CITY OF ANAHEIM
Provide Additional On-Call Materials Testing,
Deputy Inspection, and Environmental Engineering
& Science Services for the Construction of Capital
Improvement Projects
June 12, 2025

CONTACT
Ross Khiabani, PE, GE
Project Manager
(657) 221-2715
[email protected]

714.940.6300 | 800.424.9144 | fax: 714.940.4920 | 2401 East Katella Avenue, Suite 300, Anaheim. California 92806 | www.willdan.com

Cover Letter
June 12, 2025

City of Anaheim
Department of Public Works-Construction Services
2nd Floor Engineering Counter
200 S. Anaheim Boulevard, Suite 276
Anaheim, CA 92805
Attn: John Martin, Contract Administration

Subject: Proposal for Additional On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services for the Construction of Capital Improvement Projects

The City of Anaheim is seeking proposals from qualified and experienced professional firms to provide as-needed Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services. Willdan Engineering (Willdan) has assembled a team of highly qualified and deeply experienced individuals, led by our top discipline leaders, and is fully committed to the successful completion of assignments under this contract. Our firm has over 60 years of experience providing similar services to clients throughout California and the western United States.

Our firm’s strengths include the following:

Full-Service Testing Facilities: Willdan maintains a full-service soils and materials testing laboratory in Anaheim, approximately 10 minutes away from City Hall. Our laboratory is certified and/or accredited by the Division of State Architect (DSA), the City of Los Angeles, AASHTO Materials Reference Laboratory (AMRL), and Caltrans. We are well-versed in Caltrans’ requirements and have successfully completed over 100 audits.

Strong Project Manager and team. Ross Khiabani, PE, GE has more than 50 years of experience providing geotechnical engineering, material testing, and inspection services for a wide variety of projects, including schools, commercial, industrial, public works, and transportation for public and private agencies. Mr. Khiabani will be supported by a strong team, including Chris Baca, RCI, Director of Construction Management Services, Joe Ritchey as Material Testing and Inspection Lead, Alireza Kazem, PhD, EIT as Geotechnical Engineer, Craig Prentice, PG, CEG as Engineering Geology Lead, and Ramon Calbay as Laboratory Testing Lead.

Staffing Resources. Willdan has assembled a team of professionals committed to delivering top-quality service to the city. Willdan has more than 1,700 employees, including licensed engineers, program and construction managers, planners, and other skilled professionals. We can provide the city with experts in Geotechnical Engineering and Materials Testing as requested in the RFQ.

Willdan has enhanced our services with three (3) subcontractors that will assist our team with pavement coring, R- value testing, and asphalt testing. Build with PMC will be doing the pavement coring and traffic control, Geo-Logic Associates will be doing the R value testing, and Converse Consultants will provide Environmental Engineering.

In our years of specializing in providing services to public agencies, we have gained the knowledge, skills, and experience to deal with the coordination of effort, quality control, record keeping, and special care that public projects and assignments require. We are always mindful of and consistently succeed at attaining our clients’ goals of completing projects on time and within budget. We would be a proactive participant on the City’s team of consultants and are confident that our services are well suited to the needs of the City of Anaheim.

Contact Person for Inquiries Regarding Proposal Representative Authorized to Bind the Company Ross Khiabani, PE, GE
Project Manager
1515 South Sunkist Street, Street E
Anaheim, CA 92806
(657) 221-2715
[email protected]
Chris Baca, RCI
Director of Construction Management and Inspection
2401 E Katella Avenue, Suite 300
Anaheim, CA 92806
(562) 364-8198
[email protected]
We thank the City of Anaheim for the opportunity to submit our qualifications for on-call materials testing, inspection services, and environmental engineering. We look forward to continuing working with the City and forging a successful partnership. If you have any questions about our submittal, please contact our proposed Project Manager, Ross Khiabani, at the information above.

Respectfully submitted,

WILLDAN

Chris Baca,
Director of Construction Management Services

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

1 Scope of Services
Willdan’s geotechnical team will be led by Ross Khiabani, PE, GE and will be supported by a qualified and experienced team, including Willdan’s Director of Construction Management Services Chris Baca. Willdan is committed to providing the staffing and resources required to assist with the City’s geotechnical engineering and material testing services needs. The City can rest assured that our dedicated staff will be available and accessible to the City staff during normal business hours, within reasonable limitations for the duration of the project.

Willdan has built a reputation for productive client relationships. It will be important for us to develop a harmonious working relationship not only with the design team and with the construction personnel of the contractor, but also with the designated City technical professionals and administrative staff. Willdan will strive to maintain a harmonic and pleasant working relationship with everyone.

We envision our work to begin with an initial communication from the City’s Project Manager. During the initial or subsequent communications, we will make sure we fully understand the project needs and objectives. We will work with City staff to develop the work plan and a task-by-task budget and schedule for our services. A team of qualified support staff with appropriate expertise will be assigned to the project depending on the tasks assigned.

Our services will be performed in compliance with the professional standards established by the City and federal, state, and local guidelines.

The success of a project depends on the cooperation and teamwork of all parties involved, such as the Governing Authority, Infrastructure Master Planner, Program Manager, Project Architect, Project Structural Designer and Construction Manager. In the past several years, Willdan has built a reputation for productive client relationships.

Our work on each project will begin with the following steps listed in our flow chart below.

1. Willdan will work in close association with the City’s Project Manager to provide a clear understanding of each scope of work and communicate that information to our technical staff working in the field. Our work will begin with an initial communication from the City’s Project Manager. During the initial and subsequent communications, we will make sure that we fully understand the project needs and objectives.

2. We will work with City staff to develop the work plan based on the City’s approved QAP and a task-by-task budget and schedule for our services. Our services will be performed in conformance with the requirements, as set by applicable codes and regulations and other applicable ordinances and guidelines.

3. Our approach to providing services to the City is to assign qualified personnel to each phase of the project.

4. Reports will be reviewed by a geotechnical engineer and, if appropriate, a certified engineering geologist.

5. Preliminary reports and test results will be submitted to the appropriate parties within the timelines specified in the City’s QAP. Laboratory tests will be performed by a qualified/certified technician and field inspection/tests will be performed by technicians with experience in the type of project to which the technician is assigned. All test results will be logged.

6. The City will review the reports and make any changes before the final draft.

7. Willdan will provide all deliverables to the City for their archives.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

2 Quality Assurance/Control
Willdan recognizes the importance of quality control and its direct relationship to the success of a project. Our standard practice is to prepare a project specific Quality Control Plan as specified by Willdan’s Quality Assurance Manual. The primary mission of our Quality Control Plan is to provide staff with technical and managerial expertise to plan, organize, implement, and control the overall quality effort, thereby ensuring the completion of a quality project within the time and budget established. Throughout the course of a project and at the end of each task phase, the Project Manager and/or Principal-in-Charge will contact the City to get feedback on Willdan performance.

Willdan will perform all testing in accordance with the American Society for Testing and Materials (ASTM) Standards and/or California Test Methods as specified in the Caltrans “Manual of Testing” To maintain the completeness of documentation, our reports will present detailed descriptions of the samples used, the tests performed with these samples, the test conditions, equipment, and facilities used, and the results of such tests.

Budget and Schedule Control
It is likely that the City may often need our services on short notice and require tasks to be completed under a demanding schedule. We commit our team to respond to the review, design and construction needs of the City in a timely manner and to meet accelerated project schedules. Our Project Manager will keep track of the resources used to complete each task using weekly reports prepared using the Deltek T&E and IBM Cognos Software systems which track expenditures, budget status, and hours expended by task. The expenditure status and hours will be compared to the budgeted amount for quick identification of discrepancies. Each Willdan employee submits a timesheet every Friday and hours are logged in the Deltek T&E system by the following Monday, allowing ready monitoring of project status.

Our staff resources are coordinated on a weekly basis, providing the flexibility to manage the peaks and valleys of a given project. We have been able to manage multiple projects and meet project schedules without compromising the quality of our work. Our references can provide testimony about our services. We are confident that we have the staff and resources to meet the projected construction schedule. The management of Willdan is dedicated to the principles of technical excellence and professional quality. Members of the firm consistently strive to apply the strength and experience of the entire Willdan organization to achieve the most practical and effective solution to each project.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

3 Technical Approach and Understanding
In support of the RFQ, the Materials Testing, Inspection, and Environmental Engineering & Science Services should consider the requirements and Guidelines of the following Standards and Specifications:
 City of Anaheim
 Caltrans
 Greenbook, Standard Plans for Public Works
Construction
 American Public Works Association (APWA)
 American Water Works Association (AWWA)
As applicable, in addition to the above, we will perform our work in general accordance with the following documents:
 Most recently adopted Uniform Building Code and California Building Code  Seismic Hazards Mapping Act and Alquist-Priolo Earthquake Fault Zoning Act  ASTM guidelines relating to geology and geotechnical work have to do with laboratory testing and field procedures. All applicable ASTM guidelines will be enforced.  State Mining and Geology Board, General Guidelines for Reviewing Geological Reports.

Further detailed technical approaches are stated as follows:

The geotechnical report is the tool used to communicate the site conditions and design and construction recommendations to the project design and construction team. Site investigation for projects have the objective of providing specific information on subsurface soil, rock, and water conditions. Interpretation of the site investigation information, by a geotechnical engineer result in the design and construction recommendations and should be presented in a project geotechnical report. The importance of preparing an adequate geotechnical report cannot be overstressed. The information contained in this report is referred to often during the design period, construction period, and frequently after completion of the project (resolving claims). Therefore, the report should be clear, concise, and accurate. Both an adequate site investigation and a comprehensive geotechnical report are necessary to construct a safe, cost-effective project.

While the geotechnical report content will vary by project type and size, all geotechnical reports should contain basic essential information, including:
 Summary of all subsurface exploration data, including subsurface soil profile, exploration logs, laboratory or in situ test results, and ground water information.
 Interpretation and analysis of the subsurface data.
 Specific engineering recommendations for design.
 Discussion of conditions for solution of anticipated problems; and  Recommended geotechnical special provisions.

As applicable, in addition to the above, we will perform our work in general accordance with the following documents:
 Most recently adopted Uniform Building Code and California Building Code  Seismic Hazards Mapping Act and Alquist-Priolo Earthquake Fault Zoning Act  California Geological Survey (CGS) Notes:
• Note 41 - Guidelines for Reviewing Geologic Reports
• Note 48 - Checklists for the Review of Geologic/Seismic Reports for California Public Schools, Hospitals, and Essential Services Buildings
• Note 49 - Guidelines for Evaluating the Hazard of Surface Fault Rupture Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

4  California Division of Mines and Geology Special Publication 117, Guidelines for Evaluating and Mitigating Seismic Hazards in California
 Southern California Earthquake Center, Recommended Procedures for Implementation of DMG Special Publication 117, Guidelines for Analyzing and Mitigating Liquefaction in California  ASTM guidelines relating to geology and geotechnical work have to do with laboratory testing and field procedures. All applicable ASTM guidelines will be enforced.  State Mining and Geology Board, General Guidelines for Reviewing Geological Reports.

To accomplish the scope of services and satisfy the requirements of the projects, we will provide the services as follows.

Review of the Existing Information

1. Conduct a review of available geotechnical and geological information from previous investigations by others, public records, our in-house records/database on past work in the vicinity of the Project limits and any other readily available information.

2. Review the Preliminary Infiltration Investigation report for Norwalk City Park prepared by NorCal Engineering dated December 1, 2016.

3. Review of the existing information may include reviews of the project documents prior to planning phase, if requested.

Geotechnical Investigation
Geotechnical investigation would best accomplish by considering following stages:

1. Pre-Drilling Activities: Pre-drilling activities are conducted primarily for the purposes of data gathering and safety. During the stage of data gathering, the following will be performed:
• Site Visit: we will have a site visit to observe the topography and visualize the proposed improvements at the project site. At the site, we will conduct limited surficial geologic mapping to collect preliminary soil type information that may be useful in our evaluation. • Research and Review: The goal of this task is to collect existing relevant subsurface information that is available for the area. The information includes geologic maps by the California Geologic Survey (formerly the California Division of Mines and Geology) and USGS, and boring logs/Log-of- Test-Borings sheets for the existing structures to determine soil type and strength, groundwater depth and any unusual subsurface conditions that may impact this project. The collected information and all documents provided by the City will be reviewed and used in our project planning.
• Drilling Permit and Utility Clearance: A permit application regarding the proposed filed borings will be submitted to the County of Los Angeles prior to field drilling. We will notify DigAlert to obtain underground utility clearance.

2. Drilling and Sampling Methods
• Drilling/Coring and Sampling: We will conduct the subsurface exploration as needed. Prior to conducting the field exploration, an exploratory boring location plan will be developed and provided for review. The boring location plan will also be used to apply for encroachment permits. The exploratory borings will be drilled using appropriate equipment which may be a truck mounted drill rig advancing hollow-stem or solid-flight augers, an air-rotary rig, or a mud rotary rig. If shallow groundwater is anticipated, a mud rotary rig will be used for drilling. Bulk and relatively undisturbed ring samples will be collected for laboratory testing.

Cone Penetration Test (CPT) soundings may also be advanced at the site. These soundings may be standalone, if site conditions and project needs so warrant, or done in conjunction with borings. The CPT will provide a continuous stratigraphy at each location. The subsurface information obtained from CPT will also be used to derive geotechnical parameters such as shear strength, relative density Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

5 stress history, and equivalent blow counts. If both CPTs and borings are done, data from boring logs will be used to refine the interpretation of soil parameters from CPT data. This will allow better definition of subsurface conditions across the site and will supplement the results of laboratory testing done on soil samples collected from borings. The CPT data will also be extremely useful in evaluating liquefaction potential and earthquake-induced settlement. If work is carried out on an active site, we will work with the District’s staff to minimize disruptions to other site activities, and complete field work within schedule without causing any delays to other operations and we will work closely with the District’s staff to coordinate activities with other public agencies or private entities that may have jurisdiction at the site.

For field percolation tests to determine the infiltration characteristic of the on-site soils, the 8-inch diameter boring is lined with 3-inch diameter perforated PVC pipes surrounded by gravel filter packs.

The hole is presoaked to provide an equilibrium condition prior to recording the time and drop in water level. The water level will be monitored for about 20 minutes, with measurements taken every twenty (20) minutes. The measured infiltration rates will be reduced using the reduction factors addressed in LID manual (GS200.2, 2017) to determine the design values.

After completion of exploratory drilling, logging, and sampling operations, boreholes will be backfilled with a mixture of cement and slurry. The soil cuttings retrieved during field drilling will be stored in soil drums and disposed of per CA State regulation.

Geotechnical Laboratory Testing
The field boring logs will be reviewed and analyzed to select representative bulk and ring samples for laboratory testing. Results of the laboratory tests will be used for engineering analyses to develop design and construction recommendations for the proposed improvements. The following soil tests are envisioned for this Project:
 In-place moisture content and dry density determination tests for each undisturbed sample.  Atterberg Limits tests for plasticity determination and soil classification.  Sieve analyses for grain size distribution and soil classification.  Direct shear tests on undisturbed samples and, if appropriate, on remolded samples to determine the shear strength of the materials.
 Consolidation tests to determine the compressibility of the materials.  Expansion Index tests to determine the expansion potential of soils.  Compaction tests for use in preparing earthwork recommendations.  Stabilometer (R-value) tests for use in developing paving recommendations.  Corrosion tests to determine corrosion potential of the soils.

All tests will be conducted in accordance with Caltrans Test Methods or American Society of Testing and Materials (ASTM) Standards or Caltrans test methods (CTM).

Geotechnical Engineering Analyses
Results obtained from the field exploration and laboratory tests will be used to develop idealized subsurface profiles and define soil parameters for seismic study and geotechnical design. The seismic study will include the following items:
 Active faults and peak bedrock accelerations in accordance with CBC.  Acceleration response spectra (ARS) curves in accordance with Caltrans procedure.  Faults rupture evaluation.
 Liquefaction evaluation, including recommendations for mitigation.  Geotechnical design will be performed based on the approved preliminary plans. The following analyses are anticipated for this Project:
• Determination of soil conditions.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

6 • Determination of axial/bearing and lateral capacities for foundations. • Lateral earth pressures.
• Static and pseudo-static slope stability.
• Evaluation of dynamic and static settlement.
• Evaluation of pavement structural sections.
• Corrosion potential of on-site soil and recommendations for the buried utilities and drainage devices.
• Recommendations on earthwork.

Report Preparation
We will provide a geotechnical report to meet the requirements of submittals. The geotechnical report will include:
 Results of the subsurface explorations and laboratory tests, with a description of the soil or bedrock and groundwater conditions encountered.
 Recommendations for design of foundations to be used for support of the proposed structure, including allowable increases for wind or seismic loads.
 Estimated settlements for the anticipated loadings.
 Results of seismic assessment.
 Recommendations regarding lateral resistance of foundations, including moment versus depth for pile foundations at allowable and ultimate capacity, if needed.  Recommendations for design of retaining walls.
 Recommendations for earthwork, including site preparation, excavation, and the placing of any required compacted fill.
 Recommendations for design of asphalt.
 Results of the corrosion study.

The following graphics will be included in the reports:
 A vicinity map showing the location of the site.
 A plot plan showing the project limits and the boring locations.  Description of the field exploration, including field testing procedures and laboratory testing procedures.  A log of the exploratory boring depicting the changes encountered in the soil strata by elevation and depth below ground surface together with a description and classification of each soil stratum. The depth to ground water will also be indicated.
 Results of the CPTs, and/or SPTs.
 Plots and tables presenting the results of the laboratory tests.  Plots and tables presenting the results of the field percolation tests.

We will provide a review of the construction plans and specification for conformance of the recommendations presented in the geotechnical report.

Geotechnical and Materials Testing

1. Attend meetings, as needed, with project team.

2. Review existing geotechnical reports and project plans and specifications.

3. Observe and test during clearing and grubbing, grading, shoring installation, foundation excavation, site utility trench backfilling, and subgrade preparation.

4. Perform laboratory testing.

5. Provide continuous soils engineering support during construction.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

7 6. Provide certified reinforced concrete inspector during reinforcing steel placement and all structural concrete placement.

7. Verify compliance with approved project plans, specifications, and applicable code requirements.

8. Provide a qualified technician for AC batch plant inspection and/or AC placement.

9. Provide a qualified soil technician to observe and test earthworks and compaction.

10. Provide a certified concrete inspector for batch plant inspection, verification, and sampling, as needed, during Portland Cement Concrete production.

11. Sample and test concrete for compressive strength.

12. Provide certified reinforced concrete inspector during placement of any epoxy/anchors and screw anchor placement.

13. Inspect placement of any epoxy/anchors and screw anchor placement for compliance with plans and specifications.

14. Monitor placement of any epoxy/anchors and screw anchor placement.

15. Provide qualified technician as required for concrete placement and as inspector backup for large or elevated pours and torque testing.

16. Sample and test concrete/for slump, temperature, compressive strength, and sampling rebar for testing, if required.

17. Provide a certified masonry inspector to monitor and inspect placement of CMU block. Inspector will verify that all masonry units are placed per approved plans and specifications, and applicable building code requirements. Observe the mixing and placement of mortar and placement of grout. Observe the placement of embeds, bond beams and reinforcing steel for compliance with the plans and specifications. Sample and test mortar and grout for compressive strength.

18. Provide a certified structural steel welding and high strength bolting inspector to observe all phases of structural steel assembly/ construction. Review welder and material certifications prior to field welding.

Observe and/or test all bolted and welded connections per approved plans/specifications and applicable building code requirements.

19. Provide a certified commercial building inspector, for periodic inspection of lumber material verification, plywood shear wall nailing, plywood roof sheathing / nailing and seismic hardware installation for compliance per approved plans, specifications, and applicable building code requirements.

20. Provide engineering support, inspector/technician coordination, dispatch, material engineering review, test reporting, QA/QC, and administrative support services.

21. Submit reports/updates of ongoing tests; i.e., seven-day and off-schedule breaks.

22. Submit final report of completed laboratory tests; i.e., 28-day results for concrete.

23. Submit – for City review – daily field-testing and inspection reports indicating information pertinent to inspections performed and compliance/non-compliance with project documents and applicable codes.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

8 Proposed Subcontractors
Although Willdan can provide most of the requested services in-house, we have teamed up with three subcontractors. These additional team members will act on behalf of Willdan to provide the following services:

Services to be Provided Subconsultant
Pavement Coring & Traffic Control PMC, Inc.

Laboratory Soil Testing – R value Test Geo-Logic Associates Environmental Engineering and Science Services Converse Consultants Anticipated Subcontractors
Build with PMC (PMC) is an industrial construction company founded in June 1980. Its quality workmanship provides customers with a timely, cost-effective, safe, and clean job.

PMC performs the work professionally, from conception through project completion, doing all that is possible to make each project run smoothly for our customers. PMC specializes in Asphalt and Concrete Corroding, including temporary traffic control for fieldwork. PMC will provide Pavement Coring & Traffic Control for Willdan on this on-call contract.

Geo-Logic Associates (GLA) is an employee-owned multidisciplinary civil, environmental, geologic, and geotechnical consulting firm established in 1991. GLA employs over 250 highly experienced professionals located throughout 26 U.S. office locations as well as an office in Lima, Peru. GLA is a group of over 250 well-qualified and seasoned professionals providing a full range of services from planning to design and construction. GLA is committed to quality service at competitive prices and is known for providing clients with creative, cost- saving solutions to address their most complex engineering and construction challenges.

GLA's team members take pride in providing a responsive, high-quality work product and have proven their innovative ability to utilize problem-solving techniques to solve even the most complex issues our clients face successfully. Built with over 26 years of experience, GLA has a strong reputation for performing project work on schedule and under budget, as evidenced by the high rate of repeat and direct-assign work. Geologic will perform R-value testing for Willdan on this on-call contract.

Converse Consultants provide Phase I and II Environmental Site Assessments; Preliminary Endangerment Assessments; Asbestos, Lead-base Paint, and Mold surveys and monitoring; Third Party Reviews and Consultation; Project Management; and Hazardous Material Audits, SCAQMD Permitting, Supervising Hazardous Material Pickups, and Maintaining Hazardous Materials Databases. Additional services include Remedial Action Workplans (as well as overseeing the implementation of those workplans); the development and implementation of Stormwater Pollution Prevention Plans and related documents; and field experience relating to environmental investigations and remediation includes the collection of soil, soil vapor, ambient air, and groundwater samples, installation of groundwater and soil vapor monitoring wells, remedial extraction and injection wells, preparation of boring logs in accordance with Unified Soil Classification System methods, waste stream management, and evaluation of Best Management Practices (BMPs) at construction sites.

Converse Consultants
717 S. Myrtle Ave.

Monrovia, CA 91016
Mr. Norman S. Eke
(626) 807-3407
[email protected]
Lam Dang
(714) 630-5855
[email protected]
Robert Kelley
(562) 755-1634
[email protected]

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

9 Proposed Personnel
Organizational Chart

Location of Lab and Field Offices
Willdan’s lab is conveniently located 3.3 miles from Anaheim City Hall at 1515 Sunkist Ave, Anaheim, CA 92806.

Willdan’s headquarters is also located in Anaheim at 2401 E Katella Ave, #300, Anaheim, CA 92806.

Proposed Key Personnel
Key personnel will be available to the extent proposed for the duration of the services and an acknowledgement that no person designated as key personnel shall be removed or replaced without the prior written concurrence of the City. Willdan has provided brief resumes in the Appendix as requested by the City.

Key Staff Role
Ross Khiabani, PE, GE Project Manager
Chris Baca Director of Construction Management Services Joe Ritchey Material Testing Operations Lead
Alireza Kazem, PhD, EIT Field Geotechnical Engineering
Ramon Calbay Laboratory Testing

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

10 References
Willdan has provided the following three (3) recent references. Willdan is pleased to provide additional references at the request of the City.

On-Call Geotechnical and Material Special Inspection and Testing Services Client Contact
City of Diamond Bar
21810 Copley Drive
Diamond Bar, CA 91765
Vivian Chen
Public Works Engineer
(909)839-7038
[email protected]
Role: Prime Consultant
Services
Provided:
 Geotechnical Services
 Material Testing
 Specialty Inspection & Testing
Personnel:
 Ross Khiabani – Supervising Engineer
 Joe Ritchey – Supervisor
 Ramon Calbay – Laboratory Testing
 Craig Prentice – Engineering Geology
 Mike Corral – Field Technician
 Harrison Chandler – Soil Inspector
 Building with PMC (subconsultant)
 Geo-Logic Associates (subconsultant)
 Sequoia Consultants (subconsultant)
Approximate dates of the beginning and completion of the project phases, such as studies, planning, design, and construction. 2003 – Ongoing Willdan has provided geotechnical and materials testing and inspection services for rehabilitation of the streets within the City, including acting as City’s Geotechnical Reviewer for Public Works department. Our services included observation and testing of mill and overlay, reconstruction of pavement section including aggregate base (AB) and asphalt concrete (AC) layers, as well as cold central plant recycling (CCPR) and overlay. As the reviewer for the City, Willdan has been reviewing the developers submitted soils report for all the new projects.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

11 On-Call Construction Management and Inspection Services Client Contact
City of Downey
11111 Brookshire Avenue
Downey, CA 90241
Lorena Powell
Senior Civil Engineer
(562) 904-7110
[email protected]
Role: Prime Consultant
Services
Provided:
 Construction Management
 Geotechnical Services
 Specialty Inspection & Testing
 Material Testing
 Construction Inspection
Personnel:
 Ross Khiabani – Supervising Engineer
 Chris Baca – Principal-In-Charge
 Joe Ritchey – Supervisor
 Ramon Calbay – Laboratory Testing
 Mike Corral – Field Technician
 Dwayne Mozden – Field Tech/Inspector
 Justin Parent – Field Tech/Inspector
 Harrison Chandler – Soil Inspector
 Tony Pacheco – Field Inspector
 Brent Jablonowski – Field Inspector
 Amy Rodriguez – Field Inspector
 Saul Martinez – Field Inspector
 Samual Moctezuma – Field Inspector
 Miguel Lopez -Soil Inspector
 Building with PMC (subconsultant)
 Geo-Logic Associates (subconsultant)
 Sequoia Consultants (subconsultant)
Approximate dates of the beginning and completion of the project phases, such as studies, planning, design, and construction. 2018 – Ongoing Willdan has provided on call construction management and inspection services to the City of Downey since 2018 and has partnered with the City of Downey often over the past 25 years. Mr. Mike Bustos is our Project Manager for the City of Downey contract. Willdan provides construction
inspection and soils and materials testing services and construction management services.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

12 Geotechnical and Material Special Inspection and Testing Services Client Contact
City of Paramount
505 South Garey Avenue
Pomona, CA 91766
Matt Pilarz
Principal Civil Engineer
(909) 620-3652
[email protected]
Role: Prime Consultant
Services
Provided:
 Geotechnical Services
 Material Testing
 Specialty Inspection & Testing
Personnel:
 Ross Khiabani – Supervising Engineer
 Chris Baca – Principal-In-Charge
 Joe Ritchey – Supervisor
 Joseph Barr – Geotechnical Engineering
 Ramon Calbay – Laboratory Testing
 Mike Corral – Field Technician
 Dwayne Mozden – Field Tech/Inspector
 Justin Parent – Field Tech/Inspector
 Harrison Chandler – Soil Inspector
 Brent Jablonowski – Field Inspector
 Samual Moctezuma – Field Inspector
 Miguel Lopez -Soil Inspector
 Building with PMC (subconsultant)
 Geo-Logic Associates (subconsultant)
 Sequoia Consultants (subconsultant)
Approximate dates of the beginning and completion of the project phases, such as studies, planning, design, and construction. 2014 – Ongoing Willdan has been providing geotechnical and material special inspection and testing services during the construction of the City’s projects. Our services included observation and testing of subgrade preparation and grading activities; inspection, sampling and testing of concrete and reinforcement;
performing required laboratory testing of construction
material; and providing quality control for the construction.

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

13 Municipalities Served Within the Past 5 Years
Client
Geotechnical
Engineering
Feasibility
Studies
Field Investigations
& Surveys
Material
Testing
Geotechnical
Engineering
City of Bell     
City of Brea     
City of Calabasas     
City of Diamond Bar     
City of Downey     
City of El Monte     
City of Elk Grove   
City of Fillmore   
City of Grand Terrace     
City of Highland     
City of Inglewood     
City of La Puente     
City of Laguna Niguel    
City of Los Alamitos     
City of Lynwood     
City of Moreno Beach     
City of Newport Beach   
City of Paramount     
City of Placentia     
City of Pomona     
City of Rancho Palos Verdes     
City of Rialto     
City of Ridgecrest     
City of Rolling Hills     
City of Rolling Hills Estates     
City of Rosemead     
City of San Bernardino     
City of Santa Ana     
City of Santa Monica     
City of Santa Paula   
City of South Gate     
City of Thousand Oaks     
City of Westlake Village     
City of Yorba Linda     
County of Orange     
County of San Bernardino     
Emerald Bay Service District  

Proposal for On-Call Materials Testing, Deputy Inspection, Environmental Engineering, and Science Services

14 Appendix – Certifications and Resumes

Ross Khiabani, PE, GE
Project Manager
Ross Khiabani has more than 40 years of professional experience in performing diversified geotechnical assignments involving soil mechanics and foundation engineering, soil stabilization, landslide analysis and stabilization, settlement evaluations, liquefaction studies, slope stability analyses, laboratory testing, and inspection services during construction operations. His vast experience includes providing engineering services for commercial, industrial, institutional, ports and harbors, public works, transportation (including major bridges, local roads, freeways and toll roads) and water and wastewater facilities projects. This broad base of experience has given him a unique insight into local geotechnical and seismic conditions, and construction processes. He has kept in close communication with local, city, county, and state reviewers and is familiar with governing codes and requirements.

Relevant Project Experience
Fletcher Avenue Pavement Design-South Pasadena, CA, Civil Source. Project Manager.

Willdan was retained to provide geotechnical for the pavement design study for the Fletcher Avenue (Huntington Drive to Alhambra Road), City of South Pasadena, CA.

Comanche Creek Bridge-Chino, CA, Mt Hall Associates. Project Manager. Geotechnical Engineering Services, foundation design for prefabricated steel bridge across Comanche Creek, City of Chico, CA
Glendora Avenue & Temple Avenue Street Improvements, City of La Puente, CA.

Material Testing. Willdan Engineering was selected to provide project management, construction observation, material testing, funding administration, and federal labor compliance services for the Glendora and Temple Avenues Street Improvement Project.

The project included improvements on the following street segments: Glendora Avenue – Nelson Avenue to Temple Avenue; and Temple Avenue - Lanny Avenue to Greycliff Avenue. The project utilized Prop “C” and federal STPL funds Los Alamitos Boulevard Median Improvements, City of Los Alamitos, CA. Geotechnical.

Improvements on Los Alamitos Boulevard, between Cerritos Avenue and Katella Avenue, included raised median, pavement delineation, landscape and irrigation improvements, street lighting and traffic signal improvements at intersections with Florista Street and Sausalito Street. There were also minor traffic signal modifications at intersections with Katella Avenue and Cerritos Avenue. Willdan utilized the traffic study prepared by Hartzog & Crabill, Inc. The improvements were based on City’s four-Lane Alternative with Median.

Del Amo Boulevard Street Resurfacing, City of Lakewood, CA. Material Testing. Willdan was selected to provide construction management services including contract administration, construction observation, engineering support, utility coordination, material testing, Caltrans award and invoicing, and federal labor compliance. The project included Asphalt-Rubber Hot Mix (ARHM) overlay, cold milling, reconstruction of existing damaged AC pavement, concrete repairs, access curb ramps in compliance with the Americans with Disabilities Act (ADA) requirements, and installation of traffic signal loops and signing and striping on Del Amo Boulevard, between Downey Avenue and Clark Avenue, in the City of Lakewood. The project was federally funded utilizing STPL funds.

Pavement Rehabilitation #501 FY 2015 , City of Palm Springs, CA. Materials Testing Engineer. Willdan provided construction management, public works inspection, and material testing services for the City's $10 million citywide pavement rehabilitation project. The project involved pulverizing of the existing street sections, grading of the pulverized section, cement treatment, asphalt paving, ADA ramps, traffic markings, and

EDUCATION
MS, Geotechnical,
Engineering, California State
University, Long Beach
Geology, Pahlavi University,
Iran

PROFESSIONAL

CERTIFICATIONS
Civil Engineer, California No.
37156
Geotechnical Engineer,
California No. 2202
Civil Engineer, Nevada No.
11256
Civil Engineer, Arizona No.
27068

AFFILIATIONS
American Society of Civil
Engineers, Geotechnical
Group
Consulting Engineers and
Land Surveyors of California
Geotechnical Engineers
Association
American Public Works
Association
Council of Civil Engineers
and Land Surveyors

40+ YEARS OF EXPERIENCE

other appurtenant work for over 100 streets throughout the city.

Arterial Street Resurfacing, City of Paramount, CA. Geotechnical Engineer/Materials Testing. Willdan provided engineering design and construction observation for the resurfacing of arterial streets in the City of Paramount on Alondra Boulevard from Minnesota Avenue to Texaco Avenue/Gundry Avenue.

China Lake Boulevard Construction Management from Upjohn to Bowman Road, City of Ridgecrest, CA. Geotechnical/Material Testing. Construction management and inspection services for street rehabilitation on China Lake Blvd from Upjohn to Bowman Rd. Willdan will provide construction management, inspection, labor compliance, quality assurance materials testing, and federal funding compliance.

Hawthorne Boulevard Resurfacing, City of Hawthorne, CA. Geotechnical Engineer/Geotechnical Quality Assurance Manager responsible for a geotechnical investigation for resurfacing improvements involving asphalt-rubber hot mix overlay, ADA- compliant curb ramps, concrete repairs, signing, striping, and loop replacement. The scope of work included the preparation of federal paperwork, utility coordination, and pavement engineering.
159th Street, 160th Street, and 161st Street Improvements, City of Lawndale, CA.

Geotechnical Engineer/Geotechnical Quality Assurance Manage responsible for a geotechnical investigation for street improvements involving pavement engineering, utility coordination, topographic survey, and the specialty of an arborist. The project improvements included asphalt-rubber hot mix overlay, ADA-compliant curb ramps, concrete repairs, and minor signing and striping.

Chris Baca, RCI
Principal-in-Charge/Quality Assurance Manager
Chris Baca is responsible for directing and monitoring public works inspection services and overseeing construction inspection personnel. His experience includes construction management of capital improvement projects in areas of water systems, street improvements, park improvements, storm drains, sanitary sewers, asphalt resurfacing (including asphalt-rubber products), concrete paving, landscaped medians, and traffic signals. He is familiar with the inspection and contract administration of other federally funded projects in accordance with Caltrans Local Assistance Procedures Manual.

Prior to joining Willdan, he worked for a soils engineering firm conducting field inspections and performing laboratory testing.

Relevant Project Experience
Project No. 7310 Central Avenue and Tamarack Avenue Improvements, City of Brea, CA.

Project Manager/ Construction Manager responsible for overall project oversight and construction management. The project included widening the intersection of Tamarack Avenue and Central Avenue; installing a new traffic signal, landscaping, and street lights; construction drainage upgrades; and other appurtenant work.

Arcadia Downtown 2000 Revitalization, City of Arcadia, CA. Resident Inspector.

Responsible for the $7.2 million reconstruction of Huntington Drive from Santa Clara to Fifth Street. Mr. Baca was responsible for the inspection of the installation of 3,800 linear feet of 12-inch ductile iron water main 42- and 24-inch RCP storm drain; catch basin and miscellaneous storm drain structures; new sidewalk, curb and gutter; landscape medians, and sidewalk planter areas; ARHM and SAMI overlay; and street lighting. Construction administration services included: change orders; working day statements; correspondence, including letters and memorandums; and keeping track of installed quantities.

Walmart Construction Management & Inspection Services, City of Ridgecrest, CA.

Project Manager. Mr. Baca was responsible for the inspection scheduling. Willdan performed complete Construction Management, Geotechnical and Inspection services. In addition, we performed technical inspection services for onsite and offsite grading, street construction, drainage channel construction, drainage culvert construction, asphalt placement, concrete construction and earthwork activities. Provided geotechnical consultation, testing and verification services to meet City of Ridgecrest design standards and per Walmart approved plans.

Garvey Avenue from New Avenue to Rosemead Boulevard, City of Rosemead, CA.

Resident Inspector. Responsible for the $4.5 million reconstruction of Garvey Avenue from New Avenue to Rosemead Boulevard. Mr. Baca was responsible for inspection of:
installation of three concrete intersections; new traffic signals; reconstruction of the street section (subgrade, base, and asphalt); storm drain at San Gabriel Boulevard (54-inch); entry signs; landscaped medians; new curbs and sidewalk; and street lighting.

Base Line Safety Improvement Project, City of Highland, CA. Project Manager. Willdan provided construction management, public works inspection, labor compliance, Caltrans invoicing, and material testing services for the City of Highland's Base Line Street Rehabilitaion Project between Palm Avenue and the 210 Freeway. The project involved the installation of raised landscpaed medians, new decorative street lighting, repairs to damaged curb and gutter, decorative pavers in the intersections of Palm/Baseline and Church/Baseline, construction of a decorative crosswalk, and other appurtenat work.

EDUCATION
BS, Public Administration,
California State University,
Fullerton
Public Works Inspection,
California State University,
Los Angeles Extension
Asphalt Paving, Contract
Administration and Change
Orders for Federally Funded
Projects Seminars
Inspection Principles, Public
Contact, Slurry Seal, and
Traffic Signal Inspection and
Design Seminars
Caltrans Resident Engineer
Academy

PROFESSIONAL

CERTIFICATIONS
Registered Construction
Inspector, Division IV, Public
Works, California No. 4161
Registered Construction
Inspector, Division I,
Engineering, California No.
5161
36 YEARS OF EXPERIENCE

221st Parking Lot Design, City of Hawaiian Gardens, CA. Responsible for overseeing construction observation of this project which involved providing engineering design service to the City of Hawaiian Gardens for the design of the 221st parking lot. Willdan prepared plans, specifications and estimates (PS&E) for street, landscape, lighting, signing and striping plans. Other services provided by Willdan included topographic, boundary and construction surveys as well as contract observation, labor compliance and utility coordination.

Dillon Road Widening, City of Coachella, CA. Responsible for providing project management and inspection services for the project. The project involved the complete removal and replacement of the existing roadway between the Dillon Road Cutoff and the 10 Freeway; the construction of fully landscaped medians; the installation of new safety lighting, and other appurtenant work. Willdan provided full construction management, public works observation, construction staking, and material testing services.

Construction Management, Inspection, and Testing Services for FY 2008-2009 Water and Sewer Capital Improvement Program, City of Pomona, CA. Project Manager responsible for overall oversight and scheduling of construction administration and inspection services for installation of new water lines and appurtenant structures throughout the City of Pomona. Specifically, the projects will involve the installation of 8-inch to 12-inch ductile and PVC water line; fire hydrants, valves, and other appurtenant work. Willdan will provide construction management, labor compliance, geotechnical, and public works observation services.

Miro Way 140704 15-078, City of Rialto, CA. Project Manager. Willdan provided public works inspection for City's permitted project Miro Way Improvements, between Linden and Alder. The project involved asphalt overlay, street lighting, PCC improvements, and other appurtenant work.

Joseph M. Ritchey
Materials Testing & Inspection
Joseph Ritchey has a 40+-year construction background encompassing a multitude of trades and as a field superintendent. He manages and supervises material testing, construction inspection, and deployment of inspectors and technicians. His experience includes projects for numerous school districts, including Los Angeles, Glendale, Baldwin Park, Palmdale, San Gabriel, Tustin, and the West Los Angeles Community College District.

Mr. Ritchey also worked as an Assistant Inspector-of-Record servicing Fountain Valley Unified School District, West Los Angeles Community College, and Tustin Unified School District.

Relevant Project Experience
Solar Project 4160 Power Distribution- Coast Community College District, Costa Mesa, CA. Special Inspection and Testing. Geotechnical material testing and inspection services for the Solar Project 4160 Power Distribution at the Orange Coast College.

Golden West College Student Services Site Underground HVAC Piping-Huntinton Bech, CA. Special Inspection. Geotechnical material testing and inspection services for the Student Services site underground HVAC piping.

New Soccer Field Bellflower High School, Bellflower Unified School District, Lakewood, CA. Material Testing/Inspector. Geotechnical and material inspection and testing of the new soccer field at the Bellflower High School.

Bellflower High School Auto Shop Shelter, Bellflower Unified School District, Lakewood, CA. Material Testing/Inspector. Services consisted of geotechnical inspection and testing for soil compaction, and material testing and special inspection for the proposed shelter.

Tested concrete for compressive strength and concrete flatness testing on concrete slabs and decks to ensure concrete met the tolerance per the specifications.

Shade Structures, Bellflower Unified School District, Lakewood, CA. Material Testing/Inspector. Services consisted of geotechnical inspection and testing for soil compaction, and material testing and special inspection for the proposed shelter. Tested concrete for compressive strength and concrete flatness testing on concrete slabs and decks to ensure concrete met the tolerance per the specs. Shade structures at various sites.

Mayfair High School STEAM Center, Bellflower Unified School District, Lakewood, CA.

Material Testing/Inspector. Services consisted of geotechnical inspection and testing for soil compaction, and material testing and special inspection for erection of structural steel, structural steel welding, high strength bolting, concrete placement, CMU placement, concrete batch plant inspection, structural steel fabrication shop inspection, reinforcing steel fab shop tagging and sampling for testing. Tested concrete, masonry mortar and grout for compressive strength and concrete flatness testing on concrete slabs and decks to ensure concrete met the tolerance per the specifications.

Bellflower HS Track & Field and Stadium Upgrades, Bellflower Unified School District, Lakewood, CA. Material Testing/Inspector. Geotechnical and material inspection and testing services for the upgrades of the Track & Field and Stadium.

Craig Williams ES Covered Walk Replacement, Bellflower Unified School District, Lakewood, CA. Material Testing/Inspector. Geotechnical and material inspection and testing services for this project’s covered walk replacement.

EDUCATION
Coursework in inspection of
structural masonry,
reinforced concrete, post
tension concrete, and pre-
stressed concrete, Robert
Schiltz School of Inspection
Epoxy injection inspection: In
depth hands-on training,
Sika Seminar, Glendale
School District

40+ YEARS OF EXPERIENCE

Alireza Kazem, PhD, EIT
Geotechnical Engineer
Dr. Alireza Kazem has over 12 years of experience in geotechnical and earthquake engineering, complemented by a strong background in structural analysis and design. He has more than 7 years of experience in structural engineering and construction in Iran, with expertise in concrete and steel design in compliance with relevant codes and standards. From 2015 to 2022, Dr. Kazem served as a faculty member at California State University, Long Beach, and California State University, Fullerton, teaching a range of civil engineering courses. He also served as the Geotechnical Laboratory Supervisor at CSU Long Beach for over 5 years, where he instructed students in laboratory testing procedures in accordance with ASTM standards.

Dr. Kazem specializes in providing foundation design recommendations for shallow and deep foundations in transportation infrastructure, residential and commercial developments, and educational facilities. His expertise includes ground improvement techniques to mitigate soft soil conditions and liquefaction hazards. He brings strong leadership in geotechnical interpretation, engineering analysis, solution development, project management, and client coordination. Dr. Kazem has contributed to a wide range of engineering projects across the United States and Iran.

Relevant Project Experience
Boron Landfill – Edwards Air Force Base, California, U.S. Air Force. Project Engineer.

Performing geotechnical investigation and design of an evapotranspiration (ET) cover system for a 16,000-acre landfill. Scope included drilling and sampling 45 borings to 15 feet bgs, laboratory testing to characterize unsaturated soil properties, and analysis of 25+ years of precipitation records. Performed hydraulic conductivity modeling using the Van Genuchten-Mualem framework and SEEP/W(Bently) software. Work included model calibration, sensitivity analysis, and error evaluation to support cover design recommendations.

Balboa Sports Complex and Aquatic Facility (Olympic Prep) – Encino, California, City of Los Angeles GED. Project Engineer. Conducted geotechnical investigation for proposed pool, bathhouse, splash pad, and support structures. Performed drilling, soil sampling (SPT and ring), laboratory testing, engineering analysis, and prepared final report to support design and construction.

Street Improvements – Irwindale, California, City of Irwindale. Lead Geotechnical Engineer. Led geotechnical investigations for 10 different streets, including asphalt coring and subgrade sampling. Oversaw lab testing and analysis of asphalt and soil conditions.

Prepared reports for city submittal and served as the city’s representative during coordination with paving contractors and asphalt manufacturer such as All American Asphalt and Acome.

Historical Preservation Project – Modjeska Canyon, Silverado, California, Report to State of California. Lead Geotechnical Engineer. Performed site reconnaissance, slope stability analysis, and Foundation assessment of the historic Marilyn Monroe residence and adjacent structures. Evaluated a distressed masonry retaining wall on expansive clayey slope. Delivered engineering recommendations for slope remediation and preservation.

EDUCATION
PhD, Geotechnical
Engineering, California State
University, Long Beach
MS, Applied Mathematics
(in Engineering), Claremont
Graduate University
MS, Environmental
Engineering, Kharazmi
University, Iran
MS, Environmental
Engineering, Amirkabir
University of Technology,
Iran
BS, Civil Engineering, Tabriz
University, Iran

PROFESSIONAL

CERTIFICATIONS
Engineer in Training (EIT)
No. 160387
11 YEARS OF EXPERIENCE

Ramon Calbay
Laboratory Testing
Ramon Calbay has more than 45 years of experience with soils and materials selection, design, testing and quality control. Mr. Calbay has led the soils and materials testing programs for multiple highway and bridge construction projects. In addition, he has extensive experience of providing field observation and testing for pile installation, soil stabilization, settlement monitoring and mass grading operations. Mr. Calbay has also been involved in the design and control of asphalt and concrete mixes, production of road bases and filter mixes, and inspection of structural concrete, steel, and weldments. Mr.

Calbay has more than 32 years of experience in managing a full-service geotechnical testing laboratory.

Relevant Project Experience
Bellflower High School Auto Shop Shelter, Bellflower Unified School District, Lakewood, CA. Inspector. Services consisted of geotechnical inspection and testing for soil compaction, and material testing and special inspection for the proposed shelter. Tested concrete for compressive strength and concrete flatness testing on concrete slabs and decks to ensure concrete met the tolerance per the specs.

Shade Structures, Bellflower Unified School District, Lakewood, CA. Inspector. Services consisted of geotechnical inspection and testing for soil compaction, and material testing and special inspection for the proposed shelter. Tested concrete for compressive strength and concrete flatness testing on concrete slabs and decks to ensure concrete met the tolerance per the specs. Shade structures at various sites, Bellflower, CA.

Mayfair High School STEAM Center, Bellflower Unified School District, Lakewood, CA.

Inspector. Services consisted of geotechnical inspection and testing for soil compaction, and material testing and special inspection for erection of structural steel, structural steel welding, high strength bolting, concrete placement, CMU placement, concrete batch plant inspection, structural steel fab shop inspection, reinforcing steel fab shop tagging and sampling for testing. Tested concrete, masonry mortar and grout for compressive strength and concrete flatness testing on concrete slabs and decks to ensure concrete met the tolerance per the specs.

Bellflower HS Track & Field and Stadium Upgrades, Bellflower Unified School District, Lakewood, CA. Inspector. Geotechnical & Material Inspection & Testing Bellflower HS Track & Field and Stadium Upgrades.

EDUCATION
BS Civil Engineering, Mapua
Institute of Technology,
Manila, Philippines
Geotechnical Lab Testing,
Short Course, University of
Missouri, Rolla

PROFESSIONAL

CERTIFICATIONS
Construction Management,
Inspection & Testing for
Transportation Projects,
Caltrans Sponsored
Certification Program
Certified in Soils Laboratory
Testing, Caltrans
Nuclear Gauge Operator,
CPN International, Inc
Soils Special Inspector, ICC
Concrete Field and Strength
Testing Technician, ACI
Radiation Safety Officer

45 YEARS OF EXPERIENCE
12 Years with Willdan

City of Anaheim

DEPARTMENT OF PUBLIC WORKS

Page 1 of 2 ends

Anaheim City Hall
200 S. Anaheim Blvd.

Anaheim, CA 92805
TEL (714) 765-5176

www.anaheim.net
ADDENDUM NO. 1

TO THE REQUEST FOR PROPOSALS (RFP)

for the

ADDITIONAL ON-CALL MATERIALS TESTING, DEPUTY INSPECTION,

AND ENVIRONMENTAL ENGINEERING & SCIENCE SERVICES

June 3, 2025
I. GENERAL
The following changes, additions, or deletions shall be made as indicated, and all other conditions shall remain the same.

II. OPENGOV QUESTIONS AND ANSWERS

Q1 Our firm is currently on a pre-qualified list with the City of Anaheim to provide “On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services for the Construction of Capital Improvement Projects”. We qualified for this via an RFQ that was released in December of 2023 – the award was given in February of 2024. Is this new RFQ (see below) a continuation of the 2023 RFQ or is this a separate set of project opportunities?
A1 If your firm already has an agreement to provide on-call services to the City, then it is not required to submit under this RFP. This RFP only seeks to add firms to the term of the current list of on-call firms that the City has for these services. Note this question and answer will be memorialized in an addendum.

Q2 Hello, Our firm is on the current on-call list for Materials Testing, Inspections and Environmental services. We do have the capabilities to provide services for contracts with a CWA/PLA but have not been invited to provide quotes.

Please clarify if we need to submit to the RFP at this time. Thank You A2 If your firm already has an agreement to provide on-call services to the City, then it is not required to submit under this RFP. This RFP only seeks to add firms to the term of the current list of on-call firms that the City has for these services. Note this question and answer will be memorialized in an addendum.

Q3 We have a current contract with the City for On-Call Materials Testing, Deputy Inspection, and Environmental Engineering & Science Services for the Construction of Capital Improvement Projects that expires April 1, 2026. Do we need to submit a proposal at this time? Does this RFP replace that contract?
A3 If your firm already has an agreement to provide on-call services to the City, then it is not required to submit under this RFP. This RFP only seeks to add firms to the term of the current list of on-call firms that the City has for these services. Note this question and answer will be memorialized in an addendum.

City of Anaheim Request for Proposals (RFP) for AdditionalOn-Call Materials Testing Deputy Addendum No. 1,
Inspection, and Environmental Engineering & Science Services June 3, 2025

Page 2 of 2 ends

Q4
Approximately what percentage of the anticipated work under this contract will be subject to CWA union labor requirements?
A4 The City cannot designate a percentage as covered contract work depends on a number of factors. However, it is anticipated that there will be several covered projects during each fiscal year. Note this question and answer will be memorialized in an addendum.

Q5 Is the Fee Schedule subject to escalation?
A5 Per our sample agreement, the rate schedule may be submitted for adjustment by the consultant on the anniversary of the contract execution date each year. Note this question and answer will be memorialized in an addendum.

End of Addendum

The Prospective Consultant shall acknowledge receipt of all addenda by signing and enclosing each addendum form in its proposal submittal. Failure to do so may result in a rejection of his/her submittal.

Signature Print Name

Firm Name Date

Willdan Engineering
6/12/25
Chris Baca

2401 E. Katella Avenue, Suite 300
Anaheim, CA 92806

714.940.6300 | 800.424.9144 | F 714.940.4920
www.willdan.com