Cities Index.
ADU PPT 11.15.23

Atherton City Council
November 15, 2023

Document
ADU PPT 11.15.23
Meeting
November 15, 2023
Body
Atherton City Council
Original file
287 KB
Text extracted from the city's file for reading and search. Open the original on atherton.primegov.com. That file is the official record.

Town of Atherton
ADU Ordinance Update
City Council
November 15, 2023
1 Recommendation
Staff recommends that City Council conduct a public
hearing to introduce an ordinance to:
• repeal and replace Chapter 17.52 “Accessory Dwelling
Units,” and
• amend Chapter 17.36 “Public Facilities and Schools
District (PFS)” and Chapter 17.60 “Definitions.”
2 Background
Major
overhaul
of ADU
legislation
by State
2019
Town
updates
ADU
Ordinance
2020
Ongoing
changes to
State law
2020 -
2023
Town
updates to
align with
State law
Now
3 6
th Cycle
Housing Element
Process
2022 -
Now
Areas of Change
4 • Definitions
• Accessory Dwelling Use
• Maximum Number of
Units
• Floor Area Requirements
• Exemptions from
Maximum Floor Area
Requirements
• Basements
• Setback Requirements
• Height
• Heritage Trees
• Privacy, Screening and
Landscaping
• Parking Requirements
• Owner Occupancy
• Passageways and Internal
Connections
• Compliance with Applicable
Requirements
• Impact Fees
• Utilities
• Certificate of Occupancies
• Code Enforcement
• Public Facilities and School
Districts (PFS) Zoning
Controls
• “Kitchen” and “Efficiency
Kitchen” Definitions
Areas of Change – Per State Law
5 • Definitions
• Accessory Dwelling Use
• Maximum Number of
Units
• Floor Area Requirements
• Exemptions from
Maximum Floor Area
Requirements
• Basements
• Setback Requirements
• Height
• Heritage Trees
• Privacy, Screening and
Landscaping
• Parking Requirements
• Owner Occupancy
• Passageways and Internal
Connections
• Compliance with Applicable
Requirements
• Impact Fees
• Utilities
• Certificate of Occupancies
• Code Enforcement
• Public Facilities and School
Districts (PFS) Zoning
Controls
• “Kitchen” and “Efficiency
Kitchen” Definitions
(Changes required by State law)
Inserting Town Influence
6 Bonus ADU
Program
Number of ADUs
Deed Restricted
Affordability
ADUs above
Garages
Height, Setbacks,
Floor Area
Roofline, Entry
Locations,
Window
Treatments
Heritage
Trees
Flexibility for
+800sf ADUs
Review Process
Town Objectives:
1) Incentivize compliance with Town’s standards
2) Incentivize ADU development to meet the Town’s RHNA objectives Maximum Number of Units
7 (e)  (1)  Notwithstanding  subdivisions  (a)  to  (d),  inclusive,  a  local  agency shall ministerially approve an application for a building permit within a residential or mixed-use zone to create any of the following:
(A) One accessory dwelling unit or one junior accessory dwelling unit per lot with a proposed or existing single-family dwelling if all of the following apply… (B)  One detached, new construction, accessory dwelling unit that  does  not exceed four-foot side and rear yard setbacks for a lot with a proposed or existing single-family  dwelling.  The  accessory  dwelling  unit  may  be  combined  with  a junior accessory dwelling unit described in subparagraph (A)… State Law (how it used to be):
1 ADU or 1 JADU (subject to conditions)
1 detached, new construction, ADU
2 units
+
=
Maximum Number of Units
8 (e)  (1)  Notwithstanding  subdivisions  (a)  to  (d),  inclusive,  a  local  agency shall ministerially approve an application for a building permit within a residential or mixed-use zone to create any of the following:
(A) One accessory dwelling unit and one junior accessory dwelling unit per lot with a proposed or existing single-family dwelling if all of the following apply… (B)  One detached, new construction, accessory dwelling unit that  does  not exceed four-foot side and rear yard setbacks for a lot with a proposed or existing single-family  dwelling.  The  accessory  dwelling  unit  may  be  combined  with  a junior accessory dwelling unit described in subparagraph (A)… State Law (now):
1 ADU (subject to conditions)
1 JADU (subject to conditions)
1 detached, new construction, ADU
3 units
+
=
Bonus ADU Program
9 Allow the zoning code to allow two ADUs to be constructed on properties two acres or greater than area.

Housing Element Program 3.812(F):
1 ADU (subject to conditions)
1 JADU (subject to conditions)
1 detached, new construction, ADU
3 units
+
=
+
1 BONUS ADU
(+2 ACRE LOTS
ONLY)
• Timeframe:15 years
• Affordability level: “Low-Income”
Deed Restriction Component:

ADUs Above Garages
10 Height
• Maximum
height of
structure
(including
garage and
ADU)
• Roof form
Floor Area
Exemptions
• Ground level
entry
• Enclosed stairs
Privacy
• No
balconies/decks
• Window
standards
• 8 foot fencing
• Landscaping
Objective:

Incentivize compliance with Town’s setbacks by
allowing ADUs above existing or proposed detached garages Heritage Trees
11 TPZ Exceptions
• Administrative up
to 6x in the R1-A
Review Process
• Reviewed during
Planning
consideration
• 6x would require
information at
submittal of
application
Good Faith
Removal
• Asserts timeline
requirements for
ADU construction
• Asserts potential
penalties
Objective:

Incentivize compliance with Town’s setbacks by providing greater flexibility with Heritage Tree Ordinance for larger, setback compliant ADUs Next Steps
12 City
Council
• Consideration of Draft Ordinance
• Adopted Ordinance sent to State
for review
HCD
• Review of Ordinance, required
changes back to Planning Commission
and City Council for consideration.

Housing
Element
• HCD Certification of Ordinance
supports Town’s progress with
Housing Element programs
Recommendation
Staff recommends that City Council conduct a public
hearing to introduce an ordinance to:
• repeal and replace Chapter 17.52 “Accessory Dwelling
Units,” and
• amend Chapter 17.36 “Public Facilities and Schools
District (PFS)” and Chapter 17.60 “Definitions.”
13 Thank you
14

← All documents from this meeting