Verdek LLC- 755 Main Street, Bldg 2, Suite B, Monroe, CT 06468 - Tel (203) 421-6477

VERDEK LLC
755 Main St Building 2 Suite B
Monroe, CT 06468-2830 USA
+12034216477
[email protected]
http://www.verdek.com
Estimate

ADDRESS
Ben Talavera
Town of Atherton
80 Fair Oaks Lane
Atherton, CA 94027

SHIP TO
Ben Talavera
Town of Atherton
Holbrook Park and PD Lot
Ship to TBD
ESTIMATE # 11310
DATE 09/04/2025
EXPIRATION DATE 10/04/2025

SHIP VIA PAYMENT TERMS
remote See Terms below

ACTIVITY PRODUCT DESCRIPTION QTY PRICE AMOUNT
State of California

MULTIPLE AWARD SCHEDULE
Verdek LLC
CMAS NUMBER: 3-22-10-1063. CMAS TERM
DATES: 10/31/2022 through 3/31/2029

LEVEL II

CHARGER

INSTALLATION
Scope of work:

Police Department Parking lot interior.

Make ready work for: 1 ChargePoint EV charger
level 2 dual dispensers at 100amps at the parking
stall and, 1 make ready including the pad and
conduits (no wiring pulled) for future EV charger
Level 2 at 100 amps.

Inclusion:
• 70+ feet trenching in asphalt and placing 2 PVC
conduits at 1 ½” to accommodate dual 100Amps
charger.
• Connection to the panel and installing two new
100A circuit breakers per charger.
• Backfill and repair the asphalt’s patch.
• Concrete base for each charger.
• Provide building permit.
1 59,640.00 59,640.00

LEVEL II

CHARGER

INSTALLATION
Scope of work:

Holbrook Palmer Park.
• Make ready work for: 2 new ChargePoint EV
chargers Level 2 at 100Amps and make ready for
2 more EV chargers Level 2 at 100Amps.
• Installing new bus and breakers in the existing
panel with eight 100Amps breakers to supply 2
dual chargers.
• 170 feet of trenching and conduits.
• Concrete base for each charger.
1 49,800.00 49,800.00
Verdek LLC- 755 Main Street, Bldg 2, Suite B, Monroe, CT 06468 - Tel (203) 421-6477

ACTIVITY PRODUCT DESCRIPTION QTY PRICE AMOUNT
• Provide building permit..

BOND PRICING 1 3,437.00 3,437.00
Exclusions *****EXCLUSIONS******

ANY ITEMS NOT LISTED IN THE

PROPOSAL, INCLUDING

FEASIBILITY STUDY, ELECTRICAL

ENGINEERING

STUDIES/DRAWINGS, COORDINATION
STUDY,

ARC FLASH ANALYSES, THERMAL IMAGING,

LOAD CALCULATIONS/STUDIES, ADA

ENGINEERING/STUDIES, PREMIUM TIME,

CEILING

TILES, ACCESS, TELE EXISTING CELL

SERVICE

IN THE INSTALLATION AREA NEEDS TO BE

CAPABLE OF
TRANSMITTING DATA FOR THE CHARGER.

UPGRADE OF CELL SERVICE BY BOOSTER

OR OTHER MEANS,

NETWORK, DATA, WIFI CAPABILITIES,
UPGRADES TO SERVICE ARE NOT, INCLUDE.
1 0.00 0.00
SUBTOTAL 112,877.00
TAX (9.5%) 0.00
TOTAL $112,877.00
Accepted By Accepted Date
Verdek LLC- 755 Main Street, Bldg 2, Suite B, Monroe, CT 06468 - Tel (203) 421-6477

VERDEK LLC
755 Main St Building 2 Suite B
Monroe, CT 06468-2830 USA
+12034216477
[email protected]
http://www.verdek.com
Estimate

ADDRESS
Ben Talavera
Town of Atherton
80 Fair Oaks Lane
Atherton, CA 94027

SHIP TO
Ben Talavera
Town of Atherton
Ship to TBD
ESTIMATE # 11307
DATE 09/03/2025
EXPIRATION DATE 10/03/2025

PAYMENT TERMS
See Terms below

ACTIVITY PRODUCT DESCRIPTION QTY PRICE AMOUNT
State of California
CA DGS 1-23-61-15B
CP6021B-50AL5.5 CA DGSCP6021, NA, AC Station, 2 x Type 1 Cable, 50A, 1-Phase, 18' Cable, 6' Cable Management Kit,
Pedestal Mount, 8" Touch Display, Contactless
Credit Card and RFID Reader, Cellular/Wi-Fi, UL,
Energy Star, Power Share Jumper, 1YR Parts
Warranty
3 6,680.10 20,040.30T
CP6000-
ASSURE-1
1yr Prepaid Assure Plan 3 434.60 1,303.80
CPCLDCOMMERCIAL11yr Prepaid Commercial Cloud Plan 6 364.08 2,184.48 CPSUPPORTACTIVEPriced per Station - Initial Station Activation & Configuration Service includes activation of cloud
services and configuration of radio groups, custom
groups, connections, access control, visibility
control, pricing, reports and alerts.
3 249.00 747.00
CP6000-Install
CA DGS
INSTALLATION SERVICES: per scope of work.

All Make ready and electrical infrastructure
improvements by others.
3 1,256.83 3,770.49
SUBTOTAL 28,046.07
TAX (9.5%) 1,903.83
TOTAL $29,949.90