EXHIBIT A

Project: Oak Canyon Nature Center Renovations

The work consists of asphalt concrete pavement resurfacing within the existing parking lot, construction of speed hump and ADA access ramps, concrete sidewalks, adjustment of utility structures, striping of crosswalks, lighting removal and replacement, removal and replacement of post & rail fence, remove and replacement of an existing wood fence, construction of wood deck and steps, cable railing, helical piles and connections, handrails, concrete paving with embossment, regrading and installation of decomposed granite pathway, construction of stage improvements, amphitheater benches, and interpretive exhibits and shelving, installation of ADA directional signage, construction of wood bollards, and landscape tie edging, demolition and installation of electrical lighting.

Account No. 216-213-4710-9601
GRA2022-03845, BLD2023-06039

LOWEST AND BEST RESPONSIBLE BIDDER: Armstrong Cal Builders, Inc. 3130 E. Willow St.

Signal Hill, CA, CA 90755
Shawn Salah
(562) 837-8130

PUBLICATION DATES: 8/10/2023, 8/17/2023, 8/24/2023

BID OPENING DATE: 9/7/2023

PREVAILING WAGE RATE RESOLUTION NO: Per Current D.I.R. Publication

AWARD DATE: 9/26/2023

CONTRACT PRICE: $1,118,000
One Million, One Hundred Eighteen
Thousand Dollars and Zero Cents

CONTRACT COMPLETION DAYS: Sixty-Five (65) Working Days

LIQUIDATED DAMAGES: One Thousand Five Hundred Dollars ($1,500) Per Day