EL CAMINO REAL

STORMWATER AND DRAINAGE

IMPROVEMENTS

TOWN OF ATHERTON
January 22nd, 2025
Eric Biland, P.E.

FLOODING EVENTS

EL CAMINO REAL CORRIDOR

IMPACT ON COMMUNITY

FLOODING SOLUTIONS

EXISTING DRAINAGE SYSTEM

OVERVIEW

PRELIMINARY COST

ESTIMATE

CONCEPTUAL DESIGN

A G E N D A

EXISTING DRAINAGE SYSTEM

EXISTING DRAINAGE SYSTEM

REPORTED FLOODING

EL CAMINO REAL CORRIDOR
AND SITE OBSERVATIONS FROM DECEMBER 2024

IMPACT ON COMMUNITY
SAFETY
• PEDESTRIAN
• BIKING
• DRIVING

PROPERTY IMPACTS
• PROPERTY FLOODING

DRAINAGE SOLUTIONS

POINT SOLUTIONS

STORMDRAIN
SYSTEM
• Utility
Conflicts
• Available
discharge
points

INFILTRATION
WELLS
• Low
maintenance
costs
• Ineffective
• Slow draining
24”
18”

DEWATERING
SYSTEM
12”
• Stored volume: 13,500 CF
• Total pumped volume: 16,700 CF

FLOODING SOLUTION

ALTERNATIVES
• Stored volume: 9,300 CF
• Total pumped volume: 12,500 CF
• Stored volume: 4,800 CF
• Total pumped volume: 8,000 CF
• CONSTRUCTABILITY
• COSTS
• MINIMAL ENVIRONMENTAL IMPACT
• IMPROVED TRASH CAPTURE AND WATER QUALITY
• INTEGRATION WITH EL CAMINO REAL IMPROVEMENTS

PROPOSED FLOODING

ALTERNATIVES

STORM/OVERLAND
FLOW

STORM DRAIN SYSTEM

AND OVERLAND RELEASE

LOCALIZED FLOODING AND PONDING

PUMPING TO ATHERTON

CHANNEL

IS ATHERTON

CHANNEL
PEAKING?

LEVEL FLOAT IN LIFT

STATION ACTIVATED
N Y

PROPOSED DEWATERING SOLUTION

PUMPS OFF

PROPOSED SOLUTIONS OVERVIEW

DEWATERING SYSTEM

PROPOSED SOLUTIONS OVERVIEW

EL CAMINO REAL IMPROVEMENT PLAN
ENGINEER’S COST ESTIMATE

ESTIMATED PROJECT COST

ANTICIPATED OVERALL COSTS/ ALLOWANCES
Item No Item Unit Quantity Unit Price Total Cost

DESIGN / BID DOCUMENTS
1 Final Design and Bid Support LS 1 $275,000 $275,000

PERMITTING
2 Caltrans LS 1 $7,500 $7,500
3 PG&E LS 1 $30,000 $30,000

ENVIRONMENTAL
4 CEQA Processing and Environmental Assessments LS 1 $65,000 $65,000 5 Regulatory Agency Compliance LS 1 $75,000 $75,000

CONSTRUCTION MANAGEMENT
6 Construction Administration LS 1 $265,000 $265,000

CONSTRUCTION COSTS
7 Mobilization/ SWPPP/ Traffic Control LS 1 $180,000 $180,000 8 Drain Inlets/Manholes/Laterals LS 1 $455,000 $455,000 9 Horizontal Directional Drilling LS 1 $2,700,000 $2,700,000 10 Grading LS 1 $260,000 $260,000
11 Pump Station LS 1 $400,000 $400,000
13 Contingency (10% of Construction Costs) LS 1 $399,500 $399,500 Total $5,122,000
ENGINEER’S COST ESTIMATE

ESTIMATED ANNUAL

MAINTENANCE COST

ESTIMATED ANNUAL MAINTENANCE COSTS
Item No Item Unit Quantity Unit Price Total Cost

MAINTENANCE
1 Vactor Service Day 2 $4,800 $9,600
2 2-Man Crew Day 8 $1,600 $12,800
3 Pump Station Service EA 2 $3,500 $7,000
4 Screen Inserts Replacement Allowance EA 2 $2,500 $5,000 Maintenance Budget $34,400