REGULAR CITY COUNCIL MEETING AGENDA
City Hall - Council Chambers
4381 Broadway St., Suite 201, American Canyon
February 3, 2026
6:30 PM

1. Conference with Legal Counsel - Exis-ng Li-ga-on. Authorized pursuant to Government Code Section 54956.9(d)(1):
a. Orchard Partners LLC et al. vs. City of American Canyon et al. (Napa Superior Court Case No. 26CV000115).

2. Conference with Legal Counsel – An-cipated Li-ga-on. Authorized pursuant to Government Code Section 54956.9 (d)(2). One (1) Matter.

Mayor: Pierre Washington
Vice Mayor: Mark Joseph
Councilmembers: Brando Cruz, Melissa Lamattina, David Oro 5:30 P.M. – CLOSED SESSION
The mayor will call the meeting to order and conduct roll call. Council will immediately convene into Closed Session after hearing any public comment on Closed Session items. At 6:30 p.m. the Council will reconvene into Open Session and then resume Closed Session at the end of the meeting to address outstanding items, if necessary.

CALL TO ORDER - CLOSED SESSION

ROLL CALL - CLOSED SESSION

PUBLIC COMMENTS - CLOSED SESSION ITEMS
This time is reserved for members of the public to address the City Council on Closed Session Items only. Comments must be made in person and are limited to 3 minutes. Comments for items on the Open Session agenda will be taken when the item is called in Open Session. Comments for Items not on the Closed Session or Open Session agenda will be heard during the Open Session Public Comment period.

MEETING RECESS - COUNCIL TO CONVENE IN CLOSED SESSION
5:30 P.M. CLOSED SESSION ITEMS
6:30 P.M. OPEN SESSION - REGULAR MEETING

CALL TO ORDER - OPEN SESSION

PLEDGE OF ALLEGIANCE

ROLL CALL - OPEN SESSION

REPORT ON CLOSED SESSION/CONFIRMATION OF REPORTABLE ACTION

PROCLAMATIONS AND PRESENTATIONS
CITY COUNCIL MEETING AGENDA FEBRUARY 3, 2026
1 3. Proclamation: Black History Month

4. Minutes of January 20, 2026
Recommendation: Approve the minutes of the Regular City Council mee5ng of January 20, 2026.

5. Marcus Road Extension
Recommendation: Adopt a Resolu5on approving Final Acceptance of the Marcus Road Extension and Appurtenant U5li5es Improvements Project from intersec5on of Car5er Street, Sta. 20+00 to Sta. 25+39, south of the future Marcus Road Bridge (DV24-0011)

6. Measure U 5-Year Expenditure Plan Update
Recommendation: Adopt a Resolu5on approving an updated Five-Year Expenditure Plan for FY 2025/26 through FY 2029/30 under Measure U (Napa Countywide Road Maintenance Act.)

7. State Route 29 Corridor Improvement Project Update
Recommendation: Receive a presenta5on from Napa Valley Transporta5on Authority (NVTA) regarding the State Route 29 Corridor Improvement Project and provide feedback.

8. OpenGov Presentation (All Departments with OpenGov)
Recommendation: Information Only

9. City Council Committee Report - Mayor Pierre Washington

PUBLIC COMMENTS - ITEMS NOT ON CLOSED SESSION OR OPEN SESSION AGENDA This time is reserved for members of the public to address the City Council on items that are not on the Closed Session or Open Session agenda and are within the subject matter jurisdiction of the City Council. Comments are limited to 3 minutes. Comments for items on the Open Session agenda will be taken when the item is called in Open Session. The City Council is prohibited by law from taking any action on matters discussed that are not on the agenda, and no adverse conclusions should be drawn if the City Council does not respond to public comment at this time.

AGENDA CHANGES
The Mayor and Council may change the order of the Agenda or request discussion of a Consent Item. A member of the Public may request discussion of a Consent Item by making that request during Public Comment.

CONSENT CALENDAR

PUBLIC HEARINGS
There are no Public Hearing Items.

BUSINESS

MANAGEMENT AND STAFF ORAL REPORTS

MAYOR/COUNCIL COMMENTS AND COMMITTEE REPORTS
The Mayor and Council may comment on matters of public concern and announce matters of public interest; no collective council action will be taken.

CITY COUNCIL MEETING AGENDA FEBRUARY 3, 2026
2 10. Future Agenda Items of Note

FUTURE AGENDA ITEMS

ADJOURNMENT

CERTIFICATION
I, Taresa Geilfuss, City Clerk for the City of American Canyon, do hereby declare that the foregoing agenda of the City Council was posted in compliance with the Brown Act prior to the meeting date. ______________________________________
Taresa Geilfuss, CMC, City Clerk

PUBLIC PARTICIPATION
This meeting is a limited public forum. American Canyon promotes respectful and responsible behavior among its meeting participants, whether they are present in person or remotely. Using offensive language or remarks that promote, foster, or perpetuate discrimination based on race, creed, color, age, religion, gender marital status, status regarding public assistance, national origin, physical or mental disability or sexual orientation/gender identification, as well as any other category protected by federal, state or local laws will not be tolerated. In the case of an occurrence, the speaker will be immediately disconnected from the microphone.

City Council and other public meetings will be conducted in person. This meeting is also available via Zoom, is broadcast live to residents on Napa Valley TV, on our website and on YouTube.

Zoom Link: Click here. Webinar ID: 847 1017 1711; Passcode: 123456. Phone in to Zoom: 408-638-0968 Oral comments, during the meeting: Oral comments can be made in person during Open and Closed Session or through Zoom in Open Session only. On Zoom use the "raise your hand" tool during any public comment period. To avoid confusion, hands raised outside of Public Comment periods will be lowered.

Written comments: Submit written comments by the eComments link, located on the Meetings & Agendas page of our website. eComments are available to council members in real time. To allow for Council review of comments, eComments will close at 3:00 pm on the day of the meeting.

The above identified measures exceed all legal requirements for participation in public comment, including those imposed by the Ralph M. Brown Act. For more information, please call the Office of the City Clerk at (707) 647-4369 or email [email protected].

AGENDA MATERIALS: City Council agenda materials are published 72 hours prior to the meeting and are available to the public via the City’s website at www.americancanyon.gov.

AMERICANS WITH DISABILITIES ACT: The City Council will provide materials in appropriate alternative formats to comply with the Americans with Disabilities Act. Please send a written request to City Clerk at 4381 Broadway, Suite 201, American Canyon, CA 94503 or by email to [email protected]. Include your name, address, phone number and brief description of the requested materials, as well as your preferred alternative format or auxiliary aid, at least three calendar days before the meeting.

CITY COUNCIL MEETING AGENDA FEBRUARY 3, 2026
3 CITY OF AMERICAN CANYON

PROCLAMATION

BLACK HISTORY MONTH - FEBRUARY 2026
WHEREAS, Black History Month is observed each February to honor the achievements, contributions, and enduring legacy of African Americans who have helped shape the history, culture, and progress of the United States; and
WHEREAS, African Americans have made invaluable contributions in every sector of society, including education, science, government, business, the arts, sports, medicine, and civil rights, often in the face of injustice and systemic barriers; and
WHEREAS, the recognition of Black history is essential to fostering understanding, equity, and respect, and to acknowledge both the struggles endured and the resilience demonstrated throughout generations; and WHEREAS, Black History Month provides an opportunity for our community to reflect on the importance of inclusion, justice, and equal opportunity, and to recommit ourselves to building a society where every individual is valued and empowered to succeed; and
WHEREAS, the City of American Canyon celebrates diversity as a strength of our community and strives to promote dignity, opportunity, and belonging for residents of all backgrounds.

NOW, THEREFORE, BE IT PROCLAIMED that I, Pierre Washington, Mayor of American Canyon, on behalf of the City Council, do hereby proclaim February 2026 as Black History Month and urge all residents to observe this month by learning about, celebrating, and honoring the rich history, culture, and contributions of African Americans.

Dated: February 3, 2026 ____________________________________ Mayor Pierre Washington
4 CITY OF AMERICAN CANYON

REGULAR CITY COUNCIL MEETING

ACTION MINUTES
January 20, 2026
6:00 P.M. – CLOSED SESSION

CALL TO ORDER - CLOSED SESSION
The City Council meeting was called to order at 6:00 p.m.

ROLL CALL - CLOSED SESSION

Present: Councilmember Melissa Lamattina, Councilmember David Oro, Vice Mayor Mark Joseph, Mayor Pierre Washington
Excused: Councilmember Brando Cruz

PUBLIC COMMENTS - CLOSED SESSION ITEMS
Mayor Washington opened public comments. Written comments: none. Oral comments: none.

The public comment period was closed.

MEETING RECESS - COUNCIL TO CONVENE IN CLOSED SESSION
6:00 P.M. CLOSED SESSION ITEMS

1. Conference with Real Property Negotiators – Authorized Pursuant to Government Code Section 54956.8. Property APNS: 058-030-016; 058-030-018 (terms and payment price). 6:30 P.M. OPEN SESSION - REGULAR MEETING

CALL TO ORDER - OPEN SESSION
The City Council meeting was called to order at 6:40 p.m.

PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited.

ROLL CALL - OPEN SESSION

Present: Councilmember Melissa Lamattina, Councilmember David Oro, Vice Mayor Mark Joseph, Mayor Pierre Washington
Excused: Councilmember Brando Cruz
5 REPORT ON CLOSED SESSION/CONFIRMATION OF REPORTABLE ACTION There were no reportable actions from Closed Session.

PROCLAMATIONS AND PRESENTATIONS
There were no proclamations or presentations.

PUBLIC COMMENTS - ITEMS NOT ON CLOSED SESSION OR OPEN SESSION AGENDA Mayor Washington opened public comments. Written comments: none. Oral comments: Nick Stocker was called to speak; Valerie Zizak-Morais was called to speak; Beth Marcus was called to speak; Yvonne Baginski was called to speak; Sherry Tennyson was called to speak; Janelle Sellick was called to speak; Hugh Marquez was called to speak; Scott Thomason was called to speak; Karen Fritz was called to speak; Justin Hamilton Hole was called to speak; Reed Robertson was called to speak; Jeanette Goyetche was called to speak; Bernice Newell was called to speak. The public comment period was closed.

AGENDA CHANGES
There were no changes to the agenda.

CONSENT CALENDAR
Action: Motion to adopt the CONSENT CALENDAR made by Vice Mayor Mark Joseph, seconded by Councilmember Melissa Lamattina, and CARRIED by roll call vote.

Ayes: Councilmember Melissa Lamattina, Councilmember David Oro, Vice Mayor Mark Joseph, Mayor Pierre Washington
Nays: None
Abstain: None

Absent: Councilmember Brando Cruz

2. Minutes of December 15, 2025
Action: Approved the minutes of the Regular City Council meeting of December 20, 2025.

3. Closed Session Reports
Action: Approved the Closed Session Reports for the meetings held on November 18, 2025, December 2, 2025, and December 16, 2025.

4. Notice of Completion for Rancho Del Mar Paving and Utility Improvements Project (TR24- 0300)
Action: Adopted Resolution 2026-021 accepting the project as complete, authorizing the Public Works Director to file a Notice of Completion (Agreement 2026-01-R), and releasing a Retention payment to Ghilotti Construction Company, Inc. in conjunction with the Rancho Del Mar Paving and Utility Improvements Project (TR24-0300).
6 5. Notice of Completion - City Hall Roof Replacement Project (CF23-0100) Action: Adopted Resolution 2026-02 accepting the project as complete and authorizing the Public Works Director to file a Notice of Completion (Agreement 2026-02-R) in conjunction with the City Hall Roof Replacement Project (CF23-0100).

6. Measure T MOE and Equivalent Fund Certification FY2024/25 Action: Adopted Resolution 2026-03 approving the Maintenance of Effort (MOE) certification of $370,015 as required under Measure "T" Program (The Napa Countywide Road Maintenance Act) Adopted Resolution 2026-04 approving certification of Equivalent Fund expenditures under the Measure "T" Program (The Napa Countywide Road Maintenance Act).

PUBLIC HEARINGS

7. Crawford Way Multifamily Condominium Tentative Subdivision Map Council received a Crawford Way Multifamily Condominium Tentative Subdivision Map staff report and presentation from Senior Planner William He. Mayor Washington opened public comments. Written comments: none. Oral comments: Philip Thomas was called to speak; Hugh Marquez was called to speak. The public comment period was closed.

Action: Motion to adopt Resolution 2026-05 approving a Tentative Subdivision Map to permit the future subdivision of the Crawford Way Project into 100 condominium multifamily dwelling units on a 4.34-acre site at the southwest corner of Crawford Way and Highway 29, APNs 058-302-001 and 058-290-012 (File No. PL25-0010) made by Vice Mayor Mark Joseph, seconded by Councilmember David Oro, and CARRIED by roll call vote.

Ayes: Councilmember Melissa Lamattina, Councilmember David Oro, Vice Mayor Mark Joseph, Mayor Pierre Washington
Nays: None
Abstain: None

Absent: Councilmember Brando Cruz
Excused: None

8. Giovannoni Logistics Center Tentative Parcel Map and Design Permit Extension Council received a Giovannoni Logistics center staff report from Senior Planner William He.

Mayor Washington opened public comments. Written comments: none. Oral comments: Valerie Zizak-Morais was called to speak; Yvonne Baginski was called to speak; Ernie Knodel was called to speak. The public comment period was closed.

Action: Motion to adopt Resolution 2026-06 for a twelve-month extension to the Giovannoni Logistics Center Tentative Parcel Map and Design Permit from March 21, 2026, to March 21, 2027, APNs 057-130-034 and 057-130-036 (File no. PL25-0013) made by Vice Mayor Mark Joseph, seconded by Councilmember David Oro, and CARRIED by roll call vote.
7 Ayes: Councilmember Melissa Lamattina, Councilmember David Oro, Vice Mayor Mark Joseph, Mayor Pierre Washington
Nays: None
Abstain: None

Absent: Councilmember Brando Cruz

BUSINESS

9. Revenue Measure
Council received a Revenue Measure staff report and presentation from Deputy City Manager Alexandra Ikeda. Mayor Washington opened public comments. Written comments: none. Oral comments: Justin Hamilton Hole was called to speak; Hugh Marquez was called to speak; Janelle Sellick was called to speak. The public comment period was closed.

Action: Motion to adopt Resolution 2026-07 authorizing a budget appropriation of $110,000 from the General Fund Undesignated Reserve and awarding a professional services agreement (Agreement 2026-07) to Fairbank, Maslin, Maullin, Metz & Associates (FM3) in an amount not to exceed $60,000, and increase the professional services agreement with Tripepi Smith & Associates from $233,000 to $283,000 for public opinion research and community outreach and education services related to a potential ballot measure. made by Vice Mayor Mark Joseph, seconded by Councilmember Melissa Lamattina, and CARRIED by roll call vote.

Ayes: Councilmember Melissa Lamattina, Councilmember David Oro, Vice Mayor Mark Joseph, Mayor Pierre Washington
Nays: None
Abstain: None

Absent: Councilmember Brando Cruz
Excused: None

MANAGEMENT AND STAFF ORAL REPORTS

10. Q3 FY25/26 Capital Project Schedule Update
Council received a Q3 FY25/26 Capital Project Schedule oral update from Public Works Director Erica Ahmann Smithies. Other oral updates were given by Deputy City Manager Alexandra Ikeda.

MAYOR/COUNCIL COMMENTS AND COMMITTEE REPORTS
The mayor and council members provided oral reports and announced items of community interest.
8 FUTURE AGENDA ITEMS

12. Future Agenda Items of Note
Action: Motion to add to a future agenda a review of the Inclusionary Housing Ordinance made by Vice Mayor Mark Joseph, seconded by Councilmember Melissa Lamattina, and CARRIED by roll call vote.

Ayes: Councilmember Melissa Lamattina, Councilmember David Oro, Vice Mayor Mark Joseph, Mayor Pierre Washington
Nays: None
Abstain: None

Absent: Councilmember Brando Cruz

ADJOURNMENT
The meeting was adjourned at 9:00 p.m.

CERTIFICATION
Respectfully Submitted,
_____________________________________
Taresa Geilfuss, CMC
City Clerk
9 CITY COUNCIL AGENDA
FEBRUARY 3, 2026

STAFF REPORT

CONSENT
ITEM NUMBER: 5.

TITLE
Marcus Road Extension

RECOMMENDATION
Adopt a Resolu'on approving Final Acceptance of the Marcus Road Extension and Appurtenant U'li'es Improvements Project from intersec'on of Car'er Street, Sta. 20+00 to Sta. 25+39, south of the future Marcus Road Bridge (DV24-0011)

CONTACT
Erica Ahmann Smithies, P.E., Public Works Director
Edison Bisnar, P.E., Senior Civil Engineer

BACKGROUND & ANALYSIS
On October 16, 2018, The City of American Canyon City Council approved the Watson Ranch Specific Plan (WRSP), Ordinance 2018-08, as regula'ng document for the approximately 309-acre property owned by AC-1 and the Newell Family. The WRSP is a mixed-use community including a mixed-use town Center, 1,253 residen'al units, approximately 23 acres of improved parks, an addi'onal 30 acres of parks, trails and open space, roads and suppor'ng water, wastewater, recycled water and storm drainage infrastructure. The Watson Ranch Master Backbone Infrastructure (MBI) Improvements were developed in four phases.

On January 16, 2024, the City Council of the City of American Canyon accepted Phase 1 of the MBI Improvements which included Rio Del Mar East, Rolling Hills Drive Extension, Mallen Way and Marcus Road from Rio Del Mar north to Cartier Street.

On October 9, 2024, the City of American Canyon Public Works Department approved the Marcus Road Extension Improvement Plans.

On October 1, 2025, Marcus Road Extension was completed, and the Record Drawings and Cer'fied LeAers have been submiAed to Public Works and were found to be in substan'al conformance with the approved Improvement Plans, with excep'on of a por'on of the western sidewalk that is unpaved due to pending PG&E work.

On December 22, 2025, the remaining Pacific Gas and Electric work was completed and the por'on 10 of the sidewalk was paved.

COUNCIL PRIORITY PROGRAMS AND PROJECTS
Transporta'on: "Improve the transporta'on network within the City to alleviate conges'on and enhance the quality of life for the community."

FISCAL IMPACT
All costs associated with the opera'on and maintenance of the public facili'es will be the responsibility of the city.

ENVIRONMENTAL REVIEW
Pursuant to the California Environmental Quality Act, the Final Environmental Impact Report for the Project was presented at a no'ced public hearing held on October 4, 2018. The Planning Commission adopted Resolu'on 2018-19 recommending that the City Council adopt the Mi'ga'on Monitoring and Reporting Program.

COMMUNICATION
Level 0: No Further Public Communication Needed
ATTACHMENTS:

1. Resolution - Marcus Road Extension Final Acceptance
11 RESOLUTION NO. 2026 - _____

RESOLUTION ACCEPTING MARCUS ROAD EXTENSION AND APPURTENANT UTILITIES IMPROVEMENTS PROJECT FROM INTERSECTION OF CARTIER STREET, STA. 20+00 TO STA 25+39, SOUTH OF THE FUTURE MARCUS ROAD BRIDGE (DV24-0011)
WHEREAS, on October 16, 2018, The City of American Canyon City Council approved the Watson Ranch Specific Plan (WRSP), Ordinance 2018-08, as regulating document for the approximately 309-acre property owned by AC-1 and the Newell Family. The WRSP is a mixed-use community including a mixeduse town Center, 1,253 residential units, approximately 23 acres of improved parks, an additional 30 acres of parks, trails and open space, roads and supporting water, wastewater, recycled water and storm drainage infrastructure. The Watson Ranch Master Backbone Infrastructure (MBI) Improvements were developed in four phases; and
WHEREAS, on January 16, 2024, the City Council of the City of American Canyon accepted Phase 1 of the MBI Improvements which included Rio Del Mar East, Rolling Hills Drive Extension, Mallen Way and Marcus Road from Rio Del Mar north to Cartier Street; and WHEREAS, on October 9, 2024, the City of American Canyon Public Works Department approved the Marcus Road Extension Improvement Plans; and
WHEREAS, on October 1, 2025, Marcus Road Extension was completed, and the Record Drawings and Certified Letters have been submitted to Public Works and were found to be in substantial conformance with the approved Improvement Plans, with the exception of a portion of the western sidewalk that is unpaved due to pending PG&E work; and
WHEREAS, on December 22, 2025, the PG&E work was completed and the sidewalk was paved.

NOW, THEREFORE, BE IT FURTHER RESOLVED that the City Council of the City of American Canyon hereby accepts the Marcus Road Extension public improvements into the City’s system for operation and maintenance.

PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 3rd day of February 2026, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
________________________________
Pierre Washington, Mayor
ATTEST: APPROVED AS TO FORM:
______________________________ ______________________________ Taresa Geilfuss, CMC, City Clerk Teresa Highsmith, City Attorney 12 CITY COUNCIL AGENDA
FEBRUARY 3, 2026

STAFF REPORT

CONSENT
ITEM NUMBER: 6.

TITLE
Measure U 5-Year Expenditure Plan Update

RECOMMENDATION
Adopt a Resolu(on approving an updated Five-Year Expenditure Plan for FY 2025/26 through FY 2029/30 under Measure U (Napa Countywide Road Maintenance Act.)

CONTACT
Erica Ahmann Smithies, P.E., Public Works Director
Ron Ranada, P.E., Senior Civil Engineer

BACKGROUND & ANALYSIS
The 2012 “Napa Countywide Road Maintenance Act” (also known as “Measure T”) imposes a ½ cent sales tax to pay for road repairs countywide. The Napa Valley Transportation Authority – Tax Agency (NVTA-TA) distributes these sales tax revenues to American Canyon on a monthly basis. The City of American Canyon received 7.7% of the sales tax revenues per year, from July 1, 2018 through June 30, 2025.

On November 5, 2024 the voters of Napa County passed the Napa Valley Transporta(on Improvement Act, also known as Measure U (superseding Measure T), which con(nues the half cent transac(on and use (sales) tax to provide supplemental funding for road maintenance. The City of American Canyon is es(mated to receive 8.0% of the Measure U sales tax revenues per year, beginning on July 1, 2025.

With Measure U, the percentage of sales tax revenues per year will be reviewed every five years therefore the City's alloca(on could go up or down. In addi(on, the City is allowed to bond for transportation projects in order to advance street repairs.

Similar to Measure T, in order to receive Measure U funds, the City must submit a list of projects to be funded to NVTA – TA. This list is known as the Five Year Expenditure Plan (Plan) and will be updated at a minimum of every 2 years. Expenditure plans are developed considering the following factors: recommenda(ons from the Pavement Management Program (PMP) report, known u(lity 13 deficiencies, local priori(es and the an(cipated funding schedule. Importantly, the Plan is not annual “construc(on schedule” per se; rather, it is a “5-year look ahead” of streets to be addressed in successive years based upon available funding and priori(es. The result is a list of streets with various pavement treatments proposed over the next five years.

On May 6, 2025, City Council adopted Resolu(on 2025-30 approving the five-year expenditure plan for FY 2025/26 through FY 2029/30 that was similar to prior plans and included addi(onal streets that City Council had priori(zed based on adopted capital projects and earlier Council discussions.

Staff is recommending an update to the street list earlier than May 2027 in order to address two street projects that need to be prioritized:

South Kelly Road from Highway 29 to Devlin Road: The reconstruc(on of South Kelly Road is currently in the adopted FY 2025-26 budget and is nearing design comple(on. The project did not include addi(onal funding other than developer contribu(ons therefore staff is recommending the additional funding come from from Measure U to complete construction of the local street work.

Green Island Road from Jim Oswalt Way to the City limits: This segment of Green Island Road was not included in the current reconstruc(on efforts underway in the Green Island Road District.

However, it is in need of near-term maintenance repairs and a future capital alloca(on for full repaving. The es(mated cost of the maintenance work is $235,000 in FY 2025-26, with addi(onal funding in FY 2027-28 for the future capital project. Staff is aware that Napa County plans to repave its sec(on of Green Island Road in the coming years and intends to coordinate efforts, similar to the South Kelly Reconstruction Project.

COUNCIL PRIORITY PROGRAMS AND PROJECTS
Infrastructure: "Develop and maintain infrastructure resources to support sustainable growth."

FISCAL IMPACT
By adop(ng this Resolu(on and submiOng the updated five-year plan to NVTA-TA, the City of American Canyon will be eligible to u(lize Measure U revenues on the addi(onal street projects. It is the intent to include any known budget modifica(ons in the mid-year budget which is slated for a future City Council meeting or at the time of contract award of the respective projects.

ENVIRONMENTAL REVIEW
Approval of the Five-Year Measure U Expenditure Plan is exempt from review under the California Environmental Quality Act (“CEQA”) because the ac(on is not a “Project” as defined under CEQA, and because ac(ons that have no poten(al to cause a significant effect on the environment and ac(ons that will not result in a direct or reasonably foreseeable indirect physical change in the environment are exempt from CEQA. (Pub. Res. Code § 21065; CEQA Guidelines §§ 15061(b)(3); 15060(c)(2)), and 15378(b).
14 ATTACHMENTS:

1. Resolution - Measure U 5-Year Project List

1. Exhibit A: Measure U Five-Year List of Projects

2. Five-Year Measure U Map Update
15 RESOLUTION NO. 2026-
RESOLUTION APPROVING AN UPDATED FIVE-YEAR EXPENDITURE PLAN FOR FY 2025/26 THROUGH FY 2029/30 UNDER MEASURE U (NAPA COUNTYWIDE ROAD MAINTENANCE ACT) WHEREAS, on November 5, 2024 the voters of Napa County passed the Napa Valley Transportation Improvement Act, also known as Measure U, which continues a half cent transaction and use (sales) tax to provide supplemental funding for road maintenance as detailed in the Measure U Expenditure Plan; and
WHEREAS, the Napa Valley Transportation Authority-Tax Agency (NVTA-TA) is the designated agency that administers and oversees the Measure U revenues; and
WHEREAS, the City of American Canyon is an eligible recipient of Measure U funds; and WHEREAS, the tax proceeds will be used to pay for the projects outlined in the Measure U Expenditure Plan allocated to the County of Napa, cities, town, and NVTA within Napa County (“Local Agencies”) as set forth in Measure U; and
WHEREAS, under the Measure U Expenditure Plan, Measure U funds are provided to the Local Agencies to be used for streets and roads projects as defined in the Ordinance; and WHEREAS, on May 6, 2025, City Council adopted Resolution 2025-30 approving the initial five-year Measure U expenditure plan for FY 2025/26 through FY 2029/30; and WHEREAS, there is a need to update the five-year Measure U expenditure plan to include a portion of Green Island Road between Jim Oswalt Way and the City Limits as well as South Kelly Road between State Route 29 and Devlin Road; and
WHEREAS, Measure U project(s) will comply with the requirements under the California Environmental Quality Act (California Code Sections 21000 et seq.; as implemented through California Regulations Title 14, Chapter 3, Sections 15000 et seq.).

NOW, THEREFORE, BE IT RESOLVED the City Council of the City of American Canyon does resolve as follows:

1. The City Council of the City of American Canyon hereby adopts the updated Five-Year Expenditure Plan (for FY 2025/26 through FY 2029/30 attached hereto as Exhibit “A,” and authorizes the Public Works Director to file the list with NVTA-TA.

2. The Resolution is hereby adopted and becomes effective and in full force immediately upon adoption.

PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 3rd day of February, 2026 by the following vote:
16 2
AYES:

NOES:

ABSTAIN:

ABSENT:
____________________________
Pierre Washington, Mayor
ATTEST: APPROVE AS TO FORM:
____________________________ _____________________________ Taresa Geilfuss, CMC, City Clerk Teresa L. Highsmith, City Attorney 17 Measure U - Napa Valley Transportation Improvement Act Jurisdiction Name:Primary Contract #1 Email: Phone:Secondary Contract #2 Email: Phone:Fiscal Years Included: FY #1 2025-26 FY #2 2026-27 FY#3 2027-28 FY#4 2028-29 FY#5 2029-30Maintenance of Effort (MOE)Please provide the following information to establish MOE amount and to validate information:
$ 370,015.00$ 370,015.00
Planned Measure U ExpendituresPlease provide Five (5) year planned local streets and road maintenance projects beginning in FY 2025-30 (add rows as needed):

Fiscal Year Total Project Cost Measure U Funds Other Funds 2025-26 $ 2,000,000.00 $ 1,000,000.00 $ 1,000,000.00 2025-26 $ 235,000.00 $ 235,000.00 $ - 2025-26 $ 50,000.00 $ 50,000.00 $ - 2025-26 $ 6,000,000.00 $ 1,000,000.00 $ 5,000,000.00 Construction2025-26 $ 3,000,000.00 $ 200,000.00 $ 2,800,000.00 Construction2025-26 $ 2,000,000.00 $ 100,000.00 $ 1,900,000.00 Construction2025-26 $ 2,000,000.00 $ 100,000.00 $ 1,900,000.00 Construction2025-26 $ 2,000,000.00 $ 100,000.00 $ 1,900,000.00 Construction2025-26 $ 780,000.00 $ 500,000.00 $ 280,000.00 2025-26 $ 600,000.00 $ 100,000.00 $ 487,500.00 2025-26 Overlay $ 200,000.00 $ 50,000.00 $ 162,500.00 Poco Way2025-26 Overlay $ 600,000.00 $ 100,000.00 $ 487,500.00 2025-26 Overlay $ 200,000.00 $ 50,000.00 $ 162,500.00 2025-26 Surface Treatment 155,239.38 $ 155,239.38 $ $ - Knightsbridge Wy Elliott Dr Danrose Dr Construction2025-26 Surface Treatment 27,832.72 $ 27,832.72 $ $ - Arden Ct Knightsbridge Wy End Construction2025-26 Surface Treatment 33,420.35 $ 33,420.35 $ $ - Lansford Ct Knightsbridge Wy End Construction2025-26 Surface Treatment 27,832.72 $ 27,832.72 $ $ - Linwood Lane Knightsbridge Wy End Construction2025-26 Surface Treatment 27,832.72 $ 27,832.72 $ $ - Park Lane Knightsbridge Wy End Construction2025-26 Surface Treatment 33,314.92 $ 33,314.92 $ $ - Regent Ct Knightsbridge Wy End Construction2025-26 Surface Treatment 216,878.32 $ 216,878.32 $ $ - Cartagena Way Broadway East End Design, PS&E, Construction2025-26 Surface Treatment 16,153.70 $ 16,153.70 $ $ - Aranda Ct Cartagena Way N End Design, PS&E, Construction2025-26 Surface Treatment 33,279.60 $ 33,279.60 $ $ - Barcelona Dr Cartagena Way Entrada Cir Design, PS&E, Construction2025-26 Surface Treatment 34,924.89 $ 34,924.89 $ $ - Catalonia Dr Cartagena Way Entrada Cir Design, PS&E, Construction2025-26 Surface Treatment 252,775.42 $ 252,775.42 $ $ - Entrada Cir Cartagena Way W End Cartagena Way E End Design, PS&E, Construction2025-26 Surface Treatment 26,922.83 $ 26,922.83 $ $ - Marbella Ct Cartagena Way N End Design, PS&E, Construction2025-26 Surface Treatment 10,096.06 $ 10,096.06 $ $ - Palencia Ct Cartagena Way N End Design, PS&E, Construction2025-26 Surface Treatment 35,315.44 $ 35,315.44 $ $ - Condor Ct Highridge Dr S End Design, PS&E, Construction2025-26 Surface Treatment 14,583.20 $ 14,583.20 $ $ - Eisenhower Ct Ventana S End Design, PS&E, Construction 2025-26 Surface Treatment 147,327.69 $ 147,327.69 $ $ - Ford Dr Independance Independence Design, PS&E, Construction2025-26 Surface Treatment 114,987.06 $ 114,987.06 $ $ - Goldfinch Dr Montevino Montevino Design, PS&E, Construction2025-26 Surface Treatment 16,245.10 $ 16,245.10 $ $ - Highridge Ct Ventana N End Design, PS&E, Construction2025-26 Surface Treatment 126,853.04 $ 126,853.04 $ $ - Highridge Dr Ventana Starling Ct Design, PS&E, Construction Reconstruct Full Reconstruct (AC) Jim Oswald Way Mezzetta Court EndReconstruct Full Reconstruct (AC) Hanna Way Commerce Boulevard EndCommerce Boulevard Green Island Road Old Cul de SacMezzetta Court Green Island Road End Reconstruct Full Reconstruct (AC) Green Island Road Paoli Loop Mezzetta CourtReconstruct Full Reconstruct (AC) Reconstruct Full Reconstruct (AC) Project Phase
(Design, ENV, PS&E, CON)
ConstructionConstructionDesign, PS&E, Construction
Highway 29Melvin RoadWilson Wy
Andrew RoadDonaldson WyMelvin Road
--
City LimitsCassayare Dr
Start
--
Flosden RoadWilson Wy
Cape SealCape SealCape SealCape Seal
Citywide
American Canyon RoadEastMelvin RoadWilson Way
Cape SealCape SealCape SealCape SealCape SealCape SealCape Seal Traffic CalmingGuardrailOverlay
Grind and Overlay Grind and Overlay James Road Radar Feedback Signs Guardrail Upgrades Grind and Overlay Grind and Overlay Cape SealCape Seal City of American Canyon
Erica Ahmann Smithies
Ron Ranada
[email protected]
[email protected] 707-647-4559
707-647-4366
Please note: Eligible expenses include local streets and roads maintenance and supporting infrastructure within the public right of way for pavement, sealing, overlays, reconstruction, associated infrastructure, as required, excluding any local revenues expended for the pupose of storm damage repair as verified by an independent auditor. One time allocations that have been expended for local streets and road maintenance, but which may not be available on an ongoing basis shall not be considered when calculating an Agency's annual maintenance of effort.

Program / Project Type Project Description
Most Recent FYTotal MOE:

1. Enter MOE Amounts Claiming:2. Enter Certified MOE Amount:

Location (Intersection,
Mile Marker, Length of
Alignment, etc)
End
Design, PS&E, ConstructionDesign, PS&E, ConstructionDesign, PS&E, Construction Cape SealCape SealCape SealCape SealCape SealCape Seal
Reconstruct Full Reconstruct (AC) South Kelly Road Highway 29 Devlin Road Design, PS&E, ConstructionMaintenance Grind and Overlay Green Island Road Jim Oswalt Way City Limits Construction 18 2025-26 Surface Treatment 34,609.13 $ 34,609.13 $ $ - Hillcrest Ct Highridge Dr S End Design, PS&E, Construction 2025-26 Surface Treatment 15,480.62 $ 15,480.62 $ $ - Independence Ct Ventana Dr South End Design, PS&E, Construction2025-26 Surface Treatment 85,704.33 $ 85,704.33 $ $ - Independence Dr Ventana Dr East End Design, PS&E, Construction2025-26 Surface Treatment 35,315.44 $ 35,315.44 $ $ - Mockingbird Dr Montevino Highridge Dr Design, PS&E, Construction2025-26 Surface Treatment 63,567.78 $ 63,567.78 $ $ - Montevino Dr South Goldfinch Ventana Design, PS&E, Construction2025-26 Surface Treatment 33,196.51 $ 33,196.51 $ $ - Oriole Ct Hidgeridge Dr S End Design, PS&E, Construction2025-26 Surface Treatment 18,364.03 $ 18,364.03 $ $ - Starling Ct Highridge Dr N. End Design, PS&E, Construction2025-26 Surface Treatment 23,407.90 $ 23,407.90 $ $ - Truman Ct Ventana Dr S End Design, PS&E, Construction2025-26 Surface Treatment 57,784.36 $ 57,784.36 $ $ - Ventana Dr Broadway Highridge Dr Design, PS&E, Construction2025-26 Surface Treatment 80,394.55 $ 80,394.55 $ $ - Ventana Dr Highridge East West Independence Dr Design, PS&E, Construction2025-26 Surface Treatment 52,973.15 $ 52,973.15 $ $ - Vine Terrace Way Broadway Goldfinch Design, PS&E, Construction2025-26 Reconstruct Full Reconstruct (AC) 744,758.04 $ 253,389.40 $ 491,368.64 $ Rio Del Mar Carolyn Dr W Los Altos Dr Construction2025-26 Reconstruct Full Reconstruct (AC) 545,806.86 $ 185,700.14 $ 360,106.72 $ Rio Del Mar W Los Altos Dr Cassayare Dr Construction2025-26 Reconstruct Full Reconstruct (AC) 276,830.10 $ 94,186.04 $ 182,644.06 $ Rio Del Mar Cassayare Dr Hwy 29 Construction2025-26 Surface Treatment Cape Seal 54,842.79 $ 18,659.19 $ 36,183.60 $ Carolyn Dr Rio Del Mar Los Altos Dr Construction2025-26 Surface Treatment Cape Seal 69,654.50 $ 23,698.59 $ 45,955.92 $ Joan Dr Carolyn Dr Los Altos Dr Construction2025-26 Surface Treatment Cape Seal 151,960.24 $ 51,701.51 $ 100,258.73 $ Los Altos Dr Carolyn Dr Rio Del Mar Construction2025-26 Surface Treatment Cape Seal 37,081.21 $ 12,616.16 $ 24,465.05 $ Los Altos Dr Theresa Ave Rio Del Mar East Construction2025-26 Surface Treatment Cape Seal 36,196.24 $ 12,315.07 $ 23,881.18 $ Del Rey Ct Los Altos Dr End Construction2025-26 Surface Treatment Cape Seal 108,588.73 $ 36,945.20 $ 71,643.53 $ Alta Loma Dr Joan Dr End Of Circle Construction2025-26 Surface Treatment Cape Seal 67,099.33 $ 22,829.24 $ 44,270.09 $ Flamingo Ct Rio Del Mar End Construction2025-26 Surface Treatment Cape Seal 52,786.19 $ 17,959.47 $ 34,826.72 $ Cassayare Dr Rio Del Mar West Rio Del Mar East Construction2025-26 Surface Treatment Cape Seal 95,912.57 $ 95,912.57 $ $ - Rio Del Mar Rio Grande Donaldson Wy Design, PS&E, Construction2025-26 Surface Treatment Cape Seal 123,265.41 $ 123,265.41 $ $ - Rio Del Mar Donaldson Wy Carolyn Dr Design, PS&E, Construction2025-26 Overlay Mill+Overlay 306,575.28 $ 306,575.28 $ $ - Theresa Av Napa Junction Rd 422' North Of Eucalyptus Dr Design, PS&E, Construction2026-27 Overlay Mill+Overlay 485,555.84 $ 485,555.84 $ $ - Eucalyptus Dr Donaldson Wy 450' W Of Theresa Ave Design, PS&E, Construction2026-27 Reconstruct Full Reconstruct (AC) 175,746.23 $ 175,746.23 $ $ - Donaldson Wy Rio Del Mar Amarillo Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 98,717.03 $ 98,717.03 $ $ - Rio Grande Rio Del Mar Carmel Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 70,967.41 $ 70,967.41 $ $ - W Carolyn Dr Donaldson Wy Rio Del Mar Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 38,389.96 $ 38,389.96 $ $ - Carolyn Dr Los Altos Dr Amarillo Dr Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 47,769.32 $ 47,769.32 $ $ - Landana Dr Rio Grande Donaldson Wy Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 51,415.12 $ 51,415.12 $ $ - Landana Dr Donaldson Wy W Carolyn Dr Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 87,249.90 $ 87,249.90 $ $ - Joan Dr W End Carolyn Dr Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 72,392.49 $ 72,392.49 $ $ - Amarillo Dr Carolyn Dr W. End Design, PS&E, Construction2026-27 Surface Treatment Cape Seal 71,617.63 $ 71,617.63 $ $ - Los Altos Dr Donaldson Wy Carolyn Dr Design, PS&E, Construction2026-27 Reconstruct Reconstruct inc. SD & C& $ 392,076.30 392,076.30 $ $ - Andrew Rd Thayer Wy Crawford Wy Design, PS&E, Construction 2026-27 Reconstruct Reconstruct inc. SD & C& $ 816,401.30 816,401.30 $ $ - Andrew Rd Crawford Wy Donaldson Wy Design, PS&E, Construction2026-27 Reconstruct Reconstruct inc. SD & C& $ 604,238.80 604,238.80 $ $ - Andrew Rd Donaldson Wy Wilson Wy Design, PS&E, Construction2027-28 $ 2,000,000.00 $ 1,000,000.00 $ 1,000,000.00 2027-28 Reconstruct Full Reconstruct (AC) 135,784.00 $ 135,784.00 $ $ - Brixton Ct North Hampton Dr E. End Design, PS&E, Construction2027-28 Reconstruct Full Reconstruct (AC) 271,568.00 $ 271,568.00 $ $ - Dorchester Pl Knightsbridge Wy S. End Design, PS&E, Construction2028-29 Overlay Mill+Overlay 308,579.04 $ 308,579.04 $ $ - Marla Dr Kilpatric St Blanco Design, PS&E, Construction2028-29 Overlay Mill+Overlay 43,718.40 $ 43,718.40 $ $ - Marla Dr Kilpatric 240 Feet West Design, PS&E, Construction2028-29 Overlay Mill+Overlay 45,418.56 $ 45,418.56 $ $ - Tyler Ct Kimberly Dr N. End Design, PS&E, Construction2029-30 Reconstruct Full Reconstruct (AC) 1,629,408.00 $ 1,629,408.00 $ $ - Flosden Rd American Canyon Road South City Limits Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 54,294.37 $ 54,294.37 $ $ - Corbin Dr N. End S. End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 36,196.24 $ 36,196.24 $ $ - Reed Dr Danrose Dr Corbin Dr Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 43,076.52 $ 43,076.52 $ $ - Bettona Way San Marco Way Vinci Way Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 21,687.83 $ 21,687.83 $ $ - Blue Elder Ct Red Clover Wy East End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 21,895.57 $ 21,895.57 $ $ - Bresso Ct Vinci Way E End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 12,040.49 $ 12,040.49 $ $ - Bullrush Ct Red Clover Wy East End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 20,412.32 $ 20,412.32 $ $ - Carrara Ct Vinci Way East End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 17,163.30 $ 17,163.30 $ $ - Gull Peacock E End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 101,708.45 $ 101,708.45 $ $ - Hummingbird Benton Way W. Am. Can. Rd Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 49,059.37 $ 49,059.37 $ $ - Kensington Wy Chaucer Wetlands Edge Rd Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 31,397.50 $ 31,397.50 $ $ - Knightsbridge Wy W. End Chaucer Ln Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 62,383.68 $ 62,383.68 $ $ - Knightsbridge Wy Chaucer Ln Elliott Dr Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 17,163.30 $ 17,163.30 $ $ - Lark Peacock E End Design, PS&E, Construction 2029-30 Surface Treatment Cape Seal 10,469.99 $ 10,469.99 $ $ - Northhampton Dr Chaucer San Marco Way Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 22,601.88 $ 22,601.88 $ $ - Northrup Ln Chaucer West End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 20,482.95 $ 20,482.95 $ $ - Northrup Ln Chaucer West End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 109,407.22 $ 109,407.22 $ $ - Peacock Humming Bird Humming Bird Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 132,669.70 $ 132,669.70 $ $ - Red Clover Wy North End South End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 22,435.69 $ 22,435.69 $ $ - Reed Grass Redclover E End Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 150,319.11 $ 150,319.11 $ $ - San Marco Way Wetlands Edge Rd Bettona Way Design, PS&E, Construction Green Island Road Jim Oswalt Way City Limits Design, PS&E, Construction Cape SealCape SealCape SealCape SealCape SealCape SealCape SealCape SealCape SealCape SealCape Seal Overlay Grind and Overlay
19 2029-30 Surface Treatment Cape Seal 209,773.69 $ 209,773.69 $ $ - Spikerush Cir S Wetlands Edge Rd N Wetlands Edge Rd Design, PS&E, Construction 2029-30 Surface Treatment Cape Seal 69,700.21 $ 69,700.21 $ $ - Vinci Way San Marco Way Bettona Way Design, PS&E, Construction2029-30 Surface Treatment Cape Seal 25,127.97 $ 25,127.97 $ $ - Water Fern Redclover E End Design, PS&E, ConstructionEquivalent Fund Class I / IV Multi-Purpose Paths:Please provide a five year list of multimodal projects (Class I or IV) beginning in FY 2025-30 (add rows as needed):

Fiscal Year Total Project Cost Funding Source Length
2025-26 $ 1,088,818.71 OBAG/CFD 4200Comment: Please provide any additional information to explaing your project list. E.g. This project list is the jurisdiction's CIP, the jurisdiction opted to include additional projects to have flexibility in completing a variety of projects Project Phase
(Design, ENV, PS&E, CON)
Paoli Loop Design, PS&E, Construction
Program / Project Type
Reconstruct
Project Location
Green Island Road
Project Description
Green Island Road Class 1 Trail
Start End
Commerce Court
This project list is an update to the initial Measure U list approved in FY24-25 and includes the addition of three street projects: two Green Island Road projects in 2025-26 and 2027-28 as well as South Kelly Road in 2025-26.Note: The amount of a jurisdiction's annual bike expenditure must be a minimum of 7% of the anticipated revenue amount received from Measure U each year. Estimates by jurisdiction are shown on the table labeled "Measure U Revenue Estimates". Funding for Class I / IV Multi-use path projects that are funded by philanthropy, state discretionary funding or federal discretionary funding shall not count as part of the 7% expenditure obligation required to be eligible to receive Measure U revenues.Note: The list will serve as the five-year list of projects required for submittal by each jurisdiction as stated in the Measure U Ordinance. These will be projects that will be delivered, depending on available revenues and when revenues become available.

Prior to any allocation, jurisdictions will also be required to submit all of the necessary documentation requested as evidence of a public meeting to ensure that the members of the public were able to comment on the proposed project list as well as a Resolution in support of the proposed project list. 20 21

CITY COUNCIL AGENDA
FEBRUARY 3, 2026

STAFF REPORT

BUSINESS
ITEM NUMBER: 7.

TITLE
State Route 29 Corridor Improvement Project Update

RECOMMENDATION
Receive a presenta(on from Napa Valley Transporta(on Authority (NVTA) regarding the State Route 29 Corridor Improvement Project and provide feedback.

CONTACT
Erica Ahmann Smithies, P.E., Public Works Director

BACKGROUND & ANALYSIS
American Canyon State Route 29 Corridor Improvement Project The Napa Valley Transporta(on Authority (NVTA), in coopera(on with the California Department of Transporta(on (Caltrans) and the City of American Canyon (City), proposes roadway improvements along State Route 29 (SR 29) within much of the City limits to address various opera(onal and safety needs along the SR 29 corridor.

In May 2020, NVTA completed the SR 29 Comprehensive Mul(modal Corridor Plan. Subsequently, a Project Study Report on the SR 29 corridor in American Canyon was ini(ated, proposing key enhancements such as improved signal infrastructure and roundabouts. This revision aligned the corridor planning process with the funding requirements outlined in SB 1, mee(ng the Comprehensive Mul(modal Corridor Plan (CMCP) guidelines established by the California Transportation Commission in December 2018.

Following comple(on of the CMCP update, NVTA moved forward with work to complete a Project Study Report – Project Development Support (PSR-PSD), also referred to as the project ini(a(on document (PID), focusing on a segment of the SR-29 corridor in American Canyon between Napa Junc(on Road and American Canyon Road. The PID adhered to Caltrans’ Project Development Procedures Manual, evalua(ng high-level project alterna(ves, defining scope, cost, and schedule for each option.

In February 2023, Caltrans and NVTA finalized the PID, iden(fying three alterna(ves, two build and one no-build. The build alternatives propose the following improvements:
22 Alterna(ve 1: Enhancements to exis(ng intersec(on signal infrastructure, featuring transit signal priority for queue jump lanes to optimize traffic flow and operational efficiency.

Alterna(ve 2: Replace five of six signalized intersec(ons along the corridor with roundabouts, increasing overall circula(on whilst providing traffic calming and enhanced intersec(on safety for all users.

Both build alterna(ves will construct enhanced transit stops, relocate exis(ng overhead u(li(es, and replace/construct new bicycle and pedestrian facilities.

On January 16, 2024, City Council authorized Resolu(on No. 2024-03 authorizing the next stage of project development which is the Project Approval and Environmental Document (PA&ED) phase through a Coopera(ve Agreement No. 04-2957 with Caltrans and NVTA. This phase of work will further refine the build alterna(ves iden(fied during the PID, select a preferred build alterna(ve, and produce two key project deliverables - a Project Report securing Caltrans approval and an environmental document ensuring compliance with the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA).

On January 21, 2026, NVTA staff provided an update to the NVTA Board of Directors of the work completed to date as well as the recommended next steps in the PA&ED phase of the project. NVTA is now bringing the same detailed presenta(on to the American Canyon City Council for informa(on and feedback.

COUNCIL PRIORITY PROGRAMS AND PROJECTS
Transporta(on: "Improve the transporta(on network within the City to alleviate conges(on and enhance the quality of life for the community."

FISCAL IMPACT
There is no direct fiscal impact to the City at this time.

ENVIRONMENTAL REVIEW
None
ATTACHMENTS:

1. NVTA SR29 Presentation

2. CC RESOLUTION 2024-03 - ROUTE 29 COORIDOR IMPROVEMENT PROJECT

3. COOPERATIVE AGREEMENT #2024-03 - CALTRANS - NVTA
23 NVTA PROJECT UPDATE
AMERICAN CANYON SR-29

CORRIDOR IMPROVEMENTS
• February 3, 2026
• Grant Bailey, P.E.
• Program Manager - Engineer
24 2
American Canyon SR 29 Corridor
Purpose of Today’s Update • Status of Environmental Phase of Work • Traffic modeling and existing conditions Critical Milestone: Intersection Safety &
Operational Assessment Process (ISOAP)
completed December 2025
• Informs environmental and engineering
studies
• Target phase completion - December
2026
• Alternatives Evaluation • Initial Findings from Intersection Safety & Operational Assessment Process
(ISOAP) Analysis
• Led to more robust alternative
evaluation
• Additional Engagement • Presented this information to NVTA Board of Directors on January 21, 2026
25 3
American Canyon SR 29 Corridor
Project Purpose & Need
• Purpose
• Improve mobility for all modes
• Improve safety
• Improve transit travel time & reliability
• Support residential and commercial
development
• Need
• Corridor currently lacks:
• Multimodal connectivity
• Public transit facilities
• Low level-of-traffic stress routing options
• Intersection constrains lead to extensive
queuing & delays
• Number of collisions on the corridor exceeds
state average for similar facilities
26 4
American Canyon SR 29 Corridor
Project Alternatives
• No Build Alternative
• Conditions remain as-is
• Alternative 1:
• Signalization improvements and coordination
throughout corridor
• Business access and transit (BAT) lanes
• Transit priority/queue jump
• Alternative 2:
• Multilane roundabouts at six intersections
• American Canyon Rd will remain
signalized
• Work Common to Both Alternatives:
• Construct physically separated Class I shared
use path
• Lower speed limit from 50 MPH to 35 MPH
• Construct 4 bus stops or bus islands
• Construct mobility hub
• Reconfigure intersections to improve
pedestrian crossings
27 5
American Canyon SR 29 Corridor
Alternative #1 Advantages
• Traffic Operations & Intersection Level of Service
• Alternative 1 offers improved LOS
• Transit Reliability
• Business Access and Transit (BAT) Lanes
• Queue Jump Lanes
• ROW
• Limited property acquisitions and driveway
impacts
• Vehicle Miles Traveled (VMT)
• No increase in VMT
• Alternative #1 Supports:
• Transit reliability
• Emergency response times
• Limited ROW impacts
• Improved mobility for all modes (including
bikes/pedestrians)
28 6
American Canyon SR 29 Corridor
Alternative #2 Advantages
• Injury collision reduction potential
• Alternative 2 carries higher crash reduction
potential
• Local/public preference
• General sentiment from public workshop was
a preference for roundabouts
• Roundabout carry a public perception of
improved traffic flow
• Alternative #2 Supports
• Potentially reduced incidence of collision
• Improved mobility for all modes (including
bikes/pedestrians)
29 7
American Canyon SR 29 Corridor
Signalization Improvements
• Additional Signals
• Crawford Wy
• Poco Wy / S Napa Junction
• Side Street Improvements
• Additional Turning Lanes
• New Crosswalks across SR 29
• Signal Coordination
• Adaptative Signal Coordination
• Driven by actual vehicle volumes
• Why?
• Minimize side street delays and accommodate
future land use growth
• Regulate N-S vehicle throughput
• Transit Queue Jumps and Transit Signal Priority at
all signalized Intersections
• Easier and safer pedestrian crossings 30
8 American Canyon SR 29 Corridor
Business Access & Transit Lanes
Benefits:
• Transit
• Efficiently and reliably move transit vehicles through the corridor
• Couple with intersection queue jumps and transit signal priority (TSP) technology
• Local Access
• Acceleration/deceleration lane for commercial &
residential facilities along the corridor
• Improves operations between intersections
• Limits impacts to and consolidation of existing driveways • Standard Shoulder
• Accommodates vehicle breakdowns
• Enforcement
• Technology driven
• Signal-mounted enforcement cameras
• Potential for bus-mounted enforcement cameras
31 9
American Canyon SR 29 Corridor
Intersection Operation Evaluation Results
Intersection Level of Service (LOS)
Alternative 1 - Signals Alternative 2 - Roundabouts
Level of Service Existing Conditions
2025 AM (PM)
Opening Year 2030

AM (PM)
Design Year
2050 AM (PM)
Opening Year
2030 AM (PM)
Design Year
2050 AM (PM)
During Peak Period
Crawford Way B(F) C (B) B (B) B (C) C (E)
Donaldson Way C(C) C (C) C (D) F (E) F (F)
Poco Way/S Napa
Junction Rd E(D) A (D) A (F) F (C) F (E)
Rio Del Mar C(B) C (D) E (D) F (D) F (F)
Eucalyptus Dr B(B) A (C) E (E) F (E) F (F)
Napa Junction Rd D(E) D (C) D (D) F (E) F (F)
LOS Key
Average Delay
(seconds/vehicle)
Signalized Unsignalized
Acceptable
LOS
A-B-C Acceptable 0-25 0-25
D At Capacity 35-55 25-35
Unacceptable LOS
E Poor 55-80 35-50
F Failure >80 >50 32
10 American Canyon SR 29 Corridor
Alternative Evaluation
33 11
American Canyon SR 29 Corridor
Cost, Right of Way & Delivery
• Costs
• Alt 1: ~$58M (ROW & Construction)
• Alt 2: ~$75M (ROW & Construction)
• ROW
• Alt 1: minimal impacts to public right of way
and private property corners
• Alt 2: major acquisitions, potential structure
demolitions
• Alternative 2 Delivery Risk
• Limited use of three-lane roundabouts in
California
• No examples in the proposed configuration of
multiple consecutive roundabouts
• Potential VMT mitigation could increase costs
$0
$10
$20
$30
$40
$50
$60
$70
$80
Alternative 1 - Signals Alternative 2 - Roundabouts
CON - $55 M
CON - $65 M
ROW - $3 M
ROW - $10 M
Cost (Millions. 2025 $)
Cost, ROW & Delivery
Construction ROW
34 12
American Canyon SR 29 Corridor
Alternative Evaluation Results
Evaluation Criteria Contributing Factors Alternative 1 Alternative 2 Purpose and Need Alternative accomplishes points outlined in the purpose and need of the project. 1 1
Traffic
Better Intersection Level of Service
During Peak Period
1 0
Transit Better improves transit operations 1 0
Bike and Ped Better improves Pedestrian and Bike
Connectivity 0 0
VMT No VMT Increase 1 0
Safety
CMF Qualitative Analysis 0 1
Cost Lower Total Project Cost 1 0
Environmental Less environmental impacts 0 0
Department of Transportation Concerns Caltrans has less concerns related to nonstandard design 1 0
Local Preference Alternative preferred by users and local residents 0 1
City Preference Alternative preferred by City Council & Staff TBD TBD
Local Impacts
Less Temporary construction impacts 0 0
Less Right of Way impacts 1 0
Less Significant Driveway Impacts 1 0
TOTAL 8 3
35 13
American Canyon SR 29 Corridor
Next Steps
• Staff recommendation
• Carry forward Alternative #1 for
environmental clearance
• Do not carry Alternative #2 forward
• Benefits
• Accelerates phase completion to the end of
2026
• Limits use of additional resources to further
evaluate Alternative #2
36 Q&A – Thank you!
37 15
American Canyon SR 29 Corridor
LOS Table with No Build Conditions
Expanded Intersection Level of Service (LOS)
No Build Alternative Alternative 1 - Signals Alternative 2 - Roundabouts Level of Service Existing Conditions
2025 AM (PM)
Opening Year 2030

AM (PM)
Design Year 2050

AM (PM)
Opening Year
2030 AM (PM)
Design Year
2050 AM (PM)
Opening Year
2030 AM (PM)
Design Year 2050

AM (PM)
During Peak Period
Crawford Way B(F) F(F) F(E) C (B) B (B) B (C) C (E)
Donaldson Way C(C) D(C) F(D) C (C) C (D) F (E) F (F)
Poco Way/S Napa
Junction Rd E(D) F(E) F(F) A (D) A (F) F (C) F (E)
Rio Del Mar C(B) D(C) F(F) C (D) E (D) F (D) F (F)
Eucalyptus Dr B(B) B(B) F(F) A (C) E (E) F (E) F (F)
Napa Junction Rd D(E) D(F) F(F) D (C) D (D) F (E) F (F) LOS Key
Average Delay
(seconds/vehicle)
Signalized Unsignalized
Acceptable
LOS
A-B-C Acceptable 0-25 0-25
D At Capacity 35-55 25-35
Unacceptable LOS
E Poor 55-80 35-50
F Failure >80 >50
38 16
American Canyon SR 29 Corridor
Solano Napa Area Base Model (SNABM)
Sub-Area Mode
(Focus on Project Study Area)
Traffic Modeling Methodology
• Regional Model Covers All Counties.
• Focused on Solano and Napa Counties
• Project specific Sub-Area to capture major
changes in land use and traffic circulation.
• Model also includes the City of American
Canyon General Plan changes and growth
projections.
• i.e. Watson Ranch Development
• Developed regional and local volumes.
39 RESOLUTION NO. 2024-03
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE COOPERATIVE AGREEMENT 04-2957

WITH CALTRANS AND NAPA VALLEY TRANSPORTATION AUTHORITY FOR PROJECT APPROVAL AND

ENVIRONMENTAL DOCUMENT PHASE SERVICES ASSOCIATED WITH THE AMERICAN CANYON STATE ROUTE 29 CORRIDOR IMPROVEMENT PROJECT
WHEREAS, the Napa Valley Transportation Authority (NVTA), in cooperation with the California Department of Transportation (Caltrans) and the City of American Canyon (City), proposes roadway improvements along State Route 29 (SR 29) within much of the City limits to address various operational and safety needs along the SR 29 corridor; and
WHEREAS, the proposed SR29 corridor improvements will include transit, bicycle, pedestrian infrastructure and beautification; and
WHEREAS, in 2023 Caltrans and NVTA completed a project initiation document (PID) focusing on a segment of the SR 29 corridor in American Canyon between Napa Junction Road and American Canyon Road;and
WHEREAS, the next stage of project development is the Project Approval and Environmental Document (PA&ED) phase. This phase of work will further refine the build alternatives identified during the PID, select a preferred build alternative, and produce two key project deliverables - a Project Report securing Caltrans approval and an environmental document ensuring compliance with the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA); and WHEREAS, when a project exists in Caltrans right of way, a cooperative agreement is necessary between all partes to define roles and responsibilities around project delivery, funding and oversight; and WHEREAS, NVTA will be taking lead on the project with Caltrans in regard to establishing the scope of work and securing financial resources to fund the work while the City's responsibilities, as outlined in the agreement, will be primarily focused on project coordination with NVTA, community outreach, public meetings, and circulation of environmental documentation; and WHEREAS, in Cooperative Agreement 04-2957 Caltrans will commit $955,000 of settlement funding previously paid by the City to Caltrans pursuant to a 2006 Settlement Agreement and Release to support the PA&ED phase of the project; and
WHEREAS, NVTA has secured and committed an additional $750,000 in Regional Measure 3 funding and $3,000,000 in One Bay Areas Grant Cycle 3 funding for a total budget of $4,705,000; and WHEREAS, planned expenditures for the PA&ED phase of the project are not anticipated to exceed $4,683,632.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of American Canyon hereby authorizes the City Manager to execute Cooperative Agreement 04-2957 with Caltrans and Napa Valley 40 Transportation Authority for Project Approval and Environmental Document phase services associated with the American Canyon State Route 29 Corridor Improvement Project.

PASSED, APPROVED and ADOPTED at a regularly scheduled meeting of the City Council of the City of American Canyon held on the 16th day of January, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

Council Members Aboudamous, Joseph, Washington, Vice Mayor Oro, and Mayor Garcia None
None
None
Leon Garcia, Mayor
APPROVE AS TO FORM:
k~D~
William D. Ross, City Attorney
2 41
Agreement 04-2957
Project No. 0419000297
EA 4Q010
04-NAP-29-0.6/2.1
Project Development Agreement 2017-02-17 (Created September 25, 2023) i

COOPERATIVE AGREEMENT COVER SHEET
Work Description
SR 29 AMERICAN CANYON MULTI-MODAL CORRIDOR IMPROVEMENT PROJECT WOULD MAKE ROADWAY IMPROVEMENTS ALONG STATE ROUTE 29 (SR 29) BETWEEN POST MILES 0.69 AND 2.05. PROPOSED IMPROVEMENTS INCLUDE TRANSIT, BICYCLE AND PEDESTRIAN INFRASTRUCTURE. THREE ALTERNATIVES WERE

DEVELOPED DURING THE PROJECT STUDY REPORT-PROJECT DEVELOPMENT SUPPORT PHASE, 2 BUILD AND 1 NO BUILD. BUILD ALTERNATIVE 1 EVALUATES

IMPROVEMENT OF EXISTING SIGNALIZED INTERSECTIONS INCLUDING SIGNAL

OPERATIONAL IMPROVEMENTS, ADAPTIVE TECHNOLOGY, AND QUEUE JUMPS WITH AUXILIARY LANES. BUILD ALTERNATIVE 2 EVALUATES INTERSECTION

OPERATIONAL IMPROVEMENTS BY REPLACING EXISTING SIGNALIZED INTERSECTIONS WITH ROUNDABOUTS. STREET BEAUTIFICATION, BIKE AND

PEDESTRIAN INFRASTRUCTURE, AND SIGNAGE AND WAYFINDING IMPROVEMENTS

ARE PROPOSED UNDER BOTH BUILD ALTERNATIVES
City of American Canyon
Agreement # 2024-03
42 Cover Sheet AGREEMENT 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) ii Contact Information

CALTRANS
Amani Meligy, Regional Project Manager for Napa County
111 Grand Avenue
Oakland, CA 94612
Office Phone: (510) 286-5103
Email: [email protected]

NAPA VALLEY TRANSPORTATION AUTHORITY
Danielle Schmitz, Capital Development & Planning
625 Burnell Street
Napa, CA 94559
Office Phone: (707) 259-5968
Email: [email protected]

CITY OF AMERICAN CANYON
Erica Ahmann Smithies, Public Works Director
Napa, CA 94559
Office Phone: (707) 647-4360
Email: [email protected]
43 Agreement 04-2957
Project No. 0419000297
EA 4Q010
04-NAP-29-0.6/2.1
Project Development Agreement 2017-02-17 (Created September 25, 2023) 1 of 20

COOPERATIVE AGREEMENT
This AGREEMENT, executed on and effective from _______________________________, is between the State of California, acting through its Department of Transportation, referred to as CALTRANS, and:

Napa Valley Transportation Authority, a California joint powers authority, referred to hereinafter as NVTA; and
City of American Canyon, a public corporation/entity, referred to hereinafter as CITY.

An individual signatory agency in this AGREEMENT is referred to as a PARTY. Collectively, the signatory agencies in this AGREEMENT are referred to as PARTIES.

RECITALS

1. PARTIES are authorized to enter into a cooperative agreement for improvements to the State Highway System per the California Streets and Highways Code, Sections 114 and 130.

2. For the purpose of this AGREEMENT, SR 29 American Canyon Multi-modal Corridor Improvement Project would make roadway improvements along State Route 29 (SR 29) between Post miles 0.69 and 2.05. Proposed improvements include transit, bicycle and pedestrian infrastructure. Three alternatives were developed during the Project Study ReportProject Development Support phase, 2 build and 1 no build. Build alternative 1 evaluates improvement of existing signalized intersections including signal operational improvements, adaptive technology, and queue jumps with auxiliary lanes. Build alternative 2 evaluates intersection operational improvements by replacing existing signalized intersections with roundabouts. Street beautification, bike and pedestrian infrastructure, and signage and wayfinding improvements are proposed under both build alternatives will be referred to hereinafter as PROJECT. The PROJECT scope of work is defined in the project initiation and approval documents (e.g. Project Study Report, Design Engineering Evaluation Report, or Project Report).

3. All obligations and responsibilities assigned in this AGREEMENT to complete the following PROJECT COMPONENT will be referred to hereinafter as WORK:

PROJECT APPROVAL AND ENVIRONMENTAL DOCUMENT (PA&ED)
Each PROJECT COMPONENT is defined in the CALTRANS Workplan Standards Guide as a distinct group of activities/products in the project planning and development process.

February 29, 2024
•
44 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 2 of 20

4. The term AGREEMENT, as used herein, includes this document and any attachments, exhibits, and amendments.

This AGREEMENT is separate from and does not modify or replace any other cooperative agreement or memorandum of understanding between the PARTIES regarding the PROJECT.

PARTIES intend this AGREEMENT to be their final expression that supersedes any oral understanding or writings pertaining to the WORK. The requirements of this AGREEMENT will preside over any conflicting requirements in any documents that are made an express part of this AGREEMENT.

If any provisions in this AGREEMENT are found by a court of competent jurisdiction to be, or are in fact, illegal, inoperative, or unenforceable, those provisions do not render any or all other AGREEMENT provisions invalid, inoperative, or unenforceable, and those provisions will be automatically severed from this AGREEMENT.

Except as otherwise provided in the AGREEMENT, PARTIES will execute a written amendment if there are any changes to the terms of this AGREEMENT.

PARTIES agree to sign a CLOSURE STATEMENT to terminate this AGREEMENT.

However, all indemnification, document retention, audit, claims, environmental commitment, legal challenge, maintenance and ownership articles will remain in effect until terminated or modified in writing by mutual agreement or expire by the statute of limitations.

5. No PROJECT deliverables have been completed prior to this AGREEMENT.

6. In this AGREEMENT capitalized words represent defined terms, initialisms, or acronyms.

7. PARTIES hereby set forth the terms, covenants, and conditions of this AGREEMENT.

RESPONSIBILITIES
Sponsorship

8. A SPONSOR is responsible for establishing the scope of the PROJECT and securing the financial resources to fund the WORK. A SPONSOR is responsible for securing additional funds when necessary or implementing PROJECT changes to ensure the WORK can be completed with the funds committed in this AGREEMENT.

PROJECT changes, as described in the CALTRANS Project Development Procedures Manual, will be approved by CALTRANS as the owner/operator of the State Highway System.

9. NVTA is the SPONSOR for the WORK in this AGREEMENT.
45 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 3 of 20 Implementing Agency

10. The IMPLEMENTING AGENCY is the PARTY responsible for managing the scope, cost, schedule, and quality of the work activities and products of a PROJECT COMPONENT.

NVTA is the Project Approval and Environmental Document (PA&ED) IMPLEMENTING AGENCY.

PA&ED includes the completion of the Final Environmental Document and the Project Report (documenting the project alternative selection).

11. NVTA will provide a Quality Management Plan (QMP) for the WORK in every PROJECT COMPONENT that they are implementing. The QMP describes the IMPLEMENTING AGENCY’s quality policy and how it will be used. The QMP will include a process for resolving disputes between the PARTIES at the team level. The QMP is subject to CALTRANS review and concurrence.

12. Any PARTY responsible for completing WORK will make its personnel and consultants that prepare WORK available to help resolve WORK-related problems and changes for the entire duration of the PROJECT including PROJECT work that may occur under separate agreements.

Funding

13. Funding sources, PARTIES committing funds, funding amounts, and invoicing/payment details are documented in the Funding Summary section of this AGREEMENT.

PARTIES will amend this AGREEMENT by updating and replacing the Funding Summary, in its entirety, each time the funding details change. Funding Summary replacements will be executed by a legally authorized representative of the respective PARTIES. The most current fully executed Funding Summary supersedes any previous Funding Summary created for this AGREEMENT.

14. PARTIES will not be reimbursed for costs beyond the funding commitments in this AGREEMENT.

15. Unless otherwise documented in the Funding Summary, overall liability for project costs within a PROJECT COMPONENT, subject to program limitations, will be in proportion to the amount contributed to that PROJECT COMPONENT by each fund type.

16. Unless otherwise documented in the Funding Summary, any savings recognized within a PROJECT COMPONENT will be credited or reimbursed, when allowed by policy or law, in proportion to the amount contributed to that PROJECT COMPONENT by each fund type. •
46 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 4 of 20

17. WORK costs, except those that are specifically excluded in this AGREEMENT, are to be paid from the funds obligated in the Funding Summary. Costs that are specifically excluded from the funds obligated in this AGREEMENT are to be paid by the PARTY incurring the costs from funds that are independent of this AGREEMENT.

CALTRANS’ Quality Management

18. CALTRANS, as the owner/operator of the State Highway System (SHS), will perform quality management work including Quality Management Assessment (QMA) and owner/operator approvals for the portions of WORK within the existing and proposed SHS right-of-way.

19. CALTRANS’ Quality Management Assessment (QMA) efforts are to ensure that NVTA's quality assurance results in WORK that is in accordance with the applicable standards and the PROJECT’s quality management plan (QMP). QMA does not include any efforts necessary to develop or deliver WORK or any validation by verifying or rechecking WORK.

When CALTRANS performs QMA, it does so for its own benefit. No one can assign liability to CALTRANS due to its QMA.

20. CALTRANS, as the owner/operator of the State Highway System, will approve WORK products in accordance with CALTRANS policies and guidance and as indicated in this AGREEMENT.

21. Per National Environmental Policy Act (NEPA) assignment and California Environmental Quality Act (CEQA) statutes, CALTRANS will perform environmental document quality control and NEPA assignment review procedures for environmental documentation.

CALTRANS quality control and quality assurance procedures for all environmental documents are described in Chapter 38 of the Standard Environmental Reference (SER), available at https://dot.ca.gov/programs/environmental-analysis/standard-environmental-referenceser/volume-1-guidance-for-compliance/ch-38-nepa-assignment. This also includes the independent judgment analysis and determination under CEQA that the environmental documentation meets CEQA requirements.

22. NVTA will provide WORK-related products and supporting documentation upon CALTRANS’ request for the purpose of CALTRANS’ quality management work. 47 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 5 of 20

23. NVTA and CITY, including any employee, agent, consultant or sub-consultant retained by the NVTA and CITY, shall implement uniform document control policies necessary to retain all records and electronically stored information associated with the WORK, including but not limited to those records identified in California Public Resources Code, Section 21167.6, and including email and attachments, in a manner consistent with the CALTRANS Uniform Filing System and the “Final Caltrans Environmental Records Retention Policy”, available at https://dot.ca.gov/-/media/dot-media/programs/environmental-analysis/documents/ser/neparecordretention-policy-final-a11y.pdf. These records, along with an index of the records, shall be provided to CALTRANS within 60 days of CALTRANS’ written request.

CEQA/NEPA Lead Agency

24. NVTA is the CEQA Lead Agency for the PROJECT.

25. CALTRANS is a CEQA Responsible Agency for the PROJECT.

26. CALTRANS is the NEPA Lead Agency for the PROJECT.

Environmental Permits, Approvals and Agreements

27. PARTIES will comply with the commitments and conditions set forth in the environmental documentation, environmental permits, approvals, and applicable agreements as those commitments and conditions apply to each PARTY’s responsibilities in this AGREEMENT.

28. Unless otherwise assigned in this AGREEMENT, the IMPLEMENTING AGENCY for a PROJECT COMPONENT is responsible for all PROJECT COMPONENT WORK associated with coordinating, obtaining, implementing, renewing, and amending the PROJECT permits, agreements, and approvals whether they are identified in the planned project scope of work or become necessary in the course of completing the PROJECT.

29. It is expected that the PROJECT requires the following environmental permits/approvals:

ENVIRONMENTAL PERMITS/REQUIREMENTS
404, US Army Corps Of Engineers
401, Regional Water Quality Control Board
National Pollutant Discharge Elimination System (NPDES), State Water Resources Control Board
48 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 6 of 20 Project Approval and Environmental Document (PA&ED)

30. As the PA&ED IMPLEMENTING AGENCY, NVTA is responsible for all PA&ED WORK except those activities and responsibilities that are assigned to another PARTY and those activities that are excluded under this AGREEMENT.

31. CALTRANS will be responsible for completing the following PA&ED activities:

CALTRANS Work Breakdown Structure Identifier (If Applicable) AGREEMENT Funded Cost
100.10.10.xx Quality Management No
165.15.15.xx Essential Fish Habitat Consultation Yes
165.15.15.xx Section 7 Consultation Yes
165.25.25 Approval to Circulate Resolution Yes
180.10.05.45 Section 7 Consultation Yes
180.15.05 Record of Decision (NEPA) Yes

32. Any PARTY preparing environmental documentation, including studies and reports, will ensure that qualified personnel remain available to help resolve environmental issues and perform any necessary work to ensure that the PROJECT remains in environmental compliance.

33. NVTA will provide written notice of the initiation of environmental studies to the NEPA Lead Agency prior to completing any other PA&ED phase work.

California Environmental Quality Act (CEQA)

34. The CEQA Lead Agency will determine the type of CEQA documentation and will cause that documentation to be prepared in accordance with CEQA requirements.

35. Any PARTY involved in the preparation of CEQA documentation will prepare the documentation to meet CEQA requirements and follow the CEQA Lead Agency’s standards that apply to the CEQA process.
49 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 7 of 20

36. CALTRANS is a CEQA Responsible Agency for the PROJECT and is responsible for review, comment, and concurrence on all environmental documentation (including, but not limited to, studies, reports, public notices, and public meeting materials, determinations, administrative drafts, and final environmental documents) at appropriate stages of development prior to approval and public availability.

37. Any PARTY preparing any portion of the CEQA documentation, including any studies and reports, will submit that portion of the documentation to the CEQA Lead Agency for review, comment, and approval at appropriate stages of development prior to public availability.

38. If the CEQA Lead Agency makes any changes to the CEQA documentation, the CEQA Lead Agency will allow CALTRANS to review, comment, and concur on those changes prior to the CEQA Lead Agency’s approval at appropriate stages of development prior to public availability.

39. If the CEQA Lead Agency makes any changes to CEQA-related public notices, then the CEQA Lead Agency will allow CALTRANS to review, comment, and concur on those changes prior to publication and circulation.

40. The CEQA Lead Agency will attend all CEQA-related public meetings.

41. If a PARTY who is not the CEQA Lead Agency holds a public meeting about the PROJECT, that PARTY must clearly state its role in the PROJECT and the identity of the CEQA Lead Agency on all meeting publications. All meeting publications must also inform the attendees that public comments collected at the meetings are not part of the CEQA public review process.

That PARTY will submit all meeting advertisements, agendas, exhibits, handouts, and materials to the CEQA Lead Agency for review, comment, and approval at least ten (10) working days prior to publication or use. If that PARTY makes any changes to the materials, it will allow the CEQA Lead Agency to review, comment on, and approve those changes at least three (3) working days prior to the public meeting date.

The CEQA Lead Agency maintains final editorial control with respect to text or graphics that could lead to public confusion over CEQA-related roles and responsibilities. -
50 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 8 of 20 National Environmental Policy Act (NEPA)

42. Pursuant to Chapter 3 of Title 23, United States Code, Sections 326 and 327, CALTRANS is the NEPA Lead Agency for the PROJECT. CALTRANS is responsible for NEPA compliance, will determine the type of NEPA documentation, and will cause that documentation to be prepared in accordance with NEPA requirements.

CALTRANS, as the NEPA Lead Agency for PROJECT, is responsible for the review, comment, and approval of all environmental documentation (including, but not limited to, studies, reports, public notices, and public meeting materials, determinations, administrative drafts, and final environmental documents) at appropriate stages of development prior to approval and public availability.

When required as NEPA Lead Agency, CALTRANS will conduct consultation and coordination and obtain, renew, or amend approvals pursuant to the Federal Endangered Species Act, and Essential Fish Habitat.

When required as NEPA Lead Agency, CALTRANS will conduct consultation and coordination approvals pursuant to Section 106 of the National Historic Preservation Act.

43. Any PARTY involved in the preparation of NEPA documentation will follow FHWA and CALTRANS standards that apply to the NEPA process including, but not limited to, the guidance provided in the FHWA Environmental Toolkit (available at http://environment.fhwa.dot.gov/index.asp) and the CALTRANS Standard Environmental Reference.

44. Any PARTY preparing any portion of the NEPA documentation (including, but not limited to, studies, reports, public notices, and public meeting materials, determinations, administrative drafts, and final environmental documents) will submit that portion of the documentation to CALTRANS for CALTRANS’ review, comment, and approval prior to public availability.

45. NVTA and CITY will prepare, publicize, and circulate all NEPA-related public notices, except Federal Register notices. NVTA will submit all notices to CALTRANS for CALTRANS’ review, comment, and approval prior to publication and circulation.

CALTRANS will work with the appropriate federal agency to publish notices in the Federal Register.

46. The NEPA Lead Agency will attend all NEPA-related public meetings.

47. NVTA and CITY will submit all NEPA-related public meeting materials to CALTRANS for CALTRANS’ review, comment, and approval at least ten (10) working days prior to the public meeting date.
51 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 9 of 20

48. If a PARTY who is not the NEPA Lead Agency holds a public meeting about the PROJECT, that PARTY must clearly state its role in the PROJECT and the identity of the NEPA Lead Agency on all meeting publications. All meeting publications must also inform the attendees that public comments collected at the meetings are not part of the NEPA public review process.

That PARTY will submit all meeting advertisements, agendas, exhibits, handouts, and materials to the NEPA Lead Agency for review, comment, and approval at least ten (10) working days prior to publication or use. If that PARTY makes any changes to the materials, it will allow the NEPA Lead Agency to review, comment on, and approve those changes at least three (3) working days prior to the public meeting date.

The NEPA Lead Agency has final approval authority with respect to text or graphics that could lead to public confusion over NEPA-related roles and responsibilities.

49. NVTA and CITY will ensure that the PROJECT is included in the approved Federal Statewide Transportation Improvement Program (FSTIP) prior to the NEPA Lead Agency’s approval of the environmental document.

Schedule

50. PARTIES will manage the WORK schedule to ensure the timely use of committed funds and to ensure compliance with any environmental permits, right-of-way agreements, construction contracts, and any other commitments. PARTIES will communicate schedule risks or changes as soon as they are identified and will actively manage and mitigate schedule risks.

51. The IMPLEMENTING AGENCY for each PROJECT COMPONENT will furnish PARTIES with written monthly progress reports during the completion of the WORK. 52 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 10 of 20 Additional Provisions
Standards

52. PARTIES will perform all WORK in accordance with federal and California laws, regulations, and standards; Federal Highway Administration (FHWA) standards; and CALTRANS standards. CALTRANS standards include, but are not limited to, the guidance provided in the:

CADD Users Manual
CALTRANS policies and directives
Plans Preparation Manual
Project Development Procedures Manual (PDPM)
Workplan Standards Guide
Standard Environmental Reference
Highway Design Manual
Encroachment Permits Manual
Noncompliant Work

53. CALTRANS retains the right to reject noncompliant WORK. NVTA agrees to suspend WORK upon request by CALTRANS for the purpose of protecting public safety, preserving property rights, and ensuring that all WORK is in the best interest of the State Highway System.

Qualifications

54. Each PARTY will ensure that personnel participating in WORK are appropriately qualified or licensed to perform the tasks assigned to them.

Consultant Selection

55. NVTA and CITY will invite CALTRANS to participate in the selection of any consultants that participate in the WORK.
•
•
•
•
•
•
•
•
53 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 11 of 20 Encroachment Permits

56. CALTRANS will issue, upon proper application, the encroachment permits required for WORK within State Highway System (SHS) right-of-way. NVTA, CITY, their contractors, consultants, agents, and utility owners will not work within the SHS right-of-way without an encroachment permit which specifically allows them to do so. CALTRANS will provide encroachment permits to NVTA and CITY at no cost. CALTRANS will provide encroachment permits to utility owners at no cost. If the encroachment permit and this AGREEMENT conflict, the requirements of this AGREEMENT will prevail.

57. The IMPLEMENTING AGENCY for a PROJECT COMPONENT will coordinate, prepare, obtain, implement, renew, and amend any encroachment permits needed to complete the WORK.

Protected Resources

58. If any PARTY discovers unanticipated cultural, archaeological, paleontological, or other protected resources during WORK, all WORK in that area will stop and that PARTY will notify all PARTIES within 24 hours of discovery. WORK may only resume after a qualified professional has evaluated the nature and significance of the discovery and CALTRANS approves a plan for its removal or protection.

Disclosures

59. PARTIES will hold all administrative drafts and administrative final reports, studies, materials, and documentation relied upon, produced, created, or utilized for the WORK in confidence to the extent permitted by law and where applicable, the provisions of California Government Code, Section 7921.505(c)(5) will protect the confidentiality of such documents in the event that said documents are shared between PARTIES.

PARTIES will not distribute, release, or share said documents with anyone other than employees, agents, and consultants who require access to complete the WORK without the written consent of the PARTY authorized to release them, unless required or authorized to do so by law.

60. If a PARTY receives a public records request pertaining to the WORK, that PARTY will notify PARTIES within five (5) working days of receipt and make PARTIES aware of any disclosed public records.
54 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 12 of 20 Hazardous Materials

61. HM-1 is hazardous material (including, but not limited to, hazardous waste) that may require removal and disposal pursuant to federal or state law, irrespective of whether it is disturbed by the PROJECT or not.

HM-2 is hazardous material (including, but not limited to, hazardous waste) that may require removal and disposal pursuant to federal or state law only if disturbed by the PROJECT.

The management activities related to HM-1 and HM-2, including and without limitation, any necessary manifest requirements and disposal facility designations are referred to herein as HM-1 MANAGEMENT and HM-2 MANAGEMENT respectively.

62. If HM-1 or HM-2 is found the discovering PARTY will immediately notify all other PARTIES.

63. CALTRANS, independent of the PROJECT, is responsible for any HM-1 found within the existing State Highway System right-of-way. CALTRANS will undertake, or cause to be undertaken, HM-1 MANAGEMENT with minimum impact to the PROJECT schedule.

CALTRANS will pay, or cause to be paid, the cost of HM-1 MANAGEMENT for HM-1 found within the existing State Highway System right-of-way with funds that are independent of the funds committed in this AGREEMENT.

64. If HM-1 is found within the PROJECT limits and outside the existing State Highway System right-of-way, responsibility for such HM-1 rests with the owner(s) of the parcel(s) on which the HM-1 is found. NVTA, in concert with the local agency having land use jurisdiction, will ensure that HM-1 MANAGEMENT is undertaken with minimum impact to PROJECT schedule.

The cost of HM-1 MANAGEMENT for HM-1 found within the PROJECT limits and outside the existing State Highway System right-of-way will be paid from funds that are independent of the funds committed in this AGREEMENT and will be the responsibility of the owner(s) of the parcel(s) where the HM-1 is located.

65. The CONSTRUCTION IMPLEMENTING AGENCY is responsible for HM 2 MANAGEMENT within the PROJECT limits.
55 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 13 of 20 NVTA, CITY and CALTRANS will comply with the Soil Management Agreement for Aerially Deposited Lead Contaminated Soils (Soil Management Agreement) executed between CALTRANS and the California Department of Toxic Substances Control (DTSC). Under Section 3.2 of the Soil Management Agreement, CALTRANS and NVTA each retain joint and severable liability for noncompliance with the provisions of the Soil Management Agreement.

NVTA will assume all responsibilities assigned to CALTRANS in the Soil Management Agreement during PROJECT COMPONENTS for which they are the IMPLEMENTING AGENCY except for final placement and burial of soil within the State right-of-way, per Section 4.5 of the Soil Management Agreement, which is subject to CALTRANS concurrence and reporting to DTSC which will be performed by CALTRANS.

66. CALTRANS’ acquisition or acceptance of title to any property on which any HM-1 or HM-2 is found will proceed in accordance with CALTRANS’ policy on such acquisition.

Claims

67. Any PARTY that is responsible for completing WORK may accept, reject, compromise, settle, or litigate claims arising from the WORK without concurrence from the other PARTY.

68. PARTIES will confer on any claim that may affect the WORK or PARTIES’ liability or responsibility under this AGREEMENT in order to retain resolution possibilities for potential future claims. No PARTY will prejudice the rights of another PARTY until after PARTIES confer on the claim.

69. If the WORK expends state or federal funds, each PARTY will comply with the Federal Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards of 2 CFR, Part 200. PARTIES will ensure that any for-profit consultant hired to participate in the WORK will comply with the requirements in 48 CFR, Chapter 1, Part 31.

When state or federal funds are expended on the WORK these principles and requirements apply to all funding types included in this AGREEMENT.

Accounting and Audits

70. PARTIES will maintain, and will ensure that any consultant hired by PARTIES to participate in WORK will maintain, a financial management system that conforms to Generally Accepted Accounting Principles (GAAP), and that can properly accumulate and segregate incurred PROJECT costs and billings.
56 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 14 of 20

71. PARTIES will maintain and make available to each other all WORK-related documents, including financial data, during the term of this AGREEMENT.

PARTIES will retain all WORK-related records for three (3) years after the final voucher.

PARTIES will require that any consultants hired to participate in the WORK will comply with this Article.

72. PARTIES have the right to audit each other in accordance with generally accepted governmental audit standards.

CALTRANS, the State Auditor, FHWA (if the PROJECT utilizes federal funds), and NVTA will have access to all WORK -related records of each PARTY, and any consultant hired by a PARTY to participate in WORK, for audit, examination, excerpt, or transcription.

The examination of any records will take place in the offices and locations where said records are generated and/or stored and will be accomplished during reasonable hours of operation.

The auditing PARTY will be permitted to make copies of any WORK-related records needed for the audit.

The audited PARTY will review the draft audit, findings, and recommendations, and provide written comments within thirty (30) calendar days of receipt.

Upon completion of the final audit, PARTIES have forty-five (45) calendar days to refund or invoice as necessary in order to satisfy the obligation of the audit.

Any audit dispute not resolved by PARTIES is subject to mediation. Mediation will follow the process described in the General Conditions section of this AGREEMENT.

73. If the WORK expends state or federal funds, each PARTY will undergo an annual audit in accordance with the Single Audit Act in the Federal Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards as defined in 2 CFR, Part 200.

74. When a PARTY reimburses a consultant for WORK with state or federal funds, the procurement of the consultant and the consultant overhead costs will be in accordance with the Local Assistance Procedures Manual, Chapter 10.

Interruption of Work

75. If WORK stops for any reason, IMPLEMENTING AGENCY will place the PROJECT rightof-way in a safe and operable condition acceptable to CALTRANS. 57 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 15 of 20

76. If WORK stops for any reason, each PARTY will continue with environmental commitments included in the environmental documentation, permits, agreements, or approvals that are in effect at the time that WORK stops, and will keep the PROJECT in environmental compliance until WORK resumes.

Penalties, Judgments and Settlements

77. The cost of awards, judgments, fines, interest, penalties, attorney’s fees, and/or settlements generated by the WORK are considered WORK costs.

78. The cost of legal challenges to the environmental process or documentation are considered WORK costs.

79. Any PARTY whose action or lack of action causes the levy of fines, interest, or penalties will indemnify and hold all other PARTIES harmless per the terms of this AGREEMENT.

Project Files

80. NVTA and CITY will furnish CALTRANS with the Project History Files related to the PROJECT facilities on State Highway System within sixty (60) days following the completion of each PROJECT COMPONENT. NVTA will assure that the Project History File is prepared and submitted in compliance with the Project Development Procedures Manual, Chapter 7. All material will be submitted neatly in a three-ring binder and in PDF format.

GENERAL CONDITIONS

81. All portions of this AGREEMENT, including the Recitals Section, are enforceable.

Venue

82. PARTIES understand that this AGREEMENT is in accordance with and governed by the Constitution and laws of the State of California. This AGREEMENT will be enforceable in the State of California. Any PARTY initiating legal action arising from this AGREEMENT will file and maintain that legal action in the Superior Court of the county in which the CALTRANS district office that is signatory to this AGREEMENT resides, or in the Superior Court of the county in which the PROJECT is physically located.

Exemptions

83. All CALTRANS’ obligations and commitments under this AGREEMENT are subject to the appropriation of resources by the Legislature, the State Budget Act authority, programming and allocation of funds by the California Transportation Commission (CTC). 58 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 16 of 20 Indemnification

84. Neither CALTRANS, CITY nor any of its officers and employees, are responsible for any injury, damage, or liability occurring by reason of anything done or omitted to be done by NVTA, its contractors, sub-contractors, and/or its agents under or in connection with any work, authority, or jurisdiction conferred upon NVTA under this AGREEMENT. It is understood and agreed that NVTA, to the extent permitted by law, will defend, indemnify, and save harmless CALTRANS, CITY and all of their officers and employees from all claims, suits, or actions of every name, kind, and description brought forth under, but not limited to, tortious, contractual, inverse condemnation, or other theories and assertions of liability occurring by reason of anything done or omitted to be done by NVTA, its contractors, sub-contractors, and/or its agents under this AGREEMENT.

85. Neither NVTA, CITY nor any of its officers and employees, are responsible for any injury, damage, or liability occurring by reason of anything done or omitted to be done by CALTRANS, its contractors, sub-contractors, and/or its agents under or in connection with any work, authority, or jurisdiction conferred upon CALTRANS under this AGREEMENT. It is understood and agreed that CALTRANS, to the extent permitted by law, will defend, indemnify, and save harmless NVTA, CITY and all of their officers and employees from all claims, suits, or actions of every name, kind, and description brought forth under, but not limited to, tortious, contractual, inverse condemnation, or other theories and assertions of liability occurring by reason of anything done or omitted to be done by CALTRANS, its contractors, sub-contractors, and/or its agents under this AGREEMENT.

86. Neither CALTRANS, NVTA nor any of its officers and employees, are responsible for any injury, damage, or liability occurring by reason of anything done or omitted to be done by CITY, it’s contractors, sub-contractors, and/or its agents under or in connection with any work, authority, or jurisdiction conferred upon CALTRANS under this AGREEMENT. It is understood and agreed that CITY, to the extent permitted by law, will defend, indemnify, and save harmless CALTRANS, NVTA and all of their officers and employees from all claims, suits, or actions of every name, kind, and description brought forth under, but not limited to, tortious, contractual, inverse condemnation, or other theories and assertations of liability occurring by reason of anything done or omitted to be done by CITY, its contractors, subcontractors, and/or its agents under this AGREEMENT.

Non-parties

87. PARTIES do not intend this AGREEMENT to create a third party beneficiary or define duties, obligations, or rights for entities not signatory to this AGREEMENT. PARTIES do not intend this AGREEMENT to affect their legal liability by imposing any standard of care for fulfilling the WORK different from the standards imposed by law.
59 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 17 of 20

88. PARTIES will not assign or attempt to assign obligations to entities not signatory to this AGREEMENT without an amendment to this AGREEMENT.

Ambiguity and Performance

89. Neither PARTY will interpret any ambiguity contained in this AGREEMENT against the other PARTY. PARTIES waive the provisions of California Civil Code, Section 1654.

A waiver of a PARTY’s performance under this AGREEMENT will not constitute a continuous waiver of any other provision.

90. A delay or omission to exercise a right or power due to a default does not negate the use of that right or power in the future when deemed necessary.

Defaults

91. If any PARTY defaults in its performance of the WORK, a non-defaulting PARTY will request in writing that the default be remedied within thirty (30) calendar days. If the defaulting PARTY fails to do so, the non-defaulting PARTY may initiate dispute resolution.

Dispute Resolution

92. PARTIES will first attempt to resolve AGREEMENT disputes at the PROJECT team level as described in the Quality Management Plan. If they cannot resolve the dispute themselves, the CALTRANS District Director and the Executive Officer of NVTA will attempt to negotiate a resolution. If PARTIES do not reach a resolution, PARTIES’ legal counsel will initiate mediation. PARTIES agree to participate in mediation in good faith and will share equally in its costs.

Neither the dispute nor the mediation process relieves PARTIES from full and timely performance of the WORK in accordance with the terms of this AGREEMENT. However, if any PARTY stops fulfilling its obligations, any other PARTY may seek equitable relief to ensure that the WORK continues.

Except for equitable relief, no PARTY may file a civil complaint until after mediation, or forty-five (45) calendar days after filing the written mediation request, whichever occurs first.

PARTIES will file any civil complaints in the Superior Court of the county in which the CALTRANS District Office signatory to this AGREEMENT resides or in the Superior Court of the county in which the PROJECT is physically located.

93. PARTIES maintain the ability to pursue alternative or additional dispute remedies if a previously selected remedy does not achieve resolution. 60 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 18 of 20 Prevailing Wage

94. When WORK falls within the Labor Code § 1720(a)(1) definition of "public works" in that it is construction, alteration, demolition, installation, or repair; or maintenance work under Labor Code § 1771, PARTIES will conform to the provisions of Labor Code §§ 1720-1815, and all applicable provisions of California Code of Regulations, Title 8, Division 1, Chapter 8, Subchapter 3, Articles 1-7. PARTIES will include prevailing wage requirements in contracts for public work and require contractors to include the same prevailing wage requirements in all subcontracts.

Work performed by a PARTY’s own employees is exempt from the Labor Code's Prevailing Wage requirements.

If WORK is paid for, in whole or part, with federal funds and is of the type of work subject to federal prevailing wage requirements, PARTIES will conform to the provisions of the DavisBacon and Related Acts, 40 U.S.C. §§ 3141-3148.

When applicable, PARTIES will include federal prevailing wage requirements in contracts for public works. WORK performed by a PARTY’s employees is exempt from federal prevailing wage requirements.
61 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 19 of 20

SIGNATURES
PARTIES are authorized to enter into this AGREEMENT and have delegated to the undersigned the authority to execute this AGREEMENT on behalf of the respective agencies and hereby covenants to have followed all the necessary legal requirements to validly execute this AGREEMENT. By signing below, the PARTIES each expressly agree to execute this AGREEMENT electronically.

The PARTIES acknowledge that executed copies of this AGREEMENT may be exchanged by facsimile or email, and that such copies shall be deemed to be effective as originals.

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION
Robert Effinger
Acting Deputy District Director, Design
Verification of funds and authority:

Jeffrey Kuehnel
District Budget Manager
Certified as to financial terms and policies:

Nadine Karavan
HQ Accounting Supervisor

NAPA VALLEY TRANSPORTATION

AUTHORITY
Kate Miller
Executive Director
Attest:

Laura Sanderlin
Board Secretary
Approved as to form and procedure:

Osman Mufti
NVTA General Counsel
' 'P(Q K~te Miller (Feb 26, 202n8:29 PST)
Lawuz,S~
Osman Mufti (Feb 26, 202415:58 PST)
62 Agreement 04-2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 20 of 20

CITY OF AMERICAN CANYON
Jason Holley
City Manager
Attest:

Taresa Geilfuss
City Clerk
Approved as to form and procedure:

William D. Ross
City Attorney
63 AGREEMENT 04 - 2957 Project No. 0419000297 EA 4Q010 04-NAP-29-0.6/2.1 Project Development Agreement 2017-02-17 (Created September 25, 2023) 1 of 4 FUNDING SUMMARY NO. 01 FUNDING TABLE v. 1 PA&ED Source Party Fund Type Totals LOCAL CALTRANS SettlementM 955,000 LOCAL- FEDERAL NVTA RSTP 3,000,000 LOCAL NVTA Local 500,000 Totals 4,455,000 MNon-federal match 64 FUNDING SUMMARY No. 01 AGREEMENT 04 - 2957 Project No. 0419000297 Project Development Agreement 2017-02-17 (Created September 25, 2023) 2 of 4 SPENDING SUMMARY v 2 PA&ED Fund Type CALTRANS NVTA Totals Settlement 0 955,000 955,000 RSTP 0 3,000,000 3,000,000 Local 500,000 0 0 Totals 500,000 3,955,000 4,455,000 65 FUNDING SUMMARY No. 01 AGREEMENT 04 - 2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 3 of 5 Funding

1. If there are insufficient funds available in this AGREEMENT to place the PROJECT right-of-way in a safe and operable condition, the appropriate IMPLEMENTING AGENCY will fund these activities until such time as PARTIES amend this AGREEMENT.

That IMPLEMENTING AGENCY may request reimbursement for these costs during the amendment process.

2. If there are insufficient funds in this AGREEMENT to implement the obligations and responsibilities of this AGREEMENT, including the applicable commitments and conditions included in the PROJECT environmental documentation, permits, agreements, and/or approvals that are in effect at a time that WORK stops, each PARTY accepts responsibility to fund their respective WORK until such time as PARTIES amend this AGREEMENT.

Each PARTY may request reimbursement for these costs during the amendment process.

3. The cost of any engineering support performed by CALTRANS includes all direct and applicable indirect costs. CALTRANS calculates indirect costs based solely on the type of funds used to pay support costs. State and federal funds administered by CALTRANS are subject to the current Program Functional Rate. All other funds are subject to the current Program Functional Rate and the current Administration Rate. The Program Functional Rate and Administration Rate are adjusted periodically.

4. If the WORK is funded with state or federal funds, any PARTY seeking CALTRANS reimbursement of indirect costs must submit an indirect cost rate proposal and central service cost allocation plan (if any) in accordance with Local Assistance Procedures Manual, 2 CFR, Part 200 and Chapter 5. These documents are to be submitted annually to CALTRANS’ Audits and Investigations for review and acceptance prior to CALTRANS’ reimbursement of indirect costs.

5. Travel, per diem, and third-party contract reimbursements for WORK are to be paid from the funds in this AGREEMENT only after the contractor performs the work and incurs said costs.
66 AGREEMENT 04 - 2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 4 of 5 Payments for travel and per diem will not exceed the rates paid rank and file state employees under current California Department of Human Resources (CalHR) rules current at the effective date of this AGREEMENT.

If NVTA invoices for rates in excess of CalHR rates, NVTA will fund the cost difference and reimburse CALTRANS for any overpayment.

6. In accordance with the CALTRANS Federal-Aid Project Funding Guidelines, PARTIES must obtain approval from the Federal Highway Administration prior to any PROJECT funding changes that that will change the federal share of funds.

7. Notwithstanding the terms of this AGREEMENT, PARTIES agree to abide by the funding guidelines for all contributed funds that are programmed and allocated by the CTC.

Invoicing and Payment

8. PARTIES will invoice for funds where the SPENDING SUMMARY shows that one PARTY provides funds for use by another PARTY. PARTIES will pay invoices within forty-five (45) calendar days of receipt of invoice when not paying with Electronic Funds Transfer (EFT). When paying with EFT, NVTA will pay invoices within five (5) calendar days of receipt of invoice.

9. If NVTA has received EFT certification from CALTRANS then NVTA will use the EFT mechanism and follow all EFT procedures to pay all invoices issued from CALTRANS.

10. When a PARTY is reimbursed for actual cost, invoices will be submitted each month for the prior month's expenditures. After all PROJECT COMPONENT WORK is complete, PARTIES will submit a final accounting of all PROJECT COMPONENT costs. Based on the final accounting, PARTIES will invoice or refund as necessary to satisfy the financial commitments of this AGREEMENT.

11. If an executed Program Supplement Agreement (PSA) or STIP Planning, Programming, and Monitoring Program Fund Transfer Agreement (PPM) exists for this PROJECT then NVTA will abide by the billing and payment conditions detailed for the fund types identified in the PSA or PPM.

12. If CALTRANS reimburses NVTA for any costs later determined to be unallowable, NVTA will reimburse those funds.
67 AGREEMENT 04 - 2957
Project No. 0419000297
Project Development Agreement 2017-02-17 (Created September 25, 2023) 5 of 5 Project Approval and Environmental Document (PA&ED)

13. CALTRANS will invoice NVTA for a $45,000 initial deposit after execution of this AGREEMENT and forty-five (45) working days prior to the commencement of PA&ED expenditures. This deposit represents two (2) month’s estimated costs for Local funds.

Thereafter, PARTIES will invoice and reimburse for actual costs incurred and paid. 68 Cooperative Agreement 04-2957 Execution
Process
Final Audit Report
Created:

By:

Status:

Transaction ID:
2024-02-22
Caltrans.Coop Exlla.llion ([email protected]) Signed
CBJCHBCMBMBOfol.tDWbu37ZITll{()o8kVAXlJodvXkzsqH
2024-02-29
"Cooperative Agreement 04-2957 Execution Process" History ~ Document created by Caltrans.Coop Execution ([email protected]) 2024-02-22 - 9:43:21 PM GMT

8.- Document emailed to Eman Hosseini-Bidokhti ([email protected]) for approval 2024-02-22 - 9:45:02 PM GMT
~ Email viewed by Eman Hosseini-Bidokhti ([email protected]) 2024-02-22 - 9:45:53 PM GMT
&o, Document approved by Eman Hosseini-Bidokhti ([email protected]) Approval Date: 2024-02-22-10:47:44 PM GMT- llme Source: server

12.. Document emailed to Jeffrey Kuehnel ([email protected]) for signature 2024-02-22 - 10:47:46 PM GMT
~ Email viewed by Jeffrey Kuehnel ([email protected]) 2024-02-22 - 10:53:40 PM GMT
&o, Document e-signed by Jeffrey Kuehnel ([email protected]) Signature Date: 2024-02-22 - 10:53:48 PM GMT - Time Source: server I?.. Document emailed to Pomalou Some ([email protected]) for approval 2024-02-22 - 10:53:51 PM GMT
~ Email viewed by Pomalou Some ([email protected]) 2024-02-22 - 10:56:23 PM GMT
&o, Document approved by Pomalou Some ([email protected]) .Approval Data: 2024-02-22 - 11 :01 :30 PM GMT - lime Source: serwr ,.
. I Powered by
Adobe
Acrobat Sign 69
g Document emailed to Nadine Karavan {[email protected]) for signature 2024-02-22-11:01:33 PM GMT
0o, Document e--signed by Nadine Karavan ([email protected]) Signature Date: 2024-02-23 - 4:59:42 PM GMT - Time Source: server E! Document emailed to Eman Hosseini-Bidokhti ([email protected]) for approval 2024-02-23 - 4:59:44 PM GMT
~ Email viewed by Eman Hosseini-Bidokhti ([email protected]) 2024-02-23 - 5:49:34 PM GMT
0o, Document approved by Eman Hosseini-Bidokhti ([email protected]) Approval Date: 2024-02-23 - 5:52:29 PM GMT - lime Source: server l2+. Document emailed to Osman Mufti ([email protected]) for signature 2024-02-23 - 5:52:31 PM GMT
~ Email viewed by Osman Mufti ([email protected])
2024·02-23-7:35:13 PM GMT
0o, Document e--signed by Osman Mufti ([email protected]) SignabJra Date: 2024-02-26 - 11 :58:44 PM GMT - lime Source: server

12.. Document emailed to Kate Miller ([email protected]) for signature 2024-02-26-11:58:48 PM GMT
~ Email viewed by Kate Miller {[email protected])
2024-02-27 - 2:28:46 AM GMT
0o, Document e--signed by Kate Miller ([email protected]) SignabJre Date: 2024-02-27 - 2:29:39 Nii GMT - Time Souroe: server f2. Document emailed to Laura Sanderlin ([email protected]) for signature 2024-02-27-2:29:41 AM GMT
~ Email viewed by Laura Sanderlin ([email protected]) 2024-02-27 - 3:41 :34 AM GMT
0o, Document e--signed by Laura Sanderlin ([email protected]) Signature Date: 2024-02-27 - 4:50:00 PM GMT - Time Source: server g Document emailed to William Ross ([email protected]) for signature 2024-02-27 - 4:50:02 PM GMT
~ Email viewed by William Ross ([email protected])
2024-02-27-5:02:13 PM GMT
,.
. I Powered by
Adobe
Acrobat Sign 70
0o, Document e-signed by William Ross ([email protected]) Signature Date: 2024-02-27 - 5:03:42 PM GMT - Time Source: server 1:2. Document emailed to Jason Holley [email protected]) for signature 2024-02-27 • 5:03:44 PM GMT
f:l Email viewed by Jason Holley ([email protected]) 2024-02-27 - 6:11 :39 PM GMT
0o, Document e--signed by Jason Holley ([email protected]) Signature Date: 2024-02-27 - 6:13:02 PM GMT - Time Source: server E! Document emailed to Taresa Geilfuss ([email protected]) for signature 2024-02-27-6:13:04 PM GMT
f:l Email viewed by Taresa Geilfuss ([email protected]) 2024-02-27 - 6:24:48 PM GMT
0o, Document a-signed by Taresa Geilfuss ([email protected]) Signature Data: 2024-02-27 - 6:25:19 PM GMT - Time Source: server g Document emailed to Eman Hosseini-Bidokhti ([email protected]) for approval 2024-02-27 - 6:25:22 PM GMT
f:l Email viewed by Eman Hosseini-Bidokhti ([email protected]) 2024-02-27 - 6:51 :00 PM GMT
0o, Document approved by Eman Hosseini-Bidokhti ([email protected]) Approval Date: 2024-02-27-6:51:10 PM GMT-lime Source: 98fV8r g Document emailed to Amani Meligy ([email protected]) for approval 2024-02-27 - 8:51 :13 PM GMT
f:l Email viewed by Amani Meligy ([email protected]) 2024-02-28 - 5:49:50 /W GMT
0o, Document approved by Amani Meligy ([email protected]) Approval Date: 2024-02-28 - 7:28:34 PM GMT - Tlme Source: IIBMlr

12. Document emailed to Robert Effinger ([email protected]) for signature 2024-02-28 - 7:28:37 PM GMT
f:l Email viewed by Robert Effinger ([email protected]) 2024-02-29 - 3:28:27 /W GMT
0o, Document e-signed by Robert Effinger ([email protected]) Signature Date: 2024-02-29 - 3:55:38 PM GMT - Time Source: server ,.
. I Powered by
Adobe
Acrobat Sign 71
0 Agreement completed.
2024-02-29 - 3:55:38 PM GMT
,.. I Powered by
Adobe
Acrobat Sign 72

CITY COUNCILMEMBER REPORT
Council
Meeting
Date:
02/03/2026 Submitted
by: *
Mayor Pierre Washington
Event
Date:
28/01/2026 Event Type Community Event
Event Title: Ribbon Cutting for Wetlands Edge Park Outdoor Education Project Event Report: On Wednesday, January 28th, the council, City Staff, led by City Manager Jason Holley and Deputy City Manager Allie Ikeda, educators, and community advocates celebrated the ribbon cutting of the Outdoor Education Project, a meaningful investment in environmental stewardship, education and community connection.

Event
Date:
29/01/2026 Event Type Community Event
Event Title: Napa River Ecology Center -Winter Open House Event Report: As American Canyon continues to grow, our responsibility grows with it.  Facilities like this help ensure that progress and sustainability move hand in hand.

This ECO Center is an investment in our kids, our neighborhood, and the legacy we leave behind.

I want to especially thank Janelle Sellick and her incredible team for her leadership, vision and hard work to make this possible, and our community is better because of it.

Event
Date:
30/01/2026 Event Type Committee Report
Event Title: Napa Youth Council
73 Event Report: On Friday, January 30, I met with the Napa Youth Council where they presented an overview of tabaco related data highlighting ongoing concerns regarding youth access to Tabacco and nicotine products, trends showing the impact of Tabacco use on youth health and disparities in Tabacco exposure and marketing that affect young people.  The data reinforced the need for continued prevention efforts and policy level solutions.

Event
Date:
31/12/2025 Event Type Community Event
Event Title: American Canyon Choir Crabfeed
Event Report: Another successful fund-raising event for the American Canyon Choir Crab feed.  Fun, Food and Fellowship. 74 Future Agenda Items
February 4, 2026, OSATS. 6:30 p.m.

Selection of Chair / Vice Chair
American Canyon Bicycle Friendly Designation
Application
Parks and Trail Signage Update
February 5, 2026, Finance Subcom. 1:00 a.m.

Mid-year Budget Review
Fiscal Policy Update Work Program
February 6, 2026, Special City Council 9:00 a.m.

Annual Strategic Plan
February 12, 2026, PCS Comm. 6:30 p.m.

Pickleball Discussion
Inflatable Play Equipment Policy Update
February 17, 2026, City Council 6:30 p.m.

Acknowledging Ramadan
Mid-year Budget Review & Adjustments
Annual Comprehensive Financial Report and
2024-25 Year End Results
February 26, 2026, Planning Comm. 6:30 p.m.

Enclave at Canyon Estates Setback Variance
Housing Element and General Plan Annual
Report
March 3, 2026, City Council 6:30 p.m.

Acknowledging Holi
National Women's History Month
Human Resources Annual Update
Utilities Update
Communications Update
March 4, 2026, OSATS Comm. 6:30 p.m.

Countywide Active Transportation Plan
FY2026/27 CIP Discussion
March 12, 2026, PCS Comm. 6:30 p.m.

FY2026/27 CIP Discussion
Develop Adult Fee Waiver Program
March 17, 2026, City Council. 6:30 p.m.

American Red Cross Month
Sites Project Update
March 26, 2026, Planning Comm. 6:30 p.m.

TBD
April 1, 2026, OSATS Comm. 6:30 p.m.

Parks and Community Services Master Plan
Active Transportation Plan - General Plan
Amendment
April 7, 2026, City Council 6:30 p.m.

Arts Month
Sexual Assault Awareness Month
National Volunteer Week
Annual Police Report
April 9, 2026, PCS Comm. 6:30 p.m.

Meeting Cancelled
Unscheduled Council Directed Items
Item Councilmember Date of Vote Notes
All Electric Reach Code
(Discussion only)
Joseph 11/7/2023 On hold pending RCAAP and Berkeley
litigation.

Food Ware Ordinance Joseph 9/17/2024 On hold, pending RCAAP Purple Heart Designation Washington 10/15/2024 In progress, Council date TBD Clarke Ranch
Improvements
Oro 12/16/2025 In progress, Council date TBD
Review of Inclusionary
Housing Ordinance
Joseph 01/20/2026 In progress, Council date TBD
75