Cities Index.
1. Resolution with Exhibit A

Anaheim City Council
June 27, 2023

Document
1. Resolution with Exhibit A
Meeting
June 27, 2023
Body
Anaheim City Council
Original file
289 KB
Text extracted from the city's file for reading and search. Open the original on local.anaheim.net. That file is the official record.

RESOLUTION NO. 2023-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

ANAHEIM ADOPTING NEW FEE SCHEDULES FOR THE

PUBLIC WORKS DEPARTMENT OF THE CITY OF

ANAHEIM

WHEREAS, the Anaheim Municipal Code and the prov isions of state law authorize the City Council of the City of Anaheim (“City Council”) to establish fees and rates of charges for the purpose of defraying the costs and expenses to the City of Anaheim (the “City”) of permits, map filing, map checking, insp ection and other services and activities relating to the Anaheim Public Works Department (the “Department”); and

WHEREAS, said costs and expenses include labor costs incurred by City staff and its consultants in reviewing, analyzing and processing of pe rmit applications and providing services and other direct and indirect costs incurred by the City relating thereto (the “Public Works Fees”); and

WHEREAS, the City Council has heretofore established fees and rates of charges for such purposes pursuant t o authorization of the Anaheim Municipal Code and in accordance with the requirements of state law; and

WHEREAS, due to increases in labor and materials costs, and the desire to impose fees and rates which more fully recover the actual costs incurred by the City in processing said applications and providing said services, as calculated and provided in cost of service studies (the “Cost Studies”), it is in the public interest and general welfare to amend said Public Works Fees in the manner hereinafter set forth; and

WHEREAS, the Public Works Fees are hereinafter referred to as the “Fees”; and

WHEREAS, said Fees as hereinafter set forth have been considered at a duly noticed public meeting or hearing as required by law; and

WHEREAS, the City Co uncil finds that said Fees, in the amount hereinafter set forth in this resolution, are less than or equal to, but in any event do not exceed, the actual direct and indirect costs and expenses incurred by the City of Anaheim in providing said services.

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANAHEIM AS FOLLOWS:

Section 1. SERVICE FEES, PERMIT FEES

A. Adoption of Schedule s. The Fees to be charged and collected by the Public Works Department of the City of Anaheim shall be as set forth in Exhibit “A”, which is attached hereto and incorporated herein by reference.

2 B. Incorporation of Exhibit. Exhibit “A”, inclusive, referred to and adopted pursuant to paragraph A of this Section 1 is hereby incorporated herein by this refer ence as if set forth in full. The fees and rates set forth in the Exhibit are based on full processing costs, which are defined as the direct cost required to receive, review, check, analyze, and take action upon applications, and provide inspection, re -inspection and other services, plus applicable overhead costs as determined pursuant to the Cost Studies, which are on file in the Department of Public Works, adjusted by no more than 3%, which is not in excess of the 12 -month percent change (December 2022) in the Los Angeles – Long Beach – Anaheim, CA Consumer Price Index (Urban Consumers) (CPI -U). All costs for consultant services, inclusive of any applicable in - house administrative costs, for services which cannot be completely processed in -house shall be borne by the applicant. Any fees and charges incurred pursuant to this resolution shall be deemed a debt due and owing to the City of Anaheim by the applicant until paid in full.

C. Flat Fees. Where applicable, flat fees have been established for cert ain services where the average cost is subject to minimum fluctuation. These flat fees are as set forth in the respective Exhibits incorporated into this resolution.

D. Fees Based on Hourly Charges. Where applicable, hourly charges shall be accumulated for processing of the regulated activities, and the applicant shall pay all such accumulated charges (less any deposits made pursuant to Section 2 below) prior to final action on the permit or project , or as soon thereafter as such costs may be finally de termined. The payment of such costs may be made a condition of approval for any such permit or final project approval. If payment is not received within fifteen (15) working days after the invoice due date, all processing activities related to the regula ted activities will be terminated until payment is received.

Section 2. SERVICE FEE DEPOSITS

A. Required Deposits. In cases where an hourly rate is being charged, as opposed to a flat fee, each applicant shall place on deposit with the City the sum sp ecified in Exhibit “A” under the heading “Service Fee Deposits” for the applicable project. Deposits have been estimated to represent the minimum amount required to process each project. The costs of an individual project may be significantly more than the Minimum Initial Deposit amount.

B. Credits Against Deposit. Hourly charges incurred in the processing of the development project will be credited against the Minimum Initial Deposit amount on hand until all processing of the development project by th e City has been completed and all costs incurred have been paid.

C. Additional Deposit(s) Required. If at any time, or from time to time, the accumulated charged credited against the Minimum Initial Deposit (or any prior Additional Deposit) result in the remaining deposit amount being reduced below twenty -five percent (25%) of the Minimum Initial Deposit, and in the opinion of the Project Manager, the remaining deposit amount will be insufficient to cover the cost of the remaining charges likely to be inc urred by the City in processing such development project petition or application, the Department of Public

3 Works shall immediately notify the applicant of the additional amount required to be deposited by the applicant to continue the processing of such pr oject (the “Additional Deposit”). The amount of any such Additional Deposit shall be sufficient to increase the balance to fifty percent (50%) of the Minimum Initial Deposit. During the processing of any project, more than on e Additional Deposit may be re quired. If the amount of any such Additional Deposit is not received by the City within fifteen (15) working days after the due date set forth in the replenishment request, all then -current development project processing activities will be terminated until payment is received. In the event of such cessation of activity, all time limits provided for under state statutes for completion of development projects will be suspended for the duration thereof to the extent permitted by law.

Section 3. REFUNDS

If the amount on the deposit exceeds all accumulated costs at the time of the final action on the subject application and/or project services, the excess deposit amount shall be refunded to designated billing party as listed on the DTF/Trust account setup form.

BE IT FURTHER RESOLVED as follows:

1. That City Council Resolution No. 2019 -073, establishing certain fees and charges, be, and the same is hereby, rescinded in its entirety.

2. The Fees set forth in Exhibit A, attached hereto and incorporated by this reference herein, shall be, and are hereby, adopted.

3. The Fees established herein shall become effective sixty (6 0) days following the date of adoption of this Resolution.

4. The Fees established herein shall, upon becoming effective, supersede any fees previously adopted for the same purposes.

5. The City Council hereby declares that should any one or more of the fees established by this Resolution or any portion of this Resolution be declared for any reason to be invalid, it is in the intent of the City Council that it would have adopted all other fees and portion of this Resolution independent of the elimination therefrom of any such fee or such portion as may be declared invalid.

4 THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this ______day of_______________, 2023 , by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

CITY OF ANAHEIM

MAYOR OF THE CITY OF ANAHEIM

ATTEST:

______________________________________

CITY CLERK OF THE CITY OF ANAHEIM
148872

Department of Public Works
Proposed Fee Schedule - FY 2023/24

EXHIBIT A
1 SERVICE FEES
A. PLAN CHECKING & ENGINEERING 168$ /HR.

B. CONSTRUCTION INSPECTION
REGULAR 147$ /HR.

OVERTIME 169$ /HR.

C. T.V. SEWER INSPECTION (2HRS. MIN.) 190$ /HR.

D. SURVEY 2-PERSON CREW 258$ /HR.

E. REAL PROPERTY SERVICES 168$ /HR.

F. CONSULTANT SERVICES
G. CLERICAL 76$ /HR.

H. SIDEWALK WAIVER 311$ /EA.

I. FINAL MAP DOCUMENTS 36$ /SHEET
J. PLANS AND SPECIFICATIONS
MAILING FEE 24$
2 SERVICE FEE DEPOSITS
A. TRAFFIC STUDIES
1 LESS THAN 100 PEAK TRIPS 2,500$
2 100-250 PEAK TRIPS 4,500$
3 OVER 250 PEAK TRIPS 7,500$
B. TRAFFIC SIGNAL (PLAN CHECK & INSPECTION) 6,500$
C. DESIGN STUDIES
1 SEWER / HYDROLOGY 2,300$
2 RIGHT-OF-WAY SKETCHES 500$
3 SPECIAL PLAN REVIEWS 1,000$
4 MISCELLANEOUS TECHNICAL REVIEWS 2,300$
5 SEWER STUDIES/REVIEWS
MINOR 4,500$
MAJOR 8,500$
D. PLAN CHECKING & INSPECTION
1 TRACTS (INCLUDES SEWER, STREET, GRADING AND

STORM DRAIN IMPROVEMENT PLANS)
SINGLE FAILY ($7,000 MINIMUM) 1,000$ /LOT
MULTI-FAMILY ($7,000 MINIMUM) 500$ /UNIT
2 TRACT/PARCEL MAPS (MAP ONLY) 8,000$
3 LOT LINE ADJUSTMENT 4,000$
4 IMPROVEMENT PLANS
STREET/STORM DRAIN 14$ /L.F.

MINIMUM DEPOSIT 7,500$
SEWER 13$ /L.F.

MINIMUM DEPOSIT 5,500$
5 MINOR GRADING (NO BUILDING PAD) 1,500$
6 FLATLAND GRADING PLAN 6,500$
At Contract Rate
Actual Cost
Proposed
Rate FY 2023/24
Rate
Rate
Key: EA. = Each L.F. = Linear Foot
HR. = Hour MIN. = Minimum Page 1 of 2
Department of Public Works
Proposed Fee Schedule - FY 2023/24

EXHIBIT A
7 HILLSIDE GRADING PROJECT
LESS THAN 100 C.Y. 5,000$
100 - 10,000 C.Y. 7,000$
10,001 - 100,000 C.Y. 9,000$
100,001 - 1,000,000 C.Y. 12,500$
OVER 1,000,000 C.Y. 17,000$
8 REVERSION TO ACREAGE 1,500$
9 CERTIFICATE OF COMPLIANCE 2,000$
10 CERTIFICATE OF CORRECTION 1,000$
E. TECHNICAL REAL PROPERTY REVIEW 1,500$
F. DEED PREP/PROCESSING 2,500$
G. ABANDONMENT 3,090$
H. ENCROACHMENT 2,060$
I. NPDES WATER QUALITY MNGMT PLANS 3,090$
J. PERMIT INSPECTION DEPOSITS
1 SINGLE FAMILY - DRIVEWAY APPROACH/CURB DRAINS 168$ MIN. 2 SINGLE FAMILY - SIDEWALK
3 COMMERCIAL- DRIVEWAY APPROACH 700$ MIN.
4 COMMERCIAL - SIDEWALK 600$ MIN.
5 INDUSTRIAL - DRIVEWAY APPROACH 700$ MIN.
6 INDUSTRIAL - SIDEWALK 600$ MIN.
7 MISCELLANEOUS COMMERCIAL/INDUSTRIAL 1,000$ MIN. 8 WATER/ELECTRICAL SERVICE 1,000$ MIN.
9 SEWER LATERALS 1,000$ MIN.
10 GROUND WATER MONITORING (ANNUAL) 1 700$ /EA. 11 GROUND WATER INSTALL/DESTRUCTION 1 400$ /EA. 12 TELECOMMUNICATION MASTER PLAN 5,500$
13 LANE CLOSURE 103$ /DAY
1) FEE H10 AND J11 - MONITORING REQUIRES A 4-HR. MIN. DEPOSIT AT

REGULAR CONSTRUCTION INSPECTION RATE, INSTALLATION /
DESTRUCTION REQUIRES A 3-HR. MIN. DEPOSIT
3 PERMIT FEES
A. RIGHT OF WAY CONSTRUCTION
1 PUBLIC AGENCIES / PUBLIC UTILITY 104$
2 PUBLIC UTILITY ANNUAL BLANKET PERMIT 591$
3 SINGLE FAMILY (RESIDENTIAL) 78$
4 COMMERCIAL/INDUSTRIAL/TRACTS 104$

B GRADING
1 FLATLAND 104$
2 HILLSIDE 157$

C TRANSPORTATION
1 ANNUAL PERMIT *As authorized by Caltrans and the CA Vehicle Code. 90$ /EA. 2 SINGLE TRIP *As authorized by Caltrans and the CA Vehicle Code. 16$ /EA.

D PERMIT TIME EXTENSION
(Must be obtained prior to permit expiration-
otherwise, full permit fee will apply)
50% OF ORIGINAL

PERMIT FEE
Rate
Key: EA. = Each L.F. = Linear Foot
HR. = Hour MIN. = Minimum Page 2 of 2

← All documents from this meeting