Attachment 4
DRAFT 9/10/2026
Scope of Work CMOP Requirement Matrix
SCOPE OF WORK/PERMIT DESCRIPTION CMOP REQUIRED
Yes No CBC
Full Site Development
Demo (residence, pool, accessory structure, etc.)
G&D – retaining walls
Pool/Spa – new, replaster
Interior alterations
Detached ADU/Garage/Accessory Structures
Attached ADU/Garage
MLS – trellis, fountains, water features
Athletic/Sports Courts
Fences/Gates/Ped Gates
Generator
Roof – replace or repair (OTC)
WELO
Solar/Green MEPS
Plumbing
Electrical
Mechanical
** Pool/Spa – new, replaster
** Interior alterations
** Detached ADU/Garage/Accessory Structures
** Attached ADU/Garage
** MLS – trellis, fountains, water features
** Athletic/Sports Courts
** When submitted as stand-alone permits (not as deferred submittals for Demo, New Res, or G&D) - All ancillary scopes of work under Demo, New Res, or G&D as deferred submittals must show the items on the main plan but will not be required to submit separate CMOPs for each scope of work – unless the deferred submittals are applied for after 1 year of approval of the main plans.