Proposed Master Site PlanProposed Master Site Plan
Lafayette St
Chestnut St
Stanford St
Willow St
Schiller St
Union St
Minturn St
Alameda Marina Dr
Clement Ave
Grand St
WIDER BAY TRAIL
• Bay Trail width along the dry boat
storage area increased from 5’ to 14’
to 16’ clear to ensure better access
and flow along the trail.
BAY TRAIL
CONTINUATION
• Bay Trail now continues
to the eastern end of the
site, in the event that a
future connection can be
established through the
Navy Operational Support
Center (NOSC) site.
• Until the connection through
NOSC can be established,
the Bay Trail will continue
out to Clement Avenue
from the southern end of
Waterlife Park.
100’ SHORELINE BAND
• 20 buildings set at least partially within the 100’
Shoreline Band; these buildings are setback on average
10’ from open space areas and the Bay Trail to provide
a transition zone betwen public and private realms.
• The setback transition zone areas will be appropriately landscaped and/or contain site elements that will help
delineate between public and private realms.
BAY TRAIL RELOCATED
• Bay Trail moved to the north side of Harbor View
Park for better connection to waterfront and to
maximize shoreline edge experience.
BOAT HOIST
• Boat hoist use will require a security
credential (card-key or fob). When the
boat hoist is in operation, the Bay Trail
will be temporarily blocked off from
through access to ensure public safety.
• See page 27 for more detailed
information on boat hoist operation and
Bay Trail public access inteface.
PUBLIC ACCESS &
BUILDING INTERFACE
• The project proposes 7 public access
points from Clement Avenue into the
project site to the waterfront; increasing
the porosity of the site from its existing
condition which is walled off.
• Where buildings front onto the Clement
Avenue frontage, as well as at street
frontages and public spaces within
the site, landscape transitions will be
provided to create a clear delineation
between public and private realms.
SEA LEVEL
RISE
• The project will be designed
such that proposed public
access areas, streets, and
building sites will be raised to
a minimum elevation of 13.5,
providing built-in protection
from over 6 feet of future sea
level rise above King Tides.
• The project is designed
with adaptive capacity
to accomodate future
adaptive measures along
the shoreline to provide
protection from further
extreme amounts of sea level
rise.
• Please see the Sea Level
Risk Assessment Strategy
for more detailed information.
Interim
Bay Trail
ALAMEDA MARINA
Parks & Recreations
January 10, 2019 Page: 4
Project Summary
• 760 Dwelling Units; 104 du affordable
• Up to 250,000 sf in
Maritime and Commercial Core
• +/- 20.55 ac in Total Open Space
+/- 3.45 ac on land/wharf
+/-1 7.10 ac in water
• +250 Employed on Site
• Approx. 1,932 Residents
0ft 80ft
N
Legend
Shoreline Edge
100’ Shoreline Band
Security Fence
Boat Hoist
Marina Restrooms
Open Space Park
Open Space Promenade
Open Space Water
Proposed Bay Trail
• Public restrooms, open
during business hours.
• Public restrooms, open during
business hours. Covered outdoor
shower.
WHARF PROMENADE PERSPECTIVE
HARBOR VIEW PARK PERSPECTIVE
WATERLIFE PARK PERSPECTIVE