Cities Index.
8. Proposal - Towill, Inc.

Anaheim City Council
October 17, 2023

Document
8. Proposal - Towill, Inc.
Meeting
October 17, 2023
Body
Anaheim City Council
Pages
2
Original file
7.6 MB
Text extracted from the city's file for reading and search. Open the original on local.anaheim.net. That file is the official record.

On-CallSurvey6XSSRUW Services
SUBMITTED ON $8*867 
35(PARED BY TOWILL, INC.
352326$/ TO PROVIDE

Towill, Inc. ● 500 S. Main Street ● Suite 540 ● Orange ● California ● 92868 ● 949.261.1900 www.towill.com
August 24, 2023

City of Anaheim
Public Works Department
2nd Floor Engineering Counter
200 South Anaheim Boulevard, Suite 217
Anaheim, CA 92805
Attention: Raul Garcia, PE, PLS, City Surveyor

Re: Request for Proposals to Provide On-Call Survey Support Service for All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services

Dear Mr. Garcia:

Thank you for the opportunity to present our proposal to the City of Anaheim Public Works Department Construction Services Division (City) for all sub-disciplines for Professional Land Surveying and Aerial Mapping Services. Towill is a surveying and mapping firm; this is our sole focus and has been for over 68 years. Land surveying and aerial mapping is what we do, all we do, and we do it in-house. Much of the work we provide is to municipalities and public agencies in support of their Capital Improvement Program (CIP), rehabilitation, and developer projects. We have performed many of the services within the RFP for the City on Gene Autry Way Improvements Project as a subconsultant for an engineering firm, provided monument preservation services for 96 street monuments as a subconsultant for a construction management firm, and have conducted multiple aerial imagery/LiDAR acquisition missions over the City limits as part of our on-call contract with Caltrans.

As a company solely focused on geomatics services, we attract and retain a core group of passionate survey staff and focus our investments on new survey equipment and the latest software. Towill’s key personnel who will be assigned to this contract have an average of over 25 years of professional experience in field surveying, photogrammetric mapping, remote sensing, and GIS. We take pride in designing cost-efficient technical approaches that continually meet or exceed our clients’ requirements for every project assignment.

Our goal is never to just complete a survey/mapping design task but to provide valuable geospatial information that will be used by engineers and others to improve the places where we work and live.

Towill believes that our Core Values result in repeat clients. One of Towill’s core values is the focus that is placed on providing our clients with superior services. The evidence that this core value works is shown by our high rate of repeat clients and referrals. Over 90% of Towill’s annual revenue is from repeat clients. This is a testament to our client focus, culture of client service, and overall ability to deliver on-time, first-time- right services. The City will reap the benefits of a stable, client-focused team that will work on this contract for every assigned task. So, why are we interested in this opportunity to work with the City of Anaheim? Because you provide us with the opportunity to continue to do our best work! If you have any questions, please do not hesitate to contact me at 949.261.1900 ext. 1504 (office), 612.581.8771 (mobile), or [email protected]. As Project Principal and as a member of Towill’s Executive Leadership Team, you know that we bring a strong firm commitment. Thank you for taking the time to read this proposal and the consideration of Towill, Inc.

Sincerely,
TOWILL, INC.

Marvin Miller, MBA, CP, PPS, RPP
Project Principal
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

i

Table of Contents
Scope of Services Offered ................................................................................................................................. 1 Project Related Experiences, References, and Personnel ........................................................................... 10 Organization Chart .......................................................................................................................................... 18 Overview of Management and Supervision of Project Team ........................................................................ 19 Compliance with Federal, State, and Local Funding Requirements ............................................................ 19 Additional Information and Description of Resources .................................................................................. 20 Fee Schedule ................................................................................................................................................... 22 Quality Control/Quality Assurance Program ................................................................................................. 23

What do our clients say about working with Towill?
“Towill has provided exceptional surveying services for a number of City projects large and small. Completed projects occurred within the agreed-upon budget, schedule, and resulted in well-constructed infrastructure throughout the City. Towill staff are friendly and professional, easy to work with and very responsive to our needs.”
- Joe Bride, Public Works Director, City of Del Mar

“Towill, Inc. successfully completed the scope of work required for the project on time and within budget. The project required knowledge of Caltrans improvements and their surveying standards, in which Towill was very competent. Additionally, Towill was very accommodating when requested to provide additional design survey to assist the Resident Engineer with design changes for drainage and ADA improvements without delay. Towill is recommended for future work at the City of Vista.”
- Matt Atteberry, Senior Engineer, City of Vista

“The DWR Geodetic Branch has had a contract with them for surveying services for the last 5 years and just contracted them for another 5 years. They provide exceptional client service and attention to quality. They work closely with us to tailor projects to our exact needs. They are consistently on schedule and budget. I have not seen a more dedicated, efficient, responsive, client service-oriented consultant.” - Daniel K. Mardock, PLS, Chief of the Geodetic Branch (Retired), State of California, Department of Water Resources

“I sincerely thank you and the members of your staff for your assistance on our aerial mapping contracts. The professionalism and expertise you and your staff demonstrated on a continuing basis enabled us to provide survey control and topography to our internal customers in a timely manner.” - Steven G. Steinhoff, Assistant Deputy Director, County of Los Angeles, Dept. of Public Work Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

1 Scope of Services Offered
Since our establishment in 1955, the field of surveying and mapping has been Towill’s sole focus. We have become one of the most accomplished providers of geospatial solutions in the western United States. Towill has invested over $6 million in modern hardware and software so that we can provide our clients with the most accurate, cost-efficient, and timely services available.

Employing approximately 100 dedicated professional team members, Towill offers our clients several convenient California office locations:

Orange, Rancho Cucamonga, San Diego, Fresno, Concord
(headquarters), Oakland, and San Jose, with an additional office in Colorado Springs, Colorado. The map to the right depicts the location of Towill’s California offices.

On-call service contracts continue to be one of Towill’s specialties. Over the past five years, we have successfully held on-call contracts with local agencies throughout Southern California, including Cities of Irvine, Huntington Beach, Chino, Rancho Cucamonga, and Moreno Valley; Orange County Public Works; and the Port of Long Beach. Towill has also been awarded as-needed surveying and mapping contracts from state and federal agencies such as the California Department of Water Resources, Caltrans, Southern California Edison, and the U.S. Army Corps of Engineers. We’ve also worked for the City of Anaheim as a subconsultant for both design and construction management firms performing the majority of the services from the expected scope of work on this contract. Our team is ready and available to begin work, and our dedication to meeting our clients’ needs is what has made Towill successful for over six decades.

A key to Towill’s success over the years has been our commitment to effectively using new technologies to the advantage of our clients. We have invested in the most modern hardware and software and have the necessary knowledge and experience to select the tools that provide our clients with the most budget-friendly and time-efficient approaches to collecting the data they need.

Quality people are our greatest asset, and we encourage innovative, progressive thinking as a path to better solutions. Towill’s competitive edge is our 68 years of experience successfully providing a broad range of geodetic and geospatial services on our clients’ projects. We have the philosophy that it is our role to understand the specific and unique requirements of each of our clients which enables us to design practical, cost-efficient solutions to meet every situation.

Commitment and Strength
Towill’s reputation as a leader in providing geomatics services comes from our continued commitment to our clients. We continually strive to serve as a valued and trusted partner, providing excellent customer and technical service.

We are fully capable of managing the workload that we expect the City will have under this contract. Our firm is built for this type of contract: we are completely flexible with meeting your schedules and budget constraints and have repeatedly shown that we will strive to meet all of your goals on each project.

We have the expertise, institutional knowledge, and the latest technology, and are fortunate to be located within a short commute to the heart of the City, enabling Towill to provide prompt, experienced, and reliable results for all of your survey requests. We’re proud that the scope on the following pages fully covers all aspects of the sub-disciplines within this RFP – Land and Aerial Surveying and Mapping is what we do!

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

2 Professional Land Surveying Services
Construction Staking/Layout
Construction staking assignments begin with our checking and verifying project horizontal and vertical control before the commencement of construction layout work. Our crews will independently survey this control, and we will provide a project control report for use by the construction staking surveyor. A review of the construction plans is completed to determine if sufficient information exists for us to provide construction staking from the plans; we also vigilantly check for errors or omissions. Our experience working from engineering plans has afforded us the insight to know when things do not appear to be in order and may need a second look.

Construction line and grade layout, whether it is for roads, sewer, water, storm drain, or grading, typically requires a swift response to avoid costly construction delays. Field crews are equipped with pre-calculated horizontal and vertical alignments so that offsets can be determined at the time of staking and so that cuts and fills can be compared to design data at the point of collection. All verification data is transferred to Towill’s database for secondary accuracy checks by office personnel.

Towill takes a proactive approach to any construction
project. The first step after receiving the construction plans is to review them and understand what needs to be built and the level of information provided in the plans.

Reviewing the horizontal and vertical controls, construction alignments, profile grades, and joins are just a few of the items that will be reviewed before putting stakes in the ground. If discrepancies are found or clarifications with the plan set are required, a Request for Information (RFI) will be prepared and submitted to the City’s representative
and/or the engineering design representative. Field checks are made to verify joins or other critical elements shown in the design plan set. Once the plans have been reviewed
and all required information is received, the area can be staked for construction.

Monument Preservation
In keeping with Section 8771 of the California Business and Professions Code, Towill recognizes how critically important accurate and enduring survey monumentation and control is to the survey operations of both the City and the surveying community. Without the perpetuation of controlling monuments, countless additional hours of field and office work can occur for both public- and private-sector projects.

Every project we undertake begins with a thorough review of not only record information but also of the proposed construction in the area. Our Project Manager organizes the investigation into existing recorded documentation with the City of Anaheim, the County of Orange, and other agencies. Records research is typically performed by the Project Manager or under his direction. From this research, a plan of action is developed for the preservation of existing monumentation and the setting of new points.

Our first step in preserving the monumentation is to determine by field verification what monuments are still in place, which have been buried, and which have been destroyed. We then advise the City of our findings and plan an operation of setting tie points, which, based on our review of the construction documents, will be established outside of proposed construction activities.

Sample construction staking exhibit

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

3 Monumentation will be marked with either furnished (or as otherwise specified) disks, plugs, or tags, which shall be stamped with the project manager’s California Professional Land Surveyor registration number, or as directed in each task. Monumentation shall be established or preserved for the project or project areas and shall include considerations for utility locations, proper spacing, and durability. All monuments will be field referenced with a minimum of four (4) intersecting reference points, such as cut crosses on curbs, rebars outside the work area, or other approved reference points.

A pre-construction Corner Record will then be prepared and recorded with the County Recorder’s Office for each monument. Corner Records shall include the character of the monument, its record reference, reference ties, and other pertinent data. All such field monumentation work will conform to Section 8771 of the California Business and Professions Code, which addresses the preservation of existing survey monuments.

According to the California Professional Land Surveyors’ Act, a Corner Record may be used to perpetuate, rehabilitate, or reestablish monumentation that has existed in the past in other circumstances; and, when more extensive work is required, or several monuments in the same area are in question, it may be necessary to file a Record of Survey map. Records of Survey will clearly identify project horizontal control, record map information, additional data, and lines and calls prepared in the initial boundary surveys phase.

Once a map is ready, our project manager will submit the document to the City for review and to Orange County for map checking. Any comments will be addressed, and the document will then be filed at the County Recorder’s Office for recordation.

When construction has been completed, we return to the area and determine which monuments and/or tie points will need replacement. In many instances, damage to the existing monuments is limited. In cases where monuments are to be replaced, a durable monument, as described above, or standard well monument, if required by the City, is established and post-construction Corner Records are filed. All documentation and Corner Records will be prepared to meet the requirements of both the City and the County.

Limits of removal are staked based on approved plans and/or visual inspection in the field. Our crews have enough experience with this exercise to realize when things appear to be either insufficient or excessive. If it is believed that the removal limits either exceed or are inadequate for construction, we will advise City staff.

The limits can be staked either at the actual location, such as paint on the curb, or on an offset that can be used later for construction, thereby saving time and money.

Vertical and Horizontal Control
Towill is experienced in conducting conventional surveys, monitoring surveys, precise digital geodetic leveling, and GPS static surveys, as well as establishing local project control. We have set up thousands of control networks and are well-versed in tying into and/or expanding existing control networks. Our staff has decades of experience with a wide variety of coordinate systems and the expertise to know which applies to each project.

Towill is very experienced in the performance of geodetic surveys and is familiar with working in the most current national datums; e.g., the North American Datum of 1983 (NAD83), 2011 (2010), and the North American Vertical Datum of 1988 (NAVD88). We also have a world-renowned geodetic expert on staff to lead any specialty or high-accuracy survey efforts, if needed. Towill keeps up to date with technical issues relating to the evolution of geodetic datums, geodetic surveying technologies, and associated standards and procedures.

For example, Towill is aware that the U.S. is planning to replace NAD83 and NAVD88 with a global datum such as an International Terrestrial Reference Frame (ITRF) realization. Towill can aid the City in assessing the impact of these developments and in devising strategies to deal with these events as they unfold.

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

4 Horizontal and vertical control is the backbone of any successful survey project. The placement of control-point locations is carefully evaluated to determine the most efficient method of performing the project tasks. Existing maps and photography, city and county maps, and available historic maps are studied to determine how to refine control-point locations to better serve each project and make the working conditions safe for the field staff. Whenever possible, the control points are located on or near roads, trails, levees, or other common routes of transportation. Special efforts are made to obtain appropriate permission to access private and/or government properties.

We regularly perform static, rapid-static, kinematic and real-time kinematic (RTK), and real-time network (RTN) GPS surveys to establish ground control, depending on the requirements for the project. We own and use Trimble dual-frequency GPS receivers. Static and fast static sessions are used to establish primary control stations; fast-static and kinematic sessions are used for secondary control. Towill is well-versed in utilizing GPS methods for establishing vertical control and deformation monitoring to various standards, including the National Geodetic Surveys.

GPS observations are downloaded and backed up daily as a precaution against inadvertent loss of data.

Baseline vectors are reduced daily in the field to check for lines that fall outside of normal parameters.

Least-squares adjustments are performed on the data, constraining the newly established control stations to existing horizontal and vertical control.

When enough baselines have been observed to form loops, a loop closure is performed to further confirm the accuracy of the baseline. Unconstrained adjustments are run to test the strength and accuracy of the entire net continuously throughout the duration of the GPS survey. After completing all scheduled GPS observations, we perform a final unconstrained adjustment and compile a report.

Upon completion of the unconstrained adjustment, high-precision network stations are held fixed together with vertical constraining stations, and a constrained horizontal and vertical adjustment is completed using TRIMNET, STARNET, or Geolab software. A geoid model such as Geoid12b is used as the underlying geoid height model to calculate accurate elevations for all points. However, we often refine these data to create a local geoid model using data gathered via differential leveling.

Preparation of Maps, Record of Survey, Corner Records, and Other Official Records Towill’s licensed surveyors are experienced at completing Records of Survey and Corner Records. They have a thorough understanding of when each document is required. A Corner Record should be used to perpetuate, establish, reestablish, and restore monumentation that previously existed in the same location. When more extensive work is required, a material discrepancy is identified, unsurveyed record division lines are to be surveyed, or numerous monuments need to be documented in a geographical area that may be disturbed, it may be more beneficial to the City to file a Record of Survey. Records of Survey will identify project horizontal control, record map information and additional data, and lines and calls prepared in the initial boundary surveys phase. Closures will be performed on all mathematical components. Once a recorded document is ready, Towill’s Project Manager will submit the document to the City for review and to the Orange County Surveyor’s Office for map checking and subsequent filing. Any comments will be quickly answered and incorporated in a revision, if necessary, and returned to the County.

Corner Record example

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

5 Legal Descriptions
Towill has extensive experience and expertise in boundary and property surveys for land and parcel determination, performing tens of thousands of surveys over our 68-year history. The initial step to any successful boundary survey is performing the proper research of land records. Public records research is required to identify primary control, right of way information, and boundary lines, or lines of occupation, before performing the work. Research may be performed at city or county offices, utility agencies, title companies, or other appropriate sources. Necessary records are identified, organized, and analyzed for the field and office tasks.

Once the research is complete and all documentation associated with a boundary has been analyzed, we can prepare highly accurate calculations of where we can expect to locate monumentation associated with the boundary determination. Throughout the course of the field survey (which may utilize both GPS and conventional survey techniques), adjustments can be made to further enhance the accuracy of the search locations and minimize the amount of field time required to complete the survey. When survey results are returned from the field, they are compared to record deeds and maps, and boundary analysis is performed.

With years of experience, we can efficiently and accurately complete the boundary process, compiling an accurate and defendable survey.

Towill’s team of surveyors has the experience and knowledge to tackle all boundary surveys, from public land surveys to subdivision retracements and the establishment of centerlines. Towill consistently remains informed of changes in local, state, and federal laws on surveying and is very active in continuing education to ensure we remain current.

Boundary Control Surveys and Analysis
Towill has extensive expertise in boundary determinations, performing thousands of surveys over our 68-year history. The initial step to any successful boundary survey is proper land records research. Public records research is performed to identify primary control, right of way information, and boundary lines, or lines of occupation before performing the work. Research may be performed at the city offices, county offices, utility agencies, or other appropriate sources. This includes not only the acquisition of the public record documents and the recorded maps, but also any non-record maps and surveys that can be uncovered. Necessary records are identified, organized, and analyzed for the field and office tasks. We visit various agencies to obtain the records and use available documents to guide our field surveying and office mapmaking activities.

Once the research is complete and all of the documentation associated with a boundary has been analyzed, we can perform highly accurate calculations of where we can expect to locate monumentation associated with the boundary determination. Throughout the course of the survey, adjustments can be made to further enhance the accuracy of the search locations and minimize the amount of field time required to complete the survey.

Towill surveyors utilize a combination of GPS and conventional survey methods to obtain locations accurately and with a high degree of efficiency. Our staff has the experience of knowing exactly what procedures are right for any given situation encountered during the course of a survey. Towill’s team of surveyors have the experience and knowledge to tackle all boundary surveys, from public land surveys to subdivision retracements and the establishment of centerlines. Towill consistently remains informed of changes in local, state, and federal laws pertaining to surveying and is very active in continuing education so that we remain current. With years of experience, we can efficiently and accurately complete the boundary process, compiling an accurate and defendable survey.

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

6 Topographic Mapping
Towill regularly performs field topographic surveys
using both GPS and conventional surveying equipment
and techniques. Towill also utilizes various CAD
platforms, including AutoCAD Civil3D, and will deliver
mapping products in formats requested by the City to
your standards. Topographic surveys are typically
performed to produce a detailed map for engineering
design or as supplemental data collection to enhance
and complete photogrammetric mapping. However, we
have experience performing virtually every type of field topographic surveying task. We will make it a priority to meet with City staff before commencing any design
surveys, to ensure that the correct level of detail is
achieved and that we are providing meaningful
information to the end-user of this data.

Recently, Towill provided detailed design surveys to the City of Moreno Valley to support Cycle 1, Safe Routes to School. Both hard copy plan sheets and AutoCAD Civil3D design files were provided to the City so that the City could complete the engineering design. Towill is also currently providing topographic design surveys to the City of Long Beach for various parking lots along the City’s beaches.

Terrestrial and Mobile LiDAR Scanning
The Towill team brings 17 years of terrestrial LiDAR scanning experience. Terrestrial LiDAR scanning can be used to obtain spatial information for features that require a high level of detail or are difficult to reach. It can also be used to gather many data points on complex surfaces, such as rough and uneven ground. The key to successful terrestrial LiDAR scanning technology is knowing when it is the right tool for the job, how to establish control to provide predictable precision within accuracy specifications, and how to combine and augment it with other measurement methods and data products to provide the most efficient service for the tasks at hand. In addition, Towill’s unique business model, which combines complete aerial photogrammetric and LiDAR services, as well as ground-based field surveying augmented with LiDAR, brings a comprehensive mapping tool-set to this contract.

Recently, Towill completed 16 miles of detailed topographic mapping along State Route 91 in Riverside County, utilizing a combination of mobile and terrestrial LiDAR, aerial photogrammetry, and conventional ground surveys. This seamless integration of various advanced and conventional technologies allowed the Towill team to complete this design-level mapping project to Caltrans standards within 120 days. This is a strength the Towill team will bring to the City.

As-Built Surveys and Subsurface Utility Engineering
Towill is a full-service surveying and mapping company and will perform all services described in the RFP except for utility potholing, which will be performed by our subconsultant, AirX Utility Surveyors, Inc. (AirX).

Surveying existing utilities and other surface-visible structures is a common requirement for topographic mapping and one in which Towill excels. Typical tasks in this category could include creating an as-built utility base map from field surveys and/or existing record utility research. All field surveys will be subject to a set of quality control measures developed to minimize and/or mitigate field errors. Additionally, for surveys that require locating and identifying existing buried utilities should it be necessary, Towill has experience

Portion of sample topographic map produced by Towill

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

7 managing the application of a variety of non-intrusive electronic exploration methods as well, such as magnetic scans and ground-penetrating radar. Research will be performed with utility surveyors to acquire information usable in planning field surveys and interpreting the resultant data. Compilation and display of the information will be performed following City requirements, field-checked, and incorporated into the project deliverables.

On many of our construction projects, we record the location of the improvements “as they are built” during construction. The final location of construction improvements such as sewer/water pipes, overhead transmission lines, rail/road/marine infrastructure, etc. can be different than the original design location.

Providing an as-built survey provides a detailed record-drawing document of the constructed item(s) and their associated surroundings.

Traffic Control
Towill is knowledgeable of traffic control procedures and will work with the City so that safety and regulated concerns are met with each task.

Towill has the required traffic control equipment for jobs involving moderate traffic, and when conditions demand the highest levels of safety and control, flaggers with paddle boards can be employed.

Traffic control will be performed following the Work Area Traffic Control Handbook (WATCH) Manual, Manual on Uniform Traffic Control Devices (MUTCD), or as required by the relevant governing agency. Towill’s staff is highly experienced at working safely near roadways, railways, and traffic and following the proper protocols.

Technical Review of Mapping
Due to our team’s history with the subdivision process throughout California, our team is well-versed in the Subdivision Map Act and its processes and knows what to look for when reviewing the work of others. Upon obtaining the Conditions of Approval for a subdivision, we will make a checklist, along with all state, county, and city standard requirements to complete a thorough review. Our staff has the experience necessary to examine a map quickly and accurately to provide the City with a review that is complete and thorough the first time, to avoid unnecessary delay in plan checks. A complete record of all submitted items and the corrections requested is kept to aid in the review of further submittals. It is always recommended that a meeting be held with the submitter along with City staff to review the corrections so that the process can move along smoothly. While these meetings are not always necessary, they can prove helpful in providing experience to the submitters and to City staff.

In addition to final maps and parcel maps, we also have experience checking and verifying lot line adjustments, legal descriptions and plats, and other survey reports and documents that are required for a specific project. All map, plan, and document checks are performed personally or under the direct supervision of a Professional Land Surveyor licensed in the State of California. All check letters will be signed by said surveyor and all plan checks are prepared promptly in keeping with the Subdivision Map Act.

Easements and Vacations
These items all require similar services to review the existing property and property rights and to prepare the necessary documents to complete the acquisition process. Towill can produce legal descriptions and plats for property interest conveyances, record of survey maps, attachment documents and exhibits to accompany parcel map waivers, certificates of compliance, right of way engineering, appraisal maps, ALTA/ACSM land title surveys, and special exhibits including property mapping for presentation or clarifying property-related issues, associated improvements, and other relevant features of interest to real estate professionals and attorneys.

Surveying on or near roadways

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

8 Aerial Mapping Services
Aerial Topographic Mapping
Our clients have discovered that the interpretative power of a photograph combined with the accuracy of a map is a valuable combination. Orthophotos are a required deliverable on nearly every aerial surveying project undertaken by Towill over the last 15 years. Towill has developed special image processing techniques which combine many individual aerial images onto a seamless mosaic. Many of our projects require us to ortho-mosaic hundreds of individual aerial photographs to create a seamless image of the entire project area. This is typically tiled to create files that are of a manageable size in uncompressed GeoTIFF format, with full-project mosaics created using MrSID. We also frequently deliver imagery in JPG or ECW formats. We are aware of small but subtle differences in the imagery headers that can affect correct georeferencing of the imagery in various software packages, including MicroStation, Autodesk Civil3D, and ESRI ArcGIS. The majority of the orthophotos produced are delivered as natural-color imagery. Towill has also produced imagery with NIR, CIR, or Thermal bands as requested. Our medium-format PHASEONE digital camera that is co-located with our airborne LiDAR sensor for simultaneous acquisition of LiDAR data and aerial photography also collects the NIR band in addition to the natural-color bands (RGB), allowing us to easily produce 4-band orthophotos. With the addition of small Unmanned Aerial Systems (sUAS)-acquired imagery, we now have the capability to produce images with even smaller resolutions.

Restricted Airspace – Disneyland Theme Park
We are confident that the City is aware of the
Temporary Flight Restriction (TFR) issued by the
Federal Aviation Administration (FAA) issued
October 27, 2014, in the Notice to Airmen
(NOTAM) number FDC 4/3635. Under this NOTAM,
the FAA classifies the defined airspace as ‘National
Defense Airspace’ which includes an area with a
radius of 3 nautical miles centered on the Anaheim
Convention Center beginning from the surface up
to and including 3,000’ Above Ground Level (AGL).

Access to this airspace requires applying for an FAA
airspace waiver. Towill has direct experience with
the waiver process and has successfully applied for
and gained access to this airspace for several of
our on-call Caltrans projects. For additional
information on NOTAM 4/3635 please see
https://tfr.faa.gov/save_pages/detail_4_3635.html
.

Towill’s asset management photogrammetry for Caltrans

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

9 Photographic Imagery
Towill offers in-house aerial photogrammetric
services and utilizes a well-developed network
of reliable, regionally based aerial photo and
flight service subcontractors to support us
based on the specific type of equipment they
offer and their geographic location. Towill can
provide sUAS as well as fixed-wing and
helicopter acquisition services through our
network of flight subcontractors. Towill
manages and fully plans all aspects of the
aerial photo missions, including establishing
the ground control, camera specifications, photo scale, flight line design, etc. Once the photo mission is fully planned and designed, we will supply the flight team with a TRACK AIR-formatted mission data file for uploading into their flight mission planning software. Photogrammetric mapping represents a very important business line for Towill, accounting for an average of 35% of our company’s annual revenue. Digital orthophotography is a standard deliverable for more than 95% of our photogrammetric mapping projects.

Our clients have discovered that the interpretative power of a photograph combined with the accuracy of a map is a valuable combination.

Airborne LiDAR
Towill has decades of experience performing airborne LiDAR mapping projects. We have completed several thousand square miles of LiDAR data collection throughout the length and breadth of California. Several important features of our approach to airborne LiDAR data collection include calibration of the entire LiDAR system; ground control points; use of sophisticated software to identify, segregate, and remove points that do not represent the ground; and the use of aerial photography to verify the accuracy of the LiDAR digital elevation models.

We have recently completed aerial LiDAR acquisition and mapping for more than 1,185 square miles in two separate areas in San Bernardino County. The project was completed for the Flood Control District with final deliverables including Digital Elevation Models (DEM) and GIS metadata.

Towill owns and operates one Teledyne/Optech ALTM Galaxy T2000 LiDAR system, one Teledyne/Optech ALTM M-300 LiDAR system, two PhaseOne 4-band 100MP aerial camera systems, and two UAV systems.

Eye safety is a high priority during LiDAR data collection. Our sensors are programmed to prevent the laser from firing when the range to the target drops below the preset value that has been established as the minimum range for eye safe operation, which differs from the altitude, as the sensor transmits the beam to the target at an angle.

Aerial photogrammetry for the City of Del Mar
Airborne LiDAR generated map
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

10 Project Related Experiences, References, and Personnel City of Fullerton, On-call Professional Surveying Services, Fullerton, CA Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services.

Maple Avenue Street Reconstruction
Towill performed control surveys that included establishing horizontal and vertical control, as well as locating Orange County centerline monuments. Survey crews completed a topographic design survey using conventional survey methods. The field survey data was used to create a base map in AutoCAD format that included a DTM of the existing ground surface.

Pre/post-construction monument preservation and corner records were prepared and filed with Orange County Surveyors' office.

Rosecrans Avenue Pavement Rehabilitation and Monument
Restoration
Towill provided a design survey and corner records on Rosecrans Avenue from Sunny Ridge Drive to the western city limits. After paving was completed, field crews re-established centerline monuments that had been destroyed and filed corner records with Orange County.

Barris–Fern Area Design Survey
The City planned to upsize sewer mains and include concrete improvements in the area around Golden Hill Elementary School. Towill performed field control, topographic design surveys, and monument preservation surveys. Post-construction corner records were prepared and filed with Orange County.

Acacia Park Topographic Survey
Towill performed field control and topographic design surveys to support the City’s renovation of an existing play area at Acacia Park. The survey data was used to create a base map delivered in AutoCAD format using the City’s layering standards for the grading and drainage design.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
City of Fullerton
David Grantham, PE
714.738.6853 Tel
[email protected]

Melissa Rendon, PE
714.738.6886 Tel
[email protected]

Towill’s Role
Prime Consultant

Team Members Involved and Role
James Rios, Project Manager
Marvin Miller, Principal in Charge
Chris Johnson, Office Survey Lead
Daniel Ortega, Project Surveyor
Nick Lewis, PLS Party Chief

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

11 City of Irvine, On-call Professional Land Surveying Services, Irvine, CA Towill has been providing on-call professional surveying services to the City of Irvine since 2013. Towill is currently under contract to provide survey support services including but not limited to construction surveys, monumentation preservation, preparation and filing of corner records, and topographic surveys.

Culver Drive and University Drive Intersection Improvements Towill provided construction surveying services to support the Culver Drive/University Drive Intersection Improvements project. The project involved widening the roadway; reconstructing the concrete median, sidewalks, curbs and gutter, etc.; streetlight relocation; traffic signal modification; extension of an existing channel box culvert; installation of a landscape and irrigation system; signage, striping, and pavement markings; and relocation and adjustment of Irvine Ranch Water District (IRWD) water facilities. Towill’s tasks included performing a centerline survey and monumentation recovery; detailed topographic surveys of the streets, sidewalks, and neighboring properties; developing a digital terrain model sufficient in detail to support 1.0’ contour generation; street cross-sections at 50.0’ intervals; construction staking; as-built surveys; and centerline/property corner monument preservation. Final survey documents were delivered in AutoCAD format.

Alton Parkway Pavement Rehabilitation – I-5 to Technology Drive East Towill established horizontal and vertical project control and set control monuments outside of the anticipated construction area for future use by the design and construction teams. Following the completion of the project control tasks, Towill performed an extensive topographic design survey using conventional ground survey methods. The field survey topographic data was tied to the project's horizontal and vertical control and processed for delivery in DGN format. The mentioned data was also used to create a Digital Terrain Model (DTM) of the existing ground surface. Research of Orange County and the City of Irvine cadastral maps, corner records, and centerline tie notes were conducted as part of the centerline survey.

Towill also prepared legal descriptions and plats, performed pre- and post-construction monument preservation, and filed corner records with Orange County following the California Land Surveyor’s Act.

Jamboree Pedestrian Bridge
Project horizontal and vertical control surveys were performed using GPS and digital leveling techniques. Record centerline
monumentation was researched, field surveyed, and tied into the horizontal and vertical project control. Terrestrial LiDAR and conventional ground survey methods were used to complete the topographic design survey covering the Project Area of Interest (AOI). Field survey data was processed for delivery in DGN format along with an extensive Digital Terrain Model (DTM) of the existing ground surface. Upon completion of the potholing tasks, Towill surveyed the location of each and tied the utility information obtained from the pothole activity to the project's horizontal and vertical control.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
City of Irvine
Reza Jafari
949.724.7545 Tel
[email protected]

Towill’s Role
Prime Consultant

Team Members Involved and Role
James Rios, Project Manager
Marvin Miller, Principal in Charge
Chris Johnson, Office Survey Lead
Nick Lewis, PLS Party Chief
Oliver Rocha, Certified Party Chief

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

12 City of Rancho Cucamonga, On-call Design and Construction Surveying Services, Rancho Cucamonga, CA
Towill is providing professional design and construction surveying services to the City of Rancho Cucamonga under an on-call contract.

In addition to the services highlighted above, Towill is responsible for the coordination and management of the required survey services with the project construction crew and City personnel.

Design survey deliverables include signed and dated original survey notes, point data in ASCII file format, and base map data in AutoCAD format.

Major Arterial Pavement Rehabilitation Project for Highland Avenue and Hermosa Avenue
Towill provided centerline control establishment, monument preservation, and construction support services along Hermosa Avenue from Banyan Street to Wilson Avenue and along Highland Avenue from Archibald Avenue to Haven Avenue. Towill’s services included the establishment of horizontal and vertical project control utilizing GPS and digital levels. Towill then performed a pre-construction monument preservation survey of 31 centerline monuments and associated ties (four for each monument). Upon completing the field verification, Towill prepared and filed pre-construction corner records with the County of San Bernardino. Towill was tasked with construction surveying tasks for this project, including setting construction stakes, reviewing the project plans, and checking the computations.

Upon completion of the construction, monuments that were disturbed during construction were reset by Towill field personnel. Signed corner records were then prepared for each reset monument and filed with the San Bernardino County Surveyors’ office.

Church Street Pavement Rehabilitation Project
Towill performed a survey for this pavement rehabilitation construction project along Church Street from Millikan Avenue to Haven Avenue. Tasks included establishing horizontal and vertical project control using GPS and digital levels, performing a topographic survey of the project site including all visible features and utilities, performing a monument preservation survey before construction, filing pre-construction corner records with the County of San Bernardino, and performing post-construction monument perpetuation upon completion of the construction. Signed post-construction corner records were filed with the San Bernardino County Surveyor.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
City of Rancho Cucamonga
Romeo David
909.774.4070 Tel
[email protected]

Towill’s Role
Prime Consultant

Team Members Involved and Role
James Rios, Project Manager
Marvin Miller, Principal in Charge
Chris Johnson, Office Survey Lead
Daniel Ortega, Project Surveyor
Nick Lewis, PLS Party Chief
Oliver Rocha, Certified Party Chief

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

13 City of San Diego, As-needed Land Surveying Services, San Diego, CA Towill was awarded an as-needed land surveying consultant contract through the Public Works Department in support of the Land Surveying Section. The City had amassed a significant backlog of Capital Improvement Projects (CIP) and sought to increase its capacity through direct land surveying contracts.

Design and Topographic Surveys for Capital Improvement Projects Towill has been awarded a total of 18 task orders comprising survey support for street and utility rehabilitation engineering projects across the City. These CIP project surveys begin with a record map and document review of the preliminary files provided by the City, followed by additional record map and document research (including quasi-public and private survey records) when necessary.

Next, field surveys are conducted to identify and measure existing survey monumentation (horizontal and vertical control as well as boundary including non-record monuments of historical value and significance) with a standard of care adhering to the City’s minimum accuracy standards for control and boundary measurement (GPS and Total Station).

The field data and notes are reduced and right of way lines are resolved and checked by professional survey staff to provide the foundation for the engineering drawings. Design and topographic data are then collected per the City’s mapping standards (data collected using City topo codes and processed through MicroStation and InRoads software). This data includes but is not limited to the following features required to support engineering analysis and design: pedestrian ramps, curbs, gutter, paving sections, drainage structures, wet and dry utility location, striping, signage, lighting, traffic signals, and other fixed works located within and adjacent to the public right of way. Towill works directly with the Land Survey Section staff to tailor the deliverables to meet the department’s needs.

Street Survey Monument Rehabilitation Projects
Towill has been awarded three task orders to provide
specialized services to repair existing street survey
monuments that had become damaged and constituted road
hazards. The existing condition of these monuments varied from cracked frames and broken lids to new rings improperly welded and broken free from the original frame. Towill
performed site visits to document and photograph the existing condition of each monument and address access, safety, and traffic control considerations. Towill worked together with a subconsultant to develop, submit, and execute traffic control plans, perform the site demolition, preparation, frame
welding, and concrete encasement of these monuments in 24 to 48 hours (total time on each site), completing each task within seven business days upon approval of traffic control plans. This approach to providing a specialized service simplified and streamlined the process to accomplish the needed repairs by performing the work through the as-needed services contract rather than routing through the City’s Public Works Department’s internal process.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
City of San Diego
John Butcher
858.627.3208 Tel
[email protected]

Towill’s Role
Prime Consultant

Team Members Involved and Role
Jake Kruger, Project Manager
Lorraine Amenda, Aerial Mapping
Sara Reed, LiDAR

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

14 Orange County Transportation Authority, OC Streetcar Construction Management Services, Orange County, CA
As a member of the construction management team, Towill performs a wide range of construction survey support services for the OCTA Streetcar project. This project is in coordination with the City of Santa Ana and the City of Garden Grove to construct a new east-west double-track modern streetcar in Orange County between the Santa Ana Regional Transportation Center in Santa Ana and the Harbor Boulevard/Westminster Avenue intersection in Garden Grove. The purpose of the project is to improve transit connectivity and transit accessibility, increase transit options, relieve congestion by providing alternative mobility options in a manner that is sensitive to the community’s character, and provide benefits to the environment through improved air quality.

The Project consists of the following features:
• 4.15 miles of new trackway (ties/ballast) installed within the Pacific Electric Right of Way (PEROW) owned by OCTA and the traffic lanes of Santa Ana Boulevard and Fourth Street (on concrete track slab), consistent with the approved
Locally Preferred Alternative (LPA) and the approved Environmental Documents • A new double-track bridge located immediately north of the existing Pacific Electric Santa Ana River Bridge, and a new bridge over Westminster Boulevard
• Railroad Signaling and Communications systems for operations and control, and modifications to traffic signals along the route
• Two (2) at-grade railroad crossings with standard railroad crossing gates and flashers • Ten (10) stations in the eastbound direction and ten (10) stations in the westbound direction. Some of the stations are shared center platforms. Stations will have passenger amenities such as lighting, shelters, seating, ticketing/fare collection, and signage. • A Maintenance and Storage Facility (MSF) to house eight (8) vehicles, operations and maintenance staff, and equipment on a 2.4-acre site.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
PGH Wong
Guy Nakano, PE
916.335.9005 Tel
[email protected]

Towill’s Role
Subconsultant

Team Members Involved and Role
James Rios, Project Manager
Marvin Miller, Principal in Charge
Chris Johnson, Certified Party Chief
and Associate Surveyor
Daniel Ortega, Project Surveyor
Nick Lewis, PLS Party Chief
Oliver Rocha, Certified Party Chief

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

15 Los Angeles County Department of Public Works, As-needed Surveying and Mapping Services, Los Angeles County, CA
Under a multiple-year, as-needed surveying and mapping services contract, Towill provided mapping for multiple task orders for projects located throughout Los Angeles County. With each task order, county staff provided Towill with the mapping limits and other project specifications such as map scale, contour interval, and orthophoto resolution. Towill developed a photo control survey plan and submitted this plan back to county staff who performed the field survey work. Once all aerial panels had been set, county staff notified Towill that the job was ready to fly and we mobilized the flight crew. Task orders involved mapping various types of terrain, including deserts, rugged mountains, and coastal plains, as well as extensive urban development areas.
87th Street East and 90th Street East Bike Lane
Towill provided mapping for approximately four miles of 87th Street East and 90th Street East near Sun Village in Los Angeles to support the design of bike lanes. The mapping consisted of a 120' strip for approximately 22,000 linear feet of roadway. The ground control was placed, surveyed, and targeted by the County of Los Angeles. The mapping was centered along the existing roadway. The mapping produced for this task was at a scale of 1" = 40' with a 1.0' contour interval. Natural color digital orthophotography was also produced. Achieving well-balanced orthophotography was a challenge—the mapping corridor was extremely monotone, as would be expected in the desert. The mapping was delivered in MicroStation design file format, conforming to the County of Los Angeles’ CAD standards.

Public Works Headquarters Renovation
Towill prepared an ALTA and Record of Survey for the
LACDPW Headquarters facility in Alhambra. The project
included the creation of a base map of the facility using photogrammetric mapping techniques at 1"=20' and the
development of a Digital Terrain Model (DTM) sufficient in detail for generating 1.0' design contours. This base map was supplemented as necessary with field
topographic surveys to meet the requirements of an
ALTA/NSPS Land Title Survey. In addition to the ALTA, a Record of Survey was prepared and submitted to the
County of Los Angeles for review and recordation. The
field crew revisited the site to tie in property corners and to identify some of the features collected but
unidentifiable from the aerial imagery.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
Los Angeles County Department of
Public Works
Louis Romero, Capital Projects Mgt.

Associate
626.458.5144 Tel
[email protected]

Towill’s Role
Prime Consultant

Team Members Involved and Role
James Rios, Project Manager
Marvin Miller, Principal in Charge
Lorraine Amenda, Aerial Mapping
Sara Reed, LiDAR
Chris Johnson, Office Survey Lead
Daniel Ortega, Project Surveyor
Nick Lewis, PLS Party Chief
Oliver Rocha, Certified Party Chief

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

16 Southern California Edison, Master Services Agreement, Land Surveying Services, Southern CA Towill is currently providing full land surveying and mapping services to support design and construction throughout Southern California.

San Onofre Nuclear Generating Station (SONGS) Decommissioning Topographic, Boundary, and Exhibit Surveys, Legal Descriptions & Plats
Towill has been supporting Southern California Edison (SCE) with on-call Land Surveying and Mapping services over three successive contracts. Towill has performed aerial and terrestrial topographic mapping, boundary surveys, and land surveys to support the decommissioning project at SONGS and the surrounding cities and community. Task orders have included aerial topographic mapping of the generation station, substations, and surrounding infrastructure; locating the historic and current mean high tide line (MHT) property boundary; license and lease boundary renewals and reconfigurations with the USN and State Parks for future occupation; retracing historic land descriptions including the railroad and SR-1 (Interstate 5); plat and legal description creation to facilitate extinguishing easements for the emergency alarm system; and mapping the existing overhead electric facilities for engineering analysis and transfer between SCE and SDG&E.

West of Devers Project
Towill is responsible for providing horizontal and vertical GPS control surveys consisting of 190 aerial targets along the 45-mile-long West of Devers project’s alignment
across Riverside and San Bernardino Counties. Field
survey crews set and located each target based on flight plans provided by SCE’s photogrammetric consultant. The aerial targets were set in varying terrain, including urban city streets, mountainous areas, and sandy desert. The
aerial control targets were tied into the previous West of Devers control provided by SCE using static and fast-static GPS methods. Towill was also tasked with preparing the
acquisition and condemnation packages (legal
descriptions and plats) needed for the project, as well as updating the land net mapping (basemap). In addition, multiple topographic surveys have been performed for both highway and railroad crossings.

Rector to Riverway No. 2 66kV Design Project
This project involves providing preliminary design land surveying and aerial mapping services and deliverables in support of the engineering and design of a new 13-mile overhead and underground 66kV sub-transmission circuit connecting Rector Substation and Riverway Substation, located in the City of Visalia and unincorporated areas of Tulare County. Towill is responsible for providing horizontal and vertical GPS control surveys, boundary and right of way base map creation, aerial topographic mapping and planimetry, river cross-section surveys, underground utility location, mark out, utility surveys, and topographic surveys in support of this project.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
Southern California Edison
Ryan Waddell, PLS
626.607.6808 Tel
[email protected]

Towill’s Role
Prime Consultant

Team Members Involved and Role
Jake Kruger, Project Manager
Marvin Miller, Survey Task Manager
Lorraine Amenda, Aerial Mapping
Chris Johnson, Associate Surveyor
Daniel Ortega, Project Surveyor
Oliver Rocha, Certified Party Chief
Nick Lewis, PLS Party Chief

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

17 California Department of Water Resources, On-call Land Surveying Services, Statewide, CA Under a multi-year on-call land surveying service contract, Towill provided a wide range of land surveying and mapping services supporting the mission of the California Department of Water Resources (DWR). Towill was the leading provider to DWR of aerial photogrammetry and airborne LiDAR services and was responsible for these services on more than 100 task orders since January 2016 and was recently selected for a new contract.

Lake Perris Dam Seismic Retrofit Project
Lake Perris is the southernmost State Water Project Facility and the southern terminus of the California Aqueduct. DWR identified potential seismic safety risks in a section of the foundation of Perris Dam. Towill provided a variety of surveying services, including horizontal and vertical control verification, as-built surveys, construction layouts, earthwork quantity surveys, 3D laser scanning, digital terrain models, and quality assurance surveys.

Due to the age of the design survey data, changes to the site had occurred since the data was obtained. To capture and delineate these changes, we developed an as-built digital terrain model of the dam surface repair area. Since the rock blasting area was difficult to access with conventional survey methods, we determined that utilizing 3D laser scanning to collect the data was the best solution.

This enabled us to provide a rapid turnaround on monthly quantity verification—the quantity results were measured and reported within 24 hours of the request. We also developed a field-to-finish system to expedite the processing and reporting of field survey data.

Geodetic Control Network, LiDAR, and Orthoimagery for the State Water Project Towill worked with representatives of DWR’s Geodetic and O&M Branch to design a survey approach for inventorying more than 750 miles of rivers, reservoirs, canals, and pipelines which comprise the State Water Project. This project was separated into two phases. Phase 1 included approximately 220 miles of the California Aqueduct, and Phase 2 included approximately 530 miles. The objective of the project was to produce color orthophotography, digital terrain models, and horizontal and vertical ground control at one-mile intervals over the extent of both phases.

The survey control network was established utilizing existing DWR subsidence monitoring benchmark monuments located at one-mile intervals along the length of the project. GPS surveying technology was used to accomplish the control survey. Airborne LiDAR data was captured using rotary and fixed-wing aircraft. The LiDAR data was acquired at a nominal density of nine points per square meter. Natural-color (RGB) aerial imagery was acquired concurrently with the LiDAR flights (simultaneous acquisition). The LiDAR data was used to generate digital elevation models (DEMs) for use with GIS and triangulated irregular network (TIN) surfaces for use with CAD. Finally, controlled aerial photography was used to develop natural-color digital orthophotography covering the project corridor.

Task orders under this contract have been completed on schedule.

Owner/Client Reference
California Department of Water
Resources
Patrick Tami, PLS
916.657.5224 Tel
[email protected]

Towill’s Role
Prime Consultant

Team Members Involved and Role
James Rios, Survey Task Manager
Marvin Miller, Survey Task Manager
Jake Kruger, Survey Task Lead
Lorraine Amenda, Aerial Mapping
Sara Reed, LiDAR
Chris Johnson, Associate Surveyor
Daniel Ortega, Project Surveyor
Nick Lewis, PLS Party Chief
Oliver Rocha, Certified Party Chief
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

18 Organization Chart
The organization chart below depicts the roles and duties of our proposed staff for this on-call contract with the City. Please refer to the full personnel resumes in Appendix A.

*Key personnel will be available to the
extent proposed for the duration of the
project, acknowledging that no person
designated as "key" to the contract shall
be removed or replaced without the prior
written concurrence of the City.

Name Position Availability*
James Rios Account/Project Manager 100%
Marvin Miller Project Principal 50%
Jake Kruger QA Manager 50%
Chad Angrisani Safety Coordinator 75%
Chris Johnson Office Survey Lead 75%
Daniel Ortega Project Surveyor 75%
Lorraine Amenda Aerial Survey Lead 50%
Sara Reed Airborne LiDAR Specialist 50%
Nick Lewis Field Survey Lead 75%
Oliver Rocha Certified Party Chief 75%
Kyle Walton SUE Survey Lead 50%

ACCOUNT/PROJECT MANAGER

James Rios, PLS

PROJECT PRINCIPAL

Marvin Miller, MBA, CP

OFFICE SURVEY LEAD

Chris Johnson, LSIT

AERIAL SURVEY LEAD

Lorraine Amenda, PLS, CP

FIELD SURVEY LEAD

Nick Lewis, PLS

QA MANAGER
Jake Kruger, PLS

PROJECT SURVEYOR

Daniel Ortega, PLS
15 Specialty Staff Available
10 Field Crew Staff Available
10 Office Staff Available

CERTIFIED PARTY CHIEF

Oliver Rocha, LSIT

SAFETY COORDINATOR
Chad Angrisani, SA
AIRBORNE LiDAR SPECIALIST

Sara Reed, CP, LSIT

SUE SURVEY LEAD
Kyle Walton (AirX)

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

19 Overview of Management and Supervision of Project Team Towill has assembled an experienced team with exceptional technical expertise, professional qualifications, and a commitment to responsiveness in order to meet this contract’s objectives. With the depth and breadth of our in-house resources, we are prepared to provide the City with appropriate staff and equipment coverage, on short notice, for the life of the contract.

Leading the team as Account/Project Manager will be James Rios, PLS.

James has 27 years of experience and has successfully managed on-call contracts for many clients, including the Cities of Fullerton, Rancho Cucamonga, Irvine, and Huntington Beach, as well as Orange County Public Works. His success on tasks, large and small, can be attributed to his attention to detail, adherence to clearly established production procedures, Quality Assurance and Quality Control (QA/QC), and accountability for tasks completed. James will be the direct contact and is responsible for the administrative tasks of this on-call contract, which includes project coordination, staff assignments, invoicing, daily reporting, COI requirements, and safety oversight. He will attend the city meetings in-person, or via Teams/phone calls. James is adept at project control and oversight and will work seamlessly with the City.

In addition, our proposed team has multiple staff that are cross-trained in surveying and mapping. Our staff’s versatility increases the depth and range of skills provided to our clients, which improves the quality of our services and reduces costs. Towill brings personnel with hands-on working knowledge of every step involved in project execution. We are confident that the City will enjoy working with our team members. Additional information about their current positions, education, experience, and professional credentials is shown in the key personnel resumes.

Towill Team Member Subconsultant
Towill is pleased to bring AirX for Subsurface Utility Engineering. We have teamed with AirX for many years.

All other services described in the City’s RFP fall directly within Towill’s area of expertise. This, coupled with our large resource pool of trained land surveying and aerial mapping professionals, means that Towill will not require the assistance of other subconsultants to provide these services to the City. This will benefit the City with a more cohesive team that can respond quickly to both land surveying and aerial mapping/survey task orders.

AirX is a Subsurface Utility Engineering (SUE) company offering a comprehensive package that includes vacuum excavation; utility locating services including contract locating in support of USA One Call Center; ground penetrating radar (GPR); video inspection (CCTV) of ducts, sewer, and storm drains; cathodic protection; traffic-control plans; permit processing; traffic control equipment and set up; documentation; and road surface repairs. AirX has been providing SUE services in Southern California since 2000 and is a California state-certified Small Business Enterprise and California Public Utilities Commission (CPUC) Woman-Owned Business Enterprise.

Compliance with Federal, State, and Local Funding Requirements Towill has contracted with government funding agencies at all levels and is adept at navigating diverse funding sources. We excel in adapting to shifting City objectives driven by funding, priorities, politics, and approvals. Our commitment to your mission is unwavering, and we recognize the need for detailed project reporting and ensure a continuous flow of information to meet the needs of boards, stakeholders, and funding agencies.

Towill has the knowledge and
experience to select the tools
that provide our clients with
the most budget-friendly and
time-efficient approaches to
collecting the data they need.

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

20 Additional Information and Description of Resources
Towill understands that tasks from this on-call professional services contract will be assigned by the City through a task order process. Towill approaches each task order received as unique, which is why we develop a specific plan that is tailored to meet project criteria, such as completion date, budget, forms, format, safety concerns, environmental issues, permits, rights-of- entry, methods of access, travel, and final deliverables.

Towill’s Account/Project Manager, James Rios, PLS, will serve as the single point of contact and will meet with and communicate with the City and discuss each specific request for surveying services. This approach has earned Towill an excellent, well-known reputation for anticipating and resolving problems before mobilization. The figure to the right demonstrates the proposed process for each task order beginning with the survey request and draft task order, preparation of the cost proposal, communication and discussions with City management and staff, to submission of the final task order and cost estimate. We believe this proven process will be key to successfully delivering task orders.

Upon approval of the task order, the team will hold a kickoff meeting where the focus will be on delivering a consistent, efficient, and quality product.

Instructions to the project team will be developed and distributed to all team members. These instructions may include communication protocols, critical path schedules, budgets, technical standards, scope of work, required deliverables, and quality control plans and procedures.

Work Plan and Quality Control Plan Preparation: James and appropriate key personnel will develop a project work breakdown structure and quality control plan that will provide an approach to meet or exceed the specific task order criteria. They will follow the California Land Surveyor’s Act, California Subdivision Map Act, City standards and specifications, and professional land surveying standards for those areas not covered by the acts and standards. The specific approach will include, at a minimum, survey and mapping methodologies, equipment and software to be used, schedule and associated milestones, deliverable requirements, health and safety concerns, and budget. The work and quality control plans will be reviewed with the City and any necessary adjustments will be made to incorporate concerns.

Project Kick-Off Meeting and Status Meetings: Once the City issues a Notice to Proceed (NTP) to Towill, any required meetings and discussions to review the scope of work, methodologies, interim deliverables, contract requirements, and final deliverables will be scheduled. James will finalize the work plan and assign Towill resources for the necessary personnel and equipment to meet the task order requirements. The City has our commitment that resources will be mobilized quickly so that project schedules are met. Towill is fully capable of performing multiple mapping and surveying activities concurrently throughout the life of the contract.

Survey Request
from City Staff
Prepare Draft
Task Order and
Cost Estimate
Discuss and
Negotiate
Execute
Task Order
Perform
Surveys
Submit
Deliverables
Task Order
Close-out

TASK /WORK ORDER PROCESS
QA/QC
Process
Project Follow-up
with City
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

21 James will review the progress of all active task assignments with the City at an interval acceptable to the City to discuss budget, schedule, and milestone deliverables. These meetings will continue as necessary through each phase of the project until the final deliverable package has been reviewed and released to the City.

Planning and Managing Resources, Costs, and Schedules: To assist our management staff in tracking project costs and resources, several types of customized reports are generated by Towill's accounting department. The information contained in these reports is obtained from daily time sheets completed by all staff and from contract records. This timely process allows managers to closely track, examine, and analyze project costs in detail weekly. The advantage of this process is that we can quickly identify and address potential problems and make any necessary adjustments in our production processes and our allocation of resources to keep costs under control and the project on schedule. Towill’s staff is used to rapid mobilization and overtime/weekend work when projects accelerate.

Reporting: Towill requires all project managers to maintain an accurate and easily understandable record of the project as part of its general business practice. The activities of office and field staff are tracked and managed through regularly maintained timesheets that become part of the job record. It is our standard practice to submit a Monthly Status Report in a format customized to meet each client's specific needs and detail requirements. Each Monthly Status Report typically provides a summary of 1) the status of all active work on a project and/or contract, 2) work anticipated to be accomplished in the next reporting period, 3) challenges and proposed solutions, and 4) adherence to budgets which provides a status of all active work and their components.

Project Completion: No deliverable will be released to the City in final format until James as Account/Project Manager and Jake as QA has reviewed all elements and authorized its release. For ease and expediency during all phases of the project, as well as the final release to the City, all data can be transmitted digitally or in person, whichever method is preferred by the City. Follow-up will also be performed by our Project Manager to ensure the complete satisfaction of the City and to adjust the approach and implementation for each project phase, or task order, based on the lessons learned.

First-Time-Right Deliverables to the City: We believe quality assurance/quality control (QA/QC) is solely the consultant's responsibility. Our clients should not be burdened with performing time-consuming quality checks to verify that the deliverables meet their expectations. To eliminate costly corrections and revisions, Towill approaches quality control with the premise that it is best to perform quality verification at all stages of planning and technical task execution. Please see our Quality Control/Quality Assurance Program narrative beginning on page 23.

Survey Safety: Towill places primary importance on the safety of our employees and the public. We are very experienced at working safely near roadways, railways, and traffic. Our commitment to safety begins with each new hire; new employees are immediately given safety orientation training. Management training is given to all staff with responsibility for employees, from supervisors to the managerial level.

We incorporate relevant safety concerns in our Daily Work Assignment Sheet. We have site-specific safety meetings to discuss safety and investigate hazards for the particular site. Additionally, many of our field staff are E-Rail Safe Certified, and we conduct (and document) daily Job Hazard Analysis forms on a digital application as well as conduct bi-weekly Tailgate Safety Meetings.

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

22 Fee Schedule
LAND SURVEY & AERIAL MAPPING SERVICES – EFFECTIVE SEP 1, 2023 – AUG 31, 20241 Name/Title/Classification Hourly Rate
Marvin Miller - Principal-in-Charge .......................................................................................................................................... $245.00 James Rios - Project Manager ................................................................................................................................................. $198.00 Jerome “Jake” Kruger - QA Manager ....................................................................................................................................... $240.00 Daniel Ortega - Project Surveyor .............................................................................................................................................. $163.00 Lorraine Amenda - Aerial Survey Lead ..................................................................................................................................... $210.00 Chris Johnson* - Office Survey Lead ....................................................................................................................................... $189.00 Nicolas Lewis* - Field Survey Lead.......................................................................................................................................... $195.00 Oliver Rocha* - Certified Party Chief ........................................................................................................................................ $189.00 Chad Angrisani – Safety Coordinator....................................................................................................................................... $137.00 Sara Reed – Airborne LiDAR Specialist ................................................................................................................................... $162.00 Survey Technician (Office)........................................................................................................................................................ $110.00 Geomatics Manager ................................................................................................................................................................. $210.00 Senior Geomatics Analyst ........................................................................................................................................................ $165.00 Geomatics Analyst .................................................................................................................................................................... $125.00 Geomatics Technician .............................................................................................................................................................. $105.00 CADD Technician ...................................................................................................................................................................... $115.00 Project Coordinator................................................................................................................................................................... $114.00 Project Assistant ...................................................................................................................................................................... $ 75.00

Prevailing Wage Rates by Field Survey Personnel Classifications – IUOE Local 12 Licensed Party Chief................................................................................................................................................................. $195.00 Certified Party Chief ................................................................................................................................................................. $189.00 Party Chief ................................................................................................................................................................................ $184.00 Chain Person ............................................................................................................................................................................ $173.00 Apprentice ................................................................................................................................................................................ $135.00 NOTES:
• Staff marked with an asterisk (*) denotes prevailing wage earner. • As required by the IUOE Local 12, field survey personnel and crews are billed in increments of 4, 6, or 8 hours only. • Field survey crew rates are inclusive of the survey vehicle, vehicle mileage up to 50 miles from the Orange, CA office, conventional and GPS survey equipment, and standard safety equipment.

SPECIAL LABOR RATES
Labor Description Hourly Rate
Hazmat Crew Supplement ........................................................................ Field Survey Crew Rate plus $10.00 per Person per Hour Night Shift .......................................................................................................... Field Personnel Rate plus 12.5% Premium Per Hour

AUTHORIZED OVERTIME LABOR RATES
Labor Description Hourly Rate
Saturdays and over 8 hours on Weekdays ................................................................................................ 1.5 times the Regular Rate Sundays and Holidays ................................................................................................................................ 2.0 times the Regular Rate

EQUIPMENT AND OTHER DIRECT COSTS
Equipment Description Rate
Terrestrial Static/Aerial LiDAR Sensor ........................................................................................................Quote Provided per Project Aerial Digital Image Sensor .........................................................................................................................Quote Provided per Project Unmanned Aerial System (UAS) ..................................................................................................................Quote Provided per Project AirX SUE Services ....................................................................................................................................... Quote Provided per Project

Client shall pay the costs, plus 10%, for any applicable governmental fees, title company charges, subconsultant fees, outside vendor/subcontractor costs, reproduction costs, rental vehicles and boats, rental and specialty equipment, consumable materials, digital delivery media, and delivery or messenger services incurred on Client’s behalf.

1 Towill, Inc. reserve the right to negotiate adjustments to the hourly rates prior to the beginning of each new contract year.

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

23 Quality Control/Quality Assurance Program
Quality starts with excellent project management. Towill’s project management methodology for virtually all project undertakings can be simply characterized as a step-by-step process or what is commonly referred to as Critical Path Method (CPM). All survey and remote sensing projects consist of numerous independent activities that interact in a complex manner. Towill’s project management team utilizes this step-by-step technique to define those activities that are both critical and non-critical (work breakdown structure), the time required for their completion, and how each activity is related to the previous and next activities.

Ultimately, this methodology serves to define and allow for the efficient scheduling of each activity, thus ensuring the successful on-time completion of the project.

In addition to the project management method described above, one of the key elements of the Towill approach to project management is the importance placed on communication. This approach is firmly centered on frequent and efficient communication with our clients during each phase of the project. We understand that the difference between a successful project and one that falls short of expectations is often the result of a breakdown in communication.

Towill acknowledges the need to provide direction and facilitate effective day-to-day communication to create a seamless and cost-effective approach to the completion of all project undertakings. Towill has the right combination of management depth and technical expertise that ensures our clients will receive the highest quality service, cooperation, communication, and data deliverables. Moreover, our staff understands that consistent project support is imperative in not only earning but also retaining trust with our clients.

Effective project management at Towill begins with a qualified team and an efficient organizational structure. The key element in the organization of a project of this size is the chain of accountability. The second element required for effective and successful project management is a detailed Project Plan. On larger project assignments Towill will prepare a Project Plan that describes:
 Inspection schedules, deliverables, and key production milestones  Quality Control procedures for all work and review phases  Deliverables and Acceptance Criteria
 Communication strategies
 Potential risks and risk mitigation
Towill recognizes that contracted deliverables that meet the specifications are the key element to successful performance on every project assignment. The ability to provide such deliverables is documented through our satisfied clients. We place utmost importance on adhering to project specifications and our quality control procedures. Our philosophy is to ensure on-time delivery of services that meet our client’s requirements. We emphasize quality control from the initial proposal preparation and submission through the final delivery and acceptance of finished deliverables. In-process production reviews ensure accuracy and completeness during the production process and eliminate corrections and production delays.

Towill subscribes to the Plan, Do, Check, Act principles of Quality Management.

1. We establish a comprehensive Quality Management Plan for each project that includes specific data definitions, rules, and a comprehensive deliverables checklist.

2. We Do the work according to our Plan.

3. We Check our work to determine if it is consistent with our Plan.

4. We Act to modify our work and update our Plan when and if necessary.

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

24 Knowledge and Experience
As noted in the cover letter, our team of professionals have an average of 25 years of experience in the various geospatial disciplines. Many of these dedicated individuals have spent their entire careers advancing their knowledge and practical know-how, as well as serving as leaders in professional organizations that have tirelessly worked to continually develop, improve, and/or adopt emerging technologies and procedures.

Some of our professional team have been called “pioneers” as they were on the cutting edge of integrating computerized drafting, GPS, digital image sensors, LiDAR, etc. into their survey tool kit. The vast technical experience of our professional team coupled with their complete knowledge and understanding of the standards, codes, specifications, and acts listed on page 9, “Knowledge & Experience” of the City’s RFP, highly qualify Towill for this contract. Towill’s in-house capacity is well-suited for this type of on-call project, the chart below shows the strength of our technical professionals.

TOTAL IN-HOUSE CAPACITY—CALIFORNIA
Name Classification Name Classification Name Classification Amenda, Lorraine PLS, #7217 Vielbaum, Matthew PLS, #9506 Nguyen, Peter New LSIT* Borges, Frank PLS, #7922 Vue, Touko PLS, #9797 Peterson, Chase New LSIT* Boyea, Angela PLS, #8143 Aimaitijiang, Tom LSIT, #9251 Reed, Sara LSIT, #7259 Duran, Sergio PLS, #9821 Duran, Oscar LSIT, #8874 Rocha, Oliver LSIT, #5033 Eyerman, James PLS, #6336 Dzul, Maxim LSIT, #9252 Schlangen, Alex LSIT, #9048 Gonzales, Analisa PLS, #9496 Gregory, Frederick LSIT, #7701 Knecht, Kristine EIT, #169206 Kennada, Mike PLS, #5642 Gwizdak, Walter LSIT, #8966 Gonzales, Analisa EIT, #155684 Kruger, Jake PLS, #8462 Johnson, Chris LSIT, #5129 Amenda, Lorraine CP, #1517 Lewis, Nicholas PLS, #8105 Knecht, Kristine LSIT, #8814 Maalouli, George CP, #1480 May, John G. PLS, #6186 Lopez, Jacob LSIT, #8970 Meme, Kenneth CP, #1158 May, John T. PLS, #8570 Luka, Teresa LSIT, #7196 Miller, Marvin CP, #1025 Ortega, Daniel PLS, #9569 McNeil, Ian LSIT, #3818 Reed, Sara CP, #1634 Pickard, Menashe PLS, #9435 McNeil, Jared LSIT, #8584 Guerrero, Miguel GISP, #58112 Rios, James PLS, #8823 Moniz, Jason LSIT, #7867 Boyea, Angela CFedS, #1776 PLS: Professional Land Surveyor  LSIT: Land Surveyor-in-Training  CP: Certified Photogrammetrist  CFedS: Certified Federal Surveyor  GISP: Certified Geographic Information Systems Professional  EIT: Engineer-in-Training *Note that some brand new LSIT’s do not have a number assigned from BPELSG as of this submittal

Conclusion
We thank you for your time and consideration of our proposal to perform surveying and mapping services for the City of Anaheim. We are truly excited about working on the contract and continuing to build our relationship with the City and your team members.

Key Reasons to Select Towill
 Towill has worked on projects with multiple cities within Orange County, including the City of Anaheim. We enjoy working on projects that directly impact our community.  Towill’s close proximity to the City means that we can quickly respond to in-person meeting requests, enhancing our responsiveness and availability.  Combining the average of 25 years of experience of the key staff assigned to this project with the most advanced tools in the geomatics profession, Towill represents a team that can provide all services required by the City under this contract.
 The City of Anaheim gets 68 years of geomatics excellence – we love surveying! Appendix A
Resumes

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

JAMES RIOS, PLS | ACCOUNT/PROJECT MANAGER
James Rios has 27 years of professional experience as a Project Manager, Party Chief, and Mapping Manager. His extensive experience includes performing field calculations, right-of-way and boundary surveys, and mapping.

He has organized, managed, and executed QA/QC plans and has managed a broad range of assignments for various projects requiring extensive knowledge of land surveying and mapping. Mr. Rios will serve as the single point of contact with the assigned City representative. As the account manager, he will be responsible for contract administration, preparation of estimates, technical scopes of work, technical and administrative reporting, and invoices. He will oversee all of the project team group leaders and their functions including those of the safety coordinator.

City of Fullerton, On-call Professional Surveying Services, Fullerton, CA: Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services. Task orders to date include Maple Avenue street reconstruction, Rosecrans Avenue pavement rehabilitation and monument restoration, Barris-Fern area design survey, and Acacia Park topographic survey. Mr. Rios serves as the Project Manager and his responsibilities include coordinating all personnel and equipment requirements; performing QA/QC, project cost control, scheduling, and resource allocation; providing final approval of all deliverables; and preparing client reports and invoices.

City of Huntington Beach, On-call Surveying Services, Huntington Beach, CA: Mr. Rios served as Survey Project Manager, responsible for the preparation of corner records. The City of Huntington Beach selected Towill to perform monument preservation and perpetuation services, which required the preservation of all existing monuments found within the areas of construction. Tasks included the verification of existing monuments and their accessories; setting accessory monuments when necessary; filing pre-construction Corner Records with the County of Orange; resetting monuments damaged due to construction; setting of monuments at the surface for buried, non-disturbed monuments; and filing post-construction Corner Records for all 191 monumented positions affected by the street repairs.

City of Irvine, On-call Surveying Services, Irvine, CA: Mr. Rios served as a Survey Project Manager for this contract. Towill provided construction surveying services to support the Culver Drive/University Drive Intersection Improvements Project. Towill’s tasks included performing a centerline survey and monumentation recovery; detailed topographic surveys of the streets, sidewalks, and neighboring properties; developing a digital terrain model sufficient in detail to support 1.0’ contour generation; street cross-sections at 50.0’ intervals; construction staking; as-built surveys; and centerline monument preservation.

City of Rancho Cucamonga, On-Call Design and Construction Surveying Services, Rancho Cucamonga, CA:

Mr. Rios is serving as a Project Manager under an on-call contract with the City of Rancho Cucamonga. Towill is responsible for the coordination and management of the required survey services with the project construction crew and City personnel. Design survey deliverables include signed and dated original survey notes, point data in ASCII file format, and base map data in AutoCAD format. Additionally, Towill is establishing horizontal and vertical control, preparing and filing corner records with San Bernardino County, and providing staking, field survey cross-sections, pre- and post-construction monument preservation.

Years of Experience
Total: 27
With Towill: 6

Education
A.A., Surveying/Mapping
Sciences, Santiago
Canyon College,
Orange, CA

Professional
Registration
Professional Land
Surveyor, CA #8823

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

MARVIN MILLER, MBA, CP, PPS, RPP | PROJECT PRINCIPAL
Marvin Miller is an accomplished geomatics professional with 47 years of project/operations management, project design/implementation, and leadership/consulting experience within the disciplines of surveying, remote sensing, photogrammetry, enterprise GIS, and related geomatics services. His experience includes the organization, management, and oversight of hundreds of major surveying and mapping projects. During his career, Mr. Miller has served as the principal in charge, project manager, technical compliance manager, and surveyor of record for numerous federal, state, and local agency project undertakings. He will be responsible for ensuring the allocation of corporate resources, performing independent technical reviews, QA/QC oversight, and crew safety procedures/protocols. He serves as the Principal in Charge for the following on-call contracts.

City of Fullerton, On-call Professional Surveying Services, Fullerton, CA: Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services. Task orders to date include Maple Avenue street reconstruction, Rosecrans Avenue pavement rehabilitation and monument restoration, Barris-Fern area design survey, and Acacia Park topographic survey.

City of Rancho Cucamonga, On-Call Design and Construction Surveying Services, Rancho Cucamonga, CA: Under our on-call contract with the City of Rancho Cucamonga. Towill is responsible for the coordination and management of the required survey services with the project construction crew and City personnel. Design survey deliverables include signed and dated original survey notes, point data in ASCII file format, and base map data in AutoCAD format. Additionally, Towill also provides project control surveys, prepares/files corner records with San Bernardino County, performs construction staking, and pre/post-construction monument preservation.

City of Irvine, On-call Surveying Services, Irvine, CA: Towill provided construction surveying services to support the Culver Drive/University Drive Intersection Improvements Project. Towill’s tasks included performing a centerline survey and monumentation recovery; detailed topographic surveys of the streets, sidewalks, and neighboring properties; developing a digital terrain model; street cross-sections at 50.0' intervals; construction staking; as-built surveys; and centerline/property corner monument preservation.

City of Huntington Beach On-call Surveying Services, Huntington Beach, CA: The City of Huntington Beach selected Towill to perform monument preservation and perpetuation services, which required the preservation of all existing monuments found within the areas of construction. Tasks included the verification of existing monuments and their accessories; setting accessory monuments when necessary; filing pre-construction Corner Records with the County of Orange; resetting monuments damaged due to construction; setting of monuments at the surface for buried, non-disturbed monuments; and filing post- construction Corner Records for all 191 monumented positions affected by the street repairs.

Years of Experience
Total: 47
With Towill: 5

Education
MBA, Central Michigan
University, Mt. Pleasant,
MI
B.A., Geology, University
of Central Missouri,
Warrensburg, MO
B.S., Geography,
University of Central
Missouri, Warrensburg,
MO

Professional
Registration
ASPRS Certified
Photogrammetrist
#R1025
Registered Professional
Photogrammetrist, OR
#80664
Photogrammetric
Surveyor, SC #24988
Surveyor
Photogrammetrist, VA
#0408000161

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

JAKE KRUGER, PLS | QUALITY ASSURANCE MANAGER
Jake Kruger has 30 years of experience, including 16 years as a supervisor and project manager. He coordinates and manages extensive overhead transmission and distribution LiDAR and photogrammetric base mapping; design surveys; ground control planning, analysis, and adjustment; boundary measurements, resolution, and monumentation; substation scanning and construction projects; and PLS-CADD deliverables. In coordination with the Project Manager, he will be responsible for assuring the independent review of the technical accuracy and completeness of all project deliverables.

City of San Diego As-Needed Land Surveying Services, City of San Diego, CA:

Mr. Kruger currently serves as the Project Manager for this dynamic as-needed contract with the City of San Diego. His role includes preparing detailed scope, cost, and schedule proposals for each task order, planning and coordinating surveying and mapping services with City and subconsultant partners, coordinating personnel and equipment; QA/QC; cost control, scheduling, and resource allocation; reviewing all deliverables for quality control; final approval of all deliverables; client reports and invoices; and coordinating with City, State, and other affected agencies. Towill has been awarded 48 task orders to date comprising a broad spectrum of services including construction support for transportation and park improvements; monument location, preservation, and repair; and street and utility rehabilitation right-of-way engineering projects.

Southern California Edison (SCE), On-call Land Surveying Master Services Agreement, Southern CA: Towill is providing field and office surveys for this three-year, on-call survey contract with Southern California Edison.

One task order for Union Pacific Railroad (UPRR) license surveys involved the conversion of UPRR license agreements to easement documents for Southern California Edison at various locations within Inyo, Kern, Kings, Los Angeles, Orange, Riverside, San Bernardino, Santa Barbara, and Tulare Counties. Another task was to conduct office surveys for the right-of-way acquisition of 58 parcels along the four-mile Chino Hills Underground project. Mr. Kruger serves as Project Manager and is responsible for QA/QC and final review of project deliverables.

San Diego Gas & Electric Company (SDG&E), ESH Land Surveying Services, San Diego, Imperial, and Orange Counties, CA: Towill has been directly supporting SDG&E’s fire hardening program since 2009 through various on-call contracts and subcontract agreements through approved engineering vendors. This most recent agreement awarded in March 2021 supports the Electric System Hardening program that oversees multiple projects. The program incorporated a broad spectrum of geomatics services in support of pre-design mapping of distribution power poles across the expansive service territory, cadastral base mapping, 30% design engineering field support, construction support, and as-built mapping of constructed circuits. These time-sensitive projects cover hundreds of square miles of existing utility infrastructure and require close coordination with SDG&E Aviation Services, Project Managers, consultant partners, and SDG&E customers. Mr. Kruger is the Project Manager, responsible for all office and field activities, QA/QC review, and deliverables.

Years of Experience
Total: 30
With Towill: 14

Education
Undergraduate studies
with an emphasis on
land surveying,
mathematics, and
natural sciences,
University of North
Dakota, Grand Forks

Professional
Registration
Professional Land
Surveyor, CA #8462
Professional Land
Surveyor, NV #19938

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

CHAD ANGRISANI, SA | SAFETY COORDINATOR
As Corporate Safety Coordinator, Chad Angrisani is a key member of Towill’s Safety Leadership Team. His primary daily responsibilities include management of the company’s ISNetworld account and a suite of proprietary internal mobile applications for safety inspection data collection and tracking, which maintains Towill’s “Grade A Rating” in this global safety management database.

Additionally, he provides employee training; maintenance and distribution of employee safety supplies and PPE; production of companywide HSE-related communications and messaging; and Air Quality Index (AQI) and Fire Potential Index (FPI) monitoring throughout Towill’s service area. Mr. Angrisani also produces client-specific safety, compliance, and prequalification documents on a per-project basis; assists Towill’s project managers with the development of project and/or site-specific safety plans as needed; and facilitates or performs office and vehicle safety inspections quarterly.

Pacific Gas & Electric Co. (PG&E), Multiple Master Services Agreements, Northern CA: Mr. Angrisani leads weekly tailgate safety meetings and participates in field staff meetings and interoffice coordination calls. He also interacts directly with client safety personnel and represents Towill at regular client safety meetings, such as PG&E’s monthly Land and Environmental Management Contractor Safety and weekly Gas Construction Safety & Operations meetings.

California High-Speed Rail Authority (CHSRA), High-Speed Rail (HSR) Project Right of Way Engineering and Survey Services, Multiple Locations, CA: Towill is providing a wide range of services in support of California’s HSR Project, including the preparation of boundary, monumentation, survey control, and appraisal maps; Records of Survey, Preliminary Title Reports, Legal Descriptions and Plats, and Certificates of Compliance; and various related right of way engineering services in the office and field. As a Project Coordinator, Mr.

Angrisani has designed and developed multiple interactive PDF forms in Adobe Acrobat DC for use by Towill’s office survey technicians. He has adapted CHSRA’s static PG&E/HSR Checklist for Conveyances into a fillable PDF form; designed and developed an interactive quality control checklist for HSR legal descriptions and plats through multiple iterations; and designed an interactive legal description title page form to standardize parcel data entry between survey technicians and project coordinators working in multiple locations. Mr. Angrisani used JavaScript for Acrobat extensively in the quality control checklist and title page form to improve interactive functionality, ensure data input consistency, and reduce the potential for typographical errors (e.g., conditional field visibility, conditional menu options generated dynamically via custom validation scripts, form print and reset, etc.).

Northern California Power Agency, Geothermal Substation Survey, Lake County, CA: As a subconsultant to the project owner’s engineer, Towill performed conventional total station surveys and terrestrial laser scanning to produce design-level topographic mapping of an electrical substation and adjacent lattice tower.

As a Project Analyst, Mr. Angrisani participated in the pre-job safety briefing and was responsible for collecting and processing high-resolution photography of the lattice tower, substation equipment, and site perimeter.

Years of Experience
Total: 29
With Towill: 9

Education
A.A., Art Digital Media,
Diablo Valley College,
Pleasant Hill, CA

Professional
Certification
Safety Associate,
Construction Industry;
OSHA Training Institute
Education Centers,
Chabot-Las Positas
Community College
District, Pleasanton,
CA
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

CHRIS JOHNSON, LSIT | OFFICE SURVEY LEAD
Chris Johnson brings over 37 years of professional experience and is an Office Surveyor/Certified Party Chief with Towill. His background includes design surveys, construction staking, corridor control surveys, boundary surveys, ALTA surveys, HDS surveys, right-of-way monumentation, and topographic surveys.

Mr. Johnson has also performed GPS data reduction, least squares adjustments, final mapping, and CAD drafting tasks for topographic and boundary surveys. He will be responsible for processing field data, performing GPS reductions and network adjustments, and preparing internal data deliverables for various other project team leaders.

Orange County Transportation Authority, SR-91 Westbound Widening, Anaheim, CA: Towill provided all construction surveying services, including monument preservation and perpetuation, construction staking, horizontal and vertical control, as-built surveys, and right of way surveys. The project began with the need to as-built four bridges requiring widening. It was determined that during the design phase, not enough information was collected to design the widening and fit existing improvements and conditions. These as-built surveys performed were critical in developing revised design plans and four scale drawings for construction. Mr. Johnson was responsible for control research, field data reductions, and adjustments.

City of Fullerton, On-call Professional Surveying Services, Fullerton, CA: Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services. Task orders to date include Maple Avenue street reconstruction, Rosecrans Avenue pavement rehabilitation and monument restoration, Barris-Fern area design survey, and Acacia Park topographic survey. Mr. Johnson is the Office Survey Lead for this contract. His responsibilities include processing field data, performing GPS reductions and network adjustments, reducing laser scanning datasets, analyzing laser scan data, and preparing internal deliverables for final deliverables.

City of Irvine, On-call Surveying Services, Irvine, CA: Towill provided construction surveying services to support the Culver Drive/University Drive Intersection Improvements Project. Towill’s tasks included performing a centerline survey and monumentation recovery; detailed topographic surveys of the streets, sidewalks, and neighboring properties; developing a digital terrain model sufficient in detail to support 1.0’ contour generation; street cross-sections at 50.0’ intervals; construction staking; as-built surveys; and centerline/property corner monument preservation. As Office Surveyor, Mr. Johnson’s duties include research of horizontal and vertical controls and the processing of collected laser scan data.

Los Angeles County Department of Public Works (LACDPW), As-Needed Surveying and Mapping Services, Malibu, CA: Mr. Johnson serves as Office Surveyor. One of the task orders for this contract included aerial photogrammetric mapping and supplemental topographic surveys for more than 30 miles of roadway within the City of Malibu. Los Angeles County provided the survey team with primary horizontal and vertical controls and the limits of each street that needed to be mapped. For the Martin Luther King Hospital Parking Garage Improvement Project task order, Towill provided horizontal and vertical control, detailed topographic and utility surveys, ground penetrating radar and utility pothole investigation, boundary surveys, and the preparation of exhibit maps. Mr. Johnson is responsible for control research, field data reductions, and adjustments.

Years of Experience
Total: 37
With Towill: 11

Education
Undergraduate Studies,
University of Southern
California, Los
Angeles, CA

Professional
Registration
Land Surveyor-in-
Training, CA #5129

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

DANIEL ORTEGA, PLS | PROJECT SURVEYOR
Daniel Ortega is a Professional Land Surveyor with over 11 years of experience in the industry. He is responsible for performing a variety of office surveying services, including the preparation of data for the field crews’ survey calculations, field note reductions, and survey engineering drafting, as well as topographic mapping, oversight of CADD technicians, and QC of deliverables.

Daniel will be responsible for coordinating internal field and office surveyor data input/finishing and overseeing the accuracy and completeness of these internal data sets.

City of Fullerton, On-call Professional Surveying Services, Fullerton, CA: Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services. Task orders to date include Maple Avenue street reconstruction, Rosecrans Avenue pavement rehabilitation and monument restoration, Barris-Fern area design survey, and Acacia Park topographic survey. Mr. Ortega is a Project Surveyor for this contract. As Project Surveyor, Mr. Ortega is responsible for coordinating between field and office surveyors and managing the production of deliverables.

City of Rancho Cucamonga, On-call Design and Construction Surveying Services, Rancho Cucamonga, CA:

Design surveying services include research and verifications of monuments, preparation/filing of corner records, setting monuments, providing horizontal and vertical control surveys, performing topographic surveys, providing cross-sections, locating and mapping utilities and other site features, providing traffic control during field surveys, and submitting final deliverables to the City within 15 days of completing the survey. Construction surveying services include reviewing project plans and special provisions, attending pre- construction meetings, tie-out of monuments, resetting and/or setting monuments, staking, and providing traffic control while performing field survey tasks. For the Center Avenue Pavement Rehab Project task, he was responsible for oversight of the CADD technicians and QA/QC of the project deliverables.

Orange County Transportation Authority (OCTA), OC Streetcar Construction Management Services Project, Orange County, CA: As a member of the construction management team, Towill is performing a wide range of construction survey support services for the OCTA Streetcar project. This project is in coordination with the Cities of Santa Ana and Garden Grove to construct a new east-west double-track modern streetcar in Orange County between the Santa Ana Regional Transportation Center in the City of Santa Ana and the Harbor Boulevard/Westminster Avenue intersection in the City of Garden Grove. Mr. Ortega is an Office Surveyor, responsible for processing the data collected from our GEDO system (GEDO Rec software) to develop railroad analysis that compares rail design and existing conditions by using 3D coordinates, together with gauge and cant information from the alignment design file.

County of Los Angeles, Department of Public Works, East LA Stormwater Capture, Los Angeles, CA: For a task under our As-needed Surveying and Mapping Services contract, Towill provided horizontal and vertical control surveys and construction survey support services for the proposed East Los Angeles Sustainable Median Stormwater Capture Project in the unincorporated area of East Los Angeles. Mr. Ortega was an Office Surveyor, responsible for the geodetic control for a new path/sustainable median project. He also created the construction staking plan for the field crew, including offset points, center of the header, the edge of path, new and existing trees, and tree driplines.

Years of Experience
Total: 11
With Towill: 8

Education
B.S., Geomatics
Engineering, California
State University,
Fresno

Professional
Registration
Professional Land
Surveyor, CA #9569

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

LORRAINE AMENDA, PLS, CP | AERIAL SURVEY LEAD
Lorraine Amenda has 33 years of surveying and mapping experience and has served as a Senior Photogrammetrist and Photogrammetry Project Manager for over 20 years. Ms. Amenda is responsible for the design, implementation, and supervision of photogrammetric, airborne LiDAR, and GIS tasks following contractual requirements and applicable professional standards. She tracks progress and prepares reports for the project principal, performs advanced technical functions such as analytical aerotriangulation computations, prepares metadata, and technical reports, and implements QA/QC processes to verify that the project deliverables adhere to the clients’ CAD specifications.

City of Anaheim Public Works Department, Gene Autry Way Improvements, Anaheim, CA: This project widened Gene Autry Way from four to six lanes, improving the arterial service level. Towill’s services included horizontal and vertical controls, aerial photogrammetric mapping, topographic design surveys, centerline surveys, right of way acquisition support, legal descriptions and plats, and specific details on various utility features within the project limits.

Ms. Amenda served as the Lead Photogrammetrist.

Caltrans District 59, Asset Management Photogrammetry, Newport Beach and Anaheim, CA: Towill’s contract with Caltrans District 59 was to provide as- needed professional and technical photogrammetry and incidental surveying services throughout California.

We performed aerial photogrammetric mapping within Caltrans District 12 for approximately fifteen (15) miles of State Route 55 between Newport Beach and Anaheim in Orange County. We also developed and submitted a detailed Quality Control Report as a deliverable to document key metadata, technical and QA/QC processes, and results. Ms. Amenda was the Contract Manager for this project.

City of Fullerton, On-call Professional Surveying Services, Fullerton, CA: Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services. Task orders to date include Maple Avenue street reconstruction, Rosecrans Avenue pavement rehabilitation and monument restoration, Barris-Fern area design survey, and Acacia Park topographic survey. Ms. Amenda is the Aerial Mapping Lead.

Los Angeles County Department of Public Works, As-needed Aerial Photography and Digital Topographic Mapping, Los Angeles County, CA: Ms. Amenda is the Senior Photogrammetrist for Towill’s on-call professional services contract. With each task order, county staff provides Towill with the mapping limits and other project specifications such as map scale, contour interval, and orthophoto resolution. Towill develops a photo control survey plan and submits the plan back to county staff that performs the field survey work.

Twelve task orders have been completed to date that have involved mapping for various types of terrain, including desert, rugged mountains, and coastal plains, as well as extensive urban development areas.

Southern California Edison (SCE), On-call Land Surveying Master Services Agreement, Southern CA:

Ms. Amenda serves as Senior Photogrammetrist for this contract. Towill is providing field and office surveys for this on-call survey contract with SCE. One task order for Union Pacific Railroad (UPRR) license surveys involved the conversion of UPRR license agreements to easement documents for Southern California Edison at various locations throughout Southern and Central California. Another task was to conduct office surveys for the right-of-way acquisition of 58 parcels along the four-mile Chino Hills Underground project.

Years of Experience
Total: 33
With Towill: 33

Education
B.S., Surveying
Engineering, California
State University,
Fresno

Professional
Registration
Professional Land
Surveyor, CA #7217

ASPRS Certified
Photogrammetrist
#1517
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

SARA REED, CP, LSIT | AIRBORNE LiDAR SPECIALIST
Sara Reed’s diverse and applicable experience includes several key aerial photogrammetric mapping tasks, such as evaluation and processing of digital aerial photography, analytical aerotriangulation mensuration, and computations (including the processing of airborne GPS and IMU control data) using a variety of software packages, digital map editing (CADD), and development of digital orthophotography. She also has more than ten years of experience planning flight missions to acquire aerial LiDAR data, serving as a LiDAR system operator in the aircraft to acquire aerial LiDAR data, processing the LiDAR data to develop accurately georeferenced point clouds, and classification of the LiDAR data to develop various types of geospatial deliverables. She is skilled at integrating multiple sources of geospatial data to develop comprehensive, accurate surveying and mapping deliverables.

City of Anaheim Public Works Department, Gene Autry Way Improvements, Anaheim, CA: This project widened Gene Autry Way from four to six lanes, improving the arterial service level. Towill’s services included horizontal and vertical controls, aerial photogrammetric mapping, topographic design surveys, centerline surveys, right of way acquisition support, legal descriptions and plats, and specific details on various utility features within the project limits.

Ms. Reed served as a Photogrammetrist.

Caltrans District 59, Asset Management Photogrammetry, Newport Beach and Anaheim, CA: Towill’s contract with Caltrans District 59 was to provide as-needed professional and technical photogrammetry and incidental surveying services throughout California. We performed aerial photogrammetric mapping within Caltrans District 12 for approximately fifteen (15) miles of State Route 55 between Newport Beach and Anaheim in Orange County. We also developed and submitted a detailed Quality Control Report as a deliverable to document key metadata, technical and QA/QC processes, and results. Ms. Reed served as a Photogrammetrist for this project.

California Department of Water Resources (DWR), As-needed Land Surveying, Aerial Mapping, Remote Sensing, and GIS Services, Statewide, CA: Under a multi-year on-call contract for surveying and mapping projects throughout California, Towill is providing a wide range of services, including geodetic control surveying, topographic surveying, bathymetric/hydrographic surveying, construction surveying, aerial photogrammetric surveying and mapping, and terrestrial and airborne LiDAR surveying and mapping. Towill's comprehensive geomatics services are supporting emergency response applications, design and maintenance of the State Water Project, design and construction of dams and levees, earthwork quantity determinations, and numerous other projects statewide. Ms. Reed serves as a LiDAR Geomatics Analyst for this contract.

City of Santa Monica, California Incline Bridge Replacement Project, Santa Monica, CA: The City of Santa Monica, in cooperation with Caltrans, is reconstructing the California Incline Bridge to meet current seismic standards. The incline extends approximately 1,400 feet from the intersection of Ocean and California Avenues at the top of the Palisades bluffs to the Pacific Coast Highway (SR-1) at the base of the bluffs. The project includes the demolition of the existing bridge and the construction of a new bridge at the same location. Towill provided horizontal and vertical control, detailed topographic surveys, land net surveys and mapping, and utility surveys and mapping. Ms. Reed served as a Photogrammetrist.

Years of Experience
Total: 15
With Towill: 13

Education
M.S., Engineering,
Geomatics Area, Purdue
University, 2008
B.S., Geomatics
Engineering, California
State University, Fresno,
2006

Professional
Registration
2018/Certified
Photogrammetrist
#1634/ASPRS
2007/Land Surveyor in
Training #7259/CA
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

NICK LEWIS, PLS | FIELD SURVEY LEAD
Nick Lewis holds a California Professional Land Surveyor license and is a Certified Party Chief with the International Union of Operating Engineers Local 12 with 41 years of field and office surveying experience. He obtained a degree in construction, which included coursework in surveying, technology, planning, site studies, contract law, and construction economics. His land surveying experience includes design and construction surveys for roadways, water infrastructure, airports, and many other types of infrastructure; geodetic control surveys; topographic surveys; boundary surveys; monitoring surveys; and Static Terrestrial Laser Scanning (STLS). His practical field survey experience includes interchanges, light rail, dams, tunnels, freeway, and bridge projects. He is knowledgeable in the use of Trimble and Leica total stations and GPS technologies, MicroStation and InRoads, and Trimble Business Center.

City of Anaheim Public Works Department, Gene Autry Way Improvements, Anaheim, CA: This project widened Gene Autry Way from four to six lanes, improving the arterial service level. Towill’s services included horizontal and vertical controls, aerial photogrammetric mapping, topographic design surveys, centerline surveys, right of way acquisition support, legal descriptions and plats, and specific details on various utility features within the project limits. Mr. Lewis served as a Party Chief for this project.

Orange County Transportation Authority, SR-91 Westbound Widening, Anaheim, CA: Towill provided all construction surveying services, including monument preservation and perpetuation, construction staking, horizontal and vertical control, as-built surveys, and right of way surveys. The project began with the need to as-built four bridges requiring widening. It was determined that during the design phase, not enough information was collected to design the widening and fit existing improvements and conditions. These as- built surveys performed were critical in developing revised design plans and four scale drawings for construction. Mr. Lewis was Field Survey Lead for this project.

City of Fullerton, On-call Professional Surveying Services, Fullerton, CA: Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services. Task orders to date include Maple Avenue street reconstruction, Rosecrans Avenue pavement rehabilitation and monument restoration, Barris-Fern area design survey, and Acacia Park topographic survey. Mr. Lewis is the Field Survey Lead and is responsible for data collection in the field and coordinating field surveying activities.

City of Irvine, On-call Surveying Services, Irvine, CA: Mr. Lewis served as a Party Chief for this contract. Towill provided construction surveying services to support the Culver Drive/University Drive Intersection Improvements Project. Towill’s tasks included performing a centerline survey and monumentation recovery; detailed topographic surveys of the streets, sidewalks, and neighboring properties; developing a digital terrain model sufficient in detail to support 1.0’ contour generation; street cross-sections at 50’ intervals; construction staking; as-built surveys; and centerline/property corner monument preservation. Final survey documents were delivered in AutoCAD format.

Years of Experience
Total: 41
With Towill: 11

Education
Higher National Degree,
Construction, Croydon
College of Technology,
London, England

Professional
Registration
Professional Land
Surveyor, CA #8105
Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

OLIVER ROCHA, LSIT | CERTIFIED PARTY CHIEF
Oliver Rocha is a Certified Party Chief with Towill and has 33 years of experience in the field of land surveying. He has been involved in numerous survey projects consisting of construction, ALTA surveys, route surveys, topographic, boundary, and GPS surveying on a variety of projects including highways, roadways, site development, and communications. Mr. Rocha is very familiar with Caltrans standards.

Orange County Transportation Authority, SR-91 Westbound Widening, Anaheim, CA: Towill provided all construction surveying services, including monument preservation and perpetuation, construction staking, horizontal and vertical control, as-built surveys, and right of way surveys. The project began with the need to as-built four bridges requiring widening. It was determined that during the design phase, not enough information was collected to design the widening and fit existing improvements and conditions. These as-built surveys performed were critical in developing revised design plans and four scale drawings for construction. Mr. Rocha was responsible for Chief of Party duties.

City of Fullerton, On-call Professional Surveying Services, Fullerton, CA: Towill was selected for a multi-year contract to provide on-call surveying services to the City of Fullerton. Scope of services includes but is not limited to, design topographic surveys, aerial topographic surveys, boundary surveys and analysis, legal descriptions, pre- and post-construction corner records, Records of Survey, construction staking, and plan check services. Task orders to date include Maple Avenue street reconstruction, Rosecrans Avenue pavement rehabilitation and monument restoration, Barris-Fern area design survey, and Acacia Park topographic survey. Mr. Rocha is a Certified Party Chief and is responsible for field surveying tasks.

City of Irvine, On-call Surveying Services, Irvine, CA: As Party Chief, Mr. Rocha’s duties include establishing horizontal and vertical control, monument preservation and perpetuation, topographic surveys, and construction staking. Towill has provided control surveys, topographic surveys, monument preservation and construction surveys under several task orders for the Alton Parkway Rehabilitation Project and the Irvine Center Drive Improvement Project.

City of Rancho Cucamonga, On-Call Design and Construction Surveying Services, Rancho Cucamonga, CA:

Mr. Rocha serves as a Certified Party Chief under an on-call contract with the City of Rancho Cucamonga.

Towill is responsible for the coordination and management of the required survey services with the project construction crew and City personnel. Design survey deliverables include signed and dated original survey notes, point data in ASCII file format, and base map data in AutoCAD format. Additionally, Towill is establishing horizontal and vertical control, preparing and filing corner records with San Bernardino County, and providing staking, field survey cross-sections, and pre-/post-construction monument preservation.

County of Los Angeles, Department of Public Works, As-Needed Surveying and Mapping Services, Los Angeles County, CA: Under Towill’s as-needed contract with the Los Angeles County Department of Public Works, one of Towill’s task orders was to provide ALTA surveys for Fire Station 104. Mr. Rocha served as Party Chief on this project. He was responsible for performing field surveys for horizontal and vertical control, boundary surveys, topographic surveys, and utility surveys.

Years of Experience
Total: 33
With Towill: 11

Education
General Studies, Crafton
Hills College, Yucaipa,
CA

Professional
Registration
Land Surveyor-in-
Training, CA #5033

Proposal to Provide On-Call Survey Support Service for
All Sub-Disciplines for Professional Land Surveying and Aerial Mapping Services to City of Anaheim Public Works Department Construction Services Division

KYLE WALTON | SUE SURVEY LEAD (AirX)

Kyle Walton is the Potholing Project Manager for AirX Utility Surveyors, Inc.’s Inland Empire division. With prior experience as a construction foreman, Mr. Walton is well suited for the unique demands required of an AirX Project Manager. Mr. Walton calls in USA tickets and lays out pothole locations, reducing the changes for “dry” holes and oftentimes reducing project costs by removing unnecessary potholes. He supervises and coordinates scheduling for multiple crews to ensure timely completion of projects. He also coordinates pre-construction meetings with inspectors and scheduling of utility standbys.

Orange County Public Works, Modjeska Grade Rd. Storm Drain Design Project, Silverado, CA: Orange County Public Works requested that AirX Utility Surveyors, Inc. provide Utility Locating/GPR, CAD Mapping, Potholing & Asphalt Hot Patching services. The purpose of this project was to support the design for Modjeska Grade Rd. Storm Drain Design. Mr. Walton provided Project Management for this 18-day, 36 pothole & hot patching project.

Orange County Public Works, Oso Parkway & Coto De Caza Dr. Traffic Signal Design, Coto De Caza, CA:

Orange County Public Works requested that AirX Utility Surveyors, Inc. provide Utility Locating/GPR, CAD Mapping, Potholing & Concrete Patching services. The purpose of this project was to support the design of new traffic signals. Mr. Walton provided Project Management for this 5-day, 9 trench & concrete patching project.

Orange County Public Works, Sump Pump Discharge Pipe Replacement Project, Seal Beach, CA: Orange County Public Works requested that AirX Utility Surveyors, Inc. provide Utility Locating/GPR & Potholing services. The purpose of this project was to locate the existing Navy water line. Mr. Walton provided Project Management for this 1-day, 4 pothole project.

SCG AltAir – Long Beach, Lakewood, Bellflower & Paramount, CA: The purpose of this project was to design a new High-Pressure Gas Transmission Line for So Cal Gas. This is a high-priority line that will service the new AltAir Transmission Plant in the City of Paramount. AirX Utility Surveyors, Inc. provided Utility Locating/GPR, Mapping & Potholing services. Mr. Walton provided project management for this 65-day, 182- pothole project.

Water Main Replacement Project, UT1060, Ontario, CA: AirX Utility Surveyors, Inc. provided Utility Locating/GPR, Potholing & Asphalt Hot Patching services. The purpose of this project was to support the design of 16 separate waterline replacements within the City of Ontario. Mr. Walton provided project management over this 65 Pothole project.

SCE RTRP Transmission Line Routes | Riverside, CA: AirX Utility Surveyors, Inc. provided potholing services in support of GSI Surveyors' design survey for a proposed 10-mile alignment for Southern California Edison.

SCE had a mix of overhead, underground, and mixed alignments. Mr. Walton provided project management for this 19-day, 58-pothole project.

Years of Experience
Total: 15
With AirX: 5

Education
Cal State San
Bernardino
2006-2009
Bachelor of Science,
Kinesiology

Saddleback College
2003-2005
Associate of Arts

Professional
Certifications
• OSHA 10-Hour
• OSHA 30-Hour
• Construction Safety
Course

Appendix B
Signed Addendum

City of Anaheim

DEPARTMENT OF PUBLIC WORKS
ADDENDUM NO. 1

NOTICE TO ALL PROSPECTIVE CONSULTANTS
for the

REQUEST FOR PROPOSALS (RFP) FOR ON-CALL- SURVEY SUPPORT SERVICES July 28, 2023
I. GENERAL
The following changes, additions, or deletions shall be made as indicated, and all other conditions shall remain the same.

II. REVISIONS TO THE REQUEST FOR PROPOSALS (RFP)

1. Request for Prop
osals (RFP)
A. ADD the Standard Insurance Language and Indemnificati on Provisions as
Exhibit C and the sample Consultant Agree ment as Exhibit B to the RFP Reference Documents.

THE DUE DAT

E FOR RESPONSES TO THE REQUEST FOR PROPOSALS
IS 5:00 P.M., AUGUST 24, 2023
All other aspects of the docume
nts pertaining to the Request for Proposals remain in effect and applicable.

The Consultant shall acknowledge receipt of all addenda by signing and enclosing each addendum form in its RFP submittal. Failure to do so may result in a rejection of his/her submittal.

Signature Print Name
Firm Name Date
Marvin Miller
Towill, Inc. August 24, 2023

Addendum No. 2, August 2, 2023 RFQ Design-Build Master Agreement

Page 2 of 2 ends

Q6 In the Cover Letter, it states that proposals should only be submitted in an electronic PDF copy to Planet Bids. However, throughout the RFP it states that a printed Original and 3 bound copies shall be submitted to the City, plus an electronic submission via PlanetBids. Does the City require us to submit printed hard copies? A6 Yes, City requires printed hard copies. Please provide a printed original and three (3) bound copies of the Request for Proposal (RFP) they can be dropped off in person or mailed. In addition to the hard copies please upload via PlanetBids no later than August 24, 2023, at 5:00 PM.

Q7 Will Exhibits A and B (Sample Agreement and Insurance Requirements) be made available?
A7 Exhibits A and B (Sample Agreement and Insurance Requirements) have been made available via Addendum #1 posted on July 28th, 2023. Please refer to section II Revisions to the Request for Proposal (RFP).

Q8 Please disregard our question about Exhibits A+B. We have acknowledged Addendum #1, and see that it addresses that question.

A8 Exhibits A and B (Sample Agreement and Insurance Requirements) have been made available via Addendum #1 posted on July 28th, 2023. Please refer to section II Revisions to the Request for Proposal (RFP).

All other aspects of the documents pertaining to the Request for Proposals remain in effect and applicable.

The Consultant shall acknowledge receipt of all addenda by signing and enclosing each addendum form in its RFP submittal. Failure to do so may result in a rejection of his/her submittal.

Signature Print Name
Firm Name Date
Marvin Miller
August 24, 2023Towill, Inc.

Addendum No. 3, August 14, 2023 Request for Proposals (RFP) For On-Call

Page 2 of 2 ends

All other aspects of the documents pertaining to the Request for Proposals remain in effect and applicable.

The Consultant shall acknowledge receipt of all addenda by signing and enclosing each addendum form in its RFP submittal. Failure to do so may result in a rejection of his/her submittal.

Signature Print Name
Firm Name Date
Marvin Miller
August 24, 2023Towill, Inc.

r �' s12�!��
500 MAIN STREET
SUITE 540
ORANGE, CA 92868
949.261.1900 TEL
WWW.TOWILL.COM

← All documents from this meeting