Lincoln Avenue - Marshall Way -
Pacific Avenue
Corridor Improvement Project
January 2025
Exhibit 2
▪ Promote safety by prioritizing Vision Zero
▪ Improve mobility for all users, including AC Transit buses ▪ Improve pavement for better operations, user experience, & reduced maintenance
▪ Provide flood reduction & landscaping
▪ Reduce greenhouse gas emissions by improving traffic
flow & shifting to walking, bicycling & transit
▪ Comply with City plans & policies
Background: Goals
Alternatives Analysis
& Outreach
(2022-2023)
Design &
Construction of
Immediate Actions
(2023-2024)
Design &
Construction
Ultimate Actions
(2024-2027)
Background: Workflow
▪ Placeholder
Background: Over 3 Miles Long
▪ Placeholder
Background: Significant Pedestrian Corridor
2017 - 2021
• 258 reported crashes from 2017-2021:
− 17 crashes involved pedestrians
− 11 crashes involved cyclists
• Hot spots for bicycle & pedestrian
crashes are near Webster St. & Park St.

Background: 258 Reported Crashes in 5 Years
The roadway can currently accommodate up to
1,600 vehicles per hour in each direction
Background: Capacity > Demand
 Street safety concern
reports
 Two online surveys
 Two workshops
 Two open houses
 Transportation Commission
Very
Dissatisfied
19%
Dissatisfied
32%
Neutral
26%
Satisfied
16%
Very Satisfied
7%
Operations
Very
Dissatisfied
30%
Dissatisfied
35%
Neutral
19%
Satisfied
10%
Very Satisfied
6%
Safety
Background: Input
Immediate
action
Concept: Ultimate Vision
* Potential HAWK location
* *
*
Extend red curb paint
Update signage
Install red curb paint
Add colorized pavement
Install flashing beacons
Install flashing beacons
Concept: Immediate Walnut Street Improvements
Concept: Roundabout at Central Ave. / Main St.

Concept: Lincoln Ave. / Fifth St. Roundabout
Existing conditions Preliminary Concept

Concept: Pedestrian Enhancements
Concept: Left Turns & Traffic Signals

Concept: Academy of Alameda Area Enhancements
Pacific Avenue – Existing
Pacific Avenue – Proposed

Marshall Way – Existing

Marshall Way – Proposed

Lincoln Ave. West of Morton St. - Existing

Lincoln Ave. West of Morton St. – Proposed

Lincoln Ave. East of Morton St. - Existing

Lincoln Ave. East of Morton St. – Proposed

Lincoln Ave. East of Park St. – Existing

Lincoln Ave. East of Park St. – Proposed

Lincoln Avenue - Marshall Way -
Pacific Avenue
Corridor Improvement Project
January 2025