Project Status:

Dressing rooms complete
Lighting and AV infrastructure complete
Next Steps:

Fire curtain under fabrication
Challenges:

Existing conditions required fire curtain redesign
Long lead times for fire curtain, and hoists for fire curtain and main curtain 1 Measure B
Alameda High School Kofman Stage Upgrades
Estimated Completion Date: Mid-November 2025
Soft Opening for School use only: December 2025
Open for Permitting: June 2026

2 Alameda High School Kofman Stage Upgrades
Completed standard dressing room
Measure B
Completed large dressing room
Completed new accessible toilet room

3 Alameda High School Kofman Stage Upgrades
View of scaffolding at stage
Fire curtain overlap wall extension above stage
Measure B

Project Status:

Under ACEHD oversight, (Impacted Soil Delineation, Dewatering, etc.) Construction activities resumed after cleanup delay
Next Steps:

Under ACEHD oversight, develop a cleanup plan and execute it Challenges:

Impacted soil found during demolition
Testing and Soils Management Plan development to dispose of impacted soil ACEHD oversight: turnaround time and number of deliverables requested Schedule and cost impacts to date
4 Measure B
Alameda High School Swim Center
Estimated Completion Date: June 2026

Alameda High School Swim Center
Measure B
5 Schematic Design
Current State of the Site

Project Status:

Fencing complete
Soccer/football field complete
Lights, sound system, score board complete
Next Steps:

Synthetic Field Turf installation
Challenges:

Delayed project start due to Bay Conservation & Development Commission (BCDC) Coordination with City on Storm Drain relocation
Site being by the bay = Dewatering impacts
6 Encinal Jr/Sr High School Stadium and Field Renovation Measure B
Estimated Completion Date: Mid-November 2025
Soft Opening for School use only: December 2025
Open for Permitting: June 2026

Encinal Jr/Sr High School Stadium and Field Renovation
Measure B
7 Project Status:

Building 100 (Admin/Media Center) and Building 300 (Gym) : Framing walls, electrical rough-in Building 400 (Classrooms): Steel structure
Challenges:

Responding to neighbor questions and complaints
DTSC review
City’s Grand Street improvement projects starting
8 Measure B
Wood Middle School New Construction
Estimated Completion Date: Summer 2026

9 Wood Middle School New Construction - Classrooms
Measure B

Project Status:

DSA reviewing design
Coordinating with City of Alameda
Contractor performing Preliminary Services
Next Steps:

Planning for the move
Challenges:

City Storm Drain Relocation Coordination
Potential prolonged approval process from Department of Toxic Substances Control (DTSC) Potential neighborhood complaints during pile driving
10 Otis Elementary School New Construction
Measure B
Estimated Completion Date: Summer 2028
Otis move to the Temp Campus: June 2026

11 Otis Elementary School New Construction
Conceptual rendering: Ariel View
Measure B
Conceptual rendering: Campus Entry

Project Status:

Board recently approved Schematic Design
Next Steps:

Submit to Division of the State Architect (DSA) this fall Challenges:

Potential extensive dewatering during excavation
12 Encinal Jr/Sr High School New Gymnasium
Measure B
Estimated Completion Date: Fall 2027

13 Encinal Jr/Sr High School New Gymnasium
Conceptual Rendering: View from the Stadium
Rendering: Weight Room w/ View to Stadium
Measure B
Conceptual Rendering: Gym Interior

← All documents from this meeting