STAFF REPORT

PUBLIC WORKS SERVICES DEPARTMENT
DATE: July 15, 2025
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Public Works Services Director
By: Jan Balanay, Assistant Engineer
SUBJECT: CONTRACT WITH GENTRY BROTHERS INC. FOR THE FISCAL YEAR 2024- 25 PAVEMENT REHABILITATION PRO JECT IN THE AMOUNT OF
$1,543,024.50
CEQA: Exempt
Recommendation: Approve

SUMMARY
As part of the City’s Capital Improvement Program (“CIP”), the Public Works Services Department (“PWSD”) is preparing to rehabilitate the asphalt pavement on various streets in the City. The streets were identified in the Pavement Management Program and based on their usage and Pavement Condition Index (“PCI”) , have the greatest need for rehabilitation . To ensure that the City is receiving the most competitive prices and quality service for this work, the PWSD conducted a formal bid process and Gentry Brothers Inc. submitted the lowest responsive bid.

It is recommended that the City Council approve, authorize , and direct the City Manager to execute a contract with Gentry Brothers Inc. for the Fiscal Year 2024-25 Pavement Rehabilitation Project in the amount of $1,543,024.50, with a 10% contingency.

BACKGROUND
The PWSD is responsible for the maintenance and repair of approximately 147 miles of paved streets within the City. As part of the City’s Pavement Management Program, the condition of all City streets are inspected and rated on a scale of 0-100. This rating system is called the Pavement Condition Index (“PCI”) and is used to help determine C
ontract for FY 2024-25 Pavement Rehabilitation Project
July 15, 2025

Page 2 of 4 ends

which streets require asphalt pavement rehabilitation. Streets with scores below 40 are ‘failing’, and streets with s cores between 40 and 60 are considered in poor/fair condition.

Ac
cording to the Citywide Pavement Management Program , the following street segments have the highest need for repaving:
• Ca
mino Real Avenue from Eighth Avenue to Tenth Avenue – PCI of 39 • Flower Street from La Porte Street to 125 ft south of La Porte Street – PCI of 41 • Hacienda Drive from Rancho Road to Rodeo Road – PCI of 57 • La Cadena Avenue from Huntington Drive to Duarte Road – PCI of 42 • Old Oak Lane from Rodeo Road to north end of cul-de-sac – PCI of 43 • Flower Street from 125 ft south of La Porte Street to St. Joseph Street – PCI of 41 • Alley south of Live Oak Avenue from Myrtus Avenue to Tyler Avenue – PCI of 24 • Alley north of Genoa Street from Santa Anita Avenue to First Avenue - PCI of 31 I
t should be noted that PCI scores alone do not determine which streets should be repaved. F or instance, the City also takes into consideration the traffic volume of streets before determining repaving. It is also more cost-effective to repave streets prior to their PCIs lowering to a very poor condition and requiring more resources to repair. The PCI range for the specified streets require s grind and overlay rehabilitation; however, if the PCI of these streets continue to drop , more extensive rehabilitation, such as full pavement reconstruction, would be required to repair. Full reconstruction costs are much higher than grind and overlay work. A copy of the Project Location Map detailing the segments listed above is attached as Exhibit “A.” D

ISCUSSION
Th
e project involves the repair of any localized potholes and failed pavement; grinding the edges of the pavement adjacent to the gutters ; replacing broken curb and gutter as necessary ; and installing new ADA- compliant curb ramps at the intersections. The new pavement surface will utilize recycled rubber in the pavement mix to help reduce future cracking , strengthen the asphalt pavement, and reduce road noise. Following the intended repairs, the condition of these street sections should be raised to a PCI of 100.

A N
otice Inviting Bids was published in accordance with City Council Resolution No.

C
ontract for FY 2024-25 Pavement Rehabilitation Project
July 15, 2025

Page 3 of 4 ends

7483, and bid packages were provided to contractors that perform this type of work.

On June 17, 2025, the City Clerk’s office received ten bids with the following results:

Bidder Location Base Bid Amount
Gentry Brothers Inc.

Onyx Paving Company, Inc.

Hardy & Harper, Inc.

All American Asphalt
Palp, Inc. dba Excel Paving
Dash Construction Co., Inc.

United Paving Co.

Sequel Contractors Inc.

Sully-Miller Contracting Co.

Toro Enterprises, Inc.

Irwindale, CA
Anaheim, CA
Lake Forest, CA
Corona, CA
Long Beach, CA
Woodland Hills, CA
Corona, CA
Santa Fe Springs, CA
Brea, CA
Oxnard, CA
$ 1,148,330.50
$ 1,182,000.00
$ 1,240,000.00
$ 1,268,853.00
$ 1,329,423.40
$ 1,343,513.25
$ 1,360,030.58
$ 1,397,599.00
$ 1,488,579.25
$ 2,525,099.65
Based on the pricing offered, the budget allows for the inclusion of A lternate Bid Items #1, #2 and #3 to the project. Flower Street from La Porte Street to St. Joseph Street, along with the alleys south of Live Oak Avenue from Myrtus Avenue to Tyler Avenue, and north of Genoa Street from Santa Anita Avenue to First Avenue, all have low PCI scores. Residents and business owners have also requested that these street sections be rehabilitated due to performance issues.

B
id documents were reviewed for content and the contractor’s background was investigated. Based on this review, it has been determined that Gentry Brothers Inc. is the lowest responsive bidder and is qualified to complete the project. In addition to successful past work in Arcadia, Gentry Brothers Inc. has successfully completed similar projects on time and within budget for local and regional agencies in California, such as the Cities of Alhambra, Baldwin Park, Covina, Downey, Duarte, Montclair, Pomona, Rancho Cucamonga, Sierra Madre, and West Covina.

Cont
ract for FY 2024-25 Pavement Rehabilitation Project
July 15, 2025

Page 4 of 4 ends

ENVIRONMENTAL ANALYSIS
This
project is a Class 1 exemption pursuant to the California Environmental Quality Act ( “CEQA”) Section 15301, Existing Facilities. Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing , or minor alteration of existing public or private structures, facilities, mechanical equipment , or topographical features involving negligible or no expansion of use beyond that existing at the time of the lead agency’s determination.

FISC

AL IMPACT
Fund
s in the amount of $ 2,800,000 have been budgeted in the Fiscal Year 2024-25 CIP for the Pavement Rehabilitation Project. The total cost for th e Fiscal Year 2024- 25 Pavement Rehabilitation Project is $1,543,024.50. With the r equested 10% contingency, the total potential project cost would be $1, 697,326.95. Therefore, sufficient funds are available to complete this project.

RECO

MMENDATION
It is
recommended that the City Council determine this project is a Class 1 exemption under the California Environmental Quality Act (“CEQA”); and approve, authorize, and direct the City Manager to execute a contract with Gentry Brothers Inc. for the Fiscal Year 2024-25 Pavement Rehabilitation Project in the amount of $1,543,024.50, with a 10% contingency.

Attac
hments: Exhibit “A” – Project Location Map
Proposed Contract

RD
TE
RD
DR
ALTURA

CAMPESINAVALIDO

MONTE VERDE

MICHILLINDA

CAROL PINE LN

MERLON AV

CATALPA
ALTURA

MURIETTA

CATALPA

VOLANTE
DR
RD
RD
BL

HERITAGE

OAKS DR

WHISPHERING

OAKS DRCABALLO

MICHILLINDA
RAFAEL
DR

FOOTHILL
SAN

VICENTE
RD
SAN
RD

OLD RANCH
RD
DR
RD

VAQUERO

COLORADO

OLD RANCH

VERDE DON
DR

RICARDO
PABLO
DR
DON
DR DR
DIABLO

KATHERINE

WALNUT STST
DEXTER

AVMONTEPALOMAST
RDAV

ANOAKIA LN

ENCANTO

PEMBROOK
RD
RD
RD
RD
DR

GREENOAKS DR AV

HAMPTON
AV

GLENCOE
RD
DR

DRSINGING WOOD

HAMPTON
DR

GLENCOE

ORANGE GROVE
DR
SANTA

MARGARITA

CLARIDGE
RD
DR
ANDREA
DR

CHANTRY DR

LORALYN DR

ANITA CREST
ST
DR
RD
CANYON
DR

OKOBOJIRD
SUNSET

SHINING
AV
PL

STLEROY
AV

ENCINITA

AVBRENTMEAD
AV
RODEO
RD
DR

CARMELITA PL

CABALLERO

DR SYCAMORE
DR
RD

DUFFY ST

HALLOWELL AV
AV

GLICKMAN
AV

MICHILLINDA
HUGO
BLBL

PANORAMAAV
DR

FALLEN LEAF RD
AV
WY

ORLANDO

OAKLAWN

ORANGE GROVE
RD
AV
ELKINS

CANYON RD

CAROLWOOD
DR
LE
KINS

HIGHLAND
DR
CANYON
AV
RD
WILSON

HIGHLAND
AV
VISTA
PL

HILLGREEN

MARILYN

PLANGELOPL
OAKS
TOPAZ
PL
OAKS
PL
AV
AV

ROWLAND

ESTRELLA
AV
ST

MAYFLOWER
ARMIJO
AV
AV

MAYFLOWER

FAIRGREEN
EL SUR
ATARA
REAL
AV

AVTREELANE
AV
LN
ST
ST

GOLDRING
DR
MCBEAN

RANDOLPH
RD

CLARK FAIRGREEN

HIGHLAND

COGSWELL

EL NORTE ST
ST

STANDISH
AVORA
ST

RIO HONDO
RD

BUNGALOW PL

ALTA VISTA AVE

EL NORTE ST

SHORT AVE
DEREK
DR

NICHOLAS
LN
ENCINO
DR

TIFFANY
TER
CIR
ALTERN
ST
ILENE

LELAND WY
SANTA

ANITA TER
ST

CHERRYLEE
AZUSA

RDDURFEEAV

HALLWOOD
DR

ST LOWER
DR
RD
AV
EE

KIMBERLY CR

AVSTANDELLA
AV

ARMIJO ST

ROCKROSE
ST

STAGIO DR
ST
ST
ST

PECK RD

KARDASHAIN
RD
RD
ST
AV
AV
ST

CONFERENCE
PY
ST

SAN RIO

CELINE RIVERGRADE
EWELL
WY

LYNDON AVMAGNA VISTA
MONTE
REAL
NORMAN
WINNIE
CAMINO

LEROY AV
HOLLY
AV
AV
AV
AV

LNMELANIE
NAOMI
LOVELL

CAMBURY ST
NAOMI

LNMELANIE

CHRISTINE
LN

CALLITA
NAOMI
GOLDEN
WEST
DUARTE

ARCADIA
RD
WY
SHARON
AV
AV
AV
AV
AV

BALDWIN
AV
AV
AV
AV
AV
AV

DRARDSLEY
AV

ENCINITA
NAOMI

CAMINO REAL
ST
ST
SUNSET
5TH
8TH
7TH
7TH
4TH
5TH
FLORES
AV
AV
ST

WISTARIA
ST
BOLEY
AV

FOSS STEDNUEL
ST

OTHELLO

LOGANRITA

WEIDERMEYER
DR
ADUANA

LOVEJOY

BEVERLY
WY

FLAMINGO
LEYCO

CRVERNER

PLRODELL
PL
DR
DR
AV
AV AV
AV
AV AV
AV
AV
AV
AV
AV AV
AV
AV
AV
AV

WISTARIA
GRACE
LEE
AV
CR
AV

IVYLAND
AV
LOUISE

IVYLAND
LOUISE
WATSON
PALM

BIRCHCROFT
COYLE
ARTHUR
LAS

DANIMERE

WISTARIA
ALSTER

LEMONAV
AV
AV
AV
AV

AV PALM DR
ST
AV
AV
AV
AV
AV
3RD1ST
LOUISE
AV
LEMON
AV

LNSEWANEE

LONGDEN
AV
WALNUT
LN
DELTA
AV
DR
AV
FLORES
AV
AV
AV

VISTABELLA

LAS FLORES
AV

LEAFWOOD
DR
ARTHUR

AZURE WY

ROWLAND
WENDON
AV
VAL

AGNESSALTER
AV
AV
AV
AV

WISTARIA
ST
AV

STFLAHERTY
LAS
LEMON
LN
DR

SERENOEL
TERRA
AV

ROSEMARIE
WALNUT

WISTARIA

SHARON RD

LA VIDA
AV
8TH
LENORE
8TH
6TH4TH
CENTER

GARYPARKHUDDART

HEMPSTEAD
ETREEL
MAP
LYND
ST
DAINES
AVAV
AV
AV
RD

WILDFLOWER
AV
DR
ST
AV AV
AV AV

ELDORADO
STFANO
GENOA

ALICE ST

LUCILE ST

GREENFIELD PL

CHRISTINA ST
AV
MAGNA

VISTA AV

CHRISTINA

ST VISTA

ELLEN WY

ROBBINSDR
SCOTT
PL

PATRICIA
WY AV

MAGNA AV

ELKINS PL

HIGHLAND

OAKWOOD
2ND AVFOOTHILL BL
ST

ELDORADO
ST
ST
DUARTE
RD
2ND

SOUTH VIEW

COLUMBIA
SANO
DRAKE
CORTEZ
AV
DR

HUNTINGTON

FAIRVIEW

GOLDEN WEST

ARCADIA

BALDWIN

HUNGATE LN

SOUTHVIEW RD

HUNGATE LN
DR

HUNTINGTON

CORONADO

PORTOLA DR

OLD RANCH
SUNSET
DR

WOODWARD
RD
BL
BL

MICHIGAN
AV

ALTURA RD
ALTURA

DEANZA PL
DR

MAGELLAN

PALO ALTO
AV

BALBOA DR
DR
DRRD

JOAQUIN RDARMADA RD
RD

KINGSLEY

VICTORIA
DR
GOLDEN
WEST
TALLAC
DR

CABRILLO RD
DR

OLD RANCH

BLADWIN
DR
DR
AV
RD
DR
RD

ENGLISHOAK DR

COLORADO PL

SAN LUIS REY RD
LNLISA
LOMA

FOOTHILL

WOODACRE FOREST AV

COLORADO BL

CRUZSANTA
RD

SAN LUIS REY
RD

SANTA MARIA
RD

COLORADO
OXFORD

CHELSEA RD

PRINCETONDR RENOAK
WY
RD
RD

BALDWIN
AV
BL

STOXFORD DR

CAMBRIDGE DR

HARVARD DR

STANFORD DR

SAN MIGUEL RD
DR

HUNTINGTON
RD

SANTA CRUZSANTA ROSA

SAN JUANDR

SAN RAFAEL
AV
LN
CYRUS

OAK LNLEANDRAMERRY

FLORAL AV
RD

BURNELL OAKS
LN

LNASDER OAKDALE
BL
LN
DR
AV

RD LA ROSA RD
VISTA
RD
CAMINO
AV

STANDISH

MAGNOLIA
ALTERN
SHRODE

SIERRA MADRE

OAKWOOD
AV
RD
AV
PAMELA

FOOTHILL
RANCHO
RD
AV

GENOA ST
1ST AV
2ND
3RD AV
AV
ST
MORLAN
PL
ST
CLARA
SANTA
TREE
AV

RAE WY

CRYSTAL
CT

PALM DRPALM DR

AV LEMON

WISTARIA

WISTARIA
LEMON
AV
WALNUT
AV

AV LAS FLORES

LONGDEN
AV
DR
CT
WY
WY
LN
CT
REID
HUGO
DR

VOLANTE
DR

EL LOMA
DR DR
DON
DR

ROBLESDON ALVARADODON
LN
RD

AVARBOLADA

HACIENDA
AV
DR

GRAND VIEW

EL VISTA LN

VISTA DEL VALLE DR
DR
AV

COLORADO BL
AV
AV
AV
AV
2ND
3RD AV
2ND
STAV
AV1ST
1ST
ELKINS
AV
AV
VISTA
WHITE
OAK
DR
AV
DR
AV AV

ALTA OAKS
AV

DOSHIER
AV

ALTA OAKS
BL

OAKWOOD
DR

ELEVADO

MARENDALE LN
WILSON

YORKSHIRE
DR RD
ONTARE
OAKS

ORANGE GROVE AV

HIGHLAND
DR

OAKHAVEN

OAKGLEN
AV
DR

WOODLAND AV HILLCR

SYCAMORE
OAKS

VALENCIA
5TH AV
AV

FLORAL AV

FOREST AV

HAVEN AV
LORENA

NEWMAN AV
NEWMAN
HAVEN
FOREST
FLORAL
WIGWAM

AVLAUREL

NORTH VIEW AV
AV
AV
2ND
ST
4TH AV
JOYCE
AV

LA PORTE

FLOWER ST

ST JOSEPH

FRONT ST
ST

SANTA CLARA ST

WHEELER

INDIANA ST

GATEWAY DR
AV
ALTA
BONITA

CALIFORNIA

STDIAMOND DIAMOND

SALTERAV
ORA
PL

MC CLEANDR

LYNROSE
KIA
ST

BOUGE ST

DANBURY ST

LYNROSE

STDANBURY
ST

STBOGUELYNROSE ST DANESWOOD
KRISTI
CT
BISHOP

JUDITH CT
SHARON

LUBEN LN
RD
PAMELA
AV
AV

LA CADENA
AV
DR

FAIRVIEW

CAMPUS DR

DUARTE RD

EL MONTE AV
HOLLY
AV
CAMPUS
WAY
DR
AV

PARK EL MONTE
AV AV
DR

HUNTINGTON HUNTINGTON
LINDA
AV

MAGNA VISTA
AV

OLD OAK LNOAKHAVEN
RODEO
MEADOW
OAK

HACIENDA

PLOAKLAWN

OAKLAWN RD

ARBOLADA

BALDWIN AV
RD
RD
REID
CORTO

CABRILLO

HUNTINGTON
AV

LOGANRITA

DOOLITTLE
ENCINO
WY
LINDA
ST
AV

LOGANRITA
AV
LN
AV

LOGANRITA
AV

JEFFRIES
AV
AV
AV
AV
AV
AV
AV
AV

EL SUR
LN

MAGNOLIA

AVGROVECAMINO
CT

ENCINODR
SIERRA

LNLEDADRILENE

DRSIERRA
LN
PEACH-
LEDA
ST ST
ALTERN

RDPAMELA

AVNORMANAV
WY

WINNIEWY WY

WINNIEWYWINNIE
RAE WY
CONNIE
5TH
10TH
4TH
8TH
9TH

WESLEY LN
3RD
1ST
2ND

KARI WY
ILENE
LA
ALTERN
RD
ALTERN
PAMELA
PAMELA

GREENFIELD
LOUISE
AV
LOUISE
AV
AV
AVDR
LEE
WINNIE
NORMAN
AV
WINNIE

RDANDREWS
WYWY
ST
RD
TE
DR
AV
AV
AV
AV AV
AV
AV
AV
NORMAN
LN
ANITA
SANTA

VISTAMAGNA
WINNIE

ANITASANTA
PAMELA
NAOMI
LE ROY

SIERRALA
AV
AV

AZURE WY
RD
AV
EL
DR
RD
DUARTE
LE ROY
LN
FOSS
ADUANA
SANDRA
AV
LENTA

AVSANDRA
3RD2ND
AV
AV

FLORINDA
AV
DR

DANESWOOD

LYNROSE
AV
MYRTUS
AV
AV

GREENFIELD
SANDRA
LEE

EL CAPITAN
AV
LOUISE

EL CAPITAN

AVWOODRUFFAV

PLRODELL
AV
ANITA
SANTA
AV

LAS TUNAS DR

WELLAND AV
McCULLOCH AVEL MONTE AV
ST

PAL MAL AV

EL MONTE
WY

LONGLEY

HALIFAX RD

GRACEWOOD AV

WORKMAN AV
ALBERT
WY
WY
WY
WYAV
AV

GILPINLONGLEYWARREN

CAROLINEHOLLYWINTHROPBRADFORD
AV

AV SANDRA
WARREN

WOODRUFF

PERSIMMON AV

LYNROSE

ALTOSLOS

FLORENCE
ST
ST

HUDDART

GARYPARK

CHERRYLEE

CRCEDAR
AV
DR

CHERRYLEE

HEMLOCK
DR
EMBREE
ST
CELINE
LN
RAMADA
LA
AV
AV

HYLAND AV
FYFOOTHILLRTE 210

GLORIA RD

HAMPTON RD

FYFOOTHILL
RTE 210
RD

CENTENNIAL

ROSEGLEN
SIMEON

ROLYN PLACE

CORNELL DR
8TH MAGNISTULIP

SANTA YNEZ
AV

ANITASANTA

PAMELA CT

CTMAGNOLIA
LN

RODEOBL BLFOOTHILL

RAMONA RD

WOODLAND
LN

SAN CARLOS
RD

SAN CARLOS
RD

FAIRVIEW AV

SIERRALA

ST JOSEPH
ST

NEWMAN AV

WINDSORRD

PERKINS DR

VIRGINIA DR
ANDREA
LN

EL VISTA
LN
SIERRA
OAKS
DR

RANCHO RD TINDALO RD
FLORAL
AV

SAN ANTONIO RD
BONITA
ST
PAMELA

JOAQUIN
RD

LEMONAV

BALDWIN
AV

AVWOODRUFF
PALM
DR

VARUSST

PORTOLA
DR

CIELOPL
MONTE
PL
DR

STONE HOUSE
2024/2025 PAVEMENT REHABILITATION PROGRAM
PROJECT NO.: 33854025
EXHIBIT "A"

PROJECT LOCATION MAP

PROJECT

LOCATION

PROJECT

LOCATION

CITY OF ARCADIA

2024/2025 PAVEMENT REHABILITATION PROJECT
PROJECT NO.: 33854025

BETWEEN

CITY OF ARCADIA
AND
GENTRY BROTHERS, INC.

CONTRACT

Contract - 1

CONTRACT FOR THE

CITY OF ARCADIA

This CONTRACT, No. ________ is made and entered into this ____ day of __________, 2025, by and between City of Arcadia, sometimes hereinafter called “City,” and Gentry Brothers, Inc., sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:

A. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project:
2024/2025 Pavement Rehabilitation Project / Project No.: 33854025 The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation.

B. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within Ninety (90) CALENDAR DAYS calendar days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.

C. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of ONE MILLION, FIVE

HUNDRED FORTY -THREE THOUSAND, TWENTY -FOUR DOLLARS AND FIFTY CENTS ($1,543,024.50). Payment shall be made as set forth in the General Conditions.

D. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum set forth in Special Conditions , Article 1.11 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

E. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the following:

Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification

Contract - 2
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents.

All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.

F. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.

G. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the General Conditions.

H. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City’s Administrative Office or may be obtained online at dir.ca.gov and which must be posted at the job site.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]

Contract - 3
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.

CITY OF ARCADIA
By:

Dominic Lazzaretto
City Manager
GENTRY BROTHERS, INC.

By:

Signature