OAAC Adapt Projects
January 2025
Oakland Alameda Adaptation Committee (OAAC):

A coalition of shoreline communities, agencies and stakeholders working to coordinate the Oakland Alameda sub-region flood and adaptation projects to protect and restore water quality, habitat, equity, transportation and community resilience.

Agency Partners
OAAC Adapt: Project Partners
Community Partners Consultants

OAAC ADAPT Projects
• The Subregional Adaptation Plan is a
long-term plan that details preliminary
strategies and pathways for shoreline
communities to take as the climate and
shorelines change over time
• The Oakland Alameda Estuary Project
is a near-term sea level rise adaptation
design concept to address increased
coastal, stormwater, and groundwater
flooding for up to two feet of sea level
rise over the coming decades
• The Bay Farm Island Adaptation
Project is a near-term sea level rise
adaptation design project to address
compound flooding and up to two feet of
sea level rise and long-term planning
coordination.

Sea Level Rise Project Criteria
Near Term Long Term
2060 - 2080
35 to 50-year adaptation project lifespan
2' of sea level rise
Protect to elevation +14’
2100+
Build upon near term projects

3.5 - 7' of sea level rise
Protect to elevation +17’
Precipitation
Sea level rise and
coastal flooding
Rising groundwater
Combined Adaptation:

Shoreline = seawalls, levees and
redevelopment at higher elevations
Inland = green and grey
detention basins
Potential Adaptation Measures
Levee and Seawall
with Bay Trail
Levee with Tidal
Marsh
Pump StationsGreen detention basin
Levee with Beach
Access
Levee with
Waterfront Park
Seawall with
Tidal Marsh
Oakland-Alameda Estuary Near-Term
Adaptation Project

Project Area:

Oakland-Alameda Estuary
+7.5
<7.5
<10.0
+9.0
+10.5
+12.0
+10.0 +9.0 +10.5
+12.0
Posey Tube
Entrance
<6.0
Webster Tube
Entrance
<6.0

MARINA VILLAGE PKWY
<7.0
Shoreline Analysis: Alameda
+10.5
+9.0
+13.5
+10.5
+12.0
<6.0
+7.5

EXTENDED

STAY AMERICA
FFE +12.5

OAKMONT
FFE +10.5

SHIPWAYS

BOHOL CIRCLE

IMMIGRANT
PARK

SHORELINE
PARK

BARNHILL MARINA

FLOATING HOMES

CARDINAL
POINT

MARINER
SQUARE

MARINA VILLAGE
Shoreline Analysis: Oakland
<8.0
<8.0

EMBARCADERO WEST
Estuary Park
Proposed
+12.5

9.0 +
+10.0
+10.010.0+
+10.5
OAK ST

HARRISON ST

WEBSTER ST

BROADWAY

ALICE ST

JACKSNO ST

MADISON ST

FRANKLIN ST

CLAY ST

JEFFERSON ST

FALLON ST

WATER ST

9.0+

9.0+
+11.5
+10.5
+11.0
+11.0 11.0++11.0
<10.0+ +11.0
+10.0

10.0+
+10.5
+10.5
KTVU

RESIDENTIAL
FFE +10.5
<8.0
+10.0

WASHINGTON ST

ALAMEDA

BOHOL CIRCLE IMMIGRANT PARK - SHIPWAYS

EXTENDED STAY

AMERICA
FFE +12.5

BARNHILL MARINA

FLOATING HOMES

OAKMONT
FFE +10.5

BOHOL CIRCLE

IMMIGRANT
PARK
+10.5

MARINER SQUARE DR

TURNING
BASIN
+7.5
+12.0

POSEY TUBE

ENTRANCE

WEBSTER TUBE

ENTRANCE
Levee at
Elevation

14.0 +10.5
+10.5
+7.5
+12.0
+9.0
+10.5
FFE
+13.5
Seawall at
Elevation

14.0 MARINER SQUARE
Near-Term Adaptation Concept
Bohol Circle Immigrant Park to Shipways

OAKLAND ALAMEDA ESTUARY
Seawall at
Elevation 14.0
Raised Pathway
(with landside
retaining wall)
Levee at
Elevation 14.0
Landside Public
Realm Improvements

COLLEGE OF

ALAMEDA
DOCK Q

SHIPWAYS

MARINA VILLAGE

YACHT HARBOUR
+12.0
+9.0
+10.5
+10.5
+12.0

RESEARCH
PARK
FFE+12.0 +10.5
+12.0
Levee - Tie into
Elevation 12.0
high ground at
Shoreline Park
+12.0
+9.0
+10.0

SHORELINE
PARK

RESIDENTIAL

EXTENDED

STAY AMERICA

OAKLAND ALAMEDA ESTUARY
Near-Term Adaptation Concept
Shipways to Marina Village
Shipways new
development – fill to

14.0 Levee at
Elevation 14.0
Landside Public
Realm
ImprovementsRedevelop - fill
to 14.0
Upland Levee at 14.0
Marsh Terrace &
Gravel Beach Below

ALAMEDA

SHIPWAYS TO MARINA VILLAGE
Alameda Shoreline – Near Term Adaptation
Elevated Seawall
Build new Seawall water side
of existing wall.

Environmental permits and
agency coordination required.

Existing +10.5
Proposed +14.0
Existing Elevations at Mariner Square
Section 1 – Typical condition at
Cardinal Point and Mariner Square Drive
Levee elevated to +14.0.

Over 6 feet tall relative to
adjacent grade.

12.0 (+2’ Sea Level Rise)

6.37 MHHW
Alameda Shoreline – Near Term Adaptation
Shoreline Levee
Existing elevation
+7.5 is below
today’s King Tide
Section 2 – Typical condition at Barnhill Marina
Alameda Shoreline – Near Term Adaptation
Existing Shoreline (elev. 10.5)

6.37 MHHW

12.0 (+2’-0” SLR)
+14.0

SLOPE ENHANCEMENT & PLANTING FOR ROCK AND

LOG INTERTIDAL HABITATPICNIC AREA UPLAND HABITAT

PLANTING

LEVEE & IMPROVED

BAY TRAIL
View of shoreline protection and improvements near hotel Proposed fill to
elevate grade at
shoreline and
inland Add space for
habitat on
water side
Alameda Shoreline – Near Term Adaptation
Raised Grade at Shoreline and Inland
Section 4 – Typical condition at Marina Village
• System is designed for 10-year storm
• Volume of water that does not fit in storm
drain system after 100 yr, 24-hr storm:

36.6 acre-feet
• Analysis includes stormwater detention for
today's volume with added capacity for
future increases
Inland Flooding Analysis
Stormwater Modeling: Northside of Alameda
Estimated Future Precipitation %
Increase With Climate Change
San Francisco Bay Area Domain SSP5-8.5
Potential Inland Detention Basin Locations
• Basins store more water
• Storm drains pump water to
bay at low tides within 72 hours
• Most polluted street runoff
heads to storm drain system
Alameda Inland – Detention
Basin Concept Plans
Alameda #2 & #3

WEBSTER ST

MARINA VILLAGE PKWY
Ground Level
+7.24
+9.0

EXISTING SIDEWALK
6 8
Bubble Up
+6.8
Invert
+2.5
Ground Level +7.29
Invert Elevation
+2.03
6 5

NEW WALK CONNECT

TO POSEY TUBE PATH
TYNAN

Bay Farm Island Adaptation Project

BFI Project: Current Flood Conditions

BFI Project: Near-Term Project Area

NORTHERN SHORELINE LAGOON OUTFALL VETERANS COURT
MARSH

CREATION

NEW PUMP STATION
& OUTFALL

ROCK & WOOD GROINS
& FEEDER BEACHES

ROCK & WOOD GROINS
& FEEDER BEACHES

LEVEE &

BAY TRAIL

BFI Project: Preferred Near-Term Alternative
Nature-Based Solutions Levee & Floodwall & Nature-Based Solutions MARSH

CREATION

NEW PUMP STATION
& OUTFALL

ROCK & WOOD GROINS
& FEEDER BEACHES

ROCK & WOOD GROINS
& FEEDER BEACHES
• Nature-based Solutions
• Levee: Lagoon to Veterans Court
• Lagoon: New tide gate, pump station & gravity pipe
• Marsh expansion
BFI Project: Levee / Bay Trail / Marsh Expansion

BFI Project: Levee, Bay Trail & Nature-Based Solutions
Perspective View of Typical Bay Trail condition

BFI: Pump Station & Tide Gate Replacement
• Interior drainage to comply with FEMA 65.10
• Maintain existing lagoon circulation & stormwater management goals • Clarify Operations & Maintenance responsibilities
• Obtain right-of-way or easements for gravity pipe
PUBLIC

OVERLOOK

BAY TRAIL

BACKFILL
VARIES
BFI Project: Veterans Court Adaptation
• Expands marsh to enhance habitat
• Shortens road to Veterans Park
• Maintains 20-25 parking spaces,
including ADA spaces.
• Does not include wooden
bicycle/pedestrian bridge – analysis
for replacement in near term
BFI Project: Bay Trail Bridge Adaptation Alternatives (Phase 2) Alternative 1
Bridge Relocation Outboard
Alternative 2
Underpass Crossing
Alternative 3
Bridge Over Land
Alternative 4
At Grade Crossing
Photo: San Francisco Chronicle

FEMA BRIC Grant: Near-term Project (Phase 1)
BRIC federal $50M
(90%)
Non-federal $5.5M
(10%)
Total $55.5M
Recommended for
further review by FEMA
Start: 2025?
Construction: 2030
Subregional Adaptation Planning
January 2025
Subregional Adaptation Plan Process
Oct 2023 – Mar 2024
Charting the Course Strategy Development
Apr 2024 – Mar 2025
Public Input &
Strategy Refinement
Plan Completion &
Council Hearings
Apr – Jun 2025 Jul – Sep 2025

OAAC Adapt Projects
January 2025
Learn more:
www.alamedaca.gov/OaklandAlamedaAdaptationCommittee