G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-138

3.11.3 Cumulative Population and Housing Impacts
Approved Project
Less Than Cumulatively Considerable Impact. EIR No. 331 analyzed potential cumulative impacts of the Approved Project in the context of growth projections for the City of Anaheim set forth in the adopted General Plan Update in September 2003. According to the certified General Plan Final EIR associated with the General Plan Update, a maximum of 2,500 units and an average household occupancy of 3.3 persons per unit were assumed within the Specific Plan Area. Because the Approved Project did not propose an increase in the allowable residential development within the Specific Plan Area, the Approved Project was found to be consistent with the MPSP’s planned population and housing parameters as set forth in the General Plan Final EIR. In addition, the employment-generating land use parameters of the Approved Project were found to be consistent with the parameters of the General Plan Final EIR. As such, cumulative analysis conclusions from the General Plan Final EIR, which concluded that impacts to population and housing would not be cumulatively considerable, were found to be applicable to the Approved Project. No significant adverse cumulative impacts to employment, housing, or population were identified in EIR No. 331.

Proposed Project
Less Than Cumulatively Considerable Impact. As with the Approved Project, the Proposed Project can be considered in the cumulative context of growth projections for the City of Anaheim.

However, according to the City’s April 2023 Draft General Plan Housing Element Update, the maximum permitted number of units within the Specific Plan Area remains 2,500. However, it should be noted that the city did not consider the 2,500 residential units previously approved within the Specific Plan Area as contributing to the City’s RHNA obligation due to the establishment of the 2014 conservation easement.

The Proposed Project would include the establishment of cemetery uses within DA 5 of the MPSP Area, in which EIR No. 331 analyzed a buildout of 1,595 residential units. Therefore, the Proposed Project does not include any residential uses with the potential to result in cumulatively considerable impacts to population and housing. Further, the Proposed Project would not hinder the City’s achievement of its RHNA allocation, since the 2,500 units within the MPSP were not considered as part of this allocation in the Sixth Cycle Housing Element.

Because the Approved Project was found to have less than cumulatively considerable impacts relating to population and housing and the Proposed Project would not propose any residential units or major employment centers, no significant adverse cumulative impacts to employment, housing, or population would occur under the Proposed Project.

3.11.4 Findings Related to Population and Housing

3.11.4.1 No New Significant Effects Requiring Major Revisions to the Certified EIR Based on the foregoing analysis and information, there is no evidence that the Proposed Project requires a major change to EIR No. 331. The Proposed Project would not result in new significant environmental impacts related to population and housing, and there would not be a substantial increase in the severity of impacts described in EIR No. 331. 3-139
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

3.11.4.2 No Substantial Change in Circumstances Requiring Major Revisions to the Certified EIR No major changes to the Specific Plan Area have taken place since preparation of EIR No. 331 that would require revisions to the analysis in EIR No. 331. There is no information in the record or otherwise available that indicates that there are substantial changes in circumstances pertaining to population and housing that would require major changes to EIR No. 331.

3.11.4.3 No New Information Showing Greater Significant Effects than the Certified EIR This Addendum has analyzed all available relevant information to determine whether there is new information that was not available at the time of EIR No. 331, indicating that a new significant effect not reported in that document may occur. Based on the information and analyses above, there is no substantial new information indicating that there would be a new significant impact related to population and housing requiring major revisions to EIR No. 331.

3.11.4.4 No New Information Showing the Ability to Reduce Significant Effects in the Certified EIR There is no new information, mitigation, or alternatives to the Proposed Project that would substantially reduce one or more significant impacts pertaining to population and housing identified and considered in EIR No. 331.

3.11.5 Standard Conditions and Mitigation Measures
EIR No. 331 found that the Approved Project would not result in significant impacts relating to population and housing and no Standard Conditions or mitigation measures were identified.

Further, as previously discussed, the Proposed Project does not include any residential development that would necessitate the adoption of new mitigation measures pertaining to population and housing.

3.12 PUBLIC SERVICES AND UTILITIES

3.12.1 Existing Environmental Setting
No substantial changes to the Specific Plan Area have occurred since the preparation of EIR No. 331; however, the current information for public services and utilities within Anaheim is provided below.

3.12.1.1 Fire Protection
The Anaheim Fire Department is responsible for fire protection in Anaheim. The Anaheim Fire Department operates 11 fire stations and employs approximately 278 safety and full-time civilian personnel.

3.12.1.2 Police Protection
Law enforcement in Anaheim is provided by the Anaheim Police Department. The Anaheim Police Department currently employs over 400 sworn officers and upwards of 170 civilian support staff.

The nearest police station is the Anaheim Police Department East Station, located at 8201 East Santa Ana Canyon Road, approximately 2.1 miles west of the project site.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-140

3.12.1.3 Public Schools
Overall, the Anaheim City School District, Anaheim Union High School District, Orange Unified School District, Centralia School District, Magnolia School District, Savanna School District, Fullerton School District, Fullerton Joint Union School District, Placentia-Yorba Linda Unified School District, Garden Grove Unified School District, and Buena Park School District provide educational services to the city. The specific project area is within the Orange Unified School District.

3.12.1.4 Public Libraries
The City of Anaheim Library Services Division maintains a Strategic Plan to guide the future development of the City’s libraries, and there are 10 library branches currently serving the city.

3.12.1.5 Water
With the exception of several small areas bordering the city limits, the Anaheim Public Utilities Department provides water service throughout the city. The system includes approximately 760 miles of water mains, 63,000 active water meters, and 7,950 fire hydrants. The system facilities also include eight water connections to the Metropolitan Water District of Southern California, 27 active wells, one 920-million-gallon (MG) reservoir for untreated water, one 20 MG per day water treatment plant, 12 reservoirs with a total capacity of more than 36.5 MG for treated water, seven chlorination facilities, and nine booster pump stations.

3.12.1.6 Wastewater
Sewage is collected by City collector facilities and conveyed to trunk sewers owned and maintained by the Orange County Sanitation District (OCSD). There are small portions of Anaheim that receive local sewer service from adjacent agencies, including the City of Stanton Water District and the City of Garden Grove Sanitary District. Two Orange County wastewater treatment plants serve the Specific Plan Area.

3.12.1.7 Electric Power
The Anaheim Public Utilities Department’s Electrical Division provides electricity to Anaheim’s citizens and business industries. The distribution system consists of approximately 1,500 circuit miles of transmission and distribution lines, over 500 miles of which are underground. In order to facilitate the safe and efficient transfer of electricity to residences and businesses, 12 distribution substations are located throughout Anaheim.

3.12.1.8 Natural Gas
Southern California Gas Company (SoCalGas) provides gas service in Anaheim and has facilities throughout the city. The availability of natural gas service is based on present conditions of gas supply and regulatory policies. As a public utility, SoCalGas is under the jurisdiction of CPUC and federal regulatory agencies.

3.12.1.9 Telecommunication Facilities
Telephone, television, and internet services are offered by a variety of providers in Anaheim, including AT&T, Cox Communications, Earthlink, and Starry Internet. Nonsatellite providers include 3-141
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

Frontier, DirectTV, Spectrum Cable, and DishTV. Satellite internet providers include ViaSat. These services are privately operated and offered to each location in the city for a fee defined by the provider.

3.12.1.10 Landfills
The County of Orange owns and operates three active landfills. These are Olinda Alpha Landfill near Brea, the Frank R. Bowerman Landfill near Irvine, and the Prima Deshecha Landfill in San Juan Capistrano. In order to ensure that the maximum permitted daily tonnage at a particular landfill is not exceeded, refuse trucks may have to transport material to one or the other. In October 2020, the anticipated landfill closure date for the Olinda Alpha Landfill was extended to 2036 due to increased recycling and waste diversion.

3.12.2 Comparison of Impacts for the Approved Project and the Proposed Project Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which would cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for i) fire protection services, ii) police protection services, iii) schools, or iv) library services? Approved Project
Fire Protection
Less Than Significant Impact. Development of the Approved Project included the conversion of undeveloped land in a hillside area to primarily residential land uses. As a result, the Approved Project would result in the increase in the demand for fire protection services provided by the City of Anaheim. As described in EIR No. 331, the Approved Project included the development of a fire station within DA 6 and implementation of additional fire protection features, such as a fuel modification plan, access design for emergency vehicles, and building features. With the provision of a fire station within DA 6, service levels provided by the Anaheim Fire Department to areas within the city would not be impacted, and the response times in the vicinity of the project would be decreased. The fire station site would have been within the Approved Project area and was included in the analysis of potential environmental impacts associated with development of the Approved Project and was addressed in the respective sections of EIR No. 331. In addition, EIR No. 331 prescribed Standard Condition (SC) 12-1 requiring the property owner/developer to demonstrate that each tentative tract or parcel map has been prepared in complain with applicable provisions of the Anaheim Municipal Code and Specific Plan related to fire prevention and suppression, which would be subject to the review and approval of the Fire Department. With implementation of SC 12- 1, EIR No. 331 determined that potential impacts on fire protection services would be less than significant.

Police Protection
Less Than Significant Impact. Implementation of the Approved Project included the development of a maximum of 2,500 residential units and would increase the City’s population by approximately 8,250 residents (assuming 3.3 people per dwelling unit). Based on the established service ratio of

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-142
the City of 1.0 sworn officer per 1,000 residents, EIR No. 331 determined that the Approved Project would generate the need for approximately eight officers in order to maintain current officer-to- population ratios and continue to provide consistent level of service to the Approved Project area and remainder of the City. The City of Anaheim Police Department would ultimately determine the timing and number of new officers hired as part of its standard staffing practices. The funding for new officer positions needed to maintain acceptable citywide police protection service levels would have come from the City’s General Fund Property taxes and other fees assessed on future property owners in the residential community developed through implementation of the Approved Project would contribute to the General Fund revenues. Additionally, EIR No. 331 prescribed SC 12-2, requiring the property owner/developer to contribute to the citywide Police Facilities Capital Improvement Fee Program.

Overall, EIR No. 331 determined that existing police department facilities were sufficient to provide police protection services to the Approved Project area. As such, the Approved Project would not result in the need for a new police facility. Therefore, EIR No. 331 determined that the Approved Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, or the need for new or physically altered governmental facilities, the construction of which would cause significant environmental impacts. With implementation of SC 12-2, EIR No. 331 determined that potential impacts on police protection services would be less than significant.

Public Schools
Less Than Significant Impact. Implementation of the Approved Project included the development of a maximum of 2,500 residential units and would increase the City’s population by approximately 8,250 residents (assuming 3.3 people per dwelling unit). As previously noted, the Approved Project included the reservation of a minimum 10-acre school site in DA 3, as specified in PDF 12-1. The Orange Unified School District (OUSD) would have been required to comply with all requirements of the California Department of Education concerning the acquisition and construction of a school at the proposed location.

EIR No. 331 evaluated the potential impacts (traffic, air quality, utilities, etc.) associated with the development of a school within the Development Area 3 of the MPSP. The Approved Project allowed for the transfer of units to DA 3 from other DAs if the traffic generated by the transferred units did not exceed the amount of traffic that would be generated by a school with 800 students (as assumed in the traffic analysis prepared for the project). However, the total unit count of 2,500 would not be exceeded. In addition, EIR No. 31 prescribed SC 12-3, requiring the property owner/developer to enter into a School Impact Mitigation Agreement with the OUSD in order to mitigate impacts to the school district. With implementation of PDF 12-1 and SC 12-3, EIR No. 331 determined that potential impacts on public schools would be less than significant.

Libraries
Less Than Significant Impact. Implementation of the Approved Project and the associated increase in population would increase demand on the City’s libraries, with the Canyon Hills Library likely to be the most affected due to its proximity to the Specific Plan Area. The library would be planned to 3-143
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

benefit all development in the East Santa Ana Canyon area, which includes the Approved Project site.

The City of Anaheim Public Library Services Division has determined the existing Canyon Hills library would be inadequate to serve the approved and proposed development in the Anaheim East Santa Ana Canyon area, including the Approved Project.

The Library Services Division had plans to develop a new library west of Weir Canyon Road on the site of the existing East Anaheim Police Station. The area of benefit for the proposed library is the area located south of SR-91 and east of Mohler Drive and Canyon Rim Road. This area includes The Highlands at Anaheim Hills, The Summit of Anaheim Hills, and Sycamore Canyon. The Approved Project is also included within the area of benefit. All developments within the area of benefit are required to pay fees for the proposed library, in accordance with City Council Resolution 89R-235 (June 13, 1989) as may hereinafter be amended, which adopted the Public Library Facilities Plan for the East Santa Ana Canyon area, and in conjunction with Chapter 17.08, Section 17.08.385 of Anaheim Municipal Code. The existing communities of The Highlands at Anaheim Hills, The Summit of Anaheim Hills, and Sycamore Canyon were expected to pay the required fees. As the Approved Project is within the area of benefit, the Approved Project would be required to pay fees for the construction of library facilities in the East Hills Planned Community, as specified in SC 12-14. With implementation of SC 12-14, EIR No. 331 determined that potential impacts on library services would be less than significant.

Proposed Project
Fire Protection
Less Than Significant Impact. The Approved Project considered large-scale residential development within DA 5. At that time a new fire station was proposed within the Approved Project area that would provide fire protection for this area. While implementation of the Proposed Project would not preclude the development of residential uses within DA 5, implementation of the Proposed Project would develop DA 5 with two cemeteries as a conditional use. With the proposed change in land use to from residential to cemetery uses within DA 5, the potential risk to person and property is substantially reduced. Construction of the fire station could be pursued in the future if determined warranted. An administration building and a building associated with the maintenance yard are proposed but would not require additional fire protection services beyond what the City currently provides for the area as development of the two buildings would not induce a substantial population increase at the site. Compliance with all applicable Anaheim Fire Department standards and regulations would be incorporated into the design of the Proposed Project to address fire protection of any structures. Compliance with City of Anaheim Council Policy No. 5.3 (Hillside Grading), which includes provisions for fuel modification plans per Anaheim Fire Department’s municipal codes and standards. Further, planting plans associated with the Proposed Project would comply with Anaheim Fire Department’s Acceptable Planting Species guidelines. Therefore, implementation of the Proposed Project would result in less than significant impacts associated with fire protection services, and SC 12-1 would not be applicable to the Proposed Project.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-144
Police Protection
Less Than Significant Impact. The Approved Project anticipated large-scale residential development within the Approved Project area and identified the potential need for eight additional police officers. This need was associated with the generation of 8,250 additional residents facilitated by the Approved Project’s development of up to 2,500 dwelling units and commercial land uses within DA 6. With the construction of the proposed cemeteries rather than the 1,595 units planned within DA 5, the Proposed Project would not result in an identified need for additional police services. As previously stated, operations of the Proposed Project are anticipated to generate approximately 12 jobs, which may necessitate additional police presence. However, the Proposed Project would ultimately result in a reduced scale of residential development within the Specific Plan Area as a whole and, as such, would reduce the need for additional police officers from what was analyzed in EIR No. 331. Therefore, implementation of the Proposed Project would result in less than significant impacts associated with police protection services, and SC 12-2 would not be applicable to the Proposed Project.

Public Schools
Less Than Significant Impact. The Approved Project anticipated large-scale residential development within the Approved Project and identified the potential need for a school site. This school site was planned within DA 3 of the Approved Project area. The need for the development of a school was associated with the addition of approximately 1,045 cumulative K-12 students, to the Approved Project area and the Orange Unified School District under the Approved Project. While implementation of the Proposed Project would not preclude the development of residential uses within DA 5, implementation of the Proposed Project would develop DA 5 with two cemeteries as a conditional use. With the proposed change in land use to from residential to cemetery uses, the Proposed Project would reduce the demand for a new school within the Specific Plan Area.

Therefore, implementation of the Proposed Project would result in less than significant impacts on public schools, and PDF 12-1 and SC 12-3 would not be applicable to the Proposed Project.

Libraries
Less Than Significant Impact. The Approved Project anticipated large scale residential development within the Approved Project area and identified the potential need for a new library. While implementation of the Proposed Project would not preclude the development of residential uses within DA 5, implementation of the Proposed Project would develop DA 5 with two cemeteries as a conditional use. With the proposed change in land use to from residential to cemetery uses, the Proposed Project would reduce, if not eliminate, the need for additional library services identified under the Approved Project. Therefore, implementation of the Proposed Project would result in less than significant impacts on library services and SC 12-14 would not be applicable to the Proposed Project.

Would the project have insufficient water supplies available to serve the project (including large scale developments as defined by Public Resources Code Section 21151.9 and described in Question No. 20 of the Environmental Information Form) from existing entitlements and resources, or are new or expanded entitlements are needed?
3-145
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

Would the project require or result in the construction of new water facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Approved Project
Less Than Significant Impact with Mitigation Incorporated. In 2001, SBs 610 and 221 were enacted to require coordination between land use decisions and information on water supply. SB 610 requires preparation of water supply assessments (WSAs) as part of the environmental documentation for certain projects as defined in Water Code Section 10912 [a], and SB 221 requires affirmative written verification that sufficient water supply is available for certain residential subdivisions. The Approved Project involved a Specific Plan amendment and required the preparation of a WSA. A WSA was prepared for the Approved Project. Water Verifications (WVs) would have been required prior to approval of individual tentative tract maps.

Based on the City’s historical water use factors, the Approved Project was anticipated to generate an average-day water demand for residential and non-residential uses (school, fire station, and trail staging area) of approximately 1.38 million gallons per day (MGD) and irrigation water demand of

0.54 MGD, with a total demand of 1.92 MGD.

The City of Anaheim’s Rule 15C requires terminal storage (emergency supply) in the eastern reaches of the City’s service area, in addition to basic storage volume. Terminal storage is typically 150 percent of the maximum day demand; however, the terminal storage requirement for the Approved Project was reduced to exclude common-area landscaping demands. This exclusion was based on the provision of irrigation systems that would be controlled by automatic programmable irrigation controllers that utilize California Irrigation Management System (CIMIS) Data to adjust water times and durations based on daily evapotranspiration data, as detailed in PDF 12-3. Communitywide irrigation control would be provided by a centralized irrigation control system designed to separately valve hydrozones based on plant water requirements, exposure, and terrain characteristics. To compensate for the reduction in the size of the terminal storage reservoir, the City would have had the capability to turn off irrigation services in the event of an emergency. The terminal storage requirement for the original project was approximately 3.9 MG.

The City of Anaheim commissioned preparation of a WSA for the Approved Project to determine whether or not the City of Anaheim Public Utilities Department would have had sufficient water to serve the Proposed Project, including dry hydrologic periods of up to 3 years for the next 20 years.

Water demands under ultimate buildout conditions were considered in the WSA. The WSA concluded that there was sufficient available water supplies for the Approved Project for the next 20 years, including during drought conditions.

The water distribution system as part of the Approved Project would have included water lines, pump stations, and reservoirs designed and constructed as part of the Approved Project, specifically to accommodate the water supply for the Approved Project. The majority of the distribution facilities would be constructed within the Specific Plan Area; however, connections to off-site water lines would have been required. The on-site water facilities, including 750-, 900-, and 1,320-foot- zone reservoirs, would have occurred within the identified development footprint evaluated throughout EIR No. 331. No additional impacts related to construction and operation of the on-site water distribution system would have occurred.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-146
Installation of these water supply facilities were not part of the Approved Project and the impacts associated with the facilities were not considered impacts of the Approved Project. The impacts of constructing the OCWD water supply facilities were addressed in the OCWD EIR.

The Approved Project also included PDF 12-2, which required the property owner/developer to submit water improvement plans prepared in conformance with the Approved Project’s Water System Sub Area Master Plan (SAMP) to the Public Utilities Department for review and approval.

In addition, EIR No. 331 prescribed SC 12-4, requiring water verification studies from the Public Utilities Department to confirm sufficient water supply in accordance with SB 221; SC 12-5, requiring the property owner/developer to demonstrate to the Public Utilities Department that water consumption reduction measures have been implemented; Mitigation Measure (MM) 12-1, requiring payment of a proportionate share of water supply source to the Public Utilities Department to meet the project increases in water demand in accordance with Rule 15C; MM 12-2, requiring a Traffic Management Plan for street improvements; and MM 12-3, requiring a utility layout and trenching plan for existing public streets. With implementation of PDFs 12-2 and 12-3, SCs 12-4 and 12-5, and MMs 12-1, 12-2, and 12-.3, EIR No. 331 determined that potential impacts related to water service and supply would be less than significant.

Proposed Project
Less Than Significant Impact with Mitigation Incorporated. As identified in the Project Description, three separate on-site services for fire protection, domestic and irrigation water would be provided to both the upper and lower pads and would be conveyed within a single 20” water line point of service provided by Anaheim Water Department on Santa Ana Canyon Road. The three separate services would be connected at the project entry and located within the typical easement section of the exterior access road. The 20” main water line would connect to the existing 30-inch line located off-site in Santa Ana Canyon Road, near Woodcreek Road. Submeters would be provided for the fire, domestic and irrigation lines between the parcels / cemeteries. Two irrigation booster pump stations would be constructed on site to assist in conveying water. Alternatively, a groundwater well may be constructed on site to provide potable water and irrigation services to both cemeteries. The location and depth of the well is currently being evaluated. On-site water pipelines would be connected to the groundwater well within the property. If a groundwater well is constructed on site to provide potable water, the project applicant would be required to obtain a permit from the State Water Resources Control Board. There currently are no reclaimed water lines in this portion of the City and all activities on site would utilize potable water or well water as an alternative.

If the Proposed Project constructs a groundwater well, a water tank reservoir would be required in the northeast corner of the project site to meet project demand for landscape irrigation services and potable water at the administrative building, committal shelter, and maintenance facility on the lower pad and similar facilities on the upper pad. The proposed tank would be 75 feet in diameter and 40 feet high, providing a minimum of 672,000 gallons of storage capacity. The 680-foot-zone reservoir would be located and designed in a manner which screens it from public view pursuant to community design guidelines specified in the City’s Mountain Park Specific Plan. The need for and sizing of any reservoir would be subject to analysis of water demand associated with maximum day irrigation, on-site buildings, and fire flow requirements. 3-147
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

As identified in EIR No. 331, water demand for the Approved Project was determined to be 1.92 MGD (1.38 MGD for residential/non-residential water demand and 0.54 MGD for irrigation water demand) and was based on the City’s historical water use factors at the time EIR No. 331 was prepared. As provided in the Preliminary Water Study for Gypsum Canyon Cemetery,9 which was approved by the City in 2024, the Proposed Project is anticipated to have a water demand of 2.2 MGD for irrigation services for both cemeteries and 0.04 MGD for domestic uses (potable water at the administrative building, committal shelter, and maintenance facility, for a total of 2.24 MGD.

According to the City’s Urban Water Management Plan (UWMP), Anaheim depends on a combination of imported and local supplies to meet its water demands and has taken numerous steps to ensure it has adequate supplies. Further, the City’s UWMP indicates that there is sufficient supply to meet projected demand associated with buildout of the City’s General Plan due to diversified supply and conservation measures. In addition, Metropolitan’s 2020 UWMP finds that Metropolitan can meet full-service demands of its member agencies from 2020 through 2045 during normal years, single dry years, and multiple dry years. Therefore, although the anticipated water demand for the Proposed Project is slightly greater than the water demand identified for the Approved Project, the City anticipates adequate water supply for the Proposed Project. In addition, the Proposed Project would be required to prepare and submit a Water Supply Assessment prior to Final Map recordation and would be required to implement SC 12-4, requiring water verification studies from the Public Utilities Department to confirm sufficient water supply in accordance with SB 221. Therefore, no new impact to water supply would occur beyond what was previously identified.

Further, the Proposed Project would implement PDFs 12-2, requiring submittal of water improvement plans prepared in conformance with the SAMP; PDF 12-3, requiring irrigation systems be controlled by automatic programmable irrigation controllers; SC 12-5, requiring the property owner/developer to demonstrate to the Public Utilities Department that water consumption reduction measures have been implemented; MM 12-2, requiring a Traffic Management Plan for street improvements; and MM 12-3, requiring a utility layout and trenching plan for existing public streets. With implementation of PDFs 12-2 and 12-3, SCs 12-4 and 12-5, MMs 12-2 and 12.3, potential impacts related to water service and supply with development of the Proposed Project would be less than significant, similar to the Approved Project.

Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has inadequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Would the project require or result in the construction of new wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects?

9 Huitt Zollars. 2024. Preliminary Water Study for Gypsum Canyon Cemetery. February 9.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-148
Approved Project
Less Than Significant Impact with Mitigation Incorporated. Collection of wastewater generated by the Approved Project would be the responsibility of the City of Anaheim, while OCSD would be responsible for regional conveyance and treatment of the wastewater through the Santa Ana Regional Interceptor (SARI) pipeline to the Fountain Valley Regional Wastewater Treatment Plant.

Because both of these agencies are involved in the collection and/or treatment of wastewater, anticipated wastewater flows for the Approved Project were calculated based on each agency’s methodology. Using the prescribed methodology, the Approved Project would generate an average daily wastewater flow of approximately 0.99 MGD assuming the City of Anaheim generation factors, and 0.91 MGD assuming the OCSD generation factors. The on-site collection systems would have been constructed to accommodate the anticipated sanitary sewer wastewater flow; therefore, both the east and west basin systems would have been of appropriate sizing and configuration to accommodate the sanitary sewer flows from the Approved Project.

The sanitary sewer lines in The Summit of Anaheim Hills were designed to accommodate 161,200 gallons per day from the Mountain Park project site. As noted in EIR No. 331, approximately 90,367 gallons of wastewater per day would have been generated by Approved Project uses west of SR-241 and would need to be accommodated in the existing sanitary sewer lines.

A pipe capacity constraint existed downstream in an existing 8-inch pipe segment on Running Springs Drive. The capacity constraint in this pipe segment, approximately 200 feet in length, would require upsizing to a 10-inch pipe diameter. All other existing sanitary sewer pipelines in the Summit Community have the existing capacity to receive west basin (DAs 3 and 7) wastewater flows from the Specific Plan Area.

There are currently no local sewer lines in the vicinity of the Approved Project site to serve wastewater flows from the east basin; however, the SARI pipeline is less than 0.5 mile from the project site. The Approved Project would require construction of sewer lines to connect to the SARI line. There is sufficient capacity in the SARI line to accommodate the wastewater from the Approved Project. As previously noted, the OCSD Strategic Plan accommodates the wastewater previously estimated to be generated by the Approved Project (approximately 3.7 MGD). The Approved Project would generate less than 1 MGD of wastewater. Therefore, the SARI line would have sufficient capacity to accommodate the wastewater generated by the Approved Project, even if it is necessary for all of the wastewater from the Approved Project (west and east basins) to be handled by facilities east of SR-241. During preparation of its updated Master Plan, OCSD hydraulically modeled the SARI pipeline in the vicinity of the project site and concluded that there was sufficient capacity in the SARI pipeline to receive Approved Project flows.

The installation of local sewer lines to deliver wastewater to the SARI line is included as part of the Approved Project and these facilities would be sized to accommodate the estimated sanitary sewer flows from the Approved Project. Additionally, sanitary sewer lines would be installed in the street rights-of-way and the direct impacts associated with installation of these facilities were addressed in EIR No. 311.
3-149
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

The Approved Project also included PDF 12-4 requiring the property owner/developer to conduct sewer monitoring at two similar developments within the City to verify sewer generate rates. In addition, EIR No. 331 prescribed SCs 12-6 and 12-7, requiring the payment of fees to the City of Anaheim and OCSD for sewer service and sewer connections; MM 12-4, requiring approvals, permits and/or easement rights of way from private property owners for off-site wastewater line connections in DAs 1, 2, 4, and 5; and MMs 12-5 and 12-6, requiring the submittal of sewer improvement plans for development within all development areas. With implementation of PDF 12- 4, SCs 12-6 and 12-7, and MMs 12-4, 12-5, and 12-6, EIR No. 331 determined that potential impacts related to wastewater service and supply would be less than significant.

Proposed Project
Less Than Significant Impact. On-site sewage would be collected via pipelines and conveyed to on- site holding tanks with the upper and lower pads. These holding tanks would be regularly monitored and cleaned out, as needed, with a vacuum truck. This configuration for sewer collection would eliminate the need to connect to local sewer lines for transport to a local treatment plant. The limited quantities of sewage collected on site would be delivered by truck to one of the local wastewater treatment plants for treatment. Because the Proposed Project would not connect to local sewer lines for transport to a local treatment plant, PDF 12-4, SCs 12-6 and 12-7, and MMs 12- 4, 12-5, and 12-6, would not be applicable to the Proposed Project.

There would be no new impact to wastewater treatment capacity and impacts would be less than significant, similar to the Approved Project.

Would the project result in the need for new systems or supplies, or substantial alternations related to i) electricity, ii) natural gas, iii) telephone service, or iv) cable television service/reception? Approved Project
Electricity
Less Than Significant Impact with Mitigation Incorporated. The proposed electric system for the Approved Project was described EIR No. 311 and was based on the electric demand assuming no diversity. The estimated annual electrical consumption for the Approved Project, excluding institutional uses in DA 6, was 21.8 million kilowatt-hours (kWh), which equates to approximately 8,726 kWh per year per residential unit. While sufficient power and distribution capabilities exist to provide the Approved Project with electrical service, APU does not currently have any 66-kilovolt (kV) transmission circuits or 12kV distribution circuits within the project area. Therefore, APU has determined that new electrical infrastructure, on and off site, would be required to accommodate growth in the Approved Project area.

In addition to the construction of new facilities on site, Approved Project included the removal of existing electrical facilities operated by SCE. Subsequent to the closure of Robertson’s, SCE would remove the on-site overhead power lines serving the quarry site. The identified impact areas for construction/installation of new facilities and removal of existing facilities were within the Approved Project impact area, and the potential impacts of these facilities were addressed throughout EIR No. 331. The new electrical service would be supplied by the Anaheim Public Utilities Department.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-150
Additionally, EIR No. 331 determined that the Approved Project would not materially impact the ability of the City of Anaheim’s system to serve the new and existing loads. The electric system would have been constructed for the Approved Project to accommodate the demands of the Approved Project
In addition, the Approved Project included PDF 12-5 requiring the submittal of electric system plans to the Public Utilities Department demonstrating conformation with the Public Facilities Plan of the MPSP.

EIR No. 331 also prescribed SC 12-8, requiring the property owner/developer to secure on-site electrical facilities in accordance with the City of Anaheim Public Utility Electric Rates, Rules, and Regulations; SC 12-9, requiring compliance with all State Energy Insultation Standards and City codes (i.e., Title 24 standards); SC 12-10, requiring payment of fees for electrical residential and commercial services; SC 12-11, requiring the incorporation of energy saving practices into building plans; MM 12-7, requiring submittal of a Traffic Management Plan for construction of utility improvements in roadways; MM 12-8 and 12-9, requiring submittal of preliminary electric system plans to the Public Utilities Department for development within DAs 3 and 7 and east of SR-241; and MM 12-10, requiring the payment of fees and the provision of the necessary infrastructure or installation of the electrical and communication systems.

With implementation of PDF 12-5, SCs 12-8 through 12-11, and MMs 12-7 through 10, EIR No. 331 determined that implementation of the Approved Project would not result in any impacts related to electrical service demand.

Natural Gas
Less Than Significant Impact. The Approved Project included the development of a maximum of 2,500 residential units, a fire station, a public community park, a school site, an interpretive center/store concession, a private recreation center and smaller private parks, and riding and hiking trails. The residential component of the Approved Project was estimated to consume 1.85 to 2.31 million therms annually. It should be noted that this amount did not include the nonresidential uses proposed as part of the Approved Project as SoCalGas does not compile consumption rates for these types of uses.

The natural gas for the Approved Project area would be provided via connections to existing off-site pipeline interceptions. A sole gas trench would be constructed and an 8-inch gas pipeline would be installed within the study area along Gypsum Canyon Road to serve DAs 1, 2, 4, and 5. DAs 3 and 7 would be served by an 8-inch natural gas pipeline installed in a sole gas trench extending from Weir Canyon Road.

The pipeline dimensions, location on the street, and buried depth were planned to vary from location to location and as determined by SoCalGas. Coordination between the property owner/developer and SoCalGas would occur to avoid any notable service disruptions during extension, relocation, and upgrading of services and facilities as well as to comply with California energy conservation requirements specified in California Administrative Code Title 24/25. In 3-151
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

addition, the Approved Project included PDF 12-6 requiring the submittal of natural gas plans to the Public Utilities Department demonstrating conformation with the Public Facilities Plan of the MPSP.

Installation of on-site natural gas facilities would occur during project construction and would not result in any environmental impacts beyond those identified for construction of the project as addressed in the respective sections of EIR No. 331.

In addition, EIR No. 331 prescribed SC 12-12, requiring the property owner/developer to secure on- site natural gas facilities in coordination with SoCalGas.

With implementation of PDF 12-6 and SC 12-12, EIR No. 331 determined that implementation of the Approved Project would result in less than significant impacts on natural gas service or facilities.

Telecommunication Facilities
Less Than Significant Impact. EIR No. 331 determined that telecommunication service for the Approved Project would have been provided without any adverse impact on SBC’s ability to provide telephone service in the area. Prior to construction, existing overhead facilities along Gypsum Canyon Road would be temporarily relocated to allow for grading and installation of the new underground system. Subsequent to the closure of Robertson’s, the overhead lines would need to be removed and located underground.

To serve the Approved Project, trenches, conduit, and substructures would be installed from the entrance of DAs 1, 2, 4, and 5. DAs 3 and 7 would be served by trenches, conduit, and substructures installed along Weir Canyon Road. As discussed previously for other utilities, on-site telephone facilities would be constructed within the Approved Project impact area analyzed throughout EIR No. 331. Overall, EIR No. 331 determined that implementation of the Approved Project would result in less than significant impacts on telecommunication facilities.

Cable Television Service/Reception
Less Than Significant Impact. Service to the Approved Project can be provided without any adverse impact on Adelphia’s ability to provide telecommunication service in the area. Within the Approved Project area, cable television conduits would be installed in joint trenches along with the electrical and telephone conduits for distribution to the DAs. Joint trench design would be provided by cable provider once specific development plans became available. Overall, EIR No. 331 determined that implementation of the Approved Project would result in less than significant impacts on cable television service and reception.

Proposed Project
Electric
Less Than Significant Impact. As described in the Project Description, electricity would be provided to the project site via the existing Park Substation. The Park Substation was built anticipating an electrical supply need in the eastern areas of Anaheim. The site developer would be responsible for duct bank routing and installation cost from Park Substation to DA 5. The first route would be along Santa Ana Canyon Road and loop to existing system in Oak Canyon Rd. The second route would be

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-152
along Santa Ana Canyon Road and looped to existing system in Weir Canyon Road. All electrical transmission facilities entering the project site from off-site would be provided in underground conduit to both the upper and lower pads within the exterior entry road cross section.

Once on site, the electrical transmission facilities would connect to a 480/277-volt transformer, which would allow electricity to be distributed on site to buildings, roadway safety lighting, the existing flagpole and miscellaneous site lighting.

While implementation of the Proposed Project would not preclude the development of residential uses within DA 5, implementation of the Proposed Project would develop DA 5 with two cemeteries as a conditional use. With the proposed change in land use to from residential to cemetery uses, the Proposed Project would greatly reduce the anticipated electrical demand. The Proposed Project would develop DA 5 with a public cemetery and a State veterans cemetery, with some accessory buildings such as an administrative building and building associated with the maintenance yard.

Electrical demand associated with the Proposed Project would primarily be associated with lighting of the cemetery, the existing flagpole, and accessory buildings. Compared to the electrical demand of the Approved Project within DA 5, which consisted of 1,595 residential units, the electrical demand of the cemetery and accessory buildings would be minimal. As such, implementation of the Proposed Project would not create an additional, or increased, impact from what was considered under the Approved Project.

In addition, the Proposed Project would implement PDF 12-5, SCs 12-8, 12-9, and 12-11, and MMs 12-7 and 12-10, as described above. SC 12-10 would not apply to the Proposed Project as there would be no residential or commercial development within DA 5 and MMs 12-8 and 12-9 would not apply as the Proposed Project does not include development of DAs 3 or 7, or development east of SR-241. With implementation of PDF 12-5, SCs 12-8, 12-9, and 12-11, and MMs 12-7 and 12-10, impacts related to electrical service demand would be less than significant, similar to the Approved Project.

Natural Gas
Less Than Significant Impact. Natural gas usage with implementation of the Approved Project was associated with the previously proposed residential uses at the site. The Proposed Project would develop the site with two cemeteries and is not expected to use natural gas. Therefore, implementation of the Proposed Project would result in less natural gas usage as compared to the Approved Project. As such, implementation of the Proposed Project would not create an additional, or increased, demand compared to what was considered under the Approved Project.

Because the Proposed Project is not expected to use natural gas, PDF 12-6 and SC 1-12 would not apply to the Proposed Project. Impacts related to natural gas service and facilities would be less than significant, and less than the Approved Project.

Telecommunications
Less Than Significant Impact. Demand for telecommunication services with implementation the Approved Project was primarily associated with the previously proposed residential uses at the site.

Although the Proposed Project would require telecommunication services from a local provider 3-153
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

(currently Spectrum) for use in the administration building and potentially the maintenance building, as the Proposed Project would develop the site with two cemeteries as opposed to residential uses, the need for telecommunications services within DA 5 would be substantially less.

Therefore, implementation of the Proposed Project would not create an additional, or increased, impact from what was considered under the Approved Project. Impacts related to telecommunication service and facilities would be less than significant, and less than the Approved Project.

Would the project be served by a landfill with insufficient permitted capacity to accommodate the project’s solid waste disposal needs?
Would the project comply with Federal, State, and local statues and regulations related to solid waste?
Approved Project
Less Than Significant Impact. EIR No. 331 estimated a generation rate of 4,287.8 tons (4,215.8 tons/year for residential, and 72 tons for the school) of solid waste annually. The Orange County Integrated Waste Management District (OCIWMD) indicated that adequate capacity for the Approved Project was available within the Orange County landfill system, which includes three active landfills. Therefore, no significant impacts related to landfill capacity would result from implementation of the Approved Project.

It should also be noted that the City of Anaheim complies with all federal, State, and local statutes and regulations related to solid waste. Assembly Bill 939 requires that after 2000, the City of Anaheim divert at least 50 percent of solid waste from landfills through conservation, recycling, and composting. In 2000, the City diverted 50 percent of its solid waste, as required (City of Anaheim 2004). This was achieved through City participating in over 20 programs such as residential curbside recycling to facilitate the diversion of waste from landfills. As identified in the Green Element of the City’s General Plan, the City has also adopted a Source Reduction and Recycling Element (SRRE) and a Household Hazardous Waste Element (HHWE) (part of the Orange County Integrated Waste Management Plan) to develop programs to address household hazardous waste State law.

EIR No. 331 prescribed SC 12-13, requiring submittal of a Solid Waste Management Plan with recycling capabilities to the Department of Public Works for review and approval. With implementation of SC 12-13, EIR No. 331 determined impacts associated with landfills and solid waste would be less than significant.

Proposed Project
Less Than Significant Impact. Demand on landfill facilities with implementation of the Approved Project was primarily associated with the previously proposed residential uses at the site. Although the Proposed Project would generate some solid waste during operation, as the Proposed Project would develop the site with two cemeteries as opposed to residential uses, the need for landfill services would be substantially less when compared to what was analyzed in EIR No. 331 for DA 5.

Therefore, implementation of the Proposed Project would not create an additional, or increased, impact from what was considered under the Approved Project.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-154
Given the proposed change in development type within DA 5, the Proposed Project would result in a substantial reduction in demand for public services and utilities from what was identified for the Approved Project. In addition, SC 12-13, requiring submittal of a Solid Waste Management Plan with recycling capabilities to the Department of Public Works for review and approval, would remain applicable to the Proposed Project. With implementation of SC 12-13, impacts associated with landfills and solid waste would be less than significant, similar to the Approved Project.

Would the project conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigation an environmental effect?
Approved Project
Less Than Significant Impact. EIR No. 331 identified goals and policies in the City of Anaheim General Plan Public Services and Facilities Element that would be applicable to the Approved Project. In addition, EIR No. 331 indicated that a NOP comment letter from SCAG identified several policies from the Growth Management Chapter as being relevant to the Approved Project regarding public services and utilities. The identified goals and policies from the Public Services and Facilities Element include providing sufficient staffing, equipment, and facilities for fire protection, police protection, electricity, water, wastewater, solid waste, natural gas, and education. The identified policies form the SCAG Growth Management Chapter include encouraging patterns of development which reduce costs on infrastructure and supporting local jurisdictions and service providers in their efforts to develop sustainable communities and provide accessible and effective services such as public education, housing, healthcare, social services, recreational facilities, law enforcement, and fire protection.

EIR No. 331 included a consistency analysis with the City of Anaheim General Plan Public Services and Facilities Element and the policies from the Growth Management Chapter identified by SCAG based on the analysis of previous significance thresholds in Section 4.12, Public Services and Utilities, of EIR No. 331 and determined that the Approved Project would not conflict with any of the identified goals and/or policies. Impacts related to conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the Approved Project would be less than significant, and no mitigation was identified.

Proposed Project
Less Than Significant Impact. As discussed throughout this section of the Addendum, the Proposed Project would not result in insufficient staffing, equipment, and facilities related fire protection, police protection, electricity, water, wastewater, solid waste, natural gas, and schools. In addition, the Proposed Project would not result in substantial infrastructure construction to meet the needs of the Proposed Project. Therefore, the Proposed Project would not conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the Proposed Project, similar to the Proposed Project.
3-155
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

3.12.3 Cumulative Public Services and Utilities Impact
Approved Project
Less Than Cumulatively Considerable Impact. The cumulative study area for public services and utilities would be the service area for service and utility providers, which can range from a neighborhood to an entire region. EIR No. 331 found that in combination with other projects in the cumulative study area, the Approved Project would result in an increased demand for public services and utilities. Generally, the various service agencies incorporate growth anticipated in the adopted General Plan into their long-range planning programs. Impacts to public services resulting from cumulative project development would be mitigated by the individual projects to ensure that acceptable service levels are maintained pursuant to State CEQA Guidelines. Standard measures such as the payment of fees and incorporation of needed facilities have been or would be addressed for each project as determined appropriate in individual environmental analyses. Should it be determined that additional public service and/or utility facilities are required to accommodate the needs of the City, individual construction projects would be subject to review under CEQA. Potential impacts from the facilities would need to be addressed, and mitigation developed, as necessary.

EIR No. 331 noted that the Approved Project would not require the construction of additional public services or utility facilities beyond those proposed as part of the original project and analyzed in EIR No. 331. The Approved Project therefore would not have a significant impact related to public services and utilities. Because individual development projects within the cumulative study area would be responsible for their individual incremental public service and utility contributions and because the Approved Project’s impacts would be individually less than significant, EIR No. 331 determined that the Approved Project would not result in a significant cumulative contribution to public services or utilities.

Proposed Project
Less Than Cumulatively Considerable Impact. As with the Approved Project, the cumulative study area for public services and utilities would be the service area for each service and utility provider.

The cemetery uses proposed under the Proposed Project would generally decrease the demand for public services and utilities compared to the Approved Project, which determined that no cumulative impacts would occur under the residential buildout of DA 5. Further, as previously stated, each individual project within the cumulative study area would be required to address potentially considerable incremental utility and service demand increases pursuant to State CEQA Guidelines. Therefore, potential impacts on public services and utilities associated with the Proposed Project would not be cumulatively considerable, similar to the Approved Project.

3.12.4 Findings Related to Public Services and Utilities

3.12.4.1 No New Significant Effects Requiring Major Revisions to the Certified EIR Based on the foregoing analysis and information, there is no evidence that the Proposed Project requires a major change to EIR No. 331. The Proposed Project would not result in new significant environmental impacts related to public services and utilities, and there would not be a substantial increase in the severity of impacts described in EIR No. 331.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-156

3.12.4.2 No Substantial Change in Circumstances Requiring Major Revisions to the Certified EIR The currently proposed changes to the Specific Plan Area would greatly reduce the originally identified impacts outlined in EIR No. 331. The greatly reduced impacts would not require revisions to the analysis in EIR No. 331. There is no information in the record or otherwise available that indicates that there are substantial changes in circumstances pertaining to public services and utilities that would require major changes to EIR No. 331.

3.12.4.3 No New Information Showing Greater Significant Effects than the Certified EIR This Addendum has analyzed all available relevant information to determine whether there is new information that was not available at the time EIR No. 331 was certified that could indicate that a new significant effect not reported in that document may occur. Based on the information and analyses above, there is no substantial new information indicating that there would be a new significant impact related to public services and utilities requiring major revisions to EIR No. 331.

3.12.4.4 No New Information Showing the Ability to Reduce Significant Effects in the Certified EIR There is no new information, mitigation, or alternatives to the Proposed Project that would substantially reduce one or more significant impacts pertaining to public services and utilities identified and considered in EIR No. 331.

3.12.5 Standard Conditions and Mitigation Measures
Standard conditions (SC) 12-1 through 12-14 were prescribed to the Approved Project. Of these, SC 12-5 through 12-9, 12-11, and 12-13 would remain applicable to the Proposed Project, while the remaining standard conditions would pertain to residential-scale utilities and therefore would not be relevant to the proposed cemetery uses.

SC 12-5 Prior to final building and zoning inspections, the property owner/developer shall demonstrate to the Public Utilities Department that water consumption reduction measures have been implemented as required by State law and in accordance with the Water Utilities Rates, Rules and Regulations. Where appropriate, plans submitted for building permits shall include notes on plans that indicate the measures that will be utilized to reduce water consumption. Such measures where feasible and appropriate shall include, but are not limited to:
a. Low-flush toilets and urinals (Health and Safety Code Section 17921.3); b. Maximum flow rate of all new showerheads, lavatory faucets, and sink faucets (Title 20, California Code of Regulations Section 1604[f]); c. Appliances certified by manufacturer to comply with regulations established by applicable efficiency standards (Title 20, California Code of Regulations Section 1606[b]);
d. Public lavatories equipped with self-closing faucets that limit the flow of hot water (Government Code Section 7800);
3-157
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

e. Hot water pipes insulated to reduce water used before hot water reaches equipment or fixtures (Title 24, California Code of Regulations Section 2-5352[i] and 0]);
f. Conservation reminders posted in rooms and restrooms; g. Thermostatically controlled mixing valve for bath/shower; and h. Implementation of efficient irrigation systems to minimize runoff and evaporation.

SC 12-8 Prior to approval of final tract or parcel maps, the property owner/developer shall install, bond for, or otherwise secure on-site electrical facilities in accordance with the City of Anaheim Public Utility Electric Rates, Rules and Regulations, and provide written evidence of this fact to the Public Utilities Department.

SC 12-9 The Proposed Project shall comply with all State Energy Insulation Standards Requirements (as part of the CBC), as adopted by and the City of Anaheim City Council, codes in effect at the time of application for building permits. (Commonly referred to as Title 24, these standards are updated periodically to allow consideration and possible incorporation of new energy efficiency technologies and methods. Among other things, Title 24 covers the use of energy efficient building standards, including ventilation, insulation and construction and the use of energy saving appliances, conditioning systems, water heating, and lighting.) Plans submitted for building permits shall include written notes demonstrating compliance with energy standards and shall be reviewed and approved by the Building Division as part of the plan review process prior to issuance of building permits.

SC 12-11 Prior to issuance of each building permit, the property owner/developer shall incorporate the following energy saving practices into building plans. The property owner/developer shall implement, to the extent feasible, these energy saving practices, in compliance with Title 10 of the Anaheim Municipal Code, prior to each final building and zoning inspection:
a. Consultation with the Public Utilities Department energy conservation experts for assistance with energy conservation design features. b. Use of electric motors designed to conserve energy.
c. Use of special lighting fixtures such as motion sensing light switch devices and compact fluorescent fixtures in place of incandescent lights. d. Use of T8 lamps and electronic ballasts. Metal halide or high-pressure sodium for outdoor lighting.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-158
SC 12-13 Prior to approval of any site plans, tentative tract or parcel maps, the property owner/developer shall submit a Solid Waste Management Plan with recycling capabilities to the Department of Public Works, Streets and Sanitation Division for review and approval. Refuse collection and disposal for the Proposed Project shall comply with AB 939, SB 1383, the County of Orange Integrated Waste Management Plan, and the City of Anaheim Integrated Waste Management Plan.

Mitigation measures (MM) 12-1 through 12-10 were identified to reduce potentially significant impacts of the Approved Project. Of these, MM 12-2, 12-3, 12-7, and 12-10 would remain applicable to the Proposed Project. MM 12-1 would continue to apply to the Proposed Project; however, as the requirement to meet Rule 15C, which requires the property owner/developer shall pay the Public Utilities Department a proportionate share of a water supply source to meet the projected increases in water demands, expires in 2024, the mitigation measure would no longer be applicable after 2024. In addition, MM 12-6 would not apply to the Proposed Project as the Proposed Project would connect to local sewer lines for transport to a local treatment plant. The remaining MM would not be applicable to the Proposed Project as they pertain to residential-scale utilities, while the Proposed Project is concerned with cemetery uses.

MM 12-1 Prior to the issuance of the first building permit, the property owner /developer shall pay the Public Utilities Department a proportionate share of a water supply source to meet the projected increases in water demands in accordance with Rule

15.C, Section 3, of the Public Utilities Rates, Rules, and Regulations. Although the Water Supply Assessment concluded that there is adequate capacity to serve the Proposed Project, an additional water supply source will ensure that there is no loss of redundancy and/or reliability to the city water supply system.

MM 12-2 Prior to approval of street improvement plans, the property owner/developer shall submit Traffic Management Plans to the City of Anaheim Department of Public Works and Yorba Linda Public Works Department for proposed street improvements within the respective jurisdictions for review and approval. The Traffic Management Plans shall describe traffic control measures that shall be implemented to maintain traffic flow in all directions where utility improvements are being implemented in existing roadways. Said traffic management measures shall be implemented on- going during road construction.

MM 12-3 Prior to approval of the first utility or infrastructure plan serving each development area with impacts to public streets, the property owner/developer shall submit a utility layout and trenching plan to the Department of Public Works for all existing public streets. Trench replacement shall, at a minimum, conform to Public Works Standard Detail No. 132. Joint trenches shall be used whenever practicable. The asphalt pavement restoration widths shall be approved by the Department of Public Works based on anticipated impact of construction and layout of trenches within the public right-of-way.

MM 12-7 Prior to approval of street improvement plans, the property owner/developer shall submit Traffic Management Plans to the Department of Public Works describing 3-159
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

traffic control measures that shall be implemented to maintain traffic flow in all directions where utility improvements are being implemented in existing roadways.

The traffic control measures may include flagmen, appropriate signage and traffic control barriers consistent with City of Anaheim requirements, or other appropriate measures. The Traffic Management Plans shall be reviewed and approved by the Department of Public Works, Traffic Engineering Division.

MM 12-10 Prior to issuance of the first building permit for each tentative tract or parcel map, the property owner/developer shall pay fees and provide the necessary infrastructure for the installation of the on-site and off-site electrical and communication systems to serve said tract, designed and phased to provide electrical service for the development areas within the project site. This shall include line extensions from the Park Substation to the development site. The applicable improvements shall be installed prior to the first final building and zoning inspection for the tract or parcel map.

3.13 RECREATION

3.13.1 Existing Environmental Setting
According to EIR No. 331, there are currently no recreational uses located on the project site. There is an existing unimproved trail which traverses the project site in a north-south direction and consists of an unimproved dirt road used for ranch operations on site. The trail is currently not accessible to the public and is within dedicated open space areas including The Nature Conservancy Anaheim Conservation Easement (TNC ACE) and the Natural Communities Conservation Plan/Habitat Conservation Plan (NCCP/HCP).

EIR No. 331 mentions there are there are over 2,000 acres of off-site recreational uses within the City of Anaheim and surrounding area that would serve future residents of the project site including a State Park, several county regional parks, and local parks. In addition to these park facilities, there are a variety of other public recreational opportunities within the local area, including biking, equestrian uses, hiking, and golfing. Existing and planned recreation facilities are discussed in accordance with the Proposed Project. Since certification of EIR No. 331, OC Parks has established the Gypsum Canyon Wilderness area to the east of the project site. Included within the Wilderness Area is the Gypsum Canyon Wilderness Trailhead located south of the Gypsum Canyon and East Santa Ana Canyon Road intersection. The Gypsum Canyon Trailhead is facilitated by OC Parks with a scheduled day use and has 5 separate trails that range from easy to moderate levels and can be utilized through hiking or mountain biking.

3.13.2 Comparison of Impacts for the Approved Project and the Proposed Project Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Approved Project
Less Than Significant Impact. The Approved Project is located near a variety of existing recreational uses, including parks, trails, and other facilities. Based off the previous analysis, the project was

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-160
expected to generate approximately 8,250 new residents in the City of Anaheim. The City’s General Plan identified park needs and areas within the City and utilized a ratio of two acres of parkland for every 1,000 residents. Based on the 8,250 new residents, the Approved Project was expected to generate 16.5 acres of publicly owned park and recreational areas in the City. The parkland demand generated by the Approved Project would be accommodated through the provision of an improved 15-acre community park within the Mountain Park Specific Plan DA 3, west of SR-241. This park would serve the future project residents as well as those in surrounding communities. This would be an active sports park providing facilities for tennis, basketball, softball, soccer, and football.

Additionally, the park would be adjacent to the proposed school site allowing for joint use of these public facilities. Although they do not count towards meeting the park fee credit, private recreation facilities, including a community recreation center, between DAs 4 and 5, one- and three-acre private recreation facilities within DAs 4 and 5; and five pocket parks (approximately 0.75 acre each) in DA 5 would be provided as part of the Approved Project.

Though the Approved Project included provisions that would enable future development within the Specific Plan Area, it also provides for the preservation of open space/natural habitat areas, which would connect to existing regional open space areas, including:
• Coal Canyon Biological Corridor to the east;
• Fremont Cayon and Weir Canyon to the south; and
• Featherly Regional Park to the north.

The Approved Project included implementation of recreational trails and bikeways. Specifically, a segment of the Gypsum Canyon Creek Trail, a public regional riding and hiking trail along Gypsum Canyon Creek, was proposed to be constructed and would connect to the Featherly Regional Park, Santa Ana River, and the existing unimproved Gypsum Canyon Creek Trails. This segment would be designed to County of Orange Standards and would serve equestrian uses, mountain bikes, and hiking. A trail staging area would be in DA 6. Class II on-road bikeways were proposed as part of the project and would provide a link to off-site bikeways that are either currently existing or are planned for construction in the future.

As mentioned in EIR No. 331, development of the Mountain Park Specific Plan Area with residential uses would increase demand on state, regional and local parklands and recreational areas in proximity to the project site; however, this increased demand would be accommodated primarily through provision of the on-site public and private recreation facilities described above. EIR No. 331 concluded that any increased demand on off-site park and recreational facilities would be negligible and that the Proposed Project would not cause deterioration of these facilities to occur or be accelerated.

Proposed Project
Less Than Significant Impact. The Proposed Project would construct a public cemetery and a State veterans cemetery within DA 5 of the MPSP. The cemetery use would not generate demand for park facilities. Furthermore, the Proposed Project would eliminate the dwelling units previously proposed and would result in a decreased demand on the neighboring recreational facilities and a reduced on- site parkland dedication requirement. The Proposed Project would thus not cause deterioration of 3-161
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

these facilities to occur or be accelerated. The conclusions of EIR No. 331 regarding the demand for recreational resources remain valid.

Would the project include recreational facilities or require the construction or expansion of recreational facilities that might have an adverse physical effect on the environment? Approved Project
Less Than Significant Impact. EIR No. 331 mentions the project would require the construction of new recreational facilities. As described previously, the Mountain Park project proposes development of a 15-acre public community park and associated amenities to fulfill the City’s parkland requirement for the project. The community park is part of the Proposed Project and the direct and indirect (visual and noise) impacts associated with construction and operation of the park have been addressed in the previous Visual and Noise sections of EIR No. 331. The project would not require the expansion of any existing recreational facilities. In addition to the proposed public community park, the project also includes a private recreation center, seven private parks, and five smaller “pocket parks”, riding and hiking trails, and Class II bikeways within the project boundaries.

It should be noted that the portion of the regional trail that follows Gypsum Creek is within the TNC ACE open space area and use of the trail would occur in compliance with the requirements established for these open space areas. Overall, EIR No. 331 found that the Approve Project would not include new recreational or expansion of existing recreational facilities that would have an adverse physical effect on the environment.

Proposed Project
Less Than Significant Impact. The Proposed Project would construct cemetery uses within DA 5. As there would be no residential development, the private recreational facilities previously identified would not be constructed. The Proposed Project proposes a 24-foot-wide OC Parks Trailhead access road and an entry gate to be constructed to provide continued access to the existing OC Parks Gypsum Canyon Wilderness trailhead. This access road would be constructed in accordance with OC Parks and City’s standards. The Proposed Project would not hinder access to the Gypsum Canyon Trailhead and the PDFs would be implemented to ensure the Proposed Project would not adversely affect the operation of the Gypsum Canyon Wilderness Area and the conclusions regarding impacts to recreational resources in EIR No. 331 remain valid.

Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for parks? Approved Project
Less Than Significant Impact. As described above, the Approved Project included both public and private recreational facilities to accommodate projected demand associated with the proposed development would not result in substantial adverse physical impacts associated with new or physically altered government facilities, need for new or physically altered government facilities and

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-162
construction of which could cause significant environmental impacts to maintain acceptable service ratio or response times for parks.

Proposed Project
Less Than Significant Impact. The Proposed Project would not generate demand for recreational facilities or parks and would not require the need for construction of new or modification to the existing parks and recreational facilities. As noted above, the Proposed Project has been designed to maintain/facilitate access to the OC Parks Gypsum Canyon Wilderness trailhead. Provision of this access is consistent with the planned recreational trail outlined in EIR No. 331 and the conclusions of EIR No. 331 remain valid.

Would the project conflict with any applicable plan, policy or regulation of an agency with jurisdiction over the project adopted for the purpose of avoiding or mitigating an environmental effect?
Approved Project
Less Than Significant Impact. The Table 3.M below addresses the consistency of the Approved Project with the relevant goals and policies outlined in the City of Anaheim General Plan and SCAG Regional Comprehensive Plan (RCP). As identified in Table 3.M, the findings in EIR No. 331 would remain consistent with the relevant goals and policies related to parks and recreation.

Proposed Project
Less Than Significant Impact. The Proposed project is not removing any public recreational facilities that were identified in the approved Mountain Park Specific Plan. The Proposed Project’s 24-foot- wide Gypsum Canyon Wilderness Trailhead access road would support local and regional recreational planning policies by providing improved and continued access to this publicly owned recreational facility. Thus, the Proposed Project would not conflict with any applicable plan, policy, or regulation of any agency with jurisdiction over the project. The Proposed Project would not impact recreational uses and the findings of EIR No. 331 remain valid.

3.13.3 Cumulative Recreation Impacts
Approved Project
Less Than Cumulatively Considerable Impact. The cumulative study area for parks and recreation would be the City, including residents who utilize public recreational facilities. EIR No. 331 anticipated the increase in population resulting from the residential uses included under the Approved Project would result in an increased demand for local and regional recreational facilities.

However, as indicated in the impact analysis in EIR No. 331 as summarized above, the Approved Project also included on-site recreational facilities, thereby reducing the level of use of off-site local and regional recreation facilities. In addition, the Approved Project would improve the local trail network. As such, the Approved Project’s cumulative contribution to the physical impact on local and regional recreational facilities was not found to be significant. 3-163
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

Table 3.M: City of Anaheim General Plan and SCAG Regional Comprehensive Plan Consistency Analysis
Goals and Policies Consistency Analysis
City of Anaheim General Plan
Green Element
Goal 9.1: Reduce single occupancy vehicle trips.
• Policy 4: Encourage bicycle and pedestrian travel by
improving the City’s trail and bikeway master plan and by providing convenient links between the trail system and desired destinations.

The Mountain Park Specific Plan project includes provision of both public trails and Class II on-road bikeways that would interconnect with existing off-site trail and bikeway systems. These facilities would allow bicycle and pedestrian travel throughout the project site and to off-site locations.

The project would be consistent with Goal 9.1 and Policy 4.

Goal 18:1: Provide sufficient indoor and outdoor park,
recreation and community service opportunities for existing and future residents and employees.
• Policy 1: Maintain a Citywide standard of at least two acres of parkland per thousand residents.
• Policy 2: Locate neighborhood parks within walking
distance of the surrounding neighborhood.
• Policy 3: Locate parks adjacent to schools, where
possible, to facilitate joint-use of publicly owned land and facilities.
• Policy 4: Design new facilities to serve as many
compatible, overlapping uses as possible such as
baseball/softball outfields also serving as soccer fields.

A total of 24.75 acres of public and private park facilities would be provided on the project site. The 15-acre public community park, with improvements, would meet the
citywide standard of two acres of parkland per thousand residents (representing a requirement for the project to provide 16.5 acres of park land or pay in-lieu fees) and would be available for use by future project residents as well as residents from surrounding areas. Due to their
proximity to existing and proposed residential uses,
residents would be able to walk to the community park site as well as proposed private recreational facilities within the project site. The project would be consistent with Goal 18.1 and Policies 1 and 2.
• Policy 6: Continue to provide a variety of park types and facilities, especially dedicated sports fields and practice fields that serve the diverse needs of Anaheim’s
neighborhoods.

The proposed community park is adjacent to the proposed school site and would allow for joint use of these public facilities, consistent with Policy 3. Conceptual site planning for the project site has taken into consideration this joint- use function to ensure that all of the area is used efficiently facilitating joint use. Overlapping uses would also be
accommodated, consistent with Policy 4.

Proposed amenities at the community park and private
parks within the project would support a variety of passive and active recreation needs. As previously noted, the
community park would provide facilities for various types of sports consistent with Policy 6,
Goal 22:1: Complete the Riding and Hiking Trails Master Plan by closing gaps in the existing network of trails. • Policy 1: Obtain dedication, acquisition and development of trails rights-of-way to City standards in order to
complete the trail network shown on the Green Plan and
Riding and Hiking Trails Master Plan.
• Policy 3: Link the trail system, where feasible, with existing or future parks and other appropriate public
areas.
• Policy 4: Link the trail system with Orange and Riverside Counties’ regional trails and with those in the Cleveland National Forest and Chino Hills State Park.
• Policy 5: Expand the trail system by incorporating trails and trail stops within public and quasi-public rights of way.

The project includes implementation of a segment of the Gypsum Creek Regional Riding and Hiking Trails that would link the Featherly Regional Park, Santa Ana River, and
Gypsum Canyon trails together. These linkages would
provide access to off-site recreational uses such as
Featherly Regional Park and Chino Hills State Park. The project would be consistent with Goal 22.1 and Policies 1, 3, and 4.

The proposed trail staging area near the intersection of Gypsum Canyon Road and Santa Ana Canyon Road would
provide for additional direct access to the County’s Regional Riding and Hiking Trail system. The project would be
consistent with Goal 22.1 and Policy 5.

The Proposed Project would include private trails interior to the project’s Development Areas. The Homeowner’s

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-164
Table 3.M: City of Anaheim General Plan and SCAG Regional Comprehensive Plan Consistency Analysis
Goals and Policies Consistency Analysis
• Policy 8: Require homeowners associations to provide
trail maintenance, repairs, and insurance, where
appropriate in private developments.

Association would maintain these facilities. The project would be consistent with Goal 22.1 and Policy 8.

Circulation Element
Goal 7.1: Protect and encourage bicycle travel.
• Policy 1: Provide safe, direct and continuous bicycle routes for commuter and recreational cyclists.
• Policy 6: Implement a bikeway system with linkages to routes in neighboring jurisdictions and regional bicycle routes.

The project includes development of several
interconnecting Class II bikeways that would also provide linkages to existing and proposed off-site bikeways.

Additionally, the location of Class II bikeways within
proposed street rights-of-way would serve to provide direct routes for both commuter and recreational cyclists. The project would be consistent with Goal 7.1, Policies 1 and 6.

County of Orange General Plan Recreation Element
Goal 1: Provide a useful, enjoyable, safe, and efficient public regional riding and hiking trail system to meet the needs and desires of the citizens of the entire County.

Goal 2: Create trail linkages between open space and
recreational facilities, between community, municipal, state and federal trail systems, and between the trail systems of surrounding counties.
• Objective 1: Implement and maintain a public regional riding and hiking trails system as depicted conceptually on the Trails Map.
• Objective 3: Adopt official design standards for
constructing and maintaining regional trails including
signage and staging areas.
• Objective 5: Develop a regional trail system to meet the recreational needs of equestrians, pedestrians (walkers, hikers, and joggers) and mountain bikers.
• Objective 9: Coordinate with other local jurisdictions and state and federal agencies regarding trails development and maintenance.

The Proposed Project includes implementation of the
portion of the public Gypsum Creek Trail extending south from the Santa Ana River Trail in Yorba Linda, to the TNC ACE boundary within the project site. This trail would
provide a link between the proposed trail staging area in Development Area 6 and the open space within the project site. The improved trail segment would connect with the existing unimproved dirt road which extends through the site southwest to a crossing under SR-241 and further to the west.

The public trail would be designed and constructed in
compliance with the County’s standards for regional riding and hiking trails and would be implemented by the property owner/developer, in coordination with the County of
Orange and City of Anaheim. The trail would be available to the public; however, the unimproved portion of the trail is within the TNC ACE and access would be subject to an
approved public access plan.

SCAG’s Regional Comprehensive Plan and Guide
Open Space Chapter
Goal 9.01: Provide adequate land resources to meet the
outdoor recreation needs of the present and future
residents in the region to promote tourism in the region.

Goal 9.02: Increase the accessibility to open space lands for outdoor recreation.

Goal 9.03: Promote self-sustaining regional recreation
resources and facilities.

Refer to the discussion of above regarding the City of
Anaheim Goal 18.1 regarding the provision of on-site
recreational uses to meet the outdoor recreation needs of present and future residents. Additionally, the Proposed Project involves the preservation of 2,163 acres of open space. The majority of this open space is part of the TNC ACE and NCCP/HCP, and as noted above, would be
accessible to the public following development and
approval of an approved access plan. Open space areas
outside of the TNC ACE and NCCP/HCP Reserve would be
accessible to the public through the use of on-site bikeways and trails.

Source: Mountain Park Specific Plan Amendment, EIR No. 331 (2005).

3-165
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

Proposed Project
Less Than Cumulatively Considerable Impact. As with the Approved Project, the cumulative study area for parks and recreation would be the City, including residents who utilize public recreational facilities. As described in the analysis presented in this section, the Proposed Project would not include any residential uses and therefore would not increase demand for recreational facilities.

Additionally, the Proposed Project proposes a 24-foot-wide access road and an entry gate to improve and provide continued access to the existing Gypsum Canyon Wilderness Area trailhead, similar to the proposed public trail under the Approved Project. Given that the Proposed Project does not increase demand for recreational resources and provides for improved and continued access to the regional recreational facilities in the Gypsum Canyon Wilderness Area, no cumulative recreational impacts are anticipated and the findings of EIR No. 331 remain valid.

3.13.4 Findings Related to Recreation

3.13.4.1 No New Significant Effects Requiring Major Revisions to the Certified EIR Based on the foregoing analysis and information, there is no evidence that the Proposed Project requires a major change to EIR No. 331. The Proposed Project would not result in new significant environmental impacts related to recreation, and there would not be a substantial increase in the severity of impacts described in EIR No. 331.

3.13.4.2 No Substantial Change in Circumstances Requiring Major Revisions to the Certified EIR The currently proposed changes to the Specific Plan Area would greatly reduce the originally identified impacts outlined in EIR No. 331. The greatly reduced impacts would not require revisions to the analysis in EIR No. 331. There is no information in the record or otherwise available that indicates that there are substantial changes in circumstances pertaining to recreation that would require major changes to EIR No. 331.

3.13.4.3 No New Information Showing Greater Significant Effects than the Certified EIR This Addendum has analyzed all available relevant information to determine whether there is new information that was not available at the time EIR No. 331 was certified that could indicate that a new significant effect not reported in that document may occur. Based on the information and analyses above, there is no substantial new information indicating that there would be a new significant impact related to recreation requiring major revisions to EIR No. 331.

3.13.4.4 No New Information Showing the Ability to Reduce Significant Effects in the Certified EIR There is no new information, mitigation, or alternatives to the Proposed Project that would substantially reduce one or more significant impacts pertaining to recreation identified and considered in EIR No. 331.

3.13.5 Standard Conditions and Mitigation Measures
No Mitigation Measures were identified in EIR No. 331 pertaining to recreation. Standard Condition 13-1 was identified as applicable to the Approved Project, but since it is concerned with DA 3, it would not apply to the Proposed Project and is therefore not included.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-166

3.14 CULTURAL RESOURCES

3.14.1 Existing Environmental Setting
According to EIR No. 331, a Cultural Resource Survey and Assessment (2002) was prepared for the MPSP area and centered on Gypsum Canyon and several tributary canyons which occur within the Santa Ana Mountains. This area forms part of the northern end of the Peninsular Range geologic province and due to the steep topography in the area, portions of the project site would have been uninhabitable. There are various Coastal sage scrub and lower chaparral habitats in the area that would have provided many important resources to local prehistoric habitants. Additionally, thick vegetation occurs along north-facing slopes and in narrow canyon bottoms and sparser vegetation occurs along ridge tops and canyon bottoms, which may have been occupied by humans. The 2002 record search and literature review indicate that several fossil localities have been recorded in the area, and that the area is underlain by several fossiliferous geologic formations that have low to high paleontological sensitivity. No cultural or paleontological resources were identified within the MPSP as part of the 2002 Cultural Resources Survey and Assessment.

A Cultural Resources Study was prepared in 2024 (LSA, 2024) to update the prior assessment and identify the potential to encounter any new cultural resources within the project site. A field survey (conducted December 9, 2023) of the project site resulted in no cultural resources being discovered.

Additionally, a record search (completed April 15, 2024) was conducted for the update and covered a 0.5-mile radius of the project site and did not identify recorded cultural resources within or adjacent to the project site. There have been five cultural resources recorded within 0.5-mile of the project site. Neither the 2002 nor 2024 studies identified any cultural resources within the project site ).

3.14.2 Comparison of Impacts for the Approved Project and the Proposed Project.

EIR No. 311 indicated that the previous Cultural Resource Survey and Assessment (2002) included a consultation with Native Americans regarding the Approved Project resulted in the incorporation of MMs 14-1 and 14-2 into Draft EIR No. 331. Coordination with the California Cultural Resource Preservation Alliance (CCRPA), an alliance of Native Americans, archaeologists, cultural resource management professionals and individuals working together to identify and preserve important archaeological and cultural sites, was conducted as part of the public review of Draft EIR No. 331. As part of this coordination and in response to the CCRPA comments on the Draft EIR, MM 14-1 was modified in EIR No. 331 to require that a Native American monitor be retained to monitor construction activities.

For the Proposed Project, the Native American Heritage Commission (NAHC) responded to a Sacred Lands File search request on January 8, 2024, and letters were sent to the respective Native American Tribes on March 12, 2024. The City has initiated consultation with the tribes designed in the NAHC response and the consultation is ongoing.

Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5 of the CEQA Guidelines? 3-167
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

Approved Project
Less Than Significant Impact with Mitigation. EIR No. 331 indicated that no archaeological sites, as defined in resource pursuant to Section 15064.5 of the State CEQA Guidelines, have been identified within the project site, however, such resources have the potential to exist in the immediate vicinity of the study area for the Approved Project. EIR No. 331 did identify the potential for subsurface cultural deposits during grading activities, which would be considered a potentially significant impact. Mitigation Measures 14-1 and 14-2 were incorporated into EIR No. 331 and with implementation of these measures, impacts to cultural resources were reduced to less than significant.

Proposed Project
Less Than Significant Impact with Mitigation. The Proposed Project would involve substantial grading within DA 5 to construct the pads for the proposed cemeteries and on-site roads and infrastructure similar to the proposed development anticipated in the Approved Project, including areas previously disturbed and filled by mining activities and some alluvial deposits (as described in Section 3.3 above). The 2024 Cultural Resource Study includes an updated records search and field survey of the project, and no cultural or tribal resources were identified within the project site. As there were no historical resources identified within the previous EIR No. 331 nor with the 2024 Study, with implementation of Mitigation Measures 14-1, requiring archaeological monitoring during grading activities, the Proposed Project would not cause a substantial adverse change in the significance of an archaeological resource.

During cemetery operations, preparation of burial sites would occur exclusively within previously excavated material, which has a low sensitivity for cultural resources. Prior mining operations removed substantial amounts of material, dramatically changing the topography on-site.

Additionally, the anticipated excavation for mass grading of the project site and installation of infrastructure would further modify the current on-site topography substantially. Mass grading activities during construction would include cuts ranging from 20 to 147 feet and fills ranging from 30 to 102 (as noted in Section 3.3). Between the prior mining activities and the proposed mass grading, the conditions on the entire site would be substantially altered and the potential for encountering in-situ or disturbed archaeological or tribal resources during operation of the cemeteries is considered negligible. Monitoring during excavation for burial sites would not be required since mass grading of the upper and lower pads during Project construction would be subject to Mitigation Measure 14-1, which would adequately address the possibility of encountering unknown archaeological and tribal cultural resources within the soil disturbed during these activities. Therefore, the conclusions of EIR No. 331 remain valid.

Would the project cause substantial adverse change in the significance of a historical resource as identified in §15064.5 of the CEQA Guidelines?
Approved Project
Less Than Significant Impact with Mitigation. EIR No. 331 indicated that no historical resources, as defined in Section 15064.5 of the CEQA Guidelines, have been identified within the project site, however, such resources exist in the immediate vicinity of the study area for the Approved Project.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-168
EIR No. 331 did identify the potential for unknown subsurface cultural deposits to be discovered during grading activities, which would be considered a potentially significant impact. Mitigation Measures 14-1 and 14-2 were incorporated into EIR No. 331 and with implementation of these measures, potential impacts to cultural resources were reduced to less than significant.

Proposed Project
Less Than Significant Impact with Mitigation. The Proposed Project would involve substantial grading within DA 5 to construct the pads for the proposed cemeteries and on-site roads and infrastructure similar to the proposed development anticipated in the Approved Project. As there were no historical resources identified within the previous EIR No. 331 nor with the 2024 Study. As mentioned previously, a record search (completed April 15, 2024) was conducted for the update and covered a 0.5 mile radius for the project site and resulted no recorded cultural resources within or adjacent to the project site. There have been five cultural resources recorded within 0.5 mile of the project site. With implementation of Mitigation Measures 14-1 and 14-2, there would be no substantial adverse change to any historical resources through the Proposed Project, and the conclusions of EIR No. 331 remain valid.

Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
Approved Project
Less Than Significant With Mitigation Incorporated. As stated earlier, no paleontological resources were identified within the Approved Project study area, however, the MPSP area, including DA 5, is known to contain several fossil-bearing geologic formations. In particular, the north-central project site area contains Sespe, Santiago, and Topanga Formations which have moderate to high potential to contain paleontological resources. As such, Mitigation Measure 14-3 was identified in EIR No. 331 to reduce potential impacts to paleontological resources to less than significant.

Proposed Project
Less Than Significant With Mitigation Incorporated. Similar to the Approved Project, the Proposed Project area is located on the north-central portion of the project site which has the potential to contain fossil-bearing geologic formations (Sespe, Santiago, and Topanga). Since the existing conditions of the Proposed Project area have not changed since the Approved Project, there is the potential to encounter paleontological resourced during grading activities within the project site and implementation of Mitigation Measure 14-3 applicable to the Proposed Project. As there are no known paleontological resources identified within the project site and with implementation of MM 14-3, potential impacts to paleontological resources would be same as identified for the Approved Project, and the conclusions of EIR No. 331 remain valid. 3-169
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

Would the project disturb any human remains, including those interred outside of formal cemeteries?
Approved Project
Less Than Significant With Mitigation Incorporated. As described above, no cultural resources, including formal cemeteries were identified in EIR No. 331. However, this ultimately does not preclude the possibility that individual burials may be discovered during grading or excavation activities. As such, Mitigation Measures 14-1 and 14-2, were identified to ensure a less than significant impact would occur to human remains.

Proposed Project
Less Than Significant With Mitigation Incorporated. As described above, no cultural resources were identified in EIR No. 331 or the 2024 Study for the project site. Historic-period aerial photographs of the project site were reviewed and indicate that, between 1952 and 1959, rock-quarrying operations appeared at the northwest corner of the project site. By 1980, these operations expanded to cover more of the project site and managed to cover a wider footprint of the project area by 2002. By 2005 and 2009, quarry operations appeared to have ceased during that period.

Based on the previous history of the project site, there are no known formal cemeteries within the Proposed Project area; however, even with the project’s level of disturbance there is still some minor potential for human remains to be discovered during grading or excavation activities to construct the Proposed Project. As such, MM 14-2 from EIR No. 331 would remain applicable to ensure a less than significant impact would occur to human remains. As the existing conditions of the project study area have not changed and with implementation of MM 14-2, the conclusions from EIR No. 331 remain valid.

Would the project conflict with any applicable plan, policy or regulation of an agency with jurisdiction over the project adopted for the purpose of avoiding or mitigating an environmental effect?
Approved Project
Less Than Significant Impact with Mitigation Incorporated. As described in EIR No. 331, there are no plans, policies, or regulations of the City of Anaheim related to the protection of cultural resources within the MPSP area. The project would remain consistent with the Southern California Association of Government’s Policy 3.21 related to the preservation and protection of recorded and unrecorded cultural resources and archaeological sites. The Approved Project would not result in significant impacts to any recorded resources and Mitigation Measures 14-1 through 14-3 would be implemented to ensure that any unknown and previously undocumented cultural resources are avoided.

Proposed Project
Less Than Significant With Mitigation Incorporated. Similar to the Approved Project, there are no plans, policies, or regulations of the City of Anaheim related to the protection of cultural resources on the project site and implementation of Mitigation Measures 14-1 and 14-2 would ensure that potential impacts to unknown cultural resources are addressed. The Proposed Project would not

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-170
result in significant impacts to any recorded resources and mitigation measures 14-1 through 14-3 from EIR No. 331 would remain applicable to ensure than any unknown and previously undocumented cultural resources are avoided and the conclusions of EIR No. 331 remain valid.

3.14.3 Cumulative Cultural Resources Impacts
Approved Project
Less Than Cumulatively Considerable Impact with Mitigation Incorporated. As analyzed in EIR No. 331, there would be no impact to any known cultural or paleontological resources. The project’s cumulative development in conjunction with past, present, and probably future projects would result in the disturbance of cultural resource sites throughout the region, the City and County would require mitigation of impacts to these resources. This includes the collection and preservation of artifacts, which may contribute to local and regional history and prehistory. As a result, the Approved Project would not have a significant cumulative impact on archaeological and paleontological resources or result in a significant cumulative loss of regional history or prehistory with the implementation of MM 14-1 through 14-3.

Proposed Project
Less Than Cumulatively Considerable Impact. As mentioned previously, the existing conditions in terms of the project site have not been changed since EIR No. 331 has been documented. The recent Cultural Study (2023) record search results and field survey indicated confirmed that no cultural resources were identified within the project site and that presence of cultural resources occurring the project site is deemed to be negligible. However, the Proposed Project has potential to result in disturbance of cultural resources throughout the Proposed Project area, and the City and County would require mitigation of impacts to these resources. Overall, the previous findings in EIR No. 331 remain valid, and the Proposed Project would not have a significant cumulative impact on archaeological and paleontological resources or result in a significant cumulative loss of regional history or prehistory with the implementation of MM 14-1 through 14-3.

3.14.4 Findings Related to Cultural Resources

3.14.4.1 No New Significant Effects Requiring Major Revisions to the Certified EIR Based on the foregoing analysis and information, there is no evidence that the Proposed Project requires a major change to EIR No. 331. The Proposed Project would not result in new significant environmental impacts related to cultural resources, and there would not be a substantial increase in the severity of impacts described in EIR No. 331.

3.14.4.2 No Substantial Change in Circumstances Requiring Major Revisions to the Certified EIR There are no substantial changes in circumstances requiring major revisions to EIR No. 331 as the Proposed Project would result in less overall development and construction impacts due to the nature of cemetery facilities. There is no information in the record or otherwise available that indicates a substantial change in circumstances pertaining to cultural resources, therefore, the findings in EIR No. 331 remain valid.
3-171
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

3.14.4.3 No New Information Showing Greater Significant Effects than the Certified EIR This Addendum has analyzed all available relevant information to determine whether there is new information that was not available at the time of EIR No. 331, indicating that a new significant effect not reported in that document may occur. Based on the information and analyses above, there is no substantial new information indicating that there would be a new significant impact related to cultural resources requiring major revisions to EIR No. 331.

3.14.4.4 No New Information Showing the Ability to Reduce Significant Effects in the Certified EIR There is no new information, mitigation, or alternatives to the Proposed Project that would substantially reduce one or more significant impacts pertaining to cultural resources identified and considered in EIR No. 331.

3.14.5 Standard Conditions and Mitigation Measures
While no Standard Conditions were identified under the Approved Project, Mitigation Measures (MM) 14-1 through 14-3 were identified to reduce potential impacts under the Approved Project to a less than significant level. MM 14-1 through 14-3 would remain applicable to the Proposed Project.

MM 14-1 Prior to the issuance approval of a grading plan or issuance of a building permit, whichever occurs first, the property owner/developer shall retain a County-certified archaeologist (project archaeologist) and submit written confirmation of this to the Department of Public Works/Planning and Building Division. The project archaeologist shall observe grading activities during project construction and recover, catalogue, analyze, and report archaeological resources as necessary in the previously undeveloped of-way) portions of the development area. The project archaeologist shall be present at the pre-grade conference. The project archaeologist shall submit to the Planning Department, and Department of Public Works, Development Service Division, a written plan with procedures for archaeological resource monitoring. For work within Caltrans right-of-way the plan shall be submitted for review by Caltrans Cultural Resources staff. This plan shall include procedures for temporarily halting or redirecting work to permit the sampling, identification and evaluation of the resources as appropriate, and a requirement that a Native American monitor retained by the property owner/developer be present during any required excavation. If the archaeological resources are found to be significant, the project archaeologist shall determine appropriate actions-in cooperation with the City of Anaheim or Caltrans, if within Caltrans right-of-way-for exploration and/or data recovery to adequately recover the scientifically significant information from or about the archeological resource.

The project archaeologists shall prepare any excavated material to the point of identification. Following the completion of grading associated with project construction, the archaeologists shall prepare a report detailing the results of the monitoring program to be presented to the City of Anaheim Planning Department.

The report shall follow guidelines of the California Office of Historic Preservation

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-172
(1990). Excavated finds shall be accessioned into a qualified scientific institution that meets, or exceeds, the requirements of 36CFR79.

MM 14-2 If human remains are encountered during the conduct of ground-disturbing activities, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition of the materials pursuant to Public Resources Code Section 5097.98.

The County Coroner must be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner would notify the Native American Heritage Commission (NAHC). The NAHC would determine and notify a Most Likely Descendent (MLD). The MLD may inspect the site of the discovery with the permission of the property owner/developer or his/her authorized representative.

The descendent must complete the inspection within 24 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials.

MM 14-3 Prior to issuance of the first grading permit, the property owner/developer shall submit a monitoring plan, prepared by an Orange County certified paleontologist to the Department of Public Works, Development Services Division/Planning & Building Department that ensures that the following actions are implemented:
a. The area west of Gypsum Canyon is comprised almost entirely of the Topanga Formation (high paleontological sensitivity) and contains all of the heretofore recognized surface occurrences of fossils on the project site. The north-central portion of the project site is comprised chiefly of the interbedded undifferentiated Vaqueros and Sespe Formations (moderate to high paleontological sensitivity) and smaller elements of the Sespe, Santiago, and Topanga Formations (all high paleontological sensitivity). Paleontological monitoring in the western and north-central areas of the project site shall be conducted on a full-time basis and shall be identified as such in the monitoring plan. It shall be the responsibility of the project paleontologist to show, to the satisfaction of the City, the recommended limits of full-time monitoring on the tentative tract or parcel map level grading plans, when available. Because of the potential for identifying microfossils or small fragments of macrofossils, periodic screening of sediments from cuts in these formations shall be carried out by the project paleontologist. Such material may be removed in bulk and screened off- site to minimize interference with grading operations.
b. The Holz Shale, Schulz Ranch Member of the Williams Formation, the Silverado Formation, Santiago Formation, and the Sespe Formation, exposed primary east of Gypsum Canyon, shall be monitored as determined necessary by the project paleontologist during grading operations. Recommended hours for monitoring activities shall be established by the project paleontologist and shall be outlined in the monitoring plan. It shall be the responsibility of the project paleontologist to demonstrate, to the satisfaction of the City, the appropriate level of monitoring necessary based on the tentative tract or parcel map level grading 3-173
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

plans, when available. Because of the potential for identifying microfossils or small fragments of macrofossils, periodic screening of sands from cuts in these units shall be done by the project paleontologist monitor. Such material may be removed in bulk and screened off-site to minimized interference with grading operations.
c. Any paleontological work at the site shall be conducted under the direction of a County of Orange Certified paleontologist (project paleontologist). d. If a fossil discovery occurs during grading operations when the project paleontologist is not present, grading shall be diverted around the area until the monitor can survey the area, and or Caltrans Cultural resources staff can inspect the site, if the resources are to be found within Caltrans right-of-way. e. Any fossils recovered during the development, along with their contextual stratigraphic data, shall be donated to the County of Orange, or other appropriate institution with an educational and research interest in the materials. A final report detailing findings and disposition of specimens shall be prepared by the project paleontologist and submitted to the City of Anaheim Planning & Building Department upon completion of grading.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

3-174
This page intentionally left blank
4-1
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

4.0 REFERENCES
City of Anaheim. 2004a. General Plan Land Use Element. May. _____. 2004b. City of Anaheim General Plan Circulation Element. May. Website:
https://www.anaheim.net/DocumentCenter/View/9520/D-0-Circulation-Element?bidId= (accessed April 3, 2024).
_____. 2005a. Mountain Park Specific Plan Amendment Final Environmental Impact Report No. 331.

July.
_____. 2005b. Mountain Park Specific Plan No. 90-4 Amendment No. 1. August 24. _____. 2023. Draft Housing Element. 6th Cycle: 2021-2029. April. Website: https://www.anaheim.net/ 5848/2021-2029-Housing-Element-Update (accessed December 10, 2023). _____. Anaheim Municipal Code. Title 18: Zoning.

California Air Resources Board (CARB). iADAM: Air Quality Data Statistics. Website:
https://www.arb.ca.gov/adam/trends/trends1.php (accessed April 23, 2024).

Denise Duffy & Associates, Inc. 2019. Draft Environmental Impact Report/Environmental Assessment California Central Coast Veterans Cemetery. April.

GMU Engineers & Geologists. 2023. Final Preliminary Report of Geotechnical Studies and Review of Preliminary Grading Plan for Tentative Parcel Map 2022-160, Gypsum Canyon Cemetery Site, City of Anaheim, California. June 12.

Huitt Zollars. 2023a. Public and Proposed Veterans Cemetery at Gypsum Canyon. County of Orange/Santa Ana Region Priority Project Preliminary Water Quality Management Plan (WQMP). Prepared for the Orange County Cemetery District. October.

Huitt Zollars. 2024. Preliminary Water Study for Gypsum Canyon Cemetery. February 9. ______. 2023b. Public and Proposed Veterans Cemetery at Gypsum Canyon. Preliminary Drainage Report. Prepared for the Orange County Cemetery District. October.

LSA Associates, Inc. 2024a. Gypsum Canyon Cemeteries—Vehicle Miles Traveled Analysis. April. ______. 2024b. Cultural Resources Study Update for Proposed Mountain Park Memorial Park in Anaheim, Orange County, California. May.
______. 2024c. Gypsum Canyon Cemeteries—Parking Demand Study. May. ______. 2024d. Gypsum Canyon Cemeteries. Traffic Impact Analysis. May.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

4-2
______. 2024e. Gypsum Canyon Cemetery Project. Biological Resources Assessment. May.

Ninyo & Moore. 2023. Proposed Gypsum Canyon Cemetery and 1.5-mile 20-inch Water Line 9010 East Santa Ana Canyon Road. Phase I Environmental Site Assessment. December 20.

Santa Ana Regional Water Quality Control Board (RWQCB). California 2020-2022 Integrated Report (303(d) List/305(b) Report). Appendix A; Proposed Final 2020-2022 303(d) List. ______. 1995. Santa Ana River Basin Plan, Chapter 3 – Beneficial Uses, Table 3-1. January 24.

South Coast Air Quality Management District. 2022. 2022 Air Quality Management Plan. Website:
https://www.aqmd.gov/home/air-quality/air-quality-management-plans/air-quality-mgt- plan (accessed April 23, 2024).

United States Census Bureau. 2022a. QuickFacts Orange County, California. Website:
https://www.census.gov/quickfacts/fact/table/orangecountycalifornia/PST045222 (accessed December 10, 2023).
______. 2022b. QuickFacts Orange County, California. Website: https://www.census. gov/ quickfacts/fact/table/orangecountycalifornia/PST045222 (accessed December 10, 2023).

A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

APPENDIX A

MITIGATION MONITORING AND REPORTING PROGRAM NO. 137

MITIGATION MONITORING PROGRAM NO. 137

FOR THE MOUNTAIN PARK
SPECIFIC PLAN NO. 90-4, AMENDMENT NO. 1
CEQA Action: Environmental Impact Report No. 331
Project Description: The Mountain Park Specific Plan (SP 90-4) currently allows for the development of 7,966 residential units, commercial uses, interim sand and gravel mineral extraction, schools, parks and open space. The project applicant, The Irvine Community Development Company, proposes to amend the Mountain Park Specific Plan to reduce the number of residential units to a maximum of 2,500 and to provide for the following: a City fire station; a school site and adjacent public community park; public and private recreational facilities, including riding and hiking trails and a trail staging area; an interpretive center and store concession; and roadways and utilities necessary to serve the proposed development. Approximately 2, 163 acres of open space would be preserved as part of the project. Additionally, the proposed project includes the construction of the State Route 241 (SR-241 )/Weir Canyon Road interchange, and a bridge over SR-241 connecting development areas east and west of SR-241.

The primary actions associated with the project include a proposed amendment to the Mountain Park Specific Plan to implement the adopted City of Anaheim General Plan, and a proposed amendment to the City of Anaheim Zoning Code to incorporate revised Zoning and Development Standards for the Mountain Park Specific Plan area. Also proposed is an amendment to the General Plan Safety Element, Fire Protection Areas (Figure S-5) to remove proposed development areas from the Very High Fire Hazard Severity Zone designation.

Project Location: The proposed project site is located generally in Gypsum Canyon, south of the Riverside (SR-91) Freeway, in Orange County, California.

The majority of the project site is in the jurisdiction of the City of Anaheim; however, open space areas in the southern- and eastern-most portions of the project site are in unincorporated County of Orange jurisdiction in the City of Anaheim's sphere-of-influence. SR-91 is immediately north of the project site, and the SR-241 bisects the site into eastern and western segments.

Terms and Definitions:

1. Property Owner/Developer - Any owner or developer of real property within the boundaries of the Mountain Park Specific Plan area.

2. Environmental Equivalent/Timing - Any Mitigation Measure and timing thereof, subject to the approval of the City of Anaheim, which will have the same or superior result and will have the same or superior effect on the environment. The Planning Department, in conjunction with any appropriate agencies or City departments, shall determine the adequacy of any proposed "environmental equivalent/timing" and, if determined necessary, may refer said determination to the Planning Commission. Any cost associated with the information required in order to make a determination of environmental equivalency/timing shall be borne by the property owner/developer. Staff time for reviews will be charged on a time and materials basis at the rate in the City of Anaheim's adopted fee schedule.

3. Timing - This is the point where a mitigation measure must be monitored for compliance. In the case where multiple action items are indicated, it is the first point where compliance associated with the mitigation measure must be monitored. Once the initial action item has been complied with, no additional monitoring pursuant to the Mitigation Monitoring Program will occur, as routine City practices and procedures will ensure that the intent of the Mitigation Monitoring Program No. 137
- .... - - - - a; - - - ...... -- --- - -
measure has been complied with. For example, if the timing is "to be shown on approved building plans" subsequent to issuance of the building permit consistent with the approved plans will be final building and zoning inspections pursuant to the building permit to ensure compliance.

4. Responsibility of Monitoring - Shall mean that compliance with the subject mitigation measure(s) shall be reviewed and determined adequate by all departments listed for each mitigation measure.

5. Ongoing Mitigation Measures - The mitigation measures that are designated to occur on an ongoing basis as part of this mitigation monitoring program will be monitored in the form of an annual letter from the property owner/developer in January of each year stating how compliance with the subject measures(s) has been achieved. When compliance with a measure has been demonstrated for a period of one year, monitoring of the measure will be deemed to be satisfied and no further monitoring will occur. For measures that are to be monitored "Ongoing During Construction", the annual letter will review those measures only while construction is occurring; monitoring will be discontinued after construction is completed.

SECTION 4.2 - AESTHETICS
Existing Regulations & Standard Conditions
Prior to approval of grading plans. SC 2-1
Prior to approval of precise grading plans. SC2-2
Prior to approval of grading plans. SC2-3
Prior to approval of street improvement plans SC 2-4
for a development area.

Mitigation Monitoring Program No. 137
Prior to approval of grading plans, the property owner/developer shall provide Department of Public grading plans to the Department of Public Works demonstrating that graded Works areas will be compatible with natural landform characteristics in conformance with the Anaheim Municipal Code, Title 17-Land Development and Resources, the City of Anaheim Grading Design Manual and Hillside Grading Procedures, the Mountain Park Specific Plan Grading Concept and Hillside Grading and Landscape Policies, and the most recent version of the Anaheim Building Code (ABC).

Prior to approval of precise grading plans, the property owner/developer shall Department of Public prepare a detailed slope landscape plan, which shall be approved by the Works Department of Public Works. The plan shall be certified by a licensed landscape architect, and be prepared in compliance with Section 17.06 of the City of Anaheim Municipal Code and the Mountain Park Specific Plan Grading Concept and Hillside Grading and Landscape Policies to blend landscape features with the existing environment. In addition, the landscape plan shall conform to the preliminary landscape plan approved in conjunction with the development area plans.

Tree replacement shall be conducted consistent with Section 18.18.040. Prior Planning Department to approval of grading plans, the property owner/developer shall provide a Specimen Tree Removal Plan to the Planning Department demonstrating that the proposed project has been designed in accordance with the provisions of Chapter 18.18.040 and required tree replacement.

Prior to approval of street improvement plans for a development area; the Public Utilities property owner/developer shall submit a detailed lighting plan for review and Department approval by the Public Utilities Department. The plan shall be reviewed for compliance with adopted City standards.
2 Prior to the issuance of an Encroachment
Permit by Caltrans.

Prior to the issuance of an Encroachment
Permit by Caltrans.

Project Design Features
In conjunction with the submittal of each
tentative or parcel map.

Prior to approval of the Park Master Plan for
the sports park within Development Area 3.

Mitigation Monitoring Program No. 137
SC2-5
SC2-6
PDF 2-1
PDF 2-2
Responsible for \· . · • , ' ···· "" · ·
: · .:Mon1tonttt1 . }d&tr\;ti~t,JH\'
Prior to the issuance of an Encroachment Permit by Caltrans, the property City of Anaheim owner/developer shall submit grading plans to Caltrans demonstrating that Planning Department, graded areas are in conformance with Caltrans standard specifications. and Prior to the issuance of an Encroachment Permit by Caltrans, the property owner/developer shall submit landscape plans for areas within Caltrans right­ of-way to Caltrans for review and approval, demonstrating that the proposed plant palette is in conformance with Caltrans requirements, including Executive Order 13112, Invasive Species. Proof of this approval shall be submitted to the City of Anaheim Department of Public Works.

The Mountain Park Specific Plan provides for replacement of oak, sycamore, willow and other native trees removed as a result of the project at a ratio of 20:1. In conjunction with the submittal of each tentative tract or parcel map, the property owner/developer shall submit a Detailed Landscape Plan to the Planning Department demonstrating that trees removed from the site will be replaced at a total ratio of 20:1. The 20:1 ratio is achieved using a combination of the Scenic Corridor Overlay tree list (Anaheim Zoning Code Chapter 18.18, Table 18-B}, and the Mountain Park Specific Plan Tree List.

Prior to approval of the Park Master Plan for the sports park within Development Area 3, the property owner/developer shall submit lighting plans for review and approval by the Community Services Department that incorporate the following design specifications:
• Sports field luminaries shall have mounting hardware approved by the City, which cannot be inadvertently or intentionally adjusted to cause spillover impacts. Instead, luminaries shall be professionally and permanently installed to direct light only onto the sports fields/courts and away from residential areas and other development.
• Luminaries lamps shall provide good color rendering and natural light qualities.
• Luminaries shall be restricted to no more than 500 lux (1 lumen per square meter) or 50 foot-candles per fixture.
• Luminaries shall be placed at the appropriate, engineered height to reduce potential for glare and incidental spillover into adjacent properties and open space.
• Luminaries mountings, poles, and fixtures shall have matted finishes. 3 Caltrans (for areas
within Caltrans right­
of-way)
City of Anaheim
Department of Public
Works, and
Caltrans (for areas
within Caltrans right­
of-way
Planning Department
Community Services
Department
SECTION 4.3 - GEOLOGY AND SOILS
Existing Regulations & Standard Conditions
Prior to issuance of each building permit. SC 3-1
Prior to issuance of building permits. SC 3-2
Prior to approval of each mass grading plan. SC 3-3
Prior to issuance of each building permit, the property owner/developer shall Chief Building Official demonstrate that each structure has been designed in accordance with the most recent seismic standards in the ABC (Anaheim Building Code) and approved by the Chief Building Official. The ABC contains provisions that regulate the design and construction of excavations, foundations, retaining walls and other building elements to control the effects of seismic ground shaking and adverse soil conditions.

Prior to issuance of building permits, the property owner/developer shall submit Department of Public building pad certifications to the Department of Public Works, as required in Works Code Section 17.06, documenting that grading has been completed in conformance with the Anaheim Municipal Code, Title 17-Land Development and Resources, the City of Anaheim Grading Design Manual and Grading Plan Procedures, and the Mountain Park Specific Plan Grading Concept and Hillside Grading and Landscape Policies.

In compliance with the Anaheim Municipal Code, prior to approval of each Department of Public mass grading plan, the property owner/developer shall submit a preliminary Works, and geotechnical report prepared by an engineering geologist and geotechnical engineer to the Department of Public Works for review and approval. This Cattrans (for grading report shall be prepared to the satisfaction of the City Engineer and shall within Caltrans right­ address soil and geology related constraints and hazards identified in EIR of-way) No. 331 such as slope stability, settlement, liquefaction, and related secondary seismic hazards. For grading within Caltrans right-of-way, a preliminary geotechnical report in compliance with Caltrans regulations shall be submitted and approved by Caltrans. Specifically, the report shall:
• Include an assessment of potential soil related constraints such as stability of proposed cut, fill and natural slopes. Conduct further subsurface exploration to refine geologic structure for cut slope stability. If the report finds stabilization necessary, grading plans shall require corrective measures to address the need for stabilization;
• Include an assessment of on-site landslides and appropriate corrective measures, such as further subsurface exploration of landslide areas beneath planned fills and development areas. Corrective measures would include complete removal, if feasible or stabilization or buttressing of the landslide. This would involve partial removal of the landslide and stabilizing potential future movement with earthen fill or reinforced materials;
• Include subsurface exploration of alluvial and canyon drainage areas beneath planned fills or development areas;
• Evaluate excavation characteristics of on-site earth materials; Mitigation Monitoring Program No. 137 4
• Include subsurface exploration to refine geologic structure for cut slope stability;
• Establish specific remedial grading requirements, including but not limited to establishing parameters for stabilization/buttressing of slopes, removal of unstable soil materials;
• Provide grading, foundation, and structural design recommendations based on findings of future geotechnical investigations; • Address settlement, liquefaction, and structural design recommendations.

Grading plans shall incorporate removal, where feasible, of all potentially liquefiable alluvium. The grading plans shall also incorporate placement of engineered fill in the canyons and installation of a subdrain system; • Address the potential for expansive soils. Representative soil samples of near-surface soil material shall be collected and tested for expansion potential after the completion of rough grading on-site. Expansive soils that are detrimental to the project shall be subject to special building/foundation design, deepened foundations, post-tension foundations, soil removal, selective grading to blend highly expansive soils with soils of low expansivity, moisture conditioning, or other corrective measures as recommended by a licensed soils/geotechnical engineer and approved by the City Engineer prior to approval of each grading plan; • Include an evaluation of potentially corrosive soils and recommend appropriate corrective measures. If corrosive soils are found, corrective measures shall be incorporated into the grading plans;
• Address collapsible/compressible material. This material shall be subject to removal or other corrective measures in all areas planned for structural fill. Topsoil, colluvium, alluvium, highly weathered bedrock, and landslide materials with settlement potential shall be subject to corrective measures such as removal and recompaction, surcharging, settlement monitoring, and/or other measures deemed appropriate by the geotechnical engineer of record and approved by the City Engineer prior to approval of each grading plan;
• Include appropriate laboratory testing to define soil engineering parameters;
• Include additional refraction lines to better ascertain rock hardness and rippability for specific planned cut areas;
• Include a review of seismic and faulting conditions on-site. Seismic design parameters identified for the project shall be incorporated into project design as applicable. Caltrans seismic design criteria for the proposed overcrossings shall be incorporated into overcrossing design and implementation; and,
• Corrective work within Caltrans right-of-way shall be done in accordance with Caltrans standard specifications.

Mitigation Monitoring Program No. 137 5
.. ..
.· Timing
Mitigation Measures
Prior to the approval of each rough grading
plan.

Prior to the approval of each grading plan.

Prior to the commencement of any blasting
activities.

Mitigation Monitoring Program No. 137
MM3-1
MM3-2
MM3-3
.. .., .. - .. {lllli .. - - ..
: ··••· Respohiiblt;;ror,:\ . ··. •··· /MdhltoHfi'g•:y; Prior to the approval of each rough grading plan, the property owner/developer Department of Public shall submit a site specific geotechnical report prepared by a civil engineer Works based on recommendations of the preliminary geotechnical reports required under SC 3-3 to the Department of Public Works for review and approval. Site- specific geotechnical studies shall provide specific feasible recommendations for soils engineering, appropriate drains and subdrains in each Development Area, and address the potential for artesian conditions in Development Areas 1 and 2. As part of addressing the potential affects of groundwater on slope stability during future site specific investigations, the property owner/developer shall obtain and provide data from piezometers installed through the alluvium of Gypsum Canyon into the underlying bedrock, near proposed toe of slopes.

The piezometers should be monitored for a period of one year to evaluate the potential artesian conditions with consideration for seasonal fluctuations in groundwater elevations.

Prior to the approval of each grading plan, a note shall be added to the grading Department of Public plan requiring that during grading operations, all grading and earthwork shall Works be performed under the observation of a registered geotechnical engineer in order to achieve proper sub-grade preparation, selection of satisfactory materials, and placement and compaction of all structural fill. An engineering geologist shall map cut slopes during grading to identify any laterally continuous, adversely oriented, broken or fractured zones that may reduce slope stability. The note shall be prepared to the satisfaction of the Department of Public Works.

Prior to the commencement of any blasting activities, the property owner/ Planning Department developer shall submit a blasting plan prepared by a qualified blasting specialist to the Fire Department and Department of Public Works for review and approval. A blasting permit shall be obtained from the Fire Department. A copy of the approved blasting plan shall be submitted to the Planning Department. The property owner/developer shall be responsible for all costs associated with the preparation of the blasting plan to the satisfaction of the Fire Department. The blasting plan shall be prepared in accordance with the United States Department of Interior, Office of Surface Mining (USOSM) standards and shall include, but not be limited to the following:
a.
b.

C.

Pre-blast survey
Site and location of planned blasting and hours of operation (blasting to be conducted during the daylight hours only)
Notification of blasting activities to all property owners within one-half mile of the blasting area, which may include {depending on location of blasting) private residents, Caltrans, the County of Orange, the City of Yorba Linda and any other persons/agencies determined appropriate by the Fire Department. This notification shall describe expected period and frequency that the blasting shall occur and give a contact phone number for any questions or complaints. All complaints shall be responded to in a method deemed satisfactory to the City of Anaheim Planning Director.
6 -
- -
· Timing.
d.
e.
f.
g.
h.
i.
j.
k.

I.
m.
n.
.. -
Types and amounts of explosives
Warning system information
Methods of transportation and handling of explosives
Minimum acceptable weather conditions
Procedures for handling, setting, wiring and firing explosives Procedures for clearing and controlling access to blast danger Procedures for handling misfires and other unusual occurrences Emergency action plan
Material safety data sheet for all explosives or other hazardous materials expected to be used.

Compliance with local, state and federal laws
Measures to assess, control, and monitor noise and ground vibration from blasting, including:
• The project contractor shall use current state-of-the-art technology to keep blast-related vibration and air blast at off-site residential and other occupied structures as low as possible, consistent with blasting safety. In no instance shall blast vibration or air blast, measured on the ground adjacent to a residential or other occupied structure, be allowed to exceed the frequency dependent limits contained in the USOSM regulations.
• The project contractor shall use a blasting seismograph to monitor and record air blast and vibration for blasts within 1,000 feet of residences and other occupied structures to verify that measured levels are within the recommended limits (as determined under the USOSM regulations) at those locations. If blasting is found to exceed specified levels, blasting shall cease, and alternative blasting or excavation methods that result in the specified levels not being exceeded shall be employed.
• Air blast and vibration monitoring shall take place at the nearest off­ site residential or other occupied structure. If vibration levels are expected to be lower than those required to trigger the seismograph at that location, or if permission cannot be obtained to record at that location, recording shall be accomplished at some closer site in line with the structure. Specific locations and distances where air blast and vibration are measured shall be documented in detail along with measured air blast and vibration amplitudes.

Mitigation Monitoring Program No. 137 7
.. -
Timing
SECTION 4.4 - HYDROLOGY
Project Design Features
Prior to approval of the first mass grading
plan.

PDF 4-1
.. -
The Mountain Park Specific Plan includes a Proposed Drainage System Plan (refer to Exhibit 3-9 of the Draft EIR included in Attachment A). Prior to approval of the first mass grading plan, the property owner/developer shall submit a Drainage and Runoff Management Plan (RMP) to the Department of Public Works for review and approval. The RMP shall demonstrate substantial conformance with the Proposed Drainage System included in the Mountain Park Specific Plan. The Drainage and Runoff Management Plan shall include the approximate timing for construction of the following drainage facilities:
a. Gypsum Canyon Road/SR-91 Box Culvert Modification: A 1,500 linear foot culvert modification will be constructed at the downstream end of Gypsum Canyon to address existing deficiencies and accommodate proposed peak flows from the project site. The proposed storm drain improvement plan will extend the Gypsum Canyon Road/SR-91 box culvert inlet structure approximately 1,500 feet upstream following the existing alignment of the Gypsum Canyon Creek. At this location, the proposed Gypsum Canyon Road will be designed to serve as an impoundment to retain storm water runoff up to approximately 17 feet, which produces sufficient hydraulic head to convey 5,500 cfs through the culvert into Featherly Park. The elevation difference between the flow line of the culvert inlet and the top of the road is expected to be approximately 20 feet, allowing for a freeboard of three feet. The extension of the culvert upstream, with the described design modifications to the inlet control, will prevent flooding onto Gypsum Canyon Road during large storm events.

The proposed modification of the culvert will improve the flood control design capacity of the culvert from a 10-year storm event to a 100-year storm event. A confirmation of the structural integrity and design calculations of the existing culvert structure shall be completed prior to final design of the new box culvert extension.
b. West Drainage Area Storm Drain Improvement: Minor storm drain improvements to an existing undersized 36-inch reinforced concrete pipe (RCP) that collects off-site runoff from the undisturbed slopes draining into The Summit will be upsized to the capacity of a 54-inch RCP for proper conveyance of the project flows into the existing 66-inch RCP. c. SR-91/Gypsum Canyon Road Storm Drain Improvement: A minor storm drain improvement will be implemented for the 4-acre sub-area that used to drain into the existing culvert inlet but will not adequately drain after the culvert extension. The improvement will consist of a riser tower and a RCP (size to be determined) to collect the flows and connect directly into the triple box culvert at the approximate location of the existing culvert inlet.

Mitigation Monitoring Program No. 137 8
- - ..
- .. - ..

Timing
Prior to issuance of an Encroachment
Permit by Caltrans.

Mitigation Monitoring Program No. 137
PDF 4-2
d.
e.
-
Featherly Regional Park Channel Improvements: The improvements to the box culvert outlet for energy dissipation of flood flows will include a concrete apron followed by riprap to reduce velocities down to the 10 to 12 feet per second (fps) range. Riprap will also be added to the embankments beyond the concrete apron. To provide additional stabilization of the channel downstream, flow velocities will be decreased to the range of 10 to 12 fps where turf-reinforced mesh blankets will be used, and vegetation re-established along the channel bottom and embankments. Turf-reinforced blankets (or equivalent alternatives) will continue along the embankment up to a maximum of 340 feet beyond the riprap leading up to the existing road crossing. Prior to approval of a grading permit, the property owner/developer shall provide evidence to the Department of Public Works that the design and construction of these improvements have been approved by the County of Orange Harbors, Beaches and Parks Department.

Outlet Points to Natural Channels: Energy dissipation/velocity reduction devices will be employed to ensure flows are released at non- erosive velocities. Such devices may include: riprap, geotextiles, granule filters, fills, grade control structures and/or check dams, or equivalent measures.
f. Vegetated f/oodwa/1 for Community Center: As part of final design, a vegetated floodwall would be incorporated into the portion of the slope downstream of the community center as necessary to satisfy flood control requirements.

Department of Public
Works
The Mountain Park Specific Plan includes a Proposed Drainage System Plan City of Anaheim (refer to Exhibit 3-9 of the Draft EIR included in Attachment A), which includes Planning Department, drainage improvements within Caltrans right-of-way. Prior to issuance of an and Encroachment Permit, the property owner/developer shall submit a Drainage Plan to Caltrans for review and approval. The Drainage Plan shall demonstrate Caltrans (for areas substantial conformance with the Proposed Drainage System included in the within Caltrans right­ Mountain Park Specific Plan. The Drainage Plan shall include the approximate of-way) timing for construction of the following drainage facilities:
• SR-241 Drainage Improvements: The improvements along the SR-241 include the abandonment of the existing 72-inch corrugated steel pipe (CSP) in lieu of a 54-inch RCP, the modification of the 42- inch CSP outlet structure, the modification of several smaller drainage systems draining into the proposed 54-inch RCP and 42-inch CSP and the implementation of five Caltrans swales within the Caltrans right-of-way.
9 - ........... ..

SECTION 4.5 -WATER QUALITY
Existing Regulations & Standard Conditions
Prior to approval of each mass or rough SC 5-1
grading plan.

Prior to the approval of grading plans.

Prior to approval of a grading plan.

Prior to issuance of an Encroachment
Permit by Caltrans.

Prior to issuance of an Encroachment
Permit by Caltrans.

Mitigation Monitoring Program No. 137
SC 5-2
SC5-3
SC5-4
SC5-5
Prior to approval of each mass or rough grading plan, the property Department of Public owner/developer shall submit a project water quality management plan Works (WQMP) to the Department of Public Works for review and approval. The WQMP shall demonstrate compliance with the implementation plans under the MS4 Permit, namely the Drainage Area Management Plan/Local Implementation Plan (DAMP/LIP}.

Prior to the approval of grading plans, the property owner/developer shall Department of Public provide written evidence to the Department of Public Works that it has filed a Works Notice of Intent with the Regional Water Quality Control Board in order to obtain coverage under the Construction General Permit (CGP) (NPDES No.

CAS000002, Resolution No. 2001-046, or the latest approved CGP). Pursuant to the permit requirements, the property owner/developer shall develop a Stormwater Pollution Prevention Plan (SWPPP) that incorporates Best Management Practices for reducing or eliminating construction related pollutants in the site runoff.

Prior to approval of a grading plan, the Department of Public Works shall verify Department of Public that the General Waste Discharge Requirements issued by the Santa Ana Works Regional Water Quality Control Board (RWQCB) Order No. RS-2003-0061, and NPDES No. CAG998001 (or latest approved equivalent) are in effect and shall govern discharges from construction dewatering and water line/sprinkler line testing should they occur during construction. The property owner/developer shall comply with these regulations including provisions requiring notification, testing and reporting of dewatering and testing-related discharges, which shall mitigate any impacts of such discharges.

Prior to issuance of an Encroachment Permit by Caltrans for construction City of Anaheim · within Caltrans right-of-way, the property owner/developer shall prepare a Planning Department, Water Pollution Control Program (WPCP) or Storm Water Pollution Prevention and Plan (SWPPP), as required, in conformance with Caltrans Standard Plans and Standard Specifications for Water Pollution Control. The property Caltrans (for areas owner/developer shall provide Caltrans Permits Branch with a copy of the within Caltrans right­ WPCP or SWPPP, including BMPs to be implemented for construction of-way) activities, as required by the NPDES Statewide Storm Water Permit for General Construction activities.

Prior to issuance of an Encroachment Permit by Caltrans for construction City of Anaheim within Caltrans right-of-way, a note shall be added to the grading plan requiring Planning Department, that any construction activities within Caltrans right-of-way shall be in and compliance with the requirements of the Caltrans Statewide NPDES Storm Water Permit, Order No. 99-06-DWQ, NPDES No. CAS000003, in addition to Caltrans (for areas the BMPs specified in the Caltrans Storm Water Management Plan. When within Caltrans right­ applicable, the property owner/developer shall also conform to the of-way) requirements of the General NPDES Permit for Construction Activities, Order No. 99-08-DWQ, NPDES No. CAS 000002, and any subsequent General Permit in effect at the time of issuance of an Encroachment Permit. 10 -
- - .. -
· .. Timing
Project Design Features
Prior to approval of each mass or rough
grading plan.

PDF 5-1
- - .. ..... , .. -
~espor,~!!:>!e _for: ; :
·· 'M6nif<>Hntf:/'.)\; -'&tiirit",i~tf
In furtherance of the Orange County Drainage Area Management Plan/City of Department of Public Anaheim Local Implementation Plan (DAMP/LIP) requirements, the Mountain Works Park Specific Plan includes the following project design features that shall be incorporated into the final project Water Quality Management Plan (WQMP).

These design features meet or exceed the requirements of the DAMP/LIP.

Prior to approval of each mass or rough grading plan, the property owner/developer shall submit the Final WQMP to the Department of Public Works incorporating the following measures:
a. Site Design BMPs: The following site design BMPs are practices designed to minimize runoff and the introduction of pollutants in storm water runoff.

Minimize Impervious Area and Impervious Areas Directly Connected to Storm Drains
• Minimize impervious areas by incorporating landscaped areas over substantial portions of the project area consistent with the Development Plan and Concept Landscape Plans. Single family residential landscape areas shall be determined by zoning development standards, including setbacks, lot coverage, street parkway standards, and design objectives;
• Minimize directly connected impervious area by draining parking lots to landscaped areas or bioretention facilities to promote filtration and infiltration of storm water, if landscaping slopes are less than 2 percent and the project is not adjacent to steep slopes; • Utilize vegetated areas, e.g., setbacks, swales, end islands, and median strips, for biofiltration and bioretention of nuisance and storm runoff flows from parking lots and other impervious areas; and • Design sidewalks to drain into landscaping and swales prior to discharging to the storm water conveyance system.

Selection of Construction Materials and Design Practices • Select building material for roof gutters and downspouts that do not include copper or zinc; and
• Construct streets, sidewalks, and parking lot aisles to the minimum widths specified in the Anaheim Municipal Code or adopted Specific Plan and in compliance with the Development Plan and regulations for the Americans with Disabilities Act and safety requirements for fire and emergency vehicle access. Incorporate landscaped buffer areas between sidewalks and streets in compliance with the Development Plan and Anaheim Municipal Code.

Mitigation Monitoring Program No. 137 11
- .. - - - ..
.Timing
.. - - .. ·- - ..... -
Conserve Natural Areas
• Preserve existing riparian areas along Gypsum Canyon Creek and protect with buffer zones per the Development Plan;
• Preserve 2,163 acres of open space within the project boundary outside of the development area, including NCCP open space areas, open space devoted to conservation easements, and other open space;
• Concentrate or cluster development on the least environmentally sensitive portions of the project site (e.g., the quarry site) while leaving the remaining land in a natural, undisturbed condition; Non-Structural Source Control BMPs
N1 Education for property owners, tenants and occupants - practical information materials shall be provided to the first residents/occupants/ tenants on general housekeeping practices that contribute to the protection of storm water quality. The Homeowner's Association (HOA) shall have an ongoing educational material distribution program. At a minimum, these materials shall cover the following topics:

1. The use of chemicals (including household type) that should be limited to the property, and avoidance of disch13rge of specified wastes via hosing or other means to gutters, catch basins, and storm drains.

2. The proper importance of appropriate irrigation techniques and proper handling/application of material such as fertilizers, herbicides, pesticides, cleaning solutions, paint products, automotive products, and swimming pool chemicals, and
swimming pool drainage.
• Use natural drainage systems to the maximum extent practicable or create drainages (e.g., vegetated swales) that mimic natural conveyances and allow for storm water infiltration as well as pollutant removal; and
• Maximize canopy interception and water conservation by preserving existing native trees and shrubs in natural open space areas outside of the development area, incorporating new trees into project design pursuant to landscape and reforestation plan, and including native or drought resistant plants in development plant palettes.

Protect Slopes and Channels
• Protect slopes: minimize erosion potential with vegetative cover, route flows safely away from steep and/or sensitive slopes, stabilize disturbed slopes; and
Mitigation Monitoring Program No. 137 12
.. ... -
- - .. .. - -
Tiriling
Mitigation Monitoring Program No. 137
- - - - - - - ..... -
• Protect channels: control and treat flows in landscaping and/or other controls prior to reaching existing natural drainage systems, stabilize channel crossings, ensure that increases in runoff velocity and frequency caused by the project do not erode the channel, install energy dissipaters, such as riprap, at the outlets of storm drains or conveyances.
b. Source Control BMPs: The following source control BMPs shall be implemented in order to minimize the amount of pollutants in dry weather (nuisance) flows and in storm water runoff from the project.

3. The environmental and legal impacts of illegal dumping of harmful substances into storm drains and sewers.

4. Alternative household products that are safer to the environment.

5. Household hazardous waste collection programs.

6. Used oil-recycling programs.

7. Proper procedures for spill prevention and clean up.

8. Proper storage of materials that pose pollution risks to local waters.

9. Carpooling programs and public transportation alternatives to driving.

N2 Activity restrictions (Conditions, Covenants, and Restrictions) - Conditions, Covenants, and Restrictions (CC&Rs) shall be prepared as necessary and shall address surface water quality protection, or, alternatively, use restrictions shall be developed through lease terms.

N3 Common area landscape management - ongoing maintenance shall be consistent with City of Anaheim Landscape Water Efficiency (Chapter 10.19 of the Anaheim Municipal Code), plus fertilizer and/or pesticide usage shall be consistent with County Management Guidelines for Use of Fertilizers {DAMP Section 5.5). See also, efficient irrigation systems under structural controls.

N4 BMP maintenance - Homeowners Associations· {HOAs) shall be responsible for the inspection and maintenance of structural BMPs {including treatment controls) located within the HOA boundaries. These BMPs are outlined below.

N11 Common area litter control- HOA shall conduct litter patrol; provide for covered trash receptacles, trashcans with lids, and emptying of trash receptacles in common areas; note trash disposal violations by tenants/homeowners or businesses and report the violations to the owner/HOA for investigation shall be conducted.
13 .... R~sporis,J,lefor,: .... ·
) ·•.•·· .;)MdhltoH,ig :: · • •. ·cor11~1;f16if
- - -- - - - - - - - - .. .. -
N14 Common area drainage facility inspection - Privately-owned drainage facilities shall be inspected each year and, if necessary, cleaned and maintained prior to the storm season, no later than October 1 st
each
year. Drainage facilities include catch basins and inlets, catch basin inserts, water quality basins, detention basins, other treatment facilities, and open drainage channels.

N 15 Street sweeping private streets and parking lots - Streets shall be, swept prior to the storm season in late summer/early fall, no later than October 1st of each year. Parking lots at the private community center shall be swept weekly at a minimum, weather permitting.

Structural Source Control BMPs
• Provide Storm Drain Stenciling and Signage - all storm drain inlets and catch basins, constructed or modified, within the project area shall be stenciled or labeled. Signs, which prohibit illegal dumping, shall be posted at public access points along channels and creeks within the project area. Legibility of stencils and signs shall be maintained.
• Trash Area Design - trash areas shall be paved, designed not to allow run-on, screened or walled to prevent off-site transport of trash; and covered to minimize direct precipitation. Common area litter control shall include a litter patrol, covered trash receptacles, emptying of trash receptacles in a timely fashion, and noting trash violations by tenants/homeowners and reporting the violations to the owner/HOA for investigation. Connection of trash area drains to the municipal storm drain system shall be prohibited.
• Efficient Irrigation - the timing and application methods of irrigation water in common areas shall minimize the runoff of excess irrigation water into the storm water conveyance system.
• Protect Slopes and Channels - storm water BMPs shall be included to decrease the potential for erosion of slopes and/or channels, and may include appropriate conveyance structures, landscaping, etc. • Hillside Landscaping - Hillside areas that are disturbed by project development shall be landscaped with deep-rooted, drought tolerant plant species selected for erosion control.
• Fire Station - Catch basin inserts with hydrocarbon absorption mats shall be provided for the fire station and vehicle maintenance shall be performed indoors and shall therefore not enter into the storm drain system because indoor drains flow to the sanitary sewer system.
c. Treatment Control BMPs: The following treatment control BMPs are a part of the conceptual water quality treatment program included in the Mitigation Monitoring Program No. 137 14
.. - - -
- - - - - - - - - - ----------
Timing
SECTION 4.6 - BIOLOGICAL RESOURCES
Existing Regulations & Standard Conditions
Prior to approval of mass or rough grading SC 6-1
plans impacting jurisdictional areas.

Mitigation Monitoring Program No. 137
Mountain Park Specific Plan (refer to Exhibit 3-10). Prior to the issuance of grading permits, the property owner/developer shall include the following features in the final WQMP submitted to the Department of Public Works for review and approval.
• Storm water runoff from the disturbance area shall be routed to nine water quality basins. Collectively, the water quality basins shall treat runoff from approximately 488 acres within the disturbance area.

The water quality basins shall incorporate dry extended detention to provide water quality treatment for storm flows. Dry extended detention basins are designed with outlets that detain the runoff volume from the water quality design storm (e.g., the 85th percentile 24-hour event) for some minimum time (36 hours) to allow particles and associated pollutants to settle out.
• The water quality basins shall incorporate wetland vegetation along the low flow channel in the bottom of the basin for the treatment of dry weather flows and small storm events. These basins shall not contain ponded or standing water for periods in excess of 48 hours. • The park and school site shall have a water quality basin or BMP with equivalent treatment effectiveness with the sizing of the treatment based on the DAMP/LIP requirements.
• Per the MS4 permit, the water quality basins within the proposed project shall be designed to contain a "water quality pool" sized to meet the maximized storm water capture volume for the area, from the formula recommended in Urban Runoff Quality Management, WEF Manual of Practice No. 23/ASCE Manual of Practice No. 87 (1998). The water quality pool is designed to drain in 36 hours. • Approximately 4.1 acres of roadway that does not drain to the basins shall be treated with filter strips (a type of biofilter) designed per the MS4 permit and DAMP/LIP requirements treating a flow rate two times the 85th percentile hourly rainfall as determined by historical rainfall. The water tank located in Development Area 7 shall also be treated using a filter strip or a bioswale, designed per DAMP/LIP requirements.
• Offsite roadway improvements shall be treated by BMPs providing treatment equivalent to that provided by biofiltration (bioswales or filter strips) sized pursuant to the criteria in the MS4 permit. , Re$ponsible'for,, . . . .. • . •,.· . .. . .. . .·
. ;\ ::Morilt6Hif@';,,;(·.· .. lcorn~leti~n
Prior to approval of mass or rough grading plans impacting jurisdictional Department of Public areas, the property owner/developer shall provide written evidence to the Works Department of Public Works of compliance with the provisions of Section 1602 of the California Fish and Game Code. This shall be accomplished by providing a copy of the executed Streambed Alteration Agreement. 15 - .. ------ - - ----------
Timing
Prior to approval of mass or rough grading SC 6-2
plans impacting jurisdictional areas.

Prior to approval of mass or rough grading SC 6-3
plans.

Prior to approval of mass or rough grading SC 6-4
plans.

Prior to approval of mass or rough grading plans impacting jurisdictional Department of Public areas, the property owner/developer shall provide the Department of Public Works Works with a copy of the executed Section 404 permit obtained from the Army Corp of Engineers (ACOE).

Prior to approval of mass or rough grading plans, the property Department of Public owner/developer shall provide the Department of Public Works with a copy of Works the Section 401 water quality certification obtained from the Regional Water Quality Control Board (RWQCB).

Prior to approval of mass or rough grading plans, the project biologist shall Department of Public review the following contract specifications to verify that the following Works measures to minimize impacts to the coastal California gnatcatcher and other coastal sage scrub (CSS) species have been included on the specifications. The project biologist shall provide written evidence to the Department of Public Works in the form of a note on the grading plans that this condition has been completed.
• To the maximum extent practicable, no grading of coastal sage scrub (CSS) habitat that is occupied by nesting gnatcatchers will occur during the breeding season (February 15 through July 15). It is expressly understood that this provision and the remaining provisions of these "construction-related minimization measures" are subject to public health and safety considerations. These considerations include unexpected slope stabilization, erosion control measures and emergency facility repairs. In the event of such public health and safety circumstances, landowners or public agencies/utilities will provide United State Fish and Wildlife Service/California Department of Fish and Game (USFWS/CDFG) with the maximum practicable notice (or such notice as is specified in the Natural Communities Conservation Program/Habitat Conservation Plan (NCCP/HCP) to allow for capture of gnatcatchers, cactus wrens, and any other CSS Identified Species that are not otherwise flushed, and will carry out the following measures only to the extent as practicable in the context of the public health and safety considerations.
• Prior to commencement of grading operations or other activities involving significant soil disturbance, all areas of CSS habitat to be avoided under the provisions of the NCCP/HCP, shall be identified with temporary fencing or other markers clearly visible to construction personnel. Additionally, prior to the commencement of grading operations or other activities involving disturbance of CSS, a survey will be conducted to locate gnatcatchers and cactus wrens within 100 feet of the outer extent of projected soil disturbance activities and the locations of any such species shall be clearly marked and identified on the construction/grading plans.

Mitigation Monitoring Program No. 137 16
---------- ---------
Prior to approval of mass or rough grading SC 6-5
plans.

Mitigation Monitoring Program No. 137
• A monitoring biologist, acceptable to USFWS/CDFG will be on-site during any clearing of CSS. The landowner or relevant public agency/ utility will advise USFWS/CDFG at least seven (7) calendar days [and preferably fourteen (14) calendar days] prior to the clearing of any habitat occupied by Identified Species to allow USFWS/CDFG to work with the monitoring biologist in connection with bird flushing/capture activities. The monitoring biologist will flush Identified Species (avian or other mobile Identified Species) from occupied habitat areas immediately prior to brush-clearing and earth-moving activities. If birds cannot be flushed, they will be captured in mi$t nets, if feasible, and relocated to areas of the site to be protected or to the NCCP/HCP Reserve System. It will be the responsibility of the monitoring biologist to assure that Identified bird species will not be directly impacted by brush-clearing and earth-moving equipment in a manner that also allows for construction activities on a timely basis.
• Following the completion of initial grading/earth movement activities, all areas of CSS habitat to be avoided by construction equipment and personnel will be marked with temporary fencing and other appropriate markers clearly visible to construction personnel. No construction access, parking, or storage of equipment or materials will be permitted within such marked areas.
• In areas bordering the NCCP Reserve System or Special Linkage/Special Management areas containing significant CSS identified in the NCCP/HCP for protection, vehicle transportation routes between cut-and-fill locations will be restricted to a minimum number during construction consistent with project construction requirements. Waste dirt or rubble will not be deposited on adjacent CSS identified in the NCCP/HCP for protection. Pre-construction meetings involving the monitoring biologist, construction supervisors, and equipment operators will be conducted and documented to ensure maximum practicable adherence to these measures.
• CSS identified in the NCCP/HCP for protection and located within the likely dust drift radius of construction areas shall be periodically sprayed with water to reduce accumulated dust on the leaves as recommended by the monitoring biologist.

Prior to approval of mass or rough grading plans, the property Planning Department owner/developer shall report the amount of coastal sage scrub that would be impacted by proposed grading activities. The amount of coastal sage scrub impacts shall be noted on plans submitted for grading permits and submitted to the Planning Department and to the Nature Reserve of Orange County (NROC) to ensure that a proper accounting of coastal sage scrub impacts is recorded for purposes of the NCCP/HCP.
17 -------- - - ---------
, , < , ,,
''i:f\fL.st;.·•i••
•.·.,; . ,
. ·-.~!ti1i:~~/t;;:•·-· ••c:~tn,l~ti~~,
··, ',
y;\). ·••'> •••::
;·.,.,_.·:·
Timing ,
•
/\ '.Mea•ure. •·. '
On an annual basis until grading activities SC 6-6 On an annual basis until grading activities are complete, the property Planning Department are complete. owner/developer shall provide the Planning Department and Nature Reserve of Orange County (NROC) with a calculation of the total amount of coastal sage scrub that has been removed during the calendar year.

Prior to approval of mass or rough grading SC 6-7 Prior to approval of mass or rough grading plans, the project biological Department of Public plans. monitor shall provide written verification to the Department of Public Works Works that the appropriate provisions of the comprehensive mitigation program for the foothill mariposa lily approved by the United State Fish and Wildlife Service (USFWS) and California Department of Fish and Game (CDFG) in March 2004 for the Irvine Company's "North Ranch" projects (including the Mountain Park Specific Plan project) shall be implemented consistent with the approved plan. The March 2004 mitigation program is included in Appendix E.

Project Design Features
Prior to approval of tentative tract or parcel PDF 6-1 Prior to approval of tentative tract or parcel maps, the project biologist shall Planning Department maps. submit written verification in the form of a note on the tentative tract or parcel maps, that the project development boundaries are consistent with the Open Space, Trail and Bikeway Plan identified in Exhibit 3-8 of the Draft EIR (included in Attachment A). The proposed project includes 2,163 acres of preserved open space: NCCP/HCP Reserve (940 acres), The Nature Conservancy Anaheim Conservation Easement (TNC ACE) (913 acres) and 310 acres of additional open space throughout the project site not related to the NCCP/HCP Reserve or TNC ACE.

Mitigation Measures
Prior to initiation of construction activities. MM 6-1 Prior to initiation of construction activities, the property owner/developer shall Planning Department retain a project biological monitor approved by both the United States Fish and Wildlife Services and California Department of Fish and Game. The project biological monitor shall ensure that all permit conditions are met, all mitigation measure.s are properly implemented, and that the project complies with all standard conditions and project design features. The project biological monitor shall also be present during any pre-grade meetings, mass grading operations, and periodically during construction to ensure that sensitive resources designated for preservation are properly protected.

Beginning with the initiation of construction or grading activities, the project biological monitor shall submit monthly status reports to the Planning Department to demonstrate compliance with this measure.

Prior to the approval of mass or rough MM 6-2 Prior to the approval of mass or rough grading plans impacting jurisdictional Department of Public grading plans impacting jurisdictional areas. areas, the property owner/developer shall provide a wetland mitigation plan Works approved by the ACOE (for Section 404 areas) and CDFG (for the Section 1602 areas) to the Department of Public Works. A total of 14.1 acres of riparian mitigation are necessary to offset the loss of ACOE and CDFG jurisdictional areas as a result of the proposed project. A Conceptual Wetland and Riparian Habitat Mitigation Plan has been prepared by JSA (February, 2005). The purpose of the mitigation plan is to:

Mitigation Monitoring Program No. 137 18
- - - - - -
Timing
Prior to approval of mass or rough grading MM 6-3
plans.

Prior to approval of mass or rough grading MM 6-4
plans for Development Areas 1, 2, 3, 4
and 7.

Mitigation Monitoring Program No. 137
- - - - - - - - - - -
•
•
Create (establish), restore, or enhance wetland/riparian habitats on-site to the maximum extent practicable to minimize the on-site loss of ACOE and CDFG jurisdictional acreage and function, and provide off-site mitigation for the remainder of the impacts;
To implement, to the extent practicable, off-site mitigation in the Santa Ana River watershed, as close to the study area as possible or otherwise at a key ecological site;
• To return jurisdictional habitats that are temporarily disturbed during construction to pre-construction conditions; and,
• To ensure that adjacent non-jurisdictional habitats are protected.

The preferred on-site mitigation approach shall be approved by the ACOE, CDFG and RWQCB during the permitting process. One possible component of the on-site mitigation, to address the impacts of the box extension on the already disturbed Gypsum Canyon Creek channel, could include a rebuilt creek as a low-flow riparian corridor through the canyon mouth area.

Conceptually, the box extension shall act as a high-flow by-pass that efficiently conveys the more intense and destructive flood flows. The riparian corridor shall extend upstream to the road crossing of Gypsum Canyon Creek. The riparian corridor shall consist of a riverine channel flanked by planted embankments. The riverine channel would be soft bottom and the riparian vegetated floor would be nurtured by low an.d seasonal run-off diverted into it from a channel split from the new box culvert opening. This "splitter" shall consist of a junction opening that becomes a tunnel that would accommodate storm flows as well as wildlife movement under the road crossing to the riparian corridor.
:c ResponsU>le·forr ·. •:'M66ltbrih({'\>
Prior to approval of mass or rough grading plans, the property Department of Public owner/developer shall submit copies of contractor specifications to the Works Department of Public Works that include the following note: "Initial clearing of vegetation that has been identified as being used by the southwestern willow flycatcher shall be conducted outside of the breeding season or with the presence of a biological monitor during the breeding season to ensure that no individuals of this species are directly impacted. The breeding season for the southwestern willow flycatcher is between May 15 and July 31." Following completion of initial clearing of vegetation, the project biological monitor shall provide written evidence to the Planning Department that this measure has been completed.

Prior to approval of mass or rough grading plans for Development Areas 1, 2, Planning Department 3, 4 and 7, the project biologist shall provide to the Planning Department a translocation program for the many-stemmed dudleya, approved by the United States Fish and Wildlife Service and California Department of Fish and Game. The project biological monitor shall provide written notification to the Planning Department when the translocation program has been completed. The Mountain Park many-stemmed dudleya translocation program shall utilize the following techniques and meet the following standards:
19 - -
- - - - - - -
Timing
Prior to approval of street improvement MM 6-5
plans for Gypsum Canyon Road.

Prior to approval of mass or rough grading MM 6-6
plans.

Mitigation Monitoring Program No. 137
•
- - - - - - - - -
Relocation of a minimum of at least 50 percent of the corms from impact areas to receptor sites. The relocation of topsoil including corms (topsoil relocation method) shall occur in late fall/early winter (November­ January). Corm salvage using the "soil sieving method" shall occur when soils are still dry; therefore, as early as possible between October and December. Corms collected using the "soil sieving method" shall be replanted as soon as possible after collection (November-January). • Seed collection from impact areas followed by hand broadcasting at appropriate receptor sites; and seed collection with propagation, nursery rearing, and translocation to appropriate sites. Seed collection would occur in late spring (May-June).
-
Prior to approval of street improvement plans for Gypsum Canyon Road, the Department of Public property owner/developer shall submit copies of contractor specifications to Works the Department of Public Works that include the following requirements to protect the summer roost of Yuma myotis within the Gypsum Canyon culverts under the 91 Freeway: (1) construction activities to lengthen the culverts shall be scheduled outside of the critical breeding time (May 1 through August 15) to avoid direct impacts; (2) if construction must occur between May 1 and August 15, all construction activities shall occur outside the current culverts and no deeper than 25 feet inside the culverts to avoid a negative effect on the colony; (3) no night work shall occur around the culvert openings and only construction lighting necessary for safety purposes shall be used near the culvert openings. Following completion of construction activities associated with the culverts, the project biological monitor shall provide written notification to the Planning Department that the contractor specifications have been complied with.

Prior to approval of mass or rough grading plans, the property owner/ Department of Public developer shall submit copies of contractor specifications to the Department Works of Public Works that include the following requirements to protect nesting birds regulated by the Migratory Bird Treaty Act: "When feasible, vegetation removal activities shall be scheduled between July 16 and February 14 to avoid the nesting season. This would ensure that no active nests would be disturbed and that removal could proceed rapidly. If vegetation removal activities shall occur during the nesting season (February 15 to July 15), all suitable habitat shall be thoroughly surveyed for the presence of nesting birds by a qualified biologist prior to removal. If any active nests are detected, the area shall be flagged, along with a minimum 50-foot buffer (buffer may range between 50 and 300 feet as determined by the monitoring biologist), and shall be avoided until the nesting cycle is complete or it is determined by the monitoring biologist that the nest has failed." In addition, a biologist shall be present on the site to monitor the vegetation removal to ensure that nests not detected during the initial survey are not disturbed. The project biological monitor shall provide written notification to the Planning Department that these requirements have been accomplished following completion of grading activities associated with each grading permit. 20 - -
- - ------ - - -------- -
···./ . 'k•,~i:,,'/J:;:?:i' ·•·• ;.· tf ·;:fr:·;(.'Mit 'f \r< ·.·· '
;~1:&i1m~w,tr'.:' ·
<-,,,; __ (;.:._',,-·
Timing· \x,_,iur; '"
,'(
,,' '
' Cbrtipl•ti6i1 ; ' ',,'. ·,'. ,'' ''
Prior to the issuance of building permits. MM 6-7 Prior to the approval of each final tract or parcel map or the issuance of Planning Department grading permits. whichever occurs first, the property owner/developer shall provide the Department of Public Works with a Natural Resource Management Plan to be included in the Conditions, Covenants, and Restrictions (CC&Rs) for open space areas to be maintained by the Homeowner's Association. The Natural Resource Management Plan shall include requirements, including timing restrictions, for vegetation removal from water quality basins included in the Water Quality Management Plan; management of native habitat within open space areas; proper management of household pets to avoid impacts to native species; and, rules and regulations for human use of open space areas.

Prior to issuance of building permits. MM 6-8 In conjunction with the sale of each dwelling unit, the property Planning Department owner/developer shall provide each homeowner with a copy of the Nature Reserve of Orange County Wildland Interface Brochure, along with its attachments. The brochure shall be included as part of the sales literature for the project to educate homeowners on the responsibilities associated with living at the wildland interface. The brochure shall address relevant issues, including the role of natural predators in the wildlands and how to minimize impacts of humans and domestic pets on native communities and their inhabitants A copy of the brochure shall be provided to the City of Anaheim Planning Department prior to the first final building and zoning inspection.

SECTION 4.7 - TRAFFIC AND CIRCULATION
Existing Regulations & Standard Conditions
Prior to the issuance of each building SC 7-1 Prior to the issuance of each building permit, the Foothill/Eastern Planning Department permit. Transportation Corridor Major Thoroughfare and Bridge Fees shall be paid by the property owner/developer to the City of Anaheim. Payment of these fees provides for the project's fair share contribution to the ultimate improvements to SR-241 and SR-261.

Project Design Features
Prior to approval of each tentative tract or PDF 7-1 The Mountain Park Specific Plan includes a circulation system consisting of City Engineer parcel map. on-site roadways (refer to Exhibit 4.7-5 of the Draft EIR included in Attachment A). The tentative tract or parcel maps submitted for review and approval, will incorporate preliminary street design features (i.e., cross- sections, alignment and grades) demonstrating consistency with the proposed circulation system. Prior to approval of each tentative tract or parcel map, the subdivision map shall be prepared consistent with the Mountain Park Specific Plan Circulation System Plan (Exhibit 4. 7-5 of the Draft EIR) to the satisfaction of the City Engineer. All street improvements within the subdivision map shall be completed prior to the final building and zoning inspection for units served by said improvement.

Mitigation Monitoring Program No. 137 21
---------- -------
Prior to approval of development area plans PDF 7-2
and tentative tract or parcel map.

The Mountain Park Specific Plan includes a circulation system including the following off-site roadway improvements (refer to Exhibit 4.7-5 of the Draft EIR included in Attachment A) identified in the Mountain Park Specific Plan, the City of Anaheim General Plan and Orange County Master Plan of Arterial Highways. The development area plans and tentative tract or parcel maps, submitted for review and approval, shall incorporate preliminary street design features (i.e., cross-sections, alignment and grades) demonstrating that the proposed circulation system is consistent with that defined in the Mountain Park Specific Plan, the City of Anaheim General Plan and the Orange County Master Plan of Arterial Highways.
• Gypsum Canyon Road - Improved from a two-lane undivided roadway to a four-lane divided roadway from the SR-91 westbound off-ramp to the proposed Santa Ana Canyon Road realignment. A construction contract for improvements to this portion of Gypsum Canyon Road shall be awarded prior to issuance of the first building permit in development areas east of SR-241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development for areas east of SR-241.
• Santa Ana Canyon Road - Realign and improve from a two-lane undivided roadway to a four-lane divided roadway from SR-241 to Gypsum Canyon Road. A construction contract for improvements to this portion of Santa Ana Canyon Road shall be awarded prior to issuance of the first building permit in development areas east of SR-241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development for areas east of SR-241.
• Weir Canyon Road (Oak Canyon Drive to Blue Sky Way) - Restripe approximately 600-feet to transition from a six-lane roadway at Oak Canyon Drive to a four-lane roadway at Blue Sky Way prior to issuance of the first building permit for Development Areas 3 or 7, whichever occurs first.
• Weir Canyon Road (Blue Sky Way to SR-241) - Construct as a four-lane divided roadway from Blue Sky Way to SR-241 (includes elimination of the northbound left-turn lane at the Weir Canyon Road/Blue Sky Road intersection). Improvements to this portion of Weir Canyon Road shall be completed prior to the first final building and zoning inspection for Development Areas 3 or 7, whichever occurs first.
• Gypsum Canyon Road and SR-91 Westbound Ramp intersection - Add second northbound through lane. A construction contract for improvements to this portion of intersection shall be awarded prior to issuance of the first building permit for development areas east of SR- 241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development for areas east of SR-241.

Mitigation Monitoring Program No. 137 22
- -
------------- - - - - - -
· Respoh~ibl!9 ,for,,
•" Jlftonltorlng, . ; <', .:·cdhipl~tlbh
Prior to completion of the Mountain Park PDF 7-3
Drive bridge over-crossing.

Prior to opening of models for development PDF 7-4
areas east of SR-241.

Mitigation Measures
Prior to issuance of the first building permit. MM 7-1
• Gypsum Canyon Road and SR-91 Eastbound Ramp intersection -.Add City Engineer second northbound and southbound through lanes. A construction contract for improvements to this portion of intersection shall be awarded prior to issuance of the first building permit in development areas east of SR-241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development areas for east of SR-241.
• Gypsum Canyon Road/Santa Ana Canyon Road intersection - Improve to provide two southbound through lanes and a southbound right-turn lane, two northbound through lanes and a northbound left-turn lane, and two eastbound left-turn lanes and an eastbound right-turn lane. A construction contract for improvements to this intersection shall be awarded prior to the issuance of the first building permit in development areas east of SR-241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development for areas east of SR-241.
• Oak Canyon Drive, east of Running Springs Road - This portion of Oak Canyon Drive within City right-of-way will be abandoned by the City of Anaheim and improved with a vehicle maintenance road and landscaping (see Exhibit 3-17). The maintenance road will be gated to the satisfaction of the City Engineer. Improvements associated with this portion of Oak Canyon Drive within City right-of-way shall be substantially completed prior to issuance of the first building permit in development areas west of SR-241.

The proposed project includes the construction of the SR-241/Weir Canyon Department of Public Road interchange with ramps to and from the south on SR-241 and Works construction of a bridge over SR-241 for Mountain Park Drive. Prior to completion of the Mountain Park Drive bridge over-crossing, the design for the construction of the SR-241/Weir Canyon Road interchange shall be awarded. Construction of the SR-241/Weir Canyon Road interchange shall be completed prior to issuance of the 421st building permit on the east side of SR-241.

The proposed project includes the construction of a bridge over SR-241 for Department of Public Mountain Park Drive. Prior to opening of models for development areas east Works of SR-241, the Mountain Park Drive over-crossing construction shall be completed.

Prior to issuance of the first building permit, the property owner/developer Department of Public shall make one lump sum payment for the fair share of the cost to the City of Works Anaheim for implementation of the following roadway and intersection improvements. Evidence of payment shall be provided to the Department of Public Works.
• Weir Canyon Road/La Palma Avenue Intersection - (1) Add a third northbound through lane and convert southbound right-turn lane to shared third through/right-turn lane; and (2) convert the second Mitigation Monitoring Program No. 137 23
- - -------------- - - -
Prior to approval of street improvement plans MM 7-2
for Mountain Park Drive.

Prior to the approval of each development MM 7-3
area plan.

Mitigation Monitoring Program No. 137
eastbound through lane to a shared second through/second right-turn lane (this would require eliminating the existing eastbound right-tum green arrow overlap with the northbound left-turn movement). The first improvement is committed to be constructed before the year 2010 by the Cities of Anaheim and Yorba Linda using secured Orange County Measure M funds and expected matching local funds from the City of Yorba Linda and the City of Anaheim Redevelopment Agency. The property owner/developer is responsible for paying its fair share of the funds that have yet to be allocated by the City of Anaheim. The second improvement is not funded and the property owner/developer shall be responsible for paying its fair share of the entire cost of the improvement. The project share of future AM and PM peak hour traffic at this intersection under 2025 MPAH build-out conditions with the East Orange GPA and MPAH Amendments is approximately 37 percent. • Weir Canyon Road between La Palma Avenue and SR-91 - Improve the operations of the section of roadway at SAVI Ranch Road/Weir Canyon Road through geometric improvements, adding directional signage and providing an interconnected signal to optimize traffic movement progression within the mid-block segment. This improvement is committed to be implemented by the Cities of Anaheim and Yorba Linda before the Year 2010 using secured OCTA Measure M funds and matching local funds that have yet to be allocated. The property owner/developer is responsible for paying its fair share of the funds that have yet to be allocated by the City of Anaheim. The project share of future AM and PM peak hour traffic on this roadway under 2025 MPAH build-out conditions with the East Orange GPA and MPAH Amendments is approximately 30 percent.
• Weir Canyon Road/Santa Ana Canyon Road Intersection - Convert eastbound third through lane to third left-turn lane. The property owner/developer shall be responsible for paying its fair share of the entire cost of the improvement as determined by the Department of Public Works. The project share of future AM and PM peak hour traffic at this intersection under 2025 MPAH build-out conditions with the East Orange GPA and MPAH Amendments is approximately 35 percent. The City of Anaheim shall monitor the Level of Service at this intersection at a minimum every two years and, per the requirements of the OCTA Measure M funding, is committed to funding the remaining costs of the improvements at such time as the improvements are deemed necessary to provide an acceptable Level of Service D at this location.

Prior to approval of street improvement plans for Mountain Park Drive, the Department of Public property owner/developer shall provide a final roadway design plan to the Works Department of Public Works with Mountain Park Drive designed to Modified Hillside Collector standards and with curvilinear alignments that provide adequate sight distance for safety purposes as approved by City Engineer.

Prior to the approval of each development area plan, the property Department of Public owner/developer shall submit a traffic phasing plan. The plan shall be Works, Development 24 - - - - -
Prior to approval of a grading plan for each
development area.

SECTION 4.8 - AIR QUALITY
Mitigation Measures
Prior to approval of the first grading plan.

Mitigation Monitoring Program No. 137
- - - - - - - - - - - - - -
MM 7-4
reviewed and approved by the Department of Public Works, Development Services Division and Traffic Engineering Division, and the Fire Department.

The plan shall also be submitted for review and comment by Caltrans if any portion of the plan involves Caltrans facilities. The plan shall include the following items:

1. Documentation of the number of units and product types of each development area, and resulting Level of Service (LOS) shall be provided for locations listed in PDF 7-2.

2. Phasing of roadway construction, specifying which roads shall be constructed as backbone streets and which roads shall be constructed with tract development.

3. Traffic improvements (including signals, signage and striping) to local streets, arterials and intersections, freeway interchanges and bridge over-crossings.

4. Identification of measures that will be incorporated to minimize the impacts of project construction traffic on Gypsum Canyon Road between the SR-91 westbound off-ramp and Santa Ana Canyon Road; Gypsum Canyon Road/SR-91 interchange ramps; and Santa Ana Canyon Road between Gypsum Canyon Road and Weir Canyon Road prior to completion of the improvements listed in PDF 7-2.

Prior to approval of a grading plan for each development area, the property owner/developer shall submit a traffic control plan including construction haul routes, duration and location of lane closures, and any pedestrian-related impacts to sidewalks and intersection crossings, for review and approval by the Department of Public Works, Development Services Division and Traffic Engineering Division.

Construction: Particulate Emission (PM10) Control
MM 8-1 Prior to approval of the first grading plan, the following requirements shall be incorporated into the Storm Water Pollution Prevention Program (SWPPP) and Erosion and Sedimentation Control Plan submitted for review and approval by the Department of Public Works. During construction of the proposed project, the property owner/development and its contractors shall be required to comply with regional rules, which shall assist in reducing short-term air pollutant emissions. SCAQMD Rule 402 requires that air pollutant emissions not be a nuisance off-site. SCAQMD Rule 403 requires that fugitive dust be controlled with the best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. Two options are presented in Rule 403: monitoring of particulate concentrations or active control.

Monitoring involves a sampling network around the project with no additional control measures unless specified concentrations are exceeded. The active control option does not require any monitoring, but requires that a list of measures be implemented starting with the first day of construction. 25 , , Respontlible for .
. Monitoring · · :C6rnpleti~6 ,
Services Division,
Traffic Engineering
Division, and
Caltrans (if plan
involves Caltrans
facilities)
Department of Public
Works, Development
Services Division, and
Traffic Engineering
Division.

Department of Public
Works
- - - - - -
... 'riming
Mitigation Monitoring Program No. 137
- - - - - - - - - - - -
Rule 403 requires that "No person conducting active operations without utilizing the applicable best available control measures included in Table 1 of this Rule to minimize Fugitive dust emissions from each fugitive dust source type within the active operation." The measures from Table 1 of Rule 403 are provided in Attachment B. The applicable measures presented in Table 1 are required to be implemented by Rule 403.

Rule 403 requires that "Large Projects" implement additional measures. A Large Project is defined as "any active operations on property which contains 50 or more acres of disturbed surface area; or any earth-moving operation with a daily earth-moving or throughput volume of 3,850 cubic meters (5,000 cubic yards) or more three times during the most recent 365 day period.

Grading of the project would be considered a Large Project under Rule 403.

Therefore, the project shall be required to implement the applicable actions specified in Table 2 of the Rule. Table 2 from Rule 403 is presented in Attachment B. As a Large Operation, the project shall also be required to:
• Submit a fully executed Large Operation Notification (SCAQMD Form 403N) to the SCAQMD Executive Officer within 7 days of qualifying as a large operation;
• Include, as part of the notification, the name(s), address(es), and phone number(s) of the person(s) responsible for the submittal, and a description of the operation(s), including a map depiyting the location of the site;
• Maintain daily records to document the specific dust control actions taken, maintain such records for a period of not less than three years; and make such records available to the Executive Officer upon request. • Install and maintain project signage with project contact signage that meets the minimum standards of the Rule 403 Implementation Handbook, prior to initiating any earthmoving activities. • Identify a dust control supervisor that is employed by or contracted with the property owner/developer, is on the site or available on-site within 30 minutes during working hours, has the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule requirements, and has completed the AQMD Fugitive Dust Control Class and has been issued a valid Certificate of Completion for the class. • Notify the SCAQMD Executive Officer in writing within 30 days after the site no longer qualifies as a large operation.
26 -
- - - - -
Timing·
Prior to approval of grading plans.

Mitigation Monitoring Program No. 137
- - - - - - - - - - - -
Rule 403 also requires that the construction activities "shall not cause or allow PM10 levels exceed 50 micrograms per cubic meter when determined by simultaneous sampling, as the difference between upwind and down wind sample." Large Projects that cannot meet this performance standard are required to implement the applicable actions specified in Table 3 of Rule 403.

Table 3 from Rule 403 is presented in Attachment B. Rather than perform monitoring to determine conformance with the performance standard, which will not reduce PM10 emissions, the project shall implement all applicable measures presented in Rule 403 Table 3 regardless of conformance with the Rule 403 performance standard. This potentially results in a higher reduction of particulate emissions than if these measures were implemented only after being determined to be required by monitoring.

Further, Rule 403 requires that that the project shall not "allow track-out to extend 25 feet or more in cumulative length from the point of origin from an active operation." All track-out from an active operation is required to be removed at the conclusion of each workday or evening shift. Any active operation with a disturbed surface area of five or more acres or with a daily import or export of 100 cubic yards or more of bulk materials must utilize at least one of the measures listed in Attachment B at each vehicle egress from the site to a paved public road.

Construction: Construction Equipment Emission Control
MM 8-2 Prior to approval of grading plans, the property owner/developer shall include the following notes on the contractor specifications submitted for review and approval by the Department of Public Works: 'To reduce construction equipment emissions, the following measures shall be implemented when feasible.
• Use low emission mobile construction equipment. The property owner/ developer shall comply with CARB requirements for heavy construction equipment.
• Maintain construction equipment engines by keeping them tuned. • Use low sulfur fuel for stationary construction equipment. This is required by SCAQMD Rules 431.1 and 431.2.
• Utilize existing power sources (i.e., power poles) wh·en feasible. This measure would minimize the use of higher polluting gas or diesel generators.
• Configure construction parking to minimize traffic interference. • Minimize obstruction of through-traffic lanes. When feasible, construction should be planned so that lane closures on existing streets are kept to a minimum.
• Schedule construction operations affecting traffic for off-peak hours. 27 Department of Public
Works
- -
- - - -
Prior to issuance of each building permit.

Mitigation Monitoring Program No. 137
- - - - - - - - - -
• Develop a traffic plan to m1rnm1ze traffic flow interference from construction activities (the plan may include advance public notice of routing, use of public transportation and satellite parking areas with a shuttle service.
• Use aqueous diesel fuel where feasible and reasonably commercially available.
• Use cooled exhaust gas recirculation (EGR) where feasible and reasonably commercially available.

Several of the mitigation measures listed above are advanced emission control technologies, which are currently not commercially available. For example, aqueous diesel fuel reduces NOX formation by reducing combustion temperatures, resulting in lower NOX emissions. According to the SCAQMD, the current availability of this fuel technology is limited, and it may not be available for use for the project. In addition, with EGR diesel engines, a small amount of hot exhaust gas is routed through a cooler and mixed with fresh air entering the engine. The exhaust gas helps reduce the temperature during combustion, which lowers the formation of thermal NOX.

EGR technology is in the development phase, and has not been fully commercialized. To the extent that the advanced emissions control technologies become reasonably commercially available, or are required by the CARB from grading contractors, then such advanced emissions control technologies shall be used.
- -
Regional Operational Impacts Planning Department
MM 8-3 The property owner/developer shall reduce operation-related em1ss1ons through implementation of practices identified in SCAQMD's CEQA Handbook and the URBEMIS2002 model. SCAQMD's CEQA Handbook includes several measures that can be used to minimize emissions associated with residential projects. In addition, the URBEMIS2002 model identifies several measures, some of which overlap those in the CEQA Handbook. The following measures, based on these sources, shall be implemented by the property owner/developer and contractors, where feasible to reduce criteria pollutant emissions from stationary sources directly related to the project. Said measures shall be included on plans submitted for residential building permits:
• install solar or low-emission water heaters;
• use central water-heating systems;
• use built-in, energy-efficient appliances; and
• ensure that sidewalks and pedestrian paths are installed throughout the project area.
28 - -
- - - - 1111 - -
·.Timi~g-
Prior to issuance of each building permit.

Prior to initiation of grading activities in
Development Area 3.

SECTION 4.9 - NOISE
MM8-4
MM 8-5
Existing Regulations & Standard Conditions
Prior to approval of grading plans and/or SC 9-1
prior to issuance of building permits.

Prior to approval of grading plans and/or
prior to issuance of building permits.

Project Design Features
Prior to the approval of grading plans for
development areas that require sound
attenuation measures.

Mitigation Monitoring Program No. 137
SC 9-2
PDF 9-1
- - - ---------
All buildings shall comply with Title 24, Part 6. Reducing the need to heat or Planning Department cool structures by improving thermal integrity will result in a reduced expenditure of energy and a reduction in pollutant emissions. Any necessary written evidence and/or standard details demonstrating compliance with Title 24, Part 6, shall be included on plans submitted for building permits.

Prior to commencement of grading activities in Development Area 3, the Department of Public property owner/developer shall install a six-foot chain link fence with scrim Works along the northwestern property boundary. The fence shall be installed between Weir Canyon Road and Oak Canyon Drive. Proof of installation (letter from the property owner/developer and photographs of the fence) shall be submitted to and verified by the Public Works Department.

Prior to approval of grading plans and/or prior to issuance of building permits, Department of Public plans shall include a note indicating that noise-generating project Works construction activities in the City of Anaheim shall not occur between the hours of 7:00 p.m. and 7:00 a.m. This requirement applies to construction activities within 3,000 feet of residential uses, consistent with the City of Anaheim Noise Ordinance.

Prior to approval of grading plans and/or prior to issuance of building permits, Department of Public plans shall include a note indicating that noise-generating project Works construction activities north of SR-91 in the City of Yorba Linda shall not occur between the hours of 8:00 p.m. and 7:00 a.m. Monday through Saturday and at any time on Sunday or federal holidays, consistent with the City of Yorba Linda Noise Ordinance.

The Mountain Park Specific Plan includes a conceptual grading plan. The Department of Public conceptual grading plan includes berms in the following locations as shown Works on Exhibit 4.9-7 of the Draft EIR (included in Attachment A) that would reduce exterior noise levels in areas behind the berms to less than 65 CNEL.

Prior to the approval of grading plans for development areas that require sound attenuation measures, the property owner/developer shall submit grading plans to the Department of Public Works that demonstrate conformance with the conceptual grading plan included in the Specific Plan, including the following:
• Ten to 40 foot high berms (above pad elevation) along SR-241 in Development Area 4.
• Intermittent berms with heights 1 O to 20 feet above pad elevations are also included along SR-91 in Development Area 5. Final berm design shall be shown on precise grade permits for specific builder projects. 29 - - - - - - -
Mitigation Measures
Prior to the approval of grading plans for MM 9-1
Development Areas 3, 4, 5, and 7.

Prior to issuance of building permits for all MM 9-2
buildings in the areas indicated in Exhibit

4.9-8 of the Draft EIR (included in
Attachment A).

Prior to issuance of building permits. MM 9-3
Prior to the issuance of building permits for MM 9-4
the water pump station.

Mitigation Monitoring Program No. 137
- - - - - - - - - -
Prior to the approval of grading plans for Development Areas 3, 4, 5, and 7, a Planning Department detailed acoustical analysis shall be prepared by a qualified acoustical consultant and submitted to the Planning Department for review and approval. This acoustical analysis shall describe and quantify the noise sources impacting the area and the measures required to meet the 65 CNEL exterior residential noise standard. The final precise grading plans shall incorporate the noise barriers (wall, berm or combination wall/berm) required by the analysis and the property owner/developer shall install these barriers.

Based on the preliminary analysis, noise barriers of the heights shown in Exhibit 4.9-7 of the Draft EIR (included in Attachment A) would reduce exterior noise levels at on-site residences to acceptable levels.

Prior to issuance of building permits for all buildings in the areas indicated in Planning Department, Exhibit 4.9-8 of the Draft EIR (included in Attachment A), documentation Building Division shall be provided to the Planning Department, Building Division showing that the building meets the ventilation standards required by the Anaheim Building Code with windows closed. Alternatively, the property owner/developer shall show that based on the buildings location relative to the roadway it meets the appropriate interior noise standard with open windows.

Prior to issuance of building permits, a detailed acoustical study using Planning Department, architectural plans shall be prepared by a qualified acoustical consultant and Building Division submitted to the Planning Department, Building Division for residential structures (including the residential portion of the fire station) in the areas indicated in Exhibit 4.9-9 of the Draft EIR (included in Attachment A). This report shall describe and quantify the noise sources impacting the building(s), the amount of outdoor-to-indoor noise reduction provided in the architectural plans, and any upgrades required to meet the City's interior noise standards (45 CNEL for residences). The measures described in the report shall be incorporated into the architectural plans for the buildings and implemented with building construction.

Prior to the issuance of building permits for the water pump station, a Planning Department detailed noise assessment shall be prepared by a qualified acoustical consultant and submitted to the Planning Department for review and approval. The assessment shall utilize noise data provided by the manufacturer(s) of the equipment utilized at the station or noise measurements from substantially similar facilities to project noise levels at the residences in the vicinity of the water pump station. Compliance with the City's Noise Ordinance shall be demonstrated and any measures required to meet the Noise Ordinance shall be described and incorporated into the plans for the water pump station.
30 - -
- - - - -
111111} -
- - - - - - - - - -
Timing·
·• R~sporislb•e for ' ;;:, Monltbtlrig ; <
SECTION 4.10 - HAZARDS AND HAZARDOUS MATERIALS
Project Design Features
Prior to the approval of the first tentative tract PDF 10-1 or parcel map.

Prior to submittal of the first tentative tract or PDF 10-2 parcel map or approval of the first grading
plan, whichever occurs first.

Prior to submittal of each tentative tract or PDF 10-3
parcel map or grading plan, whichever
occurs first.

Mitigation Measures
During grading activities MM 10-1
Mitigation Monitoring Program No. 137
Prior to the approval of the first tentative tract or parcel map, the property Planning Department owner/developer shall enter into an agreement (Fire Protection Agreement) with the City of Anaheim. This agreement shall specify the property owner/ developer's pro-rata fair share funding of capital improvements necessary to establish adequate fire protection facilities and equipment to service the proposed development.

The property owner/developer shall be responsible for paying fees or otherwise providing for the design, construction and furnishing of the fire station, including all fire apparatus necessary to fully equip the fire station per the City's specifications, to adequately serve the project. The property owner/ developer shall also be responsible for dedicating a parcel for development of the fire station in the location specified in Exhibit 3-4 of the Draft EIR (Development Plan) included in Attachment A.

The fire station facility shall be constructed and operational prior to the issuance of the first building permit for any development area east of the SR-241, or as otherwise required by the Fire Department in the Fire Protection Agreement.

Prior to submittal of the first tentative tract or parcel map or approval of the Planning Department first grading plan, whichever occurs first, the property owner/developer shall submit a final Fire Master Plan (FMP) to the Fire Department for review and approval to ensure that fire protection for each Development Area is in accordance with Fire Department requirements. The final FMP shall be in substantial conformance with the preliminary FMP (Appendix R of the EIR).

A copy of the approved Fire Master Plan shall be submitted to the following City Departments: Planning, Police and Public Works.

The Mountain Park Specific Plan includes conceptual fuel modification Fire Department strategies. Prior to submittal of each tentative tract or parcel map or grading plan, whichever occurs first, fuel modification plans shall be submitted to the Fire Department for review and approval. The fuel modification plan shall be prepared in accordance with the provisions of the California Fire Code in effect at the time of submittal of the tentative tract or parcel map and be based upon the criteria set forth in the City of Anaheim Fire Department Fuel Modification Plan Guidelines. Prior to final Certificate of Occupancy for the first building in each Development Area fuel modification zones shall be installed and inspected in substantial conformance with the approved plans to the satisfaction of the Fire Department.

The Robertson's Ready Mix Quarry area will not be developed until after Fire Department reclamation and remediation are complete. Based on the Environmental Site Assessments performed for the project site (included in Appendix J), it is not anticipated that any underground storage tanks, septic systems, leach fields, or significant soil contamination will be encountered during construction, as construction shall occur after remediation and reclamation are complete. 31 - -
- - ---111111-
Timing
Prior to approval of grading plans within an MM 10-2
area in which the Southern Trails Pipeline is
located or is proposed to be relocated within
the grading plan boundaries.

Prior to approval of any grading plans within MM 10-3
a development area wherein the Southern
Trails Pipeline exists or is proposed to be
relocated.

Prior to issuance of building permits. MM 10-4
SECTION 4.11 - PUBLIC SERVICES & UTILITIES
Fire Protection
Existing Regulations & Standard Conditions
Prior to approval of each tentative tract or SC 12-1
parcel map.

Mitigation Monitoring Program No. 137
- - - - - - - - - - -
During grading activities, in the event these subsurface features or contaminated soil are encountered, work shall immediately cease in the area and the property owner/developer shall notify the Fire Department and Public Utilities, Environmental Services Division, and retain a qualified hazardous materials engineer to assess the impacts and prepare a response plan using the risk-based cleanup standards of the City of Anaheim and the Orange County Health Care Agency, and any appropriate guidelines issued by the California Environmental Protection Agency, Department of Toxic Substance Control, and the United States Environmental Protection Agency, applicable to residential land use. Upon approval of the response plan by the Fire Department, as applicable, the engineer shall obtain any required permits, oversee the removal of such features and/or conduct the response work to the satisfaction of the Fire Department or other agency, as applicable, until closure status is attained.

Prior to approval of grading plans within an area in which the Southern Trails Department of Public Pipeline is located or is proposed to be relocated within the grading plan Works boundaries, the property owner/developer shall obtain the approval of the Questar Pipeline Company. Written evidence of this approval shall be submitted to the Department of Public Works.

Prior to approval of any grading plans within a development area wherein the Fire Department Southern Trails Pipeline exists or is proposed to be relocated, the property owner/developer shall submit a safety plan to the Fire Department. If there are any environmental concerns relating to developing adjacent to the pipeline or relocating it identified during subsequent reviews, the property owner/developer shall be responsible for financing/implementing any necessary mitigation measures. The safety plan shall be consistent with safety regulations adopted by the Fire Department and shall also be consistent with the requirements of MM 10-4. The safety plan shall be reviewed by the Questar Pipeline Company and approved by the Fire Department. Relocation of the pipeline shall occur at no cost to the City.

Prior to issuance of building permits, the property owner/developer shall Public Utilities provide written evidence to the Public Utilities Department that the relocated Department Southern Trails Pipeline has been inspected and approved by the California Public Utilities Commission (CPUC).

Prior to approval of each tentative tract or parcel map, the property owner/ Fire Department developer shall demonstrate that the map has been prepared in compliance with applicable provisions of the Anaheim Municipal Code and the Mountain Park Specific Plan relevant to fire prevention and suppression, subject to the review and approval of the Fire Department.
32 -
- - - ------- - - - - - - - - -
· Timing
Police Protection
Existing Regulations & Standard Conditions
Prior to issuance of the first building permit SC 12-2
for each building with attached units, or prior
to issuance of a building permit for each
detached building.

Schools
Project Design Features
Prior to the approval of the first tentative PDF 12-1
tract or parcel map in Development Area 3.

Existing Regulations & Standard Conditions
Prior to the issuance of the first building SC 12-3
permit.

Water Service
Project Design Features
Prior to approval of each tentative tract or
parcel map.

Mitigation Monitoring Program No. 137
PDF 12-2
Prior to issuance of the first building permit for each building with attached Planning Department units, or prior to issuance of a building permit for each detached building, the property owner/developer shall pay the Police Facilities Capital Improvement Fee in effect at the time of issuance of the building permit; or, if the fee has not been adopted at the time of issuance of the first building permit, the payment of an amount estimated by the City of Anaheim Police Department to be the approximate fair share attributable to the project for police services.

Prior to the approval of the first tentative tract or parcel map in Development Planning Department Area 3, the map shall provide for a minimum 10-acre site reserved for the purchase and construction of an elementary school by the Orange Unified School District. The property owner/developer shall provide the Planning Department with adequate proof that, in defining the boundaries of the school site area, the property owner/developer has complied with the provisions of the School Impact Mitigation Agreement (Appendix K of the Draft EIR) dated December 16, 2004 between Irvine Community Development Company and the Orange Unified School District, or any subsequent agreement entered into between the property owner/developer and the Orange Unified School District.

The property owner/developer has entered into a School Impact Mitigation Planning Department Agreement (Appendix K of the Draft EIR) with the Orange Unified School District in order to mitigate impacts to the school district associated with the Mountain Park development. This Mitigation Agreement fully mitigates any impacts to the school district in compliance with SB 50. Evidence that this agreement has been executed shall be submitted to the Planning Department prior to the issuance of the first building permit, or fees shall be paid in compliance with SB 50, prior to the issuance of each building permit.

The Mountain Park Specific Plan includes a Water System Sub Area Master Public Utilities Plan (SAMP) (refer to Exhibit 3-11 of the Draft EIR included in Attachment Department A). Prior to approval of each tentative tract or parcel map, the property owner/developer shall submit water improvement plans prepared in conformance with the SAMP to the Public Utilities Department for review and approval. The property owner/developer shall extend and construct the necessary water lines, pump stations, and reservoirs to serve development phases prior to connecting to the City's water system.
33 -
- - - - - - -
Timing
Prior to approval of landscape plans. PDF 12-3
Existing Regulations & Standard Conditions
Prior to approval of tentative tract or parcel SC 12-4
maps.

Prior to final building and zoning inspections. SC 12-5 Mitigation Monitoring Program No. 137
- - - .. - - - -
Irrigation systems within the Mountain Park Specific Plari area shall be Public Utilities controlled by automatic programmable irrigation controllers that utilize Department, Water California Irrigation Management System (CIMS) Data to adjust water times Engineering Division and durations based on daily evapotranspiration) data. Prior to approval of landscape plans, the property owner/developer shall provide verification in the form of notes on the plans to the Public Utilities Department, Water Engineering Division, that the irrigation system is in conformance with the system identified in the SAMP. Public Utilities Department shall confirm that it is in conformance with the irrigation system identified in the SAMP.

Community wide irrigation control shall be provided by a centralized irrigation control system designed to separately valve hydrozones based on plant water requirements, exposure and terrain characteristics. All systems shall utilize matched precipitation rate nozzles and emitters for precise water application, adjustable low angle nozzles to reduce overspray, check valves to reduce low head drainage, and master valves to minimize water loss in the event of a line break or valve malfunction.

In accordance with the requirements of SB 221, prior to approval of tentative Public Utilities tract or parcel maps, the property owner/developer shall request that the Department Public Utilities Department provide water verification studies confirming that sufficient water supply is available for the proposed uses, in compliance with the approved Water Supply Assessment prepared for the project.

Prior to final building and zoning inspections, the property owner/developer Public Utilities shall demonstrate to the Public Utilities Department that water consumption Department reduction measures have been implemented as required by State law in accordance with the Water Utilities Rates, Rules and Regulations. Where appropriate, plans submitted for building permits shall include notes on plans that indicate the measures that will be utilized to reduce water consumption.

Such measures where feasible and appropriate shall include, but are not limited to:
a. Low-flush toilets and urinals (Health and Safety Code Section 17921.3); b. Maximum flow rate of all new showerheads, lavatory faucets, and sink faucets (Title 20, California Code of Regulations Section 1604[f]); c. Appliances certified by manufacturer to comply with regulations established by applicable efficiency standards (Title 20, California Code of Regulations Section 1606[b]); ·
d. Public lavatories equipped with self-closing faucets that limit the flow of hot water (Government Code Section 7800);
e. Hot water pipes insulated to reduce water used before hot water reaches equipment or fixtures (Title 24, California Code of Regulations Section 2- 5352[i] and 0]);
f. Conservation reminders posted in rooms and restrooms; g. Thermostatically controlled mixing valve for bath/shower; and h. Implementation of efficient irrigation systems to minimize runoff and evaporation.
34 - -
- - - - -
Mitigation Measures
Prior to the issuance of the first building
permit.

Prior to approval of street improvement
plans.

Prior to approval of the first utility or
infrastructure plan serving each
development area with impacts to public
streets.

Sanitary Sewer
Project Design Features
MM 12-1
MM 12-2
MM 12-3
Prior to approval of the sewer improvement PDF 12-4
plans.

Mitigation Monitoring Program No. 137
- -·- - - - - - -
·Responsible for
, Mc>ntttinng '
Prior to the issuance of the first building permit, the property owner/developer Public Utilities shall pay the Public Utilities Department a proportionate share of a water Department supply source to meet the projected increases in water demands in accordance with Rule 15.C, Section 3, of the Public Utilities Rates, Rules, and Regulations. Although the Water Supply Assessment (Appendix M of the Draft EIR No. 331) concludes that there is adequate capacity to serve the proposed project, an additional water supply source will ensure that there is no loss of redundancy and/or reliability to the city water supply system.

Prior to approval of street improvement plans, the property owner/developer Department of Public shall submit Traffic Management Plans to the City of Anaheim Department of Works Public Works and Yorba Linda Public Works Department for proposed street improvements within the respective jurisdictions for review and approval. The Traffic Management Plans shall describe traffic control measures that shall be implemented to maintain traffic flow in all directions where utility improvements are being implemented in existing roadways. Said traffic management measures shall be implemented on-going during road construction, and may include flagmen, appropriate signage and traffic control barriers consistent with City of Anaheim requirements.

Prior to approval of the first utility or infrastructure plan serving each Department of Public development area with impacts to public streets, the property owner/ Works developer shall submit a utility layout and trenching plan to the Department of Public Works for all existing public streets. Trench replacement shall, at a minimum, conform to Public Works Standard Detail No. 132. Joint trenches shall be used whenever practicable. The asphalt pavement restoration widths shall be approved by the Department of Public Works based on anticipated impact of construction and layout of trenches within the public right-of-way.

The Public Facilities Plan provided in the Mountain Park Specific Plan Department of Public includes a Project Sewer Study that identifies the sanitary sewer facilities to Works be constructed with the project. The project sanitary sewer system is shown on Exhibit 3-12 of the Draft EIR included in Attachment A. The property owner/developer shall conduct sewer monitoring at two similar developments within the City to collect 14 days of data during dry weather conditions to verify the sewage generation rates. The property owner/developer shall then prepare a report based on the City approved sewer modeling software to verify that the sewer sizes conform to those proposed in the project sewer study. Prior to approval of the sewer improvement plans, the property owner/developer shall submit plans to the Department of Public Works, demonstrating that the sanitary sewer system is in conformance with the alternatives described in the Project Sewer Study included in the Mountain Park Specific Plan. The property owner/developer shall extend and construct the necessary facilities, including sanitary sewer lines to serve the project development phases.
35 - -
- - - - - - - - - - -- - - - - - - -
·.);:1"\Iti:1,fft:iiif4;i,\t:t~;'.,)•';,){j\;fi'lFil~:\'.:1\;,.'. •····••.•·. ,,fr:,:iji~~t~ · · .... U! · .
··•·.··:•i~:11ti~:J::f'fi-•.·;_ fc~i~i~tibh
,'..·'.·'
. ·. \; Timing
•••• . ) >'l. ,<. ••. , . . ; y ·.· .. , . . . ... •
Existing Regulations & Standard Conditions
Prior to issuance of each building permit. SC 12-6 Prior to issuance of each building permit, the property owner/developer shall Planning Department pay fees for sewer service to the City of Anaheim and Orange County Sanitation District.

Prior to approval of final tract or parcel SC 12-7 Prior to approval of final tract or parcel maps, the property owner/developer Planning Department maps. shall pay the appropriate sewer connection fee to the City of Anaheim, as established by City Council Resolution.

Mitigation Measures
Prior to approval of the first final tract or MM 12-4 Prior to approval of the first final tract or parcel map in Development Areas 1, Department of Public parcel map in Development Areas 1, 2, 4 2, 4, or 5, the property owner/developer shall obtain approvals, permits, Works or 5. and/or easement rights of way from private property owners and affected jurisdictions (City of Yorba Linda, Caltrans, Orange County Sanitation District) for off-site sanitary sewer line connections. Evidence that these approvals and permits have been obtained shall be submitted to the Department of Public Works.

Prior to approval of the first final tract or MM 12-5 Prior to approval of the first final tract or parcel map in Development Areas 3 Department of Public parcel map in Development Areas 3 and 7. and 7, the property owner/developer shall submit sewer improvement plans Works for the West Basin sewer alignment from the alternatives presented in the Project Sewer Study. The Department of Public Works shall select the West Basin sewer alignment based upon the ability of the property owner/ developer to obtain off-site easements, and any design limitations related to the SR-241 over-crossing and/or other construction related issues.

Prior to the first final tract or parcel map in MM 12-6 Prior to the first final tract or parcel map in Development Areas 1, 2, 4, 5, and Department of Public Development Areas 1, 2, 4, 5, and 6. 6, the property owner/developer shall submit sewer improvement plans for Works the East Basin sewer alignment from the alternative presented in the Project Sewer Study. The Department of Public Works shall select the East Basin sewer alignment based upon the status of the Santa Ana River Interceptor (SARI) relocation project.

Electricity
Project Design Features
Prior to approval of permits for improvement PDF 12-5 The Public Facilities Plan provided in the Mountain Park Specific Plan Public Utilities plans. identifies the electrical facilities to be constructed with the project. The project Department, Electrical electric system is shown on Exhibit 3-13 of the Draft EIR included in Engineering Division Attachment A. Prior to approval of permits for improvement plans, the property owner/developer shall submit electric system plans to the Public Utilities Department, Electrical Engineering Division, demonstrating that the electric system is in conformance with the Public Facilities Plan included in the Mountain Park Specific Plan. The property owner/developer shall extend and construct the necessary facilities, including electric lines identified in Exhibit 3-13 of the Draft EIR (included in Attachment A), to serve development phases.

Mitigation Monitoring Program No. 137 36
- - - - - -
Timing
Existing Regulations & Standard Conditions
Prior to approval of final tract or parcel SC 12-8
maps.

Prior to issuance of building permits. SC 12-9
Prior to issuance of the first building permit SC 12-10 for each tentative tract or parcel map.

Prior to issuance of each building permit. SC 12-11
Mitigation Measures
Prior to approval of street improvement
plans.

Mitigation Monitoring Program No. 137
MM 12-7
- - - - - - - - - -- - -
. . ,~esponslbte .to(
·. · , >:Morilt6r1rlt,:,;</ ' ,'.coinp1~tic;fi
Prior to approval of final tract or parcel maps, the property owner/developer Public Utilities shall install, bond for, or otherwise secure on-site electrical facilities in Department accordance with the City of Anaheim Public Utility Electric Rates, Rules and Regulations, and provide written evidence of this fact to the Public Utilities Department.

The proposed project shall comply with all State Energy Insulation Standards Public Utilities and City of Anaheim codes in effect at the time of application for building Department permits. (Commonly referred to as Title 24, these standards are updated periodically to allow consideration and possible incorporation of new energy efficiency technologies and methods. Title 24 covers the use of energy efficient building standards, including ventilation, insulation and construction and the use of energy saving appliances, conditioning systems, water heating, and lighting.) Plans submitted for building permits shall include written notes demonstrating compliance with energy standards and shall be reviewed and approved by the Public Utilities Department prior to issuance of building permits.

Prior to issuance of the first building permit for each tentative tract or parcel Planning Department map, the property owner/developer shall pay fees in accordance with Anaheim's Electric Rates, Rules and Regulations for electrical residential and commercial services for specific uses within the development site.

Prior to issuance of each building permit, the property owner/developer shall Public Utilities incorporate the following energy saving practices into building plans. The Department property owner/developer shall implement, to the extent feasible, these energy saving practices, in compliance with Title 10 of the Anaheim Municipal Code, prior to each final building and zoning inspection:
a. Consultation with the Public Utilities Department energy conservation experts for assistance with energy conservation design features. b. Use of electric motors designed to conserve energy.
c. Use of special lighting fixtures such as motion sensing light switch devices and compact fluorescent fixtures in place of incandescent lights. d. Use of T8 lamps and electronic ballasts. Metal halide or high-pressure sodium for outdoor lighting.

Prior to approval of street improvement plans, the property owner/developer Department of Public shall submit Traffic Management Plans to the Department of Public Works Works, Traffic describing traffic control measures that shall be implemented to maintain Engineering Division traffic flow in all directions where utility improvements are being implemented in existing roadways. The traffic control measures may include flagmen, appropriate signage and traffic control barriers consistent with City of Anaheim requirements, or other appropriate measures. The Traffic Management Plans shall be reviewed and approved by the Department of Public Works, Traffic Engineering Division.
37 - - - - --------- - - - - - - -
Prior to approval of grading plans, final tract MM 12-8 or parcel maps, or street improvement
plans, whichever occurs first, for
Development Areas 3 and 7.

Prior to approval of grading plans, final tract
or parcel maps, or street improvement
plans, whichever occurs first, for
development areas east of SR-241.

Prior to issuance of the first building permit
for each tentative tract or parcel map.

Natural Gas
Project Design Features
MM 12-9
MM 12-10
Prior to approval of grading plans, final tract PDF 12-6 or parcel maps, or street improvement
plans, whichever occurs first.

Existing Regulations & Standard Conditions
Prior to approval of final tract or parcel SC 12-12
maps.

Mitigation Monitoring Program No. 137
.·· .··•· Responsibte,f<>r:,
' . ;Mdnit<>tlng ....

Prior to approval of grading plans, final tract or parcel maps, or street improvement plans, whichever occurs first, for Development Areas 3 and 7, the property owner/developer shall submit preliminary electric system plans to the Public Utilities Department for review and approval. The property owner/developer shall request that the Public Utilities Department provide engineering standards and plans for the installation of electrical and communication conduit and substructures systems. The property owner/ developer shall also submit an electrical and communications conduit phasing plan to the Public Utilities Department to assist in the planning of additional electrical distribution systems from the Park Substation to, and within, Development Areas 3 and 7.

Prior to approval of grading plans, final tract or parcel maps, or street improvement plans, whichever occurs first, for development areas east of SR-241, the property owner/developer shall submit preliminary electric system plans to the Public Utilities Department for review and approval. The property owner/developer shall request that the Public Utilities Department provide engineering standards and plans for the installation of electrical and communication conduit and substructures systems from the Park Substation to, and within, development areas east of SR-241.

Prior to issuance of the first building permit for each tentative tract or parcel map, the property owner/developer shall pay fees and provide the necessary infrastructure for the installation of the on-site and off-site electrical and communication systems to serve said tract, designed and phased to provide electrical service for the development areas within the project site. This shall include line extensions from the Park Substation to the development site.

The applicable improvements shall be installed prior to the first final building and zoning inspection for the tract or parcel map.

Public Utilities
Department
Public Utilities
Department
Planning Department
The Public Facilities Plan provided in the Mountain Park Specific Plan Public Utilities identifies the natural gas facilities to be constructed with the project. The Department project natural gas system is shown on Exhibit 3-13 of the Draft EIR (included in Attachment A). Prior to approval of grading plans, final tract or parcel maps, or street improvement plans, whichever occurs first, the property owner/developer shall submit plans to the Public Utilities Department demonstrating that the natural gas system is in conformance with the Public Facilities Plan included in the Mountain Park Specific Plan.

The property owner/developer shall extend and construct the necessary facilities, including natural gas lines to serve development phases.

Prior to approval of final tract or parcel maps, the property owner/developer Public Utilities shall install, bond for, or otherwise secure on-site natural gas facilities in Department coordination with Southern California Gas Company (SCG). Written evidence of this shall be provided to the Public Utilities Department. 38 . . .. ··•
,Compl(tfioh.
- - -----·--- - - - - - - - - -
Timiilg ·· ···l61;,,::ti\\A::J:x;A:;c·0•Jt1:;'{;\:? ·· · •·•'•/L.'Il-,Jic., .•.• ,· · ::~~:roi1t~rr~•l 0 ?•/:: /c~~:pl~ilbi{ ' .·· •'' ....... " ; ' , .. ·· .> ·• .. .. . ··,, Solid Waste
Existing Regulations & Standard Conditions
Prior to approval of any site plans, tentative SC 12-13 Prior to approval of any site plans, tentative tract or parcel maps, the Department of Public tract or parcel maps. property owner/developer shall submit a Solid Waste Management Plan with Works, Streets and recycling capabilities to the Department of Public Works, Streets and Sanitation Division Sanitation Division for review and approval. Refuse collection and disposal for the proposed project shall comply with AB 939, the County of Orange Integrated Waste Management Plan, and the City of Anaheim Integrated Waste Management Plan.

Library Services
Existing Regulations & Standard Conditions
Prior to approval of any final tract or parcel SC 12-14 Pursuant to Resolution No. 89R-235 adopting the Public Library Facilities Planning Department, map, or prior to issuance of a building Plan for the East Santa Ana Canyon area, as may hereinafter be amended, Building Division permit where no subdivision is involved. the property owner/developer shall pay required fees for the construction of library facilities in the East Hills Planned Community. Fees shall be paid as a condition of approval of any final tract or parcel map, or prior to issuance of a building permit where no subdivision is involved. The Planning Department, Building Division shall verify payment of fees.

SECTION 4.13- RECREATION
Project Design Features
Prior to approval of each tentative tract or PDF 13-1 The Mountain Park Specific Plan includes the implementation of the public Community Services parcel map that the trail is located within. Gypsum Canyon Creek Regional Riding and Hiking Trail (refer to Exhibit 3-8 Department of the Draft EIR, Open Space, Trail and Bikeway Plan). Prior to approval of each tentative tract or parcel map that the trail is located within, the final alignment and final design for the Gypsum Canyon Creek Regional Riding and Hiking Trail shall be reviewed and approved by the Community Services Department and County of Orange Harbors, Beaches and Parks Department and shown on the tract or parcel map. An offer of dedication of trail easements to the County of Orange shall occur concurrently with recordation of final tract or parcel maps. Trail improvements shall be completed prior to final building and zoning inspections for the first building within said tracts.

Prior to approval of each tentative tract or PDF 13-2 The Mountain Park Specific Plan includes the implementation of Class II Department of Public parcel map that includes these bikeways. bikeways (on-street, striped) along the following roadways: proposed Works Mountain Park Drive; extension of Weir Canyon Road within the project site; Gypsum Canyon Road from off-site Featherly Regional Park to on-site Mountain Park Drive; and Santa Ana Canyon Road within the project site (refer to Exhibit 3-8 of the Draft EIR, Open Space, Trail and Bikeway Plan).

Prior to approval of each tentative tract or parcel map that includes these bikeways; the property owner/developer shall include provisions for these bikeways on the tract or parcel map. The final alignment and final design of each bikeway shall be shown on the street improvement plans and shall be reviewed and approved by the Department of Public Works.

Mitigation Monitoring Program No. 137 39
- - - - - -
·•··Timing
Existing Regulations & Standard Conditions
Prior to. or concurrent with, approval of final SC 13-1 tract or parcel maps in Development
Area 3.

SECTION 4.14- CULTURAL RESOURCES
Mitigation Measures
Prior to the approval of a grading plan or
issuance of a building permit, whichever
occurs first.

During the conduct of ground-disturbing
activities.

Mitigation Monitoring Program No. 137
MM 14-1
MM 14-2
- - - - - - - - - -
The Mountain Park Specific Plan includes an approximate 15-acre improved Planning Department park in Development Area 3 (refer to Exhibit 3-4 of the Draft EIR) to fulfill the City's park dedication requirement. Prior to, or concurrent with, approval of final tract or parcel maps in Development Area 3, the property owner/ developer shall demonstrate compliance with this park dedication requirement to the Planning Department.

Prior to the approval of a grading plan or issuance of a building permit, Department of Public whichever occurs first, the property owner/developer shall retain a County- Works, and certified archaeologist (project archaeologist) and submit written confirmation of this to the Department of Public Works. The project archaeologist shall Caltrans (for grading observe grading activities and recover, catalogue, analyze, and report within Caltrans right­ archaeological resources as necessary in the previously undeveloped of-way) portions of the development area. The project archaeologist shall be present at the pre-grade conference. The project archaeologist shall submit to the Planning Department, and Department of Public Works, Development Service Division, a written plan with procedures for archaeological resource monitoring. For work within Caltrans right-of-way the plan shall be submitted for review by Caltrans Cultural Resources staff. This plan shall include procedures for temporarily halting or redirecting work to permit the sampling, identification and evaluation of the resources as appropriate, and a requirement that a Native American monitor retained by the property owner/developer be present during any required excavation. If the archaeological resources are found to be significant, the project archaeologist shall determine appropriate actions-in cooperation with the City of Anaheim or Caltrans, if within Caltrans right-of-way-for exploration and/or data recovery to adequately recover the scientifically significant information from or about the archeological resource. The project archaeologists shall prepare any excavated material to the· point of identification. Following the completion of grading, the archaeologists shall prepare a report detailing the results of the monitoring program to be presented to the City of Anaheim Planning Department. The report shall follow guidelines of the California Office of Historic Preservation (1990).

Excavated finds shall be accessioned into a qualified scientific institution that meets, or exceeds, the requirements of 36CFR79.

If human remains are encountered during the conduct of ground-disturbing Planning Department activities, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition of the materials pursuant to Public Resources Code Section 5097.98. The County Coroner must be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner would notify the Native American Heritage Commission (NAHC). The NAHC would determine and notify a Most Likely Descendent (MLD). The MLD may inspect the site of the discovery with the permission of the property owner/ 40 -
- - - - - -
·riming··
Prior to issuance of the first grading permit. MM 14-3
Mitigation Monitoring Program No. 137
- - - - - - - - - -
developer or his/her authorized representative. The descendent must complete the inspection within 24 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials. -
Prior to issuance of the first grading permit, the property owner/developer Department of Public shall submit a monitoring plan, prepared by an Orange County certified Works, Development paleontologist to the Department of Public Works, Development Services Services Division Division that ensures that the following actions are implemented:
a. The area west of Gypsum Canyon is comprised almost entirely of the Topanga Formation (high paleontological sensitivity) and contains all of the heretofore recognized surface occurrences of fossils on the project site. The north-central portion of the project site is comprised chiefly of the interbedded undifferentiated Vaqueros and Sespe Formations (moderate to high paleontological sensitivity) and smaller elements of the Sespe, Santiago, and Topanga Formations (all high paleontological sensitivity). Paleontological monitoring in the western and north-central areas of the project site shall be conducted on a full-time basis and shall be identified as such in the monitoring plan. It shall be the responsibility of the project paleontologist to show, to the satisfaction of the City, the recommended limits of full-time monitoring on the tentative tract or parcel map level grading plans, when available. Because of the potential for identifying microfossils or small fragments of macrofossils, periodic screening of sediments from cuts in these formations shall be carried out by the project paleontologist. Such material may be removed in bulk and screened off-site to minimize interference with grading operations.
b. The Holz Shale, Schulz Ranch Member of the Williams Formation, the Silverado Formation, Santiago Formation, and the Sespe Formation, exposed primary east of Gypsum Canyon, shall be monitored as determined necessary by the project paleontologist during grading operations. Recommended hours for monitoring activities shall be established by the project paleontologist and shall be outlined in the monitoring plan. It shall be the responsibility of the project paleontologist to demonstrate, to the satisfaction of the City, the appropriate level of monitoring necessary based on the tentative tract or' parcel map level grading plans, when available. Because of the potential for identifying microfossils or small fragments of macrofossils, periodic screening of sands from cuts in these units shall be done by the project paleontologist monitor. Such material may be removed in bulk and screened off-site to minimize interference with grading operations.

C. Any paleontological work at the site shall be conducted under the direction of a County of Orange Certified paleontologist (project paleontologist).
41 - -
- - - -
Timing.·
Mitigation Monitoring Program No. 137
- - - - - - - - -
d.
e.

If a fossil discovery occurs during grading operations when the project paleontologist is not present, grading shall be diverted around the area until the monitor can survey the area, and/or Caltrans Cultural Resources staff can inspect the site; if the resources are found within Caltrans right-of-way.

Any fossils recovered during the development, along with their contextual stratigraphic data, shall be donated to the County of Orange, or other appropriate institution with an educational and research interest in the materials. A final 'report detailing findings and disposition of specimens shall be prepared by the project paleontologist and submitted to the City of Anaheim Planning Department upon completion of grading.
42 - - - -
I
I
I
I
I·
I
I
I
I
I
I
I
I
I
I
I
I
I
I

ATTACHMENT A
EIR NO. 331 EXHIBITS APPLICABLE TO

MITIGATIONMONIITORING PLAN
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
--.. .... c,-,,, .... r Of ....
,,,,,.,,.u., .. .,. e,,,,
Legend
Low-Med,um Hill,. de Den,ily Re<oden1ial (up to 6 DU/AC) low-Medium Density Residen 1,al (up 10 16 DU/ACI
c==l Open Space
lnstilutiOndl
School
Fire S1a1ion
Community Park
Tr•ilhead I S1aging ar~a lpublicl
Pri,•a1e Neighborhood Park
Priv.ate Recrl'ation Center
Development Plan
DA 5
RMP-4
@
0 Developme n1 Area
Implementation Zone
Toll R0'1d Ovcrcro:-!-ing
Toll Road ln1e,change
City oi Anaheim Lin,i1s
Mountain Park Specific Plan Amendment EIR No. 331
Source :

ENGINEERING Not To Scale
--------.

I
I
I
I
I
I
I
I
,--, . ,•-. ' .. , ___ i
I <,. "') 1•, \ ~. ,' : , ___ ,
I -.. ,•
.. , ', --' ', ', ',~ ",: , .... ,, ' , ..

I
I ,
~----,-,
Exhibit 3-4
March 11, 200S
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-----.... .... ....
-..

Legend
CJ
L:=J
-CJ
c=J
CJ
Other Open Spoce (310 Acres)
NCCP/HCP Reserve (Noturol Co.'Tlmuni11es Conservation
Plon/ Hcb,tot Con,e,votlon Pion (940 ocres)
TNC ACE [The NoMe Conse,voncy Anohe,m
ConseNohOf'li Eo.semen1l {9 l 3 ccre.s)
lnsfi1u1ionol
Low-Medium Density Resider111ol
Oty of Anaheim Limlis
_. Proposed R1d1ng. Hiking, Pedesinon and
Mounrom 81ke Tro1I·
• • • • • • Ei.1shng Re91onol Riding & H,1cmg Tro,1
Proposed On-Rocd C,ry S,, ewoy (Closs 11)
, - - - I Eusting O n-Rocd 8,kewoy (Closs II)
& T roilheod / Stog,ng Aleo
,-,
1 , Exisflng Undercrossings ,_,
0 Proposed Riding & 1-i,king Tta,1 Undercrossings
rn School
® Fire S10t1on
A, Community Pork
@ Toll Rood Ovorcrossing
0 Toll Rood lnrerchange
Total Open Space Acres = 2, 163 • Referred :o os Pioposed Ragio11af ,'1,d,ng & Hikmg l'orl par Coun,.,. Sfondards Open Space, Trail & Bikeway Plan Revised Exhibit 3-8
Mountain Pork Specific Pion Amendment EIR No. 331
June 10, 200S
Source:

ENGi HEE ~ING Not To Sca le
11 I
I
11 I
LEGEND
.. .. ..

SANTA ANA

PROJECT BOUNOAAY
WATER OOALITY BAS~S
(MAINTENANCE AL.LO'h'EO)
Rl:STORATION" AFl:EA
(NO MAl."IITENANCE Al LOWED)
PAOAAE.A
lANOSCAPEO
MANUF ACnJrtEO SlOPES
PRO POSSO CAL TR.ANS
WATER OUAt.lTY F"ACU.ITV
I
Proposed Drainage System
PRO?OSED DRAINAGE SOUNOARY
VEGETATED DRAINAGE. SWAI.E
PROPOSED HtGH FLOW STORM DRAIN
PROPOSED BYPASS STORM OFlAtN
PR.0?0S5.0 LOW FLOW STORM DRAIN
• ENERGY OlSSl?AiOR
- - - - - - - •.. GYPSUM CANYON CREEK & TRISUTARY FLOW UNES Mountain Pork Specific Pion Amendment EIR No. 331
, --------."-----­,.,
_,-; ...
• >'· j~ ,,,.-
,.
- Cit)' OF AN.t.HE111.l UMITS
----1►- F'LOWUNES
- - - - - EXISTINGSTOFtMORAIN
,..
i' '¾
.-~~ ..

Exhibit 3-9
Morch 11, 200,
, -
I
I
I
I
II
I
I
I
I
I
I
I
I
I
1/,
Watershe d Key Map
L-_, &~0q~•~ ar,,
Otalna~tO
CJ E
:::::::1' CJ• O w
/ /
Treated py '
WQBa .
~ . //
Fire Stationrr ail
Map,· Rut\ON Management Plan, Fuscoe Eng1nettflg . 200• Legend
0 Water Quality Basin
• Water Tank
===~ City of Anahem Limits
----- Mountain Par!< Project Site
D Drainage Boundary
LJ WQ Basin Treated Area
LJ WQ Basin \ Bio-swale Treated Area
~ Filter Strip \ Bio-swale Treated Area
Proposed Water Quality Implementation Plan
Mountain Pork Specific Plan Amendment EIR No. 331
Source :

E~Gltl EERIIIG ~ SCALE: 1 • = 2000'
Proposed Land Use Type
D Man-Made Slope
- Street
- Park
c:] sFD
O schoo l
Exhibit 3-10
March 11, 2005
I
II
I
11 ii
11 II
I
ii
II
11 I
jl
ii
I
I
l egend
Low-Mrdium Hillside Den,ity Re:.1dentic1I
e Re~r.,oir
-
Low-,\.1edium Density ResidcntiJI 0 \Vatcr Pump StJtion c:J Open Space
•
Connection 10 E'<1sting Facility
Institutio nal ill School
DA Development Arca ® Fire Station
P,oposed \•Vater M Jll"1 Lin<" Lb. Community Park
----- E~isting \V"1ter ~·1\1in Line ------ Cil)' of Anahein, Limh, Water System Plan
Mountain Park Specific Plan Amendment EIR No. 331
Source ;
'1 ii= EHGIHHR IHG Not To Scale
-----.. --.

I
I
I
I
I
I
I
1-• I
.-, ' '°• I
NOTE:

I (.. 1•, ._., 11••• ', ,' : .. __ _
I '• ,
f._, ' .. ·--
', 'a '", '. .,_,, ... ..,,,
I
I ,
-­,,----

THIS IS A GRAPHIC REPRESENTATION OF A PLANNING
ENGINEERING CONCEPT. FINAL DESIGN SOLUTIONS
AND PRECISE LOCATION FOR THESE FACILITIES Will BE

PROPOSED AND REVIEWED AS PART OF SUBSEQUENT
PLAN APPROVAL.
730 Zone
900 Zone
- -i........=s.lliU 900Zone
~~ ~
11til" __ 4~i:- 11 20 Zone
@ Toll Road Overcrossing
Q Toll Road Interchange
Exhibit 3-11
March 11, 2005
I
I
I
I
I
I
I
I
I
CON1eet1on 10 SARI lne
1"\Sc'J\Roncl'l
-- --------------.. .... .... .... ....

Lege nd
DA
Lmv•Medium Hillside Density Restdenual
Low•Med,um Oermty Rt.?S1dentr.1I
Open Spac~
lnst1rut1on.1l
Developmeno ArN
Sanitary Sewer System Plan
◄
---
Direction oi Flow
Sewer line
Off-Sile Sewer ,\.1.:,in
Opt ional Sewer Linc Corrncc11on
fx1~1ing S.A.R.I, Trunk Sewci
£xi5ting. Sewer Lmc
Upgrade Existing Sewer ro 10"
Mountain Pork Specific Plan Amendment EIR No. 331
Source :
f NG IHEERING Not To Sca le
--------~ I
' ' I
I
I
' I
-•, I
r-:., ', , ____ J
I I 1•, ' '• , : .. __ .,
I '• ""'
.... , ... ·--, ', ', ', \ ,~,, ...... ,,'
' I ,
,-----_,
NOTE,
THIS IS A GRAPHIC REPRESENTATION Of A PLANNING
ENGINEERING CONCEPT. FINAL DESIGN SOLUTIONS
AND PREOSE LOCATION FOR THESE FACILITIES Will BE
PROPOSED AND REVIEWED AS PART Of SUBSEQUENT
PIAN APPROVAL.

School
Fire S1a1ion
Communiry Park
Toll RoJcl Ovcrcrossing
Toll Road Interchange
Ciry or Anaheim L,milS
Exhibit 3-12
Marc h 11, 200 5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Legend
DA
Low-lol1cdium Hillside Density Residenrial
low-Medium Density Res1denttal
Open Sp3ce
lnsutur100JI
Develop<nenr Area
Dry Utilities Plan
::,
--------.

I
I
I
I
I
I
I
~-, 1
--.. c '""' I I ~-, •, '-, -••-
~. ,' •' ,._ __ ,
I •1 ,t
... ,, ',, --,,
' , ~ \ <,,, .... , ,
I
• , ,. ,---,
THIS IS A GRAPHIC REPRESENTATION Of A PLANNING
ENGINEERING CONCEPT. flNAl DESIGN SOLUTIONS
ANO PRECISE lOCATION FOR THESE FAClllTIES Will BE

PROPOSED ANO REVIEWED AS PART OF SUBSEQUENT
PIAN ;.PPROVAL
Quesiar Pipeline
Proposed Main Gas Pipe
Proposed Telephone / Cable
Existing Circuir in Existin,s Ouetbank
Proposed New Circu it in Existing Ductbank
New Electrical Subsratfon being consrrucrcd by Ciry
Propowd Underground 12KV 01striburion Circuir!­
City o( An.iheim limns
School
Fire Station
Community Par!<
Toll Rood Overcrossing
Toll Rood ln1erchange
Exhibit 3-13
Mountain Pork Specific Pion Amendment E/R No. 331
March 1 I , 200S
Source:
fKGIHEERING Not To Scole
- - - -
'
J.£IDQ;
~ !fi:
, Q
.~ I
' S
~
~
~
~
'-E;;!!52S=9-- PIIOl'OSID STOIIM ciR,,,,
-~1!1 - Ql!Aff:,11£1
-~-""' l - cioiiar., ~ /
--~--~-.. -
-
I f
I
' -I I
I
I I
I ,
i
. I
-
I I
I i
; I
-
/ r . ' I I l..
-
I
I
I I'.
... .. .,, -
CR£STVrcw lANE .

I i I ,
I

I I I I
I
' I I
i' i
i i ! I
I ' . I ,
I
/ i
' I I i.

I
l i . I I I
' l
I I

OAK CANYON DRIVE IMPROVEMENTS
Mountain Park Specific Plan Amendment EIR No. 331
CNGIIICCP.ING e, Scale: 1""' 100'
- - - - - - - - - -
\
'
j \
I I
I I I •
I
/ / (
Exhibit 3-17
Mrach 11, 2005
I
I
I
I
I
I
I
I
I
I
I
I
I
'o a.
.,;
0 ("J
0 N
I
0 I
"' ,..:_
i
Q)
/
Q)
0 I
~
'5 0
N
0 7 u
I
~
Q)
·15
it /
oi
I
I
I
OAK
\
\
I
I
\
)
\
\
' \
'>
·(/)
::0
I
"' :!:
~/
------
I
'
I
' '
I
' '
I
' '
I
I
'
(
' '
""' ' '
""' '
""' ""'
The Weir Canyon Road/SR-241 interchange is
anticipated to be funded by the Transportation
Corridor Agency through the use of toll revenues,
corridor fees, and/or reimbursement agreements
with the project applicant (The Itvine Company).

Legend
- - - - Project Site Boundary
••• • •••• New On-Site Local Roadway
• • • • • • • New Arterial Roadway
------- NewTollRoadRamp
Improved Arterial Roadway
♦♦♦♦♦♦ Off-Site Roadway Improvement
e Improved Arterial Intersection
I
'
""'
Proiect-Related Roadway Improvements Exhibit 4.7-5
Mountain Park Specific Plan Amendment EIR No. 331 March 11, 2005 Source:

Austin-Foust Associotes, Inc., 2005
Not To Scale
I
I
I
I
I
I
I
I
I
I
I
I
I
'B
Q.
..;
~
M
I
0 I
"-,;.
i
i
I
;:
:,
6 N
0 :;;,
u ;::

I
~ ,!!.
2 Q.. ,...
~
I
I
I
':~~J~~~~~~~~=~~r~~~
-=-~~ -;_.-::.:,:::-~ \ - -=.::-:--- ~ ..,-::::..,..
'- _":_--f'WP'\ --<J~-- _/,/,:-;,/'·":::
~., r~~~ ~~ .. .... "·. ;-,., ·~
'•, ~ ¥-~ .;,::a-"'.:~..> ... :\, • ...~--
- - , _
......... , , ... _-.;.----~1~ ~
• ......,____ _ ;; 1 ' ~~~~~~~ 'J ',"
.. ,,,: ,.-
.J •• • ... -
... .. ·.;
·- ;_ . ~ .
,•-:.. .. I,.--:>;
- I
-,·.,
:.· ·~·;-·-~·.
- --:-:i
~ Noise Barriet'
_ Benn Included
In Grading Plans
Preliminary Noise Barrier Exhibit 4. 9-7
Mountain Park Specific Plan Amendment EIR No. 331
March 11, 2005
Source:

Mesire G1eve Associoles, 2005
I
I
I
I
I
I
I
I
I
I
I
I
II
11 'u
Q.
.,;
0 -0
;;:;
0 I
I
00 0-...
:l
---" 0
~
I
i N
0 G
11 ~ v
" ·e
<>. .,.,
oi
i
II
I
I
I
,,.
~~Jfr~
~•J•
it - \~
~-- ·-_i··
:_~t;;;:'--;~--:. -. -.se, \:, ·,:,
., • ··,.,; • '1. ~ 1·
\•.\,~ \~,· \ .... ,_,,
~1
- •~ I
~-,~
._i'
Mechanical Ventilation Areas
Mountain Park Specific Plan Amendment EIR No. 331
Source:

Mestre Greve Associates, 2005 r • ~
,._ i
.-
., . . . --;_,,
--~ . ...-:!•'•
·-:;,f ~,.
-;,._. ....
.. ·.{:· ..

Areas Where Residential
- Structures Will Require
Mechanical Ventilation
Exhibit 4. 9-8
Morch l l, 2005
I
I
I
I
11 I
.I
I
I
I
I
I
I
"5 a. .,;
0 "' M
I
0 o-' 0-
i ., _,-
~
I i s
i3
~
I
v ., ·e
~
cii
,,
I
I
,- ' .-1
Interior Noise Analysis Areas
Mountain Pork Specific Pion Amendment EIR No. 331
Source:

Mestre Greve Associates, 2005
' ... ''/.}.~~~;"·,:.,. ·
,,. - •♦:>v..
if
Areas Where Structures Will
-
Require a Detalk,d Analysis of
Outdoor-to-Indoor Noise Reduction
Exhibit 4. 9-9
March 11, 2005
I
I
I
I
I
I
I

ATTACHMENT B
I SCAQMD RULE 403 TABLES
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mestre Greve Associates
Table 15
Mountain Park
Page36
Required Best Available Control Measures (Rule 403 Table 1) Source Category
Control Measure
Backfilling
01-1 Stabilize backfill material when not
actively handling; and
01-2 Stabilize backfill material during
handling;and
01-3 Stabilize soil at completion of activity.

Clearing and Grubbing
02-1 Maintain stability of soil through pre­
watering of site prior to clearing and
grubbing; and
02-2 Stabilize soil during clearing and
grubbi~g activities; and
02-3 Stabilize soil immediately after clearing
and grubbing activities.

Clearing Forms
03-1 Use water spray to clear forms; or
03-2 Use sweeping and water spray to clear
forms; or
03-3 Use vacuum system to clear forms.

Crushing
04-1 Stabilize surface soils prior to operation
of support equipment; and
04-2 Stabilize material after crushing.

Cut and Fill
05-1 Pre-water soils prior to cut and fill
activities; and
05-2 Stabilize soil during and after cut and
fill activities.

Guidance
• Mix backfill soil with water prior to
moving
• Dedicate water truck or high capacity hose
to backfilling equipment
• Empty loader bucket slowly so that no dust
plumes are generated
• Minimize drop height from loader bucket
• Maintain live perennial vegetation where
possible
• Apply water in sufficient quantity to
prevent generation of dust plumes
• Use of high pressure air to clear forms may
cause exceedance of Rule requirements
• Follow permit conditions for crushing
equipment
• Pre-water material prior to loading into
crusher
• Monitor crusher emissions opacity
• Apply water to crushed material to prevent
dust plumes
• For large sites, pre-water with sprinklers or
water trucks and allow time for penetration
• Use water trucks/pulls to water soils to
depth of cut prior to subsequent cuts
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mestre Greve Associates
Table 15 (Continued)
Mountain Park
Page37
Required Best Available Control Measures (Rule 403 Table 1) Source Category
Control Measure
Demolition - Mechanical/Manual
06-1 Stabilize wind erodible surfaces to
reduce dust; and
06-2 Stabilize surface soil where support
equipment and vehicles will operate;
and
06-3 Stabilize loose soil and demolition
debris; and
06-4 Comply with AQMD Rule 1403.

Disturbed Soil
07-1 Stabilize disturbed soil throughout the
construction site; and
07-02 Stabilize disturbed soil between
structures
Earth-Moving Activities
Guidance
• Apply water in sufficient quantities to
prevent the generation of visible dust
plumes
• Limit vehicular traffic and disturbances on
soils where possible
• If interior block walls are planned, install
as early as possible
• Apply water or a stabilizing agent in
sufficient quantities to prevent the
generation of visible dust plumes
08-1 Pre-apply water to depth of proposed • Grade each project phase separately, timed cuts; and to coincide with construction phase
08-2 Re-apply water as necessary to maintain • Upwind fencing can prevent material soils in a damp condition and to ensure movement on site that ~isible ~mis~ions do not exceed 100 • Apply water or a stabilizing agent in feet m any d1rect1on; and · sufficient quantities to prevent the 08-3 Stabilize soils once earth-moving generation of visible dust plumes activities are complete.

Importing/Exporting of Bulk Materials
09-1 Stabilize material while loading to
reduce fugitive dust emissions; and
09-2 Maintain at least six inches of freeboard
09-3
09-4
09-5
on haul vehicles; and
Stabilize material while transporting to
reduce fugitive dust emissions; and
Stabilize material while unloading to
reduce fugitive dust emissions; and
Comply with Vehicle Code Section
23114.
• Use tarps or other suitable enclosures on
haul trucks
• Check belly-dump truck seals regularly and
remove any trapped rocks to prevent
spillage
• Comply with track-out
prevention/mitigation requirements
• Provide water while loading and unloading
to reduce visible dust plumes
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mestre Greve Associates
Table 15 (Continued)
Mountain Park

Page 38 ends

Required Best Available Control Measures (Rule 403 Table 1) Source Category
Control Measure
Landscaping
10-1 Stabilize soils, materials, slopes
Road Shoulder Maintenance
11-1 Apply water to unpaved shoulders prior
to clearing; and
11-2 Apply chemical dust suppressants
and/or washed gravel to maintain a
stabilized surface after completing road
shoulder maintenance.

Screening
12-1 Pre-water material prior to screening;
and
12-2 Limit fugitive dust emissions to opacity
and plume length standards; and
12-3 Stabilize material immediately after
screening.

Staging Areas
13-1 Stabilize staging areas during use; and
13-2 Stabilize staging area soils at project
completion.

Stockpiles/ Bulk Material Handling
14-1 Stabilize stockpiled materials.
14-2 Stockpiles within 100 yards of off-site
occupied buildings must not be greater
than eight feet in height; or must have a
road bladed to the top to allow water
truck access or must have an
operational water irrigation system that
is capable of complete stockpile
coverage.

Guidance
• Apply water to materials to stabilize
Maintain materials in a crusted condition
• Maintain effective cover over materials
• Stabilize sloping surfaces using soil binders
until vegetation or ground cover can
effectively s_tabilize the slopes
• Hydroseed prior to rain season
• Installation of curbing and/or paving of
road shoulders can reduce recurring
maintenance costs
• Use of chemical dust suppressants can
inhibit vegetation growth and reduce future
road shoulder maintenance costs
• Dedicate water truck or high capacity hose
to screening operation
• Drop material through the screen slowly
and minimize drop height
• Install wind barrier with a porosity of no
more than 50% upwind of screen to the
height of the drop point
• Limit size of staging area
• Limit vehicle speeds to 15 miles per hour
• Limit number and size of staging area
entrances/exists
• Add or remove material from the
downwind portion of the storage pile
• Maintain storage piles to avoid steep sides
or faces
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mestre Greve Associates
Table 15 (Continued)
Mountain Park

Page 39 ends

Required Best Available Control Measures (Rule 403 Table 1) Source Category
Control Measure
Traffic Areas for Construction Activities
15-1 Stabilize all off-road traffic and parking
areas; and
15-2 Stabilize all haul routes; and
15-3 Direct construction traffic over
established haul routes.

Trenching
16-1 Stabilize surface soils where trencher or
excavator and support equipment will
operate; and

16.2 Stabilize soils at the completion of
trenching activities.

Truck Loading
Guidance
• Apply gravel/paving to all haul routes as
soon as possible to all future roadway areas
• Barriers can be used to ensure vehicles are
only used on established parking areas/haul
routes
• Pre-watering of soils prior to trenching is
an effective preventiv~ measure.
• For deep trenching activities, pre-trench to
18 inches, soak soils via the pre-trench, and
resume trenching
• Washing mud and soils from equipment at
the conclusion of trenching activities to
prevent crusting and drying of soil on
equipment
17-1 Pre-water material prior to loading; and • Empty loader bucket such that no visible

17.2 Ensure that freeboard exceeds six dust plumes are created inches ( CV C 23114) • Ensure that the loader bucket is close to the Turf Overseeding
truck to minimize drop height while
loading
18-1 Apply sufficient water immediately • Haul waste material immediately off-site prior to conducting turf vacuuming
activities to meet opacity and plume
length standards; and
18-2 Cover haul vehicles prior to exiting the
site.

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mestre Greve Associates
Table 15 (Continued)
Mountain Park
Page40
Required Best Available Control Measures (Rule 403 Table 1) Source Category
Control Measure
Unpaved Roads/Parking Lots
19-1 Stabilize soils to meet the applicable
performance standards;· and
19-2 Limit vehicular travel to established
unpaved roads (haul routes) and
unpaved parking lots.

Vacant Land
20-1 In instances where vacant lots are 0.10
acre or larger and have a cumulative
area of 500 square feet or more that are
driven over and/or used by motor
vehicles and/or off-road vehicles,
prevent motor vehicle and/or off-road
vehicle trespassing, parking and/or
access by installing barriers, curbs,
fences, gates, posts, signs, shrubs, trees
or other effective control measures.

Guidance
• Restricting vehicular access to established
unpaved travel paths and parking lots can
reduce stabilization requirements
I
-I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mestre Greve Associates
Table 16
Dust Control Measures for Large Operations (Rule 403 Table 2) Fugitive Dust Source Category
Control Actions
Mountain Park

Page 41 ends

Earth-moving (except construction cutting and filling areas, and mining operations) ( la) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations each subsequent four-hour period of active operations; OR
( la-1) For any earth-moving which is more than 100 feet from all property lines, conduct watering as necessary to prevent visible dust emissions from exceeding 100 feet in length in any direction.

Earth-moving: Construction fill areas:
(lb) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. For areas which have an optimum moisture content for compaction of less than 12 percent, as determined by ASTM Method 1557 or other equivalent method approved by the Executive Officer and the California Air Resources Board and the U.S. EPA, complete the compaction process as expeditiously as possible after achieving at least 70 percent of the optimum soil moisture content. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations during each subsequent four-hour period of active operations.

Earth-moving: Construction cut areas and mining operations:
(le) Conduct watering as necessary to prevent visible emissions from extending more than 100 feet beyond the active cut or mining area unless the area is inaccessible to watering vehicles due to slope conditions or other safety factors.

Disturbed surface areas (except completed grading areas) (2a/b) Apply dust suppression in sufficient quantity and frequency to maintain a stabilized surface. Any areas which cannot be stabilized, as evidenced by wind driven fugitive dust must have an application of water at least twice per day to at least 80 percent of the unstabilized area.

Disturbed surface areas: Completed grading areas
(2c) Apply chemical stabilizers within five working days of grading completion; OR
(2d) Take actions (3a) or (3c) specified for inactive disturbed surface areas.

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mestre Greve Associates
Table 16 (Continued)
Dust Control Measures for Large Operations (Rule 403 Table 2) Fugitive Dust Source Category
Control Actions
Inactive disturbed surface areas
Mountain Park

Page 42 ends

(3a) Apply water to at least 80 percent of all inactive disturbed surface areas on a daily basis when there is evidence of wind driven fugitive dust, excluding any areas which are inaccessible to watering vehicles due to excessive slope or other safety conditions; OR
(3b) Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface;
OR
(3c) Establish a vegetative ground cover within 21 days after active operations have ceased. Ground cover must be of sufficient density to expose less than 30 percent of unstabilized ground within 90 days of planting, and at all times thereafter; OR
(3d) Utilize any combination of control actions (3a), (3b), and (3c) such that, in total, these actions apply to all inactive disturbed surface areas.

Unpaved Roads
(4a) Water all roads used for any vehicular traffic at least once per every two hours of active operations [3 times per normal 8 hour work day]; OR
(4b) Water all roads used for any vehicular traffic once daily and restrict vehicle speeds to 15 miles per hour;
OR
(4c) Apply a chemical stabilizer to all unpaved road surfaces in sufficient quantity and frequency to maintain a stabilized surf ace.

Open storage piles
(5a) Apply chemical stabilizers;
OR
(5b) Apply water to at least 80 percent of the surface area of all open storage piles on a daily basis when there is evidence of wind driven fugitive dust; OR
(Sc) Install temporary coverings;
OR
(5d) Install a three-sided enclosure with walls with no more than 50 percent porosity which extend, at a minimum, to the top of the pile. This option may only be used at aggregate-related plants or at cement manufacturing facilities.

All Categories
(6a) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified in Table 2 may be used.

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,)
Mestre Greve Associates
Table 17
Mountain Park

Page 43 ends

Contingency Control Measures for Large Operations (Rule 403 Table 3) Fugitive Dust Source Category
Earth-moving
(lA) Cease all active operations;
OR
Control Actions
(2A) Apply water to soil not more than 15 minutes prior to moving such soil.

Disturbed surface areas
(OB) On the last day of active operations prior to a weekend, holiday, or any other period when active operations will not occur for not more than four consecutive days: apply water with a mixture of chemical stabilizer diluted to not less than 1/20 of the concentration required to maintain a stabilized surface for a period of six months; OR
(1B) Apply chemical stabilizers prior to wind event;
OR
(2B) Apply water to all unstabilized disturbed areas 3 times per day. If there is any evidence of wind driven fugitive dust, watering frequency is increased to a minimum of four times per day;
OR
(3B) Take the actions specified in Table 2, Item (3c);
OR
, (4B) Utilize any combination of control actions (lB), (2B), and (3B) such that, in total, these actions apply to all disturbed surface areas.

Unpaved Roads
(lC) Apply chemical stabilizers prior to wind event;
OR
(2C) Apply water twice per hour during active operation; OR
(3C) Stop all vehicular traffic.

Open Storage Piles
(1D) Apply water twice per hour;
OR
(2D) Install temporary coverings.

Paved Road Track-Out
(lE) Cover all haul vehicles;
OR
(2E) Comply with the vehicle freeboard requirements of Section 23114 of the California Vehicle Code for both public and private roads.

All Categories
(lF) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified in Table 3 may be used.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

This page intentionally left blank

A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A

APPENDIX B

APPLICABILITY OF MITIGATION MONITORING PROGRAM NO. 137

TO THE GYPSUM CANYON CEMETERY PROJECT

1 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA

APPLICABILITY OF MITIGATION MONITORING PROGRAM NO. 137 TO THE

GYPSUM CANYON CEMETERY PROJECT
Public Resources Code (PRC) Section 21081.6 (enacted by the passage of Assembly Bill 3180) mandates that where significant effects have been identified, the following requirements shall apply to all reporting or mitigation monitoring programs:
• The public agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval in order to mitigate or avoid significant effects on the environment. The reporting or monitoring program shall be designed to ensure compliance during project implementation. For those changes that have been required or incorporated into the project at the request of a responsible agency or a public agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so requested by the lead agency or a responsible agency, prepare and submit a proposed reporting or monitoring program.
• The lead agency shall specify the location and custodian of the documents or other materials that constitute the record of proceedings upon which its decision is based. • A public agency shall provide measures to mitigate or avoid significant effects on the environment that are fully enforceable through permit conditions, agreements, or othe r
m
easures. Conditions of project approval may be set forth in referenced documents that address required mitigation measures or, in the case of the adoption of a plan, policy, regulation, or other project, by incorporating the mitigation measures into the plan, policy, regulation, or project design.
• Prior to the close of the public review period for a draft environmental document, a responsible agency, or a public agency having jurisdiction over natural resources affected by the project, shall either (1) submit to the lead agency complete and detailed performance objectives fo r
m
itigation measures that would address the significant effects on the environment identified by the responsible agency or agency having jurisdiction over natural resources affected by the project, or (2) refer the lead agency to appropriate, readily available guidelines or reference documents. Any mitigation measures submitted to a lead agency by a responsible agency or an agency having jurisdiction over natural resources affected by the project shall be limited to measures that mitigate impacts to resources that are subject to the statutory authority of, and definitions applicable to, that agency. Compliance or noncompliance with that requirement by a responsible agency or agency having jurisdiction over natural resources affected by a project shall not limit the authority of the responsible agency or agency having jurisdiction over natu ral
re
sources affected by a project, or the authority of the lead agency, to approve, condition, or d
eny projects as provided by this division or any other provision of law.

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
2 MITIGATION MONITORING PROCEDURES
On August 23, 2005, a Final EIR (Mountain Park Specific Plan Amendment Final EIR No. 331 [State Clearinghouse (SCH) No. 2004071098]) was certified by the Anaheim City Council along with the adoption of a Mitigation Monitoring Program (Mitigation Monitoring Program No. 137). This Final EIR, herein referred to as “EIR No. 331” or the “Certified EIR”, identified potentially significant impacts that could be reduced to less than significant levels with incorporation of project design features, Standard Conditions, and mitigation measures.

As stated above, Mitigation Monitoring Program No. 137 (MMP No. 137) was prepared for the Mountain Park Specific Plan No. 90-4, Amendment No. 1 (Approved Project) in compliance with PRC Section 21081.6. It describes the requirements and procedures to be followed by the City of Anaheim (City) to ensure that measures adopted for the Approved Project as certified by the City Council would be implemented and monitored appropriately. This document presents modifications to MMP No. 137 to address the Gypsum Canyon Cemetery Project (Proposed Project).

Because environmental analysis for the Proposed Project has been prepared as an Addendum to EIR No. 331, mitigation included within MMP No. 137 can be utilized to address potential environmental impacts of the Proposed Project. However, the Proposed Project would only affect Development Area 5 (project site) of the Mountain Park Specific Plan Area, while Mitigation Monitoring Program No. 137 addressed the Mountain Park Specific Plan Area in its entirety. As such, mitigation measures, Standard Conditions, and Project Design Features included in MMP No. 137 that do not pertain to the project site, or the currently proposed development type, would not be applicable to the Proposed Project and have been omitted from the modified mitigation monitoring program or have been modified to ensure applicability.

Table 1.A, Applicability of Mitigation Measures Identified in MMP No. 137, lists each of the mitigation measures specified in EIR No. 331 that would be relevant to the Proposed Project and identifies any modifications that would ensure applicability to the Proposed Project.

COMPLIANCE MEASURE MONITORING PROCEDURES
Table 1.B, Applicability of Standard Conditions Identified in MMP No. 137, lists Standard Conditions of approval identified under the Approved Project that would be applicable to the Proposed Project. Table 1.B describes the requirements and procedures to be followed by the City to ensure that all applicable Standard Conditions adopted as part of the Proposed Project will be carried out as described in EIR No. 331 or as modified to ensure applicability to the Proposed Project.

PROJECT DESIGN FEATURE MONITORING PROCEDURES
Table 1.C, Applicability of Project Design Features Identified in MMP No. 137, lists Project Design Features identified under the Approved Project that would be applicable to the Proposed Project.

Table 1.C describes the requirements and procedures to be followed by the City to ensure that all applicable Project Design Features included in the design of the Approved Project will be carried out as described in EIR No. 331 or as modified to ensure applicability to the Proposed Project. 3 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure

3.1 Land Use and Planning
No mitigation measures pertaining to land use and planning were identified in MMP No. 137.

3.2 Landform and Aesthetics
No mitigation measures pertaining to landform and aesthetics were identified in MMP No. 137.

3.3 Geology and Soils
MM 3-1 Prior to the approval of each rough grading plan, the property owner/developer shall submit a site specific geotechnical report prepared by a civil engineer based on recommendations of the preliminary geotechnical reports required under SC 3-3 to the Department of Public Works for review and approval. Site-specific geotechnical studies shall provide specific feasible recommendations for soils engineering, appropriate drains and subdrains in each Development Area, and address the potential for artesian conditions in Development Areas 1 and 2. As part of addressing the potential effects of groundwater on slope stability during future site specific investigations, the property owner/developer shall obtain and provide data from piezometers installed through the alluvium of Gypsum Canyon into the underlying bedrock, near proposed toe of slopes. The piezometers should be monitored for a period of one year to evaluate the potential artesian conditions with consideration for seasonal fluctuations in groundwater elevations.

Mitigation Measure is
applicable to the
Proposed Project,
with the omittance of
the components
specific to
Development Areas 1
and 2.

Department of Public
Works/Planning &
Building Department
Prior to the approval
of each rough
grading plan.

MM 3-2 Prior to the approval of each grading plan, a note shall be added to the grading plan requiring that during grading operations, all grading and earthwork shall be performed under the observation of a registered geotechnical engineer in order to achieve proper sub-grade preparation, selection of satisfactory materials, and placement and compaction of all structural fill. An engineering geologist shall map cut slopes during grading to identify any laterally continuous, adversely oriented, broken or fractured zones that may reduce slope stability. The note shall be prepared to the satisfaction of the Department of Public Works.

Mitigation Measure is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to the approval
of each grading plan.

3.4 Hydrology
No mitigation measures pertaining to hydrology were identified in MMP No. 137.

3.5 Water Quality
No mitigation measures pertaining to water quality were identified in MMP No. 137. 4 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure

3.6 Biological Resources
MM 6-1 Prior to issuance of grading or building permits initiation of construction activities, the property owner/developer shall retain a project biological monitor approved by both the United States Fish and Wildlife Services and California Department of Fish and Game. The project biological monitor shall ensure that all permit conditions are met, all Mitigation Measures are properly implemented, and that the project complies with all Standard Conditions and project design features. The project biological monitor shall also be present during any pre-grade meetings, mass grading operations, and periodically during construction to ensure that sensitive resources designated for preservation are properly protected. Beginning with the initiation of construction or grading activities, the project biological monitor shall submit monthly status reports to the Planning Department to demonstrate compliance with this measure. Additionally, the following construction site housekeeping measures shall be incorporated into all conditions of approval for grading and building permits and compliance verified during construction by the biological monitor.
 To prevent inadvertent entrapment of animals during the construction phase of a project, all excavated, steep-walled holes or trenches more than 2 ft deep shall be covered at the close of each working day by plywood or similar materials. If the trenches cannot be closed, one or more escape ramps constructed of earthen-fill or wooden planks shall be installed. Before such holes or trenches are filled, they shall be thoroughly inspected for trapped animals. In the case of trapped animals, escape ramps or structures shall be installed immediately to allow the animal(s) to escape.
 For the duration of construction activities, all food-related trash items such as wrappers, cans, bottles, and food scraps shall be disposed of in securely closed containers and removed at least daily from the construction site.
 Pets, such as dogs or cats, shall not be permitted on the project site during construction to prevent harassment, injury, or death of wildlife in the project vicinity.

Mitigation Measure is
applicable to the
Proposed Project and
has been augmented
to include additional
provisions and to
reflect updated
timing requirements.

Department of Public
Works/Planning &
Building Department
Prior to the issuance
of grading or building
permits, whichever
takes place first.
5 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
 Use of rodenticides and herbicides in project sites shall be restricted.

This is necessary to prevent primary or secondary poisoning of predators and the depletion of prey populations on which they depend. All uses of such compounds shall observe label and other restrictions mandated by the United States Environmental Protection Agency, the California Department of Food and Agriculture, and other State and federal legislation.

MM 6-2 Prior to the approval of mass or rough grading plans issuance of grading permits impacting jurisdictional areas, the property owner/developer shall provide a wetland mitigation plan approved by the ACOE (for Section 404 areas) and CDFWG (for the Section 1602 areas) to the Department of Public Works. A total of 14.1 acres of riparian mitigation are necessary to offset the loss of ACOE and CDFWG jurisdictional areas as a result of the Proposed Project. A Conceptual Wetland and Riparian Habitat Mitigation Plan has been prepared by LSA (February, 2005). The purpose of the mitigation plan is to:
 Create (establish), restore, or enhance wetland/riparian habitats on site to the maximum extent practicable to minimize the on-site loss of ACOE and CDFWG jurisdictional acreage and function, and provide off-site mitigation for the remainder of the impacts;
 To implement, to the extent practicable, off-site mitigation in the Santa Ana River watershed, as close to the study area as possible or otherwise at a key ecological site;
 To return jurisdictional habitats that are temporarily disturbed during construction to pre-construction conditions; and,
 To ensure that adjacent non-jurisdictional habitats are protected.  The project disturbance limits shall be clearly marked with construction fencing (or other highly visible material), and construction/materials staging and vehicle/equipment maintenance and fueling areas shall be located at least 100 ft away from Gypsum Canyon Channel, where feasible.

Mitigation Measure is
applicable to portions
of the project site
with the potential to
impact jurisdictional
areas and has been
augmented to include
additional provisions
in the wetland
mitigation plan. The
timing requirement
has also been revised.

Department of Public
Works/Planning &
Building Department
Prior to issuance of
grading permits
impacting
jurisdictional areas.
6 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
 To minimize temporary disturbances, all project-related vehicle traffic shall be restricted to established roads, construction areas, and other designated areas.

The preferred on-site mitigation approach shall be approved by the ACOE, CDFWG and RWQCB during the permitting process. One possible component of the on-site mitigation, to address the impacts of the box extension on the already disturbed Gypsum Creek channel, could include a rebuilt creek as a low-flow riparian corridor through the canyon mouth area. Conceptually, the box extension shall act as a high-flow by-pass that efficiently conveys the more intense and destructive flood flows.

The riparian corridor shall extend upstream to the road crossing of Gypsum Creek. The riparian corridor shall consist of a riverine channel flanked by planted embankments. The riverine channel would be soft bottom and the riparian vegetated floor would be nurtured by low and seasonal run-off diverted into it from a channel split from the new box culvert opening. This "splitter" shall consist of a junction opening that becomes a tunnel that would accommodate storm flows as well as wildlife movement under the road crossing to the riparian corridor.

MM 6-3 Prior to approval of mass or rough grading plans a grading permit, the property owner/developer shall submit copies of contractor specifications to the Department of Public Works/Planning & Building Department that include the following note: “Initial clearing of vegetation that has been identified as being used by the southwestern willow flycatcher shall be conducted outside of the breeding season or with the presence of a biological monitor during the breeding season to ensure that no individuals of this species are directly impacted. The breeding season for the southwestern willow flycatcher is between May 15 and July 31.” Following completion of initial clearing of vegetation, the project biological monitor shall provide written evidence to the Planning & Building Department that this measure has been completed.

Mitigation Measure is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to approval
grading permits.

MM 6-5 Prior to approval of street improvement plans for Gypsum Canyon Road, the property owner/developer shall submit copies of contractor specifications to the Department of Public Works/Planning and Building Department that include the following requirements to protect the summer roost of Yuma myotis within the Gypsum Canyon culverts under Mitigation Measure is
applicable to the
portion of Gypsum
Canyon Road
associated with the
Department of Public
Works/Planning &
Building Department
Prior to approval of
street improvement
plans for Gypsum
Canyon Road.
7 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
the 91 Freeway and within Gypsum Creek: (1) construction activities to lengthen the culverts shall be scheduled outside of the critical breeding time (May April 1 through August 1531) to avoid direct impacts; (2) if construction must occur between May April 1 and August 1531, all construction activities shall occur outside the current culverts and no deeper than 25 feet inside the culverts to avoid a negative effect on the colony, (3) no night work shall occur around the culvert openings and only construction lighting necessary for safety purposes shall be used near the culvert openings and 4) design lighting such that it minimizes light trespass into adjacent habitat. All lighting fixtures will have light shields or similar devices (e.g., Dark Sky-compliant lighting) installed to minimize illuminance above the site and avoid light trespass into Gypsum Creek and other adjacent open space areas. The color temperature of the light emitted by the luminaires should be less than 2700 Kelvin to minimize adverse effects to wildlife, including bats. The specifications shall be prepared by a CDFW approved bat biologist. Following completion of construction activities associated with the culverts, the project biological monitor shall provide written notification to the Planning Department that the contractor specifications have been complied with.

The specifications shall also include the conduction of a bat habitat assessment of suitable roosting trees prior to construction. If trimming or removal of suitable roosting trees are identified within the project work area, a CDFW approved bat biologist will work with the construction contractor during the trimming and removal process. Trees and snags that have been identified as confirmed or potential roost sites require a two-step removal process and the involvement of the bat biologist to ensure that no roosting bats are killed during this activity.

This two-step removal shall occur over 2 consecutive days as follows. On Day 1, branches and limbs not containing cavities, as identified by a qualified bat biologist, will be removed. On Day 2, the remainder of the tree may be removed without supervision by a bat biologist. The disturbance caused by limb or frond removal, followed by an interval of 1 evening, will allow bats to safely abandon the roost.

Proposed Project and
has been augmented
to include additional
provisions to address
potential lighting
impacts from Gypsum
Canyon Road and
preconstruction
surveys.
8 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
MM 6-6 Prior to approval of mass or rough grading plans issuance of a grading permit, the property owner/developer shall submit copies of contractor specifications to the Department of Public Works/Planning & Building Department that include the following requirements to protect nesting birds regulated by the Migratory Bird Treaty Act: “When feasible, vegetation removal activities shall be scheduled between July 16 and February 14 to avoid the nesting season. This would ensure that no active nests would be disturbed and that removal could proceed rapidly.

If vegetation removal activities shall occur during the nesting season (February 15 to July 15), all suitable habitat shall be thoroughly surveyed for the presence of nesting birds by a qualified biologist prior to removal.

If any active nests are detected, the area shall be flagged, along with a minimum 50-foot buffer (buffer may range between 50 and 300 feet as determined by the monitoring biologist) and shall be avoided until the nesting cycle is complete or it is determined by the monitoring biologist that the nest has failed.” In addition, a biologist shall be present on the site to monitor the vegetation removal to ensure that nests not detected during the initial survey are not disturbed. The project biological monitor shall provide written notification to the Planning & Building Department that these requirements have been accomplished following completion of grading activities associated with each grading permit.

Mitigation Measure is
applicable to the
Proposed Project as
slightly modified.

Department of Public
Works/Planning &
Building Department
Prior to issuance of a
grading permit.

3.7 Traffic & Circulation
MM 7-3 Prior to the approval of each development area plan, the property owner/developer shall submit a traffic phasing plan. The plan shall be reviewed and approved by the Department of Public Works, Development Services Division and Traffic Engineering Division, and the Fire Department. The plan shall also be submitted for review and comment by Caltrans if any portion of the plan involves Caltrans facilities. The plan shall include the following items:

A. Documentation of the number of units and product types of each development area and resulting VMT shall be provided for locations.

B. Phasing of roadway construction, specifying which roads shall be constructed as backbone streets and which roads shall be constructed with tract development.

Mitigation Measure is
applicable to
Development Area 5,
which contains the
project site.

Department of Public
Works/Planning &
Building Department,
Development
Services Division,
Traffic Engineering
Division,
Prior to the approval
of each development
area plan.
9 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
C. Traffic improvements (including signals, signage and striping) to local streets, arterials and intersections, freeway interchanges and bridge over-crossings.

D. Identification of measures that will be incorporated to minimize the impacts of project construction traffic on Gypsum Canyon Road between the SR-91 westbound off-ramp and Santa Ana Canyon Road; Gypsum Canyon Road/SR-91 interchange ramps; and Santa Ana Canyon Road between Gypsum Canyon Road and Weir Canyon Road.

MM 7-4 Prior to approval of a grading plan for each development area, the property owner/developer shall submit a traffic control plan including construction haul routes, duration and location of lane closures, and any pedestrian-related impacts to sidewalks and intersection crossings, for review and approval by the Department of Public Works, Development Services Division and Traffic Engineering Division.

Mitigation Measure is
applicable to
Development Area 5,
which contains the
project site.

Department of Public
Works/Planning &
Building Department,
Development
Services Division, and
Traffic Engineering
Division
Prior to approval of a
grading plan for each
development area.

3.8 Air Quality
MM 8-1 Construction: Particulate Emission (PM10) Control. Prior to approval of the first grading plan, the following requirements shall be incorporated into the Storm Water Pollution Prevention Program (SWPPP) and Erosion and Sedimentation Control Plan submitted for review and approval by the Department of Public Works. During construction of the Proposed Project, the property owner/development and its contractors shall be required to comply with regional rules, which shall assist in reducing short-term air pollutant emissions. SCAQMD Rule 402 requires that air pollutant emissions not be a nuisance off-site. SCAQMD Rule 403 requires that fugitive dust be controlled with the best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. Two options are presented in Rule 403: monitoring of particulate concentrations or active control. Monitoring involves a sampling network around the project with no additional control measures unless specified concentrations are exceeded. The active control option does not require any monitoring but requires that a list of measures be implemented starting with the first day of construction.

Mitigation Measure is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to approval of
the first grading plan.
10 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
Rule 403 requires that “No person conducting active operations without utilizing the applicable best available control measures included in Table 1 of this Rule to minimize Fugitive dust emissions from each fugitive dust source type within the active operation.” The measures from Table 1 of Rule 403 are presented in Table 15 in Appendix H of EIR No. 331. The applicable measures presented in Table 1 are required to be implemented by Rule 403.
 Rule 403 requires that “Large Projects” implement additional measures. A Large Project is defined as “any active operations on property which contains 50 or more acres of disturbed surface area; or any earth-moving operation with a daily earth-moving or throughput volume of 3,850 cubic meters (5,000 cubic yards) or more three times during the most recent 365 day period. Grading of the project would be considered a Large Project under Rule 403.

Therefore, the project shall be required to implement the applicable actions specified in Table 2 of the Rule. Table 2 from Rule 403 is presented in Table 16 of Appendix H. As a Large Operation, the project shall also be required to:
 Submit a fully executed Large Operation Notification (SCAQMD Form 403N) to the SCAQMD Executive Officer within 7 days of qualifying as a large operation;
 Include, as part of the notification, the name(s), address(es), and phone number(s) of the person(s) responsible for the submittal, and a description of the operation(s), including a map depicting the location of the site;
 Maintain daily records to document the specific dust control actions taken, maintain such records for a period of not less than three years; and make such records available to the Executive Officer upon request.
 Install and maintain project signage with project contact signage that meets the minimum standards of the Rule 403 Implementation Handbook, prior to initiating any earthmoving activities. 11 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
 Identify a dust control supervisor that is employed by or contracted with the property owner/developer, is on the site or available on-site within 30 minutes during working hours, has the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule requirements, and has completed the AQMD Fugitive Dust Control Class and has been issued a valid Certificate of Completion for the class.
 Notify the SCAQMD Executive Officer in writing within 30 days after the site no longer qualifies as a large operation.

Rule 403 also requires that the construction activities “shall not cause or allow PM10 levels exceed 50 micrograms per cubic meter when determined by simultaneous sampling, as the difference between upwind and downwind sample.” Large Projects that cannot meet this performance standard are required to implement the applicable actions specified in Table 3 of Rule 403. Table 3 from Rule 403 is presented in Table 17 of Appendix H. Rather than perform monitoring to determine conformance with the performance standard, which will not reduce PM10 emissions, the project shall implement all applicable measures presented in Rule 403 Table 3 regardless of conformance with the Rule 403 performance standard. This potentially results in a higher reduction of particulate emissions than if these measures were implemented only after being determined to be required by monitoring.

Further, Rule 403 requires that that the project shall not “allow track-out to extend 25 feet or more in cumulative length from the point of origin from an active operation.” All track-out from an active operation is required to be removed at the conclusion of each workday or evening shift. Any active operation with a disturbed surface area of five or more acres or with a daily import or export of 100 cubic yards or more of bulk materials must utilize at least one of the measures listed in Table 18 of Appendix H at each vehicle egress from the site to a paved public road.

MM 8-2 Construction: Construction Equipment Emission Control. Prior to approval of grading plans, the property owner/developer shall include the following notes on the contractor specifications submitted for review and approval by the Department of Public Works: “To reduce Mitigation Measure is
applicable to the
Proposed Project and
has been augmented
Department of Public
Works/Planning &
Building Department
Prior to approval of
grading plans.
12 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
construction equipment emissions, the following measures shall be implemented when feasible.
 Use low emission mobile construction equipment with engines that meet or exceed the CARB Tier 2 emissions standards. The property owner/developer shall comply with CARB requirements for heavy construction equipment.
 Idling times shall be minimized by either shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of the California Code of Regulations [CCR]).  Maintain construction equipment engines by keeping them maintained and tuned in accordance with manufacturer’s
specifications.
 Use low sulfur fuel for stationary construction equipment. This is required by SCAQMD Rules 431.1 and 431.2.
 Utilize existing power sources (i.e., power poles) when feasible. This measure would minimize the use of higher polluting gas or diesel generators.
 Configure construction parking to minimize traffic interference.  Minimize obstruction of through-traffic lanes. When feasible, construction should be planned so that lane closures on existing streets are kept to a minimum.
 Schedule construction operations affecting traffic for off-peak hours.  Develop a traffic plan to minimize traffic flow interference from construction activities (the plan may include advance public notice of routing, use of public transportation and satellite parking areas with a shuttle service.
 Use aqueous diesel fuel where feasible and reasonably commercially available.
 Use cooled exhaust gas recirculation (EGR) where feasible and reasonably commercially available.
to include additional
provisions based on
updates to standards.
13 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure

3.9 Noise
No mitigation measures pertaining to noise identified in MMP No. 137 would apply to the Proposed Project.

3.10 Hazards and Hazardous Materials
MM 10-1 The Robertson’s Ready Mix Quarry area will not be developed until after reclamation and remediation are complete. Based on the Environmental Site Assessments performed for the project site (included in Appendix J), it is not anticipated that any underground storage tanks, septic systems, leach fields, or significant soil contamination will be encountered during construction, as construction shall occur after remediation and reclamation are complete (all regulatory agency cases on-site are closed). As described in the Phase I ESA (December 2023), residual shallow soil and groundwater contamination associated with prior mining activities and historic ADL contamination associated with SR-91 could be encountered during construction and were identified as RECs.

Prior to the issuance of a grading permit, a Phase II ESA shall be conducted in order to confirm the presence/absence of these RECs and whether any further remedial actions would be required prior to or during grading activities.

During grading activities, in the event these subsurface features or contaminated soil are encountered, work shall immediately cease in the area and the property owner/developer shall notify the Fire Department and Public Utilities, Environmental Services Division, other agencies as appropriate based on the circumstances of the contamination, and retain a qualified hazardous materials engineer or geologist to assess the impacts and prepare a response plan using risk-based cleanup standards of the City of Anaheim and the Orange County Health Care Agency, and any appropriate guidelines issued by the California Environmental Protection Agency, applicable to residential land use the Proposed Project. Upon approval of the response plan by the Fire Department or other agency, as applicable, the engineer shall obtain any required permits, oversee the removal of such features and/or conduct the response work to the satisfaction of the Fire Department or other agency, as applicable, until closure status is attained.

Mitigation Measure is
applicable to the
Proposed Project
with modifications, as
reclamation efforts
have since been
completed, and the
addition of a
requirement to
prepare a Phase II
ESA due to the
potential presence of
RECs.

Department of Public
Works/Planning &
Building Department;
Fire Department or
other appropriate
agencies
Prior to and during
grading activities.
14 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
MM 10-2 Prior to approval of grading plans within an area in which the Southern Trails Pipeline is located or is proposed to be relocated within the grading plan boundaries, the property owner/developer shall obtain the approval of the Questar Pipeline Company. Written evidence of this approval shall be submitted to the Department of Public Works.

Mitigation Measure is
applicable to the
Proposed Project as
the Southern Trails
Pipeline is located
within the project
site.

Department of Public
Works /Planning &
Building Department
Prior to approval of
grading plans within
an area in which the
Southern Trails
Pipeline is located or
is proposed to be
relocated within the
grading plan
boundaries.

MM 10-3 Prior to approval of any grading plans within a development area wherein the Southern Trails Pipeline exists or is proposed to be relocated, the property owner/developer shall submit a safety plan to the Fire Department. If there are any environmental concerns relating to developing adjacent to the pipeline or relocating it identified during subsequent reviews, the property owner/developer shall be responsible for financing/implementing any necessary mitigation measures. The safety plan shall be consistent with safety regulations adopted by the Fire Department and shall also be consistent with the requirements of MM 10-4. The safety plan shall be reviewed by the Questar Pipeline Company and approved by the Fire Department. Relocation of the pipeline shall occur at no cost to the City.

Mitigation Measure is
applicable to the
Proposed Project as
the Southern Trails
Pipeline is located
within the project
site.

Fire Department Prior to approval of
any grading plans
within a
development area
wherein the
Southern Trails
Pipeline exists or is
proposed to be
relocated.

MM 10-4 Prior to issuance of building permits, the property owner/developer shall provide written evidence to the Public Utilities Department that the relocated Southern Trails Pipeline has been inspected and approved by the California Public Utilities Commission (CPUC).

Mitigation Measure is
applicable to the
project site as the
Southern Trails
Pipeline is located
within the project
site.

Public Utilities
Department
Prior to issuance of
building permits.

3.11 Population and Housing
No mitigation measures pertaining to population and housing were identified in MMP No. 137.

3.12 Public Services and Utilities
MM 12-1 Prior to the issuance of the first building permit, the property owner/ developer shall pay the Public Utilities Department a proportionate share of a water supply source to meet the projected increases in water demands in accordance with Rule 15.C, Section 3, of the Public Utilities Mitigation Measure is
applicable to the
Proposed Project.

Public Utilities
Department
Prior to the issuance
of the first building
permit.
15 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
Rates, Rules, and Regulations. Although the Water Supply Assessment concluded that there is adequate capacity to serve the proposed project, an additional water supply source will ensure that there is no loss of redundancy and/or reliability to the city water supply system.

MM 12-2 Prior to approval of street improvement plans, the property owner/developer shall submit Traffic Management Plans to the City of Anaheim Department of Public Works and Yorba Linda Public Works Department for proposed street improvements within the respective jurisdictions for review and approval. The Traffic Management Plans shall describe traffic control measures that shall be implemented to maintain traffic flow in all directions where utility improvements are being implemented in existing roadways. Said traffic management measures shall be implemented on-going during road construction.

Mitigation Measure
is applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to approval of
street improvement
plans and on-going
during road
construction
MM 12-3 Prior to approval of the first utility or infrastructure plan serving each development area with impacts to public streets, the property owner/developer shall submit a utility layout and trenching plan to the Department of Public Works for all existing public streets. Trench replacement shall, at a minimum, conform to Public Works Standard Detail No. 132. Joint trenches shall be used whenever practicable. The asphalt pavement restoration widths shall be approved by the Department of Public Works based on anticipated impact of construction and layout of trenches within the public right-of-way.

Mitigation Measure is
applicable to the
Proposed Project as
the proposed water
line extension would
run below Santa Ana
Canyon Road.

Department of Public
Works/Planning &
Building Department
Prior to approval of
the first utility or
infrastructure plan
serving each
development area
with impacts to
public streets.

MM 12-7 Prior to approval of street improvement plans, the property owner/developer shall submit Traffic Management Plans to the Department of Public Works describing traffic control measures that shall be implemented to maintain traffic flow in all directions where utility improvements are being implemented in existing roadways. The traffic control measures may include flagmen, appropriate signage and traffic control barriers consistent with City of Anaheim requirements, or other appropriate measures. The Traffic Management Plans shall be reviewed and approved by the Department of Public Works, Traffic Engineering Division.

Mitigation Measure is
applicable to the
Proposed Project.

Department of Public
Works, Traffic
Engineering Division
Prior to the approval
of street
improvement plans. MM 12-10 Prior to issuance of the first building permit for each tentative tract or parcel map, the property owner/developer shall pay fees and provide the necessary infrastructure for the installation of the on-site and off-site Mitigation Measure is
applicable to the
Proposed Project.

Planning & Building
Department
Fees shall be paid
prior to issuance of
the first building
16 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
electrical and communication systems to serve said tract, designed and phased to provide electrical service for the development areas within the project site. This shall include line extensions from the Park Substation to the development site. The applicable improvements shall be installed prior to the first final building and zoning inspection for the tract or parcel map.
permit for each
tentative tract or
parcel map.

Improvements
required to be
installed prior to first
final building and
zoning inspection for
each tract or parcel.

3.13 Recreation
No mitigation measures pertaining to recreation were identified in MMP No. 137.

3.14 Cultural Resources
MM 14-1 Prior to the issuance approval of a grading plan or issuance of a building permit, whichever occurs first, the property owner/developer shall retain a County-certified archaeologist (project archaeologist) and submit written confirmation of this to the Department of Public Works/Planning and Building Division. The project archaeologist shall observe grading activities during project construction and recover, catalogue, analyze, and report archaeological resources as necessary in the previously undeveloped of-way) portions of the development area.

The project archaeologist shall be present at the pre-grade conference.

The project archaeologist shall submit to the Planning Department, and Department of Public Works, Development Service Division, a written plan with procedures for archaeological resource monitoring. For work within Caltrans right-of-way the plan shall be submitted for review by Caltrans Cultural Resources staff. This plan shall include procedures for temporarily halting or redirecting work to permit the sampling, identification and evaluation of the resources as appropriate, and a requirement that a Native American monitor retained by the property owner/developer be present during any required excavation. If the archaeological resources are found to be significant, the project archaeologist shall determine appropriate actions-in cooperation with the City of Anaheim or Caltrans, if within Caltrans right-of-way-for exploration and/or data recovery to adequately recover the scientifically significant information from or about the archeological resource. The Mitigation Measure is
applicable to the
Proposed Project,
with the omittance of
activities within
Caltrans right-of-way.

Department of Public
Works/Planning &
Building Department
Prior to the issuance
of a grading permit.
17 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
project archaeologists shall prepare any excavated material to the point of identification. Following the completion of grading associated with project construction, the archaeologists shall prepare a report detailing the results of the monitoring program to be presented to the City of Anaheim Planning Department. The report shall follow guidelines of the California Office of Historic Preservation (1990). Excavated finds shall be accessioned into a qualified scientific institution that meets, or exceeds, the requirements of 36 CFR 79.

MM 14-2 If human remains are encountered during the conduct of ground- disturbing activities, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition of the materials pursuant to Public Resources Code Section 5097.98. The County Coroner must be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner would notify the Native American Heritage Commission (NAHC). The NAHC would determine and notify a Most Likely Descendent (MLD). The MLD may inspect the site of the discovery with the permission of the property owner/developer or his/her authorized representative. The descendent must complete the inspection within 24 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials.

Mitigation Measure is
applicable to the
Proposed Project.

Planning & Building
Department
During the conduct
of ground-disturbing
activities.

MM 14-3 Prior to issuance of the first grading permit, the property owner/developer shall submit a monitoring plan, prepared by an Orange County certified paleontologist to the Department of Public Works, Development Services Division/Planning & Building Department that ensures that the following actions are implemented:

A. The area west of Gypsum Canyon is comprised almost entirely of the Topanga Formation (high paleontological sensitivity) and contains all of the heretofore recognized surface occurrences of fossils on the project site. The north-central portion of the project site is comprised chiefly of the interbedded undifferentiated Vaqueros and Sespe Formations (moderate to high paleontological sensitivity) and smaller elements of the Sespe, Santiago, and Topanga Formations (all high paleontological sensitivity). Paleontological monitoring in the western Mitigation Measure is
applicable to the
Proposed Project.

Department of Public
Works, Development
Services Division
Prior to issuance of
the first grading
permit.
18 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
and north-central areas of the project site shall be conducted on a full-time basis and shall be identified as such in the monitoring plan. It shall be the responsibility of the project paleontologist to show, to the satisfaction of the City, the recommended limits of full-time monitoring on the tentative tract or parcel map level grading plans, when available. Because of the potential for identifying microfossils or small fragments of macrofossils, periodic screening of sediments from cuts in these formations shall be carried out by the project paleontologist. Such material may be removed in bulk and screened off-site to minimize interference with grading operations.

B. The Holz Shale, Schulz Ranch Member of the Williams Formation, the Silverado Formation, Santiago Formation, and the Sespe Formation, exposed primary east of Gypsum Canyon, shall be monitored as determined necessary by the project paleontologist during grading operations. Recommended hours for monitoring activities shall be established by the project paleontologist and shall be outlined in the monitoring plan. It shall be the responsibility of the project paleontologist to demonstrate, to the satisfaction of the City, the appropriate level of monitoring necessary based on the tentative tract or parcel map level grading plans, when available. Because of the potential for identifying microfossils or small fragments of macrofossils, periodic screening of sands from cuts in these units shall be done by the project paleontologist monitor. Such material may be removed in bulk and screened off-site to minimized interference with grading operations.

C. Any paleontological work at the site shall be conducted under the direction of a County of Orange Certified paleontologist (project paleontologist).

D. If a fossil discovery occurs during grading operations when the project paleontologist is not present, grading shall be diverted around the area until the monitor can survey the area, and or Caltrans Cultural resources staff can inspect the site, if the resources are to be found within Caltrans right-of-way.
19 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.A: Applicability of Mitigation Measures Identified in MMP No. 137 EIR No. 331 Mitigation Measures Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for
Mitigation Measure
E. Any fossils recovered during the development, along with their contextual stratigraphic data, shall be donated to the County of Orange, or other appropriate institution with an educational and research interest in the materials. A final report detailing findings and disposition of specimens shall be prepared by the project paleontologist and submitted to the City of Anaheim Planning & Building Department upon completion of grading.
20 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition

3.1 Land Use and Planning
No Standard Conditions pertaining to land use and planning were identified in MMP No. 137.

3.2 Landform and Aesthetics
SC 2-1 Prior to approval of grading plans, the property owner/developer shall provide grading plans to the Department of Public Works demonstrating that graded areas will be compatible with natural landform characteristics in conformance with the Anaheim Municipal Code, Title 17 Land Development and Resources, the City of Anaheim Grading Design Manual and Hillside Grading Procedures, the Mountain Park Specific Plan Grading Concept and Hillside Grading and Landscape Policies, and the most recent version of the California Building Code (CBC)Anaheim Building Code (ABC).

Standard Condition is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to approval of
grading plans.

SC 2-2 Prior to approval of precise grading plans, the property owner/developer shall prepare a detailed slope landscape plan, which shall be approved by the Department of Public Works. The plan shall be certified by a licensed landscape architect and be prepared in compliance with Section 17.06 of the City of Anaheim Municipal Code and the Mountain Park Specific Plan Grading Concept and Hillside Grading and Landscape Policies to blend landscape features with the existing environment. In addition, the landscape plan shall conform to the preliminary landscape plan approved in conjunction with the development area plans.

Standard Condition is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to approval of
precise grading
plans.

SC 2-3 Tree replacement shall be conducted consistent with Section

18.112.07018.040. Prior to approval of grading plans, the property owner/developer shall provide a Specimen Tree Removal Plan to the Planning Department demonstrating that the proposed project has been designed in accordance with the provisions of Chapter 18.112.07018.040 and required tree replacement. The Specimen Tree Removal Plan will include an inventory of directly and indirectly affected trees that shall be determined either by referencing existing tree inventory data collected on the subject property or having a qualified arborist conduct an assessment based on the final, approved limits of development. The tree inventory will determine the species, number, sizes, and health of all trees to be impacted by the approved project and will be used to determine compensation ratios based on City of Anaheim (City) requirements. Protected trees shall not be removed or trimmed without Standard Condition is
applicable to the
Proposed Project and
has been augmented
to include current
City Municipal Code.

Planning & Building
Department
Prior to approval of
grading plans.
21 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
proper City permits. All Specimen Trees shall be replaced by four trees from the City’s Replacement Tree List (Table 18-B) in Section 18.18.040.

In addition, per Municipal Code 18.112.070 each specimen tree removed will be replaced by additional trees chosen from Table 1 Mountain Park Tree List, up to an overall replacement ratio of 20 to 1. Compensatory planting should be conducted within the portion of the project area that would remain undeveloped under the approved plans, or at an off-site location as approved by the City.

SC 2-4 Prior to approval of street improvement plans for a development area; the property owner/developer shall submit a detailed lighting plan for review and approval by the Public Utilities Department. The plan shall be reviewed for compliance with adopted City standards.

Standard Condition is
applicable to the
Proposed Project.

Public Utilities
Department
Prior to approval of
street improvement
plans for a
development area.

3.3 Geology and Soils
SC 3-1 Prior to issuance of each building permit, the property owner/developer shall demonstrate that each structure has been designed in accordance with the most recent seismic standards in the CBC (California Building Code) ABC (Anaheim Building Code) and approved by the Chief Building Official. The CABC contains provisions that regulate the design and construction of excavations, foundations, retaining walls and other building elements to control the effects of seismic ground shaking and adverse soil conditions.

Standard Condition is
applicable to the
Proposed Project.

Chief Building Official Prior to issuance of
each building
permit.

SC 3-2 Prior to issuance of building permits, the property owner/developer shall submit building pad certifications to the Department of Public Works, as required in Code Section 17.06, documenting that grading has been completed in conformance with the Anaheim Municipal Code, Title 17- Land Development and Resources, the City of Anaheim Grading Design Manual and Grading Plan Procedures, and the Mountain Park Specific Plan Grading Concept and Hillside Grading and Landscape Policies.

Standard Condition is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to issuance of
building permits.

SC 3-3 In compliance with the Anaheim Municipal Code, prior to approval of each mass grading plan, the property owner/developer shall submit a preliminary Works, and geotechnical report prepared by an engineering geologist and geotechnical engineer to the Department of Public Works for review and approval. This report shall be prepared to the satisfaction of the City Engineer and shall address soil and geology related constraints and hazards identified in EIR No. 331 such as slope stability, settlement, Standard Condition is
applicable to the
Proposed Project,
with the omittance of
activities within
Caltrans right-of-way.

Department of Public
Works/Planning &
Building Department
Prior to approval of
each mass grading
plan.
22 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
liquefaction, and related secondary seismic hazards. For grading within Caltrans right-of-way, a preliminary geotechnical report in compliance with Caltrans regulations shall be submitted and approved by Caltrans.

Specifically, the report shall:
 Include an assessment of potential soil related constraints such as stability of proposed cut, fill and natural slopes. Conduct further subsurface exploration to refine geologic structure for cut slope stability. If the report finds stabilization necessary, grading plans shall require corrective measures to address the need for stabilization;  Include an assessment of on-site landslides and appropriate corrective measures, such as further subsurface exploration of landslide areas beneath planned fills and development areas. Corrective measures would include complete removal, if feasible or stabilization or buttressing of the landslide. This would involve partial removal of the landslide and stabilizing potential future movement with earthen fill or reinforced materials;
 Include subsurface exploration of alluvial and canyon drainage areas beneath planned fills or development areas;
 E valuate excavation characteristics of on -site earth materials;  Include subsurface exploration to refine geologic structure for cut slope stability;
 Establish specific remedial grading requirements, including but not limited to establishing parameters for stabilization/buttressing of slopes, removal of unstable soil materials; Provide grading, foundation, and structural design recommendations based on findings of future geotechnical investigations;
 Address settlement, liquefaction, and structural design recommendations. Grading plans shall incorporate removal, where feasible, of all potentially liquefiable alluvium. The grading plans shall also incorporate placement of engineered fill in the canyons and installation of a subdrain system;
 Address the potential for expansive soils. Representative soil samples of near-surface soil material shall be collected and tested for 23 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
expansion potential after the completion of rough grading on-site.

Expansive soils that are detrimental to the project shall be subject to special building/foundation design, deepened foundations, post- tension foundations, soil removal, selective grading to blend highly expansive soils with soils of low expansivity, moisture conditioning, or other corrective measures as recommended by a licensed
soils/geotechnical engineer and approved by the City Engineer prior to approval of each grading plan;
 Include an evaluation of potentially corrosive soils and recommend appropriate corrective measures. If corrosive soils are found, corrective measures shall be incorporated into the grading plans;  Address collapsible/compressible material. This material shall be subject to removal or other corrective measures in all areas planned for structural fill. Topsoil, colluvium, alluvium, highly weathered bedrock, and landslide materials with settlement potential shall be subject to corrective measures such as removal and recompaction, surcharging, settlement monitoring, and/or other measures deemed appropriate by the geotechnical engineer of record and approved by the City Engineer prior to approval of each grading plan;  Include appropriate laboratory testing to define soil engineering parameters;
 Include additional refraction lines to better ascertain rock hardness and rippability for specific planned cut areas;
 Include a review of seismic and faulting conditions on-site. Seismic design parameters identified for the project shall be incorporated into project design as applicable. Caltrans seismic design criteria for the proposed overcrossings shall be incorporated into overcrossing design and implementation; and,
 Corrective work within Caltrans right-of-way shall be done in accordance with Caltrans standard specifications.

3.4 Hydrology
No Standard Conditions pertaining to hydrology were identified in MMP No. 137. 24 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition

3.5 Water Quality
SC 5-1 Prior to approval of each mass or rough grading plan, the property owner/developer shall submit a project water quality management plan (WQMP) to the Department of Public Works for review and approval. The WQMP shall demonstrate compliance with the implementation plans under the Orange County MS4 Permit, namely the Drainage Area Management Plan/Local Implementation Plan (DAMP/LIP).

Standard Condition is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to the approval
of each mass or
rough grading plan.

SC 5-2 Prior to the approval of grading plans, the property owner/developer shall provide written evidence to the Department of Public Works that it has filed a Notice of Intent with the Regional Water Quality Control Board in order to obtain coverage under the National Pollutant Discharge Elimination System (NPDES) Permit and Waste Discharge Requirements for Discharges of Stormwater Runoff Associated with Construction and Land Disturbance Activities Order No. 2022-0057-DWQ, NPDES No.

CAS000002 (Construction Stormwater General Permit) (CGP) (NPDES No.

CAS000002, Resolution No. 2001-046, or the latest approved CGP.

Pursuant to the permit requirements, the property owner/developer shall develop a Stormwater Pollution Prevention Plan (SWPPP) that incorporates Best Management Practices for reducing or eliminating construction related pollutants in the site runoff.

Standard Condition is
applicable to the
Proposed Project,
with the
understanding that
the documents from
under which to gain
coverage have since
undergone updates.

Department of Public
Works/Planning &
Building Department
Prior to the approval
of grading plans.

SC 5-3 Prior to approval of a grading plan, the Department of Public Works shall verify that the project complies with the Waste Discharge Requirements (WDR) Permit for Discharges to Surface Waters That Pose an Insignificant (De Minimis) Threat to Water Quality (Groundwater Discharge Permit) (Order No. R8-2020-0006, NPDES No. CAG998001) General Waste Discharge Requirements issued by the Santa Ana Regional Water Quality Control Board (RWQCB) Order No. R8-2003-0061, and NPDES No.

CAG998001 (or latest approved equivalent) are in effect and shall govern discharges from construction dewatering and water line/sprinkler line testing should they occur during construction. The property owner/developer shall comply with these regulations including provisions requiring notification, testing and reporting of dewatering and testing- related discharges, which shall mitigate any impacts of such discharges.

Standard Condition is
applicable to the
Proposed Project,
with the
understanding that
the documents to
ensure compliance
with have since
undergone updates.

Department of Public
Works/Planning &
Building Department
Prior to approval of a
grading plan.
25 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition

3.6 Biological Resources
SC 6-1 Prior to approval of mass or rough grading plans impacting jurisdictional areas, the property owner/developer shall provide written evidence to the Department of Public Works/Planning & Building Department of compliance with the provisions of Section 1602 of the California Fish and Game Code. This shall be accomplished by providing a copy of the executed Streambed Alteration Agreement. Mass or rough grading plans shall include identification of Environmentally Sensitive Areas (ESA) and shall show placement of orange fencing or similar material to delineate and avoid jurisdictional features adjacent to the construction area.

Standard Condition is
applicable to portions
of the project site
with the potential to
impact jurisdictional
areas.

Department of Public
Works/Planning &
Building Department
Prior to approval of
mass or rough
grading plans
impacting
jurisdictional areas.

SC 6-2 Prior to approval of mass or rough grading plans impacting jurisdictional areas, the property owner/developer shall provide the Department of Public Works/Planning & Building Department with a copy of the executed Section 404 permit obtained from the Army Corp of Engineers (ACOE). Mass or rough grading plans shall include identification of Environmentally Sensitive Areas (ESA) and shall show placement of orange fencing or similar material to delineate and avoid jurisdictional features adjacent to the construction area.

Standard Condition is
applicable to portions
of the project site
with the potential to
impact jurisdictional
areas and has been
augmented to
include identification
of ESA areas.

Department of Public
Works/Planning &
Building Department
Prior to approval of
mass or rough
grading plans
impacting
jurisdictional areas.

SC 6-3 Prior to approval of mass or rough grading plans, the property owner/developer shall provide the Department of Public Works/Planning & Building Department with a copy of the Section 401 water quality certification obtained from the Regional Water Quality Control Board (RWQCB). Mass or rough grading plans shall include identification of Environmentally Sensitive Areas (ESA) and shall show placement of orange fencing or similar material to delineate and avoid jurisdictional features adjacent to the construction area.

Standard Condition is
applicable to the
Proposed Project and
has been augmented
to include
identification of ESA
areas.

Department of Public
Works/Planning &
Building Department
Prior to approval of
mass or rough
grading plans.

SC 6-4 Prior to approval of mass or rough any grading plans, the project biologist shall review the following contract specifications to verify that the following measures to minimize impacts to the coastal California gnatcatcher, western spadefoot and other coastal sage scrub (CSS) species or species covered by the Central/Coastal NCCP/HCP have been included on the specifications. The project biologist shall provide written evidence to the Department of Public Works in the form of a note on the grading plans that this condition has been completed.

Standard Condition is
applicable to the
Proposed Project as
the named species
have been
documented within
the project site.

Department of Public
Works/Planning &
Building Department
Prior to approval of
any grading plans.
26 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
 To the maximum extent practicable, no grading of coastal sage scrub (CSS) habitat that is occupied by nesting gnatcatchers will occur during the breeding season (February 15 through July September 15). It is expressly understood that this provision and the remaining provisions of these "construction-related minimization measures" are subject to public health and safety considerations. These considerations include unexpected slope stabilization, erosion control measures and emergency facility repairs. In the event of such public health and safety circumstances, landowners or public agencies/utilities will provide United State Fish and Game Wildlife Service/California Department of Fish and Wildlife (USFWS/CDFWG) with the maximum practicable notice (or such notice as is specified in the Natural Communities Conservation Program/Habitat Conservation Plan (NCCP/HCP) to allow for capture of gnatcatchers, cactus wrens, and any other CSS Identified Species that are not otherwise flushed, and will carry out the following measures only to the extent as practicable in the context of the public health and safety considerations.  Prior to commencement of grading operations or other activities involving significant soil disturbance, all areas of CSS habitat to be avoided under the provisions of the NCCP/HCP, shall be identified with temporary fencing or other markers clearly visible to construction personnel. Additionally, prior to the commencement of grading operations or other activities involving disturbance of CSS, a survey will be conducted to locate gnatcatchers and cactus wrens within 100 feet of the outer extent of projected soil disturbance activities and the locations of any such species shall be clearly marked and identified on the construction/grading plans.

A monitoring biologist, acceptable to USFWS/ CDFW G will be on site during any clearing of CSS. The landowner or relevant public agency/utility will advise USFWS/ CDFWG at least seven (7) calendar days [and preferably fourteen (14) calendar days] prior to the clearing of any habitat occupied by Identified Species to allow USFWS/ CDFWG to work with the monitoring biologist in connection with bird flushing/capture activities. The monitoring biologist will flush Identified Species (avian or 27 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
other mobile Identified Species) from occupied habitat areas immediately prior to brush-clearing and earth-moving activities. If birds cannot be flushed, they will be captured in mist nets, if feasible, and relocated to areas of the site to be protected or to the NCCP/HCP Reserve System. It will be the responsibility of the monitoring biologist to assure that Identified bird or other mobile species will not be directly impacted by brush clearing and earth-moving equipment in a manner that also allows for construction activities on a timely basis.
 Following the completion of initial grading/earth movement activities, all areas of CSS habitat to be avoided by construction equipment and personnel will be marked with temporary fencing and other appropriate markers clearly visible to construction personnel. No construction access, parking, or storage of equipment or materials will be permitted within such marked areas.
 In areas bordering the NCCP Reserve System or Special Linkage/Special Management areas containing significant CSS identified in the NCCP/HCP for protection, vehicle transportation routes between cut- and-fill locations will be restricted to a minimum number during construction consistent with project construction requirements.

Waste dirt or rubble will not be deposited on adjacent CSS identified in the NCCP/HCP for protection. Pre-construction meetings involving the monitoring biologist, construction supervisors, and equipment operators will be conducted and documented to ensure maximum practicable adherence to these measures.
 CSS identified in the NCCP/HCP for protection and located within the likely dust drift radius of construction areas shall be periodically sprayed with water to reduce accumulated dust on the leaves as recommended by the monitoring biologist.
 If western spadefoot is not found in suitable habitat areas during initial ground disturbance, the monitoring biologist will spot-check grading activities (on an as-needed basis, as determined by the monitoring biologist) until grading is completed for those areas. If western spadefoot is brought to the surface during
grading/excavation, individuals will be collected and relocated 28 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
following pre- approved methods by the California Department of Fish and Wildlife (CDFW) or an approved Western Spadefoot Management Plan
 Conduct focused surveys, by a quailed biologist, in suitable habitat for Crotch bumblebee within the project area and submit a survey report to the Public Works Department/Department of Planning & Building, prior to issuance of a grading permit. The surveys shall be conducted during the months of April through June, consisting of three site visits typically 2 to 4 weeks apart. The survey report shall document the presence or absence of Crotch bumble within the project area. If the survey results are negative, the qualified biologist will submit a summary of findings, and a survey report prepared and submitted to CDFW. If survey results are positive, the applicant will consult with CDFW to determine appropriate measures needed to address potential impacts to the species, prior to the issuance of a grading permit.

SC 6-5 Prior to approval of mass or rough grading plans, the property owner/developer shall report the amount of coastal sage scrub that would be impacted by proposed grading activities. The amount of coastal sage scrub impacts shall be noted on plans submitted for grading permits and submitted to the Planning Department and to the Nature Reserve of Orange County (NROC) to ensure that a proper accounting of coastal sage scrub impacts is recorded for purposes of the NCCP/HCP.

Standard Condition is
applicable to the
Proposed Project as
coastal sage scrub
was observed on the
project site.

Planning & Building
Department
Prior to approval of
mass or rough
grading plans.

SC 6-6 On an annual basis until grading activities are complete, the property owner/developer shall provide the Planning & Building Department and Nature Reserve of Orange County (NROC) with a calculation of the total amount of coastal sage scrub that has been removed during the calendar year.

Standard Condition is
applicable to the
Proposed Project as
coastal sage scrub
was observed on the
project site.

Planning & Building
Department
Prior to approval of
mass or rough
grading plans.

3.7 Traffic & Circulation
SC 7-1 Prior to the issuance of each building permit, the Foothill/Eastern Transportation Corridor Major Thoroughfare and Bridge Fees shall be paid by the property owner/developer to the City of Anaheim. Payment of these fees provides for the project's fair share contribution to the ultimate improvements to SR-241 and SR-261.

Standard Condition is
applicable to the
Proposed Project.

Planning & Building
Department
Prior to the issuance
of each building
permit.
29 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition

3.8 Air Quality
No Standard Conditions pertaining to air quality were identified in MMP No. 137.

3.9 Noise
SC 9-1 Prior to approval issuance of grading plans and/or prior to issuance of or building permits, plans shall include a note indicating that noise- generating project construction activities in the City of Anaheim shall not occur between the hours of 7:00 p.m. and 7:00 a.m. This requirement applies to construction activities within 3,000 feet of residential uses, consistent with the City of Anaheim Noise Ordinance.

Standard Condition is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to issuance of
grading plans or
prior to issuance of
building permits,
whichever comes
first.

3.10 Hazards and Hazardous Materials
No Standard Conditions pertaining to hazards and hazardous materials were identified in MMP No. 137.

3.11 Population and Housing
No Standard Conditions pertaining to population and housing were identified in MMP No. 137.

3.12 Public Services and Utilities
SC 12-5 Prior to final building and zoning inspections, the property owner/developer Public Utilities shall demonstrate to the Public Utilities Department that water consumption Department reduction measures have been implemented as required by State law in accordance with the Water Utilities Rates, Rules and Regulations. Where appropriate, plans submitted for building permits shall include notes on plans that indicate the measures that will be utilized to reduce water consumption. Such measures where feasible and appropriate shall include, but are not limited to:

A. Low-flush toilets and urinals (Health and Safety Code Section 17921.3); B. Maximum flow rate of all new showerheads, lavatory faucets, and sink faucets (Title 20, California Code of Regulations Section 1604[f]); C. Appliances certified by manufacturer to comply with regulations established by applicable efficiency standards (Title 20, California Code of Regulations Section 1606[b]);
D. Public lavatories equipped with self-closing faucets that limit the flow of hot water (Government Code Section 7800);
Standard Condition is
applicable to the
Proposed Project.

Public Utilities
Department
Prior to final building
and zoning
inspections,
whichever comes
first.
30 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
E. Hot water pipes insulated to reduce water used before hot water reaches equipment or fixtures (Title 24, California Code of Regulations Section 2-5352[i] and 0]);
F. Conservation reminders posted in rooms and restrooms; G. Thermostatically controlled mixing valve for bath/shower; and H. Implementation of efficient irrigation systems to minimize runoff and evaporation.

SC 12-8 Prior to approval of final tract or parcel maps, the property owner/developer shall install, bond for, or otherwise secure on-site electrical facilities in accordance with the City of Anaheim Public Utility Electric Rates, Rules and Regulations, and provide written evidence of this fact to the Public Utilities Department.

Standard Condition is
applicable to the
Proposed Project.

Public Utilities
Department
Prior to approval of
final tract or parcel
maps.

SC 12-9 The Proposed Project shall comply with all State Energy Insulation Standards Requirements (as part of the CBC), as adopted by and the City of Anaheim City Council in effect at the time of application for building permits. (Commonly referred to as Title 24, these standards are updated periodically to allow consideration and possible incorporation of new energy efficiency technologies and methods. Among other things, Title 24 covers the use of energy efficient building standards, including ventilation, insulation and construction and the use of energy saving appliances, conditioning systems, water heating, and lighting.) Plans submitted for building permits shall include written notes demonstrating compliance with energy standards and shall be reviewed and approved by the Building Division as part of the plan review process prior to issuance of building permits.

Standard Condition is
applicable to the
Proposed Project.

Building Division Prior to approval of
building permits.

SC 12-11 Prior to issuance of each building permit, the property owner/developer shall incorporate the following energy saving practices into building plans. The property owner/developer shall implement, to the extent feasible, these energy saving practices, in compliance with Title 10 of the Anaheim Municipal Code, prior to each final building and zoning inspection:

A. Consultation with the Public Utilities Department energy conservation experts for assistance with energy conservation design features.

Standard Condition is
applicable to the
Proposed Project.

Public Utilities
Department
Prior to issuance of
each building
permit.
31 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.B: Applicability of Standard Conditions Identified in MMP No. 137 EIR No. 331 Standard Conditions Modifications Under
Proposed Project
Responsible Party/
Approving Agency
Timing for Standard
Condition
B. Use of electric motors designed to conserve energy.

C. Use of special lighting fixtures such as motion sensing light switch devices and compact fluorescent fixtures in place of incandescent lights.

D. Use of T8 lamps and electronic ballasts. Metal halide or high-pressure sodium for outdoor lighting.

SC 12-13 Prior to approval of any site plans, tentative tract or parcel maps, the property owner/developer shall submit a Solid Waste Management Plan with recycling capabilities to the Department of Public Works, Streets and Sanitation Division for review and approval. Refuse collection and disposal for the proposed project shall comply with AB 939, SB 1383, the County of Orange Integrated Waste Management Plan, and the City of Anaheim Integrated Waste Management Plan.

Standard Condition is
applicable to the
Proposed Project.

Department of Public
Works, Streets and
Sanitation Division
Prior to approval of
any site plans,
tentative tract or
parcel maps.

3.13 Recreation
No Standard Conditions pertaining to recreation identified in MMP No. 137 would apply to the Proposed Project.

3.14 Cultural Resources
No Standard Conditions pertaining to cultural resources were identified in MMP No. 137. 32 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature

3.1 Land Use and Planning
No project design features pertaining to land use and planning were identified in MMP No. 137.

3.2 Landform and Aesthetics
PDF 2-1 The Mountain Park Specific Plan provides for replacement of oak, sycamore, willow and other native trees removed as a result of the project at a ratio of 20:1. In conjunction with the submittal of each tentative tract or parcel map, the property owner/developer shall submit a Detailed Landscape Plan to the Planning Department demonstrating that trees removed from the site will be replaced at a total ratio of 20:1.

The 20:1 ratio is achieved using a combination of the Scenic Corridor Overlay tree list (Anaheim Zoning Code Chapter 18.18, Table 18-B), and the Mountain Park Specific Plan Tree List.

Project Design
Feature (PDF) is
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
In conjunction with
the submittal of each
tentative tract or
parcel map.

3.3 Geology and Soils
No project design features pertaining to geology and soils were identified in MMP No. 137.

3.4 Hydrology
PDF 4-1 The Mountain Park Specific Plan includes a Proposed Drainage System Plan (refer to Exhibit 3-9 of the Draft EIR included in Attachment A). Prior to approval of the first mass grading plan, the property owner/developer shall submit a Drainage and Runoff Management Plan (RMP) to the Department of Public Works for review and approval. The RMP shall demonstrate substantial conformance with the Proposed Drainage System included in the Mountain Park Specific Plan. The Drainage and Runoff Management Plan shall include the approximate timing for construction of the following drainage facilities:

A. Gypsum Canyon Road/SR-91 Box Culvert Modification: A 1,500 linear foot culvert modification will be constructed at the downstream end of Gypsum Canyon to address existing deficiencies and accommodate proposed peak flows from the project site. The proposed storm drain improvement plan will extend the Gypsum Canyon Road/SR-91 box culvert inlet structure approximately 1,500 feet upstream following the existing alignment of the Gypsum Creek. At this location, the proposed Gypsum Canyon Road will be designed to serve as an impoundment to retain storm water runoff up to approximately 17 feet, which produces sufficient hydraulic While the Proposed
Project would also be
required to prepare
and submit an RMP
to the Department of
Public Works, the
specific drainage
facilities included in
the Proposed
Project’s RMP would
differ from the
Approved Project’s
RMP, as detailed in
this PDF, as the
development of the
Proposed Project
would result in
different post-
constriction
hydrologic conditions
Department of Public
Works/Planning &
Building Department
Prior to approval of
the first mass grading
plan.
33 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
head to convey 5,500 cfs through the culvert into Featherly Park.

The elevation difference between the flow line of the culvert inlet and the top of the road is expected to be approximately 20 feet, allowing for a freeboard of three feet. The extension of the culvert upstream, with the described design modifications to the inlet control, will prevent flooding onto Gypsum Canyon Road during large storm events. The proposed modification of the culvert will improve the flood control design capacity of the culvert from a 10- year storm event to a 100-year storm event. A confirmation of the structural integrity and design calculations of the existing culvert structure shall be completed prior to final design of the new box culvert extension.

B. West Drainage Area Storm Drain Improvement: Minor storm drain improvements to an existing undersized 36-inch reinforced concrete pipe (RCP) that collects off-site runoff from the undisturbed slopes draining into The Summit will be upsized to the capacity of a 54-inch RCP for proper conveyance of the project flows into the existing 66- inch RCP.

C. SR-91/Gypsum Canyon Road Storm Drain Improvement: A minor storm drain improvement will be implemented for the 4-acre sub- area that used to drain into the existing culvert inlet but will not adequately drain after the culvert extension. The improvement will consist of a riser tower and a RCP (size to be determined) to collect the flows and connect directly into the triple box culvert at the approximate location of the existing culvert inlet.

D. Featherly Regional Park Channel Improvements: The
improvements to the box culvert outlet for energy dissipation of flood flows will include a concrete apron followed by riprap to reduce velocities down to the 10 to 12 feet per second (fps) range.

Riprap will also be added to the embankments beyond the concrete apron. To provide additional stabilization of the channel downstream, flow velocities will be decreased to the range of 10 to 12 fps where turf-reinforced mesh blankets will be used, and vegetation re-established along the channel bottom and
and drainage
patterns due to a
proposed change in
land use and
impervious surface
area. However, the
specific drainage
facilities detailed in
the Proposed
Project’s RMP would
accomplish the same
purpose of managing
and treating
stormwater flows on
the project site prior
to discharge into the
Santa Ana River as
the Approved
Project’s RMP.
34 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
embankments. Turf-reinforced blankets (or equivalent alternatives) will continue along the embankment up to a maximum of 340 feet beyond the riprap leading up to the existing road crossing. Prior to approval of a grading permit, the property owner/developer shall provide evidence to the Department of Public Works that the design and construction of these improvements have been approved by the County of Orange Harbors, Beaches and Parks Department.

E. Outlet Points to Natural Channels: Energy dissipation/velocity reduction devices will be employed to ensure flows are released at nonerosive velocities. Such devices may include riprap, geotextiles, granule filters, fills, grade control structures and/or check dams, or equivalent measures.

F. Vegetated floodwall for Community Center: As part of final design, a vegetated floodwall would be incorporated into the portion of the slope downstream of the community center as necessary to satisfy flood control requirements.

3.5 Water Quality
PDF 5-1 In furtherance of the Orange County Drainage Area Management Plan/City of Anaheim Local Implementation Plan (DAMP/LIP) requirements, the Mountain Park Specific Plan includes the following project design features that shall be incorporated into the final project Water Quality Management Plan (WQMP). These design features meet or exceed the requirements of the DAMP/LIP. Prior to approval of each mass or rough grading plan, the property owner/developer shall submit the Final WQMP to the Department of Public Works incorporating the following measures:
 Site Design BMPs: The following site design BMPs are practices designed to minimize runoff and the introduction of pollutants in storm water runoff.
o Minimize Impervious Area and Impervious Areas Directly Connected to Storm Drains
 Minimize impervious areas by incorporating landscaped areas over substantial portions of the project area consistent with the Development Plan and Concept Landscape Plans. Single family This PDF requires
compliance with the
Orange County DAMP
and City of Anaheim
LIP through the
incorporation of
water quality BMPs,
including site design,
source control, and
treatment control
BMPs, in the Final
WQMP. Although the
Proposed Project
would prepare a Final
WQMP that would
incorporate site
design, source
control, and
Department of Public
Works/Planning &
Building Department
Prior to approval of
each mass or rough
grading plan.
35 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
residential landscape areas shall be determined by zoning development standards, including setbacks, lot coverage, street parkway standards, and design objectives;
 Minimize directly connected impervious area by draining parking lots to landscaped areas or bioretention facilities to promote filtration and infiltration of storm water, if landscaping slopes are less than 2 percent and the project is not adjacent to steep slopes;
 Utilize vegetated areas, e.g., setbacks, swales, end islands, and median strips, for biofiltration and bioretention of nuisance and storm runoff flows from parking lots and other impervious areas; and
 Design sidewalks to drain into landscaping and swales prior to discharging to the storm water conveyance system.
o Selection of Construction Materials and Design Practices  Select building material for roof gutters and downspouts that do not include copper or zinc; and
 Construct streets, sidewalks, and parking lot aisles to the minimum widths specified in the Anaheim Municipal Code or adopted Specific Plan and in compliance with the Development Plan and regulations for the Americans with Disabilities Act and safety requirements for fire and emergency vehicle access.

Incorporate landscaped buffer areas between sidewalks and streets in compliance with the Development Plan and Anaheim Municipal Code.
o Conserve Natural Areas
 Preserve existing riparian areas along Gypsum Creek and protect with buffer zones per the Development Plan;
 Preserve 2,163 acres of open space within the project boundary outside of the development area, including NCCP open space areas, open space devoted to conservation easements, and other open space;
treatment control
BMPs in compliance
with the DAMP/LIP,
the specific BMPs
may differ from those
detailed in this PDF.

Some BMPs specified
in this PDF may
remain applicable to
the Proposed Project
and be incorporated
into the Final WQMP,
some measures that
are specific to the
residential
development
proposed under the
Approved Project
would not be
applicable to the
Proposed Project.

However, the specific
BMPs detailed in the
Proposed Project’s
Final WQMP would
accomplish the same
purpose of managing
and treating
stormwater flows on
the project site prior
to discharge into the
Santa Ana River, as
the BMPs detailed in
this PDF.
36 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
 Concentrate or cluster development on the least
environmentally sensitive portions of the project site (e.g., the quarry site) while leaving the remaining land in a natural, undisturbed condition;
o Non-Structural Source Control BMPs
 N1 Education for property owners, tenants and occupants – practical information materials shall be provided to the first residents/occupants/tenants on general housekeeping practices that contribute to the protection of storm water quality. The Homeowner's Association (HOA) shall have an ongoing
educational material distribution program. At a minimum, these materials shall cover the following topics:
• The use of chemicals (including household type) that should be limited to the property, and avoidance of discharge of specified wastes via hosing or other means to gutters, catch basins, and storm drains.
• The proper importance of appropriate irrigation techniques and proper handling/application of material such as
fertilizers, herbicides, pesticides, cleaning solutions, paint products, automotive products, and swimming pool
chemicals, and swimming pool drainage.
 Use natural drainage systems to the maximum extent
practicable or create drainages (e.g., vegetated swales) that mimic natural conveyances and allow for storm water
infiltration as well as pollutant removal; and
 Maximize canopy interception and water conservation by preserving existing native trees and shrubs in natural open space areas outside of the development area, incorporating new trees into project design pursuant to landscape and reforestation plan, and including native or drought resistant plants in development plant palettes.
37 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
o Protect Slopes and Channels
 Protect slopes: minimize erosion potential with vegetative cover, route flows safely away from steep and/or sensitive slopes, stabilize disturbed slopes; and
 Protect channels: control and treat flows in landscaping and/or other controls prior to reaching existing natural drainage systems, stabilize channel crossings, ensure that increases in runoff velocity and frequency caused by the project do not erode the channel, install energy dissipaters, such as riprap, at the outlets of storm drains or conveyances.
 Source Control BMPs: The following source control BMPs shall be implemented in order to minimize the amount of pollutants in dry weather (nuisance) flows and in storm water runoff from the project. o The environmental and legal impacts of illegal dumping of harmful substances into storm drains and sewers.
o Alternative household products that are safer to the environment. o Household hazardous waste collection programs.
o Used oil-recycling programs.
o Proper procedures for spill prevention and clean up.
o Proper storage of materials that pose pollution risks to local waters.
o Carpooling programs and public transportation alternatives to driving.

N2 Activity Restrictions (Conditions, Covenants, and Restrictions).

Conditions, Covenants, and Restrictions (CC&Rs) shall be prepared as necessary and shall address surface water quality protection, or, alternatively, use restrictions shall be developed through lease terms.

N3 Common Area Landscape Management. Ongoing maintenance shall be consistent with City of Anaheim Landscape Water Efficiency (Chapter 10.19 of the Anaheim Municipal Code), plus fertilizer and/or pesticide usage shall be consistent with County Management 38 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
Guidelines for Use of Fertilizers {DAMP Section 5.5). See also, efficient irrigation systems under structural controls.

N4 BMP Maintenance. Homeowners Associations·(HOAs) shall be responsible for the inspection and maintenance of structural BMPs {including treatment controls) located within the HOA boundaries.

These BMPs are outlined below.

N11 Common Area Litter Control. HOA shall conduct litter patrol; provide for covered trash receptacles, trashcans with lids, and emptying of trash receptacles in common areas; note trash disposal violations by tenants/homeowners or businesses and report the violations to the owner/HOA for investigation shall be conducted.

N14 Common Area Drainage Facility Inspection. Privately-owned drainage facilities shall be inspected each year and, if necessary, cleaned and maintained prior to the storm season, no later than October 1st each year. Drainage facilities include catch basins and inlets, catch basin inserts, water quality basins, detention basins, other treatment facilities, and open drainage channels.

N 15 Street Sweeping Private Streets and Parking Lots. Streets shall be, swept prior to the storm season in late summer/early fall, no later than October 1st of each year. Parking lots at the private community center shall be swept weekly at a minimum, weather permitting. o Structural Source Control BMPs
 Provide Storm Drain Stenciling and Signage. All storm drain inlets and catch basins, constructed or modified, within the project area shall be stenciled or labeled. Signs, which prohibit illegal dumping, shall be posted at public access points along channels and creeks within the project area. Legibility of stencils and signs shall be maintained.
 Trash Area Design. Trash areas shall be paved, designed not to allow run-on, screened or walled to prevent off-site transport of trash; and covered to minimize direct precipitation. Common area litter control shall include a litter patrol, covered trash receptacles, emptying of trash receptacles in a timely fashion, 39 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
and noting trash violations by tenants/homeowners and
reporting the violations to the owner/HOA for investigation.

Connection of trash area drains to the municipal storm drain system shall be prohibited.
 Efficient Irrigation. The timing and application methods of irrigation water in common areas shall minimize the runoff of excess irrigation water into the storm water conveyance system.
 Protect Slopes and Channels. Storm water BMPs shall be included to decrease the potential for erosion of slopes and/or channels, and may include appropriate conveyance structures, landscaping, etc.
 Hillside Landscaping. Hillside areas that are disturbed by project development shall be landscaped with deep-rooted, drought tolerant plant species selected for erosion control.
 Fire Station. Catch basin inserts with hydrocarbon absorption mats shall be provided for the fire station and vehicle maintenance shall be performed indoors and shall therefore not enter into the storm drain system because indoor drains flow to the sanitary sewer system.
 Treatment Control BMPs: The following treatment control BMPs are a part of the conceptual water quality treatment program included in the Mountain Park Specific Plan (refer to Exhibit 3-10). Prior to the issuance of grading permits, the property owner/developer shall include the following features in the final WQMP submitted to the Department of Public Works for review and approval.
o Storm water runoff from the disturbance area shall be routed to nine water quality basins. Collectively, the water quality basins shall treat runoff from approximately 488 acres within the disturbance area. The water quality basins shall incorporate dry extended detention to provide water quality treatment for storm flows. Dry extended detention basins are designed with outlets that detain the runoff volume from the water quality design storm (e.g., the 85th percentile 24-hour event) for some minimum time 40 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
(36 hours) to allow particles and associated pollutants to settle out.
o The water quality basins shall incorporate wetland vegetation along the low flow channel in the bottom of the basin for the treatment of dry weather flows and small storm events. These basins shall not contain ponded or standing water for periods in excess of 48 hours.
o The park and school site shall have a water quality basin or BMP with equivalent treatment effectiveness with the sizing of the treatment based on the DAMP/LIP requirements.
o Per the MS4 permit, the water quality basins within the proposed project shall be designed to contain a "water quality pool" sized to meet the maximized storm water capture volume for the area, from the formula recommended in Urban Runoff Quality
Management, WEF Manual of Practice No. 23/ASCE Manual of Practice No. 87 (1998). The water quality pool is designed to drain in 36 hours.
o Approximately 4.1 acres of roadway that does not drain to the basins shall be treated with filter strips (a type of biofilter) designed per the MS4 permit and DAMP/LIP requirements treating a flow rate two times the 85th percentile hourly rainfall as determined by historical rainfall. The water tank located in Development Area 7 shall also be treated using a filter strip or a bioswale, designed per DAMP/LIP requirements.
o Offsite roadway improvements shall be treated by BMPs providing treatment equivalent to that provided by biofiltration (bioswales or filter strips) sized pursuant to the criteria in the MS4 permit.

3.6 Biological Resources
No project design features pertaining to biological resources identified in MMP No. 137 would apply to the Proposed Project.

3.7 Traffic and Circulation
PDF 7-1 The Mountain Park Specific Plan includes a circulation system consisting of on-site roadways (refer to Exhibit 4.7-5 of the Draft EIR included in Attachment A). The tentative tract or parcel maps submitted for review and approval, will incorporate preliminary street design features (i.e., Project Design
Feature would be
applicable to the
Proposed Project.

Department of Public
Works/Planning &
Building Department
Prior to approval of
each tentative tract
or parcel map.
41 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
cross-sections, alignment and grades) demonstrating consistency with the proposed circulation system. Prior to approval of each tentative tract or parcel map, the subdivision map shall be prepared consistent with the Mountain Park Specific Plan Circulation System Plan (Exhibit 4. 7-5 of the Draft EIR) to the satisfaction of the City Engineer. All street improvements within the subdivision map shall be completed prior to the final building and zoning inspection for units served by said improvement.

PDF 7-2 The Mountain Park Specific Plan includes a circulation system including the following off-site roadway improvements (refer to Exhibit 4.7-5 of the Draft EIR included in Attachment A) identified in the Mountain Park Specific Plan, the City of Anaheim General Plan and Orange County Master Plan of Arterial Highways. The development area plans and tentative tract or parcel maps, submitted for review and approval, shall incorporate preliminary street design features (i.e., cross-sections, alignment and grades) demonstrating that the proposed circulation system is consistent with that defined in the Mountain Park Specific Plan, the City of Anaheim General Plan and the Orange County Master Plan of Arterial Highways.
 Gypsum Canyon Road. Improved from a two-lane undivided roadway to a four-lane divided roadway from the SR-91 westbound off-ramp to the proposed Santa Ana Canyon Road realignment. A construction contract for improvements to this portion of Gypsum Canyon Road shall be awarded prior to issuance of the first building permit in development areas east of SR-241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development for areas east of SR-241.  Santa Ana Canyon Road. Realign and improve from a two-lane undivided roadway to a four-lane divided roadway from SR-241 to Gypsum Canyon Road. A construction contract for improvements to this portion of Santa Ana Canyon Road shall be awarded prior to issuance of the first building permit in development areas east of SR- 241. The improvements shall be substantially completed prior to the PDF 7-2 would be
applicable where
feasible for the
Proposed Project;
however, some of the
other roadways listed
in the PDF 7-2 may
pertain to the other
development areas in
the Specific Plan Area
and may not be
applicable.

Department of Public
Works/Planning &
Building Department
Shall be incorporated
into development
area plans and
tentative tract or
parcel maps prior to
submittal for
approval.
42 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
first final building and zoning inspection for the first phase of development for areas east of SR-241.
 Weir Canyon Road (Oak Canyon Drive to Blue Sky Way). Restripe approximately 600-feet to transition from a six-lane roadway at Oak Canyon Drive to a four-lane roadway at Blue Sky Way prior to issuance of the first building permit for Development Areas 3 or 7, whichever occurs first.
 Weir Canyon Road (Blue Sky Way to SR-241). Construct as a four-lane divided roadway from Blue Sky Way to SR-241 (includes elimination of the northbound left-turn lane at the Weir Canyon Road/Blue Sky Road intersection). Improvements to this portion of Weir Canyon Road shall be completed prior to the first final building and zoning inspection for Development Areas 3 or 7, whichever occurs first.
 Gypsum Canyon Road and SR-91 Westbound Ramp Intersection. Add second northbound through lane. A construction contract for improvements to this portion of intersection shall be awarded prior to issuance of the first building permit for development areas east of SR- 241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development for areas east of SR-241.
 Gypsum Canyon Road and SR-91 Eastbound Ramp Intersection. Add second northbound and southbound through lanes. A construction contract for improvements to this portion of intersection shall be awarded prior to issuance of the first building permit in development areas east of SR-241. The improvements shall be substantially completed prior to the first final building and zoning inspection for the first phase of development areas for east of SR-241.  Gypsum Canyon Road/Santa Ana Canyon Road Intersection. Improve to provide two southbound through lanes and a southbound right- turn lane, two northbound through lanes and a northbound left-turn lane, and two eastbound left-turn lanes and an eastbound right-turn lane. A construction contract for improvements to this intersection shall be awarded prior to the issuance of the first building permit in development areas east of SR-241. The improvements shall be 43 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
substantially completed prior to the first final building and zoning inspection for the first phase of development for areas east of SR-241.  Oak Canyon Drive, East of Running Springs Road. This portion of Oak Canyon Drive within City right-of-way will be abandoned by the City of Anaheim and improved with a vehicle maintenance road and landscaping (see Exhibit 3-17). The maintenance road will be gated to the satisfaction of the City Engineer. Improvements associated with this portion of Oak Canyon Drive within City right-of-way shall be substantially completed prior to issuance of the first building permit in development areas west of SR-241.

3.8 Air Quality
No project design features pertaining to noise were identified in MMP No. 137.

3.9 Noise
No project design features pertaining to noise identified in MMP No. 137 would apply to the Proposed Project.

3.10 Hazards and Hazardous Materials
PDF 10-1 Prior to the approval of the first tentative tract or parcel map, the property owner/developer shall enter into an agreement (Fire Protection Agreement) with the City of Anaheim. This agreement shall specify the property owner/developer's pro-rata fair share funding of capital improvements necessary to establish adequate fire protection facilities and equipment to service the proposed development. The property owner/developer shall be responsible for paying fees or otherwise providing for the design, construction and furnishing of the fire station, including all fire apparatus necessary to fully equip the fire station per the City's specifications, to adequately serve the project. The property owner/developer shall also be responsible for dedicating a parcel for development of the fire station in the location specified in Exhibit 3-4 of the Draft EIR (Development Plan) included in Attachment A. The fire station facility shall be constructed and operational prior to the issuance of the first building permit for any development area east of the SR-241, or as otherwise required by the Fire Department in the Fire Protection Agreement.

The Proposed Project
would be subject to a
Fire Protection
Agreement with the
City of Anaheim. This
PDF would therefore
be generally
applicable to the
Proposed Project and
would be
incorporated to some
extent.

Department of Public
Works/Planning &
Building Department
Prior to the approval
of the first tentative
tract or parcel map.

PDF 10-2 Prior to submittal of the first tentative tract or parcel map or approval of the first grading plan, whichever occurs first, the property owner/developer shall submit a final Fire Master Plan (FMP) to the Fire The Proposed Project
would adhere to the
Fire Master Plan
Department of Public
Works /Planning &
Prior to submittal of
each tentative tract
or parcel map or
44 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
Department for review and approval to ensure that fire protection for each Development Area is in accordance with Fire Department requirements. The final FMP shall be in substantial conformance with the preliminary FMP (Appendix R of the EIR). A copy of the approved Fire Master Plan shall be submitted to the following City Departments:

Planning, Police and Public Works.
prepared for EIR No.
331; therefore, this
PDF would be
applicable to the
Proposed Project and
would be
incorporated.

Building Department,
Fire Department
grading plan,
whichever comes
first.

PDF 10-3 The Mountain Park Specific Plan includes conceptual fuel modification strategies. Prior to submittal of each tentative tract or parcel map or grading plan, whichever occurs first, fuel modification plans shall be submitted to the Fire Department for review and approval. The fuel modification plan shall be prepared in accordance with the provisions of the California Fire Code in effect at the time of submittal of the tentative tract or parcel map and be based upon the criteria set forth in the City of Anaheim Fire Department Fuel Modification Plan Guidelines. Prior to final Certificate of Occupancy for the first building in each Development Area fuel modification zones shall be installed and inspected in substantial conformance with the approved plans to the satisfaction of the Fire Department.

Because the
Proposed Project
consists of an
irrigated lawn, the
Proposed Project
contains fuel
modification
strategies and this
PDF would remain
applicable to the
Proposed Project,
with the
consideration that
the Proposed Project
would not
necessitate any
Certificates of
Occupancy.

Department of Public
Works /Planning &
Building Department,
Fire Department
Prior to submittal of
each tentative tract
or parcel map or
grading plan,
whichever comes
first.

3.11 Population and Housing
No project design features pertaining to population and housing were identified in MMP No. 137.

3.12 Public Services and Utilities
PDF 12-2 The Mountain Park Specific Plan includes a Water System Sub Area Master Plan (SAMP) (refer to Exhibit 3-11 of the Draft EIR included in Attachment A). Prior to approval of each tentative tract or parcel map, the property owner/developer shall submit water improvement plans prepared in conformance with the SAMP to the Public Utilities Department for review and approval. The property owner/developer shall extend and construct the necessary water lines, pump stations, and Project Design
Feature is applicable
to the Proposed
Project.

Department of Public
Works /Planning &
Building Department,
Public Utilities
Department
Prior to approval of
each tentative tract
or parcel map.
45 M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024

G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
reservoirs to serve development phases prior to connecting to the City's water system.

PDF 12-3 Irrigation systems within the Mountain Park Specific Plan area shall be controlled by automatic programmable irrigation controllers that utilize California Irrigation Management System (CIMS) Data to adjust water times and durations based on daily evapotranspiration) data. Prior to approval of landscape plans, the property owner/developer shall provide verification in the form of notes on the plans to the Public Utilities Department, Water Engineering Division, that the irrigation system is in conformance with the system identified in the SAMP. Public Utilities Department shall confirm that it is in conformance with the irrigation system identified in the SAMP. Community wide irrigation control shall be provided by a centralized irrigation control system designed to separately valve hydrozones based on plant water requirements, exposure and terrain characteristics. All systems shall utilize matched precipitation rate nozzles and emitters for precise water application, adjustable low angle nozzles to reduce overspray, check valves to reduce low head drainage, and master valves to minimize water loss in the event of a line break or valve malfunction.

Project Design
Feature is applicable
to the Proposed
Project.

Department of Public
Works/Planning &
Building Department,
Public Utilities
Department
Prior to approval of
landscape plans.

PDF 12-5 The Public Facilities Plan provided in the Mountain Park Specific Plan identifies the electrical facilities to be constructed with the project. The project electric system is shown on Exhibit 3-13 of the Draft EIR included in Attachment A. Prior to approval of permits for improvement plans, the property owner/developer shall submit electric system plans to the Public Utilities Department, Electrical Engineering Division, demonstrating that the electric system is in conformance with the Public Facilities Plan included in the Mountain Park Specific Plan. The property owner/developer shall extend and construct the necessary facilities, including electric lines identified in Exhibit 3-13 of the Draft EIR (included in Attachment A), to serve development phases.

Project Design
Feature is applicable
to the Proposed
Project.

Department of Public
Works/Planning &
Building Department,
Public Utilities
Department,
Electrical Engineering
Division
Prior to approval of
permits for
improvement plans.

3.13 Recreation
PDF 13-1 The Mountain Park Specific Plan includes the implementation of the public Gypsum Creek Regional Riding and Hiking Trail (refer to Exhibit 3-8 of the Draft EIR, Open Space, Trail and Bikeway Plan). Prior to approval of each tentative tract or parcel map that the trail is located within, the Project Design
Feature would
remain applicable
where feasible to
Department of Public
Works/Planning &
Building Department,
Community Services
Prior to approval of
each tentative tract
or parcel map that
46 G YPSUM C ANYON C EMETERY P ROJECT

A NAHEIM , C ALIFORNIA
M ODIFICATIONS TO MITIGATION MONITORING P ROGRAM N O . 137 M AY 2024
Table 1.C: Applicability of Project Design Features Identified in MMP No. 137 EIR No. 331 Project Design Features Modifications Under Proposed Project
Responsible Party/
Approving Agency
Timing for Project
Design Feature
final alignment and final design for the Gypsum Creek Regional Riding and Hiking Trail shall be reviewed and approved by the Community Services Department and County of Orange Harbors, Beaches and Parks Department and shown on the tract or parcel map. An offer of dedication of trail easements to the County of Orange shall occur concurrently with recordation of final tract or parcel maps. Trail improvements shall be completed prior to final building and zoning inspections for the first building within said tracts.
ensure that these
project elements
would not affect the
existing OC Parks
Gypsum Canyon
Wilderness trailhead
(referred to in the
Approved Project as
Gypsum Creek
Regional Riding and
Hiking Trail).

Department, OC
Parks
the trail is located
within.

3.14 Cultural Resources
No project design features pertaining to cultural resources were identified in MMP No. 137.

G Y P S U M C A N Y O N C E M E T E R Y P R O J E C T

A N A H E I M, C A L I F O R N I A
A D D E N D U M T O T H E 2 0 0 5 C E R T I F I E D
E N V I R O N M E N T A L I M P A C T R E P O R T N O . 3 3 1 M AY 2 0 2 4

This page intentionally left blank