DRAFT Alameda Active Transportation Plan
Appendix G: Active Transportation Project
Prioritization

SUMMARY OF PRIORITIZATION

PROCESS
The priority projects included in the 2030 Infrastructure Plan list were selected through a two-step process.

First, all capital project recommendations from the Pedestrian Network, Bicycle Network and Trails Network chapters were scored and ranked using a data-driven evaluation process, explained in detail further below in this Appendix. The results of this prioritization process are intended to help reveal a project’s ability to meet Plan goals, independent of other factors such as cost, coordination with other efforts, etc.

The bicycle project prioritization criteria were applied to both the bicycle and trail recommended projects. The scoring criteria gave the highest weight to safety, creating a connected and low stress network, and equity.

Criteria also included trip potential for each project, based on a data-driven evaluation of city streets with the highest potential for bicycle trips.

The pedestrian prioritization criteria were applied differently than that for bicycling since the pedestrian network is the entire city. All public streets were scored, by segment, with the heaviest weight going toward safety, access to schools, and equity. Other criteria included access to transit, parks, libraries and commercial areas.

Almost all of the projects and street segments that ranked “high” through either the bicycle or pedestrian prioritization analyzes have been included in the 2030 Infrastructure Plan list. Other included projects were ranked “medium.” In some cases, projects and street segments were ranked high for both walking and biking, such as along Park Street and Webster Street, illustrating a strong need for improvements and investments.

Second, the resulting high-ranking projects were assessed using more qualitative knowledge and expertise. The overall goals of this planning effort, including creating a connected, low-stress network that eliminates the many gaps in the existing bikeway network, was considered. The City considered the current construction and planning efforts underway that will continue to require staffing and funding resources. Projects that were not evaluated using the data-driven prioritization process were considered, such as the need for maintenance, including trail maintenance, and improving water crossings and access to them. Community priorities were also considered, as they have been expressed throughout this planning process, and others that have occurred over the past three years. Finally, known opportunities, professional judgement, funding and feasibility were layered in, to develop the 2030 Infrastructure Plan.

While a thorough process was conducted, over the next eight years, new opportunities may arise through other processes such as new development, repaving projects, or funding opportunities, and a lower-ranked project may become ripe for implementation.

Alameda Active Transportation Plan Active Transportation Project List | 3

PRIORITIZATION METHODOLOGY

OVERVIEW
A data-driven prioritization process was the first input used to guide the selection of priority bicycle, pedestrian and trail capital projects for investments in the coming years. All projects or street segments were objectively scored and ranked, based on the plan’s goals. These prioritization results will continue to be used in the future to help select street or trail segments for prioritization of improvements, such as for pedestrian crossing improvements or trail maintenance. The outputs of these prioritization processes are only one factor that were, or will be, used for final project selection.

T
he prioritization criteria were categorized by four of the five plan goals: Safety, Equity, Connectivity and Comfort, and Mode Shift. (The Community goal was not included since it addresses programs, and not capital projects.) There is some overlap in what each criterion is measuring. The overall weight for each goal is the highest number of points possible, based on the sum of the criteria scores under that goal. The point values for each criterion are based on weights that reflect the Plan’s vision statement, City policies, City staff input, feedback received during public engagement activities completed for the Plan, and those used in other, similar plans from cities in California.

The sections below present the criteria used for the bicycle/trail and pedestrian/trail networks prioritization analysis, maps of the results of the analysis, and detailed project lists with individual project or street rankings.

PEDESTRIAN NETWORK

PRIORITIZATION
The criteria in Table 1 were applied to all public street segments in the city of Alameda, which almost all include pedestrian facilities of some type, plus all walkways and shared-use trails. The results of applying these criteria are illustrated, ranked by high, medium and low score ranges, in Figure 1. Those street segments/trails that scored “High” (from 60 to 110 points) are listed in Table 2.

Alameda Active Transportation Plan Active Transportation Project List | 4 Prioritization criteria for the pedestrian network are shown in Table 1. These criteria were used to prioritize streets for pedestrian improvements since specific pedestrian projects were not identified as part of the Plan. The results of the pedestrian network prioritization approach will be used to identify opportunities for pedestrian crossing improvements and locations where the City can prioritize installing the pedestrian treatments in the treatment matrix.

Table 1. Pedestrian Prioritization Criteria
Criteria Measure Description Points
Goal: Increase Mode Share Highest Number of Points Possible 10 Connections
to Transit
Within ¼ mile of high-
frequency transit corridor
or Transbay bus stops, or
ferry terminals
Prioritizes projects in close proximity to major transit stops and ferry terminals to help close first-last mile gaps and enable longer trips to be taken using active transportation. 1 10
Goal: Increase Safety Highest Number of Points Possible 45 Pedestrian
High Injury
Corridor
Street is on a Pedestrian
High Injury Corridor
Prioritizes making pedestrian safety improvements along streets identified as a Pedestrian High Injury Corridor.

Streets rated as Tier 1 receive 35 points, streets rated as Tier 2 receive 30 points, and streets rated as Tier 3 receive 25 points.
35 High-crash
intersections
Street c ontains
intersection(s) with high
crash intensity
Prioritizes street segments that intersect with more than one high-crash intersection. Defined by Vision Zero Crash
Analysis. Only includes crashes involving pedestrians.
10 Prioritizes streets that intersect with one high-crash intersection. Defined by Vision Zero Crash Analysis. Only includes crashes involving pedestrians.
5 Goal: Increase Connectivity and
Comfort Highest Number of Points Possible 35
Proximity to
Schools
Street, trail, or walkway is
within 600 feet of the
edge of school property
Prioritizes walking facilities that connect to schools. 15 Proximity to
other
Community
Destinations
Street has a Community
Destinations Overlay, per
the Pedestrian Street
Typology
Prioritizes streets along the perimeters of parks, libraries, hospitals, senior centers, and colleges. 10
Commercial
Area
Street is a Business Main
Street, per Pedestrian
Street Typology
Prioritizes walking facilities within commercial areas. 10 Goal: Increase Equity Highest Number of Points Possible 20 1 As of May 2022 when the criteria were developed, these Transbay routes included Line O (Santa Clara – Encinal Transbay); OX (Bay Farm – Park St. Transbay); and W (High – South Shore Transbay). High-frequency corridors are those with fixed route bus service with service intervals no longer than 15 minutes during peak weekday commute hours.

Alameda Active Transportation Plan Active Transportation Project List | 5 Criteria Measure Description Points
Community
Vulnerability
Level
Street meets one of
above criteria (i.e., has
greater than zero points)
and is within the
“highest” or “high” level
of community
vulnerability
Further prioritizes streets, trails and walkways within areas identified as having a high share of vulnerable communities, as defined by the San Francisco Bay Conservation and
Development Commission (BCDC).
2 20
TOTAL POINTS POSSIBLE 110
2 The City formalized its use of this BCDC map for assessing community vulnerability in May 2022 at the Transportation Commission meeting.

Alameda Active Transportation Plan Active Transportation Project List | 6 Fi
gure 1. Pedestrian Network (Streets & Trails) Prioritization Results

Alameda Active Transportation Plan Active Transportation Project List | 7 T
able 2. Pedestrian Network with High Prioritization Ranking Street Name From Extent To Extent
Complete
Streets
Potential
Project3
Central Av Webster St Sixth St No
Grand St Shoreline Dr Otis Dr No
Lincoln Av Park St/Tilden Wy Oak St Yes
Oak St Buena Vista Av Lincoln Av Yes
Oak St Santa Clara Ave Encinal Av Yes
Otis Dr Rock Isle Park Av No
Otis Dr Mound St Court St No
Park St Blanding Av Shoreline Dr Yes
Shoreline Dr Sunset Rd Kittyhawk Rd No
Webster St Willie Stargell Av Atlantic Av No
Webster St Atlantic Av Central Av Yes
3 Segments flagged as Complete Streets indicate street segments that ranked “High” in both the bicycle and pedestrian prioritization analyses.

BICYCLE NETWORK PRIORITIZATION
The criteria in Table 3 were applied to all of the proposed bicycle facilities included as part of the Bicycle Vision Network, including shared-used trails. Refer to Chapter 5: Bicycle Network in the Active Transportation Plan (ATP) for a map of the network. The results of applying these criteria are illustrated, ranked by high, medium and low score ranges, in Figure 2. All of the proposed bicycle projects included in the Bicycle Vision Network are listed in Table 4, with their Prioritization Ranking, proposed bikeway type, estimated cost and lead agency.

Note that existing bikeways and projects planned for construction by 2024 were not scored using this prioritization analysis, since they are completed or funded and underway. In addition, water crossing projects (e.g., bridges) are a high priority for the City because of the important regional connections these facilities provide, regardless of the prioritization score these projects received during this phase of the analysis.

Table 3. Bicycle Network Prioritization Criteria
Criteria Measure Description Points
Goal: Increase Mode Share Highest Number of Points Possible 15 Bicycle Trip
Potential
Projects categorized based on
scores generated from the trip
potential analysis (see Appendix
F)
Trip potential score consists of population
and employment density, intersection
density, percentage of households living
below the poverty line, and transit.

Recommended bikeways in areas with
higher trip potential score higher. Bikeways
were ranked based on their trip potential
score derived from an area weighted
average. Bikeways that rank within the top
33% receive 10 points, those in the middle
receive 5 points, and those that rank below
that do not receive any points for this
metric.
10 Regional
Connections
¼ mile from ferry terminal, high-
frequency transit corridor,
Transbay bus stop, or existing
bridge/tubes
Prioritizes projects in close proximity to
major transit stops and estuary crossings to
help close first-last mile gaps and enable
longer trips to be taken using active
transportation.4
5 Goal: Increase Safety Highest Number of Points Possible 30 Bicycle High Injury
Corridor
Project is on the City’s Bicycle
High Injury Corridor or provides a
parallel route within two blocks of
the HIC
Prioritizes projects identified as High Injury
Corridors for bicyclists or that provide a
convenient alternative route.
15 High-crash
intersections
Projects contains intersection(s)
with high crash intensity
Prioritizes projects that intersect with more
than one high-crash intersection. Defined by
Vision Zero Crash Analysis. Only includes
crashes involving bicyclists.
10 Prioritizes projects that intersect with one
high-crash intersection. Defined by Vision 5
4 As of May 2022, these Transbay routes include Lines O (Santa Clara – Encinal Transbay); OX (Bay Farm – Park St. Transbay); and W (High – South Shore Transbay). High-frequency corridors are those with fixed route bus service with service intervals no longer than 15 minutes during peak weekday commute hours.

Alameda Active Transportation Plan Active Transportation Project List | 9 Criteria Measure Description Points
Zero Crash Analysis. Only includes crashes
involving bicyclists.

Level of Traffic
Stress (LTS)
LTS 3 or LTS 4 or provides parallel
route within two blocks (see
Appendix F for map of LTS)
Prioritizes projects on segments that have
higher stress levels or provide a nearby
alternative route.
5 Goal: Increase Connectivity and Comfort Highest Number of Points Possible 35 Connections to
commercial
streets
Is adjacent to, within one block of,
intersects with or ends at a
Community Mixed-Use land use
area
Prioritizes projects that provide access to
commercial corridors and businesses. 10
Direct access to
Schools and other
Community
Destinations
Is adjacent to, within one block of,
or intersects with, or ends at a
school or Community Destination
(e.g., park, library, or senior center)
This measure prioritizes bikeways based on
whether they increase access to schools or
other Community Destinations. A bikeway
that intersects or is within approximately
one block of a school receives 10 points. If a
bikeway connects to a Community
Destination but not a school, it receives 5
points. If a bikeway connects to a school
and a Community Destination it receives 10
points. Community Destinations are defined
in the Pedestrian Street Typology.
10 Low-stress
bikeway5
Recommended low-stress bikeway
(i.e., Shared use Path, Separated
Bike Lane, or Neighborhood
Greenway)
Prioritizes all ages and abilities bikeways,
with special emphasis on low-stress
bikeways.
5 Recommended low-stress bikeway
that connects with existing low-
stress bikeway
Prioritizes all ages and abilities bikeways,
with special emphasis on low-stress
network connectivity.
5 Recommended low-stress bikeway
that runs north-south on main
island
Prioritizes low-stress bikeways that improve
north-south network connectivity on main
island.
5 Goal: Increase Equity Highest Number of Points Possible 20 Community
Vulnerability Level
R ecommended bikeway within the
“highest” or “high” level of
community vulnerability
Prioritizes projects within areas identified as
having a high share of vulnerable
communities, as defined by the San
Francisco Bay Conservation and
Development Commission (BCDC).6
2 0
TOTAL POINTS POSSIBLE 100
5 Low-stress bikeway refers to the specific low-stress bikeways defined as part of the Active Transportation Plan, such as Class I Multi-Use Paths, Class IV Separated Bicycle Lanes, and Class III Neighborhood Greenways. These bikeways will increase ridership among “interested, but concerned” bicyclists.
6 The City formalized its use of this BCDC map for assessing community vulnerability in May 2022 at the Transportation Commission meeting.

Alameda Active Transportation Plan Active Transportation Project List | 10 Figure 1. Bicycle Network Prioritization Results.

Alameda Active Transportation Plan Active Transportation Project List | 11 Table 4. Bicycle Vision Network Project List
Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
145 Adelphian Wy Mecartney Rd Harbor Bay Pw Neighborhood Greenway (Class IIIB) 0.12 $64,463 Low City of Alameda 94 Alameda Av Walnut St Benton St/Central Av Neighborhood Greenway (Class IIIB) 0.84 $469,186 Medium City of Alameda 12 Alameda Point Trail Main St Dog Park Future DePave Park Shared Use Path (Class I) 4.71 $21,690,042 Medium City of Alameda 41 Atlantic Av Constitution Wy Sherman St/Wind River Wy Buffered Bike Lane (Class IIB) 0.67 $219,758 Medium City of Alameda 82 Ballena Bl Central Av/Fourth St Cola Ballena Separated Bike Lane (Class IV) 0.16 $117,650 Low City of Alameda 98 Ballena Bl San Francisco Bay Cola Ballena Two-way Separated Bike Lane (Class IV) 0.68 $290,429 Low City of Alameda 148 Bay Edge Rd Aughinbaugh Wy/Ratto Rd Harbor Bay Pw Bike Lane (Class II) 0.11 $26,974 Low City of Alameda 138 Bayview Dr Broadway High St/Otis Dr Neighborhood Greenway (Class IIIB) 0.46 $258,670 Low City of Alameda 137 Bayview Dr Connection Bayview Dr Bay Trail in Bird Sanctuary Shared Use Path (Class I) 0.03 $146,714 Low City of Alameda 140 Bird Sanctuary Broadway Bayview Dr Connector Trail Shared Use Path (Class I) 0.42 $1,922,657 Low City of Alameda 83 Blanding Av Oak St Park St Separated Bike Lane (Class IV) 0.13 $93,541 High City of Alameda 95 Blanding Av Tilden Wy Trail Fernside Bl/Tilden Wy Separated Bike Lane (Class IV) 0.01 $8,745 Medium City of Alameda 93 Blanding Av Tilden Wy Trail Broadway Buffered Bike Lane (Class IIB) 0.08 $25,700 Low City of Alameda 79+ Blanding Ave Oak St Elm St Bike Lane (Class II) 0.12 $29,991 High Private Developer 52 Buena Vista Av Fifth St Poggi St Bike Lane (Class II) 0.13 $32,901 Medium City of Alameda 163 C St Connection Silva Ln C St Shared Use Path (Class I) 0.1 $450,019 Low City of Alameda 131 Calhoun St Versailles Av Court St Neighborhood Greenway (Class IIIB) 0.16 $88,647 Low City of Alameda 157 Catalina Av Holly St Fontana Dr/Via Alamosa Neighborhood Greenway (Class IIIB) 0.5 $281,823 Low City of Alameda 129 Central Av High St Fernside Bl Neighborhood Greenway (Class IIIB) 0.24 $132,042 Low City of Alameda 76* Central Av Ninth St Main St/Pacific Av/W Pacific
Av
Separated Bike Lane (Class IV) 1.33 $970,362 Not Applicable City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 12 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
p Central Av Ninth St Sherman St Bike Lane (Class II) 0.39 $97,745 Not Applicable City of Alameda 38 Challenger Dr Marina Village Pw Atlantic Av/Challenger Dr - Jean Sweeney Park
Connection
Separated Bike Lane (Class IV) 0.13 $97,006 Low** City of Alameda 42 Challenger Dr - Jean Sweeney Park Connection Shared Use Path (Class I) 0.09 $398,136 Low 88 Chestnut St Clement Av Clinton Av Neighborhood Greenway (Class IIIB) 0.8 $448,425 Medium City of Alameda 59 Clement Av Grand St Ohlone St Separated Bike Lane (Class IV) 0.16 $118,452 Low City of Alameda 108 Clinton Av Chestnut St Walnut St Neighborhood Greenway (Class IIIB) 0.36 $200,266 Low City of Alameda 119 Clinton Av Oak St Park St To Be Determined 0.05 To Be Determined Low City of Alameda 110 Coral Reef Pl Sunset Rd Coral Reef Rd Neighborhood Greenway (Class IIIB) 0.05 $26,526 Low City of Alameda 35 Coral Sea St Poggi St Willie Stargell Av Neighborhood Greenway (Class IIIB) 0.37 $208,596 Medium City of Alameda 37 Coronado St Pan Am Wy Coronado Av Bike Lane (Class II) 0.13 $33,313 Medium City of Alameda 128 Court St Calhoun St Lincoln Av Neighborhood Greenway (Class IIIB) 0.67 $376,288 Medium City of Alameda 139 Court St Bayview Dr Waterton St Neighborhood Greenway (Class IIIB) 0.05 $29,249 Low City of Alameda 49 Cross Alameda Trail Sherman St Clement Av/Encinal
Basin/Entrance Rd
Separated Bike Lane (Class IV) 0.26 $192,827 Medium Private Developer 142 Doolittle Dr Island Dr Harbor Bay Pw Separated Bike Lane (Class IV) 0.5 $367,858 Low City of Alameda 50 Eagle Av St Charles St Sherman St Neighborhood Greenway (Class IIIB) 0.14 $80,162 Medium City of Alameda 66 Eagle Av Grand St Hibbard St Neighborhood Greenway (Class IIIB) 0.05 $29,979 Low City of Alameda 85 Eighth Street Connection
at Washington Park
Portola Av Central Av Shared Use Path (Class I) 0.13 $607,561 Medium City of Alameda 44 Eight Street - Jean
Sweeney Park Connection
Shared Use Path (Class I) 0.04 $195,030 Low City of Alameda 55 Eighth St Eight Street - Jean Sweeney
Park Connection/Stewart Ct
90 ft southwest of Lincoln
Av/Constitution Wy/Eighth
St
Neighborhood Greenway (Class IIIB) 0.25 $139,072 High City of Alameda 91 Eighth St Westline Dr Portola Av Separated Bike Lane (Class IV) 0.18 $133,783 Medium City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 13 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
78+ Elm St Blanding Ave Clement Av Bike Lane (Class II) 0.07 $16,820 High Private Developer 126 Encinal Av High St Broadway Buffered Bike Lane (Class IIB) 0.47 $154,307 Medium City of Alameda 133 Encinal Av Eastshore Dr Fernside Bl Neighborhood Greenway (Class IIIB) 0.09 $50,750 Medium City of Alameda 2 Estuary Park Pathway Mosely Av Mitchell Ave Shared Use Path (Class I) 0.05 $250,320 Medium City of Alameda 118.2 Fernside Bl High St Blanding Av/Tilden Wy Separated Bike Lane (Class IV) 0.49 $355,989 High City of Alameda 118.1 Fernside Bl San Jose Av High St Separated Bike Lane (Class IV) 0.87 $631,196 Medium City of Alameda 34 Fifth St Ralph Appezzato Memorial Pw Willie Stargell Av Separated Bike Lane (Class IV) 0.37 $267,607 High City of Alameda 69 Fifth St Central Av Buena Vista Av Neighborhood Greenway (Class IIIB) 0.4 $223,657 High City of Alameda 14 Fifth St Willie Stargell Av Mitchell Av Buffered Bike Lane (Class IIB) 0.35 $114,262 Medium City of Alameda 153 Fir Av Holly St/Oleander Av Fir Pl/Marianas Ln Neighborhood Greenway (Class IIIB) 0.32 $179,943 Low City of Alameda 154 Fir Pl Fir Av/Marianas Ln Catalina Av Neighborhood Greenway (Class IIIB) 0.17 $94,563 Low City of Alameda 147 Fontana Dr Baywood Rd/Mecartney Rd Catalina Av/Via Alamosa Neighborhood Greenway (Class IIIB) 0.26 $145,609 Low City of Alameda 125 Garfield Av Eastshore Dr/Fernside Bl High St Neighborhood Greenway (Class IIIB) 0.24 $132,162 Medium City of Alameda 106 Gibbons Dr High St Lincoln Av Neighborhood Greenway (Class IIIB) 0.41 $229,109 Medium City of Alameda

89.3 Grand St Encinal Av Grand Marina Trail Separated Bike Lane (Class IV) 0.74 $536,689 High City of Alameda

89.1 Grand St Shoreline Dr Dayton Av Separated Bike Lane (Class IV) 0.44 $318,951 Medium City of Alameda

89.2 Grand St Dayton Av Encinal Av Separated Bike Lane (Class IV) 0.27 $199,246 Medium City of Alameda 77 Hancock St W Ticonderoga Av San Francisco Bay Bike Lane (Class II) 0.28 $71,029 Medium City of Alameda

77.1 Hancock St Central Av/Lincoln Av W Ticonderoga Av Bike Lane (Class II) 0.03 $7,615 Low City of Alameda 146 Harbor Bay Pw Bay Edge Rd Adelphian Wy Neighborhood Greenway (Class IIIB) 0.27 $148,289 Low City of Alameda 164 Harbor Bay Pw Ron Cowan Pw Shoreline Park Separated Bike Lane (Class IV) 1.34 $976,639 Low City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 14 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
155 Harbor Bay Pw Shoreline Park Bay Edge Rd Bike Lane (Class II) 0.32 $80,939 Low City of Alameda 63 Hibbard St Clement Av Eagle Av Neighborhood Greenway (Class IIIB) 0.07 $38,198 Medium City of Alameda 113 High St Lincoln Av High Street Bridge/Marina Dr Bike Route (Class III) 0.32 $6,434 Medium City of Alameda 120 High St Garfield Av Lincoln Av Neighborhood Greenway (Class IIIB) 0.02 $12,080 Low City of Alameda 158 Holly St Catalina Av Fir Av/Oleander Av Neighborhood Greenway (Class IIIB) 0.15 $85,810 Low City of Alameda 144 Island Dr Doolittle Dr Mecartney Rd Bike Lane (Class II) 0.83 $206,872 Medium City of Alameda 152 Island Dr Mecartney Rd Catalina Av/N Loop Rd
Connection
Buffered Bike Lane (Class IIB) 0.37 $122,391 Low City of Alameda 116 Kittyhawk Pl Kittyhawk Rd Greenbrier Rd/Whitehall Pl Neighborhood Greenway (Class IIIB) 0.05 $27,074 Medium City of Alameda 17 Lexington St Navy Way St/W Red Line Av W Tower Av Separated Bike Lane (Class IV) 0.39 $281,720 Medium City of Alameda 73 Lincoln Av Fifth St/Marshall Wy Park St/Tilden Wy Buffered Bike Lane (Class IIB) 2.41 $795,351 High City of Alameda 104 Lincoln Av Park St/Tilden Wy High St Neighborhood Greenway (Class IIIB) 0.75 $420,897 High City of Alameda 136 Lincoln Middle School
Connection
Existing Bay Trail Eastshore Dr Shared Use Path (Class I) 0.07 $327,119 Medium City of Alameda 20 Main St Central Av/Pacific Av/W
Pacific Av
Navy Way St Two-way Separated Bike Lane (Class IV) 1.4 $603,602 High City of Alameda/ Private Developer
150 Maitland Dr Corica Park Golf Course Island Dr Bike Route (Class III) 0.72 $14,390 Low City of Alameda 161 Maitland Dr Harbor Bay Pw Corica Park Golf Course Bike Lane (Class II) 0.12 $29,882 Low City of Alameda 25 Marina Village Pw Mariner Square Dr/Mariner
Square Lp
75 ft southwest of
Challenger Dr/Marina Village
Pw
Separated Bike Lane (Class IV) 0.75 $544,713 Medium** City of Alameda 6 Mariner Square Dr Marina Village Pw/Mariner
Square Lp
Webster Tube Separated Bike Lane (Class IV) 0.17 $125,841 Medium City of Alameda 24 Mariner Square Lp 110 ft southwest of E Campus
Dr/Mariner Square Lp/Willie
Stargell Av
E Campus Dr/Willie Stargell
Av
Bike Lane (Class II) 0.02 $5,227 High City of Alameda
10 Mariner Square Lp Mitchell Av Marina Village Pw/Mariner Square Dr
Buffered Bike Lane (Class IIB) 0.09 $30,411 Medium City of Alameda 62 Marshall Wy Fifth St/Lincoln Av Fourth St/Pacific Av Separated Bike Lane (Class IV) 0.21 $154,206 Medium City of Alameda 149 Mecartney Rd Island Dr Maitland Dr/Melrose Av Bike Lane (Class II) 0.34 $84,470 Low City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 15 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
156 Melrose Av Hillery Wy/Oleander Av Maitland Dr/Mecartney Rd Neighborhood Greenway (Class IIIB) 0.26 $144,506 Low City of Alameda 92 Miller-Sweeney Bridge Shared Use Path (Class I) 0.17 $770,358 Medium City of Alameda 8 Mitchell Av Mariner Square Lp Fifth St Buffered Bike Lane (Class IIB) 0.14 $47,629 Medium City of Alameda 3 Mitchell Av Bette St Main St Bike Lane (Class II) 0.57 $143,071 Not Applicable City of Alameda 21 Monarch St Alameda Point Trail W Red Line Av Two-way Separated Bike Lane (Class IV) 0.59 $254,633 Medium City of Alameda 90 Morton St San Antonio Av San Jose Av Neighborhood Greenway (Class IIIB) 0.08 $42,893 Medium City of Alameda

28.1+ Mosley Av Ralph Appezzato Memorial Pw Willie Stargell Av Neighborhood Greenway (Class IIIB) 0.38 $210,456 High City of Alameda 16 Mosley Av Carl Vinson Singleton Av Neighborhood Greenway (Class IIIB) 0.01 $3,913 Medium City of Alameda

28.2+ Mosley Av Willie Stargell Av Singleton Av Neighborhood Greenway (Class IIIB) 0.16 $87,670 Medium Federal 9 Mosley Av Singleton Av Estuary Park
Pathway/Monterey Ci
Bike Lane (Class II) 0.22 $53,714 Low City of Alameda
132 Mound St Calhoun St Waterton St Neighborhood Greenway (Class IIIB) 0.15 $81,693 Medium City of Alameda 162 N Loop Rd Harbor Bay Pw/S Loop Rd Harbor Bay Pw Buffered Bike Lane (Class IIB) 0.76 $252,223 Low City of Alameda 159 N Loop Rd Connection Catalina Av/Island Dr N Loop Rd Shared Use Path (Class I) 0.06 $288,003 Low City of Alameda 4 Navy Way St Lexington St/W Red Line Av Third St Separated Bike Lane (Class IV) 0.07 $51,532 Medium City of Alameda 1 Navy Way St Third St Main St Two-way Separated Bike Lane (Class IV) 0.05 $20,233 Medium City of Alameda 31 Neptune Park Webster St Constitution Av Shared Use Path (Class I) 0.08 $386,843 Medium City of Alameda 70 Nineth St San Antonio Av Jean Sweeney Park Neighborhood Greenway (Class IIIB) 0.65 $363,651 Medium City of Alameda 99 CS Oak St Clinton Av Blanding Ave Low Stress Bikeway - Type TBD 0.87 $634,759 High City of Alameda 122 Oak St Clinton Av Park St to Otis Dr
Connector/Powell St
Neighborhood Greenway (Class IIIB) 0.19 $103,424 Medium City of Alameda 127 Oak St to Otis Dr
Connector
Oak St/Powell St Otis Dr/Park St Shared Use Path (Class I) 0.04 $173,778 Medium City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 16 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
160 Oleander Av Fir Av/Holly St Magnolia Dr Neighborhood Greenway (Class IIIB) 0.41 $226,932 Low City of Alameda 13 Orion St 200 ft south of Orion
St/Corpus Christi Rd
Main St Separated Bike Lane (Class IV) 0.19 $139,918 High Private Developer

58.1+ Orion St Oriskany Av W Atlantic Av Separated Bike Lane (Class IV) 0.34 $245,347 High Private Developer 27+ Orion St 140 ft south of Orion
St/Coronado Av
W Midway Av Separated Bike Lane (Class IV) 0.23 $167,776 High Private Developer

58.2+ Orion St W Hornet Av Oriskany Av Separated Bike Lane (Class IV) 0.23 $164,330 High Private Developer 64 Oriskany Av Central Av Ferry Point Bike Route (Class III) 0.45 $9,002 Medium City of Alameda 130 Otis Dr Broadway Park St Buffered Bike Lane (Class IIB) 0.24 $78,207 Medium City of Alameda 134 Otis Dr Broadway Bay Farm Island
Bridge/Fernside Bl/Towata
Park
Bike Lane (Class II) 0.6 $148,922 Medium City of Alameda 105 Otis Dr Grand St Rosewood Wy Separated Bike Lane (Class IV) 0.05 $37,073 Medium City of Alameda 123 Otis Dr Park St Willow St Separated Bike Lane (Class IV) 0.38 $274,701 Medium City of Alameda 72 Pacific Av Fourth St/Marshall Wy Park St Neighborhood Greenway (Class IIIB) 2.64 $1,480,830 High City of Alameda 57 Pacific Av Fourth St/Marshall Wy Central Av/Main St/W Pacific Av
Separated Bike Lane (Class IV) 0.28 $207,028 High City of Alameda 33 Pacific Marina Kingsbury Ct/Triumph Dr Shoreline Park Connection Bike Lane (Class II) 0.04 $10,907 Low City of Alameda 11 Pan Am Wy W Midway Av Main St Separated Bike Lane (Class IV) 0.29 $213,764 Medium City of Alameda

26.1 Pan Am Wy Coronado St W Tower Av Two-way Separated Bike Lane (Class IV) 0.08 $33,742 Medium City of Alameda

26.2* Pan Am Wy W Tower Av W Midway Av Two-way Separated Bike Lane (Class IV) 0.18 $78,569 Not Applicable City of Alameda 109 CS Park St Blanding Av Shoreline Dr Low Stress Bikeway - Type TBD 1.33 $971,331 High City of Alameda 84 Park St Bridge 23rd Av Blanding Av Shared Use Path (Class I) 0.13 $592,578 Medium City of Alameda 47 Poggi St Coral Sea St Buena Vista Av Bike Lane (Class II) 0.18 $44,127 Medium City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 17 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
22 Posey Tube to Neptune
Park Connection
Willie Stargell Av/Webster St Posey Tube Entrance Shared Use Path (Class I) 0.3 $1,360,431 Medium Alameda CTC 151 Ratto Rd Aughinbaugh Wy/Bay Edge Rd 195 ft north of Souza Ct/Ratto Rd
Neighborhood Greenway (Class IIIB) 0.44 $245,990 Low City of Alameda 143 Robert Davey Jr Dr Bridgeway Rd/Island Dr Packet Landing Rd Buffered Bike Lane (Class IIB) 0.11 $35,468 Low City of Alameda 60 Saint Charles St Pacific Av/St Charles St Buena Vista Av/St Charles St Neighborhood Greenway (Class IIIB) 0.07 $38,057 Medium City of Alameda 87 San Antonio Av Nineth St Morton St Neighborhood Greenway (Class IIIB) 0.46 $257,088 Medium City of Alameda 115.1 San Jose Av Morton St Broadway Neighborhood Greenway (Class IIIB) 1.27 $711,992 Medium City of Alameda 115.2 San Jose Av Fernside Bl Broadway Neighborhood Greenway (Class IIIB) 0.69 $387,478 Medium City of Alameda 107 Sand Beach Pl Sand Beach Rd Harbor Light Rd Neighborhood Greenway (Class IIIB) 0.05 $26,132 Low City of Alameda 102 Santa Clara Av Versailles Av Park St Bike Route (Class III) 0.39 $7,791 High City of Alameda 100 Santa Clara Av Oak St Park St Bike Lane (Class II) 0.09 $22,578 Medium City of Alameda 67 Santa Clara Av Pacific Av Third St Bike Route (Class III) 0.25 $5,049 Medium City of Alameda

18.2 Saratoga St Third St/W Red Line Av W Midway Av Separated Bike Lane (Class IV) 0.2 $148,131 Medium City of Alameda

18.1* Saratoga St W Midway Av W Tower Av Separated Bike Lane (Class IV) 0.18 $132,801 Not Applicable City of Alameda 68 Seaplane East W Pacific Av W Hornet Av Separated Bike Lane (Class IV) 0.33 $237,127 Medium City of Alameda 36 Seaplane North Monarch St Pan Am Wy Two-way Separated Bike Lane (Class IV) 0.56 $242,543 Medium City of Alameda 40 Seaplane North Trail (Future) DePave Park Alameda Waterfront Park Shared Use Path (Class I) 0.55 $2,548,069 Medium City of Alameda 103 Shell Gate Pl Fair Haven Rd Shell Gate Rd/Shorepoint Ct Neighborhood Greenway (Class IIIB) 0.05 $26,993 Low City of Alameda 54 Sherman St Eagle Av Buena Vista Av Bike Lane (Class II) 0.07 $17,097 Medium City of Alameda 48 Sherman St Eagle Av Atlantic Av/Wind River Wy Buffered Bike Lane (Class IIB) 0.14 $47,177 Low City of Alameda 32 Shoreline Park Connection Shared Use Path (Class I) 0.17 $763,248 Medium City of Alameda 51 St Charles St Buena Vista Av/Saint Charles
St
St Charles St - Jean Sweeney
Park Connection
Neighborhood Greenway (Class IIIB) 0.12 $64,500 Medium City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 18 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency
74 St Charles St San Antonio Av Pacific Av/Saint Charles St Neighborhood Greenway (Class IIIB) 0.46 $257,944 Medium City of Alameda 46 St Charles St - Jean
Sweeney Park Connection
Shared Use Path (Class I) 0.08 $344,973 Low City of Alameda 61 Third St Ralph Appezzato Memorial Pw Central Av/Taylor Av Neighborhood Greenway (Class IIIB) 0.49 $273,081 High City of Alameda 5 Third St Saratoga St/W Red Line Av Navy Way St Separated Bike Lane (Class IV) 0.07 $51,314 Medium City of Alameda 86 Tideway Dr San Francisco Bay San Francisco Bay Bike Route (Class III) 0.26 $5,203 Low City of Alameda 96 Tilden Wy Miller-Sweeney Bridge Lincoln Av/Park St Separated Bike Lane (Class IV) 0.57 $412,695 Medium City of Alameda 141 Towata Park Connection Shared Use Path (Class I) 0.1 $435,630 Medium City of Alameda 39 Triumph Dr Kingsbury Ct/Pacific Marina Atlantic Av/Triumph Dr - Jean Sweeney Park
Connection
Bike Lane (Class II) 0.13 $32,299 Low City of Alameda
43 Triumph Dr - Jean
Sweeney Park Connection
Shared Use Path (Class I) 0.07 $321,489 Medium City of Alameda 114 Versailles Av Fernside Bl Calhoun St Neighborhood Greenway (Class IIIB) 0.95 $529,222 Medium City of Alameda 15 W Essex Dr Pan Am Wy Saratoga St Buffered Bike Lane (Class IIB) 0.23 $74,699 Medium City of Alameda 75 W Hornet Av Hancock St Seaplane Lagoon East Trail Separated Bike Lane (Class IV) 0.54 $391,789 Medium City of Alameda

19.3 W Midway Av Main St/Willie Stargell Av Pan Am Wy Two-way Separated Bike Lane (Class IV) 0.38 $161,598 Medium City of Alameda

19.1 W Midway Av Monarch St Saratoga St Two-way Separated Bike Lane (Class IV) 0.34 $146,101 Medium City of Alameda

19.2* W Midway Av Pan Am Wy Saratoga St Two-way Separated Bike Lane (Class IV) 0.23 $97,031 Not Applicable City of Alameda 56 W Pacific Av Ferry Point Central Av/Main St/Pacific
Av
Separated Bike Lane (Class IV) 0.4 $289,211 Medium City of Alameda 7 W Red Line Av Barbers Point Rd/Pan Am Wy Alameda National Wildlife Refuge (future)
Two-way Separated Bike Lane (Class IV) 0.68 $291,934 Medium City of Alameda

71.2 W Ticonderoga Av Hancock St Seaplane East Bike Lane (Class II) 0.4 $99,361 Medium City of Alameda 30 W Tower Av Main St Pan Am Wy Bike Lane (Class II) 0.38 $95,339 Medium City of Alameda

29.1 W Tower Av Monarch St Saratoga St Separated Bike Lane (Class IV) 0.34 $247,617 Medium City of Alameda Alameda Active Transportation Plan Active Transportation Project List | 19 Project
ID
Name From Extent To Extent Proposed Bikeway Type Length (mi) Estimated Cost Prioritization Rank
Lead Agency

29.2* W Tower Av Saratoga St Pan Am Wy Separated Bike Lane (Class IV) 0.23 $164,171 Not Applicable City of Alameda 101 Walnut St Encinal Av Central Av Bike Route (Class III) 0.14 $2,734 Medium City of Alameda 111 Walnut St Clinton Av San Jose Av Neighborhood Greenway (Class IIIB) 0.07 $38,047 Medium City of Alameda 135 Waterton St Mound St Court St Neighborhood Greenway (Class IIIB) 0.06 $30,818 Low City of Alameda 65CS Webster St Central Av Atlantic Av Separated Bike Lane (Class IV) 0.57 $414,115 High City of Alameda 97 Westline Dr Otis Dr Eighth St Separated Bike Lane (Class IV) 0.05 $36,951 Medium City of Alameda 121 Whitehall Pl Whitehall Rd Willow St Neighborhood Greenway (Class IIIB) 0.06 $34,559 Medium City of Alameda 23 Willie Stargell Av Main St Fifth St Shared Use Path (Class I) 0.54 $2,485,512 Medium City of Alameda 124 Willow St Shoreline Dr Otis Dr Separated Bike Lane (Class IV) 0.32 $231,580 Medium City of Alameda 112 Willow St Clinton Av Otis Dr Separated Bike Lane (Class IV) 0.17 $120,416 Low City of Alameda 53 Wood St Pacific Av Wood St - Jean Sweeney
Park Connection
Bike Route (Class III) 0.18 $3,655 Low City of Alameda 45 Wood St - Jean Sweeney
Park Connection
Shared Use Path (Class I) 0.08 $351,083 Low City of Alameda 117 Yorkshire Pl Whitehall Pl/Yorkshire Rd Camden Rd/Whitehall Pl Neighborhood Greenway (Class IIIB) 0.05 $26,956 Medium City of Alameda TOTAL 63.06 $65,267,900
Table Notes:
* These projects are already planned for construction.
** Proposed Bikeway Type was changed after Prioritization was completed. + These projects will be built by private developers.

CS These projects align with the highest ranking street segments identified in the pedestrian network prioritization process, and therefore have Complete Streets potential.

Cost estimates: The costs listed are high-l evel estimates, and actual construction costs will vary based on local conditions. The Cost Estimates section and Table 6: Bikeway Cost Estimates, provide a detailed explanation of how estimates were derived, and serve as the basis for these total estimated costs.

Alameda Active Transportation Plan Active Transportation Project List | 20

TRAIL NETWORK PRIORITIZATIO N
All of the proposed off-street trail projects included in Chapter 6: Trails Network and Water Crossings in the Alameda ATP were ranked, using the bicycle network criteria shown in Table 3. The ranking results are mapped in Figure 2, with the other proposed bikeway projects. The trail projects are listed in Table 5, with their Prioritization Rank, estimated cost and lead agency. Note that these projects are also included in Table 4.

These projects are intended to be constructed either as shared-u se paths (Class I) or separate but parallel walking and bicycling paths if there is adequate space and need.

Ta
ble 5. Trail Project List – Prioritization
Project
ID Name Lengt
h (mi)
Prioritizatio
n Rank
(using
bicycle
criteria)
Estimated
Cost
Lead
Agency
22 Posey Tube to Neptune Park
Connection 0.30 Medium Not City Alameda
CTC
23 Willie Stargell Av (Main to Fifth) 0.54 Medium $2,485,512 City of Alameda
84 Park St Bridge 0.13 Medium $592,578 Alameda
County
136 Lincoln Middle School Connection 0.07 Medium $327,119 City of Alameda
2 Estuary Park Pathway 0.05 Medium $250,320 City of
Alameda
31 Neptune Park 0.08 Medium $386,843 City of
Alameda
32 Shoreline Park Connection 0.17 Medium $763,248 City of Alameda
43 Triumph Dr - Jean Sweeney Park
Connection 0.07 Medium $321,489 City of
Alameda
12 Alameda Point Trail 4.71 Medium
$21,690,042 East Bay
Parks/Ot
hers TBD
40 Seaplane North Trail 0.55 Medium $2,548,069 TBD
85 Eighth Street Connector at Washington
Park 0.13 Medium $607,561 City of
Alameda
92 Miller-Sweeney Bridge 0.17 Medium $770,358 Alameda
County
127 Park St to Otis Dr Connector 0.04 Medium $173,778 City of Alameda
141 Towata Park Connection 0.10 Medium $435,630 City of Alameda
45 Wood St - Jean Sweeney Park
Connection 0.08 Low $351,083 City of
Alameda
Alameda Active Transportation Plan Active Transportation Project List | 21 Project
ID Name Lengt
h (mi)
Prioritizatio
n Rank
(using
bicycle
criteria)
Estimated
Cost
Lead
Agency
46 St Charles St - Jean Sweeney Park
Connection 0.08 Low $344,973 City of
Alameda
42 Challenger Dr - Jean Sweeney Park
Connection 0.09 Low $398,136 City of
Alameda
44 Eight Street - Jean Sweeney Park
Connection 0.04 Low $195,030 City of
Alameda
137 Bayview Dr Connection 0.03 Low $146,714 City of
Alameda
140 Bird Sanctuary 0.42 Low $1,922,657 City of
Alameda
163 C St Connection 0.10 Low $450,019 City of
Alameda
159 N Loop Rd Connection 0.06 Low $252,223 City of
Alameda
TOTAL 8 .01 $35,413,382

OVERLAPPING PRIORITIES
Five corridors or street segments were ranked high in both the pedestrian and bicycle prioritization analyzes. These locations would benefit from improvements to both the walking and bicycling networks and are therefore good opportunities for Complete Streets projects. Complete Streets are streets designed to enable safe travel for people traveling by any mode, including people walking, bicycling, riding transit or driving. The locations are:

1. Webster Street from Central Avenue to Atlantic Avenue

2. Oak Street from Buena Vista Avenue to Lincoln Avenue

3. Oak Street from Santa Clara Avenue to Encinal Avenue

4. Park Street from Blanding Avenue to Shoreline Drive

5. Lincoln Avenue from Park St to Oak Street.

COST ESTIMATES
Tables 6 and 7 list the estimated per mile costs to install the types of bicycle facilities and pedestrian treatments included in the ATP. These are high-level estimates, and actual costs will vary based on local conditions. Costs are order-of-magnitude, planning-level estimates based on bid tabulations for recent, similar project types. They include soft costs (engineering, surveying, permitting, project management, and inspection) as well as work required for implementation. Planning-level cost estimates do not take into consideration localized specifics of each project such as right-of-way acquisition, significant utility Alameda Active Transportation Plan Active Transportation Project List | 22 relocation, etc. They are useful for aggregate-level budget planning, but individual project costs estimates will change as projects advance through further study and design.

These cost estimates will be updated over time to better reflect current cost realities.

T
able 6. Bikeway Cost Estimates
Facility Types Rounded Per-Mile Cost
Shared-Use Path or separate walking and biking facilities (Class I) $4,602,961 Bike Lanes (Class II)
(reconfiguration of total roadway lanes/width) $250,000 Buffered Bike Lanes (Class II)
(reconfiguration of total roadway lanes/width) $330,000 Bike Routes (Class III)
(shared lanes) $20,000
Neighborhood Greenways (Class III)
(shared lanes) $560,000
Separated Bike Lanes (Class IV; One-Way)
(paint/post buffers) $730,000
Separated Bike Lanes (Class IV; Two-Way)
(paint/post buffers)
$430,000
Separated Bike Lanes (Class IV; One-Way)
(curb/landscaping buffers)
$5,650,000
Separated Bike Lanes (Class IV; Two-Way)
(curb/landscaping buffers)
$3,260,000
Table 7. Pedestrian Treatment Cost Estimates
Treatment Cost Estimate Unit
Crossing Treatments
Curb extension
$20,200 (concrete) Per curb extension
>$1,000 (quick build)7 Per corner
Median refuge island $ 10,000 Each
7 Assumes 10 bollards, 5 armadillos, 10 gallons of paint, and miscellaneous materials for installation Alameda Active Transportation Plan Active Transportation Project List | 23 Treatment Cost Estimate Unit
In-street pedestrian crossing sign (paddle sign) $30 Per sign Mid-block crossing Varies depending on context – could include crosswalk striping, signs, and/or median refuge island
Pedestrian Hybrid Beacon $110,250 Per unit
Rectangular Rapid Flashing Beacon $ 28,000 Per unit
High-visibility crosswalk marking (i.e., ladder-
or continental-style markings) $8 Per sq ft
Raised crossing $ 4,500 Each
Crosswalk visibility enhancements (advance
yield lines, pedestrian yield sign) Varies depending on context Truck aprons on bulb outs S ite specific Site specific
Parking prohibition near intersection (paint) $2,000 Per intersection Pedestrian signal and leading pedestrian
interval (LPI) $
2,750 Each (LPI)
Pedestrian scramble Site specific Not applicable
Corridor Treatments
Street lighting $20,000, varies Per spot
improvement
Sidewalks $ 25 Per sq ft
Vertical traffic calming (e.g., speed humps and
cushions) $10,000 Per speed hump
Horizontal traffic calming
$3550 (chicane) E ach
$20,000 (neckdown) Each
Neighborhood traffic circle
$25,300 Each
$2,500 (quick build)8 Each
Lower Speed Limits (20 mph or 15 mph) $25 Per sign
8 Assumes 25’ traffic circle diameter, two gallons of paint, one tree, four traffic signs, and 10 dura curbs for an 80’ circumf erence.

Alameda Active Transportation Plan Active Transportation Project List | 24 Treatment Cost Estimate Unit
Road Diet (4 lanes to 3 or 2) $30,000 Varies
Partial traffic diverters (limiting through and
left turns) $
3,900 Each
Streetscape Improvements
Trees/Planter strip $ 1,000 per tree Per unit
Green Infrastructure (e.g., bio-retention areas) $55 Per square foot Bus stop amenities (e.g., benches and shelters)
$700 (bench) Each
$26,000 (shelter) Each
$700 (trash receptable) Each
Bus bulb-outs (concrete) $66,000 Per bulb-out
Street furniture (e.g., benches, art, water
fountains, and recycling bins)
$700 (bench)
$800 (trash bin)
O
ther furniture varies/site
specific
Per unit
Pedestrian-scale lighting $3,000 Per unit
Above-ground planters and potted plants $100 Per sq yard (2’ wide) Pedestrian-oriented wayfinding $500 Per sign and post