REGULAR CITY COUNCIL MEETING AGENDA
City Hall - Council Chambers
4381 Broadway St., Suite 201, American Canyon
February 6, 2024
6:30 PM
Tonight's mee(ng is a limited public forum. American Canyon promotes respec/ul and responsible behavior among its mee(ng par(cipants, whether they are present in person or remotely. Using offensive language or remarks that promote, foster, or perpetuate discrimina(on based on race, creed, color, age, religion, gender marital status, status regarding public assistance, na(onal origin, physical or mental disability or sexual orienta(on/gender iden(fica(on, as well as any other category protected by federal, state or local laws will not be tolerated. In the case of an occurrence, the speaker will be immediately disconnected from the microphone.
City Council and other public meengs will be conducted in person at City Hall, 4381 Broadway, Suite 201, American Canyon, CA 94503. This meeng is also available via Zoom Teleconferencing as a convenience for public parcipaon.
This meeng will be broadcast live to residents on Napa Valley TV, on our website here and on YouTube here. Should technical issues with Zoom occur, please select another viewing option.
PUBLIC PARTICIPATION
Oral comments, during the mee(ng: Oral comments can be made in person during Open and Closed Session. A Zoom Webinar has been established for public comments made via zoom, during Open Session only. To give your public comment via zoom, connect via the below Zoom link and use the “raise your hand” tool, or call into the zoom mee-ng at 408-638-0968 and press *9 to “raise your hand” when the item is called. To avoid confusion, all hands raised outside of Public Comment periods will be lowered.
Written comments, via eComments: Please submit wri2en comments through the eComments link, located on the Mee-ngs & Agendas page of our websitehere. Comments will be available to council members in real -me. To allow for review of comments, eComments will close at 3:00 pm on the day of the mee-ng. All comments received will be posted online and become part of the mee-ng record.
Zoom Meeting Link: Click here.
Webinar ID: 862 3299 1024 Passcode: 12345
The above-iden-fied measures exceed all legal requirements for par-cipa-on in public comment, including those imposed by the Ralph M. Brown Act. For more informa-on, please call the Office of the City Clerk at (707) 647-4369 or email [email protected].
AGENDA MATERIALS: City Council agenda materials are published 72 hours prior to the mee-ng and are available to the public via the City’s website at www.cityofamericancanyon.org.
AMERICANS WITH DISABILITIES ACT: The City Council will provide materials in appropriate Mayor: Leon Garcia
Vice Mayor: David Oro
Councilmembers: Mariam Aboudamous, Mark Joseph, Pierre Washington CITY COUNCIL MEETING AGENDA FEBRUARY 6, 2024
1 alterna-ve formats to comply with the Americans with Disabili-es Act. Please send a wri2en request to City Clerk at 4381 Broadway, Suite 201, American Canyon, CA 94503 or by email to [email protected]. Include your name, address, phone number and brief descrip-on of the requested materials, as well as your preferred alterna-ve format or auxiliary aid, at least three calendar days before the meeting.
5:30 P.M. – CLOSED SESSION
The mayor will call the meeng to order and conduct roll call. Council will immediately convene into Closed Session a,er hearing any public comment on Closed Session items. At 6:30 p.m. the Council will reconvene into Open Session and then resume Closed Session at the end of the meeting to address outstanding items, if necessary.
CALL TO ORDER - CLOSED SESSION
ROLL CALL - CLOSED SESSION
PUBLIC COMMENTS - CLOSED SESSION ITEMS
This me is reserved for members of the public to address the City Council on Closed Session Items only. Comments must be made in person and are limited to 3 minutes. Comments for items on the Open Session agenda will be taken when the item is called in Open Session. Comments for Items not on the Closed Session or Open Session agenda will be heard during the Open Session Public Comment period.
MEETING RECESS - COUNCIL TO CONVENE IN CLOSED SESSION
5:30 P.M. CLOSED SESSION ITEMS
1. Conference with Legal Counsel - Exis(ng Li(ga(on. Authorized pursuant to Government Code Section 54956.9(d)(1):
a. City of American Canyon v. City of Vallejo, et al. (Sacramento Superior Court Case No. 34-2022-00327471).
b. City of American Canyon v. Leon Dale Schmidt (Napa County Superior Court Cases No. 22CV001041 and 23PR00161).
c. Center for Biological Diversity v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV000511).
d. Golden State Environmental Jus!ce Alliance v. City of American Canyon et al. (Napa Superior Court Case No. 23CV000510).
e. City of Vallejo v. City of American Canyon et al . (Napa County Superior Court Case No. 23CV000517).
f. City of Vallejo v. City of American Canyon et al . (Napa County Superior Court Case No. 23CV001600).
2. Conference with Legal Counsel – An(cipated Li(ga(on. Authorized pursuant to Government Code Section 54956.9 (d)(2). Three (3) Matters. 6:30 P.M. OPEN SESSION - REGULAR MEETING
CALL TO ORDER - COUNCIL TO RECONVENE IN OPEN SESSION
CITY COUNCIL MEETING AGENDA FEBRUARY 6, 2024
2 PLEDGE OF ALLEGIANCE
ROLL CALL - OPEN SESSION
REPORT ON CLOSED SESSION/CONFIRMATION OF REPORTABLE ACTION
PROCLAMATIONS AND PRESENTATIONS
3. Proclamation - Black History
4. Proclamation honoring Gretchen Mayer
PUBLIC COMMENTS - ITEMS NOT ON CLOSED SESSION OR OPEN SESSION AGENDA This me is reserved for members of the public to address the City Council on items that are not on the Closed Session or Open Session agenda and are within the subject ma4er jurisdicon of the City Council. Comments are limited to 3 minutes. Comments for items on the Open Session agenda will be taken when the item is called in Open Session.The City Council is prohibited by law from taking any acon on ma4ers discussed that are not on the agenda, and no adverse conclusions should be drawn if the City Council does not respond to public comment at this time.
AGENDA CHANGES
The Mayor and Council may change the order of the Agenda or request discussion of a Consent Item. A member of the Public may request discussion of a Consent Item by making that request during Public Comment.
CONSENT CALENDAR
5. Minutes of January 16, 2024
Recommendation: Approve the minutes from the Regular City Council mee-ng of January 16, 2024.
6. Report Upon Return from Closed Session
Recommendation: Approve the Report Upon Return from Closed Session for the City Council meeting of January 16, 2023.
7. Amend Agreements with California Northern Railroad for Reconstruc(on of Crossings on Green Island Road (TR16-0700)
Recommendation: Adopt a Resolu-on authorizing the City Manager to execute Amendment #2 to Agreement 2019-A114 and Amendment #2 to Agreement 2019-A115, with the California Northern Railroad Company to rebuild two railroad crossings on Green Island Road (DOT No. 751326N and DOT No. 748368W), increasing the Construc-on Budget in the amount of $66,800, for a total contract amount not to exceed $1,709,299.80, in conjunc-on with the Green Island Road Reconstruction and Widening Project (TR16-0700).
8. Notice of Completion for the Recycled Water System Expansion Project (RW17-0100) Recommendation: Adopt a Resolu-on accep-ng the contracted work as complete, authorizing the Public Works Director to file a “No-ce of Comple-on”, and releasing a Reten-on payment to Argonaut Constructors in conjunc-on with the Recycled Water System Expansion Project (RW17-0100).
CITY COUNCIL MEETING AGENDA FEBRUARY 6, 2024
3 9. Notice of Completion for the 2022 Annual Pavement Management Project (TR22-0300) Recommendation: Adopt a Resolu-on accep-ng the contracted work as complete, authorizing the Public Works Director to file a No-ce of Comple-on, and releasing a Reten-on payment to Mar-n Brothers Construc-on in conjunc-on with the 2022 Annual Pavement Management Project (TR22-0300).
10. Resolution of Local Support for the NVTA Vision Zero Plan Recommendation: Adopt a resolu-on suppor-ng the Napa Valley Transporta-on Authority Vision Zero Plan.
11. Emergency Sewer Repair on Andrew Road
Recommendation: Take the following ac-ons related to the Andrew road Emergency Sewer Repair Project:
1. Adopt a resolu-on adding Capital Improvement Project Andrew Road Emergency Sewer Repair (WW24-0100);
2. Authorizing a project budget of $175,000 for WW24-0100;
3. Authorizing a budget transfer of $175,000 from Wastewater Enterprise Fund Reserves to WW24-0100;
4. Awarding a construc-on contract to GhiloP Construc-on Company for an amount of $125,000;
5. Authorizing the City Manager to execute the construction contract; and
6. Authorizing the Public Works Director to approve change orders up to the budgeted amount.
12. Partial Acceptance of Watson Ranch Lot 10 Phase 1 Improvements Recommendation: Adopt a Resolution of the City Council of the City of American Canyon for par-al acceptance of the public improvements associated with the Watson Ranch Lot 10 Phase 1 Improvements Project.
13. Cer(fica(on of Sufficiency of Measure "K" Ini(a(ve Pe((on - An Ini(a(ve Measure Establishing a Ministerial PermiLng Process for Development of Certain Warehouse Facilities by Amending the City of American Canyon Municipal Code Recommendation: Adopt a Resolu-on of the City Council of the City of American Canyon accep-ng the cer-fica-on of the Napa County Clerk Ex-Officio Registrar of Voters as to the sufficiency of the ini-a-ve pe--on en-tled "An Ini-a-ve Measure Establishing a Ministerial Permitting Process for Development of Certain Warehouse Facilities by Amending the City of American Canyon Municipal Code".
PUBLIC HEARINGS
14. Ordinances Establishing Industrial Use Sustainability Standards and Greenhouse Gas Emissions Standards.
Recommendation: Waive first reading, read by title only, and adopt the following:
1. An Ordinance of the City Council of the City of American Canyon, State of California, adopting an Ordinance to implement Industrial Use Greenhouse Gas Standards; and CITY COUNCIL MEETING AGENDA FEBRUARY 6, 2024
4 2. An Ordinance of the City Council of the City of American Canyon, State of California, adopting an Ordinance to implement Industrial Commerce Centers Sustainability Standards.
BUSINESS
15. Measure "K"
Recommendation: Adopt a Resolu-on of the City Council of the City of American Canyon directing City Staff to prepare a Report pursuant to Elections Code section 9212.
MANAGEMENT AND STAFF ORAL REPORTS
16. Public Works Department Quarterly Update
Recommendation: Information Only
MAYOR/COUNCIL COMMENTS AND COMMITTEE REPORTS
The Mayor and Council may comment on ma4ers of public concern and announce ma4ers of public interest; no collective council action will be taken.
a) Report out from the January 17th Napa Valley Transporta-on Authority Board Mee-ng (Garcia/Joseph).
b) Report out from the January 26th Napa Countywide Climate Ac-on Commi2ee Mee-ng (Garcia/Joseph).
c) Report out from the February 5th Napa County Local Agency Forma-on Commission Mee-ng (Aboudamous).
17. City Council Committee Report - Councilmember Mark Joseph
FUTURE AGENDA ITEMS
18. Future Agenda Items of Note:
February 20, 2024, Regular City Council Meeting. 6:30 p.m.
Recology Franchise Agreement
Mid-Year Budget Update
Eco-Center Long-Term Lease
March 5, 2024 Regular City Council Meeting. 6:30 p.m.
Proclamation National Women's History Month
Proclamation American Red Cross Month
Annual Police Report
Annual Communications Report
Measure K EC 9212 Report (tentative)*
CITY COUNCIL MEETING AGENDA FEBRUARY 6, 2024
5 March 19, 2024 Regular City Council Meeting. 6:30 p.m.
Proclamation Acknowledging Ramadan
National Community Survey
Housing Element: Annual Report and Zone Change
Westside Connector*
April 2, 2024 Regular City Council Meeting. 6:30 p.m.
Utility Rates Protest Hearing
Note: Council requested items are marked "*"
ADJOURNMENT
CERTIFICATION
I, Taresa Geilfuss, City Clerk for the City of American Canyon, do hereby declare that the foregoing agenda of the City Council was posted in compliance with the Brown Act prior to the meeting date. ______________________________________
Taresa Geilfuss, CMC, City Clerk
CITY COUNCIL MEETING AGENDA FEBRUARY 6, 2024
6 CITY OF AMERICAN CANYON
PROCLAMATION
RECOGNIZING FEBRUARY 2024 AS BLACK HISTORY MONTH
WHEREAS, in 1915 Dr. Carter Godwin Woodson, noted Black scholar and son of former slaves, founded the Association for the study of Negro Life and History, which was later renamed the Association for the Study of African American Life and History (ASALH); and WHEREAS, Dr. Woodson initiated Black History Week, February 12, 1926. For many years, the second week of February, chosen so as to coincide with the birthdays of Fredrick Douglas and Abraham Lincoln, was celebrated by African Americans in the United States; and WHEREAS, in 1976, as part of the Nation’s bicentennial, Black History Week was expanded and became established as Black History Month, and is now celebrated all over the world; and WHEREAS, we pay tribute to the heroes, sung and unsung, of African-American history, recalling the inner strength that sustained millions in bondage. We remember the courage that led activists to defy lynch mobs and register their neighbors to vote. We carry forward the unyielding hope that guided a movement as it bent the arc of the moral universe toward justice. Even while we seek to dull the scars of slavery and legalized discrimination, we hold fast to the values gained through centuries of trial and suffering.
WHEREAS, Every American can draw strength from the story of hard-won progress, which not only defines the African-American experience, but also lies at the heart of our Nation as a whole. This story affirms that freedom is a gift from God, but it must be secured by His people here on earth. It inspires a new generation of leaders, and it teaches us all that when we come together in common purpose, we can right the wrongs of history and make our world anew; and WHEREAS, Black History Month reminds us to continue to fight for justice and equality and should be a uniting call to our nation to continue to work for a more diverse, supportive, inclusive, and protective union; and
NOW, THEREFORE, BE IT RESOLVED, that I, Leon Garcia, Mayor of the City of American Canyon, on behalf of the American Canyon City Council, do hereby proclaim February 2024 as Black History Month and call upon public officials, educators, librarians, and encourage residents of the American Canyon community, to observe this month with appropriate programs, ceremonies, and activities.
Dated: February 6, 2024 ______________________________
Leon Garcia, Mayor
7 CITY OF AMERICAN CANYON
PROCLAMATION
HONORING GRETCHEN MAYER FOR 23 YEARS OF PUBLIC SERVICE
WHEREAS, in April 1993, Gretchen served as a Housing Technician for the Sacramento Housing and Redevelopment Agency where she determined participant eligibility in a project-based Public Housing Program, and oversaw the operations of some 400 rental units, and WHEREAS, in January 2000, Gretchen served as a Housing Specialist and Family Self-Sufficiency Coordinator for the City of Fairfield administering the federal Department of Housing and Urban Development Family Self-Sufficiency Program, and
WHEREAS, in 2005, Gretchen served as a Kindergarten Aide at Alta Sierra Elementary School in the Pleasant Ridge Union School District in Grass Valley, and WHEREAS, in 2012, Gretchen served as a Housing Specialist for the City of Suisun City focusing on client intake and support, conducting Housing Quality Standards inspections, and maintaining records and procedures according to the Suisun City Housing Authority Plan, and WHEREAS, in 2016, Gretchen became the Human Resources Technician in the City of Suisun where she was responsible for recruiting, new employee onboarding, and benefits administration, was appointed Deputy City Clerk in 2018, and earned a Worker Occupational Safety and Health Specialist certificate and became a California Certified Professional from CalGov HR, and WHEREAS, in December 2020, Gretchen was hired by the City of American Canyon as Human Resources Assistant during the COVID-19 pandemic, which required her creativity to convert employee processes from paper to electronic and from in person to virtual. Gretchen was instrumental in upgrading employee benefits administration processes and successfully established herself as the City’s go-to person for all things CalPERS, while also earning a Human Resources Management Certificate from Sonoma State University, and
WHEREAS, throughout her career Gretchen was known for her compassion, empathy and professionalism in assisting housing clients and fellow employees.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of American Canyon hereby thanks and congratulates Gretchen Mayer upon herretirement for her loyal and generous public service for more than 23 years.
Dated: February 6, 2024 __________________________________________ Leon Garcia, Mayor
8 CITY OF AMERICAN CANYON
REGULAR CITY COUNCIL MEETING
ACTION MINUTES
January 16, 2024
5:00 P.M. – CLOSED SESSION
CALL TO ORDER - CLOSED SESSION
The City Council meeting was called to order at 5:03 p.m.
ROLL CALL - CLOSED SESSION
Present: Councilmember Mariam Aboudamous, Councilmember Mark Joseph, Councilmember Pierre Washington, Vice Mayor David Oro, Mayor Leon Garcia
Absent: None
Excused: None
PUBLIC COMMENTS - CLOSED SESSION ITEMS
Mayor Garcia called for public comments on closed session items. Written comments: none. Oral comments: none. The public comment period was closed.
MEETING RECESS - COUNCIL TO CONVENE IN CLOSED SESSION
5:00 P.M. CLOSED SESSION ITEMS
Conference with Legal Counsel - Existing Litigation. Authorized pursuant to Government Code Section 54956.9(d)(1):
a. City of American Canyon v. City of Vallejo, et al. (Sacramento Superior Court Case No. 34-2022-00327471).
b. City of American Canyon v. Leon Dale Schmidt (Napa County Superior Court Cases No. 22CV001041 and 23PR00161).
c. Center for Biological Diversity v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV000511).
d. Golden State Environmental Justice Alliance v. City of American Canyon et al. (Napa Superior Court Case No. 23CV000510).
e. City of Vallejo v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV000517).
f. City of Vallejo v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV001600).
9 2. Conference with Legal Counsel – Anticipated Litigation. Authorized pursuant to Government Code Section 54956.9 (d)(2). Two (2) Matters.
6:30 P.M. OPEN SESSION - REGULAR MEETING
CALL TO ORDER - COUNCIL TO RECONVENE IN OPEN SESSION
The City Council meeting was called to order at 6:38 p.m.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited.
ROLL CALL - OPEN SESSION
Present: Councilmember Mariam Aboudamous, Councilmember Mark Joseph, Councilmember Pierre Washington, Vice Mayor David Oro, Mayor Leon Garcia
Absent: None
Excused: None
REPORT ON CLOSED SESSION/CONFIRMATION OF REPORTABLE ACTION A report on Closed Session and confirmation of reportable action was given by City Attorney William Ross.
PROCLAMATIONS AND PRESENTATIONS
There were no Proclamations and Presentations items.
PUBLIC COMMENTS - ITEMS NOT ON CLOSED SESSION OR OPEN SESSION AGENDA Mayor Garcia called for public comments. Written comments: none. Oral comments: Justin Hamilton Hole was called to speak. The public comments period was closed.
AGENDA CHANGES
Action: Motion to amend the agenda to add Consent Item 8 Watson Ranch Master Backbone Infrastructure made by Councilmember Mariam Aboudamous, seconded by Vice Mayor David Oro, and CARRIED by roll call vote.
Ayes: Councilmember Mariam Aboudamous, Councilmember Mark Joseph, Councilmember Pierre Washington, Vice Mayor David Oro, Mayor Leon Garcia Nays: None
Abstain: None
Absent: None
Excused: None
10 CONSENT CALENDAR
Vice Mayor David Oro requested to pull item 5 from the consent calendar for discussion.
Action: Motion to adopt CONSENT CALENDAR, except for Item 5 Cooperative Agreement for the American Canyon State Route 29 Corridor Improvement made by Vice Mayor David Oro,seconded by Councilmember Pierre Washington, and CARRIED by roll call vote.
Ayes: Councilmember Mariam Aboudamous, Councilmember Mark Joseph, Councilmember Pierre Washington, Vice Mayor David Oro, Mayor Leon Garcia Nays: None
Abstain: None
Absent: None
Excused: None
3. Minutes of December 19, 2023
Action: Approve the minutes of the Regular City Council meeting of December 19, 2023.
4. Measure T MOE and Equivalent Fund Certification
Action: Take the following actions related to Measure “T” (The Napa Countywide Road Maintenance Act):
Adopt Resolution 2024-01 approving the Maintenance of Effort (MOE) certification of $370,015 as required under Measure “T” Program (The Napa Countywide Road Maintenance Act) and adopt Resolution 2024-02 approving certification of Equivalent Fund expenditures under the Measure "T" Program (The Napa Countywide Road Maintenance Act).
6. Report Upon Return from Closed Session
Action: Approve the Report Upon Return from Closed Session for the City Council meeting of December 19, 2023.
7. Regional Climate Action and Adaptation Plan
Action: Adopt Minute Order 2024-01 increasing FY 23/24 General Fund appropriations by $8,641 to cover American Canyon's share of the cost for Napa Countywide Climate Action Committee to prepare a Regional Climate Action and Adaptation Plan (RCAAP) with the source of funding being the General Fund Undesignated Fund Balance.
8. Watson Ranch Master Backbone Infrastructure (MBI) Phase 1 Improvements Project Action: Adopt Resolution 2024-04 of the City Council of the City of American Canyon for partial acceptance of the public improvements associated with the Watson Ranch Master Backbone Infrastructure (MBI) Phase 1 Improvements Project.
Vice Mayor Oro requested the removal of Item 5 from the Consent Calendar.
5. Cooperative Agreement for the American Canyon State Route 29 Corridor Improvement Project
11 Council received an update of item 5 from City Manager Jason Holley. Mayor Garcia called for public comments. Written comments: none. Oral comments: Beth Marcus was called to speak; Hugh Marquez was called to speak; Mark Mehelis was called to speak; Justin Hamilton Hole was called to speak. The public comments period was closed.
Action: Motion to adopt Resolution 2024-03 authorizing the City Manager to execute Cooperative Agreement 04-2957 (Agreement 2024-04) with Caltrans and Napa Valley Transportation Authority for Project Approval and Environmental Document phase services associated with the American Canyon State Route 29 Corridor Improvement Project. made by Vice Mayor David Oro, seconded by Councilmember Mark Joseph, and CARRIED by roll call vote.
Ayes: Councilmember Mariam Aboudamous, Councilmember Mark Joseph, Councilmember Pierre Washington, Vice Mayor David Oro, Mayor Leon Garcia Nays: None
Abstain: None
Absent: None
Excused: None
PUBLIC HEARINGS
There were no Public Hearing items.
BUSINESS
9. Utility Rate Changes
Council received a staff report and presentation from City Manager Jason Holley with Alan Highstreet of NBS and Communications Manager Jen Kansanback. Mayor Garcia called for public comments. Written comments: none. Oral comments: William Baker was called to speak; Hugh Marquez was called to speak; Jim Potter was called to speak. The public comments period was closed.
Action: Motion to adopt Resolution 2024-04 of Intention to adopt new utility rates, setting a public hearing date for April 2, 2024, and directing the issuance of Notices of a Proposition 218 Public Hearing to all utility customers and property owners within the City of American Canyon’s service area. made by Councilmember Pierre Washington, seconded by Vice Mayor David Oro, and CARRIED by roll call vote.
Ayes: Councilmember Mariam Aboudamous, Councilmember Mark Joseph, Councilmember Pierre Washington, Vice Mayor David Oro, Mayor Leon Garcia Nays: None
Abstain: None
Absent: None
Excused: None
12 10. Annual Comprehensive Financial Report and Year-end Financial Results Council received a staff report and presentation from Finance Director Juan Gomez. Mayor Garcia called for public comments. Written comments: none. Oral comments: none. The public comments period was closed.
MANAGEMENT AND STAFF ORAL REPORTS
11. Parks and Community Services Commission Mid-Year Update Council received a Parks and Community Services Commission update from Parks & Recreation Director Alexandra Ikeda. Mayor Garcia called for public comments. Written comments: none.
Oral comments: Fran Lemos was called to speak; Karen Fritz was called to speak. The public comments period was closed.
12. Maintenance and Utilities Department, Sewer/Wastewater Division Update Council received a Maintenance and Utilities Department, Sewer/Wastewater Division Update from Jay Atkins (title). Mayor Garcia called for public comments. Written comments: none. Oral comments: Fran Lemos was called to speak. The public comments period was closed.
13. Measure K Update
Council received a Measure K Update from City Attorney William Ross. Mayor Garcia called for public comments. Written comments: none. Oral comments: none. The public comments period was closed.
MAYOR/COUNCIL COMMENTS AND COMMITTEE REPORTS
14. City Council Committee Report - Councilmember Mark Joseph The mayor and council members provided oral reports and announced items of community interest.
FUTURE AGENDA ITEMS
15. Future Agenda Items of Note:
February 2, 2024, Special City Council Meeting. 9:00 a.m.
Update Sustainability Goal (Financial and Environmental) Financial Forecast (FY 24/25 Budget and beyond)
Citywide Staffing, Technology and Service Delivery
February 6, 2024, Regular City Council Meeting. 6:30 p.m.
Proclamation Black History Month
Napa Valley Transportation Authority Presentation on Measure X Air Quality Standards of Review
13 February 20, 2024, Regular City Council Meeting. 6:30 p.m.
Mid-Year Budget Update
Eco-Center Long-Term Lease
State of the City Road Show:
February 21: Online presentation (evening)
February 22: Active Adult Center (morning)
March 1: ACHS Presentation (daytime)
March 12: Chamber of Commerce (lunchtime)
March 5, 2024, Regular City Council Meeting. 6:30 p.m.
Proclamation National Women's History Month
Proclamation American Red Cross Month
Annual Police Report
Annual Communications Report
March 19, 2024, Regular City Council Meeting. 6:30 p.m.
Proclamation Acknowledging Ramadan
Housing Element: Annual Report and Zone Changes
Circulation Element Review*
Note: Council requested items are marked "*"
Mayor Garcia announced his retirement at the end of his term in December 2024.
ADJOURNMENT
The meeting was adjourned at 9:48 p.m.
CERTIFICATION
Respectfully Submitted,
_____________________________________
Taresa Geilfuss, City Clerk
14 15
William D. Ross
David P. Schwarz
Kypros G. Hostetter
Christina M. Bellardo
Law Offices of
William D. Ross
400 Lambert Avenue
Palo Alto, California 94306
Telephone: (650) 843-8080
www.lawross.com
Los Angeles Office:
11420 Santa Monica Blvd
#25532
Los Angeles, CA 90025
File No: 199/6
January 19, 2024
VIA E-MAIL
The Honorable Leon Garcia, Mayor
and Members of the City Council
City of American Canyon
4381 Broadway, Suite 201
American Canyon, CA 94503
Re: Report Upon Return from Closed Session; Regular City Council Closed Session Meeting of the American Canyon City Council of January 16, 2024 Dear Mayor Garcia and Members of the City Council:
This communication sets forth reportable action, if any, of the City Council (“Council”) of the City of American Canyon (“City”), consistent with provisions of the Ralph M. Brown Opening Meeting Act (Government Code Section 54950, et seq.) resulting from the Closed Session of the Regular City Council Closed Session Meeting of January 16, 2024, consistent with Government Code Section 54957.1.
Mayor Leon Garcia called the meeting to order in Open Session at 5:03 p.m. and after ascertaining that there were no public comments on Closed Session matters, the Council then adjourned to Closed Session at 5:04 p.m.
There were two matters agendized for City Closed Session consideration:
1. Conference with Legal Counsel – Existing Litigation
Authorized Pursuant to Government Code Section 54956.9(d)(1):
a. City of American Canyon v. City of Vallejo, et al.
(Sacramento Superior Court Case No. 34-2022-00327471);
b. City of American Canyon v. Leon Dale Schmidt, (Napa
County Superior Court Case No. 22CV001041 and
23PR00161);
c. Center for Biological Diversity v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV000511); 16 The Honorable Leon Garcia, Mayor
and Members of the City Council
January 19, 2024
d. Golden State Environmental Justice Alliance v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV000510);
e. City of Vallejo v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV000517); and,
f. City of Vallejo v. City of American Canyon et al. (Napa County Superior Court Case No. 23CV001600).
2. Conference with Legal Counsel – Anticipated Litigation Authorized Pursuant to Government Code Section No. 54956.9(d)(2) Two Matters.
With respect to Closed Session Agenda Item No. 1.a. through 1.e, there was no reportable action by your Council under the common law attorney-client privilege and that provided by Government Code Section 54956.9(d)(1).
With respect to Closed Session Agenda Item No. 1.f., although there was direction given to the City Attorney and City Staff, there was no reportable action under the common law attorneyclient privilege and that provided by Government Code Section 54956.9(d)(1).
With respect to Closed Session Agenda Item No. 2., there was no reportable action under the common law attorney-client privilege and that provided by Government Code Section 54956.9(d)(2) with respect to either of the two matters considered.
Your Council concluded the Closed Session at 6:16 p.m.
In Open Session, it was indicated that a written report upon return from Closed Session consistent with Government Code Section 54957.1, would be prepared concerning the matters agendized for Closed Session.
This communication should be reviewed under the Consent portion of the Agenda of your next Regular or Special City Council Meeting.
Should you have questions concerning this Report, it may be taken off the Consent calendar when agendized in the future, or our office may be contacted in the interim.
Very truly yours,
William D. Ross
City Attorney
17 The Honorable Leon Garcia, Mayor
and Members of the City Council
January 19, 2024
WDR:jf
cc: Jason B. Holley, City Manager
Maria Ojeda, Assistant City Manager
Taresa Geilfuss, City Clerk
Cherri Walton, Deputy City Clerk
18 CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
CONSENT
ITEM NUMBER: 7.
TITLE
Amend Agreements with California Northern Railroad for Reconstruc)on of Crossings on Green Island Road (TR16-0700)
RECOMMENDATION
Adopt a Resolu)on authorizing the City Manager to execute Amendment #2 to Agreement 2019- A114 and Amendment #2 to Agreement 2019-A115, with the California Northern Railroad Company to rebuild two railroad crossings on Green Island Road (DOT No. 751326N and DOT No. 748368W), increasing the Construc)on Budget in the amount of $66,800, for a total contract amount not to exceed $1,709,299.80, in conjunc)on with the Green Island Road Reconstruc)on and Widening Project (TR16-0700).
CONTACT
Erica Ahmann Smithies, P.E., Public Works Director
Ron Ranada, P.E., Senior Civil Engineer
BACKGROUND & ANALYSIS
Overall design of the Green Island Road Reconstruc)on and Widening Project (TR16-0700) is nearing comple)on, with project adver)sement scheduled for this Spring, and construc)on later this year.
As part of the road project, the sec)on of Green Island Road from Commerce Boulevard to Paoli Loop will be widened to improve exis)ng and provide new transporta)on facili)es, including three traffic lanes (two travel lanes and one center turn lane), and a dedicated Class I trail.
To accommodate the road widening, the Green Island Road Rule 20 A/B U)lity Underground Project was started a year ago, and is nearing comple)on with the majority of the remaining work falling to the utility companies to relocate their existing overhead facilities underground.
The separate effort to accommodate the road widening via reconstruc)on of the two exis)ng atgrade railroad crossings on Green Island Road was also started in the Spring of 2020, when track and surface crossing improvements were installed. Addi)onally, conduits were installed by the railroad in December 2021 to support the u)lity undergrounding project and crossing safety improvements.
The railroad improvements are being accomplished via turn-key construc)on agreements with Union Pacific Railroad (UPRR) and California Northern Railroad (CFNR) (Agreement 2019-A114 for railroad crossing DOT No. 751326N and Agreement 2019-A115 for railroad crossing DOT No. 19 748368W). Combined, the ini)al contract value of the Agreements for the design and installa)on of needed improvements was $1,516,521.96. Per subsequent amendments to each agreement that were executed to account for actual bid prices which came in higher than es)mated, the combined value was increased by $122,777.84 to a new total of $1,639,299.80. Included in the total was approximately $58,000 in construc)on con)ngency. Subsequently, during the course of the two separate railroad efforts above, unforeseen condi)ons were encountered which essen)ally depleted the contingency funds.
Presently, as part of the railroad crossing improvements, and in conjunc)on with the u)lity undergrounding project, the electrical services to the railroad crossing controls need to be upgraded/converted. CFNR has informed staff that this work was not originally scoped in their work to deliver. Hence, CFNR has submiEed an amendment proposal reques)ng addi)onal construc)on funding in the amount of $66,800 (see Attachment #2).
Comple)on of the railroad component of the Project is necessary to support the u)lity reloca)on and underground work, as well as the road widening and reconstruc)on work, and the Class I trail improvements. Hence, staff recommends City Council authorize the City Manager to execute the proposed amendments with California Northern Railroad, in conjunction with the Project.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Infrastructure: "Develop and maintain infrastructure resources to support sustainable growth."
FISCAL IMPACT
Although the scope of work noted above was unforeseen, the FY 23/24 Capital Budget and Project Budget have sufficient alloca)on to cover the addi)onal cost of $66,800 for a total contract amount not to exceed $1,709,299.80 via the Project's Community Facili)es District (CFD) funds. The CFD fund source has been the sole source of funding for the railroad construction effort.
While the Project Budget also has federal funds from the Department of Commerce - Economic Development Administra)on, the use of such funds, as s)pulated by the grant agreement, can only be used for facili)es which will become City-property. Hence, the railroad's electrical services do not qualify.
ENVIRONMENTAL REVIEW
The railroad reconstruc)on work to be undertaken by CFNR is categorically exempt from CEQA under Ar)cle 19, Sec)on 15301, rela)ng to opera)ons, repair, maintenance and permiKng of existing public or private facilities.
ATTACHMENTS:
20 1. Resolution: GIR RxR Amendment
2. CFNR Amendment Proposal
21 RESOLUTION NO. 2024-______
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT #2 TO AGREEMENT 2019-A114 AND AMENDMENT #2 TO AGREEMENT 2019-A115, BOTH WITH CALIFORNIA NORTHERN RAILROAD COMPANY TO REBUILD TWO RAILROAD CROSSINGS ON GREEN ISLAND ROAD (DOT NO. 751326N AND DOT NO. 748368W), INCREASING THE CONSTRUCTION BUDGET IN THE AMOUNT OF $66,800, FOR A TOTAL CONTRACT AMOUNT NOT TO EXCEED $1,709,299.80, IN CONJUNCTION WITH THE GREEN ISLAND ROAD RECONSTRUCTION AND WIDENING PROJECT (TR16-0700).
WHEREAS, proposed roadway improvements on Green Island Road in conjunction with the “Green Island Road Reconstruction and Widening Project (TR16-0700)” (“Project”) affect two at-grade railroad crossings (DOT No. 748368W to the east, and DOT No. 751326N to the west); and WHEREAS, the underlying fee owner of the railroad crossings is Union Pacific Railroad (“UPRR”), and the track lessee is California Norther Railroad (“CFNR”) (which is a subsidiary of Genesee & Wyoming Railroad); and
WHEREAS, the CFNR is solely responsible for the design and construction of its own track and signal facilities within its rights-of-way; and
WHEREAS, in September 2017, the City executed Agreement No. 2017-A153 with CFNR to design and provide for “turn key” improvements at both railroad crossings that are necessary to support the City’s proposed improvements; and
WHEREAS, in July 2019, the City executed Agreement Nos. 2019-A114 and 2019-A115 with CFNR and UPRR to construct crossing improvements at the railroad crossings that are necessary to support the City’s proposed improvements; and
WHEREAS, additional funding in the amount of $66,800 is needed in order to complete electrical work associated with the signal crossing system, which was not originally scoped; and WHEREAS, said cost can be funded by Community Facilities District No. 2018-1 (Green Island Road Project); and
WHEREAS, the FY23-24 Budget contains the necessary funding to execute the amendments. 22 2
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of American Canyon hereby authorizes the City Manager to execute Amendment #2 to Agreement 2019-A114 and Amendment #2 to Agreement 2019-A115 with California Northern Railroad Company, in a combined sum not to exceed $66,800, for a total contract amount not to exceed $1,709,299.80.
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February, 2024, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Leon Garcia, Mayor
ATTEST:
_______________________________
Taresa Geilfuss, CMC, City Clerk
23 RX1 FAE RX2 FAE FAE TOTALS
CROSSING WARNING SYSTEM $243,938.00 $253,907.00 $497,845.00 Railway Signal Construction $483,437.00 (Includes all design, requisition, labor, materials,
shop wiring, and installation)
CROSSING SURFACE/RESURFACE $195,901.00 $235,803.00 $431,704.00 RailWorks $746,104.00 (Includes all design, requisition, labor, materials,
and installation)
RailWorks $46,035.00
TRACK GRADE AND REHABILITATION $100,000.00 $200,000.00 $300,000.00 (Includes all design, requisition, labor, materials,
and installation)
PRELIMINARY ENGINEERING (Phase 1) $14,646.50 $14,646.50 $29,293.00 $3,000.00 (Includes CONTRACT Labor for all Engineering,
Agency Coordination, and Project Management)
AGREEMENTS & APPROVALS (Phase 2) $7,325.50 $7,325.50 $14,651.00 (Includes CONTRACT Labor for all Engineering,
Agency Coordination, and Project Management)
CONSTRUCTION ENGINEERING (Phase 3) $13,427.50 $13,350.50 $26,778.00 (Includes CONTRACT Labor for all Engineering,
Agency Coordination, and Project Management)
CROSSING CONTROL CIRCUIT DESIGN (Phase
1) $11,114.40 $11,114.40 $22,228.80
CIVIL / STRUCTURAL ENGINEERING (Phase 1) $17,630.00 $17,630.00 $35,260.00 (Includes Costs For Services Provided by TY Lin)
CONSTRUCTION ENGINEERING INSPECTION $6,000.00 $6,000.00 $12,000.00 (Estimated Construction Engineering Inspection
cost based on RR Code: days @ $(CFNR) per day)
UTILITY CROSSING $0.00 $0.00 $0.00
(RR Code: new utiltiy crossings @ $(CFNR) per
crossing, includes application, engineering review,
and right of entry)
RIGHT OF ENTRY FEE $0.00 $0.00 $0.00
(Right of Entry Fee of $1,500 is valid for 60 days,
after 60 days, additional fees of $750 per 30 days
are required.)
FLAGGING SERVICES $0.00 $0.00 $0.00 NRSS (FOR POTHOLING) $2,000.00 (Estimated Flagging Services cost based on days
@ $ per day)
NRSS (FOR UTILITY BURIAL) $6,300.00
AC POWER SERVICE $5,000.00 $5,000.00 $10,000.00
(Includes all Power Service Charges not included in
other costs)
Performance Electric
(POTHOLING)
$8,986.71
OTHER-RX1 - Utility bore $99,770 $99,770.00 $101,520.00 $201,290.00 Performance Electric (FOR
UTILITY BURIAL)
$101,520.00
OTHER-RX2 - Utility bore $101,520
Performance Electric (FOR
UTILITY BURIAL)
$99,770.00
OTHER - CONSTRUCTION CONTINGENCY
$58,250 $30,000.00 $28,250.00 $58,250.00
Allocated to Flagging, surface/Track work
TOTALS $744,752.90 $894,546.90 $1,639,299.80 TOTAL POs ISSUED $1,634,361.71 REMAINING NON‐PO'D FUNDS $4,938.09
ADDITIONAL FUNDING REQUEST
AC POWER SERVICE (PERFORMANCE ELECTRIC) $19,787.17 $18,942.44 $38,729.61 FLAGGING SERVICES (10 DAYS @ 1,500/DAY)
(NRSS) $7,500.00 $7,500.00 $15,000.00
CONSTRUCTION ENGINEERING / INSPECTION $9,000.00 $9,000.00 $18,000.00 ADDITIONAL FUNDING SUBTOTAL $36,287.17 $35,442.44 $71,729.61 ADDITIONAL FUNDING ‐ REMAINING NON‐PO'D FUNDS $66,791.52 Actual POs
Xorail (INC. SUBS ‐ CIVIL
ENG., SIGNAL ENGINEERING,
ETC.)
$38,777.00
Xorail (INC. SUBS ‐ CIVIL
ENG., SIGNAL ENGINEERING,
ETC.)
Xorail (INC. SUBS ‐ CIVIL $98,432.00
ENG., SIGNAL ENGINEERING,
ETC.)
24 CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
CONSENT
ITEM NUMBER: 8.
TITLE
Notice of Completion for the Recycled Water System Expansion Project (RW17-0100)
RECOMMENDATION
Adopt a Resolu1on accep1ng the contracted work as complete, authorizing the Public Works Director to file a “No1ce of Comple1on”, and releasing a Reten1on payment to Argonaut Constructors in conjunction with the Recycled Water System Expansion Project (RW17-0100).
CONTACT
Erica Ahmann Smithies, P.E., Public Works Director/City Engineer Ron Ranada, P.E., Senior Civil Engineer
BACKGROUND & ANALYSIS
The Recycled Water System Expansion Project consists of the construc1on of approximately 11,600 LF total of new recycled water mains (350 LF of 2” main; 3,900 LF of 6” main; 2,443 LF of 8" main; and 5,250 LF of 12” main) and includes the conversion of exis1ng services from the domes1c water system to the new recycled water system. Loca1ons of work within the City include Benton Way and Community Park 2, Spikerush Circle and Community Park 1, and Lombard Road and Hess Drive.
Loca1ons of work within the City’s water distribu1on area in unincorporated Napa County include Devlin Road (South Kelly Road to Tower Road), and Tower Road.
On June 20, 2023, aGer City staff was able to sa1sfactorily conclude nego1a1ons with Argonaut Constructors for a revised bid in the amount of $2,175,159.60, the City Council authorized the award of the construc1on contract to the lowest responsible and responsive bidder in an amount not to exceed the Project Budget, and authorized the Public Works Director to approve and execute contract change orders in an aggregate amount not to exceed the Project Budget (R2023-54).
Improvements within the City commenced on Benton Way in mid-July and was completed on schedule prior to the beginning of the school year in mid-August 2023. The Project completed five service conversions at the following proper1es within the City: American Canyon Middle School, Aqua1cs Center, Boys & Girls Club, Community Park I & Community Park II. The conversions will save an es1mated 42 acre-feet per year of potable water. Due to cost effec1veness considera1ons, the scope of work to undertake the 8" main and service conversions in Lombard Road and Hess Drive was removed from the Project and assigned to the Oat Hill development project. 25 Main line improvements in unincorporated Napa County commenced in September 2023 and were completed in November 2023. There are fourteen (14) industrial customers including the Napa Recycling and Compost facility within the County, that s1ll need onsite conversions to be completed under a separate process. The onsite conversions are an1cipated to provide an annual offset of 37 acre-feet of potable water once completed.
Argonaut Constructors has completed the contract work, including Contract Change Order (CCO) Nos. 1-4, to the sa1sfac1on of the Public Works Director, at a final contract cost of $2,593,669.03.
Staff recommends the Council accept the work as complete, approve a No1ce of Comple1on, and authorize the release of Retention payment to Argonaut Constructors.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Infrastructure: "Develop and maintain infrastructure resources to support sustainable growth."
FISCAL IMPACT
The total construction contract for Argonaut Constructors including CCO Nos. 1-4 is $2,593,669.03.
Contract Item Amount
Original Construction
Contract
$2,175,159.60
Contract Change Order #1 $399,850.01
Contract Change Order #2 $46,344.52
Contract Change Order #3 $35,061.69
Contract Change Order #4 ($62,746.79)
Total Construction
Contract
$2,593,669.03
Contract Change Order #1, which accounts for over 95% of the total change order costs, was due to the pavement restora1on of Devlin Road in Napa County. At the 1me of award, the Napa County encroachment permit had not yet been finalized, and the pavement restora1on condi1ons were s1ll unknown. However, City staff had already an1cipated costs for a more extensive restora1on requirement due to Devlin Road being a moratorium street.
In addi1on, there was also an1cipated force account work to complete the por1on of the Project that was not completed by the previous contractor, California Trenchless Inc., which includes tes1ng and 1e-in of the new mains to the exis1ng system, and various restora1on work in the Community Parks. City staff was able to keep all change order work within the Project Budget, with its contingency funds.
The es1mated total Project expenditures including the construc1on contract, materials tes1ng, 26 engineering and inspection services, and miscellaneous expenses is $3,700,619.
Item Description Amount
Construction Contract (California
Trenchless Inc.)
$881,330.85
Construction Contract (Argonaut
Constructors)
$2,593,669.03
Materials Testing Services $36,386.80
In-house Staff and Project
Support
$142,675.09
Miscellaneous (Postage &
Advertisement)
$2,380.42
Legal Expenses $47,976.31
Total Estimated Project
Expenditure (rounded)
$3,700,619
Given the expenditures, staff an1cipates being able to pursue the full amounts of the Project's grant funds, notably Napa County's ARPA grant for $1,500,000, and the North Bay Water Reuse Authority's (NBWRA) grant for $407,448. Request for reimbursement of the ARPA funds are targeted for submission next month. Receipt of NBWRA grant funds are an1cipated for a rela1vely much later date due to the City's work scope being part of a larger package with mul1ple agencies/projects needing to be delivered by others.
ENVIRONMENTAL REVIEW
An Environmental Impact Report/Statement was prepared for this project (SCH# 2017072051) pursuant to the provisions of CEQA. Mi1ga1on measures were made a condi1on of the approval of the project. A mi1ga1on monitoring and repor1ng program, and statement of overriding considera1ons was adopted for this project (Resolu1on 2018-137). A No1ce of Determina1on was filed for the project on December 19, 2018.
ATTACHMENTS:
1. Resolution - NOC RW17-0100 Recycled Water System Expansion Project
2. Notice of Completion.pdf
27 RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON
ACCEPTING THE PROJECT AS COMPLETE, AUTHORIZING THE PUBLIC WORKS
DIRECTOR TO FILE A NOTICE OF COMPLETION, AND RELEASING RETENTION
PAYMENT TO ARGONAUT CONSTRUCTORS IN CONJUNCTION WITH THE RECYCLED WATER SYSTEM EXPANSION PROJECT (RW17-0100)
WHEREAS, on June 20, 2023, the City Council authorized the award of the construction contract for the Recycled Water System Expansion Project (RW17-0100) to the lowest responsible and responsive bidder in an amount not to exceed the Project budget, and authorized the Public Works Director to approve and execute contract change orders in an aggregate amount not to exceed the Project budget of $3,848,888 (R2023-54); and
WHEREAS, subsequently, Argonaut Constructors was identified as the lowest responsible and responsive bidder, having submitted a bid in the amount of $2,175,159.60; and WHEREAS, the City Manager awarded the construction contract to Argonaut Constructors (Agreement 2023-82) in the amount of $2,175,159.60; and
WHEREAS, the Project completed the construction of approximately 9,500 LF total of new recycled water mains (350 LF of 2” main; 3,900 LF of 6” main; and 5,250 LF of 12” main) on Benton Way and Community Park 2, Spikerush Circle and Community Park 1 in American Canyon, and Devlin Road (South Kelly Road to Tower Road) and Tower Road in unincorporated Napa County; and WHEREAS, the Project completed five service conversions at the following properties within the City:
American Canyon Middle School, Aquatics Center, Boys & Girls Club, Community Park I & Community Park II; and
WHEREAS, Argonaut Constructors has completed the contract work, including Contract Change Order (CCO) Nos. 1-4, to the satisfaction of the Public Works Director, at a final contract cost of $2,593,669.03; and
WHEREAS, total project expenditures, including the construction contracts, material testing, engineering and inspection services, legal expenses, and miscellaneous expenses, is estimated at $3,700,619, and is within the Project Budget; and
WHEREAS, Argonaut Constructors has completed all contracted work to the satisfaction of the Public Works Director.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of American Canyon hereby accepts the Recycled Water System Expansion Project as complete, authorizes the Public Works Director to file a Notice of Completion, and approves the release of a Retention payment to Argonaut Constructors.
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February, 2024, by the following vote:
28 2
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Leon Garcia, Mayor
ATTEST: APPROVE AS TO FORM:
____________________________ _____________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 29 RECORDING REQUESTED BY:
City of American Canyon
4381 Broadway, Ste. 201
American Canyon, CA 94503
WHEN RECORDED RETURN TO:
City of American Canyon
4381 Broadway, Ste. 201
American Canyon, CA 94503
Exempt from recording fee pursuant to Government Code Section 27383
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the interest or estate stated in Paragraph 3 herein in the real property herein described is owned by:
City of American Canyon
4381 Broadway, Ste. 201
American Canyon, CA 94503
2. That the full name and address of the owner of said interest or estate, if there is only one owner, and that the full names and addresses of all the co-owners who own said interest or estate as tenants in common, as joint tenants, or otherwise, if there is more than one owner, are set forth in the preceding paragraph.
3. That the nature of the original contract, if any, for said work of improvement was: the Recycled Water System Expansion Project (RW17-0100) which consists of the construction of approximately 9,500 LF total of new recycled water mains (350 LF of 2” main; 3,900 LF of 6” main; and 5,250 LF of 12” main) and includes the conversion of existing services from the domestic water system to the new recycled water system. Locations of work within the City include Benton Way and Community Park 2, Spikerush Circle and Community Park 1, and Lombard Road and Hess Drive. Locations of work within the City’s water distribution area in unincorporated Napa County include Devlin Road (South Kelly Road to Tower Road), and Tower Road.
4. That on the 6th day of February, 2024 a work of improvement on the real property herein described was completed.
5. That the name of the original contractor for said work of improvement was:
Argonaut Constructors
360 Sutton Place
Santa Rosa, CA 95407
6. That the name and address of the transferor is:
Argonaut Constructors
360 Sutton Place
Santa Rosa, CA 95407
7. That the real property referred to herein is situated in the County of Napa, State of California, at Benton Way and Spikerush Circle within the City of American Canyon, Devlin Road and Tower Road within unincorporated Napa County, California. 30 Notice of Completion
By: CITY OF AMERICAN CANYON
_________________________________
Erica Ahmann Smithies, P.E.
Public Works Director
31 CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
CONSENT
ITEM NUMBER: 9.
TITLE
Notice of Completion for the 2022 Annual Pavement Management Project (TR22-0300)
RECOMMENDATION
Adopt a Resolu0on accep0ng the contracted work as complete, authorizing the Public Works Director to file a No0ce of Comple0on, and releasing a Reten0on payment to Mar0n Brothers Construction in conjunction with the 2022 Annual Pavement Management Project (TR22-0300).
CONTACT
Erica Ahmann Smithies, P.E., Public Works Director/City Engineer Ron Ranada, P.E., Senior Civil Engineer
BACKGROUND & ANALYSIS
The 2022 Annual Pavement Management Project (TR22-0300) consists of pavement rehabilita0on by means of asphalt rubber cape seal and asphalt grind and overlay at various loca0ons throughout the City, including digouts, curb ramp upgrades, new bicycle lane improvements, signage and striping on Donaldson Way, Gisela Drive, Elke Drive, Rebecca Court, Rita Court, Jana Way, and West Carolyn Drive in American Canyon.
The City solicited competitive bids for the Project and opened bids on July 25, 2023. Martin Brothers Construc0on was determined to be the lowest responsible and responsive bidder, with a bid of $1,813,354.18. On August 1, 2023, the City Council authorized the award of the construc0on contract and authorized the Public Works Director to approve and execute contract change orders in an aggregate amount not to exceed the Project Budget of $2,499,589 (R2023-59).
Mar0n Brothers Construc0on has completed the contract work, including Contract Change Order (CCO) Nos. 1 through 3, to the sa0sfac0on of the Public Works Director, at a final contract cost of $1,879,900.73. Staff recommends the Council accept the work as complete, approve a No0ce of Completion, and authorize the release of Retention payment to Martin Brothers Construction.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Infrastructure: "Develop and maintain infrastructure resources to support sustainable growth." 32 FISCAL IMPACT
The total construction contract amount including CCO Nos. 1-3 is $1,879,900.73.
Contract Item Amount
Original Construction
Contract
$1,813,354.18
Change Order #1 ($131,916.03)
Change Order #2 $187,166.18
Change Order #3 $11,296.40
Total Construction
Contract
$1,879,900.73
The change orders were mainly due to unforeseen exis0ng field condi0ons including unstable subgrade in the digout areas and no baserock found in several of the concrete curb ramps areas that were reconstructed.
The es0mated total Project expenditures including the construc0on contract, materials tes0ng, engineering and inspection services, and miscellaneous expenses is $1,988,285.
Description Amount
Construction Contract (Martin
Brothers Construction)
$1,879,900.73
Materials Testing Services $16,232.00
In-house Staff and Project Support $91,629.87
Miscellaneous (Postage and
Advertisement)
$521.97
Total Estimated Project
Expenditure (rounded)
$1,988,285
ENVIRONMENTAL REVIEW
15301 - The Project is exempt from review under the California Environmental Quality Act ("CEQA") under the Class 1 exemp0on of exis0ng facili0es of Sec0on 15301 of Title 14 of the California Code of Regula0ons and said exemp0on is not negated by any excep0on under Sec0on 15300.2 of said Regulations.
ATTACHMENTS:
1. Resolution - NOC TR22-0300 2022 Annual Pavement Management Project
2. Notice of Completion.pdf
33 RESOLUTION NO. 2024-______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON
ACCEPTING THE PROJECT AS COMPLETE, AUTHORIZING THE PUBLIC WORKS
DIRECTOR TO FILE A NOTICE OF COMPLETION, AND RELEASING RETENTION
PAYMENT TO MARTIN BROTHERS CONSTRUCTION IN CONJUNCTION WITH THE 2022 ANNUAL PAVEMENT MANAGEMENT PROJECT (TR22-0300)
WHEREAS, the 2022 Annual Pavement Management Project (TR22-0300) consists of pavement rehabilitation by means of asphalt rubber cape seal and asphalt grind and overlay at various locations throughout the City, including digouts, curb ramp upgrades, new bicycle lane improvements, signage and striping on Donaldson Way (from Rio Del Mar to Eucalyptus Drive), Gisela Drive, Elke Drive, Rebecca Court, Rita Court, Jana Way, W Carolyn Drive (from Spikerush Circle to Donaldson Way), Donaldson Way (from Elliott Drive to Amarillo Drive), and Donaldson Way West (from Elliott Drive to Carolyn Drive) in American Canyon; and
WHEREAS, on August 1, 2023, the City Council authorized the award of a construction contract to Martin Brothers Construction in the amount of $1,813,354.18 and authorized the Public Works Director to approve and execute contract change orders in an aggregate amount not to exceed the Project Budget for the 2022 Annual Pavement Management Project (TR22-0300) (R2022-40); and WHEREAS, total project expenditures, including the construction contract, engineering and inspection services, material testing, and miscellaneous expenses, is estimated at $1,988,285; and WHEREAS, all contracted work, including Contract Change Order Nos. 1 through 3, has been completed at a total construction contract cost of $1,879,900.73; and WHEREAS, Martin Brothers Construction has completed all of the contracted work to the satisfaction of the Public Works Director.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of American Canyon hereby accepts the 2022 Annual Pavement Management Project (TR22-0300) as complete, authorizes the Public Works Director to file a Notice of Completion, and approves the release of a Retention payment to Martin Brother Construction.
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February, 2024, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Leon Garcia, Mayor
34 2
ATTEST: APPROVE AS TO FORM:
____________________________ _____________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 35 RECORDING REQUESTED BY:
City of American Canyon
4381 Broadway, Ste. 201
American Canyon, CA 94503
WHEN RECORDED RETURN TO:
City of American Canyon
4381 Broadway, Ste. 201
American Canyon, CA 94503
Exempt from recording fee pursuant to Government Code Section 27383
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the interest or estate stated in Paragraph 3 herein in the real property herein described is owned by:
City of American Canyon
4381 Broadway, Ste. 201
American Canyon, CA 94503
2. That the full name and address of the owner of said interest or estate, if there is only one owner, and that the full names and addresses of all the co-owners who own said interest or estate as tenants in common, as joint tenants, or otherwise, if there is more than one owner, are set forth in the preceding paragraph.
3. That the nature of the original contract, if any, for said work of improvement was: the 2022 ANNUAL PAVEMENT MANAGEMENT PROJECT (TR22-0300) which consists of pavement rehabilitation by means of asphalt rubber cape seal and asphalt grind and overlay at various locations throughout the City, including digouts, curb ramp upgrades, new bicycle lane improvements, signage and striping on Donaldson Way (from Rio Del Mar to Eucalyptus Drive), Gisela Drive, Elke Drive, Rebecca Court, Rita Court, Jana Way, W Carolyn Drive (from Spikerush Circle to Donaldson Way), Donaldson Way (from Elliott Drive to Amarillo Drive), and Donaldson Way West (from Elliott Drive to Carolyn Drive) in American Canyon.
4. That on the 6th day of February, 2024 a work of improvement on the real property herein described was completed.
5. That the name of the original contractor for said work of improvement was:
Martin Brothers Construction
8801 Folsom Blvd, Suite 260
Sacramento, CA 95838
6. That the name and address of the transferor is:
Martin Brothers Construction
8801 Folsom Blvd, Suite 260
Sacramento, CA 95838
7. That the real property referred to herein is situated in the County of Napa, State of California, at the following locations within the City of American Canyon, California:
Donaldson Way (from Rio Del Mar to Eucalyptus Drive), Gisela Drive, Elke Drive, Rebecca Court, Rita Court, Jana Way, W Carolyn Drive (from Spikerush Circle to Donaldson Way), Donaldson Way (from Elliott Drive to Amarillo Drive), and Donaldson Way West (from Elliott Drive to Carolyn Drive).
36 Notice of Completion
By: CITY OF AMERICAN CANYON
_________________________________
Erica Ahmann Smithies, P.E.
Public Works Director
37 CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
CONSENT
ITEM NUMBER: 10.
TITLE
Resolution of Local Support for the NVTA Vision Zero Plan
RECOMMENDATION
Adopt a resolution supporting the Napa Valley Transportation Authority Vision Zero Plan.
CONTACT
Erica Ahmann Smithies, P.E., Public Works Director
BACKGROUND & ANALYSIS
On October 18, 2023 the Napa Valley Transporta3on Authority (NVTA) Board adopted a Vision Zero Plan. Vision Zero is a transporta3on system strategy to eliminate fatal and severe injury crashes on roadways while increasing safe, healthy and equitable mobility for all.
Na3onal best prac3ces and policies support the adop3on of comprehensive safety ac3on plans with the goal of improving roadway safety for all transporta3on modes countywide and to support the requirement under mul3ple grant funding programs. NVTA, with the assistance of its consultant, Fehr & Peers, developed a Countywide Vision Zero Plan. This data-driven and community-focused effort complements the City of American Canyon's 2022 Local Roadway Safety Plan.
The NVTA Vision Zero Plan iden3fied and evaluated hot spots and systemic risk factors on Napa Valley’s roadway network using collision records between 2015 and 2021. There were 571 severe injuries or fatali3es in this 3meframe countywide. The data was used to evaluate loca3ons with frequent severe injury or fatality collisions and to iden3fy where to implement safety enhancements based on injury risk factors. 18 percent of the above collisions involved pedestrians and bicyclists resulting in serious injuries or fatalities.
Community engagement efforts and equity-focused analysis supported the projects and strategies recommended in the plan. Projects reflect engineering and non-engineering countermeasures that are in line with the Safe System Approach that seeks to reduce speed, separate users in space and 3me, and provide redundancy using proven safety countermeasures. Complementary program, policy, and prac3ce recommenda3ons are also iden3fied to infuse safety on all Napa Valley roadways.
38 NVTA is asking each of the County jurisdic3ons for a local resolu3on of support of the Vision Zero Plan and the goal of elimina3ng traffic collisions resul3ng in serious injuries or fatali3es in Napa County by 2030. Please visit NVTA's website to learn more about Vision Zero and the Final Report.
Staff recommends City Council adopt a resolution of local support for NVTA's plan.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Transporta3on: "Improve the transporta3on network within the City to alleviate conges3on and enhance the quality of life for the community."
FISCAL IMPACT
There is no fiscal impact with the adoption of the resolution.
ENVIRONMENTAL REVIEW
15378(b) - The ac3on is not a "Project" subject to the California Environmental Quality Act ("CEQA") because it does not qualify as a "Project" under Public Resources Code Sec3ons 21065 and 21080 and in Section 15378(b) of Title 14 of the California Code of Regulations.
ATTACHMENTS:
1. Resolution
39 RESOLUTION NO. 2024-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON SUPPORTING THE NAPA
VALLEY TRANSPORTATION AUTHORITY VISION ZERO PLAN
WHEREAS, on October 18, 2023, the Napa Valley Transportation Authority (NVTA) adopted a Vision Zero Plan which is a transportation system strategy designed to eliminate fatal and severe injury crashes on roadways while increasing safe, healthy and equitablemobility for all; and WHEREAS, national best practices and policies support the adoption of comprehensive safety action plans with the goal of improving roadway safety for all transportation modes countywide; and WHEREAS, according to injury collision data collected between 2015-2021 from the Statewide Integrated Traffic Records System, there were a total of 4,651 injury collisions in Napa County, of which 571 were serious injury or fatal collisions; and
WHEREAS, in the pastseven years, 18 percent of collisions involving pedestrians and bicyclists resulted in serious injuries or fatalities; and
WHEREAS, the NVTA Vision Zero Plan’s goal is to eliminate traffic collisions resulting in serious injuries or fatalities in Napa County by 2030; and
WHEREAS, itis a priority for the City to reduce transportation-related deaths and serious injuries as much as practical; and
WHEREAS, NVTA’s Vision Zero Plan meets the safety plan requirements of several competitive grant programsfor which the City and its partner agencies may seek funding.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of American Canyon supports the Napa Valley Transportation Authority’s adoption of its Vision Zero Plan.
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February, 2024 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Leon Garcia, Mayor
ATTEST: APPROVE AS TO FORM:
____________________________ _____________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 40 CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
CONSENT
ITEM NUMBER: 11.
TITLE
Emergency Sewer Repair on Andrew Road
RECOMMENDATION
Take the following actions related to the Andrew road Emergency Sewer Repair Project:
1. Adopt a resolu0on adding Capital Improvement Project Andrew Road Emergency Sewer Repair (WW24-0100);
2. Authorizing a project budget of $175,000 for WW24-0100;
3. Authorizing a budget transfer of $175,000 from Wastewater Enterprise Fund Reserves to WW24-0100;
4. Awarding a construc0on contract to Ghilo= Construc0on Company for an amount of $125,000;
5. Authorizing the City Manager to execute the construction contract; and
6. Authorizing the Public Works Director to approve change orders up to the budgeted amount.
CONTACT
Erica Ahmann Smithies, P.E., Public Works Director
BACKGROUND & ANALYSIS
On Thursday morning, January 25, 2024, City staff were conduc0ng rou0ne maintenance on a sec0on of sewer main on Andrew Road at Thayer Way when a por0on of asbestos clay pipe and soil collapsed in on the cleaning equipment. Staff were unable to retrieve the equipment and mobilized addi0onal staff to detour through traffic and start bypassing the sewer upstream at Crawford Way while they determined next steps. Staff contacted Ghilo= Construc0on to make pipeline repairs as the depth of the sewer line, the extremely wet soil condi0ons, and the cri0cal need to reestablish sewer service were beyond the available capacity of our staff resources.
While a spot repair can usually be made on certain sewer main materials (i.e. steel, concrete, pvc, etc.), clay pipe is more suscep0ble to cracking beyond the ini0al damage point therefore staff recommended to the City Manager the replacement of the en0re segment between manholes on Thayer and Crawford Way, or approximately 500 feet of pipe. In addi0on, staff considered the age of the existing clay pipe (over 60 years) and is on the list to prioritize for a capital project.
Ghilo= Construc0on Company, who has successfully assisted the City on other emergency repairs, 41 was able to mobilize within 24 hours of the call. Ghilo= made a temporary spot repair to remove the City equipment, restore flow through the weekend, and allow 0me to inspect the en0re segment (manhole to manhole) for residen0al sewer lateral connec0on prior to commencing full pipe main replacement on Monday, January 29, 2024.
Ghilo= provided the City with a $125,000 es0mate based on 0me and materials to replace the 500 feet of pipe, manhole to manhole. The work assumed standard shield/shoring for the 12-foot deep main, residen0al sewer lateral connec0on, no major groundwater or other conflicts, proper disposal of the asbestos clay pipe, and restora0on of the trench with pavement. The cost es0mate was rela0vely low considering the depth of the pipe and emergency mobiliza0on effort, but City staff were able to offset some of the burden by opera0ng the sewer bypass and provide traffic control through the neighborhood.
Delaying the work could have resulted in the undermining of Andrew Road as there was considerable amounts of groundwater water flowing through the sewer pipe even while bypassing at Crawford Way. And due to forecasted weather condi0ons at the 0me this staff report was being wriGen, work needed to be expedited immediately. The City Manager ini0ally authorized the emergency work to proceed and is seeking ratification of the contract and budget retroactively.
Due to the unknown cause of pipe failure other than cleaning, staff is also recommending that a follow-up project be priori0zed for FY24/25 to replace the remaining sec0ons of similar pipe between Crawford and Wilson Way, or approximately 1,800 linear feet.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Not applicable.
FISCAL IMPACT
The contract is structured as a 0me and materials contract with an ini0al not-to-exceed amount of $125,000. The Public Works Director is reques0ng a con0ngency of $50,000 in order to process any necessary change orders for unforeseen circumstances as well as poten0al geotechnical assistance and staff 0me for a total budget of $175,000. The cost of the repairs will be funded by the Wastewater Enterprise Fund Reserves.
ENVIRONMENTAL REVIEW
15301 - The Project is exempt from review under the California Environmental Quality Act ("CEQA") under the Class 1 exemp0on of exis0ng facili0es of Sec0on 15301 of Title 14 of the California Code of Regula0ons and said exemp0on is not negated by any excep0on under Sec0on 15300.2 of said Regulations.
ATTACHMENTS:
42 1. Resolution Andrew Road
2. Ghilotti Cost Estimate
43 RESOLUTION NO. 2024-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON (1) ADDING CAPITAL IMPROVEMENT PROJECT ANDREW ROAD EMERGENCY SEWER REPAIR (WW24-0100); (2) AUTHORIZING A PROJECT BUDGET OF $175,000 FOR WW24-0100; (3) AUTHORIZING A BUDGET TRANSFER OF $175,000 FROM WASTEWATER ENTERPRISE FUND RESERVES TO WW24-0100; (4) AWARDING A CONSTRUCTION CONTRACT TO GHILOTTI CONSTRUCTION COMPANY FOR AN AMOUNT OF $125,000; (5) AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONSTRUCTION CONTRACT; AND (6) AUTHORIZING THE PUBLIC WORKS DIRECTOR TO
APPROVE CHANGE ORDERS UP TO THE BUDGETED AMOUNT
WHEREAS, on January 25, 2024, City staff were conducting routine maintenance on a section of sewer main on Andrew Road at Thayer Way when a portion of asbestos clay pipe and soil collapsed in on the cleaning equipment requiring an immediate emergency response by the Public Works Department to maintain sanitary service essential to the public health; and WHEREAS, City staff contacted Ghilotti Construction to make emergency pipeline repairs as the depth of the sewer line, the extremely wet soil conditions, and the critical need to reestablish sewer service were beyond the available capacity of our staff resources; and WHEREAS, Ghilotti provided the City with a $125,000 estimate based on time and materials to replace 500 feet of pipe, manhole to manhole, on Andrew Road between Thayer and Crawford Way. The work assumed standard shield/shoring for the 12-foot deep main, residential sewer lateral connection, no major groundwater or other conflicts, proper disposal of the asbestos clay pipe, and restoration of the trench with pavement; and
WHEREAS, the Public Works Director is requesting a contingency of $50,000 in order to process any necessary change orders for unforeseen circumstances as well as potential geotechnical assistance and staff time for a total project budget of $175,000; and
WHEREAS, an appropriation from the Wastewater Enterprise Fund is needed to cover the $175,000 in emergency expenditures.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of American Canyon resolves as follows:
1. Add Capital Improvement Project Andrew Road Emergency Sewer Repair (WW24-0100); and
2. Authorize a project budget of $175,000 for WW24-0100; and
3. Authorize a budget transfer of $175,000 from Wastewater Enterprise Fund Reserves to WW24- 0100; and
4. Award a construction contract to Ghilotti Construction Company for an amount of $125,000; and
5. Authorize the City Manager to execute the construction contract; and
6. Authorize the Public Works Director to approve change orders up to the budgeted amount. 44 2
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February, 2024 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Leon Garcia, Mayor
ATTEST: APPROVE AS TO FORM:
____________________________ _____________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 45 Billing Status Report Change Order Detail - Job 2183 Ghilotti Construction Company, Inc. All Billings - Contract: 2183
DATES LAST PAYMENT
Billing Perform Report Submit Number Period Billed Paid Balance Company
DISPOSITION VARIANCE
Pending Disputed Writeoff AltBillNo
999 • Pricing
5.0 F 1/24/24 1/25/24 P 16,620.51 -16,620.51 -16,620.51 GCC Andrew Rd Daily Crew
6.0 F 1/24/24 1/25/24 P 8,726.93 -8,726.93 -8,726.93 GCC Andrew Dr ROM Pave SS Repair, Demob and Clean Up.
7.0 F 1/24/24 1/25/24 P 44,199.10 -44,199.10 -44,199.10 GCC Andrew Dr Materials
999
Grand Totals
1/25/2024 2:58PM Copyright 1996-2023. Nice Touch Solutions, Inc. Page 1 46 DAILY EXTRA WORK REPORT
City Of American CanyonContractor Job: 2183 - Los Altos Place Sewer RepairWork Performed By: Ghilotti Construction Company, Inc.Description of Work: Andrew Rd Daily Crew Contract: 2183 Change Order 999
Billing Number 5.0Report Date 1/25/2024Perform Date 1/24/2024 Labor Charges
RT Labor
SC
OT/DT Labor
SC
Subtotal LaborSubsistenceOther Expenses
MU
Labor Total
4,516.72
406.50738.49
66.46 5,728.17
0.000.00
2,004.86
7,733.03
9.00%9.00%
35.00%
Equipment Charges
Subtotal
MU
Equipment Total
3,648.24
547.24
4,195.48
15.00%
Material Charges
Subtotal
MU
Material Total
4,080.00
612.00
4,692.00
15.00%
Activity Total 16,620.51Work Total 16,620.51Bill Subtotal 16,620.51Bill Total + 16,620.51 For Owner/Resident Engineer's Use Only
New BillResubmittal
Approved for PaymentReturned for Correction Date Received:
Date of Action:
Accepted:
Customer:
Contractor:
Date:Date:
NTS Universal Bill Form Page 1 www.ewbills.com
Report No.
Labor Charges
Craft/Level Employee Name RT Hrs OT/DT Hrs Subs Units RT Rate OT/DT Rate Subs Rate Extended L01 OE OF1 O Foreman 8.00 1.00 93.650 124.010 873.210L02 OE OE2 Operator 24.00 3.00 91.920 121.515 2,570.625L03 LBR L32 Laborer 24.00 3.00 65.060 83.310 1,811.370 Equipment Charges
Equipment ID Class Make Model A1 A2 RT Hrs OT Hrs Extended RT Rate OT Rate Delay Factor E01 PT103 TRUCK T&TT 06-12 9.00 42.390 381.510E02 UT20 TRUCK T&TT 20-28 9.00 57.710 519.390E03 EX59 HCECL CAT 315F 9.00 71.770 645.930E04 EX69 HCECL CAT 315F 9.00 71.770 645.930E05 L63 LDRRT CAT 938K 9.00 161.720 1,455.480 Material/Specialist Work/Lump Sum or Unit Price Payment Number Date Vendor Name and Description Units Unit Price Extended M01 V. Dolan Trucking / 3 Super Dumps 24.000 HR 170.00000 4,080.00 47 DAILY EXTRA WORK REPORT
City Of American CanyonContractor Job: 2183 - Los Altos Place Sewer RepairWork Performed By: Ghilotti Construction Company, Inc.Description of Work: Andrew Dr ROM Pave SS Repair, Demob and Clean Up.
Contract: 2183 Change Order 999
Billing Number 6.0Report Date 1/25/2024Perform Date 1/24/2024 Labor Charges
RT Labor
SC
OT/DT LaborSubtotal LaborSubsistenceOther Expenses
MU
Labor Total
2,588.56
232.97
0.00 2,821.53
0.000.00
987.54
3,809.07
9.00%
35.00%
Equipment Charges
Subtotal
MU
Equipment Total
3,391.40
508.71
3,900.11
15.00%
Material Charges
Subtotal
MU
Material Total
885.00132.75
1,017.75
15.00%
Activity Total 8,726.93Work Total 8,726.93Bill Subtotal 8,726.93Bill Total + 8,726.93 For Owner/Resident Engineer's Use Only
New BillResubmittal
Approved for PaymentReturned for Correction Date Received:
Date of Action:
Accepted:
Customer:
Contractor:
Date:Date:
NTS Universal Bill Form Page 1 www.ewbills.com
Report No.
Labor Charges
Craft ID Employee Name RT Hrs OT/DT Hrs Subs Units RT Rate OT/DT Rate Subs Rate Extended L01 LBR S2443 VF Medeiros 8.00 75.670 605.360L02 OE OE3 DB Turknett 8.00 90.440 723.520L03 LBR LN4 D Turknett 8.00 63.810 510.480L04 OE OF1 O Foreman 8.00 93.650 749.200 Equipment Charges
Equipment ID Class Make Model A1 A2 RT Hrs OT Hrs Extended RT Rate OT Rate Delay Factor E01 BH39 LDRRT CAT 430F2 8.00 94.410 755.280E02 DT71 TRUON TRUN 2AXL 8.00 73.340 586.720E03 UT28 TRUCK T&TT 20-28 6.00 57.710 346.260E04 PT122 TRUCK T&TT 06-12 6.00 42.390 254.340E05 AG03 PGT-C ZIPR AZ500 8.00 130.910 1,047.280E06 R49 ROVIB CAT CB24B 8.00 50.190 401.520 Material/Specialist Work/Lump Sum or Unit Price Payment Number Date Vendor Name and Description Units Unit Price Extended M01 1217733-1 11/29/2023 All Star Rents / Roller 1.000 LS 328.19000 328.19M02 34208817-001 11/29/2023 Herc Rentals / Steel Plate 1.000 LS 556.81000 556.81 48 DAILY EXTRA WORK REPORT
City Of American CanyonContractor Job: 2183 - Los Altos Place Sewer RepairWork Performed By: Ghilotti Construction Company, Inc.Description of Work: Andrew Dr Materials Contract: 2183 Change Order 999
Billing Number 7.0Report Date 1/25/2024Perform Date 1/24/2024 Labor Charges
Equipment Charges
Material Charges
Subtotal
MU
Material Total
38,434.00
5,765.10
44,199.10
15.00%
Activity Total 44,199.10Work Total 44,199.10Bill Subtotal 44,199.10Bill Total + 44,199.10 For Owner/Resident Engineer's Use Only
New BillResubmittal
Approved for PaymentReturned for Correction Date Received:
Date of Action:
Accepted:
Customer:
Contractor:
Date:Date:
NTS Universal Bill Form Page 1 www.ewbills.com
Report No.
Material/Specialist Work/Lump Sum or Unit Price Payment Number Date Vendor Name and Description Units Unit Price Extended M01 Herc Rentals / Shoring & Plates 1.000 LS 6,000.00000 6,000.00M02 Vulcan Materials / Class 2 AB 980.000 T 18.35000 17,983.00M03 Vulcan Materials / Drain Rock 90.000 T 32.40000 2,916.00M04 Vulcan Materials / Asphalt 30.000 T 92.00000 2,760.00M05 Pace Supply Corp / Pipe & Fittings 1.000 LS 8,775.00000 8,775.00 49 Pace Supply | Cart https://pacesupply.com/Cart
1 of 2 1/25/2024, 2:54 PM
50 Pace Supply | Cart https://pacesupply.com/Cart
2 of 2 1/25/2024, 2:54 PM
51 CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
CONSENT
ITEM NUMBER: 12.
TITLE
Partial Acceptance of Watson Ranch Lot 10 Phase 1 Improvements
RECOMMENDATION
Adopt a Resolu+on of the City Council of the City of American Canyon for par+al acceptance of the public improvements associated with the Watson Ranch Lot 10 Phase 1 Improvements Project.
CONTACT
Erica Ahmann Smithies, P.E., Public Works Director/City Engineer Edison Bisnar, P.E., Senior Civil Engineer
BACKGROUND & ANALYSIS
On September 21, 2021, The City of American Canyon City Council approved the Lot 10 Ves+ng Tenta+ve Map, Resolu+on 2021-75, to create 219 single family home lots on a 21.17 acres property within the Watson Ranch Specific Plan. The property is located north of Vintage Ranch and accessible from Rolling Hills Drive and Rio Del Mar through Mallen Way at the terminus of Newell Drive.
On January 24, 2022, The City of American Canyon Public Works Department approved the Lot 10 Rough Grading Plans.
On June 1, 2022, The City of American Canyon Public Works Department approved the Lot 10 Improvement Plans.
On January 4, 2024, the Record Drawings and Cer+fied Le=ers associated with the Watson Ranch Lot 10 Phase 1 Improvements has been submitted to Public Works.
The following are the completed public street improvements, including u+li+es associated with the Watson Ranch Lot 10 Phase 1 Project.
1. Cartier Street, from Sta 10+00 to Sta 12+85
2. Pewter Street
52 3. Pewter Court
4. Balsa Court
5. Brisa Court
6. Junegrass Street
7. Junegrass Court
8. Capri Court
9. Datura Street, from Sta 10+00 to Sta 11+82.55
10. Ericson Street, from Sta 10+00 to Sta 10+46.95
11. Goldback Street, from Sta 10+00 to Sta 10+45.59 & 10+66.30 Public Works staff recommends that the Phase 1 public improvements be par+ally accepted into the City’s system for opera+on and maintenance, with the excep+on of the punch list repair items on sidewalk (does not affect pedestrian use) and minor pavement repair (does not affect vehicular use) which will be deferred for City acceptance at a future date, after completion of required repairs.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Infrastructure: "Develop and maintain infrastructure resources to support sustainable growth."
FISCAL IMPACT
All costs associated with the opera+on and maintenance of the public facili+es will be the responsibility of the City.
ENVIRONMENTAL REVIEW
Pursuant to the California Environmental Quality Act, the Final Environmental Impact Report for the Project was presented at a no+ced public hearing held on October 4, 2018. The Planning Commission adopted Resolu+on 2018-19 recommending that the City Council adopt the Mi+ga+on Monitoring and Reporting Program.
ATTACHMENTS:
1. Resolution
2. Exhibit A: Lot 10 Phase 1 Improvement Record Drawings
3. Exhibit B: Punch List Report 01-30-2024
53 RESOLUTION NO. 2024 - _____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON FOR PARTIAL ACCEPTANCE OF THE PUBLIC IMPROVEMENTS ASSOCIATED WITH THE WATSON RANCH LOT 10 PHASE 1
IMPROVEMENTS PROJECT
WHEREAS, on September 21, 2021, The City of American Canyon City Council approved the Lot 10 Vesting Tentative Map, Resolution 2021-75, to create 219 single family home lots on a 21.17 acres property within the Watson Ranch Specific Plan; and
WHEREAS, on January 24, 2022, The City of American Canyon Public Works Department approved the Lot 10 Rough Grading Plans; and
WHEREAS, on June 1, 2022, The City of American Canyon Public Works Department approved the Lot 10 Improvement Plans; and
WHEREAS, on January 4, 2024, the Record Drawings and Certified Letters associated with the Watson Ranch Lot 10 Phase 1 Improvements has been submitted to Public Works (Exhibit A) and was found to be in substantial conformance with the approved Improvement Plans; and WHEREAS, the following are the completed public street improvements, including utilities associated with the Watson Ranch Lot 10 Phase 1 Project.
1. Cartier Street, from Sta 10+50 to Sta 12+50
2. Pewter Street
3. Pewter Court
4. Balsa Court
5. Brisa Court
6. Junegrass Street
7. Junegrass Court
8. Capri Court
9. Datura Street, from Sta 10+00 to Sta 11+82.55
10. Ericson Street, from Sta 10+00 to Sta 10+46.95
11. Goldback Street, from Sta 10+00 to Sta 10+45.59 & 10+66.30 NOW, THEREFORE, BE IT FURTHER RESOLVED that the City Council of the City of American Canyon hereby partially accepts all the public improvements into the City’s system for operation and maintenance, with the exception of the punch list repair items (Exhibit B) on sidewalk (does not affect pedestrian use), and minor pavement repair (does not affect vehicular use) which will be deferred for City acceptance at a future date, after completion of required repairs.
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February 2024, by the following vote:
54 AYES:
NOES:
ABSTAIN:
ABSENT:
________________________________
Leon Garcia, Mayor
ATTEST: APPROVED AS TO FORM:
______________________________ ______________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney Attachments:
Resolution
Exhibit A: Watson Ranch Lot 10 Phase 1 Improvements Record Drawings.
Exhibit B: Outstanding Punch List Items
55 06/16/2022
DocuSign Envelope ID: 95C853AC-C2B4-4FBA-87D9-0A698F46B3C3 7/15/2022
GEOFF BELYEA
DocuSign Envelope ID: 2C465694-B426-4DA4-B926-FEF89D766D40 7/25/2022
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
56 JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP02.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 ABBREVIATIONS
EXISTING PROPOSED DESCRIPTION
ENGINEER'S NOTES, LEGEND, & ABBREVIATIONS IMPROVEMENT PLANS 2 ENGINEER'S GENERAL NOTES 2
CITY RECYCLED WATER NOTES LEGEND ‐ ‐ ‐ ‐ “ ” “ ” “ ” “ ” “ ” “ ” “ ” City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
57 TYPICAL
41' x 78' LOT
A
6" CURB W/ CATCH GUTTER TO BEVELED CURB TRANSITION DETAIL
SECTION A
RESIDENTIAL DRIVEWAY DETAIL
RESIDENTIAL CURB CUTS & DRIVEWAY DETAIL (NO SIDEWALK)
4" OR 5" BEVELED CATCH CURB & GUTTER AT DRIVEWAY APRON
ROADWAY UNDERDRAIN
TYPICAL STREET SECTION
TYPICAL 48' STREET SECTION
TYPICAL 58' STREET SECTION
TYPICAL 58' STREET SECTION
TYPICAL EVA SECTION
UTILITY TRENCH DETAIL
CITY OF AMERICAN CANYON TYPE "A" CURB AND GUTTER DETAIL 6" CONCRETE BAND DETAIL
PAVEMENT DESIGN CHART STREET SECTIONS & DETAILS IMPROVEMENT PLANS 3 TYPICAL LOT FINISH GRADING
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP03.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 3 47
BEVELED CURB CONFORM CHART
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024 58 DETAILS
IMPROVEMENT PLANS 4 4JOB NUMBER SHEET NUMBER OF 1217-062
CITY OF AMERICAN CANYON CALIFORNIA
LOT 10 AT WATSON RANCH
DRAWN BY:
DATE:
JH
PROJ. ENGR:
PROJ. MGR:
WPC
MAY 3, 2022
AVG G:\1217-062\ACAD\IP\IP04.DWG
CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456 47 SANITARY SEWER DROP BOWL DETAIL EVA SWING GATE DETAIL SANITARY SEWER CLEANOUT RISER DETAIL EVA SWING GATE DETAIL SANITARY SEWER OVERFLOW/ CLEANOUT RISER DETAIL 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
59 I
R R
R
R
R
R
I
I
I
I
I
JUNEGRASS STREET
ERICSON STREET
GOLDBACK STREET
ERICSON COURT
GOLDBACK COURT BALSA COURT BRISA COURT DATURA STREET DATURA STREET CAPRI COURT
CAPRI COURT PEWTER STREET
PEWTER COURT
1 2
3 4
5 6
7 8
20 21
22 23
24 25
26 27
9 10
11 12
13 14
15 16
17 18
19 28
29 30
31 32
33 34
35 36
37 38
108
129
109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128
130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151
173
152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196
39 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 65
66 64
67 68
69 70
71 72
73 76
74 75
77 78
79 80 81
95 82
83 84
96 97 98 99
100
101 102
103 104 105 106
107
85 86
87 88 89 90 91 92 93 94
PARCEL E
PARCEL A
PARCEL B PARCEL C
PARCEL D (EVA)
PARCEL D (EVA)
PARCEL F (EVA)
CARTIER STREET CARTIER COURT
CAUTION EXISTING LIVE GAS LINE!!
JUNEGRASS COURT
NOTES:
GRAPHIC SCALE
80' 0' 40' 80' 160'
STORM DRAIN SCHEDULE SANITARY SEWER SCHEDULE DOMESTIC WATER SCHEDULE
RECLAIMED WATER SCHEDULE
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP05.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47MASTER UTILITY PLAN IMPROVEMENT PLANS
5 5
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
60 BIORETENTION AREA
RIO DEL MAR
CARTIER STREET
ERICSON STREET
GOLDBACK STREET
JUNEGRASS STREET PEWTER STREET
PEWTER COURTBALSA COURT BRISA COURT DATURA STREET CAPRI COURT
CAPRI COURT DATURA STREET
JUNEGRASS COURT
GOLDBACK COURT
ERICSON COURT
RIO DEL MAR
CARTIER COURT
DMA 1
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
38 37
36 35
34 33
32 31
30 29
28 27
26 25
24 23
22 21
20 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
65 66
67 68
69 70
71 72
73 74
75 76
77 78
79 80
81 82
83 84
85 86
87 88 89
90 91 92 93 94
95 96 97 98 99
100
101 102
103 104 105
106 107
19 RIO DEL MAR
ROLLING HILLS DRIVE
LOOP ROAD LOOP ROAD
G:\1217-062\ACAD\IP\IP06.DWG
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP06.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 EXISTING PROPOSED DESCRIPTION
LEGEND
DMA #
LOT 10 STORMWATER TREATMENT SUMMARY
DMA ID
DRAINAGE AREA
(SF±)
SURFACE
TYPE
RUNOFF
FACTOR
SIZING
FACTOR
TREATMENT AREA
REQUIRED (SF±)
BASIN D AREA
PROVIDED (SF±) STORMWATER CONTROL PLAN IMPROVEMENT PLANS 6 6
GRAPHIC SCALE
80' 0' 40' 80' 160'
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
61 RIO DEL MAR
ROLLING HILLS DRIVE
LOOP ROAD
RIO DEL MAR
CARTIER STREET
ERICSON STREET
GOLDBACK STREET
JUNEGRASS STREET PEWTER STREET
PEWTER COURT BALSA COURT BRISA COURT DATURA STREET
CAPRI COURT LOOP ROAD DATURA STREET
JUNEGRASS COURT
GOLDBACK COURT
ERICSON COURT
RIO DEL MAR
CARTIER COURT
PARCEL C
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
38 37
36 35
34 33
32 31
30 29
28 27
26 25
24 23
22 21
20 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172
173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219
39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
54 55 56 57 58 59 60 61 62
63 64
65 66
67 68
69 70
71 72
73 74
75 76
77 78
79 80
81 82
83 84
85 86
87 88
89 90
91 92
93 94
95 96 97 98 99
100
101 102
103 104 105 106
107
19 PARCEL D
PARCEL F
PARCEL D
CONTINENTAL CROSSWALK DETAIL SIGNING & STRIPING IMPROVEMENT PLANS 7 7
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP07.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 LEGEND
GRAPHIC SCALE
80' 0' 40' 80' 160'
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
62 APPLICABLE (BUT NOT LIMITED TO) CURRENT
CASQA STORMWATER BMPCONSTRUCTION
HANDBOOK
WDID #: 2 28C393190
RISK LEVEL 2 SITES -
BEST MANAGEMENT PRACTICE NOTES:
EROSION AND SEDIMENT CONTROL/SWPPP PLAN NOTES: EROSION CONTROL NOTES IMPROVEMENT PLANS 8 JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP08.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 8 47
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
63 EROSION CONTROL DETAILS IMPROVEMENT PLANS 9
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP09.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 9 47 City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024 64 1
2 3
4 5
6 7
8 20
21 22
23 24
25 26
27 9
10 11
12 13
14 15
16 17
18 19
28 29
30 31
32 33
34 35
36 37
38 108
129
109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151
173
152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196
39 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 65
66 64
67 68
69 70
71 72
73 76
74 75
77 78
79 80 81
95 82
83 84
96 97 98 99 100
101 102 103 104 105 106
107
85 86
87 88 89 90 91 92 93 94
PARCEL E
PARCEL A
PARCEL B PARCEL C
PARCEL D (EVA)
PARCEL D (EVA)
PARCEL F (EVA)
42" SERVICE CLEARANCE REQUIRED IN FRONT CONTROL PANEL
S CARTIER STREET
ERICSON STREET
GOLDBACK STREET
JUNEGRASS STREET PEWTER STREET
PEWTER COURT BALSA COURT BRISA COURT DATURA STREET
CAPRI COURT DATURA STREET
JUNEGRASS COURT
GOLDBACK COURT
ERICSON COURT
CARTIER COURT
GRAPHIC SCALE
80' 0' 40' 80' 160'
S
C
QUALIFIED SWPPP PRACTITIONER (QSP)
MARK KNOWN LOCATIONS*
LEGEND EROSION CONTROL PLAN IMPROVEMENT PLANS
10 JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP10.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 10 47
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
65 1
2 3
4 5
6 7
8 20
21 22
23 24
25 26
27 9
10 11
12 13
14 15
16 17
18 19
28 29
30 31
32 33
34 35
36 37
38 108
129
109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151
173
152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196
39 197 198 199 200 201 202 203 204 206 207 208 209 210 211 212 213 214 215 216 217 218 219 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 65
66 64 67
68 69
70 71
72 73 76
74 75
77 78
79 80
81 95
82 83
84 96 97 98 99 100
101 102
103 104 105 106
107
85 86 87
88 89 90 91 92 93 94
12 RIO DEL MAR
RIO DEL MAR
RIO DEL MAR ROLLING HILLS DRIVE LOOP ROAD
PARCEL A
PARCEL B PARCEL C
PARCEL D (EVA)
PARCEL D (EVA)
PARCEL F (EVA)
PARCEL E
205
NEWELL DRIVE WEST
13 14
15 16
17 18
19 20 21
22 23 24 25
26 27 28
29 30
31 32
33 34
35 CARTIER STREET
ERICSON STREET
GOLDBACK STREET
JUNEGRASS STREET PEWTER STREET
PEWTER COURT BALSA COURT BRISA COURT DATURA STREET
CAPRI COURT DATURA STREET
JUNEGRASS COURT
GOLDBACK COURT
ERICSON COURT
CARTIER COURT
GRAPHIC SCALE
80' 0' 40' 80' 160' PLAN AND PROFILE SHEET INDEX IMPROVEMENT PLANS 11 LEGEND
#
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP11.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 11 47
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
66 1 20 108 109 110 111
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
60 70
80 90
100
60 70
80 90
100
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP12.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 14+50) SEE SHEET 13
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS CARTIER STREET (STA 10+00 - STA 14+50) 12 SCALE:
CARTIER STREET (STA 10+00 - STA 14+50)
1" = 20'
12 PEWTER STREET
SEE SHEET 17
KEY MAP
12 MATCHLINE (STA 14+50) SEE SHEET 13
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) FUTURE PHASE 2 IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
67 113 114 115 116 117 118 119 120 121 122
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
80 90
100
110
120
80 90
100
110
120
14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP13.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 18+50) SEE SHEET 14
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS CARTIER STREET (STA 14+50 - STA 18+50) 13 SCALE:
CARTIER STREET (STA 14+50 - STA 18+50)
1" = 20'
13 KEY MAP
13 MATCHLINE (STA 14+50) SEE SHEET 12 MATCHLINE (STA 18+50) SEE SHEET 14 MATCHLINE (STA 14+50) SEE SHEET 12 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
68 122 123 124 125 126 127 128
CAUTION EXISTING LIVE GAS LINE!!
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
100
110
120
130
140
100
110
120
130
140
18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP14.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 18+50) SEE SHEET 13
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS CARTIER COURT (STA 18+50 - STA 22+00) 14 SCALE:
CARTIER COURT (STA 18+50 - STA 22+00)
1" = 20'
14 KEY MAP
14 MATCHLINE (STA 18+50) SEE SHEET 13
DATURA STREET
SEE SHEET 16
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
69 84 83 82 81
PARCEL C
54 212
190
80 53 211 189
PARCEL B
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
90 100
110
120
130
90 100
110
120
130
9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP15.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 14+00) SEE SHEET 16
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS DATURA STREET (STA 10+00 - STA 14+00) 15 SCALE:
DATURA STREET (STA 10+00 - STA 14+00)
1" = 20'
15 KEY MAP
15 JUNEGRASS STREET
SEE SHEET 27
JUNEGRASS
COURT
SEE SHEET 28
GOLDACK
COURT
SEE SHEET 25
GOLDBACK STREET
SEE SHEET 24 MATCHLINE (STA 14+00) SEE SHEET 16
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024 70 189 167 145 124
190 168 146 125
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
90 100
110
120
130
90 100
110
120
130
14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP16.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 14+00) SEE SHEET 15
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS DATURA STREET (STA 14+00 - STA 18+00) 16 SCALE:
DATURA STREET (STA 14+00 - STA 18+00)
1" = 20'
16 KEY MAP
16 ERICSON COURT
SEE SHEET 22
CARTIER COURT
SEE SHEET 14
CARTIER STREET
SEE SHEET 13
ERICSON STREET
SEE SHEET 21 MATCHLINE (STA 14+00) SEE SHEET 15
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
71 20 21 22 23 24 25 26
108 129 151
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
60 70
80 90
100
60 70
80 90
100
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP17.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 13+00) SEE SHEET 18
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS PEWTER STREET (STA 10+00 - STA 13+00) 17 SCALE:
PEWTER STREET (STA 10+00 - STA 13+00)
1" = 20'
17 KEY MAP
17 CARTIER STREET
SEE SHEET 12
CARTIER STREET
SEE SHEET 12
ERICSON STREET
SEE SHEET 20 MATCHLINE (STA 13+00) SEE SHEET 18
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
72 151
173 196 39
31 PARCEL E
30 29
28 27
26 SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
60 70
80 90
100
60 70
80 90
100
13+00 13+50 14+00 14+50 15+00 15+50 16+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP18.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 15+50) SEE SHEET 19
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS PEWTER STREET (STA 13+00 - STA 15+50) 18 SCALE:
PEWTER STREET (STA 13+00 - STA 15+50)
1" = 20'
18 KEY MAP
18 MATCHLINE (STA 13+00) SEE SHEET 17
GOLDBACK STREET
SEE SHEET 23 MATCHLINE (STA 15+50) SEE SHEET 19 MATCHLINE (STA 13+00) SEE SHEET 17 City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
73 39
31 32 33 34 35 36 37 38
63 65 66 PARCEL B
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
70 80
90 100
110
70 80
90 100
110
15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP19.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 15+50) SEE SHEET 18
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS PEWTER COURT (STA 15+50 - STA 18+50) 19 SCALE:
PEWTER COURT (STA 15+50 - STA 18+50)
1" = 20'
19 KEY MAP
19 JUNEGRASS STREET
SEE SHEET 26 MATCHLINE (STA 15+50) SEE SHEET 18
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
74 22
23 24
25 129 130 131 132 133 134 135 136
151 152 153 154 155 156 157 158
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
70 80
90 100
110
70 80
90 100
110
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP20.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 13+50) SEE SHEET 21
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS ERICSON STREET (STA 10+00 - STA 13+50) 20 SCALE:
ERICSON STREET (STA 10+00 - STA 13+50)
1" = 20'
PEWTER STREET
SEE SHEET 17
20 KEY MAP
20 PEWTER STREET
SEE SHEET 17 MATCHLINE (STA 13+50) SEE SHEET 21
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
75 136
158
137 138 139 140 141 142 143 144
159 160 161 162 163 164 165 166
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
90 100
110
120
130
90 100
110
120
130
13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP21.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 16+75) SEE SHEET 22
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS ERICSON STREET (STA 13+50 - STA 16+75) 21 SCALE:
ERICSON STREET (STA 13+50 - STA 16+75)
1" = 20'
21 KEY MAP
21 MATCHLINE (STA 13+50) SEE SHEET 20 MATCHLINE (STA 16+75) SEE SHEET 22 MATCHLINE (STA 13+50) SEE SHEET 20 City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
76 144
166
145 146 147 148 149 150
167 168 169 170 171
172
CAUTION EXISTING LIVE GAS LINE!!
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
100
110
120
130
140
100
110
120
130
140
16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP22.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES IMPROVEMENT PLANS ERICSON COURT (STA 16+75 - STA 20+50) 22 SCALE:
ERICSON COURT (STA 16+75 - STA 20+50)
1" = 20'
DATURA
STREET
SEE SHEET
15 22
KEY MAP
22 DATURA
STREET
SEE SHEET 16 MATCHLINE (STA 16+75) SEE SHEET 21
EVA 1
SEE SHEET 33 MATCHLINE (STA 16+75) SEE SHEET 21
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
77 173 174 175 176 177 178 179 180 181 182 183
196 197 198 199 200 201 202 203 204 205
29 30
28 SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
70 80
90 100
110
70 80
90 100
110
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP23.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 14+50) SEE SHEET 24
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES GOLDBACK STREET (STA 10+00 - STA 14+50) IMPROVEMENT PLANS 23 SCALE:
GOLDBACK STREET (STA 10+00 - STA 14+50)
1" = 20'
23 KEY MAP
23 PEWTER
STREET
SEE SHEET
18 PEWTER STREET
SEE SHEET
18 MATCHLINE (STA 14+50) SEE SHEET 24
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
78 183
205 206 207 208 209 210 211 212
184 185 186 187 188 189 190
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
90 100
110
120
130
90 100
110
120
130
14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP24.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 18+25) SEE SHEET 25
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES GOLDBACK STREET (STA 14+50 - STA 18+25) IMPROVEMENT PLANS 24 SCALE:
GOLDBACK STREET (STA 14+50 - STA 18+25)
1" = 20'
24 KEY MAP
24 MATCHLINE (STA 14+50) SEE SHEET 23 MATCHLINE (STA 18+25) SEE SHEET 25 MATCHLINE (STA 14+50) SEE SHEET 23 DATURA
STREET
SEE SHEET
15 DATURA
STREET
SEE SHEET
16 City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
79 212
190 191 192 193 194 195
213 214 215 216 217 218 219
CAUTION EXISTING LIVE GAS LINE!!
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
100
110
120
130
140
100
110
120
130
140
18+00 18+50 19+00 19+50 20+00 20+50 21+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP25.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
GOLDBACK COURT (STA 18+25 - STA 21+00) IMPROVEMENT PLANS 25 SCALE:
GOLDBACK COURT (STA 18+25 - STA 21+00)
1" = 20'
EVA 1
SEE SHEET 33
25 KEY MAP
25 MATCHLINE (STA 18+25) SEE SHEET 24 MATCHLINE (STA 18+25) SEE SHEET 24
CONSTRUCTION NOTES
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
80 39 40 41 42 43 44 45 46 47
34 63 64 67 70 73
33 32
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
80 90
100
110
120
80 90
100
110
120
9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP26.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 14+00) SEE SHEET 27
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES
JUNEGRASS STREET (STA 10+00 - STA 14+00) IMPROVEMENT PLANS 26 SCALE:
JUNEGRASS STREET (STA 10+00 - STA 14+00)
1" = 20'
26 KEY MAP
26 PEWTER COURT
SEE SHEET 19
PEWTER STREET
SEE SHEET 18
BALSA COURT
SEE SHEET 29 MATCHLINE (STA 14+00) SEE SHEET 27
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
81 47
73 48 49 50 51 52 53 54 55
76 79 80 PARCEL C81
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
90 100
110
120
130
90 100
110
120
130
14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP27.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 MATCHLINE (STA 17+75) SEE SHEET 28
GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES
JUNEGRASS STREET (STA 14+00 - STA 17+75) IMPROVEMENT PLANS 27 SCALE:
JUNEGRASS STREET (STA 14+00 - STA 17+75)
1" = 20'
27 DATURA
STREET
SEE SHEET 15
KEY MAP
27 DATURA STREET
SEE SHEET 15
BRISA COURT
SEE SHEET 30 MATCHLINE (STA 14+00) SEE SHEET 26 MATCHLINE (STA 14+00) SEE SHEET 26 MATCHLINE (STA 17+75) SEE SHEET 28 City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
82 54 55
81 56 57 58 59 60 61 62
95 96 97 98 99
100
CAUTION EXISTING LIVE GAS LINE!!
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
100
110
120
130
140
100
110
120
130
140
18+00 18+50 19+00 19+50 20+00 20+50 21+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP28.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES
JUNEGRASS COURT (STA 17+75 - STA 21+50) IMPROVEMENT PLANS 28 SCALE:
JUNEGRASS COURT (STA 17+75 - STA 21+50)
1" = 20'
CAPRI COURT
SEE SHEET 31
28 EVA 2
SEE SHEET 34
KEY MAP
25 MATCHLINE (STA 17+75) SEE SHEET 27 MATCHLINE (STA 17+75) SEE SHEET 27 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
83 43 67 68 69
44 45 70 71 72
PARCEL B
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
80 90
100
110
120
80 90
100
110
120
9+50 10+00 10+50 11+00 11+50 12+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP29.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES BALSA COURT (STA 10+00 - STA 11+82) IMPROVEMENT PLANS 29 SCALE:
BALSA COURT (STA 10+00 - STA 11+82)
1" = 20'
JUNEGRASS STREET
SEE SHEET 26
29 KEY MAP
29 JUNEGRASS STREET
SEE SHEET 26
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
84 73
PARCEL B
48 74 75
49 50 76 77 78
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
90 100
110
120
130
90 100
110
120
130
9+50 10+00 10+50 11+00 11+50 12+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP30.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES
BRISA COURT (STA 10+00 - STA 11+82) IMPROVEMENT PLANS
30 SCALE:
BRISA COURT (STA 10+00 - STA 11+82)
1" = 20'
JUNEGRASS STREET
SEE SHEET 27
30 KEY MAP
30 JUNEGRASS STREET
SEE SHEET 26
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
85 55
56 57
58 95 101
81 82 83 84
85 86
87 SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
100
110
120
130
140
100
110
120
130
140
9+50 10+00 10+50 11+00 11+50 12+00 12+50
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP31.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
CONSTRUCTION NOTES CAPRI COURT (STA 10+00 - STA 12+50) IMPROVEMENT PLANS 31 SCALE:
CAPRI COURT (STA 10+00 - STA 12+50)
1" = 20'
JUNEGRASS COURT
SEE SHEET 28
31 KEY MAP
31 JUNEGRASS
STREET
SEE SHEET 27
MATCHLINE (STA 12+50)
SEE SHEET 32 MATCHLINE (STA 12+50) SEE SHEET 32
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
86 101 102 103 104 105 106
87 88 89 90 91 92 93 94
107
CAUTION EXISTING LIVE GAS LINE!!
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
100
110
120
130
140
100
110
120
130
140
12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP32.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
CAPRI COURT (STA 12+50 - STA 15+50) IMPROVEMENT PLANS
32 SCALE:
CAPRI COURT (STA 12+50 - STA 15+50)
1" = 20'
32 KEY MAP
32 EVA 3
SEE SHEET 35 MATCHLINE (STA 12+50) SEE SHEET 31
EVA 2
SEE SHEET 34 MATCHLINE (STA 12+50) SEE SHEET 31
CONSTRUCTION NOTES
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
87 ERICSON COURT
SEE SHEET 22
GOLDBACK COURT
SEE SHEET 25
150
172 195
CAUTION EXISTING LIVE GAS LINE!!
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
110
120
130
140
150
110
120
130
140
150
9+50 10+00 10+50 11+00 11+50 12+00
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP33.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40' IMPROVEMENT PLANS PARCEL F & EVA 1 (STA 9+75 - STA 11+75) 33 SCALE:
PARCEL F & EVA 1 (STA 9+75 - STA 11+75)
1" = 20'
33 KEY MAP
33 CONSTRUCTION NOTES
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
FUTURE PHASE 2
IMPROVEMENTS 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
88 JUNEGRASS COURT
SEE SHEET 28
CAPRI COURT
SEE SHEET 32
100 107
CAUTION EXISTING LIVE GAS LINE!!
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
110
120
130
140
150
110
120
130
140
150
9+50 10+00 10+50 11+00 11+50 12+00 12+50
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP34.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40' PARCEL D & EVA 2 (STA 9+75 - STA 12+00) IMPROVEMENT PLANS 34 SCALE:
PARCEL D & EVA 2 (STA 9+75 - STA 12+00)
1" = 20'
34 KEY MAP
35 CONSTRUCTION NOTES SEE SHEET 35
City of American Canyon
Public Works
Job Site Copy
06/01/2022 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
89 CAPRI COURT
SEE SHEET 32
94 CAUTION EXISTING LIVE GAS LINE!!
RIO DEL MAR
NEWELL DRIVE
RIO DEL MAR
NEWELL DRIVE WEST
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
110
120
130
140
150
110
120
130
140
150
9+50 10+00 10+50 11+00 11+50 12+00 12+50
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP35.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
20' 0' 10' 20' 40'
PARCEL D, 8IN W CONNECTION, & EVA 3 (STA 9+75 - STA 12+15) IMPROVEMENT PLANS 35 SCALE:
PARCEL D, 8IN W CONNECTION, & EVA 3 (STA 9+75 - STA 12+15) 1" = 20'
35 KEY MAP
35 CONSTRUCTION NOTES SEE SHEET 34
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
90 SD CROSSING 1
SD CROSSING 8 SD CROSSING 9 SD CROSSING 10 SD CROSSING 11 SD CROSSING 12 SD CROSSING 13 SD CROSSING 14 SD CROSSING 2 SD CROSSING 3 SD CROSSING 4 SD CROSSING 5 SD CROSSING 6 SD CROSSING 7 SD CROSSING 15 UTILITY CROSSINGS IMPROVEMENT PLANS
36 36
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP36.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
91 SD CROSSING 16 SD CROSSING 17 SD CROSSING 18 SD CROSSING 19 SD CROSSING 20 SD CROSSING 21 SD CROSSING 22 SD CROSSING 23 SD CROSSING 24 SD CROSSING 25 SD CROSSING 26 SD CROSSING 27 UTILITY CROSSINGS IMPROVEMENT PLANS 37 37
SCALE: 1" =
VERTICAL 1" =
HORIZONTAL
PROFILE
20'
4'
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP37.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
92 CARTIER STREET
20 108 PEWTER STREET
CARTIER
STREET DATURA STREET
CARTIER
COURT
124
125
CARTIER
COURT
128 PEWTER STREET
ERICSON
STREET
23 129
151
24 25 PEWTER STREET
ERICSON
STREET ERICSON
COURT DATURA STREET DATURA STREET
145 146
168 167
ERICSON
COURT
150
PARCEL E
(EVA) CURB RAMP DETAILS IMPROVEMENT PLANS
38 38
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP38.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 CURB RAMPS 1-2
CURB RAMPS 3-4
CURB RAMP 5
CURB RAMPS 6-8
CURB RAMPS 9 -12
CURB RAMP 13
GRAPHIC SCALE
10' 0' 5' 10' 20'
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
93 STREET PEWTER
GOLDBACK
COURT
PEWTER STREET
GOLDBACK
COURT
GOLDBACK
STREET DATURA STREET
GOLDBACK
COURT
PEWTER STREET
PEWTER STREET
JUNEGRASS
STREET
PEWTER COURT
JUNEGRASS STREET COURT G
JUNEGRASS
STREET COURT H CURB RAMP DETAILS IMPROVEMENT PLANS
39 39
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP39.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 CURB RAMPS 14-15
CURB RAMPS 16-19
CURB RAMP 20
CURB RAMPS 21-22
CURB RAMPS 23-24
CURB RAMPS 25-26
CURB RAMPS 27-28
GRAPHIC SCALE
10' 0' 5' 10' 20'
08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024 94 JUNEGRASS
STREET DATURA STREET
JUNEGRASS
STREET
JUNEGRASS
COURT CAPRI COURT
PARCEL D (EVA)
62 JUNEGRASS
COURT
PARCEL D (EVA)
PARCEL D (EVA)
CAPRI
COURT
CARTIER CURB RAMP DETAILS IMPROVEMENT PLANS
40 40
JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\IP40.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 CURB RAMPS 29-32
CURB RAMPS 33-34
CURB RAMP 35 CURB RAMP 36
GRAPHIC SCALE
10' 0' 5' 10' 20'
CURB RAMP 37 CURB RAMP 38
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
95 CITY DETAILS (NOT LIMITED TO)
IMPROVEMENT PLANS 41 41JOB NUMBER SHEET NUMBER OF 1217-062
CITY OF AMERICAN CANYON CALIFORNIA
LOT 10 AT WATSON RANCH
DRAWN BY:
DATE:
JH
PROJ. ENGR:
PROJ. MGR:
WPC
MAY 3, 2022
AVG G:\1217-062\ACAD\IP\IP41.DWG
CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456 47 City of American Canyon
Public Works
Job Site Copy
06/01/2022
08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
96 CITY DETAILS (NOT LIMITED TO)
IMPROVEMENT PLANS 42 42JOB NUMBER SHEET NUMBER OF 1217-062
CITY OF AMERICAN CANYON CALIFORNIA
LOT 10 AT WATSON RANCH
DRAWN BY:
DATE:
JH
PROJ. ENGR:
PROJ. MGR:
WPC
MAY 3, 2022
AVG G:\1217-062\ACAD\IP\IP42.DWG
CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456 47 City of American Canyon
Public Works
Job Site Copy
06/01/2022
08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
97 CITY DETAILS (NOT LIMITED TO)
IMPROVEMENT PLANS 43 43JOB NUMBER SHEET NUMBER OF 1217-062
CITY OF AMERICAN CANYON CALIFORNIA
LOT 10 AT WATSON RANCH
DRAWN BY:
DATE:
JH
PROJ. ENGR:
PROJ. MGR:
WPC
MAY 3, 2022
AVG G:\1217-062\ACAD\IP\IP43.DWG
CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456 47
City of American Canyon
Public Works
Job Site Copy
06/01/2022
08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
98 CITY DETAILS (NOT LIMITED TO)
IMPROVEMENT PLANS 44 44JOB NUMBER SHEET NUMBER OF 1217-062
CITY OF AMERICAN CANYON CALIFORNIA
LOT 10 AT WATSON RANCH
DRAWN BY:
DATE:
JH
PROJ. ENGR:
PROJ. MGR:
WPC
MAY 3, 2022
AVG G:\1217-062\ACAD\IP\IP44.DWG
CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456 47
City of American Canyon
Public Works
Job Site Copy
06/01/2022
08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
99 CITY DETAILS (NOT LIMITED TO)
IMPROVEMENT PLANS 45 45JOB NUMBER SHEET NUMBER OF 1217-062
CITY OF AMERICAN CANYON CALIFORNIA
LOT 10 AT WATSON RANCH
DRAWN BY:
DATE:
JH
PROJ. ENGR:
PROJ. MGR:
WPC
MAY 3, 2022
AVG G:\1217-062\ACAD\IP\IP45.DWG
CIVIL ENGINEERS SURVEYORS PLANNERS
SAN RAMON
WWW.CBANDG.COM
ROSEVILLE
(925) 866-0322
(916) 788-4456 47 City of American Canyon
Public Works
Job Site Copy
06/01/2022
08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023
PHASE 1 RECORD DRAWINGSSEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:CARTIER STREET: SHEET 12 (STA: 12+84.88)DATURA STREET: SHEET 15 (STA: 11+82.55)ERICSON STREET: SHEET 20 (STA: 10+46.95)GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) PHASE 1 RECORD DRAWINGSSEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT,CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
100
RIO DEL MAR
ROLLING HILLS DRIVE
LOOP ROAD
RIO DEL MAR
CARTIER STREET
ERICSON STREET
GOLDBACK STREET
JUNEGRASS STREET PEWTER STREET PEWTER COURT DATURA STREET CAPRI COURT LOOP ROADDATURA STREET
JUNEGRASS COURT
GOLDBACK COURT
ERICSON COURT
RIO DEL MAR
CARTIER COURT 123456789
10 11
12 13
14 15
16 17
18 38
37 36
35 34
33 32
31 30
29 28
27 26
25 24
23 22
21 20
108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
65 66
67 68
69 70
71 72
73 74
75 76
77 78
79 80
81 82
83 84
85 86
87 88
89 90
91 92
93 94
95 96 97 98 99 100
101 102 103 104 105
106 107
19 PARCEL C BALSA COURT BRISA COURT FIRE WATER PLAN IMPROVEMENT PLANS FS-1
46 JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\FS-1.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 GRAPHIC SCALE
80' 0' 40' 80' 160'
LEGEND
EXISTING PROPOSED DESCRIPTION
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
101
RIO DEL MAR
ROLLING HILLS DRIVE
LOOP ROAD RIO DEL MAR LOOP ROAD RIO DEL MAR
PARCEL C 123456789
10 11
12 13
14 15
16 17
18 38
37 36
35 34
33 32
31 30
29 28
27 26
25 24
23 22
21 20
108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
65 66
67 68
69 70
71 72
73 74
75 76
77 78
79 80
81 82
83 84
85 86
87 88
89 90
91 92
93 94
95 96 97 98 99
100
101 102
103 104 105
106 107
19 CARTIER STREET
ERICSON STREET
GOLDBACK STREET
JUNEGRASS STREET PEWTER STREET PEWTER COURT DATURA STREET CAPRI COURT DATURA STREET
JUNEGRASS COURT
GOLDBACK COURT
ERICSON COURT
CARTIER COURT BALSA COURT BRISA COURT
LEGEND
GRAPHIC SCALE
80' 0' 40' 80' 160' FIRE ACCESS PLAN IMPROVEMENT PLANS
FS-2
47 JOB NUMBER
SHEET NUMBER
OF
1217-062 CITY OF AMERICAN CANYON CALIFORNIA LOT 10 AT WATSON RANCH DRAWN BY: DATE: JH PROJ. ENGR: PROJ. MGR: WPC MAY 3, 2022 AVG G:\1217-062\ACAD\IP\FS-2.DWG CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 47 FIRE TRUCK TURNING TEMPLATE
08/01/2023
PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30) 08/01/2023 PHASE 1 RECORD DRAWINGS
SEE PHASE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARTIER STREET: SHEET 12 (STA: 12+84.88)
DATURA STREET: SHEET 15 (STA: 11+82.55)
ERICSON STREET: SHEET 20 (STA: 10+46.95)
GOLDBACK STREET: SHEET 23 (STA: 10+45.49 & 10+66.30)
PHASE 1 RECORD DRAWINGS
SEE PHAE 1 LIMITS ON PLAN & PROFILE SHEETS:
CARITER STREET: SHEET 12 (STA: 10+00 - 12+84.88)
DATURA STREET: SHEET 15 (STA 10+00 - 11+82.55)
ERICSON STREET: SHEET 20 (STA 10+00 - 10+46.95)
GOLDBACK STREET: SHEET 23 (STA 10+00 - 10+45.49 & 10+66.30)
PEWTER STREET, PEWTER COURT, JUNEGRASS STREET, JUNEGRASS COURT, CAPRI COURT, BALSA COURT, BRISA COURT 01/29/2024
102
Watson Ranch; D.R. Horton Lot 10
Corrective Action / Punch List Report
01-30-2024
Punch List Items
Item # Category Description Date Created Completed Days to Resolution
Attached
Files
( before /
after )
Attached
Photos
( before /
after )
Urgency
13 Storm Drain CB 16 to SDMH 3 Oct 17 2022 11:44 am [ ] 470 0/0 0/0 Level 1 35 Concrete Sidewalk Goldback st. Sta. 10+50 Jun 13 2023 12:55 pm [ ] 231 0/0 3/0 Level 1 48 Water, Domestic Cathodic protection Domestic water
valve
Dec 06 2023 11:41 am [ ] 55 0/0 1/0 Level 1
50 Water, Domestic Lot #126 water service damaged Dec 06 2023 11:54 am [ ] 55 0/0 0/0 Level 1 51 Water, Domestic Lot #147 service lateral was
damaged
Dec 06 2023 03:33 pm [ ] 55 0/0 1/0 Level 1
52 Striping/Legends thermo plastic paint for roadway
stiping
Jan 04 2024 03:30 pm [ ] 26 0/0 0/0 Level 1
53 Asphalt distressed asphalt Cartier @ Pewter Jan 04 2024 03:32 pm [ ] 26 0/0 2/0 Level 1 54 Asphalt Distressed asphalt Pewter st. Jan 04 2024 03:34 pm [ ] 26 0/0 2/0 Level 1 55 Asphalt Damaged asphalt Junegrass
sta.12+30 lt cl
Jan 04 2024 03:37 pm [ ] 26 0/0 1/0 Level 1
56 Asphalt Damaged asphalt Junegrass
sta.12+30 lt cl
Jan 04 2024 03:37 pm [ ] 26 0/0 0/0 Level 1
58 Asphalt Capri ct asphalt damaged Jan 04 2024 03:41 pm [ ] 26 0/0 1/0 Level 1 59 Asphalt Capri ct. asphalt damaged Jan 04 2024 03:42 pm [ ] 26 0/0 1/0 Level 1 62 Water, Domestic Lot 94 meter lid is damaged Jan 04 2024 03:47 pm [ ] 26 0/0 0/0 Level 1 103
Item # Category Description Date Created Completed Days to Res Att Files Att Photos Urgency 66 Asphalt Capri ct. adjacent to #43 Capri ct.
asphalt damaged
Jan 04 2024 04:07 pm [ ] 26 0/0 0/0 Level 1
67 Concrete 55 Capri ct. chipped curb Jan 04 2024 04:09 pm [ ] 26 0/0 0/0 Level 1 68 Asphalt Capri ct lot 85 Jan 04 2024 04:11 pm [ ] 26 0/0 0/0 Level 1 69 Concrete Capri ct. lot 84 Jan 04 2024 04:12 pm [ ] 26 0/0 0/0 Level 1 70 Concrete Capri ct lot s 84 and 83 Jan 04 2024 04:15 pm [ ] 26 0/0 0/0 Level 1 71 Concrete Capri ct. concrete cracked Jan 04 2024 04:17 pm [ ] 26 0/0 0/0 Level 1 72 Sewer collar for sewer clean out lot 81
(model parking)
Jan 04 2024 04:18 pm [ ] 26 0/0 0/0 Level 1
73 Concrete Capri ct. lot 95, sidewalk and
curb/gutter
Jan 04 2024 04:21 pm [ ] 26 0/0 0/0 Level 1
74 Concrete Capri ct. west side of lot 101 concrete
cracking
Jan 04 2024 04:22 pm [ ] 26 0/0 0/0 Level 1
79 Concrete Pewter st. , street light apron
damaged
Jan 04 2024 04:31 pm [ ] 26 0/0 1/0 Level 1
104
CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
CONSENT
ITEM NUMBER: 13.
TITLE
Cerficaon of Sufficiency of Measure "K" Iniave Peon - An Iniave Measure Establishing a Ministerial Permi1ng Process for Development of Certain Warehouse Facilies by Amending the City of American Canyon Municipal Code
RECOMMENDATION
Adopt a Resoluon of the City Council of the City of American Canyon accepng the cerficaon of the Napa County Clerk Ex-Officio Registrar of Voters as to the sufficiency of the iniave peon entled "An Iniave Measure Establishing a Ministerial Permi1ng Process for Development of Certain Warehouse Facilities by Amending the City of American Canyon Municipal Code".
CONTACT
Taresa Geilfuss, CMC, City Clerk
William D. Ross, City Attorney
BACKGROUND & ANALYSIS
On October 20, 2023, American Canyon registered voter Francis Lemos submi:ed a "noce of intenon" to circulate a peon for an ordinance iniave entled "An Iniave Measure Establishing a Ministerial Perming Process for Development of Certain Warehouse Facilies by Amending the City of American Canyon Municipal Code" (Attachment 1A).
Therea>er, the City A:orney prepared and provided an official "ballot tle and summary" for the proposed iniave for use by the proponents for publicaon and circulaon of the peon (see section below).
The following is the full text of the Ballot Title and Summary which was prepared by the City A'orney and Published and Circulated by the Proponents during their collection of signatures:
Ballot Title and Summary
This Iniave Measure would establish by amendment to the City of American Canyon (City) Municipal Code, a ministerial, nondiscreonary permi1ng process to incenvize development of sustainable, energy-efficient warehouse facilities (Projects). 105
To qualify as a sustainable, energy-efficient Project, the following would need to be determined by the City Community Development Director:
1) Compliance with landscape, site design, and design guidelines that promote "green building" design, water conservaon, and energy conservaon, including affordable and economic passive solar technology; and
2) Migaon of significant impacts on the environment, including emissions of greenhouse gases and vehicle miles traveled, through implementaon of feasible mitigation measures and use of renewable energy sources; and 3) Preservation of biologically sensitive on-site areas as open space where feasible.
The Iniave Measure indicates that a Project would not require review under the California Environmental Quality Act because it establishes a ministerial review and permi1ng process for Projects. Projects would be exempt from design review under the City Municipal Code. Objective standard conditions of approval may be imposed.
Ministerial approval does not preclude imposion of standard condions of approval for lighng, air quality, wildlife (a>er biological studies of impacts on Swainson’s Hawk, Golden Eagle, Northern harrier, short-eared owl and burrowing owl), wetlands (there shall be no net-loss of wetlands), cultural resources (a>er assessment of Archeologists, Coroner/Medical Examiner and the Nave American Heritage Commission), geology, greenhouse gas emissions (including best management pracces), stormwater, noise, and landscaping.
The Iniave Measure establishes minimum standards and protecons for design and appearance, sustainability including stormwater and drainage, collecon of recyclable materials, waste management, tobacco smoke control, light polluon reducon, water efficiencies, low volale organic compounds, structuring, electric vehicle charging staons, bicycle parking, preservaon of open space and wetlands, and greenhouse gas emissions and energy.
The Iniave Measure also provides current detailed requirements for building and safety, fire protecon, and public works. Prior to issuance of certain permits and cerficates of occupancy, the developer will be required to submit documentaon to confirm specific conditions have been met.
If the Iniave Measure receives 10% of valid registered voter signatures, it would be forwarded to the City Council for adopon or placement on the ballot at a date to be determined. If approved, the Iniave Measure will become effecve at the earliest date authorized by law.
106
The Iniave Measure indicates that it may not be amended or repealed unl January 1, 2029, after that it may be amended or repealed by a majority vote of the City Council.
Sufficiency of Petition
On January 4, 2024, proponents filed the circulated and signed peon with City Clerk. Following a review by the City Clerk and City A:orney, the peon was delivered to the Napa County Clerk ExOfficio Registrar of Voters for signature verificaon. On January 12, 2024, the Napa County Clerk ExOfficio Registrar of Voters returned a Certificate of Sufficiency (Attachment 1B).
Certification of Sufficiency
The Elecons Official shall cerfy the results of the examinaon to the City Council (California Elections Code sections 9211 and 9114-9115).
Staff recommends the City Council accept the cerficaon of the Napa County Clerk Ex-Officio Registrar of Voters as to the sufficiency of the initiative petition.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Organizational Effectiveness: "Deliver exemplary government services."
FISCAL IMPACT
Not applicable.
ENVIRONMENTAL REVIEW
Not applicable.
ATTACHMENTS:
1. Resolution - Accepting Sufficiency of Initiative Petition
2. Exhibit A - Initiative Petition
3. Exhibit B - Clerk's Certificate to Initiative Petition 107
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON,
CALIFORNIA, ACCEPTING THE CERTIFICATION OF THE NAPA COUNTY REGISTRAR OF VOTERS AS TO SUFFICIENCY OF THE INITIATIVE PETITION ENTITLED “AN
INITIATIVE MEASURE ESTABLISHING A MINISTERIAL PERMITTING PROCESS FOR
DEVELOPMENT OF CERTAIN WAREHOUSE FACILITIES BY AMENDING THE CITY OF AMERICAN CANYON MUNICIPAL CODE”
WHEREAS, on October 20, 2023, proponents of an initiative measure entitled “An Initiative Measure Establishing a Ministerial Permitting Process for Development of Certain Warehouse Facilities by Amending the City of American Canyon Municipal Code” submitted a Notice of Intention and written text of the measure and requested that a title and summary be prepared by the City Attorney for the measure to circulate the petition; and
WHEREAS, on November 6, 2023, the City Attorney prepared and provided an official ballot title and summary for the proposed Initiative for use by the proponents for publication and circulation of the petition; and
WHEREAS, the City Clerk contacted the Napa County Clerk Ex-Officio Registrar of Voters’ Office to determine the number of registered voters in the City of American Canyon, as of its last report to the Secretary of State pursuant to Elections Code Section 2187, and the City Clerk determined that the number of registered voters in the City was 13,232; and WHEREAS, the initiative petition would require at least 1,323 (10%) valid signatures to be sufficient to qualify for either: City Council approval or placement of the matter before voters at a regular or special election; and
WHEREAS, the petitions regarding the initiative were filed with the City Clerk on December 21, 2023, and were then submitted to the Napa County Clerk Ex-Officio Registrar of Voters on January 4, 2024, for signature verification; and
WHEREAS, the results of the signature verification conducted by the Napa County Clerk Ex-Officio Registrar of Voters, which is done by revieing a portion of the signatures, established that 500 of the 1,850 signatures on the petition were examined of which 443 were found to be sufficient; and WHEREAS, the number of signatures qualified, 1,609, is in excess of the minimum number of signatures required for a regular or special election pursuant to Election Code sections 9215 and 1405; and WHEREAS, the Napa County Clerk Ex-Officio Registrar of Voters has prepared the Certificate of Sufficiency of the Initiative Petition attached as Exhibit “A”; and 108
WHEREAS, Elections Code Section 9114 and 9211 requires that the voter initiative petitions be submitted to the City Council at the next regular City Council (County) meeting following the certification.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of American Canyon hereby accepts and confirms the Certificate of Sufficiency regarding the initiative petition.
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Leon Garcia, Mayor
ATTEST: APPROVE AS TO FORM:
____________________________ _____________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
PUBLIC HEARING
ITEM NUMBER: 14.
TITLE
Ordinances Establishing Industrial Use Sustainability Standards and Greenhouse Gas Emissions Standards.
RECOMMENDATION
Waive first reading, read by title only, and adopt the following:
1. An Ordinance of the City Council of the City of American Canyon, State of California, adop2ng an Ordinance to implement Industrial Use Greenhouse Gas Standards; and
2. An Ordinance of the City Council of the City of American Canyon, State of California, adop2ng an Ordinance to implement Industrial Commerce Centers Sustainability Standards.
CONTACT
William Ross, City Attorney
BACKGROUND & ANALYSIS
Implementing Industrial Use Green House Gas Standards
California has established the goal of carbon neutrality by 2045, which will require significant reduc2ons and mi2ga2on of greenhouse gas (“GHG”) emissions. Industrial land uses like freight, warehouse, and logis2cs centers o<en emit substan2al GHG emissions and present some of the best and most efficient opportuni2es to reduce and mi2gate GHG emissions. The City of American Canyon (“City”) seeks to be an environmental leader by a>rac2ng industrial development that meets the highest standards of environmental sustainability.
The California Environmental Quality Act (Pub. Res. Code § 21000 et seq., “CEQA”) requires lead agencies to choose a threshold of significance to evaluate greenhouse gas emissions that is supported by substan2al evidence and captures all significant impacts which may be one developed by an expert agency.
141
The City falls within the Bay Area Air Quality Management District (“BAAQMD”), which in 2022 issued GHG significance thresholds recommenda2ons for residen2al and commercial projects, but did not recommend a threshold for industrial land uses. The South Coast Air Quality Management District (“SCAQMD”), which includes Los Angeles County, has developed a threshold of significance under CEQA for industrial land uses that is supported by substan2al evidence and serves as a basis for mitigation of significant sources of GHG impacts.
Adop2ng a threshold of significance that combines BAAQMD’s baseline threshold with the SCAQMD’s threshold will capture the main sources of GHG emissions from industrial land uses.
The proposed threshold standards would be applied in a tiered evaluation system:
Tier 1: CEQA Categorical Exemptions
Ini2ally, determine if the project qualifies for any CEQA categorical exemp2ons. If it does not, proceed to Tier 2.
Tier 2: Consistency with Local GHG Reduction Plans
Assess if the project aligns with a locally adopted GHG reduc2on plan. This plan must have undergone public hearing and CEQA review, have an approved inventory, and include monitoring. If the project is not consistent with such a plan, move to Tier 3.
Tier 3: Project Design Elements
Evaluate the project against specific design elements:
1. Buildings: a. The project should not include natural gas appliances or plumbing. b. The project should avoid wasteful or unnecessary energy use, as per CEQA guidelines.
2. Transportation: a. The project must achieve a reduc2on in vehicle miles traveled (VMT) below the regional average, currently at least 15% as per the California Climate Change Scoping Plan. b. The project must comply with the latest CALGreen Tier 2 electric vehicle requirements.
If the project does not incorporate these design elements, it is considered to have a significant GHG impact. If it does, move to Tier 4.
Tier 4: GHG Emissions Screening Threshold
Determine if the project's GHG emissions exceed the South Coast Air Quality Management District’s threshold of 10,000 metric tons of CO2 equivalent (MT CO2e) per year for industrial uses and sta2onary projects. Projects exceeding this threshold are deemed to have a significant GHG impact.
142
Implementing Industrial Commerce Centers Sustainability Standards Warehousing, logis2cs and distribu2on facili2es are well-documented sources of air quality degrada2on that can create serious, nega2ve health outcomes for surrounding communi2es; and these projects substan2ally increase air quality emissions through construc2on, opera2on, and vehicle-related emissions.
The City seeks to be an environmental leader by a>rac2ng industrial development that meets the highest standards of environmental sustainability.
The proposed Ordinance applying Industrial Commerce Center Sustainability Standardsapplies to warehousing, logis2cs and distribu2on facili2es in the City for which a No2ce of Prepara2on is issued a<er March 1, 2024 under CEQA. The Ordinance would apply zero or low emissions standards to various aspects of industrial commerce center(s), including zero-emission equipment, roo<op solar panels, and environmental compliance measures aimed at mi2ga2ng air quality degradation.
The proposed Ordinance established the following standards to all warehousing, logis2cs, and distribu2on facili2es in the City where a No2ce of Prepara2on is issued a<er March 1, 2024, under the California Environmental Quality Act (CEQA).It defines such facili2es as those used for storing and consolida2ng manufactured goods, typically larger than 200,000 square feet with specific characteristics such as dock high loading doors and truck activities.
The following standards are applicable under the proposed Ordinance:
1. Zero Emission Opera2onal Equipment: All on-site motorized opera2onal equipment (forkli<s, yard trucks, pallet jacks, etc.) must be zero-emission. This includes using electrical hookups instead of diesel-fueled generators for construction tools.
2. Zero Emission Cargo Handling Equipment: All outdoor cargo handling equipment must be zero-emission vehicles. Necessary charging sta2ons or infrastructure for these vehicles must be included in each building.
3. Roo4op Solar Panels: Before issuing a business license, the City will ensure that roo<op solar panels are installed to supply 100% of the power needed for non-refrigerated parts of the facility, including parking areas.
4. Refrigerated Space Requirements: Facili2es not commiKng to non-refrigerated use must install conduits during construc2on for poten2al refrigerated spaces. Electric plug-in units for refrigeration units must be installed at relevant dock doors.
5. Zero Emission Construction Equipment: All generators and diesel-fueled off-road construction equipment over 75 horsepower must be zero-emissions or have CARB Tier IV-compliant 143
engines. Exemptions are possible if such equipment is not reasonably available.
6. Electric Vehicle Charging Sta2ons: Install infrastructure for Level 2 (or faster) EV charging stations for a percentage of employee parking spaces, increasing to 25% by 2030.
7. Air Filtra2on Systems: Install HVAC and/or HEPA air filtra2on systems in all warehouse facilities.
The Planning Commission at its January 25, 2024 mee2ng approved Resolu2ons recommending the City Council adopt the Proposed Ordinances. The Planning Commission Staff Report is available for review at: Planning Commission Staff Report.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Infrastructure: "Develop and maintain infrastructure resources to support sustainable growth."
FISCAL IMPACT
N/A
ENVIRONMENTAL REVIEW
Adop2ng the Ordinances are exempt from the California Environmental Quality Act (CEQA), as it is not a Project under CEQA Guidelines Sec2on 15378(b), and is categorically exempt under CEQA Guidelines Section 15308 “Actions by Regulatory Agencies for Protection of the Environment.” ATTACHMENTS:
Exh. 1 - Ordinance No. 2024- GHG (Final)
Exh. 2 - Ordinance No. 2024- Industrial Standards (Final) 144
ORDINANCE NO. 2024-____
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON, STATE OF
CALIFORNIA, ADOPTING INDUSTRIAL USE GREENHOUSE GAS STANDARDS WHEREAS, California has established the ambitious goal of carbon neutrality by 2045, which will require significant reductions and mitigation of greenhouse gas (“GHG”) emissions; and WHEREAS, industrial land uses like freight, warehouse, and logistics centers often emit substantial GHG emissions in their construction and operation, especially due to heavy-duty truck traffic; and WHEREAS, new developments and land use proposals present some of the best and most efficient opportunities to reduce and mitigate GHG emissions; and WHEREAS, mitigation of GHG emissions from individual projects often reduces co-emitted air pollutants, with advantages for nearby air quality and human health; and WHEREAS, the City of American Canyon (“City”) seeks to be an environmental leader by attracting industrial development that meets the highest standards of environmental sustainability; and WHEREAS, the California Environmental Quality Act (Pub. Res. Code § 21000 et sea., “CEQA”) requires lead agencies to choose a threshold of significance to evaluate greenhouse gas emissions; lead agencies must choose a threshold that is supported by substantial evidence and captures all significant impacts; and lead agencies have the discretion to create their own threshold or adopt one developed by an expert agency; and
WHEREAS, in 2022 the Bay Area Air Quality Management District (“BAAQMD”) issued guidance recommending GHG significance thresholds of general applicability for residential and commercial projects; but did not recommend a threshold for industrial land uses; and WHEREAS, BAAQMD’s thresholds for residential and commercial projects are insufficient for industrial land uses because they do not capture or consider the significant sources of GHG emissions from industrial land uses; and
WHEREAS, until BAAQMD develops a GHG threshold appropriate for industrial uses, the City will adopt its own threshold standards relying on the analysis and implement record of other rulemaking actions of other local agencies to determine a threshold of applicability to industrial land uses; and
WHEREAS, the South Coast Air Quality Management District (“SCAQMD”) has developed a threshold of significance for industrial land uses that is supported by substantial evidence and captures the significant sources of GHG impacts; and
WHEREAS, a threshold of significance that combines BAAQMD’s baseline threshold with the SCAQMD’s threshold will capture the presently known GHG emissions from industrial land uses; and
145
WHEREAS, a duly-noticed public hearing was held by the City of American Canyon Planning Commission on January 25, 2024 on the subject ordinance, and recommends City Council approval; and
WHEREAS, a duly-noticed public hearing was held by the City of American Canyon City Council on February 6, 2024 on the subject ordinance, at which time all those in attendance were given the opportunity to speak on this proposal and to submit comments.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON DOES HEREBY ORDAIN THAT SECTION 19.01.061 IS HEREBY ADDED TO THE MUNICIPAL CODE OF THE CITY OF AMERICAN CANYON AS FOLLOWS:
19.01.061 Industrial Use Greenhouse Gas Standards
(A) Every Industrial Use Land Use Proposal for which the City of American Canyon is the Lead Agency shall use the following threshold to evaluate the significance of greenhouse gas (GHG) impact under the California Environmental Quality Act (CEQA):
(1) TIER 1. Determine if CEQA categorical exemptions are applicable. If not, move to Tier 2. (2) Tier 2. Consider whether the proposed project is consistent with a locally adopted GHG reduction plan that has gone through public hearing and CEQA review, that has an approved inventory, includes monitoring, etc. If not, move to Tier 3. (3) Tier 3. Consider whether the project includes, at a minimum, the following project design elements:
1. Buildings
a. The project will not include natural gas appliances or natural gas plumbing (in both residential and nonresidential development).
b. The project will not result in any wasteful, inefficient, or unnecessary energy use as determined by the analysis required under CEQA Section 21100(b)(3) and Section 15126.2(b) of the State CEQA Guidelines.
2. Transportation
a. The project will achieve a reduction in project-generated vehicle miles traveled (“VMT”) below the regional average consistent with the current version of the California Climate Change Scoping Plan (currently 15 percent). b. The project will achieve compliance with off-street electric vehicle requirements in the most recently adopted version of CALGreen Tier 2. If the project does not include the above project design elements, the Project has a significant GHG impact. If it does include the above project design elements, move to Tier 4.
146
(4) Tier 4. Consider whether the project generates GHG emissions in excess of the South Coast Air Quality Management District’s 10,000 MT CO2e per year screening threshold for industrial uses and stationary projects. If so, the project has a significant GHG impact.
SECTION 1. CEQA FINDINGS. The City Council finds the municipal code amendments are exempt from environmental review under CEQA as it is not a Project under CEQA Guidelines Section 15378(b) and is categorically exempt under CEQA Guidelines Section 15308 “Actions by Regulatory Agencies for Protection of the Environment and a Notice of Exemption has been prepared for this proposed amendment.
SECTION 2. EFFECTIVE DATE. This ordinance shall become effective effect 30 days after its final passage pursuant to Government Code section 36937.
SECTION 3. SEVERABILITY. If any section, sentence, clause or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance and adopted this Ordinance and each section, sentence, clause or phrase thereof, irrespective of the fact that one or more sections, subsections, sentences, clauses or phrases be declared invalid or unconstitutional.
SECTION 4. CUSTODIAN OF RECORDS. The documents and materials that constitute the record of proceedings on which this Ordinance is based are located at the City Clerk’s office located at 4831 Broadway, Suite 201, American Canyon, CA 94503. The custodian of these records is the City Clerk.
The foregoing Ordinance was introduced at a Regular Meeting of the City Council of the City of American Canyon, State of California, held on the 6th day of February, 2024, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
The foregoing Ordinance was adopted at a regular meeting of the City Council of the City of American Canyon, State of California, held on the _________ day of ____________, ______, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
_____________________________
Leon Garcia, Mayor
147
ATTEST: APPROVED AS TO FORM:
_______________________________ ___________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 148
ORDINANCE NO. 2024-____
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON, STATE OF
CALIFORNIA, ADOPTING AN ORDINANCE TO IMPLEMENT INDUSTRIAL COMMERCE CENTERS
SUSTAINABILITY STANDARDS
WHEREAS, California has established the ambitious goal of carbon neutrality by 2045, which will require significant reductions and mitigation of greenhouse gas (“GHG”) emissions; and WHEREAS, warehousing, logistics and distribution facilities are well-documented sources of air quality degradation that can create serious, negative health outcomes for surrounding communities; and these projects substantially increase air quality emissions through construction, operation, and vehicle-related emissions; and
WHEREAS, new developments and land use proposals present some of the best and most efficient opportunities to reduce and mitigate GHG emissions and air pollutants; and WHEREAS, the City of American Canyon (“City”) seeks to be an environmental leader by attracting industrial development that meets the highest standards of environmental sustainability; and WHEREAS, the municipal code amendments are exempt from the California Environmental Quality Act (CEQA), as it is not a Project under CEQA Guidelines Section 15378(b), and is categorically exempt under CEQA Guidelines Section 15308 “Actions by Regulatory Agencies for Protection of the Environment; and
WHEREAS, a duly-noticed public hearing was held by the City of American Canyon Planning Commission on January 25, 2024 on the subject ordinance, and recommends City Council approval; and
WHEREAS, a duly-noticed public hearing was held by the City of American Canyon City Council on February 6, 2024 on the subject ordinance, at which time all those in attendance were given the opportunity to speak on this proposal and to submit comments.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON DOES HEREBY ORDAIN THAT CHAPTER 19.09 - INDUSTRIAL COMMERCE CENTERS SUSTAINABILITY STANDARDS IS HEREBY ADDED TO THE MUNICIPAL CODE OF THE CITY OF AMERICAN CANYON AS FOLLOWS:
Chapter 19.09 – Industrial Commerce Centers Sustainability Standards Sec. 19.09.010 – Applicability.
This Article is applicable to all warehousing, logistics and distribution facilities throughout the city for which a Notice of Preparation is issued after March 1, 2024 under the implementing Guidelines of the California Environmental Quality Act (CEQA).
A warehousing, logistics or distribution facility means facilities used for the storage and/or consolidation of manufactured goods (and to a lesser extent, raw materials and excludes bulk storage of materials, which are flammable or explosive or create hazardous or 149
commonly recognized offensive conditions) before their distribution to retail locations or other warehouses. The facilities are generally greater than 200,000 square feet in size, with a land coverage ratio of approximately 50 to 80 percent, and a dock-high loading door ratio of approximately 1:5,000—8,000 square feet. They are characterized by dock high loading doors, could be on opposing sides of the building (cross dock facility); significant movement and storage of products, materials, or equipment; truck activities frequently outside of the peak hour of the adjacent street system; and freeway access, including:
• Freight yards/forwarding terminals
• Warehousing distribution/high cube distribution centers • Moving agencies
• Parcel delivery terminals
• Railroad freight stations
• Shipping/receiving yards
• Truck terminals
The following sections shall supersede any existing requirements in the Municipal Code and Specific Plans.
Sec. 19.09.020 – Requirements for warehousing, logistics or distribution facilities for which a Notice of Preparation is issued after March 1, 2024 under CEQA.
1. On-site motorized operational equipment, including but not limited to forklifts, yard trucks, and pallet jacks, shall be ZE (zero emission). This includes electrical hook ups to the power grid, rather than diesel-fueled generators, for contractors’ electric construction tools, such as saws, drills and compressors.
2. All outdoor cargo handling equipment (including yard trucks, hostlers, yard goats, pallet jacks, forklifts, and landscaping equipment) shall be zero-emission vehicles.
Each building shall include the necessary charging stations or other necessary infrastructure for zero-emission cargo handling equipment.
3. Prior to issuance of a business license, the City shall ensure rooftop solar panels are installed and can be operated in such a manner that they will supply 100% of the power needed to operate all non-refrigerated portions of the facility including the parking areas.
4. Unless the owner of the facility records a covenant on the title of the underlying property ensuring that the property cannot be used to provide chilled, cooled, or freezer warehouse space, a conduit shall be installed during construction of the building shell from the electrical room to 100% of the loading dock doors that have potential to serve the refrigerated space. When tenant improvement building permits are issued for any refrigerated warehouse space, electric plug-in units shall be installed at every dock door servicing the refrigerated space to allow transport refrigeration units (TRUs) to plug in. Truck operators with TRUs shall be required to utilize electric plug-in units when at loading docks. 150
5. All generators, and all diesel-fueled off-road construction equipment greater than 75 horsepower, will be zero-emissions or equipped with CARB Tier IV-compliant engines (as set forth in Section 2423 of Title 13 of the California Code of Regulations, and Part 89 of Title 40 of the Code of Federal Regulations) or better by including this requirement in applicable bid documents, purchase orders, and contracts with successful contractors. After either (1) the completion of grading or, (2) the completion of an electrical hookup at the site, whichever is first, require all generators and all diesel-fueled off-road construction equipment, to be zero-emissions or equipped with CARB Tier IV-compliant engines (as set forth in Section 2423 of Title 13 of the California Code of Regulations, and Part 89 of Title 40 of the Code of Federal Regulations) or better by including this requirement in applicable bid documents, purchase orders, and contracts with successful contractors. An exemption from these requirements may be granted by the City in the event that the applicant documents that equipment with the required tier is not reasonably available and corresponding reductions in criteria air pollutant emissions are achieved from other construction equipment.
6. Prior to certificate of occupancy, install conduit and infrastructure for Level 2 (or faster) electric vehicle charging stations on-site for employees for the percentage of employee parking spaces commensurate with Title 24 requirements in effect at the time of building permit issuance plus additional charging stations equal to 5% of the total employee parking spaces in the building permit, whichever is greater. By 2030 install Level 2 (or faster) electric vehicle charging stations for 25% of the employee parking spaces required.
7. Install HVAC and/or HEPA air filtration systems in all warehouse facilities.
SECTION 1. CEQA FINDINGS. The City Council finds the municipal code amendments are exempt from environmental review under CEQA as it is not a Project under CEQA Guidelines Section 15378(b) and is categorically exempt under CEQA Guidelines Section 15308 “Actions by Regulatory Agencies for Protection of the Environment and a Notice of Exemption has been prepared for this proposed amendment.
SECTION 2. EFFECTIVE DATE. This ordinance shall become effective effect 30 days after its final passage pursuant to Government Code section 36937.
SECTION 3. SEVERABILITY. If any section, sentence, clause or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance and adopted this Ordinance and each section, sentence, clause or phrase thereof, irrespective of the fact that one or more sections, subsections, sentences, clauses or phrases be declared invalid or unconstitutional.
SECTION 4. CUSTODIAN OF RECORDS. The documents and materials that constitute the record of proceedings on which this Ordinance is based are located at the City Clerk’s office located at 4831 Broadway, Suite 201, American Canyon, CA 94503. The custodian of these records is the City Clerk.
151
The foregoing Ordinance was introduced at a Regular Meeting of the City Council of the City of American Canyon, State of California, held on the 6th day of February, 2024, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
The foregoing Ordinance was adopted at a regular meeting of the City Council of the City of American Canyon, State of California, held on the _________ day of ____________, ______, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
_____________________________
Leon Garcia, Mayor
ATTEST: APPROVED AS TO FORM:
_______________________________ ___________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 152
CITY COUNCIL AGENDA
FEBRUARY 6, 2024
STAFF REPORT
BUSINESS
ITEM NUMBER: 15.
TITLE
Measure "K"
RECOMMENDATION
Adopt a Resolu%on of the City Council of the City of American Canyon direc%ng City Staff to prepare a Report pursuant to Elections Code section 9212.
CONTACT
William D. Ross, City Attorney
BACKGROUND & ANALYSIS
Measure K is a voter-led ini%a%ve measure establishing a ministerial permi6ng process for development of certain warehouse facili%es by amending the City of American Canyon ("City") Municipal Code. See Consent Item No. 13 for detailed background and analysis prior to the City Council ("Council") accepting the Certificate of Sufficiency regarding the initiative petition.
On February 6, 2024, Staff recommended your Council accept the cer%fica%on of the Napa County Clerk Ex-Officio Registrar of Voters ("Registrar") as to the sufficiency of the ini%a%ve pe%%on. See, Agenda Item No. 13, Attachment 1B.
Upon the Council's acceptance the Registrar's cer%fica%on, the Council has three op%ons: 1) adopt the ordinance, without altera%on; 2) submit the ordinance, without altera%on, to the voters; or 3) order a report.
Pursuant to Elec%ons Code sec%on 9212, the Council may refer Measure K to a City agency (or agencies) for a report including:
1) Its fiscal impact.
2) Its effect on the internal consistency of the city’s general and specific plans, including the housing element, the consistency between planning and zoning, and the limita%ons on city actions[...].
3) Its effect on the use of land, the impact on the availability and loca%on of housing, and the ability of the city to meet its regional housing needs. 4) Its impact on funding for infrastructure of all types, including, but not limited to, 153
transporta%on, schools, parks, and open space. The report may also discuss whether the measure would be likely to result in increased infrastructure costs or savings, including the costs of infrastructure maintenance, to current residents and businesses. 5) Its impact on the community’s ability to attract and retain business and employment. 6) Its impact on the uses of vacant parcels of land.
7) Its impact on agricultural lands, open space, traffic conges%on, exis%ng business districts, and developed areas designated for revitalization. 8) Any other matters the [City Council] requests to be in the report.
Staff recommends Op%on 3 to analyze the poten%al impact of Measure K as applied to remaining industrial zoning within the City, and any poten%ally related financial impacts regarding the industrial zoning.
If the Council orders a report, it must be presented within 30 days of today's date, which would be on or before March 7, 2024, and would be agendized for review during the Council's Regular Meeting of March 5, 2024.
COUNCIL PRIORITY PROGRAMS AND PROJECTS
Organizational Effectiveness: "Deliver exemplary government services."
FISCAL IMPACT
The cost of comple%ng the Report is expected to be minimal but will include Staff %me to conduct the assessments.
ENVIRONMENTAL REVIEW
Not applicable.
ATTACHMENTS:
1. Resolution - Ordering Report
154
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON, CALIFORNIA, ORDERING A REPORT PURSUANT TO ELECTIONS CODE SECTION 9212 REGARDING THE INITIATIVE PETITION ENTITLED “AN INITIATIVE MEASURE
ESTABLISHING A MINISTERIAL PERMITTING PROCESS FOR DEVELOPMENT OF
CERTAIN WAREHOUSE FACILITIES BY AMENDING THE CITY OF AMERICAN CANYON MUNICIPAL CODE”
WHEREAS, on October 20, 2023, proponents of an initiative measure entitled “An Initiative Measure Establishing a Ministerial Permitting Process for Development of Certain Warehouse Facilities by Amending the City of American Canyon Municipal Code” submitted a Notice of Intention and written text of the measure and requested that a title and summary be prepared by the City Attorney for the measure to circulate the petition; and
WHEREAS, on November 6, 2023, the City Attorney prepared and provided an official ballot title and summary for the proposed Initiative for use by the proponents for publication and circulation of the petition; and
WHEREAS, the petitions regarding the initiative were filed with the City Clerk on December 21, 2023, and were then submitted to the Clerk Ex-Officio Registrar of Voters on January 4, 2024 for signature verification; and
WHEREAS, the results of the signature verification conducted and qualified by the Napa County Registrarwere in excess of the minimum number of signatures required for a regular or special election pursuant to Election Code sections 9215 and 1405; and
WHEREAS, the Clerk Ex-Officio Registrar of Voters has prepared the Certificate of Sufficiency of the Initiative Petition attached as Exhibit “A”; and
WHEREAS, the City Council of the City of American Canyon accepted the Certificate of Sufficiency regarding the initiative petition on February 6, 2024; and WHEREAS, Elections Code section 9212 authorizes the City Council to refer an initiative measure to City agencies for a report regarding eight (8) delineated categories of impact; WHEREAS, the City Council has determined a section 9212 report would provide valuable information regarding the execution of its ministerial duties under Elections Code section 9215 regarding Measure K, as well as to interested City residents.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of American Canyon does hereby 155
order, pursuant to its right and authority under Elections Code section 9212 as follows:
Section 1. City Staff to prepare a Report pursuant to Elections Code section 9212.
Section 2. The Report shall assess the impacts of Measure K pursuant to Elections Code section 9212 subsection (a)(1-8), including its application to remaining industrial zoning within the City, and any potentially related financial impacts regarding said industrial zoning.
Section 3. The Reportshall be presented to the City Council at its March 5, 2024 Regular Meeting.
PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 6th day of February, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Leon Garcia, Mayor
ATTEST: APPROVE AS TO FORM:
____________________________ _____________________________ Taresa Geilfuss, CMC, City Clerk William D. Ross, City Attorney 156
City Council Update
February 6, 2024
Public Works Department
157
Employee
Accomplishments
• Kristine Delos Santos, Engineering:
Professional Engineers License
• Phil Camacho, Streets Maintenance:
Water Distribution 1 Certification
• William De Leon , Streets
Maintenance: Commercial Drivers
License
158
Streets and Storm Drain
Operations Highlights
• Storm drain inlet inspections and cleaning
started continues through the rainy season.
• New street name sign replacement has been
completed.
• Sidewalk replacements at Brophy and Gold
Valley.
159
Capital Projects in Construction
RECYCLED WATER
EXPANSION PROJECT GREEN ISLAND ROAD
UNDERGROUNDING
PLAYGROUND
REPLACEMENTS
(COORDINATION
WITH PARKS)
SKATEPARK
RELOCATION
(COORDINATION
WITH PARKS)
BENTON WAY
REHABILITATION
(2023 ANNUAL
PAVEMENT PROJECT)
VIA BELLAGIO
PLAYGROUND
SURFACE
ANDREW ROAD
EMERGENCY SEWER
REPAIR
160
Green Island Road
Utility
Undergrounding
Project Manager: Ron Ranada
The project includes relocating approximately 4,500 feet of overhead utility lines and poles to a new underground system known as a “joint trench” on Green Island Road from Paoli Loop to Commerce Boulevard.
Status
• Joint trench work is substantially complete, but is currently suspended pending weather, and completion of two service conversions • PG&E is finalizing its efforts to begin electrical conversion • AT&T and Comcast to follow
Change Orders/Risks
• Weather Delays and impacts
• Delays with work by Utility Partners (PG&E, AT&T, Comcast) • Availability for AT&T to remove poles
Schedule
• Estimated completion - June 2024 161
Green Island Road
Widening and
Reconstruction
Project Manager: Ron Ranada
Following the undergrounding of Green Island Road, approximately 11,900 feet of existing roadways in the Green Island Industrial District will be reconstructed. Reconstruction of Green Island Road will include widening and the installation of approximately 4,200 feet of Class I facilities, including a portion of the Napa Valley Vine Trail.
Schedule
• Advertise: May 2024
• Contract award: July 2024
Funding Sources
• Local – Green Island Road Community Facilities District • Federal – Economic Development Administration, and One Bay Area Grant 3 162
Recycled
Water
Expansion
COMPLETED
Project Manager: Ron Ranada
The Project delivered 9,162 LF total of new recycled water mains and included the conversion of existing services from the domestic water system to the new recycled water system for the Benton and Spikerush Circle areas. The assignment of the Lombard-Hess portion of the Project to the Oat Hill development project has yet to start.
Schedule
Notice of Completion: February 6, 2024
Funding Sources
Local – Zero Water Footprint and Interfund Loan Water Ops Federal – Napa County: ARPA, and North Bay Water Reuse Authority: Bureau of Reclamation
Total Project Cost: $3.7 million
163
2022 Annual Pavement Project
COMPLETED
Project Manager: Ron Ranada
The Project delivered resurfaced roadways on
Donaldson Way from Carolyn to Amarillo,
Donaldson Way from Rio Del Mar to Eucalyptus,
Elke, Gisela, Rita Court, Jana Way and Rebecca
Court. Improvements also included ADA curb
ramp upgrades, new striping including bike lane
amenities, and enhanced crosswalk striping.
Schedule Notice of Completion: February 6, 2024
Funding Source • Local – Measure T, RMRA, Water Operations, and Wastewater Operations
• Total Project Cost: $2.0 million
164
Skatepark
Relocation
Project Manager: Ginny Leija
The Project consists of relocating the existing
skatepark from Benton Way to the Veterans Park.
Schedule Contract award: February 7, 2023 • Construction Completion: March 2024 Change Orders/Risks • Claims • Underground conflicts • Weather delays and impacts Funding Sources • Local – Park Impact Fees • Federal – ARPA 165
Playground
Replacement
Project Manager: Alexandra Ikeda
The Project consists of replacing playground equipment at Linwood Park, Via Bellagio Park, and Northampton Park. Northampton will include all- inclusive play equipment.
Schedule • Contract award: November 15, 2022 • Construction Completion: February 2024 Change Orders/Risks • Playground Fabrication Delays/Delivery • Weather delays and impacts Funding Sources • Local – LLAD for Via Bellagio Park and Park Impact Fees • State – 2018 Parks Bond Act Per Capital Grant 166 Via Bellagio
Park Surface
Project Manager: Alexandra Ikeda
Resurface the Via Bellagio Park playground to
provide an all-access universal play
experience for all
Schedule
• Contract award: October 2023
• Completion February 2024
Change Orders/Risks
• Underground conflicts
• Weather delays and impacts
Funding Sources
• LLAD Zone 1
167
ANDREW ROAD EMERGENCY SEWER REPAIR
Project Manager: Ron Ranada
Replace approximately 500 feet of
compromised clay sewer main on
Andrew Road between Thayer and
Crawford Way.
Schedule
Contract award: January 2024
Completion February 2024
Change Orders/Risks
• Underground conflicts
• Weather delays and impacts
Funding Sources
• Wastewater Enterprise
168
Capital Projects in Design
Newell Trail Open
Space/Parking
Benton Way
Paving and
Striping
Wetlands
Restoration Plan
ARPA Melvin
Road Sidewalk
Broadway Sewer
Rehabilitation
Stormwater
Master Plan
Wetlands Edge
Enhancement
ARPA
Knightsbridge
Reconstruction
ARPA Rancho Del
Mar Area
Silver Oak And
Northampton
Bathroom Projects
169
Newell Trail
Open Space
Project Manager: Ron Ranada
The project will provide ADA accessible
improvements to the Newell Open Space
parking lot and improved trail access up to the
fenced woodland area. Project scope includes
design, right of way acquisition and
construction. 100% Plans and Specifications
are being prepared.
Cost
• Pre-construction: $340,000
• Construction: $525,000
Tentative Timeline • Property Acquisition: March 2024 • Advertise: April 2024 • Construction: June 2024 Funding Source • Local – General Fund and Park Impact
Fees
• State – Habitat Conservation Grant
170
Wetlands Restoration Plan
Project Manager: Erica Ahmann Smithies
The purpose of the project is to develop a Wetlands Restoration Plan to guide restoration, protection, and improvement of the North Slough and Lower Napa River wetlands and uplands along the City’s shoreline. In order to establish a baseline for the Westland Restoration and Monitoring Plans, we need to conduct three feasibility studies: The North Slough Levee Flood Protection and Habitat Restoration Study, The Corp Yard Wastewater Overflow Pond and Environmental Education Facilities
Opportunities Study, and The Kayak Launch Recreational Facility Study.
Schedule • Three Feasibility Studies: July 1, 2023 • Draft Work Plan: February 10, 2024 • Final Plan: April 10, 2024 • Grant Completion: May 1, 2024 Funding Source • State – Measure AA
171
Benton Way
Rehabilitation and
Enhanced Crosswalk
Project Manager: Ron Ranada
The project will rehabilitate the pavement on Benton
Way from Wetlands Edge to Elliot Drive. Work will
include ADA curb ramp upgrades, pavement
reconstruction, new striping, enhanced crosswalk
striping, and crosswalk improvements at the
intersection of Chaucer and Benton Way.
Cost
• Pre-construction: $102,100
• Construction: $1,332,500
Schedule• Complete Design: March 2024 • Advertise: April 2024 • Begin Construction: June 2024 Funding Source • Local
– Measure T
• State – RMRA/SB1
• Federal – ARPA Fund 172
Melvin Road Sidewalk and
Drainage Improvements
Project Manager: Ginny Leija
The project will close sidewalk gaps and provide for drainage improvements between Melvin from Cassayre to James Road as well as close a couple of short sidewalk gaps on James Road to Donaldson.
Cost • Pre-construction: $150,000 • Construction: $900,000 Schedule • Complete Design: March 2024 • Advertise: April 2024 • Begin Construction: July 2024 Funding Source • Local – Measure A • Federal – ARPA 173 Stormwater
Master Plan
Project Manager: Ron Ranada
The Stormwater Master Plan will
identify system deficiencies and
potential solutions to address them.
The plan will also provide for a long-
term capital improvement program
and potential drainage impact fee on
new private development.
Cost • Design: $196,397
Milestones • Draft Model Results: January 2024 • Draft CIP List: February 2024 • Draft Plan: March 2024 • Final Plan: May 2024 Funding Source • Local – Measure A 174
Wetlands Edge
Enhancement
Project Manager: Parks/Public Works
This project will implement an outdoor educational area (open air seating area), landscape area and bathroom.
Cost
• Construction: $250,000
Milestones
• Design Award: December 2023
• Construction Award: August 2024
• Completion: December 2024
Funding Source
• Local – General Fund
• State – Educational Facilities Grant
175
SS4 Broadway Sewer
Rehabilitation
Project Manager: Ron Ranada
This project will upsize the existing sewer main on Broadway between Crawford and Donaldson through a trenchless method. Staff is currently re-scoping and expanding the project to add an additional 1,900 linear feet north, to the up-sized crossing for Watson Ranch.
Cost
• Design: $50,000*
• Construction: $950,000*
Schedule
• Complete Design: February 2024
• Advertise: March 2024
• Begin Construction: June 2024
Funding Source
• Local – Wastewater Capacity Fees
* estimated costs to be updated per expanded scope 176
Knightsbridge
Rehabilitation and
Water Main
Improvements
Project Manager: Ginny Leija
The project will replace the 8" water main
on Knightsbridge between Danrose and
Elliott including all the courts: Regent Court,
Park Lane, Lansford Court, Arden Court,
Linwood Lane. Work will include ADA ramp
upgrades, pavement treatments on
Knightsbridge and the courts, striping and
crosswalk improvements.
Cost • Design: $210,000 • Construction: $1,640,000
Milestones • Complete Design: January 2024 • Advertise: February 2024 • Begin Construction: May 2024 Funding Source • Local – Water Operations • Federal – ARPA 177
Rancho Del Mar Paving and
Utility Improvements
Project Manager: Ginny Leija
The project includes Rio Del Mar from Highway 29 to Carolyn Drive, all of Los Altos Place east of Carolyn Drive, Cassayre Drive, Flamingo Court, Del Rey Court, Alta Loma Drive, Joan Drive from Carolyn Drive to Los Altos Place, and Carolyn Drive from Rio Del Mar to Los Altos Place. Work includes ADA curb ramp upgrades, various pavement treatments, sewer CIPP and water main upgrades, striping and pavement marking upgrades.
Cost
• Design: $590,000
• Construction: $5,300,000
Milestones
• Complete Design: March 2024
• Advertise: May 2024
• Begin Construction: July 2024
Funding Source
• Local – Measure T, Water Operations, and Wastewater
Operations
• Federal – ARPA
178
SILVER OAK AND
NORTHAMPTON
BATHROOM PROJECTS
Project Manager: Erica Smithies
The Project consists of installing bathrooms
at Silver Oak and Northampton Parks. In
addition, Northampton Park includes a
shade structure.
Schedule• Design awarded: December 2023 • Construction: TBD Change Orders/Risks • Bathroom Fabrication
Delays/Delivery
• Weather delays and impacts
Funding Sources • Local – LLAD for Silver Oak Park and
Park Renovation and Replacement
Fund
179
Commercial
Development in 2023
180
Canyon Estates
COMPLETED
Project Manager: Edison Bisnar
The project is for the development of 35 lots custom estate homes. Work includes rough grading of lots. New onsite private roads, and utilities. Work also includes public improvements comprising of new sidewalk with landscaping on the east side of Newell Drive from Donaldson Way intersection up to the
property line under the PG&E tower, improvement of the City’s access road to the recycled water tank, installation of flashing beacons at crosswalks, and relocation of the City’s recycled water and potable water pipelines. • Milestones Begin Construction: March 2021 On-site work completion: December 2022 PG&E Connection: June 2023 181
Watson Ranch
26 182
Watson Ranch
Backbone
COMPLETED
Project Manager: Edison Bisnar
The Watson Ranch Project is anticipated to be
completed in four Phases. Phase 1 includes new public
streets comprising of Rio Del Mar East, extension of
Rolling Hills Drive, Mallen Way connecting to the
northern terminus of Newell Drive, Marcus Road and
installing public utilities to serve all the developments within Watson Ranch. Also include in this phase are
offsite utilities. • Milestones Begin Construction: July 2021 Completed: January 2024 183
Lemos Pointe
• 186-unit affordable apartments
• Began Construction: July 2021
• Occupancy Planned: Spring 2024
184
Artisan Subdivision (Lots 14&15)
• 98 Lot Subdivision
• Began Construction: July 2021
• Work in Progress: 72 Homes Occupied
185
Harvest Subdivision
(Lot 10)
• 219 Lot Subdivision
• Began Construction: July 2021
• Work in Progress: 45 Homes Occupied
186
Napa Cove
Apartments
66 affordable dwelling units distributed
over 3-two story and 3-story buildings at
Melvin Road next to the tennis court.
• Began Construction: April 4, 2022
• Work in Progress
187
Home2Suites
Four story 102-rooms hotel with an
outdoor pool and spa, along Broadway
at the former strawberry fields.
• Began Construction: Oct. 13, 2022
• Work in Progress
188
PG&E Regional
Service Center
Project is for the development of
98,000 square foot Regional Service
Center at Boone Drive in Napa
Logistics Park. The facility comprise of
4 buildings, laydown yard. Storage and
parking lot. • Began Construction: Oct. 13, 2022 • Work in Progress 189
Copart
Project is for an automotive storage facility at 1660 Green Island Road.
• Began Construction: February 7, 2022
• Work in Progress
190
Oat Hill
Project for is for the development of 291-
unit apartment within two parcels at Oat Hill
along Napa Junction Road west. Amenities
includes parking, community building,
swimming pool and a public trail. The project
will also undertake public improvements
including, extending approximately 1,300
lineal feet of a new 8-inch recycled water
main from end of Lombard Road to Little
League Fields, replace approximately 1,800
lineal feet of the existing 6-inch sanitary
sewer mains with a new 10-inch between
Napa Junction Road, top of the hill, to
Theresa Ave. across the senior housing,
replace approximately 590 lineal feet of the
existing 6-inch water main with a new 12-
inch between Napa Junction at Hess Drive
and Theresa Ave., and extend Napa Junction
Road from the frontage of the old Napa
Junction School to Hess Drive intersection. • Began Construction: December 19, 2022 • Work in Progress: Mass grading 191 SDG 217
Project is for a new 217,294 square foot wine Warehouse on a 10.39 Acre site at 1075 Commerce Court. This project will extend the bike trail at end of Commerce Court to Eucalyptus and Wetlands Edge intersection. • Began Construction: April 24, 2023 • Work in Progress 192 37 CityofAmericanCanyon.org/SafeStreets
193
Questions?
194
City Council Committee Report
Submitted
by: * Councilmember Mark Joseph
Council
Meeting
Date:
02/06/2024
Event
Date: 2024-01-17
Event Type Committee Report
Event Title:* Napa Valley Transportation Authority (NVTA) Event Report: The highlight of this meeting was a board discussion over the final details of the proposed Measure X (a refinement of the current Measure T funding for Streets, but adds bonding authority). After a good discussion, the Board added two adjustments: first, that no jurisdiction would get less than 3% of the tax proceeds; and second, that we would modify the "regional projects" list to ensure the fourth project--emergency response--could include expenditures for evacuation routes. This was a big concern for the UpValley cities. However, we avoided earmarking funds for any specific route--all the regional projects must compete for the $80 million funding pot.
After that, the rest of the meeting went well. Some highlights:
We approved the Environmental Review of our SR29 Corridor project--it should be completed by the end of 2025, and will give us plenty of opportunity to evaluate Roundabouts.
We received a quarterly project update report (see attached) Approved a new contract to conduct a Countywide Accessible Transportation Needs Assessment, particularly for seniors
Approved funding for a second voter poll regarding Measure X; and Heard an update on pending State/Federal legislation impacting transportation.
File/Photo Upload
9.1-Project-Update 24-01.pdf 3.7MB
Max file size for all uploads is 25 MB
Event
Date: 2024-01-26
Event Type Committee Report
Event Title:* Climate Action Committee
Event Report: Heard from several community members about the need for a wildlife conservation plan, consider replacing Ag Burning with the use of wood chippers, how Napa City received funding for its Biogas project (producing renewable diesel) while also learning the State may ban any diesel-powered trucks (including renewable diesel!); and from Students 4 Climate Action, encouraging the County to support a Fossil Free Future by banning gas stations.
Re-elected Liz Alessio and Joelle Gallagher as Chair and Vice-Chair, respectively; Viewed a video that emphasized what individuals can do to reduce GHG; Discussed progress on a Countywide Electric Reach Code; Heard a presentation on a new regional grant funding source, that would focus on "de-carbonizing" homes, and reducing vehicle miles traveled. This could provide funding for similar projects in American Canyon.
Discussed next year's priorities and how that will impact our budget requirements. There was a consensus around the smaller cities potentially sharing a position, so we can all provide more local attention to Climate Action efforts.
Reviewed the progress on the CAC's ad hoc committee relating to a project to monitor GHG in Napa County on a 24/7 real time basis.
On a related note, also connected with Napa Climate NOW to discuss their interim efforts to develop a "Dashboard" of Climate Action Metrics--ultimately, the Regional Climate Action & Adaptation Plan (RCAAP) will also develop an online metric.
File/Photo Upload Max file size for all uploads is 25 MB 195
Event
Date: 2024-01-11
Event Type Committee Report
Event Title:* Napa County League of Governments (NCLOG) Event Report: This was our first all-County meeting of the year. We met at the Kennedy Golf Course meeting room (basically a heated tent where we had dinner and the meeting). This was the first time I had been inside--it was a nice facility.
The main topic was water distribution systems and we heard from all the jurisdictions. It was a good introduction to the topic, and one of the main takeaways is that we are already all interconnected (or at least all the jurisdictions along SR29).
This means we can share water now, even without a consolidated organization. We also learned that there is a lot of collaboration currently going on, particularly in terms of shared services and supplies.
File/Photo Upload Max file size for all uploads is 25 MB Event
Date:
Event Type Other
Event Title:* Various Community Events and Activities
Event Report: Met with ACHS staff to continue planning for the Arts Foundation's second annual ACHS Arts & Music Fest, March
16. This is funded in part by a grant from Napa Valley Presents.
Also met with City staff to begin planning efforts for ACAF's Juneteenth Celebration, in partnership with Brenda Knight Events.
Attended the annual membership dinner meeting for ACAF--and accepted the role as President (mainly, to give Clarence a break!) We also added two new board members--Elizabeth Sabee and Cherol Ockrassa.
Helped with the Kiwanis Food Distribution at our new facility--bigger turnout than last month, and still no traffic problems!
Attended the monthly Kiwanis Membership Meeting and heard updates on the Food Pantry and upcoming Crab Feed (March 9-you can still buy tickets!)
Helped with the ACHS Academic Decathlon, along with Sindy Biederman. We were judges for the students last practice round, before their regional event. Turns out ACHS took Third Overall. Congrats! Attended the Chamber's monthly coffee chat
Met with City staff and former Gateway Award Winners (Gators) to review the Volunteer Recognition Ball process and to set a price of $50 per person for the dinner. It will be at the DoubleTree on April 27.
File/Photo Upload Max file size for all uploads is 25 MB 196
NVTA Project
Update
G R A N T B A I L E Y, P E
PROGRAM MANAGER – ENGINEER
JANUARY 17, 2024
1 197
Vine Trail -St. Helena to Calistoga
Project will build an 8-mile segment of the Vine Trail connecting Calistoga and St. Helena and furthers the ultimate buildout of the 47-mile Vine Trail that connects Calistoga and Vallejo.
Milestones
~75% of project paved in October 2023
Reach 7 work complete December 2023
Upcoming Work
Paver installation north of Pratt Ave
Planting
Winter suspension
Issues/Risks
Delays due to wet weather season
Unidentified buried objects/Archaeological Discoveries HAWK Crossing Electrification
Costs
Preconstruction: $3.2M
Construction: $15.2M
Project Manager: Grant Bailey
2 198
Vine Trail -St. Helena to Calistoga
Progress through Dec 2023
92%
-8%
Working Days
Days Worked Days Remaining
58%
42%
Progress Payments
Payments Made Payments Remaining
3 199
Vine Bus Maintenance Facility
Project Manager: Grant Bailey
The project located on Sheehy Court replaces the current outdated facility on Jackson Street with a new modern 6 bus bay maintenance facility and operations center and bus wash. The new facility will accommodate NVTA’s new zero emission bus fleet transition.
Milestones
Facility electrification: December 2023
Current Status
Building commissioning
Furniture & Office Equipment Procurement
Move in tentatively schedule February 2024
Photovoltaic system design and permitting
Issues/Risks
Building commissioning
Furniture Procurement
Costs
Preconstruction: $2.9M
Construction: $31.5M
4 200
Vine Bus Maintenance Facility
Project Progress through December 2023
99%
1%
Working Days
Days Worked Days Remaining
99%
1%
Progress Payments
Payments Made Payments Remaining
December 2023
September 2023
5 201
Soscol Junction Project
Project will reduce congestion on SR 29 by removing a signalized intersection at SR 221/Soscol Ferry Rd and SR 29 through grade separated roundabouts.
Status
Soscol Ferry Rd closed to SR 29 & SR 221 - detoured
Roundabout construction ongoing
Upcoming Work/Risks – Shift traffic to bridge crossing Lane closures in January 2024 for
schedule acceleration
Winter weather
Soscol Junction Schedule:
Groundbreaking – June 22, 2022
Construction – June 2022 - October 2024
Substantial Completion Target: May 2024
Costs
Preconstruction: $11.4M
Construction: $37.7M
Construction Support: $5.7M
Project Manager: Grant Bailey
6 202
SR 29 American Canyon Multimodal Improvements
Project will make operational and intersection
improvements and add multimodal facilities along SR
29 between Napa Junction Road and American
Canyon Road.
Cost
◦ Pre-construction - $20 million
◦ Construction - $55 million
Status
◦ Consultant Selected for PA&ED
◦ Recommending contract award in
January 2024
Schedule (pending funding)
◦ 2023 – PID approval (complete)
◦ 2024-25 – Environmental
◦ 2025-26 – Design
◦ 2025-26 – Right-of-way
◦ 2026 – Construction (funding dependent)
Project Manager: Danielle Schmitz
7 203
Napa Valley Forward - SR 29 Intersection Improvements
Traffic Signal Control Roundabouts
Intersection improvements including
roundabouts and/traffic calming for all modes at
the following intersections on SR29:
Phase 1:
• Rutherford Rd
• Oakville Cross Rd
Phase 2:
• Madison Ave
Phase 1 Project Cost
Pre-construction - $3 million
Construction - $9.5 million
Risks:
Right of way approval, environmental mitigation
and costs
Potential Funding Opportunities:
Federal Grants – RAISE
State Funds – LPP
Regional Funds – MTC Bay Area Forward
Fall 2023 Fall 2024 Winter 2025 Summer 2025
Project Approval
& Environmental
ROW Clearance Final Design Construction
Project Managers: Danielle Schmitz and Kate Miller
8 204
Imola Corridor
Complete Streets
Improvements
The Imola Corridor Complete Streets Project proposes improvements along Imola Avenue from Foster Rd. in the
City of Napa to Fourth Avenue in
unincorporated Napa County.
◦ Class I, II & IV Bike Facilities
◦ High visibility crossings
◦ Sidewalk & Curb Ramp Improvements
◦ Floating Transit Islands
◦ Green Streets Improvements
Cost:
Pre-construction: $3.5 million Construction: $17.5 million Potential funding sources:
Local – Measure T, Local funds
State – SHOPP, ATP, HSIP
Federal – Safe Streets for All
9 205
State Route 37
Congestion Relief and Flood Protection
4-Lane Highway
(requires mitigation for bike access)
• Sears Point to Mare Island
• 5-7 Years/$450 million
• CTC Tolling Approved
• Design Kicked Off in July 2023
• $50M awarded through LTCAP
Resilient 37
• Planning and Environmental Linkage Complete
• Segment prioritization
• 15-20 years/$6.3-$11.1 Billion
10 206
11 207