Exhibit 2: Transportation 2025 Annual Report & 2026 Work Plan Draft

Alameda City Council
March 17, 2026

Document
Exhibit 2: Transportation 2025 Annual Report & 2026 Work Plan Draft
Meeting
March 17, 2026
Body
Alameda City Council
Original file
4.0 MB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 1 City of Alameda
Transportation
Plans
202
5 Annual Report &
202
6 Work
Plan
DRAFT
City of Alameda, DRAFT March 17, 2025
Exhibit 2
Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 2

Contents
STATUS REPORT ON TRANSPORTATION 3
Top Accomplishments in 2025 4
What to Look for in 2026 6
2025 Transportation Facts 8
2025 ACCOMPLISHMENTS & 2026 PLAN 10
Citywide Planning Efforts 10
Transportation Programs 10
Public Transportation 13
Capital Project Planning & Design 15
Capital Project Construction 17
Other Agency & Developer-Led Transportation Projects 20 STAFFING, FUNDING, AND GRANT PRIORITIES 21
TRANSPORTATION CAPITAL PROJECTS MAP 23
ALAMEDA VISION ZERO 2025 ANNUAL PERFORMANCE METRICS REPORT 24 ACTIVE TRANSPORTATION PLAN 2025 PERFORMANCE MEASURES REPORT 34

If you need an alternative or translated format of this plan, please contact [email protected]

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 3

STATUS REPORT ON TRANSPORTATION
This report summarizes City of Alameda (City) transportation accomplishments from 2025 and priorities for 2026.

It fulfills General Plan Mobility Element requirements for annual public reviews of the transportation system and serves as a combined annual report for the Active Transportation Plan (2022), Vision Zero Action Plan (2021), and Transportation Choices Plan (2018). It also tracks progress on transportation-related actions in the City Council Strategic Plan (2023). These plans set goals to eliminate traffic deaths and severe injuries; create safe, comfortable, and accessible ways for people of all ages and all abilities to get around Alameda by walking and biking; and reduce solo driving and increase other modes while improving safety, equity, and climate. 202
5 BY THE NUMBERS

1.5 Miles
N
ew
A
ll
A
ges and
A
bilities
B
ikeways

8,184
Sidewalk
T
rip
H
azards
R
epaired

7 9
Intersection Safety
Improvements

125
,
301
Passengers on the Oakland
Alameda Water Shuttle

25 New or
U
pgraded
C
urb
R
amps

2 2
5,
4 67
Rides taken by members of the
Free Bus Pass Program

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 4 TOP ACCOMPLISHMENTS IN 202
5 Constructed
First Neighborhood Greenway on Pacific Avenue
In November 2025, the City completed construction of the first full segment of a Neighborhood Greenway along Pacific Avenue, from Oak to Lafayette Streets. Improvements include speed humps, new stop signs, painted curb extensions, new crosswalk and bikeway markings, and a neighborhood traffic circle at Chestnut Avenue. In 2026, the City will use community input and evaluation of the pilot segment to finalize designs for the Slow Street segments on Versailles Avenue, San Jose Avenue and the remainder of Pacific Avenue, and construct these segments.

Photo by Maurice Ramirez
Launched
Citywide Mobile
Parking Payment
System
The City modernized its parking system by
launching mobile payments at parking meters and
surface lots citywide. The City also started mid-
week paid parking at Harbor Bay Ferry Terminal to
open up parking spaces on the busiest days and
to offset costs for a new security guard. Seaplane
Lagoon Ferry Terminal security and paid parking
began in February 2026.

Repaired Sidewalks at 8,000
Locations
The City’s Sidewalk Repair Program launched a
new effort allowing homeowners to partner with
Public Works to repair sidewalks in front of their
homes. In 2025, the program made repairs at over
8,000 locations, replacing 36,400 square feet of
sidewalk and eliminating 7,600 trip hazards. The
program continues each year to maintain safe and
accessible sidewalks in Alameda.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 5 Held Successful Alameda Bike
Festival
In April 2025, the City held the annual Alameda
Bike Festival, this year at Paden Elementary
School, in partnership with the Alameda County
Safe Routes to School Program. The event drew
hundreds of participants for a fun day of activities
including free bike repairs, helmet fitting and
giveaways, bike rodeo education classes, cargo
and electric bike test rides, food trucks, music and
more. In 2026, the Bike Festival will be held on
May 2 at Ruby Bridges Elementary.

Helmet decorating at the annual Bike Festival

Constructed Alameda’s First Roundabouts on Central Avenue Throughout 2025, the City made major progress on constructing the Central Avenue Safety Project, including roundabouts, bikeways, new crosswalks, roadway reconfigurations, and pavement resurfacing. Thanks to the patience and cooperation from residents and visitors, the project is ahead of schedule and on track for completion in Spring 2026. Two roundabouts are nearly complete as of early 2026, with upgraded lighting to come. When complete, the Central Avenue project will improve safety for all street users and reduce vehicle delays. Roundabouts reduce the types of crashes where people are seriously hurt or killed by up to 78 percent compared to signalized intersections.

Central Avenue under construction in 2025. Photo by Maurice Ramirez.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 6

WHAT TO LOOK FOR IN
202
6 The year ahead will be a busy one for transportation project construction in Alameda. When complete, these projects represent major investment in safety and quality of life for residents and visitors in Alameda. The City recognizes the challenges of detours and lane closures during construction. Find the latest information on traffic changes via up-to-date websites and project email lists. Thank you for your patience as Alameda invests in safer, more sustainable infrastructure.

Completion of The Cross Alameda Trail
The Cross Alameda Trail will be complete by the end of 2026, with the construction of the final two segments at the Clement Avenue Extension (Ohlone Ave to Grand Street) and the Clement Avenue/Tilden Way Project. This premiere cross-town, low-stress four-mile walking and bicycling corridor connecting the island’s east side to the west was first envisioned in the 1991 General Plan. In 2017, the first segment opened on Clement Avenue from Entrance Road to Ohlone Way. Since then, six more segments have been completed including City-led parks, on- street separated bikeways, and segments constructed with new development. Now the full Cross Alameda Trail is on track for completion this year!

Cross Alameda Trail segment under construction
along Clement Avenue. Photo by Maurice Ramirez.

Concept plan for Cross Alameda Trail at Clement
Avenue/Tilden Way Project.

Repaving and Safety
Improvements
Each year, the Pavement Program works to
include safety and multi-modal transportation
improvements with pavement. In 2026, the
program will include the San Jose Avenue
Neighborhood Greenway from San Antonio
Avenue/Morton Street to Oak Street and the
Fernside Boulevard near-term design from Tilden
Way to High Street.

Concept plan for Fernside Boulevard repaving.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 7 New Bike Racks Near
Businesses
Thanks to a Transportation Fund for Clean Air
grant from the Alameda CTC, the City will begin
installing 100 new bike racks in 2026. Racks will be
placed near community destinations and
businesses, focusing on areas with high
community requests such as Alameda’s “station”
business districts along Encinal and Lincoln
Avenues.

Oakland
Alameda Access
Project to Begin Construction
Led by the Alameda CTC and constructed by
Caltrans, the Oakland Alameda Access Project will
make freeway access easier, improve safety in
Oakland Chinatown and Downtown, and add a
new 4-foot pathway for people walking and biking
in the Webster Tube.

Construction is set to begin in spring 2026 and
last approximately 3.5 years. During much of this
time, travelers can expect delays through the
Webster and Posey Tubes, as well as limited tube
closures. The Oakland Alameda Water Shuttle will
operate on Tuesdays and for longer weekend
hours during the Oakland Alameda Access Project
Tube construction periods thanks to funding from
Alameda CTC. To stay updated on construction
status, closures, and reroutes, sign up for Caltrans
project updates.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 8 202
5 TRANSPORTATION FACTS
Traffic Safety
In 2025, 1 person died and 8 people were seriously injured in traffic collisions on Alameda streets. As of 2024, the City’s rate of traffic fatalities + severe injuries per 100,000 population was 65% lower than the rate in Alameda County and 73% lower than the California rate.

In 2025, 1.69 miles of roadway and 79 intersections were upgraded with interventions like speed humps, new
separated bike lanes, traffic signal upgrades, new curb extensions, new/upgraded crosswalk markings, and
intersection daylighting.
70% of Police Department traffic enforcement stops in 2025 were on High Injury Corridors, with officers continuing to prioritize efforts on dangerous streets.

See the Vision Zero Annual Report for detailed information.

Motor Vehicle Trends
Per analysis of weekday travel by the Alameda County
Transportation Commission:
• Average daily vehicle miles traveled (VMT) on Alameda County freeways increased 2.5% from 202 4 to 2025, about 12% above 2019 levels.
• Average daily vehicle hours of severe delay on Alameda County freeways decreased by less than one percent from 2024 to 2025, about 3.5% below 2019 levels.

Pavement Condition
As of the end of 2024, the City’s three-year moving average Pavement Condition Index 0F
1 is 65, which is “fair condition.” This is
close to the Bay Area average of 67. Three-year moving averages are reported in the following year.

Bikeways
Alameda added 2.1 miles of bikeways in 2025, including 1.5 miles of low-stress bikeways and 0.6 miles of new bike lanes. The City now has more than 60 miles of bikeways, including 25 miles of low-stress facilities.

See the Active Transportation Annual Report for detailed information.

1 Three-Year Moving Average Pavement Condition Index Scores by MTC 202
5 OUTREACH EFFORTS
3 public workshops organized by
transportation staff (not including
commissions or City Council)
89 email bulletins sent with 401,698
delivered and a 47% unique email
open rate
74,300 unique page views on 38
webpages
11 Mastick Senior Center events to
help seniors access transportation
options
4 adult bicycle safety education
courses and 4 family bicycling events

TOP 10 WEB
PAGES
WITH
THE

MOST UNIQUE PAGE VIEWS IN
202
5 :
→ Oakland Alameda Water Shuttle
→ Parking Citations & Enforcement
→ Central Avenue Safety Project
→ Ferry Terminal & Transit Parking
→ Parking FAQs
→ Get Around Alameda
→ Park & Webster Street Area
Parking
→ Roundabouts in Alameda
→ Transportation
→ Neighborhood Greenways

COMMUNITY

ENGAGEMENT

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 9 AC Transit Bus Service
Ridership on AC Transit lines serving Alameda dipped slightly in 2025, with 4% fewer boardings on an average weekday during the fall season as compared to 2024.

AC Transit service changes
from the Realign planning
process took effect in
August 2025. The City of
Alameda has been working
closely with AC Transit to
update bus stop
infrastructure at new stop
locations, including for the
newly re-routed Line 19.

Bus pass programs in
Alameda continue to be a
success. Participants of the
City of Alameda’s Free Bus
Pass Program for seniors
and people with disabilities
took 225,467 bus trips in 2025. The 1,725 Alameda TMA Clipper BayPass holders took almost 200,000 transit trips in 2025, about a third of which were on AC Transit. This program replaced the AC Transit EasyPass program for residents and employees in the Alameda TMA.

San Francisco Bay
Ferry Service
In 2025, WETA’s ferry service continued to see growing ridership across its system, with recovery to 88% of 2019 ridership levels. Ferry ridership on the Alameda Seaplane and Harbor Bay routes grew 18% from 2024 with 732,000 boardings on these routes in 2025.

Mastick Senior Center members riding SF Bay Ferry and AC Transit on Alameda Connect travel training trips. 0 1,000
2,000
3,000
4,000
5,000
6,000
7,000
51A 20 21 96 O 19 631 687 W 851 663
Average Number of Riders
Average Weekday Boardings on Lines Serving
Alameda, Fall Season 2021-2025
2021 2022 2023 2024 2025
Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 10 202
5 ACCOMPLISHMENTS & 202
6 PLAN
This report covers citywide efforts largely undertaken by the transportation planners in the Planning, Building, and Transportation Department and engineers in the Public Works Department. It also includes projects led by the Recreation and Parks Department, private developers, and transportation agencies outside of Alameda.

Policy Documents Key:
• S – City Council Strategic Plan (2023)
• CIP – Capital Improvement Plan (2023)
• ATP – Active Transportation Plan (2022)
• VZ – Vision Zero Action Plan (2021)
• TC – Transportation Choices Plan (2018)
• General Plan (2021) items are not marked, though many actions are also included in that plan .

New Project

Complete Project

CITYWIDE PLANNING EFFORTS
Plan Status Report
Vision Zero Action Plan
Technical Update
VZ

2026: Pending funding availability, conduct a 5-year technical update of the Vision Zero Action Plan, update High Injury Corridor maps and in-depth collision analysis based on newer data. The existing High Injury Corridor maps utilize 2009-2018 data.

Information: alamedaca.gov/VisionZero

TRANSPORTATION PROGRAMS
Program Status Report
ADA Self-Evaluation and
Transition Plan
Implementation
S, CIP
2025:
• Continued Sidewalk Maintenance program and other transportation programs in alignment with the ADA Transition Plan.
• Held a roundabout training for blind and low-vision community members in fall 2025.
2026: Continue implementation of the ADA transition plan and accessibility programs.

Information: alamedaca.gov/ADA
Bike Share 2025:
• Advocated for Alameda CTC funding for a bike share program during Oakland Alameda Access Project (OAAP) construction period.
• Met with MTC about bringing BayWheels to Alameda.
2026: Pending funding from Alameda CTC, develop and launch a limited bike share program in the west end by early 2027.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 11 Program Status Report
Legislative agenda

VZ, ATP
2025: Several bills the City of Alameda supported were signed into law in 2025.

This includes Senate Bill 63, which authorizes a regional transportation revenue measure to invest in and sustain public transit services in the San Francisco Bay Area.
2026: Continue legislative agenda.

Information: alamedaca.gov/LegislativeAffairs
Parking & Curb
Management

TC, CIP
2025:
• New security guard service began at Harbor Bay Ferry Terminal in May, and paid parking began in October, including parking occupancy data collection. • Constructed ADA and bus stop improvements in the Harbor Bay Ferry Terminal in September.
• Launched mobile parking payment options citywide at parking meters and pay stations; replaced pay stations on Park Street from Central Ave to San Jose Ave.
• Began constructing Civic Center garage improvements in November. 2026:
• Launch paid parking and new security guard service at Seaplane Lagoon Ferry Terminal in early 2026, including parking occupancy data collection. • Begin collecting parking occupancy data in business districts.. • By summer, complete construction of Civic Center garage security, lighting, paint, bike locker relocation, and technology improvements.

Information: alamedaca.gov/Parking
Pedestrian & Bicyclist
Education

VZ, ATP

2025:
• Successful Bike Festival at Paden Elementary in April. • 4 adult/teen/family bicycle safety education classes in 2025. • Cycles of Change provided bike education at 2 schools, reaching 110 students total.
2026:
• Bike Festival at Ruby Bridges Elementary on May 2, 2026 • Renew contract with Bike East Bay and continue offering adult/teen/family bike safety education classes with a possible reduced scope due to funding constraints.

Information:
alamedabikefestival.org
bikeeastbay.org/education
alamedacountysr2s.org/our-services/plan-an-event/drive-your-bike Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 12 Program Status Report
Transportation
Management
Associations: Alameda
TMA and West Alameda
TDMA
S, TC
2025: All actions listed below are done by the Alameda TMA and West Alameda TDMA, not the City of Alameda.
• 1725 Alameda TMA Clipper BayPass holders took almost 200,000 transit trips. • West Alameda TDMA ended Target-to-BART shuttle and transitioned to AC Transit EasyPasses.
• Restructured transit pass program to ensure fiscal sustainability. 2026:
• Continue monitoring and refining Bay Pass/Easy Pass programs for long term stability.
• Alameda TMA will lead effort to secure funding commitments from West Alameda TDMA, Port of Oakland and Jack London Improvement District for Phase II (years 3 & 4) of Water Shuttle pilot.

Information: alamedatma.org
Vision Zero
VZ
2025: Held two Vision Zero trainings for new police recruits and regular Vision Zero implementation team meetings.
2026: Continue Vision Zero trainings for new police recruits and regular Vision Zero implementation team meetings.

Information: alamedaca.gov/VisionZero
Vision Zero: Fatal Crash
Response program
S, VZ
2025:
• One person died in a traffic collision in 2025, when driver struck a person walking across Ralph Appezzato Memorial Parkway at Poggi St. The City held a multi-departmental post-collision site visit. With signal and crossing improvements installed at this intersection in 2024, the team did not identify remaining quick-build improvements and concluded that more systemic change is needed.
• Flashing beacons and pedestrian crossing improvements at three Mecartney Rd intersections constructed in June, including the site of a 2023 fatal collision. 2026: Continue monitoring and responding to collisions through the Fatal Crash Response Program.

Information: alamedaca.gov/FatalCrashResponse
Speed Hump Guidelines 2025: Developed draft Speed Hump Prioritization Guidelines and presented to Transportation Commission for feedback.
2026: Finalize Speed Hump Prioritization Guidelines and begin prioritization.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 13

PUBLIC TRANSPORTATION
Program Status Report
Alameda CTC Funded
Transit Project (City)

2025:
• City Council and the AC Transit Board approved the request to reprogram $9 million in dedicated funding from Measure BB to support a program of transit-supportive projects on the West End of Alameda. Projects include the Willie Stargell Complete Street Corridor, Lincoln/Marshall/Pacific Safety Project, and the Westline Bus Queue Jump Lane.
• Alameda CTC approved the request, which then had a public comment period.
2026:
• Alameda CTC approved amendment on January 22, 2026.
• Pending agreements with Alameda CTC, proceed with project planning for reprogrammed transit project funding.

Information: January 22, 2026 Alameda CTC Meeting
Bus Service (AC Transit)

S, G, TC
2025:
• AC Transit began Realign service changes in August 2025. City staff supported public communications about new service.
• Coordinated with AC Transit for location and design of temporary bus stops for the re-routed line 19.
2026: Construct temporary bus stops for re-routed line 19. Final design for the new stops will be constructed with the Stargell Avenue Complete Street Project.

Information: actransit.org/Realign
Oakland Alameda Water
Shuttle Pilot (City, WETA,
Alameda TMA)

S, TC, ATP
2025:
• One-year service milestone reached in July; provided 125,301 total rides in 2025.
• Started Tuesday service and tested expanded weekend service for four months (July-October).
• Secured $730,000 in grant funding, to match Partnership funding, for Years 3 and 4 operations.
• Advocated for and secured $931,000 from Alameda CTC to run an expanded schedule during OAAP construction period.
• Applied for and received one-year extension request for complying with the California Air Resources Board (CARB) vessel electrification requirement. • In May, received Transportation Planning Award of Excellence from American Planning Association’s northern section.
2026:
• Re-launch expanded weekend hours on March 10, to continue into 2027. • Complete an evaluation of the initial two-year pilot by Fall. • Complete study identifying recommendations for CARB compliance, and seek funding to implement.
• Begin study of long-term options for water shuttle operations.

Information: alamedaca.gov/WaterShuttle
Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 14 Program Status Report
San Francisco Bay Ferry
Service (WETA)
TC
2025: Preliminary planning & design for electrification of Harbor Bay & Seaplane terminals underway and led by SF Bay Ferry.
2026: SF Bay Ferry will obtain entitlements & permits for electrification of Harbor Bay & Seaplane Lagoon terminals.

Information: sanfranciscobayferry.com/our-ferry-future/

Link21 regional rail
service planning (BART,
Capital Corridor)
S, TC
2025:
• In June, the BART and Capitol Corridor Joint Powers Authority (CCJPA) Boards agreed to advance Link21 using standard-gauge regional rail, with CCJPA assuming day-to-day management responsibilities.
• While the standard-gauge choice rules out the possibility of future BART in Alameda, Alameda still has a good chance of gaining a rail station on the West End due to its location between downtown Oakland and San Francisco. 2026: Continue to monitor and provide input on Link21 rail planning as the project progresses to identifying alignment and station locations.

Information: link21program.org
Alameda
Connect/Paratransit (City)
2025:
• Expanded Alameda Independent Mobility (AIM) eligibility to all residents 70+. • Extended the AC Transit Free Bus Pass program contract for an additional two years.
• Undertook annual enrollment renewals for the Free Bus Pass and AIM programs with new paperwork requirements.
• Held monthly Transportation 101 & Senior Clipper Card events. • Began partnership the Center for Independent Living to offer public transit travel training outings and held first outing to the San Francisco Ferry Building.
• Launched new Alameda Connect branding.
2026:
• Continue programming in all current programs.
• Complete program review by Nelson\Nygaard.

Information: alamedaca.gov/Paratransit
Harbor Bay Business Park
Shuttle (City, Harbor Bay
Business Park
Association)

2025: ADA upgrades for Harbor Bay Business Park Shuttle at bus stops and the Harbor Bay Ferry terminal are complete. New bus shelters and signage have also been installed.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 15

CAPITAL PROJECT PLANNING & DESIGN
Project Status Report
Fernside Blvd Traffic
Calming & Bikeways
Project
+
Gibbons/High/Fernside
Blvd Safety Updates

VZ, ATP
High Injury Corridor

2025:
• Final concept approved March 2025: Near-Term Design Concept – Quick- Build Pedestrian Median Islands with Buffered Bike Lanes; Long-Term Design Concept – Pedestrian Median Islands with Two-Way Protected Bikeway. • Completed traffic study, conducted public outreach, and held public hearings regarding design concepts at the intersection of Gibbons Dr, High St, and Fernside Blvd.
2026:
• Construct near-term design concept on Fernside Blvd west of High St with Pavement Program.
• Design two quick-build roundabouts and four speed humps in the Gibbons Dr area per City Council direction; construct in 2026 or 2027. • Monitor funding opportunities for long-term Fernside Blvd design.

Information: alamedaca.gov/Fernside
Gibbons Sidewalks & Trees
Plan
2025: Consultant assessed the health and structural condition of liquidambar trees along Gibbons Drive.
2026: Develop a plan for trees and sidewalks on Gibbons Drive that balances public safety, infrastructure needs, and the preservation of Alameda’s beloved tree canopy.

Information: alamedaca.gov/GibbonsTrees
Lincoln/Marshall/Pacific
Ave Corridor

S, VZ, ATP, TC
High Injury Corridor
Includes Equity Priority Areas
2025:
• Worked with Alameda CTC to repurpose Measure BB bus-related funding for this corridor.
• City Council approved the Safe Streets for All (SS4A) funding from the U.S.

Department of Transportation (USDOT).
• Consultant team completed 65 percent design.
2026:

Execute agreement with Alameda CTC for repurposed bus-related Measure BB funding for this corridor. Execute agreement with USDOT for SS4A funding.

Complete design and prepare for construction in 2027. Federal funding may be in jeopardy due to the new administration.

Information: alamedaca.gov/LincolnMarshallPacific
High Injury Corridor
Daylighting
VZ
High Injury Corridors
Includes Equity Priority Areas

2025: Tier 3 daylighting has been completed in the effort to improve visibility for motorists and pedestrians at high-risk intersections. The High-Injury Corridor Daylighting project is complete and the City will continue marking red curb for daylighting as part of all other roadway projects.

Information: alamedaca.gov/HICdaylighting

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 16 Project Status Report
Neighborhood Greenways:

Planning/Design

S, ATP, CIP
Includes 1 High Injury
Corridor
Includes Equity Priority Areas
2025:
• Conducted community outreach, collected speed and volume data, and developed concept plans for Morton St/San Jose Ave and Versailles Ave Neighborhood Greenway segments.
• In May, the City’s grant application for $2M to improve four Neighborhood Greenway crossings of major streets, including at Pacific Ave and Wilma Chan Way, was awarded by Alameda CTC.
• In December, the City’s joint AHSC grant was selected for funding, which includes funding to design and construct the Neighborhood Greenway on 3rd St/Mosley Ave from Central Ave to Stargell Ave.
2026:
• Design crossing improvements for Pacific Ave at Wilma Chan Way. • Select up to one mile of Phase 2 Neighborhood Greenway and begin design. • Continue to seek grant funding to implement additional Neighborhood Greenways.

Information: alamedaca.gov/NeighborhoodGreenways
Oakland Alameda Estuary
Bridge

S, ATP, TC

2025: Selected consultant and began Waterways Study
2026: Conduct Waterways Study, including Estuary vessel traffic data collection and navigational simulation, with Study completion in mid-2027.

Information: estuarybridge.org
Safe Routes to School
Infrastructure

S, VZ, ATP, TC, CIP
2025: Constructed select improvements at the seven schools with completed School Safety Assessments sites: Academy of Alameda, Earhart, Edison, Franklin, Love, Maya Lin, and Nea.
2026: Design improvements at school sites with newer School Safety Assessments: Alameda High, Bay Farm School, Otis Elementary and Ruby Bridges Elementary.

Information: alamedaca.gov/SchoolStreets
Stargell Ave Safety
Improvements

S, VZ, ATP, TC
2025:
• Project concept plan was approved at City Council in April, including roundabouts and new bus stops for Line 19.
• 35% design and environmental studies began in July 2025. • The project’s first phase, from Main Street to 5th Streeet, was awarded multiple grants in 2025 from MTC, Alameda CTC, and through the City’s AHSC grant for Stardust Gardens.
2026:
• Complete 35% design and environmental studies for Phase 1. • Begin PS&E for Phase 1.

Information: alamedaca.gov/Stargell
Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 17 Project Status Report
Bay Farm Wooden Bridge
(East Bay Regional Park
District/City)
2025:
• East Bay Regional Park District made minor improvements to the surface of the Wooden Bridge and placed new signs instructing bicyclists to dismount and walk their bikes.
• City staff began discussions with EBRPD on refurbishing the Wooden Bridge to allow it to be usable and comfortable until a long-term solution can be developed, funded and built.
• Developed and submitted two grant applications to study and develop long- term replacement options for the Wooden Bridge.
2026:
• Pending funding availability, develop options for mid-term bridge refurbishment improvements.
• Continue to seek funding to develop and implement mid- and long-term solutions for the Wooden Bridge.

CAPITAL PROJECT CONSTRUCTION
Project Status Report
Alameda Point Adaptive
Reuse
S, CIP
Equity Priority Area
2025:
• The existing parking lot reconstruction on Saratoga Street was completed in Spring 2025.
• Council accepted the Phase I Adaptive Reuse Project as complete in July 2025.
2026:
• Continue working on design for Phase II which extends the street improvements on West Tower and West Midway from Saratoga Street to including Monarch Street.
• Construction timing pending funding availability
Information: alamedaca.gov/AdaptiveReuse
Bicycle Rack Installation

2025:
• Developed list of high priority bike rack locations citywide. • Secured grant funding to partially fund rack purchase and installation. • Began design for bike rack installation.
2026: Complete design for and install up to 100 racks in high priority locations.

Central Ave Improvements

S, VZ, ATP, CIP, TC
High Injury Corridor
Equity Priority Area (partial)
2025:
• This $23 million project includes traffic calming, protected bikeways, pedestrian crossing improvements, and the City's first three modern roundabouts.
• Construction began in 2025 and has made substantial progress. Two of the three roundabouts have been completed. The two-way cycle track has been constructed with striping and signage to be installed in early 2026. 2026: Completion of the project is anticipated by spring 2026.

Information: alamedaca.gov/Central
Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 18 Cross Alameda Trail:

Clement Ave/Tilden Way

S, VZ, ATP, TC
High Crash Intersection
2025: Project began construction in October 2025.
2026: Complete construction in late 2026 or early 2027.

Information: www.alamedaca.gov/ClementTilden
Cross Alameda Trail: Jean
Sweeney Open Space Park
Trail Connectors (led by
ARPD)
ATP
Equity Priority Area
2025: Discussions continued with Department of Toxic Substances Control (DTSC) and the project designers to find implementable design solutions within the project budget.
2026: Pending DTSC approval, complete construction in 2026.

Information: alamedaca.gov/CAT
Cross Alameda Trail: Signal
and Intersection
Improvements, Main St to
Wilma Chan Way
VZ, AT
High Injury Corridor
Equity Priority Area

2025:
• Installed separated left-turn phasing for westbound approach at Wilma Chan Way.
• Project is complete and staff continues to monitor for additional signal timing and or signage updates.

Information: www.alamedaca.gov/CAT
Cross Alameda Trail:

Clement Ave Extension
(Ohlone Ave to Grand St)

S, VZ, TC, CIP
High Injury Corridor
Equity Priority Area
2025: Bicycle access on the Clement Avenue extension between Grand Street and Ohlone Avenue opened in November 2025, creating a continuous biking connection from Broadway to Seaplane Lagoon.
2026: Southern-side Clement sidewalk opened in early 2026. Developer plans to begin construction of housing units north of Clement. Northern Clement sidewalk will open when those units are complete.

Information: alamedaca.gov/CAT

Grand St Improvements
High Injury Corridor

S, VZ, ATP

2025:
• Phase 1 (Shoreline Dr. to Otis Dr) includes repaving Grand Street and installing two-way separated bike lane. Construction began in May and was completed in September.
• Phase 2 (Otis Dr to Encinal Ave.) design progressed to 35%. 2026: Complete design for Phase 2; construction to begin in late 2026 or early 2027.

Information: alamedaca.gov/Grand
Mecartney Rd Pedestrian
Improvements
S, VZ

2025: Construction completed and accepted by City Council in July 2025, including flashing beacons and crossing improvements at three locations on Mecartney Rd.

Information: alamedaca.gov/rapidresponse

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 19 Neighborhood Greenways:

Phase 1

S, ATP, CIP
Includes 1 High Injury Corridor
Includes Equity Priority Areas
2025: Constructed first segment of Pacific Ave Neighborhood Greenway (Lafayette to Oak), including new all-way stop signs, asphalt speed humps, and a neighborhood traffic circle at Chestnut/Pacific.
2026: Finalize designs for and construct remaining Phase 1 Slow Street segments of Neighborhood Greenways on Pacific Ave, Morton St/San Jose Ave and Versailles Ave.

Information: alamedaca.gov/NeighborhoodGreenways
Park and Webster St Striping
Update & Concrete
Barricades
High Injury Corridors
Equity Priority Area (partial)

2025: Parklets and barriers were removed and continue to be removed for businesses that elect not to renew their parklet agreements. Curb areas have been returned to parking with an emphasis on installing short-term parking.

Information: alamedaca.gov/CommercialStreets
Pavement Management &
Safety Improvements
High Injury Corridors (partial)

2025:
• Consistent with the City’s Vision Zero Plan and Active Transportation Plan, Aughinbaugh Way, Mecartney Road, and Maitland Drive include treatments to support pedestrian, bicycle, and vehicular safety. • Began design for 2026 paving project in west Alameda, evaluate streets for pavement resurfacing and safety improvements.
2026:
• Phase 43, which focuses on the Bay Farm zone (east of High Street and Bay Farm Island), is estimated to be completed by March 2026. • Complete design for 2026 resurfacing project and begin construction.

Information: alamedaca.gov/Pavement
Sidewalk Maintenance

CIP, ATP

2025:
• Initiated a new Sidewalk Repair Program in 2025 offering option to homeowners for City to repair sidewalk and send invoice. This makes the repair process much simpler and allows for economies of scale in pricing. • The program upgraded 1 curb ramp, repaired 36,400 square feet of sidewalk in 512 locations, and removed trip hazards using saw cuts at over 7,600 locations in 2025.
2026:
• Continue sidewalk maintenance and repair.
• Remove and replace 20 curb ramps to improve public right-of-way accessibility.

Information: alamedaca.gov/Sidewalks
Trails Maintenance
(Construction)

CIP, ATP

2025: Repaved trail between Harbor Bay Ferry Terminal and Mecartney Rd as part of Harbor Bay Ferry Terminal Improvements.
2026: Complete repaving of bike trails along Veterans Court, Island Drive, and Mecartney Road as part of Pavement Management Project Phase 43.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 20 Signal and Pedestrian
Improvements (HSIP)
CIP
Includes High Injury Corridors

2025: Completed construction at four intersections: Santa Clara Ave at Grand St; Otis Dr at Willow St; Otis Drive at Park St; and Fernside Blvd at San Jose Ave.

Striping Maintenance
CIP
Includes High Injury Corridors
Includes Equity Priority Areas
2025: Striping maintenance was complete in April 2025 at various locations including Wilma Chan Way, RAMP, Viking St, W Hornet Ave, Webster St, Santa Clara Ave, Clement Ave, Buena Vista Ave.
2026: Design and construct 2026 maintenance project.

Traffic Signal Improvements
CIP
Includes High Injury Corridors
2026:
• Improve signals at Broadway/Central, Broadway/Santa Clara, Park Blanding, Park/Clement, and evaluate improvements at Fernside/High. • Coordinate with Alameda Fire to install and Emergency Vehicle Preemption along critical fire response corridors

OTHER AGENCY & DEVELOPER
-

LED TRANSPORTATION PROJECTS
Project Status Report
AC Transit: Transit Signal
Priority on Park Street
2025: Design project
2026: Construct project
Caltrans:

Broadway/Otis/Doolittle
High Injury Corridors
Includes Equity Priority Areas
2025:
• At Caltrans’ presentation to the Transportation Commission in May 2025, they agreed to include Pedestrian median islands at Otis/Mound and Otis/Versailles, with the planned flashing beacons at both legs of the crosswalks, and quick-build bulb-outs at Otis/Bayview.
• Caltrans has also promised a follow-up safety project for the Rt 61 segment of Otis Dr: outreach/concepts 2026-2027, funding 2028, and construction by the early 2030s.
2026: Caltrans to construct in 2026 or 2027
Alameda CTC: Oakland
Alameda Access Project
High Injury Corridors
Includes Equity Priority Areas
2025:
• Alameda CTC held public information workshops, including two in Alameda, in the spring.
• Construction contract awarded and approved in August. 2026: Construction is expected to begin in March 2026, with continuous and frequent public communications throughout the construction period.

Information: OaklandAlamedaAccessProject.com
Army Corps: Fruitvale Rail
Bridge Hazard Removal
2025: U.S. Army Corps of Engineers (USACE) is working on a Real Estate Disposal Report to the General Services Administration (GSA), and the GSA is expected to resume environmental and cultural coordination when that is complete.
2026: The City will continue to follow up with USACE and the GSA to address bridge safety concerns.

Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 21

STAFFING, FUNDING, AND GRANT

PRIORITIES
Funding and Staffing Resources
Alameda’s transportation work is funded by a variety of sources. The most significant and stable sources have been from Alameda County Measures B and BB transportation sales taxes and the Vehicle Registration Fee (VRF).

The tax authorization for Measure B expired in 2022 after 20 years and remaining funds have been expended as of the end of Fiscal Year 24/25. These funding sources are combined with competitive grants and General Funds to pay for maintenance, capital projects, programs, and staffing.

In June 2025, the City’s overall Measure B, Measure BB, and VRF fund balance was $ 5.2 million. The City programmed use of these funds via the FY 2025-2027 Capital Budget, including for major projects that are under or will begin construction in 2026.

Measures B, BB, and VRF Fund Status for Fiscal Year 24/25, ending June 30, 2025 Fund Starting Balance Revenue Expenditure Balance
Measure B $1,066,060 $61,830* $1,127,890 $ -
Measure BB $9,042,809 $6,487,776 $10,249,794 $5,280,791 Vehicle Registration Fee $633,999 $351,544 $1,105,665 $(120,123)** Total $10,742,868 $6,901,150 $12,483,349 $5,160,668
* Revenue summary includes interest and adjustments. There is no remaining Measure B revenue or fund balance. **Planned expenditures in Fiscal Year 25/26 are reduced to account for negative fund starting balance.

Public Works: Transportation Engineering Staffing (6.3 FTE) • Erin Smith, Public Works Director (part time to transportation) • Scott Wikstrom, City Engineer (part time to transportation) • Brendin Christolear, Supervising Civil Engineer (part time to transportation) • Trung Nguyen, Project Manager II (part time to transportation) • Alan Ta, Project Manager I
• Ali Hatefi, Senior Engineer (part time to transportation) • Cody Lim, Assistant Engineer
• Aaliyah Douglas, Assistant Engineer (part time to transportation) • Michaela Wood, Assistant Engineer (part time to transportation) In addition, the Public Works Maintenance Division, Administration Division, and Construction Inspectors provide resources for maintaining existing infrastructure, managing projects, and construction oversight.

Planning, Building, and Transportation Department: Transportation Planning Staffing (3.1 FTE) • Allen Tai, Planning, Building, and Transportation Director (part time to transportation) • Lisa Foster, Transportation Planning Manager
• Rochelle Wheeler, Senior Transportation Coordinator
• Susie Hufstader, Senior Transportation Coordinator
Transportation 2025 Annual Report & 2026 Work Plan DRAFT March 17, 2026, p. 22 2025 Grant Application Priorities
To conserve staff resources and focus on adopted plan goals, staff identified possible projects and programs for grant funding and scored them to create a list of priority projects for grant proposals in 2025. Projects were scored based on how well a project meets each of the adopted General Plan Mobility Element goals, plus whether any funding has been allocated to date. Only the top projects are included on the list. The applications that are ultimately submitted will depend on how well the projects match available funding sources, and lower scoring projects may be submitted if they are a particularly good fit for a funding source.

Project Description
Active Transportation Plan
update
Update the Active Transportation Plan. This 5-year plan was adopted in late 2022, so should be updated by late 2027.

Alameda Point: New
Transportation Infrastructure
Reconstruct roadways with complete streets in Alameda Point, including Main St and Adaptive Reuse Area, as City invests in new utility infrastructure and builds climate resiliency
Oakland Alameda Water
Shuttle
Continue operations of water shuttle between West Alameda and Jack London Square, with public and private partners
Fernside Blvd Traffic Calming
& Bikeways Project
Build long-term option for entire corridor, from Tilden Way to San Jose Ave Grand Street Improvements
North of Encinal Ave
Design and build Grand Street improvements, with cycle-tracks, from Encinal Ave to Clement Ave
Lighting along Cross Alameda
Trail on RAMP
Add lighting along bicycle and pedestrian pathways, from Main St to Wilma Chan Way Lincoln/Marshall/Pacific Ave
Corridor Safety Improvement
Major safety improvements for three miles of this corridor from Broadway to Main - Federal funding may be in jeopardy due to the new administration.

Neighborhood Greenways Neighborhood Greenway implementation, as outlined in the Active Transportation Plan
Oakland-Alameda Estuary
Bridge
New bicycle/pedestrian connection across the estuary. Work with partner agencies to secure funding for environmental phase, to be led by a (non-City) public agency (TBD).

Resurfacing Streets Secure additional funding to support expanded complete street and green infrastructure elements of street repaving projects
Roundabouts Implement highest scoring roundabouts
Safe Routes to School Access
Improvements
Implement Safe Routes to School Access Improvements at locations with new School Safety Assessments
Safety Improvements at High
Crash Intersections
Upgrade and improve locations identified as high crash intersections in the Vision Zero Action Plan; could include roundabouts, signal upgrades, and/or other upgrades Street Re-designs for
Park/Oak and Webster Streets
Evaluate, design, and construct initial phase improvements for all modes and business districts, per Active Transportation Plan and Commercial Streets program.

Trails Maintenance Upgrade and maintain existing trails citywide.

Westline Dr/8th St Bikeways Add new bikeways and shared-use trails between Otis St and Central Ave.

Wooden Bridge
Refurbishment and
Replacement
Upgrade and extend life of current Bay Farm Wooden Bridge (with EBRPD), and plan for long-term replacement of Bridge.

Harbor Bay Pkwy
Fruitvale Ave29th Ave
High Street

PARK ST
BRIDGE

FRUITVALE
BRIDGE

HIGH ST
BRIDGE

POSEY TUBE

WEBSTER TUBE

BAY FARM

ISLAND BRIDGE

OAKLAND
FERRY

TERMINAL

MAIN ST

FERRY TERMINAL

SEAPLANE LAGOON

FERRY TERMINAL

HARBOR BAY

FERRY TERMINAL
Westline Dr
Lincoln Ave
Atlantic Ave
Central Ave
Central Ave
Encinal Ave
Lincoln Ave
Clement Ave
Shore Line Dr
R a l p h A p p e z z a t o M e m o r i a l Grand St
S t a r g e l l A v e
Main St
Mecartney RdIronwood Rd
Verdemar Dr
Fir Place
Begonia Dr
A St
Penumbra
North Loop Rd
Melrose Ave
Tralee Ln
Shannon Cir
Applegate Wy
Marcus St
M a i t l a n d D r
R o b e r t D a v e y J r D r
Aughinbaugh Way
Broadway High St
Bette St
Singleton Ave
Fourth St
Willow St
Otis Dr
Ferry Point
Pan Am Way
Lexington St
Saratoga St
Monarch St
W Atlantic Ave
Sherman St
Fifth St
Willow St
Park St
Oak St
Taylor Ave
Tilden Way
Pacific Ave
Webster St(State Rt 61)
Bay St
St. Charles St
Morton St
Alameda Ave
San Antonio Ave
Clinton Ave
Santa Clara Ave
Buena Vista Ave
Sixth St
Haight Ave
Eighth St
Mason St Ninth St
Pacific Ave
Viking St Orion St
W Hornet Ave
Third St
Benton St
Chestnut St
Union St
Lafayette StSchiller St
Paru St
Minturn St
Hibbard St
Jack London Ave
Rober Louis Stevenson Ave
Wood St
Chapin St
W Trident Ave
Christi Rd
Skyhawk St
Burbank St
Weber St Caroline St
Rosewood Way
Fifth St
Mosley Ave
M i t c h e l l A v e Mariner Square Dr
M a r i n a V i l l a g e P k w y
I n d e p e n d e n c e D r
Challenger Dr
Triumph Dr
O rion S t
Santa Clara Ave
W Ticonderoga Ave
W Oriskany Ave
Buena Vista Ave
Pearl St
Versailles Ave
G i b b o n s D r i v e
Fernside Blvd
Windsor Dr
M a r i n a D r
Fairview Ave
Thompson Ave
Liberty Ave
Sterling Ave
Briggs Ave
Encinal Ave
Madison St
Central Ave
Fountain St
Eagle Ave
Walnut St
Fernside Blvd
Veteran’s Crt
Calhoun St
W Midway Ave
W Essex Dr
W Red Line Ave
Main St
W Tower Ave
Doolittle Drive
Page St
Park Ave
Van Buren St
Jackson St
San Jose Ave
Otis Dr
Fillmore St
Mound StRegent St Delmar Ave
Entrance Rd
Coronado Ave
Frontman St
Baywood Rd
B a y w a l k Rd
C a t a l i n a A v e
Lilac S t
S e a V i e w W a y
M arin e r S q u a r e L o o p
Islan d D r B ik e P a t h
Wilma Chan Way
Estuary
Park
Washington
Park
Jean Sweeney Park
Lincoln
Park
Corica Park
Golf Course
Alameda Nature
Reserve (future)
Northwest Territories
Park (future)

O A K L A N D E S T U A R Y

S A N F R A N C I S C O B A Y
S
A

N L E A N D R O
B
AY

SEAPLANE
LAGOON
TRANSPORTATION CAPITAL PROJECTS (UPDATED FEBRUARY 2026) Parks
Future Parks
Schools + Libraries
Commercial
Corridors
Intersections 7
6 8
3 2
1 Lincoln/Marshall/Pacific Avenue Corridor Safety Improvement Project Grand St Resurfacing & Safety Improvements: Otis to Encinal Oakland Alameda Estuary Bridge Waterway Study
Alameda Point Adaptive Reuse: Phase 2
Stargell Ave Complete Street
Safe Routes to School Infrastructure
Wooden Bridge Planning
Pacific Ave/Wilma Chan Way Crossing Improvements
Traffic Signal Improvements
Fernside Blvd Traffic Calming & Bikeways Project: Near Term West Midway Development [Private Developer]
Oakland Alameda Access Project [Alameda CTC]
Broadway/Otis Dr/Doolittle Dr Pavement Resurfacing and
Safety Improvements [Caltrans]
Neighborhood Greenways (Slow Street segments)
Jean Sweeney Open Space Park Trail Connectors
Clement Avenue/Tilden Way Improvements
ADA Curb Ramp Updates
Central Avenue Safety Improvement Project
Clement Ave Extension: Hibbard to Grand [Private Developer] Civic Center Parking Garage Enhancements
PLANNING/DESIGN PHASECONSTRUCTION PHASE 1
5 7
10 2
44 53
1 GENERAL
8 2#
#
6 5
12 9
11 N
4 4
8 1
MAYA
LIN ES

FRANKLIN ES

EARHART
ES
EDISON
ES

ACADEMY

OF ALAMEDA
NEA

COMMUNITY

LEARNING
CENTER
3 1

LINCOLN
MS

BAY FARM
SCHOOL

OTIS ES
RUBY

BRIDGES ES
2 2
10 LOVE ES
7 5
11 6
6 6
12 1
5 5
5 4
4 6
6 6
6 8
7 Projects move to the
Construction Phase once
Planning/Design Phase is
completed, and project is
fully funded. On-the-ground
construction may take some
time to begin.
1 1
1 1
9 9
9 9
9 9
9 9
99 9
9 3
3 3

ALAMEDA HS
Vision Zero Annual Report March 17, 2026, p. 1 City of Alameda

Progress Toward
Zero Traffic
Fatalities
Alameda Vision
Zero
202
5 Annual
Performance Metrics
Report
DRAFT

City of Alameda, DRAFT March 17, 2026
Vision Zero Annual Report March 17, 2026, p. 2

Contents
TRAFFIC FATALITY & INJURY REPORT 3
2025 Fatal and Severe Injury Crashes 3
Crash Trends Overview 6
State and County Comparison 6
2011-2025 Traffic Fatalities & Injuries 7
Young People & Older Adults 8
VISION ZERO ACTIONS 9
Street Safety Improvement Projects 9
Police Traffic Enforcement Prioritization 10
Street Safety Concern Reports 10

Vision Zero Annual Report March 17, 2026, p. 3

TRAFFIC FATALITY & INJURY REPORT
This is the fourth annual report on the Vision Zero
Action Plan, which the Alameda City Council
adopted in December 2021. This report covers the
performance metrics outlined in the Plan. For
details on traffic safety and Vision Zero projects
and programs, see the Transportation 2025
Annual Report & 2026 Work Plan.

In 2025, 1 person lost their life, 8 people were
severely injured, and a total of 227 people were
injured in traffic collisions on Alameda streets.
“People of all ages and abilities can
travel safety using any mode, and
traffic deaths and serious injuries
are eliminated by 2035.”
202
5 FATAL AND SEVERE INJURY CRASHES
In 2025, 1 person lost their life and 8 were severely injured in traffic collisions on Alameda streets. Every traffic fatality represents a tragic loss for loved ones and the community, and severe injuries can change a life forever.

After every fatal crash, City staff convene post-collision site visits including transportation planners and engineers with Police Traffic Unit leadership. In 2023, the City launched its Fatal Crash Response program, which includes transparent public information about fatal crashes and installs quick-build infrastructure at the sites of fatal crashes when possible. More information is at www.alamedaca.gov/fatalcrashresponse.

Vision Zero Annual Report March 17, 2026, p. 4 Of the 9 fatal and severe injury collisions in 2025, 6 occurred on High Injury Corridors. A high portion (5) were solo collisions .

Four of the people severely injured were on an electric bicycle (Class 2), scooter, or skateboard, mostly in solo collisions. Note that, according to State guidelines, the severe injury category can include everything from a broken wrist to life -threatening injuries.

Table 1: 2025 Traffic Fatality & Severe Injury Details

LOCATION
DATE &
TIME (202
5 )

DESCRIPTION

MODE OF
PERSON

KILLED OR

SEVERELY

INJURED
AGE
Ralph Appezzato
Memorial Parkway
(RAMP)/Poggi St
January 15,
6:24 pm
A person driving a mid-size SUV northbound on Poggi St made a westbound left turn onto RAMP, striking a person walking southbound across RAMP in the western crosswalk and causing fatal injuries. The pedestrian died in the hospital that evening.

Pedestrian 59
Oak St/Buena Vista
Ave
January 12,
8:30 am
A person riding a Class 2 e-bike westbound on Buena Vista Ave did not stop at a red light and struck a mid-size car being driven southbound on Oak St, in a broadside collision. The bicyclist suffered multiple severe injuries.

Bicyclist 35
High St/Encinal
Ave
June 21, 5:05
pm
A person driving a full-size, extended-length SUV southbound on High St was at a red light while a wheelchair user headed westbound on Encinal Ave into the northern crosswalk. When the High St light turned green, the wheelchair user was in the crosswalk immediately in front of the SUV. The driver moved forward and struck the wheelchair user, who suffered severe injury.

Pedestrian 88
West Tower
Ave/Lexington St
July 8,
10:35 pm
A person riding an e-scooter was turning right from westbound West Tower Ave onto northbound Lexington St when they struck a curb and fell, suffering multiple severe injuries (solo collision).

Driver
(scooter)* 32
Lincoln
Ave/Broadway
July 16,
12:20 am
An intoxicated person driving a mid-size sedan eastbound on Lincoln Ave struck a parked car and suffered severe injuries (solo collision). Driver 26 Park St south of
Alameda Ave
July 31,
6:52 pm
A person was riding a Class 2 e-bike northbound on Park St between Encinal Ave and Alameda Ave when they fell off their bike, suffering an injury (solo collision).

Bicyclist 23
Island Dr north of
Robert Davey Jr Dr
August 10,
4:35 pm
A child riding a bike northbound on the west bike path of Island Drive was riding on the grass edge of the path when they lost control of their bicycle and fell, suffering an injury (solo collision).

Bicyclist 10
Central Ave/Oak St September
9, 6:15 pm
A person was riding a single-wheel electric skateboard westbound on Central Ave across Oak St when the device had a mechanical issue.

The rider fell and suffered injury (solo collision).

Driver (electric
skateboard)* 29
Webster St/Eagle
Ave
December
29 Forthcoming Pedestrian 48
*State collision reports do not have specific categories for these micromobility devices.

Vision Zero Annual Report March 17, 2026, p. 5 2022-2025 Fatal and Severe Injury Crashes

Vision Zero Annual Report March 17, 2026, p. 6

CRASH TRENDS OVERVIEW
To help understand change over time, the City tracks collision trends over many years. Because Alameda is a small city with relatively low numbers of deaths and severe injuries, a rolling average analysis helps smooth out noise in the data and identify trends. Each data point in Figure 1 represents the average of that year and four prior years, e.g., the 2014 figure is the average of 2010-2014.

Figure 1: Rolling Five-Year Averages, Traffic Fatalities + Severe Injuries by Mode, 201-2025 Data

STATE
AND

COUNTY COMPARISON
The City’s rates of traffic fatalities and severe injuries are lower than those in the county and state. Recent local trends generally match national ones, with increases in fatal and severe collisions in 2021 and 2022 that are starting to go down again.1
Figure 2: Traffic Fatalities + Severe Injuries Rate Per 100,000 Population

1 https://www.transportation.gov/NRSS/SafetyProblem
0 1
2 3
4 5
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Pedestrians Bicyclists In a motor vehicle Riding a motorcycle 0 10
20 30
40 50
60 70
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 California Alameda County City of Alameda
Vision Zero Annual Report March 17, 2026, p. 7 2011
-
2025

TRAFFIC FATALITIES & INJURIES
Table 2: Traffic Fatalities and Injuries, 2011-2025

2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
All collisions
Killed 3 2 0 2 4 2 3 3 1 4 4 2 3 1 1
Severely
injured 11 10 12 10 11 10 8 9 6 5 9 13 6 11 8
All injury
collisions 207 227 228 224 190 261 241 218 220 191 158 220 204 251 227 Pedestrians
Killed 1 0 0 2 2 1 0 2 0 2 2 0 1 0 1
Severely
injured 5 3 4 3 2 4 3 1 3 2 3 3 3 2 2
All injuries 39 30 37 29 32 46 37 23 28 22 29 27 34 45 33 Bicyclists
Killed 1 0 0 0 0 1 0 0 0 1 1 0 0 0 0
Severely
injured 4 4 4 2 4 2 2 3 1 0 2 3 1 5 3
All injuries 46 38 43 43 27 37 33 28 25 22 12 29 22 47 33 In a motor
vehicle
Killed 0 0 0 0 2 0 3 1 0 1 1 1 2 0 0
Severely
injured 1 3 1 2 3 2 1 3 2 3 3 7 1 3 3
All injuries 109 148 130 142 122 163 157 155 148 130 113 152 142 148 150 Riding a
motorcycle
Killed 1 2 0 0 0 0 0 0 1 0 0 1 0 1 0
Severely
injured 1 0 3 3 2 2 2 2 0 0 1 0 1 1 0
All injuries 13 11 18 10 9 15 14 12 12 6 4 8 6 10 7
Source: Alameda Police Department (2021-2024) and Statewide Integrated Traffic Records System (SWITRS, 2011- 2020). Pedestrian severely injured data from 2024 has been updated to show one more severe injury since the last annual report due to a correction to the data.

Vision Zero Annual Report March 17, 2026, p. 8

YOUNG PEOPLE & OLDER ADULTS
The Vision Zero Action Plan’s 2009-2018 crash data analysis found that older adults and young people were disproportionately vulnerable to fatalities and serious injuries in crashes. In 2025, 40 people aged 65+ were injured in collisions (18%), one severely, and no fatalities were older adults. A total of 26 children and youth were injured (11%), one severely, and no fatalities.

Table 3: 2024 Traffic Fatalities & Injuries, Older Adults

202
4 202
5 All modes
Killed 0 0
Severely injured 3 1
All injuries 29 40
Pedestrians
Killed 0 0
Severely injured 1 1
All injuries 6 7
Bicyclists
Killed 0 0
Severely injured 0 0
All injuries 4 4
In a motor vehicle
Killed 0 0
Severely injured 0 0
All injuries 19 25
Riding a motorcycle
Killed 0 0
Severely injured 0 0
All injuries 0 4
Table 4: 2024 Traffic Fatalities & Injuries, Youth <18

202
4 202
5 All modes
Killed 0 0
Severely injured 0 1
All injuries 39 26
Pedestrians
Killed 0 0
Severely injured 0 0
All injuries 3 3
Bicyclists
Killed 0 0
Severely injured 0 1
All injuries 13 10
In a motor vehicle
Killed 0 0
Severely injured 0 0
All injuries 23 12
Riding a motorcycle
Killed 0 0
Severely injured 0 0
All injuries 0 0
Vision Zero Annual Report March 17, 2026, p. 9

VISION ZERO ACTIONS
In addition to reporting on collision data each year, the City tracks progress on actions from the Vision Zero Action Plan. For more information on transportation projects and programs, including street safety projects, see the Alameda Transportation 2025 Annual Report and 2026 Work Plan.

STREET SAFETY IMPROVEMENT PROJECTS
Per the Vision Zero Action Plan, the City prioritizes projects on High Injury Corridors and in Equity Priority Areas.

In 2025, the City delivered safety improvements via maintenance and through capital projects.

Table 5: Safety Improvements at Intersections, 2025

INTERSECTION OR MID
-
BLOCK

CROSSING IMPROVEMENT TYPE

INTERSECTIONS
IMPROVED 2024
%

IN EQUITY

PRIORITY AREAS
%

ALONG HIGH

INJURY CORRIDORS
% WITHIN 600’ OF

SCHOOLS
New Daylighting (new red curb) 64 11% 78% 27%
New Concrete Bulb-outs 2 0% 100% 100%
New Striped Bulb-outs 18 6% 67% 44%
New Marked Crosswalks 7 0% 57% 29%
New/Upgraded High Visibility
Crosswalks 16 0% 56% 44%
New Signal Improvements for
Safety 3 0% 100% 0%
New RRFBs 4 0% 25% 25%
Other Improvements 17 6% 53% 53%

ALL INTERSECTIONS IMPROVED
7 9
10%
75%
33%
Because many intersections get multiple improvements, "all intersections improved" is not the sum of the above .

Table 6: Safety Improvements on Corridors, 2025

ROADWAY IMPROVEMENT TYPE

MILES IMPROVED
2024
% IN EQUITY

PRIORITY AREAS
%

ALONG HIGH

INJURY CORRIDORS
% WITHIN 600’ OF

SCHOOLS
Lane width reduction 0.43 0% 100% 63%
New shared-use paths or separate
walking/biking paths 0.5 0% 0% 0%
New Neighborhood Greenways 0.59 0% 0% 37%
New bike lanes 0.67 0% 100% 27%
Road Diet 0.51 0% 100% 35%
Speed Humps 0.54 0% 0% 31%
ALL

ROADWAY MILES

IMPROVED

1.69 0
%
56%
40%
Because streets often get multiple improvements, “all roadway miles” is not the sum of the above.

Vision Zero Annual Report March 17, 2026, p. 10

POLICE TRAFFIC ENFORCEMENT PRIORITIZATION
Per the Vision Zero Action Plan, the City focuses traffic enforcement on behaviors associated with severe and fatal crashes and along High Injury Corridors. In 2025, the Police Department prioritized traffic enforcement by utilizing Patrol Officers for this when possible, resulting in a significant increase compared to the prior year. • Total moving violation citations and warnings in 2025: 6,316, up 72% from 20242 • Percent along High Injury Corridors: 70%

Traffic Stops by Race
The data below includes the
race/ethnicity as perceived by
the officer. Officers generally do
not collect self-reported
race/ethnicity unless the stop
was associated with a collision
involving injury, an arrest, or
other reportable incident/crime.

Table 7: Traffic Stops by Race, 2025

PERCEIVED RACE
% OF

TRAFFIC STOPS
White 23%
Asian 17%
Black/African American 21%
Hispanic/Latine(x) 28%
Middle Eastern or South Asian 9%
Native American 0%
Pacific Islander 1%
*Multiple 1%

STREET SAFETY CONCERN REPORTS
In 2025, community members submitted 411
reports of ongoing traffic safety concerns and
near-miss crashes at locations throughout
Alameda. The City uses the SeeClickFix app to
collect these community reports.

In 2025, staff reviewed Street Safety Concern
reports along relevant corridors when planning
and designing projects; reviewed clusters of recent
Street Safety Concern reports at monthly Vision
Zero Implementation Team meetings; and quoted
reports in grant proposals. An interactive map
showing Street Safety Concern reports is available
via the Vision Zero webpage.

Self-reported data can favor people with
resources and time, but it still gives important
insights about experiences people have on
Alameda’s streets.

2 Numbers do not include citations given by officers from partner agencies as part of PD’s participation in the Alameda County High Impact Traffic Team.

Table 8: Listed Concern Types, 2025 Street Safety Concern Reports

CONCERN TYPE
NUMBER
%
Unsafe crossing 162 39%
Other safety issue 51 12%
Speeding 76 18%
Near-miss while
walking 42 10%
Near-miss while riding
a bicycle 33 8%
Near-miss while
driving 32 8%
Blank 15 4%
TOTAL 411
Active Transportation Plan 2025 Performance Measures Report March 17, 2026, p. 1 City of Alameda

Active
Transportation
Plan
202
5 Performance Measures Report
DRAFT

City of Alameda, DRAFT March 17, 2026
Active Transportation Plan 2025 Performance Measures Report March 17, 2026, p. 2

Contents
PERFORMANCE MEASURES REPORT 3
Safety 3
Equity 3
Connectivity and Comfort 4
Community 5
Mode Shift 6
FUTURE YEAR REPORTING 7

Active Transportation Plan 2025 Performance Measures Report March 17, 2026, p. 3

PERFORMANCE MEASURES
REPORT
This is the third annual report on the Active Transportation Plan, which the Alameda City Council adopted on December 20, 2022. It reports on the performance measures listed in Table 11 of the Plan for the 202 5 calendar year. For further details on active transportation projects and programs, see the Transportation 2025 Annual Report & 2026 Work Plan.

SAFETY
Measure: Number of people walking and bicycling involved in crashes that resulted in an injury
Table 1: People walking/bicycling killed, severely injured, and injured (5-year averages)

BASELINE
TARGET
2021 2022 2023 2024 2025 2030
Walking 28 26 28 31 34 Stable, or decreasing, as the number of people walking and biking increases. Bicycling 24 23 22 26 29
Notes: Source: Alameda Police Department (2021-2025) and Statewide Integrated Traffic Records System (SWITRS, 2010-2020).

E
Q
UITY

Measure: Percent of active
transportation improvement projects
installed in equity priority
communities
11% of the 79 intersections that received active
transportation improvements in 2025 were in
equity priority areas. Improvements included new
daylighting, new or upgraded crosswalk markings,
new striped or concrete bulb-outs, and signal
improvements.
0% of the 1.69 miles of roadway that had
bikeway or other corridor improvements added
were in equity priority areas. Multiple corridor
projects are coming to equity priority areas in the
coming years, including the Willie Stargell
Complete Street Project, the Lincoln/Marshall
/Pacific Safety Project, and new Neighborhood
Greenways.

Measure: Percent of programming
and education in equity priority
communities
31% of active transportation programming and
education events and activities took place in
locations or schools in equity priority areas.

This totals 9 (out of 29) events/schools/activities,
and includes the 4 public schools in equity priority
areas that were enrolled in the Countywide Safe
Routes to Schools (SR2S) program in the 2024/25
school year (each of which held numerous events
during the school year), 3 of the bike safety
education classes, and 2 of the outreach events.

Active Transportation Plan 2025 Performance Measures Report March 17, 2026, p. 4

CONNECTIVITY AND COMFORT
Measure: Number of intersections
with pedestrian crossing
improvements or upgrades
79 intersections received improvements for
people walking. Improvements included new
daylighting, new or upgraded crosswalk markings,
new striped or concrete bulb-outs, and/or signal
improvements.

Measure: Miles of all bikeways and low
stress bikeways
Alameda added 2.1 miles of bikeways in 2025,
including 1.5 miles of low-stress bikeways, which
include Neighborhood Greenways, shared-use
paths, and separated bike lanes (also known as
“protected bike lanes”).

The City now has 61.3 miles of bikeways, of
which 41% (25.4 miles) are low-stress facilities.

Table 2: Miles of new bikeways, 2025

LOCATION

SHARED USE
PATH

SEPARATED

BIKE LANE

BICYCLE LANE

BICYCLE ROUTE

NEIGHBORHOOD

GREENWAY
Bay Trail on N. Waterfront
(Chestnut to Willow) 0.5
Central Ave
(Eighth to Sherman) 0.5
Clement Ave
(Ohlone to Grand) 0.2
Encinal Ave
(Broadway to Versailles) 0.2
Grand St
(Shore Line to Otis) 0.3
Pacific Ave
(Lafayette to Oak) 0.6
Total Miles 0.5 0.4 0.7 0 0.6

ALL BIKEWAYS ADDED IN
202
5 2.
1 Alameda added 2.1 miles of bikeways and constructed
pedestrian safety improvements at 79 intersections in 2025.

Active Transportation Plan 2025 Performance Measures Report March 17, 2026, p. 5

COMMUNITY

Measure:

Number of schools with
active Safe Routes to Schools
programs
All 18 of Alameda’s public schools were enrolled
in the Countywide Safe Routes to School (SR2S)
program1 in the 2024/25 school year. Each school
holds multiple events per year promoting getting
to school safely in a sustainable way, including
walking and biking.

Private schools can access the online resources
provided by the countywide program but cannot
enroll or sign up for services.

Table 3: Schools with SR2S programs

SCHOOL YEAR
TARGET

2022/23
2023/24
2024/25
2030
Public
Schools 17 17 18 All public
and private
schools Private
Schools unknown unknown unknown
Measure:

Number of 5
th
grade classes
that receive bicycle safety education
In the first half of 2025, Nea Community Learning
Center and Edison Elementary participated in the
City-funded bicycle safety education program.

Due to low participation rates, the City did not
renew its contract for 5 th grade bike safety
education in schools, and the program is on hiatus.

Bicycle education is available to schools via the
SR2S program.

Table 4: Schools with bike safety education workshops for 5th graders

SCHOOL YEAR
TARGET

2022/23
2023/24
2024/25
2030
Schools 0 1 2
All public and
private schools

1 https://alamedacountysr2s.org/

Measure:

Number of new or upgraded
bicycle parking facilities
At least 12 bike racks were added with new
development projects, totaling 24 new parking
spaces. All of the City’s 134 parking spaces in
shared-use electronic bike lockers were
maintained, and plans were developed to make
the lockers in the Civic Center Garage more
usable, and to move under-utilized lockers to
spaces where there is more demand. Priority
locations for 100 new racks were identified; these
racks are expected to be installed in 2026. There
are now approximately 2,320 bicycle parking
spaces in 835 racks around the city.

Measure: Number of encouragement
or educational events or campaigns
held to support walking + bicycling
13 events or campaigns were offered, either by
the City, its contractors, or the Countywide SR2S
program. These included the major annual SR2S
events, Bike to Wherever Day in May, the annual
Bike Festival, and 6 bicycle safety education
workshops.

In 2025, bicycle safety education included a
workshop on fixing a flat tire, on-bike and
classroom urban bike commuting basics classes,
and a family cycling workshop.

Active Transportation Plan 2024 Performance Measures Report March 17, 2026, p. 6

MODE SHIFT
The ATP includes six performance measures to assess trends in mode shift citywide, since no one measure can provide a complete picture. Data is available for three of these measures at this time, and the overall trend, with the limited available data in 2025, appears to show bicycling and walking modes remaining steady.

Measure: Number of people walking
and bicycling at established count
sites and recently completed capital
project locations
There are three automated counters in Alameda,
each of which continuously counts people walking
and biking on trails. One of these is owned by the
City, while the other two are owned by the East
Bay Regional Park District.

Unfortunately, in 2025, all three counters had gaps
in their bike and/or pedestrian data collected. For
the one period when all counters collected bike
data, from January to March, bicycling increased
5-14% year over year, with the highest increase on
the Cross Alameda Trail.

Table 5: Daily average number of bicyclists counted on
trails from January 1 to March 31 only

BASELINE

2023
2024
2025
Bay Farm Island,
near Bike Bridge
[not yet
installed] 466 500
Crown Memorial
State Beach, near
McKay
[not yet
installed] 154 162
Cross Alameda
Trail, near 5th St 108 138 157

Bicycle and pedestrian counts are conducted at
seven intersections in Alameda every two years by
the Alameda County Transportation Commission
(Alameda CTC) as part of their countywide
performance measures reporting. Counts were last
collected in 2024 and included in last year’s
Performance Measures Report. Since this is an off-
year and no data was collected in 2025, there are
no new trends to report.

In 2025, no before/after count data was available
for new capital projects.

Measure: Percent of people walking
and bicycling to transit
SF Bay Ferry conducted its annual passenger
survey in 2025 which included questions on how
people access the ferry terminal. Across Alameda’s
three ferry terminals, 15% walked all the way to
the terminal and 21% biked or scootered, which is
similar to 2024 data.

Across the entire Bay Area ferry system, Harbor
Bay had the highest percentage (31%) of
respondents who said they biked or scootered to
the terminal.

AC Transit collected on-board passenger data in
2025 but, as of publication, the survey findings are
not yet available.

Table 6: Percentage of passengers walking and biking to ferry terminals (202 5); Significant trends from 2024
indicated with up/down arrow.

MODE
OF
ACCESS
%

MAIN
STREET

SEAPLANE
LAGOON
HARBOR
BAY
Walk 14 ▲ 10 22 ▼
Bicycle 12 19 31 ▲
Note: “Walk” counts those who walked all the way,
not just for part of a trip. “Bicycle” includes
scootering.

Photo: SF Bay Ferry

Active Transportation Plan 2025 Performance Measures Report March 17, 2026, p. 7 Measure: Percent of bicycling and
walking trips to work, and percent of
drive alone trips to work
The latest three-year averages for commute to
work modes show walking steadily increasing,
bicycling remaining flat and driving alone
continuing to decrease. While most trips people
take are not commute-related, this is one more
data point for tracking mode shift over time.

Table 7: Percentages of people walking, bicycling and
driving alone to work (3-year averages)
MODE

BASELINE
%
TARGET
%

2021*
2022*
2023
2024
2030
Walk 2.6 2.2 2.4 3.4 4.0
Bicycle 2.4 2.6 2.9 2.8 3.6
Drive
alone 54.5 51.7 47.0 45.7 Stable or
decreasing
*Note: No data collected in 2020, so 3-year
averages skip this year. Source: American
Community Survey

FUTURE YEAR REPORTING
Three of the performance measures in the Active Transportation Plan are not included in this report, since there is not yet new data on which to report. The frequency of reporting on these measures is listed in the Plan’s Table

11. The three are:
• Percent of school-aged children who walk or bicycle to school, at least some of the time • Percent of frequent utilitarian and recreational bicyclists • Percent of frequent utilitarian walkers