through completion of required safety training, participation in monthly safety meetings, fulfillment of annual health and safety requirements, and adherence to safe work practices that prevent OSHA-recordable incidents. By reinforcing daily hazard awareness, accountability, teamwork, and open communication regarding safety concerns, the SPARKS Program helps foster a culture of continuous improvement and operational excellence across all facilities.
The Adelanto team remains fully compliant with all SPARKS Program requirements, reflecting its ongoing commitment to employee safety, regulatory compliance, and reliable utility operations Startup Safety Audit
167 actions items were identified in the Startup Safety Audit and staff has already started to address the items. Many components to resolve the action items are on order and will arrive in the coming months to correct the identified issues.
To date 101 of the 167 identified action items have been resolved.
60.5% of the 167 action items have been completed to date. 692
City of Adelanto 5 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
3. Regulatory Compliance
During this reporting period, the City of Adelanto has maintained 100% regulatory compliance with all regulatory requirements. All required samples were collected and analyzed for required water quality constituents. Babcock Laboratories continues to be the preferred vendor for outside wastewater laboratory analysis. All process control analysis is performed in-house by Woodard & Curran staff, this analysis is crucial for making the adjustments at the facilities to ensure that treatment goals are achieved.
Table 3-1: Monthly Mean
Constituents Units 30-Day Mean Limit Measured Mean
Biochemical Oxygen Demand (BOD) mg/L 15 6.8
Methylene Blue Active Substances (MBAS) mg/L 1 0.17
Total Nitrogen (TN) mg/L 10 1.7
Table 3-2: Daily Maximum
Constituents Units Daily Limit Measured
Biochemical Oxygen Demand (BOD) mg/L Maximum 30 10
Methylene Blue Active Substances (MBAS) mg/L Maximum 2 0.17 Total Nitrogen (TN) mg/L NA 2.5
pH s.u. Between 6.0 to 9.0 7.15 – 7.47
Dissolved Oxygen (DO) mg/L Minimum 1 mg/L 1.74
693
City of Adelanto 6 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
4. WWTP Operations
Influent flow for the month of August totaled 105.245 MG with a peak flow of 3570 GPM on August 24, 2026.
All pH and electrical conductivity monitoring equipment was calibrated weekly, monthly, or as needed by plant staff based on the manufacturer’s recommendations and operational needs.
Operational highlights for the reporting period:
8/10/26: Mojave Desert AQMD inspected the generator and diesel-pump equipment and associated logs. The final inspection report was pending as of the report preparation date. Any findings or required follow-up will be documented upon receipt. 8/20/26: Staff witnessed an attempted break-in at the back gate to the facility. A police report was filed.
4.1 Flow & Loading
Table 4-1: Monthly Influent Information
Parameter Units Measured Value
Total Flow MG 105.245
Average Daily Flow MGD 3.395
Maximum Daily Flow MG 3.480
Minimum Daily Flow MG 3.260
Maximum Daily Peak Flow GPM 3570
Minimum Daily Peak Flow GPM 2854
Average BOD mg/L 208
Average Total Suspended Solids (TSS) mg/L 173
Average pH s.u. 7.03
Average Electrical Conductivity (EC) umho/cm 1102
Table 4-2: Monthly Effluent Information
Parameter Units Measured Value
Average BOD mg/L 6.8
Average TSS mg/L 2
Average Total Nitrogen mg/L 1.7
Average Total Dissolved Solids (TDS) mg/L 520
Average MBAs mg/L 0.17
Average DO mg/L 2.24
Average pH s.u. 7.32
Average Electrical Conductivity (EC) umho/cm 860
694
City of Adelanto 7 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
4.2 Bio-Solids Report
Table 4-3: Biosolids Hauled
Table 4-4: Residual Disposal
2026 Screenings/Grit Recycle
# of Bins Cubic Yards # of Bins
January 21 42 1
February 21 42 2
March 27 54 4
April 24 48 3
May 27 54 5
June 18 36 4
July 18 36 5
August 24 48 4
TOTAL 180 360 28
695
City of Adelanto 8 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
5. Collection System Management
A proactive sewer cleaning and inspection program represents one of the most cost-effective investments a utility can make. Regular maintenance helps prevent emergencies, protects public health and the environment, extends the life of existing infrastructure, and allows the City to address problems before they become costly capital or operational challenges. Through systematic cleaning, inspection, and asset condition assessment, the City can make better-informed infrastructure investment decisions while maintaining reliable wastewater service for the community.
Table 5-1: Sanitary Sewer Overflows
2026 Overflows Comments
January 0
February 0
March 0
April 0
May 0
June 0
July 0
August 0
TOTAL 0
Table 5-2: Collection System Maintenance
2026 Linear Feet Cleaned Linear Feet Inspected
January 0 0
February 0 0
March 7,775 0
April 1,320 0
May 7,702 480
June 16,123 11,169
July 18,367 8,912
August 9,005 15,300
TOTAL 60,292 35,861
Annual Cleaning Target
Clean Remaining
Annual Inspection Target
Clean Remaining
696
City of Adelanto 9 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
The City of Adelanto utilizes SmartCover® monitoring
technology as part of its proactive wastewater collection system management program. Smart Covers are installed on key sewer manholes and critical collection system locations to provide real-time monitoring of wastewater levels and system conditions. These devices continuously transmit data and generate alerts when sewer levels rise above predetermined thresholds, allowing operators to identify potential blockages, inflow and infiltration issues, or developing overflow conditions before they become sanitary sewer overflows (SSOs).
The system enhances operational awareness, supports regulatory compliance, improves emergency response times, and allows collection system staff to prioritize maintenance activities more efficiently.
SmartCover monitoring recorded no high-level alarms during August. At Auburn and Verbena, however, the reported maximum d/D reached 100%, indicating that the monitored pipe depth reached the pipe diameter during the reporting period. This condition warrants continued monitoring and technical evaluation.
697
City of Adelanto 10 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
698
City of Adelanto 11 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
6. Industrial Pretreatment Program
Woodard & Curran is in the process of reviewing the APUA Industrial Pretreatment Program and will develop a plan to modernize the program.
MK Magnetics is currently in the process of renewing their discharge permit with the APUA. 699
City of Adelanto 12 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
7. Maintenance & Repair
The City of Adelanto Wastewater Treatment Plant (WWTP) continues to execute a proactive maintenance and asset management program focused on improving system reliability, reducing emergency repairs, and maximizing the useful life of critical infrastructure. The Utility Cloud computerized maintenance management system (CMMS) has now been fully implemented and serves as the centralized platform for managing asset inventories, work orders, inspections, maintenance history, and equipment performance throughout the wastewater treatment plant and collection system.
Consistent with the asset management framework outlined in Woodard & Curran's operations proposal, the program supports preventative, predictive, and corrective maintenance activities while providing the data necessary for condition assessment, risk-based prioritization, lifecycle planning, and future capital improvement planning. Utility Cloud enables staff to systematically track maintenance activities, document asset condition, identify performance trends, and prioritize investments that improve reliability and reduce long-term operational costs.
The fully implemented system will continue to be refined and updated as additional asset information, maintenance procedures, and operational data are incorporated. These ongoing improvements will enhance maintenance planning, support data-driven decision-making, and strengthen the City's ability to effectively manage its wastewater infrastructure while maintaining regulatory compliance and reliable service to the community. Recent maintenance efforts have included routine preventive maintenance, equipment inspections, sewer system cleaning and inspection activities, and corrective repairs necessary to support uninterrupted plant and collection system operations.
Maintenance highlights for the reporting period:
8/5/26: Communication errors to the aeration blowers, biolac treatment system, and headworks area of the WWTP occurred. Staff was able to reset the communication network and return functionality.
8/5/26: The backflow prevention device at the facility was repaired. 8/7/26: Sensor lens caps were replaced on the north biolac basin dissolved oxygen sensor. 8/13/26: Troubleshooting of accuracy concerns with the sludge depth sensors in the final clarifiers is ongoing. The manufacturer and original installer are being consulted. 8/19/26: RAS pump #1 failed due to a seal leak. It will be evaluated during scheduled annual service in September. RAS pump #2 is currently in service in place of this pump. The facility has 3 RAS pumps in total with 2 in operation at a time.
8/31/26: Woodard & Curran Technician visited to reprogram the VFD for the primary Centrysis centrifuge that is used to dewater solids at the facility. The VFD had a memory issue and programming for the system had been lost.
Table 7-1: Annual Maintenance History
2026 Preventative Corrective Inspection
February Program Implementation
March 124 15 2
April 104 2 1
700
City of Adelanto 13 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
May 92 34 13
June 97 10 46
July 122 32 4
August 89 0 58
TOTAL 628 93 124
701
City of Adelanto 14 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
8. Personnel
The City of Adelanto is supported by a dedicated team of seven (7) full-time on-site personnel. In addition, both the City and the on-site team are backed by a broad network of technical and administrative experts from Woodard & Curran.
Onsite Staff
Adam Ambrose – Project Manager
Dutch Hause - Lead WWTP Operator
James Strang – Operator 2
Scott Heller – Operator 1
Art Vega– Lead Collections Systems Operator
Armando Zamora – Collection Systems Operator 1
Edwin Cruz – Collection Systems Operator 1
Additional Support Staff
Chris McMahon – Area Manager
Dave Kitzmiller – Operations Leader-Western U.S.
Marc Thomas – National Operations Leader
Anthony Naccarato – Client Services Manager
Adam Shapiro – O&M Technology Implementation Specialist Steve Lindemann – O&M Health & Safety Manager
Kyle McKee – Health & Safety Specialist
Ken Davis – Asset Management Services Manager
702
City of Adelanto 15 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
9. Financial Overview
Budget tracking for Fiscal Year 2026-2027:
Woodard & Curran is currently undergoing a transition to a new Enterprise Resource Planning (ERP) system that will support financial management, project accounting, invoicing, procurement, and reporting functions across the organization. As part of this implementation, financial data and reporting processes are being migrated, validated, and reconciled within the new system environment.
Due to the ongoing ERP transition, updated financial information is not currently available for inclusion in this month's report. Financial records remain under review as system data is reconciled and reporting functionality is finalized. As a result, comprehensive financial reporting, including budget-to-actual comparisons, expenditure summaries, and other financial metrics, cannot be provided at this time.
Operational and project activities continue to be performed in accordance with contract requirements; however, financial information will remain unavailable until the ERP transition and associated reconciliation efforts have been completed. Woodard & Curran's finance and implementation teams continue to work through the remaining transition activities to ensure the accuracy and integrity of financial data before it is released for reporting purposes.
Financial reporting will resume once validated information becomes available through the new ERP system.
The prior period budget tracker is presented below pending full reconciliation through the new ERP system.
703
City of Adelanto 16 Woodard & Curran, Inc.
Adelanto Wastewater MOR 2026-08 August 2026
Table 9-1 – Chemical Costs
Chemical Monthly Order Monthly Cost Fiscal YTD Cost
Polymer 2 totes (550 gallons) $8872.12 $8872.12
Table 9-2 – Monthly Power Consumption
KWH Consumption SCE Solar
January 2026 992 205
February 2026 850 238
March 2026 816 309
April 2026 720 342
May 2026 719 360
June 2026 679 403
July 2026 737 307
August 2026 755 352
Table 9-3 – Bio-solids Costs
Hauling / Tipping Fee Monthly Cost Fiscal YTD Cost
GIC (Hauling) $2,680.72 $7,125.67
Synagro (Tipping Fee) $5,830.35 $15,191.21
TOTAL COMBINED $8,511.06 $22,316.88
704
Maintenance History Report
Work Orders by Type Total
Preventative Maintenance 89
Inspections 58
Total 147
Report Start: 8/1/2026
Report End: 8/31/2026
Adelanto, CA Wastewater
Top Work Orders by Description
705
Date Asset Name Work Order Description Staff Work Type Status Inspections
CCTV
8/3/2026 Gravity Main ADEL-SGM-2163 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/4/2026 Gravity Main ADEL-SGM-2392 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/3/2026 Gravity Main ADEL-SGM-2393 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/3/2026 Gravity Main ADEL-SGM-2194 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/4/2026 Gravity Main ADEL-SGM-2195 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/4/2026 Gravity Main ADEL-SGM-2370 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/4/2026 Gravity Main ADEL-SGM-2399 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/4/2026 Gravity Main ADEL-SGM-2400 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/4/2026 Gravity Main ADEL-SGM-2371 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/4/2026 Gravity Main ADEL-SGM-2372 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/6/2026 Gravity Main ADEL-SGM-2373 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/5/2026 Gravity Main ADEL-SGM-2376 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/5/2026 Gravity Main ADEL-SGM-2375 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/5/2026 Gravity Main ADEL-SGM-2374 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/6/2026 Gravity Main ADEL-SGM-2078 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/6/2026 Gravity Main ADEL-SGM-2198 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/6/2026 Gravity Main ADEL-SGM-2082 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/6/2026 Gravity Main ADEL-SGM-2087 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/6/2026 Gravity Main ADEL-SGM-2179 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2181 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2182 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2180 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2178 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2177 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2176 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2175 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/10/2026 Gravity Main ADEL-SGM-2171 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 706
Date Asset Name Work Order Description Staff Work Type Status 8/12/2026 Gravity Main ADEL-SGM-2170 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/12/2026 Gravity Main ADEL-SGM-2174 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/12/2026 Gravity Main ADEL-SGM-2398 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/12/2026 Gravity Main ADEL-SGM-2402 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/12/2026 Gravity Main ADEL-SGM-2403 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/12/2026 Gravity Main ADEL-SGM-2173 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/13/2026 Gravity Main ADEL-SGM-2401 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/13/2026 Gravity Main ADEL-SGM-2377 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/13/2026 Gravity Main ADEL-SGM-2406 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/13/2026 Gravity Main ADEL-SGM-2405 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/17/2026 Gravity Main ADEL-SGM-2172 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/17/2026 Gravity Main ADEL-SGM-2164 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/20/2026 Gravity Main ADEL-SGM-2467 3 Year Gravity Main CCTV Art Vega Inspections Complete 8/20/2026 Gravity Main ADEL-SGM-2466 3 Year Gravity Main CCTV Art Vega Inspections Complete 8/20/2026 Gravity Main ADEL-SGM-2465 3 Year Gravity Main CCTV Art Vega Inspections Complete 8/20/2026 Gravity Main ADEL-SGM-2468 3 Year Gravity Main CCTV Art Vega Inspections Complete 8/26/2026 Gravity Main ADEL-SGM-2162 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/26/2026 Gravity Main ADEL-SGM-2165 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/26/2026 Gravity Main ADEL-SGM-2166 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/27/2026 Gravity Main ADEL-SGM-2192 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/27/2026 Gravity Main ADEL-SGM-2193 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/31/2026 Gravity Main ADEL-SGM-659 3 Year Gravity Main CCTV Armando Zamora Inspections Complete 8/31/2026 Gravity Main ADEL-SGM-658 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/31/2026 Gravity Main ADEL-SGM-656 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/31/2026 Gravity Main ADEL-SGM-657 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/31/2026 Gravity Main ADEL-SGM-655 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/31/2026 Gravity Main ADEL-SGM-654 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/31/2026 Gravity Main ADEL-SGM-648 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/27/2026 Gravity Main ADEL-SGM-2404 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 707
Date Asset Name Work Order Description Staff Work Type Status 8/27/2026 Gravity Main ADEL-SGM-2407 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete 8/27/2026 Gravity Main ADEL-SGM-2203 3 Year Gravity Main CCTV Edwin Cruz Inspections Complete Inspections Total: 58
Preventative Maintenance
Biolac System PM - Monthly
8/18/2026 WW North AB Aeration Header
Manifold Piping
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4111
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Closed
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4110
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4109
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4108
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4107
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Closed
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4105
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4104
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4103
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4102
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4101
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Aeration Header
Manifold
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4108
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4107
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
708
Date Asset Name Work Order Description Staff Work Type Status 8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4106
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4105
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4104
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4103
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4102
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4101
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4111
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4110
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW South AB Discharge Piping &
Diffusers MV-4109
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
8/18/2026 WW North AB Discharge Piping &
Diffusers MV-4106
Monthly Biolac System PM Scott Heller Preventative
Maintenance
Complete
Blower Compressor Inspection - Monthly
8/10/2026 WW Blower #1 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW Blower #2 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW Blower #3 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW Blower #4 Compressor Monthly Blower Compressor Inspection Scott Heller Preventative Maintenance
Complete
Compactor Inspection - Weekly
8/10/2026 WW West Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW East Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
709
Date Asset Name Work Order Description Staff Work Type Status 8/18/2026 WW East Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
8/18/2026 WW West Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
8/25/2026 WW East Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
8/25/2026 WW West Screen Compactor Weekly Compactor Inspection Scott Heller Preventative Maintenance
Complete
Corrective Work Order
8/25/2026 LS1 Wet Well Structure grease mat cleaning Armando Zamora Preventative Maintenance
Complete
DO Sensor PM - Quarterly
8/18/2026 WW North AB DO Probe Quarterly DO Sensor PM Scott Heller Preventative Maintenance
Complete
Line Cleaning
8/4/2026 Gravity Main ADEL-SGM-2372 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/11/2026 Gravity Main ADEL-SGM-2402 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
8/11/2026 Gravity Main ADEL-SGM-2403 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
8/11/2026 Gravity Main ADEL-SGM-2398 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
8/11/2026 Gravity Main ADEL-SGM-2405 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
8/11/2026 Gravity Main ADEL-SGM-2406 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
8/11/2026 Gravity Main ADEL-SGM-2401 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
8/11/2026 Gravity Main ADEL-SGM-2377 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/20/2026 Gravity Main ADEL-SGM-2467 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
710
Date Asset Name Work Order Description Staff Work Type Status 8/20/2026 Gravity Main ADEL-SGM-2466 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
8/20/2026 Gravity Main ADEL-SGM-2465 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
8/20/2026 Gravity Main ADEL-SGM-2468 3 Year Gravity Main Cleaning Art Vega Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2404 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2408 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2409 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2407 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2411 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2410 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2203 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2199 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2200 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2202 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2201 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2192 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2193 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
8/24/2026 Gravity Main ADEL-SGM-2081 3 Year Gravity Main Cleaning Edwin Cruz Preventative Maintenance
Complete
711
Date Asset Name Work Order Description Staff Work Type Status 8/25/2026 Gravity Main ADEL-SGM-438 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-438 monthly grease cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-439 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-375 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-381 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-373 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-374 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-575 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-397 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-576 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
8/25/2026 Gravity Main ADEL-SGM-577 3 Year Gravity Main Cleaning Armando Zamora Preventative Maintenance
Complete
Monthly Emergency Light Test
8/10/2026 WW MCC Room Exit Sign Monthly Emergency Light Test Scott Heller Preventative Maintenance
Complete
Polymer Skid Inspection - Monthly
8/10/2026 WW Polymer Skid 1 Monthly Polymer Skid Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW Polymer Skid 2 Monthly Polymer Skid Inspection Scott Heller Preventative Maintenance
Complete
Vehicle Inspection
8/31/2026 WW Vactor Monthly Vehicle Inspection Adam Ambrose Preventative Maintenance
Complete
712
Date Asset Name Work Order Description Staff Work Type Status Weekly Safety Shower & Eyewash Station Inspection
8/10/2026 WW Lab Safety Shower Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW Chemical Building Emergency
Eye Wash Station
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW Centrifuge Eyewash Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/10/2026 WW Safety Shower at Abandoned
Chlorine Tanks
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/18/2026 WW Chemical Building Emergency
Eye Wash Station
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/18/2026 WW Centrifuge Eyewash Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/18/2026 WW Lab Safety Shower Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/18/2026 WW Safety Shower at Abandoned
Chlorine Tanks
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/25/2026 WW Chemical Building Emergency
Eye Wash Station
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/25/2026 WW Centrifuge Eyewash Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/25/2026 WW Safety Shower at Abandoned
Chlorine Tanks
Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
8/25/2026 WW Lab Safety Shower Weekly Safety Shower & Eyewash Station Inspection Scott Heller Preventative Maintenance
Complete
Preventative Maintenance Total: 89
Report Total: 147
713
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT August 2026
Date: 9/15/2026
California Regional Water Quality Control Board
Lahontan Region
2501 Lake Tahoe Boulevard
South Lake Tahoe, CA 96150
Facility Name: Adelanto Domestic Wastewater Treatment Facility Address: 19101 Jonathan St.
Adelanto, CA 92301
Contact Person: Chris McMahon
Job Title: Area Manager
Phone: 620-474-7310
Email: [email protected]
WDR/NPDES Order Number: WDR100026851
WDID Number: 6B369805001
Type of Report: Monthly Quarterly Semi-Annual Annual Other Month(s): JAN FEB MAR APR MAY JUN
JUL AUG SEP OCT NOV DEC
*annual reports (circle first month of the reporting period) Year: 2026
Violations?: X NO YES*
*If YES is marked compelte a-g (Attach Additional information as necessary) I cerfity under penalty of law that this document and all attachments were prepared under my direction or supervison following a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my knowledge of the person(s) who manage the system, or those directly responsible for data gathering, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifcant penalties for submitting false information, including the possiblity of fine and imprisonment.
If you have any questions or require additional information, please contact Chris McMahon at the number provided above.
Signature:
Name: Chris McMahon
Title: Area Manager
714
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT August 2026
Operational Problems and Maintenance Activities Affecting Effluent Discharges or Compliance:
No issues to report.
Corrective Actions (as needed):
Not applicable
Corrective Actions Schedule (as needed):
Not applicable
715
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT August 2026
Inf Flow Inst. Peak Flow Eff. Q Ponds Pond #1Pond #2 & #3Pond #4 Pond #5 Pond #9 Basin N Basin S MGD GPM MGD Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft Freeboard Ft 8/1/2026 3.3549 2938.159 3.3549 20.75 EMPTY 16.00 14.00 16.00 2.43 2.63 8/2/2026 3.2637 3156.506 3.2637 18.50 EMPTY 16.00 16.00 16.00 2.68 2.45 8/3/2026 3.3299 3301.535 3.3299 17.00 EMPTY 16.00 16.00 16.00 2.75 2.56 8/4/2026 3.3845 3380.843 3.3845 16.50 EMPTY 16.00 16.00 16.00 2.66 2.48 8/5/2026 3.4244 3467.119 3.4244 15.00 EMPTY 16.00 16.00 16.00 2.47 2.26 8/6/2026 3.4048 3392.528 3.4048 14.50 EMPTY 16.00 16.00 16.00 2.68 2.55 8/7/2026 3.3995 3132.684 3.3995 17.00 EMPTY 16.00 16.00 16.00 2.69 2.65 8/8/2026 3.2597 2955.677 3.2597 19.00 EMPTY 16.00 16.00 16.00 2.91 2.70 8/9/2026 3.3988 3416.325 3.3988 20.25 EMPTY 16.00 16.00 15.50 2.94 2.72 8/10/2026 3.4598 3493.047 3.4598 21.50 EMPTY 16.00 16.00 13.75 3.34 2.94 8/11/2026 3.4413 3468.744 3.4413 22.25 EMPTY 16.00 16.00 13.50 3.30 2.91 8/12/2026 3.4454 3495.418 3.4454 23.00 EMPTY 16.00 16.00 16.00 2.99 2.64 8/13/2026 3.4545 3459.825 3.4545 24.00 EMPTY 15.25 16.00 16.00 2.94 2.66 8/14/2026 3.4236 3175.621 3.4236 23.50 EMPTY 16.00 16.00 16.00 2.73 2.55 8/15/2026 3.3503 2963.088 3.3503 20.25 EMPTY 16.00 16.00 16.00 2.55 2.33 8/16/2026 3.4220 3502.351 3.4220 18.00 EMPTY 16.00 16.00 16.00 2.40 2.48 8/17/2026 3.4021 3504.274 3.4021 20.00 EMPTY 15.50 16.00 16.00 2.73 2.55 8/18/2026 3.3948 3427.172 3.3948 20.75 EMPTY 14.50 16.00 16.00 3.16 2.73 8/19/2026 3.3831 3418.806 3.3831 21.25 EMPTY 14.00 16.00 16.00 2.42 2.24 8/20/2026 3.4256 3424.748 3.4256 22.00 EMPTY 13.50 16.00 16.00 2.44 2.26 8/21/2026 3.3735 3060.247 3.3735 18.25 EMPTY 15.75 16.00 16.00 2.24 2.48 8/22/2026 3.3541 2854.264 3.3541 18.75 EMPTY 14.75 16.00 16.00 3.17 2.87 8/23/2026 3.4383 3489.426 3.4383 20.00 EMPTY 14.00 16.00 16.00 2.68 2.47 8/24/2026 3.4797 3570.39 3.4797 20.75 EMPTY 13.75 16.00 16.00 2.40 2.22 8/25/2026 3.4454 3458.777 3.4454 21.50 EMPTY 13.00 16.00 16.00 2.44 2.24 8/26/2026 3.4421 3444.232 3.4421 21.75 EMPTY 12.75 16.00 16.00 2.91 2.73 8/27/2026 3.3787 3314.091 3.3787 22.25 EMPTY 12.50 16.00 16.00 2.94 2.69 8/28/2026 3.3452 2991.28 3.3452 22.75 EMPTY 12.25 16.00 16.00 3.16 2.84 8/29/2026 3.3639 2913.909 3.3639 18.75 EMPTY 14.50 16.00 16.00 3.16 2.9 8/30/2026 3.3948 3508.334 3.3948 16.50 EMPTY 16.00 16.00 16.00 3.27 3.02 8/31/2026 3.4068 3512.294 3.4068 15.25 EMPTY 16.00 16.00 16.00 2.84 2.65 Total 105.245 105.245
Average 3.395 3309.410 3.395 19.726 EMPTY 15.097 15.935 15.831 2.788 2.594 Maximum 3.480 3570.390 3.480 24.000 0.000 16.000 16.000 16.000 3.340 3.020 Minimum 3.260 2854.264 3.260 14.500 0.000 12.250 14.000 13.500 2.240 2.220 Date
Flow Data Percolation Ponds Biolac Basins
716
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT August 2026
BOD5 TSS pH D.O. EC TN TDS MBAS BOD5 TSS pH EC
mg/L mg/L su mg/L umho/cm mg/L mg/L mg/L mg/L mg/L su umho/cm 8/1/2026
8/2/2026
8/3/2026
8/4/2026
8/5/2026 10 3 7.22 2.24 928 2.5 520 <0.08 250 160 7.02 760 8/6/2026
8/7/2026
8/8/2026
8/9/2026
8/10/2026
8/11/2026
8/12/2026 <2.5 1 7.15 2.03 824 1.4 190 140 6.84 891
8/13/2026
8/14/2026
8/15/2026
8/16/2026
8/17/2026
8/18/2026
8/19/2026 3.5 2 7.44 1.97 831 1.2 520 0.17 190 190 7.37 1433 8/20/2026
8/21/2026
8/22/2026
8/23/2026
8/24/2026
8/25/2026
8/26/2026 <2.5 2 7.47 1.74 858 1.8 200 200 6.9 1324
8/27/2026
8/28/2026
8/29/2026
8/30/2026
8/31/2026
Total
Average 6.75 2.00 7.32 1.995 860 1.7 520 0.17 207.5 172.5 7.03 1102 Maximum 10.00 3.00 7.47 2.240 928 2.5 520 0.17 250.0 200.0 7.37 1433 Minimum 3.50 1.00 7.15 1.740 824 1.2 520 0.17 190.0 140.0 6.84 760 Date
Effluent Weekly Influent
717
Managed by: Woodard Curran ADELANTO WWTP SUMMARY REPORT August 2026
TN D.O. EC Temp TN D.O. EC Temp TN D.O. EC Temp
mg/L mg/L umho/cm C mg/L mg/L umho/cm C mg/L mg/L umho/cm C 8/1/2026
8/2/2026
8/3/2026
8/4/2026
8/5/2026
8/6/2026
8/7/2026
8/8/2026
8/9/2026
8/10/2026
8/11/2026
8/12/2026
8/13/2026
8/14/2026
8/15/2026
8/16/2026
8/17/2026
8/18/2026
8/19/2026
8/20/2026
8/21/2026
8/22/2026
8/23/2026
8/24/2026
8/25/2026
8/26/2026
8/27/2026
8/28/2026
8/29/2026
8/30/2026
Total
Average 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Maximum 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Minimum 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Date
Pond Monitoring #1 Annually Pond Monitoring #5 Annually Pond Monitoring #9 Annually 718
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon
St.
Project Name:
Analytical Report: Page 1 of 5
Project Number:
Address:
Contact:
Adelanto, CA 92301
Dutch Hause
P.O. Box 506
Client Name: Woodard & Curran
Report Date: 19-Aug-2026 Work Order Number:
Received on Ice (Y/N): Yes Temp: 5 °C
C6H0500
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Lab Sample # Client Sample ID Matrix Date Sampled
Sample Identification
By Date Submitted By
C6H0500-01 Liquid 08/05/26 07:30 Scot Heller 08/05/26 12:10 Courier (Guillermo) -DE
Influent Composite
C6H0500-02 Liquid 08/05/26 06:45 Scot Heller 08/05/26 12:10 Courier (Guillermo) -DE
Effluent Composite
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
Babcock Laboratories, Inc. - Riverside
6100 Quail Valley Court
Riverside, CA 92507-0704
719
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon
St.
Project Name:
Analytical Report: Page 2 of 5
Project Number:
Address:
Contact:
Adelanto, CA 92301
Dutch Hause
P.O. Box 506
Client Name: Woodard & Curran
Report Date: 19-Aug-2026 Work Order Number:
Received on Ice (Y/N): Yes Temp: 5 °C
C6H0500
Laboratory Reference Number
Sample Description
08/05/26 07:30
Sampled Date/Time Received Date/Time
08/05/26 12:10
Matrix
Influent Liquid
C6H0500-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Testing performed by: Babcock Laboratories, Inc. - Riverside CA ELAP No. 2698, EPA No. CA00102, NELAP No. OR4035
Solids
Total Dissolved Solids 560 20 mg/L SM 2540C 08/09/26 16:18 VMV Total Suspended Solids 160 10 mg/L SM 2540D 08/10/26 12:00 PBS Aggregate Organic Compounds
Biochemical Oxygen Demand 250 50 mg/L SM 5210B 08/05/26 21:15 CXR N-BOD1 Nutrients
Ammonia-Nitrogen 30 5.0 3.2 mg/L SM 4500NH3 G 08/07/26 09:32 GMB Kjeldahl Nitrogen 43 5.0 mg/L EPA 351.2 08/12/26 19:23 JXM mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
Babcock Laboratories, Inc. - Riverside
6100 Quail Valley Court
Riverside, CA 92507-0704
720
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon
St.
Project Name:
Analytical Report: Page 3 of 5
Project Number:
Address:
Contact:
Adelanto, CA 92301
Dutch Hause
P.O. Box 506
Client Name: Woodard & Curran
Report Date: 19-Aug-2026 Work Order Number:
Received on Ice (Y/N): Yes Temp: 5 °C
C6H0500
Laboratory Reference Number
Sample Description
08/05/26 06:45
Sampled Date/Time Received Date/Time
08/05/26 12:10
Matrix
Effluent Liquid
C6H0500-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Testing performed by: Babcock Laboratories, Inc. - Riverside CA ELAP No. 2698, EPA No. CA00102, NELAP No. OR4035
Anions
Nitrate as N 1.1 0.20 mg/L EPA 300.0 08/06/26 19:58 GMB Nitrite as N ND 0.1 mg/L EPA 300.0 08/06/26 19:58 GMB
Solids
Total Dissolved Solids 520 10 mg/L SM 2540C 08/09/26 16:18 VMV Total Suspended Solids 3 0.5 mg/L SM 2540D 08/10/26 12:00 PBS Aggregate Organic Compounds
Biochemical Oxygen Demand 10 5.0 mg/L SM 5210B 08/05/26 21:18 CXR N-BOD1 Surfactants
MBAS ND 0.08 mg/L SM 5540C 08/06/26 17:38 SXA
Nutrients
Ammonia-Nitrogen 0.3 0.1 0.06 mg/L SM 4500NH3 G 08/07/26 09:33 GMB Kjeldahl Nitrogen 1.4 0.1 mg/L EPA 351.2 08/12/26 16:58 JXM Total Nitrogen 2.5 0.40 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
Babcock Laboratories, Inc. - Riverside
6100 Quail Valley Court
Riverside, CA 92507-0704
721
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon
St.
Project Name:
Analytical Report: Page 4 of 5
Project Number:
Address:
Contact:
Adelanto, CA 92301
Dutch Hause
P.O. Box 506
Client Name: Woodard & Curran
Report Date: 19-Aug-2026 Work Order Number:
Received on Ice (Y/N): Yes Temp: 5 °C
C6H0500
Notes and Definitions
N-BOD1 Dilution water blank exceeds 0.20 mg/L. As per method, data is reportable as qualified.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / ''' NELAP does not offer accreditation for this analyte/method/matrix combination e-Short_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
Babcock Laboratories, Inc. - Riverside
6100 Quail Valley Court
Riverside, CA 92507-0704
722
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon
St.
Project Name:
Analytical Report: Page 5 of 5
Project Number:
Address:
Contact:
Adelanto, CA 92301
Dutch Hause
P.O. Box 506
Client Name: Woodard & Curran
Report Date: 19-Aug-2026 Work Order Number:
Received on Ice (Y/N): Yes Temp: 5 °C
C6H0500
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
Babcock Laboratories, Inc. - Riverside
6100 Quail Valley Court
Riverside, CA 92507-0704
723
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6H1418-01 Liquid 08/12/26 7:30 Scott Heller Courier
(Monica)-DE
Influent Composite 08/12/26 12:05
C6H1418-02 Liquid 08/12/26 6:50 Scott Heller Courier
(Monica)-DE
Effluent Composite 08/12/26 12:05
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
724
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Laboratory Reference Number
Sample Description
08/12/26 07:30
Sampled Date/Time Received Date/Time
08/12/26 12:05
Matrix
Influent Liquid
C6H1418-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Suspended Solids 140 10 10 mg/L SM 2540D 08/18/26 19:30 BXR Aggregate Organic Compounds
Biochemical Oxygen Demand 190 50 50 mg/L SM 5210B 08/12/26 23:02 CXR N-BOD1 Nutrients
Ammonia-Nitrogen 30 5.0 3.2 mg/L SM 4500NH3 G 08/19/26 11:14 GMB Kjeldahl Nitrogen 42 2.5 1.8 mg/L EPA 351.2 08/24/26 22:29 BXR mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
725
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Laboratory Reference Number
Sample Description
08/12/26 06:50
Sampled Date/Time Received Date/Time
08/12/26 12:05
Matrix
Effluent Liquid
C6H1418-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.26 0.20 0.12 mg/L EPA 300.0 08/13/26 03:34 JXM Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 08/13/26 03:34 JXM Solids
Total Suspended Solids 1 0.5 0.5 mg/L SM 2540D 08/18/26 19:30 BXR Aggregate Organic Compounds
Biochemical Oxygen Demand ND 2.5 2.5 mg/L SM 5210B 08/12/26 23:05 CXR N-BOD1 Nutrients
Ammonia-Nitrogen 0.3 0.1 0.06 mg/L SM 4500NH3 G 08/19/26 11:15 GMB Kjeldahl Nitrogen 1.1 0.1 0.07 mg/L EPA 351.2 08/24/26 22:30 BXR Total Nitrogen 1.4 0.40 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
726
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6H12160 - Analyzed as Received IC
Blank (6H12160-BLK1) Prepared & Analyzed: 08/12/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6H12160-BS1) Prepared & Analyzed: 08/12/26
Nitrite as N 2.40 0.1 0.05 mg/L 2.50 96 90-110
Nitrate as N 5.39 0.20 0.12 mg/L 5.65 95 90-110
Matrix Spike (6H12160-MS1) Source: C6H1520-06 Prepared & Analyzed: 08/13/26 Nitrite as N 2.82 0.1 0.05 mg/L 2.50 0.238 103 80-120
Nitrate as N 13.2 0.20 0.12 mg/L 5.65 7.21 106 75-131
Matrix Spike (6H12160-MS2) Source: C6H1180-03RE1 Prepared & Analyzed: 08/13/26 Nitrite as N 54.4 0.5 0.3 mg/L 12.5 39.8 118 80-120
Nitrate as N 28.5 1.0 0.62 mg/L 28.2 0.661 98 75-131
Matrix Spike Dup (6H12160-MSD1) Source: C6H1520-06 Prepared & Analyzed: 08/13/26 Nitrite as N 2.78 0.1 0.05 mg/L 2.50 0.238 102 80-120 1 20 Nitrate as N 13.2 0.20 0.12 mg/L 5.65 7.21 106 75-131 0.04 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
727
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6H18229 - Analyzed as received
Blank (6H18229-BLK1) Prepared & Analyzed: 08/18/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6H18229-BS1) Prepared & Analyzed: 08/18/26
Total Suspended Solids 548 5 5 mg/L 500 110 90-110
Duplicate (6H18229-DUP1) Source: C6H1377-01 Prepared & Analyzed: 08/18/26 Total Suspended Solids 200 10 10 mg/L 232 15 25
Duplicate (6H18229-DUP2) Source: C6H1388-01 Prepared & Analyzed: 08/18/26 Total Suspended Solids 190 10 10 mg/L 170 11 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
728
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6H12151 - Analyzed as received
Blank (6H12151-BLK1) Prepared & Analyzed: 08/12/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6H12151-BS1) Prepared & Analyzed: 08/12/26
Biochemical Oxygen
Demand
183 50 50 mg/L 198 92 85-115
Duplicate (6H12151-DUP1) Source: C6H1401-07 Prepared & Analyzed: 08/12/26 Biochemical Oxygen
Demand
ND 10 10 mg/L ND 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
729
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6H19093 - Analyzed as received
Blank (6H19093-BLK1) Prepared & Analyzed: 08/19/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6H19093-BS1) Prepared & Analyzed: 08/19/26
Ammonia-Nitrogen 0.985 0.1 0.06 mg/L 1.00 98 90-110
Matrix Spike (6H19093-MS1) Source: C6H1494-02 Prepared & Analyzed: 08/19/26 Ammonia-Nitrogen 1.78 0.1 0.06 mg/L 1.00 0.867 92 80-120 Matrix Spike Dup (6H19093-MSD1) Source: C6H1494-02 Prepared & Analyzed: 08/19/26 Ammonia-Nitrogen 1.77 0.1 0.06 mg/L 1.00 0.867 90 80-120 0.7 20 Batch 6H20020 - Acid Digest
Blank (6H20020-BLK1) Prepared & Analyzed: 08/24/26
Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6H20020-BS1) Prepared & Analyzed: 08/24/26
Kjeldahl Nitrogen 0.892 0.1 0.07 mg/L 1.00 89 80-120
Duplicate (6H20020-DUP1) Source: C6H2181-01 Prepared & Analyzed: 08/24/26 Kjeldahl Nitrogen 7.46 1.2 5.58 25 QFinP,
QRPDo
0.9 mg/L 29
Matrix Spike (6H20020-MS1) Source: C6H2181-01 Prepared & Analyzed: 08/24/26 Kjeldahl Nitrogen 7.63 1.2 0.9 mg/L 2.50 5.58 82 42-154 Matrix Spike Dup (6H20020-MSD1) Source: C6H2181-01 Prepared & Analyzed: 08/24/26 Kjeldahl Nitrogen 7.72 1.2 0.9 mg/L 2.50 5.58 86 42-154 1 25 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
730
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
Notes and Definitions
J Estimated value
N-BOD1 Dilution water blank exceeds 0.20 mg/L. As per method, data is reportable as qualified.
QFinP Follow-up in progress.
QRPDo The RPD value for the sample duplicate or MS/MSD did not meet laboratory acceptance criteria.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
731
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 9
Project Name:
31-Aug-2026
Work Order Number: C6H1418
Received on Ice (Y/N): Yes Temp: 2 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H1418
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
732
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6H2199-01 Liquid 08/19/26 7:00 Scot Heller Courier
(Guillermo)-DE
Influent Composite 08/19/26 11:39
C6H2199-02 Liquid 08/19/26 6:30 Scot Heller Courier
(Guillermo)-DE
Effluent Composite 08/19/26 11:39
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
733
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Laboratory Reference Number
Sample Description
08/19/26 07:00
Sampled Date/Time Received Date/Time
08/19/26 11:39
Matrix
Influent Liquid
C6H2199-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Dissolved Solids 570 10 10 mg/L SM 2540C 08/21/26 13:55 CMR Total Suspended Solids 190 10 10 mg/L SM 2540D 08/25/26 14:45 RUB Aggregate Organic Compounds
Biochemical Oxygen Demand 190 50 50 mg/L SM 5210B 08/19/26 23:20 CXR Nutrients
Ammonia-Nitrogen 33 5.0 3.2 mg/L SM 4500NH3 G 08/21/26 12:10 RUB Kjeldahl Nitrogen 42 2.5 1.8 mg/L EPA 351.2 08/26/26 17:13 JXM mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
734
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Laboratory Reference Number
Sample Description
08/19/26 06:30
Sampled Date/Time Received Date/Time
08/19/26 11:39
Matrix
Effluent Liquid
C6H2199-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.13 0.20 0.12 mg/L EPA 300.0 08/19/26 23:37 GMB J Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 08/19/26 23:37 GMB Solids
Total Dissolved Solids 520 10 10 mg/L SM 2540C 08/21/26 13:55 CMR Total Suspended Solids 2 0.6 0.6 mg/L SM 2540D 08/25/26 14:45 RUB N-TSS Aggregate Organic Compounds
Biochemical Oxygen Demand 3.5 2.5 2.5 mg/L SM 5210B 08/19/26 23:20 CXR Surfactants
MBAS 0.17 0.08 0.02 mg/L SM 5540C 08/20/26 22:19 SXA
Nutrients
Ammonia-Nitrogen 0.3 0.1 0.06 mg/L SM 4500NH3 G 08/21/26 12:11 RUB Kjeldahl Nitrogen 1.1 0.1 0.07 mg/L EPA 351.2 08/26/26 17:14 JXM Total Nitrogen 1.2 0.40 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
735
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6H19129 - Analyzed as Received IC
Blank (6H19129-BLK1) Prepared & Analyzed: 08/19/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6H19129-BS1) Prepared & Analyzed: 08/19/26
Nitrite as N 2.36 0.1 0.05 mg/L 2.50 95 90-110
Nitrate as N 5.34 0.20 0.12 mg/L 5.65 94 90-110
Matrix Spike (6H19129-MS1) Source: C6H2315-01 Prepared & Analyzed: 08/20/26 Nitrite as N 2.35 0.1 0.05 mg/L 2.50 ND 94 80-120
Nitrate as N 10.5 0.20 0.12 mg/L 5.65 4.49 107 75-131
Matrix Spike (6H19129-MS2) Source: C6H2318-01 Prepared & Analyzed: 08/20/26 Nitrite as N 2.07 0.1 0.05 mg/L 2.50 ND 83 80-120
Nitrate as N 8.06 0.20 0.12 mg/L 5.65 2.13 105 75-131
Matrix Spike Dup (6H19129-MSD1) Source: C6H2315-01 Prepared & Analyzed: 08/20/26 Nitrite as N 2.40 0.1 0.05 mg/L 2.50 ND 96 80-120 2 20
Nitrate as N 10.6 0.20 0.12 mg/L 5.65 4.49 109 75-131 0.9 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
736
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6H21015 - Analyzed as received
Blank (6H21015-BLK1) Prepared & Analyzed: 08/21/26
Total Dissolved Solids ND 10 10 mg/L
LCS (6H21015-BS1) Prepared & Analyzed: 08/21/26
Total Dissolved Solids 742 10 10 mg/L 746 99 90-110
Duplicate (6H21015-DUP1) Source: C6H2115-01 Prepared & Analyzed: 08/21/26 Total Dissolved Solids 611 10 10 mg/L 602 1 20
Duplicate (6H21015-DUP2) Source: C6H2116-01 Prepared & Analyzed: 08/21/26 Total Dissolved Solids 766 20 20 mg/L 778 2 20
Batch 6H25159 - Analyzed as received
Blank (6H25159-BLK1) Prepared & Analyzed: 08/25/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6H25159-BS1) Prepared & Analyzed: 08/25/26
Total Suspended Solids 495 5 5 mg/L 500 99 90-110
Duplicate (6H25159-DUP1) Source: C6H2193-01 Prepared & Analyzed: 08/25/26 Total Suspended Solids 292 10 10 mg/L 314 7 25
Duplicate (6H25159-DUP2) Source: C6H2199-01 Prepared & Analyzed: 08/25/26 Total Suspended Solids 184 10 10 mg/L 188 2 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
737
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6H19151 - Analyzed as received
Blank (6H19151-BLK1) Prepared & Analyzed: 08/19/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6H19151-BS1) Prepared & Analyzed: 08/19/26
Biochemical Oxygen
Demand
203 50 50 mg/L 198 102 85-115
Duplicate (6H19151-DUP1) Source: C6H2128-01 Prepared & Analyzed: 08/19/26 Biochemical Oxygen
Demand
397 50 50 mg/L 385 3 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
738
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Surfactants - Batch Quality Control
Batch 6H20071 - Solvent Extraction.
Blank (6H20071-BLK1) Prepared & Analyzed: 08/20/26
MBAS ND 0.08 0.02 mg/L
LCS (6H20071-BS1) Prepared & Analyzed: 08/20/26
MBAS 0.438 0.08 0.02 mg/L 0.400 110 90-110
Matrix Spike (6H20071-MS1) Source: C6H2405-01 Prepared & Analyzed: 08/20/26 MBAS 0.425 0.20 0.06 mg/L 0.500 ND 85 43-150
Matrix Spike Dup (6H20071-MSD1) Source: C6H2405-01 Prepared & Analyzed: 08/20/26 MBAS 0.508 0.20 0.06 mg/L 0.500 ND 102 43-150 18 30
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
739
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6H21009 - Analyzed as received
Blank (6H21009-BLK1) Prepared & Analyzed: 08/21/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6H21009-BS1) Prepared & Analyzed: 08/21/26
Ammonia-Nitrogen 1.05 0.1 0.06 mg/L 1.00 105 90-110
Matrix Spike (6H21009-MS1) Source: C6H1776-02 Prepared & Analyzed: 08/21/26 Ammonia-Nitrogen 2.48 0.5 0.3 mg/L 1.00 1.41 107 80-120 Matrix Spike Dup (6H21009-MSD1) Source: C6H1776-02 Prepared & Analyzed: 08/21/26 Ammonia-Nitrogen 2.53 0.5 0.3 mg/L 1.00 1.41 112 80-120 2 20 Batch 6H25128 - Acid Digest
Blank (6H25128-BLK1) Prepared: 08/25/26 Analyzed: 08/26/26 Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6H25128-BS1) Prepared: 08/25/26 Analyzed: 08/26/26 Kjeldahl Nitrogen 0.901 0.1 0.07 mg/L 1.00 90 80-120
Matrix Spike (6H25128-MS1) Source: C6H1946-01 Prepared: 08/25/26 Analyzed: 08/26/26 Kjeldahl Nitrogen 0.998 0.1 0.07 mg/L 1.00 ND 100 42-154 Matrix Spike Dup (6H25128-MSD1) Source: C6H1946-01 Prepared: 08/25/26 Analyzed: 08/26/26 Kjeldahl Nitrogen 0.952 0.1 0.07 mg/L 1.00 ND 95 42-154 5 25 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
740
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
Notes and Definitions
J Estimated value
N-TSS Initial residue before adjusting for dilution was less than 2.5mg. As per method, data is reported as qualified.
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
741
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 10 of 10
Project Name:
28-Aug-2026
Work Order Number: C6H2199
Received on Ice (Y/N): Yes Temp: 6 °C
Adelanto - Weekly/BiWeekly WW 2026
Adelanto WWTP - 19101 Jonathan St.
C6H2199
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
742
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 1 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s). Also, enclosed is a copy of the Chain of Custody document (if received with your sample(s)). Please note any unused portion of the sample(s) may be responsibly discarded after 30 days from the above report date, unless you have requested otherwise.
Thank you for the opportunity to serve your analytical needs. If you have any questions or concerns regarding this report please contact our client service department.
Sample Identification
Lab Sample # Client Sample ID Matrix Date Sampled By Date Submitted By C6H2950-01 Liquid 08/26/26 7:00 James Strang Courier
(Guillermo)-DE
Influent Composite 08/26/26 11:25
C6H2950-02 Liquid 08/26/26 6:43 James Strang Courier
(Guillermo)-DE
Effluent Composite 08/26/26 11:25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
743
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 2 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Laboratory Reference Number
Sample Description
08/26/26 07:00
Sampled Date/Time Received Date/Time
08/26/26 11:25
Matrix
Influent Liquid
C6H2950-01
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Solids
Total Suspended Solids 200 10 10 mg/L SM 2540D 09/01/26 14:57 RUB Aggregate Organic Compounds
Biochemical Oxygen Demand 200 50 50 mg/L SM 5210B 08/26/26 21:55 CXR Nutrients
Ammonia-Nitrogen 33 5.0 3.2 mg/L SM 4500NH3 G 08/28/26 09:41 RUB Kjeldahl Nitrogen 59 5.0 3.5 mg/L EPA 351.2 09/02/26 21:40 AAR mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
744
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 3 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Laboratory Reference Number
Sample Description
08/26/26 06:43
Sampled Date/Time Received Date/Time
08/26/26 11:25
Matrix
Effluent Liquid
C6H2950-02
Analyte(s) Result RDL MDL Units Method Analysis Date Analyst Flag Anions
Nitrate as N 0.20 0.20 0.12 mg/L EPA 300.0 08/27/26 09:46 JXM Nitrite as N ND 0.1 0.05 mg/L EPA 300.0 08/27/26 09:46 JXM Solids
Total Suspended Solids 2 0.5 0.5 mg/L SM 2540D 09/01/26 14:57 RUB Aggregate Organic Compounds
Biochemical Oxygen Demand ND 2.5 2.5 mg/L SM 5210B 08/26/26 21:57 CXR Nutrients
Ammonia-Nitrogen 0.5 0.1 0.06 mg/L SM 4500NH3 G 08/28/26 09:42 RUB Kjeldahl Nitrogen 1.6 0.1 0.07 mg/L EPA 351.2 09/02/26 19:05 AAR Total Nitrogen 1.8 0.40 mg/L Calculation
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
745
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 4 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Anions - Batch Quality Control
Batch 6H26111 - Analyzed as Received IC
Blank (6H26111-BLK1) Prepared & Analyzed: 08/27/26
Nitrite as N ND 0.1 0.05 mg/L
Nitrate as N ND 0.20 0.12 mg/L
LCS (6H26111-BS1) Prepared & Analyzed: 08/27/26
Nitrite as N 2.34 0.1 0.05 mg/L 2.50 93 90-110
Nitrate as N 5.24 0.20 0.12 mg/L 5.65 93 90-110
Duplicate (6H26111-DUP1) Source: C6H2918-08 Prepared & Analyzed: 08/26/26 Nitrite as N 0.860 0.2 0.1 mg/L 0.858 0.2 20
Nitrate as N 83.8 0.40 0.24 mg/L 83.8 0.003 20
Matrix Spike (6H26111-MS1) Source: C6H2919-01 Prepared & Analyzed: 08/27/26 Nitrite as N 2.22 0.1 0.05 mg/L 2.50 ND 89 80-120
Nitrate as N 5.46 0.20 0.12 mg/L 5.65 ND 97 75-131
Matrix Spike (6H26111-MS2) Source: C6H2918-08 Prepared & Analyzed: 08/26/26 Nitrite as N 6.04 0.2 0.1 mg/L 5.00 0.858 104 80-120
Nitrate as N 94.9 0.42 0.25 mg/L 11.3 83.8 98 75-131
Matrix Spike Dup (6H26111-MSD1) Source: C6H2919-01 Prepared & Analyzed: 08/27/26 Nitrite as N 2.28 0.1 0.05 mg/L 2.50 ND 91 80-120 2 20
Nitrate as N 5.56 0.20 0.12 mg/L 5.65 ND 98 75-131 2 20 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
746
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 5 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Solids - Batch Quality Control
Batch 6I01171 - Analyzed as received
Blank (6I01171-BLK1) Prepared & Analyzed: 09/01/26
Total Suspended Solids ND 0.5 0.5 mg/L
LCS (6I01171-BS1) Prepared & Analyzed: 09/01/26
Total Suspended Solids 507 5 5 mg/L 500 101 90-110
Duplicate (6I01171-DUP1) Source: C6H2946-01 Prepared & Analyzed: 09/01/26 Total Suspended Solids 102 5 5 mg/L 102 0 25
Duplicate (6I01171-DUP2) Source: C6H2949-01 Prepared & Analyzed: 09/01/26 Total Suspended Solids 206 10 10 mg/L 224 8 25
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
747
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 6 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Aggregate Organic Compounds - Batch Quality Control
Batch 6H26131 - Analyzed as received
Blank (6H26131-BLK1) Prepared & Analyzed: 08/26/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
Blank (6H26131-BLK2) Prepared & Analyzed: 08/26/26
Biochemical Oxygen
Demand
ND 1.0 1.0 mg/L
LCS (6H26131-BS1) Prepared & Analyzed: 08/26/26
Biochemical Oxygen
Demand
204 50 50 mg/L 198 103 85-115
Duplicate (6H26131-DUP1) Source: C6H2901-01 Prepared & Analyzed: 08/26/26 Biochemical Oxygen
Demand
250 50 50 mg/L 302 19 20
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
748
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 7 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Result RDL Units Level
Spike
Result
Source
%REC
%REC
Limits RPD
RPD
Analyte(s) Limit Flag
Nutrients - Batch Quality Control
Batch 6H28072 - Analyzed as received
Blank (6H28072-BLK1) Prepared & Analyzed: 08/28/26
Ammonia-Nitrogen ND 0.1 0.06 mg/L
LCS (6H28072-BS1) Prepared & Analyzed: 08/28/26
Ammonia-Nitrogen 0.980 0.1 0.06 mg/L 1.00 98 90-110
Duplicate (6H28072-DUP1) Source: C6H2556-02 Prepared & Analyzed: 08/28/26 Ammonia-Nitrogen 1.31 0.1 0.06 mg/L 1.31 0.3 20
Matrix Spike (6H28072-MS1) Source: C6H2556-02 Prepared & Analyzed: 08/28/26 Ammonia-Nitrogen 2.37 0.2 0.1 mg/L 1.00 1.31 106 80-120 Matrix Spike Dup (6H28072-MSD1) Source: C6H2556-02 Prepared & Analyzed: 08/28/26 Ammonia-Nitrogen 2.40 0.2 0.1 mg/L 1.00 1.31 109 80-120 1 20 Batch 6I01213 - Acid Digest
Blank (6I01213-BLK1) Prepared & Analyzed: 09/02/26
Kjeldahl Nitrogen ND 0.1 0.07 mg/L
LCS (6I01213-BS1) Prepared & Analyzed: 09/02/26
Kjeldahl Nitrogen 0.943 0.1 0.07 mg/L 1.00 94 80-120
Matrix Spike (6I01213-MS1) Source: C6H1429-02RE1 Prepared & Analyzed: 09/02/26 Kjeldahl Nitrogen 1.44 0.1 0.07 mg/L 1.00 0.518 93 42-154 Matrix Spike Dup (6I01213-MSD1) Source: C6H1429-02RE1 Prepared & Analyzed: 09/02/26 Kjeldahl Nitrogen 1.34 0.1 0.07 mg/L 1.00 0.518 82 42-154 7 25 mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
749
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 8 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
Notes and Definitions
J Estimated value
NR Not Reported
ND Analyte NOT DETECTED at or above the Method Detection Limit (if MDL is reported), otherwise at or above the Reportable Detection Limit (RDL)
RDL Reportable Detection Limit
MDL Method Detection Limit
* / (Non-NELAP) NELAP does not offer accreditation for this analyte/method/matrix combination e-Standard_No Alias.rpt
This report applies only to the sample(s) analyzed. As a mutual protection to clients, the public, and Babcock Laboratories, Inc., this report is submitted and accepted for the exclusive use of the Client to whom it is addressed. Interpretation and use of the information contained within this report are the sole responsibility of the Client. Babcock Laboratories, Inc. is not responsible for any misinformation or consequences that may result from misinterpretation or improper use of this report. This report is not to be modified or abbreviated in any way.
Additionally, this report is not to be used, in whole or in part, in any advertising or publicity matter without written authorization from Babcock Laboratories, Inc. The liability of Babcock Laboratories, Inc. is limited to the actual cost of the requested analyses, unless otherwise agreed upon in writing. There is no other warranty expressed or implied.
Enclosed are the analytical results for the submitted sample(s). Babcock Laboratories certify the data presented as part of this report meet the minimum quality standards in the referenced analytical methods. Any exceptions have been noted.
Approval
cc:
Cindy A. Waddell
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
750
Client Name:
Report Date:
Woodard & Curran
P.O. Box 506
Dutch Hause
Adelanto, CA 92301
Contact:
Address: Project Number:
Analytical Report: Page 9 of 9
Project Name:
10-Sep-2026 Work Order Number: C6H2950
Received on Ice (Y/N): Yes Temp: 4 °C
Adelanto Weekly WW 2026
Adelanto WWTP - 19101 Jonathon St.
C6H2950
mailing
6235 River Crest Dr. Ste H
Riverside, CA 92507
CA ELAP No. 2698
EPA No. CA00102
NELAP No. OR4035
LACSD No. 10119
P (951) 653-3351
F (951) 653-1662
www.babcocklabs.com
location
6100 Quail Valley Court
Riverside, CA 92507-0704
751
ADELANTO PUBLIC UTILITY AUTHORITY
A D E L A N T O G O V E R N M E N T A L C E N T E R | 1 1 6 0 0 A I R E X P R E S S W A Y | A D E L A N T O , C A L I F O R N I A 9 2 3 0 1
DATE: October 14, 2026
TO: Honorable Chairman, and Public Utility Authority Members FROM: Jessie Flores, Executive Director
BY: Brenda Lopez, City Clerk/Director of Governmental Services SUBJECT: RESOLUTION 26-07 AUTHORIZING PARTICIPATION IN PROPOSED PFAS CLASS
ACTION SETTLEMENTS
STAFF RECOMMENDATION:
Adopt Resolution No. 26-07 authorizing the Adelanto Public Utility Authority (APUA) to participate in the proposed class action settlements with Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company relating to PFAS contamination of public drinking water.
BACKGROUND:
Litigation involving contamination of water and soil by Per- and Polyfluoroalkyl Substances (PFAS) manufactured by various entities was consolidated in the United States District Court for the District of South Carolina as In Re: Aqueous Film-Forming Foams Product Liability Litigation, MDL No. 2:18-mn2873-RMG.
Proposed settlements have been filed involving Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company to compensate eligible public water systems, including APUA.
Approval of the proposed Resolution will authorize APUA to participate in the settlements and authorize completion and execution of the necessary settlement documentation, releases, and agreements.
The Resolution also authorizes outside counsel to continue pursuing APUA's claims against remaining defendants and other applicable claims related to PFAS contamination. 752
FISCAL IMPACT:
There is no expenditure associated with approval of the Resolution. Any settlement proceeds received by APUA will be determined through the settlement process.
ATTACHMENTS:
1. APUA Resolution No. 26-07
753
APUA RESOLUTION NO. 26-07
RESOLUTION AUTHORIZING THE ADELANTO PUBLIC UTILITY
AUTHORITY (APUA) TO PARTICIPATE IN THE PROPOSED CLASS
ACTION SETTLEMENTS WITH AMEREX CORPORATION, ARCHROMA
U.S., INC., CARRIER GLOBAL CORPORATION, AND NATION FORD CHEMICAL COMPANY IN THE PUBLIC WATER SYSTEMS’ PORTION OF THE MULTI-DISTRICT LITIGATION MATTER, IN RE: AQUEOUS FILMFORMING FOAMS PRODUCT LIABILITY LITIGATION, MDL 2:18-MN2873-RMG, RELATING TO PFAS CONTAMINATION OF DRINKING WATER; AUTHORIZING ADELANTO PUBLIC UTILITY AUTHORITY
(APUA) TO COMPLETE ALL DOCUMENTATION AND EXECUTE ALL
RELEASES AND AGREEMENTS NECESSARY TO PARTICIPATE IN THE SETTLEMENTS WITH AMEREX CORPORATION, ARCHROMA U.S.,
INC., CARRIER GLOBAL CORPORATION, AND NATION FORD
CHEMICAL COMPANY IN THE PUBLIC WATER SYSTEMS’ PORTION OF THE MDL; AND AUTHORIZING OUTSIDE COUNSEL TO CONTINUE TO PURSUE CLAIMS RELATED TO PFAS; PROVIDING AN EFFECTIVE
DATE.
WHEREAS, on December 7, 2018, litigation involving the contamination of water and soil by Per- and Polyfluoroalkyl Substances (PFAS) manufactured by various entities was consolidated in the United States District Court of South Carolina as the In Re:
Aqueous Film-Forming Foams Product Liability Litigation, MDL 2:18-mn-2873-RMG, before the Honorable Richard M. Gergel; and
WHEREAS, settlements have been filed on behalf of manufacturers Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company to compensate public water systems, including Adelanto Public Utility Authority for the contamination and remediation of PFAS; and
NOW, THEREFORE, BE IT RESOLVED BY THE Adelanto Public Utility Authority that this Board
Section 1. Approves and incorporates the foregoing recital as if fully set forth herein.
Section 2. Authorizes the Adelanto Public Utility Autority to participate in the proposed Class Action Settlements with Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company in the Public Water Systems’ portion of the multidistrict litigation matter, In Re: Aqueous Film-Forming Foams Product Liability Litigation, MDL 2:18-mn-2873-RMG, relating to PFAS contamination of public drinking water (hereinafter, the “MDL”).
754
Section 3. Authorizes Outside Counsel to complete all documentation required to participate in the Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company Settlements for the Public Water Systems’ portion of the MDL, such as Claims Forms, and designates Jessie Flores to verify claims on behalf of Adelanto Public Utility Authority
Section 4. Authorizes Jessie Flores to: (a) verify and approve documentation required to participate in the Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company Settlements for the Public Water Systems’ portion of the MDL, such as Claims Forms, that is completed as authorized in Section 3; and (b) execute all releases and agreements necessary to finalize settlements of the Public Water Systems’ portion of the MDL with Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company on behalf of the Adelanto Public Utility Authority
Section 5. Authorizes Outside Counsel to: (a) continue pursuing the Adelanto Public Utility Authroity’s claims against the defendants remaining in the Public Water Systems’ portion of the MDL; and (b) continue pursuing claims against any and all defendants, including Amerex Corporation, Archroma U.S., Inc., Carrier Global Corporation, and Nation Ford Chemical Company, that may be liable for damages to the Adelanto Public Utility Authority that extend beyond the Adelanto Public Utility Authority’s public drinking water.
PASSED, APPROVED AND ADOPTED this 14th day of October 2026. ______________________________
Gabriel Reyes, President
_______________________________
Brenda Lopez, CMC, City Clerk
755
I, Brenda Lopez, City Clerk of the City of Adelanto, California, do hereby certify that the foregoing Resolution No. 26-07 was duly and regularly adopted at a regular meeting of the Board of Directors of the Adelanto Public Utility Authority on this 14th day of October 2026, be the following vote to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS THEREOF, I hereunto set my hand and affix the official seal of the City of Adelanto on the 14th day of October, 2026.
______________________________
Brenda Lopez, CMC, City Clerk
756