Cities Index.
5. OC River Walk Master Plan

Anaheim City Council
December 9, 2025

Document
5. OC River Walk Master Plan
Meeting
December 9, 2025
Body
Anaheim City Council
Original file
918 KB
Text extracted from the city's file for reading and search. Open the original on local.anaheim.net. That file is the official record.

7 DRAFT – OC RIVER WALK CONCEPTUAL MASTER PLAN 2025 DRAFT – OC RIVER WALK CONCEPTUAL MASTER PLAN 2025 8

PARKING
DECK F
(FUTURE)

BUILDING
#6 (FUTURE)
BUILDING #5
(FUTURE)
BUILDING #1
(FUTURE)
BUILDING #2
(FUTURE)
BUILDING #4
(FUTURE)

MARKET &
OFFICE
(FUTURE)

PARKING
DECK B

CONCERT HALL
(FUTURE)
THE
STEPS
(FUTURE)
BUILDING #3
(FUTURE)
North 300'
KATELLA AVE. TO UNION PACIFIC RAILROAD REACH UNION PACIFIC RAILROAD TO ANAHEIM COVES REACH

STADIUM

PROMENADE THEATER
& RETAIL KINDER MORGAN ORANGE

TERMINAL

TAFT/MAIN

CORPORATE CENTER

OPEN SPACE
(FUTURE)

ANAHEIM COVES TRAIL
(EXISTING)
FUTURE

DEVELOPMENT
LOT B

POTENTIAL

FUTURE PARK
S.C.E.

EASEMENT

POTENTIAL
FUTURE
PARK
FUTURE
PARK

RIVER ROAD

S DOUGLASS ROAD

STANLEY CUP WAY

BALL ROAD

S PHOENIX CLUB DRIVE

ISLANDS GOLF

CENTER (OCWD)

BURRIS BASIN
(OCWD)

TAFT AVE
RIVER
Pedestrian/Bicycle
Bridge
River Recharge/
Impoundments
Riverbank
Modifications
Public Education/Art
Features
Trail Extension/ Pedestrian
Trail Separation

LOSSAN RAIL CORRIDOR
TO KATELLA AVE. REACHORANGEWOOD AVE. TO LOSSAN RAIL CORRIDOR REACH

KATELLA AVE

LOSSAN RAIL CORRIDOR

UNION PACIFIC RAILROAD

ORANGEWOOD AVE

ARTIC STATION
(EXISTING)

HONDA CENTER
(EXISTING)

ANGEL STADIUM
(EXISTING)

PARKING
DECK A
(FUTURE)
OC
SHERIFF'S DEPT.

OC FLOOD

CONTROL DISTRICT

OC FLOOD

CONTROL DISTRICT

OC PUBLIC
WORKS

COUNTY OF
ORANGE

KATELLA

COMMERCE CTR

FUTURE RIVER PARK

COLLINS CHANNEL
HOTEL
(FUTURE)

FUTURE MEADOW

PARKFUTURE

DEVELOPMENT
HOTEL
(FUTURE)
HOTEL
(EXISTING)
HOTEL

SANTA ANA

OC RIVER WALK CONCEPTUAL MASTER PLAN LAYOUT
The Conceptual Master Plan serves as a planning document to guide the transformation of this 2-mile river corridor into an iconic recreational amenity with environmental benefits. The plan focuses on creating a safe, amenity-rich, walkable, and bikeable corridor that is directly linked to the ARTIC transportation hub, the river, and the surrounding neighborhoods. The river reaches are identified below.

COMMUNITY ACCESS

RECREATION EDUCATION

WATER SUPPLY

FLOOD PROTECTION

TRANSFORMATION

THROUGH

PARTNERSHIPS
57 RIVER ROAD
fil ~ ~~ 110 --- --- ~~ -
\
\
\
\
I
\
- \
I
\ ~;;:~_:r===J___,
//4\\ ••
.. · I
•• \\\"I -,
--
\\\Rf, .-, ,:> '-! ,v~·:;~~:\\
I
I \ ~ !
•
,•.,~I""·•\.• .
' ,,_,r~~
--~----./
i
G
ATTACHMENT NO. 5

← All documents from this meeting