John Shoemaker
From: BEAUCHAMP, MARGO J [[email protected]]
Sent: Wednesday, December 21, 2011 6:13 PM
To: John Shoemaker
Subject: CPTED Inspection
John,
Today, 12/21/2011, I did the CPTED interior inspection for 15 Argonaut. The interior passes the CPTED inspection. I suggested that Ambry Genetics install a card reader for the first-floor electrical room which is adjacent to an exit door and roll-up door.

Tonight for the nighttime inspection of Ambry Genetics' exterior lighting, more than three-quarters of the wall-mounted exterior lighting and the parking lot lighting were not illuminating the building or parking lot. '
I will approve the TC of O for 15 Argonaut, but I would request that all exterior lighting and light poles be operational for another CPTED nighttime inspection either on Thursday, 12/22/2011, or next week.

Also, the exterior lighting and parking lot lighting at 31 Argonaut {S&K Towing) was not illuminating the building or parking lot this evening. I asked the employee Kevin to inform Craig about the lighting not illuminating the areas.

Thank you.

Margo Beauchamp
Crime Prevention Specialist
Aliso Viejo Police Services
Orange County Sheriff's Department
PH: (949) 425-2563
Fax: (949) 425-3899
12/22/2011 1716
•
•

SUPERIOR

TEST & BALANCE

TEST AND BALANCE
REPORT
PROJECT: AMBRY GENETICS
LOCATION: 1 5 ARGONAUT, ALISO VIEJO, CA 92650
REPORT DATE: NOVEMBER 2 1, 20 1 1
CONTRACTOR: TURNER & SONS
ARCHITECT: MARK A. GRISAFE AIA
ENGINEER: KRUSIC & ASSOCIATES
840 W LEADORA AVENUE, GLENDORA CA 91741
TEL: 626.771.1012 FAX: 626.963.8258
EMAIL: [email protected] 1717
•
•
•
INSTRUMENTATl N:

DIGITAL MAN METER
F"L WH □□O

TACH METER
ALN R BAL METER EBT-721
ALN R BAL METER EBT-722
JAQUET 252

DIGITAL VOLT-AMP METER
□TATING VEIN ANEM METER
FLUKE TS-600
LCA30 VA
DESCRIPTl N F" TERMS:

AKATMCDCECFMCRDDFHFLFPMGPMHPLDLRN/ANLSAPSIGRPMSF"- SPSWESWRswsTPVELf1pFREE AREA OF" REGISTER, IN sc_iuARE F"EET

ATMOSPHERIC PRESSURE
CEILING DIF"F"USER, SUPPLY

CEILING REGISTER, EXHAUST

CUBIC FEET PER MINUTE

CEILING REGISTER, RETURN

DIRECT DRIVE MOTOR
READINGS TAKEN WITH FL WH □□ D, ND AK FACTOR

FULL LOAD, AMPERAGE

FEET PER MINUTE

GALLONS PER MINUTE

RSE POWER
LINEAR DIF"l'"USER, SUPPLY

LINEAR REGISTER, RETURN

NOT AVAILABLE OR T APPLICABLE

NOT LISTED

OUTSIDE AIR
POUNDS PER Sc_iUARE INCH, READ BY GAUGE

REVOLUTIONS PER MINUTE

SERVICE FACTOR, AMPERAGE
STATIC PRESSURE, IN INCHES 01'" WATER

SIDE-WALL REGISTER, EXHAUST

SIDE-WALL REGISTER, RETURN

SIDE-WALL REGISTER, SUPPLY

THERMALLY PROTECTED, AMPERAGE

VELOCITY (FEET PER MINUTE)
DIF"F"ERENTIAL PRESSURE
1718
• ~ l
~
<-'s UP E RIO R

TEST & BALANCE
Fan Test Report
Project: Ambry Genetics - Aliso Viejo, CA

EQUIPMENT DATA EQUIPMENT DATA EQUIPMENT DATA
Unit Name AC-19 AC-20 AC-21
Location / Area Served Roof 2nd Floor Roof 2nd Floor Roof 2nd Floor Manufacturer/ Model Yori< XP048 York XP036 York XPO&O
Serial Number N1K1326029 N1K1326289 N1G1196060
Motor Make Marathon Marathon Marathon
Motor HP / RPM/ Frame 1.5 1725 56HZ 1.5 1725 56HZ 1.5 1725 56HZ Volts/ Phase / Hertz 460 3 60 460 3 60 460 3 60
F.L. Amps/ S.F. 2.6 1.15 2.6 1.15 2.6 1.15
Motor Sheave Diam./Bore VL44 x 7/8" VL44 x 7/8" VL44x 7/8" • Fan Sheave Diam./Bore AK56 X 1" AK64 x 1" AK56 X 1"
Belt Size / # of Belts A36 1 A37 1 A36 1
Sheave Closed % 10% 60% 10%
Sheaves Center to Center 12 1/2" 12" 121/4"
TEST DATA DESIGN ACTUAL DESIGN% DESIGN ACTUAL DESIGN% DESIGN ACTUAL DESIGN% Total Fan Airflow 1600 1590 99% 1600 1645 103% 2000 1998 100% Total Outlet Airflow 1600 1590 99% 1600 1645 103% 2000 1998 100% Return Airflow 1450 1426 98% 1500 1541 103% 1500 1509 101% Minimum Outside Air 150 164 109% 100 104 104% 500 489 98% S.P. Supplv / Return 0.54"/0.39" 0.48"/0.38" 0.49"/0.46" External S.P. 0.35" 0.93" 0.35" 0.86" 0.35" 0.95"
Total S.P. - 1.28" - 1.16" ...... ' - 1.34"
Fan Sneed <RPM) - 1051 - - 983 - - 1062 - Voltaae 460 486/482/481 460 485/483/481 460 486/484/482 Amoeraae T1/T2/T3 2.6 2.0/1.9/1.9 2.6 1.9/1.9/1.8 2.6 2.0/2.0/1.9 NOTES:
• 1
1719
• ~ t
~
('ws, U PE, RI OR

TEST & BALANCE
Fan Test Report
Project: Ambry Genetics - Aliso Viejo, CA

EQUIPMENT DATA EQUIPMENT DATA EQUIPMENT DATA
Unit Name AC-22
Location / Area Served Roof 1st Floor
Manufacturer/ Model York XP090
Serial Number N1K1314851
Motor Make Marathon
Motor HP/ RPM / Frame 3 1725 56HZ
Volts/ Phase / Hertz 460 3 60
F.L Amps/ S.F. 4.6 1.15
Motor Sheave Diam./Bore VM50 x 7/8"
• Fan Sheave Diam./Bore AK61 x 1"
Belt Size/# of Belts A49 1
Sheave Closed % 70%
Sheaves Center to Center 171/4"
TEST DATA DESIGN ACTUAL DESIGN% DESIGN ACTUAL DESIGN% DESIGN ACTUAL DESIGN¾ Total Fan Airflow 3000 3015 101%
Total Outlet Airflow 3100 3015 97%
Return Airflow 2475 2377 96%
Minimum Outside Air 625 638 102%
S.P. Supply/ Return 0.80"/0.67"
External S.P. 0.35" 1.47"
Total S.P. - 1.79"
Fan Speed (RPM) - 1246 -
Voltaqe 460 480/482/483
Amperaqe T1ff2ff3 4.6 4.4/4.2/4.1
NOTES:
• 2
1720
•
Air Outlet Test Report
Project: Ambry Genetics - Aliso Viejo, CA

DESIGN PRELIM PRELIM FINAL
SYSTEM NAME / AIRFLOW AIRFLOW %OF AIRFLOW ¾OF AIRFLOW ¾OF AREA SERVED # TYPE SIZE (CFM) (CFM) DESIGN (CFM) DESIGN (CFM) DESIGN NOTE# AC-19
RM 233 1 CD 24" X 24" 200 247 124% 190 95% 1
RM232 2 CD 24" X 24" 200 228 114% 200 100% 1
RM231 3 CD 24" X 24" 400 401 100% 415 104% 1
RM234 4 CD 24" X 24" 200 317 159% 194 97% 1
RM235 5 CD 24" X 24" 200 177 89% 190 95% 1
RM236 6 CD 24" X 24" 200 220 110% 199 100% 1
RM237 7 CD 24" X 24" 200 233 117% 202 101% 1
• 1600 1823 114% 1590 99% 1
RM233 R1 CD 24" X 24" 175 236 135% 184 105% 1
RM 232 R2 CD 24" X 24" 175 166 95% 171 98% 1
RM 231 R3 CD 24" X 24" 400 331 83% 381 95% 1
RM234 R4 CD 24" X 24" 175 226 129% 183 105% 1
RM235 RS CD 24" X 24" 175 154 88% 172 98% 1
RM236 R6 CD 24" X 24" 175 144 82% 168 96% 1
RM237 R7 CD 24" X 24" 175 139 79% 167 95% 1
1450 1396 96% 1426 98% 1
NOTES: 1 Adjusted fan rpm from 1147 to 1051 followinQ initial readinQS. 2 Notes correspond to 3
Note# above. 4
• 3
1721
• i~IJPEKIO!K
~ TEST & BALANCE
Air Outlet Test Report
Project: Ambry Genetics - Aliso Viejo, CA

DESIGN PRELIM PRELIM FINAL
SYSTEM NAME / AIRFLOW AIRFLOW %OF AIRFLOW %OF AIRFLOW %OF AREA SERVED # TYPE SIZE (CFM) (CFM) DESIGN (CFM) DESIGN (CFM) DESIGN NOTE# AC-20
RM 226 1 CD 24" X 24" 200 50 25% 198 99% 1
RM225 2 CD 24" X 24" 200 61 31% 199 100% 1
RM228 3 CD 24" X 24" 400 340 85% 402 101% 1
RM229 4 CD 24" X 24" 400 469 117% 420 105% 1
RM230 5 CD 24" X 24" 400 507 127% 414 104% 1
1600 1427 89% 1645 103% 1
• RM226 R1 CD 24" X 24" 175 209 119% 184 105% 1
RM225 R2 CD 24" X 24" 175 189 108% 182 104% 1
RM228 R3 CD 24" X 24" 375 316 84% 395 105% 1
RM229 R4 CD 24" X 24" 400 275 69% 395 99% 1
RM230 R5 CD 24" X 24" 375 287 77% 385 103% 1
1500 1276 85% 1541 103% 1
NOTES: 1
2 Notes correspond to 3
Note # above. 4
• 4
1722
• l~.UPE.RIO·K
~ TEST & BALANCE
-=
Air Outlet Test Report
Project: Ambry Genetics - Aliso Viejo, CA

DESIGN PRELIM PRELIM FINAL
SYSTEM NAME / AIRFLOW AIRFLOW %OF AIRFLOW %OF AIRFLOW %OF AREA SERVED # TYPE SIZE (CFM) (CFM) DESIGN (CFM) DESIGN (CFM) DESIGN NOTE# AC-21
RM224 1 CD 24" X 24" 335 287 86% 362 108% 349 104%
RM224 2 CD 24" X 24" 335 312 93% 268 80% 351 105%
RM224 3 CD 24" X 24" 335 396 118% 335 100% 334 100%
RM224 4 CD 24" X 24" 335 472 141% 386 115% 322 96%
RM224 5 CD 24" X 24" 325 548 169% 425 131% 312 96%
RM224 6 CD 24" X 24" 335 74 22% 474 141% 330 99%
2000
•
2089 104% 2250 113% 1998 100%
RM224 R1 CR 24" X 24" 375 423 113% 446 119% 367 98%
RM224 R2 CR 24" X 24" 375 495 132% 514 137% 393 105%
RM224 R3 CR 24" X 24" 375 410 109% 430 115% 364 97%
RM224 R4 CR 24" X 24" 375 434 116% 461 123% 385 103%
1500 1762 117% 1851 123% 1509 101%
NOTES: 1
2 Notes correspond to 3
Note # above. 4
• 5
1723
•
Project:

SYSTEM NAME /

AREA SERVED
AC-22
RM 122
RM 122
RM 122
RM 120
RM 122
RM 122
RM 122
RM 122
• RM 122
RM 118
RM 117
Corridor
RM 123
RM 123
RM 123
NOTES:

Notes correspond to
• Nole # above.
~ i~SUPE,RIO:R
~ TEST & BALANCE
---=
Air Outlet Test Report
Ambry Genetics - Aliso Viejo, CA

DESIGN PRELIM PRELIM
AIRFLOW AIRFLOW %OF AIRFLOW
# TYPE SIZE (CFM) (CFM) DESIGN (CFM)
1 CD 24" X 24" 240 224 93% 170
2 CD 24" X 24" 240 53 22% 264
3 CD 24" X 24" 240 493 205% 364
4 CD 6" x6" 100 233 233% 207
5 CD 24" X 24" 240 274 114% 180
6 CD 24" X 24" 245 402 164% 264
7 CD 24" X 24" 245 66 27% 227
8 CD 24" X 24" 245 37 15% 225
9 CD 24" X 24" 245 316 129% 214
10 CD 8" X 8" 100 132 132% 86
11 CD 8" X 8" 100 136 136% 87
12 CD 24" X 24" 200 62 31% 191
13 CD 24" X 24" 220 64 29% 134
14 CD 24" X 24" 220 234 106% 156
15 CD 24" X 24" 220 143 65% 185
3100 2869 93% 2954
FINAL
%OF AIRFLOW

DESIGN (CFM)
71% 228
110% 229
152% 231
207% 105
75% 252
108% 236
93% 233
92% 235
87% 232
86% 95
87% 102
96% 206
61% 209
71% 210
84% 212
95% 3015
1 Adiusted fan mm from 1161 to 1246 followina second orelim readinas. 2 3
4 6
%OF
DESIGN NOTE#
95% 1
95% 1
96% 1
105% 1
105% 1
96% 1
95% 1
96% 1
95% 1
95% 1
102% 1
103% 1
95% 1
95% 1
96% 1
97% 1
1724
• i~,UPERIOR
~ TEST & BALANCE
Air Outlet Test Report
Project: Ambry Genetics - Aliso Viejo, CA

DESIGN PRELIM PRELIM FINAL
SYSTEM NAME / AIRFLOW AIRFLOW %OF AIRFLOW %OF AIRFLOW %OF AREA SERVED # TYPE SIZE (CFM) (CFM) DESIGN (CFM) DESIGN (CFM) DESIGN NOTE# AC-22 (Cont)
RM 122 1 CR 24" X 24" 315 382 - 421 - 330 - 1,2
RM 122 2 CR 24" X 24" 325 296 - 340 - 341 - 1,2
RM 123 3 CR 24" X 24" 220 211 - 240 - 231 - 1,2
RM 122 4 CR 24" X 24" 325 237 - 282 - 290 - 1,2
RM 122 5 CR 24" X 24" 325 212 - 249 - 275 - 1,2
RM 122 6 CR 24" X 24" 325 173 - 200 - 264 - 1,2
RM 122 7 CR 24" X 24" 325 154 - 175 - 261 . 1,2
•
RM 123 8 CR 24" X 24" 220 96 . 108 - 189 . 1,2
RM 123 9 CR 24" X 24" 220 143 . 167 . 196 . 1,2
2600 1904 . 2182 - 2377 . 1,2
NOTES: 1 Balanced returns to a return total of 2475 CFM to allow minimum OSA reauirement of 625 CFM.

Notes correspond to 2 Adiusted fan mm from 1161 to 1246 followino second orelim readinas.

Note # above. 3
• 7
1725
•
co
•

TESTING, ADJUSTING AND BALANCING BUREAU
THE PROFESSIONAL'S CHOICE'"
CJ'fiis certifies tfiat
Superior 'lest ana (}3aCance
fias compfeted tfie requirements of certification as a
<Testing, Jldjusting and <Bafancing Contractor
on
Octo6er 29, 2010
~! ,J.11,~ ffehl-;kL
Labor Co-Gnairman Management Co-Chairman
ICB Co-Chairman
TB1153908C December 31, 2012
Certification No. Expiration Date
•
1726
• •

STATE OF CALIFORNIA
Pt1rsu<1nl to Chapter 9 of Division:, of the llusincss and Proiessions Code Jnil the Rules and Regulations of the Contrauors Stalt· License !Joard, the Registrar of Contractors does hereby issue this liC<!nse lo:

PARAGON INCORPORATED d&a. SUPERIOR TEST

AND BALANCE
In engage in the business or .ict in th,~ capacity of a contractor in the following cl.issificalion(s):
062 - AIR AND WATER BALANCING
•
Witness my hand and srnl this day,
March 7, 2008
Issued March 6, 2008 ~(:f-L Registrar of Contractors
j~ nul tran~forrable, ;ind sh,11! he returned tu !he ~c-gl:-lr:i1 fhis lkt~n..;f• b !h1: prnw•ny iii th•.' Regfstrt.1r of Conirannrs, 911916 J llpon dem,rnd wh1~11 sus1}f~11dt!tl. rc'.\.'flb:,!, or inv;ilirl.ltcd L N b ----.....- •-'-==--='-.;..,;- •----------k="-'"=n~ .. • ,_ca_"_'"_· _",..1_:,.;:·~,,;1~n=ll .. •s_v~--~-rl-ii_,"_''-" ... ;n=1.!\=V1_=•d,,. • .,...,,.,.._~-=~-~~ . \I.J~,fl_!V l.'-"71 Ii,,~ l!'ii'(it 111),11~1 1727
. - City o9\liso Viejo
Building and Safety Division
12 Journey, Suite 100
Aliso Viejo, CA 92656
P: (949) 425-2540
F: (949) 425-3899
APPLICATl~FOR BUILDING PERMIT

AND CERTIFICATE OF OCCUPANCY
Inspection request line 949-425-2545
Street Address: __ .:.c15e...._. 0A-"-R"'G=.cO=.cNccA-"U'-'T'---------- 68318 Plan Review No.:
68318
Job Information Permit Number I
1------------>------------
ApUSte: ____ _ Lot: __ APN: ______ _ The followinq work is authorized by this permit Tract: Cross St: ISl Structural ISl Plumbina ISl Electrical !SJ Mechanical Applicant: MARK GRISAFE
Street Address: 5618 .=Ee.. ;eC.o,O::;Ne..A::.N:..:T...:Sc.:Se.Tc_ ______ _ Type of Project
D New D Addition D Occupancy Permit
D Alteration D Demolition
City: LONG BEACH Zio: __ ~9~0~80=8'-- D Repair 1:81 Tenant Improvement State: CA Phone: (562) 420-1035 Cell:

Owner: AICI, LLC S9£t
NEW MEZZANINE 4407
Street Address: ---=2-"'32=-1'--·c.cR.ccO.ccS.=E.=Cc.Rc.Ac.N.=S~A~Vc.cE~______ Tl 4407 City: EL SEGUNDO Zio: __ "'90~2'-'4.=5 __ I-'-'--------''-'-"-'-- State: CA Phone: (310) 725-0006 Cell:

Ena/Arch: MARK GRISAFE
Phone: _(562) 420-1035 License #: C28845

LICENSED CONTRACTORS DECLARATION
-------------
I HEREBY CLAIM, UNDER PENALTY OF PERJURY, THE FOLLOWING i============-============i STATEMENT: THAT I AM LICENSED UNDER PROVISIONS OF CHAPTER 9 I ::Z.'.:o~ni~n~g.!.A~p~p~ro~v".'.e::d'...B~y~:_:J:':....LQWE:.'::::~==========::_j COMMENCING WITH SECTION 7000 OF DIVISION 3 OF THE BUSINESS IAND PROFESSIONS CODE, AND AT THIS TIME MY CONTRACTORS Remarks/Special Conditions/Project Description LICENSE IS CURRENT, ACTIVE AND IN FULL FORCE. PERMIT TENANT IMPROVEMENT PHASE 2 FOR AMBRY Contractor: RAND C ELECTRICAL CONTRACTORS GENETICS. BUILD NEW 2ND FL MEZZANINE 4407 SF Street Address: 21113 ~JU=A~N=A~V=E~--------- WITH NEW OFFICES AND RESTROOMS BELOW. NEW City: HAWAIIAN GARDENS Zio: 90716 HVAC SYSTEM AT ROOF TOP. MEP PERMITS ARE State:__fL Phone:_(562) 860-3430 Cell: ______ INCLUDED.

UC.#: 904308 Exo. Date: 10/31/2011 CLASS: B, C10 ef? CONTRACTOR TO PROVIDE ACCESS TO ROOF & ATTIC TENANT: AMBRY GENETICS c~.

C&D APPROVED UNDER P~E~MIT 682541{~ _. 7---.__j WORKERS' COMPENSATION DECLARATION , I HEREBY CLAIM, UNDER PENALTY OF PERJURY, ONE OF THE '--. ~:.,,- r::.:

FOLLOWING STATEMENT: ,-- '/
□ I HAVE AND WILL MAINTAIN A CERTIFICATE OF CONSENT TO SELF - f _ ',.

INSURE FOR WORKERS COMPENSATION, AS PROVIDED FOR BY ·4' (""' SECTION 3700 OF THE LABOR CODE FOR THE PERFORMANCE OF THE ~ '-----..

OR WHICH THIS PERMIT IS ISSUED. ·,::~

HAVE AND WILL MAINTAIN COMPENSATION INSURANCE AS
R au ED BY SECTION 3700 OF THE LABOR CODE FOR THE ~-----------------.0,.,.------1 PERFORMANCE OF THE WORK WHICH THIS PERMIT IS ISSUED. This permit shall expire if the:building.or worli aili~rized.by , Workers' Comoensation Carrier Policy# Exp. Date such permit is suspended or ~bando,nedfor ape[iod'of 1~0 .·.· SOUTHERN INS co WSI0029363 9/10/2011 days. • • • ••
CERTIFICATE OF WORKERS COMPENSATION EXEMPTION All work shall conform to the 2010 C.B.C., 2010 C.M.C., (THIS SECTION NEED NOT BE COMPLETED IF WORK IS $500 OR LESS) 2010 C.P .c. and the 2010 C.E.C. 9 CERTIFY UNDER PENAL TY OF PERJURY THAT IN THE PERFORMANCE l------------------------1 OF THE WORK FOR WHICH THIS PERMIT IS ISSUED, THAT I SHALL NOT Grouo/Division/Tvoe Hiah Fire Hazard EMPLOY ANY PERSON IN A MANNER so AS TO BECOME SUBJECT TO Jl/S, IIIB O Yes O No THE WORKERS COMPENSATION LAWS OF CALIFORNIA, AND AGREE l~::::'.::::':::==========----_:=-:...:._::__.::_~:..:._-I THAT IF I SHOULD BECOME SUBJECT TO THE WORKERS Valuation Fire Sorinklers COMPENSATION PROVISIONS OF SECTION 3700 OF THE LABOR CODE _$35Q,204.00 [81 Yes O No THAT I ~HAI I FORWITH (:OMPI Y WITH THO!=:;F PR0\/1!=:ION~ \_:'.:==:'::::::::::::::::::=======----_'.'.:'...'...:.::...._::::'....:.:::.__\ ""'.ar~ing· Failure to secure work.ers' compensation coverage is unlawful, and shall subject an employer to ~~~:~:~~'.i~:~~e~~~r;~!i~~d'fo~ii r~~~~3}~ui,a1~~ f~~~: ~~~~i~~s~~ ::~~1:r~~i~0r:!1 of Structural _$ ..2 ,4_QJL9J3_

OWNER BUILDER DECLARATION

I AM EXEMPT FROM THE CONTRACTORS LICENSE LAW FOR THE
FOLLOWING REASON:
□ I, AS OWNER OF THE PROPERTY, OR MY EMPLOYEES WITH WAGES

AS THEIR SOLE COMPENSATION, WILL DO THE WORK, AND THE

STRUCTURE IS NOT INTENDED FOR, OR OFFERED FOR SALE (SECTION 7044, OF THE BUSINESS AND PROFESSIONS CODE)
□ I, AS OWNER OF THE PROPERTY AM EXCLUSIVELY CONTRACTING

WITH LICENSED CONTRACTORS TO COMPLETE THE PERMITTED
PROJECT UNDER THE PROVISIONS OF SECTION 7044, OF THE BUSINESS & PROFESSIONS CODE.
f certify that I have read this application and state that the above information is correct, and that I am the owner or the duly authorized agent of the owner. I agree to comply with all city and state laws relating to building construction. I hereby authorize representatives of the City of Aliso Viejo to enter upon the ohn1,o. mont;,_,.,.,,,-1 nmno..+,, fnr inc,,n,o,-.fir,n n,,m,.,c,.::,c, b :cif:i/1 b dJe v 9- -)- I r
Print Applicant's/Agent's Name Date
Electrical _$J00,84 --
Mechanical __ $47._3_6 __
Plumbina$52.57
Plan check
Issuance $69.32
Microfilm __ $80.00
Water Quality
Total Citv Fee Due _$2,680.07
Seismic Fee __ $74 !-i_9 __
SB1473 -~~--
Total Amount Paid
Issuance ApprovedJoanna Stey§nS
Date Issued
VVed._SeD_I . .20.1-1 I
Receipt Number
_ 13075
Permit Number: _68318_ 1728

CONSTRUCTION AND PLANNING POOL AND SPA
APPROVALS Permit# APPROVALS Permit#
Date lnsp. Date lnsp.

1. Temporary Electrical Service or Pole ' '

2. Soil Pipe--Underground 1k\\ l 1 fY ') 1. Pool & Equipment Location

3. Water Pipe--Underground / Underslab I 2. Steel Reinforcement

4. Water Service 3. Electrical Bonding

5. Property Sewer/ House Connection 4. Rough Plumbing & Pressure Test

6. Electrical Conduit--Underground 5. APPROVAL TO COVER--GUNITE

7. Gas Line Underground & Test 6. Electrical Conduit--Underground ~ .

8. Footings & Steel UferO ~III I/ ,u'--, 7. Gas Pipe, O Underground, Test

9. Foundation--Slab on Grade I ",1,,J Jt,. il ?(";'\ 8. Backwash Lines, P-Trap, OUnd. ' 10. Retaining Wall Footing 9. Backwash & Receptor--Final

11. Pre--Grout 0 Drainage 0 10. Fencing and Access Approval

12. Gas Pipe-Underground & Test 11. APPROVED FOR PLASTERING

13. Rough Plumbg./Top Out/Shower Pan 1d)4o/r~l -~ 12. Heater & Vent--Final I ' 14. Roof Drains & Overflows . 13. Plumbing System--Final

15. Rough Electrical--Condult \~ \Jl.lli (J[C ~l>I ' 14. Electrical--Final

16. ,£'1ough Electrical Wiring V:l[Jii,(;l Oi±; t::.!__ u~~ 15. Solar System--Final

17. Rough Heatin_g & Air Conditioning JJ/lthl ~ 16. POOL/ SPA SYSTEM FINAL V V --....J

18. Rough Factory Fireplace FIRE DEPT. REQUIREMENT

19. Ducts, Ventilating 11, (\i:;,w¼ 10\X,(<J'S APPROVALS Permit # Dale lnsp.

20. Fire Dampers 1. UNDERGROUND HYDRO

21. Floor Sheathing 2. PRODUCT PIPING OGAS 0 OIL

22. Roof Sheathing 3. UNDERGROUND FLUSH

23. Roof Framing 4. UND. STAG. TANK OGAS 0 OIL

24. Approved to Cover Exterior 5. OVERHEAD HYDRO

25. Rough Frame and Flashing vdv./rt r\1'C, 6. DRY CHEMICAL

26. 'T' Bar Ceiling/Elect./Mechanical
------- I /hi ~ 7. DRY STANDPIPE

27. Insulation ~ 10(,i0(1, )ct\\ ·~ f-J"-, 8. FIXED SYSTEM FINAL

28. Lathing O Interior O Exterior
' '

9. FIRE PREVENTION FINAL

29. Drywall Nailing 11/ 10/v,__ UC\ NOTES:

30. Electric Power Meter Final I, AS THE CONTRACTOR, HEREBY AFFIRM UNDER,PENALTY

31. Final Electric OF PERJURY THAT I AM A CERTIFIED HOME IMPROVEMENT CONTRACTOR UNDER THE PROVISIONS OF SECTIONS 7150

32. Final Sign AND 7151 OF THE STATE OF CALIFORNIA BUSINESS AND PROFESSIONS CODE.

33. Hood or Canopy Final

34. Final Factory Fireplace DATE: CONTRACTOR:

35. Final Mechanical .J~ .. lno ... .-.. -' if. ,n ~· -: n --;[ '1./,.,. ' ... 7o J;;,.,

36. Final Plumbing / d? r ·1 {},1/1ul1~, {) il1 C 0 "J
' ' '

37. Water Service Final/Release i <,;,?/p, T'~ fs,+R._ /()/!_ ///1t.J,f11 CJ(\.

38. Gas Final Including Connectors /; I ~

39. Solar Domestic--Final

40. Re-roof Final

41. Retaining Wall Final

42. Handicap Regulations

43. Landscape Final

44. Zoining--Final

45. Engineering--Final

46. Health--Final

47. Final Structure & Building

48. Gas Release

49. Electric Release
... Inspector's Initials & Name
. I .. 1729
• •

CITY OF ALISO VIEJO
Community Development Department
12 Journey Suite 100
Aliso Viejo, CA92656
Phone: (949) 425-2540

ROAD FEE WORKSHEET
DATE:

PROJECT ADDRESS;_: --;/--.L...L..../.~~~M.tilc--c.------------------ PROJECT NAME,_: _.J_J_~!.LJi.~~~Ll!.=c:i!c=.,__ _____________ _ PREPARED BY:-~~"--"-"--'--'~"-'-'=~--

SAN JOAQUIN HILL TRANSPORTATION CORRIDOR AGENCY
SJHTC-A (Make check payable to: City of Aliso Viejo)
SFD units X$ i;i/unit - $
MFD units X$ i;i/unit - $
COMM Mar- sg ft X$ UJ,.J--3 i;i/sgft = $ &f 11, J../5SCa/ '
COASTAL AREA ROAD IMPROVEMENTS AND TRAFFIC SIGNALS (CARITS):

ZONE 2D (Make check payable to the City of Aliso Viejo) SFD units X$ i;i/unit = $
MFD units X$ i;i/unit = $
COMM A?tfr sg ft X$ [.S71p i;i/sgft- $ W (pfU,/$ 4!;)
MOUL TON PARKWAY (Make check payable to the City of Aliso Viejo) SFD
MFD
COMM
units X $
units X $
sgft X$ _ _;c.,]/c.j
p/unit = $ ________ _
p/unit - $
p/sqft - $ -f:/1:--,-----------,,S=--_ J_,,~~b ____,~c)~,.

COMMENTS:------------------------------
1730
CITY OF ALIS"'EJO - PERMIT/ PLAN REVa APPLICATION
JOB ADDRESS: 1-s A'Pf:fJN6< r APN#/TRACT#/LOT# =
•
PROPERTY OWNER'S NAME: b:I C ( LL C
ADDRESS: :2--32-/ f2t;;§fEf/"iN.3 'H: 22."::0CITY: t'I-- Sf;fJJt-.PC) ZIP CODE:Loz.4-J PHONE NUMBER: ~Q 72S.- - CJ:Xb
ARCH./ENGINEER:

ADDRESS: CITY: ZIP CODE:

LICENSE NUMBER: PHONE NUMBER:

CONTRACTOR'S NAME: PHONE NUMBER:

ADDRESS: CITY: ZIP CODE:

CONT. LICENSE CLASS I NUMBER: EXP. DATE:

WRITTEN DESCRIPTION OF WORK: SQUARE FOOTAGE:
(4/, /,JCJ.d:>/Ai, F{-P-,

PUBLIC WORKS SCREENING QUESTIONS

LANDSCAPE PERMIT
q2S SUB.Mt

SPRINKLERE
DOES THIS PROJECT INCLUDE NEW LANDSCAPE OR LANDSCAPE RENOVATIONS FOR: YES NO RESIDENTIAL PROJECTS - 5,000 SF AREA OR MORE?
COMMERCIAUHOA/PROPERTY MGMT PROJECTS - 2,500 SF AREA OR MORE?

IF YES TO EITHER QUESTION, LANDSCAPE PERMIT IS REQUIRED

WATER QUALITY PERMIT YES NO
DOES THIS PROJECT REQUIRE ANY MOVEMENT OF SOIL?
DOES THIS PROJECT REQUIRE ANY OUTSIDE STORAGE OF MATERIALS? V

IF YES TO EITHER QUESTION, WATER QUALITY PERMIT IS REQUIRED

CONSTRUCTION AND DEMOLITION C&D PERMIT YES NO
DOES THIS PROJECT INVOLVE MORE THAN 5,000 SF?
IS THE TOTAL VALUE OF THE PROJECT $50 000 OR MORE?

IF YES TO EITHER QUESTION, C&D PERMIT IS REQUIRED

WATER POLLUTION PREVENTION YES NO
j DOES THIS PROJECT INCLUDE ONE ACRE OR MORE OF DISTURBED SOIL? j i7

IF YES, STORM WATER POLLUTION PREVENTION PLAN (SWPPP, STATE) IS REQUIRED YES NO ! IS THIS A NON-RESIDENTIAL PROJECT THAT"INCLUDES LESS THAN ONE ACRE OF DISTURBED SOIL? !

IF YES, WATER POLLUTION CONTROL PLAN (WPCP, CITY) IS REQUIRED ✓ SIGNATURE OF APPLICANT OR AGENT:

OFFICE USE ONLY DO NOT WRITE BELOW THIS LINE
Plan Check t,<..&i l L~ Plumbing
Building 7LJ.() ~· Electrical
Issuance Mechanical
Scanning SMIP
General Plan Maintenance lJ-Ct, H), SB 1473
Planning V ,,. CPTED 4diU
Other: '
APPROVED TO SUBMIT PER PLANNING: _________________ Revised 01-03-11 1731

CITY OF ALISO VIEJO
MECHANICAL. ELECTRICAL, AND PLUMBING TAKE OFF SHEET

MECHANICAL UNIT FEE SCHEDULE
lTY ITEM FEE QTY ITEM FEE
FORCED AIR GRAVITY FAU DUCTS 7 AIR HANDLING UNIT<= 5,000 CFM UP TO 100,000 BTUS AIR HANDLING UNIT> 5,000 CFM
OVER 100 000 BTUS INSTALLATION REPAIR ALTERATION
EVAPORATIVE COOLER RELOCATION OR ADD TO EA. BOILER OR

COMMERCIAL VENTILATING FAN COMPRESSOR OR ABSORPTION SYSTEM COMMERCIAL VENTILATING SYSTEM j_ <=HP OR 100,000 BTUS
EXHAUST HOOO WI FANS/ DUCTS > 5 HP OR 100,000 BTUS
RES INCINERATOR NEW/ RELOCATE •INSTALLATION/REPLACEMENT OF AIR COMM INCINERATOR NEW/ RELOCATE CONDITIONING .OF HEAT PUMPS REHEAT/COOLING COIUSTRIP HTR < = 5,000 TONS/HP
INCIDENTAL GAS PIPING > 5 TONS/HP
FLOOR WALL OR SUSPENDED HEATERS OTHER:

APPLIANCE VENTS

REPAIR/ ALT TO EA HTG APPLIANCE

REFRIGERATION UNIT, COMFORT COOLING

UNIT, ABSORPTION UNIT, OR EA COMFORT
HTG / COOLING ABSORPTION OR EVAPORATIVE COOLING SYST. INCL. REGIST. GRILLS

PLUMBING UNIT FEE SCHEDULE
:!TY .ITEM FEE QTY ITEM FEE
PER FIXTURE-SINK, TOILET, DISPOSAL I « TEMPORARY SERVICE COMMERCIAL t WTR HEATER, DISHWASHER, SOFTNER VI GAS PIPING-OUTLETS 1-5

RAINWATER SYSTEM (PER DRAIN) I EACH ADDITIONAL
ALT OR REPAIR Of PIPING OR TREAT- ' CARBON DIOXIDE SYSTEM

MENT SYSTEM SPRINKLER SYSTEM (PER METER)

BUILDING SEWER RESIDENTIAL

PRE-INVESTIGATE PRIVATE SEWER COMMERCIAL

PRIVATE SEWER STANDPIPES (ANY COMBINATION)
SEEPAGE PIT,SEPTIC TANK.SEWER CAP SPRINKLER SYSTEM ALTERATION

OR DRAINAGE FIELD YARD PIPING, UNDER GROUND SPRINKLER
VACCUUM BREAKERS BACKFLOW OR YARD PiPING, ALTERATIONS ONLY, NOT

DEVICES OR FIXTURES ON TANKNATS COMPLETE SYSTEM COMPLETE 1-SDEVICES DISTRIBUTION (PER 1,000)

EACH ADDITIONAL YARD GAS SYSTEM

INDUSTRIAL WASTE PRETREATMENT YARD WASTE SYSTEM

GAS REGULATOR (EACH) YARD COLLECTION SYSTEM
TEMPORARY SERVICE RESIDENTIAL OTHER:

ELECTRICAL UNIT FEE SCHEDULE

QTY ITEM FEE QTY ITEM FEE
SERVICE METER SWITCHBOARD >600 VOL TS EACH ADDIT.

ANNUAL ELECTRICAL PERMIT SERVICE/SWITCHBOARD<=600 VOL TS I SELF CONTAINED WIRED APPLIANCE 600 AMPS OR LESS '
BUSWAYS FOR TROLLYS AND PLUGINS 601-1000 AMPS
TYPE BUSWAYS EA 100 OR FRACTION 1001- AND GREATER
POWER APPARATUS (HP,KW,KVA) OVER 600VOLTS, ALL LAMPS
LESS THAN AND EQUAL TO 1 RELOCATION OF RESIDENTIAL SERVICE 1 UP TO AND EQUAL T 10 PRELOWERING
FROM 10 TO AND EQUAL TO 50 INSPECTION PER 10 SOFT
FROM 50 AND INCLUSIVE OF 100 GARAGE CARPORT PER 100 SOFT OVER 100 PRELOWERING INSPEC. FOR COMMERCIAL

RADIANT CEILING HEAT PER ROOM ALL OTHER INSPECTION SEE TABLE FIXTURES AND OUTLETS <::: Ir"-"' TEMPORARY POWER LIGHTING FIRST 20 IEACH) SERVICE
ADDITIONAL (EACH\ RESIDENTIAL WORK SERVICE
5 OF MULTIPLE OUTLET STRIP COMMERCIAL WORK SERVICE
MULTIPLE APPLIANCE OUTLET ASSEMB. PEDESTALS, PIGGYBACK, POLES (EACH) • POL MOUNTED VAPOR FIXTURE CONST. POLE (EACH NO POWER) ADDITNL FIXTURES ON SINGLE POLE CONST. LIGHTING <-soo LAMPS I • LAMP HOLDING-DEVICES 1 - 20 (EACH) CONST. LIGHTING >500 LAMPS I NEXT 200 (EACH) SIGNAGE (INCLUDES GAS TUBE TYPE! I
EACH ADDITIONAL ONE SIGN & TRANSFORMER i
FLASHER/ TIME CLOCK EACH ADDITIONAL SAME BUILDING :

SERVICES EA EXTRA TRANSFORMER FLASHER TIMER
PEDESTAL EA ADDIT. SIGN/fRANS SAME LOT i
SUBPANEL II i.J MOVE EACH SIGN/fRANS I
S\MTCHBOARD<600 VOLTS FIRST SECTION ALTERING CHANGING LETTERING S\MTCHBOARD <600 VOL TS EACH ADDIT. CONVERTING SIGN OR DECORATVE TUBING I ·s\MTCHBOARD >600 VOLTS FIRST SECTION OTHER: I • • 1732

CONTROL SHEET

CHECK LIST FOR APPROVALS REQUIRED FOR PLAN REVIEW
The following departments and agencies must approve the project in order to obtain a building permit.

PLAN REVIEW NO. Co o:>l ~ ADDRESS: __ _,_· J ,._,_S----'--~'-'--1-""CV!......__0=<2±"----· L---- Reviewing Agency Waived APP. ov

1. Planning Division

2. Crime Prevention Through Env. Design

3. Letter of Authorization from Landord

4. Letter of intent (commercial Tl's)

5. Non-Structural Review

6. Structural Review

7. City Engineering Review

8. City Landscaping Review

9. Grading Release
• 10.Residential Fire Questionnaire

11.Comm. Alt. Questionnaire

12. Fire Department Review

13. AQMD Permit

14. Environmental Health

15. Water District Will Serve Letter

16. Water Quality/ NPDES

17. Construction Waste & Demolition
_18. Home Owners Association (SUB & AVCA)

19. Other __________ _

FEES AND MISCELLANEOUS
1 Transportation Corridor Fees

2. School Fees

3. Planning Plan Check Fees

4. Development Impact Fees (Planning)

5. Other -----------

NOTIFICATIONS
Notified
Notified
Arch./Contr./Other
Arch./Contr./Other
~
Ready to lss.
' ~ t
Notified Arch./Contr./Other s
Notified Arch./Contr./Other Ready to lss
Notified Arch./Contr./Other Ready to lss
Notified Arch./Cohtr./Other Ready to lss
Contact Person: M&-¥----- Cof:! ,S:1\FE
Phone Number:G:-££7+4:zv -/0 3s;=
Correct
Correct
Correct
Correct
---% f /ath OJhJd i3d
~
INI~
26 ~';{fr7)(1
~
Controlsheet.doc / revised 8/20/08
1733
• •
Capistrano Unified School District
COMMERCIAL/DmUSTIUAL PROJEC
CER'l'IFICATE OF COMPLIANCE
Developer Fee Program
DATE SUBMITTED: 9/612011
RECEIPT NO: NIA
DATEPAID: 9/612011
CHECK NO: NIA
SCHOOL DIST. NO: 6243
GRID CODE:

Project Name: AICI, LLC
------------------------------ Address : 15 ARGONAUT
(Street)
Project Applicant: SAME

ALISO VIEJO, CA
(Community, ST)
92656
(Zip)
---------------------------- Phone : 310/725-0006
Applicant Address:
(Street) (Community, ST) ( ZIP)
Assessor
Project Tract Map No.: Parcel No. (s): 623-093-10/623-093·1 ------- Lot No(s): ------------------------------ Co mm en ts: NOT SUBJECT TO DEVELOPER FEES. THIS PROJECT WILL PAY MELLO-ROOS TAXES. (Do not write below this line -- for School District staff use) STA'l'tJS OF PROJECT
Project is charged fees under Government Code Section 65995 Applicant is hereby noticed that any party filing a protest regarding the imposition of fees pursuant to Government Code Section 53080 must do so within 90 days from the payment of the fee.

Enclosed and Covered Area: 4407 x Rate: $0.00 = FEE: $0.00 ----- ------ ------- Number of Buildings: 1 ti
Schoo1 Dis<ricc Si'""'c=e, ~__J5$\"""-
Title: DeputySuperintendent ~
. Date: 9/6/2011
-------
Preview/Reprint
1734
Permit Tech • •
From:

Sent:

To:

Cc:

Subject:

Bass, Kevin [[email protected]]
Tuesday, August 30, 2011 1 :36 PM
Permit Tech
Mark Grisafe; Ted Halsey
RE: 15 Argonaut
cf ,uJ~
0 •• (J1fk uJ,j'IJ:.,A, ~ r, ~v::f-'. ~ 7 oq~"~ ~,,;-1' ?fa Thanks Joanna for reminding me about the OCFA plan review process. I'm a b\t rusty since I'm in another fire prevention section and not involved with the planning side of these projects. Please accept this email as OCFA's waiver to allow for the issuance of building permits connected with this project. If you need any additional information or direction, feel free to call/email me.

Kevin Bass
Assistant Fire Marshal
OCFA Fire Prevention
(949) 347-2242
-----Original Message-----
From: Permit Tech [mailto:[email protected]] Sent: Tuesday, August 30, 2011 12:51 PM
To: Bass, Kevin
Cc: Mark Grisafe; Ted Halsey
Subject: RE: 15 Argonaut
Hi Kevin,
Our standard procedure for plan check submittals is to have the customer fill out a variety of screening forms to determine what agency will need to review and approve the project.

In this case the customer answered yes to OCFA's screening from question No.l 11 Construction of a new bldg, new story, or increase the footprint .... 11 , which triggered the city to require OCFA approval. When scenarios like this happen where the answer is a yes but OCFA determines a review is not required, that's when we require something in writing waiving the review. Does that make sense?
Having said that, I can accept this email as OCFA's acknowledgment of the project and determination that an 11 architectural 11 review is not required.

Feel free to contact me if you have any questions. I'm here from 7:30 am to 12pm Monday - Friday, closed every other Friday.

Thank you,
Joanna
-----Original Message-----
From: Bass, Kevin [mailto:[email protected]]
Sent: Tuesday, August 30, 2011 12:09 PM
To: Permit Tech
Cc: 'Mark Grisafe 1
Subject: FW: 15 Argonaut
Hi Joanna,
If you look below to the email string, you'll see the OCFA's plan reviewers' comments on the subjedt of OCFA approval for issuance of a building permit for TI's to a B occupancy.

It looks like the plan submittal criteria form at the city would be sufficient for OCFA approval if all answers are 11 00 11 • If this won't do, can you give me a call at my office after lune~? I should be back in the office about 1:30 p.m. Thanks, Kevin I
1735
Kevin Bass
Assistant Fire Marshal
OCFA Fire Prevention
(949) 347-2242
-----Original Message-----
From: Pivaroff, Lynne
•
Sent: Tuesday, August 30, 2011 11:40 AM
To: Elmer, Eric; Bass, Kevin
Cc: Colmenares, Ruben
Subject: RE: 15 Argonaut
Thanks Eric.
-----Original Message-----
From: Elmer, Eric
Sent: Tuesday, August 30, 2011 11:29 AM
To: Bass, Kevin
Cc: Pivaroff, Lynne; Colmenares, Ruben
Subject: RE: 15 Argonaut
•
Lynne's right.
applicant fill
questions, the
If the city needs something in writing though, I would recommend that the out a plan submittal criteria form. If they answer no to all the city can accept that as a waiver for OCFA review.

ERIC ELMER, FIRE PREVENTION ANALYST Orange County Fire Authority! Planning & Development Services [email protected] 1 P. 714.573.6118 1 F. 714.368.8843 Mailing: P.O. Box 57115 I Irvine, CA 92602
Smoke Alarms & Fire Sprinklers Save Lives. Visit ocfa.org to learn more about reducing your fire risk.
-----Original Message-----
From: Pivaroff, Lynne
Sent: Tuesday, August 30, 2011 11:20 AM
To: Bass, Kevin; Colmenares, Ruben
Cc: Elmer, Eric
Subject: RE: 15 Argonaut
Hi Kevin,
The mezzanine is a Building call. We wouldn't h6ld up building permits. All we care about is the sprinkler T.I. plans to be submitted before they cover up the sprinkler pipe. -----Original Message-----
From: Bass, Kevin
Sent: Tuesday, August 30, 2011 11:05 AM
To: Colmenares, Ruben; Pivaroff, Lynne
Subject: FW: 15 Argonaut
Ruben and Lynne,
The project is a TI for a B occupancy with no permits or hazardous materials over threshold amounts. A sprinkler plan will be required since they are constructing a mezzanine, but that should be it. What I'm confused about is the waiver for the city to allow this project to go forward. Have we (OCFA) done this in the past with a city building department to allow issuance of building permits? Any help would be appreciated.

Thanks, Kevin
-----Original Message-----
From: Mark Grisafe [mailto:[email protected]]
Sent: Tuesday, August 30, 2011 10:43 AM
To: Bass, Kevin
Cc: Permit Tech
Subject: FW: 15 Argonaut
2 1736
•
Hi Kevin- • •
Can you send Joanna at the City of Aliso Viejo an e-mail per her comment below? Thanks!
Mark
------ Forwarded Message
From: Permit Tech <[email protected]>
Date: Tue, 30 Aug 2011 08:43:26 -0700
To: Mark Grisafe <[email protected]>
Cc: Rob Maingot <[email protected]>, Brien Bohler <brien@r~ndccontracting.com>, Ted Halsey <[email protected]>
Conversation: 15 Argonaut
Subject: RE: 15 Argonaut
Hi Mark,
I talked to Ted this morning regarding your resubmital and he had no issues with the changes you made to the plans; however, I do have to send the structural out for recheck.

It should be no more than 5 business days for review.

Regarding OCFA, you are correct in the fact that fire sprinklers are a separate submittal/permit; therefore it won't hold up your permit.

However, what we need in order to release the permit is an approval or waiver for the mezzanine and TI work. An email from Kevin waiving the review would be fine.

If you have any questions feel free to contact me.

Thank you,
Joanna
-----Original Message-----
From: Mark Grisafe [mailto:[email protected]]
Sent: Monday, August 29, 2011 1:59 PM
To: Permit Tech
Cc: Rob Maingot; Brien Bohler
Subject: 15 Argonaut
Hi JoannaOnce Ted has had an opportunity to review and approve the drawings I dropped off today please let me know.

You mentioned that one outstanding item was the OFCA approval. I spoke to Kevin at OFCA.

He wanted to make sure that the sprinklers were a deferred submittal, which we have indicated they are. He said in that case, he would defer to Ted as to issuance of a Permit and so OFCA review shouldn't hold up permit issuance.

Regards,
Mark Grisafe, AIA
5618 E. Conant Street
Long Beach CA 90808
P:562-420-1035
F:562-683-0440
------ End of Forwarded Message
3 1737
• • Project Number:

Plan Check No.: (ofl 3 / <t

CRIME PREVENTION THROUGH

ENVIRONMENT AL DESIGN
(CPTED)
Submittal Date: 7 / 2,u} J.-D l I
Receipt No.: /2 q J Z

CONDUCTED BY
Inspection Required:-1-Yc..,e.:=""'0=:::Sce_ __ _

MARGO BEAUCHAMP
CRIME PREVENTION SPECIALIST PC Hours: J H;f,._ /'44 ~
(949) 425-2563 phone (949) 425-3899 facsimile
[email protected]
R li"Y 1 0-.1 ,,. ll'1A-,7JA-Re
I rv.S 't"e:-CT;D,-/
W ~------ Statua Date ,
/JQY\JD 1T1 orJTD i,VPO 1
1 _
1 __ 1_",~:~w _J~rrections .

Jrv !>/7c'vT1,tJN
,,;
(JP 2nd Review r
' Approved/Corrections ~
1\J) i'.,tlT "j E1'Yl8Z.t, OvG::) 'r- . •
LI l, HT l'II (p , . , _ , I 3" Review ' Approved/Corrections ' ) '11 -c..~01:S--v,6S1Dr-' • ..._ ___ ., Orv '2 / 1; /?on r11TH M, c;it I s,4Fi

GENERAL INFORMATION
Project Name: ,AVV' 13, >2'.'._j -0-Dv r,1 G l,
Proposal: New Addition Tenant Improvement ✓
Address: J5 JCif<...t, o J\f-Au-.T
Contact:Mfl)Zx, 4 fl' sA P£'

TYPE OF STRUCTURE
Commercial Building
D Open Space/Recreation

SITE INFORMATION
D
□
□
□
□
Lot Size
Dimensions
Lot Coverage
Landscape Coverage
Tenant Space Size
12/7/2010
Phone:(5'02) i.-J2,o -)tJ3S Fax/Email: _______ _
Parking Structure Residential Building(s)
Other __________ _
___ (width) ___ (depth)
____ %
----%
0 Building Height
1738
August 8, 2011
City of Aliso Viejo
12 Journey, Suite I 00
Aliso Viejo, CA 92656
Attention:

Regarding:

Joanna Stevens
Ambry Genetics
15 Argonaut
(Phase 2)
Dear Ms. Stevens:

Moulton Niguel Water
WATER QUALITY AND SERVICE ARE #1
This letter serves as notice that the Moulton Niguel Water District (MNWD) will serve water and sanitary sewer to the above subject development. This project is completely within MNWD boundaries. MNWD staff has determined that there is no need for grease intercepting facilities.

This indication of MNWD's ability to serve the above-referenced project is conditioned upon the payment of all applicable fees.

The availability of water services is subject to the suppliers of water to MNWD continuing to honor their contractual obligation relative to the amount of water to be supplied. MNWD can make no representations as to the future intention of said suppliers in this regard.

Sincerely,
Mark H. Mountford, P.E.

Associate Engineer
MHM:jc
ICT
cc: Paul Schmidtbauer, SOCW A
G:I WILLSER V\wilhcrvcAmhr)'Gcnclics• Pha~c 2. doc
a public agency at:
27500 La Paz Road, Laguna Niguel, CA 92677-3489
Mailing Address: P.O. Box 30203, Laguna Niguel, CA 92607-0203 949/425-3532 FAX 949/643-2489 1739
mgRISAFE
TO:

FROM:

DATE:

REGARDING:

VIA:

COPY:

Dear Jennifer
•

ARCHITECT

CITY OF ALISO VIEJO
12 Journey, Suite 100
Phone: 949-425-2526
Attn: Jennifer Lowe, Assoc. Planner
Mark Grisafe
July 26, 2011
15 Argonaut - CUP Description Letter
E-Mail
File
•

TRANSMITTAL
Ambry Genetics is a testing lab with offices, currently residing in the City of Aliso Viejo.

As their operations have expanded, they require additional space. They have agreed to relocate to 15 Argonaut - also in the City of Aliso Viejo.

This new, larger facility, previously occupied by a memory chip company, had a similar business model which allows Arnbry a cost effective and relatively seamless expansion. It can also better accommodate their current and anticipated needs and it allows Ambry the chance to remain in the City of Aliso Viejo.

Re,·iewing City guidelines, we understand that Ambry is considered generally a dry lab with a minimal wet lab component.

Below is a description of the lab spaces of this project:
105 - R&D 2,954 s.f. (dry lab) - Use of small tubes and plates with micro-liter sized reactions. Various sequencing reactions and sample preps for next generation sequencing.
107 A,B,C- Test & Test Storage 1,092 s.f. & 491 s.f. (Future R&D dry lab)-for future expansion, no work going on in any of the 3 areas.
112-Sequence (dry lab) -1,053 s.f.- Samples are loaded onto various sequencing platforms using either sequencing plates or flow-cells (microscope slide sized chips).

Very little to no bench work required. This room will house the sequencing equipment that will run either overnight or over several days.
113- PCR (dry lab) - 434 s.f. This room will house all of our PCR machines. Samples will be placed in these machines in either plates or tubes and be left to cycle through various temperatures for a number of cycles. Again this is very little to no bench work required.
114A- Dcode (dry lab) - 451 s.f. Being left empty at the moment for future growth. 5618 E. CONANT STREET LONG BEACH, CA 90808 562.420. 1 035 1740

TRANSMITTAL
July 26, 2011
Page2
• •
114B - QA (wet lab) - 449 s.f. This room is what I would consider "wet" because this is where we do all of our electrophoresis which uses buffered TAE solution mixed in with de-ionized water. Techs will load acrylamide gels with patient sample and let run for several hours as they gradually heat up and while constant voltage is being applied. 114C- Solutions (wet lab) - 329 s.f. - This is also what I would consider "wet" because this is where we use all of our chemicals in larger sized reactions. Usually in liters or in tens of liters. This is our reagent prep area.

The minimal amount of wet lab and the kinds and quantities of chemicals at this facility pose a minimal threat to public safety, yet Ambry is regulated by the following agencies:

The Federal agencies are CLIA = Clinical Laboratory Improvement Amendments and CAP = College of American Pathologists.

Federal License #
CUA 05D0981414
CAP LAP# 7154701
In addition, they are liscened in the following States:

State License #
California CLF11694
Florida 800016789
Rhode Island LCDO00439
Pennsylvania027832
Maryland 1052
New York PFI: 8160
Ambry Genetics also maintains a standard office emergency preparedness protocol.

Thank You,
Mark A. Grisafe, AIA
1741
,. ~·--T·,.:,...: ··.:,j,,..nO,,~~-(fA'"' 'l• - ~.;~ ·i-<,..,..·1r• ... .._....,•~-.:;;-r"" .. ~.·~.,.'4~--11 '¼-~·,.__,..-...-. ..,.,,.,l.(--.-'-~~..,,;!t~~--- • . •. ~

ORAN COUNTY FIRE AUTHOR

PLANNING AND DEVELOPMENT

SERVICE REQUEST

SR NUMBER
179263
Plca~e review the Submittal Criteria Form and complete the Permit Screening Form before completing this Service Requesl (SR). Be prepared to provide this SR number when inquiring about your plans. Plan status@ www.ocfa.org, Inspection scheduling: (714) 573-6150, General questions (714) 573-6100, Technical Help (714) 573-6108. Plan submittal information may be downloaded from our website at www.ocfa.org I. Submitted by (Company name) /6. €€-J§tsf:e f-{7C £ f f 7F'Gt Address 5bl 5 .E:- CtJJf:,4ANt sr.

City LOJJb 1?,gr:-;-/4 c:;a.._.

PhoneSb2°1i3'r/cJs;f: Ext. __
Zip code._9_._t_ft_J----'9=-------
Bill to (ifdillcrent) _S:,.,._.,_AM-'-'--'----'-F.____________________ Phone ________ Ext. ___ _ Address
City ___________________________ Zip Code __________ _
Name of primary contact _JM~~f:'.~ffl)~t. ~~erE:l:::· ________ Ph~~Sl.@-,tJs r Ext. --- E-mail address

2. PrOject Name (be specific)
.. ..

Project Address ________ , _,
Project City AU so Vle.kJ Zip code----------
Provide one or more of the following: Tract/Lot# ______ Tentative Tract/Lot# ______ Parcel Map# z8-- 2-] P I<,. t TraL·t, tentative tract or parcel map number is required/or approval

3. I hereby authorize the following project plan review services. I am aware that additional services may he required to complete this project and agree to pay all fees. I also acknowledge receipt of a copy hereof. . ri J " /4 l l :\1 ~ Signecl: c"),. ,=,, r, • , I• Date: • c.:'-!/f/ • ,. ~ ~ ~~ ~

JURISDICTIONAL USE ONLY
PLAN SUBMITTED AT: 0 (__f:::::A_
coriE QTY FEE
CITY PLANNING DEPARTMENT 0

CITY BUILDING DEPARTMENT D

COMMENTS
; 'JA1 1'. . ~ L/ _ i,, J -ri I?-, " - City Reference #:
-'-'---'"'-':;_-f- ,-+-.l---+-,.,..'-4----1
Revision to SR #:

Re-stamp of SR #:
------+-----,f------1
OCFA SUBTOTAL:

CITY FEES: PAYMENT
DATE INITIALS RECEIPl/CHECK#/),C# I / ,
TOTAL DUE:

ADD'l AMT PAID: I I
ADD 'l AMT PAID:

ADD'l AMT PAID:

OCFA,USE ONLY

OCFA SJ)RVICES PROVIDED
CODF. QTY
I
TOTAL DUE OCFA:

REFUND TO
CUSTOMER:

BALANCE DUE OCFA:

ADD'l CITY FEES DUE:
"'
FEE
134-
)'1.n')..

FORM DISTRIBUTION: WHITE: OCFA YELLOW: Refund/Payment-Customer Copy PINK: Bmldmg Department GREEN: Customer Copy (R_e,- I0/111011 km)
1742
- City of Aliso Viejo -
Building and Safety Department
12 Journey
Aliso Viejo, CA 92656

PLAN CHECK
Submittal Date: ________ _ Plan Check# ~I _68_3_1_8 ~
Plan Check Fee: $1,566 48
Contact:

Applicant MARK GRISAEE
Address -~5=6~16~- E CONANT SST
Zip 90808 City I ONG BEACH
Lot Apn
Project Description
Tract
--------
Job Address:~-------
Job Street: ARGONAI II
Telephone: (562) 420-1035
PLAN REVIEW TENANT IMPROVEMENT PHASE 2 FOR AMBRY GENETICS. BUILD NEW 2ND FL MEZZANINE 4407 SF WITH NEW OFFICES AND RESTROOMS BELOW. NEW HVAC SYSTEM AT ROOFTOP.

TENANT: AMBRY GENETICS
VALUATION·$355 204 00
Calculated by
Receipt# 12918
1743
Job Information
City • Aliso Viejo
Building and Safety Division
12 Journey, Suite 100
Aliso Viejo, CA 92656
P: (949) 425-2540
F: (949) 425-3899
Street Address: --~1~5 __ 0
A~R~G~O=N~A~U~T _________ _
ApUSte: ____ _ Lot: APN: _______ _
Tract: Cross St:

Applicant: HUNT'S FIRE PROTECTION
Street Address: 929 CARHART ST
City: FULLERTON Zio: __ ~92=8~3~3 __
APPLICAT. FOR BUILDING PERMIT

AND CERTIFICATE OF OCCUPANCY
Inspection request line 949-425-2545
Permit Number
68590
Plan Review No.:
68590
,------------·-------------<
The followinq work is authorized by this permit
D Structural ~ Plumbina D Electrical D Mechanical
Type of Project
D New D Addition D Occupancy Permit
1:8:1 Alteration D Demolition
D Repair D Tenant Improvement
State:_S,_6__ Phone:_(7~) 915-2074 Cell: 1-----------------------1 Owner: AICI, LLC
Street Address: -~2~32~1~--~R~O~S=E=C~R~A~N~S~A~V~E~------

FIRE SPRINKLERS
Sa.Ft.

City: EL SEGUNDO Zio: __ .=.90"'2'-'4-=-5 __
State:~ Phone _(310) 725-0006 Cell: 1---------
Ena/Arch: ____________________ _ , ________ _ Phone: License#:

LICENSED CONTRACTORS DECLARATION
I HEREBY CLAIM, UNDER PENAL TY OF PERJURY, THE FOLLOWING i===========c....:========-====J STATEMENT: THAT I AM LICENSED UNDER PROVISIONS OF CHAPTER 9 Zoning Approved By:

COMMENCING WITH SECTION 7000 OF DIVISION 3 OF THE BUSINESS j...::'.:'.'..'.:'..':~c'..':'.'..::.::.:::'.'...::'..~-==============~ AND PROFESSIONS CODE, AND AT THIS TIME MY CONTRACTORS Remarks/Special Conditions/Project Description LICENSE IS CURRENT, ACTIVE AND IN FULL FORCE. PERMIT TO ADD AND RELOCATE F ~RINKLER Contractor: HUNT'S FIRE PROTECTION HEADS 126 TOTAL FOR Tl PER 68318.

Street Address: 929 CARHART ST
City: FULLERTON Zio: __ 9~2~8~3~3 __
State:~ Phone:_(714)915-2074 Cell: _____ _
UC.#: 553703 Exo. Date: 1/31/2013 CLASS: C16

CONTRACTOR TO PROVIDE ACCESS TO ROOF & ATTIC

WORKERS' COMPENSATION DECLARATION

I HEREBY CLAIM, UNDER PENAL TY OF PERJURY, ONE OF THE
FOLLOWING STATEMENT:
□ I HAVE AND WILL MAINTAIN A CERTIFICATE OF CONSENT TO SELF

INSURE FOR WORKERS COMPENSATION, AS PROVIDED FOR BY
SECTION 3700 OF THE LABOR CODE FOR THE PERFORMANCE OF THE WORK FOR WHICH THIS PERMIT IS ISSUED.

I HAVE AND WILL MAINTAIN COMPENSATION INSURANCE AS
REQUIRED BY SECTION 3700 OF THE LABOR CODE FOR THE
PERFORMANCE OF THE WORK WHICH THIS PERMIT IS ISSUED. t--T-h-is_p_e_r_m_i_t-sh_a_l_l _ex_p_i-,e-'-if-t-he---b-u-il-d-in_g_o_r_w_or_k_:,a_u_t_h_~_ri-ie_d ___ b_y__, Workers' Comoensation Carrier such permit is suspende? or abandoned for a peri<;>d of 180

STATE FUND
Policy#
238-0005560
Exp. Date
1/1/2012 , _ · ' • day§. .! " ; .:, ,.

CERTIFICATE OF WORKERS COMPENSATION EXEMPTION All work shall conform to the 2010 C.B.C., 2010 C.M.C., /THIS sEcnoN NEED NOTBE coMPLETED IF woRK 1s $soo oR LESSJ 2010 C.P.C. and the 201 o C.E.C. 9 CERTIFY UNDER PENAL TY OF PERJURY THAT IN THE PERFORMANCE ,-----------------------, OF THE WORK FOR WHICH THIS PERMIT IS ISSUED, THAT I SHALL NOT Grouo/Division/Tvoe Hiah Fire Hazard EMPLOY ANY PERSON IN A MANNER so AS TO BECOME SUBJECT TO □ Yes □ No THE WORKERS COMPENSATION LAWS OF CALIFORNIA, AND AGREE 1-=============----__:=----==----J THAT IF I SHOULD BECOME SUBJECT TO THE WORKERS Valuation Fire Sorinklers COMPENSATION PROVISIONS OF SECTION 3700 OF THE LABOR CODE O Yes O No THAT I SHAI I F()RWlTH r.nMPI V WITH THOSF PROVISlnNS i-=============-----_::=-.:..::.:..........::~::....---1 Wa~ing: Failure to se~r~ workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and c1v1I fines up to one hundred thousand dollars ($100,000), in addition to the cost of compensation. damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees

OWNER BUILDER DECLARATION

I AM EXEMPT FROM THE CONTRACTORS LICENSE LAW FOR THE
FOLLOWING REASON:
□ I,.AS OWNER OF THE PROPERTY, OR MY EMPLOYEES WITH WAGES

AS THEIR SOLE COMPENSATION, WILL DO THE WORK, AND THE

STRUCTURE IS NOT INTENDED FOR, OR OFFERED FOR SALE (SECTION 7044, OF THE BUSINESS AND PROFESSIONS CODE)
□ I, AS OWNER OF THE PROPERTY AM EXCLUSIVELY CONTRACTING

WITH LICENSED CONTRACTORS TO COMPLETE THE PERMITTED
PROJECT UNDER THE PROVISIONS OF SECTION 7044, OF THE BUSINESS & PROFESSIONS CODE.

I certify that I have read this application and state that the above information is correct, and that I am the owner or the duly authorized agent of the owner. I agree to comply with all city and state laws relating to building construction. I hereby authorize representatives of the City of Aliso Viejo to enter upon the ohno,o m~ntI?r
Signature of Applicant or Agent 13 rvC<L C.... kf:u Nd- /o~/2-1/ Print Applicant's/ Agent's Name Date
Structural
Electrical
Mechanical
Plumbina __ $_3J.5J __
Plan check
Issuance __ $17.33
Microfilm ___ $_5.cO_O __
Water Quality
Total Citv Fee Due __ $48.86
Seismic Fee
SB 1473
Total Amount Paid __ $_5_38_6 __
Issuance ApprovedJoanna Stevens
Date Issued
__ \/\,'ed._OcU2 . .20JJ __ _
Receipt Number
13215
Permit Number: _68590_ 1744

CONSTRUCTION AND PLANNING POOL AND SPA
APPROVALS Permit# ___ _ APPROVALS Permit#, _____ _
Date lnsp. Date lnsp.

1. Temporary Electrical Service or Pole

2. Soil Pipe--Underground 1. Pool & Equipment Location

3. Water Pipe--Underground I Underslab 2. Steel Reinforcement

4. Water Service 3. Electrical Bonding

5. Property Sewer/ House Connection 4. Rough Plumbing & Pressure Test

6. Electrical Conduit--Underground 5. APPROVAL TO COVER--GUNITE

7. Gas Line Underground & Test 6. Electrical Conduit--Underground

8. Footings & Steel UterO 7. Gas Pipe, 0 Underground, Test

9. Foundation--Slab on Grade 8. Backwash Lines, P-Trap, O Und.

10. Retaining Wall Fooling 9. Backwash & Receptor--Final

11. Pre--Grout O Drainage O 10. Fencing and Access Approval

12. Gas Pipe-Underground & Test 11. APPROVED FOR PLASTERING

13. Rough PlumbgJTop Out/Shower Pan 12. Heater & Vent--Final

14. Roof Drains & Overflows 13. Plumbing System--Final

15. Rough Electrical--Conduit 14. Electrical--Flnal

16. Rough Electrical Wiring 15. Solar System--Final

17. Rough Heatin_g & Air Conditioning 16. POOL/ SPA SYSTEM FINAL

18. Rough Factory Fireplace

19. Ducts, Ventilating
FIRE DEPT. REQUIREMENT
APPROVALS Permit# ____ _ Date lnsp.

20. Fire Dampers 1. UNDERGROUND HYDRO

21. Floor Shealhing 2. PRODUCT PIPING OGAS O OIL

22. Roof Sheathing 3. UNDERGROUND FLUSH

23. Roof Framing 4. UNO. STRG. TANK OGAS O OIL

24. Approved to Cover Exterior 5. OVERHEAD HYDRO

25. Rough Frame and Flashing 6. DRY CHEMICAL

26. "T" Bar Ceillng/Elect./Mechanical 7. DRY STANDPIPE

27. Insulation 8. FIXED SYSTEM FINAL

28. Lathing O Interior O Exterior 9. FIRE PREVENTION FINAL

29. Drywall Nailing NOTES:

30. Electric Power Meter Final I, AS THE CONTRACTOR, HEREBY AFFIRM UNDER PENALTY 1--3-1.-Fi-n-al_E_le_c_tr-ic----------f----+----I OF PERJURY THAT I.AMA CERTIFIED HOME IMeROVEMENT 1----------'-·------1-----1---~ CONTRACTOR UNDER THE PROVISIONS OF SECTIONS 7150

32. Final Sign AND 7151 OF THE STAlE OF CALIFORNIA BUSINESS AND 1-----------------+----+----1 PROFESSIONS CODE.

33. Hood or Canopy Final

34. Final Factory Fireplace DAlE: _____ CONTRACTOR: ________ _

35. Final Mechanical

36. Final Plumbing

37. Water Service FinaVRelease

38. Gas Final. Including Connectors

39. Solar Domestic--Final

40. Re-roof Final

41. Retaining Wall Final

42. Handicap Regulations

43. Landscape Final

44. Zoining--Final

45. Engineering--Final

46. Heallh--Final
4 7. Fin.al :3tructure & Building

48. Gas Release

49. El~ctricHel~ase
.._•_ .. _1n_s_p_ec_to_r_'s_,1_;1-iti_a1_s_&_N_a_m_e_.i....I ____ .1... ______ .J.. ______ --4 1745 .ORAN COUNTY FIRE AUTHORITY SR NUMBER

PLANNING AND DEVELOPMENT
SERVICE REQUEST 179631
Please review the Submittal Criteria Form and complete the Permit Screening Form before completing this Service Request (SR). Be prepared to provide this SR number when inquiring about your plail_s. Plan status @ www.ocfa.org, Inspection scheduling: (714) 573-6150, General questions (714) 573-6100, Technical Help (714) 573-6108. Plan'~~bmittal informati?_!!~may be downloaded from our website at www.ocfa.org 11

1. Submitted by (Company name) ~ / /.,,, // ? /v-~ , / f-,;A. c.// d A I Phon{1IY,I <jl r> 7 ° ix! __ _ Address o/Z 1 • Ce. , ti c. ,,-+ s:* ', : .

City 'Fu // -,,y-·,/-,. r-) \ \ 0.1/1 Zip code /-Z ,,.P 7 S'. ............ Biil ·to (;}1m~;;f-,~~)I;..... ~ \ •• ,.... Phone • --Ext. ___ _ Address
' " City _____ ~~··~·-------------,,,---------Z1p'E:ode ___________ _ _______ ._· _-_··--~-~ -----~ / ---------------~-~==~--- Name of primary contaci \,-a/lJ ( ,c ,,0.-,MJfr· Phon(71,; ) ~If~ ?O 7 lr Ext. __ _ E-mail address' (,?,.,
~ 1Y.,. 0 ,!/,,vi. ..ere Co rZ,f r ~ ~ ,
Provide one or more of the following: Tract/Lot# ______ Tentative Tract/Lot # ______ -Parcel Map# _______ _ I Tract, tentative tract or parcel map number i:1· required for approval

3. I hereby authorize the following project plan review services. all fees. I also acknowledge receipt of a copy hereof.

I am aware that additional services may be required to complete this project and agree to pay ~ Signed: p___.__ ( /LJ;;iLJURISDICTIONAL USE ONLY
PLAN SUBMITTED AT: :fttv

CODE QTY FEE
I ln01
OCFA SUBTOTAL: I'd-VI
CITY FEES:

TOTAL DUE: VJYJ\
ADD'LAMTPAID:

ADD'LAMTPAID:

ADD'LAMTPAID:

CITY PLANNING DEPARTMENT □
CITY BUILDING DEPARTMENT □

COMMENTS
City Reference #:

Revision to SR #:

Re-stamp of SR #:

P~YMENT
DA]E INITIALS RECEIPT/CHECK#/CC#
I
11 l7ill L . '-...:.. .

OCFAUSE ONLY

OCFA SERVICES PROVIDED

CODE QTY FEE
TOTAL DUE OCFA:

REFUND TO
CUS1VMHK:

BALANCE DUE OCFA:

ADD'L CITY FEES DUE:
rA
FORM DISTRIBUTION: WHITE:.OCFA YELLOW: Refund/Payment-Customer Copy PINK: Bmldmg Department /Re,· IO/MIOK km\
J ~
GREEN: Customer ,, Copy!=,J ... ~ 1746
City o~liso Viejo
Building and Safety Division
12 Journey, Suite 100
Aliso Viejo, CA 92656
P: (949) 425-2540
F: (949) 425-3899
APPLICATIC9_FOR BUILDING PERMIT
AND CERTii!fCATE OF OCCUPANCY
Inspection request line 949-425-2545
Job Information
Street Address: __ .:.;15::_ __ ,A'--'R'--'G=O-"N"-A"'U'--'T ________ _ Permit Number
68806
Plan Review No.:
68806 1-------------"------------I
ApUSte: ____ _ Lot: APN: ______ _ The followinq work is authorized by this permit Tract: Cross St: D Structural D Plumbina D Electrical O Mechanical Type of Project Applicant: AMBRY GENETICS/ JAMES L DUNLOP Street Address: 622 BLUE BIRD CANYON . D New D Addition D Occupancy Permit D Alteration D Demolition
City: LAGUNA BEACH Zio: ___ 9'-'2'-'6~5'--'1 __ D Repair D Tenant Improvement State:~ Phone: _(949) 545-8907 Cell:

Owner: AICI, LLC fuLEl
TEMP C OF 0
ful£t
Street Address: _ _,2,.,3::2.,_1 __ 0R.,_O=S=E.:C-'-R"-A"-N'-'S"-'-'A-'-V=E~------ City: EL SEGUNDO Zio: __ _,,9"'02"-4'-'5'-- 1
--------
State:~ Phone:_(310) 725-0006 Cell:

Eno/Arch: ____________________ _ 1---------
Phone: License#:

LICENSED CONTRACTORS DECLARATION
I HEREBY CLAIM, UNDER PENAL TY OF PERJURY, THE FOLLOWING l============---=========-====i STATEMENT: THAT I AM LICENSED UNDER PROVISIONS OF CHAPTER 9 Zoning Approved By:

COMMENCING WITH SECTION 7000 OF DIVISION 3 OF THE BUSINESS I-='.:'.'..'.~!.,'.:'.!:'..':'.::,::::_::.::~~-===============-i AND PROFESSIONS CODE, AND AT THIS TIME MY CONTRACTORS Remarks/Special Conditions/Project Description LICENSE IS CURRENT, ACTIVE AND IN FULL FORCE. TEMPORARY CERTIFICATE OF OCCUPANCY Contractor: __________________ APPLICATION FOR 30 DAYS,~-X-ES 1/22/12.

Street Address:____________________ _
City:______________ Zio: _____ _
State:__ Phone:_______ Cell: ______ _
LIC. # CONTRACTOR T:x:~~::E ACCESS TO ROO~~:;IC ,-[_,.,, ~ /4• ½c WORKERS' COMPENSATION DECLARATION ~ ,1( {J,

I HEREBY CLAIM, UNDER PENAL TY OF PERJURY, ONE OF THE
FOLLOWING STATEMENT:
□ I HAVE AND WILL MAINTAIN A CERTIFICATE OF CONSENT TO SELF

INSURE FOR WORKERS COMPENSATION, AS PROVIDED FOR BY
SECTION 3700 OF THE LABOR CODE FOR THE PERFORMANCE OF THE WORK FOR WHICH THIS PERMIT IS ISSUED.
□ I HAVE AND WILL MAINTAIN COMPENSATION INSURANCE AS
REQUIRED BY SECTION 3700 OF THE LABOR CODE FOR THE
PERFORMANCE OF THE WORK WHICH THIS PERMIT IS ISSUED. 1--T-hi_s_p_e_r_m-it_s_h_a_l_l e_x_p_i-re-if-th_e_b_u_ild_i_n_g_o_r_w_o_r.,_k~'-a_u_t_h_o_riz_e_d-by-1 Workers' Comoensation Carrier such permit is suspended or <1,bandoned for.a,perjod of 180 days. •
Policy# Exp. Date
CERTIFICATE OF WORKERS COMPENSATION EXEMPTION All work shall conform to the 2010 C.B.C., 2010 C.M.C., (THIS SECTION NEED NOTBE COMPLETED IF WORK IS $500 OR LESS) 2010 C.P .c. and the 2010 C.E.C. 9 CERTIFY UNDER PENALTY OF PERJURY THAT IN THE PERFORMANCE l------------------------1 OF THE WORK FOR WHICH THIS PERMIT IS ISSUED, THAT I SHALL NOT Grouo/Division/Tvoe Hiah Fire Hazard EMPLOY ANY PERSON IN A MANNER so AS TO BECOME SUBJECT TO □ Yes □ No THE WORKERS COMPENSATION LAWS OF CALIFORNIA, AND AGREE 1-=============----_:=-__ __::_ _ _j THAT IF I SHOULD BECOME SUBJECT TO THE WORKERS Valuation Fire Sorinklers COMPENSATION PROVISIONS OF SECTION 3700 OF THE LABOR CODE O Yes O No THAT 1 ~HAI I i=rn:;!WITH r.nMPI v WITH THn~F PRnVl~lnN~ 1-=============----_:=-~=---=-:...:.:.:...._j ~f~ing: Fai!u(e to S8C':Jf8 workers' compensation coverage is unlawful, and shal.1 subject an employer lo ~~~:~fa~~~'.'~!~~~e~~~ f~~~!id~dtfo~ii l~~:~~j~ui181h~ f~1:rt d~~~;Z!~~st :iJ~11~~~~;~ef:t of Structural __ $L~3_3 __

OWNER BUILDER DECLARATION

I AM EXEMPT FROM THE CONTRACTORS LICENSE LAW FOR THE
FOLLOWING REASON:
□ I, AS OWNER OF THE PROPERTY, OR MY EMPLOYEES WITH WAGES

AS THEIR SOLE COMPENSATION, WILL DO THE WORK, AND THE

STRUCTURE IS NOT INTENDED FOR, OR OFFERED FOR SALE (SECTION 7044, OF THE BUSINESS AND PROFESSIONS CODE)
□ I, AS OWNER OF THE PROPERTY AM EXCLUSIVELY CONTRACTING

WITH LICENSED CONTRACTORS TO COMPLETE THE PERMITTED
PROJECT UNDER THE PROVISIONS OF SECTION 7044, OF THE BUSINESS & PROFESSIONS CODE.

Electrical
Mechanical
Plumbina
Plan check
Issuance __ $17.33 __
Microfilm __ $_5~QO __
Water Quality
Total Citv Fee Due$91.66 _
Seismic Fee
I certify that I have read this application and state that the above information is SB 14 73 correct, and that I am the owner or the duly authon·zed agent of the owner. I agree to comply with all city and state laws relating to building construction. I Total Amount Paid$96.66 1--------~·-----~----•·.,·----·-----------1 hereby authorize representatives of the City of Aliso Viejo to enter upon the ,,.n,...,o ,,..,.,.n+;,-,.,.,.rl nrnnorf., f,-,,- in.-r,o,..+inn ,-,, ,m,...,..,.,. 9 Signatur: of Applicant or Agent
I 2. /2-.,_/,,
Print Applicant's/Agent's Name rDat!
Issuance ApprovedJo;:inn;:i Stevens -
Date Issued
Ibu_Dec.22 . .20JJ __
Receipt Number
13452
Permit Number: _68806_ 1747

CONSTRUCTION AND PLANNING POOL AND SPA
APPROVALS Permit# APPROVALS Permit #
Date lnsp. Date lnsp.

1. Temporary Electrical Service or Pole

2. Soil Pipe--Underground 1. Pool & Equipment Location

3. Water Pipe--Underground / Underslab 2. Steel Reinforcement

4. Water Service 3. Electrical Bonding

5. Property Sewer/ House Connection 4. Rough Plumbing & Pressure Test

6. Electrical Conduit--Underground 5. APPROVAL TO COVER--GUNITE

7. Gas Line Underwound & Test 6. Electrical Conduit--Underground

8. Footings & Steel Ufer □ 7. Gas Pipe, D Underground, Test

9. Foundation''Slab on Grade 8. Backwash Lines, P-Trap, OUnd.

10. Retaining Wall Fooling 9. Backwash & Receptor--Final

11. Pre--Grout EJ Drainage 0 10. Fencing and Access Approval

12. Gas Pipe-Underground & Test 11. APPROVEDFOR PLASTERING

13. Rough Plumbg.ffop Out/Shower Pan 12. Heater & Vent--Finai

14. Roof Drains & Overflows 13. Plumbing System--Final

15. Rough "Eiectricai--Conduit 14. Electrical--Final

16. Rough Electrical Wiring 15. Solar System--Final

17. Rough Heatin_g & Air Conditioning 16. POOL/ SPA SYSTEM FINAL

18. Rough Factory Fireplace FIRE'DEPT. RE.QUIREMENT
APPROVALS Permit#
Date lnsp.

19. Ducts, Ventilating

20. Fire Dalllpers 1. UNDERGROUNDHYDRO

21. Floor Sheathing 2. PRODUCT PIPING OGAS 0 OIL

22. Roof Sheathing 3. UNDERGROUND FLUSH

23. Roof Framing 4. UND. STAG. TANK OGAS 0 OIL

24. Approved to Cover Exterior 5. OVERHEAD HYDRO

25. Roug~ Frame and Flashing 6. DRY CHEMICAL

26. "T" Bar Cai 1ihg!Elect:tf"1ecihanical 7. DRY STANDPIPE

27. insulation 8. FIXED SYSTEM FINAL

28. Lathing D interior D Exterior 9. FIRE PREVENTION FINAL

29. Dry.wall Nailing NOTES:

30. Electric Power Meter Final I, AS THE CONTRACT(?R,HEREBYAFflR~ U~l)E_R Pl:NALTY

31. Final Electric OF PERJURYTHA!,I,AMA.fl:RJ;IF!ED.:liO~EilMPROVEMENT CONTRACTOR'UNDERTHE PROVISIONS.OF. SECTIONS 7150

32. Final Sign AND 7151 OF THE STA""f;E OF CALIFORNIA'BUSINESS AND

33. Hood or Canopy Final
PROFESSIONS CODE.

34. Final Factory Fireplace DATE: CONTRACTOR:

35. Final Mechanical ,. . ··•·

36. Final·Plumbing

37. Water Service Final/Release
38, Gas Final Including Connectors

39. Solar Domeslic--Final

40. Re-roof Final

41. Retaining Wall Final

42. Handicap Regulations

43. Landscape • final

44. Zoining,-Final

45. Engineering--Final •

46. Health,,Final , I
47_. -~i~~L§_tt_l!ct!,fr~ &_B~ilding i../J/p/ I i tr'~
'"45_ Gas Rele"!'" •
C
. 49. El~S(fi9_'.~e_l~_11se
... lns~ctor's l~itials & Name I .. 1748
1 ' • CITY OF ALISO VIEJO •

COMMUNITY DEVELOPMENT

APPLICATION FOR TEMPORARY CERTIFICATE OF OCCUPANCY
ProjectName: IS" />161,-lro('IA.r'I' - A,.,,hc
3 (,.., 15,.,f'"",,,,;
Owner'sName -S-1'\f\'\fS L.. Q11 ,_,J 9 f PhoneNo.: qy-c'\-"I00--,,1'6 Job Address IS- Ae.. (ra/\fAv( .. A,,,, v-., )Q 1 (f\ c::i 2,. I, S- b Building Permit No. b '/5'2-) '-1 ' I b --s) / 'i3
I
Request is herby made for temporary use and occupancy on subject project only for a time period of 3 o days.

I am fully aware of Section 110 of the California Building Code which indicates, in part, that no building or structure shall be used or occupied until the Building Official has issued a Certificate ofUsc and Occupancy for the building. I also understand that the fee is for administrative costs and is not refundable if application is denied.

This <1pproval, if granted, will become void after 30 days, at which time a permanent Certificate of Use and Occupancy will be granted or occupancy terminated.

REASON FOR REQUEST -~7?>~-~~f:?'l~~"~v~'~'-~t_N_-~.,...~-"~l'~c-~Yl_,,,_~!l'~--~o=~4-~ll-~~5~'~"'~t-'~"~ 0 Fv/J &Nbu-~ j
/) Aglrof\l{vr, A lip V•t'.ju JC/> c,2.6l"l "7 yq - 100- 5) 00 Address ' Telephone
Fee: --------- Receipt No.: ________ _
Land Use Conditions of Approval Satisfied __________________ _ Condi,ions not Satisfied (to be completed prior to final use and occupancy) _____ _ Approved by Planning Director ______________________ _
Building Conditions not satisfied (to be completed prior to final use and occupancy) c-c---- z::::,~M= =:~t;t; c~1vfrB<0c C/ry rtYvo Date:
1749
,
oEcPARATION AND AGRELENT
City of Aliso Viejo
12 Journey
Aliso Viejo, CA 92656
In consideration of granting a Temporary Certificate of Occupancy for the area improved or established under Building Permit No/0} 2'5l£ we, the responsible parties, hereby acknowledge and agree, by signature, to the following: G, f 3LJ'
I. The Building Official is authorized to issue a Temporary Certificate of Occupancy (TCO), before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely.

2. The Building Official shall set a period of time during which the TCO is valid.

3. ' The Building Official is authorized to suspend or revoke, in writing, a TCO whenever the Certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of this code.

4. The owner/lease holder is responsible for and agrees to ensure occupancy does not extend beyond the defined TCO period. Further, that continued use and occupancy beyond the period granted is a violation of the California Building Code.

5. Renewal of the TCO may be granted for just cause. A new application and fees are due at the time of the request.

6. In signing this declaration and agreement the owner and contractor of record understands and agrees to the following stipulations.

A. The project shall be completed before the expiration date of the TCO, B. Completion of the project requires that all Building Department corrections must be satisfied with the final Building Department signature on the inspection record, and C. All other interested departments must have approved the C of 0.

OWNER/LEASEHOLDER (The entity to which the Contractor of Record is responsible, Circle One) Company Name: fj,,., b ""'" 7 " S'
Company Owner or Officer:
-YA,,.-, ?~ L .

Complete Address:

II r3 {!, I ft I) 02..6J/
Phone Number(s):

Date:

CONTRACTOR OF RECORD
Company Name:

Company Owner or Officer:
((.--{~
Complete Address:
-2-1113 ...).1>.0 .J -1><1 e . t\P-. w ""1 1 G o1lb
Phone Number(s):
5"=,2... • 0 C:,o , 3 -30
Signatur • ~ Date:

Y CERTIFIC.(TE OF OCCUPANCY APPLICATION NO. ___________ _ PROJECT ADDRESS: __________________________ _
Temp-occupancy Declaration
1750
City .Aliso Viejo
Building and Safety Division
12 Journey, Suite 100
Aliso Viejo, CA 92656
P: (949) 425-2540
F: (949) 425-3899
----'1"-5 __ '-'A'-'R-"G-"O"-'N"-A"'U-'-T _____ _
Apt/Ste: ____ _ Lot: APN: ______ _
Tract: Cross St:

Applicant: TOM YASIN
StreetAddress: 23122-E _A_L_C_A_LD=E_D_R _____ _
City: LAGUNA HILLS Zio: __ 9'-'2'-"6-"-53'--_
State: __ Q\_ Phone: __ ~) 382-6366 Cell:

Owner: AICI, LLC
Street Address: 2321 ROSECRANS AVE
APPLICAT. FOR BUILDING PERMIT

AND CERTIFICATE OF OCCUPANCY
Inspection request line 949-425-2545
Permit Number
68989
Plan Review No.:
68989
----~------------,
The followinQ work is authorized by this permit
~ Structural D Plumbina ~ Electrical D _Mechanical
Type af Project
181 New D Addition D Occupancy Permit
D Alteration D Demolition
D Repair D Tenant Improvement
Sa.Ft.
=S~IG~N~------~
City: EL SEGUNDO Zio: ___ 9~0_2_4_5 __ , ____________ ,, __ State: __ Q6__ Phone:_(310) 725-0006 Cell:

Ena/Arch: _____________________ _
Phone: License#:

LICENSED CONTRACTORS DECLARATION
I HEREBY CLAIM, UNDER PENAL TY OF PERJURY, THE FOLLOWING i========================j STATEMENT: THAT I AM LICENSED UNDER PROVISIONS OF CHAPTER 9 Zoning Approved By: J__L COMMENCING WITH SECTION 7000 OF DIVISION 3 OF THE BUSINESS I--=::'.'..'.~~!:'.t'.:~~:._':'._~_::::::::'.:":'.:::===========-----I AND PROFESSIONS CODE, AND AT THIS TIME MY CONTRACTORS Remarks/Special Conditions/Project Description LICENSE IS CURRENT, ACTIVE AND IN FULL FORCE. INSTALL ILLUMINATED WALL SIGN TO READ "AMBRY Contractor: YASIN SIGN SOLUTIONS GENETICS". FIELD VERIFY FOR CODE COMPLIANCE.

Street Address: 23122-E ALCALDE DR
City: LAGUNA HILLS Zio: 92653
State:_ CA_ Phone: _(949)_ 382-6366 Cell:

LIC. #: 852671 Exo. Date: 1/31/2013 CLASS: C61, 042

CONTRACTOR TO PROVIDE ACCESS TO ROOF & ATTIC

WORKERS' COMPENSATION DECLARATION

HEREBY CLAIM, UNDER PENAL TY OF PERJURY, ONE OF THE
i OWING STATEMENT:

HAVE AND WILL MAINTAIN A CERTIFICATE OF CONSENT TO SELF

RE FOR WORKERS COMPENSATION, AS PROVIDED FOR BY
SECTION 3700 OF THE LABOR CODE FOR THE PERFORMANCE OF THE WORK FOR WHICH THIS PERMIT IS ISSUED.
□ I HAVE AND WILL MAINTAIN COMPENSATION INSURANCE AS
REQUIRED BY SECTION 3700 OF THE LABOR CODE FOR THE
PERFORMANCE OF THE WORK WHICH THIS PERMIT IS ISSUED. i,,,,,,,,,,,,,,,:-7--,-7 Workers' Comoensation Carrier

HARTFORD CASUALTY INS CO
Policy#
72WECDD4981
Exp. Date
4/4/2012
CERTIFICATE OF WORKERS COMPENSATION EXEMPTION All work shall conform to the 2010 C.B,C,, 2010 C.M.C., /TH1SSECTIONNEEDNOTBECOMPLETEDtFWORKIS$soooRLESS! 2010 C,P,C. and the 2010 C.E.C. q CERTIFY UNDER PENALTY OF PERJURY THAT IN THE PERFORMANCE ,-------------------------1 OF THE WORK FOR WHICH THIS PERMIT IS ISSUED, THAT I SHALL NOT Grouo/Division/Tvoe Hiah Fire Hazard EMPLOY ANY PERSON IN A MANNER so AS TO BECOME SUBJECT TO □ Yes □ No THE WORKERS COMPENSATION LAWS OF CALIFORNIA, AND AGREE i-=============---____:=--___ ____::.___-1 THAT IF I SHOULD BECOME SUBJECT TO THE WORKERS Valuation Fire Sorinklers COMPENSATION PROVISIONS OF SECTION 3700 OF THE LABOR CODE$5.:L90,QO O Yes O No THAT I ~HAI I FORWITH r.nMPI Y.WITH TH()SF PRO\/\SIONS ~=============------==-.:..:=---=:_:_:..::....-1 ""-'.ar~ing: Failure to secure "."orkers' compensation coverage Is unlawful, and shal.I subject an employer to cnm1nal penalties and civil fines.up to oi:ie hun~red thousand dollars ($100,000), m add1!Ion to the cost of compensation, damages as provided form Section 3706 of the labor Code, interest, and attorney's fees

OWNER BUILDER DECLARATION

I AM EXEMPT FROM THE CONTRACTORS LICENSE LAW FOR THE
FOLLOWING REASON:
□ I, AS OWNER OF THE PROPERTY, OR MY EMPLOYEES WITH WAGES

AS THEIR SOLE COMPENSATION, WILL DO THE WORK, AND THE

STRUCTURE IS NOT INTENDED FOR, OR OFFERED FOR SALE (SECTION 7044, OF THE BUSINESS AND PROFESSIONS CODE)
□ I, AS OWNER OF THE PROPERTY AM EXCLUSIVELY CONTRACTING

WITH LICENSED CONTRACTORS TO COMPLETE THE PERMITTED
PROJECT UNDER THE PROVISIONS OF SECTION 7044, OF THE BUSINESS & PROFESSIONS CODE.

I certify that I have read this application and state that the above information is correct, and that I am the· owner or the duly authorized agent of the owner. I agree to comply with all city and state laws relating to building construction. I hereby authorize representatives of the City of Aliso Viejo to enter upon the ohn"o ~on,;M~~•o•
Signature of Applicant or Agent
~vr1a 5 l/4 51/1
Print Applicant's/Agent's Name
Structura1$:L51 .. 35
Electrical$5.Q!l __ _
Mechanical
Plumbina
Plan check __ $9,~8=.3=8 __
Issuance ___ $34.66 __
Microfilm __ $_10~0_0 __
Water Quality
Total Citv Fee Due _ .. $J91.09_
Seismic Fee ___ $-1.0.9 __ _
SB 1473 ___ $.1,_0_Q __
Total Amount Paid$3Q1 .56 __ _ 1-----
lssuance Approved -- Joanna Stevens
Date Issued I Receipt Number
ue._Eeb-2L20J2 ____ I_ 13710
Permit Number: , ___ 68989_ 1751
• CONSTRUC]ION AND PLANNING POOL AND SPA
APPROVALS Permit# ___ _ APPROVALS:Permit-·# ____ _
Date lnsp. Date lnsp.

1. Temporary Electrical Service or Pole

2. Soir Pipe--1:Jnderground 1. Pool:& Equipment Location

3. Wat.er Pipe--Underground / Underslab 2. Steel'Reiiiforcement

4. Water Service 3. Elec:trical Bonding

5. F!roperty Sel'/er_!House Connection 4. -Bough Plumbing &:Pres~ufe 'rest :_ ---·•. --· -· ·'---- ----·- " ....

6. Electrical Conduit-:Undergrounci 5. APF!i=tOVAL TO:COVERH3UNITE

7. Gas Line u~_dergrnund a.rest .

8. Footings & Steel • ' 7. Ga~ ~ipe._ -D UndElrgrouha: Test - .

9. Found_ation--Slab on Grade R 13ackwash Li~es1 R'Trap, o Und,

10. Retaining:WalLFooting

11. Pre- 0Giout D Drainage D _
1 1 '. : m Fencing and Acee~ l\pproval

12. GasPipe.Ur,9erground & T~st 11. APPROVED :r;:oR:F!tASTERING

13. Rough F!lumbgJTop Out/Shower Pan • 12, He~ter.& vi,nt',Final

14. Roof Drains & Overflows , : 13. Plumbing Systiim--Fihal

15. RoughEla.ctri9a1,.coriduit • 14. ElectricalH,inal ..

16. _Rough ElectficaliWiring 15: Sola! System1_,'Final
• 17. Rotigh Heating & Air Conditioning 16, ROOll/SPASYSTEMFINAL

18. Rough Factory Fireplace

19. Ducts, Ventilating
FIRE D_EPT,'FIE9UIREMENT
APPROVALS l'ermit # ____ _ Date lnsp.

20. Fire [)arnR~(S 1. u~p_~RGROUNDHYDRO
2L Floor Sheattiing 2. PRdbUCT F!1iilNG . .GAS D OIL' .

22. Roof Sheathing_ 3. UNDERGROUND F.LUSH . •.
2~. Roof Framing 4. UNO: STAG: 1:ANK O GAS D OIL

24. Approved to Cover Exterior 5, oVER8EAoHvbim

25. Rough Frame an_d Flashing 6. OBY CHEMICAL

26. '':f"'Bar,.Ceiling/Elect./Mechanical

27. Insulation 8. i:;1xfosvsTEMflNA~
28, La.thinlJ Interior D Exterior 9. EIRE PREVENTION FINAL . _29, Drywall Nailing, ; '. NOTEsi
...,i _3_ci_. ~E_l"~•c~tn~·c~P_o_w_e~r •• _M_e_te_r.·~i;_in_·a_1 ____ -+----+----,,1:; I; AS THE CONTRACTOR, 'HEREBY AFFIRM UNDERP.ENALTI , 31. Filial Electric 1 i OF PERJURY THATJAM A CERTIFIED HOME.IMPROVEMENl' l'--"--~---"-~~----------11,-----±---;' ICONTRACTOR UNDER THE l'ROVISIONS OF._ SECTIONB7150 1 32. Final Sign , AND 7151 OF. THE:STATE oi=:CALIFOf:INIA BUSINESS AND 1---~~-~---------,1,----+.----'I,: RROF.E_SSIONS CODE.
, 33. Hood _or Canopy Final
. ', 34. Finiil.,F£!clory'Flreplace
'. 35. Final Mectfanical
,' 36, Fina!Pli.frnfji~g,
: 37. _ ,Yater Service Final/Release
' 38, Gas Final Including Connectors
1 39; Solar Domestic-°Fi~al· . '

40. Re-roof Final . .
•, 4 l. Retaining w,all final
, ,42: Handi~ap R~gulations
. 43. Landscape Final
. 44. Zoiiiing:'Final
' ' 45, Engiheeiing;'Final •
, 46. Health-°Final •

48.' Gas Release:
. ,. 49,,·Electric _F'lelease ___ , _
• DAlE: _____ CONlRACTOR:.~----~---
, . I I
1;
I
'I _.,'_ .. _•.1 ... ns __ p_e_'c .. t_o_r:_s· .. 1n_1t_1~_,s_1& ___ N_a .. m ..·e_· . .L T ...... ___ -_.:.,_ _________ ... : :.I----'------~•:.· ________ ..... ___ ..... _________ ... 1752 I
Proposed New Building Sign 3~ St,f+=_
17'4
37" _ROOf- LINl8'
ArrttyGenetics ~ I
,,ffo·;.,._~·1_;."\ . -- - -- --
--- ~---- ------~-
J_
30'
Il s nl:tn ha!'> t ~n .c,,
cl 1$ ti • (It
'\ 11 cc 1
t\PPKUvED:
">ATE:_ U .,.. ~ '7· .7-\· lY
'rlMMP.-
NOTE:
•" Vieio
<
ALL CHANNEL LETTER WILL BE U.L. Approved.

ALL BUILDING PENETRATIONS WILL BE WATERPROOFED.
, .. ""' ui I""'"• "'N ~ ..... ~•=~ __ _____ --~ I Jed, modified c altered without au'.horization from the building official, and all woo: r_eg~ lated by this code Shaff be done in ecoortlance wllh these approved p!ans Ibis 'i •1:occ Pt0701'CQ cl 1) :Jcret (II ll!l(lfOVlli of ~ns. r:,ecffications 01 computationS s11a11 not t>e cons1 ered 10 oe a pt:1111 .o1 a u,1@ O0..1 a any vlolation of anv of lhe provisions of this code or of any other onl:nance of Ille JU"'.,;:,·- • J 10 give~"•~ , • ·., • ·,;
r-~ · ·-::,. ~?uT,~
This is an original unpublished design created for your personal use with a project being planned by Vasin Sign Solutions, Inc.

It should not to be shown to anyone outside your organization, nor should it to be copied, reproduced or exhibited in any fashion.

If design is copied, reproduced or shopped around, client will be charged design rees or subjected to legal action. :, OATE PROJECT NAJJE CLIENT ~E CLIENT Al'l'ROVAL 1110 OATf UVIMOH = ., ~. 8 2/14/12
o I ~ .... .., • TV (,.)

AMBRY GENETICS BUILDING SIGN SAME
~DORESS
15ARGONAUT
CIJY·STAlE
ALISO VIEJO, CA 92656

ADDRESS

CITY/STATE
,AOP!:RTV DWN~RAP,itOVAL
23t22-EAlcal1e Or.
(1ls, CA 92653 JI 6366
i71
-
-
1753
T l
37" 19"
l -i-
-t14"
-IProposed New Building Sign Detail
17'
t- 28" -f
Ambry Genetics™
Logo color to match PMS 299 C
Logo to be individual channel pieces

SIGN DETAIL
7" ts"~ _
-'~'· ? .\.
s· deep aluminum
fabricated channel
letters returns
painted Black
~ -;.
~ ~ 't ri,~ Obconnt-ct Swnch
I ' • "1
NOTE:

Perforated Black
vinyl film. Letters to be
Black during day & White
at rught--------1
WHITE LED I ~
lighting
non-ferrous screws
and anchors
thread Into wall.

Min. 4 per letter
AU CHANNEL LffiER WILL BE U.L Approved.
..... ~~:;num 1•br1a1tf1 OF ALISO VIEJC
ay APPROVED qJ\~ ERMIT ,ssUANC~ __ ...,l _.-,.. . ,callonS shall no\ be l;ll<ll'l!"'!• 111uuuied Of :Lof;,~ 116110\Wl"!i • , ffom tt,e bulldin9 official, and~ woe\ regu- Y,PtlY be cne In accordal\C.e wi1h these 2~ plans .!1 ng 1 1 a permil of approval of~ s~ or I w,npuwi.u,~ ..hall no\ be ~;\S\dered to be a permit fof OI'~~ ol A uminum Fab • ary viola~ of any ol the ;r()VisionS of ~code 01 ~f afi'/ ~onfinance El , ncated Rae .;.fl,hejllnsd1Cll0f1 ~er: .. ' preS\inu!lQ\oQ1V83\.'\hOntyto~~orcancel ectncal to r/w b eway "' ,,,....., • ,,. "" • ""',,_, •""'·-""'not Y other :ievabtl BY .. . . _ _ __ OATL , _ L _ -
This is an original unpublished design created for your personal use with a project being planned by Vasin Sign Solutions, Inc.

ALL BUILDING PENETRATIONS WILL BE WATERPROOFED. It should not to be shown to anyone outside your organization, nor should it to be copieds reproduced or exhibitea in any fashion. If design is copied, reproduced or shopped around, client will be charged design rees or subjected to legal action. .. DATE
§ 2/14/1 2 "' . ~ I ~-.. c.,
L
P~O..ECT NAUE CLIENT ~tE

AMBRY GENETICS BUILDING SIGN SAME

ADDRESS
15ARGONAUT

CITY'STATE
_I\LISO _\II_EJO, CA 92656

ADDRESS

CITY/STATE
CL.IEfrn'A"ROW.L
,RO,r.RTV OWMU Att,ROVAL
"° !Mn 111.r,a10ti1
n 6 ~ Sin 23122-EAlcaie Or.
.... Yf Sign Laguna Hdls,CA92653 , (949) 382~ 366 Solutions Uc. 11852671 1754
Site Map
• N
~"
/,
Proposed new
sign location

AMBRY GENETICS BUILOING SIGN
15ARGONAUT
ALISO VIEJO, CA 92656
'.JO
ICE
,--- _:\ 01 ~s IIIIU .. .,w,--- be changed, modified or ar.ered wi'.hoUt aa'.holllllion from \he bUl\dlllll o1ficial, and an work regu1ted ty \his code sha'l be dOne lll aa:omance w\tll theSe ~ed plans . ---• A. ""'ntina al a ~'!?'jt of approval of planS, ~ or • ,~ hA a oer:nlt tor or 1111 aooroval of compll'.al."ln> ii, ... , ~· -- - any W)!ation ol any of !he orov'.s.'O!lS ot lll!H;IJlll:l .. v• V" I - - • • of \he iutlsdk;tio:' l't:'!.:IS p:-esumilll le give ai.-\l'OrilY lo violate or cancel •"'A" ,., th,~ code r1 ottl!ll ordinal\C2S of \his junsdic\1011 &hall not NOTE:

AU CHANNEL LETTER WIU BE U.L. Approved, This is an original unpublished design created for Y.OUr personal u~e wftn a project being planned by Vas in Sign Solutions, Inc.

It should not to be shown to anyone outside your organization, nor should it to be copied, reproduced or exhibitea in any fashion. ALL BUILDING PENETRATIONS WILL BE WATEIIPIIOOFED, -. :>ATE
(.,) ! 2/14/12 0 i _,,., .,, I TV (.,)
P~O..EC T NiUIE CLEN'T NAME

AMBRY GENETICS BUILDING SIGN SAME

ADORESS
15ARGONAUT
CITVSfATf
ALISO VIEJO, CA 92656
A:)OACS3
Clf'V/SfAftIf design is copied, reproduced or shopped around, client will be charged design rees or subjected to legal action.

CLaNTA,,IIOYAL ICI OAT't UWll,CMr,f
,1t0,e.1nv OWN"U: A.PPIIO\-AL
"' ·"· Yasin 23122-EAJcakle Dr, --....TJ, Sign Laguna H,ls, CA 92653 • (949) 382-6366 '
Solut10ns Uc . .ta52611
___J
-
-
1755
0 I\)
--
-
"' -I\)
0 (.11
0 "'
-c,
a:
)>
a:
"' :c
-<
G')
m
z
m
--i
H
(")
CJJ
(")
0 :c
-c,
0 :c
~ H
0 z
-c,
D>
(0
(D
I
.

Proposed New Building Sign
I I
8'
_l_
30'
-
AU.QWUIB.Uffllt'WILL IE w.,.._...i,
a.al.WINO PENETRAl'IONSlfflL llli VfA'M::CCCED.
~~~:;g;~li~~~~~;~·f:~':;,'~;~.;i:;.0
:
1 ~i,ce1
\S _ _.aot\S sha\\ ~$te BfO~i()l"ISO ta I;)'§ au\llo_n_\'1,~0-,,dicllOD sna\\ not ~.u'l\atloh di Jl:h .... :,ts nre~Gitllii§ j,-.... !nces m 11nv j an1 ol 111•
"<
1'1.
nsdiclion
51•005 o1 \his
re!,.. cod•°' • o\llel o,ul•~" •""' ------- • ~
111• 9,o" o~• ~ ------- c:_
n••~ -
lhisfsano~gnalunpimlisheddaign~foryourpeisonalu;.,'MdlaprojectbelngplalYledbyVasl~gn~~c. rt should not to beshcnm man)'O!leowicleyour'!l'!Jilnlzation, nor .should it to lie r;opi!!d. ,wroduted crexhibitea in any fashion.

If design is copied,reproduced ouhopped amull4dientwlll be charged desigiifues orwbjected to legal action. rn PRO,ll!C"I"~ Q.PTIWIB
--~--- -- .• ¼$in 23<22<-... _ 4/12 AMBffYGENE11CSBUILONlSIGN SAME ' oJ -er - r--- ' . Sign. i.n,HhCI\\IISS3
"" TV • 15 ARGONAUT
~ .

So .. [91>]-
- ~ .. --. ' Jutions LJo. • _,., . Al.ISO VIEJO CA 92li5ll .&.~IL.LC-.
•
•
~
~
=
?
"' C
"'
_,,.

C
_,,.
~ "'
2 0
"-'
"' "'
~
1756
Proposed New Building Sign
17'---1
8'
Ari>ryGenetks ':TI: 137" ------------------------~Q.QE.LI_NE ------------ ·----- _J_
30'
NOTE:

AU CMANNEL LfflD WIU. IE U.L Approved.

AU BUILDING ,ENfflAJIONS Will II WATIRPROOFED,
~ E
lr .....
11 • n" all wr~~ regu
- 1115
SC
l !of ry SP approval 0
11 any .i1t1e1 'lldinance
:ty 10 violate or canc.e
the provisions of 1his code or other oro1nanu:, u, u•is jur'sdiction s.tiall no tlP. yali<I_.

This Is an original unpublished deslgQ created for Y.OUr personal use with a pro~ being planned by Vasin Sign Solutions Inc.

It should not to be shown to anyone outslde your organization, nor should It to oe copied, _reproduced or exhibited ln any fashion.

If design Is copied, reproduced or shopped around, cllent will be charged deslgn rees or subjected to legal action. ':!!!! .... ,--
~· ~in 23122-ENcakleDr. II
•:-~ff ~~ / ! I ~ Solut1fn1s :f ~ 92663 • l . .
(ADDftDS
-
-
-
1757
T T ~
! . I

A DELAWARE LIMITED LIABILITY COMPANY
2101 ROSECRANS AVENUE, SUITE 4305
Ambry Genetics
15 Argonaut
)J.i'Y: "· .:'·1 •\ l -~., ·= .\ .. j: ·, • , t.,i_-
To whom it may concern;
TELEPHONE (310) 414-0006
FACSIMILE (310) 414-0007
On behalf oi AlC1 U.,C, I authorize the placement of the Ambry Genetics sign on the building located at 15 Argonaut as specified in the attached document.

Feel tree to give us a call at (310) 414-0006 if you need further assistance or have any questions.

Sincere~y,j
~- ◄ ~:-it;·'<:-~
V \)
Marisa Heinecke
• • 1758
City of Aliso Viejo
Job Information
Street Address: 15
Apt/Ste:

Building and Safety Division
12 Journey, Suite 100
Aliso Viejo, CA 92656
P: (949) 425-2540
F: (949) 425-3899

ARGONAUT
Lot: APN : --
Tract: Cross St:

Applicant: W ILLIAM MARLOWE
Street Address: 525 NEW JERSEY ST STE A
City: REDLANDS Z ip:

State: CA Phone: (909) 557-6312 Cell:

Owner: BLT ENTERPRISES
Street Address: 1714 16TH ST
City: SANTA MONICA Zip:

State: CA Phone: (31 0) 314-0800 Cell :

Eng/Arch:

Phone: License # :
92373
90404

LICENSED CONTRACTORS DECLARATION

I HEREBY CLAIM, UNDER PENAL TY OF PERJURY, THE FOLLOWING STATEMENT: THAT I AM LICENSED UNDER PROVISIONS OF CHAPTER 9 COMMENCING WITH SECTION 7000 OF DIVISION 3 OF THE BUSINESS

AND PROFESSIONS CODE, AND AT THIS TIME MY CONTRACTORS
LICENSE IS CURRENT, ACTIVE AND IN FULL FORCE.

Contractor: CLARK ROOFI NG
Street Address: 525 NEW JERSEY ST STE A
City: REDLANDS Zip: 92373
State: CA Phone: {909} 335-6300 Cell:

LI C. # : 765388 Exp. Date: 7/31/2019 CLASS: C39

CONTRACTOR TO PROVIDE ACCESS TO ROOF & ATTIC

WORKERS' COMPENSATION DECLARATION

I HEREBY CLAIM, UNDER PENALTY OF PERJURY, ONE OF THE
FOLLOWING STATEMENT:
[i;I-- I HAVE AND WILL MAINTAIN A CERTIFICATE OF CONSENT TO SELF

INSURE FOR WORKERS COMPENSATION, AS PROVIDED FOR BY
SECTION 3700 OF THE LABOR CODE FOR THE PERFORMANCE OF THE ~

K FOR WHICH THIS PERM IT IS ISSUED

I HAVE AND WILL MAINTAI N COMPENSATION INSURANCE AS
UIRED BY SECTION 3700 OF THE LABOR CODE FOR THE
PERFORMANCE OF THE WORK WHICH THIS PERMIT IS ISSUED.

Workers' Compensation Carrier Policy # Exp . Date
AMERICAN ZURICH INS CO WC9000854 12/31 /20 17

CERTIFICATE OF WORKERS COMPENSATION EXEMPTION
(THIS SECTION NEED NOT BE COMPLETED IF WORK IS $500 OR LESS) q CERTIFY UNDER PENALTY OF PERJURY THAT IN THE PERFORMANCE

OF THE WORK FOR WHICH TH IS PERMIT IS ISSUED, THAT I SHALL NOT

EMPLOY ANY PERSON IN A MANNER SO AS TO BECOME SUBJECT TO

THE WORKERS COMPENSATION LAWS OF CALIFORNIA, AND AGREE

THAT IF I SHOULD BECOME SUBJECT TO THE WORKERS
COMPENSATION PROVISIONS OF SECTION 3700 OF THE LABOR CODE THAT I SHAI I FOR\NITH r.OMPI Y \/1/ ITH THOSF PRO\/JSIONS Warning: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees

OWNER BUILDER DECLARATION

I AM EXEMPT FROM THE CONTRACTORS LICENSE LAW FOR THE
FOLLOWING REASON :
□ I, AS OWNER OF THE PROPERTY, OR MY EMPLOYEES WITH WAGES

AS THEIR SOLE COMPENSATION, WILL DO THE WORK, AND THE

STRUCTURE IS NOT INTENDED FOR, OR OFFERED FOR SALE (SECTION 7044, OF THE BUSINESS AND PROFESSIONS CODE)
□ I, AS OWNER OF THE PROPERTY AM EXCLUSIVELY CONTRACTING

WITH LICENSED CONTRACTORS TO COMPLETE THE PERMITTED
PROJECT UNDER THE PROVISIONS OF SECTION 7044, OF THE BUSINESS & PROFESSIONS CODE.

I certify that I have read this application and state that the above information is correct, and that I am the owner or the duly authorized agent of the owner. I agree to comply with all city and state laws relating to building construction. I hereby authorize representatives of the City of Aliso Viejo to enter upon the dAJSfi M:: Q~ n"rnMa~ Signature of App licant o • A genr
w-\. lA t ~""' ~~v \0"'"''€... s-,o-\1
Print Applicant' s/A gent' s N ame D ate

APPLICATION FOR BUILDING PERMIT

AND CERTIFICATE OF OCCUPANCY
Inspection request line 949-425-2545
Perm it Numbe r 1 Pla n Review No. :
79247 79247
The follow in g work is a uthorized by this permit
~ Structu ral n Plumbina n Electrical n M echa nical
Type o f Project
ew Add iti n D Occupancy Permit
~ A lteratio n D D e m o litio n
D Repa ir D T e nant Improve m e nt
Sq. Ft. Sq .Ft.

REROOF 200000
Z o ning A pproved By:

Remarks/Special Conditions/Project Description

TEAR OFF EX ISTING BUR ROOF SY STEM A ND INSTA LL
NEW BUR ROOF SYSTEM .

C&D A PPROV ED - COLLEC TED $1500 DEPOSIT.
n /') p-c,, '74s-/$J / 7
j{J(!UI, ~¢~· ~ (gJ?).I j_,'-,,) (Ju ,.5-r
This permit shall expire if the building or work authorized by such permit is suspended or abandoned for a period of 180 days.

All work shall conform to the 2016 CBC, CMC, CPC,
CE~, CRS CGC and 2016 CA~nergy Code. - G roup/ D ivision/T ype Hig h Fire Haza rd Yes o - - -- V aluation Fire Sprin klers
$125 000.00 es No
Building $1 103.53
Electrical
M echa nical
Plumbinq
Plan c heck
Issuance $ 17 .33
S canning $3.00
W ate r Q ual ity
Tota l City Fee Due $1 120.86
SMIP
SB 1473 $5.00
Total A m o unt Pa id $1 128.86 - ------- ---
Iss uance A pproved Joanna Stevens - - -----. -- --- Date Iss ued Receipt Number Tbu Aug 10 2n17 23201
-- -- --- ~- - --
Permit Number: Z924Z 1759

CONSTRUCTION AND PLANNING POOL AND SPA
APPROVALS Permit# APPROVALS Permit #
Date lnsp. Date lnsp.
· 1. Temporary Electrical Service or Pole

2. Soil Pipe--Underground 1. Pool & Equipment Location

3. Water Pipe--Underground / Underslab 2. Steel Reinforcement . 4. Water Service 3. Electrical Bonding

5. Property Sewer/ House Connection 4. Rough Plumbing & Pressure Test

6. Electrical Conduit--Underground 5. APPROVAL TO COVER--GUNITE

7. Gas Line Underground & Test 6. Electrical Conduit--Underground

8. Footings & Steel UferO 7. Gas Pipe, 0 Underground, Test

9. Foundation--Slab on Grade 8. Backwash Lines, P-Trap, OUnd.

10. Retaining Wall Footing 9. Backwash & Receptor--Final 11 . Pre--Grout 0 Drainage 0 10. Fencing and Access Approval

12. Gas Pipe-Underground & Test 11 . APPROVED FOR PLASTERING

13. Rough Plumbg./Top Out/Shower Pan 12. Heater & Vent--Final

14. Roof Drains & Overflows 13. Plumbing System--Final

15. Rough Electrical--Conduit 14. Electrical--Final

16. Rough Electrical Wiring 15. Solar System--Final

17. Rough Heatin,g & Air Conditioning 16. POOL/ SPA SYSTEM FINAL

18. Rough Factory Fireplace FIRE DEPT. REQUIREMENT
Date lnsp.

19. Ducts, Ventilating APPROVALS Permit#

20. Fire Dampers 1. UNDERGROUND HYDRO
21 . Floor Sheathing 2. PRODUCT PIPING OGAS 0 OIL

22. Roof Sheathing 3. UNDERGROUND FLUSH

23. Roof Framing 4. UNO. STAG. TANK OGAS 0 OIL

24. Approved to Cover Exterior 5. OVERHEAD HYDRO

25. Rough Frame and Flashing 6. DRY CHEMICAL

26. "T" Bar Ceiling/Elect./Mechanical 7. DRY STANDPIPE

27. Insulation 8. FIXED SYSTEM FINAL

28. Lathing O Interior D Exterior 9. FIRE PREVENTION FINAL

29. Drywall Nailing NOTES:

30. Electric Power Meter Final I, AS THE CONTRACTOR, HEREBY AFFIRM UNDER PENALTY

31. Final Electric OF PERJURY THAT ,I AM A CERTIFIED HOME IMPROVEMENT CONTRACTOR UNDER THE PROVISIONS OF SECTIONS 7150

32. Final Sign AND 7151 OF THE STATE OF CALIFORNIA BUSINESS AND Hood or Canopy Final
PROFESSIONS CODE.

33. 34. Final Factory Fireplace DATE: CONTRACTOR: -

35. Final Mechanical ..·,v····~) ~~·· •,

36. Final Plumbing

37. Water Service Final/Release

38. Gas Final Including Connectors

39. Solar Domestic--Final

40. Re-roof Final 9J ~f J:1n Jr/ ,/k,u;/ , , .

41. Retaining Wall Final

42. Handicap Regulations

43. Landscape Final

44. Zoining--Final

45. Engineering--Final

46. Health--Final

47. Final Structure & Building 't/J5hl),1 ,// ..J. Arllll"/1

48. Gas Release

49. Electric Release
***Inspector's Initials &.Name 11/J~AI~~ vJ/1£/£r~@- .\ - ,..., 1760  



  








 

  


    



!
"#$%&'()!*&+

"!
!


 
,




 

-




 .

 


//



  


/0


0
#$%&'!&&
+1
() Stantec
m
1761

THIS PAGE INTENTIONALLY LEFT BLANK
1762
FCS
E.2 - Phase II Environmental Site Assessment
1763

THIS PAGE INTENTIONALLY LEFT BLANK
1764
Phase II Environmental Site
Assessment
Stantec Consulting Services Inc.

Prepared for:

Brandywine Homes
Prepared by:

Stantec Consulting Services, Inc.

Date:

September 4, 2025
Project/File:
185807004
15 Argonaut
Aliso Viejo, California 92656
1765
Phase II Environmental Site Assessment
Disclaimer
The conclusions in the Report entitled Phase II Environmental Site Assessment are Stantec’s professional opinion, as of the time of the Report, and concerning the scope described in the Report. The opinions in the document are based on conditions and information existing at the time the scope of work was conducted and do not take into account any subsequent changes. The Report relates solely to the specific project for which Stantec was retained and the stated purpose for which the Report was prepared. The Report is not to be used or relied on for any variation or extension of the project, or for any other project or purpose, and any unauthorized use or reliance is at the recipient’s own risk.

Stantec can neither warrant nor guarantee that all information received from Brandywine and third parties in the preparation of the Report is correct. While Stantec has exercised a customary level of judgment or due diligence in the use of such information, Stantec assumes no responsibility for the consequences of any error or omission contained therein.

The work performed herein was done in conformance the Master Services agreement between the Client and Stantec (the “MSA”). In the event of any conflict between this document and the MSA, the MSA will prevail. Any reliance on this document by any third party is strictly prohibited. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document.

Prepared by:

Signature
Alicia Jansen
Senior Scientist
Reviewed by:

Signature
Jim DeWoody
Principal Scientist
Approved by:

Signature
Kyle Emerson, CEG
Senior Principal Geologist
1766
Phase II Environmental Site Assessment
Table of Contents
Project: 185806577 i
Table of Contents
Executive Summary .................................................................................................................................... ii Acronyms / Abbreviations......................................................................................................................... iii 1 Introduction .................................................................................................................................... 1

1.1 Property Description and Operations............................................................................................... 1

1.1.1 Site Geology and Hydrogeology ...................................................................................................... 1

1.2 Background ...................................................................................................................................... 2 2 Field Investigation.......................................................................................................................... 1

2.1 Pre-Field Activities ........................................................................................................................... 1

2.2 Investigation ..................................................................................................................................... 1

2.2.2 Soil Boring and Sampling Protocols................................................................................................. 2

2.2.3 Soil Vapor Probe Installation............................................................................................................ 3

2.2.4 Soil Vapor Sampling......................................................................................................................... 3

2.2.5 Field Equipment Cleaning Procedures ............................................................................................ 4 3 Laboratory Testing Program......................................................................................................... 5 4 Investigation Results..................................................................................................................... 6

4.1 Field Observations ........................................................................................................................... 6

4.2 Analytical Results............................................................................................................................. 6

4.2.1 Soil Results ...................................................................................................................................... 6

4.2.2 Soil Vapor Results............................................................................................................................ 7 5 Discussion and Recommendations ............................................................................................. 8 6 Limitations ...................................................................................................................................... 9 List of Figures
Figure 1 Subject Property Location Map
Figure 2 Subject Property Details
List of Appendices
Appendix A Laboratory Data Sheets
1767
Phase II Environmental Site Assessment
Executive Summary
Project: 185806577 ii
Executive Summary
Stantec Consulting Services, Inc. (Stantec) has performed a Phase II Environmental Site Assessment (ESA) of the property located at 35 15 Argonaut, Aliso Viejo, Orange County, California (the “Subject Property” Figure 1), on behalf of Brandywine Homes (the “Client”). The work was performed according to the requirements of the Master Services Agreement between Brandywine Homes and Stantec (the “MSA").

The Subject Property consists of approximately 4.35 acres of land associated with Assessor’s Parcel Numbers (APNs) 623-093-10 and 623-093-11, and the address of 15 Argonaut, Aliso Viejo, Orange County, California. According to records obtained through Environmental Data Resources (EDR), the Subject Property appears to have been vacant from at least the 1930s to 1980s and was commercially developed with one structure and asphalt parking lot by 1989 in its present-day configuration. The Subject Property building is currently vacant. The adjoining properties and vicinity are developed with commercial/light industrial businesses and residential properties. A Subject Property Location Map is provided as Figure 1. A Subject Property Vicinity Map illustrating the main features of the Subject Property and vicinity is provided as Figure 2.

The following potential vapor encroachment condition (pVEC) and recognized environmental condition (REC) were identified during the Phase I ESA completed for Subject Property dated July 14, 2025:
• A west-adjoining fuel station located at 23022 Aliso Creek Road is listed as a gasoline service station since 1996 that reportedly houses three active underground storage tanks (USTs) installed between 2004 and 2016. The USTs range from 10,000 to 20,000 gallons in size and contain diesel, regular and premium unleaded fuel. A minor spill of two gallons of fuel was reported in 2018 due to a vehicle overfill onto concrete. The spill was cleaned by onsite personnel. The site received permit-related violations between 2014 and 2016 which were returned to compliance. No releases are reported at the site. Given the proximity of the fuel station to the Subject Property, and no documented assessment of soil, soil vapor, or groundwater at the site, as well as inferred groundwater flow to the east, this site represented a potential VEC and was considered a REC for the Subject Property.

Accordingly, to evaluate the concern identified above, Stantec performed a Phase II Environmental Site Assessment to evaluate subsurface conditions at the Subject Property.

Phase II ESA Results
All work was conducted under the direct supervision of a State of California professional geologist.

Stantec provided the services of a field geologist to supervise and direct all on-site activities performed during this investigation, which included the following:
• Stantec obtained an Underground Service Alert (USA) ticket number prior to commencement of drilling activities. Additionally, Stantec subcontracted a private utility locator to clear all proposed boring locations.
1768
Phase II Environmental Site Assessment
Executive Summary
Project: 185806577 iii
• On August 26, 2025, Stantec personnel oversaw the advancement of three (3) soil vapor borings (SV-1 through SV-3) to 5-feet below ground surface (bgs) on the Subject Property. • On August 28, 2025, Stantec personnel oversaw soil vapor sampling of the newly-installed soil vapor probes at the Site. Soil vapor sampling was performed by A&R Laboratories (ARL), and analyzed on-site in a mobile laboratory. Soil boring SV-2 was submerged in water due to irrigation and no sample could be collected.

Soils encountered during this investigation generally consisted of silt and clay with sand to the maximum explored depth of 5.5 feet below ground surface (bgs). PID readings were measured at 0.0 parts per million by volume (ppmV) at all locations. No olfactory response, staining, or odors were observed in any borings advanced during this investigation.

Laboratory analytical test results from this assessment are attached as Appendix A. A summary of the analytical data from this assessment is provided below:
• Soil Vapor: There were no detections of any volatile organic compounds (VOCs) above their respective laboratory reporting limits in the two soil vapor samples collected during this assessment (i.e. “non-detect”).

Given there were no detections of VOCs above their corresponding laboratory reporting limits, the off-site west-adjoining fuel station does not present a VEC to the Subject Property. No further assessment appears to be warranted.
1769
Phase II Environmental Site Assessment
Limitations
Project: 185806577 1
1 Introduction
Stantec Consulting Services, Inc. (Stantec) has performed a Phase II Environmental Site Assessment (ESA) of the property located at 35 15 Argonaut, Aliso Viejo, Orange County, California (the “Subject Property” Figure 1), on behalf of Brandywine Homes (the “Client”). The work was performed according to the requirements of the Master Services Agreement between Brandywine Homes and Stantec (the “MSA").

1.1 Property Description and Operations
The Subject Property consists of approximately 4.35 acres of land associated with Assessor’s Parcel Numbers (APNs) 623-093-10 and 623-093-11, and the address of 15 Argonaut, Aliso Viejo, Orange County, California. According to records obtained through Environmental Data Resources (EDR), the Subject Property appears to have been vacant from at least the 1930s to 1980s and was commercially developed with one structure and asphalt parking lot by 1989 in its present-day configuration. The Subject Property building is currently vacant. The adjoining properties and vicinity are developed with commercial/light industrial businesses and residential properties. A Subject Property Location Map is provided as Figure 1. A Subject Property Vicinity Map illustrating the main features of the Subject Property and vicinity is provided as Figure 2.

1.1.1 Site Geology and Hydrogeology
According to a previous environmental site assessment for the Subject Property by EMG in 2016, the general geology of the Subject Property and vicinity is comprised of sandstone, mudstone, siltstone, evaporite and conglomerate, dating from the Oligocene to the Pliocene epochs (EMG, 2016).

According to California DOC Earthquake Zone Map (Department of Conservation Map Server (ca.gov)), the Subject Property is not located within an Alquist-Priolo (AP) Earthquake Fault Zone boundary. The closest fault zone is located approximately 20 miles to the northwest of the Subject Property. The Subject Property lies within a Landslide Zone.

The Subject Property lies within the Aliso Creek Watershed located in southern Orange County. The Watershed is part of the Laguna subunit of the San Juan Hydrologic Basin. The Basin is comprised of coastal watersheds which drain to the Pacific Ocean. The Aliso Creek Watershed drains approximately 30 square miles and has limited water-bearing formations, which include two alluvial aquifers and one deeper aquifer. The alluvial aquifers are separated by a shale formation. Groundwater extraction is limited within this area due to saltwater intrusion (Orange County, 2018).

Site specific groundwater investigations were not conducted during this ESA; however, according to a 2022 Second Half Groundwater Monitoring Report for a release site located approximately one mile to the north, groundwater in the vicinity is estimated to be approximately 7.19-15.64 feet below top of well casing (btoc) with a flow direction generally to the east. 1770
Phase II Environmental Site Assessment
Limitations
Project: 185806577 2

1.2 Background
The following potential vapor encroachment condition (pVEC) and recognized environmental condition (REC) were identified during the Phase I ESA completed for Subject Property dated July 14, 2025:
• A west-adjoining fuel station located at 23022 Aliso Creek Road is listed as a gasoline service station since 1996 that reportedly houses three active underground storage tanks (USTs) installed between 2004 and 2016. The USTs range from 10,000 to 20,000 gallons in size and contain diesel, regular and premium unleaded fuel. A minor spill of two gallons of fuel was reported in 2018 due to a vehicle overfill onto concrete. The spill was cleaned by onsite personnel. The site received permit-related violations between 2014 and 2016 which were returned to compliance. No releases are reported at the site. Given the proximity of the fuel station to the Subject Property, and no documented assessment of soil, soil vapor, or groundwater at the site, as well as inferred groundwater flow to the east, this site represents a potential VEC and is considered a REC for the Subject Property. 1771
Phase II Environmental Site Assessment
Limitations
Project: 185806577 1
2 Field Investigation
All work was conducted under the direct supervision of a State of California professional geologist.

Stantec provided the services of a field geologist to supervise and direct all on-site activities performed during this investigation, which included the following:
• Stantec obtained an Underground Service Alert (USA) ticket number prior to commencement of drilling activities. Additionally, Stantec subcontracted a private utility locator to clear all proposed boring locations.
• On August 26, 2025, Stantec personnel oversaw the advancement of three (3) soil vapor borings (SV-1 through SV-3) to 5-feet below ground surface (bgs) on the Subject Property. • On August 28, 2025, Stantec personnel oversaw soil vapor sampling of the newly-installed soil vapor probes at the Site. Soil vapor sampling was performed by A&R Laboratories (ARL), and analyzed on-site in a mobile laboratory. Soil boring SV-2 was submerged in water due to irrigation and no sample could be collected.

All boring locations advanced during this investigation are depicted on Figure 2.

2.1 Pre-Field Activities
In accordance with federal Occupational Safety and Health Administration (OSHA) regulations (29 CFR, Section 1910.120), Stantec developed a site-specific Health and Safety Plan (HASP) for the Property. All Stantec personnel and subcontractors associated with the project were required to be familiar with and comply with all provisions of the HASP.

Stantec visited the Property to mark the proposed boring locations. Subsequent to the marking, underground service alert (USA) was notified at least 72-hours prior to the commencement of drilling activities.

2.2 Investigation
All soil and soil vapor borings were advanced using a hand auger to a maximum explored depth of 5.5 feet below ground surface (bgs). Soil vapor samples were collected to assess for the presence of VOCs.

Boring locations are depicted on Figure 2.

2.2.1 Soil Boring and Sampling Protocols
All locations were cleared of belowground utilities by clearing the top 5.5 feet of soil using a hand auger.

The soils from each of the direct push borings were visually examined by Stantec field personnel who classified the soils in accordance with the Unified Soil Classification System (USCS). A photo-ionization detector (PID) was used to monitor/field screen the soils collected. Field screening for VOCs was 1772
Phase II Environmental Site Assessment
Limitations
Project: 185806577 2
achieved by removing the soil from the uppermost sample sleeve and placing it in a zip-lock type baggie.

A PID probe was inserted into the baggie to monitor the headspace for VOC vapors.

Following classification and VOC vapor evaluation, the soil samples were carefully packaged for chemical analysis by sealing the ends of the acetate liner with Teflon ® sheeting, covering with plastic end caps, and sealing with non-VOC containing tape. The sample containers were labeled with the appropriate identification information (boring number, sample depth, sample collection date, and sample collection time). The samples were logged on a chain-of-custody form and delivered to a state certified laboratory for analysis. Laboratory analysis is discussed in Section 3.0.

2.2.2 Soil Vapor Probe Installation
At the completion of drilling to the target depths, select soil borings were converted to soil vapor monitoring points at the five-foot depth interval. Subsurface soil vapor probe installation was performed in accordance with the July 2015 DTSC “Advisory - Active Soil Gas Investigations” (DTSC Advisory).

Each sample probe was constructed with a 1-inch-long Airstone sampling screen set at the prescribed sampling intervals. Each of the sampling screens was constructed with a permeable Airstone vapor tip connected to ¼-inch outer diameter Nylaflow tubing that was lowered to the bottom of the borehole and backfilled with filter sand, until approximately 12-inches of filter pack was placed. A transition seal consisting of approximately 12-inches of dry bentonite was then placed above the filter pack, followed by an annular seal consisting of hydrated bentonite until the next sampling interval was reached. The sequence was then repeated to install the second monitoring point, and/ or completely backfill the borehole.

At the surface, the exposed nylon tubing was capped with tight fitting plastic endcaps and labeled to indicate sampling depth. After installation of the soil vapor sample probes, subsurface conditions were allowed to equilibrate a minimum of 48-hours prior to leak testing and sample collection on August 28, 2025.

2.2.3 Soil Vapor Sampling
Soil vapor samples were collected on August 28, 2025, in accordance with the methods and procedures outlined by the DTSC Advisory, a minimum of 48-hours after installation, in order to allow for equilibration.

Prior to sampling, a shut-in test was conducted on the sampling train to ensure all connections and fittings were airtight. The shut-in test was performed on the sampling train by applying a vacuum of 100 inches of water to the sampling train and monitoring magnehelic gauges for a pressure drop for one minute. If loss of vacuum was observed, the fittings were adjusted as needed until no vacuum loss was observed during subsequent shut-in tests.

After the sampling equipment passed the shut-in test, the probes were purged using an air pump outfitted with a low-flow module to remove internal air from the sample train (calculated from the internal volume of the tubing and probe tip); the void space of the sand pack around the probe tip; and the void space of the dry bentonite (in the annular space). Three internal volumes were purged from each sampling location at a rate less than 200 milliliters per minute (ml/min).
1773
Phase II Environmental Site Assessment
Limitations
Project: 185806577 3
Immediately following purging the internal volumes, the soil vapor samples were collected by the soil vapor sampling technician into pre-cleaned glass syringes at a rate of 200 ml/min. A tracer compound of was placed above the surface seal and along the sampling train to evaluate the integrity of the seal. No tracer compounds were detected in the soil vapor samples collected during this investigation. The soil vapor samples were transported to the on-site mobile laboratory and analyzed within 30 minutes of sample collection.

2.2.4 Field Equipment Cleaning Procedures
To maintain quality control during drilling operations, all drill rods and reusable soil sampling equipment was decontaminated using a triple bucket rinse. Prior to drilling at a given location or sampling interval, all equipment coming in direct contact with soil samples was scrubbed with an Alconox scrub solution followed by a clean tap water rinse and then a final distilled water rinse. The disposable acetate soil sample liners were used for one sampling interval and then discarded. 1774
Phase II Environmental Site Assessment
Limitations
Project: 185806577 4
3 Laboratory Testing Program
Soil vapor samples collected during this investigation were delivered under COC to the on-site mobile laboratory operated by A&R Laboratories (ARL), based in Ontario, California. All soil vapor samples were analyzed for VOCs USEPA test method 8260 by the on-site mobile laboratory.

ARL are certified to perform hazardous waste testing by the California State Water Resources Control Board Environmental Laboratory Accreditation Program (ELAP).

Complete laboratory analytical results are presented on the laboratory data sheets attached as Appendix A.
1775
Phase II Environmental Site Assessment
Limitations
Project: 185806577 5
4 Investigation Results

4.1 Field Observations
Stantec personnel oversaw a geophysical subsurface survey to clear all locations before ground disturbance. No utility conflicts were identified at proposed boring locations.

Soils encountered during this investigation consisted of sand with silt and clay with sand to the maximum explored depth of 5.5 feet bgs. PID readings were measured at 0.0 parts per million by volume (ppmV) at all locations. No olfactory response, staining, or odors were observed in any borings advanced during this investigation. All borings locations are shown on Figure 2.

4.2 Analytical Results
The laboratory test results from this investigation are discussed below and were compared to the DTSC Human and Ecologic Risk Office (HERO), Note Number 3, Modified Indoor Air Screening Level (MIASL) using an attenuation factor (AF) of 0.03. Given the Subject Property is contemplated as a future residential community, residential-use screening criteria were used for evaluation of the analytical data collected during this investigation.

Laboratory analytical test results from this assessment are attached as Appendix A.

4.2.1 Soil Vapor Results
Soil boring SV-2 was submerged in water due to irrigation and no sample could be collected. There were no detections of any VOCs above their respective laboratory reporting limits in the two soil vapor samples collected during this assessment (i.e. “non-detect”).
1776
Phase II Environmental Site Assessment
Limitations
Project: 185806577 6
5 Discussion and Recommendations
Stantec has completed an evaluation of subsurface conditions on the Subject Property.

Given there were no detections of VOCs above their corresponding laboratory reporting limits, the off-site west-adjoining fuel station does not present a VEC to the Subject Property. No further assessment appears to be warranted.
1777
Phase II Environmental Site Assessment
Limitations
Project: 185806577 7
6 Limitations
The conclusions presented in this report are professional opinions based on data described in this report, and those data presented by prior investigations performed by others. The opinions of this report have been arrived at in accordance with currently accepted hydrogeologic and engineering standards and practices applicable to this location and are subject to the following inherent limitations. Stantec makes no other warranty, either expressed or implied, concerning the conclusions and professional advice that is contained within the body of this report.

Inherent in most projects performed in a heterogeneous subsurface environment, continuing excavation and assessments may reveal findings that are different than those presented herein. This facet of the environmental profession should be considered when formulating professional opinions on the limited data collected on these projects.

This report has been issued with the clear understanding that it is the responsibility of the owner, or their representative, to make appropriate notifications to regulatory agencies. It is specifically not the responsibility of Stantec to conduct appropriate notifications as specified by current County and State regulations.

The information presented in this report is valid as of the date our exploration was performed. Site conditions may degrade with time; consequently, the findings presented herein are subject to change.

In the event of any conflict between the terms and conditions of this report and the terms and conditions of the MSA, the MSA shall control.
1778
Phase II Environmental Site Assessment
Project: 185806577
Figures
1779
NOTE: THIS DRAWING ILLUSTRATES SUPPORTING INFORMATION SPECIFIC TO A STANTEC SERVICES INC. REPORT AND MUST NOT BE USED FOR OTHER PURPOSES. 185807004
1 AS SHOWN
25/07/17
CD
KE

SUBJECT PROPERTY LOCATION MAP

PHASE I ENVIRONMENTAL SITE ASSESSMENT
15 ARGONAUT, ALISO VIEJO, CALIFORNIA 92656

BRANDYWINE HOMES
© 2025
OK
SC2025070028
0 2500
SCALE : AS SHOWN
5000 7500 ft

SUBJECT PROPERTY
1780
NOTE: THIS DRAWING ILLUSTRATES SUPPORTING INFORMATION SPECIFIC TO A STANTEC CONSULTING LTD. REPORT AND MUST NOT BE USED FOR OTHER PURPOSES. 185807004
2 AS SHOWN
25/07/17
CS
KE

SUBJECT PROPERTY DETAILS

PHASE I ENVIRONMENTAL SITE ASSESSMENT
15 ARGONAUT, ALISO VIEJO, CALIFORNIA 92656
BRANDYWINE HOMES © 2025
OK
SC2025070029

CITY PARK

TRANSFORMER
TRASH

ENCLOSURES

CHEVRON

GAS STATION

GLENWOOD

ALISO CREEK

AUTO REPAIR

FACILITY

COMMERCIAL

COMMERCIAL

COMMERCIAL

RESIDENTIAL

RESIDENTIAL

HVAC UNITS
LEGEND

SUBJECT PROPERTY

BOUNDARY
SCALE : AS SHOWN
0 100 200 300FT
1781
Phase II Environmental Site Assessment
Project: 185806577
Appendices
1782
Phase II Environmental Site Assessment
Project: 185806577
Appendix A Laboratory Data Sheets
1783
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 1 of 10 ends

CASE NARRATIVE
Authorized Signature Name / Title (print) Ken Zheng, President Signature / Date Ken Zheng, President
09/02/2025 12:12:43
Laboratory Job No. (Certificate of Analysis No.) 2508-00288 Project Name / No. 15 Argonaut Aliso Viejo, CA 92656 185807004 Dates Sampled (from/to) 08/28/25 To 08/28/25
Dates Received (from/to) 08/28/25 To 08/28/25
Dates Reported (from/to) 09/02/25 To 9/2/2025
Chains of Custody Received Yes
Comments:

Subcontracting
Organic Analyses
No analyses sub-contracted
Sample Condition(s)
All samples intact
The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1784 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 2 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 001 SV-1-5' Date & Time Sampled: 08/28/25 @ 7:45 Sample Matrix: Air
Purge Volume Sampled: 3
[Fixed Gases]
Oxygen 18.2 0.25 0.50 % ASTM D-1946 08/28/25 KZ
[VOCs by GCMS]
Acetone <0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Benzene <0.0031 0.00312 0.013 µg/L <3.1 3.1 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromochloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromodichloromethane <0.0026 0.0026 0.010 µg/L <2.6 2.6 10 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromoform <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromomethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Butanone (MEK) <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG n-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG sec-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG tert-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Carbon Disulfide <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG Carbon Tetrachloride <0.0033 0.00325 0.0065 µg/L <3.3 3.3 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloroform <0.0026 0.0026 0.0052 µg/L <2.6 2.6 5 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Chlorotoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Chlorotoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dibromochloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dibromoethane (EDB) <0.0013 0.0013 0.013 µg/L <1.3 1.3 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dibromo-3-
Chloropropane
<0.0013 0.0013 0.013 µg/L <1.3 1.3 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dibromomethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,4-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dichlorodifluoromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1785 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 3 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 001 SV-1-5' Date & Time Sampled: 08/28/25 @ 7:45 Sample Matrix: Air
Purge Volume Sampled: 3
.....continued
1,1-Dichloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichloroethane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG cis-1,2-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG trans-1,2-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2,2-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG cis-1,3-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG trans-1,3-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Ethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Hexachlorobutadiene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Hexanone <0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Isopropylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Isopropyltoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Methylene Chloride <0.0065 0.0065 0.01 µg/L <6.5 6.5 10 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Methyl-2-Pentanone
(MIBK)
<0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Methyl-t-butyl Ether (MtBE) <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Naphthalene <0.0026 0.0026 0.0065 µg/L <2.6 2.6 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG n-Propylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Styrene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,1,2-Tetrachloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,2,2-Tetrachloroethane <0.0016 0.00156 0.013 µg/L <1.6 1.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Tetrachloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Toluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,3-Trichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,4-Trichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,1-Trichloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,2-Trichloroethane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1786 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 4 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 001 SV-1-5' Date & Time Sampled: 08/28/25 @ 7:45 Sample Matrix: Air
Purge Volume Sampled: 3
.....continued
Trichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,3-Trichloropropane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichlorofluoromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichlorotrifluoroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,4-Trimethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3,5-Trimethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Vinyl Chloride <0.0003 0.000312 0.0065 µg/L <0.3 0.3 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG m,p-Xylenes <0.0130 0.013 0.026 µg/L <13.0 13.0 26 µg/m3 0.13 EPA 8260B 08/28/25 JRG o-Xylene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG [VOC Vapor Sampling
Tracer] Isopropanol (IPA) <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG [VOC Surrogates]
Dibromofluoromethane 80 70-130 %REC EPA 8260B 08/28/25 JRG Toluene-D8 106 70-130 %REC EPA 8260B 08/28/25 JRG
Bromofluorobenzene 82 70-130 %REC EPA 8260B 08/28/25 JRG Sample: 002 SV-3-5' Date & Time Sampled: 08/28/25 @ 8:30 Sample Matrix: Air
Purge Volume Sampled: 3
[Fixed Gases]
Oxygen 20.3 0.25 0.50 % ASTM D-1946 08/28/25 KZ
[VOCs by GCMS]
Acetone <0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Benzene <0.0031 0.00312 0.013 µg/L <3.1 3.1 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromochloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromodichloromethane <0.0026 0.0026 0.010 µg/L <2.6 2.6 10 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromoform <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromomethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Butanone (MEK) <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1787 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 5 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 002 SV-3-5' Date & Time Sampled: 08/28/25 @ 8:30 Sample Matrix: Air
Purge Volume Sampled: 3
.....continued
n-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG sec-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG tert-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Carbon Disulfide <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG Carbon Tetrachloride <0.0033 0.00325 0.0065 µg/L <3.3 3.3 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloroform <0.0026 0.0026 0.0052 µg/L <2.6 2.6 5 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Chlorotoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Chlorotoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dibromochloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dibromoethane (EDB) <0.0013 0.0013 0.013 µg/L <1.3 1.3 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dibromo-3-
Chloropropane
<0.0013 0.0013 0.013 µg/L <1.3 1.3 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dibromomethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,4-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dichlorodifluoromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichloroethane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG cis-1,2-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG trans-1,2-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2,2-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG cis-1,3-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG trans-1,3-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1788 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 6 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 002 SV-3-5' Date & Time Sampled: 08/28/25 @ 8:30 Sample Matrix: Air
Purge Volume Sampled: 3
.....continued
Ethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Hexachlorobutadiene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Hexanone <0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Isopropylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Isopropyltoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Methylene Chloride <0.0065 0.0065 0.01 µg/L <6.5 6.5 10 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Methyl-2-Pentanone
(MIBK)
<0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Methyl-t-butyl Ether (MtBE) <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Naphthalene <0.0026 0.0026 0.0065 µg/L <2.6 2.6 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG n-Propylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Styrene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,1,2-Tetrachloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,2,2-Tetrachloroethane <0.0016 0.00156 0.013 µg/L <1.6 1.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Tetrachloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Toluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,3-Trichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,4-Trichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,1-Trichloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,2-Trichloroethane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,3-Trichloropropane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichlorofluoromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichlorotrifluoroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,4-Trimethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3,5-Trimethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Vinyl Chloride <0.0003 0.000312 0.0065 µg/L <0.3 0.3 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG m,p-Xylenes <0.0130 0.013 0.026 µg/L <13.0 13.0 26 µg/m3 0.13 EPA 8260B 08/28/25 JRG o-Xylene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG [VOC Vapor Sampling
Tracer] Isopropanol (IPA) <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1789 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 7 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 002 SV-3-5' Date & Time Sampled: 08/28/25 @ 8:30 Sample Matrix: Air
Purge Volume Sampled: 3
.....continued
[VOC Surrogates]
Dibromofluoromethane 82 70-130 %REC EPA 8260B 08/28/25 JRG Toluene-D8 106 70-130 %REC EPA 8260B 08/28/25 JRG
Bromofluorobenzene 82 70-130 %REC EPA 8260B 08/28/25 JRG Sample: 003 SV-3-5-DUP Date & Time Sampled: 08/28/25 @ 8:30 Sample Matrix: Air
Purge Volume Sampled: 3
[Fixed Gases]
Oxygen 19.1 0.25 0.50 % ASTM D-1946 08/28/25 KZ
[VOCs by GCMS]
Acetone <0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Benzene <0.0031 0.00312 0.013 µg/L <3.1 3.1 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromochloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromodichloromethane <0.0026 0.0026 0.010 µg/L <2.6 2.6 10 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromoform <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Bromomethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Butanone (MEK) <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG n-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG sec-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG tert-Butylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Carbon Disulfide <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG Carbon Tetrachloride <0.0033 0.00325 0.0065 µg/L <3.3 3.3 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloroform <0.0026 0.0026 0.0052 µg/L <2.6 2.6 5 µg/m3 0.13 EPA 8260B 08/28/25 JRG Chloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Chlorotoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Chlorotoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1790 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 8 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 003 SV-3-5-DUP Date & Time Sampled: 08/28/25 @ 8:30 Sample Matrix: Air
Purge Volume Sampled: 3
.....continued
Dibromochloromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dibromoethane (EDB) <0.0013 0.0013 0.013 µg/L <1.3 1.3 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dibromo-3-
Chloropropane
<0.0013 0.0013 0.013 µg/L <1.3 1.3 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dibromomethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,4-Dichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Dichlorodifluoromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichloroethane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG cis-1,2-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG trans-1,2-Dichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2,2-Dichloropropane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG cis-1,3-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG trans-1,3-Dichloropropene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Ethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Hexachlorobutadiene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 2-Hexanone <0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Isopropylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Isopropyltoluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Methylene Chloride <0.0065 0.0065 0.01 µg/L <6.5 6.5 10 µg/m3 0.13 EPA 8260B 08/28/25 JRG 4-Methyl-2-Pentanone
(MIBK)
<0.0650 0.065 0.13 µg/L <65.0 65.0 130 µg/m3 0.13 EPA 8260B 08/28/25 JRG Methyl-t-butyl Ether (MtBE) <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Naphthalene <0.0026 0.0026 0.0065 µg/L <2.6 2.6 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG n-Propylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Styrene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1791 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 9 of 10 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
6248
1003
185807004
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
Analysis Result Method Date
09/02/25
08/28/25
MDL RL Units Result MDL RL Units Qual DF Tech
STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Sample: 003 SV-3-5-DUP Date & Time Sampled: 08/28/25 @ 8:30 Sample Matrix: Air
Purge Volume Sampled: 3
.....continued
1,1,1,2-Tetrachloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,2,2-Tetrachloroethane <0.0016 0.00156 0.013 µg/L <1.6 1.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Tetrachloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Toluene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,3-Trichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,4-Trichlorobenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,1-Trichloroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,1,2-Trichloroethane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichloroethene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,3-Trichloropropane <0.0026 0.0026 0.013 µg/L <2.6 2.6 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichlorofluoromethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Trichlorotrifluoroethane <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,2,4-Trimethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG 1,3,5-Trimethylbenzene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG Vinyl Chloride <0.0003 0.000312 0.0065 µg/L <0.3 0.3 7 µg/m3 0.13 EPA 8260B 08/28/25 JRG m,p-Xylenes <0.0130 0.013 0.026 µg/L <13.0 13.0 26 µg/m3 0.13 EPA 8260B 08/28/25 JRG o-Xylene <0.0065 0.0065 0.013 µg/L <6.5 6.5 13 µg/m3 0.13 EPA 8260B 08/28/25 JRG [VOC Vapor Sampling
Tracer] Isopropanol (IPA) <0.0325 0.0325 0.07 µg/L <32.5 32.5 70 µg/m3 0.13 EPA 8260B 08/28/25 JRG [VOC Surrogates]
Dibromofluoromethane 82 70-130 %REC EPA 8260B 08/28/25 JRG Toluene-D8 90 70-130 %REC EPA 8260B 08/28/25 JRG
Bromofluorobenzene 87 70-130 %REC EPA 8260B 08/28/25 JRG Respectfully Submitted:

Ken Zheng - President
The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1792 909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 10 of 10 ends

QUALIFIERS
B = Detected in the associated Method Blank at a concentration above the routine RL B1= BOD blank is over specifications . The reported result may be biased high.

D = Surrogate recoveries are not calculated due to sample dilution E = Estimated value
H = Analyte was prepared and/or analyzed outside of the analytical method holding time I = Matrix Interference
J = Analyte concentration detected between RL and MDL

ABBREVIATIONS
DF = Dilution Factor
RL = Reporting Limit
MDL = Method Detection Limit
Qual = Qualifier
Tech = Technician
The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1793 CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTAIRO, CA 91761
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

QUALITY CONTROL DATA REPORT

Page 1 of 3 ends

STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
735 E. CARNEGIE DR., STE. 280
SAN BERNARDINO, CA 92408
Date Reported
Date Received
Invoice No.

Customer #
Date Sampled
6248
1003
08/28/2025
Customer P.O.
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
09/02/2025
08/28/2025
185807004
Method # EPA 8260B QC Reference # 124497 Date Analyzed: 8/28/2025 Technician: JRG Samples 001 002 003 Results LCS %REC LCS %DUP LCS %RPD BLKSRR%
REC
1,1-Dichloroethene 93 103 10.7 Benzene 110 105 4.1 Bromofluorobenzene 74 Chlorobenzene 94 118 22.5 Dibromofluoromethan 92 Toluene 91 112 20.1 Toluene-D8 130 Trichloroethene 86 103 18.3 Control Ranges
LCS %REC LCS %RPD BLKSRR%REC
70 - 130 0 - 25
70 - 130 0 - 25
50 - 150
70 - 130 0 - 25
50 - 150
70 - 130 0 - 25
50 - 150
70 - 130 0 - 25
1794
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTAIRO, CA 91761
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

QUALITY CONTROL DATA REPORT

Page 2 of 3 ends

STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
Date Reported
Date Received
Date Sampled 08/28/2025
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
09/02/2025
08/28/2025
Method blank results
Ref Test Name Result Qualif Units MDL Ref Test Name Result Qualif Units MDL 124497 Acetone <0.0650 µg/L 0.0650 Benzene <0.0031 µg/L 0.0031 Bromobenzene <0.0065 µg/L 0.0065 Bromochloromethane <0.0065 µg/L 0.0065 Bromodichloromethane <0.0026 µg/L 0.0026 Bromoform <0.0065 µg/L 0.0065 Bromomethane <0.0065 µg/L 0.0065 2-Butanone (MEK) <0.0325 µg/L 0.0325 n-Butylbenzene <0.0065 µg/L 0.0065 sec-Butylbenzene <0.0065 µg/L 0.0065
tert-Butylbenzene <0.0065 µg/L 0.0065 Carbon Disulfide <0.0325 µg/L 0.0325 Carbon Tetrachloride <0.0033 µg/L 0.0033 Chlorobenzene <0.0065 µg/L 0.0065 Chloroethane <0.0065 µg/L 0.0065 Chloroform <0.0026 µg/L 0.0026 Chloromethane <0.0065 µg/L 0.0065 2-Chlorotoluene <0.0065 µg/L 0.0065
4-Chlorotoluene <0.0065 µg/L 0.0065 Dibromochloromethane <0.0065 µg/L 0.0065 1,2-Dibromoethane (EDB) <0.0013 µg/L 0.0013
1,2-Dibromo-3-Chloropropane <0.0013 µg/L 0.0013 Dibromomethane <0.0065 µg/L 0.0065 1,2-Dichlorobenzene <0.0065 µg/L 0.0065
1,3-Dichlorobenzene <0.0065 µg/L 0.0065
1,4-Dichlorobenzene <0.0065 µg/L 0.0065 Dichlorodifluoromethane <0.0065 µg/L 0.0065 1,1-Dichloroethane <0.0065 µg/L 0.0065
1,2-Dichloroethane <0.0026 µg/L 0.0026
1,1-Dichloroethene <0.0065 µg/L 0.0065
cis-1,2-Dichloroethene <0.0065 µg/L 0.0065
trans-1,2-Dichloroethene <0.0065 µg/L 0.0065
1,2-Dichloropropane <0.0065 µg/L 0.0065
1,3-Dichloropropane <0.0065 µg/L 0.0065
2,2-Dichloropropane <0.0065 µg/L 0.0065
1,1-Dichloropropene <0.0065 µg/L 0.0065
cis-1,3-Dichloropropene <0.0065 µg/L 0.0065
trans-1,3-Dichloropropene <0.0065 µg/L 0.0065 Ethylbenzene <0.0065 µg/L 0.0065 Hexachlorobutadiene <0.0065 µg/L 0.0065 2-Hexanone <0.0650 µg/L 0.0650
Isopropylbenzene <0.0065 µg/L 0.0065
4-Isopropyltoluene <0.0065 µg/L 0.0065 Methylene Chloride <0.0065 µg/L 0.0065 4-Methyl-2-Pentanone (MIBK) <0.0650 µg/L 0.0650
Methyl-t-butyl Ether (MtBE) <0.0065 µg/L 0.0065 Naphthalene <0.0026 µg/L 0.0026 n-Propylbenzene <0.0065 µg/L 0.0065 Styrene <0.0065 µg/L 0.0065 1,1,1,2-Tetrachloroethane <0.0065 µg/L 0.0065
1,1,2,2-Tetrachloroethane <0.0016 µg/L 0.0016 Tetrachloroethene <0.0065 µg/L 0.0065 Toluene <0.0065 µg/L 0.0065 1,2,3-Trichlorobenzene <0.0065 µg/L 0.0065
1,2,4-Trichlorobenzene <0.0065 µg/L 0.0065
1,1,1-Trichloroethane <0.0065 µg/L 0.0065
1,1,2-Trichloroethane <0.0026 µg/L 0.0026 Trichloroethene <0.0065 µg/L 0.0065 1,2,3-Trichloropropane <0.0026 µg/L 0.0026 Trichlorofluoromethane <0.0065 µg/L 0.0065 Trichlorotrifluoroethane <0.0065 µg/L 0.0065 1,2,4-Trimethylbenzene <0.0065 µg/L 0.0065
1,3,5-Trimethylbenzene <0.0065 µg/L 0.0065 Vinyl Chloride <0.0003 µg/L 0.0003 m,p-Xylenes <0.0130 µg/L 0.0130 o-Xylene <0.0065 µg/L 0.0065
Isopropanol (IPA) <0.0325 µg/L 0.0325
1795
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTAIRO, CA 91761
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

QUALITY CONTROL DATA REPORT

Page 3 of 3 ends

STANTEC CONSULTING SVCS., INC.

ALICIA JANSEN
Date Reported
Date Received
Date Sampled 08/28/2025
2508-00288
Project: 15 Argonaut Aliso Viejo, CA 92656
09/02/2025
08/28/2025
Respectfully Submitted: Ken Zheng - President
1796
1797
Stantec is a global leader in sustainable
engineering, architecture, and environmental
consulting. The diverse perspectives of our
partners and interested parties drive us to
think beyond what’s previously been done on
critical issues like climate change, digital
transformation, and future-proofing our cities
and infrastructure. We innovate at the
intersection of community, creativity, and
client relationships to advance communities
everywhere, so that together we can redefine
what’s possible.
1798
FCS
Appendix F:

Hydrology and Water Quality Supporting
Information
•• • FCS
An ADEC Innovation
1799

THIS PAGE INTENTIONALLY LEFT BLANK
1800
FCS
F.1 - Water Quality Management Plan
•• • FCS
An ADEC Innovation
1801

THIS PAGE INTENTIONALLY LEFT BLANK
1802
Preliminary Water Quality
Management Plan
(WQMP)
Project Name:

Presidio
15 Argonaut
Aliso Viejo, CA 92656
Prepared for:

Brandywine Homes
2355 Main Street, Suite 220
Irvine, CA 92614
Prepared by:

Advanced Civil Group, Inc.

Engineer: R. Steven Austin, PE
Registration No. 68795
30251 Golden Lantern, Suite E PMB 251
Laguna Niguel, CA 92677
(866) 338-5778
Engineer’s Seal
Prepared on:

April 7, 2026
Revised on:

May 28, 2026
Revised on:

July 8, 2026
1803
Water Quality Management Plan (WQMP)
Presidio Owner’s Certification
Project Owner’s Certification
Permit/Application No. Grading Permit No.

Tract/Parcel Map No. Tract No. 19489 Building Permit No.

CUP, SUP, and/or APN (Specify Lot Numbers if Portions of Tract) 623-093-10 and 623- 093-11
This Water Quality Management Plan (WQMP) has been prepared for Presidio by Advanced Civil Group, Inc. The WQMP is intended to comply with the requirements of the local NPDES Stormwater Program requiring the preparation of the plan.

The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan and will ensure that this plan is amended as appropriate to reflect up-to-date conditions on the site consistent with the current Orange County Drainage Area Management Plan (DAMP) and the intent of the non-point source NPDES Permit for Waste Discharge Requirements for the County of Orange, Orange County Flood Control District and the incorporated Cities of Orange County within the San Diego Region (South Orange County).

Once the undersigned transfers its interest in the property, its successors-in-interest shall bear the aforementioned responsibility to implement and amend the WQMP. An appropriate number of approved and signed copies of this document shall be available on the subject site in perpetuity.

Owner: Emanual Robinson
Title Owner’s Representative
Company
Address 2355 Main Street, Suite 220, Irvine, CA 92614
Email [email protected]
Telephone # 925-389-8632
Signature Date I I
1804
Water Quality Management Plan (WQMP)
Presidio Owner’s Certification
Contents Page No.

Section 1 Discretionary Permit(s) and Water Quality Conditions ...................... 3 Section 2 Project Description ........................................................................... 4

2.1 General Description ............................................................................ 4

2.2 Post Development Drainage Characteristics .................................... 5

2.3 Property Ownership/Management .................................................... 5 Section 3 Site & Watershed Characterization ................................................... 6

3.1 Site Conditions .................................................................................... 6

3.1.1 Existing Site Conditions ...................................................................................... 6

3.1.2 Infiltration-Related Characteristics ................................................................... 6

3.2 Proposed Site Development Activities .............................................. 7

3.2.1 Overview of Site Development Activities ..................................................... 7

3.2.2 Project Attributes Influencing Stormwater Management.......................... 7

3.2.3 Effects on Infiltration and Harvest and Use Feasibility ............................. 8

3.3 Receiving Waterbodies ....................................................................... 8

3.4 Stormwater Pollutants or Conditions of Concern ........................... 8

3.5 Hydrologic Conditions of Concern ..................................................... 9

3.6 Critical Course Sediment Yield Areas ............................................... 11 Section 4 Site Plan and Drainage Plan ............................................................ 12

4.1 Drainage Management Area Delineation ........................................ 12

4.2 Overall Site Design BMPs .................................................................. 12

4.3 DMA Characteristics and Site Design BMPs .................................... 12

4.3.1 DMA 1............................................................................................................ 12

4.3.3 DMA Summary ............................................................................................ 13

4.4 Source Control BMPs ......................................................................... 13 Section 5 Low Impact Development BMPs ..................................................... 16

5.1 LID BMPs ............................................................................................. 16

5.1.1 Hydrologic Source Controls ............................................................................... 16

5.1.2 Structural LID BMP for DMA 1 ......................................................................... 17

5.2 Summary of LID BMPs ....................................................................... 17 Section 6 Hydromodification BMPs ................................................................ 19

6.1 Points of Compliance ......................................................................... 19

6.2 Pre-Development (Natural) Conditions .......................................... 19

6.3 Post-Development Conditions and Hydromodification BMPs ...... 19

6.4 Measures for Avoidance of Critical Coarse Sediment Yield Areas 19

6.5 Hydrologic Modeling and Hydromodification Compliance ............ 19 Section 7 Educational Materials Index ........................................................... 20 Attachment A: EDUCATIONAL MATERIALS ........................................................... 21 Attachment B: CALCULATIONS AND EXHIBITS ...................................................... 22 1805
Water Quality Management Plan (WQMP)
Presidio Section I

Page 4 ends

Attachment C: HARVEST AND REUSE DETERMINATION ........................................ 23 Attachment D: OPERATIONS AND MAINTENANCE PLAN ....................................... 24 Attachment E: GEOTECHNICAL REPORT................................................................ 25 Attachment F: HYDROMODIFICATION CALCULATIONS ......................................... 26 Attachment G: DRAINAGE REPORT ...................................................................... 27 Attachment H: MAINTENANCE COVENANT AND AGREEMENT .............................. 28 1806
Water Quality Management Plan (WQMP)

Presidio Section 1

Page 3 ends

Section 1 Discretionary Permit(s) and Water
Quality Conditions
Project Infomation
Permit/Application No.

Site Address or
Tract/Parcel Map
No.
15 Argonaut, Aliso
Viejo, CA 92656
Additional Information/
Comments:
58 unit townhome development
Water Quality Conditions
Water Quality
Conditions from prior
approvals or applicable
watershed-based plans
None
1807
Water Quality Management Plan (WQMP)
Presidio Section 2

Page 4 ends

Section 2 Project Description

2.1 General Description
Description of Proposed Project
Site Location
15 Argonaut, Aliso Viejo, CA 92656
Project Area (ft2) 137,650 Number of Dwelling Units: 58 SIC Code: NA Narrative Project
Description:

The project site is located at 15 Argonaut, Aliso Viejo, CA 92656.

The project consists of 58 townhomes with associated drive aisles, sidewalks, parking, and landscaping. The north and west boundaries feature a 2:1 slope where v-ditches intercept undeveloped run-on and divert it through the site for untreated discharge into Argonaut. Because the development creates 48,700 square feet of impervious surface— exceeding the 10,000-square-foot threshold—it is classified as a Priority Project, requiring permanent Best Management Practices (BMPs) and water quality treatment for all onsite runoff.

Project Area
Pervious Impervious
Area
(acres or sq ft)
Percentage
Area
(acres or sq ft)
Percentage
Pre-Project Conditions 1.21 ac 38% 1.95 ac 62%
Post-Project Conditions 1.12 ac 35% 2.04 ac 65%
•••••••••••••••••••••••••••••••••••••••••••••••••• ······························••(••··························· ·······························••❖••··························· 1808
Water Quality Management Plan (WQMP)

Presidio Section 2

Page 5 ends

2.2 Post Development Drainage Characteristics
The proposed redevelopment replaces an existing commercial property that slopes from northwest to southeast. The northern and western boundaries feature a 2:1 hillside slope with v-ditches that intercept runoff; under the new design, this drainage will be conveyed through underground pipes to the front of the property, maintaining existing hydraulic patterns. Onsite stormwater will be collected via area drains and directed to a biofiltration system for treatment before being pumped for final discharge into Argonaut.

2.3 Property Ownership/Management
The property is owned by Brandywine Homes.
1809
Water Quality Management Plan (WQMP)

Presidio Section 3

Page 6 ends

Section 3 Site & Watershed Characterization

3.1 Site Conditions

3.1.1 Existing Site Conditions
The subject site is located at 15 Argonaut, Aliso Viejo, CA. The site is bounded on the north by Glenwood Drive, on the west by Aliso Viejo Pkwy, and the south and east by commercial developments. The north and west side of the property consists of a 2:1 hillside slope which drains to v-ditches. The runoff from the v-ditches discharge to the surface and flow to the front of the property along with all other surface flows where it discharges to Argonaut.

Existing Land Uses
Land Use Description Total Area
(acres)
Impervious
Area
(acres)
Pervious Area
(acres)
Imperviousness
(%)
Commercial
Development

3.16 1.21 1.95 62%

Total 3.16 1.21 1.95 62%

3.1.2 Infiltration-Related Characteristics

3.1.2.1 Hydrogeologic Conditions
Regionally, the subject site is located in the Peninsular Ranges geomorphic province, which characterizes the southwest portion of southern California where right-lateral major active fault zones predominately trend northwest-southeast. The Peninsular Ranges province is composed of plutonic and metamorphic rock, with lesser amounts of Tertiary volcanic and sedimentary rock, Quaternary drainage in-fills and sedimentary veneers.

3.1.2.2 Soil and Geologic Infiltration Characteristics
Monterey Formation: The Miocene-age Monterey Formation observed onsite primarily consists of silty sandstone, clayey sandstone, sandy claystone, sandstone, and claystone. The fine grained silty sandstone onsite is pale brown, white, dark yellowish brown, and brown in a slightly moist to moist and medium dense to very dense condition. The fine grained clayey sandstone onsite is pale brown, white, dark brown, brown, gray, light gray, dark grayish brown, and bluish gray in a slightly moist to moist and medium dense to dense condition. The sandy claystone onsite is dark 1810
Water Quality Management Plan (WQMP)

Presidio Section 3

Page 7 ends

brown, brown, and gray in a moist and stiff to very stiff condition. The very fine to fine grained sandstone onsite is pale brown, yellowish brown, grayish pale brow, and orange in a slightly moist and medium dense to very dense condition. The claystone onsite is dark brown to brown in a moist and very stiff condition. This unit was logged to a depth of 51.5 feet below the ground surface and is overlain by a thin layer of asphalt.

3.1.2.3 Geotechnical Conditions
Groundwater was not encountered during our subsurface investigation. Based on state-provided information, the historic-high groundwater is greater than 20.0 feet below the ground surface (CGS, 2001). The most recent groundwater data retrieved from the nearest groundwater monitoring site, site ID 336555N1176965W001, was recorded in 2024 and indicates groundwater was approximately greater than 60.0-feet at that time (CDWR, 2025).

3.1.2.4 Summary of Infiltration Opportunities and Constraints of Existing Site Infiltration will not suffice, due to the existing constraints with the existing soil conditions.

Therefore, the project will require biofiltration.

3.2 Proposed Site Development Activities

3.2.1 Overview of Site Development Activities
The proposed site development consist of 58 townhomes, drive aisles, sidewalks, and landscape amenities.

3.2.2 Project Attributes Influencing Stormwater Management Potential pollutant-generating activities include:
• Automobile repair and maintenance
• Automobile washing/ parking
• Home and garden care activities
• Pet Waste
• Green waste
• Irrigation
Plants known to have excessive root systems should also be avoided near structural improvements as they can cause heave conditions. Drought-resistant and maintenance-free plant species are recommended.
1811
Water Quality Management Plan (WQMP)

Presidio Section 3

Page 8 ends

Proposed Land Uses
Land Use Description Total Area
(acres)
Impervious
Area
(acres)
Pervious Area
(acres)
Imperviousness
(%)
Hardscape and Buildings 2.04 2.04 0 65%
Landscape 1.12 0 1.12 35%
Total 3.16

3.2.3 Effects on Infiltration and Harvest and Use Feasibility The existing soil type does not allow for adequate infiltration; however the site has been designed to try to drain hardscape areas into pervious areas to help increase the amount of natural infiltration. Harvest and use feasibility was also considered. A comparison of the Design Capture Volume (DCV) in gallons was compared to an estimated net wet season total water use (ETWU) in gallons. The results show that the DCV is greater than the ETWU, which makes harvest and use infeasible. Please see calculations in the Attachments. The proposed biofiltration system is required to treat the majority of the low flow runoff, due to the inability of adequate infiltration of the site with the existing soil type.

3.3 Receiving Waterbodies
Stormwater runoff from the project site discharges onto Argonaut, where it is conveyed via curb and gutter eastward to a catch basin. From there, flows are directed into Aliso Creek, eventually discharging into the Pacific Ocean.
303(d) List
Aliso Creek: Indicator Bacteria, Nutrients, Selenium, Malathion, Benthic Community Effects TMDL
Aliso Creek: Total Coliform, Fecal Coliform, Enterococcus

3.4 Stormwater Pollutants or Conditions of Concern
Residential water quality issues and related potential pollutants include the landscape planning and site design of the project. These proposed swales can trap pollutants such as suspended solids, oil and grease, as well as trace metals and it will reduce the flow velocity of storm water runoff. 1812
Water Quality Management Plan (WQMP)
Presidio Section 3

Page 9 ends

Pollutants or Conditions of Concern
Pollutant
Expected from
Proposed Land
Uses/Activities
(Yes or No)
Receiving
Waterbody
Impaired
(Yes or No)
Priority
Pollutant
from WQIP
or other
Water
Quality
Condition?
(Yes or No)
Pollutant of
Concern
(Primary, Other,
or No)
Suspended-Solids Yes No Yes Primary
Nutrients Yes No Yes Primary
Heavy Metals No No Yes Primary
Bacteria/Virus/Pathogens Yes No Yes Primary
Pesticides No No Yes Primary
Oil and Grease Yes No No No
Toxic Organic
Compounds No No No No
Trash and Debris Yes No No No
Dry Weather Runoff No No No No

3.5 Hydrologic Conditions of Concern
Does a hydrologic condition of concern exist for this project No – An HCOC does not exist for this receiving water because (select one):

Project discharges directly to a protected conveyance (bed and bank are concrete lined the entire way from the point(s) of discharge to a receiving lake, reservoir, embayment, or the Ocean
Project discharges directly to storm drains which discharge directly to a reservoir, lake, embayment, ocean or protected conveyance (as described above) The project discharges to an area identified in the WMAA as exempt from hydromodification concerns
Yes – An HCOC does exist for this receiving water because none of the above are applicable.

The projected is not exempt to hydromodification as shown on the TGD Exemption Maps. □
□
□
□
I I
I I
1813
Water Quality Management Plan (WQMP)
Presidio Section 3

Page 10 ends

The proposed project condition does not result in an increase in runoff, as demonstrated in the Drainage Report. The existing condition generates a higher runoff due to its commercial land use classification. Therefore, hydromodification requirements are satisfied, as the project does not increase runoff from existing to proposed conditions. See supporting calculations in the attachments.

Project
County Stonn Drain Data - Dec.15, 2010
Storm Drain Type
Unknown
-- Engineered
-- Non-Engineered
Legend
-- Regional Board Boundary
D City Boundary
D County Boundary
Hydromodification Exemptions
Engineered Channels/Large River - Exempt
Non-Engineered Channels - Not Exempt
..
~ - --..LL -
·t
~
l ./-
.,
f · ~ r--- \
1814
Water Quality Management Plan (WQMP)
Presidio Section 3

Page 11 ends

3.6 Critical Course Sediment Yield Areas
There are no potential critical coarse sediment yield areas on the site per the potential coarse sediment map in Attachments of the technical guidance document.

Project
Figure 4 Potential Coarse Sediment
N
i, '- - ==----•,.., Geosyntecl> ~ consul.tams Publubon : 03r'21J2017 e Potential Coarse Sediment
--Inland Receiving Waters c::::! Global Watershed Boundary C] Walershe<I Boundaries
- Potential Coarse Sedimenr
• Areas show the intersection of:
1) High and Highest Potential for
Erosion:
2) CB. CSI and CSP for Geology; and
3) Agriculture, Open Space and
Vacant for Land Use.
1815
Water Quality Management Plan (WQMP)

Presidio Section 4

Page 12 ends

Section 4 Site Plan and Drainage Plan

4.1 Drainage Management Area Delineation
The Project will be characterized with four drainage management areas, however only one area (DMA 1) will be required to treat runoff. The other three areas are from hillside runoff which will be routed through the site via underground storm drain pipes and will be discharged to Argonaut.

DMA 1 consists of all proposed impervious areas and landscaped/pervious areas (see WQMP Site Plan). More specifically, DMA 1 will include flows originating from the buildings, drive aisles, hardscape, and landscape areas. Runoff from DMA 1 will be treated by a biofilter and then pumped to Argonaut.

4.2 Overall Site Design BMPs
Minimize Impervious Area - This Project was designed as a single-family residence with appropriate hardscape areas and drive.

Preserve Existing Drainage Patterns and Time of Concentration - Existing drainage patterns were preserved by limiting the grading area and preserving slope directions.

Disconnect Impervious Areas – Disconnect impervious areas through the use of landscape planters.

Protect Existing Vegetation and Sensitive Areas - Existing vegetation will be supplemented and/or replaced with additional vegetation.

Revegetate Disturbed Areas - The portion of the disturbed area that is pervious will be revegetated or overlain with synthetic grass.

Soil Stockpiling and Site Generated Organics - There will be no soil stockpiling or site generated organics as landscaping will be maintained by the owner on a regular basis.

Water Efficient Landscaping - Water efficient landscaping will be implemented.

Slopes and Channel Buffers - Slopes will be either undisturbed or vegetated.

4.3 DMA Characteristics and Site Design BMPs

4.3.1 DMA 1
DMA 1 consists of all proposed impervious areas and landscaped/pervious areas (see WQMP Site Plan). More specifically, DMA 1 will include flows originating from the buildings, drive aisles, hardscape, and landscape areas. Runoff from DMA 1 will be treated by a biofilter and then pumped to Argonaut.
1816
Water Quality Management Plan (WQMP)
Presidio Section 4

Page 13 ends

4.3.3 DMA Summary
Drainage Management Areas
DMA
(Number/Description)
Total
Area
(acres)
Imperviousness
(%)
Infiltration
Feasibility Category
(Full, Partial, or No
Infiltration)
Hydrologic Source
Controls Used
DMA 1 3.16 65% No None

4.4 Source Control BMPs
Non-Structural Source Control BMPs
Identifier Name
Check One
Reason Source Control is
Not Applicable Included Not
Applicable
N1 Education for Property Owners,
Tenants and Occupants X
N2 Activity Restrictions X
N3 Common Area Landscape
Management X
N4 BMP Maintenance X
N5 Title 22 CCR Compliance (How
development will comply)

X SINGLE-FAMILY

RESIDENTIAL
N6
Local Industrial Permit Compliance

X SINGLE-FAMILY

RESIDENTIAL
N7
Spill Contingency Plan

X SINGLE-FAMILY

RESIDENTIAL
N8 Underground Storage Tank
Compliance

X SINGLE-FAMILY

RESIDENTIAL
N9 Hazardous Materials Disclosure
Compliance

X SINGLE-FAMILY

RESIDENTIAL
N10
Uniform Fire Code Implementation

X SINGLE-FAMILY

RESIDENTIAL
CJI I
, .................................................................................................................................................................. . , .................................................................................................................................................................. . , .................................................................................................................................................................. . , .................................................................................................................................................................. . 1817
Water Quality Management Plan (WQMP)
Presidio Section 4

Page 14 ends

N11
Common Area Litter Control

X SINGLE-FAMILY

RESIDENTIAL
N12
Employee Training

X SINGLE-FAMILY

RESIDENTIAL
N13
Housekeeping of Loading Docks

X SINGLE-FAMILY

RESIDENTIAL
N14 Common Area Catch Basin Inspection X
N15 Street Sweeping Private Streets and
Parking Lots
X
N16
Retail Gasoline Outlets

X SINGLE-FAMILY

RESIDENTIAL
Structural Source Control BMPs
Identifier Name
Check One
Reason Source Control is Not
Applicable Included Not
Applicable
S1 Provide storm drain system stenciling
and signage Residential Development
S2
Design and construct outdoor material
storage areas to reduce pollution
introduction
Residential Development
S3
Design and construct trash and waste
storage areas to reduce pollution
introduction
Residential Development
S4
Use efficient irrigation systems &
landscape design, water conservation,
smart controllers, and source control

S5
Protect slopes and channels and
provide energy dissipation Slopes will be vegetated and (see WQMP Site Plan)
Incorporate requirements applicable to
individual priority project categories
(from SDRWQCB NPDES Permit)

S6 Dock areas RESIDENTIAL
S7 Maintenance bays RESIDENTIAL
S8 Vehicle wash areas RESIDENTIAL
S9 Outdoor processing areas RESIDENTIAL
S10 Equipment wash areas RESIDENTIAL
, .................................................................................................................................................................. . , .................................................................................................................................................................. . □ ~
□ ~
□ ~
~ □
~ □
~ □
□ ~
□ ~
□ ~
□ ~
□ ~
1818
Water Quality Management Plan (WQMP)
Presidio Section 4

Page 15 ends

S11 Fueling areas RESIDENTIAL
S12 Hillside landscaping
Slopes will be vegetated (see
WQMP Site Plan)
S13 Wash water control for food
preparation areas RESIDENTIAL
S14 Community car wash racks RESIDENTIAL
□ ~
~ □
□ ~
□ ~
1819
Water Quality Management Plan (WQMP)

Presidio Section 5

Page 16 ends

Section 5 Low Impact Development BMPs

5.1 LID BMPs
The project proposes to use a proprietary biotreatment system to treat stormwater runoff. A conventional biotreatment system was evaluated and sized (see the attached calculations); however, the proposed site development does not provide sufficient space to accommodate a conventional biotreatment facility. Although a proprietary biotreatment system is not the preferred option in the BMP selection process, it has been determined to be the only feasible treatment alternative for this site while meeting the project constraints.

The proposed project consists of a townhome development that has been designed to provide the minimum number of dwelling units necessary to maintain project feasibility while satisfying applicable fire access, grading, and life safety requirements. Any reduction in the proposed unit yield would result in an economically infeasible project due to fixed development costs and required infrastructure improvements.

Infiltration-based and volume retention BMPs were evaluated; however, these approaches are not feasible for the site. As documented in the project geotechnical/soils report, onsite soils are not suitable for infiltration; therefore, infiltration-based compliance is not viable.

The site is also constrained by the required infrastructure improvements necessary to support the development, including domestic water service (serving residential units and fire protection hydrants), sanitary sewer facilities, storm drain improvements for both hillside and developed area drainage, and electrical utilities. These improvements, in combination with grading constraints and fire access requirements, do not allow sufficient area for implementation of a conventional flowthrough or storage-based treatment control system.

Based on the above constraints, the project qualifies as a space-limited project under Section 4.2.4.1, Option 2 (Project-Specific Space Allocation) of the WQMP requirements. A proprietary biotreatment system is therefore proposed as the most feasible treatment control BMP due to its compact footprint and ability to provide the required water quality treatment within the constrained development envelope without modification to the approved site layout or reduction in unit count.

5.1.1 Hydrologic Source Controls
No HSC’s are applicable:

HSC-1: Not applicable due to the lack of infiltration potential at the site.

HSC-2: Not applicable due to the lack of infiltration potential at the site.

HSC-3: Not feasible because the required 20- to 30-foot tree canopy diameter cannot be achieved within the site constraints.
1820
Water Quality Management Plan (WQMP)
Presidio Section 5

Page 17 ends

HSC-4: Not feasible because overflow dispersion requires a minimum 8-foot separation from buildings, which cannot be accommodated by the proposed site layout.

HSC-5: Not feasible due to the significant cost impacts to the project.

HSC-6: Not applicable due to the lack of infiltration potential at the site.

5.1.2 Structural LID BMP for DMA 1
Proprietary biotreatment (BIO-7) BMP’s will be used to treat the stormwater runoff for DMA 1.

This BMP satisfy the LID performance standard using the Flow-Based Compact Biofiltration Sizing Method. The required design flow rate for the BIO-7 BMP was calculate as follows:

Time of concentration (Tc) = 10 minutes
The time of concentration was calculated using the Orange County Hydrology Manual (OCHM) time of concentration nomograph (see time of concentration nomograph in Attachments). The time of concentration found by using the OCHM nomograph is 10 minutes.  = ×
×
× 1.5
= 0.75 ×
 + 0.15
= 0.75 × 0.65 + 0.15
= 0.64
I1 = 0.225 in/hr
 = 0.64 × 0.225 

× 3.16

 = 0.45
!
"#$% = 1.5 ∗ 0.45
! = 0.68
!
The proprietary BIO-7 BMP used for this project is the Modular Wetlands Biofiltration System 8’ x 16’.

5.2 Summary of LID BMPs

LID BMP
(Number/Description)
Average
Total Area
(square feet)
Depth
(feet)
Total Volume
(cubic feet) I □
1821
Water Quality Management Plan (WQMP)
Presidio Section 5

Page 18 ends

Biotreatment 128 4.0 512 II II
1822
Water Quality Management Plan (WQMP)

Presidio Section 6

Page 19 ends

Section 6 Hydromodification BMPs

6.1 Points of Compliance
Point of Compliance is considered to be the manhole where all storm runoff is captured and flows to a single point. The Point of Compliance was selected since runoff flows to this location.

6.2 Pre-Development (Natural) Conditions
The pre-developed site is assumed to be a straight grade from the top of the slope on the west side to the existing street on the east side with a slope of greater than 15%.

6.3 Post-Development Conditions and Hydromodification BMPs The post development site will consist of 58 townhomes, drive aisles, walkways, and landscape amenities. The project will not discharge more runoff than allowed by hydromodification requirements.

6.4 Measures for Avoidance of Critical Coarse Sediment Yield Areas
There are no potential critical coarse sediment yield areas on the site per the potential coarse sediment map in Appendix N of the technical guidance document (see the Appendix – Potential Course Sediment Areas Map).

6.5 Hydrologic Modeling and Hydromodification Compliance The project site is located within a Hydromodification control zone and is required to mitigate any increase in runoff peak flow rates between existing and proposed conditions. As documented in the attached South Orange County Hydrology Manual, storm drain chamber were sized to mitigate runoff per hydromodification requirements. Therefore, the project meets and exceeds the minimum Hydromodification requirements.
1823
Water Quality Management Plan (WQMP)
Presidio Section 7

Page 20 ends

Section 7 Educational Materials Index
Educational Materials
Residential Material
(http://www.ocwatersheds.com)
Check If
Applicable
Business Material
(http://www.ocwatersheds.com)
Check If
Applicable
The Ocean Begins at Your Front Door x Tips for the Automotive Industry Tips for Car Wash Fund-raisers Tips for Using Concrete and Mortar Tips for the Home Mechanic x Tips for the Food Service Industry Homeowners Guide for Sustainable
Water Use x
Proper Maintenance Practices for Your
Business
Household Tips x
Compliance BMPs for Mobile
Businesses
Proper Disposal of Household
Hazardous Waste x
Other Material
Check If
Recycle at Your Local Used Oil Attached
Collection Center (North County)
Recycle at Your Local Used Oil
Collection Center (Central County)
Recycle at Your Local Used Oil
Collection Center (South County) x
Tips for Maintaining a Septic Tank
System
Responsible Pest Control x
Sewer Spill x
Tips for the Home Improvement Projects x
Tips for Horse Care
Tips for Landscaping and Gardening x
Tips for Pet Care x
Tips for Projects Using Paint x
D I
□
□ □
□
□
□
□
□ □
□
□ □
□
□
□
□ □
□
□
□
1824
Water Quality Management Plan (WQMP)

Presidio

Attachment A: EDUCATIONAL MATERIALS
1825
Proper Maintenance of
Pools & Spas
To Protect our waterways
Who is H2OC?
H2OC is YOU. H2OC is also a
cooperative stormwater program
which includes all 34 cities in Orange
County, the County of Orange,
and Orange County Flood Control
District (OCFCD). Clean and healthy
beaches, creeks, rivers, bays,
wetlands, and ocean are important
to Orange County. H2OC provides
resources to residents and businesses
to encourage personal action and
prevent polluted runoff from entering
our waterways.

Join Us
Contact
Visit h2oc.org to learn more about runoff,
water pollution, and how you can be the
solution to runoff pollution and protect our
water resources.
24-hour Polluti on Reporti ng Hotline:
1-877-89-SPILL (1-877-897-7455)
24-hour Reporti ng Website:
myOCeServices.ocgov.com
For emergencies, dial 911
Unlike water in sanitary sewers (from sinks and
toilets), water in storm drains is not treated or
cleaned before entering our waterways and
should never contain any pollutants. Many
pools and spas are plumbed to drain directly to
the sanitary sewer. If yours is not, you must take
necessary steps before draining to landscaped
areas or into the storm drain.

While the focus of this brochure is pools and
spas, these requirements also apply to water
features and fountains.

POOL AND SPA

DRAINAGE
□
STORHWATER PROGRAM 1826

PROPER DISPOSAL HOW TO KNOW

IF YOU ARE

FOLLOWING THE

STANDARDS

DOING YOUR PART
Disposal Process
PROPER
MAINTENANCE When you cannot dispose of pool and spa
water in the sanitary sewer, the release
of dechlorinated pool and spa water to a
landscaped area or in the storm drain system is
allowed only if these parameters are met:

Some cities may have ordinances that do not
allow pool water disposal into a storm drain.

Find your city’s stormwater page here:
h2oc.org/cities to check regulations.
pH is between 6.5 and 8.5.

Residual chlorine does not exceed 0.1 mg/L
(parts per million).

Water is clean and clear, free of any unusual
coloration, dirt, or algae.

There is no discharge of fi lter media or acid
cleaning wastes.

Saltwater pools must be discharged to the sanitary
sewer, landscaped areas, or other pervious
surfaces that can accommodate the volume of
water. Alternatively, they can be discharged
directly to a naturally saline body of water.

You can fi nd out how much chlorine is in
your water by using a pool testing kit. Before
discharging, reduce chlorine to 0.1 mg/L by
discontinuing its use for a few days, or by using
dechlorinating chemicals purchased from a
local pool supply company. Always follow the
instructions that come with any products you use.

By following these requirements, you will make
a signifi cant contribution towards keeping
pollutants out of Orange County’s waterways.

You can help protect organisms that are
sensitive to pool chemicals and maintain the
health of our environment.
• When possible, discharge all water to the
sanitary sewer.
• Monitor the drain hose to prevent leakage.
• Remove trash and debris in the fl ow path
between the pool or spa and storm drain.
• Monitor the rate of fl ow to ensure that draining
the pool or spa does not cause erosion or fl ooding.
• To prevent vectors and algae do not allow
dechlorinated water to stand for more than
72 hours.
• Clean your pool regularly, maintain consistent
and adequate chlorine or sodium bromide
levels, monitor pH levels, and maintain your
fi ltration and circulation system.
• Rinse pool fi lters and diatomaceous earth fi lters
in landscaped areas where water and debris can
readily soak into the soil.
• When draining pools or rinsing fi lters to a
landscaped area, cover any landscape drains to
prevent water from reaching the storm
drain system.
• Used diatomaceous earth should be tossed
in with solid garbage. It should never be
discharged into storm drains or any place where
it may wash into streams, rivers, or the ocean.
• Store chemicals indoors.
storm
drain
OCEAN

UNTREATED
1827
Private Sewer Lateral and Connection
(This is the property owner’s responsibility to maintain.) tree roots can
block and break
the private
sewer lateral
Property
Line
SEWER
WES RE
drains
untreated
into ocean
Storm Drain
Public Sewer
Private Sewer Lateral
Connection
Public Sewer
A Property Owner’s Guide to
Private Sewer Laterals
Sewer System Maintenance The Sanitary Sewer System Who is H2OC? H2OC is YOU! H2OC is also a
cooperative stormwater program
which includes all 34 cities in Orange
County, the County of Orange,
and Orange County Flood Control
District (OCFCD). Clean and healthy
beaches, creeks, rivers, bays,
wetlands, and ocean are important
to Orange County. H2OC provides
resources to residents and businesses
to encourage personal action and
prevent polluted runoff from entering
our waterways.

Every property with sewer service owns
a private sewer line, also known as a
“private lateral.” The private lateral carries
wastewater from indoor plumbing fi xtures,
like toilets‚ sinks‚ and dishwashers, to the
public sewer line under the street. The sewer
system transports wastewater to treatment
plants before being released. It is important
to maintain your private laterals to prevent
sewage spills that can reach our storm drains.

Unlike water in sanitary sewers, water that
fl ows into storm drains is not treated before
entering our waterways and should never
contain sewage.

Property owners are responsible for
maintaining their private laterals from the
connection at the home or business to the
connection with the public sewer; this can
include areas under the sidewalk and the
street. Inadequate maintenance of laterals
can result in sewer backups and spills.

Operation and maintenance of the local,
public, and regional sewer lines, on the other
hand, are the responsibility of the sewer
agency.* Visit the link inside for agency
contact information.

Join Us
Contact
Visit h2oc.org to learn more about runoff,
water pollution, and how you can be the
solution to runoff pollution and protect our
water resources!
24-hour Pollution Reporting Hotline:
1-877-89-SPILL (1-877-897-7455)
24-hour Reporting Website:
myOCeServices.ocgov.com
For emergencies, dial 911
How to
Prevent
& Report
Sewage Spills
Developed in Collaborati on
with Orange County’s
Sewer Agencies
,
, STORHWATER PROGRAM 1828
Sewer overfl ow
Plumber making repairs on private lateral
household sewage
* Scan for more sewage spill resources or visit https://h2oc.org/resources/pollution-prevention-for-residents/sewage-maintenance/ Backups and Sewage Spills
Sewage spills and backups occur when the
wastewater being transported is blocked and
overfl ows or leaks out of broken pipes inside or
outside of your building. Once out of the pipe,
the sewage can discharge to the curb, gutter,
and storm drain system, which fl ows to local
waterways. Sewage spills can cause health
hazards, beach closures, damage to homes and
businesses, and threaten the quality of our local
waterways. As a property owner, if sewage from
your property discharges to a gutter or storm
drain, you may be subject to fi nes, penalties, or
increased rates.

Common Causes

BLOCKAGES
Common causes of blockages include
• Flushing anything other than toilet paper,
including: wipes (even those advertised as
“fl ushable”), feminine products, rags, and
other items.
• Fats, oils, and grease (FOG) can get into the
private lateral from household drains, as
well as from poorly maintained commercial
grease traps and interceptors.
• Tree roots can fi nd their way into cracked
or broken sewer laterals and
cause blockages.

STRUCTURAL PROBLEMS
Common structural problems include
• Broken/cracked pipes.
• Deteriorated, missing, or broken cleanout caps.
• Aging or undersized sewers.

Keep Your Private Laterals
Functioning Properly
Prevent Blockages
Remember, the drain is not a dump!
• Only fl ush toilet paper down the toilet.
• Use a mesh sink strainer to catch food scraps
before they go down the drain.
• Scrape food scraps into a designated food
waste/organics receptacle before rinsing dishes
and utensils in the sink.
• After cooking at home, let grease cool then
pour or scrape it into a metal can. When the
can is full, dispose of grease properly.
• For businesses, grease traps or interceptors
must be serviced regularly. Have spill kits
readily available for cleaning up spills.
• Do not plant trees or large shrubs above or
within several feet of your sewer laterals.

Structural Maintenance
• Contact a licensed plumber to determine the
optimal maintenance schedule.
• Perform periodic cleaning to eliminate grease,
debris, and roots from private laterals.
• Repair or replace deteriorated or damaged
private laterals as soon as possible.
• Install a backfl ow device to prevent sewage
from ending up in your home or business.

Identify & Report Sewage
Spills or Backups
Know the Signs
Sewage spills can cause damage to your property,
the environment, and our local waterways. Look
for potential signs of a spill, which may include:
• Drains are operating slower than normal and
continuing to slow over time.
• Drains backup inside of buildings.
• Unusually wet or soggy ground in your yard
that may be accompanied by odors.
• Leakage from sewer cleanouts, outside
drains, or manhole lids.

Report Sewage Spills
Immediately
• If you suspect a sewer backup or leak, contact a
licensed plumber.
• If you observe a sewer spill from a cleanout or
manhole, contact your sewer agency.*
• Plumbers should contact the sewer agency prior
to pushing roots from private sewer laterals to
the sewer main.

Alternatively, you can contact the 24-Hour
Pollution Reporting Hotline by calling
1-877-89-SPILL (1-877-897-7455) or visiting
myOCeServices.ocgov.com.

Spill Control & Containment
• Turn off main water supply or stop all water use.
• Have a plumbing professional clear the
blockage and make necessary repairs.
• Keep people and pets away from the
affected area.
• When safe, place sandbags or other material
in the fl ow path of the spill to control, contain,
and prevent sewage from entering the storm
drain system.
1829
Landscape
& Sustainable
Water Use Guide
Making Your
Landscape
Stormwater-Safe
Runoff is the flow of water from your property that
doesn’t get absorbed into the ground. When harmful
substances like pesticides, fertilizer, and dirt are
handled improperly, this water can pick them up
on its way to the storm drain system where it flows
untreated to our creeks, rivers, and ocean. There are
simple actions you can take to collect runoff and use
it on site to maintain your landscape and protect our
water resources.

This guide will help you use rainwater as a resource
to waste less water and keep your landscape
stormwater-safe. Planting OC Garden Friendly
plants, proper watering practices, and harvesting
and using rainwater are terrific ways to beautify your
landscape while protecting our water resources.

Continue reading to learn how!

STORMWATER PROGRAM
0 .J
1830
What Are OC Garden Friendly Plants?
OC Garden Friendly plants are either native or adapted to Orange County. Because they’re accustomed to our climate, they require less water, pesticides, and fertilizer than other plants. These plants can be terrific assets to waste less water and keep our waterways healthy. Here are some beautiful OC Garden Friendly plants to add to your garden:

African daisy Baja fairy duster
Germander
Narrow-leaf
milkweed Pumpkin monkey
Sea lavender
Sage
Pine muhly grass Beach strawberry Yellow monkey
Marina madrone
California fuchsia
Penstemon
Douglas iris
Desert willow
Sundrops Texas ranger
Gaura
Pacific mist manzanita
Rock rose
Toyon
Groundcover Shrub
Perennial
Tree
Where to Use Them:

Shiny evergreen
leaves with
drooping flower
clusters followed
by berries
lasting into late
winter. Plant if
you want to see
hummingbirds!
Attractive tree
with bright
flowers appearing
in mid-spring
and leaves
that shed each
winter. Water
deeply once or
twice a month
in the summer
to promote
flowering.

Heat and
drought-tolerant
groundcover with
showy flowers.

Terrific
groundcover for
a dry garden
whose colorful
flowers blossom
in the spring.
https://water.ca.gov/Programs/Water-Use-And-Efficiency/Urban-Water-Use-Efficiency/ Model-Water-Efficient-Landscape-Ordinance
For more information regarding how to create a sustainable landscape please visit the UCCE Master Gardeners of Orange County website: https://mgorange.ucanr.edu.

Photos credited to GardenSoft Corp. – Left Page: Coral bells/Allum root, Sage, Penstemon, Gaura, Rock rose, Douglas iris, Pumpkin monkey, Pine muhly grass, Beach strawberry, Yellow monkey, Baja fairy duster, Pacific mist manzanita, Toyon, Westringia/Coast rosemary, Desert museum palo verde, Marina madrone, and Desert willow. Right Page: All photos.

Scan to learn more:

Coral bells/
Allum root
Desert museum
palo verde
1 4
2 5
Charming and fragrant evergreen
shrub with lavender flowers which
shine in the spring.

Westringia/Coast rosemary
3 2
4 3
1 5
Note: For new or rehabilitated landscape projects greater than 500 sq. ft., it is mandatory to follow the Model Water Efficient Landscape Ordinance (MWELO) standards for landscape design and installation. These are a set of minimum standards to be followed. Check with your local city for specific requirements.
[I] .
1831
WHO IS H2OC?
H2OC is YOU! H2OC is also a cooperative
stormwater program which includes all 34 cities in
Orange County, the County of Orange, and Orange
County Flood Control District (OCFCD). Clean and
healthy beaches, creeks, rivers, bays, wetlands,
and ocean are important to Orange County. H2OC
provides resources to residents and businesses to
encourage personal action and prevent polluted
runoff from entering our waterways.

JOIN US
Visit h2oc.org to learn more about runoff, water
pollution, and how you can be the solution to
runoff pollution and protect our water resources!

CONTACT
24-hour Pollution Reporting Hotline:
1-877-89-SPILL (1-877-897-7455)
24-hour Reporting Website:
myOCeServices.ocgov.com
For emergencies, dial 911
Watering
Proper irrigation practices are critical to protect Orange County’s water bodies.
• Utilize smart irrigation controllers and, and/or soil moisture sensors. These can help manage your garden’s
water needs to waste less water.
• Take advantage of a drip irrigation system to directly water plant roots. This reduces water loss and runoff.
• Install rotating sprinkler nozzles to spread water
more uniformly across your landscape.

Rainwater Collection and Use
In Orange County, 60%-70% of water is used for irrigation and other outdoor uses. Collecting and using rainwater are great ways to decrease water usage.
• Direct downspouts to flow towards vegetated areas to
reduce runoff and use a splash block to prevent erosion. • Install a rain barrel to collect rainwater from roofs and use for landscape irrigation. Make sure it has a screen, spigot to siphon water for use and an overflow tube.
• Build a rain garden using OC Garden Friendly plants and other landscape materials.

Rebates
Beautify your landscape in stormwater-safe ways by
utilizing rebates from your local water district or the Municipal Water District of Orange County (MWDOC).

Save money on water-efficient devices like smart irrigation controllers, high-efficiency nozzles, soil moisture sensors, and drip irrigation systems. Also, upgrade your landscape with their conversion rebates to replace turf with OC
Garden Friendly plants. These rebates can change
frequently, so check with your local water agency and
MWDOC (mwdoc.com/rebates) regularly.

THANK YOU FOR PROTECTING OUR WATERWAYS BY
CREATING AN OC GARDEN FRIENDLY LANDSCAPE.

Learn more at our Overwatering is Out webpage by
scanning the QR code or visiting:
h2oc.org/resources/take-action/overwatering-is-out.

Sustainable Water Use Best Practices
1832
Help Prevent Ocean Pollution:

Recycle at Your
Local Used Oil
Collection
Center

SOUTH COUNTY
For more
information, please call the Orange
County Stormwater Program at
1-877-89-SPILL (1-877-897-7455)
or visit www.watersheds.com.

For information about the proper
disposal of household hazardous waste,
call the Household Waste Hotline at
(714) 834-6752
or visit www.oclandfills.com.

For additional information about the
nearest oil recycling center, call the Used
Oil Program at
1-800-CLEANUP
or visit www.cleanup.org.

Did you know that just
one quart of oil can pollute 250,000
gallons of water?
A clean ocean and healthy creeks, rivers,
bays and beaches are important to Orange
County. However, not properly disposing of
used oil can lead to water pollution. If you
pour or drain oil onto driveways, sidewalks
or streets, it can be washed into the storm
drain. Unlike water in sanitary sewers (from
sinks and toilets), water in storm drains is
not treated before entering the ocean. Help
prevent water pollution by taking your used
oil to a used oil collection center.

Included in this brochure is a list of
locations that will accept up to five gallons
of used motor oil at no cost. Many also
accept used oil filters. Please contact the
facility before delivering your used oil. This
listing of companies is for your reference
and does not constitute a recommendation
or endorsement of the company.

Please note that used oil filters may not be
disposed of with regular household trash.

They must be taken to a household
hazardous waste collection or recycling
center in Anaheim, Huntington Beach,
Irvine or San Juan Capistrano. For
information about these centers, visit
www.oclandfills.com.

Please do not mix your oil with other
substances!
The Ocean Begins at Your Front Door

RECYCLE

USED OIL

PROJECT
Poi!ut1ot\

PREVENTION
1833

ALISO VIEJO
Big O Tires
27812 Aliso Creek Rd, Suite E-100
(949) 362-4225
Econo Lube N’ Tune
22932 Glenwood Dr.
(949) 643-9667
Jiffy Lube
27832 Aliso Creek Road
(949) 362-0005
Pep Boys
26881 Aliso Creek Road
(949) 362-9254

DANA POINT
Dana Point Fuel Dock
34661 Puerto Pl. (949) 496-6113
EZ Lube Inc.
34242 Doheny Park Rd.
(949) 477-1223

FOOTHILL RANCH
USA Express Tire & Service
26492 Town Center Dr.
(714) 826-1001

LAGUNA BEACH
USA Express Tire & Service Inc.
350 Broadway (949) 494-7111

LAKE FOREST
Big O Tires
20742 Lake Forest Dr.
(949) 443-4155
EZ Lube
26731 Rancho Parkway
(949) 465-9912
Firestone Store
24421 Rockfield Blvd.
(949) 581-2660
Jiffy Lube
20781 Lake Forest Dr.
(949) 583-0470
Kragen Auto Parts
24601 Raymond Way
(949) 829-8292
Pep Boys
22671 Lake Forest Dr.
(949) 855-9593
Ryan’s Foothill Ranch Transmission
20622 Pascal Way (949) 770-6888
USA Express Tire & Service
24561 Trabuco Rd (949) 454-8001

LAGUNA NIGUEL
Econo Lube N Tune
27912 Forbes Rd. (949) 364-5833
Laguna Niguel Auto Center
26042 Cape Dr. #12
(949) 582-2191

LAGUNA HILLS
David J Phillips Buick
24888 Alicia Pkwy.
(949) 831-0434
Oilmax 10 Minute Lube
25800 Jeronimo Rd. #300
(949) 859-9271
Ramona Auto Service
27210 La Paz Rd. (949) 583-1233

RANCHO SANTA MARGARITA
Jiffy Lube
23401 Antonio Parkway
(949) 589-7447

SAN CLEMENTE
EZ Lube
525 Avenida Pico (949) 940-1850
Kragen Auto Parts
1113 S. El Camino Real
(949) 492-9850
Kragen Auto Parts
400 Camino de Estrella
(949) 240-9195
San Clemente Car Wash & Oil
1731 N. El Camino Real
(949) 847-4924

SAN JUAN CAPISTRANO
Saturn of San Juan Capistrano
33033 Camino Capistrano
(949) 248-5411
Texaco Xpress Lube
27201 Ortega Hwy.
(949) 489-8008
Used Oil Collection Centers
EZ Lube
24281 Moulton Pkwy.
(949) 830-9840
EZ Lube
26921 Moulton Pkwy.
(949) 751-3436
Kragen Auto Parts
26562 Moulton Ave.
(949) 831-0434
Firestone Store
24196 Laguna Hills Mall
(949) 581-4700

MISSION VIEJO
AAA Complete Auto Care & Tire
27913 Center Street
(949) 347-8200
Autobahn West
25800 Jeronimo Rd. Suite 401
(949) 770-2312
Auto Zone
22942 Los Alisos (949) 830-8181
Econo Lube & Tune
25902 El Paseo (949) 582-5483
Jiffy Lube
27240 La Paz Rd. (949) 455-0470
Kragen Auto Parts
24510 Alicia Pkwy. (949) 951-9175
Mission Viejo Chevron
27742 Crown Vly. Pkwy.
(949) 364-0137
This information was provided by the County of Orange Integrated Waste Management Department and the California Integrated Waste Management Board (CIWMB). 1834 Who is H2OC?
H2OC is YOU. H2OC is also a
cooperative stormwater program
which includes all 34 cities in Orange
County, the County of Orange,
and Orange County Flood Control
District (OCFCD). Clean and healthy
beaches, creeks, rivers, bays,
wetlands, and ocean are important
to Orange County. H2OC provides
resources to residents and businesses
to encourage personal action and
prevent polluted runoff from entering
our waterways.

Join Us
Contact
Visit h2oc.org to learn more about runoff,
water pollution, and how you can be the
solution to runoff pollution and protect our
water resources.
24-hour Pollution Reporting Hotline:
877-89-SPILL (1-877-897-7455)
24-hour Pollution Reporting Website:
myOCeServices.ocgov.com
Orange County Stormwater
Program:
714-955-0600
For emergencies, dial 911
*oclandfills.com/hazardous
**calrecycle.ca.gov/condemo

UNDERSTAND THE

REQUIREMENTS

TO PREVENT

POLLUTION WHEN

COMPLETING
HOME

IMPROVEMENT

PROJECTS
Home improvement activities such as
remodeling, stucco repair, painting,
landscape improvements, and power
washing can generate pollution that can
harm Orange County’s waterways. These
pollutants can include paint, debris,
chemicals, and more. If not properly
managed, these pollutants can flow into
Orange County’s rivers, creeks, channels,
and ocean through our storm drain
system. Unlike water in sanitary sewers
(from sinks and toilets), water that flows
into storm drains is not treated before
entering our waterways and must never
contain pollutants generated by home
improvement projects.

POLLUTION

PREVENTION
No matter how large or small your
home improvement project is, pollution
prevention must always be part of
the process. Use the required best
management practices (BMPs) listed here
to protect our waterways as you make your
improvements. Whether you do-it-yourself
or hire a contractor, you are responsible for
preventing pollution.

Understand the Requirements
When Conducting Home
Improvement Projects
to protect our waterways
C o n d u c t
Home
Improvement
Projects Properly
□
STORMWATER PROGRAM 1835
General Construction
• Plan and complete projects when rain is
not predicted.
• Keep all waste and debris away from the
street, gutter, and storm drain. All area
drains flow into the storm drain and can
reach local waterways.
• Store all materials off of the ground, and
under secured cover such as tarps or plastic
sheets, and never near drains.
• When using concrete or drywall, liquid
waste may be temporarily stored in a baby
pool or plastic lined depression until dried.

Powdery waste, like dry concrete, must be
properly contained in a bag or box before
placing into a dumpster.

Paint
• Before painting, prepare your work area with
tarps to contain drips and spills.
• Rinse tools such as brushes, buckets, and rags
in a sink connected to the sanitary sewer.
• Never wash tools where washwater can
drain into the street, gutter, or storm
drain. Discharges to the storm drain
system are prohibited.
• Store leftover paint in original or clearly
marked containers and in a dry location away
from the elements.
• Dispose of water-based, oil-based, and
aerosol paint at a Household Hazardous
Waste Collection Center (HHWCC).*
• To dispose of small amounts of water-based
paint, remove the lid, let it dry in the can,
and recycle the can in your recycling bin.
• Visit paintcare.org for other disposal options.

Cleaning & Maintenance
• Use dry cleanup methods such as sweeping
or vacuuming whenever possible and clean
work areas at least daily.
• Clean paint, plaster, and drywall tools in
a contained area to prevent pollution. No
discharges to the storm drain are permitted.
• Dispose of solid or non-liquid debris in the
trash or dumpster.
• Hazardous waste must be collected and
disposed of at a Household Hazardous
Waste Collection Center (HHWCC).*
• Vacuum or sweep sawdust and dispose of
it in the trash or green waste bin.

Disposal & Recycling
• Use a construction and demolition
recycling company to properly dispose of
construction materials and debris.**
Spills & Cleanup
• Clean up spills immediately using absorbent
material, then sweep, wipe, or vacuum and
dispose of material properly.
• To clean a paint spill, use rags for a small spill
and dry absorbent material for larger spills.

Dispose of soiled rags and used dry absorbent
material at a Household Hazardous Waste
Collection Center (HHWCC).*
• Report spills that have entered the street,
gutter, or storm drain to the 24-Hour
Pollution Reporting Hotline by calling
1-877-89-SPILL (1-877-897-7455) or visiting
myOCeServices.ocgov.com.

Landscaping
• While new plants are being established, use
BMPs such as mulch, straw wattles, or jute
netting to prevent erosion.
• Use gravel bags or fiber rolls along the
perimeter of your property to keep water on
site and to prevent discharges to the street,
gutter, or storm drain.
• Cover bare soil with mulch.
• Store all bulk materials including soil, mulch,
or gravel under tarps while not in use. For more information scan the QR Code or visit h2oc.org/resources/pollution-prevention-for-residents/home-repair-and-improvements/ 1836 How to be a responsible
Home
Mechanic
To Protect our waterways
Who is H2OC?
H2OC is YOU. H2OC is also a
cooperative stormwater program
which includes all 34 cities in Orange
County, the County of Orange,
and Orange County Flood Control
District (OCFCD). Clean and healthy
beaches, creeks, rivers, bays,
wetlands, and ocean are important
to Orange County. H2OC provides
resources to residents and businesses
to encourage personal action and
prevent polluted runoff from entering
our waterways.

Join Us
Contact
Visit h2oc.org to learn more about runoff,
water pollution, and how you can be the
solution to runoff pollution and protect our
water resources.
24-hour Pollution Reporting Hotline:
877-89-SPILL (877-897-7455)
24-hour Pollution Reporting Website:
myOCeServices.ocgov.com
For emergencies, dial 911
Unlike water in sanitary sewers (from sinks and
toilets), water in storm drains is not treated or
cleaned before entering our waterways and
should never contain any pollutants. Vehicle
maintenance can generate a variety of waste
products which can become pollutants like oil,
gasoline, antifreeze, lubricants, metals, grease,
and other harmful substances. If not properly
managed, these pollutants can be transported
to Orange County’s creeks, rivers, and ocean
through our storm drain system.

VEHICLE

MAINTENANCE
*oclandfills.com/hazardous-waste
**www2.calrecycle.ca.gov/UsedOil/CertifiedCenters
Understand the
Best Practices for
Conducting Car
Maintenance at Home
, J
□
,
C
I •~
,
<~OJ""
J ,. /.

Ji, '
STORHWATER PROGRAM 1837

BE PREPARED &

PLAN AHEAD

USED OIL

RECYCLING

COLLECT &

CONTAIN WASTE
Before working on a vehicle, it is important to
prepare to prevent pollution.

Identify all actions that can cause spills or
release pollutants.

Locate and protect all storm drains on or near
your property in case there is a spill.

Only perform repair and maintenance
activities when it isn’t raining, and on nonporous surfaces like concrete.

Store car parts, batteries, oils, other materials
and waste off the ground, under overhead
cover, and in labeled containers.

Have spill cleanup materials available,
including absorbents like kitty litter, gloves,
goggles, brooms, and rags.

Park leaking vehicles on private property
over a drip pan until repairs can be made.

Take your used oil to one of the many CalRecycle
Certified Used Oil Collection Centers throughout
Orange County.** All Certified Centers will accept
up to five gallons of uncontaminated used oil from
the public absolutely FREE of charge during normal
business hours. Here are some tips for utilizing a
collection center:
• Drain your oil into a clean container with a tight fitting lid and place the filter in a sealed plastic bag.
• Do not mix oil with other substances.
• Many Certified Centers are now accepting used
filters, call the center to confirm.
• There is no I.D. or paperwork required to participate.

There are many types of waste products that
result from vehicle maintenance. Keeping
wastes contained properly will make pollution
prevention simple.
• Use absorbents like rags or kitty litter to clean up
any spills right away.
• Clean work areas using dry methods (use a
vacuum or broom to sweep up debris).
• Drain vehicle fluids into appropriate receptacles
for proper disposal. Check with your city to see if
free recycle kits are offered.
• Place a drip pan under vehicles to capture fluids.
• When possible, perform all bodywork in enclosed
areas. Collect all waste and dispose of it properly.
• All chemicals used to clean parts must be properly
managed. Do not discharge to storm drain.
• If any waste enters the street, gutter, or storm
drain, report it by calling 877-897-7455 or going to
myOCeServices.ocgov.com.
• Most vehicle maintenance byproducts are
hazardous waste and must be disposed of in
accordance with all local, state, and federal laws.*
storm
drain
OCEAN

UNTREATED
For more information about the
used oil program, visit:
ocusedoil.com
or scan the QR code.

Look for a sign like this:
✓ RECYCLE
Used Oil and Filters 11$ed0il.Ofil1enlo:eptedffomtll!PublcalNoCllarge C31Recycle~

R ECYCLE

USED OIL

RECYCLE

USED OIL

FILTERS
1838
*University of California Master Gardeners of Orange County [email protected] mgorange.ucanr.edu/Gardening_ Hotline/
**Visit bewaterwise.com to learn more
Who is H2OC?
H2OC is YOU! H2OC is also a cooperative
stormwater program which includes all 34
cities in Orange County, the County of Orange,
and Orange County Flood Control District
(OCFCD). Clean and healthy beaches, creeks,
rivers, bays, wetlands, and ocean are important
to Orange County. H2OC provides resources
to residents and businesses to encourage
personal action and prevent polluted runoff
from entering our waterways.

Update Your Irrigation
System and Landscape
Switch to Rotating Sprinkler Nozzles: Consider
replacing your sprinkler heads with rotating sprinkler
nozzles. Rotating nozzles water more uniformly and
efficiently, significantly reducing your outdoor water
use. Check with your local water agency for available
rebates on rotating nozzles, irrigation controllers,
and other water efficient devices.

Get Smart: Consider using smart irrigation controllers.

Smart irrigation controllers have internal clocks as
well as sensors that will turn off the sprinklers
in response to environmental changes. If it is raining, too windy, or too cold, the smart irrigation controller will automatically shut off the sprinklers.

Drip don’t Douse: Drip irrigation systems prevent
runoff from carrying pollutants into the storm drain
by watering only the targeted plants using low
volumes of water.

Reduce the Need: Replace water “thirsty” plants
and grass types with water efficient natives or OC
Garden Friendly plants to save water and reduce
the need for pesticides and fertilizer. Please see
the California Friendly® Landscape Maintenance
Guide produced by the Metropolitan Water District
of Southern California** and associated Southern
California Water Agencies for more information.

Group Plants: When adding to or redesigning
your landscaping, plants that require similar
watering needs can be planted together. Grouping
plants with similar watering needs helps prevent
unnecessary watering.
overwatering
Is out
Tips to prevent
Irrigation Runoff
Join Us
Contact
Visit h2oc.org to learn more about runoff,
water pollution, and how you can be the
solution to runoff pollution and protect our
water resources!
24-hour Pollution Reporting Hotline:
1-877-89-SPILL (1-877-897-7455)
24-hour Reporting Website:
myOCeServices.ocgov.com
For emergencies, dial 911
L
□
3 STORMWATER PROGRAM 1839
What is Irrigation Runoff
and How Does it Lead to
Pollution?
Irrigation runoff is water flowing off landscaped
areas, which can carry pollutants to our storm
drains and waterways. It is usually the result
of landscape overwatering, and mismanaged
irrigation systems. Runoff can carry pesticides,
fertilizers, pet waste, and other pollutants into
our storm drains, which flow untreated to the
ocean. Explore the tips below to find out how to
prevent irrigation runoff.

Broken or leaky
sprinklers can waste
thousands of gallons
of water per month
and significantly
increase the amount
of runoff from your
yard. Repairing
sprinklers can
prevent runoff
from entering our
waterways and save
you money.

FIX LEAKS
Adjust the direction
of your sprinkler
heads so water
does not spray
on sidewalks,
driveways or roads.

By simply adjusting
the direction of your
sprinklers, you can
save water, prevent
irrigation runoff,
and keep your
landscape healthy.

PROPER AIM
Watering early in the morning before sunrise
will reduce water loss due to evaporation. Wind
also tends to die down in the early morning, so
the water will irrigate the lawn as intended.

WATER AT SUNRISE
Use an irrigation
timer to minimize
runoff and
maximize water
absorption. Water
districts often
provide irrigation
schedules to
determine the
best water scheme
for your yard.

Contact your
water provider for
a weekly irrigation
schedule.

SET A TIMER

RUN YOUR
SYSTEM
Run and observe
your irrigation
system through
its entire cycle
seasonally
(twice a year) to
look for leaks,
misaligned
sprinkler heads,
and areas of
ponding and/or
runoff.

Garden hoses with
automatic shutoff
nozzles can use less
water than sprinkler
irrigation systems.

Hand watering also
ensures only those
areas that need water
get it and prevents
irrigation runoff. An
easy alternative
to sprinklers, hand
watering can help keep
our waterways clean!

HAND WATER
PLANTS
Prevent fertilizers
and pesticides
from entering
our waterways by
not watering your
lawn 48 hours after
application and
stopping application
48 hours before a
forecasted rain event.

GIVE IT 48 HOURS
Know Your Irrigation
System and Landscape:

Different types of grass and plants have differing
water needs. This also changes throughout the
year, with cooler months typically requiring less
water than warmer months. Ask your landscape
maintenance provider or contact the University
of California Cooperative Extension Master
Gardeners* for questions regarding landscape
watering needs.

WATER BY PLANT TYPE AND SEASON
Adjusting your watering schedule when it rains
prevents unnecessary watering that can lead
to runoff. Keep an eye on the weather forecast
and skip your normal watering schedule
before, during, and after a rain to help keep our
waterways clean and your landscaping looking
its best.

RAIN SKIP
Running multiple, shorter cycles with an hour
break in between allows the water to infiltrate
into the ground so it does not run off.

CYCLE AND SOAK

LEAST TOXIC FIRST
Limit pesticide use by using nonchemical
methods, integrated pest management, or leasttoxic pesticides whenever possible. Contact the University of California Cooperative Extension
Master Gardeners* for alternative suggestions
and related guidance.
1840
Proper Maintenance of
Landscapes
& GARDENS
To Protect our waterways
Who is H2OC?
H2OC is YOU! H2OC is also a
cooperative stormwater program
which includes all 34 cities in Orange
County, the County of Orange,
and Orange County Flood Control
District (OCFCD). Clean and healthy
beaches, creeks, rivers, bays,
wetlands, and ocean are important
to Orange County. H2OC provides
resources to residents and businesses
to encourage personal action and
prevent polluted runoff from entering
our waterways.

Join Us
Contact
Visit h2oc.org to learn more about runoff,
water pollution, and how you can be the
solution to runoff pollution and protect our
water resources.
24-hour Pollution Reporting Hotline:
1-877-89-SPILL (1-877-897-7455)
24-hour Reporting Website:
myOCeServices.ocgov.com
For emergencies, dial 911
Unlike water in sanitary sewers (from sinks
and toilets), water in storm drains is not
treated or cleaned before entering our
waterways and should never contain any
pollutants. Landscaping and gardening can
generate a variety of waste products which
can become pollutants like dirt, fertilizers,
pesticides, green waste (grass clippings,
prunings, branches), and other harmful
substances. If not properly managed, these
pollutants can be transported to Orange
County’s creeks, rivers, and ocean through our
storm drain system.

MAINTAINING

YOUR PROPERTY
*mwdoc.com/rebates
**oclandfills.com/hazardous
□
I
, / I_ i_ (
' .
\ ) \ .\ ~
' }
11 i
I cl.P ',
•';i, ,,,. ,/ t~· II

STORHWATER PROGRAM
\
. \' \
\,:;·
.. ,
'
1/
~. ~ "' ii . .,, ,.
. ,;.. ,.,..· .,. ",
1841

BEST MANAGEMENT

PRACTICES

THANK YOU FOR PROTECTING OUR
WATERWAYS FROM RUNOFF POLLUTION.

Landscaping
• Regularly inspect your sprinkler system for
runoff and leaks and fix immediately. Check
backup battery and adjust system regularly.
• Use smart irrigation controllers, drip irrigation,
soaker hoses, high-efficiency sprinkler nozzles,
or micro spray systems. Check with your local
water agency or the Municipal Water District
of Orange County (MWDOC) for currently
available rebates.*
• Hand water your landscape to
reduce overwatering.
• Cover bare soil with groundcover or mulch to
prevent erosion and reduce runoff.
• Check the weather forecast and refrain from
watering or using chemicals like fertilizers
and pesticides 48 hours before or after rain
is predicted.
• Sweep hardscapes and rinse patio furniture on
permeable surfaces to prevent runoff.

Gardening
• Use integrated pest management (IPM) to
target specific pests in problem areas instead
of widespread chemical use.

Runoff of anything other than clean rainwater is
prohibited from entering the storm drain system.

Here’s what you can do while maintaining your yard
and garden to protect our creeks, rivers, and ocean.

For more on waterway-safe landscaping and gardening, please visit https://h2oc.org/resources/pollution-prevention-for-residents/lawn-and-garden-care/ or scan the QR code. • If pesticides or herbicides are necessary, follow
the manufacturer’s instructions on the label.
• Plant OC Garden Friendly plants to reduce
the amount of water, fertilizers, and
pesticides needed.

Containment
• Protect stockpiles and materials from wind and
rain by storing them under tarps or secured
plastic sheeting.
• Bulk deliveries of landscape materials such
as mulch and soil, should be delivered to
driveways and covered with a tarp.
• Store chemicals indoors or in a dry and
covered area.

Proper Disposal
• Sweep up solid waste spills immediately. If the
spill is liquid, apply an absorbent material then
sweep it and dispose of it properly.
• Take unwanted pesticides, fertilizers, and
herbicides to a Household Hazardous Waste
Collection Center.**
• Dispose of green waste by composting it or
placing in your organics waste bin.
1842
Water Quality Management Plan (WQMP)

Presidio

Attachment B: CALCULATIONS AND EXHIBITS
1843
30251 GOLDEN LANTERN,
SUITE E, PMB 251
LAGUNA NIGUEL, CA 92647
(866) 338-5778 PHONE
DRAINAGE AREA 1

3.16 AC
DRAINAGE AREA 2

0.35 AC
DRAINAGE AREA 3

0.26 AC
DRAINAGE AREA 4

0.79 AC
----1
-==
J
80 40 0 80 160 240
~I~~ I __ II
SCALE: 1"=80'

TOTAL AREA
~t-.~=.·;•=.,:·,.-i·,:=:..::j TOT AL PER VI OU S AR EA
% PERVIOUS
% IMPERVIOUS
DRAINAGE AREA 1
~t·:-:-=,·;•=.;:,,.-i·t=:..::-J TOTAL PERVIOUS AREA
% PERVIOUS
% IMPERVIOUS
DRAINAGE AREA 2
..-.t.,~=:;7=.,:-,.=;.,:=:..::-J TOTAL PERVIOUS AREA
% PERVIOUS
% IMPERVIOUS
DRAINAGE AREA 3
~t-,.~=.·;•=.,:·,.-i·,:=:..::-J TOT AL PER VI OU S AR EA % PERVIOUS
% IMPERVIOUS
DRAINAGE AREA 4
~t·:-:-=:;7=.~:-,.-;.,:=:..::j TOT AL PER VI OU S AR EA % PERVIOUS
% IMPERVIOUS

ADVANCED

CIVIL GROUP

4.56 AC

2.45 AC
53 %
47 %

3.16 AC

1.21 AC
38 %
62 %

0.35 AC

0.31 AC
89 %
11 %

0.26 AC

0.24 AC
92 %
8 %

0. 79 AC

0.69 AC
87 %
13 %
ADVANCED CIVIL GROUP INC.

WWW.ADVANCEDCIVILGROUP .COM
R.C .E. NO. 68795
DA TE 3/31/2026

PERVIOUS AREA

EXISTING CONDITION
15 ARGONAUT

ALISO VIEJO
1844
//
// DW
DW
DW
DW
DW
DW
DW

DW DW DW DW DW DW DW
SS
SS
SS
SS
SS
SS
SS

SS SS SS SS SS
SS

SS SS SS SS SS SS SS SS SS
DW
30251 GOLDEN LANTERN,
SUITE E, PMB 251
LAGUNA NIGUEL, CA 92647
(866) 338-5778 PHONE
DRAINAGE AREA 1

3.16 AC
DRAINAGE AREA 2

0.35 AC
DRAINAGE AREA 3

0.26 AC
DRAINAGE AREA 4

0.79 AC
80 40 0 80 160 240
I r,,zj...1------~-'~I ~'!_'!_'!__IC\----~1
SCALE: 1''= 80'

TOTAL AREA
~f ...~:: :--::,,~:-::] fOT AL PERVIOUS AREA
% PER VI OUS
% IMPERVIOUS
DRAI NAG E AREA 1
~f·:~i:":-,~-,~;:-1 fOT AL PERVIOUS AREA
% PER VIOU S
% IMPERVIOUS
DRAIN AG E AREA 2
r.-.....,,,; . ..,-"""";S,,.,,.,,,~-:;=~·-1 TOT AL PERVIOUS AREA % PERVIOUS
% IM PER VIOUS
DRAINAGE AR EA 3
f~.,..,.~;t,:-,.i·,~~-::j TO TAL PER VI OUS AREA
% PERVIOUS
% IM PERVIOUS
DRAINAGE AREA 4
~t-,-.,·~;z.~:-,.~-,~-~-::j TOTAL PERVIOUS AR EA
% PERVIOUS
% IMPERVIOUS

ADVANCED

CIVI L GROUP

4. 56 AC

2. 36 AC
52 %
48 %

3.1 6 AC

1.12 AC
3 5 %
6 5 %
0 .3 5 AC
0 .31 AC
89 %
11 %

0.2 6 AC

0.24 AC
9 2 %
8 %

0.79 AC

0.69 AC
8 7 %
13 %
ADVANCED CIVIL GROUP INC.

WWW.ADVANCEDCIVILGROUP.COM
R.C.E. NO. 68795
DA TE 7/8/2026

PERVIOUS AREA

PROPOSED CONDITION
15 ARGONAUT

ALISO VIEJO
1845
460.00 FL
DRAINAGE AREA 1

3.16 AC
LENGTH = 522 LF
SLOPE = 0.009
DRAINAGE AREA 2

0.35 AC
DRAINAGE AREA 3

0.26 AC DRAINAGE AREA 4 0.79 AC
LENGTH = 202 LF
SLOPE = 0.146
489.50 FL
462.00 FL
489.20 FL
LENGTH = 147 LF
SLOPE = 0.185
461.00 FL
LENGTH = 302 LF
SLOPE = 0.093

ARGONAUT

GLENWOOD DRIVE

ALISO CREEK ROAD
456.50
INV
461.00
FL
EXISTING HYDROLOGY EXHI Bl T

IN THE CITY OF ALISO VIEJO,

COUNTY OF ORANGE, STATE OF CALIFORNIA
))1111'1~ ,-.\\,
\\
\
~
PROPERTY ADDRESS=
15 ARGONAUT
ALISO VIEJO, CA 92656
DRAINAGE AREA=

OMA (AC)
1 3.16
2 0.48
3 0.30
4 0.79
LEGEND:
- > - > - FLOW PA TH
- - - - - DRAINAGE BOUNDARY
0 [XJ
II
w
_J
<(
u
CJl
80 40 O 80 160 240
I ~1-----1~~1 I
SCALE: 1"=80'
1846
DW
DW
DW
DW
DW
DW
DW

DW DW DW DW DW DW DW
SS
SS
SS
SS
SS
SS

DW DW DW
DW
SS

SS SS SS SS SS SS SS SS SS SS SS SS

DW DW DW DW SS SS SS DW DW
DW

DW DW DW

SS SS SS SS SS SS SS
DW DW
SS SS

DW DW SS SS
SS
SS
DW
SS DW

SD SD SD SD SD SD
SD

SD SD SD SD
DW
SD SD
//
// 460.00 FL
DRAINAGE AREA 1

3.16 AC
LENGTH = 531 LF
SLOPE = 0.017
DRAINAGE AREA 2

0.35 AC
DRAINAGE AREA 3

0.26 AC DRAINAGE AREA 4 0.79 AC
LENGTH = 202 LF
SLOPE = 0.146
489.50 FL
462.00 FL
489.20 FL
LENGTH = 147 LF
SLOPE = 0.185
461.00 FL
LENGTH = 302 LF
SLOPE = 0.093

ARGONAUT

GLENWOOD DRIVE

ALISO CREEK ROAD
451.50
INV
460.81
FS

PROPOSED HYDROLOGY EXHIBIT

IN THE CITY OF ALISO VIEJO,

COUNTY OF ORANGE, STATE OF CALIFORNIA
PROPERTY ADDRESS:
15 ARGONAUT
ALISO VIEJO, CA 92656
DRAINAGE AREA=
OMA
1 2
3 4
LEGEND:
(AC)

3.16 0.48

0.30 0. 79
->->- FLOW PATH
- - - - - DRAINAGE BOUNDARY
0 CX)
II
w
_J
<(
u
lf)
80 40 O 80 160 240
I ~1-----1~~~~!----I --1
SCALE: 1"=80'
1847
DW DW
DW DW
DW
DW
DW
DW
DW
DW
DW

DW DW DW DW DW DW

DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW
SS
SS
SS
SS
SS
SS

SS SS SS SS SS SS SS SS

DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW

DW DW DW DW DW
SS SS
DW

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

DW DW DW DW DW DW DW DW DW DW DW DW DW SS SS SS SS SS SS SS SS DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW

SS SS SS SS SS SS

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

DW DW DW DW DW DW DW

SS SS SS SS SS SS SS

DW DW DW DW DW DW SSDWSS SS SS SS SS SS SS SS SS SS SS
SS
DW
DW
DW
DW
DW
SS

SS SS SS SS SS SS

DW DW DW DW
DW DW
SD

SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD

SD SD SD SD
SD
SD

SD SD SD

SD SD SDSD SD SD SD SD SD SD SD SD SD SD DW
DW

DW DW DW
SD

SD SD SD SD SD SD

SD DW SD SD SD SD SD SD
I"(
,,
,,
1i
,1
I
r7
I ,,,'" ' ' ,,' '
·-1/
i -"-
I
I
I
• r•1
I I
I
I
'• I
"·· '
I
I
I
I I
r
r'
J
I
}
I
I I
I
I
I .. r i " "" ' W ' ' W··
g
en
:::;
r
r
/
,r "I/
/
••
I
' i
' ',
' -,
k;:• ' I ' I
I I
g
C
'
I (
( . .
; 1
/
I
I
' ' I ,: ' ' I I I I '

WQMP SITE PLAN

IN THE CITY OF ALISO VIEJO

COUNTY OF ORANGE, STATE OF CALIFORNIA
-L_
-
j --+
' --I-
-
-
--
'
'
---,I
GL£Nwoo ' 'i
i
-i ' ·'
• '
----
r
I
---
--J--
- i ' I
--
~:_-~ t=-__ -~-R:,,<=,,C
Ji I
' ' !
@
' '
' I
RA.I, INL~
m, ®
•
Cl
en
w--
Q'.

0..

STD M 'DRAIN CHA BER - • --- ,·
® ®
--
I llll I ,§ • '" !:~
• •
llll llll
•
-
--~~¾ ,:;;;; ~-=-~'= ---·~
-
--
---
"I®-
r•,_,•- '
' ' '· :~·@o '' I_,
@
®
~RAl® T

W/ FILTER
n· ·~---
5_\
µ.. 1·
<-·,
, ;, __. - - _ rr
--~-I r / FILlER
@ "I •
llll
@ • @
@
r RESIDIO LANE"

D AJN INLET
~ NL.ET r'
W/ FILlER --;--....._
-f------<Sle- STORM 6RAIN FOR
'i>E~LO~~D AREA RUNOFF

ISCHARGES
_
JQ_ BIOFILTER
• 53
•
"--' ®
' -,-
®
@ !, J I
i '
I
/)
' STORt.f' ORAIN PUMP FOR
\ _l,,fJ,'}\ HILLSIDE -~NOFF
•RM DRAIN
D{i)N

W/ FILTE

UNDER SID -
,
ff ff ff 'FPff fi~· ·;
'-
\ (j
' <
\:_ ~1J, ; , '\ (.!) I
"-•\,_._\,,-~ /i t. ,r}'"-,~·1•1 r .- . .

ARGONAUT
'i
-
i
PROPERTY ADDRESS=
15 ARGONAUT
ALISO VIEJO, CA 92656
30 15 0 30 60 90 l~~f-----1
__
1-----'I
SCALE: 1''=30'
1848
0 ~ 0
c
.5
-
0 L
1000
900
500
400
350
300
250
200
150
100
...
i
E
Q,
0 -;
i
-0
...
.e.

Ill
Q)
!;
C
E
.5
C
0 ;
0 ...
c
g
0 u
Q)
E
.=
LIMITATIONS=
I. Maximum length = 1000 Feet

2. Maximum area = 10 Acres
...

C
Q) . !
(/)
~
li
K
Undeveloped
Good Cover
Undeveloped
Fair Cover
Undeveloped
Poor Cover
Commercial
~ Q) rs..-0 .. - Cl-Ill
0 -0 ,._ C i Q)
~ C
Q) Q)

0.. Q)
-::--3
p• Q) .!l ..Q
0 0
100
80 60
40 30
20 10
8 6
;~
2 14 (Paved) KEY
L-H-Tc-K-Tc' 13 /
12 ,i." / 11/ C
10 9
8 7
6 5
4 eL Development
80- Apartment
75- Mobile Home
65- Condominium
60- Single Fomily-5,000 ft 2 Lot
40- Single Family-1/4 Acre Lot
20- Single Family- I Acre Lot
15 - Developed Open Space
10 - Single Family-21/2 Acre Lot
EXAMPLE:
(I) L= 5501
, H=5.01, K=Slngle Family (5-7 DU/AC}
Development, Tc=l2.6 min.
(2) L= 550., H= 5.0', K= Commercial
Development, Tc=9.7 min.

Tc
5 (min)
6 7
8 9
10 I I
25 30
35 40
::-
E
0 LL
...
0 -
.s
.....
u
....
-
C
0 "ij
...
-
C
B
C
0 u
-
0 Q)
E
I=
---------------------1
ORANGE COUNTY.

HYDROLOGY MANUAL

TIME OF CONCENTRATION

NOMOGRAPH

FOR INITIAL SUBAREA
D-4 Figure D-I 1849

TECHNICAL GUIDANCE DOCUMENT APPENDICES
III-13 December 20, 2013
Figure III.4. Capture Efficiency Nomograph for Off-line Flow-based Systems in Orange County 100%
-
90% ~
u
C: 80% Cl)
u
:E 70% w
Cl)
I...
:::, 60% +,I
C.
(ti
(j 50%
(ti
:::,
C: 40%
C:
<(
Cl) 30%
C)
(ti
I...

Cl) 20% >
<(
10%
--- - - ~ ~ ~ = - J ............ ~ ~ ~ :.---- V-~ ~ ~ ::::::-~- ,/ _,,,.. ~ ~ ~ V"'
/
/4 ~ -
v ,,
/ i,'
h , : II' ,'
,
, - Tc >= 60 minutes
1/1: i, ,,'
-
~ Tc= 30 minutes
I
M ~ ',' ~ Tc= 20 minutes -
,, 6 6 ~ Tc= 10 minutes - j , , I
,, , - Tc <= 5 minutes ~ ~'/ - ,, ----Extrapolated Data I 0% I I I I I I I

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40
Design Intensity, in/hr
1850

TECHNICAL GUIDANCE DOCUMENT APPENDICES
South Orange County Version E-49 September 28, 2017
E.3.5.4 Worksheet for Using the Flow-Based Compact Biofiltration with Supplemental Retention Method for Sizing Compact Biofiltration BMPs
Worksheet 9: Flow-Based Compact Biofiltration with Supplemental Retention Method Part 1: Determine the design storm intensity of the compact biofiltration BMP 1 Enter the time of concentration, Tc (min) (See E.2.3) (account for upstream detention by increasing Tc to a
maximum 60 minutes per Section E.3.5.2 if detention is
provided)
Tc= min
2 Using Figure E-7 or the figure included in the worksheet, determine the design intensity at which the estimated
time of concentration (Tc) achieves 80% capture
efficiency, I1
I1= in/hr
3 Enter capture efficiency corresponding to upstream
HSCs and/or upstream BMPs, Y2. Attach associated
calculations.

Y2 = %
4 Using Figure E-7, determine the design intensity at
which the time of concentration (Tc) achieves the
upstream capture efficiency(Y2), I2
I2= in/hr
5 Determine the design intensity that must be provided by BMP to achieve 80 percent capture, Idesign= I1-I2
Idesign_80%
=
in/hr
Part 2: Calculate the design flowrate of the compact biofiltration BMP (Section E.2.6) 6a Enter DMA area tributary to BMP (s), A (acres) A= acres 6b Enter DMA Imperviousness, imp (unitless) imp=
6c Calculate runoff coefficient, c= (0.75 x imp) + 0.15 c= 6d
Calculate flowrate to achieve 80 percent capture, Q80%= (c x Idesign x A) Q80%= cfs
7 Calculate design flowrate, Qdesign= Q80% x 150% Qdesign= cfs Part 3: Demonstrate that Supplemental Retention BMPs Conform to Volume Reduction Targets (Only DMAs Categorized as “Biotreatment with Partial Infiltration”) 8 Describe system, including features to maximize volume reduction (if applicable):
9 Summarize calculations to demonstrate that volume reduction targets are met, where feasible and applicable.
1851

PLAN VIEW

ELEVATION VIEW RIGHT END VIEW

STANDARD DETAIL

STORMWATER BIOFILTRATION SYSTEM
MWS-L-8-16-V

FOR PATENT INFORMATION, GO TO
www.ContechES.com/IP

LEFT END VIEW

INSTALLATION NOTES

SITE SPECIFIC DATA

PROJECT NUMBER

PROJECT NAME

PROJECT LOCATION

STRUCTURE ID

TREATMENT REQUIRED
TREATMENT FLOW {CFS}
PRETREATMENT LOADING RATE {GPM/SF}
WETLAND MEDIA LOADING RATE {GPM/SF}
PEAK BYPASS REQUIRED {CFS} - IF APPLICABLE
PIPE DATA I.£ MATERIAL DIAMETER
INLET PIPE 1
INLET PIPE 2

OUTLET PIPE

PRETREATMENT BIOFILTRA TION DISCHARGE

RIM ELEVATION

SURFACE LOAD
NOTES:

1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS

AND INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE

SYSTEM AND APPURTENANCES IN ACCORDANCE WITH THIS
DRAWING AND THE MANUFACTURER's SPECIFICATIONS, UNLESS
OTHERWISE STATED IN MANUFACTURER'S CONTRACT.

2. UNIT MUST BE INSTALLED ON LEVEL BAS£ MANUFACTURER
RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS
SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS

RESPONSIBLE FOR VERIFYING PROJECT ENGINEER'S
RECOMMENDED BASE SPECIFICATIONS.

3. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL
CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE
SURFACE OF CONCRETE {PIPES CANNOT INTRUDE BEYOND
FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH
DISCHARGE CHAMBER FLOOR. ALL PIPES SHALL BE SEALED
WATERTIGHT PER MANUFACTURER'S STANDARD CONNECTION DETAIL.

4. CONTRACTOR RESPONSIBLE FOR CONTACTING CONTECH FOR
ACTIVATION OF UNIT. MANUFACTURER'S WARRANTY JS VOID

WITHOUT PROPER ACTIVATION BY A CONTECH REPRESENTATIVE

5. VERTICAL HEIGHT VARIES BASED ON SITE SPECIFIC
REQUIREMENTS.

WETLANDMEDIA
BED

PATENTED

PERIMETER

VOID AREA
C/L

OPTIONAL

CURB INLET
C/L
DRAIN

DOWN LINE

VERTICAL

UNDERDRAIN

MANIFOLD
RIM/FG
VEGETATION ~
PLANT

ESTABLISHMENT
MEDIA
,.........,ftiiei.r5i,i.m1------'---,..---.,.,
-----e·-o·-----

BYPASS OVERFLOW WEIR

FLOW CONTROL RISER
IE OUT
------------16'-o·-----------
PROPRIETARY AND CONFIDENTIAL:

TH£ INFORMATION CONTNNED IN THIS DOCUMENT IS TH£ SOL£
PROPERTY OF CONTECH ANO ITS COMPANIES. THIS DOCUMENT,
NOR ANY PART THEREOF, MAY 8£ US£D, R£PROOUC£D OR MODIFIED IN ANY MANNER WITH OUT TH£ WRITT£N CONSENT OF CONTECH.

C( 1jNTECH®

ENGINEERED SOLUTIONS LLC
www.ContachES.com
IE IN
1852
ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS PLEASE NOTE:

1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".

2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.

3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS.

4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.

5. WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".

NOTES:

1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 45x76 DESIGNATION SS.

2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".

3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. REFERENCE STORMTECH DESIGN MANUAL FOR BEARING CAPACITY GUIDANCE.

4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.

5. REQUIREMENTS FOR HANDLING AND INSTALLATION: · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.

MATERIAL LOCATION DESCRIPTION

AASHTO MATERIAL

CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
D
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C'

LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.

CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A
PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED

INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
PREPARATION REQUIREMENTS.

C
INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER.

GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE.

MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER.

AASHTO M145¹ A-1, A-2-4, A-3
OR
AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER
THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN
12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR
PROCESSED AGGREGATE MATERIALS.

B
EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE.

CLEAN, CRUSHED, ANGULAR STONE

OR RECYCLED CONCRETE
5 AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57
A
FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.

CLEAN, CRUSHED, ANGULAR STONE

OR RECYCLED CONCRETE
5 AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 NO COMPACTION REQUIRED.
45"
(1140 mm)
18"
(450 mm) MIN*
8'
(2.4 m)
MAX
77" (1950 mm) 12" (300 mm) MIN
12" (300 mm) MIN
6"
(150 mm) MIN
9" (230 mm) MIN
(SEE NOTE 3)
D
C
B
A
*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED

INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 24" (600 mm).
6" (150 mm) MIN

PERIMETER STONE
(SEE NOTE 4)

EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
MC-3500

END CAP SUBGRADE SOILS
(SEE NOTE 3)

PAVEMENT LAYER (DESIGNED

BY SITE DESIGN ENGINEER)
**THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.

PLEASE SEE THE LAYOUT SHEET(S) FOR
PROJECT SPECIFIC REQUIREMENTS.

ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL

AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
PART # STUB B C
MC3500IEPP06T
6" (150 mm) 33.21" (844 mm) --- MC3500IEPP06B --- 0.66" (17 mm) MC3500IEPP08T
8" (200 mm) 31.16" (791 mm) --- MC3500IEPP08B --- 0.81" (21 mm) MC3500IEPP10T
10" (250 mm) 29.04" (738 mm) --- MC3500IEPP10B --- 0.93" (24 mm) MC3500IEPP12T
12" (300 mm) 26.36" (670 mm) --- MC3500IEPP12B --- 1.35" (34 mm) MC3500IEPP15T
15" (375 mm) 23.39" (594 mm) --- MC3500IEPP15B --- 1.50" (38 mm) MC3500IEPP18TC
18" (450 mm)

20.03" (509 mm) --- MC3500IEPP18TW
MC3500IEPP18BC
--- 1.77" (45 mm) MC3500IEPP18BW
MC3500IEPP24TC
24" (600 mm)

14.48" (368 mm) --- MC3500IEPP24TW
MC3500IEPP24BC
--- 2.06" (52 mm) MC3500IEPP24BW
MC3500IEPP30BC 30" (750 mm) --- 2.75" (70 mm)

NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³)
MINIMUM INSTALLED STORAGE* 175.0 CUBIC FEET (4.96 m³)
WEIGHT 134 lbs. (60.8 kg)

NOMINAL END CAP SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH) 75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³)
MINIMUM INSTALLED STORAGE* 45.1 CUBIC FEET (1.28 m³)
WEIGHT 49 lbs. (22.2 kg)
*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION
NTS

90.0" (2286 mm)

ACTUAL LENGTH

86.0" (2184 mm)

INSTALLED

BUILD ROW IN THIS DIRECTION
NOTE: ALL DIMENSIONS ARE NOMINAL

LOWER JOINT

CORRUGATION
WEB
CREST
CREST

STIFFENING RIB
VALLEY

STIFFENING RIB
B
C

75.0"
(1905 mm)

45.0"
(1143 mm)

25.7"
(653 mm)
FOOT

77.0"
(1956 mm)

45.0"
(1143 mm)
STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C"
END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"

UPPER JOINT CORRUGATION

22.2"
(564 mm)

INSTALLED

CUSTOM PRECORED INVERTS ARE
AVAILABLE UPON REQUEST.

INVENTORIED MANIFOLDS INCLUDE
12-24" (300-600 mm) SIZE ON SIZE
AND 15-48" (375-1200 mm)
ECCENTRIC MANIFOLDS. CUSTOM
INVERT LOCATIONS ON THE MC-3500

END CAP CUT IN THE FIELD ARE NOT

RECOMMENDED FOR PIPE SIZES
GREATER THAN 10" (250 mm). THE

INVERT LOCATION IN COLUMN 'B'

ARE THE HIGHEST POSSIBLE FOR
THE PIPE SIZE.

PART # STUB B C
MC3500IEPP06T
6" (150 mm) 33.21" (844 mm) --- MC3500IEPP06B --- 0.66" (17 mm) MC3500IEPP08T
8" (200 mm) 31.16" (791 mm) --- MC3500IEPP08B --- 0.81" (21 mm) MC3500IEPP10T
10" (250 mm) 29.04" (738 mm) --- MC3500IEPP10B --- 0.93" (24 mm) MC3500IEPP12T
12" (300 mm) 26.36" (670 mm) --- MC3500IEPP12B --- 1.35" (34 mm) MC3500IEPP15T
15" (375 mm) 23.39" (594 mm) --- MC3500IEPP15B --- 1.50" (38 mm) MC3500IEPP18TC
18" (450 mm)

20.03" (509 mm) --- MC3500IEPP18TW
MC3500IEPP18BC
--- 1.77" (45 mm) MC3500IEPP18BW
MC3500IEPP24TC
24" (600 mm)

14.48" (368 mm) --- MC3500IEPP24TW
MC3500IEPP24BC
--- 2.06" (52 mm) MC3500IEPP24BW
MC3500IEPP30BC 30" (750 mm) --- 2.75" (70 mm)

NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³)
MINIMUM INSTALLED STORAGE* 175.0 CUBIC FEET (4.96 m³)
WEIGHT 134 lbs. (60.8 kg)

NOMINAL END CAP SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH) 75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³)
MINIMUM INSTALLED STORAGE* 45.1 CUBIC FEET (1.28 m³)
WEIGHT 49 lbs. (22.2 kg)
*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION
NTS

90.0" (2286 mm)

ACTUAL LENGTH

86.0" (2184 mm)

INSTALLED

BUILD ROW IN THIS DIRECTION
NOTE: ALL DIMENSIONS ARE NOMINAL

LOWER JOINT

CORRUGATION
WEB
CREST
CREST

STIFFENING RIB
VALLEY

STIFFENING RIB
B
C

75.0"
(1905 mm)

45.0"
(1143 mm)

25.7"
(653 mm)
FOOT

77.0"
(1956 mm)

45.0"
(1143 mm)
STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C"
END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"

UPPER JOINT CORRUGATION

22.2"
(564 mm)

INSTALLED

CUSTOM PRECORED INVERTS ARE
AVAILABLE UPON REQUEST.

INVENTORIED MANIFOLDS INCLUDE
12-24" (300-600 mm) SIZE ON SIZE
AND 15-48" (375-1200 mm)
ECCENTRIC MANIFOLDS. CUSTOM
INVERT LOCATIONS ON THE MC-3500

END CAP CUT IN THE FIELD ARE NOT

RECOMMENDED FOR PIPE SIZES
GREATER THAN 10" (250 mm). THE

INVERT LOCATION IN COLUMN 'B'

ARE THE HIGHEST POSSIBLE FOR
THE PIPE SIZE.

INSPECTION & MAINTENANCE
STEP 1) INSPECT ISOLATOR ROW PLUS FOR SEDIMENT
A. INSPECTION PORTS (IF PRESENT)
A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN
A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED
A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.

B. ALL ISOLATOR PLUS ROWS
B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.

STEP 2) CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.

STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.

NOTES

1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.

2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.

MC-3500 ISOLATOR ROW PLUS DETAIL
NTS
24" (600 mm) HDPE ACCESS PIPE REQUIRED USE

FACTORY PRE-CORED END CAP
PART #: MC3500IEPP24BC OR MC3500IEPP24BW

STORMTECH HIGHLY RECOMMENDS

FLEXSTORM INSERTS IN ANY UPSTREAM

STRUCTURES WITH OPEN GRATES
COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE MC-3500 CHAMBER OPTIONAL INSPECTION PORT MC-3500 END CAP
ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN

FOUNDATION STONE AND CHAMBERS

8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS

SUMP DEPTH TBD BY

SITE DESIGN ENGINEER
(24" [600 mm] MIN RECOMMENDED)
INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE
PART #: MCFLAMP

MC-SERIES END CAP INSERTION DETAIL
NTS
NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL
FOR A PROPER FIT IN END CAP OPENING.

MANIFOLD HEADER

MANIFOLD STUB

STORMTECH END CAP

MANIFOLD HEADER

MANIFOLD STUB
12" (300 mm)

MIN SEPARATION
12" (300 mm) MIN INSERTION
12" (300 mm)

MIN SEPARATION
12" (300 mm)
MIN INSERTION StormTech
® Chamber System DATE: 07/08/2026 DRAWN: CK PROJECT #: CHECKED: N/A REV: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS/STORMTECH UNDER THE DIRECTION OF THE PROJECT’S ENGINEER OF RECORD (“EOR”) OR OTHER PROJECT REPRESENTATIVE. THIS DRAWING IS NOT INTENDED FOR USE IN BIDDING OR CONSTRUCTION WITHOUT THE EOR’S PRIOR APPROVAL. EOR SHALL REVIEW THIS DRAWING PRIOR TO BIDDING AND/OR CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE EOR TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. WWW.ADSPIPE.COM PRESIDIO ALISO VIEJO, CA, USA SHEET
1 1OFNOT TO SCALE

ISOLATOR ROW PLUS
(SEE DETAIL)

NO WOVEN GEOTEXTILE

BED LIMITS

CONCEPTUAL ELEVATIONS
MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED): 12.50 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC): 6.50
MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC): 6.00
MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT): 6.00 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT): 6.00 TOP OF STONE: 5.50
TOP OF MC-3500 CHAMBER: 4.50
24" ISOLATOR ROW PLUS INVERT: 0.92
BOTTOM OF MC-3500 CHAMBER: 0.75
BOTTOM OF STONE: 0.00

PROPOSED LAYOUT
40 STORMTECH MC-3500 CHAMBERS
2 STORMTECH MC-3500 END CAPS
12 STONE ABOVE (in)
9 STONE BELOW (in)
40 STONE VOID
8070

INSTALLED SYSTEM VOLUME (CF)
(PERIMETER STONE INCLUDED)
(COVER STONE INCLUDED)
(BASE STONE INCLUDED)
2461 SYSTEM AREA (SF)
601.6 SYSTEM PERIMETER (ft)
DESCRIPTION INVERT* MAX FLOW

ITEM ON

LAYOUT PART TYPE
24" BOTTOM PRE-CORED END CAP, PART#: MC3500IEPP24BC / TYP OF ALL 24" BOTTOM

CONNECTIONS AND ISOLATOR PLUS ROWS

PREFABRICATED END CAP A
FLAMP B INSTALL FLAMP ON 24" ACCESS PIPE / PART#: MCFLAMP

CONCRETE STRUCTURE C (DESIGN BY ENGINEER / PROVIDED BY OTHERS) • NOT FOR CONSTRUCTION: THIS LAYOUT IS FOR DIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIRED STORAGE VOLUME CAN BE ACHIEVED ON SITE.

NOTES
• THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. *INVERT ABOVE BASE OF CHAMBER
A
C
B 6.42'
290.37' 8.42'
292.37'
1 MC-3500 CROSS SECTION DETAIL
2 MC-3500 TECHNICAL SPECIFICATION
3 MC-3500 ISOLATOR ROW PLUS DETAIL

SPACE INTENTIONALLY LEFT BLANK

SPACE INTENTIONALLY LEFT BLANK

SPACE INTENTIONALLY LEFT BLANK
4 MC-SERIES END CAP INSERTION DETAIL
~
1 i
~
/ ~ = '2,/--
\_,j ~
I
_[__
0 L
1853

ORANGE COUNTY

RIVERSIDE COUNTY

ORANGE COUNTY

SAN BERNARDINO COUNTY

ORANGE COUNTY

LOS ANGELES COUNTY

ORANGE COUNTY

ORANGE COUNTY

LOS ANGELES COUNTY LOS ANGELES COUNTY

1.05 0.7

0.95 1

0.9 0.85

0.8 0.75

0.7 0.65

0.95 0.7

0.9 0.9

0.75 P:\9526E\6-GIS\Mxds\Reports\InfiltrationFeasability_20110215\9526E_FigureXVI-1_RainfallZones_20110215.mxd FIGURE JOB TITLE SCALE 1" = 1.8 miles DESIGNED

DRAWINGCHECKED
BMP
04/22/10
DATEJOB NO.

THTH9526-E

ORANGE COUNTY

TECHNICAL GUIDANCE

DOCUMENT
ORANGE CO. CA

RAINFALL ZONES

SUBJECT TO FURTHER REVISION
03 1.8 .6 7.2
Miles
0 61 3 2
Kilometers
LEGEND
Orange County Precipitation Stations
24 Hour, 85th Percentile Rainfall (Inches)
24 Hour, 85th Percentile Rainfall (Inches) - Extrapolated City Boundaries
Rainfall Zones
Design Capture Storm Depth (inches)

0.65"

0.7 0.75

0.80 0.85

0.90 0.95

1.00 1.10"
Note: Events defined as 24-hour periods (calendar days) with greater than 0.1 inches of rainfall.

For areas outside of available data coverage, professional judgment shall be applied.

XVI-1
~ an nS
Ro.1 • lilll:=.: -1 v. -- Pa r11m o 1.m t :&
B,ellnowet
Lake
Hawanain
Li
0 ~, B
0 --
" ..
e
~ ..
.,.

E:>st 1a
J-• Mirada
J9
"' tt
l
z
La Habra
r,i I)!
I
I
I
I
..

Fullerton
,.,i,i1netr
Gar den G 'lllte
T
'
E.lt$il\yt
~
i
• R
:ll'
CoGt ~ M e .,
.........

Ce 11'1 •
E Warnu.Ay
"'
j
~ wp,o r. c..oa 1
.l\
Jo b.11 Cltlll&--_..J
1 '
Pacific
Ocean
oChlno HIii•
" u CI I •
"
m
s
-;,
r
Cllru1 St
0 LJ
CJ
CJ
CJ
CJ
CJ
CJ
1111
1111
J,uf'\l'93 ve Jurvpa Ave
Clev.1-.,d
N:IIUaNll
Far ~l
:r.
;
!
,;
~
5 "'
"'
•
i
"
Ma
ve
ak~ El•lnoreOWll d<>
,,. c•"""'
'If ~· j
i
C
o
Cl ;,• lid
!J. ,._.,
"
...
"%
1854
Conventional Biotreamtent Sizing Calculation
South Orange County WQMP TGD
E.3.3.1 Biofiltration Routing Method Stepwise Instructions for Sizing Biofiltration BMPs

1. Determine 85th Percentile, 24-Hour Design Storm
85th Percentile, 24-Hour Storm 0.80 in
Area 3.16 ac

2. Reduce design storm depth based on upstream HSCs
HSC-1: Not applicable due to the lack of infiltration potential at the site.

HSC-2: Not applicable due to the lack of infiltration potential at the site.

HSC-5: Not feasible due to the significant cost impacts to the project.

HSC-6: Not applicable due to the lack of infiltration potential at the site.

3. Convert the remaining design storm to a runoff volume E.2.2 Runoff Volume
V=C x d x A x 43560 sf/ac x 1/12 in/ft
Impervious Ratio 65 %
C=0.75 x imp + 0.15 0.64
Volume 5850 ft3

4. Select a BMP footprint area
Impervious Area 2.04 ac
Target BMP Footprint 1.85 %

0.038 ac
1644 sf
HSC-3: Not feasible because the required 20- to 30-foot tree canopy diameter cannot be achieved within the site constraints.

HSC-4: Not feasible because overflow dispersion requires a minimum 8-foot separation from buildings, which cannot be accommodated by the proposed site layout.

4.5°6
a
" 4.0°6 0
.;; X C:

3.5°6 X 0 e 0 1.2" Design
Storm
] t: 3 0°' A X 0 > II • 'O X X 0 •< ' D 0 X 0 "§ ~ 2.5% A X x - 0 0 X )I( -~ 0 D A X )I( . -~ A X X :;; t 2.0% 0 D D A A A :: ~1.85% -<> D D ·E '= 1.s% ---<> ·--0- ::- $
X 1.1" Design
Storm
0 0 1" Design X X X
X X Storm
A A A 0.9" Design --0 D -<>--- ◊ Storm
o0 1.0°6 t..
.,_ 0 0.8" Design
Storm
:;;
., 0.5% ---◊- 0.7" Design
f." Storm
,_ . 0.0°6
20% 40% 60% 65% 80% 1000,,
Imperviousness of Contributing Area (%)
1855

5. Not applicable since partial infiltration is not feasible

6. Not applicable since partial infiltration is not feasible

7. Select a media depth
Media Depth 24 in
Effective Retention Depth 2.4 in
Volume Retained 329 ft3

8. Calculate remaining portion of DCV
Initial Design Volume 5850 ft3
Volume Retained 329 ft3
Remaining DCV 5521 ft3

9. Multiply reamining DCV by 1.5

1.5x DCV 8282 ft3

10. Calculate Total Effective Biofiltration Storage
Ponding Depth 12 in
Media Depth 24 in
D 16.8 in

11. Calculate the Volume Biofiltered
D 16.8 in
K 2.5 in/hr
A 1644 ft2
T 5 hr
V 3329 ft3

12. Adjust Surface Area until Vtreated is larger than 1.5x DCV in step 9 (8282 ft3) BMP Footprint (Adjusted) 4090 ft2
Media Depth 24 in
Effective Retention Depth 2.4 in
Volume Retained 0 ft3
Ponding Depth 12 in
Media Depth 24 in
D 16.8 in
D 16.8 in
Di.iofiltez_effectiv e = ponding depth+ 0.2 "' media depth V 1m rt,d = (Dbicfilter_eff•etiw + K ,,..sdia * T .,.,,,1) *ABMP_EFF * (1ftl12 inches) D,iofilter_effective = ponding depth + 0.2 "' media depth V t,eated = (Dbiofilter_eff,ctiw + K ..-.sdia .. T .,.,.,1) ""ABMP_EFF .. (1ft/12 inches) 1856
K 2.5 in/hr
A 4090 ft2
T 5 hr
V 8282 ft3
There is insuffcient room on the project site to install a 4,090 ft2 bioretention area. 1857
Water Quality Management Plan (WQMP)

Presidio

Attachment C: HARVEST AND REUSE

DETERMINATION
1858
Design Capture Volume (DCV) Calculation
85th Percentiel, 24-hr Storm Depth 0.8 inches
Drainage Area 3.16 acres
Imperviousness 65%
HSCs 0 inches
Design Infiltration Rate 0.02 in/hr
Estimated DCV 4,955 cu-ft
Harvest and Reuse Determination
Step 1 - Calculate the Design Capture Volume in Gallons DCV (cu-ft) 4,955 cu-ft
DCV (gallons) 37,066 gallons
Step 2 - Estimate Planted Area
Planter Factor (PF) for low water use 0.12
Panted Area 48,787 sf
Planted Area w/ PF 5,854 sf
Step 3 - Est.e Net Wet Season Est. Total Water Use (ETWU 7-months) Eto (Oct-Apr) from CIMIS Monthly Ave Rpt 19.18 in
Mean Avg Rainfall 12.9 in
Net ETWU (7 mnths) 22,917 gallons
DCV is greater than the Net ETWU, so Harvest and Resuse is not feasible. 1859
Water Quality Management Plan (WQMP)

Presidio

Attachment D: OPERATIONS AND

MAINTENANCE PLAN
1860
www.modularwetlands.com

Maintenance Guidelines for
Modular Wetland System - Linear
Maintenance Summary
o Remove Trash from Screening Device – average maintenance interval is 6 to 12 months.  (5 minute average service time).
o Remove Sediment from Separation Chamber – average maintenance interval is 12 to 24 months.  (10 minute average service time).
o Replace Cartridge Filter Media – average maintenance interval 12 to 24 months.  (10-15 minute per cartridge average service time).
o Replace Drain Down Filter Media – average maintenance interval is 12 to 24 months.  (5 minute average service time).
o Trim Vegetation – average maintenance interval is 6 to 12 months.  (Service time varies).

System Diagram

Access to screening device, separation
chamber and cartridge filter
Access to drain
down filter
Pre-Treatment
Chamber
Biofiltration Chamber
Discharge
Chamber
Outflow
Pipe
Inflow Pipe
(optional)

MODULAR

WETLANDS
1861
www.modularwetlands.com
Maintenance Procedures
Screening Device

1. Remove grate or manhole cover to gain access to the screening device in the PreTreatment Chamber. Vault type units do not have screening device. Maintenance can be performed without entry.

2. Remove all pollutants collected by the screening device. Removal can be done manually or with the use of a vacuum truck. The hose of the vacuum truck will not damage the screening device.

3. Screening device can easily be removed from the Pre-Treatment Chamber to gain access to separation chamber and media filters below. Replace grate or manhole cover when completed.

Separation Chamber

1. Perform maintenance procedures of screening device listed above before maintaining the separation chamber.

2. With a pressure washer spray down pollutants accumulated on walls and cartridge filters.

3. Vacuum out Separation Chamber and remove all accumulated pollutants. Replace screening device, grate or manhole cover when completed.

Cartridge Filters

1. Perform maintenance procedures on screening device and separation chamber before maintaining cartridge filters.

2. Enter separation chamber.

3. Unscrew the two bolts holding the lid on each cartridge filter and remove lid.

4. Remove each of 4 to 8 media cages holding the media in place.

5. Spray down the cartridge filter to remove any accumulated pollutants.

6. Vacuum out old media and accumulated pollutants.

7. Reinstall media cages and fill with new media from manufacturer or outside supplier. Manufacturer will provide specification of media and sources to purchase.

8. Replace the lid and tighten down bolts. Replace screening device, grate or manhole cover when completed.

Drain Down Filter

1. Remove hatch or manhole cover over discharge chamber and enter chamber.

2. Unlock and lift drain down filter housing and remove old media block. Replace with new media block. Lower drain down filter housing and lock into place.

3. Exit chamber and replace hatch or manhole cover.

MODULAR

WETLANDS
1862
www.modularwetlands.com
Maintenance Notes

1. Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms.

2. The owner should keep maintenance/inspection record(s) for a minimum of five years from the date of maintenance. These records should be made available to the governing municipality for inspection upon request at any time.

3. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements.

4. Entry into chambers may require confined space training based on state and local regulations.

5. No fertilizer shall be used in the Biofiltration Chamber.

6. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may require irrigation.

MODULAR

WETLANDS
1863
www.modularwetlands.com

Maintenance Procedure Illustration
Screening Device
The screening device is located directly
under the manhole or grate over the
Pre-Treatment Chamber. It’s mounted
directly underneath for easy access
and cleaning. Device can be cleaned by
hand or with a vacuum truck.

Separation Chamber
The separation chamber is located
directly beneath the screening device.

It can be quickly cleaned using a
vacuum truck or by hand. A pressure
washer is useful to assist in the
cleaning process.

MODULAPWETLANDS
1864
www.modularwetlands.com

Cartridge Filters
The cartridge filters are located in the
Pre-Treatment chamber connected to
the wall adjacent to the biofiltration
chamber. The cartridges have
removable tops to access the
individual media filters. Once the
cartridge is open media can be
easily removed and replaced by hand
or a vacuum truck.

Drain Down Filter
The drain down filter is located in the
Discharge Chamber. The drain filter
unlocks from the wall mount and hinges
up. Remove filter block and replace with
new block.

MODULAR

WETLANDS
1865
www.modularwetlands.com
Trim Vegetation
Vegetation should be maintained in the
same manner as surrounding vegetation
and trimmed as needed. No fertilizer shall
be used on the plants. Irrigation
per the recommendation of the
manufacturer and or landscape
architect. Different types of vegetation
requires different amounts of
irrigation.

MODULAR

WETLANDS
1866
www.modularwetlands.com
Inspection Form
Modular Wetland System, Inc.

P. 760.433-7640
F. 760-433-3176
E. [email protected]

MODULAR

WETLANDS
1867
For Office Use Only
(city) (Zip Code) (Reviewed By)
Owner / Management Company
(Date)
Contact Phone ( ) _
Inspector Name Date / / Time AM / PM
Weather Condition Additional Notes
Yes
Depth:

Yes No
Modular Wetland System Type (Curb, Grate or UG Vault): Size (22', 14' or etc.):

Other Inspection Items:

Type of Inspection Routine Follow Up Complaint Storm Storm Event in Last 72-hours? No Yes Office personnel to complete section to
the left.
2972 San Luis Rey Road, Oceanside, CA 92058 P (760) 433-7640 F (760) 433-3176 Inspection Report
Modular Wetlands System

Is the filter insert (if applicable) at capacity and/or is there an accumulation of debris/trash on the shelf system? Does the cartridge filter media need replacement in pre-treatment chamber and/or discharge chamber? Any signs of improper functioning in the discharge chamber? Note issues in comments section.

Chamber:

Is the inlet/outlet pipe or drain down pipe damaged or otherwise not functioning properly? Structural Integrity:

Working Condition:

Is there evidence of illicit discharge or excessive oil, grease, or other automobile fluids entering and clogging the unit?
Is there standing water in inappropriate areas after a dry period? Damage to pre-treatment access cover (manhole cover/grate) or cannot be opened using normal lifting pressure?
Damage to discharge chamber access cover (manhole cover/grate) or cannot be opened using normal lifting pressure?
Does the MWS unit show signs of structural deterioration (cracks in the wall, damage to frame)? Project Name
Project Address
Inspection Checklist
No Comments
Does the depth of sediment/trash/debris suggest a blockage of the inflow pipe, bypass or cartridge filter? If yes, specify which one in the comments section. Note depth of accumulation in in pre-treatment chamber.

Is there a septic or foul odor coming from inside the system? Is there an accumulation of sediment/trash/debris in the wetland media (if applicable)? Is it evident that the plants are alive and healthy (if applicable)? Please note Plant Information below.

Sediment / Silt / Clay
Trash / Bags / Bottles
Green Waste / Leaves / Foliage
Waste: Plant Information
No Cleaning Needed
Recommended Maintenance
Additional Notes:

Damage to Plants
Plant Replacement
Plant Trimming
Schedule Maintenance as Planned
Needs Immediate Maintenance
CLEAN. !NVPRONM(NTAL StltVtCE.$, INC .
----
□ □ □ □ □ □
1868
www.modularwetlands.com
Maintenance Report
Modular Wetland System, Inc.

P. 760.433-7640
F. 760-433-3176
E. [email protected]
~ R W0
EfLANDS
-·~ • • ", 6
\ ; •"'
~ \~, ''\ ' -,,-.......::.._ ' .. ~,
~
~ --
.. ,... .,, h~-- - ,::ir,, .. ,,,,,,.... ' ~ .....
• / ·::.,. .. .~ .

I ' ti!.~(;.;,"' - ; H\11~~,I ', ' i •• -,,t.,~;·,c;: . ·•,:_, i.. ,' " •. -~., . . .. ,, ., . • ' •• •• ·' - . ·•'·•'-f · '
• • • I , ... --,; ... "' .. . . • ..... ~ , , • • ~ . ' " 'flt, ... , 4'
'
;;.,:;:.__
. -. ... -,. ... ~,· . ~ -=··;;~--~ - ---
1869
For Office Use Only
(city) (Zip Code) (Reviewed By)
Owner / Management Company
(Date)
Contact Phone ( ) _
Inspector Name Date / / Time AM / PM
Weather Condition Additional Notes
Site
Map #
Comments:
2972 San Luis Rey Road, Oceanside, CA 92058 P. 760.433.7640 F. 760.433.3176 Inlet and Outlet
Pipe Condition
Drain Down Pipe
Condition
Discharge Chamber
Condition
Drain Down Media
Condition
Plant Condition
Media Filter
Condition
Long:

MWS
Sedimentation
Basin
Total Debris
Accumulation
Condition of Media
25/50/75/100
(will be changed
@ 75%)
Operational Per
Manufactures'
Specifications
(If not, why?)
Lat: MWS
Catch Basins
GPS Coordinates
of Insert
Manufacturer /
Description / Sizing
Trash
Accumulation
Foliage
Accumulation
Sediment
Accumulation
Type of Inspection Routine Follow Up Complaint Storm Storm Event in Last 72-hours? No Yes Office personnel to complete section to
the left.

Project Address
Project Name
Cleaning and Maintenance Report CLEAN Modular Wetlands System . -1_ M ODULAR E.NV/RONME.NTAL SE.RVICE.S , INC. WETLANDS ----
□ □ □ □ □ □
1870
Isolator® Row Plus
O&M Manual
///#Yo
StormTech 1871 A'\\
2 Looking down the Isolator Row
Plus from the manhole opening,
ADS Plus Fabric is shown between
the chamber and stone base.

StormTech Isolator Row Plus
with Overflow Structure
(not to scale)
The Isolator® Row Plus
Introduction
An important component of any Stormwater Pollution Prevention Plan is inspection and maintenance. The StormTech Isolator Row Plus is a technique to inexpensively enhance Total Suspended Solids (TSS), Total Phosphorus (TP), Total Petroluem Hydrocarbons (TPH) and Total Nitrogen (TN) removal with easy access for inspection and maintenance.

The Isolator Row Plus
The Isolator Row Plus is a row of StormTech chambers, either SC-160, SC310, DC-780, SC-800, MC-3500, MC-4500 or MC-7200 models, are lined with filter fabric and connected to a closely located manhole for easy access.

The fabric lined chambers provide for sediment settling and filtration as stormwater rises in the Isolator Row Plus and passes through the filter fabric. The open bottom chambers allow stormwater to flow vertically out of the chambers. Sediments are captured in the Isolator Row Plus protecting the adjacent stone and chambers storage areas from sediment accumulation.

ADS Isolator Row and Plus fabric are placed between the stone and the Isolator Row Plus chambers. The woven geotextile provides a media for stormwater filtration, a durable surface for maintenance, prevents scour of the underlying stone and remains intact during high pressure jetting.

The Isolator Row Plus is designed to capture the “first flush” runoff and offers the versatility to be sized on a volume basis or a flow-rate basis. An upstream manhole provides access to the Isolator Row Plus and includes a high/low concept such that stormwater flow rates or volumes that exceed the capacity of the Isolator Row Plus bypass through a manifold to the other chambers. This is achieved with an elevated bypass manifold or a high-flow weir. This creates a differential between the Isolator Row Plus row of chambers and the manifold to the rest of the system, thus allowing for settlement time in the Isolator Row Plus. After Stormwater flows through the Isolator Row Plus and into the rest of the chamber system it is either exfiltrated into the soils below or passed at a controlled rate through an outlet manifold and outlet control structure.

The Isolator Row Plus FlampTM is a flared end ramp apparatus attached to the inlet pipe on the inside of the chamber end cap. The FLAMP provides a smooth transition from pipe invert to fabric bottom. It is configured to improve chamber function performance by enhancing outflow of solid debris that would otherwise collect at the chamber's end, or more difficult to remove and require confined space entry into the chamber area. It also serves to improve the fluid and solid flow into the access pipe during maintenance and cleaning and to guide cleaning and inspection equipment back into the inlet pipe when complete.

The Isolator Row Plus may be part of a treatment train system. The treatment train design and pretreatment device selection by the design engineer is often driven by regulatory requirements. Whether pretreatment is used or not, StormTech recommend using the Isolator Row Plus to minimize maintenance requirements and maintenance costs.

Note: See the StormTech Design Manual for detailed information on designing inlets for a StormTech system, including the Isolator Row Plus.

STRUCTIJRE

WIELEVATED BYPASS
w.NIFOLDOR

OVERFLOW WEIR
~ TI<RO"OH"°"'
~~1 ~~-4~
l~ tt
- ~ tt - ~ tt tt ~ ~=;==ctt ~ ~*tt - ~ tt ~ ~ tt
:~ 0,11.ET-IFOLO

OUTLET CONTROL
STRUcn.RE
I
I
1 1872
3 Inspection
The frequency of inspection and maintenance varies
by location. A routine inspection schedule needs to
be established for each individual location based
upon site specific variables. The type of land use
(i.e. industrial, commercial, residential), anticipated pollutant load, percent imperviousness, climate,
etc. all play a critical role in determining the actual frequency of inspection and maintenance practices.

At a minimum, StormTech recommends annual
inspections. Initially, the Isolator Row Plus should
be inspected every 6 months for the first year of
operation. For subsequent years, the inspection
should be adjusted based upon previous observation
of sediment deposition.

The Isolator Row Plus incorporates a combination
of standard manhole(s) and strategically located
inspection ports (as needed). The inspection ports
allow for easy access to the system from the surface,
eliminating the need to perform a confined space
entry for inspection purposes.

If upon visual inspection it is found that sediment
has accumulated, a stadia rod should be inserted to
determine the depth of sediment. When the average
depth of sediment exceeds 3" (75 mm) throughout
the length of the Isolator Row Plus, clean-out should
be performed.

Maintenance
The Isolator Row Plus was designed to reduce the cost
of periodic maintenance. By “isolating” sediments
to just one row, costs are dramatically reduced
by eliminating the need to clean out each row of
the entire storage bed. If inspection indicates the
potential need for maintenance, access is provided
via a manhole(s) located on the end(s) of the row for
cleanout. If entry into the manhole is required, please follow local and OSHA rules for a confined space
entry.

Maintenance is accomplished with the JetVac
process. The JetVac process utilizes a high pressure
water nozzle to propel itself down the Isolator Row
Plus while scouring and suspending sediments.

As the nozzle is retrieved, the captured pollutants
are flushed back into the manhole for vacuuming.

Most sewer and pipe maintenance companies have
vacuum/JetVac combination vehicles. Selection of an
appropriate JetVac nozzle will improve maintenance
efficiency. Fixed nozzles designed for culverts or large diameter pipe cleaning are preferable. Rear facing
jets with an effective spread of at least 45” are best.

StormTech recommends a maximum nozzle pressure
of 2000 psi be utilized during cleaning. JetVac reels
can vary in length. For ease of maintenance, ADS
recommends Isolator Row Plus lengths up to 200'
(61 m). The JetVac process shall only be performed
on StormTech Isolator Row Plus that have ADS
Plus Fabric (as specified by StormTech) over their
angular base stone.

Isolator Row Plus Inspection/Maintenance
StormTech Isolator Row Plus (not to scale)
~~IIH.YFL.EIIBllHI lmlllCWlll:BwmtOP'i:11-lEI
I-N Nl'r ~
B.EVA1ED-MN9'0UI
M"(llallrn)lllPEIIGCEaPFEIIIE ENl~PARTl:ac&llBIIHI

OPTICIW--PUU
---
0NELA¥EAaFAIIUll.m25-GEDIEXILEIEl\'IEEN
RllNMTIDtj noEANa~EM
5' 11.!I ml .. N wmE. CClfflNIJCll.a FABRIC WIIHCUT IEAIII 1873
Isolator Row Plus Step By Step Maintenance Procedures
Step 1
Inspect Isolator Row Plus for sediment.

A) Inspection ports (if present)
i. Remove lid from floor box frame
ii. Remove cap from inspection riser
iii. Using a flashlight and stadia rod,measure depth of sediment and record results on maintenance log. iv. If sediment is at or above 3 inch depth, proceed to Step 2. If not, proceed to Step 3.

B) All Isolator Row Plus
i. Remove cover from manhole at upstream end of Isolator Row Plus ii. Using a flashlight, inspect down Isolator Row Plus through outlet pipe

1. Mirrors on poles or cameras may be used to avoid a confined space entry

2. Follow OSHA regulations for confined space entry if entering manhole iii. If sediment is at or above the lower row of sidewall holes (approximately 3 inches), proceed to Step

2. If not, proceed to Step 3.

Step 2
Clean out Isolator Row Plus using the JetVac process.

A) A fixed floor cleaning nozzle with rear facing nozzle spread of 45 inches or more is preferable B) Apply multiple passes of JetVac until backflush water is clean C) Vacuum manhole sump as required
Step 3
Replace all caps, lids and covers, record observations and actions.

Step 4
Inspect & clean catch basins and manholes upstream of the StormTech system.

ADS “Terms and Conditions of Sale” are available on the ADS website, www.adspipe.com The ADS logo, StormTech®, the Isolator® Row Plus and the Green Stripe are registered trademarks of Advanced Drainage Systems, Inc. © 2025 Advanced Drainage Systems, Inc. #11081 5/25 CS
4 2 1) B) 1) A)
Sample Maintenance Log
Date
Stadia Rod Readings Sediment
Depth
(1)–(2)
Observations/Actions Inspector Fixed point
to chamber
bottom (1)
Fixed point
to top of
sediment
(2)
3/15/11 6.3 ft none New installation. Fixed
point is CI frame at grade
DJM
9/24/11 6.2 0.1 ft Some grit felt SM
6/20/13 5.8 0.5 ft Mucky feel, debris visible
in manhole and in Isolator
Row Plus, maintenance due
NV
7/7/13 6.3 ft 0 System jetted and
vacuumed
DJM
adspipe.com
800-821-6710
///IDS
StormTech A\1874 ,

PACIFIC

SOUTHWEST

INDUSTRIES
PSI

PACIFIC

SOUTHWEST

INDUSTRIES
PSI
PSI Pacific Southwest Industries

ENGINEERED - PUMPS/FLUID HANDLING & DISPOSAL SYSTEMS - PACKAGED LIFT STATIONS 18541 Collier Ave Lake Elsinore, CA 92530
(800) 358-9095 (951) 674-2144 fax (951) 674-9444 CSL #583052 www.psipumps.com Email: [email protected]

LIFT STATION REQUIRED MAINTENANCE
The lift station should be inspected twice a year for proper operation, and should be checked for overabundance of solid matter such as grease and soap buildup.

Proper operation and inspection would include the following:
1) Automatic operation of the system by float activation. One pump starting at lead on levels, second pump starting at high level conditions; manual operation by use of the selector switches.
2) Inspect floats for proper elevation and for proper movement. Correct any obstructions.
3) Check incoming power for proper voltage. Check voltage at motor connections. 4) Check amperage of each motor.
5) Hose down lift station to clean the walls of the wet well, pumps and floats.

MECHANICAL SEAL INSPECTION OF PUMPS
Inspection of the mechanical seals should be done every two years.

The inspection will include the following:

Pull pump out of wet well. Remove oil seal plug and inspect the oil for clarity. Clear oil indicates no water intrusion and chamber is to be topped off with 30 weight turbine oil.

If oil is cloudy the mechanical seal and oil needs to be replaced.

Note: Your lift station is designed to pump raw unscreened sewage. Refrain from putting the following into your sewage system: tampons, feminine napkins, condoms, handy wipes, baby wipes, paper towels, diapers, plastic bags, q-tips, etc., and food grease. Although grease will be pumped, grease will cause problems eventually and will not be covered under the manufacturer’s warranty. Dispose of the above items in a trash can.

PSI recommends that preventive maintenance and service be performed by a qualified technician.

Any question regarding your lift station should be directed to Scott Richardson at 800- 358-9095.
1875
DW DW
DW DW
DW
DW
DW
DW
DW
DW
DW

DW DW DW DW DW DW

DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW
SS
SS
SS
SS
SS
SS

SS SS SS SS SS SS SS SS

DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW

DW DW DW DW DW
SS SS
DW

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

DW DW DW DW DW DW DW DW DW DW DW DW DW SS SS SS SS SS SS SS SS DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW

SS SS SS SS SS SS

SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS

DW DW DW DW DW DW DW

SS SS SS SS SS SS SS

DW DW DW DW DW DW SSDWSS SS SS SS SS SS SS SS SS SS SS
SS
DW
DW
DW
DW
DW
SS

SS SS SS SS SS SS

DW DW DW DW
DW DW
SD

SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD

SD SD SD SD
SD
SD

SD SD SD

SD SD SDSD SD SD SD SD SD SD SD SD SD SD DW
DW

DW DW DW
SD

SD SD SD SD SD SD

SD DW SD SD SD SD SD SD
I"(
(
,~
X
I
I
r7
I
/
/
r"
•v"r
I
I
I
I ,
I
I
I
r
I
I I 'Ii
I
I
I
I I
r
/'
_I ' I
/
J
-
I
' I ! I .. I
/
J
Q
' !
-
I
",f'-
I
'
I
,I.
/1,('l-1'li'Kffe.l--/-!...i,l.\l
' '
•
T
l

WQMP SITE PLAN

IN THE CITY OF ALISO VIEJO

COUNTY OF ORANGE, STATE OF CALIFORNIA
_ ___ ,
J
' I -r-- i ( '
t--
- __ .t
..,,
' GL~Nwoo DR
) 'l -----
i
+ / /
_j__
' -
--
-- _/ -- ~:::::--====~~s=i~:~~~~~ ----==- -- _0-;;3/ _____ ----- ~--:-::::--=::::::,; I I
~~~~~~~181;!..)....I I I
I
I INLEl ~ 1W/ TER '2__y
:, ," RAIN INLET
-------~
__ ,1(c~v / -"F,l_l..TER
0 ®t

STORM AIN CHAMBER
-
-
181
181
@ • r· @
@
@
r RESIDIO
---ILANE
_J DRAIN INLET wii rn:
--------- DRAIN INLET ,'
W/ FILTER i
' AIN pu ·p FD

D AREA RUN
~ ) BIOFIL
'
-
--
•
,- @
--
-, '
@)
@
/)
- SioEWALK ORAi
\ r ~/~· _A_R_GO_.._N_AUT
I ) -
';, < /'
,: isl J, r- '\_ (.!) ~:
"• l ~ rli ,/~-r .. C
PROPERTY ADDRESS=
15 ARGONAUT
ALISO VIEJO, CA 92656
30 15 0 30 60 90 l~~f-----1
__
1----'I
SCALE: 1''=30'
1876
Operations and Maintenance Plan
BMP
Applicable?
Yes/No
BMP Name
and BMP Implementation, Maintenance, and Inspection Procedures Implementation, Maintenance,
and Inspection Frequency
and Schedule
Person or Entity with
Operation & Maintenance
Responsibility
Non-Structural Source Control BMPs
Yes Education for Property Owners, Tenants and Occupants Educational pamphlets
Provide to home owner at time of occupancy / once
HOA
No Activity Restriction Yes Common Area Landscape Management Weekly HOA Yes BMP Maintenance Storm drain and catch basins
Twice per year HOA
No Title 22 CCR Compliance No Spill Contingency Plan
.

No Underground Storage Tank Compliance No Hazardous Materials Disclosure ComplianceNo Uniform Fire Code Implementation Yes Common Area Litter Control Trash pickup
Weekly HOA / Homeowner
No Employee Training No Housekeeping of Loading Docks
1877
Operations and Maintenance Plan
BMP
Applicable?
Yes/No
BMP Name
and BMP Implementation, Maintenance, and Inspection Procedures Implementation, Maintenance,
and Inspection Frequency
and Schedule
Person or Entity with
Operation & Maintenance
Responsibility
No Common Area Catch Basin Inspection No Street Sweeping Private Streets and Parking Lots No Retail Gasoline Outlets Structural Source Control BMPs
Yes Provide Storm Drain System Stenciling and Signage
Catch basin inlets
Yearly HOA
No Design and Construct Outdoor Material Storage Areas to Reduce Pollutant Introduction
No Design and Construct Trash and Waste Storage Areas to Reduce Pollutant Introduction
Yes Use Efficient Irrigation Systems & Landscape Design Irrigation and landscape
Twice per Year HOA
No Protect Slopes and Channels and Provide Energy Dissipation No Loading Docks No Maintenance Bays No Vehicle Wash Areas 1878
Operations and Maintenance Plan
BMP
Applicable?
Yes/No
BMP Name
and BMP Implementation, Maintenance, and Inspection Procedures Implementation, Maintenance,
and Inspection Frequency
and Schedule
Person or Entity with
Operation & Maintenance
Responsibility
No Outdoor Processing Areas No Equipment Wash Areas No Fueling Areas .

No Hillside Landscaping No Wash Water Controls for Food Preparation Areas No Community Car Wash Racks Treatment Control BMPs
Yes Treatment Control BMP # 1
Biomedia Filter
HOA
LID BMPs
Hydromodification Control BMPs
1879
Exhibit A, Operations and Maintenance Plan
Required Permits
This section must list any permits required for the implementation, operation, and maintenance of the BMPs. Possible examples are:
• Permits for connection to sanitary sewer
• Permits from California Department of Fish and Game
• Encroachment permits
If no permits are required, a statement to that effect should be made.

Responsible Party
The owner is aware of the maintenance responsibilities of the proposed BMPs. A funding mechanism is in place to maintain the BMPs at the frequency stated in the LID Plan. The contact information for the entity responsible is below:

Name:

Company: Whittier 25, LLC
Title: Vice President
Address 1:

Address 2:

Phone Number: 949-296-2400
Email:

Forms to Record BMP Implementation, Maintenance, and Inspection The form that will be used to record implementation, maintenance, and inspection of BMPs is attached. All records must be made available for review upon request. 1880

RECORD OF BMP IMPLEMENTATION, MAINTENANCE, AND INSPECTION Today’s Date:

Name of Person Performing Activity
(Printed):

Signature:

BMP Name
(As Shown in O&M Plan)
Brief Description of Implementation, Maintenance, and
Inspection Activity Performed
1881
Water Quality Management Plan (WQMP)

Presidio

Attachment E: GEOTECHNICAL REPORT
1882
Corona Office
Phone: 951.509.7090
BRANDYWINE HOMES September 26, 2025
2355 Main Street Project No. 1-0631
Irvine, CA 92614
Attention: Mr. Emmanuel Robinson
Subject: GEOTECHNICAL INVESTIGATION
15 Argonaut,
City of Aliso Viejo, County of Orange, California
References: Appendix A
Dear Mr. Robinson:

Alta California Geotechnical, Inc. (Alta) is pleased to present this geotechnical investigation for the proposed residential development of 15 Argonaut, located in the City of Aliso Viejo, County of Orange, California. This report is based on a recent subsurface investigation conducted by Alta, laboratory testing, and Alta’s staff’s experience with similar projects in this vicinity.

Alta’s review of the data indicates that the proposed development is feasible, from a geotechnical perspective, provided that the recommendations presented in this report are incorporated into the grading and improvement plans and implemented during site development.

Included in this report are:
 Discussion of the site geotechnical conditions.
 Recommendations for remedial and site grading, including unsuitable soil removals.  Geotechnical site construction recommendations.
 Foundation design parameters.

ALTA CALIFORNIA

GEOTECHNICAL INC,
170 North Maple Street, Suite 108
Corona, CA 92880
www.altageotechnical .com
1883
Project Number 1-0631 Page ii
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

If you have any questions or should you require any additional information, please contact the undersigned at (951) 509-7090. Alta appreciates the opportunity to provide geotechnical consulting services for your project.

Sincerely,
Alta California Geotechnical, Inc. Reviewed By:
________________________________
YOUSSEF F. HIJAZI
Engineering Geology Associate
________________________________
LOGAN A. MARQUETTE
Civil Engineering Associate
___________________________________
SCOTT A. GRAY/RGE 2857
Reg. Exp.: 12-31-26
Registered Geotechnical Engineer
President
________________________________
FRANK J. ECHENIQUE/CEG 2134
Reg. Exp.: 7-31-26
Engineering Geologist
Manager of Geologic Services
Distribution: (1) Addressee
YFH:LAM:SAG:FJE -1-0631, September 26, 2025 (Geotechnical Investigation, 15 Argonaut, Aliso Viejo)

1884
Project Number 1-0631 Page iii
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

1.0 INTRODUCTION ..................................................................................................................... 1

1.1 Purpose ............................................................................................................................. 1

1.2 Scope of Work .................................................................................................................. 1

1.3 Report Limitations ............................................................................................................ 1

2.0 PROJECT DESCRIPTION .......................................................................................................... 2

2.1 Site Location and Background .......................................................................................... 2

2.2 Proposed Development.................................................................................................... 2

3.0 SITE INVESTIGATION AND LABORATORY TESTING ............................................................... 2

3.1 Subsurface Investigation .................................................................................................. 2

3.2 Infiltration Testing ............................................................................................................ 3

4.0 GEOLOGIC CONDITIONS ........................................................................................................ 3

4.1 Geologic and Geomorphic Setting ................................................................................... 3

4.2 Stratigraphy ...................................................................................................................... 4

4.2.1 Monterey Formation (map symbol Tmy).................................................................... 4

4.3 Geologic Structure ............................................................................................................ 4

4.3.1 Tectonic Framework ................................................................................................... 4

4.3.2 Regionally Mapped Active Faults ................................................................................ 5

4.3.3 Geologic Structure ...................................................................................................... 5

4.4 Groundwater .................................................................................................................... 5

4.5 Earthquake Hazards ......................................................................................................... 6

4.5.1 Local and Regional Faulting ........................................................................................ 6

4.5.2 Surface Rupture .......................................................................................................... 6

4.5.3 Seismicity .................................................................................................................... 7

4.5.4 Landslide Potential ...................................................................................................... 7

4.5.5 Liquefaction ................................................................................................................ 7

5.0 ENGINEERING PROPERTIES AND ANALYSIS .......................................................................... 8

5.1 Materials Properties ......................................................................................................... 8

5.1.1 Excavation Characteristics .......................................................................................... 8

5.1.2 Compressibility ............................................................................................................ 8

5.1.3 Hydro-Consolidation ................................................................................................... 8

5.1.4 Expansion Potential .................................................................................................... 9

5.1.5 Earthwork Adjustments .............................................................................................. 9

5.1.6 Chemical Analyses ..................................................................................................... 10 1885
Project Number 1-0631 Page iv
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

5.2 Engineering Analysis ....................................................................................................... 10

5.2.1 Bearing Capacity and Lateral Earth Pressures .......................................................... 10

6.0 CONCLUSIONS AND RECOMMENDATIONS ......................................................................... 11

6.1 Remedial Grading Recommendations ............................................................................ 11

6.1.1 Site Preparation ........................................................................................................ 11

6.1.2 Unsuitable Soil Removals .......................................................................................... 12

6.2 General Earthwork Recommendations .......................................................................... 13

6.2.1 Compaction Standards .............................................................................................. 13

6.2.2 Groundwater/Seepage ............................................................................................. 13

6.2.3 Documentation of Removals .................................................................................... 13

6.2.4 Treatment of Removal Bottoms ............................................................................... 14

6.2.5 Fill Placement ............................................................................................................ 14

6.2.6 Mixing ........................................................................................................................ 14

6.2.7 Import Soils ............................................................................................................... 14

6.2.8 Utility Trenches ......................................................................................................... 15

6.2.8.1 Excavation ....................................................................................................................................... 15

6.2.8.2 Backfill ............................................................................................................................................. 15

6.3 Slope Stability ................................................................................................................. 16

7.0 DESIGN CONSIDERATIONS .................................................................................................. 16

7.1 Structural Design ............................................................................................................ 16

7.1.1 Foundation Design .................................................................................................... 17

7.1.2 Post-Tensioning Slabs/Foundation Design Recommendations ................................ 17

7.2 Moisture Barrier ............................................................................................................. 18

7.3 Seismic Design ................................................................................................................ 19

7.4 Fence and Garden Walls................................................................................................. 20

7.5 Footing Excavations ........................................................................................................ 20

7.6 Retaining Walls ............................................................................................................... 20

7.7 Exterior Slabs and Walkways ......................................................................................... 22

7.7.1 Subgrade Compaction ............................................................................................... 22

7.7.2 Subgrade Moisture ................................................................................................... 22

7.7.3 Concrete Slab Thickness ........................................................................................... 22

7.7.4 Concrete Slab Reinforcement ................................................................................... 22

7.7.5 Control Joints ............................................................................................................ 23

7.8 Concrete Design ............................................................................................................. 23 1886
Project Number 1-0631 Page v
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.9 Corrosion ........................................................................................................................ 23

7.10 Pavement Design ............................................................................................................ 24

8.0 LOT MAINTENANCE ............................................................................................................. 25

8.1 Lot Drainage ................................................................................................................... 25

8.2 Burrowing Animals ......................................................................................................... 25

9.0 FUTURE PLAN REVIEWS ...................................................................................................... 25

10.0 CLOSURE........................................................................................................................ 26

10.1 Geotechnical Review ...................................................................................................... 26

10.2 Limitations ...................................................................................................................... 26 APPENDIX A: REFERENCES
APPENDIX B: SUBSURFACE INVESTIGATION
APPENDIX C: LABORATORY TESTING
APPENDIX D: MAINTENANCE CONSIDERATIONS
APPENDIX E: EARTHWORK SPECIFICATIONS
APPENDIX F: GRADING DETAILS
1887
Project Number 1-0631 Page 1
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

1.0 INTRODUCTION
This report presents Alta’s findings, conclusions, and geotechnical recommendations for the proposed development of 15 Argonaut, located in the City of Aliso Viejo, County of Orange, California.

1.1 Purpose
The purpose of this report is to examine the existing onsite geotechnical conditions and assess the impacts that the geotechnical conditions may have on the proposed development. This report is suitable for use in developing grading plans and engineer’s cost estimates.

1.2 Scope of Work
Alta’s Scope of Work for this geotechnical investigation included the following:
 Reviewing the referenced reports and air photos (Appendix A).  Site geologic mapping.
 Excavating, logging, and sampling four (4) hollow stem auger borings to a maximum depth of 51.5-feet below the existing surface (Appendix B).  Conducting laboratory testing on samples obtained during our investigation (Appendix C).
 Conducting two (2) infiltration tests in two (2) additional borings at a maximum depth of 5.0-feet below the ground surface.
 Evaluating engineering geologic and geotechnical engineering data, including laboratory data, to develop recommendations for site remedial grading, import soil, foundations, and utilities.
 Preparing this report and accompanying exhibits.

1.3 Report Limitations
The conclusions and recommendations presented in this report are based on the field and laboratory information generated during this investigation, and a review of the referenced reports. The information contained in this report is intended to be used for development of grading plans and preliminary construction cost estimates.
1888
Project Number 1-0631 Page 2
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

2.0 PROJECT DESCRIPTION

2.1 Site Location and Background
The irregular-shaped, approximately 4.6-acre site is bounded to the north by Glenwood Drive, to the west by Aliso Creek Road, and to the east and south by existing developments. The site is currently occupied by a commercial building and associated parking.

Historic aerial images are available as far back as 1938 and indicate the site was originally vacant. By 1992, the commercial building was constructed along with associated parking. The site has remained relatively unchanged since (Historic Aerials, 2025).

2.2 Proposed Development
The site will be redeveloped to support a residential development consisting of 58 single-family residential structures and associated improvements. Alta anticipates that conventional cut-and-fill grading techniques will be used to develop the site for the support of wood-frame construction with shallow foundations and reinforced concrete slabs-on-grade, and associated improvements.

3.0 SITE INVESTIGATION AND LABORATORY TESTING

3.1 Subsurface Investigation
Alta conducted a subsurface investigation on August 27th, 2025, consisting of the drilling, logging, and select sampling of four (4) hollow stem auger borings up to a maximum depth of 51.5-feet below the ground surface. The locations of the exploratory borings and excavations are shown on Plate 1 and the logs are presented in Appendix B.

Laboratory testing was performed on bulk samples obtained during the field investigation. A brief description of the laboratory test procedures and the test results are presented in Appendix C.
1889
Project Number 1-0631 Page 3
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

3.2 Infiltration Testing
It is Alta’s understanding that the project may utilize infiltration systems for storm water disposal. Details of the system are not known at this time.

Infiltration testing was conducted in two (2) boring wells at a depth of 5.0-feet below the ground surface at specified locations. The testing was performed in general conformance with the County of Orange WQMP specifications. The testing wells were presoaked for more than 24 hours prior to testing. During testing, the water level readings were recorded every 10 to 30 minutes until the readings stabilized.

The data was then adjusted to provide an infiltration rate utilizing the Porchet Method. The resulting field infiltration rates, with no factor of safety, are summarized below in Table 3-1.

Table 3-1
Summary of Infiltration Testing
(No Factor of Safety)
Test Designation P-1 P-2
Approximate Depth of Test 5.0 ft 5.0 ft
Final Time Interval 10 minutes 10 minutes
Radius of Test Hole 4 inches 4 inches
Tested Infiltration Rate 0.03 in/hr 0.00 in/hr

4.0 GEOLOGIC CONDITIONS

4.1 Geologic and Geomorphic Setting
Regionally, the subject site is located in the Peninsular Ranges geomorphic province, which characterizes the southwest portion of southern California where right-lateral major active fault zones predominately trend northwestsoutheast. The Peninsular Ranges province is composed of plutonic and metamorphic rock, with lesser amounts of Tertiary volcanic and sedimentary rock, Quaternary drainage in-fills and sedimentary veneers. 1890
Project Number 1-0631 Page 4
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

4.2 Stratigraphy
Based on our literature review and subsurface investigation, the subject site is underlain by the Monterey Formation (CDC, 2001, Figure 1). The geologic unit is briefly described below.

4.2.1 Monterey Formation (map symbol Tmy)
The Miocene-age Monterey Formation observed onsite primarily consists of silty sandstone, clayey sandstone, sandy claystone, sandstone, and claystone. The fine grained silty sandstone onsite is pale brown, white, dark yellowish brown, and brown in a slightly moist to moist and medium dense to very dense condition. The fine grained clayey sandstone onsite is pale brown, white, dark brown, brown, gray, light gray, dark grayish brown, and bluish gray in a slightly moist to moist and medium dense to dense condition. The sandy claystone onsite is dark brown, brown, and gray in a moist and stiff to very stiff condition. The very fine to fine grained sandstone onsite is pale brown, yellowish brown, grayish pale brow, and orange in a slightly moist and medium dense to very dense condition. The claystone onsite is dark brown to brown in a moist and very stiff condition. This unit was logged to a depth of 51.5 feet below the ground surface and is overlain by a thin layer of asphalt.

4.3 Geologic Structure

4.3.1 Tectonic Framework
Jennings (1985) defined eight structural provinces within California that have been classified by predominant regional fault trends and similar fold structure. These provinces are in turn divided into blocks and sub-blocks that are defined by “major Quaternary faults.” These blocks and subblocks exhibit similar structural features. Within this framework, the subject site is located within Structural Province I, which is controlled by 1891
Figure 1
Project Name: 15 Argonaut
Project No.: 1-0631
Date: 9/26/2025
Site Location
Oac = lluvi un lluvi urn
.
' iguel Format ion Ob = Beach cdimc n1

GEOLOGI MAP OF ORANGE CO T C LIF R IA,

ALTA CALIFORNIA

GEOTECHNICAL INC,

SHOW G MI ES AND MI ERAL DEPO ITS
Compiled by P. K. Morton ond R. . Mille r
JO 1
1892
Project Number 1-0631 Page 5
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
the dominant northwest trend of the San Andreas Fault and is divided into two blocks, the Coast Range Block and the Peninsular Block. The Peninsular Range Block, on which this site is located, is characterized by a series of parallel, northwest trending faults that exhibit right-lateral strike-slip movement. These faults are terminated by the Transverse Range block to the north and extend southward into the Baja Peninsula.

These northwest trending faults divide the Peninsular Range block into eight sub-blocks. The site is located in the northwestern portion of the Santa Ana sub-block, one of the eight sub-blocks, which is bound on the east by the Elsinore fault zone and on the west by the NewportInglewood fault zone.

4.3.2 Regionally Mapped Active Faults
Several large, active fault systems including the Elsinore and NewportInglewood faults occur in the region surrounding the site. These fault systems have been studied extensively and in a large part control the geologic structure of southern California.

4.3.3 Geologic Structure
Based upon our literature review, the younger fan deposits are of Quaternary age and are not folded or faulted.

4.4 Groundwater
Groundwater was not encountered during our subsurface investigation. Based on state-provided information, the historic-high groundwater is greater than

20.0 feet below the ground surface (CGS, 2001). The most recent groundwater data retrieved from the nearest groundwater monitoring site, site ID 336555N1176965W001, was recorded in 2024 and indicates groundwater was approximately greater than 60.0-feet at that time (CDWR, 2025). 1893
Project Number 1-0631 Page 6
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

4.5 Earthquake Hazards
The subject site is located in southern California, which is a tectonically active area. The type and magnitude of seismic hazards affecting a site are dependent on the distance to the causative fault and the intensity and magnitude of the seismic event. The seismic hazard may be primary, such as surface rupture and/or ground shaking, or secondary, such as liquefaction and/or ground lurching.

4.5.1 Local and Regional Faulting
The site is located in the northwestern portion of the Santa Ana subblock. The closest known active faults and their distances to the site are presented on Table 4-1 below.

TABLE 4-1
Local and Regional Faulting
Fault Zone Distance to Fault Zone
San Joaquin Hills 2.2 miles
Newport-Inglewood 7.1 miles
Elsinore 18.0 miles
Chino 18.4 miles
Palos Verdes 21.7 miles
Puente Hills (Coyote Hills) 22.1 miles
Coronado Bank 24.2 miles
Puente Hills (Santa Fe Springs) 28.6 miles

4.5.2 Surface Rupture
Active faults are not known to exist within the project and a review of Special Publication 42 indicates the site is not within a California State designated earthquake fault zone. Accordingly, the potential for fault surface rupture on the subject site is very low.
1894
Project Number 1-0631 Page 7
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

4.5.3 Seismicity
Ground shaking hazards caused by earthquakes along other active regional faults do exist. The 2022 California Building Code requires usemodified spectral accelerations and velocities for most structural designs.

Seismic design parameters using soil profile types identified in the 2022 California Building Code are presented in Section 7.3.

4.5.4 Landslide Potential
Based on a review of the Seismic Hazard Zone Report for the San Juan Capistrano Quadrangle, the slope superjacent to the site is within an area with landslide potential. Further discussion into this hazard and its effects on the proposed project are presented in Section 6.3.

4.5.5 Liquefaction
Seismic agitation of relatively loose saturated sands, silty sands, and some silts can result in a buildup of pore pressure. If the pore pressure exceeds the overburden stresses, a temporary quick condition known as liquefaction can occur. Liquefaction effects can manifest in several ways including: 1) loss of bearing; 2) lateral spread; 3) dynamic settlement; and 4) flow failure. Lateral spreading has typically been the most damaging mode of failure.

In general, the more recent that a sediment has been deposited, the more likely it will be susceptible to liquefaction. Other factors that must be considered are groundwater, confining stresses, relative density, and the intensity and duration of seismically induced ground shaking.

Based on State provided information, the site is not located within a liquefaction zone. Groundwater was not encountered during our investigation to a depth of 51.5-feet bgs. Based on density of the 1895
Project Number 1-0631 Page 8
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
underlying formation, it is anticipated that the potential for liquefaction is nil.

5.0 ENGINEERING PROPERTIES AND ANALYSIS

5.1 Materials Properties
Presented herein is a general discussion of the engineering properties of the onsite materials that will be encountered during construction of the proposed project. Descriptions of the soil (Unified Soil Classification System) are presented on the logs in Appendices B.

5.1.1 Excavation Characteristics
Based on the data provided from the subsurface investigation, it is our opinion that the majority of the onsite materials possess favorable excavation characteristics such that conventional equipment can be utilized. Considerations should be given to the high moisture content of the diatomaceous soils encountered, as presented in the boring logs (Appendix B).

5.1.2 Compressibility
The upper portions of the Monterey Formation onsite are considered compressible and unsuitable to support the proposed improvements.

Recommended removal depths are presented in Section 6.1.2.

As noted in the boring logs (Appendix B), the onsite soils are diatomaceous. Considerations should be given to the low dry density and high moisture content.

5.1.3 Hydro-Consolidation
Hydro-consolidation is the effect of introducing water into soil that is prone to collapse. Upon loading and initial wetting, the soil structure and apparent strength are altered resulting in almost immediate settlement. 1896
Project Number 1-0631 Page 9
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

That settlement can have adverse impacts on engineered structures, particularly in areas where it is manifested differentially. Differential settlements are typically associated with differential wetting, irregularities in the subsurface soil conditions, or irregular loading patterns.

Based on laboratory testing (Appendix C), there is minimal potential for hydro-collapse in the Monterey Formation onsite.

5.1.4 Expansion Potential
Expansion index testing was performed on samples taken during our subsurface investigation. Based on laboratory results, it is anticipated that the majority of materials onsite are “low” to “medium” in expansion potential (21≤EI≤90, Appendix C) when tested per ASTM D: 4829.

5.1.5 Earthwork Adjustments
The values presented in Table 5-2 are deemed appropriate for estimating purposes and may be used in an effort to balance earthwork quantities.

As is the case with every project, contingencies should be made to adjust the earthwork balance when grading is in-progress and actual conditions are better defined.

TABLE 5-2
Earthwork Adjustment Factors
Geologic Unit
Adjustment Factor
Range
Average
Monterey Formation Shrink 4% to 8% 6%

1897
Project Number 1-0631 Page 10
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

5.1.6 Chemical Analyses
Chemical testing was performed on samples of material underlying the proposed site. Soluble sulfate test results indicate that the soluble sulfate concentrations of the soils tested are classified as negligible (Category S0) per ACI 318-14.

Negligible chloride levels were detected in the onsite soils. Based on laboratory results of soluble sulfate, chloride, and pH testing as presented in Appendix C, the onsite soils are classified as “non-corrosive” to buried metals and concrete (Caltrans, 2022). Additional discussions on corrosion are presented in Section 7.9. Corrosion tests results are presented in Appendix C.

5.2 Engineering Analysis
Presented below is a general discussion of the engineering analysis methods that were utilized to develop the conclusions and recommendations presented in this report.

5.2.1 Bearing Capacity and Lateral Earth Pressures
Ultimate bearing capacity values were obtained using the graphs and formula presented in NAVFAC DM-7.1. Allowable bearing was determined by applying a factor of safety of at least 3 to the ultimate bearing capacity. Static lateral earth pressures were calculated using Rankine methods for active and passive cases. If it is desired to use Coulomb forces, a separate analysis specific to the application can be conducted.

1898
Project Number 1-0631 Page 11
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.0 CONCLUSIONS AND RECOMMENDATIONS
Based on Alta’s findings during our subsurface investigation, the laboratory test results, and our staff’s previous experience in the area, it is Alta’s opinion that the development of the site is feasible from a geotechnical perspective. Presented below are recommendations that should be incorporated into site development and construction plans.

6.1 Remedial Grading Recommendations
All grading shall be accomplished under the observation and testing of the project geotechnical consultant in accordance with the recommendations contained herein and the City of Santa Ana criteria.

6.1.1 Site Preparation
Vegetation, construction debris, and other deleterious materials are unsuitable as structural fill material and should be disposed of offsite prior to commencing grading/construction. Any septic tanks, seepage pits or wells should be abandoned as per the County of Orange Department of Health Services.

Existing concrete should be removed prior to the placement of engineered fill. The demolished concrete may be incorporated into compacted, engineered fills after it is crushed to a maximum size of six (6) inches. Prior to placement as engineered fill any protruding steel rebar should be cut from the concrete pieces and disposed of offsite.

Existing asphaltic concrete should be removed prior to the placement of engineered fill. From a geotechnical perspective, this material may be incorporated into compacted, engineered fills after it is ground down to passing the #4 sieve.
1899
Project Number 1-0631 Page 12
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.1.2 Unsuitable Soil Removals
The upper portions of alluvium are compressible and as such, are not suitable to support the proposed structures. Therefore, it is anticipated that, on average, the upper five (5) feet of existing soils will require removal and recompaction, extending a minimum of five (5) feet horizontally outside of the structures. This recommended removal combined with the foundation recommendations presented in Section

7.1 should provide suitable support for the proposed structures.

Footings for structures should be underlain by a minimum of three (3) feet of compacted fill. As such, for building pads where unsuitable soil removals do not provide the minimum depth of compacted fill, or where design grades and/or remedial grading activities create cut/fill transitions, the cut and shallow fill portions of the building pads should be over-excavated during grading and replaced with compacted fill. This condition shall be reviewed as foundation plans become available. The intent of this recommendations if for foundation loads to be encompassed within the engineered fill.

The Project Geotechnical Consultant should observe the removal bottom prior to placing fill. If unsuitable soils such as undocumented artificial fill is exposed upon the completion of the removals recommended above, additional removals may be required.

For fill areas in parking lots/drive aisles, in general, a minimum removal and recompaction of the upper two (2) feet is recommended, however all undocumented artificial fill shall be removed and recompacted. For cuts greater than two (2) feet in street areas, removals are not required. For 1900
Project Number 1-0631 Page 13
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
cuts less than two (2) feet, the two (2) foot removal and recompaction applies.

6.2 General Earthwork Recommendations

6.2.1 Compaction Standards
All fill and processed natural ground shall be compacted to a minimum relative compaction of 90 percent, as determined by ASTM Test Method:

D-1557. Fill material should be moisture conditioned to optimum moisture or above, and as generally discussed in Alta’s Earthwork Specification Section presented in Appendix E. Compaction shall be achieved with the use of heavy earthwork equipment. Mixing and moisture conditioning will be required in order to achieve the recommended moisture conditions.

As noted in the boring logs (Appendix B), the onsite soils are diatomaceous. Considerations should be given to the low dry density and high moisture content. It is recommended to utilize a contractor familiar with the difficulty of conducting grading operations within diatomaceous soil. Slower production rates should be anticipated.

6.2.2 Groundwater/Seepage
Groundwater was not encountered during the subsurface investigation. It is not anticipated that groundwater will be encountered during construction. It is possible that perched groundwater conditions could be encountered depending on the time of year construction occurs.

6.2.3 Documentation of Removals
All removal/over-excavation bottoms should be observed and approved by the project Geotechnical Consultant prior to fill placement.

Consideration should be given to surveying the removal bottoms and undercuts after approval by the geotechnical consultant and prior to the 1901
Project Number 1-0631 Page 14
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
placement of fill. Staking should be provided in order to verify undercut locations and depths.

6.2.4 Treatment of Removal Bottoms
At the completion of removals/over-excavation, the exposed removal bottom should be ripped to a minimum depth of eight (8) inches, moisture-conditioned to above optimum moisture content and compacted in-place to the project standards.

6.2.5 Fill Placement
After removals, scarification, and compaction of in-place materials are completed, additional fill may be placed. Fill should be placed in eightinch bulk maximum lifts, moisture conditioned or dried back so as to achieve optimum moisture content or above, compacted and tested as grading progresses until final grades are attained.

6.2.6 Mixing
Mixing of materials may be necessary to prevent layering of different soil types and/or different moisture contents. The mixing should be accomplished prior to and as part of compaction of each fill lift.

6.2.7 Import Soils
Import soils, if necessary, should consist of clean, structural quality, compactable materials similar to the on-site soils and should be free of trash, debris, or other objectionable materials. The project Geotechnical Consultant should be notified not less than 72 hours in advance of the locations of any soils proposed for import. Import sources should be sampled, tested, and approved by the project Geotechnical Consultant at the source prior to the importation of the soils to the site. The project Civil Engineer should include these requirements on plans and specifications for the project.
1902
Project Number 1-0631 Page 15
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

6.2.8 Utility Trenches

6.2.8.1 Excavation
Utility trenches should be supported, either by laying back excavations or shoring, in accordance with applicable OSHA standards. In general, existing site soils are classified as Soil Type “B” and "C" per OSHA standards. Upon completion of the recommended removals and recompaction, the artificial fill will be classified as Soil Type "B". The Project
Geotechnical Consulting should be consulted if geologic conditions vary from what is presented in this report.

6.2.8.2 Backfill
Trench backfill should be compacted to at least 90 percent of maximum dry density as determined by ASTM D-1557.

Onsite soils will not be suitable for use as bedding material but will be suitable for use in backfill provided oversized materials are removed. Although suitable for backfill,
consideration should be given to utilizing imported materials as backfill materials. If native soils are to be used, slower production rates should be anticipated. No surcharge loads should be imposed above excavations. This includes spoil piles, lumber, concrete trucks, or other construction
materials and equipment. Drainage above excavations
should be directed away from the banks. Care should be
taken to avoid saturation of the soils. Compaction should be accomplished by mechanical means. Jetting of native soils will not be acceptable.
1903
Project Number 1-0631 Page 16
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

Under-slab trenches should also be compacted to project specifications. If select granular backfill (SE > 30) is used, compaction by flooding will be acceptable.

6.3 Slope Stability
Surrounding the western and northern boundary of the site, adjacent to Glenwood Drive and Aliso Creek Road, is an approximately 50 foot slope ascending from the site. Within this slope is a landslide hazard mapped by the California Department of Conservation (CDMG, 2001). Based on a review of available data, the construction of the slope was completed during the grading of the existing structures or adjacent streets. Reports pertaining to this grading and any geologic / geotechnical reports pertaining to the hazard are not available from the City or the County. No visible instabilities were observed during our investigation. V-ditches are currently in place, and the existing slope is planted.

In consideration of the existing slope, the proposed structures have been setback from the toe of the slope in accordance with the requirements of the CBC.

Further review should be done as the project progresses. Additional recommendations pertaining to the grading and mitigation of the mapped hazard may be required based on conditions exposed during grading.

7.0 DESIGN CONSIDERATIONS

7.1 Structural Design
It is anticipated that multi-story residential structures with slab on-grade and shallow foundations will be constructed. Upon the completion of rough grading, finish grade samples should be collected and tested in order to provide specific recommendations as they relate to the individual building pads. These test 1904
Project Number 1-0631 Page 17
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
results and corresponding design recommendations should be presented in a final rough grading report. Final slab and foundation design recommendations should be made based upon specific structure sitings, loading conditions, and asgraded soil conditions.

It is anticipated that the majority of onsite soils will possess “low” to “medium” expansion potential when tested in general accordance with ASTM Test Method D: 4829. Due to the inherent characteristics of diatomaceous soils, it is recommended to utilize post-tensioned foundations in the design of the project.

7.1.1 Foundation Design
Foundations may be preliminary designed based on the values presented in Table 7-1 below.

Table 7-1
Foundation Design Parameters*
Allowable Bearing 1500 lbs/ft2 (assuming a minimum embedment depth and width of 12 inches)
Lateral Bearing 250 lbs/ft2 at a depth of 12 inches plus 250 lbs/ft2 for each additional 12 inches of embedment to a maximum of 2000
lbs/ft2
.

Sliding Coefficient 0.30
Settlement Static Settlement – 0.5 inch in 40 feet
Dynamic Settlement – 0.5 inch in 40 feet
*These values may be increased as allowed by Code to resist transient loads such as wind or seismic. Building code and structural design considerations may govern depth and reinforcement requirements and should be evaluated.

7.1.2 Post-Tensioning Slabs/Foundation Design Recommendations Post-tensioned slabs for the project may be designed utilizing the parameters presented in Tables 7-1 and 7-2. The parameters presented herein are based on methodology provided in the Design of PostTensioned Slabs-On-Ground, Third Edition, by the Post-Tensioning Institute, in accordance with the 2022 CBC.

1905
Project Number 1-0631 Page 18
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

TABLE 7-2

POST-TENSION SLAB DESIGN PARAMETERS
Category Expansion Potential Minimum
Embedment*
Edge Lift Center Lift
Em (ft) Ym
(inch) Em (ft) Ym (inch)
I Low 12 inches 5.4 0.61 9.0 0.26
II Medium 18 inches 5.0 1.10 9.0 0.46
Slab Subgrade Moisture
Category I Minimum 110% of optimum moisture to a depth of 12 inches prior to pouring concrete
Category II Minimum 120% of optimum moisture to a depth of 12 inches prior to pouring concrete
Embedment*
The minimum footing embedments presented herein are based on expansion indexes. The structural engineer should determine minimum embedments based on the number of floors supported by the footings, the structural loading, and the requirements of the latest California Building Code. If mat slabs are utilized, alternate embedment depths can be provided.

Moisture Barrier
A moisture barrier should be provided in accordance with the recommendations presented in Section 7.2 The parameters presented herein are based on procedures presented in the Design of Post-Tensioned Slabs-OnGround, Third Edition. No corrections for vertical barriers at the edge of the slab, or for adjacent vegetation have been assumed. The design parameters are based on a Constant Suction Value of 3.9 pF.

7.2 Moisture Barrier
A moisture and vapor retarding system should be placed below the slabs-ongrade in portions of the structure considered to be moisture sensitive and should be capable of effectively preventing the migration of water and reducing the transmission of water vapor to acceptable levels. Historically, a 10-mil plastic membrane, such as Visqueen, placed between two to four inches of clean sand, has been used for this purpose. The use of this system or other systems can be considered, at the discretion of the designer, provided the system reduces the vapor transmission rates to acceptable levels.

i
i
1906
Project Number 1-0631 Page 19
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.3 Seismic Design
The site classes were determined based on the referenced reports and published geologic maps in the area in general conformance with Chapter 20 of ASCE 7-16.

Based on the density of the underlying soils, a Site Class of D (shear wave velocity of 259 m/s) was selected. The seismic design parameters were calculated using a program based on the USGS website and ASCE 7-16 procedures. The resulting values are presented in Table 7-3. These values are applicable providing the exceptions presented in Supplements 2 and 3 of ASCE 7- 16 are utilized in the design of the structure. If the design does not include the exception methodology, then a site-specific analysis shall be conducted.

TABLE 7-3 Seismic Ground Motion Values
2022 CBC and ASCE 7-16
Parameter Value
Site Class D
Site Latitude 33.5937
Site Longitude -117.7272
Spectral Response Acceleration Parameter, SS 1.22
Spectral Response Acceleration Parameter, S1 0.438
Site Coefficient, Fa 1.012
Site Coefficient, Fv 1.85
MCE Spectral Response Acceleration Parameter, SMS 1.235 MCE Spectral Response Acceleration Parameter, SM1 0.810 Design Spectral Response Acceleration Parameter, SDS 0.823 Design Spectral Response Acceleration Parameter, SD1 0.540 Peak Ground Acceleration, PGAM 0.568
1907
Project Number 1-0631 Page 20
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.4 Fence and Garden Walls
Block walls, if used, should be embedded a minimum of 2 feet below the lowest adjacent grade. Construction joints (not more than 20 feet apart) should be included in the block wall construction. Side yard walls should be structurally separated from the rear yard wall.

7.5 Footing Excavations
Soils from the footing excavations should not be placed in slab-on-grade areas unless properly compacted and tested. The excavations should be cleaned of all loose/sloughed materials and be neatly trimmed at the time of concrete placement. The Project Geotechnical Consultant should observe the footing excavations prior to the placement of concrete to determine that the excavations are founded in suitably compacted material.

7.6 Retaining Walls
Retaining walls should be founded on engineered fill and should be backfilled with granular soils that allow for drainage behind the wall. Foundations may be designed in accordance with the recommendations presented in Table 7-1, above. Unrestrained walls, free to horizontally move 0.0005H (for dense cohesionless backfill), may be designed to resist lateral pressures imposed by a fluid with a unit weight determined in accordance with the Table 7-4 below. The table also presents design parameters for restrained (at-rest) retaining walls.

These parameters may be used to design retaining walls that may be considered as restrained due to the method of construction or location (corner sections of unrestrained retaining walls).

TABLE 7-4
Equivalent Fluid Pressures for 90% Compacted Fill (Select Material) Backfill Active Pressure (psf/ft) At-Rest Pressure (psf/ft) Level 35 55 I I
I
I
1908
Project Number 1-0631 Page 21
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

Per the requirements of the 2022 CBC, the seismic force acting on the retaining walls with backfill exceeding 6-feet in height may be resolved utilizing the formula 12.5H2 lb/lineal ft (H=height of the wall). This force acts at approximately 0.6H above the base of the wall. The seismic value can be converted as required by the retaining wall engineer. Retaining walls should be designed in general accordance with Section 1807A.2 of the 2022 CBC.  Restrained retaining walls should be designed for “at-rest” conditions.  The design loads presented in the above table are to be applied on the retaining wall in a horizontal fashion and as such friction between wall and retained soils should not be allowed in the retaining wall analyses.  Additional allowances should be made in the retaining wall design to account for the influence of construction loads, temporary loads, and possible nearby structural footing loads.
 Select backfill should be granular, structural quality backfill with a Sand Equivalent of 20 or better and an ASCE Expansion Index of 20 or less. The backfill must encompass the full active wedge area. The upper one foot of backfill should be comprised of native on-site soils (see Plate A).  The wall design should include waterproofing (where appropriate) and backdrains or weep holes for relieving possible hydrostatic pressures. The backdrain should be comprised of a 4-inch perforated PVC pipe in a 1 ft. by 1 ft., ¾-inch gravel matrix, wrapped with a geofabric. The backdrain should be installed with a minimum gradient of 2 percent and should be outletted to an appropriate location. For subterranean walls this may include drainage by sump pumps.
 No backfill should be placed against concrete until minimum design strengths are achieved.

It should be noted that the allowable bearing and lateral bearing values presented in Table 7-1 are based on level conditions at the toe. Modified design parameters can be presented for retaining walls with sloping condition at the toe. Other conditions should be evaluated on a case-by-case basis. 1909

RETAINING WALL BACKFILL DETAIL
NATIVE

BACKFILL
*OR AS MODIFIED
12 IN. MIN.

NATIVE OR

SELECT BACKFILL
/

BY A SPECIFIC REPORT
G)
rH/2 MIN.
. . .. ~ . . . .. . . • ... .. 0 d •
••:.· .- ,· ... '· ·:.

PROVIDE

DRAINAGE
SWALE

H DRAIN LATERALLY,

OR PROVIDE WEEP

HOLES AS REQUIRED

TO DRAIN
PIPE: 4-INCH PERFORATED PVC, SCHEDULE 40, SDR35 OR APPROVED ALTERNATE MINIMUM 8 PERFORATIONS (1/4-IN. DIA.) PER LINEAL FT. IN BOTTOM HALF OF PIPE
ROCK: MINIMUM VOLUME OF 1 CU. FT. OF 3/4-IN. MAX. ROCK PER. LINEAL FOOT

OF PIPE, OR APPROVED ALTERNATE
FILTER FABRIC: MIRAFI 140 FILTER FABRIC OR APPROVED EQUIVALENT A~ AL TA CALIFORNIA GEOTECHNICAL, INC , /L'\_'_'\ VER. 1/10 PATH:S:\Draftlng\ALTA GEOTECHNICAL\GRADING DETAILS\PLATE A,dwg

PLATE A
1910
Project Number 1-0631 Page 22
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.7 Exterior Slabs and Walkways
Exterior concrete slabs and walkways should be designed and constructed in consideration of the following recommendations.

7.7.1 Subgrade Compaction
The subgrade below exterior concrete slabs should be compacted to a minimum of 90 percent relative compaction as determined by ASTM Test Method: D 1557.

7.7.2 Subgrade Moisture
The subgrade below concrete slabs should be moisture conditioned to a minimum of 110 percent (low expansion potential) or 120 percent (medium expansion potential) of optimum moisture prior to concrete placement

7.7.3 Concrete Slab Thickness
Concrete flatwork and driveways should be designed utilizing four-inch minimum thickness.

7.7.4 Concrete Slab Reinforcement
Utilization of reinforcement for flatwork and driveways is subject to a cost/benefit analysis. Reinforcement will decrease the amount of cracking that may occur in flatwork, however, planning for occasional repairs may be more cost effective. Utilizing closely spaced control joints is likely more cost-effective than utilizing reinforcement. The majority of the soils onsite are classified as very low in expansion potential.

Consideration should be given to reinforcing flatwork with irregular (nonsquare/rectangular) shapes or flatwork underlain by medium expansive soils. Reinforcement may consist of 6x6 W.14/W1.4 welded wire mesh or an equivalent section of rebar.
1911
Project Number 1-0631 Page 23
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.7.5 Control Joints
Weakened plane joints should be installed on walkways at intervals of approximately eight feet (maximum) or less. Exterior slabs should be designed to withstand shrinkage of the concrete.

7.8 Concrete Design
As stated in Section 5.1.7, negligible concentrations of sulfates were detected in the onsite soils (Class S0). Therefore, the use of sulfate resistant concrete is not required per ACI 318-14 at this time. Post-grading conditions should be evaluated, and final recommendations made at that time.

7.9 Corrosion
Based on laboratory results of soluble sulfate, chloride, and pH testing as presented in Appendix C, the onsite soils are classified as “non-corrosive” to buried metals and concrete (Caltrans, 2022). Buried ferrous metals should be protected against the effects of corrosive soils in accordance with the manufacturer’s recommendations. Typical measures may include using noncorrosive backfill, protective coatings, wrapping, plastic pipes, or a combination of these methods. A corrosion engineer should be consulted if specific design recommendations are required by the improvement designer.

Per ACI 318-14, an exposure class of C1 would be applicable to metals encased in concrete (rebar in footings) due to being exposed to moisture from surrounding soils. Per Table 19.3.2.1 of ACI 318-14, the requirements for concrete with an exposure class of C1 are a minimum compressive strength of 2500 psi and a maximum water-soluble chloride ion content in concrete of 0.30 (percent by weight of cement).

1912
Project Number 1-0631 Page 24
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

7.10 Pavement Design
Pavement sections for the proposed streets shall be designed based on laboratory testing conducted on samples taken from the soil subgrade.

Preliminarily, based on an assumed R-Value of 30, the pavement may be designed utilizing the sections presented in Table 7-5. These sections should be verified upon the completion of grading, based on R-Value testing. The ultimate pavement section design for public streets is under the City of Aliso Viejo’s purview.

Table 7-5
Preliminary Pavement Sections
Traffic
Index
Pavement Section Options
OR

5.0 3-inch AC on 6-inch AB 4-inch AC on 4-inch AB

5.5 3-inch AC on 7-inch AB 4-inch AC on 5-inch AB
AC-Asphalt Concrete
AB-Caltrans Class II Base
Construction of the streets should be accomplished in accordance with the current criteria of the City of Aliso Viejo. Prior to the placement of base material, the subgrade should be suitably moisture conditioned, processed and compacted to a minimum 95 percent of the laboratory maximum density (ASTM:

D 1557) to at least twelve (12) inches below subgrade. After subgrade compaction, the exposed grade should then be "proof"-rolled with heavy equipment to ensure the grade does not "pump" and is verified as non-yielding.

Aggregate base material should be placed on the compacted subgrade and compacted in-place to a minimum 95 percent of the laboratory standard obtained per ASTM: D 1557.

I
I
1913
Project Number 1-0631 Page 25
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

8.0 LOT MAINTENANCE
Ongoing maintenance of the improvements is essential to the long-term performance of structures. As such, the owners must implement certain maintenance procedures. The attached " Maintenance and Improvement Considerations" presented in the Appendix E may be included as part of the sales packet to educate the owners in issues related to drainage, maintenance, improvements, etc. The following recommendations should also be implemented.

8.1 Lot Drainage
Roof, pad, and lot drainage should be collected and directed away from structures and slopes and toward approved disposal areas. Design fine grade elevations should be maintained throughout the life of the structure or if design fine grade elevations are altered, adequate area drains should be installed in order to provide rapid discharge of water, away from structures and slopes.

Residents should be made aware that they are responsible for maintenance and cleaning of all drainage terraces, down drains, and other devices that have been installed to promote structure and slope stability.

8.2 Burrowing Animals
Owners should undertake a program for the elimination of burrowing animals.

9.0 FUTURE PLAN REVIEWS
This report represents a geotechnical review of the site. As the project design for the project progresses, site specific geologic and geotechnical issues should be considered in the design and construction of the project. Consequently, future plan reviews may be necessary. These reviews may include reviews of:
 Grading Plans
 Foundation Plans
 Utility Plans
These plans should be forwarded to the project Geotechnical Consultant for review. 1914
Project Number 1-0631 Page 26
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

10.0 CLOSURE

10.1 Geotechnical Review
For the purposes of this report, multiple working hypotheses were established for the project, utilizing the available data and the most probable model is used for the analysis. Future information collected during the proposed grading operations is intended to evaluate the hypothesis and as such, some of the assumptions summarized in this report may need to be changed. Some modifications of the grading recommendations may become necessary, should the conditions encountered in the field differ from the conditions hypothesized in this report.

Plans and sections of the project specifications should be reviewed by Alta to evaluate conformance with the intent of the recommendations contained in this report. If the project description or final design varies from that described in herein, Alta must be consulted regarding the applicability of the recommendations contained herein and whether any changes are required. Alta accepts no liability for any use of its recommendations if the project description or final design varies and Alta is not consulted regarding the alterations.

10.2 Limitations
This report is based on the following: 1) the project as presented on the attached plan; 2) the information obtained from Alta's laboratory testing included herein; and 3) from the information presented in the referenced reports. The findings and recommendations are based on the results of the subsurface investigation, laboratory testing, and office analysis combined with an interpolation and extrapolation of conditions between and beyond the subsurface excavation locations. However, the materials adjacent to or beneath those observed may have different characteristics than those observed, and no precise representations are made as to the quality or extent of the materials not 1915
Project Number 1-0631 Page 27
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
observed. The results reflect an interpretation of the direct evidence obtained.

Work performed by Alta has been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the geotechnical profession currently practicing in the same locality under similar conditions. No other representation, either expressed or implied, and no warranty or guarantee is included or intended.

The recommendations presented in this report are based on the assumption that an appropriate level of field review will be provided by a geotechnical consultant who is familiar with the design and site geologic conditions. That field review shall be sufficient to confirm that geotechnical and geologic conditions exposed during grading are consistent with the geologic representations and corresponding recommendations presented in this report.

The conclusions and recommendations included in this report are applicable to the specific design of this project as discussed in this report. They have no applicability to any other project or to any other location and any and all subsequent users accept any and all liability resulting from any use or reuse of the data, opinions, and recommendations without the prior written consent of Alta.

Alta has no responsibility for construction means, methods, techniques, sequences, procedures, safety precautions, programs in connection with the construction, acts or omissions of the CONTRACTOR or any other person performing any of the construction, or for the failure of any of them to carry out the construction in accordance with the final design drawings and specifications. 1916
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX A

REFERENCES
1917
Project Number 1-0631 Page A-1
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX A
Selected References
California Code of Regulations, 2022, California Building Code, Title 24, Part 2, Volume 2, Based on the 2021 International Building Code, Effective Date January 1, 2023.

California Department of Conservation, Division of Mines and Geology, 2001, Seismic Hazard Zone Report for the San Juan Capistrano 7.5-Minute Quadrangle, Orange County, California, Seismic Hazard Zone Report 053.

California Department of Transportation (Caltrans), 2022, Caltrans Geotechnical Manual, published March, 2022.

California Geological Survey, 2008, Guidelines for Evaluating and Mitigating Seismic Hazards in California, Special Publication 117A.

California Geological Survey, 2018, Earthquake Fault Zones, A guide for Government Agencies, Property Owners/Developers, and Geoscience Practitioners for Assessing Fault Rupture Hazards in California, Special Publication 42, revised 2018, 83 pages.

Historic Aerials, 2025, www.historicaerials.com, by NETROnline, Copyright 1999-2025, accessed August 2025, online review of vintage air photos from 1938-2022.

Idriss, I.M. and Boulanger, R.W., 2008, Soil Liquefaction during Earthquakes, Oakland, California: Earthquake Engineering Research Institute.

Ishihara, K., and Yoshimine, M., 1992, Evaluation of settlements in sand deposits following liquefaction during earthquakes: Soil and Foundations, Japanese Society of Soil Mechanics and Foundation Engineering, v. 32, n. 1, p. 173-188.

Jennings, C.W., and Bryant, W.A., 2010, Fault Activity Map of California: California Geological Survey Geologic Data Map No. 6, map scale 1:750,000.

Jennings, C. W., and Bryant, W.A., 2010, An explanatory text to accompany the 1:750,000 scale fault and geologic map of California: California Division of Mines and Geology, special publication 42, revised 1985, 24 p.

Jennings, C. W., 1985, An explanatory text to accompany the 1:750,000 scale fault and geologic maps of California: California Division of Mines and Geology, Bulletin 201, 197 p.

U.S. Geological Survey, 2008, National Seismic Hazards Maps – Source Parameters, http://geohazards.usgs.gosv/cfusion/hazfaults_2008_search/query_main.cfm. 1918
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX B
Subsurface Investigation
1919
Project Number 1-0631 Page B-1
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX B
Subsurface Investigation
Alta's subsurface investigation consisted of excavating, logging, and sampling four (4) hollowstem auger borings. Details of the subsurface investigation are presented in Table B. The approximate location of the exploratory excavation is shown on the accompanying Plate 1 and the Geotechnical Logs are attached.

TABLE B

SURFACE INVESTIGATION DETAILS
Equipment Range of
Depths
Sampling Methods Sample Locations
8” HollowStem Auger Up to 51.5
feet

1. Bulk

2. Ring

1. Bulk-Select Depths.

2. Ring-Every 2.5 or 5 feet.
1920

UNIFIED SOIL CLASSIFICATION SYSTEM
Major Divisions grf ltr Description Major Divisions grf ltr ,-
. I GW Well-graded gravels or gravel sand
Gravel • mixtures, little or no fines
and
Gravelly -- Poorly-graded gravels or gravel
Soils I';., GP sand mixture, little or no fines
: • GM Silty gravels, gravel--sand-silt Fine
Silts
And
Clays
LL,<50
Inorganic silts and very fine sands,
ML rock flour, silty or clayey fine sands
or clavev silts with sliaht olasticitv
Inorganic clays of low to medium
plasticity, gravelly clays , sandy
clays, silty clays, lean clays
Coarse More
than 50%
of coarse
fraction
retained
on No,. 4
• mixtures
liiii,,+-+---- - --- - - ----1 Grained
~; GC
Organic silts and organic silt-clays
OL of low plasticity
Grained
sieve
Clayey gravels, gravel-sand-clay
mixtures Soils
Soils
/~. SW Well-gr~ded sands or gravelly More than
Sand f-i sands, little or no fines 50% passes Silts
And
Inorganic silts, micaceous or
MH diatomaceous fine or silty soils,
elastic silts
More than
50%
retained on
No. 200
sieve
and i;a•..,··_,· i---+-------- - - ----.1 0 11 No. 200 Inorganic clays of high plasticity, VH fat clays Sandy ···- Poorly-graded sands or gravelly sieve Soils • .• .-.-· SP sands. little or no fines · . •
_. •. SM Silty sands, sand-silt mixtures . •, ....

Clays ~
LL, <50 l"'f'',f---t---------------t
Organic clays of medium to high
OH plasticity More
than SO%
or coarse
fraction
passes
on No., 4 ~ sc Clayey sands, and-clay mixtures Highly Organic ::, PT Peat and other highly organic soils Soils - sieve
BOUNDARY CLASSIFICATION: Soils possessing characteristics of two groups are designated by combinations of group symbols.

PARTICLE SIZE LIMITS
U.S. STANDARD SERIES SIEVE CLEAR SQUARE SIEVE OPENINGS
200 40 10 4 3/4"
Silts
and
Clays Fine I

RELATIVE DENSITY
Sands and Gravels
Very Loose
Loose
Medium Dense
Dense
Very Dense
Blows/Foot (SPT)
<4
4-10
11-30
31-50
>50

LABO RA TORY TESTS
Symbol Test
Sand
Medium
Gravel
I Coarse Fine I Coarse

CONSISTENCY CLASSIFICATION
Silts and Clays. Criteria
Very Soft Thumb penetrates soil >1 in.

Soft Thumb penetrates soil 1 in.

Firm Thumb penetrates soil 1 /4 in.

Stiff Readily indented with thumbnail
Very Stiff Thumbnail will not indent soil
3" 12"
Cobbles Boulders

HARDNESS
Bedrock
Soft
Moderately Hard
Hard
Very Hard
DS
DSR
CON
SA
MAX
RV
Direct Shear SOIL MOISTURE SIZE PROPORTIONS
El
SE
AL
CHEM
HY
Direct Shear
(Remolded)
Sieve Analysis
Maximum Density
Resistance (R) Value
Expansion Index
Sand Equivalent
Atterberg Limits
Chemical Analysis
Hydrometer Analysis
Increasing Visual Moisture Content
l
Dry - Dry to touch
Moist - Damp, but no visible free water
wet - Visible free water
Trace - <5%
Few- 5 to 10%
Some - 15 to 25%
KEY TO EXPLORATORY BORING LOGS ~LTA CALIFORNIA GEOTECHNICAL INC.

PLATE 1921 B
SM
SC
CL
SM
SC
SP

34.7 40.9

42.1 6.6

66.6 7.6

17.4 8.6
MONTEREY FORMATION (Tm): SILTY SANDSTONE, fine
grained, pale brown to white, slightly moist, medium dense, diatomaceous.
@2.5 ft. CLAYEY SANDSTONE, pale brown to white, moist, medium dense, diatomaceous.
@5.0 ft. white, slightly moist, dense, diatomaceous, some clay. @10.0 ft. dark brown, moist, dense.
@15.0 ft. dark brown to bluish gray, slightly moist, dense. @20.0 ft. SANDY CLAYSTONE, gray, moist, stiff, fine grained sand. @25.0 ft. SILTY SANDSTONE, fine grained, yellowish dark brown, slightly moist, very dense.
@30.0 ft. CLAYEY SANDSTONE, fine grained, dark brown to brown, moist, medium dense.
@35.0 ft. SANDSTONE, very fine to fine grained, pale brown, slightly moist, very dense.

Continued;
R
R
R
R
R
R
S
S
26 43
36 33
22 83
10,9,8
17,40,50
for 4"
83 31
90 30
91 40
MAX,
EI,
HY,
CHEM
CON,
HY
78 37
74 105
56 110
140 lbs
15 Argonaut
1 OF 2
30 in
460 B-1
5 10
15 20
25 30
35 TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
460
455
450
445
440
435
430
425
420

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-1
□
□
□ □ 1922

10.0 8.7

20.1 Continued;
MONTEREY FORMATION (Tm) SANDSTONE, very fine to fine
grained, pale brown, slightly moist, very dense.
@50.0 ft. yellowish brown.

TOTAL DEPTH 51.5 FEET

NO GROUNDWATER ENCOUNTERED

NO CAVING OBSERVED
S
S
S
26,50 for
5"
29,50 for
5"
23,50 for
4"
140 lbs
15 Argonaut
2 OF 2
30 in
460 B-1
45 50

TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
420
415
410

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-1
-
-
-
-
-
-
-
-
-
-
-
□
□
□
-
-
-
-
->--
-
-
-
-
->--
-
-
-
~
□ 1923
SP

9.0 7.2

8.7 6.5

5.3 5.7

7.3 6.9
MONTEREY FORMATION (Tm): SANDSTONE, fine grained,
grayish pale brown, slightly moist, dense.
@5.0 ft. medium dense, trace gravel.
@10.0 ft. very dense, some gravel.
@15.0 ft. very fine to fine grained, pale brown.
@25.0 ft. yellowish gray, some iron oxide staining.
@30.0 ft. pale brown, some iron oxide staining.
@35.0 ft. trace silt.

Continued;
R
R
R
R
R
R
S
S
41 27
53 50 for 5"
50 for 5"
50 for 4"
40,50 for
2"
47,50 for
3"
43 30
41 21
18 20
107
102
105
90 92
94 140 lbs
15 Argonaut
1 OF 2
30 in
461 B-2
5 10
15 20
25 30
35 TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
460
455
450
445
440
435
430
425

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-2
- -
- -
- -
- -
- ->-- -
- ->--
- -
- -
- -
- ->-- -
- ->--
- -
- -
- -
- ->-- -
- ->--
- -
- -
- -
- ->-- -
- ->--
- -
- -
- -
- ->-- -
- ->--
- -
- -
- -
- ->-- -
- -
- -
- -
- -
- ->-- -
- -
- -
- -
- -
_y:
□ ►
□
□ □ 1924

9.6 13.2

9.4 Continued;
MONTEREY FORMATION (Tm): SAND, very fine to fine grained, pale brown, slightly moist, very dense, trace silt, some iron oxide staining.

TOTAL DEPTH 51.5 FEET

NO GROUNDWATER ENCOUNTERED

NO CAVING OBSERVED
S
S
S
36,50 for
3"
33, 50
for 4"
32,50 for
4"
140 lbs
15 Argonaut
2 OF 2
30 in
461 B-2
45 50

TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
420
415
410

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-2
-
-
-
-
-
-
-
-
-
-
-
□
□
□
-
-
-
-
->--
-
-
-
-
->--
-
-
-
~
□ 1925
SC
SM

61.0 35.7

58.9 50.4

30.5 11.5
MONTEREY FORMATION (Tm): CLAYEY SANDSTONE, fine
grained, gray to white, moist, medium dense, diatomaceous. @5.0 ft. dark brown to grayish white.
@10.0 ft. some iron oxide staining.
@20.0 ft. dark grayish brown.
@25.0 ft. SILTY SANDSTONE, fine grained, brown, moist, medium dense.

TOTAL DEPTH 26.0 FEET

NO GROUNDWATER ENCOUNTERED

NO CAVING OBSERVED
R
B
R
R
R
R
R
24 24
21 26
25 26
84 78
87 93
89 55
CON,
HY
MAX,
EI,
HY,
CHEM
57 75
59 68
87 106
140 lbs
15 Argonaut
1 OF 1
30 in
458 B-3
5 10
15 20
25 TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
455
450
445
440
435

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-3
□
□
□ □ 1926
SC
CL
CL
SC
CL

68.4 76.8

34.9 64.4

49.1 41.8
MONTEREY FORMATION (Tm): CLAYEY SANDSTONE, fine
grained, pale brown to white, moist, medium dense, diatomaceous. @10.0 ft. CLAYSTONE TO SANDY CLAYSTONE, dark brown to
brown, moist, very stiff.
@15.0 ft. SANDY CLAYSTONE, dark brown to brown, moist, very stiff.
@20.0 ft. CLAYEY SANDSTONE, very fine to fine grained, bluish gray, moist, medium dense.
@25.0 ft. SANDY CLAYSTONE, brown to dark brown, moist, very stiff, some iron oxide staining.

TOTAL DEPTH 26.0 FEET

NO GROUNDWATER ENCOUNTERED

NO CAVING OBSERVED
R
R
R
R
R
R
21 24
20 30
23 20
90 87
81 82
92 87
CON,
HY
CON,
HY
55 50
77 54
68 73
140 lbs
15 Argonaut
1 OF 1
30 in
459 B-4
5 10
15 20
25 TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
455
450
445
440
435

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-4
□
□
□ □ 1927
SC MONTEREY FORMATION (Tm): CLAYEY SANDSTONE, fine
grained, pale brown to white, moist, medium dense, diatomaceous.

TOTAL DEPTH 5.0 FEET

NO GROUNDWATER ENCOUNTERED

NO CAVING OBSERVED
N/A
15 Argonaut
1 OF 1
N/A
458 P-1
5 TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
455

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-5
-
-
-
-
-
□
□
□
-
-
-
-
-
□ 1928
SC MONTEREY FORMATION (Tm): CLAYEY SANDSTONE, fine
grained, pale brown to white, moist, medium dense, diatomaceous.

TOTAL DEPTH 5.0 FEET

NO GROUNDWATER ENCOUNTERED

NO CAVING OBSERVED
N/A
15 Argonaut
1 OF 1
N/A
460 P-2
5 TYPE OF DRILL RIG
DRILLER TYPE SAMPLE ELEV DRY (pcf) DENSITY
BORING DESIG.

DROP
DRIVE WT.

GW DEPTH (FT)

PROJECT NAME
DATE FINISHED YH DEPTH SAT- MOISTURE CONT (%)8/27/25
(%) URATION
DATE STARTED 8/27/25
460
455

GEOTECHNICAL DESCRIPTION OTHER TESTS

S SPT (SPLIT SPOON) SAMPLE

R RING (DRIVE) SAMPLE
SAMPLE TYPES:

SHEET
NOTE

LOGGED BY GROUP
J: JOINTING
B: BEDDING
S: SHEAR
C: CONTACT
F: FAULT
RS: RUPTURE SURFACE
1-0631

GROUNDWATER

SEEPAGE
(Feet)
PROJECT NO.

GEOTECHNICAL BORING LOG
GROUND ELEV.
8" Hollow Stem Auger
2R Drilling Inc. SYMBOL LITHOLOGY BLOWS

B BULK SAMPLE T TUBE SAMPLE
Alta California Geotechnical, Inc.

P.N. 1-0631 PLATE B-6
-
-
-
-
-
□
□
□
-
-
-
-
-
□ 1929
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX C
Laboratory Testing
1930
Project Number 1-0631 Page C-1
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

LABORATORY TESTING
The following laboratory tests were performed on a representative sample in accordance with the applicable latest standards or methods from the ASTM, California Building Code (CBC) and California Department of Transportation.

Classification
Soils were classified with respect to the Unified Soil Classification System (USCS) in accordance with ASTM D-2487 and D-2488.

Particle Size Analysis
Modified hydrometer testing was conducted to aid in classification of the soil. The results of the particle size analysis are presented in Table C.

Maximum Density/Optimum Moisture
The maximum dry density and optimum moisture content of two representative bulk samples were evaluated in accordance with ASTM D-1557. The results are summarized in Table C.

Expansion Index Tests
Two (2) expansion index test was performed to evaluate the expansion potential of typical onsite soil. Testing was carried out in general conformance with ASTM Test Method D-4829. The results are presented in Table C.

Chemical Analyses
Chemical testing was performed on two select samples by Alta. The results of these tests (sulfate content, resistivity, chloride content and pH) are presented on Table C.

Consolidation Tests
Consolidation testing was performed on four (4) relatively “undisturbed” soil samples at their natural moisture content in accordance with procedures outlined in ASTM D-2435. The samples were placed in a consolidometer and loads were applied incrementally in geometric progression. The samples (2.42-inches in diameter and 1-inch in height) were permitted to 1931
Project Number 1-0631 Page C-2
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
consolidate under each load increment until the slope of the characteristic linear secondary compression portion of the thickness versus log of time plot was apparent. The percent consolidation for each load cycle was recorded as the ratio of the amount of vertical compression to the original 1-inch height. The consolidation test results are shown on Plates C1 through C-4.

Atterberg Limits
Atterberg limits testing was performed on two select samples by Alta. The results of these tests are presented on Table C
1932
Trench No.

Depth (Feet) Soil Description Group Symbol - Unified Soil Classification System Maximum Density (pcf) Optimum Moisture (%) Direct Shear Gravel (% + No. 4 Screen) % Sand %Silt (0.074 to 0.005mm) % Clay (-0.005 mm) Expansion IndexSulfate Content (%) Consolidation Other Tests Remarks B-1 2.5 Clayey Sandstone (Tm) SC 114.4 12.5 - 2 60 12 26 8 - MinResist: 1,619Ohm-cm
pH:7.4,Cl:115ppm,SO4:0.012%
LL:26,PL:16,PI:10
B-1 5 Claystone (Tm) CL - - - 0 14 34 52 - SEE PLATE C-1 B-3 5 Claystone with Sand (Tm) CL - - - 1 24 32 43 - SEE PLATE C-2 B-3 (Bulk) 5 Claystone with Sand (Tm) CL 77.0 35.6 - 5 20 23 52 38 MinResist: 1,485Ohm-cm
pH:7.4,Cl:195ppm,SO4:0.006%
LL:67,PL:44,PI:23
B-4 5 Claystone (Tm) CL - - - 1 10 34 55 - SEE PLATE C-3 B-4 10 Claystone (Tm) CL - - - 0 12 34 54 - SEE PLATE C-4

TABLE C

SUMMARY OF LABORATORY TEST DATA
P.N. 1-0631
Maximum Dry Density Grain Size Analysis
Alta California Geotechnical, Inc.
1933
-2.0
-1.0
0 1.0

2.0 3.0

4.0 5.0

6.0 7.0

8.0 0.1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 910
REMARKS: WATER ADDED AT 1.07 TSF

CONSOLIDATION CURVE PERCENT CHANGE IN HEIGHT
PLATE C-1

COMPRESSIVE STRESS IN TSF
Alta California Geotechnical, Inc.

P.N. 1-0631
group typical names density (pcf) sieve (%) symbol

40.9 moist. (%)
dry in situ depth (ft.)
B-1 5.0
satur. (%)
37 -200
CL Claystone (Tm)
boring in situ
31 86
- -
- --- - - - ' '

I I I I I I I I I
1934
-2.0
-1.0
0 1.0

2.0 3.0

4.0 5.0

6.0 7.0

8.0 0.1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 910
REMARKS: WATER ADDED AT 1.07 TSF

CONSOLIDATION CURVE PERCENT CHANGE IN HEIGHT
PLATE C-2

COMPRESSIVE STRESS IN TSF
Alta California Geotechnical, Inc.

P.N. 1-0631
group typical names density (pcf) sieve (%) symbol

35.7 moist. (%)
dry in situ depth (ft.)
B-3 5.0
satur. (%)
75 -200
CL Claystone with Sand (Tm)
boring in situ
78 75
~
--- -

I I I I I I I I I
1935
-2.0
-1.0
0 1.0

2.0 3.0

4.0 5.0

6.0 7.0

8.0 0.1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 910
REMARKS: WATER ADDED AT 1.07 TSF

CONSOLIDATION CURVE PERCENT CHANGE IN HEIGHT
PLATE C-3

COMPRESSIVE STRESS IN TSF
Alta California Geotechnical, Inc.

P.N. 1-0631
group typical names density (pcf) sieve (%) symbol

76.8 moist. (%)
dry in situ depth (ft.)
B-4 5.0
satur. (%)
50 -200
CL Claystone (Tm)
boring in situ
87 89
- '
'
' "
-" - '
' ' - -
-
' " '
'
' ' " ' ' ' " ' '
-

I I I I I I I I I
1936
-2.0
-1.0
0 1.0

2.0 3.0

4.0 5.0

6.0 7.0

8.0 0.1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 910
REMARKS: WATER ADDED AT 1.07 TSF

CONSOLIDATION CURVE PERCENT CHANGE IN HEIGHT
PLATE C-4

COMPRESSIVE STRESS IN TSF
Alta California Geotechnical, Inc.

P.N. 1-0631
group typical names density (pcf) sieve (%) symbol

34.9 moist. (%)
dry in situ depth (ft.)
B-4 10.0
satur. (%)
77 -200
CL Claystone (Tm)
boring in situ
81 88
' '
'
'
'~
-
--,-

I I I I I I I I I
1937
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX D
Maintenance and Improvement Considerations
1938
Project Number 1-0631 Page D-1
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

MAINTENANCE AND IMPROVEMENT CONSIDERATIONS
General
Owners purchasing property must assume a certain degree of responsibility for improvements and for maintaining conditions around their home. Of primary importance from a geotechnical standpoint are maintaining drainage patterns and minimizing the soil moisture variation below all improvements. Such design, construction and owner maintenance provisions may include:
 Employing contractors for improvements who design and build in recognition of local building codes and specific site soils conditions.
 Establishing and maintaining positive drainage away from all foundations, walkways, driveways, patios, and other improvements.
 Avoiding the construction of planters adjacent to structural improvements.

Alternatively, planter sides/bottoms can be sealed with an impermeable membrane and drained away from the improvements via subdrains into approved disposal areas.  Sealing and maintaining construction/control joints within concrete slabs and walkways to reduce the potential for moisture infiltration into the subgrade soils.  Utilizing landscaping schemes with vegetation that requires minimal watering. Watering should be done in a uniform manner, as equally as possible on all sides of the foundation, keeping the soil "moist" but not allowing the soil to become saturated.  Maintaining positive drainage away from structures and providing roof gutters on all structures with downspouts that are designed to carry roof runoff directly into area drains or discharged well away from the foundation areas.  Avoiding the placement of trees closer to the proposed structures than a distance of one-half the mature height of the tree.
 Observation of the soil conditions around the perimeter of the structure during extremely hot/dry or unusually wet weather conditions so that modifications can be made in irrigation programs to maintain relatively uniform moisture conditions.

1939
Project Number 1-0631 Page D-2
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.

Sulfates
Owners should be cautioned against the import and use of certain inorganic fertilizers, soil amendments, and/or other soils from offsite sources in the absence of specific information relating to their chemical composition. Some fertilizers have been known to leach sulfate compounds into soils and increase the sulfate concentrations to potentially detrimental levels.

Site Drainage
 The owners should be made aware of the potential problems that may develop when drainage is altered through construction of hardscape improvements. Ponded water, drainage over the slope face, leaking irrigation systems, overwatering, or other conditions which could lead to ground saturation must be avoided.  No water should be allowed to flow over the slopes. No alteration of pad gradients should be allowed that would prevent pad and roof runoff from being directed to approved disposal areas.
 Drainage patterns have been established at the time of the fine grading should be maintained throughout the life of the structure. No alterations to these drainage patterns should be made unless designed by qualified professionals in compliance with local code requirements and site-specific soils conditions.

Slope Drainage
 Residents should be made aware of the importance of maintaining and cleaning all interceptor ditches, drainage terraces, down drains, and any other drainage devices, which have been installed to promote slope stability.
 Subsurface drainage pipe outlets may protrude through slope surfaces and/or wall faces. These pipes, in conjunction with the graded features, are essential to slope and wall stability and must be protected in-place. They should not be altered or damaged in any way.

Planting and Irrigation of Slopes
 Seeding and planting of the slopes should be planned to achieve, as rapidly as possible, a well-established and deep-rooted vegetal cover requiring minimal watering.  It is the responsibility of the landscape architect to provide such plants initially and of the residents to maintain such planting. Alteration of such a planting scheme is at the resident's risk.
 The resident is responsible for proper irrigation and for maintenance and repair of properly installed irrigation systems. Leaks should be fixed immediately. 1940
Project Number 1-0631 Page D-3
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
 Sprinklers should be adjusted to provide maximum uniform coverage with a minimum of water usage and overlap. Overwatering with consequent wasteful runoff and serious ground saturation must be avoided.
 If automatic sprinkler systems are installed, their use must be adjusted to account for seasonal and natural rainfall conditions.

Burrowing Animals
 Residents must undertake a program to eliminate burrowing animals. This must be an ongoing program in order to promote slope stability.

Owner Improvement
Owner improvements (pools, spas, patio slabs, retaining walls, planters, etc.) should be designed to account for the terrain of the project, as well as expansive soil conditions and chemical characteristics. Design considerations on any given lot may need to include provisions for differential bearing materials, ascending/descending slope conditions, bedrock structure, perched (irrigation) water, special geologic surcharge loading conditions, expansive soil stresses, and long-term creep/settlement.

All owner improvements should be designed and constructed by qualified professionals utilizing appropriate design methodologies, which account for the on-site soils and geologic conditions.

Each lot and proposed improvement should be evaluated on an individual basis.

Setback Zones
Manufactured slopes maybe subject to long-term settlement and creep that can manifest itself in the form of both horizontal and vertical movement. These movements typically are produced as a result of weathering, erosion, gravity forces, and other natural phenomenon. A setback adjacent to slopes is required by most building codes, including the California Building Code. This zone is intended to locate and support the residential structures away from these slopes and onto soils that are not subject to the potential adverse effects of these natural phenomena.

The owner may wish to construct patios, walls, walkways, planters, swimming pools, spas, etc. within this zone. Such facilities may be sensitive to settlement and creep and should not be 1941
Project Number 1-0631 Page D-4
September 26, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
constructed within the setback zone unless properly engineered. It is suggested that plans for such improvements be designed by a professional engineer who is familiar with grading ordinances and design and construction requirements. In addition, we recommend that the designer and contractor familiarize themselves with the site specific geologic and geotechnical conditions on the specific lot.
1942
ALTA CALIFORNIA GEOTECHNICAL, INC.

APPENDIX E
Earthwork Specifications

1943
ALTA CALIFORNIA GEOTECHNICAL, INC.

EARTHWORK SPECIFICATIONS
These specifications present the generally accepted standards and minimum earthwork requirements for the development ofthe project. These specifications shall be the project guidelines for earthwork except where specifically superseded in preliminary geology and soils reports, grading plan review reports or by the prevailing grading codes or ordinances of the controlling agency.

A. GENERAL

1. The Contractor shall be responsible for the satisfactory completion of all earthwork in accordance with the project plans and specifications.

2. The project Geotechnical Engineer and Engineering Geologist, or their representatives, shall provide observation and testing services, and Geotechnical consultation forthe duration ofthe project.

3. All clearing, grubbing, stripping and site preparation for the project shall be accomplished by the Contractor to the satisfaction of the Geotechnical Engineer/Engineering Geologist.

4. It is the Contractor's responsibility to prepare the ground surface to receive fill to the satisfaction of the Geotechnical Engineer and to place, spread, mix, moisture condition, and compact the fill in accordance with the job specifications and as required by the Geotechnical Engineer. The Contractor shall also remove all material considered by the Geotechnical Engineer to be unsuitable for use in the construction of engineered fills.

5. The Contractor shall have suitable and sufficient equipment in operation to handle the amount of fill being placed. When necessary, equipment will be shut down temporarily in order to permit the proper preparation of fills.

B. PREPARATION OF FILL AREAS

1. Excessive vegetation and all deleterious material should be disposed of offsite as required by the Geotechnical Engineer.

Existing fill, soil, alluvium or rock materials determined by the Geotechnical Engineer as being unsuitable for placement in compacted fills shall be removed and hauled from the site. Where applicable, the Contractor may obtain the ALTA CALIFORNIA GEOTECHNICAL, INC.
1944
Earthwork Specifications
Page2
approval of the Soils Engineer and the controlling authorities for the project to dispose of the above described materials, or a portion thereof, in designated areas onsite.

After removal of the deleterious materials have been accomplished, earth materials deemed unsuitable in their natural, in-place condition, shall be removed as recommended by the Geotechnical Engineer/Engineering Geologist.

2. Upon achieving a suitable bottom for fill placement, the exposed removal bottom shall be disced or bladed by the Contractor to the satisfaction of the Geotechnical Engineer. The prepared ground surfaces shall then be brought to the specified moisture content mixed as required, and compacted and tested as specified. In localities where it is necessary to obtain the approval of the controlling agency prior to placing fill, it will be the Contractor's responsibility to contact the proper authorities to visit the site.

3. Any underground structure such as cesspools, cisterns, mining shafts, tunnels, septic tanks, wells, pipelines or other structures not located prior to grading are to be removed ortreated in a manner prescribed by the Geotechnical Engineer and/or the controlling agency for the project.

C. ENGINEERED FIUS

1. Any material imported or excavated on the property may be utilized as fill, provided the material has been determined to be suitable by the Geotechnical Engineer. Deleterious materials shall be removed from the fill as directed by the Geotechnlcal Engineer.

2. Rock or rock fragments less than twelve inches in the largest dimension may be utilized in the fill, provided they are not placed in concentrated pockets and the distribution of the rocks is approved by the Geotechnical Engineer.

3. Rocks greater than twelve inches in the largest dimension shall be taken offsite, or placed in accordance with the recommendations of the Geotechnical Engineer in areas designated as suitable for rock disposal.

4. All materials to be used as fill, shall be tested in the laboratory by the Geotechnical Engineer. Proposed import materials shall be approved by the Geotechnical Engineer 48 hours prior to importation.

5. The fill materials shall be placed by the Contractor in lifts, that when compacted, shall not exceed six inches. Each lift shall be spread evenly and shall be Al.TA CALIFORNIA GEOTECHNICAL, INC.
1945
Earthwork Specifications

Page 3 ends