May 9, 2025

CITY OF ANAHEIM PUBLIC UTILITIES

CREW QUARTERS BUILDING
VOLUME 3 Price Proposal
+

City of Anaheim Crew Quarters Building
38 Price Proposal Form

CREW QUARTERS BUILDING
PROPOSAL TO:

CITY OF ANAHEIM (COA)
200 S. Anaheim Blvd.

Anaheim, CA 92805
PROPOSAL FROM:

DESIGN-BUILDER
________________________________________________________ (Name of Firm Submitting Proposal)
________________________________________________________ (Street Address, City, State, Zip Code)
__________________________________________________
(Telephone)
__________________________________________________
(Design-Builder Project Executive Name & Title)
__________________________________________________
(Design-Builder Project Executive Email Address)
__________________________________________________
(Design-Builder Project Executive Telephone)
___________________________________________________
(Date Submitted)
Note: All portions of this Price Proposal Form must be completed and must include the signed Declaration on the last page of this form before the Proposal is submitted. Failure to execute the Declaration will result in the Proposal being rejected as nonresponsive.

Daniel Luker, Project Executive
13520 Evening Creek Drive, North Suite 270, San Diego, CA 92128 Balfour Beatty Construction LLC
(858) 635-7400
[email protected]
(858) 414-8106
May 9, 2025
City of Anaheim Crew Quarters Building
39 1.0 Proposer’s Representation
Proposer, represents that a) it has the appropriate active Contractor's license required by the State of California; b) it has carefully read and examined the Proposal Documents for the proposed Work on this Project; c) it has examined the site of the proposed Work and all Reference Documents; d) it has become familiar with all the conditions related to the proposed Work, including the availability of labor, materials, and equipment; e) that all information and submittals provided as part of the prequalification process are accurate and correct; and f) Proposer and all Subcontractors, regardless of tier, are currently registered with the California Department of Industrial Relations pursuant to California Labor Code Section 1725.5 and 1771.1. Proposer hereby offers to furnish all labor, materials, equipment, tools, transportation, and services necessary to complete the proposed Work on this Project in accordance with the Contract Documents for the sums quoted. Proposer further agrees that it will not withdraw its Proposal within 180 days after the Proposal Deadline, and that, if it is selected as the apparent lowest responsive and responsible Proposer, that it will, after receipt of notice of selection, sign and deliver to COA the Design-Build Agreement in triplicate and furnish to COA all items required by the Proposal Documents. If awarded the Contract, Proposer agrees to complete the proposed Work within the number of days specified in the Design-Build Agreement.

2.0 Addenda
Proposer acknowledges that it is Proposer's responsibility to ascertain whether any Addenda have been issued and if so, to obtain copies of such Addenda from COA at the appropriate address stated. Proposer therefore agrees to be bound by all Addenda that have been issued for this Proposal.

Addendum 1 Date Acknowledge
Addendum 2 Date Acknowledge

3.0 DESIGN-BUILD ENTITY’S PRICE PROPOSAL
Total Price Proposal
$ , , *
(Place figures in appropriate boxes)
*Proposer includes the following allowances in the Price Proposal:

Allowance No. 1: Allow $600,000 for Owner Design Directives Allowance No. 2: Allow $300,000 for permitting & CEQA Mitigation Measures Allowance No. 3: Allow $1,100,000 for Unforeseen Field Conditions 2 7
9 0
0 0
0 0

3.0 DESIGN-BUILD ENTITY’S PRICE PROPOSAL
Total Price Proposal
$ , , *
(Place figures in appropriate boxes)
*Proposer includes the following allowances in the Price Proposal:

Allowance No. 1: Allow $600,000 for Owner Design Directives Allowance No. 2: Allow $300,000 for permitting & CEQA Mitigation Measures Allowance No. 3: Allow $1,100,000 for Unforeseen Field Conditions 2 7
9 0
0 0
0 0
Addendum 1 Date Acknowledge
Addendum 2 Date Acknowledge
Addendum 1 Date Acknowledge
Addendum 2 Date Acknowledge
3 4
5 6
x
x
x
x
x
x
3/20/2025
3/6/2025
4/2/2025
4/8/2025
4/18/2025
4/28/2025
City of Anaheim Crew Quarters Building
40 4.0 Alternatives
Provide all design, engineering, coordination, labor, materials, equipment, accessories, and Design Builder and subcontractor overhead, mark-up, and profit required for the following Alternates. Indicate by marking only one of the three boxes (“Add”, “Deduct”, or “No Change”) and state the amount by placing figures in the corresponding boxes. Check the “No Change” box when there is no change in the Price Proposal. No amount is required if the “No Change” box is selected. Failure to quote an amount or check “No Change” or the insertion of any words that qualify the Price Proposal will result in the Proposal being rejected as nonresponsive. No extension of time will be granted if the Alternate is accepted.

Note: All Alternates are not included in the scoring calculation.

Voluntary Proposed
Alternate No. 1 (use for
LEED if applicable, if not
use as needed)
$ , , (Place figures in appropriate boxes.)
The city reserves the right to accept this alternate within 90 days of Notice to Proceed for Phase 1.
☐ Add
☐ Deduct
☐ No Change
Voluntary Proposed
Alternate No. 2 $ , , (Place figures in appropriate boxes.)
The city reserves the right to accept this alternate within 90 days of Notice to Proceed for Phase 1.
☐ Add
☐ Deduct
☐ No Change
Voluntary Proposed
Alternate No. 3 $ , , (Place figures in appropriate boxes.)
The city reserves the right to accept this alternate within 90 days of Notice to Proceed for Phase 1.
☐ Add
☐ Deduct
☐ No Change
Voluntary Proposed
Alternate No. 4 $ , , (Place figures in appropriate boxes.)
The city reserves the right to accept this alternate within 90 days of Notice to Proceed for Phase 1.
☐ Add
☐ Deduct
☐ No Change
[Additional Voluntary Alternates may be attached on a separate form] Additional EV Parking Stalls within
Current Panel/Service Size for Fleet
Vehicle Area
Fleet Vehicle Parking with Concrete in
lieu of Asphalt
Additional Electrical Hook-Up for
Food Truck Parking Located Directly
Adjacent to Courtyard
2 2
2 7
4 1
8 1
1 0
4 8
7 4
9 7
1 5
5 7
9 x
x
x
x

5 6
7 8
9 10
11 12
Organic Opening in Steel Trellis to
Match Landscape
Custom Form-liner/Graphic at the
Northwest Corner of the Building
Provision of a Temporary Generator
Point of Connection at the Exterior
of the Main Electrical Room
Upsizing of Laterals/POC's/Services
for Future Site Expansion
Copper Bussing in Electrical
Panels and Switchboards
LEED Advanced Metering
Wireless Lighting Controls
Rooftop Package Units in lieu
of VRF
1 6
8 5
6 1
5 8
4 8
2 6
3 7
0 1
2 2
5 1
4 8
3 6
3 2
5 4
0 7
6 5
4 6
0 1
3 2
5 4
1 1
6 x
x
x
x
x
x
x
x

13 14
15 Onsite Sewer Lateral Connection
Remove Resource-Loaded
Schedule Requirement
City of Anaheim Public Utilities
Coverage of Temporary Utility Costs
3 1
7 9
7 3
3 3
6 0
6 7
0 0
0 x
x
x
City of Anaheim Crew Quarters Building
41 5.0 Proposer Information
TYPE OF ORGANIZATION: ____________________________________________________________ (Corporation, Partnership, Individual, Joint Venture, etc.) If a Corporation, the Corporation is organized under the laws of the State of:
(State)
President of the Corporation: ____________________________________________ (Name)
Name of Secretary of the Corporation: _____________________________________ (Name)
If a Partnership or Joint Venture, names and titles of persons signing the bid on behalf of proposer and all general partners:

Persons signing the bid on behalf of Proposer: _____________________________________________ (Name & Title)
General Partners: ________________________________________________________________ (Name & Title)

CALIFORNIA CONTRACTORS
LICENSE(S):
__________________________________
(Name of Licensee)
(Classification) (License Number) (Expiration Date)
For Joint Venture, list Joint Venture's license and licenses for Joint Venture partner:
(Name of Licensee)
(Classification) (License Number) (Expiration Date)
(Name of Licensee)
(Classification) (License Number) (Expiration Date)
Limited Liability Company (LLC)
California
Emily Kay
Jared Wayne
N/A
N/A
979126
Eric Stenman (A) and Kyle Frandsen (B)
A and B
12/31/2026
N/A
N/A

City of Anaheim Crew Quarters Building
Option of Cost
43 Opinion of Cost
REF NO. TRADE Cost

0.00 GENERAL CONDITIONS, OH & FEE

0.10 General Expenses $

0.20 Supervision, Fringes, Taxes & Surcharges $

0.30 Performance & Payment Bond $

0.40 Insurance $

0.50 All-Risk Builder's Risk Insurance $

0.60 Other: $
Subtotal: $

1.00 GENERAL REQUIREMENTS

1.01 Design Fee Through Schematic $

1.02 Design Fee Through Design Development $

1.03 Design Fee Through Construction Documents $

1.04 Design Fee Through Permit $

1.05 Design Fee for Construction Admin and Closeout $

1.06 Testing and Inspection $

1.07 Allowances $

1.08 Commissioning $

1.09 Water Quality Management Plan $

1.10 Mobilization $

1.11 Temporary Facilities/Fencing $

1.12 Off Site Staging $

1.13 Hoist Facilities $

1.14 Temporary Utilities $

1.15 Cleaning $

1.16 Protection & Safety $

1.17 Demobilization $

1.18 Trash Removal $

1.19 Safety $

1.20 Other: $
Subtotal: $

2.00 SITE

2.10 Earthwork $

2.20 Site Concrete $

2.30 Concrete Paving $

2.40 Asphalt $

2.50 Site Utilities Dry $

2.60 Site Utilities Wet $

2.70 Landscaping $

2.75 Fencing $

2.76 Irrigation $

2.90 Other: $
Subtotal: $
52,8643.00
2,622,018.00
369,352.00
443,222.00
406,287.00
92,669.00
4,462,190.98
571,389.00
541,620.00
844,790.00
61,416.00
642,930.00
101,552.00
2,000,000.00
40,390.00
106,745.00
99,288.00
299,863.00

0.00 0.00
214,219.50
79,337.50

0.00 66,192.00
34,420.00
75,128.00
72,471.32
5,851,751.32
577,346.20
519,029.43

0.00 394,155.40

0.00 847,583.00
563,613.82

0.00 84,200.04
230,493.00
3,216,420.89
City of Anaheim Crew Quarters Building
Option of Cost
44 3.00 CONCRETE

3.10 Cast in Place Concrete $

3.20 Architectural Concrete $

3.30 Precast Architectural Concrete $

3.40 Other: $
Subtotal: $

4.00 MASONRY

4.10 Unit Masonry $

4.20 Brick Veneer Masonry $
Subtotal: $

5.00 METALS

5.10 Structural Steel Framing $

5.20 Metal Framing $

5.30 Metal Fabrications $

5.40 Metal gates $

5.50 Handrails $

5.60 Other: $
Subtotal: $

6.00 WOOD, PLASTICS, AND COMPOSITES

6.10 Miscellaneous Carpentry $

6.20 Sheathing $

6.30 Interior Architectural Woodwork $

6.40 Other: $
Subtotal: $

7.00 THERMAL AND MOISTURE PROTECTION

7.10 Thermal Insulation $

7.20 Roofing $

7.30 Sheet Metal Flashing and Trim $

7.40 Roof Accessories $

7.50 Joint Sealants $

7.60 Other: $
Subtotal: $

8.00 OPENINGS

8.10 Doors Frames and Hardware $

8.20 Windows $

8.30 Other: $
Subtotal: $

9.00 FINISHES

9.10 Gypsum Board Assemblies $

9.20 Non-Structural Metal Framing $

9.30 Portland Cement Plastering $
609,078.00

0.00 860,461.00
359,138.08
1,828,677.08

0.00 0.00

0.00 1,015,018.23

0.00 10,038.73

0.00 0.00
81,424.78
1,106,481.74
5,770.00

0.00 90,937.00

0.00 96,707.00

64.935.00
557,321.00
127,874.00
17,310.00
36,075.00
64,936.00
868,451.00
245,190.00
656,040.00

0.00 901,230.00
350,000.00
530,990.00

0.00 City of Anaheim Crew Quarters Building
Option of Cost
45 9.40 Tiling $

9.50 Acoustical Panel Ceilings $

9.60 Flooring $

9.70 Interior Painting $

9.80 High-Performance Coatings $

9.90 Other: $
Subtotal: $

10.00 SPECIALTIES

10.10 Interior Signage $

10.20 Exterior Signage $

10.30 Toilet Compartments $

10.40 Operable Partitions $

10.50 Wall and Door Protection $

10.60 Toilet Accessories $

10.70 Fire Protection Specialties $

10.80 Other: $
Subtotal: $

11.00 EQUIPMENT

11.10 Access Gate $

11.20 Trash Area $

11.30 Solar Equipment $

11.40 Other: $
Subtotal: $

12.00 FURNISHINGS

12.10 Window coverings $

12.20 Site Furnishings $

12.30 Other: $
Subtotal: $

14.00 CONVEYING EQUIPMENT (not used)

21.00 FIRE SUPPRESSION

21.10 Fire Sprinkler System $
Subtotal: $

22.00 PLUMBING

22.10 Plumbing $
Subtotal: $

23.00 HEATING VENTILATING AND AIR CONDITIONING

23.10 Common Work Results for HVAC $

23.20 Testing, Adjusting, and Balancing for HVAC $

23.30 Commissioning of HVAC $
205,961.00
527,369.00
190,853.00
196,538.00

0.00 48,468.00
2,050,179.00
11,540.00
44,689.00
72,151.00

0.00 0.00

0.00 3,173.50
159,125.00
290,678.50

0.00 41,300.00

0.00 0.00
41,300.00
60,025.00

0.00 0.00
60,025.00
231,000.00
231,000.00
600,676.00
600,676.00
1,831,283.00
35,882.00
59,788.00
City of Anaheim Crew Quarters Building
Option of Cost
46 23.40 Instrumentation and Controls $
Subtotal: $

26.00 ELECTRICAL

26.10 General Electrical $

26.20 Lighting $

26.30 Solar panels inverters transfer switches $

26.40 Interior Lighting $

26.50 Exterior Lighting $

26.60 Low Voltage and Structured Cabling $

26.70 Communications $

26.80 AV $

26.90 Other: $
Subtotal: $
172,170.00
2,099,123.00
2,940,262.49
610,241.00
504,900.00

0.00 0.00
139,705.00

0.00 0.00

0.00 4,195,108.49

4980 North Harbor Dr
Suite 100
San Diego, CA 92106
T: 619.220.0984
www.millerhull.com
1 MacArthur Place
Suite 320
Santa Ana, CA 92707
T: 949.502.4000
www.balfourbeatty.com
+