Cities Index.
Agenda packet, regular meeting, third session

Angels Camp City Council
June 20, 2023

Document
Agenda packet, regular meeting, third session
Meeting
June 20, 2023
Body
Angels Camp City Council
Original file
9.6 MB
Text extracted from the city's file for reading and search. Open the original on angelscamp.gov. That file is the official record.

W
CITY O
ATER M
J
F ANG
ASTER

July 2013
GELS
R PLAN

W

12 (209
CITY O

WATER M
J
Su
City
584 Sou
Angels C
Pr
Nolte A
(a NV5
215 West Ce
Mante
9) 239-9080
OF ANG
MASTER

July 2013
bmitted to:
y of Angels
uth Main Str
Camp, CA 95
repared by:

Associates, I
, Inc. compa
enter Street,
eca, CA 953
▪ (209) 239
GELS
R PLAN
reet
5222
Inc.
any)
Suite 201
337
9-4166 (Fax)

Angels WM
July 2013
Exec
A Water
treatment
future gro
Plan) [1]
water sup
supply, tr
on the cu
of influen
annexatio
Plan incl

1. A
d

2. S
pr

3. A

4. D

5. A
ac

6. A
w

7. A
id
sy

8. T
is
im

9. A
te
A phased
performa
within th
descendin
MP
cutive S
Master Plan
t, distributio
owth as defi
. The Master
pplies; and a
reatment, dis
urrent City li
nce (SOI) be
on will be th
uded:

A review of p
istribution, a
ite visits to t
ractices.

A review of t
Development
An analysis o
ctual usage t
An evaluation
water demand
An evaluation
dentification
ystem reliab
The execution
ssues within
mprovement
A prioritizatio
erm and long
d CIP was de
ance, distribu
he treatment,
ng order of i
Summ
n (Master Pla
on, and storag
ined in the re
r Plan includ
an identificat
stribution, an
imits from th
eyond the Ci
he subject of
previous repo
and storage s
the existing
he current an
t of design cr
of existing w
to develop p
n of water tr
ds.
n of availabl
n of alternate
ility.
n of hydraul
the distribut
ts on system
on of recomm
g-term capita
eveloped bas
ution system
supply, and
importance:
mary
an) was prep
ge systems t
ecently adop
des an evalu
tion of recom
nd storage sy
he General P
ity limits. W
f future techn
orts and stud
systems.
facilities and
nd future reg
riteria.
water demand
rojected wat
eatment, sto
le water supp
water suppl
ic model sce
tion system w
performanc
mended imp
al improvem
sed on a revi
m hydraulic c
d storage CIP
ES-1
n:\m
pared for the
to ensure the
pted City of A
ation of exis
mmended im
ystems. The
Plan [1] and d
Water supply
nical studies
dies complet
d a review o
gulatory requ
ds and calibr
ter demands
rage, and tra
plies under a
lies to help m
enarios to id
while assess
e.
provements i
ment plan (CI
iew of applic
capacity, and
P were priori
mtb020401\docume
e City of Ang
e City has ad
Angels 2020
sting facilitie
mprovement p
study area f
does not inc
and delivery
. Tasks comp
ted for the w
of available d
uirements re
ration of a w
.
ansmission f
a range of de
meet future d
dentify existin
sing the impa
in support of
IP).
cable regula
d projected w
itized based
ents\_water master
gels (City) w
dequate facil
0 General Pl
es; an assess
projects for
for the Mast
clude areas w
y for areas re
mpleted as par
water supply,
drawings and
elated to wat
water demand
facilities und
elivery cond
demands and
ng and build
acts of poten
f the develop
ations, treatm
water deman
on the follo
MTB0
r plan\final\0713 m
water supply
lities to supp
an (General
sment of alte
the water
er Plan is ba
within the sph
equiring
rt of the Ma
, treatment,
d operationa
ter supply.
d factor base
der projected
itions and
d improve
dout capacity
ntial
pment of a sh
ment plant
ds. Projects
wing, in
020401
mp.docx
,
port
ernate
ased
here
ster
al
ed on
d
y
hort-
City of Angels
Water Master Plan
Executive Summary
Angels WMP ES-2 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx

1. Addressing regulatory concerns (Phase 1A)

2. Improving reliability by providing operational redundancy (Phase 1B)

3. Replacing aging infrastructure (Phase 1C)

4. Providing capacity for future development (Phase 2A) The distribution system CIP was prioritized based on the following, in descending order of importance:

1. Providing required fire flow for existing demands (Phase 1A)

2. Meeting hydraulic performance criteria for existing demands (Phase 1B)

3. Providing required fire flow for future (buildout) demands (Phase 2A)

4. Meeting hydraulic performance criteria for future (buildout) demands (Phase 2B) The total CIP cost is approximately $24.3 million, with an average annualized cost of $1.22 million. Comparing the projected CIP costs to recent City budgets (e.g., FY 2011-12 CIP budget for water of $260,000) indicates that additional revenues will be needed to adequately fund the recommended CIP projects. Included as recommended CIP projects are water rate and connection fee studies to better assist with determining appropriate project financing.

Angels WM
July 2013
Executiv
Chapter

1.1 1.2
Chapter 2

2.1 2.2
a.
b

2.3 2.4
a.
b
c.

2.5 2.6
a.
b
c.

2.7 2.8
Chapter 3

3.1 3.2

3.3 Chapter 4

4.1 4.2

4.3 4.4
Chapter 5

5.1 5.2
a.
b

5.3 a.
b
c.

MP
ve Summary
1 Introduc
Backgrou
Scope of M
2 Summar
Agreemen
Previous W
. Distributi
. Water Tre
Municipa
Memoran
. Postpone
. Storage T
. Sediment
Angels Ca
Flow Met
. Account f
. Replace M
. Account f
Water Tre
List of W
3 Descript
Raw Wate
Water Tre
Distributi
4 Applicab
Source Ca
Treatmen
Storage C
Distributi
5 Existing
Study Are
Land Use
. Existing A
. Future Ar
Analysis o
. Water Pro
. 2012 Wat
. Metered W
...................
tion ............
und and Purp
Master Plan
ry of Previou
nt for Irrigat
Water Maste
ion System P
eatment Plan
al Service Re
ndum on Con
Fourth Filte
Tank at Powd
ation Basin
amp Water A
ter Report –
for Water Us
Meter at the
for Age of D
eatment Faci
Water Service
tion of Existi
er Delivery
eatment Plan
ion System .
ble Regulatio
apacity .......
nt Plant ........

Capacity ......
ion System .
and Projecte
ea ...............
e ..................

Areas ..........
reas .............
of Existing W
oduction .....
ter Productio
Water Usage
CO
....................
....................
pose .............
n ...................
us Reports....
tion Water fo
er Plan – 200
Projects........
nt Projects ...
eview – 2009
ntinuance of
er Cell ..........
der House H
....................

Audit – 2011
2012 ...........
sed at the W
Storage Tan
Distribution S
ilities Opera
s or Mains t
ing Water Sy
System ........
nt .................
....................
ons and Des
....................
....................
....................
....................
ed Water De
....................
....................
....................
....................

Water Dema
....................
on Trends ....
e ..................

TC-1
n:\m

ONTENTS
....................
....................
....................
....................
....................
or Greenhorn

02................
....................
....................
9 ..................
f 2002 Water
....................

Hill ................
....................
1 ..................
....................

Water Treatme
nk .................

System and M
ations Plan –
o be Replace
ystem ..........
....................
....................
....................
ign Criteria.
....................
....................
....................
....................
emands ........
....................
....................
....................
....................
ands .............
....................
....................
....................
mtb020401\docume
....................
....................
....................
....................
....................
n Creek Gol
....................
....................
....................
....................
r Master Plan
....................
....................
....................
....................
....................
ent Plant .....
....................

Meters ........
– 2012 ..........
ed ................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ents\_water master
....................
....................
....................
....................
....................
lf Course – 1
....................
....................
....................
....................
n – 2011 .....
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................

MTB0
r plan\final\0713 m
....................
....................
....................
....................
....................
1998 ............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
020401
mp.docx
Page
.ES-1
...1–1
.. 1–1
.. 1–2
...2–1
.. 2–1
.. 2–1
.. 2–1
.. 2–2
.. 2–3
.. 2–3
.. 2–3
.. 2–3
.. 2–3
.. 2–4
.. 2–8
.. 2–8
.. 2–8
.. 2–8
.. 2–8
.. 2–9
...3–1
.. 3–1
.. 3–1
.. 3–3
...4–1
.. 4–1
.. 4–1
.. 4–2
.. 4–3
... 5-1
... 5-1
... 5-1
... 5-2
... 5-5
... 5-7
... 5-7
... 5-8
... 5-9
Angels WM
July 2013
d
e.
f.

5.4 a.
b

5.5 a.
b
c.
d

5.6 a.
b
c.
d

5.7 Chapter 6

6.1 6.2
a.
b
c.
d
e.
f.
g
h
i.

6.3 6.4

6.5 a.
b
c.
d

6.6 a.
b

6.7 a.
b
c.

6.8 a.

MP
. Non-Reve
. Per Capita
Greenhorn
Peaking F
. Maximum
. Peak Hou
Developm
. Summary
. Calculatio
. Comparis
. Review o
Projection
. Base Yea
. Projected
. Projection
. Projection
Conclusio
6 Current a
Overview
History of
. Union Wa
. Utica Gol
. Union Pu
. Pacific Ga
. Calaveras
Northern
. City of An
. Utica Pow
Water Sup
Creek Sys
Water Sup
Available
Alternate
. Groundw
. Abandone
. Reduction
. Recycled
Overview
. Estimates
. Comparis
Options fo
. Option 1 –
. Option 2 –
. Option 3 –
Planning
. Emergenc
enue Water .
a Water Dem
n Creek Gol
Factors ........
m Day Dema
ur Demand ..
ment of Wate
y of Equivale
on of Water
son of Estim
f Recommen
n of Future W
r .................

Growth .....
n of 10-Year
n of Water D
ons ..............
and Future W
w ..................
f Water Sup
ater Compan
ld Mining Co
blic Utility D
as & Electric
s County Wa
California P
ngels ..........
wer Authorit
pply within
stem ...........
pply Agreem
e Surface Wa
Water Supp
ater ............
ed Mines ....
n in Surface
Water for N
w of City Wa
s of Future D
son of Availa
for Meeting F
– Obtain Inc
– Supplemen
– Enhanced
for Drought
cy Use of M
....................
mands ..........
lf Course Irr
....................
and ...............
....................
er Demand F
ent Water Un
Demand Fac
ated Versus
nded Water
Water Dema
....................
....................
r, 20-Year, a
Demands Inc
....................

Water Suppli
....................
ply Develop
ny ................
ompany .......

District ........
c ..................
ater District .

Power Agenc
....................
ty .................
the North Fo
....................
ments ...........
ater Supplies
plies .............
....................
....................

Water Diver
Non-potable
ater Demand
Demands ......
able Supply
Future Dema
creased Allo
nt with Grou
Use of Non
Years .........
ines .............

TC-2
n:\m
....................
....................
igation Dem
....................
....................
....................

Factor ..........
nit Conversi
ctor .............

Actual Resi
Demand Fac
ands .............
....................
....................
and Buildout
cluding Gree
....................
ies ...............
....................
pment ...........
....................
....................
....................
....................
....................
cy ................
....................
....................
ork of the St
....................
....................
s ..................
....................
....................
....................
rsions to Gre
Demands ....
s and Water
....................
vs. Projecte
ands ............
cations from
undwater .....
-potable Wa
....................
....................
mtb020401\docume
....................
....................
mands ...........
....................
....................
....................
....................
ion Factors ..
....................
idential Wat
ctor .............
....................
....................
....................
t Water Dem
enhorn Creek
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
tanislaus Riv
....................
....................
....................
....................
....................
....................
eenhorn Cre
....................
r Supply .......
....................
d Demands .
....................
m UPA .........
....................
ater ..............
....................
....................
ents\_water master
....................
....................
....................
....................
....................
....................
....................
....................
....................
er Demands
....................
....................
....................
....................
mands ...........
k Golf Cours
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ver, Mill Cre
....................
....................
....................
....................
....................
....................
eek Golf Cou
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................

MTB0
r plan\final\0713 m
....................
....................
....................
....................
....................
....................
....................
....................
....................
s ...................
....................
....................
....................
....................
....................
se ................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
eek, Angels
....................
....................
....................
....................
....................
....................
urse .............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
020401
mp.docx
. 5-11
. 5-12
. 5-13
. 5-14
. 5-14
. 5-15
. 5-15
. 5-15
. 5-17
. 5-19
. 5-19
. 5-20
. 5-20
. 5-20
. 5-20
. 5-21
. 5-22
... 6-1
... 6-1
... 6-1
... 6-1
... 6-2
... 6-3
... 6-3
... 6-3
... 6-4
... 6-5
... 6-5
... 6-6
... 6-6
... 6-8
... 6-8
... 6-9
. 6-12
. 6-12
. 6-13
. 6-13
. 6-14
. 6-16
. 6-18
. 6-18
. 6-19
. 6-20
. 6-20
. 6-20
Angels WM
July 2013
b

6.9 a.
b
Chapter 7

7.1 7.2
a.
b
c.
d
e.
f.
g

7.3 Chapter 8

8.1 8.2

8.3 8.4
a.
b
c.

8.5 a.
b

8.6 8.7
a.
b
Chapter 9

9.1 9.2

9.3 9.4

9.5 9.6
Chapter

10.1 10.2

10.3 10.4

10.5 MP
. Water Co
Alternate
. Evaluatio
. Prelimina
7 Water Tr
Current an
Evaluatio
. Coagulati
. Sediment
. Filtration
. Disinfecti
. Treated W
Transmiss
. Backwash
Conclusio
8 Hydrauli
Study Are
Summary
Existing D
Hydraulic
. Modeling
. Physical D
. Demand I
Calibratio
. Typical F
. Applied F
Scenarios
Distributi
. Average D
. Fire Flow
9 Recomm
Recomme
Water Tre
Distributi
Recomme
Meter Sys
Additiona
10 Probable
Construct
Project Co
Project Co
Project Co
Project Co
onservation (
Future Wate
n of Water S
ary Recomm
reatment Pla
nd Projected
n of Facilitie
ion and Floc
ation ..........
...................
ion ..............

Water Storag
sion ............
h Water and
ons and Reco
ic Evaluation
ea and Existi
y of Water D
Distribution
c Model ......
g Software...

Data ...........

Inputs .........
on of the Hyd
Friction Coef
Friction Coef
s Analyzed w
ion System P
Day, Maxim
w Analysis (E
mended Impr
ended Water
eatment Plan
ion System R
ended Water
stem Upgrad
al Recomme
e Project Cos
tion Cost Ac
osts for Wat
osts for Wat
osts for Dist
osts for Stor
(Drought Co
er Supply St
Supply Strat
endation .....
ant Evaluatio
d Treated Wa
es ................
cculation ......
....................
....................
....................
ge .................
....................

Sludge Han
ommendatio
n of Existing
ing Land Us
Demands by L
System .......
....................
....................
....................
....................
draulic Mod
fficients .......
fficients for
with Hydraul
Performance
mum Day, an
Existing) ......
rovements ....
r Supply Imp
nt Recomme
Recommend
r Storage Im
de and Leak
nded Project
sts ...............
ccuracy ........
ter Supply Im
ter Treatmen
tribution Sys
rage Improve
TC-3
n:\m
ntingency P
trategies ......
egies ...........
....................
on ................
ater Demand
....................
....................
....................
....................
....................
....................
....................
ndling ...........
ons ...............
g Distributio
se .................

Land Use Ty
....................
....................
....................
....................
....................
del ................
....................

Model Calib
lic Model ....
e under Exist
d Peak Hour
....................
....................
provements .
ended Improv
ed Improvem
mprovements
Detection S
ts .................
....................
....................
mprovement
nt Plant Impr
stem Improv
ements ........
mtb020401\docume
lans) ...........
....................
....................
....................
....................
ds ................
....................
....................
....................
....................
....................
....................
....................
....................
....................
on System ....
....................
ype ..............
....................
....................
....................
....................
....................
....................
....................
bration ........
....................
ting Conditio
r Demands (
....................
....................
....................
vements ......
ments ..........
...................

Survey ..........
....................
....................
....................
ts .................
rovements ...
vements .......
....................
ents\_water master
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
ons ..............
(Existing) ....
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................

MTB0
r plan\final\0713 m
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
020401
mp.docx
. 6-21
. 6-22
. 6-23
. 6-26
... 7-1
... 7-1
... 7-3
... 7-3
... 7-4
... 7-5
... 7-6
... 7-7
... 7-8
... 7-9
. 7-10
... 8-1
... 8-1
... 8-4
... 8-4
... 8-5
... 8-5
... 8-5
... 8-5
... 8-7
... 8-7
... 8-7
. 8-10
. 8-12
. 8-13
. 8-15
... 9-1
... 9-1
... 9-3
... 9-4
... 9-8
. 9-10
. 9-11
. 10-1
. 10-1
. 10-1
. 10-2
. 10-3
. 10-5
Angels WM
July 2013

10.6 10.7
Chapter

11.1 Chapter
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
MP
Project Co
Project Co
11 Capital I
Project Co
12 Referenc
x A Devel
x B Base Y
x C Projec
x D Utica
x E Amen
1999 –
x F Select
Augus
x G Initial
x H Projec
x I Fire H
x J Hydra
osts for Met
osts for Mas
Improvemen
osts ............
ces ..............
lopment of U
Year (2011)
cted Water D
Power Auth
nded Attachm
– 2012
t Pages from
st 1995; and
l Hydrogeolo
cted Water D
Hydrant Flow
aulic Model
ter System U
ster Plan and
nt Plan ..........
....................
....................

APP
Unit Convers
Water Dem
Demand Calc
hority Major
ment A, Wat
m the Asset S
d the Assignm
ogical Invest
Demands for
w Test Repor
Output – W
TC-4
n:\m
Upgrade and
d Rate Study
....................
....................
....................

PENDICES
sion Factors
mand Calcula
culations
Facilities an
ter Allotmen
Sale Agreem
ment and As
tigation
r WTP Evalu
rts
ater Distribu
mtb020401\docume
Leak Detect
y ...................
....................
....................
....................

S
from City W
ations
nd Related P
nt Tables, an
ment By and B
ssumption A
uation
ution System
ents\_water master
tion Survey .
....................
....................
....................
....................

Wastewater M
Projects
nd May 1st F
Between PG
Agreement, M
m
MTB0
r plan\final\0713 m
....................
....................
....................
....................
....................

Master Plan
Forecasts from
G&E and CC
May 1997
020401
mp.docx
. 10-6
. 10-8
. 11-1
. 11-1
. 12-1
m
CWD,
Angels WMP TC-5 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx

LIST OF TABLES
Table 2-1 City of Angels Water Master Plan Summary of Recommended Projects in the 2011 Water Audit .................................................................................................... 2–5 Table 4-1 City of Angels Water Master Plan Fire Flow Requirements ................................... 4–3 Table 4-2 City of Angels Water Master Plan Distribution System Evaluation and Design Criteria ........................................................................................................ 4–4 Table 5-1 City of Angels Water Master Plan Land Use Descriptions ...................................... 5-2 Table 5-2 City of Angels Water Master Plan Summary of Existing Land Uses ...................... 5-3 Table 5-3 City of Angels Water Master Plan Summary of Buildout Land Uses ...................... 5-5 Table 5-4 City of Angels Water Master Plan Historical Monthly Water Production, Water Treatment Plant, 2007-2012 .......................................................................... 5-8 Table 5-5 City of Angels Water Master Plan 2012 Monthly Water Production, Water Treatment Plant, January-July .................................................................................. 5-9 Table 5-6 City of Angels Water Master Plan Metered Water Service Connections by User Type for 2011 ................................................................................................ 5-10 Table 5-7 City of Angels Water Master Plan Historical Meted Water Usage by User Type, 2007-2011 .................................................................................................... 5-11 Table 5-8 City of Angels Water Master Plan Non-Revenue Water, 2007-2011 .................... 5-12 Table 5-9 City of Angels Water Master Plan Existing Per Capita Water Demand ................ 5-12 Table 5-10 City of Angels Water Master Plan Historical Surface Water Deliveries for Irrigation of GHC Golf Course, 2009-2011 ........................................................... 5-13 Table 5-11 City of Angels Water Master Plan Maximum Day Production Peaking Factors, 2007-2010 ................................................................................................. 5-14 Table 5-12 City of Angels Water Master Plan Summary of EWU Conversion Factors .......... 5-16 Table 5-13 City of Angels Water Master Plan Calculation of Water Demand Factor ............. 5-18 Table 5-14 City of Angels Water Master Plan Comparison of Estimated Versus Actual Residential Water Demands ................................................................................... 5-19 Table 5-15 City of Angels Water Master Plan Projected Population, Development, and Water Demands ...................................................................................................... 5-21 Table 5-16 City of Angels Water Master Plan Water Demand Projections Including GHC Golf Course Surface Water Irrigation Demands........................................... 5-22 Table 6-1 City of Angels Water Master Plan Current and Projected Water Demands ........... 6-14 Table 6-2 City of Angels Water Master Plan 2007-2012 Historical Monthly Percentage of Annual Treated Water Production .................................................................... 6-15 Table 6-3 City of Angels Water Master Plan Estimate of Non-Potable Demands for City ......................................................................................................................... 6-16 Angels WMP TC-6 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx Table 6-4 City of Angels Water Master Plan Potable and Non-Potable Projected Water Demands ................................................................................................................. 6-16 Table 6-5 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections GHC Golf Course Surface Water Irrigation Demands ......... 6-17 Table 6-6 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections Assuming only City Potable Water Demands and GHC Golf Course Surface Water Irrigation Demands .................................................... 6-17 Table 6-7 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections Excluding GHC Golf Course Surface Water Irrigation Demands ................................................................................................................. 6-18 Table 6-8 City of Angels Water Master Plan Comparison of Water Supply versus Demand Projections Excluding Non-potable Water Demands .............................. 6-18 Table 6-9 City of Angels Water Master Plan Water Shortage Stages and Water Use Reduction Goals ..................................................................................................... 6-22 Table 6-10 City of Angels Water Master Plan Summary of Future Alternate Water Supply Strategies .................................................................................................... 6-23 Table 6-11 City of Angels Water Master Plan Evaluation Criteria for Alternate Water Supply Strategies .................................................................................................... 6-24 Table 6-12 City of Angels Water Master Plan Evaluation Matrix for Alternate Water Supply Strategies .................................................................................................... 6-25 Table 6-13 City of Angels Water Master Plan Summary of Possible “Blend” of Alternative Water Supply Sources to Meet Buildout Water Demand of 2,655 AFY ........................................................................................................................ 6-26 Table 7-1 City of Angels Water Master Plan Current and Projected Water Demands for WTP Evaluation ....................................................................................................... 7-3 Table 7-2 City of Angels Water Master Plan WTP Flocculation Basin Hydraulic Loading Summary .................................................................................................... 7-4 Table 7-3 City of Angels Water Master Plan WTP Sedimentation Basin Hydraulic Loading Summary .................................................................................................... 7-4 Table 7-4 City of Angels Water Master Plan WTP Filtration System Capacity ...................... 7-6 Table 7-5 City of Angels Water Master Plan System Storage Requirements for California Waterworks Standards ............................................................................ 7-7 Table 7-6 City of Angels Water Master Plan System Storage Requirements for City Improvement Standards............................................................................................ 7-8 Table 7-7 City of Angels Water Master Plan Sizing of Parallel Water Transmission Main ......................................................................................................................... 7-9 Table 8-1 City of Angels Water Master Plan Developed Land Use Summary ........................ 8-3 Table 8-2 City of Angels Water Master Plan Summary of Water Demands By Land Use ...... 8-4 Angels WMP TC-7 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx Table 8-3 City of Angels Water Master Plan Pipeline Materials and Friction Coefficients .............................................................................................................. 8-7 Table 8-4 City of Angels Water Master Plan Fire Hydrant Flow Test and Model Calibration Data ....................................................................................................... 8-8 Table 8-5 City of Angels Water Master Plan Applied Friction Coefficients ......................... 8-10 Table 8-6 City of Angels Water Master Plan Executed Hydraulic Model Scenarios ............. 8-11 Table 8-7 City of Angels Water Master Plan Fire Flow Requirements .................................. 8-12 Table 8-8 City of Angels Water Master Plan Distribution System Hydraulic Performance Criteria .............................................................................................. 8-12 Table 8-9 City of Angels Water Master Plan Hydraulically Deficient Junctions and Pipe Segments, Existing Conditions .............................................................................. 8-13 Table 8-10 City of Angels Water Master Plan Hydraulically Deficient Fire Hydrants, Existing Conditions ................................................................................................ 8-15 Table 9-1 City of Angels Water Master Plan Hydraulic Summary of Supply Route Alternatives .............................................................................................................. 9-1 Table 9-2 City of Angels Water Master Plan Assessment of Well Site/Supply Pipeline Alternatives .............................................................................................................. 9-3 Table 9-3 City of Angels Water Master Plan Recommended Water Treatment Plant ImProvements........................................................................................................... 9-4 Table 9-4 City of Angels Water Master Plan Distribution System Hydraulic Performance Criteria ................................................................................................ 9-5 Table 9-5 City of Angels Water Master Plan Recommended Distribution Main Improvements ........................................................................................................... 9-6 Table 9-6 City of Angels Water Master Plan Storage Tank Site Alternatives ......................... 9-8 Table 9-7 City of Angels Water Master Plan Assessment of Storage Tank Site Alternatives ............................................................................................................ 9-10 Table 10-1 City of Angels Water Master Plan Unit Costs for Water Supply Improvements ......................................................................................................... 10-1 Table 10-2 City of Angels Water Master Plan Project Costs for Water Supply Improvements ......................................................................................................... 10-2 Table 10-3 City of Angels Water Master Plan Project Costs for Water Treatment Plant Improvements ......................................................................................................... 10-3 Table 10-4 City of Angels Water Master Plan Unit Costs for Distribution System Improvements ......................................................................................................... 10-3 Table 10-5 City of Angels Water Master Plan Project Costs for Distribution System Improvements ......................................................................................................... 10-4 Table 10-6 City of Angels Water Master Plan Unit Costs for Storage Improvements ............. 10-6 Angels WMP TC-8 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx Table 10-7 City of Angels Water Master Plan Project Costs for Recommended Storage Tank Site Alternative ............................................................................................. 10-6 Table 10-8 City of Angels Water Master Plan Project Costs for Meter System Upgrade ........ 10-7 Table 10-9 City of Angels Water Master Plan Project Costs for Leak Detection Survey ........ 10-7 Table 10-10 City of Angels Water Master Plan Project Costs for Master Plan and Rate Study ...................................................................................................................... 10-8 Table 11-1 City of Angels Water Master Plan Capital Improvement Projects for Treatment, Storage, and Supply Systems ............................................................... 11-2 Table 11-2 City of Angels Water Master Plan Capital Improvement Projects for Distribution System ................................................................................................ 11-3 Table 11-3 City of Angels Water Master Plan 20-Year Capital Improvement Plan ................ 11-5 Table 11-4 City of Angels Water Master Plan Summary of Capital Improvement Plan Costs ....................................................................................................................... 11-7

LIST OF FIGURES
Figure 3-1 Existing Water System .............................................................................................3–2 Figure 5-1 Existing Developed Land Uses ................................................................................ 5-4 Figure 5-2 Buildout Land Uses .................................................................................................. 5-6 Figure 6-1 Potential Well Sites ................................................................................................ 6-11 Figure 7-1 WTP Flow Diagram - Existing................................................................................. 7-2 Figure 7-2 WTP Flow Diagram - Proposed ............................................................................. 7-11 Figure 8-1 Distribution System Pressure Zones ........................................................................ 8-2 Figure 8-2 Distribution System Trunk Network ........................................................................ 8-6 Figure 8-3 Hydrant Test Locations ............................................................................................ 8-9 Figure 8-4 Distribution System Model Results ....................................................................... 8-14 Figure 8-5 Fire Flow Analysis Results .................................................................................... 8-16 Figure 9-1 Well Site and Supply Pipeline Route Alternatives .................................................. 9-2 Figure 9-2 Recommended Distribution Main Improvements .................................................... 9-7 Figure 9-3 Storage Tank Site Alternatives ................................................................................. 9-9 Angels WMP TC-9 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx

LIST OF ABBREVIATIONS
The following abbreviations are used in this report:

AACE Associated Advancement of Cost Engineering
ac Acre
ADD Average Day Demand
AF Acre-Feet
AFY Acre-Feet per Year
AMR Automatic Meter Reading
ARV Air Release Valve
AWWA American Water Works Association
BAE Business Attraction/Expansion
Cal ISO California Independent System Operator
CC Community Commercial
CCWC Calaveras County Water Company
CCWD Calaveras County Water District
CDPH California Department of Public Health
cfs Cubic Feet Per Second
CIP Capital Improvement Plan
CWUA Calaveras Water Users Association
DE Dunn Environmental
DWR Department of Water Resources
EA Each
ENR Engineering News Record
EPA United States Environmental Protection Agency
EWU Equivalent Water Unit
FERC Federal Energy Regulatory Commission
fps Feet per Second
ft Feet or Foot
ft2 Square Foot
GHC Greenhorn Creek
GIS Geographical Information Systems
gpcd Gallons per Capita per Day
gpd Gallons per Day
gpd/ac Gallons per Day per Acre
gpd/EWU Gallons per Day per Equivalent Water Unit
gpd/ft2 Gallons per Day per Square Foot
gpm Gallons per Minute
HC Historic Commercial
HDR High-Density Residential
HDR-WMC Worldmark Club
I Industrial
in Inch
IWA International Water Association
LF Lineal Feet or Lineal Foot
LIST OF ABBREVIATIONS (Cont.)
Angels WMP TC-10 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx LS Lump Sum
MDD Maximum Day Demand
MDR Medium-Density Residential
MW Megawatt
MG Million Gallons
mgd Million Gallons per Day
MSR Municipal Service Review
NCPA Northern California Power Agency
NPDES National Pollutant Discharge Elimination System
NTU Nephelometric Turbidity Unit
OS Open Space
P Public
PG&E Pacific Gas and Electric Company
PHD Peak Hour Demand
PR-Golf Golf Course
PR Parks and Recreation
PRV Pressure Reducing Valve
P-SCH Public School
PVC Polyvinyl Chloride
psi Pounds per Square Inch
RE Residential Estate
ROW Right-of-Way
rpm Revolutions per Minute
SC Shopping Commercial
SF-CCI San Francisco Construction Cost Index
SFR Single-Family Residential
SOI Sphere of Influence
SP Special Planning
SR State Route
SWRCB State Water Resources Control Board
TDH Total Dynamic Head
UGMC Utica Gold Mining Company
UPA Utica Power Authority
UPUD Union Public Utility District
USGS United States Geological Survey
UWC Union Water Company
WTP Water Treatment Plant
WWTP Wastewater Treatment Plant
Angels WMP TC-11 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx

CONVERSION FACTORS
Volume
1 AF = 43,560 ft3 = 325,851 gallons
1 ft3 = 7.48 gallons
1 million gallons = 3.07 AF
Flow Rate
1 cfs = 450 gpm = 646,320 gallons/day
1,000 gpm = 2.23 cfs = 4.42 AF/day
1 mgd = 1,120 AFY = 3.07 AF/day
1 cfs for 24 hours = 1.983 AF
1 cfs for 30 days = 59.5 AF
1 cfs for 1 year = 724 AF
Angels WM
July 2013
1 In
A Water
treatment
future gro
Plan) [1]
water sup
supply, tr
on the cu
of influen
annexatio
water ma

1.1 B
The City
Plan incl

1. A

2. P

3. A
d

4. A
m

5. A
an
re

6. C
fa
pr

7. A
d
in

8. Id
an
MP
troduc
Master Plan
t, distributio
owth as defi
. The Master
pplies; and a
reatment, dis
urrent City li
nce (SOI) be
on will be th
anagement an
Background
desires a co
udes the foll
A summary a
rojected wat
An evaluation
eficiencies w
An evaluation
maintenance,
An evaluation
nd secondary
equirements,
Cost estimate
acilities to en
rojections.

A short-term
eficiencies i
nclude establ
dentification
nd treatment
ction
n (Master Pla
on, and storag
ined in the re
r Plan includ
an identificat
stribution, an
imits from th
eyond the Ci
he subject of
nd tasks com
and Purpo
omprehensiv
lowing items
and descripti
ter demands
n of the exist
with mitigati
n of the exist
and mitigat
n of supplem
y long-term
, costs, and c
es for require
nsure adequa
and long-ter
ncluding pri
lishment of c
n of any pres
t facilities.
an) was prep
ge systems t
ecently adop
des an evalu
tion of recom
nd storage sy
he General P
ity limits. W
f future techn
mpleted as pa
se
ve Master Pla
s:
on of the wa
for the 10-y
ting water d
ion recomme
ting treatme
tion recomm
mental water
alternatives
constraints.
ed improvem
ate capacity
rm Capital Im
ioritization, a
connection f
ent and futu
1–1
n:\m
pared for the
to ensure the
pted City of A
ation of exis
mmended im
ystems. The
Plan [1] and d
Water supply
nical studies
art of the Ma
an prepared
ater system.
year and 20-y
istribution sy
endations tri
nt facilities,
mendations to
supply sour
with consid
ments to the d
for both sum
mprovement
alternatives
fees based on
ure regulatory
mtb020401\docume
e City of Ang
e City has ad
Angels 2020
sting facilitie
mprovement p
study area f
does not inc
and delivery
. Backgroun
aster Plan ar
for water fac
year plannin
ystem and id
iggered by d
identificatio
o optimize op
rces includin
deration for t
distribution
mmer and wi
t Plan (CIP)
analysis, and
n growth pro
y concerns f
ents\_water master
gels (City) w
dequate facil
0 General Pl
es; an assess
projects for
for the Mast
clude areas w
y for areas re
nd informatio
re presented
cilities. The
ng horizon.
dentification
demand proje
ons of defici
perations.
ng emergenc
treatment an
system and
inter demand
to address i
d schedules.
ojections.
for the distrib
MTB0
r plan\final\0713 m
water supply
lities to supp
an (General
sment of alte
the water
er Plan is ba
within the sph
equiring
on regarding
in this chap
required Ma
n of hydrauli
ections.
iencies with
y alternative
nd distributio
treatment
ds with grow
identified
. The CIP wi
bution system
020401
mp.docx
,
port
ernate
ased
here
g
ter.
aster
ic
es
on
wth
ill
m
Angels WM
July 2013

1.2 S
The follo

1. A
d

2. S
pr

3. A

4. D

5. A
ac

6. A
w

7. A
id
sy

8. T
is
im

9. A
sh
Each of t
MP
cope of Ma
owing tasks w
A review of p
istribution, a
ite visits to t
ractices.

A review of t
Development
An analysis o
ctual usage t
An evaluation
water demand
An evaluation
dentification
ystem reliab
The execution
ssues within
mprovement
A prioritizatio
hort-term an
these tasks is
ster Plan
were comple
previous repo
and storage s
the existing
he current an
t of design cr
of existing w
to develop p
n of water tr
ds.
n of availabl
n of alternate
ility.
n of hydraul
the distribut
ts on system
on of recomm
nd long-term
s summarize
eted as part o
orts and stud
systems.
facilities and
nd future reg
riteria.
water demand
rojected wat
eatment, sto
le water supp
water suppl
ic model sce
tion system w
performanc
mended imp
CIP.
ed in the foll
1–2
n:\m
of the Maste
dies complet
d a review o
gulatory requ
ds and calibr
ter demands
rage, and tra
plies under a
lies to help m
enarios to id
while assess
e.
provements i
owing chapt
mtb020401\docume
er Plan:
ted for the w
of available d
uirements re
ration of a w
.
ansmission f
a range of de
meet future d
dentify existin
sing the impa
in support of
ters.

Wa
Chapter
ents\_water master
water supply,
drawings and
elated to wat
water demand
facilities und
elivery cond
demands and
ng and build
acts of poten
f the develop
City of A
Water Master
r 1: Introdu
MTB0
r plan\final\0713 m
, treatment,
d operationa
ter supply.
d factor base
der projected
itions and
d improve
dout capacity
ntial
pment of a
ngels
Plan
uction
020401
mp.docx
al
ed on
d
y
Angels WM
July 2013
2Su
Previous
constrain
the Maste
projects w

2.1 A
The seco
Creek As
the Green
untreated
T
fo
(g
The agre
City’s wa
A
w
of
sh
su

2.2 P
The 2002
improvem
A numbe
plant (W
a. D
The follo
replacem
probabili

1. S
O

2. S

3. R
MP
ummar
reports prep
nts, and meth
er Plan. Rec
were integra
Agreement f
ond amended
ssociates L.P
nhorn Creek
d water from
The City shal
or the Projec
gpm) up to a
ement also s
astewater tre
At the time of
wastewater tr
f treated was
hall become
ufficient trea
Previous Wa
2 Water Mas
ments and as
er of projects
TP) as discu
Distribution S
owing five pr
ment of old w
ity of failure
tate Route (S
Office)
R-49 Pipelin
Raspberry La
ry of P
pared for the
hodologies u
ently compl
ated into the
for Irrigatio
d agreement
P. ensures th
k (GHC) Gol
m Angel’s Cr
ll make avail
ct’s golf cou
a maximum r
states that th
eatment plan
f installation
reatment fac
stewater as s
a secondary
ated wastewa
ater Master
ster Plan was
ssociated cos
s were sugge
ussed further
System Proje
rojects recom
welded steel m
:

SR) 49 Pipe
ne Replacem
ane Pipeline
reviou
e City are sum
used for analy
eted projects
Master Plan
on Water for
dated July 1
hat the City m
lf Course [2]
eek:
lable up to 4
rse irrigatio
rate of 1,400
e golf course
nt (WWTP) a
n and comme
cility, the golf
set forth her
y source of i
ater is not av
Plan – 2002
s prepared to
sts needed to
ested to impr
r below [3].
ects
mmended in
mains becau
line Replace
ment (from M
Replacemen
2–1
n:\m
us Repo
mmarized in
ysis in past r
s were noted
n as appropri
r Greenhor
998 between
maintains a r
]. The agreem
450 acre-feet
on at a minim
0 gpm.
e irrigation s
as follows:
encement of
lf course irri
rein. From th
rrigation, av
vailable.
2 o support gro
o meet future
rove the dist
n the 2002 W
use they were
ement (from
Museum to M
nt
mtb020401\docume
orts
n this chapter
reports were
d and recomm
iate.
rn Creek Go
n the City of
regular supp
ment states t
t (AF) of cre
mum flow of
system must
operation of
igation syste
hat time forw
vailable dur
owth in the C
e water dem
tribution sys
Water Master
e undersized
Stanislaus S
Mark Twain R
ents\_water master
r. Design cri
e considered
mended imp
olf Course –
f Angels and
ly of water f
the following
eek water fro
f 700 gallons
t use recycle
f the City’s s
em shall be c
ward, untrea
ing those tim
City and ide
mands throug
stem and the
Plan involv
d and/or had
Street to Alta
Road)
MTB0
r plan\final\0713 m
iteria,
in developin
provement
– 1998
d Greenhorn
for irrigation
g in regards
om Angel’s C
s per minute
ed water from
substantially
converted to
ated creek wa
mes when
ntify
gh the year 20
water treatm
ved the
a high
aville Post
020401
mp.docx
ng
n of
to
Creek
m the
y new
use
ater
015.
ment
Angels WM
July 2013

4. M

5. C
The follo
fire flow
system:

1. F

2. D

3. L
All pipel
Plan as o
Replacem
by privat
In additio
gallon (M
while the
basin. Th
b. W
The 2002
basin by
configura
installatio
sediment
would all
Due to th
addition
include a
water rec
The addi
the year 2
All impro
have yet
MP
Minna Street
Church Street
owing water
requirement
innegan Lan
Demarest-Mo
Lee Lane Wa
ine improve
outlined abov
ment (from S
te developme
on the constr
MG) capacity
e WTP is shu
his project re
Water Treatm
2 Water Mas
installing a m
ation, the sed
on of a mech
tation basin p
low for high
he lack of slu
of two sludg
access ramps
covery system
tion of a fou
2014.
ovements to
to be initiate
Pipeline Re
t Pipeline Re
main extens
ts, and incre
ne to Centen
onte Verde S
ater Pipeline
ments to the
ve have been
Stanislaus St
ent.
ruction of a
y was sugges
ut down for b
emains incom
ment Plant Pr
ster Plan sug
mechanical
dimentation
hanical sludg
possible. Ad
her overflow
udge process
ge dewaterin
s to allow rem
m, and recyc
urth filter cel
the WTP re
ed and are ad
placement
eplacement
sions were re
ease flows to
nnial Road Lo
Street Loop
e distribution
n completed
treet to Altav
second stora
sted to meet
backwashing
mplete and is
rojects
ggested that i
sludge colle
basin has to
ge collection
dding tube se
rates due to
sing capabili
ng basins to t
moval of dri
cle pumps.
ll was also re
ecommended
ddressed late
C
2–2
n:\m
ecommended
o accommoda
oop
n system reco
with the exc
ville Post Of
age tank at P
the maximu
g filters and
s addressed l
improvemen
ection system
o be drained
n system wou
ettlers to the
o the shallow
ities, the 200
the WTP. Th
ied sludge w
ecommended
d in the 2002
er in this Ma
Chapter 2: Su
mtb020401\docume
d to provide
ate new conn
ommended i
ception of th
ffice) which
Powder Hous
um day dema
removing sl
later in this
nts be made t
m and tube se
and hosed d
uld make co
outlet end o
w settling dep
02 Water Ma
he proposed
with mechani
d to increase
2 Water Mas
aster Plan.

Wa
ummary of P
ents\_water master
looped wate
nections to t
in the 2002 W
he SR-49 Pip
has been pa
se Hill with
and (MDD)
ludge from t
Master Plan
to the existin
ettlers. Unde
down to remo
ontinuous use
of the sedime
pth.
aster Plan pr
sludge dewa
ical equipme
e the capacit
ster Plan as o
City of A
Water Master
Previous Rep
MTB0
r plan\final\0713 m
er mains, me
the existing
Water Maste
peline
artially comp
a 2.0 million
on the syste
the sediment
n.
ng sediment
er the curren
ove sludge. T
e of the
entation basi
roposed the
atering basin
ent, a clarifie
ty of the WT
outlined abov
ngels
Plan
eports
020401
mp.docx
eet
er
pleted
n
em
tation
tation
nt
The
in
ns
ed
TP by
ve
Angels WM
July 2013

2.3 M
The Mun
facilities
The MSR
populatio

1. A
d

2. C
tr

3. F
The MSR
Authority
disrupted
In additio
mains tha

2.4 M
An intern
Water/W
Master P
a. P
It was su
included
b. S
The mem
instead b
for the w
the water
to supply
c. S
As recom
sediment
MP
Municipal Se
nicipal Servi
including th
R identified t
on growth:

Addition of a
ay (mgd).

Construction
reated water
inding addit
R mentioned
y (UPA) can
d the City’s w
on, the MSR
at have a hig
Memorandu
nal memoran
Wastewater T
Plan projects
ostpone Fou
uggested that
in a new ma
torage Tank
morandum re
be constructe
water system
r supply. A s
y the City wi
edimentation
mmended in
tation basin b
ervice Revie
ce Review (
he water supp
the followin
a fourth filter
of an additio
each day.
tional water
d that the Cit
nal system fo
water supply
R stated that v
gh probabilit
m on Conti
ndum was pr
reatment wit
with the mo
urth Filter Ce
t the propose
aster plan.
k at Powder H
ecommended
ed on the site
and allow m
second pipel
ith water in t
n Basin
the 2002 Wa
be equipped
ew – 2009
MSR) provi
ply, treatmen
ng improvem
r at the WTP
onal 2.0 MG
supply sourc
ty’s water su
or water deli
y in the past.
various proj
ty of failure
inuance of 2
repared in Ja
th the recom
odifications l
ell
ed fourth filt
House Hill
d that the pro
e of the aban
maintenance
line from the
the event tha
ater Master P
d with a sludg
C
2–3
n:\m
des an asses
nt, distributi
ments based o
P to increase
G storage tan
ces to meet f
upply is solel
very. Proble
ects had bee
or are under
2002 Water
anuary 2011
mmendation t
listed below
ter cell proje
oposed stora
ndoned clearw
on the existi
e WTP to the
at the existin
Plan, it was
ge removal s
Chapter 2: Su
mtb020401\docume
ssment of the
ion, and stor
on previous
the capacity
nk to provide
future water
ly dependent
ems with the
en identified
rsized.

Master Pla
by the Senio
to complete
[5].
ect at the WT
age tank at Po
rwell at the W
ing storage t
e distribution
ng pipeline fa
suggested th
system to rem
Wa
ummary of P
ents\_water master
e City’s pub
rage systems
studies to su
y to 3.0 milli
e the City wi
r demands.
nt on the Utic
e canal have
to replace o
an – 2011
or Superviso
the existing
TP be postpo
owder Hous
WTP to prov
tank without
n system wa
fails.
hat the existi
move solids
City of A
Water Master
Previous Rep
MTB0
r plan\final\0713 m
lic services a
s [4].
upport projec
ion gallons p
ith 4.0 MG o
ca Power
severely
old welded st
or of
g 2002 Water
oned and
se Hill shoul
vide extra sto
t shutting do
as also sugge
ing
without
ngels
Plan
eports
020401
mp.docx
and
cted
per
of
teel
r
d
orage
wn
ested
Angels WM
July 2013
decanting
2002 Wa
capacity
it was su
existing s
storm eve

2.5 A
The 2011
complian
current a
four cate
4) Admin
are provi
MP
g. A sludge h
ater Master P
to handle slu
ggested to b
sedimentatio
ents, and to
Angels Camp
1 Angels Cam
nce with regu
nd future res
gories as fol
nistration an
ided in Table
handling fac
Plan but with
udge from b
egin plans fo
on basin with
prepare for f
p Water Au
mp Water A
ulations and
sidents of th
llows: 1) WT
nd Planning.
e 2-1 [6].
cility was als
h the clarific
oth the sedim
for a second
hout shutting
future growt
udit – 2011
Audit (2011 W
to develop p
e City. The p
TP; 2) Distri
A summary
C
2–4
n:\m
so recommen
ation that th
mentation ba
sedimentatio
g down the W
th.

Water Audit)
projects to e
proposed pro
ibution Syste
of the recom
Chapter 2: Su
mtb020401\docume
nded in the m
he facility ne
asin and the
on basin to a
WTP, to help
) was prepar
quip the wat
ojects in the
em; 3) Wate
mmended pr
Wa
ummary of P
ents\_water master
memorandum
eds to be de
filter backw
allow mainte
p reduce turb
red for the C
ter system fo
e 2011 Water
er Quality Sa
rojects with t
City of A
Water Master
Previous Rep
MTB0
r plan\final\0713 m
m as in the
signed with
wash. In addi
enance to the
bidity during
City to ensure
or the needs
r Audit fall i
ampling; and
the current s
ngels
Plan
eports
020401
mp.docx
the
ition,
e
g
e
of
into
d
status
City of Angels
Water Master Plan
Chapter 2: Summary of Previous Reports
Angels WMP 2–5 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 2-1

CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF RECOMMENDED PROJECTS IN THE 2011 WATER AUDIT Project
Number Project Description Rationale Status
WTP Projects
1 Construct Settling Ponds
and Discharge Backwash Water Properly
Construct settling ponds. Recycle backwash water through headworks, obtain discharge permit, or discharge to wastewater system.

Required for regulatory compliance. Backwash water is currently being discharged without a permit.

Incomplete. Addressed in this Master Plan.
2 Implement Redundancy
During Filter Backwash
Modify system so that at least one filter is on-line during backwashing.

Improves reliability. Allows water treatment to continue through backwash procedures, eliminating 2.75 hour shutdowns.

Incomplete. Addressed in this Master Plan.
3 Pursue Emergency
Alternative Water Supply
Pursue alternative options for providing emergency water supply in event that flume system is damaged.

Necessary to provide redundancy if flume system is compromised.

Incomplete. Addressed in this Master Plan.
4 Construct Second Storage
Tank
Construct a new 2.0 MG tank at one of three proposed locations.

Needed to meet future maximum day scenarios. Improve system reliability and security.

Incomplete. Addressed in this Master Plan.
5 Address Post-Storm
Turbidity Shutdowns
Option A: Investigate whether second sedimentation basin would prevent shutdowns. Option B: Investigate feasibility of prefiltration or other process to make high turbidity water usable.

Necessary to improve reliability after storms. If Option A is feasible, it would also improve redundancy.

Incomplete. Addressed in this Master Plan.
6 Add Fourth Filter Add fourth mixed-media filter to
provide additional capacity at WTP.

Provide additional redundancy. Needed to accommodate future growth.

Incomplete. Addressed in this Master Plan.

City of Angels
Water Master Plan
Chapter 2: Summary of Previous Reports
Angels WMP 2–6 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 2-1 (Cont.)

CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF RECOMMENDED PROJECTS IN THE 2011 WATER AUDIT Project
Number Project Description Rationale Status
Distribution System Projects
7 Complete an Inventory of
the Distribution System
Complete an inventory of all pipes, valves, and hydrants within the system and incorporate into geographical information systems (GIS).

Necessary to allow the City to make accurate decisions in planning and construction. Needed to create hydraulic model.

Completed as part of this Master Plan. See Chapter 8.
8 Develop a Hydraulic Pipe
Network Model
Develop a model of the system including the WTP, storage tank, and distribution system.

Can be used to analyze the system for compliance, make decisions, prioritize projects, and plan for future development.

Completed as part of this Master Plan. See Chapter 8.
9 Identify and Prioritize
Infrastructure Upgrades using Hydraulic Model
Use the results of the model to identify and prioritize infrastructure upgrades.

Hydraulic model provides a tool for assessing system needs.

Completed as part of this Master Plan. See Chapter 8.
10 Assess Distribution
System Compliance using Hydraulic Model
Use the results of the model to assess whether regulations are being met.

Provides a way for the City to demonstrate compliance with certain regulations.

Completed as part of this Master Plan. See Chapter 8.
11 Add Second Water Main
from WTP to City
Add 18-inch pipeline parallel to the existing pipeline.

Necessary for redundancy and reliability. The existing pipeline is old and a major system weakness.

Incomplete. Addressed in this Master Plan.
12 Loop Dead Ends and
Install Blowoff Assemblies
Where possible, loop dead ends. Otherwise install a blowoff assembly.

Will improve system reliability and water quality. Required for regulatory compliance.

Incomplete. Addressed in this Master Plan.

City of Angels
Water Master Plan
Chapter 2: Summary of Previous Reports
Angels WMP 2–7 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 2-1 (Cont.)

CITY OF ANGELS WATER MASTER PLAN
SUMMARY OF RECOMMENDED PROJECTS IN THE 2011 WATER AUDIT Project
Number Project Description Rationale Status
Water Quality Sampling Projects
13 Update Bacterial
Sampling Plan
Revise City’s Bacterial Sampling Plan by 2012 (last updated in 2002).

State regulations require a minimum number of samples per month based on number of connections. Because the number of connections in the distribution system has increased, a minimum of six samples per month is now required rather than the five samples per month required in the 2002 plan. Regulations also require the plan be updated every 10 years.

Completed.

Administration and Planning Projects
14 Develop City Planning
Criteria in Next Water Master Plan
Incorporate all related water codes into a list of criteria for future planning.

Useful planning tool for assessing criteria for future infrastructure and existing deficiencies.

Completed as part of this Master Plan. See Chapter 4.
15 Submit Permit
Amendment Following Major Upgrades at WTP
Submit application for a permit amendment following major improvements at the WTP.

Necessary for compliance with regulations. Will be submitted concurrent with completion of design activities.
16 Update Operations and
Maintenance Plan
Update the plan to reflect upgrades to the WTP.

Required by Water Supply Permit. Completed by City Engineer in May 2012.
17 Pursue Shortage Plan
with UPA
City should work with UPA to develop a plan to allocate water to all users during a drought.

Essential to securing a reliable water supply and the ability to meet maximum day scenarios at all times.

Ongoing.
18 Develop an Alternative
Supply for GHC Development
Explore options for alternative supplies for GHC.

Necessary to ensure that the entire water supply allocation from UPA is available for the City.

Ongoing.
19 Staffing Level
Recommendation
Hire one full-time and one part-time staff member.

Current staffing levels are below other comparable water purveyors by approximately 20 percent.

Under consideration.

Angels WM
July 2013

2.6 F
A flow m
the distri
between
a. A
There are
differenc
(custome

1. P

2. P
Accounti
water me
analyses
b. R
There are
storage ta
year old m
for water
c. A
The flow
aging pip

1. B

2. R
m
el
The leak
system ar

2.7 W
The Wate
on the op
following
MP
Flow Meter R
meter report w
bution syste
water produ
Account for W
e two uses o
ce between w
er meters):
rocess water
rocess water
ing for the p
etered from 2
of unit capa
Replace Mete
e a number o
ank (aka, the
meter to incr
r in the syste
Account for A
w meter repor
pes and custo
Budget for le
Replace all ol
meters are wo
lectronic me
detection w
re incorpora
Water Treat
er Treatmen
peration of th
g:

Report – 20
was prepared
em [7]. Reco
uced and wat
Water Used
f process wa
water produc
r for filter ba
r for sodium
rocess water
20 percent to
acities at the
er at the Stor
of concerns w
e “town mete
rease the acc
em. Replacem
Age of Distr
rt presented
omer meters
ak checks by
ld meters an
orn, accuracy
eter reading s
work, replace
ated into the
tment Facili
nt Facilities O
he City WTP
012
d in April 20
mmendation
ter metered a
at the Water
ater at the W
ced (from the
ackwash.
m hypochlorit
r brings the a
o 12 percent
WTP is add
rage Tank
with the age
er”). The flo
curacy of me
ment of the m
ibution Syst
two recomm
:
y a leak dete
nd upgrade to
y is problem
system will i
ment of old
recommende
ities Operat
Operations P
P [8]. The Op
C
2–8
n:\m
012 to addre
ns that were
are discussed
r Treatment P
WTP that shou
e combined f
te generation
average diffe
. The critica
dressed in Ch
and calibrat
ow meter rep
easurements
meter is anti
tem and Met
mendations f
ection contra
o an electron
matic contribu
improve acc
meters, and
ed projects i
tions Plan –
Plan (Operati
perations Pl
Chapter 2: Su
mtb020401\docume
ess concerns
brought forw
d below.

Plant
uld be accou
filter effluen
n.
ference betw
ality of includ
hapter 7.
tion of the m
port recomm
s which may
icipated in 20
ters
for accountin
actor.
nic meter rea
uting to pote
curacy and re
upgrade to e
in Chapter 9
– 2012
ions Plan) pr
an includes
Wa
ummary of P
ents\_water master
that water is
ward to redu
unted for in c
nt meter) and
ween water pr
ding process
meter at the t
mends replaci
contribute t
013.
ng for the wa
ading system
ential loss re
educe City la
electronic m
.
rovides deta
information
City of A
Water Master
Previous Rep
MTB0
r plan\final\0713 m
s being lost i
uce the differ
calculating t
d water mete
roduced and
s water in th
treated water
ing the 15-20
to unaccount
ater lost due
m. Because o
evenues. Th
abor costs.
meter reading
ailed informa
on the
ngels
Plan
eports
020401
mp.docx
in
rence
the
ered
d
e
r
0 tedto
old
e
g
ation
Angels WM
July 2013

1. D

2. O

3. D

4. A

5. C

6. P

7. M

8. P

2.8 L
The City

1. R
8 2. R

3. R

4. R

5. R

6. R

7. R
Recently

1. P
hy
MP
Detailed desc
Overview of
Detailed stand
Abnormal con
Calibration an
rocedures fo
Maintenance
rocedures in
List of Wate
provided th
Replace wate
70 South Ma
Replace CLA
Replace fire h
Replace blow
Replace old s
Replace blow
Replace wate
y completed w
ipeline on H
ydrant on th
cription of un
start-up proc
dard operatin
nditions and
nd monitorin
or record kee
of each of th
n emergency
r Services o
he following
er main and w
ain Street.

A-valve box o
hydrant (dre
woff valve on
steel pipeline
woff valve on
er services at
water main r
Hillside Cour
he end of the
nit processes
cedures.
ng procedur
d troubleshoo
ng the plant.
eping and rep
he WTP com
y situations.
or Mains to
list of water
water service
on Mark Tw
sser) in fron
n Bruntz Roa
es on corner
n 859 Gold C
t dead end of
replacement
rt (replaced a
pipeline).

C
2–9
n:\m
s at the WTP
res.
oting.

porting.
mponents.
be Replaced
r services or
es from 876
wain Road an
nt of Middlet
ad.
of Mark Tw
Cliff Road.
f Holley to M
s include:
and upgrade
Chapter 2: Su
mtb020401\docume
P.
d
mains to be
South Main
nd Echo Stre
ton’s on Nor
wain Road.

Main.
d to 6-inch p
Wa
ummary of P
ents\_water master
e replaced:
n Street to ap
eet.
rth Main Stre
pipeline with
City of A
Water Master
Previous Rep
MTB0
r plan\final\0713 m
pproximately
eet.
h a dry barre
ngels
Plan
eports
020401
mp.docx
y
el
Angels WM
July 2013
3De
The City
distributi
existing w

3.1 R
The raw
and mult
City has
agreemen
delivery
Water on
Union, U
downstre
Upper Ut
then to H
into the L
Lower U
town of M
and is div
capacity
2011 Wa
diverts w
powerhou
An agree
Course to
that surfa
City’s W
of the Cit

3.2 W
The City
filtration
is provid
MP
escript
’s existing w
ion facilities
water system
Raw Water D
water source
iple tributari
contractual r
nts with Pac
system is pr
n the North F
Utica, and Sp
eam along th
tica Canal. F
Hunter’s Rese
Lower Utica
Utica Canal is
Murphys, an
verted into A
of up to 100
ater Audit [6
water to the W
use.
ement betwe
o divert up to
ace water fro
WWTP, when
ty’s annual a
Water Treat
acquired the
treatment an
ded below an
tion of
water system
. Each of the
m facilities ar
Delivery Sy
e for the City
ies. Raw wa
rights for up
ific Gas and
ovided below
Fork of the S
picer Meadow
he North Fork
From the Up
ervoir throug
Canal, also
s used for hy
nd to other pr
Angels Ditch
0 AF and rep
]. Below Ro
WTP. Unuse
en Greenhor
o 450 AFY o
om Angels C
n available. D
allocation of
tment Plant
e WTP from
nd disinfecti
nd described
Existi
m consists of
e existing sy
re shown in
stem
y is surface w
ter is deliver
p to 1,600 ac
d Electric Co
w and descri
Stanislaus Ri
w). Water re
k of the Stan
per Utica Ca
gh the Tunn
known as th
ydroelectric g
rivate users.
h. Water in A
presents a 30
oss Reservoir
d water disc
rn Creek Ass
of surface w
Creek should
Diversions fr
f 1,600 AFY
m PG&E in 1
ion with sod
in more deta
3–1
n:\m
ng Wa
raw water su
ystem compo
Figure 3-1.
water from t
red to the Ci
re-feet per y
ompany (PG&
ibed in great
iver is stored
eleased from
nislaus River
anal, water i
el Tap. From
he flume, wh
generation a
Following M
Angels Ditch
0-day emerge
r, water trav
charges to An
sociates L.P
water from An
d be a second
rom Angels
Y.
984. The W
dium hypoch
ail in Chapte
mtb020401\docume
ater Sy
upply, treatm
onents is des
the North Fo
ity via a flum
year (AFY) o
&E). An ove
ter detail in C
d in four upp
m these upper
r to a diversi
is diverted to
m Hunter’s R
hich is owne
and for water
Murphys, the
h travels to R
ency supply
vels to the An
ngels Creek
. and the Cit
ngels Creek
dary source t
Creek to GH
WTP is equipp
hlorite solutio
er 7.
ents\_water master
ystem
ment, storage
scribed in thi
ork of the St
me and canal
of water thro
erview of the
Chapter 6.
per reservoir
r reservoirs c
ion ditch kn
o the Collierv
Reservoir, w
ed and operat
r deliveries t
e water ente
Ross Reservo
for the City
ngels Foreba
after the An
ty allows the
k [2]. The agr
to recycled w
HC Golf Cou
ped for conv
on. An overv
MTB0
r plan\final\0713 m
e, and
is chapter. T
anislaus Riv
l system. Th
ough a series
e raw water
rs (Alpine,
continues
own as the
ville Tunnel
water is releas
ted by UPA.
to the City, t
ers Angels C
oir which ha
y according t
ay where the
ngels
e GHC Golf
reement stat
water from th
urse count as
ventional
view of the W
020401
mp.docx
The
ver
he
s of
l and
sed
. The
the
reek
as a
o the
e City
tes
he
s part
WTP

LEGEND CITY LIMITS WATER DISTRIBUTION SYSTEM NETWORK FIRE HYDRANT AIR RELEASE VALVE BLOWOFF VALVE PRESSURE REDUCING VALVE SURGE VALVE Angels WM
July 2013
Raw wat
flocculat
a sodium
storage ta
the City’
basin cle
WTP inc
Forebay
and press
injected p
The total
filter is u

3.1 mgd

3.3 D
The exist
are descr

2.5 MG t
(approxim
Distribut
release v
materials
in newer
galvanize
MP
er is receive
ion basin, a
m hypochlorit
ank, and a 3
s distribution
aning is disc
cludes: 1) alu
and the flocc
sure filters; 3
prior to treat
l plant capac
under conside
with one filt
Distribution
ting water di
ribed further
treated water
mately 85 pe
tion system f
alves (ARV
s include Am
areas (less t
ed steel in ol
ed at the WT
sedimentatio
te disinfectio
,508 foot (ft
n system by
charged into
uminum-base
culation bas
3) caustic so
ted water sto
city is 2.0 mg
eration by th
ter out of ser
System
istribution is
in Chapter 8
r storage tan
ercent reside
features inclu
s), blowoff v
merican Wate
than 20 year
lder areas.

P from the A
on basin, fou
on system w
) transmissio
gravity. Filt
a stock pon
ed coagulant
in; 2) sodium
oda injected p
orage tank.
gd with one p
he City, and
rvice.
s separated in

8. The entire
nk at the WT
ential). Pipel
ude fire hyd
valves, press
er Works As
s old) and as
Chapter 3
3–3
n:\m
Angels Foreb
ur filter-feed
with an on-sit
on main that
ter backwash
nd on a neigh
t injected int
m hypochlor
prior to pres
pressure filt
if constructe
nto five pres
e distribution
TP. The syste
ines range fr
drants (includ
sure relief va
ssociation (A
sbestos ceme
3: Descriptio
mtb020401\docume
bay. WTP fa
d pumps in p
te generator,
t delivers wa
h water and
hboring ranc
to raw water
rite injected
ssure filters;
ter out of ser
ed would bri
ssure zones:
n system is f
em serves 1,7
from 2-inch t
ding wharf h
alves (PRVs
AWWA) C90
ent, spiral w
Wa
on of Existin
ents\_water master
acilities inclu
parallel, three
, a 2.5 MG tr
ater from the
water from
ch. Chemical
r between th
prior to floc
and 4) zinc
rvice. Installa
ing the total
Zones A – E
fed by gravit
769 metered
to 14-inch di
head style hy
s), and a surg
00 polyviny
weld steel, du
City of A
Water Master
ng Water Sy
MTB0
r plan\final\0713 m
ude a four-st
e pressure fi
reated water
e storage tan
sedimentatio
l addition at
he Angels
cculation bas
orthophosph
ation of a fo
plant capaci
E. Pressure z
ty from the
d connection
iameter.
ydrants), air
ge valve. Pip
yl chloride (P
uctile iron, or
ngels
Plan
ystem
020401
mp.docx
tage
lters,
r
nk to
on
the
sin
hate
ourth
ity to
zones
ns
pe
PVC)
r
Angels WM
July 2013
4Ap
A review
water sys

4.1 S
An agree
Power A
North Fo
Hunter’s
Resource
water allo
necessary
In additio
surface w
of the wo
provide a
The City
Waterwo

1. A

2. T
so

3. B
in

4. T
b

5. T
sh
su
fo

4.2 T
In genera
process r
regulatio
MP
pplicab
w of applicab
stem are pro
ource Capa
ement betwe
gency (NCP
ork of the Sta
Reservoir fo
es (DWR) M
ocations. Th
y to firm-up
on to securin
water supply
ooden flume
a supplemen
’s water sup
orks Standard
At all times, t
The water sys
ource capaci
Both the MDD
n each indivi
The source ca
ased on adeq
The source ca
hould be inc
ufficient stor
oreseeable sh
Treatment P
al, although
residuals [6],
ns. In additi
ble Reg
ble regulation
vided in this
acity
en Calavera
PA) provides
anislaus Rive
for use by UP
May 1 forecas
here are unce
water alloca
ng a firm allo
with ground
delivery sys
ntal water sup
pply capacity
ds [10]. Spec
the water sys
stem should
ity, storage c
D and PHD
idual pressur
apacity of a
quately supp
apacity of a p
luded in the
rage or stand
hutdowns by
Plant
improvemen
, the City W
on, recent C
gulatio
ns and the de
s chapter.
s County Wa
s a schedule
er (through t
PA [9]. This
st of ‘total ru
ertainties of d
ations and ag
ocation of so
dwater. Beca
stem, more i
pply.
y will be eva
cifically, the
stem’s sourc
be able to m
capacity, and
requirement
re zone.
surface wate
ported and do
purchased w
total source
dby source c
y the supplie
nts may be n
WTP complies
California De
4–1
n:\m
ons and
evelopment
ater District
of ‘Maximu
the Tunnel T
agreement i
unoff’ and is
delivery volu
greements be
ource water,
ause of the 2
importance h
aluated based
e following r
ce(s) should
meet four hou
d/or emergen
ts should be
er supply sho
ocumented d
water connec
e capacity of
capacity to m
er.
needed to inc
s with applic
epartment of
mtb020401\docume
d Desig
of appropria
(CCWD) an
um Delivery’
Tap) and Mil
is based on t
s comprised
lumes during
etween CCW
a goal of Ci
2001 Darby F
has been pla
d upon criter
requirements
have the cap
urs of peak h
ncy source c
met in the w
ould be the l
data.
ction between
f the purchas
meet user req
crease reliab
cable Califor
f Public Heal
ents\_water master
gn Cri
ate design cr
nd Northern
’ volumes of
ll Creek deli
the Departm
of six steps
g very dry ye

WD, NCPA,
ity officials i
Fire that des
aced on locat
ria within the
s apply:
pacity to me
hour demand
connections.
water system
lowest antici
n two public
ser if the pur
quirements d
ility and pro
rnia drinking
lth (CDPH)
MTB0
r plan\final\0713 m
iteria
riteria for the
California
f water from
iveries into
ment of Water
of decreased
ears, and it i
and UPA.
is to augmen
stroyed a sec
ting a well to
e California
eet the MDD
d (PHD) wit
m as a whole
ipated daily
c water syste
rchaser has
during reason
operly dispos
g water
corresponde
020401
mp.docx
e
m the
r
d
s
nt the
ction
o
D.
th
and
yield
ems
nably
se of
ence
Angels WM
July 2013
indicates
Treatmen
with the
The WTP
provision
subseque

1. S
co

2. T
fi

3. S
pr

4. R
re
In additio
States En
Cryptosp

1. R

2. R
sh

3. T
tu

4.3 S
A 2.5 MG
In a 2011
and, spec
avoid ser
and a tran
distributi
parallel t
and a 14-
MP
that the City
nt Rule (no f
federal Stag
P will be eva
ns within the
ent design w
tandby repla
ontrol of uni
The plant sho
ilters are out
olids remov
rocess water
Recycle flow
ecycle proce
on, new recy
nvironmenta
poridium Act
Recycle flow
Raw water an
hould be pro
The recycled
urbidities of
torage Cap
G tank locate
1 memorand
cifically, the
rvice interrup
nsmission m
ion system. T
o the existin
-inch transm
y is in comp
further action
e 2 Disinfec
aluated based
e California s
ill focus upo
acement equ
it processes
ould be equip
t of service f
al treatment
r at the WTP
s should be r
ess water at t
ycling facilit
l Protection
tion Plan [14
should be le
nd recycle flo
ovided for re
water treatm
less than 2.0
acity
ed at the WT
um [15], CD
storage tank
ptions, the m
main to store
The second s
ng domestic w
mission main.

Cha
pliance with
n required) a
ctants and Di
d upon desig
surface wate
on the follow
uipment shou
for coagulat
pped with fil
for backwash
should be p
P).
returned to t
the WTP).
ties within th
Agency (EP
4]. The follo
ess than or e
ows should b
ecycle flows.
ment process
0 Nephelome
TP is the onl
DPH staff co
k and the tra
memorandum
and carry tre
storage tank
water supply
.”
apter 4: App
4–2
n:\m
the federal L
and has mad
isinfection B
gn criteria, re
er treatment
wing specific
uld be availa
tion, filtratio
lter units wh
h or mainten
provided for
the headwork
he WTP will
PA) technica
owing criteri
equal to 10 p
be controlled
.
s should be s
etric Turbidi
ly existing st
ommented on
ansmission p
m stated that
eated water
and the new
y system tha
plicable Regu
mtb020401\docume
Long Term 2
de significant
Byproducts R
eliability req
regulations
c requiremen
able to assure
on, and disinf
hich provide
nance.
recycle flow
rks of the WT
l be designed
al guidance [
a will be use
percent of the
d to avoid hy
selected and
ity Units (NT
torage tank w
n the reliabil
ipeline from
“the City ne
from the wa
w transmissio
at comprises
Wa
ulations and
ents\_water master
2 Enhanced
t progress to
Rule [11].
quirements,
[12]. The ev
nts:
e continuous
fection.
redundant c
ws (if City ch
TP (if City c
d in accordan
[13] and the
ed:
e plant influe
ydraulic surg
designed to
TU).
within the C
lity of the Ci
m the WTP in
eeds one mo
ater treatmen
on main will
of a 2.5 MG
City of A
Water Master
d Design Cri
MTB0
r plan\final\0713 m
Surface Wat
oward compl
and recyclin
valuation and
s operation a
capacity whe
hooses to rec
chooses to
nce with Un
California
ent flow.
ges. Equaliz
achieve
City water sy
ity water sys
nto the City.
ore storage ta
nt plant to th
l operate in
G storage tan
ngels
Plan
iteria
020401
mp.docx
ter
lying
ng
d
and
en
cycle
nited
zation
stem.
stem
To
ank
e
nk
Angels WM
July 2013
Storage c
Waterwo
and main

1. T
ca

2. S
sh
F

3. S
op
ar
R
st

4. C
m

4.4 D
The City
water by
more tha
MP
capacity with
orks Standard
ntenance con
The system sh
apacity, and/
torage capac
hutdowns of
ork of the St
torage capac
perational (s
re calculated
Resolution 21
torage is equ
City staff sho
maintenance,
Rural resid
Single fam
Single fam
Multiple re
businesses
Multiple re
story; light
Multiple re
and heavy
a
Fire flows
Distribution
distribution
gravity from
n 50 years, a
hin the City
ds [10], the C
nsiderations.
hould be abl
/or emergen
city should b
f the wooden
tanislaus Riv
city should b
system peaki
d based on th
1-78. Operat
ual to four ho
ould have the
cleaning, an
CITY
Land Us
dential (<2 lots
mily residential
mily residential
esidential up to
of one story
esidential units
t commercial a
esidential, three
industrial
and durations es
System
n system incl
m the WTP.
and pipe size
Cha
water system
City of Ange
The followi
le to meet fo
cy source co
be sufficient
n flume syste
ver.
be greater tha
ing) storage,
he flows and
tional storag
ours of MDD
e ability to re
nd re-coating
T

Y OF ANGELS

FIRE FLOW
se Category
/acre)
(<2 lots/acre)
(≥3 lots/acre)
o a fourplex; ne
s of >4 units, on
and light indust
e stories; heavy
stablished in Cit
ludes five pr
Certain pres
es range from
apter 4: App
4–3
n:\m
m will be ev
els 2010 Imp
ing criteria w
our hours of P
onnections.
to satisfy de
em that conv
an or equal t
, and emerge
d durations p
e is equal to
D.
emove a tank
g without ca
TABLE 4-1

S WATER MA

W REQUIREM
eighborhood
ne and two
trial
y commercial,
ty Resolution 21
ressure zones
ssure zones c
m 2-inch to
plicable Regu
mtb020401\docume
aluated base
provement S
will be applie
PHD with so
emands durin
veys water to
to the sum o
ency storage
presented in T
o 20 percent
k from servi
ausing servic

ASTER PLAN
MENTS
Fire Flow
(gpm)
500
500
750
750
1,500
2,000
-78.
s, and all of
contain pipin
14-inch. Som
Wa
ulations and
ents\_water master
ed upon the C
Standards [16
ed:
ource capaci
ng reasonab
o the City fro
of the require
e. Fire storag
Table 4-1 fro
of the MDD
ice for repair
ce interruptio
N
wa Dura
(hr
2 2
2 2
2 2
the pressure
ng that has b
me pipe size
City of A
Water Master
d Design Cri
MTB0
r plan\final\0713 m
California
6], and oper
ity, storage
bly foreseeab
om the North
ed fire storag
ge requireme
om City
D. Emergency
rs, inspection
ons.
ationa
rs)
2 2
2 2
2 2
e zones recei
been in use fo
s are unknow
ngels
Plan
iteria
020401
mp.docx
ation
ble
h
ge,
ents
y
n,
ive
for
wn.

City of Angels
Water Master Plan
Chapter 4: Applicable Regulations and Design Criteria
Angels WMP 4–4 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx As part of the master planning process, a computer model of the distribution system was developed. Computer simulations were used to evaluate the distribution system and identify necessary improvement projects. Evaluation and design criteria are summarized in Table 4-2.

TABLE 4-2

CITY OF ANGELS WATER MASTER PLAN

DISTRIBUTION SYSTEM EVALUATION AND DESIGN CRITERIA
Criteria Value Source
Minimum pressure – ADDa 40 psib 2010 Improvement Standards [16] Minimum pressure – MDD 35 psi Typical design standard
Minimum pressure – PHD 20 psi California Waterworks Standards [10] Minimum pressure – fire flow
plus MDD
20 psi 2010 Improvement Standards [16],
California Waterworks Standards [10]
Maximum pressure at service
connection
150 psi (PRV required
at 80 psi)
2010 Improvement Standards [16]
Maximum velocity 8 fpsc
(typical)
12 fps (short durations)
Typical design standards
Maximum head loss gradient 10 ft per 1,000 ft Typical design standard Minimum main size 4-inches California Waterworks Standards [10] a ADD = average day demand
b
psi = pounds per square inch
c fps = feet per second
Angels WM
July 2013
5Ex
The purp
future lan
as well a

5.1 S
The study
and does
requiring
provided
encompa
Figure 3-

5.2 L
City GIS
the study
current G
descriptio
MP
xisting
pose of this c
nd uses to pr
s for buildou
tudy Area
y area for th
not include
g annexation
d in GIS form
assed a total
-1).

Land Use
S data were a
y area. In add
GIS status of
ons are prese
and P
chapter is to
redict future
ut conditions
he Master Pla
areas within
will be the
mat were util
area of appr
analyzed to d
dition to land
f each parcel
ented in Tab
Project
develop an a
water dema
s.
an is based o
n the SOI be
subject of fu
lized for the
roximately 2
determine the
d uses based
: developed,
ble 5-1.
5-1
n:\m
ed Wa
appropriate w
ands for the 1
on the curren
eyond the Cit
uture technic
developmen
,280 acres (a
e distributio
d on the Gene
, partially de
mtb020401\docume
ater De
water deman
10-year and
nt City limits
ty limits. Wa
cal studies. L
nt of this cha
ac) within th
n of existing
eral Plan [1]
eveloped, or
ents\_water master
emand
nd factor for
20-year plan
s from the G
ater supplies
Land use dat
apter. The fu
he City limit
g and future
], data review
vacant. Lan
MTB0
r plan\final\0713 m
ds
r existing and
nning horizo
General Plan
s for areas
a for the Cit
urnished data
s (see
land uses w
wed included
nd use
020401
mp.docx
d
ons
[1]
ty
a
ithin
d the
Angels WM
July 2013
a. E
Overall l
reflecting
partially
and OS w
demands
MP
R
C
I
P
O
Existing Area
and use char
g historical w
developed a
were assume
.

CITY
Land U
Residential
HDR
MDR
RE
SFR

HDR-WMC
Commercial
BAE
CC
HC
SC
Industrial
I
Public
P

P (WWTP)
P-SCH
PR
PR-Golf
Other
SP
OS
ROW
as
racteristics w
water deman
areas) is pres
ed to have no
T

Y OF ANGELS

LAND USE
Use
C
were used to
nds. A summ
sented in Tab
o water dema
Chapter 5:
5-2
n:\m
TABLE 5-1

S WATER MA

E DESCRIPT
D
High-De
Medium-D
Resid
Single-F
Wor
Business A
Commun
Histor
Shoppi
I
Public (Wastew
Pu
Parks
G
Spec
O
Rig
develop an
mary of existi
ble 5-2 and F
ands and we
Existing an
mtb020401\docume

ASTER PLAN
TIONS
Description
ensity Resident
Density Reside
dential Estate
amily Residen
rldmark Club
Attraction/Expa
unity Commerc
ric Commercia
ing Commercia
Industrial
Public
water Treatme
ublic School
and Recreation
Golf Course
cial Planning
Open Space
ght-of-Way
appropriate
ing develope
Figure 5-1. P
ere excluded
Wa
nd Projected
ents\_water master
N
tial
ential
ntial
ansion
cial
al
al
ent Plant)
n
water dema
ed land uses
Parcels desig
from the an
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
and factor
(including
gnated as RO
nalysis of exi
ngels
Plan
mands
020401
mp.docx
OW
isting
City of Angels
Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-3 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 5-2

CITY OF ANGELS WATER MASTER PLAN

SUMMARY OF EXISTING LAND USES
Land Use
Number of
Parcelsa
Total
Developed
Areaa (ac)
Residential
HDR 128 80
MDR 68 51
RE 10 14
SFR 1,190 372
HDR-WMC 19 21
Commercial
BAE 21 26
CC 101 65
HC 79 16
SC 39 32
Industrial
I 5 16
Public
P 22 28
P (WWTP) 2 18
P-SCH 8 50
PR 9 18
PR-Golf 5 144
Other
SP 1 4
OS 5 12
ROW 154 216
Total 1,866 1,183
a Includes partially-developed land uses.

LAND USE LEGEND RESIDENTIAL HDR HIGH-DENSITY RESIDENTIAL MDR MEDIUM-DENSITY RESIDENTIAL RE RESIDENTIAL ESTATES SFR SINGLE-FAMILY RESIDENTIAL HDR-WMC WORLDMARK CLUB (HIGH-DENSITY) COMMERCIAL BAE BUSINESS ATTRACTION & EXPANSION CC COMMUNITY COMMERCIAL HC HISTORIC COMMERCIAL SC SHOPPING COMMERCIAL INDUSTRIAL I INDUSTRIAL PUBLIC P PUBLIC P (WWTP) PUBLIC (WASTEWATER TREATMENT PLANT) P-SCH PUBLIC SCHOOL PR PARKS & RECREATION PR-GOLF GOLF COURSE OTHER SP SPECIAL PLANNING OS OPEN SPACE ROW RIGHT-OF-WAY N/A UNDEVELOPED PARCEL Angels WM
July 2013
b. F
Land use
summary
MP
Future Areas
es for parcels
y of buildout
s
s shown in th
t land use is
CITY
SUM
Residentia
HDR
MDR
RE
SFR
HDR-W
Commerci
BAE
CC
HC
SC
Industrial
I
Public
P
P (WWT
P-SCH
PR
PR-Golf
Other
SP
OS
ROW
Total
a Includes d
he GIS files
presented in
T

Y OF ANGELS

MMARY OF
Land Use
al
WMC
ial
TP)
f
developed, partia
Chapter 5:
5-5
n:\m
were used to
n Table 5-3 a
TABLE 5-3

S WATER MA

BUILDOUT L
Num
of Pa
1 2
ally developed, a
Existing an
mtb020401\docume
o estimate fu
and displaye

ASTER PLAN

LAND USES
mber
arcelsa
To
Buil
Area
163
75 26
1,472
19 31
133
85 50
11 28
19 8
10 5
36 5
154
2,330 2
and vacant land u
Wa
nd Projected
ents\_water master
uture water d
ed in Figure 5
N
otal
ldout
aa (ac)
223
54 126
507
21 59
102
21 97
32 31
266
50 22
144
297
12 216
2,280
uses.

City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
demands. A
5-2.
ngels
Plan
mands
020401
mp.docx

LAND USE LEGEND RESIDENTIAL HDR HIGH-DENSITY RESIDENTIAL MDR MEDIUM-DENSITY RESIDENTIAL RE RESIDENTIAL ESTATES SFR SINGLE-FAMILY RESIDENTIAL HDR-WMC WORLDMARK CLUB (HIGH-DENSITY) COMMERCIAL BAE BUSINESS ATTRACTION & EXPANSION CC COMMUNITY COMMERCIAL HC HISTORIC COMMERCIAL SC SHOPPING COMMERCIAL INDUSTRIAL I INDUSTRIAL PUBLIC P PUBLIC P (WWTP) PUBLIC (WASTEWATER TREATMENT PLANT) P-SCH PUBLIC SCHOOL PR PARKS & RECREATION PR-GOLF GOLF COURSE OTHER SP SPECIAL PLANNING OS OPEN SPACE ROW RIGHT-OF-WAY N/A UNDEVELOPED PARCEL Angels WM
July 2013

5.3 A
Historica
water (i.e
paramete
productio
Consump
The GHC
surface w
Although
diversion
water fro
water pro
for inclus
a. W
Water pr
water del
Historica
in Table
339 MG,
The 2007
productio
chapter a
MP
Analysis of E
al water prod
e., system lo
ers to estimat
on data are b
ption data w
C Golf Cour
waters from A
h the GHC G
ns from Ang
om UPA. GH
oduction from
sion in futur
Water Produc
roduction dat
livered to the
al monthly w
5-4, the ann
, correspond
7-2012 avera
on of 0.86 m
as an overall
Existing Wa
duction and c
sses), peakin
te and alloca
based on infl
ere compiled
se meets its
Angels Cree
Golf Course d
els Creek ar
HC Golf Cou
m the WTP
re water requ
ction
ta are based
e WTP. The
water product
ual producti
ding to an ave
age annual p
mgd. The 200
target value
ater Demand
consumption
ng factors, a
ate existing a
luent flow m
d from custo
irrigation de
ek and season
does not rec
e included a
urse irrigatio
and metered
uirements for
on influent f
influent flow
tion data for
ion at the WT
erage day pr
production is
07-2012 aver
e for water d
Chapter 5:
5-7
n:\m
ds
n data were a
an appropriat
and projecte
meter records
omer billing
emands with
nal use of re
eive finished
as part of the
on demands a
d City water
r the City.
flow meter (
w meter is lo
r the City WT
TP from 200
roduction of
s 314 MG an
rage day pro
emand facto
Existing an
mtb020401\docume
analyzed to d
te water dem
ed future wat
s of raw wate
records base
h a combinat
ecycled wate
d waters pro
e City’s annu
are not a com
usage data b
(aka, upper p
ocated upstr
TP are prese
07 to 2011 ra
f 0.75 mgd an
nd correspon
oduction of 0
or developme
Wa
nd Projected
ents\_water master
determine no
mand factor,
ter demands
er delivered
ed on water
tion of direct
er from the W
oduced by th
ual deliveries
mponent of t
but were eva
plant meter)
ream of the p
ented in Tab
anged from 2
nd 0.93 mgd
nds to an ave

0.86 mgd is u
ent and calib
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
on-revenue
and other
. Water
to the WTP
meter readin
t diversions
WWTP.
he WTP, the
s of surface
the historica
aluated separ
records of r
plant headwo
le 5-4. As sh
275 MG to
d, respectivel
erage day
used in this
bration.
ngels
Plan
mands
020401
mp.docx
.
ngs.
of
al
rately
raw
orks.
hown
ly.

Angels WM
July 2013
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Tota
Tota
Aver
a The
Water pr
for evalu
should be
processes
hypochlo
in the pro
b. 2
Trends in
2011 and
Table 5-5
productio
1) increa
rate struc
increase
rates for
projectio
MP
Month
y
al
al (AF)
rage Day (mgd
e monthly produc
roduction dat
uations of ava
e noted that
s at the plant
orite solution
ojected dema
012 Water P
n water prod
d more close
5, monthly w
on in 2011. T
sed irrigatio
cture (the add
in plant prod
2007-2012 (
ns.

CITY

HISTORI
WA
2007

16.2 14.4

18.4 20.8

30.5 38.3

46.1 47.3

36.4 26.6

20.6 16.3
332
1,018
d) 0.91
ction data is from
ta based on t
ailable water
the WTP inf
t. Process w
n and represe
ands for eva
Production T
duction for th
ly represent
water produc
The apparen
n resulting f
dition of 1,0
duction in 20
(as shown in
T

Y OF ANGELS

ICAL MONT

TER TREAT
Month
2008

16.5 14.8

18.3 26.5

32.8 38.3

44.3 47.5

37.4 28.5

18.3 15.6
339
1,039

0.93 m the WTP influ
the WTP inf
r supply and
fluent flow m
ater is drawn
ents a signifi
aluation of th
Trends
he beginning
trends in the
ction in 2012
nt increasing
from a relativ
000 cubic fee
012 may rep
n Table 5-4)
Chapter 5:
5-8
n:\m
TABLE 5-4

S WATER MA

THLY WATER

MENT PLAN
hly Production
2009 20

13.4 13

11.4 11

14.1 14

21.3 13

30.3 20

32.4 31

42.0 40

40.7 40

35.1 34

25.0 25

18.4 15

15.0 13
299 2
918 8

0.82 0.
uent flow meter (
fluent flow m
d distribution
meter does n
n from the st
ficant deman
he WTP unit
g of 2012 sho
e dry-years o
2 is up to 40
water produ
vely dry win
et to the mon
present a long
will serve as
Existing an
mtb020401\docume

ASTER PLAN

R PRODUCT
NT, 2007-2012
na (MG)
010 2011

3.8 13.0

1.7 11.9

4.3 13.9

3.9 16.1

0.2 26.7

1.2 32.2

0.8 46.0

0.1 47.3

4.2 41.8

5.8 27.2

5.4 18.4

3.2 17.8
75 313
43 959
75 0.86
(upper plant met
meter as pres
n system per
not account f
torage tank o
nd at the WT
processes in
ow significa
of 2008 and
percent high
uction trends
nter; and 2) c
nthly base ra
g-term trend
s the “startin
Wa
nd Projected
ents\_water master
N
TION,
2 2012 A

18.2 16.7

15.8 18.3

34.2 38.7

42.8 -
-
-
-
-
-
-
-
ter).
sented in Tab
rformance. H
for water use
outlet to gen
P. Process w
n Chapter 7.
ant increases
2009. As sh
her than the
s in 2012 ma
changes in th
ate). Because
d, average w
ng point” for
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
2007-2012
Average (MG)

15.2 13.5

15.8 19.5

29.1 35.2

43.7 44.6

37.0 26.6

18.2 15.6
314
963

0.86 ble 5-4 are u
However, it
ed in various
nerate sodium
water is inclu
as compare
hown in
monthly
ay be related
he City wate
e the apparen
ater product
r demand
ngels
Plan
mands
020401
mp.docx
useful
s unit
m
uded
d to
d to:
er
nt
tion
Angels WM
July 2013
c. M
The City
1,769 ser
to DWR
City repo
related co
MP
Metered Wate
’s water syst
rvice connec
for 2011 is p
orts an additi
onnections [
CITY
2012
WATER
Mon
Jan
Feb
Mar
Apr
May
Jun
Jul
a
Per Tab
er Usage
tem serves a
ctions. The n
presented in
ional 350 un
6].

T

Y OF ANGELS
2 MONTHLY

R TREATMEN
nth
2012
Pro
(
ble 5-4.
a population
number of m
Table 5-6. I
nmetered con
Chapter 5:
5-9
n:\m
TABLE 5-5

S WATER MA

Y WATER PR

NT PLANT, J
Monthly
oduction
(MG)
P

18.2 16.7

15.8 18.3

34.2 38.7

42.8 of approxim
etered servic
In addition to
nnections for
Existing an
mtb020401\docume

ASTER PLAN

RODUCTION,

JANUARY-JU
Percent Increa
from 2011a
40%
40%
14%
13%
28%
20%
-7%
mately 3,836
ce connectio
o the metere
r fire hydran
Wa
nd Projected
ents\_water master
N
,
ULY
ase
people [17,
ons by user ty
ed service co
nts and other
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
18] through
ype as repor
onnections, t
r fire service
ngels
Plan
mands
020401
mp.docx
h
rted
the
e
City of Angels
Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-10 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 5-6

CITY OF ANGELS WATER MASTER PLAN
METERED WATER SERVICE CONNECTIONS BY USER TYPE FOR 2011 User Type
Number of Metered
Connections
Single Family Residential 1,469
Multi-Family Residentiala 33
Commercial/Institutionalb
211
Industrial 3
Landscape Irrigationc
47 Otherd
3 Agricultural Irrigatione
3 Total 1,769
a
“Multi-Family Residential” includes condominiums, apartment complexes, and mobile home parks.
b
“Commercial” includes general businesses, restaurants, hotels/motels, markets, laundromats, and car washes. The GHC Timeshare has 7 commercial accounts for their restaurant, pools, restrooms, spa lockers, and a lift station. “Institutional” includes schools, City buildings (such as City Hall, the Firehouse, and the Police Department), City parks, and process water for the WTP and WWTP [19].
c
“Landscape Irrigation” represents areas where the meter is used strictly for landscaping and includes subdivision and business landscaping, but excludes City parks. The GHC Timeshare has 3 landscape irrigation accounts [19]. d
“Other” includes construction meters.
e
“Agricultural Irrigation” represents areas for crops and raising cattle/animals [19].

Historical metered water usage by user type is presented in Table 5-7. As shown in Table 5-7, the metered water usage from 2007 to 2011 ranged from 260 MG to 325 MG. The 2007-2011 average annual water usage is 293 MG which corresponds to an ADD of 0.80 mgd.

Angels WM
July 2013
U
Single Fa
Multi-Fam
Commerc
Industrial
Landscap
Other
Agricultu
Total
Total (AF
Average
d. N
Non-reve
reflected
authorize
meter ina
losses (sy
includes
equipmen
Non-reve
the 2007-
high perc
new influ
10 percen
against g
assessme
the Intern
IWA/AW
system ch
rather tha
for the pu
will be u
Capita W
MP
HIS
User Type
amily Resident
mily Residenti
cial/Institution
l
pe Irrigation
ural Irrigation
F)
Day (mgd)
Non-Revenue
enue water (
in customer
ed consumpt
accuracies, u
ystem leakag
system losse
nt wash-dow
enue water fr
-2011 averag
centage of no
uent flow me
nt are typica
gauging wate
ent of the sys
national Wat
WWA Water
haracteristic
an relying on
urpose of thi
sed as an adj
Water Deman
CITY

TORICAL M
2007
tial 203.
ial 17.
al 81.

2. 16.

2. 3.
32 99

0.8 e Water
aka, unaccou
r billings. No
tion (water fo
unauthorized
ge and storag
es at the WT
wns (i.e., unr
from 2007 th
ge for non-re
on-revenue w
eter at the W
ally an indica
er losses as a
stem’s water
ter Associati
Audit Meth
cs as input to
n a single, si
is Master Pla
djustment to a
nds.

T

Y OF ANGELS

METED WATE
Metere
7 2008
0 202.0
0 19.0
0 81.0
0 2.0
0 16.0
0 1.0
0 3.0
5 323
7 991
9 0.88
unted-for wa
on-revenue w
for firefightin
d consumptio
ge tank over
TP from proc
recovered or
hrough 2011
evenue wate
water in 201
WTP in Febru
ator of good
a percentage
r losses and t
ion (IWA)/A
hod relies up
o several perf
implistic per
an, the 2007
account for n
Chapter 5:
5-11
n:\m
TABLE 5-7

S WATER MA

ER USAGE B
d Water Usag
2009
187.8

15.7 71.7

1.7 13.8

0.8 3.1
294
904

0.81 ater) is the d
water as defi
ng, flushing,
on, and syste
rflows) [20].
cess water in
non-recycle
is presented
er is 6.1 perc
1 of 16.9 pe
uary 2011 [2
water system
total produc
the effect on
AWWA Wat
on the quant
formance in
rcentage of u
-2011 avera
non-revenue
Existing an
mtb020401\docume

ASTER PLAN

BY USER TYP
ge (MG)
2010 2
165.9

14.5 67.3

0.9 13.3

0.4 2.2
264
811

0.72 distributed vo
fined by AW
, etc.) plus ap
ematic data h
Non-revenu
ncluding filte
ed water).
d in Table 5-
cent of the to
ercent may b
21]. Although
m performan
ction [20]. F
n City revenu
ter Audit Me
tification of
dicators to r
unaccounted
age for non-r
e water dema
Wa
nd Projected
ents\_water master
N
PE, 2007-2011
200
Av
2011 (M
169.8

12.0 62.8

0.6 13.3

0.1 1.9
260
799

0.71 olume of wa
WWA is the su
pparent loss
handling erro
ue water for
er backwash
-8. As shown
otal water pro
be due to the
h losses of le
nce, AWWA
or a more m
ues, AWWA
ethod [20]. T
water volum
reveal water
-for water [2
revenue wate
ands in Sect
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
7-2011
verage
MG)
Per
o
To
185.7 6

15.6 72.8 2

1.4 0.

14.5 0.8 0.

2.6 0.
293 100
901

0.80 ater that is no
um of unbill
es (custome
ors) plus rea
the City also
hing and
n in Table 5-
oduced. The
installation
ess than
A recommen
meaningful
A recommen
The
mes, costs, an
loss standin
20]. Howeve
er of 6.1 perc
ion 5.3-e, Pe
ngels
Plan
mands
020401
mp.docx
rcent
of
otal
63%
5%
25%
.5%
5%
.3%
.9%
0%
-
-
ot
led
r
al
o
-8,
e
of a
ds
nds
nd
ng
er,
cent
er
Angels WM
July 2013
T
T
N
N
a
b
e. P
City popu
customer
residentia
adjusted
an averag
City 2010
150 gpcd
water dem
factor de
MP
Pa
Total Annual P
Total Annual M
Non-Revenue W
Non-Revenue W
See Table 5-4.

See Table 5-7.
er Capita W
ulation data
r billing reco
al water dem
total residen
ge per capita
0 Improvem
d, within 2 pe
mand of 586
termined in
Curren
Total R
Adjust
Avera
a
April
b
2007-
calcu
c gpd =
d
Total
avera
CITY
N
arameter
roductiona (MG
Metered Usageb
Water (MG)
Water (%)
Water Demand
and per-cap
ords are sum
mand adjuste
ntial water de
a water dema
ment Standard
ercent of the
6,000 gpd wi
Section 5.5,
CITY
EXIS
nt Population (
Residential Wa
ted Total Resid
ge Per Capita W
2010 population
-2011 average m
lated from value
gallons per day
residential dem
age non-revenue
T

Y OF ANGELS

NON-REVENU
200
G) 3
b
(MG) 3

2. ds
ita water dem
mmarized in T
ed to account
emand divid
and of 153 g
ds Section 1
e calculated d
ill be used as
Developme
T

Y OF ANGELS

STING PER C
Parameter
(Capita)a
ater Demand (g
dential Water D
Water Demand
n estimate from
metered water usa
es in Table 5-7 (e
and including al
demand of 6.1%
Chapter 5:
5-12
n:\m
TABLE 5-8

S WATER MA

UE WATER,
07 2008
332 339
325 323
7 16
1% 4.7%
mands based
Table 5-9. A
t for non-rev
ded by the cu
gallons per ca

6.06.01 [16]
demand of 1
s a target val
ent of Water
TABLE 5-9

S WATER MA

CAPITA WAT
r
gpd)b,c
Demand (gpd)d
d (gpcd)
Dept. of Finance
age for single-fa
excludes non-res
llowance for non
% per Table 5-8)
Existing an
mtb020401\docume

ASTER PLAN
2007-2011
2009 201
299 27
294 26
5 1

1.7% 4.0%
d on existing
As shown in T
venue water
urrent City p
apita per day
] identifies a
153 gpcd. Th
lue for valid
Demand Fa

ASTER PLAN

TER DEMAND
d
e, Table E-4 [17
amily and multi-f
sidential water u
n-revenue water
.

Wa
nd Projected
ents\_water master
N
0 2011
2 75 313
64 260
11 53
% 16.9%
g water prod
Table 5-9, th
demand is 5
population of
y (gpcd). Fo
a design per c
he adjusted t
dation of the
actor.

N
D
Value
3,836
552,000
586,000
153
7, 18].
family residentia
usage).
r demand (assum
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
2007-2011
Average
312
293
19 6.1%
duction and
he total
586,000 gpd.
f 3,836 resul
r compariso
capita deman
total resident
water dema
al
me
ngels
Plan
mands
020401
mp.docx
. The
lts in
n,
nd of
tial
and
Angels WM
July 2013
f. G
As discu
surface w
water beg
Course a
delivery
In additio
the years
In 2012,
delivered
An agree
(450 AFY
case scen
Golf Cou
largest ir
surface w
104 MG
Golf Cou
MP
Greenhorn Cr
ssed previou
waters from A
gan in April
re summariz
for GHC Go
HIST
Mon
Apr
May
Jun
Jul
Aug
Sep
Oct
Total
Total (AF)
Average Da
on to the 55.
s 2009-2011

53.6 MG (1
d to GHC Go
ement betwe
Y) of Angels
nario, if the W
urse would b
rrigation dem
water diversi
(319 AFY).
urse is assum
reek Golf Co
usly, GHC G
Angels Cree
2009 [21]. H
zed in Table
olf Course is
CITY

TORICAL SU
O
M
nth
ay (mgd)
0 MG (169 A
was 31.0 M
65 AF) of cr
olf Course fo
en the City a
s Creek surfa
WWTP faile
be entitled to
mand recorde
ion and recyc
For future w
med at this m
ourse Irrigat
Golf Course m
ek and recycl
Historical su
5-10. As sh
s 55.0 MG (1
TA

Y OF ANGELS

URFACE WA

OF GHC GOL
Monthly Irriga
2009

0.0 0.0

9.4 17.2

14.6 9.4

3.9 54.4
167

0.15 AF) of creek
MG (95 AF) f
reek water an
or a total irri
and Greenho
face water fo
ed to produce
o take their e
ed for GHC
cled water d
water deman
maximum his
Chapter 5:
5-13
n:\m
ion Demand
meets its irri
led water fro
urface water
own in Tabl
169 AF).

ABLE 5-10

S WATER MA

TER DELIVE

LF COURSE,
ation with Surf
2010

0.0 1.7

10.1 13.1

17.1 12.7

0.0 54.7
168

0.15 k water, the
for a total irr
nd 50.1 MG
igation dema
orn Creek As
or irrigation o
e recycled w
ntire supply
Golf Course
delivery for g
nd projection
storical value
Existing an
mtb020401\docume
ds
igation dema
om the WWT
deliveries fo
le 5-10, the a

ASTER PLAN

ERIES FOR I
2009-2011
face Water (M
2011

4.5 10.5

13. 14.

5.3 7.6

0.0 55.8
17 0.15
average deli
rigation dem
G (154 AF) o
and of 104 M
ssociates L.P
of the GHC
water meeting
from Angel
e occurred in
golf course ir
ns, the annua
e.

Wa
nd Projected
ents\_water master
ands with a c
TP. Irrigatio
or irrigation
average annu
N

IRRIGATION
MG) 2009-
Aver
(M
5 5
1 8
3 6
0 8
1 5
ivery of recy
mand of 86.0
f recycled w
MG (319 AF
P. allows up
Golf Course
g Title 22 St
ls Creek. . H
n 2012. The
rrigation in 2
al irrigation d
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
combination
on with recyc
of GHC Go
ual surface w
N
-2011
rage
MG)

1.5 4.1

10.9 15.0

12.3 9.9

1.3 55.0
169

0.15 ycled water f
MG (264 AF
water was
).
to 147 MG/
e [2]. In a wo
tandards, GH
Historically, t
combined
2012 was
demand for
ngels
Plan
mands
020401
mp.docx
n of
cled
olf
water
for
F).
/year
orst
HC
the
GHC
Angels WM
July 2013

5.4 P
Peaking f
condition
hydraulic
evaluatio
to MDD.
previous
a. M
The max
average d
typically
shown in
confirme
of the dat
D
M
A
M
a
b
The reco
intended
recomme
specify a
recomme
amendme
[22]. The
1,440 gpm
factor wi
MP
Peaking Fact
factors are u
ns greater tha
c analysis of
on and sizing
. Peaking fac
studies.

Maximum Da
imum day p
day producti
sized for M
n Table 5-11
ed that maxim
ta presented
MA
Date of Maximu
Maximum Day
Average Day Pr
Maximum Day
Per 2011 Water
See Table 5-4.
mmended m
for master p
ended factor
a maximum d
ended factor
ent for 1993
e City’s wate
m [23]. City
ill influence
tors
used to calcu
an average a
f the distribu
g of improve
ctors are obt
ay Demand
eaking facto
ion for the ye
MDD. The av
. Daily produ
mum day pro
d in Table 5-1
CITY

AXIMUM DAY
Item
um Day Produ
Production (M
roduction (MG
Peaking Facto
Audit [6].
maximum day
planning pur
of 2.2 is con
day peaking
is also cons
and 1994 w
er supply per
y growth rate
the timing o
ulate the wate
annual dema
ution system.
ements includ
ained from a
or is the ratio
ear. Water tr
erage annua
uction recor
oduction in 2
11, the recom
TA

Y OF ANGELS

Y PRODUCT
20 uctiona Jul
MG) 1
G)
b 0
or 2
y peaking fa
rposes (e.g. t
nsistent with
factor of 2.0
istent with h
with maximum
rmit limits th
es in conjunc
of improvem
Chapter 5:
5-14
n:\m
er demands e
ands. The res
. Typical pea
de the ratio o
a review of h
o of the maxi
ransmission,
al and maxim
rds for 2011
2011 did not
mmended m
ABLE 5-11

S WATER MA

TION PEAKIN
007 2
y 6/7 Au
.80

0.91 2.0
actor of 2.2 i
timing of imp
h the City 20
0 or 3.0 depe
historical dat
m day peaki
he maximum
ction with th
ments needed
Existing an
mtb020401\docume
expected un
sulting dema
aking factors
of MDD to A
historical wa
imum day pr
, treatment, a
mum day pro
were not ev
t exceed 2.0
maximum day

ASTER PLAN

NG FACTOR
Year
2008
ug 17/18 Ju

2.00 0.93

2.2 s based on a
mprovements
010 Improve
ending on th
ta presented
ing factors o
m flow rate t
he recommen
d at the WTP
Wa
nd Projected
ents\_water master
nder varying
and condition
s necessary f
ADD and th
ater producti
roduction fo
and pumping
oduction for
aluated but t
MG [21]. B
y peaking fac
N
RS, 2007-2010
2009
uly 27/28

1.61 0.82

2.0 actual produc
in the CIP).
ment Standa
he project siz
in the City’
of 2.2 and 2.3
through the W
nded maximu
P.

City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
demand
ns are used i
for the hydra
he ratio of PH
ion data and
or the WTP t
g facilities a
2007 to 201
the City
Based on ana
ctor is 2.2.
2010
Oct 5

1.66 0.75

2.2 ction data an
. Even so, th
ards which
ze [16]. The
s CDPH per
3, respective
WTP to
um day peak
ngels
Plan
mands
020401
mp.docx
in the
aulic
HD
to the
are
0 are
alysis
nd is
he
rmit
ely
king
Angels WM
July 2013
b. P
The PHD
diurnal d
records w
is 2,400 g
maximum
the recom
that spec
specify a

5.5 D
A water d
consisten
summariz
gpd/EWU
a. S
Existing
planning
existing c
Appendix
General P
develop a
in conjun
demand p
MP
eak Hour De
D factor is th
demand. PHD
were not ava
gpm (3.46 m
m day produ
mmended PH
ify a minimu
a PHD factor
Development
demand fact
ncy with the
zes conversi
U water dem
ummary of E
and future E
land uses ar
conversion f
x A. Future
Plan [1]. Exi
a water dem
nction with t
projections.
emand
he ratio of the
D is typically
ilable, but th
mgd) [6]. The
uction of 2.00
HD factor is
um PHD fac
r.
t of Water D
tor was deve
methodolog
ion factors o
mand factor.

Equivalent W
EWU conver
re summariz
factors is inc
conversion f
isting EWU
and factor o
the existing a
e highest hou
y met by util
he estimated
e ratio of the
0 mgd in 200

1.7 which is
ctor of 1.5 [1
Demand Fa
eloped on the
gy used in th
of EWU/ac fo
Water Unit C
rsion factors
zed in Table
cluded as an
factors are b
conversion
n the basis o
and future E
Chapter 5:
5-15
n:\m
urly demand
lizing water
d PHD during
e estimated P
08 (per Tabl
s consistent w
0]. The City
actor
e basis of an
e City Waste
or the differe
Conversion F
for resident
5-12. The de
excerpt from
ased on proj
factors prese
of an EWU.

WU convers
Existing an
mtb020401\docume
d to the MDD
in water sto
g the summe
PHD of 2,40
le 5-11) is 1.
with Califor
y 2010 Impro
n equivalent w
ewater Mast
ent land uses
Factors
tial, commer
etailed analy
m the City W
jected land u
ented in Tab
The water d
sion factors
Wa
nd Projected
ents\_water master
D and repres
orage facilitie
er based on p
00 gpm (3.46
.7. Based on
rnia Waterwo
ovement Sta
water unit (E
ter Plan [18]
s and an app
rcial, public,
ysis for deve
Wastewater M
use densities
ble 5-12 were
demand facto
to estimate f
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
sents the gre
es. Hourly m
previous stud
6 mgd) to the
n this calcula
orks Standar
andards do n
EWU) for
]. This sectio
propriate
and special
elopment of t
Master Plan i
s presented in
e used to
or was then u
future water
ngels
Plan
mands
020401
mp.docx
eatest
meter
dies
e
ation,
rds
not
on
the
in
n the
used
r
City of Angels
Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-16 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 5-12

CITY OF ANGELS WATER MASTER PLAN

SUMMARY OF EWU CONVERSION FACTORS
Conversion Factora
(EWU/ac)
Land Use Existing Futureb
Residential
HDR 5.0 15.0
MDR 3.0 10.0
RE 2.0 0.5
SFR 4.0 6.0
HDR-WMC 9.5 9.5
Commercial
BAE 2.0 1.0
CC 2.0 15.0
HC 2.0 15.0
SC 2.0 15.0
Industrial
I 2.0 2.0
Public
P 5.0 5.0
P (WWTP)c

5.0 0.0
P-SCH 10.0 10.0
PR 4.0 4.0
Other
SP 1.5 1.5
a
Existing and future conversion factors from the City Wastewater Master Plan [18].

OS and ROW land uses are excluded from the table and the development of a water demand factor because no water demands are assumed for these land uses.

The PR-Golf land use is also excluded from the table because irrigation demands associated with GHC Golf Course were evaluated separately. b
Future conversion factors based on projected General Plan [1] densities. c
Water demands are not anticipated for future WWTP areas. Potential increases in water demands at the existing 18 ac WWTP site associated with future expansions are assumed to be met with Title 22 recycled water.

As shown in Table 5-12, future EWU conversion factors for RE and BAE are lower than existing EWU conversion factors. The existing EWU conversion factor for RE was based on an analysis of existing parcel sizes for areas with the RE land use designation [18]. The existing EWU conversion factor for BAE was based on an analysis of existing developed commercial parcel areas [18]. The future EWU conversion factors, including the factors for RE and BAE, are from the General Plan [1, 18].

Angels WM
July 2013
There are
the future
demands
water use
18 ac of W
associate
b. C
Using the

0.86 mgd
the value
MP
e approxima
e conversion
will be asso
ed at the WW
WWTP site.
ed with futur
Calculation o
e existing EW
d, a water de
es used to est
ately 18 ac de
n factor for P
ociated with
WTP is accou
. Potential in
re expansion
of Water Dem
WU/ac conv
emand factor
timate the ap
eveloped and
P (WWTP) i
the future 24
unted for in
ncreases in w
s are assume
mand Factor
version facto
r in terms of
ppropriate w
Chapter 5:
5-17
n:\m
d 248 ac vac
s 0.0 EWU/a
48 ac at the
the water de
water demand
ed to be met
rs and the 20
f gpd/EWU w
water demand
Existing an
mtb020401\docume
cant at the W
ac based on
WWTP site
emands asso
ds at the exi
t with Title 2
007-2012 av
was determin
d factor.

Wa
nd Projected
ents\_water master
WWTP site. I
the assumpt
. It is assum
ociated with
isting 18 acre
22 recycled w
verage day p
ned. Table 5
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
In Table 5-1
tion that no w
med that proc
the existing
e WWTP sit
water.
production of
5-13 summar
ngels
Plan
mands
020401
mp.docx
2,
water
ess
te
f
rizes
City of Angels
Water Master Plan
Chapter 5: Existing and Projected Water Demands
Angels WMP 5-18 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 5-13

CITY OF ANGELS WATER MASTER PLAN

CALCULATION OF WATER DEMAND FACTOR
Land Use
Total
Developed
Areaa
(ac)
Existing
Densityb
(EWU/ac)
Total
Existing
EWU
Residential
HDR 80 5.0 400
MDR 51 3.0 153
RE 14 2.0 28
SFR 372 4.0 1,488
HDR-WMC 21 9.5 200
Commercial
BAE 26 2.0 52
CC 65 2.0 130
HC 16 2.0 32
SC 32 2.0 64
Industrial
I 16 2.0 32
Public
P 28 5.0 140
P (WWTP) 18 5.0 90
P-SCH 50 10.0 500
PR 18 4.0 72
Other
SP 4 1.5 6
Total 811 3,387
Total Existing Productionc (gpd) 860,000
Water Demand Factor (gpd/EWU) (rounded) 255
a
See Table 5-2. Excludes ROW, OS, and PR-Golf.
b
Existing EWU conversion factor (see Table 5-12).
c
2007-2012 average day production (see Table 5-4).

A water demand factor of 255 gpd/EWU results from using the method described in this chapter.

It should be noted that the water demand factor is based on an EWU, not per capita or per dwelling unit, and is to be used only with the EWU conversion factors presented in Table 5-12.

For context, there are a total of 1,769 existing water meter connections in the City and a total of 3,387 existing EWUs as calculated in Table 5-13. The number of water meters is not comparable to the number of EWUs.

Angels WM
July 2013
c. C
A compa
presented
with the
residentia
of 586,00
CO
d. R
A water d
projectio
factor is b
EWU con
designed
Section 5
Selection
and distri
overestim
increase
Converse
MP
Comparison o
arison of esti
d in Table 5-
existing EW
al demand o
00 gpd.

OMPARISON
Residential
Use
HDR
MDR
RE
SFR

HDR-WMC
Total Estimat
Total Actual R
Percent Differ
a
See Table 5-2.
b
Existing EWU
c
2007-2011 ave
revenue water
Review of Re
demand fact
ns of future
based on an
nversion fac
d to mimic w

5.3-d, Non-R
n of a water d
ibution syste
mation of pro
capacity of s
ely the use o
of Estimated
imated reside
-14. As show
WU conversio
f 579,000 gp
CITY

N OF ESTIMA
l
Total
Develope
Areaa (a
80 51
14 372
21 ted Residentia
Residential Wat
rence
U conversion fact
erage metered w
(see Table 5-9).
ecommended
tor of 255 gp
water deman
EWU, not p
ctors presente
water product
Revenue Wat
demand fact
em. Use of a
ojected wate
supply, treat
of a lower tha
d Versus Act
ential water
wn in Table 5
on factors pr
pd, within 1.

TA

Y OF ANGELS

ATED VERSU
ed
c)
Conversi
Factorb
(EWU/a
5 3
2 4
10 al Water Dem
ter Demand, A

tor (see Table 5-
ater usage for sin
d Water Dem
pd/EWU is r
nds. As men
per capita or
ed in Table 5
tion at the W
ter.
tor is a critic
a greater than
er demands; i
tment, and d
an appropria
Chapter 5:
5-19
n:\m
tual Residen
demands to
5-14, a wate
rovided in Ta
.2 percent of
ABLE 5-14

S WATER MA

US ACTUAL
ion
b
ac)
Total
Existin
EWU
400
153
28 1,488
200
and (gpd)
Adjustedc (gpd)
-12).
ngle family and
mand Factor
ecommende
ntioned previ
per dwelling
5-12. The w
WTP includin
cal step in the
n appropriate
infrastructur
istribution sy
ate water dem
Existing an
mtb020401\docume
ntial Water D
actual mete
er demand fa
able 5-12, pr
f the “target”

ASTER PLAN

RESIDENTIA
ng
Wate
Dema
Facto
(gpd/EW
255
255
255
255
255
)

multi-family res
ed for master
iously, the re
g unit, and i
water demand
ng non-reven
e hydraulic e
e water dem
re oversizing
ystems earli
mand factor
Wa
nd Projected
ents\_water master
Demands
red residenti
actor of 255
roduces a tot
” residential
N

AL WATER D
er
nd
or
WU)
Est
W
De
(
sidential adjuste
r planning pu
ecommende
s to be used
d factor of 25
nue water as
evaluation o
mand factor w
g; or schedul
ier than nece
could result
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
ial water usa
gpd/EWU, a
tal estimated
water dema

DEMANDS
imated
Water
emand
gpd)
102,000
39,000
7,100
379,400
50,900
579,000
586,000
-1.2%
ed for nonurposes and
ed water dem
only with th
55 gpd/EWU
described in
of the treatme
will result in
ling projects
essary.
t in lower wa
ngels
Plan
mands
020401
mp.docx
age is
along
d
and
mand
he
U is
n
ent
s to
ater
Angels WM
July 2013
demand p
supply, tr

5.6 P
Future w
assumed
conjuncti
(EWU/ac
densities
Base yea
below.
a. B
The base
3,387 EW
factor of
demands
b. P
Average
from 1.80
ranging f
on the gr

2.16 perc
is consist
A base y
populatio
c. P
The total
provided
Table 5-1
for projec
populatio
buildout
are includ
(1,600 A
in the yea
MP
projections;
reatment, an
Projection of
water demand
growth rate
ion with a ba
c) for future
in the Gene
ar water dem
Base Year
e year for wa
WUs represe
255 gpd/EW
by land use
rojected Gro
annual grow
0 to 2.52 per
from 0.13 to
rowth rates p
cent is recom
tent with the
ear 2011 pop
on of 3,836 [
rojection of
l EWUs for b
d in Table 5-3

12. The 2.16
ctions of 10-
on; developm
conditions a
ded in Appe
AFY less 319
ar 2024.
infrastructur
nd distributio
f Future Wa
ds were proje
and water d
ase-year wat
developmen
eral Plan [1].
mands, projec
ater demand
nting existin
WU, the base
e type is prov
owth
wth rates pre
rcent. Observ

1.23 percen
presented in t
mmended for
e City Waste
pulation of 3
[17, 18] and
10-Year, 20
buildout con
3 combined
6 percent ave
-year and 20
ment (EWUs
are provided
endix C. As s
AFY histor
re undersizin
on system pr
ater Deman
ected for 10-
demand facto
ter demand f
nt, presented

cted growth,
calculations
ng developm
e year ADD
vided in App
sented in the
ved growth r
nt, as reporte
the General
r future grow
ewater Maste
3,919 was de
a mid-range
0-Year, and B
nditions were
with existin
erage annual
0-year EWUs
s); and water
in Table 5-1
shown in Ta
rical maximu
Chapter 5:
5-20
n:\m
ng; and disco
rojects to add
nds
-year, 20-yea
or of 255 gpd
for existing d
d previously
and future e
s is 2011. Fo
ment as show
is 864,000 g
pendix B.
e Land Use E
rates from 2
ed by the Cal
Plan [1], a m
wth projectio
er Plan [18].
etermined us
e annual grow
Buildout Wa
e calculated
g and future
l growth rate
s and water
r demand pro

15. Detailed
able 5-15, the
um demand f
Existing an
mtb020401\docume
onnects in sc
dress capacit
ar, and build
d/EWU for f
developmen
in Table 5-1
estimated wa
r the 2011 b
wn in Table 5
gpd. A break
Element of t
2008-2010 ha
lifornia Dep
mid-range an
ons. The 2.16
sing the publ
wth rate of 2
ater Demand
based on bu
e EWU/ac co
e was applied
demands. Es
ojections for
water dema
e available w
for GHC Go
Wa
nd Projected
ents\_water master
cheduling ap
ty shortfalls
dout conditio
future develo
nt. Conversio
12, were base
ater demands
base year, the
5-13. With a
kdown of the
the General P
ave been sig
artment of F
nnual growth
6 percent ann
lished 2010

2.16 percent
ds
uildout land u
onversion fac
d uniformly
stimated Cit
r 10-year, 20
and projectio
water supply
olf Course) w
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
ppropriate
.
ons using an
opment in
on factors
ed on land u
s are discuss
ere are a tota
water dema
e base year w
Plan [1] vary
gnificantly lo
Finance. Bas
h rate of
nual growth
census
.
use areas
ctors provid
to each land
ty-wide
0-year, and
on calculatio
y of 1,281 AF
will be excee
ngels
Plan
mands
020401
mp.docx
n
use
sed
al of
nd
water
y
ower,
ed
rate
ed in
d use
ns
FY
eded
Angels WM
July 2013
Proj
Base Ye
10-year P
20-year P
Buildout
a Populati
b Percent
c Availabl
exceede
d. P
Water de
Table 5-1
fails to pr
take their
GHC Go
recycled
GHC Go
irrigation
diversion
(319 AF)
MP
PROJE
jection (Year)
ar (2011)
Projection (202
Projection (203
t (2052)
ion and EWU pr
of buildout base
le supply of 1,28
d in the year 202
rojection of
emand projec

16. A worst
roduce recla
r entire supp
olf Course is
water delive
olf Course is
n demand rec
n and recycle
).

CITY

ECTED POPU
Popula
3,91
21) 4,85
31) 6,00
9,45
rojections using a
ed on existing an
81 AFY (1,600 A

24. Water Dem
ctions includ
case scenari
aimed water
ply from Ang

86.0 MG (2
eries. For fut
assumed at
corded for G
ed water deli
TA

Y OF ANGELS

ULATION, DE
tiona
Total
EWUa
9 3,387
53 4,194
09 5,193
53 8,170
a 2.16% growth
nd/or projected E
AFY less 319 AF
ands Includi
ding GHC G
io is assumed
meeting Titl
gels Creek. F
264 AF) base
ture water de
this maximu
GHC Golf Co
ivery for irri
Chapter 5:
5-21
n:\m
ABLE 5-15

S WATER MA

EVELOPMEN
a
Percent of
Buildoutb
41%
51%
64%
100%
rate.

EWU relative to
FY historical ma
ing Greenho
Golf Course i
d for water d
le 22 Standa
For the base
ed on the 200
emand proje
um historical
ourse occurr
igation of GH
Existing an
mtb020401\docume

ASTER PLAN

NT, AND WAT
f
b
Projecte
(gpd
864,0
1,069,
1,324,
2,084,
total buildout EW
aximum demand
orn Creek Go
irrigation dem
demand proj
ards and GH
year, the an
09-2011 ave
ections, the a
l value. Hist
red in 2012.

HC Golf Co
Wa
nd Projected
ents\_water master
N

TER DEMAN
d ADD
d)
P
(
000
,000
,000
,000
WU.
d for GHC Golf C
olf Course
mands are su
ections in w
C Golf Cour
nnual irrigati
erages for su
annual irriga
torically, the
The combin
ourse in 2012
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
NDS
Projected Annu
Demandc
(MG) (A
315 96
390 1,1
483 1,4
761 2,3
Course) will be
ummarized i
which the WW
rse is entitle
on demand f
urface water
ation demand
e largest
ned surface w
2 was 104 M
ngels
Plan
mands
020401
mp.docx
ual
AF)
67 97
482
336
in
WTP
d to
for
and
d for
water
MG
Angels WM
July 2013
Proje
Base Year
10-year Pr
20-year Pr
Buildout (
a See Table
b 2009-2011

31.0 MG (
c
2012 GHC
recycled w
d
Available

5.7 C
Using his
chapter d
water dem
supply, tr
Critical a
projectio

1. E

2. E
MP
GHC
ection (Year)
r (2011)
rojection (2021
rojection (2031
(2052)
5-15.
1 average GHC G
(95 AF) of recyc
C Golf Course ir
water (Section 5.
supply of 1,600
Conclusions
storical wate
documents a
mand factor
reatment, an
assumptions
ns include:

EWU densitie
EWU relation
CITY
WATER

C GOLF COU
Project
Citya
315
1) 390
1) 483
761
Golf Course irrig
cled water (Secti
rrigation demand
.3).
0 AFY will be ex
er production
recommend
and peaking
nd distributio
which affec
es used for p
nships used f
TA

Y OF ANGELS

R DEMAND P

URSE SURFA
ted Annual De
a
GHC G
Cour
86b
104c
104c
104c
gation demand i
ion 5.3).
d is 53.6 MG (16
xceeded in the ye
n, consumpti
ded water dem
g factors are
on system ca
ct the calcula
particular lan
for non-resid
Chapter 5:
5-22
n:\m
ABLE 5-16

S WATER MA

PROJECTION

ACE WATER
emand (MG/y
Golf
rse Tota
401
c
494
c
587
c
865
is 55.0 MG (169
65 AF) of surfac
ear 2024.
ion data, and
mand factor
used to proj
apacity requi
ated water de
nd uses (e.g.
dential land
Existing an
mtb020401\docume

ASTER PLAN

NS INCLUDI

IRRIGATION
year) Pr
al C
1 9
4 1
7 1
5 2
9 AF) of surface
ce water from An
d EWU estim
r of 255 gpd/
ject MDD an
irements.
emand factor
, the number
uses.

Wa
nd Projected
ents\_water master
N
ING

N DEMANDS
rojected Annu
Citya
GHC
Co
967 2
,197 3
,482 3
,336 3
e water from Ang
ngels Creek and
mates for the
/EWU. The r
nd PHD for
r and future
r of EWUs p
City of A
Water Master
d Water Dem
MTB0
r plan\final\0713 m
S
ual Demand (A
C Golf
ourse To
264b 1,
319c 1,
319c 1,
319c 2,
gels Creek and

50.1 MG (154 A
e City, this
recommende
evaluation o
water dema
per ac).
ngels
Plan
mands
020401
mp.docx
AFY)
otald
,231
,516
,801
,655
AF) of
ed
of the
and
Angels WM
July 2013
6Cu
This chap
(County)

6.1 O
The histo
influx of
productio
the Stani
by the Ci
the area (

6.2 H
In 1848,
Gold min
wash gol
industry.
reliable a
Gold min
mules to
were also
construct
supply an
straddled
lumber p
construct
intricate
The follo
present. A
and distri
described
prepared
a. U
In 1852,
working
UWC loo
MP
urrent
pter presents
) and provide
Overview
ory of water
f people com
on of power,
slaus River a
ity. To under
(watershed)
History of W
the town of
ning was eas
ld from the g
In addition,
and adequate
ners were em
bring water
o constructed
tion of the fl
nd built a wa
d the creek; a
produced at t
tion sites dow
water delive
owing paragr
A series of w
ibute water a
d. A schema
by the UPA
Union Water
the Union W
to tap the lo
oked beyond
and F
s the history
es a discussi
supply in th
ming to seek t
, and the pot
and multiple
rstand the cu
will be revie
Water Supply
Murphys (T
sier in the rai
gravels. Wat
, to support t
e water supp
mployed to b
to where it w
d. In the beg
lumes. The m
ater-powered
and because
he mill coul
wnstream. T
ery system w
raphs provid
water and po
and power th
tic of the ma
A and is prov
Company
Water Compa
cal watershe
d the local w
Future
and agreem
ion of alterna
he County is
their fortune
table water u
e tributaries
urrent water
ewed.
y Developm
Town) and th
iny season b
er was also n
the growing
ly.
build a series
was needed
ginning, a saw
miners took a
d sawmill ju
it was at the
d easily floa
Thus, out of n
was created u
de a brief his
ower compan
hroughout th
ajor facilities
vided in App
any (UWC)
ed of Angels
watershed to t
6-1
n:\m
Water
ments governi
ate water sup
entwined wi
e. Water was
uses of the gr
are the key s
supply avail
ment
he surroundin
because runo
needed to po
population,
s of flumes a
most. Event
wmill was n
advantage o
st downstrea
e high end of
at down the c
need for the
upstream of t
story of the w
nies and utili
he watershed
s along the w
endix D.
was formed
s Creek and t
the North Fo
mtb020401\docume
r Supp
ing water su
pply strategi
ith the gold
s needed for
rowing popu
sources of w
lable, the his
ng area was
off in the wat
ower the too
there becam
and ditches w
tually, severa
needed to pro
f the natural
am from the
f the water c
constructed f
support of t
the Town.
water supply
ity districts h
d and each o
watershed up
by two com
the Mill Cre
ork of the St
ents\_water master
plies
upplies in Ca
ies for the C
mining indu
the mining o
ulation. The
water delivere
story of wate
inundated w
tershed was
ls used in th
me a critical n
with picks, sh
al small dam
oduce lumbe
l energy that
head of the
conveyance s
flumes and c
the gold min
y dating from
have been fo
f the key ent
pstream of th
mpanies that
eek. Shortly
anislaus Riv
MTB0
r plan\final\0713 m
alaveras Cou
ity.
ustry and the
of gold, the
North Fork
ed to and uti
er resources
with gold see
available to
he mining
need for a
hovels, and
ms and reserv
er for
t the water w
flume. The
system, the
canals to
ning industry
m 1852 to the
ormed to con
tities is
he City was
were already
after, in 185
ver.
020401
mp.docx
unty
e
of
ilized
in
ekers.
voirs
would
mill
y, an
e
nvey
y
54,
Angels WM
July 2013
The long
in 1858.
which ha
Stanislau
the one u
gravity fl
the mines
b. U
The Utic
mining c
expanded
UGMC p
penstock
where the
stamp mi
Expansio
watershe
In 1895,
first elect
This plan
replacing
County. I
built wes
The stone
When the
converted
construct
The next
1903-190
was comp
Half of th
PG&E.

Although
had beco
sold to a
MP
g dry summe
Also at this
ad built a rou
us River. The
used by the U
low from Mc
s. The Lowe
Utica Gold M
a Gold Mini
ompany acq
d and improv
put its water
ks from what
e pressure of
ills that proc
on of the wat
d by creatin
UGMC con
tricity to the
nt provided e
g power from
It is said tha
st of the Roc
e powerhous
e Utica Mine
d into a ‘‘tem
ted in 1940-
significant c

06. The final
pleted in 192
he UGMC w
h built to fac
ome an impo
power entity
rs limited th
time, the UW
ughly paralle
e ditch, know
UWC. Gold m
cKays Dam
er Utica Can
Mining Comp
ing Company
quired UWC
ved the wate
to work run
t is now the A
f falling wat
cessed the or
ter system in
g Lake Alpin
structed a sm
e Utica mine
electricity to
m the Angels
t this powerh
ky Mountain
se had a gen
e closed in 1
mporary’’ el
1941.
construction
l reservoir co

29. was owned by
cilitate the m
rtant source
y, residents o
he water flow
WC acquired
el ditch from
wn as the Up
miners built
through the
al delivers w
pany
y (UGMC) o
in the late 1
er system to
nning the hea
Angels Fore
ter was harne
re [24].
ncluded prov
ne in 1889-1
mall experim
. The same y
o mines, mill
s Camp pow
house was th
ns. In 1899,
erator power
1918, an air c
lectric genera
n on the Nort
onstructed b
y Emma Ro
mining indust
of water for
of the Murph
Chapter
6-2
N:\MTB0
ws in creeks,
d the Calave
m a diversion
pper Utica C
t the entire U
Upper Utica
water from H
owned some
880s. Over t
provide pow
avy machine
bay were run
essed to ope
viding additi
1892.
mental power
year, another
s, and reside
erhouse. It i
he fourth to b
the Utica Po
red by water
compressor
ator. It serve
th Fork of th
by the UGMC
se. When sh
try, the netw
r domestic u
hys area bec
r 6: Current
020401\Documen
so UWC co
ras County W
n point on the
Canal, was co
Utica flume a
a Canal to H
Hunter’s Res
e of the riche
the next sev
wer for the m
ery of industr
un to the min
erate air com
ional storage
r plant in An
r powerhous
ences of Ang
s touted to b
be built in C
owerhouse w
r delivered th
assembly in
ed until a new
he Stanislaus
C was at Spi
he died in 19
work of ditche
se and irriga
came concern
Wa
t and Future
nts\_Water Master
onstructed U
Water Comp
e North Fork
onsidered to
and canal sy
Hunter’s Res
ervoir to Mu
est mines in
veral decades
mining indust
rial mining.
nes at Angels
mpressors, ho
e on the uppe
ngels Camp t
se was built
gels Camp a
be the first po
California, an
was built eas
hough a pen
n Angels Cam
w Angels Po
s was the Uti
icer Meadow
946, the comp
es fed by the
ation. With U
ned about re
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
Union Reserv
pany (CCWC
k of the
be superior
stem to utiliz
ervoir and o
urphys.
the County.
s, UGMC
try.

The first
s Camp in 18
oists, and the
er end of the
to supply the
above Murp
and the Coun
ower in the
nd the eighth
st of Murphy
nstock.
mp was
owerhouse w
ica Reservoi
w. The reserv
pany was so
e Utica syste
UGMC being
etaining their
ngels
Plan
pplies
020401
MP.docx
voir
C),
to
ze
on to
The
890
e
e
e
phys.
nty,
h
ys.
was
ir in
voir
old to
em
g
r
Angels WM
July 2013
water sup
agreemen
to the pre
c. U
The UPU
CWUA.

To this d
and a raw
water to t
water is d
d. P
PG&E pu
This incl
ditches a
The PG&
Commiss

1. U
(A
N
R
w

2. T
D
d
F
m
In
an
e. C
CCWD w
Stanislau
new dive
pipeline (
MP
pply. They o
nt for the rig
esent-day Un
Union Public
UD was form
day, UPUD i
w water syste
the commun
delivered thr
acific Gas &
urchased the
uded replace
nd flumes.
&E system w
sion (FERC)
Utica Project
Alpine, Unio
North Fork of
Reservoir on
with diversion
The Angels P
Diversion Da
iversion, wa
orebay and t
made to the D
n 1997, PG&
nd Angels pr
Calaveras Co
was formed i
us River Hyd
ersion from t
(Collierville
organized the
ght to purcha
nion Public U
Utility Dist
med in 1946.
s an active p
em, are main
nities of Mur
rough ditche
& Electric
e UGMC in
ement of the
was covered b
). These faci
– FERC No
on, Utica, an
f the Stanisla
Mill Creek.
ns into UPU
Project – FER
am about thre
ater flows do
then to the A
Dogtown Dit
&E transferre
rojects to the
ounty Water
in 1946. By
droelectric D
the North Fo
e Tunnel) div
e Calaveras W
ase water fro
Utility Distr
trict
In 1961, UP
purveyor of w
ntained by U
rphys, Dougl
es to the sam
1946 and pro
e Utica Powe
by two licen
ilities are inc
o. 2019: The
nd Spicer Me
aus River, an
The Lower
UD’s ditches,
RC No. 2699
ee miles dow
own the Ang
Angels Powe
tch and other
ed by deed a
e UPA [24].

District
the mid-198
Development
ork of the Sta
verts water to
Chapter
6-3
N:\MTB0
Water Users
om the Utica
ict (UPUD).

PUD acquire
water. Two s
UPUD. The d
las Flat, Val
me areas for ir
oceeded to m
erhouse in 19
nses issued b
cluded under
Utica Projec
eadow), the d
nd the Uppe
Utica Canal
, as well as t
9: The Ange
wnstream fro
els Canal thr
erhouse. Add
r small users
and bill of sa
80s, CCWD
t Project, FE
anislaus Riv
o generate el
r 6: Current
020401\Documen
s Association
system. The
.
ed all assets
separate syst
domestic sys
llecito and C
rrigation.
modernize an
953-1954 an
by the Federa
r each of the
ct includes t
diversion da
er Utica Cana
l carries wate
to private use
els Project be
om the Murp
rough Ross
ditional dive
s and to the C
ale all the ass
began work
ERC No. 240
er was const
lectricity at
Wa
t and Future
nts\_Water Master
n (CWUA) a
e CWUA is
and liabilitie
tems, a treat
stem treats an
Carson Hill. U
nd upgrade t
nd upgrades
al Energy Re
e licenses list
the four uppe
am at McKay
al from McK
er to the Uti
ers along the
egins at the A
phys Afterba
Reservoir to
ersions from
City WTP.
sets and righ
k on the Nort

09. As part o
tructed. This
Collierville
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
and secured
the predeces
es from the
ted water sys
nd supplies
Untreated or
the Utica sys
to the miles
egulatory
ted below.
er reservoirs
ys Point on t
Kays to Hunt
ca Powerhou
e canal.

Angels
ay. From the
o the Angels
the canal ar
hts of the Uti
th Fork
of this projec
s large diame
Powerhouse
ngels
Plan
pplies
020401
MP.docx
an
ssor
stem
r raw
stem.
of
s
the
ter’s
use,
e
re
ica
ct, a
eter
e and
Angels WM
July 2013
bypasses
water for
the CCW
Accordin
approxim
districts t
f. N
NCPA w
power, an
Members
and other
managem
NCPA is

1. N
is
S
sm
ca
m
d
C
p
M
A
T
se
C
R
d

2. U
N
pr
U
S
MP
much of the
r CCWD. W
WD.
ng to the curr
mately 12,50
throughout t
Northern Cali
was establishe
nd to coordin
ship consists
r publicly-ow
ment of elect
s responsible
North Fork St
s a 259 mega
tanislaus, an
maller powe
apacity gene
major compo
iameter and
Collierville P
lant.

Major project
Alto, Rosevil
The Colliervi
ervice to the
Collierville T
Reservoir. UP
elivered thro
Upper Utica P
North Fork of
rojects were
Union, and U
tanislaus Riv
e Upper Utic
Water is transf
rent CCWD
0 municipal
the County.”
ifornia Powe
ed in 1968 to
nate and ma
s primarily o
wned entitie
trical energy
e for operatin
tanislaus Riv
awatt (MW)
nd Tuolumne
erhouses. Thi
erated during
nent of the p
8 miles long
Powerhouse o
t participants
lle, and Lodi
ille Tunnel e
Utica system
Tunnel to a re
PA’s pre-19
ough the Tun
Project – FE
f the Stanisla
e purchased,
Utica, along w
ver water rig
ca Canal. By
ferred to the
website, the
and residen
”
er Agency
o build and o
anage wholes
of municipali
s interested i
[25].
ng the two F
ver Hydroele
project occu
e counties. T
is stated pow
g a wet year
project is the
g. The tunne
on the Stanis
s in the Coll
i.
eliminated an
m, a pressur
emaining po
14 water righ
nnel Tap to H
ERC No. 115
aus River, in
and NCPA t
with the old
ghts.

Chapter
6-4
N:\MTB0
y agreement,
Ebbetts Pas
e “District cu
ntial/commer
operate joint
sale power fo
ities, a rural
in the purch
ERC project
ectric Devel
upying 4,500
The project in
wer capacity
with the pla
e Collierville
el diverts wat
slaus River.
ierville Proj
n upper porti
rized pipe kn
ortion of the
hts allotmen
Hunter’s Re
563: This pro
n Tuolumne
took owners
Spicer Mead
r 6: Current
020401\Documen
, a tap on the
ss WTP whic
urrently prov
rcial custome
tly-owned po
for member c
electric coo
ase, aggrega
ts that are de
lopment Proj
0 ac in Alpin
ncludes a se
y is a maximu
ants being op
e Power Tun
ter from Mc
Collierville
ect are the c
ion of the Ut
nown as the T
Upper Utica
nt of 60 cubic
servoir acco
oject is locat
and Alpine
ship of the up
dow storage
Wa
t and Future
nts\_Water Master
e pipeline is
ch is owned
vides water
ers in four im
ower plants,
cities and dis
operative, irr
ation, schedu
escribed brie
ject – FERC
ne, Calavera
eries of dams
um project p
perated at ‘fu
nnel. The tun
cKays Point t
Powerhouse
cities of Sant
tica Canal. T
Tunnel Tap
a Canal at Hu
c feet per se
ording to a m
ted on Silver
counties. Fo
pper reservo
rights and N
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
the source o
and operate
service to
mprovement
, to purchase
stricts.
igation distr
uling, and
efly below.

C No. 2409: T
as, San Joaqu
s, tunnels, an
production
ull throttle.’
nnel is 18 ft i
to the
e is a 253 M
ta Clara, Pal
To maintain
connected th
unter’s
cond (cfs) is
monthly sche
r Creek and t
ormer PG&E
oirs, Lake Al
North Fork o
ngels
Plan
pplies
020401
MP.docx
of
ed by
t
e
ricts,
This
uin,
nd
A
in
MW
o
he
s
edule.
the
E
lpine,
of the
Angels WM
July 2013
T
P
g. C
The City
intimatel
interactio
Househo
1984 whe
h. U
The UPA

CCWD, U
governed
In 1995,
the PG&
ownershi
and addit
allotment
and NCP
In May o
remained
No. 2699
buy out C
As its nam
system d
Powerho
(Cal ISO
renewabl
through t
certified
utilities a
resources
and impr
MP
The remainde
owerhouse,
City of Angel
is located at
ly entwined w
ons upstream
lds and busi
en the munic
Utica Power A
A was formed
UPUD, and
d by a board
CCWD neg
E projects o
ip of Lake A
tional North
ts for North
PA. UPA reta
of 1997, CCW
d a member o
9 (Angels) w
CCWD, and
me suggests
eveloped by
use generate
O) and is tran
le by the Cal
the Western
“green powe
across Califo
s. UPA’s gre
roving the U
er of the PG&
was transfer
ls
t the furthest
with all of th
m.
inesses in the
cipal water s
Authority
d as a joint p
the City, thu
comprised o
otiated and s
n the Utica s
Alpine, Union
Fork of the
Fork of the
ained all PG
WD granted
of the entity
were issued to
CCWD with
s, UPA is als
y the UGMC
e electricity t
nsmitted out t
lifornia Ener
Renewable
er,” UPA is
ornia increas
een power re
PA water an
&E projects,
rred to the ne
t downstream
he gold mini
e City purch
system was f
power author
us establishin
of representa
signed a sett
system and N
n, and Utica
Stanislaus R
Stanislaus a
G&E rights on
all water rig
. New licens
o UPA in 20
hdrew from
so in the busi
and PG&E.
that is meter
to the grid. T
rgy Commis
Energy Gen
eligible for g
se their use o
evenues help
nd power sys
Chapter
6-5
N:\MTB0
, from the Tu
ewly formed
m point of th
ing activities
hased their w
formed.
rity in Decem
ng local own
atives from t
tlement agre
NCPA woul
reservoirs, t
River water r
and Mill Cree
n Angels Cr
ghts, propert
ses for FERC
003. On July
UPA.
iness of hyd
. The Murph
red by the Ca
The energy p
ssion and qua
neration Infor
green energy
of environme
p pay for mu
stem.
r 6: Current
020401\Documen
unnel Tap th
d UPA.
he Utica syst
s, and the wa
water directly
mber 1995.
nership of th
the member
ement with N
d share in th
the old Spice
rights. A sch
ek deliveries
reek and Fren
ties, facilitie
C projects N
y 1, 2004, the
droelectric ge
hys Powerho
alifornia Ind
produced is
alifies for “g
rmation Sys
y tickets for
entally-frien
uch of the co
Wa
t and Future
nts\_Water Master
hrough the A
tem. The Cit
ater and pow
y from the U
Member age
he water supp
agencies.

NCPA. CCW
he cost. NCP
er Meadow
hedule of mo
s was negoti
nch Gulch.
s, and contra
No. 2019 (Uti
e City and U
eneration, op
ouse and the
dependent Sy
certified 100
green energy
stem. As a pr
its electrica
ndly, renewab
st of operati
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
Angels
ty’s history i
wer supply
Utica system
encies includ
ply. UPA is
WD purchas
PA took
storage right
onthly water
iated by CCW
acts to UPA,
ica) and
UPUD agreed
perating the
Angels
ystem Opera
0 percent
y” purchase
roducer of
l output as
ble energy
ng, maintain
ngels
Plan
pplies
020401
MP.docx
is
until
ded
ed
ts,
r
WD
, but
d to
ator
ning,
Angels WM
July 2013
i. W
S
The gold
elevation
Reservoi
continues
The Nort
the UPA
in Appen
map also
Powerho

6.3 W
The UPA
1996, CC
Stanislau
Utica and
but rema
The Tran

1. O

2. C
1 3. W
hy
Other key

1. C
n
se
cu

2. U
R
C
w
MP
Water Supply
ystem
d miners who
n gravity flow
ir and then th
s to take adv
th Fork of th
map titled U
ndix D. The m
o shows UPA
use.

Water Suppl
A was formed
CWD obtaine
us River, Ang
d Angels wa
ined an entit
nsfer Deed d
Ownership rig
CCWD’s inte
995 Restated
Water convey
ydroelectric
y points of th
CCWD agree
o longer nee
ervice areas
ustomers wi
Under the 199
Reservoir. CC
CCWD is lim
water operatio
y within the N
o built the Ut
w from McK
hrough the L
vantage of th
he Stanislaus
Utica Power
map shows f
A’s key wate
ly Agreeme
d in 1995 an
ed from PG&
gels Creek, a
ater systems
ty member u
dated May 1,
ghts in the fo
erest in the w
d Agreemen
yance ditche
powerhouse
he settlemen
ed to only div
eded by UPA
and/or at or
thin their ser
97 Transfer
CWD owns a
mited in acce
ons.

North Fork o
tica flume an
Kays Dam th
Lower Utica
hat system to
s River, Mill
r Authority M
facilities ow
er and power
nts
nd included m
&E the right
and French G
[26]. In 199
until 2004.
1997 transf
former PG&E
water deliver
nt (Attachme
es and faciliti
es.
nt agreement
vert water fr
A, City of An
above Ange
rvice areas.”
Deed from C
a pump stati
ss to and use
Chapter
6-6
N:\MTB0
of the Stanis
nd canal sys
hrough the U
Canal, there
o deliver wat
Creek, and
Major Facilit
wned and ope
r system, Mu
member agen
ts to divert a
Gulch that h
7, CCWD d
ferred the fol
E pre-1914 w
ry allotment
nt A can be
ies, and the A
t between CC
rom lower A
ngels, and U
els Powerhou
”

CCWD, UPA
ion near the b
e of the pum
r 6: Current
020401\Documen
slaus River,
stem took ad
Upper Utica C
eby avoiding
ter and to ge
Angels Cree
ties and Rela
erated by UP
urphys Powe
ncies CCWD
and use water
had historical
eeded facilit
llowing from
water rights.
defined by A
found in Ap
Angels and U
CWD and U
Angels Creek
UPUD to gen
use or to pro
A has exclus
base of Hun
mp station so
Wa
t and Future
nts\_Water Master
Mill Creek,
dvantage of t
Canal throug
g the need fo
enerate green
ek watershed
ated Project
PA, NCPA, a
erhouse, and
D, UPUD, an
r from North
lly been use
ties and wate
m CCWD to
.

Attachment
ppendix E).

Utica (Murp
UPA are as li
k and only af
nerate power
ovide water s
sive control
nter’s Reserv
as to not int
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
Angels Cree
the higher
gh Hunter’s
or pumping. U
n energy.
ds are shown
ts and provid
and CCWD.
d Angels
nd the City.
h Fork of the
d within the
er rights to U
UPA:

A to the
phys)
isted below.
fter the ‘‘wat
r within their
service to
of Hunter’s
voir Dam.
terfere with U
ngels
Plan
pplies
020401
MP.docx
ek
UPA
n on
ded
The
In
e
UPA,
ter is
r
UPA
City of Angels
Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-7 MTB020401
July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx

3. The settlement agreement clarifies issues relating to the ownership and operation of CCWD-owned/NCPA-operated facilities, UPA owned and operated facilities, and physical access to those respective facilities.

4. Neither party can, without prior written consent, use or occupy any property nor facilities owned by the other party, nor apply for a grant or loan that would require use of the other party’s water rights or facilities [26].

Because of CCWD’s contracts with NCPA, the water available for use within the Ebbetts PassMurphys-Angels area is limited to the following:

1. The water UPA is contractually entitled to under Attachment A. The water is supplied by NCPA but the entitlement is based upon UPA’s pre-1914 water rights in the North Fork of the Stanislaus River-Mill Creek-Angels Creek system.

2. The maximum volume of 8,000 AF that CCWD is allowed to divert for consumptive purposes from the North Fork of the Stanislaus River system is subject to the following restrictions:
a. The water must be diverted “from points upstream of the existing Mill Creek Tap butterfly valve” and CCWD cannot “cause this water to directly or indirectly enter any of the PG&E Project facilities without prior written agreement from NCPA.” b. Under State Water Resources Control Board (SWRCB) Order No. 97-05 issued in September 1997, CCWD has until December 1, 2015, to put the entire 8,000 AFY to full beneficial use. Failure to do so could result in a partial revocation of CCWD’s SWRCB water rights permits; i.e., that portion of the 8,000 AF not put to full beneficial use by December 1, 2015 … “Use It or Lose It” [27].

Because of the above 2015 permit deadline, CCWD and UPA agreed in the November 2009 settlement agreement to use their best efforts to negotiate an agreement by December 31, 2014, for CCWD to transfer water to UPA for consumptive use in the UPA, City, and/or UPUD service areas. The settlement agreement does not identify the amount of water to be transferred but it could be approximately 4,000 to 5,000 AFY. Such water would be in addition to the water delivered to UPA under Attachment A, which is further defined in the following sections [27].

In 1985, CCWD entered into a Revised Power Purchase Contract and the 1995 Restated Agreement with the NCPA wherein CCWD gave control of most of the water in the North Fork of the Stanislaus River system to NCPA for power generation at the Collierville Powerhouse.

Excerpts from the Asset Sale Agreement By and Between PG&E and Calaveras County Water District, August 18, 1995 and the Assignment and Assumption Agreement between CCWD and UPA are included as Appendix F.

Angels WM
July 2013

6.4 A
Historica
Fork of th
reservoir
Canal. A
28 cfs of
were dee
60 cfs, U
UPA is c
Attachme
combined
May 1 fo
from wet
allocation
year; ther
Appendix
As menti
years and
firm agre
allotment
It should
deliverie
1995 Am
accuratel
UPUD.

UPA has
the origin
for dome
diversion
miners-in
1,000 AF

6.5 A
As discu
adequate
The UPA
and deliv
MP
Available Su
al water right
he Stanislau
rs; and senior
As a result of
f PG&E’s his
eded to UPA
UPA only rec
contractually
ent A is a sc
d flow of the
orecast of tot
t to driest ye
n each year o
refore, the a
x E.
ioned previo
d decreasing
eement to rec
t under Atta
d be noted, ho
s to UPA an
mended and R
ly reflect the
s assumed th
nal assumed
estic and irrig
ns to UPUD
nch. Pursuan
FY at $15.00
Alternate W
ssed previou
quantities o
A is restricted
very restricti
urface Wate
ts for the Ut
us River, Bea
r rights to th
the 1995 Am
storical 88 c
and is deliv
ceives 46 cfs
y entitled to r
hedule of m
e Mill Creek
tal unimpaire
ars are defin
on May 1. F
llocation is 2
ously, the ent
g in steps to a
ceive 1,600 A
chment A.
owever, that
nd the memb
Restated Agr
e reality of th
e previous P
agreement w
gation water
for domestic
nt to that pre
0 per AF [28
ater Suppli
usly, the City
of water to th
d in volumes
ons due to A
er Supplies
tica System i
aver Creek, a
he flow of An
mended and
fs water righ
vered through
s in the wette
receive the v
maximum del
k Tap and M
ed runoff in
ned in the tab
For example,
26,830 AF. T
titled volum
a volume of
AFY, and th
t during a ve
er agencies.
reement betw
he decreasing
PG&E contra
with a subse
r supply at no
c and irrigati
vious contra
].
es
y is complete
he Angels Fo
s of water th
Attachment A
Chapter
6-8
N:\MTB0
included 88
and Mill Cre
ngels Creek
Restated Ag
hts were con
h the Tunnel
est year.
volume of wa
ivery of wat
ill Creek. Th
the Stanislau
ble. DWR m
May 1, 201
The Amende
e is a maxim
16,107 AF i
his amount h
ery dry year t
The existing
ween NCPA
g water deliv
acts that wer
equent amend
o charge unt
ion water su
act with PG&
ely dependen
orebay for tr
hat can be de
A. During ve
r 6: Current
020401\Documen
cfs of the co
eek; the righ
sufficient to
greement bet
nveyed to NC
l Tap. Altho
ater as outlin
ter to the Uti
he deliveries
us River. Th
makes the det
2, was defin
ed Attachme
mum of 33,5
in the driest
has not been
there is the p
g contracts w
A, CCWD, an
veries in dry
re with UPU
dment, the C
til further mo
upply cannot
&E, UPUD c
nt on the abi
reatment and
elivered base
ery dry years
Wa
t and Future
nts\_Water Master
ombined flow
ht to store wa
o fully suppl
tween NCPA
CPA. The rem
ough the wate
ned under A
ica/Angels p
s are based o
he six steps o
termination
ned to be a L
ent A table is
14 AF in nor
water years.
reduced reg
possibility o
were written
nd UPA and
y years to the
UD and the C
City can rece
odified. The
t exceed 6.75
can obtain an
ility of UPA
d distribution
ed on multip
s, delivery o
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
w of the Nor
ater in the up
ly the Angels
A and CCW
maining 60
er rights are
Attachment A
project from
on the DWR
of reduced fl
of the level
Level III wat
s provided in
rmal to wett
. The City ha
gardless of th
f reduced wa
n prior to the
d therefore do
e City and
City. Pursuan
eive 1,600 A
e combined
5 cfs at $0.05
n additional
A to deliver
n.
le agreemen
f supplies ca
ngels
Plan
pplies
020401
MP.docx
rth
pper
s
D,
cfs
A.
the
low
of
ter
n
test
as a
he
ater
o not
nt to
AFY
5 per
nts
an be
Angels WM
July 2013
reduced t
disrupt th
3,000 ft o
Because
emergenc
A discus
reduction
non-pota
a. G
An altern
or more w
Groundw
flows hav
Formatio
Bear Mo
gold min
movemen
To furthe
conducte
Appendix
(see Figu

1. P
pr
li
p
m
ov
D
in

2. P
th
w
an
S
re
y
MP
to 52 percen
he City wate
of the woode
of these pos
cy use only o
sion of altern
n in surface w
able demands
Groundwater
nate water su
wells to pum
water flow in
ve been foun
ons and throu
untain and M
nes are presen
nt. Review o
er assess con
ed by Dunn E
x G. Based o
ure 6-1). Eac
otential Wel
revious test
ikely high-yi
otential. Wa
meet the wate
ver three we
DWR well lo
nvestigations
otential Wel
he tertiary gr
water quality
nticipated to
ite A (Area
eference, one
ield.
nt of normal.
er supply. As
en flume.
ssibilities, the
or for supple
nate water su
water divisio
s.
upply to the
mp groundwa
n the area of
nd in some o
ugh natural s
Melones Fau
nt in the area
of the area in
nceptually th
Environment
on this “desk
ch is describe
ll Site A (Ar
well investig
ielding area.
ater quality c
er supply sho
ell completio
g search, the
s, if possible
ll Site B (Ar
ravels and lim
concerns m
o be significa
1). To meet
e well was id
In addition,
s an example
e City is inv
ementing dem
upplies follo
ons to GHC
current surfa
ater into the
the City is p
of the alluvia
streams. Reg
ult zones and
a that may si
ndicates a lim
his alternativ
tal (DE). Th
ktop” evalua
ed below.
rea 1) – This
gations, incl
Fractured b
concerns are
ortfall and b
ons may be n
e well site sh
e.
rea 3) – This
mestone pac
may be identif
antly higher
the water su
dentified dur
Chapter
6-9
N:\MTB0
, problems w
e, in 2001 th
vestigating al
mands.
ows below in
Golf Course
ace water su
City’s water
primarily rela
al units of th
gional faults
d the Calaver
ignificantly
mited numbe
ve, an initial h
he results of t
ation, three p
s potential w
uding test w
bedrock cond
not anticipa
ased upon th
necessary. B
hould be loca
potential w
ckage. Yield
fied. Produc
and may req
upply short f
ring the DW
r 6: Current
020401\Documen
with the trans
he Darby Fire
lternate wate
ncluding gro
e, and use of
upply would
r system.
ated to flow
e Valley Spr
are located
ras Shoo-Fly
influence gr
er of monitor
hydrogeolog
the investiga
potential wel
well site area
wells and pas
ditions, howe
ated other tha
he reported r
ased on high
ated to the e
ell site comb
ds are anticip
ction capacity
quire fewer w
fall, only one
WR well log r
Wa
t and Future
nts\_Water Master
smission sys
e demolished
er supplies, w
oundwater, a
f recycled wa
be the devel
through frac
rings and M
in the area a
y Thrust Fau
roundwater o
ring and pro
gical investig
ation are pre
ll sites were
has been co
st surface geo
ever, may lo
an septic tan
results of Te
h-yield wells
east of the or
bines the sto
pated to be hi
y within lim
wells than P
e well may b
review with
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
stem can sev
d approxima
whether for
abandoned m
ater for
lopment of o
ctures. Limit
ehrten
and include t
ult. Many his
occurrence a
oduction wel
gation was
esented in
identified by
nfirmed by
ophysics, to
ower the
nk locations.
est Hole No.
s identified i
riginal testho
orage potenti
igh; howeve
mestone is
otential Wel
be necessary
over 100 gp
ngels
Plan
pplies
020401
MP.docx
verely
ately
mines,
one
ted
the
storic
and
lls.
y DE
be a
To
2,
in the
ole
ial of
er,
ll
y. For
pm
City of Angels
Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-10 MTB020401
July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx

3. Potential Well Site C (Area 3) – DE suggests exploring this location for high potential due to the proximity of Mehrten Gravels in conjunction with limestone deposits. Yields are anticipated to be high; however, water quality concerns may be identified. To meet the water supply short fall, only one well may be necessary. Two wells highlighted during the DWR well log search were identified with yields over 100 gpm close to this location.

4. Potential Well Site D (Area 2) – This location was selected as a potential location if the City pursues water well drilling and permitting efforts with the City of Murphys. The site is located in proximity to high-yield wells identified during DWR well log review and in the preferred geology package of tertiary gravels and Mehrten Formation close to limestone.

Angels WM
July 2013
b. A
In 2001,
water to t
prepared
undergro
successfu
examples
paragraph

1. T
M
du
gr
w
w

2. T
co
in
w
an
si
c. R
Of the 1,
supply m
use of thi
within th
increase
GHC Go
Angels C
delivery
average d
creek wa
irrigation
L.P. allow
Course. I
Course w
The seco
Associate
MP
Abandoned M
the Darby F
the City. At
and then su
ound water so
ully in the pa
s of utilizing
hs with their
The Schmaud
Mining activi
uring the mi
roundwater
water from th
were perform
The project ti
ost $80,000
nstalling a pu
water quality
nticipated to
ituation, the
Reduction in
600 AFY of
may be divert
is surface wa
he City. This
surface wate
olf Course m
Creek and rec
for GHC Go
delivery of r
ater and 154
n demand of
ws up to 450
If the WWTP
would be allo
ond amended
es L.P. ensur
Mines
Fire destroye
that time, a
mmarized by
ource to mee
ast, and it is
g the abandon
r approximat
der-Tyron M
ity occurred
ining proces
flooding due
he mine coul
med at the tim
itled Angels
in equipmen
ump and pip
, water produ
o be approxim
extraction o
Surface Wa
f surface wat
ted to the GH
ater supply,
would not r
er deliveries
eets its irriga
cycled water
olf Course fr
recycled wat
AF of recyc
f 319 AF. An
0 AFY (147
P could not d
owed to take
d agreement
res that the C
d 3,000 ft of
collaborativ
y DWR. Du
et water dem
reasonable t
ned mines fo
te yield.

Mine is locate
for approxim
ses with no c
e to an ancie
ld provide ap
me to confirm
Central Cal
nt and $30,00
pe into the m
uction, and a
mately 500,0
of water from
ater Diversion
ter that the C
HC Golf Cou
then this wo
represent an
to the City’
ation deman
r from the C
rom 2009 thr
er for the ye
led water wa
n agreement
MG/year) o
deliver recyc
e their entire
dated July 1
City maintai
Chapter
6-12
N:\MTB0
f the Utica D
ve review of
uring this em
mands. Sourc
to consider t
or a water so
ed northwest
mately 5-6 y
chemicals in
ent river syst
pproximately
m suitability
laveras Mine
00 a month t
mine to remov
a mine colla
000 gpd [29]
m this mine w
ns to Greenh
City receives
urse per agre
ould ‘free-up
alternate wa
s WTP to m
nds with a co
ity WWTP.
rough 2011 w
ears 2009-20
as delivered
between the
f surface wa
cled water m
supply from
998 between
ins a regular
r 6: Current
020401\Documen
Ditch, a wood
emergency w
mergency situ
ce water from
these sources
ource are des
t of the City
years, ending
nvolved. The
tem. The rep
y 500,000 gp
for use.
e at Rolleri P
to operate. T
ve the water
apse during p
]. In the end
was determin
horn Creek G
s, a full 28 pe
eement. If th
p’ water to b
ater supply, b
meet potable d
ombination o
The average
was 169 AF
011 was 95 A
to GHC Go
e City and Gr
ater for irriga
meeting Title
m Angels Cre
n the City an
supply of w
Wa
t and Future
nts\_Water Master
den flume u
water supply
uation, the C
m the mines
s for the futu
scribed in th
at an elevati
g in 1992. W
e mine exper
port states th
pd [29]. Wat
Property wa
The project i
r. Project con
pumping. W
, for the eme
ned not to be
Golf Course
ercent (450 A
he golf cours
e used for po
but an altern
demands.
of surface wa
e annual surf
Y or 55 MG
AFY. In 2012
olf Course fo
reenhorn Cr
ation of the G
e 22 Standar
eek.
nd Greenhor
water for irrig
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
sed to distrib
y options wa
City utilized a
has been uti
ure. Two
he following
ion of 1,765
Water was use
riences frequ
hat pumping
ter quality te
as estimated t
includes
ncerns includ
ater delivery
ergency
e feasible.

AFY) of this
se reduces th
otable dema
native metho
aters from
face water
G/year. The
2, 165 AF o
or a total
reek Associa
GHC Golf
ds, GHC Go
rn Creek
gation of the
ngels
Plan
pplies
020401
MP.docx
bute
as
an
ilized
ft.
ed
uent
ests
to
de:
y was
s
he
ands
od to
f
ates
olf
e
Angels WM
July 2013
GHC Go
Angels C
T
P
1,
The agre
City WW
A
w
of
sh
su
d. R
There are
course irr
fire supp
Effluent
recycled
to Holma
Golf Cou
average r
delivery
(winter) d
Holman R
immediat
recycled
total annu
in 2021 t
GHC Go
2021 (10

6.6 O
Future w
comparis
MP
olf Course. T
Creek:

The City shal
Project’s golf
,400 gpm.
ement also s
WTP as follow
At the time of
wastewater tr
f treated was
hall become
ufficient trea
Recycled Wa
e opportuniti
rigation. Som
ression, whi
from the WW
water is use
an Reservoir
urse from the
recycled wat
to GHC Go
discharge to
Reservoir pr
tely disposed
water from
ual producti
to 923 AFY
olf Course, re
0-year projec
Overview of
water demand
son of deman
The agreemen
ll make avail
f course irrig
states that th
ws:
f installation
reatment fac
ste water as
a secondary
ated waste w
ater for Nonies within th
me typical ap
ich currently
WTP is Title
ed for irrigati
r and 110 ac
e City WWT
ter delivery d
olf Course w
Angels Cre
rovides 202 A
d to the past
the WWTP
on of recycl
at buildout.
ecycled wate
ction) to 604
City Water
ds are summ
nd and suppl
nt states the
lable up to 4
gation at a m
e golf course
n and comme
cility, the golf
set forth her
y source of i
water is not a
-potable Dem
he City to use
pplications i
y utilize treat
e 22 tertiary
ion of a 136
at the GHC
TP have varie
during this t
as 154 AF. T
eek.

AF, or 66 M
tureland or G
will increase
ed water fro
Assuming a
er available f
AFY in 205
r Demands a
arized below
ly is then pre
Chapter
6-13
N:\MTB0
following w
450 AF of cre
minimum flow
e irrigation s
encement of
lf course irri
rein. From t
rrigation, av
available [2]
mands
e recycled w
include publ
ted water.
disinfected r
ac sprayfiel
Golf Course
ed from 77-
ime was 95
The WWTP
MG, of storag
GHC Golf Co
e as a functio
om the WWT
a recycled wa
for reuse in o
51 (buildout)
and Water
w including p
esented for v
r 6: Current
020401\Documen
with regard to
eek water fr
w of 700 gpm
system must
operation of
igation syste
that time for
vailable dur
.
water for non
lic landscape
recycled wa
ld (61 ac ava
e. Recycled
109 AFY fo
AFY. In 201
discharge p
ge capacity f
ourse. In the
on of increas
TP is estimat
ater delivery
other areas w
).

Supply
potable and
various optio
Wa
t and Future
nts\_Water Master
o untreated w
rom Angel’s
m up to a ma
t use recycle
f the City’s s
em shall be c
rward, untrea
ing those tim
n-potable use
e irrigation, d
ater as define
ailable for di
water delive
r the years 2
12 the recyc
permit also al
for recycled
e future, the
sed wastewa
ted to range
y of up to 31
will range fr
non-potable
ons.

City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
water from
Creek for th
aximum rate
ed water from
substantially
converted to
ated creek w
mes when
es other than
dust control,
ed by CDPH
isposal) adja
eries to the G
2009-2011. T
led water
llows season
water not
availability
ater flows. T
from 510 A
9 AFY to th
rom 191 AFY
e demands. A
ngels
Plan
pplies
020401
MP.docx
he
e of
m the
y new
use
water
n golf
, and
H. The
acent
GHC
The
nal
of
The
FY
he
Y in
A
Angels WM
July 2013
a. E
Existing
Chapter 5
GHC Go
and are r
169 AFY
total of 2
their prim
future wa
on actual
Currently
reduction
ordinanc
Reducing
meeting p
GHC Go
irrigation
Non-pota
(typically
potable w
non-pota
meter at t
The 2007
Table 6-2
productio
MP
Estimates of F
and projecte
5 are summa
olf Course ar
eflected in T
Y of creek wa
264 AFY. Pe
mary irrigatio
ater demand
l demand fro
Pr
Base Yea
10-Year P
20-Year P
Buildout
a Per Table
b Annual ir
diversion
c
2012 GH
154 AF o
y, all of the C
n in overall p
es related to
g the use of p
potable dem
olf Course as
n of agricultu
able water de
y during the
water deman
able uses suc
the WTP we
7-2012 avera
2, monthly tr
on.

Future Dema
ed water dem
arized below
re included a
Table 6-1. Fo
ater plus 95
er agreement
on water sou
projections,
om 2012 (sur
CITY
CURREN
rojection (Yea
ar (2011)
Projection (202
Projection (203
(2051)
e 5-16.
rrigation demand
ns (169 AF) plus
HC Golf Course i
of recycled water
City’s deman
projected sur
conservatio
potable wate
mands. Non-p
s well as resi
ural lands.
emands can
rainy season
nd. Any dema
h as landsca
ere used to c
age annual p
reated water
ands
mands for 10
w in Table 6-
as part of the
or the base y
AFY of recy
t, the golf co
urce, and cre
, the irrigatio
rface water d
T

Y OF ANGELS

NT AND PRO
ar)
21)
31)
d for GHC Golf
s recycled water
irrigation deman
r [21].
nds are met
rface water d
on efforts dur
er for non-po
potable wate
idential, com
be estimated
n). The dema
and above th
ape irrigation
alculate the
production w
r production
Chapter
6-14
N:\MTB0
0-year, 20-ye

1. Diversion
e City’s annu
year, the wat
ycled water b
urse shall us
eek water use
on demand f
diversion plu
TABLE 6-1

S WATER MA

OJECTED WA
Proje
Citya G
967
1,197
1,482
2,336
Course based on
(95 AF).
nd is 165 AF of s
by the use o
demands by
ring drought
otable uses w
r demands in
mmercial, ins
d by identify
and in the ra
his base rate
n. Historical
monthly pro
was estimated
at the plant
r 6: Current
020401\Documen
ear, and build
ns from Ang
ual allocation
er demand f
based on the
se recycled w
e becomes a
for GHC Gol
us recycled w

ASTER PLAN

ATER DEMA
ected Demand
GHC Golf Cou
264b
319c
319c
319c
n 2009-2011 ave
surface water fro
of surface wa
reducing po
ts and/or em
will also prov
nclude irriga
stitutional, an
ying months
ainy season i
is assumed
flow data co
oduction of t
d to be 314 M
is displayed
Wa
t and Future
nts\_Water Master
dout conditi
gels Creek fo
n of surface
for GHC Gol
e 2009-2011
water from t
a secondary s
lf Course is
water delive
N
ANDS
ds (AFY)
urse Tot
1,23
1,51
1,80
2,65
erage of surface
om Angels Creek
ater. There is
otable deman
mergency con
vide addition
ation of land
nd industrial
with low irr
is assumed to
to be deman
ollected from
treated water
MG (per Tab
d as a percen
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
ons develop
or irrigation o
water from U
lf Course is
averages fo
the WWTP a
supply. For
319 AFY ba
ery).
al
31 16
01 55
water
k and
s potential fo
nds through
nditions.
nal capacity
dscaping for
l accounts an
rigation dem
o the base
nd for
m the influen
r for the City
ble 5-4). In
ntage of total
ngels
Plan
pplies
020401
MP.docx
ped in
of
UPA
or a
as
ased
or
City
y for
nd
mands
nt
y.
l year
City of Angels
Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-15 MTB020401
July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx TABLE 6-2

CITY OF ANGELS WATER MASTER PLAN
2007-2012 HISTORICAL MONTHLY PERCENTAGE OF

ANNUAL TREATED WATER PRODUCTION
2007-2012 Monthly Percentage of Annual
Production, %a
Month
Monthly
Productionb
Baseline
Demandc
Non-potable
Demandd
January 4.8 4.8
February 4.3 4.8
March 5.0 4.8
April 6.2 1.4
May 9.3 4.5
June 11.2 6.4
July 13.9 9.1
August 14.2 9.4
September 11.8 7.0
October 8.5 3.7
November 5.8 1.0
December 5.0 4.8
Total 100.0 42.5
a Per Table 5-4.
b Monthly production as a percentage of annual production. c 2007-2012 average December-March demand (rounded).
d 2007-2012 April-November non-potable demand = monthly production – baseline demand.

Months with the lowest production can be correlated to the rainy season when irrigation demands are low. As shown in Table 6-2, the lowest monthly demands for 2007-2012 occurred from December through March, with an average winter monthly demand of 4.8 percent of yearly production. The 2007-2012 estimated non-potable demand for April through November is the additional percentage above the monthly 4.8 percent identified as the base potable water demand.

The additional non-potable or irrigation demand in the summer months adds to approximately 43 percent (42.5 percent) of the annual demand. Using this factor, the estimate of non-potable demands for the City is summarized in Table 6-3.

Angels WM
July 2013
Existing
into pota

Proje
Base Yea
10-Year P
20-Year P
Buildout (
a
Non-pota
b See Table
b. C
Comparin
suppleme
water sup
MP
2007-2012
2007-2012
Estimated
Estimated
a
Assumed
Table 6-2
b
Estimated
the baseli
and projecte
ble and nonPOT
ection (Year)
r (2011)
Projection (202
Projection (203
(2051)
able demand for
e 6-1.

Comparison o
ng the curren
ental water s
pplies at buil
CITY

ESTIMATE
2 Average Win
2 Total Additio
d Non-Potable D
d Potable Dema
baseline potable

2. d percent of dem
ine Winter Dema
ed water dem
-potable dem
CITY

TABLE AND N
Potabl
556
21) 688
31) 852
1,343
City assumed to
of Available
nt supply fro
supplies will
ldout will be
T

Y OF ANGELS

E OF NON-PO
Item
nter Month De
onal Demand (
Demand as Per
and as Percenta
e demand based
mand that is Nonand percentage o
mands for 10
mands are pr
T

Y OF ANGELS

NON-POTAB
le Citya
411
509
630
3 993
o be 42.5 percent
e Supply vs.
om UPA wit
l occur withi
e 1,055 AFY
Chapter
6-16
N:\MTB0
TABLE 6-3

S WATER MA

OTABLE DEM
emand (Dec-M
(Apr-Nov)
rcentage of An
age of Annual
on percentage o
-Potable = Addit
of total demand.
0-year, 20-ye
esented in T
TABLE 6-4

S WATER MA

BLE PROJEC
Projected A
NonGHC Go
2 3
3 3
t of total demand
Projected D
th the projec
in the next te
Y as shown in
r 6: Current
020401\Documen

ASTER PLAN

MANDS FOR
Mar)a
nnual Demandb
Demand
of annual produc
tional production
ear, and build
Table 6-4.

ASTER PLAN

CTED WATER
Annual Deman
-Potable
olf Courseb
264
319
319
319
d per Table 6-3.
emands
cted demands
en years. The
n Table 6-5.

Wa
t and Future
nts\_Water Master
N
R CITY
Value,

4.8 42.5
b 42.5

57.5 ction data presen
n percentage abo
dout conditi
N

R DEMANDS
nd (AFY)
Total
675
828
949
1,312
s illustrates t
e estimated

City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
, %
5 5
5 nted in
ove
ons separate
S
Total Potable
Non-Potab
1,231
1,516
1,801
2,655
that the need
deficit in fut
ngels
Plan
pplies
020401
MP.docx
ed
e and
ble
d for
ture
City of Angels
Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-17 MTB020401
July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx TABLE 6-5

CITY OF ANGELS WATER MASTER PLAN

COMPARISON OF WATER SUPPLY VERSUS DEMAND PROJECTIONS

GHC GOLF COURSE SURFACE WATER IRRIGATION DEMANDS
Projection (Year)
Annual
Supplya
(AFY)
Projected Annual Demandb
(AFY) Supply –
Demand
City (AFY)
GHC Golf
Course Total
Base Year (2011) 1,600 967 264 1,231 369
10-year Projection (2021) 1,600 1,197 319 1,516 84
20-year Projection (2031) 1,600 1,482 319 1,801 -201
Buildout (2051) 1,600 2,336 319 2,655 -1,055
a Assuming no recycled water deliveries to GHC Golf Course. b Per Table 6-1.

If approximately 43 percent of the City’s water demands is non-potable, then the opportunity exists to provide recycled water for the majority of these uses. For comparison purposes, Table 6-6 displays the balance of supply vs. demand using only City potable water demands, but keeping the GHC Golf Course surface water diversions in place. In this scenario, an additional supply of 62 AFY is required at buildout.

TABLE 6-6

CITY OF ANGELS WATER MASTER PLAN

COMPARISON OF WATER SUPPLY VERSUS DEMAND PROJECTIONS

ASSUMING ONLY CITY POTABLE WATER DEMANDS AND

GHC GOLF COURSE SURFACE WATER IRRIGATION DEMANDS
Projection (Year)
Annual
Supplya
(AFY)
Projected Annual Demand (AFY) Supply –
Demand
(AFY)
City
Potableb
GHC Golf
Coursec Total
Base Year (2011) 1,600 556 264 820 780
10-year Projection (2021) 1,600 688 319 1,007 593
20-year Projection (2031) 1,600 852 319 1,171 429
Buildout (2051) 1,600 1,343 319 1,662 -62
a Assuming no recycled water deliveries to GHC Golf Course. b Assumes potable demand is 57.5 percent of City demand (see Table 6-4). c Per Table 6-1.

Separating the GHC Golf Course demand for surface water supply from the City’s water demand (potable and non-potable) provides the City with adequate supply through the 20-year projected growth, but not to buildout. This scenario is presented in Table 6-7. At buildout, an additional supply of 736 AFY is required.

Angels WM
July 2013
C
Bas
10-y
20-y
Bui
a
Pot
Under th
combinat
Course fr
buildout.

P
Base Yea
10-year P
20-year P
Buildout
a Assumes

6.7 O
In the fol
options, c
the estim
a. O
Option 1
considera
MP

COMPARISON
GHC
Projection (Y
se Year (2011)
year Projection
year Projection
ildout (2051)
table and non-po
e current agr
tion of reduc
rom the dem
This scenar
COMPA
Projection
ar (2011)
Projection (202
Projection (203
(2051)
potable demand
Options for M
llowing secti
can be imple
mated future d
Option 1 – Ob
would be to
ations are as
CITY

N OF WATER

C GOLF COU
Year)
n (2021)
n (2031)
otable demands (
reement with
cing the City
mand would b
rio is illustra
CITY

ARISON OF
EXCLUD
Annu
Suppl
(AFY
1,600
1) 1,600
1) 1,600
1,600
d is 57.5 percent
Meeting Fu
ions, three o
emented as a
demands.
btain Increas
o acquire all
follows:

T

Y OF ANGELS

R SUPPLY V

URSE SURFA
Annual
Supply
(AFY)
1,600
1,600
1,600
1,600
(per Table 6-1).
h UPA for a
y’s demand t
be required t
ated in Table
T

Y OF ANGELS

WATER SUP

DING NON-P
al
ly
Y)
City
Potabl
0 556
0 688
0 852
0 1,343
of City demand
ture Deman
options are ou
a future strat
sed Allocatio
needed futu
Chapter
6-18
N:\MTB0
TABLE 6-7

S WATER MA

ERSUS DEM

ACE WATER
Projected A
Citya
967
1,197
1,482
2,336
a firm 1,600 A
to only potab
to stay withi
e 6-8.

TABLE 6-8

S WATER MA

PPLY VERSU

OTABLE WA
Projected A
le
a
City N
potab
0 0
0 3 0
(see Table 6-4).
nds
utlined. Any
tegy to make
ons from UP
ure suppleme
r 6: Current
020401\Documen

ASTER PLAN

MAND PROJE

IRRIGATION
Annual Dema
GHC Golf
Course
0 0
0 0
AFY of surf
ble uses and
in the existin

ASTER PLAN

US DEMAND

ATER DEMA
Annual Deman
NonbleGHC G
Cour
0 0
0 0
.
y one of thes
e up for the w
PA
ental water fr
Wa
t and Future
nts\_Water Master
N

ECTIONS EXC

N DEMANDS
and (AFY)
Total
967
1,197
1,482
2,336
face water su
d separating t
ng allocation
N

PROJECTIO
ANDS
nd (AFY)
Golf
rse Tot
55 68
85 1,34
se options, o
water supply
from UPA. K
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M

CLUDING
S
Supply –
Demand
(AFY)
633
403
118
-736
upply, a
the GHC Go
n through
ONS
Supp
Dem
tal (AF
6 1,0
8 91
2 74
43 25
r combinatio
y deficit and
Key
ngels
Plan
pplies
020401
MP.docx
olf
ply –
mand
FY)
44 12
48 57
on of
meet
Angels WM
July 2013

1. T
1 th

2. U
re
d

3. C
C

4. C
th
su
U
al
ar






T
al
ca
b. O
For Optio
extraction
further co
Due to th
explorati
been dev
develope
sequence
areas hav
groundw
demand s
areas can
MP
The current a
,600 AFY. T
hrough Attac
UPUD receiv
eality, UPUD
iversions.

CCWD is allo
CCWD curre
Considering “
he City must
upplies in al
UPA receives
llocation fro
re as follows
Scenario I
Scenario I
Scenario I
Scenario I
Scenario V
Scenario V
The Amended
llocation, an
an be found
Option 2 – Su
on 2, it is ass
n and pumpi
onsideration
he extremely
ion findings,
veloped to m
ed to depict t
es of the Meh
ve the most s
water. The we
shortfall. Ba
n be used to r
agreement wi
This quantity
chment A.
ves 4,800 AF
D cannot rec
owed to dive
ntly uses app
“2” and “3”,
t plan for ver
ignment wit
s a reduced p
om Scenario
s:

I (a normal w
II = 90 perce
III = 80 perc
IV = 68 perc
V = 58 perce
VI = 48 perc
d Attachmen
nd a table of
in Appendix
upplement w
sumed that s
ing. As desc
n.
y variable ge
a phased ite
aximize the
the preferred
hrten Forma
sustainable g
ell yields in t
ased on the p
reduce the n
ith UPA pro
y is and has b
FY with an o
ceive this tot
ert, for consu
proximately
opportuniti
ry dry years
th reduced al
percentage o
I thought Sc
wet year) =
ent of norma
cent of norm
cent of norm
ent of norma
cent of norm
nt A, a table
Amended A
x E.
with Groundw
supplementa
cribed earlier
ology and po
erative appro
placement o
d hydrogeolo
ation near per
groundwater
these areas a
proposed inv
number of we
Chapter
6-19
N:\MTB0
ovides a max
been provide
option for an
al amount du
umptive purp
y 1,800 AFY
es exist for a
and the poss
llocations th
of water in ea
cenario VI. T
100 percent
al
mal
mal
al
mal
prepared by
Attachment A
water
al water wou
r, three poten
otential sign
oach is propo
of future pro
ogic setting w
rmeable lim
r resources a
are anticipate
vestigation ef
ells needed t
r 6: Current
020401\Documen
ximum alloca
ed regardles
n additional 1
ue to contrac
poses, up to
Y for the Ebb
acquiring ad
sibility that U
hrough Attac
ach successi
The scenario
of the alloca
y UPA to fur
A allocations
uld be provid
ntial areas ha
nificant diffe
osed using a
duction well
which consis
mestones loca
s they are ne
ed to be high
ffort of the w
to address th
Wa
t and Future
nts\_Water Master
ation from U
ss of the allot
1,000 AF fro
ctual restrict
8,000 AFY
etts Pass WT
dditional sup
UPA may ne
chment A. Fo
ive dry year
os and respec
ation
rther describ
s from 1999
ded through g
ave been ide
erences in pr
a conceptual
ls. The mode
sts of the san
ated east of t
ear recharge
h to satisfy t
well sites, hig
he water supp
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
UPA of
tment provid
om UPA. In
tions in
. Of this volu
TP.
plies. Howe
eed to restric
or reference,
in a stepped
ctive allocati
e the water
through 201
groundwater
entified for
oduction we
model that h
el has been
nd and grave
the City. The
areas for
the water sup
gher well yi
ply shortfall
ngels
Plan
pplies
020401
MP.docx
ded
ume,
ever,
ct
,
d
ions
12 r
ell
has
el
ese
pply
eld
l.

Angels WM
July 2013
c. O
Non-pota
recycled
water for
projected
water dem
non-pota
A signifi
amount b
450 AFY
free-up th
potable w
source (f
for other

6.8 P
Because
provision
below.
a. E
Based on
for tempo
adequate
this grou
periods o
As prove
be tapped
activate i
power ou
system. W
conduct r
elements

1. L

2. M

3. L
MP
Option 3 – En
able water is
water that is
r non-potable
d non-potabl
mand is used
able water, th
cant amount
between 200
Y in the futur
he raw water
water uses. If
for example a
non-potable
Planning for
of potential
ns for drough
Emergency U
n the emerge
orary supple
source. Rep
undwater is c
of time. Relia
en in 2001, th
d when nece
in the event
utage, or eve
When activa
responses to
:

List of water
Measures to b
List of City e
nhanced Use
s either the ra
s produced a
e uses within
e water dem
d for non-po
he City’s sup
t of recycled
9 and 2011 i
re. By separa
r that is bein
f the golf co
an irrigation
e uses.
r Drought Y
planned or u
ht conditions
Use of Mines
ency situation
emental wate
ports state th
constant. How
ability of thi
his suppleme
essary. It is re
of a disaster
en a bioterror
ted, the City
damaged pr
system com
be taken prio
mergency op
e of Non-pot
aw supply w
at the WWTP
n the City. A
mands. It has
otable uses as
pply can prov
d and raw wa
is 264 AFY.
ating this dem
ng diverted to
urse convert
n well), this w
Years
unplanned cu
s are critical
s
n in 2001, ab
er. In particu
hat the mine
wever, tappi
is source ove
ental water s
ecommende
r such as a fir
rism attack o
y would coor
rocesses and
mponents (we
or to and foll
peration per
Chapter
6-20
N:\MTB0
table Water
water that com
P facility. Th
Available rec
been estima
s summarize
vide potable
ater is directe
. By agreeme
mand from t
o the golf co
ts to use of a
would free-u
utbacks in su
. A discussio
bandoned m
ular the Schm
fills constan
ing this sour
er the long te
supply is an
d that the Ci
re on the flu
on the City’s
rdinate dama
d systems. Th
ells, distribut
lowing an em
sonnel.
r 6: Current
020401\Documen
mes through
he City’s WW
cycled water
ated that 43 p
ed in Table 6
e water for fu
ed to the GH
ent, GHC G
the City’s al
ourse and dir
all recycled w
up recycled w
urface water
on of manag
mines seem to
mauder-Tyro
ntly, and this
rce has not b
erm cannot b
excellent re
ity have a re
ume system,
s water treatm
age surveys,
he plan wou
tion system,
mergency ev
Wa
t and Future
nts\_Water Master
h the canal sy
WTP facility
r supplies ali
percent of th
6-4. Through
uture growth
HC Golf Cou
Golf Course i
llotment from
rect that flow
water, but th
water for use
r supplies in
gement strate
o be an appro
on Mine, has
s suggests tha
een impleme
be predicted
source for em
esponse plan
an earthquak
tment and di
gather infor
uld include th
storage tank
vent.

City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
ystem or the
y can provid
ign well with
he City treate
h the use of
h.
urse. The ave
s allowed
m UPA, this
w to the WTP
hen finds ano
e within the
the future,
egies is prov
opriate sourc
s proven to b
at recharge o
ented for lon
d.
mergencies,
n in place to
ke, a City-w
stribution
rmation, and
he following
ks, etc.).
ngels
Plan
pplies
020401
MP.docx
de
h
ed
erage
will
P for
other
City
vided
ce
be an
of
ng
to
wide
d
g
Angels WM
July 2013

4. In

5. L
in

6. U
w
An impo
to obtain
b. W
Water co
estimated
conserva
Adoption
peak usag
suggestio
a sensible
The City
to take in
supply) o
experienc
As part o
and pipel
agreemen
be in plac
shortage
To plan f
Ordinanc
drought,
MP
nformation r
List of water
nstallation co
Utility service
works supplie
rtant part of
supplement
Water Conser
onservation c
d 43 percent
ation and sup
n of a summe
ge on maxim
ons of incorp
e way to pla
is encourag
n case of a lo
or temporary
ced with the
of an emerge
lines that cou
nts with othe
ce to regulat
situations.
for droughts
ce with goals
and emergen
regarding co
testing labor
ontractors.
e numbers fo
ers.
f the emergen
tal water from
rvation (Dro
can significa
of non-pota
pplemental u
er water rest
mum days co
porating xero
an for additio
ged to develo
ong-term dec
y interruption
Darby Fire)
ency action p
uld be used t
er member a
te outdoor irr
and emerge
s that includ
ncy stages. A
ordination w
ratories, wat
or traffic sig
ncy response
m the mines
ought Contin
antly reduce
able uses wit
use of recycle
triction ordin
ould be imple
ophytic land
onal water sa
op and adopt
creased supp
n in the raw
).
plan, the City
to convey w
agencies for e
rigation and
encies, the C
e voluntary
An example
Chapter
6-21
N:\MTB0
with police an
ter system co
gnal repairs,
e plan would
.
ngency Plans
the demand
thin the City
ed water.
nance to redu
emented. En
dscaping for r
avings into th
t an emergen
ply (drought
water supply
y should iden
water from ot
emergency d
d all non-pota
ity can adop
and mandato
of water sho
r 6: Current
020401\Documen
nd fire depa
ontractors, a
gas and elec
d be informa
s)
on the City’
y can be redu
uce overall w
ncouraging c
residential a
he future.
ncy action pl
conditions l
y coming thr
ntify locatio
ther sources.
diversions. I
able water u
pt a three stag
ory stages to
ortage stages
Wa
t and Future
nts\_Water Master
artment perso
and pipe repa
ctrical repair
ation and the
’s treated wa
uced by a com
water deman
conservation
and commerc
lan. This wo
leading to U
rough the flu
ons and avail
. The City sh
In addition, a
use during em
ge Water Co
o be impleme
s are present
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
onnel.
air and
rs, and water
e required ste
ater. The
mbination of
nd by reduci
n with
cial properti
ould include
PA reducing
umes (as
lability of pu
hould pursue
a system sho
mergency wa
onservation
ented in norm
ted in Table
ngels
Plan
pplies
020401
MP.docx
r
eps
f
ng
es is
steps
g
umps
e
ould
ater
mal,
6-9.

Angels WM
July 2013
To achiev
based on
would be
drought a
reduction
stages of
disaster o
jeopardiz

6.9 A
Currently
potable w
use of rec
options (
explored
as presen
included
MP
WATE
Shortage
0 up to 10%
10% to 30%
30% to 50%
ve these goa
reduced sup
e based on th
and emergen
n up to 50 pe
f the water us
or when the h
zed.

Alternate Fu
y, the City re
water. Other
cycled water
surface wate
and evaluat
nted in Table
for buildout
CITY

ER SHORTAG
St
No
Dro
Eme
als, City Cou
pply. The sp
he amount th
ncy stages, th
ercent, if req
se reduction
health and s
uture Water
elies exclusiv
future optio
r for non-pot
er, groundwa
ted. From thi
e 6-10. For c
t facilities fo
T

Y OF ANGELS

GE STAGES A
tage
ormal
ought
ergency
uncil would d
ecific criteri
hat projected
he City’s rat
quired. In som
n plan. For ex
afety of cust
r Supply Str
vely on surfa
ons include th
table deman
ater, and rec
is process, se
comparison p
or each strate
Chapter
6-22
N:\MTB0
TABLE 6-9

S WATER MA

AND WATER
Water Use Re
0 to 10% R
10% to 30%
30% to 50%
declare the a
ia for trigger
d supply does
te structure c
me cases, it m
xample, stag
tomers in the
rategies
face water de
he developm
nds. By comb
ycled water)
even alterna
purposes, ord
egy.
r 6: Current
020401\Documen

ASTER PLAN

R USE REDUC
eduction Goal
Reduction
% Reduction
% Reduction
appropriate w
ring the City
s not meet p
can be set as
may be nece
ges may be sk
e City’s wat
elivered thro
ment of groun
bining eleme
), a broad arr
ate water sup
der of magni
Wa
t and Future
nts\_Water Master
N

CTION GOA
l Program
Volun
Manda
Manda
water conser
y’s water con
projected dem
flexible to a
essary for the
kipped durin
ter service ar
ough UPA as
ndwater and
ents of the th
rray of strate
pply strategie
itude capital
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
LS
m Type
ntary
atory
atory
rvation stage
nservation st
mand. Under
attain water
e City to ski
ng a natural
rea are
s a source of
d the increase
hree primary
gies can be
es are identif
l costs are al
ngels
Plan
pplies
020401
MP.docx
e
tages
r
use
ip
f
ed
y
fied
lso
Angels WM
July 2013
1 – Increa
2 – Addit
New D
3 – Devel
Local
4 – Devel
Regio
5 – Some
UPA,
Creek
Repla
6 – Some
UPA,
Creek
Repla
7 – Some
UPA,
Distrib
Diver
GHC
Local
a. E
To determ
evaluated
factors as
through t
importan
importan
MP
SUMM
Strate
ase Deliveries t
tional Supply th
Downstream D
lop Groundwat
Wells (Area 1
lop Groundwat
onal Wells (Are
Increase in De
Minimize Div
k to Supply GH
acing with Recy
Increase in De
Minimize Div
k to Supply GH
acing with Loca
Increase in De
Construct City
bution System
sions from An
Golf Course b
Groundwater
Evaluation of
mine a poten
d considering
s presented i
the use of im
nt were assig
nce factors of
CITY

MARY OF FU
egy
through UPA
hrough UPA th
Diversion
ter Supply from
)
ter Supply from
ea 3)
eliveries throug
versions from A
HC Golf Course
ycled Water
eliveries throug
versions from A
HC Golf Course
al Groundwate
eliveries throug
y-wide Dual
, Minimize
gels Creek to S
y Replacing w
f Water Supp
ntially superi
g multiple cr
in Table 6-1
mportance fac
gned a value
f 0.5 and 0.7
TA

Y OF ANGELS

TURE ALTE
O
Mag
hrough
m
m
gh
Angels
e by
gh
Angels
e by
er
gh
Supply
with
ply Strategie
ior alternate
riteria. Thes

1. Based on
ctors. Specif
of 1.0. Conv

7. Chapter
6-23
N:\MTB0
ABLE 6-10

S WATER MA

RNATE WAT
Order of
nitude Cost,
$M

10.1 12.5

2.7 4.7

7.7 7.9

10.0 es
, the seven s
e criteria inc
input from C
fically, the e
versely, less
r 6: Current
020401\Documen

ASTER PLAN

TER SUPPLY
Depends on t

UPUD/CCW
Diversion wo
hydroelectric
require const
May require
May require
demands.

Depends on t

UPUD/CCW
communicati
Course and C
diversions.

Depends on t

UPUD/CCW
substitute for
course irrigat
Depends on t

UPUD/CCW
distribution s
substitute for
course irrigat
strategies des
cluded econo
City staff, th
evaluation cr
important c
Wa
t and Future
nts\_Water Master
N

Y STRATEGIE
Key Charact
transfer of allo
WD.
ould be downst
c plants. Implem
truction of seco
six wells to me
three wells to m
transfer of allo
WD. Requires ef
ion/coordinatio
City to minimiz
transfer of allo
WD. Groundwat
r surface water
tion.
transfer of allo
WD and constru
system. Ground
r surface water
tion.
scribed in Ta
omic and no
he criteria we
riteria consid
riteria were
City of A
Water Master
e Water Sup
MTB0
Plan\Final\0713 M
ES
teristics
ocations from
tream of
mentation wou
ond WTP.
eet buildout de
meet buildout
ocations from
ffective
on between GH
ze surface wate
ocations from
ter well(s) wou
r diversions for
ocations from
uction of dual
dwater wells w
r diversion for g
able 6-10 we
on-economic
ere prioritize
dered most
designated w
ngels
Plan
pplies
020401
MP.docx
uld
emands.

HC Golf
er
uld
r golf
would
golf
ere
ed
with
City of Angels
Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-24 MTB020401
July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx TABLE 6-11

CITY OF ANGELS WATER MASTER PLAN

EVALUATION CRITERIA FOR ALTERNATE WATER SUPPLY STRATEGIES Evaluation Criteria Description
Importance
Factor
Meet 10-year Projection Capacity to deliver 10-year projected demands. 1.0 Meet Buildout Projection Capacity to deliver buildout projected demands. 0.5 WTP Expansion Need to expand existing WTP. 0.5
Second WTP Need to construct second WTP. 1.0
Minimize Impact of a Single Point of
Failure (Single Pipeline)
Level of redundancy in key transmission pipelines. 1.0
Provisions for Emergency Conditions
(Failure of Upstream Conveyance)
Ability to tolerate interruptions in raw water supply. 0.7 Impact from Drought Potential reduction in supply due to drought. 0.7 Capital Cost Relative magnitude of capital investment. 1.0 Operational Cost Relative magnitude of annual operation and maintenance costs.

1.0 Ease of Implementation Number/complexity of agreements, permits, approvals required for implementation.

1.0 Coordinated with Other City Plans Consistency with other City master plans or programs. 0.5 In evaluating a strategy, a score of 1-5 was selected for each criterion. Lower scores reflected an inferior alternate while a score of 5 signified a superior strategy when considering a specific evaluation criteria. As an example, for the criterion, WTP Expansion, if the strategy required an expansion of the existing WTP, the strategy would be assigned a low score. In contrast, strategies that do not incorporate improvements to the existing WTP would receive a higher score. By then applying the importance factor to each criterion score, a weighted score could be calculated and aggregated to identify a preferred alternate. This process is summarized in Table 6-12.

City of Angels
Water Master Plan
Chapter 6: Current and Future Water Supplies
Angels WMP 6-25 MTB020401 July 2013 N:\MTB020401\Documents\_Water Master Plan\Final\0713 MP.docx TABLE 6-12

CITY OF ANGELS WATER MASTER PLAN

EVALUATION MATRIX FOR ALTERNATE WATER SUPPLY STRATEGIES Criteriab Importance
Factor Water Supply Strategya 1 2 3 4 5 6 7
Valuec Weightedd Value Weighted Value Weighted Value Weighted Value Weighted Value Weighted Value Weighted Meet 10-year Projection 1 5 5 5 5 3 3 5 5 5 5 3 3 3 3
Meet Buildout Projection 0.5 3 1.5 3 1.5 3 1.5 5 2.5 1 0.5 1 0.5 5 2.5 WTP Expansion 0.5 1 0.5 5 2.5 5 2.5 5 2.5 3 1.5 3 1.5 3 1.5 Second WTP 1 5 5 1 1 5 5 5 5 5 5 5 5 5 5 Minimize Impact of a Single Point of Failure (Single Pipeline) 1 1 1 3 3 3 3 3 3 1 1 1 1 1 1
Provisions for Emergency Conditions (Failure of Upstream Conveyance)

0.7 1 0.7 3 2.1 3 2.1 3 2.1 1 0.7 1 0.7 1 0.7
Impact from Drought 0.7 5 3.5 5 3.5 1 0.7 3 2.1 5 3.5 3 2.1 3 2.1 Capital Coste 1 3 3 1 1 5 5 3 3 3 3 3 3 1 1 Operational Cost 1 5 5 1 1 3 3 3 3 5 5 5 5 1 1 Ease of Implementation 1 5 5 1 1 3 3 3 3 5 5 3 3 3 3 Coordinated with Other City Plans

0.5 3 1.5 3 1.5 3 1.5 3 1.5 5 2.5 1 0.5 1 0.5
Totals 32 23 30 33 33 25 21
a See Table 6-10 for description. b See Table 6-11 for description. c Value of 1 represents least favorable, value of 5 represents best or superior alternate. d Weighted = Value x Importance Factor. e Strategies with capital costs greater than $10M were considered least favorable. The strategy with the lowest capital cost was considered superior.

Angels WM
July 2013
b. P
From a re
(Increase
Wells), a
Angels C
of the thr
Table 6-1
S
Al
Surface
Ground
Recycl
Irrigati
Total
a
Recycl
b
Recyc
Based on
recomme

1. P

2. R

3. In

4. M
These ac
MP
reliminary R
eview of the
ed Deliveries
and Strategy
Creek to Sup
ree strategies
1) is illustrat

SUMMARY O
lternate Water
e Water Delive
dwater Develop
ed Water Use f
on
led water deliver
led water delive
n this initial e
ended:
ursue multip
Request addit
nitiate next s
Maximize use
tions are inc
Recommenda
e weighted sc
s through UP
5 (Some Inc
ply GHC Go
s in meeting
ted in Table
CITY

OF POSSIBLE

TO MEET B
r Supply Sour
eries through U
pment
for GHC Golf
ries, 2009-2011
ries, 2012.
evaluation, f
ple parallel o
tional delive
steps in grou
e of recycled
corporated in
ation
cores in Tab
PA), Strategy
crease in De
olf Course b
buildout wa
6-13.

TA

Y OF ANGELS
E “BLEND” O

BUILDOUT W
rce
Av
Cu
UPA
Course
average.
for future wa
opportunities
eries through
undwater exp
d water at GH
nto a series o
Chapter
6-26
n:\m
ble 6-12, thre
y 4 (Develop
livery throug
y Replacing
ater supply r
ABLE 6-13

S WATER MA

OF ALTERNA

WATER DEM
vailable Suppl
urrent
1,600
0 95a
1,695
ater supplies
s.
h UPA.
ploration.

HC Golf Co
of recommen
r 6: Current
mtb020401\docume
ee strategies
p Groundwa
gh UPA, Mi
g with Recyc
requirements

ASTER PLAN

ATIVE WATE
MAND OF 2,6
ly (AFY)
Future
2,000 A
4 505 D
150b M
2,655
s, the followi
ourse in lieu
nded project
Wa
t and Future
ents\_water master
appear supe
ater Supply f
inimize Dive
cled Water).
s of 2,655 A
N

ER SUPPLY S
55 AFY
Com
Additional annu
00 AFY
Develop 2-3 gro
Maximum histo
ing actions b
of surface w
s described i
City of A
Water Master
e Water Sup
MTB0
r plan\final\0713 m
erior – Strate
from Region
ersions from
A possible m
FY (see

SOURCES
mment
ual delivery of
oundwater wel
orical delivery

by the City a
water.
in Chapter 9
ngels
Plan
pplies
020401
mp.docx
egy 1
nal
m
mix
f
lls
are

9. Angels WM
July 2013
7 W
The purp
treatment

7.1 C
Water de
based on
factors w
personne
respectiv
Although
evaluatio
flow met
from the
prior to f
significan
processes
70 gpm (
Table 7-1
Appendix
The proje
facilities
treated w
demand)
demand)
MP
Water T
pose of this c
t, storage, an
Current and
emands and p
historical in
were establish
el, and previo
vely (as discu
h current and
ons of availab
ter does not a
storage tank
flocculation a
nt demand a
s. Based on
(100,800 gpd

1. Detailed w
x H.
ected MDD
for coagulat
water storage
were used.
were used t
Treatm
chapter is to
nd transmiss
d Projected T
peaking fact
nfluent flow
hed based on
ous studies.
ussed in Sect
d projected w
ble water su
account for w
k outlet and u
and filtration
at the WTP a
input from th
d). A summa
water deman
(influent dem
tion, floccul
, the project
The projecte
to evaluate th
ment Pla
evaluate the
sion facilities
Treated Wa
tors were dev
meter record
n historical i
The recomm
tion 5.4).
water deman
upply and dis
water used in
used to gene
n (see Figure
and is includ
he WTP Sup
ary of curren
nd projection
mand plus in
ation, sedim
ted MDD and
ed MDD and
he transmiss
7-1
n:\m
ant Ev
e hydraulic a
s under exist
ater Deman
veloped in C
ds for raw w
influent flow
mended MDD
nds presented
stribution sy
n various un
erate sodium
e 7-1). Wate
ed in hydrau
pervisor, “pr
nt and projec
ns in one-yea
n plant proce
mentation, filt
d PHD (influ
d PHD (influ
ion main fro
mtb020401\docume
valuati
and treatmen
ting and futu
nds
Chapter 5. Th
water deliver
w meter recor
D and PHD f
d in Chapter
stem perform
nit processes
m hypochlorit
er for interna
ulic evaluatio
rocess water
cted water de
ar increment
ess demand)
tration, and
uent demand
uent demand
om the WTP
ents\_water master
on
nt capacity of
ure flow scen
he ADD proj
red to the WT
rds, input fro
factors are 2
r 5 were usef
mance, the W
s at the plant
te solution th
al processes r
ons of the va
r” demands a
emands is pr
ts are include
) was used to
disinfection
d plus in-pla
d, excluding
P to the distri
MTB0
r plan\final\0713 m
f the water
narios.
ojections wer
TP. Peaking
om WTP

2.2 and 1.7,
ful for
WTP influen
t. Water is dr
hat is injecte
represents a
arious treatm
are estimated
rovided in
ed in
o evaluate
. For evaluat
ant process
in-plant pro
ibution syste
020401
mp.docx
re
nt
rawn
ed
ment
d at
ting
cess
em.

Angels WM
July 2013
Y
Base Yea
10-year P
(2021)
20-year P
(2031)
Buildout
a
Projectio
b
Projected
c
See Tabl
d
MDD = 2
e
PHD = 1

7.2 E
The City
conventio
than a de
water reg
evaluatio
a. C
An alumi
Angels F
monitorin
feed pum
Flocculat
motor an
minute (r
of approx
process c
mixing fo
demand c
MP
CURREN
ear P
ar (2011)
Projection
Projection
(2052)
ons based on WT
d WTP Influent D
e 5-15.

2.2 x ADD.
.7 x MDD.

Evaluation o
acquired the
onal filtratio
ecade, the W
gulations, alt
on of each un
Coagulation a
inum-based
Forebay and
ng and autom
mps.
tion occurs i
nd drive gear
rpm). The ba
ximately 9 ft
criteria or loa
or a period o
conditions ar
CITY

NT AND PROJ
Population
3,919
4,853 1
6,009 1
9,453 2
TP influent flow
Demand + In-pla
of Facilities
e WTP from
on treatment
WTP has cons
though conc
nit process is
and Floccula
coagulant (N
the flocculat
matic coagul
in a single, f
ring are used
asin is 48 ft l
t. California
ading limits.
of 10-30 min
re summariz
T

Y OF ANGELS

JECTED WA
Projected W
Dem
ADDc
(gpd)
M
(g
864,000 1
1,069,000 1
1,324,000 2
2,084,000 3
meter (upper pla
ant Process Dem
m PG&E in 1
and disinfec
sistently com
erns have be
s presented b
ation
NTU Techno
tion basin. A
lant dose adj
four-stage ba
d to achieve a
long and 12
surface wat
. Optimal flo
nutes [30]. E
zed in Table
Chapte
7-3
n:\m
TABLE 7-1

S WATER MA

ATER DEMAN
WTP Influent
manda
MDDd
gpm)
PHD
(gpm
,320 2,24
,633 2,77
2,023 3,43
,184 5,41
ant meter).
mand at 70 gpm (
984. In gene
ction with so
mplied with a
een raised re
below.
ologies 935)
A streaming c
justments. T
asin with a ro
a paddle spe
ft wide, with
ter treatment
oc formation
stimated det
7-2 and sug
er 7: Water
mtb020401\docume

ASTER PLAN

NDS FOR WT
t
W
De
m)
A
(g
44 964
76 1,16
39 1,42
13 2,18
(100,800 gpd).
eral, the WT
odium hypoc
applicable st
egarding cap
) is injected i
current cont
The WTP is e
otating padd
eed of approx
h three inter
t regulations
n, however, t
tention times
ggest that the
Wa
Treatment P
ents\_water master
N

TP EVALUAT
WTP Unit Pro
(Including In
Dem
ADD
gpd)
MD
(gp
4,800 1,3
69,800 1,7
24,800 2,0
84,800 3,2
TP is equippe
chlorite solut
tate and fede
acity and rel
into raw wat
troller is used
equipped wit
dle assembly
ximately 9 r
rior baffles a
do not inclu
typically req
s under curre
e capacity of
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
TION
ocess Demand
-plant Process
mand )
DDd
pm)
PHD
(gpm
390 2,31
703 2,84
093 3,50
254 5,48
ed for
tion. For mo
eral drinking
liability. An
ter between t
d for proces
th two coagu
y. An electric
revolutions p
and a water d
ude flocculat
quires gentle
ent and proje
f the existing
ngels
Plan
uation
020401
mp.docx
db
s
De
m)
14 46
09 83
ore
g
the
s
ulant
c
per
depth
tion
ected
g
Angels WM
July 2013
flocculat
needed to
from serv
reliability
when the
b. S
Water flo
sediment
approxim
basin und
that the c
surface w
limits, bu
800-1,20
The sedim
modern d

1. L
re
st
MP
ion basin wi
o allow the W
vice for main
y should the
e water level
WTP
edimentation
ows from the
tation basin i
mately 310,0
der current a
capacity of th
water treatme
ut typical des
00 gallons pe
WTP
mentation ba
design featur
Lack of autom
emoved from
tock pond on
ill be adequa
WTP to cont
ntenance or
need for un
in the treate
CITY

P FLOCCULA
Dem
Base Year
10-year M
20-year M
n
e flocculatio
is 100 ft long
00 gallons. E
and projected
he existing s
ent regulatio
sign surface
er day per sq
CITY

SEDIMENTA
Dem
Base Year
10-year M
20-year M
asin was con
res. Major is
matic sludge
m service, dr
n a neighbor
ate through 2
tinue operati
repairs. The
scheduled re
ed water stor
T

Y OF ANGELS

ATION BASIN
mand Conditio
MDD (2011)
DD (2021)
DD (2031)
n basin into
g and 38 ft w
Estimated su
d demand co
sedimentatio
ons do not in
loading rate
quare foot (gp
T

Y OF ANGELS

ATION BASIN
mand Conditio
r MDD (2011)
MDD (2021)
MDD (2031)
nstructed wh
ssues and con
e removal sy
rained, and m
ring ranch. T
Chapte
7-4
n:\m
2031. A seco
ing when the
standby floc
epairs arise d
rage tank is l
TABLE 7-2

S WATER MA

N HYDRAUL
on
Es
a single, gu
wide (at top)
urface loadin
onditions are
on basin will
nclude sedim
es for sedime
pd/ft2) [30].

TABLE 7-3

S WATER MA

N HYDRAUL
on
Es
Loa
hen the WTP
ncerns are li
stem. Period
manually cle
The cleaning
er 7: Water
mtb020401\docume
ond flocculat
e existing flo
cculation ba
during highlow.

ASTER PLAN

LIC LOADING
stimated Deten
Time, minute
28 23
19 unite-lined se
), with slope
ng rates for t
e summarize
be adequate
mentation pro
entation basi

ASTER PLAN

LIC LOADIN
stimated Surf
ading Rate, gp
530
650
800
P was under P
isted below.
dically, the s
aned. Sludg
procedure i
Wa
Treatment P
ents\_water master
tion basin, h
occulation ba
asin would p
-demand per
N

G SUMMARY
ntion
es
edimentation
d walls and
the existing s
d in Table 7
e through 20
ocess criteria
ins are in the
N

G SUMMARY
face
pd/ft2
PG&E owne
sedimentatio
e and wash w
s time-consu
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
however, is
asin is remov
rovide addit
riods or at tim
Y
n basin. The
a capacity o
sedimentatio
7-3 and sugge
031. Californ
a or loading
e range of
Y
ership and la
n basin mus
water flow i
uming and la
ngels
Plan
uation
020401
mp.docx
ved
tional
mes
of
on
est
nia
acks
t be
nto a
abor-
Angels WM
July 2013
in
pr

2. S
th
re

3. S
en
pr
U
w
w

4. S
hy
d
bu
c. F
Filtration
cells. The
Condition
shall not
(with one
As menti
represent
of future
1,440 gpm
considera
with one
planning
Table 7-4
MP
ntensive, and
rogress.
tructural det
he basin. In 2
epair two cra
ingle point o
ntire facility
rogress. Cer
Unscheduled
which the wa
water service
hort-circuiti
ydraulic sho
ownstream t
ut the shortiltration
n is achieved
e maximum
n No. 10 of
exceed 1,44
e filter out o
ioned previo
ts a significa
increases in
m could be e
ation by the
filter out of
horizon). A

4. d the WTP c
terioration. W
2011, in resp
acks.
of failure. Be
y must be shu
rtain mainten
repairs, whi
ater level wit
interruption
ing. Perform
ort-circuiting
treatment un
circuiting pr
d at the WTP
filtration ca
the City’s w
40 gpm [23]
f service).
ously, sodium
ant amount o
n water dema
exceeded at
City. The fo
f service, wh
A summary o
annot produ
With age, lar
ponse to CD
ecause the W
ut down whe
nance events
ich could be
thin the treat
ns.
mance of the s
g. As a result
nits increases
roblem persi
P with three p
apacity of eac
water supply
which is the
m hypochlori
of flow proce
ands, under c
MDD in 1-2
ourth filter w
hich would no
f the MDD p
Chapte
7-5
n:\m
uce water wh
rge cracks ha
PH inspectio
WTP lacks m
en sedimenta
s can be sche
needed duri
ted water sto
sedimentatio
t, settling tim
s. The basin
ists.
pressure filte
ch filter is li
permit, the m
e capacity of
ite added to
essed by the
current oper
2 years. Insta
would bring t
ot be exceed
projections a
er 7: Water
mtb020401\docume
hile sediment
ave develope
on findings
multiple para
ation mainte
eduled durin
ing high-dem
orage tank is
on basin is a
me is reduced
has been ret
ers, each wit
mited to 720
maximum fl
f two pressur
the headwor
pressure filt
ations the fil
allation of a
the total filtr
ded until 203
and filtration
Wa
Treatment P
ents\_water master
tation basin
ed in the wa
[15], a seala
llel sedimen
enance and re
ng lower-dem
mand period
low, could r
adversely aff
d, and the so
trofitted with
th four 60 sq
0 gpm. Acco
low rate thro
re filters ope
rks and prior
ters. Depend
ltration capa
fourth filter
ration capaci
33 (beyond t
n capacities i
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
cleaning is i
alls and floor
ant was used
ntation units,
epairs are in
mand periods
s or at times
result in City
fected by
olids loading
h baffle curt
quare foot (f
ording to
ough the WT
erating in par
r to filtration
ding on the p
acity of
r is under
ity to 2,160 g
the 20-year
is provided i
ngels
Plan
uation
020401
mp.docx
in
r of
to
, the
n
s.
s in
y
g on
ains,
ft
2 )
TP
rallel
n
pace
gpm
in
Angels WM
July 2013
Followin
the 10-ye
d. D
Sodium h
injected u
and the s
storage ta
The on-s

0.8 perce
1,000 gal
Accordin
months, o
two days
The disin
Giardia i
concentra
regulatio
by the th
were grea
limits for
byproduc
MP
Base
10-y
20-y
Curr
Curr
Futu
Futu
a
See
b
Cap
ng installatio
ear and 20-y
Disinfection
hypochlorite
upstream of
torage tank.
ank, respecti
ite sodium h
ent sodium h
llon tank [8]
ng to City sta
often genera
s.
nfection equi
nactivation;
ation throug
ns. Operatio
ird objective
ater than 10
r disinfection
ct precursors
CITY
WT
e Year MDD (2
year MDD (202
year MDD (203
rent Operation
rent Operation
ure Operation (
ure Operation:
e Table 7-1. Incl
pacity with one f
n of the four
ear MDD pr
e solution is
the filters fo
Short-circui
ively, when
hypochlorite
hypochlorite
]. The WTP
aff, the gene
ating sodium
ipment is op
2) ≥2-log10
hout the dist
onal records
e. Throughou
times the re
n byproducts
s.

T

Y OF ANGELS

P FILTRATI
Item
2011), gpma
21), gpma
31), gpma
(3 filters): Ma
: Year that Cap
(4 filters): Max
Year that Capa
udes 70 gpm of
filter out of serv
rth filter, the
rojections.
generated at
or disinfectio
iting (T10/T)
calculating p
solution gen
solution per
is equipped
erator functio
m hypochlorit
perated to sim
virus inactiv
tribution sys
suggest that
ut 2011, calc
equired rates
s (trihalomet
Chapte
7-6
n:\m
TABLE 7-4

S WATER MA

ON SYSTEM
aximum Capaci
pacity will be E
ximum Capacit
acity will be Ex
in-plant process
vice.
e filtration sy
t the WTP an
on. Disinfect
) factors of 0
pathogen ina
nerator is cap
r hour, and th
with two sod
ons at capaci
te solution w
multaneously
vation; 3) ma
stem; and 4)
t disinfection
culated inact
. Over the sa
thanes and h
er 7: Water
mtb020401\docume

ASTER PLAN

M CAPACITY
ity, gpmb
Exceeded
ty, gpmb
xceeded
s water.
ystem will ha
nd, under no
tant contact

0.7 and 0.3 a
activation ra
pable of pro
he 0.8 perce
dium hypoch
ity during hi
without stopp
y achieve fou
aintain a det
comply with
n process con
tivation rates
ame period,
haloacetic ac
Wa
Treatment P
ents\_water master
N
Value
1,390
1,703
2,093
1,440
2013
2,160
2033
ave sufficien
ormal operati
is provided
are applied to
ates.
oducing 62.5
nt solution i
hlorite solut
igher-deman
ping for peri
ur objective
tectable resid
h disinfectio
ntrol is, in g
s for Giardia
the WTP co
cids) and dis
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
nt capacity f
ing conditio
within the fi
o the filters a
gallons of
is stored in a
tion feed pum
nd summer
iods in exces
s: 1) ≥0.5-lo
dual chlorine
on byproduct
general, gove
a and viruses
omplied with
infection
ngels
Plan
uation
020401
mp.docx
for
ns,
ilters
and
a
mps.
ss of
og10
e
ts
erned
s
h
Angels WM
July 2013
e. T
Followin
City’s di
water sys
interrupti
operation
would all
The capa
Californi
Californi
source ca
minimum
according
of storag
demand c
required
SY
B
1 2
a
b
The City
sum of th
storage re
demand c
MP
Treated Wate
ng the pressu
stribution sy
stem, the Cit
ions, CDPH
n in parallel
low City sta
acity of the fu
ia Waterwor
ia Waterwor
apacity, stora
m volume of
g to Conditio
e requiremen
conditions is
by Californi

STEM STOR
Demand C
Base Year (201
10-year (2021)
20-year (2031)
a
California Wat
b
Condition No.
must be mainta
2010 Impro
he required f
equirements
conditions is
er Storage
ure filters, wa
ystem by gra
ty water syst
staff sugges
with the exi
aff to remove
future storage
rks Standards
ks Standards
age capacity
f 937,500 gal
on No. 9 of t
nts meeting
s provided in
ia Waterwor
CITY

RAGE REQUI
ondition
11)
)
)
terworks Standar
9 of the City’s 2
ained for disinfec
ovement Stan
fire storage,
s meeting the
s provided in
ater is routed
avity. With o
tem lacks red
sted that the
sting storage
e a tank from
e tank shoul
s [10] and th
s require tha
y, and/or eme
llons is requi
the City’s 20
the Californ
n Table 7-5.
rks Standard
T

Y OF ANGELS

REMENTS F
Storage R
for Cali
Waterworks
(ga
555,3
683,
842,0
rds = 4 hours of
2003 permit ame
ctant contact tim
ndards requi
operational
e City 2010 I
n Table 7-6.

Chapte
7-7
n:\m
d into a sing
only one trea
dundancy an
City constru
e tank [11]. T
m service for
d satisfy the
he City 2010
at the system
ergency sour
ired in the ta
003 water su
nia Waterwo
As shown in
s at the 20-y
TABLE 7-5

S WATER MA

FOR CALIFO
Required
ifornia
Standardsa
al)
360
143
093
PHD (including
endment states th
me [6].
ire storage ca
storage, and
Improvemen
er 7: Water
mtb020401\docume
gle 2.5 MG st
ated water sto
nd reliability
uct an additi
The addition
r maintenanc
e greater of th
0 Improveme
m be able to m
rce connecti
ank for chlor
upply permit
rks Standard
n Table 7-5,
year demand

ASTER PLAN

RNIA WATE
Minimum
Chlorine Co
Volume
(gal)
937,500
937,500
937,500
g in-plant proces
hat a minimum v
apacity be g
d emergency
nt Standards
Wa
Treatment P
ents\_water master
torage tank t
orage tank fo
y. To avoid s
onal storage
n of a second
ce or repairs.
he requirem
ent Standard
meet four ho
ons [10]. In
rine contact
t amendment
ds for curren
the minimu
d condition is
N

ERWORKS ST
m
ontact
e
b
T
Re
St
(
0 0
0 s demands) [10]
volume of 937,5
greater than o
storage [16]
for current
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
that feeds th
for the entire
service
e tank for
d storage tan
.
ments of the
ds [16]. The
ours of PHD
addition, a
volume
t [6]. A sum
nt and projec
um storage
s 1.8 MG.

TANDARDS
Total
equired
torage
(MG)

1.5 1.7

1.8 ].
00 gallons
or equal to th
]. A summar
and projecte
ngels
Plan
uation
020401
mp.docx
he
nk
with
mmary
cted
he
ry of
ed
Angels WM
July 2013
Dem
Base Year
10-year (2
20-year (2
a
Fire stora
industrial
b
Operation
c
Emergenc
d
Condition
for disinf
As shown
at the 20-
of 2.3 MG
and repai
If an alte
minimum
Based on
requirem
further di
f. T
Finished
single we
the existi
transmiss
fail, the C
the City n
[11].

The para
greater o
fire flow
of require
provided
MP

SYSTEM ST
mand Conditio
r (2011)
2021)
2031)
age = maximum
l) for a 2 hour du
nal storage = 20%
cy storage = 4 ho
n No. 9 of the Ci
fectant contact ti
n in Table 7
-year deman
G is recomm
irs if the sec
rnative locat
m chlorine co
n the 20-year
ment or in pla
iscussed in C
Transmission
water from
elded steel tr
ing transmis
sion main is
City would b
needs an add
llel transmis
f PHD or fir
of 2,000 gp
ements for s
d in Table 7-7
CITY

TORAGE RE
on
F
Sto
(
24 24
24 fire flow conditi
uration.
% of MDD (incl
ours of MDD (in
ity’s 2003 permi
ime [6].
-6, the minim
nd condition
mended for re
ond tank is c
tion (i.e., no
ontact volum
r demand co
ant process d
Chapter 9.
n
the treated w
ransmission
sion main is
50-60 years
be unable to
ditional trans
ssion main sh
re flow plus
m, the 20-ye
sizing of the

7. T

Y OF ANGELS

QUIREMENT
Fire
orage
a
gal)
Op
S
0,000 4
0,000 4
0,000 6
ion of 2,000 gpm
luding in-plant p
ncluding in-plant
it amendment sta
mum storage
is 2.3 MG. A
edundancy t
constructed a
ot at the WTP
me requireme
ndition, the
demands is a
water storage
main that is
s unknown bu
s old and in p
supply wate
smission ma
hould be siz
MDD. The 2
ear projectio
parallel tran
Chapte
7-8
n:\m
TABLE 7-6

S WATER MA

TS FOR CITY
erational
torage
b

(gal)
E
400,320
490,520
602,720
m (multiple resid
process demands
t process deman
ates that a minim
e required by
A second tre
to avoid serv
at or near th
P site) is sele
ent and in-pl
minimum st
approximatel
e tank is fed
approximat
ut is believe
poor conditio
er to its custo
ain in paralle
ed to meet v
20-year proj
on for fire flo
nsmission ma
er 7: Water
mtb020401\docume

ASTER PLAN

Y IMPROVEM
Emergency
Storagec

(gal)
C
333,600
408,767
502,267
dential, three stor
s).
nds).
mum volume of 9
y the City 20
eated water s
vice interrup
e WTP.
ected for the
lant process
torage volum
ly 1.4 MG. T
to the City’
tely 3,508 ft
ed to be 10-in
on [5]. If the
omers. CDPH
el with the ex
velocity and
ection for PH
ow plus MDD
ain based on
Wa
Treatment P
ents\_water master
N

MENT STAN
Minimum
Chlorine Con
Volumed
(gal)
937,500
937,500
937,500
ries, heavy comm
937,500 gallons
010 Improve
storage tank
tions during
e second stor
demands do
me without a
Tank site alte
s distributio
in length. T
nches or 14-
e transmissio
H staff has c
xisting trans
head loss cr
HD is 3,439
D is 4,023 g
n fire flow pl
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
NDARDS
m
ntact
Tot
Requi
Stora
(MG

2.0 2.1

2.3 mercial, or heav
must be mainta
ement Standa
with a volum
g maintenanc
rage tank, th
o not apply.
a chlorine co
ernatives are
on system via
he diameter
-inches. The
on main wer
commented t
mission mai
riteria for the
9 gpm. Using
gpm. A summ
lus MDD is
ngels
Plan
uation
020401
mp.docx
tal
ired
age
G)
0 1
3 vy
ined
ards
me
ce
he
ontact
e
a a
of
re to
that
in
e
g a
mary
Angels WM
July 2013
As shown
criteria. B
for the pa
2011 Wa
need for
g. B
Currently
a stock p
The follo
documen
supernata
from the
capacity
wastewat
would al
Under Al
WTP fac
backwash
Sediment
short-circ
recycle p
flow from
10 percen
minor an
MP
20-ye
Maxi
Minim
Maxi
Minim
a
Fire
b
Velo
c
Max
length
n in Table 7
Because a 16
arallel water
ater Audit [6
reliability, s
Backwash W
y, filter back
ond on a nei
owing two al
nts [3, 6]: 1)
ant to the he
WTP to a po
in the City w
ter treatment
so significan
lternative 1,
cilities. The c
h water and
tation would
cuiting. Supe
pump station
m the sludge
nt of the tota
nd will not be
CITY

SIZING OF
ear Projection o
mum Velocity
mum Pipe Diam
mum Head Lo
mum Pipe Diam
flow of 2,000 gp
ocity criteria per
ximum head loss
h of 3,508 ft.
-7, the minim
6-inch diame
r transmissio
]. The additi
ecurity, and
ater and Slu
kwash water
ighboring ra
lternative str
construction
ad of the WT
oint within t
wastewater c
t facility, Al
ntly increase
two lined sl
capacity of e
water from s
d occur in th
ernatant wou
n. The pump
e lagoons to t
al plant influ
e a factor in
T

Y OF ANGELS

PARALLEL
Item
of Fire Flow +
y for Short Dura
meter to Meet
ssc
, ft
meter to Meet
pm + MDD of 2
Table 4-2.
criteria of 10 ft
mum pipe di
eter pipeline
on main is 18
ion of a para
system redu
udge Handlin
and water fr
anch. The sto
rategies have
n of sludge la
TP; and 2) c
the City was
collection sy
lternative 1 i
e the efficien
ludge lagoon
each lagoon w
sedimentatio
e sludge lag
uld flow from
station woul
the head of t
uent flow. (T
determining
Chapte
7-9
n:\m
TABLE 7-7

S WATER MA

WATER TRA
MDD (2031),
ationsb, fps
Velocity Criter
Head Loss Cri
,023 gpm (per T
per 1,000 ft (per
iameter is co
e is a less com
8-inches, con
allel water tr
undancy.
ng
rom sedimen
ock pond in t
e been identi
agoons and a
construction
tewater colle
ystem and po
is recommen
ncy of the W
ns would be
would be ap
on basin clea
oons, and ba
m the sludge
ld be equipp
the WTP. Th
The flow of p
g the recycle
er 7: Water
mtb020401\docume

ASTER PLAN

ANSMISSION
gpma
ria, in
iteria, in
Table 7-1) for 20
r Table 4-2) and
ontrolled by
mmon size, t
nsistent with
ansmission m
ntation basin
turn can disc
ified and dis
a pump stati
of a sludge p
ection system
otential adve
nded. Implem
WTP.
constructed
pproximately
aning would
affles would
e lagoons to
ped with a flo
he recycled w
process wate
d water flow
Wa
Treatment P
ents\_water master
N
N MAIN
Value
4,023
12 12
35 16
0-year projection
d a total pipe
the head los
the recomme
h the suggest
main addres
n cleaning is
charge to Ch
scussed in pr
ion to recycl
pipeline and
m. Due to a
rse effects o
mentation of
adjacent to
y 500,000 ga
d flow to the
d be provided
the wet well
ow meter to
water flow s
er to the head
w.) Proper de
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
n.
ss evaluation
ended diame
tion in the
sses a critical
discharged
herokee Cree
revious
le sludge lag
d appurtenan
lack of avai
on the City
f Alternative
the existing
allons. Filter
sludge lagoo
d to prevent
l of a duplex
monitor the
should not ex
d of the WTP
esign, operat
ngels
Plan
uation
020401
mp.docx
n
eter
l
into
ek.
goon
nces
lable
1 r
ons.
x
e
xceed
P is
tion,
Angels WM
July 2013
and main
eliminate
Periodica
allowed t
destinatio

7.3 C
In genera
parallel b

1. F

2. S

3. S

4. T
Treated w
The City
Addition
The follo
difficulti

1. R
sl

2. C
d
C
C
A WTP p
the neces
issues:

1. F

2. S
MP
ntenance of t
e the need fo
ally, on a rot
to dry. Dried
on.

Conclusions
al, the WTP
backup units
locculation b
edimentation
torage tank
Transmission
water deman
should com
nal on-site so
owing needs
es:

Replacement
ludge remov
Construction
ischarges of
Control Board
Cherokee Cre
process flow
ssary improv
ourth filter
ludge lagoon
the lagoons a
or National P
tating basis,
d sludge wou
and Recom
lacks redund
to use while
basin
n basin
n main from
nd projection
mplete design
odium hypoc
have been id
of the existi
val system.
of sludge la
ffsite and pot
d triggered b
eek could be
w diagram sh
vement proje
ns, recycle p
and recycle p
Pollutant Dis
sludge lagoo
uld be remov
mmendations
dancy. The f
e maintenan
WTP to dist
ns indicate th
n of the fourt
chlorite gene
dentified con
ing sediment
agoons, a rec
tential regula
by releases to
e subject to a
owing neces
ects, the follo
pump station
Chapte
7-10
n:\m
pump station
scharge Elim
ons would b
ved and haul
s
following W
ce and repai
tribution sys
hat a fourth f
th filter proje
eration capac
nsidering cu
tation with a
cycle pump s
atory issues
o Cherokee
administrativ
ssary improv
owing addre
n, and appurt
er 7: Water
mtb020401\docume
n should pre
mination Syst
e removed f
led to a land
WTP elements
ir operations
stem
filter could b
ect and proc
city will also
urrent operat
a modern un
station, and a
with the Re
Creek. Non
ve civil liabil
vements is p
ess possible r
tenances
Wa
Treatment P
ents\_water master
event dischar
tem (NPDES
from service
dfill or other
s were const
s are in progr
be required i
ceed with con
o be required
tional practic
it that is equ
appurtenanc
gional Wate
n-permitted r
lities.
resented in F
regulatory co
City of A
Water Master
Plant Evalu
MTB0
r plan\final\0713 m
rges and
S) permitting
, drained, an
approved
tructed witho
ress:
in the near fu
nstruction.
d.
ces and
uipped with a
es to elimina
er Quality
releases to
Figure 7-2. O
ompliance
ngels
Plan
uation
020401
mp.docx
g.
nd
out
uture.
a
ate
Of

Angels WM
July 2013
8Hy
Sy
The purp
various d
scenarios
distributi
water dem

8.1 S
Land use
hydraulic
the City l
[6], are p
A summa
presented
designate
the analy
MP
ydraul
ystem
pose of this c
demand scen
s will be use
ion system. T
mands and a
tudy Area a
e data for the
c model. The
limits. Wate
presented in F
ary of existin
d in Table 5-
ed as ROW a
ysis of existin
lic Eva
chapter is to
narios under
d to develop
The develop
assumed pipe
and Existing
e City provid
e furnished d
r distribution
Figure 8-1.
ng develope
-2 and Figur
and OS were
ng demands.
aluation
execute a w
existing dev
p recommend
ment and ca
eline friction
g Land Use
ded in GIS fo
data encomp
n system pre
d land uses (
re 5-1, is also
e assumed to
.
8-1
n:\m
n of Ex
water distribu
velopment co
ded capacity
alibration of
n factors are
ormat were u
passed a total
essure zones
(including p
o presented i
o have no wa
mtb020401\docume
xisting
ution system
onditions. Th
y improveme
the hydrauli
also discuss
utilized for t
l area of app
s, identified i
artially deve
in Table 8-1
ater demand
ents\_water master
g Distri
hydraulic m
he results of
ent projects f
ic model usin
sed.
the calibratio
proximately
in the 2011 W
eloped areas
for referenc
ds and were n
MTB0
r plan\final\0713 m
ibution
model for
f the model
for the
ng calculate
on of the
2,280 ac wit
Water Audit
), previously
ce. Parcels
not included
020401
mp.docx
n
d
thin
t
y
d in

ZONE E ZONE D ZONE B ZONE C ZONE A ZONE E LEGEND PRESSURE ZONE BOUNDARY PRESSURE REDUCING VALVE City of Angels
Water Master Plan
Chapter 8: Hydraulic Evaluation of Existing Distribution System Angels WMP 8-3 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 8-1

CITY OF ANGELS WATER MASTER PLAN

DEVELOPED LAND USE SUMMARY
Land Use Description
Number of
Parcelsa
Total
Developed
Areaa (ac)
Residential
HDR High-Density Residential 128 80
MDR Medium-Density Residential 68 51
RE Residential Estates 10 14
SFR Single-Family Residential 1,190 372
HDR-WMC Worldmark Club 19 21
Commercial
BAE Business Attraction/Expansion 21 26
CC Community Commercial 101 65
HC Historic Commercial 79 16
SC Shopping Commercial 39 32
Industrial
I Industrial 5 16
Public
P Public 22 28
P (WWTP) Public (Wastewater Treatment Plant) 2 18
P-SCH Public School 8 50
PR Parks and Recreation 9 18
PR-Golf Golf Course 5 144
Other
SP Special Planning 1 4
OS Open Space 5 12
ROW Right-of-Way 154 216
Total 1,866 1,183
a Includes partially-developed land uses.

Angels WM
July 2013

8.2 S
As discu
2007-201
for indivi
La
Resid
HD
MD
RE
SF
HD
Comm
BA
CC
HC
SC
Indus
I
Publi
P
P (
P-S
PR
Other
SP
a
Conv
b
Dem

8.3 E
The exist
pipelines
approxim
MP
ummary of
ssed in Chap
11 average w
idual parcels
and Use
dential
DR
DR
E
FR
DR-WMC
mercial
AE
C
C
C
strial
ic
(WWTP)
SCH
R
r
P
version factors p
mand factor per T
Existing Dist
ting water di
s with diame
mately 300 hy
Cha
f Water Dem
pter 5, existin
water use. W
s were applie
CITY
SUMMAR
Conversi
(EW
Existing

5.0 3.0

2.0 4.0

9.5 2.0

2.0 2.0

2.0 2.0

5.0 5.0

10.0 4.0

1.5 per Table 5-12.

Table 5-13.
tribution Sy
istribution sy
ters ranging
ydrants, 30 A
apter 8: Hyd
mands by La
ng and futur
Water demand
ed to the nea
TA

OF ANGELS

RY OF WATE
ion Factora,b
WU/ac)
Future

15.0 10.0

0.5 6.0

9.5 1.0

15.0 15.0

15.0 2.0

5.0 0.0

10.0 4.0

1.5 ystem
ystem consis
from 2-inch
ARVs, 14 bl
draulic Eval
8-4
n:\m
and Use Typ
re demands f
ds by land us
arest point (n
ABLE 8-2

S WATER MA

ER DEMAND
Dem
Facto
(gpd/E
25 25
25 25
25 25
25 25
25 25
25 25
25 25
25 sts of approx
hes to 14-inc
lowoff valve
luation of E
mtb020401\docume
pe
for the system
se are presen
node) on the

ASTER PLAN

DS BY LAND
mand
or
a,b
EWU) E
55 55
55 55
55 55
55 55
55 55
55 55
55 55
55 ximately 167
ches. The sys
es, ten PRVs
Wa
Existing Dist
ents\_water master
m were deve
nted in Table
e distribution
N
USE
Deman
(gpd/a
Existing
1,275
765
510
1,020
2,423
510
510
510
510
510
1,275
1,275
2,550
1,020
383
7,000 lineal
stem include
s, and one su
City of An
ater Master P
tribution Sys
MTB0
r plan\final\0713 m
eloped from
e 8-2. Dema
n system.
nd
ac)
Future
3,825
2,550
128
1,530
2,423
255
3,825
3,825
3,825
510
1,275
0 2,550
1,020
383
feet (LF) of
es
urge valve.
ngels
Plan
stem
020401
mp.docx
m
ands
Angels WM
July 2013
For mode
4-inch to
presented

8.4 H
This sect
a. M
A model
(version
distributi
calibratio
PHD con
b. P
GIS data
ARVs, an
(USGS) m
obtain pi
than 90 p
c. D
GIS parc
network.
the hydra
MP
eling purpos
o 14-inch pip
d in Figure 8
Hydraulic M
tion will desc
Modeling Sof
of the existi
8i). The soft
ion network
on of the hyd
nditions was
hysical Data
provided by
nd hydrants.
maps and ae
pe invert ele
percent, by le
Demand Inpu
cel maps wer
Parcels with
aulic model,
Cha
ses, only the
pelines, 262 h
8-2.

Model
cribe the sof
ftware
ing distributi
tware can an
under steady
draulic mode
conducted.
a
y the City in
. Ground ele
erial imagery
evations. The
ength, of the
uts
re reviewed t
hin each loca
based on de
apter 8: Hyd
water distrib
hydrants, an
ftware used t
ion network
nalyze hydra
y-state and e
el, analysis o
cluded the lo
evations were
y. Pipe cover
e extents of t
e entire City
to establish l
al service ar
emands prese
draulic Eval
8-5
n:\m
bution trunk
nd ten PRVs
to develop th
was created
aulic perform
extended per
of a steady st
ocation and
e determined
r was assum
the modeled
water system
local water s
rea were used
ented in Tab
luation of E
mtb020401\docume
k network, co
was analyze
he distributio
d using Bent
mance and w
riod (non-ste
tate model u
size (diamet
d from Unite
ed to be an a
d distribution
m.
service areas
d to establish
ble 8-2.

Wa
Existing Dist
ents\_water master
onsisting of
ed. This trun
on network m
ley Haestad
ater quality
eady) conditi
under ADD,
ter) of pipeli
ed States Ge
average dept
n network in
s along the d
h water dem
City of An
ater Master P
tribution Sys
MTB0
r plan\final\0713 m
154,900 LF
nk network is
model.

WaterCAD
behavior of
ions. For
MDD, and
ines, PRVs,
eological Sur
th of 3 ft to
nclude greate
distribution
mand loading
ngels
Plan
stem
020401
mp.docx
of
s
a
rvey
er
g for
ZONE D ZONE B ZONE C ZONE A ZONE E LEGEND 4-INCH DIAMETER PIPELINE 6-INCH DIAMETER PIPELINE 8-INCH DIAMETER PIPELINE 10-INCH DIAMETER PIPELINE 12-INCH DIAMETER PIPELINE 14-INCH DIAMETER PIPELINE PRESSURE ZONE BOUNDARY FIRE HYDRANT AIR RELEASE VALVE BLOWOFF VALVE PRESSURE REDUCING VALVE SURGE VALVE Angels WM
July 2013

8.5 C
This sect
a. T
As pipeli
performa
the Haze
values co
The 2011
distributi
Table 8-3
available
b. A
The City
January 2
August a
pressures
an averag
degradati
present w
reviewed
Hydrant
model re
MP
Calibration o
tion will desc
Typical Fricti
ines age, det
ance. The hy
n-Williams
orrespond to
1 Water Aud
ion system p

3. A conserv
e.

Pressure
Zone
A
B
C
D
E
Applied Frict
provided da
2012. Updat
and Septemb
s (before hyd
ge C value, b
ion. Because
when the hyd
d to confirm
test location
sults are pre
Cha
of the Hydr
cribe the me
ion Coefficie
terioration th
ydraulic cond
equation wh
lower pipe f
dit [6] provid
pressure zone
vative C valu
CITY

PIPELINE M
Not Specifi
50 year old
steel, ductil
50 year old
steel, ductil
10-20 year
10-20 year
tion Coeffici
ata from thre
ed static pre
er 2012, wer
drant flow) o
by zone, obt
e it is not kn
drant tests w
calibration w
ns are presen
esented in Ta
apter 8: Hyd
raulic Mode
ethodology f
ents
hrough norm
dition of a pi
hich is prima
friction, low
ded general p
es. Existing p
ue of 110 is a
TA

OF ANGELS

MATERIALS A
Pipe Mater
ied
asbestos ceme
le iron, or galv
asbestos ceme
le iron, or galv
old C900 PVC
old C900 PVC
ients for Mo
ee fire hydra
essure test re
re provided
observed at e
ained from T
own which f
were performe
within an acc
nted in Figure
able 8-4. Flo
draulic Eval
8-7
n:\m
el
for water mo
mal use may r
ipeline is bes
arily a functi
wer head loss
pipeline age
pipe materia
assumed wh
ABLE 8-3

S WATER MA

AND FRICTI
rial
ent, spiral weld
anized steel
ent, spiral weld
anized steel
C
C
del Calibrati
ant flow tests
sults for two
by City staff
each location
Table 8-3 wh
flow conditi
ed, model re
ceptable mar
e 8-3. Static
ow test repor
luation of E
mtb020401\docume
odel calibrati
result in cha
st expressed
on of pipe m
s, and improv
and materia
als and typic
here pipeline

ASTER PLAN

ION COEFFIC
Typical
Range
1 d
d
ion
s performed
o of the fire h
ff. To calibra
n were comp
hich would i
ons (ADD, M
esults for all
rgin of error
pressure da
rts are provid
Wa
Existing Dist
ents\_water master
ion.
anges to hydr
d by the coef
material and
ved hydrauli
al characteris
cal C values
information
N
CIENTS
l Friction Coef
e (Hazen-Will
C value)
110 (Assumed)
110-120
110-120
120-130
120-130
between Oc
hydrants, pe
ate the mode
pared to mod
indicate norm
MDD, of PH
flow scenar
r (±10 percen
ata, flow data
ded in Appen
City of An
ater Master P
tribution Sys
MTB0
r plan\final\0713 m
raulic
fficient C wit
age. Higher
ic performan
stics for the
are presente
n is not
fficient
liams
)
ctober 2010 a
erformed in
l, static
del results us
mal
HD) were
rios were
nt).
a, and calibra
ndix I.
ngels
Plan
stem
020401
mp.docx
thin
C
nce.
ed in
and
sing
ated
City of Angels
Water Master Plan
Chapter 8: Hydraulic Evaluation of Existing Distribution System Angels WMP 8-8 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 8-4

CITY OF ANGELS WATER MASTER PLAN

FIRE HYDRANT FLOW TEST AND MODEL CALIBRATION DATA
Hydrant ID
Test
Month
Pressure
Zone
Test
Value
Model % Diff.

ADDa MDDb ADDa MDDb
Static Pressure (psi)
A1-FH-113 Oct. 2010 B 120 psi 108 psi 102 psi -9.9% -14.8% C2-FH-100 Aug. 2012 B 108 psi 98 psi 92 psi -9.4% -14.8% C2-FH-117 Sep. 2012 B 87 psi 90 psi 79 psi 3.9% -9.8%
Hydrant Flow (gpm) c

A1-FH-113 Oct. 2010 B 2,165 gpm 2,132 gpm 1,796 gpm -1.5% -17.0% a
ADD conditions.
b
MDD conditions.
c Hydrant flow only available for Oct. 2010 test of Hydrant A1-FH-113.

Based on the results presented in Table 8-4, it is likely that ADD flow conditions were present for the October 2010 and August 2012 hydrant flow tests. ADD or MDD flow conditions were likely present for the September 2012 hydrant flow test.

A1-FH-1113 120 psi, static
2,165 gpm October 2010 C2-FH-100 108 psi, static
August 2012 C2-FH-117 87 psi, static
September 2012 ZONE E ZONE D ZONE B ZONE C ZONE A LEGEND PRESSURE ZONE BOUNDARY WATER DISTRIBUTION SYSTEM NETWORK FIRE HYDRANT TESTED FIRE HYDRANT AIR RELEASE VALVE BLOWOFF VALVE PRESSURE REDUCING VALVE SURGE VALVE Angels WM
July 2013
The calib
and indic
other pre
distributi
material.

Approxim
recent co
construct

8.6 S
Using fri
model wa
and futur
hydraulic
MP
brated C valu
cates typical
essure zones
ion system p
Applied fric
mately 6,180
onstruction b
ted C900 PV
cenarios An
iction coeffic
as analyzed
re (buildout)
c model scen
Cha
ue of 115 for
pipe degrad
is not availa
perform simi
ction coeffic
CITY
AP
0 LF of 8-inc
by the City, i
VC.
nalyzed with
cients and de
to evaluate t
demand sce
narios are pr
apter 8: Hyd
r Zone B is w
dation from n
able for analy
larly within
cients for all
TA

OF ANGELS

PPLIED FRIC
Pressure
Zone
A
B
C
D
E
ch to 12-inch
is assumed to
h Hydraulic
emand facto
the condition
enarios. Deta
esented in T
draulic Eval
8-10
n:\m
within the ra
normal use. B
ysis, it is ass
the respectiv
pressure zon
ABLE 8-5

S WATER MA

CTION COEF
e Appl
C-va
110
115
115
125
125
h pipeline w
o have a C v
c Model
rs discussed
n and capaci
ailed results
Table 8-6.
luation of E
mtb020401\docume
ange of expe
Because fire
sumed that a
ve typical ra
nes are prese

ASTER PLAN

FFICIENTS
lied
alue
0 5
5 5
5 within Pressur
value of 130,
d in Section 8
ity of the dis
are included
Wa
Existing Dist
ents\_water master
ected friction
e hydrant flo
all pipes with
anges for pip
ented in Tab
N
re Zone B, i
, typical of n

8.4 and 8.5,
stribution sy
d in Append
City of An
ater Master P
tribution Sys
MTB0
r plan\final\0713 m
n coefficient
ow data from
hin the
peline age an
ble 8-5.
dentified as
newly
the hydrauli
stem for exi
ix J. Execut
ngels
Plan
stem
020401
mp.docx
s
m
nd
ic
sting
ted
City of Angels
Water Master Plan
Chapter 8: Hydraulic Evaluation of Existing Distribution System Angels WMP 8-11 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 8-6

CITY OF ANGELS WATER MASTER PLAN

EXECUTED HYDRAULIC MODEL SCENARIOS
Demand Scenario Scenario Description
Existing Conditions
Existing ADD ADD for existing parcels; based on demand factors presented in Table 8-2
Existing MDD Existing ADD scenario with an applied MDD
peaking factor of 2.2 (per Section 5.4)
Existing PHD Existing MDD scenario with an applied PHD
peaking factor of 1.7 (per Section 5.4)
Existing MDD
Plus Fire Flowa
Existing MDD scenario with fire flow demands
applied and analyzed independently at each hydrant
location
Buildout Conditionsb

Buildout ADD ADD for buildout parcels; based on demand factors presented in Table 8-2
Buildout MDD Buildout ADD scenario with an applied MDD
peaking factor of 2.2 (per Section 5.4)
Buildout PHD Buildout MDD scenario with an applied PHD
peaking factor of 1.7 (per Section 5.4)
Buildout MDD
Plus Fire Flowa
Buildout MDD scenario with fire flow demands
applied and analyzed independently at each hydrant
a
Fire flow requirements presented in Table 8-7.
b
Buildout Conditions based on ultimate General Plan [1] land uses.

The results of scenarios presented in Table 8-6 were analyzed to evaluate the distribution system for areas with excessively low or high pressures and the effectiveness of future infrastructure improvements. Fire flow requirements, previously presented in Table 4-1, are also presented in Table 8-7 for reference.

Angels WM
July 2013

8.7 D
The distr
Addition
identified
Desired h
Table 4-2
Min
Min
Min
Min
plu
Ma
con
Ma
Ma
MP
Rural resid
Single fam
Single fam
Multiple re
businesses
Multiple re
story; light
Multiple re
or heavy in
a
Fire flows
Distribution
ribution syste
nally, a fire fl
d in Table 8-
hydraulic pe
2, are presen
DISTR
Criter
nimum pressur
nimum pressur
nimum pressur
nimum pressur
us MDD
aximum pressu
nnection
aximum velocit
aximum head lo
Cha
CITY
Land Us
dential (<2 lots
mily residential
mily residential
esidential up to
s of one story
esidential units
t commercial a
esidential, thre
ndustrial
and durations e
System Per
em was anal
flow analysis
-7.
rformance c
nted in Table
CITY

RIBUTION SY
ria
re – ADD
re – MDD
re – PHD
re – fire flow
ure at service
ty
oss gradient
apter 8: Hyd
TA

OF ANGELS

FIRE FLOW
se Category
s/acre)
(<2 lots/acre)
(≥3 lots/acre)
o a fourplex; ne
s of >4 units, o
and light indust
ee stories, heav
stablished in Cit
rformance u
lyzed under
s was perform
criteria for th
e 8-8 for refe
TA

OF ANGELS

YSTEM HYD
Val
40 psi
35 psi
20 psi
20 psi
150 psi (PRV
at 80 psi)
8 fps (typica
12 fps (short
10 ft per 1,0
draulic Eval
8-12
n:\m
ABLE 8-7

S WATER MA

W REQUIREM
eighborhood
one and two
trial
y commercial,
ty Resolution 21
under Existi
existing con
med using M
he distributio
erence.

ABLE 8-8

S WATER MA

DRAULIC PER
lue
V required
al)
t durations)
00 ft
luation of E
mtb020401\docume

ASTER PLAN
MENTS
Fire Flow
(gpm)
500
500
750
750
1,500
2,000
1-78.
ing Conditi
nditions for A
MDD and Cit
on system, pr

ASTER PLAN

RFORMANC
2010 Improve
Typical design
California Wa
2010 Improve
California Wa
2010 Improve
Typical design
Typical design
Wa
Existing Dist
ents\_water master
N
wa Durati
(hour
2 2
2 2
2 2
ions

ADD, MDD
ty fire flow r
reviously pr
N

CE CRITERIA
Source
ement Standard
n standard
aterworks Stan
ement Standard
aterworks Stan
ement Standard
n standards
n standard
City of An
ater Master P
tribution Sys
MTB0
r plan\final\0713 m
ion
rs)
, and PHD.
requirement
resented in
A
ds [16]
dards [10]
ds [16],
dards [10]
ds [16]
ngels
Plan
stem
020401
mp.docx
ts,
Angels WM
July 2013
a. A
Several p
criteria fo
Hydrauli
in Figure
were ach
HYDR
Scenario
ADD
MDD
PHD

a
Length-weig
MP
Average Day
pipe segment
or maximum
ically deficie
e 8-4. Hydrau
hieved in all

RAULICALLY
Lo
Greenhorn C
Moose Trail
Golden Chai
Mark Twain
Moose Trail
Golden Chai
Hillcrest Stre
Mark Twain
Moose Trail
Murphy's Gr
Oneida Stree
Stanislaus A
ghted average.

Cha
, Maximum
ts and one ju
m pressure an
ent junctions
ulic perform
demand scen
CITY

Y DEFICIENT
cation
Creek Road
in Highway
Road
in Highway
eet
Road
rade Road
et
venue
apter 8: Hyd
Day, and Pe
unction were
nd maximum
s and pipe se
mance criteria
narios for ex
TA

OF ANGELS

T JUNCTION
Maximu
No. of
Junctions
1 -
-
-
-
-
-
-
-
-
-
-
draulic Eval
8-13
n:\m
eak Hour De
e identified a
m head loss g
egments are s
a for minimu
xisting condi
ABLE 8-9

S WATER MA

NS AND PIPE
um Pressures
s
Pressure
Range
(psi)
151
-
-
-
-
-
-
-
-
-
-
-
luation of E
mtb020401\docume
emands (Exi
as failing to
gradient und
summarized
um pressure
itions.

ASTER PLAN

SEGMENTS
Ma
Pipe
Lengt
(ft)
-
958
47 825
958
802
175
1,740
958
3,329
548
542
Wa
Existing Dist
ents\_water master
sting)
meet hydrau
der existing c
d in Table 8-9
and maximu
N

S, EXISTING
aximum Head
e
th
Pipe
Diameter
(in)
-
4 6
6 4
6 - 8
6 0 6
4 9 6 - 8
4 4
City of An
ater Master P
tribution Sys
MTB0
r plan\final\0713 m
ulic performa
conditions.
9 and presen
um velocity

CONDITION
d Loss Gradie
r
Head L
Gradie
(ft per 1,0
-
13 35
13 31
25 22
25 32
12 13
13 ngels
Plan
stem
020401
mp.docx
ance
nted
NS
nt
Loss
ent
00 ft)a
MOOSE TRAIL All Scenarios GOLDEN CHAIN HIGHWAY MDD and PHD Scenarios MURPHY'S GRADE ROAD PHD Scenario GOLDEN CHAIN HIGHWAY PHD Scenario GREENHORN CREEK RD ADD and MDD Scenarios STANISLAUS AVENUE PHD Scenario ONEIDA STREET PHD Scenario ZONE E ZONE D ZONE B ZONE C MARK TWAIN ROAD MDD and PHD Scenarios HILLCREST STREET PHD Scenario MARK TWAIN ROAD PHD Scenario ZONE A DEMAND SCENARIOS (EXISTING CONDITIONS): 1. ADD: AVERAGE DAY DEMAND SCENARIO 2. MDD: MAXIMUM DAY DEMAND SCENARIO 3. PHD: PEAK HOURLY DEMAND SCENARIO LEGEND PRESSURE ZONE BOUNDARY WATER DISTRIBUTION SYSTEM NETWORK PIPELINE DEFICIENCIES MAXIMUM HEADLOSS EXCEEDED (ADD, MDD, AND PHD SCENARIOS) MAXIMUM HEADLOSS EXCEEDED (PHD SCENARIO ONLY) PIPELINE DEFICIENCIES MAXIMUM PRESSURE EXCEEDED (ADD, MDD, AND PHD SCENARIOS) Angels WM
July 2013
b. F
The distr
mains 4-i
identified
hydraulic
contains
reviewed
Several f
MDD co
presented
Model
Hydrant
ID
D3-FH-10
D3-FH-10
D3-FH-10
A1-FH-10
A1-FH-10
A1-FH-10
A1-FH-10
A1-FH-11
B2-FH-11
B2-FH-12
B2-FH-13
B2-FH-13
D2-FH-11
D2-FH-11
D2-FH-11
a Available fi
b Residual pr
c N/A indicat
d Wharf-type
MP
ire Flow An
ribution syste
inches in dia
d approxima
c model is ge
262 fire hyd
d to determin
fire hydrants
nditions. Hy
d in Figure 8

HYDRAUL
t
City
Hydran
ID
05 53
06 54d
07 52
01 A59
02 A69
03 A68
04 A67
14 A962
9 A332
21 A311
30 A20
31 A36
16 391
12 806
13 807
fire flow with 20
ressure with achi
tes that required
e hydrant.

Cha
nalysis (Exist
em contains
ameter or sm
ately 30 whar
enerally com
drants, 28 of
ne fire flow r
were identi
ydraulically d
8-5.

CITY

LICALLY DE
nt
Loc
Mark Tw
Fairview
Mark Tw
Copello R
Golden C
Golden C
Golden C
Brunner H
Monte Ve
Monte Ve
Lee Lane
Golden C
Gold Clif
Jumping F
Miner's C
psi residual pre
ievement of requ
fire flow was no
apter 8: Hyd
ting)
approximat
maller are “w
rf hydrants o
mprised of pi
f which are w
requirements
fied as failin
deficient fire
TA

OF ANGELS

EFICIENT FI
cation
wain Road
Street
wain Road
Road
Chain Hwy
Chain Hwy
Chain Hwy
Hill Road
erde Street
erde Street
Chain Hwy
ff Road
Frog Way
Circle
ssure.
uired fire flow.
ot achieved with
draulic Eval
8-15
n:\m
ely 300 fire
wharf” style h
on mains 6-i
ipe segments
wharf-type hy
s for each hy
ng to produc
e hydrants ar
ABLE 8-10

S WATER MA

IRE HYDRAN
Assumed Lan
Use Categor
Single family
residential
(<2 lots/acre
Multiple
residential uni
of >4 units, on
and two story
light commerc
and light
industrial
Multiple
residential, thr
stories, heavy
commercial, o
heavy industri
h any residual pre
luation of E
mtb020401\docume
hydrants. A
hydrants. Ad
inches in dia
s 6-inches in
ydrants. GIS
ydrant based
e the require
re summariz

ASTER PLAN

NTS, EXISTIN
nd
ry
Fire
Requir
y
e)
500
500
500
its
ne
y;
cial
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
ree
vy
or
ial
2,000
2,000
essure.

Wa
Existing Dist
ents\_water master
All hydrants c
dditionally, C
ameter or lar
n diameter or
S data for the
d on adjacent
ed fire flow u
zed in Table
N

NG CONDITI
e Flow (gpm)
red Availab
436
422
454
0 1,452
0 1,416
0 1,459
0 1,495
0 1,010
0 1,488
0 1,194
0 1,364
0 855
0 934
0 1,989
0 1,966
City of An
ater Master P
tribution Sys
MTB0
r plan\final\0713 m
connected to
City staff ha
ger. The
r larger and
e City were
t land uses.
under existin
8-10 and
IONS
Resid
Press
ble (psi) a
8 1
13 2 14
6 11
9 15
5 19
0 (N/A
8 18
4 (N/A
4 3
(N/A
(N/A
9 16
6 1
ngels
Plan
stem
020401
mp.docx
o
ave
ng
dual
ure
)
b,c
3 4
5 9
A)
8 A)
A)
A)
6 ZONE E ZONE D ZONE B ZONE C MARK TWAIN ROAD D3-FH-105 D3-FH-107FAIRVIEW STREET D3-FH-106 GOLD CLIFF ROAD D2-FH-116 MONTE VERDE STREET B2-FH-119 MONTE VERDE STREET B2-FH-121 GOLDEN CHAIN HIGHWAY B2-FH-131 BRUNNER HILL ROAD A1-FH-114 COPELLO ROAD A1-FH-101 GOLDEN CHAIN HIGHWAY A1-FH-102 A1-FH-103 A1-FH-104 LEE LANE B2-FH-130 ZONE A JUMPING FROG WAY D2-FH-112 MINER'S CIRCLE D2-FH-113 LEGEND PRESSURE ZONE BOUNDARY WATER DISTRIBUTION SYSTEM NETWORK FIRE HYDRANT DEFICIENCIES FAILURE TO MEET REQUIRED FLOW (500 GPM) FAILURE TO MEET REQUIRED FLOW (1,500 GPM) FAILURE TO MEET REQUIRED FLOW (2,000 GPM) NOTE: 1. FIRE FLOW ANALYSIS PERFORMED UNDER MAXIMUM DAY DEMAND (MDD) SCENARIO.

Angels WM
July 2013
9Re
Improvem
Chapters
Addition
presented

9.1 R
Currently
potable w
Chapter 6
hydrogeo
further in
Figure 9-
A prelim
pumping
provided
As shown
Alternati
installatio
The exist
Well Site
facilitate
Well
Alter
A
B
C
D
a Elevati
b Total D
c
Well S
MP
ecomm
ments for Ci
6, 7, and 8 a
nal projects p
d in Chapter
Recommend
y, the City re
water. The de
6 as a recom
ologic techni
nvestigation.
-1.
minary hydrau
g requiremen
d in Table 9-
HY
n by Table 9
ive D, requir
on of a press
ting PRV do
es B, C, and
s connection
l Site
native E
A
B
C
D
ion where the su
Dynamic Head (T
Site Alternative D
mended
ity water sup
are assemble
previously pl

10. ded Water S
elies exclusiv
evelopment
mmended stra
ical memora
. The potenti
ulic analysis
nts. A hydrau

1. CITY

YDRAULIC SU
9-1, all groun
re a booster p
sure-reducin
ownstream o
D have the a
n to a propos
Well
Elevation
1,598
1,893
1,740
2,127
upply pipeline co
TDH) required a
D does not requir
d Impr
pply, treatme
ed into a seri
lanned by th
upply Impr
vely on surfa
of groundwa
ategy to augm
andum (Appe
ial well sites
s was perform
ulic summary
T

Y OF ANGELS

UMMARY O
ndwater supp
pump station
ng station pri
f the WTP m
advantage o
sed storage t
Maximum Pip
Elevation al
Route
1,642
1,895
1,895
2,127
onnects to the dis
at booster pump
re a booster pum
9-1
n:\m
roveme
ent, distribut
ies of recom
he City are al
rovements
face water de
ater supplies
ment the Cit
endix G) ide
s and associa
med for each
y for each w
TABLE 9-1

S WATER MA

F SUPPLY R
ply alternativ
n to facilitate
ior to connec
may be suitab
f being locat
ank site in P
peline
long Con
Ele
1 1
1 1
stribution system
station to supply
mp station.
mtb020401\docume
ents
tion, and stor
mmended pro
lso described
elivered thro
s from region
ty’s water su
entified four
ated pipeline
h pipeline ro
well site and p

ASTER PLAN

ROUTE ALTE
ves, with the
e delivery. E
ction to the e
ble for use w
ted to the ea
Pressure Zon
nnection
evationa
1,570
1,415
1,415
1,415
m.
y water to distrib
ents\_water master
rage system
ojects in this
d. Probable c
ough UPA as
nal wells wa
upply. A sub
potential we
e routes are p
oute to determ
pipeline sup
N

ERNATIVES
e exception o
Each alternat
existing distr
with Well Sit
ast of the City
ne C (see Sec
Pipeline
Length
(ft)
8,300
30,600
33,100
27,100
bution system.

MTB0
r plan\final\0713 m
s described i
chapter.
costs are
s a source of
as identified
bsequent
ell sites for
provided in
mine booster
pply route is
of Well Site
tive also requ
ribution syst
te Alternativ
y which
ction 9.4).

TDH
Required
(ft)b
170
135
290
N/Ac
020401
mp.docx
in
f
in
r
e
uires
tem.
ve A.
d
ANGELS CAMP POTENTIAL WELL SITE C Near Well 32B POTENTIAL TANK SITE (Zone B) MURPHY'S GRADE ROAD SR4 VALLECITO MURPHYS DOUGLAS FLAT POTENTIAL WELL SITE D Near Well 17J VALLECITO BYPASS POTENTIAL TANK SITE (Zone A) POTENTIAL TANK SITE (Zone C) POTENTIAL WELL SITE A Near Well 23M CONNECT TO 8" PIPELINE AREA 2 AREA 3 CONNECT TO 14" PIPELINE AREA 1 POTENTIAL WELL SITE B Near Well 29P PARROT'S FERRY ROAD LEGEND POTENTIAL SUPPLY PIPELINE ROUTE APPROXIMATE TERTIARY GRAVEL CHANNEL COUNTY PARCEL TOWNSHIP BOUNDARY COUNTY ROAD LIMESTONE FORMATION AREA OF INTEREST FOR DWR WELL LOG REVIEW POTENTIAL WELL SITE POTENTIAL TANK SITE Angels WM
July 2013
An asses
advantag
Final wel
hydrogeo
For plann
B) is targ
drilling).
of surfac
Selection
Investiga
high-qua
hole drill
water sup

9.2 W
As discu
treatment
improvem
MP
sment of We
ges/disadvant
ASSE
Well Site
Alternative
A
B
C
D
ll site selecti
ologic assess
ning purpose
geted for the
Two wells a
e water deliv
n of Area 3 i
ation (Appen
ality groundw
ling confirm
pply system
Water Treat
ssed in Chap
t capacity, re
ment project
ell Site/Supp
tages, is pro
CITY

ESSMENT OF
- Shortest p
- Reduced i
- Allows co
- Operation
- Relatively
- Allows co
- Operation
- Does not r
- Reduced o
- Allows co
- Operation
ion will be d
sment.
es and becau
next phase o
are desired t
vered throug
s based on re
ndix G) whic
water requiri
m the initial fi
improvemen
tment Plant
pter 7, severa
edundancy, o
ts are summa
ply Pipeline
vided in Tab
T

Y OF ANGELS

F WELL SITE
Advantages
ipeline length
nstallation cos
onnection to Zo
al redundancy
y low TDH requ
onnection to Zo
al redundancy
require booster
operational cos
onnection to Zo
al redundancy
dependent up
use of superi
of groundwa
to meet futur
gh UPA.
ecommenda
ch indicate A
ing the fewes
indings, Wel
nts.

Recommen
al improvem
operational d
arized in Tab
C
9-3
n:\m
Alternatives
ble 9-2.

TABLE 9-2

S WATER MA

E/SUPPLY PI
sts
one C Tank
uirement
one C Tank
r pumping
sts
one C Tank
pon the resul
or hydrogeo
ater developm
re water dem
ations presen
Area 3 is the
st number of
ll Site and W
nded Impro
ments are rec
difficulties,
ble 9-3.

Chapter 9: R
mtb020401\docume
s, considerin

ASTER PLAN

IPELINE ALT
Dis
- Requires boo
- No connectio
- Lacks operat
- Requires boo
- Increased op
- Relatively lo
- Increased ins
- Requires boo
- Increased op
- Relatively lo
- Increased ins
- Relatively lo
- Increased ins
lts of test we
ological char
ment (geoph
mands in con
nted in the In
likeliest to y
f wells. If ge
Waterline Ro
vements
commended
and regulato
Wa
Recommende
ents\_water master
ng hydraulic
N

TERNATIVE
sadvantages
oster pumping
on to Zone C T
tional redundan
oster pumping
perational costs
ong pipeline len
stallation costs
oster pumping
perational costs
ong pipeline len
stallation costs
ong pipeline len
stallation costs
ell drilling an
racteristics, A
hysical profi
njunction wit
nitial Hydrog
yield a suffic
eophysical p
oute B will b
at the WTP
ory concerns
City of A
Water Master
ed Improvem
MTB0
r plan\final\0713 m
and operatio
S
Tank
ncy
s
ngth
s
s
ngth
s
ngth
s
nd
Area 3 (Well
iling, test hol
th continued
geologic
cient quantit
profiling and
be the preferr
to address
s. These
ngels
Plan
ments
020401
mp.docx
onal
l Site
le
d use
ty of
test
red
Angels WM
July 2013
Pro
Second Flo
Basin
Second
Sedimentat
Replace Ex
Sedimentat
Sludge Lag
Recycle Pu
Station
Fourth Filt
Parallel Tra
Main
The reco
through 2
improvem
buildout
success o

9.3 D
The distr
identify s
criteria fo
for refere
MP
RECO
oject
occulation C
(
d
a
tion Basin
C
s
xisting
tion Basin
C
s
goons and
ump
C
l
s
er C
a
g
ansmission I
m
(
w
t
mmended W
2031 (20-yea
ments at the
improvemen
of the ground
Distribution
ribution syste
specific pipe
or the distrib
ence.

CITY

OMMENDED
Construction o
(approximately
depth to match
and associated
Construction o
sludge removal
Construction o
sludge removal
Construction o
lagoons, associ
station
Construction o
associated pipi
generation
Installation of a
main (3,508 ft)
(parallel to exis
water demands
transmission pi
WTP improve
ar projection
WTP would
nts could be
dwater explo
System Rec
em was eval
eline segmen
bution system
T

Y OF ANGELS

D WATER TR
Descri
f a four-stage f
y 48 ft long, 12
h existing) with
piping
f a sedimentati
l system and as
f a sedimentati
l system and as
f two lined 500
iated piping, an
f a 720 gpm fo
ng, and additio
an upsized 18-
) from WTP to
sting transmiss
s in conjunction
ipelines and sto
ements in Ta
n). Beyond 2
d be required
deferred, do
oration and d
commended
luated for ex
nts which req
m, previousl
C
9-4
n:\m
TABLE 9-3

S WATER MA

REATMENT P
ption
flocculation ba
2 ft long, and 9
h a rotating pad
ion basin with
ssociated pipin
ion basin with
ssociated pipin
0,000 gallon sl
nd duplex recy
our-cell pressur
onal sodium hy
-inch diameter
distribution sy
sion main) to m
n with supplem
orage facilities
able 9-3 wou
2031, to mee
d, most notab
ownsized, or
development
d Improvem
xisting and fu
quire upsizin
y presented
Chapter 9: R
mtb020401\docume

ASTER PLAN

PLANT IMPR
asin
ft water
ddle assembly
an automatic
ng
an automatic
ng
ludge
ycled pump
re filter,
ypochlorite
transmission
ystem
meet future
mental
s
uld accomm
et buildout de
bly a fifth pr
r eliminated
t program.
ments
uture (buildo
ng. Desired h
in Table 4-2
Wa
Recommende
ents\_water master
N
ROVEMENT Capacity Redundancy O ti l
X
X

X
X
odate future
emands, add
ressure filter
altogether d
out) demand
hydraulic pe
2, are presen
City of A
Water Master
ed Improvem
MTB0
r plan\final\0713 m
S
Benefits
Operational
Difficulties Aging Infrastructure

X X
X

X
e demands
ditional
r. However,
depending on
d conditions t
erformance
nted in Table
ngels
Plan
ments
020401
mp.docx Regulatory Concerns
X
X
X
these
n the
to
e 9-4
City of Angels
Water Master Plan
Chapter 9: Recommended Improvements
Angels WMP 9-5 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 9-4

CITY OF ANGELS WATER MASTER PLAN

DISTRIBUTION SYSTEM HYDRAULIC PERFORMANCE CRITERIA
Criteria Value Source
Minimum pressure – ADD 40 psi 2010 Improvement Standards [16] Minimum pressure – MDD 35 psi Typical design standard
Minimum pressure – PHD 20 psi California Waterworks Standards [10] Minimum pressure – fire flow
plus MDD
20 psi 2010 Improvement Standards [16],
California Waterworks Standards [10]
Maximum pressure at service
connection
150 psi (PRV required
at 80 psi)
2010 Improvement Standards [16]
Maximum velocity 8 fps (typical)
12 fps (short durations)
Typical design standards
Maximum head loss gradient 10 ft per 1,000 ft Typical design standard Generally, the existing distribution network has sufficient capacity for buildout ADD and MDD demand conditions. However, under buildout PHD demand conditions, there are a number of areas that fail to meet the minimum pressure specified in Table 9-4 and the fire flow requirements identified previously in Table 8-7. Based on the hydraulic analyses, approximately 27,400 LF of existing distribution mains were identified for upsizing to facilitate buildout demands. Recommended distribution main improvements are summarized in Table 9-5 and presented in Figure 9-2.

The remaining segments of the SR-49 Pipeline Replacement (from Stanislaus Street to Altaville Post Office), identified in Section 2.2, are included in the Golden Chain Highway 8-inch to 10-inch improvement (upsize) project.

Phasing of distribution system improvements are suggested considering the following priorities:
a. Provide required fire flow for existing demands (Phase 1A) b. Meet hydraulic performance criteria for existing demands (Phase 1B) c. Provide required fire flow for future demands (Phase 2A) d. Meet hydraulic performance criteria for future demands (Phase 2B)

City of Angels
Water Master Plan
Chapter 9: Recommended Improvements
Angels WMP 9-6 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 9-5

CITY OF ANGELS WATER MASTER PLAN

RECOMMENDED DISTRIBUTION MAIN IMPROVEMENTS
Location Project Description Length (ft)
Phase 1A - Meet Fire Flow Requirements (Existing Demand) Gold Cliff Road Upsize 8-inch to 10-inch 1,144
Golden Chain Highway New 6-inch main 49
Upsize 6-inch to 10-inch 47
Upsize 8-inch to 10-inch 3,316
Hillcrest Street Upsize 6-inch to 10-inch 175
Upsize 8-inch to 10-inch 108
Mark Twain Road Upsize 6-inch to 10-inch 1,740
McCauley Ranch Road Upsize 8-inch to 10-inch 294
Monte Verde Street Upsize 4-inch to 6-inch 281
Phase 1B - Meet Hydraulic Performance Criteria (Existing Demand) Depot Road Upsize 6-inch to 10-inch 225
Moose Trail Upsize 4-inch to 10-inch 958
Murphy's Grade Road Upsize 10-inch to 16-inch 995
Upsize 6-inch to 16-inch 1,289
Upsize 8-inch to 16-inch 2,673
Valecito Road Upsize 4-inch to 6-inch 476
Phase 2A - Meet Fire Flow Requirements (Buildout Demand) Replace Principal
Transmission Main Upsize 14-inch to 18-inch 3,508
Golden Chain Highway Upsize 4-inch to 6-inch 857
Mark Twain Road Upsize 4-inch to 6-inch 681
Phase 2B - Meet Hydraulic Performance Criteria (Buildout Demand) 12-inch Transmission Main Upsize 12-inch to 16-inch 2,718 Bret Harte Drive Upsize 4-inch to 6-inch 186
Depot Road Upsize 6-inch to 8-inch 797
Dogtown Road Upsize 4-inch to 6-inch 1,278
Fairview Drive Upsize 4-inch to 6-inch 237
Gardner Lane Upsize 6-inch to 8-inch 529
Kurt Drive Upsize 8-inch to 10-inch 355
Mark Twain Road Upsize 4-inch to 6-inch 583
McCauley Ranch Upsize 8-inch to 10-inch 914
S. Baker Road Upsize 4-inch to 6-inch 353
Suzanne Drive Upsize 6-inch to 8-inch 648
Total 27,414
ZONE E ZONE D ZONE B ZONE C GOLDEN CHAIN HIGHWAY 1A: New Construction (See Detail) DOGTOWN ROAD 2B: Main Upsize MONTE VERDE STREET 1A: Main Upsize GARDNER LANE 2B: Main Upsize MURPHY'S GRADE ROAD 1B: Main Upsize (E) 12-INCH TRANSMISSION MAIN 2B: Main Upsize PRINCIPAL TRANSMISSION MAIN UPSIZE (E) 14-INCH MAIN TO 18-INCH 2A: Main Upsize GOLDEN CHAIN HIGHWAY 1A: Main Upsize GOLDEN CHAIN HIGHWAY 1A: Main Upsize MARK TWAIN ROAD 1A: Main Upsize GOLD CLIFF ROAD 1A: Main Upsize McCAULEY RANCH ROAD 1A: Main Upsize MARK TWAIN ROAD 2A: Main Upsize FAIRVIEW DRIVE 2B: Main Upsize GOLDEN CHAIN HIGHWAY 2A: Main Upsize S. BAKER ROAD 2B: Main Upsize SUZANNE DRIVE 2B: Main Upsize BRET HARTE DRIVE 2B: Main Upsize KURT DRIVE 2B: Main Upsize MOOSE TRAIL 1B: Main Upsize DEPOT ROAD 2B: Main Upsize VALECITO ROAD 1B: Main Upsize HILLCREST STREET 1A: Main Upsize ZONE A A1-FH-114 Required Flow: 1,500 gpm Available Flow: 1,170 gpm MARK TWAIN ROAD 2B: Main Upsize McCAULEY RANCH ROAD 2B: Main Upsize DEPOT ROAD 1B: Main Upsize C2-111: 151 psi Buildout, ADD Scenario E3-100: 152 psi
Buildout, ADD Scenario
E3-112: 152 psi
Buildout, ADD Scenario LEGEND 6-INCH DIAMETER IMPROVEMENT 8-INCH DIAMETER IMPROVEMENT 10-INCH DIAMETER IMPROVEMENT 16-INCH DIAMETER IMPROVEMENT 18-INCH DIAMETER IMPROVEMENT NEW CONSTRUCTION PRESSURE ZONE BOUNDARY PHASING 1A MEET FIRE FLOW REQUIREMENTS (EXISTING DEMAND) 1B MEET HYDRAULIC PERFORMANCE CRITERIA (EXISTING DEMAND) 2A MEET FIRE FLOW REQUIREMENTS (BUILDOUT DEMAND) 2B MEET HYDRAULIC PERFORMANCE CRITERIA (BUILDOUT DEMAND) GOLDEN CHAIN HIGHWAY - New Construction Detail - Not to Scale Angels WM
July 2013
Impleme
and fire f
located n
MDD co
surround
distributi
Addition
maximum
maximum
within th
in these j
One new
Street wh
flow at h

9.4 R
Currently
the WTP
the City w
discussed
(Zone A)
Zone B o
City staff
site altern
P
MP
ntation of th
flow deficien
near Brunner
nditions is a
ding land use
ion line is in
nally, under b
m pressures r
m pressure. T
he allowable
unctions we
w main is reco
hich will clo
hydrant B2-F
Recommend
y, storage fo
P. As discuss
water system
d in Section
) is 2.3 MG (
or Zone C is
f have identi
natives are s
Pressure
Zone
A
B
C
he improvem
ncies for bui
r Hill Road.
approximatel
es. Due to the
sufficient to
buildout AD
ranging from
These juncti
error for the
ere not consi
ommended f
se an existin
FH-131 to th
ded Water S
r the distribu
ed in Chapte
m. To avoid

7.2, the min
(see Section

1.4 MG.
ified three po
summarized
CITY
STO
Tank Loca
WTP;
North of C
Brunner Hill
Northwest o
Southeast of
East of C
ments identifi
ildout deman
The fire flow
ly 1,100 gpm
e relatively h
o correct the
D condition
m 151-152 p
ons are iden
e hydraulic m
dered.
for installatio
ng 6-inch dia
e desired 1,5
torage Imp
ution system
er 4 and Cha
service inter
nimum volum
n 7.2). The m
otential sites
in Table 9-6
T

Y OF ANGELS

ORAGE TANK
ation E
;
City
l Road;
of City
f SR-4;
City
C
9-8
n:\m
ied in Table
nds with the
w available a
m, or 75 perc
high elevatio
fire flow def
ns, three junc
si, approxim
ntified in Fig
model and fu
on on Golde
ameter pipeli
500 gpm.
rovements
m is provided
apter 7, CDP
rruptions, a n
me of a stora
minimum vol
s for constru
6 and present
TABLE 9-6

S WATER MA

K SITE ALTE
Ground
Elevation
1,810
1,840
1,800
Chapter 9: R
mtb020401\docume
9-5 will alle
exception o
at Hydrant A
cent of the 1
on of this hy
ficiency.
ctions (C2-1
mately 1% gr
gure 9-2. The
urther improv
en Chain Hig
ine loop and
d by a single
PH has comm
new storage
age tank con
lume of a sto
uction of a ne
ted in Figure

ASTER PLAN

ERNATIVES
Required
Volume (M

2.3 1.4

1.4 Wa
Recommende
ents\_water master
eviate distrib
of Hydrant A
A1-FH-114 u
,500 gpm di
ydrant, upsiz
1, E3-100, a
reater than th
e 1% pressur
vements to r
ghway near 2
d increase the

2.5 MG tan
mented on th
tank is reco
structed at o
orage tank co
ew storage ta
e 9-3.

N
d
MG)
Adjace
Diam
City of A
Water Master
ed Improvem
MTB0
r plan\final\0713 m
bution system
A1-FH-114,
under buildo
ctated by
zing the adjac
and E3-112)
he design cri
re differentia
reduce press
23 North Ma
e available f
nk located ne
he reliability
mmended. A
or near the W
onstructed in
ank. Storage
ent Pipeline
meter (in)
14 6
8 ngels
Plan
ments
020401
mp.docx
m
out
cent
have
iteria
al is
sure
ain
fire
ear
y of
As
WTP
n
e tank
ZONE E ZONE D ZONE B ZONE A ZONE C POTENTIAL TANK SITE (Zone B) POTENTIAL TANK SITE (Zone A) POTENTIAL TANK SITE (Zone C) SUPPLY LINE BOOSTER PUMP STATION DISCHARGE LINE SUPPLY LINE DISCHARGE LINE POTENTIAL SUPPLY PIPELINE Routes B, C, and D POTENTIAL SUPPLY PIPELINE Route A LEGEND POTENTIAL SUPPLY PIPELINE ROUTE STORAGE TANK SUPPLY AND DISCHARGE PIPELINE EXISTING DISTRIBUTION SYSTEM PRESSURE ZONE BOUNDARY POTENTIAL TANK SITE BOOSTER PUMP STATION Angels WM
July 2013
An asses
advantag
T
A
The Zone
However
with a su
transmiss
the new t
Based on
However
increasin
alleviate
The Zone
supply ro
simplify

9.5 M
As discu
detection
(AMR) s
gap on lo
reduces h
conserva
MP
sment of Sto
ges and disad
A
Tank Site
Alternative
(Zone)
A -
-
B -
-
C -
-
e A tank wou
r, this site is
ubsequent co
sion main w
tank would f
n site elevatio
r, there is no
ng long-term
the fire flow
e C tank site
oute for Wel
operational
Meter System
ssed in Secti
n survey, rep
system. The
ost water due
hours spent r
ation efforts.
orage Tank S
dvantages, is
CITY

ASSESSMEN
A
Located near W
Hydraulically
Highest elevat
Lesser require
Located near p
Lesser require
uld provide
not recomm
onnection to
ould then rep
fail to impro
on, the Zone
nearby supp
operational
w deficiency
e is recomme
l Site Altern
requirement
m Upgrade
ion 2.6, past
placing old w
leak detectio
e to aging pi
reading mete
Site Alternat
s provided in
T

Y OF ANGELS

NT OF STORA
Advantages
WTP and exist
ideal location
tion of all sites
ed volume (1.4
proposed supp
ed volume (1.4
the same hy
mended as it p
a common 1
present a sin
ve the system
e B tank site
ply source an
costs. Cons
at Hydrant A
ended as it is
natives B, C,
ts while prov
and Leak D
t recommend
water meters,
on survey an
pes and met
ers and incre
C
9-10
n:\m
tives, consid
n Table 9-7.

TABLE 9-7

S WATER MA

AGE TANK S
ting tank -
-
-
s
MG)
-
-
ly routes
MG)
-
ydraulic servi
places the ne
14-inch trans
ngle point of
m reliability
is a potentia
nd a pump s
truction of th
A1-FH-114.
s located in p
and D. This
viding a suita
Detection Su
dations for th
, and upgrad
nd replaceme
ters. An upgr
eases custom
Chapter 9: R
mtb020401\docume
dering hydrau
A discussion

ASTER PLAN

SITE ALTERN
Di
Greatest requi
14-inch transm
represents sin
Lacks redunda
Requires boos
Increased ope
Lowest elevat
ice as the ex
ew tank in p
smission ma
f failure for b
y of the City.
ally ideal loc
station would
he Zone B ta
.
proximity to
s would facil
able parallel
urvey
he City inclu
ding to an au
ent of water
rade to an A
mer awarenes
Wa
Recommende
ents\_water master
ulic and ope
n follows be
N

NATIVES
isadvantages
ired volume (2
mission main
ngle point of fa
ancy of other o
ster pumping to
erational costs
tion of all sites
xisting storag
proximity to
ain. The exist
both storage
.
cation for a n
d be required
ank would, h
o the propose
litate filling
l storage sou
ude conducti
utomatic met
meters woul
AMR system
ss in water u
City of A
Water Master
ed Improvem
MTB0
r plan\final\0713 m
erational
elow.

2.3 MG)
ailure
options
o fill
s
ge tank.
the existing
ting 14-inch
tanks. As su
new storage
d to fill the t
however,
ed pipeline
the tank and
urce.
ing a leak
ter reading
ld help close
significantly
usage and
ngels
Plan
ments
020401
mp.docx
tank
h
uch,
tank.
tank,
d
e the
y
Angels WM
July 2013

9.6 A
In additio
distributi
assessing

1. W

2. W
Water ma
water sys
objective
plans hav
or in conj
managem
the plans
equipmen
typically
MP
Additional R
on to the imp
ion, and stor
g water facili
Water Master
Water Rate an
aster plans a
stem facilitie
es, regulatory
ve provided
njunction wit
ment plans of
s include crea
nt. Ideally, th
occurs ever
Recommend
provement p
rage systems
ities. These i
r Plan (or As
nd Connecti
and rate and
es and to ens
y requiremen
similar guid
th a master p
ffer the adva
ation of an a
hese docume
ry 5-10 years
ded Projects
projects reco
, there are se
include:
sset Manage
on Fee Stud
connection f
sure that ade
nts, and main
dance as a ma
plan docume
antage of bet
asset invento
ents are prep
s.

C
9-11
n:\m
s
mmended to
everal useful
ment Plan)
dy
fee studies a
equate fundin
ntenance ne
aster plan do
nt. Although
tter estimatin
ory and proje
pared follow
Chapter 9: R
mtb020401\docume
o address wa
l activities re
are updated p
ng is availab
eds. In recen
ocument and
h a significan
ng costs for
ections for re
wing each Ge
Wa
Recommende
ents\_water master
ater supply, t
elated to per
periodically
ble to meet G
nt years, asse
d may be pre
nt undertaki
maintaining
emaining use
eneral Plan u
City of A
Water Master
ed Improvem
MTB0
r plan\final\0713 m
treatment,
riodically
to re-assess
General Plan
et managem
epared in lieu
ng, asset
g systems bec
eful life of
update which
ngels
Plan
ments
020401
mp.docx
the
n
ment
u of
cause
h
Angels WM
July 2013
10 P
Probable
Chapter 9
managem

10.1 C
The opin
from prev
planning
by the As
Engineer
(February

10.2 P
Project c
contingen
are based
20 percen
construct
Project c
transmiss
these pro

MP
Probab
project cost

9. The basis
ment, and adm
Construction
nions of cons
vious projec
purposes an
ssociated for
ring News R
y 2013).

Project Cost
osts for wate
ncies for eng
d on a review
nt contingen
tion manage
osts for wate
sion piping,
oject element
Munici
12-inch
Air Rel
Booste
Booste
Booste
Pressur
a
EA = e
b
Includ
ble Pro
ts were deve
for the costs
ministration
n Cost Accu
struction cos
cts and simila
nd have an ex
r the Advanc
Record (ENR
s for Water
er supply im
gineering, co
w of recent b
ncy. To obtai
ment, and ad
er supply im
ARVs, boos
ts are provid
CITY

UNIT COST
ipal Well, Drill
h Transmission
lease Valves
r Pump Station
r Pump Station
r Pump Station
re Reducing St
each, LS = lump
des cost for pavem
oject C
eloped for th
s, including
n, is describe
uracy
sts presented
ar project bi
xpected accu
cement of Co
R) San Franci
r Supply Im
mprovements
onstruction m
bid results, in
in total proje
dministration
mprovements
ster pump sta
ded in Table
TA

Y OF ANGELS

TS FOR WAT
Item
ling/Equipping
n Main Piping (
n, 135 ft TDH
n, 170 ft TDH
n, 290 ft TDH
tation
p sum.
ment removal an
10-1
n:\m
Costs
e recommen
allowances
d below.
d in this Mast
d results. Th
uracy within
ost Engineer
isco Constru
mprovements
are compos
management
ndexed to the
ect costs, a 2
n was added
include cos
ations, and p
10-1.

ABLE 10-1

S WATER MA

TER SUPPLY
g
(Rural Routes)
nd replacement.
mtb020401\docume
nded improv
for engineer
ter Plan are
he opinions w
n +50 to -30
ring (AACE
uction Cost I
s
sed of constr
t, and admin
e current EN
25 percent co
d.
st component
pressure-redu

ASTER PLAN

Y IMPROVEM
Unita
EA
)
b
LF
EA
LS
LS
LS
LS
ents\_water master
ements desc
ring, constru
based on do
were prepare
percent, bas
E). The costs
Index (SF-C
ruction costs
nistration. Co

NR SF-CCI,
ontingency f
ts for munic
ucing station
N
MENTS
Unit Cost (
400,000
100
2,000
525,000
660,000
1,125,000
40,000
MTB0
r plan\final\0713 m
cribed in
uction
ocumentation
ed for genera
sed on defini
are based on
CI) of 10369
s plus
onstruction c
and include
for engineeri
cipal wells,
ns. Unit cost
($)
0 0
0 0
0 0
020401
mp.docx
n
al
itions
n an
9 costs
a
ing,
ts for
Angels WM
July 2013
A prelim
pumping
costs for
facilities,
Component
Area 3, Well
Municipal W
12-inch Tran
(Rural Route)
Air Release V
Booster Pump
Pressure Red
Total Cost
a
Includes 20 p
b
Includes 25 p

10.3 P
WTP pro
construct
bid result
ENR SFcontingen
project co
Table 10
For budg
part of th
construct
pipeline e
14-inch t
as the pri
MP
minary hydrau
g and pressur
the drilling
, are provide
P
l Site B
Well, Drilling/Eq
smission Main
)
Valves
p Station, 135
ducing Station
percent contingen
percent contingen
Project Cost
oject costs ar
tion manage
ts, and EPA
-CCI, and in
ncy for engin
osts for each
-3.
geting purpos
he distributio
tion of the 1
eliminates th
transmission
incipal trans
ulic analysis
re reducing r
and equippin
ed in Table 1
CITY

PROJECT CO
Q
quipping
n 3
ft TDH
ncy for construc
ncy for engineer
s for Water
re composed
ment, and ad
guidelines (
nclude a 20 p
neering, con
h WTP impro
ses, the Para
on system im
.4 MG Zone
he need for a
n main will n
mission mai
s was perform
requirements
ng of two w
10-2.

TA

Y OF ANGELS

OSTS FOR W
Quantity Uni
2 EA
30,600 LF
17 EA
1 LS
1 LS

tion.
ring, construction
r Treatment
d of construc
dministration
(Modeling th
percent conti
nstruction ma
ovement pro
allel Transmi
mprovements
e C Storage T
a redundant t
not be remov
in from the W
10-2
n:\m
med for each
s and the pro
ells in Area
ABLE 10-2

S WATER MA

WATER SUPPL
it Unit Cos
($)
A 400,000
F 100
A 2,000
S 525,000
S 40,000

n management,
t Plant Impr
ction costs pl
n. Construct
he Cost of Inf
ingency. To
anagement, a
oject, identif
ission Main
s (see Table
Tank and W
transmission
ved from serv
WTP.

Chapte
mtb020401\docume
h supply alte
ojected quan
3, Site B, an

ASTER PLAN

LY IMPROV
st Base Co
($)
0 800,00
3,060,0
34,000
0 525,00
40,000
and administrati
rovements
lus contingen
tion costs are
nfrastructure
obtain total
and adminis
fied in Table
identified in
9-5, Phase 2
ell Site and
n main from
vice, the new
Wa
er 10: Proba
ents\_water master
ernative to de
ntity of ARV
nd associated
N

VEMENTS
ost Constr
Cost
00 960,
000 3,672
0 41,0
00 630,
0 48,0

ion.
ncies for eng
e based on a
e, [31]) index
project cost
stration was
e 9-3, are pro
n Table 9-3 i
2A). Recomm
Water Supp
the WTP. W
w 18-inch pi
City of A
Water Master
able Project C
MTB0
r plan\final\0713 m
etermine boo
Vs. Total proj
d conveyanc
ruction
t
a ($)
P
Co
,000 1,2
2,000 4,5
000 5
,000 79
000 6
6,6
gineering,
a review of re
xed to the cu
s, a 25 perce
added. Tota
ovided in
is included a
mended
ly Route B
While the exi
ipeline will s
ngels
Plan
Costs
020401
mp.docx
oster
ject
ce
Project
ostb ($)
200,000
590,000
52,000
90,000
60,000
692,000
ecent
urrent
ent
l
as
isting
serve
Angels WM
July 2013
Se
Se
Re
Slu
Fo
T
a
In
b
In
c C

10.4 P
Distribut
contingen
are based
20 percen
construct
Project c
(upsizing
pavemen
provided
MP
PROJEC
econd Floccula
econd Sedimen
eplace Existing
udge Lagoons
ourth Filter
c
Total Cost
ncludes 20 perce
ncludes 25 perce
Cost for fourth fi
Project Cost
tion system i
ncies for eng
d on a review
nt contingen
tion manage
osts for distr
g) of existing
nt removal an
d in Table 10
UN
CITY

CT COSTS F
Project
ation Basin
ntation Basin
g Sedimentatio
and Recycle P
ent contingency
ent contingency
ilter is based on e
s for Distrib
improvemen
gineering, co
w of recent b
ncy. To obtai
ment, and ad
ribution syst
g mains, inst
nd replaceme
0-4.

CITY

NIT COSTS F
TA

Y OF ANGELS

OR WATER
n Basin
Pump Station
for construction
for engineering,
estimate from 20
bution Syste
nt project cos
onstruction m
bid results, in
in total proje
dministration
tem improve
tallation of n
ent. Unit cos
TA

Y OF ANGELS

FOR DISTRIB
Diameter
(in)
6 8
10 12
16 18
a
Includes cos
and replacem
10-3
n:\m
ABLE 10-3

S WATER MA

TREATMEN
Base Co
500,0
990,0
990,0
520,0
885,0
n.
, construction m
011 Water Audit
em Improve
sts are comp
management
ndexed to the
ect costs, a 2
n was added
ements inclu
new mains to
sts for distrib
ABLE 10-4

S WATER MA

BUTION SYST
r Unit
($/un
6 10
13 15
23 25
t for pavement r
ment.

Chapte
mtb020401\docume

ASTER PLAN

NT PLANT IM
ost ($)
Co
C
000
000
000
000
000
management, and
t [6].
ements
posed of cons
t, and admin
e current EN
25 percent co
d.
ude cost com
o create loop
bution system

ASTER PLAN

TEM IMPRO
Cost
nit)a
7 00
34 50
36 58
removal
Wa
er 10: Proba
ents\_water master
N

MPROVEMEN
nstruction
Costa ($)
600,000
1,190,000
1,190,000
625,000
1,065,000
d administration.
struction cos
nistration. Co

NR SF-CCI,
ontingency f
mponents for
ps in the exis
m improvem
N

OVEMENTS
City of A
Water Master
able Project C
MTB0
r plan\final\0713 m
NTS
Project
Costb
($)
750,000
1,490,000
1,490,000
785,000
1,335,000
5,850,000
sts plus
onstruction c
and include
for engineeri
replacement
sting system,
ments are
ngels
Plan
Costs
020401
mp.docx
costs
a
ing,
t
, and
City of Angels
Water Master Plan
Chapter 10: Probable Project Costs
Angels WMP 10-4 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx Total project costs for each distribution system improvement project, identified in Table 9-5, are provided in Table 10-5.

TABLE 10-5

CITY OF ANGELS WATER MASTER PLAN

PROJECT COSTS FOR DISTRIBUTION SYSTEM IMPROVEMENTS
Location Project Description Length
(ft)
Unit
Cost
($/LF)
Base
Cost
($)
Construction
Costa
($)
Project
Costb
($)
Phase 1A - Meet Fire Flow Requirements (Existing Demand) Gold Cliff Road Upsize 8-inch to 10-inch 1,144 134 154,000 185,000 232,000 Golden Chain Highway New 6-inch main 49 67 4,000 5,000 7,000 Upsize 6-inch to 10-inch 47 134 7,000 9,000 12,000
Upsize 8-inch to 10-inch 3,316 134 445,000 534,000 668,000 Hillcrest Street Upsize 6-inch to 10-inch 175 134 24,000 29,000 37,000 Upsize 8-inch to 10-inch 108 134 15,000 18,000 23,000
Mark Twain Road Upsize 6-inch to 10-inch 1,740 134 234,000 281,000 352,000 McCauley Ranch Road Upsize 8-inch to 10-inch 294 134 40,000 48,000 60,000 Monte Verde Street Upsize 4-inch to 6-inch 281 67 19,000 23,000 29,000 Phase 1A, Subtotal 1,420,000
Phase 1B - Meet Hydraulic Performance Criteria (Existing Demand) Depot Road Upsize 6-inch to 10-inch 225 134 31,000 38,000 48,000 Moose Trail Upsize 4-inch to 10-inch 958 134 129,000 155,000 194,000 Murphy's Grade Road Upsize 10-inch to 16-inch 995 236 235,000 282,000 353,000 Upsize 6-inch to 16-inch 1,289 236 305,000 366,000 458,000 Upsize 8-inch to 16-inch 2,673 236 631,000 758,000 948,000 Valecito Road Upsize 4-inch to 6-inch 476 67 32,000 39,000 49,000 Phase 1B, Subtotal 2,050,000
Phase 2A - Meet Fire Flow Requirements (Buildout Demand) Replace Principal
Transmission Main Upsize 14-inch to 18-inch 3,508 258 906,000 1,088,000 1,360,000 Golden Chain Highway Upsize 4-inch to 6-inch 857 67 58,000 70,000 88,000 Mark Twain Road Upsize 4-inch to 6-inch 681 67 46,000 56,000 70,000 Phase 2A, Subtotal 1,518,000
Angels WM
July 2013
Loca
Phase 2B - M
12-inch Trans
Bret Harte Dri
Depot Road
Dogtown Roa
Fairview Driv
Gardner Lane
Kurt Drive
Mark Twain R
McCauley Ran
S. Baker Road
Suzanne Drive
Phase 2B, Sub
Total, Distrib
a
Includes 20 pe
b
Includes 25 pe

10.5 P
Storage i
engineeri
review of
contingen
managem
Project c
supply an
improvem
MP
PROJ
ation
Meet Hydraulic
mission Main
ive
ad
ve
Road
nch
d
e
btotal
bution System
ercent contingen
ercent contingen
Project Cost
improvemen
ing, construc
f recent bid r
ncy. To obta
ment, and adm
osts for stora
nd discharge
ments are pr
CITY

JECT COSTS
Project
c Performance
Upsize 12-i
Upsize 4-in
Upsize 6-in
Upsize 4-in
Upsize 4-in
Upsize 6-in
Upsize 8-in
Upsize 4-in
Upsize 8-in
Upsize 4-in
Upsize 6-in

Improvemen
ncy for constructi
ncy for engineeri
s for Storag
nt project cos
ction manag
results, inde
ain total proj
ministration
age improve
e piping, and
ovided in Ta
TABL

Y OF ANGELS

S FOR DISTR
Description
e Criteria (Bu
inch to 16-inch
nch to 6-inch
nch to 8-inch
nch to 6-inch
nch to 6-inch
nch to 8-inch
nch to 10-inch
nch to 6-inch
nch to 10-inch
nch to 6-inch
nch to 8-inch
nts
ion.
ng, construction
ge Improvem
sts are comp
ement, and a
exed to the cu
ect costs, a 2
n was added.
ements inclu
d booster pum
able 10-6.
10-5
n:\m
LE 10-5 (Cont

S WATER MA

RIBUTION SY
Length
(ft)
uildout Deman
h 2,718
186
797
1,278
237
529
355
583
914
353
648

n management, a
ments
osed of cons
administratio
urrent ENR
25 percent c
ude cost com
mping where
Chapte
mtb020401\docume
t.)

ASTER PLAN

YSTEM IMPR
Unit
Cost
($/LF)
nd)
236 64
67 1
100 8
67 8
67 1
100 5
134 4
67 4
134 12
67 2
100 6

and administratio
struction cos
on. Construc
SF-CCI, and
contingency
mponents for
e required. U
Wa
er 10: Proba
ents\_water master
N

ROVEMENTS
Base
Cost
($)
Con
42,000 7
13,000 1
80,000 9
86,000 1
16,000 2
53,000 6
48,000 5
40,000 4
23,000 1
24,000 2
65,000 7

on.
sts plus cont
ction costs a
d include a 2
for engineer
welded stee
Unit costs for
City of A
Water Master
able Project C
MTB0
r plan\final\0713 m
S
nstruction
Costa
($)
771,000
16,000
96,000
04,000
20,000
64,000
58,000
48,000
48,000
29,000
78,000
1 6
tingencies fo
are based on
20 percent
ring, constru
l storage tan
r storage
ngels
Plan
Costs
020401
mp.docx
Project
Costb
($)
964,000
20,000
120,000
130,000
25,000
80,000
73,000
60,000
185,000
37,000
98,000
1,792,000
6,780,000
or
a
uction
nks,
Angels WM
July 2013
Total pro
Ta
Zone C

1.4 MG
12-inch
12-inch
a
Include
b
Include

10.6 P
Meter sy
engineeri
review of
contingen
managem
Project c
for meter
costs are
MP
12-inch

1.4 MG

2.3 MG
Booster
a
Include
oject costs fo

PROJECT C
ank Location
C
G Storage Tank
h Supply Line
h Discharge Lin
es 20 percent co
es 25 percent co
Project Cost
stem upgrad
ing, construc
f recent bid r
ncy. To obta
ment, and adm
osts for the m
rs, boxes, rad
provided in
CITY
UNIT C
h Supply and D
G Storage Tank
G Storage Tank
r Pump Station
es cost for pavem
or the recomm
CITY

COSTS FOR R
Quanti
k
1,80
ne 3,64
ntingency for co
ontingency for en
s for Meter
de project co
ction manag
results, inde
ain total proj
ministration
meter upgrad
dio transmitt
Table 10-8.

TA

Y OF ANGELS

COSTS FOR S
Item
Discharge Pipel
k
k
n, 300 ft TDH
ment removal an
mended stor
TA

Y OF ANGELS

RECOMMEN
ty Unit
1 LS
00 LF
40 LF
onstruction.
ngineering, const
System Up
osts are comp
ement, and a
exed to the cu
ect costs, a 2
n was added.
des and conv
ters, and AM
.
10-6
n:\m
ABLE 10-6

S WATER MA

STORAGE IM
linea
nd replacement.
rage tank site
ABLE 10-7

S WATER MA

NDED STORA
Unit Cost
($)
1,400,000
150
150
truction manage
pgrade and L
posed of con
administratio
urrent ENR
25 percent c
version to an
MR system e
Chapte
mtb020401\docume

ASTER PLAN

MPROVEMEN
Unit
LF
LS
LS
LS
e alternative

ASTER PLAN

AGE TANK S
Base Cost
($)
1,400,000
270,000
546,000
Total Cost
ement, and admin
Leak Detect
nstruction co
on. Construc
SF-CCI, and
contingency
n AMR syste
equipment an
Wa
er 10: Proba
ents\_water master
N
NTS
Unit Cost
150
1,400,000
2,300,000
1,160,000
e are provide
N

SITE ALTERN
Construction
Costa ($)
1,680,000
324,000
656,000
nistration.
tion Survey
osts plus cont
ction costs a
d include a 2
for engineer
em include c
nd software.

City of A
Water Master
able Project C
MTB0
r plan\final\0713 m
($)
0 0
0 0
ed in Table 1
NATIVE
Project Co
($)
2,100,0
405,0
820,0
3,325,0
y
tingencies fo
are based on
20 percent
ring, constru
cost compon
Total projec
ngels
Plan
Costs
020401
mp.docx
10-7.
ostb
000
000
000
000
or
a
uction
nents
ct
City of Angels
Water Master Plan
Chapter 10: Probable Project Costs
Angels WMP 10-7 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 10-8

CITY OF ANGELS WATER MASTER PLAN

PROJECT COSTS FOR METER SYSTEM UPGRADE
Item Quantity Unit Unit Cost ($) Total Cost ($)
Meter Boxesa 1,790 EA 90 161,100
Meters with Encoder Registers and Radio
Transmittersb

5/8-inch 1,644 EA 320 525,300
3/4-inch 34 EA 379 12,900
1-inch 50 EA 440 22,000
1-1/2-inch 27 EA 752 20,300
2-inch 35 EA 944 33,000
3-inch 8 EA 2,832 22,700
4-inch 2 EA 3,795 7,600
6-inch 1 EA 7,082 7,100
AMR System Hardwarec
1 LS 20,750 20,800
AMR System Software 1 LS 6,820 6,800
AMR Fixed Network Transceiver 1 LS 6,880 6,900
Cellular Backhauld
1 LS 910 900
On-Site Training 1 LS 2,200 2,200
Total Base Cost 850,000
Total Construction Coste 1,020,000
Total Project Costf
1,275,000
a
Assume new boxes for 2-inch and smaller meters and existing vaults to remain for 3-inch and larger meters. b
Meter quantities by size provided by City Account Clerk on 01/31/13. c
Includes one handheld data collector and one laptop for AMR system in mobile (drive-by) mode. d
Annual cellular charge for fixed network to backhaul hourly meter reads to main computer. e
Includes 20 percent contingency for construction.
f
Includes 25 percent contingency for engineering, construction management, and administration.

Project costs for a leak detection survey of the distribution system were based on input from a local leak detection contractor and include labor costs plus a 20 percent contingency. Project costs for the leak detection survey are provided in Table 10-9.

TABLE 10-9

CITY OF ANGELS WATER MASTER PLAN

PROJECT COSTS FOR LEAK DETECTION SURVEY
Project Project Cost ($)
Leak Detection Survey 12,000
Angels WM
July 2013

10.7 P
Project c
estimated
similar st
MP
Project Cost
osts for prep
d based on th
tudies for oth
P
W
W
s for Maste
paring a wate
he cost assoc
her agencies
CITY

PROJECT CO
Water Master P
Water Rate and
r Plan and
er master pla
ciated with p
s of compara
TA

Y OF ANGELS

OSTS FOR M
Document
Plan
d Connection F
10-8
n:\m
Rate Study
an and water
preparation o
able size. Pro
ABLE 10-10

S WATER MA

MASTER PLA
Fee Study
Chapte
mtb020401\docume
r rate and co
of this Maste
oject costs ar

ASTER PLAN

AN AND RATE
Projec
1 Wa
er 10: Proba
ents\_water master
onnection fee
er Plan and r
re summariz
N

E STUDY
ct Cost ($)
00,000
40,000
City of A
Water Master
able Project C
MTB0
r plan\final\0713 m
e study were
recent costs
zed in Table
ngels
Plan
Costs
020401
mp.docx
e
for
10-10.

Angels WM
July 2013
11 C
This chap
regulatio
water dem
in descen

1. A

2. Im

3. R

4. P
The distr
importan

1. P

2. M

3. P

4. M

11.1 P
Chapter 9
and distri
consideri
miscellan
priorities
described
25 percen
Recomm

1. P

2. P

3. P

4. P

5. P
MP
Capita
pter summar
ns, treatmen
mands. The
nding order o
Addressing re
mproving rel
Replacing agi
roviding cap
ribution syste
nce:
roviding req
Meeting hydr
roviding req
Meeting hydr
Project Cost
9 summarize
ibution syste
ing priorities
neous projec
s, is presente
d in Chapter
nt contingen
mended timin
hase 1A: Ye
hase 1B: Ye
hase 1C: Ye
hase 2A: Ye
hase 2B: Ye
l Impr
rizes recomm
nt plant perfo
treatment, su
of importanc
egulatory co
liability by p
ing infrastru
pacity for fut
em CIP was
quired fire flo
raulic perform
quired fire flo
raulic perform
s
ed recommen
ems. The CIP
s is presented
cts. The CIP
ed in Table 1
10, project
ncy for engin
ng of projects
ear 1 – Year
ear 3 – Year
ear 5 – Year
ear 5 – Year
ear 11 – Yea
roveme
mended CIP
ormance, dis
upply, and s
ce:
ncerns (Pha
providing op
ucture (Phase
ture develop
prioritized b
ow for existi
mance criter
ow for futur
mance criter
nded improv
P for treatme
d in Table 1
for distribut
1-2. The com
costs includ
neering, cons
s is as follow
2 5
10 10
ar 20
11-1
n:\m
ent Pla
projects dev
stribution sys
torage CIP w
se 1A)
perational red
e 1C)
pment (Phase
based on the
ing demands
ria for existin
re (buildout)
ria for future
vements to th
ent, supply,
1-1 and incl
tion system i
mbined CIP
e a 20 perce
struction ma
ws:
mtb020401\docume
an
veloped base
stem hydrau
was prioritiz
dundancy (P
e 2A)
e following,
s (Phase 1A)
ng demands
demands (P
e (buildout) d
he City wate
and storage
ludes additio
improvemen
is included
nt constructi
anagement, a
ents\_water master
ed on a revie
ulic capacity,
zed based on
Phase 1B)
in descendin
)
s (Phase 1B)
Phase 2A)
demands (Ph
er treatment,
system imp
onal reports,
nts, also cons
as Table 11-
ion continge
and administ
MTB0
r plan\final\0713 m
ew of applica
, and project
n the followin
ng order of
hase 2B)
, supply, stor
rovements
studies, and
sidering
-3. As was
ency and
tration.
020401
mp.docx
able
ted
ng,
rage,
d
City of Angels
Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-2 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 11-1

CITY OF ANGELS WATER MASTER PLAN

CAPITAL IMPROVEMENT PROJECTS FOR TREATMENT, STORAGE, AND SUPPLY SYSTEMS Description Phase Quantity Unit of Measure Unit Cost ($/unit) Base Cost ($) Construction Cost ($) Project Cost ($) Water Treatment Plant Improvements
Install Fourth Pressure Filter 1A 1 LS 885,000 885,000 1,065,000 1,335,000 Construct Sludge Lagoons and Recycle Pump Station 1A 1 LS 520,000 520,000 625,000 785,000 Replace Existing Sedimentation Basin 1C 1 LS 990,000 990,000 1,190,000 1,490,000 Construct Second Flocculation Basin 1C 1 LS 500,000 500,000 600,000 750,000 Construct Second Sedimentation Basin 1C 1 LS 990,000 990,000 1,190,000 1,490,000 3,885,000 4,670,000 5,850,000
Water Supply Improvements - Well Site and Water Supply Route B Construct and Equip Municipal Well(s) 1B
2 EA 400,000 800,000 960,000 1,200,000
Construct 12-inch Transmission Main 30,600 LF 100 3,060,000 3,672,000 4,590,000 Install Air Release Valves 17 EA 2,000 34,000 41,000 52,000 Construct 135-ft TDH Booster Pump Station 1 LS 525,000 525,000 630,000 790,000 Construct Pressure Reducing Station 1 LS 40,000 40,000 48,000 60,000 4,459,000 5,351,000 6,692,000
Water Storage Improvements - Zone C Storage Tank Construct 1.4 MG Storage Tank 1B
1 LS 1,400,000 1,400,000 1,680,000 2,100,000
Construct Storage Tank Supply Line 1,800 LF 150 270,000 324,000 405,000 Construct Storage Tank Discharge Line 3,640 LF 150 546,000 656,000 820,000 2,216,000 2,660,000 3,325,000
Reports, Studies, and Miscellaneous Projects Leak Detection Survey 1 LS 12,000 - - 12,000 Meter System Upgrade 1 LS 850,000 850,000 1,020,000 1,275,000 Water Rate and Connection Fee Study, FY2013-2014 1 LS 40,000 - - 40,000 Water Master Plan, FY2020-2021 1 LS 100,000 - - 100,000 Water Rate and Connection Fee Study, FY2021-2022 1 LS 40,000 - - 40,000 Water Master Plan, FY2028-2029 1 LS 100,000 - - 100,000 Water Rate and Connection Fee Study, FY2029-2030 1 LS 40,000 - - 40,000 850,000 1,020,000 1,607,000
Total, Treatment, Supply, and Storage CIP 11,410,000 13,701,000 17,474,000 City of Angels
Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-3 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 11-2

CITY OF ANGELS WATER MASTER PLAN

CAPITAL IMPROVEMENT PROJECTS FOR DISTRIBUTION SYSTEM
Location Project
Description
Unit
Cost
($/LF)
Length
(LF)
Base
Cost ($)
Construction
Cost ($)
Project
Cost ($)
Phase 1A - Existing Fire Flow Deficiencies
Gold Cliff Road
Upsize 8-inch to 10-inch 134 1,144 154,000 185,000 232,000 Golden Chain Highway
Upsize 6-inch to 10-inch 134 47 7,000 9,000 12,000
Upsize 8-inch to 10-inch 134 3,316 445,000 534,000 668,000 New 6-inch main 67 49 4,000 5,000 7,000
Hillcrest Street
Upsize 6-inch to 10-inch 134 175 24,000 29,000 37,000
Upsize 8-inch to 10-inch 134 108 15,000 18,000 23,000
Mark Twain Road
Upsize 6-inch to 10-inch 134 1,740 234,000 281,000 352,000 McCauley Ranch Road
Upsize 8-inch to 10-inch 134 294 40,000 48,000 60,000
Monte Verde Street
Upsize 4-inch to 6-inch 67 281 19,000 23,000 29,000
Subtotal, Phase 1A 7,154 942,000 1,132,000 1,420,000
Phase 1B - Existing Hydraulic Deficiencies
Depot Road
Upsize 6-inch to 10-inch 134 225 31,000 38,000 48,000
Moose Trail
Upsize 4-inch to 10-inch 134 958 129,000 155,000 194,000 Murphy's Grade Road
Upsize 10-inch to 16-inch 236 995 235,000 282,000 353,000 Upsize 6-inch to 16-inch 236 1,289 305,000 366,000 458,000 Upsize 8-inch to 16-inch 236 2,673 631,000 758,000 948,000 Valecito Road
Upsize 4-inch to 6-inch 67 476 32,000 39,000 49,000
Subtotal, Phase 1B 6,616 1,363,000 1,638,000 2,050,000
City of Angels
Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-4 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 11-2 (CONT.)

CITY OF ANGELS WATER MASTER PLAN

CAPITAL IMPROVEMENT PROJECTS FOR DISTRIBUTION SYSTEM
Location Project
Description
Unit
Cost
($/LF)
Length
(LF)
Base
Cost ($)
Construction
Cost ($)
Project
Cost ($)
Phase 2A - Buildout Fire Flow Deficiencies
Replace Principal Transmission Main
Upsize 14-inch to 18-inch 258 3,508 906,000 1,088,000 1,360,000 Golden Chain Highway
Upsize 4-inch to 6-inch 67 857 58,000 70,000 88,000
Mark Twain Road
Upsize 4-inch to 6-inch 67 681 46,000 56,000 70,000
Subtotal, Phase 2A 5,046 1,010,000 1,214,000 1,518,000
Phase 2B - Buildout Fire Flow Deficiencies
12-inch Transmission Main
Upsize 12-inch to 16-inch 236 2,718 642,000 771,000 964,000 Bret Harte Drive
Upsize 4-inch to 6-inch 67 186 13,000 16,000 20,000
Depot Road
Upsize 6-inch to 8-inch 100 797 80,000 96,000 120,000
Dogtown Road
Upsize 4-inch to 6-inch 67 1,278 86,000 104,000 130,000 Fairview Drive
Upsize 4-inch to 6-inch 67 237 16,000 20,000 25,000
Gardner Lane
Upsize 6-inch to 8-inch 100 529 53,000 64,000 80,000
Kurt Drive
Upsize 8-inch to 10-inch 134 355 48,000 58,000 73,000
Mark Twain Road
Upsize 4-inch to 6-inch 67 583 40,000 48,000 60,000
McCauley Ranch
Upsize 8-inch to 10-inch 134 914 123,000 148,000 185,000 S. Baker Road
Upsize 4-inch to 6-inch 67 353 24,000 29,000 37,000
Suzanne Drive
Upsize 6-inch to 8-inch 100 648 65,000 78,000 98,000
Subtotal, Phase 2B 8,598 1,190,000 1,432,000 1,792,000
Total, Distribution System CIP 27,414 4,505,000 5,416,000 6,780,000 City of Angels
Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-5 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 11-3

CITY OF ANGELS WATER MASTER PLAN
20-YEAR CAPITAL IMPROVEMENT PLAN
Description
Project Cost Allocation ($)
Project Total FY2013-2015 ($) (Phase 1A) FY2015-2018 (Phase 1B) FY2018-2023 (Phases 1C, 2A) FY2023-2033 (Phase 2B) Water Treatment Plant Improvements Install Fourth Pressure Filter 1,335,000 - - - 1,335,000 Construct Sludge Lagoons and Recycle Pump Station 785,000 - - - 785,000 Replace Existing Sedimentation Basin - - 1,490,000 - 1,490,000 Construct Second Flocculation Basin - - 750,000 - 750,000 Construct Second Sedimentation Basin - - 1,490,000 - 1,490,000 Water Supply Improvements - Well Site and Water Supply Route B Construct and Equip Municipal Well(s) - 1,200,000 - - 1,200,000 Construct 12-inch Transmission Main - 4,590,000 - - 4,590,000 Install Air Release Valves - 52,000 - - 52,000 Construct 135-ft TDH Booster Pump Station - 790,000 - - 790,000 Construct Pressure Reducing Station - 60,000 - - 60,000 Water Storage Improvements - Zone C Storage Tank Construct 1.4 MG Storage Tank - 2,100,000 - - 2,100,000 Construct Storage Tank Supply Line - 405,000 - - 405,000 Construct Storage Tank Discharge Line - 820,000 - - 820,000 Reports, Studies, and Miscellaneous Projects Leak Detection Survey 12,000 - - - 12,000 Meter System Upgrade 1,275,000 - - - 1,275,000 Water Rate and Connection Fee Study, FY2013-2014 40,000 - - - 40,000 Water Master Plan, FY2020-2021 - - 100,000 - 100,000 Water Rate and Connection Fee Study, FY2021-2022 - - 40,000 - 40,000 Water Master Plan, FY2028-2029 - - - 100,000 100,000 Water Rate and Connection Fee Study, FY2029-2030 - - - 40,000 40,000 City of Angels
Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-6 MTB020401 July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx TABLE 11-3 (CONT.)

CITY OF ANGELS WATER MASTER PLAN
20-YEAR CAPITAL IMPROVEMENT PLAN
Description
Project Cost Allocation ($)
Project Total FY2013-2015 ($) (Phase 1A) FY2015-2018 (Phase 1B) FY2018-2023 (Phases 1C, 2A) FY2023-2033 (Phase 2B) Distribution System Projects Replace Principal Transmission Main - - 1,360,000 - 1,360,000 12-inch Transmission Main - - - 964,000 964,000 Bret Harte Drive - - - 20,000 20,000 Depot Road - 48,000 - 120,000 168,000 Dogtown Road - - - 130,000 130,000 Fairview Drive - - - 25,000 25,000 Gardner Lane - - - 80,000 80,000 Gold Cliff Road 232,000 - - - 232,000 Golden Chain Highway 687,000 - 88,000 - 775,000 Hillcrest Street 60,000 - - - 60,000 Kurt Drive - - - 73,000 73,000 Mark Twain Road 352,000 - 70,000 60,000 482,000 McCauley Ranch Road 60,000 - - 185,000 245,000 Monte Verde Street 29,000 - - - 29,000 Moose Trail - 194,000 - - 194,000 Murphy's Grade Road - 1,759,000 - - 1,759,000 S. Baker Road - - - 37,000 37,000 Suzanne Drive - - - 98,000 98,000 Valecito Road - 49,000 - - 49,000 Fiscal Year Total 4,867,000 12,067,000 5,388,000 1,932,000 24,254,000 City of Angels
Water Master Plan
Chapter 11: Capital Improvement Plan
Angels WMP 11-7 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx Total CIP costs for treatment, supply, storage, and distribution systems are summarized in Table 11-4.

TABLE 11-4

CITY OF ANGELS WATER MASTER PLAN

SUMMARY OF CAPITAL IMPROVEMENT PLAN COSTS
Component Total Cost ($)
Treatment System Improvements 5,850,000
Supply System Improvements 6,692,000
Storage System Improvements 3,325,000
Distribution System Improvements 6,780,000
Reports, Studies, and Miscellaneous Projects 1,607,000
Total Cost 24,254,000
Angels WM
July 2013
12 R
[1] An
[2] Se
Co
[3] Ci
Inc
[4] Ci
ad
[5] Int
Su
[6] An
[7] Flo
Tr
W
[8] Ci
As
[9] Ca
Ag
Ut
[10] Ca
Sta
[11] Co
23 [12] Ca
[13] Fil
an
[14] Cr
W
[15] Th
me
[16] 20
<h
[17] ECe
[18] Ci
MP
Referen
ngels Camp
econd Amen
ourse, City o
ity of Angels
c., May 2002
ity of Angels
dopted Decem
ternal City o
ubject: Conti
ngels Camp
ow Meter Re
reatment Dep
Water in our S
ity of Angels
ssociates, Inc
alaveras Cou
greement, At
tica/Angels P
alifornia Cod
andards.
orrespondenc
, 2012.
alifornia Cod
lter Backwas
d Drinking W
ryptosporidiu
ater and Env
he 2011 Annu
emorandum p
010 Improvem
http://www.ang
4 Population
ensus Counts
ity of Angels
nces
2020 Gener
ded Agreem
of Angels an
Water Mast

2. Municipal S
mber 2009.
of Angels co
inuance of th
Water Audit
eport, Intern
partment Sta
System and P
Water Trea
c., May 2012
unty Water D
ttachment A
Projects from
de of Regulati
ce from CDP
de of Regulati
sh Recycling
Water, EPA 8
um Action Pla
vironmental M
ual Inspection
prepared by T
ment Standar
gelscamp.gov/d
n Estimates
s, prepared b
Wastewater
al Plan, adop
ment for Golf
d Greenhorn
ter Plan 200
Service Revi
rrespondenc
he 2002 City
t, Prepared b
nal City of A
aff to City A
Potential Sol
atment Facili

2. District and N
A, Schedule o
m combined
ions, Title 22
H to the City
ions, Title 22
Rule Technic
816-R-02-014
an, Californi
Management,
n Summary o
Tahir Manso
rds, City of A
docs/Improvem
for Cities, C
by California
r Master Pla
12-1
n:\m
pted 3 Febru
f Course Irrig
n Creek Asso
01-2015, Pre
iew, Prepared
ce from Gare
y of Angels M
by Stetson En
Angels Corre
Administrator
lutions, Apri
ities Operati
Northern Ca
of Maximum
flow of Mil
2, Division 4
y of Angels r
2, Division 4
cal Guidance
4, December
ia Departmen
, April 1995.
of City of Ang
oor, CDPH, A
Angels, Coun
ment-Standards
Counties, and
a Departmen
an, prepared
mtb020401\docume
uary 2009.
gation Wate
ociates L.P.,
epared by We
d by LAFCO
ett Walker to
Master Plan,
ngineers, Inc
spondence f
r, Subject: G
il 20, 2012.
ions Plan, Pr
alifornia Pow
m Delivery in
ll Creek Tap
4, Chapter 16
regarding the
4, Chapter 17
e Manual, U
r 2002.
nt of Health S
.
gels Water Sy
April 7, 2011
ncil Resolutio
-2010.pdf>
d the State, 2
nt of Finance
by NV5, Inc
ents\_water master
er for Greenh
, July 1998.
eber, Ghio &
O of Calaver
o City Admin
, January 20
c., October 1
from Water/W
Growing Con
repared by W
wer Authority
n Acre-Feet
and Mill Cr
, California
2012 WTP i
, Surface Wa
S EPA Offic
Services, Div
ystem (No. 0
.
on 10-42,
2001-2010 w
e, August 20
c., April 201
MTB0
r plan\final\0713 m
horn Creek G
& Associates
ras County,
nistrator,
, 2011.
12, 2011.

Wastewater
ncerns over L
Weber, Ghio
y, Restated
to the
reek, 1995.

Waterworks
inspection, A
ater Treatmen
ce of Groundw
vision of Drin
510003),
with 2000 &
011.

12. 020401
mp.docx
Golf
s,
Lost
o &
April
nt.
water
nking
2010
City of Angels
Water Master Plan
Chapter 12: References
Angels WMP 12-2 MTB020401
July 2013 n:\mtb020401\documents\_water master plan\final\0713 mp.docx [19] Email correspondence with Jennifer Tinnin, Account Clerk, City of Angels, 19 June 2012 and 31 January 2013.
[20] IWA/AWWA Water Audit Method, American Water Works Association Water Wiser. <http://www.awwa.org/Resources/WaterLossControl.cfm?ItemNumber=48055&navItemNumber=48162> [21] Telephone communication with Garett Walker, Senior Supervisor Water/Wastewater Treatment, City of Angels, 13 June 2012, 15 June 2012, and 7 January 2013. [22] California Department of Public Health, Permit Amendment No. 03-10-96PA-001- Revised, City of Angels, Issued September 12, 1996.
[23] California Department of Public Health, Division of Drinking Water and Environmental Management, Citation No. 03-10-09C-009, Issued November 2, 2009. [24] Where does your water come from? The heritage of the Utica Power Authority, by Alan M. Patterson, Ph.D., July 2009.
[25] Brief overview of NCPA in Calaveras County as related to UPA, prepared by UPA and provided as a handout.
[26] Key Points of Settlement Agreement between Calaveras County Water District and Utica Power Authority, Roger K. Masuda, Griffith & Masuda, Water Law Counsel for UPA, March 2010.
[27] Water Supply within the North Fork Stanislaus River-Mill Creek-Angels Creek System, Roger K. Masuda, Griffith & Masuda, Water Law Counsel for UPA, March 2010. [28] Comprehensive Water Use Agreement, Between PG&E, City of Angels, and UPUD, September, 1992.
[29] Calaveras County Emergency water Supply Activities for the Communities of Murphys, Vallecito , Douglas Flat, Carson Hill, Six Mile Village, and City of Angels (Angels Camp), compiled by California Department of Water Resources, Central District, September 12, 2001.
[30] Water Treatment Plant Design, American Water Works Association and American Society of Civil Engineers, McGraw-Hill, 1998.
[31] 2003 Drinking Water Infrastructure Needs Survey and Assessment – Modeling the Cost of Infrastructure, Prepared by The Cadmus Group, Inc. for the US EPA, June 2006.

← All documents from this meeting