Alameda Point Project Overview & FAQ
● Pacific Fusion Overview
● Alameda Point - Project Overview
● What is fusion?
● Is fusion safe?
● What are the regulatory requirements and permits needed to operate the facility? ● What will the byproducts of this process be, and how will they be controlled, disposed of, and stored?
● How will you assure that nothing is released into the community (storm drains, emissions, etc)?
● How are tritium and deuterium stored and how do you assure safety? ● What are the Demonstration System’s power requirements? How will Alameda Municipal Power (AMP) be affected?
● Are there noise or vibration concerns?
● What benefits does this project bring to Alameda Point?

Pacific F
usion Overview
Pacific Fusion is a company founded in 2023 with the objective to power the world with affordable clean energy.

The company utilizes an approach known as pulsed magnetic inertial fusion, which combines deuterium and tritium atoms to produce helium and release energy.

Here is a brief explanation of how pulsed magnetic fusion works:

● A brief but very large electric current is run across a small metal cylinder (less than half an inch in size) containing fusion fuel.
● The electric current creates a powerful magnetic field that rapidly squeezes the cylinder to reach fusion conditions, releasing large amounts of energy which is then used to generate electricity.
● The process is repeated over and over.

More information about Pacific Fusion can be found at www.pacificfusion.com.

Exhibit 4
1 Alameda Point - Project Overview Pacific Fusion is constructing a one-of-a-kind, state-of-the-art fusion research facility. This facility,

known

as

Pacific

Fusion’s

Demonstration

System,

will

demonstrate

that

it

is

possible

to

g
et

more

fusion

energy

output

than

stored

energy

at

the

input—a

fusion

milestone

known

as

net

facility

gain.

Proving

these

conditions

is

an

essential

milestone

to

building

a

power

plant

and

putting

carbon-free

electricity

on

the

grid.

The Demonstration System is not a power plant; it is a fusion research facility. It will not produce

electricity,

and

it

will

be

“pulsed”

about

once

per

day.

Approximately

250

people

would

be

employed

in

this

facility.

The system is designed to be inherently safe—it uses a highly effective passive water shield to make

sure

neutrons

and

intense

light

resulting

from

fusion

a
re

captured

and

remain

confined

to

a

small

area

at

the

center

of

the

system,

thus

ensuring

no

radiation

can

exit

the

facility.

Render of Pacific Fusion’s Demonstration System
Pacific Fusion 2

The above map shows the portion of Site B on Alameda Point that Pacific Fusion is considering.

Below are some common questions associated with fusion energy and Pacific Fusion’s Demonstration

System.

If

you

have

more

questions

about

this

project,

feel

free

to

reach

out

at
alamedacommunity@pacificfusion.com.

Pacific Fusion 3

What is fusion? Fusion is a process that has powered our sun and the stars for billions of years. It is the process

of

joining

light

atoms

together,

which

is

the

opposite

process

of

fission

(splitting

heavy

atoms).

Harnessing fusion here on Earth could provide limitless, clean, on-demand power to drive prosperity

around

the

world.

But

for

fusion

power

to

be

commercially

viable,

we

need

an

approach

that

combines

established

science,

practical

engineering,

and

affordable

manufacturing.

Is fusion safe?
Fusion is safe. The International Atomic Energy Agency provides an excellent resource for information

regarding

fusion

energy

and

its

operational

considerations.

You

can

read

more
here. A few key points are summarized below:
● Fusion is among the most environmentally friendly sources of energy. ● Its two sources of fuel, deuterium (an isotope of hydrogen) and lithium, are widely available

on

Earth.

Lithium

is

used

to

produce

another

hydrogen

isotope

called

tritium,

which

is

used

in

small

amounts

and

contained

in

a

closed

circuit.

Tritium

is

weakly

radioactive

(a

beta

emitter)

and

has

a

short

half-life.
● Fusion systems are inherently safe; they cannot “run away” or melt down. ● Fusion does not create any long-lived radioactive waste.

What are the regulatory requirements and permits needed to operate the facility? Pacific Fusion’s Demonstration System is a fusion research device; it is not a power plant. The system

is

designed

to

be

inherently

safe—it

uses

a

highly

effective

passive

water

shield

to

make

sure

neutrons

and

intense

light

resulting

from

fusion

a
re

captured

and

remain

confined

to

a

small

area

at

the

center

of

the

system,

thus

ensuring

no

radiation

can

exit

the

facility.

There are two key components of permitting for this R&D facility: ● Standard permitting and zoning, which is required in Alameda for any large scale research or manufacturing facility, and ● Licensing from the State of California Department of Public Health to possess small quantities of radiological material (tritium). A similar license would be obtained by universities

or

research

facilities

that

conduct

scientific

or

biomedical

research.

○ Note: The Department of Energy controls the production of tritium for use in fusion research facilities, such as the National Ignition Facility in Livermore, CA and the Z Facility in Albuquerque, NM.

Pacific Fusion 4

Beginning in 2029, Pacific Fusion’s Demonstration System will use small quantities of tritium (approximately

the

amount

found

in

standard

self-luminous

exit

signs)

in

a

closed

circuit

(a

closed

processing

loop

with

no

venting).

This

use

case

will

be

licensed

with

the

state.

The

licensing

process

requires

a

validated

plan

for

safe

operations,

material

storage,

byproduct

waste

management,

and

system

decommissioning.

The

licensing

process

also

includes

ensuring

safe

operations

with

tritium,

which

includes

monitoring

radiation

produced

during

the

fusion

process.

What will the byproducts of this process be, and how will they be controlled, disposed

of,

and

stored?
The Radiological Health Branch of the State of California Department of Public Health controls all aspects of operations of Pacific Fusion’s facility. This includes any byproduct materials as a result

of

fusion

research

at

the

Demonstration

System.

Small

quantities

of

low-level

radiological

waste

byproducts,

such

as

metal

debris

that

has

been

activated,

will

be

stored

temporarily

onsite

and

disposed

of

through

registered

radiological

waste

brokers

as

part

of

the

state-regulated

waste

management

program,

similar

to

university

and

medical

facilities

that

use

radiological

materials.

Tritium

is

processed

in

a

closed

loop

and

reused.

How will you assure that nothing is released into the community (storm drains, emissions,

etc)?
There are no pathways to releasing radiological materials into the community. Tritium systems are

closed

loop,

and

byproduct

materials,

such

as

metal

debris,

are

confined

and

stored

on

site

using

state-approved

containers

and

removed

using

waste

management

processes.

How are tritium and deuterium stored and how do you assure safety? Deuterium and tritium are stored in gaseous form.

Deuterium is procured from local gas suppliers and does not have any special handling requirements.

Tritium will not be used in Pacific Fusion’s Demonstration System until 2029. Tritium is provided
1 by

the

Department

of

Energy

in

approved

transportation

containers.

It

is

stored

as

a

gas

in

containers

in

licensed

glove

boxes

and

is

continuously

monitored.

Tritium

inventory

is

1 Tritium production is controlled by the Department of Energy. Pacific Fusion will begin working with DOE

regarding

sourcing

tritium

to

ensure

it

is

made

available

for

operations

in

2029.

Pacific Fusion 5

closely monitored and regularly reported, consistent with the requirements of the radiological licensing

process.

What are the Demonstration System’s power requirements? How will Alameda Municipal

Power

(AMP)

be

affected?

This facility will be a fusion research facility, not a power plant.

The facility will require roughly 3.3 megawatts (“MW”) of power at peak with an average power draw

most

of

the

time

at

about

half

that

level,

making

it

a

relatively

small

user

of

power

provided

from

AMP.

Are there noise or vibration concerns? There are no mechanisms to produce noise or vibration during daily operations.

What benefits does this project bring to Alameda Point? This project represents a billion-dollar capital investment in Alameda Point, revitalizing largely vacant

land

designated

for

commercial

and

light

industrial

development.

It

will

directly

create

250

jobs

in

Alameda

and

bring
hundreds more jobs to the region.

In addition, Pacific Fusion’s investment in foundational infrastructure would lower the barrier to entry

for

new

businesses

at

Alameda

Point.

This,

in

turn,

would

bring

more

jobs

to

the

community

and

further

increase

professional

and

educational

opportunities

for

local

residents,

including

younger

generations.

Pacific Fusion 6