EXHIBIT 2
DE-PAVE PARK CONCEPTUAL PLAN OPTION 1
SEASONAL BAY TRAIL
CONNECTION FUTURE LEVEE
FUTURE STORM
WILDLIFE OBSERVATION BUILDING WATER BASIN BUILDINGS
25 SALINA
RESTROOM
LEARNING LAB &
GATHEK SPACE
PROMENADE WALKING / BIKING MONARCH ST
BOULDER TIDE:
FOOLS EDUCATO
OVERLOOK
GRAVEL HABITAT
BEACH
EEL GRASS KAYAK / SUP LAUNCH
TRIAL SEAPLANE LAGOON PROMENADI
FUTURE PHASE
SITE PLAN CONCEPT1
De-Pave Park - Concept 1: This concept keeps Building 25 and prioritizes nature and diverse shoreline, while maintaining space for people. • Nature Priority • Pedestrian/bike trails • Observation overlooks • Wetlands and habitat • Bird watching • Education and programs • Picnic areas • Beach • Restroom, and parking • Fishing • Discovery • Boulder tide pools • Nature Play • Lots of seating LEVEE ALIGNMENT
PRIORITIZE NATURE
CONCEPT 1 -AERIAL VIEW UCATION OVERLOOK SPACE FOR PEOPLE CITY OF cing
COMMUNITY MEETING #2 - FALL 2023 ENGEO RMA
ALAMEDA
DE-PAVE PARK CONCEPTUAL PLAN OPTION 2
SHASONAL RAY TRAIL
CONNECTION FUTURE LEVEE
FUTURE STORM
WILDLIFE OBSERVATION BUILDING WATER BASIN BUILDINGS
OVERECO
SALINA
RESTROOM
PEEAKNING LAB &
GAIHEK SPACE
PROMENADE WALKING/BIKING MONARCH ST
BOULDER TIDE.
FOOLS EDUCATIO
OVERLOOK DE-PAVE SITE
"GRAVEL HABITAT
BEACH
EEL GRASS KAYAK/ SUP LAUNCH SEAPLANE LAGOON PROMENADE
TRIAL
FUTURE PHASE
SITE PLAN CONCEPT2
De-Pave Park - Concept 2: This concept keeps Building 25 and expands people space while maintaining majority of nature. • Expanded people space • Pedestrian/bike trails • Observation overlooks • Nature play • Bird watching • Education and programs • Picnic areas • Beach • Restroom, and parking • Fishing • Discovery play • Boulder tide pools • Wetlands and habitat • Lots of seating LEVEE ALIGNMENT
MINIMUM NATURE
CONCEPT 2 - AERIAL VIEW
CITY OF cing rESA
COMMUNITY MEETING #2 - FALL 2023 ENGEO RMA
ALAMEDA
DE-PAVE PARK CONCEPTUAL PLAN OPTION 3
SEASONAL BAY TRAIL FUTURE LEVEE
CONNECTION
CALINA FUTURE STORM
WILDLIFE OBSERVATION WATER BASIN BUILDINGS
SALINA
PARKING
8 +33
E. RESTROOM
EEAKNING LAB &
GA HEKSPACE
PROMENADE WALKING/BIKING MONARCH ST
BOULDER TIDE.
FOOLS EDUCATO
OVERLOOK DE-PAVE SITE
GRAVEL HABITAT
BEACH
EEL GRASS KAYAK / SUP LAUNCH SEAPLANE LAGOON PROMENADE
TRIAL
FUTURE PHASE
SITE PLAN CONCEPT 3
De-Pave Park - Concept 3: This concept removes Building 25, maximizing nature, while maintaining people space. • Maximum Nature • Observation overlooks • Nature play • Bird watching • Education and programs • Picnic areas • Beach • Restroom, and parking • Pedestrian/bike trails • Fishing • Discovery play • Boulder tide pools • Wetlands and habitat • Lots of seating LEVEE ALIGNMENT
MAXIMIZE NATURE
CONCEPT 3 - AERIAL VIEW SPACE FOR PEOPLE
CITY OF cing
COMMUNITY MEETING #2 - FALL 2023 ENGEO RMA
ALAMEDA
DE-PAVE PARK ENHANCED BY SEA LEVEL RISE
SEASONAL BAY TRAIL
CONNECTION
FUTURE STORM
WATER BASIN
MONARCH ST
EDUCATION
DE-PAVE PARK (OPENING DAY)
SEASONAL EAY TRAIL
CONNECTION
FUTURE STORM
WAIEK BASIN
RESTROOM
MONARCH ST
EDUCATION
OVEKLOOK
SEAPLANE LAGOON PROMENADI
DE-PAVE PARK (SEA LEVEL RISE)
Addressing the challenge of sea level rise, the wetlands are susceptible to inundation, while levee serves as a protective barrier safeguarding structures against flooding.
CITY OF cing
COMMUNITY MEETING #2 - FALL 2023 ENGEO RMA
ALAMEDA
DE-PAVE PARK NATURE / HABITAT CREATION
RESTROOM
MONARCH ST
SEAPLANE LAGOONPROMENADE
FUTURE PHASE
NATURE & ECOLOGY - ALL CONCEPTS
BOULDER TIDE POOLS SALINAS GRAVEL BEACH UPLAND MARSH CHANNELS AND PLANE BEACH LOWER GRADES TO 0'-1' LOWER GRADES TO O'-1' LOWER GRADES ATSHORELINE TO 0' ELEVATED RADES FROM 4'- 8' IST - 3RD ORDER CHANNELS -2' - 0' NATURAL SEDIMENT DEPOSIT 0' - 4' REUSE BOULDER SHORELINE 8:1 SLOPE GRAVEL. SIZE TBD MARSH PLANE - O' 1' CITY OF cing rESA
COMMUNITY MEETING #2 - FALL 2023 ENGEO RMA
ALAMEDA