Cities Index.
3. Anaheim Public Works Fee Schedule

Anaheim City Council
June 13, 2023

Document
3. Anaheim Public Works Fee Schedule
Meeting
June 13, 2023
Body
Anaheim City Council
Original file
915 KB
Text extracted from the city's file for reading and search. Open the original on local.anaheim.net. That file is the official record.

A. COPIES ( 8.5” X 11”) AND (8.5” X 14”) $0.15/ PAGE
B. PRINTS FROM LASER FICHE ( 8.5” X 11”)
AND (11” X 17”)
$0.75/ PAGE
C. COPIES (11” X 17”) $0.25/ PAGE
D. COPIES (18” X 24”) AND (24” X 36”) $2/ SHEET
E. PRINTS FROM LASER FICHE (18” X 24”)
AND (24” X 36”)
$2.50/ SHEET
F. COMPACT DISCS (W/CASE) $10/ EA
C.Y. CUBIC YARD

EA EACH

GSF GROSS SQUARE FOOT

HR HOUR

LF LINEAR FOOT

MIN MINIMUM

SF SQUARE FOOT
ACRE + LAT ACRE + LATERAL

DU DWELLING UNIT
KEY
A. RIGHT OF WAY CONSTRUCTION

1. PUBLIC AGENCIES/ PUBLIC UTILITIY $101

2. PUBLIC UTILITY ANNUAL BLANKET PERMIT $574

3. SINGLE FAMILY (Residential) $76

4. COMMERCIAL/ INDUSTRIAL/ TRACTS $101
B. GRADING

1. FLATLAND $101

2. HILLSIDE $152
C. TRANSPORTATION

1. ANNUAL PERMIT $93/ EA

2. SINGLE TRIP $17/ EA
D. PERMIT TIME EXTENSION
(Must be obtained prior to permit expiration -
otherwise, full permit fee will apply)
50% OF

ORIGINAL

PERMIT FEE

PERMIT FEES
A. TRAFFIC IMPACT FEES

1. CONDOMINIUM $3,702/ DU

2. APARTMENT $5,015/ DU

3. OFFICE $12/ GSF

4. COMMERCIAL $50/ GSF

5. INDUSTRIAL $3/ GSF
B. STORM DRAIN IMPACT FEES1

1. SINGLE FAMILY $110,868/ NET ACRE

2. MULTIPLE FAMILY $110,868/ NET ACRE

3. MOBILE HOME $110,868/ NET ACRE

4. HOTEL/ MOTEL, COMMERCIAL,

RECREATIONAL, AND INDUSTRIAL
$110,868/ NET ACRE
C. SEWER IMPACT FEES (ALL LAND
USES)
$640/ 1,000 GSF2
D. ARTERIAL HWY BEAUTIFICATION
(ALL LAND USES)
$18,619/ GROSS ACRE

1) Applicable to Platinum Triangle Mixed Use overlay zone

2) Gross floor building area development greater than 0.4 floor area ratio

SUPPLEMENTAL PLATINUM

TRIANGLE FEES

Effective 10/28/2022
in better understanding and utilizing the services of the Ana- heim Department of Public Works, we have outlined a listing of the services we provide and their applicable rates.

Also listed are the appropriate development impact fees related to various infrastructure improvements that would be required as a result of development.

It should be noted that existing fees may be adjusted or new fees added from time to time.

Our department is always happy to meet with individuals to discuss any specific needs and requirements. Please do not hesitate to call us at (714) 765 -5176 for assistance with any questions or concerns you may have.

We look forward to the opportunity of being of service to you! Rudy Emami
Director of Public Works

Department of Public Works
200 S. Anaheim Blvd.

Anaheim, California 92805
(714) 765-5176 Fax: (714) 765-5225
www.anaheim.net

To assist you... COPY FEES

PUBLIC WORKS

PUBLIC WORKS

A. PLAN CHECKING & ENGINEERING $163/ HR
B. CONSTRUCTION INSPECTION
REGULAR $143/ HR
OVERTIME $164/ HR
C. T.V. SEWER INSPECTION (2 HRS. MIN.) $184/ HR
D. SURVEY 2-PERSON CREW $250/HR
E. REAL PROPERTY SERVICES $163/ HR
F. CONSULTANT SERVICES AT CONTRACT RATE G. CLERICAL $74/ HR
H. SIDEWALK WAIVER $302/ EA
I. FINAL MAP DOCUMENTS $35/ SHEET
J. PLANS AND SPECIFICATIONS ACTUAL COST
MAILING FEE $22.99
K. Pavement Cut Fees

SERVICE FEE DEPOSITS
A. TRAFFIC STUDIES

1. LESS THAN 100 PEAK TRIPS $2,175

2. 100 - 250 PEAK TRIPS $4,350

3. OVER 250 PEAK TRIPS $7,250
B. TRAFFIC SIGNAL (Plan check & inspection) $6,000
C. DESIGN STUDIES

1. SEWER / HYDROLOGY $2,300

2. RIGHT-OF-WAY SKETCHES $500

3. SPECIFIC PLAN REVIEWS $1,000

4. MISCELLANEOUS TECHNICAL REVIEWS $2,300

5. SEWER STUDIES/ REVIEWS
MINOR $4,500
MAJOR $8,500
D. PLAN CHECKING& INSPECTION

1. TRACTS (includes Sewer, Street, Grading and
Storm Drain Improvement Plans)

SINGLE FAMILY ($6,000 MINIMUM) $750/ LOT
MULTI– FAMILY ($6,000 MINIMUM) $300/ UNIT

2. TRACT/ PARCEL MAPS (map only) $7,500

3. LOT LINE ADJUSTMENT $3,500

4. IMPROVEMENT PLANS
STREET/ STORM DRAIN $13/ LF
Minimum Deposit $7,000
SEWER $12/ LF
Minimum Deposit $5,000

5. MINOR GRADING (no building pad) $1,400

6. FLATLAND GRADING PLAN $6,000

7. HILLSIDE GRADING PROJECT
LESS THAN 100 C.Y. $4,500
100 - 10,000 C.Y. $6,500
10,001 - 100,000 C.Y. $8,500
100,001 - 1,000,000 C.Y. $12,100
OVER 1,000,000 C.Y. $16,500

8. REVERSION TO ACREAGE $1,400

9. CERTIFICATE OF COMPLIANCE $2,000

10. CERTIFICATE OF CORRECTION $1,000
E. TECHNICAL REAL PROPERTY REVIEW $1,500
F. DEED PREP/ PROCESSING $2,500
G. ABANDONMENT $3,000
H. ENCROACHMENT $2,000
I. NPDES WATER QUALITY MNGMT PLANS $3,000
J. PERMIT INSPECTION DEPOSITS

1. SINGLE FAMILY - Driveway approach/curb drains $163 MIN

2. SINGLE FAMILY- Sidewalk $0

3. COMMERCIAL - Driveway approach $650 MIN

4. COMMERCIAL - Sidewalk $500 MIN

5. INDUSTRIAL - Driveway approach $650 MIN

6. INDUSTRIAL - Sidewalk $500 MIN

7. MISCELLANEOUS COMMERCIAL/ INDUSTRIAL $960 MIN

8. WATER/ ELECTRICAL SERVICE $960 MIN

9. SEWER LATERALS $960 MIN

10. GROUND WATER MONITORING (annual)1 $650 EA

11. GROUND WATER INSTALL/ DESTRUCTION1 $350 EA

12. TELECOMMUNICATION MASTER PLAN $5,000

13. LANE CLOSURE $100/ DAY
1) Fee J10 and J11 - Monitoring requires a 4-hr. min. deposit at regular con- struction inspection rate; installation/destruction requires a 3 -hr. min deposit

IMPACT FEES
A. TRANSPORTATION IMPACT AND

IMPROVEMENT FEES

1. SINGLE FAMILY $2,029/ UNIT

2. MULTI FAMILY $1,297/ UNIT

3. HOTEL/ MOTEL ROOM $1,474/ UNIT

4. OFFICE $3.67/ GSF

5. RETAIL/COMMERCIAL $5.50/ GSF

6. INDUSTRIAL $1.42/ GSF

7. PEAK HOUR TRIP END $1,285/ TRIP
B. SEWER CONNECTION ($250 min) $350/ ACRE
F. SEWER ASSESSMENT AREAS

1. MOHLER DRIVE $1,988/ ACRE+LATERAL

2. MARTELLA LANE $6,913/ ACRE+LATERAL

3. EUCALYPTUS DRIVE (EAST) $21,016/ ACRE+LATERAL

4. EUCALYPTUS DRIVE (WEST) $21,016/ ACRE+LATERAL

5. TIMKEN CANYON $16,715/ ACRE+LATERAL

6. TIMKEN ROAD $7,462/ ACRE+LATERAL

7. PERALTA HILLS DRIVE $1,149/ ACRE+LATERAL

8. COUNTRY HILL ROAD $3,088/ ACRE+LATERAL

9. LINCOLN AVE. - WESTERN ST. $1,911/ LOT

10. CLEMENTINE ST. - ELM ST. $26,105/ ACRE

11. COFFMAN ST. - CYPRESS ST. $12,890/ ACRE
G. STORM DRAIN IMPACT FEES (Anaheim Resort Area & South Central Anaheim; not applicable to Platinum Triangle Mixed Use overlay zone)

1. SINGLE FAMILY $19,080/ NET ACRE

2. MULTIPLE FAMILY $24,296/NET ACRE

3. MOBILE HOME $27,812/ NET ACRE

4. HOTEL/ MOTEL, COMMERCIAL/

RECREATIONAL & INDUSTRIAL
$34,769 NET ACRE
H. STORM DRAIN IMPACT FEES (Drainage District 27; not applicable to Platinum Triangle Mixed Use overlay zone)

1. SINGLE FAMILY $28,599/ NET ACRE

2. MULTIPLE FAMILY $35,161/ NET ACRE

3. MOBILE HOME $41,705/ NET ACRE

4. HOTEL/ MOTEL, COMMERCIAL/

RECREATIONAL & INDUSTRIAL
$52,132/ NET ACRE
I. STORM DRAIN ASSESSMENT AREAS

1. ANAHEIM CANYON INDUSTRIAL $2,000/ ACRE

2. MONTE VISTA $3,552/ ACRE

3. LAKEVIEW AVENUE $2,436/ ACRE

4. CLEMENTINE STREET $1,200/ ACRE

5. SAVANA STREET $3,575/ ACRE

6. HOWELL AVENUE - SUNCLAIR $3,262/ ACRE

7. WEIR CANYON $6,751/ ACRE

8. ORANGEWOOD AVENUE $2,563/ ACRE

9. ORANGEFAIR LANE - COMMER- $9,230/ ACRE

10. RIVERA M.H. PARK/ FUJISHIGE $6,347/ ACRE

11. LEMON $7,150/ ACRE
ZONE
A
ZONE
B
ZONE
C
ZONE
D

1. SINGLE FAMILY (per unit) $1,322 $2,222 $1,600 $356

2. MULTI-FAMILY (per unit) $1,322 $2,222 $1,600 $356

3. CORRIDOR RESIDENTIAL (per
unit)
$1,322 $2,222 $1,600 $356

4. MOBILE HOME (per unit) $1,322 $2,222 $1,600 $356

5. HOTEL/ MOTEL (per room) $444 $747 $537 $119

6. MIXED USE RESIDENTIAL (per
unit)
$1,322 $2,222 $1,600 $356

7. MIXED USE NON-RESIDENTIAL
(per 1,000 sf of gross floor area)
$614 $1,033 $745 $164

8. COMMERCIAL (per 1,000 sf of
gross floor area)
$614 $1,033 $745 $164

9. INDUSTRIAL (per 1,000 sf of
gross floor area)
$430 $724 $521 $116

10. INSTITUTIONAL (per 1,000 sf of
gross floor area)
$369 $620 $446 $101

11. QUASI PUBLIC/ RECREATIONAL
(per 1,000 sf of gross floor area)
$35 $60 $42 $9
D. SEWER IMPACT FEES (East Anaheim)
ZONE
A
ZONE
B
ZONE
C
ZONE
D

1. SINGLE FAMILY (per unit)
ESTATE $787 $1,101 $0 $0

2. MULTI-FAMILY (per unit)
LOW-MEDIUM $0 $1,296 $0 $0

3. MOBILE HOME (per unit) $0 $0 $0 $0

4. HOTEL/ MOTEL (per unit) $0 $0 $0 $0

5. COMMERCIAL (per 1,000 sf) $0 $0 $0 $0

6. INDUSTRIAL (per 1,000 sf) $0 $0 $0 $0

7. INSTITUTIONAL (per 1,000 sf) $0 $0 $0 $0

SERVICE FEES
C. SEWER IMPACT FEES (West Anaheim)
E. SEWER IMPACT FEES (Central Anaheim)
ZONE
A
ZONE
B
ZONE
C
ZONE
D

1. SINGLE FAMILY (per unit) $2,235 $1,864 $2,130 $2,218

2. MULTI-FAMILY (per unit) $2,235 $1,864 $2,130 $2,218

3. CORRIDOR RESIDENTIAL (per
unit)
$2,235 $1,864 $2,130 $2,218

4. MOBILE HOME (per unit) $844 $702 $805 $838

5. HOTEL/ MOTEL (per room) $631 $527 $602 $628

6. MIXED USE RESIDENTIAL (per
unit)
$1,287 $1,073 $1,226 $1,278

7. MIXED USE NON-RESIDENTIAL
(per 1,000 sf of gross floor area)
$876 $730 $835 $870

8. COMMERCIAL (per 1,000 sf of
gross floor area)
$876 $730 $835 $870

9. INDUSTRIAL (per 1,000 sf of
gross floor area)
$613 $511 $584 $613

10. INSTITUTIONAL (per 1,000 sf of
gross floor area)
$525 $439 $501 $509

11. QUASI PUBLIC/ RECREATIONAL
(per 1,000 sf of gross floor area)
$50 $41 $47 $50

Unit Cost
PCI Range: ≥ 65 65 to 55 ≤ 55
Trench & Borepit Fee ($/Sf.): $8.40 $11.60 3.60
Pothole Fee: ($/Ea.): $69.30 $95.70 30.29

← All documents from this meeting