Cities Index.
Agenda

Avalon City Council
September 20, 2022

Document
Agenda
Meeting
September 20, 2022
Body
Avalon City Council
Pages
4
Original file
7.7 MB
Text extracted from the city's file for reading and search. Open the original on www.cityofavalon.gov. That file is the official record.

AVALON CITY COUNCIL MEETING
TUESDAY, SEPTEMBER 20, 2022— 5:00 P.M.
410 AVALON CANYON ROAD
THIS VIRTUAL MEETING IS HELD PURSUANT TO AB 361
AGENDA
In compliance with the Americans with Disability Act, if you need special assistance to participate in this meeting, please contact the City Clerk’s Office (310) 510-0220. Notification 48 hours prior to the meeting willenable the City to make reasonable arrangements to ensure accessibility to this meeting. (28 CFR 35. 102-35.104 ADA Title II). All public records relating to an agenda item on this agenda are available for the publicinspection at the time the records are distributed to all, or a majority of all, members of the City Council. Such records shall be available at City Hall located at 410 Avalon Canyon Rd.

Due to health recommendations from the Center for Disease Control and State of CaliforniaDivision of Occupational Safety and Health (Cal/OSHA), and the declared state of emergency wherein social distancing measures have been imposed or recommended, the CITY OF AVALONS CITY COUNCIL and PLANNING COMMISSION MEETINGS SHALL GENERALLY BE AVAILABLE TO THE PUBLIC REMOTELY. The general public may attend the meeting in the Council Chambers however must adhere to social distancing requirements. The public is encouraged to watch and participate from the safety of their homes while practicing socialdistancing.

Council Chambers are open to a maximum 30 members of the general public. Once the CouncilChambers reach maximum occupancy, the general public may participate in OralCommunication and address the City Council on an agenda item in person by waiting in the City Hall Court Yard and entering the Chambers one at a time at the appropriate time. No one will be admitted into the Council Chambers who is ill or exhibiting symptoms of COVID-1 9. Additionally, the general public may participate in Oral Communication and address the City Council on an agenda items by providing comments via Zoom or by sending comments toaskcityofavalon.com.

The meeting can be viewed:

On local cable: Catalina Broadband Solutions channel 3
Streaming Online: www.cityofavalon.com/meetings *Streaming on Facebook Live: www.facebook.com/CitvOfAvalonQfficial Streaming on YouTube: hffps://www.youtube.com/CitofAvalonCA To submit comments live using ZOOM, please register in advance for this meeting:
https:!/uso6web.zoom.usfiJ82l 22680909?pwd=VjhlSGc3cDBLbzZDbSs2QlAvc3phdzOg

ZOOM PUBLIC PARTICIPATION
If you wish to speak on any item on the agenda, please register in advance by clicking the following link: https:I/uso6web.zoom.us/i1821 22680909?nwd=VihISGc3cDBLbzZDbSs2Q1 Avc3phdzo9, even when submitting this request you will need to use the raise hand” feature via Zoom during the presentation of that Agenda Item in order to confirm with the City Clerk’s Office that you wishto provide comments. 1) Join Zoom Meeting via the internet:

URL: https:ffuso6web.zoom.us/i1821 22680909?pwd=VjhISGc3cDBLbzZDbSs2Q1 Avc3phdzo9Meeting ID: 821 2268 0909

CITY COUNCIL AGENDA
SEPTEMBER 20, 2022
PAGE 2
During the meeting you will need to use the raise hand” button through Zoom at the time the Agenda Item is being presented for City Council consideration. 2) Join Zoom Meeting via Phone Conference (Voice Only):

Phone Number: (669)444-9171,
Meeting ID: 821 2268 0909
When you would like to comment during the meeting enter 9 on the phone’s key pad to activate the “raise hand” button at the time the Agenda Item is being presented for CityCouncil consideration.

Please note, the City is not responsible for the public’s use of Zoom as it relates to the software, configuration, and setting on a personal device. The public is encouraged to visit the Zoom website for information on use of this software.

CALL TO ORDER I PLEDGE OF ALLEGIANCE I INVOCATION I ROLL CALL

ANNOUNCEMENTS I WRITTEN COMMUNICATIONS

DEPARTMENT HEAD REPORTS

CITY MANAGER REPORT I CITY ATTORNEY REPORT

COUNCILMEMBER REPORTS I MAYOR REPORTORAL COMMUNICATION
Members of the public may address the City Council atthistime. No action will be taken on nonagenda items at this meeting. Speakers should limit comments to two (2) minutes each.

PRESENTATION — Southern California Edison will provide an update regarding the water supply status and the results of the customers’ water conservation efforts. (5 minutes)

CONSENT CALENDAR

1. Minutes
Although the live recording is the official record of public meetings, actions are preparedfor the Council’s approval.

Recommended Action
Approve minutes from the August 16, 2022 regular City Council Meeting.

2. Warrants
Expenditures Submitted for Approval
o Warrants in the amount of $1,276,623.86.o Three payrolls in the amount of $734,999.58.o Three electronic fund transfers totaling $190,196.02.

CITY COUNCIL AGENDA
SEPTEMBER 20, 2022
PAGE 3
Recommended Action
Approve the disbursements for August 8, 2022 through September 9, 2022 totaling $2,201,819.46.

3. Fiscal Year 2021-2022 Fourth Quarter Treasurer’s Report State and Municipal Codes require the Treasurer to submit within 30 days following each fiscal quarter a report summarizing the City’s cash and investment balances.

Recommended Action
Adopt the resolution accepting the FY21-22 Fourth Quarter Treasurer’s Report.

PUBLIC HEARING

4. Amendments to Fiscal Year 2022-2023 Miscellaneous Fee Schedule On June 8, 2022, the City Council conducted a public hearing and adopted the Fiscal Year 2022-2023 Miscellaneous Fee Schedule, Elements of the Fee Schedule need to be updated to account for new services and tees as well as to correct typographical errors.Recommended Action

1. Hear a presentation regarding amendments to the Miscellaneous Fee Schedule. 2.

Open the Public Hearing to hear public comments. 3. Close the Public Hearing. 4. Ifconsensus, adopt the fee schedule as amended.

5. General Plan Amendment GPA 22-01, Approving Revisions to the 2021-2029 Planning Cycle Housing Element Update
The Planning Commission recently recommended adoption of GPA 21-01 and associated Addendum to the General Plan to the City Council, who brought the approval to fruition on February 10, 2022. The document must be approved by the City Council by resolution.

Recommended Action

1. Open the public hearing. Hear public comment. Close the public hearing. 2. Make the finding the project is exempt from further environmental review in compliance with CEQA Guidelines Section 15164. 2. Adopt a resolution approving General Plan Amendment GPA22-O1 (2021-2029 Housing Element Update).

GENERAL BUSINESS

6. Consideration of Transportation Permit — Daniel Mello, dba Catalina Island Golf Cart Tours
On August 16, 2022 Daniel Mello, dba Catalina Island Golf Cart Tours, submitted a Transportation Permit application to the City of Avalon to perform guided autoette tours.The proposed route includes areas from the downtown area to Three Palms, Chimes Tower Road, and Botanical Gardens.

Recommended ActionDiscuss and provide direction to Staff. If consensus to approve is reached make the affirmative finding that the criteria set forth in Avalon Municipal Code Section 5-14.04 hasbeen meet.

CITY COUNCIL AGENDA
SEPTEMBER 20, 2022
PAGE 4

7. First Reading of an Ordinance Amending Chapter 5-101 of Title 5 of the Avalon Municipal Code Relating to Advertising Matter and Posting on Public Property The City wishes to amend existing guidelines for banners strung across the public rightsof-way so as to limit the amount of time a banner may be hung in a specific location.

Recommended ActionIntroduce and waive all readings of an ordinance of the City of Avalon amending Chapter 5-1.01 of Title 5 of the Avalon Municipal Code Relating to Advertising Matter and Posting on Public Property.

8. New Ambulance Purchase
Fire personnel are working with Republic EVS in Santa Fe Springs to identify an appropriate replacement for Rescue 4. As a part of the service agreement, Republic EVS will resell Rescue 4 to offset the cost of a new vehicle. Fire Personnel has determined that the 2023 Ford E-350 is the most appropriate vehicle for Avalon — whilealso being the less expensive option.

Recommended Action
Authorize the Fire Chief to purchase a new 2023 Ford E350 4x2 Gasoline Powered Chassis, Cutaway Van for a not to exceed sum of $250,000.

CLOSED SESSION

1. CONFERENCE WITH LEGAL COUNSEL — EXISTING LITIGATION
Name of Case: Island Enterprises, et al. v. City of Avalon, et al.

Case Number: 2OLBCVOO291

ADJOURN

NOTICE OF POSTING
I, Devin Elise Hart, declare that the City Council Agenda for Tuesday, September 20, 2022 was posted on Thursday, September 14, 2022 on the City’s website www.cityofavalon.com, and atCity Hall, 410 Avalon Canyon Road.

Devin Elise Hart, Management Analyst

CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 AGENDA ITEM: 1
ORIGINATING DEP: City Clerk CITY MANAGER: aAL..

PREPARED BY: Gabrielle Morones, Deputy City Clerk
SUBJECT: City Council Minutes
RECOMMENDED ACTION(S): Approve minutes from the August 16, 2022 regular City Council Meeting.

REPORT SUMMARY: Although the live recording is the official record of publicmeetings, minutes are prepared for the Council’s approval.FISCAL IMPACTS: N/A.

GOAL ALIGNMENT: Not Aligned.CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: N/A.

FOLLOW UP ACTION: File minutes in the City Clerk’s office.

ADVERTISING, NOTICE AND PUBLIC CONTACT: The item was properly listed onthe posted agenda pursuant to the Brown Act.ATTACHMENTS:
1) August 16, 2022 Regular City Council Minutes.

AVALON CITY COUNCIL MEETING
TUESDAY, AUGUST 16, 2022— 5:00 P.M.

MINUTES
Due to health recommendations from the Center for Disease Control and State of California Division of Occupational Safety and Health (Cal/OSHA), and the declaredstate of emergency wherein social distancing measures have been imposed orrecommended, the CITY OF AVALONS CITY COUNCIL and PLANNINGCOMMISSION MEETINGS SHALL GENERALLY BE AVAILABLE TO THE PUBLICREMOTELY. The general public may attend the meeting in the Council Chambers however must adhere to social distancing requirements. The public is encouraged to watch and participate from the safety of their homes while practicing social distancing.

Council Chambers are open to a maximum 30 members of the general public. Once theCouncil Chambers reach maximum occupancy, the general public may participate inOral Communication and address the City Council on an agenda item in person by waiting in the City Hall Court Yard and entering the Chambers one at a time at the appropriate time. No one will be admitted into the Council Chambers who is ill or exhibiting symptoms of COVID-19. Additionally, the general public may participate in Oral Communication and address the City Council on an agenda items by providing comments via Zoom or by sending comments to askcityofavaIon.com.CALL TO ORDER- 5:00 p.m.

ROLL CALL- Present via Teleconference and In-Person: Mayor Anni Marshall,Councilmembers Lisa Lavelle, Michael Ponce, Mary Schickling and Yesenia De La Rosa. Also present: City Manager David Maistros, City Attorney Scott Campbell andDeputy City Clerk Devin Hart.

WRITTEN COMMUNICATIONS-None.

PRESENTATION — Stephanie Pace Brown, Executive Vice President of SMARlnsights,presented summary results of the 2022 Love Catalina Island Stakeholder Survey.

CONSENT CALENDAR-There were 6 Items on the Consent Calendar, Motion toapprove Items #1-#6 made by Michael Ponce, seconded by Yesenia De La Rose. (All Ayes)

1. Minutes
Approved minutes from the August 2, 2022 regular City Council Meeting.

2. Warrants
Approved warrants in the amount of $617,114.38, one payroll in the amount of $237,337.57, and three electronic fund transfers totaling $81,005.11 totaling$935,457.06 for July 25, 2022 through August 5, 2022 totaling.

CITY COUNCIL AGENDA
AUGUST 16, 2022
PAGE 2

3. Findings to Continue to Hold Remote TeleconferenceNirtual City Council Meetings Pursuant to Assembly Bill 361
Determined that the COVID-19 state of emergency proclaimed by the Governor still exists and has been considered by the City Council in deciding to continue to have teleconference meetings and that state or local officials have imposed orrecommended measures to promote social distancing in connection with COVID 19, and that as a result of the COVID-19 emergency, meeting in person would present imminent risks to the health or safety of attendees.

4. Adopt an Ordinance Amending Chapter 9-7.10A02 of Title 9, Planning and Zoning, of the Avalon Municipal Code Relating to Temporary Use Permits Adopted Ordinance No. 1207-22 amending Title 9, Chapter 9-7, Article 1OA of the Avalon Municipal Code, providing for the Authorizing Administrative Approvalof Temporary Use Permits.

5. New Copier Contract
Authorized the City Manager to execute an agreement with MRC Smart Technology Solutions for a 60-month lease and service agreement on the Xerox AltaLink Color Multi-function printer/copier.

6. Resolution Supporting Broadband Infrastructure
Adopted Resolution No. 22-47 of the City Council of the City of Avalon, California, supporting efforts to expand or develop Broadband Infrastructure for the Benefit of the citizens of the City of Avalon and Santa Catalina Island.

GENERAL BUSINESS

7. Introduce and Waive All Readings of an Ordinance Repealing and Replacing Title 5. Chapter 5, Article 13 of the Avalon Municipal Code Regarding Noise Introduced and waived all further readings of an ordinance repealing and replacing Title 5, Chapter 5, Article 13 of the Avalon Municipal Code regardingnoise.Motion to approve made by Michael Ponce, seconded by Lisa Lavelle (All Ayes).

Mayor Marshall adjourned the meeting at 6:33 p.m.

I, Gabrielle Morones, Deputy City Clerk, do hereby certify that the DVD videotape of the Regular City Council Meeting on August 16, 2022, is the official record of the Council Meeting and is on file and maintained in City Hall.

Gabrielle Morones, Deputy City Clerk / Sr. Administrative Assistant

CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 AGENDA ITEM: 2-
ORIGINATING DEP: Finance
PREPARED BY: Matthew Baker, Finance Director
SUBJECT: Warrants
CITY MANAGER:

RECOMMENDED ACTION(S): Approve the disbursements for August 8, 2022 throughSeptember 9,2022 totaling $2201819.46.REPORT SUMMARY: These disbursements through September 9th are comprised of warrants totaling $1,276,623.86, three payrolls totaling $734,999.58, and other electronic fundtransfers totaling $190,196.02.

ITEM DESCRIPTION AMOUNT DATE
GE US BANK WARRANTS CK# 34717-34881 $ 1,276,623.86 09/02/22 PAYROLL 23934656 08/12/22
PAYROLL 238,597.36 08/26/22PAYROLL 257,055.66 09/09/22EFT -CALPERS MEDICAL 71402.71 09/02/22EFT -CALPERS RETIREMENT 35,845.41 08/08/22EFT -CALPERS RETIREMENT 35,739.57 08/12/22EFT -CALPERS RETIREMENT 36,793.95 09/08/22 EFT - HARBOR/REC CREDIT CARD AND BANK SERVICE FEES 10,414.38 09/09/22 TOTAL DISBURSEMENTS $ 2,201,819.46
GOAL ALIGNMENT: Ongoing meeting of City obligations.

FISCAL IMPACTS: There are sufficient funds available, and the FY21-22 Budget and FY22-23 Budget.
the expenditures are included in
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: N/A
FOLLOW UP ACTION: N/A
ADVERTISING, NOTICE AND PUBLIC CONTACT: Pursuant to the Brown Act.ATTACHMENTS: Audit Certificate, Warrant List, US Bank Credit Card Details

CITY OF AVALON
AUGUST 8,2022 - SEPTEMBER 9,2022 DISBURSEMENTS
September 20, 2022

ITEM DESCRIPTION AMOUNT DATE
GF US BANK WARRANTS CK# 34717-34881 $ 1,276623,86 09/02/22PAYROLL 239,346.56 08/12/22PAYROLL 238,597.36 08/26/22PAYROLL 257,055.66 09/09/22EFT - CALPERS MEDICAL 71,402.71 09/02/22EFT- CALPERS RETIREMENT 35,845.41 08)08/22EFT - CALPERS RETIREMENT 35,739.57 08/12/22EFT - CALPERS RETIREMENT 36,793.95 09)08/22EFT’ HARBOR/REC CREDIT CARD AND BANK SERVICE FEES 10,414.38 09/09/22 TOTAL DISBURSEMENTS $ 2,201,819.45

CERTIFICATE
IN ACCORDANCE WITH SECTION 32702

OF THE GOVERNMENT CODE, I CERTIFYTHAT THE ABOVE DEMANDS ARE ACCURATEAND THAT FUNDS ARE AVAILABLE FOR PAYMENT.

APPROVED AND AUDITED THIS20TH DAY OF SEPTEMBER 2022 I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING IS TRUE ANDCORRECT.

AUDIT COMMITTEE - LISA LAVELLE EXECUTED THIS 20TH DAY OF SEPTEMBER 2022AUDIT COMMITTEE -MARY SCHICKUNG FINANCE DIRECTOR -MATTHEW BAKER

CITY OF AVALON
AUGUST 8,2022 - SEPTEMBER 9,2022 DISBURSEMENTS
September 20, 2022

TRILLIUM SOLUTIONS INC

AVALON ENVIRONMENTAL SVCS

BROWN, MARISALONG, DAVID

CATALINA ISLAND COMPANYCI PA

DEWEY PEST CONTROLDION & SONS MARINE FUELS INCHDLCOREN &CONELIEBERT CASSIDY WHITMORE MASARICOH USA, INC.

SIRIAS CLEANING SERVICETOWNSEND PUBLIC AFFAIRS, INCVEGA, EDMLNDO

XEROX CORPORATION

BEST, BEST & KRIEGFR, LLP

CATALINA ISLAND MEDICAL CENTER

DELTA DENTAL

FIDELITY SECURITY LIFE INSURANCE
STANDARD INSURANCE COMPANYAAA OIL, INCACTION SALES & METAL CO.AIR SOURCE INDUSTRIESAMAZON CAPITAL SERVICES, INC.

AMAZON CAPITAL SERVICES, INC.ARIENS SPECIALTY BRANDS LLCAT & T

AVALON FREIGHT SERVICES, LLC

HICKMAN, JESSICA

AVALON MOORING & DIVING
BASIN MARINEBEST, BEST & KRIEGER, lIP

BEYOND SOFTWARE SOLUTIONSBOGARD, FELICIABOGARD, FELICIABOYD, MARYBOYD, RAY

CALISE, MARIA

CASSIDY, SI-ANACATALINA BEVERAGE CO

CATALINA BROADBAND SOLUTIONSCATALINA CHAMBER OF COMMERCE

CATALINA CHAMBER OF COMMERCECATALINA COASTAL TOURS & FISHINGCATALINA EXPRESSCATALINA ISLAND COMPANYCATALINA PEST CONTROL

VOID - INVOICING ERROR
CONTRACT SERVICES, SWEEPER - 07/2022
RETIREE INSURANCE - 08/2D22
CONTRACT SERVICES - 07/2D22
RENTS 08/2022

SIR BALANCE
SERVICE’ ADMINISTRATION

FUEL - HARBOR
SERVICE - FINANCEANNUAL DUES FY23
DUES - 09/2022COPIER LEASE - PLANNING2ND HALF 08/2022
SERVICE’ ADMINISTRATIONCONTRACT SERVICES 08/202’COPIER LEASES ADMINISTRATION LEGAL FEES’ 06/2D22

SALES TAX PASS THRU
DENTAL’ 08/2022
VISION -08/2022
LIFE INSURANCE 08/2022FUEL’ALL DEPARTMENTSSUPPLIES -PUBLIC WORKS/HARBOR SERVICE ‘FIRE
VOID’MULTI STUB CHECK

SUPPLIES -ALL DEPARTMENTS
UNIFORMS’PUBLIC WORKS
COMMUNICATIONS ‘ALL DEPARTMENTS

FREIGHT-ALL DEPARTMENTS

SERVICE - RECREATIONSERVICE HARBORSUPPLIESHARBOR
LEGAL FEES - 07/2D22
CONTRACT SERVICES’II

VOID -ENTRY ERROR

REFUND-RECREATION FEES
REFUND - RECREATION FEESREIMB 0/P COSTSREFUND - RECREATION FEES

SERVICE - ADMINISTRATION

SUPPLIES - ALL DEPARTMENTS

INTERNET-AL DEPARTMENTS

FIREWORKS DONATION
TOT - 09/2022
CONTRACT SERVICES - 09/2022TRAVEL-CITY COUNCIL/SHERIFFS/USC BANDSENIOR MEALS - 07/2022SERVICE -HARBOR

AMOUNT NAME DESCRIPTION

CHECK DATE

NUMBER ISSUED
3471] 08/31/2022 (3,600.00)34738 08/19/2022 151,202.4834739 08/19/2022 605.83 34740 08/19/2022 7,200.0034741 08/19/2022 8,118.00
34742 08/19/2022 6,013.49
34743 08)19/2022 336.0034744 08/19/2022 803,1634745 08/19/2022 1,386.9734746 08/19/2022 900.0034747 08/19/2022 918.50 34748 08/19/2022 170.90
34749 08/19/2022 9,357.91
34750 08/19/2022 5,000.00
34751 08/19/2022 15,203.3334752 08/19/2022 1,080.3034753 08/26/2022 15,193.2134754 08/26/2022 253,124.64 34755 08/26/2022 6,930.2234756 08/26/2022 1,080.24
34757 08/26/2022 1,205.89
34758 09/02/2022 9,251.83
34759 09/02/2022 9,461.45
34760 09/02/2022 83.20
34761 09/01/2022 -34762 09/02/2022 10,988.7434763 09/02/2022 969.2834764 09/02/2022 1,179.62 34765 09/02/2022 911.2034766 09/02/2022 2,083.6034767 09/02/2022 138.8534768 09/02/2022 2,379.17 34769 09/02/2022 16,628.27
34770 09/02/2022 5,108.00
34771 09/01/2022 (158.40)34771 09/02/2022 158.4034772 09/02/2022 144.0034773 09/02/2022 403.47 34774 09/02/2022 54.00
34775 09/02/2022 1,955.0034776 09/02/2022 5,927.5834777 09/02/2022 2,053.7034778 09/02/2022 4,463.9734/79 09/02/2022 104,500.00 34780 09/02/2022 24,083.3334781 09/02/2022 4,216.50
34782 09/02/2022 422.4034783 09/02/2022 248.00

Page 1 of 4 ends

CITY OF AVALON
AUGUST 8,2022 - SEPTEMBER 9,2022 DISBURSEMENTS
September 20, 2022
CHECK

NUMBER NAME

CDW GOVERNMENTCISNEROS, JUANCOSTELLO, KELLIECRUZ, ERICA DAPEER, ROSENBLIT & LITVAK,LLPDAVIS FARR LLPDEGNAN, TRACIDEWEY PEST CONTROLDION & SONS MARINE FUELS INCEDISONEMS SAFETY SERVICES, INCFERGUSON WATERWORKSFIRE ACE INC.FIRST SECURITY FINANCEFORTE PAYMENT SYSTEMS, INC

GALLS, LLCGANAHL LUMBER COMPANYGARCIA, BEHYJOGRAINGERGRISSOM, MAUREEN

HOL COREN & CONEHERNANDEZ, ARACELIHERNANDEZ, IRMAHOFFMANN, EDWARD C, JORDAHL CONSTRUCTtONJP COOKE
KEELINE, RYANL.N. CURTIS & SONSLAWSON PROOUCTSLINDE GAS & EQUIPMENT INC.LLEWELLYN SUPPLY CO.LOS ANGELES COUNTY FIRE DEPARTMENTMACHADO, SANDRAMACKTAL, JOHNMANAGED HEALTH NETWORKMARINE DIESEL SERVICES, INC.MATTHEWS INTERNATIONAL CORPORATIONM CM A STE R-CARRMED-TECH RESOURCE, INC.MM INTERNET, INC.MOFFATF & NICHOLMONTANO, AVAE

DESCRIPTION
SUPPLIES - ITREIMB 0/P COSTSREFUND - RECREATION FEESREFUND - RECREATION FEESSERVICE - VEHICLESSERVICE - FINANCEREFUND - RECREATION FEES

SERVICE - CEMETERY, PUBLIC WORKS, ADMIN

FUEL - HARBORUTILITIES - ALL DEPTS

TRAINING - FIRE

SUPPLIES - PUBLIC WORKS

SERVICE - HARBOR, FIRE

LEASE PAYMENT-JMF

SUPPLIES - RECREATION

UNIFORMS - SCHMIDT

SUPPLIES - RECREATION
RETIREE INSURANCE - 09/2022

SUPPLIES - PUBLIC WORKS

REFUND - RECREATION FEESSERVICE - FINANCEREFUND - RECREATION FEESREFUND - RECREATION FEESSERVICE - RECREATIONSUPPLIES, HHW DISPOSAL

SUPPLIES - FINANCE
REIMB 0/P COSTSUNIFORMS - FIRE

SUPPLIES - HARBOR

SUPPLIES - HARBORSUPPLIES - HARBORPERMIT FEES - FUEL DOCK/GARAGE/WWTP

REFUND - RECREATION FEES

SUPPLIES - GARAGESERVICE -ADMINISTRATIONSUPPLIES - HARBORSUPPLIES -CEMETERYSUPPLIES - PUBLIC WORKSSUPPLIES - FIRECOMMUNICATIONS -ALL DEPARTMENTSSERVICE - PLANNING

REFUND - RECREATION FEES
DATE

ISSUED AMOUNT
34784 09/02/2022 2,601.37
34785 09/02/2022 260.7734786 09/02/2022 36.0034787 09/02/2022 72.0034788 09/02/2022 64.5034789 09/02/2022 10,000.0034790 09/02/2022 72.OD34791 09/02/2022 482.0034792 09/02/2022 2,311.4934793 09/02/2022 38,944.9734794 09/02/2022 250.0034795 09/02/2022 12,381.9134796 09/02/2022 1,453.50 34797 09/02/2022 137,010.49
34798 09/02/2022 195.51
34799 09/02/2022 322.3434800 09/02/2022 1,732.3934801 09/02/2022 774.1934802 09/02/2022 4,330.3534803 09/02/2022 54.0034804 09/02/2022 1,444.8934805 09/02/2022 36.0034806 09/02/2022 18.0034807 09/02/2022 800.0034808 09/02/2022 706.0634809 09/02/2022 83.5534810 09/02/2022 360.0934811 09/02/2022 209.7634812 09/02/2022 999.69 34813 09/02/2022 897.16
34814 09/02/2022 543.36
34815 09/02/2022 12,608.0034816 09/02/2022 72.0034817 09/02/2022 690.9934818 09/02/2022 286.0034819 09/02/2022 4,287.5634820 09/02/2022 2,321.8734821 09/02/2022 1,713.2934822 09/02/2022 230.2334823 09/02/2022 344.1034824 09/02/2022 1,017.0034825 09/02/2022 86.40

Page 2 of 4 ends

CITY OF AVALON
AUGUST 8,2022 - SEPTEMBER 9,2022 DISBURSEMENTS
September 20, 2022

CHECK DATE

NUMBER ISSUED AMOUNT

MONTROSE ENVIRONMENTAL SOLUTIONSMORONES, GABRIELLEMRC SMART TECHNOLOGY SOLUTIONSNALUAI, ANGELANAPA AUTO PARTSNATIONAL LEAGUE OF CITIES SAN DIEGO COFFEE, TEA & SPICE, INC.OUTDRIVE EXCHANGE

PEDROZA, MARISOL
POLYDYNE, INC.

QUA DIE NTQUILL CORP

QUINTANA, CAIILIN
RICOH AMERICAS CORPRICOH USA, INC.

R!OS, DIANARODRIGUEZ. MELISAROMO. DONNAROSENOW SPEVACEK GROUP, INC SALVO, DONSCOTT, SHARVNSPECIALTY DOORSSUPERION. LLCTHOMPSON. DEVIN

TRILLIUM SOLUTONS INC

UNDERGROUND SERVICE ALERT/SC

CORPORATE PAYMENT SYSTEMSCORPORATE PAYMENT SYSTEMS

CORPORATE PAYMENT SYSTEMS
VERIZON WIRELESSWALTERS W’OLESALE ELECTRIC CO

WESTRIDGE ENVIRONMENTAL GROUP

DESCRIPTION
CONTRACT SERVICES -07/2022

REFUND RECREATION FEESSUPPLIES ADMINISTRATIONREFUND RECREATION FEES SUPPLIES. GARAGEANNUAL DUES FY23SUPPLIES - FIRESUPPLIES - HARBOR

REFUND - RECREATION FEES

SUPPLIES - WWTP

POSTAGE REFILL

SUPPLIES - ALL DEPARTMENTS

REFUNDS RECREATION FEESCOPIER LEASE - PLANNINGCOPIER LEASE - PLANNING

REFUND - RECREATION FEESREFUND - RECREATION FEES
REIMB 0/P COSTS

SERVICE - HOUSING & SUCCESSOR AGENCIES

REFUND - RECREATION FEESSERVICE - RECREATIONSERVICE-FIRE

SOFTWARE LEASE - FINANCE
REIMB 0/P COSTSSERVICE - TRANSIT

SERVICE - PUBLIC WORKSVOID - MULTI STUB CHECKVOID -MULTI STUB CHECKSEE ATTACHED DETAILCOMMUNICATIONS - ALL DEPARTMENTS

SUPPLIES - HARBOR

SUPPLIES - WWTP
NAME
34826 09/02/2022 125,386.0134827 09/02/2022 86.4034822 09/02/2022 112.48 34829 09/02/2022 72.00
34830 09/02/2022 1,443.4434831 09/02/2022 871.0034832 09/02/2022 225.60 34833 09/02/2022 1,903,9434834 09/02/2022 36.0034835 09/02/2022 8,077.7834836 09/02/2022 1,056.70 34237 09/02/2022 2,617.0434838 09/02/2022 54.00
34839 09/02/2022 908.91
34840 09/02/2022 423.4834841 09/02/2022 72,0034842 09/02/2022 72.00 34843 09/02/2022 69.0034844 09/02/2022 1,635.0034845 09/02/2022 36.0034846 09/02/2022 828.0034847 09/02/2022 1,812.1234848 09/02/2022 3,554.3834849 09/02/2022 846.9634850 09/02/2022 6,728.0034851 09/02/2022 41.50 348S2 09/01/2022 -
34853 09/01/2022 - 34854 09/02/2022 20,035.74
34855 09/02/2022 1,827.44348S6 09/02/2022 333.6034857 09/02/2022 5,721.85

Page 3 of 4 ends

CITY OF AVALON
AUGUST 8, 2022 - SEPTEMBER 9, 2022 DISBURSEMENTS
September 20, 2022
AT & T

A VA LON MOOR NG & DIVIN CCATALINA ISLAND MEDICAL CENTER

DION & SONS MARINE FUELS INC

DTSCEMPLOYMENT DEVELOPMENT DEPARTMENTESG ENGINEERINGESC ENGINEERINGESE ENGINEERING

ESG ENGINEERINGESG ENGINEERING

ESG ENGINEERINGESG ENGINEERINGESG ENGINEERINGESG ENGLNEERING MARINE DIESELSERVICES, INC.MONTAGUE, STEVEMONTROSE ENVIRONMENTAL SOLUTIONSPTM DOCUMENT SYSTEMS

UNDERGROUND SERVICE ALERT/SC

AVALON MOORING & DIVING

BOGARD, ANGELABOGARD, FELICIA

COMMUNICATIONS
- ALL DEPARTMENTS

SERVICE - HARBOR

EMPLOYEE SCREENING
WORKERS COMP FY22

FUEL - HARBOR
2021 DUES - HHW

UNEMPLOYMENT INSURANCE

SERVICE - PUBLIC WORKSSERVICE - PUBLIC WORKS

SERVICE - PUBLIC WORKSSERVICE - PUBLIC WORKSSERVICE - PUBLIC WORKSSERVICE - PUBLIC WORKSSERVICE - PUBLIC WORKS

SERVICE -PUBLIC WORKSSERVICE - PUBLIC WORKS
SUPPLIES’HARBOR
MEDICAL REIMBURSEMENT 02-06/2022EMERGENCY MAINTENANCE - WWTP

SUPPLIES - FINANCE

SERVICE
- PUBLIC WORKS

SERVICE - HARBOR
REFUND
- RECREATION FEES

REFUND -RECREATION FEES
$ 1,276,623.86

AMOUNT NAME DESCRIPTION

CHECK DATE

NUMBER ISSUED
34838 09/02/2022 607.9034859 09/02/2022 12873.13348G0 09/02/2022 388.003861 09/02/2022 IG,886.02 CIRA34862 09/02/2022 34.58 34863 09/02/2022 13.0034864 09/02/2022 107.0034865 09/02/2022 2,062.50 34866 09/02/2022 4,611.2534861 09/02/2022 23,141.5034868 09/02/2022 T,464.00 34869 09/02/2022 T6,006,2334870 09/02/2022 15,629.7534871 09/02/2022 1,360.0034872 09/02/2022 2,161.3834873 09/02/2022 1,362.50 34874 09/02/2022 680.0034875 09/02/2022 2,775.24
34876 09/02/2022 46,082.8734877 09/02/2022 560.7034878 09/02/2022 36.40 34879 09/02/2022 1,026.1334880 09/02/2022 72.0034881 09/02/2022 86.40

Page 4 of 4 ends

CITY OF AVALON
US BANK CREDIT CARD CHARGES PAID SEPTEMBER 2, 2022
September 20, 2022

LAST NAME POST DATE AMT USD VENDOR DESCRIPTION DEPARTMENT HERNANDEZ 7/18/2022 22.55 EBAY GARAGE SUPPLIES PUBLIC WORKSHERNANDEZ 7/19/2022 237.75 PEBBLY BEACH BUILDING SUPPLY MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/1/2022 15.15 CHET’S HARDWARE MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/1/2022 33.85 CHETS HARDWARE MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/8/2022 13.77 VONS YELLOWJACKET CONTROL PUBLIC WORKSHERNANDEZ 8/10/2022 15.38 CHETS HARDWARE MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/12/2022 11.38 VONS MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/12/2022 1209.17 PEBBLY BEACH BUILDING SUPPLY HARBOR MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/15/2022 42.89 CHETS HARDWARE MAINTENANCE SUPPLIES PUBLIC WORKS HERNANDEZ 8/15/2022 52.98 CHETS HARDWARE MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/15/2022 26.38 CHETS HARDWARE MAINTENANCE SUPPLIES PUBLIC WORKSHERNANDEZ 8/15/2022 10.98 CHETS HARDWARE MAINTENANCE SUPPLIES PUBLIC WORKS GONZALES 7/25/2022 18.89 VONS MEETING SUPPLIES FINANCE
GONZALES 7/28/2022 6.75 LA COUNTY REAL ESTATE NOTICE OF EXEMPTION COPIES FINANCEGONZALES 8/12/2022 267.68 HOTEL METROPOLE LODGING - CITY ATTORNEY FINANCE RADDE 8/2/2022 82.96 CYBERLINK NETWORK SERVICE - IT ADMINISTRATIONRADDE 8/3/2022 26.16 VAST CONFERENCE COMMUNICATIONS ADMINISTRATIONMORONES 8/12/2022 19.99 GALLUP TRAINING ADMINISTRATIONMORONES 8/15/2022 150.00 CAPTUS PRESS INC. TRAINING ADMINISTRATION HART 7/20/2022 600.00 CALCITIES.ORG CONFERENCE REGISTRATION ADMINISTRATIONHART 8/8/2022 92.27 NAME TAG INC. OFFICE SUPPLIES ADMINISTRATIONHART 8/10/2022 58.29 YISTAPRINT OFFICE SUPPLIES ADMINISTRATIONMAISTROS 7/20/2022 600.00 CALCIT!ES.ORG CONFERENCE REGISTRATION ADMINISTRATIONMAISTROS 7/22/2022 600.00 CALCITIES.ORG CONFERENCE REGISTRATION ADMINISTRATIONMAISTROS 8/2/2022 338.79 VISTAPRINT OFFICE SUPPLIES ADMINISTRATION CARSTARPHEN 6/27/2022 916.98 MONARCH PRODUCTS PATROL BOAT MAINTENANCE HARBORCARSTARPHEN 6/29/2022 3.99 WEATHERFLOW WEATHER SERVICE MEMBERSHIP HARBORCARSTARPHEN 7/11/2022 9.32 CHETS HARDWARE HARBOR MAINTENANCE SUPPLIES HARBORCARSTARPHEN 7/11/2022 574.01 DATATELCOMMUNICATIONS PAYMENT SERVICE HARBORCARSTARPHEN 7/11/2022 131.97 HOMEDEPOT.COM HARBOR MAINTENANCE SUPPLIES HARBORCARSTARPHEN 7/13/2022 57.35 CHEfS HARDWARE HARBOR MAINTENANCE SUPPLIES HARBOR BAKER 8/5/2022 560.00 CALACT MEMBERSHIP FINANCEBAKER 8/8/2022 560.00 CALACT MEMBERSHIP FINANCEDW HART 7/18/2022 15.97 VONS DAY CAMP SUPPLIES RECREATIONDW HART 7/20/2022 396.18 CHEIS HARDWARE SKATE PARK MAINTENANCE RECREATIONDW HART 7/21/2022 19.78 CHErS HARDWARE MAINTENANCE SUPPLIES RECREATIONDW HART 7/21/2022 18.12 VONS DAY CAMP SUPPLIES RECREATIONOW HART 7/22/2022 9.89 CHEIS HARDWARE MAINTENANCE SUPPLIES RECREATION DW HART 7/23/2022 42.01 VONS SKATE PARK MAINTENANCE RECREATIONDW HART 7/27/2022 67.23 VONS DAY CAMP SUPPLIES RECREATIONOW HART 7/27/2022 27541 HOMEDEPOT.COM PARK MAINTENANCE SUPPLIES RECREATION OW HART 7/28/2022 38.51 VONS DAY CAMP SUPPLIES RECREATIONOW HART 7/28/2022 12.38 VONS DAY CAMP SUPPLIES RECREATIONDW HART 7/28/2022 11.45 VONS DAY CAMP SUPPLIES RECREATION OW HART 7/29/2022 21.43 VONS DAY CAMP SUPPLIES RECREATION DW HART 8/1/2022 26.00 VONS DAY CAMP SUPPLIES RECREATION OW HART 8/1/2022 329.98 OTC BRANDS FISHING DERBY SUPPLIES RECREATION DW HART 8/3/2022 14.28 CHEfS HARDWARE MAINTENANCE SUPPLIES RECREATIONDW HART 8/4/2022 8.95 USPS FREIGHT RECREATION DW HART 8/4/2022 14.60 VONS PRIME TIMERS SUPPLIES RECREATIONDW HART 8/4/2022 51.96 VONS FISHING DERBY SUPPLIES RECREATIONDW HART 8/4/2022 83.50 CATALINA EXPRESS TRAVEL - DAY CAMP RECREATIONDW HART 8/5/2022 29.68 AVALON FREIGHT SERVICES FREIGHT RECREATIONOW HART 8/8/2022 19.64 VONS DAY CAMP SUPPLIES RECREATIONDW HART 8/8/2022 20.96 VONS DAY CAMP SUPPLIES RECREATIONDW HART 8/8/2022 45.16 HOMEDEPOT.COM PARK MAINTENANCE SUPPLIES RECREATIONDW HART 8/10/2022 5.99 VONS DAY CAMP SUPPLIES RECREATIONDW HART 8/15/2022 65.70 VONS DAY CAMP SUPPLIES RECREATION

Page 1 of 2 ends

CITY OF AVALON
US BANK CREDIT CARD CHARGES PAID SEPTEMBER 2,2022
September 20, 2022
VENDOR

JOES RENT-A-BOATSMA RTS IC N - CO M

CHETS HARDWARE

CHEIS HARDWARECHEPS HARDWARE

FILM LOGIC
CHET’S HARDWARECHET’S HARDWARE
ST. GEORGE LOGISTICSCHET’S HARDWARECHET’S HARDWARE

PEBBLY BEACH BUILDING SUPPLYPEBBLY BEACH BUILDING SUPPLYPEBBLY BEACH BUILDING SUPPLYFOTRONIC CORPORATION SWRCB
HARRY’S MARINE SERVICE
CHET5 HARDWARECHEFS HARDWARE

PUMP PRODUCTS

CHETS HARDWARE
CHET’S HARDWARECHEFS HARDWARE

PEBBLY BEACH BUILDING SUPPLY

FILM LOGIC

DESCRIPTION

FISHING DERBY SUPPLIESSTREET SIGNSGARAGE SUPPLIES

PLUMBING SUPPLIESHARBOR MAINTENANCE SUPPLIES

CUSTOMS FREIGHT
HARBOR MANTENANCE SUPPLIESHARBOR MA’NTENANCE SUPPLIES

MLLLING MACHINEMAINTENANCE SUPPLIES

OFFICE SUPPLIESWWTP MAINTENANCE SUPPLIESWWTP MAINTENANCE SUPPLIESWWTP MAINTENANCE SUPPLIESSEWER MAINTENANCE

APPLICATION FEES

PATROL BOAT MAINTENANCE

WWTP MAINTFNANCE SUPPLIESSTREET MAINTNANCE

FREIGHTPUMPS FORJMFRESTROOM MAINTENANCE

RESTROOM MAINTENANCERESTROOM MAINTENANCERESTROOM MAINTENANCE

CUSTOMS FREIGHT

DEPARTMENTRECREATIONPUBLIC WORKS

PUBLIC WORKSPUBLIC WORKSPUBLIC WORKS

PUBLIC WORKSPUBLIC WORKSPUBLIC WORKSPUBLIC WORKSPUBLIC WORKS

PUBLIC WORKSPUBLIC WORKSPUBLIC WORKSPUBLIC WORKSPUBLIC WORKS

PUBLIC WORKS

PUBLIC WORKS

PUBLIC WORKSPUBLIC WORKS

PUBLIC WORKSPUBLIC WORKSPUBLIC WORKSPUBLIC WORKSPUBLIC WORKS

PUBLIC WORKSPUBLIC WORKS
20,035.74 CHECK 34854
LAST NAME POST DATE AMT USDDW HART 8/15/2022 2000HMIELAK 7/18/2022 14711 HMIELAK 7/18/2022 59.22HMIELAK 7/15/2022 17.55HMIELAK 7/18/2022 2196 FMIELAK 7/19/2022 997.23HMIELAK 7/19/2022 2364
HMIELAK 7/19/2022 14.07HMIELAK 7/25/2022 296.62HMIELAK 7/25/2022 8485HMIELAK 7/25/2022 7.47HMIELAK 7/25/2022 270.62 HMIELAK 7/26/2022 40.31HMIELAK 7/26/2022 122.11
HMIELAK 7/22/2022 439.96HMIELAK 7/28/2022 2472.59
HMIELAK 7/19/2022 1,425.65HMIELAK 8/1/2022 10.08HMIELAK 7/28/2022 10.77HMIELAK 8/1/2022 25.12HMIELAK 8/4/2022 3,954.91 HMIELAK 8/3/2022 66.65HMIELAK 8/3/2022 80.70HMIELAK 8/4/2022 49.49HMIELAK 8/4/2022 39.48HMIELAK 8/2/2022 305.19 UPS

Page 2 of 2 ends

CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 AGENDA ITEM:

ORIGINATING DEP: Finance CITY MANAGER:

PREPARED BY: Matthew Baker, Finance Director
SUBJECT: Fiscal Year 2021-2022 Fourth Quarter Treasurer’s Report RECOMMENDED ACTION(S): Adopt the resolution accepting the FY21-22 Fourth Quarter Treasurer’s Report.

REPORT SUMMARY: State and Municipal Codes require the Treasurer to submit within30 days following each fiscal quarter a report summarizing the City’s cash and investment balances. Attached is the Fourth Quarter Treasurer’s Report for FY21-22.

The purpose of the report is to inform on a quarterly basis, the City’s cash and investment balances, the investment types, yields, and market values, and to ensure you that the City’s investments are in compliance with the City’s adopted Investment Policy.

The report shows that all of the City’s funds are in compliance with its investment policy. Ingeneral, operating cash is held in US Bank checking accounts and the excess cash is invested in California’s Local Agency Investment Fund (LAIF), less than 0.86% interest, and various certificates of deposit (CDs), earning around 1.89% interest, as of June 30, 2022.

The unrestricted cash balance for the fourth quarter of 2021-2022 totaled $15.27 million. The unrestricted cash balance for the same quarter in the prior year was $8.41 million, whichincluded cash for enterprise funds (e.g. Sewer, Saltwater, and Solid Waste) not available for general government functions. The increase in unrestricted cash can be attributed to unprecedented growth in visitor-driven revenues over the past twelve months, significantly exceeding pre-COVID figures, as well as from savings realized by maintaining many of the cost saving measures implemented in response to the pandemic.

The cash balance in restricted accounts as of June 30, 2022 totaled $11.03 million, a decrease of $143 thousand compared to the quarter ended June 30, 2021. The decrease is primarily attributable to decreases in the market value in trust accounts.GOAL ALIGNMENT: Required disclosures.

FISCAL IMPACTS: None
ADVERTISING, NOTICE AND PUBLIC CONTACT: Pursuant to the Brown Act.

ATTACHMENTS:

1. FY22-23 Fourth Quarter Treasurer’s Report

2. CD Investment Report

3. Resolution to Accept the Report

CITY OF AVALON

QUARTERLY TREASURERS REPORT
FOURTH QUARI ER ENOEDJUNE 30.1022
NAME OF ISSUERJT\PE OF INVESTMENT BANK BALANCE On Islandin g Checks Deposils In Transit BALANCE ANNUAl,
YIELD
SIARK El
IATIJRIT VALIjE

UNRESTRICTED CASII AND INVESTMENTS
US BANK ‘GENERAL CI4ECKTNO ACCOUNTUS BANK - PAYROLL ACCOUNTUS RANK - FlEX BENEFITS ACCOUNTEEr[Y CAShPROEQUITIES - VARIOUS CERTIFICATES OF’ DEPOSITS (ALL CDS ARE FDIC INSURED)MULTI-BANK SECURITIES - VARIOUS CERTIFICATES OF DEPOSITS(ALL CDS ARE FDIC INSURED) LAIF
- OENERAL ACCOUNT
)CA LOCAL. AGENCY INVESTMENT FUNGI

TOTAL UNRESTRJCTEDCASII AND INVESTMENTS
RESTRICTED ACCOUNTS:

US BANK - FLEX BENEFITS ACCOUNTUS BANK - HOUSING AUThORITY

LOW MODERATE INCOME HOUSING)
LAIF - hOUSING AUTHORITY
US BANK -SUCCESSOR AGENCY TO ACIALAIF SUCCESSOR AGENCY [0 ACIAUS BANK AS TRUSTEE) - SUCCESSOR AGENCY21013 REFUNDING BONDS DEBT SERVICE - SERIES A20)5 REFUNDING BONDS DEBT SERVICE -SERIES A & BNORTHERN TRUST CALRECYCLECALFERS CERBT TRUST

TOTAL RESTRCITED ACCOUNTS

TOTAL BALANCE OF ALL ACCOUNTS
9,264.54 11.00% Ga deaaand
30900 0)10% OTt demand

4.B2 I .468,11 It 06% On demand 4.759.393 71
513,782.23 01)11% On demand 513.70725
23,465.35 II 86% On demand 13.103 24
Uiidot he prostniott of S ocelot 53646 of ihe California Gonernnten I Code. lie Treasurer or Chief Etseal GOiter shal I renderare pout Ia Ihe Ct” Coanca t and Cils ‘I anagcr. at Irosl qia atterl’, detailing,,, fonnaoenonailsecssril,es.inventmrnE and motels of lie Cdv Ilie Ci Iv a able is nieei 0 anitcapa od espendttnro reqniromcnB for the toils,’ mnnihs I tin qllarte 5’ report cotoplies niiihi lie torte> I tilt esttltent Polio> adopled h’ the Ct> Council on lut21)21 Date
S t .732.491 85
2123.05391

9.2 ft 4 5 4
SOft OIl
1111.256 17)
$671031 411
t6.OlLt I S I .727.2474ia
603.44 137.367,94
01)0% Dat demand0461% Ott demand
S 1.727.247.49
237.76794
:t.2(cI. 54
51ta49)
9)0.50914

1.151,413 nO
Ga, demand 10929.63787
S I 5.274.957,67
SO) 0,309 94 - - 9)8,509.94 t 89’,
SI .4>14 Li 09 - - 1.452,4 13.89 I
I 1.072.203 91 - - I I .071.203.91 0 96%
S 15.178,438,04 S 13.417,507,71
34,2364(8 — - 34,236,08 0485% Oa demand 34,236 116
1481,21192 - - l,181,21I,92 1100% Ga demand 1,164,211.97

4.021.46817 - - 513,70775 - -
73,40,575 . - 33.6611 in) - 33.660,09 II 010,, On drmand 33,6661 18) 1,560.17182 - 1.560.111,82 O1XP’/n On demond 1560.171.82 5163 5,786.45 — - 2.635.796,48 2,635.7% 45
5706,574 42 - - 286,334.41 206,334.42
S I 1.090,1 26.41 S 11,090.1 26,4) 5 1,027.749,90S 26.568,564,45 S 26.507.034,12 S 26.302.707.57 Dies Olsen - TrensnreeMaitRe” BAker- Finance Dirceloe Date NASa Of ISSrEwflPt Of INSESTTE9T
LNRESTIIICTEO LRSH .t’W INVESTMENTS
US BASK. GESFRALCHECKINO ACCOUNT
US BANK. PAYROLL ACCOI4T
US RANK. FLEX BENEFITS ACCOUNT

PETTY CASH
PROQUI1 WE. VART3ILS CERTIFCA ITS 09 IPDSST5(ALL (OS ASS EDIC INSUREO2 MULTI-BANK SECURITIES. VARIOUS CERTIFICATES OF DEPOSIT
ALL CDS APE EDIC INSURED:

LAW.OENERAL ACCOLSI
CALOCALAOENCY INVLS4MENT FUNDI
TOTAL I’SRESTRICTEIS CASH A.NI) T.’ESTSIENTS S
RESTRICTEDACCOE’NTS

US BANK FLEX BESEFIES ACCOUNT

US BANK HOUSING AIJTER)RITV
(LOW MODERATE INCOME lOUSING’
LAW - HOUSING 6UTHOIITI
5 BANK - SLCCESSDR AGENCY TO AUA

LAW -SUCCESSOR AGENCY TOACLAUS BANK AS TRLSTEE( - SUCCESSOR AGENCY 5 REEL NOINU WINDS DEBT SERVICE SERIES A191$ REFUNDING BONDS DEBT SERVICE - SERIESA & H NORTHERN TRUST CAI.RECYCI.E

AL PT RE CE ROT TRUS T
TOTAL R€STRCITED ACCOUNTS
TOTAL BAlANCE OFALI. ACCOS STS
- 35644.00
• 1.364.171.11
• 7,&TS796 4!
206334.41
3 11.0*0. T26.1 I
S 16.501.634.12
Cndathc ‘:,oEcSocI” ‘3545.-II2Wr16&gfltG,.’flWW51 C-dc tAo Tsasscr .ICE.oIF,scaIOlI9cortIoihcw.Ictd cscl Es Un ( :ioocI.o,d E. SOaafln.9 Itas.q’jo’atv.dcwTt :nIn200nc. ill..s,.3.,c.,sJ.o3 incroy. .1 lx Coy T&Ci05 :akV in rwtnO Ill a95v44& Opan.kSnc lcnlTlcflI1 (or lx- two no momos FE. i,nel. cncompha *95 the cooo,l Iinncmeni Po2cy odoised 6 LMC:ryCouncIopJoI1 P 20:-I Ole, 002<0- Irca,u:ct
MtWOaa.ZSD,rflr

CIT DIASALON
Q1.4RIERL\ TREASR’RERS REPORT
rot RTEI QUARTER ENDED JUNE .IBIS
.&NNC1AL MIRKET
RA.NK BALANCE OulIlloillo Chtcks Dr..lls I. TnIrEl VALANCE IFLO .IATERJTV VALT-r I 733 1I 85 .9 I :s I: SR ST TAT S (727,147.49 0.00. Co dan,,id S .727.24)49 1933039 ,3bS94T, 6044 037367.94 00)’. OndnSI 233.16 94
9,26134 . - 93.54 O0). Or. Jc,taEJ 9 164 ‘4
coy,.
- $51300 OlIN. O.dmrw,d c0000
$9!S’OOQI - 916.30994 11*’. 2-4o,ss 9ITSY)94
SI 43741.139 . — .494,1049 I I9, 0-4ars
I .071.2:191 -
- I I.0M303 91 Ole.

I3,4fl.43I.44 5 P3,4 INS•j.’I
I :03 2 649
Co demo-4 0929650 0
I 15.374.9$7.67 -
34,236.00 000’. On ,jnnasd 45’5605
•,lBI,2II 92 OlIN. Ondcq.a,d I.ITI.N I 42

43.13625
I 131 2114:
4511 ‘I! U
234652$
35660
I 6O.I

12.63$ 964
5236 .334 42
R II,0993T6.41
S 26,964364.49
1$2TA65.T2
313.71119

73.463.15
0 56’ • On dnt4
OlIN. 000euM

0.36’. On
00cr. O,Sernmd
900’. Dodenar.3
4, 5’4 ‘IF — I
91633330
16674

34.360
.590 II 82
2,333 6E 4>
266 334 42
S I T,027.349.90
S 24,102.10752
04:3
Report Date: 6/30/2022
City of Avalon Certificate of Deposit Investments
- Annual Interest Pmt Next Coupon Maturity Days to Dealer Settled Principal Rate - Cusip 4 Bank Name Yield Schedule Payment Date Maturity ProEqty 04/13/2021 248,000 100% 2,480 Quarterly 04/13/2022 04/13/2026 1,383 05600XCP3 BMO Harris Bank ProEqty 04/14/2021 247,000 D.950/D 2,347 Monthly 04/06/2022 04/14/2026 1,384 066519QV4 BankUnited ProEqty 07/14/2021 249,000 055% 1,370 Semi-Annl 7/14/2022 7/15/2024 746 79545D7B5 Sallie Mae Bank ProEqty 12/10/2021 248,000 1.10% 2,728 Semi-Annl 6/10/2022 12/10/2025 1,259 856285ZL8 State Bank of India MBS 04/25/2019 246,000 2.74% 6,740 Semi-AnnI 04/25/2022 04/25/2024 665 61760AZK8 Morgan Stanley MBS 04/14/2022 246,000 2.74% 6,740 Semi-AnnI 10/14/2022 04/14/2027 1,749 87165FK45 Synchrony Bank MBS 04/28/2022 246,000 2.55% 6,273 Semi-Anril 10/28/2022 04/29/2024 669 02007GQE6 Ally Bank MRS 04/29/2022 246,000 2.83% 6,962 Monthly 7/1/2022 4/29/2027 1,764 39573LDE5 Greenstate CR UN MRS 05/04/2022 246,000 2.60% 6,396 Semi-Arinl 11/4/2022 5/6/2024 676 38149M6J7 Goldman Sachs Bank MRS 05/10/2022 246,000 1.85% 4,551 Maturity 5/20/2023 5/10/2023 314 35633MBJ0 Freedom Bank of Virginia Subtotal $ 2,468,000 $ 46,587
Weighted
Average 1.89% 1,061
ProEqty Cash 13 Pershing LLC Bank of NY Mellon
MRS Cash 634 Pershing LLC Bank of NY Mellon
Total $ 2,468,647
All of the Certificate of Deposits listed above are FDIC insured up to $250,000 each.

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF AVALON/SUCCESSOR AGENCY TO THE AVALON

COMMUNITY IMPROVEMENT AGENCY ADOPTING
THE TREASURER’S INVESTMENT REPORT FOR
FISCAL YEAR 2021/2022 FOURTH QUARTER
The City Council of the City of Avalon/Successor Agency does determine, find and resolve as follows:

Section 1. The Fiscal Year 2021-2022 Fourth Quarter Treasurer’s Report is hereby adopted and approved.

PASSED, APPROVED AND ADOPTED this 20th day of September, 2022.

Ann Marshall -Mayor
ATTEST:Gabrielle Morones, Deputy City Clerk

CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 AGENDA ITEM:

ORIGINATING DEP: Finance CITY MANAGER: L2kZIJ
PREPARED BY: Matthew Baker, Finance Director
SUBJECT: Amendments to Fiscal Year 2022-2023 Miscellaneous Fee Schedule RECOMMENDED ACTION(S): 1 Hear a presentation regarding amendments to theMiscellaneous Fee Schedule. 2. Open the Public Hearing to hear public comments. 3. Close thePublic Hearing. 4. If consensus, adopt the fee schedule as amended.

REPORT SUMMARY: On June 8, 2022, the City Council conducted a public hearing and adopted the Fiscal Year 2022-2023 Miscellaneous Fee Schedule. The City charges fees for miscellaneous public services, facility use/rental and activities. User fees are assessed and collected for City services and programs provided by various departments including:
• Recreation programs and facilities• Planning & building (reviews, inspections, variances, etc.)• Fire, Law Enforcement, Code Enforcement• Harbor operations and activities• Cemetery• Finance/Administrative Services• Public Works These are services that convey a benefit, grant a privilege, provide for review and enforcement of regulatory activities, enforce laws or are a condition of development. Under State law, cities may charge fees to recoup the direct and indirect costs related to the provision of user services.

Since its adoption, City Staff have identified new services and fees to be added to the schedule as well as typographical errors that need to be corrected from the previously adopted schedule.

In addition, Staff reorganized the fee schedule and enhanced descriptions to clarify the nature of certain fees.The following fees are new to the fee schedule:
• Outdoor Dining Permits• Noise Violation• Chair and Table Rentals• Basketball and Volleyball Court Rentals Staff have identified other areas of the fee schedule to be updated including the vehicle permit fees, transient rental licensing fee, and film permit fees. These fees require a more comprehensive analysis and will be addressed in a future fee schedule amendment. In addition,a notice of the public hearing was published in accordance with the applicable law.

GOAL ALIGNMENT: City costs will be offset by annual revenues.

FISCAL IMPACTS: Staff estimates that the new City fees, if adopted as proposed, should generate $5,000 in the General Fund and $15,000 in Harbor Fund revenues.CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: The costs of specialservices will not be fully funded by fees paid by the users of those services. The unfundedportion of user services will be subsidized by General City tax revenues and/or available fundbalances.FOLLOW UP ACTION: Adopt the attached resolution establishing city rates and fees for services.

ADVERTISING, NOTICE AND PUBLIC CONTACT: Pursuant to the Brown Act.ATTACHMENTS:
• Resolution• Exhibit A — Proposed Amended Miscellaneous Fee Schedule FY22-23 RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF AVALON AMENDING FEES FOR SERVICES, FACILITIES
AND ACTIVITIES OF THE CITY OF AVALON FOR FISCAL YEAR 2022-23 WHEREAS, Pursuant to a Public Hearing held on June 8, 2022, the City Council considered the recommendations of Staff regarding the appropriate fees for permits, approvals, services, activities and other user services; and
WHEREAS, during a Public Hearing held on September 20, 2022, the City Council considered amendments to the Fiscal Year 2022-23 Miscellaneous Fee Schedule; and WHEREAS, state law allows cities and other local government agencies to recoup the full cost of user services; and
WHEREAS, the Avalon Municipal Code provides that all of the fees, charges and costs listed in “Exhibit A” attached hereto and incorporated by this reference shall be set by resolution of the City Council; and
WHEREAS, the fees, charges and costs listed in Exhibit A” have been available for public inspection for at least 10 days;
NOW, THEREFORE, the City Council of the City of Avalon, State of California, does determine, find and resolve as follows:

Section 1: The City Council hereby finds that the fees set forth in “Exhibit A” Miscellaneous Fee Schedule Fiscal Year 2022-23 represent a reasonable estimate of the cost of providing the services, activities and/or facilities for which fees are charged.

Section 2: The City Council hereby adopts the fees for City services, activities and/or facilities as set forth in “Exhibit A” attached hereto and made a part hereof, which shall be effective October 1, 2022.

PASSED, APPROVED AND ADOPTED by the City of Avalon, State of California this 20th day of September, 2022, by the following vote:

AYES:

NOES:

ABSENT:ABSTAIN:

Ann H. Marshall, Mayor
ATTEST:

Gabrielle Morones, Deputy City Clerk
Fee Schedule Fiscal
2022-2023 (Revised)
PROPOSED SEPTEMBER 20, 2022
City of Ava Ion
Year
Table of Contents
Section Department Page
I Administration I
II Cemetery 2
III Finance 3
IV Fire 4
V Harbor 5VI Law Enforcement 7VII Planning 8
VIII Public Works 17
IX Avalon Transit 18
X Use of Manpower and Equipment 18XI Community Services 19

MISCELLANEOUS FEE OR SERVICE
SECTION I -ADMINISTRATION UNIT FY23Rental of City Hall
City Council Chambers/Conference Room Per day 186Cleaning & Key Deposit Each 247Government and Civic Groups Per day Free with Approval Administrative Permits
Outdoor Dining (October - April) Per day 80Outdoor Dining (May - September) Per month 1600Bicycle License/Replacement Each ISLegal and Professional Fees Cost t 20% Late Payment Fee (urless stated elsewhere) Each 10% (mm $25)Late Payment Irterest on Past Due Balance Monthly 0.50% Transporlatior Permit Each 262
Encroachn-.ert Permit Each 262
Newspaper Rack Permit Eacn 262
Appeal to Heahng Officer Each 262Aopeal to City Courcil Each 438 Vehicle Permits
Residential Autoetle Each 37Residentia! Vehcle Each 37
Commercial Autoette App. (Hearing)
App. Hearing Each 76Autoette Renewal Each 37
Commercial Vehicle App.(Hoaring)
App. Hearing Each 76vehicle Renewal Each 37
Ncr Emergent Public Service Permi Each 37
Oversized Autoette App.(Hearing)
App. Hewing Each 76Autoette Renewal Each 37
Oversized Vehicle App.(Hearing)
App. Hearing Each 76Vehicle Renewal Each 37On Service Call Placard (Annual Permit) Each 23 Interior Vehicle Each 37
Duplicate Hearing Notice Each 85Hearing Officer Appeal Each 263City Council Appeal Each 439Daily Temporary Permit Each 34Monthly Temporary Permit Each 352Permit Late Fee Each 30 Film Location Permit
Application Fee Each 27Ten or fewer employees Each 254More than ten employees Each 340 Still Photography Permit Day 118

MISCELLANEOUS FEE OR SERVICE
SECTION II - CEMETERY UNIT FY23Single Ground Burial
P: Each 1191Maintenance Each 216Opert/Close Grave Each 868 Vault Each 956
Ground Memorial
Each CosttlO% (including_Processing_Fee)
Marker Placement Each 198
Ground Vase Each 19
Double Ground Burial
Plot-Double Deep Each 1728Maintenance Each 437
Vault Each 956Ground Memorial Cost-’-lO% Each (including Processing Fee) (wI $800 Deposit) Name Scrolls for Ground Memorial Each Cost+I0% (including_Processing_Fee) Date Scroll for Ground Memorial Each Cosl+i0% (including_Processing_Fee) Maer Placement Each 198
Burial of Cremated Remains
112 Pot Each 595
Maintenance-LIFETIME Each 113
Open/Close Grave Each 267GroLnc Memorial Cost+10% Each incuding Processing Fee) (wI $800 Deposit) Ma-ker Placement Each 198
Cremated Remains in Niche Wall
Niche Each 650Placement of Remains in Niche Each 83
Small Niche Vase Each CostSingle Niche Plaque Each 10% of Cost (including_Processing_Fee) Double Niche Plaque Each 10% of Cost (including_Processing_Fee) Installation of Plaque Each 77
Scroll for Companion Plaque Each 10% of Cost (including_Processing_Fee) Memorial for Cremated (Scattered) Remains
Memorial Wall Reservation Each 214
Memorial Vial Plaque Each Cost+10% (irclud_ng_Processing_Fee)Insta la:ion of Placue Each 71 Small Burial Vault Each 184
2 MISCELLANEOUS FEE OR SERVICE
SECTION III - FINANCEBusiness License Program Collection FeeTOTAL Business License Collection Fee Each 41Bus. License. Collection Fee is set by resolution. Sec. 3-1.112 of the Municipal Code and is the fee for processing the Business License TaxPer SB1186 $1 ($4 through 12131/2023) for Division of State Architect (DSA) for Certified Access Specialist Each 4
Business License Tax is on pg 3.109 Sec. 3-1.202 of the Municipal Code and can only be changed by an ordinance
Fats, Oils and Grease
Fats, Di s and Grease Permit Fee Eaci 390lispection Fee Eacn 113Re-tnspection Fee Each 171 Replacement FOG Binder Each 61
Reolacement Best Management Practice Pos:er Each 19
Returned Check
Returned Check Each 30
Each Retur’-ed Check after fi’st offense Each 42
Commuter Card Replacement
Commuter Card Replacement Each 13
Dog License
Neutered Each 34Unneutered Each 68DupIcate Tag Eac’, 1
Late Fee Each 34
Other Fees
Copy Fee Each 0.12Laminaton Fee Each 2

MISCELLANEOUS FEE OR SERVICE
SECTION IV- FIRE UNIT FY23Per LA County Emergency Medical Services Agency Rate Schedule Ambulance Service (ALS) Non Emergency Each 2532Ambulance Service (ALS) Emergency Each 2710 Ambulance Service (BLS) Non Emergency Each 1687Ambulance Service (OLS) Emergency Each 1809 Mileage Rate Per Mile 23
Oxygen Service Each 108
Copy of Report Fire/Ambulance Each 44False Alarm
1st None
2nd 433rd 172
Weed Abatement
Weed Abatement (incuding Processing Fee) Each Cost + 20% Plan Check
Hoods Per Plan Check 597
Spr.nkler Pe Plan Check 597
Aarm Per Plan Check 597
Fire Per Plan Check 296Occupancy Cacutation Per Plan Check 150Hydrant F’ow Check Per Plan Check 139 Automatic Dialer Alarm System
Sig”up Eacn 214
Renewal Each 310
Hazardous Material Clean Up
Hazardous Material Clean Up
. Each Cost + 20% (nckcirg_Processing_Fee)
Hazardous Inspections Each 147
Low Each 147Ordinary Each 147
High Each 289Special Each 289Reinspection Each 289

MISCELLANEOUS FEE OR SERVICE
SECTION V- HARBOR UNIT FY23
Credit Card Processing Fee Each 3.99%Hoist Each 33Harbor Spills (incuding Processing Fee) Each Cost + 20%Harbor Discharge Appeal Each 462 Towing Fee Each 86Waterside Application Fee Each 275Waterside Application Deposit 1st Installment Due 4/1 500
2nd Installment Due 8/1 500
Haul Out Fee 75Storage Fee - Per Week Per week 33
Mooring Service Charge (Mooring Rates -Daily Use)
Dinghy Dock Daily Free30 and under Daily 4431 to 39’ Daily 48 40’ to 49’ Daily 6150’ to 59’ Daily 7460’ to 69’ Daily 97 70’ to 79’ Daily 120
80’ to 89’ Daily 13490’ to 99’ Daily 160
100’ or more Daily 180
Special SpringlFall rate:
. . Pay 4 nights consecutive Spnng - Palm Sunday thru June 15th Nights and get the next 3 free Fal’ - Sept 15th thru Oct 14th Special Winter rate: Ni hts Pay 2 nights consecutive October 1 5th thru Palm Sunday g and getthe next 5 freeHospital Measure H - Nightly Mooring Charge Daily 1 4 Hour Rate Each 112 of over night fee
30’ and under Each 2231’to39’ Each 24
40’ to 49’ Each 31
50’ to 59’ Each 37
60’ to 69’ Each 49
70’ to 79’ Each 60
80’ to 89’ Each 6790’ to 99’ Each 80
100’ or more Each 90

MISCELLANEOUS FEE OR SERVICE
SECTION V - HARBOR UNIT FY23Annual Lease Fees
30’ Annually 1,661
40 & 45’ Annually 2,22250’ Annually 3,33260’ and above Annually 3,998 Annual Mooring Permit (cost/ft/month) Annually 105
Plus maintenance, chain and taxes
Water Dock Coin Operation for Fresh Water Cost
Harbor Use Fees and WharfageHarbor Businesses 7% gross receiptsFishing Tournament, Per Boat .
, 4% gross receipts (Charitable Exemption)
Per Passenger Wharfage - Cross Channel Carners 3.00 Each Way Wharfage - Cruise Ships (100% of landed passengers) Per Passenger 5.00 Wharfage - Hospital Measure H Per Passenger 0 50 (Increases to $1.00 effective April 1, 2023) Arriving - Shoreboat Fee Per Passenger 7.00

MISCELLANEOUS FEE OR SERVICE
SECTION VI- LAW ENFORCEMENT UNIT FY23
Animal Control Each 27
Animat Round Up Each 43Animal Boarding Each 43Vehicle Impound Each 185 Outdcor Restaurant Review Each 262Bicycle-Daily Storage Daily 2 Fines:

Fix It Ticket Each 27Noise Violation (Second Offense) Each 500Noise Violation (Third Offense) Each 1000 Obedience to Traffic Device Each 51
Parking on Private Properly Each 51
Curb Marking Each 51Loading Zone Each SICommercial Overnight Parking Each 88 Fire Lane Each 88
Fire Hydrant Each 88
18 from Curb Each 51
Disabled Parking Each 448

MISCELLANEOUS FEE OR SERVICE
SECTION VII- PLANNING UNIT FY23
Public Noticing Each 262Tentative Parcel/Tract Map Each 1,755 Tentative Tract Map Each 1,755
Final Tract Map
Final Tract Map Deposit Each 4,394Final Tract Map - Engineer Review Each COST + 20% ( including_Processing_Fee)Final Parcel Map Deposit Each 4,394Final Parcel Map Each COST + 20% ( including_Processing_Fee)Final Parcel Map -Engineer Review Each COST + 20% (including_Processing_Fee)Lot Line Adjustment Each 764 Conditional Use Permit (CUP)
Condo Conversion Each 2,633Bonus Density Each 2,633
All Others Each 1,755
Conditional Use Permit (Transient Rental License)(CUP/$1755, COP/SI 113, Public Notice/$262. CEQA/$491) Each 3,621 Home Occupancy Review Each 177
Variance
Lessthan2s% Each 581
Greater than 25% Each 1,163Coastal Development Permit (CDP) Each 1,113 Zone
Zone Change Each 4,387Zone Change. Local Coastal Permit (LCP) Each 8,774Zoning Confirmation letter Each 214 Sign
Temporary Sign Permit Each 89Business Corner Sign Permit Each 315Sign Permit Each 274Sign Variance Each 438 Fees for Additional Processing Needed:

General Plan Amendment Each 2,195General Plan Deposit Each 12,556General Plan Consultant Preparation Each COST+20% (including_Processing_Fee)General Plan City Attorney Review Each COST+20% (including_Processing_Fee) Appeal to Planning Commission
Appeal to Planning Commission Fee j Each 877 Development Agreement Development Agreement Deposit Each 12,556Development Agreement Attorney Review Each COST+20% (including_Processing_Fee) 8 MISCELLANEOUS FEE OR SERVICE
SECTION VII - PLANNING (Continued) UNIT FY23
CEQA
Categorical Exemption Each 491Mitigation Negative Declaration Each 876Dectaration Deposit Each 3.138 Consuttant Preparation (including Processing Fee) Each COST+20% Attorney Review (including Processing Fee) Each COST+20%Attorney Preparing/Filing (including Processing Fee) Each COST-’-20% Mitigation Monitoring (including Processing Fee) Each HOURLY COST+20% EIR
EIR Deposit Each 12,386
Consultant (including Processing Fee) Each COST+20%Attorney Review (including Processing Fee) Each COST+20%Attorney PreparinglPiling (including Processing Fee) Each COST20%Attorney Review/ Approval - CC&Rs Each COSTi-20% (including_Processing_Fee) Extension-6 Month Each 174
Compliance Certificate Each 403
Administrative Permit Each 433Accessory Dwelling Unit Permit Each 433 Preliminary Review Fee Each 287
Temporary Use Permit (NEW- FY21) Each 390Site Plan <25% of building Each 1,163Site Plan > 25% Each 2.325 9 MISCELLANEOUS FEE OR SERVICE
SECTION VII - PLANNING (Continued) UNIT FY23Building Permits Issuance Fee Each 42
Valuation $0 to $700 Each 57
Valuation $700 to $25,000 Each 86
Plus for each additional $1000 or fraction above $1,000 Each 23 Valuation $25,001 to $50,000 Each BIB
Plus for each additional $1,000 or fraction above $25,000 Each 17 Valuation $50,001 to $100,000 Each 1050
Plus, for each addittonal $1,000 or fraction above $50,000 Each IS Valuation $IDD.00 to $250,000 Each 1,688
Plus’ ‘Cr ea.:b addil:onal $1000 or faction abo.s $100.0% Each 7 Va uation $250,001 to $500,000 Each 2,590
Plus’ cr eace acd o.nal $1,000o’ f’aolui above S25iD.0C Each 7 Va ua:io’, $500,001 and ove- Each 3,937
P us. to’ each add tonal 5’ 009 or fraci cn above $500.090 Each 6 Work within Archeological Sensitive Areas (ASA) - See Archeological Monitoring Fees (Page 13) Baseo on construct on
Strong Motor lnstrjmenta:ion & Seism;c Maooing (SMIP) Fee valuatio’ + 5% Collected on behalf of the Dept. of Conservation Administation Fee to C :y
Based on construction
Ca fornia Bui’d.ng Standads & Commission (CBSC) Fee va’uation + 10% Collected on behalf of Calif. Building Standards Commission Administration Fee to City
10 MISCELLANEOUS FEE OR SERVICE
SECTION VII - PLANNING (Continued) UNIT FY23
. Included in regular plan Green Building Code/Plan Check Fees check.

Instrumentation Program Surcharge
Residential Each 10%Other Each 20%Minimum Each 5%Energy Conservation Surcharge Each 10%Disabled Access Surcharge Each 5% Combined Bldg/Plumbing/ElectricallMechanical (md. Pools) Each 1,5 X Building Permit Plan Check

1.5 X Building Permit Plan Check Each Fee
Standard Plans Each 106
Minimum Each 198Duplicate plan (percentage of plan check fee) Each 70%Exlension Fee (percenlage of plan check fee) Each 25% Grading Permit Fees
Issuance Fee Each 441--SO cubic yards Each 212
51 ‘-1,000 cubic yards Each 316
1 ,001--10,000 cubic yards Each 1,259
icr each additional ‘00 cuyda or fraction above 1,000 Each 89 1O,00l--l00,000 cubic yards Each 208
for each additional 100 cu.yds. or fraction above 10,000 Each 57 101,000 or more Each 7,215
for each additional 700 cuyd& or fraction above 100,000 Each 142 See Archeological Monitoring Fees for work within Archeological Sensitive Areas (ASA) Grading Plan Check Fees
Grading Plan Check (including Processing Fee) Each COST+20%Deposit 1,809 Landscape Permit Fees
2,500--7,500 square feet Each 249
7,501--15,000 square feet Each 372
15,000--30,000 square feet Each 746
30,001 square feet to 1 acre Each 911
Landscape Plan Check Fee
Landscape Plan Check (including Processing Fee) Each COST+20%Deposit 1,206 II

MISCELLANEOUS FEE OR SERVICE
SECTION VII - PLANNING (Continued) UNIT FY23
Additional Fees
Work Commencing before Permit Issuance
Per CSC 109.4 Each 2x Perm[t FeeMinimum Fee for violation Each Mm. $100Issuance for items below Each 44Miscellaneous site inspection Each 553 Occupancy Inspection (Change of Use)
Residential Each 288
Other
less than 5,000 square feet Each 7055,00l--10,000 square feet Each 850 10,001--100,000 square feet Each 1414
above 100001 square feet Each 2,141Substandard Notice Correction Inspection Each 500Demolition Permit Fee Each 215Demolition Inspection-Asbestos/Lead Each 320Group A. Division 4 Structures Each 288 Amusement Park Inspections
First structure Each 215Each additional structure Each 35 Building relocation
up to 2.500 square feet Each 571
2,501 square feet and above Each 1,142Trailer Coach Inspections Each 212 Inspection Outside Business Hours, per hour Each 129
Other inspection, per hour Each 129
Barriers for Pools Each 121Permit Copy Each 3Public Record Research (per hour) Each 40 Concept Review Approval Each 170Concrete! Material Testing (NEW FY21) Each Cost + 20% 12 MISCELLANEOUS FEE OR SERVICE
SECTION VII- PLANNING (Continued) UNIT FY23
Geotechnical Site Review
Engineering geology report Each 553
Geotechnical engineering report Each 553Combination Report Each 772 Review to determine need for report Each 553
Coastal engineering reports Each 507Parking occupant load calculation Each 143Reproduction of microfilmed plans Each 44 Assignment of house numbers Each 70
Hourly Rate to review changes Each 143Hourly Rate to review additional changes Each 143 Certificate of Occupancy
Certificate of Occupancy Issuance Each 133
Temp. Certificate of Occupancy (TCO) (90 Days) Each 199TCO Extension (30 days) Each 133 Processing 45-day notice Each 579Processing Nolice of Violalion Each 957Notice of Compliance . . . . Each 395 (Rescission_of_Notice of Violation)
Noncompliance Fee Each 265
13 MISCELLANEOUS FEE OR SERVICE
SECTION VII - PLANNING (Continued UNIT FY 23Plumbing Permit For Issuing Each Permit Each 44
In Addition
For each fixture Each 23
For each dishwasher Each 6For each drainage or sewer backwater valve Each 63Fo each sewe lateral replacement Each $36 + $1001 per LFFor eacr swimming pool drainage trap a”d receptor Each 23 5 outlets or less Each 16each outlet over 5 Each 5
Medium or hgh pressure system Eacr 18each systen Each 20each additional oullet Each 5 For each private gas meter Each 23For each privale gas pressure regulator Each 23For each waler healer and vent Each 23 For alleration of drainage/vent piping, each fixture Each 23For each waler pressure regulator Each 23 For other potable water
1-1/2 inch and smaller Each 23
2 inches to 3 inches Each 68over 3 inches Each 145
For replacing water piping, each fixture/device Each BFor sprinkling system, each backflow preventer Each 23For each backflow prevenler (unprotected water supplies) Each 23 For each trap primer Each 23For each solar heating system Each 72 Investigation fee for work without permit
R-3 occupancies Each 225All olhe’ occupanc es Each 451
Noncompliance Fee
R-3 occupancies Each 136
All other occupancies Each 270
Board of Anceals fee Each 575
Allernate malerial fee Each 293Addi:icna ho,Ay rale Per hour 145 Fats. Ous and Grease Fees -see Section IV. Finance Business License 14 MISCELLANEOUS FEE OR SERVICE
SECTION VII - PLANNING (Continued) UNIT FY23Electrical Permit Issuance Fee Each 44
New Residential building Surcharge
multifamily, per square foot addition or remodel (added) Each 0.08 single or two family, per square foot Each 0.09
For 15 or 20 ampere receptaclesFirst 10 branch circuits Each 24 Each additional branch circuit from 11 to 40 Each 20Each additional branch circuit over 40 Each 37 Receptacle, Switch, Lighting
First 20, each Each 2
Additional outlets, each Each 2
Lighting Fixtures
First 20, each Each 2
Additional fixtures, each Each 2
Pole or platform mounted, each Each 3
Theatrical lighting, each Each 3
Power apparatus
Rating over three to 10 Each 27
Rating over 10 to 50 Each 62Ratingoversotoloo Each 117Rating over 100 Each 190Busways, each 100 feet Each 35 Signs, Outline Lighting, and Marquees
signs and systems supplied from one branch, each Each SIadditional branch circuits within the same sign, each Each 17 Services, Switchboards
600 volts and 399 amperes or less Each SI600 volts and 400 to 1000 amperes Each 102600 volts and over 1,000 amperes Each 217Solar Systems (NEW FY21) Each 217 Investigation Fee, work without a permit
Minimum fee Each 451Minimum fee, one and two family, owner-builder Each 225 Noncompliance Fee
One and two unit buildings Each 136
For other occupancies Each 270
15 MISCELLANEOUS FEE OR SERVICE
SECTION VII - PLANNING (Continued) UNIT FY23Mechanical Permit Permit Issuance Each 42
Compressor/Absorption Unit/Furnace, each
Up to 100,000 BTU Each 37100,000 BTU to 500,000 BTU Each 70More than 500,000 BTU Each 174For each air inlet air outlet (air conditioning) Each 5 or, for each 1,000 square ft. Each 48
Air Conditioning Units Up to 2,000 CFM 16
eachunituptolO Each 17each unit over IC Each 4
2,000 to 10,000 CFM, each Each 50
More than 10,000 CFM, each Each 86Evaporative Cooter, each Each 29 Commerciat kitchen hood, spray booth or duct system Each 87 Fire damper Each 14
Saltwater Connection/Disconnection Fees
Connection Each 136
Disconnection Each 44
Sewer Connection Fees
Residential Per dwelling unit 1,052
Public Shower Per shower 353Hotels Per room 526
Take-Out Restaurant Each 1,578
Churches Each 2,106Bar/Restaurant (less than 100 seats) Each 3,156Bar/Restaurant (more than 100 seats) Each 4,733 FIRE PERMITS ISSUED BY PLANNINGPlan Check
Hoods Per Plan Check 597
Sprinkler Per Plan Check 597Alarm Per Plan Check 597
Fire Per Plan Check 296
16 MISCELLANEOUS FEE OR SERVICE
SECTION VIlI-PUBLIC WORKS UNIT FY23
Spilled Load (including Processing Fee) Each COST+20%Nuisance Abatement (including Processing Fee) Each COST+20% Street Sweeping (including Processing Fee) Each COST+20% Landslide Clean-up (including Processing Fee) Each COST+20%Pot Hole Repair (including Processing Fee) Each COST÷20% Waste Water Treatment Facility Dump Fee (minimum) Each COSTPer Gallon (after 600-gallon minimum fee) Gallon Public Works Permits
Excavation Permit Each 263
Excavation Deposit (mm $50) - Issuance Fee SQUARE FT 43Excavation Admiristrat:on Surcharge (non-refundable) Per Deposit 20% of DepositExcavation Pe”ay (iicLcing rccessing Fee) Each COST+20%Encroac”ment Permit Apolicaton Each 263 Obstruction Per.rn t (Daily) Each 86ObsfrucLo9 Permit (Monthly) Each 263Cuth Cu Application Eacr-, 263 Abandond Vehicte -full cosl apprx Si .000!veMce Each COST Archeological Monitoring Fees-Work within Archeological Sensitive Areas (ASA) Issuance Fee Each 44
Excavation Pern’i:: Each 263Deposit Deposit 4,221
Archeological Monitoring Services (inc. Processing Fee) Each COST.20% Deposit for 10 or more Anticipated Excavations a Year Deposit 8,441 (May or may not be in an ASA) -
17 MISCELLANEOUS FEE OR SERVICE
SECTION IX - AVALON TRANSIT UNIT FY 23FIXED ROUTE TRANSIT General Public Per Ride Per Ride 2General Public Per Pass Day 5General Public Per Pass Week 24General Public Per Pass Month 58Children Under 6 with Paying Passenger Per Ride FREELimited to a maximum of 2 children per paying passenger ACCESS
ADA Eligible Individual Per Ride Per Ride 2ADA Eligible Individual’s Personal Care Attendant Per Ride FREEADA Eligible Individual’s Companion(s) Per Ride 2Children under 6 years with an ADA Eligible Individual Per Ride FREE(Limited to a max of 2 children per paying passenger

DIAL-A-RIDE
Eligible Senior or Disabled Individual Per Ride Per Ride 2 Eligible Individual Ride to Hamilton Cove Per Ride 4Children under 6 years with an Eligible Individual Per Ride FREELimited to a maximum of 2 children per paying passenger CHARTER Cost + 20%SECTION X - USE OF MANPOWER AND EQUIPMENT UNIT FY23 Proposed The Hourly & Equipment rates are used by staff to create a composite rate for a specific service such as sewer lateral repair. Note: Rates are estimates and may be updated due to purchase of new equipment or overhead adjustments.The City charges the same equipment rental rates that are specified in the California State TransportationAgency (Caltrans). These charges are modified for Community Groups and are shown below.

In cases where a piece of equipment is not in the Caltrans book, the rate specified in the User Fee Schedule willbe used. Equipment is not available for rent or personal use.

Sewer Cleaning & InspectionsHourly Minimums required for work 4Hr Mm Maintenance- Operator Hourly 864Hr Mm Maintenance -Video Tech Hourly 864Hr Mm Maintenance- Helper Hourly 714Hr Mm Vactor Truck Hourly 1304Hr Mm Robotic CCTV -Added FY 18 Hourly 764Hr Mm Video Pipe Camera - Added FY16 Hourly 344Hr Mm City Pick Up Truck Hourly 322Hr Mm lowable Pressure Washer; Jetter Hourly 30 lHr Mm Administration Review Hourly 106
18 MISCELLANEOUS FEE OR SERVICE
SECTION X - USE OF MANPOWER AND EQUIPMENT (Continued) FY23Community Groups Firefighter/Engineer Hourly 72Harbor Patrol Officer” Hourly 72 Sheriff Deputy” Hourly Cost+20%
Public Works 6
Lead Worker Hourly 55Maintenance Worker Ill Hourly 46Maintenance Worker II Hourly 40 Maintenance Worker I Hourly 35
Overtime Hourly 1.5 x hourly rate
Call Out (2 Hour MiHmum) Hourly 1.5 x hourly rateSicewalk Street Sweeper Machine Hourly 44Waste Water Contacted Worker Hourly Cost+20%Other Personne. Hourly 1.5 x hourly rate Ambulance Hourly 34
Dump Truck Hourly 34
Fire Engine Hourly 45
Haor Patrol Boat Hourly 34Pick-Up Truck Hourly 15Rescue Boat Hourly 45 Street Sweeper I Tras’ Truck Hourly 34Other Equipment Hourly 1.5 x houry raw Jetting Program - (Private Lateral Maintenance)
Schedu ed Arnal Service Feet of Line Consists of 1 X Truck S49hr/ 2x (9Opp/tv.)Ma’n
3 worker $1801 Jet:er
Frst Time Cost $23/ HRw —100ff.
*Public safely costs for events that contr,bute more than 40% o’ net proceeds. bul not ‘ess tnan 55.000, to local charities shah be waived.
19 MISCELLANEOUS FEE OR SERVICE
SECTION X - USE OF MANPOWER AND EQUIPMENT (Continued) FY23Private Groups Firefighter/Engineer Hourly 141Harbor Patrol Officer Hourly 141 Sheriff Deputy Hourly Cost÷20%Lead Worker Hourly 118Maintenance Worker Ill Hourly 102 Maintenance Worker II Hourly 86Maintenance Worker I Hourly 71Sidewalk Street Sweeper Machire Hourly 86Wasle Waler Contracted Workw Hourly Cost+20%Other Person-el Hourly iS x hourly rate Arrbu ar’ce Hourly 56
Dump Truck Hourly 56Fire E.igine Hourly 75riaroor Patrol Boat Hourly 56 Pick-Up Truck Hourly 28Rescue Boat Hourly 75Slree: Sweeper / Trash Truck Hourly 56 etter / Pressure Wasqer Hour!y 25
Oe-er Equipment Houry 2-5 x houry rate
20 MISCELLANEOUS FEE OR SERVICE
SECTION XI - COMMUNITY SERVICES FY23
Annual Recreation Programs
Donation for Team Sports Scholarships (mm) 1
T-Ball Each 34
Basketball (youth) Each 41Flag Football Each 41
Swimming Lessons Each 8/classDay Camp (Weekly) Summer 2023 Each 78Day Camp (Daily) Summer 2023 Each 19 Youth Soccer Each 41Adult Soccer Each 85Adult Flag Football Each 39Adult Volleyball Each 39Adult Basketball Each 39 Recreation Registration Late Fee Each COST+20%
Other Recreation ProgramsRates to be eslablished and advertised by the Recreation Department through flyers and other media.Leisure )lnstruclional Classes COST+30%Festival Booth Non-Profit Orgnization (with out food preperation) Each 40Non-Profil Orgnization (with food preperation) Each 58 All Other (For Proft Entilies) Each 86
Community Service Permits
Street Performer Permit 33Sidewalk Vendor Permit 33
Digital Sign Board
Two-week Post Each 11Annual Post Each 70
Kayak and Stand Up Board Rack Rental
Six Month Each 113
Annual Each 170
Other Equipment Rental
Field lighting (two hour minimum) Hourly 40
Chair Rental (mm. 25 chairs) Each 2
Table Rental (mm. 5 tables) Each 10
Chair and Table Deposit (refundable) Each 200
Parks (subject to approval by Community Services Department) Parks Facilities Deposit See Recreation DetailCity Park Each 29Knabe Park Each 29Kid’s Park Each 29Basketball Court (2 hour maximum) Each 29Beach Volleyball Court (2 hour maximum) Each 29Buena Vista Park Not available 21 Community Services Detail FY 22-23
Group Designations for Facilty Rentals:

City of Avalon sponsored or cosponsored event or program; agencies with a reciprocat Group I facitity use and fee schedule; and governmental agencies (serving City of Avaton residents) for business meetings and programs.

Resident leagues or teisure ctasses (reoccurring weekly rentat 8+ occurrences), resident Group 2 small not-for-profit organizations (those whose budget is less than one million dollars annually)
Grou 3 Resident private use, resident large not-for-profit organizations (those whose budgel is more than one million dollars annually), Nonresident not-for-profit organizations.

Group 4 Resident commercial, business, and for-profit organizations.GroupS Nonresident commercial, business, and for-profit organizations.Explanation: Fee modifications to provide discounted rates for resident and non-protit groups that conduct special events.1) Facilities Damage & Cleaning Deposit A cleanirg anc security deposit of $200.00 is recuired for all rentals at Tremont Hall and Deposit: _MF Courtyard and a cleaning anc security deposit of 5500.00 is requ red ‘or the rental of JNC Field.

For larger rentals the amount of the deposit for cleaning and oamages may vary based onthe facility and scope of event.

The City recuires all facility renters to obtain liability insurance nam.ng the City of Avalon asacditional irsu-ec as the propery owne4lessor. The ren:er must obtain tnis on their own.

The City of Avalon wi i assst in this pmcess by providina a step-by-steo guide on how to Insurance: - . . . . — obtain the requred insurance, which will ncude a 1st of affordable insurance agencies meeting our requirements. The renter no longer pays the fee to the City of Avalon as a pass through
2) Skate Park Facility Rental Fee
Group 1 Group 2 Group 3 Group 4 Group 5
Fee: Currrent FY22 No Charge 3 61 92 124
General No Cnarge 33 64 97 130
3) Joe Machado Facility Rental FeeFull Day Rental
fMore than 4 hours) Group 1 Group 2 Group 3 Group 4 Group 5 General No Charge 76 250 312 343Courtyard Only Np Cnarge 39 124 157 172 Half Day Rental
(Up to 4 hoursi Group I Group 2 Group 3 Group 4 Group 5 Standard Fee No Charge 47 136 179 209Courtyard Only No Charge 25 71 88 104 22 Community Services Detail FY 22-23
Group Designations for Facilty Rentals:

City of Avalon sponsored or cosponsored event or program; agencies with a reciprocal Group 1 facility use and fee schedule; and governmental agencies (serving City of Avalon residents) for business meetings and programs.

Resident leagues or leisure classes (reoccurring weekly rental 8+ occurrences), resident Group 2 small not-for-profit organizations (those whose budget is less than one million dollars annually).

Grou 3 Resident private use, resident large not-for-profit organizations (those whose budget is p more than one million dollars annually), Nonresident not-for-profit organizations.Group 4 Resident commercial, business, and for-profit organizations.Group 5 Nonresident commercial, business, and for-profit organizations.

Explanation: Fee modifications to provide discounted rates for resident and non-profit groups that conduct special events. 4) Tremont Hall Facility Rental
Groupl Group2 Group3 Group4 Grouns
Fu.l Day Rental No Charge 61 125 250 312Half Day Rental No Charge 38 80 157 196 5) Special Event
Grcupl Group2 Group3 Group4 Group5
General Permit No Charge 32 53 95 125Beacn Perm No Ciarge 76 250 312 343 (Up to 4 Hours) 6) Wrigley Stage
Group I Group 2 Group 3 Group 4 Group 5
General No Charge 33 48 64 129
7) Street Banners
Group 1 Group 2 Group 3 Group 4 GroupS
General (6 Week Slot) ‘No Charge 63 99 170 250
23 CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 ADENDA ITEM:

ORIGINATING DEP: Planning CITY MANAGER: 0411.

PREPARED BY: Susanna Gutierrez, Assistant Planner
SUBJECT: General Plan Amendment GPA 22-01, approving revisions to the 2021-2029 planning cycle Housing Element Update
RECOMMENDED ACTION(S): 1, Open the public hearing. Hear public comment. Close the public hearing. 2. Make the finding the project is exempt from further environmental review incompliance with CEQA Guidelines Section 15164.2. Adopt a resolution approving General Plan Amendment GPA 22-01 (2021-2029 Housing Element Update).

REPORT SUMMARY: The Planning Commission recently recommended adoption of GPA 21- 01 and associated Addendum to the Genera) Plan to the City Council, who brought the approval to fruition on February 10, 2022.

This document underwent minimal revisions following submittal/review from the California Department of Housing and Community Development (HCD) and was finalized by Staff on May 2, 2022. This version (Housing Element Update 52,22) can be found on the City website under the Planning and Building page at the following link address:
http://www.cityofavalon.comutilestorg13182/3213f%5BREVISED%5D_Housing SernentUp date 5.2.22.pdf In order to resubmit to HCD, the element must be formally readopted at a duly noticed public hearing by the City Council as stated in their most recent comment letter received August 18, 2022:
‘The revised draft element meets the statutory requirements described in HCD’s April 12, 2022 review. The housing element will comply with State Housing Element Law (Article 10.6 of the Gov. Code) when it is adopted, submitted to and approved by HCD, in accordance with Government Code section 65585.”
GOAL ALIGNMENT: Affordable Housing and Compliance with Governmental Standards.

FISCAL IMPACTS: There is no fiscal impact associated with the recommended action.

CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: The City of Avalon will not have an approved Housing Element Update and will be out of compliance with State standards.

FOLLOW UP ACTION: Implement City Council direction.

ADVERTISING, NOTICE AND PUBLIC CONTACT: Pursuant to the Brown Act.

ATTACHMENTS: Resolution, Exhibits, HCD Comment Letter 8.18.22.

RESOLUTION NO.

AN RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AVALON, ADOPTING GENERAL PLAN AMENDMENT GPA 22-01
(2021 -2029 HOUSING ELEMENT UPDATE)
WHEREAS, the California Government Code requires that cities review and update their Housing Elements every eight (8) years, according to a schedule set forth by the StateDepartment of Housing and Community Development (“HCD’D; and WHEREAS, the Housing Element sets forth the housing policies for the City, facilitates the preservation and development of housing, and establishes programs to accommodate the City’s share of the regional housing needs in Southern California; and WHEREAS, the City of Avalon has been assigned an allocation of 27 new housing units as its share of the regional housing needs assessment (“RHNA”) in Southern California; and WHEREAS, in accordance with State Law, the City of Avalon has prepared a Draft Housing Element for the 6th Cycle covering 2021-2029 period in accordance with California Government Code Sections 65580-65589.8; and
WHEREAS, following review from HCD, a revised draft was finalized May 2! 2022 (attached hereto as Exhibit A) and resubmitted to the department, at which time it wasdetermined that all statutory requirements have been met; WHEREAS, the Housing Element (2021-2029) complies with the requirements of State law and conforms to the purposes, intent and provisions of all the Elements of the City’s GeneralPlan; and WHEREAS, staff has reviewed and considered the Final Environmental Impact Report (“FEIR”) for the General Plan certified by the City Council (State Clearinghouse No.2011091042), including the impacts and mitigation measures identified therein. In compliance with CEQA Guidelines Section 15164 an Addendum to the General Plan FEIR has been prepared which concludes that the proposed updates to the General Plan Housing Element donot result in any new or greater environmental impacts than were previously analyzed, disclosed, and mitigated. None of the conditions in CEQA Guidelines Section 15162 are present to require the preparation of a subsequent EIR, and no additional environmental review is required; and WHEREAS, on December 3, 2021, pursuant to Government Code section 65585(b)(1), the City submitted the draft 2021-2029 Housing Element to the State of California Department of Housing and Community Development (“HCD”); and
WHEREAS, the California Department of Housing and Community Development must review and provide comments on the Public Draft Housing Element and the City must update the Public Draft Housing Element in response to those comments in order to comply with State Housing Law; and
WHEREAS, on January 19th 2022, the Planning Commission held a duly-noticed public hearing on the subject Amendment, at which all those in attendance were given the opportunity to speak on General Plan Amendment 21-01 (2021-2029 Housing Element Update); and WHEREAS, the Planning Commission considered all the written and oral testimony presented at the public hearing in making its decision to recommend adoption to the City Council via Resolution No. PC 22-03;
WHEREAS, on February 10, 2022, the City Council held a duly-noticed public hearing on the subject Amendment, at which all those in attendance were given the opportunity to speak on General Plan Amendment 21-01 (2021-2029 Housing Element Update); and WHEREAS, on August 2, 2022, pursuant to Government Code section 65585(b)(1), the City submitted the draft 2021-2029 Housing Element (revised 5.2.22) to the State of CaliforniaDepartment of Housing and Community Development (“HCD”); and WHEREAS, the California Department of Housing and Community Development must review and provide comments on the Public Draft Housing Element and the City must update the Public Draft Housing Element in response to those comments in order to comply with State Housing Law; and
WHEREAS, on August 17, 2022, the Planning Commission held a duly-noticed public hearing on the subject Amendment, at which all those in attendance were given the opportunity to speak on General Plan Amendment 22-01 (2021-2029 Housing Element Update revised

5.2.22); and
WHEREAS, the Planning Commission considered all the written and oral testimony presented at the public hearing in making its decision to recommend adoption to the City Council via Resolution No. PC 22-32;
WHEREAS, on September 20, 2022, the City Council held a duly-noticed public hearing on the subject Amendment, at which all those in attendance were given the opportunity to speakon General Plan Amendment 22-01 (2021-2029 Housing Element Update revised 5.2.22); and WHEREAS, the City Council has considered the Planning Commission’s recommendation, the staff report and supporting documents, public testimony, and allappropriate information that has been submitted with the resolution; and WHEREAS, all legal prerequisites to the adoption of the Ordinance have occurred.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AVALON DOES ORDAIN AS FOLLOWS:

Section 1. The City Council finds that adoption of this Resolution is exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15164. An Addendum to the GeneralPlan FEIR has been prepared which concludes that the proposed updates to the General PlanHousing Element do not result in any new or greater environmental impacts than were previously analyzed, disclosed, and mitigated. None of the conditions in CEQA Guidelines Section 15162are present to require the preparation of a subsequent EIR, and no additional environmental review is required.

Section 2. The City Council approves General Plan Amendment GPA 22-01 (2021-2029 Housing Element Update revised 5.2.22), formalized and in substantially similar form as that attached hereto as Exhibit A, subject to any required, incorporated revisions requested by HCD.

PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of the City of Avalori on this 201h day of September, 2022 by the following vote:

AYES:

NOES:

ABSENT:ABSTAIN:

CITY OF AVALON
Ann H. Marshall! Mayor
ATTEST:

Gabrielle Morones, Deputy City Clerk
APPROVED AS TO FORM:

Scott H. Campbell
Best Best & Krieger

This page intentionally left blank.
t
Prepared For:

City of AvalonContact: Susanna Gutierrez (Savitt)
Assistant City Planner
City of Avalon
410 Avalon Cyn RdAvalon, CA 90704
(310) 510-0220h U p :11w
w
w city oVa va Ion, corn I
Prepared By:De Novo Planning Group
Contact: Arnanda Tropiano, Principal
180 E Main Street Suite 108
Tustin, CA 92780
info® d e novopla nn in g . cornhttps://denovoplanning,corn/ 2021-2029

HOUSING

ELEMENT
Adoptcd Revisions to
Adopted Element
February 10, 2O22March
a-1May 2, 2022
This pa9e intentionally left blank.
2021-2029 Housing Element Organization
Part I: Housing Plan
Part 1 of the 2021-2029 Housing Element is the City’s “Housing Plan”, which includes the goals, policies, and programs the City wiLl implement to address constraints and needs. The City’s overarching objective is to ensure that decent, safe housing is available to aLL current and future residents at a cost that is within the reach of the diverse economic segments which comprise Avaton.

Part 2: Background ReportPart 2 of the 2021-2029 Housing ELement is the “Background Report” which identifies the nature and extent of Avalon’s housing needs, including those of special populations, potential housing resources (land and funds), potentiaL constraints to housing production, and energy conservation opportunities. By examining the City’s housings, resources, and constraints, the City can then determine a plan of actionfor providing adequate housing, as presented in Part 1: Housing Plan. In addition to identifying housing needs, the Background Report also presents information regarding the setting in which these needs occur.

This information is instrumental in providing a better understanding of the community, which in turn is essential for the planning of future housing needs.

Appendix A: Housing Sites InventoryThe Housing Element must include an inventory of land suitable and available for residential development to meet the City’s regionaL housing need by income level.

Appendix B: Public Engagement SummaryAs part of the Housing ELement Update process, the City hosted numerous opportunities for thecommunity and key stakeholders to provide feedback on existing housing conditions, housing priorities,priority areas for new residential growth, and topics reLated to fair housing. Public participation playedan important role in the refinement of the City’s housing goals and policies and in the deveLopment of new housing programs, as included in Part 1: Housing PLan. The public’s input also helped to validate and expand upon the contextual information included in Part 2: Background Report. The City’s efforts toengage the community in a meaningfuL and comprehensive way are summarized in Appendix B.

This page intentionally left blank.
c. Adooted Element •:

March 3lMav 2.2O22
•‘r. :3
— r
This page intentionally left blank.

Revisions to
Adopted Element
I .4I’-II -1.1-I I
Adopted February 10, 2022
This page intentionally left blank.
4: Revisnsto
.cHZ AdoDted Element
March 3lMav 2. 2022
Adoptcd Fcbruary 10, 2022
- -. -‘ --
- I
_•II
This page intentionally left blank.
• F Revision;to
Adopted Element
March 3lMay 2, 2022
Adopted February 10, 2022
This page intentionally left blank.

Table of Contents

1. HOUSING PLAN INTRODUCTION 3

2. GOALS AND POLICIES 3
V.A CONSERVATION OF THE EXISTING SUPPLY OF HOUSING 3V.B ASSISTANCE IN THE DEVELOPMENTOFAFFORDABLE HOUSING 4 V.C PROVISION OFADEQUATE HOUSING SITES 4V.D REMOVALOF GOVERNMENTAL CONSTRAINTS 5V.E PROVISIONOFEQUALHOUSINGOPPORTUNITIES S

3. HOUSING PROGRAMS 6
CONSERVATION OF THE EXISTING SUPPLy OF HOUSING PROGRAMS S

ASSISTANCE IN THE DEVELOPMENT OF AFFORDABLE HOUSING S
PROVISION OP ADEQUATE HOUSING SITES 1DREMOVAL OF GOVERNMENTAL CONSTRAINTS 1544 PROVISION OP EQUAL HOUSING OPPORTUNITIES 2144

4. QUANTIFIED OBJECTIVES 2S24
City of Avalon General Plan Housing Element Housing Plan Page 1 This page intentionally left blank.

City of Avalon General Plan Housing Element Housing Plan Page 2

1. Housing Plan Introduction
The Background Report of the Housing Element establishes the housing needs, opportunities, andconstraints in the City of Avalon. The Housing Plan presented in this section sets forth the City’sgoats, policies and programs to address Avalon’s identified housing needs.

2. Goals and Policies
The following goals and policies focus on the maintenance and provision of a variety of housing in terms of type, affordability, and style. The Housing Plan sets forth goals and policies to address thefollowing issue areas:

V.A Conservation of the existing supply of housingV.B Assistance in the development of affordable housing;V.C Provision of adequate housing sites;V.D Removal of governmental constraints; andV.E Provision of equal housing opportunities.

V.A CONSERVATION OF THE EXISTING SUPPLY OF HOUSINGGoal V.A: Maintain and enhance the quality of residential neighborhoods.Policy V-i: Advocate the rehabilitation of substandard residential properties by homeowners and landlords.

Policy V-2: Continue to utilize the Citys code enforcement program to bring substandard units into compliance with City codes and to improve overall housing quality andconditions.

Policy V-3: Discourage the demolition or conversion of existing year-round housing units and encourage the provision of similar replacement units when demolition or conversion results in the reduction of the City’s year-round or affordable housing inventory.

Policy V-4: Educate the public regarding the need for property maintenance and rehabilitation, code enforcement, neighborhood conservation and beautification, and other relatedissues.

Policy V-5: Pursue a combination of public and private actions to rehabilitate and maintain the existing stock of housingEducatc the public regarding the need for property maintenance and rehabilitation, code enforcement, neighborhood conservation and Policy V-6: Monitor “at-risk” affordable housing and proactively address potential conversion of affordable units to market rate units prior to their transition.

Policy V-7: Implement monitoring program for existing affordable housing and funding sources.

City of Avalon General Plan I Housing Element Housing Plan I Page 3 V.B ASSISTANCE IN THE DEVELOPMENT OF AFFORDABLE HOUSINC Goal V.B: Support increased affordable housing opportunities that are adequately served with infrastructure and services.

Policy V-8: Support innovative public, private, and nonprofit efforts in the development and financing of affordable and/or special needs housing.

Policy V-9: Support strategies that promote home ownership options for Lower, moderate, and middle income households
Policy V-iO: Encourage energy-efficient building methods and promote energy conservation measures.

Policy V-il: Offer housing rehabilitation assistance for Lower and moderate income households for home repairs and energy conservation measures.

Policy V-12: Advocate for and support strategies that increase resiliency and expand fresh water availability to address projected housing needs and public safety requirements.

Policy V-i 3: ColLaborate with locaL, regional, and State utility providers to help creativeLy address the City’s infrastructure needs.

Policy V-14: Prioritize water alLocation for affordable housing for lower and moderate income households as required by State law.

V.C PROVISION OF ADEQUATE HOUSING SITES
Goal V.C: Provide for the development of a variety of housing types in Avalon, and attain dignified, safe, and affordable housing opportunities within decent livingenvironment for households of all socioeconomic segments in Avalon.

Policy V-iS: Maintain adequate capacity to accommodate the City’s unmet Regional Housing Needs Allocation (RHNA) for all income categories throughout the planning period, Policy V-16: Provide a variety of residential development opportunities in the City, incLuding year-round housing and seasonal empLoyee housing.

Policy V-17: Address the housing needs of lower, moderate, and middle income households, as well as households with special needs.

PoLicy V-iS: Pursue State and federal funding sources to maintain the supply of affordable housing in Avalon.

PoLicy V-i9: Support the plans of private landowners to develop housing affordable to Lower, moderate, and middle income households at Company-owned property.

Policy V-ZO: Promote the development of accessory dwelling units and junior accessory dwelLing units as a viable opportunity to expand the City’s existing housing stock.

City of Avalon General Plan Housing Element Housing Plan Page 4 Policy V-il: Allow by-right approval for housing developments proposed for non-vacant sites included in one previous housing element inventory and vacant sites induded in two previous housing elements, provided that the proposed housing development consists of at Least 20 percent Lower income and affordable housing units.

V.0 REMOVAL OF GOVERNMENTAL CONSTRAINTSGoal V.D: Ensure that government actions, policies, and regulations do not adversely impact the provision of year-round affordable and market-rate housing, seasonal employee housing, and special needs housing.

Policy V-22: Encourage the use of density bonuses and provide other regulatory concessions to facilitate affordable housing development.

Policy V-23: Expedite project review of residential deveLopments with an affordabLe housing component.

PoLicy V-24: Review and modify as necessary and appropriate City poLicies and regulations to faciLitate housing development.

V.E PROVISION OF EQUAL HOUSING OPPORTUNITIESGoal V.E: Promote equal opportunity for all residents to reside in housing of their choice.

Policy V-25: Promote fair housing practices in the sate or rental of housing with regard to race, coLor, nationaL origin, ancestry, reLigion, disabiLity, sex, age, maritaL status, famiLiaL status, source of income, and sexual orientation.

Policy V-26: Accommodate persons with disabilities who seek reasonabLe waiver or modification of land use controls and/or development standards pursuant to procedures and criteria set forth in the Zoning Ordinance.

Policy V-27: Assist in affirmatively furthering and enforcing fair housing laws by providing support to organizations that provide outreach and education regarding fair housing rights,receive and investigate fair housing alLegations, monitor compliance with fairhousing Laws, and refer possibLe violations to enforcing agencies.

Policy V-28: Continue to solicit public input from all economic segments of the community in the City’s housing policies and activities.

City of AvaLon GeneraL Plan Housing Element Housing Plan Page 5

3. Housing Programs
This section describes the programs that will implement Housing Element goaLs and poLicies. The housing programs define the specific actions the City wiLL undertake in order to achieve the goaLs for the current planning period. Pursuant to State law, the programs address the following issue areas:

1. Conserve and improve the existing housing stock

2. Develop housing

3. Minimize the impact of constraints on housing production

4. Assure equal housing opportunity for alt residents,
Conservation of the Existing Supply of Housing Programs

1. Housing Rehabilitation Program
The Avalon Housing Authority reinstated the Housing RehabiLitation Loan program in 2011. The program provides rehabilitation assistance to low and moderate income households up to $40,000 (but not Less than $5,000) for code corrections, lead-based paint abatement, asbestos removal, accessibiLity improvements, and energy conservation improvements.

Responsible Agency: Planning and Building Department
Financing: RedeveLopment Housing Set-Aside funds (balance as avaiLable) Program Objectives: Disseminate information via City website and newsletter to homeowners regarding rehabilitation standards and the Housing Rehabilitation Program, with a focus on reaching the landlords of nontransient rental housing through direct emails or mail in order tosupport the preservation of year-round rental units which are most Likely to serve the needs of the community’s special needs househoLds; the Lack of year-round affordable housing options is identified as a fair housing contributing factor,
Provide housing rehabilitation assistance to lower and moderate income househoLds, including extremeLy Low income households1 Based on the City’s communitywide household median income survey, these households are more likely to be Located closer totown; target outreach will be focused on this geographic area wherespecial needs households are most likely to be.

Pursue additional funding from State and federal programs.

Assist 2 extremely very low, 2 very low, 2 Low, and 2 moderate income households with rehabilitation.

ScheduLe: Update City website with current orogram information by October 2022: include program information in City newsletter at Least once annualLy; ; pursue avaiLable
State and federal funding by submitting applications at least annuaLly; assist at Least one household per year; Gongoing City of Avalon General Plan Housing Element Housing Plan Page 6 implementation and annual reporting during the planning period

2. Code Enforcement
The PLanning and Building Department handles the enforcement of the Citys zoning regulations and building and housing codes. Complaints received are investigated for possible violations and compliance is handled first by direct person to person visit or by teLephone to discuss the violationsand obtain voluntary compliance. The Building Department also works with other City departmentsand outside State and County agencies.

Responsible Agency: Planning and Building DepartmentFinancing: General FundsProgram Objectives: Investigate 100% of possible code violations.

Disseminate information on housing rehabilitation assistance available to address code violations and other housing issuesConserve one unit per year for a total of eight units during the planning period.

Schedule: Review Code Enforcement complaints quarterly and identify areas for targeted outreach the following quarter; Qongoingimplementation and annual reporting during the planning period

3. Nontransient Rental Inspection Program
The City will continue to implement its Nontransient Rental Inspection Program to ensure all nontransient rentals comply with minimum property maintenance requirements, preserve the City’shousing stock, encourage proactive and preventive maintenance of properties, protect vulnerable tenants, and promote the heaLth, safety, and welfare of the people of Avalon.— Responsible Agency: Planning and Building DepartmentFinancing: General FundsProgram Objectives: Investigate 100% of possible violations. Inspect at Least four (4) nontransient rentals annually starting in 2024 (for a total of at least 24 inspections during the PLanning Period); target early programinspections (2024-2026) in areas with lower househoLd incomes.

Schedule: Review
Nontransient Rental Inspection Program annually to evaluate effectiveness and modify the program, as necessary, to achieve Cityobjectives; Qongoing implementation and annual reporting duringthe planning period City of Avalon General Plan Housing Element Housing Plan Page 7

4. Preservation of At-Risk Units
Pursuant to the Housing ELement Law, the at-risk housing analysis covers a ten-year period from the start date of the Housing Element cycLe. No deed-restricted affordable units are at-risk of conversionto market rate units during the next 10 years. The earliest date of conversion for any project is 2033for the Tremont Street Apartments, which provides 62 affordable units; this project’s Section 8 contract was extended in 2016 and the City will continue to proactively work with the property ownerto support extension of the contract.

Responsible Agency: Planning and Building Department; Avalon Housing Authority Financing: Redevelopment Set-Aside funds (balance as available); Housing Trust Fund; Proposition 1C funds
Program Objectives: Monitor status of alL affordable housing units by maintaining contact with property owners and HUD Multi-Family Housing division.Work with property owners intending to opt out of the affordability covenants to ensure tenants receive adequate notice.

Schedule: Ongoing implementation and reporting during the planning period Assistance in the Development of Affordable Housing

5. First-Time Homebuyers Assistance
The City’s existing program provides “silent second” mortgage assistance, downpayment and closingcost assistance. The current program is Limited to househoLds at 120 percent of AMI or Less, with a maximum assistance of $250,000 per household.Responsible Agency: Planning and Building DepartmentFinancing: Housing Trust Fund: CaIHFA; Redevelopment Housing Set-Aside funds (balance as available)
Program Objectives: Disseminate information to homeowners on the First-Time Homebuyers Assistance Program via City website and newsLetter.Provide homeownership assistance to Lower and moderate incomehouseholds.

Pursue additional funding sources such as CaIHFA (California HousingFinance Agency.

Strive to provide first-time homebuyer assistance to four (4) loweror moderate-income households based on quaLified appLicants andfunding avaiLabiLity.

Schedule: Update City website with current program information by October 2022; include program information in City newsLetter at least once City of Avalon General Plan Housing Element Housing Plan Page 8 annually; pursue available funding by submitting applications at least annually; Gongoing implementation and annual reporting during the planning period

6. Housing Trust FundIn 2004, the City Council approved the creation of a Housing Trust Fund reserved for the production of affordable housing. In the past, the Council has shifted a fraction of the Transient Occupancy Tax (TOT) for affordable housing, which is deposited into the Housing Trust Fund.

Responsible Agency: Planning and Building DepartmentFinancing: Housing Trust Fund Program Objectives: Identify the appropriate sources of funds (such as inclusionary housing in-Lieu fees and Transient Occupancy Tax) to replenish theHousing Trust Fund.

Identify eligible programs/activities to be funded.Provide direct support to eight (8) lower- or moderate-incomehouseholds through programs funded by the Housing Trust Fund (i.e., see Program 5, First-Time Homebuyers Assistance); these householdsshould be from areas of Lower-income or lower-opportunity, such as households closer to town which tend to exhibit these characteristics at higher levels than households in the hills. Programs funded by the Housing Trust Fund must support the City’s duty to affirmatively further fair housing by promoting fair housing outreach andeducation, providing opportunities for housing and mobilityenhancement, creating new housing choices and affordability in high opportunity areas, promoting place-based strategies for communitypreservation and revitalization, and addressing displacement risk.

Schedule: On a quarterly basis, review the Housing Trust Fund balance: at least annually, evaluate potential sources of funding to replenish the Housing Trust Fund and take action if necessary to maintain an appropriate Housing Trust Fund balance; identify eligible programs/activities to be funded at (east annually; Qongoing implementation and annual reporting during the planning period

7. Temporary Summer Housing
The greatest demand for employees is during the summer season when housing is Least avaiLable.

Setting up seasonal housing makes it possible for employers to hire temporary workers that can move in and out as required. The City will continue working proactively with the Santa Catalina IslandCompany and other affordable housing developers regarding the development of seasonal employeehousing. Additionally, the City will continue implementing requirements for hotels, motels, and resort uses and new commercial development to provide rental space for at least 50% of the number of peak season employees at the time all required City entitlements have been granted. This programwill benefit lower income employees, including extremely low inèome employees.

Responsible Agency: Planning and Building Department
City of Avalon General Plan Housing Element Housing Plan Page 9 Financing; General Funds
Program Objectives: Pursue seasonal employee housing with the Company and other resort, commercial, and retail business owners and affordablehojsing developers.

Schedule: Meet bimonthly with the Company to discuss ongoing programs and activities to address the community’s affordable housing needs;prior to the summer season (i.e., in February of each year) meet with the Company to review plans for temporary summer housingand work collaboratively to address the needs of short-term tenants; at least annually, reach out to affordable housing developers todiscuss the community’s unique summer housing needs and advertise opportunities for the development of affordable housing; at leastannually. proactively reach out to hotels, motels and resort uses and new commercial development to confirm availability of space to accommodate temporary summer workers: on an annual basis or asfunding is available, apply for funding to support the development, maintenance, and improvement of affordable housing; oQngoing implementation and annual reporting during the planning period Provision of Adequate Housing Sites

8. Affordable Housing Development
The City, through its Housing Authority, will continue to pursue funding for affordable housing development and acquisition, rehabilitation, and resyndication. The City will work protectively withthe Company and other qualified developers to pursue appropriate funding. City involvement may include:
• Review of pro forma analyses;
• Provision of demographics and other background data far preparation of funding applications;• Review and comment on draft funding applications:• Provision of letters of support; • Assistance in monitoring compliance with funding program regulations; and• As necessary and financially feasible, provision of Local match funds.

The City’s website will be used to promote housing programs and assistance available to residents and property owners.

Responsible Agency: Planning and Building Department
Financing; General FundsProgram Objectives: Issue NOFAs to solicit housing developers with experience in projects receiving State and Federal funding.

Provide information on incentives and funding available to facilitate affordable housing development. Prioritize funding allocation toaffordable housing projects that include extremely low income units.

City of Avalon General Plan Housing Element Housing Plan Page 10 Evaluate the opportunity for pursuing affordable housing funds through the State Department of Housing and Community
Development (e.g., Proposition 1C funds) and HUD.Publicize City programs and assistance available on City website and monthly newsletter.Strive to promote development of 12 new housing units affordableto lower- and moderate-income year-round tenant households in areas with higher levels of opportunity to enhance housing mobility.

Schedule: Issue NOFAs on a biennial basis or as often as needed to support the development of housing affordable to tower income households, inconsultation with the Company; proactively provide information onCity incentives and funding available to the development communityon an annual basis: on an annual basis identify and pursue State andfederal funding; at least once annually, publicize city programs andassistance via the City’s monthly newsletter; update the City’swebsite with current program information by October 2022; Qongoing implementation and annual reporting during the planning period

9. Inclusionary Housing Program
The City amended its Inclusionary Housing Program in 2020 in compliance with State law and continues to implement the program.

Responsible Agency: Planning and Building DepartmentFinancing: General FundsProgram Objectives: Continue to implement the inclusionary housing ordinance and monitor its implementation.Promote the production of eight (8) new housing units (for-sale orrental) exclusively available to serve the needs of year-round loweror moderate-income households through implementation of theCity’s Inclusionary Housing Program.

Schedule: Annual review of Inclusionary Housing Program for compliance with State law; Gongoing implementation and reporting during theplanning period

10. Identification of Adequate Sites
The City has a 2021-2029 projected RHNA need of 27 housing units including 16 housing units forextremely low, very low, and low income households. The City will continue to work with propertyowners, specifically the Santa Catalina Island Company, to maintain an inventory of adequate sitesappropriate to meet its RHNA.

Responsible Agency: Planning and Building Department; Santa Catalina Island CompanyFinancing: General Funds City of Avalon General Plan Housing Element Housing Plan Page 11 Program Objectives: Adequate sites to accommodate 4 extremely Low income units; 4 very Low income units, 5 low income units; 3 moderate income units;and 11 above moderate income units.

Schedule: Ongoing implementation and reporting during the planning period

11. Adequate Sites Monitoring Program
To ensure that the net future housing capacity is maintained to accommodate the City’s RHNA, theCity will create an updated inventory of adequate housing sites for each income category. This inventory will detail the amount, type, size and location of vacant land (if any), and recyclable properties and parcels that are candidates for consoLidation to assist developers in identifying Land suitable for residentiaL development. In addition, the City wiLL continuously monitor the sitesinventory and the number of net units constructed in each income category. If the inventory indicates a shortage of adequate sites to accommodate the remaining RHNA, the City wilL identify alternativesites so that there is no net loss of residential capacity pursuant to Government Code Section 65863.

To facilitate annual evaLuation, the City will impLement a formal ongoing project-by-project procedure pursuant to Government Code Section 65863 which will evaluate identified capacity in the sites inventory relative to projects or other actions potentiaLly reducing density and identifyadditional sites as necessary. This procedure and annual evaluation will address residentiaL or mixeduse zoned land to determine whether these sites are being developed for uses other than for housing.

If a shortfaLl in sites capacity occurs, the City will identify replacement sites within six months.

Responsible Agency: Planning and BuiLding Department; Santa Catalina Island CompanyFinancing: General Funds Program Objectives: By the end of 2022, develop a formal ongoing procedure to evaluate capacity and identify additional sites as necessary.

Continue to perform project-by-project evaluation to determine if adequate capacity remains for the remaining RHNA.

Schedule: Develop formal procedure to monitor availability of sites by December 2022; Oongoing implementation and reporting during the planning period

12. Density Bonus Program
The City will provide for density bonuses consistent with State law, including density bonuses and incentives for projects that contain 100% very low- and low-income units. The City will monitor State Law updates which impact density bonuses and wilt update Local plans and programs as necessary.Responsible Agency: PLanning and BuiLding DepartmentFinancing: General Funds Program Objectives: Amend the Zoning Ordinance to be consistent with State Density Bonus Law and to List specific incentives and regulatory concessions that will be offered by the City.

Market density bonus program to developers by providing City of Avalon General PLan Housing Element Housing Plan Page 12 information on density bonus, incentives, and regulatory concessions available to facilitate affordable housing development.

Schedule: Amend the Zoning Ordinance to be consistent with State Density Bonus law by December 2022; on at least an annual basis, proactively advertise the City’s density bonus provisions to the development community; at least annuaLly, monitor State legislation for updates to the Density Bonus law and, as necessary, update the City’s Zoning Ordinance to be consistent with future updates Ongoing, 2023

13. Replacement of Affordable Units
Consistent with the requirements of Government Code Section 65583.2(g), development projects onsites in the housing inventory (Appendix A) that have, or have had within the past five years precedingthe application, residential uses restricted with rents affordable to low- or very low-income households or residential uses occupied by lowS or very Low-income households, shall be conditionedto replace all such units at the same or lower income level as a condition of any development on the site, and such replacement requirements shall be consistent with Section 65915(c)(3).

Responsible Agency: Planning and Building DepartmentFinancing: General Fund Program Objectives: For all project applications, identify need for replacement of affordable housing units and ensure replacement, if required, occurs.

Schedule: Ongoing implementation and annual monitoring and reporting throughout the planning period
l4. _Accessory Dwelling Units
Accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs) help meet the City’s housing needs for all income levels and also provide a housing resource for seniors and low- and moderate-income households throughout the entire community, not just in any single geographic area. The City will continue to apply Zoning Ordinance regulations that allow accessory units (also known as second units or granny flatsi by right in all residential zones, in accordance with State law.

The City of Avalon will continue to amend the ordinance based on future changes to State law andwork with HCD to ensure continued compliance with State law. The City will also continue to monitor the extent of ADU production to ensure that the ordinance modifications are successful and that theHousing Element goals can be met.Responsible Agency: Planning Department Financing; General fundProgram Objectives: Update the City’s existing ADU and zoning ordinances to comply with State Law. Collect information on rental rates for ADUs.

Survey and evaluate potential methods to encourage ADU
development throughout the community and adopt appropriateprocedures, policies, and regulatory provisions.

Monitor State law for future updates to ADU regulations and update City of Avalon General Plan Housing Element Housing Plan Page 13 the City’s Development Code to be consistent with future updates as needed.

Continue educating the community on the opportunity to deveLop ADUs and promote the development of ADUs affordable to lowerincome househoLds.

Continue to provide information about ADUs on the City’s website and on pubLic counters.

Update ADU and zoning ordinances by December 2022: review ADU production and affordability every two years, and if AOl) production does not keep pace with projections identified in the Housing Element, confirm that the City maintains adequate capacity to accommodate its RHNA and if a shortfalL exists, identify replacementsites concurrent with the bienniaL ADU production and affordability review; update the City’s ADU application to request information on rental rates by October 2022: Ongoin; ongoing implementation and annual monitoring and reporting throughout the planning period Schedule:

City of Avalon General Plan Housing Element Housing Plan Page 14

15. Adequate Sites for Lower Income Households on Nonvacant and Vacant Sites Previously Identified
The City of Avalon wilt rezone to aLlow developments by right pursuant to Government Code section65583.2(i) when 20 percent or more of the units are affordabLe to Lower income househoLds on sitesidentified in Appendix A to accommodate the Lower income RHNA that was previousLy identified in past housing elements. SpecificaLLy, the City wilt rezone the 1.52-acre nonvacant site located at Tremont Street (APH 7480002072) previousLy identified in the 5th cycLe housing element.

Responsible Agency: PLanning DepartmentFinancing: GeneraL fundProgram Obiectives: Create opportunity for at Least 30 units of rentaL housing for lower income househoLds.

Schedule: Site rezoned by October 2023.

Removal of Governmental Constraints
4516. Monitoring Potential ConstraintsThe City wilt periodically review City regulations, procedures and fees to identify any potential constraints to the deveLopment and maintenance of housing, The City wiLl outreach to the
deveLopment community to assist in this review. If the City finds that regulations, procedures and/or fees are a constraint to housing, the City will revise requirements or policies as necessary.

Responsible Agency: Planning DepartmentFunding: General Fund Program Objectives: Review and revise the zoning and deveLopment standards if needed.

Schedule:

On a biennial basis, review, in consultation with the developmentcommunity, the City’s regulations, procedures and fees to identifyany potential constraints to the development and maintenance ofhousing; host a biennial developers roundtable to discuss housingopportunities in Avalon and identify potential governmentconstraints to housing that can be modified or removed; Qongoingimplementation and annual monitoring and reporting throughout the planning period
City of AvaLon General PLan Housing Element Housing Plan Page 15 4417. Monitoring Reasonable Accommodation Procedures
The City will update its reasonable accommodation findings to improve approval certainty and will,mQyingjorward evaluate adopted reasonable accommodation procedures annually and revise asappropriate to ensure consistency with fair housing requirements.J Funding: General Fund
Program Objectives: Update existing reasonable acconmodating approval certainty and Rreview andaccommodation procedures if needed. findings to improve
revise reasonable
Schedule:

ConsiderApprove aLL (100%) reasonabLe accommodation requests a4 approve aLL rpquets that compLy with updated local regulationsfound to be consistent with State Law.

Provide for at least three reasonabLe accommodations annualLy.

Annually Update existing findings by December 2023 and review reasonable accommodation procedures annually
4-718. Zoning Development Code Updates - Remove ConstraintsThe City shall update the Zoning Development Code to remove constraints to a variety of housingtypes and ensure the City’s standards and permitting requirements are consistent with State Law.

The update shall address the following.

I. Low barrier navigation centers: The Development Code shall be updated to define and permit Low harrier navigation centers consistent with the requirements of Government Code Sections 65660 through 65668, including treating low barrier navigation centers as a use by right in areas zoned for mixed use and nonresidential zones permitting muLtifamily uses.

2. Agricultural worker housing: The DeveLopment Code will be updated to define agricultural worker housing and to identify that any agricuLtural worker housing consisting of no morethan 36 beds in a group quarters or 12 units or spaces shaLl be deemed an agriculturaL landuse and permitted in the same manner as agricultural uses consistent with Health and SafetyCode Section 17021.6. The Development Code will also be updated to provide forstreamlined, ministerial approval of agriculturaL worker housing that meets the requirementsof HeaLth and Safety Code Section 17021.8. 3, Streamlined and ministeriaL review for eligible affordabLe housing projects: The DeveLopment Code wilL be updated to ensure that eligible multifamily projects with an affordabLe component are provided streamLined review and are onLy subject to objective design standards consistent with relevant provisions of SB 35 and SB 330 as provided by applicabLesections of the Government Code, incLuding but not limited to Sections 65905.5, 65913.4, 65940, 65941.1, 65950, and 66300. State law defines objective design standards as those that “involve no personal or subjective judgement by a public official and are uniformly verifiabLe Responsible Agency: Planning Department
City of Avalon General Plan Housing Element Housing Plan Page 16 by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant and public official prior to submittal.”

4. Emergency shelter parking: The Development Code wilt be updated to require sufficient parking to accommodate alt staff working in the emergency shelter, provided that thestandards do not require more parking for emergency shelters than other residential or commercial uses within the same zone, in compliance with AB 139.

5. Transitional and Supportive Housing. The Development Code will be updated to define and regulate Transitional and Supportive Housing in accordance with State Law.

6. Residential Care Facilities. The Development Code will be updated to define and regulate Residential Care Facilities in accordance with State law; specifically, the City will permit group homes (six or fewer and seven or more persons) in residential zones with objectivityto promote approval certainty without constraints on housing for persons with disabilities.

7. Employee Housing. The Development Code will be updated to ç ply with Health and Safety Code Section 17021.5 which requires that employee housing fo x or fewer employees be treated as a single-family structure and permitted in the same ma eras her dwellings of the same type in the same zone. it’
61-8.Permanent Supportive Housing. The Development Co WILL u ted to comply with government Code section 65651 which states that supportIve In s LL.bé a use by-rightin zones where multifamily and mixed uses are permitted, In nonresidential zones permitting multifamily uses.

Responsible Agency: Planning and Building DepartmentFinancing: General FundsProgram Objectives: Revise the Development Code in accordance with this program by October 20242023.

Schedule: Development Code adoption in 202.42023
4-819. Prohousing Designation Program %t
Increasing the availability of housing statewide is critical to bettering the quality of life of all Californians and to ending homelessness. The 2019-2020 Budget Act provided a spectrum of support,incentives, and accountability measures to meet California’s housing goals, and provided for theestablishment of the Prohousing Designation Program. The Prohousing Designation Program providesincentives to cities and counties in the form of additional points or other preference in the scoring of competitive housing, community development, and infrastructure programs. The California Department of Housing and Community Development established the Prohousing Designation Programto administer these incentives.Local governments can receive a designation when implementing Prohousing policies and receive an advantage when applying for several funding programs including:
• Affordable Housing & Sustainable Communities (AHSC)• Infill Infrastructure Grant (hG)• Transformative Climate Communities (TCC) Other programs may be added to the list after HCD engages with stakeholders and partner agencieson adding Prohousing points to other housing and non-housing programs.

The City of Avalon will pursue the Prohousing Designation to memorialize the City’s commitment to helping promote more affordable housing options. HCD is expected to assess the City’s Prohousing City of Avaton General Plan Housing Element Housing Plan Page 17 Policies using the following four scoring categories: Favorable Zoning and Land Use; Acceleration of Housing Production Timeframes; Reduction of Construction and Development Costs; and ProvidingFinancial Subsidies. The City must demonstrate that it has enacted or proposes at [east one policy that significantly contributes to the Acceleration of Housing Production in each of the fourcategories. A Prohousing Designation requires a total score of 30 points or more across all fourcategories (as of November 2021). As part of the application process, the City will identify thosestrategies that it already implements (i.e., establishment of streamlined, program-level CEQAanalysis and certification of general plans) and identify additional strategies for implementation inorder to further promote housing development in Avalon and achieve the required score to receivethe Prohousing Designation.

The City will work with HCD’s ongoing technical assistance team to submit an application by the endof 2022 with the objective of receiving the designation by March 2023.

Responsible Agency: Planning Department.Financing: General fund; grantsProgram Objectives: Achieve Prohousing Designation by HCD Schedule: Submit application to HCD by December 2022 and receive designation by March 2023
4420+. Water AvailabilityWater availability is perhaps the most critical issue limiting residential development. Fresh water for drinking is supplied by Southern California Edison and saltwater is used for sanitary purposes and fireprotection. Avalon has a limited alluvial groundwater supply and thus obtains most of its presentneeds through local reservoirs.

Because water is such a limited resource on Catalina Island, the Southern California Edison has fresh water allocation policies which govern the issuance of new water permits and water rationing in periods of drought. Given the limited water supply, developers must receive water allocations from the Southern California Edison (SCE) prior to receiving City approval of new development.

Recognizing the importance of affordable housing, SCE reserves water supply allocation for low and moderate income housing.

The City of Avalon is committed to proactivelv do what it can to support Edison’s ability to 1) improvethe existing domestic water system and 2) expand its capacity. The City and Edison have collaboratedon this program and have identified two key ways the City can help address the topic of wateravailability. First, City will continue to maintain regular contact with Edison to coordinate elementsof Edison’s Water Master Plan with elements of the City’s General Plan so that they can complementone another; this coordination will happen at least annually. Additionally, to support future capacityincreases, the City will proactively communicate its support directly to the Authority HavingJurisdiction, as appropriate, during the public comment periods of proposed projects. This includesthe City communicating support for increased allocations to the California Public Utility Commission (CPUC) to promote additional development in the City.

The City will also, on an annual basis, identify funding (State and federal funding and grants) available to support system upgrades and expansions and proactively share this information with SCEand discuss ways that the City can help support a successful application. This could include the CityCouncil adopting a Resolution in support of specific funding opportunities or planned improvements.

The City Council will continue to request regular updates from SCE (approximately quarterly) and City of Avalon General Plan Housing Element Housing Plan Page 18 wiLl identify, cotLaborativeLy, new or unique approaches available to improve the existing system and expand capacity.
uiIiI1i.
‘I 10 vQSS(11
Responsible Agency: PLanning DepartmentFunding: General Fund Program Objectives: Meet with Edison annually to collaborate on water availability; Schedule: Annually—On an annual basis, the City will proactively identify funding opportunities and provide this information to SCE; SCE willprovide regular (generally quarterly) updates to the City Council; theCity wiLL adopt Resolutions, provide Letters of support, and other inkind services to support SCE’s maintenance and i ‘orovement plans on at Least an annual basis: I
21, Priority Water and Sewer ServiceWater and sewer service providers must establish specific procedures to grant priority water andsewer service to deveLopments with units affordabLe to lower-income househoLds. (Gov. Code, § 65589.7.) Given that the City is the sewer provider (maintenance of the system is contracted out),the City wilL establish a written procedure to comply with Coy. Code, § 65589.7 early in the pLanningperiod.

ResponsibLe Agency: Planning DepartmentFunding: GeneraL FundProgram Obiectives: Establish a written procedure to grant priority sewer service to development of units affordabLe to Lower-income househoLds.

Schedule: December 202322. Sewer Service
The City of Avalon owns the wastewater conveyance system within City and contracts with a thirdparty professional for operation and maintenance. The City’s overall wastewater collection system is City of Avaton GeneraL Plan Housing Element Housing Plan Page 19 reguLated under the jurisdiction of the RegionaL Water Quality ControL Board, the State Water Resources ControL Board, and the U.S. Environmental Protection Agency. Within Avalon, there are approximately 10.2 miles of sewer ranging in diameter from 6-24 inches. Avalon’s sewer pipelines areold and Leaks have been identified throughout the system, contributing to the degradation of waterquaLity in Avalon Bay. AccordingLy, the City has taken action by completing a comprehensive inspection of the entire sewer colLection system to assess the condition of each pipeLine within the system.The results of this comprehensive inspection cuLminated in the Sewer Collection System Capital Improvement and 20-Year FinanciaL PLan (Capital Improvement and FinanciaL Plan), adopted in 2013.

The Capital Improvement and Financial PLan identifies facility and equipment requirements forsustaining, restoring, and modernizing the faciLities and infrastructure that support the wastewatercollection and treatment. It also prioritizes and schedules them for funding and implementationthrough a muLti-year pLan. The Sewer System Management Plan, updated in 2014, incLudes mitigation measures to address the issues identified through the comprehensive inspection sand the City is in theprocess of updating the capitaL improvement plan to remove deficiencies in the wastewater system.

According to comprehensive inspection, the local sanitary sewer system has adequate capacity to accommodate deyeLopment associated with General Plan buildout projections, which includes the RHNA. Nonetheless, individual deveLopments would be reviewed prior to project approval to determine if sufficient sewer capacity exists to serve the proposed development. The City charges fees for connecting to the sewerage system or increasing the existing strength and/or quantity ofwastewater attributable to a particular parceL or operation aLready connected. The fees are requiredto construct new sewer infrastructure and/or incrementaL expansions to the existing seweragesystem to accommodate individuaL deveLopment.The City is in the process of updating its Sewer Collection System CapitaL Improvement and 20-Year FinanciaL Plan (Capital Improvement and Financial Plan); this update is expected to be completed in 2022. This update wilL best position the City to provide and maintain an adequate sewer system andperform upgrades and expansions as necessary to accommodate its RHNA.Responsible Agency: Planning DepartmentFunding: General FundProgram Objectives: Maintain a current the Sewer CoLlection System Capital Improvement and 20-Year Financial PLan (CapitaL Improvement and Financial Plan).Pursue available funding to improve and update the existing sewer system.Collect fees associated with new development.

Update the Sewer CoLLection System Capital Improvement and 20-YearFinancial Plan (CapitaL Improvement and Financial Plan) by 2022; atleast annuaLly, pursue avaiLabLe funding for system upgrades or expansion; as part of the development review process, colLect fees as required to construct new sewer infrastructure and/or incremental expansions.

Schedule:

City of Avalon General Plan Housing Element Housing Plan Page 20 Provision of Equal Housing Opportunities
2023. Fair HousingThe City enforces the State and Federal Fair Housing laws within its jurisdiction. As a participatingjurisdiction of the Los Angeles County CDBG program, the City is served by the Housing Rights Center Financing: General Funds
Program Objectives: Provide fair housing information via City website and public counters.

Ensure multi-Lingual materials from the fair housing service providers are available to residents.Connect 20% more households with the Housing Rights Center over2021 referral numbers.

Schedule: Ongoing implementation and annual monitoring and reporting throughout the planning period
24-24. Section 8 Housing Choice VouchersThe Housing Choice Voucher program (formerly Section 8) extends rental subsidies to very lowincome households, including families, seniors, and the disabled. The program offers a voucher that pays the difference between the current fair market rent (FMR) as established by the U.S.Department of Housing and Urban Development (HUD) and what a tenant can afford to pay (i.e.1 30percent of household income). The voucher allows a tenant to choose housing that costs above thepayment standard, providing the tenant pays the extra cost. A portion of the vouchers is reserved for household with extremeLy low incomes.The Los Angeles County Housing Authority administers the Housing Choice Voucher program on behalfof the City of Avalon Housing Authority. Given the continued need for rental assistance for very lowincome households, the City will continue to promote this program through dissemination of brochures at public counters, providing information on the City’s web-site, and referring residents and property owners to the Los Angeles County Housing Authority.

Responsible Agency: PLanning Department; Los Angeles County Housing AuthorityFinancing: HUD Section 8 aLlowanceProgram Objectives: Continue to promote the Housing Choice Voucher program to residents and property owners through dissemination of brochures at Responsible Agency: Planning and Building Department
City of Avalon General Plan Housing Element Housing Plan Page 21 public counters, providing information on the City’s web-site, and referring residents and property owners to the Los Angeles CountyHousing Authority.

Schedule: Ongoing implementation and annual monitoring and reporting throughout the planning period

25. Coordination on Homeless IssuesThe City will coordinate with local organizations and the County of Los Angeles to address homeless issues in the City. Given that access to regional facilities for persons experiencing homelessness in Avalon is limited, the local community partners play a key role in providing services in emergencysituations. The Catalina Bible Church and the Avalon Community Church provide emergencyassistance for those in need. The Catalina Bible Church provides emergency shelter for up to two people for a maximum of two days (in emergency situations, all the churches on the Island allowhomeless individuals to sleep on floors). The Catalina Bible Church also operates a Food Ministry, which provides a week of food (20 to 25 Ibs) for at a low cost. The Avalon Community Church provides emergency food as well as emergency housing. The Avalon Community Church typicallyaccommodates up to three persons each night on a couch or pull-out mattress at the Teen Centerafter the Center is closed for the day. There is no limit on the length of stay but individuals must leave the facility in the morning. At this time, the Church only has capacity to accommodate males in need. The Church continues to explore other arrangements for women in need.

Responsible Agency: Planning, County of Los Angeles; Faith-Based OrganizationsFinancing: General FundProgram Objectives: Address homeless issues Schedule: Ongoing implementation and annual monitoring and reporting throughout the planning period
fl26. Affirmatively Furthering Fair housing Outreach and Coordination ProgramTo comply with California Government Code Sections 8899.50, 65583(c)(5), 65583(c)(10), 65583.2(a) (AB 686), the City will develop a plan to Affirmatively Further Fair Housing (AFFH). The AFFH Plan shall take actions to address significant disparities in housing access and needs for all persons regardless of race, color, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, familial status, source of income, or disability, and any other characteristic protected bythe California Fair Employment and Housing Act (Part 2.8, commencing with Section 12900, of Division 3 of Title 2), Government Code Section 65008, and any other state and federal fair housing and planning law. Programs which assist in affirmatively furthering fair housing are includedthroughout this Housing Plan; where they are reiterated here, the specific program in the Housing Plan should be referenced for more discrete objectives and timeframes. The City’s actions -Specific actions include:Fair Housing Education and Outreach
• Annual training of City staff, including through coordination with local advocacy groups, on how to receive, log, refer, and follow-up on fair housing complaints. If resolution was not obtained for any complaints, refer complaint to HCD to ensure that affordable housing lawsare actively enforced. • Biennial fair housing update to the City Council.

City of Avalon General Plan Housing Element Housing Plan Page 22 • Meet with developers annually to identify special housing needs in the City (i.e., housing for seniors or persons with disabilities) and encourage development of special needs housing thataccesses the population of Avalon. •Work with kocal or2anizations annually to encourage. eparid, and pubticizetafrt,qusing renuirements as part of programs that provide rental assistance to Lower income households. • Actively recruiting residents fcr_nninhhnrhnnAr nfrnnrntr.fA nnprb, fg I I Lprticipate on boards,
committees, and other local gpyççnment bodies as positioris are made available due to the regular agppintment process or vacancies, on at least a biennial basis. .—Provide education to the community on the importance of participating in the ianning and decision-making process and completing Census questionnaires at least annually through theCity’s monthly newsletter. .
• Coordinate with SCE to improve existing water system and expand capacity to accommodate new development of housing lower income households.
of outreach methods, including but not limited to,
md other gathering places (e.g., churches, civic and public buildings, food service est?hlichrRntcLthrplrhout the community
•By June 2023, designiñd implement an internal City procedure to annually evaluate fair housing education and outreach efforts and make adjustments within six months.

Housing and Mobility EnhancementNew Housing Choices and Affordability in High Opportunity AreasPlace-Based Strategies for Community Preservation and Revitalization City of Avalon General Plan Housing Element Housing Plan Page 23 • dfress a sixul
so1in ((‘(k \‘iOI
On a quarterly basis aIgct community revitaLization efforts to areas with higher code enforcement issues and with lowerppvrtunitieJcvcianji_dev p5tateges, annually, toenhance mobihty and reduce displacement. rrQDAfl ongoing basis, and at [east annually, review Land use and pLannintroposaIs to ensure that the City is reoiacirg segregated hying patterns with integrated and bahççivincDatterns, where aDDlicabLe and feasibte. and working to transform raciaLly and ethnicfly concentrated areas of Dovertv into areas of oooortunitv without disDlacement. .

Displacement Protection
• Continue to imDLement the City’s nontransien: reota. rsoection oro2ram at iou itui nilul:
interotion/ Segregation
- Work with local oreanizat!or.: to ocorra;c. po rorocn as port of rcgramo tho’ r”!rt:
nan en;oin; bosis, ond at icr’ —oaLv. rowo”aoo usc ard punning pr:o:aV_ te ‘hat the city roocin; :ogro;oto IHo; pate+toto;tcd an “rcottons, whore rcob½ :d foo:!b’c, oo4e$eto trnsforrn rriaLL; anu uuinconcentrated areas ui . L. iIw areas of opportunity .‘.fthout dicp’ac’m..

Asses: to Opportunity
Targe: commu .. ._ .. orco: or an
trateeies to enhance mobit” oH n”c
-Acterooritirg ro:idoats from neighborhoods of concenlrotod po:o:ty to soro or pat’epateortooH ccm:oos. and other hca: gouromon: bothos no no ton: arc rodeovanabte cue to th guapprtcnt orooco: or .‘ocnocc:. . --04 —odueat4oz to tho oozir- ‘rfty on tb” impcrtzuee—ef pnrepag—+n the planrin; and Responsible Agency: PLanning Department; Los Angeles County Housing Authority Financing: CDBG fundsProgram Objectives: Improve fair housing opportunities and response to complaints through implementing above actions. Follow up on 100% of eompt-a4ntsAffirmatively further fair housing.

Timing: Timelines associated with specific actions are included in the description of the program or programs references elsewhere in this Housing Plan; Ongoing implementation and annual monitoring andreporting throughout the planning period.

City of AvaLon GeneraL Plan Housing Element Housing Plan Page 24

4. Quantified Objectives
Extremely Low Income 2
Low Income
State Law requires the Housing Element to include quantified objectives for the maximum number of units that can be constructed, rehabilitated or conserved. Policies and programs in the HousingElement establish the strategies to achieve these objectives. The City’s quantified objectives are described under each program, and represent the City’s best effort in implementing each of the programs. Assumptions are based on past program performance and funding availability, construction trends, Land availability, and future programs that wilt enhance program effectiveness and achievefull implementation of the City’s housing goals.

The primary obstacle to the development of new housing units in Avalon, at any income level, is the availability of domestic water. As discussed thoroughly in the Housing Element Background Report, there is a waiting list to receive a water allocation to serve the needs of new units in Avalon. TheCity will continue to work closely with Edison to strongly support the expansion of water availabilityin the City. It is the City’s objective to support expansion of the City’s affordable housing stock and support the development of all of its 27-unit RHNA allocation for 2021 -2029. However, it must be recognized that the City’s influence on these decisions is limited, and the City itself cannot control the increase in water allocations to the Island. Historic patterns of development indicate that despite having sufficient vacant land available for development, and a supportive development partner in the Santa Catalina Island Company, availability of water will Limit development in the City to Levels below its RHNA.

The new construction objectives shown in the table below represent a portion of the City’s overall RHNA for the 2021-2029 planning period for all income levels. The objective identified for each income level is based on historic trends and patterns of development; units affordable to lowerincome households are historically more difficult to develop due to extremely limited available funding for affordable housing projects. Moderate- and above-moderate income units are more likely to be developed by the private market. All new development is Limited by the ability to secure asufficient water allocation.

The table below summarizes the City’s quantified objectives for housing during the 2021 -2029 planning period.TABLE 1: QLANTIFIED H0USNG OBJECTIVES: 2021-2029 2 New Conservationl
Construction Rehabilitation Preservation
Very Low Income 2 2
4 2
Moderate Income 4 2
Above Moderate Income 11* -
-2-2-2
-2
Total 23 8 -8
‘All II new above-moderate income units are located at Hamilton cove, already entitled, and hove received water allocations
There arc no affordable unita at rick of con,’crcion to market rate un!tr during the next 10 ycort There are no abovemoderate income units in need of conservation or preservation assistance.

City of Avalon General Plan Housing Element Housing Plan Page 25 This page intentionally left blank.

City of Avaton GeneraL Plan Housing Element Housing Plan Page 26 STATE OF CALIFORNIA - BUSINESS CONSUMER SERVICES AND HOUSING AGENCY GAVIN NEWSOM Gnwrnnr

DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENTDIVISION OF HOUSING POLICY DEVELOPMENT 2020 W. El Camino Avenue, Suite 500Sacramento! CA 95833(916) 263-291 11 FAX (916) 263-7453 www.hcdcagov
August 18, 2022
Susanna Gutierrez, Assistant Planner
Planning and Building Department
City of Avalon
P.O. Box 707
Avalon, CA 90704
Dear Susanna Gutierrez:RE: City of Avalon’s 6th Cycle (2021 -2029) Revised Draft Housing Element Thank you for submitting the City of Avalon’s (City) revised draft housing element received for review on August 2, 2022. Pursuant to Government Code section 65585, subdivision (b), the California Department of Housing and Community Development (HCD) is reporting the results of its review.

The revised draft element meets the statutory requirements described in HCD’s April 12, 2022 review. The housing element will comply with State Housing Element Law (Article 10.6 of the Gov. Code) when it is adopted, submitted to and approved byHCD, in accordance with Government Code section 65585.For your information, pursuant to Assembly Bill 1398 (Chapter 358, Statutes of 2021), as the City failed to adopt a compliant housing element within 120 days of the statutorydeadline (October 15, 2021), Program 15 (Adequate Sites for Lower Income Households on Nonvacant and Vacant Sites Previously Identified) to rezone 1.52 acres to accommodate 30 units of the lower income regional housing needs allocation must be completed no later than one year from the statutory deadline. Otherwise, the local government’s housing element will no longer comply with State Housing Element Law,and HCD may revoke its finding of substantial compliance pursuant to GovernmentCode section 65585, subdivision (i). Please be aware, if the City fails to adopt acompliant housing element within one year from the statutory deadline, the elementcannot be found in substantial compliance until rezones to accommodate a shortfall ofsites pursuant to Government Code section 65583, subdivision (c), paragraph (1),subparagraph (A) and Government Code section 65583.2, subdivision (c) arecompleted.

Susanna Gutierrez, Assistant Planner

Page 2 ends

Public participation in the development, adoption and implementation of the housing element is essential to effective housing planning. Throughout the housing element process, the City must continue to engage the community, including organizations thatrepresent lower-income and special needs households, by making information regularly available while considering and incorporating comments where appropriate. Please beaware, any revisions to the element must be posted on the local government’s websiteand to email a link to all individuals and organizations that have previously requested notices relating to the local government’s housing element at least seven days before submitting to HCD.

Several federal, state, and regional funding programs consider housing elementcompliance as an eligibility or ranking criteria. For example, the CalTrans Senate Bill(SB) 1 Sustainable Communities grant; the Strategic Growth Council and HCD’s Affordable Housing and Sustainable Communities programs; and HCD’s Permanent Local Housing Allocation consider housing element compliance and/or annual reportingrequirements pursuant to Government Code section 65400. With a compliant housing element, the City meets housing element requirements for these and other funding sources.

For your information, some general plan element updates are triggered by housing element adoption. HCD reminds the City to consider timing provisions and welcomes the opportunity to provide assistance. For information, please see the TechnicalAdvisories issued by the Governor’s Office of Planning and Research at:
https://wwvv.opr.ca.gov/planninq/general-plan/quidelines.html.HCD appreciates the efforts demonstrated in preparation of the City’s housing element and looks forward to receiving the City’s adopted housing element. If you have any questions or need additional technical assistance, please contact Jamillah Williams, of our staff, at Jamillah.Williams(ähcd.ca.gov.

Sincerely,
Paul McDougall
Senior Program Manager
Addendum to the City of Avalon General
Plan Final Environmental Impact Report
2021-2029 Housing Element Update
Prepared for:City of City of Avalon
Planning and Building Department
410 Avalon Canyon Road
Avalon, CA 90704
Prepared by:

De Novo Planning Group
180 E. Main Street, Suite 108
Tustin, CA 92780
De Novo Planning G
...i...
roup
August 2022
A Land Use Planning, Design, and Environmental Firm
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Table of Contents1 INTRODUCTION 1-1

1.1 PURPOSE AND BACKGROUND 1-11.2 CEQA REQUIREMENTS 1-11.3 INCORPORATION BY REFERENCE 13 2 ADDENDUM FINDING 2-13 DESCRIPTION OF THE PROPOSED PROJECT 3-1

3.1 BACKGROUND 3-1

3.2 PRO.ECT LOCATION AND SrTING 3-13.3 CHARACTERISThCS OF PROPOSED PROJECT REVISIONS/ADOFIONS 3-4 4 ENVIRONMENTAL ANALYSIS 4-1

4.1 AESNEThCS 4-24.2 AGRICULTURE AND FORESTRY RESOURCES 4-54.3 AIR QUALrY 4-74.4 BIOLOGCAL RESOURCES 4-104.5 CULTURAL RESOURCES 4-1446 ENERGY 4-174.7 GEOLOGY AND SOILS 4-19

4.8 GREENHOUSE GAS EMISSIONS 4-23

4.9 HAZARDS AND HAZARDOJS MATERIALS 4-254.10 HYDROLOGY AND WATER QUALITY 4-29

4.11 LAND USE AND PLANNING 4-36

4.12 MINERAL RESOURCES 4-384.13 NOSE 4-394.14 PCPULAT:ON AND HOUSING 4-424.15 PURLIC SERVICES 4.444.16 RECREAION 4-484.17 TRANSPORTATION 4-49

4.18 TRIBAL CULTURAL RESOURCES 4-52

4.19 UTILITIESAND SERVICE SYSTEMS 4-544.20 WILDFIRE 4-574,21 MANDATORY FINDINGS OF SIGNIFICANCE 4-59 Tables and Figures
Table 1: AValon 2030 GP/LCP Land Use Districts 3-2
Table 2: Avalon 2030 GP/LCP Expected Residential Development Capacity 3-3Table 3: Progress Towards the RHNA 3-6Table 4: Comparison of RHNA Candidate Sites Realistic Capacity and RHNA 3-7 City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
1 INTRODUCTION

1.1 PURPOSE AND BACKGROUND
The City of Avalon is the Lead Agency under the California Environmental Quality Act (CEQA). OnJuly 16, 2013, the City Council adopted the 2030 Avalon General Plan/Local Coastal Plan (2030 GP/LCP), including the Housing Element, and certified the 2030 General Plan/Local Coastal Plan Final Environmental Impact Report (General Plan/LCP FEIR) (State Clearinghouse #2011091042)) The City now proposes the current 2021-2029 Housing Element for the 6tb cycle (referenced herein as “Modified Project” or “Project”). The Modified Project involves minor changes/additions to theHousing Element in compliance with State Housing Element Law Government Code Sections65580-65590.1.

Following preliminary review of the proposed Housing Element Update, the City of Avalon, as Lead Agency, has determined that the proposed Project is subject to CEQA (Public Resources Code [PRC] Sections 21000-21177). This Addendum to the General Plan/LCP FEIR has been prepared by theCity to demonstrate that the proposed Housing Element Update does not meet the conditionswarranting preparation of a Subsequent or Supplemental EIR, as the General Plan/LCP FEIR fullyanalyzed the potential environmental impacts associated with the Housing Element Update, asdescribed further.

1.2 CEQA REQUIREMENTS
The purpose of this Addendum is to analyze any potential differences between the impacts identified in the General Plan/LCP FEIR and those that would be associated with the proposed Project. Pursuant to provisions of CEQA and State CEQA Guidelines the City is the Lead Agency charged with the responsibility of deciding whether to approve the Project. As part of its decisionmaking process, the City is required to review and consider whether the proposed Project wouldcreate new significant impacts or significant impacts that wou1d be substantially more severe thanthose disclosed in the General Plan/LCP FEIR.Additional CEQA review beyond this Addendum would only be triggered if the Project created new significant impacts or impacts that are more severe than those disclosed in the General Plan/LCP FEIR used to approve the Avalon General Plan in 2013. To use an Addendum as the appropriate CEQA document for the proposed Project, the City must find that major revisions to the General Plan/LCP FEIR are not necessary and that none of the conditions described in State CEQAGuidelines Section 15162 calling for the preparation of additional CEQA documentation has occurred.In accordance with the State CEQA Guidelines, prior to approving further discretionary action anddepending upon the situation, the lead agency must generally either: (1) prepare a SubsequentErR; (2) prepare a Supplemental EIR; (3) prepare a Subsequent Negative Declaration; (4) preparean Addendum to the EIR or Negative Declaration; or (5) prepare no further documentation. (SeeState CEQA Guidelines, § 15162 — 15164.) State CEQA Guidelines Section 15162 states:
city council Resolution 13-14.

Introduction 1-1
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
When an FIR has been certified or a negative declaration adopted for a project, no subsequent FIRshall be prepared for that project unless the lead agency determines, on the basis of substantialevidence in the light of the whole record, one or more of the following:
(1) Substantial changes are proposed in the project which will require major revisions of the previous FIR or negative declaration due to the involvement of new significantenvironmental effects or a substantial increase in the severity of previouslyidentified significant effects; (2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous FIR orNegative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significanteffects; or (3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previousFIR was certified as complete or the Negative Declaration was adopted, shows any of the following:
(A) The project will have one or more significant effects not discussed in the previous FIR or negative declaration;
(B) Significant effects previously examined will be substantially more severe than shown in the previous FIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or moresignificant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
(D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

Section 15164 of the State CEQA Guidelines explains when an Addendum to an EIR is appropriate.Per this section, where some changes or additions are necessary to the previously certified FIR,but none of the conditions described in Section 15162 calling for the preparation of a subsequentFIR (as described above) have occurred, then the lead agency is directed to prepare an Addendum to the certified FIR (State CFQA Guidelines, § 15164). Further, the Addendum should include a “brief explanation of the decision not to prepare a subsequent FIR pursuant to Section 15162,” and that “explanation must be supported by substantial evidence” (State CEQA Guidelines, § 15164 [e]). The Addendum need not be circulated for public review but may simply be attached to the certified FIR (State CFQA Guidelines, § 15164 [c]).

Introduction 1-2
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

1.3 INCORPORATION BY REFERENCE
The documents outlined below, which were utilized during preparation of this Addendum and are a matter of public record, are hereby incorporated by reference.

Avalon 2030 General Plan/Local Coastal Plan
The City Council comprehensively adopted the City of Avalon 2030 General Plan/Local Coastal Plan on July 16, 2013. The General Plan is a comprehensive legal document that sets forth the City’s long-range planning policies and serves as the guiding document for achieving the community’s vision for the future. The General Plan contains goals, policies, and programs to guide land use and development, and is organized into seven mandatory “elements” in accordance with California Government Code Section 65302: Land Use, Housing, Circulation, Conservation, Open Space, Noise, and Safety. For the 2030 Avalon General Plan/Local Coastal Plan, these elements are organized into Land Use, Open Space, Conservation, Housing, Circulation, Safety, and Noise Elements. The 6th Cycle Housing Element Update is the subject of this Addendum Land Use Element Table 2-2 presents the Land Use Plan’s buildout potentials and assumptions.Full implementation of the General Plan is anticipated to result in a total of 4,821 permanent residents and 2,920 dwelling units.

Avalon General Plan Final EIR
The City Council adopted the General Plan/LCP FEIR on July 16, 2013. The General Plan/LCP FEIR provides a program-level analysis of the general environmental impacts resulting from the development of land uses and implementation of policies established within the 2030 GeneralPlan/Local Coastal Plan. The General Plan/LCP FEIR’s analysis is based on the change between development under existing conditions (at the time of document preparation) and those projected for likely development in accordance with the General Plan by theoretical expected developmentcapacity. Based on General Plan/LCP FEIR Table 2-3, the General Plan/LCP FEIR assumed and analyzed the environmental impacts resulting from the following2: approximately 1,041 additional persons and 631 additional dwelling units. The City’s projected population resulting from full implementation of the General Plan is 4,821 persons. The General Plan/LCP FEIR concluded that full implementation of the General Plan would result in less than significant impacts or less than significant impacts with the implementation of mitigation measures for all issue areas analyzed.

The General Plan/LCP FEIR’s background and policy information and environmental impact conclusions are cited throughout this Addendum.

Avalon Municipal Code
The City of Avalon Municipal Code consists of the City’s regulatory and penal ordinances, and certain administrative ordinances. The City’s Zoning Ordinance is codified into Title 9, Planning andZoning. The purpose of the Zoning Ordinance is: to encourage, classify, designate, regulate,restrict, and segregate the highest and best location and use of buildings, structures, and land to serve the needs of residences, commerce, industry, and other purposes in appropriate places; to These numbers represent the expected net change in Planning Area Totals from existing 2012 (baseline) to expected development capacity, as calculated in the 2030 General Plan/Local Coastal Plan, Introduction 1-3
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
regulate and limit the height, number of stories and size of buildings and other structures, hereafter designed, erected or altered; to regulate and determine the size of yards and other open spaces;to regulate and limit the density of population; to facilitate adequate provisions for community utilities, such as transportation, water, sewage, schools, parks and other public requirements; tolessen congestion on streets, to promote the public health, safety, welfare and general prosperity with the aim of preserving a wholesome, serviceable and attractive community.

Introduction 1-4
City of Avalon J 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
2 ADDENDUM FINDING
As detailed herein, on the basis of substantial evidence in the light of the whole record, a Subsequent or Supplemental EIR is not appropriate for the proposed Project because none of the criteria permitting such a document under State CEQA Guidelines section 15162 are met.

The 2021-2029 Housing Element Update would result in no new significant impacts that were not analyzed in the General Plan/LCP FEIR, nor would the proposed Project cause a substantial increase in the severity of any previously identified environmental impacts. The potential impacts associated with the proposed Project would either be the same or less than those described in the General Plan/LCP FEIR. In addition, there are no substantial changes to the circumstances under which theproposed Project would be undertaken that would result in new or more severe environmentalimpacts than previously addressed in the General Plan/LCP FEIR, nor has any new informationregarding the potential for new or more severe significant environmental impacts been identified.

Therefore, in accordance with Section 15164 of the State CEQA Guidelines, this Addendum to the previously certified General Plan/LCP FEIR is the appropriate environmental documentation for the proposed Project. In taking action on any of the approvals, the decision-making body must consider the whole of the data presented in the Final EIR and the previously adopted Mitigation Monitoring and Reporting Program (MMRP).On February 10, 2022, the City Council adopted the Addendum in connection with the adoption of the Housing Element. After adoption of the Housing Element, the City received comments fromthe California Department of Housing and Community Development (HCD). The adopted Housing Element was amended in response to HCD’s comments. The 2021-2029 Housing Element Update, as revised in response to HCD’s comments, does not create any new program or policy that wouldpermit residential development where it is not otherwise permitted. As such, it was determined that the revisions to the 2021-2029 Housing Element Update do not result in any new or greaterenvironmental impacts than were previously analyzed, disclosed, and mitigated, and that it is stillappropriate for the City to rely on the Addendum. It was further determined that a supplementalor subsequent EIR do not need to be prepared pursuant to CEQA Guidelines Section 15162.

Addendum Finding 2-1
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEW
3 DESCRIPTION OF THE PROPOSED PROJECT

3.1 BACKGROUND

3.1.1 HOUsING ELEMENTS AND REGIONAL HOUSING NEEDS ALLOCATION The Housing Element is a State-mandated element of the General Plan. The City of Avalon must update its Housing Element every eight years. Updates to the Housing Element must meet therequirements of California Government Code Sections 65580-65589. The purposes of the Housing Element are to identify the community’s housing needs; to state the community’s goals and objectives with regard to housing production, rehabilitation, and conservation to meet those needs;and to define the policies and programs that the community will implement to achieve the statedgoals and objectives.State law requires that the City accommodate its “fair share” of regional housing needs, which are assigned by the Southern California Association of Governments (SCAG) for all jurisdictions in theSCAG region (counties of Imperial, Los Angeles, Orange, Riverside, San Bernardino and Ventura).SCAG established the 2021-2029 Regional Housing Needs Plan (RHNP) to assign each city and the unincorporated county in the region its fair share of the regional housing need based on a number of factors established by State law (Government Code Section 65584) and regional housing burdens and needs. The objectives of the Regional Housing Needs Allocation (RHNA) are:
• Increase housing supply and the mix of housing types;• Promote infill, equity, and environment; • Ensure jobs housing balance and fit;• Promote regional income equity; and• Affirmatively further fair housing.

Beyond the income-based housing needs established by the RHNA, the Housing Element must also address special needs groups; such as seniors, persons with disabilities including developmentaldisabilities, single female parents, large families, farm workers, and homeless persons.

3.2 PROJECT LOCATION AND SETTING
The City of Avalon (City) is a unique, tourist-oriented community located on the island of Santa Catalina, 22 miles southwest of the Los Angeles and Long Beach Harbors; refer to Figure 1, Regional Location. Santa Catalina tsland is 76 square miles in area, with approximately 88 percent of the land comprised of a conservancy area maintained in its natural state in perpetuity. TheGeneral Plan planning area for Avalon encompasses approximately 7.07 square miles, which includes the corporate City limits of approximately 2.81 square miles, or 1,798 acres of land, as well as three areas of unincorporated Los Angeles County that lie adjacent to the City and may be considered for future annexation. These unincorporated areas (known in this document as the proposed “Expansion Areas”) total about 2,727 acres and include a landfill and quarry area as well as open space. The City strives to serve the needs of its permanent residents and the tourist population while protecting the natural resources that make it a popular destination, Description of the Proposed Project 3-1
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
The 2030 GP/LCP Land Use Element designates the general distribution and intensity of uses of the land for housing, business, industry, open space, education, public buildings and grounds,waste disposal facilities, and other categories of public and private use (Table IT-i of the Land Use Element). Table 1, Avalon 2030 GP/LCP Land Use Districts, summarizes the land uses identified in the 2030 GP/LCP.

Adjacent to current City limits, the 2030 GP/LCP identifies three potential “annexation areas”:
• Expansion Area No. 1 — This area is located in a landfill and quarry area south of Pebbly Beach. Within this area, light industrial uses are planned, with the potential to transition over time to more visitor-serving uses as part of a Pebbly Beach Specific Plan Overlay District.
• Expansion Area No. 2 — This area consists of various parcels between Hamilton Cove and the Divide Road. This area would facilitate Resort/Recreational land uses. • Expansion Area No. 3 — This area is located between the City limits separating Pebbly Beach and the eastern boundary of Avalon Canyon. More open uses within City limits would occur here.

The Land Use Element is primarily implemented by the City’s Zoning Ordinance, which specifies districts and performance standards for various types of land uses described in the General Plan.

Each General Plan land use designation has a corresponding zone or zones that implement andregulate the intent of the land use. The zone districts specify the permitted uses for each category and applicable development standards.

The General Plan identifies the expected development capacity associated with the distribution of planned land uses specified in the Land Use Plan (Table 11-2 of the Land Use Element). Table 2, Avalon 2030 GP/LCP Expected Residential Development Capacity, summarizes the expecteddevelopment capacity for residential uses within Avalon based on reasonable density assumptionsfor the City and SOl.

Table I: ,4valon 2030 GP/LCP Land Use Districts
Land Use Designation Description
ResidentialLow Density Residential (LD-R) The LD-R designation accommodates detached single family detached housing.

Medium Density Residential (MD-R) The MD-R designation accommodates detached single family housing units and two dwelling units per lot or parcel.

High Density Residential (HD-R) The HD-R designation accommodates multi family dwelling units and single family dwelling units.

High Density Residential - The HD-R-CH designation accommodates only residential development, includingCommunity Housing (HD-R-CH) multi family dwelling units and single family dwelling units.

Commercial
Commercial (C) The C designation accommodates general retail and commercial services and offices.

Special Commercial (SC) The SC designation accommodates small scale residential uses, neighborhood retail and services, as well as structures which contain commercial uses on the ground floor and residential uses above, Appropriate uses include retail sales (excluding food and beverage), and personal and professional sales.

Description of the Proposed Project 3-2
City of Avalon 2021-2029 Housing Element Update
Public
Addendum to the General Plan/LCP FEIR
Public (P) The P designation is intended for areas vital to public services. Principal uses allowed include schools, hospitals, parks. libraries, parking lots and supporthousing.

IndustrialLight Industrial (LI) The LI designation is intended for areas vital to moderate industrial services.

Principal uses alowed include infrastructure light manufacturing, assembly. faorication, warehouses, and corporate yards.

Pebbly Beach Specific Plan Overlay The PB-SP overlay identifies the Pebbly Beach area for eventual development ofDistrct (PB-SP) a specific plan. The area is currently utilized for light industrial purposes. In the near term, the area wilt continue to be ‘used for industrial uses. However, if it is determined that such uses are no longer necessary or viable a specific plan is tobe develooed to guide the possible eventual transition to other uses thattake advantage of this area’s coastal location. It is anticipated that new landsuses may include visitor-serving facilities such as a new puolic dock/ferryterminal, commercial retail, restaurants, hotels/motels, andior recreational facilities that serve both residents and visitors
Lover’s Cove-Specific Plan Overlay The LC-SP overlay identifies the area above Lover’s Cove and surrounding areaDistrict (LC-SP) for eventual development of a specific plan. This area is currently undeveloped.

However, if development is anticipated in the future, a specific plan is to be developed to guide the possible eventual transition to other uses that take advantage of this area’s views and proximity to visitor services. It is anticipated that the area may be utilized for visitor serving facilities such as a hotel, spa. orsocial and educational facility Recreation/Open Space
Resort Recreational High Density The RR-HD designation accommodates a variety of uses associated with the resort (RR-HD) character of Avalon. Appropnate land uses include hotels, inns and lodges, as well as parks and mobile home parks.

Resort Recreational Low Density The RR-LD designation accommodates a variety of uses associated with the resort(RR-LD) character of Avalon and also accommodates single family housing units. Allowed uses include single family detached housing, hotels, inns and lodges, as well asparks and mobile home parks.

Open Space (OS) The OS designation applies to lands under public or private ownership whose primary purpose is the provision of active and/or passive recreation, the protection of public health and safety. preservation of sensitive environmental resources. or resource management.

Source: City of Avalon General Plan Land Use Elemenf, Table 2-2.

Table 2: 4 va/on 2030 GP/LCP Expected Residential Development Capacity Type Existing* Year 2O3O Net Change
Population (Permanent 3,780 4,821 1.041 (22%)Residents)Permanent Housing Units 2.289 2.920 631 22%) Source: City of Avalon General Plan Land Use Elemenl, Table 2-3. * California Department of Finance. 2012.“Estimated number in the year 2030 based on predicted growth for the yea,’ 3030 based on the SCAG 2012—2035 RTP/SCS Growth Forecast for Avalon, adopted April 2012. J Description of the Proposed Project 3-3
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

3.3 CHARACTERISTICS OF PROPOSED PROJECT

REVISIONS/ADDITIONS
The project analyzed in this Addendum involves the 2021-2029 Housing Element Update. The proposed amendment would not modify the City of Avalon General Plan Land Use Map, land use designations, or intensities/densities identified within the General Plan Land Use and Community Design Element. No changes to the maximum development potential approved for the GeneralPlan and analyzed in the General Plan/LCP FE would occur with the proposed amendment.

3.3.1 HousiNG ELEMENT
In compliance with State Housing Element Law requirements, the City of Avalon has prepared the2021-2029 Housing Element (Project) to:
• Provide goals, policies, quantified objectives and scheduled programs to preserve, improve and develop housing
• Identify and analyze existing and projected housing needs for all economic segments of the community
• Identify adequate sites that are zoned and available within the 8-year housing cycle to meet the City’s fair share of regional housing needs at all income levels • Affirmatively further fair housing• Be certified (approved) by the State Department of Housing and Community Development (HCD) as complying with State law
• Be internally consistent with other parts of the General Plan Housing Element Organization
The proposed Housing Element Update covers the October 15, 2021 through October 15, 2029 planning period and is comprised of the following components:Part 1: Housing Plan Part 1 of the 2021-2029 Housing Element is the City’s “Housing Plan”, which includes the goals, policies, and programs the City will implement to address constraints and needs. The City’s overarching objective is to ensure that decent, safe housing is available to all current and futureresidents at a cost that is within the reach of the diverse economic segments which comprise Avalon. The Housing Plan includes only minor modifications to the City’s current Housing ElementGoals and Policies. The Housing Plan includes a number of new programs to address State housing law including future required updates to the Avalon Municipal Code, new programs to support affirmatively furthering fair housing, and tracking and reporting requirements for Housing Sites.

Part 2: Background Repor:Part 2 of the 2021-2029 Housing Element is the “Background Report” which identifies the nature and extent of Avalon’ housing needs, including those of special populations, potential housing resources (land and funds), potential constraints to housing production, and energy conservationopportunities. In addition to identifying housing needs, the Background Report also presents information regarding the setting in which these needs occur. The Background Report Description of the Proposed Project 3-4
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEW
comprehensively updates the background context and conditions identified in the City’s current Housing Element.

Appendix A: Housng Sftes Inventory
The Housing Element must include an inventory of land suitable and available for residential development to meet the City’s regional housing need by income level. The California Department of Housing and Community Development (HCD) requires that the Housing Sites Inventory be prepared using a State-approved format, included as Appendix A. No land use changes areproposed to accommodate the City’s Regional Housing Needs Allocation (RHNA). All sites identified in the City’s Housing Sites Inventory are currently identified for new development consistent with the potential development capacities identified in Appendix A.

Appendix B: Public Engagement Surnrna’yAs part of the Housing Element Update the process, the City hosted numerous opportunities for the community and key stakeholders to provide feedback on existing housing conditions, housing priorities, priority areas for new residential growth, and topics related to fair housing. Public engagement was facilitated in both English and Spanish to further engage the Avalon community.

Public participation played an important role in the refinement of the City’s housing goals andpolicies and in the development of new housing programs, as included in Part 1: Housing Plan. Thepublic’s input also helped to validate and expand upon the contextual information included in Part2: Background Report. The City’s efforts to engage the community in a meaningful and comprehensive way are summarized in Appendix B,
Capacity to Meet Regional Housing Needs
As determined by SCAG, the City of Avalon’ fair share allocation (RHNA) is 27 new housing unitsduring this planning cycle. This includes: eight (8) units affordable to extremely/very low income households; five (5) units affordable to low income households; three (3) units affordable tomoderate income households; and 11 units affordable to above moderate income households.

State Income Limits which are used to determine affordability levels are set annually by theCalifornia Department of Housing and Community Development.

Pogress Towards the RHNA
RHNA uses June 30, 2020 as the baseline for growth projections for the 2021-2029 planning period.

Jurisdictions may count toward the RHNA housing units that have been developed, are under construction, and/or have received their building permits after June 30, 2020. Since this time, nine(9) housing units have been developed, are under construction, or have received their buildingpermits in Avalon; these units are part of the Hamilton Cove development and expected to be affordable to above-moderate income households. Jurisdictions may also count projects that areapproved/entitled but not yet built or under construction. Seven (7) units have been approved/entitled and are expected to be developed within the planning period; these units are part of the Hamilton Cove development and are expected to be affordable to above-moderateincome households. Based on this progress, the City has already achieved approximately 60 percent of its overall RHNA with housing units constructed, under construction, or approved/entitled or under review (16 units); all of these units are in the above-moderate incomecategory. With these units taken into account, the City has fulfilled its allocation of above-moderate Description of the Proposed Project 3-5
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General PIan/LCP FEIR
income units and has a remaining RHNA of 16 units (eight extremely low! very low income units, five low income units, and three moderate income units).

Table 3: Progress Towards the RHNA
Status Extremely Low Moderate Above TOTAL
LowiVery Moderate
Low
RHNA Allocation
Constructed, UnderConstruction/Permits Issued(Since 6/30/2021) Units Approved/Entitled
Remaln!ng Allocation
Source: City of Avalon, 2021, SCAG, 2021
Residential Stes Inventory to Accommodate Remaining RHNA The City has sufficient land appropriately zoned for residential uses throughout the community to accommodate its remaining RHNA (16 units) for the 2021-2029 planning period. The City ofAvalon’s 6th Cycle residential sites fall into two categories:
1) Accessory dwelling units (ADUs). ADUs are allowed on any lot that is zoned for singlefamily or multifamily dwelling residential use. The City of Avalon did not approve any ADUs in 2018 or 2019. However, once the City updated and began implementing itsADU Ordinance, three ADUs were approved and permitted in 2020. The City hasassumed an average of one ADU every two years for the eight (S) year planning period, for a total projection of eight (4) units.
2) Vacant Catalina Island Company-Owned Property Zoned for Residential. One partically vacant site owned by the Catalina Island Company, Tremont Street, is included as the most appropriate site to accommodate the City’s remaining RHNA. The site could yield a capacity of at least 24 units during the 2021-2029 planning period.

Description of the Proposed Project 3-6
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Table 4: Comparison of RHNA Candidate Sites Realistic Capacity and RI-INA RHNA 13 3 11 27
Credits 0 0 16 16
Remaining RHNA 13 3 0 (surplus of 5) 16
after Credits
AppliedADUs 0 4 0 4
Tremont Street 24 0 0 24Total Site Strategy 24 4 0 28Capacity Total Capacity for 24 4 16 44the 6th Cycle
(Credits andSites)Surplus 11 1 5 17
Summary of Housing Element ModificationsAs previously noted, State law requires that the Housing Element be reviewed and updated not less than every eight years, in order to remain relevant and useful, and reflect a community’s changing housing needs. The proposed Housing Element Update involves minor changes/additionsto the Housing Element and environmental conditions under which it would be implemented. Thefollowing summarizes the modifications to the Housing Element, as compared to the 2013-2021 Housing Element:

Goals, Policies, and Programs (Part 1: Housing Plan)
The City made minor modifications to various existing Goals and Policies included in the Housing Element to reflect the City’s current housing needs and State mandates. The 2021-2029 HousingElement proposes the following additions:
• Proposed Goal V.B: Increased affordable housing opportunities• Proposed Policy V-4: Education on property maintenance• Proposed Policy V-5: Public and private rehabilitation actions• Proposed Policy V-S: Innovative efforts in the development and financing of affordable and/or special needs housing
Homeownership for lower and moderate-income households
Fresh water resiliency and expanded availability
Collaboration to address infrastructure needs
Maintain adequate capacity to accommodate the RHNAPlans for development by private landowners Accessory and junior accessory dwelling units
By-right approval for qualified projects on previously used sitesReasonable accommodation Affirmatively further fair housing
Public input in the planning process
Status Lower Income (0- Moderate Income Above Moderate TOTAL 80% AMI) (81-120% AMI) Income (121%+ AMI)
• Proposed• Proposed• Proposed• Proposed• Proposed• Proposed• Proposed• Proposed• Proposed• Proposed Policy V-9:Policy V-12:Policy V-13:Policy V-iS:Policy V-i9:Policy V-20:Policy V-21:Policy V-26:Policy V-27:

Policy V-28:

Description of the Proposed Project 3-7
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
• Proposed Program• Proposed Program
• Proposed Program• Proposed Program• Proposed Program
• Proposed Program• Proposed Program
• Proposed Program• Proposed Program• Proposed Program• Proposed Program • Proposed Program
• Proposed Program
Background Information (Part 2: Background Report)
The Background Report of the Housing Element has been comprehensively updated to include current information. This section of the Housing Element includes: Introduction, Accomplishments Under 5 Cycle Housing Element, Housing Needs Assessment, Affirmatively Furthering FairHousing Analysis, Constraints, Housing Resources, and Dther Requirements.

Appendix A: Housings Sites Inventory
The City has updated its Housing Sites Inventory to demonstrate capacity to accommodate its 2021-2029 RHNA. The Housing Sites Inventory includes a list of sites appropriate to accommodate the RHNA at the appropriate densities and income levels and includes sites identified in the Current Housing Element designated for residential development consistent with the City’s General Plan and Zoning Ordinance. No land use changes are proposed as part of the 2021-2029 HousingElement.

Appendix B: Public Engagement Summary
The public engagement program conducted as part of the Housing Element Update project is summarized in Appendix B.
3: Nontransient Rental Inspection Program
4: Preservation of At-Risk Units
10: Identification of Adequate Sites13: Replacement of Affordable Units14: Accessory Dwelling Units15: Monitoring Potential Constraints 16: Monitoring Reasonable Accommodation Procedures17: Zoning Code Updates — Remove Constraints18: Prohousing Designation 19: Water Availability
21: Section 8 Housing Choice Vouchers22: Coordination on Homeless Issues23: Affirmatively Furthering Fair Housing Outreach and Coordination Description of the Proposed Project 3-8
Figure 1: Regional Location Map
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Project Location
Map images ropy,rght @2009 ESRI and its licensors.

All nghts reserved. Used by permission.

N
Basemap Soiree ESRI Data. 2034. and COFG. 2cC2.

A
Là.p cc Lanca3ltr C, PIn,dMt
,s.nenv. ‘r,SiabCiarlia . .-
0XI):r1_ j,f.
t. Los Angeles r.’ A,,*eifli CaeieM

RAG IFIG
OCEA N
Lc4,TB.SCh santa Asia ..,MtsrI’iel
C *
0 40 80 Miles

I I I I I
0c
San DIego..

Description of the Proposed Project 3-94
City of Avalon I 2021-2029 Housing Element Update
IL Avalon City Limits
n Sphere of Influence Boundary U C
Addendum to the Genera’ PIan/LCP FEIR
Figure 2: General P/an Planning Area

PACIFIC
OCEAN
isçerypmAdt14cusos &0g ESR!anu IcensoiiCOiZ 8!bn&
2Ot9 Los Argeles COL.’iy fl.paterf 0 tRegor.aflapwg
0 i,O 3200
I I I
Feet
Description of the Proposed Project 3-10
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEW
4 ENVIRONMENTAL ANALYSES
This Addendum has been prepared to determine whether the proposed Project would result in any new or substantially increased significant environmental impacts in comparison to the approvedproject as analyzed in the previously certified General Plan/LCP FEIR. This section of the Addendum provides analysis and cites substantial evidence that support’s the City’s determination that theproposed Project does not meet the criteria for preparing a subsequent or supplemental EIR under CEQA Guidelines Section 15162.

The scope of the City’s review of the proposed Project is limited by provisions set forth in CEQA and the State CEQA Guidelines. This review is limited to evaluating the environmental effectsassociated with the proposed Project to the General Plan Project as set forth in the FEIR. This Addendum also reviews new information, if any, of substantial importance that was not known andcould not have been known with the exercise of reasonable due diligence at the time the FUR was certified. This evaluation includes a determination as to whether the changes proposed by the Project would result in any new significant impacts or a substantial increase in a previouslyidentified significant impact.

The section is patterned after the CEQA Guidelines Appendix G Checklist and provides a summary of impacts associated with the proposed actions, as described in the FEIR, and includes an analysis of the potential impacts associated with the proposed 2021-2029 Housing Element Update. Thiscomparative analysis provides the City with the factual basis for determining whether any changes in the Project, any changes in circumstances, or any new information since the FEIR was certified would require additional environmental review or preparation of a Subsequent EIR or Supplemental EIR.

Environmental Analysis 4-1

4.1 AESTHETICS
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Except as provided in Public Resources Code Section 21099, would the project:a. Have a substantial adverse effect on a scenic vista?
b. Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings
within a state scenic highway?
c. In non-urbanized areas, substantially
degrade the existing visual character orquality of public views of the site and itssurroundings? (Public views are those that are experienced from publicly X
accessible vantage point). If the projectis in an urbanized area, would the projectconflict with applicable zoning and otherregulations governing scenic quality? d. Create a new source of substantial light
or glare which would adversely affect Xday or nighttime views in the area? General Plan/LCP FUR Conclusions
There are no officially designated scenic highways in the City of Avalon or the immediately surrounding unincorporated areas within Avalon’s identified Sphere of Influence. Therefore, the General Plan/LCP FEW concluded that implementation of the 2030 GP/LCP would not result in any impacts to scenic highways.

The urban fabric of Avalon is relatively compact, with approximately 80-90 acres of existing development already located within the valley floor and the immediately surrounding hillsides, with just over 700 additional acres surrounding the built environment as open space. This existing land use pattern is well established and therefore it is not anticipated to change drastically over time.

Avalon’s vision for managed growth under the proposed 2030 GP/LCP is centered primarily uponan infill development strategy, which would focus more intense and compact development within the already urbanized City Center in lieu of allowing significant expansion of development opportunities outward into Avalon’s hillsides, natural areas and open spaces. However, the potential future development opportunities envisioned within the 2030 GP/LCP and the land uses proposed as part of the 2030 GP/LCP Land Use Element have the potential to impact Avalon’s scenic resources and overall visual quality.

Environmental Analysis 4-2
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significant ImpactlNo
Requiring Requiring Significant Impact! Changes orMajot EIR Major EIR effects than Less Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds:
hnpact Preparation
With of an MND
ADplication or EIR
of
Mitigation
from FEIR
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Although it is Avalon’s desire to promote an infill development strategy as part of the 2030 GP/LCP,this strategy could potentially allow increases in building height to accommodate mixed-use development types. The mixture of commercial and visitor serving uses on the ground floor with residential uses above along with potential increases in building heights have the potential toimpact views of the waterfront from Avalon Bay and the City Center, views from the pedestrian/vehicle circulation routes, and views of the surrounding ridgelines from the City Center.

Increased building heights could also impact views of the Pacific Ocean from the surrounding residential properties, and from vista points surrounding resort/recreational uses. To help reduce potential impacts, the 2030 GP/LCP envisions only minor increases in building heights andincreased building heights only in areas set back substantially from the waterfront. The increased setbacks would help retain the current site lines to the beachfront, intermediate ridges, and the island divide ridges. The 2030 Land Use Element also envisions concentrating more intense mixeduse development along “corridors of intensity.” This would help to preserve views into and out of the City Center. Therefore, the General Plan FE concluded that implementation of the 2030 GP/LCP would be less than significant in this regard.

The 2030 GP/LCP proposes to change the existing land use designations within Avalon’s existing incorporated boundaries and within three expansion areas. These changes would potentially impact scenic resources and Avalon’s overall visual character. The proposed LD-R and RR-LD/RR-HD land use designations envision low density residential and resort/visitor serving development types in the hillside areas above the valley floor. The hillside areas are highly visible and predominantly comprised of steep slopes with limited areas to flat, unconstrained building areas. Therefore,project development would likely require substantial site grading, slope stabilization, roadconstruction, fire clearance, and other infrastructure development, which could alter topography, scar the hillsides, and remove natural biological resources. Therefore, future development envisioned in the 2030 GP/LCP has the potential to adversely affect the visual character of the hillsides and ridgelines.

The 2030 GP/LCP proposes annexation of three specific areas adjacent to Avalon’s existing city limits, Avalon’s scenic character is defined largely by striking views of the natural hillsides withinproposed annexation areas. Therefore, potential future development within the Pebbly BeachSpecific Plan (Annexation Area No.1) and the RR-LD land use designation (Annexation No. 2) have the potential to adversely impact Avalon’s scenic resources and its visual character. Potentially significant impacts would result from future development activities consisting of grading andvegetation clearance to establish suitable building pads, access roads, and other infrastructure. Tooffset potential impacts caused by potential future development in these areas, the 2030 GP/LCP Land Use Element proposes implementation measures, including undertaking studies to determine the feasibility of expanding the City’s Sphere of Influence, taking into account viewshed, watershedprotection, and infrastructure expansion opportunities, and collaborating with the Santa CatalinaIsland Company regarding the annexation of Expansion Areas. Conformance with theimplementation measures would help ensure that future development within the proposed annexation areas would not adversely affect scenic resources or Avalon’s visual character.

Therefore, as stated in the General Plan/LCP FEIR, future development would be guided by relevant 2030 GP/LCP policies, which would further ensure that impacts on Avalon’s scenic resources and its visual character would be less than significant.

Environmental Analysis 4-3
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
The potential future development of new or expanded structures and public facilities facilitated bythe 2030 GP/LCP could increase glare and increase the ambient nighttime lighting throughout the City. Increased glare could come from new development incorporating reflective exterior building materials, roofing materials, solar panels, and windows reflecting sunlight. Increased lighting could come from streetlights, parking lot/parking structure lights, and signage on businessestablishments. Within the City Center, the light and/or glare associated with new development would be less perceptible, as this area contains the most intense development and therefore lightand glare is already part of the area’s visual character. Nevertheless, potential future mixed-usedevelopment envisioned within the City Center could create new sources of light and glare,especially on the upper stories of new buildings or in developments that include new parking lots/structures or illuminated signage. Excessive outdoor lighting could also impact the darkerportions of Avalon, including the waterfront and the surrounding hillsides, which could impact thepublic enjoyment of the night sky. As stated in the General Plan/LCP FEIR, all lighting installed aspart of the 2030 GP/LCP would be subject to conformance with applicable Municipal Code requirements and guided by the Land Use Element. Where necessary, site-specific photometric studies would be undertaken as part of future development proposals to determine the extent of light and glare impacts on neighboring uses. Therefore, the General Plan/LCP FEIR concluded thatimplementation of the 2030 GP/LCP would not result in adverse light and glare impacts.

Analysis of Modified Project
There are no State scenic highways within the 2030 GP/LCP planning area (planning area); therefore, as concluded in the General Plan/LCP FEIR, no impacts would occur. The Project does not propose site-specific development, but is rather an update to a policy document to comply withnew laws and reinforce existing policy direction. The Housing Element Update proposes housingpolicies that would encourage housing production within the City. However, potential development of vacant and underutilized sites to accommodate the City’s RHNA would be consistent with theadopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. Future housingdevelopment, consistent with the Avalon General Plan, would be reviewed for consistency with policies and implementation measures (i.e., programs) aimed to reduce potential impacts to aesthetic resources and implement mitigation measures, as appropriate. The Housing Elementpolicies and programs would not have an impact on existing General Plan policies protecting aesthetic and visual resources. The Avalon General Plan includes policies and implementation measures to reduce potential impacts to aesthetic and scenic vista resources and to reduce impacts associated with light and glare as a result of new development.

The revisions to the Housing Element would not result in new aesthetic impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with General Plan Policies, there would be no new significant or significantly different impacts to aesthetics as a result of the proposed Project.

Environmental Analysis 4-4
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

4.2 AGRICULTURE AND FORESTRY RESOURCES
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant ImpactfNo
Requiring Requiring Significant Impacti Changes orMajor EIR Major EIR effects than Less Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds:

Impact Preparabon
With of an MND
Application orEIR
of
Mitigationfrom FEIR
Would the project:
a. Convert Prime Farmland, Unique
Farmland, or Farmland of StatewideImportance (Farmland), as shown on themaps prepared pursuantto the Farmland XMapping and Monitoring Program of the California Resources Agency, to nonagricultural use?
b. Conflict with existing zoning for
agricultural use, or a Williamson Act Xcontract?
c. Result in the loss of forest land or
conversion of forest land to non-forest Xuse?
d. Involve other changes in the existing
environment, which, due to their locationor nature, could result in conversion ofFarmland, to non-agricultural use orconversion of forest land to non-forestuse? General Plan/LCP FEIR Conclusions
There are no areas within Avalon currently utilized for agricultural or forestry activities.Accordingly, the City contains no Prime Farmland, Unique Farmland, or Farmland of Statewide Significance, as shown on maps provided by the Farmland Mapping and Monitoring Program of the California Department of Conservation. Further, there are no General Plan or Zoning designationsthat would support farming in Avalon. With regard to forest land, the 2030 GP/LCP contains a number of policies to preserve critical biotic resources such as oak woodlands and indigenous mature trees. Therefore, no impacts on Agriculture and Forestry Resources would occur fromimplementation of the 2030 GP/LCP.

Analysis of Modified Project
The Project does not propose site-specific development, but is rather an update to a policy document to comply with new laws and reinforce existing policy direction. Potential developmentof vacant and underutilized sites to accommodate the City’s RHNA would be consistent with theadopted land use policy and would not result in any changes to existing land uses or affect any parcels under a Williamson Act contract.

Environmental Analysis 4-5
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
The revisions to the Housing Element would not result in new agricultural or forestry resource impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with General Plan Policies, there would be no new significant or significantly different impacts to agriculture and forestry resources as a result of the proposed Project.

Environmental Analysis 4-6

4.3 AIR QUALITY
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Substantial Substantial Information No l.en Than No Impact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significaat ImpactlNo
Requiring Requiring Significant lmpactl Changes or
Major FIR Major EIR effects than Less Than Information
Revisions Revisions Previous EIR Significant Requiring Thresholds:

Impact Preparation
With of an MNO
Application or FIR
of
Mitigation
from FEIR
Would the project
a. Conflict with or obstruct implementation
of the applicable air quality plan?
b. Result in a cumulatively considerable
net increase of any criteria pollutant for
which the project region is non- Xattainment under an applicable federal or state ambient air quality standard?
c, Expose sensitive receptors to
substantial pollutant concentrations?
ci. Result in other emissions (such as those
leading to odors) adversely affecting a X
substantial number of people?
General Plan/LCP FEIR ConclusionsImplementation of the 2030 GP/LCP would be consistent with the 2007 Air Quality Management Plan (2007 AQMP) growth forecast and air quality control measures. Thus, the General Plan/LCPFEW concluded that impacts associated with compliance with the 2007 AQMP would be less than significant.

Development accommodated by the 2030 GP/LCP would result in the incremental increase in emissions. Long-term emissions associated with future development in Avalon in accordance with the 2030 GP/LCP are those associated with vehicle trips and stationary sources (electricity and natural gas). Emissions associated with individual projects, depending on project type and size, could exceed project-specific thresholds established by the South Coast Air Quality Management District (SCAQMD). However, such projects would be required to undergo independent projectlevel CEQA review and to include mitigation measures to address potentially significant projectlevel impacts. A goal of the 2030 GP/LCP is to “maintain air quality that meets state and federal standards.” The GP/LCP contains specific policies to preserve Avalon’s good air quality. In addition, it promotes infill development in the City Center and places an emphasis on pedestrian and bicycle travel. The City also strictly regulates vehicle use through a permitting system and land use parking approval process. The General Plan/LCP FEIR concluded that the 2030 GP/LCP and existing City vehicle policies would reduce vehicle use and vehicle miles traveled and result in a reduction infuel consumption and resulting in air pollutant emissions, which would reduce impacts to a less than significant level.

Environmental Analysis 4-7
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Construction activity that would be facilitated by the 2030 GP/LCP would cause temporaryemissions of various air pollutants. Ozone precursors NO and CO would be emitted by theoperation of construction equipment, while fugitive dust (PM1O) would be emitted by activities thatdisturb the soil, such as grading and excavation, road construction and building construction. The Los Angeles County portion of the South Coast Air Basin (SCAB) is designated non-attainment for ozone (State and Federal standards) and PM10 (State and Federal standards). Additionally, thepotential release of asbestos may occur during building demolition. tnformation regarding specific development projects, soil types, and the locations of receptors would be needed in order toquantify the level of impact associated with individual construction projects.Construction activity that could be facilitated by the 2030 GP/LCP could occur throughout Avalon.

However, it is anticipated that the areas where the highest amount of construction activity wouldoccur are within the City Center, up Avalon Canyon in the Resort Recreation — Low Density areas,and in Expansion Areas No. 1 and 2. Individual developments in these and other areas of the City would be subject to independent environmental review under CEQA. Depending upon thedevelopment type and size, maximum daily emissions associated with individual projects could potentially exceed SCAQMD significance thresholds.Future construction activity within Avalon would be subject to 2030 GP/LCP policies related to construction-related emissions. In addition, the SCAQMD has established rules 402 and 403, which require that air pollutant emissions not be a nuisance off-site and reduce the ambient entrainment of fugitive dust. Rule 403 includes best available control measures for all construction activity,contingency control measures for large operations, and conservation management practices forconfined animal facilities. Major categories addressed by Rule 403 to reduce fugitive dust includes earth moving, disturbed surface areas, unpaved roads, open storage piles, demolition, and othervarious construction activities. During construction, individual property owners, developers, orcontractors would be required to comply with applicable SCAQMD rules, which reduce temporaryconstruction-related air pollutant emissions. Further, if required, individual projects that couldoccur during the lifetime of the 2030 GP/LCP would be required to implement additional mitigation if site-specific analysis identifies the potential to exceed applicable thresholds. Adherence to applicable GP/LCP policies and SCAQMD rules would reduce potential construction-related impacts to a less than significant level.

The SCAQMD defines typical sensitive receptors as residences, schools, playgrounds, childcare centers, athletic facilities, long-term health care facilities, rehabilitation centers, convalescent centers, and retirement homes. When evaluating potential long-term air quality impacts to sensitive receptors, the SCAQMD is primarily concerned with high localized concentrations of CO.

Motor vehicles, and traffic-congested roadways and intersections are the primary source of highlocalized CO concentrations. Localized areas where ambient concentrations exceed federal and/or state standards for CO are termed CO “hotspots.” Implementation of the proposed 2030 GP/LCPwould not expose existing or future sensitive uses within the city to substantial CD concentrations.

The South Coast Air Basin is in attainment of state and federal CO standards and has been for several years. Background levels of carbon monoxide are generally low. Although CO is notexpected to be a major air quality concern in Los Angeles County over the planning horizon,elevated CO levels can occur at or near intersections that experience severe traffic congestion. The 2030 GP/LCP would not result in traffic congestion at intersections such that an exceedance of CO Environmental Analysis 4-8
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEtR
standards would occur. The General Plan/LCP concluded impacts would be less than significant inthis regard.

The proposed 2030 GP/LCP would facilitate development within the City Limits and into expansion areas. Some commercial and industrial uses developed under the 2030 GP/LCP may generate odor nuisance effects to the public. However, odors from new commercial and industrial uses would besimilar to the existing uses throughout the City and confined to the immediate vicinity of newbuildings. As such, significant odor impacts are not anticipated. Construction activity would also generate temporary airborne odors associated with the operation of construction vehicles (i.e.,diesel exhaust) and the application of architectural coatings. However, these odors are not generally considered to be especially offensive. Emissions would be temporary and would beconfined to the immediate vicinity of the construction site and activity. Required emission controls would be applied to all new development in the City. With appropriate controls, significant odor impacts would not be anticipated. The General Plan/LCP FEIR concluded that impacts would beless than significant in this regard.

Analysis of Modified Project
The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’s RHNA would be consistent with the adopted land use plan and would notresult in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. Future housing development, consistent with the AvalonGeneral Plan, would be reviewed for consistency with policies and programs aimed to reduce impacts to air quality as a result of new development, and would comply with applicable SCAQMDrules and requirements.

The revisions to the Housing Element would not result in new air quality impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with General Plan Policies, there would be no new significant or significantly different impacts to air quality as a result of the proposed Project.

Environmental Analysis 4-9
City of Avalon 2021-2029 Housing Element Update

4.4 BIOLOGICAL RESOURCES
Addendum to the General Plan/LCP FEIR
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant litipactlNo
Requiring Requiring Significant Impact! Changes orMajor EIR Major EIR effects than Less Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds:

Impact Preparation
With of an MND
Application or ER
of
Mitigation
from FEIR
Would the project:a. Have a substantial adverse effect either directly orthrough habitat modifications,on any species identified as a candidate,sensitive, or special status species inlocal or regional plans, policies, orregulations. or by the CaliforniaDepartment of Fish and Game or U.S.

Fish and Wildlife Service?
b. Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional x plans, policies, regulations or by the California Department of Fish and Gameor U.S. Fish and Wildlife Service? c. Have a substantial adverse effect on
federally protected wetlands as definedby Section 404 of the Clean Water Act(including, but not limited to, marsh. Xvernal pooi, coastal, etc.) through directremoval, filling, hydrologicalinterruption, or other means? d. Interfere substantially with the
movement of any native resident ormigratory fish or wildlife species or with x established native resident or migratory wildlife corridors, or impede the use of
native wildlife nursery sites?
e. Conflict with any local policies or
ordinances protecting biological xresources, such as a tree preservation policy or ordinance?
f. Conflict with the provisions of an
adopted Habitat Conservation Plan,
Natural Community Conservation Plan, X
or other approved local, regional, orstate habitat conservation plan? Environmental Analysis 4-10
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
General Plan/LCP FEIR Conclusions
The 2030 GP/LCP would primarily facilitate intensification of existing developed areas rather than development within undisturbed areas with the potential for special-status plant or animal species.

Nevertheless, some areas that that may contain sensitive plants and/or wildlife could potentially experience development. Implementation of the 2030 GP/LCP could introduce new developmenton land within the City that may encroach into areas that contain sensitive natural communities.

This could lead to the direct loss of this habitat and the wildlife that rely on it. It could also lead to the degradation of adjacent areas that were not directly disturbed, but would be subject to increased indirect impacts by being in close proximity to urban uses.

A variety of plant and animal species are present within the planning area. Some of the sensitive wildlife species that have been observed within the planning area include, but are not limited to, Santa Catalina Island fox and bald eagle. Development under the proposed 2030 GP/LCP couldalso result in the removal of mature trees that may serve as perching or nesting sites for migratory birds and raptors in both developed and undeveloped areas. During the project-level analysis of development proposed under the GP/LCP, project-specific mitigation, such as pre-construction surveys, may be necessary to ensure that development under the proposed 2030 GP/LCP date does not result in the “take” of such species as a result of vegetation removal.

The 2030 GP/LCP has identified goals that would aid in: (1) the preservation of critical biotic resources and enhance habitat value and biotic resource diversity within the Avalon area; (2)maintenance of the integrity of beaches, coves, harbor, and bays; (3) maintenance and enhance of Avalon’s unique ecology and environmental features for the long term enjoyment of residents and visitors; and (4) providing a high quality and functional mix of active and passive open spaces that are interconnected with coastal resources and the iconic hillsides. Specifically, Policies IV-1through IV-5 protect plant and wildlife species and habitat in the planning area by requiring: (1) new developments, including roads, maintain the biotic habitat value of riparian areas, oak woodlands, habitat linkages, and other sensitive biological habitats; (2) regulation of construction activities to eliminate potentially destructive practices that adversely affect environmentallysensitive areas; (3) preservation of the integrity of the riparian habitat areas, creek corridors, andother drainages that support biological resources and contribute to the overall health of the watershed areas through the preservation and restoration of native plants and the removal of invasive, exotic, and nonnative species; (4) preservation of existing mature indigenous trees,unless they are detrimental to public health and safety; and (5) the promotion of the planting of additional trees in developed locations. Plantings should include replacement of trees that are, orhave been, removed and new trees in locations where none are currently present. These policies providing protection to habitats containing candidate, and special status plant and wildlife speciesand would increase the level of protection of these plant and wildlife species within the City’s regulatory framework. Compliance with Federal Endangered Species Act (FESA), CaliforniaEndangered Species Act (CESA), and CEQA, as well as implementation of 2030 GP/LCP goals and policies discussed above, would reduce potential impacts on sensitive plant and wildlife species within the GP/LCP Area. In addition, compliance with federal and State regulations and their respective permitting processes would ensure protection of sensitive natural communities.

Therefore, the General Plan/LCP FEIR concluded that impacts would be less than significant in this regard.

Environmental Analysis 4-11
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
As described above, the 2030 GP/LCP land use map focuses mainly on intensification and reuse ofalready developed areas and would facilitate only limited development in undeveloped areas. Infill development would generally avoid direct impacts to riparian, wetland, and open water habitats.

However, the intensification of use of habitats along riparian corridors has the potential to be cumulatively significant and will require inspection on a project-by-project basis to ensureprotection of these resources. Future development in these and other locations that abut riparian corridors could potentially disturb riparian resources unless sufficient buffers and other mitigationactions are incorporated into these future projects. The type and magnitude of impacts would depend on what is actually proposed and, therefore, must be assessed on a case-by-case basis.In addition to the applicable State and federal regulations, the 2030 GP/LCP has identified as goals:(1) Preserve critical biotic resources and enhance habitat value and biotic resource diversity within the Avalon area; and (2) Maintain the integrity of beaches, coves, harbor, and bays.

Implementation of proposed GP/LCP Policies IV-1, 2, 3, and 10 would reduce or avoid impacts to riparian areas by ensuring cooperation with resource protection agencies, organizations, and conservation plans, and limiting or placing constraints on future development within identified Significant Ecological Areas (Upper Descanso Canyon, Haypress Area, Pebbly Beach CanyonSensitive Ecological Areas) or areas containing significant or rare biological resources.

An indirect impact to riparian habitat could result from the future development of existing vacant lands. The placement of development next to riparian habitats would disturb wildlife that rely on these areas for shelter and food and could also result in the degradation of these areas through the introduction of feral animals and contaminants that are typical of urban uses. Because federal regulations do not specifically address protection of riparian vegetation under the Section 404 permitting process, and the fact that the California Department of Fish and Wildlife (CDFW) Section 1600 Lake or Streambed Alteration Agreement is a negotiated agreement, some unmitigated loss of riparian resources may occur. Therefore, these regulations would not serve to fully protect and manage riparian habitat under future development. However, the aforementioned proposed GP/LCP policies would serve to regulate indirect impacts future development could have on riparian habitats. Further, implementation of 2030 GP/LCP policies and implementation actions would ensure that appropriate buffers and other protections for riparian resources and Sensitive Ecological Areas are implemented for individual projects. Therefore, the General Plan/LCP FEIR concluded that impacts to riparian, wetland, or open waters would be less than significant.

Concentrated wildlife movement through movement corridors or bottlenecks are uncommon on the Island due to the abundance of uninterrupted open space and the lack of disturbed areas. In general, movement takes place in large drainages, along ridgelines, and along dirt roads. Humanencroachment is one leading cause of restricted wildlife movement. Movement restriction can result in isolation of some animal populations resulting in a reduction of genetic diversity. The designation of open space within the Expansion Area 2 helps preserve the majority of movementareas from the northern portion of the island to the south. Further, implementation of 2030 GP/LCP policies and implementation actions would ensure that wildlife movement would not be impactedby individual projects. Therefore the General Plan/LCP FEIR concluded impacts to wildlife corridorswould be less than significant.

Environmental Analysis 4-12
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Implementation of the proposed 2030 GP/LCP would be subject to all applicable federal, State, and local policies and regulations related to the protection of biological resources. The Los Angeles County Oak Tree Ordinance recognizes oak trees on unincorporated areas as significant historical,aesthetic, and ecological resources. Oak trees are located throughout the 2030 GP/LCP planning area. Requirements under the Oak Tree Ordinance prohibits the cutting, destruction, removal, relocation, infliction of damage, or encroachment into the protected zone of any tree of the oak tree genus, which is eight or more inches in diameter without first obtaining a permit. If significant oak trees are to be removed or cut, a “permit to alter” or a “permit to remove” shall be obtained if impacts to oak trees are expected outside the City limits. Further, the 2030 GP/LCP contains policies and implementation actions to provide protection to trees and sensitive habitat while developing the 2030 GP/LCP. Therefore, the General Plan/LCP FEIR concluded that future development within the plan area would not conflict with any local policies or ordinances protecting biological resources, and no impact would occur.

The City of Avalon is not located in a habitat preservation or conservation plan area and therefore would not conflict with this threshold, Therefore, the General Plan/LCP FEW concluded no impact would occur with respect to Habitat Preservation Plans or Natural Community Conservation Plans.

Analysis of Modified Project
The Housing Element Update proposes housing policies that would encourage housing production within the planning area, However, potential development of vacant and underutilized sites toaccommodate the City’s RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts to biological resources, which would reduce potential impacts to less than significant. Future housing development, consistent with the Avalon General Plan, would be reviewed for consistency with policies and programs aimed to reduce impacts to biological resources and implement mitigation measures, as appropriate. The Housing Element policies and programs would not have an impact on existing General Plan policies protecting biologicalresources.

The revisions to the Housing Element would not result in new biological resource impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with General Plan Policies, there would be no new significant or significantly different impacts to biological resources as a result of the proposed Project.

Environmental Analysis 4-13

4.5 CULTURAL RESOURCES
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significant lmpactiNo
Requirhig Requiring Significant Impact! Changes or
Major EIR Major EJR effects than Less Than Information
Thresholds- Revisions Revisions Previous EIR Significant Requirhig Impact Preparation
With of an MND
Application orEIR
of
Mitigation
from FEIR
Would the project:
a. Cause a substantial adverse change in
the significance of a historical resource X
pursuant to § 15064,5? b. Cause a substantial adverse change in the significance of an archaeological X
resource pursuant to § 15064.5?
c. Disturb any human remains, including
those interred outside of formal Xcemeteries?
General Plan/lIP FEIR ConclusionsIt is known that prehistoric populations were present in Avalon, and that the planning area containsidentified archaeological sites. The Preliminary Cultural Resource Management Plan identified one recorded pre-historic archaeological site and four recorded historic archaeological sites. The prehistoric archaeological site contains the remains of a pre-historic village and is considered to be one of the most important archaeological sites in southern California. Though the site is now almostcompletely covered with pavement, concrete, and buildings, the 2030 GP/LCP may facilitatedevelopment in this sensitive area. The four historic archaeological sites include remains of homesites with historic debris, building foundations, stone walls, and walkways. Development may occur on or near these historic archaeological sites under the 2030 GP/LCP Therefore, impacts tothese resources would be potentially significant.

Further, it is estimated that approximately 2,000 archaeological sites are present on CatalinaIsland and less than 1,000 having been discovered. Over 900/o of the Avalon planning area hasnever undergone an archeological survey. Therefore, the potential to encounter additional, undiscovered resources within the City (and/or potential annexation areas) is considered moderate to high. The 2030 GP/LCP could potentially facilitate development in areas of cultural resource sensitivity. The 2030 GP/LCP includes policies and implementation actions intended to address potential impacts to archaeological resources. Additionally, the General Plan/LCP FEIR concluded that compliance with Mitigation Measure CR-i, which would add implementation actions to the 2030 GP/LCP that would require excavation for any project located within a potential sensitive area to be monitored by a qualified archaeologist and/or Native American Representative and, for four identified historically archeologically sensitive areas, require prior consultation with the planning department and a qualified archaeologist regarding the implementation of acceptable mitigation Environmental Analysis 4-14
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
strategies, would ensure impacts to identified and undiscovered prehistoric archaeological resources would be less than significant.

Three properties in Avalon are listed on the National Register of Historic Places: the Tuna Club of Avalon, the Peter Gano House (Holly Hill House), and the Wrigley Summer Cottage (Inn at Mt.Ada). In addition, there are a number of structures of local historical and architectural interest within Avalon. These historic resources are not anticipated to be affected by future developmentactivity. Historic resources and structures of local interest are well known and documented resources that are valued by the community and integral to the City’s tourist economy. Therefore, future development is unlikely to affect these resources. Though build-out of the 2030 GP/LCP is not anticipated to affect historic resources, the proposed General Plan would involve intensification of uses in the City Center where many structures of historic value are located. The proposed 2030GP/LCP policies do not avoid impacts altogether, In addition, the 2030 GP/LCP encourages rehabilitation of identified structures of historical value. Rehabilitation activities have the potential to directly impact their significance by destroying the historic fabric of the structure. Impacts to historic resources may be potentially significant. However, the 2030 GP/LCP includes policies and implementation actions intended to address potential impacts to historic resources. Additionally, the General Plan/LCP FEIR concluded that compliance with Mitigation Measure CR-2, which would add implementation actions to the 2030 GP/LCP requiring that structures that may be of historical value incorporate the Secretary of the Interior’s Standards for Rehabilitation and Guidelines forRehabilitating Historic Buildings and/or consult with local museums or cultural societies and incorporate mitigation as necessary, would ensure impacts to historical resources would be less than significant.

Analysis of Mothfied Project
The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’s RHNA would be consistent with the adopted land use policy and would notresult in any changes to existing land uses or allow for greater development than what wasanalyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs toreduce potential impacts to historic and archeological resources and human remains. If human remains are encountered during excavation, all work must halt and the remains would requireproper treatment in accordance with applicable laws, including State of California Health and Safety Code Sections 7050.5-7055 and Public Resources Code Section 5097.98 and Section 5097.99.

Further, General Plan/LCP FEIR Mitigation Measures CR-i and CR-2 add implementation actions to the 2030 GP/LCP Conservation Element to reduce impacts to archeological and historic resources.

Future housing development, consistent with the Avalon General Plan, would be reviewed for consistency with policies and programs aimed to reduce potential impacts to cultural resources and implement mitigation measures, as appropriate. The Housing Element policies and programswould not have an impact on existing General Plan policies protecting cultural resources.

The revisions to the Housing Element would not result in new cultural resource impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with the recommended General Plan/LCP FEIR mitigation measures and General Plan Policies, there would be no new significant or significantly different impacts to cultural resources as a result of the proposed Project.

Environmental Analysis 4-15
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEtR
General Plan/LCP FEW Mitigation Measures:

CR-i Add the following Implementation Actions to Section IV.H of the 2030 GP/LCP Conservation Element:
• Require excavation for any project located within a potential sensitive area to be monitored by a qualified archaeologist and/or Native American Representative. • Require any proposed excavation or modification to areas on the four historic archeologically sensitive areas defined in Figure 4 of the Preliminary Cultural ResourceManagement Plan to require prior consultation with the planning department and a qualified archaeologist regarding the implementation of acceptable mitigation strategies.

CR-2 Add the following Implementation Actions to Section IV.H of the 2030 GP/LCP Conservation Element:
• Require projects involving modification or rehabilitation of structures that may be of historical value to incorporate the Secretary of the Interior’s Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings.
• Require projects involving demolition of an existing structure that maybe of historical value to consult with local museums or cultural societies and incorporate mitigation, such as photo documentation, collection of oral histories, and physical or digital model, asnecessary.

Environmental Analysis 4-16

4.6 ENERGY
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Would the project:
a. Result in potentially significant
environmental impact due to wasteful,
inefficient, or unnecessary consumption X
of energy resources, during projectconstruction or operation? b. Conflict with or obstruct a state or local
plan for renewable energy or energy X
efficiency?
General Plan/LCP FUR Conclusions
This topic is addressed within Section 4.6, Greenhouse Gas Emissions/Climate Change, Section4.9, Land Use and Planning, and Section 5.2, Irreversible Environmental Effects in the General Plan/LCP FEIR.
• Future land uses consistent with the proposes General Plan would increase energy consumption in the planning area, requiring that additional energy resources be delivered to residents and businesses by Southern California Edison (SCE). Future projects proposed consistent with the General Plan would be required to complete an environmental review process which would assess whether SCE can accommodate the energy needs of thatproject. In addition, future development would be required to comply with the current energy performance standards found in Title 24 as well as General Plan energy conservation policies and actions. This is considered a less than significant impact.

Analysis of Modified Project
The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites toaccommodate the City’s RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts to energy resources. Future housing development, consistent with the Avalon General Plan, would be reviewed for consistency with policies and programs aimed to reduce potential impacts to energy resources. The Housing Element policies and programs wouldnot have an impact on existing General Plan policies addressing energy resources.

Environmental Analysis 4-17
S
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant ImpactlNo
Requiring Requiring Significant Impact! Changes or
Major Elk Major Elk effects than Less Than Information
Revisions Revisions Previous EIR Significant Requiring Thresholds: Impact Preparation With of an MND
Application or Elk
of
Mitigation
from FEIR
City of Avalon I 2O212O29 Housing Element Update
Addendum to the General Plan/LCP FEIR
The revisions to the Housing Element would not result in new energy resource impacts beyondthose identified in the General Plan/LCP FEIR. Following compliance with the recommended General Plan/LCP PER mitigation measures and General Plan Policies, there would be no new significant or significantly different impacts to energy resources as a result of the proposed Project.

Environmental Analysis 4-18
City of Avalon I 2021-2029 housing Element Update

4.7 GEOLOGY AND SOJLS
Addendum to the General Plan/LCP FEIR
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant lmpactlNo
Requiring Requiring Significant lmpactl Changes orMajor EIR Major FIR effects than Less Than Information Revisions Revisions Previous EIR Significant ReqWring Thresholds:

Impact Preparation
With ofan MND
Application or FIR
of
Mitigationfrom FEIR
Would the project:
a. Directly or indirectly cause potential
substantial adverse effects, including
the risk of loss, injury, or death
involving:

Rupture of a known earthquake
fault, as delineated on the most
recent Alquist-Priolo EarthquakeFault Zoning Map issued by theState Geologist for the area orbased on other substantial evidence of a known fault? Referto Division of Mines and Geology Special Publication 42.
• Strong seismic ground shaking?• Seismic-related ground failure, including liquefaction?
• Landslides?
b. Result in substantial soil erosion or the
loss of topsoil?
c. Be located on a geologic unit or soil that
is unstable, or that would becomeunstable as a result of the project andpotentially result in on or off-sitelandslide, lateral spreading, subsidence.liquefaction or collapse? d. Be located on expansive soil, as defined
in Table 18-1-B of the Uniform BuildingCode (1994), creating substantial direct or indirect risks to life or property?
e. Have soils incapable of adequately
supporting the use of septic tanks oralternative waste water disposal Xsystems where sewers are not availablefor the disposal of waste water? f. Directly or indirectly destroy a unique
paleontological resource or site or Xunique geologic feature? Environmental Analysis 4-19
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
General Plan/LCP FEIR Conclusions
Avalon is located in a seismically active region of California. No active faults have been mappedwithin Avalon; however, the City lies in a seismically active region that is prone to periodic earthquakes. According to the Southern California Earthquake Data Center Map, there are 5 activeor potentially active faults within 25 miles of Avalon. The range of maximum probable moment magnitudes for earthquakes emanating from these faults ranges from 6.0 to 7.4. These regional faults as well as the San Andreas Fault (85 miles away) are all capable of affecting Avalon. Faults generally produce damage in two ways; surface rupture and seismically induced ground shaking.

Surface rupture is generally limited to areas very near the fault, while ground shaking can affect a wide area. The 2030 GP/LCP includes policies intended to minimize the risks associated with seismic related hazards. Proper engineering, including compliance with the California Building Code (CBC), the Avalon Municipal Code and the policies in the 2030 GP/LCP, would minimize the risk to life and property, resulting in a less than significant impact to new development fromgroundshaking. Therefore, the General Plan/LCP FEIR concluded that with implementation of the CBC requirements and polices contained in the Safety Element, impacts would be less than significant in this regard.

Due to the low water table, the potential for liquefaction in Avalon and in the Expansion Areas islow. Also, soils in and around Avalon have a low potential for expansiveness. Nonetheless, to more accurately determine geologic and soil stability, site-specific geologic studies would be needed.

The 2030 GP/LCP includes policies intended to reduce exposure to potentially hazardous geologic conditions. The CBC also includes specific requirements to address hazards. Therefore, the General Plan/LCP FEIR concluded that with implementation of the CBC requirements and polices containedin the Safety Element, impacts related to geologic or soil instability would be less than significant.

Avalon is characterized by hillside terrain surrounding a flat City Center. Slope instability hazards are present throughout the hillside portions of the plan area. Slope instability may result in landslides, slumps, mudslides, or debris flows that can cause substantial damage and disruption to buildings and infrastructure. Any development within identified landslide hazard zones would have the potential for landslide-related damage. There are two known landslide areas in Avalon. A fall area occurs along the road to Pebbly Beach, where rocks fall onto the road. Pebbly Beach is part of Expansion Area No. 1. The other area is a slide area in the vicinity of Vieudeiou Avenue, Hill Street, Olive Street, and Maiden Lane. This area is already developed with high density residential uses. This land use designation would not change under the 2030 GP/LCP. Nevertheless, development in this area, in Expansion Area No. 1, or development facilitated by the GP/LCP in hillside areas would be subject to potential landslide hazards.

Impacts from these types of soil hazards are generally reduced to less than significant levels by the standard development review process. Standard building and grading procedures would mitigate most soil hazards. Geotechnical engineering of any landslide areas would be necessary to ensure that slopes would not become destabilized during grading activities. Onsite soilinvestigations identify local hazard conditions, which are then mitigated through implementation of appropriate engineering designs and construction techniques and through proper site improvements. The 2030 GP/LCP contains policies that require evidence and mitigation of development projects within areas of geologic instability and encourages infill in the City Center in Environmental Analysis 4-20
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
lieu of expanding development into Avalon’s hillsides. Further, in compliance with the General Plan/LCP FEIR, Mitigation Measure GEO-3 adds implementation measures to the 2030 GP/LCPSafety Element to minimize human exposure to landslide areas and require study and mitigationof development projects within landslide hazard zones. Therefore, the General Plan/LCP FEIR concluded that with implementation of CBC requirements, pohcies contained in the Land Use andSafety Elements, and Measure GEO-3, impacts related to landslide hazards would be less thansignificant.

Soils in the Avalon hillsides and in areas near the coast have a moderate erosion potential.

Development could lead to loss of soil or topsoil. Also, structures and facilities constructed on erosive soils, as well as occupants of the structures, would have the potential to be exposed to hazards related to erosion. The CBC includes requirements to address soil related hazards. Typical measures to treat hazardous soil conditions involve removal, proper fill selection, and compaction.In addition, individual projects on one or more acre of land are subject to the Construction General Permit adopted by the State Water Resources Control Board (SWRCB). As such, the project wouldbe required to develop and implement an erosion control plan. Further, the project would be required to meet the requirements for long-term control of runoff in the City’s NPDES permit for Stormwater Discharges From Municipal Separate Storm Sewer Systems (MS4). As individualdevelopment projects are considered for construction, separate environmental review may be required, which could result in the implementation of project-specific mitigation measures.

Additionally, the 2030 GP/LCP includes policies intended to reduce impacts related to erosion.

Therefore, the General Plan/LCP FEIR concluded that compliance with the CBC and 2030 GP/LCP policies would reduce soil related hazard impacts and potential soil loss to a less than significantlevel.

Analysis of Modified Project
The Project does not propose site-specific development, but is rather an update to a policy document to comply with new laws and reinforce existing policy direction. The Housing ElementUpdate proposes housing policies that would encourage housing production within the planningarea. However, potential development of vacant and underutilized sites to accommodate the City’sRHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts associated with geology and soils. Future housing development, consistent with the Avalon General Plan, would be reviewed for consistency with policies and programs aimed to reduce potentialimpacts associated with geology and soils, including preparation of site-specific geotechnical analysis and required compliance with the Avalon Municipal Code. The Housing Element policies and programs would not have an impact on existing General Plan policies regarding geology andsoils.

While the General Plan/LCP FEIR did not specifically address septic tank soil, future developmentwould comply with existing regulations, including Chapter 6.7 of the Avalon Municipal Code.

Compliance with existing regulations and the policies and programs contained in the 2030 GP/LCP would ensure that any impacts to soils incapable of adequately supporting the use of septic tanksor alternative waste water disposal systems would be less than significant.

Environmental Analysis 4-21
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Paleontological resources, while not specifically addressed in the General Plan/LCP FEIR, would similarly comply with existing regulations, as well as applicable General Plan/LCP FEtR Mitigation Measures, Compliance with existing regulations, policies and programs contained in the 2030 GP/LCP, and applicable GP/LCP FEIR Mitigation Measures would reduce impacts to unique paleontological resources, sites, or unique geologic features to a level that is less than significant.

The revisions to the Housing Element would not result in new impacts to geology and soils beyond those identified in the General Plan/LCP FEtR. Following compliance with the recommended General Plan/LCP FEW mitigation measures and General Plan Policies, there would be no new significant or significantly different impacts to geology and soils as a result of the proposed Project.

Environmental Analysis 4-22
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

4.8 GREENHOUSE GAS EMISSIONS
Would the project:
a. Generate greenhouse gas emissions,
either directly or indirectly, that may
have a significant impact on the
environment?
b. Conflict with an applicable plan, policy
or regulation adopted forthe purpose ofreducing the emissions of greenhousegases? General PIan/LCP FEIR Conclusions
Development facilitated by the 2030 GP/LCP would generate greenhouse gas (GHG) emissions through vehicle use. The GP/LCP could facilitate the development of expansion areas as well as intensified development throughout the current City limits. This development would generally increase vehicle use and extend vehicle trips into currently undeveloped areas. Overall, vehiclemiles traveled may increase with buildout of the 2030 GP/LCP, which would incrementally increase GHG emissions. However, this increase would be limited by the policies in the Land Use andCirculation Element that encourage compact development and alternative transportation.

Development facilitated by the 2030 GP/LCP would also generate GHG emissions through energy consumption, However, the Conservation Element contains specific policies to reduce energyconsumption by promoting energy efficiency and renewable energy use as well as reducing solid waste, Therefore, implementation of 2030 GP/LCP policies is expected to reduce GHG emissions as compared to the “business as usual” approach. Further, SCAQMD’s recommended GHG thresholds apply to individual development projects only; they do not apply to plans such as the 2030 GP/LCP. Individual projects will be required to undergo independent project-level CEQAreview and to include mitigation measures to address potentially significant impacts. Therefore, the General Plan/LCP FEIR concluded that impacts would be less than significant in this regard.

SB 375 required the California Air Resources Board to set regional targets for GHG emissions from use of light duty vehicles associated with land use decisions. Also, Metropolitan Planning Organizations (MPO5) must address their regional GHG reductions targets in a Sustainable Communities Strategy (SCS) as part of the MPO’s Regional Transportation Plan (RTP). The Southern California Association of Governments (SCAG), which is the MPO for Avalon, adopted an RTP/SCS in 2012 for the planning period of 2012 through 2035. Implementation of the proposed2030 GP/LCP would be consistent the goals and strategies contained in the SCAG 2012-2035RTP/SCS to reduce per capita GHG emissions and the 2030 GP/LCP would maintain or reduce per Environmental Analysis 4-23
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significant ImpactiNo
Requiring Requiring Significant bnpacti Changes orMajor EIR Major EIR effects than Less Than Information Revisions Revisions Previous EIR Significant Requhing Thresholds:

Impact Preparation
With of an MND
Application orEIR
of
Mitigation
from FEIR
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
capita emissions in Avalon below per capita emissions for the Southern California region. Further,the 2030 GP/LCP policies aim to further reduce per capita emissions by promoting infill and mixeduse development, energy conservation, and solid waste reduction. Therefore, the General Plan/LCP FEIR concluded that impacts would be less than significant in this regard.

The California Climate Change Center and the California Climate Adaptation Strategy estimate thatsea level rise could reach 55 inches by the year 2100. As a result of sea level rise, coastal areasare at risk to inundation, flooding, and erosion. Avalon is located entirely within a coastal zone andthe 2030 GP/LCP includes policies that encourage development near the shoreline, subjecting new development to inundation and flooding due to sea level rise. This is a potentially significant impact.

The Conservation Element includes GP/LCP policies and implementation actions to reduce risks associated with rising sea level, However, more specific analysis is needed to examine which areasof Avalon are most vulnerable to flooding and erosion due to sea level rise in order to avoid risks.

Therefore, the General Plan/LCP FEIR concluded that impacts due to sea level rise would be less than significant with implementation of Mitigation Measure GHG-3. However, despite planningefforts to minimize the effects of sea level rise on the community, portions of Avalon may continue to be subject to increased risk of coastal flooding due to sea level rise.

Analysis of Modified Project
The Housing Element Update proposes housing policies that would encourage housing production withjn the planning area. However, potential development of vacant and underutilized sites toaccommodate the City’s RHNA would be consistent with the adopted land use plan and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. Future housing development, consistent with the Avalon General Plan, would be reviewed for consistency with policies and programs aimed to reduce GHGemission impacts as a result of new development. Additionally, Mitigation Measure GHG-3addresses impacts due to sea level rise as a result of climate change.

The revisions to the Housing Element would not result in new GHG emission impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with the recommended GeneralPlan/LCP FEIR mitigation measures and General Plan Policies, there would be no new significant or significantly different impacts to GHG emissions as a result of the proposed Project.General Plan/LCP FEIR Mitigation Measures:

GHG-3 Add the following Implementation Action to Section IV.C in the Conservation Element:
• Collaborate with climate science experts to identify areas that may be exposed to risks due to sea level rise, such as flooding or erosion.

Environmental Analysis 4-24
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

4.9 HAZARDS AND HAZARDOUS MATERIALS
Would the project:a. Create a significant hazard to the public or the environment through the routine
transport, use, or disposal of hazardous
materials?
b. Create a significant hazard to the public
or the environment through reasonablyforeseeable upset and accidentconditions involving the release ofhazardous materials into theenvironment? c. Emit hazardous emissions or handle
hazardous or acutely hazardousmaterials, substances, or waste within Xone-quarter mile of an existing orproposed school? d. Be located on a site which is included on
a list of hazardous materials sitescompiled pursuant to Government Code Section 65962.5 and, as a result, would it
create a significant hazard to the publicor the environment? e. For a project located within an airport
land use plan or, where such a plan hasnot been adopted, within two miles of apublic airport or public use airport, X would the project result in a safety
hazard or excessive noise for peopleresiding or working in the project area? f. Impair implementation of or physically
interfere with an adopted emergencyresponse plan or emergency evacuationplan? g. Expose people or structures, either
directly or indirectly, to a significant riskof loss, injury or death involving wildland fires?
General PIan/LCP FEIR Conclusions
There are no large-scale generators or users of hazardous materials in the City. The use andtransport of hazardous materials within the City is limited to household hazardous wastes, small commercial/industrial uses, and liquid propane. The proposed 2030 GP/LCP would facilitate theannexation of Expansion Area No. 1, which would increase light industrial uses within the City boundaries. New industrial uses would be similar in nature to existing industrial uses, such as Environmental Analysis 4-25
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significant lmpactlNo
Requiring Requiring Significant lmpactl Changes orMajor EIR Major EIR effects than Less Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds: Impact Preparation With of an MND
Application erEIR
of
Mitigation
from FEIR
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
automotive repair shops, and the use, storage, and transport of hazardous materials would besimilarly minimal. New businesses in Expansion Area No. 1 would also be subject to federal, State, and local regulations regarding the use, storage, and transport of hazardous materials. Regular transport of hazardous materials is limited to the propane that is barged over from the mainlandto the SCE facility in Pebbly Beach. SCE manages the transport of the propane. Safety measuresfollow SCE protocol and no incidents related to propane transport have occurred. Any future largescale activities with the potential to generate or use hazardous materials in the City would be required to obtain a permit and comply with applicable federal, State, and local regulations. Smallscale hazardous material users would be subject to existing federal, State, and local regulationsregarding the use and disposal of hazardous waste. As individual development projects are considered for construction, separate environmental review may be required, which could result in the implementation of project-specific mitigation measures. In addition, the 2030 GP/LCP contains policies that aim to minimize adverse impacts to health and quality of life associated with exposure to hazardous materia1s. Therefore, the General Plan/LCP FEIR concluded that compliance with federal, State, and local regulations, in combination with the proposed 2030 GP/LCP policies, would reduce impacts related to the use, storage, and transport of hazardous materials to a less than significant level. Additionally, because the use, storage, and transport of hazardous materialswithin the City is limited and there are no hazardous material transportation corridors within theCity, impacts related to upset or accident conditions would also be less than significant.

Avalon Schools is a kindergarten through 12th grade school, located at 200 Falls Canyon Road.

The new expansion areas proposed by the 2030 GP/LCP would not be located within 1/4 mile of Avalon Schools and/or would not include uses that would use hazardous materials or generate hazardous waste. However, the relocation of industrial uses to the Falls Canyon/Avalon Canyonarea could place hazardous materials within 1/4 mile of Avalon Schools. New industrial sites wouldbe up-gradient of the school, which could result in potential impacts if a hazardous material release occurs. Small-scale hazardous material users would be subject to existing federal, State, and local regulations regarding the use and disposal of hazardous waste. As individual development projects are considered for construction, separate environmental review may be required, which could result in the implementation of project-specific mitigation measures. Additionally, the 2030 GP/LCP contains policies aimed at reducing impacts to schools associated with exposure to hazardous materials. Therefore, the General Plan/LCP FEIR concluded that compliance with federal, State, and local regulations, in combination with the proposed 2030 GP/LCP policies, would reduce impacts related to the use, storage, and transport of hazardous materials within a 1/4 mile of a school to a less than significant level
The 2030 GP/LCP would also intensify the use of several residential and commercial properties within the City; however, residential and commercial uses do not typically handle hazardous materials that would pose a threat to a school. There may be a slight increase in use of household hazardous wastes or small commercial hazardous waste, such as petroleum-based fuels, chlorinated solvents, acrylic coatings, corrosive or caustic additives, but these materials are usually contained on-site and are subject to federal, state, and local regulations regarding use, storage,and disposal. Small-scale hazardous materials would not pose a threat to the nearby school.Therefore, the General Plan/LCP FEIR concluded that impacts resulting from the use or emission of hazardous materials within proximity to a school would be less than significant.

Environmental Analysis 4-26
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
The 2030 GP/LCP would facilitate new or re-development within the City, as well as the annexation of Expansion Areas No. 1, 2, and 3. There are no sites located in any of the Expansion Areas that are listed as hazardous materials sites. None of the sites found through a search of the EnviroStorand GeoTracker databases, as well as the Cortese List, would be expected to result in hazardous conditions for any new or re-development within the City or proposed Expansion Areas due to the remedial status of the listed sites. There is one site in the City Center, Pebbly Beach Building Supplies, where assessment is still underway. However, the potential media affected is not listedand any new or re-development on this site would be required to comply with Regional WaterQuality Control Board regulations regarding potential contaminants. Small-scale hazardous material users would be subject to existing federal, State, and local regulations regarding the use and disposal of hazardous waste. Further, the 2030 GP/LCP contains policies aimed at reducingimpacts associated with existing hazardous materials sites within Avalon. Therefore, the GeneralPlan/LCP FEtR concluded compliance with federal, State, and local regulations, in combination with the proposed 2030 GP/LCP policies, would reduce impacts related to hazardous materials sites to a less than significant level.

The intensification of uses facilitated by the 2030 GP/LCP may result in the demolition or renovation of the existing structures in the plan area, which, due to their age, could contain asbestos and/or lead. The removal of any asbestos and lead-containing materials would be required to comply with all pertinent existing rules and regulations, including SCAQMD Rule 1403, Asbestos Emissions from Demolition/Renovation Activities, which would minimize health hazards associated with these activities. In addition, any future development facilitated by the 2030 GP/LCP would have to complywith CaIOSHA regulations regarding lead-based materials. California Code of Regulations, §1532.1, requires testing, monitoring, containment, and disposal of lead-based materials such that exposurelevels do not exceed CaIOSHA standards. Therefore, the General Plan FEIR concluded that impacts would be less than significant in this regard.

New development and intensified development facilitated by the 2030 GP/LCP would be included in the City’s existing emergency response operations. Local disaster response is coordinated under the Avalon Disaster Council. In addition, the City maintains mutual aid agreements with regional agencies to ensure the City’s ability to receive assistance when demands for emergency services are greater than the City’s available resources. The City also utilizes the Emergency Management Information System (EMIS), a computer database system that provides detailed, real time information about emergencies from the County Emergency Operations Center. New and intensified development would be required to comply with all of the existing emergency response operations. New and intensified development would also be required to comply with all Fire Codestandards regarding emergency access. In addition, the 2030 GP/LCP contains policies that aim to maintain emergency services and disaster response preparedness. Therefore, the GeneralPlan/LCP FEIR concluded that compliance with local and regional emergency plans, in combination with the proposed 2030 GP/LCP policies, would reduce impacts related to emergency response andevacuation to a less than significant level.

The topic of wildland fires is addressed in the General Plan/LCP FEIR Section 4.12, Pub/ic Services.

Environmental Analysis 4-27
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Analysis of Modified Project
The Project does not propose site-specific development, but is rather an update to a policy document to comply with new laws and reinforce existing policy direction. The Housing ElementUpdate proposes housing policies that would encourage housing production within the planningarea. However, potential development of vacant and underutilized sites to accommodate the City’sRHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts due to hazards or hazardous materials. Additionally, Mitigation Measure GHG-3 addresses impactssuch as flooding, erosion, and inundation due to sea level rise as a result of climate change.

The revisions to the Housing Element would not result in new hazards and hazardous materials impacts beyond those identified in the General Plan/LCP FER. Following compliance with therecommended General Plan/LCP FEIR mitigation measures and General Plan Policies, there wouldbe no new significant or significantly different impacts related to hazards and hazardous materials as a result of the proposed Project.

Environmental Analysis 4-28
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

4.10 HYDROLOGY AND WATER QUALITY
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significant ImpactlNo
Requiring Requiring Significant Impact! Changes or
Major EIR Major EIR effects than Less Than Information
Thresholdr Revisions Revisions Previous EIR Significant Requiring Impact Preparation
With of an MND
Application Of EIR
of
Mitigation
from FEIR
Would the project:
a. Violate any water quality standards or
waste discharge requirements or
otherwise substantially degrade surfaceor groundwater quality? b. Substantially decrease groundwater
supplies or interfere substantially withgroundwater recharge such that the Xproject may impede sustainablegroundwater management of the basin? c. Substantially alter the existing drainage
pattern of the site or area, including
through the alteration of the course of astream or river or through the addition of impervious surfaces, in a manner which
would:
• result in substantial erosion or
siltation on- or off-site;
• substantially increase the rate or
amount of surface runoff in a X
manner which would result in
flooding on- or offsite;
• create or contribute runoff water
which would exceed the capacityof existing or planned storrnwater drainage systems or providesubstantial additional sources of polluted runoff; or
• impede or redirect flood flows?
d. In flood hazard, tsunami! or seiche
zones, risk release of pollutants due to X
project inundation?
e. Conflict with or obstruct implementation
of a water quality control plan orsustainable groundwater management plan?
Environmental Analysis 4-29
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
General Plan/LCP FEIR Conclusions
Soil disturbance would temporarily occur due to construction of future developments facilitated bythe proposed GP/LCP, due to earth-moving activities, such as excavation and trenching for foundations and utilities, soil compaction and moving, cut and fill activities, and grading. Disturbedsoils are susceptible to high rates of erosion from wind and rain, resulting in sediment transportvia stormwater runoff from the project area. Runoff from construction sites would be typical of urban areas, and may include sediments and contaminants such as oils, fuels, paints, and solvents.

Additionally, other pollutants, such as nutrients, trace metals, and hydrocarbons, can attach to sediment and be transported to downstream drainages and ultimately into collecting waterways,contributing to degradation of water quality. Construction materials, debris handling, and the useof construction equipment, could also result in stormwater contamination and impact water quality.

Accordingly, areas that disturb one or more acres of land surface are subject to the ConstructionGeneral Permit, 99-08-DWQ adopted by the State Water Resources Control Board (SWRCB).

Preparation of a Stormwater Pollution Prevention Plan (SWPPP) is required for compliance with the NPDES General Construction Stormwater Activity Permit. Compliance with the permit would involve filing a Notice of Intent with the SWRCB and preparing and submitting a SWPPP prior to construction activities, The SWPPP must describe the site, the facility, erosion and sedimentcontrols, runoff water quality monitoring, means of waste disposal, implementation of approved local plans, control of construction sediment and erosion control measures, maintenance responsibilities, and non-stormwater management controls. Inspection of construction sites beforeand after storms is required to identify stormwater discharge from the construction activity and toidentify and implement controls where necessary. The Construction General Permit requirements would need to be satisfied prior to beginning construction on any project located on a site greaterthan one acre. Certain other projects require the preparation of a Water Quality Management Plan (WQMP). Both the SWPPP and provisions for obtaining a grading permit require approval of an erosion control plan. The erosion control plan could include measures such as limitations on gradingduring the dry season and construction discharges, as well as requirements for soil stabilizationand use of sediment traps. Additionally, grading permits would include recommendations and mitigation measures addressing erosion control which would be incorporated into grading plans.

The proposed GP/LCP also includes policies designed to minimize stormwater and erosional impacts during construction. Compliance with these regulations would reduce the risk of water degradation within the City from soil erosion related and construction activities. Since violations of water quality standards would be minimized, impacts to water quality from construction activities within theGP/LCP area would be less than significant.Operation of future developments under the proposed GP/LCP would result in the addition ofcontaminants into both the stormwater runoff entering the City’s drainage system and the wastewater stream entering the local wastewater collection and treatment systems. Futuredevelopments would increase the amount of impervious surfaces within the City, which could potentially increase stormwater runoff. In addition, the operation of new land uses could result in the release of contaminants that would further degrade the quality of the stormwater runoff and wastewater, The proposed GP/LCP would promote infill development where appropriate throughoutthe plan area, consistent with existing land use patterns, intensities and building types. The potential for infill development to contribute to polluted runoff would be minimal. Areas ofundeveloped land would provide areas for high density and low density development as well as Environmental Analysis 4-30
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General PIan/LCP FEIR
resort/recreational development in Expansion Area 2. These developments would result in additional urban runoff typically containing contaminants such as oil, grease, metals, and landscaping chemicals (pesticides, herbicides, fertilizers, etc.). These contaminants could be transported by stormwater runoff into the City’s drainage system and ultimately degrade surfacewater and groundwater quality. In addition to stormwater runoff, polluted wastewater would bedischarged by new development. The increase in industrial and residential land uses would result in increases in wastewater contaminated with household and industrial chemicals that would discharge to the local wastewater systems. Stormwater discharges originating from these and other land uses would be treated at the Avalon Wastewater Treatment Facility and discharged into the Pacific Ocean.

NPDES permits are required for operators of Municipal Separate Storm Sewer Systems M54s, construction projects, and industrial facilities. To prevent harmful pollutants from being washed ordumped into an M54, operators must obtain a NPDES permit and develop a stormwater management program. These permits contain limits on the amount of pollutants that could be contained in each facility’s discharge. Specifically, all development within the City would be subject to the provisions of the City’s NPDES MS4 Permit. Developments within the City would also besubject to the provisions in Chapter 1.11 (Erosion Control and Water Quality RequirementsSystems) of the Avalon Municipal Code. tndividual future developments will be subject to further review and, as appropriate, project-specific mitigation. In addition, the 2030 GP/LCP contains goals and policies aimed at implementing water conservation strategies, minimizing potable water use in new development projects, minimize water consumption, encourage high efficiency irrigation technology, limit development, reduce stormwater pollution, require BMPs during grading and construction, reduce waterborne pollutants, eliminate sewage from entering groundwater, and remediate sewage contamination. Therefore, the General Plan/LCP FEIR concluded that compliancewith NPDES permits requirements, the City’s Municipal Code, and GP/LCP policies would reduce the risk of water degradation within the City from the operation of new developments to the maximum extent practicable. Impacts would be less than significant in this regard.

Construction activities would primarily occur as part of infill with the potential for development within Rural Residential development areas and development within Expansion Area 2. Becausethe plan area is near the coast, the groundwater table underlying the GP/LCP area is shallow andfor the most part at sea level. Pile driving, dewatering, and other construction activities that would encounter groundwater could potentially occur. While the insertion of support and foundation structures in the groundwater may reduce the storage capacity of groundwater, the displacedvolume would not be substantial relative to the volume of the basin as a whole. Likewise, whiledewatering would remove groundwater, the volume of water removed would not likely besubstantial relative to groundwater pumping for water supply. Also, water used during construction for cleaning, dust control, and other uses would be minimal and per Chapter 6.13 of the City of Avalon Municipal Code, freshwater will not be used for soil compaction or vehicle cleaning. Thus,the General Plan/LCP FE concluded that construction activities would not substantially deplete groundwater supplies or interfere substantially with groundwater recharge and impacts would be less than significant.

The primary source of fresh water in Avalon is groundwater, which is pumped into the Middle Ranch/Thompson Reservoir with a desalination plant, located at Pebbly Beach. New development Environmental Analysis 4-31
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
occurring from implementation of the proposed GP/LCP would increase the demand forgroundwater as supplied by SCE. As discussed in Section 4.14, Utilities and Service Systems, ofthe General Plan/LCP FEIR, the City’s projected groundwater supplies will meet projected demand.

Additionally, the 2030 GP/LCP includes policies to ensure water conservation and reduce potential impacts to groundwater supply. Therefore, the General Plan/LCP FEIR concluded that increased demand for groundwater supply within the City under the proposed GP/LCP would not substantiallydeplete groundwater supplies and impacts would be less than significant.

The increase in development and addition of impervious surfaces as a result of developmentfacilitated by the proposed GP/LCP would not interfere with groundwater recharge. New development on vacant lands would incrementally reduce the amount of pervious surfaces within the plan area. However, the City is not identified as a key area of groundwater recharge. The 2030GP/LCP would focus on infill development, consistent with existing land use patterns, intensitiesand building types. Additionally, the General Plan/LCP contains policies to ensure waterconservation and reduce potential impacts to groundwater supply. Therefore, the General Plan/LCP FEIR concluded that new development would not substantially affect groundwater recharge andimpacts would be less than significant.

Construction activities under the proposed GP/LCP would involve stockpiling, grading, excavation,dredging, paving, and other earth-disturbing activities that could alter existing drainage patterns.

These types of activities would constitute a temporary alteration of drainage patterns. The 2030 GP/LCP contains policies that would regulate construction activities to eliminate potentiallydestructive practices that remove topsoil and provide for continued enforcement of the requirements of the federal NPDES and other federal and state requirements pertaining to soil management and surface runoff. The General Plan/LCP FEIR concluded that compliance withSWRCB’s NPDES General Construction Activity Stormwater Permit, NPDES MS4 regulations, and the City’s Municipal Code would reduce the risk of short-term erosion resulting from drainage alterations during construction to a less than significant level.Development under the proposed GP/LCP would result in alterations to drainage, such as changesin ground surface permeability via paving, changes in topography via grading and excavation. TheGeneral Plan/LCP FEIR concludes that compliance with NPDES regulations, the City’s Municipal Code, and implementation of 2030 GP/LCP policies would reduce the risk of erosion resulting fromdrainage alterations during the operation of new developments to a less than significant level.

As described above, development under the proposed GP/LCP includes both infill development and new development. Construction in undeveloped areas including Rural Residential, Low Densityresidential, and expansion areas would add impervious surfaces. Increased impervious surfaces would increase the overall volume of stormwater runoff by reducing infiltration. This increased runoff could potentially exceed the capacity of existing and planned infrastructure and cause downstream flooding impacts. However, compliance with MS4 requirements and 2030 GP/LCP policies would reduce the volume sediment-laden runoff discharging from sites within the plan area and reduce the volume of runoff generated, and potential for flooding, throughout the plan area.

Additionally, the 2030 GP/LCP policies and Chapters 1.11 and 1.12 of the Avalon Municipal Codewould require storm drain maintenance; mitigation of flood hazards by including onsite drainage systems that are connected to the City’s storm drain system, grading of sites within the project Environmental Analysis 4-32
City of Avalon p 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
area such that runoff does not impact adjacent properties, or elevating buildings above flood levels;and incorporation of storrnwater detention basins. Additionally, the City and the Santa Catalina Island Company undertook significant storm infrastructure improvements in 2004 and presumably the flood zone has been reduced as a result of those efforts. Further, if development proposeschanges to drainages, this would occur in compliance with CDFG Streambed Alteration regulations in order to maintain drainage patterns. Therefore, the General Plan/LCP concluded thatimplementation of the proposed GP/LCP policies and compliance with NPDES regulations, the City’s Municipal Code, and CDFG regulations would reduce the risk of flooding resulting from drainage alterations to a less than significant impact.

Due to the impending increasing population density within the City and the construction of multi story and multi-family dwellings, new hotel units, and new subdivisions, the City’s sewage system is approaching the limit of capacity to accommodate the increased volume of sewage generated by such developments. According to Section 7.101 of the City’s Municipal Code, the sewer redevelopment program shall be carried out in accordance with a master plan of construction tobe adopted by the City to best serve the public interests and safety. Implementation of the upgrades proposed by the City would help alleviate any existing deficiencies but would not provideadequate infrastructure to support development upon implementation of the proposed GP/LCP.

While development in many urbanized portions of the GP/LCP area may not substantially exceed existing storm drain facilities, proposed development in currently vacant and underdevelopedareas, such as Expansion Area 2, would necessitate of the construction of new or the expansion ofexisting storm drain infrastructure. The 2030 GP/LCP includes policies that would ensure that new development can be adequately supported by utilities such as storm drainage infrastructure and re-use systems limiting overall drainage requirements. Additionally, Section 7.106 of the City’s Municipal Code requires expansion of existing or construction of new facilities prior to issuance of a building permit or occupation. To further ensure new facilities are provided, the newly adopted Sewer System Management Plan identified in the 2030 GP/LCP will ensure that adequate facilities are provided to serve permitted land use development. Upgrades, expansion, and construction of necessary utilities to accommodate new development would be subject to project-specific environmental review. Therefore, the General Plan/LCP FEIR concludes that impacts to infrastructure would be less than significant.

As described above, GP/LCP area is located along the coast and is underlain by a shallow groundwater table. Construction of development under the proposed GP/LCP could result indegradation of groundwater resources due to earth-disturbing activities. Compliance with Chapter

1.11 of the Municipal Code would ensure that these earth-disturbing activities would not result in adverse groundwater conditions. In addition, hazardous materials used during construction could contaminate surface water and percolate into the groundwater underlying the project area if the materials are not properly contained. The 2030 GP/LCP contains policies that require protection of groundwater recharge areas as well as surface water and groundwater impacted by construction activities. Therefore, the General Plan/LCP FEIR concluded that impacts associated with thedegradation of groundwater quality during construction activities would be less than significant.

In coastal groundwater basins, groundwater quality can be degraded through the intrusion ofseawater primarily by pumping for domestic and irrigation water supply. As groundwater is extracted, the ability is created for seawater to migrate into the area from which the groundwater Environmental Analysis 4-33
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan! LCP FEIR
was extracted. Degradation of groundwater quality would reduce the groundwater basin yield,diminishing production from existing activities and limiting future groundwater development. Asdescribed above, development under the 2030 GP/LCP would be adequately served by the existingwater supply and as such would not substantially increase groundwater pumping, the project wouldnot adversely impact groundwater quality due to saltwater intrusion. Additionally, the new infrastructure would be connected to the saltwater systems thereby further reducing the demand of fresh water. Therefore, the General Plan/LCP FEIR concluded that with implementation of the proposed GP/LCP policies and compliance with the Municipal Code, development under theproposed GP/LCP would not otherwise degrade water quality and impacts would be less than significant.

The 100-year flood zone is primarily contained in and along the edges of Avalon Canyon and Avalon Bay. As described above, the City and the Santa Catalina Island Company undertook significant storm infrastructure improvements in 2004 and presumably the flood zone has been reduced as a result of those efforts. However, as of the writing of the General Plan/LCP PER, the FEMA FIRMshave not been updated to reflect these improvements. Most of the 100-year floodplain occupiesland around the bottom of Avalon Canyon along the intermittent stream. Delineated flood hazard areas are localized areas of potential inundation that exist immediately adjacent to water courses.

Because the land designated for residential development adjacent to this 100-year floodplain is already developed, or approved for development, the General Plan/LCP FEIR concludes thatimpacts to new residential development within the 100-year flood plain would be less than significant.Additionally, the 2030 GP/LCP contains goals and policies aimed at protecting human life and public and private property from the risks of flooding. Furthermore, Chapter 9.101 of the City’s Municipal Code establishes methods and provisions that would minimize flood damage to residentialdevelopment. Therefore, the General Plan/LCP FEIR concludes that impacts of flood hazards to housing developed under the proposed GP/LCP would be less than significant.

A water displacement analysis would be required to investigate the effect of new structural development or fill on flooding depth, pursuant to FEMA regulation 44 CFR 60.3 (c)(10).

Preparation of water displacement analyses where appropriate and compliance with FEMAregulations would ensure that GP/LCP development would not substantially impede or redirect flows. Therefore, the General Plan/LCP concludes that impacts would be less than significant inthis regard.The 2030 GP/LCP includes policies that addresses the potential of flooding risks by sea level rise.Therefore, the General Plan/LCP FEIR concludes that with implementation of the 2030 GP/LCP policies and inclusion of mitigation requiring collaboration with climate science exports to identify areas that may be exposed to risks due to sea level rise, such as flooding or erosion, impacts to housing, structures, and people due to sea level rise would be less than significant.

Development under the proposed GP/LCP would increase the exposure of people to the lowprobability but high-risk events such as seiche, tsunami, and mudflows by increasing developmentin certain areas of the City, including Avalon Bay. As described above, all new development in the City occurring in areas that are subject to flood hazards would be required to comply with the flood Environmental Analysis 4-34
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
damage prevention provisions of the City’s Municipal Code. Additionally, the 2030 GP/LCP containsgoals and policies aimed at minimizing adverse effects of coastal hazards related to tsunamis, rogue waves, storm surges, and seiche within the plan area. Therefore, the General Plan/LCP FEIR concluded that impacts would be less than significant in this regard.

Analysis of Modified ProjectThe Project does not propose site-specific development, but is rather an update to a policy document to comply with new laws and reinforce existing policy direction. The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’s RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. Future housing development, consistent with the Avalon General Plan, would bereviewed for consistency with policies and programs aimed to reduce potential impacts associated with hydrology and drainage, including preparation of site-specific analysis and requiredcompliance with the Avalon Municipal Code. The Avalon General Plan includes policies andprograms to reduce potential impacts to hydrology and water quality. Additionally, MitigationMeasure GHG-3 addresses impacts such as flooding, erosion, and inundation due to sea level rise as a result of climate change.

The revisions to the Housing Element would not result in new hydrology and water quality impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with the recommended General Plan/LCP FEIR mitigation measures and General Plan Policies, there would be no newsignificant or significantly different impacts related to hydrology and water as a result of the proposed Project.

Environmental Analysis 4-35

4.11 LAND USE AND PLANNING
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant ImpactlNo
Requiring Requiring Significant Impactl Changes orMajor EIR Major EIR effects than l.ess Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds: Impact Preparation With of an MND
Application or EIR
of
Mitigation
from FEIR
I Would the project:• a. Physically divide an established x• community? b. Cause a significant environmental
impact due to a conflictwith any land use
• plan, policy, or regulation adopted for X
the purpose of avoiding or mitigating an
environmental effect?
General PIan/LCP FEIR Conclusions
The 2030 GP/LCP is a citywide plan intended to provide for the orderly development of the community through the year 2030. Therefore, the General Plan/LCP FEIR concluded that the 2030 GP/LCP would not physically divide the community.

The 2030 GP/LCP identifies three potential annexation areas adjacent to the current City corporate boundaries. The purpose of incorporating these areas would be to encourage greater tourist activity in the City and to incorporate open space into City limits. Of the three potential expansion areas, two areas are owned by the Santa Catalina Island Company and one is owned by the Catalina Island Conservancy. The Local Agency Formation Commission (LAFC0) would need to approve anyannexation proposal and would typically notify affected landowners and agencies prior toconsideration of the annexation, Given that no boundary adjustment is being sought in conjunction with the 2030 GP/LCP, future boundary adjustments would only be made at such time as they aredeemed consistent with applicable LAFCo policies, and that individual boundary adjustment proposals will need to be addressed by the City and the Los Angeles LAFCo on a case-by-case basis, no inconsistencies with LAFCo policies would occur.

SCAG’s Regional Comprehensive Plan (RCP) serves as a framework for decision-making with respect to regional growth and changes that can be anticipated through 2035 and beyond. TheRCP provides a strategic plan for defining and solving interrelated housing, traffic, water, air quality, and other regional challenges. The 2030 GP/LCP contains goals and policies that supportefforts to achieve RCP goals. Therefore, the General Plan/LCP FEIR concluded that with implementation of 2030 GP/LCP policies, the GP/LCP could be found to be consistent with RCPpolicies.

The SCAG 2012-2035 RTP/SCS links the goal of sustaining mobility with the goals of fostering economic development, enhancing the environment, reducing energy consumption, promoting Environmental Analysis 4-36
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
transportation-friendly development patterns, and encouraging fair and equitable access to residents affected by socio-economic, geographic, and commercial limitations, The RTP/SCS goalsare supported by the policies contained in the 2030 GP/LCP. Therefore, the General Plan/LCP FEWconcluded that the 2030 GP/LCP could be found to be consistent with the SCAG 2012 RTP.

SCAG has prepared the Growth Vision Report to provide a framework for local and regional decision making that improves the quality of life for all SCAG residents. The General Plan/LCP FEIR concluded that with implementation of 2030 GP/LCP policies, future development under the 2030 GP/LCP could be found to be consistent with SCAG’s Growth Vision Report.

The Los Angeles County Department of Regional Planning has prepared the Santa Catalina Island Local Coastal Plan (LCP) to promote public access to and conservation of coastal resources on Santa Catalina Island. The General Plan/LCP FEIR concluded that development under the 2030GP/LCP could be found to be consistent with the LCP.

Analysis of Modified Project
The Project does not propose site-specific development, but is rather an update to a policy document to comply with new laws and reinforce existing policy direction. Potential developmentof vacant and underutilized sites to accommodate the City’s RHNA would be consistent with the adopted land use plan and would not result in any changes to existing land uses or allow for greaterdevelopment than what was analyzed in the General Plan/LCP FEIR. Future housing development,consistent with the Avalon General Plan, would be reviewed for consistency with land use policies and programs. The Avalon General Plan includes policies and programs to reduce potential impacts resulting from new development and intensification of land uses.

The revisions to the Housing Element would not result in new land use and planning impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with the General PlanPolicies, there would be no new significant or significantly different impacts to land use and planning as a result of the proposed Project.

Environmental Analysis 4-37

4.12 MINERAL RESOURCES
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Would the project;
a. Result in the loss of availability of a
known mineral resource that would be of
value to the region and the residents ofthe state?
b. Result in the loss of availability of a
locally-important mineral resource
recovery site delineated on a local X
general plan, specific plan or other landuse plan?
General Plan/LCP FEIR Conclusions
Some areas within the City contain mineral resources and are appropriate for mineral extraction.

In the 2030 General Plan, it is the intent of the City to conserve areas needed for the managedproduction of these resources. Therefore, there would be no loss of availability of known mineralresources or of locally important mineral resource recovery sites. In addition, mineral extraction operations would be required to implement appropriate mitigation measures to avoid creatingsignificant and adverse environmental impacts. As a result, no impacts relating to mineral resourceextraction are anticipated.

Analysis of Modified Project
The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites toaccommodate the City’s RHNA would be consistent with the adopted land use policy and would notresult in any changes to existing land uses or allow for greater development than what wasanalyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs toreduce potential impacts to mineral resources as a result of new development and intensification of land uses.

The revisions to the Housing Element would not result in new mineral resources impacts beyond those identified in the General Plan/LCP FSR, Following compliance with General Plan Policiesand/or mitigation measures, there would be no new significant or significantly different impacts to mineral resources as a result of the proposed Project.

Environmental Analysis 4-38
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant ImpactiNo
Requiring Requiring Significant ImpactI Changes or
Major EIR Major EIR effects than Less Than Information
Revisions Revisions Previous EIR Significant Requiring Thresholds: Impact Preparation With of an MND
Application or EIR
of
Mitigation
from FEIR

4.13 NOISE
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Would the project result in:a. Generation of a substantial temporary or permanent increase in ambient noiselevels in the vicinity of the project in x excess of standards established in the
local general plan or noise ordinance, or
applicable standards of other agencies?
b. Generation of excessive groundborne
vibration or groundborne noise levels?
c. For a project located within the vicinity
of a private airstrip or an airport land useplan or, where such a plan has not beenadopted, within two miles of a publicairport or public use airport, would theproject expose people residing or working in the project area to excessive
noise levels?
General Plan/LCP FEIR Conclusions
Noise from individual construction projects that could be facilitated under the 2030 GP/LCP would create temporary noise level increases on and adjacent to individual construction sites. Since thereare no specific plans or time scales for individual development projects, it is not possible todetermine exact noise levels, locations, or time period for construction. However, construction noise would be highest and of the longest duration adjacent to sites where more future development/redevelopment is anticipated to occur. Noise levels associated with constructionactivity would exceed ambient noise levels and may cause temporary disturbance at neighboring properties. However, the City’s Municipal Code prohibits construction activities between the hours of 7:00 p.m. and 8:00 am., and no construction is permitted on Sundays, with the exception ofemergency construction work. Further, the 2030 GP/LCP contains policies that aim to reduce impacts associated with construction activity. Therefore, the General Plan/LCP FEIR concluded that enforcement of the existing Municipal Code policy and implementation of the 2030 GP/LCP policieswould improve protection from construction noise and reduce temporary construction impacts toa less than significant level. In addition, site-specific review of individual development projectswould be required, which would include a review of potential noise impacts on a case-by-case basis.Development facilitated by the 2030 GP/LCP may incrementally increase noise along arearoadways over the life of the GP/LCP. However, new traffic generated by development under the Environmental Analysis 4-39
Substantial Substantial Infonnation No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant lmpactiNo
Requiring Requiring Significant lmpactl Changes or
Major EIR Major EIR effects than Less Than Information
Revisions Revisions Previous EIR Significant Requiring Thresholds: Impact Preparation With of an MND
Application or EIR
of
Mitigation
from FEIR
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
2030 GP/LCP would not be expected to cause an audible increase in community noise, The 2030 GP/LCP contains policies that would ensure that noise impacts are considered as individual development projects and transportation improvements incorporate appropriate noise attenuation techniques. Also, as technology improves, it is expected that the use of alternative fuel vehicles,such as electric vehicles, will begin to replace the noisier gas-powered vehicles. In addition, as noted in numerous Circulation Element policies, the City will continue to emphasize vehicle tripreduction techniques to address traffic issues, with the added benefit that the use of such techniques would also reduce vehicular noise. Therefore, the General Plan/LCP FEIR concludes that with implementation of GP/LCP policies, increases in roadway noise would be reduced to a less than significant level.

The 2030 GP/LCP would facilitate the development of new residential and other noise-sensitive uses that could be exposed to long-term noise exceeding the normally acceptable range outlinedin the GP/LCP Noise Element. New noise sensitive uses would include residential development within the City Center, along Avalon Canyon Road, and within Expansion Areas 1 and 2. Potentialsources of noise exposure include: traffic on City roadways, intensification of commercial activity in the City Center, and industrial activity on sites that are adjacent to or near noise-sensitive uses.For most sites, the primary generator of noise that could affect sensitive receptors would beroadway traffic. New residences could also be exposed to noise generated by commercial orindustrial activity that exceeds the normally acceptable range. The 2030 GP/LCP includes a number of policies that aim to reduce noise impacts. Implementation of 2030 GP/LCP policies would ensure that projects proposed in noise environments that potentially exceed acceptable standards would be evaluated and that appropriate sound attenuation techniques would be implemented on a caseby-case basis. Depending on the specific development project proposed and the location and source of noise, sound attenuation techniques may include site design to shield noise-sensitive uses from noise, special building standards to reduce interior noise, or the use of barriers to reduce exterior noise. Therefore, the General PIan/LCP FEIR concluded that impacts related to the placement of new uses in noise environments exceeding the normally acceptable range would beless than significant.

Catalina Airport is located approximately six miles from Avalon city limits. Annexation of Expansion Area No. 2 would extend the City’s boundaries, and the Catalina Airport would be approximately4.75 miles from the new boundary. As such, Avalon would not be within two miles of an airport or private airstrip, and there would be no impacts regarding airport noise. However, the use ofprivate, recreational airplanes and helicopters around the City is common. Noise generated from these recreational aircrafts could result in nuisance noise to future development of sensitive uses.

The 2030 GP/LCP contains policies that address noise from aircrafts. Therefore, the General Plan/LCP FEIR concluded that implementation of the 2030 GP/LCP policies would ensure that new development facilitated by the 2030 GP/LCP would not be exposed to excessive noise generated by recreational flight operations. In addition, noise generated by recreational aircrafts would be temporary in nature as the aircrafts travel along their route. Impacts would be less than significant in this regard.

Environmental Analysis 4-40
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Analysis of Modified ProjectThe Project does not propose site-specific development, but is rather an update to a policy document to comply with new laws and reinforce existing policy direction. The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’sRHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. Future housing development, consistent with the Avalon General Plan, would bereviewed for consistency with policies and programs aimed to reduce potential impacts associated with noise, including preparation of site-specific analysis and required compliance with the AvalonMunicipal Code. The Avalon General Plan includes policies and programs to reduce potential impacts to ambient noise levels as a result of groundborne vibration or exposure to excessive noiselevels.

The revisions to the Housing Element would not result in noise impacts beyond those identified in the General Plan/LCP FEW, Following compliance with the recommended General Plan/LCP FEIR mitigation measures and General Plan Policies, there would be no new significant or significantly different impacts related to noise as a result of the proposed Project.

Environmental Analysis 4-411
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

4.14 POPULATION AND HOUSING
Would the project:a. Induce substantial unplanned
population growth in an area, either
directly (for example, by proposing newhomes and businesses) or indirectly (for example, through extension of roads orother infrastructure)? b. Displace substantial numbers of existing
people or housing, necessitating the x construction of replacement housing elsewhere?
General PIan/LCP FEIR Conclusions
An intent of the 2030 GP/LCP is to focus future development in Avalon in close proximity to urban and employment centers. Such “infill” development is anticipated to occur in areas with existinghousing in the City Center, in vacant or underutilized parcels on nearby hillsides, or in low-densityResort Recreational areas up Avalon Canyon. Where housing currently exists, near the City Center, infill development could displace existing housing. However, displacement of such housing wouldbe offset by the overall increase in housing units anticipated to occur through the year 2030(estimated increase of approximately 631 new residential units). One of the goals of the 2030 GP/LCP is to establish diverse housing options that are affordable for residents and located in close proximity to jobs and services. In addition, the 2030 GP/LCP includes policies intended to increasehousing options. Therefore, the General Plan/LCP FEIR concluded that with implementation of the2030 GP/LCP, impacts related to the displacement of people or housing would be less than significant.

SCAG’s Regional Comprehensive Plan (RCP) serves as a framework for addressing problems and creating a path to correct issues on a regional level through 2035. Population projections are madethrough SCAG’s Regional Transportation Plan (RTP) and are the basis for growth for the RCP. SCAG projects a population of 5,100 for the City of Avalon by the year 2035. Development facilitated by the 2030 GP/LCP would add an estimated 1,041 new permanent residents, bringing the citywide resident population from 3,780 to 4,821 by the year 2030. This growth projection for the year2030 would not exceed SCAG’s forecast population of 5,100 for the year 2035. In addition, the current Avalon Municipal Code restricts the density of residential units on steep hillsides, whichwould limit potential growth in the City’s resident population. Further, the 2030 GP/LCP includespolicies and implementation actions to direct future development in such a way as to minimize the Environmental Analysis 4-42
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant ImpactiNo
Requiring Requiring Significant Impactl Changes orMajor EIR Major EIR effects than Less Than Information Thresholdr Revisions Revisions Previous EIR Significant Requiring Impact Preparation
With of an MND
Application or EIR
of
Mitigation
from FEIR
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
impacts of growth by emphasizing the intensification and reuse of already developed areas.

Therefore, the General Plan/LCP FEIR concluded that impacts would be less than significant in this regard.

Analysis of Modified ProjectThe Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites toaccommodate the City’s RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR, Future housing development, consistent with the AvalonGeneral Plan, would be reviewed for consistency with policies and programs aimed to reduce potential impacts associated with substantial unplanned population growth and displacement.

The revisions to the Housing Element would not result in housing and population impacts beyondthose identified in the General Plan/LCP FEIR. Following compliance with the recommended General Plan/LCP FEIR mitigation measures and General Plan Policies, there would be no new significant or significantly different impacts related to population and housing as a result of the proposed Project. ronmentalAnalysis443

4.15 PUBLIC SERVICES
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
a. Would the project result in substantial
adverse physical impacts associated
with the provision of new or physically
altered governmental facilities, need fornew or physically altered governmental facilities, the construction of which
could cause significant environmentalimpacts, in order to maintain acceptableservice ratios, response times or other Xperformance objectives for any of thepublic services:
• Fire protection?
• Police protection?
• Schools?• Parks?• Other public facilities?
General Plan/LCP FEIR Conclusions
The 2030 GP/LCP would facilitate the development of Expansion Areas No. 1, 2, and 3, as well as intensified development throughout the City, especially in the City Center and the Avalon Canyon areas. Intensified development would be located within the existing Avalon Fire Department servicearea and the existing response times would apply. As such, the intensification of developmentwithin the City would not require new or expanded fire or emergency service facilities because they would fall within the existing service area and response times. However, the expansion areas would increase the service area, which may also increase response times. Avalon Fire Department response times to any new development within expansion areas may be greater than for the areas within the current City limits. However, all three expansion areas would still be expected to fallwithin a 5-minute response area. While fire and emergency medical service capacity is primarilybased on service area, an increase in population would incrementally increase the number ofservice calls and would eventually necessitate the need for additional staff and facilities. However, new development would be required to comply with any additional project-specific requirements set forth by the Avalon Fire Department, including providing adequate water pressure and water for fire flows. In addition to property taxes, which supports the Avalon Fire Department, the City can also require mitigation fees as a condition of approval for individual projects to ensure thatnew developments contribute a fair share to fire and emergency services, facilities, andinfrastructure. In addition, new development sited in high fire hazard areas would be required toadhere to standard requirements set forth by the California Building Code (CBC) with City of Avalon Environmental Analysis 4-44
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant lmpactlNo
Requiring Requiring Significant Impact? Changes orMajor EIR Major EIR effects than Less Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds: Impact Preparatien With of an MND
Application or EIR
of
Mitigation
from FEIR
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
amendments. The entire City is designated as a very high fire hazard zone. Therefore, any development in the City would be sited in very high fire hazard zones and would be required to adhere to applicable policies. Any development in hillside areas is of particular concern becausethese areas are especially fire prone. Adherence to standard requirements would minimize the risks of fire hazards. Further, the 2030 GP/LCP contains policies aimed at addressing potential wild fire hazards associated with potential new development. Therefore, the General Plan/LCP FEIRconcluded that development facilitated by the 2030 GP/LCP would not result in the need for newor expanded fire protection facilities and impacts relating to fire protection would be less than significant.

Police protection services are not “facility-driven;” that is, police protection services are not asreliant on facilities in order to effectively patrol a beat. An expansion of, or intensification of development within, a beat does not necessarily result in the need for additional facilities if policeofficers and patrol vehicles are equipped with adequate telecommunications equipment in order tocommunicate with police headquarters. However, if the geographical area of a beat is expanded, population increases, or intensification/redevelopment of an existing beat results in the need fornew police officers, new or expanded facilities could be needed. The Avalon Patrol Station provides police protection services within the City and would continue to provide police protection services through 2030. Development facilitated by the 2030 GP/LCP would not result in the need to construct new police facilities and there would only be a slight increase, if any, in the response times for the potential expansion areas. While the response times would remain relatively low, the projected increase in population through the year 2030 could increase the demand for additional sworn officers. In the event that additional officers are needed to provide adequate police services, the City’s General Fund would continue to provide the finances necessary to employ additional officers. Therefore, the General Plan/LCP FEIR concluded that development facilitated by the 2030GP/LCP would not result in the need for new or expanded police protection facilities and impacts would be less than significant.

Development facilitated by the 2030 GP/LCP would likely increase enrollment at Avalon Schools.

The General Plan/LCP concluded that new students potentially generated by future development facilitated by the 2030 GP/LCP would not exceed the current capacity. State-mandated school impact fees would, however, be required for any new development projects. Pursuant to Section 65995(h) of the California Government Code (Senate Bill 50, chaptered August 27, 1998), the payment of statutory fees “. is deemed to be full and complete mitigation of the impacts of anylegislative or adjudicative act, or both, involving, but not limited to, the planning, use, or development of real property, or any change in governmental organization or reorganization.” Because existing school facilities are sufficient to serve the existing population and the anticipated growth, expansion or construction of new facilities are not planned at this time. The remainingavailable capacity of Avalon School and future payments of school impact fees would ensure that impacts to schools would be less than significant. Site- and project-specific environmental review would be required for schools if, or when, new sites are proposed for development in the future.

Therefore, the General Plan/LCP FEIR concluded that the collection of State-mandated school impact fees would reduce school capacity impacts to a less than significant level.

There are various parks and recreational activities within the City of Avalon and the surrounding area of Catalina Island, which are some of the main attractions for tourists and residents, In Environmental Analysis 4-45
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
addition, the City is surrounded by various water recreational activities, such as boating,snorkeling, scuba diving, and kayaking. The City and the island are also well-known for hiking trails. However, picnic and ball fields within the City are frequently filled with various functions andthere is an existing need for additional facilities An increased population of permanent residents under the 2030 GP/LCP would put an additional strain on park facility resources. However, the 2030 GP/LCP includes two expansion areas that would increase the dedicated open space within the City. Expansion Area 2 would be mostly designated Open Space with some Resort/Recreational uses near the Hamilton Cove area. Expansion Area 3 would all be designated Open Space south of the Avalon Canyon area. Furthermore, the 2030 GP/LCP contains policies and implementation actions aimed at expanding and maintaining existing parks and recreation facilities. Therefore, the General Plan/LCP FE concluded that with the addition of new designated Open Space uses andadherence to the 2030 GP/LCP policies and implementation actions, impacts to park services and recreation facilities would be reduced to a less than significant level.

Development facilitated by the 2030 GP/LCP would likely generate increased demand for harbor services, such as additional moorings, docks, piers, and restrooms. The addition of moorings,docks, piers, or restrooms could result in potential adverse construction impacts, as well as potential adverse operational impacts. Operational impacts to aesthetics, water quality, utilities,and/or noise would primarily result from an increase in the number of boats and related facilities in the harbor. However, there are currently no planned or pending projects to expand harbor facilities and the construction of new harbor facilities would be subject to individual project reviewand approval by the City of Avalon, wherein any project specific impacts would be addressed. The provision of harbor services is an ancillary service within the City and is based on availability rather than need. Therefore, the General Plan/LCP FEIR concluded that impacts would be less thansignificant in this regard. However, Mitigation Measure PS-5 is recommended to further reduce impacts associated with an increased demand for harbor services. Mitigation Measure PS-S recommends the addition of a policy and implementation action to the 2030 GP/LCP to improve access to harbor services to meet recreational, commercial, and industrial boating demands.

Analysis of Modified ProjectThe Housing Element Update proposes housing policies that would encourage housing production within the planning area. Potential development of vacant and underutilized sites to accommodatethe City’s RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses, The Avalon General Plan includes policies and programs to reducepotential impacts to public services as a result of new development and intensification of land uses.

The revisions to the Housing Element would not result in public services impacts beyond those identified in the General Plan/LCP FEW, Following compliance with the recommended General Plan/LCP FEIR mitigation measures and General Plan policies, there would be no new significant or significantly different impacts related to public services as a result of the proposed Project.

General Plan/LCP FEIR Mitigation Measures:

PS-S Additional GP/LCP Harbor Services Policy. The addition of the following policy and implementation action to the 2030 GP/LCP is recommended, Environmental Analysis 4-46
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
III.B Open Space for Public Recreation: Improve access to harbor services to meet the recreational, commercial, and industrial boating demands in a way that minimizes orimproves environmental outcomes.

Environmental Analysis 4-47

4.16 RECREATION
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General PIan/LCP FEIR
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant lmpactlNo
Requiring Requiring Significant Impact! Changes orMajor EIR Major EIR effects than I.ess Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds:

Impact Preparation
With of an MND
Application or EIR
of
Mitigation
from FEIR
a. Would the project increase the use of
existing neighborhood and regional
parks or other recreational facilities such x that substantial physical deterioration of the facihty would occur or be
accelerated?
Ii Does the project include recreational
facilities or require the construction orexpansion of recreational facilities which X might have an adverse physical effect on
the environment?
General Plan/LCP FEIR Conclusions
The topic of recreation is addressed in General Plan FEIR Section 4.12, Public Services. For purposes of this Addendum, the topic of recreation is discussed in Section 4.15, Public Services, consistent with the organization of the General Plan FEIR.

Analysis of Modified Project
The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’s RHNA would be consistent with the adopted land use policy and would notresult in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts to parks and recreation facilities as a result of new development andintensification of land uses. Additionally, Mitigation Measure PS-S recommends the addition of a policy and implementation action to the 2030 GP/LCP to improve access to harbor services to meetrecreational, commercial, and industrial boating demands.

The revisions to the Housing Element would not result in parks and recreation facilities impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with General Plan policies, there would be no new significant or significantly different impacts related to recreation as a result of the proposed Project.

Environmental Analysis 4-48

4.17 TRANSPORTATION
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Substantial Substantial Information No Less Than No knpact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significant ImpacUNo
Requiring Requiring Significant Impact! Changes orMajor EIR Major EIR effects than Less Than Information Revisions Revisions Previous EIR Significant Requiring Thresholds:

Impact Preparation
With of an MNO
Application or EIR
of
Mitigation
from FEIR
Would the project:a. Conflict with a program, plan. ordinance or policy addressing the circulation
system, including transit, roadway,
bicycle and pedestrian facilities?
b. Would the project conflict or be
inconsistcnt with CEQA Guidelines X
section 15064.3. subdivision (b)?
c. Substantially increase hazards due to a
geometric design feature (e.g., sharp
curves or dangerous intersections) or Xincompatible uses (e.g., farm equipment)?
d. Result in inadequate emergency
access?
General Plan/LCP PEER Conclusions
Avalon does not contain any roadways that are part of the 2010 Los Angeles Congestion Management Plan Transit Network. Therefore, the General Plan/LCP concluded that the 2030 GP/LCP would not conflict with the applicable congestion management plan and no impact wouldoccur in this regard. Though there is an airfield on the northern part of Catalina Island, there are no airfields or airports within the City of Avalon. Therefore, the General Plan/LCP concluded thatno impact to air traffic patterns would occur as a result of buildout under the 2030 GP/LCP.

The 2030 GP/LCP would facilitate development of expansion areas and intensify development in Avalon Canyon. This may incrementally increase traffic on Avalon’s roadway system and affect both intersections and roadway capacities. Avalon does not currently use level of service or other standards for pedestrian and vehicular circulation; rather, the City strictly regulates vehicle use.

According to the 2006 Facilities and Services Holding Capacity Report for the City ofAvalon, overall, there is 46°/o of total vehicle capacity remaining. It is expected that residential and commercial vehicle use would remain constant or drop over time, but the use of autoettes (smaller vehicleswith higher fuel efficiency) would increase as more housing units are developed. Assuming a 1 to 1 ratio of housing units to new autoettes, autoette usage would increase by 22°/o, which is within the remaining vehicle capacity of 46w/a. In addition, the 2030 GP/LCP identifies physical and operational improvements that would address existing circulation issues and accommodate growth.

Further, the 2030 GP/LCP includes policies and actions specifically intended to accommodate traffic generated by new growth in the City. Therefore, the General Plan/LCP FEIR concluded that Environmental Analysis 4-49
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
adherence to GP/LCP policies and implementation of planned improvements would ensure theroadway network in Avalon does not exceed capacity and impacts would be less than significant.

The 2030 GP/LCP encourages higher-density, mixed-use mull in the City Center. By emphasizing intensification and reuse in the City Center, the GP/LCP could accommodate new mixed use and residential development along existing roadways. The placement of residences along existing travel corridors is expected to generally increase bicycling and pedestrian activity in these areas, with the potential for increased hazards for pedestrians and bicyclists. However, the 2030 GP/LCP includes policies and actions specifically intended to increase traffic calming and enhance the walkability throughout the City. By designating appropriate street segments as one-way andclosing appropriate segments to through traffic, friction between pedestrians, bicyclists, and vehicles would be reduced. Implementation of proposed policies is expected to generally improve overall safety conditions for pedestrians throughout the City. Implementation of GP/LCP policies on any future development would also minimize traffic-related hazards associated with thedevelopment of those areas. Therefore, the General Plan/LCP FEIR concluded that impacts related to traffic safety as a result of development under the 2030 GP/LCP would be less than significant.

A goal of the 2030 GP/LCP is to “reduce the amount that people drive by increasing opportunities for walking, bicycling, and transit.” The 2030 GP/LCP includes policies aimed at enhancement of alternative transportation mode opportunities throughout the City. In addition, the GP/LCP emphasizes intensification and reuse of already developed areas of the City. Implementation of the policies included in the 2030 GP/LCP is expected to improve the availability of sidewalks, bike paths, and transit over time. Planned improvements in the Circulation Element would improve alternative transportation modes. By making these transportation alternatives more attractive,GP/LCP implementation is expected to foster an increase of alternative transportation use and adecrease of vehicle use. Therefore, the General Plan/LCP FEIR concluded that impacts related to alternative transportation would be considered beneficial.

As described above, areas within one-mile beyond the existing city limits would be within the Avalon Fire Department’s 5-minute response area. In addition, all three expansion areas wouldstill be expected to fall within a 5-minute response area. However, the 2030 GP/LCP would facilitatedevelopment into Expansion Areas and into hillside areas that are currently not served by roads, or are served by one roadway. Currently, the Hamilton Cove area is only accessible through one road, which is prone to rock slides. During an emergency event, a slide could prevent emergency access to this area. Improvements in this area are already partially funded and underway.

Development facilitated by the proposed 2030 GP/LCP would be required to comply with applicable Building Code and Fire Code requirements. As such, new development would also be required to comply with any additional project-specific requirements set forth by the Avalon Fire Department, including providing adequate emergency access. In addition, the 2030 GP/LCP includes policies consistent with this requirement. Therefore, the General Plan/LCP FEIR concluded that implementation of the 2030 GP/LCP policies and compliance with existing building and fire codes would address potential emergency access issues associated with potential new development and impacts would be less than significant.

Transportation from the Los Angeles area to Catalina Island is provided by private companies.

Demand for regional transportation between Avalon and the California mainland may incrementally Environmental Analysis 4-50
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
increase with implementation of the 2030 GP/LCP. However, a goal of the Circulation Element is to “ensure the continued availability of water and air transport between Avalon and the mainland.” The 2030 GP/LCP includes policies and implementation actions intended to enhance the regionaltransportation system to and from Avalon. Increased regional transportation demand may require enhanced facilities to accommodate ships, cross channel carriers, and freight service, theconstruction of which may result in secondary impacts to air quality, biological resources, greenhouse gas emissions, and public services (such as Harbor Patrol). However, any facilityenhancement or construction activity would be required to adhere to the California Coastal Act, would require coastal permits, CEQA documentation, and review and oversight by the City and theCoastal Commission. Further, facilities would be required to follow all Coast Guard rules and regulations regarding sea travel, traffic schemes, and passenger safety. Therefore, the GeneralPlan/LCP FEIR concluded that with adherence to these regulations, impacts would be less than significant.

Analysis of Modified Project
The General Plan/LCP FEIR did not address potential impacts to vehicle miles traveled (VMT) because at the time of preparation of the General Plan/LCP FEIR, VMT was not the primary metricused as the basis for determining the significance of transportation impacts under CEQA. However, the proposed Project does not include site-specific development or result in any changes to existing land uses or allow for greater development than what was considered in the General Plan/LCP FEIR. Thus, the proposed Project would result in the same VMT as would occur under the existing General Plan and would not result in new impacts or substantially more significant impacts related to VMT.As noted above, the Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’s RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts to the circulation system, including increased hazardsand emergency access, as a result of new development and intensification of land uses.

The revisions to the Housing Element would not result in transportation impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with the recommended General PlanPolicies, there would be no new significant or significantly different impacts related to transportation as a result of the proposed Project.

Environmental Analysis 4-51
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
418 TRIBAL CULTURAL RESOURCES
Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that Is;a. Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register of Xhistorical resources as defined in PublicResources Code section 5020.1(k), or b. A resource determined by the lead
agency, in its discretion and supportedby substantial evidence, to be significantpursuant to criteria set forth insubdivision (c) of Public ResourcesCode Section 5024.1. In applying the Xcriteria set forth in subdivision (c) ofPublic Resources Code Section 5024.1, the lead agency shall consider the
significance of the resource to aCalifornia Native American tribe.

General Plan/LCP FEIR Conclusions
Since certification of the General Plan/LCP FEIR, the CEQA Guidelines Appendix G Checklist has been revised to include a new category for Tribal Cultural Resources impacts. This topical area is addressed in the General Plan/LCP FEIR Section 4.4, Cultural Resources.

Analysis of Modified ProjectThe Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites toaccommodate the City’s RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programsand the General Plan/LCP FEIR includes Mitigation Measure CR-i to add implementation actions to the 2030 GP/LCP Conservation Element to reduce impacts related to tribal cultural resources. The Housing Element policies and programs would not have an impact on existing General Plan policiesprotecting tribal cultural resources.

The revisions to the Housing Element would not result in new tribal cultural resource impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with the recommended Environmental Analysis 4-52
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant lmpactiNo
Requiring Requiring Significant lmpactl Changes or
Major EIR Major EIR effects than Less Than Information
Revisions Revisions Previous EIR Significant Requiring Thresholds: Impact Preparation With of an MND
Application orEIR
of
Mitigation
from FEIR
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
General Plan/LCP FEIR mitigation measures and General Plan Policies, there would be no newsignificant or significantly different impacts to tribal cultural resources as a result of the proposedProject.

Environmental Analysis 4-53
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

4.19 UTILITIES AND SERVICE SYSTEMS
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Mditional Significant
Project Circumstance Greater Significant lmpactiNo
Requiring Requiring Significant lmpactl Changes or
Major EIR Major EIR effects than Less Than Information
Revisions Revisions Previous EIR Significant Requiring Thresholds:

Impact Preparation
With of an MND
Application or EIR
of
Mitigation
from FEIR
Would the prolect:
a. Require or result in the relocation or
construction of new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which
could cause significant environmentaleffects?
b. Have sufficient water supplies available
to serve the project and reasonablyforeseeable future development during normal, dry and multiple dry years?
c. Result in a determination by the
wastewater treatment provider whichserves or may serve the project that it x has adequate capacity to serve the project’s projected demand in addition
to the provider’s existing commitments?
d. Generate solid waste in excess of State
or local standards, or in excess of the
capacity of local infrastructure, or Xotherwise impair the attainment of solid waste reduction goals?
e. Comply with federal, state, and local
management and reduction statutes and Xregulations related to solid waste? General Plan/LCP FEIR Conclusions
Development facilitated by the 2030 GP/LCP includes development and redevelopment of lands within the current City boundaries, as well as within potential annexation areas, referred to as “Expansion Areas.” Areas where redevelopment activity could occur include areas that are alreadyserved by existing water infrastructure. Development of vacant lands would require new connections. New development would result in a permanent increase in the City’s water demand relative to existing conditions. The General Plan/LCP FEIR concluded that current surplus of freshwater would be adequate to serve the estimated increase in demand due to the 2030 GP/LCP.

In addition, the desalination plant has the capacity to increase the production of desalinated water, which would provide an additional buffer of freshwater availability for growth projected under the 2030 GP/LCP. Further, infrastructure improvements and increased connectivity to the saltwater system would further reduce demand on freshwater. Due to the limited groundwater supply in Avalon and the high cost of desalinated water, the City should continue to pursue new sources of Environmental Analysis 4-54
City of Avalon 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
freshwater and implement water conservation strategies. Accordingly, the 2030 GP/LCP contains policies that would further reduce impacts to water supply. Therefore, the General Plan/LCP FEIR concluded that water supply impacts would be less than significant.Population growth projected under the 2030 GP/LCP would increase city-wide wastewater generation. However, sufficient treatment capacity exists at the Avalon Wastewater Treatment Facility to serve the increase in population under the 2030 GP/LCP. In addition, sewer line capacity estimates indicate that there is sufficient capacity to accommodate existing and new wastewater generated by additional population under the 2030 GP/LCP. Further, the City’s Municipal Coderequires all plans for the construction of sewer infrastructure to meet all design requirements, as established by the City Engineer. Projects that could occur during the lifetime of the 2030 GP/LCPwould be examined on an individual basis to determine their effects on the wastewater infrastructure. Therefore, the General Plan/LCP FEIR concluded that with adherence to the City’sMunicipal Code and because the wastewater treatment provider has adequate capacity to meet the potential population growth, no new wastewater treatment facilities or the expansion of existing facilities would be necessary, and impacts related to the City’s sewer system capacity would be less than significant.

Increased population and development that may occur under the GP/LCP would generate additional solid waste. The General Plan/LCP concluded that the Pebbly Beach Disposal site would havesufficient capacity to serve the daily throughput of solid waste generated by the 2030 population.

In addition, the City has entered into a new contract with CR&R, Inc that would extend the capacity and life of the landfill. Under this new disposal agreement with CR&R, the life and capacity of the landfill would be extended to the year 2033 on account of a larger baler that would be installed at the landfill site. Additionally, the height of the landfill would be raised and an energy to power plant is being proposed that would further extend the life of the landfill. Further, the City hasimplemented 25 diversion programs to increase the life of the landfill. The California Integrated Waste Management Act of 1989 requires all cities in California to achieve a 50°/o solid wastediversion rate by the year 2000. As of 2006, the City of Avalon achieved a solid waste diversion rate of 7O%. In addition to the diversion programs in place, the 2030 GP/LCP includes policies andimplementation actions related to minimizing solid waste. Potential future development facilitatedby the 2030 GP/LCP would also be reviewed on a project-by-project basis; solid waste impacts would be evaluated based on existing and planned disposal facilities and capacities available.

Therefore, the General Plan/LCP concluded that through the continued efforts of the existing diversion programs and the new disposal agreement with CR&R that would extend the life andcapacity of the landfill through at least the year 2033, the GP/LCP policies and implementationactions, and project specific review, the current landfill facility would have sufficient capacity toserve the daily throughput of solid waste generated by the 2030 population; impacts related tosolid waste would be less than significant.

Environmental Analysis 4-55
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
Analysis of Modified Project
The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’s RHNA would be consistent with the adopted land use policy and would notresult in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts to utilities and service systems as a result of new development and intensification of land uses, Additionally, upgrades, expansion, and construction of necessaryutilities to accommodate new development would be subject to project-specific environmentalreview. The Housing Element policies and programs would not have an impact on existing General Plan policies addressing utilities and service systems
The revisions to the Housing Element would not result in new utilities and service systems impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with General Plan Policies, there would be no new significant or significantly different impacts related to utilities and service systems as a result of the proposed Project.

Environmental Analysis 4-56

4.20 WILDFIRE
City of Avalon 2021-2029 housing Element Update
Addendum to the General Plan/LCP FEIR
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant knpactlNo
Requiring Requiring Significant Impact! Changes or
Major EIR Major EIR effects than Less Than Information
Thresholds Revisions Revisions Previous EIR Significant Requiring Impact Preparation
With of an MND
Application or EIR
of
Mitigation
from FEIR
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:
a. Substantially impair an adopted
emergency response plan or emergency Xevacuation plan?
b. Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to, X
pollutant concentrations from a wildfireor the uncontrolled spread of a wildfire? c. Require the installation or maintenance
of associated infrastructure (such as
roads! fuel breaks, emergency water
sources, power lines or other utilities) Xthat may exacerbate fire risk or that may result in temporary or ongoing impacts
to the environment?
d. Expose people or structures to
significant risks, including downslope ordownstream flooding or landslides, as a Xresult of runoff, post-fire slope instability, or drainage changes?
General PIan/LCP FEIR Conclusions
Since certification of the General Plan/LCP FEIR, the CEQA Guidelines Appendix C Checklist has been revised to include a new category for Wildfire impacts. This topical area is addressed in the General Plan/LCP FEIR Section 4.12, Public Services.

The entire City is designated as a very high fire hazard zone. Therefore, any development in the City would be sited in very high fire hazard zones and would be required to adhere to applicable policies. Any development in hillside areas is of particular concern because these areas are especially fire prone. Adherence to standard requirements would minimize the risks of fire hazards.

Further, the 2030 GP/LCP contains policies aimed at addressing potential wild fire hazards associated with potential new development, Therefore, impacts would be less than significant.

Analysis of Modified ProjectThe Project does not propose site-specific development, but is rather an update to a policy document to comply with new laws and reinforce existing policy direction. The Housing Element Update proposes housing policies that would encourage housing production within the planning area. However, potential development of vacant and underutilized sites to accommodate the City’s Environmental Analysis 4-57
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General PIan/LCP FEW
RHNA would be consistent with the adopted land use policy and would not result in any changes to existing land uses or allow for greater development than what was analyzed in the General Plan/LCP FEIR. The Avalon General Plan includes policies and programs to reduce potential impacts due to wildfires.

The revisions to the Housing Element would not result in new wildfire impacts beyond those identified in the General Plan/LCP FEIR. Following compliance with General Plan Policies, there would be no new significant or significantly different impacts related to wildfire as a result of the proposed Project.

Environmental Analysis 4-58
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR

4.21 MANDATORY FINDINGS OF SIGNIFICANCE
Substantial Substantial Information No Less Than No Impact Change in Change in Showing Additional Significant
Project Circumstance Greater Significant lmpactlNo
Requiring Requiring Significant lmpactl Changes orMajor EIR Major EIR effects than Less Than Information hdth Revisions Revisions Previous EIR Significant Requiring Ms ‘ Impact Preparation
With of an MND
Application orEIR
of
Mitigation
from FEIR
a. Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish orwildlife species, cause
a fish or wildlife population to dropbelow self-sustaining levels, threaten to eliminate a plant or animal community,substantially reduce the number orrestrict the range of a rare or endangered plant or animal or eliminate importantexamples of the major periods ofCalifornia history or prehistory? b. Does the project have impacts that are
individually limited, but cumulativelyconsiderable? (Cumulatively considerable’ means that theincremental effects of a project are X considerable when viewed in connectionwith the effects of past projects, theeffects of other current projects, and the effects of probable future projects)?
c. Does the project have environmental
effects which will cause substantial
adverse effects on human beings, either
directly or indirectly?
General PIan/LCP FEIR Conclusions
As described above, the General Plan/LCP FEIR concluded that full implementation of the General Plan would result in less than significant impacts or less than significant impacts with theimplementation of mitigation measures for all issue areas analyzed. The General Plan/LCP FEIR’s background and policy information and environmental impact conclusions are cited throughout this Addendum.

Analysis of Modified Project
Future housing could significantly impact, directly or through habitat modifications, sensitive vegetation communities and/or sensitive plant and wildlife species; refer to Section 4.4 above.

Additionally, ground-disturbing activities associated with future development, such as grading or excavation, could unearth undocumented archeological or disturb unknown human remains; referto Section 4.5 above. Individual project proposals would be subject to review under CEQA, and site-specific biological and cultural surveys would be conducted, as needed, to evaluate potential Environmental Analysis 4-59
City of Avalon I 2021-2029 Housing Element Update
Addendum to the General Plan/LCP FEIR
impacts to such resources. Following compliance with the established regulatory framework,recommended FEW mitigation measures, and Genera! Plan Policies, no new significant impact tobiological or cultural resources or substantial increase in the severity of previously identified significant impacts would occur with implementation of the Project.

The General Plan/LCP FEIR determined that all cumulative impacts were determined to be lessthan significant.

The anticipated housing development would not result in environmental effects that would cause substantial adverse effects on human beings.

Environmental Analysis 4-60

CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 AGENDA ITEM:

ORIGINATING DEP: Administration CITY MANAGER:

PREPARED BY: Devin Hart, Management Analyst
SUBJECT: Consideration of Transportation Permit — Daniel Mello, dba Catalina Island Golf Cart Tours
RECOMMENDED ACTION: Discuss and provide direction to Staff. If consensus to approveis reached make the affirmative finding that the criteria set forth in Avalon Municipal Code Section 5-14.04 has been meet.REPORT SUMMARY: On August 16, 2022 Daniel Mello, dba Catalina Island Golf Cart Tours, submitted a Transportation Permit application to the City of Avalon to perform guided autoette tours.The proposed route includes areas from the downtown area to Three Palms, Chimes Tower Road, and Botanical Gardens.It is stated in the application that the business will operate year-round, during daylight hours or from 7:00 am. to 7 p.m. daily. The business will not have a brick-and-mortar location and beweb based. Customer’s utilizing the service will be picked-up and dropped off at prearranged locations — such as hotels, vacation rentals, etc. The operation plan includes use of two golf carts — both requiring new commercial permits. If the transportation permit is approved, then will need to seek approval from the vehicle hearing officer. Upon approval, the commercially permitted vehicle will be required to have off-street overnight parking.

Avalon Municipal Code Section (AMC) 5-14.04 requires a hearing before the City Council to determine whether a transportation permit should be approved. Per the AMC Sec. 5-14.04 (ii) Permits: Applications: Requirements.* (b) The Council may grant a permit upon the proposed terms or upon terms otherthan those proposed. The Council shall make the initial permit grant, and the VehicleClerk may thereafter renew a permit if he is able to make affirmative findings based onthe criteria set forth below. If the Vehicle Clerk is unable to make the affirmative findings, he shall so advise the permit holder and set a hearing date before the VehicleHearing Officer, whose decision on the renewal shall be appealable to the City Councilin accordance with the procedures set forth in Title 1, Chapter 4.:
(1) The applicant has presented facts demonstrating a necessity for the requested vehicle(s).
(2) The requested vehicle(s) is appropriate for the intended use and necessary, for the proper functioning of the applicants enterprise; (3) The requested vehicle(s) will not have a deleterious impact on traffic congestion, traffic safety, noise or air pollution;
(4) In view of the size and nature of the streets of the City and the character of the City itself, the requested vehicle(s) will not have a deleterious impact on the public health, safety, and welfare;
(5) There is no more suitable alternative vehicle than the vehicle(s) requested by the applicant that can satisfy its requirements.
(6) In the case of renewal only, the requested vehicle has beeti used and continues to be used in accordance with the terms and conditions of the permit.

At this time, three similar golf cart tour business are in possession of transportation permits — Avalon Local Tour, You be Driven, Catalina Guided Golf Cart Tours. To date, these three operations have had negligible impacts to traffic and/or congestion. No accidents or incidents resulting from the business have been reported to the City.If approved by the City Council, the applicant must additionally meet the following conditions before a permit may be issued:
• Receive approval from the Vehicle Hearing Officer;• Receive approval of a business license;• Provide written permission from the Catalina Island Company to operate on private roads
• Agree to limit pick up and drop off locations to hotels, rental units, or requested locations not to include the Cabrillo Mole, and
• Provide proof of insurance per the Avalon Municipal Code.

Upon renewal each year the Vehicle Clerk will evaluate if the business model has adversely added to the traffic, safety, and congestion in Avalon.

FISCAL IMPACTS: Potential for nominal additional revenue to the City through taxes.

CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: N/A
FOLLOW UP ACTION: Implement City Council direction.

ADVERTISING, NOTICE AND PUBLIC CONTACT: Pursuant to the Brown Act.

ATTACHMENTS:

1. Transportation application
City of Avalon
Application
For
Transportation Permit
Date of Application Application Fee $23t00
Name of Applicant A_. /ueILAddress /79’7/I4V4/-e/J ec!
PhonelEmail - /&l —COç+mcQQo 3e9
If Corporation:

Name of Corporation
Date of Incorporation
Place of Incorporation
Address of BusinessCorporate Officers:

Name Address
Trade Name of Operation L-/4 i4/rAf 4,4,it) 4e-F /
TcJ
Nature of Business, (Explain extent, character and manner in which proposed operation isto be conducted):
‘t F 64Ar II?YJ
Ci/%ML3 7?t- 4— 2rHAJSaIL— I
Vehicles to be Used:

Year Model Body Type License # CapacityA4E.4L& ,4111Zou4 t-2 L J7 27r/ôs6 b 2&2L*4S
Assign inent:Applicant agrees not to assign permit, (if granted), in any manner whatsoever, in whole or inpart, without prior written permission of the Avaon City Council. Any attempted assignment inviolation of this SectionS shall be deemed void with no force or effect.Initial .i.Lcs Date (Proposed Dates/Hours of 0 eration:Dates: to Hours: ?.LQLPP. ce yr /%/ (ak
Routes:

Describe routes (attach map if necessary )‘1 7. (J77” 5772e5L3 •7?4 Ptnj cklMc$ jP._&JThxaC_
Stops/Starts:Proposed routes, points of discharge and pick-tip of passengers.From: JAJI&kfli ,4,zt 4 to rHe4 g.i774JJc4c
L!L.T°
From: to
2 If my Permit Is Granted;
I agree to provide liability insurance naming the City of Avalon as co-insured in the amountsspecified in the Avalon Municipal Code and keep such policy in force and effect during theentire term of the permit. Such policies of insurance shall contain provisions which prohibitmodification, cancellation or lapse without thirty (30) days prior written notice to the City ofAvalon.

Initial
Date
I agrcc to hold harmless, indemnify and defend the City of Avalon, its officers and employeesfrom and against any and all claims, actions, damages, liabilities, expenses and judgments (including reasonable attorney’s fees) arising out ofor relating to the business or activities which I conduct pursuant to this permit.

Applicant J)t. Date_________
Date Received
:/ n
Council Action Permit Application Fee Paid ‘/ C, tttdz_ Insurance
City Mgr

CITY OF AVALON
RECVD BY: CALEGRIA 01000065198
PAYOR: DANIEL MELLO
TODAY’S DATE: 08/16/22
REGISTER DATE: 08/15/22 TIME: 13:34
DESCRIPTION AMOUNTOTHER LICENSES & PERMI $262.00
CUST ID: 1.000
TOTAL DUE: $262.00
TENDERED: $262.00
CHANGE: $.00
2-CHECK : $262.00
REF NUM: Transportation Per.

CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 AGENDA ITEM: ‘1ORIGINATING DEP: Administration CITY MANAGER:

PREPARED BY: David Hart, Community Service Supervisor
SUBJECT: First Reading of an Ordinance Amending Chapter 5-101 of Title 5 of the Avalon Municipal Code Relating to Advertising Matter and Posting on Public Property
RECOMMENDED ACTION(S): Introduce and waive all readings of an ordinance of the City of Avalon amending Chapter 5-1.01 of Title 5 of the Avalon Municipal Code Relating toAdvertising Matter and Posting on Public Property.

REPORT SUMMARY: The City’s temporary banner permit policy was established by Ordinance Number 759 in 1984. The ordinance allowed banners to be strung across the public rights-of-way for a period of no more than seven (7) days.

In 2009, this timeframe was extended to “no more than 42 days (6 weeks) preceding the event it is advertising, and shall be removed no more than three (3) days after the event it is advertising,” by Ordinance Number 1085-09.City Staff recommend amending this portion of the ordinance again to read: “The sign shall beposted in one location for no more than 42 days (six weeks). The permit shall contain a statement to this effect which must be signed by the applicant.” Additionally, City Staff recommends establishing a maximum banner size of tour (4) feet by twelve (12) feet.

GOAL ALIGNMENT: n/a
FISCAL IMPACTS: There is no fiscal impact associated with the recommended action.CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: The temporary banner permit policy will remain as it is.FOLLOW UP ACTION: Implement City Council direction.

ADVERTISING, NOTICE AND PUBLIC CONTACT: Pursuant to the Brown Act.ATTACHMENTS: Ordinance ORDINANCE NO.

AN ORDINANCE OF THE CITY OF AVALON AMENDING TITLE
5, CHAPTER 5, ARTICLE 1.01 OF THE AVALON MUNICIPAL

CODE, RELATING TO ADVERTISING MATTER AND POSTINGON PUBLIC PROPERTY WHEREAS, the promotion of events and happenings within the of City of Avalon is an important part of the Islands visitor-based economy; and WHEREAS, banners strung across the public rights-of-way are an effective means for promotion; and
WHEREAS, the City wishes to amend existing guidelines for banners strung across the public rights-of-way so as to limit the amount of time a banner may be hung in a specific location; and
WHEREAS, City Council desires to amend the Avalon Municipal Code to modify the temporary banner permit process.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF AVALON DOES ORDAIN AS FOLLOWS:

Section 1. The recitals set forth above are hereby adopted as the findings of the City Councilin connection with the adoption of this Ordinance.

Section 2. Avalon Municipal Code Title 5, Chapter 5, Article 1.01(b) is amended to read as:
(b) The City Manager shall grant a permit for such posting within three days of receipt of an application therefor upon making the following findings and subject to the following conditions:
(1) The sign will not interfere with the normal functioning of the public object on which itis proposed to be placed. (2) The sign will not interfere with or obstruct the view of any public or official sign or notice.
(3) The sign will not interfere with any traffic control device. (4) The sign will not create a vehicular or pedestrian traffic hazard by obscuring visibilityand line of sight, creating confusion, obstructing free movement of pedestrians or in any other manner.(5) The sign, except for banners strung across public rights-of-way, will not be posted on any tree, shrub or other living object.(6) The sign will not be posted in any residentially zoned area. (7) The sign, except for banners strung across public rights-of-way, shall not exceed two square feet in area and shall be of such design and construction as will not detach from the pole or structure under normal conditions.
(8) The-Banners strung across the public rights-of-way s1gn-shall be posted in one location for no more than 42 days (six weeks) procoding the event it is advertising, and shall be removed no moro than three days after tho ovont it is advctsThg. The permit shall contain a statement to this effect which must be signed by the applicant. i. Banners shall not exceed four (4) feet by twelve (12) feet in size and shall be constructed and designed so as not to detach from structures under normal conditions. (9) The sign shall be posted in such manner and at such location or locations or asapproved by the permit. (10) Banners strung across public rights-of-way shall only be erected by City forces andshall be restricted to the advertisement of nonpolitical community events. In the event that the City Manager declines to issue a sign permit, the applicant may, by filing a written appeal with the City Manager, appeal the decision to the City Council and suchappeal shall be heard at the next following regularly scheduled City Council meeting.

Section 3. Severability. If any section, subsection, subdivision, sentence, clause, or phrase of this Ordinance, or any part thereof is for any reason held to be unconstitutional, such decisions shall not affect the validity of the remaining portion of this Ordinance or any part thereof. The CityCouncil hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase thereof, irrespective of the fact that any one or more section, subsection, subdivision! paragraph, sentence, clause, or phrase be declared unconstitutional.

Section 4. CEQA Exemption. The City Council finds that adoption of this Ordinance is exempt from the California Environmental Quality Act (“CEQA”) pursuant to SectionlS35B (theactivity will not result in a direct or reasonably foreseeable indirect physical change in the environment) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. Moreover, the City Council finds that this Ordinance is also exempt under CEQA pursuant to Guidelines Section 15061 (b)(3) (there exists no possibility that the activity will have a significant adverse effect on the environment) because this Ordinance will not cause a change in any of the physical conditions within the area affected by the Ordinance.

Section 5. Certification. The City Clerk of the City of Avalon shall certify the passage and adoption of this Ordinance and shall cause the same, or a summary thereof, to be publishedand/or posted in the manner required by law.

Section 6. Effective Date. This Ordinance shall become effective 30 days from the date of adoption.

INTRODUCED at a regular meeting of the City Council of the City of Avalon on the 20tb day of September, 2022, by the following vote:

AYES:

NAYS:

ABSENT:

ABSTAIN:

PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of the City of Avalon on this 4d’ day of October, 2022, by the following vote:

AYES:

NAYS:

ABSENT:ABSTAIN:

Ann H. Marshall, Mayor
ATTEST:

Gabrielle Morones, Deputy City Clerk

CITY OF AVALON CITY COUNCIL
MEETING DATE: September 20, 2022 AGENDA ITEM: 3
ORIGINATING DEP: Fire Department CITY MANAGER:j241((PREPARED BY: Michael Alegria, Fire Chief SUBJECT: Purchase new ambulance
RECOMMENDED ACTION(S): Authorize the Fire Chief to purchase a new 2023 Ford E350 4x2Gasoline Powered Chassis, Cutaway Van for a not to exceed sum of $250,000.REPORT SUMMARY: Avalon Fire Department has two (2) Road Rescue Ambulances — a 2000 Ford Diesel (Rescue 6) and 2005 Ford Diesel (Rescue 4).Rescue 4 has had a series of mechanical issues, The engine has been rebuilt; however, issues regarding the motor and electrical systems have persisted.Fire personnel are working with Republic EVS in Santa Fe Springs to identify an appropriatereplacement for Rescue 4. As a part of the service agreement, Republic EVS will resell Rescue 4 to offset the cost of a new vehicle. At the time this report was authored, the approximate resale value of Rescue 4 was undetermined.Staff have received two quotes from Republic EVS:

Vehicle Type Price Including Tax, Title and Fees
2023 Ford E-350 $217,760.12 $239,643.392024 Ford E-450 $240,882.51 $265,078.01 Fire Personnel has determined that the 2023 Ford E-350 is the most appropriate vehicle for Avalon — while also being the less expensive option.

Both quotes contains a new battery powered gurney system — Stryker Power-Pro Cot 6507, Stryker Power-Loader with Mass Casualty Fastener — an approximately $74,188 additionalcost. The City of Avalon is one of the few Fire Departments that does not currently utilize anelectronic or hydraulic powered gurney system. Currently, Fire Personnel manually lift patients into and out of the ambulance. The upgraded electronic system has a 700 pound capacity and will relieve Fire Personnel from the manual burden of lifting the gurney into the future ambulance. The new system includes a 7 year service plan.

Since Fire Personnel have begun seeking quotes from qualified vendors, prices have increased significantly. As such, Staff would like to lock in a rate as soon as possible. If authorized, the City will not need to remit full payment until the ambulance is shipped to the Island — an approximate 18-24 month lead time. However, the City will be responsible for making payment on the gurney system within the current fiscal year - $51,410.

The current fiscal year budget has $250,000 for fire department vehicle replacement — fund #10245-6871.

FISCAL IMPACTS: Approximately $52,000 to be expended as budgeted in Fiscal Year 2022- 23—fund #10245-6871.CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: Costs and wait times will continue to rise and the Fire Department will not have a replacement vehicle for Rescue 4.

FOLLOW UP ACTION: Implement City Council direction.

ADVERTISING, NOTICE AND PUBLIC CONTACT: Pursuant to the Brown Act.ATTACHMENTS: Quotes from Republic EVS and Stryker. c PECIA I rv V EH CL Eç INC
Offer and Purchase Agreement for: Avalon Fire Department One (1) Medix Specialty Vehicles Type Ill ME 166 on 2024 Ford E-450 4 x 2 Gasoline Powered Chassis, Cutaway Van
All prices are quoted to included Government Factory Rebates. Rebates are subject to change. If the current Rebate amount changes or becomes unavailable. The difference per vehicle will be invoiced to the Purchaser. Pricing is subject to change if additional options are requested.

Description Uty Price Each Extended Price
One (1) Medix Specialty Vehicles Type Ill ME 1661 on 2024 1 $240,882.51 $240,882.51 Ford E-450 4 x 2 Gasoline Powered Chassis, Cutaway Van
Chassis VIN Number(s): To Be Determined After Production Start Date Tax (Based on a Rate of 10%) . 1 $24,088.25 $24,088.25
DMV Fee 1 $95.00 $95.00
Tire Fee 1 $12.25 $12.25Total Purchase Price 1 $265,078.01 $265,078.01 Date Offered: September 14, 2022
Two Hundred Sixty Five Thousand Seventy Eight Dollars and No Cents $265,078.01
Offer is based off of build quote as well as reference drawings if applicable. A final engineered build quote for customer review and approval will be provided prior to ambulance construction. Any changes requestedfrom a pre build meeting may result in additional charges.

Payment Terms: 100% payment of the contract is due at time of delivery unless otherwise specified in writing. Title for the ambulance will be delivered in Seven (7) business days or less once payment has processed through the financial institution.Delivery Terms: Delivery shall be 180 days or less after Receipt of Chassis as well as approved work order and production drawing if applicable. FOB. shall be Santa Fe Springs.Signature below represents acceptance of above contract and terms:
9/14/20 22
Date
4 EiJbL.iC EVS
Republic EVS12410 Clark St.

Santa Fe Springs, CA 90670
Avalon Fire Department Republic EVS
9/ 14/202 2
Signature Date
Printed Name
Title
SignatureGarett Adelman
Printed NameDirector of Sales
Title
420 Avalon Canyon Rd
Avalon, CA 90704
Michael Alegriamalegria citvofava Ion .com
3105100203
Brandon Grenert
To be assigned by MEDIX Fern Revised 3)16/2022
RepublicEVS
Avalon Fire Department
DEALER:

CUSTOMER:

Street or p o Box
City. State. Zip
Customer Contact’
Customer Email’
Customer Phone #.

Sates Associate:

Sales Engineer:

VIN#:

Received
Sent for Approval
Reed Approved
Scheduled
GPC Number:

Chassis Model Yr 2023
MEDIX Model Type III 166
CHASSIS Ford E-450 XL Cutaway) 7.3L Gas, 158” WB, 14,500 GVWR BODY 16B’L x 94W x 72 Interior Headroom
NOTE
‘1*1.ül.24Le1’
‘Chassis & Conversion
Chassis Ordered Ford Race Red-OEM Color.
fl;rin1rnrniriz.rr•
1 100040 Cabinets: Laminate, High Gloss Gray
1 STD Upholstery: (Specify Color)1 STD Color: BLACK Brand: EVS 1 100010 Flooring: Lonseal, LonCoin (Raised Circles), ILOS Specify Color: Onyx 150 fl
I STD This chassis is equipped with a Gasoline Exhaust System to meet the EPA standards for Gasoline exhaust emissions I STD
Anti-Theft Device: IdleLock Ignition Security System, PN: B-IDLESOS-A for Ford E Series Chassis Only. Locate activation button to the right side of the steering wheel.Camera System: RVS Systems RVS-MV3619N-NM-02- Includes (1) 7” rear view mirror monitor, 1 STD Surface Mount back-up camera and (1) 33’ camera cable. Locate: (1) Camera mounted off lower RH corner of center rear Amber light; Monitor mounted on cab windshield rear view mirror.
1 STO All Exterior compartments coated with light gray colored rubberized polyurethane material. 1 STD Walk-through wiSliding Door. Slides behind driver’s seat Compartment Lights: Optronics ILL36CB LED Compartment lights- ALL Models 1 SID Locate: (1) Ceiling of Compt #1: (2) in Compt #2- (1) URH, (1) LLH. (1) in ceiling of Compartment #3: (2) in Compt #4/5: (1) in Compt #6 (if applicable). 1 STD Compartment #1 SS Forward: Smooth Aluminum body, ADP interior door panel, 02 “M” cylinder storage for STEEL tank, Door w/gas-strut hold-open. 1 STD Compartment #2 SS Center: Smooth Aluminum body, ADP interior door panel, Open Storage. Double Doors w/gas strut hold-opens and Seat Belt Strap.

STD Compartment #3 SS Rear: 3/4 Height. Smooth Aluminum body. ADP interior door panel, 1 M difi d Inside/Outside access. (1)- adjustable shelf. Door w/gas strut hold-open. Delete inside/outside 0 e acces.
2 STD Rear Entry Doors: Single piece laminated smooth aluminum door liner w/stainless steel center panel for black paddle handles; ADP kick panels. 9/14/2022 10:55AM Page 1 of 6
Compartment #4/5 CS Forward ND body above floor, ADP interior door panel, ALS Cabinet w/ 1 STD Inside/Outside access, Full-height, single Door w/gas strut hold-open. Bottom section smooth aluminum body w/roIl-out battery tray w/removable, latching door.

Compartment #7: CS rear, smooth Aluminum body. Open Storage, Single access door 1 99 2126
with gas-strut hold-open. No shelf. Sealed access to paddle handles in door panel. (1) LED light in ceiling. Installed between CS rear wheelwell and compartment #6 IATS.

NOTE: ME-166 Type III Only.

Curbside Entry Door: Single piece, laminated smooth aluminum door liner w/stainless steel 1 STD center panel for black and chrome paddle handles; ADP kick panels. Gas strut door hold-open.

Smooth aluminum stepwell w/Dri-Dek insert.
1 STD Compartment #6 CS Rear: smooth aluminum body, Vertical backboard storage w/2 belts. Door w/gas strut hold-open.

All Entry Door paddle handle and rotary latching components will include emergency door 1 STD releases located top and bottom of each door and shall meet the FMVSS 206 30G Test Requirement
Power Door Locks: All Entry and Compartment Doors, wired to OEM door lock system.

I 200200A (Does not include additional lock switches inside module) NOTE: Not for use on MSV-lI Mods.

Power Door Locks: Stealth Switch on Ford, Power Door Lock System, Push Button 1 99-0678E Switch (Grille bracket on E-series: Ford 33-1 02402; F-series: 33-115626) LOCATION:_Standard_position_in_front_grille_area
1 STD Rear Bumper: ADP corner pods w/Dock bumper pads, Center grip-strut flip-up step, powder coated steel frame 2 STD IV Hangers: (2) Cast black rubber fold-down over knee area of Cot and Squad Bench3 STD Mirrors, OEM: (1) each cab door, (1) on interior windshield I STD Wheel Covers: Stainless steel covers w/Valve Extenders 4 STD Stone Guards: lower body corners, ADP
1 STD Kick Plate, Rear: ADP, below rear doors across to corner posts.1 STD Rub Rails: C-Channel, tapered ends, Lower Body off-set mount with neoprene spacers. 2 STD Running Boards: Aluminum diamond plate w/splash guards. 1 STD Fender Flares: Black rubber1 STD Fuel Fill: Cast aluminum fuel fill bezel.

STD Insulation: Pink, double sided radiant barrier/acoustic material, installed on curbside and streetside rear wheel wells.

I STD Insulation: Spray in place foam applied to curbside entry step well and both rear wheel wells 1 STD Undercoating: Per Q\JM Guidelines
fl:171 .t-UI iii:flZIJ’3Rgjjfl4.

I STD Lights: DOT, Brake/Tail, Turn. Back Up: Whelen 600 Series LED.

DOT Marker Lights: TecNiq LED, rubber grommet bezels: (7) S34-AC09-1 Amber- (5) on front 1 STD of body as Marker lights. (2) side facing on rear extrusions as Turn Signals; (7) S34-RC9O-1 Red (5) on rear of Body as Marker lights, (2) side facing as Turn Signals.

Lights: DOT, Brake and Turn, Interior, LED, Under rear overhead cabinet, Two (2) CPI 1 300100 amber marker style wired to turn signals; One (1) CPI red marker style wired to brake circuit.
fl rnrti .ini’u min’mrm i.ni’inilrnni ri
1 STD Battery Switch, Automatic: TST CDR-400. Located in Electrical Cabinet. 2 STD Batteries: OEM Locate: (1) Under hood! (1) In roll-out tray in Compartment #4/5 9/14/2022 10:55 AM Page 2 of 6
Electrical: Battery System, (1) Additional, 750 CCA. with Dual Roll-out Tray and Emergency Start Switch.

Locate: In dual battery tray in sealed compartment below ALS. The standard battery under 1 99 0142 the hood is to be isolated as “Chassis Only’ battery. The (2) batteries in the roll-out tray are to be “Conversion Only’. There will be a switch in front console labeled ‘Emerg Start PN:MX09128. Requires 200-amp continuous duty solenoid and isolator, PowerEngineering PST-SBI-3112.

NOTE: Ford E Series Type Ill Only.

Front Console/ Switch Panel: Formed Aluminum body powder coated black ard attached to chassis floor. Switch panel: Engraved black plastic with LED lighted switches for Emergency 1 STD Master, Primary/Secondary Modes, Siren/Horn, Left, Rear and Right Floods, Back-Up Alarm, Module Disconnect. Siren mounted in engraved panel below switches.

NOTE: Front switch panel will include a Battery Emergency Start switch per option above.USB Port: Kussmaul 091-219-N dual USB port mounted in switch panel. Fits into 1 99-0988 standard switch slot. IATS
LOCATION: front console switch panel
2 STD Antenna, Radio Coax Cables: Terminated behind driver’s seat w/Power & Ground for each 10 STD Dome Lights: LED w/chrome flange, 2-banks of five (5) lB-diodes w/chrome flange MXBOEHZA , switched separately with Hi/Lo functions.
1 STD Action Area Light: Whelen PSCOADCR, 12 VDC LED Strip light, 6 diodes and On/Off switch on rear control panel
1 STD USB Port: Vanner VSS-USB dual port 2Amp mounted on A/A wall 1 STD Shoreline: 125 VAC, 20-Amp, 60 Hz, straight blade inlet w/hinged, weatherproof cover, located above Compartment #2 SS1 STD Timer: 5-minute check-out, wired to CS High mode dome lights Switching: Power Door Locks Only, (2) door lock switches, MX09145: (1) located in a 1 99 0754
horizontal 2-switch Positron panel, MXOI 564, in standardized position on Curbside Wall above head of bench; (1) located in single-position Positron switch panel, MX01534, onwall at curbside rear entry door in standardized position.

Switching: Timer, Momentary 15-Minute timer switch for patient compartment dome 1 99 0550 A lights. Locate switch in Positron switch panel in standard position on curbside wall. (PNs:
- MX09150 switch, MX09151 Timer, MXO15II one position switch panel.) NOTE: A-Line Models Only
inverter: Vanner LSCII-1100- llOOwatt with 3-Stage SSAmp battery charger, 2OAmp power supply and built in GFI. Remote controlled with switch in the rear switch panel. (This 1 400160 option deletes the GEl in the AlA wall). ILOS NOTE: OPTION 99-1 955 IS REQUIRED WHEN ANY INVERTER IS MOUNTED IN ANY BULKHEAD or INTERIOR ENCLOSED CABINET. OPTION 99-2899 DUAL FANS REQUIRED ON RP-9OES and 150 MODELS.

Location: Cabinet E
Electrical: Fan, Mechantronics Fan, (1) Axial 120x25MM I2VDC ventilation fan PN:
1 99-1955 E122SEI2AB-FSR mounted on cabinet door or side wall when any inverter is mounted in an interior, enclosed cabinet.
1 STD Breaker Box: 125 VAC w/20-Amp Breaker located behind the driver’s seat base. GFI receptacle located on the Acton Area wall. 3 STD 12 VDC Outlets: (1) in Action Area, (1) in ALS Cabinet, (1) in 2nd Action Area 3 STD 125 VAC Outlets: Duplex, located (1) in Action Area, (1) in ALS, (1) in 2nd Action Area Rear Switch Panel: Engraved black plastic panel with (10) LED lighted switch positions for 1 STD Dome Lights (2), Vacuum (1), Vent (1), A.A. Light (1), lnverter (1), Spare switches and digital clock w/Mode Buttons. MX01517.
1 STD Electrical Cabinet: Located over cabin-module connection w/latching, recessed, vented door 9/14/2022 10:55 AM Page 3 of 6
Electrical: Prewire, (1) 8AWG - 12VDC ignition, power and ground from battery to a Blue 1 99 1957 Sea PN: 5032 ST Blade Split Buss “12” Fuse block —two isolated groups of six circuit fuses with cover for “Battery Hot” and “Ignition Hot” wiring.

NOTE: Behind driver seat
fll’A’PUil if9,.i.TW:tii
Lights: Warning, Whelen LED EMERGENCY Lighting Package- Ford, Chevy Type I and I STD Type Ill- Models ONLY.

NOTE:_Does_not_include_LED_Scene_Lights.

All LED lights shall have CLEAR Lenses. All emergency and scene lighting shall have chrome flanges in standard locations.

Front of Body: Add (7) Whelen 900 Series Super-LEDs- Specify pattern by LED Color (5) Red and (2) White: R-W-R-W-R-W-R (4) Red and (3) White. Outer (2) lights and (1) Center light flash on K-Spec flasher. Inner (4) flash independently on Light Bar switch on frontconsole, Sides of Body: (4) Whelen 900 Series Red Super-LEDs: (2) each side in upper corners Rear of Body: (4) Whelen 900 Series Red Super-LEDs: (2) in upper outboard corners: (2) MidBody wired as Warning/Brake at the window level: (1) Whelen 900 Series Amber Super-LED in the center position over the rear doors,
Brake,_Turn_&_Back-Up_Lights:_Whelen_600_Series_LEDs
Lights, Warning, Intersection Lights: (2) Whelen 700 Red Series Super-LEDs on front fenders 2 STD Lights, Warning, Grille: LINZ6R Red LED w/clear lenses & chrome flanges on center grille bar NOTE Grille lights to be wired to steady burn in primary only to meet California requirements.

Lights: Scene/Load, Whelen 900 Series Super-LED 9SCOENZR Gradient Opti-ScenelightTM 6 500127 with chrome flange- ILOS Halogen
Specify Locations:Both sides and rear of mod
1 STD Flasher: Dual mode flasher for Warning Light system: Vanner 98BOGCPE 2 STD Siren Speakers: Dual 100 Watt drivers mounted through the front bumper 1 STD Siren: Whelen 295 SLSA1, 200 Watt
fl
3 STD Oxygen Outlets: Quick-connect style, (2) in Action Area: (1) over Squad Bench 1 STD Suction Aspirator System: Rico disposable container mounted in Action Area w/gauge and quick-connect; SSCQR vacuum pump mounted in lower bulkhead hallway cabinet 1 STD Oxygen Cylinder Retention: For “M” cylinder: black steel w/3-spring buckle straps and top collar, located in Compartment #11 STD 02 Regulator: Amvex, SOpsi, pre-set fl
HVAC System: High capacity ProAir. brushless free blow combination Heat-AC system with 1 STD digital thermostat control on the action area wall. HVAC unit mounted in front bulkhead above the tech seat,
fl
1 STD Main Streetside Wall Cabinets: Specify desired configuration0 STD Full Wall of Cabinets Streetside Cabinet Configuration shall include a CPR Seat with Pro-4 seat belt system.

The seat belt system shall include a custom contoured seat back, a single click Pro-4 seat I OPT belt, custom pads on the upper straps for shoulder comfort and a heat embossed Medix LOGO at the head area. There shall be a 2nd Action Area, which includes (1) 125VAC and (1) I2VDC outlet, located aft of the CPR_seating_area.

Main Wall Cabinets will have (1) adjustable shelf in each and sliding polycarbonate doors with fullheight extruded handles. See Prints for Configuration. 9/14/2022 10:55 AM Page 4 of 6
1 STD Action Area Overhead Cabinet: Single cabinet full-height/full-depth of Action Area with sliding polycarbonate doors and full height extruded handles.

Action Area and Switch Panel: Laminated, sealed counteilop and vertical ALUMINUM panel 1 STD with Suction system collection canister, Vacuum gauge, (2) Oxygen outlets, (1) USB, (1) 12VDC Outlet, (1) 125VAC Outlet and digital Thermostat. Switch panel MX01517 includes (10) switch positions and digital clock w/Mode Buttons.
1 DEL DELETE: Inside/Outside access to Compartment #3: With dual 1/2’ Acrylic hinged doors w/non-locking_Eberhard two_point_paddle_latches.1 STD Bulkhead Wall Cabinets: 1-IVAC cabinet above Tech Seat; Electrical Cabinet located above cabin-module connection w/hinged, latching, vented door Bulkhead Cabinets: Upper cabinet- general storage w/hinged, latching door; Lower cabinet 1 STD general storage w/hinged, latching, vented door and location for inverter and vacuum pump on floor.
1 STD Cabinet Above ALS: Open storage w/dual 1/2’ Acrylic doors w/non-locking two-point paddle latches, (1) adjustable shelf.

ALS Cabinet: Combine Lower and Middle to create a single opening with dual, full height 1 99 3185 1/2’ Acrylic doors, non-locking doors with Two Point Paddle Latches, one per door, and (2) Adjustable Shelves. ILOS NOTE: RP-9OES, ME-I 50/1 53 and 166 Models Only.Glove Box Holders: (3) with hinged, black Ilga steel powder-coated door, above Curbside 1 99-0798 Entry Door.

NOTE:_DELETES_STATIC_VENT OVER_SIDE_ENTRY_DOOR
1 99 2261 Cargo Net: Head of squad bench- Type Ill BL-90/BLW-90 Models ONLY. Mounting plate is standard at head of squad bench.1 STD Squad Bench:
1 Full length hinged lid w/TriMark latch for access to interior storage; Full length upholstered seat cushion except over Sharps/Waste Area. 2) EVS Pro-4 seat belt system seating positions. The seat belt positions shall include a custom 2 contoured seat back, a single click Pro-4 seat belt, custom pads on the upper straps for shoulder comfort, a custom retractor for securing a secondary patient and a heat embossed Medix LOGO at the heat area.
1 STD Sharps/Waste: Drop-in style with aluminum, powder coated red, hinged lid and standard containers, located at head of squad bench.1 STD Cabinet, Squad Bench Overhead: with (2) flip-up 1/2” Acrylic doors and Eberhard two point paddle latches with constant torque hinges.1 STD Cabinet, Rear Overhead: Cabinet over rear door opening with (1) flip-up 1)2’ Acrylic door and (2) round SouthCo latches.

Technicians Seat: An EVS Rear facing custom contoured, automotive style! high back seat 1 STD with the Pro-4 seat belt system mounted on an EVS structural steel base. The seat belt system shall include a custom automotive style seat, a single click Pro-4 seat belt, custom pads on the upper straps for shoulder comfort and a heat embossed Medix LOGO at the head area. 1 STD Seat Base: EVS CS-Side storage base for EVS Technician’s Seat 1 STD Assist Rail: overhead off-center toward Streetside of unit. 3 STD Grab handles: 12” x 1.25 dia. stainless steel mounted on each rear entry and curbside entry door 1 STD Reflective Striping, Door Open Protection: .50” Red reflective striping around interior door pan of all body doors. fl
Cot Mount: Customer supplied, Install Stryker Power Load or Performance Load systems, 1 99-0728 ILOS. NOTE: Includes wiring for charging system when included with system.

Mounting Location: middle position
9/14/2022 10:55AM Page5of6
1 900075 Cot Mount: Cot Safety Hook, Install at rear threshold. Must Specify: (Stryker) fl flfflflnrni
Paint: Body Only, Custom Color to Match Chassis
Color: Ford Race Red PPG 926415
1 1000080 Configuration: Entire Body
NOTE: Requires Paint Color and Code Prior to submitting order. Paint spray samples must be approved prior to scheduling.

Windows: Privacy tint, dark vinyl applied to all three entry module entry door windows. 1 99 2184 PER CALIFORNIA ORDERS - TINT TO BE 3% OVER NORMAL TINTED WINDOWS ON MODULE ENTRY DOORS -TO BE 3% GRADE.

NOTE: Module application only.

I SPL Graphics to be done by Grayson

SHIP LOOSE
2 STD Fire Extinguisher: (2) 5 Ib- Ship Loose is Standard

TOTAL ORDER
I have reviewed this Order and find it to be acceptable and ready to buildS
Date:

Dealer Signature
I have reviewed this Order and find it to be acceptable and ready to build with the addition of the attached, approved changes.

Date:

Dealer Signature
NEW
Please chek the link below to complete the Medix Purchase Agreement Standard Terms & Conditions.

Please note, your order will not be accepted without receipt of the signed Terms & Conditions.

Mcdix Purchase Agreement Standard Terms & Conditions for Sale Due to on-going product improvements and the changing requirements of the ambulance industry, MEDIX Specially Vehicles, lnc reserves the right to change product specifications and related products without prior notice and without any obligation to change prior products or parts. ALL PATENTS RIGHrS RESERVED.Product quotes are sublect to change. Purchase Price will be the published price tist within Quotel0rder Entry System on the date of order acceptance by company 9/14/2022 10:55 AM Page 6 of 6
Description Qty Price Each Extended Price
One (1) Medix Specialty Vehicles Type Ill RP-90 on 2023 1 $217,760.12 $217,760.12Ford E-350 4 x 2 Gasoline Powered Chassis, Cutaway Van Chassis VIN Number(s): To Be Determined After Production Start Date Tax (Based on a Rate of 10%) 1 $21,776.01 $21,776.01
DMV Fee 1 $95.00 $95.00
Tire Fee 1 $12.25 $12.25
Total Purchase Price 1 $239,643.39 $239,643.39
Date Offered: September 14, 2022
Two Hundred Thirty Nine Thousand Six Hundred Forty Three Dollars and Thirty Eight Cents $239,643.39
Offer is based off of build quote as well as reference drawings if applicable. A final engineered build quotefor customer review and approval will be provided prior to ambulance construction. Any changes requested from a pre build meeting may result in additional charges.

Payment Terms: 100% payment of the contract is due at time of delivery unless otherwise specified in writing. Title for the ambulance will be delivered in Seven (7) business days or less once payment has processed through the financial institution.Delivery Terms: Delivery shall be 180 days or less after Receipt of Chassis as well as approved work order and production drawing if applicable. FOB. shall be Santa Fe Springs, CA.

Signature below represents acceptance of above contract and terms:

Avalon Fire Department
9/ 14/20 2 2
Signature Date
Printed Name
Title
Republic EVS
9/ 14/20 2 2
Signature Date
Garett AdelmanPrinted Name
Director of Sales
Title
RE’tJbIC
a
EVS
Republic EVS12410 Clark St.

Santa Fe Springs, CA 90670
5PECIA LTV VEi4I(LE N,
Offer and Purchase Agreement for: Avalon Fire Department One (1) Medix Specialty Vehicles Type Ill RP-90 on 2023 Ford E-350 4 x 2 Gasoline Powered Chassis, Cutaway Van
All prices are quoted to included Government Factory Rebates. Rebates are subject to change. If the current Rebate amount changes or becomes unavailable. The difference per vehicle will be invoiced to the Purchaser. Pricing is subject to change if additional options are requested.

RepublicEVS
Chassis Model Yr 2023
MEDIX Model Metro Express RP-90 ES, Type Ill
CHASSIS Ford E-350 XL Cutaway, 7.3 L V-8 Gas, 138 WB, 11500 GVWR BODY 146”L x 90W x 68” Interior Headroom
Chassis & Conversion
:::r.IiI.il[,],
NOTE Chassis Ordered Ford Race Red-OEM Color.
fl mrnnnvrn rnz€i .
1 100040 Cabinets: Laminate, High Gloss Gray
1 STD Upholstery: (Specify Color)
1 STD Color BLACK Brand: EVS
Flooring: Lonseal, LonCoin (Raised Circles), ILOS
Color: Onyx 150
02- Body & Chassis
_______________________________________
STD
This chassis is equipped with a Gasoline Exhaust System to meet the EPA standards for Gasolineexhaust emissions NOTE: See special roof print for rooftop condenser; See special curbside wall for added backer WELD SHOP plate.
1 STD
Anti-Theft Device: IdleLock Ignition Security System, PN: B-IDLESOG-A for Ford E Series Chassis Only. Locate activation bufton to the right side of the steering wheel.

Camera System: RVS Systems RVS-MV361SN-NM-02- Includes (1) 7” rear view mirror monitor, 1 STO Surface Mount back-up camera and (1) 33’ camera cable. Locate: (1) Camera mounted off lower RH corner of center rear Amber light; Monitor mounted on cab windshield rear view mirror.
1 STD All Exterior compartments coated with light gray colored rubberized polyurethane material.1 STD Walk-through wfSliding Door. Slides behind driver’s seat Compartment Lights: Optronics ILL36CB LED Compartment lights- ALL Models 1 STD Locate: (1) Ceiling of Compt #1; (2) in Compt #2- (1) URH, (1) LLH; (1) in ceiling of Compartment #3; (2) in Compt #4/5; (1) in Compt #6 (if applicable). 1 STD Compartment #1 SS Forward: Smooth Aluminum body, ADP interior door panel, 02 “M” cylinder storage for STEEL tank. Door wfrubber socket/nylon ball hold-open.1 STD Compartment #2 SS Center: Smooth Aluminum body ADP interior door panel, Open Storage. Door w/gas strut hold-open and Seat Belt Strap. 1 99 0334 F3 Compartment #2: SS center, Drop Floor, 5” for Stair Chair storage PN: 33-10-4786 - NOTE: RP-9OES, BLW-90 Type Ill Models Only. (not for use on the 150) 1 STD Compartment #3 SS Rear: Smooth Aluminum body, ADP interior door panel, Vertical backboard storage w/2- belts. Door w12” nylon strap hold-open. 2 STD Rear Entry Doors: Single piece laminated smooth aluminum door liner w/stainless steel center panel for black paddle handles; ADP kick panels.

Avalon Fire Department
420 Avalon Canyon Rd
DEALER:

CUSTOMER:

Street orPO Box
City. State, Zip
Customer Contact
Customer Email
Customer Phone fr
Sales Associate
Sales Engineer
VIN#:

Avalon, CA 90704
Michael Alegria
malegriacityofavalon.com
3105100203
Brandon Grenert
Received
Se—i (DI Appr,vai
Recd Apr’oved
Schedued
GPO Number:

To be assigned by MEDIX Rensec 3/16/2022
8/10/2022 2:58 PM Page 1 of 6
Compartment #415 CS Forward: NO body above floor, ADP interior door panel, ALS Cabinet w/ 1 STD Inside/Outside access, Full-height, single Door w/gas strut hold-open. Bottom section smooth aluminum_body w/roll-out_battery_tray_w/removable,_latching_door.Compartment #6: CS rear, spare tire aft of rear wheel well with (1) seat belt strap. Smooth 1 200090 Aluminum with rubberized urethane coating, drop floor for tire with removable cover plate and (1) LED light in ceiling. NOTE: (no drop floor on Type I Chevy due to larger tire).

NOTE: RP-9OESES Models Only.

Curbside Entry Door: Single piece, laminated smooth aluminum door liner wlstainless steel center 1 STD panel for black and chrome paddle handles; ADP kick panels. Gas strut door hold-open. Smooth aluminum stepwell w/Dri-Dek insert.
1 STD All Entry Door paddle handle and rotary latching components will include emergency door releases located top and bottom of each door and shall meet the FMVSS 206 30G Test Requirement Power Door Locks: All Entry and Compartment Doors, wired to OEM door lock system.

I 200200A (Does not include additional lock switches inside module) NOTE: Not for use on MSV-ll Mods.

Power Door Locks: Stealth Switch on Ford, Power Door Lock System, Push Button Switch I 99-0678E (Grille bracket on E-series: Ford 33-1 02402; F-series: 33-115626) LOCATION:_Standard_position_in_front_grille_area
1 STD Rear Bumper: ADP corner pods w/Dock bumper pads, Center grip-strut flip-up step, powder coated steel frame 2 STD IV Hangers: (2) Cast black rubber fold-down over knee area of Cot and Squad Bench3 STD Mirrors, OEM: (1) each cab door, (1) on interior windshield I STD Wheel Covers: Stainless steel covers wNalve Extenders 4 STD Stone Guards: lower body corners, ADP
1 STD Kick Plate, Rear: ADP, below rear doors across to corner posts.1 STD Rub Rails: C-Channel, tapered ends, Lower Body off-set mount with neoprene spacers. 2 STD Running Boards: Aluminum diamond plate w/splash guards. 1 STD Fender Flares: Black rubber
1 STD Fuel Fill: Cast aluminum fuel fill bezel.

STD Insulation: Pink, double sided radiant barrier/acoustic material, installed on curbside and streetside rear wheel wells.

I STD Insulation: Spray in place foam applied to curbside entry step well and both rear wheel wells1 STD Undercoating: Per QVM Guidelines fl 4.
1 STD Lights: DOT, Brake/Tail, Turn, Back Up: Whelen 600 Series LED.

DOT Marker Lights: TecNiq LED, rubber grommet bezels; (7) S34-ACO9-1 Amber- (5) on front of 1 STD body as Marker lights, (2) side facing on rear extrusions as Turn Signals; (7) 534-RC9O-1 Red- (5) on rear of Body as Marker lights, (2) side facing as Turn Signals. 1 300100 Lights: DOT, Brake and Turn, Interior, LED, Under rear overhead cabinet, Two (2) CPI amber marker style wired to turn signals; One (1) CPI red marker style wired to brake circuit. fl n’rvwi -.t.v.’ii a ‘]tI1 T1V .p€ThV11 LIflhl74flTII F!II9ffi. 1 STD Battery Switch, Automatic: TST CDR-400. Located in Electrical Cabinet. 2 STD Batteries: OEM Locate:_(1)_Under_hood,_(1)_In_roll-out_tray_in_Compartment_#4/5 Electrical: Battery System, (1) Additional, 750 C,C.A. with Dual Roll-out Tray and Emergency Start Switch.

Locate: In dual battery tray in sealed compartment below ALS. The standard battery under 1 99 0142 the hood is to be isolated as ‘Chassis Only’ battery. The (2) batteries in the roll-out tray are to be “Conversion Only”. There will be a switch in front console labeled “Emerg Start” PN:MX09128, Requires 200-amp continuous duty solenoid and isolator, Power EngineeringPST-SBI-31 12.

NOTE: Ford E Series Type Ill Only.
8/10/2022 2:58 PM Page 2 of 6
Front Console: CNC cut, formed, welded and powder coated aluminum attached to floor. PNs: 44- 1 STD A1-1907 I 44-A1-2339 Switch and siren panels removable for ease of access.

NOTE: Front switch panel will include a Battery Emergency Start switch per option above.USB Port: Kussmaul 091-219-N dual USB port mounted in switch panel. Fits into standard 1 99-0988 switch slot. IATS
LOCATION: front console switch panel
2 STO Antenna, Radio Coax Cables: Terminated behind driver’s seat w/Power & Ground for each 8 STD Lights: Dome, Whelen LED, 18-diodes w/chrome flange MX8OEHZA , switched separately with Hi/Lo functions. 1 STD Action Area Light: Whelen PSCOADCR, 12 VDC LED Strip light, 6 diodes and On/Off switch on rear control panel
1 STD USB Port: Vanner VSS-USB dual port 2Amp mounted on NA wall1 STO Shoreline: 125 VAC, 20-Amp, 60 Hz, straight blade inlet w/hinged, weatherproof cover, located above Compartment #2 SS1 STD Timer: 5-minute check-out, wired to CS High mode dome lights Switching: Power Door Locks Only, (2) door lock switches, MX09145: (1) located in a 1 99 0754 horizontal 2-switch Positron panel, MX01564, in standardized position on Curbside Wall above head of bench; (1) located in single-position Positron switch panel, MX01534, on wall at_curbside_rear_entry_door_in_standardized_position.Switching: Timer, Momentary 15-Minute timer switch for patient compartment dome lights. 1 99 0550 A Locate switch in Positron switch panel in standard position on curbside wall. (PN5: MXO9ISO - switch, MX09151 Timer, MXOI5II one position switch panel.) NOTE: A-Line Models Only
Inverter: VannerLSCl2-1100- llOOwatt with 3-Stage 55Amp battery charger, 2OAmp power supply and built in GFI. Remote controlled with switch in the rear switch panel. ILOS NOTE: OPTION 99-1955 IS REQUIRED WHEN ANY INVERTER IS MOUNTED IN ANY 1 400160 BULKHEAD or INTERIOR ENCLOSED CABINET. OPTION 99-2899 iJUAL FANS REQUIRED ON RP-90E5 and 150 MODELS.

Location: Must specify location.

Fan: Ventilation, (2) Mechantronics Fan Axial 120x25MM I2VDC fan PN: E1225E12AB-FSRmounted on cabinet door or side wall when any inverter is mounted in an interior, enclosed 1 99-2899 pass-through cabinet “E.

NOTE: Required on ALL RP-9OES Models when Inverter is installed. (N/A with Stryker power load configuration bulkhead)
1 STD Breaker Box: 125 VAC w/20-Amp Breaker located behind the driver’s seat base. SF1 receptacle located on the Action Area wall. 2 STD 12 VDC Outlets: (1) in Action Area, (1) in ALS Cabinet2 STD 125 VAC Outlets, Duplex: (1) in Action Area, (1) in ALS Cabinet Rear Switch Panel: Engraved black plastic panel with (10) LED lighted switch positions for Dome 1 STD Lights (2), Vacuum (1), Vent (1), A.A. Light (1), Inverter (1), Spare switches and digital clock w/Mode Buttons. MX01517.
1 STD Electrical Cabinet: Located over cabin-module connection w/Iatching, recessed, vented door fl L’’FITflI1!T1 I ti
Lights: Warning, Whelen LED EMERGENCY Lighting Package- Ford, Chevy Type I and Type I STD III- Models ONLY.

NOTE: Does not include LED Scene Lights.

All LED lights shall have CLEAR Lenses. All emergency and scene lighting shall have chrome flanges in standard locations.

Front of Body: Add (7) Whelen 900 Series Super-LEDs- Specify pattern by LED Color (5) Red and (2) White: R-W-R-W-R-W-R (4) Red and (3) White. Outer (2) lights and (1) Center lightflash on K-Spec flasher. Inner (4) flash independently on Light Bar switch on front console.Sides of Body: (4) Whelen 900 Series Red Super-LEDs: (2) each side in upper corners Rear of Body: (4) Whelen 900 Series Red Super-LEDs: (2) in upper outboard corners, (2) MidBody wired as Warning/Brake at the window level; (1) Whelen 700 Series Amber Super-LED in the center position over the rear doors.
8/10/2022 2:58 PM Page 3 of 6
Brake, Turn & Back-Up Lights: Whelen 600 Series LEDs
Lights, Warning, Intersection Lights: (2) Whelen 700 Red Series Super-LEDs on front fenders 2 STD Lights, Warning) Grille: LINZSR Red LED w/clear lenses & chrome flanges on center grille bar NOTE Grille lights to be wired to steady burn in primary only to meet California requirements.

Lights: Scene/Load) Whelen 900 Series Super-LED 9SCOENZR Gradient Opti-ScenelightTM 4 500127 with chrome flange- ILOS Halogen
Specify Locations: both sides of mod
2 STD Lights, Load: Whelen 700 Series LED 7SCOENZR, (2) on rear 1 STD Flasher: Dual mode flasher for Warning Light system. Vanner 986OGCPE 2 STD Siren Speakers: Dual 100 Watt drivers mounted through the front bumper 1 STD Siren: Whelen 295 SLSA1, 200 Watt
fl
3 STD Oxygen Outlets: Quick-connect style. (2) n Action Area: (1) over Squad Bench 1 STD Suction Aspirator System: Rico disposable container mounted in Action Area w/gauge and quick- connect; SSCOR vacuum pump mounted in lower bulkhead hallway cabinet 1 STD Oxygen Cylinder Retention: For “M” cylinder, black steel w/3-spring buckle straps and top collar, located in Compartment #11 STO 02 Regulator: Amvex, S0psi, pre-set flrt.ii:

HVAC System: High capacity ProAir, brushless free blow combination Heat-AC system with digital thermostat control on the action area wall. HVAC unit is mounted in bulkhead at the top of the ALS. 1 STD
NOTE: Roof mounted condenser.

NOTE: To be painted red to match body.
08- Cabinets, Hardware & Miscellaneous Items
1 STD Main Streetside Wall Cabinets: Specify desired configuration0 STO Full Wall of Cabinets I OPT Cabinet Configuration- CPR Seat w/EVS V-4 seat belt system Main Wall Cabinets will have (1) adjustable shelf in each and sliding polycarbonate doors with full height_extruded handles. See Prints for_Configuration.
99-1643 Action Area: Front area countertop ONLY, stainless steel, flat panel insert.

MODIFIED NOTE: No rear countertop.
1 STD Action Area Overhead Cabinet: Single cabinet full-height/full-depth of Action Area with sliding polycarbonate_doors_and_full_height_extruded_handles.

Action Area and Switch Panel: Laminated: sealed countertop and vertical ALUMINUM panel with 1 STD Suction system collection canister, Vacuum gauge. (2) Oxygen outlets. (1) USB. (1) 12VDC Outlet. (1) 125VAC Outlet and digital Thermostat. Switch panel MX01517 includes (10) switch positions and digital clock w/Mode Buttons.
1 STD Bulkhead Wall Cabinets: Cabinet above Tech Seat- open storage w/hinged, latching door; Electrical Cabinet located over cabin-module connection w/latchinq, vented door1 STD Bulkhead Cabinets: Upper cabinet- general storage w/hinged, latching door: Lower cabinet general storage w!hinged. latching. vented door and location for inverter and vacuum pump on floor.

ALS Cabinet: Combine Lower and Middle to create a single opening with dual, full height 1 99 3185
1/2” Acrylic doors, non-locking doors with Two Point Paddle Latches one per door, and (2) Adjustable Shelves. ILOS
NOTE;_RP-SOES,_ME-150/153_and_166_Models_Only.
1 0798 Glove Box Holders: (3) with hinged, black Ilga steel powder-coated door, above Curbside Entry Door. 8/10/2022 2:58PM Page4of6
1 99 2261 Cargo Net: Head of squad bench- Type Ill BL-90/BLW-90 Models ONLY. Mounting plate is standard at head of squad bench. 1 STD Squad Bench:
.

Full length hinged lid w/TriMark latch for access to interior storage; Full length upholstered seat cushion except over Sharps/Waste Area. 2 (2) EVS V-4 Belted seating positions w/progressive foam back and head pads and (3) short bottom straps for 2nd Patient restraint 1 STD Sharps/Waste: Drop-in style with aluminum, powder coated red, hinged lid and standard containers, located at head of squad bench. 1 STD Rear Overhead: Vinyl wrapped foam header over rear doors.1 STD Technician’s Seat: EVS Rear facing automotive style chair with EVS V-4 belt system mounted on steel base w/side access to storage.1 STD Seat Base: EVS CB-Side storage base for EVS Technician’s Seat1 STD Assist Rail: overhead off-center toward Streetside of unit. 3 STD Grab handles: 12” x 1.25” dia. stainless steel mounted on each rear entry and curbside entry door 1 STD Reflective Striping, Door Open Protection: .50” Red reflective striping around interior door pan of all bod doors. n.{3IIf1It1it4’I’ktIohib
Cot Mount: Customer supplied, Install Stryker Power Load or Performance Load systems, 1 99-0729 ILOS. NOTE: Includes wiring for charging system when included with system.

Mounting Location: Middle position
fljzçrn;9jqhq.

Paint: Body Only, Custom Color to Match Chassis
Color: Ford Race Red PPG 926415
1 1000080 Configuration: Entire Body
NOTE: Requires Paint Color and Code Prior to submitting order. Paint spray samples must be approved prior to scheduling.

Windows: Privacy tint, dark vinyl applied to all three entry module entry door windows. PER CALIFORNIA ORDERS - TINT TO BE 3% OVER NORMAL TINTED WINDOWS ON MODULE 1 99-2184 ENTRYDOORS-TOBE”S%GRADE.

NOTE: Module application only.

I SPL Graphics to be done by Grayson Graphics

SHIP LOOSE
2 STD Fire Extinguisher: (2) 5 Ib- Ship Loose is Standard

TOTAL ORDER
I have reviewed this Order and find it to be acceptable and ready to build.

Date:

Customer Signature
8/10/2022 2:58 PM PageS of 6
Cot Mount: Customer supplied, Install Stryker Power Load or Performance Load systems, ILOS. NOTE: Includes wiring for charging system when included with system.

Mounting Location:
8/10/2022 2:58PM Page6of6
stryker
Proactive.

Prepared.

ProCure
ervides
Power-PRO°M XT and Power-LOAD®
*-L-Dt sstem
Increase efficiency.
2-hour
priority response callback time and 24- to 72-hourproduct turnaround arejust two of the ways we hell) youfocus more on patients and lesson equipment upkeep. ‘r
iitt:
-
•-—-—--- j;i k
111M !eft)1. IIJ
.
// - . W
4 It
.
r
:(‘:
a
When efficiency and performance are the difference between a good and a bad call, you need the right partner. Far morethan a service agreement, ProCare is confidence — that your Power-PRO and Power-LOAD cot fastener system is beingproactively maintained; that you’re getting a full life out of your investment; and that you’re getting the right OEM partsand service, at the right time.Discover the power of ProCare services. A trusted partner. A proven advantage. 9 Results that matter. Solutions
With maintenance, service, and workflow solutions thatproactively protect your Power-PRO and Power-LOAD cot fastener system, we help you get every last penny outof your investment.

Our protect and prevent programs can be upgradedto include annual batery servicing on Power-PROand one Power-LOAD battery annually with ServiceTechnician’s discretion.

Unlimited service calls, OEM parts, labor, travel, and two annual PM inspections With proper documentation. Customizable Solutions Let us create a customiaed plan that works within
your specific budget.
2 plans. 1 big plus
ProCare ProtectUnlimited service calls, OEM parts, labor, travel, and oneannual PM inspection with proper documentation.ProCare Prevent S
Deje ‘demo p00 the contract verbi age and location of cite product - Keeping everyrhng n check.

With ProCare, we take a proactive approach to preventive maintenance. Conducted by Stryker professiona].s, our inspection process helps ‘eave nothing to chance.

Base
0 Inspect the cot frame’base
EVerify all welds intact, not cracked or brokenI Verify sin bent, broken or damaged componentsI Verify all fasteners secure rj Verify no excessive damage to X-frajne guards; replace if necessary Cables I wires
Verify no damage or pinching of wiring harness, cables or lines C Check ‘outing(s) and cnnnectsois(si, verify no hanging wites o Verify no damaged connectors; replace if necessary
Cylinder
O Verily all fasteners are secure0 Verify the cylinder is adjusted so the lock nut is tight and the cot stops moving when it hits the dead stops
o Inspect for and verify that no hydraulic fluid leaks; inspect the fittings and tighten as necessary
0 Extend cylinder rod completely and wipe down rod with soft cloth and household cleaner
Electronic Controls
U Extend cot to raised position, “easure end check load heightO Verity “jog” function is operatingU Verify nigh speed raise retract is working Wear and tear
I Verify no bent, bi’oken, or damaged components
0 Verify Tic tears, cracks, or damage to the mattress,
head section. or jitter frame
o Verify all fasteners are secureU Verify siderails and safety bar operate and latch properly o Ver:fy head section, backrest, and foot section operate and lock properly
UAdjust pneumatic cylinder t’or i’ull range of mottonO Verify all welds intact, not cracked or brokenO Verify all warning labels are present and legible Hydraulics
O Inspect motor mottnt and verify that all fasteners are secure0 verify that there are no hydraulic fluid leaks o Inspect the reservoir mid verify that there are no leaks El Inspect hoses and fittings for damage or wear; replace as necessary0 Verify the hydraulic velocity fuse Manual bock-up release handle
O Verify cite manual back-up release handle functions properlyI Verify the manual hack-up release handle returns to the stowed positionVerify the base extends-retracts smoothly when the manual back-up reease handle is engaged
I With 100 pounds or snore on the cot, verify the cot does not lower when the manual back-up release handle is pulled
stryker
3800 E. Centre Ave.

Portage, Ml 49002 USA.t; 269 389 2100f; 866 795 2233
toll free; 800 327 0770
Mkt Lit-l024 26 NOV 2014 Rev A.2Copyright © 2014 Stryker Printed in USA
Settings
0 Verify the in-fastener shut-off bracket is configured properly O Verify the cot and fastener fit and fat,ctiott properlyo Verify the safety har engages the vehicle safety hook properly Switches
Verify there is no damage or wear to ei’.her switch
I Verify both switches operate correctly; replace if necessary Wheels0’ Verify wheels are free of debris
O Verify tires are in good conditionO Verify all wheels secure, rolling and swiveling properly O Check and adjust optional wheel locks
Power-LOAD Cot Fastener Systemtt
Base
0 Check and replace any loose fasteners
Battery
O check the battery terminal screws are tight torque to 9 in—It) o Check the battery and replace at Service Techinician’s discretion Wear and tear
: Check anti replace worn parts. iticudin arm covers, arm wear pads, troley top and side covers, cot release handle springs, anchor levercover, and cot guides U Check dead stop bumpers and replace if corner is damaged Cylinder
I Replace motor if motionlessO Check cylinder rod end and rep.ace if unit functions in’ manual mode with er To r LED illtonimat ed
Transfer
O Clean debris from the foot-end lock location on the transfer o Cleait debris front the top of the transfer and anchor assembliesU Clean and prevent debris accumulation from transfer roller channelsO Check for hydraulic leaks O Replace the transfer lock bearing, if due for service Functionality
U Check the load and unload functionalityO Replace V-guide rollers arid replace transfer rods if unit is difficult to roll
O Replace hit spring arnis located under crolley top cover Let’s talk.

Put your equipment in the best possiblehands. Contact your Stryker rep for a quick, complimentary quote.

This docunient is not meant to replace the Instructions for Use Carefully review a:ui’.mderatand the lnstructicns fct tise, ,nctu b ng all warnings.

Produces referenced with TM desigciation are trademarks of Stryker Products refetenced with cg designation are registered trademarks of Stryker
The iiiformaticn presented in this overview is intended to demonstrate the breadth of Stryker product offerings Always refer to the package insert,product label antt’cr user instructions before using any Stryker product. Prod ucts may not be available in all markets. Product availability is subject to theregulatory or medical practices that govern individual markets. Please contact your Stryker representative if youhave questions about the availability of Stryker products in your area.

ProCcwe® Services
Every day you count on your medical equipment to perform at its best. WithProCare Services, our people help to ensure your equipment is ready to performwhen you need it and help make it easier to get the most from your investment.When an issue arises, it is our top priority to help solve it quickly and correctly.ProCare is not just a service program. It is a partnership you can count on to giveyou one less thing to worry about, It is one more reason to feel confident you aredoing all you can for your staff and patients.

Reliable and responsive
ProCare’s true value is in the time you’ll save and hassles you canavoid when an issue arises. We’re there for you every step of theway: from diagnosing a problem to ordering parts to makingrepairs and documenting the repairs, we’ll get your equipment upand running as quickly as possible.

Results that matter .:*
stryker
rW
f
Our goal is to ensure your equipment performs as it should, when you need it, Annual preventive maintenance and priority repairsreduce equipment downtime, helping make budget managementmore predictable.

Contact us
• Dispatch your local service technician• Order Stryker OEM parts• Technical support for your Stryker equipment• Get access to Stryker equipment manuals Mkt Litl595 16 APR 2010 Rev H
Festure is available based on product apecifscatioii and cuatonilca huh of package. Visit us at n ed s e ryi Ce. s try Ic or. co ni tEased on the provisions of the service agreement and the location ofthe product. Call us at 1 -800-STRYKER stryker corporation or its affiliates own. use, or have applied fur the following tradenssrkeor service marks: Prucare, Stryker All other trademarks are trademarks of their respectiveowners or holders, copyright o 2018 Stryker Trusted partner
No one is more qualified to service and repair your equipment than us, Our technicians have the proprietary knowledge, toolsand components to care for your equipment and keep it performing — helping you achieve the full serviceable life of your equipment. plax4,rovide&you S:t fbi,,
Michael Alegria
From:

Sent:To:Subject:

Attachments:

Good afternoon Chief Alegria,
Brandon Grenert <[email protected]>
Wednesday, August 10, 2022 3:13 PM
Michael Alegria
RepublicEVS Ambulance Proposal with Stryker EquipmentRepEVS offer page -Avalon Fire 2023 E350 and Stryker Equipment.pdf; RepEVS work order - Avalon Fire 2023 RP9O E350.pdf; ProCare and Powered System Sell Sheet.pdf; Welcome to ProCare Protect.pdf
Attached is the new offer page to build the Avalon Fire Department a 2023 Medix RPSO on a Ford E350 chassis with the Stryker Equipment you requested. That equpment will be on a separate invoice per our conversation. The cost breakdown is below. Also added into this offer are the graphics added to this ambulance. This will be done at the factory.

The Stryker Power Pro Cot 6507, Stryker Power Loader with Mass Casualty Fastener and shipping -$51,410 The Pro-Care Service plan for 7 years -$22,778Total -$74,188Also attached are two things from Stryker about the Pro-Care protection plan. If you have questions about this I will getthe Stryker rep in contact with you.

Please let me know if you have any questions.

Thank you again for the opportunity to work wth you
Brandon Grenert
Regional Account ManagerM. 949-333-9648

0. 562-204-6047
A. 12410 Clark St. Santa Fe Springs, CA 90670
E. Brandonrepublicevs.com
W.Re p j b lice s.com
-aE
1

← All documents from this meeting