CITY OF ANAHEIM
REQUEST FOR PROPOSALS TO PROVIDE CONSULTING
INSPECTION SERVICES
DEPARTMENT OF PUBLIC WORKS – CONSTRUCTION
SERVICES DIVISION
MAY 30, 2025
COVER LETTER May 30, 2025 Samantha Bahena, Contract Administration City of Anaheim – Department of Public Works Construction Services Division 200 S. Anaheim Boulevard, Suite 276 Anaheim, CA 92805 Subject: Proposal for Request for Proposals to Provide Consulting Inspection Services Dear Ms. Bahena & Selection Committee, Z&K Consultants, Inc. (Z&K) is pleased to submit our proposal to the City of Anaheim in response to the Request for Proposals for Consulting Inspection Services. As a certified Disadvantaged Business Enterprise (DBE), Women-Owned Business Enterprise (WBE), and Small Business Enterprise (SBE) based in Southern California, Z&K specializes in Construction Inspection, Construction Management, Pre-Construction Inspection, Construction Administration, and Staff Augmentation Services. Competency in Relevant Sub-Disciplines | Z&K’s inspection team is highly experienced in a broad range of sub-disciplines outlined in the RFP, including roadway resurfacing, underground utilities, storm drains, traffic signals, and public facility improvements. Our inspectors are well-versed in performing field inspections, tracking progress, and ensuring safety and environmental compliance. We have supported municipalities across Southern California with services including pavement rehab, street reconstruction, utility installations, and park upgrades. Our team regularly works under tight timelines, in sensitive areas, and across all project phases — from constructability reviews through closeout — always representing public agencies with professionalism. Familiar with Caltrans and Greenbook standards, as well as NPDES and federal funding compliance, Z&K maintains detailed reporting, photographic documentation, and cloud-based records. Our inspectors also coordinate with utilities and third parties to support punch lists, meetings, and issue resolution throughout project delivery. Highly Qualified Personnel | The individuals proposed for this contract possess extensive field experience, technical knowledge, and a range of certifications relevant to municipal infrastructure inspection. These include ICC, QSP, QSD, OSHA 30, ACI certifications, and Professional Engineer (PE) licensure where applicable. Our support team comprises highly experienced engineers, construction managers, project managers, and inspectors with decades of collective knowledge in planning, oversight, and delivery of municipal capital projects. Many of our team members have led efforts across the entire project lifecycle—from design coordination and constructability reviews to field inspection, contractor management, stakeholder engagement, and project closeout. This depth of experience allows Z&K to anticipate field issues, uphold agency expectations, and maintain rigorous documentation throughout. Our team includes experienced lead inspectors, senior field staff, and a dedicated Account Manager who will serve as the primary point of contact for all assignments. Proven Track Record with Municipal Agencies | Z&K has delivered over 75 inspection-related contracts in the past five years, including 58 active on-call agreements with agencies across Southern California. We have extensive experience with federally funded projects and compliance with Caltrans, Greenbook, and NPDES requirements. Our staff ensures efficient coordination, documentation, and communication across all phases of inspection. Z&K is known for dependable service, accurate reporting, and strong support through audits and closeouts. Our high-quality, adaptable inspection services have built lasting partnerships with public agencies throughout the region. Approach and Methodology | Z&K delivers consistent results through a combination of technical proficiency, structured internal systems, and a hands-on management approach. We offer professional services that span the full construction timeline—from constructability reviews and permit coordination in pre-construction, to coordination with contractors and vendors during construction, and final reporting and documentation during closeout. We provide comprehensive project support that includes oversight of budgets, schedules, team coordination, and communication among stakeholders to ensure alignment with project goals and specifications. Our services encompass all phases of project delivery, including pre-construction planning, field coordination, administrative tracking, and post-construction closeout. We utilize standardized QA/QC workflows, mobile-enabled reporting tools, and cloud-based systems to ensure timely and accurate performance, as well as transparent coordination across project phases and stakeholders.
Z&K has successfully held over 75 similar Contracts in the past 5 years and currently holds 58 On-Call Contracts providing similar services in the last 5 years.
Commitment of Key Personnel | Our proposed personnel are fully available to support Anaheim’s needs. We anticipate assigning full-time inspection staff to projects as needed, with the flexibility to accommodate swing shifts, weekends, or night work. Each team member’s time commitment and expected level of involvement are detailed in the Project Team section of our proposal. Z&K is structured specifically to support concurrent project demands. We maintain a team of cross-functional professionals capable of adapting to project scope and complexity. This enables us to scale staffing levels based on task order volume and dedicate experienced personnel to long-term assignments while remaining agile enough to provide support for short-term or urgent projects. Our resources include dedicated project vehicles, mobile reporting tools, standardized documentation templates, scheduling software, and full in-house administrative support. Project staff are regularly trained in client-specific processes, and our executive leadership remains directly involved in quality assurance and resource planning. Z&K has the operational capacity, technical depth, and administrative infrastructure to meet the City’s needs across multiple projects simultaneously. Reasonable, Transparent Fee Structure | Our rate schedule reflects fully burdened hourly rates that are competitive, inclusive of vehicle costs, safety gear, mobile equipment, and administration. Overtime, weekend, and night shift rates are clearly listed to allow for transparent planning and budgeting. Strong References and Technical Competence | We have included contact information for recent and relevant municipal clients who can speak to our firm’s performance, technical knowledge, and collaborative spirit. Their projects reflect similar scopes, timelines, and expectations to those outlined in this RFP. Z&K staff have extensive experience interpreting and applying relevant regulatory and technical standards governing municipal infrastructure. We are fully versed in the Caltrans Standard Specifications, the Greenbook (Standard Specifications for Public Works Construction), MUTCD guidelines, ADA design requirements, and MS4 and stormwater permit compliance procedures. Our team is well-versed in federal funding documentation, CEQA/NEPA interfaces, and public contracting best practices, depending on project complexity and funding source. Our firm recognizes that each city has its own policies and procedures, and Z&K prides itself on integrating seamlessly with existing workflows. Having worked extensively with agencies throughout the region, we are accustomed to adjusting to client-specific formats for reporting, scheduling, invoicing, and issue escalation. The Z&K Team offers many unique strengths and advantages for this contract, including: ü Strong Track Record – Our extensive portfolio demonstrates our ability to successfully manage complex projects across Southern California. ü Thorough Project Knowledge – Our team will conduct multiple site visits and review project documents, ensuring a deep understanding of existing conditions and requirements. ü Technical Expertise – Our expertise in construction inspection and stakeholder engagement allows us to proactively address project challenges. ü Certified Professionals – Our team holds required licenses, including PE, ICC Cert., QSD/P and ACI. ü Responsiveness and Flexibility – Z&K’s staffing structure allows us to respond to urgent or evolving project needs, ensuring timely and seamless support under dynamic field or administrative conditions. ü Efficiency in Project Budgeting – Our team excels in managing project costs, optimizing resources, and maintaining financial accountability to ensure projects are delivered on time and within budget. ü Clear and Consistent Communication – We prioritize proactive communication, detailed documentation, and a collaborative approach to resolving challenges with City staff and project stakeholders. Z&K Consultants, Inc. acknowledges and accepts the provisions outlined in the City of Anaheim’s Second Amended and Restated Community Workforce Agreement (CWA). We are prepared to comply with all CWA requirements applicable to covered “Project Work,” including signing the required Letter of Assent, coordinating with union representatives, and contributing to the applicable benefit trust funds. Our team has experience operating under similar workforce agreements and is well-versed in ensuring proper implementation and compliance throughout project delivery. Z&K Consultants, Inc. is the submitting entity for this proposal. I, Crystal Fraire, PE, serve as President and Account Manager, and am fully authorized to commit Z&K contractually. This proposal is valid for 180 days from the due date. We acknowledge receipt of Addendum No. 1 (dated May 22, 2025) and confirm our full acceptance of the RFP terms without exceptions. All communications regarding this proposal should be directed to me at the contact information below. We appreciate the opportunity to support the City of Anaheim and look forward to contributing to your continued success. Sincerely, Crystal Fraire, PE President (Principal-in-Charge), Account Manager 17130 Van Buren Blvd. #122, Riverside, CA 92504 (951) 310-7470 | [email protected] Zack Faqih, PE, QSD/P Vice President 17130 Van Buren Blvd. #122, Riverside, CA (949) 637-5040 | [email protected]
TABLE OF CONTENTS
A. Firm Overview ....................................................................................................................... 1 B. Understanding of Scope of Work ......................................................................................... 3 C. Project Team ........................................................................................................................... 8 D. Relevant Experience of the Team ........................................................................................ 13 E. Fee Schedule ......................................................................................................................... 19 F. Litigation ................................................................................................................................ 19 G. References ............................................................................................................................ 19 Appendices
Appendix A .................................................................................................................... Resumes Appendix B ................................................................................ Addendum Acknowledgement
A. FIRM OVERVIEW
A. FIRM OVERVIEW
Z&K Consultants, Inc. is a leading consulting firm dedicated to delivering high-quality services tailored to meet the unique needs of public clients. Established with the mission of supporting municipalities through trusted infrastructure consulting, Z&K has cultivated a reputation for precision, reliability, and integrity across hundreds of projects throughout California. Our work is rooted in a client-first approach, emphasizing accountability, partnership, and results.
As a certified Disadvantaged Business Enterprise (DBE), Women’s Business Enterprise (WBE), and Small Business Enterprise (SBE), Z&K is committed to promoting diversity and equity in public contracting. Our firm is headquartered in Riverside and has extensive operational reach throughout Southern California. We specialize in Construction Inspection, Project Management, Construction Management, Engineering, Construction Administration, Pre -Construction Inspection, and Staff Augmentation Services. Each of these services is designed to scale with the needs of our public -sector clients and delivered by highly qualified personnel who are experts in their disciplines.
Our firm’s project portfolio ranges from small -scale municipal upgrades to large, multi- phase regional infrastructure programs. Z&K has successfully delivered projects involving water and wastewater pipelines, pressure -reducing stations, roadway realignments, storm drain improvements, and complete streets initiatives. Our proven ability to manage infrastructure projects of varying scope and complexity —while maintaining strict adherence to compliance standards, proactively mitigating risk, and optimizing project efficiency—has established Z&K as a reliable and valued partner to cities, counties, and water districts throughout Southern California.
We share the City of Burbank’s commitment to accountability, public safety, and efficient delivery of essential infrastructure improvements. Z&K is submitting for all service categories under Construction Management , including Building Inspection and Construction Inspection.
GENERAL INFORMATION
Full Legal Name | Z&K Consultants, Inc. (No Prior Company Names) Address | 17130 Van Buren Blvd. #122, Riverside, CA 92504 Office Locations | Riverside, Los Angeles, Orange (Branch Office), and San Bernardino Counties Phone & Fax | (951) 310-7470, Fax: N/A
Email & Website | [email protected]; www.zandkconsultants.com
Organizational Structure | Z&K Consultants, Inc. is a California C Corporation. As a corporation, we offer a scalable structure with clear lines of accountability, supported by a deep bench of experienced staff. Our organization includes licensed civil engineers, project managers, a nd technical support personnel who specialize in municipal engineering and land development oversight.
Account Manager | Crystal Fraire, PE, President/Principal-in-Charge, (951) 310- 7470, [email protected], 17130 Van Buren Blvd. #122, Riverside, CA 92504 Persons Authorized to Make Commitments | Crystal Fraire, PE, President/Principal-in-Charge & Zack Faqih, PE, Vice President
Firm History & Length of Relevant Experience | Z&K Consultants, Inc. was founded in 2009 with a mission to provide high -quality project management, construction management, engineering, and inspection services to public and private clients. Over the years, we have built a reputation for delivering infrastructure projects with precision, efficiency, and cost -effectiveness. Operating under the name Z&K Consultants, Inc. for over 15 years, the firm has consistently provided construction management, inspection, engineering, and related services.
Current Number of Employees | Z&K Consultants employs over 90 professionals, including licensed engineers, project managers, inspectors, and support staff. For this contract, Crystal Fraire will serve as the dedicated Account Manager, supported by our in-house team. This local team includes support staff such as technical support and administrative staff available to provide coordination, documentation, and technical support to ensure seamless service delivery.
Z&K Consultants, Inc. maintains a flexible and responsive staffing approach to ensure that the appropriate personnel are available to meet project demands. Our proposed team members have been carefully assigned to this project with sufficient bandwidth to dedicate their expertise, ensuring seamless project oversight and on-time deliverables. In the event additional resources are required, we have readily available staff who can provide immediate support to maintain project continuity and efficiency. Z&K Consultants, Inc. takes no exceptions to the City’s scope, specifications, terms, or conditions as outlined in the RFP, including all issued addenda and Q&A responses.
B. UNDERSTANDING OF
SCOPE OF WORK
B. UNDERSTANDING OF THE SCOPE OF WORK
The City of Anaheim is seeking qualified firms to provide as-needed Construction Inspection Services in support of its capital improvement program. These services are critical to ensuring the successful delivery of a diverse range of public works projects, including roadway rehabilitation, underground utilities, stormwater management systems, traffic signal installations, and public facility upgrades.
Z&K Consultants, Inc. understands that the City requires responsive, knowledgeable, and experienced inspectors who can uphold Anaheim’s standards, protect public assets, and ensure compliance with all applicable federal, state, and local regulations. This includes coordination with contractors, third-party utilities, City departments, and the general public, while maintaining accurate documentation and fostering a collaborative working environment in the field.
We recognize that many of Anaheim’s capital projects are time-sensitive, publicly visible, and may involve federally funded or CWA-covered work, requiring inspectors who are not only technically competent but also administratively meticulous.
Our team is experienced in supporting construction sites subject to NPDES stormwater regulations, Caltrans Local Assistance Procedures, Prevailing Wage requirements, and the City’s Quality Assurance Program (QAP). In addition, we understand the City may deploy consultant inspectors on both City-led projects and private development review, requiring adaptability, strong communication skills, and the ability to document issues effectively while maintaining a professional rapport with both internal and external stakeholders.
Key elements of our project understanding include:
ü The need for flexible deployment, often on short notice, to match project demands ü The importance of accurate, timely, and complete documentation, including daily reports, photos, working day statements, and punch lists
ü The value of proactive communication between inspectors, City project managers, contractors, and third parties ü The role of inspection staff in ensuring contractor adherence to plans, specifications, safety protocols, and environmental compliance
ü The requirement for compliance with the City’s CWA, including submission of the Letter of As sent and proper coordination with union referrals and benefit requirements Z&K is prepared to support Anaheim with experienced, fully certified inspectors who can integrate seamlessly into the City's workflow, represent the City professionally in the field, and support the successful delivery of high -quality infrastructure projects throughout the City.
APPROACH AND ABILITY TO ADMINISTER THE AGREEMENT
Z&K approaches the administration of on-call agreements with a strong emphasis on responsiveness, accountability, and partnership. We understand the importance of being a seamless extension of the City of Anaheim’s Construction Services Division, providing not only qualified field personnel but also structured internal support to ensure consistency, efficiency , and compliance across all task orders. Our agreement administration strategy includes the following key elements:
Dedicated Account Management | Crystal Fraire, PE will
serve as the Account Manager and Principal -in-Charge,
acting as the City’s single point of contact for all contractual, personnel, and performanc e-related matters. She will
oversee the deployment of field staff, coordinate start -up requirements, and ensure City expectations are consistently met. All communication, reporting, and adjustments to
staffing levels or assignments will flow through her to ensure clarity and responsiveness.
Ongoing Contract Monitoring | Z&K’s leadership conducts periodic internal reviews of staffing performance, deliverable timeliness, and contractual compliance. Any issues
identified—whether through our own reviews or City
feedback—are addressed immediately. We track personnel
certifications and training requirements to ensure compliance with current standards and CWA obligations.
Flexible Resource Management | Our organizational
structure and capacity allow us to suppo rt multiple projects simultaneously without compromising quality or availability.
We maintain cross-trained personnel who can shift between inspection types and are capable of working night shifts, weekends, or on accelerated schedules when necessary.
Standardized QA/QC and Documentation Systems | To
support consistency and quality, Z&K uses standardized
templates and checklists for daily reports, working day statements, photographic logs, and punch list tracking. All inspectors are trained in these procedures during onboarding and are monitored throughout their assignments to ensure accuracy and completeness. These tools also allow for easy integration with the City’s document management systems.
Streamlined Staffing and Mobilization | Z&K maintains a robust roster of prequalified inspectors and support staff who can be assigned to City projects. Once a task order is issued, we respond promptly with personnel who are familiar with City protocols and expectations. Each inspector is supported by our internal management team, which provides technical oversight and logistical coordination.
CWA and Labor Compliance Integration | Z&K has deep
experience operating under CWA and understands the
documentation and reporting required to remain compliant.
We are fully pr epared to coordinate with union
representatives, manage benefit contributions, and ensure all covered personnel execute the required Letter of Assent before performing any covered work.
IDENTIFYING AND RESOLVING PROJECT PROBLEMS | Z&K Consultants employs a proactive and structured approach to effectively identify, track, and resolve project issues across all phases, minimizing impacts to schedule, budget, and quality.
Issue Identification | Our team continuously monito rs project conditions through regular inspections, progress meetings, and constructability reviews. We utilize advanced project management software to maintain detailed issue logs, ensuring timely awareness and transparency.
Approach to Resolution | When i ssues arise, we swiftly evaluate their scope, impacts, and resolution options.
Emphasizing open communication, we engage stakeholders
to collaboratively develop and implement practical solutions.
By evaluating alternatives such as schedule adjustments, resource reallocations, or design refinements, we ensure issues are addressed promptly and cost-effectively.
Handling Unforeseen Problems | Z&K is experienced in
addressing unforeseen challenges. Upon encountering
unexpected situations, we quickly assess impacts, consult relevant stakeholders, and develop actionable strategies.
Innovative Techniques | We utilize advanced technologies, including drone monitoring and predictive analytics, to anticipate and mitigate risks proactively. Real -time drone imagery provides rapid insights into site conditions, aiding quick decision -making. Predictive analytics help identify potential issues before they materialize, allowing preemptive action. Our integrated project tracking system flags variances in schedule, budget, and quality, enabling immediate
interventions.
Conflict Resolution Process | Z&K fosters a collaborative and solutions- oriented conflict resolution approach. We facilitate open dialogue among stakeholders, promoting clear understanding and consensus -driven outcomes. Our
emphasis on transparency and mutual benefit effectively reduces conflicts, preserves project relationships, and keeps projects moving toward successful completion.
APPROACH TO PROJECT CONTROLS | Z&K employs a comprehensive and systematic approach to project controls that ensures the efficient tracking of progress, management of expenditures, and maintenance of critical documents. We combine traditional methods with modern technology to ensure the project remains on track, within budget, and in compliance with all contract requirements.
ü Tracking Project Progress | We utilize project management software to track milestones, work completion, and resource allocation. Daily field inspections, coupled with weekly progress meetings, allow us to address delays, forecast risks, and adjust schedules as needed.
ü Managing Expenditure | Z&K maintains detailed cost tracking systems to monitor labor, materials, and equipment costs.
We conduct regular cost reviews and perform val ue engineering to identify potential savings, ensuring that the project stays within its budget.
ü Maintaining Critical Contract Document | We maintain an organized digital filing system for contracts, submittals, change orders, and permits, ensuring all documents are easily accessible and compliant with City standards. This system supports efficient approvals and auditing.
ü Contract Administration and Monitoring | Our contract administrators ensure that all contractors comply with project terms, including sch edule and budget. Regular contract reviews ensure that work aligns with specifications and that discrepancies are addressed promptly.
APPROACH AND ABILITY TO COMPLY WITH THE CWA
Z&K Consultants, Inc. fully understands the requirements and obligations set forth in the Second Amended and Restated Community Workforce Agreement (CWA) between the City of Anaheim and the Los Angeles/Orange Counties Building and Construction Trades Council. Our team is well -versed in administering agreements of this nature and has developed protocols to ensure seamless compliance for all covered “Project Work.” Letter of Assent and Binding Requirements | Z&K will execute and submit the required Letter of Assent (Attachment A of the CWA) prior to commencing any covered work and will require the same from any applicable subcontractors. We recognize that this letter is the formal mechanism for agreeing to all terms and conditions of the CWA and understand that it is mandatory for any firm performing covered work exceeding the thresholds set forth in Section 2.2 of the agreement.
Core Workforce Procedures | Z&K is prepared to comply with Section 3.8 of the CWA, which outlines the process for identifying and using “core employees” for covered work. Our team maintains complete document ation (payroll records, licenses, employment verification) to support core status eligibility and will submit core lists to the CWA Administrator and Trades Council as required.
Union Hiring Hall Coordination | We will follow union hiring hall referral procedures outlined in Section 3.3, and we have experience working collaboratively with multiple trade unions to fill craft positions quickly and responsibly. Should the hiring hall be unable to fill a request within 48 hours, Z&K will follow proper steps to source from alternate channels, as permitted by Section 3.9.
Fringe Benefits and Trust Fund Contributions | Z&K will sign Subscription Agreements with applicable labor trust funds (per Section 1.12 and Section 2.7) and make fringe benefit contributions on behalf of non- union employees performing covered work. These costs are included in our fully burdened billing rates, and our finance department is trained to track, report, and certify these payments as required.
Local Hire Goals and Reporting | Z&K supports the CWA’s goals to promote local hiring and will actively work with union representatives to identify and dispatch Local Hires, Veterans, and Disadvantaged Individuals per Section 3.5. We maintain internal tracking logs aligned with the Craft Request Form (Attachment C), which we will use for reporting compliance and performance to the City and the CWA Administrator.
Pre-Job Conferences and Oversight | Prior to starting any task order, Z&K will participate in Pre -Job Conferences with affected unions and will disclose work assignments in accordance with Article 16. Our leadership team is experienced in pre-job participation and documenting jurisdictional clarity to minimize disputes and ensure CWA alignment from project initiation.
Z&K is fully committed to CWA compliance and has the internal infrastructure, experience, and understanding to manage all labor-related obligations, including benefit remittance, union coordination, workforce tracking, and documentation. We view the CWA not as a constraint but as a collaborative framework to ensure a skilled workforce, project stability, and alignment with the City’s broader economic and labor goals.
METHODS FOR INTERFACING WITH CITY STAFF & VARIOUS CITY DEPARTMENTS Z&K prioritizes proactive, transparent coordination with all project stakeholders to ensure timely decision-making, minimize delays, and maintain compliance throughout the project lifecycle. Our approach begins with clearly identifying all involved parties—City departments, Caltrans, utility companies, and permitting agencies—and developing a tailored communication strategy for each project. Our team will:
• Coordinate directly with Caltrans for Local Assistance procedures, encroachment permits, and LAPM documentation. • Work with utility providers (e.g., SoCal Edison, Frontier, Spectrum, gas, water) to verify utility clearances, schedule relocations, and resolve field conflicts quickly.
• Maintain regular coordination with City staff through standing weekly meetings, field updates, and milestone check- ins to ensure alignment on priorities, issues, and documentation.
We also track agency approvals and utility coordination in the project schedule to identify dependencies early and avoid delays. For public -facing concerns, we collaborate with the City to address stakeholder issues and provide updates to affected businesses and residents. Our familiarity with regional procedures and long-standing agency relationships enables Z&K to resolve issues efficiently and maintain steady progress across all project phases.
PUBLIC COORDINATION AND COMMUNITY RELATIONS APPROACH | Effective public and interagency coordination is critical to delivering successful on-call construction management services. Z&K Consultants understands the importance of engaging residents, businesses, utilities, and regulatory partners from the outset of each assignment. Our approach is built on transparency, accessibility, and responsiveness. By working closely with City staff—including the Communications Team—we ensure consistent messaging and community trust from pre-construction through project completion.
Stakeholder Identification and Engagement | Z&K will maintain a detailed stakeholder database including local businesses, property owners, residents, neighborhood groups, utility companies, and City departments. Regular engagement will be prioritized to maintain open dialogue and address issues early.
Proactive Communication Tools | We will coordinate closely with the City’s Public Works and Public Information Office to ensure all outreach materials align with City standards. Communication tools will include door -to-door outreach, flyer distribution, bilingual (English/Spanish) notifications, email updates, and website postings.
Advance Notice for Construction Impacts | Z&K will provide at least two weeks’ notice for impacts such as road closures, utility interruptions, pedestrian reroutes, and major milestones. All notifications will include project details, timelines, and contact information.
24/7 Public Information Access | A dedicated project hotline and email address will be provided for public inquiries. All messages will be logged and tracked in a Construction Impact Log, with timely responses.
Business Access & Custom Solutions | We will work closely with businesses to ma intain access during construction, provide directional signage, and coordinate temporary alternate routes as needed.
Construction Impact Tracking | A Construction Impact Log will be maintained to track concerns such as access, noise, dust, and scheduling. This tool will ensure issues are documented and addressed promptly.
Coordination with City Communications Team | Z&K will collaborate closely with the City’s Communications teams to ensure that all public messaging is accurate, timely, and consistent with City branding. We will review all outreach materials in advance, align project notices with City -approved formats, and share regular status updates with City communications staff to support transparency across all public-facing channels.
Project Completion Celebration | Z&K will support the City in planning a ribbon -cutting or similar event to celebrate project completion and community collaboration.
ADDITIONAL SERVICES AND VALUE
Z&K Consultants, Inc. understands the City of Anaheim’s goals for responsive, high-quality inspection services that support the timely and compliant delivery of capital improvement projects. Our team is fully prepared to provide comprehensive inspection support in alignment with the City’s expectations, including but not limited to:
Project Coordination and Meetings | Z&K’s inspection staff will actively participate in office, virtual, and on -site project meetings to remain aligned with the City, contractor, and all stakeholders. We will prepare and maintain WSWD and
attend construction progress meetings to document
milestones, identify schedule impacts, and support forward planning. Our team coordinates proactively with utility companies and third- party entities to avoid delays and ensure efficient execution. We also engage with residents and business owners to address inquiries and concerns with professionalism and courtesy. Z&K can provide inspectors for off-hours, night, or weekend support to maintain continuity of operations and public access.
Site Inspections and Documentation | Our inspectors will perform full-time, on-site inspection services throughout all project phases. This includes photographing the site pre -, during, and post -construction to document progress, site conditions, and compliance. We conduct daily inspections to verify grading, alignment, material quantities, and
conformance with plans and specifications. Safety and
maintenance reviews are part of our standard duties, and all field staff are trained to monitor pollutant discharge
prevention in accordance with NPDES regulations. Z&K
maintains a cult ure of jobsite safety and ensures strict adherence to contract provisions and safety protocols.
Reporting and Documentation Submittals | Z&K prepares
thorough daily inspection reports, including observations on labor, equipment, materials, and progress. All logs, reports, and photographic records are maintained electronically and posted to cloud -based systems such as SharePoint, in
accordance with City protocols. Weekly progress photo sets will be submitted digitally via flash drive or designated file sharing platforms. Our staff prepares testing summaries, acceptance memos, and final construction reports, as well as complete and accurate “As -Built” plans that reflect field changes, ensuring long-term asset management support for the City.
Compliance Checks and Inspector Qualifications | All
Z&K inspectors are experienced professionals with
certifications such as ICC, QSP, ACI, and OSHA 30, as
required for their specialty. Our team is qualified to inspect a range of systems and disciplines, including mechanic al, electrical, plumbing, structural, welding, and civil scopes.
Inspectors monitor workmanship and materials for
conformance to plans and specs, issue written correction notices for non- compliance, and perform follow -up checks.
Z&K staff also track contra ctor compliance with temporary traffic control requirements and proactively recommend
corrective measures for identified issues. Our team supports the City’s Quality Assurance Plan (QAP) and maintains a high standard for construction quality and documentation.
Submittals and Material Coordination | Z&K will assist with the review of shop drawings and submittals to ensure general compliance with contract requirements. We coordinate
closely with Anaheim Public Utilities, Public Works
Operations, and testing c onsultants for timely review and approval. Our team will schedule and oversee sampling and testing for materials such as concrete (slump and
compression), soil compaction, and asphalt. Where required, we will arrange and witness batch plant inspections to
confirm material integrity and adherence to specifications.
Punch List and Construction Progress | Our team will help establish the project punch list early and maintain it
throughout construction to prevent backlog and facilitate smoother project closeout. Z&K inspectors will update punch list items as work progresses and will perform follow -up inspections to confirm resolution and completeness. Prior to final acceptance, we will conduct a comprehensive
walkthrough and make recommendations to the City
regarding any outstanding work or acceptance conditions.
Final Acceptance and Testing Coordination | Z&K will
coordinate all activities leading up to project turnover, including scheduling of final inspections, testing
demonstrations, operations training, and City acceptance walkthroughs. Our staff ensures that closeout deliverables are submitted and confirmed prior to recommending formal acceptance. We serve as a liaison between the contractor and City to streamline the transition from active construction to operational use.
CWA Compliance | Z&K fully understands the requirements of the City’s Second Amended and Restated Community
Workforce Agreement (CWA). Our Building and Construction Inspectors fall under the covered classifications per
California Wage Determinations and are prepared to comply with all CWA provisions. This includes execution of the Letter of Assent, coordination with union representatives, and contribution to appropriate benefit trust funds. We ensure all “quality control” or “quality assurance” functions are
documented and performed in accordance with CWA
guidelines, and maintain internal records to support full compliance on all covered “Project Work.”
DESIRED KNOWLEDGE & EXPERIENCE | Z&K has deep experience providing inspection services on projects built to Greenbook and Caltrans standards, including roadway, bridge, stormwater, sewer, traffic signal, and park improvements.
Our team is skilled in interpreting design plans, verifying conformance to City and regulatory standards, and supporting both Design-Build and traditional delivery methods. We have worked on federally funded projects with third -party billing and understand the associated compliance and documentation requirements. We are adept at schedule review, change order evaluation, and issue resolution. Our ability to engage with the public, coordinate with multiple stakeholders, and deliver quality work within budget and schedule has made us a trusted municipal partner. We are fully familiar with the City of Anaheim’s Community Workforce Agreement (CWA) and its core workforce provisions.
C. PROJECT TEAM
C. PROJECT TEAM
Our organizational structure assigns distinct roles and responsibilities to key personnel, ensuring that each member contributes directly to the project’s success. The primary points of contact include our Principal in Charge/Account Manager, Contract Manager, Senior Construction Inspectors, and additional Support Personnel, who will remain dedicated to their assigned roles for the full contract duration. This commitment to stability ensures continuity, minimizes learning curves, and maintains consistent quality throughout the project. Resumes are included in Appendix A.
Z&K Consultants acknowledges the City’s requirement that key personnel identified in the Organizational Chart remain dedicated to their roles throughout the term of the Agreement. We understand that continuity is critical to maintaining project momentum and minimizing disruptions. We fully commit to ensuring that our proposed team remains available for the full contract term to deliver seamless project oversight and ensure consistent communication.
KEY PERSONNEL
Crystal Fraire, PE, QSD/P, Principal-in-Charge/Account Manager | Crystal Fraire, PE, QSD/P, will serve as the Principal -in-Charge and Account Manager for the City of Anaheim under this on -call Consulting Inspection Services contract. In this role, she will act as the single point of contact between Z&K Consultants and the City, and will be responsible for all aspects of ag reement administration, personnel coordination, and quality oversight. Crystal will oversee the assignment of lead and support personnel to projects, ensure all field staff meet required qualifications and certifications, and manage contract performance to align with City standards. She will coordinate with City representatives to address administrative requests, including billing, insurance, and schedule adjustments. Crystal will also review and approve personnel resumes, facilitate onboarding, and ensure staff availability aligns with project timelines and milestone needs. Her leadership ensures that each assignment is supported by qualified personnel and completed in accordance with contract provisions, regulatory requirements, and the City’s Quality Assurance Plan.
With extensive experience in municipal engineering and construction management, Crystal has successfully delivered a wide range of infrastructure projects, including roadway rehabilitation, storm drain and sewer upgrades, traffic signal systems, and public facility improvements. She is known for her responsive, collaborative approach and ability to resolve issues quickly and effectively in the field. Crystal is a licensed Professional Engineer and a certified Qualified SWPPP Developer and Practi tioner (QSD/P), with a deep understanding of federal and state regulatory compliance, including Caltrans LAPM, NPDES, and CWA provisions. Her technical expertise, paired with her leadership and operational oversight, ensures consistent performance across all assigned projects.
Brittany Duhn, PE, QSD/P, Contract Manager | Brittany Duhn, PE, QSD/P, will serve as the Contract Manager for this on-call inspection services contract with the City of Anaheim. In this role, Brittany will oversee day-to-day coordination of inspection task orders, manage documentation and reporting, and ensure that field staff are deployed in alignment with project needs and City expectations. She will support field personnel, review inspection deliverables, and work closely with City staff to maintain contract compliance. Brittany has significant experience providing inspection services on public works projec ts including roadway resurfacing, utility installations, ADA improvements, and park facility upgrades. She is highly proficient in field coordination, daily reporting, and stormwater compliance, and is trained in managing field issues in real time to keep projects moving efficiently.
Tom Dawson, CBO, ICC Cert., Senior Construction Inspector, Deputy/Specialty Inspector | Tom Dawson brings over 28 years of experience in public works and capital improvement projects, with deep expertise in construction inspection, project oversight, and contract administration. His background includes building construction, street and sidewalk improvements, traffic signal installations, and community park enhancements. Tom has overseen complex scopes involvi ng stormwater chamber systems, playground and lighting installations, concrete and electrical work, and landscaping. He also has specialized experience in landfill remediation, methane gas system rehabilitation, and contaminated soil removal, ensuring compliance with environmental regulations. He holds numerous ICC certifications including Building Plan Examiner, Commercial Combination Inspector, and Certified Building Official, and is OSHA 30-certified.
Jimmy Martin, ACI, ICC Cert., Senior Construction Inspector, Deputy/Specialty Inspector | Jimmy Martin brings over 27 years of hands-on experience in construction inspection, with a focus on roadway rehabilitation, street improvements, and public infrastructure upgrades. As a Senior Construc tion Inspector, Jimmy will be instrumental in ensuring project success through detailed daily field oversight, quality assurance, and consistent contractor coordination. His inspection responsibilities will include oversight of cold milling, asphalt removal and reconstruction, ARAM interlayer and ARHM overlays, curb and gutter replacement, ADA -compliant curb ramps, signing and striping, and traffic signal improvements. Jimmy is highly experienced in monitoring construction activities for conformance with contract documents, Caltrans standards, and City specifications. Jimmy’s role also encompasses contractor supervision, quality control tracking, safety compliance, and real-time problem-solving.
Ed Nylund, QSP, CWSSWI, Senior Construction Inspector, Traffic Signal/Electrical Inspector | Ed Nylund is a highly experienced Senior Construction Inspector with over 34 years of expertise in delivering quality assurance and inspection services on a wide range of public infrastructure projects. His areas of specialization include street improvements, storm drain systems, park and landscape enhancements, traffic signal installations, water and sewer utility upgrades, and municipal facilities construction. Ed has a strong foundation in grading, drainage, and encroachment permitting, and is known for ensuring projects are executed according to design specifications, safety standards, and jurisdictional requirements. During his 20+ year tenure as the Lead Public Inspector for the City of Chino, Ed was instrumental in managing critical public works projects, providing close coordination with contractors, City departments, and outside agencies to ensure seamless delivery.
Thomas “Tommy” Russell, Journeyman Electrician, Senior Construction Inspector , Traffic Signal/Electrical Inspector | Thomas "Tommy" Russell brings over 25 years of specialized experience in street rehabilitation, traffic signal modifications, and roadway infrast ructure projects. Tommy will provide expert oversight in managing electrical installations, traffic signal upgrades, and ITS system improvements. His extensive background in electrical work, coupled with his comprehensive knowledge of construction inspection and quality assurance, makes him uniquely suited to ensure the success of these projects. With a strong understanding of Caltrans Standard Specifications, Greenbook guidelines, and municipal construction requirements, he ensures that all construction activities adhere to industry best practices, safety protocols, and regulatory compliance. His proactive problem -solving, technical expertise, and leadership in the field will contribute to the successful execution of this project, ensuring the City receives high -quality infrastructure improvements completed on time and within budget.
Eddie Davalos, Senior Construction Inspector | Mr. Eddie Davalos brings over 25 years of extensive experience in public works inspection, construction management, and quality control for capital improvement projects. He has successfully delivered over 35 street improv ement projects, showcasing his expertise in managing diverse infrastructure enhancements. His skill set spans street and intersection improvements, median upgrades, ADA-compliant ramp installations, and the development of bike lanes and bike trails. Mr. Davalos is highly experienced in overseeing key technical aspects of construction, including conduit installations, traffic signal upgrades, asphalt overlays, and construction staging. His ability to manage traffic control measures ensures minimal disruption to surrounding communities while maintaining project safety. In addition, Mr. Davalos has extensive experience in site preparation activities such as clearing and grubbing, SWPPP preparation, and utility coordination.
TRANSITION PLAN FOR KEY PERSONNEL CHANGES
While Z&K is committed to maintaining our key personnel throughout the project term, we recognize that unforeseen circumstances may require changes. In the event that a key team member becomes unavailable due to circumstances beyond our control or if the City requests such a change, we have developed a structured Transition Plan to ensure minimal disruption to project activities. Our Transition Plan includes the following steps:
ü Immediate Notification: We will notify the City’s designated repres entative immediately upon identifying a necessary personnel change, ensuring transparency in the process. ü Candidate Identification: We will identify and propose qualified replacement personnel with equivalent or superior credentials, certifications, and relevant experience.
ü Knowledge Transfer: Our team will conduct detailed knowledge transfer sessions, ensuring all project background, progress details, and key deliverables are thoroughly communicated to the incoming personnel. ü City Approval: All replacement candidates will be presented to the City for approval before they assume responsibilities on the project.
ü Onboarding and Integration: The replacement team member will participate in site orientations, stakeholder introductions, and progress meetings to ensure they are fully integrated into the team with minimal impact on project timelines.
Z&K is proud to present a team of highly qualified professionals with deep expertise in construction inspection services.
Everyone has been thoughtfully selected to align with the specific scope and technical requirements of this on-call contract.
Our core team—referred to as our “A-Team”—is fully committed and available to perform the required services, ensuring seamless execution and consistent support for the City throughout the contract term.
STAFFING AND TASK MANAGEMENT APPROACH FOR THE INITIAL THREE-YEAR CONTRACT Z&K Consultants, Inc. has developed a flexible and scalable staffing model to support the City of Anaheim throughout the initial three-year duration of this on-call contract. Our approach ensures that we are well- positioned to respond quickly to task orders of varying size, scope, and complexity while maintaining the highest standards of quality, consistency, and accountability.
Our contract will be led by Crystal Fraire, PE, QSD/P, who will serve as the Principal-in-Charge and Account Manager. She will oversee all contractual obligations, resource deployment, quality assurance, and communication with City staff. Brittany Duhn, PE , QSD/P, will serve as the Contract Manager, managing day -to-day operations, coordinating inspection assignments, and tracking deliverables and performance metrics.
Z&K’s team of Senior Construction Inspectors—all of whom hold relevant certifications such as ICC, ACI, and QSP/QSD— will be deployed as needed based on task order requirements, technical discipline, and project timeline. Inspectors are assigned based on their subject matter expertise (e.g., traffic signal systems, underground utilities, ADA comp liance) and geographic proximity to the job site to enhance responsiveness and reduce mobilization time.
To ensure operational efficiency, Z&K utilizes cloud -based scheduling and documentation tools to track inspection coverage, monitor project progress, a nd manage resources in real -time. Our internal team holds weekly coordination meetings to review upcoming assignments, adjust staffing plans, and proactively address potential conflicts or resource constraints.
If multiple task orders are active concurrently, Z&K will deploy additional cross-trained inspectors from our broader network of qualified personnel to meet coverage demands without compromising quality or turnaround times. All personnel assigned to the City’s projects will be fully briefed on City procedures, documentation standards, and contract expectations through our standardized onboarding process.
This contract -ready structure— anchored by proven leadership, experienced inspectors, and operational flexibility— positions Z&K to consistently deliver responsive, high-quality inspection services for the duration of the agreement.
WORKLOAD MONITORING AND FLEXIBILITY | Z&K continuously monitors active and upcoming task orders through an internal resource tracking system. This allows us to identify potential resource needs in advance and proactively scale staffing levels by reassigning available personnel or activating backup inspectors from our prequalified internal roster. Our inspectors are cross-trained to handle a variety of disciplines, allowing for real -time shifts in deployment based on project need and inspector availability.
EMERGENCY AND SHORT-NOTICE TASK RESPONSE | For urgent or short -notice requests, Z&K maintains a ready bench of inspectors who can be mobilized quickly—often within 24 to 48 hours. We pre-load task order requirements into our mobile platform so that standby staff are briefed and prepared to report directly to job sites, minimizing administrative lag and ensuring uninterrupted field presence.
KEY PERSONNEL OVERVIEW
Z&K Consultants, Inc. is proud to present a dedicated team of professionals with the technical expertise, certifications, and municipal experience necessary to support the City of Anaheim under this on -call inspection services contract. Our team includes leadership personnel responsible for contract administration and resource coordination, along with a core group of senior construction inspectors, each selected for their deep field experience and familiarity with public works standards, including Greenbook, Caltrans, ADA, and stormwater compliance. This table provides an overview of each proposed team member, including their role, responsibilities, certifications, municipal experience, and level of involvement during the contract term.
Name Role Responsibilities Location Level of Effort Education & Credentials Crystal Fraire,
PE, QSD/P
Principal-in-
Charge / Account
Manager
Serves as primary City contact,
manages overall contract
execution, staffing, QA/QC, billing,
and personnel compliance.
Operates in a virtual
capacity to support
efficient contract
oversight
Principal oversight
throughout
contract;
moderate daily
involvement
BSCE‚ Cal Poly Pomona | PE
(CA), QSD, QSP, OSHA 30,
Defensive Driving
Brittany Duhn,
PE, QSD/P Contract Manager
Coordinates daily inspection task
orders, manages inspector
assignments, reviews deliverables,
and supports field operations.
Operates in a virtual
capacity to support
efficient contract
oversight
Primary daily
manager for all
task orders and
field staff
coordination
BSCE, Cal Poly Pomona | PE
(CA), QSD, QSP, OSHA 30
Thomas Dawson,
CBO, ICC Cert.
Senior
Construction
Inspector, Deputy
/ Special Inspector
Performs field inspections on
infrastructure and facilities,
ensures code compliance,
manages field documentation and
contractor coordination.
Deployed directly
from residence to
jobsite to maximize
efficiency.
Full-time on-site
inspector for
assigned projects
CBO, ICC Building Plan
Examiner, OSHA 30
Jimmy Martin,
ACI, ICC
Senior
Construction
Inspector, Deputy
/ Special Inspector
Conducts daily field inspections,
verifies compliance with specs,
manages reports and material
tracking, supports contractor and
utility coordination.
Deployed directly
from residence to
jobsite to maximize
efficiency.
Full-time on-site
inspector for
assigned projects
ICC Soils & Concrete, ACI Field
Tech Grade 1, OSHA 30
Ed Nylund, QSP,
CWSSWI
Senior
Construction
Inspector
Inspects traffic signal systems,
stormwater and landscaping
improvements, manages field
reports and construction
coordination.
Deployed directly
from residence to
jobsite to maximize
efficiency.
Full-time on-site
inspector with
traffic/utility focus
Multiple certificates, including
CSUS and USC courses | QSP,
Water Treatment & Distribution
Operator, Traffic Signal
Inspector Certs
Tommy Russell,
Journeyman
Electrician
Senior
Construction
Inspector (Traffic
Signal/Electrical)
Leads inspection of traffic signals,
ITS systems, fiber and electrical
upgrades, performs field QA/QC
and documentation.
Deployed directly
from residence to
jobsite to maximize
efficiency.
Full-time inspector
with traffic
signal/electrical
emphasis
Electrical Training
Apprenticeship, IBEW Local 441
| Journeyman Electrician, OSHA
30, Metro Rail Safety, Bridge
Inspection
Eddie Davalos
Senior
Construction
Inspector
Conducts inspections on sewer,
pavement, ADA ramps, and park
improvements; ensures labor
compliance and safety oversight.
Deployed directly
from residence to
jobsite to maximize
efficiency.
Full-time on-site
inspector across
street and park
improvement
projects
Public Works/Earth Work, Citrus
College | OSHA 30, Caltrans
Roadway Safety, Bridge
Inspector
D. RELEVANT EXPERIENCE
OF THE TEAM
D. RELEVANT EXPERIENCE OF THE TEAM
Z&K Consultants is proud to bring over 15 years of proven expertise in delivering comprehensive construction management and inspection services to municipalities and public agencies across Southern California. Our firm has a strong track record of guiding complex infrastructure projects through every phase —from initial planning and feasibility assessments to construction oversight and final closeout. We understand the unique challenges and priorities of public secto r work and consistently deliver projects that are completed on time, within budget, and in alignment with agency standards and community expectations. Through hands-on project delivery, proactive communication, and regulatory fluency, we ensure quality outcomes that meet the diverse needs of our clients. Our Team has experience with the following project features:
ü Roadway and Street Improvements
o Pavement rehabilitation and reconstruction
o ADA curb ramps and pedestrian facilities
o Sidewalk and crosswalk enhancements
o Traffic signalization and street lighting upgrades
ü Traffic Management and Safety Improvements
o Installation of signage and striping
o Implementation of traffic control measures per
MUTCD
o Temporary traffic handling and construction safety
plans
ü Public Utility Infrastructure
o Water mains and sewer line construction
o Reclaimed water pipeline projects
o Pump station upgrades and infrastructure
improvements
ü Stormwater and Drainage Infrastructure
o Storm drain system installations and replacements
o Drainage channels and flood control structures
o MS4 and NPDES compliance improvements
ü Sitework and Grading Projects
o Site grading and soil compaction
o Excavation and earthwork oversight
o Geotechnical coordination and inspection
ü Public Facility Enhancements
o Parks and community centers
o Landscaping and irrigation systems
o Electrical, HVAC, and mechanical system upgrades
ü Construction Administration & Management
o Bid support and constructability reviews
o Contract administration and documentation
o Daily inspection, reporting, and project tracking
FEATURED ON-CALL CONTRACTS
CITY OF MANHATTAN BEACH, ON- CALL PROJECT MANAGEMENT,
CONSTRUCTION MANAGEMENT, AND INSPECTION SERVICES | As part of an ongoing on- call contract, Z&K Consultants has been providing comprehensive project management, construction management and inspection services to support the City of Manhattan Beach’s Capital Improvement Program (CIP). Our work spans a wide range of public infrastructure projects, including roadway resurfacing, utility upgrades, storm drain enhancements, and public facility improvements. Z&K’s team has delivered construction oversight, daily inspection, and contractor coordination to ensure compliance with City specifications, safety standards, and applicable codes such as the Greenbook, California Building Code, and MUTCD. In addition to field services, Z&K has supported project documentation and reporting, including schedule tracking, budget monitoring, and submittal/RFI management. We have conducted constructability reviews, environmental compliance checks, and quality control inspections throughout the duration of each assignment. Our proactive coordination with City staff, design consultants, and contractors has allowed us to identify issues early, minimize construction delays, and maintain positive engagement with the public. Z&K’s responsive and knowledgeable staff has enabled the City to advance its CIP priorities efficiently while maintaining transparency and regulatory compliance. Key Projects include:
Transportation Projects
• Manhattan Beach Boulevard and Aviation Intersection
Improvements
• Cycle 2 Street Resurfacing and ADA Compliance
• Citywide Pavement Management Program
• Manhattan Village Parkway Streetscape Project
• Cycle 3 CDBG ADA Curb Ramp Project
Municipal Facility and Park Improvements
• Municipal Facility Improvements
• Marine Avenue Park Enhancements
Utility and Stormwater Projects
• Sepulveda Boulevard Storm Drain Rehabilitation
• Peck Reservoir Replacement Project
• Cycle 2 Water Infrastructure Improvement Project
• High Flow Capacity Trash Treatment Control Devices
Project
• Peck Avenue and Marine Avenue Stormwater
Improvement Project
Sustainability and Green Initiatives
• Manhattan Beach Green Infrastructure Initiative
CITY OF CORONA, ON -CALL PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES | Z&K Consultants is currently serving the City of Corona under an on -call contract to provide construction management, inspection, and engineering support services across a range of public infrastructure projects. Our work includes daily construction oversight, utility coordination, inspection of grading and drainage improvements, and quality assurance for municipal infrastructure such as roadway widening, traffic signal upgrades, and stormwater facilities. Z&K supports the City throughout all phases of project delivery, beginning with constructability reviews and design support, through active construction monitoring and final closeout. Our team provides detailed plan checks, value engineering recommendations, SWPPP and stormwater quality inspections, and enforcement of environmental and safety compliance.
We maintain strict adherence to applicable standards, including the Greenbook, California Building Code, MUTCD, and Caltrans specifications. Our success on this contract is driven by proactive coordination with City staff and contractors, regular reporting, and accurate budget tracking. We support transparent decision-making by providing timely updates and helping the City resolve construction challenges before they impact schedule or cost.
Transportation Projects
• Annual Pavement Rehabilitation
• Citywide Traffic Signal
Optimization Project
• Citywide Street Pavement
Rehabilitation Project
• Sherborne Street Improvements
• South Mall Parking Lot
Rehabilitation
• Corona Green Alleys
• Bedford Wash Bridge
Municipal Facility and Park
Improvements
• City Hall Veterans Memorial
Improvements Project
• Old PD Building Demolition
Project
• Victoria Park Splashpad
Water/Wastewater Projects
• Liberty Avenue Waterline
Replacement Project
• Lester WTP Backwash Tank
• Lester WTP Gravity Thickener
• Desalter Surge Anticipator
• Desalter WTP Sulfuric Acid Parts
• Replace Desalter Motorized
Operating Valves
• Centrifuge Project
• WRF 2 Secondary Clarifiers
• WRF 2 MCC Electrical Upgrades
• WRF 1 Clarifiers Rehab Project
• Emergency Bypass Booster
Pumps
CITY OF CHINO, ON -CALL PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES | Z&K Consultants is currently providing on-call project management, construction management, and inspection services to support the City of Chino’s public works program. Our team is actively involved in managing and inspecting infrastructure improvements across the city, including roadway resurfacing, right-of-way encroachments, stormwater system upgrades, and utility coordination. Services include plan review, constructability input, permitting support, construction oversight, and final closeout documentation. Z&K plays a key role in maintaining regulatory compliance by performing SWPPP inspections, stormwater quality monitoring, and ensuring adherence to environmental and safety standards. We are highly familiar with the Greenbook, Caltrans specifications, California Building Code, and the MUTCD, and apply these standards across all phases of project delivery. Our staff also supports grant administration, interagency coordination, and third-party utility engagement to help the City streamline implementation and minimize project delays. In addition to technical and field support, Z&K provides robust contract administration, schedule and budget tracking, and detailed reporting to help City staff make informed decisions.
Water Projects
• WA17B - Chino Quad 1.2
• WA211 - Well 11 Pipeline Project
• WA212 - State Street Water Treatment Plant
• WA213 - Benson Reservoir and Site Improvements
• WA214 - Well 17 Equipping Project
• WA221 & WA222 - Central Ave and Dupont Ave Waterline
Project
• WA223 - Russell Ave Waterline Replacement Project
• WA224 - B Street Alley Water Main Line Replacement
• WA231 - Wells 4 & 6 Water Treatment Facility
Slurry Seal and Repairs
• MS222 - Slurry Seal Program
• NC231 - Schaefer Ave Localized Asphalt Repairs
Street Improvement Projects
• ST061 - Pine Avenue Extension
• ST162 Localized Asphalt Repairs Various Locations
• ST203 - Pine Avenue Widening & Pine/Euclid Intersection • SN211 – Alley Sanitation Rehab 20-21
• SN221 - FY21/22 Alley Reconstruction Project
• ST222 - Kimball/El Prado/Central Traffic Improvement
• ST223 – Madison St & Kellogg Ave Gap Closure
• SN231 - Alley Rehabilitation Project - Pioneer St
• ST232 – Kimball Ave Street Improvement
• ST233 - Yorba Ave Improvements
• ST241 - Ramp Improvements
• R2401 - Euclid Bridge
• G6220 - CDBG Alley Project, East-West North Chino
ADA and Accessibility Projects
• MS202 – ADA Grievance 21- 004 Curb Ramps at Olive
Place & Walnut Ave
• MS202 & ST221 - Chino Avenue Accessibility and Curb
Ramp Improvements at 15th, 17th, and 19th Streets and
Norton Avenue PCC Walk and Curb Ramps
• 11th Street Pavement Reconstruction Alley Accessibility and Intersection Accessibility Project
Storm Drain Projects
• SD223 - Chino Avenue Storm Drain Improvement
• SD222 - Philadelphia Street and Monte Vista Avenue
Storm Drain Extension Project
• SD211 -
11th Street/B Street Project
• Philadelphia St. & Monte Vista Ave Storm Drain Extension Project
CITY OF CARSON, ON-CALL PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES | Z&K is currently providing On-Call Project Management and Construction Management/Inspection Services for the City of Carson, actively supporting the delivery of a variety of Capital Improvement Projects (CIPs) designed to advance community revitalization, infrastructure enhancement, and sustainable growth. Our comprehensive project approach emphasizes proactive collaboration with City staff, transparent communication with stakeholders, and technical expertise tailored specifically to municipal project requirements. By leveraging advanced tools and software platforms such as Procore for document management, Primavera P6 for detailed schedule tracking, and GIS mapping for precise spatial analysis, we ensure accurate, real-time tracking of project progress, diligent budget oversight, and consistent adherence to all regulatory compliance requirements. Through this robust and technology-driven management approach, Z&K effectively streamlines the successful delivery of complex, multi-phase projects while maintaining alignment with the City's goals.
Civic Projects
• Civic Center Specific Plan
• City Hall Basement Renovation
Transportation and Streetscape
• Pavement Rehab Projects
• Traffic Signal and Intersection
Improvement Projects
Environmental and Stormwater
• Urban Forestry Master Plan
• Storm Drain Improvement
Initiatives
Parks and Recreation
• Park and Recreation
Enhancement
CITY OF LONG BEACH, ON-CALL PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES | Z&K Consultants, Inc. is proud to support the Long Beach Utilities Department with a comprehensive suite of engineering and management services tailored to critical infrastructure and public utility projects. Our professional municipal engineering services encompass detailed project management, construction management and inspection, document control, and specialized technical support, ensuring that each phase of every project —from initial design coordination through final completion—is executed efficiently, transparently, and within budget. We emphasize strict adherence to local, state, and federal regulations, including compliance with environmental standards, permitting processes, and safety protocols. By applying rigorous quality assurance procedures, proactive stakeholder engagement, and innovative project management tools, Z&K consistently delivers projects that enhance the reliability, sustainability, and resilience of the City's vital utility infrastructure.
Water Projects
• West Coast Basin Well Equipment
• NLB-13 & NLB-14 Equipping
• GWTP-1 and GWTP-2 Wells
• Golden Ave Water Main
• LADWP Haynes Generating Station Water & Sewer
Pipeline
• Wells - Alamitos 9A & 14
Sewer Projects
• S- 8 Sewer Lift Station Rehab
• S- 25 Sewer Lift Station Rehab
Facility and Building Projects
• Groundwater Treatment Plant HVAC Replacement
Project
• EO-3585: LBWD Admin Bldg Roof Improvements
CITY OF SAN BERNARDINO, ON- CALL SERVICES | Z&K Consultants has been a trusted provider of comprehensive project management, construction management, and construction inspection services for the City of San Bernardino. Our dedicated team supports the entire project lifecycle, from initial inception through planning, design review, bidding, construction oversight, and project closeout. We closely collaborate with City staff, contractors, and community stakeholders to proactively address challenges, streamline communication, and ensure adherence to tim elines, budgets, and quality standards. This integrated and collaborative approach helps the City effectively achieve its infrastructure improvement goals while maintaining transparency and accountability throughout the process.
CITY OF NORCO, ON-CALL SERVICES | Z&K Consultants, Inc. has successfully supported the City of Norco by providing comprehensive inspection services and detailed oversight to uphold high -quality standards and regulatory compliance throughout all phases of public infrastructure constr uction projects. Our experienced team offers meticulous supervision and proactive coordination across diverse project types, including roadway rehabilitation, drainage system enhancements, utility installations, and other municipal improvement initiatives. We closely collaborate with City personnel, contractors, and regulatory agencies to ensure construction activities consistently align with approved plans and specifications, established safety protocols, environmental standards, and relevant regulatory requirements.
CITY OF HEMET , ON -CALL SERVICES |
Z&K Consultants, Inc. has provided on -call construction inspection and management services to the City of Hemet, supporting a wide range of public works and infrastructure improvement projects. Our responsibil ities have included inspection of sewer main replacements, pavement rehabilitation, ADA accessibility upgrades, and utility coordination. Z&K’s inspectors work closely with City staff, contractors, and engineering teams to monitor construction activities, document progress, and ensure that work is performed in accordance with project specifications, safety regulations, and environmental requirements. Our proactive field presence and commitment to communication help maintain schedule integrity, minimize disruption to the community, and deliver projects that meet the City’s high standards for quality and compliance.
PROJECT SPECIFIC EXPERIENCE
In addition to our extensive on-call experience, we have included a selection of representative project summaries below to highlight our team’s capabilities across a range of infrastructure types and agency clients.
TRANSPORTATION, STREET IMPROVEMENT & TRAFFIC SIGNAL PROJECTS • City of Alhambra - FY 19- 20, 20- 21, and 21- 22 Street Rehabilitation Projects & Pedestrian Countdown Signal
Head Installation Project
• City of Cathedral City - HSIP Cycle 9A Traffic Signal Project
• City of Compton – Annual Residential Street Rehab
Project, Phases 1 & 2A
• City of Costa Mesa – Citywide Parkway Mai ntenance,
Street Rehab, and Slurry Seal
• City of Downey – Woodruff Avenue Pavement
Rehabilitation Project
• City of Eastvale - 2024 Median Project
• City of El Segundo – El Segundo Boulevard Project
• City of Fontana - Sierra Avenue Landscape Median
Project
• City of Glendale - Glendale Arts and Entertainment District Improvements on Artsakh Avenue Project
• City of Irwindale – 2021-2022 Resurfacing
• City of Laguna Beach – Zones 5 & 11A Street Slurry Seal • City of Lake Forest - Various LFTM Projects and Arterial Median Improvement Project; Slurry Seal Zones A, D
(Phase 1), D (Phase 2), E, and B; Street Resurfacing of Glenn Ranch Road from Portola to El Toro, Slurry Seal
Zone F, and Arterial Slurry Seal Jeronimo and Muirlands from Los Alisos to Bake; Arbor Park Access Ramp
Project; Bake Parkway Resurfacing (South Pointe Drive
to Rancho Parkway South Phase 1 and 2)
• City of Moreno Valley – Citywide Pavement Rehabilitation • City of Norwalk – CDBG Local Streets Rehabilitation
• City of Palm Springs – HSIP Cycle 9 Traffic Signal
Modifications at Nine Intersections Project
• City of Pomona - Police Parking Lot Renovations
• City of Rancho Cucamonga - Heritage Park Bridge Project • City of San Marino – Street Rehabilitation Project
• City of Torrance – Anza/Vista Montana/PCH Traffic Signal & Residential/Arterial Pavement
PARKS & RECREATION PROJECTS
• City of Costa Mesa – Jack Hammet Sports Complex
Improvement Project
• City of Garden Grove – Woodbury Park Revitalization and Expansion Project
• City of Irwindale – Irwindale Park Improvements Project • City of La Habra – Vista Grande Park Improvements
• City of Lake Forest - Arbor Mini Parks Project;
Neighborhood Park Renovations – Borrego Overlook,
Regency, Rancho Serrano, Sundowner and Vintage
Parks
• City of La Quinta – SilverRock Park Venue Site
• City of Newport Beach – San Miguel Park Improvement
Project
• City of South Gate – Hollydale Community Park
Renovation Project & Circle Park Improvement Project
• City of Tustin – Veterans Sports Park at Tustin Legacy; Armstrong Pedestrian Bridge; Legacy Park Phase 3; and
N-D South Phase 2 Package 2
• DRD - Thermal Park Improvement Project
PUBLIC FACILITIES PROJECTS
• City of Carson – City Hall Basement Renovation
• City of Fontana – Fire Station #81 Project
• City of Irvine – James Musick Facility Project
• City of La Habra – Vista Grande Park Restroom
Improvements Project
• City of La Mirada - City Hall Fountain Renovation Project • City of Lynwood – Yvonne Burke John Ham Park
Community Center Project
• City of Ontario – Fire Station #5 & Fire Station Training Facility Project
• City of Orange – Betty Lamoreaux Justice Center
• City of Rancho Palos Verdes – Hesse Park Roof
Replacement Project
• City of Santa Ana – Main Jail Structure for Sheriff's Department Project
• City of Signal Hill – City Hall Interior Renovation
• County of Los Angeles – Juvenile Hall Detention Facility
UTILITY (WATER, WASTEWATER, STORM DRAIN) PROJECTS
• City of Fullerton – Longview Drive Water/Sewer Main
Replacement & Street Improvements
• City of Fullerton – Valencia Avenue Water Main
• City of Hemet – Sewer Mainline Replacement
• City of La Habra - Coyote Creek and Imperia l
Channel
Repair Project
• City of Lake Forest - Arbor Access Ramp Sewer Lateral • City of Norwalk – Water Main Installation Project
• City of Oceanside – Pilgrim Creek Sewer Lift Station
Improvement Project
• City of Oceanside – San Luis Rev (SLR) WWTP Aeration
Basin Effluent Piping Replacement
• City of Pico Rivera – Water Main Replacement Project
• City of San Marino – Lift Station Improvement Program • City of Torrance – Van Ness Water Wells Transmission
• Elsinore Valley Municipal Water District (EVMWD) –
Highway 74 Waterline Relocation
• City of Riverside - Magnolia Interconnect Project; Garfield Overland Phase 3; Gage 29 -2R Equipping; Lincoln
Avenue Techite Pipe Replacement Project Phase I
(Jefferson St. to Madison St.)
CURRENT ON-CALL CONTRACTS
Z&K currently holds over 58 active on-call contracts, demonstrating our ability to deliver flexible, high-quality services across municipal infrastructure, transportation, utilities, and facility upgrades. This extensive experience has given us a strong understanding of agency needs, allowing us to provide efficient, cost-effective solutions tailored to project demands. # Agency PM CM CI # Agency PM CM CI
1 City of Alhambra ✓ ✓ ✓ 30 City of Ontario ✓
2 City of Beaumont ✓ 31 City of Palm Desert ✓ ✓
3 City of Bell ✓ ✓ ✓ 32 City of Pico Rivera ✓ ✓
4 City of Burbank ✓ ✓ ✓ 33 City of Placentia ✓ ✓
5 City of Carson ✓ ✓ ✓ 34 City of Pomona ✓ ✓ ✓
6 City of Chino ✓ ✓ ✓ 35 City of Rancho Palos Verdes ✓ 7 City of Corona ✓ ✓ ✓ 36 City of Rosemead ✓ ✓
8 City of Costa Mesa ✓ ✓ ✓ 37 City of San Bernardino ✓ ✓ ✓ 9 City of Downey ✓ ✓ ✓ 38 City of San Marino ✓ ✓ ✓
10 City of Eastvale ✓ ✓ ✓ 39 City of Santa Monica ✓
11 City of El Segundo ✓ ✓ ✓ 40 City of Signal Hill ✓ ✓ 12 City of Encinitas ✓ ✓ ✓ 41 City of South Gate ✓ ✓ ✓ 13 City of Fontana ✓ ✓ ✓ 42 City of Temecula ✓
14 City of Glendale ✓ ✓ ✓ 43 City of Torrance ✓ ✓ ✓
15 City of Hemet ✓ ✓ ✓ 44 City of Whittier ✓ ✓
16 City of Irvine ✓ ✓ ✓ 45 Caltrans 59 - District 5* ✓ ✓ 17 City of Irwindale ✓ ✓ ✓ 46 Caltrans 59 - District 8* ✓ ✓ 18 City of La Habra ✓ ✓ ✓ 47 Caltrans 59 - District 9* ✓ ✓ 19 City of La Mirada ✓ ✓ 48 Coachella Valley Water District ✓ ✓ ✓ 20 City of Laguna Beach ✓ ✓ ✓ 49 County of Los Angeles* ✓ ✓ 21 City of Lake Forest ✓ ✓ ✓ 50 County of San Diego* ✓ ✓ 22 City of Lancaster ✓ ✓ 51 LA Metro* ✓ ✓
23 City of Malibu ✓ ✓ 52 Long Beach Utilities ✓ ✓
24 City of Manhattan Beach ✓ ✓ ✓ 53 RCTC* ✓ ✓
25 City of Moreno Valley ✓ ✓ 54 RCTD* ✓
26 City of Newport Beach ✓ ✓ 55 Riverside Public Utilities ✓ ✓ 27 City of Norco ✓ ✓ 56 San Bernardino County* ✓
28 City of Norwalk ✓ ✓ ✓ 57 Santa Clarita Valley Water Agency* ✓ 29 City of Oceanside ✓ ✓ ✓ 58 South Orange County Wastewater Authority ✓ ✓ ✓ PM: Project Management, CM: Construction Management, and CI: Construction Inspection, * Contract as a Subconsultant Contract Duration and Stability: Z&K’s active on- call contracts reflect long -standing and continuing partnerships, with several contracts i n place for multiple consecutive terms. Many of our client relationships extend beyond five years, underscoring our reliability and the high satisfaction rate among our municipal and public-sector clients.
Geographic Coverage and Responsiveness: Our contra cts span a broad geographic area, including Los Angeles, Riverside, Orange, San Bernardino, and San Diego counties, demonstrating our capability to mobilize quickly and effectively respond to a diverse range of project requirements. Our strategically locat ed teams ensure responsiveness and efficient service delivery to meet each agency’s unique demands.
Diverse Project Scales and Complexities: Z&K successfully manages on-call contracts ranging significantly in scope and scale, from smaller task-based projects to large, complex capital improvement programs. We have handled individual task orders ranging from $50,000 to multimillion -dollar, multi-phase infrastructure improvements, reflecting our adaptability to various project sizes and complexities.
E. FEE SCHEDULE
F. LITIGATION
G. REFERENCES
E. FEE SCHEDULE
Separate Submission.
F. LITIGATION
Z&K Consultants, Inc. (Z&K) affirms that it has had no litigation, past or pending, resulting from professional services rendered since the company’s inception in 2009. There are no current claims, lawsuits, or arbitrations involving Z&K, and no court decisions or arbitration rulings have been rendered against the firm in relation to its professional services.
G. CLIENT REFERENCES
Our team has developed a strong reputation for delivering resp onsive, high-quality services that meet or exceed agency expectations. Should you require any additional project information, supplemental contact details, or clarification regarding our roles, scope, or performance on any referenced projects, Z&K Consultants would be pleased to provide it. We are also happy to arrange direct communication with agency staff, provide sample deliverables, or offer expanded project summaries to support your evaluation. Our goal is to ensure complete transparency and de monstrate our readiness to serve as a trusted extension of the City’s team.
City of Manhattan Beach
Contact Name: Gilbert Ramos, Associate Engineer
Address: 3621 Bell Avenue, Manhattan Beach, CA 90266
Phone & Email: (310) 802-5362, [email protected] Contract Amount: $1,200,000
Contract Term Dates: January 2022 – December 2026 (Ongoing) Services: On-Call Project Management, Construction Management, and Inspection City of Corona
Contact Name: Aftab Hussain, Assistant Utilities Director Address: 400 S Vicentia Ave, Corona, CA 92882
Phone & Email: (909) 202-5981, [email protected] Contract Amount: $750,000
Contract Term Dates: January 2022 – June 2027 (Ongoing) Services: On-Call Project Management, Construction Management, and Inspection City of Chino
Contact Name: Michele Hindersinn, Principal Engineer
Address: 13220 Central Ave, Chino, CA 91710
Phone & Email: (909) 334-3213, [email protected] Contract Amount: $1,100,000
Contract Term Dates: April 2021 – July 2028 (Ongoing)
Services: On-Call Project Management, Construction Management, and Inspection City of Carson
Contact Name: Dr. Arlington Rodgers, Director of Public Works Address: 18620 South Broadway Street, Carson, CA 90248 Phone & Email: (310) 857-3500, [email protected]
Contract Amount: $1,100,000
Contract Term Dates: January 2024 – June 2028 (Ongoing) Services: On-Call Project Management, Construction Management, and Inspection City of Long Beach
Contact Name: Dennis Santos, Manager of Engineering
Address: 1800 E Wardlow Rd, Long Beach, CA 90807
Phone & Email: (562) 570-2381, [email protected] Contract Amount: $3,200,000
Contract Term Dates: October 2021 – October 2025 (Ongoing) Services: On-Call Project Management, Construction Management, and Inspection Additional references available upon request.
APPENDIX A. RESUMES
Crystal Fraire, PE, QSD/P, will serve as the Principal -in-Charge and Account Manager for the City of Anaheim under this on -call Consulting Inspection Services contract. In this role, she will act as the single point of contact between Z&K Consultants and the City, and will be responsible for all aspects of agreement administration, personnel coordination, and quality oversight.
Crystal will oversee the assignment of lead and support personnel to projects, ensure all field staff meet required qualifications and certifications, and manage contract performance to align with City standards. She will coordinate with City representatives to address administrative requests, including billing, insurance, and schedule adjustments. Crystal will also review and approve personnel resumes, facilitate onboarding, and ensure staff availability aligns with project timelines and milestone needs. Her leadership ensures that each assignment is supported by qualified personnel and completed in accordance with contract provisions, regulatory requirements, and the City’s Quality Assurance Plan.
With extensive experience in municipal engineering and construction management, Crystal has successfully delivered a wide range of infrastructure projects, including roadway rehabilitation, storm drain and sewer upgrades, traffic signal systems, and public facility improvements. She is known for her responsive, collaborative approach and ability to resolve issues quickly and effectively in the field. Crystal is a licensed Professional Engineer and a certified Qualified SWPPP Develo per and Practitioner (QSD/P), with a deep understanding of federal and state regulatory compliance, including Caltrans LAPM, NPDES, and CWA provisions. Her technical expertise, paired with her leadership and operational oversight, ensures consistent performance across all assigned projects.
ACCOUNT MANAGEMENT EXPERIENCE
Crystal Fraire, PE, QSD/P, has served as the Account Manager and Principal-in-Charge for numerous contracts spanning on-call construction management, project management, and inspection services, as well as project-specific engagements across Southern California. In each role, she has overseen staff assignments, maintained quality control, managed client communication, and ensured that work was completed in accordance with contract terms and a gency standards. The following is a list of agencies and organizations where Crystal has provided leadership and oversight as the designated Account Manager:
ü City of Alhambra
ü City of Beaumont
ü City of Bell
ü City of Burbank
ü City of Carson
ü City of Chino
ü City of Corona
ü City of Costa Mesa
ü City of Downey
ü City of Eastvale
ü City of El Segundo
ü City of Encinitas
ü City of Fontana
ü City of Glendale
ü City of Hemet
ü City of Irvine
ü City of Irwindale
ü City of La Habra
ü City of La Mirada
ü City of Laguna Beach
ü City of Lake Forest
ü City of Lancaster
ü City of Malibu
ü City of Manhattan Beach
ü City of Moreno Valley
ü City of Newport Beach
ü City of Norco
ü City of Norwalk
ü City of Oceanside
ü City of Ontario
ü City of Palm Desert
ü City of Pico Rivera
ü City of Placentia
ü City of Pomona
ü City of Rancho Palos Verdes
ü City of Rosemead
ü City of San Bernardino
ü City of San Marino
ü City of Santa Monica
ü City of Signal Hill
ü City of South Gate
ü City of Temecula
ü City of Torrance
ü City of Whittier
ü Caltrans 59 - District 5
ü Caltrans 59 - District 8
ü Caltrans 59 - District 9
ü Coachella Valley Water District
ü County of Los Angeles
ü County of San Diego
ü LA Metro
ü Long Beach Utilities
ü RCTC
ü RCTD
ü Riverside Public Utilities
ü San Bernardino County
ü Santa Clarita Valley Water Agency
ü South Orange County Wastewater
Authority
EDUCATION
» BSCE – Civil Engineering
California State Polytechnic
University, Pomona
LICENSES & REGISTRATION
» Professional Engineer, P.E.
State of California, #91674
» SWPPP (QSD) & (QSP)
Certificate #27614
» 30-Hr. Cal OSHA
» Defensive Driving Training
Crystal Fraire, PE, QSD/QSP
Principal-in-Charge / Account Manager
Brittany Duhn, PE, QSD/P, will serve as the Contract Manager for this on -call inspection services contract with the City of Anaheim . In this role, Brittany will oversee day -to-day coordination of inspection task orders, manage documentation and reporting, and ensure that field staff are deployed in alignment with project needs and City expectations. She will support field personnel, review inspection deliverables, and work closely with City staff to maintain contract compliance.
Brittany has significant experience providing inspection services on public works projects including roadway resurfacing, utility installations, ADA improvements, and park facility upgrades. She is highly proficient in field coordination, daily reporting, and stormwater compliance, and is trained in managing field issues in real time to keep projects moving efficiently.
As a licensed Professional Engin eer and Qualified SWPPP Developer / Practitioner, Brittany brings strong technical knowledge and a detail- oriented approach to contract execution. While Crystal Fraire, PE will serve as the Principal-in-Charge and primary point of contact for the City, Brittany will provide the day-to-day contract oversight necessary to support consistent, high -quality delivery of inspection services.
PROJECT EXPERIENCE | Brittany Duhn, PE, QSD/P, has served as the Contract Manager for several municipal On -Call Project Management, Construction Management and Inspection Services contracts. In this role, she is responsible for overseeing all assigned task orders, managing staff deployment, ensuring quality control, coordinating with City staff and contractors, and maintaining compliance with funding and regulatory requirements (including Caltrans LAPM and FHWA standards). She currently or previously served as the Contract/Project Manager for the following on- call contracts:
CITY OF BEAUMONT | Oversaw on -call construction support for utility and street improvement projects, ensuring documentation accuracy and coordination with City engineering staff.
CITY OF CARSON | Led task orders including facility renovations, park improvements, and stormwater upgrades, managing documentation, coordination, and field oversight through tools like Procore and P6.
CITY OF CHINO | Managed a variety of task orders including pipeline installation, storm drain upgrades, ADA curb ramps, and street widening—ensuring compliance with City and regulatory standards.
CITY OF CORONA | Directed construction management efforts for waterline replacements, bridge improvements, and green alley infrastructure—ensuring regulatory compliance and quality assurance.
CITY OF EL SEGUNDO | Served as PM for on -call permit inspection and capital project support, including traffic improvements and grant compliance documentation.
CITY OF HEMET | Served as PM on utility and sewer main replacements, overseeing construc tion documentation and ensuring smooth coordination across public works teams.
CITY OF LAKE FOREST |Oversaw park renovations, slurry seal, and accessibility upgrades—ensuring quality construction and coordination with City staff and the public.
CITY OF LONG BEACH | Managed construction support for water, sewer, and recycled water pipeline projects, including coordination with LADWP and utility agencies.
CITY OF MANHATTAN BEACH | Oversaw on -call projects such as Cycle 2 Street Improvements and streetscape enhancements, providing construction oversight and ensuring adherence to schedules and accessibility goals.
CITY OF NORCO | Managed inspections for water, sewer, and storm drain improvement projects —coordinating closely with field staff to maintain compliance and progress.
CITY OF SAN BERNARDINO | Provided construction support across multiple capital improvement projects, including Safe Routes to School, street rehab, and splash pad installations.
EDUCATION
» BSCE – Civil Engineering
California State Polytechnic
University, Pomona
LICENSES & REGISTRATION
» Professional Engineer,
P.E. State of California, #91078
» SWPPP (QSD) & (QSP)
Certificate # 22055
» OSHA 30 Hour
Brittany Duhn, PE, QSD/QSP
Contract Manager
Tom Dawson brings over 28 years of experience in publ ic works and capital improvement projects, with deep expertise in construction inspection, project oversight, and contract administration. His background includes building construction, street and sidewalk improvements, traffic signal installations, and community park enhancements. Tom has overseen complex scopes involving stormwater chamber systems, playground and lighting installations, concrete and electrical work, and landscaping. He also has specialized experience in landfill remediation, methane gas s ystem rehabilitation, and contaminated soil removal, ensuring compliance with environmental regulations.
He holds numerous ICC certifications including Building Plan Examiner, Commercial Combination Inspector, and Certified Building Official, and is OSHA 30-certified. Tom has worked extensively on projects within Caltrans right-of-way (ROW), with a strong command of Greenbook standards, Caltrans specifications, and ADA compliance. A former Deputy Building Official for the County of Orange for over 12 years, Tom brings exceptional technical and regulatory expertise. His proactive approach and attention to detail ensure high-quality project delivery, safety, and schedule integrity.
PROJECT EXPERIENCE | Tom has served as the Senior Construction Inspector on a wide range of public infrastructure projects that share key features with the City’s upcoming projects. Tom’s consistent field presence, detailed documentation, and collaborative approach ensure quality, safety, and compliance across all phases of construction. Tom was the Lead Construction Inspector on the following projects:
TRANSPORTATION, STREET IMPROVEMENT & TRAFFIC SIGNAL
PROJECTS
CITY OF EL SEGUNDO , EL SEGUNDO BOULEVARD IMPROVEMENT
PROJECT, PW 23-02 | The El Segundo Boulevard Improvement Project in the City of El Segundo enhances roadway conditions, traffic flow, and safety along key corridors. The project involves pavement rehabilitation on El Segundo Boulevard (Illinois Street to Isis Avenue) and Nash Street (El Segundo Boulevard to Imperial Highway) using a cement-stabilized base with an asphalt overlay, requiring traffic detours. Key improvements include new traffic signals, ADA-compliant curb ramps at multiple intersections, and upgraded bicycle infrastructure with 1,020 linear feet of cycle track, 27,450 linear feet of Class II bike lanes, and Class III bike route markings (Sharrows). These upgrades improve mobility, enhance safety, and create a more accessible transportation network for all road users.
CITY OF COMPTON , ANNUAL RESIDENTIAL STREET REHAB PROJECT, PHASES 1 & 2A | The Project includes extensive roadway and infrastructure upgrades such as asphalt overlay, concrete improvements, ADA-compliant pedestrian enhancements, and traffic control measures. The project also involves utility adjustments, landscaping, and pavement rehabilitation with features like slurry seal, aggregate base, and full-depth AC slot pavement, ensuring improved functionality and accessibility.
CITY OF ALHAMBRA, FY 19-20, 20-21, AND 21 -22 STREET RE HABILITATION PROJECTS |The City of Alhambra’s multi-year Street Rehabilitation Projects aimed to enhance roadway infrastructure across various local street segments over three fiscal years. These projects involved comprehensive pavement rehabilitation and concrete improvements for a total of 68 local street segments. Each project was designed to improve accessibility, enhance pavement conditions, and ensure compliance with ADA standards. The scope of work included pavement resurfacing, application of slurry seal treatments, varying depths of cold milling and asphalt overlay, and full- depth pavement removal and reconstruction. Concrete improvements involved the removal and replacement of broken and off-grade sidewalks, curb and gutter repairs, ADA curb ramp u pgrades, and the reconstruction of concrete cross gutters and driveway aprons. Additional elements included construction staging, installation of loop detectors, adjustment of manhole and utility covers to grade, and the installation of PCC sidewalks.
CITY OF ROSEMEAD, WALNUT GROVE AVE. RESURFACING PROJECT PHASE I | This project involved street resurfacing and widening of Walnut Grove Ave., from Marshall St. to Grand Ave. in the City of Rosemead. Improvements included roadway widening, intersection improvement, waterline installation, pavement improvements, ADA improvements, sidewalk repairs, traffic signal modification, storm drain improvements, sewer main improvements, and bike lanes.
Thomas Dawson, CBO, ICC Certified
Senior Construction Inspector, Deputy/Special Inspector
LICENSES & REGISTRATION
» International Code
Counsel Certifications
» Building Plan Examiner
» California Commercial
Combination Inspector
» California Commercial
Plumbing Inspector
» California Commercial
Mechanical Inspector
» California Residential
Mechanical Inspector
» California Residential
Electrical Inspector
» California Residential
Plumbing Inspector
» Certified Building Official
» CLB License No. 674861
» OSHA 30 Hr. Training
PUBLIC FACILITIES PROJECTS
CITY OF LYNWOOD, YVONNE BURKE – JOHN HAM PARK COMMUNITY CENTER PROJECT | This project includes improvements to the Yvonne Burke – John Ham Park Community Center, with upgrades such as a kitchen, multipurpose rooms, administration offices, restrooms, and a game room. Park enhancements feature landscaping, irrigation, outdoor exercise stations, a natural grass baseball field, and covered picnic and barbecue areas. The site incorporates a dual - plumbed system and reclaimed water for irrigation, supporting sustainability and improved recreational facilities.
CITY OF IRVINE, JAMES MUSICK FACILITY PROJECT | Historically known as "the Farm," the James Musick Facility underwent a significant expansion, adding 896 beds to support Orange County’s growing jail population. This project aligns with modern correctional practices by incorporating direct -supervision housing, medical facilities, and rehabilitative programming spaces, reflecting a focus on humane and effective incarceration methods.
CITY OF ONTARIO, FIRE STATION TRAINING FACILITY PROJECT | The new fire and police training center in Ontario is a 4.5-acre complex adjacent to Fire Station 3. It features two training towers and a burn building, along with administrative offices, classrooms, and confined- space props for training. Th is facility supports advanced training capabilities for first responders and was awarded a Training Facilities Gold Award in Firehouse's Station Design Awards.
PARKS & RECREATION PROJECTS
CITY OF TUSTIN, VETERANS SPORTS PARK AT TUSTIN LEGACY | The Veterans Sports Park at Tustin Legacy is a state-of-the-art recreational facility designed to serve the growing community. The project included the development of various sports and recreational amenities aimed at promoting active lifestyles, community engagement, and honoring local veterans. The park features multiple sports fields, including soccer and baseball fields, as well as basketball and tennis courts. There are also designated areas for fitness activities, such as an outdoor fitness zone with exercise equipment, and a large playground area equipped with modern play structures for children of all ages. In addition to the sports and recreational facilities, the park offers a Veterans Memorial Plaza, which serves as a tribute to military veterans, providing a space for reflection and community events. The project also included extensive landscaping, walking and biking trails, picnic areas with shade structures, and new parking facilities to accommodate visitors. Designed to be a multi-use destination, the Veterans Sports Park at Tustin Legacy provides a blend of athletic, social, and commemorative spaces for residents to enjoy year-round.
CITY OF LA HABRA, VISTA GRANDE PARK IMPROVEMENTS PROJECT | The Vista Grande Park Improvements project involved a comprehensive revitalization of the park facilities on a closed municipal landfill. The project included extensive earthwork, installation of asphalt concrete (AC) pavement, and concrete hardscape. New Park amenities that were added included a modular restroom and storage building, a concrete basketball court, and an operations deck for composting.
Additional features installed during the renovation included exercise stations, benches, picnic tables, a gazebo, and shade structures. Walking and running trails were developed, complemented by softscape elements like a children’s play area, volleyball court, dog park, and turf. Below-grade utilities were also installed as part of the upgrade. Significant modifications to the landfill gas system and par k irrigation, along with safety improvements such as solar -powered LED lighting and security gates, were key aspects of the project.
UTILITY PROJECTS (WATER, WASTEWATER, STORM DRAIN)
CITY OF BURBANK, VALLEY PUMPING PLANT (VPP) BOOSTER STATION REHABILITATION PROJECT | The project involved the demolition and replacement of various components in an existing pump station. This includes pumps, pump pads, connecting pipes, valves, and instruments, as well as electrical motor control cabinets, Variable Frequency Drives, transformers, and associated wiring. Additionally, the project required updating the programmable logic controller (PLC) and remote I/O units, including new programming and conduit installation for communication.
CITY OF LAGUNA BEACH , JASMINE STREET STORM DRAIN IMPROVEMENTS | The project involved installing approximately 2,400 linear feet of storm drain pipe across Heisler Park, Jasmine Street, Monterey Drive, Locust Street, and High Drive. This included jacking a 28-inch steel casing and installing a 24-inch PVC pipe beneath North Coast Highway.
Additional tasks included setting up a low -flow diversion with a 12 -inch PVC pipe, installing or replacing catch basins, connecting storm drain laterals, and performing trenching. The project also entailed removing and replacing A.C. pavement and P.C.C. street improvements, striping, pavement markings, and markers, along with traffic control and necessary park and private property improvements and landscaping repairs.
CITY OF LA HABRA , COYOTE CREEK AND IMPERIAL CHANNEL REPAIR PROJECT | The City of La Habra, in collaboration with the California Department of Water Resources, launched the Coyote Creek and Imperial Channel Repair Project. This initiative focused on repairing and upgrading t he Coyote Creek and Imperial Channel to address critical infrastructure needs within the city’s flood management system. The project aimed to mitigate flood risks, enhance water management, and ensure the long-term structural integrity of these key waterways.
CITY OF SAN MARINO, LIFT STATION IMPROVEMENT PROGRAM | This project involved comprehensive upgrades to the City’s sewage lift stations. At Avondale Road, upgrades included new pumps, piping, sump pump, wet well lining, and electrical improvements. Orlando Road received new submersible pumps, guide rails, discharge piping, and cement lining.
Monterey Road upgrades featured pump recoating, piping repainting, a new bypass connection, and electrical testing.
Jimmy Martin brings over 27 years of hands -on experience in construction inspection, with a focus on roadway rehabilitation, street improvements, and public infrastructure upgrades. As a Senior Construction Inspector, Jimmy will be instrumental in ensuring project success through detailed daily field oversight, quality assurance, and consistent contractor coordination. His inspection responsibilities will include oversight of cold milling, asphalt removal and reconstruction, ARAM interlayer and ARHM overlays, curb and gutter replacement, ADA-compliant curb ramps, signing and striping, and traffic signal improvements.
Jimmy is highly experienced in monitoring construction activities for conformance with contract documents, Caltrans standards, and City specifications. Jimmy’s role also encompasses contractor supervision, quality control tracking, safety compliance, and real -time problem -solving. He will maintain thorough documentation through daily reports, photo logs, and material tracking, while reviewing RFIs and submittals and coordinating with contractors, utility companies, and City staff to ensure timely resolution of field issues.
With successfully completed street and infrastructure improvement projects, Jimmy’s deep technical knowledge and field awareness ensure that construction progresses smoothly, efficiently, and with minimal disruption to the public. His attention to detail, proactive communication, and commitment to project excellence make him a critical member of the Z&K team and a trusted representative for the City.
PROJECT EXPERIENCE | Jimmy has served as a Senior Construction Inspector on a wide range of public infrastructure projects that share key features with the City’s upcoming projects. Jimmy was the Senior Construction Inspector on the following projects:
TRANSPORTATION, STREET IMPROVEMENT & TRAFFIC SIGNAL
PROJECTS
CITY OF CORONA, CORONA GREEN ALLEYS IMPROVEMENT PROJECT | The Project aimed to transform selected alleyways in the City into environmentally friendly, functional, and sustainable public spaces. This project includes extensive surface improvements, installation of permeable pavements, and sto rmwater management features to enhance water quality and reduce urban runoff. Key elements of the work involve unclassified excavation, installation of aggregate base and porous asphalt, sidewalk and driveway construction, and the implementation of landscape elements like green infrastructure and solar lighting fixtures. The project incorporates drainage improvements and sustainable infrastructure elements to reduce the heat island effect, create safe pedestrian zones, and improve aesthetics.
CITY OF CORONA , SHERBORN STREET IMPROVEMENT PROJECT | The Sherborn Street Improvement Project significantly upgraded critical local infrastructure within the City of Corona. This comprehensive effort included pavement rehabilitation to improve ride quality and extend ro adway life, as well as new curb and gutter installations to enhance drainage and pedestrian accessibility. The project also included utility improvements to support long-term service reliability and accommodate future growth. Additional scope items included decorative landscaping, ADA- compliant upgrades, and storm drain enhancements.
CITY OF CARSON, CITYWIDE PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This citywide program encompassed pavement rehabilitation and surface treatment improvements across all four districts of the City of Carson.
The project targeted critical roadway segments, sidewalks, curb ramps, and associated infrastructure in need of repair or ADA upgrades. Work included comprehensive traffic control measures, cold milling, leveling course placement, and application of asphalt rubber hot mix (ARHM) to strengthen pavement durability. Additional scope items included slurry sealing for surface preservation, refreshed striping and pavement markings, installation of traf fic loop detectors, and concrete enhancements to curbs, gutters, and ramps. These improvements collectively extended the life of the City’s roadway network, improved pedestrian accessibility, and enhanced overall safety and mobility for the traveling public.
Jimmy Martin, ACI, ICC Cert.
Senior Construction Inspector, Deputy/Special Inspector
LICENSES & REGISTRATION
» ICC Soils Special Inspector
» ICC Reinforced Concrete
Inspector
» Caltrans Various Certifications »
Nuclear Gauge Certification
» ACI Field Technician Grade 1 » 30
Cal/OSHA
» Confined Space Training
» Traffic Control Technician and
Traffic Control Flagger
» Certified California Journeyman
Laborer (AGC)
» Pervious Concrete Technician
(NRMCA)
» Carpentry
» Cement Mason
» Fall Protection
» Traffic Control Safety
CITY OF MANHATTAN BEACH, SLURRY SEAL PROJECT NORTH & SOUTH AREAS OF SAND SECTION | The Project involves comprehensive pavement and surface improvements. The scope of work includes striping and paint removal, full- depth asphalt removal and replacement, asphalt patchwork, crack sealing, slurry sealing, sealcoat application, and installation of signage and striping. Additional features of the project include the construction of decorative crosswalks, pressure washing for paint removal at playgrounds, and updated pavement markings in the playground areas within the north section of the Sand Section area.
CITY OF VERNON, 50
th STREET WATER MAIN REPLACEMENT PROJECT | This critical infrastructure project involved the replacement of an aging 12 -inch cast iron water main along 50th Street with a new ductile iron pipeline to enhance system reliability and water service delivery. The scope of work included trench excavation, potholing, and installation of joint-bonded pipe with full cathodic protection for long-term corrosion resistance. Additional improvements consisted of new water service laterals, fire hydrants, and the safe abandonment of the existing 10-inch cast iron main. Construction activities were completed under active traffic control and in compliance with SWPPP requirements to ensure environmental protection and public safety. The project delivered improved water infrastructure resilience and extended service life for the City of Vernon’s utility system.
CITY OF TORRANCE, RESIDENTIAL & ARTERIAL PAVEMENT IMPROVEMENT PROJECT, I-159/I-139 | This project involves comprehensive pavement improvements across a residential neighborhood and four arterial streets in the City of Torrance. The scope of work includes roadway and pavement rehabilitation, co ncrete improvements, installation of cross gutters, curb and gutter replacement, curb ramp and ADA improvements, and clearing and grubbing. Additional work includes applying slurry seal, cold milling with asphalt concrete (AC) overlay, removal and disposal of existing pavement, and localized pavement repairs. Additional improvements cover tree removal and replacement, asphalt berm replacement, AC base course, installation of PCC (Portland Cement Concrete) sidewalks, PCC driveways and approaches, access ramps, pavement markings and striping on both concrete and asphalt surfaces, installation of raised pavement markers, and City project signage. Specialty elements include the installation of loop detectors, bicycle loop detectors, reconfiguration of sewer piping, water valves, water meters, storm drain manholes, and related features.
CITY OF MANHATTAN BEACH, CYCLE 2 STREET IMPROVEMENT PROJECT | The Cycle 2 Street Resurfacing Project in the City of Manhattan Beach is a Public Works initiative designed to improve roadway infrastructure across seven key street segments, totaling approximately 6,820 linear feet. The project encompasses 27th Street from Laurel Avenue to Pacific Avenue, Agnes Road from 29th Street to Marine Avenue, Flournoy Road from Ardmore Avenue to 19th Street, 29th Street from Blanche Road to Agnes Road, Flournoy Drive from Valley Drive to 33rd Street, Marine Avenue from Blanche Road to Valley Drive, and 14th Street from Pacific Avenue to Laurel Avenue. For five of these segments, the scope includes constructing rolled curbs and gutters, pavement removal, and new pavement installation. The remaining two segments involve milling the existing pavement surface and applying a new asphalt rubber surface course over pavement fabric.
UTILITY PROJECTS (WATER, WASTEWATER, STORM DRAIN)
CITY OF CORONA, LIBERTY AVENUE WATERLINE REPLACEMENT PROJECT | This project involves replacing a 10- inch steel water main with a 12-inch ductile iron pipe over 3,527 linear feet along La Gloria St. and Liberty Ave. The scope includes installing a 12-inch ductile iron pipe with restrained joints, various water control components (such as air/vacuum release valves, fire hydrant blow-off assemblies, and resilient wedge gate valves), and a new water service connection. It also includes removing and replacing existing infrastructure (like vaults and bollards), trench repair s, roadway repairs, asphalt dike replacement, and concrete encasement. The project will also involve abandoning the old water main, implementing traffic control and BMPs, and managing water consumption, disinfection, and flushing.
CITY OF OCEANSIDE, PILGRIM CREEK SEWER LIFT STATION IMPROVEMENTS PROJECT | The project includes civil, mechanical, structural, electrical and controls improvements including existing panel modification, new variable frequency drives, service conduits, conductors, and Supervisory Control Data Acquisition (SCADA) feedback signal for a new suction pressure transducer for water surface elevation level control at the City of Oceanside’s Pilgrim Creek Sewer Lift Station. Pilgrim Creek Lift Station was originally constructed in 1976 and is located at 855 Douglas Drive. The existing lift station is comprised of a concrete wet well, (modified) dry well, two submersible pumps, valves, piping, flow meter, motors, electrical and controls. The pump station has become an operational risk for Collections and reached the end of its useful life. Mr. Henin coordinated the project start and all meetings included preconstruction, field meetings, construction progress meetings, etc., and oversaw all documents pertaining to the project, including change orders, requests for information, as-built drawings, record drawings, contractor submittals, mix designs, etc.
CITY OF RIVERSIDE, LINCOLN AVENUE TECHITE PIPE REPLACEMENTPROJECT, PHASE I | The project involved constructing approximately 3,400 linear feet o f 54-inch cement mortar-lined steel pipe and related appurtenances along Lincoln Avenue in the City of Riverside. This included trenching in the public right-of-way, welding steel pipe, and installing various infrastructure elements. The excavation varied from 4 to 18 feet deep and affected local residential and arterial streets. The scope covered traffic control, including signalized intersections and striping, as well as asphalt paving and concrete work.
Ed Nylund is a highly experienced Senior Construction Inspector with over 34 years of expertise in delivering quality assurance and inspection services on a wide range of public infrastructure projects. His areas of specialization include street improvements, storm drain systems, park and landscape enhancements, traffic signal installations, water and sewer utility upgrades, and municipal facilities construction. Ed has a strong foundation in grading, drainage, and encroachment permitting, and is known for ensuring projects are executed according to design specifications, safety standards, and jurisdictional requirements. During his 20+ year tenure as the Lead Public Inspector for the City of Chino, Ed was instrumental in managing critical public works projects, providing close coordination with contractors, City departments, and outside agencies to ensure seamless delivery.
His technical experience includes inspection of traffic signal systems, signal controller cabinets, conduit and fiber optic installations, pedestrian safety infrastructure, ADA-compliant improvements, and utility service connections. He is also skilled in overseeing pavement rehabilitation and landscape restoration efforts.
Ed’s proactive communication, attention to detail, and problem-solving abilities allow him to anticipate challenges early and maintain project momentum. With deep knowledge of municipal standards, construction methods, a nd regulatory compliance, Ed is well-positioned to support the City through effective field oversight and consistent project execution.
PROJECT EXPERIENCE | Ed has served as a Senior Construction Inspector on a wide range of public infrastructure projects that share key features with the City’s upcoming projects. Ed was the Senior Construction Inspector on the following projects:
CITY OF RIVERSIDE, 36” BUTTERFLY VALVE REPLACEMENT | Deenergizing and dewatering of existing 54” domestic water transmission line. Removal of 20’ section of existing CMLC watermain and valve assembly. Construction of new 20’ section of 54” CMLC watermain including a new 36” BF valve assembly, 8” bypass assembly, cathodic protection and testing station, pipeline/appurtenance pressu re testing and disinfection.
CITY OF ENCINITAS, AIR VALVE AND BLOW OFF REPLACEMENT PROJECT, PHASE 1 | The project involved the replacement of multiple water assemblies across various locations. This included installing new 4-inch and 6-inch AV/AR and blowoff assemblies, along with associated valves, fittings, appurtenances, couplings, and thrust blocks. The work also included constructing new retaining walls at several sites. Each location required specific assembly replacements and additional site work to ensure proper installation and functionality of the new components.
ELSINORE VALLEY MUNICIPAL WATER DISTRICT, HIGHWAY 74 WATERLINE RELOCATION | The project involved replacing an existing 6-inch steel watermain with a new 8- inch PVC waterline along a 1,800-foot segment of Highway 74 within Caltrans right-of-way, near El Cariso Village. It included abandoning the old watermain, installing new valves, and reconnecting existing meters and fire hydrants.
CITY OF FONTANA, SIERRA AVENUE LANDSCAPE MEDIAN PROJECT | The Project involves the enhancement of the landscape and irrigation infrastructure along the Sierra Avenue corridor in Fontana, California, between Foothill Boulevard and Baseline Avenue. This project includes the installation of new hard scape and landscape features, along with an advanced irrigation system to ensure efficient water management and compliance with the City’s water conservation standards. Key components of the project include soil preparation, planting of drought-tolerant species, and installation of automated irrigation systems designed for water efficiency.
CITY OF CORONA, CITYWIDE TRAFFIC SIGNAL OPTIMIZATION PROJECT | This project involves the deployment of advanced traffic sensing equipment and the installation of upgraded traffic signal controllers throughout the City to improve traffic flow and reduce congestion. The work includes integration of adaptive signal technology, replacement of outdated infrastructure, coordination of signal timing along key corridors, and con nection to the City’s traffic management center.
These enhancements are designed to improve travel time reliability, enhance pedestrian and cyclist safety, and support future smart city initiatives.
Ed Nylund, QSP, CWSSWI
Senior Construction Inspector, Traffic Signal/Electrical Inspector
§ Street Improvements
§ Bridges
§ Retaining Walls
§ Stairways
§ Coastal Commission
§ Drainage
Improvements
§ Landscaping
Improvements
§ Project Field Review &
Documentation
§ Quality Control/Quality
Assurance
§ Concrete Pathways
§ Street Improvements
§ Bridges
§ Retaining Walls
§ Stairways
§ Coastal Commission
§ Drainage
Improvements
§ Landscaping
Improvements
§ Project Field Review &
Documentation
§ Quality Control/Quality
Assurance
§ Concrete Pathways
EDUCATION
» California State University,
Sacramento - Industrial Waste
Pretreatment Facility Inspection
» Chaffey Community College -
Business Management
» Maintenance Superintendents
Association -
Basic Supervision in PW
» University of Southern
California - Backflow Assembly
Testing
» San Bernardino Valley
College - Water Supply
Engineering
LICENSES & REGISTRATION
» Water Treatment Operator –
Grade 2 | Certificate No. 17150
» Water Distribution Operator –
Grade 3 | Certificate No. 4903
» QSP Certificate No. 26356
» Traffic Signal Senior Field
Technician III Certificate No.
97687
» Traffic Signal Inspector
Certificate No. SI97687
Thomas "Tommy" Russell brings over 25 years of specialized experience in street rehabilitation, traffic signal modifications, and roadway infrastructure projects. Tommy will provide expert oversight in managing electrical installations, traffic signal upgrades, and ITS system improvements. His extensive background in electrical work, coupled with his comprehensive knowledge of construction inspection and quality assurance, makes him uniquely suited to ensure the success of these projects. With a strong understanding of Caltrans Standard Specifications, Greenbook guidelines, and municipal construction requirements, he ensures that all construction activities adhere to industry best practices, safety protocols, and regulatory compliance.
His proactive problem-solving, technical expertise, and leadership in the field will contribute to the successful execution of this project, ensuring the City receives high-quality infrastructure improvements completed on time and within budget.
For this assignment, Tommy will oversee critical project elements such as traffic signal modifications, fiber optic communication installations, electrical system upgrades, and pedestrian safety enhancements. His responsibilities include conducting daily site inspections, verifying contractor compliance with project specifications, monitoring material quality, and documenting progress to maintain accountability. Tommy will work closely with City staff, traffic maintenance teams, and utility agencies to resolve field issu es efficiently, minimizing disruptions to residents and businesses. With experience delivering over 60 successful traffic signal and infrastructure improvement projects, Tommy’s expertise spans fiber optic installations, ITS integration, pavement rehabilitation, and ADA accessibility upgrades. His background also includes storm drain improvements, trenching and excavation safety, and the implementation of advanced traffic control measures to support public safety.
PROJECT EXPERIENCE | Tommy has served as a Senior Construction Inspector on a wide range of public infrastructure projects that share key features with the City’s upcoming projects. Tommy was the Senior Construction Inspector on the following projects:
CITY OF ALHAMBRA, PEDESTRIAN COUNTDOWN SIGNAL HEAD INSTALLATION PROJECT | The City of Alhambra Pedestrian Countdown Signal Head Installation Project involved the installation of pedestrian countdown signal heads at various signalized intersections throughout the city. This federally funded project was administered under the HSIP Program (HSIPL-5130(022), Cycle 9 H9 -07-001) and required strict adherence to Caltrans Local Assistance Procedures Manual (LAPM) guidelines. The project aimed to enhance pedestrian safety by improving signal vi sibility and ensuring clearer countdown indicators for crossing pedestrians. By implementing these improvements at key intersections, the project contributed to increased public safety, reduced accidents, and improved traffic flow throughout the city. The successful completion of this project reflects the City's commitment to providing safer and more efficient roadways for its community.
CITY OF CATHEDRAL CITY, TRAFFIC SIGNAL IMPROVEMENTS AT 12 INTERSECTIONS PROJECT | The Traffic Signal Improvements at 12 I ntersections Project in the City of Cathedral City was designed to enhance traffic safety and improve pedestrian accessibility at key intersections throughout the city. Funded through the Highway Safety Improvement Program (HSIP), this project implemented several crucial upgrades to improve overall roadway safety. Key improvements included the installation of advanced dilemma zone detection systems to reduce accident risks at signalized intersections and the introduction of protected left-turn phases to improve turning safety and minimize conflicts with oncoming traffic. To further enhance pedestrian safety, pedestrian countdown signal heads were installed to provide clear and reliable crossing information.
CITY OF PALM SPRINGS, HSIP CYCLE 9 TRAFFIC SIGNAL MODIFICATIONS (NINE INTERSECTIONS) PROJECT | The HSIP Cycle 9 Traffic Signal Modifications Project in the City of Palm Springs was initiated to enhance traffic safety and pedestrian accessibility at nine signalized intersections across the city. This federally funded project introduced several critical improvements to enhance roadway safety and improve intersection functionality. Key upgrades included the modification of existing traffic signals to improve visibility, installatio n of advanced dilemma zone detection systems to reduce potential collisions, and the addition of protected left -turn phases to improve turning safety. To further enhance pedestrian safety, pedestrian countdown signal heads were installed to provide clear crossing information.
Thomas Russell, Journeyman Electrician
,,,
Senior Construction Inspector, Senior Traffic Signal/Electrical Inspector
LICENSES & REGISTRATION
» Electrical Training apprenticeship
IBEW Local 441 City of Orange,
California
» Journeyman Electrician, State
Certified
» 30-Hr Cal/OSHA
» Fall Protection
» Traffic Control Safety
» Sexual Harassment Prevention
Training
» Defensive Driving Training
» Caltrans Roadway Safety
Training
» Bridge Inspector Training
» Metro Rail Safety Training
Mr. Eddie Davalos brings over 25 years of extensive experience in public works inspection, construction management, and quality control for capital improvement projects. He has successfully delivered over 35 street improvement projects, showcasing his expertise in managing diverse infrastructure enhancements. His skill set spans street and intersection improvements, median upgrades, ADA -compliant ramp installations, and the development of bike lanes and bike trails. Mr. Davalos is highly experienced in overseeing key technical aspects of construction, including conduit installations, traffic signal upgrades, asphalt overlays, and construction staging. His ability to manage traffic control measures ensures minimal disruption to surrounding communities while maintaining project safety. In addition, Mr. Davalos has extensive experience in site preparation activities such as clearing and grubbing, SWPPP preparation, and utility coordination. He has successfully managed cri tical utility adjustments, including manhole and utility cover modifications, to ensure seamless integration with project improvements. With a strong background in Caltrans standards, Federal Department of Labor regulations, and California Division of Labor Standards Enforcement protocols, Mr. Davalos is adept at ensuring regulatory compliance and equal employment opportunity monitoring. He diligently oversees labor standards, prevailing wage requirements, and workforce diversity goals to ensure that projects meet all legal and contractual obligations. Mr. Davalos's commitment to quality control, safety, and proactive communication has consistently contributed to successful project outcomes. His ability to anticipate challenges, resolve issues efficiently, and maintain strong relationships with stakeholders makes him an invaluable asset to the City’s infrastructure improvement projects.
PROJECT EXPERIENCE | Eddie has served as a Senior Construction Inspector on a wide range of public infrastructure projects that share key features with the City’s upcoming projects . He was the Senior Construction Inspector on the following projects:
CITY OF HEMET , SEWER MAIN REPLACMENT PROJECT | The project involved bypass pumping, removal or abandonment of existing sewer facilities, and the installation of new 8-inch PVC sewer mains and sewer manholes. It also included connecting existing laterals to the new mains and conducting trench repairs. The work was performed along Kirby Street (from Devonshire Ave. to Florida Ave.), Gibbel Park (from G.P. Restrooms to Kirby St.), Florida Ave (from Kirby St. to Gilmore St.), and Thompson Street (from Acacia to Central Ave., with the sewer main located on the opposite side of the street), following the approved plans and specifications.
CITY OF MORENO VALLEY, 801-0081 CITYWIDE PAVEMENT REHABILITATION PROJECT | This project is a citywide rehabilitation of Moreno Valley City streets, involving various pavement and infrastructure improvements. The scope includes cold milling to a depth of 1.5 inches, placing asphalt rubber hot mix (ARHM) overlay, curb ramp installations, and curb and gutter replacements.
CITY OF CHINO, PAVEMENT REHABILITATION AND SLURRY SEAL PROGRAM | This Project includes street rehabilitation and slurry seal of various streets, including, Pipeline Ave from City Limits to City Limits, Chino Ave from City Limits to City Limits and Schaefer Ave from City Limits to City Limits. Scope of work includes pavement improvements, street resurfacing, crack sealing, slurry se al, localized dig -outs, striping removal/install, and traffic loop detectors. Z&K provided preparation of submittal packages, scheduling, mark outs, meetings, cost control, reviewing RFIs, preparing change order proposals, permits, progress billings, subco ntractor coordination, as- built drawings, and final walkthrough/closeout.
CITY OF SAN BERNARDINO, NICHOLSON PARK IMPROVEMENT PROJECT | The Nicholson Park Project involved a comprehensive overhaul of the park’s facilities and infrastructure to better serve the local community. The project featured the selective demolition of outdated structures, followed by grading, drainage, concrete and asphalt paving, fencing, and ballfield renovations. It also included the installation of a new play area, renovation of the existing restrooms, and construction of a new pre -fabricated restroom / snack bar / storage building. Additional improvements consisted of site furnishings, basketball surfacing, shade structures, electrical work, lighting, and the installation of plant ing and irrigation systems. The park includes baseball diamonds (Little League and Senior League) with a concession stand and restroom, an outdoor basketball court, a playground area, restrooms, a Recreation/Community Center, a picnic shelter, barbecue grills, and a community garden.
Eddie Davalos
Senior Construction Inspector
LICENSES & REGISTRATION
» Citrus College, Covina, CA,
Public Works/Earth Work
» OSHA 30 Hour Construction
Safety & Health
» Sexual Harassment
Prevention Training
» Defensive Driving Training
» Caltrans Roadway Safety
Training
» Bridge Inspector Training
» Metro Rail Safety Training
APPENDIX B
ADDENDUM ACKNOWLEDGEMENT
City of Anaheim
DEPARTMENT OF PUBLIC WORKS
Anaheim City Hall
200 S. Anaheim Blvd.
Anaheim, CA 92805
TEL (714) 765-5176
www.anaheim.net
ADDENDUM NO. 1
TO THE REQUEST FOR PROPOSALS (RFP)
To Provide
CONSULTING INSPECTION SERVICES
May 22, 2025
I. GENERAL
The following changes, additions, or deletions shall be made as indicated, and all other conditions shall remain the same.
II. DESIGN-BUILDER QUESTIONS AND ANSWERS
Q1
Is security systems part of this scope? If not, how do we get involve with the city on helping with security systems?
A1 Security systems is not part of the scope. Keep a look out for security system related procurements on OpenGov.
Q2
Can the covers and tabs be excluded from the page count? A2 Yes, cover pages and tabs can be excluded from the page count.
Q3
is it possible to request an extension due to Memorial Day holiday? A3 A day extension is granted. Request for Proposals will be on due on 5/30/2025 at 5:00 pm.
Q4
Please confirm that Scope for contract is both Construction Management (CM) and Inspection - Title of RFP is "Consulting Inspection Services".
A4 Scope of work for contract is only for Inspection Services.
Q5
Please confirm whether material testing and special inspections are part of the scope of work or if "coordination" will be limited to scheduling with the City's own material testing consultant.
A5 Material testing is not part of the scope but may include coordinating with the City’s own material testing consultant. If special
Q6
Please confirm whether Labor Compliance services are included or whether scope of work is limited to coordinating with the City's Labor Compliance and CWA consultant.
A6 Scope does not include Labor Compliance services or coordinating with City’s
Q7
What is the administrative process for depositing money into the Union Benefit Trust Fund for a non-Union firm? Can a non-Union firm pay fringe benefits into the Union Trust on behalf of non-Union employees? A7
A subscription agreement must be signed and an account registered for the employee performing covered work. The logistics for depositing funds to the City of Anaheim
Addendum No. 1, Dated May 22, 2025
Request for Proposals (RFP) to provide Consulting Inspection Services
A7
union trust will be described in more detail shortly after each pre-job conference for covered project work. See Section 2.7.2 of the CWA for more details. A non-union firm can pay fringe benefits to the union on behalf of non-union employees.
Q8
Our company currently pays our employees for fringe benefits within our Benefits Program, therefore, the “Union benefits” will be considered a Direct Cost to our firm. Are these costs to be included in the Labor Rates or can they be billed as an ODC?
A8 Any fees or charges need to be included in the employee or classification rate that is submitted as part of the rate schedule.
Q9
Is the City going to require that we discontinue paying our covered employees our own benefits and replace them with the monies going into the Union Trust? If not, our bill rates will increase substantially as a result of paying double benefits.
A9 The City does not require discontinuation of benefits to employees performing covered work.
Q10
Since employees are not required to join the Union, per the CWA, can non- Union employees participate in the Union Benefit Programs for the funds deposited on their behalf?
A10 Yes, non-union employees can participate in union benefit programs provided they meet the minimum requirements of the program.
Q11
Section 3.9: Regarding “Core Employees”, if the Union Hall does not have a qualified inspector for the project, can a second “Core Employee” from the Consultant be used as “any other available source”?
A11 Yes, if the union cannot provide an employee, another core employee can be used.
Q12
The RFP states “The City may amend the CWA to incorporate minor modifications after proposal submissions. The minor modifications are anticipated to make certain CWA requirements more accommodating without substantially changing the CWA’s terms and conditions. Minor modifications, if any, are anticipated to be finalized and incorporated into the CWA prior to award of these consulting agreements.”
a. What does the City consider “minor modifications”?
b. What “minor modifications” are being considered?
A12 The City does not anticipate any modifications to the CWA at this time.
Q13
As a non-union company, will a consultant who hires employees through the union referral program (union employees) be required to participate in the union grievance process identified in Article 10 of the CWA? A13 Yes.
Q14
Consultant employees are paid on a bi-weekly basis; will the consultant be required to pay employees hired through the union referral program (union employees) on a weekly basis?
A14
The DIR allows bi-weekly payments by contractors to its workers, however and if the project is either fully funded or partially funded by Federal Funds, City of Anaheim
Addendum No. 1, Dated May 22, 2025
Request for Proposals (RFP) to provide Consulting Inspection Services
A14
the workers are to be paid on a weekly basis as the Federal Regulations require submission of CPRs on a weekly basis.
Q15
The first paragraph of Page 3 of 10 discusses “Support Services” to be provided. Is this an addition service to the Inspection Services requested, or a part of the Inspection Services?
A15 The first paragraph of page 3 refers to support services as part of the Inspection Services.
Q16
Some duties listed in the “Typical Duties & Responsibilities” section include duties not “standard” for Construction Inspectors, including preparation of weekly statement of working days and review of shop drawings. Can you please clarify/confirm that these are indeed required to be performed by our inspectors?
A16 Inspectors would be required to prepare the weekly statement of working days for City staff to review, accept and send off to the contractor performing construction work.
Q17
A “Desired Knowledge & Experience” requirement is “Thorough knowledge of change order analysis, critical path scheduling, including the ability to evaluate schedules submitted by contractors and to evaluate and anticipate downstream impacts to those schedules during construction.” As this is not a something that construction inspectors typically deal with, can you please clarify this requirement?
A17 It is a desired knowledge that inspectors have an understanding of it but not a requirement.
Q18
Participation Level for current and succeeding DBE program years.” Could you please clarify this requirement? Is there a DBE participation requirement for this contract?
A18 This would only apply depending on the funding source and it will be a case by case. Specific requirements would be provided depending on the funding source.
Q19
What is the duration of this contract?
A19 The initial term is two (2) years, unless sooner terminated with the Director of Public Works authority to allow for no more than two(2) additional two (2) year terms after the initial term. Refer to the TERM Section of sample agreement.
RESPONSE SUBMISSION DEADLINE IS EXTENDED TO
FRIDAY, MAY 30, 2025, AT 5:00 PM
End of Addendum
City of Anaheim
Addendum No. 1, Dated May 22, 2025
Request for Proposals (RFP) to provide Consulting Inspection Services
The Prospective Consultant shall acknowledge receipt of all addenda by signing and enclosing each addendum form in its proposal submittal. Failure to do so may result in a rejection of his/her submittal.
Signature Print Name
Firm Name Date
Z&K Consultants, Inc 05/30/2025
Crystal Fraire, President
E. FEE SCHEDULE May 30, 2025 Samantha Bahena, Contract Administration City of Anaheim – Department of Public Works Construction Services Division 200 S. Anaheim Boulevard, Suite 276 Anaheim, CA 92805 Subject: Fee Schedule for Request for Proposals to Provide Consulting Inspection Services Dear Ms. Bahena & Selection Committee, Z&K Consultants, Inc. is pleased to submit our Cost Proposal for Consulting Inspection Services in response to the City of Anaheim’s Request for Proposals dated May 1, 2025, and Addendum No. 1 dated May 22, 2025, which we acknowledge. This proposal has been prepared in accordance with all requirements set forth in the RFP. Our cost proposal includes a fully burdened hourly billing rate schedule reflecting all wages, fringe benefits, overhead, profit, and standard tools, equipment, and supplies. We confirm that our hourly rates are identical for both onsite assignments utilizing City-provided facilities and for offsite work performed from home or field offices. Accordingly, a single set of rates is provided per classification. In full compliance with California Labor Code and DIR prevailing wage requirements, we have included applicable overtime and double time rates for inspection classifications. No travel-related, printing, or incidental administrative expenses will be billed separately; all such costs are included in our proposed rates as required by the RFP. Our rates: • Are fixed per classification (not presented as ranges or averages) • Will remain firm for the entire initial agreement term • Are subject to annual escalation, not to exceed the CPI for the Los Angeles–Anaheim–Riverside region, per BLS data.
Rate Composition and Compliance | All hourly billing rates provided in our fee schedule are fully burdened and include the following components: direct labor costs, fringe benefits, general and administrative overhead, and profit. These rates also reflect full compliance with the California Labor Code, including prevailing wage laws and the applicable determinations issued by the Department of Industrial Relations (DIR). Z&K Consultants, Inc. ensures that all classifications subject to prevailing wage are billed in accordance with the most recent applicable DIR determinations, inclusive of allowable increases. We understand that project-specific costs will be negotiated through task orders issued under the master agreement, and that no work shall commence without a City-issued purchase order. Community Workforce Agreement Compliance | Z&K Consultants, Inc. acknowledges that certain project assignments under this agreement may be subject to the City’s Community Workforce Agreement (CWA). We are fully prepared to execute the Letter of Assent and comply with all applicable provisions of the CWA when assigned to covered “Project Work.” Insurance & Indemnification | Z&K Consultants, Inc. maintains all required insurance coverage in accordance with Exhibit B of the RFP, including general liability, workers’ compensation, automobile, and professional liability insurance. We are prepared to meet the City’s indemnification provisions without exceptions or modifications. DIR Registration | Z&K Consultants, Inc. and all proposed personnel are currently registered with the California Department of Industrial Relations (DIR) in accordance with Labor Code Section 1725.5. Digital Submission | This Cost Proposal is submitted electronically via OpenGov in accordance with the submittal instructions. Z&K agrees that digital submission constitutes valid execution for proposal purposes. Attachments (submitted as a separate PDF) | Z&K Consultants, Inc. 2025 Billing Rate Schedule
Sincerely, Crystal Fraire, PE President (Principal-in-Charge) 17130 Van Buren Blvd. #122, Riverside, CA Phone. (951) 310-7470 | [email protected] COST PROPOSAL TERMS & CONDITIONS Hourly Rates and Labor | The proposed costs are based on estimated hours and billing rates for core staff. A complete Hourly Rate Sheet is attached, including rates for additional personnel who may be assigned as needed to support project delivery. Staff Substitution & Support | Qualified alternate or additional staff may be assigned as needed, billed at the applicable rates. Our personnel are cross-trained and capable of adapting to dynamic project requirements. Subconsultant Costs | Subconsultant services, if required, will be billed at actual cost plus a 10% markup to cover coordination, contract oversight, and administrative handling. Exclusions | Unless otherwise specified, the following services are excluded from this cost proposal: construction management (including resident engineering and schedule or cost control functions), labor compliance monitoring and certified payroll review, geotechnical engineering and material testing, surveying and construction staking, SWPPP preparation, inspection, or reporting, environmental monitoring or mitigation, permit acquisition or regulatory agency coordination, preparation of as-built drawings, procurement of equipment or materials, and public outreach or community notification. These services may be added to the scope of work through a mutually agreed-upon contract amendment or task order, as needed. Overtime & Double Time | Overtime (1.5x) is billed for hours beyond 8/day or 40/week. Double time (2.0x) applies on Sundays and holidays. Overtime will be billed when work extends due to contractor schedule or project needs. Our inspector will remain on-site during active construction regardless of pre-approval. If pre-approval is not obtained, Z&K may assist in contractor reimbursement requests as needed. Late Payment Interest | Pursuant to California Public Contract Code §20104.50, Z&K may assess interest at 10% annually on any undisputed invoice unpaid more than 30 calendar days from receipt, unless the City disputes the invoice in writing within 7 days. Invoicing | Invoices will be submitted monthly and no later than three months after services are rendered. Invoices will include a summary and detailed time logs itemized by staff, date, and work order/task. Supplemental backup documentation beyond standard deliverables will be provided only upon written request and will be billed at $148/hour plus labor. Any meetings or discussions related to invoicing will be billed at standard contract labor rates and are outside the not-to-exceed amount. This cost proposal shall remain valid for at least one hundred eighty (180) calendar days from the date of submittal. We appreciate the opportunity to support the City of Anaheim in delivering high-quality capital improvement projects through professional construction inspection services. We look forward to contributing our experienced inspection team to your program and ensuring responsive, high-quality support throughout the contract term. Please don’t hesitate to contact us with any questions.
Zack Faqih, PE, QSD/P Vice President 17130 Van Buren Blvd. #122, Riverside, CA (949) 637-5040 | [email protected] 17130 Van Buren Blvd, Suite 122 | Riverside, CA 92504 | 951.310.7470 | www.zandkconsultants.com
STAFF REGULAR TIME RATE1 OVERTIME RATE (MON-FRI)2 OVERTIME RATE (SAT)1 OVERTIME RATE (SUN/HOLIDAY) Principal ............................................................................... $242.00 – – – Structures Inspector6 ............................................................ $220.00 ............ $330.00 .... $330.00 ............ $421.00 Senior Construction Inspector (Prevailing Wage) 3, 5, 6 ............. $188.00 ............ $282.00 .... $282.00 ............ $373.00 Senior Construction Inspector (Special Shift) 3, 4, 5, 6 ................. $196.00 ............ $294.00 .... $294.00 ............ $385.00 Accessibility Expert/CASp Inspector6 ..................................... $208.00 ............ $312.00 .... $312.00 ............ $403.00 Deputy Inspection (Prevailing Wage) 3, 5, 6 ................................ $189.00 ............ $283.50 .... $283.50 ............ $374.50 Public Works Inspector (Non-Prevailing Wage) 5, 6 .................... $172.00 ............ $258.00 .... $258.00 ............ $349.00 Structures Inspector7 ............................................................ $258.00 ............ $387.00 .... $387.00 ............ $478.00 Senior Construction Inspector (Prevailing Wage) 3, 5, 7 ............. $226.00 ............ $339.00 .... $339.00 ............ $430.00 Senior Construction Inspector (Special Shift) 3, 4, 5, 7 ................. $234.00 ............ $351.00 .... $351.00 ............ $442.00 Accessibility Expert/CASp Inspector7 ..................................... $246.00 ............ $369.00 .... $369.00 ............ $460.00 Deputy Inspection (Prevailing Wage) 3, 5, 7 ................................ $227.00 ............ $340.50 .... $340.50 ............ $431.50 Positions are subject to overtime rates billed at 1.5 times the regular rate for all time over eight (8) hours in a single day or work performed on Saturdays. Double time rates apply for work performed on Sundays and holidays. The hourly rates include wages, fringe benefits, and general and administrative overhead and fee, as well as typical supplies, tools, and equipment required to perform services. Construction management software is not included in the base rate. 1. The listed rate applies to the first four hours of overtime during the week and/or the first eight hours of overtime on Saturdays. All overtime beyond four hours during the week or eight hours on Saturdays is billed at the Sunday/holiday rate. 2. Prevailing Wage Rates are subject to increases per the State of California’s Department of Industrial Relations Wage Rate Determinations. Z&K's billing rates will increase in line with the DIR increase, plus overhead and profit. The current rates are based on Determination SD-23-63-3-2023-2D, issued on 8/22/2023. 3. A Special Shift is defined as any shift starting after 5:00 PM and before 6:00 AM. 4. Minimum callout requirements for inspection staff are in line with Industrial Welfare Commission Order #16-2001: o Cancellation of 8 hours scheduled inspection after inspector’s arrival on site: 4-hour minimum. o Cancellation of 4 hours scheduled inspection after inspector’s arrival on site: 2-hour minimum. 5. For contracts involving public works inspection services, Z&K requires the awarding public agency to complete DIR form PWC-100 for Z&K as the prime contractor, specific to the awarded contract name and amount. A half-hour per week, per inspector, will be billed for labor compliance on all Prevailing Wage inspection assignments. 6. Rate is NOT subject to the CWA. 7. Rate is subject to the CWA. Overall Notes: • Reimbursable Expenses (Other Direct Costs): Ordinary identifiable non-salary costs directly attributable to the project (e.g., regular commuter travel costs, standard equipment, tools, and software) are included in the estimated fee. Extraordinary expenses (such as oversized and/or color reproduction costs, vehicle identification decals, site facility hard phone lines or internet service, non-commuter project mileage, remote travel over 50 miles one-way, overnight postage/couriers, etc.) will be billed at actual cost plus 15% for overhead and administration. Travel costs to casting/fabrication yards or batch plants will include the hourly billing rate plus travel expenses as listed in the Caltrans Travel Guide (State rates). Mileage is billed at the current IRS rate ($0.655/mile). An allowance for extraordinary charges is included as Other Direct Costs (ODC) in the fee table. Extraordinary charges beyond the estimated ODC allowance will not be billed unless specifically included in the contract or pre-approved by the Client in writing. • Fees for Subconsultant Services: Billed at actual cost plus 15% to cover overhead and administration. • Web-Based Contract Administration: Selected/specified cloud-based service billed at cost plus 15%. • Escalation: Unless specified otherwise (such as for prevailing wage personnel), all billing rates are subject to annual review for Consumer Price Index escalation or 3%, whichever is greater. Exclusions to Scope and Fee: • Legal advice • Specialized software (other than MS Office Suite and MS Project) Z&K CONSULTANTS, INC. STANDARD BILLING RATE SCHEDULE (2025) Rates Effective January 1, 2025 through December 31, 2025 Future years subject to annual review for escalation, effective January 1 of each year, based on the Consumer Price Index (CPI) for the Riverside-San Bernardino-Ontario, CA region, not to exceed the published BLS index for All Urban Consumers. (Not Seasonally Adjusted).
CONSTRUCTION INSPECTION SERVICES