RESOLUTION NO. 2025-

A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF ANAHEIM ADOPTING THE FY 2025-26

PROJECT LIST FOR THE ROAD REP AIR AND
ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which must include a description and the location of each project, a proposed schedule for the proj,ect's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $9,087,347.00 in RMRA funding in FY 2025-26 from SB 1; and
WHEREAS, this is the ninth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects for the public; and
WHEREAS, the City has obtained and considered public input into the City's project list; and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the City's' priorities for transportation investment;. and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets at five neighborhoods and seventeen arterial streets throughout the City in FY 2025-26; and WHEREAS, the SB 1 project list and overall investment in City's local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete street infrastructure, and using cutting-edge technology, materials and practices, will have significant positive benefits citywide
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Anaheim does hereby resolve as follows:

1. The foregoing recitals are true and correct.

2. The City of Anaheim is adopting the list of projects attached hereto as Exhibit "A" planned to be funded with Fiscal Year 2025-26 with Road Maintenance and Rehabilitation Account Act revenues, which includes new and relisted projects.

3. The City of Anaheim hereby adopts the Fiscal Year 2025-26 project list in Exhibit "A." THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this day of , 2025, by the following roll-call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

CITY OF ANAHEIM
BY:

MAYOR OF THE CITY OF ANAHEIM
ATTEST:

CITY CLERK OF THE CITY OF ANAHEIM
151724.2
EXHIBIT "A"
City of Ana he im
FISCAL YEAR 2025- 26 PROJECT LIST FOR THE ROAD REPAIR AND ACCOU NTABIL ITY ACT OF 2017 Projec t Locat ion
PROJECTS ADOPTED IN FY 2024-25 AND CARRIED OVER (RELISTED) FOR FY 2025-26 (Distr ict 5) - Bet h Jackson Neighbor hoo d - border ed by Frontera Stree t to t he nor t h, t he Santa Ana River to t he east, Linco ln Avenue to t he sou t h, an d t he SR-57 freeway to t he wes t (Distr icts 2 & 4) - Juno Neighbor hoo d - bor dere d by Ball Road to t he nor t h, Wa lnut Stree t to t he east, Kate Ila Avenue to t he sou t h, and Euclid Stree t to t he wes t
(Distr ict 4) - No rma Ne ighbor hoo d - bor dere d by Kate Ila Ayenue to t he nor t h, Ha rbor Bou levar d to t he east, Orang ewoo d Avenue to t he sou t h, an d Nin t h Stree t to t he wes t
(Distr ict 3) - Har bor Bou levar d fro m Linco ln Avenue to Nor t h Stree t (Distr ict 2) - Ba ll Road from Mag nolia Avenue to Gilber t Stree t NEW PROPOSED PROJECTS LISTED FOR FY 2025-26
(Distr ict 2) - bor dere d by t he 1-5 Freeway to t he nor th, Euclid Way to t he east, Linco ln Avenue to t he sou t h, an d Belinda Circle to t he wes t
(Distr ict 2) - bor dere d by Linco ln Avenue to t he nor t h, Gi lber t Street to t he east, Orang e Avenue to t he sou t h, an d Mag nolia Avenue to t he wes t
(Distr ict 1) - Mag nolia Avenue from Linco ln Avenue to La Palma Avenue
(Distr ict 2) - Orang e Avenue from Mag no lia Avenue to Euclid Stree t (Distr ict 3) - Broa dway from Euclid Stree t to Harbor Bou levar d , (Distr ict 4) - Manc hester Avenue from City Limit (Sout h) to Ana heim Bou levar d
Projec t Descr ipt ion
The p rojec t imp rovemen ts inc lude remov ing an d recons truc t ing t he p avemen t in t he roadw ay, app ly ing slurry seal, rep lacing damag ed areas of concre te (s idewa lk, cur b and gutter, an d access ramp s), rep lacing signs, pavemen t str iping an d p avemen t mar kings.

The p roj ect imp rovemen ts inc lude remov ing an d recons truc t ing t he p avemen t in t he roadway, app lying slurry seal, rep lacing damag ed areas of concre te (s idewa lk, cur b and gutter, an d access ramp s), r eplacing signs, p avemen t str iping an d pavemen t mar kings.

The p roj ect imp rovemen ts inc lude remov ing an d recons truc t ing t he p avemen t in t he roadway, app lying slurry seal, rep lacing damag ed a reas of concre te (s idewa lk, c ur b and Igutter, an d access ramp s), rep lacing signs, p aveme nt str ip ing an d pavemen t mar king s.

Plans, Specifica t ions, an d Est imates are being p repared du ring t he Pre -Construc t ion per iod. The roa d re habilita t ion wor k consists of co ld p laning, resur fac ing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pavemen t mar kings.

Plans, Specifica t ions, an d Est ima tes are being p repare d dur ing t he Pm -Construc t ion per iod. The ro ad re habilita t ion wor k consists of co ld p laning, resur facing t he ro ad w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pavemen t mar kings. ( Partn ers hip w it h Sewer )
The p rojec t imp rovemen ts inc lude remov ing an d recons truc t ing t he pavemen t in t he roadway, app lying slurry seal, rep lacing damag ed areas of con crete (sidewa lk, cur b and gutter, an d access ramp s), rep lacing signs, pavemen t str iping an d p avemen t mar kings.

The p rojec t imp rove men ts include remov ing an d recons truc t ing t he p avemen t in t he roadway, app ly ing slurry seal, rep lacing damag ed areas of concre te (sidewa lk, cur b and gutter, an d access ramp s), rep lacing signs, pavemen t str iping an d p avemen t mar kings.

Plans, Specificat ions, an d Est imates are being p rep ared dur ing t he Pre -Construc t ion per iod. The roa d re habilita t ion wor k cons ists of co ld p lan ing, resur facing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pavemen t mar kings.

Plans, Specific at ions, an d Est imates are being p rep ared dur ing t he Pre-Construc t ion per iod. The roa d re habilita t ion wor k cons ists of co ld p lan ing, resur facing t he roa d w it h an asphalt con crete over lay, an d t he rep lacemen t of tra ffic str iping, tr affic signal loop s, an d paveme nt m arkings.

Plans, Specificat ions, an d Est imates are being p repared dur ing t he Pre-Construc t ion per iod. The roa d rehabilita t ion wor k cons ists of co ld p lan ing, resur facing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pavemen t mar kings.

Plans, Specificat ions, an d Est imates are being p rep ared dur ing t he Pre-Construc t ion per iod. The roa d re habilita t ion wor k cons ists of co ld p lan ing, resur facing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pave men t mar kings.
2 ._.

U.I D A A A th" ,
Construc t ion Schedu le
2, U0
i .
r , i
Estimated Start
Date (Mo-Yr)
Feb-25
., - ,
Sep-25
Oct- 25
c
2,
L
g t k
Sep-25
Dec-25
Dec-25
Pre-Constru ct ion Schedu le
7 1 1
'ilz ‹ - z •-• I n
2 ,g, g .:. . Z > . , Y
Est imated Start
Date (Mo-Yr)
--- z z z 2
Ap r-24
- -- z z 8 z 8 z
Broadway Rehabilita t ion Nov -24
Nov -24

PROJECT TITLE
Bet h Jackson Ne ighbor hoo d Stree t
Rehabilita t ion
Juno Ne ighbor hood Street
Rehabilita t ion
Nor ma Ne ighbor hood Stree t
Rehabi litat ion
Harbor Bou levar d Rehabilita t ion
Ball Road Rehabilita t ion
Mon terrey Ne ighbor hood Stree t
Rehabilita t ion
Baker Neighbor hoo d Stree t
Rehabilita t ion
Mag nolia Avenue Rehabilita t ion
Orang e Avenue Rehabilita t ion
L305 I 5769 Manc hester Avenue Rehabi lita t ion
* 1 8 g 0
811
d
D
z c
:11 rn' ‘ -..8. o . r., '4 ,T, ,F"
Projec t Locat ion
(Distr ict 5) - La Pa lma Avenue from W hite Star Aven ue to Mi ller Stree t
(Distr ict 6) - San ta Ana Cany on Road from Imp er ial Highway to Fairmon t Boulevar d
(Distr ict 1) - Wes tern Av e from City Lim it (North) to City Lim it (Sout h)
(Distr ict 3) - Ana heim Shores Dr ive from La Pa lma Avenue to Euclid Stree t
(Distr ict 3) - Har bor Bou levar d from Sout h Stree t to Linco ln Avenue & from Nort h Stree t to City Limit (Nor t h)
(Distr ict 4) - Har bo r Boulevar d from Chapman Avenue to Conven t ion Way
(Distr ict 5) - Placent ia Avenue from State College Bou levar d to t he SR-91 Br idge
(Distr ict 6) - Mira loma Avenue ( Mi lle r Stree t to Van Buren Stree t); Van Buren Stree t (Mira lom a Avenue to La Palma Avenue ); Corona do Stree t (Jefferson Stree t to Van Buren Stree t); Jefferson Stree t (Tust in Avenue to Mira loma Avenue )
Projec t Descript ion
Plans, Specificat ions, an d Est im ates are being p rep ared dur ing t he Pre -Construc t ion per iod. The roa d re habilita t ion wo rk cons ists of co ld p lan ing, resur fac ing t he roa d w it h an asphalt concr ete ov er lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pavem ent mar kings.

Plans, Specificat ions, an d Est imates are being p rep ared dur ing t he Pre -Construc t ion per iod. The roa d re habilita t ion wor k consists of co ld p laning, resur fac ing t he roa d w it h an asphalt conc rete over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pavemen t mar kings.

Plans, Specifica t ion s, an d Est imates are being p rep ared dur ing t he Pre -Construc t ion per iod. The roa d re habilita t ion wo rk consists of co ld p laning, resur facing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal bop s, an d pavemen t mar kings.

Plans, Specifica t ions, an d Est ima tes are being p rep ared dur ing t he Pre-Construc t ion period. The roa d re habilita t ion wo rk consists of c old p laning, resur facing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str ip ing, tra ffic signal loop s, an d pavemen t mar kings.

Plans, Specifica t ions, an d Est imates are being p rep ared du ring t he Pre-Construc t ion per iod. The roa d re habilita t ion wor k cons ists of co ld p lan ing, resur facing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str ip ing, tra ffic signal loop s, an d pavemen t mar kings.

Plans, Specifica t ions, an d Est imates are being p rep ared dur ing t he Pm -Construc t ion per iod. The roa d re habilita t ion wor k cons ists of co ld p lan ing, resur facing t he ro ad w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str ip ing, tra ffic signal loop s, an d pavemen t mar kings.

Plans; Specificat ions, an d Est imates are being p rep ared dur ing t he Pre-Constr uct ion period. The roa d re habilita t ion wor k consists of co ld p lan ing, resur facing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t o f tr affic str iping, tra ffic signal loop s, an d pavemen t mar kings.

Plans, Specifica t ions, an d Est imates ar e being p repared du ring t he Pre-Construc t ion per iod. The roa d re habilita t ion wo rk consists of co ld p laning, resu rfacing t he roa d w it h an asphalt concre te over lay, an d t he rep lacemen t of tra ffic str iping, tra ffic signal loop s, an d pavemen t mar kings.
,
Construc t ion Schedu le
•1,-,Eli
- 8 8
g 1°,
.
o o o o
rs,
o
. ,..,
o
i ; -. '
1 .. E z ... g
Sep-25
Sep-25
— E — — ,
9Z-Unr
c = 2,
,
—
Pre-Constru ct ion Schedu le
g 1.. E.
- U0
-, k ','E ‘4, •;ii ^. ,_ ..,' ,L'E,
Estimated Start
Date (Me-Yr)
Nov-24
4 Ap r-25
L 4 L• <
^, —,_ 4
Ap r-25

PROJECT TITLE
5773 , La Palma Avenue Rehabilita t ion
Santa Ana Cany on Road
Rehabilita t ion
Western Avenu e Rehabilita t ion
Ana heim Shores Dr ive Rehabilita t ion
Harbor Bou levar d Rehabilita t ion
Harbor Bou levar d Rehabilita t ion
Placent ia Avenue Rehabilitat ion
Mira loma Aven ue,Van Bure n Stre et;
Corona do Stree t; Jefferson Stree t
Rehabilita t ion
V, 1 . 17:' g
,', ',f;
L',
0, ..°' ., 0'43., 06; L , ,
. .0 , r ,
d z
m
w O

← All documents from this meeting