Cities Index.
3. Addendum Revisions Memo dated April 4, 2022

Anaheim City Council
May 17, 2022

Document
3. Addendum Revisions Memo dated April 4, 2022
Meeting
May 17, 2022
Body
Anaheim City Council
Original file
551 KB
Text extracted from the city's file for reading and search. Open the original on local.anaheim.net. That file is the official record.

5 Hutton Centre Drive, Suite 500 | Santa Ana, CA 92707
Office: 949.472.3505 | Fax: 949.472.8373

MEMORANDUM

To: Stephen Cruz, P.E., City of Anaheim

From: Kristen Bogue, Michael Baker International

Date: April 4, 2022

Subject: Orangewood Addendum Revisions Memorandum

The intent of this Memorandum is to clarify slight modifications to the Orangewood Avenue Improvements Addendum No. 9 to EIR No. 339, adopted by the Anaheim City Council on December 7, 2021 ( 2021 Addendum) . As part of the proposed bridge widening, the Basis of Design Report (BOD) has been updated, as design of the proposed bridge continues. The BOD report was appended to the 2021 Addendum. As such, the 2021 Addendum has been updated to reflect the most current version of the BOD Report (revisions dated March 2022).

The revised BOD includes modifications to the proposed method of scour protection. Such methods have been considered as part of the Addendum. These changes do not result in changes to the analysis presented in the Addendum. The revised Addendum includes the updated Appendix D, Basis of Design Report, as well as updates to the text regarding the date of the report (pages 1-10 and 3-57) and the scour depth (page 3-59). In addition, the proposed construction schedule as been updated accordingly (page 2-9).

These clarifications and modifications are not cons idered significant new information under the California Environmental Quality Act (CEQA) and would not result in any new or substantially greater significant impacts as compared to those identified in the adopted 2021 Addendum.

← All documents from this meeting