1 CITY OF

AMERICAN CANYON

LANDSCAPE AND LIGHTING

DISTRICT ASSESSMENTS

PRESENTATION TO COUNCIL
JUNE 21, 2022
2 Introduction and Purpose of Meeting
Purpose: Conduct a public hearing for the City’s landscape and lighting assessment district as required by the Landscape & Lighting Act of 1972 (the “Code”).
• The Code requires two Council meetings each year in order to place the assessments onto the tax roll.
• Actions tonight will be to conduct the public hearing, accepting testimony from any interested persons.
• At the conclusion of the public hearing, Council may adopt the Resolution, approving the engineer’s report and authorizing the assessments to be placed onto the tax roll for the fiscal year 2022/23.

Previous Action: On June 7, the City Council conducted the first of these meetings, preliminarily approving the Engineer’s Report and announcing the date and time of the public hearing.
3 District Background
• The City’s Landscape District and Lighting (“LLAD”) was established in 2001 and currently consists of three Zones.
• The District was originally formed to provide a funding source for the ongoing maintenance of street lighting and landscaping in the La Vigne subdivision (Zone 1). Since that time, Vintage Ranch and Napa Junction have been annexed into the District, including the Villages at Vintage Ranch Apartments into Zone 2 last year:
• Zone 1 – La Vigne
• Zone 2 – Vintage Ranch
• Zone 3 – Napa Junction
4 5
6 7
Assessment District Summary
Zone
FY 2021-22
Maximum
Assessment
FY 2021-22
Actual
Assessment
FY 2022-23
Maximum
Assessment
FY 2022-23
Actual
Assessment
Zone 1 $626.20 $400.00 $646.31 $400.00
Zone 2 $959.87 $302.42 $990.70 $302.42
Zone 3 - ESD $351.04 $207.56 $362.31 $207.56
Zone 3 - Acre $2,117.54 $1,022.01 $2,185.54 $1,022.01
8 District/Zone Assessment Rates
• Each of the three Zones has an annual escalator built into the assessment methodology, allowing the assessment rates to increase over time.
• Each of the Zones currently has a healthy fund balance but the District improvements (parks, play equipment,
landscaping, medians, fences, etc.) are coming to the end of their useful life and will require replacement over the next few years. An assessment rate increase may be required to fully fund the replacement and continued maintenance of the District improvements. Discussions with staff
concerning this are ongoing.