CITY OF ANAHEIM

DESIGN-BUILD AGREEMENT
FOR

ANAHEIM WEST TOWER - ELEVATOR MODERNIZATION

DATED:

C

ITY OF ANAHEIM

PUBLIC WORKS DEPARTMENT
955 S. MELROSE AVENUE
ANAHEIM, CA 92805

DESIGN-BUILD AGREEMENT
Page A-1

DESIGN-BUILD AGREEMENT
This Design-Build Agreement ("Agreement") is made effective as of this day of ______________, 2026, by and between the City of Anaheim (“City” or “Owner”) and LIFTECH ELEVATOR SERVICES, LLC, a California limited liability company ("Design-Builder") for the design, management, and construction of the Anaheim West Tower Elevator Modernization Project ("Project"). In consideration of the mutual covenants and obligations contained herein, City and Design-Builder agree to the following terms and conditions.

RECITALS
WHEREAS, the City Charter and Chapter 10.06 of the Anaheim Municipal Code authorize the City to use design-build procurement for the design and construction of certain public works projects of the Public Works Department. Design -Builder shall perform, either directl y or through subcontracts, the services set forth in this Agreement and the Contract Documents; and
WHEREAS, City issued a Request for Proposals ("RFP") to select a design-builder to design, build and deliver to City certain improvements at the Project as described in, and in accordance with, the Scope of Services, complete with all appurtenances necessary to produce such facilities; and WHEREAS , City has selected Design-Builder for the Project based on its response to the RFP; and WHEREAS , Design-Builder warrants and represents that it is ready, willing and able to design and build the Project in strict accordance with the terms and conditions of the Agreement; and WHEREAS , Design -Builder warrants and represents that is has the necessary professional expertise and skill to perform such services.

NOW, THEREFORE, in consideration of the covenants hereinafter set forth, City and Design-Builder mutually agree as follows:

ARTICLE I

CONTRACT DOCUMENTS

1.1 Definitions
The meanings of all capitalized terms used in the Contract Documents and not otherwise defined herein are contained in the General Conditions. If not defined in the General Conditions, they shall have the meanings assigned to them elsewhere in the Contrac t Documents. If not defined in the General Conditions or elsewhere, they shall have the meanings reasonably understood to apply to them by the context of the portion of the Contract Documents where such terms are used. City and Design -Builder are sometime s individually referred to as a “Party” and collectively as the “Parties.” Except as indicated otherwise, all references to City include its elected officials, officers, directors, employees, agents and volunteers. Except as indicate d otherwise, all references to Design -Builder include its personnel, employees, agents and subcontractors.

1.2 Contract Documents
The "Contract Documents" are comprised of the following documents (not in order of precedence) , all of which are either attached hereto as exhibits or are incorporated herein by this reference with the same force and effect as if the same were set forth at length herein:

DESIGN-BUILD AGREEMENT
Page A-2

1.2.1 This Agreement, including all exhibits and attachments noted below, executed by City and Design- Builder:

Exhibit A – Site Legal Description
Exhibit B – Scope of Work and Index of Design Development Documents Exhibit C – Approved Deviations
Exhibit D – Design-Builder’s Key Personnel List
Exhibit E – Project Schedule
Exhibit F – Performance Bond
Exhibit G – Payment Bond
Exhibit H – Certification of Contractor and Subcontractor Department of Industrial Relations Registration Exhibit I – Designation of Subcontractors
Exhibit J - Community Workforce Agreement, as amended from time to time

1.2.2 General Conditions of the Contract;

1.2.3 All written modifications, amendments, minor changes, and Change Orders to this Agreement issued in accordance with the General Conditions of Contract;

1.2.4 Design and Performance Criteria comprised of the Scope of Work;

1.2.5 2024 Standard Specifications for Public Works Construction (“Standard Specifications”) by the Southern California Chapter, American Public Works Association and the Southern California District, Associated General Contractors of California Joint Cooperative Committee, as modified and supplemented by the City;

1.2.6 Design Development Documents to be prepared by the Design-Builder;

1.2.7 Request for Proposals (“RFP” or “Requests for Proposals”) and any addenda (“RFP Addenda”) which are all on file at the Public Works Department;

1.2.8 Design-Builder’s Proposal (including the Best and Final Offer) and Approved Deviations identified in Exhibit C hereto, if any, contained in the Design -Builder’s Proposal and approved by City , which shall specifically identify any and all deviations from the Design Development Documents and Request for Proposals; and

1.2.9 Final Construction Documents to be hereafter prepared by the Design-Builder that are approved by the City in writing in accordance with the terms of the Contract Documents.

1.2.10 Insurance documents comprised of certificate of insurance and endorsements approved by the City.

DESIGN-BUILD AGREEMENT
Page A-3

1.3 INTENTIONALLY OMITTED.

1.4 Entire Agreement
This Agreement together with all other Contract Documents constitutes the entire agreement between the Parties and all other representations or statements theretofore made, oral or written, are merged herein. Both Parties have, with the assistance of thei r respective legal counsel, drafted the provisions contained in the Agreement. Therefore, no provision in the Agreement will be construed in favor of or against any party by virtue of the identity of its preparer.

This Agreement may be amended only by wr itten modification executed by duly authorized representatives of the Parties hereto or according to the procedure set forth in the General Conditions. If any provision of this Agreement shall be held invalid, such invalidity shall not affect the other pr ovisions hereof and the provisions of this Agreement are intended to be and shall be deemed severable.

ARTICLE II

THE WORK

2.1 Scope of Work

2.1.1 Design-Builder shall provide, furnish, and perform all necessary planning, architectural, engineering, and all other design services of any type, procurement, permitting and support services, construction, landscaping, clean-up, and all other construction services of any type, provide and furnish all necessary supplies, materials , and equipment (except those to be provided by City, if any) and all necessary supervision, labor, and services required for the complete engineering, design, procurement, quality control/quality assurance, construction and all necessary installation, start -up and testing and commissioning required to complete the Work described in and reasonably inferable from the Contract Documents (hereinafter, the all-inclusive obligations of the Design-Builder set forth in this sentence shall be referred to as the "Work"). Except with regard to any material to be provided and/or installed by City, Design-Builder shall fully commission and turn over a complete operational, and fully functional Project to City. Without limiting the generality of this section, Design-Builder shall provide the following work and services:

2.1.2 Design-Builder shall prepare complete designs, engineering calculations, working drawings, shop drawings and generate detailed construction drawings and/or engineering analysis setting forth in detail the specifications and requirements for the purchasing and procurement of the services, materials, and equipment and for the construction of the complete, operational, and fully functional Project, and shall furnish the services of all necessary supervisors, engineers, designers, draftsmen, and other personnel necessary for preparation of those drawings and specifications required for the Work, including the pertinent information for natural gas, electrical, water supply, and any other utilities, as required.

2.1.3 Design-Builder shall provide, install and complete as specified and pay for all labor, materials and equipment, tools, supplies, construction equipment and machinery, construction, start -up and testing, wet and dry utilities, communications of all type, transportation, and other facilities and services (including any temporary materials, equipment, supplies and facilities) necessary for the proper execution and completion of the complete, operational, and fully functional Project, including the permanent interconnection for electricity, natural gas, water supply, and any other utilities, and demonstration of fully satisfactory operation of all systems and equipment.

2.1.4 Design-Builder shall plan, coordinate, supervise and direct the entirety of the Work, and shall furnish the services of all supervisors, forepersons, skilled and unskilled labor, and all other personnel necessary to design and construct the complete , operational, and fully functional Project. Design -Builder shall provide, manage and organize such personnel as necessary to complete the Work in accordance with all requirements of the Contract Documents.

DESIGN-BUILD AGREEMENT
Page A-4

2.1.5 Design-Builder shall obtain, a t Design-Builder's expense, all governmental and private approvals, licenses, and permits required to complete the Work. Design-Builder shall design and construct a complete, operational and fully functional Project in full compliance with all applicable laws, codes , and standards (both public and private), including but not limited to, the standards and warranties included and/or expressed in the Contract Documents and manufacturer's recommendations pertaining to individual items of equipment or systems.

2.1.6 All subcontractors shall hold the appropriate California C-specialty, A-General engineering contractor license or engineering license, indicated on the Subcontractor list and declaration (Exhibit I) at the time of award of the Contract and shall maintain licenses at all times during the duration and performance of work.

2.2 Standard of Performance
In addition to and without limiting Design -Builder's other obligations under the Contract Documents, Design -Builder shall at all times in its performance of its obligations under the Contract Documents conform to the following general standards of performance:

2.2.1 Comply with the requirements of the Contract Documents;

2.2.2 Comply with Applicable Laws;

2.2.3 Conform to the standard of care applicable to those who provide design -build project services and construction of the type called for by this Agreement for projects of a scope and complexity that is comparable to the Project;

2.2.4 Furnish efficient business administration of the Work, utilizing sufficient senior level management and other qualified personnel to manage the Work; and

2.2.5 Apply its best and highest skill and attention to completing the Work in an expeditious and economical manner, consistent with the expressed best interests of City and within the limitations of the Contract Price and Contract Time.

ARTICLE III

TIME FOR PERFORMANCE

3.1 Contract Time
Design-Builder agrees to commence the Work within five (5) days of Design -Builder’s receipt of a Notice to Proceed issued by City (“Date of Commencement”), unless the parties mutually agree otherwise in writing. If City's issuance of a Notice to Proceed is delayed due to Design -Builder's failure to return a fully -executed Agreement, insurance documents or bonds within fourteen (14) calendar days after the date of the award of the Contract letter from the City, one (1) calendar day will be deducted from the number of days to achieve Substantial Completion of the Work for every day of delay in City's receipt of such documents. This right is in addition to and does not affect City's right to demand forfeiture of Design-Builder's bid security, or any other rights or remedies available to City if Design-Builder persistently delays in providing the required documentation.

Design-Builder agrees to promptly commence the Work after the Notice to Proceed is issued by City , and to achieve Substantial Completion of the entire Work no later tha n 450 working days after the Date of Commencement in the Notice to Proceed. Final Completion of the Work shall be achieved as expeditiously as reasonably practicable. Final Completion is the date when all Work is complete pursuant to the definition of Final Completion set forth in Article

1.1.24 of the General Conditions of Contract. All of the dates set forth in the Article (collectively “Contract Time”) shall

DESIGN-BUILD AGREEMENT
Page A-5
be subject to adjustment in accordance with the General Conditions of Contract. By executing this Agreement, Design- Builder confirms that the Contract Time is a reasonable period for performing the Work.

3.2 Liquidated Damages

3.2.1 City and Design-Builder recognize that time is of the essence as to this Agreement and that City may suffer damages which are difficult to determine and accurately specify, such as lost grant funds, additional contract administration expenses, and loss of public use, if the Work is not com pleted within the Contract Time, including any extensions thereof allowed in accordance with the Contract Documents.

3.2.2 Design-Builder and City agree to liquidate damages with respect to Design -Builder's failure to achieve Substantial Completion of the Work within the Contract Time. The Parties intend for the liquidated damages set forth herein to apply to this Contract as set forth in Governmen t Code § 53069.85. Design-Builder acknowledges and agrees that the liquidated damages are intended to compensate City solely for Design-Builder's failure to meet the deadline for Substantial Completion and shall not excuse Design-Builder from liability from any other breach, including any failure of the Work to conform to the requirements of the Contract Documents.

3.2.3 In the event that Design- Builder fails to achieve Substantial Completion of the Work within the Contract Time, Design-Builder agrees to pay City the following:
(a) $1,000 per day for each calendar day that Substantial Completion is delayed for the first thirty (30) days of delay; and
(b) $1,000 per day for each calendar day that Substantial Completion is delayed thereafter.

3.2.4 Design-Builder acknowledges and agrees that the foregoing liquidated damages have been set based on an evaluation by City of damages that it will incur in the event of the late completion of the Work. Design - Builder and City agree that because of the nature of the Project it would be impractical or extremely difficult to fix the amount of actual damages incurred by City due to a delay in completion of the Work. Accordingly, City and Design- Builder have agreed to such liquidated damages to fix Design -Builder's costs and to avoid later disputes. It is understood and agreed by Design-Builder that any liquidated damages payable pursuant to this Agreement are not a penalty and represent a fair and reasonable estimate of compensation for losses to be incurred under the circumstances existing as of the effective date of this Agreement.

3.2.5 It is further mutually agreed that City shall have the right to deduct liquidated damages against progress payments or retainage. In the event the remaining unpaid Contract Price is insufficient to cover the full amount of liquidated damages, Design-Builder shall pay the difference to City.

3.2.6 Permitting or requiring Design-Builder to continue and finish the Work, or any part thereof, after the deadline for Substantial Completion shall not act as a waiver of City ’s right to receive liquidated damages hereunder or any rights or remedies otherwise available to City.

ARTICLE IV

CONTRACT PRICE

4.1 Contract Price

4.1.1 Total Compensation. City shall pay Design-Builder for D esign-Builder's complete performance of the Work in accordance with the Contract Documents the Contract Price not to exceed Three Million, Four Hundred Forty-Five Thousand, Three Hundred Thirty -Seven Dollars and 50/100 Cents ($ 3,445,337.50). The Base Contract Price is Three Million, One Hundred Thirty -Two Thousand, One Hundred Twenty -Five Dollars and 00/100 Cents

DESIGN-BUILD AGREEMENT
Page A-6
($3,132,125.00). In addition, the Director of Public Works is authorized to approve additional expenditures to be paid to Design-Builder for Extra Work not included in the Scope of Services, in the amount of up to ten percent (10%) of the Base Contract Price provided above, if the Director of Public Works determines, in their sole discretion, that the additional Extra Work is necessary for the successful completion of the Services . The amount of the Extra Services amount is not to exceed Three Hundred Thi rteen Thousand, Two Hundred Twelve Dollars and 50/100 Cents ($313,212.50).

4.1.2 Intentionally Omitted.

4.1.3 The Contract Price is the total amount payable by City to Design-Builder for performance of the Work under the Contract Documents and is deemed to cover all costs arising out of or related to the performance of the Work, including, without limitation, the effects of natural elements upon the Work, unforeseen difficulties or obstructions affecting the performance of the Work (including, without limitation, unforesee n conditions at the Site that do not constitute Differing Site Conditions) , and fluctuations in market conditions and price escalations (whether occ urring locally, nationally , or internationally) from any cause, including, without limitation, causes beyond th e control or foreseeability of Design-Builder.

4.2 Payment

4.2.1 Schedule of Values. The Design-Builder shall submit to the City for review a detailed Sche dule of Values allocating the entire Contract Price in accordance with requirements set forth in Section 10.2 of General Conditions.

4.3 Allowance Items and Allowance Values

4.3.1 Any and all Allowance Items, as well as their corresponding Allowance Values, are set forth in the submitted Price Form.

4.3.2 Design-Builder and City have worked together to review the Allowance Items and Allowance Values based on design information then available to determine that the Allowance Values constitute reasonable estimates for the Allowance Items. Design-Builder and City will continue working closely together during the preparation of the design to develop Construction Documents consistent with the Allowance Values. Nothing herein is intended in any way to constitute a guarantee by Design-Builder that the Allowance Item in question can be performed for the Allowance Value.

4.3.3 No work shall be performed on any Allowance Item without Design -Builder first obtaining in writing advanced authorization to proceed from City. City agrees that if Design-Builder is not provided written authorization to proceed on an Allowance Item by the date set forth in the Project schedule, due to no fault of Design-Builder, Design- Builder may be entitled to an adjustment of the Contract Time and Contract Price.

4.3.4 The Allowance Value for an Allowance Item includes the direct cost of labor, materials, equipment, transportation, taxes and insurance associated with the applicable Allowance Item. All other costs, including design fees, Design-Builder's overall project management and general conditions costs, overhead and fee, are deemed to be included in the original Contract Price, and are not subject to adjustment, regardless of the actual amoun t of the Allowance Item.

4.3.5 Whenever the actual costs for an Allowance Item is more than or less than the stated Allowance Value, the Contract Price shall be adjusted accordingly by Change Order, in accordance with the General Conditions.

The amount of the Change Order shall reflect the difference between actual costs incurred by Design -Builder for the particular Allowance Item and the Allowance Value.

DESIGN-BUILD AGREEMENT
Page A-7

ARTICLE V

DESIGN-BUILDER'S REPRESENTATIONS AND WARRANTIES
In order to induce City to enter into this Agreement, Design-Builder makes the following representations and warranties:

5.1 Design-Builder has and throughout the term of the Contract shall maintain all required authority, license status, professional ability, skills and capacity to perform Design -Builder’s obligations hereunder and shall perform them in accordance with the requirements contained in the Contract Documents.

5.2 Design-Builder has visited the Site and has reasonably examined the nature and extent of the Work, Site, locality, impact(s) to adjoining private property, actual conditions, as-built conditions, and all local and federal, state and local laws and regulations that in any manner may affect cost, progress, performance or furnishing of Work or which relate to any aspect of the design and /or the means, methods, techniques, sequences or procedures of construction to be employed by Design-Builder and safety precautions and programs incident thereto.

5.3 Design-Builder has reasonably examined all reports of exploration and tests of subsurface conditions, as-built drawings, other drawings or reports, available for design and construction purposes, of physical conditions, or which may be apparent at the Site and accepts the criteria set forth in these documents and the General Conditions to the extent of the information contained in these documents upon which Design-Builder is entitled to rely. Design -Builder agrees that except for the information so identified, Design-Builder does not and shall not rely on any other information contained in these documents.

5.4 After contract award, Design -Builder, will conduct or obtain any additional examinations, investigations, explorations, tests, reports and studies, including but not limited to geotechnical investigations, upon which the design will be based, that pertain to the surface and subsurface conditions, as -built conditions, underground facilities and all other physical conditions at or contiguous to the Site as Design -Builder considers necessary for the performanc e or furnishing of Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents.

5.5 All design and engineering services furnished by Design -Builder shall be performed by or under the supervision of persons licensed to practice architecture, engineering or surveying (as applicable ) in the State of California, by personnel who are skilled, experienced and competent in their respective trades or professions, who are professionally qualified to perform the Work in accordance with the Contract Documents and who shall have professional responsibility for the accuracy and completeness of the desi gn documents and construction documents prepared or checked by them.

5.6 Design-Builder has given City prompt written notice of all conflicts, errors, ambiguities, or discrepancies that it has discovered at any time in or among the Contract Documents and as-built drawings and actual conditions and the written resolution thereof through Addenda issued by City is acceptable to Design-Builder.

5.7 Design-Builder is duly organized, existing and in good standing under applicable state law, and is duly qualified to conduct business in the State of California.

5.8 Design-Builder has duly authorized the execution, delivery and performance of this Agreement, the other Contract Documents and the Work to be performed herein. The Contract Documents do not violate or create a default under any instrument, agreement, order or decree binding on Design-Builder.

5.9 Design-Builder represents and warrants that it is aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self -insurance in accordance with the provisi ons of that code, and Design -Builder agrees to comply with such provisions before

DESIGN-BUILD AGREEMENT
Page A-8
commencing the performance of the work of this Contract and at all times during the term hereof, whether by provision of its own insurance or self-insurance.

5.10 Design-Builder shall comply with all requirements of any Quality Control/Quality Assurance Plan accepted by City.

5.11 At all times during the term hereof, including during the course of, and notwithstanding the existence of any dispute, Design-Builder shall perform as directed by City, in a diligent manner and without delay, shall abide by City’s decision or order, and shall comply with all applicable provisions of the Contract Documents.

5.12 Design-Builder confirms its intent to include in the Project the prequalified subcontractors, who were listed in the Design-Builder's Proposal. Design-Builder acknowledges its responsibility to provide C ity with a complete and updated list of subcontractors as they become known on the Project, and that such listing shall be in accordance with the requirements of California Public Contract Code § 20133 et seq. Specifically, California Public Contract Code Section 20133(f) requires that all subcontractors not listed by Design -Builder in its submission in response to the Request for Proposals be awarded in accordance with the design -build process set forth by C ity. The City process allows the selection of subcontractors based upon the best value to the Project and requires the Design -Builder do both of the following: (1) Provide public notice of the availability of wo rk to be subcontracted in accordance with the publication requirements applicable to the competitive bidding process of the C ity; and (2) Provide a fixed date and time on which the subcontracted work will be awarded in accordance with the procedure established pursuant to Public Contract Code Section 20133(f).

ARTICLE VI

BONDS AND INSURANCE

6.1 Insurance
Design-Builder shall procure the insurance coverages in accordance with Article 13 of the General Conditions of Contract.

6.2 Bonds and Other Performance Security

6.2.1 Design-Builder shall furnish a Performance Bond and a Payment Bond in the forms provided in Exhibits F and G, respectively, or on any other form provided by City or approved by City. Design-Builder shall deliver to City, not later than fourteen (14) calendar days after the date of the award of the C ontract letter issued by City, evidence satisfactory to City that Design-Builder is capable of furnishing the Bonds. The Performance Bond shall be furnished as a guarantee of the faithful performance of the req uirements of the Contract D ocuments (including the obligation to pay liquidated damages) in an amount equal to one-hundred percent (100%) of the Contract Price. The Payment Bond shall secure payment of all claims, demands, stop payment notices, mechanics liens, or charges of material suppliers, mechanics or laborers employed by Design-Builder or by any Subcontractor or any person, form, or entity eligible to file a stop payment notice with respect to the Work in an amou nt equal to one- hundred percent (100%) of the Contract Price. Design-Builder shall maintain the Payment Bond in full force and effect until (a) Design- Builder has obtained unconditional releases pursuant to Civil Code § 8138 from all claimants who filed preliminary notice of a claim against the bond, or (b) expiration of the statutory period for claims against the bond. Bonds may be obtained through Design-Builder’s usual source and the cost thereof shall be included in the Contract Price.

6.2.2 The bonds shall be executed by California admitted surety with an A.M. Best Company minimum rating of no less than “A:IX” . If an A.M. Best rating is not available, the proposed surety must meet comparable standards of another rating service satisfactory to City. Bonds issued by a California admitted surety listed in the latest version of the U.S. Department of Treasury Circular 570 shall be deemed to be accepted unless specifically rejected

DESIGN-BUILD AGREEMENT
Page A-9
by City. Bonds from a California admitted surety not listed in Treasury Circular 570 must be accompanied by all the documents enumerated in California Code of Civil Procedure § 995.660(a).

6.2.3 All such bonds shall be accompanied by a power of attorney for the surety company authorizing the person executing the bond to sign on behalf of the company. If the bonds are executed outside the State of California, all copies of the bonds must be countersigned by a California representative of the surety. The signature of the person executing the bond shall be acknowledged by a notary public as a signature of the person designated in the power of attorney.

6.2.4 If, during the continuance of the Contract, any of the sureties, in the opinion the City, are or become non-responsible or otherwise unacceptable to City, City may require other ne w or additional sureties which Design- Builder will furnish to the satisfaction of City within ten (10) days after written notice, and in default thereof, the Contract may be suspended and the work completed as provided in Article 15 of the General Conditions.

6.2.5 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, Design-Builder shall promptly furnish a copy of the b onds or shall permit a copy to be made.

6.2.6 In the event of increases in the Contract Price by change orders or otherwise aggregating to ten percent (10%) of the Contract Price or more, and by all such subsequent increases in the Contract Price thereafter, the Design-Builder shall submit to City evidence of additional bond coverage for such increases in the Contract Price.

Design-Builder shall be compensated for such additional bond coverage.

ARTICLE VII

MISCELLANEOUS PROVISIONS

7.1 Independent Contractor
Design-Builder is, and shall be, acting at all times in the performance of this Agreement as an independent contractor.

This Agreement is not intended, and shall not be construed, to create the relationship of agent, servant employee, partnership, joint venture or association as between Design -Builder and City . Design-Builder shall secure at its expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other pay roll deductions for Design-Builder and its officers, agents and employees and all business licenses, if any, in connection with the services to be performed hereunder.

7.2 City Employees and Officials
Design-Builder shall employ no City official nor any regular City employee in the Work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement in violation of applicable provisions of law.

7.3 Notices
All notices, demands or other communications required or permitted to be given under this Agreement shall be in writing and shall be deemed to have been duly delivered: (a) upon personal delivery; (b) as of the third working day after mailing by United States mail, certified-return receipt requested, postage prepaid, addressed to the proper party at the appropriate address set forth below; (c) on the working day immediately after the date it is deposited with and accepted by an overnight courier service, addressed to the proper party at the appropriate address set forth below and marked for the next working day morning delivery; and (d) upon facsimile communication or other electronic communication (such as email or cooperative computer software) approved by City followed by a hard copy with receipt confirmed by telephone or by email. Notice sent by facsimile or other electronic communication after 4:00 p.m. Pacific Standard or

DESIGN-BUILD AGREEMENT
Page A-10
Daylight Time (as applicable) shall be deemed received on the next working day following delivery. For purposes of this Agreement, a “working day” means any day Monday through Friday that is not a holiday recognized by the federal government or the State of California.

All notice correspondence between City and Design-Builder shall be sent to the individuals noted below (or as otherwise directed in writing) at the following addresses:

TO CITY:

City Clerk
City of Anaheim
200 S. Anaheim Blvd.

Anaheim, CA 92805

w/copies to:

TO DESIGN-BUILDER:

Liftech Elevator Services, LLC
Attention: Ryan Haines
2897 Gardena Avenue
Signal Hill, California 90755
Phone: (562) 997-3639

Public Works
City of Anaheim
Attention: Fleet and Facilities
955 South Melrose Avenue
Anaheim, California 92805

7.4 Contractor’s License Notice
Contractors are required by law to be licensed and regulated by the Contractors' State License Board, which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four years of the date of the alleged violation. A complaint regarding a n act or omission pertaining to latent defects must be filed within 10 years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors' State License Board, P.O. Box 26000, Sacramento, California 95826.

7.5 Taxes and Reporting

7.5.1 Project Construction - Design-Builder shall cooperate with City in all matters relating to taxation and the collection of taxes, particularly with respect to the self -accrual of use tax. Prior to commencement of construction of the Work, Design -Builder shall obtain a Board Equalization sales and use tax sub -permit for the Site and allocate eligible sales and use tax payments for individual contracts over $5,000,000 to the City. Design -Builder will follow the guidelines set forth in the relevant sections of the Sales and Use Tax Regulations. The Design -Builder must, on its quarterly use tax return, identify the use tax applicable to the Sites and use the appropriate Board of Equalization forms and schedules to ensure that the tax is allocated to the Sites. In determining the amounts of use tax to be paid, the Design-Builder must follow the Sale and Use Tax Regulations. In the event it is later determined that certain eligible use tax amounts were not included on Design-Builder's use tax return(s), Design-Builder must agree to amend those returns and file them with the Board of Equalization in a manner that will ensure that the City receives such additional use tax from the Project.

DESIGN-BUILD AGREEMENT
Page A-11

7.5.2 Use Tax Direct Payment Process - Design-Builder shall follow the Use Tax Direct Payment Permit Process established in the Revenue and Taxation Code and use the sub-permit for all qualifying individual purchases in excess of $100,000 so that the local share of its sales/use tax payments is allocated to the City as the point of sale.

7.5.3 Fixtures, Materials and Equipment - It is understood and agreed that any fixtures, materials and equipment shipped from outside California, with a purchase total that exceeds $100,000 purchased directly by Design- Builder and shipped to Design-Builder's Anaheim location, may also be eligible for direct allocation of sales/use tax to the City. Design -Builder shall complete and submit to the City the Use Tax Direct Payment Permit. Upon request, Design-Builder shall provide to City on a semi-annual basis with a list of purchases exceeding the $100,000 threshold during the preceding six-month period, including the amount of the purchase and, if readily available, the name and contact information for the vendor upon request by the City. The City agrees to review the semi -annual list of purchases made by Design-Builder.

7.5.4 Permits - Copies of the permit(s) shall be delivered to the City Engineer. In completing the permit, Design-Builder shall use the address of the Site as its business address and may use any address for its mailing address. Copies of the permit(s) shall also be delivered to the City Engineer. The Design -Builder shall provide documentation to the City that the sub -permit(s) have been obtained and provide the sub- permit number(s) to City.

The permit(s) must be obtained as soon as reasonably possible after Desi gn-Builder receives a Notice to Proceed.

Design-Builder shall not order any materials or equipment of $100,000 from vendors outside California until the permit(s) are obtained; and if Design-Builder do so, it shall be a material breach of this Agreement.

7.6 Department of Industrial Relations Registration
Strict compliance with all Department of Industrial Relations (“DIR”) registration requirements in accordance with Labor Code §§ 1725.5 and 1771.1 is a material obligation of Design -Builder and all of its Subcontractors (of any tier) under the Contract Documents. The foregoing includes, without limitation, compliance with DIR registration requirements at all times during performance of the Work by Design -Builder and all of its S ubcontractors of any tier. Design -Builder shall execute Exhibit H which is a certification that Design -Builder is in compliance with the DIR registr ation requirements. In addition, Design -Builder shall provide certification of registration and registration number to City before a Subcontractor will be allowed to work on the Project. The failure of Design-Builder and its Subcontractors of any tier to be properly registered with DIR at all times during performance of the Work is a material breach of the Contract and grounds for termination for cause. An affirmative and ongoing obligation of Design -Builder under the Contract Documents is the verification that all S ubcontractors of any tier are at all times during performance of the Work in full and strict compliance with the DIR registration requirements. Design-Builder shall not permit or allow any Subcontractor of any tier to perform any Work without Design -Builder’s verification that all S ubcontractors are in full and strict compliance with the DIR registration requirements. Any Subcontractor not properly registered with DIR shall be substituted in accordance with Labor Code § 1771.1. Design-Builder or its Subcontractors shall not be entitled to any additional costs or time arising from or in any way related to compliance with the DIR registration requirements.

7.7 Community Workforce Agreement
Design-Builder agrees to comply with the Second Amended and Restated Community Workforce Agreement dated September 24, 2024 (“CWA”) if the Project includes covered “Project Work” as defined in the CWA. (Exhibit J) If there is conflict between this Agreement and the CWA, Design-Builder agrees to comply with the terms of the CWA. Design- Builder shall require each of its Subcontractors, of whatever tier, to be bound by the terms of the CWA.

7.8 Equal Employment Opportunity
During performance of the Contract, Deign -Builder will not discriminate against any person or group of persons on account of race, color, religion, creed, national origin, ancestry, physical handicap, medical condition, age, marital status, sex or sexual o rientation. Design -Builder confirms that it has an equal opportunity policy ensuring equal

DESIGN-BUILD AGREEMENT
Page A-12
employment opportunity without regard to race, color, national origin, sex, age, religion or handicap; and that it maintains no employee facilities segregated on the basis of race, color, religion or national origin.

7.9 Provisions Required by Law
Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Design-Builder shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and the California Public Contract Code where applicable to this Project.

WHEREFORE, this Design-Build Agreement is entered into as of the day and year first written above.

DESIGN-BUILD AGREEMENT
Page A-1

LIFTECH ELEVATOR SERVICES, LLC

By: _________________________________
Name: ____________________
Title: _____________________
Dated: ____________________
California Contractor’s License No.: ____________________ Federal Tax I.D. No.: ____________________
State Tax I.D. No.: ____________________
Anaheim Business License No.: ____________________
Department of Industrial Relations No.: ____________________

CITY OF ANAHEIM
By:

Dated:

ATTEST:

By:________________________________________________
City Clerk
APPROVED AS TO FORM:

ANAHEIM CITY ATTORNEY

By:________________________________________________
Bryn M. Morley
Deputy City Attorney
158250
NOTE: Signatures of corporate officials must be notarized.

.

DESIGN-BUILD AGREEMENT
Exhibit A-1

EXHIBIT A
Site Legal Description

.

DESIGN-BUILD AGREEMENT
Exhibit B-1

EXHIBIT B

SCOPE OF WORK AND INDEX OF

DESIGN DEVELOPMENT DOCUMENTS

SCOPE OF WORK
This exhibit supplements the other Contract Documents in defining the scope of work of the Design-Builder and includes activities, requirements, and design deliverables.

The Work shall include, unless specifically otherwise, all design work, labor, material, tools, equipment, excavation, shoring, testing, inspection, commissioning, and all necessary general conditions that may be reasonably inferred from the Contract Documents to provide all design Work and Construction Work for the Project.

Refer to the Request for Proposals (RFP) including Exhibits to this agreement but not limited to the Technical Requirements for project-specific work scope.

INDEX OF DESIGN DEVELOPMENT DOCUMENTS

Design Development Documents shall include, but are not limited to those defined in the General Conditions and:

1. Drawings

2. Specifications

3. Calculations/Reports

4. Cut Sheets

Design-Builder shall incorporate into the Design Development civil, landscape architectural, architectural, structural, mechanical, plumbing, and electrical systems, or other specialty trades, materials, products, equipment, and such other elements and other systems consistent with and as described in the RFP Documents.

.

DESIGN-BUILD AGREEMENT
Exhibit C-1

EXHIBIT C

APPROVED DEVIATIONS

.

DESIGN-BUILD AGREEMENT
Exhibit D-1

EXHIBIT D

DESIGN-BUILDER'S KEY PERSONNEL LIST
The attached Organizational/Key Personnel Chart includes identification and responsivities of key personnel

.

DESIGN-BUILD AGREEMENT
Exhibit E-1

EXHIBIT E

PROJECT SCHEDULE

The attached Design -Builder’s Design and Construction Schedule submitted with the Technical Proposal, is preliminary only, and ref lects project completion within 450 calendar days.

This schedule reflects major design and construction activities, including but not limited to a specific emphasis on procuring materials including long- lead items; and the Design- Builders approach to obtaining the required permit and approvals necessary to complete the design and construction. The schedule identifies Significant contract activities including City reviews, procurement activities and durations, including the activities required to complete the Construction Documents and obtain required approvals.

Design-Builder will submit to City for review and acceptance an updated and detailed CPM Project Schedule including each deadline specified in the Contract Documents; i) Schedule of Submittals; ii) material procurement schedule; and iii) a Schedule of Values in accordance with the requirements of the General Conditions and other Contract Documents.

DESIGN-BUILD AGREEMENT
Exhibit F-1

EXHIBIT F
Performance Bond No. __________

PERFORMANCE BOND

WHEREAS, the City of Anaheim ("City") has awarded LIFTECH ELEVATOR SERVICES, LLC designated as the "Principal" or “Design-Builder” herein, a contract for the work described as follows: Anaheim West Tower Elevator Modernization Project and related construction activities associated therewith; and WHEREAS, on or about ___________2026 , the Principal entered into a Contract with the City for the design and construction of the work of improvement, which Contract and all Contract Documents set forth therein are incorporated herein and made a part hereof by this reference; and
WHEREAS, Principal is required to furnish a bond guaranteeing the faithful performance of its obligations under the Contract Documents concurrently with delivery to City of the executed Contract.

NOW, THEREFORE, Principal and _____________________ ("Surety"), a duly admitted surety in the State of California, are held and firmly bound to City for payment of the penal sum of $ 3,445,337.50 ("the Bonded Sum"), in lawful money of the United States, for payment of which sum Principal and Surety jointly and severally bind themselves and their heirs, executors, administrators, successors and assigns.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT if Principal shall promptly and faithfully perform all of its obligations under the Contract Documents, including any and all amendments and supplements thereto, then this obligation shall be null and void; otherwise it shall remain in full force and effect.

The following terms and conditions shall apply with respect to this Bond:

1. The Design-Builder and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to City for the complete and proper performance of the Contract, which is incorporated herein by reference.

2. If the Design-Builder completely and properly performs all of its obligations under the Contract, the Surety and the Design-Builder shall have no obligation under this Bond.

3. If there is no City Default, the Surety's obligation under this Bond shall arise after:

3.1 City has declared a Design-Builder Default under the Contract pursuant to the terms of the Contract; and

3.2 City has agreed to pay the Balance of the Contract Price to:

3.2.1 The Surety in accordance with the terms of this Bond and the Contract; or

DESIGN-BUILD AGREEMENT
Exhibit F-2

3.2.2 The contractor selected to perform the Contract in accordance with the terms of this Bond and the Contract.

4. When City has satisfied the conditions of Paragraph 3, the Surety shall promptly (within thirty (30) days) and at the Surety's expense elect to take one of the following actions (provided, that unless and until City has actually terminated Design-Builder for default, the Surety need only respond to City and commence a diligent investigation, not make an election):

4.1 Arrange for the Design-Builder, with consent of City, to perform and complete the Contract (but City may withhold consent, in its sole discretion, in which case the Surety must elect an option described in Paragraphs 4.2, 4.3 or 4.4, below); or

4.2 Undertake to perform and complete the Contract itself, through its agents or through independent contractors, but City may reject use of the contractor as an agent or independent contractor; or

4.3 Obtain bids from qualified contractors acceptable to City for a contract for performance and completion of the Contract (other than the original Design-Builder), and, upon determination by City of the lowest responsible bidder, arrange for a contract to be prepared for execution by City and the contractor selected with City 's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Contract; and, if the Surety's obligations defined in Paragraph 6, below, exceed the Balance of the Contract Price, then the Surety shall pay to City the amount of such excess; or

4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances, and, after investigation and consultation with City, determine in good faith its monetary obligation for which it may then be liable to City under Paragraph 6, below, for the performance and completion of the Contract and, as soon as practicable after the amount is determined, tender payment therefor to City with full explanation of the payment's calculation. If City accepts the Surety's tender under this Paragraph 4.4, City may still hold Surety liable for future damages then unknown or unliquidated resulting from the Design-Builder Default. If City disputes the amount of Surety's tender under this Paragraph 4.4, City may exercise all remedies available to it at law to enforce the Surety's liability under Paragraph 6 below.

5. If the Surety does not proceed as provided in Paragraph 4, above, then the Surety shall be deemed to be in default on this Bond ten (10) calendar days after receipt of an additional written notice from City to the Surety demanding that the Surety perform its obligations under this Bond. At all times City shall be entitled to enforce any remedy available to City at law or under the Contract including, without limitation, and by way of example only, rights to perform work, protect work, mitigate damages, or coordinate work with other consultants or contractors.

6. The Surety's monetary obligation under this Bond is limited to the amount of this Bond, plus the Balance of the Contract Price paid hereunder. Subject to these limits, the Surety's obligations under this Bond are commensurate with the obligations of the Design -Builder under the Contract. The Surety's obligations shall include, but are not limited to:

6.1 The responsibilities of the Design -Builder under the Contract for completion of the Contract and correction of defective work;

6.2 The responsibilities of the Design -Builder under the Contract to pay liquidated damages, and for damages for which no liquidated damages are specified in the Contract, actual damages caused by

DESIGN-BUILD AGREEMENT
Exhibit F-3

non-performance of the Contract, including but not limited to, all valid and proper back charges, offsets, payments, indemnities, or other damages;

6.3 Additional legal, design professional and delay costs resulting from the Design -Builder Default or resulting from the actions or failure to act of the Surety under Paragraph 4, above.

7. No right of action shall accrue on this Bond to any person or entity other than City or its heirs, executors, administrators, or successors.

8. The Surety hereby waives notice of any change, alteration or addition to the Contract or to related subcontracts, purchase orders and other obligations, including changes of time. The Surety consents to all terms of the Contract, including provisions on c hanges to the Contract. No extension of time, change, alteration, modification, deletion, or addition to the Contract Documents, or of the work required thereunder, shall release or exonerate Surety on this Bond or in any way affect the obligations of Surety on this Bond.

9. Any proceeding, legal or equitable, under this Bond shall be instituted in any court of competent jurisdiction where a proceeding is pending between City and the Design-Builder regarding the Contract, or in the courts of the City of Anaheim, or in a court of competent jurisdiction in the location in which the work is located.

10. Notice to the Surety, City or the Design -Builder shall be mailed or delivered to the address shown on the signature page.

11. Any provision in this Bond conflicting with any statutory or regulatory requirement shall be deemed deleted here from and provisions conforming to such statutory requirement shall be deemed incorporated herein.

12. Definitions.

12.1 Balance of the Contract Price: The total amount payable by City to the Design-Builder pursuant to the terms of the Contract after all proper adjustments have been made under the Contract, for example, deductions for progress payments made, and increases/decreases for approved modifications to the Contract.

12.2 Contract: The agreement between City and the Design -Builder identified on the signature page, including all Contract Documents and changes thereto.

12.3 Design-Builder Default: Material failure of the Design-Builder, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Contract.

12.4 City Default: Material failure of City, which has neither been remedied nor waived, to pay the Design- Builder progress payments due under the Contract or to perform other material terms of the Contract, if such failure is the cause of the asserted Design -Builder Default and is sufficient to justify Design- Builder termination of the Contract.

13. Qualification Regarding Extended Warranties. The Surety’s liability for extended warranties for Subcontractors and suppliers shall not apply to a breach of any such extended warranty under the Contract that occurs more than one year after the applicable warranty commencement date under the Contract.

IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety of the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant

DESIGN-BUILD AGREEMENT
Exhibit F-4

to authority of its governing body. Principal and Surety have caused this Bond to be duly executed and delivered as of this day of , 2026.

SURETY:

PRINCIPAL:

LIFTECH ELEVATOR SERVICES, LLC,
Name

Name

Principal Place of Business Address
By:_____________________________________
Signature

_______________________________________
Attorney-In-Fact
By:____________________________________
Signature

______________________________________
Printed Name

______________________________________
Title

DESIGN-BUILD AGREEMENT
Exhibit F-5

NOTARIAL CERTIFICATION OF ATTORNEY IN FACT, CORPORATION SEAL

AND SURETY SEAL MUST BE ATTACHED

ACKNOWLEDGMENT OF PERFORMANCE BOND

State of California
City of ____________________)
On _____________________________ before me, ____________________ personally appeared_______________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they/ executed the same in his/her/their authorized capacity(ies) and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________________ (Seal)

A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

DESIGN-BUILD AGREEMENT
Exhibit F-6

ACKNOWLEDGMENT OF ATTORNEY IN FACT

PERFORMANCE BOND

State of California
City of _____________________________)
On _________________________ before me, _________________________ personally appeared ___________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they/ executed the same in his/her/their authorized capacity(ies) and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________________ (Seal)

A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

DESIGN-BUILD AGREEMENT
Exhibit G-1

EXHIBIT G
Payment Bond No. ________

PAYMENT BOND
(Labor and Material Bond)

WHEREAS, the City of Anaheim ("City") has awarded LIFTECH ELEVATOR SERVICES, LLC designated as the "Principal" or “Design-Builder” herein, a contract for the work described as follows: Anaheim West Tower Elevator Modernization Project and related construction activities associated therewith; and WHEREAS, on o r about ________________ , the Principal entered into a Contract with the City for the design and construction of the work of improvement, which Contract and all Contract Documents set forth therein are incorporated herein and made a part hereof by this reference; and
WHEREAS, by terms of the Contract, as well as California Civil Code § 9550 et seq. and Public Contract Code § 22165(a), Principal is required to furnish a bond guaranteeing payment of claims.

NOW, THEREFORE, Principal and ______________ ("Surety"), a duly admitted surety in the State of California, are held and firmly bound to the City for payment of the penal sum of $3,445,337.50 ("the Bonded Sum"), in lawful money of the United States, for payment of which sum Principal and Surety jointly and severally bind the mselves and their heirs, executors, administrators, successors and assigns.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT if Principal shall fail to pay any of the persons named in California Civil Code § 9100 for all labor, materials, equipment or services used or reasonably required for use in performance of the Work of the Project, then Surety shall pay for the same in an amount not -to-exceed the Bonded Sum, otherwise this obligation shall be null and void.

The following terms and conditions shall apply with respect to this Bond:

1. The Design-Builder and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to City and to Claimants, to pay for labor, materials and equipment furnished for use in the performance of the Contract, which is incorporated herein by reference.

2. With respect to City, this obligation shall be null and void if the Design-Builder:

2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and

2.2 Defends, indemnifies and holds harmless City from all claims, demands, liens or suits by any person or entity who furnished labor, materials or equipment for use in the performance of the Contract, provided City has promptly notified the Design -Builder and the Surety (at the address described in Paragraph 10) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Design-Builder and the Surety, and provided there is no City Default.

3. With respect to Claimants, this obligation shall be null and void if the Design-Builder promptly makes payment, directly or indirectly through its subcontractors, for all sums due Claimants. However, if Design-Builder or its subcontractors fail to pay any of the persons named in California Civil Code § 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from

DESIGN-BUILD AGREEMENT
Exhibit G-2

the wages of employees of Design-Builder or subcontractors pursuant to the Unemployment Insurance Code § 13020, with respect to such work and labor, then Surety will pay for the same, and also, in case suit is brought upon this bond, a reasonable attorney's fee, to be fixed by the Court.

4. The Surety shall have no obligation to Claimants under this Bond unless the Claimant has satisfied all applicable notice requirements under Civil Code § 9560.

5. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety under this Bond.

6. Amounts due the Design-Builder under the Contract shall be applied first to satisfy claims, if any, under any Construction Performance Bond and second, to satisfy obligations of the Design-Builder and the Surety under this Bond.

7. City shall not be liable for payment of any costs, expenses, or attorney's fees of any Claimant under this bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond.

8. The Surety hereby waives notice of any change, including changes of time, to the Contract or to related subcontracts, purchase orders and other obligations.

9. Suit against Surety on this Payment Bond may be brought by any Claimant, or its assigns, at any time after the Claimant has furnished the last of the labor or materials, or both, but, pursuant to California Civil Code § 9558, must be commenced before the expiration of six months after the period in which stop payment notices may be filed as provided in Civil Code § 9356.

10. Notice to the Surety, City or the Design -Builder shall be mailed or delivered to the address shown on the signature page. Actual receipt of notice by Surety, City or the Principal , however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page.

11. This Bond has been furnished to comply with Civil Code § 9000 et seq. Any provision in this Bond conflicting with said statutory requirements shall be deemed deleted and provisions conforming to such statutory or other legal requirements shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond.

12. Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Design-Builder shall promptly furnish a copy of this Bond or shall permit a copy to be made.

13. DEFINITIONS

13.1 Claimant: An individual or entity having a direct contract with th e Design-Builder or with a subcontractor of the Design -Builder to furnish labor, materials or equipment for use in the performance of the Contract, as further defined in California Civil Code § 9100. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Contract, architectural and engineering services required for performance of the work of the Design- Builder and the Design-Builder's subcontractors, and all other items for which a stop payment notice might be asserted.

13.2 Contract: The agreement between City and the Design -Builder identified on the signature page, including all Contract Documents and changes thereto.

DESIGN-BUILD AGREEMENT
Exhibit G-3

13.3 City Default: Material failure of City, which has neither been remedied nor waived, to pay the Design- Builder as required by the Contract, provided that failure is the cause of the failure of Design-Builder to pay the Claimants and is sufficient to justify termination of the Contract.

IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety of the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Principal and Surety have caused this Bond to be duly executed and delivered as of this day of , 20___.

SURETY:

PRINCIPAL:

LIFTECH ELEVATOR SERVICES, LLC
Name

Name

Principal Place of Business Address
By:_____________________________________
Signature

_______________________________________
Attorney-In-Fact
By:____________________________________
Signature

______________________________________
Printed Name

______________________________________
Title

DESIGN-BUILD AGREEMENT
Exhibit G-4

NOTARIAL CERTIFICATION OF ATTORNEY IN FACT, CORPORATION SEAL

AND SURETY SEAL MUST BE ATTACHED

ACKNOWLEDGMENT OF PAYMENT BOND

State of California
City of _______________________________)
On ___________________ before me, _______________________personally appeared_____________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they/ executed the same in his/her/their authorized capacity(ies) and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________________ (Seal)

A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

DESIGN-BUILD AGREEMENT
Exhibit G-5

ACKNOWLEDGMENT OF ATTORNEY IN FACT

PAYMENT BOND

State of California
City of ______________________)
On _________________ before me, _______________________personally appeared ______________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they/ executed the same in his/her/their authorized capacity(ies) and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature ______________________________________ (Seal)

A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

DESIGN-BUILD AGREEMENT
Exhibit H-1

EXHIBIT H

CERTIFICATION OF CONTRACTOR AND SUBCONTRACTOR

DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION

Pursuant to Labor Code S ection 1725.5, a contractor or subcontractor must be registered with the Department of Industrial Relations in order to bid on, be listed in a bid proposal, or engage in the performance of any defined public work contract.

I, _______________, ________ certify that ________________ is currently registered with the Department of Industrial Relations (“DIR”):

Contractor’s DIR Registration Number: 1000010759
Expiration Date: 6/30/2026
Contractor further acknowledges that:

Contractor shall maintain DIR registered status for the duration of the Project without lapse in registration.

Contractor shall note in its invitation to bid the DIR’s registration requirement for all subcontractors and their subcontractors.

Contractor shall ensure that all subcontractors are registered at the time of bid opening and maintain registered status for the duration of the Project.

Contractor is to furnish DIR Registration Number for all subcontractors on the project either at the time of bid or within 24 hours of the bid opening.

Contractor shall substitute any subcontractor with a DIR registered subcontractor if listed subcontractor is unable to perform the Work.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Signature

Date

DESIGN-BUILD AGREEMENT
Exhibit I-1

EXHIBIT I

DESIGNATION OF SUBCONTRACTORS
Design-Builder shall set forth below:

1. The name and location of the place of business of each subcontractor who will perform work or labor or render service to the Design -Builder in or about the construction of the work of improvement, or a subcontractor licensed in the State of California who, under subcontract to the Design -Builder, specially fabricates and installs a portion of the work of improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent (0.5%) of the Design-Builder 's total bid.

2. The portion and estimated dollar amount of the work which will be done by each subcontractor. The Design- Builder shall list only one subcontractor for each portion as is defined by the Design-Builder in his/her bid.

3. If the Design -Builder fails to specify a subcontractor, or if the Design -Builder specifies more than one subcontractor for the same portion for work to be performed under the Contract in excess of one -half of one percent of the Design-Builder's total bid, then he/she agrees that he/she is fully qualified to perform that portion himself/herself, and that he/she shall perform that portion himself/herself. If after award of Contract, the Design-Builder subcontracts any such portion of the Work, the Design-Builder shall be subject to the statutory penalties.

4. All subcontractors (of any tier) performing any portion of the work or labor or rendering services to the Design- Builder must comply with Labor Code Sections 1771.1 and 1725.5, must be properly registered with the California Department of Industrial Relations, and must be qualified to perform public works pursuant to Labor Code Section 1725.5 throughout the duration of the Project.

Please type or legibly print (attach additional sheets as necessary).

The attached Designation of Subcontractors lists only those subcontractors that have been identified at the time of proposal submittal to perform work, furnish labor or render services. The Design- Builder is obligated to identify the balance of their Subco ntractors at a later date, subject to its compliance with the Subcontractor selection policy set forth in Article 6 of the General Conditions. All Subcontractors shall be afforded the protections contained in the Subcontracting Act.

DESIGN-BUILD AGREEMENT
Exhibit I-2

Subcontractor Information for City and DIR

Dated: _____________________

1. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

2. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

3. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

4. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

5. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

6. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

DESIGN-BUILD AGREEMENT
Exhibit I-3

7. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

8. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

9. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

10. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

11. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

12. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

DESIGN-BUILD AGREEMENT
Exhibit I-4

13. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

14. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

15. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

16. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

17. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

18. Subcontractor
Name

Item of Work
Complete Street Address
Phone No.

Project Manager
Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date

DESIGN-BUILD AGREEMENT
Exhibit J-1

EXHIBIT J

SECOND AMENDED AND RESTATED

COMMUNITY WORKFORCE AGREEMENT
Ao+ p- - 119 ea. B

SECOND AMENDED AND RESTATED

COMMUNITY WORKFORCE AGREEMENT

BY AND BETWEEN THE

CITY OF ANAHEIM
m

LOS ANGELES/ ORANGE COUNTIES

BUILDING AND CONSTRUCTION TRADES COUNCIL

AND THE SIGNATORY CRAFT COUNCILS AND LOCAL UNIONS

SIGNING THIS AGREEMENT
TABLE OF CONTENTS Page
ARTICLE 1 DEFINITIONS 2
ARTICLE 2 SCOPE OF THE AGREEMENT 3
ARTICLE 3 UNION RECOGNITION AND EMPLOYMENT 7
ARTICLE 4 UNION ACCESS AND STEWARDS 11
ARTICLE 5 WAGES AND BENEFITS 12
ARTICLE 6 HOURS OF WORK, OVERTIME, SHIFTS AND HOLIDAYS 12 ARTICLE 7 WORK STOPPAGES AND LOCKOUTS 14
ARTICLE 8 WORK ASSIGNMENTS AND JURISDICTIONAL DISPUTES 18 ARTICLE 9 MANAGEMENT RIGHTS 19
ARTICLE 10 SETTLEMENT OF GRIEVANCES AND DISPUTES 21
ARTICLE 11 REGULATORY COMPLIANCE 22
ARTICLE 12 SAFETY AND PROTECTION OF PERSON AND PROPERTY 23 ARTICLE 13 TRAVEL AND SUBSISTENCE 23
ARTICLE 14 APPRENTICES 24
ARTICLE 15 WORKING CONDITIONS 25
ARTICLE 16 PRE - JOB CONFERENCES 25
ARTICLE 17 LABOR/ MANAGEMENT COOPERATION 25
ARTICLE 18 SAVINGS AND SEPARABILITY 26
ARTICLE 19 WAIVER 26
ARTICLE 20 AMENDMENTS 27
ARTICLE 21 DURATION OF THE AGREEMENT 27
ATTACHMENT A — LETTER OF ASSENT 29
ATTACHMENT B — ORANGE COUNTY ZIP CODES 30
ATTACHMENT C — CRAFT REQUEST FORM 32
ATTACHMENT D — LIST OF NEUTRAL ARBITRATORS 34
ATTACHMENT E — SUBSTANCE ABUSE POLICY 35
Community Workforce Agreement 2 City of Anaheim

COMMUNITY WORKFORCE AGREEMENT
This Second Amended Restated Community Workforce Agreement (" Agreement") is entered into on , 2024 (" Effective Date"), by and between the City of Anaheim, a municipal corporation and charter city (" City"), the Los Angeles/ Orange Counties Building and Construction Trades Council (" Trades Council"), and the signatory Craft Councils and Local Unions signing this Agreement ( collectively, the " Union" or " Unions"). This Agreement establishes the proceduresfor the City, Contractors, andcraft employeesrepresentedby the Unions andengaged in Project Work. The City, Trades Council, and Unions are hereinafter referred to herein, as the context may require, as "Party" or " Parties."
It is understood by the Parties to this Agreement that for the duration of this Agreement, the City agrees that all Project Work ( as defined in Section 2. 2.) will be contracted exclusively to Contractors who agree to execute and be bound by the terms of this Agreement by signing a Letter of Assent ( a form of which is attached as " Attachment A"), and to require each of its subcontractors, of whatever tier, to become so bound. The City shall include, directly or by incorporation by reference, the requirements of this Agreement in the advertisement of and/or specifications for those Project Work contracts to be awarded by the City.

It is further understood that the City shall actively administer and facilitate the enforcement of the obligations of this Agreement to ensure that the benefits envisioned from it flow to all Parties. The City shall therefore designate a "CWA Administrator," either from its own staff or an independent contractor, to serve as the City' s liaison for Contractors and Unions; to monitor compliance with this Agreement; to assist, as the authorized representative of the City, in developing and implementing the programs referenced herein, all of which are critical to fulfilling the intent and purposes of the Parties and this Agreement; and to otherwise implement and administer this Agreement.

RECITALS
WHEREAS, the City desiresto obtain construction, maintenance, repair, abandonment, relocation, and related services in connection with public contracting of its Capital Improvement Program CIP); and
WHEREAS, the public interest, local economy, and general welfare are best served if the CIP activities are implemented without disruption due to labor disputes; and WHEREAS, Construction Contracts entered into by the City and Contractors will be awarded in accordance with applicable provisions of the Charter of the City of Anaheim to the lowest responsive and responsible bidder subject to a competitive bidding process, the California Public Contract Code and Labor Code, including but not limited to payment of prevailing wages; and WHEREAS, the City Council directed City staff at its meeting of March 19, 2019, to develop a Community Workforce Agreement with the Trades Council that includes the benefits of hiring local residentsandotherpriority groupsto perform suchcapital improvements.

WHEREAS, in order to resolve litigation filed in the Orange County Superior Court, the Parties have agreed to amend and restate the Community Workforce Agreement by modifying section

3. 8. 2.

NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL PROMISES, COVENANTS AND CONDITIONS HEREIN CONTAINED, THE PARTIES AGREE AS FOLLOWS:

ARTICLE 1

DEFINITIONS
Section 1. 1 " Agreement" or " CWA" means this Second Amended and Restated Community Workforce Agreement.

Section 1. 2 " Apprentice" means those craft employees indentured and participating in a Joint Labor/ Management Apprenticeship Program approved by the State of California, Department of Industrial Relations, Division of Apprenticeship Standards.

Section 1. 3 " Construction Contract" or " Construction Contracts" means those contracts entered into by the City, for the construction of Project Work as specified in Section 2.2.

Section 1. 4 " Contractor" means any individual firm, partnership, or corporation, or combination thereof, including joint ventures, which is an independent business enterprise and which has entered into a Construction Contract with the City including any Subcontractors of any tier, with respect to Project Work under this Agreement.

Section 1. 4. 1 " General Construction Contractor" or " GCC" means a prime Contractor retained directly by the City to perform Project Work and has entered into a Construction Contract.

Section 1. 4. 2 " Subcontractor" means a Contractor who is retained by a GCC, or another lower tier Contractor, to perform Project Work.

Section 1. 5 " City" means the City of Anaheim, a municipal corporation.

Section 1.6 " Joint Labor/ Management Apprenticeship Program" means a joint Union and Contractor administered apprenticeship program certified by the State of California, Department of Industrial Relations, Division of Apprenticeship Standards.

Section 1. 7 " Letter of Assent" means the document that each Contractor ( of any tier) must sign and submit to the City before beginning any Project Work, which formally binds such Contractor( s) to adherence to all the forms, requirements, and conditions of this Agreement in the form attached hereto as Attachment A.

Section 1. 8 " CWA Administrator" means the City' s authorized representative who will be the primary liaison between the City, Contractors, and the Unions; responds to inquiries about the Community Workforce Agreement 2 City of Anaheim
CWA; monitors compliance with the CWA, and develops and implements programs set forth in the CWA.

Section 1. 9 " Project", " Project Work" or " City Project" means Capital Improvement Program projectsadministeredthrough the City of AnaheimPublic Works Department, subjectto the State of California public contracting laws, authorizedby the City Council pursuantto a Construction Contract entered into by the City, and as further described in Section 2.2.

Section 1. 10 " Specialty Contracts" means a contract for Project Work with a specialty contractor which is eitherlimited to a particular singletradeor craft or limited to a singular scopeof work.

Section 1. 11 " Master Labor Agreements" means the local collective bargaining agreements of the signatoryUnions having geographicandtradejurisdiction over the Project Work and which have signed this Agreement.

Section 1. 12 " Subscription Agreement" means the contract between a Contractor and a Union' s Labor/ Management Trust Fund( s) that allows the Contractor to make the appropriate fringe benefit contributions in accordance with the terms of the Master Labor Agreements.

Section 1. 13 " Local Hires" means individuals identified in Section 3.5, who are employed by Contractorsascraft employeesto perform Project Work and havepriority in being dispatchedby the respective Unions.

Section 1. 14 The use of masculine or feminine gender or titles in this Agreement should be construedas including both gendersand not as genderlimitations unlessthe Agreementclearly requires a different construction. Further, the use of Article titles and/ or Section headings are for information only and carry no legal significance.

ARTICLE 2

SCOPE OF THE AGREEMENT
Section 2. 1 General This Agreement shall apply to all of the City' s Project Work, as defined in Section 2.2, performed by those Contractor( s) of whatever tier that have contracts awarded for such work, for the development of the City' s facilities which, jointly, constitute the Project, and have been designated by the City for construction or planned rehabilitation. The CWA administrator will submit annual reports to the City Council on this agreement.

Section 2. 2 Specific Project Work covered by this Agreement is defined and limited to:

2. 2. 1 All City Project Work - prime multi -trade constructioncontractsthat exceedfive hundred thousand dollars ($ 500,000) and all subcontracts flowing from these prime multi -trade contracts.

2. 2. 2 All prime " Specialty Contracts," as defined in Section 1. 10 that exceed two hundred thousand dollars ($ 200,000) and all subcontracts flowing from these specialty contracts.

Community Workforce Agreement 3 City of Anaheim

2. 2. 3 The City may, at any time and at its sole discretion, determine to build additional buildings, facilities, andother projects underthis Agreementwhich arenot otherwisecoveredas Project Work.

2. 2. 4 This Agreement is not intended to, and shall not apply to any work advertised for bids or performedat anytime prior to the Effective Date, or after the expiration or termination of this Agreement, except as otherwise provided herein. This Agreement shall in no way limit the City' s right to terminate, modify or rescind any construction contract and/or any related subcontract or agreement. Should the City remove or terminate any contract or agreement for construction that does not fall within the scope of this Agreement and thereafter authorize that work be commenced on any contract for such construction, the contract for construction shall be performedunderthetermsof this Agreementif thework is not excludedper Section2.5.

Section 2. 3 Bundling of Contracts

2. 3. 1 The City, in its sole discretion, may seek to group ( or " bundle") for bidding, contracts not meeting the threshold of Section 2.2 above. ( Small contracts for like types of work, scheduled to be undertaken at the same facility or on the same project site, and within the same timeframe, will be considered for such bundling, consistent with economies of scale, and the purposes of this Agreement); and

2. 3. 2 Project Work will not be intentionally split, divided, or otherwise separated for contract award purposes to avoid application of this Agreement.

Section 2. 4 Applicability This Agreement shall not apply to any work of any Contractor other than that on Project Work specifically covered by this Agreement.

Section 2. 5 Exclusions Items specifically excluded from the scope of this Agreement include the following:

2. 5. 1 Work of non -manual employees, including but not limited to: superintendents; supervisors ( except those covered by Master Labor Agreements above the level of general foreman); staff engineers; time keepers; clerks; office workers; messengers; guards; safety personnel; emergencymedical and first aid technicians; and other professional, engineering, executive, administrative, supervisory and management employees;

2. 5. 2 Equipment and machinery owned, controlled, and operated by the City;

2. 5. 3 All off -site manufacture and handling of materials, equipment or machinery; provided, however, the movementof materialsor goodsbetweena Project site and lay down or storage areas for equipment and materials dedicated solely to the Project are within the scope of this Agreement;

2. 5. 4 All work performed by City employees, the CWA Administrator, design teams including, but not limited to, architects engineers and master planners), or any other consultants for the City ( including, but not limited to, project managers and construction managers and their Community Workforce Agreement 4 City of Anaheim
employees where not engaged in Project Work) and their sub - consultants, and other employees of professional service organizations, not performing manual labor within the scope of this Agreement; provided, however, that it is understood and agreed that Surveyors and Building/ Construction Inspector and Field Soils and Materials Testers (Inspectors) are a covered craft under the Agreement. This inclusion applies to the scope of work defined in the State of California Wage Determination for said Craft. This shall also specifically include such work where it is referred to by utilization of such terms as " quality control" or " quality assurance." Every Surveyor and Inspector performing under the wage classifications of Surveyor and Building/ Construction Inspector and Field Soils and Material Testers under aprofessional services agreement or a construction contract shall be bound to all applicable requirements of the CWA.

Covered Work as defined by this Agreement shall be performed pursuant to the terms and conditions of this Agreement regardless of the manner in which the work was awarded;

2. 5. 5 Any work performed near, or leading to a site of Project Work covered by this Agreement and undertaken by Federal, State, county or other governmental bodies, or their Contractors; or by public utilities, or their Contractors; and/or by adjacent third -party landowners; and/or by the City or its Contractors ( for work which is not within the scope of this Agreement);

2. 5. 6 Off - site maintenance of leased equipment and on - site supervision of such work;

2. 5. 7 It is recognized that certain equipment and systems of a highly technical and specialized nature will have to be installed at the Project. The nature of the equipment and systems, togetherwith requirementsof a manufacturer'swarranty, may dictatethat it beprefabricated, pre - piped, and/or pre -wired andthat it beinstalled underthe supervisionanddirection of theOwner's and/or manufacturer' s personnel. The Unions agree to install such material, equipment and systems without incident, or allow such installation to be performed by the manufacturer' s employees or a contractor certified by the manufacturer where the Unions are unable to perform such work or the warranty requires the work to be performed by the employees of the manufacturer or a contractor certified by the manufacturer. If a warranty on the manufacturer' s specialty or technical equipment or systems purchased by the Owner requires that the installation of such specialty or technical equipment or system be performed by the manufacturer' s own personnel, then such installation may be performed by the manufacturer' s own personnel. If a warranty on the manufacturer' s specialty or technical equipment or systems purchased by the Owner requires that the installation of such specialty or technical equipment or system be performed by a contractor certified by the manufacturer, and there are no Union signatory contractors certified by the manufacturerto install and/or perform suchwork, then suchinstallation may beperformedby such certified contractor. The General Contractor shall notify the Unions at the prejob conference of the use of this provision and shall provide copies of the written warranty that require that the work be performed by the manufacturer' s own personnel, or a contractor certified by the manufacturer, to the affected Union( s). When the warranty does not require installation by the manufacturer' s own personnel or a contractor certified by the manufacturer, the Unions agree to perform and install such work under the supervision and direction of the manufacturer' s representative. This shall not apply to construction equipment If there is any dispute between the manufacturer and the Union on any work that will affect the warranties or guarantees due to the City, the City will make the final determination asto who will perform the work; Community Workforce Agreement 5 City of Anaheim

2. 5. 8 Non -construction support services contracted by the City or City consultants in connection with a Project;

2. 5. 9 Off -site laboratory work for testing.

2. 5. 10 CoveraLe Exception This Agreement shall not apply if the City receives or is reasonablyanticipatedto receive funding or assistancefrom any Federal, State, local or other public entity for the Project if a requirement, condition or otherterm of receiving that funding or assistanceis that the City not requirebidders, contractors, or otherpersonsor entitiesto enterinto an agreement with one or more labor organizations. This provision shall not apply to Projects awardedprior to the City' s applicationand/or receipt of suchfunding or assistance, solong asthis Agreement does not jeopardize such funding or assistance.

2.5.11 Electrical utility and water utility work on high voltage utility equipment, water well construction, Supervisory Control and Data Acquisition ( SCADA) or other computerized equipment, and other specialty utility construction work not covered by the MLAs of the Unions.

Section 2. 6 Awarding of Contracts for Project Work

2. 6. 1 The City and/or the Contractors, as appropriate, havethe absoluteright to award contracts or subcontracts on Project Work to any Contractor notwithstanding the existence or non- existenceof any agreementsbetweensuchContractor and any Union parties, provided only that suchContractoris ready, willing, andableto executeandcomplywith this Agreementshouldsuch Contractor be awarded Project Work covered by this Agreement.

2. 6. 2 It is agreed that all GCCs that have been awarded Construction Contracts, shall be required to accept and be bound to the terms and conditions of this Agreement, and shall evidence their acceptance by the execution of the Letter of Assent set forth in " Attachment A" hereto, prior to the commencement of any Project Work. At the time that any GCC enters into a subcontract with any Subcontractorof any tier providing for the performanceof ProjectWork, the GCC shall provide a copy of this Agreementto said Subcontractorand shall requirethe Subcontractor, asa part of acceptingthe awardfrom the GCC, to agreein writing in the form of a Letter of Assentto be bound by each and every provision of this Agreement prior to the commencement of Project Work. No GCC or Subcontractor shall commence Project Work without having first provided a copyof theLetter of Assentasexecutedby it to the CWA Administrator andto theTradesCouncil before the commencement of Project Work.

Section 2. 7 Master Labor Agreements

2. 7. 1 Theprovisionsof this Agreement, including theMasterLabor Agreementsassuch maybechangedfrom time -to -time andwhich alsoareincorporatedhereinby reference, shallapply to all Contractorsperforming Project Work. This Agreement is not intendedto supersedesuch Master Labor Agreementsbetweenany of the Contractorsperforming constructionwork on the Project and a Union signatory thereto except to the extent the provisions of this Agreement are inconsistent with such Master Labor Agreements, in which event the provisions of this Agreement shall apply. However, suchdoesnot apply to work performedundertheNational Cooling Tower Community Workforce Agreement 6 City of Anaheim
Agreement, the National Stack Agreement, the National Transit Division Agreement ( NTD), work within the jurisdiction of the International Union of Elevator Constructors, and all instrument calibration and loop checkingwork performed under the terms of the UA/IBEW Joint National Agreement for Instrument and Control Systems Technicians except that Article 7 - Work Stoppages and Lock - Outs, Article 8 - Work Assignments and Jurisdictional Disputes, and Article 10 - Settlement of Grievances and Disputes shall apply to such work. Where a subject is covered by the provisions of a Master Labor Agreement and not in conflict with the provisions of this Agreement, the provisions of the Master Labor Agreementshall apply. It is specifically agreed that no later third party agreement shall be deemed to have precedence over this Agreement unless signed by all party' s signatory hereto who are then currently employed or represented at the Project. Any dispute as to the applicable source between this Agreement and any Master Labor Agreements for determining the wages, hours of working conditions of employees on a Project shall be resolved under the procedures established in Article 10.

2. 7. 2 It is understood that this Agreement, together with the referenced Master Labor Agreements, constitutes a self-contained, stand-alone agreement and by virtue of having become bound to this Agreement, the Contractor will not be obligated to sign any other local, area or national collective bargaining agreement as a condition of performing work within the scope of this Agreement ( provided, however, that the Contractor may be required to sign a uniformly applied, non- discriminatory Subscription Agreement at the request of the trustees or administrator of a trust fund establishedpursuantto Section302 of the Labor ManagementRelationsAct, and to which such Contractor is bound to make contributions under this Agreement, provided that such Subscription Agreement does not purport to bind the Contractor beyond the terms and conditions of this Agreement and/or expand its obligation to make contributions pursuant thereto). It shall be the responsibility of each prime Contractor/ GCC to have each of its subcontractors sign the appropriate Subscription Agreement, with the appropriate craft Union prior to the Subcontractor beginning work on Project Work.

Section 2. 8 Binding Signatories Only This Agreement shall only be binding on the signatory Parties hereto, and shall not apply to the parents, affiliates, subsidiaries, or other ventures of any such Party not performing Project Work.

Section 2. 9 Other CitN Work Nothing contained herein shall be interpreted to prohibit, restrict, or interfere with the performance of any other operation, work, or function not covered by this Agreement, which may be performedby City employeesor contractedfor by the City for its own account, on its property or in and around a Project site.

Section 2. 10 Separate Liabilitl It is understood that the liability of the Contractor( s) and the liability of the separate Unions under this Agreement shall be several and not joint. The Unions agreethat this Agreement doesnot have the effect of creating anyjoint employment statusbetween or among the City or CWA Administrator and/or any Contractor.

Section 2. 11 Completed Project Work As areas of Project Work are accepted by the City, this Agreement shall have no further force or effect on such items or areas except where the Contractor is directed by the City or its representatives to engage in repairs, modification, check-out and/or warranties functions required by its contract( s) with the City under the original contract.

Community Workforce Agreement 7 City of Anaheim
ARTICLE 3

UNION RECOGNITION AND CRAFT EMPLOYMENT
Section 3. 1 Recounition The Contractors recognize the Trades Council and the Unions as the sole and exclusive bargaining representative for the craft employees engaged in Project Work.

Contractors further recognize that the Unions shall be the primary source of craft labor employed on the Project Work except as may otherwise be provided for in this Agreement. In the event that a Contractor has its own core workforce, said Contractor shall follow the procedures outlined in Section 3. 8 below.

Section 3. 2 Contractor Selection of Craft Employees The Contractor shall have the right to determine the competency of craft employees, the number of craft employees required, the duties of such craft employees within their craft jurisdiction, and shall have the sole responsibility for selecting craft employees to be laid off, consistentwith Section 3.3 and Section 4.3 of this Agreement. The Contractor shall also have the right to reject any applicant referred by a Union for any reason, subjectto anyreporting pay required by Article 6; provided, however, that suchright is exercised in good faith and not for the purpose of avoiding the Contractor' s commitment to employ qualified craft workers throughtheproceduresidentified in this Agreement.

Section 3. 3 Referral Procedures

3. 3. 1 For signatoryUnions now having ajob referral systemcontainedin aMasterLabor Agreement, the Contractor agreesto comply with such system, and it shall be used exclusively by such Contractor, except as modified by this Agreement. Such job referral system will be operated in a nondiscriminatory manner and in full compliance with Federal, State, and local laws and regulations which require equal employment opportunities and non- discrimination. All of the foregoinghiring procedures, including relatedpracticesaffecting apprenticeship, shallbe operated so asto considerthe goalsof the City to encourageemploymentof Local Hires on Project Work, and to facilitate the ability of all Contractors to meet their employment needs.

3. 3. 2 The local Unions will exert their best efforts to recruit and refer sufficient numbers of skilled craft workers to fulfill the labor requirements of the Contractor, including specific employment obligations to which the Contractor may be legally and/or contractually obligated; and to refer Apprentices as requested to develop a larger, skilled workforce. The Unions will work with their affiliated regional and national unions, and jointly with the CWA Administrator and others designated by the City, to identify and refer competent craft workers as needed for Project Work, and to identify and hire individuals, particularly Local Hires, for entrance into joint labor/managementapprenticeshipprograms, or to participate in other identified programs and proceduresto assist individuals in qualifying and becoming eligible for such apprenticeship programs, all maintainedto increasetheavailablesupply of skilled craft workersfor ProjectWork to be undertaken by the City.

3. 3. 3 The Union shall not knowingly refer a craft employee currently employed by a Contractor on a covered Project to any other Contractor.

Community Workforce Agreement 8 City of Anaheim
Section 3. 4 Non -Discrimination in Referral. Craft Employment. and Construction Contracting The Unions and Contractors agree that they will not discriminate against any craft employee or applicant for employment in hiring and dispatching on the basis of race, color, religion, sex, gender, national origin, age, membership in a labor organization, sexual orientation, political affiliation, marital status or disability.

Section 3. 5 Emplo,, ment of Local Hires

3. 5. 1 The Unions and Contractors agree that, to the extent allowed by law, and as long as they possessthe requisite skills and qualifications, the Unions will exert their bestefforts to refer and/ or recruit sufficient numbers of skilled craft Local Hires to fulfill the requirements of the Contractors. In recognition of the fact that the City and the communities surrounding Project Work will beimpactedby the constructionof theProjectWork, thePartiesagreeto supportthehiring of Local Hires for Project Work as further described in this Section 3. 5.

3. 5. 1. 1 Tier 1:
a) Residents of the City and other Orange County cities or unincorporated County of Orange, as reflected on the list of U. S. Postal Service zip codes attached hereto as Attachment B;
b) Veterans regardless of residency, primarily through, but not limited to, the Helmets to Hardhats program further described in Section 3.7; and

3. 5. 1. 2 Tier 2:
a) Residents of the surrounding cities of Buena Park, Yorba Linda, Placentia, Fullerton, Cypress, Stanton, Garden Grove, and Orange, as reflected in Attachment B; and b) Graduates of high schools located in Anaheim, regardless of residency. c) Individuals who have successfully completed a Building Trades multi -craft core curriculum pre - apprenticeship program (" MC3 Graduates"), regardless of residency.

3. 5. 1. 3 Tier 3:
a) All other residents of Orange County , asreflected in Attachment B; and b) Disadvantaged individuals, regardless of residency within Orange County, that may include, but are not limited to, formerly homeless individuals or referrals from non-profit organizations such as Chrysalis Orange County or The Salvation Army.

3. 5. 2 A goal of 40% of the total work hours shall be performed from Local Hires including 5% from Veterans, Disadvantaged Individuals, and graduates of local high schools as described in Section 3. 5. 1.

Community Workforce Agreement 9 City of Anaheim

3. 5. 3 The Unions agree to support pre -apprentice referral programs in the City or County of Orange. Further, the Unions agree to place on their referral roles or in their apprentice training programs, as appropriate and needed, qualified persons sent to them by designated City organizations or other organizations working with the City to increase construction industry work opportunities for Local Hires. Additionally, Unions agree to collaborate with local non-profit organizations and high schools in Anaheim to inform individuals about career opportunities through apprenticeships and to conduct joint outreach to recent graduates through participation in job fairs or other career events.

Section 3. 6 Reouirements on Contractors To facilitate the dispatch of Local Hires, all Contractors will be required to utilize the Craft Employee Request Form whenever they are requesting the referral of any employee from a Union referral list for Project Work, a sample of which is attached as Attachment C. When Local Hires are requested by Contractors, the Unions will refer such craft workers regardless of their place in the Unions' hiring halls' list and normal referral procedures.

Section 3. 7 Helmets to Hardhats The City, Contractor, and the Unions recognize a desire to facilitate the entry into the building and construction trades of Veterans who are interested in careers in the building and construction industry. The City, Contractor, and Unions agreeto utilize the services of non-profit Veterans support organizations, including but not limited to, the Center for Military Recruitment, Assessment and Veterans Employment ( hereinafter " Center") and the Center' s " Helmets to Hardhats" program to serve as a resource for preliminary orientation, assessmentof construction aptitude, referral to apprenticeship programs or hiring halls, counseling and mentoring, support network, employment opportunities and other needs as identified by the Parties. For purposesof this Agreement, theterm "Eligible Veteran" shallhavethe samemeaning as the term " veteran" as defined under Title 5, Section 2108( 1) of the United States Code as the same may be amended or re -codified from time to time. It shall be the responsibility of each qualified applicant to provide the Unions with proof of their status as an Eligible Veteran.

3. 7. 1 The Unions and Contractors agree to coordinate with non-profit Veteran organizations, including, the Center to create and maintain an integrated database of veterans interested in working on Project Work and the associated apprenticeship and employment opportunities for working on Project Work. To the extent permitted by law, the Unions will give credit to such Veterans for bona fide, provable past experience.

Section 3. 8 Core Emplovees

3. 8. 1 Contractors that not independently signatories to a Master Labor Agreement with the Union( s) that represent the craft employees which the Contractor employs, may hire, asneeded, first, a member of their core workforce, then an employee through a referral from the appropriate Union hiring hall, then a second core employee, then a second employee through the referral system, and so on until a maximum of five ( 5) core employees are employed, thereafter, all additional employees in the affected trade or craft shall be requisitioned from the craft hiring hall in accordance with Section 3. 3. In the laying off of employees, the number of core employees shall not exceed one-half plus one of the work -force for an employer with 10 or fewer employees, assuming the remaining employees are qualified to undertake the work available. As part of this Community Workforce Agreement 10 City of Anaheim
process, and in order to facilitate the contract administration procedures, as well as appropriate fringe benefit fund coverage, all Contractors shall require their core employees and any other persons employed other than through the referral process, to register with the appropriate Union hiring hall, if any, prior to their first day of employment at a Project site.

3. 8. 2 The core work force is comprised of those craft employees whose names appeared on the Contractor' s active payroll for sixty ( 60) of the one hundred ( 100) working days immediately before award of Project Work to the Contractor; who have worked at least two - thousand (2,000) hours in the construction craft in which they are employed, during the prior four 4) years; who possess any license required by State or Federal law for the Project Work to be performed; and who have the ability to safely perform the basic functions of the applicable trade.

3. 8. 3 Prior to each Contractor performing any work on the Project, each Contractor shall provide a list of his core employees to the CWA Administrator and the Trades Council. Failure to do so will prohibit the Contractor from using any core employees. Upon request by any Party to this Agreement, the Contractor hiring any core employee shall provide satisfactory proof ( i.e., payroll records, quarterly tax records, driver' s license, voter registration, postal address and such governmental documentation) evidencing the core employee' s qualification as a core employee to the CWA Administrator and the Trades Council.

Section 3. 9 Time for Referral If any Union' s registration and referral system does not fulfill the requirements for specific classifications requested by any Contractor within forty- eight 48) hours ( excluding Saturdays, Sundays and holidays), that Contractor may use employment sources other than the Union registration and referral services and may employ applicants meeting such classification from any other available source. The Contractors shall inform the Union of any applicants hired from other sources and such applicants shall register with the appropriate hiring hall, if any, before commencing work.

Section 3. 10 Lack of Referral Procedure If a signatory Union does not have a job referral system as set forth in Section 3.3 above, the Contractors shall give the Union equal opportunity to refer applicants. Contractors shall notify the Union of craft employees so hired, as set forth in Section 3. 5.

Section 3. 11 Union Membership Employees are not required to become or remain union members or pay dues or fees as a condition of performing Project Work under this Agreement.

Contractors shall make and transmit all deductions for union dues, fees, and assessments that have been authorized by employees in writing in accordance with the applicable Master Labor Agreement. Nothing in this Section 3.11 is intended to supersede independent requirements of applicable Master Labor Agreements as to those Contractors otherwise signatory to such Master Labor Agreements and as to the employees of those Contractors who areperforming Project Work.

Section 3. 12 Individual Seniority Except as provided in Section 4.3, individual seniority shall not be recognized or applied to craft employees performing Project Work; provided, however, that group and/or classification seniority in a Union' s Master Labor Agreement as of the Effective Date of this Agreement shall be recognized for purposes of layoffs.

Community Workforce Agreement 11 City of Anaheim
Section 3. 13 Foremen The selection and number of craft foreman and/or general foreman shall be the responsibility of the Contractor. All foremen shall take orders exclusively from the designated Contractor representatives. Craft foreman shall be designated as working foreman at the request of the Contractors.

Section 3. 14 Out of StateWorkers In determining compliancewith the targetedhiring goalsof Section3.5 above, hours of Project Work performed by residentsof statesother than California will be excluded from the calculation.

ARTICLE 4

UNION ACCESS AND STEWARDS
Section 4. 1 Access to Project Sites Authorized representatives of the Union shall have access to Project Work, provided that they do not interfere with the work of craft employees and further provided that suchrepresentativesshallnotify thepersonchargedwith on -site project supervision andfully comply with postedvisitor, securityand safetyrules.

Section 4. 2 Stewards

4. 2. 1 Each signatory Union shall have the right to dispatch a working journeyperson as a steward for each shift and shall notify the Contractor in writing of the identity of the designated stewardor stewardsprior to the assumptionof suchperson's duties assteward. Suchdesignated steward or stewards shall not exercise any supervisory functions. There will be no non -working stewards. Stewards will receive the regular rate of pay for their respective crafts.

4. 2. 2 In addition to their work as a craft employee, the steward should have the right to receive, but not to solicit, complaints or grievances and to discuss and assist in the adjustment of the same with the craft employee' s appropriate supervisor. Each steward should be concerned only with the craft employees of the steward' s Contractor and, if applicable, subcontractor( s), and not with the craft employees of any other Contractor. A Contractor will not discriminate against the steward in the proper performance of their Union duties.

4. 2. 3 When a Contractor has multiple, non- contiguous work locations at one site, the Contractor may request, and the Union shall appoint, such additional working stewards as the Contractorrequeststo provide independentcoverageof oneor more suchlocations. In suchcases, a steward may not service more than one work location without the approval of the Contractor.

4. 2. 4 The stewards shall not have the right to determine when overtime shall be worked or who shall work overtime.

Section 4. 3 Steward Layoff/ DischaMe Contractor agrees to notify the appropriate Union twenty-four (24) hoursbeforethe layoff of a steward, exceptin the caseof disciplinary discharge for just cause. If the stewardis protected againstsuchlayoff by the provisions of the applicable Master Labor Agreement, such provisions shall be recognizedwhen the stewardpossessesthe necessary qualifications to perform the remaining work. In any case in which the steward is dischargedor disciplinedfor just cause, the appropriateUnion will benotified immediatelyby the Community Workforce Agreement 12 City of Anaheim
Contractor, and such discharge or discipline shall not become final ( subject to any later filed grievance) until twenty-four (24) hoursafter suchnotice hasbeengiven.

ARTICLE 5

WAGES AND BENEFITS
Section 5. 1 Wages All craft employees covered by this Agreement shall be classified in accordancewith work performed and paid by the Contractorsthe hourly wage rates for those classifications in compliance with the applicable prevailing wage rate determination established pursuantto applicablelaw. If aprevailing rate increasesunder law, the Contractorshallpay that rate as of its effective date under the law. This Agreement does not relieve Contractors that are direct signatories to a Master Labor Agreement with one of the Unions signing this Agreement from paying all of the wages set forth in such Agreements.

Section 5. 2 Benefits

5. 2. 1 Contractors shall pay contributions to the established craft employee benefit funds in the amounts designated in the appropriate Master Labor Agreement and make all craft employee — authorized deductions in the amounts designated in the appropriate Master Labor Agreement, however, such contributions shall not exceed the contribution amounts set forth in the applicableprevailing wage determination. This Agreementdoesnot relieve Contractorsthat are direct signatories to one or more of the Master Labor Agreements from making all contributions set forth in those Master Labor Agreements without reference to the foregoing.

5. 2. 2 The Contractor adopts and agreesto be bound by the written terms of the applicable, legally established, trust agreement(s) specifying the detailedbasison which paymentsareto be madeinto, andbenefitspaid out of, suchtrust funds for its employees. The Contractorauthorizes the parties to such trust funds to appoint trustees and successor trustees to administer the trust funds and hereby ratifies and accepts the trustees so appointed as if made by the Contractor.

5. 2. 3 Each Contractor is required to certify under penalty of perjury and provide that certification to the CWA Administrator, who may conclusively rely on such certification, that it haspaid all benefit contributionsdue and owing to the appropriatetrust(s). Further, upon timely notification by a Union to the CWA Administrator, the CWA Administrator shall work with any GCC or Subcontractor who is delinquent in such payments to assure that proper benefit contributions are made.

Section 5. 3 WagePremiumsWagepremiums, including but not limited to pay basedon height of work, hazardpay, scaffoldpay, andspecialskills shall not beapplicableto ProjectWork under this Agreement, except to the extent provided for in any applicable prevailing wage determination.

ARTICLE 6
HOURS OF WORK OVERTIME. SHIFTS AND HOLIDAYS
Section 6. 1 Hours of Work Eight ( 8) hours per day between the hours of 6:00 a.m. and 5:30 p. m., plus one-half ( 1/2) hour unpaid lunch approximately mid -way through the shift, shall Community Workforce Agreement 13 City of Anaheim
constitute the standard work day. Forty ( 40) hours per week shall constitute a regular week' s work.

The work week will start on Sunday and conclude on Saturday. The foregoing provisions of this Section are applicable unless otherwise provided in the applicable prevailing wage determination, construction contract neighborhood -friendly policies, as described in the Project specifications or are agreed upon by the Parties. Nothing herein shall be construed as guaranteeing any employee eight (8) hoursper day or forty ( 40) hoursper week, or a Monday through Friday standardwork schedule.

Section 6. 2 Place of Work Craft employees shall be at their place of work ( as designated by the Contractor), at the starting time and shall remain at their place of work, performing their assigned functions, until quitting time. The place of work is defined as the gang or tool -box or equipment at the employee' s assigned work location or the place where the foreman gives instructions. Except as provided in Section 6.6, there shall be no pay for time not worked unless the employee is otherwise engaged at the direction of the Contractor.

Section 6. 3 Overtime Overtime shall be paid in accordance with the requirements of the applicable prevailing wage determination. There shall be no restriction on the Contractor's scheduling of overtime or the nondiscriminatory designation of employees who will work overtime. There shall be no pyramiding of overtime ( payment of more than one form of overtime compensation for the same hour) under any circumstances.

Section 6. 4 Shifts and Alternate Work Schedules

6. 4. 1 Alternate starting and quitting time and/or shift work may be performed at the option of the Contractor subject to the applicable Master Labor Agreement. If two shifts are worked, each shall consist of eight ( 8) hours of continuous work exclusive of a one- half (%) hour non -paid lunch period, for eight ( 8) hours pay. The last shift shall start on or before 6:00 p.m. The first shift starting at or after 6:00 a.m. is designated asthe first shift, with the second shift following.

6. 4. 2 The Parties recognize the economic impact for Project Work being undertaken by the City andagreethat Partiesto this AgreementdesireandintendProjectWork to beundertaken in an effective manner to the highest standard of quality and craftsmanship. The Parties agree that, except to the extent permitted by law, craft employeesperforming Project Work shall not be entitled to any differentials or additional pay based upon the shift or work schedule of the employees. Instead, all employees working on Project Work shall be paid at the same base rate regardless of shift or work schedule worked, unless required under the applicable prevailing wage determination.

6. 4. 3 It is recognized that the City' s operations and/or mitigation obligations may require restructuring of normal work schedules. Except in an emergency or when specified in the Construction Contract, the Contractor shall give affected Union( s) at least three ( 3) days' notice of such schedule changes.

Section 6. 5 Holidays Recognized holidays for Project Work shall be those set forth and governed by the prevailing wage determination( s) applicable to such Project Work.

Community Workforce Agreement 14 City of Anaheim
Section 6. 6 Show -up Pay

6. 6. 1 Except as otherwise required by State law, craft employees reporting for work and for whom no work is provided, except when given prior notification not to report to work, shall receive pay in accordance with the applicable Master Labor Agreement.

6. 6. 2 A craft employee called out to work outside of their shift shall receive a minimum of two ( 2) hours pay at the appropriate rate. This does not apply to time worked as an extension of before or after) the craft employee' s normal shift.

6. 6. 3 When a craft employee leaves the job or work location of their own volition or is discharged for cause or is not working, the craft employee shall only be paid for actual time worked.

Section 6. 7 Meal Periods The Contractor will schedule a meal period in accordance with the applicable Master Labor Agreement.

Section 6. 8 Make- u . DaN s To the extent permitted by the applicable general wage determination, when a craft employee has been prevented from working for reasons beyond the control of the Contractor, including, but not limited to inclement weather or other natural causes, during the regularly scheduled work week, a make- up day may be worked on a non -regularly scheduled work day subject to prevailing wage law.

ARTICLE 7

WORK STOPPAGES AND LOCK - OUTS
Section 7. 1 No Work Stopliages or Disruptive Activity The Trades Council and the Unions signatory hereto agree that neither they, and each of them, nor their respective officers or agents or representatives, shall incite or encourage, condone or participate in any strike, walk -out, slow- down, picketing, observing picket lines or other activity of any nature or kind whatsoever, for any cause or dispute whatsoever with respect to or in any way related to Project Work, or which interferes with or otherwise disrupts, Project Work, or with respect to or related to the City or Contractors, including, but not limited to, economic strikes, unfair labor practice strikes, safety strikes, sympathy strikes, secondary strikes, sick- out strikes, and jurisdictional strikes whether or not the underlying dispute is arbitrable. Any such actions by the Trades Council, or Unions, or their members, agents, representatives or the employees they represent shall constitute a violation of this Agreement. The Trades Council and the Union shall take all steps necessaryto obtain and maintain compliance with this Article.

Section 7. 2 Employee Violations The Contractor shall discharge any employee violating Section 7.1 above and any such employee will not be eligible for rehire under this Agreement.

Section 7. 3 Standing to Enforce The City or any Contractor affected by an alleged violation of Section 7. 1 shall have standing and the right to enforce the obligations established therein.

Community Workforce Agreement 15 City of Anaheim
Section 7. 4 Expiration of Master Labor Agreement If the Master Labor Agreement, or any local, regional, and other applicable collective bargaining agreements expire during the term of this Agreement, the Union( s) agreethat there shall be no work disruption of any kind as described in Section 7.1 above asa result of the expiration of any such agreement(s) having application under this Agreement and/or failure of the involved parties to the Master Labor Agreement to enter into a new agreement. Terms and conditions of employment established during the term of the Construction Contract shall remain established and set. Otherwise to the extent that the Master Labor Agreement does expire and the parties to that Master Labor Agreement have failed to enter into a new agreement, work will continue under the terms of the Construction Contract on one of the following two ( 2) options, both of which will be offered by the Unions involved to the Contractors that are independently signatory to the affected Master Labor Agreement ( hereinafter Signatory Contractors"):

7. 4. 1 Each of the Unions with a Master Labor Agreement expiring must offer to its SignatoryContractorsthe right to continueworking on the Projectunder interim agreementsthat retain all the terms of the expiring Master Labor Agreement, except that the Unions involved in such expiring Master Labor Agreement may eachpropose wage rates and Contractor contribution ratesto employee benefit funds under the prior Master Labor Agreement different from what those wage rates and Contractor contributions rates that were under the expiring Master Labor Agreements. The terms of the Union' s interim agreement offered to its Signatory Contractors will be no less favorable than the terms offered by the Union to any other Contractors or group of Contractors covering the sametype of construction work in Orange County.

7. 4. 2 Each of the Unions with a Master Labor Agreement expiring must offer to its Signatory Contractorsthe right to continue working on the Project under all the terms of the expiring MasterLabor Agreement, including thewageratesandemployercontribution ratesto the employee benefit funds, if the Signatory Contractor affected by that expiring Master Labor Agreement agrees to the following retroactive provisions: if a new MLA, local, regional or other applicable labor agreement for the industry having application at the Project is ratified and signed during the term of this Agreementandif suchnew labor agreementprovides for retroactivewage increases, then all affectedSignatoryContractorsshall pay to its craft employeeswho performed work coveredby this Agreementat the Project during the hiatus betweenthe effective datesof such expired and new labor agreements, an amount equal to any such retroactive wage increase established by such new labor agreement, retroactive to whatever date is provided by the new labor agreement for such increase to go into effect, for each craft employee' s hours worked on the Project during the retroactive period. All Parties agree that such affected Signatory Contractors shall be solely responsible for any retroactive payment to its craft employees.

7. 4. 3 Some Signatory Contractors may elect to continue to work on the Project under the terms of the interim agreement option offered under paragraph 7.4.1 and other Signatory Contractors may elect to continue to work on the Project under the retroactivity option offered underparagraph7.4.2. To decidebetweenthe two options, Signatory Contractorswill be given one week after the particular Master Labor Agreement has expired or one week after the Union haspersonally delivered to the Signatory Contractorsin writing its specific offer of termsof the interim agreementpursuant to paragraph 7.4.1, whichever is the later date. If the Signatory Community Workforce Agreement 16 City of Anaheim
Contractor fails to timely select one of the two options, the Signatory Contractor shall be deemed to have selected the provisions of 7.4.2.

Section 7. 5 No Lockouts Contractors shall not cause, incite, encourage, condone or participatein anylock -out of craft employeeswith respectto ProjectWork during theterm of this Agreement. The term " lock -out" refers only to a Contractor' s exclusion of craft employees in order to secure collective bargaining advantage, and does not refer to the discharge, termination or layoff of craft employeesby the Contractor for any reasonin the exerciseof rights pursuantto any provision of this Agreement, or any other agreement, nor does " lock - out" include the City' s decision to stop, suspend or discontinue any Project Work or any portion thereof for any reason.

Section 7. 6 Best Efforts to End Violations

7. 6. 1 If a Contractor contends that there is any violation of this Article, it shall notify, in writing, the Executive Secretaryof the Trades Council, the Senior Executive of the involved Union( s) and the CWA Administrator. The Executive Secretary and the leadership of the involved Union(s) will promptly notify andusetheir bestefforts to causethe cessationof anyviolation of this Article.

7. 6. 2 If the Union contends that any Contractor has violated this Article, it will notify the Contractor and the CWA Administrator, setting forth the facts which the Union contends violate theAgreement, at leasttwenty-four (24) hoursprior to invoking theproceduresof Section7.8.

Section 7. 7 Withholding of Services for Failure to Pay Wages and Fringe Benefits

7. 7. 1 Notwithstanding any provision of this Agreement to the contrary, it shall not be a violation of this Agreement for any Union to withhold the services of its members ( but not the right to picket) from aparticular Contractorwho:
a) fails to timely pay its weekly payroll; or
b) fails to make timely payments to the Union' s Joint Labor/ Management Trust Fund( s) in accordance with the provisions of the applicable Master Labor Agreements. Prior to withholding its members' services for the Contractor' s failure to make timely payments to the Union' s Joint Labor/ Management Trust Fund( s), the Union shall give at least ten ( 10) days (unless a lesserperiod of time is provided in the Union' s Master Labor Agreement, but in no event less than forty- eight ( 48) hours written notice of such failure to pay to the involved Contractor and to the CWA Administrator. Union will meet with the Contractor within the ten ( 10) day period to attempt to resolve the dispute.

7. 7. 2 Upon the paymentof the delinquentContractorof all moniesdue andthenowing for wages and/ or fringe benefit contributions, the Union shall direct its members to return to work and the Contractor shall return all such craft employees back to work. Notwithstanding anything to the contrary, the provisions for liquidated damages or any other delay related damages under the Construction Contract remain in full force and effect.

Community Workforce Agreement 17 City of Anaheim
Section 7. 8 Expedited Enforcement Procedure Any Party, including the City, which the Parties agree is a Party to the Agreement for purposes of this Article and an intended beneficiary of this Article, or the CWA Administrator, may institute the following procedures, in lieu of or in addition to anyotheraction at law or equity, whenabreachof Section7.1or 7.5, above, or Section

8. 3 is alleged.

7. 8. 1 The Party invoking this procedureshall notify the first arbitrator identified in the List of Arbitrators attached hereto as Attachment D. If this arbitrator identified in Attachment D is unavailable, thePartyinvoking this procedureshallnotify thenext arbitratorlisted. Shouldnone of the named arbitrators be available, an alternate arbitrator mutually agreed upon by the Parties will be selected to hear the matter. Expenses incurred in arbitration shall be borne equally by the Contractor and Unions involved in the arbitration and the decision of the arbitrator shall be final and binding on the Contractorand Unions, provided, however, that the arbitrator shall not have the authority to alter or amendor add to or deletefrom the provisions of this Agreementin any way. Notice to the arbitrator shall beby the mostexpeditiousmeansavailable, with noticesto the Parties alleged to be in violation, and to the Trades Council if it is a Union alleged to be in violation.

For purposesof this Article, written notice may be given by certified mail and will be deemed effective upon receipt.

7. 8. 2 Upon receipt of said notice, the arbitrator selected shall sit and hold a hearing within twenty-four (24) hoursif it is contendedthat theviolation still exists, but not soonerthantwenty- four ( 24) hours after notice has been dispatched to the Executive Secretary and the Senior Official( s) as required by Section 7.6, as above.

7. 8. 3 The arbitrator shall notify the Parties of the place and time chosen for this hearing.

Said hearing shall be completed in one session, which, with appropriate recesses at the arbitrator' s discretion, shall not exceed 24 hours unless otherwise agreed upon by the Contractor and Unions.

A failure of anyContractoror Union to attendsaidhearingsshallnot delaythehearingof evidence or the issuance of any award by the arbitrator.

7. 8. 4 The sole issue at the hearing shall be whether or not a violation of Sections 7.1 or

7.5, or 8.3 has in fact occurred. The arbitrator shall have no authority to consider any matter in justification, explanationor mitigation of such violation. The award shall be issuedin writing within three ( 3) hours after the close of the hearing and may be issued without an opinion. If the Contractor or Unions desires a written opinion, one shall be issued within fifteen ( 15) days, but its issuance shall not delay compliance with, or enforcement of, the award. The arbitrator may order cessation of the violation of the Article and other appropriate relief, and such award shall be served on all Partiesby handor certified mail upon issuance.

7. 8. 5 Such award shall be final and binding on Contractor and Unions and may be enforcedby any court of competentjurisdiction upon the filing of this Agreement andall other relevant documents referred to herein above in the following manner. Written notice of the filing of such enforcementproceedingsshall be given to the affected Contractor and Union. In any judicial proceedingto obtain a temporary order enforcing the arbitrator's award asissuedunder this Article, the Contractor and Unions waive the right to a hearing and agreethat such proceedings may be exparte. Suchagreementdoesnot waive the Contractoror Unions' right to participatein Community Workforce Agreement 18 City of Anaheim
a hearing for a final order of enforcement. The court' s order or orders enforcing the arbitrator' s awardshall be servedon the ContractorandUnions by handor by certified mail.

7. 8. 6 Any rights created by statute or law governing arbitration proceedings inconsistent with the aboveprocedureor which interfere with compliancehereto are hereby waived by the Contractor or Unions to whom they accrue.

7. 8. 7 The fees and expenses of the arbitrator shall be equally divided between the Contractor and Union involved in the matter.

ARTICLE 8

WORK ASSIGNMENTS AND JURISDICTIONAL DISPUTES
Section 8. 1 Assignment of Work The assignment of Project Work will be solely the responsibility of the Contractorperforming thework involved; andsuchwork assignmentswill be in accordance with the Plan for the Settlement of Jurisdictional Disputes in the Construction Industry ( the " Plan") or any successor Plan.

Section 8. 2 The Plan All jurisdictional disputes on Project Work between or among the building and construction trades Unions and the craft employers parties to this Agreement, shall be settled and adjustedaccordingto the presentPlan establishedby the Building and ConstructionTrades Departmentor any other plan or method of procedurethat may be adoptedin the future by the Building and Construction TradesDepartment. Decisions renderedshall be final, binding and conclusive on the Contractor and Unions involved in the dispute.

8. 2. 1 If a dispute arising under this Article involves the Western States Regional Council of Carpentersor any of its subordinatebodies, an Arbitrator shall be chosenby the procedures specified in Article V, Section 5, of the Plan from a list composed of John Kagel, Robert Hirsch, andThomasPagan, andthe Arbitrator' s hearing on the disputeshall be held at the offices of the Trades Council within 14 days of the selection of the Arbitrator. All other procedures shall be as specified in the Plan.

Section 8. 3 No Work Disru otion Over Jurisdiction All jurisdictional disputes shall be resolved without the occurrence of any strike, work stoppage, or slow -down of any nature, and the Contractor' s assignment shall be adhered to until the dispute is resolved. Individuals violating this section shall be subject to immediate discharge.

Section 8. 4 Pre -Job Conferences As provided in Article 16, each Contractor will conduct a prejob conferencewith the appropriateaffectedUnion(s) prior to commencingwork; provided however, at no time shall the City be responsible for additional costs related to, associated with, or resulting from Union( s) jurisdictional disputes. The Trades Council and the CWA Administrator shall be advised in advance of all such conferences and may participate if they wish.

Section 8. 5 Resolution of Jurisdictional Disputes If any actual or threatened strike, sympathy strike, work stoppage, slow down, picketing, hand -billing or otherwise advising the public that a labor disputeexists, or interferencewith theprogressof ProjectWork by reasonof ajurisdictional Community Workforce Agreement 19 City of Anaheim
dispute or disputes occurs, the Parties shall exhaust the expedited procedures set forth in the Plan, if such procedures are in the plan then currently in effect, or otherwise as in Article 7 above.

ARTICLE 9

MANAGEMENT RIGHTS
Section 9. 1 Contractor and Cit% Rights The Contractors and the City have the sole and exclusive right and authority to oversee and manage Project Work activities without any limitations unless expressly limited or required by a specific provision of this Agreement or a Master Labor Agreement. In addition to the following and other rights of the Contractors enumeratedin this Agreement, the Contractorsexpresslyreservetheir managementrights andall the rights conferred upon them by law. The Contractor' s rights include, but are not limited to, the right to:
a) Plan, direct and control all work activities;
b) Hire, promote, transfer and layoff craft employees, respectively, as deemed appropriate to satisfy work and/or skill requirements;
c) Promulgate and require all craft employees to observe reasonable job rules and security and safety regulations;
d) Discharge, suspend or discipline craft employees for just cause; e) Utilize, in accordance with City approval, any work methods, procedures or techniques, and select, use and install any types or kinds of materials, apparatus or equipment, regardless of source of manufacture or construction; assign and schedule work at their discretion; and
f) Assign overtime, determine when it will be worked and the number and identity of employees engaged in such work, subject to such provisions in the applicable Master Labor Agreement( s) requiring such assignments be equalized or otherwise made in a nondiscriminatory manner.

Section 9. 2 Specific City Rights In addition to the following and other rights of the City enumerated in this Agreement, the City expressly reserves its management rights and all the rights conferred on it by law. The City' s rights ( and those of the CWA Administrator on its behalf) include, but are not limited to the right to:
a) Inspect any construction site or facility to ensure that the Contractor follows the applicable safety and other work requirements;
b) Require Contractors to establish a different work week or shift schedule for particular craft employeesas required to meet the operationalneedsof the Project Work at a particular location;
Community Workforce Agreement 20 City of Anaheim
c) At its sole option, terminate, delay and/or suspend any and all portions of the ProjectWork at anytime; prohibit someor all work on certaindaysor during certainhoursof the day to accommodatethe ongoing City servicesand/or to mitigate the effect of ongoing Project Work on businesses and residents in the neighborhood of the Project site; and/ or require such other operational or schedule changes it deems necessary, in its sole judgment, to effectively maintain City servicelevels andremain a good neighbor to thosein the areaof the Project Work. In order to permit the ContractorsandUnions to make appropriateschedulingplans, the City will provide the CWA Administrator and the affected Contractor( s) and Union( s) with reasonable notice of any changesit requirespursuantto this section; provided, however, that if notice is not provided in time to advise craft employees not to report for work, show -up pay shall be due pursuant to the provision of Article 6.

Section 9. 3 Use of Materials There will be no limitations or restrictions by Unions upon a Contractor' s choice of materials, design, or utilization of equipment, machinery, packaging, precast, prefabricated, prefinished, or preassembledmaterials, tools or otherlabor savingdevices, subject to the application of the State Public Contracts and Labor Codes as required by law. The onsite installation or application of such items shall be performed by the craft having jurisdiction over such work.

Section 9. 4 Special EquiGiment. Warranties, and Guaranties

9. 4. 1 It is recognized that certain equipment of a highly technical and specialized nature as specified by the City or manufacturer may be installed at Project Work sites. The nature of the equipment, together with the requirements for manufacturer' s warranties, may dictate that it be prefabricated, pre -piped and/or pre -wired and that it be installed under the supervision and direction of the City' s and/or manufacturer' s personnel. Unless otherwise required to prevent the loss of or negate manufacturer warranties, the Unions agree to install such equipment without incident and asrequired by the manufacturer( s).

9. 4. 2 The Parties recognize that the Contractor will initiate from time to time the use of new technology, equipment, machinery, tools, and other labor -savings devices and methods of performing ProjectWork. TheUnion agreesthat they will not restrict the implementationof such devices or work methods. The Unions will accept and will not refuse to handle, install or work with any standardized and/or catalogue: parts, assemblies, accessories, prefabricated items, preassembleditems, partially assembleditems, or materialswhatevertheir sourceof manufacture or construction.

9. 4. 3 If any disagreement between the Contractor and the Unions concerning the methods of implementation or installation of any equipment, or device or item, or method of work, arises, or whether a particular part or pre -assembleditem is a standardizedor catalogpart or item, the Project Work will precede as directed by the Contractor and the Parties shall promptly consult over the matter. If the disagreement is not resolved, the affected Union( s) shall have the right to proceed through the procedures set forth in Article 10.

Community Workforce Agreement 21 City of Anaheim
ARTICLE 10

SETTLEMENT OF GRIEVANCES AND DISPUTES
Section 10. 1 Cooperation and Harmony on Site

10. 1. 1 This Agreement is intended to establish and foster continued close cooperation between the City, Contractors, and Unions. The Trades Council shall assign a representative to this Agreement for the purpose of assisting the local Unions, and working with the CWA Administrator, together with the Contractors, to complete the Project Work efficiently, continuously and without any interruption, delays or work stoppages.

10. 1.2 The Contractors and Unions, will attempt to resolve disputes in accordance with the grievance provisions set forth in this Article or, as appropriate, those of Article 7 or 8.

10.1.3 The CWA Administrator shall facilitate the processing of grievances under Articles 7, 8, and 10, including the scheduling and arrangements of facilities for meetings, and any other administrative matters necessary to facilitate the timely resolution of any dispute; provided, however, it is the responsibility of the Contractors and Unions to any pending grievance to insure the time limits and deadlines are met.

Section 10. 2 Processing Grievances Any questions arising out of and during the term of this Agreementinvolving its interpretationand application, which includes applicableprovisions of the Master Labor Agreement, but not jurisdictional disputes or alleged violations of Section 7.1 and 7.4 and similar provisions, shall be considered a grievance and subject to resolution under the following procedures.

Step 1. Employee Grievances When any craft employee subject to the provisions of this Agreement feels aggrieved by an alleged violation of this Agreement, the craft employee shall, through their local Union business representative or, job steward, within ten ( 10) working daysaftertheoccurrenceof theviolation, give noticeto thework siterepresentativeof theinvolved Contractor stating the provision( s) alleged to have been violated. A business representative of the local Union or the job steward and the work site representative of the involved Contractor shall meet and endeavor to resolve the matter within ten ( 10) working days after timely notice has been given. If they fail to resolvethematterwithin theprescribedperiod, thegrieving party may, within ten ( 10) working days thereafter, pursue Step 2 of this grievance procedure provided the grievance is reduced to writing, setting forth the relevant information, including a short description thereof, the date on which the alleged violation occurred, and the provision( s) of the Agreement alleged to have been violated. Grievances and disputes settled at Step 1 shall be non-precedential except as to the parties directly involved.

Union or Contractor Grievances Should the Union( s) or any Contractor( s) have a dispute and, if after conferring within ten ( 10) working days after the disputing Union( s) or Contractor( s) knew or should have known of the facts or occurrence giving rise to the dispute, a settlement is not reached within five ( 5) working days, the dispute shall be reduced to writing and processedto Step2 in the samemannerasoutlined in Step 1 abovefor the adjustmentof a craft employee complaint.

Community Workforce Agreement 22 City of Anaheim
Step 2. The business manager of the involved Union or their designee, together with the site representative of the involved Contractor, shall notify the CWA Administrator, and conduct a meeting betweenthe Union andthe Contractorwithin seven (7) working days of the referral of the dispute to this second step to arrive at a satisfactory settlement thereof. If the Union( s) and Contractor( s) fail to reach an agreement, the dispute may be appealed in writing in accordance with the provisions of Step 3 within seven (7) calendar days after the initial meeting at Step 2.

Step 3. ( a) If the grievance shall have been submitted but not resolved under Step 2, either the Union( s) or Contractor( s) may proceed with the selection of an arbitrator from Attachment D, on a rotational basis in the order listed within seven ( 7) calendar days after the initial Step2 meeting. TheUnion(s) andContractor(s) shallnotify the CWA Administrator of the date, time andrequesta meeting location for the hearing. The failure of any party to attend said hearingshall not delay the hearing of evidenceor the issuanceof any decisionby the arbitrator.

The decision of the arbitrator shall be final and binding on all parties. b) Failure of the grieving Party to adhere to the time limits established herein shall render the grievance null and void. The time limits established herein may be extended only by consent of the Union( s) and Contractor( s) involved at the particular step where the extension is agreed upon. The arbitrator shall have the authority to make decisions only on issues presentedand shall not have the authority to change, amend, add to or detractfrom any of the provisions of this Agreement.
c) The fees and expenses incurred by the arbitrator, as well as those jointly utilized by the Union( s) and Contractor( s) in arbitration, shall be divided equally by the Union( s) and Contractor( s) involved. The City is responsible for providing meeting locations where the arbitration takes place.

Section 10. 3 Limit on Use of Procedures The procedures contained in Article 10 shall not be applicable to any alleged violation of Articles 7 or 8, with a single exception that any craft employee discharged for violation of Section 7.2, or Section 8.3, may resort to the procedures of Article 10 to determine only if he/she was, in fact, engaged in that violation.

Section 10. 4 Notice The CWA Administrator ( and the City, in the case of any grievance regarding the Scope of this Agreement), shall be notified by the involved Contractor of all actions at Steps 2 and 3, and further, the CWA Administrator shall, upon their own request, be permitted to participate fully as a party in all proceedings at such steps.

ARTICLE 11

REGULATORY COMPLIANCE
Section l l. 1 Compliance with All Laws The Trades Council and all Unions, Contractors, and their employees shall comply with all applicable federal, and state laws, ordinances and regulations including, but not limited to, those relating to safety and health, employment and applications for employment. All employees shall comply with the safety regulations established by the City, the Community Workforce Agreement 23 City of Anaheim
CWA Administrator or the Contractor. Employees must promptly report any injuries or accidents to a supervisor.

Section 11. 2 Prevailing Wage Compliance All Contractors shall comply with the statelaws and regulations, as well asthe Anaheim City Charter, or resolutions on prevailing wages. Compliance with this obligation may be enforced by the appropriate parties through Article 10 above, or by pursing the remedies available under statelaw through the Labor Commissioner or the Department of Industrial Relations.

Section 11. 3 Violations of Law Should there be a finding by a Court or administrative tribunal of competent jurisdiction that a Contractor has violated federal and/or state law or regulation, he City, uponnotice to the Contractorthat it or its subcontractorsis in suchviolation (including any finding of non-compliance with the California prevailing wage obligations as enforced pursuant to DIR regulations), the City, and in the absence of the Contractor or subcontractor remedying such violation, may take such action as it is permitted by law or contract to encourage that Contractor to come into compliance, including, but not limited to, assessing fines and penalties subject to the applicable Construction Contract and the California Public Contract Code.

ARTICLE 12

SAFETY AND PROTECTION OF PERSON AND PROPERTY
Section 12. 1 Safety

12.1.1 It shall be the responsibility of each Contractor to ensure safe working conditions and craft employee compliance with applicable safety regulations established by the Division of Occupational Safety and Health ( Cal/OSHA), or City safety rules, or Contractor safety rules. It is understood that craft employees have an individual obligation to use diligent care to perform their work in a safemannerandto protect themselvesandtheproperty of the Contractorandthe City.

12.1.2 Craft employees shall be bound by the safety, security and visitor rules established by the Contractorand/or the City. Theserules will be published andposted. A craft employee's failure to satisfy their obligations under this section will subject him/ her to discipline, up to and including discharge.

12.1.3 The Contractor shall comply with the Substance Abuse Policy attached hereto as Attachment E, or utilize their previously established and written policy for work performed under this Agreement.

Section 12. 2 Water and Sanitary Facilities The Contractor shall provide adequate supplies of drinking water and sanitary facilities for all craft employees as required by state law or regulation.

ARTICLE 13

TRAVEL AND SUBSISTENCE
Community Workforce Agreement 24 City of Anaheim
Travel expenses, travel time, subsistence allowances, zone rates, and parking reimbursementsshall bepaid in accordancewith the applicableMaster Labor Agreementunless superseded by the applicable prevailing wage determination.

ARTICLE 14

APPRENTICES
Section 14. 1 Importance of Training, The Parties recognize the need to maintain continuing support of the programs designedto develop adequatenumbers of competentworkers in the construction industry, the obligation to capitalizeon the availability of the Local Hires, and the opportunities to provide continuing work under the construction program. To these ends, the Parties will facilitate, encourage, and assist Local Hires to commence and progress in Labor/ Management Apprenticeship and/or training programs in the construction industry leading to participation in such apprenticeshipprograms. The City and the Trades Council will work cooperatively to identify, or establish and maintain, effective programs and procedures for persons interested in entering the construction industry and which will help prepare them for the formal joint labor/managementapprenticeshipprogramsmaintainedby the signatoryUnions.

Section 14. 2 Use of Apprentices

14. 2. 1 Apprentices used on Projects under this Agreement shall be registered in Joint Labor Management Apprenticeship Programs approved by the State of California. Apprentices may comprise up to thirty percent ( 30%) of each craft' s work force ( calculated by hours worked) at any time, unlessthe standardsof the applicablejoint apprenticeshipcommittee confirmedby the Division of Apprenticeship Standards (" DAS"), establish a lower or higher maximum percentage. Where the standards permit a higher percentage, such percentage shall apply on Project Work. Where the applicable standards establish a lower percentage, the applicable Union will use its best efforts with the Joint Labor Management apprenticeship committee and, if necessary, the DAS to permit up to thirty percent ( 30%) apprentices on the Project.

14.2.2 The Unions agree to cooperate with the Contractor in furnishing Apprentices as requested up to the maximum percentage. The apprentice ratio for each craft shall be in compliance, at a minimum, with the applicable provisions of the Labor Code relating to utilization of apprentices. The City shall encourage such utilization, and, both as to Apprentices and the overall supply of journeyman. The Unions and TradesCouncil will work to provide appropriate and maximum utilization of Apprentices and the continuing availability of both apprentices and journey - level craft workers.

14.2.3 The Parties agree that apprentices will not be dispatched to Contractors working under this Agreement unless there is a journeyman working on the Project where the Apprentice is to be employedwho is qualified to assistand overseethe Apprentice's progressthrough the program in which he/she is participating.

14.2.4 All apprentices shall work under the direct supervision of a journeyman from the trade in which the apprentice is indentured. A journeyman shall be defined as set forth in the California Code of Regulations, Title 8 [apprenticeship] section 205, which defines ajourneyman Community Workforce Agreement 25 City of Anaheim
as a person who has either completed an accredited apprenticeship in his or her craft, or has completed the equivalent of an apprenticeship in length and content of work experience and all other requirements in the craft which has workers classified asjourneyman in the apprenticeable occupation. Should a question arise as to a journeyman' s qualification under this subsection, the Contractorshallprovide adequateproof evidencingtheworker' s qualification asajourneymanto the Trades Council.

ARTICLE 15

WORKING CONDITIONS
Section 15. 1 Working conditions shall be established by the Contractor to meet all Federal, state, and local requirements, as well as those set forth in the Master Labor Agreements.

ARTICLE 16

PRE - JOB CONFERENCES
Section 16. 1 Each Primary Contractor which is awarded a Construction Contract by the City for Project Work shall conduct a Pre - Job conference with the appropriate affected Union( s) at least ten ( 10) days prior to commencing Project Work. All Subcontractors that have been awarded contracts by the GCC shall attend the Pre -Job conference. The Trades Council and the CWA Administrator shall be advisedin advanceof all suchPre -Job conferencesandmay participateif they wish. All work assignments shall be disclosed by the GCC and all Subcontractors at the Pre - Job conference in accordance with industry practice. Should there be any formal jurisdictional dispute raised under Article 8, the CWA Administrator shall be promptly notified. The GCC shall haveavailable at the Pre -Job conferencethe plans and drawing for the work to be performedon the Project. Should additional Project Work not previously included within the scope of the Project Work be added, the Contractors performing such work will conduct a separate Pre -Job conference for suchnewly includedwork. At no time shallthe City beresponsiblefor additional costsrelated to, associated with, or resulting from jurisdictional disputes or newly included work not previously identified in the Construction Contract.

ARTICLE 17

LABOR/ MANAGEMENT COOPERATION
Section 17. 1 Joint Committee The Parties to this Agreement may establish a six ( 6) person Joint Administrative Committee ( JAC). This JAC shall be comprised of three ( 3) representatives selectedby the City and three (3) representativesselectedby the Trades Council to monitor compliance with the terms and conditions of this Agreement and to recommend amendments to this Agreement, with the exception of the dollar threshold specified in Section 2. 2.( a) and the term of this Agreement under Section 22. 1, when doing so would be to the mutual benefit of the Parties.

Any amendmentto this Agreementwill require City Council approval. Eachrepresentativeshall designate an alternate who shall serve in his or her absencefor any purpose contemplated by this Agreement. A quorumwill consistof at leasttwo (2) representativesselectedby the City andat least two ( 2) representatives selected by the Trades Council. For voting purposes, only an equal number of City and Union representatives present may constitute a voting quorum.

Community Workforce Agreement 26 City of Anaheim
Section 17. 2 Functions of Joint Committee The Committee shall meet on a schedule to be determined by the Committee or at the call of the joint chairs, to discuss the administration of the Agreement, the progress of the Project, general labor management problems that may arise, and any other matters consistent with this Agreement. Substantive grievances or disputes arising under Articles 7, 8 or 10 shall not be reviewed or discussed by this Committee, but shall be processed pursuant to the provisions of the appropriate Article. The CWA Administrator shall be responsible for the scheduling of the meetings, the preparation of the agendatopics for the meetings, with input from the Unions, the Contractors, and the City. Notice of the date, time, and place of meetings, shall be given to the Committee members at least three (3) days prior to the meeting. The CWA Administrator shall prepare quarterly reports on apprentice utilization and the training and employment of City residents, and a schedule of Project Work and estimated number of craft workers needed. The Committee or an appropriate subcommittee, may review such reports and make any recommendations for improvement, if necessary, including increasing the availability of skilled trades, and the employment of local residents or other individuals who should be assisted with appropriate training to qualify for apprenticeship programs.

ARTICLE 18

SAVINGS AND SEPARABILITY
Section 18. 1 Savings Clause It is not the intention of the City, the CWA Administrator, Contractor, or the Union parties to violate any laws governing the subject matter of this Agreement.

The Parties hereto agree that in the event any provision of this Agreement is finally held or determined to be illegal or void as being in contravention of any applicable law or regulation, the remainder of the Agreement shall remain in full force and effect unless the part or parts so found to be void are wholly inseparable from the remaining portions of this Agreement. Further, the Parties agree that if and when any provision( s) of this Agreement is finally held or determined to be illegal or void by a court of competent jurisdiction, the Parties will promptly enter into negotiations concerning the substantive effect of such decision for the purposes of achieving conformity with the requirements of any applicable laws and the intent of the Parties hereto. If the legality of this Agreement is challenged and any form of injunctive relief is granted by any court, suspending temporarily or permanently the implementation of this Agreement, then the Parties agree that all Project Work that would otherwise be covered by this Agreement should be continued to be bid and constructed without application of this Agreement so that there is no delay or interference with the ongoing planning, bidding and construction of any Project Work.

Section 18. 2 Effect of Injunctions or Other Court Orders The Parties recognize the right of the City to withdraw, at its absolute discretion, the utilization of the Agreement as part of any bid specification should a Court of competent jurisdiction issue any order, or any applicable statute which could result, temporarily or permanently in delay of the bidding, awarding and/or construction of the Project. Notwithstanding such an action by the City, or such court order or statutory provision, the Parties agree that the Agreement shall remain in full force and effect on covered Project Work; provided however, that the continuance of the Project is not determined to be financially or legally detrimental to the City, at its sole and absolute discretion.

Community Workforce Agreement 27 City of Anaheim
ARTICLE 19
WAIVER
A waiver of or a failure to assertany provisions of this Agreement by any or all of the Parties hereto shall not constitute a waiver of such provision for the future. Any such waiver shall not constitute a modification of the Agreement or change in the terms and conditions of the Agreement and shall not relieve, excuse or release any of the Parties from any of their rights, duties or obligations hereunder.

ARTICLE 20

AMENDMENTS
The provisions of this Agreement can be renegotiated, supplemented, rescinded or otherwise altered only by mutual agreementin writing, hereafter signedby the negotiating Partieshereto. In the event of any conflict or ambiguity betweenthis Agreement and any Attachment or exhibit, the provisions of this Agreement shall govern.

ARTICLE 21

DURATION OF THE AGREEMENT
Section 21. 1 Duration

21. 1.1 This Agreement shall be effective from the initial date of approval by City Council, and shall remain in effect for a period of ten ( 10) years. This Agreement may be terminated by written agreement signed by the Parties; provided however, that any covered Construction Contract approved Any covered Project Work awarded during the term of this Agreement shall continue to be covered hereunder, until completion of the Project Work, notwithstanding the termination or expiration date of this Agreement.

21.1.2 This Agreement may be extendedby amendment, asapprovedby the City Council.

IN WITNESS whereof the Parties have causedthis SecondAmended and Restated Community Workforce Agreement to be executedasof the date and year above stated.

CITY OF ANAHEIM
a municipal corporation
By:

Rudy Emami
Director of Public Works
DATE: O 2 2''

LOS ANGELES/ ORANGE COUNTIES

BUILDING & CONSTRUCTION

TRADES CO
By.

Exe2cutiv Secretary
DATE L'5d / z _
Community Workforce Agreement 28 City of Anaheim
DATE:

APPROVED AS TO FORM:

ANAHEIM CITY ATTORNEY' CE
By:

Bryn . N7orley, Deputy C' orney
Community Workforce Agreement 29 City of Anaheim
ocusign Envelope ID: D6BEFC32- 2498- 42CE- 8BF2- 0119BB7998DF

LOS ANGELES/ ORANGE COUNTIES BUILDING AND CONSTRUCTION

TRADES COUNCIL CRAFT UNIONS AND DISTRICT COUNCILS
0-. 3b. dW.

Asbestos Heat & Frost Insulators ( Local 5)
Boilermakers ( Local 92) r_ shim.Ws
Bricklayers & Allied Craftworkers ( Local 4)
W:.._.

Cement Masons ( Local 500) f
District Council of Laborers FjZpmd- e
Electricians ( Local 441)
Elevator Constructors ( Local 18)
Gunite Workers ( Local 345)
Iron Workers ( Reinforced — Local 416)
Iron Workers ( Structural — Local 433)
Laborers ( Local 300) ( remediation)
Laborers ( Local 652)
Laborers ( Local 1184)
Operating Engineers (Local 12)
OperatingEngineers (Local 12)
Operating Engineers (Local 12)
Painters & Allied Trades DC 36
Pipe Trades ( Steamfitters Local 250)
Pipe Trades ( Local 345)
Pipe Trades ( Plumbers/ Fitters Local 582)
Pipe Trades ( Sprinkler Fitters Local 709)
Plasterers ( Local 200)
Plaster Tenders Local ( 1414)
Roofers & Waterproofers ( Local 220)
Sheet Metal Workers ( Local 105)
Teamsters ( Local 986)
Western States Regional Council of Carpenters
ro mMaK•
l,ai, jaw ov_
F
S KdiOKSiDNten_
r
a
I
S, ud — 1l2G'
6,— I,_ rya
c
Goi )e" i G.
resw), 60"wariW.

E
2ft-
W.
f1DN
A.. CoowE,
En,
dR EhwieH, -
w ]
1MFN1F._ EWVEFpC9!
lMEJ... C

11. tl Community
Workforce Agreement30 City of Anaheim

LOS ANGELES/ ORANGE COUNTIES BUILDING AND CONSTRUCTION

TRADES COUNCIL CRAFT UNIONS AND DISTRICT COUNCILS
Asbestos Heat & Frost Insulators ( Local 5)
Boilermakers ( Local 92)
Bricklayers & Allied Craftworkers ( Local 4)
Cement Masons ( Local 500)
District Council of Laborers
Electricians ( Local 441)
Elevator Constructors ( Local 18)
Gunite Workers ( Local 345)
Iron Workers ( Reinforced — Local 416)
Iron Workers ( Structural — Local 433)
Laborers ( Local 300) ( rernediation)
Laborers ( Local 652)
Laborers ( Local 1184)
OperatingEngineers (Local 12)
OperatingEngineers (Local 12)
OperatingEngineers (Local 12)
Painters & Allied Trades DC 36
Pipe Trades ( Steamfitters Local 250)
Pipe Trades ( Local 345)
Pipe Trades ( Plumbers/ Fitters Local 582)
Pipe Trades ( Sprinkler Fitters Local 709)
Plasterers ( Local 200)
Plaster Tenders Local ( 1414)
Roofers & Waterproofers ( Local 220)
Sheet Metal Workers ( Local 105)
Teamsters ( Local 986)
Western States Regional Council of Carpenters
Community Workforce Agreemem 30 City of Anaheim

ATTACHMENT A

LETTER OF ASSENT
To be signed by all Contractors awarded Project Work covered by the Second Amended and Restated Community Workforce Agreement with the City of Anaheim prior to commencing work.

Contractor' s Letterhead]
CWA Administrator
City of Anaheim Public Works Department
200 S. Anaheim Blvd., Second Floor
Anaheim, CA 92805
Attn: CWA Administrator, Construction Services Division Re: Second Amended and Restated Community Workforce Agreement - Letter of Assent Dear CWA Administrator:

This is to confirm that [nameof company] agreesto beparty to andboundby the SecondAmended and Restated Community Workforce Agreement with the City of Anaheim effective , 2024, as such Agreement may, from time to time, be amended by the negotiating parties or interpretedpursuantto its terms. Suchobligation to be aparry andboundby this Agreementshall extend to all Project Work covered by the Second Amended and Restated Community Workforce Agreement undertaken by [ name of company] on the Project and [name of company] shall require all of its contractors and subcontractors of whatever tier to be similarly bound for all Project Work within the scope of the Second Amended and Restated Community Workforce Agreement by signing andfurnishing to you an identical letter of assentprior to their commencementof work.

Sincerely.

Name of Construction Company]
By: [ j Name andTitle of Authorized Executive
Contractor State License No.:

Copies of this letter must be submitted to the CWA Administrator and to the Trades Council Consistent with Section 2. 6.( b).]
Community Workforce Agreement 31 City of Anaheim

ATTACHMENT B
Tier 1
Anaheim
92801 92807 92816
92802 92808 92817
92803 92809 92825
92804 92812 92899
92805 92814
92806 92815
Tier 2
Buena Park Yorba Linda Placentia Fullerton
90620 92885 92811 92831
90621 92886 92870 92832
90622 92887 92871 92833
90624 92834
92835
92836
92837
92838
Cypress Stanton Garden Grove Orange
90630 90680 92840 92869
92841
92842
92843
Tier 3
Remaining zip codes in Orange County
90623 92602 92614
90631 92603 92615
90632 92604 92616
90633 92605 92617
90720 92606 92618
90721 92607 92619
90740 92609 92620
90742 92610 92623
90743 92612 92624
Community Workforce Agreement 32 City of Anaheim
92625 92673 92711
92626 92674 92712
92627 92675 92728
92628 92676 92735
92629 92677 92780
92630 92678 92781
92637 92679 92782
92646 92683 92799
92647 92684 92821
92648 92685 92822
92649 92688 92823
92650 92690 92844
92651 92691 92845
92652 92692 92846
92653 92693 92850
92654 92694 92856
92655 92697 92857
92656 92698 92859
92657 92701 92861
92658 92702 92862
92659 92703 92863
92660 92704 92864
92661 92705 92865
92662 92706 92866
92663 92707 92867
92672 92708 92868
Community Workforce Agreement 33 City of Anaheim

ATTACHMENT C

CITY OF ANAHEIM CWA

CRAFT REQUEST FORM
TO THE CONTRACTOR: Please complete and submit this form to the applicable Union to request craft workers that fulfill the hiring requirements for this Project. After submitting your request, please call the Union Local to verify receipt and substantiate their capacity to furnish workers asspecified below. Pleasekeep copies for your records.

The SecondAmended andRestatedCommunity Workforce Agreement with the City of Anaheim establishesa goal that 40% of the total work hours shall be from Local Hires, defined in the Agreement as follows: Tier 1: Residents of City of Anaheim, Veterans, regardlessof residency; Tier 2: Residentsof Cities of BuenaPark, Yorba Linda, Placentia, Fullerton, Cypress, Stanton, Garden Grove, and Orange, and graduates of Anaheim High Schools, regardless of residency; and MC3 Graduates, regardless of residency; Tier 3: Residents of the remaining zip codes in Orange County and Disadvantaged Individuals ( defined as " formerly homelessindividuals or referrals from non-profit organizations suchasChrysalis OrangeCounty or The Salvation Army"), regardlessof residency. There is also a goal that 5% of the total work hours shall be from Veterans, DisadvantagedIndividuals, and Anaheim high schools graduates.

TO THE UNION: Please complete the " Union Use Only" section on the next page and fax this form back to the requesting Contractor. Be sure to retain a copy of this form for your records.

To: Union Local #
Cc: CWA Administrator
From: Company:

Contact Phone

CONTRACTOR USE ONLY
Fax#
Issued By:

Contact Fax:

Date:

PLEASE PROVIDE ME WITH THE FOLLOWING UNION CRAFT WORKERS.

Craft Classification
i.e., plumber, painter,
etc.)
Journeyman
or
Apprentice
Local Hire
General Dispatch
Number
workers
needed
Report Date Report Time
TOTAL WORKERS REQUESTED =
Please have worker( s) report to the following work address indicated below:

Project Name:

Report to:

Comment or Special Instructions:

Site:

On - site Tel:

Address:

On - site Fax:

Community Workforce Agreement 34 City of Anaheim
IDate
dispatch request received:

Dispatch received by:

Classification of worker requested:

Classification of worker dispatched:

UNION USE ONLY

WORKER REFERRED
Name:

Date worker was dispatched:

Is the worker referred a: ( check all that apply)
JOURNEYMAN Yes No
APPRENTICE Yes No
LOCAL HIRE Yes No

VETERANS, DISADVANTAGED INDIVIDUALS, AND ANAHEIM

HIGH SCHOOLS GRADUATES
Yes No
GENERAL DISPATCH FROM OUT OF WORK LIST Yes No
Community Workforce Agreement 35 City of Anaheim

ATTACHMENT D

LIST OF ARBITRATORS
Mark Burstein
Fred Horowitz
Najeeb Khoury
Sara Adler
Andrea Dooley
Community Workforce Agreement 36 City of Anaheim

ATTACHMENT E

SUBSTANCE ABUSE POLICY
The Parties recognize the problems which drug and alcohol abusehave created in the construction industry and the need to develop drug and alcohol abuse prevention programs. Accordingly, the Parties agree that in order to enhance the safety of the work place and to maintain a drug and alcohol -free work environment, Contractors may require applicants or employees to undergo drug and alcohol testing.

1. It is understood that the use, possession, transfer or sale of illegal drugs, narcotics, or other unlawful substances, as well as being under the influence of alcohol and the possession or consumingalcohol is absolutelyprohibited while employeesareon the Contractor'sjob premises or while working on anyjobsite in connectionwith work performedunderthe SecondAmended and Restated Community Workforce Agreement (" CWA").

2. No Contractormay implement a drug testingprogram which doesnot conform in all respects to the provisions of this Policy.

3. No Contractormay implement drug testing at anyjobsite unlesswritten notice is given to the Union setting forth the location of the jobsite, a description of the project under construction, and the name and telephone number of the Project Work Supervisor. Said notice shall be addressedto the office of each Union signing the CWA. Said notice shall be delivered in personor by registeredmail beforethe implementationof drugtesting. Failure to give suchnotice shall make any drug testing engagedin by the Contractor a violation of the CWA, and the Contractor may not implement any form of drug testing at suchjobsite for the following six months.

4. A Contractor that elects to implement drug testing pursuant to this Agreement shall require all craft employees on the Project Work to be tested. With respect to individuals who becomeemployed on the Project Work subsequentto the proper implementationof this drug testing program, such test shall be administered upon the commencement of employment on the project, whetherby referral from aUnion DispatchOffice, transferfrom anotherproject, or another method. Individuals who were employedon theproject prior to theproper implementationof this drug testing program may only be subjected to testing for the reasons set forth in Paragraph 5(f) 1) through 5( f) ( 3) of this Policy. Refusal to undergo such testing shall be considered sufficient grounds to deny employment on the project.

The following procedure shall apply to all drug testing:
a. The Contractor may request urine samples only. The applicant or craft employee shall not be observed when the urine specimen is given. An applicant or craft employee, at his or her sole option, shall, upon request, receive a blood test in lieu of a urine test. No craft employee of the Contractor shall draw blood from a bargaining unit craft employee, touch or handle urine specimen, or in any way become involved in the chain of custody of urine or blood specimens. A Union Business Representative, subject to the approval of the individual applicant Community Workforce Agreement 37 City of Anaheim
or Contractor employee, shall be permitted to accompany the applicant or employee to the collection facility to observe the collection, bottling, and sealing of the specimen. b. Thetesting shall bedoneby a laboratoryapprovedby the SubstanceAbuse Mental Health Services Administration ( SAMHSA), which is chosen by the Contractor and the Union.

C. An initial test shall be performed using the Enzyme Multiplied Immunoassay Technique ( EMZT). In the event a question or positive result arises from the initial test, a confirmation test must be utilized before action can be taken against the applicant or employee. The confirmation test will be by Gas Chromatography Mass Spectrometry ( GC/ MS).

Cutoff levels for both the initial test and confirmation test will be those established by the SAMHSA. Should these SAMHSA levels be changed during the course of this agreement or new testingproceduresareapproved, thenthesenewregulationswill bedeemedaspart of this existing agreement. Confirmedpositive sampleswill beretainedby thetesting laboratoryin securedlong- term frozen storage for a minimum of one year. Handling and transportation of each sample must be documented through strict chain of custody procedures. d. In the event of a confirmed positive test result the applicant or craft employee may request, within forty- eight ( 48) hours, a sample of their specimen from the testing laboratoryfor purposesof a secondtestto beperformedat a secondlaboratory, designatedby the Union and approved by SAMHSA. The retest must be performed within ten ( 10) days of the request. Chain of custody for this sample shall be maintained by the Contractor between the original testing laboratory and the Union' s designated laboratory. Retesting shall be performed at the applicant' s or craft employee' s expense. In the event of conflicting test results the Contractor may require a third test.
e. If, as a result of the above testing procedure, it is determined that an applicant or craft employee has tested positive, this shall be considered sufficient grounds to deny the applicant or craft employee their employment on the Project Work. f. No individual who tests negative for drugs or alcohol pursuant to the above procedureand becomesemployedon the Project Work shall again be subjectedto drug testing with the following exceptions:

1. Craft employees who are involved in industrial accidents resulting in damageto plant, property or equipmentor injury to him/herself or othersmaybetestedpursuant to the procedures stated hereinabove.

2. The Contractor may test employees following thirty ( 30) days advance written notice to the craft employee( s) to be tested and to the applicable Union. Notice to the applicable Union shall be as set forth in Paragraph 3 above and such testing shall be pursuant to the procedures stated hereinabove.

3. The Contractor may test a craft employee where the Contractor has reasonable cause to believe that the craft employee is impaired from performing their job.

Community Workforce Agreement 38 City of Anaheim
Reasonable cause shall be defined as exhibiting aberrant or unusual behavior, the type of which is a recognized and accepted symptom of impairment ( i. e., slurred speech, unusual lack of muscular coordination, etc.). Such behavior must be actually observed by at least two persons, one of whom shall be a Supervisor who has been trained to recognize the symptoms of drug abuse or impairment and the other of whom shall be the job steward. If the job steward is unavailable or there is no job stewardon the project the other personshall be a memberof the applicableUnion' s bargaining unit. Testing shall be pursuant to the procedures stated hereinabove. Craft employees who are testedpursuantto the exceptionssetforth in this paragraphandwho testpositive will beremoved from the Contractor' s payroll.
g. Applicants or craft employees who do not test positive shall be paid for all time lost while undergoing drug testing. Payment shall be at the applicable wage and benefit rates set forth in the applicable Union' s Master Labor Agreement. Applicants who have been dispatched from the Union and who are not put to work pending the results of a test will be paid waiting time until suchtime asthey areput to work. It is understoodthat an applicantmust passthe test as a condition of employment. Applicants who are put to work pending the results of a test will be considered probationary employees.

6. The Contractor will be allowed to conduct periodic job site drug testing on the Project under the following conditions:
a. The entire jobsite must be tested, including any craft employee or subcontractor' s craft employee who worked on that project three ( 3) working days before or after the date of the test;
b. Jobsite testing cannot continence sooner than thirty ( 30) days after start of the work on the Project;
C. Prior to start of periodic testing, a business representative will be allowed to conduct an educational period on company time to explain periodic jobsite testing program to affected craft employees;
d. Testing shall be conducted by a SAMHSA certified laboratory, pursuant to the provisions set forth in Paragraph 5 hereinabove.

Only two periodic testsmay beperformed in atwelve-month period.

7. It is understood that the unsafe use of prescribed medication, or where the use of prescribedmedicationimpairsthe employee'sability to perform work, is a basisfor theContractor to remove the craft employee from the jobsite.

8. Any grievance or dispute which may arise out of the application of this Agreement shall be subject to the grievance and arbitration procedures set forth in the CWA.

9. The establishment or operation of this Policy shall not curtail any right of any craft employee found in any law, rule or regulation. Should any part of this Agreement be found Community Workforce Agreement 39 City of Anaheim
unlawful by a court of competent jurisdiction or a public agency having jurisdiction over the parties, the remaining portions of the Agreement shall be unaffected, and the parties shall enter negotiations to replace the affected provision.

10. Present craft employees, if tested positive, shall have the prerogative for rehabilitation programat the craft employee'sexpense. When suchprogramhasbeensuccessfully completed the Contractor shall not discriminate in any way against the craft employee. If work for which the craft employee is qualified exists, he/she shall be reinstated.

11. The Contractor agreesthat results of urine and blood tests performed hereunder will be considered medical records held confidential to the extent permitted or required by law. Such records shall not be released to any persons or entities other than designated Contractor representatives and the applicable Union. Such release to the applicable Union shall only be allowed upon the signing of a written release and the information contained therein shall not be used to discourage the employment of the individual applicant or craft employee on any subsequent occasion.

12. The Contractor shall indemnify and hold the City of Anaheim and Union harmless againstany andall claims, demands, suits, or liabilities thatmay ariseout of the applicationof this AttachmentE and/or anyprogrampermitted hereunder.

13. Craft employees who seek voluntary assistance for substance abuse may not be disciplined for seekingsuchassistance. Requestsfrom craft employeesfor suchassistanceshall remain confidential and shall not be revealed to other employees or management personnel without the employee' s consent. Craft employees enrolled in substance abuseprograms shall be subject to all Contractor rules, regulations and job performance standards with the understanding that an employee enrolled in such a program is receiving treatment for an illness.

14. This policy shall constitute the only Agreement in effect between the parties concerning drug and alcohol abuse, prevention and testing. Any modifications thereto must be accomplished pursuantto collective bargaining negotiationsbetweenthe parties.

Community Workforce Agreement 40 City of Anaheim

DRUG ABUSE PREVENTION AND DETECTION

APPENDIX A

CUTOFF LEVELS

SCREENING SCREENING CONFIRMATION CONFIRMATION
DRUG METHOD LEVEL ** METHOD LEVEL
Alcohol EMIT 0. 02% CG/ MS 0. 02%
Amphetamines EMIT 1000 ng/m* CG/ MS 500 ng/ml*
Barbiturates EMIT 300 ng/ml CG/ MS 200 ng/ml
Benzodiazepines EMIT 300 ng/ml CG/ MS 300 ng/ml
Cocaine EMIT 300 ng/ml* CG/ MS 150 ng/ml*
Methadone EMIT 300 ng/ml CG/ MS 100 ng/ml
Methaqualone EMIT 300 ng/ml CG/ MS 300 ng/ml
Opiates EMIT 2000 ng/ml* CG/ MS 2000 ng/ml*
PCP ( Phencyclidine) EMIT 25 ng/ml* CG/ MS 25 ng/ml*
THC ( Marijuana) EMIT 50 ng/ml* CG/ MS 15 ng/ml*
Propoxyphene EMIT 300 ng/ml CG/ MS 100 ng/ml
SAMHSA specified threshold
A samplereportedpositive containsthe Indicateddrug at or abovethe cutoff level for that drug. A negative sample either contains no drug or contains a drug below the cutoff level.

EMIT - Enzyme Immunoassay
CC/ MS - Gas Chromatography/ Mass Spectrometry
Community Workforce Agreement 41 City of Anaheim

SIDE LETTER OF AGREEMENT

TESTING POLICY FOR DRUG ABUSE
It is hereby agreed between the Unions and Contractors hereto that a Contractor who has otherwise properly implementeddrug testing, as set forth in the Testing Policy for Drug Abuse, shall have the right to offer an applicant or craft employee a "quick" drug screening test. This " quick" screen test shall consist either of the " ICUP" urine screen or similar test or an oral screen test. The applicant or craft employee shall have the absolute right to select either of the two " quick" screen tests, or to reject both and request a full drug test.

An applicant or craft employee who selects one of the quick screen tests, and who passesthe test, shallbeput to work immediately. An applicantor craft employeewho fails the "quick" screentest, or who rejects the quick screen tests, shall be tested pursuant to the procedures set forth in the Testing Policy for Drug Abuse. The sample used for the " quick" screen test shall be discarded immediately upon conclusion of the test. An applicant or craft employee shall not be deprived of any rights granted to them by the Testing Policy for Drug Abuse as a result of any occurrence related to the " quick" screen test.