Hushmand Associates, Inc.
250 Goddard
Irvine, CA 92618
p. (949) 777-1266
w. haieng.com
e. [email protected]

June 12, 2025

City of Anaheim
Department of Public Works
200 S. Anaheim Boulevard, Suite 276
Anaheim, CA 92805

SUBJECT: Proposal for On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services - HAI Proposal No. P25-0612

Hushmand Associates, Inc. (HAI) is pleased to submit this Proposal to the City of Anaheim for professional Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services in support of the City’s ongoing Capital Improvement Program and related infrastructure initiatives. This proposal has been prepared in response to the City’s Request for Proposal titled On -Call Additional Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services.

We appreciate the opportunity to continue supporting the City of Anaheim through this important on-call contract. As a California- certified Small Business Enterprise (SBE) with over 35 years of experience, HAI brings a dedicated team of engineers, geologis ts, inspectors, technicians, and environmental specialists who have successfully delivered similar services for numerous southern California municipalities , state and federal agencies, and public utilities. Our firm operates a fully certified materials testing laboratory located in Placentia and is equipped to provide responsive, high -quality services across a wide range of construction projects.

Should you have any questions or require additional information, please do not hesitate to contact us at (949) 777-1280 or [email protected]
.

Sincerely,
HUSHMAND ASSOCIATES, INC.

Ben Hushmand, PhD, PE
President, Principal Engineer

Page | 1

City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services Firm’s Complete Legal Name: Hushmand Associates, Incorporated Date of Incorporation: July 8, 1999
Main Office Address: 250 Goddard, Irvine, CA 92618
Main Laboratory Facility: 1012 Segovia Cir, Placentia, CA 92870 Federal Employer I.D. Number: 33-0869986
Main Contact Name: Ben Hushmand, PhD, PE
“2013 James E. Ballinger Engineer of the Year”
Faculty Associate, California Institute of Technology (Caltech), 1990-2004
Phone Number: (949) 777-1266 Ext. 1280
Email Address: [email protected]
No. of Years in Service: 35
HAI is a geotechnical, earthquake, environmental, soil & materials testing, and specialty inspection services firm with over 35 years of experience delivering comprehensive engineering, inspection, and construction quality assurance services across Califor nia and elsewhere in the country. We provide professional services, including feasibility studies; geotechnical and geologic investigations and design; and field inspections and materials testing for soil, aggregates and rocks, concrete, shotcrete, grout and lightweight cellular concrete (LCC), metals and reinforcement, asphalt, masonry, and geosynthetics. Our in-house laboratories are certified by AASHTO, CCRL, Caltrans, City of Los Angeles, and validated by USACE. We hold cer tifications as a Small Business Enterprise (SBE) and are registered with DIR, DGS, and SAM. HAI’s technical staff are Caltrans-qualified and certified by ACI, ICC, AWS, USACE, and others, performing inspections for transportation, water resources, energy, and public infrastructure projects. HAI’s clients span municipal agencies, public utilities, school districts, healthcare industry, solid waste and energy sectors, and private developers. Our work emphasizes public safety, engineering excellence, and cost-effective solutions that comply with the highest industry standards.

HAI’s team includes licensed Civil (PE), Geotechnical (GE), and Geological (PG, CEG, CHG) professionals. Our field technicians are certified for Caltrans soil and aggregate testing; and ACI/ICC concrete, welding (AWS-CWI), and bolting inspections. HAI’s staff is OSHA 40-hour HAZWOPER certified, and our supervisors have 30 -hour training for construction. We operate labs in Irvine and Placentia, CA, supporting transportation, water, energy, and infrastructure projects. Resumes of key personnel are presented in Appendix A.

HAI has a long successful history of providing consulting engineering and construction monitoring services to cities such as Los Angeles, Anaheim, Long Beach, Irvine, Yorba Linda, Laguna Beach, Laguna Niguel, Laguna Hills, San Juan Capistrano, Lake Forest , Montebello, Burbank, Glendale, La Cañada Flintridge, Pasadena, Arcadia, Downey, San Gabriel, El Monte, Carson, Garden Grove, Bell Gardens, West Covina, Brea, Culver City, Costa Mesa, Newport Beach, San Bernardino, and Lynwood; counties such as Los Angeles, Orange, San Bernardino, Riverside, San Diego, Ventura, Santa Barbara, San Luis Obispo, Kern, Kings, Fresno, Mono, Monterey, Santa Clara, and Alameda; transportation agencies/entities such as LA Metro, OCTA, Union Pacific, Metrolink, and BNSF; and utilit y agencies/companies such as Los Angeles Department of Water and Power (LADWP), Southern California Metropolitan Water District (MWD), City of Anaheim Public Utilities, SCE, PG&E, Southern California Gas Company, San Diego Gas & Electric (SDG&E), Irvine Ranch Water District, Yorba Linda Water District, Walnut Valley Water District, Golden State Water Company, City of Burbank Water and Power, San Gabriel County Water District, and Cities of Laguna Beach, Arcadia, and Sierra Madre Water Services.

Examples of current and recent past HAI’s “On-Call Geotechnical Engineering Services” contracts include:
• City of Anaheim Public Utilities Department (CAPUD) – Water Division Contact Person: Candice Espinoza, PE, (714) 765-5323 (2019-2024) • County of Los Angeles Department of Public Works (LACDPW) Contact Person: William Man, (626) 458-7991, Date: 2019-ongoing.

City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services

Page | 2

• Los Angeles Department of Water and Power (LADWP) On-call Geotechnical Engineering Contact Person: Dr. Jianping Hu (213) 367-0855, Dr. Yangsoo Lee (213) 367-1048, Dr. Saeed Jorat (213) 367-1078 Date: 2009-2015 & 2025-ongoing (sub to WSP).
• City of LA On-call Contracts as part of A/E firms, Bridge and Street Improvement Departments Contact Person: Scott Gibson, PE, Senior Civil Engineer (213) 485-5101, Date: 2004-ongoing. • Orange County Public Works – Flood Control Division (OCPW) Contact Person: Krishna Nadaraja, P.E., G.E., Senior Civil Engineer, 714-567-7879, Date: 2006-2016 • Metropolitan Water District of Southern California (MWD) On-call Contracts, as part of A/E firms Contact Person: Dr. Mohsen Beikae, 213-217-7182, Date: 2017 - ongoing. • East Valley Water District (EVWD)
Contact Person: Nathan Carlson, (909) 888-8986, Date: May 2025 – ongoing. • City of Downey Public Works Department On-call Contract Contact Person: Edwin J. Norris, (562) 869-7331, Date: 2016-2021. • Moulton Niguel Water District (MNWD)
Contact Person: Steve Merk, (949) 795-6799; Jin Kim, 949-831-2500, Date: 2015-2019. • Southern California Edison (SCE) – Power Generation Group – MP&E Contact Person: Zaid Ahmad, (626) 302-0367, Date: 2007-ongoing. • Southern California Edison (SCE) – Transmission & Distribution Group Contact Person: Gennady Tsarev, (909) 274-1443, Date: Date: 2015-2018; 2024-ongoing. • City of Carson Public Works Department on-call contract Contact Person: Mr. Rick Boutros, P.E., (310) 952-1700 Ext. 1830, Date: 2007-2021. • City of Yorba Linda
Contact Person: Jamie Lai, (714) 961-7170, Date: 2021-ongoing. • Yorba Linda Water District (YLWD)
Contact Person: Reza Afshar, PE, PMP, (714) 701-3106, Date: 2012-ongoing. • South Coast Water District (SCWD)
Contact Person: Michele Collins, (949) 499-4555 x3175, Date: 2016 - 2020. • Pacific Gas & Electric (PG&E) / TPG
Contact Person: Max Reyhani, (949) 637-0118, Date: 2006-2019.

RELATED EXPERIENCE AND REFERENCES
HAI has a long history with the City of Anaheim Public Utilities Department , supporting infrastructure upgrades and water system rehabilitation projects. While not all the following projects are within the RFP scope of “Materials Testing, Deputy Inspection, and Environmental Services,” they highlight HAI's history of trusted performance for the City of Anaheim Public Utilities. These projects demonstrate our capability to coordinate with City staff, deliver high-quality engineering and testing services, and adhere to local and state standards, including Caltrans LAPM protocols and prevailing wage laws. • Nohl & Weir Canyon Water Storage Tank Sites, Annual Geotechnical Monitoring (2021–2024) • La Palma Complex Reservoir Rehabilitation and Pump Station Replacement (2016–2018) • High Capacity Potable Water Well No. 59 (2014–2016)
• Water Reclamation Facility, An Award Winning Project (2009) • Sewer Improvement Lines Project (2011)

City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services

Page | 3

Hushmand Associates, Inc. (HAI) has extensive experience in providing expert Geotechnical Engineering and Construction Quality Assurance (CQA) services including observation and testing for street rehabilitation and improvement projects, ensuring compliance with design specifications and engineering standards. Examples of HAI realated experience include the followings:
• City of Perris – 2nd Street Pavement Evaluation (2024) • City of La Cañada Flintridge –Street Resurfacing Program (2020), Ocean View Blvd Slope & Road Repair (2016), Street Resurfacing & Materials Testing (2013) • City of Carson – Sepulveda, Albertoni, Turnmont, Del Amo Blvd, Broadway, Avalon Blvd, Wilmington Ave Improvements, and Citywide Overlay/Slurry Seal Programs (2007–2020) • City of Paramount – Paramount Blvd Rehab (2017), Annual Slurry Seal Program (2008) • City of Los Angeles – Avalon Blvd, Broadway, Figueroa St, Wilmington Ave Improvements; Sixth Street Viaduct, Riverside Dr Viaduct, Soto St Widening, and multiple Bridge Seismic Retrofits (2008–2023) • City of Arcadia – Concrete Pavement Rehab, Foothill Blvd (2016); Baldwin Ave Rehab, Santa Anita Corridor, and City Street Improvements (2003–2013)
• City of Santa Ana – Warner Avenue Phases 2A & 2B, South Main Corridor, Lincoln Ave Pedestrian Improvements (2017–Ongoing)
• City of Downey – Fire Stations 1–4, Civic Center Improvements, Paramount Blvd, Lakewood Blvd, Rio San Gabriel Park Improvement, and Brookshire/Gardendale Rehab Projects (2011–2020) • City of San Gabriel – Del Mar Ave Rehab, Great Streets, Bilton Rd, and Intersection Improvements (2007–2016)
• City of El Monte – Ramona Blvd & Valley Blvd Intersection, Aviation Blvd Right Turn Lane Widening (2017)
• City of Costa Mesa – Harbor Blvd and Adams Ave Intersection Improvements (2011) • City of Lake Forest – Alton Pkwy Gap Closure, El Toro Rd, Santa Margarita Pkwy, and Los Alisos Blvd Improvements (2008–2012)
• City of Montebello – Mines Ave., Frankel Ave., Beverly Blvd., Bluff Rd., and Westmoreland Drive Improvements (2014–2016)
• City of Lynwood – State Street and Cedar Avenue Pavement Distress Evaluation (2015) • Citywide Annual Overlay & Slurry Seal Programs – Multiple Cities (2007–2015) •
Other CQC/CQA Experience:
• USACE Isabella Dam – A 5-year CQC/CQA Project for Dam Safety Mod. & Seismic Retrofit (2018-2023) • Moreno Valley Compressor Modernization (SDGE) – Geotechnical & Materials Testing (2023-ongoing) • World Energy Paramount Refinery* – Foundation & Liquefaction Analyses, Construction Monitoring & Testing (2020-2024) [*Outstanding Project Award – Honorable Mention in the Private-Large Category at the California Geotechnical Engineering Association (CalGeo) Annual Conference in April 2025] • El Toro Water District – Full QA/QC for $35M recycled water pipeline expansion (2011 – 2018) • MWD Casa Loma Fault Crossing – Pipeline resilience design for 13-ft fault displacement (2018-2023)

PROJECT APPROACH AND UNDERSTANDING
Hushmand Associates, Inc. (HAI) understands that the City of Anaheim is seeking qualified firms to support its Capital Improvement Program and other infrastructure initiatives through an on -call contract that provides materials testing, special inspection, and environmental services. These services are vital to ensuring public City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services

Page | 4

safety, construction quality, regulatory compliance, and long -term performance of City assets. The scope of work may vary by project, however, HAI recognizes that timely response, accurate reporting, and dependable coordination are essential to the success of these projects, especially when work involves federally funded requirements and adherence to Caltrans LAPM standards. The City requires qualified professional support in three key areas:

Materials Testing
• Field and laboratory testing of soils, aggregate base, asphalt concrete (AC), and Portland cement concrete (PCC)
• In-place density and compaction testing using nuclear gauges • Sampling and testing per Caltrans, ASTM, and AASHTO methods • Laboratory analysis for R-values, Atterberg limits, sieve analysis, compressive strength, asphalt gradation, and more
Deputy Inspection
• Special inspection services by ICC-, AWS-, and ACI-certified inspectors • Oversight of structural elements including:
o Reinforcing steel
o Structural masonry
o Structural steel and welding
o Concrete placement and anchorage systems
o Shotcrete and epoxy anchor installation
• Compliance with City of Anaheim, CBC, IBC, and contract documents Environmental Engineering & Science Services
• Soil, groundwater, and vapor sampling
• Corrosivity testing (sulfate, pH, resistivity, chloride) • Hazardous materials screening (e.g., lead, asbestos, PCBs) • Monitoring and documentation for environmental compliance • Assistance with regulatory coordination (e.g., CEQA, SWPPP, AQMD) HAI fully understands the scope, scale, and expectations of this work. Timely mobilization, real- time coordination with the City’s Senior Inspector, and accurate field reporting will be essential to maintaining the project schedule and ensuring public safety in active construction zones.

WORK PLAN
Initial Coordination & Task Order Review
• HAI will review each task order issued by the City to determine scope, timeline, and personnel requirements.
• The assigned Project Manager (Alex Hushmand, PhD, PE, GE) will be the single point of contact for all technical and scheduling coordination.
• For each task, we will confirm scope, testing frequencies (per Exhibit 16 -R or City specs), special inspection needs, and documentation protocols.

City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services

Page | 5

Personnel Assignment & Field Dispatch
• HAI will assign field staff certified by ACI, ICC, and Caltrans based on the project type (e.g., PCC, AC, rebar, masonry).
• Field technicians will be scheduled via our central dispatch coordinator and will report to the project site on time with proper equipment, forms, and safety training. • For environmental services or special inspections, specialized team members will be assigned and equipped based on site-specific requirements.

Field Testing, Sampling, and Inspection
Field services may include:
• Compaction testing with nuclear gauge and sand cones
• Concrete sampling and slump/air/temperature tests
• Asphalt core sampling, extraction/gradation
• Deputy inspection for rebar, structural steel, welding, shotcrete, anchors • Environmental sampling of soil, groundwater, or air (as applicable) All tests will be conducted in accordance with Caltrans, ASTM, and AASHTO standards and City requirements.

HAI will ensure daily reports are submitted promptly and that any non -conforming results are flagged to the City immediately.

Laboratory Testing
Samples collected in the field will be delivered to our Placentia laboratory, which is Caltrans-, AASHTO-, and USACE-certified. Laboratory testing may include:
• Soil index properties (Atterberg, sieve, moisture-density, R-value) • Concrete cylinder compressive strength
• Asphalt extraction and stability
• Corrosivity testing (pH, chloride, sulfate, resistivity) Test results will be reviewed by senior staff and signed by licensed engineers.

Reporting & Documentation
• Daily field reports, inspection logs, and lab results will be compiled and transmitted on time— typically within 24–48 hours.
• HAI will maintain a secure database of all test results and reports for easy access by City staff. • Final reports will be submitted with summary tables and conformance assessments, and may include photographic documentation and geotechnical evaluations when applicable.

Compliance and Quality Control
• All work will be performed under the supervision of a licensed Civil or Geotechnical Engineer. • HAI follows a rigorous internal QA/QC program to ensure accuracy, traceability, and defensibility of all testing and inspection data.
• We are fully compliant with prevailing wage laws, certified payroll requirements, and Community Workforce Agreement (CWA) protocols.
• For federally funded projects, we adhere strictly to Caltrans LAPM, including Exhibit 16-R testing frequencies, reporting formats, and documentation standards.

City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services

Page | 6

ORGANIZATIONAL STRUCTURE
Hushmand Associates, Inc. (HAI) is structured to efficiently deliver high- quality materials testing, deputy inspection, and environmental services across multiple concurrent projects. Our team integrates lic ensed engineers and geologists, certified field personnel, lab technicians, project managers, and administrative staff to ensure full technical coverage, regulatory compliance, and responsive service to the City of Anaheim. Please see HAI Organization Chart provided in Appendix B.

1.0 Executive Oversight
At the executive level, Ben Hushmand, PhD, PE, serves as President and Principal Engineer, providing high- level technical oversight and ensuring compliance with City, Caltrans, and QA/QC standards.

2.0 Project Management and Lead Geotechnical Engineer
HAI assigns Alex Hushmand, PhD, PE, GE to act as the single point of contact for all Anaheim task orders. He is responsible for:
• Day-to-day coordination with City staff and contractors • Task order execution and resource allocation
• Oversight of testing schedules, inspector assignments, and reporting • Ensuring compliance with Caltrans LAPM, prevailing wage laws, and CWA provisions The Project Manager is supported by Lead Geotechnical Engineer , Environmental Scientists , and Senior Project Engineers who supervise all field and lab operations. The Lead Geotechnical Engineer for this on-call contract will be Bidjan Ghahreman, PhD, PE, GE, who was a reviewer for the City of Anaheim, Department of Public Works geotechnical reports & associated plans for a wide variety of residential, commercial, and public works projects for more than 5 years (2015 to 2020).

3.0 Field Operations
HAI’s Dispatch Coordinator manages technician and inspector scheduling. Based on project needs, dispatch selects the most qualified personnel certified by:
• ACI (concrete testing)
• ICC (deputy inspection)
• Caltrans (soil, aggregate, asphalt testing)
Field staff report directly to their assigned Project Engineer and submit daily reports to both the lab and the City’s representative.

4.0 Laboratory Services
All laboratory operations are overseen by a Senior Laboratory Supervisor, with testing performed by certified technicians. The lab is fully Caltrans-, AASHTO-, and USACE-certified, and all test results are reviewed and signed by licensed Civil or Geotechnical Engineers before submission.

5.0 Administrative Support
HAI’s administrative staff supports certified payroll, documentation tracking, certified inspector logs, and prevailing wage compliance. The admin team also assists with reporting deadlines, invoicing, and coordination with subcontractors, if applicable.

City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services

Page | 7

Dispatch Process – Summary
HAI utilizes a centralized dispatch system to assign certified field technicians and inspectors based on project needs, location, and required qualifications. A dedicated Project Manager or Field Coordinator serves as the single point of contact for scheduling and coordination. Requests are received via phone or email and are matched to qualified staff with the appropriate ACI, ICC, or Caltrans certifications.

Personnel are dispatched from our Irvine and Placentia offices with proper equipment, PPE, and documentation. Field staff provide daily reports, and coordination is maintained throughout the project to accommodate schedule changes, emergency work, or additional scope.

This system ensures responsive, effi cient support for City task orders while maintaining technical and regulatory compliance.

REPRESENTATIVE CLIENT REFERENCES
City of Los Angeles – Bridge & Street Improvement Program Contacts:
• Mr. Amit Shah, PE – Sr. Program Director, Parsons
(714) 673-7152 | [email protected]
• Mr. Dung D. Tran, PE – Project Manager (currently with LA Metro) (818) 404-5028 | [email protected]
• Mr. Scott Gibson, PE – Sr. Civil Engineer, City of Los Angeles (213) 485-5101 | [email protected]
Scope of Work:

Geotechnical and environmental design support, field monitoring, and materials testing during construction.

Representative Projects:
• Valley Boulevard Multi-Modal Transportation Improvement (2024–Ongoing) • North Spring Street Viaduct over LA River (2013–2020) • Soto Street Widening, East Los Angeles (2013–2022)
• Huntington Drive Multi-Modal Improvement (2021–2023)
HAI Key Staff: Ben Hushmand, Bidjan Ghahreman, Alex Hushmand

City of Downey – On-Call Geotechnical Services
Contact: Mr. Edwin J. Norris – Deputy Director of Public Works (562) 869-7331 | [email protected]
Scope of Work:

Geophysical surveys, field exploration, lab testing, and recommendations for pavement, foundations, retaining walls, and park subgrade improvements.

Representative Projects:
• Lakewood Boulevard Improvements, Phases 3B & 3C
• Rio San Gabriel Park Soil Stabilization
• Civic Center and Library Expansion, Fire Stations Upgrade HAI Key Staff: Ben Hushmand, Alex Hushmand, Bala Jayaprakas City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services

Page | 8

Yorba Linda Water District
Contact: Mr. Reza Afshar, PE, PMP – Senior Engineer
(714) 701-3106 | [email protected]
Scope of Work:

Geotechnical design, instrumentation, and construction observation/testing services.

Representative Projects:
• Fairmont Booster Station Upgrade (2017–2018)
• Lakeview Reservoir Slope Monitoring and Instrumentation (2022-ongoing) HAI Key Staff: Ben Hushmand, Bidjan Ghahreman, Alex Hushmand

SAFETY PROTOCOLS
HAI is committed to maintaining th e highest standards of workplace safety and regulatory compliance. We maintain a proactive safety program that includes regular training, job hazard analysis, site -specific safety plans, and adherence to OSHA and Cal/OSHA requirements. Our field personnel receive comprehensive safety training and are equipped to recognize and mitigate jobsite hazards before they become risks.

HAI is certified and registered with industry -recognized compliance platforms including ISNetworld (ISN) and Veriforce, which verify our firm’s adherence to safety standards, insurance requirements, and regulatory compliance. These certifications reflect our commitment to maintaining a safe, qualified, and reliable workforce, and enable us to meet the stringent prequalification criteria required by public agencies and utility clients throughout California.

CERTIFICATIONS AND LICENSING
All testing and inspection services provided by Hushmand Associates, Inc. (HAI) will be performed under the direct supervision of licensed Civil and Geotechnical Engineers registered in the State of California. Our engineers oversee all technical aspects of field and laboratory operations, ensuring strict adherence to applicable standards, project specifications, and City of Anaheim requirements.

HAI employs a team of highly trained and certified field and laboratory personnel, including technicians and inspectors who hold current certifications from the following agencies:
• Caltrans (for materials testing and lab procedures)
• ACI (American Concrete Institute) – Concrete Field Testing Technician – Grade I • ACI (American Concrete Institute) – Concrete Laboratory Testing Technician – Level 2 • ICC (International Code Council) – Reinforced Concrete, Structural Masonry, Structural Steel & Welding, Soils Special Inspector
• OSHA – Construction Safety and Health, Confined Space, Trenching & Excavation Safety Our personnel are continuously trained and evaluated to maintain certification compliance and uphold the quality assurance standards expected on public works projects. Certification records are available upon request and included in the proposal Appendix C.

City of Anaheim, Department of Public Works
On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services Page | 9

SUNCONTRACTORS
Depending on the scope of work, we plan to utilize the following qualified subcontractors to support project execution:

ABC L
iovin Drilling
1180 E Burnett St, Signal Hill, CA 90755
https://www.abcdrilling.com
Tel: 562-981-8575
Contacts: Mr. Hugo Lopez, Operations Manager ([email protected]); Mr. Bill Borgo Services: Geotechnical and Environmental Drilling
Spectrum
Geophysics
8216 Lankershim Blvd. #12, North Hollywood, CA 91605
[email protected]
Tel: 818-886-4500
Contact: Ms. Beckie Ullett ([email protected]) Services: Utility Locating and Geophysical Surveying
Twinin
g, Inc.
18071 Mt Washington St Unit A, Fountain Valley, CA 92708 4811 Airport Plaza Drive, Suite 220, Long Beach, CA 90815 https://www.twininglabs.com
Tel: 949-394-1077
Services: Materials Testing and Laboratory Services
Eurofi
ns Environment Testing Southwest, LLC.
2841 Dow Ave., Ste. 100, Tustin, CA 92780
www.EurofinsUS.com/Env
Tel: 714-895-5494
Contact: Ms. Jennifer Moffatt, Project Manager
Services: Environmental laboratory Testing

APPENDIX A
Resumes of Key Staff

Ben Hushmand, PhD, PE President, Principal Engineer

Page 2 of 4 ends

RELEVANT PROJECT EXPERIENCE

Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, Kern County, CA- HAI is providing engineering laboratory support and performing construction quality control (CQC) laboratory and field testing services for the project prime Contractor. HAI has established a laboratory facility at the Project site validated by the USACE to perform laboratory materials testing on soil samples and aggregate materials used for the dam concrete structures, and filters, drains and s lope rock revetment for Phase II improvements of the existing earthfill Isabella dam. HAI additionally provides as-needed geotechnical engineering consulting support services during construction. Client: Flatiron, Dragados, Sukut Joint Venture (FDSJV, 2019 – July 2023).

Permanent Penstock Protection, Shakeflat Creek Crossing, Mammoth Pool Reservoir, Madera County, CA – Project Manager responsible for providing geotechnical design services and construction support services for design and construction of permanent protection of the existing penstock across Shakeflat Creek which was damaged during previous flood seasons. Scope of work included preparation of engineering geology and geotechnical engineering reports; review of plans and specifications; performing geologic mapping of excavations for replacement of unsuitable foundation materials; observation and documentation of excavation dewatering and subgrade preparation; construction of proposed reinforced concrete spillways, cutoff/seepage barrier walls; drainage system under and around the spillway, and in- situ and laboratory testing of backfill materials and reinforced concrete. Client: SCE (2018-2020).

Headworks Reservoir, Los Angeles Dept. of Water and Power (LADWP), Los Angeles, CA - Project
Manager for a 5-year long geotechnical investigation to study seismic earth pressures and soil-structure interaction effects on dynamic response of underground water storage and conveyance systems and structures during earthquakes. Following an extensive technical review of the existing analytical methods, centrifuge model tests and numerical analyses were performed to investigate lateral seismic earth pressures development on walls of underground restrained structures. HAI investigated soil-structure interaction phenomenon to understand the mechanism, configuration, and intensity of the lateral earth pressures that develop on the walls of an underground structure restrained at the top and bottom during a seismic event; particularly rigid concrete water-storage structures. Centrifuge testing and numerical modeling were performed by HAI engineers at University of Colorado, Boulder and HAI’s main office in Irvine to develop calibrated numerical and constitutive models for design of underground reservoirs and water conveyance systems. Client: LADWP (2010-2016).

Casa L
oma Siphon No. 1 Fault Crossing Project, Casa Loma, CA – Project Manager, geotechnical design and construction support services for anal ysis, design, and construction of the Colorado River Aqueduct Casa Loma Siphon Barrel No. 1 (CLS -B1) crossing the Casa Loma Fault. Conducted consolidated - isot
ropically-und
rained triaxial (Tx -CIU) and Consolidated -isot
ropically-draine
d triaxial (Tx -CID) tests to
evaluate soil parameters for constitutive models used in finite element modeling of pipeline fault crossing.

Soil-structure interaction effects on the pipeline due to fault displacements were modeled and effect of using special backfill materials on pipe stresses was studied. Client: MWD/ Carollo Engineers, 2018-2023.

Sepul
veda Feeder PCCP Rehabilitation & Pump Stations in Pacific Palisades & Venice Beach, CA – Project Manager, to provide geotechnical engineering services for the phase I (Phase I Enviromental Site Assement Study, Geological Study and Seismic Hazard Evlauation) of this project. The 42 -mile long Sepulveda Feeder conveys treated water from the Jensen Plant in Granada Hills to an interconnection with the Second Lower Feeder in Torrance. Approximately 35 miles of the feeder is comprised of PCCP with diameters ranging from 150 inches at Jensen Plant to 84 inches at the interconnection with the Second Lower Feeder. The remainder of the line is constructed of welded steel pipe with diameters ranging from 94 inches to 97 inches. Additionally, HAI is currently providing geotechnical engineering Ben Hushmand, PhD, PE President, Principal Engineer

Page 3 of 4 ends

services for design and construction of a new 13-MG water tank and two major pump stations for MWD in Pacific Palisades and Venice Beach. Client: MWD/HDR/TetraTech, 2018-ongoing Expert Review of LADWP Water System Pipeline Breaks in Summer of 2009, Los Angeles, CA- LADWP operates a complex water distribution system, extending over 7,200 miles, comprised of pipelines made of various materials. During summer of 2009, several high-profile water main breaks occurred in Los Angeles, raising concerns from the public with respect to the safety and overall condition of the City’s water distribution system. As a consequence of the public outcry for an explanation, the Mayor and City Council requested an independent investigation to study the cause of the increase in water pipeline breaks and the overall vulnerability of the City’s water supply and distribution network. HAI as the prime contractor was commissioned to assemble an investigation team staffed by multidisciplinary experts in water distribution systems as well as other related engineering fields from academia and industry to investigate the pipeline breaks. Dr. Hushmand acted as the project manager and led the team of experts to perform a detailed exhaustive investigation, prepare a comprehensive report on the causes of the breaks, and provide a presentation to the City Council. Client: LADWP (2009-2011).

Vibration Monitoring during Widening of Existing Ford Road/Bonita Canyon Dr. Undercrossing Northbound Bridge on State Route 73, Orange County, CA - Project Manager for conducting a vibration monitoring program to measure vibrations generated due to pile driving operations for installation of a deep foundation system for the proposed widening of the Existing Bonita Canyon Dr. undercrossing bridge on State Route 73. The measurements focused on monitoring ground velocity time histories and peak particle velocities (PPV) at surface and depth to evaluate its effects on structural integrity of the Metropolitan Water District (MWD) concrete encased 55-inch water pipeline passing under Bonita Canyon Dr. Bridge between Abutment 1 and Bent 2. Vibrations were measured with surface and downhole 3- directional geophones (triaxial seismometers). Four seismometers (3 on the ground surface in a row perpendicular to the pipeline alignment and 1 at depth) were used to evaluate attenuation of the ground vibrations with distance from source and its potential adverse effects on structural integrity of the feeder during construction compromising the reliability and continuity of the MWD conveyance system. Client: Jacob Engineering Group/MWD.

Jensen Filtration Pl ant Post-Northridge Earthquake Seismic Investigation, Granada Hills, CA An experimental and engineering analysis investigation was performed by HAI to study dynamic response of several structures at the filtration plant and determine effect of the site soils on recorded ground motions at the filtration plant. The site soils liquefied in some areas during the 1971 San Fernando earthquake, which resulted in major damage at the facility. The Northridge earthquake, however, did not cause substantial damage at the site of the plant. Understanding dynamic response of soils at this site and its effect on water filtration/treatment and conveyance structures is essential because of the critical nature of facility, which should remain operational in the event of a major earthquake. Client:

URS/USGS/MWD.

Reconnaissance Level Review of Multiple Sites (30) for Construction of New Dams used as Emergency Water Storage Facilities, CA - A reconnaissance level geological and seismic evaluation of 30 potential sites for construction of several large dams throughout California was performed. A table listing critical geologic and seismic information on these sites was developed and used for screening and selection of a few potential sites for further more detailed evaluation. Client: MBI/MWD.

Reconnaissance Level Review of Conveyance System to Transport Water from Riverside County to Orange County - A reconnaissance level review of conveyance system to transport water from Riverside County to Orange County was performed. Client: Michael Baker International (MBI)/MWD.

Strong Ground Mot ion Evaluations for MWD Upper Feeder Santa Ana River Bridge Crossing, Riverside Ben Hushmand, PhD, PE President, Principal Engineer

Page 4 of 4 ends

County, CA- Project Manager for seismic hazard and strong ground motion evaluations for seismic retrofit of the MWD upper feeder (~ 10-ft diameter steel pipe) Santa Ana River Bridge crossing in Riverside County, CA. HAI developed representative ground motion time histories for nonlinear analysis and design of the bridge seismic retrofit and base-isolation system. Client: IDS Group/MWD F.E. Weymouth Treatment Plant, La Verne, CA- Vibration was measured during extraction of shoring system installed at Metropolitan Water Districts of So. Calif. (MWD) Water Treatment Plant in La Verne, San Gabriel Valley, CA. A 28-ft deep & 27-ft wide trench was excavated for installation of a new plant inlet conduit. Temporary shoring support system for this trench consisted of steel plates and H-beams installed to depth of 40 ft below ground surface and was extracted using a vibratory technique. MWD was concerned with the effects of ground vibrations on surrounding buildings and filtration basin resulting from extraction of the shoring system beams. A nalysis consisted of constructing attenuation curves as well as analyzing time history data by performing Fast Fourier Transform (FFT). Client: J.R. Filanc/ MWD.

Windy Ridge Reservoir and Access Road, Anaheim, CA - Project Manager responsible for field investigation, analysis, and design of a 1.6 MG capacity above-ground reinforced concrete tank and 0.5 mile of water pipeline and access road traversing difficult mountain terrains in Anaheim Hills, Orange County. The access road and tank site construction required extensive engineering analyses for design of slopes, MSE walls, tiebacks, and large diameter drilled piers for slope stabilization. Performed slope stability analysis considering reduction in shear strength values due to fractured and discontinuous joint pattern using the Hoek-Brown model. Developed plans and specifications for installation of a series of multi-tiered MSE walls up to 35 feet in height along the one-half mile access road connecting the site and the public street. Client: MWH Americas/Anaheim Public Utilities Dept.

Page 1 of 5 ends

ERNESTO VICENTE, PhD, PE, GE

PRINCIPAL ENGINEER/ DIRECTOR OF GEOTECHNICAL ENGINEERING

Registration
• Geotechnical Engineer, CA No. G2302
• Civil Engineer, CA No. C46895
• Hazardous Operations Course (OSHA, Environmental) 29 CFR 1910.120 • Water Survival Course, API RPT‐4 and RPT‐7 (2011 Refresher) Education
• Ph.D., Civil/Geotechnical Engineering, Rensselaer Polytechnic Institute, Troy, New York, 1983 • M.S. Civil/Geotechnical Engineering, Rensselaer Polytechnic Institute, Troy, New York, 1978 • Hydroelectric Developments, Universidad Nacional, Buenos Aires, Argentina, 1973 • Civil Engineer Degree, Universidad Nacional, Cordoba, Argentina, 1972 Year of Experience:
• 40+ Years
Dr. Vicente has 40 years of experience in geotechnical and earthquake engineering, and engineering support to environmental projects in the United States, Latin America, Southeast Asia and Middle East.

Managed and provided technical expertise for geotechnical investigations, geologic hazard assessments, civil engineering design and construction quality assurance for a wide spectrum of infrastructure, industrial, commercial, and environmental projects.

RELEVANT PROJECT EXPERIENCE
Isabella Lake Dam Safety Modification Project (DSMP), Phase II Improvements of Dams and Spillway, Lake Isabella, Kern County, CA – A US Army Corps of Engineers (USACE) Project (2019 – July 2023) - Director & Lead Geotechnical Engineer - P rovided engineering laboratory support and performing construction quality control (CQC) laboratory and field testing services for the project prime Contractor.

HAI established a complete soils and aggregated testing laboratory facility at the Lake Isabella Dam Project site, validated by the USACE to perform laboratory materials testing on soil samples and aggregate materials for the dam. This included concrete structures, and filters, drains and slope rock revetment for Phase II improvements of existing earthfill Isabella dam. HAI additionally provide d as-needed geotechnical engineering consulting support services during construction planned to extend from 2019 to 2023. Client: Flatiron, Dragados, Sukut Joint Venture (FDSJV).

Shakeflat Creek Crossing Emergency Repair Project , Near Mammoth Pool, Sierra National Forest, Madera County, California (2018-2019) - Lead Geotechnical Engineer, CQA Director for Soils & Concrete – Completed a geotechnical engineering and engineering geology investigation and CQA/CQC services for a Southern California Edison (SCE)’s damaged penstock pipe and concrete spillway. This penstock feeds the Mammoth Pool hydroelectric power plant, through a tunnel, consist ing of an underground 13 -foot diameter steel pipe that was exposed as a result of erosion of its soil cover at Shakeflat Creek Crossing, associated with high stream flows during winter storms. The tunnel and 13 -foot diameter steel pipe (penstock) at Shakeflat Creek Crossing are part of the water conveyance system for the Mammoth Pool Project located in the central Sierra Nevada, within the San Joaquin River watershed and the Sierra National Forest. The Project is operated as a reservoir-storage type plant, where water is taken from the San Joaquin Ernesto Vicente, PhD, PE, GE Principal Engineer, Lead Geotechnical Engineer

Page 2 of 5 ends

River, Ross Creek, and Rock Creek and conveyed to the Mammoth Pool Powerhouse through the Mammoth Pool Tunnel. The geotechnical/geologic investigation assisted in developing an appropriate approach to re-establish cover and downstream support for the steel pipe connecting the two sections of the Mammoth Pool Power Tunnel at Shakeflat Creek Crossing where it was exposed due to erosion.

Construction observation and testing services (CQA/CQC) of soils and concrete included geologic mapping, geotechnical inspection during excavation of unsuitable materials by a California Certified Engineering Geologist (CEG) , as well as observation and in -situ density testing of subgrade and backfill materials, construction of a reinforced concrete spillway/channel, a rectangular reinforced concrete stilling basin, and installation of a drainage system . The construction activities were continuously observed and recorded by HAI’s field geologist, and as-needed by HAI’s Geotechnical Engineer of Record (GE, EOR) and Certified Engineering Geologist (CEG) . Client: Southern California Edison (SC E) and Tetra Tech.

Sepulveda Feeder PCCP Rehabilitation & Pump Stations in Pacific Palisades & Venice Beach, CA (2018 – ongoing) – Lead Geotechnical Engineer – P rovided geotechnical engineering services for the phase I (Phase I Enviromental Site Assement Study, Geological Study and Seismic Hazard Evlauation) of this project. The 42-mile long Sepulveda Feeder conveys treated water from the Jensen Plant in Granada Hills to an interconnection with the Second Lower Feeder in Torrance. Approximately 35 miles of the feeder comprises PCCP with diameters ranging from 150 inches at Jensen Plant to 84 inches at the interconnection with the Second Lower Feeder. The remainder of the line is constructed of welded steel pipe with diameters ranging from 94 inches to 97 inches. Additionally, HAI is currently providing geotechnical engineering services for design and construction of a new 13-MG water tank and two major pump stations for MWD in Pacific Palisades and Venice Beach. Client: Metropolitan Water District (MWD) of Southern California.

Casa Loma Siphon No. 1 Fault Crossing Project, Casa Loma, CA (2018-2023) – Lead Geotechnical Engineer –Provide geotechnical design support services for the analysis and design of the Colorado River Aquaduct Casa Loma Siphon Barrel No. 1 (CLS-B1) crossing active Casa Loma Fault Segment, part of the regional San Jacinto Fault Zone System. Conducted consolidated -isot ropically-und rained triaxial (Tx -CIU) and Consolidated-isotro
pically-draine
d triaxial (Tx -CID) tests to evaluate soil parameters for constitutive models used in finite element modeling of pipeline fault crossing. Soil-structure interaction effects on the ERDIP (earthquake resistant ductile iron pipe) line due to lateral fault displacements were modeled; effect of using specially manufactured backfill materials on pipe stresses was studied. Client: Metropolitan Water District (MWD) of Southern California.

New Ocean Outfall and Tunnel, Feasibility Studies, County of Los Angeles (2007 – 2016) - Lead Geotechnical Engineer during for geotechnical characterization of a 112 square-mile ar ea, as part of a $25
million geotechnical engineering contract. Thirteen prospective alignments were initially evaluated as part of Feasibility Studies extending from the Joint Water Pollution Control Plant (JWPCP) located Carson south and southwest and the Pacific Ocean. Study area include Port of Los Angeles, Wilmington, San Pedro and Palos Verdes, with possible tunnel lengths ranging from 7 - to p
ossibly 19-miles
for a 20 -foo
t-diam
eter
sewage tunnel and marine outfall including tunnel shafts and outfall diffusers and risers as part of a three- phas
e exploration and preliminary as well as final design program. Client: County of Los Angeles Sanitation Districts (LACSD).

Periodic Independent Hydroproject Technical Audits in Argentina (2012-2024): Alicura Dam [1050 MW Hydroelectric Development], Annual Independent Technical Audit El Chocón Earthfill Dam, 1200 MW Hydroelectric Development, Neuquén and Rio Negro Provinces, and Rio Hondo Dam, Santiago del Estero, Argentina - Independent technical consultant, providing assessments of integrity and static and seismic stability conditions of two large earthfill dam and hydroelectric projects. Including an 87 -meter- Ernesto Vicente, PhD, PE, GE Principal Engineer, Lead Geotechnical Engineer

Page 3 of 5 ends

high (285 -foot-high) El Chocón Dam earthfill dam built between 1967 and 1973, and a 443 -foot-high earthfill Alicura dam built between 1980 and 1985. These dams are periodically audited (every two years or annually depending on dam age ) as part of Argentina’s dam safety evaluation program, which is regulated by ORSEP (Regional Organization for the Safety of Dams). Scope of work included review of recommendations of developed during previous dam safety technical audits (civil engineering discipline), conditions of various parts of the project, instrumentation including measured pore pressures, drainage flow rates, and deformations, for various instrumented sections. Advice for future geotechnical studies and dam monitoring and maintenance was provided. Clients : AES Generation (Alicura Dam) and ENEL Generation (El Chocón Dam), Argentina, S.A., Hydroelectrica Tucuman (Rio Hondo Dam), periodic consultations.

Rio Hondo Dam, Santiago del Estero Province, Argentina - Technical Audit of Seismic Stability Re- Evaluation (2013-2014). Member to a committee of three independent technical consultants assessing the integrity and static and seismic stability conditions of an existing earthfill dam built in 1960 being re - evaluated as part of Argentina’s periodic seismic safety evaluation program, which is regulated by ORSEP (Regional Organization for the Safety of Dams). Seismogenic sources in the region were poorly understood at the time of dam design, and histori c seismicity suggested that the area was more seismically active than originally anticipated. Advice for future studies was provided regarding compilation of field data (CPT soundings and seismo -cone), paleo-seismology studies, re -evaluation of activity parameters and maximum capable earthquake for nearby Guasayán and El Rosario faults, and updated previous probabilistic and deterministic ground motion studies, site response analyses (free - field), and earthfill dam dynamic analyses. Client: Hidroelectrica Rio Hondo, S.A.

Gardella Dam, Near Chinese Camp, California (2002 -2005). Geotechnical Engineer of Record for a Geotechnical investigation and engineering in support of the design of an earth and rockfill dam and water storage reservoir, including permitting from California Department of Dam Safety (DSOD). The proposed zoned (heterogeneous) earth and rockfill dam was approximately 70 feet high, 1,000 feet long along its crest, and founded on slate bedrock formation after removal of residual soils and treatment of foundation rock. It includes a low -permeability core keyed into competent foundation bedrock, protected with a system of internal filters and drainage layers, with upstream and downstream rock fill shells and rip rap revetment on the upstream slope. The reservoir pool was to be lined with a combined low permeability soil layer and a geo -synthetic membrane, and will cover an area of about 18 acres with a maximum operating pool depth of about 46 feet, and a maximum operating volume of 380 acre feet. Given the design height of retained water and storage capacity, the dam is under jurisdiction of the State of California Department of Water Resources (DWR), Division of Safety of Dams (DOSD). Client: Bing Yen and Associates (BYA)/ATC Associates/KFM Geosciences and RBF Engineers for the Sierra Conservation Center.

Bouquet Canyon Dam, Los Angeles National Forest, California (2002). Geotechnical engineering in support of seismic retrofit of a 220 -foot-high earthfill dam founded on a 40 -foot-thick layer of alluvium.

Site characterization included an updated assessment of regional seismicity, selection of design earthquake events, and liquefaction potential and residual shear strength evaluations. Engineering analyses included static, pseudo-static, and “post-earthquake” slope stability evaluation (based on post - liquefaction residual shear strength of alluvial soils), and preparation of a stability technical memorandum. Client: GeoPentech/Los Angeles Department of Water and Power.

Morro Bay Power Plant Expansion and Perimeter Levee Evaluation, Morro Bay, CA - Lead geotechnical engineer for: a) design and construction of two new 530 MW natural gas fired power plants, including four gas turbine generators; b) re -evaluation of perimeter earth dike/ embankment and foundation soil characterization. Project included 2,200 -foo
t long of existing perimeter earthen berms/levee
approximately 16 to 21 feet in height, and possible construction of additional 1,400 feet of p erimeter Ernesto Vicente, PhD, PE, GE Principal Engineer, Lead Geotechnical Engineer

Page 4 of 5 ends

levee for protecting/enclosing a proposed expansion and modernization of the existing El Morro power plant. Client: Fluor, 1998‐1999.

North Simi Drain - Storm Water Detention Basin, City of Simi Valley, CA - Project geotechnical engineer in support of a site investigation, including seismic hazard evaluation, subsurface soil characterization and conclusions regarding earthquake-indu
ced liquefaction potential, design parameters for earthwork and foundations of a 500-foot-lon
g 24-foo
t-high
water detention earth embankment and emergency spillway and water intake appurtenance structures. Client: Bing Yen and Associates (BYA)/ City of Simi Valley, 1999.

Day Creek Debris Retention and Flood Control Dam, Rancho Cucamonga, California . Geotechnical engineering and testing support during construction of a rockfill debris dam on Day Creek that is used for irrigation and flood control purposes. At normal levels, the impoundment has a surface area of 13 acres.

Normal storage is 140 acre feet. The maximum dam height is 90 feet and its length is 975 feet. It drains an area of 5.1 square miles. Work included a full-scale rockfill "test" embankment prior to the production of rock fill placement to assess required rockfill layer thickness, appropriate compaction equipment, and minimum compaction effort. Large-scale field density testing of the test embankment was accomplished with a 6 -foot-diameter ring, and involved up to about 4,000 pounds or rockfill material per test. In addition, topographic survey measurements (leveling) were performed after each pass of the compaction equipment to assess rockfill densification and effectiveness of the compaction effort. Large scale maximum index density tests by shaking table were performed in the geotechnical testing laboratory on rockfill specimens. Large-scale particle size distribution tests of rockfill materials (up to 10 inches in size) were performed in the field. Also provided observation, probing and/or testing of dam alluvial foundation and rock abutments during subgrade preparation and "production" fill placement. Construction was completed in 1988. Prepared for WCC/County of San Bernardino, 1987 ‐1988.

OTH

ER RELEVANT PROJECT EXPERIENCE
New 4.1-MG Santa Anita No. 3 Reservoir, Rancho Cucamonga, Los Angeles County California. Seismic hazard evaluation. Client: Robert Bein, William Frost & Associates (RBF/MBI), 2000.

Proposed 3A-1 Reservoir, Rancho Cucamonga, Los Angeles County California. Seismic hazard evaluation.

Client: Diaz‐Your
man & Associates, 2000.

Proposed 2.8 -MG Grove Street Reservoir, City of Sierra Madre, Los Angeles County . Geotechnical investigation and seismic hazard evaluation. Client: Cities of Sierra Madre and Arcadia, 2000.

Proposed 5.5 -MG Norwalk Park Reservoir, City of Norwalk, Los Angeles County . Geotechnical investigation and seismic hazard evaluation. Client: City of Norwalk and U.S. Corps of Engineers, 1999.

New 2.7- MG Whittier Reserv oir, Suburban Water Systems Plant 235, City of Whittier, Los Angeles County. Geotechnical investigation and seismic hazard evaluation. Client: Suburban Water Systems, 1999.

New 4.2-MG Longden and 6.0-MG Van Nuys Reservoirs, Cities of Monrovia and San Marino, Los Angeles County. Geotechnical investigation and construction quality assurance for two new water storage reservoirs and connecting pipeline. Client: San Gabriel Valley Water District, 1998‐1999.

New 3.5 -MG Saint Joseph Reservoir No. 1, City of Arcadia, Los Angeles County . Geotechnical investigation and construction quality assurance for a new water storage reservoir. Client: San Gabriel Valley Water District, 1998‐1999.

North Simi Drain Storm Water Detention Basin, City of Simi Valley, Ventura County, California .

Geotechnical investigation and seismic hazard evaluation for a 24 -foot-high water detention embankment. Client: City of Simi Valley, 1999.

Ernesto Vicente, PhD, PE, GE Principal Engineer, Lead Geotechnical Engineer

Page 5 of 5 ends

Water and Sewer Pipelines for the Proposed City of California Prison Facility, Kern County, California .

Geotechnical investigation for 1.3- and 4.5-mile water and sewer pipelines. Clients: Dana Parson Roubal and Associates, and Corrections Corporation of America, Inc., 1998.

North Bear River Levee, Wheatland, Yuba County, California . Geotechnical investigation and integrity evaluation for a three-mile-long levee section. Client: Rust E&I, Ensign & Buckley, 1996‐1997.

Sedimentation Basin, Simi Valley, Ventura County, California. Geotechnical Investigation for a 30 -foot- high water retention embankment. Client: Rust E7I, Waste Management of California, 1996.

Eaton Tailings Dam Extension, Missouri. Review of geotechnical and earthquake engineering aspects of dam improvements required for flood control. Client: Fluor/Saint Joe Minerals, 1992‐1993.

Nuclear Service Pond Dam, Catawba Standby, North Carolina. Seismic safety re-evaluation study of the existing embankment dam. Client: NTS Engineering, 1986.

Costa Oriental (Eastern Coastal) Dikes of Lake Maracaibo, Venezuela. Evaluation of seismic integrity and subsidence-induced cracking, and mitigative measures for a 43 km long existing dike. Client : Maraven, 1984‐1987.

Limay Medio Hydroelectric Complex (Michihuao and Pichi Picun Leufu Dams), Rio Negro and Neuquén provinces, Argentina. Geotechnical engineering investigation and dam design. Client : Hidronor S.A., 1982‐1983.

Static and Seismic Slope and Spillway Stability, Alicura Dam, Rio Negro and Neuquén provinces, Argentina. Review and additional engineering studies on the seismic stability evaluation of a 350 -foot high earthfill dam, power plant and spillway. Client: Hidronor S.A., 1981‐1982.

Arro
yito Dam, Rio Negro and Neuquén provinces, Argentina. Geotechnical services during construction of an 8 million cubic yard, 100 -foot high earthfill dam (construction quality assurance, routine field and soil testing). Cli
ent: Hidronor S.A., 1975‐1977.

El Ch
ocón-Cerros Colorados Hydroelectric Complex, Rio Negro and Neuquén provinces, Argentina .

Construction contract coordination ($500 million USD) and technical oversight for the construction of the Planicie Banderita (including power plant, spillway, penstocks, river diversion channels, tunnels, cofferdams, access roads, etc.), Loma de la Lata, and Portezuelo Grande Dams, between owner and international consultants. Client: Hidronor S.A., 1973‐1975.

Page 1 of 4 ends

BIDJAN GHAHREMAN, PHD, PE, GE

PRINCIPAL GEOTECHNICAL ENGINEER

Registration
• Civil Engineer, CA No. C80886
• Geotechnical Engineer, CA No GE3111
Education
• Ph.D. Civil Engineering; Geotechnical Engineering (2004), University of Illinois at Urbana-Champaign (UIUC)
• M.S. Civil Engineering; Geotechnical Engineering (1993), Massachusetts Institute of Technology (MIT) • B.S. Mining Engineering; Engineering Geology (1987)
• Tehran University, Tehran, Iran
Year of Experience:
• +17 Years
Dr. Ghahreman is a Registered Professional Engineer (PE, Civil) and Geotechnical Engineer (GE) in the State of California with more than 17 years of experience in site geotechnical investigations; shoring and stabilization of deep excavations and slopes; earth retaining structures; foundation evaluation and design of shallow and deep foundations; ground improvement; seepage analysis; dewatering; geotechnical instrumentation and monitoring; geotechnical numerical analysis; and geotechnical earthquake engineering including site-specific analysis, site-response analysis, and soil–structure interaction.

RELEVANT PROJECT EXPERIENCE
MWD Sepulveda Feeder Pump Stations in Culver City and Los Angeles, California , CA (2023 – ongoing) : Principal Geotechnical Engineer responsibe for performing seismic hazard and liquifaction settlement evaluation of two proposed pump station (PS) sites for the purposes of characterizing subsurface conditions, evaluating site soils properties and stability for support of the new structures and the structures to be retained in place, and providing engineering support for construction of the proposed structures.

Metropolitan Water Reclamation District of Greater Chicago; Chicago, Illinois, (2013 -2014): Lead Geotechnical Engineer & Modeler, developed and analyzed models of a +21,000 acre-ft reservoir planned at the location of an existing quarry in jointed rock mas s subjected to large lateral stresses, using the 3 - Dimensional Distinct Element computer program 3DEC. Developed post -processing tools and interpretation procedures. Defined and developed all components of the 3DEC models, including intact rock properties, rock joints designation and parameters, and initial state of stress. Reviewed substantial volume of data on decades -long history of blasting and excavation at the quarry and incorporated the findings into simulation of excavation in stages in the 3DEC models. Reviewed significant volume of monitoring data on movements in and around the quarry, including inclinometers, extensometers, and surface surveying data. Refined and calibrated the 3DEC models from comparison of simulated movements with recorded movements.

Moulton Niguel Water District (MNWD) – Water Reclamation Plant 3A Expansion, Mission Viejo, CA – Geotechnical Investigation for Plant Expansion (2021-2022): Lead Geotechnical Engineer responsible for a geotechnical Investigation to assess the general geologic and geotechnical conditions underlying the Bidjan Ghahreman, PHD, PE, GE Principal Engineer

Page 2 of 4 ends

locations of the proposed solids handling facilities improvements at the MNWD Plant 3A facility in the city of Mission Viejo, California (MNWD Project No. 3A18.S02). The selected improvements will be in specific areas in the northern and southern portions of Plant 3A. HAI prepared a geotechnical investigation report to provide design recommendations for the proposed grading operations and structural foundations. The report presents HAI’s findings, conclusions, and recommendations for the project. Client: Hazen & Sawyer Moulton Niguel Water District – Blackbird and Solitaire Easement Pipeline Rehabilitation in the City of Aliso Viejo (2021-2022): Lead Geotechnical Engineer responsible for providing Geotechnical Investigation services to assess the geotechnical conditions along a proposed new pipeline in the city of Aliso Viejo, California. The project involves abandonment of an existing pipeline and installation of a new pipeline that runs approximately 200 feet and connects the existing pipeline within Blackbird cul -de-sac to an existing pipeline within a street called “ Westwing” downslope from the cul -de-sac. T he proposed alignment of the pipeline involves an elevation difference of about 56 feet over a horizontal distance of 140 feet, resulting in a slope inclination of 2.5H:1V. The proposed pipeline will be supported by “slope anchors” which are concrete blocks of certain size that are installed at a given spacing in transverse direction along the pipeline alignment. A geotechnical investigation report was prepared to provide design recommendations for site preparation, grading operations, and the proposed new pipeline anchor foundations. Client: Brown & Caldwell
Moulton Niguel Water District (MNWD) – Reservoir Management Systems (RMS) Replacement Phases IV and V, Orange County, CA (2022): Lead Geotechnical Engineer for conducting field investigation at eight reservoir sites, performing laboratory testing and engineering analyses, an d preparing a report presenting our findings, conclusions, and recommendations for the project. The reservoirs are in the cities of Aliso Viejo, Laguna Niguel, and Mission Viejo, Orange County, California. R ecommendations were provided for:
• Excavation stability and shoring requirements,
• Earthwork and compaction criteria,
• Potential seismic hazards,
• Site seismic design coefficients, and
• Foundation design parameters.

The project includes demolition of the existing On-Site Generation (OSG) systems and construction of new

12.5% bulk sodium hypochlorite and ammonia systems or new OSG systems. Client: Brown & Caldwell Therma South Davao Power Station, Aboitiz Power Co., Mindanao, Philippines (2012 -2013): Lead Geotechnical Engineer, developed analytical tools and estimated static and dynamic loads acting on a large coal dome supporting structure and conveyance tunnel. Developed subsurface profile and parameters for soil-structure interaction analysis for large-diameter intake and out-fall pipes. Performed site-response analysis.

AZ1 230kV Power Transmission Line, Pacific Gas and Electric Co.; San Francisco, California, (2011-2012):

Lead Geotechnical Engineer, performed soil-structure interaction analysis for submarine and land alternative routes for approximately 2.5 miles of 230kV transmission line in the San Francisco Bay area.

Segments of the transmission line subjected to excessive distortion due to liquefaction or landslide were specified.

Oakley Generating Station; Contra Costa Generating Station LLC; Oakley, California, (2011):

Geotechnical Engineer developed dynamic subsurface profile and seismic parameters. Performed site response analysis.

Bidjan Ghahreman, PHD, PE, GE Principal Engineer

Page 3 of 4 ends

Oakley Generating Station; Contra Costa Generating Station LLC; Oakley, California (2011):

Geotechnical Engineer developed dynamic subsurface profile and seismic parameters. Performed site response analysis, profile and design parameters for a water intake structure in Lake Granbury. Performed preliminary design of drilled piers to support this structure.

Mitsubishi Heavy Industries, Inc. (MHI), (2010): Geotechnical Engineer received training on the computer program ACS SASSI for soil-structure interaction analysis of seismic category I and II structures in nuclear power plants.

OTHER REPRESENTATIVE PROJECT EXPERIENCE
Port of Los Angeles (POLA), Los Angeles, CA (2018): Performed analysis of the mechanism and causes of excessive movements of a high, cement- treated cantilever sea wall (under litigation). Review of substantial volume of technical data on soil profile and parameters, tide and rainfall record, construction material and construction sequence record, in order to reproduce the measured movements.

Pedestrian Bridge, Oso Creek, Laguna Niguel CA, 2016 : Developed subsurface profile, and static and seismic design parameters. Provided Acceleration Response Spectrum (ARS) per Caltrans. Developed grading and foundation recommendations for pile foundations per Caltrans requirements. Estimated stresses induced in the concrete liner of the creek due to lateral movement of piles.

Windy Ridge Reservoir Access Road and Reservoir Site Investigations, City of Anaheim, Orange County, CA (2014 -2015): Consultant Engineer, performed static and seismic slope stability analyses for a proposed access road to the reservoir that included (rock & soil) cut and fill. Designed stabilization measures including tiebacks, stability caissons, and Mechanically Stabilized Earth (MSE) walls.

LADWP Headworks Reservoir Design , Los Angeles, CA (2014 -2015): Consulting Engineer in charge of evaluating seismic earth pressures acting on underground water storage facilities using finite element (FE) analysis and data from seismic centrifuge lab tests.

Populus Terminal Transmission Partners (PTT); Pacific Corp; Ogden, Utah ( 2009): Geotechnical Engineer designed large diameter drilled shafts for foundations of monopoles for a 135-mile long 345 kV transmission line. Inspected construction of drilled shafts averaging about 10 feet in diameter, with a handful reaching 30 feet in diameter.

Leucadia National Corporation; Lake Charles SNG; Lake Charles, Louisiana (2009): Lead Geotechnical Engineer devised geotechnical investigation plan for a new Synthesized Natural Gas (SNG) plant.

Developed soil profile & established soil engineering parameters. Designed a 2000-ft long river bulkhead.

JEA – Greenland Energy Center; Jacksonville, Florida (2008): Geotechnical Engineer supervised geotechnical investigation for a combined cycle power plant using exploratory borings, cone penetration tests (CPT), and dilatometer tests. Assigned lab tests on soil and rock specimens. Developed soil profile and established engineering soil parameters. Compiled geotechnical design report. Investigated applicability of deep dynamic compaction to improve foundation condition.

Lowman Power Plant AQC Additions; Alabama Electric Cooperative; Leroy, Alabama ( 2005 – 2008):

Geotechnical Engineer responsible for geotechnical investigation for the Air Quality Control System (AQCS) and investigation of nearby riverbank slope stability. Analyzed laboratory and field data. Directed high quality clay sampling for optimization of slope stability procedures. Evaluated requirements and applicability of different remedial measures for stabilization of slope. Evaluated post -construction riverbank movements and potential impact on the proposed AQCS. Prepared geotechnical data and design report, including data and foundation recommendations. Designed Augered Cast -In-Place (ACIP) piles and micropiles for support of the AQCS, and supervised construction of these foundation elements.

Bidjan Ghahreman, PHD, PE, GE Principal Engineer

Page 4 of 4 ends

Water Pollution Control Facility (WPCF), City of West Haven , Connecticut ( 2010): Geotechnical Engineer, supervised installation of test Continuous Flight Auger (CFA) piles. Reviewed piles load test results. Supervised installation of production CFA piles.

Pine Tree Wind Farm; Los Angeles Dep t. of Water & Power (LADWP), Los Angeles, C A ( 2005):

Geotechnical Engineer responsible for geotechnical investigation for a 120 MW, 80 towers wind farm.

Assigned rock lab tests & analyzed laboratory tests and field data. Estimated engineering properties of rock mass. Prepared geotechnical design report including foundation design parameters & recommendations.

Page 1 of 5 ends

ASHKAAN (ALEX) HUSHMAND, Ph.D., P.E. , GE

PROJECT MANAGER

PROFESSIONAL EXPERIENCE
Dr. Hushmand has more than eight years of experience in a variety of geotechnical and earthquake engineering projects related to public works infrastructure. Dr. Hushmand has construction (QA/QC) experience related to monitoring,
inspection, and field testing for soil density and moisture content (nuclear gauge & sand cone) of compacted fills for large grading projects; concrete and asphalt placement monitoring and field testing for public works and industrial projects; installation of geotextile and geogrid for stabilization of soft subgrade and for landfill and impoundment ponds liner and cover systems; monitoring of slot cut trenches and backfilling with soil- cement slurry to shore sensitive, historical structures during various environmental
remediation, demolition, and construction projects;
monitoring pile driving and installation of drilled pile s for bridge and seawall construction; settlement monitoring of deep fills for backfilling of aggregate mines; and noise and vibration monitoring in sensitive urban areas . His design experience includes static and seismic design of buried reinforced concrete reservoirs, shallow and deep foundations, pipelines, and retaining structures; 2-D and 3-D slope stability evaluations; and settlement analysis of aggregate mines deep silt tailings. He also has experimental experience in model and large scale testing of ground vibration and liquefaction, underground structures, and installation of instrumentation such as strain gauges, accelerometers, settlement monitoring plates, and pressure transducers.

RELEVANT PROJECT EXPERIENCE

EXAMPLE CQA/CQC PROJECTS
Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, Kern County, CA- HAI is providing engineering laboratory support and performing construction quality control (CQC) laboratory and field testing services for the project prime Contractor. HAI has established a laboratory facility at the Project site validated by the USACE to perform laboratory materials testing on soil samples and aggregate materials used for the dam concrete structures, and filters, drains and slope rock revetment for Phase II improvements of the existing earthfill Isabella dam. HAI additionally provides as - needed geotechnical engineering consulting support services during construction planned to extend from 2019 to 2022. Client: Flatiron, Dragados, Sukut Joint Venture (FDSJV, 2019-Present).

Construction Quality Assurance (CQA) Services for Phase 12 Liner and Leachate Collection and Removal System (LCRS), El Sobrante Landfill, Corona, 2019-2020. CQA Manager for construction quality assurance (CQA) services provided by Hushmand Associates, Inc. (HAI) during construction of the Cell 12 liner and LCRS . The El Sobrante Landfill is an active Class III municipal solid waste (MSW) landfill owned by Waste Management. It occupies a side canyon in the central portion of Temescal Canyon.

The Landfill has a permitted waste footprint of about 468 acres, and is operated in accordance with the permit requirements of California Department of Resources Recycling and Recovery (CalRecycle) , California Regional Water Quality Control Board (RWQCB), and South Coast Air Quality Management District (SCAQMD).

Registration
• Geotechnical Engineer/ California
#GE 3187
• Civil Engineer, California PE# C78504
• Civil Engineer, Hawaii PE No. 17716-C
• 40-Hour OSHA Trained, 29 CFR
1910.120 (e) (2)/8 CCR 5192.
• Radiation Safety and Use on Nuclear
Gauges Certificate

Education
• Ph.D. Civil Engineering, University of
Colorado, Boulder, 2016
• M.S. Civil Engineering, University of
California, Los Angeles (UCLA), 2009
• B.S. Civil Engineering, University of
California, Irvine (UCI), 2008
Y f E

Ashkaan Hushmand, PhD, PE Project Engineer

Page 2 of 5 ends

Cell 12 is approximately 20 acres. It is lined with a double -composite liner system comprised of soil and geosynthetic components. Project construction consists of the following major work items:
• Mass excavation and grading including Subgrade preparation; • Exposing the tie-in to the existing Phases 7B, 9A, and 11A liner systems; • Importing clay liner material, and compacted clay liner placement; • Geosynthetics (geomembranes, GCL, and geotextiles) installation; • Importing and placement of LCRS gravel materials; and • Placement of LCRS piping and soil Operations Layer.

Southern California Edison (SCE) Permanent Penstock Protection, Shakeflat Creek Crossing, Mammoth Pool Reservoir, Madera County, CA, 2018-2020. Project Geotechnical Engineer responsible for providing geotechnical design services and construction support services for design and construction of permanent protection of the existing penstock across Shakeflat Creek which was damaged during previous rainy and flood seasons. Scope of work included preparation of engineering geology and geotechnical engineering reports; review of plans and specifications; performing geologic mapping of excavations for replacement of unsuitable foundation materials; observation and documentation of excavation dewatering and subgrade preparation; construction of proposed reinforced concrete spillways, cutoff/seepage barrier walls; drainage system under and around the spillway, and in- situ and laboratory testing of backfill materials and reinforced concrete.

Former Pacific Gas & Electric (PG&E) San Luis Obispo Manufactured Gas Plant Site, San Luis Obispo, CA, 2017 -2018. Worked as Field Engineer/ CQC Manager on this project, which consisted of geotechnical related design and construction support for performing deep excavations near historical buildings and removal of contaminated soils. Dr. Hushmand was on- site for construction quality control and assurance. He was involved in construction monitoring during excavation, monitoring stability of a historical building during excavation, testing of backfill, monitoring installation of geo- fabric to stabilize subgrade before compaction, monitoring and sampling of soil- cement slurry during backfilling of excavations, and vibration monitoring. Some of the challenges were ensuring stability of older, historic buildings during excavation and stabilization of soft subgrade soils.

First St. Viaduct over Glendale Blvd. Bridge, Los Angeles, CA, 2018-2019. Project Engineer responsible for overseeing laboratory testing, construction quality assurance (CQA) for environmental monitoring during excavations, CIDH piles installation, shoring installation, backfilling and soil compaction, and noise and vibration monitoring of surrounding buildings. Additional duties included reviewing submittals and approving design changes.

The Residence Inn by Marriott, Goleta, CA, 2015-2017. Worked as Field Engineer on this project. This project involved geotechnical design and construction support for the Residence Inn by Marriott hotel. As Field Engineer was involved in construction monitoring and testing during all grading operations, monitoring of pile driving activities, monitoring of geotextile & geogrid placement for mitigating ground settlements, monitoring of settlement monuments, and noise and vibration monitoring. One of the main challenges was the soft and variable subsurface soils which made it difficult for pile driving activi ties.

Careful monitoring of pile driving activities was necessary to ensure the piles reached capacity and did not crack prematurely at the top.

Phase C2 Partial Final Closure, El Sobrante Landfill, Corona, CA, 2019-2020. CQA Manager during the construction of 10 acre Phase C2 Partial Final Closure at El Sobrante Landfill. The cover system is an evapotranspirative (ET) cover comprised of 12 -inch thick Foundation Layer and a 4- foot thick ET final cover layer. Based on the technical specifications and CQA plan, the maximum hydraulic conductivity of the ET final cover soil should not exceed 1 x 10-5 cm/sec.

Cells E5/E7 East and Cell E6/West Berm, Waimanalo Gulch Sanitary Landfill, Kapolei, HI, 2018 - 2019. CQA Manager during construction of ~3 acre CellE5/E7 and Cell E6/West Berm at Waimanalo Gulch Sanitary Landfill, primarily consisting of 1.6:1 to 2:1 slopes. The leachate collection and removal system (LCRS) consists of GCL, HDPE, geotextile, gravel, HDPE piping and operations layer.

Ashkaan Hushmand, PhD, PE Project Engineer

Page 3 of 5 ends

Phase C1 Partial Final Closure, El Sobrante Landfill, Corona, CA, 2018-2019. CQA Manager during the construction of 24.1 acre Phase C1 Partial Final Closure at El Sobrante Landfill. The cover system is an evapotranspirative (ET) cover comprised of 12-inch thick Foundation Layer and a 4-foot thick ET final cover layer. Based on the technical specifications and CQA plan, the maximum hydraulic conductivity of the ET final cover soil should not exceed 1 x 10-5 cm/sec.

Phase 11B Liner and LCRS, El Sobrante Landfill, Corona, CA, 2017. Assisted the CQA Manager during construction of the Phase 11B at the El Sobrante Landfill, Corona, CA. The 19.4- acre cell is lined with a double-composite liner system comprised of soil and geosynthetic components. The project bottom liner and LCRS consist of the following components (from bottom to top): 1) prepared subgrade, 2) 1-foot thick compacted clay liner 3) 40-mil double-sided textured HDPE geomembrane 4) GCL 5) 60-mil double- sided textured HDPE geomembrane 6) 11-oz/sy woven (cushion) geotextile 7) 9-inch thick LCRS drainage layer 8) 8 oz/sy non-woven (filter) geotextile and 9) 2-foot thick soil operations layer.

Water Service Replacements, Dana Point, CA – Project Engineer responsible for overseeing CQA for soils, aggregate, and asphalt concrete testing, and material inspection services during 87 water service replacements.

Soto Street Bridge Removal over Mission Road & Huntington Drive and Soto Street Realignment, Los Angeles, CA – Project Engineer responsible for providing geotechnical and environmental engineering support and recommendations during excavations and backfilling, soil disposal, and mitigation of the existing bridge foundations impact on road pavements.

North Atwater Non -Motorized Multimodal Bridge, Los Angeles, CA – Project Engineer responsible for noise and vibration m onitoring and backfilling s ervices during construction of the new multimodal bridge. HAI provided field measurements of noise and vibration at two locations during construction activities. Additionally, HAI observed and tested retaining wall backfilling operation and maintenance road construction along Los Angeles River.

Seismic Retrofit and Widening of Tampa Avenue Bridge and Winnetka Avenue Bridge Over Los Angeles River - Staff Engineer responsible for geotechnical observations during pile installation, and construction of abutment walls and foundations. HAI provided geotechnical engineering and soils testing services during construction of the proposed Tampa Avenue Bridge and Winnetka Avenue Bridge widening and rehabilitation projects over Los Angeles River in City of Los Angeles, California.

Geotechnical Investigation and Construction Monitoring for an Additional Inbound Scale (4th Scale) at El Sobrante Landfill Facility, Corona, CA – Project Engineer for a geotechnical investigation and construction quality assurance (CQA) services for design and construction of a reinforced concrete inbound scale (4
th Scale). The geotechnical investigation included field exploration, laboratory testing, interpretation of field and laboratory test data, engineering analysis, and preparation of a final report providing geotechnical engineering data and design recommendations for construction of the proposed additional inbound scale. Provided CQA services during subgrade preparation, backfilling and compaction, concrete and rebar placement, and field testing and sampling of concrete for construction of the scale.

EXAMPLE DESIGN PROJECTS
State Street Bridge Widening Project, City of Los Angeles, CA - Senior Staff Engineer responsible for performing Environmental Phase II Assessment study on the site subsurface soil conditions at State Street Bridge over SCRRA and Busway for environmental evaluation, and characterizing subsurface soil conditions. HAI provided environmental site investigation, and geotechnical laboratory testing services for the project.

Headworks Reservoir, Los Angeles Department of Water and Power (LADWP), Los Angeles, CA – As Senior Staff Engineer performed Geotechnical Centrifuge and Numerical Modeling to investigate lateral seismic earth pressures development on walls of underground -restrained water storage structures. The purpose of this experimental and analytical modeling was to investigate soil -structure interaction phenomenon and to understand the mechanism, configuration, and intensity of the lateral earth pressures Ashkaan Hushmand, PhD, PE Project Engineer

Page 4 of 5 ends

that develop on the walls of an underground structure restrained at the top and bottom during a seismic event; particularly rigid concrete water-storage structures. LADWP is constructing a new buried reservoir at the Headworks Spreading Grounds, a 43- acre site adjacent to Los Angeles River and between City of Burbank and Griffith Park, to bypass Silver Lake Reservoir. The proposed buried 110- MG Headworks Reservoir pro ject includes 40- foot high walls that will be buried and are restrained against rotational movement at bottom and top by the reservoir floor and roof, respectively. Understanding the mechanism of soil-structure interaction phenomenon and its effects on seismic -induced lateral earth pressures by performing physical and numerical modeling will be beneficial to this project and other similar future projects to support the structural and geotechnical design of underground structures.

Site 3 Landfill Cover Construction, Edwards Air Force Base, Lancaster, CA - Project Engineer for performing a geotechnical investigation to design the landfill cover, and providing construction quality assurance services during construction of the landfill cover. The landfill was in operation from the mid- 1960’s for waste disposal until 1976. It was estimated that approximately 526,000 cubic yards of household waste and construction debris was disposed at Site 3. The proposed landfill cover consisted of: 6-inch-thick layer of vegetative cover for native grass with a saturated hydraulic conductivity of 1x10 -2 cm/sec; and an
18-inch-thick evapo-transpiration (ET) cover layer with a saturated hydraulic conductivity of 1x10-4 cm/sec or less. HAI performed the laboratory testing to evaluate the physical characteristics and engineering properties of the preferred borrow materials and performed analyses required to provide geotechnical input for the design of the ET cover and its associated drainage control system during design phase in 2014 and 2019 to 2020. HAI is now providing CQA services during construction.

Pedestrian Bridge in Meadowbrook Park, San Bernardino, CA – Project Engineer responsible for design of driven pile foundations and other geotechnical recommendations for a pedestrian bridge. Some of site challenges were the predicted high intensity earthquake ground motions and subsequent seismically induced ground settlement due to densification of dry granular soils.

Los Angeles River Greenway Bike Path, Los Angeles, CA - Worked as Staff Engineer on this project.

The project comprised different segments of a bike path along the Los Angeles River. The bike path cut s through existing concrete levees and passes underneath several street bridges over the Los Angeles River.

One of the main concerns was the effect of the bike path on the existing bridge abutments. Dr. Hushmand was involved in geotechnical subsurface exploration along the bikeway alignment followed by detailed inspection and classification of the collected samples and assignment of laboratory testing. The engineering analyses consisted of seismic demand analysis, liquefaction potential and ground deformation evaluations, shallow and deep foundation design, static and dynamic earth pressures evaluation, and slope stability analysis.

Santiago Creek Bike Trail North, Hewes Street Culvert and Retaining Wall Design, Orange, CA - Worked as Staff Engineer on this project, responsible for design and construction of a culvert and a utility cover, and retaining walls along the Santiago Creek Bike Trail North and Hewes Street Segment in the City of Orange. HAI’s services included field exploration, laboratory testing of selected samples, engineering analysis to develop design and construction recommendations, which included site-specific seismic design parameters, liquefaction assessment, design recommendations for proposed 24” CIDH pile foundations, shallow foundations, retaining walls, and recommendations for anticipated construction activities.

Santiago Creek Bike Trail North and Collins Avenue Undercrossing, Orange, CA - Staff Engineer responsible for conducting geotechnical investigation to provide geotechnical recommendations for design of a bike path and undercrossing associated with the Collins Avenue segment of the Santiago Creek Bike Trail North project. HAI’s services included field exploration; laboratory testing of s oil s amples; and engineering analyses to develop design and construction recommendations including site-specific seismic design parameters and liquefaction assessment for a proposed undercrossing box culvert, shallow foundations, retaining walls, bike trail side slopes , pavement design, and recommendations for the anticipated construction activities.

Ramona Blvd. Street Resurfacing, El Monte, CA – Project Engineer responsible for providing flexible pavement design (rehabilitation and new sections), rigid pavement design (new sections for bus pads), and Ashkaan Hushmand, PhD, PE Project Engineer

Page 5 of 5 ends

percolation recommendations. A Falling Weight Deflectometer (FWD) field investigation method was used following the Caltrans CTM 356 test procedure to measure the deflection of the road surface and to calculate the structural capacity of the pavement section.

Pedley Road at Jurupa Road Improvements, Jurupa Valley, CA – Project Engineer responsible for providing flexible pavement design for widening (new sections) and intersection s (rehabilitation), design recommendations for new traffic signal poles foundations and a new retaining wall for retention basin, and site soils percolation properties evaluation.

Remedial Action at Former Corona Manufactured Gas Plant, Corona, CA – Project Engineer responsible for providing recommendations for sloped excavations and excavations (up to 14 feet deep) using slot cut trenching method and shoring. Some of the challenges were designing the excavations for high surcharge loads from adjacent railroad tracks and ensuring stability of adjacent electrical substation.

Preliminary Geotechnical Evaluation Report for Reclamation of the Former Azusa Landfill Zone V, Azusa, CA – The main purpose of this project was to evaluate the settlement of a saturated ~25 feet thick silt tailings layer at the bottom of an aggregate pit due to staged placement of 240 to 300 feet of compacted fill during 35+ years. The project consisted of field investigation, laboratory testing, developing soil constitutive model parameters for numerical modeling using PLAXIS finite element software to calculate the consolidation settlement of the silt tailings layer.

Geotechnical Investigation for Soil Stabilization Recommendations at Rio San Gabriel Park, Downey, CA – The main purpose of this project was to provide recommendations regarding potential settlement and soil stabilization for future construction in a park overlaying an old landfill. The approximately 25 feet thick landfill operated during the late 1940’s and ceased operation around 1955 followed by building a park on top of it. The project consisted of geophysical survey, geotechnical borings, laboratory te sting, settlement evaluation, and providing soil stabilization recommendations.

Los Angeles Department of Water and Power (LADWP) Trunk Line, South Tunnel, Los Angeles, CA Assisted the Project Engineer as a Field and Staff Engineer to write the project Work Plan and Health and Safety Plan; to obtain encroachment permits; to conduct literature research and geology reconnaissance; to interprete aerial photographs; to drill and log five continuously cored boreholes; to collect and describe core and undisturbed soil samples; to conduct permeability testing (packer testing); and to prepar e the geotechnical investigation report for the replacement of a 60-inch water transmission pipeline on the north side of the Santa Monica Mountains extending northward from Coldwater Canyon to the north portal of the Franklin Tunnel.

Alton Parkway Gap Closure, City of Lake Forest, CA – Senior Staff Engineer responsible for providing geotechnical consulting services for closure of Alton Parkway in the City of Lake Forest between Commercentre Drive and Town Centre Drive, a length of approximately 4,800 linear feet. HAI provided field investigation, laboratory testing, geotechnical engineering evaluation and analysis, geotechnical observation and testing services during construction.

Page 1 of 3 ends

DONALD A TERRES, CEG, PG
P rofessional Geologist & Engineering Geologist
Geotechnical & Environmental Geologist

Registration
• Certified Engineering Geologist, California, CEG 1362 • Professional Geologist, California, PG 4349
• Former City of Los Angeles Deputy Methane Inspector – Lic. No. P031442 Education
• Master of Arts, Geological Science, 1984, University of California, Santa Barbara, California • Bachelor of Sciences, Geological Science, 1981, Principia College, Elsah, Illinois • Summer Field Camp, 1980, Indiana University, Whitehall, Montana Professional Organizations & Academic Credentials: Member Southern California Geological Society Year of Experience:
• Over 40 Years
Mr. Terres’ over 40-year career has been conducted throughout California and has included a wide variety of projects types including multiple dams, institutional, commercial, industrial, public works, residential, and other projects. While Mr. Terres’ primary focus has been as a geotechnical consultant he has also experience as an Environmental Geologist. In 2013 Mr. Terres was the interim Geotechnical Reviewer for all projects within Orange County, California. He is a professional Geologist and Certifie d Engineering Geologist in the State of California and was a former Deputy Methane Inspector for the City of Los Angeles.

Mr. Terres has extensive experience in consulting related to transmission lines, pipelines, storm drains and other linear construction projects throughout the desert and coastal regions of Southern California.

Recently he has consulted for the construction of miles of underground pipelines and Storm drains in the Yucca Valley, Palm Springs, Indio, Niland and other desert communities. He has conducted geotechnical studies related to transmission line relocation and/or in Victorville, Bakersfield and related to other large community development projects.

RELEVANT PROJECT EXPERIENCE
USACE Lake Isabella Dam Replacement Project (2018-2023) - Geologist responsible for installation of two dewatering systems for two dams during project construction. The dewatering systems included both dewatering wells and sumps placed at strategic locations. The Project also included installation and monitoring of 15 piezometers standpipes and 6 clusters of vibrating wire piezometers. Slope stability analysis was conducted for the spillway and for many temporary slopes. Mr. Terres provided extensive analysis of the quarry for determination of rock quality and delivery of proper rock products.

Calaveras Dam Replacement Project (Completed in 2019) - Geotechnical Services provided included temporary slope stability analysis, quarry evaluation, asbestos monitoring, and other geotechnical services during construction of this dam in northern California. In the early phases of construction, Mr.

Terres’ team identified an unknown landslide that could have impacted the project safety if not identified.

Over 150 million dollars of change orders issued due to unknown landslide.

LADWP Owens Lake Piezometer Installation and Hydraulic Testing, Owens Valley, Inyo County, CA - Field observation and testing services were provided by HAI to LADWP during piezometer well installation and testing around the perimeter of Owens Lake in the Owens Valley on the eastern side of the Sierra Nevada Donald A Terres, CEG, PG Engineering Geologist

Page 2 of 3 ends

Mountains in Inyo County, California. The project consisted of performing site reconnaissance, installing nine (9) piezometer clusters at locations proposed by LADWP, logging and collecting samples from each borehole, laboratory testing of the material collected from the boreholes, developing wells, and hydraulic conductivity testing. The piezometer installation, construction, and development activities were performed in April 2015. The hydraulic testing activities at the piezometers were performed in April and May 2015. The piezometer boring and hydraulic test data obtained by HAI provided a limited perspective of the overall site hydrogeology. There are clearly differences in aquifer conditions across the site related to the overall sedimentology and depth of basement rock. This data was used by LADWP in an integrated approach to fully interpret the data.

Upper Chiquita Reservoir, Santa Margarita, Orange County, CA - Installation and initial monitoring of 16 piezometers surrounding the newly constructed covered reservoir – Geologist responsible for logging and supervision of installation of Piezometers to depths over 100 feet. Evaluation of temporary stability related to installation of deep outlet works. The Upper Chiquita Reservoir is located on the western slope of Chiquita Canyon, just north of the intersection of Oso Par kway and Los Patrones Parkway.

The 244-million gallon Upper Chiquita Reservoir is the largest domestic water reservoir built in south Orange County in nearly 45 years.

Lomas San Juan Parcels C & D, San Juan Capistrano, CA - Responsible for installation, monitoring and interpretation of collected data for 40 dewatering wells and 10 piezometers that were active over a several year time frame. The dewatering wells were for the purpose of inducing settlement in the underlying alluvium.

Terramor Pump station, Corona, California - included excavation below groundwater along Temescal creek and required dewatering and shoring to install the sub-terranean pumping structure. This was part of the larger Terramor Project that also included dewatering and construction related to placement of two bridge structures across the environmentally sensitive Temescal Creek area.

Perris Reservoir, Riverside County, California - Mr. Terres provided expert opinions regarding the quality of the rock quarry, the temporary stability related to a haul road and guidance on proper testing of aggregates placed during the embankment process.

City of Huntington Beach Reservoir Project, CA - The Springdale underground reservoir was constructed to elevations below the adjacent groundwater levels. Geotechnical issues included dewatering of the site during the construction phase and he suitability of the soils to support the proposed structure s. Close coordination with multiple city agencies was necessary. Unique solutions were required during construction to remediate the geotechnical conditions.

Repair of two 5 million gallon underground reservoirs for the City of Laguna Beach - Both reservoirs were drained and evaluated for settlement and adjacent slope stability issues. Subsurface investigation methods required avoidance of existing underground utilities and structures. Remediation included grouting to mitigate slope creep and settlement concerns. Timing of geotechnical investigation and quick response times were critical to the success of this project.

Starlight Reservoir, Whittier - Geotechnical investigation of existing and proposed reservoir site in steep hillside terrain. Directed field investigation which encountered existing landslide and similar slope stability issues. Defined portions of site that were suitable for above ground and/or underground water reservoirs.

MWD Diemer Pipeline Crossing, Orange, CA - Geotechnical investigation to determine setbacks for large residential project adjacent to this major pipeline feature in Orange County. Grading observation and testing to verify conditions and assure the safety of the pipeline.

Donald A Terres, CEG, PG Engineering Geologist

Page 3 of 3 ends

Sierra Bella Pipeline Crossing, Corona, CA - Geotechnical investigation for existing large diameter MWD pipeline. Appropriate setbacks had to be determined so as not to induce settlement of the pipeline.

Construction of two Municipal Emergency Water Wells, City of Palo Alto, CA - These water wells were constructed to depths of 460 and 540 feet and included 18 inch diameter well casing that were capable of each producing over 1000 gallons per minute.

Solana Ridge Reservoir Site, Las Vegas, Nevada - This project included evaluation for rippability, and an active Fault near the proposed reservoir site. Rippability was characterized for proposed cuts of over 100 feet in depth in granitic -like terrain. Long fault trenches were excavated to determine the nature and location of faults. Fault zones that were previously called active were downgraded to potentially active.

Design and Construction Phases of Twin City of San Juan Reservoirs - Construction of the above ground reservoirs included construction of an access road and installation of the utilities necessary for operation of the twin reservoir site. Geotechnical hazards that were remediated included several landslides and slope stability issues, and stabilization of soft alluvial soils. Biologically sensitive wetlands were avoided and enhanced as part of the projects scope of work.

Monarch Beach Development, Dana Point, CA - Dewatering associated with excavations 40 feet below sea level. Excavations were started along the beach front and the excavation remained dewater for several month period during excavations.

Three Forks Dam , Hesperia – Provided geologic mapping of proposed wing wall structure and existing dam structure. Detailed literature review. Proposed revised interpretation of geologic conditions including evaluation of potentially active faulting. Conducted seismic reflection surveys to better define fault locations and subsequent backhoe trenching to confirm findings.

Development of two Reservoir Sites in the City of Orange, CA - One of the above ground reservoir sites was along an unstable ridgeline and required realignment of the access road to provide more reliable servicing to the facility. The second reservoir was built over engineered fill that was 50 feet in depth.

Selective grading and above standard compaction criteria was required to provi de a uniform and stable fill column that was capable of supporting this above ground structure. As part of this work the existing nearby “Diemer” 72-inch diameter water main was evaluated to assure that settlement was not a concern.

Page 1 of 5 ends

CHRISTOPHER J. SEXTON, P.G . , C.E.G.

ASSOCIATE SENIOR GEOLOGIST

Registration
• Professional Geologist, California, #4612
• Registered Geologist, Idaho, #681
• Certified Engineering Geologist, California, #1441
• Certified Engineering Geologist, Oregon, #1148
• Member, Association of Engineering Geologists
Education
• M. S., Geological Sciences, California State University, Los Angeles, 1990 • B. S., Geological Sciences, California State University, Northridge, 1983 Year of Experience:
• 38 Years
Mr. Sexton has over 38 years of experience providing engineering geology services in diverse geologic and environmental settings from Santa Monica and San Gabriel Mountains to the California Desert, and the California Coastline from San Luis Obispo to San Clemente. His expertise includes geological site characterization, land review, technical/peer review for municipalities, earthquake damage assessments, forensics, geotechnical construction monitoring, instrumentation, fault studies, and evaluation and remediation of landslides and other geologic hazards. These studies included drilling and trenching operations using many different types of full-sized and limited access drilling rigs and sampling equipment.

Mr. Sexton has extensive experience producing detailed logs of fault trenches, rock-core and drill cuttings, and downhole observations in hundreds of bucket auger borings to depths as great as 160 feet. Project environments range from beachfronts and level sites to difficult-access hillside areas.

Over the last 20 years, Mr. Sexton has provided consulting engineering geology services to over 40 respected engineers, geologists and developers throughout southern California. His studies have ranged from “due diligence” reviews in support of purchase decisions to detailed geologic site characterization, slope instrumentation and geologic review for municipalities. Mr. Sexton has provided technical peer- review of hundreds of proj ects ranging from simple residential additions to large tracts with over 1000 homes situated in complex terrain including active faults, deep landslides, and combinations of collapsible, expansive and liquefiable soils.

RELEVANT PROJECT EXPERIENCE
MWD Sepulveda Feeder PCCP Rehabilitation & Pump Stations in Pacific Palisades & Venice Beach, CA (2018 – ongoing) – Lead Engineering Geologist performed Geological Study of this project. The 42 -mile long Sepulveda Feeder conveys treated water from the Jensen Plant in Granada Hills to an interconnection with the Second Lower Feeder in Torrance. Approximately 35 miles of the feeder comprises PCCP with diameters ranging from 150 inches at Jensen Plant to 84 inches at the interconnection with the Second Lower Feeder. The remainder of the line is constructed of welded steel pipe with diameters ranging from 94 inches to 97 inches. Additionally, HAI is currently providing geotechnical engineering services for design and construction of a new 13-MG water tank and two major pump stations for MWD in Pacific Palisades and Venice Beach.

MED Casa Loma Siphon No. 1 Fault Crossing Project, Casa Loma, CA (2018 -2023) – Lead Engineering Geologist performed Geological Study for the analysis and design of the Colorado River Aquaduct Casa Christopher J. Sexton, P.G., C.E.G. Associate Senior Geologist

Page 2 of 5 ends

Loma Siphon Barrel No. 1 (CLS- B1) crossing active Casa Loma Fault Segment, part of the regional San Jacinto Fault Zone System. Conducted consolidated -isot ropically-und rained triaxial (Tx -CIU) and Consolidated-isot
ropically-draine
d triaxial (Tx -CID) tests to evaluate soil parameters for constitutive models used in finite element modeling of pipeline fault crossing. Soil-structure interaction effects on the ERDIP (earthquake resistant ductile iron pipe) line due to lateral fault displacements were modeled; effect of using specially manufactured backfill materials on pipe stresses was studied. 2019, Shakeflat Creek Crossing, Mammoth Pool, Sierra National Forest, Madera County, California (2018-19) Phases I and II: Certified Engineering Geologist leading all geological evaluations during project design and construction phases. Phase I (2018): initial geologic reconnaissance, mapping of existing damage penstock protection across Shakeflat Creek during previous flood s easons, followed by geotechnical engineering support during design of repair measures by TetraTech and SCE, and preparation of preliminary engineering geology and geotechnical engineering reports. Phase II (2018 -2019):

Construction Quality Assurance (CQA), geotechnical monitoring, in-situ and laboratory testing during 2018 and 2019 summer seasons. Included review of plans and specifications; performing geologic mapping of excavations for replacement of unsuitable foundation materials; observation and docume ntation of excavation dewatering and subgrade preparation; construction of proposed reinforced concrete spillways, cutoff/seepage barrier walls; and drainage system under and around the spillway. In -situ and laboratory testing of backfill materials. Client: SCE Generation.

2015, Kaweah #1 Flowline 7-2 - Geotechnical field investigation and laboratory testing, and provided geotechnical grading and foundation design recommendations for mitigation options to repair the eroded slope areas located at Flowline 7-2, East Fork Kaweah River, Kaweah Powerhouse No. 1 in Tulare County, California. The project site is located on the south side of Mineral King Road, approximately 3 miles east of Highway 198 at an elevation of about 2,546 feet. The flowline section at this location is constructed of an approximately 50 - inch diameter semi -circular steel flume supported on a treated lumber truss structure

2015, Kaweah #2 Canal 10 -2 - Geotechnical field investigation, laboratory testing, and engineering analyses, and provided geotechnical grading and foundation design recommendations to mitigate creeping and erosion of the canal support soils located at Canal 10-1/2, Middle Fork Kaweah River, Kaweah Powerhouse No. 2 in Tulare County, California. The project site is located at approximately 6,000 feet upstream from the forebay of Kaweah Powerhouse No. 2. Typical flowline structure at this location are a trapezoidal shaped concrete lined ditch and a semi -circular steel flume supported on treated lumbers.

The top/bottom widths and depth of the concrete lined canal are about 13/4 feet and 5 feet, respectively.

The diameter of the semi-circle steel flume is approximately 50 inches.

2014, June Lake Agnew Dam Tram Improvement - Reconnaissance-level engineering geology and geotechnical engineering review of the light rail track between the Southern California Edison’s Rush Creek Powerhouse and Agnew Dam. The rail track is approximately one mile long and is used to support a funicular tram (Agnew Tram) for carrying equipment, materials, and personnel between the powerhouse and the dam. Our scope of services for the project consisted of the following tasks:
• Review of pertinent, available published geological reports; • Review of aerial imagery of the site;
• Two days of reconnaissance of field conditions in the immediate vicinity of the alignment; • Interviews with SCE personnel who have been operating the tram for up to thirty years; • Reconnaissance-level assessment of prominent joint surfaces and other structural features at critical locations along the alignment;
Christopher J. Sexton, P.G., C.E.G. Associate Senior Geologist

Page 3 of 5 ends

• Reconnaissance-level assessment of the overall conditions of the track bed and immediately surrounding areas; and
• Preparation of a series of schematic maps to illustrate geologic conditions in the immediate vicinity of the alignment.

OTHER PROJECT EXPERIENCE
 Served as principle geologic reviewer on hundreds of projects for the Cities of Simi Valley, Moorpark, Agoura Hills, Hidden Hills, Malibu, Calabasas, Camarillo, Palmdale, Santa Clarita and others. Tasks included detailed review of fault investigation studies for large residential and commercial developments in the Simi -Santa Rosa, Camarillo, San Gabriel and San Andreas Fault zones. Primary editor in the development of Guidelines for the Preparation of Geotechnica l Reports for the City of Palmdale, California. Provided testimony in 2006 to the State Mining and Geology Board during challenges to the current interpretation of the Alquist -Priolo Special Studies Act, and requests for a working group to re-visit requirements of the Act.
 Provided reconnaissance of engineering geology constraints for the Mountains Recreation & Conservation Authority (MRCA), involved in the development of facilities proposed at four coastal community parks in the geologically complex Malibu area of southern California.  Provided geologic investigation and observation and mapping during grading to excavate cell expansions at the Calabasas and Sunshine Canyon Landfills. Investigations included detailed downhole logging of bucket-auger borings to depths of 80 feet. Identified critical geologic features in cell floors and in cut-slopes that extended to heights over 400 feet.

 Disinfection CT Credit Improvements Project at the Earl Schmidt Filtration Plant, Castaic, CA. HAI conducted a geotechnical investigation to provide recommendations to enhance the disinfection system at the facility and improve disinfection CT credit to meet all regulatory requirements for all operational conditions. The project consists of design and construction of a chlorine contact basin supported on a reinforced concrete mat foundation, two (2) 54-inch diameter steel pipes that connect the chlorine contact basin with the existing piping system, and appurtenant structures. Client: RBF / Castaic Lake Water Agency (CLWA), 2014.

 Provided logging and supervised installation of inclinometers to monitor potential movements in large landslides being undercut by grading for residential developments on property adjacent to a landfill access road in San Juan Capistrano.

 Project Geologist for several projects completed at the Southern California Gas Company at the Aliso Canyon Facility at the north edge of the San Fernando Valley. Projects included aggressive grading repair of access road failure that damaged and continue d to threaten well -head facilities, and geologic/fault investigation of a proposed pad for new compressor facilities.

 Provided second -party review for the Triunfo Sanitation District of preliminary feasibility level assessments of five alternative sites proposed for relocating a municipal water tank off of a large landslide (2005).

 On location for over four months east of Glamis, California to provide field assistance during groundwater characterization study in support of the proposed Mesquite Landfill. Completed detailed field mapping, well installation, and surface logging of nearly 4000 feet of rock core in 12 exploratory holes that extended to depths of over 500 feet in sedimentary and complexly deformed Christopher J. Sexton, P.G., C.E.G. Associate Senior Geologist

Page 4 of 5 ends

metamorphic terrain. Provided input during interpretation of geophysical logging and critical review of cross sections during the final stages of report preparation.

 Supervised drilling and installation of inclinometers as part of a detailed investigation of a landslide covering about 10 acres in Bel Air Estates, California. The landslide affects approximately 15 estate properties and a Los Angeles Department of Water and Power water line. Provided detailed geologic logging of hollow -stem auger and rock -core holes that extended to depths of about 90 feet.

Supervised installation of inclinometer casings and groundwater monitoring wells. The project was completed by Geomatrix Consultants and AMEC for the Los Angeles Department of Water and Power (2006–2013).

 Provided detailed logs of cleanout excavations to characterize shallow stratigraphy exposed during construction of the Los Angeles Department of Water and Power Headworks Eastern Reservoir.

Logged sonic borings for the Headworks Western Reservoir.

The combined capacity of the two Headworks reservoirs will be approximately one -hundred, million gallons. Project was completed by AMEC for the Los Angeles Department of Water and Power (2011 and 2013).

 Provided field exploration in support of evaluating the feasibility of various cover designs for the Los Angeles Department of Water and Power Stone Canyon Reservoir, located above Bel Air in the Santa Monica Mountains north of Los Angeles. Provided detailed surface logging of approximately 800 feet of coreholes that extended to depths up to about 100 feet, detailed logging of shallow trenches and surface support during downhole examination of large diameter borings to depths of about 115 feet.

Participated in downhole geophysics with Optical Televiewer, and installed and developed water-level monitoring wells in coreholes; including installation of vibrating wire piezometers. Project evaluated overall bedrock struct ure and groundwater conditions, helped define a complex unconformable contact between the Topanga Formation and Modelo Formation that extends beneath the existing dam, and developed subsurface definition of landslides that cover up to approximately 15 acre s.

Project was completed by AMEC for the Los Angeles Department of Water and Power (2010-2013).

 Provided field supervision and logging of trenches and rotary wash borings in support of a geotechnical study to provide recommendations for rehabilitation of gas pipeline foundations in an environmentally sensitive area of Santa Barbara County. Project was completed by Globus Engineering, Inc. for the Southern California Gas Company (2012).

 Participated in core logging, geophysical logging and geologic interpretation for the Los Angeles Department of Water and Power, Silver Lake Bypass Tunnel Project. Logged two core holes and assisted in developing cross sections in support of geotechnical evaluation of large diameter access shafts proposed to extend to depths of approximately 90 feet. Project was completed by AMEC for the Los Angeles Department of Water and Power (2011).

 Completed fault rupture hazard study as part of a package of feasibility assessments for a major freeway interchange and surrounding developments proposed in the City of Camarillo, California.

High groundwater and unconsolidated materials precluded conventional trenching. Instead, 131 CPT soundings totaling a lineal footage of nearly 7500 feet were interpreted to identify potential fault offsets in shallow stratigraphy. Project was completed by Bing Yen and Associates, Inc. for the City of Camarillo (2004).

Christopher J. Sexton, P.G., C.E.G. Associate Senior Geologist

Page 5 of 5 ends

 Supervised field exploration, radiocarbon dating, analysis, and report preparation for a fault study in support of a 120 -acre, major mall development in the City of Simi Valley, California. Coordinated excavation and detailed logging of approximately 7500 lineal feet of shallow fault trenches, two alluvial trenches that extended to depths up to 50 feet and involved earth quantities of about 300,000 yd
3, as well as hollow -stemmed and bucket-auger borings. Project was completed by Bing Yen and Associates, Inc. for the City of Simi Valley (2002).

 Provided field supervision and downhole geologic logging to depths exceeding 120 feet to assess the mechanism and cause of failure where a landslide collapsed 600 feet of a major roadway at the southwest corner of the Palos Verdes Peninsula, California (White Point). Project was completed by Shannon and Wilson for the City of Los Angeles (2011-2012).

 Project Geologist responsible for investigation and construction monitoring of a large landslide repair completed in complex geologic terrain along Valdez Road in Calabasas, California. The landslide covered an area of about 2 acres and impacted three homes and a public road that provided access to 13 residential properties. Repair was completed under a grant from FEMA and included nearly complete removal and export of the landslide debris to install a shear key above the affected residences, installation of an extensive subdrain and new stormdrain system, and reconstruction of the public road.

Page 1 of 3 ends

BALA JAYAPRAKAS, M.S., P. E.

SENIOR PROJECT ENGINEER

Registration
• Professional Engineer, Civil, CA No. 94578
• Professional Engineer, Civil, OK No. 30644
• ASCE Member 000011852909
Education
• M.S., Civil Engineering,
University of Nevada, Reno, 2016
• B.S., Civil Engineering, University of Peradeniya, Sri Lanka, 2012 Year of Experience:
• 8+ Years
Mr. Jayaprakas received his M aster’s degree in Civil & Environmental Engineering from University of Nevada, Reno (UNR) and his Bachelor’s degree in Civil Engineering from University of Peradeniya, Sri Lanka. He has more than 8 years of experience in geotechnical engineering, pavement engineering and construction quality assurance.

He has been involved in field investigations, forensic geotechnical engineering, liquefaction analysis, and analysis of field and laboratory data to characterize subsurface soil layering and properties for use in engineering analyses to develop geotechnical design parameters for various projects . Mr. Jayaprakas provides Quality Management for HAI’s Geotechnical and Material Testing Laboratory to maintain the facility accreditations , AASHTO Materials Reference Laboratory (AMRL) and Cement and Concrete Reference Laboratory (CCRL).

RELEVANT PROJECT EXPERIENCE
Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, Kern County, CA- Lead Laboratory and Field Engineer responsible for providing engineering laboratory support and performing construction quality control (CQC) laboratory and field testing services for the project prime Contractor. HAI has established a laboratory facility at the Project site validated by the USACE to perform laboratory materials testing on soil samples and aggregate materials used for the dam concrete structures, and filters, drains and slope rock revetment for Phase II improvements of the existing earthfill Isabella dam. HAI additionally provides as -needed geotechnical engineering consulting support services during construction planned to extend from 2019 to 2023. Client: Flatiron, Dragados, Sukut Joint Venture (FDSJV, 2019-July 2023).

Casa Loma Siphon No. 1 Fault Crossing Project, San Jacinto, CA – Senior Staff Engineer responsible for providing geotechnical design support services for the analysis and design of the Colorado River Aquaduct Casa Loma Siphon Barrel No. 1 (CLS -B1) which crosses the Casa Loma Fault. Scope of work includes geotechnical investigatain, geophysical testing, comprehensive laboratory testing and parameters for finite element analyses. Client: Carollo Engineers, 2018-2023.

Moulton Niguel Water District (MNWD) Plant 3A, Mission Viejo, CA - Geotechnical Distress Investigation for Settlement Mitigation – Senior Staff Engineer responsible for field investigation to evaluate Bala Jayaprakas, M.S., P.E. Senior Project Engineer

Page 2 of 3 ends

subsurface soil conditions and evaluate potential cause(s) of ground surface settlements at Plant 3A and develop potential mitigation (remedial) measures to stop or minimize ground movement impact on the Plant. Client:MNWD, 2019-2023.

Southern California Edison (SCE) Substations, Transmission Lines, Hydroelectric Facilities, Central and Southern California - Senior Staff Engineer in charge of communicating with project managers from prime contractors (A/E firms such as HDR, Arcadis, and Black & Veatch) and SCE to prepare scope of work and fee for various task orders, submit safety forms, schedule field and laboratory testing staff, and manage quality assurance (QA) and performance of HAI’s technical staff for the SCE projects. HAI conducts geotechnical field exploration, laboratory testing , and field observation and testing services for construction of new and upgrade/retrofit of existing electrical substations, transmission lines/towers, and water canals and levees for hydroelectric facilities in Sierra Nevada Mountains (Mammoth Lake, June Lake Loop, Bishop, and Sequoia areas). The scope of work comprises coordination of SCE project personnel for field investigation, drilling borings , logging exploratory borings, collecting soil samples for geotechnical and environmental laboratory testing, preparing borehole logs, conducting geotechnical laboratory testing, coordination with e nvironmental laboratories for laboratory testing, performing construction quality assurance (inspection and testing) services, and preparing a final report presenting results of our testing and engineering analyses. Client:SCE; HDR, Arcadis, Black & Veatch, 2019-ongoing.

Bonita Canyon Recycled Water Zone D To B Pressure Reducing Station Supply Line Replacement Project, Irvine, Orange County, California - Senior Staff Engineer responsible for geotechnical investigation and preparation of design report for replacing a 12 -inch recycled water line within steel casing that supplies Zone D Recycled Water (RW) to Zone B system via the Bonita Canyon Zone D to B Pressure Reducing Station (PRS) in Irvine, California. This pipe is owned and operated by Irvine Ranch Water District (IRWD). The replacement will include abandonment of the existing supply line and installation of approximately 135 linear feet of replacement 12-inch diameter ductile iron pipeline in a new alignment.

Client: Michael Baker International, 2019.
2016 – 2018 Staff Engineer (Burgess Engineering and Testing, Moore, OK) Staff Engineer responsible for writing geotechnical investigation reports for the supervising Professional Engineer to review; Analyze and compile test data for use in Geotechnical reports; Perform geotechnical engineering investigations; Perform on -site i nspection on construction of deep foundation; Perform pavement designs using AASHTOWare Pavement ME Design software; Perform non -destructive testing on pavements: Falling Weight Deflectometer (FWD) and Ground penetration radar (GPR); Calculate quantities and estimate cost for construction materials testing based on the design sheets. Involved in Geotechnical and Material Testing Laboratory Quality Management to maintain the facility accreditations, AASHTO Materials Reference Laboratory (AMRL) and Cement and Concrete Reference Laboratory (CCRL).

Responsible for Quality Assurance (QA)/Quality Control (QC) review and reporting to top management.

The Curve Complex, Moore, OK – Staff Engineer responsible for geotechnical investigation and calculate potential vertical movement of the expansive soils, soil parameters for post tension concrete slab design, and lateral earth pressure coefficient for designing retaining walls. And performed pavement design for given traffic data. Client: Belmont Development, OKC, OK Roman Nose Trail Phase 4, Watonga, OK – Staff Engineer responsible for geotechnical investigation.

Scope of work includes calculate bearing capacity and California bearing ratio (CBR) of the existing soil from the dynamic cone penetration test results, design pedestrian and bicycle trail. Client: LandPlan Consultants, INC, Tulsa, OK
Bala Jayaprakas, M.S., P.E. Senior Project Engineer

Page 3 of 3 ends

Downdraft compressor facility in Elmore City, Garvin County, OK Staff Engineer responsible for geotechnical investigation and calculate soil parameters to design helical piers. Client: Intensity Midstream LLC, OKC, OK

Further notable projects include:
o Cimarron County Courthouse Improvements and Jail Project, Boise City, OK , Client:

ARC Architecture, LLC, Norman, OK
o Lindsay water treatment p lant improvements, Lindsay, OK Client: City of Lindsay, Lindsay, OK
o FAA Mobile Power System, Oklahoma City, OK Client: Grossman & Keith Engineering,

OKC, OK
o Soccer Facility, Oklahoma City, OK Client: Design Build Service, LLC, OKC, OK o Serenity Park II Apartments, Ardmore, OK Client: Desert Ridge Investments, INC, Salt Lake City, UT
o Baseball field improvements at University of Central Oklahoma, Edmond, OK Client:

University of Central Oklahoma, Edmond, OK
o Performing and Fine Arts building for Madill Public Schools, Madill, OK Client: Madill Public Schools, OK
o Tornado safe room at Whittier elementary school, Lawton, OK Client: Lawton Public Schools, Lawton, OK
o Sally Port Addition to Can adian County Jail, El Reno, OK Client: Canadian County Commissioners Office, El Reno, OK
o New field house for Waynoka Public Schools, Waynoka, OK Client: Waynoka Public Schools, Waynoka, OK
o New Upper Elementary School for Perkins Try on Public Schools, Perkins, OK Client:

Perkins Tryon Public Schools, Perkins, OK
o Office and warehouse at Hwy 66 and Radio Road, El Reno, OK Client: DOUD BTS, Golden, CO
o Orchard Plaza Retail Center, Moore, Oklahoma Client: Giau LLC, Westminster, CA o Superior Silica Sands Facilities, Dover, OK Client: Trinity Consultants, OKC, OK o Hutchinson Oil C-Store at Park and Tamarack, Altus, OK Client: Joe D.Hall GC, LLC, Elk City, OK

Page 1 of 6 ends

MICHAEL A. BAEZ

STAFF GEOLOGIST/ FIELD INSPECTOR

PROFESSIONAL EXPERIENCE

Certification
• 40-Hour OSHA Trained, 29 CFR 1910.120 (e)(2)/8 CCR 5192 • Radiation Safety and Use of Nuclear Gages
• ACI Concrete Field-Testing Technician Grade 1
• ICC Soils Special Inspector International Code Council • ACI Concrete Laboratory Testing Technician- Level 1
• Radiation Officer Class (RSO)
Education
• Bachelor of Science (B.S.) in Geology, California State University, Fullerton, Fullerton, California, 2014

Mr. Baez has more than eight years of experience in field Construction Quality Assurance (CQA) inspection and testing services for construction of shallow and deep foundations including installation of driven and drilled piles and tiebacks for bridges and buildings, CQA for installation of shoring, conducting bulk density and bulk gradation te sts as well field concrete testing and sampling, subsurface drilling and CPT explorations as part of geotechnical investigations for site characterization, and noise and vibration monitoring for sensitive construction projects . Mr. Baez has acted as HAI’s lead construction quality assurance moni tor and inspector working on a variety of construction and geotechnical engineering projects involving mass grading activities, and foundation preparation and installation. He also has extensive experience in laboratory testing for soil and concrete. Mr. Baez’s experience in field inspection and testing as well as laboratory testing has provided him with exceptional in-depth understanding of soil behavior and foundation design and construction.

PROJECT EXPERIENCE

Marathon Refinery Civil Construction Project (LASR). Soil Inspector for the LASR project for the Carson, Wilmington, and Sulfur Replacement Plant. Inspector for the installation of CIDH piles for foundations of various structures including buildings, tanks, and transmission lines throughout the three refineries, as well as the installation of vibratory piles and soldier piles for shoring and safety. Also performed density tests on grading projects and inspected various spread footings and Mat foundations throughout the three refineries and worked as the soil inspector for the project Geotechnical Engineer. Also conducted ACI field testing technician taking concrete samples for various concrete pours throughout the three refineries. 2023- Ongoing.

Riverside Drive near Zoo Drive Bridge Widening over Los Angeles River, City of Los Ange les, CA. Staff Geologist for field observation during installation of shoring and CIDH pile driving , field observation and testing of site soils during grading, and field measurements of vibration and noise during construction of the bridge widening and seismic retrofit of the project. The Riverside Drive near Zoo Drive Bridge over the Los Angeles River Project is located in City of Los Angeles near the Griffith Park area. The bridge is a 56- foot wide, four -lane Class II Major Highway that runs north -south over Los Angeles River. The project includes seismic retrofit of the abutments, widening of the bridge on the downstream side by 19 feet, Michael A. Baez Staff Geologist / Field Inspector

Page 2 of 6 ends

utility alteration of the existing Caltrans storm drain, and bike path improvements. The new portion of the deck will be supported by cast-in-place concrete box girders. Client: Tetra Tech/City of LA, 2017.

Laurel Canyon Boulevard Bridge over Tujunga Wash, City of Los Angeles, CA . Staff Geologist for field observation of sheet pile wall shoring installation and vibration monitoring during shoring installation .

The Laurel Canyon Boulevard (Blvd.) Bridge is located between Tonopah Street and Sheldon Street in the Arleta community of San Fernando region and was constructed in 1952 . The scope of the project is to widen both sides of the Laurel Canyon Blvd. Bridge to match the approach roadway width and eliminate the unsafe width restriction in this major arterial. The MWD 55-inch diameter East Valley Feeder (pipeline) runs in the east-west direction very close to the bridge and intersection of Laurel Canyon Boulevard and Tujunga Wash. As part of the project, shoring will be installed around the blow -off structure to protect the structure and pipeline during widening of the bridge. Client: Kimley-Horn Associates, Inc., 2017.

LBWD Large Potable Water Valve Replacement Project, City of Long Beach, CA. Staff Geologist for field investigation to characterize soil properties for geotechnical engineering analysis, field VOC screening and environmental sampling. Long Beach Water Department (LBWD) is planning to remove a large potable water valve located at the southwest of the intersection of Stearns Street and Bellflower Boulevard and build a new valve at northeast of the intersection. A 10-foot section of the water pipe is also reconstructed where the valve will be removed. Client: Psomas, 2017.

La Palma Complex Reservoir Rehabilitation, Cit y of Anaheim, CA . Staff Geologist for geotechnical observation and testing during construction of the project. The Water Services Division of the Public Utilities Department of the City of Anaheim is currently rehabilitating the La Palma Complex. The existing facilities include two (2) wat er storage reservoirs and a pump station that were constructed in the mid 1950’s. This project will install a new liner, replace the roof structure, provide seismic retrofit to the existing 4 million gallon (MG) reservoir, replace the pump station building and replace the existing pumps with new, more reliable, and efficient units. The project will also demolish the adjacent 3 MG reservoir that is not needed because of other available water storage sites. There is also an on -site, shallow water well placed in service in 1957 that is currently inactive and will be demolished. HAI acting as the Geotechnical Engineer of Record is providing geotechnical engineering support services including geotechnical observation and testing during construction of the project . HAI is also providing revised grading and foundation design recommendations to facilitate constructability and to optimize design and construction of the reservoir based on the actual subsurface conditions encountered at the site during construction. This resulted in major cost saving and expediting the project schedule. Client: Tetra Tech/ City of Anaheim, 2016-2017

Phase II Environmental Site Assessment State Street Bridge Widening, City of Los Angeles, CA . Staff Geologist for environmental field exploration including screening and sampling. The City of Los Angeles is in the process of modifying the State Street Bridge starting from Pomeroy Avenue South. HAI was requested by the City to prepare and implement a Sampling and Analysis Plan (SAP) for t he Phase II environmental Site Assessment to further examine the presen ce of hazardous materials within the proposed construction area. The SAP presented the recommended investigation locations, sampling, testing, and analysis to accomplish a better unders tanding of the site environmental conditions and provide legally appropriate methods for mitigating contaminated soils. Health and Safety procedures to be followed during the fieldwork were also included in the SAP. The SAP was reviewed and approved by the City of Los Angeles’ BOE and the California Department of Transportation (Caltrans) District 7’s Hazardous Waste Branch, Office of Environmental Engineering (OEE), Division of Environmental Planning.

Client: HNTB Corporation/City of Los Angeles, 2015-2017.

Michael A. Baez Staff Geologist / Field Inspector

Page 3 of 6 ends

Yorba Linda Water District (YLWD) Fairmont Booster Station Upgrade (FBSU), City of Yorba Linda, CA.

Staff Geologist for geotechnical observation and testing during construction of the project. Hushmand Associates, Inc. (HAI) conducted a geotechnical investigation for design and construction of Phase I of the FBSU project to include: 1) 7,300 gallon per minute (gpm) pumping capacity from Zone 675 to Zone 780 with three (3) electric pumps and one (1) variable frequency drive (VFD) electric pump; 2) 800 gpm pumping capacity from Zone 675 to Zone 920 with one (1) electric pump; 3) 2,800 gpm pumping capacity from Zone 920 to Zone 1,000 with one (1) electric pump.; 4) 2,800 gpm future pumping capacity from Zone 675/780 to Zone 1,000 with two (2) pump cans/suction piping only; and 5) A new 24-inch diameter, 800-linear-foot transmission pipeline in Fairmont Boulevard to replace Zone 4C 12-inch diameter pipeline in Fairmont Boulevard. All the above pumping capacities and three (3) pumping zone requirements for the FBSU project are housed in one (1) pump station structure and is referred to as Phase I. The new FBSU design includes: all pumps, piping upgrades, pipeline replacements, chlorine disinfection system, electrical, mechanical, and SCADA controls system, and site improvements to pump groundwater to these three (3) zones initially (675 to 780, 675 to 920, and 920 to 1,000). HAI is currently performing field observation and testing services during construction. Client: YLWD & MWH Americas, Inc., 2017

Glendale Hyperion Viaduct Complex Improvements, City of Los Angeles, CA. Staff Geologist for field sampling and investigation from Aerially Deposited Lead (ADL) borings and Yellow Traffic Strip Paint. The Bridge Complex is located between Atwater Village in the Northeast Los Angeles community planning area and the Hollywood community planning area of the city. HAI’s scope of work is to perform ADL and Yellow traffic Stripe sampling investigation to support proposed improvement of the complex. Client: Earth Mechanics, 2016.

Proposed Berm Replacement at Davis Wire Corporation Plant, City of Irwindale, CA. Staff Geologist for field boring logs, field percolation testing, field large sand -cone testing and double -ring field infiltration testing. The existing berm was located along the southwestern boundary of the Davis Wire Corporation Plant (DWC), and it measured approximately 1,360 feet long and 5 to 6 feet high. There are no engineering drawings and as-built compaction report for construction of this berm to verify relative compaction of the fill and the materials and method of construction used to build the berm. HAI’s scope of work included field investigation, laboratory testing and engineering analyses to evaluate the infiltration rate of soil and assess the stability of exiting berm slopes and to design and perform CQA services for a new replacement berm up to 9 feet in height to retain storm water at the project site. Client: Davis Wire Corporation, 2016.

Moisture Measurement at Evaporation Ponds for Mojave Solar Generation Station, City of Hinkley, CA.

Staff Geologist for performing moisture measurement testing using neutron moisture probe at the project site. The Mojave Solar Generation Station is located at 42134 Harper Lake Road, Hinkley, San Bernardino County, California. The facility includes two (2) evaporation pond areas, Alpha Pond area located north of the site and Beta pond area in the southern part of the site. Each pond area has two (2) ponds (east and west ponds) and four (4) sumps, two (2) in the east pond and two (2) in the west pond. There are three (3) pipe runs at each pond, each about 717 feet long, for in-situ neutron probe soil moisture readings. HAI visits the site twice a year for recording the moisture readings. Client: Abengoa Solar, Inc., 2015-ongoing.

Soto Street Bridge over Mission Road and Huntington Drive, City of Los Angeles, CA. Staff Geologist for field noise and vibration monitoring during construction of the project. The City of Los Angeles proposed the removal of Soto Street Bridge (currently extending between Supreme Court and Turquoise Street) and reconfiguration of the Soto Street/Mission Road and Huntington Drive South /Huntington Drive North intersections. HAI was contracted by the City of Los Angeles to provide geotechnical and environmental Michael A. Baez Staff Geologist / Field Inspector

Page 4 of 6 ends

engineering support and recommendations for excavations and backfilling, soil disposal, and for mitigation of the existing bridge foundations impac t on road pavements. HAI also performed noise and vibration monitoring to minimize the impact of the construction on the nearby residents and commercial facilities, particularly the potential damage and claims related to demolition activities. Client: City of Los Angeles Bridge Improvement Division/Tetra Tech, 2013-2017.

Citywide Curb Ramp Investigation Phase V Project, City of Redondo Beach, CA. Staff Geologist for performing field density testing during construction of the new sidewalk pavement. The city is removing the existing sidewalk and installing 1,239 square feet of new sidewalk and plac ing about 190 tons of 4- inch-thick asphalt c oncrete for the Phase V project. HAI is requested to conduct field density tests and laboratory testing for subgrade soil and asphalt concrete. Client: FS Contractors, Inc., 2016.

Central Basin Municipal Water District (CBMWD) Gateway Regional Recycled Water System Extension Project, City of Bell Gardens, CA. Staff Geologist for field investigation, soil logging and sample collection for laborato ry testing . CBMWD is planning to construct approximately 5,500 linear feet of recycled pipeline starting with a connection to the existing recycled pipeline in Garfield Avenue at Park Lane. The new pipeline will serve Veterans Park and Suva Elementary Intermediate School Complex. HAI conducted a field investigation, performed laborat ory testing and engineering analysis to provide geotechnical recommendations in terms of earthwork and compaction criteria, lateral earth pressures, shallow foundation design and pipe backfilling. Client: Infrastructure Engineers, Inc., 2017.

Cameron Avenue Sewer Main Rehabilitation Project, City of West Covina, CA. Staff Geologist for field investigation, soil logging and sample collection for Laboratory testing. This Rehabilitation Project consists of rehabilitating the existing 10-inch diameter vitrified clay pipe (VCP) sewer main along Cameron Avenue between Citrus Street and 750 feet east of Inman Road. The total length of sewer line is app roximately 2,000 feet. The proposed sewer line will be installed using the pipe bursting method in the same alignment of existing sewer pipeline with a new 14-inch diameter High Density Polyethylene (HDPE) pipe. HAI’s scope of work included field exploration, laboratory testing and engineering analysis to provide geotechnical recommendations on earthwork and compaction criteria, lateral earth pressures, shallow foundation design and pipe backfilling. Client: Onward Engineering, 2017.

Marathon Refinery civil construction projects, Carson, CA. Soil inspection for various projects throughout the Marathon refinery. The projects consisted of observing grading projects and inspecting drilled piles and driven piles, as well as backfill opera tions. Soil inspection was also done in the Wilmington side of the refinery with backfill operations and excavation footings inspections for spread footings, as well as Mat foundations. HAI’s scope of work was to support the inspection company Mistras with the soil inspections. Client: Mistras, 2017-2020

El Toro Water District Recycled Water Line Project, Laguna, CA. Staff Geologist for geotechnical observation and testing during backfill operations, as well as asphalt paving for the new recycled water throughout the Laguna Woods Village in Laguna, CA. HAI is requested to conduct field density test and laboratory testing for the soil backfill and asphalt concrete. Client: El Toro Water District, 2017-2018

Port of Long Beach Microgrid JCC Project, Long Beach, CA. Staff Geologist for environmental field sampling of excavated soil near the Port of Long Beach for pot holing. The soil was checked for VOC’s as well as other possible contaminates and were sample d using the standard operating procedure for environmental sampling. HAI scope of work was to collect environmental field sampling and prepare the Michael A. Baez Staff Geologist / Field Inspector

Page 5 of 6 ends

report and consult the client on the environmental sampling results required for the Port of Long Beach and the excavated soils. Client: C-Below, 2019.

North Atwater Multimodal Bridge Project, Los Angeles, CA. Staff Geologist for geotechnical observation and testing for the backfilling of soils for the pavement grading on the East and West portion of the new multimodal bridge. HAI is requested to conduct field density test and laboratory for the soil backfill. Client:

T.Y. Lin International, 2019

Albertoni Street Rehabilitation Project, Carson, CA. Staff Geologist for performing field density testing during construction of the new sidewalk and driveway pavement. The city is removing the existing sidewalks and driveways and replacing them. HAI is requested to conduct field density test and laboratory testing for the Crushed Aggregate Base, as well as Crushed Miscellaneous Base. Client: City of Carson, 2019.

Fire Station #1 and Fire Station #3 Project, Downey, CA. Staff Geologist for geotechnical observation and testing during the construction of the project. HAI acting as the Geotechnical Engineer of Record is providing geotechnical engineering support services including geotechnical observation and testing during construction of the project, and HAI conducted a geotechnical investigation of both fire stations for design and construction of Fire Station #1 and #3. Client: City of Downey, 2019.

Permanent Protection of Penstock at Shakefl at Creek Crossing Near Mammoth P ool, Sierra National Forest Madera County, CA. Staff geologist for the construction observation and testing during the construction of the project and provided CQA during the construction. HAI acting as the Geotechnical Engineer of Record is providing geotechnical engineering support services including geotechnical observation and testing during construction of the project. HAI is also providing revised grading and foundation design recommendation based on the actual subsurface conditions encountered at the site during construction. Client: Southern California Edison, 2019.

Well No. 15 and Well No.18 Improvements and On-site Sodium Hypoclorite Generation System Project, Placentia, CA. Staff Geologist for field investigation to characterize soil properties for geotechnical engineering analysis. Yorba Linda Water District (YLWD) is planning to construct Well No. 18 Well collector Line at YLWD office. Client: Yorba Linda Water District, 2020 Proposed Cover Thickness Excavation and Cover Evaluation Sample Locations of Site 3, Main Base Inactive Landfill Edwards Air Force Base (AFB), Kern County, CA. Staff Geologist for field investigation to characterize soil properties for geotechnical analysis and performed hand auger cover investigation of 9 locations for the proposed cover thickness, as well as test pits of 10 locations for the cover evaluation.

HAI’s scope of work was to do the site investigations using a hand auger, performing test pits, and collecting samples for laboratory testing. Client: Oneida Total Integrated Enterprise, 2020

Ranch Roadway Improvement Phase I and II, Laguna Beach, CA. Staff Geologist for performing field density testing during 2 -inch asphalt concrete overlay over existing asphalt on Country Club Dr. HAI is requested to conduct field density test and laboratory testing for asphalt concrete. Client: South Coast Water District, 2020.

I-105 Express Lane Project. Staff Geologist doing exploratory boring and logging using the modified California Sampler. HAI was requested to do the exploratory drilling on the I-105 freeway and logging and Michael A. Baez Staff Geologist / Field Inspector

Page 6 of 6 ends

collecting the soil samples collected and taken to the HAI laboratory for further Geotechnical Testing. The drilling was along the I-105 freeway, as well as in the above service roads. 2022

Isabella Lake Dam Safety Modification Project. HAI performed construction quality control (CQC) and performed laboratory materials testing on soil samples and aggregate materials used for the dam concrete structures and was validated by United States Army Core of Engineers (USACE). Also performed field density testing and concrete field sampling during the construction of the auxiliary Dam and Main Dam.

All testing was conducted in accordance with applicable ASTM and Corps of Engineers. 2020-2023

Page 1 of 3 ends

AARON HUBBARD

SPECIAL INSPECTOR/BUILDING INSPECTOR

Cer�fica�ons
• AWS-CWI Welding Inspector
• ICC Structural Steel/Welding
• ICC High Strength Bol�ng
• ICC Structural Concrete
• ACI Technician
• LA County Deputy Inspector
• LA City Cer�fied Fabricator QC
• AISC Quality Manager

Professional Summary
An experienced quality assurance/quality control professional with over 14 years of inspec�on exper�se and more than 11 years as a structural ironworker and welder. Mr. Hubbard brings extensive experience managing QC programs and consul�ng for steel fabricators. As the President of AMH Quality Assurance Inc., he leads inspec�on services across mul�ple disciplines, including welding, bol�ng, and reinforced concrete. Known for team collabora�on and problem-solving, he specializes in AISC-accredited programs, ensuring compliance with AWS, AISC, ISO 9000, and municipal standards.

Relevant Shop Quality Control Experience
Bell Brothers Steel
Quality Control Manager / AWS-CWI / LA City Fabricator Inspector • Developed and implemented PQRs/WPSs and secured AISC accredita�on. • Managed a comprehensive QC documenta�on system adhering to AWS, AISC, and ISO 9000 protocols.
• Qualified and cer�fied welders for over 70 projects, ensuring compliance with LA City standards. • Oversaw MTRs, daily repor�ng, and inspec�ons for structural fabrica�on and installa�ons.

Page 1 of 2 ends

AMER ALBAWAB

SENIOR FIELD TECHNICIAN

Cer�fica�ons
• ACI Field Tes�ng Technician Grade 1 cer�fied.
• ICC Cer�fied for:
o Reinforced Concrete.
o Structural Masonry
o Structural Welding
o Structural Steel and Bol�ng
• Nuclear Gauge Safety & U.S. D.O.T. Hazmat Cer�fica�on
• Extensive knowledge of building code, materials, and applica�on methods. ACI 318 code and materials, ASTM materials and tes�ng, IBC.

Years of Experience
10 Education:
• SI Certs Online Inspection Training
• Larsen Inspection Training
• International Code Council (ICC) Certifications
• University of Phoenix, Los Angeles, CA — Bachelor’s in IT

Professional Summary
Amer is a highly mo�vated construc�on special inspector with a strong passion for gaining field experience and taking leadership roles. Commited to exceeding expecta�ons, consistently delivering top-notch performance. Possesses extensive knowledge of building codes, standards, and inspec�on du�es, with a robust background in the construc�on industry and excep�onal interpersonal communica�on skills.

PROJECTS EXPERIENCE:
• SCE Twin Lakes BESS - Bridgeport, CA
• SCE San Gorgonio Flowline - N Banning, CA
• SCE Big Creek Dam - Big Creek, CA
• West Covina High School - West Covina, CA
• Perris High School - Perris, CA
• Volar by Garden Communities - Irvine, CA
• SunPower - Rialto, CA
• World Energy Paramount Refinery - Paramount, CA

Amer Albawab Senior Field Technician

Page 2 of 2 ends

Performed Field Tasks:
• QA/QC inspections for reinforced concrete and shotcrete • QA/QC masonry inspection
• Concrete batch plant inspections
• Reinforced steel and structural steel tag and sample inspections • Epoxy dowels, wedge anchor bolt, and torque testing inspections • Field and shop welding inspections per AWS acceptance criteria • Pull test inspection for hanger and bracing wire
• Schmidt Hammer testing
• HDPE fusion welding inspection
• Auger cast-in-place and cast-in-drilled-hole pile installation inspections • Soil bore hole inspections, classification, and sampling

Page 1 ends

WOODY DREW ARNOLD, EIT

FIELD ENGINEER
Certifications
• Engineer-In-Training Certificate, State of California, 2011 • Radiation Safety and Use of Nuclear Gages
• ACI Aggregate Testing Technician Level 1 (5/1/2023)
• ICC Soils Special Inspector (1/19/2023)
• ACI Concrete Strength Testing Technician (6/21/2022) Education
• MS Coursework in Environmental Engineering, San Diego State University 2015 • Fall Semester Abroad, Technische Universität Graz, 2013 • BS Civil Engineering, California State University, Long Beach, 2009 Year of Experience
• 4 Years with HAI
Mr. Arnold has more than 4 years of experience as a field engineer / construction quality assurance monitor working on a large number of construction and geotechnical engineering projects involving earth dam soil embankment and reinforced concrete spillway construction (including underwater inspections and surveys as part of initial evaluation of dam conditions), solid waste landfill construction including installation of landfill leachate collection and recovery system (LCRS) pipelines and pump systems, landfill gas (LFG) extraction system (wells/pipes and blower/flare system) for an LFG energy project, shallow and deep foundation (CIDH pil es) construction, utility search trenching and installation of piping and foundation systems in refineries, grading activities, compaction testing, and soil infiltration testing. Mr.

Arnold also has experience in geotechnical field investigations (logging & sampling of borings, supervising Electric Cone Penetration Testing, perform ing Dynamic Cone Penetrometer tests, and conduct ing soil infiltration tests), and laboratory testing for various geotechnical engineering projects. He also has experience working at a major packaging & shipping facility working with & repairing automated conveyer belts, robot (puck) sorters, and sophisticated scanning equipment.

RELEVANT EXPERIENCE
City of Watsonville Sanitary Landfill, Watsonville, Santa Cruz County, California (April 2023 - present) CQA Monitor supervising the 7-acre Phase (Cell) 4 Landfill Expansion Project Composite Liner construction and the 6 -acre Phase 3 L andfill Cover construction . CQA responsibilities included inspection , documentation, and testing of geosynthetics installation and backfill soils placement (nuclear gauge and sand cone density testing of the subgrade and compacted clay liner, cover soil, and operation layer) .

Inspected assembly of mechanical elements of leachate collection and re moval sy stem (LCRS) such as piping and pumps. The LCRS is designed to drain leachate to collection sumps which consist of an HDPE riser and submersible pump. Leachate drains to the leachate collection system, where it is transferred to a central collection pump and piped to an onsite holding pond. If necessary, the leachate is transported to an approved offsite wastewater treatment plant for disposal. The system is designed to automatically pump leachate to maintain compliance with state requirements.

Observes and documents installation of landfill gas (LFG) collection and processing mechanical systems.

Instead of escaping into the air, LFG is captured, converted, and used as a renewable energy resource.

LFG is extracted from landfills using a series of wells a nd a blower/flare (or vacuum) system. This system Woody Drew Arnold Field Engineer

Page 2 ends

directs collected gas to a central point where it can be processed and treated depending upon the ultimate use for the gas. From this point, the gas can be flared or beneficially used in an LFG energy project.

USACE Isabella Lake Dam Safety Modification Project (DSMP), Phase II Dams and Spillway, Lake Isabella, Kern County, California (2021 - 2023) - Field Engineer providing laboratory and field-testing services as part of the on-site construction quality control (CQC) services provided by HAI to Joint Venture of Flatiron, Dragados & Sukut (FDSJV). HAI established a laboratory facility at the Project site validated by AASHTO and the USACE to perform laboratory testing on flexural performance of shotcrete, compressive strength of concrete, and on samples of soil and aggregate materials used for the dam concrete structures, filters, drains, and slope rock revetment for Phase II improvements of the existing Isabella Earthfill Dam. As part of the initial evaluation of the dam conditions underwater inspections and survey s were performed to check dam outlets and potential slope erosion prior to lowering the dam water level.

Lakeview Reservoir, Yorba Linda, California (2021 - 2023) - Field Engineer providing geotec hnical engineering services for monitoring ground movement through inclinometer and crack gauge readings used to provide distress mitigation recommendations.

Boeing’s Santa Susana Field Laboratory Site Cleanup Project, Bravo Rd, Brandeis, near Simi Valley, California (February 2024 to May 2024) - Performed field Dynamic Cone Penetration (DCP) testing and used the penetration data for evaluating foundation bearing capacity for the existing Enviro -Block (or Inter-Block) retaining wall system, referred to as Shine Wall, at Santa Susana Field Laboratory, in Simi Valley, California. The wall is used to surround and isolate cleanup activities from the rest of the site.

The former Santa Susana Field Laboratory was a rocket engine testing and nuclear power research site used for federal government programs. The Simi Valley site was where thousands of workers tested rocket engines used to defend the country, land on the moon, and launch satellites for GPS and cell phones. It was also a test site for advanced energy research programs.

Marathon Refinery, Carson, Los Angeles County, California (2023 - 2024) - Field Engineer for monitoring and documentation of CIDH piles installation, test foundation excavations subgrade for fuel storage tanks construction, supervise and document information during underground utilities installation, and perform moisture content-density testing of the backfill soils for utility trenches & foundations.

World Energy Paramount Refinery, Renewable Fuels Conversion Energy Project, Paramount, Los Angeles County, California (2021 - 2023) - Field Engineer for monitoring and documentation of CIDH piles installation, test foundation excavations subgrade, supervise and document information obtained during hydro-trenching to locate underground utilities, and perform Dynamic Cone Penetrometer (DCP) tests for road design.

El Sobrante Landfill, Waste Management, Corona, California (2021 - 2022) - CQA Monitor supervising the 23-acre Phase 13A Composite Liner construction consisting of 2.2 million square feet of geosynthetics, 1.1 million square feet of GCL and additional geotextiles. CQA responsibilities also included sand cone density and nuclear gauge density testing of the compacted clay liner, Modified Proctor compaction and sieve analysis (gradation) laboratory testing, and data management for earthworks and geosynthetics.

BNSF Waterline Crossing Relocation, Yorba Linda, California (2022) - CQA Monitor supervising construction of BNSF Waterline Crossing Relocation project, located in City of Yorba Linda, California.

Performed laboratory tests on materials used for backfilling of the launch pit, the receiving pit , ramp trench, and a limited area beyond the pit locations.

I-105 Express Lanes (Segment 1) WSP/LA Metro/Caltrans, California (2021-2022) - Senior field technician providing Double-Ring Infiltration (DRI) field testing as well as laboratory testing services for I-105 Express Lanes Expansion Project.

Woody Drew Arnold Field Engineer

Page 3 ends

Southern California Edison (SCE) – Parking and Access Road Improvement Projects, California (2021) Senior field technician providing grading monitoring and compaction testing for parking lots, driveways, access roads, etc. for 1) SCE - Con Tec Construction (2021), 2) SCE - Patriot Paving, Inc. (2021) & 3) SCE - Dumarc Corp. projects including the SCE North Coast Office Building parking lot in Santa Clarita, CA involving application of soil-cement to stabilize soft subgrade soils (2022).

E91/N15 Express Lane Arlington Temporary Access Bridges (Bent 5), E91 Freeway over Temescal Wash, Corona, California (2022) - Senior field technician performing Dynamic Cone Penetration (DCP) testing to estimate in -situ resistance and bearing capacity of subgrade soils at Arlington Channel near the intersection of the 91 Freeway and Temescal Wash for the E91/N15 Express Lane Arlington Temporary Access Bridges (Bent 5).

United Parcel Service (UPS) Shipping & Receiving and Supply Chain Management Co. Automated Hub in Compton, CA (2016 -2018) – Inspected, monitored, and assisted with repair of conveyer belts, robot sorters called puck sorters, and sophisticated scanning equipment.

Harold Muns
Certified Welding Inspector
1141 W 6th Street
San Pedro, CA 90731
Objective
To obtain a Quality Assurance/Quality Control position utilizing the knowledge and certifications I have as a Certified Welding Inspector.

Certifications
• AWS Certified Welding Inspector #14080681
Endorsements: AWS D1.1, AWS D1.5
• ICC Structural Welding Special Inspector #8277570
• ICC Structural Steel and Bolting Special Inspector #8277570 • ICC Spay-Applied Fireproofing Special Inspector #8277570 • Los Angeles City Deputy: Steel Construction Lic.#P034931 • SB 854 Registration Number: 1000795329
• Transportation Worker Identification Credential holder (TWIC) Education
• Los Angeles Harbor College
Associates of Arts
Math/Biology/Chemistry
• Innovative Inspection Training
AWS CWI inspector training course
S1: ICC Structural Steel and Bolting inspector training course

2 Notable Projects
• 2022-Present World Energy Paramount Renewable Fuels Project (5 Billion) Renovation and New Construction: Lead structural steel inspector Codes: AWS D1.1, D1.8, AISC, ASME, CBC Title 24
• 2021-2022 Veteran’s Administration Community Living Center (1.5 Billion) New Construction: Lead structural steel inspector Codes: AWS D1.1, D1.3, D1.4, D1.8, AISC, ASME, CBC Title 24 • 2021 Providence Tarzana Medical Center
(900 Million) New Construction: Shop inspection at Murray Co. for 3”-16” chilled water lines
Codes: ASME
• 2019-2020 Origins-Golden State Expansion Project/Disneyland (? Billion) New Construction: Structural steel and pipe welding (6”-24”), Bolting deputy inspector
Codes: AWS D1.1, D1.3, D1.4, D1.8, AISC, ASME, CBC Title 24 • 2016-2018 Frontierland Expansion Project/Disneyland
(2 Billion) New Construction: Structural steel and bolting deputy inspector Codes: AWS D1.1, D1.3, D1.4, D1.8, AISC, ASME, CBC Title 24 • 2016 Broadcom OCPC
(1 Billion) New Construction: Structural steel welding/bolting/fireproofing Special inspector
Codes: AWS D1.1, D1.3, D1.4, D1.8, AISC, CBC Title 24
• 2014-2015 U.C. Irvine, Social Science/Student Center/Mesa Solar Canopies (? Million) New and Renovation. Structural steel welding and bolting special inspector Codes: AWS D1.1, D1.8, AISC, CBC Title 24
3 Experience
2022 – Present
Harder Mechanical Contractors
Communicate in an efficient and professional manner with owners/clients, engineers, contractors and city officials.

Evaluate welds according to governing building codes, municipal codes, approved plans and project specifications.

Oversite of Non-destructive testing: scheduling and maintaining records of UT/MT required by contract documents.

Extensive field and shop welding\bolting inspection, mapping and material identification. 2012 - 2022
H.M.I.S./Harold Muns Inspection Services
Communicate in an efficient and professional manner with engineers, owners, contractors and city officials.

Evaluate welds according to governing building codes, municipal codes, approved plans and project specifications.

Oversite of Non-destructive testing: scheduling and maintaining records of UT/MT required by contract documents.

Extensive shop welding inspection and material identification.

Possess the appropriate tools including the following: precision weld measuring tools, infrared temp gun, multi-meter, dry-film measuring indicator, needle thickness gauge, calibrated torque wrenches.
1998 – 2012
Grageda Plumbing Company
Journeyman Pipefitter
Fabrication of brazed and soldered assemblies
Pipe fitting, light welding (SMAW), framing
Interpretation of blueprints/plans
Write WPS’s
Procurement and identification of materials

TRAVIS TROUPE

PROFILE
Deputy building inspector with extensive expertise in building codes, specifications, and challenging field conditions across many construction industries. Adapts well to pressure and complex situations. Works closely with contractors, structural engineers and project owners. Offers over 18 years of experience, backed by multiple ICC and ACI certifications as well as being registered with most jurisdictions in Southern California.

CERTIFICATIONS
ACI (Cert #01102760) Concrete Field Testing Technitian-Grade 1, ICC (Lic #5294192)- Reinforced Concrete, Structural Steel and Bolting, Prestressed Concrete, Residential building inspector.

EXPERIENCE

Rancho Vista Seismic Retrofit, Rancho Cucamonga, 12/23-1/24 Welding inspection at existing roof and truss system. Added puddle welds and joist supports throughout existing structure.

Big Creek Dam Walkway replacement, Big Creek, 7/23
Observed drilling 2” diameter core holes, recored depths and observed grout mixing and placement for walkway anchors.

Catalina Sinkhole Repair, Catalina Island, 1/22-2/22
Rebar inspection and concrete placement at new slab on grade section in parking lot and equipment pad. Veri
fied rebar, observed concrete placement and performed
materials sampling.

San Gorgonia Flowline #1, Banning, 8/22-11/22
Observed and documented fusion welding at main flow line, inspect rebar and concrete placement by helicopter for thrust blocks and performed on site concrete batch testing and sampling.

Million Dollar Road Repair Site #6, Big Creek, 8/21
Shotcrete placement at drain apron. Onsite testing for air content, slump an sampling.

HAI Soil & Materials Testing
Certified Laboratory
(AMRL, CCRL, Caltrans, USACE,
City of Los Angeles)
Kang Lin, BS, EIT
Michael Baez, BS Geology
Woody Arnold, BS Civil Eng., EIT

GEOTECHNICAL LABORATORY
TESTING Ashkaan (Alex) Hushmand, PhD, PE, GE
Woody Arnold, BS Civil Eng., EIT (CQA officer)
Arash Hushmand, BS Pol. Science, CQA Monitor
Ben Hosseini, BS Civil Eng., CQA Monitor
Michael Baez, BS Geology, CQA Monitor
Amer Albawab, BS IT/Computer, CQA Monitor
Jason Ramsey, Special Inspector/NDT Technician
Harold Muns, Certified Welding Inspector, Special Inspector Travis Troupe, Special Inspector/Building Inspector

FIELD INSPECTION & TESTING
Ernesto Vicente, PhD, PE, GE, Lead Geotechnical Engineer Christopher Sexton, MS, PG, CEG, Lead Eng. Geologist

PROJECT LEAD
Ben Hushmand, PhD, PE, Project Manager

PROJECT MANAGEMENT TEAM
Ernesto Vicente, PhD, PE, GE
Bidjan Ghahreman, PhD, PE, GE
Christopher Sexton, MS, PG, CEG
Ashkaan Hushmand, PhD, PE, GE
Bala Jayaprakas, MS, PE
Santosh Bhattarai, MS, PE
Maryam Varsei, MS

GEOTECHNICAL & GEOLOGICAL CONSULTATION

AND CQA DOCUMENT PREPARATION
HUSHMAND ASSOCIATES INC. (HAI)

CONSTRUCTION QUALITY ASSURANCE (CQA)

APPENDIX C
Staff Certifications & Licenses
PE Licenses

HUSHMAND, ASHKAAN
LICENSE NUMBER: 3187 LICENSE TYPE: GEOTECHNICAL ENGINEER LICENSE STATUS: CLEAR EXPIRATION DATE: SEPTEMBER 30, 2025 SECONDARY STATUS: N/A
CITY: IRVINE STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92618

HUSHMAND, ASHKAAN
LICENSE NUMBER: 78504 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR EXPIRATION DATE: SEPTEMBER 30, 2025 SECONDARY STATUS: N/A
CITY: IRVINE STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92618

JAYAPRAKAS, BALASEKARAM
LICENSE NUMBER: 94578 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR EXPIRATION DATE: MARCH 31, 2027 SECONDARY STATUS: N/A
CITY: CERRITOS STATE: CALIFORNIA COUNTY: LOS ANGELES ZIP: 90703

HUSHMAND, BEHNAM
LICENSE NUMBER: 44777 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR EXPIRATION DATE: MARCH 31, 2026 SECONDARY STATUS: N/A
CITY: LAGUNA NIGUEL STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92677

GHAHREMAN, BIDJAN
LICENSE NUMBER: 3111 LICENSE TYPE: GEOTECHNICAL ENGINEER LICENSE STATUS: CLEAR EXPIRATION DATE: MARCH 31, 2025 SECONDARY STATUS: N/A
CITY: IRVINE STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92618

GHAHREMAN, BIDJAN
LICENSE NUMBER: 80886 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR EXPIRATION DATE: MARCH 31, 2025 SECONDARY STATUS: N/A
CITY: IRVINE STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92618

SEXTON, CHRISTOPHER JOHN
LICENSE NUMBER: 1441 LICENSE TYPE: ENGINEERING GEOLOGIST LICENSE STATUS: CLEAR EXPIRATION DATE: NOVEMBER 30, 2026 SECONDARY STATUS: N/A
CITY: SIMI VALLEY STATE: CALIFORNIA COUNTY: VENTURA ZIP: 93065

SEXTON, CHRISTOPHER JOHN
LICENSE NUMBER: 4612 LICENSE TYPE: GEOLOGIST
LICENSE STATUS: CLEAR EXPIRATION DATE: NOVEMBER 30, 2026 SECONDARY STATUS: N/A
CITY: SIMI VALLEY STATE: CALIFORNIA COUNTY: VENTURA ZIP: 93065

TERRES, DONALD ALBERT
LICENSE NUMBER: 1362 LICENSE TYPE: ENGINEERING GEOLOGIST LICENSE STATUS: CLEAR EXPIRATION DATE: JANUARY 31, 2027 SECONDARY STATUS: N/A
CITY: IRVINE STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92620

TERRES, DONALD ALBERT
LICENSE NUMBER: 4349 LICENSE TYPE: GEOLOGIST
LICENSE STATUS: CLEAR EXPIRATION DATE: JANUARY 31, 2027 SECONDARY STATUS: N/A
CITY: IRVINE STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92620

VICENTE, ERNESTO EDGARDO
LICENSE NUMBER: 2302 LICENSE TYPE: GEOTECHNICAL ENGINEER LICENSE STATUS: CLEAR EXPIRATION DATE: JUNE 30, 2025 SECONDARY STATUS: N/A
CITY: TUSTIN STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92780

VICENTE, ERNESTO EDGARDO
LICENSE NUMBER: 46895 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR EXPIRATION DATE: JUNE 30, 2025 SECONDARY STATUS: N/A
CITY: TUSTIN STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92780 Certifications

Arash Hushmand
September 13, 2022
39101-166-309-3651

Amer Albawab
July 15, 2023
23675-168-946-3120

AMER ALBAWAB
Reinforced Concrete Special Inspector Associate
Given this day October 16, 2020
Certificate No. 9661642

AMER ALBAWAB
Structural Steel and Bolting Special Inspector
Given this day November 17, 2021
Certificate No. 9661642

AMER ALBAWAB
Structural Masonry Special Inspector
Given this day December 2, 2020
Certificate No. 9661642

AMER ALBAWAB
Structural Welding Special Inspector
Given this day June 15, 2022
Certificate No. 9661642

WOODY ARNOLD
Soils Special Inspector
Given this day January 19, 2023
Certificate No. 10267455

MICHAEL BAEZ
Soils Special Inspector
Given this day February 1, 2023
Certificate No. 10278636

JASON RAMSEY
Structural Welding Special Inspector
Given this day May 7, 2014
Certificate No. 8219163

JASON RAMSEY
Structural Steel and Bolting Special Inspector
Given this day September 4, 2013
Certificate No. 8219163

JASON RAMSEY
Reinforced Concrete Special Inspector
Given this day September 24, 2020
Certificate No. 8219163

JASON RAMSEY
Spray Applied Fire Proofing Special Inspector
Given this day October 6, 2020
Certificate No. 8219163

APPENDIX D
Firm Certifications

/0 /1 /1 /i255 /3 /4 /5 /6 /7 /8 /5 /5 /8 /5 /i255 /9 /10 /8 /i255 /8 /7 /11 /12 /4 /10 /9 /13 /8 /14 /i255 /15 /12 /i255 /16 /10 /12 /17 /6 /14 /8 /i255 /17 /12 /1 /4 /7 /15 /9 /10 /18 /i255 /14 /6 /17 /8 /10 /5 /6 /15 /18 /i255 /14 /9 /15 /9 /i255 /6 /7 /19 /12 /10/20/9/15 /6 /12 /7 /i255 /6 /7 /i255 /15 /21 /8 /6 /10 /i255 /22 /9 /1 /8 /23 /10 /12 /11 /4 /10 /8 /i255 /16 /10 /12 /19 /6 /1 /8 /5 /24 /25 /21 /8 /i255 /14 /9 /15 /9 /i255 /26 /6 /1 /1 /i255 /21 /8 /1 /16 /i255 /4 /5 /i255 /5 /21 /9 /16 /8 /i255 /16 /12 /1 /6 /11 /6 /8 /5 /i255 /9 /7 /14 /i255 /14 /8 /17 /8 /1 /12 /16 /i255 /5 /15 /10 /9 /15 /8 /13 /6 /8 /5 /i255 /15 /12 /i255 /6/20/16/10 /12 /17 /8 /i255 /12 /16 /16 /12 /10 /15 /4 /7 /6 /15 /6 /8 /5 /i255 /19 /12 /10 /i255 /9 /1 /1 /i255 /3 /4 /5 /6 /7 /8 /5 /5 /8 /5 /i255 /15 /12 /11 /12 /7 /15 /10 /9 /11 /15 /i255 /26 /6 /15 /21 /i255 /15 /21 /8 /i255 /5 /15 /9 /15 /8 /24 /i255 /22 /1 /6 /11 /28 /i255 /i255 /29 /30 /31 /30 /i255 /32 /21 /15 /15 /16 /5 /33 /34 /34 /19 /6 /5 /11 /9 /1 /24 /11 /14 /7 /24 /16 /10 /6 /5/20/6/11 /24 /6 /12 /34 /19 /6 /5 /11 /9 /1 /34 /35 /36 /37 /37 /37 /38 /3 /39 /40 /36 /14 /41 /8 /40 /37 /41 /9 /35 /40 /3 /36 /37 /41 /40 /36 /35 /42 /38 /11 /35 /43 /44 /35 /43 /36 /35 /45 /46 /6 /17 /8 /10 /5 /6 /15 /18 /47 /46 /9 /15 /9 /47 /23 /10 /12 /11 /8 /14 /4 /10 /8 /5 /47/48/39/44 /31 /8 /13 /6 /5 /15 /8 /10 /8 /14/48/39/36 /47/48/39/44 /42/48/39/36 /24 /16 /14 /19 /49 /19 /12 /10 /i255 /6 /7 /5 /15 /10 /4 /11 /15 /6 /12 /7 /5 /24 /i255 /50 /12 /10 /8 /6 /7 /19 /12 /10/20/9/15 /6 /12 /7 /i255 /6 /5 /i255 /9 /17 /9 /6 /1 /9 /3 /1 /8 /i255 /12 /7 /i255 /15 /21 /8 /i255 /51 /15 /9 /15 /8 /26 /6 /14 /8 /i255 /51 /4 /16 /16 /1 /6 /8 /10 /i255 /46 /6 /17 /8 /10 /5 /6 /15 /18 /i255 /23 /10 /12 /13 /10 /9 /20 /32 /21 /15 /15 /16 /5 /33 /34 /34 /26 /26 /26 /24 /14 /13 /5 /24 /11 /9 /24 /13 /12 /17 /34 /23 /46 /34 /0 /3 /12 /4 /15 /34 /23 /9 /13 /8 /40 /22 /12 /7 /15 /8 /7 /15 /34 /23 /46 /40 /52 /10 /9 /7 /11 /21 /40 /53 /7 /15 /10 /12 /40 /0 /11 /11 /12 /10 /14 /6 /12 /7 /40 /54 /6 /5 /15 /34 /51 /15 /9 /15 /8 /26 /6 /14 /8 /40 /51 /4 /16 /16 /1 /6 /8 /10 /40 /46 /6 /17 /8 /10 /5 /6 /15 /18 /40 /23 /10 /12 /13 /10 /9/20/34/51 /15 /9 /15 /8 /26 /6 /14 /8 /40 /51 /4 /16 /16 /1 /6 /8 /10 /40 /46 /6 /17 /8 /10 /5 /6 /15 /18 /40 /23 /10 /12 /13 /10 /9/20/49/i255 /16 /9 /13 /8 /24 /22 /8 /10 /15 /6 /19 /6 /11 /9 /15 /6 /12 /7 /i255 /23 /10 /12 /19 /6 /1 /8 /55 /56 /57 /56 /58 /i255 /60 /61 /i255 /62 /57 /63 /64 /61 /60 /65 /66 /64 /57 /i255 /62 /58 /65 /56 /64 /61 /64 /67 /57 /56 /64 /60 /66 /i255/i255
/22 /8 /10 /15 /6 /19 /6 /11 /9 /15 /6 /12 /7 /i255 /53 /46 /33 /i255 /42 /43 /38 /68 /35 /41 /39 /69 /58 /70 /57 /63 /i255 /71 /72 /73 /64 /66 /58 /73 /73 /i255 /74 /57/75/58 /76 /77 /55 /76 /78 /79 /74 /80 /i255 /79 /55 /55 /81 /62 /82 /79 /83 /84 /55 /i255 /82 /74 /62 /80 /60 /64 /66 /70 /i255 /71 /72 /73 /64 /66 /58 /73 /73 /i255 /79 /73 /i255 /85 /80 /71 /79 /86 /i255 /74 /57/75/58/87 /i255
/80 /60 /64 /66 /70 /i255 /71 /72 /73 /64 /66 /58 /73 /73 /i255 /79 /73 /i255 /85 /80 /71 /79 /86 /i255 /74 /57/75/58/89 /i255
/81 /90 /64 /67 /58 /i255 /91 /92 /60 /66 /58 /i255 /74 /72/75/93/58 /65 /94 /95 /94 /96 /97 /97 /97 /96 /87 /89 /98 /99
/71 /72 /73 /64 /66 /58 /73 /73 /i255 /100 /57 /101 /i255 /74 /72/75/93/58 /65 /94 /95 /94 /96 /97 /97 /97 /96 /87 /89 /97 /102
/79 /103 /103 /65 /58 /73 /73
/89 /104 /99 /i255 /105 /81 /80 /80 /79 /106 /80
/82 /106 /107 /82 /74 /84
/62 /79 /i255 /94 /89 /102 /87 /98 /108 /95 /102 /89 /104 /84/75/57/64 /63 /109
/3 /8 /7/110/21/9 /6 /8 /7 /13 /24 /11 /12/20/i255/32/20/9/6 /1 /15 /12 /33 /3 /8 /7/110/21/9 /6 /8 /7 /13 /24 /11 /12/20/49 /83 /60 /56 /57 /63 /i255 /74 /72/75/93/58 /65 /i255 /60 /61 /i255 /84/75/111/63 /60 /112 /58 /58 /73 /87 /104
/71 /72 /73 /64 /66 /58 /73 /73 /i255 /83 /112 /111 /58 /73 /55 /58 /65 /113 /64 /67 /58
/0 /1 /2 /3 /4 /5 /2 /2 /i255/7/5/8 /i255 /9 /10 /10 /11 /5 /2 /2 /12 /12 /12 /13 /14 /15 /16 /17 /18 /19 /13 /20 /21/22/i255/24 /14 /25 /25 /26 /27 /28 /28 /12 /12 /12 /13 /14 /15 /16 /17 /18 /19 /13 /20 /21/22/29 /30 /5 /11 /31 /3 /32 /5 /i255 /9 /11 /5 /33 /2
/9 /34 /33/35/5/10 /33 /i255 /36 /i255 /9 /34 /37 /3 /4 /5 /i255 /36 /i255 /9/35/33/10 /38 /11 /i255 /36 /i255 /0 /1 /39 /39 /5 /i255 /36 /i255 /40 /33 /34 /33 /31 /5 /11 /33 /2 /i255 /36 /i255 /40 /38 /34 /1 /2 /33 /i255 /36 /i255 /40 /38 /4 /39 /11 /33 /i255 /40 /38 /2 /39 /33 /i255 /36 /i255 /41 /5 /34 /i255 /42 /38 /11 /39 /5 /i255 /36 /i255 /43 /34 /i255 /41 /38 /11 /33 /10 /38 /i255 /36 /i255 /44 /11 /5 /2 /4 /38 /i255 /36 /i255 /45 /34 /5 /4 /4 /i255 /36 /46 /1/35/8/38 /34 /10 /39 /i255 /36 /i255 /47/35/37/5 /11 /3 /33 /34 /i255 /36 /i255 /47 /4 /48 /38 /i255 /36 /i255 /49 /5 /11 /4 /i255 /36 /i255 /49 /3 /4 /50 /2 /i255 /36 /i255 /51 /33 /52 /5 /i255 /36 /i255 /51 /33 /2 /2 /5 /4 /i255 /36 /i255 /51 /38 /2 /i255 /9 /4 /50 /5 /34 /5 /2 /i255 /36 /i255 /53 /33 /10 /5 /11 /33 /i255 /36 /i255 /53 /33 /11 /3 /4 /i255 /36 /i255 /53 /33 /11 /3 /37 /38 /2 /33 /i255 /36 /i255 /53 /5 /4 /10 /38 /32 /3 /4 /38 /i255 /36 /53 /5 /11 /32 /5 /10 /i255 /36 /i255 /53 /38 /10 /38 /32 /i255 /36 /i255 /53 /38 /4 /38 /i255 /36 /i255 /53 /38 /4 /39 /5 /11 /5 /48 /i255 /36 /i255 /42 /33 /37 /33 /i255 /36 /i255 /42 /5 /31 /33 /10 /33 /i255 /36 /i255 /54 /11 /33 /4 /50 /5 /i255 /36 /i255 /55 /34 /33 /32 /5 /11 /i255 /36 /i255 /55 /34 /1/35/33/2 /i255 /36 /i255 /56 /3 /31 /5 /11 /2 /3 /10 /5 /i255 /36 /i255 /30 /33 /32 /11 /33/35/5/4 /39 /38 /i255 /36 /i255 /30 /33 /4 /0 /5 /4 /3 /39 /38 /i255 /36 /i255 /30 /33 /4 /i255 /0 /5 /11 /4 /33 /11 /10 /3 /4 /38 /i255 /36 /i255 /30 /33 /4 /i255 /41 /3 /5 /50 /38 /i255 /36 /i255 /30 /33 /4 /i255 /44 /11 /33 /4 /32 /3 /2 /32 /38 /i255 /36 /i255 /30 /33 /4 /i255 /57 /38 /33 /58 /1 /3 /4 /i255 /36 /i255 /30 /33 /4 /i255 /51 /1 /3 /2 /i255 /54 /8 /3 /2 /37 /38 /i255 /36 /i255 /30 /33 /4 /i255 /53 /33 /39 /5 /38 /i255 /36 /i255 /30 /33 /4 /39 /33 /0 /33 /11 /8 /33 /11 /33 /i255 /36 /i255 /30 /33 /4 /39 /33 /i255 /40 /34 /33 /11 /33 /i255 /36 /i255 /30 /33 /4 /39 /33 /i255 /40 /11 /1 /59 /i255 /36 /i255 /30 /60 /33 /2 /39 /33 /i255 /36 /i255 /30 /3 /5 /11 /11 /33 /i255 /36 /i255 /30 /3 /2 /52 /3 /48 /38 /1 /i255 /36 /i255 /30 /38 /34 /33 /4 /38 /i255 /36 /i255 /30 /38 /4 /38/35/33/i255 /36 /i255 /30 /39 /33 /4 /3 /2 /34 /33 /1 /2 /i255 /36 /i255 /30 /1 /39 /39 /5 /11 /i255 /36 /i255 /61 /5 /60 /33/35/33/i255 /36 /61 /11 /3 /4 /3 /39 /48 /i255 /36 /i255 /61 /1 /34 /33 /11 /5 /i255 /36 /i255 /61 /1 /38 /34 /1/35/4/5 /i255 /36 /i255 /62 /5 /4 /39 /1 /11 /33 /i255 /36 /i255 /63 /38 /34 /38 /i255 /36 /i255 /63 /1 /8 /33 /62 /3 /5 /64 /i255 /49 /5 /48 /64 /38 /11 /10 /2
/62 /3 /5 /64 /i255 /40 /34 /33 /2 /2 /3 /65 /3 /32 /33 /39 /3 /38 /4 /2 /62 /3 /5 /64 /i255 /30 /1 /37 /37 /34 /3 /5 /11 /i255 /41 /3 /31 /5 /11 /2 /3 /39 /48 /i255 /47 /4 /65 /38 /11/35/33/39 /3 /38 /4 /66 /20 /25 /16 /67 /17 /i255 /68 /17 /69 /25 /16 /70 /16 /20 /15 /25 /16 /21 /18 /71/72 /68 /17 /69 /25 /16 /70 /16 /20 /15 /25 /16 /21 /18 /i255 /73 /74 /26/17/66 /26 /26 /75 /16 /20 /15 /25 /16 /21 /18 /i255 /76 /15 /25/17/77 /25 /15 /25 /78/71/77 /25 /15 /25 /78 /71 /i255 /76 /15 /25 /17 /28 /73 /16/22/17 /79/69 /21/22/73 /21 /30 /0 /80 /53 /3 /32 /11 /38/81/82 /83 /84 /82 /85 /84 /83 /82 /83/86/9 /37 /37 /11 /38 /31 /5/10/82/83 /84 /82 /85 /84 /83 /86 /i255 /87 /82 /88 /89 /90 /9/53/82 /83 /84 /82 /85 /84 /83 /82 /83/86/82/83 /84 /83 /91 /84 /83 /82 /83 /90 /68 /17 /69 /25 /16 /70 /16 /20 /15 /25 /16 /21 /18 /i255 /92 /16 /71 /25 /21 /69 /74/72 /68 /17 /69 /25 /16 /70 /16 /20 /15 /25 /16 /21 /18 /i255 /73 /74 /26/17/66 /26 /26 /75 /16 /20 /15 /25 /16 /21 /18 /i255 /76 /15 /25/17/77 /25 /15 /25 /78/71/77 /25 /15 /25 /78 /71 /i255 /76 /15 /25 /17 /28 /73 /16/22/17 /79/69 /21/22/73 /21 /30 /0 /80 /53 /3 /32 /11 /38/81/82 /85 /84 /87 /82 /84 /83 /82 /83/83/43 /93 /37 /3 /11 /5/10/82 /83 /84 /82 /85 /84 /83 /86 /i255 /87 /82 /88 /89 /90 /9/53/82 /94 /84 /83 /87 /84 /83 /82 /83/83/82/83 /84 /82 /85 /84 /83 /82 /83 /86 /30 /0 /80 /53 /3 /32 /11 /38/81/82 /83 /84 /82 /95 /84 /83 /82 /83/86/40 /33 /4 /32 /5 /34 /34 /5/10/82/83 /84 /82 /85 /84 /83 /86 /i255 /87 /82 /88 /87 /90 /9/53/i255 /i255 /0 /1 /2 /3 /4 /5 /4 /6 /7 /3 /4 /8 /9 /i255 /11 /12 /13/1/14 /13 /13 /15 /4 /6 /7 /3 /4 /8 /9 /i255 /16 /7 /3/1/17 /3 /7 /3 /18/19/17 /3 /7 /3 /18 /19 /i255 /16 /7 /3 /1 /20 /11 /4/21/1 /22/2 /8/21/11 /8 /23 /24 /25 /26 /27 /28 /29 /30/31/32 /33 /34 /32 /35 /34 /35 /32 /35/32/36 /37 /38 /27 /29 /39/40/32 /41 /34 /32 /42 /34 /35 /35 /i255 /42 /35 /44 /33 /45 /46/26/32 /33 /34 /32 /35 /34 /35 /32 /35/32/32/33 /34 /47 /32 /34 /35 /32 /35 /35 /23 /24 /25 /26 /27 /28 /29 /30/31/32 /47 /34 /32 /42 /34 /35 /32 /42/48/36 /37 /38 /27 /29 /39/40/32 /33 /34 /32 /42 /34 /35 /32 /i255 /42 /35 /44 /33 /49 /46/26/32 /47 /34 /32 /41 /34 /35 /32 /42/48/32/47 /34 /47 /42 /34 /35 /32 /35 /32 /23 /24 /25 /26 /27 /28 /29 /30/31/32 /47 /34 /32 /47 /34 /35 /32 /42/33/36 /37 /38 /27 /29 /39/40/32 /47 /34 /32 /47 /34 /42 /33 /i255 /42 /35 /44 /32 /32 /46/26/32 /47 /34 /32 /47 /34 /35 /32 /42/33/32/47 /34 /32 /41 /34 /35 /32 /42 /48 /50 /39 /51 /52 /29 /53 /i255 /51 /30 /i255/54/30/29 /55 /56 /39 /53 /51 /39 /29 /i255 /25 /34 /38 /57 /58 /39 /59 /34 /27 /53 /40 /39 /37 /60 /57 /59 /38 /37 /31/61 /29 /27 /53 /51 /i255 /51 /62 /27 /59 /i255 /61 /57 /58 /39 /i255 /63 /64 /3 /3 /13 /65 /20 /20 /66 /66 /66 /67 /5 /4 /19 /6 /7 /15 /67 /6 /7 /67 /68 /8 /69 /20 /70/i255 /i255 /63 /64 /3 /3 /13 /65 /20 /20 /66 /66 /66 /67 /71 /68 /19 /67 /6 /7 /67 /68 /8 /69 /20 /70/i255 /63 /64 /3 /3 /13 /65 /20 /20 /66 /66 /66 /67 /6 /7 /67 /68 /8 /69 /20 /70 /56 /30 /38 /72 /29 /27 /58 /62 /51 /i255 /73 /i255 /35 /32 /42 /41 /74 /35 /32 /35 /41 /i255 /23 /51 /57 /51 /39 /i255 /30 /75 /i255 /56 /57 /76 /27 /75 /30 /29 /53 /27 /57 /77 /2 /4 /69 /7 /6 /12 /i255 /77 /8 /15 /4 /6 /12 /i255 /63 /64 /3 /3 /13 /19 /65 /20 /20 /5 /4 /19 /6 /7 /15 /67 /6 /7 /67 /68 /8 /69 /20 /13 /2 /4 /69 /7 /6 /12 /78 /13 /8 /15 /4 /6 /12 /70

/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255/8/5/9 /10 /9 /2 /11 /i255 /12 /3 /5 /3 /13 /0 /14
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255/8/5/9 /10 /9 /2 /11 /i255 /15 /9 /16 /17 /18 /19 /20 /21
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /16 /22 /23 /12 /9 /6 /5 /10 /i255 /6 /9 /3 /23 /24 /25 /26 /24/27/28
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /16 /22 /23 /12 /9 /6 /5 /10 /i255 /12 /3 /5 /3 /13 /0 /14
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /16 /22 /23 /12 /9 /6 /5 /10 /i255 /15 /9 /16 /17 /18 /19 /20 /21
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /6 /13 /4 /3 /9 /29 /23 /i255 /30 /5 /3 /13 /18 /31 /18 /32 /33 /31 /34 /33 /18 /20
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /6 /1/8/16/5 /2 /23 /i255 /3 /23 /16 /13 /0 /1 /4 /16 /1 /4 /5 /3 /9 /1 /2
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /6 /4 /5 /29 /3 /i255 /10 /13 /11 /5 /6 /23 /0 /1 /2 /12 /35 /10 /3 /5 /2 /3 /36 /i255 /24 /2 /12 /16 /13 /6 /3 /1 /4 /i255 /37 /9 /13 /10 /30 /i255 /38 /1 /9 /10 /12 /i255/39/5/3 /13 /4 /9 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /6 /4 /5 /29 /3 /i255 /12 /2 /1 /40 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /6 /i255 /5 /3 /9 /1 /2 /i255 /13 /41 /16 /i255 /30 /5 /3 /13 /18 /31 /18 /42 /33 /31 /19 /33 /43 /31
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /30 /5 /3 /13 /i255 /30 /13 /5 /6 /3 /9 /44 /5 /3 /13 /30 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /30 /45 /5 /i255 /2 /5/8/13 /46/47/38/46/39 /14/27/48/i255/14 /38 /38/49/0/24 /14 /50 /28 /38 /51 /i255 /24/27/0/52 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /8 /2 /3 /9 /3 /10 /i255 /2 /11/12/13/8 /4 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /19 /20
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /23 /5 /24 /3 /i255 /2 /5/12/8 /25/11/24 /26/12/5/2 /27
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255/12/5/9 /23 /9 /2 /28 /i255 /5 /27 /27 /4 /8 /24 /24 /29 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /30 /26 /10 /24 /9 /6 /5 /23 /i255 /5 /27 /27 /4 /8 /24 /24 /21 /29 /31 /15 /i255 /32/33/20/20/34 /35 /20
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /30 /26 /10 /24 /9 /6 /5 /23 /i255 /5 /27 /27 /4 /8 /24 /24 /29 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /24 /1 /11 /4 /6 /8 /36/37/0/35
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255/38/6/i255 /6 /8 /4 /3 /i255 /27 /5 /3 /8 /29 /15 /29 /21 /39 /15 /22 /39 /15 /21
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255/38/6/i255 /8 /40 /30 /i255 /27 /5 /3 /8 /29 /15 /29 /22 /39 /15 /16 /39 /29 /21
/0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255/38/6/i255 /30 /1 /23 /9 /6 /10 /i255 /2 /11/12/13/8 /4 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255/38/6/i255 /24/8 /23 /8 /6 /3 /9 /1 /2 /19 /2 /24 /11 /4 /8 /27 /i255 /13 /10 /i255 /6 /5 /4 /4 /9 /8 /4 /0 /1 /2 /3 /4 /5 /6 /3 /1 /4 /i255 /23 /8 /28 /5 /23 /i255 /8 /2 /3 /9 /3 /10 /i255 /2 /5/12/8

/0/1/2/0/3 /4/5/6/i255/4 /2 /2/8/9/10 /4 /11 /12 /2 /13 /i255 /10/5/9/14 /9 /15 /16 /17 /18 /19 /20 /17 /15 /18 /i255/21/19/22 /23 /22 /16 /24 /i255 /19 /25 /25 /18 /26 /27 /27 /28 /29 /30 /31 /i255 /32/8/6/6/4 /33 /6
/9 /15 /16 /17 /18 /19 /20 /17 /15 /18 /i255/34/20/i255 /20 /19 /18 /18 /22 /26 /18 /0/35/27 /36/21/19/16 /25 /i255 /4 /27 /27 /15 /20 /22 /19 /17 /26 /27 /13 /i255 /10 /16 /20 /14 /9 /36 /26 /20 /37 /26 /25
/11 /26 /18/21/27/i255 /38 /i255 /9 /15 /16 /25 /22 /17 /22 /15 /16 /27 /39 /18 /22 /40 /19 /20 /41 /i255 /39 /15 /23 /22 /20 /41 /6/22/27 /20 /23 /19 /22/21/26/18
/5 /15 /16 /25 /22 /27 /20 /18 /22/21/22/16 /19 /17 /22 /15 /16 /i255 /5 /15 /17 /22 /20 /26 /4 /20 /20 /26 /27 /27 /22 /42 /22 /23 /22 /17 /41
/25 /22 /18 /14 /20 /19 /14 /24 /15 /40
/9 /15 /43 /41 /18 /22 /24 /36 /17 /i255 /29 /31 /29 /44 /i255 /2 /17 /19 /17 /26 /i255 /15 /45 /i255 /9 /19 /23 /22 /45 /15 /18 /16 /22 /19

← All documents from this meeting