JEFFERSON STVAN BUREN ST

RICHFIELD RD

MIRALOMA AVE

ORANGETHORPE AVE

LA PALMA AVE

LAKEVIEW AVE

CITY OF ANAHEIM

CITY OF PLACENTIA

VICINITY MAP

PROJECT LOCATION

DEPARTMENT OF PUBLIC WORKS

CITY OF ANAHEIM
C
ITY

OF ANAHE IM CALIFORN
IA
FOUN D E D 1 8 5 7

CITY OF ANAHEIM

DEPARTMENT OF PUBLIC WORKS

VICINITY MAP
JEFFERSON ST., VAN BUREN ST., AND RICHFIELD RD.

REHABILITATION PROJECT WITH PLACENTIA

CITY OF ANAHEIM
Anaheim's Portion of Placentia 21-22 Arterial Rehab
Project ALL AMERICAN

ASPHALT
Jefferson St. (From Miraloma Ave to Orangethorpe), Van Buren St. (From Miramola Ave to Orangethorpe Ave.) , and Richfield Rd. (From La Palma to Miraloma Ave)

ITEM
NO. ITEM DESCRIPTION BID QTY. UNIT

PRICE TOTAL
1 Mobilization 0.055 LS $115,00

0.00 $6,325.00
2 Traffic Control and Public safety 0.055 LS $122,00

0.00 $6,710.00
3 Best management practices 0.055 LS $35,000.
00 $1,925.00
4 Surface preparation and crack seal 0.055 LS $50,000. 00 $2,750.00
5 2" cold mill 102,27
5 SF $0.14 $14,318.50
6 3.25" cold mill 7,753 SF $0.58 $4,496.74
7 AC pavement 58.551
31 TON $96.00 $5,620.93
8 ARHM placement 1,357.0
12 TON $120.00 $162,841.44
9 Saw cut and remove existing (joint to joint) and
reconstruct 4" PCC sidewalk per SPWWC Std.

Plan 113-2
845 SF $13.00 $10,985.00
10 Saw cut and remove existing (joint to joint) and
reconstruct PCC curb and gutter (height to match
existing) per SWPPWC 120-2, Type A, include 1'
wide AC slot trench
100 LF $85.00 $8,500.00
11 Saw cut and remove existing (joint to joint) and
reconstruct 6" pcc curb per SPPWC 120-2, type
A1-6, include 1' wide AC slot patch
31 LF $90.00 $2,790.00
12 Saw cut and remove existing (joint to joint) and
reconstruct PCC curb (height to match existing)
per SPPWC 120-2, TYPE A1, include 1' wide AC
slot patch

28.5 LF $90.00 $2,565.00
13 Remove survey ring and cover. Contractor to
Coordinate with City Surveyor before removal of
existing ring and cover
1 EA $1,000.0
0 $1,000.00
14 Lower, raise and adjust COA sewer manhole to
final grade per COA std plan 205-1 2 EA $1,000.0
0 $2,000.00
15 Remove existing surface and construct a 6"
depth PCC driveway per COA std plan 115-B,
case 2. include 1' AC slot patch.
800 SF $22.00 $17,600.00
16 APU to adjust all electric utility vaults. Please
contact APU Electrical Engineering to plan for
electric utility vault adjustment
3 EA $100.00 $300.00
17 Lower, Raise and adjust water valve box
assembly to final grade per COA std. W-152,
Case 1
21 EA $900.00 $18,900.00
18 Lower, raise and adjust water valve box
assembly to final grade per COA std. W-152,
Case 3. Replace 4ttt box with Bingham & taylor
Mark V 10"
1 EA $900.00 $900.00
19 Adjust existing sewer manholes to grade 1 EA $1,000.0 0 $1,000.00
20 Adjust existing traffic signal pullbox to grade 1 EA $800.00 $800.00 21 Adjust existing monitoring wells to grade 1 EA $900.00 $900.00 22 Remove and clear existing surface tree roots 32 LF $25.00 $800.00 23 Grind existing sidewalk 7 SF $20.00 $140.00
24 Survey Markers and monument preservation and
restoration and construction staking 0.055 LS $48,204. 00 $2,651.22
25 Signing, striping, markings and pavement
legends. 0.060 LS $200,00

0.00 $12,000.00
Subtotal $288,818.83
Construction Contingency (10%) $28,881.88
Construction Management (10%) $28,881.88
Grand Total $346,582.59