A G R E E M E N T
THIS AGREEMENT, dated for purposes of identification only this _____ day of __________, 2026 is made and entered into by and between the

CITY OF ANAHEIM, a municipal corporation,
hereinafter referred to as "ANAHEIM,"
A
N
D

ITERIS, Inc., a Delaware corporation,
hereinafter referred to as "CONSULTANT."

ANAHEIM and CONSULTANT are sometimes individually referred to herein as "Party" and collectively as "Parties."
W I T N E S S E T H:

WHEREAS, ANAHEIM is a municipal corporation duly o rganized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of the City of Anaheim; and
WHEREAS ANAHEIM desires to engage CONSULTANT to provide traffic and intelligent transportation systems engineering services, including but not lim ited to project management, data collection and field review, system design and construction support, signal timing and optimization, primary implementation reports, and operations and maintenance support for the State College Boulevard / The City Drive Reg ional Traffic Signal Synchronization Program (TSSP) Project (the “Project”); and WHEREAS, CONSULTANT possesses the skill, experience, ability, background, certification and knowledge to provide the services for the Project as described in this Agreement; and
WHEREAS, ANAHEIM has solicite d and received a proposal from CONSULTANT dated March 26, 2026 ("Proposal"), has reviewed the previous experience and evaluated the expertise of CONSULTANT, and desires to retain CONSULTANT to render professional services under the terms and conditions set forth in this Agreement.

NOW, THEREFORE, FOR AND IN CONSIDERATION OF THE MUTUAL

PROMISES, COVENANTS AND CONDITIONS HEREIN CONTAINED, THE PARTIES HERETO AGREE AS FOLLOWS:

2 1. SERVICES TO BE PROVIDED BY CONSULTANT
In compliance with all of the terms and c onditions of this Agreement, CONSULTANT shall provide to ANAHEIM all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional consulting services necessary for the Project (“S ervices”). The Services are more particularly described in Exhibit A, attached hereto and incorporated herein by this reference (“Sco pe of Services”). The ANAHEIM Director of Public Works (“Director”) may elect to delete certain tasks from the Scope of Services in its sole discretion In the event of conflicting provisions, the provisions shall govern in the following order: (1) this Agreement; (2) CONSULTANT's Proposal.

2. TERM
The term of this Agreement shall commence on the date this Agreement is executed by ANAHEIM, and shall terminate upon completion of the Services, unless terminated sooner as provided herein.

3. TIME OF PERFORMANCE

3.1 Time is of the essence in the performance of th is Agreement and the Services shall be performed to completion in a reasonably diligent and timely manner. The failure by CONSULTANT to perform the Services in a diligent and timely manner may result in termination of this Agreement by ANAHEIM.

3.2 The time period(s) specified for performance of the Services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of CONSULTANT, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, f ires, earthquakes, floods, pestilence, and other natural catastrophes, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, civil disturbance or disobedience, sabotage, restraint by court order or public authority and ac tion or non-action by or inability to obtain the necessary authorization or approvals from any governmental agency or authority, and/or acts of any governmental agency, including ANAHEIM, which by the exercise of due diligence such Party could not reasonab ly have been expected to avoid and which by exercise of due diligence has been unable to overcome, if CONSULTANT shall within ten (10) days of the commencement of such delay notify the Project Administrator in writing of the causes of the delay. The Proje ct Administrator shall ascertain the facts and the extent of delay, and may extend the time for performing the Services for the period of the enforced delay if, in the judgment of the Project Administrator, such delay is justified. The Project Administrat or's determination shall be final and conclusive upon the Parties to this Agreement. In the event of delay, however caused, CONSULTANT's sole remedy shall be an extension of th is Agreement pursuant to this Section and CONSULTANT shall not be entitled to recover damages against ANAHEIM.

3 4. COMPENSATION

4.1 ANAHEIM shall pay CONSULTANT for the Services satisfactorily rendered, pursuant to this Agreement, in the amount not to exceed Nine Hundred, Ninety-Five Thousand, Seven Hundred Eighty Four Dollars ($995,784.00) (“Contract Amount”) pursuant to the fee proposa l set forth in Exhibit A and incorporated herein by reference . CONSULTANT and ANAHEIM agree that no changes to the fee proposal set forth in Exhibit A shall be made during the term of this Agreement without the prior written approval of ANAHEIM.

4.2 No Extra Work shall be rendered b y CONSULTANT, unless such Extra Work is first approved by written amendment to this Agreemen t. As used herein, "Extra Work" means any work that is determined by ANAHEIM to be necessa ry for the proper completion of the Services, but which is not included within the Scope of Ser vices and which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Compensation for any authorized Extra Work billed on a time and expense ba sis shall be paid in accordance with billing rates set forth in the Proposal.

4.3. CONSULTANT shall submit monthly invoices to ANAHEIM describing the work performed the preceding month. CONSULTANT’s bills shall include the name of the person who performed the work, a brief description of the Services performed and/or the specific task in the Scope of Services to which it relates, the date the Services were performed, the number of hours spent on all work billed on an hourly basis, and a description of any reimbursable expenditures. ANAHEIM shall pay CONSULTANT no later than thirty (30) days after approval of the monthly invoice by ANAHEIM staff.

4.4 All Parties recognize that the continuation of this Agreement after the close of any fiscal year of ANAHEIM, which fiscal year ends on June 30 of each year, shall be subject to budget approval provid ing for or covering such contract items as an expenditure in said budget. ANAHEIM does not represent that said budget item will be actually adopted, said determination being the determination of the City Council at the time of the adoption of the budget h erein. No penalty shall accrue to ANAHEIM in the event this provision shall be exercised. Should termination be accomplished in accordance with this Section, a settlement shall be negotiated by the Parties based on items delivered, services provided, mon ies paid and monies due

4.5 CONSULTANT shall submit monthly invoices to ANAHEIM describing the work performed the preceding month. CONSULTANT's bills shall include the name of the person who performed the work, a brief description of the Services performed and/or the specific task in the Scope of Services to which it relates, the date the Services were performed, the number of hours spent on all work billed on an hourly basis, and a description of any reimbursable expenditures. ANAHEIM shall pay CONSULTANT no later than thirty (30) days after approval of the monthly invoice by ANAHEIM staff.

4 5. PROJECT MANAGER

5.1 CONSULTANT shall designate a Project Manager, who shall coordinate the Services. This Project Manager shall be available to ANAHEIM at all rea sonable times during the Term of this Agreement. It is expressly understood that the experience, knowledge, capability and reputation of the Project Manager is a substantial inducement for ANAHEIM to enter into this Agreement. Therefore, the Project Mange r shall be responsible during the Term of this Agreement for directing all activities of CONSULTANT and devoting sufficient time to personally supervise the provision of Services hereunder. The Project Manager may not be changed by CONSULTANT and no other personnel may be assigned to supervise the Services to be provided hereunder without the express written consent of ANAHEIM.

5.2 Any personnel or sub consultant, if any, who fail or refuse to perform the Services in a manner acceptable to ANAHEIM, or who are determined by ANAHEIM, in its sole discretion, to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, or a threat to the safety of persons or property, shall be promptly removed from the Project by CONSULTANT at the request of ANAHEIM. CONSULTANT warrants that it will continuously furnish the necessary personnel to complete the Services on a timely basis as contemplated by this Agreement.

6. ADMINISTRATION
This Agreement will be administered by the Public Works Department. The employees of the Public Works Department shall be authorized to take the following actions pursuant to this Agreement:
(i) The Director of Public Works is authorized to take any and all actions on behalf of ANAHEIM as set forth herein and to terminate services in accordance with Section 25 of this Agreement.
(ii) The Contract Administrator is authorized to take those specific acti ons set forth herein and review and approve all Services performed by CONSULTANT under this Agreement, includi ng any revisions to billing rates as further described in Section 4.5 above .

The Contract Administrator shall not be authorized to terminate Services under this Agreement.

7. STANDARD OF CARE

7.1 CONSULTANT shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. CONSULTANT represents and maintains that it is skilled in the professional calling necessary to perform the Services. CONSULTANT warrants that all employees and subconsultants, if any, shall have sufficient skill and experience to perform the Services assigned to them. By delivery of completed work, CONSULTANT certifies that the work conforms to the requirements of this Agreement; all applicable federal, state and local laws; and the professional standard of care.

7.2 CONSULTANT represents and warrants to ANAHEIM that it has, shall obtain, and shall keep in full force in effect durin g the term hereof, at its sole cost and expense,

5 all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of CONSULTANT to practice its profession. CONSULTANT shall maintain a City of Anaheim business license during the term of this Agreement.

8. FAMILIARITY WITH WORK
By executing this Agreement, CONSULTANT represents and warrants that CONSULTANT: (i) has thoroughly investigated and considered the Services to be performed; (ii) has carefully considered how the Services should be provided; and (iii) fully understands the facilities, difficulties and restrictions attending the provision of the Services under this Agreement. Should CONSULTANT discover any latent or unknown conditions materially differing from those inherent in the provision of such Services or as represented by ANAHEIM, CONSULTANT shall immediately inform ANAHEIM of such fact and shall not proceed except at CONSULTANT's risk until written instructions are received from ANAHEIM.

9. INDEPENDENT CONTRACTOR

9.1 Neither ANAHEIM nor any of its employees shall have any control over the manner, mode or means by which CONSULTANT, its agents or employees, perform the services required herein, except as otherwise set forth herein. Except as expressly pr ovided herein, ANAHEIM shall have no voice in the selection, discharge, supervision or control of CONSULTANT's employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. CONSULTANT shall perform all service s required herein as an independent CONSULTANT of ANAHEIM and shall remain at all times as to ANAHEIM a wholly independent contractor with only such obligations as are consistent with that role.

CONSULTANT shall not at any time or in any manner represent t hat it or any of its agents or employees are agents or employees of ANAHEIM. ANAHEIM shall not in any way or for any purpose become or be deemed to be a partner of CONSULTANT in its business or otherwise or a joint venture or a member of any joint enterprise with CONSULTANT.

9.2 In consideration for the compensation paid to CONSULTANT by ANAHEIM, CONSULTANT agrees that ANAHEIM shall not be liable or responsible for any benefits, including, but not limited to, worker's compensation, disability, retirement, l ife, unemployment, health or any other benefits and CONSULTANT agrees that it shall not sue or file a claim, petition or application therefor e against ANAHEIM or any of its officers, employees, agents, representatives or sureties.

10. INSURANCE
Without limiting ANAHEIM’S right to indemnification, it is agreed that CONSULTANT shall secure, prior to commencing any activities under this Agreement, and maintain, during the term of this Agreement, minimum limits of insurance coverage as follows:

Workers’ Compensation Insurance as required by California law and Employers Liability Insurance in an amount not less than $1,000,000. This coverage requires a Waiver of Subrogation Endorsement.

6 Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual Liability, Personal Injury Liability, Products/Completed Operations Liability, as well as Independent CONSULTANT’S Liability where appropriate, in an amount not less than $2,000,000 per occurrence, $4,000,000 annual aggregate. Such insurance shall be written on a primary basis but may include a deductible or self-insured retention of more than $10,000 per occurrence, provided that such deductible or self-insured retention is disclosed to ANAHEIM, in writing, prior to the inception of this Agreement. This coverage requires a Waiver of Subrogation Endorsement.

Commercial Automobile Liability Coverage as required by California law, including— as applicable—owned, non-owned, and hired autos, in an amount not less than $2,000,000 per occurrence, combined single limit. This coverage requires a Waiver of Subrogation Endorsement.

Professional Liability Insurance, inclusive of Cyber Liability Insurance (where required) in an amount not less than $2,000,000. Such insurance shall be written on a primary basis but may include a deductible or self-insured retention of more than $10,000 per occurrence, provided that such deductible or self-insured retention is disclosed to ANAHEIM, in writing, at the inception of this Agreement.

Any required coverage written with primary and excess layers to satisfy the minimum requirements of this Agreement must be submitted for approval by ANAHEIM’s Risk Manager prior to the inception of the final Agreement.

CONSULTANT is responsible for the satisfaction of any applicable deductible or self- insured retention obligation.

CONSULTANT agrees that this insurance shall not be voluntarily cancelled by CONSULTANT or limited in scope or coverage by CONSULTANT until after thirty (30) days prior written notice has been given to the City Clerk, City of Anaheim, 200 S. Anaheim Blvd., Anaheim, CA 92805. This does not apply to cancellation for non-payment of premium, which requires notice of not less than ten (10) days.

Each insurance policy required by this Agreement, except policies for Professional Liability and Workers’ Compensation, shall contain the following clauses or shall otherwise provide for the following conditions:

“It is agreed that any insurance maintained by CONSULTANT pursuant to this Agreement shall be primary to, and not contribute with, any insurance or self- insurance maintained by the City of Anaheim.”

“The City of Anaheim, its officers, agents, employees, representatives and volunteers are included as additional insured with respect to the scope of work, operations, and/or activities of or performed on behalf of or at the direction of the Named Insured, performed under this Agreement with the City of Anaheim.”

7 Prior to commencing any work u nder this Agreement, CONSULTANT shall deliver to ANAHEIM insurance certificates confirming the existence of the insurance required under this Agreement, and including the applicable clauses referenced above. Also, within thirty (30) days of the executio n date of this Agreement, CONSULTANT shall provide ANAHEIM (i) endorsements to the insurance policies that add to these policies the applicable clauses referenced above, or (ii) in lieu of said endorsements, documentation acceptable to ANAHEIM evidencing that the coverage, terms, and conditions set forth in the above -referenced clauses are otherwise included in said insurance policies. Insurance required hereunder shall be placed with insurers (i) admitted to write insurance in California, (ii) possessing an A. M. Best’s rating of A VII or higher, or (iii) otherwise acceptable to ANAHEIM, with prior written permission from ANAHEIM. In the event that a claim or other legal action is filed against ANAHEIM, and if ANAHEIM, in its good faith opini on, believes it may have coverage under any of the insurance required herein, then ANAHEIM has the right to demand, and to receive within a reasonable time period, copies of the insurance policies related to such required insurance; provided, however, that this provision shall not apply if the parties agree that CONSULTANT shall fully defend, hold harmless, and indemnify ANAHEIM against any such claim or other legal action.

In addition to other remedies ANAHEIM may have if CONSULTANT fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time required, ANAHEIM may, at its sole option:

Order CONSULTANT to stop work under this Agreement and/or withhold any payment(s) that become due to CONSULTANT hereunder until CONSULTANT demonstrates compliance with the requirements hereof.

Terminate this Agreement.

Exercise of any of the above remedies, however, is an alternative to other remedies ANAHEIM may have and is not the exclusive remedy for CONSULTANT ’S failure to maintain insurance or secure appropriate endorsements.

Nothing herein contained shall be construed in any way as limiting the extent that an CONSULTANT may be held responsible for payments of damages to persons or property resulting from CONSULTANT’S, (or CONSULTANT’S AGENT or SUB -AGENT, if any) performance of the work covered under this Agreement.

In the event CONSULTANT hires other persons or firms to perform some of the work related to this Agreement, CONSULTANT shall ensure (i ) that the acts or omissions of such persons or firms are covered under the above -referenced liability insurance, or (ii) that such firms maintain insurance equal to or better than, and subject to the same limits, terms and conditions as, the insurance req uired of CONSULTANT under this Agreement (except for firms that are not performing professional services —such firms shall not be required to carry the above-referenced professional liability insurance); and in either instance, CONSULTANT shall provide, or cause to be provided, evidence of such insurance coverage, reasonably acceptable to

8 ANAHEIM.

ANAHEIM’S Risk Manager is hereby authorized to amend or reduce the requirements set forth herein if such CONSULTANT generated amendment or reduction request is in ANAHEIM’S best interest.

11. INDEMNIFICATION
As respects acts, errors or omissions in the performance of professional services, CONSULTANT agrees to indemnify and hold harmless ANAHEIM, its officials, officers, and employees from and against any and all c laims, losses, damages, defense costs, or liability, of any kind or nature, to the extent caused by or directly arising out of the negligent acts, errors or omissions of the CONSULTANT or any SUB -AGENT in the performance of professional services under this Agreement.

As respects a ll acts, errors or omissions that do not arise directly out of the performance of professional services, including but not limited to those acts, errors or omissions typically covered by general and automobile liability insurance, CONSU LTANT agrees to indemnify, defend (at ANAHEIM'S option), and hold harmless ANAHEIM, its officials, officers, employees, agents, and representatives from and against any and all claims, losses, damages, defense costs, or liability, of any kind or n ature (collectively referred to hereinafter as “Claims”), arising out of or in connection with CONSULTANT’S (or CONSULTANT'S AGENT or SUB -AGENT, if any) acts, errors, omissions, or work, relative to this Agreement; except for those Claims that arise out of the sole negligence or willful misconduct of ANAHEIM.

The obligations set forth in this indemnification provision (i) shall be in effect without regard to whether or not ANAHEIM, CONSULTANT, or any other person maintains or fails to maintain, insurance co verage, or a self -insurance program, for any such Claims; and (ii) shall survive the termination of this Agreement.

12. PREVAILING WAGES
Where required pursuant to the provisions of the State of California Labor Code or the Davis Bacon Act, not less than t he general prevailing rate of per diem wages including legal holidays, and overtime work for each craft or type of workman needed to execute the work contemplated under this Agreement, shall be paid to all workmen employed on the work to be done according to this contract by CONSULTANT or any approved Subcontractor, and shall be deemed to include employer payments for health and welfare, pension, vacation and similar purposes. If both the Davis -Bacon Act and State of California prevailing wage laws apply a nd the federal and state prevailing rate of per diem wages differ, CONSULTANT and Subcontractor, if any, shall pay the higher of the two rates. Said prevailing rate of per diem wages are on file at the City of Anaheim, Office of the City Clerk, 200 South Anaheim Boulevard, Anaheim, California 92805, and are available to any interested party on request.

9 13. PROGRESS
CONSULTANT is responsible for keeping the Project Administrator and/or his/her duly authorized designee informed on a regular basis regarding t he status and progress of the Services, activities performed and planned, and any meetings that have been scheduled or are desired.

14. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
The Parties recognize that a substantial inducement to ANAHEIM for enterin g into this Agreement is the professional reputation, experience and competence of CONSULTANT. Neither the whole nor any interest in, nor any of the rights or privileges granted under this Agreement shall be assigned, transferred or encumbered in any way without the prior written consent of ANAHEIM. Any such purported assignment, transfer, encumbrance, pledge, subuse, or permission given without such consent shall be void as to ANAHEIM. If ANAHEIM approves an assignment or transfer, this Agreement and the covenants and conditions contained herein shall be binding upon and inure to the benefit of and shall apply to the permitted successors and assigns of CONSULTANT.

15. SUBCONTRACTING
Except for those subcontractors set forth in the Scope of Services, if a ny, CONSULTANT shall not subcontract any portion of the work to be performed under this Agreement without the prior written authorization of ANAHEIM. CONSULTANT shall be fully responsible to ANAHEIM for all acts and omissions of any approved subcontractor . Nothing in this Agreement shall create any contractual relationship between ANAHEIM and subcontractor nor shall it create any obligation on the part of ANAHEIM to pay or to see to the payment of any monies due to any such subcontractor other than as oth erwise required by law. ANAHEIM is an intended beneficiary of any work performed by any subcontractor for purposes of establishing a duty of care between the subcontractor and ANAHEIM pursuant to this Agreement.

16. USE AND OWNERSHIP OF DOCUMENTS AND DATA

16.1 ANAHEIM shall furnish to CONSULTANT such documents and materials as may be relevant and pertinent to the provision of services hereunder as ANAHEIM may possess or acquire.

16.2 All documents and materials furnished by ANAHEIM to CONSULTANT pursuant to Section 16.1 shall remain the property of ANAHEIM and shall be returned to ANAHEIM upon termination of this Agreement, for any reason. All documents or material prepared or caused to be prepared by CONSULTANT, its officers, employees, agents and subcontractors, in the course of implementing this Agreement, shall become the exclusive property of ANAHEIM, and ANAHEIM shall have the sole right to use such materials in its discretion without further compensation to CONSULTANT or any other party. CONSULTANT shall, at CONSULTANT's sole cost and expense, provide such documents and material to ANAHEIM upon prior written request.

10 Documents and material prepared by CONSULTANT pursuant to this Agreement are not intended or represented to be suitable for reuse by ANAHEIM or others on any other project. Any use of completed documents for other projects and any use of incomplete documents without specific written authorization from CONSULTANT will be at ANAHEIM's sole risk and without liability to CONSULTANT. Furt her, any and all liability arising out of changes made to CONSULTANT's deliverables under this Agreement by ANAHEIM or persons other than CONSULTANT, is waived against CONSULTANT and ANAHEIM assumes full responsibility for such changes unless ANAHEIM has g iven CONSULTANT prior notice and has received from CONSULTANT written consent for such changes.

17. CONFIDENTIALITY

17.1 “Confidential Information” means, with respect to a Party hereto, all information or material which either (1) is marked or identifie d as “Confidential,” “Restricted,” or “Proprietary Information” or other similar marking or identification, or (2) the other Party knew, as recipient, or under the circumstances, should have known, was considered confidential or proprietary by the Disclosi ng Party (as defined below). Confidential Information shall consist of all information, whether in written, oral, electronic, or other form, furnished in connection with this Agreement by the Disclosing Party or its Representatives (“Representative” is d efined as any elected and appointed officials, affiliate, director, officer, employee, agent, advisor or CONSULTANT of a Party or any of its subsidiaries or affiliates) to the Receiving Party (as defined below) or to its Representatives, and specifically i ncludes but is not limited to ANAHEIM’s individually identifiable customer information, and ANAHEIM’s customer usage data and financial data.

17.2 CONSULTANT and ANAHEIM shall each hold the other’s Confidential Information in confidence. Neither Party sh all make the other’s Confidential Information available in any form to any third party or use the other’s Confidential Information for any purpose other than as specified in this Agreement. The Party providing Confidential Information (“Disclosing Party”) to the other Party (“Receiving Party”) shall remain the sole owner of such information. Except as provided elsewhere within this Agreement, nothing contained in this Agreement shall be construed as granting or conferring any right or license in any Confid ential Information or in any patents, copyrights, software or other technology, either expressly or by implication to the Receiving Party, or to its Representatives or to others. The term Confidential Information shall not include any of the following: (1) information already in possession of, or already known to, the Receiving Party as of the Effective Date without an obligation of confidentiality; (2) information in the public domain at the time of the disclosure, or which, after such disclosure, enters i nto the public domain through no breach of this Agreement by the Receiving Party or its Representative(s); (3) information lawfully furnished or disclosed to the Receiving Party by a non -party to this Agreement without any obligation of confidentiality and through no breach of this Agreement by the Receiving Party or its Representative(s); (4) information independently developed by the Receiving Party without use of any Confidential Information of the Disclosing Party; or (5) information authorized in writi ng by the Disclosing Party to be released from the confidentiality obligations herein.

17.3 By virtue of this Agreement, each Party hereto may disclose to the other Party information that is Confidential Information. This Agreement does not diminish, revok e or

11 supersede any existing confidentiality, non -disclosure or similar agreement between the Parties that does not pertain to the subject matter of this Agreement. However, any Confidential Information, whether or not previously disclosed, that pertains t o the subject matter of this Agreement shall be governed by the terms of this Section 17 which shall supersede any such previous agreement with respect to such Confidential Information and any Confidential Information relating to the subject matter of this Agreement that was exchanged under such previous agreement it shall be treated as though it was exchanged under this Agreement as of the date of such exchange.

17.4 The Receiving Party will treat all Confidential Information of the Disclosing Party, no matter written, electronic, or oral, as confidential and proprietary, and the Receiving Party shall only use such information in furtherance of this Agreement. As such, the Receiving Party shall hold in confidence the Confidential Information of the Disclo sing Party, and ensure that such Confidential Information is not disclosed to any other person or entity, except as expressly permitted by this Agreement or as authorized in writing by the Disclosing Party. Receiving Party shall not disclose Confidential Information of the Disclosing Party received under this Agreement to any person other than its Representatives who require knowledge of such Confidential Information in furtherance of this Agreement. The Receiving Party shall inform its Representatives of the confidential nature of the Confidential Information of the Disclosing Party and advise such Representatives of the limitations on the use and disclosure and prohibition on making copies or summaries of such Confidential Information. The Receiving Party shall be responsible for any breach of this Agreement by its Representatives.

Neither Party shall use the Confidential Information of the other Party for any commercial purpose.

17.5 If the Receiving Party becomes legally compelled (by oral questions, interrogatories, request for information or documents, subpoena, civil investigative demand, or similar process) to disclose any Confidential Information of the Disclosing Party or is requested Confidential Information pursuant to the California Public Record s Act or similar law, the Receiving Party will provide the Disclosing Party with written notice of such an occurrence (if so permitted) as soon as possible. Thereafter, at its sole costs and expense, the Disclosing Party may seek a protective order or othe r appropriate remedy, or waive compliance with the provisions of this Agreement. So long as it is consistent with applicable law, the Receiving Party will not oppose action by, and the Receiving Party will cooperate with, the Disclosing Party, at the Disclosing Party’s sole cost and expense, to obtain an appropriate protective order or other reliable assurance that confidential treatment will be accorded the Confidential Information. If the Disclosing Party fails to obtain such protective order or other rem edy, or if the Disclosing Party waives compliance with the requirements of the preceding sentence, the Receiving Party will disclose only that Confidential Information that it is legally required to disclose, and will exercise commercially reasonable effor ts, at Disclosing Party’s expense, to obtain reliable assurance that confidential treatment will be accorded the Confidential Information so disclosed.

17.6 In the event the Receiving Party discloses, disseminates or releases any Confidential Information, except as expressly permitted by this Agreement, such disclosure, dissemination or release will be deemed a material breach of this Agreement and the Disclosing Party may demand prompt return of all Confidential Information previously provided to the Receiving Party. As soon as the Receiving Party becomes aware that it has made an

12 unauthorized disclosure of Confidential Information, the Receiving Party shall take any and all necessary actions to recover the improperly disclosed Confidential Information an d immediately notify Disclosing Party regarding the nature of the unauthorized disclosure and the corrective measures being taken. Each Party agrees that any breach of their confidentiality obligations could cause irreparable harm to the other Party, the amount of which would be extremely difficult to estimate. Accordingly, it is understood and agreed that monetary damages would not be a sufficient remedy for any material breach of this Agreement and that specific performance and injunctive relief in addi tion to monetary damages shall be appropriate remedies for any breach or any threat of such breach. The provisions of this Paragraph are in addition to any other legal rights or remedies the Disclosing Party may have.

17.7 Within two (2) weeks of the term ination of this Agreement, CONSULTANT will return to ANAHEIM or destroy, to the extent permitted by law, any and all Confidential Information, including all originals, copies, translations, transcriptions or any other form of material, without retaining an y copy or duplicate thereof; provided that CONSULTANT may retain Confidential Information contained on backup media created in the ordinary course of business provided further that there is no effort to access such Confidential Information and CONSULTANT’s confidential obligations with respect to such information shall continue so long as such information is retained. CONSULTANT shall certify in writing the destruction of the Confidential Information. ANAHEIM may perform an audit of CONSULTANT’s records to confirm the return or destruction of the Confidential Information. ANAHEIM shall have this audit right for three (3) years after the termination of this Agreement.

17.8 Notwithstanding the termination of this Agreement, this Confidentiality Section shall survive the expiration or earlier termination of this Agreement.

18. INTELLECTUAL PROPERTY INDEMNITY
CONSULTANT shall defend and indemnify ANAHEIM, its agents, officers, representatives and employees against any and all liability, including costs, for in fringement of any United States' letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by CONSULTANT to ANAHEIM pursuant to this Agreement.

19. RECORDS
CONSULTANT shall keep records and invoices in connection with the work to be performed under this Agreement. CONSULTANT shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures and disbursements charged to ANAHEIM, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to CONSULTANT under this Agreement. All such records and invoices shall be clearly identifiable. CONSULTANT shall allow a representative of ANAHEIM to examine, audit and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. CONSULTANT shall allow inspection of all work, data, Documents, proceedings and activities related to this Agreement for a period of three (3) years from the date of final payment to CONSULTANT under this Agreement.

13 20. WITHHOLDINGS
ANAHEIM may withhold payment to CONSULTANT of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. CONSULTANT shall not discontinue work as a result of such withholding. CONSULTANT shall have an immediate right to appeal to the City Manager or his Designee with respect to such disputed sums and his/her decision shall be final. CONSULTANT shall be entitled to receive interest on any withheld sums at the rate of return that ANAHEIM earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld.

21. ERRORS AND OMISSIONS
In the event of errors or omissions that are due to the negligence or professional inexperience of CONSULTANT which result in expense to ANAHEIM gr eater than what would have resulted if there were not errors or omissions in the work accomplished by CONSULTANT, the additional cost and expense shall be borne by CONSULTANT. Nothing in this paragraph is intended to limit ANAHEIM's rights under the law or any other sections of this Agreement.

22. ANAHEIM'S RIGHT TO EMPLOY OTHER CONTRACTORS
CONSULTANT acknowledges and agrees that this Agreement and the provision of services hereunder are nonexclusive and that ANAHEIM may enter into similar agreements with other entities for the provision of similar services.

23. CONFLICTS OF INTEREST
CONSULTANT or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the “ Act”), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the Services performed under this Agreement and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. If subject to t he Act, CONSULTANT shall conform to all other requirements of the Act that may be applicable.

Failure to do so constitutes a material breach and is grounds for immediate terminat ion of this Agreement by ANAHEIM.

CONSULTANT’s Services under this Agreement may now or in the future involve participation in governmental decision -making processes such that ANAHEIM deems it necessary to designate one or more of CONSULTANT’s employees a filer of a Statement of Economic Interests (“Form 700 Filer”) under the Act. ANAHEIM shall make such designations based on the nature and scope of the Services and requirements of the Act. If CONSULTANT’s employee(s) is designated a Form 700 Filer, such employee(s) shall file under Disclosure Category 1, unle ss otherwise directed b y ANAHEIM , and shall periodically complete ethics training as required by ANAHEIM . CONSULTANT shall at its own cost and expense ensure such employee’s compliance with these filing and ethics-training requirements.

14 CONSULTANT shall ind emnify and hold harml ess ANAHEIM for any and all claims for damages resulting from CONSULTANT’s violation of this Section.

24. NOTICES
All notices, demands or other writings to be made, given or sent hereunder, or which may be so given or made or sent by either ANAHEIM or CONSULTANT to the other shall be deemed to have been given when in writing and personally delivered or if mailed on the third (3rd) day after being deposited in the United States mail, certified or registered, postage prepaid, and addressed to the respective Parties at the following addresses:

If to ANAHEIM: City Clerk
City of Anaheim
200 S. Anaheim Boulevard, 2nd Floor
Anaheim, California 92805
FAX No. (714) 765-4105

With copies to: Public Works Department
City of Anaheim
200 S. Anaheim Boulevard, 2nd Floor
Anaheim, California 92805
FAX No. (714) 765-5225

To CONSULTANT: Iteris, Inc.
1700 Carnegie Avenue, Suite 100
Santa Ana, California 92705
Telephone No. (949) 270-9400

25. ENFORCEMENT OF AGREEMENT

25.1 Events of Default.
.01 For purposes of this Section 25, the word "Default" shall mean the failure of CONSULTANT to perform any of CONSULTANT's duties or obligations or the breach by CONSULTANT of any of the terms and conditions set forth in this Agreement. In addition, CONSULTANT shall be deemed to be in Default upon CONSULTANT's (i) application for, consent to, or suffering of, the appointment of a receiver, trustee or liquidator for all or a substantial portion of its assets; (ii) making a general assignment for the benefit of creditors; (iii) being adjudged bankrupt; (iv) filing a voluntary petition or suffering an involuntary pet ition under any bankruptcy, arrangement, reorganization or insolvency law (unless in the case of an involuntary petition, the same is dismissed within thirty (30) days of such filing); or (v) suffering or permitting to continue unstayed and in effect for f ifteen (15)

15 consecutive days any attachment, levy, execution or seizure of all or a substantial portion of CONSULTANT's assets or of CONSULTANT's interests hereunder. .02 ANAHEIM shall not be deemed to be in Default in the performance of any obligation req uired to be performed by ANAHEIM hereunder unless and until ANAHEIM has failed to perform such obligation for a period of thirty (30) days after receipt of written notice from CONSULTANT specifying in reasonable detail the nature and extent of any such fai lure; provided, however, that if the nature of ANAHEIM's obligation is such that more than thirty (30) days are required for its performance, then ANAHEIM shall not be deemed to be in Default if ANAHEIM shall commence to cure such performance within such thirty (30) day period and thereafter diligently prosecute the same to completion.

25.2 Immediate Termination for CONSULTANT's Default. In the event of any Default by CONSULTANT, ANAHEIM may immediately terminate this Agreement. Such termination shall be effective immediately upon receipt by CONSULTANT of written notice from ANAHEIM. In such event, CONSULTANT shall have no further rights hereunder, and ANAHEIM shall have all other rights and remedies as provided by law.

25.3 Termination without Cause. ANAHEIM may terminate this Agreement at any time without the necessity of cause or Default by giving seven (7) days notice in writing to CONSULTANT. In such event, the Parties shall have no further rights hereunder, except that CONSULTANT shall be paid for all services adequately rendered prior to such termination.

CONSULTANT may not terminate this Agreement except for cause.

26. COMPLIANCE WITH ALL LAWS
CONSULTANT shall at its own cost and expense comply with all statutes, ordinances, regulations and requi rements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all work prepared by CONSULTANT shall conform to applicable local, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator.

27. WAIVER
A waiver by either Party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of th e same or any other term, covenant or condition contained herein, whether of the same or a different character.

28. INTEGRATED CONTRACT
This Agreement and the exhibits hereto contain the entire agreement of ANAHEIM and CONSULTANT with respect to the matter s covered hereby, and no agreement, statement or promise made by either ANAHEIM or CONSULTANT which is not contained herein, shall be valid or binding. No prior agreement, understanding or representation pertaining to any such matter shall be effective for any purpose.

16 29. CONFLICTS OR INCONSISTENCIES
In the event there are any conflicts or inconsistencies between this Agreement and the Exhibits or any other attachments attached hereto, the terms of this Agreement shall govern.

30. INTERPRETATION
Each Pa rty acknowledges that he / she / it has had the benefit of advice of competent legal counsel with respect to its decision to enter this Agreement. The provisions of this Agreement shall be interpreted to give effect to their fair meaning and shall be cons trued as prepared by both Parties.

31. AMENDMENTS
This Agreement may be modified or amended only by a written document executed by both CONSULTANT and ANAHEIM and approved a s to form by the City Attorney.

32. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be held invalid or unenforceable, the remainder of this Agreement, or the application of its terms and provisions to persons and circumstances other than those to which it has been held invalid or unenforceable shall not be affected thereby, and each term and provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law.

33. REMEDIES CUMULATIVE
The remedies given to ANAHEIM and CONSULTANT herein shall be cumulative and are given without impairing any other rights given ANAHEIM or CONSULTANT by statute or law now existing or hereafter enacted and the exercise on any one (1) remedy by ANAHEIM or CONSULTANT shall not exclude the exercise o f any other remedy.

34. NO THIRD PARTY BENEFICIARIES
The Parties intend that no rights nor remedies be granted to any third party as a beneficiary of this Agreement or of any covenant, duty, obligation or undertaking established herein.

35. CONTROLLING LAW AND VENUE
The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange.

17 36. DISCRIMINATION
CONSULTANT agrees not to discriminate against any person or class of persons by reason of sex, color, race, creed, religion, marital status, handicap, ancestry, national origin or other prohibited basis in its provision of Services or hiring of subcontra ctors or employees. To the extent this Agreement provides that CONSULTANT offer accommodations or services to the public, such accommodations or services shall be offered by CONSULTANT to the public on fair and reasonable terms.

37. AUTHORITY
Each individ ual executing this Agreement on behalf of a corporation, nonprofit corporation, partnership or other entity or organization, represents and warrants the he or she is duly authorized to execute and deliver this Agreement on behalf of such entity or organiza tion and that this Agreement is binding upon the same in accordance with its terms. CONSULTANT shall, at ANAHEIM's request, deliver a certified copy of it governing board's resolution or certificate authorizing or evidencing such execution.

38. EFFECTIVE DATE
This Agreement shall be effective on the date on which this Agreement is executed by ANAHEIM ("Effective Date").
[Signatures on Following Page]

18 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the dates hereinafter respectively set forth.

DATE OF EXECUTION:

CITY OF ANAHEIM
a municipal corporation

By:

“ANAHEIM”
ATTEST:

By:

City Clerk of Anaheim

DATE OF EXECUTION:

ITERIS, Inc., a Delaware corporation

By:

Title:

Printed Name:

“CONSULTANT”

APPROVED AS TO FORM:

ROBERT FABELA, CITY ATTORNEY

By:

Bryn M. Morley
Deputy City Attorney
Dated:

Attachments: Exhibit A
158411
Senior Vice President
Steven Bradley

1 EXHIBIT A

STARTS AFTER THIS PAGE
City of Anaheim
State College Boulevard - The City Drive
Regional Traffic Signal Synchronization
Program Project
Iteris’ Proposal Response For:

Electronic Copy
11477-117.26
March 26, 2026

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 0

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 1 March 26, 2026
Ms
. Jane Keely/Mr. Doug Park
City of Anaheim
Public Works Department – Traffic Management Center
201 South Anaheim Blvd, Suite 502
Anaheim, CA 92805
R
e: Proposal for State College Boulevard - The City Drive Regional Traffic Signal Synchronization Program Project
11477-117.25
Dear Ms. Keely and Mr. Park:

The Orange County Transportation Authority (OCTA)’s Regional Traffic Signal Synchronization Program (RTSSP) has been coordinating traffic signals across municipal boundaries since 2010. Beyond synchronization, this program has also modernized the arterial infrastructure with targeted Intelligent Transportation Systems (ITS) to enable optimization of mobility management not just in one jurisdiction but across critical multi-jurisdictional corridors throughout Orange County. Your project, focusing on the State College Boulevard – The City Drive corridor, presents a unique opportunity to modernize critical infrastructure across the cities of Brea, Fullerton, Anaheim, and Orange, as well as key intersections under Caltrans jurisdiction.

We offer Anaheim our expertise. Our mission is to make mobility safer, efficient, and sustainable for everyone.

Our singular focus is to support our clients’ mobility challenges through this lens. Iteris has been involved in more than 40 RTSSP projects since the program began, which has given us practical experience with this type of work. We were also selected by OCTA to perform the Countywide Baseline signal synchronization project and are currently supporting similar efforts with you in Anaheim. This project builds on that experience, focusing on the design and installation of targeted ITS infrastructure within the corridor to support overall program objectives. Expertise is our key differentiator in delivering this project successfully.

Ms. Naree Kim, the proposed Project Manager for this project, brings extensive experience in design and RTSSP projects. Since she is not directly involved in the Countywide Baseline effort, she will be able to dedicate her full attention to the Anaheim project. In addition, Iteris’ current involvement in the Ball Road-Taft Ave RTSSP , Euclid RTSSP, and Tustin-Rose RTSSP provides familiarity with Anaheim and Orange’s existing infrastructure and corridor-specific considerations. Our work on the City of Brea’s citywide fiber and communication upgrades further contributes relevant experience with network infrastructure and system integration. Additionally, Linscott Law & Greenspan (LLG), our subconsultant, have in-depth understanding and experience in the City of Fullerton through its current involvement in the Yorba Linda Boulevard RTSSP.

By leveraging our previous experience, local knowledge, and integrated solutions, Iteris, a corporation, is committed to delivering reliable and cost-effective design and construction support for the State College Boulevard - The City Drive RTSSP Project. Further, I personally live in Anaheim, so I am personally invested in your project. We look forward to discussing how our team can support you in achieving the project goals.

This proposal and price shall remain valid for 120 days from the date of submission. Iteris acknowledges receipt of Addendum #1 released March 12, 2026. This proposal is submitted subject to the successful negotiation of a mutually agreeable contract between Iteris and the City. Please contact me at (949) 270-9647 or [email protected], or Naree Kim at (949) 374-0418 or [email protected], should you have any questions.

Sincerely,
I
teris, Inc.

S
teven Bradley, PE
Senior Vice President | Mobility Consulting Services, West Steven Bradley, PE, is authorized to
negotiate this contract on behalf of Iteris
A | COVER LETTER

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 2

B| FIRM AND TEAM EXPERIENCE

B | FIRM AND TEAM EXPERIENCE

Firm Information

NAREE KIM, PE | PROJECT MANAGER
Education: MS, Civil Engineering, University of Utah, UT, 2003 BS, Civil Engineering, University of Utah, UT, 2000
Registration: Civil Engineer (PE) NV #022518, 2013
Availability: 50%

Ms. Kim has over 23 years of experience in planning, design, and implementation of traffic engineering and ITS projects. She previously served as Project Manager for the MacArthur Boulevard RTSSP project and has successfully delivered projects and secured new work with multiple agencies, including the preparation of OCTA Project P applications.

She has been involved in the early stages of the OCTA Countywide Baseline Project for Data Collection T ask, as well as the OCTA-led Katella Avenue RTSSP Design-Build Project. In addition, she has managed various design projects for the City of Anaheim, including traffic signal upgrades incorporating dilemma zone detection.

Her ITS design experience includes traffic signal system upgrades, fiber optic communication networks, and freeway traffic management systems. Ms. Kim develops effective solutions to complex traffic challenges while successfully managing project budgets and scope. She is committed to delivering sustainable transportation designs, with an emphasis on systems engineering analysis and the integration of emerging technologies.

Some of her relevant projects include:
• Orange County Transportation Agency, Countywide Baseline Signal Synchronization Project • City of Irvine, Red Hill Avenue Traffic Responsive Operations Project • City of Laguna Niguel, La Paz Road/Cabot Road RTSSP Project • LA Metro, I-710 and I-105/405 Integrated Corridor Management Projects (previous firm)

Ms. Kim, serving as the Project Manager, will be the primary contact with the City during the entire duration of the project.

Iteris, Inc.

Form of Organization
Corporation

Firm Size (Number of
Employees)
470+

Local Address
1700 Carnegie Ave.

Suite 100
Santa Ana
CA 92705-5551
Iteris has been the market leader in smart mobility infrastructure management since 1987. Iteris’ staff have decades of expertise in traffic signal synchronization and ITS project design and traffic management, along with superior services and patented products that help detect, measure, and manage traffic and vehicular performance, minimize traffic congestion, enhance safety, and empower Iteris clients with solutions to better manage their transportation networks.

Iteris team members are experts in the fields of transportation planning, traffic engineering, traffic signal timing and ITS. Knowledge of these practice areas enables Iteris to provide comprehensive services ranging from initial traffic impact studies, transportation modeling, planning, systems engineering, and detailed design, through implementation and performance measurement/monitoring. Iteris combines the knowledge of transportation engineers, systems engineers, system integrators, software engineers, and transportation planners to offer an unmatched combination of talent and experience. Iteris develops and deploys innovative solutions that help agencies reduce traffic congestion, enhance transit use, monitor and manage transportation networks and provide greater access to reliable traveler information.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 3

B| FIRM AND TEAM EXPERIENCE

Organizational Chart
With local offices in Santa Ana and Los Angeles, Iteris has the resources of over 100 team members throughout California dedicated to Traffic Engineering, Transportation Planning, and ITS. Iteris’ proposed team organization is provided in Figure 1. We concur with the City’s proposed restrictions on changes to key personnel. Full resumes for key staff are located in Appendix B.

Figure 1 – Organizational Chart

SUPPORT STAFF
• Diego Simmonds (60% available)
• Eric Chiu (60% available)
• Sahila Sarjana (50% available)
• Omid Modaghegh, IMSA, MCSE(45% available)
• Serena Cortez (50% available)
• Lesley Ng (50% available)
• LLG staff: Felipe Ortega, (60% available)
• Jim Sahagaun (60% available)

Subconsultants
To support the successful delivery of this project, Iteris is partnering with Linscott Law & Greenspan (LLG), whose proven experience and technical proficiency will provide specialized expertise that enhances the depth, quality, and technical capabilities of the project team.

600 South Lake
Avenue, Suite 500,
Pasadena, CA 91106
(626) 796.2322
www.llgengineers.com
LLG has been providing transportation planning and traffic engineering design services to public and private sector clients throughout their 56-year history.

LLG currently provides on-call traffic engineering consultation services to several municipalities throughout Southern California, including the Cities of Brea, Cypress, La Habra, Los Angeles, Irwindale, Dana Point, and Gardena, among others. Their experience and qualifications provide municipalities with the expertise to address all types of transportation goals and issues. For this project, LLG will support Iteris in preparing ITS design plans, as well as providing integration and construction support for the City of Fullerton, drawing on their prior experience with the Yorba Linda RTSSP project, which included State College Boulevard fiber optic upgrades. LLG is also familiar with the City’s existing signal and ITS infrastructure, as well as its operational needs.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 4 B| FIRM AND TEAM EXPERIENCE
Key Staff Profiles
Iteris is pleased to present the following key personnel assigned to the project who will assist Ms.

Naree Kim with the successful delivery of this project to the City.

BERNARD K. LI, EE, TE, PTOE| PRINCIPAL-IN-CHARGE
Education: BS, Electrical Engineering, University of Southern California, Los Angeles, 1988
Registration: Civil Engineer (PE) CA #14842, Traffic Engineer (TE) CA #1763, Professional Traffic Operations (PTOE) #214
Availability: 55%
Mr. Li serves as Principal-in-Charge, conducting detailed reviews of deliverables, ensuring compliance with established standards, and assisting in the review of Plans, Specifications, and Cost. He has over 38 years of experience in providing professional services in planning, design and implementation of traffic engineering and ITS. In his PIC role, he will leverage his extensive experience with OCTA’s Countywide Baseline Program and work with local agencies to ensure consistency, compliance, and technical excellence. His depth of experience enables proactive identification of risks, effective resolutions of complex technical issues, and delivery of high- quality, agency-ready deliverable throughout the project.

JOSHUA MCNEILL, PE, TE, PTOE| QUALITY ASSURANCE
Education: MS, Civil Engineering (Transportation Systems), University of California, Irvine, 2012
Registration: Civil Engineer (PE) #79151, Traffic Engineer (TE) CA #2792, Professional Traffic Operations (PTOE) #4870
Availability: 40%
Mr. McNeill, as quality assurance manger, brings over 10 years of design and RTSSP project experience (17 years overall). He has experience of managing RTSSP projects including recent work with Santa Ana, Huntington, Mission Viejo and Irvine from project inception to completion. He also managed signal timing development and implementation for intersections along the Bolsa Chica/Valley View corridor through the I- 405 design build project and other OCTA regional traffic signal synchronization project. He provides solutions to traffic problems while effectively managing budgets and scope of work. Mr. McNeill is committed to delivering sustainable transportation solutions, with a focus on systems engineering analysis and the application of emerging technologies. His experience successfully closing out past RTSSP projects, combined with his role as QA/QC Manager on this project, will provide an added layer of quality and contribute to overall project success.

ANDREW FREEMAN, PE (IL), TE, PTOE | DEPUTY PM TASKS 3.1, 3.2, 3.4 LEAD Education: BS, Civil Engineering, University of Illinois Urbana-Champaign, IL Registration: Civil Engineer (PE) IL #062.070815, Traffic Engineer (TE) CA #3153, Professional Traffic Operations Engineer (PTOE) #4607
Availability: 45%
Mr. Freeman brings over 11 years of specialized experience in transportation and traffic engineering. His expertise includes project management, design, and construction support for a wide range of traffic infrastructure projects, including Yorba Linda RTSSP, Tustin Avenue- Rose Drive RTSSP , and OCTA’s Contract
Task Order 2 Project (Bake Parkway & Rockfield, Crown Valley Parkway and Moulton Parkway RTSSP). Mr.

Freeman’s area of expertise includes the design and implementation of traffic signal systems, ITS improvements, and communication infrastructure. He is also highly experienced in the preparation and review of signing and striping plans.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 5 B| FIRM AND TEAM EXPERIENCE
MICHELLE HAAS, PE, TE | TASKS 4, 5, 6, 7, 8 LEAD
Education: BS, Civil Engineering, University of Maryland, College Park Registration: Civil Engineer (PE) CO #00065323, 2024, Traffic Engineer (TE) CA #3091,
Availability: 55%
Mrs. Haas brings over 8 years of experience working in the fields of transportation engineering, operations, and planning. Mrs. Haas has provided signal timing synchronization and implementation services as part of OCTA RTSSP projects including Warner Avenue, 1st Street / Bolsa Avenue, Irvine Boulevard / Trabuco Road, and Bolsa Chica Street / Valley View Street corridors. Her signal timing expertise includes the development of school timing plans, leading pedestrian intervals (LPIs), exclusive pedestrian phases, and left-turn phase reservice. Mrs. Haas has served as a Project Manager, Task Lead, and Operator in city Traffic Management Centers (TMCs), providing real-time signal timing adjustments to support special events and evolving traffic conditions. She has also developed and implemented signal timing databases on-site in city TMCs using Centracs and Transparity, supporting efficient implementation and close coordination with city staff.

BRIAN HERTING, PE | TASK 2 LEAD
Education: BS, Civil Engineering, Montana State University, Bozeman, MT
Registration: Civil Engineer (PE) CA #84337
Availability: 55%
Mr. Brian brings over 17 years of experience on a variety of traffic and transportation projects. He has delivered complex multi-disciplinary projects for several different local municipalities and transit agencies throughout Southern California. His expertise includes signing and striping, traffic control and traffic handling, traffic signal systems, active transportation solutions, ITS improvements, communication systems, lighting and photometric analysis, and electrical design.

BRIAN AKERLEY, MELE | TASK 3.3 LEAD
Education: BA, Business and Leadership Studies, California State Polytechnic University, Humboldt, CA
Registration: Electrical Contractor Licensing CA #1096882, 2017-Present Availability: 50%
Mr. Akerley brings over 24 years of comprehensive experience as a results-focused professional with extensive experience in electrical engineering, electrical contracting, telecommunications, and ITS installation and maintenance. Brian has been responsible for the oversight and delivery of many high-level projects for municipalities, counties, State DOTs, and transit agencies. In addition to his leadership, and project delivery skills, Brian is the licensing Qualifier for Iteris responsible for acquiring the state licensing necessary to lay the
groundwork for business development nationally.

Felipe Ortega | KEY SUBCONSULTANT SUPPORT AND PRIMARY POINT

OF CONTACT
Certification: IMSA L3, CSS 1
Availability: 40%
Mr. Ortega trains engineering and maintenance staff in the use of system hardware and software, including newly deployed traffic systems and TMC equipment. He also supports LLG clients both onsite and remotely with design implementation, procurement coordination, and final system integration of signal systems, controllers, and TMC hardware. He will also serve as the primary point of contact for subconsultant coordination. His experience across a wide range of communications infrastructure, along with his ba ckground
in installing and configuring software and hardware for various systems used throughout Southern California, allows him to effectively support installation, configuration, technical guidance, and staff training efforts.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 6

C| UNDERSTANDING OF NEED

C | UNDERSTANDING OF NEED
The City of Anaheim has secured M2 TSSP funding from OCTA to implement ITS upgrades that enhance traffic signal connectivity, communications, and synchronization along State College Boulevard - The City Drive corridor within Orange County. Delivering these improvements requires deep expertise in corridor operations, infrastructure needs, and multi-agency coordination.

The State College Boulevard – The City Drive corridor is a major north/south arterial that is designated as a primary corridor network by OCTA’s regional traffic signal synchronization master plan. The project area encompasses an 11.3-mile corridor extending from Cliffwood Avenue to The City Drive – Garden Grove Boulevard, including 58 signalized intersections controlled by the cities of Brea, Fullerton, Anaheim, Orange, and Caltrans.

As the City’s trusted partner in previous synchronization projects, Iteris is uniquely positioned to deliver these improvements. Our team is already engaged in optimizing this corridor’s signal timing through OCTA’s Countywide Baseline Project, giving us firsthand insights into existing traffic conditions, agency operations, and technical challenges. Building upon that foundation, our dedicated team will integrate the necessary ITS infrastructure upgrades, ensuring a seamless transition from system design to construction and implementation. To further demonstrate Iteris’ commitment to delivering effective, city-specific solutions, our team conducted extensive field reconnaissance in support of this proposal. Figure 2 presents the project corridors, key design considerations of the proposed improvements, and observed signal operations around Caltrans signals identified through field investigation.

TRAFFIC VOLUMES – The corridor carries average daily traffic (ADT) volumes ranging from 13,000 to 19,000 in Brea, increasing through Fullerton to approximately 36,000 vehicles near the SR-91 interchange in Anaheim.

The southern end of the corridor in Orange carries traffic volumes up to 28,000 vehicles per day.

Managing diverse traffic demands requires more than just signal timing – it demands the expertise of a team that understands the nuances of multi-jurisdictional corridors. Iteris has successfully optimized over 2,000 signals across Southern California, including some of the region’s most complex arterials. Our proven state-of- the-art methodologies in signal coordination and adaptive traffic management ensure that synchronization strategies are tailored to varying volume conditions, maximizing efficiency across the entire corridor.

Particularly, this project focuses on timing the seven Caltrans signals along the corridor. We will leverage our existing work on the City-operated signals through Countywide Baseline Project to efficiently coordinate the Caltrans intersections within the broader system. Because signal groups have already been developed with these Caltrans locations in mind, implementation can be streamlined through aligned cycle lengths, splits, and offsets to maintain corridor-wide progression while minimizing additional effort.

ADJACENT LAND USES – Our team conducted a preliminary field review of the State College Boulevard – The City Drive corridor to assess traffic conditions and land use influences that impact mobility. The corridor serves a diverse mix of residential, commercial, industrial, and institutional uses, each contributing to unique traffic patterns and operational challenges that must be addressed through ITS solutions. • City of Brea - At the northern project limits, State College Boulevard supports a mix of residential, retail, and large commercial developments, including the Brea Mall, a regional shopping destination. These land uses generate high morning and evening peak-hour traffic volumes, necessitating a well-coordinated signal network to accommodate fluctuating demands efficiently. Iteris is currently working with the City of Brea on a major expansion of the existing city-wide ITS fiber network and citywide CCTV System upgrades. The project includes installing CCTV cameras at four city-owned locations along State College Boulevard and integrating the existing/new fiber along this corridor with the proposed redundancy path.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 7

C| UNDERSTANDING OF NEED

Figure 2 – Proposed ITS Improvements

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 8

C| UNDERSTANDING OF NEED

• City of Fullerton – SR-57, located approximately half a mile east, provides convenient regional access to Cal State Fullerton and nearby commercial and employment centers. Traffic in Fullerton is concentrated along major arterials where signalized intersections experience peak-hour congestion, particularly near freeway ramps. Proximity to SR-57 and SR-91 further influences congestion, with spillback from freeway ramps and incidents affecting adjacent intersections. Overall, the area experiences recurring congestion driven by commuter traffic, campus demand, retail activity, and freeway interactions.

• City of Anaheim – In Anaheim, State College Boulevard is bordered by SR-91 to the north, SR-22 to the south, SR-57 to the east, and I-5 to the west, making it a primary alternate route when the freeways are congested. Additionally, the corridor is heavily used by visitors traveling to and from Angel Stadium, The Grove, and the Honda Center. Traffic volumes include significant vehicle and truck traffic, particularly near the SR-91 interchange, and fluctuate considerably during events at these major venues. These patterns highlight the need for ITS upgrades that enhance corridor efficiency, improve traffic management, and support freight mobility.

• City of Orange – The City Drive is one of the busiest principal arterials and the backbone of several activity centers in west Orange. The southern limit of this corridor is surrounded by regionally significant land uses, including the Outlets of Orange, the University of California, Irvine (UCI) Medical Center, various business centers, civic center, and high-density housing. Additionally, The City Drive connects two major freeways within Orange County in less than a mile: SR-22 and I-5. Implementing multimodal- friendly ITS solutions will be essential to improving safety and accessibility.

By integrating ITS tailored to the distinct needs of each jurisdiction, our approach will improve corridor-wide signal coordination, optimize mobility for all users, and enhance the overall transportation network’s efficiency.

The overall goal of the project is to deploy advanced technologies that will result in more efficient traffic detection and optimized operation of signalized intersections on the project corridor. The components of the work include:

1. Fiber Optic (FO) and Ethernet Communication Upgrades The project includes replacing approximately 24,500 linear feet of fiber-optic cable in existing conduit and upgrading Ethernet switches and/or fiber patch panels at 39 locations across multiple agencies to enhance traffic signal communications. These upgrades will support high-speed switching (up to 10 Gbps) for traffic signal controllers, cameras, and sensors, enabling faster data transmission, reduced latency, and improved remote monitoring while accommodating future device expansion.

With extensive experience deploying fiber-optic infrastructure and high-speed Ethernet networks, Iteris will ensure seamless system integration and reliable performance. Iteris is also familiar with related RTSSP and ITS upgrades along corridors including Yorba Linda Boulevard, Chapman Avenue, Orangethorpe Avenue, and Ball Road–Taft Avenue, where overlapping improvements have been implemented. Coordinating these efforts helps identify opportunities for cost efficiencies, allowing potential savings to be redirected toward additional corridor enhancements. Figure 2 shows details of overlapping improvement with prior RTSSP and city’s parallel fiber upgrading project.

2. Vehicle and Bicycle Detection
The project scope includes implementing a state-of-the-art video Vehicle Detection System (VDS) (23 intersections) to enable operators to view intersections in real time and adjust signal timing based on real-time traffic conditions. These advanced detection cameras will also detect approaching bicyclists.

Iteris’ experience deploying advanced video detection systems allows for seamless integration with existing infrastructure, with configurations tailored to cabinet types such as TS1, TS2, and Type 33, as well as jurisdictional requirements. Systems can be implemented using cabinet-based or field-based processing depending on the equipment and agency preferences. This approach ensures reliable real-time detection, accurate signal operations, and compatibility with existing infrastructure.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 9

C| UNDERSTANDING OF NEED

3. ATC Signal Controller and Cabinet Upgrades
The project involves replacing outdated signal controllers with Advanced Transportation Controllers (ATC) across 41 intersections and installing 17 new traffic signal cabinets on either existing or new foundations with 5 side-mounted BBUs. Iteris will leverage decades of in-house experience to ensure all new traffic signal controllers and cabinets will be designed with state-of-the-art ITS hardware and software, enhancing system reliability and response times, reducing maintenance needs, and supporting emerging technologies such as adaptive signal control, transit signal priority (TSP), and connected vehicle applications.

4. Pedestrian Detection
The project also includes installing Accessible Pedestrian Signal (APS) at seven (7) key intersections to enhance safety for pedestrians, especially those with visual impairments. With extensive experience in implementing APS systems across various projects, Iteris ensures that each installation meets ADA standards, improving accessibility and safety for all pedestrians.

5. Emergency Preemption
The installation of emergency vehicle preemption at four (4) locations will improve response times by allowing approaching emergency vehicles to safely and efficiently traverse signalized intersections on green. This reduces delays at intersections, enhances safety for both responders and the public, and supports more reliable emergency operations. The proposed system will integrate with existing traffic signal infrastructure and ensuring seamless operation.

6. Closed-Circuit Television (CCTV) Cameras
The Project will upgrade 23 intersections with Axis CCTV cameras, to enable real-time traffic monitoring and incident detection. These cameras will help the Traffic Management Center (TMC) staff implement pre-planned response measures and adjust signal timing as needed. Many modern CCTV and video detection systems can be configured with analytics that identify conditions such as long queues or spillbacks and generate alerts, enabling city staff to respond proactively to developing traffic conditions.

7. Signal Performance Monitoring (SPM)
Implementing SPM systems such as Iteris’ ClearGuide® (9 locations) will allow respective cities to track and evaluate traffic signal synchronization using high-resolution data, enabling real-time optimization for improved traffic flow while minimizing downtime and maintenance costs. As the provider of ClearGuide, Iteris has direct knowledge of its capabilities, functionality, and operational application, which supports effective implementation and use of the system. By shifting traffic management from a reactive to a proactive approach, SPM enhances efficiency, reduces operational disruptions, and supports long-term planning. Additionally, installing RSUs at nine locations in Anaheim will enable real-time data collection, enhance traffic flow and safety, and support a scalable, future-ready transportation system. This effort expands on the RSU installations from the SMART Grant Pilot project, providing the city with a strong foundation for a citywide retrofit and preparing infrastructure for future smart city initiatives.

8. Caltrans Cooperative Agreement
Coordinating Caltrans to execute cooperative agreements with the Cities of Anaheim, Brea, and Orange will support the implementation of improvements and signal synchronization at the seven Caltrans-operated intersections. For the seven Caltrans-owned intersections, Iteris will build upon the Synchro network developed for the Baseline Project to optimize and implement signal timing plans. Drawing on our experience and established working relationship with Caltrans, including prior signal timing improvements on state-maintained facilities, we will incorporate newly collected traffic data as part of project and validate findings using ClearGuide performance analytics to support the analysis.

9. TMC and ITS System Equipment Deployments
Implementing a new ITS network and TMC systems requires seamless coordination between agency staff and project teams, a task that Iteris has successfully handled for numerous local agencies in Orange County and across the nation. The Iteris Team will manage all aspects, ensuring equipment procurement, configuration, and testing are completed before field installation. Our experts will review and expand the city’s network configuration, covering both TMC and field systems.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 10

C| UNDERSTANDING OF NEED

10. Utility Coordination
Based on the anticipated scope of improvements, this project is expected to require standard coordination and utility request with local utility agencies, including the City of Anaheim Public Utilities and Southern California Edison (SCE) at 17 cabinet replacement locations and new conduit installation segment. Standard SCE coordination typically involves identifying potential conflicts with existing electrical infrastructure, submitting required documentation, and reviewing proposed equipment locations to confirm clearances and avoid impacts to utility facilities. While routine, this process includes established review and approval steps that can affect schedule and permitting timelines, particularly if conflicts require relocation or additional utility work.

Iteris will proactively identify and address potential utility conflicts during design, coordinate early with SCE, and incorporate all required approvals into the final submittal to help avoid delays and ensure a smooth construction process.

Distinctive Advantages Offered by Iteris
Assessment of Existing Equipment: Iteris conducted a field review of the State College Boulevard–The City Drive corridor, evaluating traffic signal and ITS infrastructure across all partner agencies. This assessment documented cabinet equipment, controller types, pull boxes, conduit conditions, and cable routing, producing an inventory of critical assets. The findings identified infrastructure gaps, equipment compatibility issues, and potential upgrades, ensuring that proposed ITS and signal improvements will align with agency standards, including OCTA Measure M2 requirements, NTCIP compliance, and Caltrans coordination. Our approach prioritizes a seamless integration of new and existing equipment to create a cohesive, low-maintenance, and future-proof system. All controller upgrades, communication enhancements, and ITS additions are evaluated for compatibility with existing systems. Iteris’ in-house testing ensures equipment meets standards before the plans are finalized. This future-focused strategy supports phased expansion, evolving technology integration, and long-term corridor optimization, providing a valuable planning resource for Anaheim and its regional partners.

Ensuring Equipment Compatibility: Iteris prioritizes seamless integration of new and existing equipment to deliver a cohesive, low-maintenance, and future-ready system for the City of Anaheim and its partner agencies. Our holistic approach ensures that controller upgrades, communications enhancements, and ITS infrastructure align with existing systems while complying with NTCIP standards, OCTA guidelines, and Caltrans coordination protocols. This interoperability reduces the risk of system failures, network inconsistencies, and compatibility issues, while supporting a scalable environment for phased expansion and evolving technologies.

This approach is demonstrated in Iteris’ ITS network design for the City of Corona, California, which has been in service since 2009 and successfully expanded through multiple phases using a standards-based architecture that enabled seamless equipment compatibility and a stable IP framework. For the State College Boulevard – The City Drive corridor, Iteris will apply this proven methodology to ensure cohesive operation of all traffic signal and ITS components across jurisdictions, delivering a standardized, scalable, and cost- effective synchronization network that enhances mobility and minimizes long-term maintenance.

Practical and Constructible Design Plan: Iteris’s in-house construction team ensures designs undergo thorough constructability review, identifying potential field issues early and collaborating with cities to minimize project disruptions. This proactive approach makes designs practical, cost-effective, and aligned with agency needs, helping keep the project on schedule. Based on our experience, one of the most common challenges in these projects is conduit installation and existing conduit conditions. To address this risk, Iteris has included an optional service to further evaluate and verify conduit conditions early in the process, helping Anaheim avoid potential conflicts, delays, and cost overruns.

As an optional Value-Added Service, Iteris is proposing to install underground conduit capacity for additional cabling, particularly fiber optics, through a systematic process: clearing debris with compressed air, running a rodder to confirm unobstructed pathways, and installing mule tape to ensure pull lines can be placed safely.

This process reduces installation risks (minimizing contractor CCOs and construction delay), confirms conduit readiness, and supports future network expansion.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 11

C| UNDERSTANDING OF NEED

Accelerated Procurement Process: This will help to prevent delays in equipment delivery due to long lead times. Additionally, Iteris will review vendor quotes and provide feedback as required.

To mitigate long lead time, particularly for Traffic Signal Cabinets, Iteris will begin the procurement process as early as the 60% design stage, pending City approval.

If needed, Iteris will assist Anaheim and partnering agencies with the procurement and installation of approved equipment and license and provide on-site support for integration with existing Traffic Management Center (TMC) systems. Additionally, procuring equipment during the design phase as an option allows for pre- configuration and testing, ensuring a smooth and efficient installation process. Unlike traditional contractors who apply markups of 15-20% on equipment, Iteris reduces costs by leveraging its in-house capabilities. In addition, if required, Iteris can provide self-construction support on an as-needed basis to address unforeseen conditions or expedite construction, further saving time and cost.

OCTA Initial Payment Request: Securing upfront funding for RTSSP projects can be challenging for lead agency. To ease this financial burden, Iteris will assist the City of Anaheim in requesting an initial payment covering up to 75% of contracted funds for the Primary Implementation (PI) phase. With extensive experience in preparing and submitting OCTA Form 10-10 (Project P Revised Cost Estimate), Iteris will ensure the accurate completion of all necessary documentation to facilitate timely reimbursements.

Given that the initial payment request is one-time opportunity, Iteris will work closely with Anaheim to determine the optimal timing for submission. Iteris has successfully navigated this project for Tustin Ave – Rose Drive RTSSP and secured the initial payment for the City of Orange (lead agency) enabling efficient project administration. Through meticulous recordkeeping and financial tracking, Iteris will support Anaheim in managing expenditures, maintaining compliance with OCTA’s funding requirements, and maximizing available resources for project success.

Proactive Traffic Disruption Mitigation with Real-Time Insights: Iteris is proposing to use a data-driven approach to minimize traffic disruptions during equipment installation. Leveraging our ClearGuide platform—primarily through the Baseline Project, which is accessible to all local agencies- we will analyze real-time and historical traffic patterns to identify optimal work windows, reducing congestion and enhancing safety for drivers and construction personnel.

For the State College Boulevard–The City Drive corridor, ClearGuide will guide scheduling of ITS upgrades and supplement traditional floating car runs by providing corridor-level insights with minute-by-minute probe data along Caltrans intersection segments. Its continuous performance monitoring and high spatial resolution enable comprehensive evaluation of existing conditions and potential improvements. As a Value-Added Service, if “Before” and “After” comparisons from ClearGuide prove sufficient, labor savings from reduced floating car runs can be redirected to support Traffic Management Center (TMC) enhancements.

Comprehensive Training for City Staff: Iteris goes beyond standard vendor-led training by leveraging our deep expertise in ITS deployment and operations to provide hands-on, practical instruction tailored to the Cities’ specific needs. We coordinate with equipment vendors to introduce City staff to new systems – such as Advanced Traffic Controllers (ATC) and Hybrid Vehicle Detection technologies, which integrate multiple detection methods for enhanced accuracy. In addition, our team enhances this training with real-world insights, troubleshooting techniques, and best practices gained from years of designing, implementing, and maintaining similar systems. Unlike others who may rely solely on vendor materials, Iteris ensures that traffic signal technicians and maintenance personnel receive customized, scenario-based training. This approach equips them with the knowledge and confidence to effectively operate and maintain the upgraded infrastructure long after project completion.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 12

D| RELEVANT PROJECT EXPERIENCE

D | RELEVANT PROJECT EXPERIENCE

Please accept my deepest appreciation for the great work you have done and continue to do for the CITY OF SANTA ANA…. I have really enjoyed working with you, starting with our first project Warner Ave Traffic Signal Synchronization…. Your ability to put the client’s needs ahead of your own is greatly appreciated.

- Cesar Rodriguez, PE (City of Santa Ana Senior Civil Engineer)

OCTA, COUNTYWIDE SIGNAL SYNCHRONIZATION BASELINE PROJECT- ORANGE

COUNTY, CA

Contact Person Alicia Yang, PE, Project Manager III, OCTA, 600 South Main Street, Orange, CA 92868, (714) 560-5362, [email protected]

Duration 2024 – 2029
Project Description: Iteris was selected by OCTA for the $10M Countywide Signal Synchronization Baseline Project. This project is a strategic reset of the traffic signal synchronization baseline for over 2,500 signals in Orange County. It represents a significant shift in approach, acknowledging the need for realigning timing plans with contemporary traffic conditions while leveraging emerging technologies. To achieve this, Iteris will leverage our analytics platform ClearGuide to capture a broader spectrum of signal performance metrics to guide signal retiming and monitoring of the network. This shift towards data-driven decision- making reflects continuing trends in our industry and regional traffic management. Most importantly, this effort will continue OCTA’s position as a national leader in arterial management that focuses on safety and sustainability for all roadway users.

As part of this project, Iteris will also help OCTA and all Orange County agencies redefine a new Corridor Signal Performance Index (CSPI) using big data metrics (e.g. speed index, travel time index, buffer time index, etc.).

Project Relevance:
• Development and optimization of traffic signal timing plans, including coordinated operations along the State College Boulevard – The City Drive corridor
• Comprehensive traffic data collection and performance analysis to support TSSP design and signal timing validation
• Use of performance-based metrics to evaluate corridor operations and support before-and-after assessments

CITY OF YORBA LINDA, YORBA LINDA BOULEVARD/WEIR CANYON ROAD CORRIDOR

REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROJECT- YORBA LINDA, CA

Contact Person Tony Wang, Traffic Engineering Manager, City of Yorba Linda, 4845 Casa Loma Avenue, Yorba Linda, CA 92886, (714) 961-7170, [email protected]

Duration 2023 - 2026
Project Description: Under the terms of the multi-year, $1.2 million agreement, the primary objective is to implement optimized traffic signal timing to improve traffic flow across the entire corridor, as well as technology upgrades for ITS and traffic systems that directly provide a positive impact to monitor and manage traffic flow along the Yorba Linda Boulevard/Weir Canyon Road corridor. The effectiveness of the traffic operations will be maintained for 2 years beyond the date of the complete project implementation acceptance. Iteris will also create multiple reports aimed at improving mobility, including a measure-of-

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 13

D| RELEVANT PROJECT EXPERIENCE

effectiveness (MOE) analysis, travel time analysis, travel time comparison, and congestion hotspot analysis.

The project—which will impact 87 intersections across four cities—utilizes Iteris’ ClearGuide solution and is funded by the Orange County Transit Authority’s Regional Traffic Signal Synchronization Program (RTSSP).

Project Relevance:
• End-to-end project support across all phases of a multi-jurisdictional signal synchronization project, providing consistent leadership across project administration, design, bidding, equipment procurement, integration, and construction
• Equipment selection and procurement management, including identification of preferred equipment models and oversight of documentation, resulting in cost savings through Iteris’ low markup and streamlined purchasing
• Construction coordination and field support through direct collaboration with the contractor to facilitate installation activities, confirm design intent, and promptly resolve field issues to maintain schedule and quality

CITY OF ANAHEIM, BALL ROAD-TAFT AVENUE TRAFFIC SIGNAL SYNCHRONIZATION PROJECT – ANAHEIM, CA

Contact Person Jane Keely, Principal Traffic Engineer, City of Anaheim, 200 S. Anaheim Blvd., Anaheim, CA, 92805, (714) 765-5202, [email protected]

Duration 2025 – 2028
Project Description: Iteris provides project management, data collection, field review, ITS design, and traffic signal synchronization services along the 10-mile Ball Road/Taft Avenue corridor, which includes 37 signalized intersections operated by the City of Anaheim, the City of Orange, and Caltrans. The project includes a detailed field review to document existing conditions, assess equipment needs, and support the development of design plans for ITS and traffic signal improvements such as wireless radios, fiber optic cable and equipment, Ethernet switches, traffic signal controllers and cabinets, CCTV cameras, video detection systems, EVP equipment, and central system upgrades. Iteris has also updated coordinated signal timing plans for Caltrans intersections. Iteris will assist the city with identifying and procuring future equipment upgrades and will provide construction support services during the implementation phase. Following construction, Iteris will support a 24-month operations and maintenance (O&M) phase, preparing operational analyses and providing ongoing technical support to ensure the corridor’s synchronization objectives are achieved.

Project Relevance:
• Coordinated closely with each participating agency to develop design plans and redlines tailored to their operational needs, preferred equipment standards, and available budgets. • Evaluated proposed ITS and traffic signal improvements against construction bid pricing to establish a prioritized list of upgrades that maximized corridor benefits while remaining within funding constraints. • Assisting the Cities with equipment procurement, applying Iteris’ familiarity with vendor offerings and pricing to help identify cost‑effective solutions and ensure compatibility with existing infrastructure.

CITY OF LA HABRA, EUCLID STREET CORRIDOR PROJECT REGIONAL TRAFFIC SIGNAL

SYNCHRONIZATION PROGRAM (RTSSP) - LA HABRA, CA

Contact Person Andrew Luna, PE, Senior Civil Engineer, City of La Habra, 110 E. La Habra Blvd, La Habra, CA 90631, (562) 383-4156, [email protected]

Duration 2023 – 2028
Project Description: Iteris was selected by the City of La Habra for this project, which includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street.

The project limits are Euclid Street/La Habra Boulevard in the City of La Habra to Euclid Street/I-405 Ramps

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 14

D| RELEVANT PROJECT EXPERIENCE

in the City of Fountain Valley. The project segment is approximately 16.9 miles long and includes six (6) signals maintained by the City of La Habra, thirteen (13) signals maintained by the City of Fullerton, fifteen (15) signals maintained by the City of Anaheim, eleven (11) signals maintained by the City of Garden Grove, five (5) signals maintained by the City of Santa Ana, nine (9) signals maintained by the City of Fountain Valley, and eight (8) signals maintained by Caltrans. The Euclid Street Corridor is designated by the County as a Signal Synchronization Network Corridor in the Regional Traffic Signal Synchronization Master Plan. It is likewise classified as a Major/Primary arterial highway in the Orange County Master Plan of Arterial Highways (MPAH). Iteris is conducting all engineering, construction management, inspection, and administrative tasks necessary to complete the project. This includes acquiring encroachment permits, environmental and utility clearance, final design plans, project specifications, quantity and cost estimates, and all compliance efforts needed to meet Local, State, and Federal requirements. Iteris is required to be familiar with the requirements of each partnering agency. This project includes the design and deployment of optimized signal timing as well as fiber optic communication planning and upgrades, ITS device design, deployment and integration, deployment of video detection systems, Traffic Management Center upgrades, traffic management system deployment and several traffic signal design improvements.

Iteris utilizes the advanced tools from ClearGuide Signal Trends and Signal Performance Measures (SPM) to provide continuous monitoring of the traffic system, which will result in improved corridor performance throughout the O&M period, as any degradations will be identified quickly and remedied right away instead of on the monthly interval when the corridor is driven.

Project Relevance:
• Multi-jurisdictional signal synchronization of 67 traffic signals and 69 offset signals across six Cities and Caltrans facilities
• Demonstrated expertise in delivering a City-led RTSSP project requiring extensive interagency coordination and compliance
• Proven capability in end-to-end signal and ITS design

CITY OF BREA, FIBER AND CCTV PS&E - BREA, CA
Contact Person Ryan Chapman, PE, Assistant City Engineer, City of Brea, [email protected], (714) 990- 7763, [email protected]

Duration 2024 - Present
Project Description: Iteris provides design services for a robust fiber communication network that will support deployment and integration of immediate and future (45) multi-Sensor cameras and (1417) Pan-Tilt- Zoom (PTZ) CCTV cameras at (45) signalized intersections. The network will transmit video imagery back to the planned Brea PD Avigilon Video Management System (VMS) at City Hall – employing existing city traffic fiber optics cable strands. The fiber network should provide ample bandwidth and stringent security protocols, aligning with the requirements of real-time video streaming and investigation requirements identified for Brea PD’s Integrated Crime Center (ICC). This network will facilitate the installation and integration of an additional CCTV camera at each of the 45 intersections and potentially add automated license plate readers (ALPRs) at select intersections.

Our engineering services include design, preparation of specifications, and cost estimate (PS&E) for all system components that will support the video cameras. Iteris is designing a fiber redundant backbone ring and 1-gigabit distribution rings to the edge switches at each site. This project will recommend the fiber strands to be used for the integration and operation of the PD VMS system, independent of and parallel to the city traffic fiber network. This ensures that the system not only meets but exceeds the essential needs for effective surveillance and law enforcement in the City.

Project Relevance:

• Development of a complete PS&E package for a citywide high-capacity fiber network, including gap closure and integration to City Hall
• Design and deployment of redundant and secure communication paths to support real-time and video

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 15

D| RELEVANT PROJECT EXPERIENCE

transmission
• Directly applicable to the proposed fiber gap closure of this project, ensuring reliable connectivity between the street hub and City Hall for traffic signal synchronization

CITY OF ORANGE, TUSTIN AVENUE - ROSE DRIVE REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROGRAM (RTSSP) PROJECT FOR–

Contact Person Gabrielle Hayes, PE, Principal Civil Engineer, Public Works – Traffic, City of Orange, 300 E. Chapman Ave., Orange, CA 92866, (714) 744-5561, [email protected]

Duration 2021 - 2026
Project Description: Under the project agreement, Iteris will make infrastructure upgrades, signal coordination and timing improvements, develop signal timing plans for key signalized intersections, provide vehicle turn movement counts, and perform before-and-after corridor analysis a long the Tustin Avenue/Rose Drive corridor from First Street in the City of Tustin to Wabash Avenue in the City of Yorba Linda. The project area comprises 54 signalized intersections spanning six cities – Tustin, Santa Ana, Anaheim, Orange, Placentia, and Yorba Linda – as well as key highway on/off ramps under Caltrans, in Orange County, California.

Iteris is providing ITS upgrade design, bid, and construction support, and traffic signal synchronization services along the Tustin Avenue/Rose Drive corridor from First Street in the City of Tustin to Wabash Avenue in the City of Yorba Linda. The project area comprises of 54 signalized intersections in Orange County, California, spanning six cities (Tustin, Santa Ana, Anaheim, Orange, Placentia, and Yorba Linda) as well as several highway ramps under Caltrans jurisdiction. ITS equipment upgrades installed as part of this project include fiber-optic communications, closed-circuit television (CCTV), video detection systems (VDS), radar detection systems, traffic signal controllers and cabinets, and wireless radios. Iteris assisted the lead agency, the City of Orange, in assembling bid and contract documents. Iteris also provided construction support throughout the project, which included tasks such as scheduling and leading meetings, reviewing submittals, responding to requests for information (RFIs), reviewing change orders, investigating and troubleshooting field issues, verifying and documenting construction quantities, and assisting in preparing and processing reimbursements. Iteris is currently providing traffic signal coordination timing plans for the 54 signalized intersections and will be providing continuous management and signal timing support services for the duration of the monitoring and maintenance phase of the project.

Project Relevance:

• End-to-end project support across all phases of multi-jurisdictional signal synchronization project, providing consistent leadership across project administration, design, bidding, equipment procurement, integration, and construction
• Equipment selection and procurement management, including identification of preferred equipment models and oversight of documentation, resulting in cost savings through Iteris’ low markup and streamlined purchasing
• Construction coordination and field support through direct collaboration with the contractor to facilitate installation activities, confirm design intent, and promptly resolve field issues to maintain schedule and quality

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 16

E| PROJECT CONTROLS

E | PROJECT CONTROLS

INTERNAL CONTROLS TO TRACK AND REPORT COST AND COMPLETION Management Reporting Systems /Tools
Iteris has a strong history of successful project administration, led by Project Manager Naree Kim, whose methodology effectively measures progress, anticipates issues, responds to changing requirements, and maintains schedule integrity. She is also familiar with the City’s project management systems and reporting requirements through prior City projects, including the Ball Road – Taft Avenue RTSSP .

Iteris’ project management approach incorporates structured checks and balances to support successful project delivery. Key objectives include developing a clear technical scope, establishing realistic cost and schedule plans, maintaining a comprehensive control system for status reporting, identifying and addressing issues early, ensuring regular communication with Anaheim and partner agencies, and maintaining thorough documentation through QA/QC procedures.

The project controls process, shown in Figure 3, follows a structured sequence of project initiation, ongoing cost-to-complete reviews, a formal review at 75% completion, and final project closeout.

Performance Monitoring
Monitoring technical
performance, schedules,
and costs through a
combination of automated
and manual methods
enables early identification
of deviations from planned
performance and timely
corrective action. Project
activities are continuously
tracked and compared
against the baseline
schedule and budget to
assess progress, evaluate
the impact of delays, and
identify areas of concern.

Work progress is assessed
through milestones,
completed and in-progress
tasks, and dependencies
on upcoming activities. The
Iteris Project Manager
maintains regular
communication with the
City’s Project Manager,
supplemented by
scheduled team meetings
and ongoing coordination.

Subconsultant performance is managed through clearly defined subcontracts that establish roles, responsibilities, deliverables, schedules, and level of effort prior to work initiation. Iteris leadership supports project success by providing resources, maintaining a productive work environment, and monitoring project team performance. Monthly internal management review meetings are conducted to evaluate project status against the current schedule, with particular attention to changes from previously established baselines.

Figure 3 – Project Controls Process

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 17

E| PROJECT CONTROLS

Monthly Progress Reports
The Iteris Project Manager will submit a monthly written progress report to Anaheim summarizing activities from the previous month and outlining planned work for the upcoming period. The report will track progress against the work plan, including budget and schedule adherence, and forecast future expenditures and deliverable dates. It will typically include a summary of monthly and upcoming activities, issues and resolutions, updated project schedule, subcontractor status, open and closed items, deliverable status, cost-to- complete forecast, and any Scope of Work changes.

Project Status Meetings
Iteris will discuss the progress report in a 30-minute bi-weekly verbal update with Anaheim’s Project Manager.

Our Project Manager will summarize current activities, discuss concerns, report on milestones, evaluate future technical and financial requirements, and obtain feedback from Anaheim.

QUALITY CONTROL ABILITY
Iteris’ ability to deliver high-quality products is driven by a comprehensive QA/QC program that ensures accuracy, usability, and consistency across all project deliverables. For this project, the Iteris Project Manager will establish clear QA/QC objectives at project kickoff and oversee implementation throughout the project lifecycle, covering all aspects of production including analyses, documentation, design plans, graphics, and presentations.

The QA/QC process, as shown in Figure 4, incorporates multiple levels of review, including self-checks by the author and independent reviews by qualified senior staff with relevant expertise. This interdisciplinary approach helps identify errors, inconsistencies, and opportunities for improvement while ensuring clarity for both technical and non-technical audiences. Adequate schedule time will be allocated for thorough reviews and incorporation of comments into final deliverables.

Graphics and presentation materials will receive particular attention due to their importance in communicating with the public and decision-makers, and all materials will be prepared in alignment with the City’s communication guidelines. Iteris will also coordinate closely with the City on public presentations to ensure accuracy, clarity, and consistency in all communications.

Additionally, resource allocation across project tasks will be carefully managed to ensure the appropriate level of effort is applied at each phase, supporting efficient delivery and high- quality outcomes. Prior to making any staffing changes, Iteris will notify the City and provide the rationale for the adjustment.

Changes will be implemented as needed to maintain schedule and budget, while keeping the City informed of any significant updates.

TASK INITIATED
Originator
Technical Staff
Reviewer
Task Lead
Verifier
Senior Advisor/QC
Preparation of
Document
Task Lead
Document
Submitted
Project Manager
Ready for
Submittal
?
NO
YES
Figure 4 – QA/QC Process

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 18

E| PROJECT CONTROLS

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 18

F| SCOPE OF SERVICES & SCHEDULE

Iteris will fully perform and meet all task and sub-task requirements as outlined in the RFP . Given the page limitations, the following descriptions highlight key aspects of each task. Also, for the sake of brevity, only the most critical of the deliverables are provided under each task.

Task 1 – Project Management
A successful project occurs when all partner agencies are completely satisfied with the project outcome and all goals and objectives are met. This is not only true during the implementation phase but also for the O&M phase of the project when any degradation of corridor performance is measured, and changes are needed. To lead this comprehensive effort, at the beginning of the project, Ms. Naree Kim will lead 2 project kick-off meetings, one with Anaheim and the other with all partner agencies. As part of this meeting, communication channels, protocols, and project roles and responsibilities will be established, the scope of work, dynamic schedule, and budget will be discussed, necessary information will be gathered, and a thorough understanding of the goals of the project will be obtained.

Ms. Kim is a highly experienced project manager with extensive knowledge of OCTA project P requirements.

She has played a vital role in assisting the city with the development of Project P grant application and administrating the program of multiple OCTA RTSSP projects. This hand-on experience ensures comprehensive and efficient project administration. Iteris will also prepare staff reports for City Council approval pf PS&E and construction aware, attend up to two council meetings, and provide graphics and presentation support to help build public understanding and support for the project if requested.

Cost control and documentation will be a priority throughout the project. Iteris will maintain a running record of project costs by participating agency to facilitate accurate billing and will track all scope changes or deviations from the approved application to support Semi-Annual Review (SAR) submissions. Iteris will ensure that all administrative items required for OCTA reporting, both funding and project progress, are prepared and maintained throughout project delivery and for project closeout.

Deliverables:
• Two-Stage Project Kick-off Meeting agencies, meeting materials, and minutes • Draft and Final Detailed project budget and schedule by work tasks • Monthly invoices and progress reports, including Cost Changing Scope Change Log • File-sharing portal on Iteris Platform for easy access to documents • Close-out and other documentations as per OCTA and participating agency requirements

Task 2 – Data Collection and Field Review
Given that Iteris is already working with OCTA and participating agencies to retime 51 intersections as part of the Countywide Baseline Signal Synchronization project, the scope of the signal timing effort will be streamlined to focus on the retiming of the seven (7) Caltrans intersections along the project corridor, as specified in RFP . This results in minimal coordination requirements, primarily involving direct engagement with Caltrans and the corresponding agency to facilitate the execution of the Cooperative Agreement.

Demonstrating our proactive approach, Iteris staff has already conducted a preliminary field reconnaissance, surveying existing conditions, including cabinet configuration and communication infrastructure. This hands-on assessment ensures a deeper understanding of site-specific challenges and positions Iteris to hit the ground running, expediting project execution with minimal disruptions.

Subtask 2.1: Data Collection
Iteris will review the Average Daily Traffic (ADT) data for the State College Boulevard corridor collected during the Baseline project to identify proposed peak periods for turning movement count collection. This review will also include vehicle classification counts to determine heavy vehicle percentages. For Caltrans signals, the peak periods for turning movement counts will align with the peak periods previously identified through the Baseline effort, ensuring consistency with established analysis and existing traffic patterns. 1 2

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 19

F| SCOPE OF SERVICES & SCHEDULE

Iteris will work with the traffic count firm to conduct weekday and weekend peak period turning movements at the Caltrans intersections as per the requirements of this RFP. Iteris will coordinate with Caltrans to gather existing signal as-built plans, timing, and signal priority preferences, including LPI, timing sheets, phase sequences, conditional service, ring-barrier logic, etc.

Subtask 2.2: Field Review
After the initiation of the project, each study intersection and controller cabinet along the corridor will be thoroughly inventoried to document existing traffic signal hardware and ITS equipment. In addition, we will open the existing pull boxes to verify conduit sizes and evaluate conduit capacity; document existing utilities or markings that can be captured through visual investigation. This is a crucial step as several intersections along the corridor will require installation of new cable in existing conduit for video detection, CCTV, and fiber optic communications.

Iteris understands that the existing conduit size is often an unknown quantity; based on the sizes of existing conduits and available fill, we will identify sections of conduit that are recommended for replacement. Our comprehensive field reviews will be documented in a detailed report outlining key findings, planned and programmed improvements, and any additional equipment needs due to potential compatibility issues between existing and new devices. The report will also propose cost-effective solutions to ensure efficient implementation of the necessary work.

The Iteris Team recently conducted a field reconnaissance for non-Caltrans intersections on the project corridor. The field data gathered was summarized in an OCTA-approved format. Data included Traffic Signal cabinet components, intersection phasing operations, intersection geometries, bike and pedestrian control, railroad crossing control, adjacent land uses, and photos of the traffic signal equipment and the intersection. A snapshot of our field review data is shown in the following figure and table. Iteris will obtain a Caltrans Encroachment Permit prior to conducting cabinet inventories at Caltrans's seven locations.

As previously shown in Figure 2, additional field observations and potential mitigation measures have been identified in comparison to the proposed improvements outlined in RFP Appendix 1, Attachment B.

Iteris will proactively coordinate with utility companies to identify potential conflicts related to new conduit and cabinet installations during both design and construction. We will request a utility plan at the outset to integrate it into our design process. As usual, a Utility Notification Log will be maintained, ensuring efficient conflict resolution and seamless implementation.

Subtask 2.3: ‘Before’ Travel Time Studies
Iteris will conduct a travel time and delay “Before” Study along the project corridor using the floating car method and GPS-based Tru-Traffic Version 10.0 software. the Iteris team will plan to conduct the travel runs for 58 intersections along the corridor, including seven (7) Caltrans intersections as part of this project. Prior to performing travel time runs, Iteris will review the existing time-based coordination schedule and existing ADT counts at the Caltrans intersections. A minimum of five (5) runs will be collected in each direction to obtain a statistically valid estimation. The “Before” study run schedule will be coordinated with the timing AGENCY
# OF

SIGNALS CONTROLLER SOFTWARE CABINET FO TRUNK
Brea 10
Econolite ASC/3
Trafficware 900ATC ASC/3 Type M/P 72SMFO
Fullerton 13 Siemens M50 SEPAC Type P 72 SMFO
Anaheim 21
Safetran 2070E
Siemens 2070 ATC ASC/3 Type P/332 24SMFO
Orange 7
Econolite ASC/3
Econolite Cobalt ASC/3 Type P 72 SMFO
Caltrans* 7
* Caltrans cabinets cannot be field reviewed without an Encroachment Permit

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 20

F| SCOPE OF SERVICES & SCHEDULE

implementation and fine-tuning phases of the Countywide Baseline Project, as most corridor signal timing upgrades will be completed as part of the OCTA Countywide Baseline Project.

The “Before” study will assist in identifying further operational deficiencies and queuing conditions along the corridor while also establishing a baseline for the existing conditions as quantified by Measure of Effectiveness (MOE) and Corridor Synchronization Performance Index (CPSI).

A summary report presenting Iteris’ findings (including MOE results and CSPI quantification) from the “Before” study will be provided to all participating agencies in a technical memorandum.

Subtask 2.4: ‘After’ Travel Time Studies
Following the Primary Implementation phase, Iteris will conduct a travel time and delay “After” study using the same methodology as the “Before” Study. The same MOE and CSPI data will be collected and analyzed to evaluate the improvements resulting from the project implementation. A summary report comparing the results of the “Before” and “After” Studies, with reference to the MOE results and CSPI qualification, will be provided to all participating agencies.

Deliverables:
• Reports on Data Collection, Field Review, and Utility Research • Report and Presentation of the ‘Before’ and ‘After’ study comparison

Task 3 – System Design and Construction
Subtask 3.1: Design Plans
Upon final agreement on project refinements with the City of Anaheim and participating agencies—established through two kick-off meetings utilizing collaborative review, stakeholder input, and iterative technical discussions to refine the scope—Mr. Andrew Freeman, Task Lead, will initiate the detailed design phase. This phase will include 60%, 90%, and final (100%) design submittals, ensuring the project remains on schedule for timely implementation. During the course of project refinements, Iteris will determine and finalize the appropriate level of design detail, ranging from full-fledged design plans to sketch-level drawings and/or tabular documentation, as appropriate. Typically, full design plans are required for VDS system upgrades, while other ITS improvement designs may be developed in accordance with the City’s retrofit requirements and agency preferences. All design plans will be prepared using AutoCAD for all agencies, ensuring compatibility with each agency’s standards. To mitigate long lead times, particularly for traffic signal cabinets, we recommend beginning the equipment procurement process as early as 60% design stage, pending City approval. The final design will incorporate critical infrastructure upgrades – such as conduit installation, fiber optic interconnect, Ethernet switches, ATC controllers, CCTV cameras, Vehicle Detection Systems (VDS), EVP, RSU, and cabinet replacement – to enhance corridor-wide traffic management and future-proof the system for evolving transportation needs.

Leveraging City-provided data and a comprehensive field review of the corridor, Iteris will develop detailed design plans, specifications, and cost estimates for upgrades to traffic signal control systems, communication hardware, and software. Our approach ensures the project meets current needs while supporting a resilient, future-ready infrastructure capable of integrating critical systems such as Fire Department operations and citywide IT networks.

The design will comply with each agency’s standards and include communication schematics and fiber splicing details to ensure seamless system integration. Iteris’ familiarity with agency requirements and experience delivering similar projects will ensure compliance with all applicable standards. Initial cost estimates for equipment and construction will be prepared and refined during the design and procurement phases.

Throughout this process, Iteris will collaborate with all participating agencies to identify potential cost savings and explore opportunities for optimizing the project budget. Example of design plans for the Anaheim improvements, such as one shown in the next page, showcases notable upgrades, including transitioning from copper to fiber communications.
3 State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 21

F| SCOPE OF SERVICES & SCHEDULE

Additional pertinent items to focus on are listed as
follows:
• CCTV cameras will be installed on the pole
closest to the signal controller cabinet to
minimize pulling CCTV cable through existing
conduits. Iteris will verify CCTV locations for
optimal locations prior to design.
• Conduct proofing of existing conduit conditions
prior to design
• New controller cabinets with existing/new
foundation will require SCE coordination
• New fiber cable strand designation at each
location will be discussed with each
participating agency
.

Subtask 3.2: Bid Support
Iteris will support the bidding phase by leading pre-proposal meetings, responding to RFI’s, issuing addenda, and analyzing bids to ensure a smooth, transparent, and compliant procurement process.

Subtask 3.3: Construction Engineering and Management
Following design completion and award, Iteris will provide comprehensive construction support services, including oversight of system installation, review of RFIs and submittals, and addressing design-related questions or adjustments required due to field conditions. Iteris will be available for coordination meetings and provide engineering support throughout construction as needed.

Prior to construction, Iteris will attend a stakeholder preconstruction meeting to review planned activities, phasing strategies, and measures to minimize delays. To further reduce schedule risks, Iteris can assist with early procurement of long-lead items such as fiber optic cable, a proven approach that has successfully mitigated delays on past projects.

During construction, Iteris will support the Cities inspector in supervising installation to ensure compliance with design specifications and provide updates to the City on progress. Technical oversight will include system integration tasks such as connectivity to the Traffic Management Centers (TMCs), configuration of IP devices, and verification of bandwidth and latency requirements for reliable network performance. Iteris will configure VLANs, switches, controllers, cameras, and detection systems, ensuring the communication network is optimized for current needs and scalable for future expansion.

To document existing conditions, pre-construction photographs will be taken of all equipment and associated infrastructure. These photographs will serve as a baseline for identifying any damage or discrepancies during construction. If any design modifications or changes arise during construction, Iteris will act as an extension of the City to review, negotiate, and communicate changes with the contractor, and will coordinate with partner agencies for review and approval. This approach ensures transparency and keeps all stakeholders informed of any updates. Additionally, Iteris will coordinate with the inspector and City staff to conduct the final walkthrough and develop the final punch list, including establishing a schedule for completion of all items. Iteris will monitor progress and follow through with the contractor to ensure all punch list items are fully completed.

Subtask 3.4: As-Built Records
Upon completion of construction and after acceptance by the owning agencies, Iteris will conduct a field walk to verify the installed improvements and document any deviations from the original design. Finally, Iteris will update the As-built drawings to reflect the final conditions. These As-built drawings will be provided in both electronic (AutoCAD and PDF format) and hard copy (36”x24” set on mylar for Cities records and bond paper for each partner agency) formats, ensuring comprehensive and accurate recordkeeping.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 22

F| SCOPE OF SERVICES & SCHEDULE

Deliverables:
• 60%, 90%, final 100% PS&E
• As-built recording (in both electronic and hard copy formats) • Pre-construction meeting agenda and notes
• Construction progress meeting minutes
• RFI responses

Task 4 – Signal Timing and Optimization
Optimizing signal timing along the project corridor is essential to improve traffic flow, reduce delays, and enhance overall corridor efficiency. Under this project, Iteris will focus on developing and implementing optimized signal timing plans for seven (7) Caltrans intersections included in the RFP .

We will utilize the OCTA Baseline Synchro network that we have already developed to analyze existing conditions, identify operational challenges, and develop optimized timing plans tailored to Caltrans’ standard and coordination requirements.

To ensure an effective approach, Iteris will conduct preliminary field observations and present optimization concepts at the kick-off meeting to gather input from Caltrans and other stakeholders. By incorporating agency feedback, we will refine timing strategies that align with Caltrans’ operational objectives while improving coordination with the surrounding signalized network.

Signal timing development and implementation will be conducted using Synchro, SimTraffic and Tru-Traffic modeling tools. For the seven Caltrans-owned intersections, Iteris will build upon the Synchro network developed for the Baseline Project to optimize and implement signal timing plans. This model will be calibrated to reflect real-world conditions and will serve as the foundation for signal timing optimization. Key considerations for timing adjustments will include:
• Cycle length optimization to balance progression along State College Boulevard - The City Drive RTSSP while minimizing delays on the ramps
• Phase and pedestrian timing adjustments in accordance with California MUTCD guidelines and Caltrans’ clearance interval policies
• Queue management strategies to prevent spillback onto freeway ramps and ensure smooth merging operations
• Time-of-day coordination plans to accommodate peak-period traffic variations Based on the traffic data obtained and the ClearGuide data collection feature, we are confident that no additional field traffic counts will be necessary for these seven Caltrans signals, resulting in cost savings for the project. Our existing data and field verification will be sufficient for the development and implementation of the proposed timing plans.

Following the development and approval of the optimized timing plans, Iteris will coordinate with Caltrans and the City to implement the new timing parameters. Based on current understanding, Caltrans signal timing will be implemented directly in the field by Caltrans staff. Implementation will occur at the local controllers, subject to site conditions and Caltrans preference.

After implementation, field fine-tuning will be conducted over a three-week period to ensure proper operation under real-world traffic conditions. Adjustment will be made as necessary, and final timing plans will be documented for the City’s and Caltrans’ records.

Deliverables:
• Optimized signal timing plans for the seven Caltrans intersections • Implementation and fine-tuning of timing adjustments
• Synchro, SimTraffic and Tru-Traffic models for existing and optimized conditions • Technical memorandum documenting findings and final timing plans 4 State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 23

F| SCOPE OF SERVICES & SCHEDULE

Task 5 – Primary Implementation Project Report
At the end of the PI phase, Iteris will prepare a comprehensive Project Report summarizing the project scope, objectives, findings, and recommendations. It will include collected data, travel time studies, measurable fuel savings, as well as detailed intersection configurations, signal timings, and system improvements. The report will also outline planned enhancements, and cost-benefit estimates for further infrastructure upgrades. Iteris will present the report to Anaheim and partner agencies, ensuring compliance with CTFP Guidelines. After incorporating agency feedback, the final report and appendices will be submitted in electronic and hard copies. A concise Project Summary Sheet will also be provided for use in presentations to elected officials. To conclude the PI phase, Iteris will obtain agency approvals, confirm payments to vendors and subconsultants, and formally request the release of retention funds.

Deliverables:
• Draft and Final Project Report

Task 6 – Project Management – O&M Phase
Upon receiving written approval from all agencies for completion of the PI tasks, Iteris will initiate the O&M phase. Ms. Naree Kim will continue to lead this phase, ensuring consistent service through meeting coordination, progress reports, invoicing, and scheduling throughout the O&M phase duration.

Deliverables:
• Monthly invoicing and O&M schedule

Task 7 – Continuing Support
For 24 months following the PI phase, Iteris will conduct monthly travel time runs along the corridor during peak periods and a Saturday using ClearGuide to monitor traffic conditions. Iteris will document travel times, stops, and key corridor conditions, providing monthly summaries with performance trends and recommendations for improvement. Additionally, intersection reviews will be completed within 24 hours of a request, and system improvement evaluations will be conducted within 48 hours. Findings and necessary repairs will be promptly reported to the agencies.

Deliverables:
• 24 months of on-call support
• Monthly memorandum with comparisons from the field and ATSPM

Task 8 – Final O&M Report
At the conclusion of the 24-month O&M Phase, Iteris will submit a Final O&M Report detailing all procedures and actions taken during this phase. The report will include monthly travel time run results, along with key corridor observations. It will also summarize all modifications made during the 24-month period and offer recommendations for additional signal system upgrades or low-cost infrastructure improvements along the study corridor. Iteris will provide Anaheim with all necessary documentation to assist in the efficient closure of the project, in compliance with the CTFP guidelines.

Deliverables:
• O&M Technical Memorandum
• Final and Close-out Documentation
5 6
7 8

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 24

F| SCOPE OF SERVICES & SCHEDULE

Preliminary Project Schedule
Iteris has provided a preliminary project schedule/timeline as shown in Figure 5. We fully understand that a project schedule is dynamic and will need to be refined by the requirements of the lead agency.

Figure 5 – Preliminary Project Schedule

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 25

F| SCOPE OF SERVICES & SCHEDULE

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 25

3| FEE SCHEDULE

As required by the RFP and ADDENDUM NO. 1 - Q&A, the 5 hard copies sent to the City included this section with the following:
• The total number of proposed bill hours by each individual • Estimate and description of maximum reimbursable expenses by each individual • The hourly rate of each individual
• The maximum estimate number of billed hours per individual • Projected final cost per task
However, to comply with the OpenGov.com portal, this section has been moved to the Cost Summary section in the electronic version only.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 26

3| FEE SCHEDULE

APPENDIX 2 – Conflict of Interest Form
C
onflict of Interest Form for Consultants
(Consultant to complete, sign and submit with the RFWOP Submittals) T
he Political Reform Act (Government Code Sections 81000- 91014) and Government Code Section 1090 prohibit any Anaheim public official, officer, or employee from involvement in a governmental decision or contract in which he or she has a financial interest. It is the responsibility of the consultant, consultant's employees, and subconsultants who perform work under the consultant agreement to evaluate any potential conflict of interests and follow the provisions of the conflict of interest requirements as set forth in Section 23 of the consultant agreement. Be advised that a prohibited conflict of interest may void any award where it exists.

I
, the undersigned, hereby certify that I have reviewed and understand the above paragraph, and in furtherance of the foregoing, I have evaluated and caused my company's employees and subconsultants to evaluate any potential conflict of interests. Based on this evaluation, I hereby further certify that no such conflict of interests exists.

S

IGNATURE OF AUTHORIZED SIGNATORY
_____________________________________ D
ate: ________________
P
rint Name: ___________________________
T
itle: _________________________________
C
onsultant Name: ____________________________________________ AP
PENDIX 2
Iteris, Inc.

Steven Bradley, PE
03/24/2026
Senior Vice President
APPENDIX 4 - DESIGNATION OF SUB-CONSULTANTS
Submit with Proposal
In compliance with the Provisions of Section 4100-4107 of the Code of the State of California, Labor Code Section 1771.1 and any Amendments thereto, the undersigned certifies that he has used the sub- proposals of the following listed sub-CONSULTANTS in making up his proposal, and that the sub- CONSULTANTS listed will be used for the work for which they proposed, subject to approval of the Engineer, and in accordance with the applicable provisions of the Request for Work Order Proposals. If the proposer does not submit the names and addresses of sub-CONSULTANTS, he shall be required to do the work with his forces. If no sub-CONSULTANTS are listed, all insurance shall be written in the name of the general contractor only, and any liabilities arising through the operation of a sub-contractor shall not be covered by the insurance.

Print clearly and complete ALL lines.

Item of Work

1. LG2WB
Engineers, Inc.
dba Linscott, Law &
Greenspan, Eng.

2. Sub-Consultant’s
Name

3. Sub-Consultant’s
Name
Complete Street Address
Phone No.

Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date
Item of Work
Complete Street Address
Phone No.

Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date
Item of Work
Complete Street Address
Phone No.

Email (for DIR input)
License No. Exp. Date
DIR Registration No. Exp. Date
Proposers may be considered NON-RESPONSIVE
if all information is not completely filled in.

PROPOSER'S NAME AUTHORIZED SIGNATURE
600 S. Lake Avenue, Suite 500 Pasadena, CA 91106
626-796-2322
1000054482 06-20-2027
[email protected]
PS&E, Construction Management, Integration
Steven Bradley, PE

Page 1 of 3 ends

Ci
ty of Anaheim

DEPARTMENT OF PUBLIC WORKS
201 S. Anaheim Blvd.

Suite 502
Anaheim, CA 92805
TEL: 714.765.5202
March 12, 2026

NOTICE TO ALL BIDDERS
RE:

State College Blvd/ The City Drive TSSP Project
Account N
os. 278-412-N860-7809
ADDEND
UM NO. 1 - Q&A

1. Question: Will the City please provide a copy of its standard Professional Services Agreement for Engineering Services?
Answer: The City will provide a sample agreement.

2. Question: The RFP specifies a 25-page proposal limit. To allow proposers to adequately describe the project team and relevant experience, would the City consider excluding staff resumes from the page limit?
Answer:

The resumes of key personnel should be included within the Proposal.

Full resumes of staff can be included as an attachment, which does not count against the 25-page proposal limit.

3. Question: Can we include projects completed from the sub consultant or does it have to be solely projects that the Prime has completed.

Answer:

Yes, you can include projects completed by your sub consultant.

4. Question: Does the physical cost proposal need to submitted separately from the Technical proposal or can they be combined in the same envelope? Answer:

Please submit the cost proposal in a separate envelope.

5. Question: The RFP specifies that proposals be submitted on single-sided 8.5” × 11” sheets, except for the Resource Hour Allocation Table, which may be on 11” × 17”. For improved readability of complex graphics, would the City consider allowing additional items such as the Project Schedule or other technical exhibits to be presented on 11” × 17” sheets, provided they remain within the overall page limit?
Answer:

Yes, the City will allow 11"x17" sheets for complex graphics to improve readability.

Page 2 of 3 ends

C
ity of Anaheim

DEPARTMENT OF PUBLIC WORKS
201 S. Anaheim Blvd.

Suite 502
Anaheim, CA 92805
TEL: 714.765.5202

6. Question: Should the Primary Implementation Project Report include the data and results from OCTA's Countywide Baseline Study?
Answer: Yes, the consultant shall coordinate with OCTA's Countywide Baseline Study in preparing the Primary Implementation Project Report.

7. Question: For the O&E corridor, travel time part, should we take the same approach as described before and after runs? If not, please clarify if 12-hour weekdays and 4-hour weekends mean 12 consecutive hours on a single day, once per month, driving by a single vehicle through the corridor.

Answer:

Typically, the consultant will drive the corridor during the timing plan hours for a weekday and a weekend. For example, if Weekday hours are AM:
0700-0900; MD 1100-1300; PM 1630-1830, which totals 6 hours, then the monthly driving will be twice in a month (6 hours x2) and 4-hour on weekend (ie.1000-1400 Saturday).

8. Question: Could the City clarify the extent of surveying required—is topographic survey required for the entire corridor?
Answer:

A topographic survey is not required for the entire corridor.

9. Question: Can we list sub consultant’s projects under 1.d Relevant Project Experience in the proposal?
Answer:

Yes.

10. Question: Does the City have expectations for both the construction window and the overall project completion timeline?
Answer: The project schedule has to meet the CTFP guidelines. The City anticipates completing the project, including O&M, within 3 years.

11. Que
stion: Do both the detailed cost estimate and the total cost summary sheet count toward the page limit?
Answer: The detailed cost estimate counts toward the page limit, but the total cost summary as shown in Appendix 3 does not.

Type text here

Page 3 of 3 ends

City of Anaheim

DEPARTMENT OF PUBLIC WORKS
201 S. Anaheim Blvd.

Suite 502
Anaheim, CA 92805
TEL: 714.765.5202
THE PROPOSAL DUE DATE REMAINS THURSDAY, March 26, 2026
AT 2:00 P.M.

S
incerely,
Jane Keely

Project Manager
The cons
ultant shall acknowledge receipt of this addendum by signing and enclosing this form in his/her proposal package submittal. Failure to do so may result in a disqualification of this bid.

Signature Date
Company
March 24, 2026
Iteris, Inc.

State College Boulevard/The City Drive Regional Traffic Signal Synchronization Program Project Iteris, Inc. | 28

3| FEE SCHEDULE

•

Moving smarter, together.

Ms. Kim serves as Associate Vice President for Iteris’ Mobility Consulting Services with prior leadership experience at Iteris, returning with expanded expertise in Intelligent Transportation Systems (ITS) and transportation engineering gained over four years in the industry. She has over 23 years of experience in planning, design and implementation of traffic engineering and Intelligent Transportation Systems (ITS). Ms Kim has served as Project Manager on numerous traffic and ITS design/construction, traffic signal timing and synchronization, operational analysis, feasibility studies and municipal traffic engineering projects. Her traffic engineering design expertise includes traffic signal installation, signal modification, roadway signage/striping, street lighting, and worksite traffic control and neighborhood traffic management. Ms. Kim’s ITS experience comprises fiber optic communications, wireless communication, Closed-Circuit Television (CCTV), Video-Detection System (VDS) and Dynamic Message Signs (DMS). Ms. Kim’s transportation planning expertise includes traffic impact studies, parking studies, transportation master plans, signal warrant analysis and stop warrant analysis.

PREVIOUS PROJECT EXPERIENCE – SMG

Orange County Transportation Authority (OCTA), Countywide Signal Synchronization Baseline Project- Orange County, CA In her previous firm, Ms. Kim served as Task Lead providing support for Iteris for Countywide Synchronization Baseline Project, a strategic effort to realign signal timing for over 2,500 intersections across Orange County. Iteris leveraged advanced analytics through ClearGuide® to assess signal performance, optimize timing plans, and enhance network efficiency. This project contributed to a data- driven approach reinforcing OCTA’s leadership in arterial management, emphasizing safety, sustainability, and emerging traffic technologies. The project began in March 2024 and is scheduled to be completed by February 2029.

EDUCATION
MS, Civil Engineering, University of Utah,
UT, 2003

BS, Civil Engineering, University of Utah,
UT, 2000

YEARS OF EXPERIENCE
With Iteris: 14 Total: 23

REGISTRATIONS
Civil Engineer (PE)
NV #022518, 2013

CORE DISCIPLINES
Traffic Engineering & Operations
ITS Planning & Design
ITS Operations & Management
ITS Systems Engineering & Architecture
Grant Application Support

AFFILIATIONS
Orange County Traffic Engineering
Council (OCTEC)
Institute of Transportation Engineers
(ITE)

NAREE KIM, PE

PROJECT MANAGER

NAREE KIM, PE

PROJECT MANAGER
Moving smarter, together.

Traffic Engineering On-Call Services - City of
Irvine, CA
Ms. Kim has served as the Project Manager for
Traffic Engineering On-Call services at her previous
firm since 2022. She assisted the City to develop
signing and striping plans for two segments, about
six (6) miles along Jamboree Road and Harvard
Avenue corridors, to enhance safety and traffic
circulation for all modes of traffic in compliance with the latest City’s Active Transportation Plan.

I
n addition, she provided grant application supports
for OCTA Call for Project P and Supplemental
Application for Irvine Boulevard – Trabuco Road
corridor from Old Myford to Marguerite Parkway.

The Project involved signal inventory, close
coordination and meetings with the participating
agencies, and final submittal including OC Fund-
Tracker upload and addressing comments.

Additionally, she provided various Traffic
Engineering Design Services for various fiber optic
upgrades and video detection upgrade projects. The
project began in June 2022 and her role on project
ended December 2025.

C
ity of Fontana Traffic Engineering On-Call
Services - City of Fontana, CA
Ms. Kim has served as the Project Manager for
Traffic Engineering On-Call services at her previous
firm since 2022. She assisted the city providing
various local municipal engineering services
including over 300 sets of traffic control plan check
reviews, SMART grant funding and program
management services, onsite staff augmentation and
vendor evaluation services for Asset Data
Management Systems. The project began June 2022
and her role on project ended December 2025.

P
ort of Long Beach On-Call Engineering
Services - Port of Long Beach, CA
Ms. Kim has served as the Project Manager for
Traffic Engineering On-Call services at her previous
firm. She assisted the technical team to deliver
various projects for the Port of Long Beach including
Heavy Haul Route Design and providing staff
augmentation services. Services included traffic
signal plans, signing and striping plans, traffic
phasing/control plans, street lighting plans,
Transportation Management Plan (TMP), Basis of
Design Report, Specifications, cost estimation, and
scheduling. Additionally, she provided the similar
services for the plan check review for West Shoreline
Realignment project. The project began January
2022 and her role on project ended December 2025.

I-710 Integrated Corridor Management (ICM)
Concept of Operations (ConOps), Development
and System definition and Design, Los Angeles
County Metropolitan Transportation Authority
(LA Metro) – Los Angeles County, CA
Ms. Kim served as the Principal Engineer on this
project at her previous firm under Highway Program
Project Deliver Support Services On-Call for the LA
Metro.

As part of this Task Order 19, her team helped LA
Metro, Caltrans District 7, and 13 local agencies to
develop the I-710 ICM ConOps, System Engineering
and detailed design for corridor i mprovements. She
supported stakeholder engagement meetings and
worked closely with 13 local jurisdictions along the
corridor for detailed design PS&E development. The
project successfully completed the PS&E bi d package
in December 2023, currently under construction.

I-105/I-405 Integrated Corridor Management
(ICM) Concept of Operations (ConOps),
Development and System definition and Design,
Los Angeles County Metropolitan Transportation
Authority (LA Metro) – Los Angeles County, CA
Ms. Kim served as the Principal Engineer on this
project at her previous firm under Highway Program
Project Deliver Support Services On-Call for the LA
Metro.

As part of this Task Order 20, her team helped LA
Metro, Caltrans District 7, and six (6) local agencies to develop the I-105/I-405 ICM ConOps, System
Engineering and detailed design for corridor
improvements. The project is currently on the bid
packaging process. Advanced Transportation
Management Systems The project began January
2024 and her role on project ended December 2025.

Moving smarter, together.

Mr. Li serves as a Vice President of Iteris’ Mobility Consulting Services and has been with the firm since 2010. He has 38 years of experience in providing professional services in planning, design and implementation of traffic engineering and Intelligent Transportation Systems (ITS). Mr. Li has served as Project Manager or Principal-in- Charge on numerous traffic and ITS design/construction, traffic signal timing and synchronization, operational analysis, feasibility studies and municipal traffic engineering projects. His traffic engineering design expertise includes traffic signal installation, signal modification, roadway signage/striping, street lighting, and worksite traffic control and neighborhood traffic management. Mr.

Li’s ITS experience comprises fiber optic communications, wireless communications, Closed-Circuit Television (CCTV), Video-Detection System (VDS) and Dynamic Message Signs (DMS). He is also highly experienced in traffic signal operations, having assisted numerous agencies in the analysis, retiming, and synchronization of traffic signals, both corridor and network wide. Mr. Li’s transportation planning expertise includes traffic impact studies, parking studies, transportation master plans, signal warrant analysis and stop warrant analysis. He has served as City Traffic Engineering Consultant for many agencies, helping to resolve numerous day- to- day traffic engineering issues, including resident inquiries, plan checking, and safety evaluations.

PROJECT EXPERIENCE

Orange County Transportation Authority (OCTA), Countywide Signal Synchronization Baseline Project - Orange County, CA Mr. Li serves as Project Manager to OCTA to support the $10M Countywide Signal Synchronization Baseline Project, a strategic effort to realign signal timing for over 2,500 intersections across Orange County. Iteris leveraged advanced analytics through ClearGuide® to assess signal performance, optimize timing plans, and enhance network efficiency. This project contributed to a data - driven approach reinforcing OCTA’s leadership in arterial management, emphasizing safety, sustainability, and emerging traffic technologies. The project began in March 2024 and is scheduled to be completed by February 2029.

EDUCATION
BS, Electrical Engineering, University of
Southern California, Los Angeles, 1988

YEARS OF EXPERIENCE
With Iteris: 15 Total: 38

REGISTRATIONS
Electrical Engineer (EE)
CA # 14842, 1995
AZ # 37241, 2002
NV #21200, 2011
Traffic Engineer (TE)
CA # 1763, 1993
Professional Traffic Operations (PTOE)
PTOE # 214, 2000

CORE DISCIPLINES
Traffic Engineering & Design
Signal Timing & Coordination
Traffic Signal Operations
Signal System Selection & Deployment
ITS Planning & Design
ITS Systems Engineering
Traffic Simulation & Transportation
Planning
Municipal Traffic Engineering

AFFILIATIONS
Institute of Transportation Engineers
(ITE)
ITS California
Orange County Traffic Engineering
Council (OCTEC)
BERNARD K.

LI, EE, TE, PTOE

PRINCIPAL-IN-CHARGE

BERNARD K. LI, EE, TE, PTOE

PRINCIPAL-IN-CHARGE

Moving smarter, together.

Euclid Street Corridor Project Regional Traffic
Signal Synchronization Program (RTSSP – City of
La Habra, CA
Mr. Li serves as the Principal-in-Charge and QA/QC
Manger on this signal synchronization project for City
of La Habra. Project includes the synchronization of
sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra,
Fullerton, Anaheim, Garden Grove, Santa Ana, and
Fountain Valley along Euclid Street. Iteris is providing communication system analysis for the City of Fullerton and the City of Santa Ana through this project. Iteris
will conduct all engineering, construction management,
inspection, and administrative tasks necessary to
complete the project. After the construction and
implementation phase of the project, Iteris will provide operations and maintenance services for three years.

The project began in March 2023 and is expected to be
completed March 2028.

Main Street Regional Traffic Signal
Synchronization Project (RTSSP), Orange County
Transportation Authority (OCTA) – Orange County,
CA
Mr. Li serves as the Project Manager of a $3.6 million
regional traffic signal synchronization project extending through the Cities of Orange, Santa Ana, and Irvine in
Orange County, California. The project includes signal
coordination and timing improvements, with the aim of
improving traffic flow, enhancing public safety, and
decreasing stops along 12 miles of the Main Street
corridor upgrading 67 intersections. The primary goal of this project is to deploy new ITS equipment and
communication infrastructure to support the
management of the cities’ transportation network,
implement optimized coordination timing plans to
achieve optimal traffic flow, and improve safety for all road users, including vehicles, buses, bicycles, and
pedestrians. As part of this project, Iteris’ SPM was
implemented to deliver proactive monitoring of traffic
signal operations at all project intersections. The result of our signal synchronization effort has resulted in a
benefit/cost (B/C) ratio of 14:1 within the first year. The project began April 2019, and the O&M phase was
completed in June 2023.

Warner Avenue Regional Traffic Signal
Synchronization Projects (RTSSPs) – OCTA,
Orange County, CA
Mr. Li serves as Project Manager twice (2012 to 2015, and 2022 to present) to provide ITS upgrade design/build and traffic signal synchronization improvements along
Warner Avenue, a major east-west arterial, from Pacific Coast Highway to Pullman Avenue. The corridor
encompasses a total of 43 signals, covering 13 miles of roadway, crossing the Cities of Huntington Beach,
Fountain Valley, and Santa Ana. The first project, which started in 2012, was funded by the Renewed Measure M
(aka M2), while the second project, started in 2022 with a value of $4.4 million, was funded by both M2 and Senate Bill 1 (SB1). For both projects, numerous ITS equipment upgrades were provided, including fiber-optic
communications, Closed-Circuit Television (CCTV), video detection systems (VDS) signal controllers and cabinets.

The current project also includes implementation of
ClearGuide arterial performance measure (APM) and
signal performance measure (SPM). In addition, both
projects also include synchronization of all 43
intersections along the corridor with AM, PM, mid-day,
off-peak and weekend traffic signal coordination timing plans. The first project began in August 2012 with new
coordination timing implemented in June 2013, and
resulted in a B/C ratio of 14:1. Operations and
Maintenance (O&M) was provided through May 2015.

The second project began in January of 2022 and will
be completed June of 2026.

Bristol Street Regional Traffic Signal
Synchronization Project (RTSSP), Orange County
Transportation Authority (OCTA) – Orange County,
CA
Mr. Li served as the Project Manager to OCTA to provide traffic signal/ITS equipment upgrade and signal
synchronization along the Bristol Street corridor. This project consists of 45 study intersections along a 10-mile stretch in the cities of Santa Ana, Costa Mesa, Newport Beach, and Caltrans. Fiber-optic cables were installed at various segments of the corridor to close the
communication gap. Many intersections were also
upgraded with new controllers, cabinets, service,
emergency vehicle preemptions and Closed-Circuit
Television (CCTV). AM, mid-day, PM and weekend
coordination timing plans were implemented. Based on
the before/after studies results, the project has a
Benefit-to-Cost (B/C) ratio of 11:1. The project began in June 2015 and completed in June 2018. A 2-year
Operations and Maintenance (O&M) period completed
in June 2020.

Moving smarter, together.

Mr. McNeill serves as a Principal Engineer for Iteris’ Mobility Consulting Solutions and has been with the firm since 2017. He is a registered professional Civil Engineer and Traffic Engineer with 16 years of experience working in the fields of transportation engineering and planning. Mr. McNeill has delivered PS&E packages for traffic signal system upgrades, fiber optic communication networks, freeway traffic management systems, as well as other traditional traffic handling, signing and pavement delineation plans.

He has also managed signal timing development and
implementation for several agencies. He provides solutions to traffic problems while effectively managing budgets and scope of work.

Mr. McNeill is committed to providing sustainable transportation design with an emphasis on systems engineering analysis and utilization of emerging technologies. His software experience includes Autodesk AutoCAD, Microsoft Excel, Microsoft Power Point, Microsoft Word, Microsoft Visio, Microstation V8i, Synchro (Trafficware).

PROJECT EXPERIENCE

I-405 Design-Build Improvement Project, Orange County
Transportation Authority (OCTA) – Orange County, CA
Mr. McNeill is serving as Electronic Toll and Traffic Management (ETTM) System Infrastructure Design Lead for Iteris, acting as a subconsultant of a multidisciplinary design and construction team, on this $1.2 billion dollar design build project in Orange County California. The project will improve 16 miles of the I-405 between the SR-73 freeway in Costa Mesa and the I-605 near the Los Angeles County line. The project includes adding one regular lane in each direction from Euclid Street to I-605, making improvements to freeway entrances, exits and bridges, and will also implement Express Lanes that expands the existing HOV lane from one lane to two lanes in each direction from SR-73 to I-605. Iteris is responsible for the design of the Caltrans ITS field infrastructure, temporary ITS field infrastructure supporting maintenance of traffic during construction, toll system infrastructure and coordination, street lighting, agency traffic signal improvements along the corridor and development of the project Traffic Management Plan. The project began in January 2017, and construction was completed October 2023.

EDUCATION
MS, Civil Engineering (Transportation
Systems), University of California, Irvine,
2012

BS, Civil Engineering, University of
California, Irvine, 2008

YEARS OF EXPERIENCE
With Iteris: 8 Total: 16

REGISTRATIONS
Civil Engineer (PE)
CA #79151, 2011
UT #9480116-2202, 2015
Traffic Engineer (TE)
CA #2792, 2015
Professional Traffic Operations Engineer
(PTOE)
#4870, 2020
League Cycling Instructor (LCI)
#6087, 2018

CORE DISCIPLINES
Traffic Engineering
Transportation Planning
ITS Planning and Design

AFFILIATIONS
Institute of Transportation Engineers
(ITE)
Orange County Traffic Engineering
Council (OCTEC)
JOSHUA

MCNEILL, PE, TE, PTOE

QUALITY ASSURANCE

JOSHUA MCNEILL, PE, TE, PTOE

QUALITY ASSURANCE

Moving smarter, together.

Orange County Transportation Authority (OCTA),
Countywide Signal Synchronization Baseline
Project- Orange County, CA
Mr. McNeill serves as Support Staff for OCTA’s $10M
Countywide Signal Synchronization Baseline Project.

This project is a strategic effort to realign signal
timing for over 2,500 intersections across Orange
County. Iteris leveraged advanced analytics through
ClearGuide® to assess signal performance, optimize
timing plans, and enhance network efficiency. This
project contributed to a data-driven approach that
reinforces OCTA’s leadership in arterial
management, emphasizing safety, sustainability, and
emerging traffic technologies. The project began in
March 2024 and is on-going.

Valley View/Bolsa Chia Regional Traffic Signal
Synchronization Program (RTSSP) – City of
Huntington Beach, CA
Mr. McNeill serves as Project Manager on this traffic
signal synchronization project for the City of
Huntington Beach. The goal of this project is to
upgrade existing signal equipment and synchronize
signal timings along the corridor to improve traffic
flow and reduce congestion. This project includes ITS
design, bid support, construction support, traffic
signal synchronization services, and maintenance
services to 22 signals along Valley View Street/Bolsa
Chica Street for the Cities of Huntington Beach,
Westminster, and Garden Grove. Project started in
October 2023 and is scheduled to be completed
October 2026.

OCTA – Warner Avenue Traffic Signal
Synchronization Project – Orange County, CA
Mr. McNeill is serving as Traffic Signal Timing Lead
for the Warner Avenue Regional Traffic Signal
Synchronization Project, which entails traffic signal
improvements and synchronization. The corridor
encompasses a total of 43 signals, covering 13 miles
of roadway, crossing the Cities of Huntington Beach,
Fountain Valley, and Santa Ana. For both projects,
numerous ITS equipment upgrades were provided,
including fiber-optic communications, Closed-Circuit
Television (CCTV), video detection systems (VDS),
signal controllers, and cabinets. The current project
also includes the implementation of ClearGuide®
arterial performance measure (APM) and signal
performance measure (SPM). In addition, both
projects also include synchronization of all 43
intersections along the corridor with AM, PM,
midday, off-peak, and weekend traffic signal
coordination timing plans. This project began in
January of 2022 and will be completed June of 2026.

OCTA Main Street Regional Traffic Signal
Synchronization Projects (RTSSP), Orange
County Transportation Authority (OCTA) –
Orange County, CA
Mr. McNeill served as the Signal Timing Lead under
this project agreement, which provided services that
upgraded traffic signal electronics and
communications equipment, and optimize signal
timing along Main Street, a major north-south
corridor that comprises 67 major signalized
intersections. As part of the project, Iteris’
Intersection-as-a-Service™ end-to-end solution
offering delivered proactive monitoring of traffic
signal operations at all project intersections. The
primary goal of this project was to deploy new
Intelligent Transportation System (ITS) equipment
and communication infrastructure to support the
management of the city’s transportation network,
implement optimized coordination timing plans to
achieve optimal traffic flow, and improve safety for
all road users, including vehicles, buses, bicycles and pedestrians. The project began April 2019, and the
O&M phase was completed in June 2023.

Regional Traffic Signal Synchronization Program
(RTSSP) Project for Tustin Avenue - Rose Drive
– City of Orange, CA
Mr. McNeill serves as Signal Timing Lead on this
project. Under the project agreement, Iteris will
make infrastructure upgrades, signal coordination
and timing improvements, develop signal timing
plans for all signalized intersections along the
corridor, provide vehicle turning movement counts
and perform before-and-after corridor analysis along
the Tustin Avenue/Rose Drive corridor from First
Street in the City of Tustin to Wabash Avenue in the
City of Yorba Linda. The project area comprises 54
signalized intersections spanning six cities – Tustin,
Santa Ana, Anaheim, Orange, Placentia, and Yorba
Linda – as well as key highway on/off ramps under
Caltrans, in Orange County, California. The project
started in September 2021 and is ongoing.

Construction started in Summer 2023.

Mr. Andrew Freeman is a Senior Manager within Iteris’ Mobility Consulting Services division, bringing over 11 years of specialized experience in transportation and traffic engineering. His expertise includes project management, design, and construction support for a wide range of traffic infrastructure projects. Mr. Freeman’s area of expertise includes design and implementation of traffic signal systems, Intelligent Transportation Systems (ITS) improvements, and communication infrastructure. He is also highly experienced in the preparation and review of signing and striping plans. Mr. Freeman consistently brings a collaborative, detail-oriented approach to his work, supporting public agencies in achieving their mobility, safety, and operational goals.

PROJECT EXPERIENCE

Regional Traffic Signal Synchronization Program (RTSSP) Project for Tustin Avenue – Rose Drive – City of Orange, CA Mr. Freeman serves as Project Manager on this project. Under the project agreement, Iteris will make infrastructure upgrades, signal coordination and timing improvements, develop signal timing plans for all signalized intersections along the corridor, provide vehicle turning movement counts and perform before-and-after corridor analysis along the Tustin Avenue/Rose Drive corridor from First Street in the City of Tustin to Wabash Avenue in the City of Yorba Linda. The project area comprises 54 signalized intersections spanning six cities – Tustin, Santa Ana, Anaheim, Orange, Placentia, and Yorba Linda – as well as key highway on/off ramps under Caltrans, in Orange County, California. The project started in September 2021 and is currently in the O&M phase with an expected completion date of July 2026.

Yorba Linda Boulevard/Weir Canyon Road Corridor Regional Traffic Signal Synchronization Project- City of Yorba Linda, CA Mr. Freeman serves as Project Manager on this project. Under the project agreement, Iteris will make infrastructure upgrades along Yorba Linda Boulevard from Van Buren Street to new River Road in the City of Yorba Linda. Additionally, Iteris will analyze signal coordination and timing improvements, develop signal timing plans for all signalized intersections along the corridor, provide vehicle

EDUCATION
BS, Civil Engineering, University of Illinois
Urbana-Champaign, IL, 2014

YEARS OF EXPERIENCE
With Iteris: 2 Total: 11

REGISTRATIONS
Civil Engineer (PE)
IL #062.070815, 2018
Traffic Engineer (TE)
#3153
Professional Traffic Operations Engineer
(PTOE)
#4607, 2019

CORE DISCIPLINES
Traffic Engineering
Traffic Signal Design
Traffic Signal System Upgrades

AFFILIATIONS
Institute of Transportation Engineers
(ITE)

ANDREW FREEMAN,

PE (IL), TE, PTOE
DEPUTY PROJECT MANAGER / TASK 3 LEAD

ANDREW FREEMAN, PE(IL), TE, PTOE

DEPUTY PROJECT MANAGER / TASK LEAD

Moving smarter, together.

turning movement counts and perform before-and-
after corridor analysis on Yorba Linda Boulevard
from State College Boulevard in Fullerton to Canyon
Drive in Anaheim. The project began in 2023 and is
currently under construction with an expected PI
phase completion date of June 2026.

Valley View/Bolsa Chia Regional Traffic Signal
Synchronization Program (RTSSP) – City of
Huntington Beach, CA
Mr. Freeman serves as Project Engineer on this
traffic signal synchronization project led by the City
of Huntington Beach. The project involves upgrading
existing traffic signal and communication equipment
to support the deployment of updated synchronized
signal timing plans. These improvements are
designed to enhance traffic flow and reduce
congestion along the corridor. This project includes
ITS design, bid support, construction support, traffic
signal timing updates, and maintenance services for
22 signals along Valley View Street/Bolsa Chica
Street for the Cities of Huntington Beach,
Westminster, and Garden Grove. This project began
in October 2023 and is scheduled to be completed
by October 2026.

On Call Traffic Engineering Plan Check and
Construction Support Services – City of Orange,
CA
Iteris provides on-call traffic engineering plan review and construction support services to the City of
Orange. Under this contract, Mr. Freeman has been
assisting the City with the review and evaluation of
Traffic Control Plans and street improvement plans
for a major development project within the city. Mr.

Freeman is responsible for verifying that submitted
plans address previous City comments and comply
with applicable standards, including City of Orange
and Caltrans requirements, as well as federal
guidelines such as the California Manual on Uniform
Traffic Control Devices (CA MUTCD). He coordinates
closely with City staff and the developer’s design
team to monitor progress, resolve issues, and ensure
alignment among all stakeholders. In addition, he
identifies and monitors potential impacts to traffic
operations that may require temporary signal timing
adjustments during construction. These timing
modifications will be coordinated among the
construction contractor, Iteris, and the City to
minimize disruptions. This work began in March
2023 and is currently ongoing.

Carson St ITS and City Hall Integration Systems
Engineering – City of Carson, CA
Mr. Freeman serves as the Project Manager for an
Intelligent Transportation Systems (ITS)
improvement project for the City of Carson. The
project involves developing Plans, Specifications, and
Estimates (PS&E) to utilize existing conduit and fiber
optic cable to connect nine traffic signals to the
City’s Traffic Management Center located at City
Hall. In addition to establishing fiber connectivity,
the project includes upgrades to traffic signal
controllers, CCTV cameras, video management
software, vehicle detection systems (VDS), Traffic
Management Center (TMC) equipment, Advanced
Traffic Management System (ATMS) components,
and fiber optic infrastructure such as cable, Ethernet
switches, and fiber distribution units (FDUs). This
initiative represents a key opportunity for the City of Carson to advance its smart city capabilities. It will
serve as a pilot corridor for future ITS and signal
improvement projects throughout the City. The
project began in March 2024 and is expected to be
completed in April 2026.

On-Call Traffic Engineering and Transportation
Engineering Services – City of Yorba Linda, CA
Mr. Freeman serves as the Project Manager and
primary point of contact for this on-call contract.

Under this agreement, Iteris provides a range of
traffic and transportation engineering services to the
City of Yorba Linda. Typical tasks include ITS design
and implementation along major corridors such as
Yorba Linda Boulevard and Rose Drive, traffic signal
design at key intersections, and development of
fiber optic communications to City facilities. The
contract also covers an inventory of existing traffic
signal and ITS equipment and assistance with
funding applications, such as the Traffic Signal
Synchronization Program (TSSP) through OCTA’s
Project P, which involves documentation,
scheduling, and interagency coordination
Moving smarter, together.

Mr. Herting serves as Senior Engineer for Iteris’ Mobility Consulting Services and has been with the firm since 2021. He has over 17 years of experience on a variety of transportation projects with an emphasis on multimodal traffic engineering, Intelligent Transportation Systems (ITS), and electrical/lighting design. Mr.

Herting has successfully completed projects for several different local municipalities, transit agencies, and state DOTs in both California and Nevada. As a project manager, he has experience in all aspects of the design process including coordination with key project stakeholders, development of PS&E, and construction support services. His project experience includes signing and marking, traffic control and traffic handling, traffic signal design, active transportation solutions, ITS field equipment installation design, communication systems (copper and fiber), lighting and photometric analysis, and electrical design.

PROJECT EXPERIENCE

I-405 Design-Build Improvement Project, Orange County
Transportation Authority (OCTA) – Orange County, CA
Mr. Herting is serving as QA/QC reviewer for Iteris, acting as a subconsultant of a multidisciplinary design and construction team, on this $1.2 billion dollar design build project. The project improves 16 miles of the I-405. Iteris is responsible for the design of the Caltrans ITS field infrastructure, temporary ITS field infrastructure supporting maintenance of traffic during construction, toll system infrastructure and coordination, street lighting, agency traffic signal improvements along the corridor and development of the project Traffic Management Plan. Mr. Herting has reviewed Iteris project design deliverables for the project to assist in the coordination and resolve conflicts between the different aspects of the overall construction project. The project began in January 2017 and is ongoing.

I-10 Broadway Curve Design-Build Improvement Project,
Maricopa Association of Governments (MAG) – Phoenix, AZ Mr. Herting is serving as the design lead for Iteris, acting as a subconsultant of a multidisciplinary design and construction team on this design build project.

EDUCATION
BS, Civil Engineering, Montana State
University, Bozeman, MT, 2008

YEARS OF EXPERIENCE
With Iteris: 4 Total: 17

REGISTRATIONS
Civil Engineer (PE)
AZ #76755, 2022
CA #84337, 2015
NV #022133, 2012

CORE DISCIPLINES
Intelligent Transportation Systems
Communication Systems
Traffic Engineering
Traffic Signal Design and Operations
Electrical Design
Lighting and Photometric Analysis
Transit and Active Transportation Design

AFFILIATIONS
Institute of Transportation Engineers
ITS California
BRIAN

HERTING, PE
TASK 2 LEAD

BRIAN HERTING, PE
TASK 2 LEAD

Moving smarter, together.

The project improves an 11-mile stretch of roadway
identified as a key commerce corridor through the
heart of Phoenix. Improvements include roadway
widening, collector-distributor road system,
modified connections between the I-10 and SR 143,
modified connections between the I-10 and US 60,
pedestrian/bicycle bridges, and sound and retaining
walls. Iteris is responsible for the development of
the Traffic Management Plan and Maintenance of
Traffic. The project began in January 2021 and is
ongoing.

East San Fernando Valley (ESFV) Transit
Corridor Project – Los Angeles County
Metropolitan Transportation Authority (Metro),
City of Los Angeles, CA
Mr. Herting serves as Project Engineer responsible
for the development of the traffic signal plans along
a new light-rail transit (LRT) Metro line through the
San Fernando Valley. Iteris is working with Metro to
produce preliminary 30% and 60% design plans for
the upcoming ESFV Transit Corridor LRT project. This
includes traffic signal design, interconnect, and a
traffic and train interface concept of operations plan, to best identify and target traffic-related elements as part of this project, which is located within a
congested and very highly traveled corridor in the
Valley.

Southwest Boulevard Complete Streets Project
– Rohnert Park, CA
Mr. Herting is serving as the transportation design
lead to develop plans for a complete streets project
in the City of Rohnert Park. The project aims to make
the Southwest Boulevard corridor more bicycle and
pedestrian friendly through the addition of
landscaped medians and protected bicycle lanes. Mr.

Herting’s responsibilities included street lighting
design for the newly implemented corridor. To
ensure lighting would be adequate for the street,
cyclists, and pedestrians, photometric calculations
were performed to determine light type,
configuration, and spacing.

PREVIOUS PROJECT EXPERIENCE

UC San Diego Medical Center Drive South and
Mesa Housing Pedestrian and Bike Bridge
Improvements, La Jolla, CA
Mr. Herting served as the traffic and electrical design lead for the Medical Center Drive South and Mesa
Housing Pedestrian and Bike Bridge improvements
project, which included the realignment and
widening of Medical Center Drive South and a new
pedestrian and bicycle overcrossing that spans the
natural canyon toward student housing from the
UCSD Medical Center. The project included a new
traffic signal with a pedestrian/bicycle scramble
phase for pedestrian and bicycle prioritization, the
use of Class II bike lanes, and street and pedestrian
scale lighting. Brian’s role included management of
the traffic and electrical design teams, traffic signal design, photometric analysis for lighting levels
throughout campus facilities including custom
“floating” style lighting along pedestrian and bike
bridge, electrical voltage drop calculations, load
analysis and panel schedule design, coordination
with UCSD for service utilization, development of
technical specifications for traffic and electrical
components, opinion of probable construction cost,
and construction support. The project has won
several awards including Outstanding Project of the
Year from APWA San Diego and ASCE San Diego.

City of Carlsbad Traffic On-call, Carlsbad, CA
Mr. Herting served as the contract manager to
provide professional traffic engineering services for
the City of Carlsbad. He was responsible for the
completion of several task orders for various
improvements including the following: updates to
the City of Carlsbad’s Growth Management Plan,
level of service analysis for all major arterial streets within Carlsbad, crosswalk improvements, traffic
signal design, traffic control plans, and lighting
analysis.

Moving smarter, together.

Mrs. Haas serves as an Engineer for Iteris’ Mobility Consulting Solutions and has been with the firm since December 2021. She has over 8 years of experience working in the fields of transportation engineering and planning. She has worked on a variety of project types including developing traffic design plans, traffic safety studies, signal timing optimization, operations analysis, and travel forecasting.

PROJECT EXPERIENCE

Orange County Transportation Authority (OCTA), Countywide Signal Synchronization Baseline Project- Orange County, CA Mrs. Haas serves as Support Staff for OCTA’s $10M Countywide Signal Synchronization Baseline Project. This project is a strategic effort to realign signal timing for over 2,500 intersections across Orange County. Iteris leveraged advanced analytics through ClearGuide® to assess signal performance, optimize timing plans, and enhance network efficiency. This project contributed to a data - driven approach that reinforces OCTA’s leadership in arterial management, emphasizing safety, sustainability, and emerging traffic technologies. The project began in March 2024 and is scheduled to be completed by February 2029.

Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP – City of La Habra, CA
Mrs. Haas serves as a Project Engineer on this signal synchronization project for City of La Habra. Project includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street. Iteris is providing communication system analysis for the City of Fullerton and the City of Santa Ana through this project. Iteris will conduct all engineering, construction management, inspection, and
administrative tasks necessary to complete the project. After the construction and implementation phase of the project, Iteris will provide operations, and maintenance services for three years. The project began in March 2023 and is expected to be completed March 2028.

EDUCATION
BS, Civil Engineering, University of
Maryland, College Park, 2017

YEARS OF EXPERIENCE
With Iteris: 4 Total: 8

REGISTRATIONS
Civil Engineer (PE)
CO #00065323, 2024
Traffic Engineer (TE)
CA #3091, 2023

CORE DISCIPLINES
Traffic Engineering
Transportation Planning
Transportation Systems Management &
Operations (TSM&O)
Operations & Maintenance (O&M)

AFFILIATIONS
Women’s Transportation Seminar (WTS)
Institute of Transportation Engineers
(ITE)

MICHELLE

HAAS, PE, TE
TASK 4,5,6,7,8 LEAD

MICHELLE HAAS, PE, TE
TASK 4,5,6,7,8 LEAD

Moving smarter, together.

Warner Avenue Regional Traffic Signal
Synchronization Project (RTSSP), Orange County
Transportation Authority (OCTA) – Orange
County, CA
Mrs. Haas serves as Associate Engineer on this project
in which Iteris is assisting OCTA with multi-
jurisdictional signal coordination for a 13.2-mile stretch of Warner Avenue. The project requires retiming of 41
signalized intersections along Warner Avenue from
Pacific Coast Highway in the City of Huntington Beach
to Pullman Street in the City of Santa Ana. Iteris
collected traffic count data to create Synchro models
that will help optimize and synchronize the signal
timing along Warner Avenue. Also included in the
scope of the project, Iteris will develop and implement new timing plans for the AM, midday, PM, and
Weekend peak periods. This project began in January
of 2022 and will be completed June of 2026.

First Street/Bolsa Avenue Regional Traffic Signal
Synchronization Project (RTSSP), Orange County
Transportation Authority (OCTA) – Orange
County, CA
Mrs. Haas serves as Associate Engineer on this project
in which Iteris is assisting OCTA with multi-
jurisdictional signal coordination for a 13.1-mile stretch of First Street/Bolsa Avenue. The project requires
retiming of 55 signalized intersections along First
Street/Bolsa Avenue from Bolsa Chica Street in the City of Huntington Beach to Newport Avenue in the City of
Tustin and 5 signalized intersections offset from the
corridor in the City of Santa Ana. Iteris collected traffic count data to create Synchro models that will help
optimize and synchronize the signal timing along First
Street/Bolsa Avenue. Also included in the scope of the
project, Iteris will develop and implement new timing
plans for the AM, midday, PM, and Weekend peak
periods. This project began in August of 2022 and is
expected to be completed in June of 2026.

Manhattan Beach Crosswalk Improvements
Project - City of Manhattan Beach, CA
Mrs. Haas served as Associate Engineer on this project
in which Iteris is assisting the City of Manhattan Beach with traffic design to improve existing crosswalks. Mrs.

Haas was responsible for the design of pavement
markings and signing, as well as the design of ADA
parking stalls. Mrs. Haas worked on the project from
January 2022. Project began August 2021 and expected
to be completed by December 2024.

Pasadena Traffic Management Center (TMC)
Staffing for Special Events - City of Pasadena, CA
Mrs. Haas serves as Associate Engineer on this TMC
staffing project for the City of Pasadena. She provided staffing support during specific special events at the
Rose Bowl, such as UCLA football home games. Iteris
serves as an extension of City Staff by monitoring
traffic in and out of the Rose Bowl in the TMC,
confirming that the appropriate event timing plans
were in operation as programmed, adjusting necessary
timing based on observations and as requested by the
field officers, and conducting other timing tasks as
directed by City Staff in between the inbound and
outbound peaks. Mrs. Haas worked on the project
from October 2022. Project started July 2015 and is
expected to be completed October 2024.

Lake Forest Traffic Signal Management On-Call
Services – City of Lake Forest, CA
Beginning in July 2021, Mrs. Haas serves as project
engineer to provide traffic signal operation and
management services to the City of Lake Forest. One of
the main duties of Iteris is to operate and maintain all the traffic signals within the City, including:

• Verify all timings are programmed correctly and
that all traffic signals are in good working order
• Review scheduled operations on the central traffic
signal system to automatically perform a variety of
maintenance tasks
• Report traffic signal problems and malfunctions to
the City’s signal maintenance contractor
• Assist the City in resolving traffic signal control
complaints
• Investigate and recommend to the City
improvements such as signal phasing, equipment
upgrades and significant timing adjustments
• Coordinate with contractors and modify signal
timings due to roadway construction.

Under the terms of the contract, Iteris is also delivering its ClearGuide® software that helps the City improve
safety and mobility by turning large amounts of
complex transportation data into insights for smart,
data-driven operations and planning decisions.

Felipe Ortega

Linscott, Law &
Greenspan, Engineers
2 Executive Circle
Suite 250
Irvine, CA 92614
T 949.825.6175
F 949.825.6173
www.llgengineers.com

Pasadena
Irvine
San Diego

Biography
Mr. Ortega is a ITS Director at Linscott, Law & Greenspan, Engineers (LLG). Mr. Ortega is an essential member of our team, not only because of his expertise in systems integration, but he is a valuable link to City and Agency staff. He trains engineering and maintenance staff in the use of system hardware and software (including newly installed traffic systems and TMC equipment). He also provides essential support for LLG clients, both onsite and remotely, in design implementation, purchasing consultation, and last -mile integration of signal systems, controllers and TMC hardware.

Mr. Ortega’s expertise in all facets of communications infrastructure, as well as his background in the installation and configuration of software and hardware for nearly every type of communications system in use throughout Southern California means LLG clients have a reliable asset when it comes to installation, configuration, advising and training staff in the use of these systems.

Areas of Expertise
- Communications Design Signal
Modification Design Review
- Coordination Timing Implementation
- Troubleshooting Traffic-Related
Equipment (Network, Controllers, and
Timing)
- Proficient in Traffic Management
Systems (Centracs, QuicNet,
Tactics, Intelight, Transuite)
- TMC Network Management & Ops.
- Interagency Communications

Relevant Project Experience
On-Call ITS Support Services – Mr. Ortega provides and manages ITS support services to Cities throughout Southern California: Costa Mesa, Fullerton, La Habra, Brea, Dana Point, Laguna Niguel, Huntington Beach, Westminster, Cypress, Rancho Cucamonga, Chino. Mr. Ortega has worked extensively with City engineers and technical staff to maintain, expand, troubleshoot, and repair traffic signal communications and control systems. Mr. Ortega is trained to identify traffic control system issues and flow problems and recommend improvements and adjustments accordingly.

Typically, Mr. Ortega is engaged to integrate and repair systems when other consultants and contractors cannot make things work. Mr. Ortega has worked hand -in-hand with Caltrans engineering and operati ons staff and developed master plans where Caltrans -controlled intersections were key components in the development of multi-jurisdictional coordination timing within these Cities. Mr. Ortega has also designed and installed various Intelligent Transportation System (ITS) elements including CCTV cameras, fiber optic communication systems, wireless interconnect systems, and serial or Ethernet based systems, as well as upgraded multiple central systems in the past, present and future.

Orange County RTSSP Projects: For the following RTSSP projects, Mr. Ortega was instrumental in providing system integration, design and signal timing support, and implementation. Signal hardware and software components installed by various RTSSP tasks included: upgraded signal controllers & Integration with the respective agency central systems to improve the infrastructure and signal timing and Ethernet network. Tasks included on-going support and maintenance of traffic signal communications along the project corridor and to central systems in the member cities.

City of Costa Mesa : OCTA RTSSP Adams Avenue, Sunflower Avenue, Placentia -Baker Street, Bear Street
City of Fullerton: OCTA RTSSP Funded: Yorba Linda, Malvern -Chapman, Gilbert -Idaho, Orangethorpe Avenue, Brea Boulevard, Commonwealth Avenue, Lemon Street, Placentia Avenue, currently working on Harbor Boulevard.

Subconsultant Support -
Senior Signal Systems
Specialist

Years of Experience:
29 years
Years with LLG Engineers:
6 years
Registration:

IMSA Transportation Center System
Specialist - Level I – CE _102877
IMSA Traffic Signal Senior Field
Technician - Level III – CE_102877

Professional Memberships:

ITE | IMSA | OCTEC

Felipe Ortega

Linscott, Law &
Greenspan, Engineers
2 Executive Circle
Suite 250
Irvine, CA 92614
T 949.825.6175
F 949.825.6173
www.llgengineers.com

Pasadena
Irvine
San Diego

City of Dana Point: Moulton-Golden Lantern RTSSP, Crown Valley Parkway RTSSP City of La Habra: La Habra Blvd -Central Ave-State College Blvd, Lambert Road, Imperial Highway RTSSP
City of Brea: Birch Street, Kreamer RTSSP
Orange County Transportation Authority : OCTA RTSSP La Paz Road, Alicia Parkway and Antonio Parkway/Orange County Traffic Management Center.

Antonio Parkway Project: The project was a collaborative effort between Caltrans, County of Orange, City of Rancho Santa Margarita, and OCTA, to construct a multi-agency shared advanced technological communications system along Antonio Parkway in south Orange County. Mr.

Ortega led the system integration efforts and provided design and signal timing support; completed timing implementation; and conduced timing monitoring and system support. The project interconnected twenty-six traffic signals from City, County, and State along the ten-mile corridor and provided a remote connection to a newly constructed County of Orange state-of- the-art TMC in Santa Ana some twenty miles away utilizing shared communications systems.

New traffic signal synchronization resulted in 16% travel time savings, 23% reduction in stops, and 33% reduction in delay. Based on the reduced travel time, vehicle maintenance, fuel consumption and emissions, a $3.5 million estimated cost savings was calculated. This $1.5 million project resulted in $10 million advanced shared communication system.

San Bernardino County Transportation Authority (SBCTA) Tier 1 & 2 Traffic Signal Synchronization Project: This project was awarded the 2011 California Transportation Foundation (CTF) Local Street Project of the Year Award. Multijurisdictional (cities, county, and Caltrans) signal interconnect design and timing plan development, implementation, fine-tuning, and monitoring for 652 intersections.

Mr. Ortega was a signal systems specialist and system integrator on this project and assisted in the interconnect design (conceptual plans and PS&E) utilizing hardwire, fiberoptic, and wireless technologies. He provided timing plan implementation for the peak and off-peak time periods and provided construction management assistance and signal monitoring. Mr. Ortega installed central traffic systems throughout San Bernardino County as part of a multijurisdictional project, using QuicNet, CTNET, Actra and Aries software. He also designed and created network schematics for Tier 1 & 2 agencies.

City of Indio Signal Interconnect Improvements and Coordination Timing Projects for Jackson Street (Avenue 42 to Avenue 48) and Monroe Street (Oleander Avenue to Comet lane): assisted in managing the preparation of communication plans, and led the efforts for system integration and implementation of coordination timing plans.

City of Irwindale - Traffic Signal & Street Improvements at Azusa Canyon Road & Nubia Street Mr. Ortega will be preparing the signal timing sheet for this intersection, reviewing the coordination timing plan and providing signal turn - on support, and assist the City with coordination timing implementation, as well as provide monitoring and fine -tuning of the implemented coordination timing.

Page 2 of 2 ends

Thank you!