Cities Index.
Exhibit 2: Proposed Master Fee Schedule - Redline

Alameda City Council
June 2, 2026

Document
Exhibit 2: Proposed Master Fee Schedule - Redline
Meeting
June 2, 2026
Body
Alameda City Council
Original file
840 KB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

CITY OF ALAMEDA

MASTER FEE SCHEDULE
Effective July 2026
EXHIBIT 2
(redline version)
Department Page #
City Clerk …................................................ 3 Finance …................................................ 3 Library …................................................ 4 Police …................................................ 5-6 Recreation and Parks …................................................ 7-12 Affordable Housing …................................................ 13 Planning & Building - Building Division …................................................ 14-16 Planning & Building - Planning Division …................................................ 17-28 Code Enforcement …................................................ 29 Fire …................................................ 30-34 Base Reuse & Economic Development …................................................ 35 Public Works …................................................ 36-39 Public Works - Parking Violations …................................................ 40-41 Development Impact Fee …................................................ 42 Cannabis …................................................ 43 Special Event Permit Fee …................................................ 44 Increased by the allowable CPI (2.5%)
Change over/under allowable CPI or New Fee
Clerical Change (Renaming fee)
No Increase (Restriced fee)
The CA Construction Cost Index (CCCI) increase rate in April 2026 was calculated at -0.5%.

The Development Impact Fees (DIF) and Affordable Housing Fees were not increased.

Table of Contents
Per Ordinance 1928, as referenced by Resolution 12191 and Resolution 14027, City fees are subject to administrative adjustments not greater than 5% annually. The February 2026 CPI is 2.5%. Therefore, except where noted, all fees have been administratively revised for a CPI rate increase of 2.5% allowed by ordinance.

Development related fees become effective 60 days after adoption purusant to Government code Section 66017.

Fire Department fees that currently do not achieve a 100% cost recovery were increased by 8.92% (excluding EMS fees and new construction fees). The 8.92% includes the allowed 2.5% Consumer Price Index (CPI) increase and a

6.42% cost recovery catch-up increase per the council-approved 7-year catch-up plan.

City of Alameda
Master Fee Schedule Table of Contents

CITY ADMINISTRATION
Staff Hourly Rates With Overhead Without Overhead
Assistant City Clerk N/A $87 Increased by 2.5% City Clerk N/A $128 Increased by 2.5%
Deputy City Clerk N/A $73 Increased by 2.5%
Subscriptions & Services Unit Fee
City Council Agenda Each $71 Increased by 2.5%
City Council Minutes Each $93 Increased by 2.5%
Passport Photos Each $26 Increased by 2.5%
Copying Fee Each $.10 per page No CPI
Marriages Unit Fee
Site Rental Each $177 Increased by 2.5%
Event Manager Each $108 Increased by 2.5%
Processing Fee Each $50 No CPI
Insurance Each $37 Increased by 2.5%
Administrative Costs Unit Fee
Returned Check Charge Each $37 Increased by 2.5%
Annual Budget Report Each $57 Increased by 2.5%
Annual Audit Report (ACFR) Each $50 Increased by 2.5%
Attachment of Wages:

Setup Fee Each $9.00 No CPI
Transaction Fee Each $2.00 No CPI
Business License & Special Assessment Listing Unit Fee
Assignment or Transfer Fee Each $44 Increased by 2.5%
Lost License Each $44 Increased by 2.5%
Application/Renewal Processing Fee Each $28 Increased by 2.5% Business License Listing Each $128 Increased by 2.5%
Business License Listing - Update Each $50 Increased by 2.5% Collection Fee on Delinquent Accounts Each $50 No CPI
Administrative Fee for Payment Plans Each $50 No CPI
Special Assessment Listing Each Year/District $128 Increased by 2.5% Attachment to Property Tax Roll for Delinquents Each $50 No CPI Penalties 10% per month up to 60% No CPI

FINANCE

CITY CLERK
City of Alameda
Master Fee Schedule 3 Administration

LIBRARY
Replacement Fees Unit Fee/Max Fine
Lost/Damaged Materials Each Replacement Cost No CPI
Replacement Cost for Mobile Hotspot Each $30.00 No CPI
Replacement Cost for Hotspot Case Each $15.00 No CPI
Replacement Cost for Hotspot Charging Cord Each $5.00 No CPI Stafford Room Unit Fee
Government Agencies Per Hour No Charge No CPI
Alameda Non-Profit Per Hour $100.00
Alameda Public Groups Per Hour $125.00
Regional or National Non-Profits Per Hour $150.00
All Library Meeting Rooms Unit Fee
Friends of the Alameda Free Library Unlimited Use No Charge No CPI City of Alameda Unlimited Use No Charge No CPI
* Groups must have open membership and meeting must be open to the public without charge. This rate also applies to for-profit businesses or other groups not covered by previous categories. (One per Month) Increased by $25.00
Increased by $50.00
Increased by $50.00
City of Alameda
Master Fee Schedule 4 Library

POLICE DEPARTMENT
Taxi Cab Permitting Unit Fee
Annual Franchise Fee Each $1,574 Increased by 2.5%
Permit T # Each $74 Increased by 2.5%
False Alarm Response Unit Fee
First Two Responses Each No Charge No CPI
3rd, 4th, and 5th Responses Each $104 Increased by 2.5% 6 or more Responses Each $209 Increased by 2.5%
Permits & Licenses Unit Fee
Carry Concealed Weapon Permit (new - all types) Each $400 No CPI Carry Concealed Weapon Permit (renewal - all types) Each $200 No CPI Dance Permit Each $100 No CPI
Firearm Dealer License Each $453 Increased by 2.5%
Police Reports and Local Records Unit Fee
Local Criminal History - Arrest Summary Each $49 Increased by 2.5% Clearance Letter Each $49 Increased by 2.5%
Crime Report Each $5.00 No CPI
Collision Report (Traffic & Investigation) Each $14 Increased by 2.5% Crime Status Report Each $49 Increased by 2.5%
Administrative Services Unit Fee
Fingerprint 1st Card Each $37 Increased by 2.5%
Each Additional Card Each $7 Increased by 2.5%
Fingerprint - Non-Certified School Employee Each $37 Increased by 2.5% Livescan - Resident Each $34 Increased by 2.5%
Livescan - Non-Resident Each $54 Increased by 2.5%
Notary Service Each $15 No CPI
Photographs on CD Each $23 Increased by 2.5%
Towed Vehicle Property Release Each $50 No CPI
Administrative Tow Fee Each $150 No CPI
Subpoena Duces Tecum (Evidence for Court) Unit Fee
Processing Fee Each $15 No CPI
Subpoenaed Civil Witness Per Subpoena Time & Material No CPI Subpoenaed Sworn or Civilian Witness Per Subpoena Time & Material No CPI Production Report Flat Fee $20.00 No CPI
Microfilm Flat Fee $50.00 No CPI
Oversized or Special Processing Per Hour $34 Increased by 2.5% Hourly Rates for Special Events With Overhead Without Overhead Police Lieutenant N/A $222 Increased by 2.5%
Police Sergeant N/A $175 Increased by 2.5%
Police Officer N/A $139 Increased by 2.5%
Pet Licensing - Alameda Animal Shelter Unit Fee
Standard License Fees
Un-Altered Animal
1 Year Each $64 Increased by 2.5%
2 Year Each $77 Increased by 2.5%
3 Year Each $90 Increased by 2.5%
Altered Animal
1 Year Each $13 Increased by 2.5%
City of Alameda
Master Fee Schedule 5 Police

POLICE DEPARTMENT
2 Year Each $19 Increased by 2.5%
3 Year Each $26 Increased by 2.5%
Senior Citizen (62+) License Fees
1 Year Each $6 Increased by 2.5%
2 Year Each $13 Increased by 2.5%
3 Year Each $19 Increased by 2.5%
Late Fees $26 Increased by 2.5%
Replacement Tag $6 Increased by 2.5%
Micro Chip $26 Increased by 2.5%
Pet Licensing - Alameda Animal Shelter Unit Fee
Adoptions (Adult)
Dog $129 Increased by 2.5%
Cat $103 Increased by 2.5%
Rabbit $64 Increased by 2.5%
Other $13 Increased by 2.5%
Adoptions (under 6 months)
Puppy $161 Increased by 2.5%
Kitten $129 Increased by 2.5%
Redemption With Current License
Cat - 1st Incident $32 Increased by 2.5%
Dog - 1st Incident $58 Increased by 2.5%
Dog - 2nd Incident $122 Increased by 2.5%
Dog - 3rd Incident $225 Increased by 2.5%
Redemption No Current License
Cat - 1st Incident $51 Increased by 2.5%
Dog - 1st Incident $116 Increased by 2.5%
Dog - 2nd Incident $161 Increased by 2.5%
Dog - 3rd Incident $257 Increased by 2.5%
Quarantine Fee
Per 10 Days $257 Increased by 2.5%
City of Alameda
Master Fee Schedule 6 Police

RECREATION AND PARKS DEPARTMENT

ATHLETIC FIELDS
Youth Organization (75% Resident) $11 / hour
Youth Organization (less than 75% Resident) $35 / hour
Private Resident $45 / hour
Private Non-Resident $68 / hour
Synthetic Turf Field - Youth Organization (75% Resident) $42 / hour Synthetic Turf Field - Youth Organization (<75% Resident) $64 / hour Synthetic Turf Field - Residents $72 / hour
Synthetic Turf Field - Non-Residents $88 / hour
Field Light Use $40 / hour + hourly fee
Camp/Tournament - Alameda Non-profit $32 / hour
Camp/Tournament - Non-Alameda Non-profit $42 / hour
Camp/Tournament Synthetic Turf Field - Alameda Non-profit $53 / hour Camp/Tournament Synthetic Turf Field - Non-Alameda Non-profit $69 / hour Field Prep - Lining for Non-Profits $130 / game
Field Prep - Lining for Private $195 / game
Field Clean-Up & Lock Up Fee (Goals & Gates) $75 per incident + hourly fee Field Prep (performed by contractor) Based on actual cost

ALAMEDA POINT GYM
Gym Tournament Security Deposit - Refundable $500 - $1,000 (depends on use) Special Event Fee $250 + hourly fee
Overtime Charge $250 / hour
Government Use $25 / hour
Youth Organization (75% resident) / Alameda Schools
Practice $39 / hour / court
League Games $47 / hour / court
Tournaments $74 / hour / court
Resident $63 / hour / court
Non-Resident Non-Profits $63 / hour / court
Non-Resident $74 / hour / court
Gym Rooms A and B (500 square feet) $35 / hour
Gym Room C (700 square feet) $50 / hour
Gym Clean-Up Fee $75 per incident + hourly fee
BOCCE BALL COURTS - 3-Hour Minimum, Except Weekdays
Resident $15 / hour
Non-Resident $18 / hour
Bocce Ball Party (ages 16+) $35 / hour
COURT FACILITIES - Tennis, Pickleball, Outdoor Basketball Per Court Rental
Resident $13 / hour
Non-Resident $18 / hour
Youth Organization (75% resident) / Alameda Schools $10 / hour Camp / Private Instruction $25 / hour
Tournament Fee $200 / day + hourly fee
City Coordinated Tournaments Fee Determined Based on Recovering Costs POOL RENTAL - 3-Hour Minimum
Government Use $26 / hour + lifeguard cost
Resident $79 / hour + lifeguard cost
Non-Resident $110 / hour + lifeguard cost
Resident Youth Teams (75% Alameda Participants) $9.50 / hour / lane Resident Adult Teams (75% Alameda Participants) $12.50 / hour / lane Non-Resident Youth Teams $25 / hour /lane
City of Alameda
Master Fee Schedule 7 ARPD

RECREATION AND PARKS DEPARTMENT
Non-Resident Adult Teams $30 / hour /lane
Lifeguard Fee - Resident $25 / hour / per lifeguard
Lifeguard Fee - Non-Resident $30 / hour / per lifeguard City Swim Championships Fee Determined Based on Recovering Costs + Admin Costs

PARK & PICNIC RENTAL
Still Photography Photo Shoot $300 / day + hourly facility rental Live Film Shoot (In Addition to Other Use Fees) - Educational $260 / day + hourly facility rental Live Film Shoot (In Addition to Other Use Fees) - Commercial $1,000 half day / $1,500 full day + rental Outside Vendors (ex: inflatable jumpers, Legos, games) $30 per day / vendor Park Open Space Use Fee $43 / hour
Park Outdoor Stage/Gazebo $35 / hour
Outside Contractor Park Use (range varies due to frequency) $250 - $400 Yearly + Liability Insurance Electricity Use, Inflatables, etc. $25 / day
End of School Year Picnic Rental / Alameda Schools Only $30/ day / classroom Large Group (100+) Event Cleaning Fee $55 R / $75 NR / hour Special Event Open Space Usage Fee $300 / hour (additional charges may apply) Picnic Areas Resident & Alameda Non-Profit (3-hour min.) Small Area (1 - 2 tables) $37 / hour
Medium Area (3 - 4 tables) $58 / hour
Large Area (5+ tables) $89 / hour
Picnic Areas Non-Resident & Non-Alameda Non-Profit (3-hr min) Small Area (1 - 2 tables) $61 / hour
Medium Area (3 - 4 tables) $94 / hour
Large Area (5+ tables) $149 / hour
FACILITY RENTAL - 3-Hour Minimum
Non-Active Military Personnel Discount - Resident 10% discount Active Military Personnel Discount - Resident 10% discount Public Boat Launch Facility Event Permit
Non-Profit Organizations $200 / day
Additional Fees for Recreation Centers and Veteran's Building Refundable Cleaning and Security Deposit $300 / permit
Refundable Cleaning and Security Deposit With Alcohol/Outside Vendors/Commercial
$500 / permit
Alcohol Permit At Cost Per Outside Insurance Provider
Commercial Fund-Raising $130 / hour
Alameda Business / HOA Meeting Rate $50 / hour
Non-Alameda Business / HOA Meeting Rate $65 / hour
Veteran's Building
Resident - Room 390 $75 / hour
Resident - Main Room $95 / hour
Resident - Room 120 $95 / hour
Non-Resident - Room 390 $100 / hour
Non-Resident - Main Room $120 / hour
Non-Resident - Room 120 $120 / hour
Bayport, Leydecker, Krusi and Washington Park Centers
Alameda Non-Profit $75 / hour
Resident $100 / hour
Non Resident $132 / hour
City of Alameda
Master Fee Schedule 8 ARPD

RECREATION AND PARKS DEPARTMENT
Lincoln Park (Harrison) Recreation Center
Alameda Non-Profit $99 / hour
Resident $132 / hour
Non-Resident $182 / hour
Concession Stand Use
Non-Profit $15 / hour
Resident $20 / hour
Non-Resident $30 / hour
O'CLUB RENTAL - 4-Hour Minimum
Actual costs that exceed security deposit will be charged Actual cost Security Deposit - Refundable - Without Alcohol Permit $750 without alcohol permit Security Deposit - Refundable - With Alcohol Permit $1,500 with alcohol permit Event Security Staff At Cost Per Outside Provider
O'Club Cancellation Fee $100 per rental
Alcohol Permit At Cost Per Outside Insurance Provider
Government Use $25 / hour
Kitchen Use Fee Included in fee for Event Set up/ Cleaning Crab Feed Additional Cleaning fee $275 / event
Holiday Event Rental Regular rate + 15%
Saturday Event Rental Regular rate + 15%
Garden Set Up $150 / event + actual cost for chair rental Kitchen Use, Event Set Up & Clean Up including Table/Chair Rental $425 / event Alameda Non-Profit Organizations and Schools
Main Room $155 / hour
Trident Room $135 / hour
Terrace Room $110 / hour
Squadron Room $75 / hour
Alameda Resident
Main Room $195 / hour
Trident Room $165 / hour
Terrace Room $135 / hour
Squadron Room $85 / hour
Non-Resident and Non-Alameda Non-Profits
Main Room $264 / hour
Trident Room $225 / hour
Terrace Room $188 / hour
Squadron Room $115 / hour

AQUATICS
Group Swim Lessons, all ages, 30 minutes
Resident $13 / lesson
Non-Resident $15 / lesson
Semi-Private Swim Lessons, ages 3-15, 30 minutes
Resident $32 / lesson
Non-Resident $39 / lesson
Private Swim Lessons, ages 3-15, 30 minutes
Resident $50 / lesson
Non-Resident $55 / lesson
Public Swim/Lap Swim/Water Walking
Youth Resident $3 / visit
Youth Non-Resident $4 / visit
Adult Resident (18 - 49) $5 / visit
City of Alameda
Master Fee Schedule 9 ARPD

RECREATION AND PARKS DEPARTMENT
Adult Non-Resident (18- 49) $6 / visit
Senior (50 +) Resident $3 / visit
Senior (50 +) Non-Resident $4 / visit
Aqua Fitness Classes
Resident $6 / visit
Non-Resident $7 / visit
Senior( 50+) Resident $5 / visit
Senior (50+) Non-Resident $6 / visit
Swim Pass 10% discount
Specialty Aquatic Classes / Camp Based on instructor and/or contract fee Specialty Aquatic Classes / Camp Materials based on actual cost of materials

YOUTH SPORTS
Sports Leagues, Camps, and Special Programs Based on instructor and/or contract

ADULT SPORTS
Leagues with 1 Officials
Resident Team $78 / game
Non-Resident Team $90 / game
Leagues with 2 Officials
Resident Team $88 / game
Non-Resident Team $100 / game
Adult Sports Tournaments Actual costs + 20%
Leagues with 3 Officials
Resident Team $98 / game
Non-Resident Team $111 / game
Adult Sports Tournaments Actual costs + 20%
Open Gym
Resident $10 / session
Gym Pass Discount 10%

TENNIS LESSONS
Group Lessons
Resident $25 / lesson / hour
Non-Resident $30 / lesson / hour
Private Lessons
Resident $53 / lesson / hour
Non-Resident $64 / lesson / hour
Semi Private Lessons (2 people)
Resident $68 / lesson / hour
Non-Resident $78 / lesson / hour

CLASSES
Adult and Youth Classes and Camps 25% - 40% of total Instructor Fee Administrative Fee - Mastick Senior Center $3 or 3% whichever is greater Administrative Fee 3%-5% of class cost
Materials Fee Based on actual cost

MASTICK SENIOR CENTER
Actual costs that exceed security deposit will be charged Actual cost Bingo Program
Bingo Game Prices $0.25 - $8
Snack Bar $1 - $10
Classes
Drop-In Classes Fee Determined Based on Recovering Costs Term Classes 25% of Total Instructor Fee
Facility Rental - Social Hall - 4-Hour Minimum
City of Alameda
Master Fee Schedule 10 ARPD

RECREATION AND PARKS DEPARTMENT
Resident $180 / hour
Non-Resident $205 / hour
Non-Profit $105 / hour
Large TV Use $50 / event
Commercial Kitchen Use - Resident $75 / hour
Commercial Kitchen Use - Non-Resident $100 / hour
Security Deposit (Refundable) $500
Facility Rental - Classroom - 2-Hour Minimum
Alameda Non-Profit Organization $60 / hour
Non-Alameda Non-Profit Organization $70 / hour
Resident - Room A $75 / hour
Resident - Dining Room 1 $95 / hour
Resident - Dining Room 2 $95 / hour
Resident - Room D $95 / hour
Non-Resident - Room A $90 / hour
Non-Resident - Dining Room 1 $114 / hour
Non-Resident - Dining Room 2 $114 / hour
Non-Resident - Room D $114 / hour
Security Deposit (Refundable) $250
Custodial Fees $25 / event of $50 / event over 200 guests Additional Fees
Vendor Table Rental - Non-Profit Varies by item
Vendor Table Rental - Private Varies by item
Thrift Shop Varies by Item
Travel Program Varies by Trip
Special Events Fee Determined Based on Recovering Costs Art Program Sales 15% of fee
Fundraiser Sales Varies by item
Computer Lab Printing $.15 - $.85 / page

YOUTH PROGRAMS
Tiny Tots*
Program Fees (School Year & Summer) $9.50 / hour R / $11 hour NR TK Fee for Non-School Day Camp $7.13 / hour R / $8.40 hour NR Wee Play $6 / day or $60 Drop-In Card for 12 Visits
RAP - Recreation Afterschool Program* $5.41 / hour R / $6.49 / hour NR Additional Day $25 / day
Early Dismissal $27 - $182
WOW - World of Wonder Summer Camp
5 Days $294 R / $353 NR
4 Days $235 R / $267 NR
WOW Extended Care $85 - $192 R / $115 - $234 NR
Day Camp
Hidden Cove - Per Week $258 R / $309 NR
Hidden Cove - 4 Day Week $206 R / $251 NR
Trails End & Trailblazers - Per Week $350 R / $422 NR
Teen/Tween Adventure Camp
Resident $273 - $459 / week
Non-Resident $329 - $554 / week
Teen Programs
Club Underground Transportation $2 / youth / one-way trip Operation Greensweep $50 / session
Leader in Training half day $30 / week R / $40 / week NR City of Alameda
Master Fee Schedule 11 ARPD

RECREATION AND PARKS DEPARTMENT
Leader In Training full day $60 / week R / $70 / week NR Alameda Youth Committee $50 / year R / $60 / week NR
Additional Programs/Fees
Per Hour Charge for Other Youth Programs $5.95 R / $6.92 NR Non-Refundable RAP and Tiny Tot Registration Deposit $50 Non-School Extended Care $20 / day R, $30 / day - NR
Split Payment Fee $30 per transaction
Field Trips & Program Activities Based on Activity Costs Special Events : Parties, Movies, Theme Days , etc. Based on Activity Costs Santa's Visit - Virtual and In-Person $30 - $50 / visit Breakfast with Santa
Resident $35 Adult / $15 Child
Non-Resident $40 Adult / $20 Child
Late Pick-Up Charges $1 / minute for all youth classes per child Transportation $10 - $30 based on location/stops
Program Transportation Fee Fee determined based on cost from Vendor Scholarships (Non-Contract Programs) Fees reduced by 25% - 75% based on need Program Marketing Discounts
Early Bird 10% off of activity cost
Bring a Friend $15 - $25 voucher issued, based on total fee School-year programs marked with an asterisk (*) and are effective at the new school year in August

ADMINISTRATION FEES
City-Approved Holiday and Associated Weekend Rental Fee Regular rate + 15% Supply Fees Based on Supply Costs
Receipt Printing $5 Each
Late/Transfer/Cancellation Fee $20 + all non-refundable costs Admin Fee for Revising Facility Permits $25
Portable Toilet Fee At cost from Vendor + Admin fee
Storage Units in Parks (must be tied to an allocation)
Knack Box $50 / year
Shed $100 / year
20 ft Shipping Container $150 / year
Community Events
Booth Fee $50 for Non-Profit / $200 for Profit
Food Booth/Truck Fee $350
Event Admission $5 - $35 per person
Equipment Rental Actual Cost
Actual costs that exceed security deposti will be charged directly Actual Cost Lost or Damaged Material at Deparment Cost, Department to Pick Up, No Delivery Included
Actual Cost + Hourly Rate
Battery Rental $250 / event (City-issued permit required) Wheelchair Lift $1,000 / event (City-issued permit required) Security Deposit for Equipment (refundable) $500
R = Alameda Resident
NR = Non-Alameda Resident
City of Alameda
Master Fee Schedule 12 ARPD

AFFORDABLE HOUSING FEES
Use Type* # of Housing Units Per Square Feet Fee Per Square Feet Retail 9 100,000 s/f $3.51
Office 20 100,000 s/f $6.91
Warehouse 4 100,000 s/f $1.20
Manufacturing 4 100,000 s/f $1.20
Hotel/Motel 5 100 room/suite $1,474 (room/suite)
Affordable Housing Unit Fee Program Deposit Fee
Application for Fee Adjustment $750 Time & Material No CPI Appeal of Fee Decision $1,000 Time & Material No CPI
Inclusionary Housing Fees Unit Fee
Affordable Housing Agreement Fee Per Document $2,500 No CPI Citywide Inclusionary Fee Per Residential Unit $28,149
(Fee in-lieu of construction for nine or fewer units)
Subordination Fee Per Document $300 No CPI
Other Fees Unit Fee
Reconveyance Fee Per Document $45 No CPI
* Work/Live units defined in AMC 30-15 shall be subject to the Warehouse or Manufacturing rate, whichever is less.

Goes to council
on 5/19
City of Alameda
Master Fee Schedule 13 Affordable Housing

PLANNING
Fee Name Note Minimum
Activity Fee Filing Fee Technology Fee Community
Planning Fee Deposit Total
Ministerial Review for State Bill Housing Projects
Ministerial Review Application - for applications subject to ministerial Planning review under state law. $ 3,890.90 $ 97.38 $ 239.30 $ 19.94 $ 4,247.51 Increased by 2.5% Note: Deposit required when a subdivison map is part of the project. $ 2,936.63 $ 2,936.63 Increased by 2.5%
Appeals
Appeal/Call for Review to Planning Board or City Council - Single Family Residential and Multi-family Residential Less than 5 Units 1 1,467.80$ $ 733.90 $ 2,201.70 Increased by 2.5% Appeal/Call for Review to Planning Board or City Council – Multi-Family Residential 5 Units or More/Commercial/ Industrial
1 1,467.80$ $ 733.90 $ 2,201.70 Increased by 2.5% Zoning Change/General Plan Amendment
Amendments to the General Plan Text or Land Use Diagram 2 Actual Cost $ 97.38 $ 1,415.36 $ 117.95 $ 21,861.29 $ 23,491.98 Increased by 2.5% Property Rezoning or Zoning Code Amendment 2 Actual Cost $ 97.38 $ 1,415.36 $ 117.95 $ 21,861.29 $ 23,491.98 Increased by 2.5% Design Review Exemptions
Design Review Exemption: Minor Alterations - this fee applies to Minor Alterations under the Design Review Ordinance (AMC 30-37) that are exempt from Design Review pursuant to AMC 30-37.2.b. Common examples include window and door replacements not removing character- defining features, siding repair and replacement, and other in-kind improvements. This fee does not apply to work that does not require a building permit as they are not subject to the Design Review Ordinance. 5 146.58$ $ 146.58
Increased by 2.5%
Design Review Exempt: Additions - this fee applies to building additions and related improvements regulated under the Design Review Ordinance (AMC 30-37) that are exempt from Design Review pursuant to AMC 30-

37.2.b. Common examples include single-story rear additions or additions to accessory structures that are less than 1,200 sf in size. 5 880.48$ $ 880.48
Increased by 2.5%
Design Review Exemption: Wireless Eligible Facilities Requests and Small Cell Wireless review
5 587.33$ $ 587.33
Increased by 2.5%
Design Review: Alterations/Additions
Design Review: Minor Alterations - this fee applies to alterations involving minor changes in floor area or the building footprint on the ground floor that is less than 50 sf in area. Common examples include porches, stairwells, windows, stairs, doors, water heater closets, and siding that require Design Review under AMC 30-37. This fee applies to decks that require Design Review.
3 880.48$ 97.38$ 58.67$ 5.13$ -$ $ 1,041.65 Increased by 2.5%
Design Review: Accessory Buildings/Structures - the fee applies to additions and alterations to accessory buildings and structures not exempt from Design Review pursuant to AMC 30-37.2.b.
3 2,055.13$ 97.38$ 129.15$ 10.76$ -$ $ 2,292.41 Increased by 2.5%
Design Review: Additions - this fee applies to additions and alterations not exempt from Design Review pursuant to AMC 30-37.2.b. Common examples include second story additions, lifting a building, public facing additions, single story additions over 1,200 sf, and modifications to architecturally unique windows, doors and other features. 3 3,890.90$ 97.38$ 239.30$ 19.94$ -$ $ 4,247.51 Increased by 2.5%
Design Review: New Construction
Design Review: New Construction - Accessory Building 3 2,055.13$ 97.38$ 129.15$ 10.76$ -$ $ 2,292.41 Increased by 2.5% Design Review: New Construction - Detached Single-Family Dwelling or Duplex
3 3,890.90$ 97.38$ 239.30$ 19.94$ -$ $ 4,247.51 Increased by 2.5% Design Review: New Construction- Multi-family Buildings 3-9 units 1 3,890.90$ 97.38$ 239.30$ 34.14$ 2,936.63$ $ 7,198.33 Increased by 2.5% Design Review: New Construction - Multi-family buildings 10+ units or more and any Non-Residential or Mixed Use Buildings 1 7,635.23$ 97.38$ 463.96$ 52.86$ 2,936.63$ $ 11,186.04 Increased by 2.5% Changes to Approved Design Review
Changes to Approved Design Review - Review by Planning Director minimum fee per hour 293.15$ $ 293.15 Increased by 2.5% Changes to Approved Design Review - Review by Planning Board 1 3,890.90$ 97.38$ 239.30$ 19.45$ -$ $ 4,247.03 Increased by 2.5% Historic Preservation
Changes to Historical Building Study List (HBSL) /Monument Designation Status - this fee applies to requests to add, delete or modify items on the HBSL and/or the Historic Monument list. The fees includes staff review of any technical historic evaluation reports to be provided by the applicant. 1 Actual Cost $ 97.38 $ 520.47 $ 43.38 $ 7,915.98 $ 8,577.20 Increased by 2.5%
Certificate of Approval and Hearing by the Historical Advisory Board (HAB) 1 $ 4,404.43 $ 97.38 $ 270.11 $ 22.51 $ - $ 4,794.42 Increased by 2.5% Certificate of Approval - Demolition of an Accessory Building on a Listed Property $ 1,467.80 $ 97.38 $ 93.91 $ 7.83 $ - $ 1,666.91 Increased by 2.5% Certificate of Approval with ADU - Demo of Accessory Building Concurrent with an ADU Application $ 1,028.08 $ 97.38 $ 67.53 $ 5.63 $ - $ 1,198.60 Increased by 2.5% Protected Tree Removals
Certificate of Approval - Removal of Protected Tree pursuant to AMC 13-

21.7. Note: Requires deposit of Tree Replacement In-Lieu Fee at the time of application.
440.75$ 97.38$ 32.29$ 5.13$ -$ $ 575.54 Increased by 2.5%
Tree Replacement In-Lieu Fee per AMC 13-21.7 ($750 per tree) - this fee deposit is refundable upon proof of planting for the replacement tree. -$ -$ -$ -$ 1,537.50$ $ 1,537.50 Increased by 2.5% Certificate of Approval - Dead/Fallen Tree - this fee applies to trees that are dead or have fallen due to disease or natural disasters and causes. 113.78$ -$ -$ -$ -$ $ 113.78 Increased by 2.5%
Sign Permits per AMC 30-6.3
City of Alameda
Master Fee Schedule 14 Planning Fees

PLANNING
Fee Name Note Minimum
Activity Fee Filing Fee Technology Fee Community
Planning Fee Deposit Total
Sign Permit - Permanent Signs - Every Two (2) Signs. Note: Fee is added to the Building Permit Fees invoice where a building permit is required. 220.38$ $ 220.38 Increased by 2.5% Clerical Change Sign Program / Amendment to Existing Sign Program. Note: other deposit applies if a public hearing is required
2,055.13$ 97.38$ 107.63$ 22.02$ 2,349.30$ $ 4,631.45 Increased by 2.5% Corporate Street Naming
Corporate Street Naming per City Street Naming Policy 2 8,809.88$ 97.38$ 534.44$ 44.54$ -$ $ 9,486.22 Increased by 2.5% Use Permits or Variance/Amendment
Use Permit or Variance/Amendment 1 3,303.58$ 97.38$ 204.06$ 16.52$ -$ $ 3,621.52 Increased by 2.5% Public Convenience and Necessity (PCN) Determination 293.15$ 97.38$ 23.43$ 5.13$ -$ $ 419.08 Increased by 2.5% Note: If public hearing required 2,349.30$ $ 2,349.30 Increased by 2.5% Time Extension
Extension of approved entitlement not vested (variance, design review, use permit)
146.58$ 97.38$ 14.64$ 5.13$ -$ $ 263.71 Increased by 2.5% Extension with Public Hearing 1 2,349.30$ 97.38$ 146.80$ 11.75$ -$ $ 2,605.22 Increased by 2.5% Preliminary Review Applications
Preliminary Review Meeting - First Meeting (no charge) $ - $ - Each Additional Meeting $ 293.15 $ 293.15 Increased by 2.5% Prelim - Planning Only Review $ 440.75 $ 97.38 $ 32.29 $ 5.13 $ - $ 575.54 Increased by 2.5% Review by Each Additional City Department $ 293.15 $ 293.15 Increased by 2.5% Prelim - Review by Interdepartmental Development Review Team (DRT) $ 2,055.13 $ 97.38 $ 129.15 $ 10.76 $ - $ 2,292.41 Increased by 2.5% SB 330 and other preliminary applications under state law $ 3,964.70 $ 97.38 $ 243.72 $ 20.31 $ 1,467.80 $ 5,793.91 Increased by 2.5% Master Plans, Planned Development (PDs), and Development Plans Master Plan / Planned Development / Amendment - this fee applies to all development proposals that requires either a Master Plan and/or compliance with the Planned Development regulations of AMC 30-4.13, and/or subsequent amendments.
1 Actual Cost $ - $ - $ - $ 15,790.13 $ 15,790.13 Increased by 2.5%
Development Plan / Amendment - this fee applies to all development proposals subject to submittal of a Development Plan.
1 Actual Cost $ - $ - $ - $ 15,790.13 $ 15,790.13 Increased by 2.5%
Density Bonus
Density Bonus Application 2 Actual Cost $ 97.38 $ 403.75 $ 33.65 $ 6,096.99 $ 6,631.75 Increased by 2.5% Density Bonus Application for 100% Affordable Housing (no charge) -$ $ - Development Agreements and Other Project Agreements
New Development Agreement or Major Amendment 2 Actual Cost $ 97.38 $ 1,269.05 $ 105.76 $ 19,581.32 $ 21,053.50 Increased by 2.5% Annual Review of Development Agreement 1 879.45$ 97.38$ 58.61$ 5.13$ -$ $ 1,040.56 Increased by 2.5% Performance Agreement (landscaping installation, maintenance, mitigation monitoring, subdivision improvements, public art, etc.) Actual Cost 97.38$ 358.24$ 29.86$ 5,387.79$ $ 5,873.25 Increased by 2.5%
Subdivision Map Act
Lot Line Adjustment (includes 2 reviews). Note: For Public Works review fees see PW Fee Schedule
733.90$ 97.38$ 49.88$ 18.35$ 2,936.63$ $ 3,836.13 Increased by 2.5% Parcel Map (up to 4 lots) / Amendment. Note: For Public Works review fees see PW Fee Schedule
Actual Cost 97.38$ 710.63$ 59.22$ 10,879.28$ $ 11,746.50 Increased by 2.5% Tentative Subdivision (Tract) Map (>5 lots) / Amendment. Note: For Public Works review fees see PW Fee Schedule
2 Actual Cost 97.38$ 886.83$ 73.90$ 13,625.02$ $ 14,683.13 Increased by 2.5% Non-Residential Condo Conversions 1 Actual Cost 97.38$ 710.63$ 59.22$ 10,879.28$ $ 11,746.50 Increased by 2.5% Residential Condo Conversions 1 Actual Cost 97.38$ 710.63$ 59.22$ 10,879.28$ $ 11,746.50 Increased by 2.5% Certificate of Compliance 733.90$ 97.38$ 49.88$ 5.13$ 1,467.80$ $ 2,354.08 Increased by 2.5% Environmental Review
CEQA Exemption with Initial Study / Technical Reports 8,809.88$ 97.38$ 534.44$ 44.05$ -$ $ 9,485.73 Increased by 2.5% Environmental Document - IS/ND/MND plus additional deposit based on consultant estimate)
Actual Cost 97.38$ 1,063.03$ 88.59$ 16,370.77$ $ 17,619.75 Increased by 2.5% Environmental Document - EIR (plus additional deposit based on consultant estimate and direct cost)
2 Actual Cost 97.38$ 1,767.76$ 147.31$ 27,352.78$ $ 29,365.23 Increased by 2.5% Other environmental review tasks not specified (per hour) 293.15$ -$ $ 293.15 Increased by 2.5% Business License/Zoning Approvals
Work/Live Permit Per AMC 30-15.5(b) 146.58$ 97.38$ 14.64$ 5.13$ -$ $ 263.71 Increased by 2.5% Home Occupation Permit 146.58$ 97.38$ 14.64$ 5.13$ -$ $ 263.71 Increased by 2.5% Zoning Clearance 9 146.58$ 97.38$ 14.64$ 5.13$ -$ $ 263.71 Increased by 2.5% Added Note Building Permit Plan Check/Site Inspection
Planning - Building Plan Review (Minor Projects) 5 $ 293.15 $ 293.15 Increased by 2.5% Planning - Building Plan Review (Major Projects) 5 $ 880.48 $ 880.48 Increased by 2.5% Planning - Each Inspection 5 $ 293.15 $ 293.15 Increased by 2.5% Zoning Determinations and Research
Zoning Verification Letter - City Letter with Zoning Information requiring no property research $ 219.86 $ - $ 13.19 $ 5.13 $ - $ 238.18 Increased by 2.5%
Zoning Compliance Determination - City letter with zoning information requiring property research, conformance review with approved plans, nonconforming use certificates, and other determinations of compliance with the Zoning Ordinance. This fee also applies to specified Planning Director approvals per the Zoning Ordinance.
$ 880.48 $ 97.38 $ 58.67 $ 5.13 $ - $ 1,041.65 Increased by 2.5%
Miscellaneous Fees
Public Hearing/Study Sessions - Board/Commissions or City Council - This fee applies to public hearings, study sessions, and community meetings held by Boards, Commissions, or the City Council beyond those routinely required as part of the standard review process.
1 $ 2,349.30 $ 2,349.30
Increased by 2.5%
Massage Tech Permit pursuant to AMC 6-46 $ 146.58 $ 97.38 $ 14.64 $ 5.13 $ - $ 263.71 Increased by 2.5% City of Alameda
Master Fee Schedule 15 Planning Fees

PLANNING
Fee Name Note Minimum
Activity Fee Filing Fee Technology Fee Community
Planning Fee Deposit Total
Planning Services Hourly Rate $ 293.15 $ 293.15 Increased by 2.5% Meeting with a Project Planner Hourly Rate (available upon request) $ 293.15 $ 293.15 Increased by 2.5%
Processing Fee for each recorded document $ 1,174.65 $ 1,174.65 Increased by 2.5% Filing Fee 6 $ 97.38 $ 97.38 Increased by 2.5% Technology Fee 7
Percent of
Permit Activity
Fees
6% of Applicable
P
ermit Activity
Fees
Clerical Change
Community Planning Fee 8 Percent of
Valuation

0.5% of Job
Valuation
For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers, if required, to process the specific application. $ 293 per hour $ 293 per hour
Increased by 2.5%
Clerical Change -
Added new note
1 Fee includes 1 public hearing and required legal ad and public notice. 2 Fee includes 2 public hearings and required legal ads and public notice. 3 Fee includes a 100 ft. public notice.
4 No charge when combined with another entitlement
5 Fee is added to Building Permit fee invoice.
6 Filing Fee is applied to each project.
7 Technology Fee = 6% of activity fee and filing fee.
8 Community Planning Fee = 0.5% of Construction Valuation. Minimum $5 added to all applications. When construction valuation is unavailable during Planning entitlements phase, valuation shall be calculated based on the sum of the Planning activity fee and filing fee. 9 The Planning Director is authorized to waive the Zoning Clearance fee in support of economic development.

Notes: (Also see Public Works Fees for Applicable Fees Charged to Planning Applications) City of Alameda
Master Fee Schedule 16 Planning Fees

BUILDING
Fee No. Fee Name
Notes
Base Fee Incremental Fee
3,972$ Plus $0.62 per sq ft over 2,000 Increased by 2.5% 8,937$ Plus $0.15 per sq ft over 10,000 Increased by 2.5% 14,896$ Plus $0.29 per sq ft over 50,000 Increased by 2.5% 3,972$ Plus $0.93 per sq ft over 2,000 Increased by 2.5% 11,420$ Plus $0.21 per sq ft over 10,000 Increased by 2.5% 19,861$ Plus $0.19 per sq ft over 50,000 Increased by 2.5% 29,791$ Plus $0.29 per sq ft over 2,000 Increased by 2.5% 2,979$ Plus $0.62 per sq ft over 2,000 Increased by 2.5% 7,944$ Plus $0.11 per sq ft over 10,000 Increased by 2.5% 12,413$ Plus $0.24 per sq ft over 50,000 Increased by 2.5% 1,986$ Plus $0.24 per sq ft over 2,000 Increased by 2.5% 3,972$ Plus $0.10 per sq ft over 10,000 Increased by 2.5% 7,944$ Plus $0.16 per sq ft over 50,000 Increased by 2.5% 1,738$ Plus $0.24 per sq ft over 2,000 Increased by 2.5% 3,724$ Plus $0.10 per sq ft over 10,000 Increased by 2.5% 7,696$ Plus $0.15 per sq ft over 50,000 Increased by 2.5% 1,986$ Plus $0.66 per sq ft over 1,000 Increased by 2.5% 3,972$ Plus $0.49 per sq ft over 4,000 Increased by 2.5% 5,958$ Plus $0.74 per sq ft over 8,000 Increased by 2.5% 7 Residential Repeat / Subsequent Lot up to 1,000 square feet for larger homes the fee will be 50% of the full Plan Check fee. 993$ See fee note on the description Increased by 2.5% 993$ Plus $1.24 per sq ft over 200 Increased by 2.5% 1,986$ Plus $1.98 per sq ft over 1,000 Increased by 2.5% 3,972$ Plus $1.98 per sq ft over 2,000 Increased by 2.5% 497$ Plus $0.62 per sq ft over 200 Increased by 2.5% 993$ Plus $0.99 per sq ft over 1,000 Increased by 2.5% 1,986$ Plus $0.99 per sq ft over 2,000 Increased by 2.5%

OTHER APPLICABLE FEES
PLAN CHECK: NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS NOTE : For Construction Types I - II and III, a 20% fee will be added due to the complexity 1 Commercial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule)
2 Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule)
3 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 4 Commercial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered)
5 Commercial Tenant Improvement - Non Structural - (Non- structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered)
6 Single Family Dwellings - (All newly constructed space for residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project)
8 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)
9 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)
City of Alameda
Master Fee Schedule 17 Building Fees

BUILDING
Fee No. Fee Name
Notes
Base Fee Incremental Fee
PLAN CHECK: NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS NOTE : For Construction Types I - II and III, a 20% fee will be added due to the complexity 10 Community Planning Fee [3]

0.5% of
construction job
valuation,
minimum $5,
applies to all
permits
11 Technology Fee [2] 6% of applicable
permit activity fees Clerical Change
12 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass- through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
hourly $248
Increased by 2.5%
[Notes]
[1] Processing Fee is applicable to all permits.
[2]
[3]
[4] Fee set by Alameda Municipal Power.
[5]
Technology Fee: 6% fee applies to all applicable filing, permit and inspection fees and any additional activity fees. Does not apply to state fees, community planning fee, improvement tax, school fees, development impact fees.

Community Planning Fee: 0.5% of construction job valuation, minimum $5, applies to all permits.

Fees do not include charges by the Fire Department, Alameda Municipal Power, Planning, and/or Public Works.

City of Alameda
Master Fee Schedule 18 Building Fees

BUILDING
Fee No. Fee Name
Notes
Square
Footage Base Fee Incremental Fee
2,000 3,972$ Plus $0.75 per sq ft over 2,000 Increased by 2.5% 10,000 9,930$ Plus $0.37 per sq ft over 10,000 Increased by 2.5% 50,000 24,826$ Plus $0.49 per sq ft over 50,000 Increased by 2.5% 2,000 4,469$ Plus $1.61 per sq ft over 2,000 Increased by 2.5% 10,000 17,378$ Plus $0.66 per sq ft over 10,000 Increased by 2.5% 50,000 43,446$ Plus $0.23 per sq ft over 50,000 Increased by 2.5% 100,000 54,617$ Plus $0.54 per sq ft over 2,000 Increased by 2.5% 2,000 3,972$ Plus $0.49 per sq ft over 2,000 Increased by 2.5% 10,000 7,944$ Plus $0.24 per sq ft over 10,000 Increased by 2.5% 50,000 17,378$ Plus $0.35 per sq ft over 50,000 Increased by 2.5% 2,000 2,483$ Plus $0.31 per sq ft over 2,000 Increased by 2.5% 10,000 4,965$ Plus $0.10 per sq ft over 10,000 Increased by 2.5% 50,000 8,937$ Plus $0.17 per sq ft over 50,000 Increased by 2.5% 2,000 2,234$ Plus $0.22 per sq ft over 2,000 Increased by 2.5% 10,000 3,972$ Plus $0.10 per sq ft over 10,000 Increased by 2.5% 50,000 7,944$ Plus $0.16 per sq ft over 50,000 Increased by 2.5% 1,000 3,724$ Plus $0.41 per sq ft over 1,000 Increased by 2.5% 4,000 4,965$ Plus $0.49 per sq ft over 4,000 Increased by 2.5% 8,000 6,951$ Plus $0.87 per sq ft over 8,000 Increased by 2.5% 200 1,490$ Plus $1.87 per sq ft over 200 Increased by 2.5% 1,000 2,979$ Plus $0.99 per sq ft over 1,000 Increased by 2.5% 2,000 3,972$ Plus $1.99 per sq ft over 2,000 Increased by 2.5% 200 993$ Plus $1.87 per sq ft over 200 Increased by 2.5% 1,000 2,483$ Plus $0.99 per sq ft over 1,000 Increased by 2.5% 2,000 3,476$ Plus $1.74 per sq ft over 2,000 Increased by 2.5%

AMP FEES
Alameda Municipal Power Service Connect/Disconnect Fee (Overhead or Underground)
[4]
During work hours
After work hours

OTHER APPLICABLE FEES
10 Technology Fee
[2] percent of
permit
6% of
Applicable
Activity Fees
INSPECTION: NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS NOTE : For Construction Types I - II and III, a 20% fee will be added due to the complexity 1 Commercial Uses - Structural (All newly constructed or added space for non- residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule)
2 Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule)
3 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable)
4 Commercial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered)
5 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 6 Single Family Dwellings - (All newly constructed space for residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project)
7 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)
8 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)
9 City of Alameda
Master Fee Schedule 19 Inspection Fees

BUILDING
Fee No. Fee Name
Notes
Square
Footage Base Fee Incremental Fee
INSPECTION: NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS NOTE : For Construction Types I - II and III, a 20% fee will be added due to the complexity 11 Community Planning Fee [3] percent of
valuation
.5% of Job
Valuation
12 Improvement Tax (applies only on permits with valuation over $5,000. ADU's and Alameda Housing Authority Development Projects are Exempt) NON-CITY FEES (Required by State Law)
Building Standards Fee - Fee Set by State
14 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
hourly $248 Increased by 2.5%
[Notes]
[1] Processing Fee is applicable to all permits.
[2] Clerical Change -
Description
[3]
[4] Fee set by Alameda Municipal Power.
[5]
13 Strong Motion Instrumentation Program (SMIP) - Set by State School Fees (Alameda Unified School District) - Set by AUSD 14 DEVELOPMENT IMPACT FEES - as applicable
See DIF section
Fees do not include charges by the Fire Department, Alameda Municipal Power, Planning, and/or Public Works. 15 AFFORDABLE HOUSING FEES FOR NON-RESIDENTIAL DEVELOPMENT - as applicable See Affordable Housing Fees section
16 INCLUSIONARY HOUSING FEES - as applicable
See Affordable Housing Fees section
Clerical Change -
Removing item
Clerical Change -
Removing item
Clerical Change -
Removing item
Technology Fee: 6% fee applies to all applicable filing, permit and inspection fees and any additonal activity fees. Does not apply to state fees, community planning fee, improvement tax, school fees, development impact fees.

Community Planning Fee: 0.5% of construction job valuation, minimum $5, applies to all permits.

City of Alameda
Master Fee Schedule 20 Inspection Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check SUBTOTAL

MISCELLANEOUS PERMITS
Permit Center Processing/Filing Fee 1 Clerical Change - Renamed Fee
Standard Submittals each 124$ 124$ Increased by 2.5% Express Permit
Without Plan Check each 124$ 124$ Increased by 2.5% With Plan Check each 124$ 248$ 372$ Increased by 2.5% Building Plan Check Hourly Rates
Pre-Plan Check Meeting (each staff member) per hour 248$ 248$ Increased by 2.5% Standard Hourly Rate Plan Check per hour 248$ 248$ Increased by 2.5% Rechecks after 3 plan checks per hour 248$ 248$ Increased by 2.5% Building Deferred Submittal Plan Checks
Residential Trusses per hour
(2 hr min) 497$ 497$ Increased by 2.5% Non Residential Trusses per hour
(3 hr min) 745$ 745$ Increased by 2.5% Non Residential Pre-manufactures Stair Cases per flight 745$ 745$ Increased by 2.5% Fire Plan Check Hourly Rates
Fire Plan Checks per approved fire fee schedule
Fire Plan Checks Hourly per approved fire fee schedule
Hourly Rate Inspections
Standard Hourly Rate Inspection per hour 248$ 248$ Increased by 2.5% Overtime Hourly Rate Inspection per hour 281$ 281$ Increased by 2.5% Reinspection Fees per hour 248$ 248$ Increased by 2.5% 6 Refunds - 80% of inspection/Plan check fees if no
inspections/plan check was performed
Certificate of Occupancy and Business License Inspections New Construction Certificate of Occupancy each 248$ 248$ Increased by 2.5% Duplication/Issuance after special Occupancy Inspection (no occupancy change) each 745$ 745$ Increased by 2.5% Occupancy Inspection for business license each 248$ 248$ Increased by 2.5% Permit and Plan Check Extensions
Renewal within 6 months after permit expiration each 248$ 248$ Increased by 2.5% Renewal after 6 months - staff time plus outstanding
inspections/plan check actual cost
Address Assignment
Existing each 497$ 497$ Increased by 2.5% New each 497$ 497$ Increased by 2.5% Other Process
Research Fee per hour 248$ 248$ Increased by 2.5% Duplication of job cards/documents each 124$ 124$ Increased by 2.5% Housing and Building Code Appeals Board - Appeal Fee each 1,986$ 1,986$ Renaming Fee Housing and Building Code Appeals Board - Appeal Fee each 2,207$ 2,207$ Increasing to $2,207 Boarded/Vacant Building Fee
Monitoring Fee each 2,979$ 2,979$ Increased by 2.5% Cell Site/Commercial Antenna
New each 1,490$ 993$ 2,483$ Increased by 2.5% Modification to existing site each 497$ 993$ 1,490$ Increased by 2.5% Additional up to 10 items modified such as antennas,
cabinets, etc. each 248$ 248$ 497$ Increased by 2.5% 13 Awning/Canopy each 248$ 248$ 497$ Increased by 2.5% Balcony Repairs
Like for Like per unit 993$ -$ 993$ Increased by 2.5% With plan check per unit 993$ 497$ 1,490$ Increased by 2.5% 15 Construction Trailer each 248$ 248$ 497$ Increased by 2.5% Deck for single family dwellings
Ground Floor (repair like for like) each 372$ 497$ 869$ Increased by 2.5% 5 80%
7 8
Actual Cost
1 2
3 4 per approved fire fee
per approved fire fee
9 10
11 12
14 City of Alameda
Master Fee Schedule 21 Building - Permit Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check SUBTOTAL

MISCELLANEOUS PERMITS
Second Story and above (repair like for like) each 497$ 497$ 993$ Increased by 2.5% Ground Floor (replacement) each 745$ 745$ 1,490$ Increased by 2.5% Second Story and above each 745$ 745$ 1,490$ Increased by 2.5% Decks/Walkways Repairs (Multifamily)
Walkway including decking, guard rails. Like for like (first deck/walkway up to 300 s.f.) each 993$ 993$ Increased by 2.5% Like for like repairs (each additional 300 s.f.) each 497$ 497$ Increased by 2.5% Walkway including decking, guard rails. With plan check (first walkway up to 300 s.f.) each 993$ 745$ 1,738$ Increased by 2.5% With plan check (each additional deck) each 497$ 248$ 745$ Increased by 2.5% Demolition
Residential each 807$ 124$ 931$ Increased by 2.5% Commercial each 1,241$ 497$ 1,738$ Increased by 2.5% Accessory Structures or interior finishes each 497$ 248$ 745$ Increased by 2.5% Dryrot/Termite Repair
Value of <$10,000 like-for-like per report each 993$ 993$ Increased by 2.5% Value of >$10,000 with plan check each 993$ 497$ 1,490$ Increased by 2.5% Fence or Free Standing Wall
Fence or Freestanding Wall (light frame)
> six feet in height up to 100 l.f. 372$ 372$ Increased by 2.5% Each additional 100 linear feet ( l.f.) each 100 l.f. 62$ 62$ Increased by 2.5% Fence or Freestanding Wall (masonry or concrete)
> four feet in height up to 100 l.f. 372$ 248$ 621$ Increased by 2.5% Each additional 100 linear feet ( l.f.) each 100 l.f. 124$ 62$ 186$ Increased by 2.5% Retaining Walls
Retaining Wall-Special Design-≤6 ft high-First 100 linear feet ( l.f.) up to 100 l.f. 621$ 497$ 1,117$ Increased by 2.5% each additional 100 linear feet (l.f.) each 100 l.f. 186$ 124$ 310$ Increased by 2.5% Fire Damage to Single Family Dwelling
Up to 30% Fire Damage Miscellaneous - includes 4 plan
check/inspections only (MEP is extra) each 993$ 993$ 1,986$ Increased by 2.5% 30%-70% Fire Damage (MEP is extra) each 1,986$ 1,241$ 3,227$ Increased by 2.5% 70%-100% Fire Damage (fee for new single family dwelling) (MEP is extra) each
Fireplace
Masonry each 993$ 497$ 1,490$ Increased by 2.5% Pre-fabricated/Metal each 1,055$ 248$ 1,303$ Increased by 2.5% 24 Flag Pole each 372$ 248$ 621$ Increased by 2.5% Residential Patio Cover
Open, all types each 993$ 497$ 1,490$ Increased by 2.5% Enclosed, all types each 1,490$ 993$ 2,483$ Increased by 2.5% Piles or Pier/Pile Foundations
Cast in place Concrete (1st 10 piers) up to 10 745$ 497$ 1,241$ Increased by 2.5% Additional Piers (each 10) up to 10 248$ 248$ 497$ Increased by 2.5% Driven (steel, pre-stressed concrete, helical) up to 10 497$ 497$ 993$ Increased by 2.5% Additional Piles (each 10) up to 11 124$ 124$ 248$ Increased by 2.5% Residential Re-Reroofing (up to 3,000 s.f.)
Re-Roof over existing one layer roofing flat 248$ 248$ Increased by 2.5% Re-Roof with sheathing flat 372$ 372$ Increased by 2.5% Commercial Re-Roofing
Re-Roof over existing one layer roofing (up to 20,000
square feet) flat 745$ 745$ Increased by 2.5% each additional 20,000 square feet flat 248$ 248$ Increased by 2.5% Re-Roof with sheathing or insulation (up to 20,000 square feet) flat 1,490$ 497$ 1,986$ Increased by 2.5% each additional 20,000 square feet flat 497$ 62$ 559$ Increased by 2.5% Site Accessibility Improvements
Per ramp flat 372$ 497$ 869$ Increased by 2.5% 16 17
18 19
20 26
27 28
21 22
See Plan Check &
Inspection Fee Schedule
23 25
City of Alameda
Master Fee Schedule 22 Building - Permit Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check SUBTOTAL

MISCELLANEOUS PERMITS
Per stairway flat 745$ 497$ 1,241$ Increased by 2.5% Per accessible parking flat 497$ 497$ 993$ Increased by 2.5% Per elevator/lift flat 1,490$ 993$ 2,483$ Increased by 2.5% Parking lot restripe for up to 100 parking spaces flat 248$ 248$ 497$ Increased by 2.5% Skylight
Less than 10 s.f. each 248$ 248$ Increased by 2.5% Greater than 10 s.f. or structural each 248$ 248$ 497$ Increased by 2.5% Stairs
Stairs and hand/guard rails. Repairs includes plan check. first flight 372$ 497$ 869$ Increased by 2.5% Each Additional Flight per flight 248$ 124$ 372$ Increased by 2.5% Stairs and hand/guard rails. Replacement includes plan check. first flight 621$ 497$ 1,117$ Increased by 2.5% Each Additional Flight per flight 372$ 124$ 497$ Increased by 2.5% Storage Racks
First 500 linear feet ( l.f.) first 500 l.f. 745$ 745$ 1,490$ Increased by 2.5% Each Additional 100 linear feet ( l.f.) each 100 l.f. 124$ 62$ 186$ Increased by 2.5% Window or Doors for Single Family Dwelling, Duplex or
Multifamily up to 10 units. (for multifamily over 10 units, additional trips will be added as determined by the Building Official based on complexity)
Replacement type know as retrofits Up to 10 372$ 372$ Increased by 2.5% Additional Replacement / Retrofit each 10 186$ 186$ Increased by 2.5% New Construction Window (requires exterior changes
without framing) Up to 5 621$ 621$ Increased by 2.5% Additional new window each 5 248$ 248$ Increased by 2.5% New Construction Window with framing work Up to 5 869$ 248$ 1,117$ Increased by 2.5% Additional new window each 5 248$ 124$ 372$ Increased by 2.5% Window Non-Residential-new/changeout (Each
storefront) each 497$ 497$ 993$ Increased by 2.5% Fixed Permit Fees for Residential Projects
Bathroom Remodel like for like - Less than 300 sq ft (no structural or exterior changes)
flat 1,490$ 1,490$ Increased by 2.5%
35 Kitchen Remodel like for like - Less than 300 sq ft (no structural or exterior changes) flat 1,303$ 1,303$ Increased by 2.5% Siding/Stucco
Repair up to 500 square feet flat 745$ 745$ Increased by 2.5% Repair/replacement up to 2,000 square feet flat 993$ 993$ Increased by 2.5% Replacements up to 3,000 square feet flat 1,117$ 1,117$ Increased by 2.5% Gas Shut off Valve each 124$ 124$ Increased by 2.5% Gas Shut off Valve permit reissuance to new owner or
contractor
each 62$ 62$ Increased by 2.5% 38 Marsh Crust, (per Muni Code 13-56) each 745$ 745$ Increased by 2.5% 39 Swimming Pools
Private, residential, in-ground swimming pools - includes a complete system of necessary branch circuit wiring,
bonding, grounding, underwater lighting, water pumping
and other similar electrical equipment directly related to the operation of a swimming pool
each 1,738$ 745$ 2,483$
Increased by 2.5%
Public non-residential, in-ground swimming pools -
includes a complete system of necessary branch circuit
wiring, bonding, grounding, underwater lighting, water
pumping and other similar electrical equipment directly related to the operation of a swimming pool
each 1,738$ 993$ 2,731$
Increased by 2.5%
All other types of swimming pools, therapeutic whirlpools, spas, and alterations to existing swimming pools each 372$ 124$ 497$ Increased by 2.5%
40 Seismic Retrofit/Strengthening (Residential) up to 100 l.f. 497$ 248$ 745$ Increased by 2.5% Each additional 100 linear feet ( l.f.) each 100 l.f. 248$ 124$ 372$ Increased by 2.5% 29 30
37 31
32 33
34 36
City of Alameda
Master Fee Schedule 23 Building - Permit Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check SUBTOTAL

MISCELLANEOUS PERMITS
41 Seismic Retrofit/Strengthening per ABAG Plan or 2006 IEBC each 372$ 124$ 497$ Increased by 2.5%

AMP FEES
Alameda Municipal Power Service Connect/Disconnect Fee
(Overhead or Underground) [4]
During work hours flat Increased by 2.5%
After work hours actual cost

OTHER APPLICABLE FEES
43 Technology Fee [2] percent of permit
44 Community Planning Fee [3] percent of valuation
45 Improvement Tax (applies only on permits with valuation over $5,000. Except that ADU's, and Alameda Housing Authority Development Projects are Exempt)
Each
NON-CITY FEES (Required by State Law)
DEVELOPMENT IMPACT FEES - as applicable
See DIF section
See Affordable Housing Fees section
INCLUSIONARY HOUSING FEES - as applicable
See Affordable Housing Fees section
50 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
hourly $248 Increased by 2.5%
[Notes]
[1] Processing Fee is applicable to all permits.
[2] Clerical Change
[3]
[4] Fee set by Alameda Municipal Power.
[5]
42 502$
Actual Costs
6% of Applicable Activity
Fees
Community Planning Fee: 0.5% of construction job valuation, minimum $5, applies to all permits.

Fees do not include charges by the Fire Department, Alameda Municipal Power, Planning, and/or Public Works. 47 48 AFFORDABLE HOUSING FEES FOR NON-RESIDENTIAL DEVELOPMENT - as applicable 49 Technology Fee: 6% fee applies to all applicable filing, permit and inspection fees and any additonal activity fees. Does not apply to state fees, community planning fee, improvement tax, school fees, development impact fees. .5% of Job Valuation
1% of Permit Valuation
46 Strong Motion Instrumentation Program (SMIP) - Set by State Building Standards - Fee Set by State
School Fees (Alameda Unified School District) - Set by AUSD City of Alameda
Master Fee Schedule 24 Building - Permit Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check Subtotal

MECHANICAL, PLUMBING & ELECTRICAL PERMITS

ELECTRICAL
1 Stand Alone Plan Check per hour -$ 248$ 248$ Increased by 2.5% 2 Electrical upgrades or repairs each 248$ -$ 248$ Increased by 2.5% Residential
3 New Service-Single Family Dwelling 200 amp or less service (includes Circuits, Outlets, Switches, and one sub-panel) each 745$ -$ 745$ Increased by 2.5%
4 Sub-Panels-Single family Single phase 200 amps or less each 248$ -$ 248$ Increased by 2.5% 5 New Service-Single Family Single phase Services 400 amps or less each 497$ 497$ 993$ Increased by 2.5% 6 Service Change-Out -Single Family Single phase each 372$ -$ 372$ Increased by 2.5% 7 Single Family Dwelling Residential Rewire
Without panel change out minimum fee from 500 to 3,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub-panels included)
each 621$ -$ 621$
Increased by 2.5%
With panel change out minimum fee from 500 to 3,000 square feet (includes Circuits, Outlets, Switches, etc and (1) sub-panels included)
each 745$ -$ 745$
Increased by 2.5%
Without panel change out minimum fee from 3,001 to 5,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub- panels included)
each 869$ -$ 869$
Increased by 2.5%
With panel change out minimum fee from 3,001 to 5,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub-panels included)
each 993$ -$ 993$
Increased by 2.5%
8 Multifamily Residential Rewire
Multifamily Residential rewire without panel change out minimum fee from 500 to 3,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub-panels included)
per unit 621$ -$ 621$ Increased by 2.5%
9 400 Amps each 497$ 497$ 993$ Increased by 2.5% 10 600 Amps each 497$ 621$ 1,117$ Increased by 2.5% 11 Commercial/Industrial and all three phase - "New service only" or change out
Meter Pedestal 200 Amps or less each 497$ -$ 497$ Increased by 2.5% 200 Amps or less each 497$ -$ 497$ Increased by 2.5% 400 Amps each 497$ 497$ 993$ Increased by 2.5% 600 Amps each 497$ 497$ 993$ Increased by 2.5% 800 Amps each 621$ 621$ 1,241$ Increased by 2.5% 1000 Amps each 621$ 621$ 1,241$ Increased by 2.5% 1200 Amps each 621$ 621$ 1,241$ Increased by 2.5% 1600 Amps each 993$ 745$ 1,738$ Increased by 2.5% each 1000 Amps over 1600 each 248$ 124$ 372$ Increased by 2.5% 12 Sub-Panels, motor control panels etc. Commercial/Industrial all three phase, includes all circuits
200 Amps or less each 248$ 248$ 497$ Increased by 2.5% 400 Amps each 497$ 497$ 993$ Increased by 2.5% 600 Amps each 497$ 497$ 993$ Increased by 2.5% 800 Amps each 621$ 621$ 1,241$ Increased by 2.5% 1000 Amps each 621$ 621$ 1,241$ Increased by 2.5% 1200 Amps each 621$ 621$ 1,241$ Increased by 2.5% 1600 Amps each 993$ 745$ 1,738$ Increased by 2.5% each 1000 Amps over 1600 each 248$ 124$ 372$ Increased by 2.5% Other Misc Electrical Items
13 Transformer - each each 248$ 248$ 497$ Increased by 2.5% 14 Generator
Permanent - Each under 400 lbs each 372$ 497$ 869$ Increased by 2.5% Permanent - Each over 400 lbs each 497$ 745$ 1,241$ Increased by 2.5% Permanent - Large Commercial Standby each 745$ 993$ 1,738$ Increased by 2.5% Temp - more than 8 kW each 248$ -$ 248$ Increased by 2.5% 15 Solar - Photovoltaic System [8]
Residential (Up to 15 kW) flat 461$ -$ 461$ Increased by 2.5% Per kW above 15kW per kW 15$ -$ 15$ Increased by 2.5% City of Alameda
Master Fee Schedule 25 Building - M, E & P Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check Subtotal

MECHANICAL, PLUMBING & ELECTRICAL PERMITS
Commercial (Up to 50 kW) flat 1,025$ -$ 1,025$ Increased by 2.5% Per kW between 51kW - 250kW per kW 7$ -$ 7$ Increased by 2.5% Per kW above 250kW per kW 5$ -$ 5$ Increased by 2.5% Solar - Battery Storage System ESS
Solar - Photovoltaic - Residential Load Center Subpanel - 200 amps or less each 248$ -$ 248$ Increased by 2.5% Solar - Photovoltaic - Residential Storage Batteries systems - 200 amps or less (part of a solar system submittal)
each system
up to 3
batteries
124$ 124$ 248$
Increased by 2.5%
Solar - Photovoltaic - Residential Storage Batteries systems - 200 amps or less (NOT part of a solar system submittal/stand-alone) each system
up to 3
batteries
248$ 248$ 497$
Increased by 2.5%
16 Temporary Power Pole
Temporary Power Pole each 248$ -$ 248$ Increased by 2.5% Temporary Power Pole - Addtl receptable pole each 62$ -$ 62$ Increased by 2.5% 17 Light Stand
Light Stand - First 5 poles each 248$ 372$ 621$ Increased by 2.5% Each Addtl 5 Poles each 62$ 62$ 124$ Increased by 2.5% Electrical Sign-Per Sign 200 sq ft or less/ includes 2 sign transformers 18 Wall mounted 200 sq ft or less each 248$ 124$ 372$ Increased by 2.5% 19 Monument 6 ft high or less and 200 sq ft or less each 372$ 497$ 869$ Increased by 2.5% 20 Pole/Monument Sign
200 sq ft or less and 20 ft high or less each 372$ 745$ 1,117$ Increased by 2.5% Each addtl 200 sq ft and/or 20 ft each 186$ 62$ 248$ Increased by 2.5% 21 Hazardous Locations Misc Electrical each 497$ 497$ 993$ Increased by 2.5% 22 Fuel Cell - Power Generating System, each 200 amp ac each 497$ 497$ 993$ Increased by 2.5% 23 Electrical Vehicle Charging Station
Commercial each 497$ 497$ 993$ Increased by 2.5% Residential each 248$ 248$ 497$ Increased by 2.5% EV - only main service panel each 124$ 62$ 186$ Increased by 2.5% 24 Miscellaneous Electrical Circuits
Residential up to 10
circuits 372$ -$ 372$ Increased by 2.5% Non Residential up to 10
circuits 372$ 497$ 869$ Increased by 2.5%

PLUMBING
1 Stand Alone Plan Check per hour -$ 248$ 248$ Increased by 2.5% 2 Plumbing upgrades or repairs each 248$ -$ 248$ Increased by 2.5% 3 Plumbing fixtures (each)water closet, lavatories, tubs, dishwasher, urinals, showers, floor drains, etc.
each 248$ -$ 248$ Increased by 2.5% 4 Water Heater
Storage tank 100 Gal or less each 248$ -$ 248$ Increased by 2.5% Storage tank over 100 Gal each 248$ 248$ 497$ Increased by 2.5% Gas-instantaneous 199,000 btu or less each 372$ 248$ 621$ Increased by 2.5% Electrical instantaneous (intsa hot) each 372$ 124$ 497$ Increased by 2.5% 5 Interceptor
Grease, oil, sand etc (Small) each 248$ 248$ 497$ Increased by 2.5% Grease, oil, sand etc (Large) each 248$ 497$ 745$ Increased by 2.5% 6 Water Softener each 248$ -$ 248$ Increased by 2.5% 7 Water Repipe-Single Family Dwelling each 372$ -$ 372$ Increased by 2.5% 8 Medical Gas/Air outlets up to 5
outlets 497$ 497$ 993$ Increased by 2.5% 9 Gray Water System each 372$ 248$ 621$ Increased by 2.5% 10 Roof Drains per building 372$ 248$ 621$ Increased by 2.5% 11 Commercial Reclaimed water system each 372$ 248$ 621$ Increased by 2.5% 12 Water Service each 248$ -$ 248$ Increased by 2.5% 13 Hot Water Recirculation System each 248$ 248$ 497$ Increased by 2.5% 14 Backflow valves each 248$ 248$ 497$ Increased by 2.5% 15 Sump Pump per building 248$ 248$ 497$ Increased by 2.5% City of Alameda
Master Fee Schedule 26 Building - M, E & P Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check Subtotal

MECHANICAL, PLUMBING & ELECTRICAL PERMITS

MECHANICAL
1 Stand Alone Plan Check per hour -$ 248$ 248$ Increased by 2.5% 2 Mechanical upgrades or repairs each 248$ -$ 248$ Increased by 2.5% 3 A/C Unit
≤ 100,000 BTU each 248$ 248$ 497$ Increased by 2.5% >100,000 BTU each 248$ 248$ 497$ Increased by 2.5% >100,000 BTU Roof Top Unit over 400 lbs (each) each 372$ 372$ 745$ Increased by 2.5% 4 FAU Furnace or Heat Pump
<100,000 BTU each 248$ 248$ 497$ Increased by 2.5% >100,000 BTU each 248$ 248$ 497$ Increased by 2.5% 5 Refrigeration Unit each 248$ 248$ 497$ Increased by 2.5% 6 Condensers each 248$ 248$ 497$ Increased by 2.5% 7 Boilers
100,000 BTU or less each 497$ 497$ 993$ Increased by 2.5% 500,000 BTU or less each 497$ 497$ 993$ Increased by 2.5% 1,000,000 BTU or less each 497$ 745$ 1,241$ Increased by 2.5% 1,750,000 BTU or less each 745$ 745$ 1,490$ Increased by 2.5% Over 1,750,000 BTU each 993$ 745$ 1,738$ Increased by 2.5% 8 Compressors each 248$ 248$ 497$ Increased by 2.5% 9 Evaporative Coolers-Commercial/Industrial each 248$ 248$ 497$ Increased by 2.5% 10 Air Handling Unit each 248$ 372$ 621$ Increased by 2.5% 11 Environmental Air Duct/Vent Fan single duct/Res range exhaust each 248$ 248$ 497$ Increased by 2.5% 12 Type 1 or 2 Hood/Duct system each 497$ 497$ 993$ Increased by 2.5% 13 Special Equipment
Spray Booth (Exterior of Bldg) each 372$ 497$ 869$ Increased by 2.5% Spray Booth (Interior of Bldg) each 372$ 497$ 869$ Increased by 2.5% 14 Wall Heater each 248$ 248$ 497$ Increased by 2.5% 15 Commercial Unit Heater each 372$ 248$ 621$ Increased by 2.5% 16 Cooling Tower/Chiller each 745$ 745$ 1,490$ Increased by 2.5% 17 Fueling Station Dispenser/Equipment each 372$ 497$ 869$ Increased by 2.5% 18 Underground Storage Tank
1 tank each 372$ 497$ 869$ Increased by 2.5% 2 tanks each 497$ 497$ 993$ Increased by 2.5% 3 tanks each 497$ 745$ 1,241$ Increased by 2.5% Add'l tank over 3 each 62$ 62$ 124$ Increased by 2.5% 19 Above Ground Storage Tank
Install (0-660 gallons) each 248$ 497$ 745$ Increased by 2.5% Install (661+ gallons) each 372$ 621$ 993$ Increased by 2.5% 20 Package wall unit heat /cooling ≤ 100,000 BTU each 248$ 248$ 497$ Increased by 2.5% 21 Fireplace-Listed Mechanical per unit each 248$ 248$ 497$ Increased by 2.5% 22 Product -Conveying Duct System-Dust, Vapor, Central Vacuum system (PC based on dust collection) each 372$ 745$ 1,117$ Increased by 2.5% 23 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application. hourly 248$ -$ 248$
Increased by 2.5%

CONSOLIDATED MEP FEES FOR PROJECTS
(These fees are in addition to the Building Fees)
1 Multifamily and Hotels/Motels (New or Remodel)
Multifamily MEP Fee Projects (with up to 10 units) per unit 1,490$ -$ 1,490$ Increased by 2.5% Multifamily MEP Fee Projects (with over 10 units) per unit 745$ -$ 745$ Increased by 2.5% 2 Single family dwelling or duplex per unit
MEP for single familiy dwelling (For up to 3 bathrooms) each 745$ -$ 745$ Increased by 2.5% Each bathroom after 3 each 124$ -$ 124$ Increased by 2.5% 3 Commercial Projects for Business (B) and Mercantile (M) occupancies (New or Remodel)
City of Alameda
Master Fee Schedule 27 Building - M, E & P Fees

BUILDING
Fee No. Fee Name
Notes
Fee Unit Proc/Insp Plan Check Subtotal

MECHANICAL, PLUMBING & ELECTRICAL PERMITS
Small Commercial projects per tenant space up to 1,500 square feet each 993$ -$ 993$ Increased by 2.5% Commercial projects per tenant space over 1,500 square feet (Per MEP Items) each item 497$ -$ 497$ Increased by 2.5% 4 Commercial Projects for Assembly (A) Educational (E) and Institutional (I) occupancies (New or Remodel)
Small Commercial projects per tenant space up to 1,500 square feet each 1,241$ -$ 1,241$ Increased by 2.5%
Commercial projects per tenant space over 1,500 square feet (Per MEP Items)
each item 621$ -$ 621$ Increased by 2.5% 5 Factory and Industrial (F) High Hazard (H) Storage (S) and Utility (U) (New or Remodel)
Small Commercial projects per tenant space up to 1,500 square feet each 1,241$ -$ 1,241$ Increased by 2.5% Commercial projects per tenant space over 1,500 square feet (Per MEP Items) each item 497$ -$ 497$ Increased by 2.5% 6 MEP for Shells all occupacies
Small Commercial projects per tenant space up to 1,500 square feet each 993$ -$ 993$ Increased by 2.5% Commercial projects per tenant space over 1,500 square feet (Per MEP Items) each item 497$ -$ 497$ Increased by 2.5%
[Notes]
[1] Processing Fee is applicable to all permits.
[2]
Clerical Change
[3]
[4] Fee set by Alameda Municipal Power.
[5]
[6]
[7]
[8] Fees for solar systems will be charged in accordance with State Law.

Technology Fee: 6% fee applies to all applicable filing, permit and inspection fees and any additional activity fees. Does not apply to state fees, community planning fee, improvement tax, school fees, development impact fees.

Community Planning Fee: 0.5% of construction job valuation, minimum $5, applies to all permits.

Fees do not include charges by the Fire Department, Alameda Municipal Power, Planning, and/or Public Works.

MEP (Mechanical, Electrical and Plumbing) items will be assessed based on the time needed to complete the inspection process.

Plan check fees will only be assessed as needed to provide the service.

City of Alameda
Master Fee Schedule 28 Building - M, E & P Fees

CODE ENFORCEMENT

CODE ENFORCEMENT
1 Code Enforcement Process
Property related inspections required to verify code
compliance
Initial Complaint flat -$
Preliminary Investigation flat -$
Initial Inspection - Visible from street
Violation found flat 502$ Increased by 2.5% No violation found flat -$
Initial inspection - Not visible from street
Violation found flat 2,094$ Increased by 2.5% No violation found flat -$
Code enforcement costs incurred by the City after initial investigation and after violation notice
Follow up inspection after initial inspection and notice issued - Visible from street flat 335$ Increased by 2.5% Follow up inspection after initial inspection and notice issued - Not visible from street flat 670$ Increased by 2.5% If case has not been abated after initial/follow-up
inspection
Visible from street flat 335$ Increased by 2.5% Not visible from street flat 1,842$ Increased by 2.5% 2 Tobacco Retailer's License Fee (AMC Section 6-60)
Tobacco Retailer's License Fee flat 1,006$ Increased by 2.5% Finance Department Processing Fee 67$ Increased by 2.5% City Staff - Finance Department flat 30$ Increased by 2.5% HDL Prime Software flat 37$ Increased by 2.5% Total 1,072$
3 Code Enforcement Inspection Fees for Tobacco Retailers Violation found (6.25 hrs @ $335.20/hour) flat 2,095$ Increased by 2.5% No violation found (3.0 hrs @ $335.20/hour) flat 1,006$ Increased by 2.5% Each additional hour of investigation or enforcement
action flat 335$ Increased by 2.5%
4 Housing and Building Code Appeals Board
Appeal filing flat 2,207$
5 Unpermitted Work/Zoning Ordinance/Public Works Violations Violations requiring Building Plan Check and Inspections Base fees + hourly rate [1] Base fees +
hourly rate New - Adding Fee
Violations requiring Planning/Zoning entitlements and/or Public Works permits
Base fees +
equivalent
deposit
Base fees +
equivalent
deposit
New - Adding Fee
6 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
hourly 335$ Increased by 2.5%
Notes:
[1] Clerical Change -
Adding Note #1
Fee No.

New - Adding Fee
Per California Building Code (CBC), Title 24, Part 2, Section 109, "any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to a fee established by the building official that shall be in addition to the required permit fees." The fee shall consist of the base plan check and inspection fees, along with any additional costs to the City based on the staff hourly rate required to perform the necessary plan review and inspections.

Fee Name Fee Unit / Type
NotesFees / Deposit
City of Alameda
Master Fee Schedule 29 Code Enforcement

FIRE DEPARTMENT

I FIRE CODE INITIAL PERMITS
1 Permit Issuance each [5] 106$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 2 Fire Plan Review hourly - 1 hour
minimum
415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) each additional hour each add'l hr., or
fraction thereof
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)

II STATE MANDATED & FIRE DEPARTMENT ANNUAL OCCUPANCY INSPECTIONS 3 A Occupancies (i.e. assembly places)
initial
(2.5 hour
minimum)
606$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
4 B Occupancies - (i.e. bank, professional office)
initial
(2 hour
minimum)
256$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
5 E Occupancies - (i.e. educational)
initial
(2.75 hour
minimum)
665$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
6 F Occupancies - (i.e. Factory)
initial
(2.5 hour
minimum)
607$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
7 H Occupancies - (i.e. High Hazard)
initial
(2.75 hour
minimum)
666$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
8 I Occupancies - (i.e. Institutional)
initial
(2.75 hour
minimum)
665$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
9 L Occupancies
initial
(2.75 hour
minimum)
665$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
10 M Occupancies - (i.e. market, department or drug store) initial
(2.5 hour
minimum)
607$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
11 R Occupancies - (i.e. Residential with 3+ units)
3-10 units
initial
(2.5 hour
minimum)
330$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
11-20 units
initial
(2.5 hour
minimum)
441$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 10 units (i.e. 21-30, 31-40, 41-50, etc.) initial
(1 hour
minimum)
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
City of Alameda
Master Fee Schedule 30 Fire

FIRE DEPARTMENT
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
12 S Occupancies - (i.e. Storage)
initial
(2.5 hour
minimum)
607$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
13 U Occupancies - (i.e. Accessory; Private Garage, Agriculture building, etc.) initial
(2.5 hour
minimum)
607$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional 1/2 hour
each add'l 1/2
hr., or fraction
thereof
121$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
14 Marinas
Up to 700 slips per permit 1,115$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 701+ slips per permit 1,332$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 15 Licensed Care Facilities (State and County License Mandated) Fire Pre-Inspection/Consultation each 485$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Licensed Care Facility (7–49) each 485$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Licensed Care Facility (50+) each 607$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 16 Re-Inspections (3rd and subsequent) per inspection 485$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)

III FIRE LIFE SAFETY REVIEW OF CONSTRUCTION PERMITS
17 Building Construction Plan Review hourly -
minimum 2 hour
830$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional hour each add'l hr., or
fraction thereof
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
18 Building Final Inspection / Certificate of Occupancy Inspection/Temporary Certificate of Occupancy (TCO) Inspection performed by Fire hourly -
minimum 2 hour
830$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
each additional hour each add'l hr., or
fraction thereof
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
19 Construction Fire plan review fee if more than one review is needed hourly 830$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 20 Pre-submittal conference Fire Prevention Consultation hourly 415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)

IV FIRE SPRINKLER SYSTEMS
21 New Construction -Permit includes four (4) inspections: First on-site (rough), weld, hydrostatic test, flush and final
Inspections/New Systems
0-5,000 s.f. per project 1,245$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 5,001-15,000 s.f. per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 15,001-30,000 s.f. per project 2,074$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) >30,001 s.f. (each additional 10k s.f.) per project 415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 22 Tenant Improvement -Permit includes four (4) inspections: First on-site (rough), weld, hydrostatic test, flush and final
Repairs / Alterations to existing system
0-5,000 s.f. per project 1,245$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 5,001-15,000 s.f. per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 15,001-30,000 s.f. per project 2,074$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) >30,001 s.f. (each additional 10k s.f.) per project 415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 23 Fire Underground - Plan Check hourly -
minimum 1 hour
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
Each Additional Half Hour each add'l hr., or
fraction thereof
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
24 Fire Underground Permit - includes one (1) inspection (hydro/flush) per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Each Additional Hydrant / Connection per project 415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Each Additional Inspection hourly -
minimum 1 hour
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
City of Alameda
Master Fee Schedule 31 Fire

FIRE DEPARTMENT
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
25 Fire Hydrant (private - includes one (1) hydrant) per project 830$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Each Additional Hydrant per project 415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 26 Standpipes per project 1,245$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Standpipes - Each additional riser per project 830$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 27 Suppression System
Hood per project 1,245$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Agents per project 2,074$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 28 Emergency Responder Radio Coverage (ERRC) per project Buildings up to and including 4 stories (including and below grade levels) per project 1,245$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Buildings containing 5-7 stories per project 1,452$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) High-rise buildings (>7 stories) per project 2,074$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 29 Fire Pumps per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Each Additional Pump per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 30 Fire Sprinkler System Inspection - if additional inspections are required as a result of an above permit
Hourly - 1 hour
minimum
415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)

V FIRE ALARM SYSTEMS
31 New Construction -Permit includes two (2) inspections: First on-site (rough) and final
Inspections/New Systems
0-5,000 s.f. per project 1,245$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 5,001-15,000 s.f. per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 15,001-30,000 s.f. per project 2,074$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) >30,001 s.f. (each additional 10k s.f.) per project 415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 32 Tenant Improvement -Permit includes two (2) inspections: First on-site (rough) and final
Repairs / Alterations to existing system
0-5,000 s.f. per project 1,245$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 5,001-15,000 s.f. per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 15,001-30,000 s.f. per project 2,074$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) >30,001 s.f. (each additional 10k s.f.) per project 415$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 33 Fire Alarm System Inspection - if additional inspections are required as a result of any above permit
Hourly - 1 hour
minimum
415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)

VI FIRE FALSE ALARMS
34 Excessive or malicious residential false alarms causing response of fire apparatus (annual)
First Alarm each No Charge No CPI
2nd alarm each 274$ Increased by 2.5% CPI 3rd alarm each 344$ Increased by 2.5% CPI 4th alarm each 344$ Increased by 2.5% CPI Each additional each 703$ Increased by 2.5% CPI 35 Excessive or malicious commercial false alarms causing response of fire apparatus (annual)
First Alarm each No Charge No CPI
2nd alarm each 344$ Increased by 2.5% CPI 3rd alarm each [1] 703$ Increased by 2.5% CPI Each additional each 703$ Increased by 2.5% CPI

VII OTHER FEES AND CHARGES
36 Hazardous Materials Inspection(Category 1 and 2 New or Annual Permit) Aerosol Products per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Flammable gasses, 200 cubic feet or more per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Highly Toxic material per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Radioactive material per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Corrosive - Inside, over 55 gallons per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Corrosive, Outside, over 1 gallon (combine) per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Flammable - Inside, over 1 gallon per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Flammable, Outside, 60 gallons or more (combine) per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Oxidizer - 50 gallons or more (combine) per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Class I Liquids - Inside, more than 5 gallons per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Class I Liquids - Outside, more than 10 gallons per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) City of Alameda
Master Fee Schedule 32 Fire

FIRE DEPARTMENT
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
Storage or use of paints, oils, varnishes, or similar mixtures for maintenance, painting or similar purposes for less than 30 days per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Class II or II-A Liquids - Inside, more than 25 gallons per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Class II or III-A Liquids - Outside, more than 60 gallons per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 37 Installation, Construction, Alteration or Operation where flammable or combustible liquids are produced, processed, transported, stored, dispensed or used in any of the following:

Distilleries per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Motor Vehicle Fuel-Dispensing Stations per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Repair Garages per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Spraying or Dipping per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 38 High Piled Combustible Storage
Initial Inspection per permit 1,452$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Annual Permit & inspection per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 39 CO2 Systems / Cylinders (new system or storage) per permit 1,452$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 40 Tank Install/Removal
Tank Install per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Tank Install - Piping only per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Tank Removal per project 1,659$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 41 Special Permits
Burn and Weld (routine welding operation) per permit 969$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Fireworks / Pyrotechnic Displays per permit [4] 2,182$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Fumigation and Storage per permit 1,212$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) Other CA Fire Code Permits not Listed per permit 969$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 42 Tent Permits - includes plan review and first inspection 201 to 400 square feet per permit 485$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 401 to 1500 square feet per permit 485$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 1501 - 4,500 square feet per permit 607$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 4501 - 15,000 square feet per permit 728$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 15,001 - 30,000 square feet per permit 848$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) > 30,000 square feet per permit 1,090$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 43 Re-Inspection (after initial and first reinspection) per inspection 364$ Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%) 44 After hours inspection - personnel current salary and benefits actual overtime costs
Actual Overtime
Costs
45 Board-up/post-incident mitigation/Electrical Vehicle Fire Blanket per incident Actual Costs Clerical - Renaming Fee 46 Copy Service - per page
Standard Sized Documents per page 0.10$ No CPI Oversized Documents per page 1$ No CPI 47 Ambulance Fees [2]
Base Rate - Ambulance Fee flat 5,001.45$
Mileage / Mile per mile 112.85$
Oxygen flat 373.65$
Treatment/Non-Transport flat 1,003.06$
Bundled Ambulance Transport Rate flat 5,436.05$ Base Rate + EMS First Responder Fee 48 First Responder Fee
EMS First Responder Fee per response [3] 434.60$ Increased by 2.5% CPI 49 Personnel and Equipment Hourly Rates: [2]
Equipment without staff hourly 126$ Increased by 2.5% CPI Standard Fire Engine without staff hourly 260$ Increased by 2.5% CPI Staff Vehicle without staff hourly 60$ Increased by 2.5% CPI Ladder Truck without staff hourly 260$ Increased by 2.5% CPI Technical rescue without staff hourly 347$ Increased by 2.5% CPI Fire Boat without staff hourly 164$ Increased by 2.5% CPI Ambulance without staff hourly 130$ Increased by 2.5% CPI Support Materials - based on item and actual cost hourly Actual Costs No CPI Personnel - current salary and benefits hourly
Salary & Benefits
No CPI
Updated by the County
City of Alameda
Master Fee Schedule 33 Fire

FIRE DEPARTMENT
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
50 Recordation and Technology Fee (permits and Inspections) per permit/ inspection
6% of permit or
inspection value
51 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application. hourly 415$
Increased by 8.92% (Feb26 CPI of 2.5% + Catchup 6.42%)
Notes
[1]
[2]
[3]
[4]
[5]
The EMS First responder fee
Fire Inspections required. After the 3rd commercial false alarm, and every other subsequent false alarm, there will be a mandatory fire inspection to determine potential causes of the false alarms. The fee associated with this inspection will be based upon occupancy, as identified under Fire Inspections. This inspection fee is separate of, and in addition to, the false alarm fee.

Additional hourly plan review, inspection, or costs of staffing/supporting special events may apply.

See Building Permit Center Processing Fee - Standard.

Ambulance rates are established by contract with Alameda County EMS. The City of Alameda follows the County's adopted fee schedule.

City of Alameda
Master Fee Schedule 34 Fire
East Bay Municipal Utiliy District (EBMUD) Monthly Service Fee Pass-Through East Bay Municipal Utiliy District (EBMUD) Monthly Service Fee Pass-Through The City will pass-through to tenants of City-owned property all monthly service charges incurred from the use of EBMUD service specific to the tenant's leased premises. The pass-through amount is EBMUD's current rate, as established by Schdule A - Rate Schedule for Fee Service, effective July 1, 2021, or the most current adopted EBMUD rate schedule.

City of Alameda
Master Fee Schedule 35 Base Reuse

PUBLIC WORKS

ENTITLEMENT REVIEW
1 Public Works Review of Planning Applications
Minor Project - Base Fee flat [8] 259$ Increased by 2.5% Major Project - Base Fee flat [8] 3,602$ Increased by 2.5% Additional Engineering Review hourly 259$ Increased by 2.5% Additional Clean Water Review hourly 223$ Increased by 2.5% Additional Zero Waste Review hourly 230$ Increased by 2.5% 2 Public Works Review of Building Permits
Minor Project - Base Fee flat [8] 259$ Increased by 2.5% Major Project - Base Fee flat [8] 2,647$ Increased by 2.5% Additional Engineering Review hourly 259$ Increased by 2.5% Additional Clean Water Review hourly 223$ Increased by 2.5% Additional Zero Waste Review hourly 230$ Increased by 2.5% 3 Lot Line Adjustments and Easements deposit 3,597$ Increased by 2.5% Consultant actual cost Actual Cost

4 Certificate of Compliance flat 1,294$ Increased by 2.5% Consultant actual cost Actual Cost

FINAL MAP REVIEW
5 Parcel Map/Waiver deposit 7,465$ Increased by 2.5% Consultant actual cost Actual Cost
6 Tract deposit 7,465$ Increased by 2.5% Consultant actual cost Actual Cost
7 IMPROVEMENT PLAN REVIEW (ONSITE/ OFFSITE/ GRADING/

DEMOLITION)
Up to $150,000 deposit 8,655$ Increased by 2.5% Up to $1,000,000 deposit 12,723$ Increased by 2.5% Up to $10,000,000 deposit 29,281$ Increased by 2.5% Over $10,000,000 deposit 35,349$ Increased by 2.5% 8 IMPROVEMENT INSPECTION (ONSITE/ OFFSITE/ GRADING/

DEMOLITION)
Up to $150,000 deposit 13,829$ Increased by 2.5% Up to $1,000,000 deposit 84,576$ Increased by 2.5% Up to $10,000,000 deposit 405,480$ Increased by 2.5% Over $10,000,000 deposit 683,834$ Increased by 2.5% 9 PARKING SIGNS
Sign Fee each [4] 2.50$ No CPI Meter Fee each/per day 14$ Increased by 2.5% No Parking Sign Processing Fee flat 23$ Increased by 2.5%

PERMIT PARKING PROGRAM
10 Evaluation of request to add or remove Preferential Parking Zones (requires a petition representing at least 40% of residents) deposit 6,466$ Increased by 2.5%
11 Evaluation of request to add or remove Preferential Parking Zones (requires a petition representing at least 55% of residents) actual cost No Deposit Required, Actual Cost 12 Design/Construction/Permitting/misc of Preferential Parking Zones actual cost Actual Cost Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
City of Alameda
Master Fee Schedule 36 Public Works

PUBLIC WORKS
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
RIGHT-OF-WAY PERMITS [2]
13 Encroachment - Residential flat [9] 258$ Increased by 2.5% 14 Encroachment - Multi-Family/ Commercial/ Industrial flat [9] 1,552$ Increased by 2.5% 15 Temporary - Other flat 1,552$ Increased by 2.5% 16 Encroachment - Multiple Locations / Other hourly 259$ Increased by 2.5% 17 Temporary - Utility Right of Way Inspection hourly [6] 259$ Increased by 2.5% 18 Security Deposit - Utility work by non-utilities refundable deposit 3,500$ No CPI 19 Small Cell deposit 1,552$ Increased by 2.5% 20 Encroachment Agreement flat 2,587$ Increased by 2.5% 21 Encroachment Agreement Annual Inspection flat 517$ Increased by 2.5% 22 Parklet Fee, Annual flat 2,400$ No CPI 23 Sidewalk Vendor Permit Fee each 50$ No CPI 24 Additional Inspection (per trip) hourly 259$ Increased by 2.5% 25 Additional Plan Review (per submittal) hourly 259$ Increased by 2.5% 26 Transportation Permit for Oversize/Overweight Vehicles and/or Loads
Per Trip flat [1] 16$ No CPI Annual flat [1] 90$ No CPI 27 City Attorney Filing Fee flat [5] 77$ No CPI

SOLID WASTE AND RECYCLING PERMITS - HAULING FEES AMC
CHAPTER 21 COMPLIANCE
28 Annual hauling permits
Basic Fee (Annual) - review of non-franchise hauler to operate flat 1,036$ Increased by 2.5% Reporting Fee (Annual after the first year)
Program Fee [5] $11.00 per ton hauled, paid bi-annually No CPI Impact Mitigation Fee [5] $3.44 per ton hauled, paid bi-annually No CPI City of Alameda
Master Fee Schedule 37 Public Works

PUBLIC WORKS
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
Performance Security Bond [5] $114 per estimated ton No CPI

SOLID WASTE AND RECYCLING PERMITS - HAULING FEES (C&D)
29 For permitted project debris reporting, per permit:

Waste Management Plan (WMP) and Report review (online) flat 576$ Increased by 2.5% Waste Management Plan (WMP) and Report review (paper) flat 1,381$ Increased by 2.5% Penalty for failure to meet CALGreen minimum Recycling Rate Penalty [5] $116 per ton No CPI

SEWER LATERAL WORK
30 Sewer Lateral Work Security Deposit refundable deposit 3,500$ No CPI 31 Lower Lateral Inspection
Sanitary Sewer Lower Lateral Installation/Repair/Replacement deposit [7] 517$ Increased by 2.5% 32 Sewer Connection Fee Per connection [5] 1,500$ No CPI 33 STORM WATER - POST CONSTRUCTION REGULATION / ANNUAL

INSPECTION
Review of Annual Maintenance Reports of privately maintained post-construction treatment devices flat 223$ Increased by 2.5% Inspection of privately maintained post-construction treatment devices per inspection 447$ Increased by 2.5% Stormwater Re-Inspection/Enforcement per inspection 447$ Increased by 2.5%

MISCELLANEOUS / OTHER FEES
34 Engineering Services - Plan Check hourly 259$ Increased by 2.5% 35 Engineering Services - Inspection hourly 259$ Increased by 2.5% 36 Engineering Services - Clean Water hourly 223$ Increased by 2.5% 37 Engineering Services - Zero Waste hourly 230$ Increased by 2.5% 38 IT Surcharge Fee flat [5] 6% of applicable permit fees 39 FEMA Floodplain Review [10]
Initial Review Fee flat 259$ Increased by 2.5% Additional Fee: Residential Improvements flat 776$ Increased by 2.5% Additional Fee: New construction, substantial improvement and non-residential hourly 259$
Increased by 2.5%
City of Alameda
Master Fee Schedule 38 Public Works

PUBLIC WORKS
Fee No. Fee Name Fee Unit / Type
Notes
Fee / Deposit
Consultant actual cost Actual Cost
40 PW Review of Special Events
Low Impact Special Event flat 648$ Increased by 2.5% High Impact Special Event flat 1,942$ Increased by 2.5% Public Works Special Event Inspection hourly 259$ Increased by 2.5% Public Works Special Event Inspection - outside of City business hours hourly 305$ Increased by 2.5% 41 Curb Painting
Set Up Fee flat Actual Cost
Per 100 l.f. flat Actual Cost
42 Residential Driveway Wingtips hourly 259$ Increased by 2.5% 43 Meter relocation (non-safety related) flat 1,423$ Increased by 2.5% 44 Appeal of PW Director's Decision
Minimum Fee flat 2,070$ Increased by 2.5% 45 Application to PW Director for Development Impact Fee Adjustment deposit 2,328$ Increased by 2.5% 46 Transportation Commission - Request for Appeal of Actions deposit 1,294$ Increased by 2.5% 47 Recycling/Trash Exception Application flat 2,302$ Increased by 2.5% 48 Assessment District Formation deposit 10,224$ Increased by 2.5% 49 Research of Records (non PRA) hourly 259$ Increased by 2.5% 50 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application. hourly 259$
Increased by 2.5%
Notes
[1] Fee set by State.
[2] Permits may require a separate bond deposit according to the City's policy/requirements. [3] Scaled fee categories are used to establish deposit amounts. [4] One sign per parking space or 18 feet of curb.
[5] Fee set by City.
[6] Annual deposit agreement will be set by PW director with utility companies. [7] Deposit set by City.
[8] Minor project: 4 or fewer dwelling units. Major project: 5 or more dwelling units. [9] Residential: 4 or fewer dwelling units. Multi-Family: 5 dwelling units or more. [10] All floodplain development permits will be assessed the initial review fee. Additional review fees and/or pass through consultant fees will be assessed depending on complexity of the project. Definition of Residential for this fee is per FEMA regulations.

City of Alameda
Master Fee Schedule 39 Public Works

PUBLIC WORKS - PARKING VIOLATIONS
PW - Parking Violations
City Hall Lot 12-1.5 AMC 53$ 53$ Increased by 2.5% Clerical Change - Renamed Out of Marked Space - Meter 12-13.3A AMC 53$ 53$ Increased by 2.5% Clerical Change - Renamed Taxi Zone 8-8.7 AMC 37$ 31$ Increased by 2.5% Expired Meter 12-13.7 AMC 47$ 47$ Increased by 2.5% Meter Zone - Time Limit 12-16.4 AMC 47$ 47$ Increased by 2.5% Clerical Change - Renamed City Employee Parking Lot 12-2.4 AMC 53$ 53$ Increased by 2.5% Golf Course - Out of Mark 12-3.3 AMC 53$ 53$ Proposed Increase Clerical Change - Renamed Sweeping Parking Lot 12-4.10 AMC 58$ 53$ Proposed Increase Clerical Change - Renamed 10 Hr Limit - Lot/Garage 12-4.7 AMC 47$ 47$ Increased by 2.5% Clerical Change - Renamed Fire Lane 22500.1 CVC 105$ 31$ Increased by 2.5% Parked Within Intersection 22500(A) CVC 79$ 31$ Increased by 2.5% Parked on Crosswalk 22500(B) CVC 79$ 31$ Increased by 2.5% Parked in Safety Zone 22500(C) CVC 79$ 31$ Increased by 2.5% 15 FT Fire Station Driveway 22500(D) CVC 79$ 31$ Increased by 2.5% Blocking Driveway 22500(E) CVC 63$ 31$ Increased by 2.5% Parking on Sidewalk 22500(F) CVC 84$ 31$ Increased by 2.5% Double Parking 22500(H) CVC 79$ 31$ Proposed Increase Bus Zone 22500(I) CVC 211$ 31$ Increased by 2.5% Wheelchair Curb 22500(L) CVC 237$ 31$ Increased by 2.5% 18 IN From Curb 22502(A) CVC 79$ 53$ Proposed Increase Disabled Parking 22507.8(A) CVC 353$ 53$ Increased by 2.5% Within 15 FT of Fire Hydrant 22514 CVC 79$ 53$ Increased by 2.5% Open Door in Traffic 22517 CVC 42$ 31$ Increased by 2.5% Parked Near Handicapped Access 22522 CVC 316$ 31$ Increased by 2.5% Parking Beach - Prohibited 23-1.4 AMC 47$ 31$ Increased by 2.5% Clerical Change - Renamed For Sale/Repair - Prohibited 6-52.1 AMC 63$ 53$ Increased by 2.5% Clerical Change - Renamed Yellow/White Zone 8-11.1 AMC 79$ 53$ Increased by 2.5% Parking Prohibited All Times/Red Curb 8-7.1 AMC 79$ 53$ Proposed Increase Clerical Change - Renamed Overnight - Large Vehicles 8-7.10 AMC 105$ 53$ Proposed Increase Clerical Change - Renamed Recreational Vehicle/Boat/Trailer Prohibited 8-7.11AMC 79$ 53$ Increased by 2.5% No Parking Specific Hours 8-7.2 AMC 58$ 53$ Increased by 2.5% Parking Time Limit 8-7.3 AMC 53$ 53$ Increased by 2.5% Posted Temporary No Parking 8-7.4 AMC 63$ 53$ Increased by 2.5% 72 HR Limit 8-7.8 AMC 79$ 53$ Increased by 2.5% Oversized Vehicle 8-7.9 AMC 105$ 53$ Increased by 2.5% Out of Marked - Parallel Parking 8-8.1A AMC 77$ 53$ Increased by 2.5% Clerical Change - Renamed Official Vehicle Space 8-8.4 AMC 47$ 47$ Increased by 2.5% Intersection Visibility Zone 8-8.5 AMC 41$ 31$ Proposed Increase Clerical Change - Renamed Parking on Public Grounds 21113 (A) CVC 84$ 31$ Increased by 2.5% Clerical Change - Renamed Vehicle Blocking Class 1 Bikeway 21211 CVC 77$ 30$ Increased by 2.5% Clerical Change - Renamed Parked in EV Space 8-8.9 AMC 46$ 46$ Increased by 2.5% Stop/Parking within 20FT of Crosswalk 22500(N)1A CVC 41$ 30$ Increased by 2.5% Angled Parking 8-8.1 AMC 77$ 53$ NEW - Adding Fee Disabled Space - Cross Hatch 22507.8 CVC (C)(2) 353$ 53$ NEW - Adding Fee Parking in Designated Turn-Out Areas 8-8.6 AMC 47$ 47$ NEW - Adding Fee Two or Three Wheeled Motor Vehicle Parking 8-8.2 AMC 47$ 47$ NEW - Adding Fee Note 1:

Note 2:

APD - Vehicle Violations
Near Construction/Blocking Traffic 22500(G) CVC 63$ 31$ Increased by 2.5% IPS - Parking payments via Mobile payment and Text-To-Pay subject to $ 0.35 transaction fee Turbo Data Systems Citation Processing Online payments subject to a $ 3.95 covenience fee Fine Late PenaltyFee No. Fee Name Section
Fee No. Fee Name Section Fine Late Penalty
City of Alameda
Master Fee Schedule 40 PW - Parking Violations

PUBLIC WORKS - PARKING VIOLATIONS
Fee No. Fee Name Section Fine Late Penalty
In Tube or Tunnel 22500(J) CVC 63$ 31$ Increased by 2.5% On a Bridge 22500(K) CVC 63$ 31$ Increased by 2.5% Commercial Vehicle Wrong Side of Street 22502(B) CVC 63$ 31$ Increased by 2.5% Abandoned Vehicle 22505 CVC 189$ 31$ Increased by 2.5% Set Brake 22515 CVC 53$ 31$ Increased by 2.5% Within 7 1/2 FT of RR Tracks 22521 CVC 63$ 31$ Increased by 2.5% Abandoned Vehicle on Highway 22523(A) CVC 285$ 31$ Increased by 2.5% Abandoned Vehicle on Private Property 22523(B) CVC 189$ 31$ Increased by 2.5% Current Registration 4000(A) CVC 63$ 31$ Increased by 2.5% Front or Side Yards 4-25.2 AMC 53$ 53$ Increased by 2.5% Missing License Plate 5200 CVC 37$ 31$ Increased by 2.5% Position of Plate 5201(E) CVC 37$ 31$ Increased by 2.5% Current License Plate Tabs/Expired Registration 5204/4000 A CVC 100$ 31$ Increased by 2.5% Current License Plate Tabs 5204(A) CVC 37$ 31$ Increased by 2.5% Abandonment of Vehicle/Private Property 8-22.16 AMC 189$ 31$ Increased by 2.5% Failure to Remove Vehicle/Private Property 8-22.17 AMC 189$ 31$ Increased by 2.5% Private Property 8-7.7 AMC 47$ 47$ Increased by 2.5% Expired CF 9850 CVC 63$ 31$ Increased by 2.5% No CF Numbers 9853.2 CVC 63$ 31$ Increased by 2.5% 72 HR - Tow Vehicle 22651 CVC 79$ 31$ Increased by 2.5% Illegal Mooring 23-6.1A AMC 63$ 53$ Increased by 2.5% Trespassing on Wharf 4-28.1 AMC 68$ 53$ Increased by 2.5% City of Alameda
Master Fee Schedule 41 PW - Parking Violations

DEVELOPMENT IMPACT FEE (DIF) SCHEDULE
City Wide DIF (Does not apply to Alameda Point)
Land Use Category Public Safety
General Public
Facilities Transportation Parks Total
Residential
Dwelling, One Family (Subsection 27-3.5f) $2,664 $1,725 $2,799 $10,151 $17,340 Dwelling, Multiple Family (Subsection 27-3.5f) $2,114 $1,368 $2,173 $7,416 $13,071 Accessory Dwelling Unit or Accessory Dwelling Unit-Junior (Subsection 27.3-5f)
Inclusionary Unit (Subsection 27-3.5f) $0 $0 $0 $0 $0
Retail $587 $380 $5,243 $6,210
Commercial or Office $1,078 $694 $5,159 $6,931
Warehouse or Manufacturing $401 $259 $4,341 $5,001
DIF Fees Per 1000 Square Feet of Non-Residential Building Space Nonresidential
DIF Fees Per Residential Unit
$0 $0 $0 $0 $0
City of Alameda
Master Fee Schedule 42 DIF

CANNABIS BUSINESS OPERATOR AND REGULATORY FEES
Fee Description Fee Unit
Cannabis Business Operator Permit LOI Review Fee $1,044 Flat Fee Increased by 2.5% Cannabis Business Operator Permit RFP Proposal Fee $5,107 Flat Fee Increased by 2.5% Cannabis Business Operator Permit RFP Decision Appeal Fee $7,660 Flat Fee Increased by 2.5% Cannabis Business Operator Permit Application Fee $8,820 Flat Fee Increased by 2.5% Cannabis Business Operator Permit Renewal Fee $2,670 Flat Fee Increased by 2.5% Fee Description Fee Unit
Retail Dispensary $8,589 Per Permit Annually Increased by 2.5% Nursery Cultivation $5,222 Per Permit Annually Increased by 2.5% Testing Laboratory $5,222 Per Permit Annually Increased by 2.5% Manufacturing: Volatile $9,865 Per Permit Annually Increased by 2.5% Manufacturing: Non-Volatile $8,936 Per Permit Annually Increased by 2.5% Delivery-Only Dispensary $6,963 Per Permit Annually Increased by 2.5% Distribution (in conjunction with Cultivation or Manufacturing only) $5,107 Per Permit Annually Increased by 2.5% Delivery (in conjunction with Retail only) $4,294 Per Permit Annually Increased by 2.5% Cannabis Business Operator Application And Permit Fees
Cannabis Business Regulatory Program Fees
City of Alameda
Master Fee Schedule 43 Cannabis

SPECIAL EVENT PERMIT FEE
1 Charitable Solicitation per AMC 5-20.2 -$ Non-profit applicants only 2 Street Banner Permit -$ Non-profit applicants only 3 Block Party Permit 100.00$ Includes Admin Fees, not subject to CPI No CPI 4 Bingo Permit per AMC 5-24 55.00$ Includes Admin Fees, not subject to CPI No CPI 5 Alameda Point Events See High/Low Impact Activity Fees 6 Film/Photography Permit per AMC 5-30 See High/Low Impact Activity Fees 7 Parades/Street Fairs/Car Shows/Races See High/Low Impact Activity Fees 8 Food Trucks (per event, every 3 trucks) 261.83$ See Notes below for applicability Increased by 2.5% 9 Public Works* Police Risk Manager Fire Processing Fee Tech Fee Community Planning Fee
High Impact 1,940.92$ 131.81$ 128.49$ 429.20$ 120.95$ 175.97$ 14.66$ 3,123.42$ Increased by 2.5% Low Impact 647.16$ 87.88$ 128.49$ 214.60$ 120.95$ 79.20$ 6.60$ 1,405.83$ Increased by 2.5% Engineering Stormwater Solid Waste
High Impact 1,034.57$ 446.54$ 459.81$ Increased by 2.5% Low Impact 193.99$ 223.27$ 229.90$ Increased by 2.5% Additional Services, when required Fee Rate
Alameda Recreation and Parks Department 110.99$ per hour Increased by 2.5% Public Works Inspection 258.64$ per hour Increased by 2.5% PW Inspection - Outside of Business Hours 290.54$ per hour Increased by 2.5% Building Plan Check [2] 248.05$ per hour Increased by 2.5% Building Inspection 248.05$ flat fee Increased by 2.5% Building Inspection - Outside of Business Hours 280.85$ per hour Increased by 2.5% Police Presence 175.74$ per officer/per hour @ Sgt. Rate Increased by 2.5% Fire Inspection 390.53$ per hour Increased by 2.5% Fire Inspection - Outside of Business Hours Actual overtime costs per inspection Other Fire Personnel and Equipment See Fire Dept. fee schedule Fire Dept. Tent Permits (Includes plan review and first inspection) 456.13$ per permit Increased by 2.5%
456.13$ per permit Increased by 2.5%
570.93$ per permit Increased by 2.5%
684.70$ per permit Increased by 2.5%
798.48$ per permit Increased by 2.5%
1,026.03$ per permit Increased by 2.5%
Note: Special Event permit fees are waived for events by non-profit organizations. Applicant must provide proof of non-profit status upon request and applications must be submitted according to City timelines to qualify.

Notes
High/Low Impact Activity Fees [see notes]
Event Type
Review Fees by Department/Function Admin Fees
181.43$
120.95$
*Breakdown of Public Works Review Fees
Special Event Permit Type Fee
> 30,000 square feet
Special Event Permit Fees*
Up to 400 square feet
401 to 1500 square feet
1501 - 4,500 square feet
4501 - 15,000 square feet
15,001 - 30,000 square feet
Total PW Fees For questions about Public Works fees, contact: 510-747-7900 or [email protected]$1,940.92
$647.16
TotalPlanning and Building
[2] Required for structures, tents, stages, ramps, ADA access, exiting, temporary power, generators, and other items per the Building Official. [1] High Impact: A special event requiring any street closures, anticipated 500 or more attendees, or events lasting 2 days or more.

Notes:
[3] Food trucks are only permitted at private property, Alameda Point, College of Alameda, South Shore Shopping Center, and the Marina Village and Harbor Bay business parks. Food trucks may also operate at other locations if they are part of a larger Special Event, such as a street festival, and are covered under the event’s Special Event Permit. Contact ARPD at 510-747-7529 for authorization and approval in City parks and East Bay Regional Park District at 1-888-327-2757 for Crown Memorial Beach. *For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for a department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.

City of Alameda
Master Fee Schedule 44 Special Event

← All documents from this meeting