Cities Index.
30. Final Subsequent Environmental Impact Report No 352

Anaheim City Council
April 16, 2024

Document
30. Final Subsequent Environmental Impact Report No 352
Meeting
April 16, 2024
Body
Anaheim City Council
Pages
35
Original file
34.8 MB
Text extracted from the city's file for reading and search. Open the original on local.anaheim.net. That file is the official record.

The ARSP area can also be easily accessed by the Orange County Transportation Authority (OCTA) bus lines and Anaheim Resort Transportation Anaheim Transportation Network, both of which provide connections from nearby Metrolink/Amtrak and future high-speed rail stations, including ARTIC (Anaheim Regional Transportation Intermodal Center), a multimodal transportation facility.

DisneylandForward
Final Subsequent EIR No. 352

3-40 Responses to Comments

Page 3 ends

Plan (Section 3, Exhibit 3.3-3)
The title of Exhibit 3.3-3 has been revised as follows: Mobilehome Park (MHP) Overlay in the C-R District

DisneylandForward
Final Subsequent EIR No. 352

3-41 Responses to Comments
DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 4 ends

The number and title of this Exhibit have been revised as follows: Exhibit 4.4-1 Disneyland Drive (North of Ball Road) Cross Section Street Segments Within The Anaheim Resort

DisneylandForward
Final Subsequent EIR No. 352

3-42 Responses to Comments
Disneyland Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan, Page 5- 73 (Section 5, Exhibit 5.8-7 Wall/Fencing Plan)
Exhibit 5.8.7 has been revised to identify “Sound Attenuation Walls” for the Theme Park and Southeast Districts.

DisneylandForward
Final Subsequent EIR No. 352

3-43 Responses to Comments
DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

Various corrections to the Code were made to address section and subsection references, exhibit/table numbers and names, grammatical, punctuation, spelling and typographical errors are not called out separately in this document; any substantive changes are individually addressed.

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

Theme Park (TP) Overlay and Parking (P) Overlay, Building plans for projects developed pursuant to this chapter shall be submitted to the Planning and Building Department and shall be reviewed for conformance wi th all applicable provisions of the Anaheim Resort Specific Plan, this chapter, the Conditions of Approval set forth in Ordinance No. , Mitigation Monitoring Plan No. 387, and terms of any applicable development agreement prior to the issuance of building permits and construction. Building plans within the TP and P Overlays are not subject to the procedures set forth in subsection

18.116.040.020 (Final Site Plan Review and Approval).

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

[…] The Specific Plan also includes a Mobile Home Park (MHP) Overlay, the Anaheim Resort Residential (ARR) Overlay, the Theme Park (TP) Overlay, and the Parking (P) Overlay. These overlays are within the C-R District. The Specific Plan project area legal description is provided in Section 9.0 of the Specific Plan document. The Zoning Map of the City shall reflect the boundaries of the Specific Plan area.

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

“Disney Property.” The real properties in the City DRSP and ARSP owned or leased by Walt Disney Parks and Resorts U.S., Inc. or other subsidiaries of The Walt Disney Company, including those within the Anaheim Resort Specific Plan.

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

“Hotel/Motel Guest Suite.” A hotel/motel guest suite or room that is for rent by a single party with one entry door key for the guest that also controls any doors into or within the guest room or into the service/kitchen area. A hotel/motel guest suite shall be considered one room for the purpose of total room count permitted in the Specific Plan area, even if it includes more than one room.
“Hotel Guest Room or Suite.” A room, rooms or unit in a hotel or vacation ownership resort, intended for occupancy on a commercial basis, containing sleeping and bathing accommodation, with or without kitchen facilities. A hotel guest room or suite shall be considered one room or one unit for the purpose of total room count permitted in the Specific Plan from the point where private keyed entry occurs from a common hall, or vestibule in the case of a shared entry.

DisneylandForward
Final Subsequent EIR No. 352

3-44 Responses to Comments
DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

TABLE 116-A

FINAL SITE PLAN EXEMPTIONS
Exemption Special Provisions
Development in the Theme Park (TP) Overlay and
Parking (P) Overlay
Building plans shall be reviewed for
conformance with all applicable provisions of
the Anaheim Resort and Disneyland Resort
Specific Plans, this chapter, the
DisneylandForward Project Conditions of
Approval set forth in Ordinance No. ,
and Mitigation Monitoring Plan No. 387, and
terms of any applicable development
agreement prior to issuance of building permits
and construction.

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

Development Review and Permits. All building and site plans shall be subject to review by the Zoning Planning Services and Building Divisions of the Planning and Building Department for conformance with the Specific Plan and the approved Final Site Plans, if required.

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

TABLE 116-C

PRIMARY USES AND
STRUCTURES: C-R DISTRICT
(DEVELOPMENT AREA 1)
P Permitted by Right
C Conditional Use Permit
N Prohibited
T Telecommunications Antenna Review Permit
Require
d
Classes of Uses C-R
District
Special Provisions
Vacation ownership
resorts
P/C
Subject to compliance with the requirements of Section

18.116.150 (Requirements for Vacation Ownership
Resorts)
Permitted in the Theme Park and Parking Overlays
and on Disney Property as defined in Section

18.116.030 (Definitions); otherwise a CUP is required

DisneylandForward
Final Subsequent EIR No. 352

3-45 Responses to Comments
DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

Table 116-G
Minimum Setbacks: C-R District
Street Buildings up
to 35 feet in
height
Buildings 35-
75 feet in
height
Buildings
greater than
75 feet in
height
Special Provisions
Disneyland Drive,
between Katella Avenue
and 125 feet north of the
northern right of way of
Katella Avenue
Refer to the Disneyland Resort Specific Plan,
Section 7, See 18.114.060.050.0505.01
Subject to
Disneyland Resort
Specific Plan
Exhibit No.

5.4.1.3a,
Disneyland Drive
Pedestrian Arrival
Gateway South
Landscape
Triangle
Disneyland Drive
between 125 feet north
of the Katella Avenue
northern right of way
and Magic Way
11 feet 11 feet 11 feet
Disneyland Drive
between Magic
WayKatella Avenue
and Ball Road
1911 feet 1911 feet 1911 feet
Disneyland Drive, north
of Ball Roa
d 20 feet 20 feet 20 feet

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

Table 116-H
Permitted Encroachments: C-R District
Encroachments Special Provisions
Bridges and Associated Abutments
and Vertical Circulation Elements
(on Harbor Boulevard, between
Manchester Avenue and Disney
Way)
Bridges on private property that connect two sides of
the public right-of-way are permitted to encroach into
required setbacks. Bridge abutments shall comply with
street setback requirements. Vertical circulation
elements, such as stairways and ramps, may encroach
up to twenty-five percent (25%) of the required setback depth, provided that any railings or support systems are at leastno more than fift
y percent (50%) opaque.

DisneylandForward
Final Subsequent EIR No. 352

3-46 Responses to Comments
DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

TABLE 116-PO-1
PRIMARY USES AND STRUCTURES:

P OVERLAY
P Permitted by Right
C Conditional Use Permit
N Prohibited
T Telecommunications Antenna Review
Permit Required
Classes of Uses TP Overlay Special Provisions
Parking Facilities
P
At the northeast corner of Harbor Boulevard and
Ball Road, non-hotel parking shall be limited to
employee parking

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

P Overlay (northeast corner of Harbor Boulevard and Ball Road) - Up to 5,700 employee parking spaces and up to 534 hotel rooms.

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

[…] Vacation ownership resorts in the Theme Park (TP) Overlay and the Parking (P) Overlay and/or otherwise developed on any Disney property shall comply with Anaheim Municipal Code Section 18.114.120 (Requirements for Vacation Ownership Resorts).

DisneylandForward Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan,

Page 7 ends

Table 116-S
Business Identification Wall Sign –Hotel/Motel
Number of Stories 1-2 3-4 5-9 10-14 Over 15 14
Maximum Sign Area per
Sign Face

160 SF 200 SF 250 SF 300 SF 350 SF
Maximum Letter/Symbol
Height (A)
2 ft. 4 ft. 4 ft. 6 in. 5 ft. 6 in. 10 7 ft.

Maximum Symbol Only
Maximum Height
3 ft. 7 ft. 8 ft. 10 ft. 10 ft.

Disneyland Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan, Page A-3 (Appendix A, Amendment 4 & 5)
Amendment No. 5 expanded The Anaheim Resort boundaries to include approximately 27 26.4 acres located along Harbor Boulevard […]

Disneyland Subsequent EIR Volume 2, Appendix N Anaheim Resort Specific Plan, Page A- 8 (Appendix A, Adjustment 12)
[…] which included amendments to the ARSP regulations to allow prohibit dual-lit signs and allow the encroachment of outdoor dining in required street setbacks.

DisneylandForward
Final Subsequent EIR No. 352

3-47 Responses to Comments
Disneyland Subsequent EIR Volume 2, Appendix Q, Plant List The Public Review Draft included a list of trees, shrubs, vines and ground cover plantings that will provide a larger variety of options that are low water, Southern California natives, and pest resistant. The revised version of the document shown on the following pages provides expanded detail as to the characteristics of the trees and plants and where they may be used, in a format similar to the existing matrices in the DRSP and ARSP.

DisneylandForward
Final Subsequent EIR No. 352

3-48 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-49 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-50 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-51 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-52 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-53 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-54 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-55 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-56 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-57 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

3-58 Responses to Comments

DisneylandForward
Final Subsequent EIR No. 352

R:\Projects\WDI\3WDI000400\Environmental Documentation\Final SEIR\Final_SEIR-022824.docx 4-1 SECTION 4.0 MITIGATION MONITORING PROGRAM
MITIGATION MONITORING PROGRAM (MMP) NO. 000387 (INCLUDING PROJECT DESIGN

FEATURES) FOR THE DISNEYLAND RESORT PROJECT AS AMENDED BY

THE DISNEYLANDFORWARD PROJECT

CEQA Action Subsequent Environmental Impact Report No. 352 (Resolution No. ____) Project Description General Plan Amendment, Specific Plan No. 92-1 Amendment No. 9, and Specific Plan No. 92-2 Amendment No. 17 Applicant Walt Disney Parks and Resorts U.S., Inc., 500 South Buena Vista Street, Burbank, California,

Project Location The Project site is located approximately 35 miles southeast of downtown Los Angeles and seven miles northwest of Santa Ana, in central Orange County, California, and is generally located adjacent to and southwest of the Interstate 5 (I-5), between Ball Road to the north, Walnut Street to the west, and Chapman Avenue to the south. The Project site encompasses The Disneyland Resort, including the Theme Park, Parking and Southeast Districts of the Disneyland Resort Specific Plan (DRSP), and properties in the Anaheim Resort Specific Plan (ARSP) Commercial Recreation (C-R) District (Development Area 1) owned or controlled by Walt Disney Parks and Resorts U.S., Inc. (Disney) or other subsidiaries of The Walt Disney Company.

Terms and Definitions

1. Applicant - Walt Disney Parks and Resorts U.S., Inc.

2. Property Owner/Developer – Any owner or developer of properties owned by Disney or other subsidiaries of The Walt Disney Company within the DRSP or the ARSP.

3. Project Design Features (PDFs) – Measures incorporated into The Disneyland Resort Project as amended by the DisneylandForward Project by the applicant with the intent of minimizing potential environmental impacts. The PDFs included in this Miti gation Monitoring Program will be implemented as mitigation measures.

4. Environmental Equivalent/Timing – To the extent permitted by law, if Disney cannot complete any PDF or Mitigation Measure and timing thereof, the City may specify another substituted measure, which (i) will have the same or superior result, (ii) will have the same or superior effect on the environment, and (iii) has a nexus to the Project. The Planning Department, in conjunct ion with any appropriate agencies or City departments, shall de termine the adequacy of any proposed “environmental equivalent/timing” based on substantial evidence and, if determined necessary, may refer said deter mination to the Planning Commission. Any costs associated with information required to make a determination of environmental equivalency/timing shall be borne by the Applicant.

5. Responsibility for Monitoring – Shall mean that compliance with the subject mitigation measure(s) shall be reviewed and determined adequate by all departments listed for each mitigation measure.

6. Ongoing Mitigation Measures – The mitigation measures that are designated to occur on an ongoing basis as part of this mitigation monitoring program will be monitored in the form of an annual letter from the Property Owner /Developer and/or Applicant in January of each year stating how compliance with the DisneylandForward
Final Subsequent EIR No. 352

R:\Projects\WDI\3WDI000400\Environmental Documentation\Final SEIR\Final_SEIR-022824.docx 4-2 subject measure(s) has been achieved. Mitigation Measures are referenced in parentheses by their section number as identified in the Draft Subsequent EIR No. 352. Mitigation Measures and/or PDFs designated to occur on an ongoing basis are noted with an asterisk (*). For mitigatio n measures/PDFs that are to be monitored “Ongoing During Construction”, the annual letter will review those mitigation measures/PDFs only while construction is occurring; monitoring will be discontinued after construction is complete. A final annual letter will be provided at the close of construction.

7. The City recognizes that the certain infrastructure improvement s and service capabilities, as identified in this Mitigation Mon itoring Program, will serve not only the Applicant but also other property owners/developers in the Specific Plan area, The Anaheim Resort, and the service are a, each of which should contribute in allocable share of the cost of these improvements. To implement this requirement as it applies to other property owners/developers in the Specific Plan area, The Anaheim Resort, and the service area, the City shall make appropriate arrangements with other public agencies, i f any, to reimburse the Applicant to the extent that its contributions for these improvements exceed the Applicant’s allocable share of the cost. Such arrangements shall include one or more of the following: (1) creation of integrated financing districts; (2) entry into a reimbursement agreement with the Applicant; (3) creation of appropriate community facilities districts, assessment districts and/or use of similar public financing districts and/or mechanisms; and (4 ) creation of such other mechanisms or districts as may be appropriate to provide for the reimbursement of thes e costs. The determination of the allocable share of improvement costs attributable to the Applicant and other property owners/developers, and reim bursement amounts, shall be based on an appor tionment of the costs of such improvements and equipment and personnel among property owners/developers, including the Applicant, in the Specific Plan area, The Anaheim Resort, or otherwise defined service area, as applicable, depending on the area served.

8. To the extent that this Mitigation Monitoring Program requires the Applicant to submit plans for several phases simultaneously, it is understood that such later phase plans may be considered preliminary and may be subject to change. Such preliminary plans for the later phase will not be required to provide the level of detail required for the initial phase plans provided that more detailed plans will be submitted separately at a later time. Nevertheless, such preliminary plans for the later phase shall provide sufficient schematic or descriptive detail to ensure that plans submitted for said later phase shall comply with the provisions of this Mitigation Monitoring Program and shall be consistent with the provisions of the initial phase plans.

9. Timing – This is the point where a mitigation measure/PDF must be monitored for compliance. In the case where multiple action items are indicated, it is the first point where compliance associated with the mitigation measure/PDF must be monitored. Once the initial action item has been complied with, no additional monitoring pursuant to the Mitigation Monitoring Program will occur, as routine City practices and procedures will ensure that the intent of the measure design feature has been complied with. For example, if the timing is “to be shown on approved building plans” subsequent to issuance of the building permit consistent with the approved plans will be final building and zoning inspections pursuant to the building permit to ensure compliance.

10. Building Permit – For purposes of this Mitigation Monitoring Program, a buildi ng permit shall be defined as any permit issued for construction of a new building or structural expansion/modification of any existing building, but shall not include any permits required for interior tenant improvements or minor additions of up to 1,000 square feet to an existing structure or building.

← All documents from this meeting