EXHIBIT A

Project: Installation of Protected/Protected-Permissive Left-Turn Signal Phasing at Three Intersections - Ball Road at Walnut Street, Anaheim Boulevard at Santa Ana Street and La Palma Avenue at Acacia Street/Anna Drive

The work to be done consists of the upgrade of three (3) existing traffic signals for left -turn phasing operation improvements. This shall include installation of traffic signal poles; foundations; signal heads; signal controller and cabinet; conduit; pull boxes; conductors; accessible pedestrian signals; traffic signing; removal and reconstruction of ADA access ramps; concrete sidewalk and all additional work necessary to properly construct the proposed improvements, in accordance with the contract documents. The goal of this project is to provide for the safe and efficient movement of vehicle and pedestrians at the project intersections.

LOWEST AND BEST RESPONSIBLE BIDDER: International Line Builders, Inc., 3955 Temescal Canyon Road
Corona, California 92883

PUBLICATION DATES: 10/12/23, 10/19/23 & 10/26/23

BID OPENING DATE: 11/2/23

PREVAILING WAGE RATES: Per Current D.I.R. Publication

AWARD DATE: 4/16/24

CONTRACT PRICE: One-Million Two Hundred Fifty
Nine Thousand Four Hundred
Sixty Eight Dollars and No
Cents
($1,259,468.00)

CONTRACT COMPLETION DAYS: Sixty (60) Working Days

LIQUIDATED DAMAGES: Three Thousand Six Hundred
Dollars ($3,600) Per Day