F e b u r ar y 2024
Central Valley Stations Board Presentation Draft
California High-Speed Rail
Project Schedule
Pre-Design ConstructionDesign T esting
Platform Level 37’
Platform Level 3’
Platform Level 7’
Platform Level 43’
Platform Level 56’
Merced
Superstructure
Canopy
Station, VT, Envelope
Fresno Kings T ulare Bakersfield
Canopy Level 96’
Canopy Level 82’
Canopy Level 82’
Canopy Level 84’
Kit of Parts
Canopy
PlatformVertical Transportation
Program
Structure
Facade Enclosure
Openings for Vertical Transportation
Egress Stairs
Station Configuration
Platform Sizing
Length & Width of Platform
1,400’ Platform Extents
800’ Platform Extents
CVS Phase 800’
Phase 1 1,400’
Track clearance
73"
Unobstructed Zone
C L
Track
26' - 9"
Indicative Outline of Canopy
Min. Clearance
above Tracks
Top of Platform
Top of Tracks
4' - 0"
VT zone
21' - 6" 12' - 0"
44" 45"
18' - 0"
ELEVATOR CLEARANCE
45"
13' - 0"
Indicative Viaduct Superstructure
Indicative Station Facade
28' - 6"
Track clearance
73"
Unobstructed Zone
C L
Track
26' - 9"
Min. Clearance
above Tracks
Top of Platform
Top of Tracks
4' - 0"
12' - 0"
20' - 0"
Indicative Viaduct Superstructure
Indicative Outline of Canopy
5' - 0" 20' - 0"
Platform WidthFacade Zone
Indicative Station Facade
Client Project Title
Project No. Date
Scale at Arch E1
Sketch Number
Riverside, 22 Hester Road
London SW11 4AN
www.fosterandpartners.com
T +44(0)20 7738 0455
© Foster + Partners 3/8" = 1'-0"
California High Speed Rail Authority California High Speed Rail Central Valley Stations
09/13/23SK-BAK-AR-044 CVSBakersfield Station
Typical Platform Section
Platform Width: 28’-6”
(28.5’ x 1400’) x 2 Platforms
Platform Area = 79,800sf
The Canopy
Bakersfield - 1901
Bakersfield
Bakersfield - Proposed Area Breakdown
Platforms (55%)
Landside PAX Services (15%)
Trackside Station Operations (4%)
Trackside Platform Access (10%)
MEP (9%)
Landside Train Operations (1%)
Landside Station Operations (3%)
Landside Vendor Spaces (3%)
Total Area = 158,000sf
Site Plan
Bakersfield Station
Parking*
Rental
Cars*
Parking*
Regional Bus Local Bus Depot
0 40’ 80’ 160’
Rental
Cars*
Parking*
Parking*
Rental
Cars*
ADA Parking
Parking*
Rental
Cars
Parking Parking* Parking Parking*
Legend
Drop-off
Pickup
Local Bus Depot
Regional Bus Depot Drop-off
Pickup
Local Bus Depot
Regional Bus Depot Drop-off
Pickup
Local Bus Depot
Regional Bus DepotDrop-off
Pickup
Local Bus Depot
Regional Bus Depot
HSR
Platform ConcoursePlazaPUDOGolden State Avenue
Platform Level + 56’
Canopy Roof +94’
Ceiling Level + 42’
HSR Through
Tracks
Cross Section
Workshop Goals:
Building community partnerships with a focus on mobility, activation and placemaking in and around the future stations. Explore partnership opportunities for projects and grants.
• 235 CBOs reached: warm up calls, emails, outreach
• 97 CBOs attended workshops
• Merced: January 16, 2024 (Virtual)
• 65 CBOs invited, 25 participated
• Kings/T ulare: January 16, 2024 (Virtual)
• 32 CBOs invited, 15 participated
• Bakersfield: January 17 , 2024 (Virtual)
• 73 CBOs invited, 24 participated
• Fresno: January 18, 2024 (In Person)
• 65 CBOs invited, 33 participated
Next Steps: “Thank you” messaging & HSR Updates, Identifying Emerging Themes, Potential Projects, Grants Opoortunities & further outreach follow up.
Community Based Organization (CBO) Workshops
February 2024
March 2024
April 2024
November 2024
Presentation to the Authority Board
Station Refinement Process
Start Schematic Design
Complete Schematic Design