Cities Index.
CCO 025 - BTPP Cable Railing.pdf

Bakersfield City Council
January 22, 2025

Document
CCO 025 - BTPP Cable Railing.pdf
Meeting
January 22, 2025
Body
Bakersfield City Council
Original file
1.8 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

CITY OF BAKERSFIELD
Thomas Roads Improvement Program
SHEET 1 OF 4
CONTRACT NO. P.O. NO.

PROJECT: Bakersfield Freeway Connector Project
FEDERAL NO. (S)
CONTRACTOR: Security Paving Company
ADDRESS: 2915 Fairhaven Drive
Bakersfield, CA 93309

YOU ARE HEREBY DIRECTED TO MAKE THE HEREIN DESCRIBED CHANGES FROM THE PLANS AND SPECIFICATIONS OR DO THE FOLLOWING WORK DESCRIBED NOT INCLUDED IN THE PLANS AND SPECIFICATIONS ON THIS CONTRACT.

NOTE: This change order is not effective until approved by City Council or City Engineer CHANGE SUBMITTED BY: Andres Roldan, Construction Manager, AECOM DATE: 6/1/2020 CHANGE REQUESTED BY: Andres Roldan, Construction Manager, AECOM DATE: 6/1/2020

ACCOUNT NO (S) 122-4021-825-8041 TRCC22 - (144)
126-4021-825-8041 TRCC22 - (245)
151-4021-825-8041 TRCC22 - (245) INCREASE $9,880.00
335-4021-825-8041 TRCC22 - (245) DECREASE $0.00
By reason of this order the time of City Council Approval Required YES X completion will be adjusted as follows: None NO
Approved As to Form: CITY ATTORNEY Approved by the Council of City of Bakersfield Approval Recommended: City Engineer Mayor
Countersigned: Finance Director Date
Contractor: Title:

CONTRACT CHANGE ORDER
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work of contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 18-176 25
PRNSL-5109(245)
CHANGE ORDER NO.

Accepted, Date:

We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above.

EXTRA WORK AT FORCE ACCOUNT:

As directed by the Engineer, in accordance with Section 4-1.05 "Changes and Extra Work" install cable railing blockouts at Pump Plant Disharge Box, as shown on attached drawing
EXTRA WORK AT FORCE ACCOUNT: $4,000.00
INCREASE IN CONTRACT ITEM AT CONTRACT PRICE:

As directed by the Engineer, in accordance with Section 4-1.05 "Changes and Extra Work" add cable railing at Pump Plant Disharge Box Item 185 Cable Railing 56 LF @ $105.00 (+3.26%) = $5,880.00 For the work of this change, the contractor will be paid at extra work at increase in contract item bid item at bid price, inaccordance with Standard Specification Section 9-1.06 and section 9-1.02C Final Pay

UNILATERAL

DEPARTMENT OF TRANSPORTATION

PREPARED FOR THE

STATE OF CALIFORNIA
TIME PLOTTED =>DATE PLOTTED => 10:53:26 AM10/16/2018USERNAME => Togo3

PROJECT ENGINEER

DESIGN OVERSIGHT

SIGN OFF DATE
ST2.dgnFILE =>

DISREGARD PRINTS BEARING

EARLIER REVISION DATES
BRIDGE NO.

SHEET OF

POST MILES

ORIGINAL SCALE IN INCHES

FOR REDUCED PLANS
0 1 2 3
UNIT:

PROJECT NUMBER & PHASE:

DESIGN

DETAILS

QUANTITIES

BY CHECKED

CHECKED

CHECKEDBY
BY

REVISION DATES
CONTRACT NO.:

DIST COUNTY ROUTE SHEET TOTAL

PLANS APPROVAL DATE
NoTOTAL PROJECT SHEETS

POST MILES
DATE

shall not be responsible for the accuracy or
completeness of scanned copies of this plan sheet.

The State of California or its officers or agents

CITY OF BAKERSFIELD
Bakersfield, CA 93301
1600 Truxtun Ave

PARSONS
Irvine, CA 92612
2201 Dupont Drive, Suite 200

1477
J. COLLINSR. SANCHEZ
J. COLLINS
R. SANCHEZ
R. SANCHEZ
J. COLLINS
060000 0484 1
50-0263W
No.

Exp.

R
E
G
I
S
T
E
R
E
D

PROFESSIONAL
E
N
G
I
N
E
E
R

STATE OF CALIFORNIA

JACK COLLINS
DESIGN DETAIL SHEET (ENGLISH) (REV. 04/25/18)

REGISTERED STRUC ENGINEER

1. LOCATE WHERE INDICATED ON THE DRAWINGS.

2. INLET CHANNEL SINGLE BOX.

A. INLET CHANNEL SINGLE BOX.

B. WALLS AND TOP SLAB AT 25' MAX. C-C.

CONSTRUCTION JOINT NOTES:

ROOF PLAN
SCALE: 3/8"=1'-0"
ST-5
B
ST-4
A
VENT
TYP.

ST-10
AD
ST-10
CL
CL
C
ST-10
ST-11
B
20'
8' 2' 16' 2'1'
1'6'

LANDING

4.5'
TYP.

0.5'
18 TREADS @ 11" = 16.5'
1'4'2'9'9'2'
22'
OPNG.
8'
TYP.
2'
TYP.
3'
TYP.
5'
OPNG.
14'
M-7
1 ST-9
1 1 MANHOLE COVER

AND FRAME
CL

DISCHARGE BOX
CL CL

OUTLINE OF LOWER WALL
FOR REINF. &
PUMP COVER PLAN.

ROOF PLAN
SCALE: 3/8"=1'-0"
ST-10
E

7.5'
9'
1'
12'
10'
5'
1'
5'
ST-14
B
9'

1.5'5'2'5.5'

1.5'1'

1.5'1'
1 ST-4
CONC. COLLAR
TIE
1'

HANDRAIL
SCALE: …"=1'-0"
ST-2
CURB
1'

97.85"
CURB
1'
M-4

2.1'

1.8'
MBP3 STRUCTURAL ROOF PLAN

BELLE TERRACE PUMPING PLANT (REPLACE)

4.5' 3'
OPNG.
8'
1'
CURB
1'
CURB
DETAILS & NOTES REFER TO ST-19 TO 21

FOR GENERAL CONCRETE CONSTRUCTION
NOTE:

INLET CHANNEL BELOW
JENSEN PRECAST OR EQUIV.

PRECAST PIPE BELOW PER
90" DIA. REINFORCED CONC

22.3 0-
06 Ker
99 58

22.3/23.9
R52.2/R52.5
685
85 85
06 06-4846 4
07/16/18
7/16/18
7/16/18

RAMON S SANCHEZ
526
17 SANCHEZ, RAMON S.

S 5407
p.
09/30/18
ADDENDUM NO. 3
Imad Abu-Markhieh
7/16/18
B11-47
CABLE

RAILING
RFI 71 (12/11/19)
07/16/18
7/16/18
7/16/18

RAMON S SANCHEZ
529
20 ADDENDUM NO. 3
Imad Abu-Markhieh
7/16/18
CABLE

RAILING
B11-47
RFI 71 (12/11/19)
07/16/18
7/16/18
7/16/18

RAMON S SANCHEZ
535
26 ADDENDUM NO. 3
Imad Abu-Markhieh
7/16/18
B11-47
CABLE

RAILING
RFI 71 (12/11/19)

← All documents from this meeting