Cities Index.
Att1 - ECR Complete Streets Concept Layouts

Atherton City Council
April 16, 2025

Document
Att1 - ECR Complete Streets Concept Layouts
Meeting
April 16, 2025
Body
Atherton City Council
Original file
11.3 MB
Text extracted from the city's file for reading and search. Open the original on atherton.primegov.com. That file is the official record.

AVENUE COLUMBIA AVENUE FIFTH,
A BUFER DESCE.
.•C
EL CAMINO_REAL
-
LANE
SEGMENT 1 - EL CAMINO REAL FROM SELBY LANE TO FIFTH AVENUE SIGNALIZED INTERSECTION

BUS STOP

WAY PARKING REMOVAL ZONE

RIKE LANE

EL CAMINO REAL
STATO NO BUTTER TO REPLACE NORTH CROSSWALK.

ADJUST CURB RAMPS AS NEEDED
SEGMENT 2 - EL CAMINO REAL FROM REDWOOD WAY TO FAIR OAKS LANE

CONCEPTUAL

NOT FOR CONSTRUCTION
REVISIONS 01062025300
ParametriX SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON 1m474.1585089

EL CAMINO REAL COMPLETE STREETS STUDY
P-1
CONCEPT 1 : ADDED SIDEWALKS & STRIPED BIKE LANES
OF 8

GLENWOOD

DETAIL FOR BUS DETAIL FOR BIKEWAY

STOP OPTIONS CROSSING DESIGN OPTIONS STRE NO SUPER

EL CAMINO REAL

STRIPED BIKE LANE
- SETH NO BUT ANE WITH NO BUFEER

VALPARAIS

COUST CURD RAMSAS

STAMPED CONCRETE
SEGMENT 3 - EL CAMINO REAL FROM ENCINAL AVENUE TO VALPARAISO AVENUE SIGNALIZED INTERSECTION (MATCH EXISTING MEDIAN)

BUS STOP - SHEET

PARKING REMOVAL ZONE
CONCEPTUAL 811.

NOT FOR CONSTRUCTION Cater ag
REVISIONS 03062025-30
Parametrix SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON EL CAMINO REAL COMPLETE STREETS STUDY P-2
CONCEPT 1 : ADDED SIDEWALKS & STRIPED BIKE LANES 2 OF 8

DESCRIPTION
GENERAL NOTE:

THE SEPARATED BIKEWAY IS SHOWN AT ROADWAY GRADE WITH RAISED BUFFERS.

THE SEPARATED BIKEWAY MAY BE INSTALLED AT SIDEWALK GRADE WITH CURB

AND GUTTER, EXCEPT AT INTERSECTIONS WHERE U-TURNS ARE PERMITTED AND OPPOSING DIRECTION TRAVEL LANES WIDTH IS LESS THAN 36'. FIFTH

AVENUE COLUMBIA AVENUE

SEE POTATO OR BUS
EL CAMINO_REAL

TE OETAIL FOR SEPARATED SE
SEGMENT 1 - EL CAMINO REAL FROM SELBY LANE TO FIFTH AVENUE SIGNALIZED INTERSECTION H LANDSCAPE AREA

PEDESTRIAN HYBRID

BEACON (PHB)

BUS STOP

SEE REMAN DESIGN OPTIONS R

CAMINO REAL

SEE EVAN DESIGN OPTIONS
NOTTIE
SEGMENT 2 - EL CAMINO REAL FROM REDWOOD WAY TO FAIR OAKS LANE

CONCEPTUAL

NOT FOR CONSTRUCTION
REVISIONS 00062025=300
ParametriX SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON *474.1585069 EL CAMINO REAL COMPLETE STREETS STUDY P-3
CONCEPT 2 - WIDER SIDEWALK & BUFFERED/PROTECTED BIKE LANES 3 OF 8
GENERAL NOTE:

THE SEPARATED BIKEWAY IS SHOWN AT ROADWAY GRADE WITH RAISED BUFFERS.

THE SEPARATED BIKEWAY MAY BE INSTALLED AT SIDEWALK GRADE WITH CURB

AND GUTTER, EXCEPT AT INTERSECTIONS WHERE U-TURNS ARE PERMITTED AND OPPOSING DIRECTION TRAVEL LANES WIDTH IS LESS THAN 36".

GLENWOOD AVENUE

STOP OPTIONOR BUS SEE DAY DISON OPTIONS FOR SEPARATED

AVENUI LOUST CURE RAMPS AS HEALE

EL CAMINO REAL EL CAMINO REAL

BIKEWAY CROSSING COOM ME SIDE BUS STOP

SEE DETAI

EE DETAIL FOR BUS

STOP OPTIONS VALPARAISO
AVENUE
SEGMENT 3 - EL CAMINO REAL FROM ENCINAL AVENUE TO VALPARAISO AVENUE SIGNALIZED INTERSECTION • LANDSCAPE AREA

PEDESTRIAN HYBRID -SHEET

BEACON (PHB)

BUS STOP

PARKING REMOVAL ZONE
CONCEPTUAL 811.

NOT FOR CONSTRUCTION Cater ag
REVISIONS 03062025-30
Parametrix SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON EL CAMINO REAL COMPLETE STREETS STUDY P-4
CONCEPT 2 - WIDER SIDEWALK & BUFFERED/PROTECTED BIKE LANES 4 OF 8

DESCRIPTION
GENERAL NOTE:

THE SEPARATED BIKEWAY IS SHOWN AT ROADWAY GRADE WITH RAISED BUFFERS.

THE SEPARATED BIKEWAY MAY BE INSTALLED AT SIDEWALK GRADE WITH CURB AND GUTTER. EXCEPT AT INTERSECTIONS WHERE U-TURNS ARE PERMITTED AND OPPOSING DIRECTION TRAVEL LANES WIDTH IS LESS THAN 36'. CONSIDER ADDING FIFTH

AVENUE COLUMBIA AVENUE

ENEMA DESON OPTION DETAIL FOR BUS
20=1

EL CAMINO REAL

SEE DETAILEY AETERNATIVEL
SEGMENT 1 - EL CAMINO REAL FROM SELBY LANE TO FIFTH AVENUE SIGNALIZED INTERSECTION LANDSCAPE AREA

PEDESTRIAN HYBRID

BEACON (PHB)

THAT BUS STOP

STRIPED BIKE LANE

VITH NO RUESEA PARKING REMOVAL ZONE

EL CAMINO REAL

SEE BEENA, DESCH OPTOM

ATHERTON AVENUE
SEGMENT 2 - EL CAMINO REAL FROM REDWOOD WAY TO FAIR OAKS LANE

CONCEPTUAL

NOT FOR CONSTRUCTION
REVISIONS 01062025300
ParametriX SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON 1m474.1585089

EL CAMINO REAL COMPLETE STREETS STUDY
P-5
CONCEPT 3 - WIDER SIDEWALK & PARTIAL BUFFERED/PROTECTED BIKE LANES 5 OF 8
GENERAL NOTE:

THE SEPARATED BIKEWAY IS SHOWN AT ROADWAY GRADE WITH RAISED BUFFERS.

THE SEPARATED BIKEWAY MAY BE INSTALLED AT SIDEWALK GRADE WITH CURB

AND GUTTER, EXCEPT AT INTERSECTIONS WHERE U-TURNS ARE PERMITTED AND OPPOSING DIRECTION TRAVEL LANES WIDTH IS LESS THAN 36'.

GLENWOOD AVENUE

STOP OPTIONOR BUS SEE DETAIL FOR SEPARATED

HIKEWAY DESIGN OPTIONS
EL CAMINO REAL _EL CAMINO REAL

CONSIDER RELOCATING FROM

SEE DETAIL FOR EAR-SIDE BUS STOP

BIKEWAY COPTIONS SEE DETAII

SEE DETAIL FOR BUS BEWAY OPTONS EPARATED

VALPARAISC AVENUE
CONSIDER URE RAMPS AS NEEDESWALK:

SEGMENT 3 - EL CAMINO REAL FROM ENCINAL AVENUE TO VALPARAISO AVENUE SIGNALIZED INTERSECTION • LANDSCAPE AREA

PEDESTRIAN HYBRID

BEACON (PHB)

BUS STOP

PARKING REMOVAL ZONE
CONCEPTUAL 811.

NOT FOR CONSTRUCTION Cater ag
REVISIONS 03062025-30
Parametrix SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON EL CAMINO REAL COMPLETE STREETS STUDY P-6
CONCEPT 3 - WIDER SIDEWALK & PARTIAL BUFFERED/PROTECTED BIKE LANES 6 OF 8

DESCRIPTION

SMATRANS BUS STOP DESSEN GUIDELNES APPENOX C, PAGE TE

BUFF ARE WHERE VEHICLE PARKING IS PROSPER POSE BUFFER NE WHERE VENICE PARKING SPEAR SEE

WARRING STALLED

NOT TO SCALE

OK BE OF RE A NG WITH NO PARKING REE FION - PANTED STRIC WITH PARKING CONCEPTUAL 811. ( SEE AS AN BEG OUTDE ORZOMAY PROTECTED CYCLE TRICKS

NOT FOR CONSTRUCTION
REVISIONS 03062028 30
Parametrix SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON EL CAMINO REAL COMPLETE STREETS STUDY P-7

BUS STOP AND BIKEWAY DESIGN DETAILS

DESCRSPTON

HOPES ONS TEATMENT TYPICALLY REQUIRES PROHIBITING VEHICLE RIGHT TURNS OR REATMENT TYPICALLY REQUIRES PROHIBITING VEHICLE RIGHT

RAINST BE BERSECTION TREATMERYS RICEMAY INTERSECTION ORTON - THOSTACE QUEUE BOYMEATS " SOURCIMO REAL / SELBY LAME ALTERNATIVE INTERSECTIOM DESIGN.

CONCEPTUAL
NOT FOR CONSTRUCTION Cater ag

REVISIONS
Parametrix SAN MATEO COUNTY TRANSPORTATION AUTHORITY / TOWN OF ATHERTON 474.1585069 EL CAMINO REAL COMPLETE STREETS STUDY P-8
INTERSECTION DESIGN DETAILS 8 OF 8

DESCRIPTION

← All documents from this meeting