I am writing to confirm that City staff consulted with the City Attorney’s Office and confirmed that this project is fully compliant with CEQA and qualifies for the CEQA categorical exemptions cited in the staff report (CEQA Guidelines Sections 15301 [Existing Facilities] and 15302 [Replacement or Reconstruction]). The Existing Facilities exemption applies because the project involves replacement of storage tanks at specified existing sites where storage tanks already exist. Similarly, the Replacement or Reconstruction exemption applies because the new structures will be located on the same sites as the original tanks and have substantially the same purposes and capacities. The proposed work will also not involve a significant expansion of existing tank capacities or other material change in use or capacity. The two cited CEQA exemptions are routinely used by public entities for work of this type. Additionally, we have confirmed that the “exceptions to the exemptions” set forth in CEQA Guidelines Section 15300.2 do not apply to this project, and Ms.
Sheehan has not provided any evidence to the contrary.
As outlined in the staff report, the project scope includes the in-place abandonment of three single- wall, fiberglass underground storage tanks (USTs) at the City’s Maintenance Service Center. These will be replaced with a new aboveground storage tank (AST) and associated fueling equipment, designed to meet current regulatory standards. Additionally, the single-wall fiberglass UST at the Police Department—used to fuel the backup generator—will be removed and replaced. The approach at each site differs due to specific site constraints. However, in both cases, the new tanks will match the existing tank capacities.
City staff have been coordinating with the appropriate regulatory agencies since early this year. The Alameda County Department of Environmental Health, acting as the Certified Unified Program Agency (CUPA), is the lead permitting entity for UST-related work. Staff have initiated the CUPA permitting process and advanced it to the point where the City’s contractor must now prepare and submit a detailed work plan for each site. This is a requirement outlined in the project specifications.
The specifications further stipulate that no work may begin until permits are finalized. The contractor is also responsible for complying with all permit conditions and for obtaining a Hazardous Waste Tank Closure Certification, which includes conducting soil testing around the existing USTs.
In addition to CUPA permits, staff have initiated the permitting process with the City’s Building and Fire Departments. These permits are contingent upon CUPA approval, which again requires the contractor’s participation in developing site-specific work plans.
Furthermore, the new aboveground storage tank at the Maintenance Service Center requires a permit from the Bay Area Air Quality Management District. That application is in process and will be completed prior to the start of work.
I am confident that the project is being managed in full compliance with all applicable regulatory and permitting requirements.
Please also note that the new AST at the Maintenance Service Center and the replacement UST at the Police Department will both be double-walled and equipped with continuous leak detection systems. These improvements represent a significant upgrade over the current infrastructure.
Importantly, this aligns with Health and Safety Code §25292.05, which mandates the permanent closure of single-walled USTs by December 31, 2025. With the new equipment, in the unlikely event of a leak, the product would be contained in the annular space between the two tank walls, preventing it from seeping into surrounding soil. A pressure differential would trigger the leak detection system, alerting staff to the issue so repairs can be made promptly.
Please let me know if you have any questions or would like additional information.
Thanks,
Jen
From: Lara Weisiger <[email protected]
>
Sent: Monday, July 14, 2025 12:05 PM
To: CITYCOUNCIL-List <[email protected]>
Cc: Laura Pate <[email protected]>; Erin Smith
<[email protected]>
Subject: FW: [EXTERNAL] Public Comment for 5M 07/15/25: Yet another illegal CEQA Exemption--this time for hazardous waste. Consent 5M #2025-5160 – UST Closure Project
Forwarding 5-M correspondence, which will be attached to the agenda item.
From: Shelby S <[email protected]
>
Sent: Monday, July 14, 2025 11:53 AM
To: City Clerk <[email protected]>
Subject: [EXTERNAL] Public Comment for 5M 07/15/25: Yet another illegal CEQA Exemption--this time for hazardous waste. Consent 5M #2025-5160 – UST Closure Project
**Please add to public comment on the agenda item**
Dear City Councilmembers:
This comment concerns Consent Calendar Item
#2025‑5160, which asserts an improper and
undocumented CEQA exemption for a $2.27 million
hazardous materials project that is subject to
extensive regulation and multiple permitting
requirements under CEQA, RCRA Subtitle I, Health &
Safety Code § 25292.05, and Title 23 of the California
Code of Regulations.
The proposal includes:
Closure and abandonment of three underground
fuel storage tanks (USTs);
Excavation and replacement of a 6,000‑gallon
diesel UST;
Installation of new fuel system infrastructure and
related site work;
Construction activity at the Maintenance Service
Center and Alameda Police Department.
Despite this scope, the project is being treated as
exempt from CEQA under Guidelines §§ 15301 and
15302, which apply only to minor alterations and
replacement of existing structures. These exemptions
are expressly inapplicable to hazardous materials
projects under § 15300.2(a). No environmental review
has been performed, no permits have been issued, and
no documentation has been disclosed to justify
exemption or compliance.
This item presents significant legal and procedural
deficiencies that obscure the project’s true scope,
regulatory posture, and readiness. The problems
include:
1. The project is framed to obscure its regulatory
status and exceptional nature.
The framing of this item—shaped by the City
Manager’s office and the authorship of the summary
report—presents a version of the project that conceals
unresolved permitting obligations and downplays the
exceptional nature of the proposed action. The result is a decision‑making environment in which critical
regulatory steps appear settled when they are not, and
an extraordinary project is treated as routine.
Proceeding under this framing distorts the basis for
decision‑making and undermines the Council’s
legislative authority.
2. The staff report asserts an inapplicable
exemption under CEQA.
The cited exemptions (Guidelines §§ 15301 and
15302) apply only to minor alterations or replacement
of existing structures and do not apply to hazardous
materials projects, which are specifically excluded
under § 15300.2(a). The City’s assertion of these
exemptions is unfounded and unsupported by the
project’s scope or record.
3. The project lacks required documentation for
environmental compliance.
A project involving hazardous materials and USTs
requires:
Phase I or II Environmental Site Assessments;
Soil or groundwater testing data;
UST closure or removal permits;
CEQA Initial Study, Negative Declaration, or
equivalent;
Records of communication with regulatory
agencies.
None of this documentation has been provided.
4. The project description is inconsistent with the
executed contract.
The summary report claims that regulatory approvals
have already been obtained, while the construction
contract explicitly requires the contractor to secure all permits prior to work. This inconsistency leaves it
unclear what is actually being approved, and
misrepresents the legal posture of the project.
5. Abandonment-in-place is an extraordinary
remedy that has not been justified.
Under CCR Title 23 § 2672, abandonment‑in‑place
may only be approved if physical removal is infeasible.
This determination must be supported by structural
analysis and agency approval—neither of which has
been provided. The summary report treats
abandonment‑in‑place as presumptively authorized.
6. The regulatory deadline is used to
manufacture false urgency.
Health & Safety Code § 25292.05 sets a deadline of
December 31, 2025 for closure of single‑walled USTs
through proper permitting. The statute does not
eliminate CEQA review or allow premature approval.
The summary’s invocation of this deadline skews
Council’s understanding and pressures expedited
action.
7. Undisclosed Levine Act violations.
The Levine Act (Gov. Code § 84308) requires
disclosure and recusal if any party to the contract
contributed $250 or more to a Councilmember in the
past 12 months. No such disclosures appear in the
record, and no confirmation has been provided that
conflicts do not exist.
8. Councilmembers with conflicts of interest must
recuse themselves.
Councilmember Greg Boller is employed by the
Alameda County District Attorney’s Office, which
has CEQA enforcement authority under PRC §
21167.7.
Councilmember Tony Daysog is employed by
BCDC, the Bay Conservation and Development
Commission, a regional agency with oversight
over shoreline development, hazardous materials,
and public trust resources in the Bay Area. His
position at BCDC places him in direct conflict with
the regulatory posture of this project, especially
given the potential environmental implications
and the unresolved permitting status.
The City Manager, Jennifer Ott, both authored the
staff report and is responsible for enforcing local
environmental compliance. Her dual role as the
architect and approver of the project further
compromises the procedural neutrality of this
item.
Action required:
This item should not be placed on the consent calendar
for the first time. It involves hazardous materials,
unresolved regulatory approvals, and CEQA exemption
claims that lack factual and legal support. The City
must:
1. Remove Item #2025‑5160 from the consent
calendar;
2. Direct staff to disclose all environmental
documentation, permitting status, and agency
correspondence;
3. Require recusal of any Councilmember with a
financial, institutional, or enforcement conflict;
4. Postpone consideration of the contract until CEQA
review is completed and all required permits have
been secured.
Unsurprisingly, this action is yet another example of
the City’s ongoing misconduct—suppressing
documentation, distorting regulatory obligations, and
using CEQA exemptions to bypass lawful oversight.
The pattern reflects a broader failure to uphold
environmental law and administrative integrity and
requires immediate correction by higher authorities.
Submitted for the record.
--
"The righteousness of the oppressed will not go unheard."
From: Shelby S
To: City Clerk
Subject: [EXTERNAL] Public Comment for 5M 07/15/25: Yet another illegal CEQA Exemption--this time for hazardous waste. Consent 5M #2025-5160 – UST Closure Project
Date: Monday, July 14, 2025 11:53:27 AM
**Please add to public comment on the agenda item**
Dear City Councilmembers:
This comment concerns Consent Calendar Item #2025‑5160, which asserts an improper and undocumented CEQA exemption for a $2.27 million hazardous materials project that is subject to extensive regulation and multiple permitting requirements under CEQA, RCRA Subtitle I, Health & Safety Code § 25292.05, and Title 23 of the California Code of Regulations.
The proposal includes:
Closure and abandonment of three underground fuel storage tanks (USTs); Excavation and replacement of a 6,000‑gallon diesel UST; Installation of new fuel system infrastructure and related site work; Construction activity at the Maintenance Service Center and Alameda Police Department.
Despite this scope, the project is being treated as exempt from CEQA under Guidelines §§ 15301 and 15302, which apply only to minor alterations and replacement of existing structures. These exemptions are expressly inapplicable to hazardous materials projects under § 15300.2(a). No environmental review has been performed, no permits have been issued, and no documentation has been disclosed to justify exemption or compliance.
This item presents significant legal and procedural deficiencies that obscure the project’s true scope, regulatory posture, and readiness. The problems include:
1. The project is framed to obscure its regulatory status and exceptional nature.
The framing of this item—shaped by the City Manager’s office and the authorship of the summary report—presents a version of the project that conceals unresolved permitting obligations and downplays the exceptional nature of the proposed action. The result is a decision‑making environment in which critical regulatory steps appear settled when they are not, and an extraordinary project is treated as routine. Proceeding under this framing distorts the basis for decision‑making and undermines the Council’s legislative authority.
2. The staff report asserts an inapplicable exemption under CEQA.
The cited exemptions (Guidelines §§ 15301 and 15302) apply only to minor alterations or replacement of existing structures and do not apply to hazardous materials projects, which are specifically excluded under § 15300.2(a). The City’s assertion of these exemptions is unfounded and unsupported by the project’s scope or record.
3. The project lacks required documentation for environmental compliance.
A project involving hazardous materials and USTs requires:
Phase I or II Environmental Site Assessments;
Soil or groundwater testing data;
UST closure or removal permits;
CEQA Initial Study, Negative Declaration, or equivalent; Records of communication with regulatory agencies.
None of this documentation has been provided.
4. The project description is inconsistent with the executed contract.
The summary report claims that regulatory approvals have already been obtained, while the construction contract explicitly requires the contractor to secure all permits prior to work.
This inconsistency leaves it unclear what is actually being approved, and misrepresents the legal posture of the project.
5. Abandonment-in-place is an extraordinary remedy that has not been justified.
Under CCR Title 23 § 2672, abandonment‑in‑place may only be approved if physical removal is infeasible. This determination must be supported by structural analysis and agency approval—neither of which has been provided. The summary report treats abandonment‑in‑place as presumptively authorized.
6. The regulatory deadline is used to manufacture false urgency.
Health & Safety Code § 25292.05 sets a deadline of December 31, 2025 for closure of single‑walled USTs through proper permitting. The statute does not eliminate CEQA review or allow premature approval. The summary’s invocation of this deadline skews Council’s understanding and pressures expedited action.
7. Undisclosed Levine Act violations.
The Levine Act (Gov. Code § 84308) requires disclosure and recusal if any party to the contract contributed $250 or more to a Councilmember in the past 12 months. No such disclosures appear in the record, and no confirmation has been provided that conflicts do not exist.
8. Councilmembers with conflicts of interest must recuse themselves.
Councilmember Greg Boller is employed by the Alameda County District Attorney’s Office, which has CEQA enforcement authority under PRC § 21167.7.
Councilmember Tony Daysog is employed by BCDC, the Bay Conservation and Development Commission, a regional agency with oversight over shoreline development, hazardous materials, and public trust resources in the Bay Area. His position at BCDC places him in direct conflict with the regulatory posture of this project, especially given the potential environmental implications and the unresolved permitting status.
The City Manager, Jennifer Ott, both authored the staff report and is responsible for enforcing local environmental compliance. Her dual role as the architect and approver of the project further compromises the procedural neutrality of this item.
Action required:
This item should not be placed on the consent calendar for the first time. It involves hazardous materials, unresolved regulatory approvals, and CEQA exemption claims that lack factual and legal support. The City must:
1. Remove Item #2025‑5160 from the consent calendar;
2. Direct staff to disclose all environmental documentation, permitting status, and agency correspondence;
3. Require recusal of any Councilmember with a financial, institutional, or enforcement conflict;
4. Postpone consideration of the contract until CEQA review is completed and all required permits have been secured.
Unsurprisingly, this action is yet another example of the City’s ongoing misconduct— suppressing documentation, distorting regulatory obligations, and using CEQA exemptions to bypass lawful oversight. The pattern reflects a broader failure to uphold environmental law and administrative integrity and requires immediate correction by higher authorities.
Submitted for the record.
--