SW04-20
(Expires:
3/31/26)
HGACBuy contract pricing worksheet
For MOTOR VEHICLES Only
Contract
No.:
Date
Prepared:
7/31/2025
This Worksheet isprepared by Contractor and given toEnd User. If a PO isissued,both documents MUST be faxed to H-GAC(w 713-993-4548. Therefore please type or print legibly.
TYMCO, Inc. (ISSlT. WO. TO TYMCO. Inc.-Huyitiu
Agency: City ofAlameda, CA Contnictor:
email below)
Contiict
I’erson:
Prc|Ki red Kaye MorganBv:
254-799-5546I’lionc: Phone:
254-799-2722I'lix: I'-Ax:
[email protected]:
Product
TYMCO Model 600 Regenerative Air SweeperB53 Description:Code:
.S 182.070.00A. Product Item Base Unit Price Per Contractor’s H-GAC Contract:
B. Published Options - Itemize below - Attach additionalshect(s)ifnecessary - Include Option Code in descriptionif Description CostDescription Cost
Sweeper Deluge 600013 .S 1.050.00A.O.D. Washdown System 600004 i S 2.050.00 COMDia Paekage 600021 Hopper Drain 600020 S 565.00S 4,900.00 Abrasion ProtectionPackage 600036Gutter Broom TiltAdjuster- Lefl/Right600022 S 1.275.00S 1,700.00 Auxiliar)'IlydraulicSystem 600053Pick-Up 1lead PressureInletWater Injection600060 j S S 1.100.001,830.00 Pick-Up Head CurtainLifter600087 Broom AssistPick-Up Head 600064 S 5.265.00! S 1.605.00 j $ 99.675.00 VariableSpeed GutterBrooms 600070 $ 775.002023 International MV607 Chassis 600713 QlOTi: GOOD FOR 30 l)A\ S
DEUVERY SI BJECT TO TRUCK AVAILABILITY
Subtotal From Additional Sliect(s):
Subtotal B: i $ I2i.790.00
C. Unpublished Options - Itemize below / attach additionalshcet(s)ifnecessary.
Description Description CostCost
Double DUO Skids w/3" Skid Bumper ExtensionsStainless Limb Guard S 2.000.00S 200.00 Auto Sweep Assi.st(ASA) S 2.500.00Dump Switch inCab S 200.00 Uncar Actuator- PressureBleeder w/GaugcilopperSplitScreen S 450.00S 800.00 Cleaning Tool Bracket S 100.00InstallCustomer Water Meter (GCS) S 900.00 2024 International MV607 Chassis UPGRADE
Ineludes:Chrome Bumper.Chromc Grille: (6)
.Aluminum Wheels *l-'orUse in Curb I Slate (CA)
S 18.500.00
Low Ihnission Packaae S 1.500.00
Subtotal C:iS 27.150.00
Check: Totalcostof Unpublished Options (C) cannot exceed 25% of thelota!of the Base Unit Priceplus PublishedOptions (A-t-B). For thistransactionthe percentage is: 9% D. Total Cost Before .Any Applicable Trade-In / Other Allowances / Discounts (A+B+C) i S 331.010.00 Subtotal D: j S 331.010.00Quantity Ordered: X Subtotal of A+B + C: S 331.010,001 F. Trade-Ins / Other Allowances / Special Discounts / Freight/ Installation DescriptionDescription CostCost
Freight/PDl/lnservicc S 11.500.00
Surcharge - Base Sweeper S 9.550.00
CA SalesTax (i0.75%) $ 37.846.45 Subtotal F: j S 58.896.45 G. Total Purchase Price (D+E+F):Deliven' Date: 240 - 300 Days S 389.906.45 EXHIBIT 1