PROPOSAL
Submitted by NV5, Inc.
133 Technology Drive, Suite 200, Irvine, CA 92618
City of Anaheim Department of Public Works
Consulting Inspection Services
May 30, 2025

TABLE OF CONTENTS
Cover Letter 01
A. Firm Overview 03
B. Understanding of the Scope of Work 04

1. Approach/Ability to Administer the Agreement 04

2. Compliance with the CWA 04

3. Interfacing with City & CSD Staff 04

4. Additional Value with NV5 07
C. Project Team 08
Organization Chart 08

1. Staffing & Resource Management 08

2. Resumes of Key Personnel 09
D. Relevant Experience of the Team 42

1. Understanding of Range of Projects & Objectives 42

2. Technical Expertise to Provide Services 42

3. Relevant Projects & Similar Contracts 42
Additional Experience: Similar On-Call Contracts 47
E. Fee Schedule 48
F. Litigation & G. References 50
Acknowledgment of Contract Conditions 51
Acknowledgment of Addendum No. 1 52
Table of Contents
The NV5 staff is knowledgeable, courteous, and friendly and they truly care about their projects and the services they provide.

From Engineering Design to Inspection to Plan Check Services, the NV5 team can do it all, and we can always rely on them to deliver a quality product on time and within budget.
— Matthew Sinacori, Director of Public Works/City Engineer, City of Dana Point

CLIENT TESTIMONIAL
City of Anaheim Department of Public Works | Consulting Inspection Services NV5

COVER LETTER
133 Technology Drive, Suite 200 | Irvine, CA 92618 | www.nv5.com | Office: 949.585.0477 | Fax: 949.409.8182 PN: 2700225-0007674.00
May 30, 2025
Department of Public Works
Construction Services Division
Attn: Samantha Bahena, Contract Administration
200 S. Anaheim Boulevard, Suite 276
Anaheim, CA 92805
SUBJECT: Consulting Inspection Services
Dear Ms. Bahena and Selection Committee,
NV5, Inc. is excited to have the opportunity to provide Consulting Inspection Services to the City of Anaheim (City). Our firm has decades of experience providing construction support and a dedicated team of inspectors who will meet and exceed the City’s expectations.

Current Partnership: Our firm has done extensive work with the City’s Public Works Department and Public Utilities Department (APU) on capital improvement projects, including construction management and inspection for projects such as major water main/water valve replacements, rehabilitation for pressure-regulating stations, and street improvements, and engineering design for street rehabilitation and water mains. We currently have on-call contracts with the City to provide the following services:
• On-Call Engineering and Design Services (Civil Engineering and Structural Engineering) for the Public Works Department
• On-Call Consulting Support Services for the Construction Services Division • As-Needed Water Engineering Services for Anaheim Public Utilities Our existing relationship with the City allows us to operate with a working knowledge of your staff, processes and environment, enabling us to provide outstanding cost- and time-efficient services. We welcome the opportunity to continue serving the Department of Public Works with Consulting Inspection Services.

Relevant Experience: We have a proven track record of successfully providing construction inspection services to municipalities throughout Southern California, most of which have been repeat clients. Our team has provided similar on-call services to dozens of agencies, including the cities of Aliso Viejo, Bellflower, El Monte, Pico Rivera, Placentia, and Yorba Linda, just to name a few.

Proposed Team: NV5 offers the City a team of dedicated professionals with proven capability and expertise. We are proposing as Luanne Bean, PE, as Project Manager. Ms. Bean has more than 35 years of experience in the engineering, design, construction, and construction management of capital improvement projects. She is a familiar face in the Anaheim Public Utilities department, having managed multiple water and wastewater projects for the City. Ms. Bean will be joined by Assistant Project Manager India Woodruff and a team of dedicated construction inspectors available to meet the City’s needs.

Subconsultants: NV5 has a strong and successful working relationship with our subconsultant Project Partners, who we have worked with on numerous projects for various agencies throughout Southern California, including the City of Anaheim. Their experienced team of construction inspectors have worked with multiple municipalities and agencies and will provide additional support to NV5 to assure plenty of options are available as on-call projects are assigned.

Staffing Abilities: In addition to providing inspection services, NV5 offers in-house construction management, materials testing and special inspection, survey (drone capability), engineering design and many other professional services the City may need at a moment’s notice. NV5 has a deep bench of more than 4,000 professionals who can be made available to the City, and we will provide the personnel with the most relevant experience on a per project or task order basis.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 1

COVER LETTER
Established Local Presence: NV5 has had an established local office in Irvine for over 15 years. Our proximity to the City allows our team to mobilize quickly to visit job sites or City offices, or to respond to emergencies. NV5 has provided services to nearly every public agency in Orange County and our staff members are well-known and trusted in dozens of local municipalities. We are happy for the opportunity to continue providing services in this region to help shape the communities that thrive here.

Addendum Acknowledgment: We have received Addendum No. 1 dated May 22, 2025.

Proposal Authorization and Validity: This proposal has been signed by Jeffrey M. Cooper, PE, a company officer authorized to bind the firm. All information submitted with this proposal is true and correct.

NV5 looks forward to the opportunity to continue working with the City’s Public Works Department to help you achieve your goals and objectives. If you need further information, we may be reached by phone at 949.585.0477, or electronically at [email protected] and [email protected]. Thank you for your time and consideration.

Sincerely,
NV5, Inc.

COMPANY INFORMATION/CONTACT
Name: NV5, Inc.

Address: 133 Technology Drive, Suite 200,
Irvine, CA 92618
Telephone Number: (949) 585-0477
Email of Contact: [email protected]
Jeffrey M. Cooper, PE
EVP, Chief Operating Officer
Luanne Bean, PE
Project Manager
133 Technology Drive, Suite 200 | Irvine, CA 92618 | www.nv5.com | Office: 949.585.0477 | Fax: 949.409.8182 City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 2 Experienced Partner to Municipalities: We maintain an extensive history of working with various local agencies and municipalities. Throughout the course of supporting myriad public works capital improvement projects, our team has demonstrated an unparalleled ability to work well with local agency staff, project stakeholders, engineers and contractors.

We have successfully provided timely and cost-effective services, and we have acquired a keen understanding of local agency requirements, a critical element in the facilitation and resolution of project issues. We are excited about the opportunity to continue to serve the City of Anaheim and are committed to maintaining effective working relationships with your staff, relevant government agencies and project stakeholders.

With a demonstrated ability to address public concerns, we are experts in a broad range of governmental interface, public outreach and community involvement, and we are genuinely committed to public participation as a way of planning and completing projects. Our team routinely performs these services as part of our delivery of public works projects and regards them as a vital component to project success.

A. FIRM OVERVIEW
Firm Profile
NV5 is ready and qualified to provide Consulting Inspection Services for the City to support the Public Works Department’s Construction Services Division. NV5, Inc., a California corporation, has been providing engineering and consulting services to public and private sectors for more than 70 years, delivering solutions through six business verticals: Testing, Inspection and Consulting; Infrastructure; Utility Services; Environmental Health Sciences; Buildings and Program Management; and Geospatial Technology.

Corporate Organization: NV5 is a California Corporation led by an Executive Board including the following:
• Dickerson Wright, Executive
Chairman
• Ben Heraud, CEO
• Alexander A. Hockman, CEO of
Infrastructure
• Ed Codispoti, CFO
• Richard Tong, Co-Secretary and
Executive Vice President
• Kurt Allen, President of
Geospatial
• MaryJo O’Brien, Director,
Executive Vice President and
Chief Administrative Officer
• Jeffrey M. Cooper, PE, Executive
Vice President, Chief Operating
Officer
• William D Pruitt, Director
• François Tardan, Director
• Laurie Conner, Director
• Denise Dickins, Director
• Brian Freckmann, Director
Corporate Headquarters & Local Branch Offices: NV5 has more than 4,000 employees and 100 offices nationwide and abroad, including the following:
• Corporate Office: 200 South Park, Suite 350, Hollywood, FL 33021; Size: 33 employees • Irvine Office: 163 Technology Drive, Suite 100, Irvine, CA 92618; Size: 102 employees Office With Primary Responsibility: Our Irvine office will have the primary responsibility for the execution of these Consulting Inspection Services.

Account Manager: Luanne Bean, PE, 163 Technology Drive, Suite 100, Irvine, CA 92618. Office: 949.585.0477; Cell:
951.377.1566; Email: [email protected]
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 3 B. UNDERSTANDING OF THE SCOPE OF WORK
B1. Approach/Ability to Administer
the Agreement
NV5 is ready to work in collaboration with the City of
Anaheim’s Department of Public Works as a support
system for your construction inspection needs. Our
approach centers on responsiveness and representation.

When assigned to a project, our construction inspectors don’t just monitor the work — they represent the City’s interests in the field, ensuring that contractors adhere to plans and specifications, residents are informed and respected, and construction documentation is precise and audit-ready.

We understand that we will work under the direction of the Department’s Construction Services Division (CSD) staff, and will discuss project specifics in preliminary meetings.

Our inspectors will be available for a minimum of two (2) weeks before the project begins until a maximum of six (6) weeks after the project has been accepted. During each
project, our inspectors will adopt the contractor’s schedule and be available to work OT, nights, or weekends as
needed to keep the project on track and on schedule.

Our Project Manager or Assistant Project Manager will
be the point of contact for the CSD, with responsibilities including, but not limited to:
• Being accessible at all times during normal working
hours.
• Assigning inspectors to projects on an as-needed
basis.
• Administering personnel actions, including providing
a replacement (subject to CSD approval) if an
employee is on a leave of absence or if an employee’s
performance falls below expectations.
• Submitting resumes containing the qualifications and
experience of proposed inspectors.
• Responding to billing questions, insurance inquiries, and other administrative requests from the CSD.

B2. Compliance with the CWA
NV5 understands that many project assignments under
this on-call agreement will be work that is covered by
the City of Anaheim’s Community Workforce Agreement
(CWA) with the Los Angeles/Orange Counties Building
and Construction Trades Council and the Signatory
Craft Councils and Local Unions. NV5 has reviewed the
agreement and by submission of this proposal agrees to
comply with the terms of the CWA.

B3. Interfacing with City & CSD
Staff
Our approach to construction support services is
centered on our established policy of consistent and
effective employee oversight. The Project Manager will
closely monitor projects to verify that our inspectors
are performing within the guidelines of our established procedures, which are patterned after the Caltrans
Construction Manual.

Communication
Our construction support team will be the point of contact for all project correspondence and communication
between the City, the contractor, the design team
and other project stakeholders. We understand that
while under the direction of the Department of Public
Works Construction Services Division, we will work in
collaboration with both the Public Works Department and Public Utilities Department. We will help facilitate project communication between the branches and work with both
Public Works and Public Utilities for all project needs.

Our Project Manager and/or Assistant Project Manager
will be in constant communication with the City’s project managers, making sure they have updated information on
inspection status, as well as any on-site issues.

Staying Connected
Our staff is equipped with the technology to work efficiently and stay organized and connected with our clients. NV5
utilizes Microsoft Teams to efficiently collaborate; easily find, share and edit files in real time; meet virtually; and streamline workflows all on one single platform. NV5 is committed to maintaining a safe and productive workplace environment and has access to several virtual meeting
platforms in addition to Microsoft Teams.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 4 B. UNDERSTANDING OF THE SCOPE OF WORK
Schedule Control
Our construction support services team gives considerable attention to monitoring project schedules. We will
coordinate, review and make recommendations for
changes to the Critical Path Method (CPM) schedule
generated by the contractor. As changes or discrepancies occur between the CPM schedule and as-built conditions, the project schedule and cost estimates will be updated.

We will review the contractor’s schedule on a weekly basis and will maintain an as-built/working schedule to reflect as-built conditions to date.

Cost Control and Reporting
Cost control is a key element to successfully delivering a project and must be thoroughly integrated with other
control methods (scope change control, schedule control and quality control) to assure that the City receives full value for all funds earmarked for the project.

Quality Assurance and Quality Control
To assure compliance with the plans and specifications, we will implement a comprehensive quality assurance and quality control (QA/QC) program involving the following steps:
• We will perform a thorough review of the contract
documents. This responsibility will include the
following tasks:
○ Checking plans and specifications against
requirements that have been associated with issues
that occurred on similar jobs.
○ Comparing existing elevations, grades and details,
etc., shown on plans with those at the actual site.
○ Reporting all errors, omissions and deficiencies,
etc., to the City and engineering design team.
○ Keeping a marked-up set of plans and specifications
for quick reference.
○ Anticipating the Contractor’s operations by
reviewing the plans and specifications for each one
before it begins.
• Before start of construction, we will discuss with
the Contractor the definable features of work to
assure that documentation is complete, materials
are on hand and those who are to perform the work
understand the scope in its entirety.
• At the onset of the work, we will perform an initial
inspection to determine whether the Contractor
thoroughly understands and is capable of
accomplishing the work as specified.
• We will assure that the Contractor has an established safety program and that regular safety meetings are
conducted. We will also assure that the Contractor
meets all OSHA safety requirements.
• The construction inspector will perform follow-up
inspections on a daily basis for the purpose of
assuring that the controls established during the
initial inspection continue to provide work that
conforms to the contract requirements and all
applicable standards. Unsatisfactory workmanship,
materials and construction deficiencies will be
documented and reported for future identification and
traceability. Notices of non-compliance will be issued
to the Contractor and corrective and preventive action
will be taken to assure compliance with the contract
documents.
• We will conduct a monthly review of the as-built
drawings and assure that all items are considered in
the changes of the record drawings, including:
○ The size, type and location of existing and new utility lines
○ The layout and schematic drawings of electrical
circuits and piping
○ Verification of alignment and cross sections
○ Changes in the location of equipment, etc.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 5 B. UNDERSTANDING OF THE SCOPE OF WORK
• Finally, we will review and approve the as-built
drawings to complete the project turnover and begin
the warranty period.

Best Management Practices
Our construction support services team is well-versed
in National Pollutant Discharge Elimination System
(NPDES) requirements and experienced in implementing
best management practices. We will monitor the
implementation, maintenance and any required
modification of the approved Stormwater Pollution
Prevention Plan (SWPPP) and Water Quality Management
Plan (WQMP). In the event that the project specifications for developing the SWPPP or WQMP are inadequate
and cannot support the project needs or meet current
NPDES requirements, we will work closely with the design consultants to incorporate the required provisions into the project specifications to meet these goals. In addition, our team includes Qualified SWPPP Developers and Qualified
SWPPP Practitioners.

Mobility
Each member of our construction support services team
has access to a mobile office that includes a laptop,
internet/email access, mobile phone, mobile project files, digital cameras and other required materials. Our team
members are always available via mobile phone and email for easy access and continuous communication. NV5
provides insured vehicles for use by our team with the
proper flashing lights for safety on-site.

Scope of Work
Detailed and accurate inspection of the contractor’s
work is required for successful project completion. Our Resident Inspector will discuss any appropriate revisions to the contractor’s methods and coordinate with the CSD’s staff at all times to assure that work is progressing. Our Inspection services can include:
• Review and become familiar with all contract- and
construction-related documents, including plans
and specifications, traffic control plans, construction schedules, construction sequences and permitting
requirements, and present any concerns during
the pre-construction meeting. Attend subsequent
progress meetings to maintain communication
regarding issues or problems. For all projects,
maintain correspondence file and copy all contractor
communications to the CSD.
• Conduct a pre-construction photo/video survey of the
project site for verification that the site is returned to its original condition at the end of the construction
period.
• Perform daily field and quality control inspections
and measurements of the contractor’s work,
submittals, and construction materials to assure
all conform to the contract documents, City of
Anaheim codes and ordinances, “Greenbook”
Standard Specifications, Manual of Traffic Controls for Construction and Maintenance Work Zones, Caltrans
Construction Manual and all other applicable codes
and regulations. Health and safety measures will
be strictly enforced to maintain a safe construction
environment.
• Prepare daily reports, including daily progress photos, and detail work completed and/or other activities for
each day the contractor performs work. Daily reports
will be kept in a bound notebook and will state at a
minimum the date, weather conditions, traffic control
measures taken, progression of work, materials used,
and subcontractors, equipment and employees on
site, and major incidents/safety violations. NV5 will
submit digital photos at least weekly. We will also
prepare reports of deviations and non-conformance to
specifications and provide responses in accordance
with the specification requirements. Notices of Non-
Compliance will be immediately delivered to the
contractor for any and all deviations.
• We will monitor the establishment, maintenance and
any requirement modification of the approved SWPPP.

Should the provisions for developing the SWPPP in the
specifications be inadequate to support development
of a comprehensive and timely submitted stormwater
and erosion control plan necessary to comply with
current NPDES requirements, the NV5 team can work
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 6 B. UNDERSTANDING OF THE SCOPE OF WORK
closely with the design consultants to incorporate
the required language into the project specifications
suitable to meet these goals.
• Monitor utility coordination as set forth in the pre- construction meeting, reporting conflicts to the City
and recommending a course of action.
• Assure compliance to the coordination plan set forth
in the project startup to mitigate construction impacts to businesses and residents, altering and revising
the coordination plan as project demands require. As
part of the coordination plan, monitor site safety, and public safety, reporting any problems to the City.
• Assure implementation of a traffic control plan that is in accordance with the latest Work Area Traffic Control Handbook (WATCH) manual requirements, the City’s
requirements, and the contract documents.
• Assure compliance with funding requirements set
forth in the pre-construction phase, conducting field
employee interviews as necessary and reporting
resulting information to the City. Assure labor and
hours reported by contracts match the daily diary.

Provide complete measurements and calculations to
administer progress payments, assure contractors
submit certified payroll reports, and make
recommendation for payments.
• Compile detailed punch lists with CSD and City
staff, Consultants, and contractor. NV5 will conduct
a preliminary walk-through with the contractor to
assure there are no blatant issues and to generate
a preliminary punch list. After completion of the
preliminary punch-list items, prepare the final punch
list and coordinate with the contractor for item
completion. All punch lists generated will include
schedules for completion.
• Upon project completion, conduct final inspection,
closeout permits, including encroachment and
construction/excavation, and prepare and submit as-
built plans to City staff.

Funding Sources
NV5 realizes that the development of Federal- and State- funded projects requires a different kind of attention.

More and more, engineers are required to navigate their projects through the complex federal aid process involving pre-award audits, authorizations, and timely use of fund provisions. NV5’s experience with the regulatory agencies controlling these funding sources has afforded us the
opportunity to support our clients through the process of developing the day-to-day procedures required to secure authorization and reimbursement for federally funded
projects. This participation has put NV5 in a position to offer our clients an unparalleled level of understanding of the process required to comply with Federal and State requirements. Our work with local, state and federal
agencies keeps us in the forefront of current updates to policies and procedures allowing our clients to benefit from our regular involvement in the project delivery process.

B4. Additional Value with NV5
NV5’s staff has worked with a number of Southern
California cities under similar on-call agreements, and understands how to maintain continuity with internal
engineering teams. Whether reviewing a submittal,
responding to an RFI, meeting with residents, or
coordinating with a utility provider, our role is to reinforce the City’s standards and bring day-to-day value in the
field and in the office. With NV5, the City will gain not only technical depth, but also a collaborative mindset and a consistent, professional presence.

Communication with the City and other stakeholders is
a key component for NV5 to successfully provide high-
quality services to the City. Our goal is to exceed the City’s expectations and anticipate any conflicts that may arise.

Our team will Immediately document and notify the City
of any defects or hazardous conditions at the project
site(s) to mitigate any negative impacts, and health and safety measures will be strictly enforced. Inspectors will prepare reports of any deviations and non-conformance to specifications and provide responses in accordance with the specification requirements. Notices of Non-Compliance will be delivered immediately to the contractor for any and all deviations.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 7 C. PROJECT TEAM
Organization Chart
Our team of experts bring direct, relevant, successful and current experience working on projects of similar scope and complexity. We are equipped with the resources to provide the City with the requested consulting inspection services.

Shown below are team roles and responsibilities.

Mike Smith
Salvador Sanchez
Mark Puglisi
Ronald Morales
Ken Hicks
Mike Helma, LEED AP
Joe Chiquete
Bob Bean
Haykaz Aghajanian, PE
Duane Neyens
Dan Warren
Michael Irvin
David Caniglia
Jinan Mohammed
Tiffany Miles
Jennifer Peterson, PE,

CFM, QSD/P, CPESC,

LEED AP
John Keizer
PROJECT PARTNERS*
Bob Martinez
Ramnik Mungra
Bill Fernandez
Ken Higbee

PROJECT MANAGER/

CONSTRUCTION MANAGER

INSPECTORS
Jeffrey M. Cooper, PE

PRINCIPAL-IN-CHARGE
Luanne Bean, PE

ASSISTANT PROJECT

MANAGER/CONSTRUCTION

MANAGER
India Woodruff

OFFICE LOCATION
Our project managers
and inspectors will be
based in our Irvine office.

C1. Staffing & Resource Management
NV5 has extensive experience with as-needed contracts for inspection services. With our deep bench of over 4,000 employees across the company, over 500 of which are located in Southern California, we have the resources and capacity to adjust staffing to meet the City’s needs. Our dedicated project managers will manage incoming requests and mobilize the most appropriate inspector for the project, factoring in any required licenses the team member must hold. Each inspector will be dedicated to their assigned project 100% of the time. *Subconsultant
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 8 C. PROJECT TEAM
Project Experience
La Palma Avenue and Tustin Avenue Water Main Replacement at OCTA Railway Crossing
CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | ANAHEIM, CA Construction Manager. Ms. Bean oversaw the construction management and inspection services as the Construction Manager for this project. Metrolink, with the Orange County Transportation Authority, is expanding the Anaheim Canyon Metrolink Station, which includes the addition of a train track crossing at both La Palma Avenue and Tustin Avenue. The water main replacement project involves bore and jack installation of two new water mains underneath the OCTA railroad track in La Palma Avenue and Tustin Avenue, followed by the abandonment of the existing water mains that will now be too shallow and are not adequately reinforced to carry the load underneath the proposed train track. The project includes close coordination with the City, OCTA, Metrolink, Southern California Regional Rail Authority (SCRRA), among other agencies.

Rural Ridge Circle and Wilshire Avenue Water Main Replacement CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | ANAHEIM, CA Construction Manager. Ms. Bean served as the Construction Manager for this water main replacement project. The work consisted of two water main improvement areas:
the Rural Ridge area for 4,230 LF and the Wilshire-Pearl area for 2,750 LF of 8-inch to 15-inch potable water main, tie-ins to the existing potable water system, 142 1- and 2-inch water services and meters, existing main abandonment, and final street restoration. NV5 provided full Construction Management, Resident Engineering, and Inspection Services for this project, including coordination with the City, shop drawing and RFI review, change order analysis, and scheduling management.

Shady Lane, Olive Street and Country Hill Road Water Main Replacement CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | ANAHEIM, CA Construction Manager. Ms. Bean served as the Construction Manager for this water main replacement project. The project consisted of three independent areas of water main replacement within the sensitive residential areas of Country Hill Road, Olive Street, and Shady Lane. There was 3,960 LF of 12-inch, 10-inch, 8-inch and 6-inch C909 PVC and DIP waterline, line-stops, tie-ins, and new laterals and meter services installed with final street restoration. This additionally involved the standard water main replacements including: shutdowns; dewatering; excavation; placement of the

LUANNE BEAN, PE
Project Manager/Construction Manager
Ms. Bean has more than 35 years of experience in construction management, engineering and design. She’s experienced in projects ranging from water and wastewater projects to street and sidewalk rehabilitation to inspection and staff augmentation. As a Registered Civil Engineer and a former Class A General Engineering Contractor, Ms. Bean has seen construction from both sides of the fence.

Her technical skills include specialized structural analysis and design of large 600- MGD water treatment plants, pipelines up to 12 feet in diameter, mechanical analysis, the preparation of engineering plans, specifications and cost estimates, as well as construction management.

CONTACT INFO
[email protected]

EXPERIENCE
35 years

EDUCATION
M.S. Civil Engineering,
UCLA
B.S. Civil Engineering, Cal
Poly Pomona

LICENSES
Civil Engineer (CA)
No. 50129
Former Class A General
Engineering Contractor

REGISTRATIONS

FEMA OPS - I
HAZMAT First Responder/
Operations Level
DOT Offers of Bulk
and Non-Bulk HAZMAT
Packages
Nuclear Waste Safety
for Workers

TIME/EFFORT LEVEL FOR

THESE SERVICES
30-50%
C2. Resumes of Key Personnel
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 9 C. PROJECT TEAM
water mains, valves, and appurtenances; disinfection; and pressure testing followed by final street restoration under the direction of Anaheim Public Utilities and NV5’s Resident Engineering Services.

Cerritos Avenue & South Street Water Main Replacement
CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | ANAHEIM, CA Project Manager. Ms. Bean was responsible for the preparation the plans, specifications and cost estimates for the installation of new water mains at Cerritos Avenue and South Street. The project includes replacing existing 10-inch Cast Iron Pipe (CIP) and 6-inch Asbestos-Cement Pipe (ACP) with approximately 2,700 LF of new 12-inch Ductile Iron Pipe (DIP) from Brookhurst Street to Nutwood Street with four tie-in connections to existing water mains; replacing existing 8-inch CIP with approximately 350 LF of new 12-inch DIP from Disneyland Drive to Hazelwood Street with three tie-in connections to existing water mains; installing nine 12-inch gate valves and four fire hydrant assemblies on the new 12-inch mains; disconnecting and removing four hydrants on the existing mains; and replacing all existing lateral domestic water services on the existing 8- and 10-inch CIP and 6-inch ACP with new services on the 12-inch DIP.

Water Inspection and Project Management Services
CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | CITY OF ANAHEIM Project Manager. Ms. Bean is overseeing NV5’s full-time Staff Augmentation Water Inspection and Project Management Services for the City’s Public Utilities Department. As part of our contract with the City, NV5 is providing APUD with a full- time water inspector for citywide services to cover current staffing shortages. The inspector’s duties include construction support services for potable water projects, including water pipeline and facility improvements. In addition, NV5 has two full-time Project Managers placed at APUD through Project Partners Inc. The Project Managers work directly with City staff on current and future projects for the District.

Diversion Pipeline
CITY OF CULVER CITY | CULVER CITY, CA
Project Manager/Construction Manager. Ms. Bean oversaw the construction management, inspection and engineering services for the construction of sewer main diversion pipes reversing sewer flow via conventional cut and cover as well as trenchless jack and bore methods to abandon Mesmer and Overland Sewer Pump Stations. This also involved extensive permits and coordination with Caltrans, the City of Los Angeles, and the City of Culver City for these jack and bore pipelines underneath the I-405 and Route 90. The goal of the project was to divert flows from four of the City’s sewer pump stations to a new sewage pump station, Bankfield Station, which is another project in which NV5 provided construction management and inspection services during construction.

Sidewalk & Curb Ramp Reconstruction (Phases 2)
CITY OF EL MONTE | EL MONTE, CA
Construction Manager. Ms. Bean provided construction management services for Phase 2 of this federally assisted Sidewalk & Curb Ramp Reconstruction project. The scope of work includes parkway improvements along various local/ residential roadways within the City and includes the reconstruction of existing PCC sidewalks, curb and gutter, driveways, and ADA curb ramps; tree root pruning; and potential tree removal/replacement.

Heart of the Park Mass Grading
CITY OF IRVINE | IRVINE, CA
Project Manager. Ms. Bean is overseeing NV5’s construction inspection services for the Heart of the Park Mass Grading project as a subconsultant to Griffin Structures. This project, bound by Agua Chinon and Great Park Boulevard, involves the mass grading of 210 acres, including over-excavation and stockpiling for the Heart of the Park development area.

On-Call Project Management and Construction Management Services CITY OF IRVINE | IRVINE, CA
Project Manager. Ms. Bean oversees NV5’s contract with the City providing as-needed project management and construction management services, including augmentation of City staff. As part of this contract, she has served as Project and Construction Manager for a $1.5M for the William Woollett Jr. Aquatics Center that involved restoring and resurfacing three pools. Ms. Bean was also the Project Manager for the $280K exterior rehabilitation and painting for the Heritage Park Community Center and two other buildings in the park.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 10 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Rural Ridge Circle and Wilshire Avenue Water Main Replacement CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | ANAHEIM, CA Resident Engineer. Ms. Woodruff served as the Resident Engineer for this water main replacement project. The work consisted of two water main improvement areas: the Rural Ridge area for 4,230 LF and the Wilshire-Pearl area for 2,750 LF of 8-inch to 15-inch potable water main (PVC pipe and Ductile-Iron pipe), tie-ins to the existing potable water system, 142 one- and two-inch water services and meters, existing main abandonment, and final street restoration. NV5 provided full Construction Management, Resident Engineering, and Inspection Services for this project, including coordination with the City, shop drawing and RFI review, change order analysis, and scheduling management.

La Palma Avenue and Tustin Avenue Water Main Replacements CITY OF ANAHEIM | ANAHEIM, CA
Assistant Construction Manager. Our team is providing Construction Management and Inspection Services for the project. The work to be undertaken consists of a bore and jack operation at La Palma Avenue Railroad Crossing for 151 LF of 12-inch ductile-iron carrier pipe within a 24-inch steel casing and 145 LF of 36-inch ductile-iron carrier pipe within 48-inch steel casing. The work will also consist of a bore and jack operation at Tustin Avenue Railroad Crossing for 141 LF of 12-inch ductile iron carrier pipe within a 24-inch steel casing. Due to OCTA’s plan to expand its railways along La Palma Avenue and Tustin Avenue, the project is required to protect the pipes and increase service reliability at the existing water main located at the crossings.

Potable Water Valve Replacement FY 2021
CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | ANAHEIM, CA Construction Manager/Resident Engineer. Ms. Woodruff served as the Construction Manager/Resident Engineer and the City’s Representative for this design-build water valve replacement project. The work involved the standard water main valve replacements, including shutdowns, dewatering, excavation, disinfection and pressure testing, followed by final street restoration under the direction of Anaheim Public Utilities with NV5’s Resident Engineering and Inspection Services. Ms. Woodruff was responsible for managing the Design-Build Contractor and City’s Liaison via elements such as shop drawing review, answering RFIs, Contractor’s pay apps, scheduling review, and other elements such as creating the City’s shutdown plan for each of the 36 sites and coordinating with residents and Anaheim Public Utilities on shutdown.

She was responsible for coordinating and working with the design engineer and contractor on including additional valves requested by the City after award.

INDIA WOODRUFF
Assistant Project Manager/Construction Manager
Ms. Woodruff is a proactive, self-motivated Assistant Construction Manager/Resident Engineer who has managed at-risk projects throughout Southern California. She is experienced in Microsoft Office, Procore, Primavera P6, Microsoft Projects, AutoCAD, and Bluebeam Revu. Her solid negotiation and communication skills along with proven project management skills allow her to effectively interact with clients as well as construction trades.

CONTACT INFO
[email protected]

EXPERIENCE
7 years

EDUCATION
M.S. Civil Engineering
(Coastal Engineering),
University of Delaware
B.S. Civil Engineering,
Rowan University

LICENSES/CERTIFICATES
Metrolink Railroad Safety
Contractor Safety Trained,
No. 26471E22
AWARDS
“Honors” AGC
Construction Project
Management Course,
San Diego, CA (January
2021)
Ralph Alan Dusseau
Award for Civil &
Environmental
Engineering, Glasboro,
N.J. (May 2016)

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 11 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Bastanchury Road Widening
CITY OF YORBA LINDA | YORBA LINDA, CA
Construction Inspector. Mr. Smith provided construction inspection services for the Bastanchury Road Widening project between Casa Loma Avenue and Eureka Avenue. The scope of work included adding a second lane in each direction along with a two-way turn lane in the median; elevating portions of the roadway center line up to 6 feet; constructing retaining walls/structures; installation of traffic signals at the intersections of Bastanchury Road/Casa Loma Avenue and Bastanchury Road/ Eureka Avenue; and installation of new bike lanes, a multipurpose trail, and sidewalk/ parkway improvements with new irrigation and landscaping. NV5 also provided on-site welding inspection of a water line. Project considerations included coordination with an adjacent tract home development that was undergoing construction improvements; coordination with the Yorba Linda Water District; and coordination with utilities for relocations that would be made before the road widening.

Sidewalk & Curb Ramp Reconstruction (Phase 2)
CITY OF EL MONTE | EL MONTE, CA
Construction Inspector. Mr. Smith provided inspection services for this federally- assisted Sidewalk & Curb Ramp Reconstruction Phase 1 & 2. The scope of work included parkway improvements along various local/residential roadways within the City and includes the reconstruction of existing PCC sidewalks, curb and gutter, driveways, and ADA curb ramps; tree root pruning; and potential tree removal/ replacement.

Rural Ridge Circle and Wilshire Avenue Water Main Replacement CITY OF ANAHEIM | ANAHEIM, CA
Construction Inspector. Mr. Smith provided construction inspection services for this water main replacement project. The scope of work consists of two water main improvement areas: the Rural Ridge area and Wilshire-Pearl area. The Rural Ridge improvement area includes installation of a 12-inch PVC pipe (1,560 LF) , an 8-inch PVC pipe (1,820 LF), an 8-inch PVC pipe (480 LF), and a 6-inch PVC pipe (370 LF).

The Wilshire-Pearl improvement area includes installation of 12-inch Ductile-Iron pipe (1915 LF) and 8-inch Ductile-Iron pipe (825 LF).

MIKE SMITH
Inspector
Mr. Smith has more than 30 years of experience in public works, with expertise in water, wastewater, and street projects. Mr. Smith’s responsibilities include site observation and construction quality assurance and control, ensuring general site safety, preparing daily reports, photo documentation, monitoring SWPPP and BMP implementation, providing daily updates to the City and tracking quantities. He is also well versed with State health services requirements on water system disinfection, flushing, bacteria testing and water main tie-in procedures.

CONTACT INFO
[email protected]

EXPERIENCE
30 years

EDUCATION
A.A. Public Works,
Santiago Canyon College
A.A. General Education,
Saddleback College

CERTIFICATES
Water Distribution
Operator, Grade D4, State
Water Resources Control
Board (CDHS)
Water Treatment Operator,
Grade T1, State Water
Resources Control Board
(CDHS)
Collection System
Maintenance, Grade 2,
California Water
Environment Association
(CWEA)
Public Works Construction
Inspection Certificate
(Santiago Canyon College)
Public Works Certificate
(Santa Ana College)

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 12 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
William Woollett Jr. Aquatics Center
CITY OF IRVINE | IRVINE, CA
Construction Inspector. Mr. Sanchez provided construction inspection services for this pool replastering project (three pools) at the William Woollett Jr. Aquatics Center. The complex is a world-class aquatic facility open year round for regional and national competitive events with two 50-meter pools and a 25-yard instruction pool. NV5 provided a constructability review of the pending plans and specifications, and provided construction management and inspection during the restoration and resurfacing of all three pools.

Rural Ridge Circle and Wilshire Avenue Water Main Replacement CITY OF ANAHEIM | ANAHEIM, CA
Construction Inspector. Mr. Sanchez provided construction inspection services for this water main replacement and street improvements project. The work consisted of two water main improvement areas: the Rural Ridge area for 4,230 LF and the Wilshire-Pearl area for 2,750 LF of 8-inch to 15-inch potable water main, tie-ins to the existing potable water system, 142 1- and 2-inch water services and meters, existing main abandonment, and final street restoration. NV5 provided full Construction Management, Resident Engineering, and Inspection Services for this project, including coordination with the City, shop drawing and RFI review, change order analysis, and scheduling management.

University Drive Widening (Campus Drive to MacArthur Boulevard) CITY OF IRVINE | IRVINE, CA
Construction Inspector. Mr. Sanchez provided construction inspection services for the $16M University Drive Widening project, which included parkway improvements, street improvements, storm drain improvements, water improvements, and landscape and irrigation for the adjacent bike trail. The project consisted of traffic control, unclassified excavation, unclassified fill, construction of PCC curb ramps, median curb, curb and gutter, sidewalk, crack sealing, uniform depth cold milling, asphalt base course, asphalt concrete surface course, adjusting utility manholes and valves to grade, installation of traffic signs, striping, pavement markings, and raised pavement markers, installation of new traffic signals, traffic signal modifications, SCE coordination and installation of new streetlight infrastructure, storm drain installation, landscaping, irrigation system, and water quality BMPs.

SALVADOR SANCHEZ
Inspector
Mr. Sanchez is adept at managing and delivering a variety of public works construction projects. His skills in the development of project control procedures and methodologies for cost and schedule control have been implemented on several large-scale projects. Mr. Sanchez has accrued more than 30 years of public works experience, demonstrating his expertise in a range of responsibilities, including six years with the City of Riverside, nine years with the City of Pico Rivera and 14 years with the City of Glendale Water Department.

CONTACT INFO
salvador.sanchez
@nv5.com

EXPERIENCE
30 years

EDUCATION
Public Works Construction
Inspection Course, Cal
State Los Angeles

LICENSES/CERTIFICATES
Water Utilities Sciences
Certificate
Metrolink Railroad Safety
Contractor Safety Trained,
No. 26481E22
Former CA Water
Distribution Operator, D5
No. 08546
Former CA Water
Treatment Operator, T4
No. 16793

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 13 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Underground Utility Assessment District No. 113
CITY OF NEWPORT BEACH | CORONA DEL MAR, CA
Construction Administrator/Inspector. Mr. Puglisi provided Construction Administration, Inspection Services and Residential Permit Support Services for Undergrounding Utility Assessment District 113. The District was successfully formed in compliance with Proposition 218 requirements in November 2018 with 215 parcels. This project was selected as a recipient of an ASCE Outstanding Community Improvement Project Award in 2023.

Underground Utility Assessment District No. 117
CITY OF NEWPORT BEACH | CORONA DEL MAR, CA
Construction Administrator/Inspector. Mr. Puglisi provided Construction Administration, Inspection Services and Residential Permit Support Services for Undergrounding Utility Assessment District 117. The District was successfully formed in November 2015 with 268 parcels and comprises an 11-block area in Corona del Mar bounded by Bayside Drive, Avocado Avenue, Coast Highway, and Carnation Avenue and is mostly residential with some commercial properties. Construction began in July 2018 with a duration of 220 working days.

Public Works Construction
CITY OF NEWPORT BEACH | NEWPORT BEACH, CA
Public Works Construction Supervisor. Mr. Puglisi’s duties included assistance in all aspects of construction management, supervision of inspection services, and contract administration duties for the City’s Capital Improvement Program and Community Development Services. The (CIP) budget varied, but the 2016/2017 budget was nearly $67M. The yearly programs included Facilities (Marina Park and Oasis Senior Center); Parks (Sunset Ridge Park); Transportation Upgrade Program; Harbor and Beaches; Utility Upgrades and Maintenance, including all Assessment Districts; Streets and Drainage; Water Quality and Environmental; Water; and Wastewater. The Community Development Program included Public Utilities and citywide private development.

MARK PUGLISI
Inspector
Mr. Puglisi has more than 40 years of Public Works construction field experience and has worked at both the City of South Pasadena and City of Newport Beach, spending 33 years at the latter. He has held the positions of Civil Engineer, Construction Senior Inspector, and Construction Inspection Supervisor/Construction Contract Manager.

CONTACT INFO
[email protected]

EXPERIENCE
40 years

EDUCATION
Upper Division coursework
in Civil Engineering and
Geology, Cal State Long
Beach
A.S. Physical Science,
Glendale Community
College

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 14 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Code Enforcement & Building Inspection Services
CITY OF SAN DIEGO DEVELOPMENTAL SERVICES DEPARTMENT | SAN DIEGO, CA Combination Inspector I. Mr. Morales enforced regulations and performed skilled generalist inspection work for structural, electrical, mechanical, and related areas for new and existing structures. His duties included: inspecting residential structures including multifamily housing units and mobile homes; checking and enforcing field conformance to approved plans and compliance with zoning laws; and investigating complaints of building code violations.

Code Compliance Officer

CITY OF SAN DIEGO ENVIRONMENTAL SERVICES DEPARTMENT (WASTE REDUCTION DEPARTMENT) | SAN DIEGO, CA
Code Compliance Officer. Mr. Morales conducted field investigations of various businesses and properties for compliance with applicable codes and regulations. He would investigate complaints of excessive noise; illegal discharges to the storm drain system; off-street abandoned vehicles; off-street illegal parking; excessive towing charges; water waste or theft; unsightly litter; illegal dumping; waste code violations; illegal storage; graffiti; and planned and organized community cleanup events.

Fire Prevention Specialist
COUNTY OF SAN DIEGO FIRE AUTHORITY | SAN DIEGO, CA
Fire Prevention Specialist I. Mr. Morales performed fire-prevention and code enforcement duties, including:
• Coordinated fire plan check services of single-family dwellings and accessory structures with each local regional fire protection agency having jurisdiction (fire district)
• Reviewed and interpreted the conditions of all subdivisions and discretionary permits outside of fire districts
• Examined construction plans and specifications of residential, commercial, industrial, and public occupancy buildings, and recommended any changes necessary for compliance with fire standards related to sprinkler systems, fire hydrants, standpipe, fire alarm systems, and other suitable fire protection features • Interpreted and enforced the County Fire Code
• Served as a technical expert on all matters related to fire codes and trained inspection staff in the techniques of fire protection inspection, changes in methods, materials and requirements
• Promoted uniform and compatible tire code regulations, plan check and plan approval practices between fire districts

RONALD MORALES
Inspector
Mr. Morales has more than 30 years of experience providing building and safety services. His experience includes code enforcement, building inspection, and fire inspection for a wide range of structures, including residential, commercial, industrial, and public occupancy buildings. Mr. Morales is fluent in both English and Spanish and has excellent computer skills.

CONTACT INFO
[email protected]

EXPERIENCE
30+ years

EDUCATION
Fire Science coursework,
University of West Haven
Liberal Arts coursework,
Sacred Heart University

LICENSES/CERTIFICATES
CA Fire Inspector 1A, 1B,
1C, 1D
CA Fire Inspector 2A, 2B,
2C, 2D
CA Hazardous Materials
First Responder Awareness
Level
CA AH-221 Damage
Inspection Specialist -
DINS0005
PC 832 Laws of Arrest
San Diego Regional Public
Safety Training Institute
5-year Certificate,
Dr. Carl Holmes
Executive Development
Institute Organizational
Management Program
National Board of Fire
Service Professional
Qualifications Certification
#288710 - FF-1

REGISTRATIONS
Master Electrician, IBEW

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 15 C2. Resumes of Key Personnel
C. PROJECT TEAM
KENNETH P. HICKS, QSP
Inspector
Mr. Hicks has 18 years of experience providing construction inspection services for various capital improvement projects, including street improvements, wet and dry utilities, grading, stormwater, and landscaping and irrigation. He has provided quality assurance testing for highways, bridges and streets, sewer and water systems, and other structures using nuclear gauge or assigned equipment. He is experienced in working with local, state and federal facilities regarding land use, including right-of-way, construction, easements and other purposes.

Project Experience
Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvements CITY OF COMPTON | COMPTON, CA
Construction Inspector. Mr. Hicks is providing construction inspection services for the City’s Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvements project from Rosecrans Avenue to the southern City boundaries. The work includes pavement rehabilitation, including full-depth AC reconstruction and AC resurfacing; PCC improvements, including ADA-compliant curb ramps, bus pads, and median, sidewalk and driveway improvements; traffic signal modifications; installation of bus shelters and other site furnishings; pedestrian lighting improvements; landscaping and irrigation; and signing & striping.

San Fernando Road Beautification, Phase I
CITY OF GLENDALE | GLENDALE, CA
Construction Inspector. Mr. Hicks provided construction inspection services for the City’s San Fernando Road Beautification, Phase I project. The project was located on San Fernando Road between Grandview Avenue and Elk Avenue. The project included reconstruction and resurfacing of existing AC paving; reconstruction of existing sidewalks, driveways, curb and gutter, cross gutters, alley aprons, bus pads, and ADA ramps; construction of center median islands; adjustment of existing manholes and water meters to finished grade; removal and replacement of existing traffic striping and pavement markings; installation of Class II and III bike lane striping with green-backed shared roadway bicycle pavement markings; realignment of 12 intersections; traffic signal improvements; bus stop improvements; installation of drywells and bioswales; and installation of new landscaping and irrigation. This project received a 2024 APWA Best Project Award in the Traffic, Mobility & Beautification Category.

Sidewalk & Curb Ramp Reconstruction Phase 3 (CIP No. 052) CITY OF EL MONTE | EL MONTE, CA
Construction Inspector. Mr. Hicks provided construction inspection services for the federally assisted Sidewalk & Curb Ramp Reconstruction Phase 3. The scope of work includes parkway improvements along various local/residential roadways within the City and includes the reconstruction of existing PCC sidewalks, curb and gutter, driveways, and ADA curb ramps; tree root pruning; and potential tree removal/ replacement.

CONTACT INFO
[email protected]

EXPERIENCE
18 years

EDUCATION
High school graduate

LICENSES/CERTIFICATES
Qualified SWPPP
Practitioner (CA)
No. 27259 (CASQA)
Certified Inspector of
Sediment and Erosion
Control
Nuclear Gauge Certified
Railroad Safety
OSHA 30-Hour
OSHA 10-Hour

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 16 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Traffic Signal Improvements at Philadelphia Street and Towne Avenue/ Garey Avenue
CITY OF POMONA | POMONA, CA
Construction Inspector. Mr. Helma provided construction inspection services for this federally funded Traffic Signal Improvements project at Towne Avenue and Philadelphia Street, and at Garey Avenue and Philadelphia Street. The scope of work included installation of traffic signal poles and traffic signal controllers; traffic signage and striping; reconstruction of existing ADA curb ramps and sidewalks, AC paving, and all related site work to complete the proposed improvements. NV5 also provided construction management, geotechnical/materials testing and deputy inspection services for this project.

Hacienda Road Safety Improvement Project
CITY OF LA HABRA HEIGHTS | LA HABRA HEIGHTS, CA
Construction Inspector. Mr. Helma is providing construction inspection services for the City’s Hacienda Road Safety Improvement Project. Our team is providing construction management and inspection; labor compliance and wage monitoring; and materials testing and deputy inspection services for the City’s Hacienda Road Safety Improvement Project. The project includes the installation of new traffic signals and ancillary equipment at Hacienda Road and Avocado Crest Road; and the installation of traffic signage and striping. The project is located on Hacienda Road between the south and north city limits. The project includes funding from a state Highway Safety Improvement Program grant.

Bastanchury Road Widening
CITY OF YORBA LINDA | YORBA LINDA, CA
Construction Inspector. Mr. Helma provided construction inspection services for the Bastanchury Road Widening project between Casa Loma Avenue and Eureka Avenue. The scope of work included adding a second lane in each direction along with a two-way turn lane in the median; elevating portions of the roadway center line up to 6 feet; constructing retaining walls/structures; installation of traffic signals at the intersections of Bastanchury Road/Casa Loma Avenue and Bastanchury Road/ Eureka Avenue; and installation of new bike lanes, a multipurpose trail, and sidewalk/ parkway improvements with new irrigation and landscaping. NV5 also provided on-site welding inspection of a water line. Project considerations included coordination with an adjacent tract home development that was undergoing construction improvements; coordination with the Yorba Linda Water District; and coordination with utilities for relocations that would be made before the road widening.

MIKE HELMA, LEED AP
Inspector
Mr. Helma has more than 30 years of experience in construction management and inspection with specific expertise in street improvements, sewer, water and storm drain systems, heavy grading, concrete structures, traffic signals, paving and landscaping.

He is a LEED Accredited Professional and is adept at managing and inspecting large- and small-scale projects. He has also served as augmented staff for various public works departments.

CONTACT INFO
[email protected]

EXPERIENCE
30 years

EDUCATION
B.S. Civil Engineering, Cal
Poly Pomona

LICENSES
LEED Accredited
Professional

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 17 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Enterprise Street Rehabilitation from Aliso Creek Road to Aliso Viejo Parkway
CITY OF ALISO VIEJO | ALISO VIEJO, CA
Construction Inspector. Mr. Chiquete provided construction inspection services for the Enterprise Street Rehabilitation project. The work included reconstruction of existing PCC sidewalks and curb ramps, reconstruction and resurfacing of existing AC pavement, and traffic signage and striping.

FY 2021-22 Street Improvements
CITY OF LA HABRA HEIGHTS | LA HABRA HEIGHTS, CA
Construction Inspector. Mr. Chiquete provided construction inspection services for the City’s FY 2021-22 Street Improvements project. The scope of work includes street reconstruction and resurfacing, installation of AC berms, removal and construction of curb and gutter, utility adjustments, and traffic signage and striping. NV5 also provided geotechnical/materials testing and deputy inspection services for this project.

Sidewalk & Curb Ramp Reconstruction (Phase 2)
CITY OF EL MONTE| EL MONTE, CA
Construction Inspector. Mr. Chiquete provided inspection services for this federally- assisted Sidewalk & Curb Ramp Reconstruction Phase 1 & 2. The scope of work includes parkway improvements along various local/residential roadways within the City and includes the reconstruction of existing PCC sidewalks, curb and gutter, driveways, and ADA curb ramps; tree root pruning; and potential tree removal/ replacement.

Rural Ridge Circle and Wilshire Avenue Water Main Replacement CITY OF ANAHEIM | ANAHEIM, CA
Construction Inspector. Mr. Chiquete provided construction inspection services for this water main replacement project. The scope of work consists of two water main improvement areas: the Rural Ridge area and Wilshire-Pearl area. The Rural Ridge improvement area includes installation of a 12-inch PVC pipe (1,560 LF) , an 8-inch PVC pipe (1,820 LF), an 8-inch PVC pipe (480 LF), and a 6-inch PVC pipe (370 LF).

The Wilshire-Pearl improvement area includes installation of 12-inch Ductile-Iron pipe (1915 LF) and 8-inch Ductile-Iron pipe (825 LF).

JOE CHIQUETE
Inspector
Mr. Chiquete has more than 40 years of experience working for the City of Laguna Beach on Public Works projects, including utility underground projects. He is adept at working with residents, business owners and project stakeholders, and is excellent as a public contact and interface with project team members. Mr. Chiquete’s ability to problem-solve, research techniques and write reports makes him an asset to any team. He has skillfully prepared and presented visual and oral reports before various community associations, including city councils, planning commissions, design review boards, civic associations and community groups. He has expertise in several disciplines, including Urban Planning, Architecture, Environmental Planning, Construction Techniques, Transportation and Public Policy.

CONTACT INFO
[email protected]

EXPERIENCE
40 years

EDUCATION
B.A. Urban and Regional
Planning, Environmental
Analysis, UC Irvine

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 18 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Potable Water Valve Replacement FY 2021
CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT | ANAHEIM, CA Construction Inspector. Mr. Bean served as the Construction Inspector for this design- build water valve replacement project. The work involved standard water main valve replacements, including shutdowns, dewatering, excavation, disinfection, and pressure testing, followed by final street restoration under the direction of Anaheim Public Utilities with NV5’s Resident Engineering and Inspection Services.

J. W. Johnson Reservoir Facility Valve Replacements & Site Improvements LONG BEACH WATER DEPARTMENT | LONG BEACH, CA
Construction Inspector. Mr. Bean was the construction inspector for this project involving replacement of four underground water main valves, installation of five storm drain inlets, construction of a containment cell for an indoor above-ground chlorine tank, construction of a large concrete reinforced storage pad, trenching for the installation of electrical conduit, and re-paving of surface areas to allow for proper drainage. 15th Street & Cherry Avenue Sewer Replacement
LONG BEACH WATER DEPARTMENT | LONG BEACH, CA
Construction Inspector. Mr. Bean was the Construction Inspector for the replacement of 565 lineal feet of 8-inch cement sewer to 12-inch VCP sewer, and the reconnection of the sewer laterals. This project involved full sewer by-pass which was buried temporarily within the street that Mr. Bean constantly monitored for spill prevention. This was a high profile project that Mr. Bean was also responsible for on-going public relations as the project progressed. He was also in charge of paving inspection for the re-paving of Cherry Avenue.

Facilities Operation Plus
LOS ANGELES UNIFIED SCHOOL DISTRICT | LOS ANGELES, CA
Chief Electrical Estimator/Inspector. Mr. Bean was the chief electrical estimator and inspector for installations at the Los Angeles Unified School District. Mr. Bean did all material takeoffs and pricing for ongoing and upcoming projects. As an inspector, Mr.

Bean ensured that all installations were done properly and up to the standards and requirements from the Uniform Electrical Code. Installations included lighting and upgrading of lighting receptacles to install new energy efficient luminaries.

ROBERT BEAN
Inspector
Mr. Bean has more than 30 years of experience as an electrical inspector performing site quality control to ensure the Contractor constructs the work in accordance with the approved plans and specifications.

CONTACT INFO
[email protected]

EXPERIENCE
30 years

EDUCATION
A.A. Business
Administration, Rio Hondo
Junior College
Apprenticeship Program,
IBEW Local 11 Los Angeles

REGISTRATIONS
Former C10 Electrical
Contractor
Journeyman Electrician
Union Steward

AFFILIATIONS
IBEW Board of Trustees
NECA Board of Trustees

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 19 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Crowther Sanitary Sewer Pipeline Replacement
CITY OF PLACENTIA | PLACENTIA AND FULLERTON, CA
Senior Construction Inspector. Mr. Aghajanian served as Senior Construction Inspector on the Crowther Sanitary Sewer Pipeline Replacement project, which included replacement of approximately 7,400 LF of gravity sewer pipeline in Crowther Avenue, Placentia Avenue, and Orangethorpe Boulevard, located within the Cities of Placentia and Fullerton. The work involved installation of 15-inch, 18-inch, and 22-inch PVC and fused HDPE sewer pipeline and manholes. The work also included reconnection into all of the existing gravity mains and service laterals with a terminus tie-in connection at the existing Orange County Sanitation District’s trunk line on State College Boulevard. The project, which included an encasement crossing underneath the 57 freeway in Caltrans right-of-way, involved coordination with multiple agencies, including Caltrans, the Orange County Sanitation District, Golden State Water, Department of Health Services, the City of Fullerton, and other utility and governmental agencies. Working in high-traffic areas, as well as a jack-and-bore crossing underneath the Orange County Flood Control District’s flood control channel and a jack-and-bore crossing underneath the BNSF railroad, and multiple crossings of Southern California Gas Co.’s high-pressure gas feeder, were among the project’s challenges. NV5 provided construction management, inspection and materials testing services for this project.

On-Call Inspection Services
CITY OF BELLFLOWER | BELLFLOWER, CA
Construction Inspector. Mr. Aghajanian provides as-needed construction inspection services as part of NV5’s On-Call Inspection Services contract with the City for various capital improvement projects and encroachment permits throughout the City.

Drilling & Equipping of New Water Wells North Long Beach 13 & North Long Beach 14
LONG BEACH UTILITIES DEPARTMENT | LONG BEACH, CA
Construction Inspector. As a subconsultant to Wood Rodgers, NV5 is providing Construction Management and Inspection Services for the drilling and equipping of two separate potable water supply wells, Wells North Long Beach 13 & 14, with a design capacity of 2,500 gallons per minute. Located within a City park, the project requires coordination with residents and management of unhoused individuals.

Final well design includes two separate wells housed within a CMU building, with a submersible turbine pump and motor, electrical and SCADA equipment, above- and below-grade piping, valving and appurtenances, electrical, instrumentation and control, connection to existing water distribution system, testing and disinfection, and site restoration.

HAYKAZ AGHAJANIAN, PE
Inspector
Mr. Aghajanian has more than 20 years of utility and civil engineering experience. His experience includes preparing plans, specifications and cost estimates; performing plan reviews; and providing construction inspection services for a variety of utility and public works projects.

CONTACT INFO
haykaz.aghajanian
@nv5.com

EXPERIENCE
20 years

EDUCATION
B.S. Civil Engineering, Cal
State Los Angeles

LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 53866

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 20 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Lone Jack Road Emergency Repair
CITY OF ENCINITAS | ENCINITAS, CA
Construction Inspector. The $250K time-and-materials emergency repair project consisted of repairs to a weather-related sinkhole that caused the failure of a 100- foot section of roadway and the entire road to be closed to all traffic. The repair work excavated the full length to 4.3 feet below finished grade and installed 24 inches of 3/4-inch rock with Mirafi 570 geotextile fabric top and bottom, 18 inches of Class II base, and 8 inches of hot mix asphalt concrete. Additionally, a 300-foot subterranean drain was installed and up to 1/4 mile of roadway surface was overlaid. A companion headwall will be constructed to a damaged adjacent stream culvert.

Inland Rail Trail
SANDAG/CITY OF SAN MARCOS | SAN MARCOS, CA
City Construction Manager. The $2.7M project consisted of building a Class I bicycle facility between the South Santa Fe Avenue/North Pacific Street intersection and Cherimoya Drive. It is an 8-foot-wide, multiuse, paved pathway that connects to future bike paths or existing sidewalks. Work included retaining walls, paving, landscaping and irrigation, lighting, chain-link fence, drainage improvements with water retention/ percolation swales and ditches, signage and striping, and graded shoulders adjacent the NCTD Sprinter railroad line.

Armorlite Drive SMART-Growth Corridor Enhancements
CITY OF SAN MARCOS | SAN MARCOS, CA
City Construction Manager. This $3.5M grant-funded project reconfigured Armorlite Drive from North Las Posas Road to Bingham Drive to accommodate a complete street concept in a new, mixed-use district near Palomar College. Improvements included street parking, bicycle facilities, pedestrian pathways, lighting and landscaping, traffic calming, installation of curbs, gutters, traffic/pedestrian signal systems, storm drain systems and SWPPP. These improvements accommodated a complete street concept consistent with SanDAG’s SMART-Growth Incentive Program, encouraging use of alternative transportation public transit integration and enhanced pedestrian and bike access to reduce greenhouse gas emissions.

DUANE NEYENS
Inspector
Mr. Neyens has more than 30 years of experience in the construction industry, including experience as a construction inspector, engineering inspections supervisor, and city construction manager having responsibility for both public works and private development projects. Mr. Neyens has worked as a consultant inspector on public works projects for the County of San Diego and in residential development as a project superintendent for Western National Contractors. He has a solid reputation for his focus on detail, his organizational skills, and an orientation toward successful project outcomes.

CONTACT INFO
[email protected]

EXPERIENCE
30 years

EDUCATION
B.S. Organizational
Management, Ashford
University
A.S. Public Works
Management, Palomar
College

LICENSES/CERTIFICATES
Program Certificate
— Public Works
Management, Palomar
College with MSA and
APWA
Program Certificate —
Construction Inspection
Technology, San Diego
State University
Certified Inspector of
Sediment & Erosion
Control (CISEC)
QSP Trained
Concrete Testing
Technician (ACI)
Reinforced Concrete
Special Inspector (ICC)
Structural Masonry
Special Inspector (ICC)

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 21 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Permeable Alley Project Specification No. 3954
CITY OF GLENDALE | GLENDALE, CA
Construction Inspector. Mr. Warren is providing construction inspection services for the City’s Permeable Alley Project Specification No. 3954. This project includes the reconstruction of existing AC paving; construction of permeable concrete gutters; and installation of 14 drywells and 11 bioswales in and around 28 alleys at various locations throughout the City.

Bastanchury Road Widening
CITY OF YORBA LINDA | YORBA LINDA, CA
Construction Inspector. Mr. Warren provided construction inspection services for the Bastanchury Road Widening project between Casa Loma Avenue and Eureka Avenue. The scope of work included adding a second lane in each direction along with a two-way turn lane in the median; elevating portions of the roadway center line up to 6 feet; constructing retaining walls/structures; installation of traffic signals at the intersections of Bastanchury Road/Casa Loma Avenue and Bastanchury Road/Eureka Avenue; and installation of new bike lanes, a multipurpose trail, and sidewalk/parkway improvements with new irrigation and landscaping. NV5 also provided construction management, inspection, materials testing/deputy inspection, and labor compliance services for the project, as well as on-site welding inspection of a water line. Project considerations included coordination with an adjacent tract home development that was undergoing construction improvements; coordination with the Yorba Linda Water District; and coordination with utilities for relocations that would be made before the road widening.

Rural Ridge Circle and Wilshire Avenue Water Main Replacement and Street Improvements
CITY OF ANAHEIM | ANAHEIM, CA
Construction Inspector. Mr. Warren provided construction inspection services for this water main replacement and street improvements project. The work consisted of two water main improvement areas: the Rural Ridge area for 4,230 LF and the Wilshire-Pearl area for 2,750 LF of 8-inch to 15-inch potable water main, tie-ins to the existing potable water system, 142 1- and 2-inch water services and meters, existing main abandonment, and final street restoration. NV5 provided full Construction Management, Resident Engineering, and Inspection Services for this project, including coordination with the City, shop drawing and RFI review, change order analysis, and scheduling management.

DANIEL WARREN
Inspector
Mr. Warren is a construction inspector with more than 30 years of experience in public works, including the positions Construction Inspector for the City of La Habra Heights and Grade III Water Distribution Operator and Grade II Water Treatment Operator for the Rowland Water District. Mr. Warren is extremely knowledgeable about the need for the Contractor’s conformance to the approved plans and specifications, adherence to field quality control, as well as what the various heavy construction industry standards and construction principles are for water and wastewater systems.

CONTACT INFO
[email protected]

EXPERIENCE
30 years

EDUCATION
High school graduate

LICENSES
Water Distribution
Operator Grade III
No. 8020
Water Treatment Operator
Grade II No. 18940
Recycled Site Supervisor
Conversion from Potable
to Recycled Water
Competent Person Site
Survey for Soil Conditions
Trench Shoring Certified
Underground Utilities
Certified
OSHA 30-Hour Outreach
Training Program
certification

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 22 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Traffic Signal Improvements at Bellflower Boulevard and Park Street and Bellflower Boulevard and Cedar Street
CITY OF BELLFLOWER | BELLFLOWER, CA
Construction Inspector. Mr. Irvin is providing construction inspection services for the Traffic Signal Improvements at Bellflower Boulevard and Cedar Street and at Bellflower Boulevard and Park Street. NV5 is providing construction management, inspection, labor compliance and geotechnical/materials testing services for the project. The scope of work includes installation of traffic signal poles and traffic signal controllers; traffic signage and striping; reconstruction of existing ADA curb ramps and sidewalks, AC paving, and all related site work to complete the proposed improvements.

On-Call Inspection Services
CITY OF BELLFLOWER | BELLFLOWER, CA
Construction Inspector. Mr. Irvin provides as-needed construction inspection services as part of NV5’s On-Call Inspection Services contract with the City for various capital improvement projects and encroachment permits throughout the City.

Ontario Ranch Business Center
REAL ESTATE DEVELOPMENT ASSOCIATES | ONTARIO, CA
Senior Construction Manager. The $100M project included the complete infrastructure development for a 158-acre commercial business center with 13 buildings totaling over 3,000,000 SF, including storm drain, sewer and water improvements, dry utilities, street improvements, street lighting and traffic signals.

La Palma Avenue Metrolink Pedestrian Improvements
CITY OF ANAHEIM | ANAHEIM, CA
Foreman/Project Manager. The $2.5M project included major street improvements, new landscape medians, major curb, gutter and driveway removal and replacement, and full-width grind and AC paving using ARHM of La Palma Avenue.

MICHAEL P. IRVIN
Inspector
Mr. Irvin is an experienced general engineering construction manager, superintendent, and inspector, specializing in public works, street and site development. He has 40 years of experience in the construction industry and is skilled in mass excavation, fine grading, paving, sewer, water, storm drain, dry utility and street construction. Mr. Irvin is a reliable professional with excellent communication and leadership skills.

CONTACT INFO
[email protected]

EXPERIENCE
40 years

EDUCATION
High school graduate

LICENSES/CERTIFICATES
Certified Erosion,
Sediment and Storm Water
Inspector (CESSWI)
Confined Space
Certification
First Aid Certification
Trench Safety
AGC Leadership in
Construction Course

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 23 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Elk Creek Sustainable Drinking Water Project/Transmission Pipeline and Storage Tank Reconfiguration
ELK CREEK COMMUNITY SERVICES DISTRICT | ELK CREEK, CA
This project consisted of construction of 5,200 LF of 6-inch HDPE (via horizontal directional drilling) potable water transmission pipeline and appurtenances; construction of ductile iron transmission pipeline affixed to the exterior of an existing concrete bridge; installation of assorted isolation valves, blow-off valves, and air release valves; AC pavement removal and replacement along county roads; reconfiguration of an existing storage tank, including new inlets and outlets, vault removals, piping reconfiguration; and connection to existing water pipelines.

California High Speed Rail, CP 2-3

ARCADIS NORTH AMERICA
Senior Quality Engineer/Design-Build Construction Oversight. Mr. Caniglia developed and managed QA/QC plans, internal and external audits, construction oversight and inspections, and review of construction phase submittals and FDCs.

California High Speed Rail, Construction Package-1
TUTOR PERINI CORP.

Quality Control Engineer.

City of Fresno Southeast Surface Water Treatment

RMA GEOSCIENCE
Project Inspector.

AOC Madera Courthouse

MOORE TWINING AND ASSOCIATES/ENGINEERS AND LABORATORIES Project Inspector.

DAVID J. CANIGLIA, LEED GA
Inspector
Mr. Caniglia is a construction QA/QC professional with a lengthy background in heavy civil and infrastructure projects. His responsibilities have included developing and managing quality control plans, performing internal and external audits, contracting compliance, reviewing submittals and RFIs, and performing construction inspections assuring work-in-place complies with all codes, standards, and project specifications.

Mr. Caniglia is experienced in identifying and facilitating the resolution of noncomplying work, coordinating third-party testing and inspection agencies, managing the inspection request process, sourcing inspections, and performing root-cause analysis.

CONTACT INFO
[email protected]

EXPERIENCE
44 years

EDUCATION
High school graduate

LICENSES/CERTIFICATES
Leadership in Energy and
Environmental Design
(LEED) Accredited
OSHA 30-Hour

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 24 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Pearl Avenue Sewer Replacement
CITY OF COMPTON | COMPTON, CA
Construction Inspector. Ms. Mohammed is providing field engineering services for the placement of flow metering devices within the existing sewer system on the City’s Pearl Avenue Sewer Replacement project. This existing sewerline includes an additional reach of 400 LF of Pearl Avenue Sewer additions between Rosecrans Avenue and East Kay Street. The City’s sanitary sewer system has experienced prolonged structural damage and capacity deficiencies for years, and this project replaces aging pipes that have impacted the carrying capacity of the aging sewer infrastructure system. Flow metering devices are assisting NV5 with the capacity to develop a preliminary hydraulic model of the sewer main in this limited area, in order to determine if certain reaches can be lined in place, or must be replaced in place due to the need to upsize the existing pipelines. November 2024-Current
Permeable Alley Project Specification No. 3954
CITY OF GLENDALE | GLENDALE, CA
Construction Inspector. Ms. Mohammed provided construction inspection services for the City’s Permeable Alley Project (Specification No. 3954). This project includes the reconstruction of existing AC paving; construction of permeable concrete gutters; and installation of 14 drywells and 11 bioswales in and around 28 alleys at various locations throughout the City. May 2024
Diversion Sewer Pipes to Abandon Fox Hills Pump Station CITY OF CULVER CITY | CULVER CITY, CA
Construction Inspector. Ms. Mohammed is providing construction inspection services for the Diversion Sewer Pipes to Abandon Fox Hills Pump Station project. The project will construct 1,230 LF of 18-inch diversion sewer mains from Fox Hills pump station to Bankfield pump station. The project includes constructing 18-inch FRPM (Fiberglass- reinforced pipe) in a 36-inch RCP casing by microtunneling (1,223 LF) at an average depth of 28 feet to 30 feet; constructing new manholes; pavement restoration of all existing improvements; 18-inch force main tie-in near City of Los Angeles manhole and associated temporary bypass system; 1,600 LF of abandonment of portions of the existing dual force 12-inch and 18-inch mains; 1,230 LF of CCTV inspection; and demolition of Fox Hills pump station and the Overland pump station.

JINAN MOHAMMED
Inspector
Ms. Mohammed is an adaptable construction professional with 13 years of experience and a proven knowledge of executive support, construction management and inspection, staff training and development, and workflow prioritization. She has experience with a wide range of public works projects and previously managed a material testing laboratory.

CONTACT INFO
jinan.mohammed@
nv5.com

EXPERIENCE
13 years

EDUCATION
B.S. Chemical Engineering
(Specialized in Petroleum
and Gas Refinery),
University of Technology
(Iraq)

LICENSES/CERTIFICATES
ACI Concrete Field Testing
Technician Grade1
CPN training course on
radiation safety and use of
nuclear gauge
Liquid Boot system
methane mitigation
installation inspector
CEE Colombia Engineering
Executive Engineering
Construction Project
Management Certification
CSWO Construction
Storm Water Operator
Certification No. 24568
In the process of gaining
the CCM Certified
Construction Manager
Certification

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 25 C2. Resumes of Key Personnel
C. PROJECT TEAM
Project Experience
Various Public Works Projects
CITY AND COUNTY OF SAN FRANCISCO | SAN FRANCISCO, CA
Construction Inspector. Ms. Miles conducted on-site inspections of public works projects, including roads, sidewalks, sewer systems, and water infrastructure. The inspections ensured compliance with plans specifications, city codes and safety regulations. Ms. Miles reviewed contractor work for adherence to project scope and resolved field issues as needed, and also prepared detailed inspection reports, progress updates and compliance documentation. Her work involved coordination with engineers, contractors, and city departments to ensure smooth project execution.

Sewer System Rehabilitation
CITY OF OAKLAND | OAKLAND, CA
Resident Engineer. Ms. Miles oversaw construction and rehabilitation of the City’s sanitary sewer system, ensuring compliance with city and state regulations. She reviewed engineering plans specifications and contract documents to verify proper execution. The work involved coordinating with contractors, engineers, and public stakeholders to ensure project alignment with design requirements, as well as conducting on-site inspections of trenching, pipe installation, and sewer rehabilitation.

Ms. Miles maintained detailed reports of construction progress, issues, and resolutions.

Various Coast Guard Projects

UNITED STATES COAST GUARD
Construction Inspector. Ms. Miles worked with the U.S. Coast Guard to implement the organization’s construction inspection plans. She inspected contractor work efforts and evaluated progress while solving problems that arose. Ms. Miles performed complex and routine standard inspections of construction to evaluate whether appropriate materials and construction processes were used; and that the construction conformed to plans, specifications and special provisions. She created daily reports to document all construction activities, safety and quality of work to ultimately protect the Coast Guard’s infrastructure. The work involved labor compliance reports to verify that Federal ordinances are followed. Ms. Miles inspected construction projects and supervised contractors to ensure compliance with the requirements of the project.

TIFFANY MILES
Inspector
Ms. Miles has 20 years of experience as a construction inspector with a strong background in public utilities, water infrastructure, and civil construction inspections.

She has a proven ability to ensure compliance with specifications, codes and safety regulations while overseeing complex municipal projects. Ms. Miles has extensive experience working with water/wastewater systems, meter installation, lift stations and utility rehabilitation. She’s well-versed in reviewing plans, conducting field inspections, coordinating with contractors and stakeholders, and documenting project progress. Ms. Miles is dedicated to maintaining high standards of quality, safety, and environmental compliance in public infrastructure projects.

CONTACT INFO
[email protected]

EXPERIENCE
20 years

EDUCATION
High school graduate

LICENSES/CERTIFICATES
American Society of
Home Inspectors (ASHI)
Certification
Confined Space
Certification
OSHA 30-Hour Certification

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 26 C2. Resumes of Key Personnel
Project Experience
On-Call Plan Check + Public Works Inspection Services
CITY OF BEAUMONT | BEAUMONT, CA
Project Engineer. Ms. Peterson is responsible for reviewing all water quality technical reports in compliance with local municipal requirements and provided construction inspection and stormwater training for City staff. NV5 reviews all plans and associated technical reports for clarity, format, completeness, and conformance to the City’s grading and roadway criteria, industry-standard design procedures, permit requirements, and conditions of development. Reviews include improvement, grading, and erosion control plans, sewer and storm drain plans, hydrology and hydraulic reports, water quality reports, geotechnical reports, structural calculations and cost estimates. Ms. Peterson also provides staff extension support to the City to manage construction site inspections in accordance with their MS4 permit requirements.

Lake Drive Storm Drain Replacement
CITY OF ENCINITAS | ENCINITAS, CA
Project Engineer. Ms. Peterson is providing engineering design services for the Lake Drive Storm Drain Replacement Project, which involves the replacement of approximately 2,000 feet of failed 48-inch corrugated metal pipe (CMP) with new reinforced concrete pipe (RCP) through an environmentally sensitive canyon area between Lake Drive and Interstate 5 (I-5). During the design period, due to significant and unusual regional rainfall events, a large sinkhole developed at the top of the project limits, eventually affecting a portion of Lake Drive and local utilities, prompting an emergency response by the City. NV5 worked closely with the City and the emergency construction crews to produce an emergency “interim” design to collect and convey the drainage.

QSD/QSP Services
CITY OF IMPERIAL BEACH | IMPERIAL BEACH, CA
Ms. Peterson provided review of the developer’s SWPPP for the Breakwater project site and provided input to City staff on recommended Best Management Practices for the site. She performed QSP inspections in the early stages of projects to assure the project BMPs were installed correctly.

JENNIFER PETERSON, PE, CFM, QSD/P, CPESC, LEED AP
Inspector
Ms. Peterson is a senior project manager with 28 years of focused experience working in the water resources field and managing stormwater projects — from the planning stages all the way through design and construction. She has managed stormwater inspection staff throughout California and provides assistance to other offices and project managers in preparing technical documents and addressing challenging issues related to the State’s General Construction Permit, and Phase I and II Municipal (MS4) Permits. She has managed stormwater programs for various agencies throughout the state, which has included preparation and review of technical water quality documents, creating tools and processes for efficient plan check reviews, stormwater training, review and editing of technical specifications, and management of various stakeholders and subconsultant staff. She is an experienced project manager with a proven track record of delivering projects on time and within budget.

C. PROJECT TEAM

CONTACT INFO
jennifer.peterson
@nv5.com

EXPERIENCE
28 years

EDUCATION
B.S. Civil Engineering
(Environmental), University
of Iowa

LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 67821
Qualified SWPPP
Developer/Qualified
SWPPP Practitioner
(CA) No. 00502 (CASQA)
Certified Floodplain
Manager
Certified Professional
in Erosion & Sediment
Control
LEED Accredited
Professional
AWARDS + HONORS
2024 Outstanding
Service Award for
contributions to CASQA’s
Construction General
Permit Training Team

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 27 C. PROJECT TEAM
C2. Resumes of Key Personnel
Project Experience
Construction Inspector
CITY OF CORONA | CORONA, CA
Construction Inspector. Mr. Keizer inspected public works and public utilities construction and maintenance projects to ensure compliance with safety regulations and construction codes. He inspected potable and non-potable water systems and sanitary sewer systems, including installation, testing, maintenance, and repair.

Mr. Keizer also inspected stormwater drainage systems and year-round protections, ensuring compliance with NPDES standards. He inspected concrete street improvements, including sidewalks, drive approaches, wheelchair ramps, block walls, and other elements, as well as asphalt concrete street paving and slurry seal coating, ensuring correct street sections by checking grades and elevations. Additionally, he observed earthwork grading, slope construction, earthen berms, and surface drainage, and reviewed soils compaction reports and grading certificates. Mr. Keizer inspected all aspects of traffic control set-ups and maintenance for conformance with codes, specifications, and safety practices, and inspected underground dry utility systems.

He responded to citizen complaints and requests for information from the general public, developers, contractors, and utility representatives. Mr. Keizer performed final inspections of construction projects for field acceptance, prepared lists of required corrections prior to field acceptance or final bond exoneration, and issued certificates of occupancy.

Construction Inspector
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS | GREATER LOS ANGELES AREA, CA Construction Inspector. Mr. Keizer was responsible for inspecting permitted activities in public and flood control district rights-of-way to ensure compliance with permits and approved plans. He inspected permitted activities to ensure proper restoration of existing improvements, interpreted engineered construction plans, reported variances, and documented inspections. Mr. Keizer responded to inquiries and complaints from the public, performed continuous inspections on projects, identified and resolved minor issues impacting assigned projects, and ensured approved materials were received and correctly implemented. He coordinated testing of materials when necessary, performed calculations from plans to verify locations, grades, and depths of utilities, and identified non-compliant work, taking appropriate action to bring it back into compliance. Mr. Keizer ensured all changes and modifications were noted on final plans, made photographic documentation of project progression, and maintained thorough, accurate, and informative reports.

JOHN KEIZER
Inspector
Mr. Keizer is a seasoned construction professional based in Cypress, CA, with extensive experience in quality control and inspection roles for public works construction. He has served several public agencies, including the County of Los Angeles, City of Corona, and SoCalGas. He is skilled in project management, quality assurance, and construction inspection. His expertise is complemented by strong leadership and communication skills, making him a valuable asset to any construction project.

CONTACT INFO
[email protected]

EXPERIENCE
14 years

EDUCATION
A.S. Public Works, Citrus
College

LICENSES/CERTIFICATES
CPR Certification

TIME/EFFORT LEVEL FOR

THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 28 C. PROJECT TEAM
C2. Resumes of Key Personnel

Bob Martinez

Project Level
Construction Inspector

Qualifications
• Over 10 Years of Construction Inspection Experience
• Proficient in Permits, Pump Stations, Manhole Lining, Main Repairs & Emergency Repair Work
• Specialized in Water and Sewer Infrastructure, including Construction and Inspection of Water Distribution Systems, Pressure Regulating Stations, Sewer Trunk Lines, and Lift Stations
• Diverse Public Sector Project Portfolio at Irvine Ranch Water District, South Coast Water District, and the City of Santa Monica

Project Experience

Peacock Hills Service Area Pressure Regulating Station, City of Oceanside, CA: Construction Inspector (2001 – 2010)
Percentage of time on project site: 100% | Construction contract value: $1 million

• Inspected pressure regulating station construction for compliance with project specifications and industry standards.
• Verified that all system components, including valves and pipelines, met quality and operational requirements.
• Monitored contractor performance, identified deviations from plans, and ensured corrective measures were taken.

12 MG Medical Center (Scott Labs) Reservoir Construction Project, City of San Bernardino, CA:

Construction Inspector (2001 – 2010)
Percentage of time on project site: 100% | Construction contract value: $3 million

• Conducted quality control inspections on reservoir construction, monitoring concrete placement, grading, and pipeline connections.
• Verified compliance with state and federal water infrastructure regulations. • Assisted in resolving construction challenges to ensure project completion within schedule and budget

TIME/EFFORT LEVEL

FOR THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 29 C. PROJECT TEAM
Project Partners
Bob Martinez
Construction Inspector

Page 2 ends

College Pipeline, City of San Bernardino Municipal Water Department, CA: Construction Inspector (2001 – 2010)
Percentage of time on project site: 100% | Construction contract value: $5 million

• Reviewed engineering plans and monitored construction activities to ensure adherence to approved designs.
• Conducted testing on pipeline materials and infrastructure components to verify durability and functionality.
• Coordinated with engineers and contractors to troubleshoot issues and implement solutions.

City of Santa Monica, CA: Construction Inspector (2001 – 2010) Percentage of time on project site: 100% | Construction contract value: $15 million

• Worked on various projects including 15B Sewer Pipe Bursting, Linings, and Replacements, Olympic Boulevard Trunk Sewer (Project 11), Lincoln Boulevard 39- inch Trunk Sewer Replacement (Project 12), Project 9 Sewer Replacements, Project 13 Sewer Linings, Project 8 Sewer Linings, and Project 14 Sewer Linings.

Los Angeles County Department of Public Works, Los Angeles, CA: Construction Inspector (2001 – 2010)
Percentage of time on project site: 100% | Construction contract value: $2 million

• Worked on various projects including Green Flag Drain in the City of Redondo Beach, Private Drain 553 in Harbor City, Project 9037 Unit 2 in the City of Long Beach, and Sewer Lining in the City of Marina Del Rey.

South Coast Water District, CA: Construction Inspector (2001 – 2010) Percentage of time on project site: 100% | Construction contract value: $3 million

• Worked on various projects including the Groundwater Recovery Project and Headlands Development Project.

Moulton Niguel Water District, CA: Construction Inspector (2001 – 2010) Percentage of time on project site: 100% | Construction contract value: $10 million

• Worked on various projects including the Lower Salada Sewer Lift Station and Wet Well and Relocation of 30-inch Eastern Transmission Line.

Education
BS Cal State Long Beach, Long Beach, CA
Engineering
C2. Resumes of Key Personnel
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 30 C. PROJECT TEAM

Ramnik Mungra, P.E.

Project Level
Lead Construction Inspector
Qualifications
• Construction Inspector With Over 30 Years Of Experience • 33 Years With The City Of Los Angeles
• Extensive Experience InDesign, Treatment Plants, And Project Management • Proficient InPump Stations, ConsultantOversight, AndConstructionManagement • Team Player
Relevant Experience
City of Los Angeles (1988-2021)
Project Engineer, HEDD/WTED/EED (1990-2000)
• Designed $23M PBA Modifications project at the Hyperion Treatment Plant. • Responsibilities for overall project delivery included organizing, directing, and coordinating with structural, mechanical, electrical, instrumentation; Designed streets, pumps, piping and monitored project expenditures.
• Construction management of $2.0M Dockweiler Beach Improvements project included writing, reviewing and approval of submittals, shop drawings, RFI’s, payment requests and schedule updates.
• Prepared a concept report for Headworks Improvements project for Terminal Island Treatment Plant.
• Planned, designed, and managed construction of a $2.0M Dockweiler Beach, managed design of $1.84M Abrasive Blast-Steam Cleaning, $1.25M Hazardous Waste Storage Facility projects.
• Designed rehabilitation of pumps, control systems and ventilation systems for Wastewater pumping stations.

Senior Civil Engineer, Street (2018-2021)
• Managed on the average of $125M Street Program.
• Duties included establishing and implementing policies, procedures, and protocols; Issued TOS and consultant selections’ interview/approval process; Coordinated with consultants, other agencies including Council Districts and Mayor’s Office; Coordinated, monitored, reviewed for QA/QC and approved projects for delivering multiple projects simultaneously; Analyzed CIP projects’ budgets for various delivery methods; C2. Resumes of Key Personnel

TIME/EFFORT LEVEL

FOR THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 31 C. PROJECT TEAM
C2. Resumes of Key Personnel

Project Partners
Ramnik Mungra, P.E.

Lead Construction Inspector

Page 2 ends

Supervised and mentored the city staff and consultants; Chaired a weekly design and construction team meetings; Reported the program updates to management and to oversight committee.

Civil Engineer / Project Manager I, Street and Stormwater (2005-2018) • Managed on the average $75M grant funded street projects simultaneously. • Typical duties included coordinating with various City and outside agencies including Council Districts, Mayor’s Office, Metro, and Caltrans; Petitioned for various grants and secured Funding Agreements for CIP projects; Wrote and issued TOS’; Procured consultant contracts, and processed progress payments; Budgeted, scheduled, and delivered projects successfully; Monitored design, environmental issues and construction contracts for schedule and cost overruns; Reported projects’ updates to City Engineer and STPOC committee; Presented projects to communities; Wrote, briefed and presented Board Reports; Supervised, delivered multiple street projects simultaneously on time, within budget and to the clients’ satisfaction.

Civil Engineer, Metro Transportation Group (2002-2005)
• Metro Transportation Group (MTG) responsible for coordination and review of improvements to City facilities due to Metro-Light Rail and Bus RT projects. • Duties included preparing, negotiating and securing group’s Annual Work Program and monitoring group’s expenditures; Reviewed contract documents, coordinated and delegated engineering tasks; Wrote and presented Board Reports for Special Permitting Process and finalized Master Cooperating Agreement with Metro; Approved Design Exceptions and revised TCTMC Ordinance; Established design criteria and policies with Metro/contractors; Attended executive sessions and partnering meetings; Chaired TCTMC; Wrote Special Order for Design/Build projects; Optimized review process, office record management and supervised the group.

Project Engineer, LAWA (2000-2002)
• As a CM assistant, managed construction of $35.2M Taxiway C project. • Managed construction of $1.5M Traffic Operation Center and closed-out of $14.2M Parking Structure 6 projects.
• Typical duties of CM included conducting weekly construction meeting; Coordinated with design/CM consultants, contractors, airlines, tenants, LADOT, PW and other governing agencies.
• Also, reviewed, and approved submittals, RFI’s, FM’s, CO’s, progress payments, and schedule updates; Wrote RFP and Board Reports; Coordinated bid and award activities; Issued tenant Construction Approval Permits.

Civil Engineering Assistant I & II, District Offices (1988-1990) • Street projects' design included traverses, curve data, quantity take offs, cross sections, profiles, plans, vertical and horizontal curves, and pavement reports. • Performed B-permit plan checks, wrote discretionary action reports and assisted public at the counter.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 32 C. PROJECT TEAM
C2. Resumes of Key Personnel

Project Partners
Ramnik Mungra, P.E.

Lead Construction Inspector

Page 3 ends

Education
BS Washington State University
Civil Engineering, 1988
Professional Certification
Registered Civil Engineer, California
Professional Skills
• Program Management
• Project Management
• Construction Management
• Staff Management
• Working knowledge of: Word, Excel, e-2020, Gmail, PowerPoint, & Microsoft Office City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 33 C. PROJECT TEAM
C2. Resumes of Key Personnel

Bill Fernandez

Project Level
Lead Construction Inspector

Qualifications
• Over 32 Years of Public Works Inspection Experience
• Special Inspector for Water Pipelines and Tie-ins
• Experienced in Caltrans Requirements for Public Works Pipelines Installations • Familiar with Soils Inspection, Post Grading and Trenching • Has Provided Inspections for Various Southern California Municipalities • Possesses PS&E Compliance, Daily Observation and Reporting Experience • Veteran in Public Relations including Major Shutdowns for the Port of Long Beach, as well as Public Works Construction within Private Property

Project Experience

Installation of Fire Hydrant and Water Service Laterals, County of Los Angeles, Los Angeles, CA:

Special Inspector (2012 – 2014)
Percentage of time on project site: 100% | Construction contract value: $5 million

Construction observer and special inspector for installation of 350’ of 8” DIP, 3- 6” Fire Hydrant laterals and installation of 110- 1” water service laterals off 8” DIP to meter box.

Pressure testing line and disinfecting line, prior to operational. Performed under County of Los Angeles permit. Also inspected all traffic control and daily clean up at end of the day

Alley Water Main Conversion – Phase II, Long Beach Water Department, Long Beach, CA: Special Inspector (2014 – 2016)
Percentage of time on project site: 100% | Construction contract value: $7 million

Construction Observer and Special Inspector for the conversion of 170 private water mains and four tie-ins within the Caltrans jurisdiction of Pacific Coast Highway on pipelines for final tie-ins. Additional work on Pacific Coast Highway and Caltrans proficiency to ensure project was properly constructed meeting the requirements of the plans and specifications.

TIME/EFFORT LEVEL

FOR THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 34 C. PROJECT TEAM
C2. Resumes of Key Personnel
Project Partners
Bill Fernandez
Lead Construction Inspector

Page 2 ends

Water Main Bridge Crossing Project, Long Beach Water Department, Long Beach, CA: Special Inspector (2016 – 2018)
Percentage of time on project site: 100% | Construction contract value: $5 million

Ensured that the Contractor met the requirements of the contract documents including special permit requirements with LACFCD and coordinated shutdowns with the Port of Long Beach.

Residential Area 7 / Arterial Zone 5 Road Maintenance Project, City of Diamond Bar, Diamond Bar, CA: Special Inspector (2010 – 2012)
Percentage of time on project site: 100% | Construction contract value: $7 million

The scope of work included rehabilitation of 19.5 miles of residential, collector and arterial streets. In areas of extreme degradation, asphalt overlay or full-width grind and replacement with manhole removal and replacement to grade. Other work included deep lift repair, striping, traffic control, crack seal repairs and public notification.

Irvine Cove Crest / Pelican Hill Roadway, City of Irvine, Irvine, CA: Senior Inspector (2003 – 2010) Percentage of time on project site: 100% | Construction contract value: $10 million

Oversaw coordination for permits to ensure best management practices. This 2-million cubic yard project included curb and gutter, reconstruction of the bas, grading, and realignment of multiple streets, including Barranca Parkway, Jamboree Road, and MacArthur Boulevard. One of the major challenges was the documentation and coordination with Metropolitan Water District since there were a lot of encasements of their pipes to be done during constructions.

Alicia Parkway Street Widening, City of Laguna Hills, Laguna Hills, CA: Public Works Inspector (2006 – 2008)
Percentage of time on project site: 100% | Construction contract value: $5 million

Scope included street widening, curb and gutter, utility coordination, traffic control, trench filing, grind and overall, removal and replacement of asphalt patches. Communicated with the City, Contractor, and business owners to work on traffic access to minimize business impact. Ensured the contractor’s implementation of SWPP during construction met the requirements of the plans and specifications

Additional Projects
Performed Inspection of Installation of 1000’ Sewer Line. Inspection of 1000’ of trenchless pipe bursting and lining of PVC Piping into older sewer line.

Inspection of Caltrans Street improvements: Concrete flat work; ADA compliance; sub grade; base placement and Asphalt.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 35 C. PROJECT TEAM
Project Partners
Bill Fernandez
Lead Construction Inspector

Page 3 ends

As Senior Public Works Inspector , worked on two major water line projects : installation of a 20" DIP for the City of Duarte and 350' feet of 8" DIP and water service to meter box for the City of Los Angeles.

Public Works Inspector; Slurry Seal Projects; City of Yorba Linda; Yorba Linda, CA.

Over a 3 -year period, Mr. Fernandez was a Public Works Inspector for numerous projects for the City of Yorba Linda, including slurry seal projects. His responsibilities included maintaining daily construction reports of men and equipment on the site and hours worked, measuring, calculating and recording all quantities of items removed from or incorporated into the work, taking photos documenting the work, and performing daily observation for compliance with plans and specifications for each project. Duties included observation of traffic control and securing the safety of the public as well as workers on site. Mr. Fernandez also worked on several major roads, residential and commercial projects.

Senior Soils Technician and Special Inspector; Multiple Public and Private Projects; City of Costa Mesa, City of Irvine, City of Huntington Beach, City of Newport Beach, City of Brea, City of Torrance, Orange County Environmental Management Agency/Public Works, Assessment District, and Caltrans; Los Angeles County and Orange County, CA.

Mr. Fernandez worked as a senior soils technician and special inspector on several major road projects, residential, commercial, and school projects. All projects were completed under the jurisdiction of various government agencies, including the City of Costa Mesa, City of Irvine, City of Huntington Beach, City of Newport Beach, City of Brea, City of Torrance, Orange County Environmental Management Agency/Public Works, Assessment District and Caltrans. Some projects included post-grading, trench backfilling, sewer, water, storm drains and utility trenching. Mr. Fernandez supervised the structural section testing for bridges, dams’ deep foundations, and paved streets with Caltrans. He was also responsible for supervision and training of other technical and field personnel.

Registrations/Certifications
• ACI Concrete Certification
• Trench Shoring Safety Certification
• Caltrans HC-1 for Test Methods for 201, 202, 216, 217,231 • Deputy Grading Inspector, City of Los Angeles
• Deputy Inspector, Asphalt, City of Irvine
• Nuclear Soil Gauge Certification
• Trench Shoring Safety Certification
• 40-hour HAZMAT
• RSO – Radiation Safety Officer

C2. Resumes of Key Personnel
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 36 C. PROJECT TEAM
C2. Resumes of Key Personnel

Ken Higbee, P.E.

Project Level
Lead Construction Inspector

Qualifications
• Over 41 Years Of Experience
• Extensive Experience In Public Works Plan Checking, CIP, And Project Cost Estimates
• Proven Experience In Design, Project Management, and Construction Projects • Strong Written And Oral Communication Skills
• Team Player

Relevant Experience

City of Lomita (5 Months)
Construction Manager - Consultant

• Managed construction contract for $2.2 million street reconstruction contract. • Facilitated Value Engineering agreement between City and Contractor that resulted in $166,000 project savings. Savings were split 60 percent in favor of the city, and 40 percent in favor of the contractor.
• Reviewed and approved contract change orders.
• Reviewed and approved invoices.
• Managed efforts of Engineer of Record, Sub Consultants, and Contractor.

Los Angeles County Public Works (2 Months)
Construction Manager - Consultant

• Reviewed Change of Work requests.
• Provided recommendations to County Management for how to proceed with construction of Cogswell Dam Clean Out project to maintain schedule and remain in compliance with regulatory permit requirements.
• Provided daily and weekly inspection reports.

County of Orange-Public Works (29 Years)
Project Engineer

Planned Communities (6 Years)

TIME/EFFORT LEVEL

FOR THESE SERVICES
100%
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 37 C. PROJECT TEAM
C2. Resumes of Key Personnel
Project Partners
Ken Higbee, P.E.

Lead Construction Inspector

Page 2 ends

• Implemented Project Management Best Practices such as Earned Value Analysis to accomplish efficient and expeditious planning, design, plan checking, financing, construction, and inspection of public infrastructure projects for local flood control, road, water quality, and environmental projects.
• Reviewed and approved Plans and Specifications for road and flood control improvements.
• Coordinated the technical review of Plans and Specifications among consultants and other County agencies and departments.
• Provided job cost accounting and cost estimates for public infrastructure projects

Operations and Maintenance (4 Years)
• Conducted field engineering during construction. Reviewed construction contract change orders and participated in dispute resolution conferences Administered various construction contracts.
• Supervised the design/drafting of construction drawings, and prepared specifications and cost estimates for improvements to road, flood control, harbor, beaches, and parks facilities.
• Performed hydrology studies and hydraulic analyses for flood control facilities. • Prepared a Request for Proposal and monitored a consultant contract for an area-wide drainage study.
• Designed biotechnical and structural erosion control systems

Special Districts (6 Years)
• Administered and coordinated the acquisition of right-of-way, planning, engineering, financial, and scheduling efforts of right-of-way agents, design engineers, project management consultants, construction contractors, landowners, and other county agencies and divisions.
• Managed all project and financial aspects of a program implementing a regional network of roads, bridges, and drainage improvements within various Assessment and Community Facilities Districts.
• Reviewed and approved Land Developers’ requests for reimbursement of expenses incurred to design, administer, and construct the necessary improvements. • Prepared and administered financial reports for fund sharing programs with other government agencies that provided and allocated funds for various projects. Two such fund sharing programs: State/Local Transportation Program with CALTRANS; Measure “M” Program with the Orange County Transportation Authority. • Prepared and maintained comprehensive status reports for public / private program for use by policy and decision makers summarizing the ongoing accomplishments and issues as well as the financial, design, and construction status of the program.

Building Permits (4 Years)
• Provided engineering consultation and general assistance at the building department’s public counter.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 38 C. PROJECT TEAM
C2. Resumes of Key Personnel
Project Partners
Ken Higbee, P.E.

Lead Construction Inspector

Page 3 ends

• Reviewed architectural and structural plans and supporting documents of commercial and residential buildings for compliance with applicable laws, codes, ordinances, and regulations. Issued building permits.

Subdivision and Grading (7 Years)
• Reviewed grading plans and supporting documents for compliance with applicable laws, codes, ordinances, and regulations. Issued grading permits for earthwork construction. • Reviewed and approved hydrology reports and hydraulic calculations for drainage improvements within new tract developments.
• Reviewed grading plans and improvement plans for adherence to county hydrologic and hydraulic standards and safety requirements.
• Reviewed encroachment permits, site plans, parcel maps, tract maps, grading plans, and improvement plans for adherence to applicable laws, codes, ordinances, county standards, and safety requirements for traffic related items. • Prepared traffic related Conditions of Approval for new subdivision site plans, parcel maps, and tract maps.
• Reviewed and approved traffic studies in support of new commercial and tract development.
• Prepared plans, specifications, and estimates for improvements to major arterial highway intersections. Performed design calculations.
• Supervised professional and design/drafting staff.
• Performed cost and scheduling tasks for a regional program of intersection modification projects.
• Supervised the efforts of private consulting firms, other government agencies and County divisions in obtaining necessary right-of-way and permits

Infrastructure Programs (1 Year)
• Managed all aspects of 325 million dollar fee program known as the South County Roadway Improvement Program (SCRIP). Prepared Fee Credit Agreements. Provided financial data for budget purposes.
• Prepared Final Invoice and all support documents for 15.5 million dollar federal grant for a South County major arterial highway.

Golden State Water Company (8 Months)
Engineering Services Supervisor

• Manage the design of Eleven (12) different water main replacement projects utilizing four (4) different consultants.
• Review plans and provide overall QA / QC for each project. • Implement project management best practices to ensure each project is completed on budget and on time.

RTG Investment – Agua Dulce Development (1 Month)
Design Consultant

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 39 C. PROJECT TEAM
C2. Resumes of Key Personnel
Project Partners
Ken Higbee, P.E.

Lead Construction Inspector

Page 4 ends

• Prepared hydraulic analysis of Storm Drain System to determine feasibility of various alternatives relative to approved storm drain plans.
• Prepared cost reduction study that analyzed Agua Dulce Storm Drain Improvements - Phase 1 - Tract 50385-01. The study analyzed three (3) alternatives for reduction in cost compared to approved plans.

City of Long Beach (1 Year)
Resident Engineer – Project Manager – Consultant

• Reviewed Plans and Specifications for various Street Rehabilitation projects. Reviewed cost estimates for said projects. Conducted field reviews of various projects currently in design to insure completeness and accuracy.
• Prepared Cost Estimate for the purpose of securing funding for a State of California – Housing and Urban Development (HUD) Grant through the Affordable Housing and Sustainable Communities (AHSC) Program that reduces greenhouse gas emissions.

Worked with State, City, and a private developer to finalize the Grant application.

Assigned as the project lead within the Public Works department. • Prepared Monthly Budget analysis for the City’s 30 million dollar Major and Arterial Highway program. Analysis included the implementation of Earned Value Analysis to provide the best means available to complete the program on time and within budget.

City of Desert Hot Springs (3 Months)
Project Manager - Consultant

• Reviewed traffic portion of City’s proposed amendment to the General Plan to insure completeness and accuracy. Provided recommendations for street segments and intersections to be included in the traffic study. Also provided recommendations as to the most efficient use of both new and existing traffic count data to provide the most reliable prediction of future traffic.
• Reviewed Plans and prepared Specifications for three (3) Community Development Block Grant (CDBG) projects.
• Prepared Conditions of Approval (COA) for various commercial and mixed-use tract developments. Conducted site reviews to determine any need to revise COA for any project with an existing Conditional Use Permit.

City of San Gabriel (3 Months)
Project Manager - Consultant

• Prepared Staff Report for the award of construction contract for the pavement rehabilitation of Del Mar Avenue. Evaluated bids and prepared responses to city staff and city council regarding biding of the project.
• Reviewed Plans and Specification and oversaw the bid process for the pavement rehabilitation of Del Mar Avenue.
• Prepared Request for Proposal (RFP) for the upgrade of the city’s sewer system.

Responded to all Requests for Information (RFI’s) submitted by Firms interested in the RFP.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 40 C. PROJECT TEAM
C2. Resumes of Key Personnel
Project Partners
Ken Higbee, P.E.

Lead Construction Inspector

Page 5 ends

CF Braun & Co, Alhambra, CA (4 Years 6 Months)
Civil Design Engineer

• Performed civil design engineering of port and harbor, oil field pipeline, and petrochemical facilities for the international oil industry. • Performed alignment calculations, specification preparation, aerial photography interpretation/terrain analyses, soils studies, and hydrology studies. • Supervised the design/drafting of construction drawings for oil field central processing facilities, drill sites, overland pipelines, and roads. • Performed duties as an on-site field liaison between the California design office and the construction contractor during the construction of oil field pipeline facilities in the Prudoe Bay area of Alaska.
• Coordinated the on-site shipment and utilization of materials for the construction of two semi-submersible jack-up drilling rigs in the Port of Hong Kong, and in Kaohsiung, Taiwan.
• Prepared mass properties reports for two semi-submersible drilling rigs.

Education

California State University, Fullerton
Graduate Studies in Business Administration

BS Colorado State University
Civil Engineering, 1980

Professional Certification

Registered Civil Engineer, California Number C38233
Expiration 03-31-25

Project Management Professional (PMP), Project Management Institute Number 1221961, Expiration 11-30-23

Certified Building Plans Examiner, International Code Council Number 5228423-B3, Expiration 02-06-25

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 41 D. RELEVANT EXPERIENCE OF THE TEAM
Rural Ridge Circle and Wilshire Avenue
Water Main Replacement
ANAHEIM PUBLIC UTILITIES (APU) | ANAHEIM, CA
NV5 provided Construction Management/Resident
Engineering and Inspection Services for this water main replacement project. The work consisted of two water
main improvement areas: the Rural Ridge area for 4,230
LF and the Wilshire-Pearl area for 2,750 LF of 8-inch
to 15-inch potable water main, tie-ins to the existing
potable water system, 142 1- and 2-inch water services
and meters, existing main abandonment, and final street restoration. NV5 provided full Construction Management, Resident Engineering, and Inspection Services for this
project, including coordination with the City, shop drawing and RFI review, change order analysis, and scheduling
management.

CONTACT: LISA O’CONNELL, PE, SENIOR CIVIL ENGINEER, APU WATER SERVICES, 714.765.4225, [email protected]
CONTRACT: $204,451 + $89,000 EXTENSION
DATES: FEBRUARY 2022-JULY 2023
KEY PERSONNEL: LUANNE BEAN, INDIA WOODRUFF, SAL

SANCHEZ, DAN WARREN, JOE CHIQUETE, MIKE SMITH
D1. Understanding of Range of Projects & Objectives
NV5 is ready to provide inspection consulting services for a range of City projects that may include, but are not limited to:
street rehabilitations, sewer, water, and storm facility improvements, traffic signals, above- and below-ground electrical facility improvements, public park improvements, facility and system maintenance, general City capital improvement projects, and private developer-type projects. Our team of inspectors has the depth of experience to provide support for all of these types of projects and more. We know that the endurance of construction projects depends on the workmanship and quality of materials used in construction, and documented oversight of this process is NV5’s duty and responsibility.

Our team will perform tasks including review of plans and specifications; developing an efficient sequence of work to meet City milestones; and maintaining administrative requirements related to projects. We will coordinate with the contractor and the City for full transparency, documenting all activities so the lines of communication are always open.

D2. Technical Expertise to Provide Services
Working under the direction of the Construction Services Division, our inspectors are fully qualified to provide construction inspection services for any City projects that require support. NV5’s team includes Registered Engineers in a variety of disciplines, ICC-certified plans examiners, ICC-certified building officials, ICC-certified building inspectors, and ICC-certified combination inspectors, along with a variety of other certified and licensed professionals. By supporting all disciplines in-house, we have the ability to coordinate inspections, discuss unique aspects that may impact multiple disciplines, and work together to deliver high-quality construction inspection services unmatched by other teams.

D3. Relevant Projects & Similar Contracts
In the examples that follow, we outline a range of inspection-related projects and on-call contracts that NV5 has either recently completed or that are ongoing. Members of our proposed team in Section C are noted as Key Personnel, demonstrating that our inspectors are familiar working with one another in a variety of capacities.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 42 D. RELEVANT EXPERIENCE OF THE TEAM
William Woollett Jr. Aquatics Center
CITY OF IRVINE | IRVINE, CA
NV5 provided Project Management, Construction
Management and Inspection Services for this pool
re-plastering project (three pools) at the William
Woollett Jr. Aquatics Center. The complex is a world-
class aquatic facility open year round for regional
and national competitive events with two 50-meter
pools and a 25-yard instruction pool.NV5 provided
a constructability review of the pending plans
and specifications, and will provide construction
management and inspection during pool restoration.

CONTACT: MICHAEL COURTNEY, FACILITIES MAINTENANCE

SUPERINTENDENT OF REHABILITATION, PUBLIC WORKS
AND TRANSPORTATION DEPARTMENT, 949.724.8209,
[email protected]
CONTRACT: $89,640 DATES: AUGUST 2021-CURRENT
KEY PERSONNEL: LUANNE BEAN, DANIEL WARREN
FY 22-23 and Hacienda Road Street Improvements
CITY OF LA HABRA HEIGHTS | LA HABRA HEIGHTS, CA
NV5 is providing construction management and inspection; labor compliance and wage monitoring; and materials testing and deputy inspection services for the City’s FY 22-23 and Hacienda Road Street Improvements project. The project includes street improvements to various roads throughout the City. Specifically, the scope of work includes clearing and grubbing; reconstruction and resurfacing of existing asphalt pavement; construction AC Berms, PCC curb and gutter, storm drain catch basin; crack sealing of existing AC pavement; and in-stallation of traffic signage and striping.

CONTACT: RAFFERTY WOOLDRIDGE, CITY MANAGER, 562.694.6302, [email protected] CONTRACT: $192,364 DATES: JULY 2024-CURRENT
KEY PERSONNEL: MIKE HELMA, MIKE SMITH, JOE CHIQUETE
La Palma Ave. & Tustin Ave. Water Main Replacement at OCTA Railway Crossing ANAHEIM PUBLIC UTILITIES (APU) | ANAHEIM, CA
Our team is providing construction management and inspection services for the City’s La Palma Avenue and Tustin Avenue Water Main Replacement at OCTA Railway Crossing project. Metrolink with the Orange County Transportation Authority is expanding the Anaheim Canyon Metrolink Station, which includes the addition of a train track crossing at both La Palma Avenue and Tustin Avenue. The water main replacement project involves bore-and-jack installation of two new water mains underneath the OCTA railroad track in La Palma Avenue and Tustin Avenue, followed by the abandonment of the existing water mains that will now be too shallow and are not adequately reinforced to carry the load underneath the proposed train track. The project includes close coordination with the City, OCTA, Metrolink, Southern California Regional Rail Authority (SCRRA), among other agencies.

CONTACT: ROBERT HOANG, PRINCIPAL ENGINEER, APU WATER ENGINEERING DIVISION, 714.765.4229, [email protected] CONTRACT: $269,913 DATES: NOVEMBER 2021-CURRENT
KEY PERSONNEL: LUANNE BEAN, INDIA WOODRUFF, SALVADOR SANCHEZ, DAN WARREN, KENNETH HICKS City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 43 Bastanchury Road Widening
CITY OF YORBA LINDA | YORBA LINDA, CA
NV5 provided construction management,
inspection, materials testing/deputy
inspection, and labor compliance services
for the Bastanchury Road Widening project
between Casa Loma Avenue and Eureka
Avenue. The scope of work included adding
a second lane in each direction along
with a two-way turn lane in the median;
elevating portions of the roadway center line
up to 6 feet; constructing retaining walls/
structures; installation of traffic signals at
the intersections of Bastanchury Road/
Casa Loma Avenue and Bastanchury
Road/Eureka Avenue; and installation
of new bike lanes, a multipurpose trail
with biofiltration swales, and sidewalk/
parkway improvements with new irrigation and landscaping. NV5 also provided on-site welding inspection of a water line.

Project considerations included coordination with an adjacent tract home development that was undergoing construction improvements; coordination with the Yorba Linda Water District; and coordination with utilities for relocations that would be made before the road widening.

CONTACT: RICK YEE, DEPUTY DPW/ASSISTANT CITY ENGINEER, 714.961.7171, [email protected] CONTRACT: $518,457
DATES: JANUARY 2023-NOVEMBER 2024
KEY PERSONNEL: MIKE SMITH
D. RELEVANT EXPERIENCE OF THE TEAM
Diversion Pipeline
CITY OF CULVER CITY | CULVER CITY, CA
NV5 provided construction management, inspection, and
engineering services for the construction of sewer main diversion pipes reversing sewer flow via conventional
cut and cover as well as trenchless jack and bore
methods to abandon Mesmer and Overland Sewer
Pump Stations. This also involved extensive permits and coordination with Caltrans, the City of Los Angeles, and the City of Culver City for these jack and bore pipelines underneath the I-405 and Route 90. The goal of the
project was to divert flows from four of the City’s sewer pump stations to a new sewage pump station, Bankfield
Station, which is another project in which NV5 provided construction management and inspection services during
construction.

CONTACT: HONG WANG, PE, SENIOR CIVIL ENGINEER,
310.253.5604, [email protected]
CONTRACT: $420,000
DATES: MARCH 2019-2021
KEY PERSONNEL: LUANNE BEAN, DAN WARREN
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 44 D. RELEVANT EXPERIENCE OF THE TEAM
Traffic Signal Improvements
CITY OF BELLFLOWER | BELLFLOWER, CA
NV5 is providing construction management, inspection,
labor compliance and geotechnical/materials testing
services for the Traffic Signal Improvements at Bellflower Boulevard and Cedar Street and at Bellflower Boulevard
and Park Street. The scope of work includes installation of traffic signal poles and traffic signal controllers; traffic signage and striping; reconstruction of existing ADA curb ramps and sidewalks, AC paving, and all related site work to complete the proposed improvements.

CONTACT: LEN GORECKI, ASSISTANT CITY MANAGER/DIRECTOR
OF PUBLIC WORKS, 562.804.1424, EXT. 2259, LGORECKI@
BELLFLOWER.ORG
CONTRACT: $283,826
DATES: JULY 2024-CURRENT
KEY PERSONNEL: MIKE IRVIN
Traffic Signal Improvements
CITY OF POMONA | POMONA, CA
NV5 provided construction management, inspection,
geotechnical/materials testing and deputy
inspection ser-vices for this federally funded Traffic
Signal Improvements project at Towne Avenue
and Philadelphia Street, and at Garey Avenue and
Philadelphia Street. The scope of work included
installation of traffic signal poles and traffic signal controllers; traffic signage and striping; reconstruction of existing ADA curb ramps and sidewalks, AC paving,
and all related site work to complete the proposed
improvements.

CONTACT: RON CHAN, SENIOR CIVIL ENGINEER,
909.620.2286, [email protected]
CONTRACT: $115,805
DATES: JUNE-SEPTEMBER 2022
KEY PERSONNEL: MIKE HELMA
Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvements CITY OF COMPTON | COMPTON, CA
NV5 is providing construction management and inspection services, labor compliance and geotechnical/materials testing and deputy inspection services for the Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement project from Rosecrans Avenue to the southern City boundaries. The work includes pavement rehabilitation, including full-depth AC reconstruction and AC resurfacing; PCC improvements, including ADA-compliant curb ramps, bus pads, and median, sidewalk and driveway improvements; traffic signal modifications; installation of bus shelters and other site furnishings; pedestrian lighting improvements; landscaping and irrigation; and signing & striping.

CONTACT: JOHN STRICKLAND, PUBLIC WORKS DIRECTOR, 310.605.5505, [email protected] CONTRACT: $477,802 DATES: OCTOBER 2024-CURRENT
KEY PERSONNEL: KENNETH HICKS
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 45 D. RELEVANT EXPERIENCE OF THE TEAM
San Fernando Road Beautification, Phase I
CITY OF GLENDALE | GLENDALE, CA
NV5 provided construction inspection services for the City’s San Fernando Road Beautification project. The project was located on San Fernando Road between Grandview Avenue and Elk Avenue. The project included reconstruction and resurfacing of existing AC paving; reconstruction of existing sidewalks, driveways, curb and gutter, cross gutters, alley aprons, bus pads, and ADA ramps; construction of center median islands; adjustment of existing manholes and water meters to finished grade; removal and replacement of existing traffic striping and pavement markings; installation of Class II and III bike lane striping with green-backed shared roadway bicycle pavement markings; realignment of 12 intersections; traffic signal improvements; bus stop improvements; installation of drywells and bioswales; and installation of new landscaping and irrigation. This project received a 2024 APWA Best Project Award in the Traffic, Mobility & Beautification Category.

CONTACT: ARMEN AVAZIAN, PE, ENV SP, PRINCIPAL CIVIL ENGINEER, 818.937.8246, [email protected]
CONTRACT: $137,090 DATES: JANUARY-OCTOBER 2024
KEY PERSONNEL: KENNETH HICKS
Margarita Recreation Center
CITY OF TEMECULA | TEMECULA, CA
NV5 provided Owner’s Representative services for the
reconstruction of the Margarita Recreation Center. This Design- Build (DB) project demolished the existing facility and replaced it with a new 8,500-square-foot building and 25-yard outdoor pool.

The new facility includes a zero-depth, warm water, wheelchair accessible six-lane pool, dance/fitness studio, classroom, and multi-purpose room. As part of its services, NV5 provided preliminary engineering and geotechnical design, project management, construction management, resident inspection, geotechnical and materials testing and deputy inspection, and environmental and land surveying. In concert with City staff, NV5 prepared the design bridging documents and the DB Request for Proposal and assisted the City with the DB contract Advertising and Award process. NV5’s Bridging Documents and Design
Guidelines included schematic designs and technical specifications for Architectural, Civil, Geotechnical, Structural, Mechanical and Electrical improvements, as well as a detailed project estimate. It also included an overall CPM schedule covering acquisition of the DB contractor, final design, permitting, construction, post-construction and closeout. NV5 oversaw the design during the various stages to assure that the requirements of the contractual Bridging Documents were met. Finally, our team assisted the City in establishing/developing its policies, procedures, and other necessary documents for all phases of the DB process.

CONTACT: NINO ABAD, PE, ASSOCIATE CIVIL ENGINEER, 951.308.6385, [email protected] CONTRACT: $2.24 MILLION
DATES: FEBRUARY 2019-MARCH 2024
KEY PERSONNEL: MIKE HELMA
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 46 D. RELEVANT EXPERIENCE OF THE TEAM
Additional Experience: Similar On-Call Contracts
The following is a sampling of on-call or as-needed contracts NV5 currently holds involving construction inspection services similar to those requested by the City.

CLIENT ON-CALL SERVICES
City of Aliso Viejo On-Call Construction Inspection Services City of Beaumont On-Call Inspection, Plan/Map Check and Stormwater Management Services City of Bellflower On-Call Construction Management and Construction Inspection Services City of Culver City On-Call Professional Services (including- Construction Management and Inspection) City of El Monte On-Call Construction Management and Inspection Services City of Fontana On-Call Engineering Services (including Inspection) City of Glendale (Public Works) On-Call Engineering Services (Construction Management and Inspection) City of La Mesa As-Needed Specialized Professional Services (including Construction Management and Inspection)
City of Laguna Niguel On-Call Professional Services (On-Call Construction Management and Inspection Services (Amendment 1) )
City of Palm Springs On-Call Construction Management and Inspection Services City of Pico Rivera On-Call Construction Management and Inspection Services City of Placentia On-Call Construction Management and Inspection Services City of Pomona On-Call Consultant List 2020-2025 (Construction Management, Inspection and Sampling Services)
City of San Bernardino Civil Engineering Design, Consulting and Project Management Services (including Inspection and Management of Construction Projects)
City of Santa Ana On-Call Water Resources Construction Management and Inspection Services City of Santa Fe Springs On-Call Engineering Professional Services (including Construction Management and Inspection)
City of Yorba Linda On-Call Consultant Services (Category F: Construction Management and Inspection Services)
Irvine Ranch Water District On-Call Construction Inspection Services Las Virgenes Municipal Water
District On-Call Construction Management and Inspection Services City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 47 E. FEE SCHEDULE
Fee Schedule
Effective through December 31, 2025. After this time, NV5 will receive a 3% rate increase for each consecutive year beginning January 1, 2026.

MUNICIPAL SERVICES HOURLY RATE**
Project Manager $215
Assistant Project Manager $190
CONSTRUCTION SERVICES HOURLY RATE**
Senior Construction Manager $205
Construction Manager $190
Senior Office Engineer $155
Office Engineer $128
Construction Inspector * $164***
Construction Administration $98

REIMBURSABLE EXPENSES COST
Reproduction Cost
Consultant Services Cost + 15%
Automobile Transportation per IRS standard
Delivery, Freight, Courier Cost
Agency Fees Cost
Commercial Travel Cost
* Assumes prevailing wages are applicable for fieldwork. ** Regular rates. Work in excess of 8 hours and work on Saturdays will be billed at 1.5 times the regular rate. Work in excess of 12 hours and work on Sundays and Holidays will be billed at 2 times the regular rate. ***Projects subject to the City’s PLA/CWA will incur an additional hourly charge of $32.81 on top of the regular Inspector rate to cover Union costs.

Combined Indirect Cost Rate (Includes Fringe Benefit, Overhead, and General Administration) = 144.82% City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 48 E. FEE SCHEDULE
Fee Schedule for Subconsultant Project Partners
RFQ No.:

RFP Title: REQUEST FOR PROPOSALS TO PROVIDE CONSULTING INSPECTION SERVICES PRIME CONSULTANT NAME:

SUB-CONSULTANT NAME:

CLASSIFICATION TITLE

UNBURDENED

HOURLY RATE
($$$)

OVERHEAD
(%)
FRINGE

BENEFITS
(%)

SUBTOTAL
($$$)
PROFIT
(%)

TOTALLY BURDENED
RATE
($$$)
Lead Construction Inspector* 90.00$ 43% 36% 161.10$ 12% 180.43$ Construction Inspector* 80.00$ 43% 36% 143.20$ 12% 160.38$ Lead Construction Inspector* 92.00$ 43% 36% 164.68$ 12% 184.44$ Construction Inspector* 82.00$ 43% 36% 146.78$ 12% 164.39$ *Subject to increases from the California Department of Industrial Relations on August 1 annually RFP2025-Insp
NV5
Project Partners
Non-Standard Work Shift
Standard Work Shift
# Mott MacDonald Restricted
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 49 F. LITIGATION
Litigation Disclosure
The industry in which NV5 provides professional services can yield claims that arise from time to time. These claims predominantly consist of general allegations related to professional errors or omissions for work performed under a contract or project. Accordingly, NV5 maintains adequate insurance coverage to protect against any and call claims.

Furthermore, there are no claims or lawsuits, either threatened or pending, that would impair NV5’s ability to perform on this request for proposal.

References
Provided below are references of clients for whom inspection services have been performed in recent years that are comparable in quality and scope to that specified in this RFP.

CITY OF

YORBA LINDA
Rick Yee
Deputy DPW/Assistant
City Engineer
4845 Casa Loma Ave.

Yorba Linda, CA 92886
714.961.71719
[email protected]
Relevant Projects:

Bastanchury Road Widening
(construction management and
inspection); FY 20-21 and FY 2019-
20 Annual Pavement Preservation
Programs (CM&I); As-Needed Public
Works Inspection Services

CITY OF

CULVER CITY
Hong Wang
Senior Civil Engineer
9770 Culver Blvd.

Culver City, CA 90232
310.253.5604
[email protected]
Relevant Projects:

Diversion Pipeline (construction
management, inspection, and
engineering services); On-Call
Professional Services (including
construction management and
inspection)

CITY OF LA HABRA

HEIGHTS
Rafferty Wooldridge
City Manager
1245 N. Hacienda Road
La Habra Heights, CA 90631
562.694.6302
[email protected]
Relevant Project:

FY 22-23 and Hacienda Road
Street Improvements (construction
management and inspection; labor
compliance and wage monitoring;
and materials testing and deputy
inspection services)
G. REFERENCES
City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 50

ACKNOWLEDGMENT OF CONTRACT CONDITIONS
A. Reference Exhibit B
NV5 has reviewed and accepts the City’s Insurance and Indemnification Provisions in Exhibit B.

B. Conflict of Interest
NV5 does not have any conflicts or potential conflicts of interest that would result from performing this work for the City.

We will avoid any potential for future conflict upon selection and understand that we would be precluded from providing services to another client on any project for which we are hired by the City.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 51

ADDENDUM ACKNOWLEDGMENT
City of Anaheim

DEPARTMENT OF PUBLIC WORKS

Page 11 of 44 ends

Anaheim City Hall
200 S. Anaheim Blvd.

Anaheim, CA 92805
TEL (714) 765-5176

www.anaheim.net
AADDDDEENNDDUUMM NNOO.. 11

TO THE REQUEST FOR PROPOSALS (RFP)

To Provide

CCOONNSSUULLTTIINNGG IINNSSPPEECCTTIIOONN SSEERRVVIICCEESS

May 22, 2025
II.. GGEENNEERRAALL
The following changes, additions, or deletions shall be made as indicated, and all other conditions shall remain the same.

IIII.. DDEESSIIGGNN--BBUUIILLDDEERR QQUUEESSTTIIOONNSS AANNDD AANNSSWWEERRSS

Q1

Is security systems part of this scope? If not, how do we get involve with the city on helping with security systems?
AA11 SSeeccuurriittyy ssyysstteemmss iiss nnoott ppaarrtt ooff tthhee ssccooppee.. KKeeeepp aa llooookk oouutt ffoorr sseeccuurriittyy ssyysstteemm rreellaatteedd pprrooccuurreemmeennttss oonn OOppeennGGoovv..

Q2

Can the covers and tabs be excluded from the page count? AA22 YYeess,, ccoovveerr ppaaggeess aanndd ttaabbss ccaann bbee eexxcclluuddeedd ffrroomm tthhee ppaaggee ccoouunntt..

Q3

is it possible to request an extension due to Memorial Day holiday? AA33 AA ddaayy eexxtteennssiioonn iiss ggrraanntteedd.. RReeqquueesstt ffoorr PPrrooppoossaallss wwiillll bbee oonn dduuee oonn 55//3300//22002255 aatt 55::0000 ppmm..

Q4

Please confirm that Scope for contract is both Construction Management (CM) and Inspection - Title of RFP is "Consulting Inspection Services".

AA44 SSccooppee ooff wwoorrkk ffoorr ccoonnttrraacctt iiss oonnllyy ffoorr IInnssppeeccttiioonn SSeerrvviicceess..

Q5

Please confirm whether material testing and special inspections are part of the scope of work or if "coordination" will be limited to scheduling with the City's own material testing consultant.

AA55 MMaatteerriiaall tteessttiinngg iiss nnoott ppaarrtt ooff tthhee ssccooppee bbuutt mmaayy iinncclluuddee ccoooorrddiinnaattiinngg wwiitthh tthhee CCiittyy’’ss oowwnn mmaatteerriiaall tteessttiinngg ccoonnssuullttaanntt.. IIff ssppeecciiaall

Q6

Please confirm whether Labor Compliance services are included or whether scope of work is limited to coordinating with the City's Labor Compliance and CWA consultant.

AA66 SSccooppee ddooeess nnoott iinncclluuddee LLaabboorr CCoommpplliiaannccee sseerrvviicceess oorr ccoooorrddiinnaattiinngg wwiitthh CCiittyy’’ss

Q7

What is the administrative process for depositing money into the Union Benefit Trust Fund for a non-Union firm? Can a non-Union firm pay fringe benefits into the Union Trust on behalf of non-Union employees? AA77

AA ssuubbssccrriippttiioonn aaggrreeeemmeenntt mmuusstt bbee ssiiggnneedd aanndd aann aaccccoouunntt rreeggiisstteerreedd ffoorr tthhee eemmppllooyyeeee ppeerrffoorrmmiinngg ccoovveerreedd wwoorrkk.. TThhee llooggiissttiiccss ffoorr ddeeppoossiittiinngg ffuunnddss ttoo tthhee City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 52

ADDENDUM ACKNOWLEDGMENT
City of Anaheim
Addendum No. 1, Dated May 22, 2025
Request for Proposals (RFP) to provide Consulting Inspection Services

Page 22 of 44 ends

AA77
uunniioonn ttrruusstt wwiillll bbee ddeessccrriibbeedd iinn mmoorree ddeettaaiill sshhoorrttllyy aafftteerr eeaacchh pprree--jjoobb ccoonnffeerreennccee ffoorr ccoovveerreedd pprroojjeecctt wwoorrkk.. SSeeee SSeeccttiioonn 22..77..22 ooff tthhee CCWWAA ffoorr mmoorree ddeettaaiillss.. AA nnoonn--uunniioonn ffiirrmm ccaann ppaayy ffrriinnggee bbeenneeffiittss ttoo tthhee uunniioonn oonn bbeehhaallff ooff nnoonn--uunniioonn eemmppllooyyeeeess..

Q8

Our company currently pays our employees for fringe benefits within our Benefits Program, therefore, the “Union benefits” will be considered a Direct Cost to our firm. Are these costs to be included in the Labor Rates or can they be billed as an ODC?
AA88 AAnnyy ffeeeess oorr cchhaarrggeess nneeeedd ttoo bbee iinncclluuddeedd iinn tthhee eemmppllooyyeeee oorr ccllaassssiiffiiccaattiioonn rraattee tthhaatt iiss ssuubbmmiitttteedd aass ppaarrtt ooff tthhee rraattee sscchheedduullee..

Q9

Is the City going to require that we discontinue paying our covered employees our own benefits and replace them with the monies going into the Union Trust? If not, our bill rates will increase substantially as a result of paying double benefits.

AA99 TThhee CCiittyy ddooeess nnoott rreeqquuiirree ddiissccoonnttiinnuuaattiioonn ooff bbeenneeffiittss ttoo eemmppllooyyeeeess ppeerrffoorrmmiinngg ccoovveerreedd wwoorrkk..

Q10

Since employees are not required to join the Union, per the CWA, can non- Union employees participate in the Union Benefit Programs for the funds deposited on their behalf?
AA1100 YYeess,, nnoonn--uunniioonn eemmppllooyyeeeess ccaann ppaarrttiicciippaattee iinn uunniioonn bbeenneeffiitt pprrooggrraammss pprroovviiddeedd tthheeyy mmeeeett tthhee mmiinniimmuumm rreeqquuiirreemmeennttss ooff tthhee pprrooggrraamm..

Q11

Section 3.9: Regarding “Core Employees”, if the Union Hall does not have a qualified inspector for the project, can a second “Core Employee” from the Consultant be used as “any other available source”?
AA1111 YYeess,, iiff tthhee uunniioonn ccaannnnoott pprroovviiddee aann eemmppllooyyeeee,, aannootthheerr ccoorree eemmppllooyyeeee ccaann bbee uusseedd..

Q12

The RFP states “The City may amend the CWA to incorporate minor modifications after proposal submissions. The minor modifications are anticipated to make certain CWA requirements more accommodating without substantially changing the CWA’s terms and conditions. Minor modifications, if any, are anticipated to be finalized and incorporated into the CWA prior to award of these consulting agreements.”
a. What does the City consider “minor modifications”?
b. What “minor modifications” are being considered?
AA1122 TThhee CCiittyy ddooeess nnoott aannttiicciippaattee aannyy mmooddiiffiiccaattiioonnss ttoo tthhee CCWWAA aatt tthhiiss ttiimmee..

Q13

As a non-union company, will a consultant who hires employees through the union referral program (union employees) be required to participate in the union grievance process identified in Article 10 of the CWA? AA1133 YYeess..

Q14

Consultant employees are paid on a bi-weekly basis; will the consultant be required to pay employees hired through the union referral program (union employees) on a weekly basis?
AA1144

TThhee DDIIRR aalllloowwss bbii--wweeeekkllyy ppaayymmeennttss bbyy ccoonnttrraaccttoorrss ttoo iittss wwoorrkkeerrss,, hhoowweevveerr aanndd iiff tthhee pprroojjeecctt iiss eeiitthheerr ffuullllyy ffuunnddeedd oorr ppaarrttiiaallllyy ffuunnddeedd bbyy FFeeddeerraall FFuunnddss,, City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 53

ADDENDUM ACKNOWLEDGMENT
City of Anaheim
Addendum No. 1, Dated May 22, 2025
Request for Proposals (RFP) to provide Consulting Inspection Services

Page 33 of 44 ends

AA1144
tthhee wwoorrkkeerrss aarree ttoo bbee ppaaiidd oonn aa wweeeekkllyy bbaassiiss aass tthhee FFeeddeerraall RReegguullaattiioonnss rreeqquuiirree ssuubbmmiissssiioonn ooff CCPPRRss oonn aa wweeeekkllyy bbaassiiss..

Q15

The first paragraph of Page 3 of 10 discusses “Support Services” to be provided. Is this an addition service to the Inspection Services requested, or a part of the Inspection Services?
AA1155 TThhee ffiirrsstt ppaarraaggrraapphh ooff ppaaggee 33 rreeffeerrss ttoo ssuuppppoorrtt sseerrvviicceess aass ppaarrtt ooff tthhee IInnssppeeccttiioonn SSeerrvviicceess..

Q16

Some duties listed in the “Typical Duties & Responsibilities” section include duties not “standard” for Construction Inspectors, including preparation of weekly statement of working days and review of shop drawings. Can you please clarify/confirm that these are indeed required to be performed by our inspectors?
AA1166 IInnssppeeccttoorrss wwoouulldd bbee rreeqquuiirreedd ttoo pprreeppaarree tthhee wweeeekkllyy ssttaatteemmeenntt ooff wwoorrkkiinngg ddaayyss ffoorr CCiittyy ssttaaffff ttoo rreevviieeww,, aacccceepptt aanndd sseenndd ooffff ttoo tthhee ccoonnttrraaccttoorr ppeerrffoorrmmiinngg ccoonnssttrruuccttiioonn wwoorrkk..

Q17

A “Desired Knowledge & Experience” requirement is “Thorough knowledge of change order analysis, critical path scheduling, including the ability to evaluate schedules submitted by contractors and to evaluate and anticipate downstream impacts to those schedules during construction.” As this is not a something that construction inspectors typically deal with, can you please clarify this requirement?
AA1177 IItt iiss aa ddeessiirreedd kknnoowwlleeddggee tthhaatt iinnssppeeccttoorrss hhaavvee aann uunnddeerrssttaannddiinngg ooff iitt bbuutt nnoott aa rreeqquuiirreemmeenntt..

Q18

Page 7 of 10 ends

Participation Level for current and succeeding DBE program years.” Could you please clarify this requirement? Is there a DBE participation requirement for this contract?
AA1188 TThhiiss wwoouulldd oonnllyy aappppllyy ddeeppeennddiinngg oonn tthhee ffuunnddiinngg ssoouurrccee aanndd iitt wwiillll bbee aa ccaassee bbyy ccaassee.. SSppeecciiffiicc rreeqquuiirreemmeennttss wwoouulldd bbee pprroovviiddeedd ddeeppeennddiinngg oonn tthhee ffuunnddiinngg ssoouurrccee..

Q19

What is the duration of this contract?
AA1199 TThhee iinniittiiaall tteerrmm iiss ttwwoo ((22)) yyeeaarrss,, uunnlleessss ssoooonneerr tteerrmmiinnaatteedd wwiitthh tthhee DDiirreeccttoorr ooff PPuubblliicc WWoorrkkss aauutthhoorriittyy ttoo aallllooww ffoorr nnoo mmoorree tthhaann ttwwoo((22)) aaddddiittiioonnaall ttwwoo ((22)) yyeeaarr tteerrmmss aafftteerr tthhee iinniittiiaall tteerrmm.. RReeffeerr ttoo tthhee TTEERRMM SSeeccttiioonn ooff ssaammppllee aaggrreeeemmeenntt..

RREESSPPOONNSSEE SSUUBBMMIISSSSIIOONN DDEEAADDLLIINNEE IISS EEXXTTEENNDDEEDD TTOO FFRRIIDDAAYY,, MMAAYY 3300,, 22002255,, AATT 55::0000 PPMM

End of Addendum

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 54

ADDENDUM ACKNOWLEDGMENT
City of Anaheim
Addendum No. 1, Dated May 22, 2025
Request for Proposals (RFP) to provide Consulting Inspection Services

Page 44 of 44 ends

The Prospective Consultant shall acknowledge receipt of all addenda by signing and enclosing each addendum form in its proposal submittal. Failure to do so may result in a rejection of his/her submittal.

Signature Print Name
Firm Name Date
Jeffrey M. Cooper, PE
5/28/25NV5, Inc.

City of Anaheim Department of Public Works | Consulting Inspection Services NV5 | 55