ou don' t often get email from alex9355b@outlook. com. Learn why this is important Date: 3/22/2026 12: 33: 12 PM
From:" Alex Brown" Alex9355b@outlook. com
To:" Public Comment" publiccomment@anaheim. net
Subject:[ EXTERNAL] city council - Agenda Item #17 on March 24 Warning: This email originated from outside the City of Anaheim. Do not click links or open attachments unless you recognize the sender and are expecting the message.
The press and OC residents have been documenting the shelter’ s problems for the last 3 years. The city has done nothing to push the shelter to clean house. Once you renew the contract, these are now YOUR problems.
Information from the press with links found on https:// OCShelter. com Fullerton Observer, March 18, 2026
Issues at OC Animal Care and Other Shelters
https://fullertonobserver.com/2026/03/18/issues-at-oc-animal-care-and-other-shelters/ Recent articles and community opinions shed light on troubling issues at Orange County Animal Care ( OC Animal Care) and other municipal animal shelters across California, highlighting concerns around data integrity, negligence, and the overall treatment of animals.
Voice of OC, March 17, 2026
The Co unty Animal Shelter has a Data Integrity Problem https:// voiceofoc. org/ 2026/ 03/ mavrovouniotis- the- county- animal- shelter- has- a- data- integrity- problem/ Numbers don’t add up at OC Animal Care, and it’s not the first time. In shelter statistics, animals inexplicably vanish between reports. The billing calculations are based on faulty data as well.
Why do the county and OC cities allow this?
Voice of OC, March 11, 2026
Advocates Demand Refo rm at California Animal Shelters, Including Orange County https://voiceofoc.org/2026/03/california-animal-shelters-reform/ Animal advocates sent cease and desist letters to municipal animal shelters across the Golden State, including OC Animal Care in Orange County.
Excerpts:
One of the major concerns mentioned in the cease and desist letters is the concept of “ reduced/managed intake” that minimizes the overall number of animals coming into the shelter in an attempt to reduce euthanasia.
Managed intake often involves shelters turning away animals or encouraging members of the public to keep the animal themselves, put it back where it was found or contact a rescue organization.
OC Animal Care, the county-run animal shelter in Orange County, received a cease and desist letter dated Feb. 13.
The county shelter — which has been the subject of numerous grand jury investigations and resident protests over the past several years — practices managed intake for stray cats.
Read: Grand Jury: OC Animal Shelter Needs Updated Policies to Stop Killing More Animals] The shelter does not accept healthy stray cats. Instead, it only accepts sick, injured or underage cats.
Virga said this could be a violation of the Hayden Act, a 1998 state law that outlines certain requirements for animal shelters like mandatory veterinary care and holding periods for stray animals.
To read the cease and desist letter sent to OC Animal Care, click here.
Orange County Supervisors also weighed in on the shelter’ s conditions during their Feb. 24 meeting.
Supervisor Janet Nguyen said the shelter has made improvements over the past year, but it’s a work in progress.
Please know that we appreciate you, but there is still some work to be done,” she said at that meeting.
Nguyen said animal shelter staff are working on a report regarding the 2018 strategic plan and asked for an update within the next 30 days.
Supervisor Vicente Sarmiento thanked residents for pushing for improvements at the shelter and said staff should issue regular updates to make sure OC Animal Care is meeting goals laid out in the strategic plan.
I think we need to do something on a periodic basis, almost as a dashboard, and make sure we’re able to see how we’re doing on these different concerns that we have that are outlined in the strategic plan,” he said.
Shelters should be learning from their mistakes and moving forward and adopting the more enlightened approaches that some of the other shelters in other areas are adopting,” Dales said.
We’ re not seeing that in California on the whole.”
Fullerton Observer, March 5, 2026
Co mpanio n Animal Pro tectio n So ciety Releases Sho rt Do cumentary Entitled A CAPS Investigatio n o f OC Animal Care https://fullertonobserver.com/2026/03/05/companion-animal-protection-society-releases-short-documentary-entitled-a-caps-investigation-of-oc-animal-care/ Shelter mismanagement and failure by the county to conform to a strategic plan and audits have resulted in animal suffering.
You can view the 15- minute video here: A CAPS Investigation of OC Animal Care Voice of OC, February 2, 2026
Lamirande: Ho w Negligent are OC Cities in Their Co ntract with the County Animal Shelter? https://voiceofoc.org/2026/02/lamirande-how-negligent-are-oc-cities-in-their-contract-with-the-county-animal-shelter/ Dear city officials, if you hire people with a track record of dishonesty and incompetence, you’re responsible for the consequences. If you are in favor of good governance and a good shelter you must make two demands: First, get rid of toxic managers. Second, transparently implement the Strategic Plan.
Research study, February 2026
How long do do gs stay in a shelter? We can measure this accurately and link it to shelter o peratio ns https:// link. growkudos. com/ 1eob559gykg
Voice of OC, January 4, 2026
OC Animal Care Faces Negligence Lawsuit After Dog Mauling https://voiceofoc.org/2026/01/oc-animal-care-faces-negligence-lawsuit-after-dog-mauling/ Aformer volunteer is suing the county animal shelter after she was attacked by a shelter dog, bitten 18 times while screaming for help.
Voice of OC, December 4, 2025
Is the County Working to Fix the Animal Shelter’s Problems? If so , Why Haven’t Any Progress Reports Been Released? https:// voiceofoc. org/ 2025/ 12/ vaughn- is- the- county- working- to- fix-the- animal- shelters- problems- if-so- why- havent- any- progress- reports- been- released/ While there’ s some positive change in the shelter, serious problems remain. OC needs to be transparent about the implementation ( or not?) of the shelter’ s taxpayer- funded Strategic P lan. It also needs to value its experienced volunteers, instead of restricting them to crowded walkways and yards deteriorating into mud pits.
OC Register, August 17, 2025
Owner o f Woo fy Acres dog rescue charged with 16 co unts o f animal cruelty https://www.ocregister.com/2025/08/15/owner-of-woofy-acres-dog-rescue-charged-with-multiple-counts-of-animal-cruelty/ Excerpts:
The owner of a Southern California dog rescue has been charged with 37 criminal counts of mistreating the animals, nearly 100 of which were in such bad condition they had to be euthanized.
Woofy Acres first made headlines in early 2024 after Bedford was accused of abandoning 32 dogs — many from Orange County — at a Rowland Heights kennel in Los Angeles County.
Woofy Acres was heavily used by Orange County Animal Care.
Orange County Animal Care has released a total of 149 dogs to Woofy Acres, with the last placement in January 2024. It is unclear whether any dogs from Orange County were among the dogs sei zed by authori ti es.
Voice of OC, August 7, 2025
Two Do gs Dead in Transport from OC Animal Care to Idaho https://voiceofoc.org/2025/08/two-dogs-dead-in-transport-from-oc-animal-care-to-idaho/ Excerpt:
U.S. Department of Transportation statistics show shortnosed breeds of dogs are more likely to die during air transport than dogs with normal-length muzzles, and similar risks are likely during road transportation,” reads a best practices resource document from the AVMA for relocating pets in non-emergency situations.
This is thought to be related to respi ratory problems that are exacerbated by stress and di ffi culty with thermoregulation, so caution should be exerci sed when transporting these animals during warm weather,” it conti nues.
When transporting animals on the road, the American Veterinary Medical Association recommends keeping the trips as short as possible.
Research Study, March 2025
Yo u’ re more likely to adopt a dog yo u see face to face: Animal shelter visitation po licies matter https:// link. growkudos. com/ 1ewal0slvr4
Voice of OC, February 18, 2025
OC Cities are Badly Served by the Co unty Animal Shelter. Is Reform Possible? https://voiceofoc.org/2025/02/lamirande-oc-cities-are-badly-served-by-the-county-animal-shelter-is-reform-possible/ Residents paid OC Animal Care $5.8 million in license fees. On top of that, OC cities paid $15.7 million out of their budgets. The county bureaucracy collected $8.4 million in admin costs.
Supervisors Nguyen and Sarmiento, representing high- paying cities, are pushing for a better shelter. Supervisor Foley is protecting the mismanagement.
Excerpts:
The county took in $5.8 million in license fees from pet owners. But that covers only a fraction of OCAC’s budget and left $16.8 million in net expenses. Of this, the county allocated $15.7 million or 93% of the cost to the cities, to be paid out of their municipal budgets.
To recap, the county pays 7% of the billable amount, or $ 1. 2 million, but collects $ 8. 4 million to feed its bureaucracy. That’ s why the county wants to control the ani mal shelter. It’ s revenue for county headquarters.
OCAC is not meeti ng standards on kennel staffi ng, because money is goi ng to overhead rather than rank- and- file staff. county bureaucrats are attempti ng to downgrade shelter standards by “ updati ng” ( read: canceli ng) the Strategi c Plan. They issued an RFP that had only one bi d from some generi c consultant. Then Dylan Wright’ s bureaucracy that consumes millions in admin costs took 4.5 months for “ ranking” one bid. Huh? If this RFP wasn’t malfeasance, it was total incompetence.
It should be invalidated… and investigated.
With good policies, the existing plan is the cost-effective way to serve the companion animals as well as the taxpayers of OC.
In the Board discussion about kennel staffing, Foley chimed in: “ we do intend to follow the NACA gui delines for standards of care in animal shelters, I believe that that’ s the case.” How convenient. Did Foley look up the recommendation of the county’s own consultants to see that OCAC is falling way sho rt of these standards? Let me help. Foley can go to pages 4-5 of these excerpts from the JVR recommendations to read: “ Staffing for daily cleaning and feeding based on HSUS, NACA, ASV: … This equates to 26 Full-Time-Equivalent staff members per day.” That’s a careful calculation, done by experts in animal sheltering. Instead, Foley blindly sided with Schmidt’s PR.
Contact the cities that use OCAC and tell them to start exploring other options. If they don’t, the county bureaucracy will corner them into another sucker contract.
OC Register, September 29, 2024
The OC’ s inexcusably badly run animal shelter
https:// enewspaper. ocregister. com/ infinity/ article_ popover_ share. aspx? guid= bc40bdc0- 13d9- 44e7- b6fb- 4c1c55b3ec16& share= true letter to the editor; scroll to the 4th letter down)
OC Register, September 25, 2024
County managers failed our animal shelter
https:// www. ocregister. com/ 2024/ 09/ 24/ county- managers- failed- our- animal- shelter/ No te: There’s a problem in the OC Register app. If that app is on your device, press and hold the link, copy it, and then paste it into your web browser.] If you’re having trouble with the above link, try this Shareable Link. https:// www. ocregister. com/ 2024/ 09/ 24/ county- managers- failed- our- animal- shelter/? share= 2opwholwe04gnaisaeiw As a last resort, there is also a P rint Edition Link but then you don’ t have access to the links embedded inside the article. https://edition.pagesuite.com/popovers/dynamic_article_popover.aspx?guid=b13ee9db-5147-4f55-afd9-44c3bbdcaecd& appcode=OCR108&eguid=6fc45ebd-3c76-43f1-a3afbe1d2ca327cf& pnum=56# OC Register, September 9, 2024
Wo o fy Acres do g rescue under criminal investigatio n, 114 dogs seized by San Bernardino Co unty https://www.ocregister.com/2024/09/09/woofy-acres-dog-rescue-under-criminal-investigation-114-dogs-seized-by-san-bernardino-county/?share=eyrmnnoh0pcao1eddcns There's no denying those dogs were neglected,' said a volunteer with Orange County Animal Care, which sent 149 dogs to the Pinon Hills rescue Voice of OC, September 5, 2024
The OC Animal Shelter Directo r is All Image and No Substance https://voiceofoc.org/2024/09/mavrovouniotis-the-oc-animal-shelter-director-is-all-image-and-no-substance/ The county bureaucracy prefers political spinning over operational knowledge and experience. That’s why they chose Monica Schmidt for OC Animal Care Director. She overstated her animal sheltering qualifications to get the job, and she habitually misleads the community and elected officials.
Voice of OC, August 13, 2024
Yamashiro : Questionable Co ntracts and Understaffed Shelter, A Crisis in OC Animal Care https://voiceofoc.org/2024/08/yamashiro-questionable-contracts-and-understaffed-shelter-a-crisis-in-oc-animal-care/ Are county contracts being issued without proper oversight? A former OC Animal Care employee, now living out of state, received a contract that seems to have produced no tangible results.
Meanwhile, OC Animal Care is understaffing kennels and ignoring the majority of their very expensive 2018 Strategic P lan.
Voice of OC, May 16, 2024
Yamashiro : OC Animal Care – Mismanagement and Public Deception Regarding Small Pets https://voiceofoc.org/2024/05/yamashiro-oc-animal-care-mismanagement-and-public-deception-regarding-small-pets/ OC Animal Care has been involved in transferring small pets to a reptile organization, which subsequently transported them to Arizona. In a related situation, it was reported that small pets from San Diego Humane Society were likely sold in Arizona as snake food. OCAC has not provided clear explanations regarding the fate of these animals, and support from County Supervisors Wagner and Foley has been lacking.
Voice of OC, April 16, 2024
Boyer: A Deteriorating Animal Shelter and Millions in Suspicious Contracts https:// voiceofoc. org/ 2024/ 04/ boyer- a- deteriorating- animal- shelter- and- millions- in- suspicious- contracts/ Is there a problem in county management? We praise and blame County Supervisors. We ignore the top managers in county bureaucracy. One agency, OCCR, is wasting taxpayer dollars and abetting the grim disarray of the animal shelter. What’s hiding behind their disinformation? Chapman P anther ( Chapman University), March 19, 2024
Our co mmunity deserves a decent animal shelter
https://www.thepanthernewspaper.org/opinions/opinion-our-community-deserves-a-decent-animal-shelter Excerpts:
The mismanagement went on too long, and that’s depressingly obvious in the shelter’ s dismal statistics, as exposed in a most recent Orange County Register article. Small steps are not enough.
We already have the blueprint for a well-run shelter: the shelter’ s own strategic plan, which was developed by national experts and unanimously approved by the Board of Supervisors in 2018.
Was that just for show?
By this plan, the shelter should:
Give dogs dai ly opportunities to sociali ze wi th other dogs. Take cats out of their kennels at least three ti mes per week. Log and track these acti vi ti es for each animal.
Mi ni mi ze the ani mals’ length of stay in the shelter. Remove roadblocks to getting ani mals adopted or, when appropriate, rescued. Provi de veteri nary care for ani mals that need it, while maki ng them available for public adoption.
Return at least 45% of stray dogs to thei r owners. Ramp up a program to trap, neuter, and return ( TNR) community cats. Get at least 85% of incomi ng cats adopted or rescued.
Follow nati onal standards written by the Associ ati on of Shelter Veterinari ans ( ASV).
The shelter is way behind on all of these.
Fullerton Observer, March 12, 2024
Mo re Bad News About Orange Co unty Animal Care
https://fullertonobserver.com/2024/03/12/more-bad-news-about-orange-county-animal-care/ Excerpts:
On September 10 last year, the OC animal shelter handed over rescue dogs Baron, Kate, Enzo, and Nevin to the group Woofy Acres. OC staff were concerned. Jaime Link, OCAC Operations Manager, wrote:
We recently had a rescue pi ck- up wi th the li sted representati ve, Di ane ( see PID screenshot), and the shelter team reported that her vehicle emitted an odor of animal waste and gri me remi niscent of most hoardi ng houses. She was also behaving errati cally and yelling at staff in the lobby. The rescuer has recently been pulling a lot of aggressive dogs ( 5 today), and I am concerned they may be going into less-than-ideal conditions.” In the nine prior weeks ( from July 5 to September 8 last year), the OC animal shelter had already given 21 dogs to Woofy Acres. T he shelter gave a total of 128 dogs to Woofy Acres in 2020- 2023.
In February, the OC Register reported that Woofy Acres abandoned 32 dogs at a dog boarding facility last year. Some were in the facility for two years. Woofy Acres is delinquent on its bills and state-mandated paperwork. Almost half of the abandoned dogs were given to Woofy Acres by OC Animal Care in 2021. The OC shelter gave many more dogs to Woofy Acres in 2022 and 2023; what happened to them is unknown.
Spokesperson Alexa Pratt told the Register that “ the agency was unaware of any problems wi th Woofy Acres when it released dogs to the rescue, the last ones going in early January.” But Jaime Link’s September 10, 2023 email tells a different story. OC was very aware of problems through the first-hand observations of conscientious staff.
It is unknown what research the shelter did, but it seems it didn’ t even try to verify Woofy Acres’ s charity status with the state.
Michael Mavrovouniotis, an animal welfare advocate, said, “ Mid-level and frontline OCAC staff love the animals and are doing their best to get good outcomes for them. I applaud Jaime Link and the animal care staff, who spoke up. They did the ri ght thi ng. They showed a better shelter is possible. However, the top managers at the shelter and OC Community Resources don’ t show the same concern for the welfare of the animals in their care. They falsely clai m that they di dn’ t know there were any problems.” The shelter just kept handing animals over to Woofy Acres. In the last five months of 2023, the shelter gave 48 dogs to Woofy Acres after Woofy Acres had already abandoned dogs. Of those, 23 dogs were handed over after Jaime Link’s red-flag email describing erratic behavior and signs of hoarding.
Unaccounted animals include Tate, Bonnie, and Gadget, who came from Fullerton. None of these dogs are in the boarding facility. The shelter booked them as successes in its statistics, but the actual fate of the animals is unknown. OC residents concerned about what happened to these dogs can http://The%20OCAC%20has%20been%20criticized%20for%20not%20tracking%20animals%20in%20its%20statistics,%20giving%20pet%20bunnies,%20hamsters,%20and%20guinea%20pigs%20to%20a%20 era% 20policies.% 20On% 20September% 2010% 20last% 20year,% 20the% 20OC% 20animal% 20shelter% 20handed% 20over% 20rescue% 20dogs% 20Baron,% 20Kate,% 20Enzo,% 20and% 20Nevin% 20to% 20the% the Board of Supervisors and their local elected officials to ask for a full accounting.
OC Register, March 5, 2024
Animal rescue abando ns do zens o f do gs at Ro wland Heights kennel Do gs from OC agency among 32 abandoned by gro up
https://www.ocregister.com/2024/03/04/animal-rescue-abandons-dozens-of-dogs-at-rowland-heights-shelter/ Excerpts:
Especially troubling to ani mal activists is that Orange County Ani mal Care has released 128 dogs to Woofy Acres si nce 2019, accordi ng to county records compiled by acti vi st Mi chael Mavrovouni oti s.
The Orange County shelter just takes the vi ew that we don’ t care who takes the animals as long as we get them off our books,” He believes Orange County Ani mal Care should do a better job of screening ani mal rescues and following up on placements.
It’ s part of ( Orange County’ s) reli ance on rescues,” Mavrovouni otis said. “ The shelter is not doing enough to make adoptions easi er and thei r safety valve is to push as many animals as possible … to rescues.”
OC Register, March 2, 2024
Fewer ‘ fixes’ mean mo re dead cats in Orange County
https://www.ocregister.com/2024/03/01/fewer-fixes-mean-more-dead-cats-in-orange-county/?share=ercnnpt0sef1dsidoota Column: Animal services in Los Angeles, Long Beach, do better, while Riverside is all systems go to ' fix' street cats and reduce deaths Excerpts:
Consi der: The city of Los Angeles racked up a “ li ve outcome” rate of nearly 81% for cats that entered its shelters last year. Just 19% were euthani zed or di ed in care, accordi ng to city data.
Orange County Animal Care, in contrast, racked up li ve outcomes of just 68. 6% for cats. More than 30% were euthani zed or died in care last year. That’ s an 8% jump in the raw number of dead cats over 2019 ( to 1, 925 from 1, 779), even as the total number of impounded cats plunged by nearly a third ( to 6, 393 from 9, 369).
Myri ad studies have found that spayi ng and neuteri ng street cats vastly reduces death.
In 2019, the last year of the street cat spay/ neuter program, 19% of cats di ed or were euthanized at OC Ani mal Care. In 2023, more than 30% di ed or were euthanized.
Today, folks who bri ng healthy street cats to the shelter are turned away and told to return the ani mal to where they found it, rescuers say. And it appears those cats make more cats. Who make more cats. And so on.
To make a dent in the suffering, we can’ t fi x one cat at a ti me, said Romina Yamashi ro. The county must commi t to high- volume, intensi ve TNR targeti ng large feral colonies. It’ s in O. C.’ s strategic plan for the shelter. It’ s been urged by the grand jury. But, alas.
We’ re so frustrated,” she sai d. “ Orange County has a magni fi cent, $ 35 mi lli on faci lity, several surgery sui tes, three or four vets on staff. If we could make that work to provide spay and neuter for feral cats, you’ d see a reduction in intakes and that would help not just the cats in the community, but the people in the community.” The 14 cities that contract with Orange County for animal services — including Anaheim and Santa Ana —should be outraged, she said.
OC Register, February 11, 2024
Fewer do gs, mo re death, at OC Animal Care
https://www.ocregister.com/2024/02/11/fewer-dogs-more-death-at-oc-animal-care/ Column: Comparison of pre- and post- pandemic years show failure of shelter policies, critics charge. But things are changing, shelter asks for support Excerpts:
The “ kill rate” for dogs at Orange County’ s main ani mal shelter shot up markedly under its appointment- centric vi si tati on system, where folks couldn’ t browse the full furry inventory at their leisure, data suggests.
Rather than throwi ng the doors all the way open, Orange County stuck largely to pandemi c protocol last year, preferri ng that people peruse pooch photos online, then make appoi ntments to meet those animals in person. […] “ Concierge service,” they called it.
Critics countered that the system benefitted shelter managers, not animals or the adopting public. It’s easier to not have all those pesky outside eyeballs on your operations, they charged.
Three hours every day is better, criti cs said, but all the kennels wi th adoptable ani mals should welcome the publi c every hour they’ re open.
Nati onally, the number of dogs who were euthanized or who di ed in care rose as well. But whi le that jumped 12% nati onwide, it rose 54% in Orange County. That, Mavrovouni oti s maintai ns, shows O.C. is doing something wrong. “ By any metric I looked at, national trends don’t explain OCAC’ s decline,” he said.
Yes, folks, please, absolutely. Foster! Volunteer! Help our unwanted animals be wanted and loved again! Let them sleep on the bed! We may be a bit naïve, but it seems that supporti ng the shelter, and opening it wider as activists demand, are not necessarily mutually exclusive things.
It’ s quite si mple, really,” said Boyer. “ They need to open up the shelter all the way, all the buildi ngs, so people can walk through and look at all the avai lable dogs. It was worki ng fi ne before COVID. Why don’t you back to doing what you did?”
The numbers, Boyers maintains, understate the full magnitude of the problem. “ Because of slow adoptions, the shelter got severely overcrowded in the fall. A lot of dogs weren’t going to make it out alive, but the hangar fire brought in the ASPCA that saved 100+ dogs.
Under the partial re-opening, the public can view only about 65 to 70 dogs. But the shelter has about 100 dogs available for adoption. Visitors should be able to see all of them in their kennels. The shelter shouldn’ t be hiding 30 to 35 dogs out of sight.” Fullerton Observer, January 2, 2024
Animal Advocates Call for Independent Investigation o f OC Animal Care https://fullertonobserver.com/2024/01/02/animal-advocates-call-for-independent-investigation-of-oc-animal-care/ Excerpts with added web li nks to supporti ng documents:
In just 20 months, OC Animal Care (OCAC) gave 273 rodents, 200 rabbits, and other small pets to a reptile group.
On a recent similar case involving animals from San Diego, the Sacramento Bee reports that: “ Information clearly indicates (the reptile breeder’ s) intention to use these animals as feed instead of finding them adoptive homes.”
Snapshots of email correspondence obtained via Public Record requests show that the OC shelter typically offered many small pets at once. The reptile group then took rodents and rabbits in bulk without asking for precise numbers and types of animals. That’s highly unusual.
OC Animal Care made this reptile group its primary destination for small pets.
In the past, [ the reptile group] has advertised the availability of “ feeder” rodents, including live ones.
An independent outside investigator must be appointed directly by the Board of Supervisors to get a verifiable paper trail for every animal the OC shelter handed over to the reptile group.
OC Register, December 10, 2023
Animal officials promise compassion, but offer euthanasia https:// www. ocregister. com/ 2023/ 12/ 08/ animal- officials- promise- compassion- but- offer- euthanasia/ This item has also been picked up by a think tank and by Newsbreak:
https://www.newsbreak.com/california-state/3266656921694-why-are-california-s-animal-shelters-killing-so-many-pets https://reason.com/2023/12/15/why-are-californias-publicly-funded-animal-shelters-are-killing-so-many-pets/ Excerpt:
Obviously, fewer people will fall in love with a purring or barking buddy if they can’t wander through the kennels and see which animal pulls at their heartstrings. You can no more pick out a pet based on a shelter’ s photo than you can pi ck out a spouse solely on thei r dati ng website bi o. Animal Care increased the number of walk- in visi ts ami d cri ti ci sm, but it’ s sti ll absurdly limi ted and I gave up trying to get info after a really long wai t on its phone li ne.
The bureaucrats who run the faci lity – the largest muni ci pal “ ani mal- care” operati on in the West – depi ct these customer- unfriendly, animal- harmi ng poli ci es as a means to protect the critters from stress and protect the publi c from animal bi tes. In reali ty, it’ s just the latest instance of government putti ng the employees’ convenience above the public good OC Register, December 2, 2023
OC Animal Care so ught to avo id o ptics of sending bunnies to local reptile rescue group https://www.ocregister.com/2023/12/01/oc-animal-care-sought-to-avoid-optics-of-sending-bunnies-to-local-reptile-rescue-group/ Voice of OC, November 22, 2023
The OC Animal Shelter Lied Abo ut Its Safety Reco rd. It Needed an Excuse to Keep the Kennels Off- Limits and Ditch Its Strategic Plan. https://voiceofoc.org/2023/11/mavrovouniotis-the-oc-animal-shelter-lied-about-its-safety-record-it-needed-an-excuse-to-keep-the-kennels-off-limits-and-ditch-its-strategic-plan/ The county misinformed the public and the Grand Jury. It understated the number of bites that occurred at the animal shelter in 2021- 2022. In reality, shelter policies resulted in no safety improvements. False statistics served as a smokescreen for disregarding the Strategic Plan, blocking public access, and lowering animal care standards.
Voice of OC, November 14, 2023
Yamashiro : OC Animal Care Gave Hundreds o f Rabbits, Guinea Pigs, and Birds to a Reptile Gro up. What Happened to Them? https:// voiceofoc. org/ 2023/ 11/ yamashiro- oc- animal- care- gave- hundreds- of- rabbits- guinea- pigs- and- birds- to- a-reptile- group- what- happened- to- them/ Voice of OC, October 25, 2023
Lawther: Animal Shelter Deteriorates as Co unty Bureaucracy Keeps Superviso rs in the Dark https:// voiceofoc. org/ 2023/ 10/ lawther- animal- shelter- deteriorates- as- county- bureaucracy- keeps- supervisors- in- the- dark/ OC Community Resources covered up the deterioration of the animal shelter. It put together a false narrative for internal use, but kept it from the public. Meanwhile, the shelter’ s kill rate is rising, dogs get very little socialization, and data collection is dismal. Why is the shelter flouting its own Strategic Plan? OC Register, October 14, 2023
Advocates ho rrified over mysterious fate of small animals https://www.ocregister.com/2023/10/13/advocates-horrified-over-mysterious-fate-of-small-animals/?share=saaeotyscecmamsaw1ie or
https:// www. ocregister. com/ 2023/ 10/ 13/ advocates- horrified- over- mysterious- fate- of- small- animals/ Voice of OC, September 20, 2023
How to Fix OC Animal Care? Use the Strategic Plan!
https:// voiceofoc. org/ 2023/ 09/ mavrovouniotis- how- to- fix- oc- animal- care- use- the- strategic- plan/ OC Community Resources is mismanaging the animal shelter. More animals are getting killed. Animal care and behavior assessment are substandard, creating dangerous conditions. Kennel staff and volunteers are exhausted. T here’ s a solution: Implement the animal shelter’ s Strategic Plan. Get off pandemic mode. Re- open the kennel areas to adopters.
Voice of OC, August 24, 2023
Barba: OC Animal Care Needs to Get Its Facts Straight
https://voiceofoc.org/2023/08/barba-oc-animal-care-needs-to-get-its-facts-straight/ OCAC is making false claims to cover up its poor performance. It can’ t even count its animals correctly. Although fewer animals are coming in than pre- pandemic, the shelter has higher kill rates and longer stays. More adopted animals end up returned. OCAC has been failing its Strategic P lan – and hiding it.
Fullerton Observer, August 16, 2023 (This is a multi-section article. Make sure you scroll down!) OC residents raise co ncerns o ver OC Animal Care shelter Orange Co unty Tax Payers and Homeless Animals Deserve Better OC Animal Care is co ntinuing to mislead the public
https://fullertonobserver.com/2023/08/16/oc-residents-raise-concerns-over-oc-animal-care-shelter/ Voice of OC, August 7, 2023
Lawther: OC Animal Care is Unable to Keep Track o f its Animals https://voiceofoc.org/2023/08/lawther-oc-animal-care-is-unable-to-keep-track-of-its-animals/ OCAC appears to have fabricated the only 2023 animal statistics it has published so far. We effectively know nothing about current animal intakes, outcomes, or kill rates. What we do know is that their data can’ t be trusted. It’s time for the Board of Supervisor to act.
Los Angeles Times, June 9, 2023
Status quo at O. C. animal shelter ‘ unacceptable’ as euthanasia rates rise, repo rt says https://www.latimes.com/california/story/2023-06-08/orange-county-animal-care-shelter-grand-jury-report-dogs-cats-euthanized KT LA 5 News, June 9, 2023
Grand jury raises co ncerns abo ut OC Animal Care’ s po licies https://ktla.com/news/local-news/grand-jury-raises-concerns-about-oc-animal-cares-policies/ OC Register, June 9, 2023
OC Grand Jury raises concerns with management, animal welfare at OC Animal Care https://www.ocregister.com/2023/06/09/oc-grand-jury-raises-concerns-with-management-animal-welfare-at-oc-animal-care/ Voice of OC, June 8, 2023
Grand Jury: OC Animal Shelter Needs Updated Policies to Sto p Killing More Animals https:// voiceofoc. org/ 2023/ 06/ grand- jury- oc- animal- shelter- needs- updated- policies- to- stop- killing- more- animals/ Fullerton Observer, June 7, 2023
Grand Jury Report: The State o f Animal Welfare Overseen by the Co unty o f Orange https://fullertonobserver.com/2023/06/07/grand-jury-report-the-state-of-animal-welfare-overseen-by-the-county-of-orange/ OC Register, May 11, 2023
OC’ s animal shelter still a killing zo ne
https:// www. ocregister. com/ 2023/ 05/ 11/ ocs- animal- shelter- still- a- killing- zone/ OC Register, May 10, 2023
Revamp Orange County Animal Care shelter po licies, critics tell OC superviso rs https:// www. ocregister. com/ 2023/ 05/ 10/ revamp- orange- county- animal- care- shelter- policies- critics- tell- oc- supervisors/ KNX News, May 8, 2023
Orange Co unty animal shelter kill rates do uble for adult do gs in 3 years https://www.audacy.com/knxnews/news/local/orange-county-animal-shelter-kill-rates-double-in-3-years OC Register, May 7, 2023
Mo re adult do gs dying at OC Animal Care, kennels largely off- limits https://www.ocregister.com/2023/05/07/more-adult-dogs-dying-at-oc-animal-care-kennels-largely-off-limits/?share=tocecdmereiywdporla0 ate: 3/22/2026 12:50:16 PM
From:" Michael Mavrovouniotis" michaelmavrovouniotis@gmail. com To:" Public Comment" publiccomment@anaheim. net
Subject:[ EXTERNAL] Public comment for city council, March 24, 2026, agenda # 17 Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Honorable City Council,
I am a volunteer data scientist for the non- profits Social Compassion in Legislation & Social Compassion. I published four peer- reviewed research papers on animal sheltering in the last 19 months. You can find explanations of my research for a general audience here:
https:// www. growkudos. com/ profile/ michael_ mavrovouniotis and the rest of my research profile here:
https:// www. researchgate. net/ profile/ Michael- Mavrovouniotis At the moment, OC Animal Care is your only option. Understandably, you’ ll sign the contract. But you can, in addition:
Tell OC Animal Care that you expect them to follow their 2018 Strategic Plan, approved unanimously by the Board of Supervisors. That’ s the performance standard, not whatever a random manager decides from one month to the next.
Tell city staff to study an alternative: An animal shelter that is community- centered and practices prevention rather than reaction. Such a shelter would save money for the city, because prevention is more cost- effective, and because the community would contribute via donations and volunteering. In case you didn’ t know it… Any donations currently offset the county’ s cost share for the unincorporated areas, but not the cities. If somebody leaves a $ 500, 000 bequest to the shelter, it doesn’ t change the city’ s costs or the services, it only reduces the county’ s out- of-pocket cost by $500, 000. ate: 3/24/2026 5:43:50 PM
From:" Stephanie Mercadante" burglin.stephanie@gmail. com To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Residents Demand Clarity onWater Safety, PFAS, and Perchlorate Contamination Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Councilmembers,
Do you, as Councilmembers, actually know without hesitation that Anaheim’s drinking water is safe? Have you asked that question recently? Because residents are paying attention, and they are documenti ng what they see.
In Anaheim Hills, people have recorded repeated hydrant flushing. Hydrant flushing can be normal when it is routine maintenance. But when it happens right before water testing, it raises a different question. It raises the question of whether the City is trying to clean out the system so the results look better than what residents drink every day.
Here is why this matters.
On September 17, 2025, a valve was opened 22 percent. On September 23, it was opened to about 50 percent. Opening a valve like that pushes a huge amount of water through the pipes. That can temporari ly make the water appear cleaner, but it does not reflect normal conditions. Turbidity should be between .01 and .06. On September 23, it jumped to 3.2. That is not a small difference. That is a sign that something is wrong.
So the public deserves a straight answer. Why was so much water flushed right before testing? Was the City trying to influence the results? Or is Anaheim simply comfortable wasting hundreds of thousands of gallons of water without explanation?
Then there is Well 51, which serves West Anaheim. The State notified the City that this well had elevated PFOS levels. PFOS is part of the PFAS family. These are forever chemicals. They do not break down. They stay in the soil, they stay in the water, and they stay in our bodies. They are linked to cancer and long term health problems.
Residents deserve to know when the City was notified, whether the well was shut down immediately, and whether the public was told the truth or left drinking contaminated water without knowing it.
We also need to talk about perchlorates. These chemicals are used in rocket fuel, explosives, and fireworks. They interfere with the thyroid and can affect metabolism and child development. Anaheim’s own water data has shown elevated perchlorate levels in certain areas. Fireworks fallout is a known source of perchlorate contamination. So when the City insists fireworks are harmless, yet perchlorates show up in the water, residents have every right to question that narrative.
And here is the part the City avoids.
Why are residents paying for the cleanup? Why are families and taxpayers covering the cost of PFAS and perchlorate remediation while the companies that created the contamination are shielded from any real accountabili ty? Forgive me for being facetious. We all know why. Those polluters are the people this City actually serves.
They get protection. Residents get the bill. This is the pattern.
When residents raise concerns, the City minimizes them. When data looks bad, the focus shifts to optics instead of solutions.
When transparency is needed, the public gets silence.
Before we hear another polished statement about rejecting the premise of the question, Iwill leave you with this:
You and your families are drinking this water too.
This is not political. It is about safety.
Is the water safe or not? If it is safe, show the proof. If it is not, tell the truth.
Thank you.
ate: 3/21/2026 4:37:07 PM
From:" S R" [email protected]
To:" Ryan Balius" [email protected], "Public Comment" publiccomment@anaheim. net Cc:" City Clerk" [email protected]
Subject:[
EXTERNAL] Meeting 3-24-26 Agenda Items 24 & 25 – Anaheim Hills Festival Project (DEV2023-00043) – Response to Rehearing Denial and Related Actions
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: 3/21/ 26
Honorable Councilmember Ry an Balius,
Thank you for your time and consideration of this matter. I rec ognize the complex ity of the issues befo re you and the responsibility inv olv ed in balancing community needs, dev elopment, and public safety . This response is offered in good faith and is intentionally focused on a small number of key proc edural and analy tical considerations that remain unresolv ed in the record and are important to ensuring a complete and informed decision- making process.
1. Incomplete Wildfire Evacuation Analysis
The City acknowledges that a comprehensiv e wildfire ev ac uation plan is currently in dev elo pment, yet the Projec t was appro ved prio r to completion of that analy sis. This raises a fundamental conc ern under CEQA, which requires dec isio ns to be based on the best av ailable information— particularly where public safety is at stake.
The ev acuation analy sis relied upon in the EIR does not appear to incorporate:
Updated regional traffic conditions
Real- world human behav ior during emergenc y ev ac uations Cumulativ e impacts across known bottlenecks and constrained ev acuation routes Approv ing the Projec t while a City -initiated ev ac uation study remains incomplete creates a disc onnec t between ac knowledged risk and the conclusions relied upon for approv al.
2. Procedural Limitations on Public Participation
The administrativ e record reflects that the public hearing was formally closed on January 1 3, 20 26, while deliberations and consideratio n of the Projec t continued thereafter. Although general public comment was permitted at subsequent meetings, this is no t equiv alent to partic ipation within an open public hearing tied to ac tiv e deliberation.
This distinc tion matters. Meaningful partic ipation under CEQA is intended to occ ur within the dec ision- making framewo rk itself, where public input can direc tly inform the outc ome. The struc ture used here limited that opportunity .
3. Departure from Adopted Public Comment Procedures
The Project involved legislativ e components, yet public comment was limited to three minutes per speaker without a clear ex planation in the record for dev iating from the City ’s standard five-minute alloc ation for legislativ e matters.
Adherenc e to established proc edures is essential to maintaining consistenc y and public trust. Where dev iations occur, the basis for tho se decisions should be clearly doc umented.
4. Inconsistent Project Description – Parking Discrepancy The administrativ e record contains conflic ting information regarding required parking:
Draft EIR: 1 ,07 5 spaces
Parking Study : 963 spaces
While this disc repancy has been acknowledged, it does not appear to hav e been fully reconc iled in the record. A stable and internally consistent projec t desc ription is foundational under CEQA , as it directly informs the analy sis and the findings relied upon for appro val.
5. Access to Information and Transparency
Certain materials requested during the rev iew proc ess, including internal communications and tec hnic al ev aluations, were not made av ailable.
These materials are relev ant to understanding how key analy ses—particularly those related to fire safety and ev ac uation—were ev aluated and relied upon.
Access to this information supports informed public participation and confidence in the dec isio n-making proc ess.
Conclusion
his response is not intended to restate the full appeal, but rather to highlight a set of focused consideratio ns that remain unresolv ed in the administrativ e record. Taken together, these issues raise important questions about whether the Projec t was rev iewed and appro ved based on a complete and procedurally consistent framework.
At minimum, the record reflects:
Approv al prior to com pletion of a com prehensiv e ev acuation analy sis Lim itations on meaningful public participation during deliberation Inc onsistenc ies in core projec t data
Dev iations from standard procedural practic es
For these reasons, I respectfully request that the Council grant the appeal, or at minimum, remand the matter for further analy sis and proc edural clarific ation to ensure that the decision is based on a complete and consistent rec ord.
This correspondenc e is submitted to ensure the administrativ e record ac curately reflec ts the pro cedural and analy tic al issues raised prior to final action.
Respectfully Submitted,
Shelly Robbins
shelly.n.robbins@gmail. com
81 41 E. Kennedy Rd, Anaheim, CA
ate: 3/21/2026 4:41:56 PM
From:" S R" [email protected]
To:" Carlos A. Leon" [email protected], "Public Comment" publiccomment@anaheim. net Cc:" [email protected]" [email protected] Subject:[
EXTERNAL] Meeting 3-24-26 Agenda Items 24 & 25 – Anaheim Hills Festival Project (DEV2023-00043) – Response to Rehearing Denial and Related Actions
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: 3/ 21 /26
Honorable Councilmember Carlos Leon,
Thank you for your time and consideration of this matter. I rec ognize the complex ity of the issues befo re you and the responsibility inv olv ed in balancing community needs, dev elopment, and public safety . This response is offered in good faith and is intentionally foc used on a small number of key proc edural and analy tical considerations that remain unresolv ed in the rec ord and are important to ensuring a complete and informed decision- making process.
1. Incomplete Wildfire Evacuation Analysis
The City acknowledges that a comprehensiv e wildfire ev acuation plan is currently in dev elopment, yet the Projec t was appro ved prio r to completion of that analy sis. This raises a fundamental conc ern under CEQA, which requires dec isio ns to be based on the best av ailable information—particularly where public safety is at stake.
The ev ac uation analy sis relied upon in the EI R does not appear to incorporate:
Updated regional traffic conditions
Real- world human behav ior during emergenc y ev acuations Cumulativ e impacts across known bottlenecks and constrained ev acuation routes Approv ing the Projec t while a City -initiated ev ac uation study remains incomplete creates a disc onnec t between ac knowledged risk and the conclusions relied upon for approv al.
2. Procedural Limitations on Public Participation
The administrativ e record reflects that the public hearing was formally closed on January 1 3, 20 26, while deliberations and consideratio n of the Projec t continued thereafter. Although general public comment was permitted at subsequent meetings, this is no t equiv alent to partic ipation within an open public hearing tied to ac tiv e deliberation.
This distinc tion matters. Meaningful partic ipation under CEQA is intended to occ ur within the dec ision- making framewo rk itself, where public input can direc tly inform the outc ome. The struc ture used here limited that opportunity .
3. Departure from Adopted Public Comment Procedures
The Project inv olv ed legislativ e components, yet public comment was limited to three minutes per speaker without a clear ex planation in the record for dev iating from the City ’s standard fiv e-minute alloc ation for legislativ e matters.
Adherenc e to established proc edures is essential to maintaining consistenc y and public trust. Where dev iations occur, the basis for tho se decisions should be clearly doc umented.
4. Inconsistent Project Description – Parking Discrepancy The administrativ e record contains conflic ting information regarding required parking:
Draft EIR: 1 ,07 5 spaces
Parking Study : 963 spaces
While this disc repancy has been acknowledged, it does not appear to hav e been fully reconc iled in the rec ord. A stable and internally consistent projec t desc ription is foundational under CEQA , as it directly informs the analy sis and the findings relied upon for appro val.
5. Access to Information and Transparency
Certain materials requested during the rev iew proc ess, including internal communications and technic al ev aluations, were not made av ailable.
These materials are relev ant to understanding how key analy ses—particularly those related to fire safety and ev acuation—were ev aluated and relied upon.
Ac cess to this information supports informed public participation and confidence in the dec isio n-making proc ess.
Conclusion
This response is not intended to restate the full appeal, but rather to highlight a set of focused consideratio ns that remain unresolv ed in the dministrativ e record. Taken together, these issues raise important questions about whether the Projec t was rev iewed and appro ved based on a complete and procedurally consistent framework.
At minimum, the record reflects:
Approv al prior to com pletion of a com prehensiv e ev acuation analy sis Lim itations on meaningful public participation during deliberation Inc onsistenc ies in core projec t data
Dev iations from standard procedural practic es
For these reasons, I respectfully request that the Council grant the appeal, or at minimum, remand the matter for further analy sis and proc edural clarific ation to ensure that the decision is based on a complete and consistent rec ord.
This correspondenc e is submitted to ensure the administrativ e record ac curately reflec ts the pro cedural and analy tic al issues raised prior to final action.
Respectfully Submitted,
Shelly Robbins
shelly.n.robbins@gmail. com
81 41 E. Kennedy Rd, Anaheim, CA
ate: 3/21/2026 4:44:55 PM
From:" S R" [email protected]
To:" Ashleigh Aitken" [email protected], " Public Comment" publiccomme nt@anahe im.net Cc:" City Clerk" [email protected]
Subject:[
EXTERNAL] Meeting 3-24-26 Agenda Items 24 & 25 – Anaheim Hills Festival Project (DEV2023-00043) – Response to Rehearing Denial and Related Actions
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: 3/ 21 /26
Honorable May or Aitken,
Thank you for your continued leadership and thoughtful engagement on this matter. I apprec iate the care and consideration you hav e already brought to ev aluating the Anaheim Hills Festiv al Project. As the Counc il considers Agenda Items 24– 25 , I am offering this foc used response in good faith to highlight sev eral procedural and analy tic al considerations that remain relev ant to ensuring a complete and well- suppo rted decision- making process.
1. Incomplete Wildfire Evacuation Analysis
The City acknowledges that a comprehensiv e wildfire ev acuation plan is currently in dev elopment, yet the Projec t was appro ved prio r to completion of that analy sis. This raises a fundamental conc ern under CEQA, which requires dec isio ns to be based on the best av ailable information—particularly where public safety is at stake.
The ev ac uation analy sis relied upon in the EI R does not appear to incorporate:
Updated regional traffic conditions
Real- world human behav ior during emergenc y ev acuations Cumulativ e impacts across known bottlenecks and constrained ev acuation routes Approv ing the Projec t while a City -initiated ev ac uation study remains incomplete creates a disc onnec t between ac knowledged risk and the conclusions relied upon for approv al.
2. Procedural Limitations on Public Participation
The administrativ e record reflects that the public hearing was formally closed on January 1 3, 20 26, while deliberations and consideratio n of the Projec t continued thereafter. Although general public comment was permitted at subsequent meetings, this is no t equiv alent to partic ipation within an open public hearing tied to ac tiv e deliberation.
This distinc tion matters. Meaningful partic ipation under CEQA is intended to occ ur within the dec ision- making framewo rk itself, where public input can direc tly inform the outc ome. The struc ture used here limited that opportunity .
3. Departure from Adopted Public Comment Procedures
The Project inv olv ed legislativ e components, yet public comment was limited to three minutes per speaker without a clear ex planation in the record for dev iating from the City ’s standard fiv e-minute alloc ation for legislativ e matters.
Adherenc e to established proc edures is essential to maintaining consistenc y and public trust. Where dev iations occur, the basis for tho se decisions should be clearly doc umented.
4. Inconsistent Project Description – Parking Discrepancy The administrativ e record contains conflic ting information regarding required parking:
Draft EIR: 1 ,07 5 spaces
Parking Study : 963 spaces
While this disc repancy has been acknowledged, it does not appear to hav e been fully reconc iled in the rec ord. A stable and internally consistent projec t desc ription is foundational under CEQA , as it directly informs the analy sis and the findings relied upon for appro val.
5. Access to Information and Transparency
Certain materials requested during the rev iew proc ess, including internal communications and technic al ev aluations, were not made av ailable.
These materials are relev ant to understanding how key analy ses—particularly those related to fire safety and ev acuation—were ev aluated and relied upon.
Ac cess to this information supports informed public participation and confidence in the dec isio n-making proc ess.
Conclusion
This response is not intended to restate the full appeal, but rather to highlight a set of focused consideratio ns that remain unresolv ed in the dministrativ e record. Taken together, these issues raise important questions about whether the Projec t was rev iewed and appro ved based on a complete and procedurally consistent framework.
At minimum, the record reflects:
Approv al prior to com pletion of a com prehensiv e ev acuation analy sis Lim itations on meaningful public participation during deliberation Inc onsistenc ies in core projec t data
Dev iations from standard procedural practic es
For these reasons, I respectfully request that the Council grant the appeal, or at minimum, remand the matter for further analy sis and proc edural clarific ation to ensure that the decision is based on a complete and consistent rec ord.
This correspondenc e is submitted to ensure the administrativ e record ac curately reflec ts the pro cedural and analy tic al issues raised prior to final action.
Respectfully Submitted,
Shelly Robbins
shelly.n.robbins@gmail. com
81 41 E. Kennedy Rd, Anaheim, CA
ate: 3/21/2026 4:47:58 PM
From:" S R" [email protected]
To:" Kristen Maahs" [email protected], "Public Comment" publiccomment@anaheim. net Cc:" City Clerk" [email protected]
Subject:[
EXTERNAL] Meeting 3-24-26 Agenda Items 24 & 25 – Anaheim Hills Festival Project (DEV2023-00043) – Response to Rehearing Denial and Related Actions
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: 3/ 21/ 26
Honorable Councilmember Kristen Maahs,
Thank you for your time and careful consideration of this matter. I appreciate the thoughtful appro ac h you hav e taken in ev aluating the Anaheim Hills Festiv al Project. As the Counc il considers Agenda Items 24– 25 for the City Counc il Meeting on 3-24- 26, I am submitting this foc used response in good faith to highlight sev eral proc edural and analy tical considerations that remain impo rtant to ensuring a complete and consistent rec ord.
1. Incomplete Wildfire Evacuation Analysis
The City acknowledges that a comprehensiv e wildfire ev acuation plan is currently in dev elopment, yet the Projec t was appro ved prio r to completion of that analy sis. This raises a fundamental conc ern under CEQA, which requires dec isio ns to be based on the best av ailable information—particularly where public safety is at stake.
The ev ac uation analy sis relied upon in the EI R does not appear to incorporate:
Updated regional traffic conditions
Real- world human behav ior during emergenc y ev acuations Cumulativ e impacts across known bottlenecks and constrained ev acuation routes Approv ing the Projec t while a City -initiated ev ac uation study remains incomplete creates a disc onnec t between ac knowledged risk and the conclusions relied upon for approv al.
2. Procedural Limitations on Public Participation
The administrativ e record reflects that the public hearing was formally closed on January 1 3, 20 26, while deliberations and consideratio n of the Projec t continued thereafter. Although general public comment was permitted at subsequent meetings, this is no t equiv alent to partic ipation within an open public hearing tied to ac tiv e deliberation.
This distinc tion matters. Meaningful partic ipation under CEQA is intended to occ ur within the dec ision- making framewo rk itself, where public input can direc tly inform the outc ome. The struc ture used here limited that opportunity .
3. Departure from Adopted Public Comment Procedures
The Project inv olv ed legislativ e components, yet public comment was limited to three minutes per speaker without a clear ex planation in the record for dev iating from the City ’s standard fiv e-minute alloc ation for legislativ e matters.
Adherenc e to established proc edures is essential to maintaining consistenc y and public trust. Where dev iations occur, the basis for tho se decisions should be clearly doc umented.
4. Inconsistent Project Description – Parking Discrepancy The administrativ e record contains conflic ting information regarding required parking:
Draft EIR: 1 ,07 5 spaces
Parking Study : 963 spaces
While this disc repancy has been acknowledged, it does not appear to hav e been fully reconc iled in the rec ord. A stable and internally consistent projec t desc ription is foundational under CEQA , as it directly informs the analy sis and the findings relied upon for appro val.
5. Access to Information and Transparency
Certain materials requested during the rev iew proc ess, including internal communications and technic al ev aluations, were not made av ailable.
These materials are relev ant to understanding how key analy ses—particularly those related to fire safety and ev acuation—were ev aluated and relied upon.
Ac cess to this information supports informed public participation and confidence in the dec isio n-making proc ess.
Conclusion
This response is not intended to restate the full appeal, but rather to highlight a set of focused consideratio ns that remain unresolv ed in the dministrativ e record. Taken together, these issues raise important questions about whether the Projec t was rev iewed and appro ved based on a complete and procedurally consistent framework.
At minimum, the record reflects:
Approv al prior to com pletion of a com prehensiv e ev acuation analy sis Lim itations on meaningful public participation during deliberation Inc onsistenc ies in core projec t data
Dev iations from standard procedural practic es
For these reasons, I respectfully request that the Council grant the appeal, or at minimum, remand the matter for further analy sis and proc edural clarific ation to ensure that the decision is based on a complete and consistent rec ord.
This correspondenc e is submitted to ensure the administrativ e record ac curately reflec ts the pro cedural and analy tic al issues raised prior to final action.
Respectfully Submitted,
Shelly Robbins
shelly.n.robbins@gmail. com
81 41 E. Kennedy Rd, Anaheim, CA
ate: 3/21/2026 4:50:09 PM
From:" S R" [email protected]
To:" Natalie Rubalcava" [email protected], " Public Comment" publiccomme nt@anahe im.net Cc:" City Clerk" [email protected]
Subject:[
EXTERNAL] Meeting 3-24-26 Agenda Items 24 & 25 – Anaheim Hills Festival Project (DEV2023-00043) – Response to Rehearing Denial and Related Actions
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: 3/ 21 /26
Honorable Councilmember Rubalcav a,
Thank you for your continued time and attention to this matter. I rec ognize the complex ity of the considerations before you and the many perspec tiv es inv olv ed. This response is offered in good faith and is intended to highlight a small number of pro cedural and analy tic al considerations that may benefit from further clarification to support a fully informed decisio n.
1. Incomplete Wildfire Evacuation Analysis
The City acknowledges that a comprehensiv e wildfire ev acuation plan is currently in dev elopment, yet the Projec t was appro ved prio r to completion of that analy sis. This raises a fundamental conc ern under CEQA, which requires dec isio ns to be based on the best av ailable information—particularly where public safety is at stake.
The ev ac uation analy sis relied upon in the EI R does not appear to incorporate:
Updated regional traffic conditions
Real- world human behav ior during emergenc y ev acuations Cumulativ e impacts across known bottlenecks and constrained evacuation routes Approv ing the Projec t while a City -initiated ev ac uation study remains incomplete creates a disc onnec t between ac knowledged risk and the conclusions relied upon for approv al.
2. Procedural Limitations on Public Participation
The administrativ e record reflects that the public hearing was formally closed on January 1 3, 20 26, while deliberations and consideratio n of the Projec t continued thereafter. Although general public comment was permitted at subsequent meetings, this is no t equiv alent to partic ipation within an open public hearing tied to ac tiv e deliberation.
This distinc tion matters. Meaningful partic ipation under CEQA is intended to occ ur within the dec ision- making framewo rk itself, where public input can direc tly inform the outc ome. The struc ture used here limited that opportunity .
3. Departure from Adopted Public Comment Procedures
The Project inv olv ed legislativ e components, yet public comment was limited to three minutes per speaker without a clear ex planation in the record for dev iating from the City ’s standard fiv e-minute alloc ation for legislativ e matters.
Adherenc e to established proc edures is essential to maintaining consistenc y and public trust. Where dev iations occur, the basis for tho se decisions should be clearly doc umented.
4. Inconsistent Project Description – Parking Discrepancy The administrativ e record contains conflic ting information regarding required parking:
Draft EIR: 1 ,07 5 spaces
Parking Study : 963 spaces
While this disc repancy has been acknowledged, it does not appear to hav e been fully reconc iled in the rec ord. A stable and internally consistent projec t desc ription is foundational under CEQA , as it directly informs the analy sis and the findings relied upon for appro val.
5. Access to Information and Transparency
Certain materials requested during the rev iew proc ess, including internal communications and technic al ev aluations, were not made av ailable.
These materials are relev ant to understanding how key analy ses—particularly those related to fire safety and ev acuation—were ev aluated and relied upon.
Ac cess to this information supports informed public participation and confidence in the dec isio n-making proc ess.
Conclusion
This response is not intended to restate the full appeal, but rather to highlight a set of focused consideratio ns that remain unresolv ed in the administrativ e record. Taken together, these issues raise important questions about whether the Projec t was rev iewed and appro ved based on complete and procedurally consistent framework.
At minimum, the record reflects:
Approv al prior to com pletion of a com prehensiv e ev acuation analy sis Lim itations on meaningful public participation during deliberation Inc onsistenc ies in core projec t data
Dev iations from standard procedural practic es
For these reasons, I respectfully request that the Council grant the appeal, or at minimum, remand the matter for further analy sis and proc edural clarific ation to ensure that the decision is based on a complete and consistent rec ord.
This correspondenc e is submitted to ensure the administrativ e record ac curately reflec ts the pro cedural and analy tic al issues raised prior to final action.
Respectfully Submitted,
Shelly Robbins
shelly.n.robbins@gmail. com
81 41 E. Kennedy Rd, Anaheim, CA
ate: 3/21/2026 4:52:48 PM
From:" S R" [email protected]
To:" Norma C. Kurtz" [email protected], " Public Comment" publiccomment@anahe im.net Cc:" City Clerk" [email protected]
Subject:[
EXTERNAL] Meeting 3-24-26 Agenda Items 24 & 25 – Anaheim Hills Festival Project (DEV2023-00043) – Response to Rehearing Denial and Related Actions
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: 3/ 21 /26
Honorable Councilmember Campos Kurtz,
Thank you for your time and thoughtful consideration of this matter. Giv en the importanc e of ensuring a complete and consistent record, particularly on issues related to public safety . This response is offered in good faith to highlight a few key proc edural and analy tic al considerations that remain relev ant to the decision before you.
1. Incomplete Wildfire Evacuation Analysis
The City acknowledges that a comprehensiv e wildfire ev acuation plan is currently in dev elopment, yet the Projec t was appro ved prio r to completion of that analy sis. This raises a fundamental conc ern under CEQA, which requires dec isio ns to be based on the best av ailable information—particularly where public safety is at stake.
The ev ac uation analy sis relied upon in the EI R does not appear to incorporate:
Updated regional traffic conditions
Real- world human behav ior during emergenc y ev acuations Cumulativ e impacts across known bottlenecks and constrained evacuation routes Approv ing the Projec t while a City -initiated ev ac uation study remains incomplete creates a disc onnec t between ac knowledged risk and the conclusions relied upon for approv al.
2. Procedural Limitations on Public Participation
The administrativ e record reflects that the public hearing was formally closed on January 1 3, 20 26, while deliberations and consideratio n of the Projec t continued thereafter. Although general public comment was permitted at subsequent meetings, this is no t equiv alent to partic ipation within an open public hearing tied to ac tiv e deliberation.
This distinc tion matters. Meaningful partic ipation under CEQA is intended to occ ur within the dec ision- making framewo rk itself, where public input can direc tly inform the outc ome. The struc ture used here limited that opportunity .
3. Departure from Adopted Public Comment Procedures
The Project inv olv ed legislativ e components, yet public comment was limited to three minutes per speaker without a clear ex planation in the record for dev iating from the City ’s standard fiv e-minute alloc ation for legislativ e matters.
Adherenc e to established proc edures is essential to maintaining consistenc y and public trust. Where dev iations occur, the basis for tho se decisions should be clearly doc umented.
4. Inconsistent Project Description – Parking Discrepancy The administrativ e record contains conflic ting information regarding required parking:
Draft EIR: 1 ,07 5 spaces
Parking Study : 963 spaces
While this disc repancy has been acknowledged, it does not appear to hav e been fully reconc iled in the rec ord. A stable and internally consistent projec t desc ription is foundational under CEQA , as it directly informs the analy sis and the findings relied upon for appro val.
5. Access to Information and Transparency
Certain materials requested during the rev iew proc ess, including internal communications and technic al ev aluations, were not made av ailable.
These materials are relev ant to understanding how key analy ses—particularly those related to fire safety and ev acuation—were ev aluated and relied upon.
Ac cess to this information supports informed public participation and confidence in the dec isio n-making proc ess.
Conclusion
This response is not intended to restate the full appeal, but rather to highlight a set of focused consideratio ns that remain unresolv ed in the administrativ e record. Taken together, these issues raise important questions about whether the Projec t was rev iewed and appro ved based on complete and procedurally consistent framework.
At minimum, the record reflects:
Approv al prior to com pletion of a com prehensiv e ev acuation analy sis Lim itations on meaningful public participation during deliberation Inc onsistenc ies in core projec t data
Dev iations from standard procedural practic es
For these reasons, I respectfully request that the Council grant the appeal, or at minimum, remand the matter for further analy sis and proc edural clarific ation to ensure that the decision is based on a complete and consistent rec ord.
This correspondenc e is submitted to ensure the administrativ e record ac curately reflec ts the pro cedural and analy tic al issues raised prior to final action.
Respectfully Submitted,
Shelly Robbins
shelly.n.robbins@gmail. com
81 41 E. Kennedy Rd, Anaheim, CA
ate: 3/21/2026 4:54:50 PM
From:" S R" [email protected]
To:" Natalie Meeks" [email protected], " Public Comment" publiccomme nt@anahe im.net Cc:" City Clerk" [email protected]
Subject:[
EXTERNAL] Meeting 3-24-26 Agenda Items 24 & 25 – Anaheim Hills Festival Project (DEV2023-00043) – Response to Rehearing Denial and Related Actions
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: 3/ 21 /26
Honorable Councilmember Meeks,
Thank you for your time and continued engagement on this matter. I recognize the lev el of community interest and the respo nsibility inv olv ed in weighing complex decisions that affect both current and future residents. This response is offered in good faith to highlight sev eral foc used considerations that may support a clear and well- supported path forward.
1. Incomplete Wildfire Evacuation Analysis
The City acknowledges that a comprehensiv e wildfire ev acuation plan is currently in dev elopment, yet the Projec t was appro ved prio r to completion of that analy sis. This raises a fundamental conc ern under CEQA, which requires dec isio ns to be based on the best av ailable information—particularly where public safety is at stake.
The ev ac uation analy sis relied upon in the EI R does not appear to incorporate:
Updated regional traffic conditions
Real- world human behav ior during emergenc y ev acuations Cumulativ e impacts across known bottlenecks and constrained evacuation routes Approv ing the Projec t while a City -initiated ev ac uation study remains incomplete creates a disc onnec t between ac knowledged risk and the conclusions relied upon for approv al.
2. Procedural Limitations on Public Participation
The administrativ e record reflects that the public hearing was formally closed on January 1 3, 20 26, while deliberations and consideratio n of the Projec t continued thereafter. Although general public comment was permitted at subsequent meetings, this is no t equiv alent to partic ipation within an open public hearing tied to ac tiv e deliberation.
This distinc tion matters. Meaningful partic ipation under CEQA is intended to occ ur within the dec ision- making framewo rk itself, where public input can direc tly inform the outc ome. The struc ture used here limited that opportunity .
3. Departure from Adopted Public Comment Procedures
The Project inv olv ed legislativ e components, yet public comment was limited to three minutes per speaker without a clear ex planation in the record for dev iating from the City ’s standard fiv e-minute alloc ation for legislativ e matters.
Adherenc e to established proc edures is essential to maintaining consistenc y and public trust. Where dev iations occur, the basis for tho se decisions should be clearly doc umented.
4. Inconsistent Project Description – Parking Discrepancy The administrativ e record contains conflic ting information regarding required parking:
Draft EIR: 1 ,07 5 spaces
Parking Study : 963 spaces
While this disc repancy has been acknowledged, it does not appear to hav e been fully reconc iled in the rec ord. A stable and internally consistent projec t desc ription is foundational under CEQA , as it directly informs the analy sis and the findings relied upon for appro val.
5. Access to Information and Transparency
Certain materials requested during the rev iew proc ess, including internal communications and technic al ev aluations, were not made av ailable.
These materials are relev ant to understanding how key analy ses—particularly those related to fire safety and ev acuation—were ev aluated and relied upon.
Ac cess to this information supports informed public participation and confidence in the dec isio n-making proc ess.
Conclusion
This response is not intended to restate the full appeal, but rather to highlight a set of focused consideratio ns that remain unresolv ed in the administrativ e record. Taken together, these issues raise important questions about whether the Projec t was rev iewed and appro ved based on complete and procedurally consistent framework.
At minimum, the record reflects:
Approv al prior to com pletion of a com prehensiv e ev acuation analy sis Lim itations on meaningful public participation during deliberation Inc onsistenc ies in core projec t data
Dev iations from standard procedural practic es
For these reasons, I respectfully request that the Council grant the appeal, or at minimum, remand the matter for further analy sis and proc edural clarific ation to ensure that the decision is based on a complete and consistent rec ord.
This correspondenc e is submitted to ensure the administrativ e record ac curately reflec ts the pro cedural and analy tic al issues raised prior to final action.
Respectfully Submitted,
Shelly Robbins
shelly.n.robbins@gmail. com
81 41 E. Kennedy Rd, Anaheim, CA
ome people who received this message don't often get email from taluzzi@msn. com. Learn why this is important Date: 3/23/2026 9:42:25 AM
From:" Tina Aluzzi - Lounsbury" [email protected]
To:
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Ashleigh Aitken" [email protected], "Kristen Maahs" [email protected], "Natalie Meeks" [email protected], " Carlos A.
Leon" [email protected], "Ryan Balius" [email protected], "Natalie Rubalcava" [email protected], Jennifer Diaz" [email protected]
Subject:[
EXTERNAL] Comprehensive Follow-Up and Request for Reconsideration – Unresolve dPublic Safety, CEQA, and Safety Element Issues – Anaheim Hills Festival Center Project (DA 2023-00043 / FEIR No. 358) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Date: March 23, 2026
City of Anaheim
Mayor and Members of the City Council
200 S. Anaheim Boulevard
Anaheim, CA 92805
Via Email: publiccomment@anaheim. net; cityclerk@anaheim. net; aaitken@anaheim. net; kmaahs@anaheim. net; nmeeks@anaheim. net; cleon@anaheim. net; rbalius@anaheim. net; nrubalcava@anaheim. net; jdiaz@anaheim. net Subject: Comprehensive Follow-Up and Request for Reconsideration – Unresolved Public Safety, CEQA, and Safety Element Issues Anaheim Hills Festival Center Project (DA2023-00043 / FEIR No. 358) Mayor Aitken and Members of the City Council,
I respectfully submit this follow-up correspondence for inclusion in the administrative record regarding Development Application No. 2023- 00043 and Final Environmental Impact Report ( FEIR) No. 358.
This letter is intended to:
1. Reiterate and incorporate all prior objections and concerns submitted in my February 3, March 3, and March 5, 2026 letters
2. Address the lack of substantive response to those communications
3. Introduce new, material information regarding the City’s incomplete wildfire evacuation study
4. Request reconsideration or delay of final actions pending full and consistent safety analysis I. Lack of Response and Incomplete Administrative Record To date, I have not received a response to any of my letters addressing the detailed public health, wildfire evacuation, emergency response, and Safety Element concerns raised in prior correspondence.
Given the technical, legal, and life-safety nature of these issues, the absence of formal responses raises concern as to whether:
These issues have been fully evaluated
The administrative record adequately reflects them
Required findings are supported by substantial evidence II. Professional and Public Health Perspective
As a Registered Nurse (RN) and Public Health Nurse (PHN) with emergency department and critical care experience, my concerns are grounded in:
Emergency response operations
Hospital surge capacity
Disaster preparedness
Population-level risk assessment
Wildfire evacuation is not theoretical—it is a predictable, recurring public health emergency inAnaheim Hills.
III. Historical Wildfire Evidence and Known System Failures Anaheim Hills has experienced multiple significant wildfire events:
1982 Gypsum Canyon Fire
1993 Eastern Anaheim Hills Fire
2008 Freeway Complex Fire
2017 Canyon Fire 2
These events revealed consistent and documented vulnerabilities:
Limited evacuation routes
Congestion along Santa Ana Canyon Road
Evacuation bottlenecks
Delayed emergency response access
Simultaneous ingress/ egress conflicts
These are recurring structural conditions— not hypothetical scenarios.
IV. Fundamental Change inRisk Profile – Residential vs. Commercial Use The project replaces intermittent commercial use with 447 residential units, introducing:
A permanent 24-hour population
Sleeping residents during nighttime emergencies
Children, elderly, and medically fragile individuals
Mobility-limited residents requiring assistance
Oxygen- dependent and chronic illness populations
Unlike a theater, residential use creates:
Continuous evacuation demand
Increased EMS utilization
Greater reliance on emergency systems
This is a material and irreversible change inrisk conditions.
V. Emergency Medical and Healthcare System Impacts
From a clinical operations perspective:
During wildfire events:
EMS response times increase
Ambulance access is delayed
Hospitals experience surge conditions
Emergency departments may go on diversion
Shelters must support medically vulnerable populations
Wildfire smoke exposure leads to:
Asthma exacerbations
COPD decompensation
Increased cardiac events
Pediatric respiratory distress
Anxiety and panic- related emergencies
These are evidence- based public health impacts that scale with population density.
VI. Evacuation Modeling Limitations
The FEIR acknowledges:
Increased evacuation times
Significant unavoidable impacts
Reliance on a Statement of Overriding Considerations
However, evacuation models often fail to reflect real-world conditions:
Panic behavior
Disabled vehicles blocking lanes
Smoke-reduced visibility
Power outages
Nighttime evacuations
Simultaneous multi-neighborhood evacuation
Evacuation failure is nonlinear—once capacity is exceeded, congestion escalates rapidly.
VII. NEW MATERIAL ISSUE – Missing Wildfire Evacuation Study A critical issue now requires immediate attention:
The City’s Own Wildfire Evacuation Study Has Not Been Completed Approved: March 2025
Cost: $180,000
Expected completion: ~ 9 months
Status ( March 2026): Not delivered
Yet:
The Festival Project was approved without it
The project directly depends on evacuation safety analysis The study was intended to answer the very risks under consideration VIII. Inconsistency inDecision-Making
The administrative record indicates:
Evacuation conditions require further study
Yet the approval implies:
Sufficient information already exists
These positions are internally inconsistent and materially significant.
IX. Potential Conflict of Interest
The City’s evacuation study contractor: Dudek
The developer’ s evacuation consultant: Dudek
This raises legitimate concerns:
Independence of analysis
Objectivity of conclusions
Public confidence in findings
Even the appearance of conflict is problematic in a life-safety context.
X. Timing and Integrity of the Study
Approving the project prior to study completion:
Alters baseline conditions
Risks invalidating study conclusions
Undermines the purpose of the study
This creates a circular and compromised analytical framework.
XI. General Plan Safety Element and Legal Consistency
Under California law:
Gov. Code §65302(g): Safety Element must address wildfire and evacuation Gov. Code §65300.5: Internal consistency required
Key Safety Element principles:
Minimize wildfire exposure
Ensure evacuation capacity
Maintain emergency access
Avoid intensification without infrastructure support
Parcel-level compliance system-level safety
The City must demonstrate howthis project remains consistent with these policies.
XII. CEQA and Statement of Overriding Considerations
Under CEQA:
Significant impacts require substantial evidence
Overriding considerations must be supported
Here, the City overrides:
Increased evacuation times
Significant unavoidable impacts
Without the City’s own evacuation study, the evidentiary basis is incomplete.
XIII. Cumulative Risk and Infrastructure Timing
Infrastructure improvements extend to future years (e.g., 2029) Risk begins immediately upon occupancy
Cumulative development:
Incrementally increases evacuation demand
Pushes system toward threshold failure
Anaheim Hills may be approaching that threshold.
XIV. Legal, Fiscal, and Ethical Implications
Potential consequences include:
CEQA litigation
Challenges under Housing Accountability Act
Taxpayer- funded legal defense
Long-term infrastructure strain
If evacuation failure results in harm:
Consequences extend beyond legal compliance
Ethical responsibility becomes paramount
XV. Request for Council Action
In light of all prior and newly presented information, I respectfully request that the City Council:
1. Delay Final Approval Actions
Until the Wildfire Evacuation Study is completed and released
2. Integrate Study Findings
Into any final decision- making
3. Provide Formal Written Response
Addressing:
Evacuation capacity
Safety Element consistency
Role of incomplete study
4. Evaluate Rehearing / Reconsideration
Based on:
New material information
Incomplete record
Potential inconsistencies
XVI. Closing
This is not opposition to housing.
It is a request that decisions involving life safety be made with complete, consistent, and transpare nt analysis.
Approving high-density residential development in a wildfire- prone hillside community without the City’s own evacuation study is not consistent with:
Public health principles
Emergency preparedness standards
Sound planning practice
I respectfully urge the Council to take a measured, evidence- based approach before proceeding further.
Respectfully submitted,
Tina R. Aluzzi-Lounsbury, BSN, RN, PHN
Anaheim Hills Resident
The preceding email message ( including any attachments) may contain information that is confidential, protected, or constitute nonpublic information. It is intended to be conveyed only to the designated recipient( s). If you are not the intended recipient of this message, please notify the sender by replying to this message, and then delete it from your system. Use dissemination, distribution, or reproduction of this message by unintended recipients is not authorized and may be unlawful. ou don't often get email from arwinger@gmail. com. Learn why this is important Date: 3/23/2026 12:12:11 PM
From:" Andrew Winger" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected], Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected]
Subject:[ EXTERNAL] Rebuttal to Request for Rehearing fromPetitioner Attachment: Request for Rehearing Rebuttal March 24.2026.pdf; Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear City Council Members,
I submitted the Request for Rehearing, so as the Petitioner I would like this opportunity to address concerns.
Under normal circumstances, any of the 6 points raised as reasons to request a rehearing would be sufficient to grant one. Combined they make a compelling case.
After reading the document published by the City with regards to denying the Request for Rehearing, I think you need to take a serious look at 3 of the strongest unresolved issues from the response.
Summarized below (Attached . pdf explains issues in detail):
Issue 1 – Wildfire Evacuation / CEQA
The City approved the project while simultaneous ly conducting a comprehens ive wildfire evacuation study—essentially admitting it did not yet fully unders tand evacuation risks in the area . The project directly affects the same evacuation routes and conditions that the study is evaluating .
CEQA requires decisions to be based on the best available information. Here, the City knew critical data was actively being developed but chose to proceed without it. A project-level analysis cannot replace a system-wide evacuation study. Approving the project under these circums tances raises serious concerns that the decision was made without a complete understanding of public safety risks .
Issue 2 – Labor Negotiations Influence
The City’s response focuses on the absence of a written requirement for union labor. But that misses the real issue: whether labor negotiations influenced the approval in practice. Federal law prohibits local governments from interfering in labor decisions —even indirectly.
The record raises legitimate concerns . A councilmember publicly linked their support to labor engagement, and a labor agreement was finalized while the project was under consideration. Even if unwritten, such influence may still be improper. The City has not addressed whether the approval depended on that agreement, leaving a significant legal question unresolved.
Video support: https ://www.youtube.com/watch?v=89V2foY9zKc Issue 6 – Fair Hearing / Due Process
The core problem is timing and fairness . The City closed the formal public hearing on January 13, but continued deliberating and considering new developments for weeks afterward—ultimately making its decision on March 3. During that period, the public had no opportunity to respond within the formal hearing process , only through general comment, which is not equivalent.
This created a clear imbalance: the project continued evolving , but the public was locked out of meaningful participation. Due proces s requires that when new information or continued deliberation occurs , the hearing be reopened. That didn’t happen here, undermining the fairness and legality of the process .
I appreciate your consideration of this ,
Andrew Winger
Request for Rehearing Rebuttal: March 24, 2026
Formal Rebuttal
Request for Rehearing
Meeting on March 24, 2026
Anaheim Hills Festival Project
DEV2023-00043
Prepared Submission
Request for Rehearing Rebuttal: March 24, 2026
Issue #1: Failure to Consider Material
Wildfire Evacuation Information
I. The City’s Response Frames the Issue Too Narrowly
The City argues that the Environmental Impact Report (EIR) properly evaluated wildfire evacuation conditions based on the information available at the time of the Notice of Preparation (NOP), and that it was not obligated to delay approval until completion of the Citywide Wildfire Evacuation Plan.
That framing misses the point.
While CEQA analysis is typically based on information available during environmental review, that does not allow the City to ignore relevant information that is actively being developed—especially when it directly relates to the impacts at issue. The question here isn’t whether the City had to wait indefinitely, but whether it moved forward despite knowing that critical evacuation data was in progress and unfinished.
II. The City Itself Recognized Gaps in Existing Evacuation Analysis The City chose to initiate a comprehensive wildfire evacuation study, secured funding for it, and began work before approving the Project. That decision matters.
It shows the City understood that current information about evacuation conditions—particularly in Anaheim Hills— was not complete. Otherwise, there would be no need for the study.
This creates a clear inconsistency: the City acknowledged the need for deeper analysis, yet approved a project that will directly affect evacuation conditions before that analysis was finished or reviewed.
III. The Project Directly Affects What the Study Is Evaluating The Festival Project increases residential density, adds traffic, and relies on the same evacuation routes currently under study.
These are not tangential issues— they go to the heart of what the Wildfire Evacuation Plan is supposed to evaluate: whether residents can safely evacuate during a wildfire.
Approving a project that changes those conditions while the City is still trying to understand them raises a basic concern: the decision may have been made without a full picture of the risks.
IV. A Project-Level Study Is Not a Substitute for System-Wide Analysis The City points to a project-specific evacuation analysis and notes that it was peer-reviewed.
Request for Rehearing Rebuttal: March 24, 2026
That may be true, but it doesn’t resolve the issue.
Project-level studies operate within a defined scope and set of assumptions. They are not designed to evaluate broader, system-wide evacuation capacity. The City’s own wildfire plan, on the other hand, is intended to do exactly that—using more comprehensive data and a wider lens.
Moving forward without that broader analysis risks relying on a narrower and potentially incomplete understanding of evacuation conditions.
V. CEQA Requires Agencies to Use the Best Information Reasonably Available CEQA does not require agencies to wait forever for future studies. But it also does not allow them to disregard material information that is actively being developed and directly relevant.
Here, the City knew:
A comprehensive evacuation study was underway
The study addressed the same conditions affected by the Project The results had not yet been completed or reviewed
Under those circumstances, itis fair to question whether the City relied on the most complete and reliable information available before approving the Project.
VI. Calling the Ongoing Study “ Speculative” Doesn’ t Hold Up The City characterizes the evacuation plan as speculative because it is not finalized.
But this is not a hypothetical study—itis funded, underway, and specifically designed to address evacuation risks in areas like Anaheim Hills. Its completion is expected, not uncertain.
Dismissing it as speculative minimizes its significance. In reality, it is a concrete effort to answer the exact questions raised by this Project.
VII. Proceeding Without This Information Raises Serious Concerns A prejudicial abuse of discretion can occur when an agency fails to follow required procedures or makes a decision unsupported by substantial evidence.
By approving the Project while acknowledging that key evacuation analysis was still incomplete—and without incorporating those forthcoming findings—the City risks having made a decision without fully informing itself.
That undermines confidence in the environmental review process and warrants reconsideration.
Request for Rehearing Rebuttal: March 24, 2026
VIII. Conclusion
At its core, this issue is about timing and information.
The City moved forward with approval while simultaneously working to better understand the very evacuation conditions affected by the Project. That disconnect raises legitimate concerns about whether the decision was based on a complete and accurate understanding of wildfire risk.
For that reason, a rehearing is appropriate to ensure the Project is evaluated using the most complete and reliable information available.
Request for Rehearing Rebuttal: March 24, 2026
Issue #2: Consideration of Labor
Negotiations in Project Approval
I. The City Frames the Issue Too Narrowly
The City’ s response focuses on the claim that union labor was not formally required as part of the Development Agreement. That framing does not address the actual concern raised in the request for rehearing.
The issue is not whether a written condition appears in the agreement. The question is whether approval of the project was, in practice, influenced—directly or indirectly—by the status or outcome of private labor negotiations. A public agency cannot avoid scrutiny simply because a condition was not reduced to writing ifthe record suggests it played a role in the decision-making process.
II. Federal Law Prohibits Government Interference in Labor Decisions Federal labor law draws a clear line. Under doctrines such as Machinists preemption, local governments are prohibited from inserting themselves into areas that Congress intended to leave to the free play of economic forces.
Decisions about whether to use union or non-union labor—and the terms of those agreements— fall squarely within that protected space. This limitation applies not only to explicit mandates, but also to subtler forms of influence, including pressure tied to discretionary approvals.
III. The Relevant Inquiry Is What Occurred in Practice
What matters is not just what was written, but what actually occurred.
The administrative record raises legitimate concerns on that front. A councilmember publicly connected their support for the project to the developer’ s engagement with organized labor. Discussions regarding labor agreements took place alongside deliberations over project approval. Additionally, a Memorandum of Understanding with a union was finalized during the same timeframe that the Council was considering its decision.
Taken together, these facts raise a central question: was the project approved based solely on traditional land- use considerations, or did the outcome of private labor negotiations play a role?
Request for Rehearing Rebuttal: March 24, 2026
IV. The Absence of a Written Condition Does Not Resolve the Issue The City relies on the absence of a formal requirement in the Development Agreement. However, the law does not turn on whether a condition is written down.
A decision may be improperly influenced even when the relevant factor is informal, implied, or understood. If a decision-maker signals that their vote is contingent on a labor agreement, and that agreement is then reached prior tofinal approval, it is reasonable to question whether the approval was based solely on permissible considerations.
V. The City’ s Response Leaves Critical Questions Unanswered The City’ s response does not meaningfully address key issues, including:
Whether councilmembers relied on the existence of a labor agreement in casting their votes Whether the project would have been approved absent such an agreement How the timing of the Memorandum of Understanding factored into the decision These are not peripheral concerns—they go directly to whether the process complied with governing law.
VI. Applicable Legal Standard
Under Code of Civil Procedure section 1094.5, a decision constitutes a prejudicial abuse of discretion ifit is based on improper considerations or if the agency fails to proceed in the manner required by law.
If project approval was influenced by labor negotiations that fall within an area preempted by federal law, that standard may be satisfied.
VII. Conclusion
This issue warrants further examination. A rehearing is both appropriate and necessary to ensure that the City’s decision was grounded exclusively in legitimate land-use considerations and free from impermissible influences.
Because the City’ s response does not fully address these concerns, denying rehearing would leave a significant legal issue unresolved. The request should therefore be granted.
Request for Rehearing Rebuttal: March 24, 2026
Issue #6: Denial of a Fair Hearing
I. The City Treats Public Comment as a Substitute for a Formal Hearing The City’ s response suggests that a fair hearing occurred because the public was allowed to speak at later meetings and submit written comments.
But that misses the point. Those are not the same thing as a formal public hearing, and they shouldn’t be treated as interchangeable.
A formal hearing is where evidence is presented, testimony is structured, and the official record is built. It allows for clarification, follow-up, and meaningful engagement with the issues that actually matter to the decision.
General public comment is different. It’s more limited, less structured, and doesn’ t provide the same opportunity to engage with the substance of what’ s being decided.
Relying on general comment as a substitute for reopening the hearing is not adequate.
II. The City Continued Deliberating After Closing the Hearing The public hearing was closed on January 13, 2026. But the decision-making process didn’t stop there.
The City Council continued discussing the project over multiple meetings, considered new developments—including the status of a labor agreement— and ultimately made its final decision on March 3, 2026.
In other words, the process was still active and evolving after the hearing was closed.
When that happens— when new information and ongoing deliberation continue after a hearing ends— basic fairness requires reopening the hearing so the public can respond within the proper framework.
That didn’t happen here.
Instead, the hearing stayed closed, and the public was limited to general comment, even as important developments continued to unfold.
III. Allowing Public Comment Did Not Fix the Problem
The City points to the number of participants— 111 speakers and 522 emails— as evidence that the public had an opportunity to be heard.
But this isn’t about volume. It’s about whether the process itself was fair.
Request for Rehearing Rebuttal: March 24, 2026
The key question is whether the public had a meaningful opportunity to participate at the right time and in the right setting.
General comment doesn’t allow people to respond to new developments in a structured way. It doesn’ t provide an opportunity to formally rebut new information. And it doesn’t ensure that what’ s said is treated as part of the official evidentiary record in the same way as hearing testimony.
So while people were able to speak, their ability to meaningfully influence the outcome was limited.
IV. The Process Was Not Evenly Balanced
There was also a clear imbalance in how the process unfolded.
During the deliberation period, the applicant was able to continue engaging with the City, and developments related to the project—including the labor agreement— continued to take shape.
Meanwhile, the public had no comparable opportunity to respond within the formal hearing process.
That creates a situation where one side can continue shaping the outcome, while the other is restricted to a less effective channel. That kind of imbalance raises serious concerns about fairness.
V. The Timing of the Decision Shows Prejudice
The City argues that no prejudice has been shown.
But prejudice exists when a procedural flaw prevents meaningful participation, and the decision is made after that flaw occurs.
That’ s exactly what happened here.
Deliberations continued for weeks after the hearing was closed. Relevant developments occurred during that time. And the final vote took place without ever reopening the hearing.
Under those circumstances, it’s not necessary to prove the outcome would have changed—only that the public was denied a fair chance to influence it.
That standard is clearly met.
VI. The City Did Not Follow Required Procedures
A fair hearing isn’tjust about allowing comments. It requires a proper process.
That includes a structured forum, an opportunity to respond to new developments, and a decision based on a complete and fairly developed record.
Request for Rehearing Rebuttal: March 24, 2026
By closing the hearing too early and refusing to reopen it as the situation evolved, the City failed to follow that process.
This amounts to a prejudicial abuse of discretion under Code of Civil Procedure §1094.5.
VII. Conclusion
The core issue remains unaddressed: the hearing was closed while the decision-making process was still ongoing.
Allowing general public comment did not provide an equivalent or legally sufficient opportunity for participation.
Because the public was denied a meaningful chance to engage at a critical stage, the integrity of the process is in question.
For these reasons, the Request for Rehearing should be granted. ou don't often get email from gracebranche@yahoo. com. Learn why this is important Date: 3/23/2026 12:27:43 PM
From:" Grace Branche" gracebranche@yahoo. com
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Concerns Regarding Traffic and Evacuation Analysis for Festival Project Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Mayor and Members of the City Council,
Ahead of your March 24 consideration of the Festival project rehearing, I would like to restate my concerns regarding both traffic conditions and emergency evacuation planning in Anaheim Hills.
At the core, I am not confident that the current traffic and evacuation analyses accurately reflect present- day conditions. The assumptions being used appear disconnected from what residents are experiencing on a daily basis.
The former theater at the project site has not operated consistently for some time. Even when it was active, its impact on traffic was limited and largely local. The proposed development, however, would introduce a continuous and significantly higher volume of traffic into an area that is already heavily congested.
Having lived here for about five years, I have seen a clear and steady decline in traffic conditions. What may have once been occasional congestion has become a daily reality. Any analysis that relies on idealized flow patterns or non-peak scenarios does not match the actual conditions residents face.
This issue becomes even more critical when considering emergency evacuation. Wildfires do not occur on a predictable schedule, and an evacuation during peak traffic hours would present serious risks. While I recognize the City’s efforts to improve emergency readiness since 2017, the “Know Your Way” approach has not been demonstrated under the most demanding, real-world conditions. Accounts from residents who experienced the Canyon Fire highlight how quickly evacuation routes can become overwhelmed.
Before moving forward with additional development in a high fire-risk area already burdened by traffic constraints, I strongly urge the Council to require a more rigorous, scenario- based analysis— one that evaluates evacuation capacity during peak congestion rather than relying on averaged or theoretical conditions.
I would also appreciate clarification regarding how this proposal differs from past decisions. The SALT project at Deer Canyon was denied in part due to concerns about traffic and infrastructure strain in this same area. From a resident’ s perspective, the Festival project raises many of the same issues. If there are meaningful distinctions that change the level of risk, it would be helpful for the community to understand them.
Lastly, I encourage you to carefully consider the input of the residents you represent. Many District 6 residents have consistently voiced concerns about traffic and evacuation safety— concerns grounded in daily experience and public safety realities. As both Mayor and our District 6 representative, your role is especially important in ensuring these perspectives are fully considered before any final decisions are made.
This is not opposition to development itself, but a request that decisions— particularly those involving evacuation safety— are made with thorough and realistic analysis. Given the increasing frequency and severity of wildfire risk, this issue warrants careful and deliberate attention.
Thank you for your time and consideration.
Sincerely,
Grace Branche
ou don't often get email from concernedanaheimresidents@gmail. com. Learn why this is important Date: 3/23/2026 3:57:13 PM
From:" Concerned AnaheimResidents" concernedanaheimresidents@gmail. com To:
Ashleigh Aitken" [email protected], " Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected], " Norma C. Kurtz" [email protected], Kristen Maahs" [email protected], "Natalie Meeks" [email protected], " Public Comment" publiccomment@anaheim. net
Cc:" City Clerk" [email protected]
Subject:[ EXTERNAL] Request for Clarification onAppeal Issues – Festival Project (DEV2023-00043) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Mayor and Council Members,
Ahead of the March 24 meeting, I am writing to request clarification on several significant issues raised in the Request for Rehearing and supporting materials.
These questions reflect concerns already raised on the record by residents and outlined in detail in the appeal. Given their direct impact on public safety and procedural integrity, it is important that they are clearly addressed prior to any final decision.
1. Wildfire Evacuation & CEQA
How did the City determine that it had sufficient information to approve the project while a comprehensive wildfire evacuation study— addressing the same conditions— was still underway?
What analysis demonstrates that a project- level evacuation review adequately accounts for system-wide evacuation capacity? How were real-world conditions, including existing bottlenecks and congestion, incorporated into the evaluation of evacuation feasibility?
2. Consideration of Labor Negotiations
Can the Council clarify whether the existence or timing of any labor agreements was considered— formally or informally— in the decision to approve the project?
Would the project have been approved under the same conditions ifno such agreement had been reached? How does the City ensure that discretionary land- use decisions remain based solely on appropriate planning considerations?
3. Fair Hearing & Due Process
Why was the formal public hearing not reopened after January 13, despite continued deliberations and the introduction of new developments?
How does the City distinguish general public comment from formal hearing testimony in terms of its role in the administrative record? What opportunity did the public have to formally respond to developments that occurred after the hearing was closed?
4. Completeness of the Record & Public Access
Where can the public find complete and up-to-date documentation reflecting the full deliberation process, including developments that occurred after the hearing was closed?
How does the City ensure that the administrative record reflects all relevant information considered in its decision- making? When key public records and meeting documentation are delayed or incomplete, how is the public expected to meaningfully engage with and understand the process?
5. Alignment Between the Appeal and the City’s Response The Request for Rehearing provided detailed, issue- specific analysis, including factual context around evacuation conditions, roadway constraints, and known bottlenecks affecting real-world traffic flow.
In contrast, the City’s response appears to address several of these issues at a more generalized level.
The appeal raised concerns about how real-world evacuation conditions— such as existing bottlenecks, roadway limitations, and congestion patterns— affect evacuation feasibility, while the City’s response appears to rely on broader conclusions without clearly demonstrating how those specific conditions were evaluated.
he appeal identified ongoing developments and evolving conditions, including active studies and post- hearing changes, while the City’s response does not clearly indicate how those factors were incorporated into the final decision.
The appeal raised process- level concerns about timing, participation, and the completeness of the record, while the City’s response appears to focus on procedural sufficiency without directly addressing whether the process allowed for meaningful engagement with new information.
These distinctions are important, as they go to whether the substance and level of detail in the appeal were fully considered.
Can the Council identify where in the administrative record the specific, detailed concerns raised in the appeal are directly addressed, rather than summarized at a broader level?
How did the City determine that its response fully engaged with the depth and specificity of the issues raised— particularly those involving real-world conditions and infrastructure constraints?
Given the level of detail provided inthe Request for Rehearing, can the Council explain howthe materials were reviewed, what criteria were used to determine that the issues raised did not warrant further consideration, and where inthe record the public can see howthat review was conducted and howspecific concerns were evaluated? Given the level of detail provided inthe appeal, ensuring that each issue is directly and specifically addressed would help clarify how the City determined that no further review was warranted.
Supporting Images – Real-World Conditions
Attached images reflect observed, real-world conditions in and around the project site, including:
Parking demand at or near capacity during typical peak hours Congestion along primary access and evacuation routes
Bottlenecks and constrained traffic flow at key intersections These conditions are directly relevant to the evaluation of evacuation feasibility, infrastructure capacity, and traffic impacts discussed above.
Image 1 – Wide Parking Conditions
Wide view of parking demand at the project site during typical peak conditions, illustrating sustained high utilization across the lot.
Image 2 – Parking at Capacity
Festival shopping center parking conditions during peak evening hours ( approx. 7:20 PM), showing near full capacity. mage 3 – Traffic Congestion
Observed congestion along primary access and evacuation routes (Weir Canyon Rd heading toward 91fwy), showing limited vehicle throughput during peak hours.
Image 4 – Intersection Constraint
Intersection congestion despite active signal (On Weir Canyon & Monte Vista Rd), illustrating constrained traffic flow and delayed clearing.
Closing
Many of these questions still lack clear, documented answers.
If these issues have already been addressed, I would appreciate being directed to where in the record those responses can be found.
Addressing these questions prior to any final vote would help ensure that the Council’ s decision reflects a complete, transparent, and fully informed understanding of both the impacts and the concerns raised by the community.
Thank you for your time and consideration.
Sincerely ,
Shelly Robbins
8141 E . Kennedy Rd, Anaheim, CA 92808
ate: 3/23/2026 5:18:44 PM
From:" TimOlaerts" [email protected]
To:
Ashleigh Aitken" [email protected], " Natalie Meeks" NMeeks@anahe im.net, "Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], " Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, "Jennifer Diaz" [email protected], "Kristen Maahs" [email protected]
Subject:[ EXTERNAL] Reconsider Festival Center Decision Attachment: Request for Rehearing Rebuttal March 24.2026.pdf; You don' t often get email from tolaerts@att. net. Learn why this is important at https:// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outside the City of Anaheim. Do not click links or open attachments unless you recognize the sender and are expecting the message.
Hello,
I am writing to you with the ask that you reconsider the previous conclusions reached regarding the festival center proposal. This I am requesting a Request for Rehearing.
I believe there are resident concerns, aspects of the process, and flawed assumptions which substitute this request.
Please see the attached for further details.
Pretend like you and your family live in this impacted area. I think if this were your family and your house you would see that the risks are real and the proposal should be denied.
Thank you
Tim Olaerts
Sent from my iPhone
Request for Rehearing Rebuttal: March 24, 2026
Formal Rebuttal
Request for Rehearing
Meeting on March 24, 2026
Anaheim Hills Festival Project
DEV2023-00043
Prepared Submission
Request for Rehearing Rebuttal: March 24, 2026
Issue #1: Failure to Consider Material
Wildfire Evacuation Information
I. The City’s Response Frames the Issue Too Narrowly
The City argues that the Environmental Impact Report (EIR) properly evaluated wildfire evacuation conditions based on the information available at the time of the Notice of Preparation (NOP), and that it was not obligated to delay approval until completion of the Citywide Wildfire Evacuation Plan.
That framing misses the point.
While CEQA analysis is typically based on information available during environmental review, that does not allow the City to ignore relevant information that is actively being developed—especially when it directly relates to the impacts at issue. The question here isn’t whether the City had to wait indefinitely, but whether it moved forward despite knowing that critical evacuation data was in progress and unfinished.
II. The City Itself Recognized Gaps in Existing Evacuation Analysis The City chose to initiate a comprehensive wildfire evacuation study, secured funding for it, and began work before approving the Project. That decision matters.
It shows the City understood that current information about evacuation conditions—particularly in Anaheim Hills— was not complete. Otherwise, there would be no need for the study.
This creates a clear inconsistency: the City acknowledged the need for deeper analysis, yet approved a project that will directly affect evacuation conditions before that analysis was finished or reviewed.
III. The Project Directly Affects What the Study Is Evaluating The Festival Project increases residential density, adds traffic, and relies on the same evacuation routes currently under study.
These are not tangential issues— they go to the heart of what the Wildfire Evacuation Plan is supposed to evaluate: whether residents can safely evacuate during a wildfire.
Approving a project that changes those conditions while the City is still trying to understand them raises a basic concern: the decision may have been made without a full picture of the risks.
IV. A Project-Level Study Is Not a Substitute for System-Wide Analysis The City points to a project-specific evacuation analysis and notes that it was peer-reviewed.
Request for Rehearing Rebuttal: March 24, 2026
That may be true, but it doesn’t resolve the issue.
Project-level studies operate within a defined scope and set of assumptions. They are not designed to evaluate broader, system-wide evacuation capacity. The City’s own wildfire plan, on the other hand, is intended to do exactly that—using more comprehensive data and a wider lens.
Moving forward without that broader analysis risks relying on a narrower and potentially incomplete understanding of evacuation conditions.
V. CEQA Requires Agencies to Use the Best Information Reasonably Available CEQA does not require agencies to wait forever for future studies. But it also does not allow them to disregard material information that is actively being developed and directly relevant.
Here, the City knew:
A comprehensive evacuation study was underway
The study addressed the same conditions affected by the Project The results had not yet been completed or reviewed
Under those circumstances, itis fair to question whether the City relied on the most complete and reliable information available before approving the Project.
VI. Calling the Ongoing Study “ Speculative” Doesn’ t Hold Up The City characterizes the evacuation plan as speculative because it is not finalized.
But this is not a hypothetical study—itis funded, underway, and specifically designed to address evacuation risks in areas like Anaheim Hills. Its completion is expected, not uncertain.
Dismissing it as speculative minimizes its significance. In reality, it is a concrete effort to answer the exact questions raised by this Project.
VII. Proceeding Without This Information Raises Serious Concerns A prejudicial abuse of discretion can occur when an agency fails to follow required procedures or makes a decision unsupported by substantial evidence.
By approving the Project while acknowledging that key evacuation analysis was still incomplete—and without incorporating those forthcoming findings—the City risks having made a decision without fully informing itself.
That undermines confidence in the environmental review process and warrants reconsideration.
Request for Rehearing Rebuttal: March 24, 2026
VIII. Conclusion
At its core, this issue is about timing and information.
The City moved forward with approval while simultaneously working to better understand the very evacuation conditions affected by the Project. That disconnect raises legitimate concerns about whether the decision was based on a complete and accurate understanding of wildfire risk.
For that reason, a rehearing is appropriate to ensure the Project is evaluated using the most complete and reliable information available.
Request for Rehearing Rebuttal: March 24, 2026
Issue #2: Consideration of Labor
Negotiations in Project Approval
I. The City Frames the Issue Too Narrowly
The City’ s response focuses on the claim that union labor was not formally required as part of the Development Agreement. That framing does not address the actual concern raised in the request for rehearing.
The issue is not whether a written condition appears in the agreement. The question is whether approval of the project was, in practice, influenced—directly or indirectly—by the status or outcome of private labor negotiations. A public agency cannot avoid scrutiny simply because a condition was not reduced to writing ifthe record suggests it played a role in the decision-making process.
II. Federal Law Prohibits Government Interference in Labor Decisions Federal labor law draws a clear line. Under doctrines such as Machinists preemption, local governments are prohibited from inserting themselves into areas that Congress intended to leave to the free play of economic forces.
Decisions about whether to use union or non-union labor—and the terms of those agreements— fall squarely within that protected space. This limitation applies not only to explicit mandates, but also to subtler forms of influence, including pressure tied to discretionary approvals.
III. The Relevant Inquiry Is What Occurred in Practice
What matters is not just what was written, but what actually occurred.
The administrative record raises legitimate concerns on that front. A councilmember publicly connected their support for the project to the developer’ s engagement with organized labor. Discussions regarding labor agreements took place alongside deliberations over project approval. Additionally, a Memorandum of Understanding with a union was finalized during the same timeframe that the Council was considering its decision.
Taken together, these facts raise a central question: was the project approved based solely on traditional land- use considerations, or did the outcome of private labor negotiations play a role?
Request for Rehearing Rebuttal: March 24, 2026
IV. The Absence of a Written Condition Does Not Resolve the Issue The City relies on the absence of a formal requirement in the Development Agreement. However, the law does not turn on whether a condition is written down.
A decision may be improperly influenced even when the relevant factor is informal, implied, or understood. If a decision-maker signals that their vote is contingent on a labor agreement, and that agreement is then reached prior tofinal approval, it is reasonable to question whether the approval was based solely on permissible considerations.
V. The City’ s Response Leaves Critical Questions Unanswered The City’ s response does not meaningfully address key issues, including:
Whether councilmembers relied on the existence of a labor agreement in casting their votes Whether the project would have been approved absent such an agreement How the timing of the Memorandum of Understanding factored into the decision These are not peripheral concerns—they go directly to whether the process complied with governing law.
VI. Applicable Legal Standard
Under Code of Civil Procedure section 1094.5, a decision constitutes a prejudicial abuse of discretion ifit is based on improper considerations or if the agency fails to proceed in the manner required by law.
If project approval was influenced by labor negotiations that fall within an area preempted by federal law, that standard may be satisfied.
VII. Conclusion
This issue warrants further examination. A rehearing is both appropriate and necessary to ensure that the City’s decision was grounded exclusively in legitimate land-use considerations and free from impermissible influences.
Because the City’ s response does not fully address these concerns, denying rehearing would leave a significant legal issue unresolved. The request should therefore be granted.
Request for Rehearing Rebuttal: March 24, 2026
Issue #6: Denial of a Fair Hearing
I. The City Treats Public Comment as a Substitute for a Formal Hearing The City’ s response suggests that a fair hearing occurred because the public was allowed to speak at later meetings and submit written comments.
But that misses the point. Those are not the same thing as a formal public hearing, and they shouldn’t be treated as interchangeable.
A formal hearing is where evidence is presented, testimony is structured, and the official record is built. It allows for clarification, follow-up, and meaningful engagement with the issues that actually matter to the decision.
General public comment is different. It’s more limited, less structured, and doesn’ t provide the same opportunity to engage with the substance of what’ s being decided.
Relying on general comment as a substitute for reopening the hearing is not adequate.
II. The City Continued Deliberating After Closing the Hearing The public hearing was closed on January 13, 2026. But the decision-making process didn’t stop there.
The City Council continued discussing the project over multiple meetings, considered new developments—including the status of a labor agreement— and ultimately made its final decision on March 3, 2026.
In other words, the process was still active and evolving after the hearing was closed.
When that happens— when new information and ongoing deliberation continue after a hearing ends— basic fairness requires reopening the hearing so the public can respond within the proper framework.
That didn’t happen here.
Instead, the hearing stayed closed, and the public was limited to general comment, even as important developments continued to unfold.
III. Allowing Public Comment Did Not Fix the Problem
The City points to the number of participants— 111 speakers and 522 emails— as evidence that the public had an opportunity to be heard.
But this isn’t about volume. It’s about whether the process itself was fair.
Request for Rehearing Rebuttal: March 24, 2026
The key question is whether the public had a meaningful opportunity to participate at the right time and in the right setting.
General comment doesn’t allow people to respond to new developments in a structured way. It doesn’ t provide an opportunity to formally rebut new information. And it doesn’t ensure that what’ s said is treated as part of the official evidentiary record in the same way as hearing testimony.
So while people were able to speak, their ability to meaningfully influence the outcome was limited.
IV. The Process Was Not Evenly Balanced
There was also a clear imbalance in how the process unfolded.
During the deliberation period, the applicant was able to continue engaging with the City, and developments related to the project—including the labor agreement— continued to take shape.
Meanwhile, the public had no comparable opportunity to respond within the formal hearing process.
That creates a situation where one side can continue shaping the outcome, while the other is restricted to a less effective channel. That kind of imbalance raises serious concerns about fairness.
V. The Timing of the Decision Shows Prejudice
The City argues that no prejudice has been shown.
But prejudice exists when a procedural flaw prevents meaningful participation, and the decision is made after that flaw occurs.
That’ s exactly what happened here.
Deliberations continued for weeks after the hearing was closed. Relevant developments occurred during that time. And the final vote took place without ever reopening the hearing.
Under those circumstances, it’s not necessary to prove the outcome would have changed—only that the public was denied a fair chance to influence it.
That standard is clearly met.
VI. The City Did Not Follow Required Procedures
A fair hearing isn’tjust about allowing comments. It requires a proper process.
That includes a structured forum, an opportunity to respond to new developments, and a decision based on a complete and fairly developed record.
Request for Rehearing Rebuttal: March 24, 2026
By closing the hearing too early and refusing to reopen it as the situation evolved, the City failed to follow that process.
This amounts to a prejudicial abuse of discretion under Code of Civil Procedure §1094.5.
VII. Conclusion
The core issue remains unaddressed: the hearing was closed while the decision-making process was still ongoing.
Allowing general public comment did not provide an equivalent or legally sufficient opportunity for participation.
Because the public was denied a meaningful chance to engage at a critical stage, the integrity of the process is in question.
For these reasons, the Request for Rehearing should be granted. ate: 3/23/2026 6:27:56 PM
From:" Grace McGee" gracemmcgee123@gmail. com
To:"
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Natalie Meeks" [email protected], " Carlos A. Leon" [email protected], "Kristen Maahs" KMaahs@anahe im.net Cc:" Ryan Balius" [email protected], "Norma C. Kurtz" [email protected] Subject:[ EXTERNAL] Please do not approve Festival center project Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Hello Council,
Since you KNOW there is a major evacuation bottleneck in Eas t Anaheim Hills , so much so that you ordered a study of the evacuation area ( which has NOT been completed), the ONLY res pons ible vote you can make is to NOT approve the Festival apartment project. This project needs a complete review & , traffic study, and rehearing.
Voting yes means you are KNOWINGLY endangering thous ands of your citizens. Your top res ponsibility is to firs t ‘do no harm’ to your citizens . Vote NO.
Thank you,
Grace McGee
Sent from my iPhone
ou don't often get email from anitayacoub@gmail. com. Learn why this is important Date: 3/23/2026 7:29:54 PM
From:" Anita Yacoub" anitayacoub@gmail. com
To:
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Ashleigh Aitken" [email protected], "Kristen Maahs" [email protected], "Natalie Meeks" [email protected], " Carlos A.
Leon" [email protected], "Ryan Balius" [email protected], "Natalie Rubalcava" [email protected], Jennifer Diaz" [email protected]
Subject:[ EXTERNAL] Request for Reconsideration of Festival Project Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
City of Anaheim
Mayor and Members of the City Council
Mayor Aitken and Members of the City Council,
I respectfully submit this follow-up correspondence for inclusion in the administrative record regarding Development Application No. 2023- 00043 and Final Environmental Impact Report ( FEIR) No. 358.
This letter is intended to:
Reiterate and incorporate all prior objections and concerns submitted in my February 3, March 3, and March 5, 2026 letters Address the lack of substantive response to those communications Introduce new, material information regarding the City’s incomplete wildfire evacuation study Request reconsideration or delay of final actions pending full and consistent safety analysis I. Lack of Response and Incomplete Administrative Record To date, I have not received a response to any of my letters addressing the detailed public health, wildfire evacuation, emergency response, and Safety Element concerns raised in prior correspondence.
Given the technical, legal, and life- safety nature of these issues, the absence of formal responses raises concern as to whether:
These issues have been fully evaluated
The administrative record adequately reflects them
Required findings are supported by substantial evidence II. Professional and Public Health Perspective
As a Registered Nurse (RN) and Public Health Nurse (PHN) with emergency department and critical care experience, my concerns are grounded in:
Emergency response operations
Hospital surge capacity
Disaster preparedness
Population- level risk assessment
Wildfire evacuation is not theoretical— it is a predictable, recurring public health emergency in Anaheim Hills.
III. Historical Wildfire Evidence and Known System Failures Anaheim Hills has experienced multiple significant wildfire events:
1982 Gypsum Canyon Fire
1993 Eastern Anaheim Hills Fire
2008 Freeway Complex Fire
2017 Canyon Fire 2
These events revealed consistent and documented vulnerabilities:
Limited evacuation routes
Congestion along Santa Ana Canyon Road
Evacuation bottlenecks
Delayed emergency response access
Simultaneous ingress/ egress conflicts
These are recurring structural conditions— not hypothetical scenarios.
IV. Fundamental Change in Risk Profile – Residential vs. Commercial Use The project replaces intermittent commercial use with 447 residential units, introducing:
Apermanent 24-hour population
Sleeping residents during nighttime emergencies
Children, elderly, and medically fragile individuals
Mobility-limited residents requiring assistance
Oxygen-dependent and chronic illness populations
Unlike a theater, residential use creates:
Continuous evacuation demand
Increased EMS utilization
Greater reliance on emergency systems
This is a material and irreversible change in risk conditions.
V. Emergency Medical and Healthcare System Impacts
From a clinical operations perspective:
During wildfire events:
EMS response times increase
Ambulance access is delayed
Hospitals experience surge conditions
Emergency departments may go on diversion
Shelters must support medically vulnerable populations
Wildfire smoke exposure leads to:
Asthma exacerbations
COPD decompensation
Increased cardiac events
Pediatric respiratory distress
Anxiety and panic- related emergencies
These are evidence- based public health impacts that scale with population density.
VI. Evacuation Modeling Limitations
The FEIR acknowledges:
Increased evacuation times
Significant unavoidable impacts
Reliance on a Statement of Overriding Considerations
However, evacuation models often fail to reflect real-world conditions:
Panic behavior
Disabled vehicles blocking lanes
Smoke- reduced visibility
Power outages
Nighttime evacuations
Simultaneous multi-neighborhood evacuation
Evacuation failure is nonlinear— once capacity is exceeded, congestion escalates rapidly.
VII. NEW MATERIAL ISSUE – Missing Wildfire Evacuation Study A critical issue now requires immediate attention:
The City’s Own Wildfire Evacuation Study Has Not Been Completed Approved: March 2025
Cost: $180,000
Expected completion: ~ 9 months
Status ( March 2026): Not delivered
Yet:
The Festival Project was approved without it
The project directly depends on evacuation safety analysis The study was intended to answer the very risks under consideration VIII. Inconsistency in Decision- Making
The administrative record indicates:
Evacuation conditions require further study
Yet the approval implies:
Sufficient information already exists
These positions are internally inconsistent and materially significant.
IX. Potential Conflict of Interest
The City’s evacuation study contractor: Dudek
The developer’ s evacuation consultant: Dudek
This raises legitimate concerns:
Independence of analysis
Objectivity of conclusions
Public confidence in findings
Even the appearance of conflict is problematic in a life-safety context.
X. Timing and Integrity of the Study
Approving the project prior to study completion:
Alters baseline conditions
Risks invalidating study conclusions
Undermines the purpose of the study
This creates a circular and compromised analytical framework.
XI. General Plan Safety Element and Legal Consistency
Under California law:
Gov. Code §65302(g): Safety Element must address wildfire and evacuation Gov. Code §65300.5: Internal consistency required
Key Safety Element principles:
Minimize wildfire exposure
Ensure evacuation capacity
Maintain emergency access
Avoid intensification without infrastructure support
Parcel-level compliance system-level safety
The City must demonstrate how this project remains consistent with these policies.
XII. CEQA and Statement of Overriding Considerations
Under CEQA:
Significant impacts require substantial evidence
Overriding considerations must be supported
Here, the City overrides:
Increased evacuation times
Significant unavoidable impacts
Without the City’s own evacuation study, the evidentiary basis is incomplete.
XIII. Cumulative Risk and Infrastructure Timing
Infrastructure improvements extend to future years ( e.g., 2029) Risk begins immediately upon occupancy
Cumulative development:
Incrementally increases evacuation demand
Pushes system toward threshold failure
Anaheim Hills may be approaching that threshold.
XIV. Legal, Fiscal, and Ethical Implications
Potential consequences include:
CEQA litigation
Challenges under Housing Accountability Act
Taxpayer- funded legal defense
Long-term infrastructure strain
If evacuation failure results in harm:
Consequences extend beyond legal compliance
Ethical responsibility becomes paramount
XV. Request for Council Action
In light of all prior and newly presented information, I respectfully request that the City Council:
1. Delay Final Approval Actions
Until the Wildfire Evacuation Study is completed and released
2. Integrate Study Findings
Into any final decision- making
3. Provide Formal Written Response
Addressing:
Evacuation capacity
Safety Element consistency
Role of incomplete study
4. Evaluate Rehearing / Reconsideration
Based on:
New material information
Incomplete record
Potential inconsistencies
XVI. Closing
This is not opposition to housing.
It is a request that decisions involving life safety be made with complete, consistent, and transparent analysis.
Approving high-density residential development in a wildfire-prone hillside community without the City’s own evacuation study is not consistent with:
Public health principles
Emergency preparedness standards
Sound planning practice
I respectfully urge the Council to take a measured, evidence- based approach before proceeding further.
Thank you for your consideration,
Anita Yacoub, DVM
Anaheim Hills resident
ou don't often get email from spencerpuskas@gmail. com. Learn why this is important Date: 3/23/2026 8:54:14 PM
From:" S Puskas" spencerpuskas@gmail. com
To:" City Clerk" [email protected]
Subject:[ EXTERNAL] Request for Rehearing Rebuttal March 24.2026 Attachment: Request for Rehearing Rebuttal March 24.2026.pdf; Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
cityclerk@anahei
Request for Rehearing Rebuttal: March 24, 2026
Formal Rebuttal
Request for Rehearing
Meeting on March 24, 2026
Anaheim Hills Festival Project
DEV2023-00043
Prepared Submission
Request for Rehearing Rebuttal: March 24, 2026
Issue #1: Failure to Consider Material
Wildfire Evacuation Information
I. The City’s Response Frames the Issue Too Narrowly
The City argues that the Environmental Impact Report (EIR) properly evaluated wildfire evacuation conditions based on the information available at the time of the Notice of Preparation (NOP), and that it was not obligated to delay approval until completion of the Citywide Wildfire Evacuation Plan.
That framing misses the point.
While CEQA analysis is typically based on information available during environmental review, that does not allow the City to ignore relevant information that is actively being developed—especially when it directly relates to the impacts at issue. The question here isn’t whether the City had to wait indefinitely, but whether it moved forward despite knowing that critical evacuation data was in progress and unfinished.
II. The City Itself Recognized Gaps in Existing Evacuation Analysis The City chose to initiate a comprehensive wildfire evacuation study, secured funding for it, and began work before approving the Project. That decision matters.
It shows the City understood that current information about evacuation conditions—particularly in Anaheim Hills— was not complete. Otherwise, there would be no need for the study.
This creates a clear inconsistency: the City acknowledged the need for deeper analysis, yet approved a project that will directly affect evacuation conditions before that analysis was finished or reviewed.
III. The Project Directly Affects What the Study Is Evaluating The Festival Project increases residential density, adds traffic, and relies on the same evacuation routes currently under study.
These are not tangential issues— they go to the heart of what the Wildfire Evacuation Plan is supposed to evaluate: whether residents can safely evacuate during a wildfire.
Approving a project that changes those conditions while the City is still trying to understand them raises a basic concern: the decision may have been made without a full picture of the risks.
IV. A Project-Level Study Is Not a Substitute for System-Wide Analysis The City points to a project-specific evacuation analysis and notes that it was peer-reviewed.
Request for Rehearing Rebuttal: March 24, 2026
That may be true, but it doesn’t resolve the issue.
Project-level studies operate within a defined scope and set of assumptions. They are not designed to evaluate broader, system-wide evacuation capacity. The City’s own wildfire plan, on the other hand, is intended to do exactly that—using more comprehensive data and a wider lens.
Moving forward without that broader analysis risks relying on a narrower and potentially incomplete understanding of evacuation conditions.
V. CEQA Requires Agencies to Use the Best Information Reasonably Available CEQA does not require agencies to wait forever for future studies. But it also does not allow them to disregard material information that is actively being developed and directly relevant.
Here, the City knew:
A comprehensive evacuation study was underway
The study addressed the same conditions affected by the Project The results had not yet been completed or reviewed
Under those circumstances, itis fair to question whether the City relied on the most complete and reliable information available before approving the Project.
VI. Calling the Ongoing Study “ Speculative” Doesn’ t Hold Up The City characterizes the evacuation plan as speculative because it is not finalized.
But this is not a hypothetical study—itis funded, underway, and specifically designed to address evacuation risks in areas like Anaheim Hills. Its completion is expected, not uncertain.
Dismissing it as speculative minimizes its significance. In reality, it is a concrete effort to answer the exact questions raised by this Project.
VII. Proceeding Without This Information Raises Serious Concerns A prejudicial abuse of discretion can occur when an agency fails to follow required procedures or makes a decision unsupported by substantial evidence.
By approving the Project while acknowledging that key evacuation analysis was still incomplete—and without incorporating those forthcoming findings—the City risks having made a decision without fully informing itself.
That undermines confidence in the environmental review process and warrants reconsideration.
Request for Rehearing Rebuttal: March 24, 2026
VIII. Conclusion
At its core, this issue is about timing and information.
The City moved forward with approval while simultaneously working to better understand the very evacuation conditions affected by the Project. That disconnect raises legitimate concerns about whether the decision was based on a complete and accurate understanding of wildfire risk.
For that reason, a rehearing is appropriate to ensure the Project is evaluated using the most complete and reliable information available.
Request for Rehearing Rebuttal: March 24, 2026
Issue #2: Consideration of Labor
Negotiations in Project Approval
I. The City Frames the Issue Too Narrowly
The City’ s response focuses on the claim that union labor was not formally required as part of the Development Agreement. That framing does not address the actual concern raised in the request for rehearing.
The issue is not whether a written condition appears in the agreement. The question is whether approval of the project was, in practice, influenced—directly or indirectly—by the status or outcome of private labor negotiations. A public agency cannot avoid scrutiny simply because a condition was not reduced to writing ifthe record suggests it played a role in the decision-making process.
II. Federal Law Prohibits Government Interference in Labor Decisions Federal labor law draws a clear line. Under doctrines such as Machinists preemption, local governments are prohibited from inserting themselves into areas that Congress intended to leave to the free play of economic forces.
Decisions about whether to use union or non-union labor—and the terms of those agreements— fall squarely within that protected space. This limitation applies not only to explicit mandates, but also to subtler forms of influence, including pressure tied to discretionary approvals.
III. The Relevant Inquiry Is What Occurred in Practice
What matters is not just what was written, but what actually occurred.
The administrative record raises legitimate concerns on that front. A councilmember publicly connected their support for the project to the developer’ s engagement with organized labor. Discussions regarding labor agreements took place alongside deliberations over project approval. Additionally, a Memorandum of Understanding with a union was finalized during the same timeframe that the Council was considering its decision.
Taken together, these facts raise a central question: was the project approved based solely on traditional land- use considerations, or did the outcome of private labor negotiations play a role?
Request for Rehearing Rebuttal: March 24, 2026
IV. The Absence of a Written Condition Does Not Resolve the Issue The City relies on the absence of a formal requirement in the Development Agreement. However, the law does not turn on whether a condition is written down.
A decision may be improperly influenced even when the relevant factor is informal, implied, or understood. If a decision-maker signals that their vote is contingent on a labor agreement, and that agreement is then reached prior tofinal approval, it is reasonable to question whether the approval was based solely on permissible considerations.
V. The City’ s Response Leaves Critical Questions Unanswered The City’ s response does not meaningfully address key issues, including:
Whether councilmembers relied on the existence of a labor agreement in casting their votes Whether the project would have been approved absent such an agreement How the timing of the Memorandum of Understanding factored into the decision These are not peripheral concerns—they go directly to whether the process complied with governing law.
VI. Applicable Legal Standard
Under Code of Civil Procedure section 1094.5, a decision constitutes a prejudicial abuse of discretion ifit is based on improper considerations or if the agency fails to proceed in the manner required by law.
If project approval was influenced by labor negotiations that fall within an area preempted by federal law, that standard may be satisfied.
VII. Conclusion
This issue warrants further examination. A rehearing is both appropriate and necessary to ensure that the City’s decision was grounded exclusively in legitimate land-use considerations and free from impermissible influences.
Because the City’ s response does not fully address these concerns, denying rehearing would leave a significant legal issue unresolved. The request should therefore be granted.
Request for Rehearing Rebuttal: March 24, 2026
Issue #6: Denial of a Fair Hearing
I. The City Treats Public Comment as a Substitute for a Formal Hearing The City’ s response suggests that a fair hearing occurred because the public was allowed to speak at later meetings and submit written comments.
But that misses the point. Those are not the same thing as a formal public hearing, and they shouldn’t be treated as interchangeable.
A formal hearing is where evidence is presented, testimony is structured, and the official record is built. It allows for clarification, follow-up, and meaningful engagement with the issues that actually matter to the decision.
General public comment is different. It’s more limited, less structured, and doesn’ t provide the same opportunity to engage with the substance of what’ s being decided.
Relying on general comment as a substitute for reopening the hearing is not adequate.
II. The City Continued Deliberating After Closing the Hearing The public hearing was closed on January 13, 2026. But the decision-making process didn’t stop there.
The City Council continued discussing the project over multiple meetings, considered new developments—including the status of a labor agreement— and ultimately made its final decision on March 3, 2026.
In other words, the process was still active and evolving after the hearing was closed.
When that happens— when new information and ongoing deliberation continue after a hearing ends— basic fairness requires reopening the hearing so the public can respond within the proper framework.
That didn’t happen here.
Instead, the hearing stayed closed, and the public was limited to general comment, even as important developments continued to unfold.
III. Allowing Public Comment Did Not Fix the Problem
The City points to the number of participants— 111 speakers and 522 emails— as evidence that the public had an opportunity to be heard.
But this isn’t about volume. It’s about whether the process itself was fair.
Request for Rehearing Rebuttal: March 24, 2026
The key question is whether the public had a meaningful opportunity to participate at the right time and in the right setting.
General comment doesn’t allow people to respond to new developments in a structured way. It doesn’ t provide an opportunity to formally rebut new information. And it doesn’t ensure that what’ s said is treated as part of the official evidentiary record in the same way as hearing testimony.
So while people were able to speak, their ability to meaningfully influence the outcome was limited.
IV. The Process Was Not Evenly Balanced
There was also a clear imbalance in how the process unfolded.
During the deliberation period, the applicant was able to continue engaging with the City, and developments related to the project—including the labor agreement— continued to take shape.
Meanwhile, the public had no comparable opportunity to respond within the formal hearing process.
That creates a situation where one side can continue shaping the outcome, while the other is restricted to a less effective channel. That kind of imbalance raises serious concerns about fairness.
V. The Timing of the Decision Shows Prejudice
The City argues that no prejudice has been shown.
But prejudice exists when a procedural flaw prevents meaningful participation, and the decision is made after that flaw occurs.
That’ s exactly what happened here.
Deliberations continued for weeks after the hearing was closed. Relevant developments occurred during that time. And the final vote took place without ever reopening the hearing.
Under those circumstances, it’s not necessary to prove the outcome would have changed—only that the public was denied a fair chance to influence it.
That standard is clearly met.
VI. The City Did Not Follow Required Procedures
A fair hearing isn’tjust about allowing comments. It requires a proper process.
That includes a structured forum, an opportunity to respond to new developments, and a decision based on a complete and fairly developed record.
Request for Rehearing Rebuttal: March 24, 2026
By closing the hearing too early and refusing to reopen it as the situation evolved, the City failed to follow that process.
This amounts to a prejudicial abuse of discretion under Code of Civil Procedure §1094.5.
VII. Conclusion
The core issue remains unaddressed: the hearing was closed while the decision-making process was still ongoing.
Allowing general public comment did not provide an equivalent or legally sufficient opportunity for participation.
Because the public was denied a meaningful chance to engage at a critical stage, the integrity of the process is in question.
For these reasons, the Request for Rehearing should be granted. ate: 3/22/2026 10:45:12 PM
From:" Brenda Robbins" brenda-robbins@sbcglobal. net
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Anaheim Hills Festival Project 2026 Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
March 22, 2026
ATTN: Public Comment
I have reviewed the City of Anaheim’ s City Council Agenda for March 24, 2026.
In your Agenda I see you plan on is suing a Denial of the Reques t for Rehearing on the Approval of the Fes tival Project. In it I als o note a Reques t for Rehearing that was submitted to the City on March 10, 2026. Why would the City have listed this as an automatic “ DENIAL” on the Agenda without having a public dis cus sion? What about the 800- page Appeal?
This project was not fully evaluated and should not have been approved in the first place without a full CEQA being finalized. This project, if built, will continue to severely under evaluate the es timates you believe are adequate for fire evacuation. The City has a duty to their citizen’ s and the State of California to uphold and follow the law and purs ue that cours e before approving ANY project.
The City should not be approving and signing a project contract with any Developer BEFORE they have even met with their citizen’ s that is set for public dis cus sion prior to a vote. The Labor Union contract was dis cus sed and signed IN PRIVATE prior to the 3-3-2026 Project vote! You mis lead the citizens of the City of Anaheim on 3-3-2026 into thinking their repres entatives were going to provide them with a fair and hones t evaluation prior to your voting on this project’ s feas ibility.
I do not have a problemwith residential building in AnaheimHills . BUT IDOFEELTHECITIZENS OFANAHEIM HILLS DESERVERESPONSIBLEBUILDS. We do not have the infrastructure to handle 1000 cars ! AnaheimHills was built as a “ MasterPlanned Community”. When the next fire comes , some of us only have one, maybe 2 ways out, to get out! ONEOF MYFAMILY’S ONLYWAYOUT IS DIRECTLYTOWARDSTHEFIRE’S PREDICTED ROUTEWITH A 1000 MORE PEOPLE!!!
You are putting a 4story, 447-unit multi-family apartment complexsite onto a dot-size” piece of land that currently sits on commercial land. There is no residentialapartments or homes in this neighborhood comparable in size. The City needs to open their eyes and lookat the surroundings and NOT JUST THEPIECEOF LAND!!! This effects EVERYONEis the area. We cannot breathe with the traffic as is .
It is not just outside traffic but will soon develop DOUBLETHEINSIDETRAFFIC! There are other places within east Anaheimthat are more appropriate that can accommodate this large type of structure. What about the vacant lots around La Palma Avenue and ImperialHighway? There is a long strip of land running fromImperial Highway to Lakeview Avenue. What about both sides of the long-gone/torn down old Kaiser building (and the connecting abandoned parking lot directly across the street) on Lakeview Avenue?????? This is not right for our neighborhood! You will suffocate us if this gets built.
First, Irequest you grant ourrequest to reopen this Agenda itemforthe residents of the Hills to discuss our concerns regarding this project based on our Request for Rehearing. Answer those concerns .
Second, I urge you to re-consider your previous approval ofthis build site and NOT APPROVEBUILDINGon this site as presented by Shea Properties in building this monstrosity.
Brenda Robbins
8141 East Kennedy Road
Anaheim, Ca 92808
40+ yearresident
ou don't often get email from joe.branche@yahoo. com. Learn why this is important Date: 3/23/2026 8:49:13 AM
From:" [email protected]" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL]
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Mayor and Members of the City Council,
I am writing in advance of the March 24 consideration of the rehearing for the Festival project in Anaheim Hills to reiterate and clarify my concerns regarding traffic and evacuation impacts.
My concern is straightforward. I do not believe the traffic impact and evacuation analysis being relied upon adequately reflects current, real-world conditions in our area.
The theater on the Festival site has not been in regular use for some time. Even when operational, it primarily drew patrons from within the surrounding community and did not represent a sustained, permanent increase in daily vehicle volume. In contrast, the current proposal introduces an ongoing and concentrated traffic load into a corridor that is already experiencing routine gridlock.
We have lived in this area for approximately five years, and traffic conditions have deteriorated substantially even within that short period. Congestion is no longer occasional. It is daily. Any evaluation that assumes off-peak movement or theoretical flow rates does not align with lived experience on these roads.
More importantly, emergency planning cannot assume convenient timing. A wildfire will not occur at an ideal hour. If evacuation coincides with rush hour congestion, the consequences would be severe. While I appreciate the City’s efforts to improve preparedness since 2017, the proposed “ Know Your Way” concept remains unproven under worst- case conditions. Neighbors who experienced the Canyon Fire have shared deeply concerning accounts of evacuation bottlenecks that exposed serious vulnerabilities.
Before approving additional density in a high fire-risk area with known congestion constraints, I respectfully urge the Council to require a deeper, stresstested analysis that evaluates evacuation capacity during peak traffic conditions rather than modeled averages.
I would also respectfully ask for clarity regarding precedent. The SALT development proposal at Deer Canyon was rejected based in part on concerns about traffic impact and strain on infrastructure in this same general area. From a resident’ s perspective, the Festival proposal presents similar issues.
To date, no one has clearly articulated how this project materially differs in a way that substantially changes the risk profile. If the Council’ s assessment has shifted, I believe residents deserve a clear explanation of why.
Finally, I ask that you weigh the input of the residents you were elected to represent. Many of us in District 6 have raised consistent concerns about traffic congestion and evacuation safety. These concerns reflect daily lived experience and legitimate public safety considerations. As our District 6 representative and as Mayor, your leadership carries particular importance in ensuring those concerns are fully heard and meaningfully addressed before irreversible decisions are made.
This is not about opposing development categorically. It is about ensuring that public safety, particularly evacuation feasibility under worst- case conditions, is evaluated with the highest level of rigor. With wildfire risk increasing year after year, this is an area where assumptions carry real consequences.
Thank you for your time and consideration.
Joe Branche
ou don't often get email from concernedanaheimresidents@gmail. com. Learn why this is important Date: 3/23/2026 10:15:53 PM
From:" Concerned AnaheimResidents" concernedanaheimresidents@gmail. com To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Fwd: Request for Clarification onAppeal Issues – Festival Project (DEV2023-00043) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Forwarded message ---------
From: Concerned AnaheimResidents < concernedanaheimresidents@gmail. com> Date: Mon, Mar 23, 2026 at 3:57 PM
Subject: Request for Clarification on Appeal Issues – Festival Project (DEV2023- 00043) To: <aaitken@anaheim. net>, < cleon@anaheim. net>, < rbalius@anaheim. net>, < nrubalcava@anaheim. net>, < nkurtz@anaheim. net>, kmaahs@anaheim. net>, < nmeeks@anaheim. net>, < publiccomment@anaheim. net> Cc: <cityclerk@anaheim. net>
Dear Mayor and Council Members,
Ahead of the March 24 meeting, I am writing to request clarification on several significant issues raised in the Request for Rehearing and supporting materials.
These questions reflect concerns already raised on the record by residents and outlined in detail in the appeal. Given their direct impact on public safety and procedural integrity, it is important that they are clearly addressed prior to any final decision.
1. Wildfire Evacuation & CEQA
How did the City determine that it had sufficient information to approve the project while a comprehensive wildfire evacuation study— addressing the same conditions— was still underway?
What analysis demonstrates that a project- level evacuation review adequately accounts for system-wide evacuation capacity? How were real-world conditions, including existing bottlenecks and congestion, incorporated into the evaluation of evacuation feasibility?
2. Consideration of Labor Negotiations
Can the Council clarify whether the existence or timing of any labor agreements was considered— formally or informally— in the decision to approve the project?
Would the project have been approved under the same conditions ifno such agreement had been reached? How does the City ensure that discretionary land- use decisions remain based solely on appropriate planning considerations?
3. Fair Hearing & Due Process
Why was the formal public hearing not reopened after January 13, despite continued deliberations and the introduction of new developments?
How does the City distinguish general public comment from formal hearing testimony in terms of its role in the administrative record? What opportunity did the public have to formally respond to developments that occurred after the hearing was closed?
4. Completeness of the Record & Public Access
Where can the public find complete and up-to-date documentation reflecting the full deliberation process, including developments that occurred after the hearing was closed?
How does the City ensure that the administrative record reflects all relevant information considered in its decision-making? When key public records and meeting documentation are delayed or incomplete, how is the public expected to meaningfully engage with and understand the process?
5. Alignment Between the Appeal and the City’s Response The Request for Rehearing provided detailed, issue- specific analysis, including factual context around evacuation conditions, roadway constraints, and known bottlenecks affecting real-world traffic flow. ncontrast, the City’s response appears to address several of these issues at a more generalized level.
The appeal raised concerns about how real-world evacuation conditions— such as existing bottlenecks, roadway limitations, and congestion patterns— affect evacuation feasibility, while the City’s response appears to rely on broader conclusions without clearly demonstrating how those specific conditions were evaluated.
The appeal identified ongoing developments and evolving conditions, including active studies and post- hearing changes, while the City’s response does not clearly indicate how those factors were incorporated into the final decision.
The appeal raised process- level concerns about timing, participation, and the completeness of the record, while the City’s response appears to focus on procedural sufficiency without directly addressing whether the process allowed for meaningful engagement with new information.
These distinctions are important, as they go to whether the substance and level of detail in the appeal were fully considered.
Can the Council identify where in the administrative record the specific, detailed concerns raised in the appeal are directly addressed, rather than summarized at a broader level?
How did the City determine that its response fully engaged with the depth and specificity of the issues raised— particularly those involving real-world conditions and infrastructure constraints?
Given the level of detail provided inthe Request for Rehearing, can the Council explain howthe materials were reviewed, what criteria were used to determine that the issues raised did not warrant further consideration, and where inthe record the public can see howthat review was conducted and howspecific concerns were evaluated? Given the level of detail provided inthe appeal, ensuring that each issue is directly and specifically addressed would help clarify how the City determined that no further review was warranted.
Supporting Images – Real-World Conditions
Attached images reflect observed, real-world conditions in and around the project site, including:
Parking demand at or near capacity during typical peak hours Congestion along primary access and evacuation routes
Bottlenecks and constrained traffic flow at key intersections These conditions are directly relevant to the evaluation of evacuation feasibility, infrastructure capacity, and traffic impacts discussed above.
Image 1 – Wide Parking Conditions
Wide view of parking demand at the project site during typical peak conditions, illustrating sustained high utilization across the lot.
Image 2 – Parking at Capacity
Festival shopping center parking conditions during peak evening hours ( approx. 7:20 PM), showing near full capacity. mage 3 – Traffic Congestion
Observed congestion along primary access and evacuation routes (Weir Canyon Rd heading toward 91fwy), showing limited vehicle throughput during peak hours.
Image 4 – Intersection Constraint
Intersection congestion despite active signal (On Weir Canyon & Monte Vista Rd), illustrating constrained traffic flow and delayed clearing.
Closing
Many of these questions still lack clear, documented answers.
If these issues have already been addressed, I would appreciate being directed to where in the record those responses can be found.
Addressing these questions prior to any final vote would help ensure that the Council’ s decision reflects a complete, transparent, and fully informed understanding of both the impacts and the concerns raised by the community.
Thank you for your time and consideration.
Sincerely ,
Shelly Robbins
Anaheim, CA 92808
ou don't often get email from imvega600@gmail. com. Learn why this is important Date: 3/24/2026 10:42:04 AM
From:" martha" imvega600@gmail. com
To:"
Anaheim GovOutReach" [email protected], "Ashleigh Aitken" [email protected], " Public Comment" [email protected]
Subject:[ EXTERNAL] Vote NO- Anaheim Hills Festival Center Project (DA2023-00043 / FEIR No. 358) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Request for Reconsideration – Unresolved Public Safety.
I am a concerned Anaheim Hill residence living in the area off Weir Canyon since it was developed in 1984 and have seen the impact.
Given the technical, legal, and life- safety nature of these issues, this requires more evaluation and consideration of the risk to current and future residents.
Historical Wildfire Evidence and Known System Failures.
Anaheim Hills has experienced multiple significant wildfire events:
1982 Gypsum Canyon Fire
1993 Eastern Anaheim Hills Fire
2008 Freeway Complex Fire
2017 Canyon Fire 2
These events revealed consistent and documented vulnerabilities:
Limited evacuation routes
Congestion along Santa Ana Canyon Road
Evacuation bottlenecks
Delayed emergency response access
Simultaneous ingress/ egress conflicts
The project replaces intermittent commercial use with 447 residential units, introducing:
permanent 24-hour population
Sleeping residents during nighttime emergency
Unlike a theater, residential use creates:
Continuous evacuation demand
Increased EMS utilization
Greater reliance on emergency systems
Evacuation conditions require further study!!
I respectfully urge the Council to take a measured, evidence- based approach before proceeding further. Please STOP this development until The current residents are assured with evidence of safe evacuation plans!!!!! God Bless,
Martha Vega
Anaheim Hills Resident
oudon't often get email from tannissoto@sbcglobal. net. Learn why this is important Date: 3/24/2026 3:29:38 PM
From:" Tannis Soto" [email protected]
To:
Public Comment" [email protected], "AshleighAitken" [email protected], "Carlos A. Leon" [email protected], "RyanBalius" [email protected], Natalie Rubalcava" NRubalcava@anaheim. net, " Norma C. Kurtz" NKurtz@anaheim. net, " Kristen Maahs" KMaahs@anaheim. net, " Natalie Meeks" NMeeks@anaheim. net
Subject:[ EXTERNAL] Rehearing request regarding Festival Development Proposal Warning: This email originated from outside the City of Anaheim. Do not click links or open attachments unless you recognize the sender and are expecting the message.
Dear Mayor Ashleigh Aitken and City Council Members,
I write to make a plea that you all reconsider the decision that was made on March 3, 2026 approving the project at Anaheim Hills Festival Center and decide as a whole that the proposed Festival Center project development should not be allowed to be built due to public safety and evacuation concerns.
In light of what occurred in the catastrophic and devastating Pacific Palisades fire I believe the only thing that prevented a similar fire occurring inAnaheim Hills is that there was not a shift in the winds. Plain and simple...... we were lucky last time. With the gridlock that happened the last time we had a fire in Anaheim Hills if you add hundreds of more people and their cars to a similar situation the time frame for evacuating puts at risk lives significantly more especially ifwe were to experience winds similar to what happened in the Palisades. This area already has experienced fires which proved there is limited ingress and egress making evacuation a known problem. At the March 3, 2026 City Council Meeting the Fire Chief made it clear that in order to prevent sparks from a fire traveling via wind and an event similar to the Pacific Palisades fire and other catastrophic fires experienced in California in recent years happening here inAnaheim Hills that additional preventable measures needed to be taken in Anaheim Hills. He said it would initially cost 1 to 2 million dollars to implement needed weed removal and in order to keep that up yearly it would be a yearly expense of 1 million dollars per year. This is something he said was needed for preventative measures.
This is not something that is already going on. That alone is reason enough to not allow the development.
I propose that for any future proposed developments that the developer/ builder be required to contribute a significant amount of capital towards needed safeguards.
While I appreciate that the Planning Department Representative indicated that they have met with Cal Trans and the County and have come up with ways to mitigate and prevent gridlock in the event of a needed evacuation I just don't see where that is going to work given the current gridlock Anaheim Hills experiences on a daily basis during the work week and on most Saturdays. Allowing a major new development without a proven, effective evacuation plan places us residents at increased risk. The safety of the residents ofAnaheim Hills must be paramount to allowing a new apartment development to be built.
I ask that all of you all deny the approval of the Festival Center's proposed building of apartments at this time.
I ask that the owners of the property look beyond and consider building other services for the community on that property. We don't need more housing up here. We could use more restaurants and services. We no longer have a theatre in Anaheim Hills since the Festival Theatre and Cinema City theatres closed. We miss the theatres.
Thank you for your service to our community.
Peace,
Tannis Dunbar- Soto
138 S. Leandro Street
Anaheim, California 92807
ou don't often get email from shrag3@gmail. com. Learn why this is important Date: 3/4/2026 3:43:55 AM
From:" nanci shrager" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Logic and Safety: Why the Festival Center Project is a Mistake Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Council Member,
I am writing to ask you to vote "No" on the Anaheim Hills Festival Center apartment project. You don't need to be a traffic expert to see that Santa Ana Canyon Road is already at its limit. Most days, just getting to the store or work is a challenge. The idea that we can add over 400 apartments and about 1300 people to this area without creating a disaster during a wildfire evacuation just doesn't pass the "common sense" test.
The city's own reports admit that it already takes residents over three hours to get out during a fire. To then say that adding another 7 minutes of delay is "not a big deal" is incredibly frustrating to those of us who live here. Ifa bucket is already overflowing, you don't keep pouring more water into it and say it's fine. By approving this, the city is basically admitting the evacuation plan is broken but choosing to make it even more crowded anyway.
We need our leaders to look at the reality of our streets, not just the numbers on a developer' s spreadsheet. Please do the responsible thing and protect the residents who are already here. We need better ways to get out of the Hills, not more people trapped in them. Please vote "No" on this project.
Sincerely,
Nanci Shrager
ou don't often get email from contactthekims@gmail. com. Learn why this is important Date: 3/4/2026 7:12:09 AM
From:" g kim" contactthekims@gmail. com
To:
[email protected]" [email protected], "[email protected]" caleon@anahe im.net, "Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" NMeeks@anahe im.net, " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected] Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[ EXTERNAL] URGENT: Legal & Safety Opposition to Second Reading of Festival Anaheim Hills Project (EIR No. 358) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
To the Honorable Mayor and Council Members,
I am writing to formally oppose the final adoption of the 447-unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Council to reverse its decision based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay According to EIR Appendix C (Responses to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind-driven wildfire in a Very High Fire Hazard Severity Zone VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 2020) and Gov. Code § 65302(g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analysis (Section 4.17) is fundamentally flawed because it ignores intercity bypass volume. Fairmont Blvd and Weir Canyon serve as primary " shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Des tabilization of the Home Insurance Market With premiums in 92807/92808 already surging by 20–30% this year, adding highdensity units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a "tipping point" for mass insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
CEQA Inconsistency and Lack of Overriding Considerations The "Statement of Overriding Considerations" is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the Platinum Triangle.
Developer convenience is being prioritized over the physical and financial survival of your constituents.
Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th.
Sincerely,
Glen Kim
8177 E Somerset Ln
Anaheim, CA 92808
ou don't often get email from contactthekims@gmail. com. Learn why this is important Date: 3/4/2026 7:48:41 AM
From:" g kim" contactthekims@gmail. com
To:
[email protected]" [email protected], "Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected], "Ryan Balius" RBalius@anahe im.net, "Natalie Rubalcava" [email protected], "Ashleigh Aitken" AAitken@anahe im.net Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[
EXTERNAL] Re: URGENT: Legal & Safety Opposition to Second Reading of Festival AnaheimHills Project (EIR No. 358)
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Resending with the mayor’ s correct email.
Thank you,
Glen
On Mar 4, 2026, at 7:12 AM, g kim <contactthekims@gmail. com> wrote:
To the Honorable Mayor and Council Members,
I am writing to formally oppose the final adoption of the 447-unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Council to reverse its decision based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay According to EIR Appendix C (Responses to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind-driven wildfire in a Very High Fire Hazard Severity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Gov. Code § 65302(g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analysis (Section 4.17) is fundamentally flawed because it ignores inter-city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. dding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Destabilization of the Home Insurance Market With premiums in 92807/92808 already surging by 20–30% this year, adding high-density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a "tipping point" for mas s insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Incons istency and Lack of Overriding Cons iderations The "Statement of Overriding Considerations" is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the Platinum Triangle. Developer convenience is being prioritized over the physical and financial survival of your constituents.
Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th.
Sincerely,
Glen Kim
8177 E Somerset Ln
Anaheim, CA 92808
ou don't often get email from vishal.doctor@gmail. com. Learn why this is important Date: 3/4/2026 7:40:44 AM
From:" Vishal Chheda" [email protected]
To:
[email protected]" [email protected], "[email protected]" caleon@anahe im.net, "Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" NMeeks@anahe im.net, " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected] Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[ EXTERNAL] URGENT: Legal & Safety Opposition to Second Reading of Festival Anaheim Hills Project (EIR No. 358) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
To the Honorable Mayor and Council Members,
I am writing to formally oppose the final adoption of the 447- unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Council to reverse its decision based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay (not 14) According to EIR Appendix C (Responses to Written Comments), the City admits this project results in a "potential extension of time to evacuate by approximately 24 minutes." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone (VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Gov. Code § 65302(g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omission of Regional "Shadow Traffic" and Bypass Volume The Traffic Analysis ( Section 4.17) is fundamentally flawed because it ignores inter- city bypass volume. Fairmont Blvd and Weir Canyon serve as primary "shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Destabilization of the Home Insurance Market The Council has failed to study the project’ s impact on our crumbling insurance market. With premiums in 92807/92808 already surging by 20– 30% this year, adding high-density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a tipping point" for mass insurance non-renewals, potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack of Overriding Considerations The "Statement of Overriding Considerations" is invalid because the City has not exhausted feasible alternatives in safer, transit- rich areas like the Platinum Triangle. You are prioritizing developer convenience over the physical and financial survival of your constituents.
Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th.
Sincerely,
Vishal Chheda
From Anaheim Hills
ou don't often get email from vishal.doctor@gmail. com. Learn why this is important Date: 3/4/2026 7:49:04 AM
From:" Vishal Chheda" [email protected]
To:
Ashleigh Aitken" [email protected], " [email protected]" [email protected], " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" NMeeks@anahe im.net, " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected] Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[
EXTERNAL] Re: URGENT: Legal & Safety Opposition to Second Reading of Festival AnaheimHills Project (EIR No. 358)
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
To the Honorable Mayor and Council Members,
I am writing to formally oppose the final adoption of the 447- unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Council to reverse its decision based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay (not 14) According to EIR Appendix C (Responses to Written Comments), the City admits this project results in a "potential extension of time to evacuate by approximately 24 minutes." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone (VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Gov. Code § 65302(g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omission of Regional "Shadow Traffic" and Bypass Volume The Traffic Analysis ( Section 4.17) is fundamentally flawed because it ignores inter- city bypass volume. Fairmont Blvd and Weir Canyon serve as primary "shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Destabilization of the Home Insurance Market The Council has failed to study the project’ s impact on our crumbling insurance market. With premiums in 92807/92808 already surging by 20– 30% this year, adding high-density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a "tipping point" for mass insurance non-renewals, potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack of Overriding Considerations The "Statement of Overriding Considerations" is invalid because the City has not exhausted feasible alternatives in safer, transit- rich areas like the Platinum Triangle. You are prioritizing developer convenience over the physical and financial survival of your constituents.
Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th.
Sincerely,
Vishal Chheda
From Anaheim Hills
ate: 3/4/2026 8:06:45 AM
From:" Hisham Sabeh" sabehsbills@gmail. com
To:
Ashleigh Aitken" [email protected], " [email protected]" [email protected], " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" NMeeks@anahe im.net, " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected] Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[ EXTERNAL] Legal & Safety Opposition to Second Reading of Festival Anaheim Hills Project (EIR No. 358) You don' t often get email from sabehs bills @gmail. com. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
URGENT: Legal & Safety Oppos ition to Second Reading of Fes tival Anaheim Hills Project ( EIR No. 358) To the Honorable Mayor and Council Members ,
I am writing to formally oppos e the final adoption of the 447- unit project at the Anaheim Hills Fes tival site. The 4-3 vote on March 3rd was bas ed on an incomplete and legally vulnerable record. We urge the Council to revers e its decis ion based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay ( not 14) According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 ( 2020) and Gov. Code § 65302( g)(5), the City is required to ens ure res idential developments in hazard areas have adequate evacuation routes . A $200, 000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analys is (Section 4.17) is fundamentally flawed becaus e it ignores inter- city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary shortcuts " for thous ands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This " shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridorthat is already a regionalrelief valve is a direct violation of the General Plan Safety Element.
3. Economic Destabilization of the Home Insurance Market The Councilhas failed to study the project’s impact on our crumbling insurance market. With premiums in 92807/92808 already surging by 20–30% this year, adding high-density units to a high-riskzone signals to carriers that the "risk density" has exceeded safe limits . This project acts as a " tipping point" for mass insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack ofOverriding Considerations The "Statement ofOverriding Considerations " is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the PlatinumTriangle.
You are prioritizing developer convenience overthe physicaland financial survival of your constituents.
Thank you to the council members who voted NOon 3/3and forthose that voted yes , please considerthe facts above and Vote NO on March 24th.
Sincerely,
F. Sabeh
952 S Endicott Ct AnaheimHills
ate: 3/4/2026 8:36:04 AM
From:" KimCollell" [email protected]
To:
Ashleigh Aitken" [email protected], " [email protected]" [email protected], " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" NMeeks@anahe im.net, " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected] Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[
EXTERNAL] URGENT: Legal and Safety Opposition to Second Reading of Festival AnaheimHills Project. (EIR No. 358)
You don' t often get email from kacollell@att. net. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
To the Honorable Mayor and Council Members ,
I am writing to formally oppos e the final adoption of the 447- unit project at the Anaheim Hills Fes tival site. The 4-3 vote on March 3rd was bas ed on an incomplete and legally vulnerable record. We urge the Council to revers e its decis ion based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay ( not 14) According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 ( 2020) and Gov. Code § 65302( g)(5), the City is required to ens ure res idential developments in hazard areas have adequate evacuation routes . A $200, 000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analys is (Section 4.17) is fundamentally flawed becaus e it ignores inter- city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary shortcuts " for thous ands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This " shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridorthat is already a regionalrelief valve is a direct violation of the General Plan Safety Element.
3. Economic Destabilization of the Home Insurance Market The Councilhas failed to study the project’s impact on our crumbling insurance market. With premiums in 92807/92808 already surging by 20–30% this year, adding high-density units to a high-riskzone signals to carriers that the "risk density" has exceeded safe limits . This project acts as a " tipping point" for mass insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack ofOverriding Considerations The "Statement ofOverriding Considerations " is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the PlatinumTriangle.
You are prioritizing developer convenience overthe physicaland financial survival of your constituents.
Thank you to the council members who voted NOon 3/3and forthose that voted yes , please considerthe facts above and Vote NO on March 24th.
Sincerely,
KimCollell
8180E. Somerset Lane
Anaheim, CA. 92808
Living in the Anaheimhills since 1976
Sent frommy iPhone
ou don't often get email from ancafc77@gmail. com. Learn why this is important Date: 3/4/2026 8:38:45 AM
From:" Anca Cocan" [email protected]
To:
Ashleigh Aitken" [email protected], " [email protected]" [email protected], " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" NMeeks@anahe im.net, " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected] Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[ EXTERNAL] URGENT: Legal & Safety Opposition to Second Reading of Festival Anaheim Hills Project (EIR No. 358) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
To the Honorable Mayor and Council Members,
I am writing to formally oppose the final adoption of the 447- unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Council to reverse its decision based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay (not 14) According to EIR Appendix C (Responses to Written Comments), the City admits this project results in a "potential extension of time to evacuate by approximately 24 minutes." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone (VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Gov. Code § 65302(g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omission of Regional "Shadow Traffic" and Bypass Volume The Traffic Analysis ( Section 4.17) is fundamentally flawed because it ignores inter- city bypass volume. Fairmont Blvd and Weir Canyon serve as primary "shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Destabilization of the Home Insurance Market The Council has failed to study the project’ s impact on our crumbling insurance market. With premiums in 92807/92808 already surging by 20– 30% this year, adding high-density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a tipping point" for mass insurance non-renewals, potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack of Overriding Considerations The "Statement of Overriding Considerations" is invalid because the City has not exhausted feasible alternatives in safer, transit- rich areas like the Platinum Triangle. You are prioritizing developer convenience over the physical and financial survival of your constituents.
Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th.
Sincerely,
Anca Farcas
8167 E Somerset Ln
Anaheim Ca.92808
ou don't often get email from kalparun@aol. com. Learn why this is important Date: 3/4/2026 9:50:41 AM
From:" [email protected]" [email protected]
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Project
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Good morning,
My understanding is that the following important facts were not considered prior to the 3/3 festival apartment project vote.
Inland Empire ( IE) and Yorba Linda commuters use east Anaheim hills roads as "undocumented" shortcuts. Also 91 freeway from Lake View to Santa Ana Canyon road. This was not factored into their assessment.
Impacts to already high insurance premiums and renewals due to the area being already labeled “ high risk”.
We appreciate your concern in this matter.
Sincerely,
Kalpana
@ 1011 S. Rexford Lane
Sent from AOL on Android
ate: 3/4/2026 10:03:11 AM
From:" John Hughes" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from hughes . john567@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Sent from my iPhone
ate: 3/4/2026 11:03:43 AM
From:" ALBERT MURPHY" [email protected]
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Anaheim Hills Festival Project
You don' t often get email from blurch1@aol. com. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Approval of this project is a major dis appointment for Anaheim Hills residents . Having lived through four evacuations in the Hills and another near mis s that unfortunately turned on Yorba Linda, I have pers onally seen the wind force and devas tation created by brus h fires . Uncontrollable winds at 75 mph, flames moving at 9 miles per minute, traffic conges tion toward very, very limited egres s points are and will continue to be the main is sue. They were the main is sue that defeated the Deer Canyon project but were bas ically ignored in this one - both projects are 1/2 mile apart, so why. Why won’ t ins urance companies ins ure properties here - they seem to know why but small thinking Council members from dis tricts 1-4 don’ t. They choos e revenue, profit, equality over safety. Given the wrong conditions , the Hills are a potential fire trap that may be mitigated by planning and organization, or maybe they won’ t. Try explaining the plan to a 75mph wind. Good luck to us , we’ re going to need it.
Al Murphy
Anaheim Hills
Sent from my iPad
ate: 3/4/2026 2:57:05 PM
From:" Karla Andrade" karly2406@yahoo. com
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from karly2406@yahoo. com. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Karla Andrade
Sent from my iPhone
ate: 3/4/2026 4:35:00 PM
From:" john eun" [email protected]
To:
Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected], " Ryan Balius" [email protected], "Natalie Rubalcava" [email protected], " Public Comment" [email protected]
Cc:" City Clerk" [email protected], "Indhira Y. Gagnon" IGagnon@anahe im.net Subject:[ EXTERNAL] Anaheim Hills Festival site: please vote NO You don' t often get email from john_ eun@yahoo. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
I am writing to formally oppos e the final adoption of the 447- unit project at the Anaheim Hills Fes tival site. The 4-3 vote on March 3rd was bas ed on an incomplete and legally vulnerable record. We urge the Council to revers e its decis ion based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay ( not 14) According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 ( 2020) and Gov. Code § 65302( g)(5), the City is required to ens ure res idential developments in hazard areas have adequate evacuation routes . A $200, 000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analys is (Section 4.17) is fundamentally flawed becaus e it ignores inter- city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary shortcuts " for thous ands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This " shadow traffic" is not documented in local VMT ( Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Des tabilization of the Home Ins urance Market The Council has failed to study the project’ s impact on our crumbling insurance market. With premiums in 92807/ 92808 already surging by 20– 30% this year, adding high-density units to a high-riskzone signals to carriers that the "risk density" has exceeded safe limits . This project acts as a " tipping point" for mass insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack ofOverriding Considerations The "Statement ofOverriding Considerations " is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the PlatinumTriangle.
You are prioritizing developer convenience overthe physicaland financial survival of your constituents.
Thank you to the council members who voted NOon 3/3and forthose that voted yes , please considerthe facts above and Vote NO on March 24th.
Sincerely,
John Eun
872 s Endicott ct, Anaheim
ate: 3/4/2026 4:38:46 PM
From:" John Eun" [email protected]
To:" Public Comment" publiccomment@anaheim. net
Cc:
Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected], " Ryan Balius" [email protected], "Natalie Rubalcava" [email protected], " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected] Subject:[ EXTERNAL] Re: Anaheim Hills Festival site: please reconsider You don' t often get email from john. eun@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
I am writing to formally oppos e the final adoption of the 447- unit project at the Anaheim Hills Fes tival site. The 4-3 vote on March 3rd was bas ed on an incomplete and legally vulnerable record. We urge the Council to revers e its decis ion based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay ( not 14) According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 ( 2020) and Gov. Code * 65302( g)(5), the City is required to ens ure res idential developments in hazard areas have adequate evacuation routes . A $200, 000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analys is (Section 4.17) is fundamentally flawed becaus e it ignores inter- city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary shortcuts " for thous ands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This " shadow traffic" is not documented in local VMT ( Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Des tabilization of the Home Ins urance Market The Council has failed to study the project’ s impact on our crumbling insurance market. With premiums in 92807/ 92808 already surging by 20– 30% this year, adding high-density units to a high-riskzone signals to carriers that the "risk density" has exceeded safe limits . This project acts as a " tipping point" for mass insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack ofOverriding Considerations The "Statement ofOverriding Considerations " is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the Platinum Triangle. You are prioritizing developer convenience overthe physicaland financial survival of your constituents .
Thank you to the council members who voted NOon 3/3and forthose that voted yes , please considerthe facts above and Vote NO on March 24th.
Sincerely,
John Eun and Alice Park
872 s Endicott ct, Anaheim
ate: 3/4/2026 4:42:21 PM
From:" Seung Eun" [email protected]
To:
Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected], " Ryan Balius" [email protected], "Natalie Rubalcava" [email protected], " Public Comment" [email protected], "City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[ EXTERNAL] Anaheim Hills Festival apartments
You don' t often get email from seungbok. eun. 43@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
I am writing to formally oppos e the final adoption of the 447- unit project at the Anaheim Hills Fes tival site. The 4-3 vote on March 3rd was bas ed on an incomplete and legally vulnerable record. We urge the Council to revers e its decis ion based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay ( not 14) According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 ( 2020) and Gov. Code § 65302( g)(5), the City is required to ens ure res idential developments in hazard areas have adequate evacuation routes . A $200, 000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analys is (Section 4.17) is fundamentally flawed becaus e it ignores inter- city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary shortcuts " for thous ands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This " shadow traffic" is not documented in local VMT ( Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Des tabilization of the Home Ins urance Market The Council has failed to study the project’ s impact on our crumbling insurance market. With premiums in 92807/ 92808 already surging by 20– 30% this year, adding high-density units to a high-riskzone signals to carriers that the "risk density" has exceeded safe limits . This project acts as a " tipping point" for mass insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack ofOverriding Considerations The " Statement of Overriding Cons iderations " is invalid becaus e the City has not exhaus ted feas ible alternatives in safer, trans it-rich areas like the Platinum Triangle.
You are prioritizing developer convenience overthe physicaland financial survival of your constituents.
Thank you to the council members who voted NOon 3/3and forthose that voted yes , please considerthe facts above and Vote NO on March 24th.
Sincerely,
Seung Eun
872 s Endicott ct, Anaheim
ate: 3/4/2026 4:35:00 PM
From:" john eun" [email protected]
To:
Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected], " Ryan Balius" [email protected], "Natalie Rubalcava" [email protected], " Public Comment" [email protected]
Cc:" City Clerk" [email protected], "Indhira Y. Gagnon" IGagnon@anahe im.net Subject:[ EXTERNAL] Anaheim Hills Festival site: please vote NO You don' t often get email from john_ eun@yahoo. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
I am writing to formally oppos e the final adoption of the 447- unit project at the Anaheim Hills Fes tival site. The 4-3 vote on March 3rd was bas ed on an incomplete and legally vulnerable record. We urge the Council to revers e its decis ion based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay ( not 14) According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a " potential extens ion of time to evacuate by approximately 24 minutes ." In a wind- driven wildfire in a Very High Fire Hazard Severity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 ( 2020) and Gov. Code § 65302( g)(5), the City is required to ens ure res idential developments in hazard areas have adequate evacuation routes . A $200, 000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omis sion of Regional " Shadow Traffic" and Bypas s Volume The Traffic Analys is (Section 4.17) is fundamentally flawed becaus e it ignores inter- city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary shortcuts " for thous ands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This " shadow traffic" is not documented in local VMT ( Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Des tabilization of the Home Ins urance Market The Council has failed to study the project’ s impact on our crumbling insurance market. With premiums in 92807/ 92808 already surging by 20– 30% this year, adding high-density units to a high-riskzone signals to carriers that the "risk density" has exceeded safe limits . This project acts as a " tipping point" for mass insurance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack ofOverriding Considerations The "Statement ofOverriding Considerations " is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the PlatinumTriangle.
You are prioritizing developer convenience overthe physicaland financial survival of your constituents.
Thank you to the council members who voted NOon 3/3and forthose that voted yes , please considerthe facts above and Vote NO on March 24th.
Sincerely,
John Eun
872 s Endicott ct, Anaheim
ate: 3/6/2026 8:31:02 AM
From:" androspainting@roadrunner. com" androspainting@roadrunner. com To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Re: Logic and Safety: Why the Festival Center Project is a Mistake Some people who received this mes sage don' t often get email from androspainting@roadrunner. com. Learn why this is important at https :// aka. ms /LearnAboutSenderIdentification ]
Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
On Mar 2, 2026, at 11:14 AM, andros painting@roadrunner. com wrote:
Dear Council Member,
I am writing to as k you to vote " No" on the Anaheim Hills Fes tival Center apartment project. You don' t need to be a traffic expert to see that Santa Ana Canyon Road is already at its limit. Mos t days , jus t getting to the store or work is a challenge. The idea that we can add over 400 apartments and about 1300 people to this area without creating a dis as ter during a wildfire evacuation jus t does n't pass the " common sense" tes t.
The city' s own reports admit that it already takes res idents over three hours to get out during a fire. To then say that adding another 7 minutes of delay is " not a big deal" is incredibly frus trating to thos e of us who live here. If a bucket is already overflowing, you don' t keep pouring more water into it and say it's fine. By approving this , the city is bas ically admitting the evacuation plan is broken but choosing to make it even more crowded anyway.
We need our leaders to look at the reality of our streets , not jus t the numbers on a developer' s spreadsheet. Pleas e do the res pons ible thing and protect the res idents who are already here. We need better ways to get out of the Hills , not more people trapped in them. Pleas e vote " No" on this project.
Sincerely,
Tony Megariotis
ou don't often get email from sandra. bridge@rtspecialty. com. Learn why this is important Date: 3/6/2026 9:44:43 AM
From:" Bridge, Sandra" sandra.bridge@rtspecialty. com
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] PROJECT: Anaheim Hills Festival Apartments Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Michael Bridge
Sandra Bridge
284 South Jutewood Street
Anaheim Hills, CA 92808
W e are very concerned over the 4-3 vote to confirm building the subject apartments.
My husband and I have been residents at the above location for 31 years and have raised 3 children at this loc ation.
W e have lived through 3 wildfires ( 2 of which we were evacuated). And I can say the experience of the evac uation was not a pleasant one due to the limited routes to get in and out of the area.
Within the last 2-3 years, I can say that the traffic ( especially on Thursday and Friday evenings) is horrific. I believe this is due to the apps that people use to reroute out of the heavy traffic on the 91 freeway. My specific neighborhood has been bac ked up so bad that getting out or back into my neighborhood has been intolerable. When trying to exit either off Oak Canyon ( where the Serrano traffic backs up on W eir Canyon) or off Riverview to get onto Santa Ana Canyon to W eir is atrocious . People coming down Santa Ana to get on the 91 always block the ongoing traffic proceeding onto Santa Ana by ignoring the red lights and just keep coming through.
I am sure our concerns have already been put out in these meeting and it is beyond com prehension that anyone in their right mind could vote for this project. I would expect those who voted for it do not live in this area and will not be impacted.
I can only imagine what the traffic will be like once these apartments have been built adding thous ands more people. There are already plenty of apartments, condominiums in this area already and there is certainly no reason to build m ore. The impac t alone of the additional people, vehicles, etc. will certainly destroy the peacefulness of this area ( of which has already been enc roached upon due to the redirection of traffic).
W e will be attending the second meeting on 3.24.
eSandy Sandy Briddge
AVP / Inside Broker
Flanagan / Lotfey Team
Mobile: 714.488.8803 / E-Mail: sandra. bridge@rtspecialty. com CA License # 0D57124
RT Specialty, Orange County
2010 Main Street, Suite 400, Irvine, CA 92614
CA License # 0G97516
RSG Specialty, LLC, in California, RSG Specialty Insurance Services, LLC The contents of this email (including any attachments) may contain confidential, proprietary or legally privileged information, and is intended only for the named recipient( s). If this email is not addressed to you, and/or you have received this email in error, please notify the sender immediately and delete the email (including any attachments). Unauthorized dissemination, distribution, disclosure, saving, copying or reliance on this information is unauthorized and strictly prohibited. Ryan Specialty accepts no liability for any damage caused by email communication.
Privacy Notice
Additional Privacy Notice for California Residents
ou don't often get email from ashleyrohner23@gmail. com. Learn why this is important Date: 3/8/2026 12:06:05 PM
From:" Ashley Rohner" ashleyrohner23@gmail. com
To:" Public Comment" [email protected]
Subject:[ EXTERNAL]
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Hello,
As an Anaheim Hills resident, I am writing to express my serious concerns regarding several issues impacting our community’ s safety and local economy. Specifically, I am troubled by flaws in the recent traffic study, inconsistencies within the "Know Your Way" evacuation plan, and the severe parking shortfall.
If these matters are not addressed, they will have a significant negative impact on public safety and our local businesses. I urge you to take the necessary steps to keep Anaheim Hills safe and beautiful.
Thank you for your time and consideration.
Sincerely,
Ashley Rohner
ou don't often get email from slayerpete@gmail. com. Learn why this is important Date: 3/9/2026 6:46:51 AM
From:" peter rohner" slayerpete@gmail. com
To:" Public Comment" [email protected]
Subject:[ EXTERNAL]
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Hello,
As an Anaheim Hills resident, I am writing to express my serious concerns regarding several issues impacting our community’ s safety and local economy. Specifically, I am troubled by flaws in the recent traffic study, inconsistencies within the "Know Your Way" evacuation plan, and the severe parking shortfall.
If these matters are not addressed, they will have a significant negative impact on public safety and our local businesses. I urge you to take the necessary steps to keep Anaheim Hills safe and beautiful.
Thank you for your time and consideration.
Sincerely,
The Rohner family.
ou don't often get email from thirdaxis@sbcglobal. net. Learn why this is important Date: 3/9/2026 11:46:26 AM
From:" thirdaxis Cleveland" thirdaxis@sbcglobal. net
To:"
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "[email protected]" [email protected], " Natalie Meeks" [email protected], "Kristen Maahs" [email protected] Subject:[ EXTERNAL] Logic and Safety: Why the Festival Center Project need thorough reconsideration Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Subject: Thank You for Your Leadership and Request for Continued Review – Anaheim Hills Festival Center Project (DA 2023- 00043)
Dear Mayor Ashleigh Aitken, Councilmember Kristen Maahs, and Councilmember Natalie Meeks, I am speaking for many community members and am writing to sincerely thank each of you for the thoughtful engagement and considerations you demonstrated in voting 'No' on March 3, 2026, regarding the Anaheim Hills Festival Center apartment proposal (Development Application No. 2023-00043 / FEIR No. 358).
You took the citizens seriously and give careful consideration to the well-founded and serious concerns voiced in the public testimony, the presented administrative record, and the legitimate safety issues raised by residents regarding wildfire evacuation capacity, emergency response access, and cumulative infrastructure impacts in Anaheim Hills. The evacuation maps clearly show that each evacuation will spill into an impregnatable traffic grid and bring everything to a stop with no way out.
As a homeowner and resident in Anaheim Hills since 2002 Ihave, along with many other residents, experienced multiple significant wildfire events including the 1993 Eastern Anaheim Hills Fire, 2008 Freeway Complex Fire, and the 2017 Canyon Fire 2. These events were proof of immense evacuation vulnerabilities, particularly along Santa Ana Canyon Road, which remains the primary evacuation corridor for much of the community. In 2017, Serrano feeding into Cannon was closed, Nohl Ranch became an impenetrable grid for those trying to escape our neighborhoods, and it took many of us up to 3 hours to escape down the hill, just to have to escape into side roads as Santa Ana Canyon was completely blocked.
It is our understanding that the proposed project introduces 447 residential units within a Very High Fire Hazard Severity Zone, replacing a historically commercial use within the Anaheim Hills Festival Specific Plan area and requiring a General Plan Amendment, Specific Plan Amendment No. 6, Zoning Code changes, certification of Final EIR No. 358, and adoption of a Statement of Overriding Considerations.
Unlike the prior cinema use, which reflected the already residing population driving to the cinema and home again the residential density introduces:
A permanent 24-hour sleeping population
Children and elderly residents
Mobility-limited and medically vulnerable populations
Increased demand on EMS transport, fire response, and hospital systems In the event of a wildfire, not only the infrastructure/ vehicle evacuations should deserve serious consideration, but also children that need to be picked up from schools, emergency vehicles and fire engines getting access to burning structures, senior evacuations from senior citizen facilities, evacuation of horses from the Saddle club.
And please do bear in mind that a fire doesn't respect rush hour traffic, which we are already suffering under daily from school pick up at El Rancho, to commuters and large commercial vehicles utilizing Serrano, Nohl Ranch and Santa Ana Canyon as shortcuts to Green River, Corona, Riverside and beyond to avoid grids on the 91 Wildfire evacuations rarely follow orderly traffic modeling assumptions. Real evacuation scenarios involve:
Panic-driven departures
Disabled vehicles blocking lanes
Smoke-limited visibility
Simultaneous neighborhood evacuations
Emergency vehicle ingress while residents attempt to exit Congestion is enormous and accelerates in no time at all.
Many of us trust your good judgement and we deeply appreciate your willingness to scrutinize whether the record sufficiently demonstrates a reliable viability with the City’s General Plan Safety Element and adequate wildfire evacuation capacity.
After careful deliberation with concerned residents, we see that there are still Procedural Steps Available Following the March 3, 2026, Vote, as follows:
Although the Council voted 4-3 to approve the project on March 3, 2026, several procedures remai n available before the decision becomes fully final.
1. Request for City Council Rehearing
Under Anaheim Municipal Code §1.12.100, a party may request a City Council rehearing of a decision.
A request must be filed with the City Clerk within seven (7) days of the Council decision and must include a Declaration of Merit identifying grounds such as:
abuse of discretion
lack of jurisdiction
denial of a fair hearing
newly discovered evidence.
Because the Council vote occurred March 3, 2026, the deadline for filing a rehearing request would be: March 10, 2026 If granted, the rehearing would vacate the prior decision and allow the Council to reconsider the project.
2. Second Reading of Ordinances
Projects requiring General Plan and zoning amendments typically require two readings of the ordinance before final adoption, consistent with the City Charter’s legislative procedures.
If the ordinances for this project were introduced on March 3, 2026, the second reading is expected to occur at a subsequent Council meeting later in March.
At that meeting the Council would vote on final adoption of the ordinance, which is a critical final legislative step before the approvals become effective.
3. CEQA Judicial Review
If the City files a Notice of Determination (NOD) following certification of FEIR No. 358, the California Environmental Quality Act provides a 30-day statute of limitations for judicial review.
This would allow parties to challenge the environmental review process, commonly on grounds such as:
inadequate wildfire evacuation analysis
incomplete cumulative impact analysis
insufficient mitigation measures
unsupported Statement of Overriding Considerations.
4. Broader Legislative Options
City councils retain legislative authority to reconsider or rescind certain prior actions where permitted under procedural rules and applicable law, provided such actions comply with the same notice and voting requirements that applied to the origi nal deci sion.
Request for Continued Leadership
Given the significant wildfire evacuation and life-safety concerns raised during the hearing process, I join my neighbors to respectfully ask that you continue to evaluate whether the administrative record sufficiently demonstrates:
Consistency with the General Plan Safety Element (Gov. Code §65302(g)) Adequate system-level wildfire evacuation capacity
Appropriate consideration of cumulative development impacts Whether the Statement of Overriding Considerations adequately justifies overriding significant safety impacts The decision before the Council does not merely approve a single development project; it fundamentally amends long-standi ng land-use planning for the Anaheim Hills commercial core.
These decisions will affect wildfire evacuation risk and infrastructure capacity for decades.
Many Anaheim Hills residents greatly appreciate the time you invested in reviewing this project, and navigating the complexities of the proposed development, and ensuring that public safety concerns were and will continually be very carefully examined.
Local governance requires balancing housing policy, environmental law, and life-safety responsibilities. Your vote demonstrated a commitment to carefully weighing those competing obligations and considering the voice of the people. Especi ally after seeing the dreadful ramifications in the LA fires. Our insurances have either raised the premiums to almost unaffordable heights or completely canceled some insured! If a home is lost, just as in the Palisades and Eaton fires, not only would a homeowner have to continue to pay their mortgage, but also rent for alternative housing, and also wait for an inordinate amount of time on insurances ( if available) and permitting to rebuild. This would invariably result in homeowners havi ng to give up their homes and force them to move. Not to mention loss of life and livelihoods.
Thank you again for your service to the City of Anaheim and for representing the voices of residents who live in wildfire-prone hillside communities.
Respectfully,
Anna Wentges
Long time homeowner and resident inAnaheim Hills
ate: 3/10/2026 2:58:35 PM
From:" Jen McCool" mccooljen@yahoo. com
To:" Public Comment" publiccomment@anaheim. net
Subject:[ EXTERNAL] Festival and thoughts from hearing
Warning: This email originated from outside the City of Anaheim. Do not click links or open attachments unless you recognize the sender and are expecting the message.
Sent from my iPhone
I apologize in advance for being all over the place. I’m in shock and I found the words and ideas of some council to be very sick.
I think it’s fair to say depending on where you live here you have a different perspective. Living here since 95 I can tell you every fire has been very different as well. The last was not good and the fire department was in prepared. Know your way is a joke and residents knew better then the fire department with all due respect.
I also heard mention of weeding or clearing that has taken place. I can not recall in 25 years ever clearing the hill behind me. Property had sprinklers owned by developer turned over to Irvine company then given to national Forrest. Area never maintained. I also heard FD say they work with HOA we gave all the trees and maintenance is non existent and we back the 241. It’s pure fuel. 4 houses from 241 hillside.
In all the reports and ideas done two things have never been addressed and I suppose I’m looking for an answer. One the cut through IE traffic grows by the day and any look at previous years, today or even a year from now are in recognizable especially near Weir Canyon. On Weir Serrano or Santa Ana canyon. I heard last night we had wide roads with shoulders that simply is not true. Two in an evacuation like the last you need to count and realize it’s more then 92808 evacuating it’s Yorba Linda and from there VP and OPA. What measures have been taken coordinating with those cities? Also on a random Tuesday you can not even get near the freeway. I had heard a suggestion to block and allow cars on SAC or freeway to allow people out. As you know those efforts would not work and in stand still traffic your not clearing anything.
I heard a lot about the building codes for this proposal and to be honest that’s not my concern having my own family neighbors etc to get out and as people were stuck on festival parking lot last time because we could not get out the plan is to permanently put another 1k plus people and cars? I heard about fairmont road expansion which I do not believe will do anything but how are we not required to address the situation PRIOR to approving anything regardless? It’s extremely wrecked to do so and I’m sure opens city to liability being it’ s been brought to attention and documented.
I think people are open to change but again like the old Kaiser location that puts no one at risk and is not where traffic cuts through daily to the IE.
I do not know if in your home location you have to travel weir or get across the freeway at night to YL it should not take 45-1 hr to go 2-3 miles. Pics above sorry there is “ no room” as the traffic authority report's and no shoulder on divided highway.
My last concern is look at Savi ranch once thriving center is now dead with an elevated crime rate. Kids play in the run down empty store parking lots. Brilliant of YL part but it destroyed everything.
Even if festival or a similar area was to rezone it should do to our wildfire zone have to stay like other properties 2 stories tall overall speaking.
I would think too after hearing from council I’m voting due to a district not being able to get out we need to do the same hear is criminal and could probably be so on record. There are no wildfires in the city areas and no canyon winds that have blown out windows or ripped tiles off our homes.
Once something is done it’s permanent and a lot of us put every dollar we have into our homes to let some Pissed off council decide our future.
I would also like to point out as it stands fire and emergency personnel has a difficult time getting to certain areas since we do not have shoulders. This is a very narrow city part that goes to the only way out to the IE the congestion is like nothing else in any other city or street.
If other council need to make changes to their district so be it but do not play a game with lives and openly.
This area is a multi city thing not just Anaheim everything here is shared with Yorba Linda sat the very least as well. There project in La Palma was shut down do you traffic evacuation and the fire zone.
I do want clarification as some of these things have never been addressed and I’m curious as to why they have not because they are a huge impact.
Before anything is approved this should be fixed this should never be my view of terror out my window.
Sent from my iPhone
Jennifer
ate: 3/10/2026 3:04:09 PM
From:" Jen McCool" mccooljen@yahoo. com
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Fwd: Festival proposed project NO
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
First off I want to say I’mdisappointed in the fact that any development in this area will have the same negative impact and speaking in them individually appears to be a waste of valuable time.
I also think before and vote is placed that the people voting should experience living here in daily traffic. If you vote for any project here you have never tried to escape a fire. You have no plan coordinated with Yorba Lina Or Villa Park. You have never addressed the issue of this being the bottleneck entrance to the IE that grows daily.
The know your way while I understand the idea behind it, it’s not realistic at all and in an actual fire senario we need to escape or get up any location we can to protect our family. Know your way really does nothing except flood all cars to the freeway which all neighboring cities are also heading the same direction.
Yesterday on a Thursday it was 30 min between Weir and imperial with an average speed of 3-6 mph. Then I will attach a video from Weir and Serrano around 4.
This area of AH just like Yorba Linda, Villa park and OPA are single and double lane roads with no shoulders and no center dividers so unlike downtown areas when there is traffic there is NO WAY for escape or fire or police or ambulance etc to get through.
Wayz has turned this entire area into a flood of cars cutting through to the IE.
Please understand even without a fire a nearly 3 hour window to maybe get out is not ok and with puts of in parking lots or stuck on weir Serrano or Santa Ana canyon and small streets to them in our cars. No coordination with other cities has been done on this please realize Anahrim does not act alone.
I have shared my story before. In last fire I got hit by a fire tornado realizing I could not get out, my husband took hours to get to EL Rabcho to get our son and get to my parents house in Yorba Linda which was also evacuated where homes burned. Our daughter was at Orange Lutheran and a family took her to there home in VP which was evacuated where they then tried to get to another home in OPA that was evacuated roads closed all cars stuck on streets. We were unable to get to her till the middle of the night, then unable to get back together as a family as 4 cities were evacuated and not allowing cars or people back in dues to loss of homes and spot fires.
Festival well I’ll just leave this right here, my husband said it’s like the TITANIC they built thus big beautiful boat with not enough life vests, they knew it and in the end we all know how that panned out.
This new proposal no different from the rest does not help our streets our daily life our ability to leave our homes or ability to get out in a fire. The structure is grossly underestimated and with not enough spots the structure and lower deck of festival would be taken over which would also impact and destroy current businesses which we desperately need here.
What I think you all should be looking at is Savi ranch when YL built those apartments it was impossible to get in and out most times, it turned red on crime map, and nearly every business with the expectation ofthree have gone out of business, it’s a area heavily avoided and difficult to get to and from anyway do to the changes. It’s a mess really.
I’mtired of listening to union workers speak about temp jobs that leave a permanent dangerous disaster behind. You know with the way things are most of us can not just pick up and move to get away.
Also fir the last 5 years straight Anaheim has seen a decline in residence and a trip to google or 1 of 100’ s of articles will tell you they are all leaving to south county to get away from the traffic the high density and the crime, they want clean open streets. Dog parks , trails, less crime, less people. Instead ofdeveloping anything Anaheim should be building open clean spaces. You already know this though. People do NOT want any of this and I believe in other districts there are issues that they brought up that should also be worked out, stick it to the people or I hope you guys die, or make people’ s daily life miserable should not be what we’re voting with.
Please I’masking and I guess begging at this point our quality of life and restriction of movement in our community is at an all time high. The city will be responsible going forward with damage death ambulance and fire personnel that can not make it to us even in a Tuesday in an emergency. We do not and will never have the set up as a downtown area.
Please also note that Yorba Linda turned down project on LA palma directly across the way no builders remedy either due to evacuations and fire and we are in it worse over here. Time to put us first please. I know you can do the right thing for the people instead of city pockets. Let us work together to make the entire city a place to go to not to go from. 1Video
share. icloud. com
Jennifer
Sent from my iPhone
ou don't often get email from jonigaynor@gmail. com. Learn why this is important Date: 3/10/2026 3:56:47 PM
From:" Joni Gaynor" jonigaynor@gmail. com
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Fwd: Save Anaheim Hills
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Forwarded message ---------
From: Joni Gaynor <jonigaynor@gmail. com>
Date: Sun, Feb 1, 2026 at 10:05 PM
Subject: Save Anaheim Hills
To: <publiccomment@anaheim. net>, < aaitken@anaheim. net>, < cleon@anaheim. net>, < rbalius@anaheim. net>, < nrubalcava@anaheim. net>, nkurtz@anaheim. net>, < kmaahs@anaheim. net>, < nmeeks@anaheim. net> Dear Members of the Council,
Thank you for allowing community members to participate in the review of the Festival project. I am writing to formally oppose the proposed residential development at the Festival shopping center and to respectfully request that public comment be reopened at the March 3 City Council meeting.
The developer has been granted additional opportunities to revise, clarify, and present their proposal with respect to them working with union workers. Residents of this community deserve the same opportunity to respond, especially given the seriousness of the safety concerns involved. There are still variables that need to be addressed such as alternative locations for this housing project, the traffic report that has yet to be publically shared, etc. Reopening public comment is essential to maintaining fairness, transparency, and public trust in this process.
My primary concern is evacuation safety, not routine daily traffic. The proposed project relies heavily on the “ Know Your Way” evacuation plan, which remains untested, poorly communicated, and unrealistic under real emergency conditions. During an active wildfire or similar disaster, it is not reasonable to expect residents to behave in a calm, purely rational manner. People will attempt to return home to protect family members, pets, and property, regardless of guidance to do otherwise. This has been proven in fires such as Canyon 2 Fire, Altadena Fires, Paradise Fire, and the Maui Fires.
There is no clear or workable plan for evacuating elderly residents, individuals with disabilities, or children. The facility just behind the proposed Festival project is a senior residence housing facility and drng the last two fires, I had neighbors who could not gain access to them because the road between the proposed Festival project and the senior housing was at a stand still. These populations require additional time, assistance, and coordination, yet the proposal does not address how those needs would be met. The effectiveness of the evacuation approach has not been studied, and there are no clearly defined evacuation timeline goals that demonstrate how long it would take to safely clear the area. This also impacts me personally as I live in the tract just above the proposed Festival project and it took me 2.5 hours to drive from my home to Target ( less than 1/4 mile), jumping the sidewalk to get there.
Changing the Festival site from commercial to residential zoning significantly increases evacuation risk. When fire danger is high, few people are shopping, but when an emergency begins, everyone attempts to go home. Residential development adds hundreds of vehicles that will all be moving simultaneously during an evacuation, placing additional strain on already limited routes.
Finally, approval of this project sets a precedent. Ifthe Festival project is allowed to move forward, it becomes more likely that other large scale projects, such as Deer Canyon or future developments, will also be approved, compounding evacuation risks across the community.
For these reasons, I strongly urge you to reopen public comment at the March 3 meeting and to carefully reconsider this project with evacuation safety as a primary factor. Our community deserves a meaningful opportunity to defend our safety and well being.
Lastly, you took an oath to protect the citizens of your community. I would say that approving this project does just the opposite. This project puts ALL of your District 6 residents in HARM!
Thank you for your time and consideration.
Sincerely,
Joni Gaynor
Joni Gaynor
[email protected]
Joni Gaynor
jonigaynor@gmail. com
ate: 3/10/2026 4:33:42 PM
From:" Linda Ruiz" lindaruiz55@gmail. com
To:
Public Comment" publiccomment@anaheim. net, " Carlos A. Leon" [email protected], "Kristen Maahs" [email protected], " Norma C. Kurtz" [email protected], "Natalie Meeks" [email protected], " Natalie Rubalcava" [email protected], " Ryan Balius" [email protected], "Ashleigh Aitken" [email protected], " Linda Ruiz" Lindaruiz55@gmail. com Subject:[ EXTERNAL] March 24 meeting
You don' t often get email from lindaruiz55@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
To thos e council members who voted yes on the Fes tival project, please recons ider. I have never been involved in city projects but this one hits me pers onally. My family has lived in Anaheim Hills for 25 years and have been evacuated twice. We have done everything pos sible to keep our home safe.
But it is up to you to do the same. Pleas e recons ider this project as lives could be put in danger.
Many believe that people who live here are entitled. This is far from the truth. My hus band and I worked so hard to be able to afford to live here and have never taken it for granted.
Pleas e do not play politics with our lives .
Thank you,
Linda Ruiz
ate: 3/10/2026 8:12:09 PM
From:" Aline Young" alineyoung@me. com
To:" Public Comment" publiccomment@anaheim. net
Subject:[ EXTERNAL] Festival Center Re Hearing Needed
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
I respectfully request a rehearing on this matter because the issue of wildfire risk has not been adequately evaluated or addressed. Anaheim Hills is a high fire severity zone, and any decision that could potentially increase risk to residents deserves the most careful scrutiny.
While development and economic considerations are important, they must never outweigh the fundamental responsibility to protect public safety.
Elected officials are entrusted with maintaining a careful balance between growth and the quality of life and safety of the community. In this case, many residents believe that balance has not been properly achieved.
There is also widespread concern regarding the accuracy and practicality of the proposed evacuation plan. In a fast- moving wildfire scenario, evacuation routes in Anaheim Hills are already limited and heavily constrained. Many residents do not believe the current plan realistically reflects the conditions that would occur during an actual emergency.
Given the potential consequences, it is essential that this issue be reviewed again with full transparency and careful consideration of the fire danger and evacuation realities facing this community.
Aline Young
ou don't often get email from melaniepollak@gmail. com. Learn why this is important Date: 3/10/2026 8:26:57 PM
From:" Melanie Pollak" melaniepollak@gmail. com
To:" Public Comment" publiccomment@anaheim. net
Subject:[ EXTERNAL] No to The Festival Center Development inAnaheim Hills Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Hello,
My name is Melanie Pollak. I'm a 20-year resident of Anaheim Hills and a Destination Services Manager with Visit Anaheim. In my role as a Services Manager, I am always excited to champion new projects and developments in Anaheim, and I work hard to get others excited about new things, as well. However, the 400+ unit development in Anaheim Hills recently approved by the City Council is nothing to be excited about.
While I realize that we need to surge housing in Anaheim, as well as every city in Orange County to meet rising demand, Anaheim Hills lacks the infrastructure to support 600-750 more cars on Santa Ana Canyon, Weir Canyon, and the other roads near the Festival Center. During the last terrible wildfire, it took residents up in the neighborhoods near Festival Center and above, 4 hours to evacuate. Had that fire been fast moving, like the Paradise and Palisades fires, those residents would be dead.
There is an additional safety issue in having so many more cars on roads that house several elementary and middle schools. If parents have to deal with gridlock traffic when getting their kids to school and having to then go to work, there is an increased risk of accidents. Speaking of schools, how many additional students will the schools in Anaheim Hills have to absorb? If there is an increase in students and an increase in drive time to get kids to school, schools will have to allocate additional funds for before and after school care for students who have to be dropped off early in order to allow for parents to get through increased traffic to get to work on time.
If you are quick to say that the cars can just hop on the 91 freeway, you've obviously never been on the 91 West during the morning hours. It's a parking lot. The main streets of Anaheim Hills will also turn into parking lots during heavy morning, afternoon, and evening drive times, and there will be a big countdown to the inevitable of losing green space on the shoulders of our major streets in order to create additional lanes to accommodate increased traffic.
I will say it again, as a champion of new developments in Anaheim, this project will have a significant effect on the quality of life in Anaheim Hills. I strongly urge the Council to reverse course on this development and reject it.
Thank you for your consideration.
Sincerely,
Melanie Pollak - Destination Services Manager, Visit Anaheim 144 N. Rose Blossom Lane, Anaheim Hills
714) 204-6183
ate: 3/11/2026 5:02:55 PM
From:" Donna Holland" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Logic and Safety: Why the Festival Center Project is a Mistake You don' t often get email from holland_ donna@icloud. com. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to as k you to vote " No" on the Anaheim Hills Fes tival Center apartment project. You don' t need to be a traffic expert to see that Santa Ana Canyon Road is already at its limit. Mos t days , jus t getting to the store or work is a challenge. The idea that we can add over 400 apartments and about 1300 people to this area without creating a dis as ter during a wildfire evacuation jus t does n't pas s the " common sens e" test.
The city' s own reports admit that it already takes res idents over three hours to get out during a fire. To then say that adding another 7 minutes of delay is " not a big deal" is incredibly frus trating to thos e of us who live here. If a bucket is already overflowing, you don' t keep pouring more water into it and say it's fine. By approving this , the city is bas ically admitting the evacuation plan is broken but choosing to make it even more crowded anyway.
We need our leaders to look at the reality of our streets , not jus t the numbers on a developer' s spreadsheet. Pleas e do the res pons ible thing and protect the res idents who are already here. We need better ways to get out of the Hills , not more people trapped in them. Pleas e vote " No" on this project.
Sincerely,
Donna Holland
944 S. Camerford lane
Anaheim Hills
ou don't often get email from knaval07@yahoo. com. Learn why this is important Date: 3/13/2026 11:46:29 AM
From:" Navin Kumar" knaval07@yahoo. com
To:
Ashleigh Aitken" [email protected], " [email protected]" [email protected], " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" NMeeks@anahe im.net, " Ryan Balius" [email protected], " Natalie Rubalcava" [email protected] Cc:"
Public Comment" publiccomment@anaheim. net, " City Clerk" [email protected], "Indhira Y. Gagnon" [email protected]
Subject:[ EXTERNAL] URGENT: Legal & Safety Opposition to Second Reading of Festival Anaheim Hills Project (EIR No. 358) Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
To the Honorable Mayor and Council Members,
I am writing to formally oppose the final adoption of the 447- unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Counc il to reverse its decision based on the following:
1. Failure to Mitigate the Documented 24-Minute Evacuation Delay (not 14) According to EIR Appendix C (Responses to Written Comments), the City admits this proje ct results in a "pote ntial extensio n of time to evacuate by approximately 24 minutes." In a wind- driven wildfire in a Very High Fire Hazard Seve rity Zone ( VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Gov. Code § 65302 (g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating.
2. Omission of Regional " Shadow Traffic" and Bypass Volume The Traffic Analysis ( Section 4.17) is fundamentally flawed because it ignores inter- city bypass volume . Fairmont Blvd and Weir Canyon serve as primary "shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This " shadow traffic" is not documented in local VMT (Vehicle Miles Trave led) studie s but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element.
3. Economic Destabilization of the Home Insurance Market The Council has failed to study the project’ s impact on our crumbling insurance marke t. With premiums in 92807/92808 already surging by 20–30% this year, adding high-density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a "tipping point" for mass insurance non-renewals, potentially rendering thousands of existing homes uninsurable and unsellable.
4. CEQA Inconsistency and Lack of Overriding Considerations The "Statement of Overriding Considerations" is invalid because the City has not exhauste d feasible alternatives in safer, transitrich areas like the Platinum Triangle. You are prioritizing developer convenience over the physical and financ ial survival of your constituents.
Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th.
Sincerely,
Navin Kumar
225 S. Loganberry St
Anaheim, CA 92808
ate: 3/16/2026 7:23:51 PM
From:" RAZVAN UNGUREANU" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from razvan_ ucla@icloud. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Razvan Ungureanu
ate: 3/17/2026 9:19:40 PM
From:" Emalee Cramer" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Concerns about the Festival Center Project and Wildfire Safety You don' t often get email from emalee. hatch@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I moved to Anaheim Hills becaus e it is a beautiful, family- oriented community, but I am very concerned about the propos ed Shea/ Fes tival Center apartment project.
Since moving here, I've learned that our neighborhood is in a high- ris k fire zone with very limited ways to get out. I was shocked to read that it already takes over three hours to evacuate this area during an emergency. Adding over 1,000 more people and their cars to our streets seems like a huge ris k to everyone' s safety.
The project' s environmental report admits that thes e new apartments will make evacuation times even longer. As a parent, I think about what would happen if a fire broke out while I was trying to get my [ kids /pets / elderly parents ] to safety. If the roads are already failing, adding hundreds more cars into the mix will make a bad situation impos sible. It feels like the city is hoping for the bes t rather than planning for the worst.
I am not agains t new hous ing in general, but it has to be built in the right places . Putting high- dens ity hous ing at a known bottleneck in a fire zone is not res pons ible.
I am as king you to pleas e put our safety firs t and vote " No" on this project until we have a real solution for getting people out of the Hills safely.
Sincerely,
Sent from my iPhone
ate: 3/18/2026 9:59:18 AM
From:" Joy Pickett" [email protected]
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Festival Project
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Please vote NO! This development will put us all - current and future homeowners - in jeopardy during fire season. Many will die.
Joy Pickett
ate: 3/18/2026 2:23:20 PM
From:" Tony" tonytech34@yahoo. com
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from tonytech34@yahoo. com. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Subject: Pleas e vote NO on the Shea/ Fes tival Center apartments – It's a safety issue Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Tony G.
ate: 3/18/2026 4:18:07 PM
From:" Betty Farnsworth" bettypfarnsworth@gmail. com
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Festival center development
You don' t often get email from bettypfarns worth@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Hello,
As a 60 year res ident of the city of Anaheim, I am writing to as k you to vote NO on the propos ed 447 unit apartment building at The Fes tival Center.
The Fes tival Center is in a Very High Fire Severity Zone.
The evacuation route is one road only. Santa Ana Canyon to get to the 91 via Weir or Imperial. TOTAL DISASTER Anaheim contracted with Dudek ( same company that did the study for Shea Fes tival project) to conduct a Wildfire Evacuation Study. I actually attended the community meeting that Dudek conducted.
To date, there has not been a releas e of res ults from that study. Where is that information? The city council voted agains t the SALT propos ed Deer Canyon development, citing the Very High Fire Severity Zone as well as significant evacuation concerns .
Thos e conditions are the EXACT same for the Fes tival project. Therefore the Fes tival Project also requires a NO vote.
I do unders tand there has been significant development in some of the other districts in our city. NONE of thos e developments are in a Very High Fire Severity Zone like this project.
I urge that a different location be identified in AnaheimDistrict 6 that is NOT subject to these extremely dangerous conditions and not allowing any development on Santa Ana Canyon until infrastructure improvements (ie Fairmont overcrossing) is completed.
PROTECTINGLIVES OF RESIDENTS THROUGHOUT THECITYOFANAHEIM ISEVERYCOUNCILPERSONS RESPONSIBILITY.
IT DOES NOT MATTERWHICH DISTRICT YOU REPRESENT.
WEAREALLANAHEIM RESIDENTS.
Please do right by the citizens ofAnaheimand vote NO.
Thank you,
Betty Farnsworth
ou don't often get email from jhuang77. tw@gmail. com. Learn why this is important Date: 3/18/2026 6:12:29 PM
From:" Julie Huang" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Council Member,
I am writing to you as a resident of Anaheim to ask you to please vote "No" on the proposed apartments at the Anaheim Hills Festival Center. I lived here during the Freeway Fire and Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get closer, and literally not moving for over an hour. It wasn't just "traffic"— it was a total standstill. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same escape route is terrifying to those of us who have actually been in that situation.
The reports for this project say that adding these cars will "only" add about 7 minutes to the evacuation time. But when you're already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don't have extra roads or "secret" ways out of the Hills; we all end up on the same few lanes. Adding more people to a neighborhood that is already a bottleneck during a fire just feels like a tragedy waiting to happen.
I understand that the city needs housing, but it shouldn't be built in a place where people are already struggling to get out safely. Please don't make an existing danger even worse just for a new development. We are asking you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Julie Huang
ate: 3/18/2026 8:16:25 PM
From:" Tracy O'Day" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from odayx3@gmail. com. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you again as a res ident of Anaheim in the Summit community by Running Springs Elementary School to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center.
As stated previous ly, I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car for hours , watching the smoke get clos er, and barely moving down Santa Ana Canyon Rd. It was n't jus t "traffic"— it was a total standstill. The thought of adding hundreds of new apartments and 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads out of the Hills; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
At the las t meeting, I heard that a Wildfire Evacuation Study was approved. I heard that it was suppos ed to be delivered in January, but it remains unreleas ed. How can it be approved if it has not been releas ed? And how can you be sure that the plan actually works ? And If the report is needed for CEQA compliance, then how can the city be compliant without the releas ed report? So without the Evacuation Study, there’ s really no proof that res idents in Anaheim Hills will be safe in an emergency evacuation.
Another point, does the Wildfire Evacuation Study include the addition ofthe new housing units , or was it done with just the existing homes ? Ifnot done with the proposed new housing and additional 1000+ residents , wouldn’t that need to be done and released before the report can be approved? I understand that the city needs housing, but it shouldn't be built in a place that has high fire danger where people are already struggling to evacuate safely. Please don't make an existing danger even worse just for a new development. We are asking you to prioritize the lives and safety of the people who already live and pay taxes here.
Thank you for listening to my concerns and Ihope you willput our community safety first by voting NOon building this development.
Sincerely,
Tracy O’Day
8724EGarden View Drive
Sent frommy iPhone
ate: 3/18/2026 8:18:00 PM
From:" Sharon Huang" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Logic and Safety: Why the Festival Center Project is a Mistake You don' t often get email from sh1070@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to as k you to vote " No" on the Anaheim Hills Fes tival Center apartment project. You don' t need to be a traffic expert to see that Santa Ana Canyon Road is already at its limit. Mos t days , jus t getting to the store or work is a challenge. The idea that we can add over 400 apartments and about 1300 people to this area without creating a dis as ter during a wildfire evacuation jus t does n't pas s the " common sens e" test.
The city' s own reports admit that it already takes res idents over three hours to get out during a fire. To then say that adding another 7 minutes of delay is " not a big deal" is incredibly frus trating to thos e of us who live here. If a bucket is already overflowing, you don' t keep pouring more water into it and say it's fine. By approving this , the city is bas ically admitting the evacuation plan is broken but choosing to make it even more crowded anyway.
We need our leaders to look at the reality of our streets , not jus t the numbers on a developer' s spreadsheet. Pleas e do the res pons ible thing and protect the res idents who are already here. We need better ways to get out of the Hills , not more people trapped in them. Pleas e vote " No" on this project.
Sincerely,
Sent from my iPhone
ou don't often get email from hughes. lori.lynn@gmail. com. Learn why this is important Date: 3/19/2026 12:39:14 AM
From:" Lori Hughes" [email protected]
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Fwd: Anaheim Hills Festival Center Project Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Forwarded message ---------
From: Lori Hughes <hughes. lori.lynn@gmail. com>
Date: Sun, Feb 8, 2026 at 10:29 AM
Subject: Fwd: Anaheim Hills Festival Center Project
To: <DJ_hughes@hotmail. com>
Forwarded message ---------
From: Lori Hughes <hughes. lori.lynn@gmail. com>
Date: Wed, Feb 4, 2026 at 1:57 AM
Subject: Fwd: Anaheim Hills Festival Center Project
To: <hughes. kim@gmail. com>
Forwarded message ---------
From: Lori Hughes <hughes. lori.lynn@gmail. com>
Date: Tue, Feb 3, 2026 at 3:10 PM
Subject: Re: Anaheim Hills Festival Center Project
To: <publiccomment@anaheim. net>
February 3, 2026
City of Anaheim
Mayor and Members of the City Council
Regarding: Anaheim Hills Festival Center
447-unit residential project ( Development Application No. 2023- 00043) Dear Mayor and Members of the City Council,
I am writing to formally express my opposition to the proposed 447-unit residential development at Anaheim Hills Festival Center.
I am an Anaheim Hills resident, and my entire family have been Anaheim Hills residents for the last 25 years.
I am kindly requesting that the real life and death concerns regarding evacuations in our community be taken very seriously. Voting yes on the housing development at Festival Center will bring too many additional cars into the mix, making evacuations during a fire far more difficult and dangerous than was already the case in previous fires.
I have heard that things will be done differently when the next fire comes to our community, but this offers no assurance at all! Whatever different evacuation scenarios have been proposed, have not been tested in real life! The infrastructure remains the same, no matter what! The typical time to travel 1/4 to 1/2 mile during the 2017 fires was about 2 1/2 hours. How could that have even been acceptable to begin with! This supposed 7 additional minutes evacuation time to get out with the new housing project is absolutely preposterous!!! Fires are unpredictable, people in a panic are unpredictable. It’s a nice idea to think that allwould go well and be fine, but that is simply not realistic! Eleven of my family members reside inAnaheim Hills (including my 93 year old mother). Six members of my family live behind or near the Festival Center. They have been through the last few fires, and their experiences during the 2017 evacuation were terrifying!!! I am deeply concerned about the safety and well being of my family members, and neighbors who live here! I know that in a real life situation, I would stop at nothing to rescue a member of my family. I have heard others state exactly the same thing! The new controlled “ test plans” to evacuate the area is not enough to justify voting yes on this project. Test plans are just that, test plans.
Please, please, don’t dismiss the community’ s real life and death concerns that are based on past frightening experiences and credible, well documented evidence concerning the very real lack of infrastructure for this project.
Thank you for taking the time to read this, and take seriously these things.
Sincerely yours,
Lori Hughes
ate: 3/19/2026 7:58:33 AM
From:" Rouhina Mehregan" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from rouhina. m@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Rouhina Mehregan
6881 E Kentucky
Sent frommy iPhone
ou don't often get email from scottshuff@me. com. Learn why this is important Date: 3/19/2026 7:58:55 AM
From:" Scott Shuff" scottshuff@me. com
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Council Member,
I am writing to you as a resident of Anaheim to ask you to please vote "No" on the proposed apartments at the Anaheim Hills Festival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get closer, and literally not moving for over an hour. It wasn't just "traffic"— it was a total standstill. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same escape route is terrifying to those of us who have actually been in that situation.
The reports for this project say that adding these cars will "only" add about 7 minutes to the evacuation time. But when you're already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don't have extra roads or "secret" ways out of the Hills; we all end up on the same few lanes. Adding more people to a neighborhood that is already a bottleneck during a fire just feels like a tragedy waiting to happen.
I understand that the city needs housing, but it shouldn't be built in a place where people are already struggling to get out safely. Please don't make an existing danger even worse just for a new development. We are asking you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Scott Shuff
714.276.4116
scottshuff@me. com
Sent from my iPhone
ou don't often get email from hwakely@gmail. com. Learn why this is important Date: 3/19/2026 9:12:47 AM
From:" Heather W" [email protected]
To:" Public Comment" publiccomment@anaheim. net
Subject:[ EXTERNAL] Vote NO on the Festival Project / public comment Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Please accept this letter as written public comment against the proposed Festival Project, a high-density housing development located within a designated Very High Fire Hazard Severity Zone.
I am writing to ask you to vote "No" on the Anaheim Hills Festival Center apartment project. The city's own reports admit that it already takes residents over three hours to get out during a fire. To then say that adding another 7 minutes of delay is "not a big deal" is incredibly frustrating to those of us who live here. If a bucket is already overflowing, you don't keep pouring more water into it and say it's fine. By approving this, the city is basically admitting the evacuation plan is broken but choosing to make it even more crowded anyway.
We need our leaders to look at the reality of our streets, not just the numbers on a developer' s spreadsheet. Please do the responsible thing and protect the residents who are already here. We need better ways to get out of the Hills, not more people trapped in them. Please vote "No" on this project.
Sincerely,
Heather Wakely
District 6
ate: 3/19/2026 7:12:11 AM
From:" Mike Bebb" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Logic and Safety: Why the Festival Center Project is a Mistake You don' t often get email from mcbebb@gmail. com. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
We are writing to as k you to vote " No" on the Anaheim Hills Fes tival Center apartment project. You don' t need to be a traffic expert to see that Santa Ana Canyon Road is already at its limit. Mos t days , jus t getting to the store or work is a challenge. The idea that we can add over 400 apartments and about 1300 people to this area without creating a dis as ter during a wildfire evacuation jus t does n't pass the " common sense" tes t.
The city' s own reports admit that it already takes res idents over three hours to get out during a fire. To then say that adding another 7 minutes of delay is " not a big deal" is incredibly frus trating to thos e of us who live here. If a bucket is already overflowing, you don' t keep pouring more water into it and say it's fine. By approving this , the city is bas ically admitting the evacuation plan is broken but choosing to make it even more crowded anyway.
We need our leaders to look at the reality of our streets , not jus t the numbers on a developer' s spreadsheet. Pleas e do the res pons ible thing and protect the res idents who are already here. We need better ways to get out of the Hills , not more people trapped in them. Pleas e vote " No" on this project.
Sincerely,
Mike & Joy Bebb
969 South Dylan Way
The Highlands
AnaheimHills
ate: 3/19/2026 10:41:07 AM
From:" Krystyna Kisting" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from aagirl@s bcglobal. net. Learn why this is important at https :// aka. ms/ LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Krys tyna Kis ting
Sent from my iPhone
ou don't often get email from baradam@aol. com. Learn why this is important Date: 3/19/2026 11:25:00 AM
From:" Rick Clark" [email protected]
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Apartments inFestival
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
When people vote for a project like this it reinforces what they don't know. My wife and I grew up in West Anaheim ,she also lived in East Anaheim and we owned our first home in downtown Anaheim. We never knew anything about wildfires and Santa Ana winds until we moved to Anaheim Hills. We have had a fire burn up to a 100 yards from us.and have had the warning knock that evacuation was close another four.The council members who supported this vote have a detached and uncaring attitude regarding the horror of these events ,comparing them to contained fires in city areas, not even close to the same issue.
We are proud lifetime residents of Anaheim. Please don't put our lives in further danger.
Rick Clark ,7655 E. Calle Durango ,Anaheim
ate: 3/19/2026 11:28:52 AM
From:" Herm Rittner" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from hrittner@gmail. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely, Hermann Rittner
ou don't often get email from dheinbuch@sbcglobal. net. Learn why this is important Date: 3/19/2026 11:33:32 AM
From:" Danielle Heinbuch" dheinbuch@sbcglobal. net
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Logic and Safety: Why the Festival Center Project is a Mistake Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Subject: Logic and Safety: Why the Fes tival Center Project is a Mis take Dear Council Member,
I am writing to as k you to vote " No" on the Anaheim Hills Fes tival Center apartment project. You don' t need to be a traffic expert to see that Santa Ana Canyon Road is already at its limit. Mos t days , jus t getting to the store or work is a challenge. The idea that we can add over 400 apartments and about 1300 people to this area without creating a dis as ter during a wildfire evacuation jus t does n't pas s the " common sens e" test.
The city' s own reports admit that it already takes res idents over three hours to get out during a fire. To then say that adding another 7 minutes of delay is " not a big deal" is incredibly frus trating to thos e of us who live here. If a bucket is already overflowing, you don' t keep pouring more water into it and say it's fine. By approving this , the city is bas ically admitting the evacuation plan is broken but choosing to make it even more crowded anyway.
We need our leaders to look at the reality of our streets , not jus t the numbers on a developer' s spreadsheet. Pleas e do the res pons ible thing and protect the res idents who are already here. We need better ways to get out of the Hills , not more people trapped in them. Pleas e vote " No" on this project.
Sincerely,
Danielle Heinbuch
Anaheim Hills Res ident
ate: 3/19/2026 11:38:12 AM
From:" Herm Rittner" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get clos er, and literally not moving for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely Nella Rittner 224 S Owens Dr. Anaheim
ate: 3/19/2026 3:31:07 PM
From:" Douglas R Robbins" dugray43@sbcglobal. net
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Festival 447 Unit Apartment Project Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Mayor and Council Members,
I am writing you to vote NO vote on this Project. This project does not make any logical sense. We are in a very high fire risk zone with an already 3 hour estimated evacuation time. So lets add 1000 plus more cars to that? How does that make sense? It is my belief, as well as many others. That there is some shady dealings going on behind closed doors with this Counci l.
Particularly Natalie Meeks, Natalie Rubalcava and Norma Campos Kurtz. Ifind their relationships with Kurt Pringle as well as the Carpenters Union to be worrisome. I believe they are selling their votes to these organizations in exchange for donations. And by the way, those young folks that spoke at the last meeting in favor of the project. Were paid by Kurt Pringle, at least that's what they told someone on the way in to the meeting.
There is no other explanation for the Council to go against the 300 plus residents, wishes on this Project. These kind of corruption didn't work out well for Harry Sidhu, and isn't going to work out well for them either. Please look in to this matter. It is my understanding that the Council is scheduled to make a final vote on this Project on March 24, I will see you there! Thank you.
Douglas Robbins
8141 E. Kennedy Road
Anaheim Ca 92808
626-548-1475
ou don't often get email from shelley.shuff@me. com. Learn why this is important Date: 3/20/2026 8:41:52 AM
From:" Shelley Shuff" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] STOP Anaheim Hills Festival Project Number: DEV2023-00043 Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Mayor Aitken and Council Members,
Thank you in advance for your time and consideration.
I live at 7976 E. Altair Lane in Anaheim Hills where I have been a resident for over 32 years.
I am writing to express my concerns regarding the Anaheim Hills Festival Project Number: DEV2023- 00043 to add 447 multiple- family attached residential units. Adding a complex with at least 1,000 more residents would be disastrous for our community’ s safety.
Please consider the negative impact such a project would have on an already existing congested traffic problem, especially the issue of evacuation in a fire.
My family has personally experienced several evacuations. During one of the fires we were unable to leave the area. Traffic was gridlocked. Police blocked access to get elderly out it the senior apartments on Festival. I literally looked him in the eye and told him he was going to be responsible for the death of trapped seniors. I moved the barrier, my husband drove in and we were able to get my disabled 80 year old mom out. We could not drive any further so we fearfully sat in our car in the Festival parking lot for over 6 hours with our children and 80 year old mother in our car as we watched the fires all around us.
Our neighbor and local retired Fire Chief has expressed his great concern for adding more than 800- 1,000 permanent residents at Festival Center.
The additional traffic would be a detriment to our safety. Please protect our community and our lives by preventing this project from proceeding.
Your careful consideration is greatly appreciated.
Sincerely,
Shelley Shuff
ou don't often get email from debhawkins1@yahoo. com. Learn why this is important Date: 3/20/2026 11:15:26 AM
From:" Debbie Hawkins" debhawkins1@yahoo. com
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Logic and Safety: Why the Festival Center Project is a Mistake Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
De a r C o unci l Me m be r,
I am w riting to a s k yo u to vo te "No " o n the Ana he im Hills Fe s tiva l C e nte r a pa rt m e nt p ro je ct .
Y o u do n 't ne e d to be a tra ffic e xp e rt to se e tha t Sa nta Ana Ca nyo n R o a d is a lre a dy a t its lim it . M o s t da ys , jus t ge tting to the s to re o r work is a ch a lle nge . The ide a tha t we ca n a dd o ve r 400 a p a rt m e nts a nd a bout 1300 pe o ple to thi s a re a w itho ut cre a ting a disa s te r duri ng a w ild fire e va cu a tio n jus t do e sn 't pa s s the " co m mo n s e nse " te s t . The ci ty' s ow n re po rt s a dmi t tha t it alre a dy ta ke s re s ide nts o ve r thre e ho urs to ge t o ut duri ng a fire . To the n sa y tha t a dding a no the r 7 mi nute s o f de la y is " no t a big d e a l " is incre dibly fru s tra ting to tho s e o f us w ho live he re . If a bucke t is a lre ady o ve rflow ing , yo u d o n 't ke e p p o uring m o re w a te r into it a nd s a y it 's fine .
By a ppro ving this , the ci ty is ba s ica lly a dm itting the e va cu a tio n plan is b ro ke n but ch o o s ing to m a ke it e ve n m ore cro w de d a nyw a y. W e ne e d o ur le a de rs to lo o k at the re ality o f o ur s tre e ts , no t jus t the num be rs on a de ve lope r's spre a ds he e t . Ple a se do the re spons ible thing a nd pro te ct the re s ide nts who a re a lre a dy he re . W e ne e d be tte r wa ys to ge t out o f the H ills , no t mo re p e o p le tra p p e d in the m . P le a se vo te N o " on this pro je ct .
Si nce re ly,
De bbie H awki ns
ome people who received this message don't often get email from k_hines@charter. net. Learn why this is important Date: 3/20/2026 1:59:47 PM
From:" [email protected]" [email protected]
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vot No on the Shea/Festival Center Apartments for safety reasons Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Dear Council Member,
I am writing to you as a resident of Anaheim to ask you to please vote "No" on the proposed apartments at the Anaheim Hills Festival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get closer, and literally not moving for over an hour. It wasn't just "traffic"— it was a total standstill.
Our entire neighborhood was in a state of chaos, parents attempting to rescue their children from schools then getting stuck in standstill traffic with nowhere to go.
Our neighborhood was completely closed in, told to evacuate but due to the location of the schools and no street outlets we were stuck.
The thought of adding hundreds of new apartments and about 1000+ more people to that exact same escape route is terrifying to those of us who have actually been in that situation.
The reports for this project say that adding these cars will "only" add about 7 minutes to the evacuation time. But when you're already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don't have extra roads or "secret" ways out of the Hills; we all end up on the same few lanes. Adding more people to a neighborhood that is already a bottleneck during a fire just feels like a tragedy waiting to happen.
There is a pending road project for the 241 Toll Road to funnel Northbound traffic directly into the toll road East bound is only going to cause an unforeseen domino effect just as prior efforts to divert the Riverside traffic have caused. That Riverside traffic is only going to get worse as more housing developments are currently being built and will be ongoing until they run out of room on the 15 freeway.
I understand that the city needs housing, but it shouldn't be built in a place where people are already struggling to get out safely. Please don't make an existing danger even worse just for a new development. We are asking you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Katherine Hines
Stephen Waterman
1200 S Silver Star Way
Anaheim, CA 92808
ou don't often get email from bmwinger@gmail. com. Learn why this is important Date: 3/20/2026 3:51:27 PM
From:" Bridget Winger" bmwinger@gmail. com
To:" Public Comment" [email protected]
Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Subject: Please vote NO on the Shea/Festival Center apartments – It's a safety issue Dear Council Member,
I am writing to you as a resident of Anaheim to ask you to please vote "No" on the proposed apartments at the Anaheim Hills Festival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck in my car, watching the smoke get closer, and literally not moving for over an hour. It wasn't just "traffic"— it was a total standstill. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same escape route is terrifying to those of us who have actually been in that situation.
The reports for this project say that adding these cars will "only" add about 7 minutes to the evacuation time. But when you're already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don't have extra roads or "secret" ways out of the Hills; we all end up on the same few lanes. Adding more people to a neighborhood that is already a bottleneck during a fire just feels like a tragedy waiting to happen.
I understand that the city needs housing, but it shouldn't be built in a place where people are already struggling to get out safely. Please don't make an existing danger even worse just for a new development. We are asking you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Bridget Winger
District 6 resident
ate: 3/20/2026 4:34:13 PM
From:" Wayne Hawkins" kwhawk1949@yahoo. com
To:
Public Comment" publiccomment@anaheim. net, "Ashleigh Aitken" AAitken@anahe im.net, "Carlos A. Leon" [email protected], " Ryan Balius" [email protected], " Natalie Rubalcava" NRubalcava@anahe im.net, " Norma C. Kurtz" [email protected], "Kristen Maahs" [email protected], " Natalie Meeks" [email protected] Subject:[ EXTERNAL] Please vote NO on the Shea/Festival Center apartments – It's a safety issue You don' t often get email from kwhawk1949@yahoo. com. Learn why this is important at https:// aka. ms /LearnAboutSenderIdentification ] Warning: This email originated from outs ide the City of Anaheim. Do not click links or open attachments unles s you recognize the sender and are expecting the mes sage.
Dear Council Member,
I am writing to you as a res ident of Anaheim to as k you to pleas e vote " No" on the propos ed apartments at the Anaheim Hills Fes tival Center. I lived here during the Canyon Fire 2 in 2017, and I will never forget the feeling of being stuck, watching the smoke get clos er, and literally not being able to get out of my neighborhood for over an hour. It was n't jus t "traffic"— it was a total stands till. The thought of adding hundreds of new apartments and about 1000+ more people to that exact same es cape route is terrifying to thos e of us who have actually been in that situation.
The reports for this project say that adding thes e cars will " only" add about 7 minutes to the evacuation time. But when you' re already stuck for three hours and the fire is moving toward you, 7 minutes is a lifetime. We don' t have extra roads or " secret" ways out of the Hills ; we all end up on the same few lanes . Adding more people to a neighborhood that is already a bottleneck during a fire jus t feels like a tragedy waiting to happen.
I unders tand that the city needs hous ing, but it shouldn' t be built in a place where people are already struggling to get out safely. Pleas e don' t make an exis ting danger even wors e jus t for a new development. We are as king you to prioritize the lives and safety of the people who already live here and pay taxes here.
Sincerely,
Sent from Wayne' s iPad.
Kenneth W Hawkins
7564ECamino Tampico
Anaheim
92808
ou don't often get email from jfilppi@gmail. com. Learn why this is important Date: 3/21/2026 10:16:58 AM
From:" Julie Filppi" [email protected]
To:
Ashleigh Aitken" [email protected], " Ryan Balius" [email protected], " Carlos A. Leon" [email protected], " Natalie Rubalcava" [email protected], " Norma C. Kurtz" [email protected], Kristen Maahs" [email protected], "Natalie Meeks" [email protected], " Public Comment" publiccomment@anaheim. net
Subject:[ EXTERNAL] Festval Development CEQA Violation
Attachment:
Rudy Emami City Council Agenda Report March 25 2025.pdf;Zone 10 KnowYourWay.jpg;Zone 11 KnowYourWay.jpg;Zone 9 KnowYourWay.jpg;4.9-2_Evacuation Travel Time Analysis Figure 7 Only.pdf;Zone 8 KnowYourWay.jpg;
Warning: This email originated fromoutside the City of Anaheim. Do not click links or open attachme nts unless you recognize the sender and are expecting the message.
Mayor and City Council Members,
The proposed Festival Center Development is not merely problematic— it is in clear violation of California Environmental Quality Act (CEQA).
The project fundamentally undermines the established Know Your Way Evacuation Plan that was in place at the time the Final Environmental Impact Report ( FEIR) was prepared, and there is no feasible mitigation for this impact.
When the FEIR was developed, the Know Your Way Plan was not hypothetical or “fluid”— it was publicly posted, formally distributed, and actively relied upon by residents. It is the baseline condition CEQA requires to be analyzed. Any deviation from that baseline is not a minor oversight; it is a failure to comply with the law.
The FEIR asserts that, in the event of a worst- case fire scenario in Deer Canyon, all traffic along Santa Ana Canyon Road would move westbound toward Imperial Highway. This claim is flatly inconsistent with the City’s own evacuation plan. The Know Your Way Plan explicitly directs residents in Zones 11, 10, 9, and 8 to evacuate eastbound on Santa Ana Canyon Road toward Weir Canyon Road— directly through the location of the proposed development. Ignoring this reality does not make the conflict disappear; it renders the FEIR inaccurate and legally deficient.
City staff have attempted to justify this discrepancy by describing the evacuation plan as “fluid.” That characterization is irrelevant under CEQA.
The law does not permit agencies or developers to rely on vague, shifting assumptions to avoid analyzing real, documented conditions. CEQA requires a good-faith, evidence- based analysis of the actual plan in effect— not a speculative alternative that minimizes impacts on paper.
Further compounding this issue, the City allocated $ 180,000 in public funds to develop a comprehensive wildfire evacuation study for the Anaheim Hills area. Yet despite repeated public records requests, residents have been denied access to this information. This lack of transparency raises serious concerns about what the analysis might reveal and why it has not been disclosed.
At a recent City Council meeting, Council Member Meeks expressed confidence in the current evacuation plan. However, Director of Public Works, Rudy Emami, suggests a far less certain assessment. His City Council Agenda Report dated March 25, 2025 ( see attached) outlines deficiencies that directly mirror the concerns residents have consistently raised. These contradictions cannot be ignored— they underscore the need for a clear, honest, and legally compliant analysis.
To be clear: the evacuation plan in effect in September 2025, when the FEIR was finalized, is the only plan that can legally serve as the basis for analysis. The developer does not have the authority to revise or reinterpret that plan to make the project appear acceptable. Yet that is exactly what appears to have occurred in the FEIR Appendix 4.9-2 (Evacuation Travel Time Analysis, Figure 7).
This is not a technicality. It is a violation of CEQA, and it demands correction.
Sincerely,
Julie Filppi – Anaheim Resident since 1972
200 S. Anaheim Blvd.
Second Floor
Anaheim, CA 92805
Tel: (714) 765-5176
Fax: (714) 765-5225
www. anaheim. net
CITY COUNCIL AGENDA REPORT
City of Anaheim
DEPARTMENT OF PUBLIC WORKS
DATE: MARCH 25, 2025
FROM: DEPARTMENT OF PUBLIC WORKS
SUBJECT: CONSULTANT SERVICES AGREEMENT WITH DUDEK FOR
THE CITY OF ANAHEIM WILDFIRE EVACUATION PLAN
ATTACHMENT (Y/N): YES ITEM # 14
GOVERNMENT CODE § 84308 APPLIES: YES
RECOMMENDATION:
1. That the City Council, by Motion, approve the professional services agreement, in the not-to-exceed amount of $180,000, with Dudek, for consultant services for the City of Anaheim Wildfire Evacuation Plan, and authorize and direct the Public Works Director, or designee to execute the Agreement, and take any and all actions as are necessary, required or advisable to implement and administer the Agreement; and,
2. Increase the Public Works Department’ s FY 2024/ 25 revenue and expenditure budgets in the Restricted Transportation Grant funds by $90,000.
BACKGROUND:
The easternmost part of the City of Anaheim, commonly referred to as Anaheim Hills, is an At-Risk community. CAL FIRE has designated a majority of this part of the City as a Very High Fire Hazard Severity Zone within a Local Responsibility Area. The location of Anaheim Hills in the wildland-urban interface within the Santa Ana Mountain foothills makes wildfires a significant threat to the area.
Given the history of wildfires in the area, the future development of the region, and changes in State legislation around evacuation preparedness, the City is looking to create a comprehensive Wildfire Evacuation Plan for Anaheim Hills. The plan is consistent with recently approved State legislative bills for cities to identify and evaluate evacuation routes in very high fire hazard zones. Additionally, the plan will help the City comply with recent updates to the California Environmental Quality Act ( CEQA) when determining the impacts of projects in wildfire prone areas.
In March 2024, the City of Anaheim applied for a grant from the California Fire Safe Council ( CSFC) USDA State Fire Capacity Grant Program to create a wildfire evacuation plan for the City of Anaheim. The grant is funded by the US Forest Service through the CSFC. In September 2024, the CSFC awarded a $ 90,000 grant for the City to develop a wildfire evacuation plan (Plan), with a $90,000 local match.
DISCUSSION:
Consultant Services Agreement with Dudek for the City of Anaheim Wildfire Evacuation Plan March 25, 2025