E.12 - Staff Report - Citywide Catch Basin Connector Pipe Screen (CPS) Inserts Installation Project NIB

Azusa City Council
August 17, 2026

Document
E.12 - Staff Report - Citywide Catch Basin Connector Pipe Screen (CPS) Inserts Installation Project NIB
Meeting
August 17, 2026
Body
Azusa City Council
Pages
3
Original file
15.2 MB
Text extracted from the city's file for reading and search. Open the original on azusa.granicus.com. That file is the official record.

APPROVE THE IMPROVEMENT PLANS AND SPECIFICATIONS FOR THE AZUSA AVE PAVEMENT

REHABILITATION PROJECT AND AUTHORIZE STAFF TO SOLICIT BIDS FOR PHASES I AND II June 2, 2024

Page 3 ends

CONSENT ITEM
E-12
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/CITY

ENGINEER
DATE: AUGUST 17, 2026
SUBJECT: CONSIDERATION OF THE CONTRACT DOCUMENTS, PLANS AND

SPECIFICATIONS FOR THE CITYWIDE CATCH BASIN CONNECTOR PIPE

SCREEN (CPS) INSERTS INSTALLATION PROJECT, AND AUTHORIZE

STAFF TO SOLICT BIDS
BACKGROUND:

The City of Azusa is subject to the requirements of the Los Angeles County Municipal Separate Storm Sewer System (MS4) Permit, which requires municipalities to implement Best Management Practices (BMPs) to reduce pollutants in urban stormwater runoff and improve water quality in local waterways. As part of the City's ongoing compliance with the MS4 Permit, the City continues to evaluate and implement stormwater pollution control measures throughout its jurisdiction.

As part of these efforts, the City’s Engineering Division solicited proposals for the Catch Basin Inventory – Phase I and Phase II projects. United Stormwater Inc. was selected for both phases to evaluate the City’s catch basins and determine whether a Connector Pipe Screen (CPS) should be installed at each location. The evaluation was conducted in accordance with Los Angeles County guidelines and applicable MS4 Permit requirements, with consideration given to site-specific conditions and the potential for stormwater pollutant discharge. The catch basin inventory and evaluation identified appropriate City and County catch basin locations for the installation of connector pipe screens within the City of Azusa.

RECOMMENDATIONS:

Staff recommends that the City Council take the following actions:
1) Approve the contract documents, plans and specifications; and Citywide Catch Basin Connector Pipe Screen (Cps) Inserts Installation Project August 17, 2026

Page 2 ends

2) Authorize staff to solicit bids for the Citywide Catch Basin Connector Pipe Screen (CPS) Installation Project.

ANALYSIS:

The proposed Citywide Catch Basin Connector Pipe Screen (CPS) Inserts Installation Project will install Connector Pipe Screen (CPS) inserts in eligible catch basins located within the City of Azusa, including catch basins owned and maintained by the City as well as those within the Los Angeles County jurisdiction located within the City's boundaries, as applicable and subject to coordination with the County. These devices are designed to capture trash, debris, and other gross pollutants before they enter the storm drain system, thereby reducing pollutant discharges to downstream receiving waters.

Installation of the CPS inserts supports the City's compliance with the Los Angeles County MS4 Permit by implementing structural BMPs that assist in meeting applicable trash reduction and stormwater quality requirements. The project also advances the City's commitment to protecting water quality, enhancing environmental stewardship, and maintaining compliance with federal, state, and regional stormwater regulations.

The project shall be completed in accordance with applicable MS4 Permit requirements, project specifications, and all relevant regulatory standards. Upon completion, the CPS inserts will become part of the City's ongoing storm drain maintenance program, with periodic inspection and cleaning to ensure continued effectiveness and regulatory compliance.

ENVIRONMENTAL CLEARANCE:

This action is categorically exempt from the requirements of the California Environmentally Quality Act (CEQA) pursuant to Section 15301 Class 1 (c) – Rehabilitation of Existing Streets and Highways. Staff have filed a Notice of Exemption with the Los Angeles County Clerk’s Office.

FISCAL IMPACT:

There is no immediate fiscal impact associated with the recommended actions. Funding for the proposed project has been included in the City's Measure W Capital Improvement Program.

Following completion of the competitive bidding process, staff will return to the City Council for consideration of a construction contract award and the associated fiscal impact. No General Fund funding is anticipated for the project.

Prepared by: Reviewed by:

Vidal Villagomez Jr. Robert Delgadillo, P.E.

Associate Engineer Director of Public Works/City Engineer Citywide Catch Basin Connector Pipe Screen (Cps) Inserts Installation Project August 17, 2026

Page 3 ends

Reviewed and Approved by:

Sergio Gonzalez
City Manager
Attachment:
1) Contract Documents, Plans and Specifications

CONTRACT DOCUMENTS

AND SPECIFICATIONS

CITYWIDE CATCH BASIN CONNECTOR PIPE

SCREEN (CPS) INSERTS INSTALLATION

PROJECT

CITY OF AZUSA

PUBLIC WORKS DEPARTMENT
213 E. FOOTHILL BLVD.

AZUSA, CA 91702-1395
BIDS ARE DUE BY SEPTEMBER 10, 2026 AT 10:00AM

TABLE OF CONTENTS
Page
00 11 16 – NOTICE INVITING BIDS...........................................................................................5 00 21 13 – INSTRUCTIONS TO BIDDERS.................................................................................8 ARTICLE 1. SECURING DOCUMENTS.............................................................................8 ARTICLE 2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS............................8 ARTICLE 3. INTERPRETATION OF DRAWINGS AND DOCUMENTS ..............................8 ARTICLE 4. PRE-BID CONFERENCE ...............................................................................9 ARTICLE 5. ADDENDA......................................................................................................9 ARTICLE 6. ALTERNATE BIDS .........................................................................................9 ARTICLE 7. COMPLETION OF BID FORMS......................................................................9 ARTICLE 8. MODIFICATIONS OF BIDS ............................................................................9 ARTICLE 9. SUBCONTRACTORS...................................................................................10 ARTICLE 10. LICENSING REQUIREMENTS...................................................................10 ARTICLE 11. BID GUARANTEE (BOND) .........................................................................10 ARTICLE 12. IRAN CONTRACTING ACT OF 2010..........................................................10 ARTICLE 13. NONCOLLUSION DECLARATION .............................................................11 ARTICLE 14. PUBLIC WORKS CONTRACTOR REGISTRATION
CERTIFICATION .....................................................................................................11 ARTICLE 15. BIDDER INFORMATION AND EXPERIENCE FORM.................................11 ARTICLE 16. WORKERS' COMPENSATION CERTIFICATION.......................................11 ARTICLE 17. SIGNING OF BIDS .....................................................................................12 ARTICLE 18. SUBMISSION OF SEALED BIDS ...............................................................12 ARTICLE 19. OPENING OF BIDS....................................................................................12 ARTICLE 20. WITHDRAWAL OF BID...............................................................................13 ARTICLE 21. BIDDERS INTERESTED IN MORE THAN ONE BID ..................................13 ARTICLE 22. SUBSTITUTION OF SECURITY.................................................................13 ARTICLE 23. PREVAILING WAGES ................................................................................13 ARTICLE 24. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS ...............13 ARTICLE 25. INSURANCE REQUIREMENTS .................................................................14 ARTICLE 26. PERFORMANCE BOND AND PAYMENT BOND
REQUIREMENTS....................................................................................................14 ARTICLE 27. SALES AND OTHER APPLICABLE TAXES, PERMITS,
LICENSES AND FEES............................................................................................14 ARTICLE 28. PERMIT AND INSPECTION FEE ALLOWANCE ........................................14 ARTICLE 29. FILING OF BID PROTESTS .......................................................................14 ARTICLE 30. BASIS OF AWARD; BALANCED BID .........................................................15 01/2024 -i- TABLE OF CONTENTS
-ii- NOTICE INVITING BIDS

TABLE OF CONTENTS
(Continued)
Page
ARTICLE 31. AWARD PROCESS....................................................................................15 ARTICLE 32. EXECUTION OF CONTRACT ....................................................................15 ARTICLE 33. QUESTIONS...............................................................................................16 00 41 43 – BID FORMS ............................................................................................................17 ARTICLE 1. INFORMATION ABOUT BIDDER .................................................................28 ARTICLE 2. LIST OF CURRENT PROJECTS (BACKLOG)..............................................31 ARTICLE 3. LIST OF COMPLETED PROJECTS – LAST THREE YEARS.......................32 ARTICLE 4. EXPERIENCE AND TECHNICAL QUALIFICATIONS
QUESTIONNAIRE...................................................................................................33 ARTICLE 5. VERIFICATION AND EXECUTION...............................................................34 00 52 13 – CONTRACT ............................................................................................................39 00 61 13 – BOND FORMS........................................................................................................43 00 72 13 – GENERAL CONDITIONS........................................................................................52 ARTICLE 1. DEFINED TERMS ........................................................................................52 ARTICLE 2. CONTRACT DOCUMENTS..........................................................................56 ARTICLE 3. PRECONSTRUCTION AND CONSTRUCTION
COMMUNICATION..................................................................................................56 ARTICLE 4. CONTRACT DOCUMENTS: COPIES & MAINTENANCE............................57 ARTICLE 5. EXAMINATION OF DRAWINGS, SPECIFICATIONS AND SITE OF WORK ...............................................................................................................57 ARTICLE 6. MOBILIZATION ............................................................................................57 ARTICLE 7. EXISTENCE OF UTILITIES AT THE WORK SITE........................................58 ARTICLE 8. SOILS INVESTIGATIONS ............................................................................59 ARTICLE 9. CONTRACTOR’S SUPERVISION ................................................................60 ARTICLE 10. WORKERS .................................................................................................60 ARTICLE 11. INDEPENDENT CONTRACTORS..............................................................60 ARTICLE 12. SUBCONTRACTS ......................................................................................60 ARTICLE 13. VERIFICATION OF EMPLOYMENT ELIGIBILITY ......................................61 ARTICLE 14. REQUESTS FOR SUBSTITUTION.............................................................61 ARTICLE 15. SHOP DRAWINGS.....................................................................................62 ARTICLE 16. SUBMITTALS .............................................................................................63 ARTICLE 17. MATERIALS ...............................................................................................63 ARTICLE 18. PERMITS AND LICENSES.........................................................................64 ARTICLE 19. TRENCHES................................................................................................64 ARTICLE 20. TRAFFIC CONTROL ..................................................................................65 -iii- NOTICE INVITING BIDS

TABLE OF CONTENTS
(Continued)
Page
ARTICLE 21. DIVERSION OF RECYCLABLE WASTE MATERIALS................................66 ARTICLE 22. REMOVAL OF HAZARDOUS MATERIALS ................................................66 ARTICLE 23. SANITARY FACILITIES..............................................................................66 ARTICLE 24. AIR POLLUTION CONTROL ......................................................................66 ARTICLE 25. LAYOUT AND FIELD ENGINEERING ........................................................67 ARTICLE 26. TESTS AND INSPECTIONS.......................................................................67 ARTICLE 27. PROTECTION OF WORK AND PROPERTY..............................................67 ARTICLE 28. CONTRACTOR’S MEANS AND METHODS...............................................68 ARTICLE 29. AUTHORIZED REPRESENTATIVES .........................................................68 ARTICLE 30. HOURS OF WORK.....................................................................................68 ARTICLE 31. PAYROLL RECORDS; LABOR COMPLIANCE ..........................................69 ARTICLE 32. PREVAILING RATES OF WAGES..............................................................70 ARTICLE 33. PUBLIC WORKS CONTRACTOR REGISTRATION ...................................71 ARTICLE 34. EMPLOYMENT OF APPRENTICES...........................................................71 ARTICLE 35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY .............72 ARTICLE 36. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS ...............72 ARTICLE 37. LABOR/EMPLOYMENT SAFETY...............................................................73 ARTICLE 38. INSURANCE...............................................................................................73 ARTICLE 39. FORM AND PROOF OF CARRIAGE OF INSURANCE ..............................76 ARTICLE 40. TIME FOR COMPLETION AND LIQUIDATED DAMAGES.........................77 ARTICLE 41. COST BREAKDOWN AND PERIODIC ESTIMATES ..................................78 ARTICLE 42. PROGRESS ESTIMATES AND PAYMENT................................................79 ARTICLE 43. SECURITIES FOR MONEY WITHHELD.....................................................80 ARTICLE 44. CHANGES AND EXTRA WORK.................................................................80 ARTICLE 45. FINAL ACCEPTANCE AND PAYMENT......................................................92 ARTICLE 46. OCCUPANCY.............................................................................................93 ARTICLE 47. INDEMNIFICATION....................................................................................93 ARTICLE 48. PROCEDURE FOR RESOLVING DISPUTES ............................................94 ARTICLE 49. CITY’S RIGHT TO TERMINATE CONTRACT.............................................98 ARTICLE 50. WARRANTY AND GUARANTEE OF WORK ............................................100 ARTICLE 51. DOCUMENT RETENTION & EXAMINATION...........................................102 ARTICLE 52. SEPARATE CONTRACTS........................................................................103 ARTICLE 53. NOTICE AND SERVICE THEREOF .........................................................103 ARTICLE 54. NOTICE OF THIRD PARTY CLAIMS........................................................103 -iv- NOTICE INVITING BIDS

TABLE OF CONTENTS
(Continued)
Page
ARTICLE 55. STATE LICENSE BOARD NOTICE ..........................................................104 ARTICLE 56. INTEGRATION .........................................................................................104 ARTICLE 57. ASSIGNMENT OF CONTRACT................................................................104 ARTICLE 58. CHANGE IN NAME AND NATURE OF CONTRACTOR’S LEGAL ENTITY..................................................................................................................104 ARTICLE 59. ASSIGNMENT OF ANTITRUST ACTIONS...............................................104 ARTICLE 60. PROHIBITED INTERESTS .......................................................................105 ARTICLE 61. CONTROLLING LAW......................................................................................105 ARTICLE 62. JURISDICTION; VENUE...........................................................................105 ARTICLE 63. LAWS AND REGULATIONS.....................................................................105 ARTICLE 64. PATENTS .................................................................................................105 ARTICLE 65. OWNERSHIP OF CONTRACT DOCUMENTS..........................................105 ARTICLE 66. NOTICE OF TAXABLE POSSESSORY INTEREST..................................106 ARTICLE 67. SURVIVAL OF OBLIGATIONS .................................................................106 SPECIAL CONDITIONS....................................................................................................107 GENERAL REQUIREMENTS........................................................................................... 127 ATTACHMENT 1 - FLEET COMPLIANCE CERTIFICATION

TECHNICAL SPECIFICATIONS

TECHNICAL PROVISIONS

LIST OF CATCH BASIN LOCATIONS

MAP OF CATCH BASIN LOCATIONS

-5- NOTICE INVITING BIDS

NOTICE INVITING BIDS
PUBLIC NOTICE IS HEREBY GIVEN that the City Council of the City of Azusa, invites sealed bids for the above stated project and will receive such bids in the office of the City Clerk, 213 E. Foothill Blvd., City of Azusa, California 91702, UP TO THE HOUR OF 10:00 AM on September 10, 2026, for the CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS INSTALLATION PROJECT (the “Project”). At said time, Bids will be publicly opened and read aloud at the City Office. Bids received after said time shall be returned unopened. Bids shall be valid for a period of 90 calendar days after the Bid opening date.

SCOPE OF WORK: The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents to construct the above stated project. All work is located in the City of Azusa.

A PRE-BID CONFERENCE will not be held.

Bids must be submitted on the City’s Bid Forms. Bidders may obtain an electronic copy of the Contract Documents from the Engineering Division at: [email protected], at a “No Fee” charge ($0.00). To the extent required by section 20103.7 of the Public Contract Code, upon request from a contractor plan room service, the City shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room.

It is the responsibility of each prospective bidder to download and print all Bid Documents for review and to verify the completeness of Bid Documents before submitting a bid. Any Addenda will be posted on the City of Azusa’s website at www.AzusaCA.gov. It is the responsibility of each prospective bidder to check the City of Azusa’s website on a daily basis through the close of bids for any applicable addenda or updates. The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Bid Documents. Information on www.AzusaCA.gov may change without notice to prospective bidders.

The California Air Resources Board (“CARB”) implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024 and apply broadly to all self-propelled off-road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the duration of the Project. Bidders must provide, with their Bid, copies of Bidder’s and ALL listed Subcontractors’ most recent, valid Certificate of Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.

Each Bid shall be accompanied by cash, a certified or cashier’s check, or Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Azusa as bid security. The bid security shall be provided as a guarantee that within five (5) working days after the City provides the successful bidder the Notice of Award, the successfulBidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with City.
-6- NOTICE INVITING BIDS
The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by City to ensure its performance under the contract.

Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Los Angeles County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this contract. A copy of these prevailing wage rates may be obtained via the internet at: www.dir.ca.gov/dlsr/
In addition, a copy of the prevailing rate of per diem wages is available at the City’s Engineering Division and shall be made available to interested parties upon request. The successful bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder to whom the Contract is awarded, and upon any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor and debarment of contractors andsubcontractors.

Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No Bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its Bid.

Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its Bid and for the duration of the contract: “Class A or C-42”.

Substitution requests shall be made within 35 calendar days after the award of the contract.

Pursuant to Public Contract Code Section 3400(b), the City may make findings designating that certain additional materials, methods or services by specific brand or trade name other than those listed in the Standard Specifications be used for the Project. Such findings, if any, aswell as the materials, methods or services and their specific brand or trade names that must be used for the Project may be found in the Special Conditions.

City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the Base Bid alone. City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the biddingprocess. -7- NOTICE INVITING BIDS
All questions relative to this project prior to the opening of bids shall be directed to Vidal Villagomez Jr. (see Instructions to Bidders). Bidders are encouraged to submit their pre-bid questions as early as possible, in writing by email to [email protected], so they can be answered in writing through an addendum if necessary. Pre-bid questions will be received up to 5:00 PM on August 31, 2026, after which they will not be answered.

END OF NOTICE INVITING BIDS
-8- INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS
ARTICLE 1. SECURING DOCUMENTS
Bids must be submitted to the City on the Bid Forms which are a part of the Bid Package for the Project. Bid and Contract Documents may be obtained electronically from the Engineering Division at: [email protected], at a “No Fee” charge ($0.00), as specified in the Notice Inviting Bids.

The City may also make the Contract Documents available for review at one or more plan rooms, as indicated in the Notice Inviting Bids. Please Note: Prospective Bidders who choose to review the Contract Documents at a plan room must contact the City to obtain the required Contract Documents if they decide to submit a bid for theProject.

The City is a Public Works Awarding Body, as defined under Title 13 California Code of Regulations section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, valid Certificates of Reported Compliance (“CRC”) for the Bidder’s fleet and for the fleet(s) of its listed subcontractors (including any applicable leased equipment or vehicles). Bidder must additionally complete and submit the Fleet Compliance Certification, included in the Bid Documents. Failure to provide a CRC for the Bidder, and for all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render the Bid non-responsive.

Addenda, if any, issued during the bid period will be sent only to those contractors who have obtained documents from the City. Any Addenda will be posted on the City’s website.

Failure to acknowledge addenda may make a bid nonresponsive and not eligible for award of the contract.

ARTICLE 2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS
At its own expense and prior to submitting its Bid, each Bidder shall visit the site of the proposed work and fully acquaint itself with the conditions relating to the construction and labor required so that the Bidder may fully understand the work, including but not limited to difficulties and restrictions attending the execution of the work under the contract. Each Bidder shall carefully examine the Drawings, and shall read the Specifications, Contract, and all other documents referenced herein. Each Bidder shall also determine the local conditions which may in any way affect the performance of the work, including local tax structure, contractors’ licensing requirements, availability of required insurance, the prevailing wages and other relevant cost factors, shall familiarize itself with all federal, state and local laws, ordinances, rules, regulations and codes affecting the performance of the work, including the cost of permits and licenses required for the work, and shall make such surveys and investigations, including investigations of subsurface or latent physical conditions at the site or where work is to be performed as may be required. Bidders are responsible for consulting the standards referenced in the Contract. The failure or omission of any Bidder to receive or examine any contract documents, forms, instruments, addenda, or other documents, or to visit the site and acquaint itself with conditions there existing shall in no way relieve any Bidder from any obligation with respect to its Bid or to the contract and no relief for error or omission will be given except as required under State law.

The submission of a Bid shall be taken as conclusive evidence of compliance with thisArticle.

ARTICLE 3. INTERPRETATION OF DRAWINGS AND DOCUMENTS
Prospective Bidders unclear as to the true meaning of any part of the Drawings, Specifications or other proposed contract documents may submit to the Engineer of the City a written request for -9- INSTRUCTIONS TO BIDDERS
interpretation. The prospective Bidder submitting the request is responsible for prompt delivery.

Interpretation of the Drawings, Specifications or other proposed contract documents will be made only by a written addendum duly issued and a copy of such addenda will be mailed or delivered to each prospective Bidder who has purchased a set of Drawings and Specifications. The City will not be responsible for any other explanation or interpretations of the proposed documents. If a Prospective Bidders becomes aware of any errors or omissions in any part of the Contract Documents, it is the obligation of the Prospective Bidder to promptly bring it to the attention of the City.

ARTICLE 4. PRE-BID CONFERENCE
A PRE-BID CONFERENCE will not be held.

ARTICLE 5. ADDENDA
The City reserves the right to revise the Contract Documents prior to the Bid opening date.

Revisions, if any, shall be made by written Addenda. All Addenda issued by the City shall be included in the Bid and made part of the Contract Documents. Pursuant to Public Contract Code Section 4104.5, if the City issues an Addendum which includes material changes to the Project less than 72 hours prior to the deadline for submission of Bids, the City will extend the deadline for submission of Bids. The City may determine, in its sole discretion, whether an Addendum warrants postponement of the Bid submission date. Each prospective Bidder shall provide City a name, address, email address, and facsimile number to which Addenda may be sent, as well as a telephone number by which the City can contact the Bidder. Copies of Addenda will be furnished by email, facsimile, first class mail, express mail or other proper means of delivery without charge to all parties who have obtained a copy of the Contract Documents and provided such current information. Please Note: Bidders are responsible for ensuring that they have received any and all Addenda. To this end, each Bidder should contact the Engineering Division to verify that it has received all Addenda issued, if any, prior to the Bid opening. The Bidder shall indicate the Addenda received prior to bidding in the space provided in the Bid Form. Failure to indicate all Addenda may be sufficient cause for rejecting theBid.

ARTICLE 6. ALTERNATE BIDS
If alternate bid items are called for in the Contract Documents, the time required for completion of the alternate bid items has already been factored into the Contract duration and no additional Contract time will be awarded for any of the alternate bid items. The City may elect to include one or more of the alternate bid items, or to otherwise remove certain work from the Project scope of work. Accordingly, each bidder must ensure that each bid item contains a proportionate share of profit, overhead, and other costs or expenses which will be incurred by thebidder.

ARTICLE 7. COMPLETION OF BID FORMS
Bids shall only be prepared using copies of the Bid Forms which are included in the Contract Documents. The use of substitute Bid Forms other than clear and correct photocopies of those provided by the City will not be permitted. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting “N/A” where applicable), and initial all interlineations, alterations, or erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms nor make substitutions thereon. USE OF BLACK OR BLUE INK, INDELIBLE PENCIL, OR A TYPEWRITER IS REQUIRED. Deviations in the Bid Forms may result in the Bid being deemed non-responsive.
-10- INSTRUCTIONS TO BIDDERS
ARTICLE 8. MODIFICATIONS OF BIDS
Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall not delete, modify, or supplement the printed matter on the Bid Forms, or make substitutions thereon.

Oral, telephonic and electronic modifications will not beconsidered.

ARTICLE 9. SUBCONTRACTORS
Bidder shall set forth the name, address of the place of business, and contractor license number of each subcontractor who will perform work, labor, furnish materials or render services to the bidder on said contract and each subcontractor licensed by the State of California who, under subcontract to bidder, specially fabricates and installs a portion of the Work described in the Drawings and Specifications in an amount in excess of one half of one percent (0.5%) of the total bid price, and shall indicate the portion of the work to be done by such subcontractor in accordance with Public Contract Code Section 4104.

ARTICLE 10. LICENSING REQUIREMENTS
Pursuant to Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, all bidders must possess proper licenses for performance of this Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Business and Professions Code Section 7028.5, the City shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the City shall reject the Bid. The City shall have the right to request, and Bidders shall provide within ten (10) calendar days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder’s subcontractors, before awarding the Contract.

Notwithstanding anything contained herein, if the Work involves federal funds, the Contractor shall be properly licensed by the time the Contract is awarded, pursuant to the provisions of Public Contract Code section 20103.5.

ARTICLE 11. BID GUARANTEE (BOND)
Each bid shall be accompanied by: (a) cash; (b) a certified or cashier’s check made payable to City of Azusa; or (c) a Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the Total Bid Price, made payable to City of Azusa as bid security. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. The bid security shall be provided as a guarantee that within ten (10) working days after the City provides the successful bidder the Notice of Award, the successful bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful bidder fails to comply within said time, and City may enter into a contract with the next lowest responsive responsible bidder, or may call for new bids. No interest shall be paid on funds deposited with the City. City will return the security accompanying the bids of all unsuccessful bidders no later than 60 calendar days after award of the contract.

ARTICLE 12. IRAN CONTRACTING ACT OF 2010
-11- INSTRUCTIONS TO BIDDERS
In accordance with Public Contract Code Section 2200 et seq., the City requires that any person that submits a bid or proposal or otherwise proposes to enter into or renew a contract with the City with respect to goods or services of one million dollars ($1,000,000) or more, certify at the time the bid is submitted or the contract is renewed, that the person is not identified on a list created pursuant to subdivision (b) of Public Contract Code Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Public Contract Code Section 2202.5, or as a person described in subdivision (b) of Public Contract Code Section 2202.5, as applicable.

The form of such Iran Contracting Certificate is included with the bid package and must be signed and dated under penalty of perjury.

ARTICLE 13. NONCOLLUSION DECLARATION
Bidders on all public works contracts are required to submit a declaration of non-collusion with their bid. This form is included with the bid package and must be signed and dated under penalty of perjury.

ARTICLE 14. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. To this end, Bidder shall sign and submit with its Bid the Public Works Contractor Registration Certification on the form provided, attesting to the facts contained therein. Failure to submit this form may render the bid non-responsive. In addition, each Bidder shall provide the registration number for each listed subcontractor in the space provided in the Designation of Subcontractors form.

ARTICLE 15. BIDDER INFORMATION AND EXPERIENCE FORM
Each Bidder shall complete the questionnaire provided herein and shall submit the questionnaire along with its Bid. Failure to provide all information requested within thequestionnaire along with the Bid may cause the bid to be rejected as non-responsive. The City reserves the right to reject any Bid if an investigation of the information submitted does not satisfy the Engineer that the Bidder is qualified to properly carry out the terms of the contract.

ARTICLE 16. WORKERS' COMPENSATION CERTIFICATION
In accordance with the provisions of Labor Code Section 3700, Contractor shall secure the payment of compensation to its employees. Contractor shall sign and file with the City the following certificate prior to performing the work under this Contract:

I am aware of the provisions of Section 3700 of the Labor Code, which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

The form of such Workers' Compensation Certificate is included as part of this document. -12- INSTRUCTIONS TO BIDDERS
ARTICLE 17. SIGNING OF BIDS
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.

If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom.

The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.

ARTICLE 18. SUBMISSION OF SEALED BIDS
Once the Bid and supporting documents have been completed and signed as set forth herein, they shall be placed, along with the Bid Guarantee and other required materials, in a sealed envelope, addressed and delivered or mailed, postage prepaid, to the Engineering Division of the City before the time and day set for the receipt of bids. The envelope shall bear the title of the work and the name of the bidder. No oral or telephonic bids will be considered. No forms transmitted via the internet, e-mail, facsimile, or any other electronic means will be considered unless specifically authorized by the City as provided herein. Bids received after the time and day set for the receipt of bids shall be returned to the bidder unopened. The envelope shall also contain the following in the lower left-hand cornerthereof:

Bid of (Bidder’s Name)
for the CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS

INSTALLATION PROJECT
Only where expressly permitted in the Notice Inviting Bids may bidders submit their bids via electronic transmission pursuant to Public Contract Code sections 1600 and 1601. Any acceptable method(s) of electronic transmission shall be stated in the Notice Inviting Bids. City may reject any bid not strictly complying with City’s designated methods for delivery.

ARTICLE 19. OPENING OF BIDS
At the time and place set for the opening and reading of bids, or any time thereafter, each and every bid received prior to the time and day set for the receipt of bids will be publicly opened and read. The City will leave unopened any Bid received after the specified date and time, and any such unopened Bid will be returned to the bidder. It is the bidder’s sole responsibility to ensure that its Bid is received as specified. Bids may be submitted earlier than the date(s) and time(s) indicated.

The public reading of each bid will include the following information:

A. The name and business location of the bidder.

B. The nature and amount of the bid security furnished by bidder. -13- INSTRUCTIONS TO BIDDERS
C. The bid amount.

Bidders or their representatives and other interested persons may be present at the opening of the bids. The City may, in its sole discretion, elect to postpone the opening of the submitted Bids.

The City reserves the right to reject any or all Bids and to waive any informality or irregularity in any Bid.

ARTICLE 20. WITHDRAWAL OF BID
Any bid may be withdrawn either personally or by written request, incurring no penalty, at any time prior to the scheduled closing time for receipt of bids. Requests to withdraw bids shall be worded so as not to reveal the amount of the original bid. Withdrawn bids may be resubmitted until the time and day set for the receipt of bids, provided that resubmitted bids are in conformance with the instructions herein.

Bids may be withdrawn after bid opening only by providing written notice to City within five (5) working days of the bid opening and in compliance with Public Contract Code Section 5100 et seq., or as otherwise may be allowed with the consent of the City.

ARTICLE 21. BIDDERS INTERESTED IN MORE THAN ONE BID
No Bidder shall be allowed to make, file or be interested in more than one bid for the same work unless alternate bids are specifically called for. A person, firm or corporation that has submitted a sub-proposal to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other bidders. No person, firm, corporation, or other entity may submit a sub-proposal to a Bidder, or quote prices of materials to a Bidder, when also submitting a prime Bid on the sameProject.

ARTICLE 22. SUBSTITUTION OF SECURITY
The Contract Documents call for monthly progress payments based upon the percentage of the Work completed. The City will retain a percentage of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the City will substitute securities for the amount so retained in accordance with Public Contract Code Section22300.

ARTICLE 23. PREVAILING WAGES
The City has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract. These rates are available at the Engineering Division’s Office of the City or may be obtained online at http://www.dir.ca.gov.

Bidders are advised that a copy of these rates must be posted by the successful Bidder at the job site(s).

ARTICLE 24. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Sections 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the City. The Contractorshall -14- INSTRUCTIONS TO BIDDERS
be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

ARTICLE 25. INSURANCE REQUIREMENTS
Prior to commencing work, the successful bidder shall purchase and maintain insurance as set forth in the General Conditions.

ARTICLE 26. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS The successful bidder will be required to furnish a Labor and Material Payment Bond and a Faithful Performance Bond each in an amount equal to one hundred percent (100%) of the contract price. Each bond shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and is admitted by the State of California. Each bond shall be accompanied, upon the request of City, with all documents required by California Code of Civil Procedure Section 995.660 to the extent required by law. All bonding and insurance requirements shall be completed and submitted to City within ten (10) working days from the date the City provides the successful bidder with the Notice of Award.

ARTICLE 27. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise expressly provided by the Contract Documents.

ARTICLE 28. PERMIT AND INSPECTION FEE ALLOWANCE
Notwithstanding anything contained herein, the Bid Form contains an allowance for the Contractor’s cost of acquiring traffic control permits and for construction inspection fees that may be charged to the Contractor by the Agency of Jurisdiction. The allowance is included within the Bid Form to eliminate the need by bidders to research or estimate the costs of traffic control permits and construction inspection fees prior to submitting a bid. The allowance is specifically intended to account for the costs of traffic control permits and construction inspection fees charged by the local Agency of Jurisdiction only. No other costs payable by Contractor to the Agency of Jurisdiction are included within theallowance.

ARTICLE 29. FILING OF BID PROTESTS
Bidders may file a “protest” of a Bid with the City Clerk’s Office. In order for a Bidder’s protest to be considered valid, the protest must:

A. Be filed in writing within five (5) calendar days after the bid openingdate; B. Clearly identify the specific irregularity or accusation; C. Clearly identify the specific City staff determination or recommendation beingprotested; -15- INSTRUCTIONS TO BIDDERS
D. Specify in detail the grounds for protest and the facts supporting the protest; and E. Include all relevant, supporting documentation with the protest at time offiling.

If the protest does not comply with each of these requirements, the City may reject the protest without further review.

If the protest is timely and complies with the above requirements, the City Clerk, or other designated City staff member, shall review the protest, any response from the challenged Bidder(s), and all other relevant information. The City Clerk’s Office will provide a written decision to the protestor.

The procedure and time limits set forth in this Article are mandatory and are the sole and exclusive remedy in the event of a Bid protest. Failure to comply with these procedures shall constitute a failure to exhaust administrative remedies and a waiver of any right to further pursue the Bid protest, including filing a Government Code Claim or legalproceedings.

ARTICLE 30. BASIS OF AWARD; BALANCED BID
The City shall award the Contract to the lowest responsible Bidder submitting a responsive Bid.

The lowest Bid will be determined on the basis of the Total Base Bid Price.

The City may reject any Bid which, in its opinion when compared to other Bids received or to the City’s internal estimates, does not accurately reflect the cost to perform the Work. The City may reject as non-responsive any Bid which unevenly weights or allocates costs, including but not limited to overhead and profit to one or more particular bid items.

ARTICLE 31. AWARD PROCESS
Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, the City Council may award the contract. The apparent successful Bidder should begin to prepare the following documents: (1) the Performance Bond; (2) the Payment Bond; and (3) the required insurance certificates and endorsements. Once the City notifies the Bidder of the award, the Bidder will have ten (10) working days from the date of this notification to execute the Contract and supply the City with all of the required documents and certifications. Once the City receives all of the properly drafted and executed documents and certifications from the Bidder, the City shall conduct a pre-construction conference with the Contractor and its subcontractors, and issue a Notice to Proceed to that Bidder. The Contract time will begin to run from the date of the Notice to Proceed.

ARTICLE 32. EXECUTION OF CONTRACT
As required herein the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The City may require appropriate evidence that the persons executing the Contract are duly empowered to do so. The Contract and bond forms to be executed by the successful Bidder are included within these Specifications and shall not be detached.
-16- INSTRUCTIONS TO BIDDERS
The selected Contractor shall complete the project within 90 working days of City’s Authorization to Proceed with Construction.

Working hours for this project are 7:00 a.m. to 4:00 p.m. - Monday through Friday, excluding legal holidays and weekends.

ARTICLE 33. QUESTIONS
Questions regarding this Notice Inviting Bids may be directed to:

City of Azusa
Vidal Villagomez Jr.

Associate Engineer
[email protected]
No other members of the City’s staff or City Council should be contacted about this procurement during the bidding process. Any and all inquiries and comments regarding this Bid must be communicated in writing, unless otherwise instructed by the City. The City may, in its sole discretion, disqualify any Bidder who engages in any prohibited communications.

Bidders are encouraged to submit their pre-bid questions as early as possible, in writing via email to [email protected], so they can be answered in writing through an addendum if necessary. Pre-bid questions will be received up to 5:00 P.M. on August 31, 2026, after which they will not be answered.
-17- BID FORMS

BID FORMS

0.1 Bid.

Bids will be received at the City of Azusa, 213 E. Foothill Boulevard, Azusa, CA 91702, until 10:00 A.M. on Thursday, September 10, 2026.

NAME OF BIDDER:

City of Azusa
213 E. Foothill Boulevard
Azusa, CA 91702
The undersigned hereby declare that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and all addenda, if any for the following Project:

CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS INSTALLATION

PROJECT
We hereby propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project, as described and in strict conformity with the Drawings, and these Specifications for TOTAL BASE BID PRICE indicated herein.

The undersigned acknowledges receipt, understanding, and full consideration of the following addenda to the Contract Documents:

Addenda No(s).

1. Attached is the required Bid Guarantee in the amount of not less than 10% of the Total Bid Price.

2. Attached is the completed Designation of Subcontractors form.

3. Attached is the fully executed Non-Collusion Declaration form.

4. Attached is the completed Iran Contracting Act Certification form.

5. Attached is the completed Public Works Contractor Registration Certificationform.

6. Attached is the completed Contractor’s Certificate Regarding Workers’ Compensation form.

7. Attached is the completed Bidder Information and Experience form.

8. Attached is the completed Attachment 1 - Fleet Compliance Certification form(s) -18- BID FORMS
A. BID SCHEDULE
Item
No. Item Description Unit Qty Unit Bid Price Total Bid Price 1 Mobilization, Bonds, Insurance,
Demobilization LS 1
2 Construction Safety, Traffic Control,
and Daily Cleanup LS 1
3 Furnish and install connector
pipe screen (at City
owned Catch Basin locations) as
per approved Los Angeles County
Standards. Work shall include
cleaning and removal of all debris
prior to installation, and final
cleaning and removal of all debris
upon completion of work at each
location.

EA 139
4 Furnish and install connector
pipe screen (at LACFCD owned
Catch Basin locations) as per
approved Los Angeles County
Standards. Work shall include
cleaning and removal
of all debris prior to installation, and
final cleaning and removal of all
debris upon completion of work at
each location.

EA 356
TOTAL BASE BID PRICE: $ _________________
The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work.

In case of discrepancy between the Unit Price and the Item Cost set forth for a unit basis item, the unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the “Item Cost” column, then the amount set forth in the “Item Cost” column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the UnitPrice.
-19- BID FORMS
For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and any apparent errors in the addition of lump sum and extended prices.

The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the Unit Price.

B. TOTAL BASE BID PRICE:

The undersigned agrees that this Bid Form constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after the Bid opening, or until a Contract for the Work is fully executed by the City and a third party, whichever is earlier.

The successful bidder hereby agrees to sign the contract and furnish the necessary bonds and certificates of insurance within ten (10) working days after the City provides the successful bidder with the Notice of Award.

Upon receipt of the signed contract and other required documents, the contract will be executed by the City, after which the City will prepare a letter giving Contractor Notice to Proceed. The official starting date shall be the date of the Notice to Proceed, unless otherwise specified. The undersigned agrees to begin the Work within ten (10) working days of the date of the Notice to Proceed, unless otherwise specified.

The undersigned has examined the location of the proposed work and is familiar with the Drawings and Specifications and the local conditions at the place where work is to be done.

If awarded the contract, the undersigned agrees that there shall be paid by the undersigned and by all subcontractors to all laborers, workers and mechanics employed in the execution of such contract no less than the prevailing wage rate within Los Angeles County for each craft, classification, or type of worker needed to complete the Work contemplated by this contract as established by the Director of the Department of Industrial Relations. A copy of the prevailing rate of per diem wages are on file at the City’s Administration Office and shall be made available to

TOTAL BASE BID PRICE BASED ON BID SCHEDULE TOTAL OF UNIT PRICES

FOR THE CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS

INSTALLATION PROJECT
$
Total Base Bid Price in Numbers

Total Base Bid Price in Written Form
In case of discrepancy between the written price and the numerical price, the written price shall prevail.
-20- BID FORMS
interested parties upon request.

Enclosed find cash, bidder’s bond, or cashier’s or certified check No. from the Bank in the amount of , which is not
less than ten percent (10%) of this bid, payable to City of Azusa as bid security and which is given as a guarantee that the undersigned will enter into a contract and provide the necessary bonds and certificates of insurance if awarded the Work.

The bidder furthermore agrees that in case of bidder’s default in executing said contract and furnishing required bonds and certificates of insurance, the cash, bidder’s bond, or cashier’s or certified check accompanying this proposal and the money payable thereon shall become and shall remain the property of the City of Azusa.

Bidder is an individual , or corporation , or partnership , organized under the laws of the State of .

Bidder confirms license(s) required by California State Contractor’s License Law for the performance of the subject project are in full effect and proper order. The following are the Bidder’s applicable license number(s), with their expiration date(s) and classof license(s):

If the Bidder is a joint venture, each member of the joint venture must include the required licensing information.

Sureties that will furnish the Faithful Performance Bond and the Labor and Material Payment Bond, in the form specified herein, in an amount equal to one hundred percent (100%) of the contract price within ten (10) working days from the date the City provides the successful bidder the Notice of Award. Sureties must meet all of the State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and must be authorized by the State of California.

The insurance company or companies to provide the insurance required in the contract documents must have a Financial Strength Rating of not less than “A-” and a Financial Size Category of not less than “Class VII” according to the latest Best Key Rating Guide. At the sole discretion of the City, the City may waive the Financial Strength Rating and the Financial Size Category classifications for Workers’ Compensation insurance. (signatures continued on next page)
-21- BID FORMS
I hereby certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.

Executed at , on this day of , .
(Bidders Name – Print or Type)
(Name and Title)
(Corporate Seal)
(Signature)
Names of individual members of firm or names and titles of all officers of corporation and their addresses are listed below:

Name Title
Complete Address
Phone FAX
Name Title
Complete Address
Phone FAX
Name Title
Complete Address
Phone FAX
Name Title
Complete Address
Phone FAX
-22- BID FORMS

0.2 Bid Bond
[Note: Not required when other form of Bidder’s Security, e.g. cash, certified check or cashier’s check, accompanies bid.]
The makers of this bond are, , as
Principal, and , as Surety
and are held and firmly bound unto the City of Azusa, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to City for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated , 20 , for the CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS INSTALLATION PROJECT.

If the Principal does not withdraw its Bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall in affect its obligation under this bond, and Surety does hereby waive notice of any such changes.

In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and expenses.

By their signatures hereunder, Surety and Principal hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State of California.

IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this day of , 20 , the name and corporate seal of each corporation.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal) Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
-23- BID FORMS
Notary Acknowledgment

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory Name(s) of Signer(s)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s)
Partner(s)  Limited
 General
Attorney-In-Fact
Trustee(s)
Guardian/Conservator
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed forContractor/Principal.

A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

Title or Type of Document
Number of Pages
Date of Document
-24- BID FORMS
Notary Acknowledgment

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
 General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also beattached.

END OF BID BOND
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
-25- BID FORMS

0.3 List of Subcontractors
In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 (commencing at Section 4100), Part 1, Division 2 of the Public Contract Code of the State of California and any amendments thereof, Bidder shall set forth below: (a) the name and the location of the place of business, (b) the California contractor license number, (c) the DIR public works contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and(d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Bidder in or about the construction of the work or improvement to be performed under this Contract in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price. Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.

If a Bidder fails to specify a subcontractor or if a contractor specifies more than one subcontractor for the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified to perform that portion of work and that it shall perform that portionitself.

Work to be
done by
Subcontractor
Name of
Subcontractor
Location of
Business
CSLB
Contractor
License No.

DIR
Registration
Number
% of
Work
-26- BID FORMS
Work to be
done by
Subcontractor
Name of
Subcontractor
Location of
Business
CSLB
Contractor
License No.

DIR
Registration
Number
% of
Work
(Attach additional sheets if necessary)
Name of Bidder
Signature
Name and Title
Dated
-28- BID FORMS

0.4 Bidder Information and Experience Form
ARTICLE 1. INFORMATION ABOUT BIDDER
(Indicate not applicable (“N/A”) where appropriate.)
NOTE: Where Bidder is a joint venture, pages shall be duplicated andinformation provided for all parties to the joint venture.

1.0 Name of Bidder:

2.0 Type, if Entity:

3.0 Bidder Address:

Facsimile Number Telephone Number
Email Address

4.0 How many years has Bidder’s organization been in business as a Contractor?

5.0 How many years has Bidder’s organization been in business under its present name?

5.1 Under what other or former names has Bidder’s organization operated?

6.0 If Bidder’s organization is a corporation, answer the following:

6.1 Date of Incorporation:

6.2 State of Incorporation:

6.3 President’s Name:

6.4 Vice-President’s Name(s):

6.5 Secretary’s Name:

6.6 Treasurer’s Name:
-29- BID FORMS

7.0 If an individual or a partnership, answer the following:

7.1 Date of Organization:

7.2 Name and address of all partners (state whether general or limited partnership):

8.0 If other than a corporation or partnership, describe organization and name principals:

9.0 List other states in which Bidder’s organization is legally qualified to dobusiness.

10.0 What type of work does the Bidder normally perform with its own forces?

11.0 Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:

12.0 Within the last five years, has any officer or partner of Bidder’s organization ever been an officer or partner of another organization when it failed to complete a contract? If so, attach a separate sheet of explanation:
-30- BID FORMS

13.0 List Trade References:

14.0 List Bank References (Bank and Branch Address):

15.0 Name of Bonding Company and Name and Address of Agent:
[REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
-31- BID FORMS
ARTICLE 2. LIST OF CURRENT PROJECTS (BACKLOG)
[**Duplicate Page if needed for listing additional current projects.**] Project Description of
Bidder’s Work
Completion Date Cost of Bidder’s
Work
-32- BID FORMS
ARTICLE 3. LIST OF COMPLETED PROJECTS – LAST THREE YEARS [**Duplicate Page if needed for listing additional completed projects.**] Please include only those projects which are similar enough to demonstrate Bidder’s ability to perform the required Work.

Project Name Location
(city, state)
Contact Info.
(name / phone / email)
Cost of
Bidder’s Work
-33- BID FORMS
ARTICLE 4. EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE Personnel:

The Bidder shall identify the key personnel to be assigned to this project in a management, construction supervision or engineering capacity.

1. List each person’s job title, name and percent of time to be allocated to thisproject:

2. Summarize each person’s specialized education:

3. List each person’s years of construction experience relevant to theproject:

4. Summarize such experience:

Bidder agrees that personnel named in this Bid will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the City.

Changes Occurring Since Prequalification
If any substantive changes have occurred since Bidder submitted its prequalification package for this Project, Bidder shall list them below. If none are listed, Bidder certifies that no substantive changes have occurred.
-34- BID FORMS
Additional Bidder’s Statements:

If the Bidder feels that there is additional information which has not been included in the questionnaire above, and which would contribute to the qualification review, it may add that information in a statement here or on an attached sheet, appropriately marked:

ARTICLE 5. VERIFICATION AND EXECUTION
These Bid Forms shall be executed only by a duly authorized official of the Bidder:

I declare under penalty of perjury under the laws of the State of California that the foregoing information is true and correct:

Name of Bidder
Signature
Name
Title
Date
-35- BID FORMS

0.5 Non-Collusion Declaration
The undersigned declares:

I am the of , the party making the
foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham.

The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [city], [state].

Name of Bidder
[date], at
Signature
Name
Title

0.6 Iran Contracting Act Certification.
(Public Contract Code section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or (2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:

Printed Name:

Title:

Firm Name:

Date:

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.

0.7 Public Works Contractor Registration Certification
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/PublicWorks/PublicWorks.html for additional information.

No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.1
Name of Bidder:

DIR Registration Number:

DIR Registration Expiration:

Small Project Exemption: Yes or No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:

1. Bidder shall maintain a current DIR registration for the duration of theproject.

2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Bidder
Signature
Name and Title
Dated

0.8 Contractor’s Certificate Regarding Workers’ Compensation. 1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.” I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.

Name of Bidder
Signature
Name
Title
Dated
-39- CONTRACT

CONTRACT

CITY OF AZUSA PROJECT CONTRACT

CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS)

INSERTS INSTALLATION PROJECT
THIS CONTRACT is made this day of ________ 2026, in the County of Los Angeles, State of California, by and between the City of Azusa, hereinafter called “City”, and [NAME OF CONTRACTOR] hereinafter called ‘Contractor’. The City and the Contractor for the considerations stated herein agree as follows:

ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Exhibit A, Scope of Services/Proposal, which is attached hereto for the following Project:

CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS)

INSERTS INSTALLATION PROJECT
All services for the project shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. All services shall be performed to the satisfaction of City. The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation.

ARTICLE 2. TIME FOR COMPLETION. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Schedule of Performance, Exhibit C, which is attached hereto. All work must be completed within 90 working days from the commencement date stated in the Notice to Proceed. The. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the work. [OPTIONAL] The contract may be extended for up to [WRITE OUT NUMBER](##) additional __-year extension periods, as approved by the City Manager or designee per the City Council/Utility Board approval on [ENTER DATE & attach approved staff report] unless earlier terminated as provided herein.

ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as specified in Exhibit B, Compensation Rate Schedule, which is attached hereto and includes all applicable taxes and costs.

The total compensation of the contract shall not exceed [INSERT WRITTEN DOLLAR AMOUNT] [$____________] which includes a contingency amount of $____________ without written approval of the City Manager [REPLACE ‘CITY MANAGER’ WITH ‘CITY COUNCIL’ FOR AMOUNTS AT OR OVER $50,000].

ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum of [INSERT WRITTEN DOLLAR AMOUNT] ($[INSERT NUMERICAL DOLLAR AMOUNT]) for each and every -40- CONTRACT
calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” may include but are not limited to the following:

Contractor’s Certificate of Insurance and Endorsements
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Affidavit form
Contract (including but not limited to its General Conditions and other attachments and incorporated documents)
Performance Bond
Payment Bond
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents.

All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.

ARTICLE 6. PROVISIONS REQUIRED BY LAW. Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of the California Labor Code applicable to this Project.

ARTICLE 7. TERMINATION OF AGREEMENT.
(a) Except as otherwise provided, City may terminate this contract at any time with or without cause upon providing written notice to Contractor at least ten (10) days before the effective termination date. Notice of termination will be in writing. In the event of a termination for convenience, the City, based upon work accomplished by Contractor prior to notice of such termination, shall determine the amount of fees to be paid to Contractor for such services based upon accepted practices of the Contractor’s field of work, and such finding by the City, and shall be final and conclusive as to the amount of such fee.
(b) Should the contract be terminated pursuant to this Section, Contractor shall immediately cease work except for work necessary to secure the job site and any materials not yet incorporated into the work. Once the job site is secured, Contractor shall vacate the premises. City may procure on its own terms services similar to those terminated.
-41- CONTRACT
(c) Upon termination of this Contract by City, Contractor shall transfer possession of all fixed items, including but not limited to fencing, construction trailers, and any other equipment or materials affixed to the project site, to City. Contractor shall ensure that all such items are in good working condition and free from any liens or encumbrances.

Contractor shall provide City with all necessary documentation related to the fixed items, including warranties, maintenance records, and any other relevant information.

Contractor shall also coordinate with City to facilitate the smooth handover of these items.
(d) By executing this document, Contractor waives any and all claims for damages that might otherwise arise from City’s termination under this Section.

ARTICLE 8. NONASSIGNMENT. This Contract is not assignable either in whole or in part by Contractor without the written consent of City.

ARTICLE 9. INDEMNIFICATION. Contractor shall indemnify, defend with legal counsel approved by the City, and hold harmless the City, its officers, officials, employees, and volunteers (“Indemnified Parties”) from and against all claims for and actual liabilities, losses, damages, expenses, costs (including without limitation reasonable attorney’s fees, expert fees, and all other costs and fees of litigation) of every nature relating to, arising out of or in connection with Contractor’s, its officers, agents, employees, or subcontractors (or any agency or individual that Contractor shall bear the legal liability thereof) negligence, recklessness or willful misconduct in the performance of work on and/or connected with the Project or its failure to comply with any of its obligations contained in this Contract, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the Indemnified Parties. Should conflict of interest principles preclude a single attorney from representing both the City and Contractor, or should the City otherwise find Contractor’s attorney unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation reasonable attorney’s fees, expert fees, and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the Indemnified Parties with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless, or wrongful act, omission or performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Contract.

Contractor’s obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by Indemnified Parties. However, without affecting the rights of Indemnified Parties under any provision of this Contract, Contractor shall not be required to indemnify and hold harmless Indemnified Parties for liability attributable to the sole or active negligence or willful misconduct of Indemnified Parties, provided such sole or active negligence or willful misconduct is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where Indemnified Parties are shown to have been solely or actively negligent or to have acted with willful misconduct and where Indemnified Parties’ sole or active negligence or willful misconduct accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the sole or active negligence or willful misconduct of Indemnified Parties.
-42- CONTRACT
ARTICLE 10. INSURANCE. Contractor shall provide and satisfy the insurance requirements as set forth in Exhibit D, Insurance Requirements, which is attached hereto. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section.

ARTICLE 11. NON-DISCRIMINATION. Contractor shall not discriminate in its recruiting, hiring, promotion, demotion or termination practices on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, martial status, sex, age, or sexual orientation in the performance of this contract and shall comply with the provisions of the California Fair Employment and Housing Act as set forth in Part 2.8 of Division 3, Title 2 of the California Government Code; the Federal Civil Rights Act of 1964, as set forth in Public Law 88- 352, and all amendments thereto; Executive Order 11246; and all administrative rules and regulations issued pursuant to such acts and order.

ARTICLE 12. PREVAILING WAGES. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the Work is being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement.

Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request and shall post copies at the Contractor’s principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Pursuant to Labor Code Section 1775, Contractor shall forfeit as a penalty to City the sum of not more than two hundred dollars ($200) as determined by the Labor Commissioner for each calendar, or portion thereof, for each such worker paid less than the prevailing wage rates by Consultant or by any subcontractor in addition to penalties provided for in sections1770-1782 of the Labor Code.

ARTICLE 13. DECLARATION OF POLITICAL CONTRIBUTIONS. Contractor shall, throughout the term of this Agreement, submit to City an annual statement in writing declaring any political contributions of money, in-kind services, or loan made to any member of the city council within the previous twelve-month period by the Contractor and all of Contractor's employees, including any employee(s) that Contractor intends to assign to perform the Work described in this Agreement.

ARTICLE 14. CONFLICT OF INTEREST. In the procurement of supplies, equipment, construction, and services by sub-recipients, the conflict of interest provisions in (State LCA – 24 CFR 85.36 and Non-Profit Organizations – 24 CFR 84.4), OMB Circular A-110, and 24 CFR 570.611, respectively, shall apply. No employee, officer or agent of the sub-recipient shall participate in selection, or in the award or administration of a contract supported by Federal funds if a conflict of interest, real or apparent, would be involved. -43- CONTRACT
ARTICLE 15. INDEPENDENT CONTRACTOR. Contractor is and will at all times remain as to City a wholly independent contractor. Neither the City nor any of its officers, employees, or agents will have control over the conduct of Contractor or any of Contractor’s officers, employees, agents or subcontractors, except as expressly set forth in the contract. Contractor may not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors are in any manner officers, employees, agents or subcontractors of City.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________________, 2026.

CITY OF AZUSA:

By: ______________________________
Sergio Gonzalez
City Manager
CONTRACTOR:

Name: ______________________________
By: ______________________________
(Signature)
Its: _______________________________
Title (If Corporation: Chairman, President
or Vice President)
ATTEST:

By: ______________________________
Jeffrey Lawrence Cornejo Jr.

City Clerk
APPROVED AS TO FORM:

By: ____________________________
Rachel H. Richman
City Attorney
(CONTRACTOR’S SIGNATURE MUST BE

NOTARIZED AND CORPORATE

SEAL AFFIXED, IF APPLICABLE)
-44- CONTRACT
Notary Acknowledgment

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
 General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
-45- CONTRACT
Attachments: Exhibit A – Scope of Work/Proposal
Exhibit B – Compensation Rate Schedule
Exhibit C – Schedule of Performance
Exhibit D – Project Insurance Requirements
Exhibit E – General Conditions
-46- CONTRACT

EXHIBIT A

SCOPE OF WORK/PROPOSAL
-47- CONTRACT

EXHIBIT B

COMPENSATION RATE SCHEDULE
-48- CONTRACT

EXHIBIT C

SCHEDULE OF PERFORMANCE
-43- CONTRACT

EXHIBIT D

PROJECT INSURANCE REQUIREMENTS
Without limiting Contractor’s indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide, and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to the City.

General liability insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned, or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.

Umbrella or excess liability insurance. [If required to meet higher limits]. Contractor shall obtain and maintain an umbrella liability insurance policy with limits that will provide bodily injury, personal injury, and property damage liability coverage, including commercial general liability, automobile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions:
• A drop-down feature requiring the policy to respond if any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason, other than bankruptcy or insolvency of said primary insurer; • “Pay on behalf of” wording as opposed to “reimbursement”; • Concurrency of effective dates with primary policies.

Should Contractor obtain and maintain an excess liability policy, such policy shall be excess over commercial general liability, automobile liability, and employer’s liability policies. Such policy or policies shall include wording that the excess liability policy follows the terms and conditions of the underlying policies.

Workers’ compensation insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.

Contractor shall submit to the City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City, its officers, agents, employees, and volunteers. -44- CONTRACT
Contractor’s pollution liability insurance. Coverage shall provide for liability arising out of sudden, accidental, and gradual pollution, and remediation. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. All activities contemplated in this agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for remediation of the site in the event of an environmental contamination event arising out of the materials, supplies, products, work, operations, or workmanship.

Transportation pollution liability insurance. Coverage shall be in an amount not less than $5,000,000 combined single limit per accident and shall include Pollution Liability (CA9948) and MCS-90 Endorsements. The policy shall provide coverage for transportation of pollutants/contaminants to and from the job site and the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.

Builder’s risk (course of construction). Upon commencement of construction and with approval of City, Contractor shall obtain and maintain builder’s risk (course of construction) for the entire duration of the project until only the City has an insurable interest. The builder’s risk coverage shall include the following:

The named insureds shall be Contractor and City, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. Contractor shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to the City. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the City.

The City will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an “all risk” basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to the City to ensure adequacy of terms and sub-limits and shall be submitted to the City prior to commencement of construction.

Installation floater. If required by the City or not covered by builders’ risk (course of construction) coverage, Contractor shall obtain an installation floater for the value of the property and covering the portion of the work to be constructed, installed, altered, or repaired by Contractor.

The installation floater policy must include coverage for the fixtures, materials, supplies, machinery, -45- CONTRACT
and equipment used in or incidental to the construction project as well as property kept off-site or while in transit. Coverage must include property of others in the Contractor’s care, custody, or control. In addition to Contractor, the City and all subcontractors shall be named as additional insureds on the policy with coverage extending through the final completion date.

Other provisions or requirements
Proof of insurance. Contractor shall provide certificates of insurance and required endorsements to the City as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by City’s Risk Manager prior to commencement of performance.

Current certification of insurance shall be kept on file with City for the contract period and any additional length of time required thereafter. City reserves the right to require complete, certified copies of all required insurance policies, at any time.

Duration of coverage. Contractor shall procure and maintain for the contract period, and any additional length of time required thereafter, insurance against claims for injuries to persons or damages to property, or financial loss which may arise from or in connection with the performance of the Work hereunder by Contractor, their agents, representatives, employees, or subconsultants. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. City and its officers, officials, employees, and agents shall continue as additional insureds under such policies.

Primary/noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by the City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City’s own insurance or self- insurance shall be called upon to protect it as a named insured.

Products/completed operations coverage. Products liability coverage shall extend for a minimum of three years (3) after project completion, and completed operations coverage for construction agreements shall extend for 10 years from the date of substantial completion of the project or the statute of repose, whichever is longer. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officials, officers, agents, and employees, shall be included as additional insureds under the Products and Completed Operations coverage.

City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary, and any premium paid by the City will be promptly reimbursed by Contractor or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Agreement. -46- CONTRACT
Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager.

Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees, and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City and shall require similar written express waivers and insurance clauses from each of its subconsultants.

Enforcement of contract provisions (non estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non- compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.

Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

Notice of cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide the City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. If any of the Contractor’s insurers are unwilling to provide such notice, then Contractor shall have the responsibility of notifying the City immediately in the event of Contractor’s failure to renew any of the required insurance coverages, or insurer’s cancellation or non-renewal.

Additional insured status. General liability, automobile liability, and umbrella/excess liability insurance policies shall provide or be endorsed to provide that City and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies.

Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to the City and approved of in writing.

Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
-47- CONTRACT
Pass through clause. Contractor agrees to ensure that its subconsultants, subcontractors, and any other party who is brought onto or involved in the project/service by Contractor (hereinafter collectively “subcontractor”), provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. However, in the event Contractor’s subcontractor cannot comply with this requirement, which proof must be submitted to the City, Contractor shall be required to ensure that its subcontractor provide and maintain insurance coverage and endorsements sufficient to the specific risk of exposure involved with subcontractor’s scope of work and services, with limits less than required of the Contractor, but in all other terms consistent with the Contractor’s requirements under this agreement. This provision does not relieve the Contractor of its contractual obligations under the agreement and/or limit its liability to the amount of insurance coverage provided by its subcontractors. This provision is intended solely to provide Contractor with the ability to utilize a subcontractor who may be otherwise qualified to perform the work or services but may not carry the same insurance limits as required of the Contractor under this agreement given the limited scope of work or services provided by the subcontractor. Contractor agrees that upon request, all agreements with subcontractors, and others engaged in the project, will be submitted to the City for review.

City’s right to revise requirements. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor a ninety (90)-day advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor’s compensation.

Self-insured retentions. Any self-insured retentions must be declared to and approved by City.

City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible, or require proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention through confirmation from the underwriter.

Timely notice of claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.

Additional insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
-48- CONTRACT

EXHIBIT E

GENERAL CONDITIONS
-49-

BOND FORMS

1.1 Performance Bond.

KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Azusa, (hereinafter referred to as “City”) has awarded to , (hereinafter referred to as the “Contractor”) an agreement for

CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS INSTALLATION PROJECT, (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated , (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, , the undersigned Contractor and
as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of DOLLARS,
($ ), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship.

The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.
-50- BID FORMS
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of thecontract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.

By their signatures hereunder, Surety and Contractor hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State ofCalifornia. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
-51- BID FORMS
IN WITNESS WHEREOF, we have hereunto set our hands and seals this , 20 .
(Corporate Seal)
day of
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is per thousand. The total amount of premium charges is $ .
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety
and Agent or Representative for
service of process in California)
-52- BID FORMS
Notary Acknowledgment

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
 General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.

A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
-53- BID FORMS
Notary Acknowledgment

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
 General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also beattached.

END OF PERFORMANCE BOND
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
-54- BID FORMS

1.2 Payment Bond (Labor and Materials).

KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Azusa (hereinafter designated as the “City”), by action taken or a resolution passed , 20 , has awarded to
hereinafter designated as the “Principal,” a contract for the work described as follows: CITYWIDE CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS INSTALLATION PROJECT (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and as Surety, are held and firmly bound unto the City in the penal sum of Dollars ($ ) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigationexpenses.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon thisbond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any -55- BID FORMS
fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contractbetween the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Civil Code Section 9100, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

By their signatures hereunder, Surety and Principal hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State of California.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this , 20 .
(Corporate Seal)
day of
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
-56- BID FORMS
Notary Acknowledgment

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
 General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
-57- BID FORMS
Notary Acknowledgment

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
 General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.

END OF PAYMENT BOND
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
-52- GENERAL CONDITIONS

GENERAL CONDITIONS
ARTICLE 1. DEFINED TERMS
Whenever used in the Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined below, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.

A. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or a tidal wave.

B. Addenda -- Written or graphic instruments issued prior to the submission of Bids which clarify, correct, or change the Contract Documents.

C. Additional Work -- New or unforeseen work will be classified as “Additional Work” when the City’s Representative determines that it is not covered by theContract.

D. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations, permits, and licenses of any kind, issued by local, state or federal governmental authorities or private authorities with jurisdiction (including utilities), to the extent they apply to the Work.

E. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices and other terms for the Work to be performed.

F. Bidder -- The individual or entity who submits a Bid directly to theCity.

G. Change Order (“CO”) -- A document that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Contract, in accordance with the Contract Documents and in the form contained in the Contract Documents.

H. Change Order Request (“COR”) -- A request made by the Contractor for an adjustment in the Contract Price and/or Contract Times as the result of a Contractor-claimed change to the Work. This term may also be referred to as a Change Order Proposal (“COP”), or Request for Change (“RFC”).

I. City -- The City of Azusa.

J. City Council, Council -- The City Council of the City.

K. City’s Representative -- The individual or entity as identified in the Special Conditions to act as the City’s Representative.

L. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not aClaim. -53- GENERAL CONDITIONS
M. Contract -- The entire integrated written agreement between the City and Contractor concerning the Work. “Contract” may be used interchangeably with “Agreement” in the Contract Documents. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral, and includes all Contract Documents.

N. Contract Documents -- The documents listed in Section 00 52 13, Article 5. Some documents provided by the City to the Bidders and Contractor, including but not limited to reports and drawings of subsurface and physical conditions are not Contract Documents.

O. Contract Price -- Amount to be paid by the City to the Contractor as full compensation for the performance of the Contract and completion of the Work, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs.

P. Contract Times -- The number of days or the dates stated in the Contract Documents to: achieve defined Milestones, if any; and to complete the Work so that it is ready for final payment.

Q. Contractor -- The individual or entity with which the City has contracted for performance of the Work.

R. Contractor’s Designated On-Site Representative -- The Contractor’s Designated OnSite Representative will be as identified in Section 00 72 13, Article 3 and shall not be changed without prior written consent of the City.

S. Daily Rate -- The Daily Rate stipulated in the Contract Documents as full compensation to the Contractor due to the City’s unreasonable delay to the Project that was not contemplated by the parties.

T. Day -- A calendar day of 24 hours measured from midnight to the nextmidnight.

U. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test, or approval referenced in the Contract Documents.

V. Demobilization -- The complete dismantling and removal by the Contractor of all of the Contractor’s temporary facilities, equipment, and personnel at theSite.

W. Drawings -- That part of the Contract Documents prepared by of the Engineer of Record which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Shop Drawings and other Contractor submittals are not Drawings as so defined.

X. Effective Date of the Contract -- The date indicated in the Contract on which it becomes effective, but if no such date is indicated, it means the date on which the Contract is signed and delivered by the last of the two parties to sign anddeliver.

Y. Engineer, whenever not qualified, shall mean the Director of Public Works / City Engineer of the City, acting either directly or through properly authorized agents, such -54- GENERAL CONDITIONS
agents acting severally within the scope of the particular duties entrusted tothem. On all questions concerning the acceptance of materials, machinery, the classifications of material, the execution of work, conflicting interest of the contractors performing related work and the determination of costs, the decision of the Engineer, duly authorized by the City Council, shall be binding and final upon bothparties.

Z. Engineer of Record -- The individual, partnership, corporation, joint venture, or other legal entity named as such in Section 00 73 13, Article 1.1. or any succeeding entity designated by the City.

AA.Green Book -- The current edition of the Standard Specifications for Public Works Construction.

BB.Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended from time to time or, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a class I, class II, or class III disposal site in accordance with provisions of existing law, whichever is morerestrictive.

CC. Holiday – The Holidays occur on:

New Year’s Day - January 1
Martin Luther King – Third Monday in January
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Juneteenth – June 19
Independence Day - July 4
Labor Day - First Monday in September
Columbus Day – Second Monday in October
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Christmas Day - December 25
If the Holiday should fall on a Friday, Saturday, or Sunday, then the following Monday are both Holidays.

DD. Notice of Award -- The written notice by the City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, the City will sign and deliver the Contract.

EE.Notice of Completion -- The form which may be executed by the City and recorded by the county where the Project is located constituting final acceptance of theProject.

FF. Notice to Proceed -- A written notice given by the City to Contractor fixing the date on which the Contractor may proceed with the Work and when Contract Times will commence to run.

GG. Project -- The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part.
-55- GENERAL CONDITIONS
HH. Recyclable Waste Materials -- Materials removed from the Site which are required to be diverted to a recycling center rather than an area landfill. Recyclable Waste Materials include asphalt, concrete, brick, concrete block, and rock.

II. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to facilitate scheduled performance of related construction activities.

JJ. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.

KK.Specifications -- That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto.

LL. Stop Payment Notice -- A written notice as defined in Civil Code section 8044.

MM. Subcontractor -- An individual or entity other than a Contractor having a contract with any other entity than the City for performance of any portion of the Work at the Site.

NN. Submittal -- Written and graphic information and physical samples prepared and supplied by the Contractor demonstrating various portions of the Work.

OO. Successful Bidder -- The Bidder submitting a responsive Bid to whom the City makes an award.

PP.Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment used in the performance of the Work or to be incorporated in theWork.

QQ. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

RR. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by the Contractor in its bid or as adjusted in accordance with the ContractDocuments.

SS.Warranty -- A written guarantee provided to the City by the Contractor that the Work will remain free of defects and suitable for its intended use for the period required by the Contract Documents or the longest period permitted by the law of this State, whichever is longer.

TT. Work -- The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce -56- GENERAL CONDITIONS
such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.

ARTICLE 2. CONTRACT DOCUMENTS
A. Contract Documents. The Contract Documents are complementary, and what is called for by one shall be as binding as if called for by all.

B. Interpretations. The Contract Documents are intended to be fully cooperative and complementary. If the Contractor observes that any documents are in conflict, the Contractor shall promptly notify the Engineer in writing. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:

1. Permits issued by Jurisdictional Regulatory Agencies

2. Change Orders

3. Addenda

4. Special Provisions (or Special Conditions)

5. Technical Specifications

6. Plans (Contract Drawings)

7. Contract

8. General Conditions

9. Instructions to Bidders

10. Notice Inviting Bids

11. Contractor’s Bid Forms

12. Greenbook

13. Standard Plans/Drawings

14. Reference Documents
With reference to the Drawings, the order of precedence shall be as follows:

1. Figures govern over scaled dimensions

2. Detail drawings govern over general drawings

3. Addenda or Change Order drawings govern over Contract Drawings

4. Contract Drawings govern over Standard Drawings

5. Contract Drawings govern over Shop Drawings
C. Conflicts in Contract Documents. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard, higher quality, and most expensive shall always apply.

D. Organization of Contract Documents. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing Project Work among subcontractors or in establishing the extent of Work to be performed by any trade.

ARTICLE 3. PRECONSTRUCTION AND CONSTRUCTION COMMUNICATION Before any Work at the site is started, a conference attended by the City, Contractor, City’s Representative, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to herein, procedures for -57- GENERAL CONDITIONS
handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records.

At this conference the City and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities under the Contract. Such individuals shall have the authority to transmit instructions, receive information, render decisions relative to the Contract, and otherwise act on behalf of each respectiveparty.

ARTICLE 4. CONTRACT DOCUMENTS: COPIES & MAINTENANCE
Contractor will be furnished, free of charge, five (5) copies of the Contract Documents. Additional copies may be obtained at cost of reproduction.

Contractor shall maintain a clean, undamaged set of Contract Documents, including submittals, at the Project site.

ARTICLE 5. EXAMINATION OF DRAWINGS, SPECIFICATIONS AND SITE OF WORK A. Examination of Contract Documents. Before commencing any portion of the Work, Contractor shall again carefully examine all applicable Contract Documents, the Project site, and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Engineer of any potential error, inconsistency, ambiguity, conflict, or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any subcontractor proceed with Work if uncertain as to the applicable requirements.

B. Additional Instructions. After notification of any error, inconsistency, ambiguity, conflict, or lack of detail or explanation, the Engineer will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.

C. Quality of Parts, Construction and Finish. All parts of the Work shall be of thebest quality of their respective kinds and the Contractor must use all diligence to inform itself fully as to the required construction and finish.

D. Contractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including the requirement to comply with all applicable laws, ordinances, rules and regulations, the Engineer may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.

ARTICLE 6. MOBILIZATION
A. When a bid item is included in the Bid Form for mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate (“Initial Mobilization”). When no bid item is -58- GENERAL CONDITIONS
provided for “Initial Mobilization,” payment for such costs will be deemed to be included in the other items of the Work.

B. Payment for Initial Mobilization based on the lump sum provided in the Bid Form, which shall constitute full compensation for all such Work and no additional compensation shall be made thereof.

ARTICLE 7. EXISTENCE OF UTILITIES AT THE WORK SITE
A. The City has endeavored to determine the existence of utilities at the Project site from the records of the owners of known utilities in the vicinity of the Project. The positions of these utilities as derived from such records are shown on thePlans.

B. Unless indicated otherwise on the Plans and Specifications, no excavations were made to verify the locations shown for underground utilities. The service connections to these utilities are not shown on the Plans. Water service connections may be shown on the Plans showing general locations of such connections. It shall be the responsibility of the Contractor to determine the exact location of all service connections. The Contractor shall make its own investigations, including exploratory excavations, to determine the locations and type of service connections, prior to commencing Work which could result in damage to such utilities. The Contractor shall immediately notify the City in writing of any utility discovered in a different position than shown on the Plans or which is not shown on thePlans.

C. If applicable, all water meters, water valves, fire hydrants, electrical utility vaults, telephone vaults, gas utility valves, and other subsurface structures shall be relocated or adjusted to final grade by the Contractor. Locations of existing utilities shown on the Plans are approximate and may not be complete. The Contractor shall be responsible for coordinating its Work with all utility companies during the construction of the Work.

D. Notwithstanding the above, pursuant to section 4215 of the Government Code, the City has the responsibility to identify, with reasonable accuracy, main or trunk line facilities on the plans and specifications. In the event that main or trunk line utility facilities are not identified with reasonable accuracy in the plans and specifications made a part of the invitation for Bids, the City shall assume the responsibility for their timely removal, relocation, or protection.

E. Contractor, except in an emergency, shall contact the appropriate regional notification center, California Underground Service Alert at 811 or 1-800-227-2600 or on-line at www.digalert.org at least two working days prior to commencing any excavation if the excavation will be performed in an area which is known, or reasonably should be known, to contain subsurface installations other than the underground facilities owned or operated by the City, and obtain an inquiry identification number from that notification center. No excavation shall be commenced or carried out by the Contractor unless such an inquiry identification number has been assigned to the Contractor or any subcontractor of the Contractor and the City has been given the identification number by the Contractor.

ARTICLE 8. SOILS INVESTIGATIONS
A. Reports and Drawings. The Special Conditions identify:

1. those reports known to the City of explorations and tests of subsurface conditions -59- GENERAL CONDITIONS
at or contiguous to the site; and

2. those drawings known to the City of physical conditions relating to existing surface or subsurface structures at the site (except UndergroundFacilities).

B. Limited Reliance by Contractor on Technical Data Authorized. Contractor may rely upon the accuracy of the “technical data” contained in such reports and drawings, which were expressly not created or obtained to evaluate or assist in the evaluation of constructability, and are not Contract Documents. Contractor shall make its own interpretation of the “technical data” and shall be solely responsible for any such interpretations. Except for reliance on the accuracy of such “technical data,” Contractor may not rely upon or make any claim against the City, City’s Representative, or Engineer of Record, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors, with respect to:

1. the completeness of such reports and drawings for Contractor’s purposes, including without limitation any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or

2. other data, interpretations, opinions, conclusions and information contained in such reports or shown or indicated in such drawings; or

3. any Contractor interpretation of or conclusion drawn from any “technical data” or any such other data, interpretations, opinions, or information.

ARTICLE 9. CONTRACTOR’S SUPERVISION
Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent acceptable to the City. Superintendent must be able to proficiently speak, read and write in English and shall have the authority to make decisions on behalf of the Contractor. Contractor shall continuously provide efficient supervision of theProject.

ARTICLE 10. WORKERS
A. Contractor shall at all times enforce strict discipline and good order among its employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.

B. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from the Work and shall not be employed on thisProject.

ARTICLE 11. INDEPENDENT CONTRACTORS
Contractor shall be an independent contractor for the City and not an employee. Contractor understands and agrees that it and all of its employees shall not be considered officers, employees, or agents of City and are not entitled to benefits of any kind normally provided employees of City, including but not limited to, state unemployment compensation or workers’ compensation. Contractor assumes full responsibility for the acts and omissions of its employees or agents related to the Work.

ARTICLE 12. SUBCONTRACTS
-60- GENERAL CONDITIONS
A. Contractor agrees to bind every subcontractor to the terms of the Contract Documents as far as such terms are applicable to subcontractor’s portion of the Work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor.

Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City.

B. The City reserves the right to accept all subcontractors. The City’s acceptance of any subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.

C. Prior to substituting any subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.

ARTICLE 13. VERIFICATION OF EMPLOYMENT ELIGIBILITY
By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors, sub-subcontractors and consultants to comply with the same. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor and that any of the following shall be grounds for the City to terminate the Contract for cause: (1) failure of the Contractor or its subcontractors, subsubcontractors or consultants to meet any of the requirements provided for in this Article; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.

ARTICLE 14. REQUESTS FOR SUBSTITUTION
A. For the purposes of this provision, the term “substitution” shall mean the substitution of any material, method or service substantially equal to or better in every respect to that indicated in the Standard Specifications or otherwise referencedherein.

B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that is described in the Notice Inviting Bids that designates certain products, things, or services by specific brand or trade name.

C. Unless specifically designated in the Special Conditions, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such specifications shall be deemed to be used for the purpose of facilitating the description of the material, process, or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process, or article which may be substantially equal to or better in every respect to that so indicated or specified in the Contract Documents. However, the City has adopted uniform standards for certain materials, processes, and articles.

D. The Contractor shall submit substitution requests, together with substantiating data, for substitution of any “or equal” material, process, or article no later than thirty-five -61- GENERAL CONDITIONS
(35) calendar days after award of Contract. Provisions regarding submission of substitution requests shall not in any way authorize an extension of time for the performance of this Contract. If a substitution request is rejected by the City, the Contractor shall provide the material, method or service specified herein. The City shall not be responsible for any costs incurred by the Contractor associated with substitution requests. The burden of proof as to the equality of any material, process, or article shall rest with the Contractor. The Engineer has the complete and sole discretion to determine if a material, process, or article is substantially equal to or better than that specified and to approve or reject all substitution requests.

E. Substantiating data as described above shall include, at a minimum, the following information:

1. A signed affidavit from the Contractor stating that the material, process, or article proposed as a substitution is substantially equal to or better than that specified in every way except as may be listed on the affidavit.

2. Illustrations, specifications, catalog cut sheets, and any other relevant data required to prove that the material, process, or article is substantially equal to or better than that specified.

3. A statement of the cost implications of the substitution being requested, indicating whether and why the proposed substitution will reduce or increase the amount of the contract.

4. Information detailing the durability and lifecycle costs of the proposed substitution.

F. Failure to submit all the required substantiating data detailed above in a timely manner so that the substitution request can be adequately reviewed may result in rejection of the substitution request. The Engineer is not obligated to review multiple submittals related the same substitution request resulting from the Contractor’s failure to initially submit a complete package.

G. Time limitations within this Article shall be strictly complied with and in no case will an extension of time for completion of the contract be granted because of Contractor’s failure to provide substitution requests at the time and in the manner described herein.

H. The Contractor shall bear the costs of all City work associated with the review of substitution requests.

I. If substitution requests approved by the Engineer require that Contractor furnish materials, methods or services more expensive than that specified, the increased costs shall be borne by Contractor.

ARTICLE 15. SHOP DRAWINGS
A. Contractor shall check and verify all field measurements and shall submit with such promptness as to provide adequate time for review and cause no delay in its own Work or in that of any other contractor, subcontractor, or worker on the Project, six (6) copies of all shop drawings, calculations, schedules, and materials list, and all other provisions required by the Contract Documents. Contractor shall sign all submittals affirming that submittals have been reviewed and approved by Contractor prior to -62- GENERAL CONDITIONS
submission to Engineer. Each signed submittal shall affirm that the submittal meets all the requirements of the Contract Documents except as specifically and clearly noted and listed on the transmittal letter of the submittal.

B. Contractor shall make any corrections required by the Engineer, and file with the Engineer six (6) corrected copies each, and furnish such other copies as may be -63- GENERAL CONDITIONS
needed for completion of the Work. Engineer’s acceptance of shop drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called Engineer’s attention to such deviations at time of submission and has secured the Engineer’s written acceptance. Engineer’s acceptance of shop drawings shall not relieve Contractor from responsibility for errors in shop drawings.

ARTICLE 16. SUBMITTALS
A. Contractor shall furnish to the Engineer for approval, prior to purchasing or commencing any Work, a log of all samples, material lists and certifications, mix designs, schedules, and other submittals, as required in the Contract Documents. The log shall indicate whether samples will be provided in accordance with other provisions of this Contract.

B. Contractor will provide samples and submittals, together with catalogs and supporting data required by the Engineer, to the Engineer within a reasonable time period to provide for adequate review and avoid delays in the Work.

C. These requirements shall not authorize any extension of time for performance of this Contract. Engineer will check and approve such samples, but only for conformance with design concept of work and for compliance with information given in the Contract Documents. Work shall be in accordance with approved samples andsubmittals.

ARTICLE 17. MATERIALS
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities of every nature whatsoever necessary to execute and complete this Contract within specified time.

B. Unless otherwise specified, all materials shall be new and the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.

C. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work.

D. No materials, supplies, or equipment for Work under this Contract shall bepurchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier.

Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges.

E. Materials shall be stored on the Project site in such manner so as not to interfere with any operations of the City or any independent contractor. -64- GENERAL CONDITIONS
F. Contractor shall verify all measurements, dimensions, elevations, and quantities before ordering any materials or performing any Work, and the City shall not be liable for Contractor’s failure to so. No additional compensation, over and above payment for the actual quantities at the prices set out in the Bid Form, will be allowed because of differences between actual measurements, dimension, elevations and quantities and those indicated on the Plans and in the Specifications. Any difference therein shall be submitted to the Engineer for consideration before proceeding with the Work.

ARTICLE 18. PERMITS AND LICENSES
A. City will apply and pay for the review of necessary encroachment permits for Work within the public rights-of-way. Contractor shall obtain all other necessary permits and licenses for the construction of the Project, including encroachment permits, and shall pay all fees required by law and shall comply with all laws, ordinances, rules and regulations relating to the Work and to the preservation of public health and safety.

Before acceptance of the Project, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to the City.

B. The Bid Form contains an allowance for the Contractor’s cost of acquiring traffic control permits and for construction inspection fees that may be charged to the Contractor by the Agency of Jurisdiction. The allowance is included within the Bid Form to eliminate the need by bidders to research or estimate the costs of traffic control permits and construction inspection fees prior to submitting a bid. The allowance is specifically intended to account for the costs of traffic control permits and construction inspection fees charged by the local Agency of Jurisdiction only. No other costs payable by Contractor to the Agency of Jurisdiction are included within the allowance. Payment by City to Contractor under the Permit and Inspection Allowance Bid Item shall be made based on actual cost receipts only and in accordance with the provisions of these specifications.

ARTICLE 19. TRENCHES
A. Trenches Five Feet or More in Depth. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from hazards of caving ground during the excavation of any trench or trenches five feet or more in depth. If such plan varies from shoring system standards established by the Construction Safety Orders of the California Code of Regulations, Department of Industrial Relations, the plan shall be prepared by a California registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations. The Contractor shall designate in writing the “competent person” as defined in Title 8, California Code of Regulations, who shall be present at the Work Site each day that trenching/excavation is in progress. The “competent person” shall prepare and provide daily trenching/excavation inspection reports to the Engineer.

Contractor shall also submit a copy of its annual California Occupational Safety and Health Administration (Cal/OSHA) trench/excavation permit.

B. Excavations Deeper than Four Feet. If the Work involves excavating trenches or other excavations that extend deeper than four feet below the surface, Contractor shall -65- GENERAL CONDITIONS
promptly, and before the excavation is further disturbed, notify the City in writing of any of the following conditions:

1. Material that the Contractor believes may be material that is hazardous waste, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.

2. Subsurface or latent physical conditions at the site differing from thoseindicated.

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract
The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the Work, shall issue a change order under the procedures described in the Contract Documents.

In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.

ARTICLE 20. TRAFFIC CONTROL
A. Traffic control plan(s) for the Work may be required by the Agency(s) of Jurisdiction.

Traffic control plans, if required, shall be prepared at Contractor’s expense, and traffic control shall be performed at Contractor’s expense in accordance with the requirements of the Agency(s) of Jurisdiction. The Permit and Inspection Allowance included within the Bid Form includes the cost of required traffic control permit(s) and construction inspection by the Agency(s) of Jurisdiction only. The Permit and Inspection Allowance does not include costs for preparation of any required traffic control plans, implementation of any traffic control requirements or for any traffic signal services that may be required. Costs for traffic control plans, implementation of traffic control, or traffic signal services required by the Agency(s) of Jurisdiction shall be included in the Contractor’s Bid.

B. All warning signs and safety devices used by the Contractor to perform the Work shall conform to the requirements contained in the State of California, Department of Transportation’s current edition of “Manual of Traffic Controls for Construction and Maintenance Work Zones” or to the requirements of the local agency. The Contractor shall also be responsible for all traffic control required by the agency having jurisdiction over the project on the intersecting streets. Contractor must submit a traffic control plan to the agency having jurisdiction over the project for approval prior to starting work.
-66- GENERAL CONDITIONS
C. The Contractor’s representative on the site responsible for traffic control shall produce evidence that he/she has completed training acceptable to the California Department of Transportation for safety through construction zones. All of the streets in which the Work will occur shall remain open to traffic and one lane of traffic maintained at all times unless otherwise directed by the agency of jurisdiction. Businesses and residences adjacent to the Work shall be notified forty-eight (48) hours in advance of closing of driveways. The Contractor shall make every effort to minimize the amount of public parking temporarily eliminated due to construction in areas fronting businesses. No stockpiles of pipe or other material will be allowed in traveled right-ofways after working hours unless otherwise approved by theEngineer.

ARTICLE 21. DIVERSION OF RECYCLABLE WASTE MATERIALS
In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers as required for compliance with the local jurisdiction’s waste diversion ordinances. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests.

Contractor shall complete and execute any certification forms required by City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of theContractor.

ARTICLE 22. REMOVAL OF HAZARDOUS MATERIALS
Should Contractor encounter material reasonably believed to be polychlorinated biphenyl (PCB) or other toxic wastes and hazardous materials which have not been rendered harmless at the Project site, the Contractor shall immediately stop work at the affected Project site and shall report the condition to the City in writing. The City shall contract for any services required to directly remove and/or abate PCBs and other toxic wastes and hazardous materials, if required by the Project site(s), and shall not require the Contractor to subcontract for such services. The Work in the affected area shall not thereafter be resumed except by written agreement of the City and Contractor.

ARTICLE 23. SANITARY FACILITIES
Contractor shall provide sanitary temporary toilet buildings and hand washing facilities for the use of all workers. All toilets and hand washing facilities shall comply with all applicable federal, state and local laws, codes, ordinances, and regulations. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets and hand washing facilities shall be serviced no less than once weekly and shall be present in a quantity of not less than 1 per 20 workers as required by Cal/OSHA regulations. The toilets and hand washing facilities shall be maintained in a sanitary condition at all times. Use of toilet and hand washing facilities in the Work under construction shall not be permitted. Any other Sanitary Facilities required by Cal/OSHA shall be the responsibility of the Contractor.

ARTICLE 24. AIR POLLUTION CONTROL
Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes.

All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements. -67- GENERAL CONDITIONS
ARTICLE 25. LAYOUT AND FIELD ENGINEERING
All field engineering required for laying out the Work and establishing grades for earthwork operations shall be furnished by the Contractor at its expense.

ARTICLE 26. TESTS AND INSPECTIONS
A. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority requires any part of the Work to be tested or Approved, Contractor shall provide the Engineer at least two (2) working days’ notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection. Required certificates of inspection (or similar) shall be secured by Contractor. Costs for City testing and City inspection shall be paid by the City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.

B. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents.

C. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.

D. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into theWork.

E. If the manufacture of materials to be inspected or tested will occur in a plant or location greater than sixty (60) miles from the City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging.

F. Reexamination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.

ARTICLE 27. PROTECTION OF WORK AND PROPERTY
A. The Contractor shall be responsible for all damages to persons or property that occurs as a result of the Work. Contractor shall be responsible for the proper care and protection of all materials delivered and Work performed until completion and final Acceptance by the City. All Work shall be solely at the Contractor’s risk. Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes -68- GENERAL CONDITIONS
to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.

B. In an emergency affecting safety of life or of work or of adjoining property, Contractor, without special instruction or authorization from the Engineer, is hereby permitted to act to prevent such threatened loss or injury; and Contractor shall so act, without appeal, if so authorized or instructed by the Engineer or the City. Any compensation claimed by Contractor on account of emergency work shall be determined by and agreed upon by the City and the Contractor.

ARTICLE 28. CONTRACTOR’S MEANS AND METHODS
Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

ARTICLE 29. AUTHORIZED REPRESENTATIVES
The City shall designate representatives, who shall have the right to be present at the Project site at all times. The City may designate an inspector who shall have the right to observe all of the Contractor’s Work. The inspector shall not be responsible for the Contractor’s failure to carry out the Work in accordance with the Contract Documents. Contractor shall provide safe and proper facilities for such access.

ARTICLE 30. HOURS OF WORK
A. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall constitute a legal day’s work. The time of service of any worker employed at any time by the Contractor or by any subcontractor on any subcontract under this Contract upon the Work or upon any part of the Work contemplated by this Contract is limited and restricted to eight (8) hours during any one calendar day and 40 hours during any one calendar week, except as hereinafter provided. Notwithstanding the provisions herein above set forth, work performed by employees of Contractor in excess of eight (8) hours per day, and 40 hours during any one week, shall be permitted upon this public work upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one-half times the basic rate of pay.

B. The Contractor and every subcontractor shall keep an accurate record showing the name of and actual hours worked each calendar day and each calendar week by each worker employed in connection with the Work or any part of the Work contemplated by this Contract. The record shall be kept open at all reasonable hours to the inspection of the City and to the Division of Labor Law Enforcement, Department of Industrial Relations of the State of California.

C. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day and 40 hours in any one calendar -69- GENERAL CONDITIONS
week in violation of the provisions of Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.

D. Any work necessary to be performed after regular working hours, or on Saturdays and Sundays or other holidays, shall be performed without additional expense to theCity.

E. City will provide inspection during normal working hours from 7:00 a.m. to 3:00 p.m.

Monday through Friday. Inspection before or after this time will be charged to the Contractor as reimbursable inspection time. Inspections on weekends requires two days’ notice for review and approval. Upon written request and approval, the 8 hour working day may be changed to other limits subject to city/countyordinance.

F. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project site, other than between the hours of 9:00 p.m. to 5:00 a.m., Monday through Friday, with no Work allowed on the City-observed holidays, unless otherwise approved by the City:

1. Powered Vehicles

2. Construction Equipment

3. Loading and Unloading Vehicles

4. Domestic Power Tools
ARTICLE 31. PAYROLL RECORDS; LABOR COMPLIANCE
A. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall maintain weekly certified payroll records, showing the names, addresses, Social Security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by them in connection with the Work under this Contract.

Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require subcontractor(s) to certify weekly payroll records under penalty of perjury.

B. In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on the specified interval and format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

C. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City. Contractor -70- GENERAL CONDITIONS
shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

D. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide thefollowing:

1. A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.

2. A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the DIR.

E. Unless submitted electronically, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.

F. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency, the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor awarded the Contract or performing the contract shall not be marked or obliterated.

G. In the event of noncompliance with the requirements of this Article, the Contractor shall have ten (10) calendar days in which to comply subsequent to receipt of written notice specifying in what respects the Contractor must comply with this Article. Should noncompliance still be evident after such 10-day period, the Contractor shall pay a penalty of one hundred dollars ($100.00) to the City for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payment then due.

H. The responsibility for compliance with this Article shall rest upon theContractor.

ARTICLE 32. PREVAILING RATES OF WAGES
A. The Contractor is aware of the requirements of Labor Code sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws.

The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Contract from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of the prevailing rate of per diem wages which are on file at the City’s Administration Office and shall be made available to interested parties upon request. Contractor shall make copies of the prevailing rates -71- GENERAL CONDITIONS
of per diem wages for each craft, classification, or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at theProject site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing WageLaws.

B. The Contractor shall forfeit as a penalty to the City not more than Two Hundred Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the Department of Industrial Relations for such work or craft in which such worker is employed for any public work done under the Contract by it or by any subcontractor under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Contractor.

C. Contractor shall post, at appropriate conspicuous points on the Project site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.

ARTICLE 33. PUBLIC WORKS CONTRACTOR REGISTRATION
Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its subcontractorsmust be registered with the Department of Industrial Relations prior to the execution of a contract to perform public works. By entering into this Contract, Contractor represents that it is aware of the registration requirement and is currently registered with the DIR. Contractor shall maintain a current registration for the duration of the Project. Contractor shall further include the requirements of Labor Code sections 1725.5 and 1771.1 in any subcontract and ensure that all subcontractors are registered at the time this Contract is entered into and maintain registration for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

ARTICLE 34. EMPLOYMENT OF APPRENTICES
A. Contractor and all subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices.

B. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

C. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to exceed one hundred dollars ($100.00) for each calendar day of non-compliance pursuant to Labor Code section 1777.7.

D. The responsibility for compliance with this Article shall rest upon theContractor. -72- GENERAL CONDITIONS
ARTICLE 35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY Pursuant to Labor Code section 1735 and other applicable provisions of law, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law.

Employment Eligibility; Contractor. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time. Such requirements and restrictions include, but are not limited to, examination and retention of documentation confirming the identity and immigration status of each employee of the Contractor. Contractor also verifies that it has not committed a violation of any such law within the five (5) years immediately preceding the date of execution of this Contract, and shall not violate any such law at any time during the term of the Contract.

Contractor shall avoid any violation of any such law during the term of this Contract by participating in an electronic verification of work authorization program operated by the United States Department of Homeland Security, by participating in an equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, or by some other legally acceptable method. Contractor shall maintain records of each such verification, and shall make them available to the City or its representatives for inspection and copy at any time during normal business hours. The Cityshall not be responsible for any costs or expenses related to Contractor’s compliance with the requirements provided for or referred to herein.

Employment Eligibility; Subcontractors, Sub-subcontractors and Consultants. To the same extent and under the same conditions as Contractor, Contractor shall require all of its subcontractors, sub-subcontractors and consultants performing any part of the Work or of this Contract to make the same verifications and comply with all requirements and restrictions provided for herein.

Employment Eligibility; Failure to Comply. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor, and understands that any of the following shall be grounds for the City to terminate the Contract for cause: (1) failure of Contractor or its subcontractors, sub-subcontractors or consultants to meet any of the requirements provided for herein; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.

ARTICLE 36. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS Contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contractor on the -73- GENERAL CONDITIONS
project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on theproject.

ARTICLE 37. LABOR/EMPLOYMENT SAFETY
The Contractor shall comply with all applicable laws and regulations of the federal, state, and local government, including Cal/OSHA requirements and requirements for verification of employees’ legal right to work in the United States.

The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the availability of emergency medical services for its employees in accordance with California Code of Regulations, Title 8, Section1512.

The Contractor shall submit the Illness and Injury Prevention Program and a Project site specific safety program to the City prior to beginning Work at the Project site. Contractor shall maintain a confined space program that meets or exceeds the City Standards. Contractor shall adhere to the City’s lock out tag out program.

ARTICLE 38. INSURANCE
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain all of the insurance described in this Article. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required hereunder. Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this Article. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall furnish City with original certificates of insurance and endorsements effective coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms acceptable to the City. All certificates and endorsements must be received and approved by the City before Work commences.

A. Additional Insureds; Waiver of Subrogation. The City, its officials, officers, employees, agents and authorized volunteers shall be named as Additional Insureds on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies of Commercial General Liability and Automobile Liability insurance using, for Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20 10 and 20 37 (or endorsements providing the exact same coverage, including completed operations), and, for subcontractors’ policies of Commercial General Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same coverage). Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, all available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as Additional Insureds hereunder. Contractor and its insurance carriers shall provide a Waiver of Subrogation in favor of those parties.

B. Workers’ Compensation Insurance. The Contractor shall provide workers’ compensation insurance for all of the employees engaged in Work under this Contract, -74- GENERAL CONDITIONS
on or at the Site, and, in case of any sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. Any class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of section 3700 of the Labor Code. The Contractor shall file with the City certificates of his insurance protecting workers. Company or companies providing insurance coverage shallbe acceptable to the City, if in the form and coverage as set forth in the Contract Documents.

C. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability Insurance, including Occupational Disease, in the amount of at least one million dollars ($1,000,000.00) per person per accident. Contractor shall provide City with a certificate of Employer’s Liability Insurance. Such insurance shall comply with the provisions of the Contract Documents. The policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the City.

D. Commercial General Liability Insurance. Contractor shall provide “occurrence” form Commercial General Liability insurance coverage at least as broad as the most current ISO CGL Form 00 01, including but not limited to, premises liability, contractual liability, products/completed operations, personal and advertising injury which may arise from or out of Contractor’s operations, use, and management of the Site, or the performance of its obligations hereunder. The policy shall not contain any exclusion contrary to this Contract including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured against another. Policy limits shall not be less than $1,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Defense costs shall be paid in addition to thelimits.

1. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to the City, and shall not preclude the City from taking such other actions available to the City under other provisions of the Contract Documents orlaw.

2. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.

3. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non-owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, -75- GENERAL CONDITIONS
under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions relating to liability for injury to or death of persons and damage to property.

4. If the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, the City may require additional coverage to be purchased by Contractor to restore the required limits. Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.

5. All policies of general liability insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

E. Automobile Liability Insurance. Contractor shall provide “occurrence” form Automobile Liability Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least, one million dollars ($1,000,000) per accident for bodily injury and property damage. Such insurance shall provide coverage with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible, in a form and with insurance companies acceptable to the City. All policies of automobile insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

F. Builder’s Risk [“All Risk”]

1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s Risk [“All Risk”] extended coverage insurance on all work, material, equipment, appliances, tools, and structures that are or will become part of the Work and subject to loss or damage by fire, and vandalism and malicious mischief, in an amount to cover 100% of the replacement cost. The City accepts no responsibility for the Work until the Work is formally accepted by the City. The Contractor shall provide a certificate evidencing this coverage before commencing performanceof the Work.

2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding those solely responsible for design work), suppliers, and City, its elected officials, officers, employees, agents and authorized volunteers, as their interests may appear. Contractor shall not be required to maintain property insurance for any portion of the Work following acceptance by City.

3. Policy shall be provided for replacement value on an “all risk” basis. There shall be no coinsurance penalty provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery -76- GENERAL CONDITIONS
accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) transit coverage, including ocean marine coverage (unless insured by the supplier), with sub-limits sufficient to insure the full replacement value of any key equipment item; and (5) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site. Such insurance shall be on a form acceptable to City to ensure adequacy and sublimit.

4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit. c. Coverage shall include Contractor’s tools and equipment. d. Insurance shall include boiler, machinery and material hoist coverage.

G. [***FOR WORK INVOLVING ENVIRONMENTAL HAZARDS***] Contractor’s Pollution Liability Coverage. Contractor shall provide pollution liability insurance in an amount not less than $1,000,000 per occurrence and $2,000,000aggregate.

H. Contractor shall require all tiers of sub-contractors working under this Contract to provide the insurance required under this Article unless otherwise agreed to in writing by City. Contractor shall make certain that any and all subcontractors hired by Contractor are insured in accordance with this Contract. If any subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold the City harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.

ARTICLE 39. FORM AND PROOF OF CARRIAGE OF INSURANCE
A. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall have an A.M.

Best rating of not less than an A:VII. Insurance deductibles or self-insured retentions must be declared by the Contractor. At the election of the City the Contractor shall either 1) reduce or eliminate such deductibles or self-insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. If umbrella or excess liability coverage is used to meet any required limit(s) specified herein, the Contractor shall provide a “follow form” endorsement satisfactory to the City indicating that such coverage is subject to the same terms and conditions as the underlying liability policy.

B. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or cancelled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, -77- GENERAL CONDITIONS
including breaches of warranties, shall not affect coverage provided to the City, its officials, officers, agents, employees, and volunteers.

C. The Certificates(s) and policies of insurance shall contain or shall be endorsed to contain the covenant of the insurance carrier(s) that it shall provide no less thanthirty (30) days written notice be given to the City prior to any material modification or cancellation of such insurance. In the event of a material modification or cancellation of coverage, the City may terminate the Contract or stop theWork in accordance with the Contract Documents, unless the City receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverage’s set forth herein and the insurance required herein is in full force and effect. Contractor shall not take possession, or use the Site, or commence operations under this Contract until the City has been furnished original Certificate(s) of Insurance and certified original copies of endorsements or policies of insurance including all endorsements and any and all other attachments as required in this Article. The original endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf.

D. The Certificate(s) of Insurance, policies and endorsements shall so covenant and shall be construed as primary, and the City’s insurance and/or deductibles and/or selfinsured retentions or self-insured programs shall not be construed ascontributory.

E. City reserves the right to adjust the monetary limits of insurance coverages during the term of this Contract including any extension thereof if, in the City’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate.

F. Contractor shall report to the City, in addition to the Contractor’s insurer, any and all insurance claims submitted by the Contractor in connection with the Work under this Contract.

ARTICLE 40. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
A. Time for Completion/Liquidated Damages. Time is of the essence in the completion of the Work. Work shall be commenced within ten (10) Days of the date stated in the City’s Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date.

Furthermore, Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date. If the Work is not completed as stated in the Contract Documents, it is understood that the City will suffer damage. In accordance with Government Code section 53069.85, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each calendar day of delay until the Work is fully completed. Contractor and its surety shall be liable for any liquidated -78- GENERAL CONDITIONS
damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.

B. Inclement Weather. Contractor shall abide by the Engineer’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule.

C. Extension of Time. Contractor shall not be charged liquidated damages because of any delays in completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its subcontractors or suppliers).

Contractor shall within five (5) Days of identifying any such delay notify the City in writing of causes of delay. The City shall ascertain the facts and extent of delay and grant extension of time for completing the Work when, in its judgment, the facts justify such an extension. Time extensions to the Project shall be requested by the Contractor as they occur and without delay. No delay claims shall be permitted unless the event or occurrence delays the completion of the Project beyond the Contract completion date.

D. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay, including delays caused by items that are the responsibility of the City pursuant to Government Code section 4215, shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.

ARTICLE 41. COST BREAKDOWN AND PERIODIC ESTIMATES
Contractor shall furnish on forms Approved by the City:

A. Within ten (10) Days of Notice to Proceed with the Contract, a detailed estimate giving a complete breakdown of the Contract price, if the Contract amount is a lumpsum.

B. A monthly itemized estimate of Work done for the purpose of making progress payments. In order for the City to consider and evaluate each progress payment application, the Contractor shall submit a detailed measurement of Work performed and a progress estimate of the value thereof before the tenth (10th) Day of the following month.

C. Contractor shall submit, with each of its payment requests, an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the BidForm.

D. Following the City’s Acceptance of the Work, the Contractor shall submit to the City a written statement of the final quantities of unit price items for inclusion in the final payment request.

E. The City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.
-79- GENERAL CONDITIONS
Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.

ARTICLE 42. PROGRESS ESTIMATES AND PAYMENT
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to Engineer a payment request which shall set forth in detail the value of the Work done for the period beginning with the date work was first commenced and ending on the end of the calendar month for which the payment request is prepared. Contractor shall include any amount earned for authorized extra work. From the total thus computed, a deduction shall be made in the amount of five percent (5%) for retention, except where the City has adopted a finding that the Work done under the Contract is substantially complex, and then the amount withheld as retention shall be the percentage specified in the Notice Inviting Bids. From the remainder a further deduction may be made in accordance with Section B below. The amount computed, less the amount withheld for retention and any amounts withheld as set forth below, shall be the amount of the Contractor’s payment request.

B. The City may withhold a sufficient amount or amounts of any payment or payments otherwise due to Contractor, as in his judgment may be necessary tocover:

1. Payments which may be past due and payable for just claims against Contractor or any subcontractors for labor or materials furnished in and about the performance of work on the Project under this Contract.

2. Defective work not remedied.

3. Failure of Contractor to make proper payments to his subcontractor or for material or labor.

4. Completion of the Contract if there is a reasonable doubt that the Work can be completed for balance then unpaid.

5. Damage to another contractor or a third party.

6. Amounts which may be due the City for claims against Contractor.

7. Failure of Contractor to keep the record (“as-built”) drawings up to date.

8. Failure to provide update on construction schedule as requiredherein.

9. Site cleanup.

10. Failure to comply with Contract Documents.

11. Liquidated damages.

12. Legally permitted penalties.

C. The City may apply such withheld amount or amounts to payment of such claims or obligations at its discretion with the exception of subsections (B)(1), (3), and (5) of this -80- GENERAL CONDITIONS
Article, which must be retained or applied in accordance with applicable law. In so doing, the City shall be deemed the agent of Contractor and any payment so made by the City shall be considered as a payment made under contract by the City to Contractor and the City shall not be liable to Contractor for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. The City will render Contractor a proper accounting of such funds disbursed on behalf of Contractor.

D. Upon receipt, the Engineer shall review the payment request to determine whether it is undisputed and suitable for payment. If the payment request is determined to be unsuitable for payment, it shall be returned to Contractor as soon as practicable but not later than seven (7) Days after receipt, accompanied by a document setting forth in writing the reasons why the payment request is not proper. The City shall make the progress payment within 30 calendar days after the receipt of an undisputed and properly submitted payment request from Contractor, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code section 8132.

The number of days available to the City to make a payment without incurring interest pursuant to this paragraph shall be reduced by the number of days by which the Engineer exceeds the seven (7) Day requirement.

E. A payment request shall be considered properly executed if funds are available for payment of the payment request and payment is not delayed due to an audit inquiry by the financial officer of the City.

ARTICLE 43. SECURITIES FOR MONEY WITHHELD
Pursuant to section 22300 of the Public Contract Code of the State of California, Contractor may request the City to make retention payments directly to an escrow agent or may substitute securities for any money withheld by the City to ensure performance under the contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a state or federally chartered bank as the escrow agent who shall return such securities to Contractor upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in section 22300 of the Public Contract Code.

ARTICLE 44. CHANGES AND EXTRA WORK.

A. Contract Change Orders.

1. The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and the Contract Price and Contract Time shall be adjusted accordingly. Except as otherwise provided herein, all such changes in the Work shall be authorized by Change Order, and shall be performed under the applicable conditions of the Contract Documents. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in the Contract Price or the Contract Time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.

2. Contractor shall promptly execute changes in the Work as directed in writing by the City even when the parties have not reached agreement on whether the -81- GENERAL CONDITIONS
change increases the scope of Work or affects the Contract Price or Contract Time.

All claims for additional compensation to the Contractor shall be presented in writing. No claim will be considered after the Work in question has been done unless a written Change Order has been issued or a timely written notice of claim has been made by Contractor.

3. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions, and provisions of the originalContract.

4. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done.

5. No dispute, disagreement, or failure of the parties to reach agreement on the terms of the Change Order shall relieve the Contractor from the obligation to proceed with performance of the work, including Additional Work, promptly and expeditiously.

6. Contractor shall make available to the City any of the Contractor’s documents related to the Project immediately upon request of the City, as set forth in Article

52. 7. Any alterations, extensions of time, Additional Work, or any other changes may be made without securing consent of the Contractor’s surety or sureties.

B. Contract Price Change.

1. Process for Determining Adjustments in ContractPrice. a. Owner Initiated Change. The Contractor must submit a complete cost proposal, including any change in the Contract Price or Contract Time, within seven (7) Days after receipt of a scope of a proposed change order initiated by the City, unless the City requests that proposals be submitted in less than seven (7) Days.
b. Contractor Initiated Change. The Contractor must give written notice of a proposed change order required for compliance with the Contract Documents within seven (7) Days of discovery of the facts giving rise to the proposed change order.
c. Whenever possible, any changes to the Contract amount shall be in a lump sum mutually agreed to by the Contractor and the City.
d. Price quotations from the Contractor shall be accompanied by sufficiently detailed supporting documentation to permit verification by the City, including but not limited to estimates and quotations from subcontractors or material suppliers, as the City may reasonably request. Contractor shall certify the accuracy of all Change Order Requests under penalty of perjury. -82- GENERAL CONDITIONS
e. If the Contractor fails to submit a complete cost proposal within the seven (7) Day period (or as requested), the City has the right to order the Contractor in writing to commence the Work immediately on a time and materials basis and/or issue a lump sum change to the Contract Price and/or Contract Time in accordance with the City’s estimate. If the change is issued based on the City's estimate, the Contractor will waive its right to dispute the action unless within fifteen (15) Days following completion of the added/deleted work, the Contractor presents written proof that the City’s estimate was in error.

2. Unit Price Change Orders.
a. When the actual quantity of a Unit Price item varies from the Bid Form, compensation for the change in quantity will be calculated by multiplying the actual quantity by the Unit Price. This calculation may result in either an additive or deductive Final Change Order pursuant to the Contract Documents. b. No Mark up for Overhead and Profit. Because the Contract Unit Prices provided in the Bid Form include Overhead and Profit as determined by Contractor at the time of Bid submission, no mark up or deduction for Overhead and Profit will be included in Unit Price ChangeOrders. c. Bid items included on the Bid Form may be deducted from the Work in their entirety without any negotiated extra costs.
d. Contractor acknowledges that unit quantities are estimates and agrees that the estimated unit quantities listed on the Bid Form will be adjusted to reflect the actual unit quantities which may result in an adjustment to the Contract Unit Prices. Such an adjustment will be made by execution of a final additive or deductive Change Order following Contractor’s completion of the Work. Upon notification, Contractor’s failure to respond within seven (7) Days will result in City’s issuance of a unit quantity adjustment to the Contract Unit Prices and/or Contract Time in accordance with the Contract Documents. e. The City or Contractor may make a Claim for an adjustment in the Unit Price in accordance with the Contract Documents if:
i. the quantity of any item of Unit Price Work performed by Contractordiffers by twenty-five percent (25%) or more from the estimated quantity of such item indicated in the Contract; and
ii. there is no corresponding adjustment with respect to any other item of Work; and
iii. Contractor believes that Contractor is entitled to an increase in Unit Price as a result of having incurred additional expense or the City believes that the City is entitled to a decrease in Unit Price and the parties are unable to agree as to the amount of any such increase or decrease.

3. Lump Sum Change Orders. Compensation for Lump Sum Change Orders shall be limited to expenditures necessitated specifically by the Additional Work, and shall be segregated as follows:
-83- GENERAL CONDITIONS
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the Additional Work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from Federal, State or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the Additional Work cost will not be permitted unless the Contractor establishes the necessity for such new classifications. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipmentrental.
b. Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight, and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice. If invoices or other satisfactory evidenceof cost are not furnished within fifteen (15) Days of delivery, then the City shall determine the materials cost, at its sole discretion.
c. Tool and Equipment Use. Costs for the use of small tools, which are toolsthat have a replacement value of $1,000 or less, shall be considered included in the Overhead and Profit mark-ups established below. Regardless of ownership, the rates to be used in determining equipment use costs shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the Work is performed.

4. Time and Materials Change Orders.
a. General. The term Time and Materials means the sum of all costs reasonably and necessarily incurred and paid by Contractor for labor, materials, and equipment in the proper performance of Additional Work. Except as otherwise may be agreed to in writing by the City, such costs shall be in amounts no higher than those prevailing in the locality of the Project, and shall include only the following items.
b. Timely and Final Documentation.
i. T&M Daily Sheets. Contractor must submit timesheets, materialsinvoices, records of equipment hours, and records of rental equipment hours to the City’s Representative for an approval signature each day Additional Work is performed. Failure to get the City’s Representative’s approval signature each Day shall result in a waiver of Contractor’s right to claim these costs.

The City’s Representative’s signature on time sheets only serves as verification that the Work was performed and is not indicative of City’s agreement to Contractor’s entitlement to the cost.
ii. T&M Daily Summary Sheets. All documentation of incurred costs (“T&M Daily Summary Sheets”) shall be submitted by Contractor within three (3) Days of incurring the cost for labor, material, equipment, and special services as Additional Work is performed. Contractor’s actual costs shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and special services. Each T&M Daily Summary -84- GENERAL CONDITIONS
Sheet shall include Contractor’s actual costs incurred for the Additional Work performed that day and a cumulative total of Contractor’s actual costs incurred for the Additional Work. Contractor’s failure to provide a T&M Daily Summary Sheet showing a total cost summary within three (3) Days but within five (5) Days of performance of the Work will result in the Contractor’s otherwise allowable overhead and profit being reduced by 50% for that portion of Additional Work which was not documented in a timely manner.

Contractor’s failure to submit the T&M Daily Summary Sheet within five (5) Days of performance of the Work will result in a total waiver of Contractor’s right to claim these costs.
iii. T&M Total Cost Summary Sheet. Contractor shall submit a T&M Total Cost Summary Sheet, which shall include total actual costs, within seven (7) Days following completion of City approved Additional Work. Contractor’s total actual cost shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and special services.

Contractor’s failure to submit the T&M Total Cost Summary Sheet within seven (7) Days of completion of the Additional Work will result in Contractor’s waiver for any reimbursement of any costs associated with the T&M Summary Sheets or the performance of the Additional Work. c. Labor. The Contractor will be paid the cost of labor for the workers used in the actual and direct performance of the Work. The cost of labor will be the sum of the actual wages paid (which shall include any employer payments to or on behalf of the workers for health and welfare, pension, vacation, and similar purposes) substantiated by timesheets and certified payroll for wages prevailing for each craft or type of workers performing the Additional Work at the time the Additional Work is done, and the labor surcharge set forth in the Department of Transportation publication entitled Labor Surcharge and Equipment Rental Rates, which is in effect on the date upon which the Work is accomplished and which is a part of the Contract. The labor surcharge shall constitute full compensation for all payments imposed by Federal, State, or local laws and for all other payments made to, or on behalf of, the workers, other than actual wages.
i. Equipment Operator Exception. Labor costs for equipment operators and helpers shall be paid only when such costs are not included in the invoice for equipment rental.
ii. Foreman Exception. The labor costs for foremen shall be proportioned to all of their assigned work and only that applicable to the Additional Work shall be paid. Indirect labor costs, including, without limitation, the superintendent, project manager, and other labor identified in theContract Documents will be considered Overhead.
d. Materials. The cost of materials reported shall be itemized at invoiceor lowest current price at which materials are locally available and delivered to the Project site in the quantities involved, plus the cost of sales tax, freight, delivery, and storage.
-85- GENERAL CONDITIONS
i. Trade discounts available to the purchaser shall be credited to the City notwithstanding the fact that such discounts may not have been taken by Contractor.
ii. For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual supplier as determined by the City’s Representative.
iii. Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on Additional Work items or the current wholesale price for such materials delivered to the Project site, whichever price is lower.
iv. If, in the opinion of the City’s Representative, the cost of materials is excessive, or Contractor does not furnish satisfactory evidence of the cost of such materials, then the cost shall be deemed to be the lowest current wholesale price for the total quantity concerned delivered to the Project site less trade discounts.
v. The City reserves the right to furnish materials for the Additional Work and no Claim shall be allowed by Contractor for costs of such materials or Indirect Costs or profit on City furnished materials.
e. Equipment.
i. Rental Time. The rental time to be paid for equipment on the Project site shall be the time the equipment is in productive operation on the Additional Work being performed and, in addition, shall include the time required to move the equipment to the location of the Additional Work and return it to the original location or to another location requiring no more time thanthat required to return it to its original location; except that moving time will not be paid if the equipment is used on other than the Additional Work, even though located at the site of the Additional Work.
(a) Rental Time Not Allowed. Rental time will not be allowed while equipment is inoperative due to breakdowns.
(b) Computation Method. The following shall be used in computing the rental time of equipment on the Project site.
(i) When hourly rates are paid, any part of an hour less than 30 minutes of operation shall be considered to be 1/2-hour of operation, and any part of an hour in excess of 30 minutes will be considered one hour of operation.
(ii) When daily rates are paid, any part of a day less than 4 hours operation shall be considered to be 1/2-day of operation, and any part of an hour in excess of 4 hours will be considered one day of operation.
-86- GENERAL CONDITIONS
ii. Rental Rates. Contractor will be paid for the use of equipment at the lesser of (i) the actual rental rate, or (ii) the rental rate listed for that equipment in the California Department of Transportation publication entitled Labor Surcharge and Equipment Rental Rates, which is in effect on the date upon which the Contract was executed. Such rental rates will be used to compute payments for equipment whether the equipment is under Contractor’s control through direct ownership, leasing, renting, or another method of acquisition. The rental rate to be applied for use of each item of equipment shall be the rate (i.e., daily, monthly) resulting in the least total cost to the City for the total period of use. If it is deemed necessary by Contractor to use equipment not listed in the publication, an equitable rental rate for the equipment will be established by the City’s Representative. Contractor may furnish cost data which might assist the City’s Representative in the establishment of the rentalrate.
iii. Contractor-Owned Equipment.
(a) For Contractor-owned equipment, the allowed equipment rental rate will be limited to the monthly equipment rental rate using a utilization rate of 173 hours per month.
(b) For Contractor-owned equipment, the rental time to be paid for equipment on the Site shall be the time the equipment is in productive operation, unless, in the instance of standby time, the equipment could be actively used by Contractor on another project, then City shall pay for the entirety of the time the equipment is on Site. It shall be Contractor’s burden to demonstrate to the City that the equipment could be actively used on another project.
iv. All equipment shall, in the opinion of the City’s Representative, be in good working condition and suitable for the purpose for which the equipment is to be used.
v. Before construction equipment is used on the Additional Work, Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the City’s Representative, in duplicate, a description of the equipment and its identifying number and the scheduled Additional Work activities planned.
vi. Unless otherwise specified, manufacturer’s rating and manufacturer approved modifications shall be used to classify equipment for the determination of applicable rental rates. Equipment which has no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer.
f. Special Services. Special work or services are defined as that Additional Work characterized by extraordinary complexity, sophistication, or innovation or a combination of the foregoing attributes which are unique to the construction industry.
-87- GENERAL CONDITIONS
i. Invoices for Special Services. When the City’s Representative and Contractor determine that a special service is required which cannot be performed by the forces of Contractor or those of any of its Subcontractors, the special service may be performed by an entity especially skilled in the Additional Work. Invoices for special services based upon the current fair market value thereof may be accepted without complete itemization of labor, material, and equipment rental costs, after validation of market values by the City’s Representative.
ii. Discount and Allowance. All invoices for special services will be adjusted by deducting all trade discounts offered or available, whether the discounts were taken or not. In lieu of Overhead and Profit specified herein, a total allowance not to exceed fifteen percent (15%) for Overhead and Profit will be added to invoices for Special Services.
iii. When the City determines, in its sole discretion, that competitive bidding is necessary for certain special services, Contractor shall solicit competitive bids for those special services.
g. Excluded Costs. The term Time and Material shall not include any of the following costs or any other home or field office overhead costs, all of which are to be considered administrative costs covered by Contractor’s allowance for Overhead and Profit.
i. Overhead Cost. Payroll costs and other compensation of Contractor’s officers, executives, principals, general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks, and other personnel employed by Contractor whether at the Site or in Contractor’s principal office or any branch office, material yard, or shop for general administration of the AdditionalWork; ii. Office Expenses. Expenses of Contractor’s principal and branchoffices; iii. Capital Expenses. Any part of Contractor’s capital expenses, including interest on Contractor’s capital employed for the Additional Work and charges against Contractor for delinquent payments;
iv. Negligence. Costs due to the negligence of Contractor or any Subcontractor or Supplier, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including without limitation the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage toproperty; v. Other. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in the Contract Documents;
vi. Small Tools. Cost of small tools valued at less than $1,000 and that remain the property of Contractor;
-88- GENERAL CONDITIONS
vii. Administrative Costs. Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estimates, or the preparation or filing of Claims;
viii. Anticipated Lost Profits. Expenses of Contractor associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings, or unpaid retention;
ix. Home Office Overhead. Costs derived from the computation of a “home office overhead” rate by application of the Eichleay, Allegheny, burden fluctuation, or other similar methods;
x. Special Consultants and Attorneys. Costs of special consultants or attorneys, whether or not in the direct employ of Contractor, employed for services specifically related to the resolution of a Claim, dispute, or other matter arising out of or relating to the performance of the AdditionalWork. h. Overhead, Profit and Other Charges. The mark-up for overhead (including supervision) and profit on work added to the Contract shall be according to the following:
i. “Net Cost” is defined as consisting of costs of labor, materials, and tools and equipment only excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and subcontractors at cost only, without mark-up. Contractor shall provide City with documentation of the costs, including, but not limited to, payroll records, invoices, and such other information as City may reasonably request.
ii. For Work performed by the Contractor’s forces, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Net Cost of the Work.
iii. For Work performed by a subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the subcontractor’s Net Cost of the Work to which the Contractor may add five percent (5%) of the subcontractor’s Net Cost.
iv. For Work performed by a sub-subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the sub-subcontractor’s Net Cost for Work to which the subcontractor and general contractor may each add an additional five percent (5%) of the Net Cost of the lower tier subcontractor.
v. No additional mark-up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by City exceed twenty-five percent (25%) of the Net Cost as defined herein, of the party that performs the Work.

5. All of the following costs are included in the markups for overhead and profit described above, and Contractor shall not receive any additional compensation -89- GENERAL CONDITIONS
for: Submittals, drawings, field drawings, Shop Drawings, including submissions of drawings; field inspection; General Superintendence; General administration and preparation of cost proposals, schedule analysis, Change Orders, and other supporting documentation; computer services; reproduction services; Salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; Janitorial services; Small tools, incidentals and consumables; Temporary On-Site facilities (Offices, Telephones, High Speed Internet Access, Plumbing, Electrical Power, Lighting; Platforms, Fencing, Water), Jobsite and Home office overhead or other expenses; vehicles and fuel used for work otherwise included in the Contract Documents; Surveying; Estimating; Protection of Work; Handling and disposal fees; Final Cleanup; Other Incidental Work; Related Warranties; insurance and bond premiums.

6. For added or deducted Work by subcontractors, the Contractor shall furnish to the City the subcontractor’s signed detailed record of the cost of labor, material and equipment, including the subcontractor markup for overhead and profit. The same requirement shall apply to sub-subcontractors

7. For added or deducted work furnished by a vendor or supplier, the Contractor shall furnish to the City a detailed record of the cost to the Contractor, signed by such vendor or supplier.

8. Any change in the Work involving both additions and deletions shall indicate a net total cost, including subcontracts and materials. Allowance for overhead and profit, as specified herein, shall be applied if the net total cost is an increase in the Contract Price; overhead and profit allowances shall not be applied if the net total cost is a deduction to the Contract Price. The estimated cost of deductions shall be based on labor and material prices on the date the Contract wasexecuted.

9. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order for Work. No claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s change order form in an attempt to reserve additionalrights.

10. If the City disagrees with the proposal submitted by Contractor, it will notify the Contractor and the City will provide its opinion of the appropriate price and/or time extension. If the Contractor agrees with the City, a Change Order will be issued by the City. If no agreement can be reached, the City shall have the right to issue a unilateral Change Order setting forth its determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. Such determination shall become final and binding if the Contractor fails to submit a claim in writing to the City within fifteen (15) Days of the issuance of the unilateral Change Order, disputing the terms of the unilateral Change Order, and providing such supporting documentation for its position as the City may require.

C. Change of Contract Times.

1. The Contract Times may only be changed by a Change Order. -90- GENERAL CONDITIONS

2. All changes in the Contract Price and/or adjustments to the Contract Times related to each change shall be included in Contractor’s COR pursuant to this Article. No cost or time will be allowed for cumulative effects of multiple changes. All Change Orders must state that the Contract Time is not changed or is either increased or decreased by a specific number of days. Failure to include a change to time shall waive any change to the time unless the parties mutually agree in writing to postpone a determination of the change to time resulting from the ChangeOrder.

3. Notice of the amount of the request for adjustment in the Contract Times with supporting data shall be delivered within seven (7) Days after such start of occurrence, unless City’s Representative allows an additional period of time to ascertain more accurate data in support of the request. No extension of time or additional compensation shall be given for a delay if the Contractor failed to give notice in the manner and within the time prescribed.

4. City may elect, at City’s sole discretion, to grant an extension in Contract Times, without Contractor’s request, because of delays or otherfactors.

5. Use of Float and Critical Path.
a. Float is for the benefit of the Project. Float shall not be considered for the exclusive use or benefit of either the City or the Contractor. b. Contractor shall not be entitled to compensation, and City will not compensate Contractor, for delays which impact early completion. Any difference in time between the Contractor’s early completion and the Contract Time shall be considered a part of the Project float.

6. Contractor’s entitlement to an extension of the Contract Times is limited to a Citycaused extension of the critical path, reduced by the Contractor’s concurrent delays, and established by a proper time impact analysis. No time extension shall be allowed unless, and then only to the extent that, the City-caused delay extends the critical path beyond the previously approved Contract Time. If approved, the increase in time required to complete the Work shall be added to the Contract Time.
a. Contractor shall not be entitled to an adjustment in the Contract Price or Contract Times for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor.
b. If Contractor is delayed in the performance or progress of the Work by fire, flood, epidemic, abnormal weather conditions (as determined by the City), Acts of God, acts or failures to act of utility owners not under the control of City, or other causes not the fault of and beyond control of City and Contractor, then Contractor shall be entitled to a time extension when the Work stopped is on the critical path. Such a non-compensable adjustment shall be Contractor’s sole and exclusive remedy for such delays. Contractor must submit a timely request in accordance with the requirements of this Article. c. Utility-Related Delays.
-91- GENERAL CONDITIONS
i. Contractor shall immediately notify in writing the utility owner and City’s Representative of its construction schedule and any subsequent changes in the construction schedule which will affect the time available for protection, removal, or relocation of utilities. Requests for extensions of time arising out of utility relocation or repair delays shall be filed in accordance with this Article.
ii. Contractor shall not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, as noted in the Contract Documents or by the Underground Service Alert survey.

7. Content for Requests for Contract Extension. Contractor’s justification for entitlement shall be clear and complete citing specific Contract Document references and reasons on which Contractor’s entitlement is based. At a minimum, each request for a time extension must include:
a. Each request for an extension of Contract Time must identify the impacting event, in narrative form, providing a description of the delay event and sufficient justification as to why the Contractor is entitled to a time extension. Contractor must demonstrate that the delay arises from unforeseeable causes beyond the control and without the fault or negligence of both Contractor and any Subcontractors or Suppliers, or any other persons or organizations employed by any of them or for whose acts any of them may be liable, and that such causes in fact lead to performance or completion of the Work, or specified part in question, beyond the corresponding Contract Times, despite Contractor’s reasonable and diligent actions to guard against those effects. b. Each request for an extension of Contract Time must include a time impact analysis in CPM format, using the Contemporaneous Impacted As-Planned Schedule Analysis to calculate the impact of the delay event.

8. No Damages for Reasonable Delay.
a. City’s liability to Contractor for delays for which City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. b. Damages caused by unreasonable City delay that impact the critical path, including delays caused by items that are the responsibility of the City pursuant to Government Code section 4215, shall be compensated at the Daily Rate established in the Special Conditions. No other calculations, proportions or formulas shall be used to calculate any delay damages.
c. City and City’s Representative, and the officers, members, partners, employees, agents, consultants, or subcontractors of each of them, shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) -92- GENERAL CONDITIONS
sustained by Contractor on or in connection with any other project or anticipated project.

9. Contractor’s failure, neglect, or refusal to comply with the requirements of the Contract Documents, or any portion thereof, shall bar Contractor’s request for extensions of the Contract Times. Such failure, neglect, or refusal prejudices City’s and City’s Representative’s ability to recognize and mitigate delay, and such failure, neglect, or refusal prevent the timely analysis of requests for extensions of Contract Times, and whether such extensions may be warranted. Contractor hereby waives all rights to extensions of Contract Times due to delays or accelerations that result from or occur during periods of time for which Contractor fails, neglects, or refuses to fully comply with the requirements of thisArticle.

ARTICLE 45. FINAL ACCEPTANCE AND PAYMENT
A. The acceptance of the Work on behalf of the City will be made by the Engineer. Such acceptance by the City shall not constitute a waiver of defects. When the Work has been accepted there shall be paid to Contractor a sum equal to the contract price less any amounts previously paid Contractor and less any amounts withheld by the City from Contractor under the terms of the contract. The final five percent (5%), or the percentage specified in the notice inviting bids where the City has adopted a finding of substantially complete, shall not become due and payable until five (5) calendar days shall have elapsed after the expiration of the period within which all claims may be filed under the provisions of Civil Code section 9356. If the Contractor has placed securities with the City as described herein, the Contractor shall be paid a sum equal to one hundred percent (100%) of the contract price less any amounts due the City under the terms of the Contract.

B. Unless Contractor advises the City in writing prior to acceptance of the final five percent (5%) or the percentage specified in the notice inviting bids where the City has adopted a finding of substantially complete, or the return of securities held as described herein, said acceptance shall operate as a release to the City of all claims and all liability to Contractor for all things done or furnished in connection with this work and for every act of negligence of the City and for all other claims relating to or arising out of this work. If Contractor advises the City in writing prior to acceptance of final payment or return of the securities that there is a dispute regarding the amount due the Contractor, the City may pay the undisputed amount contingent upon the Contractor furnishing a release of all undisputed claims against the City with the disputed claims in stated amounts being specifically excluded by Contractor from the operation of the release. No payments, however, final or otherwise, shall operate to release Contractor or its sureties from the Faithful Performance Bond, Labor and Material Payment Bond, or from any other obligation under this contract.

C. In case of suspension of the contract any unpaid balance shall be and become the sole and absolute property of the City to the extent necessary to repay the City any excess in the cost of the Work above the contract price.

D. Final payment shall be made no later than 60 days after the date of acceptance of the Work by the City or the date of occupation, beneficial use and enjoyment of the Work by the City including any operation only for testing, start-up or commissioning accompanied by cessation of labor on the Work, provided that a release of liens and -93- GENERAL CONDITIONS
claims has been received from the Contractor pursuant to Civil Code section 8136. In the event of a dispute between the City and the Contractor, the City may withhold from the final payment an amount not to exceed 150% of the disputed amount.

E. Within ten (10) calendar days from the time that all or any portion of the retention proceeds are received by Contractor, Contractor shall pay each of its subcontractors from whom retention has been withheld each subcontractor’s share of the retention received. However, if a retention payment received by Contractor is specifically designated for a particular subcontractor, payment of the retention shall be made to the designated subcontractor if the payment is consistent with the terms of the subcontract.

ARTICLE 46. OCCUPANCY
The City reserves the right to occupy or utilize any portion of the Work at any time before completion, and such occupancy or use shall not constitute acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.

ARTICLE 47. INDEMNIFICATION
To the fullest extent permitted by law, Contractor shall immediately defend (with counsel of the City’s choosing), indemnify and hold harmless the City, officials, officers, agents, employees, and representatives, and each of them from and against:

A. Any and all claims, demands, causes of action, costs, expenses, injuries, losses or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited to, injury to or death, including wrongful death, of any person, and damages to or destruction of property of any person, arising out of, related to, or in any manner directly or indirectly connected with the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses, however caused, regardless of whether the allegations are false, fraudulent, or groundless, and regardless of any negligence of the City or its officers, employees, or authorized volunteers (including passive negligence), except the sole negligence or willful misconduct or active negligence of the City or its officials, officers, employees, or authorized volunteers.

B. Contractor’s defense and indemnity obligation herein includes, but is not limited to damages, fines, penalties, attorney’s fees and costs arising from claims under the Americans with Disabilities Act (ADA) or other federal or state disability access or discrimination laws arising from Contractor’s Work during the course of construction of the improvements or after the Work is complete, as the result of defects or negligence in Contractor’s construction of the improvements.

C. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or liabilities, in law or equity, of every kind or nature whatsoever, arising out of, resulting from, or on account of the violation of any governmental law or regulation, compliance with which is the responsibility of Contractor;
-94- GENERAL CONDITIONS
D. Any and all losses, expenses, damages (including damages to the Work itself), attorney’s fees, and other costs, including all costs of defense which any of them may incur with respect to the failure, neglect, or refusal of Contractor to faithfully perform the Work and all of Contractor’s obligations under the agreement. Such costs, expenses, and damages shall include all costs, including attorney’s fees, incurred by the indemnified parties in any lawsuit to which they are a party.

Contractor shall immediately defend, at Contractor’s own cost, expense and risk, with the City Council’s choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against the City, its officials, officers, agents, employees and representatives. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against the City, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse the City, its officials, officers, agents, employees and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code section 2782.

ARTICLE 48. PROCEDURE FOR RESOLVING DISPUTES
Contractor shall timely comply with all notices and requests for changes to the Contract Time or Contract Price, including but not limited to all requirements of Article 44, Changes and Extra Work, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the Contract Price or Contract Time, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the Contract or at law.

A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Article shall be construed to be consistent with said statutes.

B. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with Article 44 “Changes and Extra Work” has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City. Claims governed by this Article may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the procedures contained in Article 44, Changes and Extra Work, and Contractor’s request for a change has been denied in whole or in part. Claims governed by this Article must be filed no later than the date of final payment. The claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing herein is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for -95- GENERAL CONDITIONS
extra Work, disputed Work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

C. Supporting Documentation. The Contractor shall submit all claims in the following format:

1. Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made

2. List of documents relating to claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other

3. Chronology of events and correspondence

4. Analysis of claim merit

5. Analysis of claim cost

6. Time impact analysis in CPM format

7. If Contractor’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the Project, Contractor shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.

D. City’s Response. Upon receipt of a claim pursuant to this Article, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 Days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 Days after the City issues its written statement.

1. If the City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City’s governing body does not meet within the 45 Days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three Days following the next duly publicly noticed meeting of the City’s governing body after the 45-Day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputedportion. -96- GENERAL CONDITIONS

2. Within 30 Days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor. The City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 Days (if the claim is less than $15,000, within 15 Days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever isgreater.

E. Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 Days of receipt of the City’s response or within 15 Days of the City’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 Days for settlement of the dispute.

F. Mediation. Within 10 business Days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 Days after the City issues its written statement. Any disputed portion of the claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business Days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.

1. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

2. For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has beencommenced.

4. The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.
-97- GENERAL CONDITIONS
G. Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference.

H. Civil Actions. The following procedures are established for all civil actions filed to resolve claims of $375,000 or less:

1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 Days by both parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

2. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

I. Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra Work, disputed Work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Sections 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra Work, disputed Work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted. -98- GENERAL CONDITIONS
J. Non-Waiver. The City’s failure to respond to a claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the claim being deemed rejected in its entirety.

ARTICLE 49. CITY’S RIGHT TO TERMINATE CONTRACT
A. Termination for Cause by the City:

1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the Work or any separable part thereof with such diligence as will insure its completion within the time specified by the Contract Documents, or any extension thereof, or fails to complete such Work within such time, or if the Contractor should be adjudged a bankrupt, or if it should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of its insolvency, or the Contractor or any of its subcontractors should violate any of the provisions of this Contract, the City may serve written notice upon the Contractor and its Surety of the City's intention to terminate this Contract. This notice of intent to terminate shall contain the reasons for such intention to terminate this Contract, and a statement to the effect that the Contractor's right to perform this Contract shall cease and terminate upon the expiration of ten (10) calendar days unless such violations have ceased and arrangements satisfactory to the City have been made for correction of said violations.

2. In the event that the City serves such written notice of termination upon the Contractor and the Surety, the Surety shall have the right to take over and perform the Contract. If the Surety does not: (1) give the City written notice of Surety's intention to take over and commence performance of the Contract within 15 calendar days of the City's service of said notice of intent to terminate upon Surety; and (2) actually commence performance of the Contract within 30 calendar days of the City's service of said notice upon Surety; then the City may take over the Work and prosecute the same to completion by separate contract or by any other method it may deem advisable for the account and at the expense of the Contractor.

3. In the event that the City elects to obtain an alternative performance of the Contract as specified above: (1) the City may, without liability for so doing, take possession of and utilize in completion of the Work such materials, appliances, plants and other property belonging to the Contractor that are on the site and reasonably necessary for such completion (A special lien to secure the claims of the City in the event of such suspension is hereby created against any property of Contractor taken into the possession of the City under the terms hereof and such lien may be enforced by sale of such property under the direction of the City Council without notice to Contractor. The proceeds of the sale after deducting all expenses thereof and connected therewith shall be credited to Contractor. If the net credits shall be in excess of the claims of the City against Contractor, the balance will be paid to Contractor or Contractor’s legal representatives.); and (2) Surety shall be liable to the City for any cost or other damage to the City necessitated by the City securing an alternate performance pursuant to this Article.

B. Termination for Convenience by the City:
-99- GENERAL CONDITIONS

1. The City may terminate performance of the Work called for by the Contract Documents in whole or, from time to time, in part, if the City determines that a termination is in the City's interest.

2. The Contractor shall terminate all or any part of the Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the convenience of the City, the extent of termination, and the Effective Date of such termination.

3. After receipt of Notice of Termination, and except as directed by the City's Representative, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this Termination for Convenience clause, immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.
c. Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Document is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.
d. Terminate all subcontracts to the extent that they relate to the portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) calendar days from the Effective Date of the Notice of Termination, all of the usual documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the Effective Date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the contractor is authorized under the Contract documents to incur, shall: (1) be submitted to and received by the Engineer no later than 30 calendar days after the Effective Date of the Notice of Termination; (2) describe the costs incurred with particularity; and (3) be conspicuously identified as “Termination Costs occasioned by the City's Termination for Convenience.”

4. Termination of the Contract shall not relieve Surety of its obligation for any just claims arising out of or relating to the Work performed.

5. In the event that the City exercises its right to terminate this Contract pursuant to this clause, the City shall pay the Contractor, upon the Contractor's submission of the documentation required by this clause and other applicable provisions of the Contract Documents, the following amounts:
-100- GENERAL CONDITIONS
12/2022
a. All actual reimbursable costs incurred according to the provisions of this Contract.
b. A reasonable allowance for profit on the cost of the Work performed, provided Contractor establishes to the satisfaction of the City's Representative that it is reasonably probable that Contractor would have made a profit had the Contract been completed and provided further, that the profit allowed shall in no event exceed fifteen (15%) percent of the costs.
c. A reasonable allowance for Contractor's administrative costs in determining the amount payable due to termination of the Contract under thisArticle.

C. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the City may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of the City or the Contract is terminated.

ARTICLE 50. WARRANTY AND GUARANTEE OF WORK
A. Contractor hereby warrants that materials and Work shall be completed in conformance with the Contract Documents and that the materials and Work provided will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or replace, at the discretion of the City, any or all Work that may prove to be defective in its workmanship, materials furnished, methods of installation or fail to conform to the Contract Document requirements together with any other Work which may be damaged or displaced by such defect(s) within a period of one (1) year from the date of the Notice of Completion of the Project without any expense whatever to the City, ordinary wear and tear and unusual abuse and neglect excepted. Contractor shall be required to promptly repair or replace defective equipment or materials, at Contractor’s option. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor.

B. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one (1) year period, commencing with the date of acceptance of such corrected Work. The reinstatement of the one (1) year warranty shall apply only to that portion of work that was corrected. Contractor shall perform such tests as City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. In the event of Contractor’s failure to comply with the abovementioned conditions within ten (10) calendar days after being notified in writing of required repairs, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense.

Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder immediately upon demand.

C. In addition to the warranty set forth in this Article, Contractor shall obtain for City all warranties that would be given in normal commercial practice and assign to City any and all manufacturer’s or installer’s warranties for equipment or materials not -101- GENERAL CONDITIONS
12/2022
manufactured by Contractor and provided as part of the Work, to the extent that such third-party warranties are assignable and extend beyond the warranty period set forth in this Article. Contractor shall furnish the City with all warranty and guarantee documents prior to final Acceptance of the Project by the City as required.

D. When specifically indicated in the Contract Documents or when directed by the Engineer, the City may furnish materials or products to the Contractor for installation.

In the event any act or failure to act by Contractor shall cause a warranty applicable to any materials or products purchased by the City for installation by the Contractor to be voided or reduced, Contractor shall indemnify City from and against any cost, expense, or other liability arising therefrom, and shall be responsible to the City for the cost of any repairs, replacement or other costs that would have been covered by the warranty but for such act or failure to act by Contractor.

E. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.

F. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) calendar days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect, or damage; the City shall have the right to replace, repair or otherwise remedy the defect, or damage at the Contractor’s expense.

G. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the City may undertake at Contractor’s expense, and without prior notice, all Work necessary to correct such condition.

H. Acceptance of Defective Work.

1. If, instead of requiring correction or removal and replacement of Defective Work, the City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to City’s evaluation of and determination to accept such Defective Work and for the diminished value of the Work.

2. If any acceptance of defective work occurs prior to release of the Project Retention, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work and all costs incurred by City.

3. If the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to City.

4. If the acceptance of Defective Work occurs after release of the Project Retention, an appropriate amount will be paid by Contractor to City. -102- GENERAL CONDITIONS
12/2022
I. City May Correct Defective Work.

1. If Contractor fails within a reasonable time after written notice from City’s Representative to correct Defective Work, or to remove and replace rejected Work as required by City, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) Days’ written notice to Contractor, correct, or remedy any such deficiency.

2. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, take possession of Contractor’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City and City’s Representative, and the agents, employees, other contractors, and consultants of each of them, access to the Site to enable City to exercise the rights and remedies to correct the Defective Work.

3. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by City correcting the Defective Work will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions into the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price.

4. Such claims, costs, losses and damages will include, but not be limited to, all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of Defective Work.

5. If the Change Order is executed after all payments under the Contract have been paid by City and the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to City.

6. If the Change Order is executed after release of the Project Retention, an appropriate amount will be paid by Contractor toCity.

7. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to City correcting Defective work.

J. Nothing in the Warranty or in the Contract Documents shall be construed to limit the rights and remedies available to City at law or in equity, including, but not limited to, Code of Civil Procedure section 337.15.

ARTICLE 51. DOCUMENT RETENTION & EXAMINATION
A. In accordance with Government Code section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.
-103- GENERAL CONDITIONS
12/2022
B. Contractor shall make available to the City any of the Contractor’s other documents related to the Project immediately upon request of the City.

C. In addition to the State Auditor rights above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the City, for a period of four (4) years after final payment.

ARTICLE 52. SEPARATE CONTRACTS
A. The City reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs.

B. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the Work in place or discrepancies with the Contract Documents.

C. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project. Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously.

The City shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project site.

ARTICLE 53. NOTICE AND SERVICE THEREOF
All notices shall be in writing and either served by personal delivery or mailed to the other party as designated in the Bid Forms. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to City shall be addressed to the City as designated in the Notice Inviting Bids unless City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) calendar days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.

ARTICLE 54. NOTICE OF THIRD PARTY CLAIMS
Pursuant to Public Contract Code section 9201, the City shall provide the Contractor with timely notification of the receipt of any third-party claims relating to the Contract. The City is entitled to recover reasonable costs incurred in providing such notification. -104- GENERAL CONDITIONS
12/2022
ARTICLE 55. STATE LICENSE BOARD NOTICE
Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

ARTICLE 56. INTEGRATION
A. Oral Modifications Ineffective. No oral order, objection, direction, claim or notice by any party or person shall affect or modify any of the terms or obligations contained in the Contract Documents.

B. Contract Documents Represent Entire Contract. The Contract Documents represent the entire agreement of the City and Contractor.

ARTICLE 57. ASSIGNMENT OF CONTRACT
Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the rights or title of interest of any or all of this contract without the prior written consent of the City. Any assignment or change of Contractor’s name of legal entity without the written consent of the City shall be void.

Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or Material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such Materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.

ARTICLE 58. CHANGE IN NAME AND NATURE OF CONTRACTOR’S LEGAL ENTITY Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected on the Contract and all related documents. No change of Contractor’s name or nature will affect City’s rights under the Contract, including but not limited to the bonds.

ARTICLE 59. ASSIGNMENT OF ANTITRUST ACTIONS
Pursuant to Public Contract Code section 7103.5, in entering into a public works contract or subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 USC, Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this contract or any subcontract. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgment by the parties.
-105- GENERAL CONDITIONS
12/2022
ARTICLE 60. PROHIBITED INTERESTS
No City official or representative who is authorized in such capacity and on behalf of the City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.

ARTICLE 61. CONTROLLING LAW
Notwithstanding any subcontract or other contract with any subcontractor, supplier, or other person or organization performing any part of the Work, this Contract shall be governed by the law of the State of California excluding any choice of law provisions.

ARTICLE 62. JURISDICTION; VENUE
Contractor and any subcontractor, supplier, or other person or organization performing any part of the Work agrees that any action or suits at law or in equity arising out of or related to the bidding, award, or performance of the Work shall be maintained in the Superior Court of Los Angeles County, California, and expressly consent to the jurisdiction of said court, regardless of residence or domicile, and agree that said court shall be a proper venue for any such action.

ARTICLE 63. LAWS AND REGULATIONS
A. Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified. If Contractor observes that drawings and specifications are at variance therewith, it shall promptly notify the Engineer in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in work. If Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Engineer, it shall bear all costs arising therefrom.

B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA regulations.

ARTICLE 64. PATENTS
Contractor shall hold and save the City, officials, officers, employees, and authorized volunteers harmless from liability of any nature or kind of claim therefrom including costs and expenses for or on account of any patented or unpatented invention, article or appliance manufactured, furnished or used by Contractor in the performance of this contract.

ARTICLE 65. OWNERSHIP OF CONTRACT DOCUMENTS
All Contract Documents furnished by the City are City property. They are not to be used by Contractor or any subcontractor on other work nor shall Contractor claim any right to such documents. With exception of one complete set of Contract Documents, all documents shall be returned to the City on request at completion of the Work. -106- GENERAL CONDITIONS
12/2022
ARTICLE 66. NOTICE OF TAXABLE POSSESSORY INTEREST
In accordance with Revenue and Taxation Code section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which Contractor will be responsible.

ARTICLE 67. SURVIVAL OF OBLIGATIONS
All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services ofContractor.

END OF GENERAL CONDITIONS
107 SPECIAL CONDITIONS
12/2022

SPECIAL CONDITIONS

1.1 Engineer of Record.

A. For purposes of this Project, the Engineer of Record or Engineer shall be Robert Delgadillo, PE.

1.2 Location of the Project.

A. The Project is located at various locations in the City of Azusa.

B. The general location of the Project is shown on the Reference Map.

1.3 Shared Cost Savings for Reductions in Contract Price; ValueEngineering.

NOT USED.

1.4 Status of the Project Area and Rights-of-Way.

A. City, at its expense, will provide all rights-of-way or permits, or both, covering the crossing of private property and public and private rights-of-way necessary for the permanent Work; provided, however, Contractor shall, at its expense, obtain any bonds or insurance policies or pay any fees and enter into any agreements required by a controlling authority, e.g., Caltrans or Union Pacific Railroad Company, before Contractor enters upon any property or right-of-way under the jurisdiction of any such controlling authority for the purpose of performing Work.

B. City has acquired or is negotiating to acquire any rights-of-way, or both, necessary for the permanent Work.

C. If such permits are required, all operations of Contractor shall conform to the restrictions, regulations, and requirements set forth in said permits, copies of which will be included in the Contract Documents.

D. Contractor may be required, as a condition for receiving final payment, to obtain, and provide City’s Representative with copies of, executed damage releases from the owners of public and private property whose property has been damaged by the Work.

The damage releases will be on a form provided by City.

E. Contractor shall, also, as a condition for receiving final payment, obtain, and provide City’s Representative with copies of, executed damage releases from the owners of certain public and private property or areas which have been crossed by the Work or otherwise affected by the Work. The damage releases will be on a form provided by City.

1.5 Site Data.

A. The data provided herein is for the information of Contractor and is subject to all limitations and conditions set forth in the Contract Documents.

B. Subsurface Exploration Data. The following data are included in the Project Manual:
108 SPECIAL CONDITIONS
12/2022
C. Other Site Data. The following data are available for inspection at City’s office:

1. Copies of these reports, drawings and other materials may be examined at City’s office during regular business hours.

1.6 Pre-Purchased or Pre-Negotiated Material.

NOT USED.

1.7 Designation of City’s Representative.

A. Unless otherwise modified by City, City’s Representative shall be Christina Curiel, [email protected] , (626) 812-5101.

1.8 Modification of Hours of Work.

Working hours for this project are 7:00 a.m. to 4:00 a.m. - Monday through Friday, excluding legal holidays and weekends.

The Contractor, subcontractors, suppliers, etc., shall not generate any noise at the work site, storage sites, staging areas, etc., before or after the normal working hours prescribed above. Should the Contractor elect to work outside normal working hours, Contractor must first obtain special permission from the Director of Public Works /City Engineer, and may be responsible for additional inspection fees.

1.9 Project Retention
In accordance with Public Contract Code § 7201, City will withhold 5% of each progress payment as retention on the Project.

1.10 RESERVED.

1.11 Liquidated Damages Due to Contractor Delay.

A. Time is of the essence. Should Contractor fail to complete all or any part of the Work within the time specified in the Contract Documents, City will suffer damage, the amount of which is difficult, if not impossible, to ascertain and, pursuant to the authority of Government Code section 53069.85, City shall therefore be entitled to $500 per Day as liquidated damages for each Day or part thereof that actual completion extends beyond the time specified.

B. Liquidated damages may be deducted from progress payments due Contractor, Project retention or may be collected directly from Contractor, or from Contractor's surety. These provisions for liquidated damages shall not prevent City, in case of Contractor's default, from terminating the Contractor.

1.12 Utility Outages – Notices to Residents.

A. Should Contractor’s operations require interruption of any utility service, Contractor shall notify City at least ten (10) Days prior to the scheduled outage. Contractor will notify all impacted residents on a form provided by City at least seven (7) Days prior to the scheduled outage.
109 SPECIAL CONDITIONS
12/2022
B. Contractor shall be responsible for providing, at its cost, any temporary utility or facilities necessitated by the utility outage.

1.13 Schedule Constraints.

NOT USED.

1.14 Noise Restrictions
A. Contractor shall use only such equipment on the Work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by Cal/OSHA.

B. Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operationrequirements.

C. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, theContractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.

1.15 Safety Programs.
[NOT USED.

1.16 Coordination with Other Contractors.

NOT USED.

END OF SPECIAL CONDITIONS
110 GENERAL REQUIREMENTS

GENERAL REQUIREMENTS
PART 1 -- GENERAL

1.1 NONE
PART 2 -- EXECUTION

2.1 LAYOUT OF WORK AND QUANTITYSURVEYS
General. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys required for the control and completion of the Work, and all necessary surveys to compute quantities of Workperformed.

City and/or the Engineer of Record has established primary control to be used by the Contractor for establishing lines and grades required for the Work.

Primary control consists of benchmarks and horizontal control points in the vicinity of the Work. A listing and identification of the primary control is provided on the Drawings.

Before beginning any layout work or construction activity, the Contractor shall check and verify primary control, and shall advise the City Representative of any discrepancies.

Quantity surveys. The Contractor shall perform such surveys and computations as are necessary to determine quantities of Work performed or placed during each progress payment period, and shall perform all surveys necessary for the City Representative to determine final quantities of Work in place. The City Representative will determine final quantities based upon the survey data provided by the Contractor, and the design lines and grades. If requested by the City Representative, the Contractor shall provide an electronic copy of data used for quantity computations.

All surveys performed for measurement of final quantities of Work and material shall be subject to approval of City’s Representative. Unless waived by City’s Representative in each specific case, quantity surveys made by the Contractor shall be made in the presence of City’s Representative.

Surveying

1. Accuracy. Degree of accuracy shall be an order high enough to satisfy tolerances specified for theWork and the following:
(a) Right-of-way and alignment of tangents and curves shall be within 0.1foot. (b) Structure points shall be set within 0.01 foot, except where operational function of the special features or installation of metalwork and equipment require closer tolerances. When formwork has been placed and is ready for concrete, the Contractor shall check the formwork for conformance with the drawings and to ensure that the forms are sufficiently within the tolerance limits for the completed work.
111 GENERAL REQUIREMENTS
(c) Cross-section points shall be located within 0.1 foot, horizontally and vertically. (d) Aerial Mapping shall meet National Mapping Standards for 2-foot contour intervals.

Records. Survey data shall be recorded in accordance with recognized professional surveying standards. Original field notes, computations, and other surveying data shall be recorded on electronic data collectors or in standard field books and must be of sufficient quality to enable the Contractor to prepare accurate record drawings as required by the Contract Documents.

Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required for surveys for the layout of work and quantity surveys shall be included in the Schedule of Pay Items for items of work requiring the surveys.

No additional compensation shall be made to the Contractor for this Work.

2.2 SCHEDULE
Estimated Schedule. Prior to the issuance of the Notice to Proceed, Contractor shall prepare a Project schedule and shall submit this to the Engineer for Approval. The receipt or Approval of any schedules by the Engineer or the City shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Contractor is fully responsible to determine and provide for any and all staffing and resources at levels which allow for good quality and timely completion of the Project. Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract time period. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the Engineer.

Schedule Contents. The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Project within the time specified for completion.

The overall Project Schedule duration shall be within the Contracttime.

Schedule Updates. Contractor shall continuously update its construction schedule.

Contractor shall submit an updated and accurate construction schedule to the Engineer monthly when requested to do so by Engineer. Contractor shall also submit schedules showing a three week detailed look-ahead at bi-weekly meetings conducted with the City. The Engineer may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule.

2.3 TEMPORARY FIELD OFFICE
NOT USED.

2.4 PROTECTION OF WORK AND PROPERTY
All traffic detector loops, fences, walls, culverts, property line monuments, or other obstructions (except property line monuments within five (5) feet of the centerline of 112 GENERAL REQUIREMENTS
the mains) which are removed, damaged, or destroyed in the course of the Work, shall be replaced or repaired to the original condition. If Contractor provides the City with reasonable notice of the need for such repair or replacement, it shall be performed by the City. If the Contractor fails to provide the City with reasonable notice, the repairor replacement shall be performed by and at the expense of the Contractor to the satisfaction of the City, whether or not those obstructions have been shown on the Plans, unless otherwise stated herein. It is then the Contractor’s responsibility to employ at its expense a Licensed Land Surveyor to restore all property line monuments located more than five (5) feet from the centerline of the mains, which are destroyed or obliterated. Property line monuments located within five (5) feet of the centerline of the mains will be replaced by the City at no expense to the Contractor, provided the City is notified at least 48 hours before the property line monuments are damaged.

Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.

Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by the Work operations. Contractor shall:

1. Enclose the working area with a substantial barricade, and arrange work tocause minimum amount of inconvenience and danger to the public.

2. Provide substantial barricades around any shrubs or trees indicated to be preserved.

3. Deliver materials to the Project site over a route designated by theEngineer.

4. Provide any and all dust control required and follow the Applicable air quality regulations as appropriate. If the Contractor does not comply, the City shall have the immediate authority to provide dust control and deduct the cost from payments to the Contractor.

5. Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the Engineer.

Contractor shall not unreasonably encumber the Project site with its materials.

6. Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by a civil engineer or land surveyor acceptable to the City, at no cost to the City.

7. Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the City.

8. Preserve and protect from injury all buildings, pole lines and all direction, warning and mileage signs that have been placed within the right-of-way.

9. At the completion of work each day, leave the Project site in a clean, safe condition. 113 GENERAL REQUIREMENTS

10. Comply with any stage construction and traffic control plans. Access to residences and businesses shall be maintained at all times, unless otherwise permitted in writing by the City.

These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the Work involved in the preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefore.

Should damage to persons or property occur as a result of the Work, Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The City shall be entitled to inspect and copy any such documentation, video, or photographs.

2.5 SITE CONDITIONS SURVEYS
Work Included.

Contractor shall conduct thorough pre-construction and post-construction site condition surveys of the entire project area. Site Conditions surveys shall include written documentation of the conditions found, as well as photographs and video recordings of the area within at least 80 feet of any construction area and staging area.

The written notes, photographs, and video shall be suitable for forensic purposes to resolve any damage claims that may arise as a result of construction.

Submittals.

1. Written documentation of site condition survey at pre-construction and postconstruction.

2. Photographs as described herein of pre-construction and post-construction conditions.

3. Video recordings as described herein of pre-construction and post-construction conditions.

4. Submittals shall be made within three days of the surveys. All post-construction data shall be submitted prior to the final project inspection.

Site Condition Written Documentation.

Written documentation shall include the time, date, and conditions under which the site survey was made. The documentation shall note the condition of structures, pavement, sidewalks, utilities, fences, and etc. within the work areas.

Photographs.

1. General – Contractor shall take enough photographs during each site survey to provide a record of conditions existing prior to construction and conditions after construction. Pre-construction photographs shall be taken prior to any construction or mobilization of equipment, but not more than one week prior to 114 GENERAL REQUIREMENTS
actual start of work. The pre-construction photographs may be staged at different times to match the progression of the Work.

2. The photographs shall document existing damage to public and private facilities, both prior to and after construction. Conditions to be documented include, but are not limited to: sidewalk cracks, broken curbs, separated property walls, improvements within public rights-of-way, access roads used, utility covers and markings, signs, pavement striping, pavement, unique or unusual conditions, adjacent driveways, landscaping, survey markers, and any feature directed by the Engineer. Private property that is adjacent to the public right-of-way shall be documented to the extent visible from the public right-of-way.

3. Photographs shall include items to indicate scale, as needed. In particular, scales or other items shall be laid next to close ups of structural cracks and other damaged areas being recorded. Scaling shall also be used to document elevation differences, as needed.

4. One set of color prints shall be submitted. Additional sets shall be available for reviewing in settling any construction disputes. A set of photos shall also be furnished in electronic format. The resolution shall be at least equal to 7 megapixels. All photos shall be documented as to time and date taken, photographer, project number, location, and orientation. Documentation shall include a brief description of objects photographed.

Video Recording.

1. Video recordings shall document the conditions of the entire area affected by construction, as well as nearby structures and facilities. The general documentation requirements for videos are the same as for photographs. Video recorders shall accurately and continuously record the time and date.

2. Video recordings shall include an audio portion made simultaneously during the videoing. The audio recording shall describe the location, time, orientation, and objects being recorded. Special commentary shall be provided for unusual conditions or damage noted.

3. Video equipment shall be capable of producing high resolution images and shall have zoom capabilities.

4. Video recordings shall provide an overall picture of the sites and shall provide detailed images of damaged areas. Video shall extend to the maximum height of structures.

5. The Engineer shall have the right to reject any audio video recordings submitted with unintelligible audio, uncontrolled pan or zoom, or of poor quality. Video recordings shall be repeated when rejected.
115 GENERAL REQUIREMENTS

6. Video recordings shall be submitted with labels indicating the project, date, recorder, and other pertinent information. Recordings shall be submitted on standard DVDs in a standard format.

Timing.

Contractor shall provide written notice of the time scheduled for the site conditions survey and the place it is to begin. Contractor shall obtain the Engineer’s concurrence prior to beginning the condition survey. The Engineer reserves the right to cancel the survey due to weather conditions or other problems. Videoing shall be done during times of good visibility and no videoing or photography shall be done during periods of visible precipitation or when standing water obscures pavement. Contractor shall provide the Engineer with an opportunity to have a representative present when taking the photos and provide guidance during photographing.

Site Surveyor.

The site condition surveyor(s) shall be experienced in construction and potential damage concerns. The site condition surveyor(s) shall be familiar with the photography and video equipment being used.

Field Quality Control.

Prior to submitting videos and photographs, the Contractor shall spot check the photos and videos in the field to insure they accurately reflect the actual conditions and to insure they are correctly labeled.

Soils Compaction Testing.

1. All soils compaction testing will be done by a licensed geotechnical engineer furnished and paid for by the Contractor and approved by the City. Soils compaction testing will be done for all footings and foundations prior to placement of rebar or concrete; for subgrade preparation, treated materials, and placement of base materials and roadway resurfacing per sections 301 and 302 of the latest Greenbook, Standard Specifications for Public Works Construction.

2. For pipeline construction, soil compaction testing will be done at 100-foot intervals at the bottom of the trench prior to placement of pipe bedding; at the top of the pipe bedding above the pipe; every two vertical feet of trench backfill; at the top of the trench backfill, which should be the bottom of the pavement section; and at the top of the aggregate base prior to pavement construction.

2.6 SUBMITTAL REQUIREMENTS FOR MANUALS AND RECORD DRAWINGS General. The Contractor shall furnish all materials and perform all Work required for furnishing submittals to City in accordance with Contract Documents.

Technical Manuals.

1. The Contractor shall submit technical operation and maintenance information for each item of mechanical, electrical and instrumentation equipment in an organized manner in the Technical Manual. It shall be written so that it can be used and understood by City’s operation and maintenance staff.
116 GENERAL REQUIREMENTS

2. The Technical Manual shall be subdivided first by specification section number; second, by equipment item; and last, by "Category." "Categories" shall conform to the following (asapplicable):
(a) Category 1 - Equipment Summary:
(1) Summary: A summary table shall indicate the equipment name, equipment number, and process area in which the equipment is installed. (b) Category 2 - Operational Procedures:
(1) Procedures: Manufacturer-recommended procedures on the following shall be included in Part 2:
a. Installation
b. Adjustment
c. Startup
d. Location of controls, special tools, equipment required, or related instrumentation needed for operation
e. Operation procedures
f. Load changes
g. Calibration
h. Shutdown
i. Troubleshooting
j. Disassembly
k. Reassembly
l. Realignment
m. Testing to determine performance efficiency
n. Tabulation of proper settings for all pressure relief valves, low and high pressure switches, and other protection devices
o. List of all electrical relay settings including alarm and contact settings
(c) Category 3 - Preventive Maintenance Procedures:
(1) Procedures: Preventive maintenance procedures shall include all manufacturer-recommended procedures to be performed on a periodic basis, both by removing and replacing the equipment or component, and by leaving the equipment in place.
(2) Schedules: Recommended frequency of preventive maintenance procedures shall be included. Lubrication schedules, including lubricant 117 GENERAL REQUIREMENTS
SAE grade, type, and temperature ranges, shall be covered. (d) Category 4 - Parts List:
(1) Parts List: A complete parts list shall be furnished, including a generic description and manufacturer's identification number for each part.

Addresses and telephone numbers of the nearest supplier and parts warehouse shall be included.
(2) Drawings: Cross-sectional or exploded view drawings shall accompany the parts list.
(e) Category 5 - Wiring Diagrams:
(1) Diagrams: Part 5 shall include complete internal and connection wiring diagrams for electrical equipment items.
(f) Category 6 - Shop Drawings:
(1) Drawings: This part shall include approved shop or fabrication drawings, complete with dimensions.
(g) Category 7 - Safety:
(1) Procedures: This part describes the safety precautions to be taken when operating and maintaining the equipment or working nearit. (h) Category 8 - Documentation:
(1) All equipment warranties, affidavits, and certifications required by the Technical Specifications shall be placed in this part.

3. The Contractor shall furnish to City six (6) identical Technical Manuals. Each set shall consist of one or more volumes, each of which shall be bound in a standard binder.

Spare Parts List - The Contractor shall furnish to City six (6) identical sets of spare parts information for all mechanical, electrical, and instrumentation equipment. The spare parts list shall include the current list price of each spare part. The spare parts list shall include those spare parts which each manufacturer recommends be maintained by City in inventory. Each manufacturer or supplier shall indicate the name, address, and telephone number of its nearest outlet of spare parts to assist City in ordering. The Contractor shall cross-reference all spare parts lists to the equipment numbers designated in the Contract Documents. The spare parts lists shall be bound in standard size, 3-ring binder.

Record Drawings

1. The Contractor shall maintain one record set of Drawings at the Site. On these, it shall mark all Project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented in the original Contract Documents, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Contract 118 GENERAL REQUIREMENTS
Drawings. Said record drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the Work as actually constructed. These master record drawings of the as-built conditions, including all revisions made necessary by Addenda and Change Orders shall be maintained up-to-date during the progress of the Project. Red ink shall be used for alterations and notes. Notes shall identify relevant Change Orders by number and date.

2. For all Projects involving the installation of any pipeline, Contractor shall survey and record the top of the pipe at a minimum of every 100 linear feet, and at each bend, recording both the horizontal and vertical locations.

3. Record drawings shall be accessible to City’s Representative at all times during the construction period. Failure on the Contractor’s part to keep record drawings current could result in withholding partial payment.

4. Upon Completion of the Project and as a condition of final acceptance, the Contractor shall finalize and deliver a complete set of Record Drawings to City’s Representative. The information submitted by the Contractor will be assumed to be correct, and the Contractor shall be responsible for, and liable to City, for the accuracy of such information, and for any errors or omissions which may or may not appear on the RecordDrawings.

Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete the Manuals and Record Drawings shall be included in Contractor’s bid and distributed in the Schedule of Pay. No additional compensation shall be made to the Contractor for this Work.

2.7 MATERIALS
Materials to be Furnished by the Contractor

1. Inspection of Materials. Materials furnished by the Contractor which will become a part of the Project shall be subject to inspection at any one or more of the following locations, as determined by City’s Representative: at the place of production or manufacture, at the shipping point, or at the site of the Work. To allow sufficient time to provide for inspection, the Contractor shall submit to City’s Representative, at the time of issuance, copies of purchase orders or other written instrument confirming procurement of the materials, including drawings and other pertinent information, covering materials on which inspection will be made.

2. No later than fourteen (14) Days prior to manufacture of material, Contractor shall inform City’s Representative, in writing, the date the material is to be manufactured.

3. Contractors Obligations. The inspection of materials at any of the locations specified above or the waiving of the inspection thereof shall not impact whether the materials and equipment conform to the Contract Documents. Contractor will not be relieved from furnishing materials meeting the requirements of the Contract Documents due to City’s inspection or lack of inspection of the equipment or materials. Acceptance of any materials will be made only after materials are installed in the Project.

4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to accommodate City’s testing efforts, 119 GENERAL REQUIREMENTS
including any travel required by Contractor’s forces, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items related to the materials requiring testing. No additional compensation shall be made to the Contractor for this Work.

2.8 LOCAL CONDITIONS ANDREQUIREMENTS
Access to Work and HaulRoutes

1. General. All work on the rights-of-way necessary for access to the Site shall be performed by the Contractor.

2. Access, Damage, Restoration. The Contractor shall make his own investigation of the condition of available public or private roads and of clearances, restrictions, bridge-load limits, permit or bond requirements, and other limitations that affect or may affect transportation and ingress or egress at the Site. Claims for changes in Contract Price or Contract Times arising out of the unavailability of transportation facilities or limitations thereon shall not be considered by City.

3. The Contractor shall maintain and repair any damage arising out of Contractor’s operations to all roads used during construction of the Project, and upon completion of all Work, but prior to final acceptance, the roads shall be restored to their original condition. Prior to using any road for access to the Site, the Contractor shall conduct a photograph and/or video survey of the roadway with a copy submitted to City’s Representative.

4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.

Power. Contractor shall provide at its own expense all necessary power required for operations under the contract. The Contractor shall provide and maintain in good order such modern equipment and installations as shall be adequate in the opinion of the Engineer to perform in a safe and satisfactory manner the Work required by the contract.

Construction Water.

1. Construction water shall not be used for purposes other than those required to satisfactorily complete the contract.

2. All connections to the Azusa Light & Water (ALW) water system used for the purposes of obtaining construction water shall utilize a temporary construction meter and backflow prevention device. The Contractor shall apply for a temporary water meter from ALW and pay all applicable fees & deposits. The Contractor shall pay for the temporary meter and all water used. The Contractor shall be responsible for furnishing and testing the backflow prevention device. The backflow prevention device shall be tested by a certified backflow tester immediately after it is installed and every time the backflow prevention device is moved. The backflow certification reports shall be filed with ALW immediately after the backflow prevention device is in place. The temporary construction meter and backflow prevention device shall not be placed into service until ALW confirms and approves that the backflow prevention device has passed such tests. 120 GENERAL REQUIREMENTS
Operation of Existing Water Facilities

1. The Contractor shall not operate any of the existing public water systems, including water mains, pumps, motors, valves and hydrants. The Contractor shall provide a list, reason and location of the water system facilities that require operating, opening, stopping or closure and provide to Azusa Light & Water (ALW) for review and approval.

2. Contractor shall submit a request to ALW one (1) week in advance for any shutdown of existing water facilities and shall comply with all ALW shut-down requirements.

Construction at Existing Utilities

1. General. Where the Work to be performed crosses or otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor shall perform construction in such a manner so that no damage will result to either public or private utilities. It shall be the responsibility of the Contractor to determine the actual locations of, and make accommodates to maintain, all utilities.

2. Permission, Notice and Liability. Before any utility is taken out of service, permission shall be obtained by the Contractor from the owner. The owner, any impacted resident or business owner and the City Representative will be advised of the nature and duration of the utility outage as well as the Contractor’s plan for providing temporary utilities if required by the owner. The Contractor shall be liable for all damage which may result from its failure to maintain utilities during the progress of the Work, and the Contractor shall indemnify City as required by the Contract Documents from all claims arising out of or connected with damage to utilities encountered during construction; damages resulting from disruption of service; and injury to persons or damage to property resulting from the negligent, accidental, or intentional breaching of utilities.

3. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.

Traffic Control

1. General. Contractor shall abide by traffic control plans approved by the appropriate jurisdiction.

2. Protections. Roads subject to interference by the Work shall be kept open or suitable temporary passages through the Work shall be provided and maintained by the Contractor. The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient flasher lights, flag persons, danger signals, and signs, and shall take all necessary precautions for the protection of the Work and the safety of the public. No construction work along public or private roads may proceed until the Contractor has proper barricades, flasher lights, flag persons, signals, and signs in place at the construction site.

3. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in 121 GENERAL REQUIREMENTS
Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.

Cleaning Up

1. Contractor at all times shall keep premises free from debris such as waste, rubbish, and excess materials and equipment. Contractor shall not store debris under, in, or about the premises. Contractor shall also clean all asphalt and concrete areas to the degree necessary to remove oil, grease, fuel, or other stains caused by Contractor operations or equipment. The use of water, resulting in mud on streets, will not be permitted as substitute for sweeping or other methods. Dust control may require having a water truck onsite for the duration of the project, and/or use of temporary hoses and pipelines to convey water.

2. Contractor shall fully clean up the site at the completion of the Work. If the Contractor fails to immediately clean up at the completion of the Work, the City may do so and the cost of such clean up shall be charged back to theContractor.

2.9 ENVIRONMENTAL QUALITYPROTECTION
Environmental Conditions

1. Contractor must comply with all applicable environmental laws, Project conditions, and constraints.

2. City has considered these Environmental Conditions when determining the Contract Times and no additional time or compensation will be added to the Contract due to these Conditions.

Landscape and Vegetation Preservation

1. General. The Contractor shall exercise care to preserve the natural landscape and vegetation, and shall conduct operations so as to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the Work.

2. Damage and Restoration. Movement of crews and equipment within the rights-ofway and over routes provided for access to the Work shall be performed in a manner to prevent damage to property. When no longer required, construction roads shall be restored to original contours.

3. Upon completion of the Work, and following removal of construction facilities and required cleanup, land used for construction purposes and not required for the completed installation shall be scarified and regraded, as required, so that all surfaces are left in a condition that will facilitate natural revegetation, provide for proper drainage, and preventerosion.

4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this Work, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.

Protected Species
122 GENERAL REQUIREMENTS

1. General. If, in the performance of the Work, evidence of the possible occurrence of any Federally listed threatened or endangered plant or animal is discovered, the Contractor shall notify the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to City within 2 Days.

2. Procedures. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the endangered plant or animal.

If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Any City directed changes to the Work as a result of a siting will be pursuant to the Contract Documents.

3. False Siting. Any costs or delays incurred by City or the Contractor due to unreasonable or false notification of an endangered plant or animal will be borne by the Contractor.

4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to comply with this paragraph, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.

Preservation of Historical and Archeological Resources

1. General. If, in the performance of the Work, Contractor should unearth cultural resources (for example, human remains, animal bones, stone tools, artifacts and/or midden deposits) through excavation, grading, watering or other means, the Contractor notify the Construction/Archeological Monitor and/or the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to the Construction/Archeological Monitor and/or City within 2 Days.

2. Procedures. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protectthe cultural resource.

If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or re-sequence and/or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Should the presence of cultural resources be confirmed, the Contractor will assist the City Representative and the Construction/Archeological Monitor in the preparation and implementation of a data recovery plan. The Contractor shall provide such cooperation and assistance as may be necessary to preserve the cultural resources for removal or other disposition. Any City directed changes to the Work as a result of the cultural resource will be pursuant to the Contract Documents.

3. Contractor’s Liability. Should Contractor, without permission, injure, destroy, excavate, appropriate, or remove any cultural resource on or adjacent to the Site, it will be subject to disciplinary action, arrest and penalty under applicable law. The 123 GENERAL REQUIREMENTS
Contractor shall be principally responsible for all costs of mitigation and/or restoration of cultural resources related to the unauthorized actions identified above. Contractor shall be required to pay for unauthorized damage and mitigation costs to cultural resources (historical and archeological resources) as a result of unauthorized activities that damage cultural resources and shall indemnify City pursuant to the Contract Documents.

4. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to comply with this paragraph, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.

Dust and Pollution Control

1. Contractor shall provide all necessary material, equipment and labor to prevent and control the emission of dust and any other potential pollutant on site.

2. Contractor shall not discharge into the atmosphere from any source smoke, dust or other air contaminants in violation of the law, rules, and regulations of the governing agency.

3. Cost. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to comply with this paragraph, shall be included in Contractor’s bid and distributed in the Schedule of Pay Items. No additional compensation shall be made to the Contractor for this Work.

Fugitive Dust
NOT USED.

OR

1. In addition to all other environmental and air quality requirements of the Contract Documents, Contractor must also comply with the most recent version of any rules implemented by the Air Quality Management District (AQMD) with jurisdiction over the Project in order to reduce the amount of particulate matter entrained in the ambient air as a result of the Project. All equipment shall be AQMD compliant and permitted, as needed.

2. City has considered these other requirements when determining the Contract Times and no additional time or compensation will be added to the Contract due to these requirements.

Management of Storm, Surface and Other Waters

1. Storm water, surface water, groundwater, and nuisance, or other waters may be encountered at various times during construction of the Project. Federal and State laws require the City and its contractors to manage such waters pursuant to the requirements of California State Water Resources Control Board Order Number 2009-0009-DWQ, the Federal Clean Water Act, and the California Porter Cologne Water Quality Control Act. Contractor acknowledges that it has investigated the risk arising from such waters in conjunction with the Project, and assumes any and all risks and liabilities arising therefrom.
124 GENERAL REQUIREMENTS

2. The Contractor shall perform all construction operations in such a manner as to comply, and ensure all subcontractors to comply, with all applicable Federal, State, and local laws, orders, and regulations concerning the control and abatement of water pollution; and all terms and conditions of any applicable permits issued for the Project. In the event there is a conflict between Federal, State, and local laws, regulations, and requirements, the most stringent shall apply.

3. Contractor violations. If noncompliance should occur, the Contractor shall report this to the City Representative immediately, with the specific information submitted in writing within 2 Days. Consistent violations of applicable Federal, State, or local laws, orders, regulations, or Water Quality Standards may result in City stopping all site activity until compliance is ensured. The Contractor shall not be entitled to any change in Contract Price or Contract Times, claim for damage, or additional compensation by reason of such a work stoppage. Corrective measures required to bring activities into compliance shall be at the Contractor's expense.

4. Compliance with Construction General Storm water Permit. Contractor shall be required to comply with all aspects of the State Water Resources Control Board (State Board) Water Quality Order No. 2009-0009-DWQ, National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity (Permit) for all projects that involve construction on or disturbance of one acre or more of land or which are part of a larger common area of development.
(a) Contractor shall prepare and implement a Storm Water Pollution Prevention Plan (SWPPP) for the Project site based on the appropriate Risk Level requirements, and draft and coordinate submittal of all Permit related documents with City’s Legally Responsible Person and/or Authorized Signatory as those terms are defined in the Permit. The Contractor shall submit the SWPPP to the City Representative for review not less than fifteen (15) Days prior to the start of on- site construction work. City will file the Notice of Intent and pay the filing fee.
(b) The SWPPP shall be developed by a Qualified SWPPP Developer and implemented by a Qualified SWPPP Practitioner as those terms are defined in the Permit and shall include industry standard requirements for water quality control including but not be limited to the following:
(1) Sediment and erosion control measures to manage sediment and erosion including vegetative practices, structural control, silt fences, straw dikes, sediment controls or operator controls as appropriate. Storm water management measures shall be instituted as required, including velocity dissipaters, and solid waste controls shall address controls for building materials and offsite tracking of sediment.
(2) Wastewater and storm water management controls to divert offsite surface flows around the Project site and to divert surface flows within the Project area away from areas of open earth or stockpiles of building and other materials. Wastewater from general construction activities, suchas drain water collection, aggregate processing, concrete batching, drilling, grouting, or other construction operations, shall not enter flowing or dry watercourses without having met the authorized non-storm water discharge requirements listed in State Board Water Quality Order No. 2009-0009-DWQ, Section III.C., including proper notification to the Regional Water Board.
125 GENERAL REQUIREMENTS
(3) Pollution prevention measures including methods of dewatering, unwatering, excavating, or stockpiling earth and rock materials which include prevention measures to control silting and erosion, and which will intercept and settle any runoff of sediment-laden waters. (4) Turbidity prevention measures for prevention of excess turbidity including, but are not restricted to, intercepting ditches, settling ponds, gravel filter entrapment dikes, flocculating processes, recirculation, combinations thereof, or other approved methods that are not harmful to aquatic life. All such wastewaters discharged into surface waters, shall contain the least concentration of settleable material possible, and shall meet all conditions of section 402, the National Pollutant Discharge Elimination System (NPDES) permit.
(5) Overall construction site management measures to address changes at the Project site as the Project moves through different phases and changes that account for rainy and dry season management practices. (6) Pollution control measures and construction activity methods that will prevent entrance, or accidental spillage, of solid matter, contaminants, debris, or other pollutants or wastes, into streams, flowing or dry watercourses, lakes, wetlands, reservoirs, or underground water sources.

Such pollutants and wastes include, but are not restricted to: refuse, garbage, cement, sanitary waste, industrial waste, hazardous materials, radioactive substances, oil and other petroleum products, aggregate processing, tailings, mineral salts, and thermal pollution. (7) Control measures for stockpiled or deposited materials prohibiting the stockpile or deposit of excavated materials, or other construction materials, near or on stream banks, lake shorelines, or other watercourse perimeters where they can be washed away by high water or storm runoff, or can, in any way, encroach upon the watercourse.
(8) Develop and implement a Rain Event Action Plan (REAP), if required, that must be designed and implemented to protect all exposed portions of the site 48 hours prior to any likely precipitation event.
(9) Monitoring, reporting and record keeping, as necessary to achieve compliance with applicable Permit requirements, including but not limited to annual reports and rain event reports.
(c) Before any Permit related documents, including the SWPPP, rain event reports, or annual reports may be submitted to the State Board or implemented on the Project site, they must first be reviewed and approved by City. (d) City retains the right to procure and maintain coverage under the Permit for the Project site if the Contractor fails to draft a SWPPP or other Permit related document, or fails to proceed in a manner that is satisfactory to City. City reserves the right to implement its own SWPPP at the Project site, and hire additional contractors to maintain compliance. Whether Contractor has adequately maintained compliance with the Permit shall be City’s sole determination. In the event that Contractor has failed or is unable to maintain compliance with the Permit, any costs or fines incurred by City in implementing a SWPPP, or otherwise maintaining compliance with the Construction General Permit shall be paid by theContractor.
126 GENERAL REQUIREMENTS
(e) Failure to implement the SWPPP or otherwise comply with the Permit is a violation of federal and state law. Contractor hereby agrees to indemnifyCity as required by the Contract Documents for any noncompliance or alleged noncompliance with the Permit arising out of or in connection with the Project, except for liability resulting from the sole established negligence, willful misconduct or active negligence of City. City may seek damages from Contractor for delay in completing the Contract in accordance with the Contract Documents, caused by Contractor’s failure to comply with the Permit.

5. In addition to compliance with the Permit, Contractor shall comply with the lawful requirements of any applicable municipality, district, drainage district, flood control district, and other local agencies regarding discharges of storm water, surface water, groundwater or other nuisance waters off of the Project site.

6. Oil storage tanks management.
(a) Storage tank placement. All oil or other petroleum product (hereinafter referred to collectively as oil) storage tanks shall be placed at least 20 feet from streams, flowing or dry watercourses, lakes, wetlands, reservoirs, and any other water source.
(b) Storage area dikes. Storage areas shall be diked at least 12 inches high or graded and sloped to permit safe containment of leaks and spills equal to the capacity of all tanks and/or containers located within each area, plus a sufficient amount of freeboard to contain the 25-year rainstorm. (c) Diked area barriers. Diked areas shall have an impermeable barrier at least 10 mils thick. Areas used for refueling operations shall have an impermeable liner at least 10 mils thick buried under 2 to 4 inches of soil. (d) Spill Prevention Control and Countermeasure Plan (SPCC). Where the location of a construction site is such that oil from an accidental spillage could reasonably be expected to enter into or upon the navigable waters of the United States or adjoining shorelines, and the aggregate storage of oil at the site is over 1,320 gallons or a single container has a capacity in excess of 660 gallons, the Contractor shall prepare an SPCC Plan. The Contractor shall submit the SPCC Plan to the Engineer at least 30 days prior to delivery or storage of oil at the site. The Plan must have been reviewed and certified by a registered professional engineer in accordance with 40 C.F.R., part 112

7. Underground tank prohibition. The Contractor shall not use underground storage tanks.

8. Construction safety standards. The Contractor shall comply with the sanitation and potable water requirements of Section 7 of United States Bureau of Reclamation's publication “Reclamation Safety And Health Standards.”

9. Other Permits.
(a) Other permits applicable to the Project are listed in the Special Conditions. The Contractor shall obtain all other necessary licenses and permits. (b) Monitoring. The Contractor is required to conduct monitoring in order to meet the requirements of the permits, which may include sampling, testing and inspections.
127 GENERAL REQUIREMENTS
(c) Recordkeeping. The Contractor shall retain all records and data required by the permits for the time specified in the contract.

10. Cost. Except as specified herein, the cost of complying with this section shall be included in the Schedule of Pay Items for work which necessitate the water pollution prevention measures required by this paragraph.

H California Air Resources Board (“CARB”)

1. Contractor shall comply, and shall ensure all subcontractors comply, with all applicable requirements of the most current version of the regulations imposed by California Air Resources Board (“CARB”) including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”).

2. Throughout the Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and its subcontractors’ fleets including, without limitation, the Certificates of Reported Compliance (“CRCs”), fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.

3. Cost. Contractor shall be solely liable for any and all costs associated with compliance with the Regulation as well as for any and all penalties, fines, damages, or costs associated with any and all violations, or failures to comply with the Regulation. Contractor shall defend, indemnify and hold harmless the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Regulation.

END OF GENERAL REQUIREMENTS
ATTACHMENT 1

FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:

The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. thirdparty correspondence or vendor bids).

The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).

The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.

Name of Bidder: ___________________________________________________ Signature: ________________________________________________________ Name: ___________________________________________________________ Title: ____________________________________________________________ Date: ____________________________________________________________

TECHNICAL SPECIFICATIONS
FOR

CATCH BASIN CONNECTOR PIPE SCREEN (CPS) INSERTS INSTALLATION PROJECT

ALL WORK SHALL CONFORM TO THE LATEST EDITIONS OF STANDARD PLANS AND SPECIFICATIONS OF THE

CITY OF AZUSA, CALTRANS, STANDARD PLANS & SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK); AND CALTRANS PERMANENT PEDESTRIAN FACILITIES ADA COMPLIANCE HANDBOOK. A COPY SHALL BE ON SITE AT ALL TIMES. ALL WORK SHALL BE SUBJECT TO CITY PUBLIC WORKS INSPECTOR’S ACCEPTANCE AS A CONDITION OF COMPLETION OF WORK BY THE CONTRACTOR.

ORDER OF WORK:
• A project schedule shall be submitted prior to the pre-construction meeting. • Prior to commencing work the Contractor shall submit the following items to the Engineer for review:

1. Baseline Schedule

2. Advanced Public Notification (Construction Notice)

3. Provide 24-Hr Emergency Contact (Name and Cell Number)

4. Designation of Project Superintendent

5. Traffic Control Plans

6. Material Submittals (on City of Azusa Submittal Review Form) • LA County approved shop drawings for CPS Retrofit Inserts NOTE: The City reserves the right to require additional submittals from the Contractor that are not specifically identified above.

BASELINE SCHEDULE:

The Contractor shall furnish to the Engineer a detail schedule. The Contractor shall adhere diligently to said detail schedule in the execution of the contract work. The schedule shall identify the day and date work is proposed on a given street segment. The work shall not start if the Contractor does not submit a detailed work schedule for review and approval.

The Contractor shall provide vehicular and pedestrian access to all businesses during the construction of the project.

ADVANCED PUBLIC NOTIFICATION:

The Contractor shall deliver the following notices in the form of a door hanger or a notification letter:
• Two (2) weeks prior to beginning work on a specific street segment, the Contractor shall deliver a written notice regarding the project to all members of the public affected, including but not limited to residents, businesses, and schools. Distribution of notices shall also include members of the public located on adjacent streets to which access will be restricted due to construction activities. The notice shall state the construction activities to occur with emphasis on the specific activities that will, in any way, inconvenience the public, affect their operations, or restrict access to their properties. The notice shall include the scheduled start dates and duration of construction work for each phase or activity. The name, email address, and 24-hour contact phone number of the Contractor’s Project Superintendent and the City’s contact for the project shall also be shown on the notice. • Three (3) days prior to the beginning of work on a specific street segment, the Contractor shall deliver another written notice to the same members of the public. The Contractor shall specifically mention the name of the street(s) where construction activities are scheduled. For each street, a two-day window when work is planned to occur shall be specified with start and end dates for the construction activities. The notice shall mention that actual work may occur on either day of the two-day window. Additional three-day notices shall be required if there is a prolonged break that exceeds two weeks in duration between work activities. The Engineer shall determine whether addition notices shall be required. Separate three-day notices are not required prior to weedremoval, tree trimming, or pavement striping if these activities are sufficiently described in the two-week notice and the notices have been delivered. • The Contractor shall not be permitted to perform work on a specific street segment until the required notices have been delivered.
• Copies of both notices shall be provided to the City for approval five (5) working days prior to the distribution date of each notice.

The Contractor shall notify the following agencies 2 weeks prior to the start of construction. Copies of the APPROVED advance construction notifications shall also be distributed to the agencies below.

The Azusa Police Department shall be notified 24 Hrs in advance of any lane/road closures. • Azusa Police Department Dispatch  (626) 812-3200
• Fire Department Station 32  (626) 334-0011
• Fire Department Station 97  (626) 334-5602
• U.S. Postal Service  (800) 275-8777
• Foothill Transit  (626) 931-7225
• Azusa Unified School District  (626) 858-4259
• Athens Services  (888) 336-6100
• Azusa Dial-A-Ride  (626) 812-5206
• Azusa Water  (626) 812-5063
• Azusa Electric  (626) 812-5172
• SoCal Gas  (909) 335-7825
24-HOUR EMERGENCY CONTACT:

The Contractor shall provide a 24-hour emergency contact to the City prior to commencing work.

DIG ALERT:

The Contractor shall notify Dig Alert 48 hrs prior to commencing work. The Contractor is responsible to provide a Dig Alert number to the City’s Public Works Inspector.

BID ITEM NO. 1 - MOBILIZATION, BONDS, INSURANCE AND DEMOBILIZATION:

This shall include full compensation for furnishing all labor and materials, including tools, equipment and incidentals, and for performing all of the work involved in placing, removing, storing, maintaining, moving to new locations, replacing, disposing of equipment, soils and materials testing as specified in the Standard Specifications and these Technical Specifications, and as directed by the Engineer. At the completion of the Work, Contractor must remove from the worksite all of its equipment, tools, surplus materials, waste materials and debris, presenting a clean and neat appearance. Before demobilizing from the Worksite, Contractor must ensure that all surfaces are cleaned, sealed, waxed, or finished as applicable, and that all marks, stains, paint splatters, and the like have been properly removed from the completed Work and the surrounding areas, leaving those areas in the condition originally found or better.

Payment
Bid Item No. 1 “Mobilization, Bonds, Insurance and Demobilization” is listed as a separate bid item and shall be paid as a Lump Sum (LS) and include but not be limited to, furnishing all labor, materials, tools, equipment, materials testing, and incidentals for mobilization, bonds, insurance and demobilization and no additional compensation will be made therefor.

BID ITEM NO. 2 - CONSTRUCTION SAFETY, TRAFFIC CONTROL, AND DAILY CLEANUP:

The Contractor shall furnish a traffic control plan for all catch basin locations from the CA MUTCD, WATCH,and/or CATTCH latest edition manuals. The traffic control plans must be reviewed and approved by the City prior to starting any work.

All traffic control plans shall include provisions for pedestrian access through the work zone during construction.

Payment
Bid Item No. 2 “Construction Safety, Traffic Control, and Daily Cleanup” is listed as a separate bid item and shall be paid as a Lump Sum (LS) and include but not be limited to, furnishing all labor, materials, tools, equipment, and incidentals for construction safety and traffic control, and daily cleanup, and no additional compensation will be made therefor.

BID ITEM NO. 3 – FURNISH AND INSTALL CONNECTOR PIPE SCREEN (CPS) (AT CITY OWNED CATCH BASIN LOCATIONS) AS PER LA
COUNTY STANDARDS. WORK SHALL INCLUDE CLEANING AND

REMOVAL OF ALL DEBRIS PRIOR TO INSTALLATION, AND FINAL

CLEANING AND REMOVAL OF ALL DEBRIS UPON COMPLETION OF
WORK AT EACH LOCATION:

Please refer to the Technical Provisions.

BID ITEM NO. 4 – FURNISH AND INSTALL CONNECTOR PIPE SCREEN (CPS) (AT LACFCD OWNED CATCH BASIN LOCATIONS) AS PER LA COUNTY STANDARDS. WORK SHALL INCLUDE CLEANING AND

REMOVAL OF ALL DEBRIS PRIOR TO INSTALLATION, AND FINAL

CLEANING AND REMOVAL OF ALL DEBRIS UPON COMPLETION OF
WORK AT EACH LOCATION:

Please refer to the Technical Provisions.

TP-1

TECHNICAL PROVISIONS
CATCH BASIN LOCATIONS RETROFIT DEVICE INSTALLATION :

1. Curb Opening and Grating Catch Basins
a. General:

The work specified in this subsection includes the furnishing and installation of Connector Pipe Screen for the pipe outlet, as described herein, into existing storm drain catch basins. These devices are intended to reduce the amount of trash entering the storm drain system through curb opening catch basins or a curb opening catch basin with gratings. All devices shall conform to the following requirements:

The catch basin identification numbers listed in the Catch Basin Table, in Appendix A, mark the location of the catch basins that shall receive a Connector Pipe Screen except as noted. b. Submittals:

Prior to initiating fabrication, the Contractor shall submit shop drawings, catalog cuts, and other information required which completely describes the units to be installed under this Contract per SSPWC Subsection 2-5.3.

Detailed shop drawings and descriptions of all components of the unit, showing all dimensions, materials used, connection details, assembly details, and mounting details. The shop drawings shall clearly describe the operation of the unit.
c. Installation details and instructions:
• Warranty information, including contact information for replacement parts. • Performance and test data, including a list of existing installations with a contact person from the owner of the facility in which each unit is installed and the date of installation.
• Recommended cleaning and maintenance schedule and procedures to maintain the proper functioning of the unit, including replacement schedule of parts for the entire unit.

Manufacturer’s Warranty: All devices included in this project shall be covered by a three (3) year manufacturer’s warranty, starting on the date of acceptance of the project by the AGENCY. The warranty shall cover the devices against corrosion, excessive wearing of moving parts, and operational malfunction of any reason. The manufacturer shall provide, at no cost to the AGENCY, all labor, material and equipment required to repair or replace the devices during the warranty period including, but not limited to, calibration and adjustment of moving parts to ensure the device operates properly. There shall be no limit to the number of repairs or replacements required during the warranty period to ensure that the devices operate properly.
d. Preliminary Inspection and Measurement:

The Contractor shall inspect each catch basin included in this Contract for unsound conditions TP-2
such as but not limited to: a) exterior damage, b) bent or missing protection bars, c) damaged manholes, d) damaged face plate, e) other physical damage, f) catch basins requiring protection bars per APWA Standard Plan 310-3. Since these types of conditions may interfere with the installation of retrofit devices, a list of catch basins with such unsound conditions shall be submitted to the Engineer per Subsection 2-5.3. The list shall also identify catch basins that, based on inspection, the Contractor determines are not suited for the type of device listed in the Catch Basin Table. Upon receipt of this information, the Engineer will substitute an appropriate device or a catch basin at a different location. Any subsequently disclosed damage to a catch basin not included in the list submitted by the Contractor will be assumed to be the result of the Contractor’s clean out or installation operations and shall be corrected at the Contractor’s expense.

The Contractor shall make detailed measurements of each catch basin for the proper fabrication of the devices. Improper fabrication of devices due to errors in the Contractor’s measurements shall be corrected at its own expense. The Contractor shall submit written records of its measurements to the Engineer per Subsection 2-5.3. The Contractor shall identify in the measurement records catch basins that, based on actual measurements, are not suited for the type of device listed in the Catch Basin Table. Upon receipt of this information, the Engineer will substitute an appropriate device or a catch basin at a different location.

Payment for preliminary inspection and measurement shall be per each as per bid item 3 and 4.

2. Cleaning of Existing Catch Basins
General: The contractor shall furnish all materials, equipment, tools and labor to clean out, i.e., remove trash and debris from within and around all catch basins in which retrofit devices will be installed under this Contract to the maintenance standards specified in this subsection. Clean out shall also include the catch basin connector pipe openings. The catch basin shall be clean at the time of the installation of the retrofit device. Any trash and debris that accumulates between the dates the catch basin is cleaned and the date the device will be installed shall be removed prior to installation of the device at the Contractor's expense.

Removal and Reinstallation of Catch Basin Manhole Covers: The Contractor shall remove the existing manhole cover as required to access the inside of the catch basin and shall reinstall the existing catch basin manhole cover whenever the catch basin is left unattended. Screws or bolts that cannot be reused and were not damaged by the Contractor shall be replaced with new ones meeting the requirements specified in the applicable standard plans as directed by the Engineer.

The Contractor’s attention is directed to the possibility that the catch basin cover screws may be frozen. It shall be the Contractor’s responsibility to remove these frozen cover screws. If during their removal the catch basin covers or screws should become damaged, it shall be the Contractor’s responsibility to replace them in accordance with the applicable standard plan and to redrill and tap new holes, if necessary, at no additional cost to the AGENCY. If heat is used to facilitate removal of frozen cover screws, the screws must be checked the following workday to verify that they have not refrozen.

Before leaving a catch basin, the Contractor shall thoroughly clean all debris from the manhole frame and cover. When replacing the catch basin covers, the Contractor shall grease all catch basin cover screws with a high temperature thread lubricant and seal grease (Jet-Lube by KoperKote or equal) and shall furnish and replace any missing screws.

TP-3
Maintenance Conditions and Maintenance Standards: Following are deficiencies in maintenance and their corresponding maintenance standards which shall apply to this Contract. The clean out of each catch basin shall meet the maintenance standards listed as follows:

Description of Maintenance
Description of Maintenance
Condition Deficiency
Description of
Maintenance Standard

1. Trash and debris located
immediately in front of curb opening
or side opening of catch basin, and
on top or between metal grates of
grated catch basin.

1. No trash and debris located
immediately in front of catch basin
opening, and on top or between metal
grates.

2. Vegetation growing across
and/or blocking the basin opening.

2. No vegetation blocking catch
basin opening.

3. Trash and debris in the basin. 3. No trash and debris within the catch basin.

1. Trash and debris in the
connector
pipe opening, upstream or
downstream.

4. No trash and debris in connector
pipe opening and/or in the connector
pipe for a distance of 6 feet inside from
the opening.

Trash and debris shall include, but is not limited to, mud, vegetation, and garbage.

Upon completion of a clean out operation at a catch basin and before leaving it, the Contractor shall sweep and clean the top surface of the catch basin and the area 2 feet around the basin, and shall remove any trash and debris resulting from the clean out operations. No debris is to be left at a catch basin for future pickup.

Method of Removal: All debris and trash required to be removed from the catch basins shall be removed in a manner to be determined by the Contractor. The Contractor shall not allow any trash or debris to enter the connector pipe or main line as a result of the clean out operations.

Debris Disposal: All debris and trash removed under this Contract shall become the property of the Contractor and shall be legally disposed of away from the basin sites. The Contractor is responsible for proper disposal of the debris and trash, including obtaining approvals from all jurisdictional agencies, as applicable. The Contractor shall be responsible for removing any dead animal from inside a catch basin. The Contractor shall also be responsible for contacting and coordinating with the appropriate agency or organization in charge with the pickup and disposal of dead animals.

TP-4
Prior to the start of the Work, the Contractor shall identify his intended disposal sites. In addition, the Contractor shall furnish to the Engineer at the end of each week the original or copies of all invoices or billings for the disposal of debris. The Contractor is responsible for reporting to the disposal facility, as accurately as practical, the jurisdictional percentage of the debris being disposed. These invoices must indicate the weights or volume of debris disposed.

Vehicles used by the Contractor to transport debris to approved dumpsites shall be so equipped that spillage does not occur. Covering of the load shall be required to prevent the debris from being blown off the transport vehicle. Vehicles and personnel operating these vehicles that do not comply with this requirement may be ordered removed from the project and shall not be utilized again.

Payment: Full Compensation for furnishing all labor, equipment, and materials for the clean out and disposal of trash and debris from catch basins, including dump fees, shall be considered as included in the other item of work and no separate payment thereof.

Bidders are advised that the quantity of debris located within each catch basin is unknown and, therefore, should be taken into consideration when preparing the bid.

3. Connector Pipe Screens (CPS)
General: The CPS prevents trash and debris from entering the storm drain system during dry weather and moderate storm flows by keeping the trash and debris inside the catch basin.

Requirements: The CPS shall be designed to retain all trash larger than 5 mm (0.197 inches) in the catch basin, and shall comply with the following items.

1. The CPS shall be size, fabricated and installed conforming to the configurations shown in Appendix I, prepared by the LACDPW

2. The CPS shall not interfere with the operation of the existing or proposed installed ARS.

3. The CPS unit shall have a sufficient structural integrity to withstand a lateral force of standing water (62.4 lb/ft3) within the catch basin area when the screen becomes 100% clogged. The CPS unit shall be bolted to the catch basin walls.

4. The CPS shall be configured with deflector plates or screens preventing trash from falling between the screen and connector pipe. The deflector plate shall be designed to withstand a vertical load of 10 lbs per square foot.

5. The gap at the bottom, sides, and joints of the CPS unit shall not exceed 5mm (0.197 inches).

6. The perimeter of the CPS shall include a structural frame for stiffness, a bolting surface to fasten the CPS to the wall of the catch basin, and support for the upper portion of the CPS unit referred as the “bypass” (see CPS Configuration Appendix I).

7. All parts/components of the CPS unit must be sized to fit through the catch basin’s manhole opening.

8. When the CPS unit encroaches more than 4 inches into the manhole opening, the Contractor shall install a Removable CPS unit. The Removable CPS unit shall be designed and installed with a removable panel allowing access into the catch basin. The removable panel shall be easily disengaged from the rest of CPS assembly upon entry or from the outside of the catch basin. The Contractor shall submit shop drawings for review and approval of the Agency, per Subsection 700-1.2.

9. Full compensation for furnishing and installing the removable CPS unit shall be paid under the Contract Unit Price for bid items 1 and 2 and no separate payment thereof.

TP-5

10. It is the responsibility of the Contractor to field verify the location and dimensions of these basins as listed in the List of Catch Basins in Appendix A.

11. The Contractor shall submit shop drawings, warranty, and technical memo for review and approval by the Agency. The Technical Manual shall be submitted prior to field acceptance of the permitted work. Full compensation for furnishing and installing the removable CPS unit shall be paid under the Contract Unit Price for Connector Pipe Screen Installation, and no separate payment thereof.

Materials and Fabrication: The CPS shall meet the following requirements:

1. The CPS frame shall be manufactured/fabricated from Type S-304 stainless steel, or an Agency approved equal stainless-steel alloy. TheStructural members shall have a minimum thickness of 3/16 inches.

2. The CPS screen shall be manufactured/fabricated from perforated metal of Type S304 stainless steel, or an Agency approved equal stainless-steel alloy. The screen shall have a minimum thickness of fourteen (14) gauge (0.0781 inches) The geometrical opening shape shall have a diameter of 5mm (0.197 inches).

3. The screen material used shall have at least 50% open area.

Any edge of the CPS that is not flush with the wall or floor of the catch basin shall be smooth with no prongs or jagged edges.

4. The assembly bolts, screws, nuts, and washers shall be fabricated entirely from Type S-316 stainless steel. The concrete anchor bolts shall use a Red Head Multi-Set II drop-in anchor, SSRM-38, with Type 316 stainless steel threaded rods, nuts and washers, or Agency approved equal.

Measurement and Payment: The CPS shall meet the following requirements: Connector Pipe Screens shall be at the contract unit price bid per each and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in the furnishing and installation of CPS units complete and in place, including, but not limited to, all submittals; prototype testing; costs associated with the 3- year warranty; onsite testing and calibration; painting of staff gauges on the catch basin wall; furnishing and installing. The retention and final payment will not be paid until the County Flood Control District approves installation of the CPS units. The installed CPS units shall meet all requirements shown in the approved permit issued by the County.

4. Temporary Traffic Control for Construction and Maintenance Work Zones The Contractor shall be responsible to furnish, install and maintain such devices which are necessary to provide safe and efficient passage for the traveling public through the work area, for the safety of personnel present in the work area, and to minimize inconvenience to adjacent properties.

The Contractor shall be responsible to furnish, install and maintain such devices which are necessary to provide safe and efficient passage for the traveling public through the work area, for the safety of personnel present in the work area, and to minimize inconvenience to adjacent properties.

All work and materials to implement construction staging and traffic control shall comply with the California Manual of Uniform Traffic Controls Device (CAMUTCD). Signs, markings, striping, barricades, delineators and all materials shall conform to applicable Caltrans standards and specifications. Arrow boards and other devises must comply with the City of Azusa requirements for nighttime noise standards at adjacent private property lines.

TP-6
The use of flagmen may be required if deemed so by the Engineer. Adequate flagmen, construction sign barricades, delineators, and arrow boards shall be used to the satisfaction of the Engineer. Adequate traffic control shall be maintained at all times through the construction zone, in compliance with the California Manual on Uniform Traffic Control Devices.

It shall be the Contractor’s responsibility to notify affected businesses and residences within the project in writing within 10 days prior to the start of construction.

Traffic control through the project area shall conform to the requirements of Section 7-10, “Public Convenience and Safety,” (SSPWC).

Holiday Period: No reduction in the number of lanes or in lane widths on any street shall be permitted during the holiday period which begins on the Monday prior to Thanksgiving and ends on the Friday following New Year's Day.

Temporary No Parking Signs: The Contractor is responsible to post "Temporary No Parking" signs at least 5 working days in advance of the first date of enforcement. The City shall be informed before posting of signs. Parking will be restricted only for the minimum time necessary to complete on-going work.

Payment: Full Compensation for furnishing all labor, equipment, and materials for traffic control, shall be considered as included in the other item of work and no separate payment thereof.

TP-7

STANDARDS
TP-8
TP-9
TP-10
TP-11
TP-12

CITY OF AZUSA
Azusa: County Location List - Citywide Full Trash Capture Device No.

Device To Be
Inastalled
City
ID

LACFCD CB
ID
Ownership Street Nearest Cross Street Side of
Street
Number of
Grates
Outlet Pipe
Diameter
(in)
CB Type
(SPPWC
Std.)
CB
Width"W"
(ft)
Curb
Face
Height
V
Depth
(in)
CPS
Inspections Tech Date Hb(in)
L
(in)
Hs
(in)
B
(in)
G
(in) Comments Latitude Longitude
1 CPS 113 2254032 CITY San Gabriel Canyon Rd Crystal Canyon Dr N/E 0 24 300 10 10 56 YES LJ/JR 10/17/2025 12 72 24 11 10 34.154966 -117.91086 2 CPS 114 2254006 CITY Ranch Rd Shady Oaks Ct N/W 0 18 300 7 11 28 YES LJ/JR 10/17/2025 8 48 8 11 1 34.15506 -117.909521 3 CPS 128 2254004 CITY San Gabriel Canyon Rd Mirador Dr N/E 0 24 300 10 13 55 YES LJ/JR 10/17/2025 12 72 24 11 6 34.157764 -117.911219 4 CPS 163 2254030 CITY San Gabriel Canyon Rd DayBreak Dr N/E 0 24 300 14 10 65 YES LJ/JR 10/17/2025 12 72 24 11 18 34.156152 -117.911184 5 CPS 337 N/A CITY Ranch Rd Shady Oaks Ct N/W 0 36 300 21 11 54 YES LJ/JR 10/17/2025 12 84 24 11 7 34.154991 -117.909492 6 CPS 354 N/A CITY San Gabriel Canyon Rd Cypress Ct N/E 0 20 300 14 11 54 YES LJ/JR 10/17/2025 12 72 24 11 7 34.152768 -117.910354 7 CPS 296 2254012 CITY Crystal Canyon Dr Fern Ct S/E 0 18 300 3.5 10 36 YES LJ/JR 10/17/2025 12 36 20 11 4 34.149586 -117.909418 8 CPS 355 N/A CITY San Gabriel Canyon Rd W Ellsworth St N/E 0 26 300 14 10 70 YES LJ/JR 10/17/2025 N/A 72 24 11 36 34.150111 -117.909695 9 CPS 23 2255062 CITY E Sierra Madre Ave N Nob Hill Dr N/W 4 18 302 14 11 51 YES LJ/JR 10/17/2025 10 60 18 11 12 34.146951 -117.904483 10 CPS 84 2255070 CITY E Sierra Madre Ave N Hilltop Dr N/W 0 18 300 3.5 10 41 YES LJ/JR 10/17/2025 8 36 18 11 5 34.146933 -117.907228 11 CPS 238 2255069 CITY E Sierra Madre Ave N Hilltop Dr N/E 0 20 300 3.5 10 43 YES LJ/JR 10/17/2025 8 36 18 11 7 34.146906 -117.907139 12 CPS 297 2255061 CITY E Sierra Madre Ave N Nob Hill Dr N/E 4 20 302 14 12 42 YES LJ/JR 10/17/2025 10 60 12 11 8 34.147026 -117.904413 13 CPS 255 2255229 CITY N Tam O Shanter Dr St Andrews Ln N/W 1 18 304 42 x 25.5 6 30 YES LJ/JR 10/17/2025 9 30 9 11 12 34.144315 -117.911303 14 CPS 302 2255076 CITY N Deborah Ave W Lori Ann Ave N/E 0 18 300 3.5 11 69 YES LJ/JR 10/17/2025 12 36 24 11 22 34.144299 -117.91542 15 CPS 47 2255284 CITY W Sierra Madre Ave N Todd Ave N/W 1 20 301 7 10 98 YES LJ/JR 10/17/2025 12 48 18 11 58 34.143543 -117.925018 16 CPS 303 2255283 CITY W Sierra Madre Ave N Todd Ave S/W 0 20 300 7 11 63 YES LJ/JR 10/17/2025 12 48 24 11 16 34.143328 -117.925086 17 CPS 147 2298119 CITY E 8th St Stein Way S/E 0 18 300 3.5 10 42 YES LJ/JR 10/17/2025 8 36 10 11 24 34.135375 -117.901072 18 CPS 148 2298120 CITY E 8th St Stein Way S/E 0 26 300 3.5 10 81 YES LJ/JR 10/17/2025 12 36 24 11 35 34.135348 -117.900700 19 CPS 191 2298250 CITY E 8th St Stein Way S/E 0 24 300 3.5 10 74 YES LJ/JR 10/17/2025 12 36 24 11 28 34.135348 -117.900757 20 CPS 195 2298112 CITY N Pasadena Ave E 9th St S/E 0 18 300 3.5 10 30 YES LJ/JR 10/17/2025 8 36 8 11 14 34.137179 -117.902271 21 CPS 160 2255202 CITY N McKeever Ave W Danlee St N/E 2 18 303 7 N/A 30 YES LJ/JR 10/17/2025 9 48 9 11 12 34.136009 -117.914463 22 CPS 6 2255215 CITY W 8th St N Coney Ave N/E 0 30 300 14 12 96 YES LJ/JR 10/17/2025 12 72 24 11 48 34.136297 -117.921719 23 CPS 239 2255214 CITY W 8th St N Georgia Ave N/E 0 24 300 7 10 26 YES LJ/JR 10/17/2025 12 48 20 11 6 Unable to open manhole. Bolts are rusted. 34.136140 -117.918359 24 CPS 284 2255216 CITY W 8th St N Coney Ave S/E 0 36 300 14 12 112 YES LJ/JR 10/17/2025 12 74 124 11 63 34.136223 -117.921695 25 CPS 274 2255237 CITY N Vernon Ave W Crescent Dr N/E 0 42 300 21 12 83 YES LJ/JR 10/17/2025 12 84 24 11 35 34.138278 -117.916138 26 CPS 275 2255226 CITY N Vernon Ave W Crescent Dr N/W 2 18 302 7 8 36 YES LJ/JR 10/17/2025 9 48 9 11 10 34.138333 -117.916258 27 CPS 136 2255261 CITY W 10th St N Todd Ave N/E 0 26 300 14 9 55 YES LJ/JR 10/17/2025 12 72 24 11 10 34.139846 -117.922437 28 CPS 207 2255247 CITY W 10th St N Todd Ave S/E 0 28 300 21 9 64 YES LJ/JR 10/17/2025 12 84 24 11 24 34.139774 -117.922321 29 CPS 59 2212205 CITY Encanto Pkwy Hacienda Dr N/E 0 24 300 3.5 9 45 YES LJ/JR 10/17/2025 10 36 18 11 8 34.142489 -117.938068 30 CPS 189 2212226 CITY Encanto Pkwy Hacienda Dr S/E 0 18 300 3.5 9 47 YES LJ/JR 10/17/2025 N/A 36 20 11 18 34.142387 -117.938042 31 CPS 13 2255253 CITY W Foothill Blvd Irwindale Ave N/E 0 36 300 21 10 110 YES LJ/JR 10/17/2025 12 84 24 11 64 34.133767 -117.928655 32 CPS 57 2255248 CITY W Foothill Blvd Irwindale Ave S/E 0 18 300 14 12 71 YES LJ/JR 10/17/2025 12 72 24 11 23 34.133569 -117.929061 33 CPS 279 2255267 CITY W Foothill Blvd Irwindale Ave S/E 0 24 300 21 123 53 YES LJ/JR 10/17/2025 12 84 24 11 5 34.133549 -117.928521 34 CPS 283 2255236 CITY W Foothill Blvd Irwindale Ave N/E 0 24 300 14 10 42 YES LJ/JR 10/17/2025 8 72 18 11 6 34.133775 -117.928420 35 CPS 5 2255094 CITY W Foothill Blvd N Loren Ave N/E 2 18 302 14 9 53 YES LJ/JR 10/17/2025 10 48 18 11 16 34.133995, -117.923763 36 CPS 122 2255095 CITY W Foothill Blvd N Loren Ave S/W 2 18 302 7 10 71 YES LJ/JR 10/17/2025 10 48 18 11 33 34.133796 -117.923822 http://dpw.lacounty.gov/fcd/stormdrain/disclaimer.cfm
EXHIBIT A: CITY PROVIDES THE FOLLOWING INFORMATION
Field Data
37 CPS 123 2255093 CITY W Foothill Blvd N Loren Ave N/E 2 18 302 10 10 67 YES LJ/JR 10/17/2025 10 48 18 11 29 34.133882 -117.923772 38 CPS 197 2255099 CITY W Foothill Blvd N Todd Ave N/W 0 24 307 10 11 68 YES LJ/JR 10/17/2025 12 48 18 11 27 34.133820 -117.925050 39 CPS 233 2255092 CITY W Foothill Blvd N Loren Ave N/E 0 16 300 3.5 10 75 YES LJ/JR 10/17/2025 12 36 24 11 29 34.133729 -117.923455 40 CPS 234 2255097 CITY W Foothill Blvd N Todd Ave N/E 0 24 300 10 12 91 YES LJ/JR 10/17/2025 12 72 24 11 42 34.133735 -117.924610 41 CPS 237 2255098 CITY W Foothill Blvd N Todd Ave N/E 2 18 302 21 10 63 YES LJ/JR 10/17/2025 10 48 18 11 25 34.133838 -117.924832 42 CPS 281 2255100 CITY W Foothill Blvd N Todd Ave N/W 0 18 307 21 11 56 YES LJ/JR 10/17/2025 12 48 18 11 15 34.133938 -117.925049 43 CPS 282 2255096 CITY W Foothill Blvd N Loren Ave N/W 2 18 302 21 9 58 YES LJ/JR 10/17/2025 10 48 18 11 21 34.133904 -117.923844 44 CPS 140 2255256 CITY E Foothill Blvd Rte/Hwy 39 N/W 1 10 302 7 10 45 YES LJ/JR 10/17/2025 10 30 12 11 13 34.133643 -117.907721 45 CPS 172 2255262 CITY E Foothill Blvd Rte/Hwy 39 N/W 2 24 302 10 10 41 YES LJ/JR 10/17/2025 10 48 12 11 9 34.133823 -117.907611 46 CPS 190 2255239 CITY E Foothill Blvd Rte/Hwy 39 N/E 3 18 302 10 10 44 YES LJ/JR 10/17/2025 10 60 18 11 6 34.133816 -117.907485 47 CPS 236 2255266 CITY E Foothill Blvd Rte/Hwy 39 S/W 1 10 302 7 9 48 YES LJ/JR 10/17/2025 10 32 18 11 11 34.133459 -117.907711 48 CPS 12 2255153 CITY E Foothill Blvd N Dalton Ave N/W 0 18 300 14 13 61 YES LJ/JR 10/17/2025 12 72 24 11 12 34.133677 -117.905020 49 CPS 42 2298121 CITY E Foothill Blvd N Soldano Ave N/E 0 18 300 7 12 48 YES LJ/JR 10/17/2025 12 48 20 11 4 34.133697 -117.903671 50 CPS 134 2255152 CITY E Foothill Blvd N Dalton Ave N/E 0 20 300 7 12 100 YES LJ/JR 10/17/2025 12 48 24 11 52 34.133673 -117.904898 51 CPS 153 2255208 CITY E Foothill Blvd N Soldano Ave S/W 0 16 300 3.5 15 48 YES LJ/JR 10/17/2025 12 36 20 11 1 34.133376 -117.903718 52 CPS 154 2255157 CITY E Foothill Blvd N Dalton Ave S/E 2 24 301 21 11 72 YES LJ/JR 10/17/2025 12 60 18 11 31 CB has 36" of standing water. 34.133271 -117.904908 53 CPS 169 2255154 CITY E Foothill Blvd N Dalton Ave N/W 0 20 300 7 13 48 YES LJ/JR 10/17/2025 12 48 20 11 3 34.133624 -117.905103 54 CPS 206 2255150 CITY E Foothill Blvd N Soldano Ave N/W 0 18 300 3.5 13 54 YES LJ/JR 10/17/2025 12 36 24 11 5 34.133614 -117.903826 55 CPS 213 2255151 CITY E Foothill Blvd N Soldano Ave N/W 0 20 300 14 12 63 YES LJ/JR 10/17/2025 12 72 24 11 15 34.133709 -117.903744 56 CPS 280 2255155 CITY E Foothill Blvd N Dalton Ave S/W 0 18 300 3.5 12 41 YES LJ/JR 10/17/2025 8 36 18 11 3 34.133449 -117.905084 57 CPS 43 2298242 CITY E Foothill Blvd N Cerritos Ave S/E 0 18 300 7 12 60 YES LJ/JR 10/17/2025 12 48 24 11 12 34.133405 -117.899869 58 CPS 94 2298137 CITY E Foothill Blvd N Cerritos Ave N/E 4 24 303 14 N/A 50 YES PDL/AS 10/17/2025 12 60 22 11 16 34.133615 -117.900005 59 CPS 52 2298142 CITY E Foothill Blvd E Alosta Ave N/E 0 18 300 3.5 9 27 YES LJ/JR 10/17/2025 8 36 8 11 14 34.133574 -117.895973 60 CPS 54 2298140 CITY E Foothill Blvd E Alosta Ave N/E 0 18 300 5 12 62 YES LJ/JR 10/17/2025 12 36 24 11 16 34.133569 -117.896205 61 CPS 86 2298244 CITY E Foothill Blvd Palm Dr N/W 0 16 300 7 8 53 YES PDL/AS 10/12/2025 12 4 24 11 8 34.133547 -117.893412 62 CPS 102 2298243 CITY E Foothill Blvd Palm Dr N/W 0 18 300 14 12 60 YES PDL/AS 10/17/2025 12 6 24 11 12 34.133718 -117.893219 63 CPS 196 2298246 CITY E Foothill Blvd N Citrus Ave N/W 0 16 300 3.5 10 74 YES PDL/AS 10/17/2025 12 3 24 11 27 34.133609 -117.89016 64 CPS 271 2298245 CITY E Foothill Blvd Palm Dr N/W 0 20 300 14 8 53 YES PDL/AS 10/17/2025 12 6 24 11 9 34.133546 -117.891614 65 CPS 340 N/A CITY E Foothill Blvd Palm Dr N/E 0 24 300 14 9 40 YES PDL/AS 10/17/2025 8 6 18 11 4 34.133551 -117.892932 66 CPS 150 2298265 CITY N Citrus Ave E Foothill Blvd S/E 2 16 302 7 14 41 YES PDL/AS 10/17/2025 9 4 9 9 34.132351 -117.889994 67 CPS 235 2298264 CITY N Citrus Ave E Foothill Blvd S/E 0 20 300 21 10 90 YES PDL/AS 10/17/2025 12 7 24 11 43 34.132162 -117.889998 68 CPS 330 N/A CITY N Cerritos Ave E 5th St S/E 0 12 300 7 10 36 YES PDL/AS 10/17/2025 8 4 12 11 5 34.129190 -117.899390 69 CPS 331 N/A CITY N Cerritos Ave E 5th St S/E 0 14 300 7 11 38 YES PDL/AS 10/17/2025 8 4 12 2 - 11 6 34.129172 -117.899274 70 CPS 332 N/A CITY E 5th St N Cerritos Ave S/E 0 12 300 3.5 15 41 YES PDL/AS 10/17/2025 8 3 18 11 0 34.129766 -117.898194 71 CPS 333 N/A CITY E 5th St N Cerritos Ave S/E 0 12 300 7 16 46 YES PDL/AS 10/17/2025 12 4 20 2 - 11 0 34.129865 -117.897897 72 CPS 334 N/A CITY N Cerritos Ave E 5th St N/E 0 16 300 7 10 40 YES PDL/AS 10/17/2025 8 4 12 11 7 34.12986 -117.899476 73 CPS 121 2298159 CITY Rockvale Ave E 6th St. S/W 0 18 300 8 12 36 YES PDL/AS 10/17/2025 8 4 12 11 3 34.130868 -117.896265 74 CPS 157 2298160 CITY Rockvale Ave E 6th St. N/E 0 18 300 6 10 46 YES PDL/AS 10/17/2025 12 4 20 11 3 34.13086 -117.896176 75 CPS 344 N/A CITY E Alosta Ave E 5th St N/E 0 26 307 22 11 87 YES PDL/AS 10/17/2025 12 5 18 11 45 34.129901 -117.893207 76 CPS 345 N/A CITY E Alosta Ave E 5th St S/E 0 20 300 21 11 80 YES PDL/AS 10/17/2025 12 7 24 11 32 34.130272 -117.893812 77 CPS 346 N/A CITY E Alosta Ave E 5th St S/E 0 16 300 14 10 87 YES PDL/AS 10/17/2025 12 6 24 11 40 34.13048 -117.894104 78 CPS 347 N/A CITY E Alosta Ave E 5th St S/E 0 18 300 3.5 11 40 YES PDL/AS 10/17/2025 8 3 18 11 3 34.130722 -117.894372 79 CPS 341 N/A CITY N Citrus Ave E Alosta Ave N/W 0 26 300 21 11 60 YES PDL/AS 10/17/2025 12 7 24 11 12 34.129090 -117.890225 80 CPS 342 N/A CITY N Citrus Ave E Alosta Ave N/W 0 24 300 21 10 47 YES PDL/AS 10/17/2025 12 7 20 11 4 34.129206 -117.890232 81 CPS 349 N/A CITY E Alosta Ave N Citrus Ave N/W 0 20 307 28 15 60 YES PDL/AS 10/17/2025 12 6 18 2 - 11 14 34.128665 -117.889804 82 CPS 352 N/A CITY N Citrus Ave E Alosta Ave N/E 0 24 300 14 11 90 YES PDL/AS 10/17/2025 12 6 24 11 42 34.129108 -117.889995 83 CPS 167 2299267 CITY E Mauna Loa Ave N Factor Ave N/E 0 18 300 14 9 103 YES PDL/AS 10/17/2025 12 6 24 11 57 34.125188 -117.887924 84 CPS 8 2256232 CITY E 1st St N Dalton Ave N/W 0 20 300 21 12 42 YES PDL/AS 10/12/2025 8 7 18 11 3 34.121690 -117.905121 85 CPS 61 2299150 CITY N Pasadena Ave E Duell St S/E 0 38 X 40 300 25 16 48 YES PDL/AS 10/17/2025 N/A 7 24 11 8 34.123332 -117.902491 86 CPS 65 2256237 CITY E 1st St N Dalton Ave N/W 0 18 300 7 10 60 YES PDL/AS 10/17/2025 12 4 24 11 13 34.121833 -117.905095 87 CPS 85 2256259 CITY E 1st St N Dalton Ave N/E 0 18 300 14 10 82 YES PDL/AS 10/17/2025 12 6 24 11 35 34.121731 -117.905012 88 CPS 87 2299148 CITY N Pasadena Ave E Duell St N/E 0 16 300 10 14 60 YES PDL/AS 10/17/2025 12 6 24 2 - 11 9 34.123114 -117.902557 89 CPS 116 2299149 CITY N Pasadena Ave E Duell St S/E 0 31 300 25 16 57 YES PDL/AS 10/17/2025 12 7 24 11 4 34.123253 -117.902500 90 CPS 118 2299137 CITY E 1st St N Pasadena Ave S/W 0 18 300 14 10 50 YES PDL/AS 10/17/2025 12 6 20 11 7 34.121515 -117.903401 91 CPS 146 2256261 CITY E 1st St N Azusa Ave N/E 1 24 303 3.5 0 38 YES PDL/AS 10/17/2025 9 30 9 11 20 34.121757 -117.907498 92 CPS 44 2256262 CITY Solem St Aspan Ave N/W 0 18 300 7 10 67 YES PDL/AS 10/17/2025 12 4 24 11 20 34.118764 -117.919311 93 CPS 129 2256213 CITY S Jackson Ave W Paramount St N/E 0 18 300 7 11 74 YES PDL/AS 10/17/2025 12 4 24 11 26 34.118111 -117.920636 94 CPS 137 2256210 CITY Solem St S Virginia Ave S/W 0 16 300 3.5 11 48 YES PDL/AS 10/17/2025 12 3 20 11 4 34.118617 -117.918736 95 CPS 175 2256257 CITY Solem St Aspan Ave N/E 0 16 300 3.5 10 64 YES PDL/AS 10/17/2025 12 3 24 11 17 34.118835 -117.919241 96 CPS 219 2256236 CITY S Jackson Ave Jerez Ave N/W 0 18 300 3.5 10 58 YES PDL/AS 10/17/2025 12 3 24 11 11 34.119928 -117.920785 97 CPS 269 2256209 CITY Solem St S Virginia Ave N/W 0 18 300 3.5 10 48 YES PDL/AS 10/17/2025 12 3 20 11 5 34.118680 -117.918708 98 CPS 287 2256233 CITY S Jackson Ave Jerez Ave N/E 0 16 300 3.5 10 69 YES PDL/AS 10/17/2025 12 3 24 11 22 34.119841 -117.920527 99 CPS 305 2256239 CITY S Jackson Ave Solem St N/E 0 18 300 7 11 61 YES PDL/AS 10/17/2025 12 4 24 11 13 34.118683 -117.920553 100 CPS 81 2256172 CITY Vernon Ave W Gladstone St. N/W 1 18 301 14 9 34 YES PDL/AS 10/17/2025 8 4 10 11 7 34.114471 -117.916506 101 CPS 155 2256173 CITY Vernon Ave W Gladstone St. N/E 1 18 301 14 10 40 YES PDL/AS 10/17/2025 10 4 12 2 - 11 7 34.114520 -117.916352 102 CPS 156 2256174 CITY Vernon Ave W Gladstone St. N/E 0 28 300 7 10 46 YES PDL/AS 10/17/2025 12 4 20 11 3 34.114390 -117.916221 103 CPS 162 2256244 CITY N Larke Ellen Ave E Payson St. N/W 4 36 302 14 13 60 YES PDL/AS 10/17/2025 10 5 18 2 - 11 20 34.111903 -117.916522 104 CPS 26 2256176 CITY S Louise Ave W Gladstone St. N/E 0 18 300 7 9 54 YES PDL/AS 10/17/2025 12 4 24 11 8 34.114569 -117.914914 105 CPS 50 2256181 CITY S Enid Ave W Gladstone St. N/E 0 16 300 14 11 48 YES PDL/AS 10/17/2025 12 6 20 11 4 34.114356 -117.913515 106 CPS 58 2256175 CITY S Louise Ave W Gladstone St. N/W 0 18 300 10 10 56 YES PDL/AS 10/17/2025 12 6 24 11 9 34.114531 -117.914988 107 CPS 60 2256177 CITY W Gladstone St. S Louise Ave N/E 0 18 300 5 10 37 YES PDL/AS 10/17/2025 8 4 12 11 5 34.114370 -117.914804 108 CPS 276 2256180 CITY S Enid Ave W Gladstone St. S 0 18 300 3.5 10 48 YES PDL/AS 10/17/2025 12 3 20 11 4 34.114234 -117.913643 109 CPS 277 2256178 CITY S Enid Ave W Gladstone St. N/W 0 18 300 3.5 10 56 YES PDL/AS 10/17/2025 12 3 24 11 9 34.114428 -117.913739 110 CPS 1 2299202 CITY E Gladstone St. S Citrus Ave N/W 0 18 300 10 13 46 YES PDL/AS 10/17/2025 12 6 20 11 0 34.114438 -117.890291 111 CPS 101 2299203 CITY E Gladstone St. S Citrus Ave N/E 1 18 302 4 13 40 YES PDL/AS 10/17/2025 10 2.5 12 11 4 34.114453 -117.890131 112 CPS 95 2299151 CITY E Gladstone St. S Pasadena Ave N/E 0 29 300 7 10 44 YES PDL/AS 10/17/2025 12 4 20 11 1 34.114289 -117.902420 113 CPS 229 2299152 CITY E Gladstone St. N Cerritos Ave N/W 0 18 300 15 13 30 YES PDL/AS 10/17/2025 8 6 8 11 0 34.114423 -117.899485 114 CPS 76 2256194 CITY S Azusa Ave E Gladstone St. S/E 2 28 302 21 10 45 YES PDL/AS 10/17/2025 12 6 12 11 7 34.114161 -117.907089 115 CPS 161 2256216 CITY S Azusa Ave E Gladstone St. N/E 0 36 300 21 14 73 YES PDL/AS 10/17/2025 12 84 24 11 23 34.114405 -117.907529 116 CPS 228 2256192 CITY S Azusa Ave E Gladstone St. N/E 0 37 300 30 12 67 YES PDL/AS 10/17/2025 12 7 24 11 18 34.114335 -117.907483 117 CPS 307 2256193 CITY S Azusa Ave E Gladstone St. S/E 0 20 300 16 10 45 YES PDL/AS 10/17/2025 12 6 20 11 2 34.114171 -117.907342 118 CPS 133 2256164 CITY S Azusa Ave E Newburgh St N/E 0 24 300 7 11 45 YES PDL/AS 10/17/2025 8 4 18 2 - 11 7 34.110568 -117.907536 119 CPS 170 2256163 CITY S Azusa Ave E Newburgh St N/E 0 18 300 10 13 63 YES PDL/AS 10/17/2025 12 6 24 11 13 34.110309 -117.907462 120 CPS 96 2256258 CITY S Azusa Ave Arrow Hwy N/E 0 20 300 7 10 52 YES PDL/AS 10/17/2025 12 4 24 N/A N/A 34.107748 -117.907808 121 CPS 243 2256217 CITY S Azusa Ave Arrow Hwy S/E 0 24 300 3.5 11 72 YES PDL/AS 10/17/2025 12 3 24 11 24 34.107765 -117.907547 122 CPS 270 2256249 CITY Leton Ave South St S/E 0 24 300 10 13 36 YES PDL/AS 10/17/2025 8 6 12 11 1 34.107817 -117.907437 Azusa: County Location List - Citywide Full Trash Capture Device No.

Device
To Be
Installed
CB
ID
Ownership Street Nearest Cross Street Side of
Street
Number
of Grates
Outlet
Pipe
Diameter
(in)
CB Type
(SPPWC
Std.)
CB
Width"W"
(ft)
Curb
Face
Height
"X"
V Depth
(in)
CPS
Inspections Tech Date Comments Latitude Longitude
1 CPS 49 CITY W Sierra Madre Ave N Sunset Ave N/E/S 4 18 303 13 9 41 YES RC 4/7/2026 34.146993 -117.911294 2 CPS 82 CITY W Sierra Madre Ave N Sunset Ave N/W/S 4 18 303 13 9 45 YES RC 4/7/2026 34.146922 -117.911385 3 CPS 356 CITY E Viewcrest Dr Hibiscus Ave N/W/C 0 18 300 14 10 74 YES RC 4/7/2026 34.148064 -117.903220 4 CPS 27 CITY E Viewcrest Dr Hibiscus Ave N/E/C 0 18 300 3.5 13 38 YES RC 4/7/2026 34.148179 -117.902944 5 CPS 380 CITY Hawthorn Way N Crape Myrtle Dr N/E/C 0 18 300 7 12 128 YES RC 4/7/2026 34.143609 -117.893491 6 CPS 379 CITY Hawthorn Way N Crape Myrtle Dr N/W/C 0 24 300 7 13 133 YES RC 4/7/2026 34.143576 -117.893551 7 CPS 424 CITY Orchid Way Clementine Ct N/W/S 0 18 300 7 10 33 YES RC 4/7/2026 34.137623 -117.892824 8 CPS 425 CITY Orchid Way Clementine Ct N/W/S 0 18 300 3.5 10 32 YES RC 4/7/2026 34.137578 -117.892818 9 CPS 433 CITY Iris Way Clementine Ct N/W/S 0 18 300 7 10 38 YES RC 4/7/2026 34.137271 -117.892852 10 CPS 434 CITY Iris Way Clementine Ct N/W/S 0 18 300 7 9 38 YES RC 4/7/2026 34.137200 -117.892823 11 CPS 432 CITY Orchid Way Clementine Ct S/E/S 0 18 300 3.5 10 58 YES RC 4/7/2026 34.137181 -117.891784 12 CPS 431 CITY Orchid Way Clementine Ct S/E/S 0 18 300 3.5 10 58 YES RC 4/7/2026 34.137241 -117.891876 13 CPS 430 CITY Iris Way Clementine Ct S/E/S 0 18 300 7 10 61 YES RC 4/7/2026 34.137174 -117.891161 14 CPS 429 CITY Iris Way Clementine Ct S/E/S 0 18 300 7 10 70 YES RC 4/7/2026 34.137245 -117.891173 15 CPS 428 CITY Orchid Way Clementine Ct N/E/S 0 18 300 3.5 10 64 YES RC 4/7/2026 34.137545 -117.891374 16 CPS 427 CITY Orchid Way Clementine Ct N/E/S 0 18 300 7 10 51 YES RC 4/7/2026 34.137614 -117.891401 17 CPS 426 CITY Orchid Way Clementine Ct N/E/S 0 18 300 3.5 8 63 YES RC 4/7/2026 34.137616 -117.891422

CITY OF AZUSA
EXHIBIT A: CITY PROVIDES THE FOLLOWING INFORMATION
http://dpw.lacounty.gov/fcd/stormdrain/disclaimer.cfm Field Data Azusa: County Location List - Citywide Full Trash Capture Device No. Device ID Device
Installation Ownership Drain Name Street Name Nearest Street Side of Street Number
of Grates
Outlet Pipe
Diameter
(in)
CB Type
(SPPWC
Std.)
CB
Width"W"
(ft)
Curb Face
Height
"X"
"Y"
(V-X)
V Depth
(in)
CPS
Inspections Tech Date Hb(in)
L
(in)
Hs
(in)
B
(in)
G
(in)
Comments Latitude Longitude
1 2254028 CPS LACFCD SAN AZUSA DRAIN RANCH RD RIDGE VIEW DR NE 0 24 300 14 10 32 42 YES LJ/JR 10/10/2025 8 72 18 11 6

34.155095 -117.909446
2 2254007 CPS LACFCD SAN AZUSA DRAIN RANCH RD RIDGE VIEW DR NE 0 24 300 14 10 32 42 YES LJ/JR 10/10/2025 8 72 18 11 6

34.154963 -117.9094
3 2254027 CPS LACFCD SAN AZUSA DRAIN RANCH RD RIDGE VIEW DR SW 0 18 300 7 10 63 73 YES LJ/JR 10/10/2025 12 48 24 11 27

34.153369 -117.909125
4 2254008 CPS LACFCD SAN AZUSA DRAIN RANCH RD RIDGE VIEW DR NE 0 24 300 14 10 30 40 YES LJ/JR 10/10/2025 8 72 18 11 4

34.152763 -117.908959
5 2254009 CPS LACFCD SAN AZUSA DRAIN RANCH RD SUSANNAA CT NW 0 20 300 10 10 39 49 YES LJ/JR 10/10/2025 12 72 20 11 7

34.151476 -117.908924
6 2254010 CPS LACFCD SAN AZUSA DRAIN RANCH RD SUSANNAA CT SE 0 25 300 14 10 27 37 YES LJ/JR 10/10/2025 8 72 14 11 5

34.151057 -117.908797
7 2254013 CPS LACFCD SAN AZUSA DRAIN RANCH RD RUNNING DR NW 0 18 300 7 10 28 38 YES LJ/JR 10/10/2025 8 48 12 11 8

34.149415 -117.908803
8 2254014 CPS LACFCD SAN AZUSA DRAIN RANCH RD RUNNING DR NE 0 18 300 7 10 23 33 YES LJ/JR 10/10/2025 8 48 12 11 3

34.149818 -117.90873
9 2254015 CPS LACFCD SAN AZUSA DRAIN RANCH RD RUNNING DR SW 0 18 300 10 10 59 69 YES LJ/JR 10/10/2025 12 72 24 11 23

34.148695 -117.908726
10 2254016 CPS LACFCD SAN AZUSA DRAIN RANCH RD RUNNING DR SW 0 20 300 10 10 55 65 YES LJ/JR 10/10/2025 12 72 24 11 1934.148768 -117.908733 11 2254017 CPS LACFCD SAN AZUSA DRAIN RANCH RD RUNNING DR SE 0 18 300 3.5 10 24 34 YES LJ/JR 10/10/2025 8 36 12 11 434.148664 -117.908639 12 2255066 CPS LACFCD SAN AZUSA DRAIN W SIERRA MADRE AVE SAN GABRIEL CANYON RD NE 0 18 300 21 8 25 33 YES LJ/JR 10/10/2025 8 84 12 11 534.146819 -117.908105 13 2255071 CPS LACFCD SAN AZUSA DRAIN SAN GABRIEL CANYON RD RANCH RD SE 1 16 302 3 9 40 49 YES LJ/JR 10/10/2025 10 32 18 11 1234.147255 -117.908499 14 2255072 CPS LACFCD SAN AZUSA DRAIN RANCH RD SAN GABRIEL CANYON RD NE 1 16 302 3 10 22 32 YES LJ/JR 10/10/2025 9 32 9 11 434.147358 -117.908526 15 2255001 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE N VERNON AVE SW 0 18 300 3.5 12 44 56 YES LJ/JR 10/10/2025 12 36 24 11 834.142453 -117.918866 16 2255002 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE VERNON AVE NW 3 18 302 10 9 41 50 YES LJ/JR 10/10/2025 10 60 18 11 1334.142648 -117.919018 17 2255003 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE VERNON AVE SE 0 18 300 3.5 12 42 54 YES LJ/JR 10/10/2025 12 36 24 11 634.142827 -117.917659 18 2255004 CPS LACFCD CRESCENT DRAIN VERNON AVE 10TH ST NE 1 18 302 14 10 33 43 YES LJ/JR 10/10/2025 10 32 12 11 1134.139467 -117.916084 19 2255005 CPS LACFCD CRESCENT DRAIN VERNON AVE 10TH ST SE 0 20 300 21 10 39 49 YES LJ/JR 10/10/2025 12 84 20 11 734.139667 -117.916099 20 2255077 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE AVE DE LA SUERTE SE 0 18 300 3.5 12 35 47 YES LJ/JR 10/10/2025 12 36 20 11 334.142427 -117.921002 21 2255078 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE AVE CONEJO SE 0 18 300 3.5 13 51 64 YES LJ/JR 10/10/2025 12 36 24 11 1534.143002 -117.922938 22 2255079 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE AVE CONEJO NE 0 24 300 3.5 12 31 43 YES LJ/JR 10/10/2025 8 36 18 11 534.143173 -117.922714 23 2255080 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE AVE DE LA SUERTE NE 0 24 300 3.5 12 42 54 YES LJ/JR 10/10/2025 12 36 24 11 634.142719 -117.921326 24 2255081 CPS LACFCD BEATTY CANYON STORM DRAIN AVE DE LA SUERTE SIERRA MADRE AVE NE 2 20 302 7 12 42 54 YES LJ/JR 10/10/2025 10 48 18 11 1434.14287 -117.921421 25 2255082 CPS LACFCD BEATTY CANYON STORM DRAIN AVE DE LA SUERTE SIERRA MADRE AVE NW 0 18 300 7 11 28 39 YES LJ/JR 10/10/2025 8 48 18 11 234.142918 -117.921542 26 2255083 CPS LACFCD BEATTY CANYON STORM DRAIN AVE DE CONEJO SIERRA MADRE AVE NE 2 18 302 7 9 38 47 YES LJ/JR 10/10/2025 10 48 18 11 1034.1432928 -117.9227937 27 2255084 CPS LACFCD BEATTY CANYON STORM DRAIN AVE DE CONEJO SIERRA MADRE AVE NW 0 18 300 7 12 20 32 YES LJ/JR 10/10/2025 8 48 10 11 234.1433388 -117.92293 28 2255217 CPS LACFCD ENCANTO WAY FISH CANYON RD NW 0 24 300 25 9 41 50 YES RC/RIC 1/21/2026 12 84 24 11 434.147562 -117.933001 29 2255254 CPS LACFCD BEATTY CANYON STORM DRAIN SIERRA MADRE AVE TODD AVE NE 0 24 300 3.5 12 56 68 YES LJ/JR 10/10/2025 12 36 24 11 2034.143546 -117.924717 30 2255274 CPS LACFCD BEATTY CANYON STORM DRAIN TODD AVE SIERRA MADRE AVE SE 0 18 300 3.5 12 30 42 YES LJ/JR 10/10/2025 8 36 18 11 434.143221 -117.924824 31 2255085 CPS LACFCD BI 9718 FOOTHILL BLVD CONEY AVE SE 0 18 300 7 10 20 30 YES LJ/JR 10/10/2025 8 48 8 11 434.13351 -117.921638 32 2255086 CPS LACFCD BI 9718 FOOTHILL BLVD CONEY AVE NE 0 18 300 7 9 38 47 YES LJ/JR 10/10/2025 12 48 20 2 - 11 1634.133738 -117.921614 33 2255087 CPS LACFCD BI 9718 FOOTHILL BLVD MILLER AVE NE 0 20 300 14 10 43 53 YES LJ/JR 10/10/2025 12 72 24 2 - 11 734.133732 -117.920529 34 2255089 CPS LACFCD BI 9718 MILLER AVE FOOTHILL AVE SE 0 18 300 3.5 12 24 36 YES LJ/JR 10/10/2025 8 36 12 11 434.133849 -117.920804 35 2255090 CPS LACFCD BI 9718 CONEY AVE FOOTHILL AVE NE 0 18 300 10 12 43 55 YES LJ/JR 10/10/2025 12 72 24 11 734.133856 -117.921758 EXHIBIT A: CITY PROVIDES THE FOLLOWING INFORMATION
http://dpw.lacounty.gov/fcd/stormdrain/disclaimer.cfm Field Data

CITY OF AZUSA
36 2255091 CPS LACFCD BI 9718 CONEY AVE FOOTHILL AVE NW 0 18 300 7 12 39 51 YES LJ/JR 10/10/2025 12 48 20 11 10

34.133853 -117.921894
37 2255183 CPS LACFCD BI 9718 N VIRGINIA AVE W FOOTHILL BLVD SE 0 18 300 3.5 10 79 89 YES LJ/JR 10/10/2025 12 36 24 11 4334.132981 -117.917928 38 2255185 CPS LACFCD BI 9718 W FOOTHILL BLVD VIRGINIA AVE SW 0 18 300 3.5 8 33 41 YES LJ/JR 10/10/2025 8 36 18 11 734.133513 -117.91902 39 2255186 CPS LACFCD BI 9718 GEORGIA AVE W FOOTHILL BLVD NW 0 18 300 10 10 42 52 YES LJ/JR 10/10/2025 12 72 24 11 634.133814 -117.918465 40 2255187 CPS LACFCD BI 9718 GEORGIA AVE W FOOTHILL BLVD NW 0 20 300 10 11 46 57 YES LJ/JR 10/10/2025 12 72 24 11 1034.133822 -117.918335 41 2255188 CPS LACFCD BI 9718 W FOOTHILL BLVD GEORGIA AVE NW 0 20 300 14 11 31 42 YES LJ/JR 10/10/2025 8 72 18 11 534.133711 -117.918191 42 2255189 CPS LACFCD BI 9718 W FOOTHILL BLVD N VIRGINIA AVE NE 0 18 300 10 9 47 56 YES LJ/JR 10/10/2025 12 72 24 11 1134.13371 -117.91779 43 2255190 CPS LACFCD BI 9718 W FOOTHILL BLVD N VIRGINIA AVE SE 1 24 302 7 6 62 68 YES LJ/JR 10/10/2025 10 32 18 11 3434.133502 -117.91785 44 2255191 CPS LACFCD NULL GEORGIA AVE W INDUSTRIAL ST SW 0 20 300 14 12 55 67 YES LJ/JR 10/10/2025 12 72 24 11 1934.134411 -117.918458 45 2255192 CPS LACFCD BI 9718 GEORGIA AVE W INDUSTRIAL ST SW 2 18 303 3 N/A 54 54 YES LJ/JR 10/10/2025 12 48 22 11 2034.1341 -117.91846 46 2255193 CPS LACFCD BI 9718 GEORGIA AVE W INDUSTRIAL ST SE 2 18 303 3 N/A 39 39 YES LJ/JR 10/10/2025 12 48 22 11 2534.134095 -117.918331 47 2255194 CPS LACFCD NULL GEORGIA AVE W INDUSTRIAL ST SE 0 24 300 7 12 63 75 YES LJ/JR 10/10/2025 12 48 24 11 2734.134447 -117.918325 48 2255196 CPS LACFCD CRESCENT DRAIN N VERNON AVE W INDUSTRIAL ST SE 0 24 300 28 10 36 46 YES LJ/JR 10/10/2025 12 96 20 11 434.134047 -117.916139 49 2255197 CPS LACFCD CRESCENT DRAIN W FOOTHILL BLVD N VERNON AVE NE 0 20 300 7 10 59 69 YES LJ/JR 10/10/2025 12 48 24 11 2334.133874 -117.915989 50 2255198 CPS LACFCD CRESCENT DRAIN W FOOTHILL BLVD N VERNON AVE SE 0 20 300 7 9 38 47 YES LJ/JR 10/10/2025 12 48 20 11 634.133696 -117.916003 51 2255199 CPS LACFCD CRESCENT DRAIN W FOOTHILL BLVD N MCKEEVER AVE SW 0 18 300 14 12 38 50 YES LJ/JR 10/10/2025 12 72 20 11 634.133761 -117.914623 52 2255212 CPS LACFCD BI 9718 GEORGIA AVE W FOOTHILL BLVD NE 2 18 303 6 N/A 39 42 YES LJ/JR 10/10/2025 10 30 12 11 1234.13396 -117.918328 53 2255213 CPS LACFCD BI 9718 GEORGIA AVE W FOOTHILL BLVD NW 2 20 303 3 N/A 47 47 YES LJ/JR 10/10/2025 12 48 16 11 1934.133964 -117.918459 54 2255265 CPS LACFCD FOOTELENO DRAIN FOOTHILL BLVD SUNSET AVE NE 0 18 300 3.5 11 33 44 YES LJ/JR 10/10/2025 8 36 18 11 734.133671 -117.911215 55 2255260 CPS LACFCD FOOTELENO DRAIN FOOTHILL BLVD N. ANGELENO DR NE 0 24 300 3.5 10 41 51 YES LJ/JR 10/10/2025 12 36 20 11 934.133665 -117.909977 56 2255251 CPS LACFCD FOOTELENO DRAIN N. ANGELENO DR W 6TH ST SW 0 20 300 3.5 9 44 53 YES LJ/JR 10/9/2025 12 36 24 11 834.131972 -117.910216 57 2255289 CPS LACFCD FOOTELENO DRAIN W 6TH ST N. ANGELENO DR NW 0 18 300 3.5 9 43 52 YES LJ/JR 10/9/2025 12 36 24 11 7 34.131747 -117.910274 58 2255288 CPS LACFCD FOOTELENO DRAIN N. ANGELENO DR W 6TH ST NE 0 18 300 3.5 8 46 54 YES LJ/JR 10/9/2025 12 36 24 11 1034.1318 -117.910064 59 2255290 CPS LACFCD FOOTELENO DRAIN W 6TH ST N. ANGELENO DR NE 0 20 300 3.5 9 51 60 YES LJ/JR 10/9/2025 12 36 24 11 1534.131741 -117.909986 60 2255242 CPS LACFCD BI 0406 - LINE B W 6TH ST N AZUSA AVE NW 0 20 300 3.5 9 63 72 YES LJ/JR 10/9/2025 12 36 24 11 2734.131726 -117.9077 61 2255282 CPS LACFCD BI 0406 - LINE B W 6TH ST N AZUSA AVE NW 0 16 300 3.5 10 21 31 YES LJ/JR 10/9/2025 8 36 10 11 334.131636 -117.907716 62 2255259 CPS LACFCD BI 0406 - LINE B N AZUSA AVE E 6TH ST NE 0 22 300 21 11 45 56 YES LJ/JR 10/9/2025 12 84 24 11 934.131885 -117.907464 63 2255141 CPS LACFCD BI 0406 - LINE B N ALAMEDA AVE E 6TH ST NW 0 18 300 14 12 30 42 YES LJ/JR 10/9/2025 8 72 18 11 434.13179 -117.906382 64 2255140 CPS LACFCD BI 0406 - LINE B E 6TH ST N ALAMEDA AVE SW 0 18 300 3.5 9 33 42 YES LJ/JR 10/9/2025 8 36 18 11 734.131627 -117.906528 65 2255143 CPS LACFCD BI 0406 - LINE B N DALTON AVE E 6TH ST NW 0 20 300 14 10 34 44 YES LJ/JR 10/8/2025 8 72 18 11 834.131782 -117.905063 66 2255148 CPS LACFCD BI 0406 - LINE B E 6TH ST N DALTON AVE SW 0 18 300 3.5 9 29 38 YES LJ/JR 10/8/2025 8 36 12 11 934.131619 -117.90521 67 2255147 CPS LACFCD BI 0406 - LINE B E 6TH ST N DALTON AVE NW 0 18 300 3.5 10 31 41 YES LJ/JR 10/8/2025 8 36 18 11 534.131716 -117.905173 68 2255145 CPS LACFCD BI 0406 - LINE B N SOLDANO AVE E 6TH ST NW 0 20 300 14 10 35 45 YES LJ/JR 10/8/2025 12 72 20 11 334.131838 -117.903809 69 2255146 CPS LACFCD BI 0406 - LINE B E 6TH ST N SOLDANO AVE SW 0 18 300 3.5 9 26 35 YES LJ/JR 10/8/2025 8 36 12 11 634.131613 -117.903943 70 2298263 CPS LACFCD BI 0406 - LINE B N SOLDANO AVE E 8TH ST NE 4 20 302 14 6 39 45 YES LJ/JR 10/8/2025 10 60 18 11 1134.131793 -117.903639 71 2298115 CPS LACFCD BI 1601 - LINE A N PASADENA AVE E 8TH ST NE 0 16 300 3.5 13 30 43 YES LJ/JR 10/8/2025 8 36 18 11 434.135589 -117.902367 72 2298116 CPS LACFCD BI 1601 - LINE A N PASADENA AVE E 8TH ST NW 0 16 300 7 13 35 48 YES LJ/JR 10/8/2025 12 48 20 11 334.13552 -117.90252 73 2298117 CPS LACFCD BI 1601 - LINE A E 8TH ST N PASADENA AVE NW 0 16 300 3.5 12 28 40 YES LJ/JR 10/8/2025 8 36 18 11 234.135441 -117.902629 74 2298118 CPS LACFCD BI 1601 - LINE A E 8TH ST N PASADENA AVE SW 0 18 300 3.5 12 29 41 YES LJ/JR 10/8/2025 8 36 18 11 334.135347 -117.90265 75 2298126 CPS LACFCD BI 1601 - LINE A N PASADENA AVE E FOOTHILL AVE NW 2 18 301 14 12 26 38 YES LJ/JR 10/8/2025 8 60 10 11 N/A34.133722 -117.902534 76 2298125 CPS LACFCD BI 1601 - LINE A E FOOTHILL AVE N PASADENA AVE NW 0 18 300 3.5 14 28 42 YES LJ/JR 10/8/2025 8 36 18 11 2

34.133632 -117.902649
77 2298122 CPS LACFCD BI 1601 - LINE A E FOOTHILL AVE N PASADENA AVE SW 0 20 300 7 13 34 47 YES LJ/JR 10/8/2025 12 48 20 11 234.133636 -117.902268 78 2298124 CPS LACFCD BI 1603 N PASADENA AVE E FOOTHILL AVE SW 0 16 300 3.5 10 31 41 YES LJ/JR 10/8/2025 8 36 18 11 534.13335 -117.90254 79 2298128 CPS LACFCD BI 1603 E FOOTHILL AVE N PASADENA AVE SE 0 16 300 3.5 12 26 38 YES LJ/JR 10/8/2025 8 36 12 11 634.133417 -117.902278 80 2298132 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E 6TH ST NW 0 24 300 21 10 30 40 YES LJ/JR 10/8/2025 8 84 18 11 434.131935 -117.902556 81 2298134 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E 6TH ST NE 0 24 300 21 12 45 57 YES LJ/JR 10/8/2025 12 84 24 11 934.132108 -117.902394 82 2298145 CPS LACFCD BI 0406 - LINE B E 6TH ST N PASADENA AVE NE 0 18 300 7 9 37 46 YES LJ/JR 10/8/2025 12 48 20 11 534.131608 -117.902683 83 2298146 CPS LACFCD BI 0406 - LINE B E 6TH ST N PASADENA AVE SE 0 16 300 3.5 10 38 48 YES LJ/JR 10/8/2025 12 36 20 11 634.131605 -117.902286 84 2298147 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E 6TH ST SE 0 24 300 21 12 45 57 YES LJ/JR 10/8/2025 12 7 24 11 934.131212 -117.902412 85 2298148 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E 5TH ST NW 0 20 300 7 10 79 89 YES LJ/JR 10/8/2025 12 48 20 11 4734.129965 -117.902565 86 2298149 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E 5TH ST NE 0 16 300 7 12 30 42 YES LJ/JR 10/8/2025 8 48 18 11 434.130036 -117.902415 87 2298150 CPS LACFCD BI 0406 - LINE B E 5TH ST N PASADENA AVE NE 0 20 300 7 10 36 46 YES LJ/JR 10/8/2025 12 48 20 11 434.129882 -117.902244 88 2298151 CPS LACFCD BI 0406 - LINE B E 5TH ST N PASADENA AVE SE 0 18 300 7 9 25 34 YES LJ/JR 10/8/2025 8 48 12 11 534.129794 -117.902244 89 2298152 CPS LACFCD BI 0406 - LINE B E 5TH ST N PASADENA AVE SW 0 16 300 7 9 32 41 YES LJ/JR 10/8/2025 0 48 18 11 1434.129798 -117.90266 90 2298141 CPS LACFCD BI 1650 - LINE B E FOOTHILL AVE ROCKVALE AVE NW 0 32 300 10 10 87 97 YES LJ/JR 10/8/2025 12 72 24 11 5134.133576 -117.896185 91 2298143 CPS LACFCD BI 1650 - LINE B E ALOSTA AVE ROCKVALE AVE NW 0 26 300 28 9 40 49 YES LJ/JR 10/8/2025 12 96 20 11 834.132731 -117.89649 92 2298158 CPS LACFCD BI 1650 - LINE B E 6TH ST ROCKVALE AVE NW 1 2 301 7 10 47 57 YES LJ/JR 10/8/2025 12 48 18 11 1734.131611 -117.896526 93 2298247 CPS LACFCD BI 1264 - UNIT 1 N CITRUS AVE CAMPUS DR NE 0 24 300 7 13 79 92 YES LJ/JR 10/8/2025 12 48 24 11 5334.133693 -117.889988 94 2298267 CPS LACFCD BI 1264 - UNIT 1 N CITRUS AVE CAMPUS DR SE 0 20 300 14 10 37 47 YES LJ/JR 10/8/2025 12 72 20 11 534.132778 -117.889997 95 2298268 CPS LACFCD BI 1264 - UNIT 1 N CITRUS AVE E FOOTHILL BLVD SW 0 18 300 3.5 11 25 36 YES LJ/JR 10/8/2025 8 36 12 11 534.132122 -117.8902 96 2298166 CPS LACFCD BI 1217 S BARRANCA AVE ALOSTA AVE NW 0 16 300 7 10 36 46 YES LJ/JR 10/8/2025 12 48 20 11 434.129 -117.881492 97 2298161 CPS LACFCD BI 1217 N BARRANCA AVE E HOLLYVALE ST NW 0 16 300 3.5 10 22 32 YES LJ/JR 10/8/2025 8 36 10 11 434.127267 -117.881489 98 2298153 CPS LACFCD BI 0406 - LINE B E 4TH ST N PASADENA AVE SW 2 20 302 7 9 33 42 YES LJ/JR 10/8/2025 10 48 12 11 1134.127979 -117.902686 99 2298154 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E 4TH ST NW 0 20 300 7 13 71 84 YES LJ/JR 10/8/2025 12 48 24 11 3534.128153 -117.902579 100 2298155 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E 4TH ST NE 0 20 300 7 12 67 79 YES LJ/JR 10/8/2025 12 48 24 11 3134.128184 -117.902421 101 2298157 CPS LACFCD BI 0406 - LINE B E 4TH ST N PASADENA AVE SE 0 16 300 7 12 19 31 YES LJ/JR 10/8/2025 8 36 8 11 334.127957 -117.902274 102 2299132 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E HOLLYVALE ST NE 0 20 300 3.5 12 51 63 YES LJ/JR 10/8/2025 12 36 24 11 1534.12719 -117.902432 103 2299133 CPS LACFCD BI 0406 - LINE B E HOLLYVALE ST N PASADENA AVE NE 0 16 300 3.5 10 37 47 YES LJ/JR 10/8/2025 12 36 20 11 534.127089 -117.902345 104 2299134 CPS LACFCD BI 0406 - LINE B E HOLLYVALE ST N PASADENA AVE SE 0 18 300 3.5 10 43 53 YES LJ/JR 10/8/2025 12 36 24 11 734.126994 -117.90197 105 2299135 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E HOLLYVALE ST SE 1 16 302 3 13 39 52 YES LJ/JR 10/8/2025 10 32 18 11 1134.126914 -117.902408 106 2299136 CPS LACFCD BI 0406 - LINE B N PASADENA AVE E HOLLYVALE ST NW 0 16 300 3.5 13 31 44 YES LJ/JR 10/8/2025 8 36 18 11 534.127191 -117.902585 107 2299117 CPS LACFCD BI 1219 - LINE D E MAUNA LOA AVE N CITRUS AVE SE 0 16 300 3.5 9 26 35 YES LJ/JR 10/8/2025 8 36 12 11 634.125054 -117.889911 108 2299127 CPS LACFCD BI 1219 - LINE D E MAUNA LOA AVE N CITRUS AVE NE 0 20 300 10 12 32 44 YES LJ/JR 10/8/2025 8 72 18 11 634.125149 -117.889664 109 2299124 CPS LACFCD BI 1219 - LINE D E FACTOR AVE E MAUNA LOA AVE NE 0 16 300 3.5 12 29 41 YES LJ/JR 10/8/2025 8 36 18 11 334.125246 -117.88869 110 2299123 CPS LACFCD BI 1219 - LINE D E MAUNA LOA AVE N FACTOR AVE NE 0 24 300 14 12 34 46 YES LJ/JR 10/8/2025 12 72 20 11 234.125147 -117.888557 111 2299048 CPS LACFCD BI 1219 - LINE D E MAUNA LOA AVE N FAIRVALE DR NE 0 16 300 7 12 35 47 YES LJ/JR 10/8/2025 12 48 20 11 334.125143 -117.886997 112 2255108 CPS LACFCD BI 9718 N VIRGINIA AVE W 5TH ST NW 0 20 300 3.5 10 37 47 YES LJ/JR 10/10/2025 12 36 20 11 534.130052 -117.918011 113 2255109 CPS LACFCD BI 9718 N VIRGINIA AVE W 5TH ST NE 0 18 300 7 10 49 59 YES LJ/JR 10/10/2025 12 48 24 11 1334.130032 -117.917903 114 2255110 CPS LACFCD BI 9718 W 5TH ST N VIRGINIA AVE NE 0 20 300 3.5 10 37 47 YES LJ/JR 10/10/2025 12 36 20 11 534.129966 -117.917819 115 2255111 CPS LACFCD BI 9718 W 5TH ST N VIRGINIA AVE SE 0 20 300 3.5 10 32 42 YES LJ/JR 10/10/2025 8 36 18 11 634.129879 -117.917812 116 2256010 CPS LACFCD BI 1119 W DUELL ST N ORANGE AVE NW 0 18 300 7 10 49 59 YES LJ/JR 10/7/2025 12 48 24 11 13

34.123121 -117.913717
117 2256011 CPS LACFCD BI 1119 W DUELL ST N ORANGE AVE NW 0 18 300 7 10 41 51 YES LJ/JR 10/7/2025 12 48 20 11 934.123025 -117.913795 118 2256012 CPS LACFCD BI 1119 N ORANGE AVE W 1ST ST NW 0 16 300 3.5 12 29 41 YES LJ/JR 10/7/2025 8 36 18 11 334.121804 -117.913669 119 2256014 CPS LACFCD BI 1119 N ORANGE AVE W 1ST ST NE 0 16 300 3.5 13 28 41 YES LJ/JR 10/7/2025 8 36 18 11 234.121804 -117.913546 120 2256015 CPS LACFCD BI 1119 W 1ST ST N ORANGE AVE NW 0 18 300 7 12 38 50 YES LJ/JR 10/7/2025 12 48 20 11 634.121717 -117.913428 121 2256016 CPS LACFCD BI 1119 W 1ST ST N ORANGE AVE SW 0 18 300 3.5 12 46 58 YES LJ/JR 10/7/2025 12 35 24 11 1034.121594 -117.913786 122 2256002 CPS LACFCD GLADSTONE STREET DRAIN S VIRGINIA ST SOLEM ST SW 0 20 300 7 11 38 49 YES LJ/JR 10/6/2025 12 48 20 11 634.118509 -117.918645 123 2256003 CPS LACFCD GLADSTONE STREET DRAIN S VIRGINIA ST W PARAMOUNT ST NW 0 20 300 14 12 33 45 YES LJ/JR 10/6/2025 8 72 18 11 734.118331 -117.918508 124 2256005 CPS LACFCD GLADSTONE STREET DRAIN S VIRGINIA ST SOLEM ST SE 0 20 300 14 12 30 42 YES LJ/JR 10/6/2025 8 72 18 11 434.118445 -117.91851 125 2256004 CPS LACFCD GLADSTONE STREET DRAIN S VIRGINIA ST W PARAMOUNT ST NE 0 18 300 21 13 30 43 YES LJ/JR 10/6/2025 8 84 18 11 434.118224 -117.918518 126 2256001 CPS LACFCD GLADSTONE STREET DRAIN S VIRGINIA ST W PARAMOUNT ST NW 0 20 300 10 13 29 42 YES LJ/JR 10/6/2025 8 72 18 11 334.118278 -117.918645 127 2256071 CPS LACFCD GLADSTONE STREET DRAIN S JACKSON AVE W PARAMOUNT ST SE 0 18 300 14 12 40 52 YES LJ/JR 10/6/2025 12 72 24 11 434.117878 -117.920685 128 2256072 CPS LACFCD GLADSTONE STREET DRAIN S JACKSON AVE E GLADSTONE ST SW 0 24 300 14 11 55 66 YES LJ/JR 10/7/2025 12 72 24 6 - 11 1934.115606 -117.920806 129 2256074 CPS LACFCD GLADSTONE STREET DRAIN S JACKSON AVE E GLADSTONE ST NE 0 18 300 21 12 50 62 YES LJ/JR 10/7/2025 12 84 24 11 1434.114556 -117.92071 130 2256073 CPS LACFCD GLADSTONE STREET DRAIN S JACKSON AVE E GLADSTONE ST NW 0 18 300 3.5 13 26 39 YES LJ/JR 10/7/2025 8 36 12 11 634.114529 -117.920835 131 2256075 CPS LACFCD GLADSTONE STREET DRAIN E GLADSTONE ST S JACKSON ST NW 2 301 10 11 47 58 YES LJ/JR 10/7/2025 12 60 18 11 1734.114411 -117.920968 132 2256166 CPS LACFCD GLADSTONE STREET DRAIN S ASPAN AVE E GLADSTONE ST NE 0 24 300 14 13 42 55 YES LJ/JR 10/7/2025 12 72 24 11 634.11454 -117.91926 133 2256167 CPS LACFCD GLADSTONE STREET DRAIN E GLADSTONE ST S ASPAN AVE NE 0 20 300 7 11 34 45 YES LJ/JR 10/7/2025 8 48 18 11 834.114408 -117.918794 134 2256168 CPS LACFCD GLADSTONE STREET DRAIN S VIRGINIA ST E GLADSTONE ST NW 0 20 300 7 13 35 48 YES LJ/JR 10/7/2025 12 48 20 2 - 11 334.11452 -117.917922 135 2256169 CPS LACFCD GLADSTONE STREET DRAIN S VIRGINIA ST E GLADSTONE ST NW 0 18 300 7 12 44 56 YES LJ/JR 10/7/2025 12 48 24 11 834.114636 -117.917919 136 2256006 CPS LACFCD BI 1119 S LEMON ST W PARAMOUNT ST NW 0 16 300 7 13 18 31 YES LJ/JR 10/6/2025 12 48 20 11 634.118205 -117.914075 137 2256007 CPS LACFCD BI 1119 S LEMON ST W PARAMOUNT ST NE 0 20 300 7 13 41 54 YES LJ/JR 10/6/2025 12 48 24 11 434.118392 -117.913959 138 2256008 CPS LACFCD BI 1119 W PARAMOUNT ST S ENID AVE NE 0 16 300 3.5 13 23 36 YES LJ/JR 10/6/2025 8 36 12 11 334.118091 -117.913656 139 2256009 CPS LACFCD BI 1119 W PARAMOUNT ST S ENID AVE SE 0 16 300 3.5 14 28 42 YES LJ/JR 10/6/2025 8 36 18 8 - 11 234.11796 -117.913481 140 2256182 CPS LACFCD BI 1119 S ENID ST W GRANDVIEW DR NW 0 18 300 3.5 13 39 52 YES LJ/JR 10/6/2025 12 36 24 11 534.116311 -117.913746 141 2256183 CPS LACFCD BI 1119 S ENID ST W GRANDVIEW DR NE 0 16 300 3.5 13 24 37 YES LJ/JR 10/6/2025 8 36 12 11 434.116372 -117.91364 142 2256184 CPS LACFCD BI 1119 W GRANDVIEW DR S ENID AVE NE 0 16 300 3.5 13 40 53 YES LJ/JR 10/6/2025 12 36 24 11 434.116257 -117.913505 143 2256185 CPS LACFCD BI 1119 W GRANDVIEW DR S ENID AVE SE 0 18 300 3.5 12 54 66 YES LJ/JR 10/6/2025 12 36 24 7 - 11 1834.116166 -117.913507 144 2256179 CPS LACFCD BI 1119 S ENID ST W GLADSTONE ST NE 0 16 300 3.5 13 35 48 YES LJ/JR 10/6/2025 12 36 20 11 334.114647 -117.913655 145 2256017 CPS LACFCD ANGELENO AVENUE DRAIN S ANGELENO AVE W PARAMOUNT ST NW 0 18 300 21 10 43 53 YES LJ/JR 10/6/2025 12 84 24 11 734.118211 -117.91029 146 2256019 CPS LACFCD ANGELENO AVENUE DRAIN W PARAMOUNT ST S ANGELENO AVE NE 0 20 300 3.5 10 40 50 YES LJ/JR 10/6/2025 12 36 20 11 834.118072 -117.910034 147 2256020 CPS LACFCD ANGELENO AVENUE DRAIN W PARAMOUNT ST S ANGELENO AVE SE 0 24 300 3.5 10 56 66 YES LJ/JR 10/6/2025 12 36 24 11 2034.117943 -117.910031 148 2256021 CPS LACFCD ANGELENO AVENUE DRAIN W SAN GABRIEL PL W PARAMOUNT ST NW 0 20 300 10 10 42 52 YES LJ/JR 10/6/2025 12 72 24 11 634.118167 -117.90901 149 2256022 CPS LACFCD ANGELENO AVENUE DRAIN W SAN GABRIEL PL W PARAMOUNT ST NW 0 24 300 14 10 39 49 YES LJ/JR 10/6/2025 12 72 20 11 734.118368 -117.909005 150 2256023 CPS LACFCD ANGELENO AVENUE DRAIN W SAN GABRIEL PL W PARAMOUNT ST NE 0 20 300 21 10 27 37 YES LJ/JR 10/6/2025 8 84 14 11 534.118169 -117.908893 151 2256024 CPS LACFCD ANGELENO AVENUE DRAIN W SAN GABRIEL PL W PARAMOUNT ST NE 0 18 300 21 10 28 38 YES LJ/JR 10/6/2025 8 84 14 11 634.118273 -117.908894 152 2256025 CPS LACFCD ANGELENO AVENUE DRAIN W PARAMOUNT ST S SAN GABRIEL PL NE 0 20 300 3.5 9 59 68 YES LJ/JR 10/6/2025 12 36 24 11 2334.118065 -117.908717 153 2256189 CPS LACFCD ANGELENO AVENUE DRAIN GRANDVIEW DR S SAN ANGELENO AVE SE 0 24 300 10 9 48 57 YES LJ/JR 10/6/2025 12 72 24 11 1234.116141 -117.909267 154 2256296 CPS LACFCD LITTLE DALTON WASH N SOLDANO AVE W 2ND ST SW 0 24 300 7 10 86 96 YES LJ/JR 10/7/2025 12 48 24 11 5034.12193 -117.903876 155 2299138 CPS LACFCD BI 0406 - LINE A E 1ST ST N PASADENA AVE NW 0 18 300 14 17 27 44 YES LJ/JR 10/7/2025 8 72 18 11 134.121662 -117.90232 156 2299139 CPS LACFCD BI 0406 - LINE A E 1ST ST N PASADENA AVE SE 0 16 300 7 12 31 43 YES LJ/JR 10/7/2025 8 48 18 11 5

34.121534 -117.902327
157 2299141 CPS LACFCD BI 0406 - LINE A N RODECKER DR E 1ST ST SE 0 16 300 7 12 36 48 YES LJ/JR 10/7/2025 12 48 24 11 034.121773 -117.900452 158 2299146 CPS LACFCD BI 0406 - LINE A E BASELINE RD N CERRITOS AVE NE 0 18 300 7 12 30 42 YES LJ/JR 10/7/2025 8 48 18 11 434.121661 -117.899184 159 2299147 CPS LACFCD BI 0406 - LINE A E BASELINE RD N CERRITOS AVE SE 0 16 300 3.5 13 22 35 YES LJ/JR 10/7/2025 8 36 12 11 234.121512 -117.899173 160 2299093 CPS LACFCD BI 0406 - LINE A ROCKVALE AVE E BASELINE RD NE 0 24 300 7 12 43 55 YES LJ/JR 10/7/2025 12 48 24 11 734.121919 -117.896258 161 2299094 CPS LACFCD BI 0406 - LINE A ROCKVALE AVE E BASELINE RD NE 0 24 300 14 12 61 73 YES LJ/JR 10/7/2025 12 72 24 11 2534.121864 -117.896259 162 2299095 CPS LACFCD BI 0406 - LINE A E BASELINE RD ROCKVALE AVE NE 0 18 300 7 12 44 56 YES LJ/JR 10/7/2025 12 48 24 11 834.121639 -117.896112 163 2299096 CPS LACFCD BI 0406 - LINE A E BASELINE RD ROCKVALE AVE SE 0 16 300 7 13 27 40 YES LJ/JR 10/7/2025 8 48 18 11 134.121493 -117.895928 164 2299097 CPS LACFCD BI 0406 - LINE A E BASELINE RD ROCKVALE AVE SE 6 24 302 21 9 43 52 YES LJ/JR 10/7/2025 10 60 18 11 1534.121468 -117.894601 165 2299098 CPS LACFCD BI 0406 - LINE A E 1ST ST N FERIMORE AVE NW 0 20 300 14 13 33 46 YES LJ/JR 10/7/2025 12 72 20 11 134.121724 -117.894382 166 2299099 CPS LACFCD BI 0406 - LINE A E BASELINE RD ROCKVALE AVE NW 0 24 300 14 12 78 90 YES LJ/JR 10/7/2025 12 72 24 11 4234.121615 -117.894403 167 2299100 CPS LACFCD BI 12190 - LINE D N FENIMORE AVE E 1ST ST NW 0 24 300 14 10 34 44 YES LJ/JR 10/7/2025 8 72 18 11 834.12188 -117.893357 168 2299101 CPS LACFCD BI 12190 - LINE D N FENIMORE AVE E 1ST ST NW 0 24 300 14 10 31 41 YES LJ/JR 10/7/2025 8 72 18 11 534.121991 -117.893358 169 2299102 CPS LACFCD BI 12190 - LINE D N FENIMORE AVE E 1ST ST NE 0 20 300 7 11 52 63 YES LJ/JR 10/7/2025 12 48 24 11 1634.121905 -117.893223 170 2299103 CPS LACFCD BI 12190 - LINE D N FENIMORE AVE E 1ST ST NE 0 24 300 7 12 60 72 YES LJ/JR 10/7/2025 12 48 24 11 2434.121801 -117.893229 171 2299104 CPS LACFCD BI 12190 - LINE D E BASELINE RD N FENIMORE AVE SE 0 16 300 7 10 38 48 YES LJ/JR 10/7/2025 12 48 24 11 234.121599 -117.893155 172 2299105 CPS LACFCD BI 12190 - LINE D E 1ST ST N FENIMORE AVE NE 0 16 300 7 10 26 36 YES LJ/JR 10/7/2025 8 48 12 11 634.121703 -117.893138 173 2299106 CPS LACFCD BI 12190 - LINE D E BASELINE RD N FENIMORE AVE SE 0 16 300 3.5 9 32 41 YES LJ/JR 10/7/2025 8 36 18 11 634.121401 -117.892599 174 2299107 CPS LACFCD BI 12190 - LINE D E BASELINE RD N FENIMORE AVE SE 1 24 302 3 9 51 60 YES LJ/JR 10/7/2025 10 32 18 11 2334.121565 -117.891739 175 2299110 CPS LACFCD BI 12190 - LINE D E BASELINE RD N CITRUS AVE SE 0 20 300 7 10 40 50 YES LJ/JR 10/8/2025 12 48 20 11 834.121358, -117.889923 176 2299111 CPS LACFCD BI 12190 - LINE D E BASELINE RD N CITRUS AVE NW 0 16 300 7 10 37 47 YES LJ/JR 10/8/2025 12 48 20 11 534.12177 -117.890287 177 2299070 CPS LACFCD BI 1219 LINE C E ARMSTEAD ST S CITRUS AVE SE 0 18 300 3.5 12 34 46 YES LJ/JR 10/6/2025 12 36 20 11 234.118248 -117.889937 178 2299073 CPS LACFCD BI 1219 LINE C E ARMSTEAD ST S CITRUS AVE NE 0 16 300 3.5 12 29 41 YES LJ/JR 10/6/2025 8 36 12 11 934.118339 -117.889934 179 2299075 CPS LACFCD BI 1219 LINE C S RANBURN AVE E ARMSTEAD ST NW 0 24 300 10 9 41 50 YES LJ/JR 10/6/2025 12 72 20 11 934.118533 -117.889697 180 2299076 CPS LACFCD BI 1219 LINE C S RANBURN AVE E ARMSTEAD ST NE 0 24 300 10 10 37 47 YES LJ/JR 10/6/2025 12 72 20 11 534.118544 -117.889586 181 2299077 CPS LACFCD BI 1219 LINE C S RANBURN AVE E ARMSTEAD ST NE 0 20 300 10 8 39 47 YES LJ/JR 10/6/2025 12 72 20 11 734.118431 -117.889586 182 2299078 CPS LACFCD BI 1219 LINE C E ARMSTEAD ST S RANBURN AVE NE 0 16 300 7 12 34 46 YES LJ/JR 110/6/25 12 48 20 11 234.118339 -117.889463 183 2299079 CPS LACFCD BI 1219 LINE C E ARMSTEAD ST S RANBURN AVE SE 0 16 300 3.5 12 32 44 YES LJ/JR 10/6/2025 8 36 18 11 634.118246 -117.888741 184 2299002 CPS LACFCD BI 1219 LINE C E ARMSTEAD ST S FAIRVALE AVE SE 0 24 300 14 12 35 47 YES LJ/JR 10/6/2025 12 72 20 11 334.11824 -117.886936 185 2299003 CPS LACFCD BI 1219 LINE C E ARMSTEAD ST S FAIRVALE AVE NE 0 16 300 7 12 32 44 YES LJ/JR 10/6/2025 8 48 18 11 634.118333 -117.887049 186 2299004 CPS LACFCD BI 1219 LINE C E ARMSTEAD ST S FAIRVALE AVE NE 0 24 300 14 11 36 47 YES LJ/JR 10/6/2025 12 72 20 11 4

34.118335 -117.886938
187 2299207 CPS LACFCD BI 1219 LINE C E NEARFIELD ST S CITRUS AVE SE 0 18 300 21 12 44 56 YES LJ/JR 10/6/2025 12 84 24 11 834.116637 -117.889721 188 2299208 CPS LACFCD BI 1219 LINE C E NEARFIELD ST S CITRUS AVE NE 0 18 300 14 12 39 51 YES LJ/JR 10/6/2025 12 72 20 11 734.116737 -117.889955 189 2299201 CPS LACFCD BI 1219 LINE C E GLADSTONE ST S CITRUS AVE SE 0 24 300 28 11 54 65 YES LJ/JR 10/6/2025 12 96 24 11 1834.114034 -117.889872 190 2299199 CPS LACFCD BI 1219 LINE C S CITRUS AVE E GLADSTONE ST SE 0 24 300 21 13 81 94 YES LJ/JR 10/6/2025 12 84 24 11 4534.112738 -117.890145 191 2256273 CPS LACFCD ARROWDALE DRAIN S IRWINDALE AVE W 1ST ST SW 0 20 300 7 10 48 58 YES LJ/JR 10/7/2025 12 48 24 11 1234.120852 -117.934 192 2256061 CPS LACFCD RDD 0217 S IRWINDALE AVE W MCKINLEY AVE NW 0 24 300 7 10 58 68 YES LJ/JR 10/7/2025 12 48 24 11 2234.119802 -117.934009 193 2256064 CPS LACFCD ARROWDALE DRAIN S IRWINDALE AVE W MCKINLEY AVE NE 0 24 300 14 10 57 67 YES LJ/JR 10/7/2025 12 72 24 11 2134.119786 -117.93363 194 2256066 CPS LACFCD ARROWDALE DRAIN S IRWINDALE AVE W PARAMOUNT ST NE 0 24 300 7 10 71 81 YES LJ/JR 10/7/2025 12 48 24 11 3534.118919 -117.933789 195 2256067 CPS LACFCD RDD 0217 S IRWINDALE AVE W PARAMOUNT ST NW 0 18 300 7 10 62 72 YES LJ/JR 10/7/2025 12 48 24 11 2634.118048 -117.934 196 2256068 CPS LACFCD RDD 0217 S IRWINDALE AVE W PARAMOUNT ST NE 1 18 301 14 10 37 47 YES LJ/JR 10/7/2025 12 48 15 11 10

34.118097 -117.933806
197 2256069 CPS LACFCD RDD 0217 S IRWINDALE AVE W PARAMOUNT ST SE 0 18 300 10 12 32 44 YES LJ/JR 10/7/2025 8 72 18 11 934.117898 -117.933646 198 2256086 CPS LACFCD RDD 0217 S IRWINDALE AVE W ROOSEVELT ST NE 1 18 301 14 10 36 46 YES LJ/JR 10/7/2025 12 48 15 11 934.116245 -117.93384 199 2256095 CPS LACFCD RDD 0217 S IRWINDALE AVE W GLADSTONE ST NE 0 18 300 21 10 26 36 YES LJ/JR 10/7/2025 8 84 14 11 434.11515 -117.93379 200 2256093 CPS LACFCD ARROWDALE DRAIN S IRWINDALE AVE W GLADSTONE ST SW 0 18 300 3.5 11 33 44 YES LJ/JR 10/7/2025 8 36 18 11 734.11486 -117.93408 201 2256092 CPS LACFCD BI 9736 S IRWINDALE AVE W GLADSTONE ST SW 0 18 300 3.5 10 53 63 YES LJ/JR 10/7/2025 12 36 24 11 1734.11481 -117.93407 202 2256094 CPS LACFCD BI 9736 S IRWINDALE AVE W GLADSTONE ST NE 0 24 300 7 10 31 41 YES LJ/JR 10/7/2025 8 48 18 11 5

34.114739 -117.933825
203 2256090 CPS LACFCD BI 9736 S IRWINDALE AVE W GLADSTONE ST NE 0 20 300 7 11 40 51 YES LJ/JR 10/7/2025 12 48 20 11 834.114547 -117.933827 204 2256091 CPS LACFCD ARROWDALE DRAIN S IRWINDALE AVE W GLADSTONE ST NE 0 24 300 14 10 72 82 YES LJ/JR 10/7/2025 12 72 24 11 3634.114454 -117.933642 205 2256077 CPS LACFCD ARROWDALE DRAIN W GLADSTONE ST S DUGGAN AVE NE 0 18 300 3.5 11 32 43 YES LJ/JR 10/7/2025 8 36 18 11 634.114402 -117.928352 206 2256254 CPS LACFCD ARROWDALE DRAIN W GLADSTONE ST S DUGGAN AVE S/W 0 20 300 10 10 46 56 YES LJ/JR 10/7/2025 12 72 24 11 10

34.114241 -117.92815
207 2256076 CPS LACFCD ARROWDALE DRAIN W GLADSTONE ST S DUGGAN AVE SW 0 18 300 10 12 41 53 YES LJ/JR 10/7/2025 12 72 24 11 534.11423 -117.926455 208 2256137 CPS LACFCD BI 1228 - LINE B S VINCENT AVE E NEWBAUGH St NE 0 24 300 21 11 58 69 YES LJ/JR 10/6/2025 12 84 24 11 1234.110965 -117.925218 209 2256136 CPS LACFCD BI 1228 - LINE B S VINCENT AVE E NEWBAUGH St NE 0 20 300 21 10 33 43 YES LJ/JR 10/6/2025 10 84 16 11 734.110773 -117.925224 210 2256135 CPS LACFCD BI 1228 - LINE B S VINCENT AVE E NEWBAUGH St NE 2 24 302 7 9 44 53 YES LJ/JR 10/6/2025 10 48 18 2 - 11 1634.110636 -117.925118 211 2256134 CPS LACFCD BI 1228 - LINE B S VINCENT AVE E NEWBAUGH St SE 0 20 300 10 9 34 43 YES LJ/JR 10/6/2025 8 72 18 11 834.110538 -117.925056 212 2256138 CPS LACFCD BI 1228 - LINE B S VINCENT AVE E NEWBAUGH St SW 0 20 300 21 10 39 49 YES LJ/JR 10/6/2025 12 84 20 11 734.110614 -117.925393 213 2256121 CPS LACFCD BI 1228 - LINE B ARROW HWY S VINCENT AVE NE 0 18 300 7 10 36 46 YES LJ/JR 10/6/2025 12 48 20 11 434.10723 -117.925295 214 2256122 CPS LACFCD BI 1228 - LINE A ARROW HWY S VINCENT AVE NE 0 18 300 21 10 39 49 YES LJ/JR 10/6/2025 12 84 20 2 - 11 7

34.107093 -117.925037
215 2256125 CPS LACFCD BI 1228 - LINE A ARROW HWY N BURWOOD AVE NW 0 16 300 14 10 59 69 YES LJ/JR 10/6/2025 12 72 24 11 2334.107082 -117.923157 216 2256126 CPS LACFCD BI 1228 - LINE A ARROW HWY N BURWOOD AVE NE 0 18 300 21 12 62 74 YES LJ/JR 10/6/2025 12 84 24 11 26

34.107102 -117.921966
217 2256289 CPS LACFCD VALLEYDALE SCHOOL DRAIN E ARROW HWY E WOODCROFT ST NE 0 18 300 10 10 58 68 YES LJ/JR 10/6/2025 12 72 24 11 2234.108505 -117.916466 218 2299182 CPS LACFCD BI 1219 - LINE E N CERRITOS AVE E WOODCROFT ST NE 0 18 300 7 9 41 50 YES LJ/JR 10/6/2025 12 48 20 11 9

34.108927 -117.898904
219 2299181 CPS LACFCD BI 1219 - LINE E N CERRITOS AVE E NEWBURGH ST NE 0 24 300 14 10 43 53 YES L/JR 10/6/2025 12 72 24 11 7

34.110256 -117.898886
220 2299180 CPS LACFCD BI 1219 - LINE E N CERRITOS AVE E NEWBURGH ST NW 0 18 300 14 11 37 48 YES LJ/JR 10/6/2025 12 72 20 11 534.11032 -117.89908 221 2299178 CPS LACFCD BI 1219 - LINE E N CERRITOS AVE E NEWBURGH ST SW 0 18 300 7 11 29 40 YES LJ/JR 10/6/2025 8 48 18 11 3

34.111627 -117.899096
222 2299176 CPS LACFCD BI 1219 - LINE E N CERRITOS AVE E GLADSTONE ST SW 0 20 300 7 10 43 53 YES LJ/JR 10/6/2025 12 48 24 11 734.112722 -117.899072 223 2299189 CPS LACFCD BI 1265 - LINE D W ARROW HWY N CITRUS AVE NE 0 18 300 3.5 9 24 33 YES LJ/JR 10/6/2025 8 36 12 11 434.107101 -117.89019 224 2255024 CPS LACFCD BI 1650 - LINE A N SUNSET AVE W BANCROFT ST NE 0 20 300 7 12 49 61 YES LJ/JR 10/10/2025 12 48 24 11 1334.148299 -117.911291 225 2254023 CPS LACFCD BI 1650 - LINE A W BANCROFT ST N SUNSET AVE NE 0 22 300 7 11 37 48 YES LJ/JR 10/10/2025 12 28 20 11 534.148124 -117.911141 226 2254026 CPS LACFCD BI 1650 - LINE A N SUNSET AVE W BANCROFT ST SW 0 18 300 14 12 51 63 YES LJ/JR 10/10/2025 12 72 24 11 1534.148063 -117.911387 227 2254022 CPS LACFCD BI 1650 - LINE A W BANCROFT ST N SUNSET AVE SE 0 24 300 7 11 41 52 YES LJ/JR 10/10/2025 12 48 24 11 434.148062 -117.91123 228 2255073 CPS LACFCD BI 1650 - LINE A SIERRA MADRE AVE N SUNSET AVE NE 0 18 300 7 13 35 48 YES LJ/JR 10/10/2025 12 48 20 11 334.146754 -117.911085 229 2254021 CPS LACFCD MTD 0003 N HILLTOP DR E VIEWCREST DR NW 4 20 302 14 12 61 73 YES LJ/JR 10/10/2025 10 60 18 11 3334.148743 -117.906337 230 2254020 CPS LACFCD MTD 0003 N HILLTOP DR E VIEWCREST DR NE 2 20 302 7 12 69 81 YES LJ/JR 10/10/2025 10 48 18 11 5134.148781 -117.906398 Azusa: County Location List - Citywide Full Trash Capture Device No.

Device To
Be
Installed

LACFCD CB
ID
Ownership Drain Name Street Nearest Cross Street Side of Street
Number
of Grates
Outlet
Pipe
Diameter
(in)
CB Type
(SPPWC
Std.)
CB
Width"W
"
(ft)
Curb
Face
Height
"X"
V Depth
(in)
CPS
Inspections Tech Date Comments Latitude Longitude
1 CPS 2255065 LACFCD BEATTY CANYON STORM DRAIN E Sierra Madre Ave N Hilltop Dr S/S 0 18 300 3.5 0 36 YES RC 4/6/2026 34.146646 -117.907208 2 CPS 2255068 LACFCD BEATTY CANYON STORM DRAIN E Sierra Madre Ave N Hilltop Dr N/E/C 0 18 300 28 10 36 YES RC 4/6/2026 34.146832 -117.907020 3 CPS 2255064 LACFCD BEATTY CANYON STORM DRAIN E Sierra Madre Ave N Alameda Ave S/E/S 0 18 300 14 10 77 YES RC 4/6/2026 34.146664 -117.906386 4 CPS 2255063 LACFCD BEATTY CANYON STORM DRAIN E Sierra Madre Ave N Dalton Ave S/E/C 0 20 300 15 10 90 YES RC 4/6/2026 34.146686 -117.904995 5 CPS 2255060 LACFCD BEATTY CANYON STORM DRAIN E Sierra Madre Ave N Nob Hill Dr N/E/C 0 18 300 7 10 51 YES RC 4/6/2026 34.146866 -117.904273 6 CPS 2255019 LACFCD BI 1601 - LINE A W 11th St N Orange Ave S/E/S 0 15 300 14 10 45 YES RC 4/6/2026 34.140942 -117.912889 7 CPS 2255020 LACFCD BI 1601 - LINE A W 11th St N Orange Ave S/W/S 0 22 300 21 11 44 YES RC 4/6/2026 34.140835 -117.912795 8 CPS 2255022 LACFCD BI 1601 - LINE A W 11th St N Orange Ave N/W/S 0 18 300 3.5 13 49 YES RC 4/6/2026 34.141172 -117.912551 9 CPS 2255024 LACFCD BI 1601 - LINE A W 11th St N Orange Ave N/E/S 0 18 300 3.5 13 44 YES RC 4/6/2026 34.141197 -117.912417 10 CPS 2255025 LACFCD BI 1601 - LINE A W 11th St N Orange Ave N/E/S 0 16 300 3.5 11 37 YES RC 4/6/2026 34.140945 -117.912323 11 CPS 2255026 LACFCD BI 1601 - LINE A W 11th St N Orange Ave S/E/S 0 16 300 3.5 10 56 YES RC 4/6/2026 34.140818 -117.912205 12 CPS 2255028 LACFCD BI 1601 - LINE A W 11th St N Sunset Ave N/W/S 0 18 300 3.5 12 38 YES RC 4/6/2026 34.141175 -117.911429 13 CPS 2255029 LACFCD BI 1601 - LINE A W 11th St N Sunset Ave N/E/S 0 18 300 3.5 121 38 YES RC 4/6/2026 34.141112 -117.911318 14 CPS 2255031 LACFCD BI 1601 - LINE A W 11th St N Sunset Ave N/E/S 0 16 300 7 10 44 YES RC 4/6/2026 34.140931 -117.911139 15 CPS 2255032 LACFCD BI 1601 - LINE A W 11th St N Sunset Ave S/E/C 0 16 300 3.5 12 40 YES RC 4/6/2026 34.140825 -117.911138 16 CPS 2255034 LACFCD BI 1601 - LINE A W 11th St N Angeleno Ave N/W/S 0 18 300 3.5 10.5 45 YES RC 4/6/2026 34.141074 -117.910180 17 CPS 2255033 LACFCD BI 1601 - LINE A W 11th St N Angeleno Ave N/E/S 0 18 300 11 13.5 46 YES RC 4/6/2026 34.141090 -117.910071 18 CPS 2255035 LACFCD BI 1601 - LINE A W 11th St N Angeleno Ave N/E/S 0 18 300 7 9 58 YES RC 4/6/2026 34.140943 -117.909878 19 CPS 2255036 LACFCD BI 1601 - LINE A W 11th St N Angeleno Ave S/E/S 0 18 300 3.5 10 40 YES RC 4/6/2026 34.140832 -117.909857 20 CPS 2255054 LACFCD BI 1601 - LINE A W 11th St N San Gabriel Ave N/W/C 0 18 300 3.5 9.5 48 YES RC 4/6/2026 34.140924 -117.909016 21 CPS 2255057 LACFCD BI 1601 - LINE A W 11th St N Azusa Ave S/W/C 0 18 300 7 10 47 YES RC 4/6/2026 34.140936 -117.907682 22 CPS 2255040 LACFCD BI 1601 - LINE A W 11th St N Azusa Ave S/W/C 0 16 300 3.5 11 40 YES RC 4/6/2026 34.140821 -117.907696 23 CPS 2255059 LACFCD BI 1601 - LINE A W 11th St N Azusa Ave N/W/S 0 16 300 3.5 14 39 YES RC 4/6/2026 34.141115 -117.907587 24 CPS 2255053 LACFCD BI 1601 - LINE A W 11th St N Azusa Ave N/E/S 0 26 300 14 12 47 YES RC 4/6/2026 34.141038 -117.907392 25 CPS 2255051 LACFCD BI 1601 - LINE A W 11th St N Alameda Ave N/W/S 0 18 300 3.5 11 39 YES RC 4/6/2026 34.140902 -117.906531 26 CPS 2255039 LACFCD BI 1601 - LINE A W 11th St N Alameda Ave S/W/S 0 16 300 3.5 11 41 YES RC 4/6/2026 34.140811 -117.906405 27 CPS 2255050 LACFCD BI 1601 - LINE A W 11th St N Alameda Ave N/W/C 0 18 300 14 14 49 YES RC 4/6/2026 34.140974 -117.906367 28 CPS 2255048 LACFCD BI 1601 - LINE A W 11th St N Dalton Ave N/W/S 0 18 300 3.5 11 41 YES RC 4/6/2026 34.140908 -117.905494 29 CPS 2255047 LACFCD BI 1601 - LINE A W 11th St N Dalton Ave N/W/C 0 18 300 10 12 49 YES RC 4/6/2026 34.140981 -117.905356 30 CPS 2255045 LACFCD BI 1601 - LINE A W 11th St N Dalton Ave N/E 0 18 300 10 12 46 YES RC 4/6/2026 34.141176 -117.905223 31 CPS 2255038 LACFCD BI 1601 - LINE A W 11th St N Dalton Ave S/E/S 0 16 300 3.5 10.5 36 YES RC 4/6/2026 34.140798 -117.905099 32 CPS 2255044 LACFCD BI 1601 - LINE A W 11th St N Holmar Ave N/W/C 0 16 300 3.5 11 31 YES RC 4/6/2026 34.140909 -117.904549 33 CPS 2255043 LACFCD BI 1601 - LINE A W 11th St N Holmar Ave N/W/S 0 16 300 3.5 11.5 25 YES RC 4/6/2026 34.140996 -117.904446 34 CPS 2255041 LACFCD BI 1601 - LINE A W 11th St N Holmar Ave N/E/S 0 16 300 3.5 12 39 YES RC 4/6/2026 34.141099 -117.904305

CITY OF AZUSA
Field Data
EXHIBIT A: CITY PROVIDES THE FOLLOWING INFORMATION
http://dpw.lacounty.gov/fcd/stormdrain/disclaimer.cfm
35 CPS 2255037 LACFCD BI 1601 - LINE A W 11th St N Soldano Ave S/W/C 0 18 300 3.5 10.5 39 YES RC 4/6/2026 34.140796 -117.903819 36 CPS 2298084 LACFCD BI 1601 - LINE A W 11th St N Pasadena Ave N/W/S 2 16 301 7 12 99 YES RC 4/6/2026 34.140896 -117.902599 37 CPS 2298085 LACFCD BI 1601 - LINE A W 11th St N Pasadena Ave S/E/S 0 16 300 4 11 47 YES RC 4/6/2026 34.140791 -117.902628 38 CPS 2298086 LACFCD BI 1601 - LINE A W 11th St N Pasadena Ave N/W/S 0 24 300 28 10 38 YES RC 4/6/2026 34.140958 -117.902478 39 CPS 2298087 LACFCD BI 1601 - LINE A W 11th St N Pasadena Ave N/W 0 24 300 21 10 53 YES RC 4/6/2026 34.141117 -117.902478 40 CPS 2298089 LACFCD BI 1601 - LINE A W 11th St N Pasadena Ave N/E 0 24 300 21 10.5 52 YES RC 4/6/2026 34.141144 -117.902317 41 CPS 2298088 LACFCD BI 1601 - LINE A W 11th St N Pasadena Ave N/E/S 0 24 300 28 10 60 YES RC 4/6/2026 34.140998 -117.902336 42 CPS 2298090 LACFCD BI 1601 - LINE A W 11th St N Pasadena Ave N/E/C 0 18 300 3.5 11 48 YES RC 4/6/2026 34.140895 -117.902240 43 CPS 2298091 LACFCD BI 1601 - LINE B W 10th St N Pasadena Ave S/W/S 0 18 300 3.5 12 33 YES RC 4/7/2026 34.138969 -117.902609 44 CPS 2298092 LACFCD BI 1601 - LINE B W 10th St N Pasadena Ave N/W/S 0 18 300 7 11 42 YES RC 4/7/2026 34.139077 -117.902660 45 CPS 2298093 LACFCD BI 1601 - LINE B W 10th St N Pasadena Ave N/W/C 0 18 300 21 11 42 YES RC 4/7/2026 34.139140 -117.902491 46 CPS 2298094 LACFCD BI 1601 - LINE B W 10th St N Pasadena Ave N/E/C 0 16 300 3.5 14 41 YES RC 4/7/2026 34.139158 -117.902321 47 CPS 2298095 LACFCD BI 1601 - LINE B W 10th St N Pasadena Ave N/E/S 0 18 300 3.5 12.5 55 YES RC 4/7/2026 34.139079 -117.902182 48 CPS 2298096 LACFCD BI 1601 - LINE B W 10th St N Pasadena Ave S/E/C 0 28 300 28 13 56 YES RC 4/7/2026 34.138945 -117.902199 49 CPS 2298098 LACFCD BI 1601 - LINE B W 10th St N Old Mill Rd N/W/C 0 24 300 14 13 56 YES RC 4/6/2026 34.139141 -117.901462 50 CPS 2298100 LACFCD BI 1601 - LINE B W 10th St N Old Mill Rd N/W 0 24 300 14.5 13 52 YES RC 4/6/2026 34.139273 -117.901458 51 CPS 2298099 LACFCD BI 1601 - LINE B W 10th St N Old Mill Rd N/E/C 0 18 300 4 14 48 YES RC 4/6/2026 34.139133 -117.901331 52 CPS 2298101 LACFCD BI 1601 - LINE B W 10th St N Old Mill Rd N 0 24 300 14 12 48 YES RC 4/6/2026 34.139313 -117.901340 53 CPS 2298102 LACFCD BI 1601 - LINE B W 10th St N Old Mill Rd N/E/S 0 16 300 7 12 56 YES RC 4/7/2026 34.139066 -117.901213 54 CPS 2298103 LACFCD BI 1601 - LINE B W 10th St N Old Mill Rd S/E/S 0 24 300 14 12 46 YES RC 4/7/2026 34.138970 -117.901186 55 CPS 2255006 LACFCD CRESCENT DRAIN Crescent Dr N McKeever Ave N/W/C 0 18 300 7 10 51 YES PDL 4/6/2026 34.138034 -117.915249 56 CPS 2255007 LACFCD CRESCENT DRAIN Crescent Dr N McKeever Ave N/W/C 0 20 300 24 12 49 YES PDL 4/6/2026 34.138082 -117.915081 57 CPS 2255008 LACFCD CRESCENT DRAIN Crescent Dr N McKeever Ave N/E 0 18 300 21 12 67 YES PDL 4/6/2026 34.138178 -117.914956 58 CPS 2255009 LACFCD CRESCENT DRAIN Crescent Dr N Enid Ave N/W/C 0 18 300 10 11 44 YES PDL 4/6/2026 34.137791 -117.914010 59 CPS 2255010 LACFCD CRESCENT DRAIN Crescent Dr N Enid Ave N/W/C 0 18 300 14 11 43 YES PDL 4/6/2026 34.137842 -117.913873 60 CPS 2255012 LACFCD CRESCENT DRAIN Crescent Dr N Enid Ave N/E/C 0 20 300 14 10 44 YES PDL 4/6/2026 34.137730 -117.913643 61 CPS 2255181 LACFCD CRESCENT DRAIN Crescent Dr N Enid Ave S 0 18 300 10 10 49 YES PDL 4/6/2026 34.137653 -117.913737 62 CPS 2255013 LACFCD CRESCENT DRAIN Crescent Dr N Orange Ave N/W/C 0 18 300 10 13 56 YES PDL 4/6/2026 34.137750 -117.912674 63 CPS 2255014 LACFCD CRESCENT DRAIN Crescent Dr N Orange Ave N/E/C 0 18 300 21 10 48 YES PDL 4/6/2026 34.137657 -117.912531 64 CPS 2255159 LACFCD CRESCENT DRAIN Crescent Dr N Orange Ave N/E/C 0 18 300 3.5 9 40 YES PDL 4/6/2026 34.137562 -117.912409 65 CPS 2255160 LACFCD CRESCENT DRAIN Crescent Dr N Orange Ave S/E/C 0 8 300 3.5 10 42 YES PDL 4/6/2026 34.137462 -117.912433 66 CPS 2255161 LACFCD CRESCENT DRAIN Crescent Dr N Sunset Ave N/E/C 0 18 300 7 7 44 YES PDL 4/6/2026 34.137524 -117.911195 67 CPS 2255017 LACFCD CRESCENT DRAIN W 9th St N Angeleno Ave N/W/S 0 18 300 10 10 45 YES PDL 4/6/2026 34.137579 -117.910169 68 CPS 2255018 LACFCD CRESCENT DRAIN W 9th St N Angeleno Ave N/E/C 0 18 300 10 12 50 YES PDL 4/6/2026 34.137506 -117.910009 69 CPS 2255162 LACFCD CRESCENT DRAIN W 9th St N Angeleno Ave N/E/C 0 18 300 7 11 56 YES PDL 4/6/2026 34.137394 -117.910019 70 CPS 2255207 LACFCD CRESCENT DRAIN W 9th St N Angeleno Ave N/E/S 0 20 300 3.5 12 58 YES PDL 4/6/2026 34.137307 -117.909580 71 CPS 2255164 LACFCD CRESCENT DRAIN W 9th St N San Gabriel Ave N/W/C 0 20 300 21 10 60 YES PDL 4/6/2026 34.137382 -117.908920 72 CPS 2255168 LACFCD CRESCENT DRAIN W 9th St N San Gabriel Ave S/W/C 0 18 300 3.5 44 68 YES PDL 4/6/2026 34.137171 -117.909012 73 CPS 2255163 LACFCD CRESCENT DRAIN W 9th St N San Gabriel Ave N/W/S 0 20 300 21 10 53 YES PDL 4/6/2026 34.137302 -117.909155 74 CPS 2255169 LACFCD BI 1601 - LINE C W 9th St N Azusa Ave S/W/S 0 18 300 3.5 10 36 YES PDL 4/6/2026 34.137158 -117.907772 75 CPS 2255167 LACFCD BI 1601 - LINE C W 9th St N Azusa Ave N/W/C 0 18 300 10 7 43 YES PDL 4/6/2026 34.137291 -117.907672 76 CPS 2255170 LACFCD BI 1601 - LINE C W 9th St N Azusa Ave N/W/S 0 18 300 21 12 48 YES PDL 4/6/2026 34.137384 -117.907602 77 CPS 2255171 LACFCD BI 1601 - LINE C E 9th St N Alameda Ave S/W/S 0 18 300 3.5 10 42 YES PDL 4/6/2026 34.137137 -117.906432 78 CPS 2255172 LACFCD BI 1601 - LINE C E 9th St N Alameda Ave N/WC 0 18 300 10 10 37 YES PDL 4/6/2026 34.137309 -117.906441 79 CPS 2255174 LACFCD BI 1601 - LINE C E 9th St N Alameda Ave N/E/C 0 16 300 3.5 10 41 YES PDL 4/6/2026 34.137371 -117.906091 80 CPS 2255176 LACFCD BI 1601 - LINE C E 9th St Dalton Ave S/W/C 0 18 300 3.5 7 35 YES PDL 4/6/2026 34.137142 -117.905130 81 CPS 2255175 LACFCD BI 1601 - LINE C E 9th St Dalton Ave N/W/C 0 16 300 10 8 50 YES PDL 4/6/2026 34.137280 -117.905119 82 CPS 2255177 LACFCD BI 1601 - LINE C E 9th St Dalton Ave N/W/S 0 18 300 14 11 64 YES PDL 4/6/2026 34.137416 -117.905018 83 CPS 2255178 LACFCD BI 1601 - LINE C E 9th St Dalton Ave N/E/C 0 22 300 3.5 12 92 YES PDL 4/6/2026 34.137346 -117.904861 84 CPS 2255158 LACFCD BI 1601 - LINE C E 9th St N Soldano Ave S/W/C 0 16 300 3.5 10 35 YES PDL 4/6/2026 34.137116 -117.903851 85 CPS 2255179 LACFCD BI 1601 - LINE C E 9th St N Soldano Ave N/W/C 0 18 300 7 10 32 YES PDL 4/6/2026 34.137275 -117.903846 86 CPS 2255180 LACFCD BI 1601 - LINE C E 9th St N Soldano Ave N/W/S 0 18 300 14 10 54 YES PDL 4/6/2026 34.137356 -117.903753 87 CPS 2298106 LACFCD BI 1601 - LINE C E 9th St N Soldano Ave N/E/C 0 20 300 3.5 13 60 YES PDL 4/6/2026 34.137356 -117.903606 88 CPS 2298108 LACFCD BI 1601 - LINE C E 9th St N Pasadena Ave S/W/S 0 18 300 7 9 46 YES RC 4/6/2026 34.137123 -117.902685 89 CPS 2298107 LACFCD BI 1601 - LINE C E 9th St N Pasadena Ave N/W/C 0 18 300 10 10 45 YES RC 4/6/2026 34.137306 -117.902626 90 CPS 2298109 LACFCD BI 1601 - LINE C E 9th St N Pasadena Ave N/W/S 0 16 300 3.5 12 50 YES RC 4/6/2026 34.137393 -117.902500 91 CPS 2298110 LACFCD BI 1601 - LINE C E 9th St N Pasadena Ave N/E/C 0 18 300 21 14 44 YES RC 4/6/2026 34.137464 -117.902346 92 CPS 2255114 LACFCD BI 9718 W 5th St N Barbara Ave N/E/C 0 18 300 3.5 11 48 YES PDL 4/6/2026 34.129973 -117.916698 93 CPS 2255115 LACFCD BI 9718 W 5th St N Barbara Ave S/E/C 0 18 300 3.5 11 43 YES PDL 4/6/2026 34.129862 -117.916713 94 CPS 2255116 LACFCD BI 9718 W 5th St N Vernon Ave N/W/S 0 20 300 7 11 75 YES PDL 4/6/2026 34.130069 -117.915865 95 CPS 2255117 LACFCD BI 9718 W 5th St N Vernon Ave N/E/S 0 20 300 14 11 106 YES PDL 4/6/2026 34.130068 -117.915747 96 CPS 2255275 LACFCD FOOTELENO DRAIN W 5th St N Lemon Ave N/W/C 0 18 300 3.5 11 50 YES PDL 4/6/2026 34.129957 -117.913902 97 CPS 2255230 LACFCD FOOTELENO DRAIN W 5th St N Lemon Ave N/E/C 0 18 300 3.5 9 52 YES PDL 4/6/2026 34.130021 -117.913661 98 CPS 2255232 LACFCD FOOTELENO DRAIN W 5th St N Orange Ave S/W/C 0 18 300 3.5 11 56 YES PDL 4/6/2026 34.129850 -117.912797 99 CPS 2255245 LACFCD FOOTELENO DRAIN W 5th St N Orange Ave N/W/C 0 18 300 3.5 11 62 YES PDL 4/6/2026 34.129947 -117.912841 100 CPS 2255223 LACFCD FOOTELENO DRAIN W 5th St N Orange Ave N/W/C 0 18 300 3.5 8 88 YES PDL 4/6/2026 34.130049 -117.912742 101 CPS 2255281 LACFCD FOOTELENO DRAIN W 5th St N Orange Ave N/E/C 0 18 300 3.5 9 72 YES PDL 4/6/2026 34.130068 -117.912574 102 CPS 2255263 LACFCD FOOTELENO DRAIN W 5th St N Orange Ave N/E/C 0 18 300 3.5 10 98 YES PDL 4/6/2026 34.129948 -117.912426 103 CPS 2255240 LACFCD FOOTELENO DRAIN W 5th St N Orange Ave S/E/C 0 18 300 3.5 10 67 YES PDL 4/6/2026 34.129843 -117.912508 104 CPS 2255293 LACFCD FOOTELENO DRAIN W 5th St N Angeleno Ave N/W/C 0 18 300 3.5 10 62 YES PDL 4/6/2026 34.130033 -117.910229 105 CPS 2255291 LACFCD FOOTELENO DRAIN W 5th St N Angeleno Ave N/E/C 0 18 300 3.5 11 54 YES PDL 4/6/2026 34.130027 -117.910083 106 CPS 2255285 LACFCD FOOTELENO DRAIN W 5th St N Angeleno Ave N/E/C 0 18 300 3.5 11 53 YES PDL 4/6/2026 34.129929 -117.909960 107 CPS 2255123 LACFCD FOOTELENO DRAIN W Bayless St N Orange Ave N/W/C 0 22 300 7 10 87 YES RC 4/7/2026 34.129051 -117.912862 108 CPS 2255124 LACFCD FOOTELENO DRAIN W Bayless St N Orange Ave N/W/C 0 18 300 3.5 10 51 YES RC 4/7/2026 34.129131 -117.912727 109 CPS 2255125 LACFCD FOOTELENO DRAIN W Bayless St N Orange Ave S/W/C 0 16 300 3.5 11 40 YES RC 4/7/2026 34.128945 -117.912891 110 CPS 2255119 LACFCD BI 9718 W 4th St N Vernon Ave N/W/C 0 18 300 3.5 11 38 YES RC 4/7/2026 34.128151 -117.915981 111 CPS 2255120 LACFCD BI 9718 W 4th St N Vernon Ave N/W/S 0 20 300 7 13 49 YES RC 4/7/2026 34.128269 -117.915872 112 CPS 2255121 LACFCD BI 9718 W 4th St N Vernon Ave N/E/S 0 20 300 7 12 51 YES RC 4/7/2026 34.128283 -117.915759 113 CPS 2255127 LACFCD BI 1119 W 4th St N Orange Pl N/E/S 0 16 300 3.5 12 35 YES RC 4/7/2026 34.128129 -117.913664 114 CPS 2255128 LACFCD BI 1119 W 4th St N Orange Pl S/E/C 0 16 300 7 13 50 YES RC 4/7/2026 34.128029 -117.913466 115 CPS 2255126 LACFCD BI 1119 W 4th St N Orange Ave N/W/S 0 32 300 3.5 143 82 YES RC 4/7/2026 34.128256 -117.912730 116 CPS 2255131 LACFCD BI 1119 W 4th St N Orange Ave N/E/C 0 24 300 3.5 13 66 YES RC 4/7/2026 34.128129 -117.912505 117 CPS 2255130 LACFCD FOOTELENO DRAIN W 4th St N Orange Ave S/E/S 0 18 300 3.5 12 46 YES RC 4/7/2026 34.128037 -117.912494 118 CPS 2255286 LACFCD FOOTELENO DRAIN W 4th St N Angeleno Ave N/W/C 0 18 300 3.5 11 48 YES PDL 4/6/2026 34.128199 -117.910260 119 CPS 2255292 LACFCD FOOTELENO DRAIN W 4th St N Angeleno Ave N/E/C 0 18 300 3.5 1 58 YES PDL 4/6/2026 34.128188 -117.910091 120 CPS 2255287 LACFCD FOOTELENO DRAIN W 4th St N Angeleno Ave N/W/C 0 18 300 3.5 10 50 YES PDL 4/6/2026 34.128112 -117.909997 121 CPS 2256031 LACFCD BI 1119 W Hollyvale St N Orange Pl S/W/S 0 16 300 7 13 46 YES RC 4/7/2026 34.127133 -117.914152 122 CPS 2256030 LACFCD BI 1119 W Hollyvale St N Orange Pl N/E/C 0 16 300 3.5 13 59 YES PDL 4/6/2026 34.127239 -117.914070 123 CPS 2256032 LACFCD BI 1119 W 3rd St N Orange Pl N/E/S 0 16 300 7 13 48 YES RC 4/7/2026 34.126417 -117.913791 124 CPS 2256033 LACFCD BI 1119 W 3rd St N Orange Pl S/W/C 0 16 300 7 12 40 YES RC 4/7/2026 34.126230 -117.913716 125 CPS 2256034 LACFCD BI 1119 W 3rd St N Orange Pl N/W/C 2 18 303 7 0 60 YES RC 4/7/2026 34.126300 -117.913653 126 CPS 2256035 LACFCD BI 1119 W 3rd St N Orange Pl N/E/C 0 16 300 7 13 31 YES RC 4/7/2026 34.126334 -117.913481 Deerlane Dr
Royal Oaks Dr
Elda St
Opal Canyon Rd
Tocino Dr
M
el Canyon
Rd
Greenbank Ave
Conata St
Freeborn St
Gardi St
Valley View
(Remote)
Elementary
School
Encanto Pkw
Ra
y
ncho Rd
Treefern Dr
San Marcus Ln
Huntington Dr
E Foothill Blvd
Rancho Duarte
Golf Course
Hacienda Park
AT And SF Rlwy
210
E Foothill Blvd
E
1st St
Martin R
d
E First
Ayala Ave
1st St
S
outhern
Pacific
RR
4th St
Southern Pacific R
R
4th St
La Sena Ave
Anniston Ave
Sandstone St
Arrow Hwy
Azusa Canyon Rd
Fraijo Ave
Azusa Canyon Rd
Cypress Ave
Fish Canyon Rd
San Gabrie l River
Conata St
Conata
St
Tassel Mtwy
Encanto Pkwy
Elkhorn Dr
Elda St
Shadylawn Dr
Royal Oaks Dr
Tannencrest Dr
Deerlane Dr
Clarkview
Dr
Brookridge Rd
Encanto Park
San Gabriel River
Southern Pacific RR
N Todd Ave
Encanto Pkwy
210
Adelante St
A
W Optical Dr
venida Padilla
N
Aerojet Way
N Irwindale Ave
E Foothill Blvd
38 38
W 1s E 1st St
t St
S Motor Ave
S Peckham
Rd
S Van Ness Ave
N Irwindale Ave S Irwindale Ave
Ornelas St
Ornelas St
W Gladstone St
Salvatiera St
Ayon Ave
S Motor Ave
2nd St
3rd St
Morada St
W Gladstone St
Irwindale Ave
S Irwindale Ave
Big Dalton Wash
Ayon Ave
Hidalgo St
Tapia St
Peppertree Ln
Calle Breceda
Central St
Martinez St
Allen Dr
Calle del Norte
Charter St
Calle del Sur
Sabre Ln
Juarez St
Arrow Hwy
Wendy's
Irwindale
E Benbow St
Foxdale St
E Cypress St
Edna Pl
Nora Ave
E Kingside Dr E Kingside Dr
Huston St
E Edna Pl
E Benwood St
E Royal Estates Dr
E Queenside Dr
E Queenside Dr
Irwindale Ave
E Cypress St
N Irwindale Ave
Cypress Ave
Merwin
Elementary
School
Fish Canyon Rd
San Gabriel River
Mountain View
Cir
N
Avenida Conejo
N Todd A
ve
W Virginia Ann Dr
W Lori Ann Ave
N Coney Ave
W Sierra Madre Ave
N
Vernon Ave
N Loren Ave
W 8th St
W 10th St
N Todd Ave
N Todd Ave
W Calle del Sol
3rd St
N Georgia Ave
Azusa Greens
Country Club
AT And SF Rlwy
210
210
W 3rd St
North St
W 5th St
N Virginia Ave
W 6th St
W Industrial St
W 4th St
W 4th St
N Barbara Ave
W Bayless St
East Ave
W Foothill Blvd W Foothill Blvd W Foothill Blvd
39 N Vernon Ave
S Virginia Ave
S Virginia Ave
S Aspan Ave S Aspan Ave
S Jackson Ave
N Barbara Ave
Solem St
N Aspan Ave
S
Vernon Ave
Zacatecas Park
Mountain View
Elementary
School
W Kirkwall Rd
N
Clydebank Ave
S
Duggan Ave
S Virginia Ave
E Laxford Rd
N Gareloch Ave
N
Roxburg
h
Ave
W Arrow Hwy
E Newburgh St
E Renwick Rd
S Aspan Ave
S Jackson Ave
S Lark Ellen Ave
W Gladstone St
N Lark Ellen Ave S
Vernon Ave
S
Vincent Ave
Valleydale Park
Big Dalton Wash
E Bellbrook St E Bellbrook St
E Devanah St
E Tudor St
E Gragmont St
E Masline St
E Groverdale St
N Coney
Ave
N Clydebank Ave
N Saint Malo
Ave
E Brookport St
E Greenhaven St
N Cranley Ave
E Bygrove St
N Burwood
Ave
N Lark Ellen Ave
E Arrow Hwy
N
Vincent Ave
Arrow Hwy W Arrow Hwy
Covina Islands
E Cypress St
E Cypress St
E Queenside Dr
E Benbow St
E Benbow St
E Edna Pl E Edna Pl
E Clovermead St
E Benwood St
E Benwood St
E Kingside Dr
N Trujillo Dr
N Roxburgh Ave
N Lark Ellen Ave N Lark Ellen Ave
N
Vincent Ave
E Cypress St
Lark Ellen
Elementary
School
San Gabriel River
San
Gabriel R iver
39 N
San G
a
briel C
anyon Rd
N
San
Gabriel Canyon Rd
Ranch
Rd
E Sierra Madre Ave
N
S
an G
abriel C
anyon Rd
N
San Gabriel Ave
W Sierra Madre Ave
Ranch Rd
Old San Gabriel Canyon Rd
N Hilltop Dr
N Azusa Ave
W Ashby St
N Sunset Ave
W Virginia Ann Dr
Montecito Dr
E 13th St
Timberline Dr
Sunset Dr
39 39
N Alameda Ave N Alameda Ave
N San Gabriel Ave
N McKeever Ave
N McKeever Ave
N Angeleno Ave
N Orange Ave
N Sunset Ave
W Crescent Dr
W 12th St
W 9th St
W 9th St
N Vernon Ave
W 10th St
E 11th St
N Azusa Ave
E 9th St
N Enid Ave
Cherry Hills Ln
W Danlee St
Azuza City Hall
Northside Park
Longfellow
Hodge (Victor F)
Elementary
School
39 39
N San Gabriel Ave
N Vernon Ave
N
Vernon
Ave
W 3rd St
N Alameda Ave
N Orange Ave
N Azusa Ave
N Angeleno Ave
W 4th St
E 6th St
W Foothill Blvd
N Sunset Ave
E 3rd St
W 5th St
N Lemon Ave
E 4th St
N Louise Ave
W Bayless St
N Orange Pl
W Foothill Blvd
Memorial Park
Slauson Middle
School
Azusa
210
W Duell St W Duell St
W Paramount St
W 2nd St
W 2nd St
N Azusa Ave
S Lemon Ave
N Alameda Ave
S Orange Ave
E Azusa Ln
S Enid Ave
S
Arthur Ave
S
Angeleno Ave
S Louise Ave
S Louise Ave
E Dixon St
W San Gabriel Pl
S
Azusa Ave
Paramount
Elementary
School
39 40
39 N Enid Ave
E Payson St
E Orkney St
E Newburgh St
E Newburgh St
S Louise Ave
E Laxford Rd
S Orange Ave
S Enid Ave
S Sunset Ave
E Roland St
E Russell St
E Millburgh Rd
Center St
Diamond St
N Donna Beth Ave
S Donna Beth Ave
N
Leaf Ave
N Leaf Ave
E Woodcroft St
N Banewell Ave
E Renwick Rd
W Gladstone St E Gladstone St
S
Azusa Ave
Christbridge
Academy
Valleydale
Elementary
School
Big Dalton Wash
San Dimas Wash
39 39
E Bellbrook St
E Tudor St
E Gragmont St
W Covina Blvd
E Arrow Hwy
W Grondahl St
N
C
onwell Ave
E Groverdale St
W Masline St
N Rimsdale A
ve
E Brookport St
E Nubia St
W Greenhaven St
E Bygrove St
E Devanah St
E Alcross St
E Arrow Hwy
N
Azusa Ave
Covina Town
Square
Shopping
Center
Gladstone High
School
E Queenside Dr
W Chester Rd
W Golden Grove Way
N Homerest Ave
E Benbow St
W Edna Pl
W Edna Pl
W Griswold Rd
W Queenside Dr
E Benwood St
E Edna Pl
W Benwood St
W Fredkin Dr
N
Leaf
Ave
W Benbow St
E Cyp W Cypress St
ress St
N
Azusa Ave
Northview High
School
San Gabriel River
N San
Gabriel Canyon Rd
Mountain Laurel Way
Highwood Ct
Turning Leaf Way
Silv er Forest Ct
Moonridge Ct
Boulder Ridge Ct
Wildflower Way
39 Mountain Laurel Way
N San Gabriel Canyon Rd
M
ossdale Ct
Pasadena City
Open Space
Camellia Way
E Sierra Madre Ave
S
proul Ave
Old Sierra Madre Ave
Azusa Veterans Way
N Vosburg
Dr
E Mandevilla Way
Gardenia Dr
E 13th St
Lemon
Swirl Dr
E Viewcrest Dr
E Rainbow Dr
Pioneer Park
N Dalton Ave
N Dalton Ave
N Dalton Ave
E 9th St
N Pasadena Ave
Azusa Veterans Way
E Vosburg Dr
E 8th St
Rosedale Ave
Barberry Way
E Promenade
Ruby Lace Way
N Soldano Ave N Soldano Ave
E 11th St
Haggard Way
E Box wood Ln
Lemon Swirl Dr
N
Old Mill Rd
N Holmar Ave
E Rainbow Dr
Rockvale Ave
Dalton (Henry)
Elementary
School
Little Dalton Wash
E 5th St E 5th St
E Foothill Blvd
E Hollyvale St
E 3rd St
E 6th St E 6th St
E 4th St
Rockvale Ave
N Soldano Ave
N Dalton Ave
E Haltern St
E Matchwood St E Matchwood Pl
E Lee Pl
N
Rodecker Dr
E Hanks St
N Durrell Ave
E Foothill Blvd
E Alosta Ave
Slauson Park
Lee (Charles H)
Elementary
School
St. Frances of
Rome
Elementary
School
S Cerritos Ave N Cerritos Ave
N Soldano Ave
N Pasadena Ave
E Duell St
S Elliott Ave
E 2nd St
S Pasadena Ave
E McKinley St
Rockvale Ave Rockvale Ave
Glenfinnan Ave
E Glenlyn Dr
E Alford St
S Murray Ave
N
Rodecker Dr
S
O
malley Ave
E Bellefont Dr
E Citrus Edge St
Cedarglen Dr
E Dixon St
S Noble Ave
N Dalton Ave
E Manning St
E Linfield St
E 1st St E Baseline Rd
Foothill Middle
School
Azusa High
School
40 41
S
Cerritos Ave N Cerritos Ave
E Laxford Rd
E Newburgh St E Newburgh St
Glenfinnan Ave
Rockvale Ave
E Payson St
E Russell St
E Roland St
E Orkney St
E Orkney St
E Kirkwall Rd
N Duxford Ave
E Woodcroft St
E Woodcroft St
Cedarglen Dr
E Renwick Rd E Renwick Rd
E Ghent St
N Heathdale Ave
E Celeste St
E Gladstone St
Edgewood
Shopping
Center
Center Middle
School
Murray (Clifford
D) Elementary
School
San Dimas Wash
W Covina Blvd
N
W Nubia St
Eastbury Ave
N
Heathdale Ave
E Covina Blvd
N Fircroft Ave
N Aldenville Av
N
e
Armel Dr
E Brookport St
W Grondahl St
W Grove
W Grondahl St
rdale St
W Alcross St
W Arrow Hwy
N O
Malley Ave
W Tudor St
E Arrow Hw E Arrow Hwy
y
Cypress Ball
Park
Hollenbeck Park
Valencia
Elementary
School
N Larkin Dr N Larkin Dr
N Heathdale Ave
N Glenfinnan Ave
N Hollenbeck Ave
N Hollenbeck Ave
E Benbow St
N 4th Ave
N
Elspeth Way
E Edna Pl
W Edna Pl
W Edna Pl
N Cedar Dr
N 5th Ave
N Eastbury Ave
E Bellbrook St
E Benwood St
N Armel Dr
N Duxford Ave
N Conwell Ave
N Fircroft Ave
W Cypress St E Cypress St
Cypress
Elementary
School
39 39
San
Gabriel Canyon
Rd
39 San Gabriel Canyon Rd
Glendora Ridge Mtwy
N Old San Gabriel Canyon Rd
Foxglove Ct
E Sierra Madre Ave
N Macneil Dr
W Donington St
Iris Ln
N Crape
Myrtle Dr
Hicrest Rd
Hicrest
Rd
N Yucca Ridge Rd
Los Angeles
County Fire
Department
Station #97
N Oak Dr
W Leadora Ave
Orchid Way
E Promenade
Palm
Dr
Palm
Dr
Pa ml Dr
N
Baldy
Vista Ave
E 9th St
Elderberry Dr
N Macneil Dr
N
Citrus Ave
E Leadora Ave
Snapdragon Ln
W Milton Dr W Milton Dr
E Mountain Way
W Newhill St
E Manresa
Dr
Shorey Dr
N
Citrus Ave
W Foothill Blvd
Little Dalton Wash
Campus Dr
N Fenimore Ave
Stadium Way
E Foothill Blvd
E Hollyvale St
E 5th St
College Dr
E Haltern St
E Haltern St
N Twintree Ave
Club Way
Circle Dr
Shire Way
N Calera Ave
N
Citrus Ave
E Alosta Ave
Foothill Center
Shopping
Center
Citrus
Community
College
Azusa Pacific
University
Powell (W R)
Elementary
School
Light and Life
Christian
210
S
Fairvale Ave
E Mauna Loa Ave
N Fenimore Ave
E Duell St
N Factor Ave
N Calvados Ave
E Glenlyn Dr E Glenlyn Dr
S Ranburn Ave
E Alford St
N Viceroy Ave
N Viceroy Ave
E Galatea St
E Galatea St
N Oakbank
Dr
E Bellefont Dr
E Nearfield St
E Nearfield St
N Edenfield Ave
E Fondale St
E Fondale St
E Armstead St
E Armstead St
E Petunia St
N Calera Ave
E Citrus Edge St
E Citrus Edge St
E Baseline Rd E Baseline Rd
S
Citrus Ave N
Citrus Ave
Magnolia
Elementary
School
41 E Payson St
S Fairvale
Ave
E Laxford Rd
E Chadley St
E Ghent St
E Ghent St
E Renwick Rd
E Kirkwall Rd
E Gallarno Dr
N Oakbank Ave
N Ranger Dr
E Newburgh St
E Orkney St
E Gaillard St
S
Galanto Ave
S
Citrus Ave S
Citrus Ave
E Gladstone St
N
Citrus Ave
Gladstone
Street
Elementary
School
Citrus
San Dimas Wash
N Edenfield Ave
N Viceroy A
ve
N Fairvalley Ave
N Fairvalley Ave
W Devanah St
N Fairvale Ave
E Covina Blvd
E Covina Blvd
E Nubia St
W Grondahl St
N Fen mi ore Ave
N Calvados Ave
W Bygrove St
E Greenhaven St
W Alcross St
G St
B St
E St
H St
N Calera Ave
N
Citrus Ave
E Arrow Hwy
Fairvalley High
(Continuation)
School
N 1st Ave
W Edna Pl
E Kelby St
E Hurst St
E Benbow St
E Benbow St
E Benwood St
E Bellbrook St
N Fen mi ore Ave
N Edenfield Ave
N Calvados Av e
N Viceroy Ave
E Cypress St
N
Citrus Ave
N
Citrus Ave
Covina Station
Glendora Ridge Mtwy
Hicrest Rd
E Sierra M
E La Fetra
N Barranca Ave
E La Cros
N Barranca Ave
W Leadora Ave
Elderberry Dr
W Milton Dr
E Leadora A
Windermere Ln
Stadium Way
N
Barranca Ave
N Barranca Ave
E Hollyvale St
W Route
Invergarry
W Bagnal
N Hanlin Ave E Alosta Ave
College Center
Shopping
Center
210
N Barranca Ave E Mauna Loa
E Petunia St
S
Barranca Ave
E Baseline Rd
Sierra Hig
School
E Ghent St
San Jose
E Newburgh St
N Traymore Ave
E Gladstone St
S
Barranca Ave S
Barranca Ave
E Calora
E Brookport
E Nubia St
E Nubia
N
Barranca Ave Charter Oa
Islands
Edna Pl
E Benbow St
E Benwood St
Kelby Park
DWL
DWL
DWL
MU
DWL
DW
DW
DE
DWL
DW
DWL
DE
DW
MU
MU
MU
NC
DW
DWL
NC
DWL
DWL
NC
DWL
NC
DW
261
238
23 46
215
69 192
92 115
138
209
161
284
232
29 278
315
175
169
324
221
75 344
201
132
9 181
15 158
109
89 338
195
244
301
3 252
146
152
52 295
95 189
72 118
335
264
258
281
212
235
172
66 78
218
229
327
32 275
318
126
26 272
321
12 178
35 129
155
106
86 135
112
63 6
255
43 304
55 292
241
341
347
98 298
49 198
149
190
213
144
167
353
336
330
307
236
259
184
267
113
67 230
313
276
27 21
121
127
319
322
173
273
107
250
156
58 81
130
64 87
38 101
350
207
256
44 7
193
342
299
293
150
50 1
24 47
239
141
70 216
93 187
287
164
233
310
333
210
279
30 18
316
270
170
176
224
84 153
227
204
110
133
10 61
196
90 41
339
253
290
104
4 147
247
296
119
96 165
142
288
282
211
305
188
311
334
234
125
219
65 328
79 19
265
317
171
73 271
25 36
228
105
179
205
85 13
136
62 42
291
5 254
242
56 199
348
248
99 148
285
262
168
191
116
139
162
331
308
185
231
268
325
314
128
122
22 76
222
202
274
59 108
225
251
82 39
33 182
16 159
208
53 102
337
351
302
45 294
145
245
2 345
48 309
71 286
94 263
117
240
140
163
186
257
332
280
77 17
326
31 223
269
123
60 297
226
83 177
154
203
134
40 34
183
11 160
111
54 303
352
340
91 289
346
97 197
246
214
143
120
237
166
306
312
329
260
283
220
114
266
20 277
80 68
323
28 174
320
74 131
249
180
57 157
206
14 37
137
243
8 349
51 300
151
194
200
343
100
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community Legend
Azusa City Limits
Zoning
NC
DCC
DTC
DTV
MU
DE
DWL
DW
City Catch Basins
R
Map Date: 8/28/2025
Path: D:\Soto Media Projects\Active\PW - County Catch Basins\County Catch Basins\County Catch Basins.aprx (351)
Deerlane Dr
Royal Oaks Dr
Elda St
Woodbluff St
Opal Canyon Rd
Tocino Dr
Mel Canyon
Rd
Greenbank Ave
Conata St
Fieldview
A ve
Freeborn St
Gardi St
Fish Canyon Rd
Valley View
Park
Valley View
(Remote)
Elementary
School
Encanto Pkwy
Rancho Rd
Lario
San
Gabriel River Trl
Treefern Dr
Sa n Marcus
Ln
Huntington Dr
E Foothill Blvd
Rancho Duarte
Golf Course
Hacienda Park
AT And SF Rlwy
210
210
E Foothill Blvd
E 1st St
Martin R
d
E First
Ayala Ave
1st St
Southern
Pacific
RR
4th St
Arrow Hwy
Fish Canyon Rd
San Gabrie l Riv er
Conata St
Conata
St
Tassel Mtwy
Encanto Pkwy
Elkhorn Dr Elda St
Mo
u
ntain Crest Rd
Shadylawn Dr
Royal Oaks Dr
Markwood St
Tannencrest Dr
Deerlane Dr
Deerlane Dr
Clarkview
Dr
Brookridge Rd
Encanto Park
San Gabriel River
Southern Pacific RR
N Todd Ave
Encanto Pkwy
Southern Pacific R
R
210
210
Adelante St
W Optical Dr
Avenida Padilla
N Aerojet Way
N Irwindale Ave
E Foothill Blvd
38 38
W 1s E 1st St
t St
S Motor Ave
S Peckh
a
m
Rd
S Van Ness Ave
N Irwindale Ave S Irwindale Ave
Southern
Pacific
RR
Ornelas St
Ornelas St
W Gladstone St
Salvatiera St
Ayon Ave
S Motor Ave
2nd St
3rd St
Morada St
W Gladstone St
Irwindale Ave
S Irwindale Ave
Ayon Ave
Hidalgo St
Calle del Norte
Juarez St
Arrow Hwy
Wendy's
Fish Canyon Rd
San Gabriel River
Mountain View
Cir
N
Avenida Conejo
N Todd Ave
W Virginia Ann Dr
W Lori Ann Ave
N Coney Ave
W Sierra Madre Ave
N
Vernon Ave
N Loren Ave
W 8th St
W 10th St
N Todd Ave
N Todd Ave
W Calle del Sol
3rd St
N Georgia Ave
N Georgia Pl
Azusa Greens
Country Club
AT And SF Rlwy
210
210
W 3rd St
North St
Zachary Padilla Ave
W 5th St
N Virginia Ave
W 6th St
W Industrial St
W 4th St
W 4th St
N Barbara Ave
W Bayless St
East Ave
W W Foothill Blvd Foothill Blvd W Foothill Blvd
39 N Vernon Ave
S
Virginia Ave
S
Virginia Ave
S Aspan Ave S
Aspan Ave W 1st St
S Jackson Ave
Jerez St
W Paramount St
N
Barbara Ave
Solem St
Momax St
N Aspan Ave
S
Vernon Ave
Zacatecas Park
Mountain View
Elementary
School
Little Dalton Wash
W Kirkwall Rd
N
Clydebank Ave
S
Duggan Ave
S
Virginia Ave
E Laxford Rd
N Gareloch Ave
N
Rox
burg
h
Ave
W Arrow Hwy
E Newburgh St
E Renwick Rd
S
Aspan Ave
S Jackson Ave
S Lark Ellen Ave
W Gladstone St
N Lark Ellen Ave S
Vernon Ave
E Gladstone St
S
Vincent Ave
Valleydale Park
N Cranley Ave
N Varnell A
ve
E Bygrove St
rwood
A
ve
E Arrow Hwy Arrow Hwy W Arrow Hwy
S
Vincent Ave
San Gabriel River
San
Gabriel Riv er
39 N
S
an G
a
briel C
anyon Rd
N
San
Gabriel Canyon Rd
Ranch
Rd
E Sierra Madre Ave
N
S
a
n
G
abriel C
a
nyo
n
Rd
N
San Gabriel Ave
W Sierra Madre Ave
Ranch Rd
Old San Gabriel Canyon Rd
N Hilltop Dr
N Azusa Ave
W Ashby St
N
Sunset Ave
W Virginia Ann Dr
Montecito Dr
E 13th St
Timberline Dr
Crystal Cany
on Dr
Dimas Ct
Sunset Dr
N
Viewcrest Dr
N Tam
O
Shanter Dr
AT And SF Rlwy
39 39
39 N Alameda Ave N Alameda Ave
N San Gabriel Ave
N McKeever Ave
N McKeever Ave
N Angeleno Ave
N Orange Ave
N Sunset Ave
W Crescent Dr
W 11th St
W 12th St
W 12th St
W 9th St
W 9th St
N Vernon Ave
W 10th St
E 11th St
N Azusa Ave
E 9th St
N Enid Ave
Cherry Hills Ln
W Danlee St
Azuza City Hall
Northside Park
Longfellow
Hodge (Victor F)
Elementary
School
39 39
39 39
N San Gabriel Ave
N Vernon Ave
N
Vernon
Ave
W 3rd St
N Alameda Ave
N Orange Ave
N Azusa Ave
N Angeleno Ave
W Hollyvale St
W 4th St
W 6th St E 6th St
W Foothill Blvd
N Sunset Ave
E 3rd St
W 5th St
N Lemon Ave
E 4th St
N Louise Ave
W Bayless St
N Orange Pl
W Foothill Blvd
Memorial Park
Slauson Middle
School
Azusa
210
210
W Duell St W Duell St
W Paramount St
W 2nd St
W 2nd St
N Azusa
Ave
N Azusa Ave
S Lemon Ave
N Alameda Ave
S
Orange Ave
S
Orange Ave
E Azusa Ln
S
Grandin Ave
S Enid Ave
S
Sunset Ave
S
Arthur Ave
S
Angeleno Ave
S Louise Ave
S Louise Ave
E Dixon St
W San Gabriel Pl
S
Azusa Ave
Paramount
Elementary
School
39 40
39 N Enid Ave
Boulder St
E Payson St
E Orkney St
E Newburgh St
E Newburgh St
S Louise Ave
E Laxford Rd
S
Grandin Ave
S Orange Ave
S Enid Ave
S Sunset Ave
E Roland St
E Russell St
E Millburgh Rd
Center St
Diamond St
N Homerest Ave
N Donna Beth Ave
S Donna Beth Ave
N Leaf Ave
N Leaf Ave
E Woodcroft St
N Banewell Ave
E Renwick Rd
W Gladstone St E Gladstone St
S
Azusa Ave
Christbridge
Academy
Valleydale
Elementary
School
Enid Ave
E Arrow Hwy
E Bygrove St
E Alcross St
E Arrow Hwy
San Gabriel River
N
San
Gabriel Canyon Rd
Mountain Laurel Way
Highwood Ct
Turning Leaf Way
Silver Forest Ct
Moonridge Ct
Boulder Ridge Ct
Wildflower Way
San Gabriel River
39 Mo
39 untain Laurel Way
N San Gabriel Canyon Rd
Rock
Springs Way
Brookside Wa
M
y
ossdale Ct
Pasadena City
Open Space
Camellia Way
E Sierra Madre Ave
S
proul A
ve
Old Sierra Madre Ave
N Dalton Ave
Azusa Veterans Way
N Vosburg
Dr
E Mandevilla Way
Gardenia Dr
E 13th St
E Desert
Willow Rd
Lem
o
n
Swirl Dr
E Viewcrest Dr
E Rainbow Dr
Pioneer Park
N
Dalton Ave
N Dalton Ave
N Dalton Ave
E 9th St
N Pasadena Ave
Azusa Veterans Way
E Vosburg Dr
E 8th St
Rosedale Ave
Barberry Way
E Promenade
Ruby Lace Way
N Soldano Ave N Soldano Ave
E 11th St
Haggard Way
E Box wood Ln
Lemon Swirl Dr
N
Old Mill Rd
N Holmar Ave
Rockvale Ave
Dalton (Henry)
Elementary
School
Little Dalton Wash
E 5th St E 5th St
E Foothill Blvd
E Hollyvale St
E 3rd St
E 6th St E 6th St
E 4th St
Rockvale Ave
N Soldano Ave
N Dalton Ave
E Haltern St
E Matchwood St E Matchwood Pl
E Lee Pl
N
Rodecker Dr
N Durrell Ave
E Foothill Blvd
E Alosta Ave
Slauson Park
Lee (Charles H)
Elementary
School
St. Frances of
Rome
Elementary
School
210
S
Cerritos Ave N Cerritos Ave
N Soldano Ave
N Pasadena Ave
E Baseline Rd
E Duell St
S Elliott Ave
E 2nd St
S Pasadena Ave E McKinley St
Rockvale Ave Rockvale Ave
Glenfinnan Ave
E Glenlyn Dr
E Alford St
S
Murray Ave
N
Rodecker Dr
N Rodecker Dr
E Hanks St
S
O
malley Ave
E Bellefont Dr
E Citrus Edge St
Cedarglen Dr
E Dixon St
S Noble Ave
E M ason St
N Dalton Ave
E Manning St
E Linfield St
E 1st St E Baseline Rd
Foothill Middle
School
Azusa High
School
40 41
S
Cerritos Ave
S
Cerritos Ave N Cerritos A
ve
N Cerritos Ave
E Laxford Rd
E Newburgh St E Newburgh St
Glenfinnan Ave
Rockvale Ave
E Payson St
E Russell St
E Roland St
E Orkney St
E Orkney St
E Kirkwall Rd
N Duxford Ave
E Woodcroft St
E Woodcroft St
Cedarglen Dr
E Renwick Rd E Renwick Rd
E Ghent St
N Heathdale Ave
N Conwell Ave
E Celeste St
E Gladstone St
Edgewood
Shopping
Center
Center Middle
School
Murray (Clifford
D) Elementary
School
croft Ave
W Alcross St
W Arrow Hwy
E A
E Arrow Hwy
rrow Hwy
39 San Gabriel Cany
on Rd
Glendora Ridge Mtwy
N Old San Gabriel Canyon Rd
Foxglove Ct
E Sierra Madre Ave
N Macneil Dr
W Donington St
E Griffith St
Iris Ln
N Crape
Myrtle
Dr
Hicrest Rd
Hicrest Rd
N Yucca Ridge Rd
E McKeller Ct
Los Angeles
County Fire
Department
Station #97
N Oak Dr
W Leadora Ave
Orchid Way
E Promenade
Palm
Dr
Palm
Dr Pa ml Dr
Pa ml Dr
E Monrovia Pl
Iris Way
N
Baldy
Vista Ave
E 9th St
Elderberry Dr
N Macneil Dr
N
Citrus Ave
E Leadora Ave
Snapdragon Ln
W Milton Dr W Milton Dr
E Mountain Way
N
Oakbank Dr
W Newhill St
E Manresa
Dr
Shorey Dr
N
Citrus Ave
W Foothill Blvd
Little Dalton Wash
Campus Dr
N Fenimore Ave
Stadium Way
E Foothill Blvd
Palm
Dr
E Hollyvale St
University Way
E 5th St
College Dr
E Haltern St
E Haltern St
N Twintree Ave
Club Way
Circle Dr
Shire Way
N Calera Ave
N Oakbank Dr
N Galanto Ave
N
Citrus Ave
E Alosta Ave
Foothill Center
Shopping
Center
Citrus
Community
College
Azusa Pacific
University
Powell (W R)
Elementary
School
Light and Life
Christian
210
210
S
Fairvale Ave
E Mauna Loa Ave
N Fenimore Ave
E Duell St
N Factor Ave
N Calvados Ave
E Glenlyn Dr E Glenlyn Dr
S
Ranburn Ave
E Alford St
N Viceroy Ave
N Viceroy Ave
E Galatea St
E Galatea St
N Oakbank
Dr
E Bellefont Dr
E Nearfield St
E Nearfield St
N Edenfield Ave
E Fondale St
E Fondale St
E Armstead St
E Armstead St
E Petunia St
N
Calera Ave
E Citrus Edge St
E Citrus Edge St
E Baseline Rd E Baseline Rd
S
Citrus Ave N
Citrus Ave
Magnolia
Elementary
School
41 E Gladstone St
E Payson St
S Fairvale
Ave
E Laxford Rd
E Chadley St
E Ghent St
E Ghent St
E Arrow Hwy
E Renwick Rd
E Kirkwall Rd
E Gallarno Dr
N Oakbank Ave
N
Ranger Dr
E Newburgh St
E Orkney St
E Gaillard St
S
Grantland Dr
S
Galanto Ave
S
Citrus Ave S
Citrus Ave
E Gladstone St
N
Citrus Ave
Gladstone
Street
Elementary
School
Citrus
N Fairvalley Ave
W Bygrove St
W Alcross St
H St
N Calera Ave
E Arrow Hwy
Glendora Ridge Mtwy
Hicrest Rd
E Sierra Madre Av
E La Fetra Dr
N Barranca Ave
E La Crosse St
N Barranca Ave
W Leadora Ave
Elderberry Dr
W Milton Dr
E Leadora Ave
S Marcile Ave
Windermere Ln
W Dalton St
W Heber S
Stadium Way
N Barranca Ave
N Barranca Ave
E Hollyvale St
E Hollyvale St
W Carro
E Haltern Ave
Bridwell
W Route 66
Invergarry St
W Bagnall St
E Orangepa
N Hanlin Ave E Alosta Ave
College Center
Shopping
Center
210
W Basel
N Barranca Ave
E Mauna Loa Ave
E Petunia St
N Briargate Ln
E Armstead St S
Barranca Ave
E Baseline Rd
Sierra High
School
42 E Ghent St
San Jose
E Newburgh St
N Traymore Ave
E Gladstone St
S
Barranca Ave S
Barranca Ave
Charter Oak
Islands
DWL
DWL
DWL
DWL
DE
DWL
DWL
DWL
DW
MU
DWL
DW
DWL
DWL
DE
DW
MU
MU
DW
MU
NC
DW
DWL
NC
DWL
DWL
DWL
NC
DWL
NC
DW
DW
DWL
2298084
2298100
2298096
2255045 2255046
2255023
2256095
2299094
2255044
2299147
2255032
2299129
2255038
2299134
2255146
2255077
2298131
2298129
2255282
2299133
2298154
2299106
2256212
2298094
2299100
2255131
2299111
2255035
2255031
2255024
2254022
2256165
2256064
2256131
2256137
2254009
2254016
2255263
2254020
2255272
2255073
2256025
2256022
2256012
2256136
2255183
2256034
2254026
2256010
2255212
2255115
2255088
2256254
2256073
2256018
2256035
2256019
2256166
2255063
2255293
2298099
2255285
2299077
2299076
2255011
2255161
2255164
2299182
2299073
2255198
2255199
2255292
2298115
2299188
2299098
2299096
2299140
2299141
2255052
2298124
2255054
2255040
2255059
2298151
2255142
2255268
2299136
2299124
2298126
2299117
2298109
2256005
2256061
2254007
2254018
2255090
2256023
2255186
2256067
2256092
2256066
2255065
2255087
2254023
2255109
2255116
2256125
2256004
2256126
2255163
2255170 2255174
2255288
2255274
2299075
2255016
2298161
2255010
2255060
2255014
2255018
2255195
2255230
2256086
2299092
2299091
2299143
2299093
2299138
2255026
2255184
2298125
2255033
2298157
2255242
2298149
2255259
2299126
2299131
2255055
2255240
2255275
2255024
2255193
2255114
2255108
2255118
2255192
2255291
2255185
2256122
2256093
2256190
2256077
2256015
2254013
2255245
2255251
2255167
2255005
2255082
2299207
2299208
2299001
2299178
2255007
2255143 2298132
2255015
2298098 2298105
2256296
2256273
2255022
2298117
2255029
2255148
2298148
2255145
2299102
2255036
2256087
2255039
2298088
2256183
2255120
2256169
2256008
2256091
2256084
2255191
2255112
2256168
2256170
2256009
2254008
2254025
2298144
2255128
2256121
2255281
2255165
2298107
2255181
2255171 2255158
2255001
2255079
2255066
2299200
2255159
2255168
2298263
2255008
2255017
2255196
2255197
2255048
2256289
2255030
2255028
2298090
2255049 2255042
2298116
2298134
2298123
2299132
2298156
2299050
2299125
2298118
2255058
2299095
2255111
2298267
2256179
2256167
2256095
2254017
2254010
2254021
2256184
2255089
2255126
2255265
2256011
2256013
2256006
2255213
2255072
2298269
2255064
2299190
2255200
2255179
2255287
2255177
2255176
2255125
2255162
2255080
2255078
2255260
2255084
2255081 2255003
2299003
2255201
2299079
2255004
2255012
2299070
2255083
2298103
2298102
2255027
2298087
2298127
2299145
2299097
2299099
2299144
2255019
2256068
2256069
2299127
2299103
2299048
2298086
2255037
2298089
2255051
2255057
2255020
2298122
2298155
2299135
2255144
2298150
2298147
2255141
2298152
2298133
2299128
2255194
2255053
2299110
2299107
2256130
2256016
2256063
2254019
2255132
2298143
2255182
2256085
2255189
2298106
2256017
2256075
2255113
2256003
2255119
2256072
2255086
2256031
2255188
2255110
2256094
2255173
2255002
2255254
2299176
2255009
2255140
2255013
2298166
2255041
2298110
2255034
2256297
2298085
2299139
2255043
2256065
2298128
2298091
2298093
2255147 2298135
2298153
2298145
2299104
2299123
2255056
2299105
2299101
2255187
2256030
2256020
2256135
2256036
2255122
2255071
2254028
2256071
2255117
2298158
2256070
2256001
2256032
2256132
2256182
2254015
2255085
2256002
2298247
2256090
2256014
2256074
2256247
2255290
2255286
2255232
2255006
2255172
2255180
2298108
2255178
2255223
2299004
2299201
2255289
2255160
2298146
2299002
2255021
2298101
2298095
2299189
2299146
2299142
2255190
2299108
2255050
2256026
2299130
2255025
2256086
2255047
2256062
2299049
2298111
2298092
2256021
2256185
2256076
2256134
2255129
2254014
2256007
2255121
2255127
2256024
2255130
2254027
2256189
2255123
2256138
2255091
2298141
2298268
2256033
2255175
2255169
2255068
2255207
2255124
2299078
2299181
2299074
2299199
2299180
2255217
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community Legend
LA County Catch Basins
Azusa City Limits
Zoning
NC
DCC
DTC
DTV
MU
DE
DWL
DW
R
Map Date: 8/28/2025
Path: D:\Soto Media Projects\Active\PW - County Catch Basins\County Catch Basins\County Catch Basins.aprx (445)